1

Power Rate Cases (pbl/rates)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Choices (2003-06) Power Function Review (PFR) Firstgov Power Rate Cases BPA's wholesale power rates are set to recover its costs and repay the U.S. Treasury for the Federal...

2

October 1996 - September 2001 Wholesale Power Rates (rates/previous...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

affecting a specific power purchase. For more specific information see: 1996 Final Wholesale Power and Transmission Rate Schedules: Power Rates (PDF, 84 pages, 188 kb) Ancillary...

3

2007-2009 Power Rate Adjustments (pbl/rates)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Function Review (PFR) Firstgov FY 2007 2009 Power Rate Adjustments BPA's 2007-2009 Wholesale Power Rate Schedules and General Rate Schedule Provisions (GRSPs) took effect on...

4

2007-2009 Power Rates Quarterly Updates (pbl/rates)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PFR) Firstgov FY 2007 2009 Power Rates Quarterly Updates In BPAs 2007-2009 Wholesale Power Rate Case (WP-07), BPA agreed that it would post reports about BPAs power...

5

WP-07 Power Rate Case (rates/ratecases)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rate Cases Financial Choices (2003-06) Power Function Review (PFR) Firstgov 2007 Wholesale Power (WP-07) Rate Case Related Links: Power Function Review (PFR) On July 17, 2006,...

6

BPA Power Rates (pbl/main)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

recover the costs of generating power and associated expenses. Beginning with the 2010 BPA Rate Case, Power Services and Transmission Services plan to conduct rate cases every...

7

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

8

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

9

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

10

October 2001 - September 2006 Wholesale Power Rates (rates/previous...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 2001 - September 2006 The 2002 Wholesale Power Rate Schedules (base rates) for the FY 2002-2006 rate period were originally established in May 2000 during the WP-02 Rate...

11

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

12

Large power grid analysis using domain decomposition  

E-Print Network [OSTI]

Large power grid analysis using domain decomposition Quming Zhou, Kai Sun, Kartik Mohanram, Danny C referred to as the power grid. The power grid for a modern integrated circuit may consist of several grid is traditionally described as a large-scale linear system. Simulation of power grids usually

Mohanram, Kartik

13

October 2003 - March 2004 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 - March 2004 (CRAC 5 period) "Monthly Adjusted" Wholesale Power Rates Effective October 2003 - March 2004 (CRAC 5 period) (PDF, 4 pages, 15 kb, corrected December 18, 2003,...

14

April - September 2004 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 (CRAC 6 period) "Monthly Adjusted" Wholesale Power Rates Effective April 1 - September 30, 2004 (CRAC 6 period) (PDF, 4 pages, 14 kb, originally posted January 12, 2004;...

15

April - September 2005 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April - September 2005 (CRAC 8 period) "Monthly Adjusted" Wholesale Power Rates Effective April - September 2005 (CRAC 8 period) (PDF, 3 pages, 108 kb, posted December 17, 2004)...

16

October 2005 - March 2006 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 2005 - March 2006 (CRAC 9 period) "Monthly Adjusted" Wholesale Power Rates Effective October 2005 - March 2006 (CRAC 9 period) (PDF, 4 pages, 116 kb, originally posted...

17

Power System Operation with Large Penetrations of Wind Power  

Science Journals Connector (OSTI)

The characteristics of wind power result in unique challenges for system operators when integrating large penetrations of wind generation into power systems. This chapter discusses some of the power system ope...

Eleanor Denny

2013-01-01T23:59:59.000Z

18

Definition: Rated power | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Rated power Jump to: navigation, search Dictionary.png Rated power The power output of a device under specific or nominal operating conditions[1] View on Wikipedia Wikipedia Definition In electrical and electronic engineering, the power rating of a device is a guideline set by the manufacturer as a maximum power to be used with that device. This limit is usually set somewhat lower than the level where the device will be damaged, to allow a margin of safety. In devices which primarily dissipate electric power or convert it into mechanical power, such as resistors, electric motors, and speakers, the power rating given is usually the maximum power that can be safely dissipated by the

19

2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.  

SciTech Connect (OSTI)

This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

20

EIS-0102: Bonneville Power Administration's 1983 Wholesale Power Rate  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration prepared this EIS to evaluate the potential environmental impacts associated with an increase in wholesale power rates that would become effective on November 1, 1983, including the effects of rate hikes in that year and the cumulative effects of previous rate hikes.

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

POWER SYSTEMS STABILITY WITH LARGE-SCALE WIND POWER PENETRATION  

E-Print Network [OSTI]

of offshore wind farms, wind power fluctuations may introduce several challenges to reliable power system behaviour due to natural wind fluctuations. The rapid power fluctuations from the large scale wind farms Generation Control (AGC) system which includes large- scale wind farms for long-term stability simulation

Bak-Jensen, Birgitte

22

October 2004 - March 2005 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 - March 2005 (CRAC 7 period) "Monthly Adjusted" Wholesale Power Rates Effective October 2004 - March 2005 (CRAC 7 period) (PDF, 3 pages, 13 kb, originally posted at 11 a.m. on...

23

April - September 2002 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 (CRAC 2 period) "Monthly Adjusted" Wholesale Power Rates Effective April - September 2002 (CRAC 2 period) (PDF, 9 kb, posted April 1, 2002) Note: The PDF document above provides...

24

October 2002 - March 2003 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 - March 2003 (CRAC 3 period) "Monthly Adjusted" Wholesale Power Rates Effective October 2002 - March 2003 (CRAC 3 period) (PDF, 14 kb, posted October 1, 2002) Note: The PDF...

25

April - September 2003 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 (CRAC 4 period) "Monthly Adjusted" Wholesale Power Rates Effective April - September 2003 (CRAC 4 period) (PDF, 3 pages, 74 kb, updated April 8, 2003) Note: The PDF document...

26

October 2001 - March 2002 Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 - March 2002 (CRAC 1 period) "Monthly Adjusted" Wholesale Power Rates Effective October 2001 - March 2002 (CRAC 1 period) (PDF, 6 kb, updated October 3, 2001, posted October 4,...

27

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

28

Laser Power Meter Large, bright, backlit LCD  

E-Print Network [OSTI]

Laser Power Meter FEATURES · Large, bright, backlit LCD display · Digital accuracy with analog-like movement for laser tuning · Works with thermopile and optical sensors · Intuitive button-driven user COMPATIBILITY · PowerMax® thermal sensors · Optical sensors FieldMaxII-TO Coherent Laser Measurement and Control

Woodall, Jerry M.

29

Pump-1-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-A Wholesale Power Rate Schedule Pump-1-A Wholesale Power Rate Schedule Area: Carters & Russell Pumping System: Georgia-Alabama-South Carolina This rate schedule shall be...

30

CTV-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CTV-1-H Wholesale Power Rate Schedule CTV-1-H Wholesale Power Rate Schedule Area: Tennessee Valley Authority System: CU This rate schedule shall be available to the Tennessee...

31

CBR-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers...

32

2007 Wholesale Power Rate Case Initial Proposal : Wholesale Power Rate Development Study.  

SciTech Connect (OSTI)

The Wholesale Power Rate Development Study (WPRDS) calculates BPA proposed rates based on information either developed in the WPRDS or supplied by the other studies that comprise the BPA rate proposal. All of these studies, and accompanying documentation, provide the details of computations and assumptions. In general, information about loads and resources is provided by the Load Resource Study (LRS), WP-07-E-BPA-01, and the LRS Documentation, WP-07-E-BPA-01A. Revenue requirements information, as well as the Planned Net Revenues for Risk (PNNR), is provided in the Revenue Requirement Study, WP-07-E-BPA-02, and its accompanying Revenue Requirement Study Documentation, WP-07-E-BPA-02A and WP-07-E-BPA-02B. The Market Price Forecast Study (MPFS), WP-07-E-BPA-03, and the MPFS Documentation, WP-07-E-BPA-03A, provide the WPRDS with information regarding seasonal and diurnal differentiation of energy rates, as well information regarding monthly market prices for Demand Rates. In addition, this study provides information for the pricing of unbundled power products. The Risk Analysis Study, WP-07-E-BPA-04, and the Risk Analysis Study Documentation, WP-07-E-BPA-04A, provide short-term balancing purchases as well as secondary energy sales and revenue. The Section 7(b)(2) Rate Test Study, WP-07-E-BPA-06, and the Section 7(b)(2) Rate Test Study Documentation, WP-07-E-BPA-06A, implement Section 7(b)(2) of the Northwest Power Act to ensure that BPA preference customers firm power rates applied to their general requirements are no higher than rates calculated using specific assumptions in the Northwest Power Act.

United States. Bonneville Power Administration.

2007-11-01T23:59:59.000Z

33

Sandia National Laboratories: wind turbines produce rated power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

turbines produce rated power Increasing the Scaled Wind Farm Technology Facility's Power Production On April 7, 2014, in Energy, Facilities, News, News & Events, Partnership,...

34

CSI-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy Savers [EERE]

Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be...

35

Provo River Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Provo River Project Power Sales Rate History Updated: 12/20/2013 Rate Schedule Effective Dates Energy (Mills/kWh) Capacity ($/kW-mo.) Combined (Mills/kWh) Administrative Action 4/58 - 6/64 (Summer Season) 3.000 N.A. N.A. Administrative Action 10/58 - 4/64 (Winter Season) 4.500 N.A. N.A. Administrative Action 7/64 - 9/79 (Summer Season) 5.000 N.A. N.A. Administrative Action 10/64 - 9/79 (Winter Season) 3.000 N.A. N.A. Administrative Action 10/79 - 9/82 6.000 N.A. N.A. Administrative Action 10/82 - 9/90 6.850 N.A. N.A. Administrative Action 10/90 - 9/94 8.000 N.A. N.A. Administrative Action 10/94 - Present Installments N.A. N.A. Note: The Provo River Project sells energy only. As of October 1994, customers pay all OM&R expenses and in return, receive all the energy produced by the Project.

36

Variability of Load and Net Load in Case of Large Scale Distributed Wind Power  

SciTech Connect (OSTI)

Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.

Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Gomez-Lazaro, E.; Rawn, B.; Dobschinski, J.; Meibom, P.; Lannoye, E.; Aigner, T.; Wan, Y. H.; Milligan, M.

2011-01-01T23:59:59.000Z

37

Minimizing Variation in Outdoor CPV Power Ratings (Presentation)  

SciTech Connect (OSTI)

Module data from NREL's CPV test bed is used to examine methods for calculating outdoor CPV power ratings. IEC 62670 and ASTM E2527 are used as a starting point for determining a module power rating on a monthly basis. Monthly power ratings vary by more than desired using existing methods. The presentation examines modifications to existing methods as well as spectral corrections to reduce variation in monthly module power ratings.

Muller, M.

2011-02-01T23:59:59.000Z

38

Assessment of Large Combined Heat and Power Market, April 2004...  

Broader source: Energy.gov (indexed) [DOE]

Large Combined Heat and Power Market, April 2004 Assessment of Large Combined Heat and Power Market, April 2004 This 2004 report summarizes an assessment of the 2-50 MW combined...

39

MISS-1-N Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

40

ALA-1-N Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Document Available for Download ALA-1-N Rate Schedule More Documents & Publications MISS-1-N Wholesale Power Rate Schedule

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

WP-96/TR-96 & TC-96 Power and Transmission Rate Case (rates/ratecases...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PFR) Firstgov WP-96TR-96 & TC-96 Power and Transmission Rate Case Index: Final 1996 Wholesale Power and Transmission Rates Proposal (WP-96TR-96) Administrator's Record Of...

42

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

43

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

44

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

45

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

46

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

47

EIS-0093: Bonneville Power Administration's 1982 Rate Proposal  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration prepared this statement to evaluate the potential environmental impacts associated with an increase in wholesale power rates for calendar year 1982, including the effects of rate hikes in that year, the cumulative effects of rate hikes from 1979-1985, as well as alternative revenue scenarios.

48

AP-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

49

AP-3-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

50

AP-1-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.

51

VA-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

52

VA-4-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download VA-4-B Rate Schedule More Documents & Publications

53

AP-4-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download AP-4-B Rate Schedule More Documents & Publications

54

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

55

BPA proposes rate increase to bolster federal power and transmission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA-proposes-rate-increase-to-bolster-federal-power-and-transmission-systems Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects...

56

SOCO-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

57

Duke-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

58

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

59

Santee-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

60

Santee-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Santee-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

62

2007 Wholesale Power Rate Case Initial Proposal : Direct Testimony.  

SciTech Connect (OSTI)

The purpose of our testimony is to sponsor the rate design portions of Bonneville Power Administration's (BPA) Wholesale Power Rate Development Study (WPRDS), WP-07-E-BPA-05, and associated portions of the Wholesale Power Rate Schedules and GRSPs (WP-07-E-BPA-07). Our testimony is organized in eight sections. The first section outlines the purpose of our testimony. Section 2 describes BPA's Demand Rates, including subsections on the definition of the Demand Rate, the method for computing the Demand Rates, and differences from the currently effective WP-02 Demand Rate. Section 3 describes BPA's Load Variance Rate, with subsections on the definition and purpose of the Load Variance Rate, application of the Load Variance Rate, how the Load Variance Rate is calculated, and the differences from the WP-02 Load Variance Rate. Section 4 describes the steps involved in developing BPA's energy rates and differences from the WP-02 rate case. Section 5 discusses discontinuation of the Stepped Up Multi-Year Block Rate. Section 6 describes a minor change to the Unauthorized Increase Rates and the Excess Factoring Rates. Section 7 describes the Targeted Adjustment Charge. Section 8 addresses the Operating Reserves Credit.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

63

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

64

SOCO-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

65

Duke-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer.

66

Duke-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

67

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

68

Santee-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

69

Duke-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

70

SOCO-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

71

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule October 1, 2011 - 3:22pm Addthis Availability: This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three phase

72

Pump-2 Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 Wholesale Power Rate Schedule 2 Wholesale Power Rate Schedule Pump-2 Wholesale Power Rate Schedule Area: Carters & Russell Pumping-Self Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and

73

CTVI-1-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule Area: Former customers of TVA System: Cumberland This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Document Available for Download CTVI-1-A Rate Schedule More Documents & Publications

74

Large-deviation properties of resilience of power grids  

E-Print Network [OSTI]

We study the distributions of the resilience of power flow models against transmission line failures via a so-called backup capacity. We consider three ensembles of random networks and in addition, the topology of the British transmission power grid. The three ensembles are Erd\\H{o}s-R\\'enyi random graphs, Erd\\H{o}s-R\\'enyi random graphs with a fixed number of links, and spatial networks where the nodes are embedded in a two dimensional plane. We investigate numerically the probability density functions (pdfs) down to the tails to gain insight in very resilient and very vulnerable networks. This is achieved via large-deviation techniques which allow us to study very rare values which occur with probability densities below $10^{-160}$. We find that the right tail of the pdfs towards larger backup capacities follows an exponential with a strong curvature. This is confirmed by the rate function which approaches a limiting curve for increasing network sizes. Very resilient networks are basically characterized by ...

Dewenter, Timo

2014-01-01T23:59:59.000Z

75

EIS-0031: Bonneville Power Administration 1979 Wholesale Rate Increase  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) developed this statement to explain the reasons for BPA's proposed power rate schedule, to conduct an analysis of the impacts which the proposal or alternatives thereto could have on both physical and socioeconomic characteristics of the human environment and to identify methods for mitigating the effects of the proposal.

76

Mandatory Green Power Option for Large Municipal Utilities | Department of  

Broader source: Energy.gov (indexed) [DOE]

Green Power Option for Large Municipal Utilities Green Power Option for Large Municipal Utilities Mandatory Green Power Option for Large Municipal Utilities < Back Eligibility Municipal Utility Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State Colorado Program Type Mandatory Utility Green Power Option Provider Colorado Public Utilities Commission Municipal electric utilities serving more than 40,000 customers in Colorado must offer an optional green-power program that allows retail customers the choice of supporting emerging renewable technologies. This policy complements Colorado's renewable portfolio standard (RPS), which requires municipal utilities serving more than 40,000 customers to use renewable energy and energy recycling to account for 10% of retail sales by 2020.

77

Online Monitoring Technical Basis and Analysis Framework for Large Power  

Broader source: Energy.gov (indexed) [DOE]

for Large for Large Power Transformers; Interim Report for FY 2012 Online Monitoring Technical Basis and Analysis Framework for Large Power Transformers; Interim Report for FY 2012 The Light Water Reactor Sustainability Program is a research, development, and deployment program sponsored by the U.S. Department of Energy Office of Nuclear Energy. The program is operated in collaboration with the Electric Power Research Institute's (EPRI's) research and development efforts in the Long-Term Operations (LTO) Program. The LTO Program is managed as a separate technical program operating in the Plant Technology Department of the EPRI Nuclear Power Sector with the guidance of an industry advisory Integration Committee. Because both the Department of Energy Office of Nuclear Energy and EPRI conduct research and development in technologies

78

Large Power Transformers and the U.S. Electric Grid  

Broader source: Energy.gov (indexed) [DOE]

Infrastructure Security and Energy Restoration Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy LARGE POWER TRANSFORMERS AND THE U.S. ELECTRIC GRID Large Power Transformers and the U.S. Electric Grid i This page intentionally left blank. Large Power Transformers and the U.S. Electric Grid DOE / OE / ISER June 2012 ii FOR FURTHER INFORMATION This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific questions about information in this report may be directed to Dr. Kenneth Friedman, Senior Policy Advisor (kenneth.friedman@hq.doe.gov). Tiffany Y. Choi of ICF International contributed to this report.

79

Standby Rates for Combined Heat and Power Systems  

SciTech Connect (OSTI)

Improvements in technology, low natural gas prices, and more flexible and positive attitudes in government and utilities are making distributed generation more viable. With more distributed generation, notably combined heat and power, comes an increase in the importance of standby rates, the cost of services utilities provide when customer generation is not operating or is insufficient to meet full load. This work looks at existing utility standby tariffs in five states. It uses these existing rates and terms to showcase practices that demonstrate a sound application of regulatory principles and ones that do not. The paper also addresses areas for improvement in standby rates.

Sedano, Richard [Regulatory Assistance Partnership; Selecky, James [Brubaker & Associates, Inc.; Iverson, Kathryn [Brubaker & Associates, Inc.; Al-Jabir, Ali [Brubaker & Associates, Inc.

2014-02-01T23:59:59.000Z

80

Coal Transportation Rates to the Electric Power Sector  

Gasoline and Diesel Fuel Update (EIA)

Coal reports Coal reports Coal Transportation Rates to the Electric Power Sector With Data through 2010 | Release Date: November 16, 2012 | Next Release Date: December 2013 | Correction Previous editions Year: 2011 2004 Go Figure 1. Deliveries from major coal basins to electric power plants by rail, 2010 Background In this latest release of Coal Transportation Rates to the Electric Power Sector, the U.S. Energy Information Administration (EIA) significantly expands upon prior versions of this report with the incorporation of new EIA survey data. Figure 1. Percent of total U.S. rail shipments represented in data figure data Previously, EIA relied solely on data from the U.S. Surface Transportation Board (STB), specifically their confidential Carload Waybill Sample. While valuable, due to the statistical nature of the Waybill data,

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect (OSTI)

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

82

2007 Wholesale Power Rate Case Initial Proposal : Risk Analysis Study.  

SciTech Connect (OSTI)

The Federal Columbia River Power System (FCRPS), operated on behalf of the ratepayers of the PNW by BPA and other Federal agencies, faces many uncertainties during the FY 2007-2009 rate period. Among these uncertainties, the largest revolve around hydro conditions, market prices and river operations for fish recovery. In order to provide a high probability of making its U.S. Treasury payments, BPA performs a Risk Analysis as part of its rate-making process. In this Risk Analysis, BPA identifies key risks, models their relationships, and then analyzes their impacts on net revenues (total revenues less expenses). BPA subsequently evaluates in the ToolKit Model the Treasury Payment Probability (TPP) resulting from the rates, risks, and risk mitigation measures described here and in the Wholesale Power Rate Development Study (WPRDS). If the TPP falls short of BPA's standard, additional risk mitigation revenues, such as PNRR and CRAC revenues are incorporated in the modeling in ToolKit until the TPP standard is met. Increased wholesale market price volatility and six years of drought have significantly changed the profile of risk and uncertainty facing BPA and its stakeholders. These present new challenges for BPA in its effort to keep its power rates as low as possible while fully meeting its obligations to the U.S. Treasury. As a result, the risk BPA faces in not receiving the level of secondary revenues that have been credited to power rates before receiving those funds is greater. In addition to market price volatility, BPA also faces uncertainty around the financial impacts of operations for fish programs in FY 2006 and in the FY 2007-2009 rate period. A new Biological Opinion or possible court-ordered change to river operations in FY 2006 through FY 2009 may reduce BPA's net revenues included Initial Proposal. Finally, the FY 2007-2009 risk analysis includes new operational risks as well as a more comprehensive analysis of non-operating risks. Both the operational and non-operational risks will be described in Section 2.0 of this study. Given these risks, if rates are designed using BPA's traditional approach of only adding Planned Net Revenues for Risk (PNRR), power rates would need to recover a much larger ''risk premium'' to meet BPA's TPP standard. As an alternative to high fixed risk premiums, BPA is proposing a risk mitigation package that combines PNRR with a variable rate mechanism similar to the cost recovery adjustment mechanisms used in the FY 2002-2006 rate period. The proposed risk mitigation package is less expensive on a forecasted basis because the rates can be adjusted on an annual basis to respond to uncertain financial outcomes. BPA is also proposing a Dividend Distribution Clause (DDC) to refund reserves in excess of $800M to customers in the event net revenues in the next rate period exceed current financial forecasts.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

83

Sun Also Rises: Planning for Large-Scale Solar Power  

SciTech Connect (OSTI)

Wind, solar, and other renewable energy are an important part of any present-day energy. The portion of energy they supply will certainly be increasing over the next few years. Arguably, large-scale wind power has reached technological maturity, and with more than 100 GW of capacity, ample experience exists on integrating wind systems. Solar technologies, on the other hand, are emerging, and substantial R&D investments are being made to achieve parity with retail electricity costs in the near future. As this happens, annual capacity additions of solar power will become significant.

Bebic, J.; Walling, R.; O'Brien, K.; Kroposki, B.

2009-05-01T23:59:59.000Z

84

Rail Coal Transportation Rates to the Electric Power Sector  

Gasoline and Diesel Fuel Update (EIA)

Analysis & Projections Analysis & Projections ‹ See all Coal Reports Rail Coal Transportation Rates to the Electric Power Sector Release Date: June 16, 2011 | Next Release Date: July 2012 | full report Introduction The U.S. Energy Information Administration (EIA) is releasing a series of estimated data based on the confidential, carload waybill sample obtained from the U.S. Surface Transportation Board (Carload Waybill Sample). These estimated data represent a continuation of EIA's data and analysis products related to coal rail transportation. These estimated data also address a need expressed by EIA's customers for more detailed coal transportation rate data. Having accurate coal rail transportation rate data is important to understanding the price of electricity for two main reasons. First,

85

Idaho Power - Large Commercial Custom Efficiency Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

Large Commercial Custom Efficiency Program Large Commercial Custom Efficiency Program Idaho Power - Large Commercial Custom Efficiency Program < Back Eligibility Agricultural Commercial Industrial Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Appliances & Electronics Commercial Lighting Lighting Maximum Rebate Commercial and Industrial: 70% of project cost Custom Incentive for Existing Irrigation System Replacement: up to 75% of the total project cost Custom Incentive for a New Irrigation System: up to 10% of the total project cost Program Info Funding Source Conservation Program Funding Charge State Idaho Program Type Utility Rebate Program Rebate Amount Commercial and Industrial: $0.12/kWh saved Agricultural Irrigation Efficiency: $0.25/annual kWh saved or $450/kW

86

Colorado River Storage Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Colorado River Storage Project Power Sales Rate History Updated: 10/2/2009 Rate Schedule Effective Dates Energy (Mills/kWh) Capacity ($/kW-mo.) Combined (Mills/kWh) R4-F1 3/62 - 4/74 3.000 $1.275 6.000 UC-F1 4/74 - 6/77 3.000 $1.320 6.110 UC-F2 (Firm Only) 6/77 - 1/81 3.400 $1.340 6.550 UC-FP2 (Peaking Only) 6/77 - 1/81 N.A. $1.340 N.A. SP-F1 (Firm Only) 1/81 - 6/83 4.000 $1.655 7.890 SP-FP1 (Peaking Only) 1/81 - 6/83 N.A. $1.655 N.A. SP-F2 (Firm Only) 6/83 - 9/87 5.000 $2.090 9.920 SP-FP2 (Peaking Only) 6/83 - 9/87 N.A. $2.090 N.A. None 10/87 - Present N.A. N.A. N.A. Note: Beginning October 1, 1987, all Colorado River Storage Project power became a Salt Lake City Area Integrated Projects resource. As of that date, direct sales to power customers ceased.

87

Effect of the shutdown of a large coal fired power plant on ambient mercury species  

E-Print Network [OSTI]

Effect of the shutdown of a coal-fired power plant on urbanof the shutdown of a large coal-fired power plant on ambientof the shutdown of a large coal-fired power plant on ambient

Wang, Yungang

2014-01-01T23:59:59.000Z

88

2007 Wholesale Power Rate Case Initial Proposal : Direct Testimony  

SciTech Connect (OSTI)

The purpose of this testimony is to provide the context and background to the financial and risk policy objectives for BPA's WP-07 Initial Proposal. The testimony contains eight sections. The first is this introduction. Section 2 provides background regarding BPA's Subscription Strategy and the Subscription contracts to which the WP-07 rates will apply. Section 3 describes the financial policy objectives considered when establishing the WP-07 rates. Section 4 describes BPA's risk profile, the risk mitigation tools used in prior rate periods, those proposed here, and additional tools under consideration for the FY 2007-2009 rate period. Section 5 describes financial policy directives and decisions that have shaped the WP-07 Initial Proposal. Section 6 describes the uncertainties of the current litigation regarding the National Marine Fisheries Service (NMFS) Federal Columbia River Power System (FCRPS) Biological Opinion and how it is addressed in this proposal. Section 7 briefly discusses the risk mitigation package in the WP-07 Initial Proposal. Finally, Section 8 describes some liquidity tools that may be incorporated into final studies if circumstances allow.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

89

DEPARTMENT OF ENERGY Western Area Power Administration Provo River Project Rate Order No. WAPA-149  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY Western Area Power Administration Provo River Project Rate Order No. WAPA-149 AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Rate Order Concerning a Power Rate Formula. SUMMARY: The Deputy Secretary of Energy confinned and approved Rate Order No. W AP A-149, placing a power rate fOlIDula for the Provo River Project (PRP) of Western Area Power Administration (Western) into effect on an interim basis. The provisional power rate formula will remain in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) COnfilIDs, approves, and places it into effect on a final basis, or until the power rate formula is replaced by another power rate fOlIDula. DATES: The provisional power rate fonnula will be placed into effect on an interim basis on

90

The impact of large-scale distributed generation on power grid and microgrids  

Science Journals Connector (OSTI)

Abstract With the widespread application of distributed generation (DG), their utilization rate is increasingly higher and higher in the power system. This paper analyzes the static and transient impact of large-scale \\{DGs\\} integrated with the distribution network load models on the power grid. Studies of static voltage stability based on continuous power flow method have shown that a reasonable choice of DG's power grid position will help to improve the stability of the system. The transient simulation results show that these induction motors in the distribution network would make effect on the start-up and fault conditions, which may cause the instability of \\{DGs\\} and grid. The simulation results show that modeling of distributed generations and loads can help in-depth study of the microgrid stability and protection design.

Qian Ai; Xiaohong Wang; Xing He

2014-01-01T23:59:59.000Z

91

Decoherence Rates in Large Scale Quantum Computers and Macroscopic Systems  

E-Print Network [OSTI]

Markovian regime decoherence effects in quantum computers are studied in terms of the fidelity for the situation where the number of qubits N becomes large. A general expression giving the decoherence time scale in terms of Markovian relaxation elements and expectation values of products of system fluctuation operators is obtained, which could also be applied to study decoherence in other macroscopic systems such as Bose condensates and superconductors. A standard circuit model quantum computer involving three-state lambda system ionic qubits is considered, with qubits localised around well-separated positions via trapping potentials. The centre of mass vibrations of the qubits act as a reservoir. Coherent one and two qubit gating processes are controlled by time dependent localised classical electromagnetic fields that address specific qubits, the two qubit gating processes being facilitated by a cavity mode ancilla, which permits state interchange between qubits. With a suitable choice of parameters, it is found that the decoherence time can be made essentially independent of N.

B J Dalton

2005-07-25T23:59:59.000Z

92

Salt Lake City Area Integrated Projects Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Salt Lake City Area Integrated Projects Power Sales Rate History Updated: 9/11/2013 Rate Schedule Effective Dates Energy (Mills/kWh) Capacity ($/kW-mo.) Combined (Mills/kWh) 1/ Composite (Mills/kWh) 2/ SLIP-F1 10/87-9/90 5.000 $2.09 9.92 - SLIP-F2 10/90-11/91 7.250 $3.08 14.5 - SLIP-F3 12/91-9/92 8.100 $3.44 16.2 - SLIP-F4 10/92-9/94 8.400 $3.54 16.72 - SLIP-F5 12/94-4/98 8.900 $3.83 - 20.17 SLIP-F6 4/98-9/02 8.100 $3.44 - 17.57 SLIP-F7 10/02-9/06 9.500 $4.04 - 20.72 SLIP-F8 10/06-9/08 10.430 $4.43 - 25.28 SLIP-F9 (First Step) 10/08-9/09 11.060 $4.70 - 26.80 SLIP-F9 (Second Step) 10/09-Present 12.190 $5.18 - 29.62 The Salt Lake City Area Integrated Projects is a combination of resources from the Collbran, CRSP, and Rio Grande Projects. 1/ Combined rates are calculated with a load factor which is assumed to be constant over a given period. In the SLCA/IP, the load factor is considered to be 58.2 percent.

93

RATES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning & Projects Planning & Projects Power Marketing Rates You are here: SN Home page > Power Marketing > RATES Rates and Repayment Services Rates Current Rates Power Revenue Requirement Worksheet (FY 2014) (Oct 2013 - Sep 2014) (PDF - 30K) PRR Notification Letter (Sep 27, 2013) (PDF - 959K) FY 2012 FP% True-Up Calculations(PDF - 387K) Variable Resource Scheduling Charge FY12-FY16 (October 1, 2012) PRR Forecast FY14-FY17 (May 23, 2013) (PDF - 100K) Forecasted Transmission Rates (May 2013) (PDF - 164K) Past Rates 2013 2012 2011 2010 2009 Historical CVP Transmission Rates (April 2013) (PDF - 287K) Rate Schedules Power - CV-F13 - CPP-2 Transmission - CV-T3 - CV-NWT5 - PACI-T3 - COTP-T3 - CV-TPT7 - CV-UUP1 Ancillary - CV-RFS4 - CV-SPR4 - CV-SUR4 - CV-EID4 - CV-GID1 Federal Register Notices - CVP, COTP and PACI

94

RATES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Marketing > RATES Marketing > RATES RATES Current Rates Past Rates 2006 2007 2008 2009 2010 2011 2012 Rates Schedules Power CV-F13 CPP-2 Transmissions CV-T3 CV-NWT5 PACI-T3 COTP-T3 CV-TPT7 CV-UUP1 Ancillary CV-RFS4 CV-SPR4 CV-SUR4 CV-EID4 CV-GID1 Future and Other Rates SNR Variable Resource Scheduling Charge FY12-FY16 (October 1, 2012) SNR Rates Process Calendar (PDF - 171K) Procedures Informal Process Transmission Action Items List (PDF - 144K) Power Action Item List updated on 4-27-10 (PDF - 155K) Power Action Item List (Quick links to relevant documents) Formal Process Rates Brochure (01/11/2011) (PDF - 900K) Appendix A - Federal Register Notice (01/03/2011) (PDF - 8000K) Appendix B - Central Valley Project Power Repayment Study (PDF - 22,322K) Appendix C - Development of the CVP Cost of Service Study (PDF - 2038K)

95

RATES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RATES RATES Rates Document Library SNR Rates Process Calendar (PDF - 171K) Procedures Informal Process Transmission Action Items List (PDF - 144K) Power Action Item List updated on 4-27-10 (PDF - 155K) Power Action Item List (Quick links to relevant documents) Formal Process Rates Brochure (01/11/2011) (PDF - 900K) Appendix A - Federal Register Notice (01/03/2011) (PDF - 8000K) Appendix B - Central Valley Project Power Repayment Study (PDF - 22,322K) Appendix C - Development of the CVP Cost of Service Study (PDF - 2038K) Appendix D - Western Transmission System Facilities Map (PDF - 274K) Appendix E - Estimated FY12 FP and BR Customer (PDF - 1144K) Appendix F - Forecasted Replacements and Additions FY11 - FY16 (PDF - 491K) Appendix G - Definitions (PDF - 1758K) Appendix H - Acronyms (PDF - 720K)

96

Multiobjective Optimization of Renewable Energy Penetration Rate in Power Systems  

Science Journals Connector (OSTI)

Abstract Nowadays, multi-source systems based on renewable energy technologies become the key to a sustainable energy supply infrastructure against the rising cost and the pollutant nature of fossil primary energy used in conventional power plant. However, the cost of renewable energy technologies and the reliability of a multi-sources generation system are generally conflicting with each other. This paper presents a multiobjective formulation to allow optimizing simultaneously both the annualized renewable energy cost the system reliability defined as the renewable energy - load disparity (RELD). This later takes into account the lack of energy as well as the exceed weighted by a penalty factor. The optimization is reach by acting on the penetration rate of each type of renewable generation technologies in order to satisfy a certain load curve. In order to solve this problem, this work suggests to use the fast and elitist multiobjective genetic algorithm: NSGA-II. A case study shows that the use of diversified resources allows to handle the RELD and to decrease the exceed renewable energy (RERE) and load energy notsupplied (LENS).

Hasnae Bilil; Ghassane Aniba; Mohamed Maaroufi

2014-01-01T23:59:59.000Z

97

PowerChoice Residential Customer Response to TOU Rates  

E-Print Network [OSTI]

Load Data .and Swing rate season load- data analysis Tariff Periodperiods used for the Summer and Swing rate season load-data

Peters, Jane S.

2010-01-01T23:59:59.000Z

98

Environmental Impacts From the Installation and Operation of Large-scale Solar Power Plants  

SciTech Connect (OSTI)

Large-scale solar power plants are being developed at a rapid rate, and are setting up to use thousands or millions of acres of land globally. The environmental issues related to the installation and operation phases of such facilities have not, so far, been addressed comprehensively in the literature. Here we identify and appraise 32 impacts from these phases, under the themes of land use intensity, human health and well-being, plant and animal life, geohydrological resources, and climate change. Our appraisals assume that electricity generated by new solar power facilities will displace electricity from traditional U.S. generation technologies. Altogether we find 22 of the considered 32 impacts to be beneficial. Of the remaining 10 impacts, 4 are neutral, and 6 require further research before they can be appraised. None of the impacts are negative relative to traditional power generation. We rank the impacts in terms of priority, and find all the high-priority impacts to be beneficial. In quantitative terms, large-scale solar power plants occupy the same or less land per kW h than coal power plant life cycles. Removal of forests to make space for solar power causes CO{sub 2} emissions as high as 36 g CO{sub 2} kW h{sup -1}, which is a significant contribution to the life cycle CO{sub 2} emissions of solar power, but is still low compared to CO{sub 2} emissions from coal-based electricity that are about 1100 g CO{sub 2} kW h{sup -1}.

Fthenakis, V.; Turney, Damon

2011-04-23T23:59:59.000Z

99

CP&L-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule CP&L-2-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download CP&L-2-B Rate Schedule

100

CP&L-1-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule CP&L-1-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download CP&L-1-B Rate Schedule

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Measurements of Film Flow Rate in Heated Tubes with Various Axial Power Distributions  

E-Print Network [OSTI]

Measurements of Film Flow Rate in Heated Tubes with Various Axial Power Distributions by Carl, Measurements of Film Flow Rate in Heated Tubes with Various Axial Power Distributions KTH Nuclear Reactor power is limited by a phenomenon called critical heat flux (CHF). It appears as a sudden detoriation

Haviland, David

102

Market power, fuel substitution and infrastructure A large-scale equilibrium model of global energy markets  

Science Journals Connector (OSTI)

Abstract Assessing and quantifying the impacts of technological, economic, and policy shifts in the global energy system requirelarge-scale numerical models. We propose a dynamic multi-fuel market equilibrium model that combines endogenous fuel substitution within demand sectors and in power generation, detailed infrastructure capacity constraints and investment, as well as strategic behaviour and market power aspects by suppliers in a unified framework. This model is the first of its kind in which market power is exerted across several fuels. Using a data set based on the IEA (International Energy Agency) World Energy Outlook 2013 (New Policies scenario, time horizon 20102050, 30 regions, 10 fuels), we illustrate the functionality of the model in two scenarios: a reduction of shale gas availability in the US relative to current projections leads to an even stronger increase of power generation from natural gas in the European Union relative to the base case; this is due to a shift in global fossil fuel trade. In the second scenario, a tightening of the EU ETS emission cap by 80% in 2050 combined with a stronger biofuel mandate spawns a renaissance of nuclear power after 2030 and a strong electrification of the transportation sector. We observe carbon leakage rates from the unilateral mitigation effort of 6070%.

Daniel Huppmann; Ruud Egging

2014-01-01T23:59:59.000Z

103

CP&L-3-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule CP&L-3-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

104

Alaska - AS 42.05.431 - Power of Commission to Fix Rates | Open...  

Open Energy Info (EERE)

- Power of Commission to Fix Rates Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Alaska - AS 42.05.431 - Power of Commission...

105

IMPROVING THE ROBUSTNESS OF FUZZY LOGIC ATM ABR RATE CONTROL FOR LARGE ROUND TRIP TIMES  

E-Print Network [OSTI]

IMPROVING THE ROBUSTNESS OF FUZZY LOGIC ATM ABR RATE CONTROL FOR LARGE ROUND TRIP TIMES Lachlan L in the presence of a large round trip time (RTT). A simple fuzzy logic controller was recently shown to perform. In recent years, fuzzy logic [4,5] has shown promise in the control of complex systems, and several fuzzy

Andrew, Lachlan

106

HEADLINE: BPA RAISES RATES TO BOLSTER FEDERAL POWER AND TRANSMISSION...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 13 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, July 24, 2013 CONTACT: Teresa Waugh, 503-230-7536 Doug Johnson, 503-230-5840 or 503-230-5131 BPA adopts new...

107

Energy Management Using Storage Batteries in Large Commercial Facilities Based on Projection of Power Demand  

Science Journals Connector (OSTI)

This study provides three methods for projection of power demand of large commercial facilities planned for construction, ... the operation algorithm of storage batteries to manage energy and minimize power costs...

Kentaro Kaji; Jing Zhang; Kenji Tanaka

2013-01-01T23:59:59.000Z

108

Model Abstraction Techniques for Large-Scale Power Systems  

E-Print Network [OSTI]

Report on System Simulation using High Performance Computing Prepared by New Mexico Tech New Mexico: Application of High Performance Computing to Electric Power System Modeling, Simulation and Analysis Task Two

109

Large Power Transformers and the U.S. Electric Grid Report Update (April 2014)  

Broader source: Energy.gov [DOE]

The Office of Electricity Delivery and Energy Reliability has released an update to its 2012 Large Power Transformers and the U.S. Electric Grid report.

110

Optimization and control of a large-scale solar chimney power plant.  

E-Print Network [OSTI]

??ENGLISH ABSTRACT: The dissertation builds on previous research (Pretorius, 2004) and investigates the optimization and control of a large-scale solar chimney power plant. Performance results (more)

Pretorius, Johannes Petrus

2007-01-01T23:59:59.000Z

111

Update to Large Power Transformers and the U.S. Electric Grid Report Now Available  

Broader source: Energy.gov [DOE]

The Office of Electricity Delivery and Energy Reliability has released an update to its 2012 Large Power Transformers and the U.S. Electric Grid report.

112

SCE&G-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SCE&G-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

113

SCE&G-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SCE&G-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

114

High-Power Negative Ion Sources for Neutral Beam Injectors in Large Helical Device  

SciTech Connect (OSTI)

Large-scaled hydrogen negative-ion sources, in which cesium is introduced in the source plasma, have been developed for neutral beam injectors in Large Helical Device, and their operational characteristics are reviewed. For high-efficient negative ion production, configuration of the magnetic filter field and the cusp magnetic field was optimized, resulting in a high arc efficiency for the negative ion production of 0.23A/kW. With use of a multi-slotted grounded grid, the gas pressure in the acceleration gap is lowered, leading to reduction of the heat load of the grounded grid. As a result, the voltage holding ability is much improved, and the rated energy of 180 keV is achieved in a short conditioning period of 4 days. The injection power is increased linearly to the 5/2 power of the beam energy and reached 5.7MW with an energy of 184keV, which exceeds the specified value of 180keV-5MW. Beam uniformity has been improved with an individual control of the local arc discharge by adjusting 12-divided output voltages of the arc and filament power supplies. The injection duration has been extended to 120sec with a reduced power. Spectroscopic measurement has been carried out for the source plasma. The cesium-ion line is observed in the plasma volume, and, however, the negative ion production is not influenced by the cesium ions in the plasma because the negative ions should be produced on the cesium-covered plasma grid surface.

Takeiri, Y.; Kaneko, O.; Tsumori, K.; Ikeda, K.; Nagaoka, K.; Osakabe, M.; Oka, Y.; Asano, E.; Kondo, T.; Sato, M.; Shibuya, M.; Komada, S. [National Institute for Fusion Science, Toki 509-5292 (Japan); Fantz, U. [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, Garching (Germany)

2007-08-10T23:59:59.000Z

115

On the problem of reliable stabilization for large power systems  

E-Print Network [OSTI]

, the electric power systems such as the Eastern/Western North American grids and European grid have experienced, and moreover pushed the networks to their operational limits. Besides, the integration of land-based/offshore dynamics as well as on the load flow of the system. On the other hand, the transmission grids have seen

Antsaklis, Panos

116

SCE&G-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SCE&G-1-E Wholesale Power Rate Schedule Area: South Carolina Electric & Gas Area System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

117

Exploiting Schedule Slacks for RateOptimal PowerMinimum Software Pipelining #  

E-Print Network [OSTI]

­engineered compiler on Wattch power simulator, we observe that our approach can reduce dynamic energy consumptionExploiting Schedule Slacks for Rate­Optimal Power­Minimum Software Pipelining # Hongbo Yang + R systems de­ mand new compiler techniques geared toward both high performance and low power. Software

Gao, Guang R.

118

SCE&G-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SCE&G-4-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina served through the transmission facilities of South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

119

Western Area Power Administration, Desert Southwest Region Facilities Ratings Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Ratings Project Facilities Ratings Project Hoover-Mead #1 and #5 230-kV and Mead-Marketplace 500-kV Transmission Lines Continuation Sheet Project Description (Continued) Hoover-Mead # 1 230-kV Transmission Line Along the Hoover-Mead #1 230-kV transmission line, the existing line will be reconductored between structures 0/4 and 4/2, about 3.5 linear miles. Structure 0/4 is located northeast of Mead Substation; structure 4/2 is located southeast of Boulder City Tap. The scope of work for the reconductoring includes the following: * At tangent structures (where there is no change in the angle of the transmission line), pulleys or travelers will be installed where the existing conductor attaches to the insulator. The old conductor will be pulled out through the travelers and new wire will be pulled in. A bucket truck

120

Lessons Learned: Planning and Operating Power Systems with Large  

E-Print Network [OSTI]

flow) run-of-river hydro plant. While there are plans for large size photovoltaic (PV) installations on both islands, small residential roof-mounted PV systems have already proliferated, and an almost exponential growth of these small systems is forecasted. Figure 1 Small Net Metered PV Systems Installed

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Performance of Fuzzy Logic ABR Rate Control with Large Round Trip Times  

E-Print Network [OSTI]

Performance of Fuzzy Logic ABR Rate Control with Large Round Trip Times KUAN Su-Hsien and Lachlan L hip times (R`ITs), which can cause instability in control algorithms. A brief review of fuzzy logic of B recently pm- posed funy logic controller for ABR with a simple thresholdbased scheme in this case

Andrew, Lachlan

122

Provisioning of dynamic traffic in mixed-line-rate optical networks with launch power determination  

Science Journals Connector (OSTI)

In mixed-line-rate (MLR) networks, different line rates on different wavelengths can coexist on the same fiber. MLR architectures can be built over transparent optical networks, where the transmitted signals remain in the optical domain along the entire ... Keywords: Dynamic lightpath provisioning, Impairment-aware provisioning, Launch power determination, Mixed-line-rate optical WDM networks

Haydar Cukurtepe, Massimo Tornatore, Aysegul Yayimli, Biswanath Mukherjee

2014-06-01T23:59:59.000Z

123

Rate of cooling and power consumption of farm milk coolers  

E-Print Network [OSTI]

milk usinm asit tcr1;. a'. er :;th wit::- out ice bank - mnruier load, i, ". . . rch 20, 196'd. '1'he ac:blent tem; er ature was ~O al ~ 6 & ~ 4 ~ 0 ~ i ~ 0 ~ ~ 0 ~ * ~ ~ ~ I V Typical data sheet for rate of cooling miiir using' crit... VIE Discussion of Resolta , , ~ . ~ . . . 51 VII. Corclusions ~ ~ ~ 55 VIII. sitsrsture Citsrl 55 Page X Typical data sheet for rats of cooling milk usinw agitated water bath with ice bank morning load~ Iarch 80, 195Ri The ambient temperature...

McCardle, Arthur, Jr

2012-06-07T23:59:59.000Z

124

Large-pitch fibers: Pushing very large mode areas to highest powers  

Science Journals Connector (OSTI)

A scalable fiber design for ytterbium-doped high performance fiber lasers and amplifiers will be presented. The working principle of large-pitch fibers (LPF) bases on delocalization of...

Limpert, Jens

125

Enhanced IGCC regulatory control and coordinated plant-wide control strategies for improving power ramp rates  

SciTech Connect (OSTI)

As part of ongoing R&D activities at the National Energy Technology Laboratorys (NETL) Advanced Virtual Energy Simulation Training & Research (AVESTAR) Center, this paper highlights strategies for enhancing low-level regulatory control and system-wide coordinated control strategies implemented in a high-fidelity dynamic simulator for an Integrated Gasification Combined Cycle (IGCC) power plant with carbon capture. The underlying IGCC plant dynamic model contains 20 major process areas, each of which is tightly integrated with the rest of the power plant, making individual functionally-independent processes prone to routine disturbances. Single-loop feedback control although adequate to meet the primary control objective for most processes, does not take into account in advance the effect of these disturbances, making the entire power plant undergo large offshoots and/or oscillations before the feedback action has an opportunity to impact control performance. In this paper, controller enhancements ranging from retuning feedback control loops, multiplicative feed-forward control and other control techniques such as split-range control, feedback trim and dynamic compensation, applicable on various subsections of the integrated IGCC plant, have been highlighted and improvements in control responses have been given. Compared to using classical feedback-based control structure, the enhanced IGCC regulatory control architecture reduces plant settling time and peak offshoots, achieves faster disturbance rejection, and promotes higher power ramp-rates. In addition, improvements in IGCC coordinated plant-wide control strategies for Gasifier-Lead, GT-Lead and Plantwide operation modes have been proposed and their responses compared. The paper is concluded with a brief discussion on the potential IGCC controller improvements resulting from using advanced process control, including model predictive control (MPC), as a supervisory control layer.

Mahapatra, P.; Zitney, S.

2012-01-01T23:59:59.000Z

126

Factors Affecting the Rate of Penetration of Large-Scale Electricity Technologies: The Case of Carbon Sequestration  

SciTech Connect (OSTI)

This project falls under the Technology Innovation and Diffusion topic of the Integrated Assessment of Climate Change Research Program. The objective was to better understand the critical variables that affect the rate of penetration of large-scale electricity technologies in order to improve their representation in integrated assessment models. We conducted this research in six integrated tasks. In our first two tasks, we identified potential factors that affect penetration rates through discussions with modeling groups and through case studies of historical precedent. In the next three tasks, we investigated in detail three potential sets of critical factors: industrial conditions, resource conditions, and regulatory/environmental considerations. Research to assess the significance and relative importance of these factors involved the development of a microeconomic, system dynamics model of the US electric power sector. Finally, we implemented the penetration rate models in an integrated assessment model. While the focus of this effort is on carbon capture and sequestration technologies, much of the work will be applicable to other large-scale energy conversion technologies.

James R. McFarland; Howard J. Herzog

2007-05-14T23:59:59.000Z

127

Temporal structure of aggregate power fluctuations in large-eddy simulations of extended wind-farms  

E-Print Network [OSTI]

Fluctuations represent a major challenge for the incorporation of electric power from large wind-farms into power grids. Wind farm power output fluctuates strongly in time, over various time scales. Understanding these fluctuations, especially their spatio-temporal characteristics, is particularly important for the design of backup power systems that must be readily available in conjunction with wind-farms. In this work we analyze the power fluctuations associated with the wind-input variability at scales between minutes to several hours, using large eddy simulations (LES) of extended wind-parks, interacting with the atmospheric boundary layer. LES studies enable careful control of parameters and availability of wind-velocities simultaneously across the entire wind-farm. The present study focuses on neutral atmospheric conditions and flat terrain, using actuator-disk representations of the individual wind-turbines. We consider power from various aggregates of wind-turbines such as the total average power sign...

Stevens, Richard J A M

2014-01-01T23:59:59.000Z

128

Large-scale Wind Power integration in a Hydro-Thermal Power Market.  

E-Print Network [OSTI]

?? This master thesis describes a quadratic programming model used to calculate the spot prices in an efficient multi-area power market. The model has been (more)

Trtscher, Thomas

2007-01-01T23:59:59.000Z

129

2007 Wholesale Power Rate Adjustment Proceeding (WP-07) : Administrator's Final Record of Decision.  

SciTech Connect (OSTI)

This Record of Decision (ROD) contains the decisions of the Bonneville Power Administration (BPA), based on the record compiled in this rate proceeding, with respect to the adoption of power rates for the three-year rate period commencing October 1, 2006, through September 30, 2009. This ''2007 Wholesale Power Rate Adjustment Proceeding'' is designed to establish replacement rate schedules and General Rate Schedule Provisions (GRSPs) for those that expire on September 30, 2006. This power rate case also establishes the General Transfer Agreement (GTA) Delivery Charge for the period of October 1, 2007, through September 30, 2009. BPA's Power Subscription Strategy and Record of Decision (Subscription Strategy), as well as other Agency processes, provide much of the policy context for this rate case and are described in Section 2. This ROD follows a full evidentiary hearing and briefing, including an Oral Argument before the BPA Administrator. Sections 3 through 18, including any appendices or attachments, present the issues raised by parties in this proceeding, the parties positions, BPA staff positions on the issues, BPA's evaluations of the positions, and the Administrator's decisions. Parties had the opportunity to file briefs on exceptions to the Draft ROD, before issuance of this Final Record of Decision.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

130

Generation of high power, high repetition-rate pulses using erbium-doped fiber ring laser  

E-Print Network [OSTI]

This thesis presents the results obtained from crographics. generation of high repetition rate, high peak power output pulses using an erbium-doped fiber amplifier (EDFA). Two configurations were employed. The first setup used a linear cavity...

Hinson, Brett Darren

2012-06-07T23:59:59.000Z

131

System Design Considerations for High data Rate Communications Over Multi-wire Overhead Power-  

E-Print Network [OSTI]

System Design Considerations for High data Rate Communications Over Multi-wire Overhead Power communications, multi-wire overhead lines, capacity, OFDM, coding. I. INTRODUCTION The increasing interest, and severe narrowband interference [1]. The channel characteristics of medium voltage overhead power-line

Kavehrad, Mohsen

132

Mode I fracture of a biopolymer gel: rate-dependent dissipation and large deformations disentangled  

E-Print Network [OSTI]

We have designed a new experimental setup able to investigate fracture of soft materials at small scales. At high crack velocity, where energy is mostly dissipated through viscoelastic processes, we observe an increasingly large high strain domain in the crack tip vicinity. Taking advantage of our ability to determine where linear elasticity breaks down, we derive a simple prediction for the evolution of the energy release rate with the crack velocity.

Maxime Lefranc; Elisabeth Bouchaud

2015-01-06T23:59:59.000Z

133

Asymptotically Optimal Transmission Policies for Large-Scale Low-Power Wireless Sensor Networks  

E-Print Network [OSTI]

Asymptotically Optimal Transmission Policies for Large-Scale Low-Power Wireless Sensor Networks. The objective is to devise joint routing, power control and transmission scheduling policies in order to gather formulate the problem as maximizing the utility of transmissions subject to explicit fairness constraints

Starobinski, David

134

WIRELESS HELIOSTAT AND CONTROL SYSTEM FOR LARGE SELF-POWERED HELIOSTAT FIELDS  

E-Print Network [OSTI]

WIRELESS HELIOSTAT AND CONTROL SYSTEM FOR LARGE SELF-POWERED HELIOSTAT FIELDS Dr. Stephan Kubisch 1 of a wireless mesh network as control technology in a field of self-powered heliostats, thus eliminating heliostats field to be build in the future: About 100 small communication devices, so called Helio

Turau, Volker

135

Total Cost Per MwH for all common large scale power generation sources |  

Open Energy Info (EERE)

Total Cost Per MwH for all common large scale power generation sources Total Cost Per MwH for all common large scale power generation sources Home > Groups > DOE Wind Vision Community In the US DOEnergy, are there calcuations for real cost of energy considering the negative, socialized costs of all commercial large scale power generation soruces ? I am talking about the cost of mountain top removal for coal mined that way, the trip to the power plant, the sludge pond or ash heap, the cost of the gas out of the stack, toxificaiton of the lakes and streams, plant decommision costs. For nuclear yiou are talking about managing the waste in perpetuity. The plant decomission costs and so on. What I am tring to get at is the 'real cost' per MWh or KWh for the various sources ? I suspect that the costs commonly quoted for fossil fuels and nucelar are

136

The Use of Large Transparent Ceramics in a High Powered, Diode Pumped Solid State Laser  

SciTech Connect (OSTI)

The advent of large transparent ceramics is one of the key enabling technological advances that have shown that the development of very high average power compact solid state lasers is achievable. Large ceramic neodymium doped yttrium aluminum garnet (Nd:YAG) amplifier slabs are used in Lawrence Livermore National Laboratory's (LLNL) Solid State Heat Capacity Laser (SSHCL), which has achieved world record average output powers in excess of 67 kilowatts. We will describe the attributes of using large transparent ceramics, our present system architecture and corresponding performance; as well as describe our near term future plans.

Yamamoto, R; Bhachu, B; Cutter, K; Fochs, S; Letts, S; Parks, C; Rotter, M; Soules, T

2007-09-24T23:59:59.000Z

137

Improving Switching Performance of Power MOSFETs Used in High Rep-Rate, Short Pulse, High-Power Pulsers  

SciTech Connect (OSTI)

As their switching and power handling characteristics improve, solid-state devices are finding new applications in pulsed power. This is particularly true of applications that require fast trains of short duration pulses. High voltage (600-1200V) MOSFETs are especially well suited for use in these systems, as they can switch at significant peak power levels and are easily gated on and off very quickly. MOSFET operation at the shortest pulse durations is not constrained by the intrinsic capabilities of the MOSFET, but rather by the capabilities of the gate drive circuit and the system physical layout. This project sought to improve MOSFET operation in a pulsed power context by addressing these issues. The primary goal of this project is to improve the switching performance of power MOSFETs for use in high rep-rate, short pulse, high-power applications by improving the design of the gate drive circuits and the circuit layouts used in these systems. This requires evaluation of new commercial gate drive circuits and upgrading the designs of LLNL-developed circuits. In addition, these circuits must be tested with the fastest available high-voltage power MOSFETs.

Cook, E G

2006-09-19T23:59:59.000Z

138

Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives  

SciTech Connect (OSTI)

This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

Allison, T.; Griffes, P.; Edwards, B.K.

1995-03-01T23:59:59.000Z

139

Non-Stationary Random Process for Large-Scale Failure and Recovery of Power Distributions  

E-Print Network [OSTI]

A key objective of the smart grid is to improve reliability of utility services to end users. This requires strengthening resilience of distribution networks that lie at the edge of the grid. However, distribution networks are exposed to external disturbances such as hurricanes and snow storms where electricity service to customers is disrupted repeatedly. External disturbances cause large-scale power failures that are neither well-understood, nor formulated rigorously, nor studied systematically. This work studies resilience of power distribution networks to large-scale disturbances in three aspects. First, a non-stationary random process is derived to characterize an entire life cycle of large-scale failure and recovery. Second, resilience is defined based on the non-stationary random process. Close form analytical expressions are derived under specific large-scale failure scenarios. Third, the non-stationary model and the resilience metric are applied to a real life example of large-scale disruptions due t...

Wei, Yun; Galvan, Floyd; Couvillon, Stephen; Orellana, George; Momoh, James

2012-01-01T23:59:59.000Z

140

Decommissioning of Large Components as an Example of Steam Generator from PWR Nuclear Power Plants  

SciTech Connect (OSTI)

This paper describes the procedure for the qualification of large components (Steam Generators) as an IP-2 package, the ship transport abroad to Sweden and the external treatment of this components to disburden the Nuclear Power Plant from this task, to assure an accelerated the deconstruction phase and to minimize the amount of waste. In conclusion: The transport of large components to an external treatment facility is linked with many advantages for a Nuclear Power Plant: - Disburden of the Nuclear Power Plant from the treatment of such components, - no timely influence on the deconstruction phase of the power reactor and therewith an accelerated deconstruction phase and - minimization of the waste to be returned and therewith less demand of required waste storage capacity. (authors)

Beverungen, M. [GNS Gesellschaft fur Nuklear-Service mbH, Hollestrabe 7A (Germany)

2008-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Initiating Event Rates at U.S. Nuclear Power Plants 19882013  

SciTech Connect (OSTI)

Analyzing initiating event rates is important because it indicates performance among plants and also provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants since each plants low-power license date. The evaluation is based on the operating experience from fiscal year 1988 through 2013 as reported in licensee event reports. Engineers with nuclear power plant experience staff reviewed each event report since the last update to this report for the presence of valid scrams or reactor trips at power. To be included in the study, an event had to meet all of the following criteria: includes an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), sequence of events starts when reactor is critical and at or above the point of adding heat, occurs at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and is reported by a licensee event report. This report displays occurrence rates (baseline frequencies) for the categories of initiating events that contribute to the NRCs Industry Trends Program. Sixteen initiating event groupings are trended and displayed. Initiators are plotted separately for initiating events with different occurrence rates for boiling water reactors and pressurized water reactors. p-values are given for the possible presence of a trend over the most recent 10 years.

John A. Schroeder; Gordon R. Bower

2014-02-01T23:59:59.000Z

142

Dynamic Rate and Power Allocation in Wireless Ad Hoc Networks with Elastic and Inelastic Traffic  

Science Journals Connector (OSTI)

In this paper, we focus on the problem of dynamic rate and power allocation in wireless ad hoc networks with slow-fading channels, where a mixture of elastic and inelastic traffic is supported. A stochastic optimization problem incorporating the quality ... Keywords: Dynamic resource allocation, Elastic flows, Inelastic flows, Particle swarm optimization (PSO), QoS requirements, Stochastic duality theory

Fei Wang; Xiaofeng Liao; Songtao Guo; Hongyu Huang; Tingwen Huang

2013-05-01T23:59:59.000Z

143

Inflation that runs naturally: Gravitational waves and suppression of power at large and small scales  

E-Print Network [OSTI]

We point out three correlated predictions of the axion monodromy inflation model: large amplitude of gravitational waves, suppression of power on horizon scales and on scales relevant for the formation of dwarf galaxies. While these predictions are likely generic to models with oscillations in the inflaton potential, the axion monodromy model naturally accommodates the required running spectral index through Planck-scale corrections to the inflaton potential. Applying this model to a combined data set of Planck, ACT, SPT, and WMAP low-$\\ell$ polarization cosmic microwave background (CMB) data, we find a best-fit tensor-to-scalar ratio $r_{0.05} = 0.07^{+0.05}_{-0.04}$ due to gravitational waves, which may have been observed by the BICEP2 experiment. Despite the contribution of gravitational waves, the total power on large scales (CMB power spectrum at low multipoles) is lower than the standard $\\Lambda$CDM cosmology with a power-law spectrum of initial perturbations and no gravitational waves, thus mitigating some of the tension on large scales. There is also a reduction in the matter power spectrum of 20-30\\% at scales corresponding to $k = 10~{\\rm Mpc}^{-1}$, which are relevant for dwarf galaxy formation. This will alleviate some of the unsolved small-scale structure problems in the standard $\\Lambda$CDM cosmology.

Quinn E. Minor; Manoj Kaplinghat

2014-11-03T23:59:59.000Z

144

Energy-Efficient Antenna Selection and Power Allocation for Large-Scale Multiple Antenna  

E-Print Network [OSTI]

the BS to harvest energy from renewable energy sources such as solar, wind, and so on, can effectivelyEnergy-Efficient Antenna Selection and Power Allocation for Large-Scale Multiple Antenna Systems with Hybrid Energy Supply Zhenyu Zhou1 , Sheng Zhou2 , Jie Gong2 , and Zhisheng Niu2 1 State Key Laboratory

145

Stability of large DC power systems using switching converters, with application to the International Space Station  

SciTech Connect (OSTI)

As space direct current (dc) power systems continue to grow in size, switching power converters are playing an ever larger role in power conditioning and control. When designing a large dc system using power converters are playing an ever larger role in power conditioning and control.When designing a large dc system using power converters of this type, special attention must be placed on the electrical stability of the system and of the individual loads on the system. In the design of the electric power system (EPS) of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) and its contractor team led by Boeing Defense and Space Group has placed a great deal of emphasis on designing for system and load stability. To achieve this goal, the team has expended considerable effort deriving a clear concept on defining system stability in both a general sense and specifically with respect to the space station. The ISS power system presents numerous challenges with respect to system stability, such as high power, complex sources and undefined loads. As a result, the program has derived an impedance specification approach for system stability. This approach is based on the significant relationship between source and load impedances and the effect of this relationship on system stability. This approach is limited in its applicability by the theoretical and practical limits on component designs as presented by each system segment. As a result, the overall approach to system stability implemented by the ISS program consists of specific hardware requirements coupled with extensive system analysis and hardware testing.

Gholdston, E.W. [Rockwell International, Canoga Park, CA (United States). Rocketdyne Div.; Karimi, K. [Boeing Co., Seattle, WA (United States); Lee, F.C.; Rajagopalan, J.; Panov, Y. [Virginia Polytechnic Inst. and State Univ., Blacksburg, VA (United States); Manners, B. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center

1996-12-31T23:59:59.000Z

146

Abstract--A large share of integrated wind power causes technical and financial impacts on the operation of the existing  

E-Print Network [OSTI]

the future wind power feed-in. But in an efficient market setting, power plant operators will take1 Abstract-- A large share of integrated wind power causes technical and financial impacts behaviour of the wind power generation and of the prediction error. It can be used for the evaluation

147

Multi-nozzle array spray cooling for large area high power devices in a closed loop system  

Science Journals Connector (OSTI)

Abstract A prototype of a closed loop system was built to study multi-nozzle array spray cooling on high-power, large-area electronic devices. Fifty-four nozzles with an in-lined array of 9 6 were applied to spray cool a simulated 6U electronic card using R134a. Simple drainage concepts were introduced to assist the drainage of both liquid and vapour on the heated surface. The results indicated a promising prospect of using a multi-nozzle array on large-area power electronics cooling. 16kW heat was removed from the 6U card area by maintaining the mean surface temperature below 26.5 C . Heat transfer coefficient up to 2.8 10 4 W / m 2 K was obtained, and liquid usage fraction as high as 0.88 was achieved before CHF occurred. It was found that increasing nozzle pressure drop or flow rate enhanced heat transfer and gave better surface temperature uniformity. Chamber pressure significantly influenced mean surface temperature, but had no observable effects on surface temperature uniformity. The control of chamber pressure can maintain a constant temperature on the heated surface when heat load varied largely. The results also showed that the spray-to-spray interactions had inconspicuous effects on local surface temperatures but rather the distance from a location relative to the drainage outlets.

J.L. Xie; Y.B. Tan; T.N. Wong; F. Duan; K.C. Toh; K.F. Choo; P.K. Chan; Y.S. Chua

2014-01-01T23:59:59.000Z

148

INVESTIGATION OF A DYNAMIC POWER LINE RATING CONCEPT FOR IMPROVED WIND ENERGY INTEGRATION OVER COMPLEX TERRAIN  

SciTech Connect (OSTI)

Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of power line to be based on real-time conductor temperature dependent on local weather conditions. In current practice overhead power lines are generally given a conservative rating based on worst case weather conditions. Using historical weather data collected over a test bed area, we demonstrate there is often additional transmission capacity not being utilized with the current static rating practice. We investigate a new dynamic line rating methodology using computational fluid dynamics (CFD) to determine wind conditions along transmission lines at dense intervals. Simulated results are used to determine conductor temperature by calculating the transient thermal response of the conductor under variable environmental conditions. In calculating the conductor temperature, we use both a calculation with steady-state assumption and a transient calculation. Under low wind conditions, steady-state assumption predicts higher conductor temperatures that could lead to curtailments, whereas transient calculations produce conductor temperatures that are significantly lower, implying the availability of additional transmission capacity.

Jake P. Gentle; Kurt S Myers; Tyler B Phillips; Inanc Senocak; Phil Anderson

2014-08-01T23:59:59.000Z

149

Improved Structure and Fabrication of Large, High-Power KHPS Rotors - Final Scientific/Technical Report  

SciTech Connect (OSTI)

Verdant Power, Inc, working in partnership with the National Renewable Energy Laboratory (NREL), Sandia National Laboratories (SNL), and the University of Minnesota St. Anthony Falls Laboratory (SAFL), among other partners, used evolving Computational Fluid Dynamics (CFD) and Finite Element Analysis (FEA) models and techniques to improve the structure and fabrication of large, high-power composite Kinetic Hydropower System (KHPS) rotor blades. The objectives of the project were to: design; analyze; develop for manufacture and fabricate; and thoroughly test, in the lab and at full scale in the water, the improved KHPS rotor blade.

Corren, Dean [Verdant Power, Inc.; Colby, Jonathan [Verdant Power, Inc.; Adonizio, Mary Ann [Verdant Power, Inc.

2013-01-29T23:59:59.000Z

150

2007 Wholesale Power Rate Case Initial Proposal : Load Resource Study and Documentation.  

SciTech Connect (OSTI)

The Load Resource Study (Study) represents the compilation of the loads, sales, contracts, and resource data necessary for developing BPA wholesale power rates. The results of this Study are used to: (1) provide base data to determine resource costs for the Revenue Requirement Study, WP-07-E-BPA-02; (2) provide regional hydro data for use in the secondary revenue forecast for the Market Power Study, WP-07-E-BPA-03; (3) provide base data to derive billing determinants for the revenue forecast in the Wholesale Power Rate Development Study (WPRDS), WP-07-E-BPA-05; and (4) provide load and resource data for use in calculating risk in the Risk Analysis Study, WP-07-E-BPA-04. This Study provides a synopsis of BPA's load resource analyses. This Study illustrates how each component is completed, how components relate to each other, and how each component fits into the rate development process. Details and results supporting this Study are contained in the Load Resource Documentation, WP-07-E-BPA-01A.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

151

The Origin of Power-Law Emergent Scaling in Large Binary Networks  

E-Print Network [OSTI]

In this paper we study the macroscopic conduction properties of large but finite binary networks with conducting bonds. By taking a combination of a spectral and an averaging based approach we derive asymptotic formulae for the conduction in terms of the component proportions p and the total number of components N. These formulae correctly identify both the percolation limits and also the emergent power law behaviour between the percolation limits and show the interplay between the size of the network and the deviation of the proportion from the critical value of p = 1/2. The results compare excellently with a large number of numerical simulations.

D. P. Almond; C. J. Budd; M. A. Freitag; G. W. Hunt; N. J. McCullen; N. D. Smith

2012-04-25T23:59:59.000Z

152

"Large Power Transformers and the U.S. Electric Grid" Report (June 2012) |  

Broader source: Energy.gov (indexed) [DOE]

"Large Power Transformers and the U.S. Electric Grid" Report (June "Large Power Transformers and the U.S. Electric Grid" Report (June 2012) "Large Power Transformers and the U.S. Electric Grid" Report (June 2012) The Office of Electricity Delivery and Energy Reliability has released the "Large Power Transformers and the U.S. Electric Grid" report, an assessment of the procurement and supply environment of large power transformers (LPTs). The report examines the characteristics and procurement of LPTs, including key raw materials and transportation; historical trends and future demands; global and domestic LPT suppliers; and potential issues in the global sourcing of LPTs. LPTs have long been a major concern for the U.S. electric power sector. Key industry sources - including the Energy Sector Specific Plan, the

153

"Large Power Transformers and the U.S. Electric Grid" Report (June 2012) |  

Broader source: Energy.gov (indexed) [DOE]

"Large Power Transformers and the U.S. Electric Grid" Report (June "Large Power Transformers and the U.S. Electric Grid" Report (June 2012) "Large Power Transformers and the U.S. Electric Grid" Report (June 2012) The Office of Electricity Delivery and Energy Reliability has released the "Large Power Transformers and the U.S. Electric Grid" report, an assessment of the procurement and supply environment of large power transformers (LPTs). The report examines the characteristics and procurement of LPTs, including key raw materials and transportation; historical trends and future demands; global and domestic LPT suppliers; and potential issues in the global sourcing of LPTs. LPTs have long been a major concern for the U.S. electric power sector. Key industry sources - including the Energy Sector Specific Plan, the

154

A Study of Options for the Deployment of Large Fusion Power Plants  

SciTech Connect (OSTI)

One option for making fusion power plants that could be competitive with other power plants operating during the 21st century is to make them large, e.g., 3 GW(electric) or more, to take advantage of the expected economies of scale. This study examines the effects on electrical utility system hardware, operations, and reliability of incorporating such large generating units. In addition, the study evaluates the use of the coproduction of hydrogen to reduce the grid-supplied electricity and offer the possibility for electrical load-following.The estimated additional cost of electricity (COE) for a large power plant is {approx}5 mills/kW.h. The estimated total COE for 3- to 4-GW(electric) fusion power plants lies in the range of 37 to 60 mills/kW.h.Future hydrogen costs from a variety of sources are estimated to lie in the range of 8 to 10 $/GJ, when allowance is made for some increase in natural gas price and for the possible need for greenhouse gas emission limitations.A number of combinations of fusion plant and electrolyzer were considered, including hot electrolyzers that use heat from the fusion plant. For the optimum cases, hydrogen produced from off-peak power from a 3- to 4-GW(electric) plant is estimated to have a competitive cost. Of particular interest, the cost would also be competitive if some hydrogen were produced during on-peak electricity cost periods. Thus, for a 4-GW(electric) plant, only up to 3 GW(electric) might be supplied to the grid, and load-following would be possible, which would be a benefit to the utility system.

Sheffield, John [Oak Ridge National Laboratory (United States); Brown, William [Duke Engineering and Services (United States); Garrett, Gary [Tennessee Valley Authority (United States); Hilley, James [Duke Engineering and Services (United States); McCloud, Dennis [Tennessee Valley Authority (United States); Ogden, Joan [Princeton University (United States); Shields, Thomas [Duke Engineering and Services (United States); Waganer, Lester [Boeing Company (United States)

2001-07-15T23:59:59.000Z

155

Vulnerability of the large-scale future smart electric power grid  

Science Journals Connector (OSTI)

Abstract The changing power flow pattern of the power system, with inclusion of large-scale renewable energy sources in the distribution side of the network, has been modeled by complex network framework based bidirectional graph. The bidirectional graph accommodates the reverse power flowing back from the distribution side to the grid in the model as a reverse edge connecting two nodes. The capacity of the reverse edge is equal to the capacity of the existing edge between the nodes in the forward directional nominal graph. Increased path in the combined model, built to facilitate grid reliability and efficiency, may serve as a bottleneck in practice with removal of certain percentage of nodes or edges. The effect of removal of critical elements has been analyzed in terms of increased path length, connectivity loss, load loss, and number of overloaded lines.

A.B.M. Nasiruzzaman; H.R. Pota; Most. Nahida Akter

2014-01-01T23:59:59.000Z

156

Application of CFB technology for large power generating units and CO{sub 2} capture  

SciTech Connect (OSTI)

Data on the development of the circulating fluidized bed (CFB) technology for combustion of fuels in large power generating units are examined. The problems with raising the steam parameters and unit power of boilers with a circulating fluidized bed are examined. With the boiler system at the 460 MW unit at Lagisza (Poland) as an example, the feasibility of raising the efficiency of units with CFB boilers through deep recovery of the heat of the effluent gases and reducing expenditure for in-house needs is demonstrated. Comparative estimates of the capital and operating costs of 225 and 330 MW units are used to determine the conditions for optimum use of CFB boilers in the engineering renovation of thermal power plants in Russia. New areas for the application of CFB technology in CO{sub 2} capture are analyzed in connection with the problem of reducing greenhouse gas emissions.

Ryabov, G. A., E-mail: georgy.ryabov@gmail.com; Folomeev, O. M.; Sankin, D. A.; Khaneev, K. V.; Bondarenko, I. G.; Mel'nikov, D. A. [JSC 'All-Russian Thermotechnical Institute' ('VTI') (Russian Federation)

2010-07-15T23:59:59.000Z

157

Power production of hydroelectric stations calculated for providing fuel to power systems with a large share of hydroelectric stations  

Science Journals Connector (OSTI)

1. With the existing capacity of fuel depots at thermal power stations in the Siberian power pool, the following...

A. Sh. Reznikovskii; M. I. Rubinshtein

1997-03-01T23:59:59.000Z

158

E-Print Network 3.0 - american large wind Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

installation capacity, growth rate, costs of wind power, small versus large wind turbines, and onshore ver- sus... strategies. Many large wind power generation facilities...

159

Effect of the shutdown of a large coal-fired power plant on ambient mercury  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Effect of the shutdown of a large coal-fired power plant on ambient mercury Effect of the shutdown of a large coal-fired power plant on ambient mercury species Title Effect of the shutdown of a large coal-fired power plant on ambient mercury species Publication Type Journal Article LBNL Report Number LBNL-6097E Year of Publication 2013 Authors Wang, Yungang, Jiaoyan Huang, Philip K. Hopke, Oliver V. Rattigan, David C. Chalupa, Mark J. Utell, and Thomas M. Holsen Journal Chemosphere Volume 92 Issue 4 Pagination 360-367 Date Published 07/2013 Abstract In the spring of 2008, a 260MWe coal-fired power plant (CFPP) located in Rochester, New York was closed over a 4 month period. Using a 2-years data record, the impacts of the shutdown of the CFPP on nearby ambient concentrations of three Hg species were quantified. The arithmetic average ambient concentrations of gaseous elemental mercury (GEM), gaseous oxidized mercury (GOM), and particulate mercury (PBM) during December 2007-November 2009 were 1.6ng/m3, 5.1pg/m3, and 8.9pg/m3, respectively. The median concentrations of GEM, GOM, and PBM significantly decreased by 12%, 73%, and 50% after the CFPP closed (Mann-Whitney test, p<0.001). Positive Matrix Factorization (EPA PMF v4.1) identified six factors including O3-rich, traffic, gas phase oxidation, wood combustion, nucleation, and CFPP. When the CFPP was closed, median concentrations of GEM, GOM, and PBM apportioned to the CFPP factor significantly decreased by 25%, 74%, and 67%, respectively, compared to those measured when the CFPP was still in operation (Mann-Whitney test, p<0.001). Conditional probability function (CPF) analysis showed the greatest reduction in all three Hg species was associated with northwesterly winds pointing toward the CFPP. These changes were clearly attributable to the closure of the CFPP.

160

2007 Wholesale Power Rate Case Final Proposal : Load Resource Study and Documentation.  

SciTech Connect (OSTI)

The Load Resource Study (Study) represents the compilation of the load and contract obligations, contact purchases, and resource data necessary for developing BPA's wholesale power rates. The results of this Study are used to: (1) provide data to determine resource costs for the Revenue Requirement Study, WP-07-FS-BPA-02; (2) provide data to derive billing determinants for the revenue forecast in the Wholesale Power Rate Development Study (WPRDS), WP-07-FS-BPA-05; (3) provide load and resource data for use in the Risk Analysis Study, WP-07-FS-BPA-04; and (4) provide regional hydro data for use in the secondary revenue forecast for the Market Price Forecast Study, WP-07-FS-BPA-03. This Study provides a synopsis of BPA's load resource analyses. This Study illustrates how each component is completed, how components relate to each other, and how each component fits into the rate development process. Details and results supporting this Study are contained in the Load Resource Study Documentation, WP-07-FS-BPA-01A.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Advanced regulatory control and coordinated plant-wide control strategies for IGCC targeted towards improving power ramp-rates  

SciTech Connect (OSTI)

As part of ongoing R&D activities at the National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training & Research (AVESTAR) Center, this paper highlights strategies for enhancing low-level regulatory control and system-wide coordinated control strategies implemented in a high-fidelity dynamic simulator for an Integrated Gasification Combined Cycle (IGCC) power plant with carbon capture. The underlying IGCC plant dynamic model contains 20 major process areas, each of which is tightly integrated with the rest of the power plant, making individual functionally-independent processes prone to routine disturbances. Single-loop feedback control although adequate to meet the primary control objective for most processes, does not take into account in advance the effect of these disturbances, making the entire power plant undergo large offshoots and/or oscillations before the feedback action has an opportunity to impact control performance. In this paper, controller enhancements ranging from retuning feedback control loops, multiplicative feed-forward control and other control techniques such as split-range control, feedback trim and dynamic compensation, applicable on various subsections of the integrated IGCC plant, have been highlighted and improvements in control responses have been given. Compared to using classical feedback-based control structure, the enhanced IGCC regulatory control architecture reduces plant settling time and peak offshoots, achieves faster disturbance rejection, and promotes higher power ramp-rates. In addition, improvements in IGCC coordinated plant-wide control strategies for Gasifier-Lead, GT-Lead and Plantwide operation modes have been proposed and their responses compared. The paper is concluded with a brief discussion on the potential IGCC controller improvements resulting from using advanced process control, including model predictive control (MPC), as a supervisory control layer.

Mahapatra, P.; Zitney, S.

2012-01-01T23:59:59.000Z

162

Power spectrum of large-scale magnetic fields from Gravitoelectromagnetic inflation with a decaying cosmological parameter  

E-Print Network [OSTI]

Introducing a variable cosmological parameter $\\Lambda (t)$ in a geometrical manner from a 5D Riemann-flat metric, we investigate the origin and evolution of primordial magnetic fields in the early universe, when the expansion is governed by a cosmological parameter $\\Lambda (t)$ that decreases with time. Using the gravitoelectromagnetic inflationary formalism, but without the Feynman gauge, we obtain the power of spectrums for large-scale magnetic fields and the inflaton field fluctuations during inflation. A very important fact is that our formalism is {\\em naturally non-conformally invariant}.

Federico Agustin Membiela; Mauricio Bellini

2007-12-18T23:59:59.000Z

163

AC Resonant charger with charge rate unrelated to primary power frequency  

DOE Patents [OSTI]

An AC resonant charger for a capacitive load, such as a PFN, is provided with a variable repetition rate unrelated to the frequency of a multi-phase AC power source by using a control unit to select and couple the phase of the power source to the resonant charger in order to charge the capacitive load with a phase that is the next to begin a half cycle. For optimum range in repetition rate and increased charging voltage, the resonant charger includes a step-up transformer and full-wave rectifier. The next phase selected may then be of either polarity, but is always selected to be of a polarity opposite the polarity of the last phase selected so that the transformer core does not saturate. Thyristors are used to select and couple the correct phase just after its zero crossover in response to a sharp pulse generated by a zero-crossover detector. The thyristor that is turned on then automatically turns off after a full half cycle of its associated phase input. A full-wave rectifier couples the secondary winding of the transformer to the load so that the load capacitance is always charged with the same polarity.

Watson, Harold (Torrance, CA)

1982-01-01T23:59:59.000Z

164

2007 Wholesale Power Rate Case Final Proposal : Risk Analysis Study Documentation.  

SciTech Connect (OSTI)

The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-FS-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-FS-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-FS-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-FS-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-FSBPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the ToolKit Model to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard. The processes and interaction between each of the models and studies are depicted in Graph 1.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

165

2007 Wholesale Power Rate Case Initial Proposal : Risk Analysis Study Documentation.  

SciTech Connect (OSTI)

The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-E-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-E-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-E-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-E-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-E-BPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the ToolKit Model to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard. The processes and interaction between each of the models and studies are depicted in Graph 1.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

166

A Tutorial on Detection and Characterization of Special Behavior in Large Electric Power Systems  

SciTech Connect (OSTI)

The objective of this document is to report results in the detection and characterization of special behavior in large electric power systems. Such behavior is usually dynamic in nature, but not always. This is also true for the underlying sources of special behavior. At the device level, a source of special behavior might be an automatic control system, a dynamic load, or even a manual control system that is operated according to some sharply defined policy. Other possible sources include passive system conditions, such as the state of a switched device or the amount of power carried on some critical line. Detection and characterization are based upon signature information that is extracted from the behavior observed. Characterization elements include the signature information itself, the nature of the behavior and its likely causes, and the associated implications for the system or for the public at large. With sufficient data and processing, this characterization may directly identify a particular condition or device at a specific location. Such conclusive results cannot always be done from just one observation, however. Information environments that are very sparse may require multiple observations, comparative model studies, and even direct testing of the system.

Hauer, John F.; DeSteese, John G.

2004-08-20T23:59:59.000Z

167

Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India, NW Himalaya)  

E-Print Network [OSTI]

Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India private hydroelectric facility, located at the Baspa River which is an important left-hand tributary

Bookhagen, Bodo

168

Power and transmission rate orders and related documents. Office of Power Marketing Coordination, data compiled January 1, 1980-December 31, 1981  

SciTech Connect (OSTI)

This publication contains the power and transmission rate orders and related documents issued by the Department of Energy. It covers calendar years 1980 and 1981. The first publication, DOE/CE-007 covering the period from March through December 1979, was published July 1981. This publication is a compilation of all rate orders issued by the Assistant Secretary for Resource Applications and the Assistant Secretary for Conservation and Renewable Energy during calendar years 1980 and 1981 under Delegation Order No. 0204-33. It also includes all final approvals, remands, and disapprovals by the FERC, and a petition to the FERC for reconsideration by a Power Marketing Administration during 1980 and 1981. Also included are two delegation orders along with an amendment and a supplement to one delegation order, a departmental order on financial reporting, and Power and Transmission Rate Adjustment Procedures relating to federal power marketing.

None

1982-08-01T23:59:59.000Z

169

Reply to comment by Claude Michel on ``A general power equation for predicting bed load transport rates in gravel  

E-Print Network [OSTI]

Reply to comment by Claude Michel on ``A general power equation for predicting bed load transport Michel on ``A general power equation for predicting bed load transport rates in gravel bed rivers of our transport equation. [2] Although some bed load transport data exhibit non- linear trends in log

170

Some perspectives on the use of powerful gyrotrons for the electron-cyclotron plasma heating in large tokamaks  

Science Journals Connector (OSTI)

The main problems for the further development of high efficiency powerful gyrotrons are obviously the elaboration of electron guns with a large current density and the ensuring of a stable single-mode operatio...

A. V. Gaponov; V. A. Flyagin; A. Sh. Fix

1980-09-01T23:59:59.000Z

171

Dense, low-power sensor network for three-dimensional thermal characterization of large-scale atria spaces  

E-Print Network [OSTI]

We describe the design and implementation of a dense, low-power wireless sensor network for fine-grained three-dimensional thermal characterization of a large open indoor space. To better understand the airflow dynamics ...

Gong, Nan-Wei

172

2007 Wholesale Power Rate Case Final Proposal : Market Price Forecast Study.  

SciTech Connect (OSTI)

This study presents BPA's market price forecasts for the Final Proposal, which are based on AURORA modeling. AURORA calculates the variable cost of the marginal resource in a competitively priced energy market. In competitive market pricing, the marginal cost of production is equivalent to the market-clearing price. Market-clearing prices are important factors for informing BPA's power rates. AURORA was used as the primary tool for (a) estimating the forward price for the IOU REP Settlement benefits calculation for fiscal years (FY) 2008 and 2009, (b) estimating the uncertainty surrounding DSI payments and IOU REP Settlements benefits, (c) informing the secondary revenue forecast and (d) providing a price input used for the risk analysis. For information about the calculation of the secondary revenues, uncertainty regarding the IOU REP Settlement benefits and DSI payment uncertainty, and the risk run, see Risk Analysis Study WP-07-FS-BPA-04.

United States. Bonneville Power Administration.

2006-07-01T23:59:59.000Z

173

Understanding the Impact of Large-Scale Penetration of Micro Combined Heat & Power Technologies within Energy Systems  

E-Print Network [OSTI]

Understanding the Impact of Large-Scale Penetration of Micro Combined Heat & Power Technologies of Micro Combined Heat & Power Technologies within Energy Systems by Karen de los Ángeles Tapia for this purpose. Co-generation of electricity and heat at the residential level, known as micro

Catholic University of Chile (Universidad Católica de Chile)

174

Property:OpenEI/UtilityRate/DemandReactivePowerCharge | Open Energy  

Open Energy Info (EERE)

DemandReactivePowerCharge DemandReactivePowerCharge Jump to: navigation, search This is a property of type Number. Pages using the property "OpenEI/UtilityRate/DemandReactivePowerCharge" Showing 25 pages using this property. (previous 25) (next 25) 0 00b7ccdc-c7e0-40d2-907f-acb6ae828292 + 0.25 + 00e0b930-90c6-43c2-971a-91dade33f76a + 0.32 + 00e2a43f-6844-417a-b459-edf32d33b051 + 0.0092 + 00fb7dca-d0a6-4b11-b7de-791c2fb9f2e1 + 2.7 + 01a64840-7edc-4193-8073-ed5604e098ca + 0.83 + 035f3d22-3650-47cc-a427-bb35170db128 + 0.3 + 042f06f4-6a5b-424f-a31f-8e1c5a838700 + 0.27 + 0479cd85-894d-412b-b2ce-3b96912e9014 + 0.2 + 04bab597-fe1e-4507-8d90-144980aeba73 + 0.3 + 05211bd7-b6d3-425c-9f96-0845b7828c3c + 0.27 + 052fbe23-ac02-4195-b76d-e572cc53f669 + 0.68 + 05490683-8158-4d2f-ad96-66d5e4980890 + 0.25 +

175

Improved agreement of foot segmental power and rate of energy change during gait: Inclusion of distal power terms and use of three-dimensional models  

Science Journals Connector (OSTI)

Traditional models used to calculate foot segmental power have yielded poor agreement between foot power and the rate of energy change during the stance phase of gait and limited the applicability of foot segmental power analyses to swing phase only. The purpose of this study was to improve the agreement of foot segemental power and rate of energy change by using more inclusive models to calculate foot segmental power and energy. The gait of 15 adult subjects was studied and models were used to calculate foot segmental power that included either the proximal terms only (Model P, the most common method in the literature) or both proximal and distal terms (Model PD, a mathematically complete model). Power and energy terms were computed in to ways, from sagittal plane vector components only (two-dimensional condition) and from complete three-dimensional components (three-dimensional condition). Results revealed that the more inclusive the model, the higher the agreement of foot power and rate of energy change. During stance phase, Model P produced poor agreement (rc = 0.108) for both two-dimensional and three-dimensional conditions, Model PD-2D yielded higher agreement (rc = 0.645), and Model PD-3D exhibited nearly perfect agreement (rc = 0.956). The advantages of a segmental power analysis include the ability to identify the mechanisms of energy transfer into and out of the foot during movement. The results of this study suggest that foot power analyses are valid when using Model PD-3D to describe foot function during locomotion.

Karen Lohmann Siegel; Thomas M. Kepple; Graham E. Caldwell

1996-01-01T23:59:59.000Z

176

Resiliency Analysis of Large-Scale Renewable Enriched Power Grid: A Network Percolation-Based Approach  

Science Journals Connector (OSTI)

Recent trend of integrating renewable energy into the power grid poses new challenges like power quality, voltage ... . The trouble encountered in analyzing systems like power grid is that individual behavior of ...

A. B. M. Nasiruzzaman; H. R. Pota

2014-01-01T23:59:59.000Z

177

Equivalencing the Collector System of a Large Wind Power Plant: Preprint  

SciTech Connect (OSTI)

This paper focuses on our effort to develop an equivalent representation of a wind power plant collector system for power system planning studies.

Muljadi, E.; Butterfield, C. P.; Ellis, A.; Mechenbier, J.; Hochheimer, J.; Young, R.; Miller, N.; Delmerico, R.; Zavadil, R.; Smith, J. C.

2006-01-01T23:59:59.000Z

178

Large scale simulations of solar type III radio bursts: flux density, drift rate, duration and bandwidth  

E-Print Network [OSTI]

Non-thermal electrons accelerated in the solar corona can produce intense coherent radio emission, known as solar type III radio bursts. This intense radio emission is often observed from hundreds of MHz in the corona down to the tens of kHz range in interplanetary space. It involves a chain of physical processes from the generation of Langmuir waves to nonlinear processes of wave-wave interaction. We develop a self-consistent model to calculate radio emission from a non-thermal electron population over large frequency range, including the effects of electron transport, Langmuir wave-electron interaction, the evolution of Langmuir waves due to non-linear wave-wave interactions, Langmuir wave conversion into electromagnetic emission, and finally escape of the electromagnetic waves. For the first time we simulate escaping radio emission over a broad frequency range from 500~MHz down to a few MHz and infer key properties of the radio emission observed: the onset (starting) frequency, {identification as fundament...

Ratcliffe, H; Reid, H A S

2014-01-01T23:59:59.000Z

179

Characterisation of large solid recovered fuel particles for direct co-firing in large PF power plants  

Science Journals Connector (OSTI)

Solid Recovered Fuels (SRF) are solid fuels prepared from high calorific fractions of non-hazardous waste materials intended to be co-fired in coal power plants and industrial furnaces (CEN/TC 343, Solid Recovered Fuels, 2003). They are composed of variety of materials of which some, although recyclable in theory, may have become in forms that made their recycling an unsound option. The SRF with an equivalent median diameter D50 of 6.8mm are to be directly co-fired in an existing pulverised coal power plant. In comparison to pulverised coal, the particle size distribution of the SRF is of several magnitudes higher, resulting in a different burnout behaviour. Size reduction of the SRF to a fraction similar to coal is not economically feasible. As such, the idea is to co-fire SRF without any further size reduction, and of course this proceeding bears the risk of incomplete combustion. Accordingly, the prediction of the burner levels at which the SRF should be injected and whether or not a complete combustion will be achieved under full and part load conditions are the primary objectives of this paper. In this work, laboratory experiments have been conducted to forecast the success of co-firing the SRF in a commercial pulverised coal power plant. It involves the analyses of the fuel and its intermediate chars, generated at conditions comparable to boiler conditions, to determine some characteristic parameters, namely the burnout time, the aerodynamic lift velocity (ALV), and the apparent densities. The information gathered from the lab experiments are correlated to boiler conditions to determine the possible distances they are likely to travel under various regimes, full load and part load, before they are completely consumed. Different scenarios are examined, and based on the results, the optimal boiler injection points are predicted.

Gregory Dunnu; Jrg Maier; Thomas Hilber; Gnter Scheffknecht

2009-01-01T23:59:59.000Z

180

THE SCALE-UP OF LARGE PRESSURIZED FLUIDIZED BEDS FOR ADVANCED COAL-FIRED POWER PROCESSES  

SciTech Connect (OSTI)

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor an agency thereof, nor any of the their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, A combined-cycle High Performance Power System (HIPPS) capable of overall cycle efficiencies approaching 50% has been proposed and designed by Foster Wheeler Development Corporation (FWDC). A pyrolyzer in the first stage of the HIPPS process converts a coal feedstock into fuel gas and char at an elevated pressure of 1.4 Map. (206 psia) and elevated temperature of 930 C (1700 F). The generated char serves as the feedstock for a Pulverized Coal (PC) boiler operating at atmospheric pressure, and the fuel gas is directly fired in a gas turbine. The hydrodynamic behavior of the pyrolyzer strongly influences the quality of both the fuel gas and the generated char, the energy split between the gas turbine and the steam turbine, and hence the overall efficiency of the system. By utilizing a simplified set of scaling parameters (Glicksman et al.,1993), a 4/7th labscale cold model of the pyrolyzer operating at ambient temperature and pressure was constructed and tested. The scaling parameters matched include solid to gas density ratio, Froude number, length to diameter ratio; dimensionless superficial gas velocity and solid recycle rate, particle sphericity and particle size distribution (PSD).

Leon R. Glicksman; Michael Louge; Hesham F. Younis; Richard Tan; Mathew Hyre; Mark Torpey

2003-11-24T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Feasibility Study of a Multi-Purpose Computer Program for Optimizing Heat Rates in Power Cycles  

E-Print Network [OSTI]

and future needs of the power industry follows. The discussion is restricted to steam turbine cycles of fossil or nuclear power plants, although some ECC's can be employed to a wider range of applications, such as analysis of different heat sources... and future needs of the power industry follows. The discussion is restricted to steam turbine cycles of fossil or nuclear power plants, although some ECC's can be employed to a wider range of applications, such as analysis of different heat sources...

Menuchin, Y.; Singh, K. P.; Hirota, N.

1981-01-01T23:59:59.000Z

182

7-88 A geothermal power plant uses geothermal liquid water at 160C at a specified rate as the heat source. The actual and maximum possible thermal efficiencies and the rate of heat rejected from this power plant  

E-Print Network [OSTI]

and potential energy changes are zero. 3 Steam properties are used for geothermal water. Properties Using7-31 7-88 A geothermal power plant uses geothermal liquid water at 160ºC at a specified rate saturated liquid properties, the source and the sink state enthalpies of geothermal water are (Table A-4) k

Bahrami, Majid

183

Rates & Repayment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Rates and Repayment Services Rates Current and Historical Rate Information Collbran Power Rates CRSP Power Rates CRSP Transmission System Rates CRSP Management Center interest rates Falcon-Amistad Power Rates Provo River Power Rates Rio Grande Power Rates Seedskadee Power Rates SLCA/IP Power Rates Rate Schedules & Supplemental Rate Information Current Rates for Firm Power, Firm & Non-firm Transmission Service, & Ancillary Services Current Transmission & Ancillary Services Rates Tariffs Components of the SLCA/IP Existing Firm Power Rate Cost Recovery Charge (CRC) Page MOA Concerning the Upper Colorado River Basin

184

Models for Assessing Power Fluctuations from Large Wind Farms N. A. Cutululis1)  

E-Print Network [OSTI]

typical and worst case power fluctuations using the geographical sitting of wind turbines as an input comprehensive, with one year of wind speeds and power from all individual wind turbines in the wind farms of the fluctuating nature of wind speeds, the increasing use of wind turbines for power generation has caused more

185

Hard Data on Soft Errors: A Large-Scale Assessment of Real-World Error Rates in GPGPU  

E-Print Network [OSTI]

Graphics processing units (GPUs) are gaining widespread use in computational chemistry and other scientific simulation contexts because of their huge performance advantages relative to conventional CPUs. However, the reliability of GPUs in error-intolerant applications is largely unproven. In particular, a lack of error checking and correcting (ECC) capability in the memory subsystems of graphics cards has been cited as a hindrance to the acceptance of GPUs as high-performance coprocessors, but the impact of this design has not been previously quantified. In this article we present MemtestG80, our software for assessing memory error rates on NVIDIA G80 and GT200-architecture-based graphics cards. Furthermore, we present the results of a large-scale assessment of GPU error rate, conducted by running MemtestG80 on over 20,000 hosts on the Folding@home distributed computing network. Our control experiments on consumer-grade and dedicated-GPGPU hardware in a controlled environment found no errors. However, our su...

Haque, Imran S

2009-01-01T23:59:59.000Z

186

High Average Power, 100 Hz Repetition Rate, Table-top EUV/Soft X-ray Lasers  

SciTech Connect (OSTI)

Compact =13.9 nm and =18.9 nm lasers with >0.1 mW average power at 100 Hz repetition rate driven by a diode-pumped, 1 J, CPA laser were demonstrated. Wavelength scaling to =10.9 nm will be discussed.

Reagan, Brendon [Colorado State University, Fort Collins; Wernsing, Keith [Colorado State University, Fort Collins; Baumgarten, Cory [Colorado State University, Fort Collins; Durivage, Leon [Colorado State University, Fort Collins; Berrill, Mark A [ORNL; Furch, Federico [Colorado State University, Fort Collins; Curtis, Alden [Colorado State University, Fort Collins; Salsbury, Chase [Colorado State University, Fort Collins; Luther, Brad [Colorado State University, Fort Collins; Patel, Dinesh [Colorado State University, Fort Collins; Menoni, Carmen [Colorado State University, Fort Collins; Rocca, Jorge [Colorado State University, Fort Collins

2013-01-01T23:59:59.000Z

187

The Power Spectrum of Rich Clusters of Galaxies on Large Spatial Scales  

E-Print Network [OSTI]

We present an analysis of the redshift-space power spectrum, $P(k)$, of rich clusters of galaxies based on an automated cluster catalogue selected from the APM Galaxy Survey. We find that $P(k)$ can be approximated by a power law, $P(k)\\proptok^{n}$, with $n\\approx-1.6$ over the wavenumber range $0.04\\hrpower spectrum has the same shape as the power spectra measured for optical and IRAS galaxies. This is consistent with a simple linear bias model in which different tracers have the same power spectrum as that of the mass distribution but shifted in amplitude by a constant biasing factor. On larger scales, the power spectrum of APM clusters flattens and appears to turn over on a scale $k \\sim 0.03\\hmpcrev$. We compare the power spectra estimated from simulated APM cluster catalogues to those estimated directly from cubical N-body simulation volumes and find that the APM cluster survey should give reliable estimates of the true power spectrum at wavenumbers $k \\simgt 0.02\\hmpcrev$. These results suggest that the observed turn-over in the power spectrum may be a real feature of the cluster distribution and that we have detected the transition to a near scale-invariant power spectrum implied by observations of anisotropies in the cosmic microwave background radiation. The scale of the turn-over in the cluster power spectrum is in good agreement with the scale of the turn-over observed in the power spectrum of APM galaxies.

Helen Tadros; George Efstathiou; Gavin Dalton

1997-08-28T23:59:59.000Z

188

Power corrections in heavy-to-light decays at large recoil energy  

E-Print Network [OSTI]

I briefly present recent work on QCD power corrections in heavy-to-light meson decays, using an effective field theory approach.

M. Diehl

2002-10-02T23:59:59.000Z

189

Grid planning with a large amount of small scale solar power.  

E-Print Network [OSTI]

?? With an increasing interest for renewable power, photovoltaics (PV) have becomemore and more common in the distribution network. If a customer wants to install (more)

Hagstrm, Emil

2013-01-01T23:59:59.000Z

190

Self-Adaptive Power Management of Idle Nodes in Large Scale Systems  

E-Print Network [OSTI]

to balance between the systems energy consumption and the response time is a key problem in the power of idle nodes to achieve low energy consumption and high performance at the same time. The proposed the power usage of a middle scale city. In 2006, US servers and data centers consumed around 61 billion k

Zhu, Hong

191

Fuzzy Failure Rate for Nuclear Power Plant Probabilistic Safety Assessment by Fault Tree Analysis  

Science Journals Connector (OSTI)

Reliability data is essential for a nuclear power plant probabilistic safety assessment by fault tree analysis ... a failure possibility-based reliability algorithm to assess nuclear event reliability data from f...

Julwan Hendry Purba; Jie Lu; Guangquan Zhang

2012-01-01T23:59:59.000Z

192

Standard for the determination of steady-state neutron reaction-rate distributions and reactivity of nuclear power reactors  

SciTech Connect (OSTI)

American National Standard ANSI/ANS*-19.3-2005 [1] covers 'The Determination of Steady-State Neutron Reaction-Rate Distributions and Reactivity of Nuclear Power Reactors'. The 2005 version is a new revision of this Standard, which had previously been issued in 1995. In this revision, the sections on the various types of power reactors have been updated to cover the latest methodologies of calculation in current use, and a section on HWR [CANDU{sup R}] reactors has been added. Also, the sections on verification and validation were revised to more fully define, discuss, and distinguish between these topics, and describe actions related to them. (authors)

Rouben, B. [Atomic Energy of Canada Limited, 2251 Speakman Drive, Mississauga, Ont. L5K 1B2 (Canada)

2006-07-01T23:59:59.000Z

193

NREL Confirms Large Potential for Grid Integration of Wind, Solar Power (Fact Sheet)  

SciTech Connect (OSTI)

To fully harvest the nation's bountiful wind and solar resources, it is critical to know how much electrical power from these renewable resources could be integrated reliably into the grid. To inform the discussion about the potential of such variable sources, the National Renewable Energy Laboratory (NREL) launched two key regional studies, examining the east and west sections of the U.S. power grid. The studies show that it is technically possible for U.S. power systems to integrate 20%-35% renewable electricity if infrastructure and operational improvements can be made.

Not Available

2011-10-01T23:59:59.000Z

194

A fast global optimization approach to VAR planning for the large scale electric power systems  

SciTech Connect (OSTI)

In this paper, an innovative fast global optimization technique, Hybrid Partial Gradient Descent/Simulated Annealing (HPGDSA), for optimal VAR planning is presented. The HPGDSA is introduced to search the global optimal solution considering both quality and speed at the same time. The basic idea of the HPGDSA is that partial gradient descent and simulated annealing alternate with each other such that it reduces the CPU time of the conventional Simulated Annealing (SA) method while retaining the main characteristics of SA, i.e., the ability to get the global optimal solution. The HPGDSA was applied to a practical power system, Taiwan Power System (Tai-Power System), with satisfactory results.

Liu, C.W.; Jwo, W.S.; Liu, C.C. [National Taiwan Univ., Taipei (Taiwan, Province of China). Dept. of Electrical Engineering; Hsiao, Y.T. [Tamkang Univ., Taipei (Taiwan, Province of China). Dept. of Electrical Engineering

1997-02-01T23:59:59.000Z

195

Grid planning with a large amount of small scale solar and wind power.  

E-Print Network [OSTI]

?? The total energy demand in the world is expected to increase in the future years due to thehigh development rate of developing countries. Access (more)

Fernndez Martnez, Alberto

2013-01-01T23:59:59.000Z

196

Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa.  

E-Print Network [OSTI]

??Includes abstract. This study investigates the requirements and implications if South Africa were to evolve its electricity supply structure to a large emphasis on Concentrated (more)

Morse, Warren.

2009-01-01T23:59:59.000Z

197

Impacts of large quantities of wind energy on the electric power system  

E-Print Network [OSTI]

Wind energy has been surging on a global scale. Significant penetration of wind energy is expected to take place in the power system, bringing new challenges because of the variability and uncertainty of this renewable ...

Yao, Yuan, S.M. Massachusetts Institute of Technology

2011-01-01T23:59:59.000Z

198

Rate constants for OH with selected large alkanes : shock-tube measurements and an improved group scheme.  

SciTech Connect (OSTI)

High-temperature rate constant experiments on OH with the five large (C{sub 5}-C{sub 8}) saturated hydrocarbons n-heptane, 2,2,3,3-tetramethylbutane (2,2,3,3-TMB), n-pentane, n-hexane, and 2,3-dimethylbutane (2,3-DMB) were performed with the reflected-shock-tube technique using multipass absorption spectrometric detection of OH radicals at 308 nm. Single-point determinations at {approx}1200 K on n-heptane, 2,2,3,3-TMB, n-hexane, and 2,3-DMB were previously reported by Cohen and co-workers; however, the present work substantially extends the database to both lower and higher temperature. The present experiments span a wide temperature range, 789-1308 K, and represent the first direct measurements of rate constants at T > 800 K for n-pentane. The present work utilized 48 optical passes corresponding to a total path length of {approx}4.2 m. As a result of this increased path length, the high OH concentration detection sensitivity permitted pseudo-first-order analyses for unambiguously measuring rate constants. The experimental results can be expressed in Arrhenius form in units of cm{sup 3} molecule{sup -1} s{sup -1} as follows: K{sub OH+n-heptane} = (2.48 {+-} 0.17) x 10{sup -10} exp[(-1927 {+-} 69 K)/T] (838-1287 K); k{sub OH+2,2,3,3-TMB} = (8.26 {+-} 0.89) x 10{sup -11} exp[(-1337 {+-} 94 K)/T] (789-1061 K); K{sub OH+n-pentane} = (1.60 {+-} 0.25) x 10{sup -10} exp[(-1903 {+-} 146 K)/T] (823-1308 K); K{sub OH+n-hexane} = (2.79 {+-} 0.39) x 10{sup -10} exp[(-2301 {+-} 134 K)/T] (798-1299 K); and k{sub OH+2,3-DMB} = (1.27 {+-} 0.16) x 10{sup -10} exp[(-1617 {+-} 118 K)/T] (843-1292 K). The available experimental data, along with lower-T determinations, were used to obtain evaluations of the experimental rate constants over the temperature range from {approx}230 to 1300 K for most of the title reactions. These extended-temperature-range evaluations, given as three-parameter fits, are as follows: k{sub OH+n-heptane} = 2.059 x 10{sup -5}T{sup 1.401} exp(33 K/T) cm{sup 3} molecule{sup -1} s{sup -1} (241-1287 K); k{sub OH+2,2,3,3-TMB} = 6.835 x 10{sup -17}T{sup 1.886} exp(-365 K/T) cm{sup 3} molecule{sup -1} s{sup -1} (290-1180 K); k{sub OH+n-pentane} = 2.495 x 10{sup -16}T{sup 1.649} exp(80 K/T) cm{sup 3} molecule{sup -1} s{sup -1} (224-1308 K); k{sub OH+n-hexane} = 3.959 x 10{sup -18}T{sup 2.218} exp(443 K/T) cm{sup 3} molecule{sup -1} s{sup -1} (292-1299 K); and k{sub OH+2,3-DMB} = 2.287 x 10{sup -17}T{sup 1.958} exp(365 K/T) cm{sup 3} molecule{sup -1} s{sup -1} (220-1292 K). The experimental data and the evaluations obtained for these five larger alkanes in the present work were used along with prior data/evaluations obtained in this laboratory for H abstractions by OH from a series of smaller alkanes (C{sub 3}?C{sub 5}) to devise rate rules for abstractions from various types of primary, secondary, and tertiary H atoms. Specifically, the current scheme was applied with good success to H abstractions by OH from a series of n-alkanes (n-octane through n-hexadecane). The total rate constants using this group scheme for reactions of OH with selected large alkanes are given as three-parameter fits in this article. The rate constants for the various abstraction channels in any large n-alkane can also be obtained using the groups listed in this article. The present group scheme serves to reduce the uncertainties in rate constants for OH + alkane reactions.

Sivaramakrishnan, R.; Michael, J. V.; Chemical Sciences and Engineering Division

2009-04-30T23:59:59.000Z

199

Record of Decision for the Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates (DOE/EIS-0183) (6/30/03)  

Broader source: Energy.gov (indexed) [DOE]

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION NATIONAL ENVIRONMENTAL POLICY ACT RECORD OF DECISION for the Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates INTRODUCTION The Bonneville Power Administration (BPA) has decided to implement its proposed Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates. This rate adjustment allows BPA to address potential revenue shortfalls and recover its costs through rates. This rate adjustment involves implementation of one of BPA's existing risk mitigation tools that has been previously subject to review under the National Environmental Policy Act (NEPA), as described more fully below. I have reviewed this previous NEPA documentation and determined that the SN CRAC rate adjustment is adequately covered within

200

Delay Bounded Rate and Power Control in Energy Harvesting Wireless Networks  

E-Print Network [OSTI]

in environmentally powered wireless networks with bursty packet arrivals. Varying the size of the energy storage unit such as solar energy, mechanical energy and thermal energy have started finding use in wireless sensor networks, followed by an energy storage unit. The energy harvested by the front end is stored in the storage unit

Rajan, Dinesh

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Greenhouse Gas Emissions from Operating Reserves Used to Backup Large-Scale Wind Power  

Science Journals Connector (OSTI)

Power systems already carry significant reserves to compensate for errors in electricity load forecasts or unexpected power plant outages. ... It first specifies the probability distributions for forecast errors at hypothetical wind farm sites, and the correlation between those sites, based on statistical data from 10 existing wind farms. ... This work has also assumed that ample transmission capacity is available to move reserves throughout the region; in reality there may be trade-offs between the cost of transmission upgrades, vs losses on long-distance lines, vs reductions in reserve requirements. ...

Matthias Fripp

2011-07-28T23:59:59.000Z

202

Application of CFB technology for large power generating units and CO2 capture  

Science Journals Connector (OSTI)

Data on the development of the circulating fluidized bed (CFB) technology for combustion of fuels in large ... feasibility of raising the efficiency of units with CFB boilers through deep recovery of the heat ......

G. A. Ryabov; O. M. Folomeev; D. A. Sankin

2010-07-01T23:59:59.000Z

203

Sensitivity Analysis of the Power Grid Vulnerability to Large-Scale Cascading Failures  

E-Print Network [OSTI]

, Survivability. 1. INTRODUCTION The power grid is vulnerable to natural disasters, such as earthquakes and solar life, as many systems (e.g., telecommunications, gas and wa- ter supply, and transportation) highly blackout in Italy [10] and the Apr. 2012 blackout in Cyprus [16]), and Asia (India's blackout in July 2012

Shepard, Kenneth

204

DECENTRALIZED REAL-TIME MANAGEMENT LARGELY UNPREDICTABLE POWER NEEDS AND SUPPLY  

E-Print Network [OSTI]

to decentralized and adaptive electric power manage- ment through a distributed real-time multi-agent architecture briefly outline a two-stage distributed negotiation algo- rithm, for day-ahead planning and handling Keywords: distributed real-time systems, embedded systems, safety-critical systems, dis- tributed energy

Wedde, Horst F.

205

Identification of Market Power in Large-Scale Electric Energy Markets Bernard C. Lesieutre  

E-Print Network [OSTI]

identify market power such as the HHI, pivotal supplier index, and residual supplier index (RSI)[6] when applied to the entire network do not completely address the issue of load pockets.(See [7 and sometimes are applied to smaller portions of the network. For example, in [5] the HHI index is applied

206

The influence of large-scale wind power on global climate  

Science Journals Connector (OSTI)

...of primary energy (1). The...role in global energy supply when...power is a renewable resource...of kinetic energy at the ?100-m...developed at the National Center for...for 50 yr of integration, {delta...horizontal grid) (7). Experiments...climate; the challenge is to relate...

David W. Keith; Joseph F. DeCarolis; David C. Denkenberger; Donald H. Lenschow; Sergey L. Malyshev; Stephen Pacala; Philip J. Rasch

2004-01-01T23:59:59.000Z

207

Variable firing rate power burner for high efficiency gas furnaces. Final report  

SciTech Connect (OSTI)

One method for increasing the efficiency of residential furnaces and boilers is to retrofit a burner capable of firing rate (FR) modulation. While maximum FR is still attainable, the average FR is significantly lower, resulting in more effective heat exchanger performance. Equally important is the capability for continuous firing at a very low rate (simmering) which eliminates off-cycle loss, a heavy contributor to inefficiency. Additional performance can be gained by reducing the excess air required by a burner. Based on its previous experience, Foster-Miller Associates, Inc. has designed and tested a low excess air (about 15%) variable firing rate (VFR) burner. The theory of operation and the construction of the test burner are described. Test results are given along with a conclusion/recommendation. A Phase II plan is outlined which suggests methods and steps for fabrication and field testing of a number of prototype units.

Fuller, H.H.; Demler, R.L.; Poulin, E.

1980-02-01T23:59:59.000Z

208

Data base of system-average dose rates at nuclear power plants: Final report  

SciTech Connect (OSTI)

In this work, a data base is derived of area dose rates for systems and components listed in the Energy Economic Data Base (EEDB). The data base is derived from area surveys obtained during outages at four boiling water reactors (BWRs) at three stations and eight pressurized water reactors (PWRs) at four stations. Separate tables are given for BWRs and PWRs. These tables may be combined with estimates of labor hours to provide order-of-magnitude estimates of exposure for purposes of regulatory analysis. They are only valid for work involving entire systems or components. The estimates of labor hours used in conjunction with the dose rates to estimate exposure must be adjusted to account for in-field time. Finally, the dose rates given in the data base do not reflect ALARA considerations. 11 refs., 2 figs., 3 tabs.

Beal, S.K.; Britz, W.L.; Cohen, S.C.; Goldin, A.S.; Goldin, D.J.

1987-10-01T23:59:59.000Z

209

Variability of Power from Large-Scale Solar Photovoltaic Scenarios in the State of Gujarat: Preprint  

SciTech Connect (OSTI)

India has ambitious goals for high utilization of variable renewable power from wind and solar, and deployment has been proceeding at a rapid pace. The western state of Gujarat currently has the largest amount of solar generation of any Indian state, with over 855 Megawatts direct current (MWDC). Combined with over 3,240 MW of wind, variable generation renewables comprise nearly 18% of the electric-generating capacity in the state. A new historic 10-kilometer (km) gridded solar radiation data set capturing hourly insolation values for 2002-2011 is available for India. We apply an established method for downscaling hourly irradiance data to one-minute irradiance data at potential PV power production locations for one year, 2006. The objective of this report is to characterize the intra-hour variability of existing and planned photovoltaic solar power generation in the state of Gujarat (a total of 1.9 gigawatts direct current (GWDC)), and of five possible expansion scenarios of solar generation that reflect a range of geographic diversity (each scenario totals 500-1,000 MW of additional solar capacity). The report statistically analyzes one year's worth of power variability data, applied to both the baseline and expansion scenarios, to evaluate diurnal and seasonal power fluctuations, different timescales of variability (e.g., from one to 15 minutes), the magnitude of variability (both total megawatts and relative to installed solar capacity), and the extent to which the variability can be anticipated in advance. The paper also examines how Gujarat Energy Transmission Corporation (GETCO) and the Gujarat State Load Dispatch Centre (SLDC) could make use of the solar variability profiles in grid operations and planning.

Parsons, B.; Hummon, M.; Cochran, J.; Stoltenberg, B.; Batra, P.; Mehta, B.; Patel, D.

2014-04-01T23:59:59.000Z

210

Variability of Power from Large-Scale Solar Photovoltaic Scenarios in the State of Gujarat (Presentation)  

SciTech Connect (OSTI)

India has ambitious goals for high utilization of variable renewable power from wind and solar, and deployment has been proceeding at a rapid pace. The western state of Gujarat currently has the largest amount of solar generation of any Indian state, with over 855 Megawatts direct current (MWDC). Combined with over 3,240 MW of wind, variable generation renewables comprise nearly 18% of the electric-generating capacity in the state. A new historic 10-kilometer (km) gridded solar radiation data set capturing hourly insolation values for 2002-2011 is available for India. We apply an established method for downscaling hourly irradiance data to one-minute irradiance data at potential PV power production locations for one year, 2006. The objective of this report is to characterize the intra-hour variability of existing and planned photovoltaic solar power generation in the state of Gujarat (a total of 1.9 gigawatts direct current (GWDC)), and of five possible expansion scenarios of solar generation that reflect a range of geographic diversity (each scenario totals 500-1,000 MW of additional solar capacity). The report statistically analyzes one year's worth of power variability data, applied to both the baseline and expansion scenarios, to evaluate diurnal and seasonal power fluctuations, different timescales of variability (e.g., from one to 15 minutes), the magnitude of variability (both total megawatts and relative to installed solar capacity), and the extent to which the variability can be anticipated in advance. The paper also examines how Gujarat Energy Transmission Corporation (GETCO) and the Gujarat State Load Dispatch Centre (SLDC) could make use of the solar variability profiles in grid operations and planning.

Parsons, B.; Hummon, M.; Cochran, J.; Stoltenberg, B.; Batra, P.; Mehta, B.; Patel, D.

2014-04-01T23:59:59.000Z

211

Rule Based Energy Management and Reporting System (EMRS) Applied to a Large Utility Power Station Complex  

E-Print Network [OSTI]

that result in sudden hot process water swings in a period of less than a minute. Power boilers seldom operate at steady state conditions unless they are base loaded (i.e. the boiler master is placed in ?manual?). It is this variability that makes real... Allocators for an incremental steam change. The revised header controller design integrates three distinct functions. First, the boiler constraint block defines a safe operating envelope. This envelope is defined by a prioritized combination...

Bamber, D.; Childress, R.; Robinson, J.

2004-01-01T23:59:59.000Z

212

Large power users and capacity shortages in developing countries: the role of innovative pricing  

Science Journals Connector (OSTI)

This paper addresses innovative electricity pricing as a strategy for managing electric load, offering pricing as an alternative to building generating capacity to meet electric load commitments in the developing world. Drawing upon the Western experience with pricing as a demand-side management strategy, three questions are addressed: (i) Do innovative pricing strategies alter the amount and pattern of electricity consumption for high-voltage users? (ii) What are future directions in electricity pricing for industrial users? and (iii) Are these strategies relevant for power systems in the developing world? The most widely adopted innovative pricing strategies by Western utilities are variants of time-of-use (TOU) pricing, which have generally been effective in reducing load during peak periods. More recently, technological advances have allowed utilities to experiment with aligning electricity prices more closely with actual power delivery costs. While temporal aspects of these innovative pricing strategies have general applicability as a load management strategy, the power systems in many developing countries have more urgent pricing priorities than adopting the most recent strategies of Western utilities.

Lawrence J. Hill

1991-01-01T23:59:59.000Z

213

SPARTA: Scheduled Power and Rate Adaptation Ramana Rao Kompella and Alex C. Snoeren  

E-Print Network [OSTI]

adaptive lazy scheduling (transmitting packets as slow as possible) to conserve energy while preserving & Balakrishnan] and SPARTA with varying look-ahead buffers. We assume the following IEEE-standard minimum SNR (in.995.981.59-2.92SNR 11Mb5.5Mb2Mb1MbRate Two simultaneous 802.11a FTP transfers assuming IEEE- standard minimum SNR

Kompella, Ramana Rao

214

BPA Power Services (PBL)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Rates Previous Power Rates Resource Program Average System Cost Methodology (ASCM) Wind Integration Tiered Rate Methodology Supplemental Rate Case Tiered Rate Methodology...

215

High-average-power, 100-Hz-repetition-rate, tabletop soft-x-ray lasers at sub-15-nm wavelengths  

SciTech Connect (OSTI)

Efficient excitation of dense plasma columns at 100-Hz repetition rate using a tailored pump pulse profile produced a tabletop soft-x-ray laser average power of 0.1 mW at = 13.9 nm and 20 W at = 11.9 nm from transitions of Ni-like Ag and Ni-like Sn, respectively. Lasing on several other transitions with wavelengths between 10.9 and 14.7 nm was also obtained using 0.9-J pump pulses of 5-ps duration from a compact diode-pumped chirped pulse amplification Yb:YAG laser. Hydrodynamic and atomic plasma simulations show that the pump pulse profile, consisting of a nanosecond ramp followed by two peaks of picosecond duration, creates a plasma with an increased density of Ni-like ions at the time of peak temperature that results in a larger gain coefficient over a temporally and spatially enlarged space leading to a threefold increase in the soft-x-ray laser output pulse energy. The high average power of these compact soft-x-ray lasers will enable applications requiring high photon flux. These results open the path to milliwatt-average-power tabletop soft-x-ray lasers.

Reagan, Brendon [Colorado State University, Fort Collins] [Colorado State University, Fort Collins; Berrill, Mark A [ORNL] [ORNL; Wernsing, Keith [Colorado State University, Fort Collins] [Colorado State University, Fort Collins; Baumgarten, Cory [Colorado State University, Fort Collins] [Colorado State University, Fort Collins; Woolston, Mark [Colorado State University, Fort Collins] [Colorado State University, Fort Collins; Rocca, Jorge [Colorado State University, Fort Collins] [Colorado State University, Fort Collins

2014-01-01T23:59:59.000Z

216

Monte Carlo estimation of the rates of lightning strikes on power lines  

Science Journals Connector (OSTI)

This paper reports the development of a general method for estimating the rates of lightning strikes on transmission lines using Monte Carlo simulation. Effects of towers, cross-arms, non-level ground, conductor sags and nearby structures are directly represented in the 3-dimension electrogeometric model (EGM). The method developed is a general one that is applicable to any transmission line configuration and is independent of the EGM used. Tedious analytical derivation of more than 100 equations for each configuration as required by analytical methods is avoided altogether. The formulation and a flow chart are detailed in the paper. The shortest distances from the lightning leader tip to individual structures that may be struck are evaluated and then compared with striking distances. The outcome of the comparison identifies the structure which will be struck in each simulation. The exposure area adopted in the simulation is determined on the basis of the transmission line route length and the maximum possible striking distance to ensure that the simulation results in a maximum possible number of strikes on the overhead line. Strokes outside the exposure area will always miss the transmission line and, therefore, have no effects on the results. The method proposed and its software implementation are verified on the basis of results from analytical methods of earlier work, and from field data.

Roger Holt; Tam T. Nguyen

1999-01-01T23:59:59.000Z

217

The power of event-driven analytics in Large Scale Data Processing  

ScienceCinema (OSTI)

FeedZai is a software company specialized in creating high--throughput low--latency data processing solutions. FeedZai develops a product called "FeedZai Pulse" for continuous event--driven analytics that makes application development easier for end users. It automatically calculates key performance indicators and baselines, showing how current performance differ from previous history, creating timely business intelligence updated to the second. The tool does predictive analytics and trend analysis, displaying data on real--time web--based graphics. In 2010 FeedZai won the European EBN Smart Entrepreneurship Competition, in the Digital Models category, being considered one of the "top--20 smart companies in Europe". The main objective of this seminar/workshop is to explore the topic for large--scale data processing using Complex Event Processing and, in particular, the possible uses of Pulse in the scope of the data processing needs of CERN. Pulse is available as open--source and can be licensed both for non--commercial and commercial applications. FeedZai is interested in exploring possible synergies with CERN in high--volume low--latency data processing applications. Theseminar will be structured in two sessions, the first one being aimed to expose the general scope of FeedZai's activities, and the second focused on Pulse itself: 10:00-11:00 FeedZai and Large Scale Data Processing Introduction to FeedZai FeedZai Pulse and Complex Event Processing Demonstration Use-Cases and Applications Conclusion and Q&A 11:00-11:15 Coffee break 11:15-12:30 FeedZai Pulse Under the Hood A First FeedZai Pulse Application PulseQL overview Defining KPIs and Baselines Conclusion and Q&A About the speakers Nuno Sebastio is the CEO of FeedZai. Having worked for many years for the European Space Agency (ESA), he was responsible the overall design and development of Satellite Simulation Infrastructure of the agency. Having left ESA to found FeedZai, Nuno is currently responsible for the whole operations of the company. Nuno holds an M.Eng. in Informatics Engineering for the University of Coimbra, and an MBA from the London Business School. Paulo Marques is the CTO of FeedZai, being responsible for product development. Paulo is an Assistant Professor at the University of Coimbra, in the area of Distributed Data Processing, and an Adjunct Associated Professor at Carnegie Mellon, in the US. In the past Paulo lead a large number of projects for institutions like the ESA, Microsoft Research, SciSys, Siemens, among others, being now fully dedicated to FeedZai. Paulo holds a Ph.D. in Distributed Systems from the University of Coimbra.

None

2011-04-25T23:59:59.000Z

218

Fuel consumption rate in a heat-powered unit analyzed as a function of the temperature and consumption ratio of the air  

Science Journals Connector (OSTI)

An analysis of fuel consumption for a heat-powered unit in the ... of ceramic materials is given. The heat consumption rate is analyzed as a function of ... generating the working medium, and of the consumption r...

N. A. Tyutin

2006-01-01T23:59:59.000Z

219

Large area self-powered gamma ray detector. Phase 2, Development of a source position monitor for use on industrial radiographic units  

SciTech Connect (OSTI)

The purpose of this research was to develop a large area self-powered gamma detector (LASPGD) capable of detecting the movement of sealed radiation sources into and out of industrial radiographic units and to construct a prototype source position monitor (SPM) for these units utilizing the LASPGD. Prototype isotropic and directional LASPGDs, with solid and inert gas dielectrics, were developed and extensively tested using calibrated gamma sources (i.e., Cs-137, and Co-60). The sensitivities of the isotropic detectors, with inert gas dielectrics, were found to be approximately a factor of ten greater than those measured for the solid dielectric LASPGDs. Directionally sensitive self-powered detectors were found to exhibit a forward-to-back hemispherical sensitivity ratio of approximately 2 to 1. Industrial radiographic units containing Ir-192 sources with different activities were used to test the performance of the SPM. The SPM, which utilized a gas dielectric LASPGD, performed as designed. That is, the current generated in the LASPGD was converted to a voltage, amplified and used to control the on/off state of an incandescent lamp. The incandescent lamp, which functions as the source/out warning indicator, flashes at a rate of one flash per second when the source is in use (i.e. out of its shield).

LeVert, F.E. [K.E.M.P. Corp., Knoxville, TN (United States)

1994-01-01T23:59:59.000Z

220

Large Scale Power and Running Spectral Index in New Old Inflation  

SciTech Connect (OSTI)

We have proposed a new class of inflationary scenarios in which the first stage of expansion is driven by ''old'' false vacuum inflation. This ends by nucleation of a bubble, which then further inflates. Unlike the standard slow-roll scenarios the ''clock'' ending the second inflationary phase is not a local order parameter, but rather the average value of an oscillating scalar field, which locks the system at a saddle point of the potential in a temporary inflationary state. Inflation ends when the amplitude drops below a certain critical point and liberates the system from the false vacuum state. The second stage of inflation has only about 50 e-foldings, a number which is determined entirely by the ratio of the fundamental mass scales, such as the Planck/string scale and the supersymmetry breaking scale. The density perturbations are generated due to fluctuations of moduli-dependent Yukawa couplings. In this note we explore the observable imprints in the fluctuation spectrum of generic cross-couplings in the superpotential and in the Kaehler potential. We show that in the presence of generic non-renormalizable interactions in the superpotential between the fluctuating modulus and the oscillating inflaton, the amplitude of the density perturbations is exponentially cut-off for sufficiently large wavelengths. With reasonable choices of scales and interactions, this long wavelength cutoff can occur at approximately the current horizon size. The perturbative corrections in the Kaehler potential give non-trivial potentially observable tilt and a running of the spectral index which is different from the standard inflationary models.

Dvali, G.

2003-11-07T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Doubly Fed Induction Generator in an Offshore Wind Power Plant Operated at Rated V/Hz: Preprint  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Doubly Fed Induction Generator Doubly Fed Induction Generator in an Offshore Wind Power Plant Operated at Rated V/Hz Preprint Eduard Muljadi, Mohit Singh, and Vahan Gevorgian To be presented at the IEEE Energy Conversion Congress and Exhibition Raleigh, North Carolina September 15-20, 2012 Conference Paper NREL/CP-5500-55573 June 2012 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (Alliance), a contractor of the US Government under Contract No. DE-AC36-08GO28308. Accordingly, the US Government and Alliance retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government.

222

Large Thermoelectric Power Factor in P-type Si (110)/[110] Ultra-Thin-Layers Compared to Differently Oriented Channels  

E-Print Network [OSTI]

The ability of a material to convert heat into electricity is measured by the dimensionless thermoelectric (TE1 Large Thermoelectric Power Factor in P-type Si (110)/[110] Ultra-Thin-Layers Compared the thermoelectric power factor of ultra-thin-body p-type Si layers of thicknesses from W=3nm up to 10nm. We show

223

Security, trust, and QoS in next-generation control and communication for large power systems  

Science Journals Connector (OSTI)

The present communication architecture supporting control of the electric power grid makes it difficult to use the wealth of data collected at high rates in substations, retarding their use in new applications for controlling the grid. A flexible, real-time data network would make it possible to use these data for many more control and protection applications, potentially increasing the grid's reliability and increasing its operating efficiency. Applications that could use these data include: decentralised load frequency control; closed-loop voltage control; transient and small-signal stabilisation; and special protection schemes using data gathered over a wide area. Such applications and the flexibility of the underlying communication network imply greater data sharing between utilities, leading to new performance, availability and reliability requirements. This paper examines the security, trust and Quality of Service (QoS) requirements imposed by these applications and shows how they are met by mechanisms included in the GridStat middleware framework that we are developing.

Carl H. Hauser; David E. Bakken; Ioanna Dionysiou; K. Harald Gjermundrod; Venkata S. Irava; Joel Helkey; Anjan Bose

2008-01-01T23:59:59.000Z

224

The Application of Best Estimate and Uncertainty Analysis Methodology to Large LOCA Power Pulse in a CANDU 6 Reactor  

SciTech Connect (OSTI)

The paper describes briefly a best estimate plus uncertainty analysis (BE+UA) methodology and presents its proto-typing application to the power pulse phase of a limiting large Loss-of-Coolant Accident (LOCA) for a CANDU 6 reactor fuelled with CANFLEX{sup R} fuel. The methodology is consistent with and builds on world practice. The analysis is divided into two phases to focus on the dominant parameters for each phase and to allow for the consideration of all identified highly ranked parameters in the statistical analysis and response surface fits for margin parameters. The objective of this analysis is to quantify improvements in predicted safety margins under best estimate conditions. (authors)

Abdul-Razzak, A.; Zhang, J.; Sills, H.E.; Flatt, L.; Jenkins, D.; Wallace, D.J.; Popov, N. [Atomic Energy of Canada Limited, Ontario (Canada)

2002-07-01T23:59:59.000Z

225

Insensitivity of the rate of ion motional heating to trap-electrode material over a large temperature range  

E-Print Network [OSTI]

We present measurements of trapped-ion motional-state heating rates in niobium and gold surface-electrode ion traps over a range of trap-electrode temperatures from approximately 4 K to room temperature (295 K) in a single ...

Chiaverini, John

226

Assessment of the fire resistance of a nuclear power plant subjected to a large commercial aircraft crash  

Science Journals Connector (OSTI)

The safety assessment of infrastructures, such as a nuclear power plant, for the crash of a large commercial aircraft has been performed worldwide after the terrorism that occurred in the U.S. on September 11, 2001. The assessment, however, has mainly focused on the techniques of impact analysis. In this study, a systematic procedure to assess the fire resistance of containment and auxiliary buildings subjected to such an aircraft crash is proposed. The intensity, duration and distribution of the fire are determined based on aircraft crash analyses and characteristics of jet fuel. A three-dimensional detailed finite element model of the containment and auxiliary buildings is established and used for heat transfer and thermal stress analyses, taking into account the material properties at an elevated temperature. Section forces can then be obtained that are based on a nonlinear stressstrain relationship. The fire resistance of the structure is assessed by comparing the fire-induced section forces with the section resistance which is evaluated using the loadmoment strength interaction diagram. The study addresses the problem whereby the conventional assessment that only considers the flexural behaviour is less accurate. The assessment results support the general conclusion that the nuclear power plant structures can maintain structural integrity against external fire due to their relatively thick sections. The proposed procedure can be extensively applied to evaluate the fire endurance time of any type of structure subjected to an arbitrary fire.

Se-Jin Jeon; Byeong-Moo Jin; Young-Jin Kim

2012-01-01T23:59:59.000Z

227

Measurement of natural radioactivity and radon exhalation rate in fly ash samples from a thermal power plant and estimation of radiation doses  

Science Journals Connector (OSTI)

Fly ash produced by coal-burning in thermal power station has become a subject of world wide interest in recent years because of its diverse uses in construction activities and considerable economic and environmental importance. Fly ash is used in the production of bricks, sheets, cement and also in land filling etc. Indian coals used in thermal power plants are found to have high ash contents, resulting in the production of large amount of fly ash. Coal contains radionuclides including uranium (the source of inert gas radon), Th and K. Thus coal combustion results in enhanced concentration of natural radionuclides 226Ra, 232Th and 40K. Since these radionuclides concentration in fly ash plays an important role in health physics it is important to measure radionuclides concentration in fly ash. In the present work enhanced radioactivity and radon exhalation rate from fly ash samples collected from a thermal power plant of NTPC (National Thermal Power Corporation), Dadri (U.P.) India, have been measured. A high resolution gamma ray spectroscopic system has been used for the measurement of natural radioactivity (226Ra, 232Th and 40K). Gamma spectrometric measurements were carried out at Inter-University Accelerator Centre, New Delhi using a coaxial n-type \\{HPGe\\} detector (EG&G, ORTEC, Oak Ridge, USA). Activity concentration of 226Ra varies from 81.82.2 to 177.310.0Bqkg?1 with an average value of 118.67.4Bqkg?1 and of 232Th from 111.63.2 to 178.53.9Bqkg?1 with an average value of 147.03.4Bqkg?1. 40K activity was found to be below detection limit in some samples while other samples have shown potassium activity to vary from 365.94.8 to 495.96.2Bqkg?1 with an average value of 352.04.5Bqkg?1. Surface radon exhalation rates (EA) and Mass exhalation rates (EM) in these samples were measured by Sealed can technique using LR-115 type II track detectors. EA is found to vary from 80.19.3 to 242.716.3mBqm?2h?1 with an average value 155.512.8mBqm?2h?1, while EM varies from 3.10.4 to 9.30.6mBqkg?1h?1 with an average value of 6.00.5mBqkg?1h?1. Radium equivalent activity (Raeq), related to the external gamma dose and internal dose due to radon and its daughters range from 283.2 to 422.4Bqkg?1 with an average value of 353.9Bqkg?1. The calculated values of external hazard index (Hex) vary from 0.77 to 1.87 with an average value of 1.03. Most of the samples show the value of Raeq close to the allowed upper limit of 370Bqkg?1 and Hex close to unity respectively except in two samples. Annual effective dose varies from 0.15 to 0.23mSvy?1 with an average value 0.19mSvy?1.

Mamta Gupta; Ajay Kumar Mahur; Rati Varshney; R.G. Sonkawade; K.D. Verma; Rajendra Prasad

2013-01-01T23:59:59.000Z

228

Survival rates of fishes and macroinvertebrates impinged on the vertically revolving intake screens of a power plant on Galveston Bay, Texas  

E-Print Network [OSTI]

for cooling purposes will continue to increase. The number of aquatic organ- isms impinged or entrained at cooling water intakes will tend to increase accordingly. In recent years environmental studies of power plants have shifted emphasis from effects..., and by asphyxiation due to removal from water for excessively long periods (U. S. Environmental Protection Agency 1973). Recent field studies have enumerated the species of fish impinged at various power plants, but few have actually determined survival rates...

Chase, David Mayo

2012-06-07T23:59:59.000Z

229

A survey on energy storage resources configurations in order to propose an optimum configuration for smoothing fluctuations of future large wind power plants  

Science Journals Connector (OSTI)

Abstract As the wind power capacity increases, the effect of wind power fluctuations on the system stability becomes more significant. Despite its high costs, utilizing energy storage resources such as batteries is inevitable in the smoothing process of wind power fluctuations. In a wind power plant, the place where batteries are located has considerable direct effect on their required capacity and thus on the initial investment cost. Therefore, in this paper a suitable configuration which significantly reduces the batteries investment cost is proposed and then the wind power fluctuation of a large wind power plant connected to a smart distribution grid is smoothed. Additionally, existing configurations for installing batteries in large wind power plants are investigated. The proposed configuration utilizes smart parks as aggregated storage resources in load side and an aggregated battery energy storage system with limited capacity in plant side as well. Therefore, in addition to accurate smoothing of wind power fluctuations, the energy storage investment cost is reduced significantly utilizing the proposed configuration. Simulation studies in MATLAB software package are carried out to verify the performance of the proposed approach.

M. Jannati; S.H. Hosseinian; B. Vahidi; Guo-Jie Li

2014-01-01T23:59:59.000Z

230

The air dose rate around the Fukushima Dai-ichi Nuclear Power Plant: its spatial characteristics and temporal changes until December 2012  

Science Journals Connector (OSTI)

Abstract Distribution maps of air dose rates around the Fukushima Dai-ichi Nuclear Power Plant were constructed using the results of measurement obtained from approximately 6500 locations (at most) per measurement period. The measurements were conducted 1m above the ground using survey meters in flat and spatially open locations. Spatial distribution and temporal change of the air dose rate in the area were revealed by examining the resultant distribution maps. The observed reduction rate of the air dose rate over the 18 months between June 2011 and December 2012 was greater than that calculated from radioactive decay of radiocesium by 10% in relative percentage except decontaminated sites. This 10% difference in the reduction of the air dose rate can be explained by the mobility of radiocesium in the depth direction. In the region where the air dose rate was lower than 0.25?Svh?1 on June 2011, the reduction of the air dose rate was observed to be smaller than that of the other dose rate regions, and it was in fact smaller than the reduction rate caused by radioactive decay alone. In contrast, the reduction rate was larger in regions with higher air dose rates. In flat and spatially open locations, no significant difference in the reduction tendency of air dose rates was observed among different land use classifications (rice fields, farmland, forests, and building sites).

Satoshi Mikami; Takeshi Maeyama; Yoshifumi Hoshide; Ryuichi Sakamoto; Shoji Sato; Naotoshi Okuda; Tetsuro Sato; Hiroshi Takemiya; Kimiaki Saito

2014-01-01T23:59:59.000Z

231

Large-Eddy Simulation Study of Wake Propagation and Power Production in an Array of Tidal-Current Turbines: Preprint  

SciTech Connect (OSTI)

This paper presents our initial work in performing large-eddy simulations of tidal turbine array flows. First, a horizontally-periodic precursor simulation is performed to create turbulent flow data. Then that data is used to determine the inflow into a tidal turbine array two rows deep and infinitely wide. The turbines are modeled using rotating actuator lines, and the finite-volume method is used to solve the governing equations. In studying the wakes created by the turbines, we observed that the vertical shear of the inflow combined with wake rotation causes lateral wake asymmetry. Also, various turbine configurations are simulated, and the total power production relative to isolated turbines is examined. Staggering consecutive rows of turbines in the simulated configurations allows the greatest efficiency using the least downstream row spacing. Counter-rotating consecutive downstream turbines in a non-staggered array shows a small benefit. This work has identified areas for improvement, such as the use of a larger precursor domain to better capture elongated turbulent structures, the inclusion of salinity and temperature equations to account for density stratification and its effect on turbulence, improved wall shear stress modeling, and the examination of more array configurations.

Churchfield, M. J.; Li, Y.; Moriarty, P. J.

2011-07-01T23:59:59.000Z

232

Large-Eddy Simulation Study of Wake Propagation and Power Production in an Array of Tidal-Current Turbines: Preprint  

SciTech Connect (OSTI)

This paper presents our initial work in performing large-eddy simulations of tidal turbine array flows. First, a horizontally-periodic precursor simulation is performed to create turbulent flow data. Then that data is used as inflow into a tidal turbine array two rows deep and infinitely wide. The turbines are modeled using rotating actuator lines, and the finite-volume method is used to solve the governing equations. In studying the wakes created by the turbines, we observed that the vertical shear of the inflow combined with wake rotation causes lateral wake asymmetry. Also, various turbine configurations are simulated, and the total power production relative to isolated turbines is examined. Staggering consecutive rows of turbines in the simulated configurations allows the greatest efficiency using the least downstream row spacing. Counter-rotating consecutive downstream turbines in a non-staggered array shows a small benefit. This work has identified areas for improvement, such as the use of a larger precursor domain to better capture elongated turbulent structures, the inclusion of salinity and temperature equations to account for density stratification and its effect on turbulence, improved wall shear stress modelling, and the examination of more array configurations.

Churchfield, M. J.; Li, Y.; Moriarty, P. J.

2012-07-01T23:59:59.000Z

233

Dartmouth College Computer Science Technical Report TR2010-668 Creating Large Disturbances in the Power Grid  

E-Print Network [OSTI]

in the Power Grid: Methods of Attack After Cyber Infiltration Senior Honors Thesis June 2010 Loren Sands are pursuing methods of securing the cyber aspect of the U.S. power grid, one of the country's most critical attacks. In this paper I discuss the physical and cyber systems that compose the power grid, and I explore

234

7-29 A coal-burning power plant produces 300 MW of power. The amount of coal consumed during a one-day period and the rate of air flowing through the furnace are to be determined.  

E-Print Network [OSTI]

7-11 7-29 A coal-burning power plant produces 300 MW of power. The amount of coal consumed during The heating value of the coal is given to be 28,000 kJ/kg. Analysis (a) The rate and the amount of heat inputs'tQQ The amount and rate of coal consumed during this period are kg/s48.33 s360024 kg10893.2 MJ/kg28 MJ101.8 6

Bahrami, Majid

235

Rates - WAPA-137 Rate Order  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WAPA-137 Rate Order WAPA-137 Rate Order 2009 CRSP Management Center Customer Rates Second Step Presentation from the June 25, 2009, Customer Meeting Handout Materials from the June 25, 2009, Customer Meeting Customer Comment Letters ATEA CREDA Farmington ITCA AMPUA Rate Adjustment Information The second step of WAPA-137 SLCA/IP Firm Power, CRSP Transmission and Ancillary Services rate adjustment. FERC Approval of Rate Order No. WAPA-137 Notice Of Filing for Rate Order No. WAPA-137 Published Final FRN for Rate Order No. WAPA-137 Letter to Customers regarding the published Notice of Extension of Public Process for Rate Order No. WAPA-137 Published Extension of Public Process for Rate Order No. WAPA-137 FRN Follow-up Public Information and Comment Forum Flier WAPA-137 Customer Meetings and Rate Adjustment Schedule

236

Spatial distribution of average charge state and deposition rate in high power impulse magnetron sputtering of copper  

E-Print Network [OSTI]

was inch (6. 25 mm) thick copper disk. The diameter of thevery high power de nsity. Copper was selected for this studythe high stability of HIPIMS copper discharges ( copper can

Horwat, David

2008-01-01T23:59:59.000Z

237

Nonuniversal power law of the Hall scattering rate in a single-layer cuprate Bi2Sr2-xLaxCuO6  

Science Journals Connector (OSTI)

In-plane resistivity, Hall coefficient, and magnetoresistance are measured in a series of high-quality Bi2Sr2-xLaxCuO6 crystals with various carrier concentrations, from underdoped to overdoped. It is found that the temperature dependence of the cotangent of the Hall angle obeys a power law T? with ? systematically decreasing with increasing carriers. While the observed power-law behavior supports the scattering-time separation, the universality of the Fermi-liquid-like T2 dependence of the Hall scattering rate is seriously questioned.

Yoichi Ando and T. Murayama

1999-09-01T23:59:59.000Z

238

CFD modelling of air-fired and oxy-fuel combustion in a large-scale furnace at Loy Yang A brown coal power station  

Science Journals Connector (OSTI)

Oxy-fuel combustion technique is a viable option to reduce several types of greenhouse gases (GHGs) emissions from the pulverized coal (PC) combustion systems. In this paper, a computational fluid dynamics (CFD) modelling study has been developed in order to investigate the Victorian brown coal combustion in a 550MW utility boiler under the air-fired (reference case) and three oxy-fuel-fired scenarios. The reference firing case was modelled based on the operating conditions of Loy Yang A power plant located in the state of Victoria, Australia. While Chalmers oxy-fuel combustion approach was selected for the present oxy-fuel combustion simulations, which referred to as OF25 (25vol.% O2), OF27 (27vol.% O2), and OF29 (29vol.% O2). User-defined functions (UDFs) were written and incorporated into the CFD code to calculate the following mathematical models: the PC devolatilization, char burnout, multi-step chemical reactions, mass and heat transfer, carbon in fly-ash, and \\{NOx\\} formation/destruction. A level of confidence of the CFD model was achieved validating four different parameters of the conventional combustion case, as well as the previous preliminary CFD studies that conducted on a 100kW unit firing propane and lignite under oxy-fuel combustion environments. The numerical results of OF29 combustion condition were considerably similar to the reference firing results in terms of gas temperature levels and radiative heat transfer relative to the OF25 and OF27 combustion cases. This similarity was due to increasing the residence time of PC in the combustion zone and O2-enriched in feed oxidizer gases. A significant increase in the CO2 concentrations and a noticeable decrease in the \\{NOx\\} formation were observed under all oxy-fuel combustion scenarios. The combustion chemistry was adopted in these investigations in order to capture the effects of O2 concentrations and gas temperatures on the CO/CO2 production rate and equilibrium between H2 and H2O in the combustion zone. Also, the use of O2-enriched atmospheres during oxy-fuel-fired cases was slightly enhanced the carbon burnout rate. These predicted results were reasonably consistent with the experimental investigations and numerical modelling found in the literature. This study of Victorian brown coal oxy-fuel combustion in a large-scale tangentially-fired boiler is important prior to its implementation in real-life.

Audai Hussein Al-Abbas; Jamal Naser; David Dodds

2012-01-01T23:59:59.000Z

239

Microsoft PowerPoint - srnl_24x36vert Nov2010 EM tech exchange melt rate model choi.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enhancement of DWPF Melt Rate Model (WP 4.2.3) Enhancement of DWPF Melt Rate Model (WP 4.2.3) A.S. Choi, D. H. Miller, Engineering Process Development D. M. Immel, Imaging and Radiation Systems Free energy output is re-arranged into various functional groups based on literature data on aluminoborosilicate glass structural units Methodology: Objective: Develop a predictive tool for the impact of feed chemistry on relative melt rate of HLW glasses. Input Semi-empirical 4-Stage DWPF Cold Cap Model Output Phase Equilibria & Speciation of Melt, Intermediate Condensed Phases, Calcine Gases and Their Free Energies Feed Chemistry NIST Free Energy Database for Complex Liquids Melt Rate Furnace (MRF) Experiments Derive an empirical correlation of relative melt rates using free energy functional groups. X-Ray Imaging &

240

Solar Power in the Desert: Are the current large-scale solar developments really improving Californias environment?  

E-Print Network [OSTI]

large scale solar developments in California will impactpoorly placed solar arrays in California leads to the losslarge-scale solar developments really improving Californias

Allen, Michael F.; McHughen, Alan

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The effect of oxygen flow rate and radio frequency plasma power on cubic ZnMgO ultraviolet sensors grown by plasma-enhanced molecular beam epitaxy  

SciTech Connect (OSTI)

Cubic Zn{sub 1-x}Mg{sub x}O thin films were produced by Plasma-Enhanced Molecular Beam Epitaxy. Oxygen flow rate and applied Radio-Frequency (RF) plasma power were varied to investigate the impact on film growth and optoelectronic device performance. Solar-blind and visible-blind detectors were fabricated with metal-semiconductor-metal interdigitated Ni/Mg/Au contacts and responsivity is compared under different growth conditions. Increasing oxygen flow rate and RF plasma power increased Zn incorporation in the film, which leads to phase segregation at relatively high Zn/Mg ratio. Responsivity as high as 61 A/W was measured in phase-segregated ZnMgO visible-blind detectors.

Casey Boutwell, R.; Wei Ming; Schoenfeld, Winston V. [CREOL, College of Optics and Photonics, University of Central Florida, Orlando, Florida 32816-2700 (United States)

2013-07-15T23:59:59.000Z

242

7-46E The COP and the refrigeration rate of an ice machine are given. The power consumption is to be determined.  

E-Print Network [OSTI]

25°F Analysis The cooling load of this ice machine is #12; #12; Btu/h4732Btu/lbm169lbm/h28LL qm7-15 7-46E The COP and the refrigeration rate of an ice machine are given. The power consumption is to be determined. Assumptions The ice machine operates steadily. Ice Machine Outdoors R COP = 2.4 QL water 55°F ice

Bahrami, Majid

243

Determination of Thermal-Degradation Rates of Some Candidate Rankine-Cycle Organic Working Fluids for Conversion of Industrial Waste Heat Into Power  

E-Print Network [OSTI]

DETERMINATION OF THERMAL-DEGRADATION RATES OF SOME CANDIDATE RANKINE-CYCLE ORGANIC WORKING FLUIDS FOR CONVERSION OF INDUSTRIAL WASTE HEAT INTO POWER Mohan L. Jain, Jack Demirgian, John L. Krazinski, and H. Bushby Argonne National Laboratory..., Argonne, Illinois Howard Mattes and John Purcell U.S. Department of Energy ABSTRACT Serious concerns over the long-term thermal In a previous study [1] based on systems stability of organic working fluids and its effect analysis and covering...

Jain, M. L.; Demirgian, J.; Krazinski, J. L.; Bushby, H.; Mattes, H.; Purcell, J.

1984-01-01T23:59:59.000Z

244

Optimization of automation: I. Estimation method of cognitive automation rates reflecting the effects of automation on human operators in nuclear power plants  

Science Journals Connector (OSTI)

Abstract Since automation was introduced in various industrial fields, the concept of the automation rate has been used to indicate the inclusion proportion of automation among all work processes or facilities. Expressions of the inclusion proportion of automation are predictable, as is the ability to express the degree of the enhancement of human performance. However, many researchers have found that a high automation rate does not guarantee high performance. Therefore, to reflect the effects of automation on human performance, this paper proposes a new estimation method of the automation rate that considers the effects of automation on human operators in nuclear power plants (NPPs). Automation in \\{NPPs\\} can be divided into two types: system automation and cognitive automation. Some general descriptions and characteristics of each type of automation are provided, and the advantages of automation are investigated. The advantages of each type of automation are used as measures of the estimation method of the automation rate. One advantage was found to be a reduction in the number of tasks, and another was a reduction in human cognitive task loads. The system and the cognitive automation rate were proposed as quantitative measures by taking advantage of the aforementioned benefits. To quantify the required human cognitive task loads and thus suggest the cognitive automation rate, Conants information-theory-based model was applied. The validity of the suggested method, especially as regards the cognitive automation rate, was proven by conducting experiments. The result showed that a decreased rate of the operator working time was significantly related to the cognitive automation rate and that the calculation of the cognitive task load was useful as a measure of the cognitive automation rate.

Seung Min Lee; Jong Hyun Kim; Poong Hyun Seong

2014-01-01T23:59:59.000Z

245

Influence of a Modification of the Petcoke/Coal Ratio on the Leachability of Fly Ash and Slag Produced from a Large PCC Power Plant  

Science Journals Connector (OSTI)

Influence of a Modification of the Petcoke/Coal Ratio on the Leachability of Fly Ash and Slag Produced from a Large PCC Power Plant ... This study is focused on identifying the changes in the environmental quality of co-fired fly ash and slag induced by a modification of the petcoke/coal ratio. ... Petcoke was found to increase the leachable content of V and Mo and to enhance the mobility of S and As. ...

Maria Izquierdo; Oriol Font; Natalia Moreno; Xavier Querol; Frank E. Huggins; Esther Alvarez; Sergi Diez; Pedro Otero; Juan Carlos Ballesteros; Antonio Gimenez

2007-06-28T23:59:59.000Z

246

Shake Table Test on the 1:30 Model Structure of a Large Cooling Tower for Fire Power Plant  

Science Journals Connector (OSTI)

For understanding the seismic behaviour of extra-large scale cooling tower with dimension of 220 meters high and 188 meters in diameter, the shake table tests for its 1:30 (length ratio) tower model were carr...

J. W. Dai; X. R. Weng; Y. Hu

2014-01-01T23:59:59.000Z

247

Definition: Dynamic Capability Rating System | Open Energy Information  

Open Energy Info (EERE)

Capability Rating System Capability Rating System Jump to: navigation, search Dictionary.png Dynamic Capability Rating System Dynamic capability rating adjusts the thermal rating of power equipment based on factors such as air temperature, wind speed, and solar radiation to reflect actual operating conditions. These systems are primarily used on high capacity or critical power system elements such as transmission lines and large power transformers.[1] Related Terms transmission lines, Dynamic capability rating, thermal rating, power, solar radiation, rating, transmission line, transformer References ↑ https://www.smartgrid.gov/category/technology/dynamic_capability_rating_system [[Category LikeLike UnlikeLike You like this.Sign Up to see what your friends like. : Smart Grid Definitions|Template:BASEPAGENAME]]

248

Wind tunnel simulation of exhaust recirculation in an air-cooling system at a large power plant  

Science Journals Connector (OSTI)

The recirculation of hot exhaust air and its dependence on wind direction was investigated as a cause of reduced efficiency in an air-cooled condenser (ACC). A method of simulating exhaust air recirculation at an ACC platform using a wind tunnel is presented, and applied to a proposed ACC addition at an existing power plant. It was found that wind speed and the height of an ACC platform have a significant impact on recirculation. Wind direction was also found to be significant, due to the interference of the buildings adjacent to the ACC platform. The mechanisms that cause recirculation are presented and analyzed, and the characteristics of the recirculating flow are described. It was found that when considering additions to existing power plants, the distance of the new ACC and power plant from the original buildings and structures has only a minor effect on the recirculation of the added ACC platform. Wind tunnel simulation is recommended in the initial design stage of new or renovated power plants with ACC systems to minimize exhaust recirculation.

Zhifu Gu; Xuerei Chen; William Lubitz; Yan Li; Wenlin Luo

2007-01-01T23:59:59.000Z

249

High Plains Power Inc | Open Energy Information  

Open Energy Info (EERE)

High Plains Power Inc High Plains Power Inc Place Wyoming Utility Id 8566 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png IRRIGATION Industrial LARGE POWER 500kW OR GREATER TIME OF USE Industrial LARGE POWER DISTRIBUTION SUBSTATION GREATER THAN 500kW LEVEL SERVICE Industrial LARGE POWER DISTRIBUTION SUBSTATION LESS THAN 500kW LEVEL SERVICE Industrial LARGE POWER THREE PHASE DISTRIBUTION PRIMARY LEVEL SERVICE Industrial LARGE POWER THREE PHASE DISTRIBUTION PRIMARY LEVEL SERVICE V2 Industrial

250

Rate schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

251

A large-eddy simulation study of wake propagation and power production in an array of tidal-current turbines  

Science Journals Connector (OSTI)

...production in an array of tidal-current turbines Matthew J. Churchfield Ye Li Patrick...performing large-eddy simulations of tidal turbine array flows. First, a horizontally periodic...those data are used as inflow into a tidal turbine array two rows deep and infinitely wide...

2013-01-01T23:59:59.000Z

252

Assessment of generic solar thermal systems for large power applications: analysis of electric power generating costs for systems larger than 10 MWe  

SciTech Connect (OSTI)

Seven generic types of collectors, together with associated subsystems for electric power generation, were considered. The collectors can be classified into three categories: (1) two-axis tracking (with compound-curvature reflecting surfaces); (2) one-axis tracking (with single-curvature reflecting surfaces); and (3) nontracking (with low-concentration reflecting surfaces). All seven collectors were analyzed in conceptual system configurations with Rankine-cycle engines. In addition, two of the collectors were analyzed with Brayton-cycle engines, and one was analyzed with a Stirling-cycle engine. With these engine options, and the consideration of both thermal and electrical storage for the Brayton-cycle central receiver, 11 systems were formulated for analysis. Conceptual designs developed for the 11 systems were based on common assumptions of available technology in the 1990 to 2000 time frame. No attempt was made to perform a detailed optimization of each conceptual design. Rather, designs best suited for a comparative evaluation of the concepts were formulated. Costs were estimated on the basis of identical assumptions, ground rules, methodologies, and unit costs of materials and labor applied uniformly to all of the concepts. The computer code SOLSTEP was used to analyze the thermodynamic performance characteristics and energy costs of the 11 concepts. Year-long simulations were performed using meteorological and insolation data for Barstow, California. Results for each concept include levelized energy costs and capacity factors for various combinations of storage capacity and collector field size.

Apley, W.J.; Bird, S.P.; Brown, D.R.; Drost, M.K.; Fort, J.A.; Garrett-Price, B.A.; Patton, W.P.; Williams, T.A.

1980-11-01T23:59:59.000Z

253

Ensuring Productive Resolution by the Junction-Resolving Enzyme RuvC: Large Enhancement of the Second-Strand Cleavage Rate  

Science Journals Connector (OSTI)

Table 1:? Rates of Cleavage of Synthetic DNA Junctions by RuvCa ... Table 2:? Rates of Cleavage by RuvC of Synthetic DNA Junctions Containing Oligoadenine Bulges at the Point of Strand Exchangea ...

Jonathan M. Fogg; David M. J. Lilley

2000-12-01T23:59:59.000Z

254

A Large-Eddy Simulation Study of Wake Propagation and Power Production in an Array of Tidal-Current Turbines: Preprint  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large-Eddy Simulation Study Large-Eddy Simulation Study of Wake Propagation and Power Production in an Array of Tidal- Current Turbines Preprint M.J. Churchfield, Y. Li, and P.J. Moriarty To be presented at the 9 th European Wave and Tidal Energy Conference 2011 Southhampton, England September 4 - 9, 2011 Conference Paper NREL/CP-5000-51765 July 2011 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (Alliance), a contractor of the US Government under Contract No. DE-AC36-08GO28308. Accordingly, the US Government and Alliance retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government.

255

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rate Schedules Skip Navigation Links Excess Energy Hydro Peaking Power Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative (Rayburn) Hydro Power and Energy Sold to...

256

2025 Power Marketing Initiative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Allocations Rates 2025 Power Marketing Initiative The Loveland Area Projects (LAP) Firm Electric Service (FES) contracts expire September 30, 2024. Western Area Power...

257

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 8, NO. 1, FEBRUARY 1993, PP. 1 8. POINT OF COLLAPSE AND CONTINUATION METHODS FOR LARGE  

E-Print Network [OSTI]

HVDC transmission, area interchange power control, regulating transformers, and voltage and reactive

Cañizares, Claudio A.

258

Upper Great Plains Rates information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rates and Repayment Services Rates and Repayment Services Rates 2010 Firm Power Rate (effective January 1, 2010) Rate Adjustments 2010 Firm Power Rate Adjustment 2009 Firm Power Rate Adjustment IS Rate Adjustments Rate Adjustment Process Rate Orders Signed, December 23, 2009 (16kb pdf) Announcements Firm Electric Service Customer Letter - Preliminary Review of Drought Adder Component, June 27, 2013 (74kb pdf) Customer Letter - Final Notice of Drought Adder Component, October 2, 2013 (68kb pdf) Integrated System (IS) Rates 2014 IS Rates Customer Information Meeting Presentation, October 15, 2013 (611kb pdf) Customer Letter - Notification of 2014 Rates, September 13, 2013 (160kb pdf) 2014 Transmission and Ancillary Services Rate Calculation and 2012 Rate True-up Calculation (4.9mb pdf) 2013 IS Rates

259

Design and Research on Co-simulation Training System of Large-Scale Power Grid with Distribution Network Based on Intelligent Materials System  

Science Journals Connector (OSTI)

The power system training simulation software, exist in the market, ... flow calculation without the local details or equipment operation, or focus on one or two substations, but ignoring the power of the substat...

BaiShan Mei; XiPing Zhang; Jie Xu

2011-01-01T23:59:59.000Z

260

Southwestern Electric Power Co (Louisiana) | Open Energy Information  

Open Energy Info (EERE)

Southwestern Electric Power Co Southwestern Electric Power Co Place Louisiana Utility Id 17698 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Electric Sign Service Applicable Commercial General Lighting and Power Service Commercial General Service Commercial General Service Commercial Large General Power Service - Off Peak Commercial Large Lighting and Power Service Commercial Lighting and Power Service - Primary Service Commercial Lighting and Power Service - Secondary Service Commercial Lighting and Power Service Time of Day Industrial Lighting and Power Service Time of Day - Primary Service Industrial ML-1 - Closed Offerings - 1000 Candle Power Incandescent Lighting

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

The combustion of large particles of char in bubbling fluidized beds: The dependence of Sherwood number and the rate of burning on particle diameter  

SciTech Connect (OSTI)

Particles of char derived from a variety of fuels (e.g., biomass, sewage sludge, coal, or graphite), with diameters in excess of {approx}1.5mm, burn in fluidized bed combustors containing smaller particles of, e.g., sand, such that the rate is controlled by the diffusion both of O{sub 2} to the burning solid and of the products CO and CO{sub 2} away from it into the particulate phase. It is therefore important to characterize these mass transfer processes accurately. Measurements of the burning rate of char particles made from sewage sludge suggest that the Sherwood number, Sh, increases linearly with the diameter of the fuel particle, d{sub char} (for d{sub char}>{approx}1.5mm). This linear dependence of Sh on d{sub char} is expected from the basic equation Sh=2{epsilon}{sub mf}(1+d{sub char}/2{delta}{sub diff})/{tau}, provided the thickness of the boundary layer for mass transfer, {delta}{sub diff}, is constant in the region of interest (d{sub char}>{approx}1.5mm). Such a dependence is not seen in the empirical equations currently used and based on the Frossling expression. It is found here that for chars made from sewage sludge (for d{sub char}>{approx}1.5mm), the thickness of the boundary layer for mass transfer in a fluidized bed, {delta}{sub diff}, is less than that predicted by empirical correlations based on the Frossling expression. In fact, {delta}{sub diff} is not more than the diameter of the fluidized sand particles. Finally, the experiments in this study indicate that models based on surface renewal theory should be rejected for a fluidized bed, because they give unrealistically short contact times for packets of fluidized particles at the surface of a burning sphere. The result is the new correlation Sh = 2{epsilon}{sub mf}/{tau} + (A{sub cush}/A{sub char})(d{sub char}/ {delta}{sub diff}) for the dependence of Sh on d{sub char}, the diameter of a burning char particle. This equation is based on there being a gas-cushion of fluidizing gas underneath a burning char particle; the implication of this correlation is that a completely new picture emerges for the combustion of a char particle in a hot fluidized bed. (author)

Dennis, J.S.; Hayhurst, A.N.; Scott, S.A. [University of Cambridge, Department of Chemical Engineering, Pembroke Street, Cambridge CB2 3RA, England (United Kingdom)

2006-11-15T23:59:59.000Z

262

Effective Rate Period  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fiscal Year 2014 Fiscal Year 2014 Effective Rate Period As of Beginning of the FY 10/01/2013 - 09/30/2014 Mid-Year Changes (if applicable) 10/01/2013 - 09/30/2014 Power Rates Annual Revenue Requirement Rate Schedule Power Revenue Requirement $73,441,557 CV-F13 Base Resource Revenue Requirement $69,585,875 First Preference Revenue Requirement $3,855,682

263

Power Scheduling for Multi-Hop Wireless Networks  

E-Print Network [OSTI]

Maximization of Sum Rate under Power Constraint and DPC (5.1.3 Minimization of Power under Rate Constraint (Maximization of Sum Rate under Power Constraint and ZFDPC (

Yu, Yuan

2009-01-01T23:59:59.000Z

264

7, 29612989, 2007 Predicting arene rate  

E-Print Network [OSTI]

software or computing power. Measured gas-phase rate coefficients for the reaction of aromatic hydrocarbons

Boyer, Edmond

265

A Citation-Based Assessment Of The Performance Of U.S. Boiling Water Reactors Following Extended Power Up-Rates.  

E-Print Network [OSTI]

??Nuclear power plants produce 20 percent of the electricity generated in the U.S. Nuclear generated electricity is increasingly valuable to a utility because it can (more)

Heidrich, Brenden

2012-01-01T23:59:59.000Z

266

BONNEVILLE POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Conservation Rate Credit (CRC) - A current funding mechanism that provides a discounted power rate to participating utilities, conditioned on documented expenditures on qualifying...

267

Development of a RELAP5-3D three-dimensional model of a VVER-1000 Nuclear Power Plant for analysis of a large-break loss-of-coolant accident  

E-Print Network [OSTI]

large-break loss-of-coolant accident (LB LOCA). A validated, one-dimensional control of the nuclear power plant, for the study of the effects of mixed oxide (MOX) fuel, was modified to include a standard fuel loading of UO?. The development...

Clarno, Kevin Taylor

2012-06-07T23:59:59.000Z

268

How to Prepare a PowerPoint Slide for Large-format Poster Printing 1. To create a poster slide, create a new slide (with nothing on it), then go to File/Page Setup.  

E-Print Network [OSTI]

How to Prepare a PowerPoint Slide for Large-format Poster Printing 1. To create a poster slide, create a new slide (with nothing on it), then go to File/Page Setup. Select "Slide sized for: Custom from other slides, or from other applications. DO NOT import or link data to this poster slide from

Stuart, Josh

269

detonation rate  

Science Journals Connector (OSTI)

detonation rate, detonation velocity, velocity of detonation, V.O.D., detonating velocity, rate of detonation, detonating rate ? Detonationsgeschwindigkeit f

2014-08-01T23:59:59.000Z

270

Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

271

Metlakatla Power & Light | Open Energy Information  

Open Energy Info (EERE)

Metlakatla Power & Light Metlakatla Power & Light Jump to: navigation, search Name Metlakatla Power & Light Place Alaska Utility Id 12385 Utility Location Yes Ownership M NERC Location AK Operates Generating Plant Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Rate Commercial Public Building Rate Commercial Residential Residential Seasonal Boats Commercial Small Commercial Rate Commercial Street Lights Lighting Average Rates Residential: $0.0895/kWh Commercial: $0.1150/kWh Industrial: $0.1960/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

272

Norris Public Power District | Open Energy Information  

Open Energy Info (EERE)

Norris Public Power District Norris Public Power District Place Nebraska Utility Id 13664 Utility Location Yes Ownership P NERC Location MRO Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png IRRIGATION SERVICE: RATE 10 - FULL SERVICE Commercial IRRIGATION SERVICE: RATE 12 - STANDBY Commercial IRRIGATION SERVICE: RATE 13 - ANYTIME INTERRUPTIBLE Commercial IRRIGATION SERVICE: RATE 14 - THREE DAYS ON/FOUR DAY INTERRUPTIBLE Commercial SCHEDULE 1 - FARM AND RURAL RESIDENTIAL Residential SCHEDULE 15 - LARGE POWER - BETWEEN 2,500 - 7,500 kW Industrial

273

226Ra, 232Th and 40K radionuclides enhancement rate and dose assessment for residues of lignite-fired thermal power plants in Turkey  

Science Journals Connector (OSTI)

......found in residues resulting from coal combustion in thermal power plants can widely depend on mineral ingredients of coal. Coal and ash activity concentrations...Radium 7440-29-1 Thorium | Coal Ash chemistry Environmental Exposure analysis......

A. Parmaksiz; P. Arikan; M. Vural; E. Yeltepe; I. Tkenmez

2011-11-01T23:59:59.000Z

274

Nuclear power can reduce emissions and maintain a strong economy: Rating Australias optimal future electricity-generation mix by technologies and policies  

Science Journals Connector (OSTI)

Abstract Legal barriers currently prohibit nuclear power for electricity generation in Australia. For this reason, published future electricity scenarios aimed at policy makers for this country have not seriously considered a full mix of energy options. Here we addressed this deficiency by comparing the life-cycle sustainability of published scenarios using multi-criteria decision-making analysis, and modeling the optimized future electricity mix using a genetic algorithm. The published CSIRO e-future scenario under its default condition (excluding nuclear) has the largest aggregate negative environmental and economic outcomes (score=4.51 out of 8), followed by the Australian Energy Market Operators 100% renewable energy scenario (4.16) and the Greenpeace scenario (3.97). The e-future projection with maximum nuclear-power penetration allowed yields the lowest negative impacts (1.46). After modeling possible future electricity mixes including or excluding nuclear power, the weighted criteria recommended an optimized scenario mix where nuclear power generated >40% of total electricity. The life-cycle greenhouse-gas emissions of the optimization scenarios including nuclear power were nuclear power is an effective and logical option for the environmental and economic sustainability of a future electricity network in Australia.

Sanghyun Hong; Corey J.A. Bradshaw; Barry W. Brook

2014-01-01T23:59:59.000Z

275

Nuclear-energy complexes and the economic and ecological problems of nuclear power development  

Science Journals Connector (OSTI)

In the long term, serious economic and ecological problems may arise if the required scale and rate of growth of power production is to be ensured while retaining the principle of dispersed location of ever large...

N. A. Dollezhal'; V. N. Bobolovich; I. Ya. Emel'yanov; A. I. Churin

1977-11-01T23:59:59.000Z

276

Large-dimension, high-ZT Thermoelectric Nanocomposites for High-Power High-efficiency Waste Heat Recovery for Electricity Generation  

Broader source: Energy.gov [DOE]

Large-dimension, high-ZT BiTe and Pb-based nanocomposites produced with a low-cost scalable process were used for development and testing of TE module prototypes, and demonstration of a waste heat recovery system

277

Rate Adjustments and Public Involvement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rate Adjustments and Public Involvement Documents Rate Adjustments and Public Involvement Documents CRSP Transmission 9/16/2013 WAPA-161 FRN, CRSP transmission and ancillary services rates extension Letter announcing two-year extension to CRSP transmission and ancillary services rates Letter announcing revised CRSP transmission rates for FY 2014 Accompanying calculation table for FY 2014 CRSP transmission rate letter Letter announcing revised CRSP transmission rates for FY 2013 Letter announcing revised CRSP transmission rates for FY 2012 Letter announcing revised CRSP transmission rates for FY 2011 Letter announcing revised CRSP transmission rates for FY 2010 SLCA/IP 9/16/2013 WAPA-161 FRN, SLCA/IP firm power rate extension Letter announcing two-year extension to SLCA/IP firm power rate SLCA/IP Tentative Rate Adjustment Schedule

278

Frontier Power Company | Open Energy Information  

Open Energy Info (EERE)

Power Company Power Company Place Ohio Utility Id 6804 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial And Industrial Lighting And Power Service Commercial Large Power Service Residential Sales,Residential Sales Seasonal And Public Building Service Residential Average Rates Residential: $0.1160/kWh Commercial: $0.1180/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Frontier_Power_Company&oldid=410728"

279

Operator renewal theory and mixing rates for dynamical systems with in nite measure  

E-Print Network [OSTI]

Operator renewal theory and mixing rates for dynamical systems with in#12;nite measure Ian of operator renewal sequences in the context of in#12;nite ergodic theory. For large classes of dynamical for mixing rates. Sarig [37] introduced a powerful new technique, operator renewal theory, to obtain precise

280

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

SciTech Connect (OSTI)

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Meet with Large Businesses  

Broader source: Energy.gov (indexed) [DOE]

Meet with Large Businesses Meet with Large Businesses and learn about upcoming acquisitions! * Federal Energy Management Program (FEMP) * National Renewable Energy Laboratory (NREL) * Small Business Administration (SBA) * U.S. Department of Energy / Energy, Efficiency, and Renewable Energy (EERE) * U.S. Department of Energy / Golden Field Office (GFO) * Western Area Power Administration (WAPA) * Colorado Procurement Technical Assistance Center (PTAC)

282

Power Marketing - Sierra Nevada Region - Western Area Power Administra...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pool Resource Adequacy Capacity Plan Rates You are here: SN Home page > Power Marketing Power Marketing Depicts SNR's service area, which extends from northern and central...

283

Rate Schedules  

Broader source: Energy.gov [DOE]

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

284

UCSD Biomass to Power Economic Feasibility Study  

E-Print Network [OSTI]

Biofuels,LLC UCSDBiomasstoPower EconomicFeasibilityFigure1:WestBiofuelsBiomassGasificationtoPowerrates... 31 UCSDBiomasstoPower?Feasibility

Cattolica, Robert

2009-01-01T23:59:59.000Z

285

Idaho Power Co (Oregon) | Open Energy Information  

Open Energy Info (EERE)

Oregon) Oregon) Jump to: navigation, search Name Idaho Power Co Place Oregon Utility Id 9191 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 1 (Residential Service) Residential 19 (Large Power Service Secondary Service) Commercial 7 (Small General Service Three Phase) Commercial 9 (Large General Service Secondary Three Phase Service) Commercial Average Rates Residential: $0.0776/kWh Commercial: $0.0672/kWh Industrial: $0.0533/kWh The following table contains monthly sales and revenue data for Idaho Power Co (Oregon). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS

286

E-Print Network 3.0 - accelerated evolutionary rate Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

rate Search Powered by Explorit Topic List Advanced Search Sample search results for: accelerated evolutionary rate...

287

E-Print Network 3.0 - accelerated evolutionary rates Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

rates Search Powered by Explorit Topic List Advanced Search Sample search results for: accelerated evolutionary rates...

288

Inferring the Rate-Length Law of Protein Folding  

E-Print Network [OSTI]

We investigate the rate-length scaling law of protein folding, a key undetermined scaling law in the analytical theory of protein folding. We demonstrate that chain length is a dominant factor determining folding times, and that the unambiguous determination of the way chain length corre- lates with folding times could provide key mechanistic insight into the folding process. Four specific proposed laws (power law, exponential, and two stretched exponentials) are tested against one an- other, and it is found that the power law best explains the data. At the same time, the fit power law results in rates that are very fast, nearly unreasonably so in a biological context. We show that any of the proposed forms are viable, conclude that more data is necessary to unequivocally infer the rate-length law, and that such data could be obtained through a small number of protein folding experiments on large protein domains.

Lane, Thomas J

2013-01-01T23:59:59.000Z

289

Influence of a Modification of the Petcoke/Coal Ratio on the Leachability of Fly Ash and Slag Produced from a Large PCC Power Plant  

SciTech Connect (OSTI)

Co-firing of coal with inexpensive secondary fuels such as petroleum coke is expected to increase in the near future in the EU given that it may provide certain economic and environmental benefits with respect to coal combustion. However, changes in the feed fuel composition of power plants may modify the bulk content and the speciation of a number of elements in fly ash and slag. Consequently, leachability of these byproducts also can be modified. This study is focused on identifying the changes in the environmental quality of co-fired fly ash and slag induced by a modification of the petcoke/coal ratio. Petcoke was found to increase the leachable content of V and Mo and to enhance the mobility of S and As. However, with the exception of these elements, the addition of this secondary fuel did not drastically modify the bulk composition or the overall leachability of the resulting fly ash and slag.

Izquierdo,M.; Font, O.; Moreno, N.; Querol, X.; Huggins, F.; Alvarez, E.; Diez, S.; Otero, P.; Ballesteros, J.; Gimenez, A.

2007-01-01T23:59:59.000Z

290

The analysis and specification of large high-pressure, high-temperature valves for combustion turbine protection in second-generation PFB power plants: Topical report  

SciTech Connect (OSTI)

The purpose of this study was to provide a specification for the high-pressure/high-temperature valves for turbine overspeed protection in a commercial-scale second-generation pressurized fluidized bed combustion (PFBC) power plant. In the event of a loss of external (generator) load, the gas turbine rapidly accelerates from its normal operating speed. Protection from excessive overspeed can be maintained by actuation of fuel isolation and air bypass valves. A design specification for these valves was developed by analyses of the turbine/compressor interaction during a loss of load and analyses of pressure and flow transients during operation of the overspeed protection valves. The basis for these analyses was the Phase 1 plant conceptual design prepared in 1987.

Not Available

1994-08-01T23:59:59.000Z

291

South Central Power Company | Open Energy Information  

Open Energy Info (EERE)

Central Power Company Central Power Company Place Ohio Utility Id 18085 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Schedule GS General Service Schedule LP Large Power Service Schedule R Residential Service Residential Average Rates Residential: $0.1020/kWh Commercial: $0.0973/kWh Industrial: $0.0749/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=South_Central_Power_Company&oldid=411543

292

Southeast Colorado Power Assn | Open Energy Information  

Open Energy Info (EERE)

Southeast Colorado Power Assn Southeast Colorado Power Assn Place Colorado Utility Id 17592 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes ISO Other Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Colorado Large Power Industrial Farm & Home/Single Phase - General Residential General Service Commercial General Service - Demand Commercial General Service - Standby Service Industrial General Service - Time of Day Commercial Heating and Water Heating Residential Industrial Large Power Industrial Irrigation & Water Pumping Commercial

293

Alpena Power Co | Open Energy Information  

Open Energy Info (EERE)

Power Co Power Co Jump to: navigation, search Name Alpena Power Co Place Michigan Utility Id 392 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Alternative Energy Manufacturing Industrial Experimental Primary Distribution Service Industrial General Service Commercial General Service (Distribution Only) Commercial Large Industrial Service (13,200 Volts or Lower) Industrial Large Industrial Service (13,800 Volts) Industrial Large Industrial Service (34,500 Volts) Industrial

294

Influence of a modification of the petcoke/coal ratio on the leachability of fly ash and slag produced from a large PCC power plant  

SciTech Connect (OSTI)

Co-firing of coal with inexpensive secondary fuels such as petroleum coke is expected to increase in the near future in the EU given that it may provide certain economic and environmental benefits with respect to coal combustion. However, changes in the feed fuel composition of power plants may modify the bulk content and the speciation of a number of elements in fly ash and slag. Consequently, leachability of these byproducts also can be modified. This study is focused on identifying the changes in the environmental quality of co-fired fly ash and slag induced by a modification of the petcoke/coal ratio. Petcoke was found to increase the leachable content of V and Mo and to enhance the mobility of S and As. However, with the exception of these elements, the addition of this secondary fuel did not drastically modify the bulk composition or the overall leachability of the resulting fly ash and slag. 30 refs., 3 figs., 2 tabs.

Maria Izquierdo; Oriol Font; Natalia Moreno (and others) [CSIC, Barcelona (Spain). Institute of Earth Sciences 'Jaume Almera'

2007-08-01T23:59:59.000Z

295

Bonneville Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

o Includes option to elect into Shared Rate Plan, if room under limit Bonneville Power Administration 061708 Revision (Original version issued externally April 11, 2008)...

296

Power corrections in the decay rate and distributions in B{r_arrow}X{sub s}scr(l){sup +}scr(l){sup {minus}} in the standard model  

SciTech Connect (OSTI)

We investigate the leading power corrections to the decay rates and distributions in the decay B{r_arrow}X{sub s}scr(l){sup +}scr(l){sup {minus}} in the standard model (SM) using heavy quark expansion (HQE) in (1/m{sub b}) and a phenomenological model implementing the Fermi motion effects of the b quark bound in the B hadron. In the HQE method, we find that including the leading power corrections the decay width {Gamma}(B{r_arrow}X{sub s}scr(l){sup +}scr(l){sup {minus}}) decreases by about 4{percent} and the branching ratio B(B{r_arrow}X{sub s}scr(l){sup +}scr(l){sup {minus}}) by about 1.5{percent} from their (respective) parton model values. The dilepton invariant mass spectrum is found to be stable against power corrections over a good part of this spectrum. However, near the high-mass end point this distribution becomes negative with the current value of the nonperturbative parameter {lambda}{sub 2} (the {lambda}{sub 1}-dependent corrections are found to be innocuous), implying the breakdown of the HQE method in this region. Our results are at variance with the existing ones in the literature in both the decay rate and the invariant dilepton mass distribution calculated in the HQE approach. As an alternative, we implement the nonperturbative effects in the decay B{r_arrow}X{sub s}scr(l){sup +}scr(l){sup {minus}} using a phenomenologically motivated Gaussian Fermi motion model. We find small corrections to the branching ratio, but the nonperturbative effects are perceptible in both the dilepton mass distribution and the forward-backward asymmetry in the high dilepton mass region. (Abstract Truncated)

Ali, A.; Hiller, G. [Deutsches Elektronen-Synchroton DESY, Notkestrasse 85, D-22603 Hamburg (Germany)] [Deutsches Elektronen-Synchroton DESY, Notkestrasse 85, D-22603 Hamburg (Germany); Handoko, L.T.; Morozumi, T. [Department of Physics, Hiroshima University, 1-3-1 Kagamiyama, Higashi Hiroshima - 739 (Japan)] [Department of Physics, Hiroshima University, 1-3-1 Kagamiyama, Higashi Hiroshima - 739 (Japan)

1997-04-01T23:59:59.000Z

297

Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

298

Wind Power Excites Utility Interest  

Science Journals Connector (OSTI)

...rated at 200 kilowatts peak power output in Clayton, N.M...megawatts (2000 kilowatts) peak power output, is undergoing initial...output fed into the grid of the Bonneville Power Administration. Boeing estimates its machine...

R. JEFFREY SMITH

1980-02-15T23:59:59.000Z

299

Power network analysis and optimization  

E-Print Network [OSTI]

and J. N. Kozhaya, Fast power grid simulation, in Proc.C. Chen, Efficient large-scale power grid analysis based onare connected between power grid nodes and the ground. Time-

Zhang, Wanping

2009-01-01T23:59:59.000Z

300

Power and Frequency Control as it Relates to Wind-Powered Generation  

E-Print Network [OSTI]

of large amounts of wind power production might requirewill be satisfactory as wind power provides an increasing64 7.2 Wind Power in Relation to System

Lacommare, Kristina S H

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Rail Coal Transportation Rates  

U.S. Energy Information Administration (EIA) Indexed Site

reports reports Coal Transportation Rates to the Electric Power Sector With Data through 2010 | Release Date: November 16, 2012 | Next Release Date: December 2013 | Correction Previous editions Year: 2011 2004 Go Figure 1. Deliveries from major coal basins to electric power plants by rail, 2010 Background In this latest release of Coal Transportation Rates to the Electric Power Sector, the U.S. Energy Information Administration (EIA) significantly expands upon prior versions of this report with the incorporation of new EIA survey data. Figure 1. Percent of total U.S. rail shipments represented in data figure data Previously, EIA relied solely on data from the U.S. Surface Transportation Board (STB), specifically their confidential Carload Waybill Sample. While valuable, due to the statistical nature of the Waybill data,

302

Kansas City Power & Light Co | Open Energy Information  

Open Energy Info (EERE)

City Power & Light Co City Power & Light Co Place Kansas Utility Id 10000 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Schedule LGS Large Secondary Service >1000kW Commercial Schedule LGS Large Secondary Service <1000kW Commercial Schedule LPS Large Power Service Industrial Schedule MGS Medium General Service Commercial Schedule R Residential Service Residential Schedule RTOD Residential Time of Day Service Residential Schedule SGS Small General Service >25kW Commercial Schedule SGS Small General Service <24kW Commercial Average Rates Residential: $0.0980/kWh Commercial: $0.0784/kWh

303

Multiple System Rate Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DSW Multiple System Transmission Rate Process DSW Multiple System Transmission Rate Process Federal Register Notice Withdrawing Rate Proposal (PDF) Formal Process Extension Federal Register Notice (PDF) Customer Savings Under Various MSTR (XLS) Public Information Forum March 29, 2005 Customer Meeting Overview (Power Point) Customer Meeting Overview (PDF) Customer Meeting Transcript (PDF) Public Comment Forum April 6, 2005 Customer Meeting Transcript (PDF) Response Letter 5-17-05 (PDF) Customer Letters Tonopah ID-5/25/05 (PDF) APS-5/26/05 (PDF) SRP-5/27/05 (PDF) RSLynch-6/1/05 (PDF) KRSaline-6/1/05 (PDF) Formal Process Federal Register Notice (Word) Federal Register Notice (PDF) Brochure (Word) Appendices to Brochure: A B C D E1 E2 F1 F2 GH Public Information Forum July 14, 2004 Customer Meeting Overview (Power Point)

304

The Large Hadron Collider  

Science Journals Connector (OSTI)

...fully from the space available in...the machine construction. The superconducting...for a single sector, the whole...therefore, as the heating increases...was made, a sector was powered...is a slight heating during ramp...Collider. | The construction of the Large...the limited space available in...

2012-01-01T23:59:59.000Z

305

Power Plant Power Plant  

E-Print Network [OSTI]

Basin Center for Geothermal Energy at University of Nevada, Reno (UNR) 2 Nevada Geodetic LaboratoryStillwater Power Plant Wabuska Power Plant Casa Diablo Power Plant Glass Mountain Geothermal Area Lassen Geothermal Area Coso Hot Springs Power Plants Lake City Geothermal Area Thermo Geothermal Area

Tingley, Joseph V.

306

Power Factor Reactive Power  

E-Print Network [OSTI]

power: 130 watts Induction motor PSERC Incandescent lights 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0 power: 150 watts #12;Page 4 PSERC Incandescent Lights PSERC Induction motor with no load #12;Page 5 Incandescent Lights #12;Page 7 PSERC Incandescent lights power: Power = 118 V x 1.3 A = 153 W = 0.15 kW = power

307

Chimney Rock Public Power Dist | Open Energy Information  

Open Energy Info (EERE)

Chimney Rock Public Power Dist Chimney Rock Public Power Dist Jump to: navigation, search Name Chimney Rock Public Power Dist Place Nebraska Utility Id 3495 Utility Location Yes Ownership P NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png ELECTRIC THERMAL STORAGE Commercial GENERAL SEASONAL Commercial IRRIGATION SERVICE Single Phase Commercial IRRIGATION SERVICE Three Phase Commercial IRRIGATION STANDBY RATE, Single Phase Commercial IRRIGATION STANDBY RATE, Three Phase Commercial LARGE POWER SERVICE Commercial RESIDENTIAL SERVICE AND SEASONAL SERVICE Residential

308

Burt County Public Power Dist | Open Energy Information  

Open Energy Info (EERE)

Burt County Public Power Dist Burt County Public Power Dist Jump to: navigation, search Name Burt County Public Power Dist Place Nebraska Utility Id 2599 Utility Location Yes Ownership P NERC Location MRO Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png All Electric Large Power Service Public Educational Institution Commercial Commercial Space Heating Single Phase Service Commercial General Service - Inside City Limits Rate Commercial General Service - Outside City Limits Rate Commercial Grain Dryer Service Single Phase Commercial

309

Kansas City Power & Light Co | Open Energy Information  

Open Energy Info (EERE)

Power & Light Co Power & Light Co (Redirected from KCP&L) Jump to: navigation, search Name Kansas City Power & Light Co Place Kansas Utility Id 10000 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Schedule LGS Large Secondary Service >1000kW Commercial Schedule LGS Large Secondary Service <1000kW Commercial Schedule LPS Large Power Service Industrial Schedule MGS Medium General Service Commercial Schedule R Residential Service Residential Schedule RTOD Residential Time of Day Service Residential Schedule SGS Small General Service >25kW Commercial Schedule SGS Small General Service <24kW Commercial

310

Wheat Belt Public Power Dist | Open Energy Information  

Open Energy Info (EERE)

Belt Public Power Dist Belt Public Power Dist Jump to: navigation, search Name Wheat Belt Public Power Dist Place Nebraska Utility Id 20509 Utility Location Yes Ownership P NERC Location WECC/MRO NERC MRO Yes NERC WECC Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png DISTRIBUTION HEAVY INDUSTRIAL (E-2) Commercial GENERAL PURPOSE - LARGE COMMERCIAL Industrial GENERAL PURPOSE - LARGE COMMERCIAL Commercial GENERAL PURPOSE - SMALL Residential GENERAL PURPOSE - SMALL COMMERCIAL Commercial IRRIGATION Multi Phase Commercial LARGE POWER Industrial

311

Replacement-3 Wholesale Power Rate Schedule  

Broader source: Energy.gov [DOE]

Area: Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky, southern Illinois System: CU

312

Rio Grande Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) R5-F1 1940 - 1949 3.000 - 8.000 (declining block) 1.250 N.A. R5-F2 549 - 474 4.000 - 4.5000...

313

Seedskadee Participating Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) R4-F1 thru 474 3.000 1.275 6.000 UC-F1 474-677 3.000 1.320 6.110 UC-F2 (Firm Only) 6...

314

Yakutat Power Inc | Open Energy Information  

Open Energy Info (EERE)

Yakutat Power Inc Yakutat Power Inc Jump to: navigation, search Name Yakutat Power Inc Place Alaska Utility Id 30150 Utility Location Yes Ownership P NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Interruptible Commercial Large Commercial Commercial Residential; Residential Small Commercial Commercial Average Rates Residential: $0.4830/kWh Commercial: $0.3990/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

315

Lafayette Public Power Auth | Open Energy Information  

Open Energy Info (EERE)

Public Power Auth Public Power Auth Jump to: navigation, search Name Lafayette Public Power Auth Place Louisiana Utility Id 11235 Utility Location Yes Ownership P NERC Location SPP NERC SPP Yes RTO SPP Yes Activity Generation Yes Activity Buying Transmission Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large General Service Primary Service Discount Commercial Large General Service: Schedule C-2 Commercial Private Security Lighting: Schedule L-3 - 1000 W MV Floodlights Lighting Private Security Lighting: Schedule L-3 - 100W HPS Luminaires Lighting Private Security Lighting: Schedule L-3 - 150W HPS Luminaires Lighting

316

Kentucky Power Co (Kentucky) | Open Energy Information  

Open Energy Info (EERE)

Kentucky Power Co Kentucky Power Co Place Kentucky Utility Id 22053 References EIA Form EIA-861 Final Data File for 2010 - File2_2010[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png LGS - Large General Service Secondary Commercial LGS-TOD - Large General Service Time of Day Commercial MGS - Medium General Service Secondary Commercial MGSTOD - Medium General Service Time of Day Commercial QP - Quantity Power Secondary Commercial RS - Residential Service Residential RS-LM-TOD - Residential Service Load management Time of Day Residential RS-TOD - Residential Service Time of Day Residential RS-TOD2 - Residential Service Time of Day 2 Residential

317

Alaska Power and Telephone Co | Open Energy Information  

Open Energy Info (EERE)

Telephone Co Telephone Co Jump to: navigation, search Name Alaska Power and Telephone Co Place Washington Utility Id 219 Utility Location Yes Ownership I NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Sch No. A1-(Residential & Small Commercial Rates) Residential Sch No. A2-(Bulk Power Rates) Commercial Sch No. A3-(Bulk Power Rates for Large Customers)

318

Meeker Coop Light & Power Assn | Open Energy Information  

Open Energy Info (EERE)

Meeker Coop Light & Power Assn Meeker Coop Light & Power Assn Jump to: navigation, search Name Meeker Coop Light & Power Assn Place Minnesota Utility Id 12227 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Retail Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Cycle Air Conditioning Residential Dual Fuel Space Heating Residential Heat Pump and Cooling Residential Irrigation Industrial Large Power Peak Alert: 350 KVA or Greater Industrial Large Power Peak Alert: 350 KVA or Greater- Non Control Commercial

319

Bozrah Light & Power Company | Open Energy Information  

Open Energy Info (EERE)

Bozrah Light & Power Company Bozrah Light & Power Company Jump to: navigation, search Name Bozrah Light & Power Company Place Connecticut Utility Id 2089 Utility Location Yes Ownership M NERC Location NPCC NERC NPCC Yes ISO NE Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Farm Service Commercial General Service (GET Exempt), For Water Heating Industrial High Voltage Large General Service Commercial High Voltage Large General Service (GRT Exempt) Commercial Household Service Residential Large General Service (GET Exempt)- Primary Industrial Large General Service (GET Exempt)- Secondary Industrial

320

Vinton Public Power Auth | Open Energy Information  

Open Energy Info (EERE)

Auth Auth Jump to: navigation, search Name Vinton Public Power Auth Place Louisiana Utility Id 19869 Utility Location Yes Ownership P NERC Location SERC NERC SERC Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Sec. 25-26.11. Residential service Residential Sec. 25-26.12. Commercial service. Commercial Sec. 25-26.13. Large light and power consumers. Industrial Sec. 25-26.14. Security lights 175-watt bulbs Commercial Sec. 25-26.14. Security lights 400-watt bulbs Commercial Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Riddell Revolution Speed Adult Large  

E-Print Network [OSTI]

Available: Adult Football Helmet Detailed Ratings May 2012 Riddell 360 Sample 1 2 3 Size Adult Large Adult.237 0.239 Overall STAR 0.239 Best Available: A total of 15 adult football helmet models that have been values. Helmet Ratings #12;Adult Football Helmet Detailed Ratings May 2012 Schutt ION 4D Sample 1 2 3

Lu, Chang

322

Clyde Light & Power | Open Energy Information  

Open Energy Info (EERE)

Power Power Jump to: navigation, search Name Clyde Light & Power Place Ohio Utility Id 3824 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png C1 - General Service - No Demand Commercial C1A - General Service No Demand - Three Phase Commercial C2 - Commercial Commercial FL - Flood Light Lighting G1- General Service w/ Demand Commercial LP1- Large Power Secondary Industrial LP2 - Primary Industrial R1 - Residential Residential

323

Georgia Power Co | Open Energy Information  

Open Energy Info (EERE)

Georgia Power Co Georgia Power Co Jump to: navigation, search Name Georgia Power Co Place Georgia Utility Id 7140 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png BU-9 - Back Up Service DSM-R-4 - Demand Side Management Residential Residential Irrigation Off-Peak Service Commercial Off-Peak Service Rider - Schedule: OP-5 PLL-7 (Power and Light Large) Commercial

324

Coast Electric Power Assn | Open Energy Information  

Open Energy Info (EERE)

Coast Electric Power Assn Coast Electric Power Assn Jump to: navigation, search Name Coast Electric Power Assn Place Mississippi Utility Id 3841 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Churches Commercial Churches Time of Use Commercial Commercial (Over 25 kW) Commercial Commercial (Over 25 kW) Time of Use Commercial Industrial (Over 1000 kW) Industrial Industrial (Over 1000 kW) Time of Use Industrial Large Power (Over 2500 kW) Industrial Light Service HPS 100 W - Rural Lighting

325

Wireless Power Transfer  

ScienceCinema (OSTI)

Wireless Power Transfer is an innovative approach using magnetic resonance coupling of air core transformers designed for today's growing plug-in electric vehicle market. This technology can provide a convenient, safe and flexible means to charge electric vehicles under stationary and dynamic conditions. Plug-in Electric Vehicles (PEV) are burdened by the need for cable and plug charger, galvanic isolation of the on-board electronics, bulk and cost of this charger and the large energy storage system (ESS) packs needed. With a system where you have to physically plug in there are a number of occasions where the owner could very well forget to charge the vehicle. For stationary applications (like charging of a PHEV at home), ORNL's innovative wireless power transfer technology adds a convenience factor compared to actually plugging in which will mean that the vehicle will have a full charge every morning. Electric vehicle charging must be safe, compact and efficient in order to be convenient for customers. By reconfiguring the transformer and altering the resonance frequency, energy is transferred to the battery with lower energy losses and with fewer demands on the primary circuit by the rest of the transformer system. The ORNL discovery shows that sufficient power for the battery can be transferred from the primary to secondary circuits without significant energy losses if the operating frequency is set at 50% to 95% of the resonance frequency of the circuit. The electrical power is then transmitted to the chargeable battery, which is electrically coupled to the secondary circuit through the air core transformer. Some advantages include: Reduced energy losses during transfer of energy to the battery; A charge potential that is relatively unaffected by up to 25% misalignment of vehicle; and Other receiving components draw less power from the primary circuit. These advantages allow wireless power technology applications to expand at the workplace and beyond as the demand for EV rises. For vehicles that operate over a fixed route such as busses and shuttle vehicles, Wireless Power Transfer (WPT) means that a smaller battery pack can be used. In the traditional system, the battery pack is designed to accommodate the needs of the entire route or shift. With WPT the battery can be downsized because it can be charged when the vehicle stops on its route (a rental car shuttle bus, for example, can charge when it waits in the terminal and again when it waits at the rental car place. Thus the battery only needs enough charge to get to the next stop. This decrease in battery size means significant cost savings to electrify the vehicle. This technology enables efficient "opportunity charging stations" for predefined routes and planned stops reducing down time. Charging can occur in minutes. This improvement also eliminates the harmful emissions that occur in garages while buses are at idle during charging. In larger cities, dynamic charging offers an even greater impact utilizing existing infrastructure. As vehicles travel along busy freeways and interstate systems, wireless charging can occur while the vehicle is in motion. With this technology a vehicle essentially has unlimited electric range while using a relatively small battery pack. In-motion charging stations use vehicle sensors to alert the driver. Traveling at normal speeds, sensors establish in-motion charging. WPT transmit pads sequentially energize to the negotiated power level based on vehicle speed and its requested charging energy. Lower power when vehicle speed is slow and much higher power for faster moving vehicles. Vehicle to Infrastructure communications (V2I) coordinates WPT charging level according to on-board battery pack state-of-charge. V2I activates the roadway transmit pads placing them in standby mode and negotiates charging fee based on prevailing grid rate and vehicle energy demand. Dynamic charging would allow electricity to supply a very large fraction of the energy for the transportation sector and reduce greatly petroleum consump

None

2013-11-19T23:59:59.000Z

326

National Utility Rate Database: Preprint  

SciTech Connect (OSTI)

When modeling solar energy technologies and other distributed energy systems, using high-quality expansive electricity rates is essential. The National Renewable Energy Laboratory (NREL) developed a utility rate platform for entering, storing, updating, and accessing a large collection of utility rates from around the United States. This utility rate platform lives on the Open Energy Information (OpenEI) website, OpenEI.org, allowing the data to be programmatically accessed from a web browser, using an application programming interface (API). The semantic-based utility rate platform currently has record of 1,885 utility rates and covers over 85% of the electricity consumption in the United States.

Ong, S.; McKeel, R.

2012-08-01T23:59:59.000Z

327

Initial Studies Toward Real-Time Transmission Path Rating  

SciTech Connect (OSTI)

Demand continues to increase while transmission line construction is being constrained by multiple factors economic, environmental, and political. Effective and efficient utilization of transmission lines is thus of great importance in an open access environment. Large blocks of power are transferred from areas with inexpensive generation to heavy load demand areas or areas with high generation costs. This results in some transmission paths being loaded closer to their path ratings, which limits further power transfer between areas. Traditionally, rating of important paths was determined off line by assuming the worst-case study scenario; once determined, it could be used for years. With increasing uncertainty arising from rapid growth of renewable energy and smart technologies, path rating studies are needed in near-real time to account for the latest system status and support a reliable and economic power grid. This paper adopts a simplified procedure based on standards of the North American Electric Reliability Corporation (NERC) to determine total transfer capability (TTC) or transfer limit for the purpose of demonstrating the benefits and necessity of real-time path rating. Initial studies are conducted to compute TTC of a two-area test system and a 39-bus test system. Results indicate that path rating can be significantly affected by loading conditions, generator schedules, system topology and other factors.

Singh, Ruchi; Diao, Ruisheng; Cai, Niannian; Huang, Zhenyu; Tuck, Brian; Guo, Xinxin

2012-07-26T23:59:59.000Z

328

Southeastern Power Admin | Open Energy Information  

Open Energy Info (EERE)

Power Admin Power Admin Place Georgia Utility Id 29304 Utility Location Yes Ownership F NERC Location SERC NERC FRCC Yes NERC SERC Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Wholesale Power Rate Schedule AP-1-B Commercial Wholesale Power Rate Schedule AP-2-B Commercial Wholesale Power Rate Schedule AP-3-B Commercial Wholesale Power Rate Schedule AP-4-B Commercial Wholesale Power Rate Schedule CBR-1-H Commercial Wholesale Power Rate Schedule CC-1-I Commercial Wholesale Power Rate Schedule CK-1-H Commercial

329

Texas-New Mexico Power Company - Residential Energy Efficiency Programs  

Broader source: Energy.gov (indexed) [DOE]

Texas-New Mexico Power Company - Residential Energy Efficiency Texas-New Mexico Power Company - Residential Energy Efficiency Programs (Texas) Texas-New Mexico Power Company - Residential Energy Efficiency Programs (Texas) < Back Eligibility Low-Income Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Insulation Design & Remodeling Water Heating Windows, Doors, & Skylights Maximum Rebate 20% of TNMP's annual Residential Standard Offer Program incentive budget Program Info State Texas Program Type Utility Rebate Program Rebate Amount Energy Star Rated Home Builders: Custom Residential Large and Small Projects: $260; $0.08/kWh reduction

330

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Market Monitoring Market Monitoring Tools Bernie Lesieutre - LBNL Bob Thomas - Cornell October 18, 2006 Washington, D.C. OE Visualization and Controls Peer Review Market Monitoring Tools: Overview Approach: Use dispatch, profit, revenue/offer price, withholding sensitivities to identify opportunities for local advantage that give some participants market power potential. 2006 Technical Work: Extend prior results to large, RTO-scale systems. Initiate large-scale analysis with RTO (PJM). Evaluate reactive power effects on energy markets. Publication and presentation of results. Market Power: Substitutability Market power boils down to the issue of substitutability Locational Advantage: "Load Pockets" Physical network constraints limit supply to certain loads, so that the incremental demand

331

Results of fly ash quality for disposal options from high thermal shares up to pure biomass combustion in a pilot-scale and large scale pulverized fuel power plants  

Science Journals Connector (OSTI)

Abstract This work evaluated fly ash quality from combustion of high thermal shares of biomass fuels. Woody biomass was (co)combusted in an industrial scale pulverized fuel power plant, and aherbaceous biomass was co-combusted in a pilot-scale test facility. Ashes from the electrostatic precipitator were collected and evaluated for chemical compounds, leaching behavior, and mechanical properties. Results from the large-scale industrial pulverized fuel showed the ashes still had good reactivity and mechanical properties according to EN450-1, which is a good unexpected occurrence regarding strength development. Results from the pilot-scale test facility showed that aherbaceous biomass co-fired up to 50% thermal share does not seem to have any negative impact on existing fly ash utilization routes. It is concluded that co-firing clean woody biomass at a very high thermal share and co-firing a high thermal share of aherbaceous biomass with lignite would not change current utilization practices. In practice ashes from high thermal shares are not used due to safeguards in standards form a lack of experience from enough performance testing. Thus, the findings can lead to support for standards that incorporate other assessment methods for biomass fly ash utilization requirements.

A. Fuller; M. Carbo; P. Savat; J. Kalivodova; J. Maier; G. Scheffknecht

2015-01-01T23:59:59.000Z

332

Fair rate assignment in interference limited multi-hop networks  

E-Print Network [OSTI]

Optimal Link Scheduling and Power Control in CDMA MultihopB. Shro?. , Joint rate control and scheduling in multihopthe joint rate control and scheduling problem, and [26

Arisoylu, Mustafa

2006-01-01T23:59:59.000Z

333

Restoration of Large Damage Volumes in Polymers  

Science Journals Connector (OSTI)

Restoration of Large...regenerative power of tissues...synthetic system that restores...hours. After restoration of impact damage...tripodal ligand system based on the...Ed., CRC Handbook of Chemistry...construction. Restoration of Large...

S. R. White; J. S. Moore; N. R. Sottos; B. P. Krull; W. A. Santa Cruz; R. C. R. Gergely

2014-05-09T23:59:59.000Z

334

Southeastern Power Administration | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southeastern Power Administration Southeastern Power Administration Search Search form Search Southeastern Power Administration Southeastern Power Administration Services Services Home Rate Schedules Acquisition Program Competitive Resource Strategies Annual Reports SEPA FOIA Power Operations Power Operations Home How it Works Generation Quick Facts Mission About Us About Us Home News News Home Press Releases Career Opportunities SEPA History SEPA Video Offices Southeastern Power Administration Southeastern Power Administration Power Operations Click to view a map of SEPA power operations. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina

335

Large Industrial Renewable Energy Purchase Program (New Brunswick) |  

Broader source: Energy.gov (indexed) [DOE]

Large Industrial Renewable Energy Purchase Program (New Brunswick) Large Industrial Renewable Energy Purchase Program (New Brunswick) Large Industrial Renewable Energy Purchase Program (New Brunswick) < Back Eligibility Agricultural Commercial Developer Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Jersey Program Type Performance-Based Incentive Provider New Brunswick Energy and Mines Beginning January 1, 2012 the Large Industrial Renewable Energy Purchase Program allows NB Power to purchase renewable energy generated by its largest customers at a rate of $95/MWh. This renewable energy will count towards meeting the Province's renewable energy targets at a purchase

336

Microsoft Word - News Release -- Rates Initial Proposal Dec ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

utilities, the Bonneville Power Administration today proposed a 6.7 percent average wholesale power rate increase for the fiscal year 2016-2017 rate period. BPA is also proposing...

337

Crow Wing Cooperative Power & Light Comp | Open Energy Information  

Open Energy Info (EERE)

Wing Cooperative Power & Light Comp Wing Cooperative Power & Light Comp Jump to: navigation, search Name Crow Wing Cooperative Power & Light Comp Place Minnesota Utility Id 4577 Utility Location Yes Ownership C NERC Location MAPP NERC MRO Yes ISO MISO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Commercial Dual Fuel Residential Freedom Heating Residential Industrial Industrial Irrigation Industrial Large Power Industrial Off Peak Residential Residential Whole House Heat Pump Residential Average Rates Residential: $0.1020/kWh Commercial: $0.0971/kWh

338

Logan County Coop Power & Light | Open Energy Information  

Open Energy Info (EERE)

County Coop Power & Light County Coop Power & Light Jump to: navigation, search Name Logan County Coop Power & Light Place Ohio Utility Id 11203 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL AND GENERAL SERVICE Commercial FARM AND RESIDENTIAL SERVICE Residential LARGE POWER SERVICE Industrial Security Lighting 175 W LED Lighting Security Lighting 400 W LED Lighting Average Rates Residential: $0.1190/kWh Commercial: $0.1040/kWh Industrial: $0.0724/kWh References

339

Turbine layout for and optimization of solar chimney power conversion units.  

E-Print Network [OSTI]

??ENGLISH ABSTRACT: The power conversion unit of a large solar chimney power plant converts the fluid power, first into mechanical power, and then into electrical (more)

Fluri, Thomas Peter

2008-01-01T23:59:59.000Z

340

Large-dimension, high-ZT Thermoelectric Nanocomposites for High...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Large-dimension, high-ZT Thermoelectric Nanocomposites for High-Power High-efficiency Waste Heat Recovery for Electricity Generation Large-dimension, high-ZT Thermoelectric...

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

The use of real-time off-site observations as a methodology for increasing forecast skill in prediction of large wind power ramps one or more hours ahead of their impact on a wind plant.  

SciTech Connect (OSTI)

ABSTRACT Application of Real-Time Offsite Measurements in Improved Short-Term Wind Ramp Prediction Skill Improved forecasting performance immediately preceding wind ramp events is of preeminent concern to most wind energy companies, system operators, and balancing authorities. The value of near real-time hub height-level wind data and more general meteorological measurements to short-term wind power forecasting is well understood. For some sites, access to onsite measured wind data - even historical - can reduce forecast error in the short-range to medium-range horizons by as much as 50%. Unfortunately, valuable free-stream wind measurements at tall tower are not typically available at most wind plants, thereby forcing wind forecasters to rely upon wind measurements below hub height and/or turbine nacelle anemometry. Free-stream measurements can be appropriately scaled to hub-height levels, using existing empirically-derived relationships that account for surface roughness and turbulence. But there is large uncertainty in these relationships for a given time of day and state of the boundary layer. Alternatively, forecasts can rely entirely on turbine anemometry measurements, though such measurements are themselves subject to wake effects that are not stationary. The void in free-stream hub-height level measurements of wind can be filled by remote sensing (e.g., sodar, lidar, and radar). However, the expense of such equipment may not be sustainable. There is a growing market for traditional anemometry on tall tower networks, maintained by third parties to the forecasting process (i.e., independent of forecasters and the forecast users). This study examines the value of offsite tall-tower data from the WINDataNOW Technology network for short-horizon wind power predictions at a wind farm in northern Montana. The presentation shall describe successful physical and statistical techniques for its application and the practicality of its application in an operational setting. It shall be demonstrated that when used properly, the real-time offsite measurements materially improve wind ramp capture and prediction statistics, when compared to traditional wind forecasting techniques and to a simple persistence model.

Martin Wilde, Principal Investigator

2012-12-31T23:59:59.000Z

342

Cleco Power - Power Miser New Home Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Cleco Power - Power Miser New Home Program Cleco Power - Power Miser New Home Program Cleco Power - Power Miser New Home Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Construction Design & Remodeling Sealing Your Home Windows, Doors, & Skylights Ventilation Heating Heat Pumps Water Heating Program Info State Louisiana Program Type Utility Rate Discount Rebate Amount Discount: 10% discount on energy from November through April for the first five years that the customer lives in participating house. Heat Pump Bonus: Up to $1,000 for eligible heat pump installations Provider Cleco Power Louisiana's Cleco Power offers energy efficiency incentives to eligible

343

Power Services Financial Information (pbl/about)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2007 Wholesale Power (WP-07) Rate Case WP-07 Rate Case Workshop Materials Power Function Review (PFR) Financial Choices for FY 2003-2006 Financial-Based Cost Recovery Adjustment...

344

Measurement of a Large Chemical Reaction Rate between Ultracold Closed-Shell Ca40 Atoms and Open-Shell Yb+174 Ions Held in a Hybrid Atom-Ion Trap  

Science Journals Connector (OSTI)

Ultracold Yb+174 ions and Ca40 atoms are confined in a hybrid trap. The charge exchange chemical reaction rate constant between these two species is measured and found to be 4 orders of magnitude larger than recent measurements in other heteronuclear systems. The structure of the CaYb+ molecule is determined and used in a calculation that explains the fast chemical reaction as a consequence of strong radiative charge transfer. A possible explanation is offered for the apparent contradiction between typical theoretical predictions and measurements of the radiative association process in this and other recent experiments.

Wade G. Rellergert; Scott T. Sullivan; Svetlana Kotochigova; Alexander Petrov; Kuang Chen; Steven J. Schowalter; Eric R. Hudson

2011-12-07T23:59:59.000Z

345

Mesofluidic magnetohydrodynamic power generation  

E-Print Network [OSTI]

Much of the previous research into magnetohydrodynamics has involved large-scale systems. This thesis explores the miniaturization and use of devices to convert the power dissipated within an expanding gas flow into ...

Fucetola, Jay J

2012-01-01T23:59:59.000Z

346

More Power from Below  

Science Journals Connector (OSTI)

...MWe). Most new geothermal power plants brought...electric generation. Geothermal water at temperatures...used for bathing, heating, and greenhouses...Large-scale district heating projects have operated...are heated with geothermal water. Temperatures...

Joseph N. Moore; Stuart F. Simmons

2013-05-24T23:59:59.000Z

347

Crowd-powered systems  

E-Print Network [OSTI]

Crowd-powered systems combine computation with human intelligence, drawn from large groups of people connecting and coordinating online. These hybrid systems enable applications and experiences that neither crowds nor ...

Bernstein, Michael Scott

2012-01-01T23:59:59.000Z

348

Roosevelt Public Power Dist | Open Energy Information  

Open Energy Info (EERE)

Public Power Dist Public Power Dist Place Nebraska Utility Id 16164 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Industrial 12.5 kv Industrial Large Commercial, OVER 50KVA Commercial Net Metering Residential Over 50 HP Irrigation Commercial Residential -General Purpose Residential Small 3 Phase Commercial Standby Commercial Standby Irrigation Commercial Time of Day- single phase Under 50 HP Irrigation Commercial Average Rates Residential: $0.1050/kWh Commercial: $0.1190/kWh Industrial: $0.1150/kWh

349

Wind power costs in Portugal Saleiro, Carla  

E-Print Network [OSTI]

was originated from hydroelectric power stations. Portugal assumed that the Electricity System Expansion Plan will proceed with the construction of new hydroelectric power plants with an installed power rating of more

350

GHG emissions and energy performance of offshore wind power  

Science Journals Connector (OSTI)

Abstract This paper presents specific life cycle GHG emissions from wind power generation from six different 5MW offshore wind turbine conceptual designs. In addition, the energy performance, expressed by the energy indicators Energy Payback Ratio (EPR) Energy Payback Time (EPT), is calculated for each of the concepts. There are currently few LCA studies in existence which analyse offshore wind turbines with rated power as great as 5MW. The results, therefore, give valuable additional environmental information concerning large offshore wind power. The resulting GHG emissions vary between 18 and 31.4g CO2-equivalents per kWh while the energy performance, assessed as EPR and EPT, varies between 7.5 and 12.9, and 1.6 and 2.7 years, respectively. The relatively large ranges in GHG emissions and energy performance are chiefly the result of the differing steel masses required for the analysed platforms. One major conclusion from this study is that specific platform/foundation steel masses are important for the overall GHG emissions relating to offshore wind power. Other parameters of importance when comparing the environmental performance of offshore wind concepts are the lifetime of the turbines, wind conditions, distance to shore, and installation and decommissioning activities. Even though the GHG emissions from wind power vary to a relatively large degree, wind power can fully compete with other low GHG emission electricity technologies, such as nuclear, photovoltaic and hydro power.

Hanne Lerche Raadal; Bjrn Ivar Vold; Anders Myhr; Tor Anders Nygaard

2014-01-01T23:59:59.000Z

351

Analysis for robotic assembly of large flexible space structures  

E-Print Network [OSTI]

Space solar power is a renewable, environment-friendly alternative to satisfy future terrestrial power needs. Space solar power stations will need to have large dimensions (on the order of hundreds of meters) to be able ...

Mangalgiri, Vickram S. (Vickram Suresh), 1979-

2004-01-01T23:59:59.000Z

352

Bonneville Power Administration Administrator Steve Wright  

E-Print Network [OSTI]

Bonneville Power Administration Administrator Steve Wright PO Box 12999 Portland, OR 97208 Dear salmon, clean, renewable energy, and a healthy economy. The Bonneville Power Administration (BPA largely failed to meet their legal salmon recovery responsibilities. I urge the Bonneville Power

353

Coahoma Electric Power Assn | Open Energy Information  

Open Energy Info (EERE)

Coahoma Electric Power Assn Coahoma Electric Power Assn Place Mississippi Utility Id 3839 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 11 - Residential Electric Service Single Phase Residential 11 - Residential Electric Service Three Phase Residential 12 - General Service Single Phase 12 - General Service Three Phase 13 - Large Commercial Service Commercial 14 - Industrial Power Service Industrial 15 - Irrigation Service 16 - Fish Farming Service 17 - Grain Bin/Dryer Service 18 - Cotton Gin Service

354

Photovoltaic Degradation Rates -- An Analytical Review  

SciTech Connect (OSTI)

As photovoltaic penetration of the power grid increases, accurate predictions of return on investment require accurate prediction of decreased power output over time. Degradation rates must be known in order to predict power delivery. This article reviews degradation rates of flat-plate terrestrial modules and systems reported in published literature from field testing throughout the last 40 years. Nearly 2000 degradation rates, measured on individual modules or entire systems, have been assembled from the literature, showing a median value of 0.5%/year. The review consists of three parts: a brief historical outline, an analytical summary of degradation rates, and a detailed bibliography partitioned by technology.

Jordan, D. C.; Kurtz, S. R.

2012-06-01T23:59:59.000Z

355

Bremen Electric Light & Power Co | Open Energy Information  

Open Energy Info (EERE)

Bremen Electric Light & Power Co Bremen Electric Light & Power Co Jump to: navigation, search Name Bremen Electric Light & Power Co Place Indiana Utility Id 2192 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial: Single Phase Commercial Commercial: Three Phase Commercial Industrial: Single Phase Industrial Industrial: Three Phase Industrial Large Power Industrial Mega Industrial Power Industrial Municipal: Single Phase Commercial Municipal: Three Phase Commercial Residential Residential

356

Analysis of the Potential for a Heat Island Effect in Large Solar Vasilis Fthenakis1,2  

E-Print Network [OSTI]

Abstract -- Large-scale solar power plants are being built at a rapid rate, and are setting up to use utility scale PV plant and the surrounding region. The results from these simulations can be extrapolated hundreds of thousands of acres of land surface. The thermal energy flows to the environment related

357

Power MEMS 2005, Nov. 28-30, 2005, Tokyo, Japan We have developed a large-entrainment-ratio micro ejector to supply fuel-air mixture for a catalytic combustor. As the key  

E-Print Network [OSTI]

. Catalytic combustion of the fuel then takes place, and heat generated is used in various micro power devices +81-3-5800-6999, E-mail fan@thtlab.t.u-tokyo.ac.jp Figure 1. Configuration of micro heat generation system. 1 INTRODUCTION In order to produce portable power generating devices from hydrocarbon fuels

Kasagi, Nobuhide

358

High power  

Science Journals Connector (OSTI)

... 1970s technomanic projects such as nuclear power stations were still in vogue. Environmentalists argued that solar power seemed a far safer, cheaper and reassuringly low-tech power source. The technomaniacs ... tech power source. The technomaniacs, fearing that they were losingthis argument, sought to hijack solar power themselves. They proposed an enormously expensive and complicated ...

David Jones

1994-03-03T23:59:59.000Z

359

Model predictive control of power plant superheater comparison of multi model and nonlinear approaches  

E-Print Network [OSTI]

, the responses to large load demand changes (between 50 and 100% of boiler rated power) typical of today variables and control loops is high and many sources of nonlinearity and interactions are present. This increases the plant efficiency because efficiency is proportional to the superheated steam temperature

Johansen, Tor Arne

360

Snap-Together Nuclear Power  

Science Journals Connector (OSTI)

Snap-Together Nuclear Power ... The U.S. moved further along last month on an experiment to build a new generation of nuclear power plant reactors. ... Supporters hope these physically smaller reactors will have more flexible applications and incur less financial risk and construction cost than the nations current fleet of 104 large and aging nuclear power plants. ...

JEFF JOHNSON

2012-12-09T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Glencoe Light & Power Comm | Open Energy Information  

Open Energy Info (EERE)

Glencoe Light & Power Comm Glencoe Light & Power Comm Jump to: navigation, search Name Glencoe Light & Power Comm Place Minnesota Utility Id 7292 Utility Location Yes Ownership M NERC Location MRO ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area/Security Lighting-175 Watt Lighting Area/Security Lighting-400 Watt Lighting Large Industrial Service-Primary Voltage Industrial Large industrial Service-secondary volatge Industrial Residential Service Residential

362

Alaska Electric Light&Power Co | Open Energy Information  

Open Energy Info (EERE)

Light&Power Co Light&Power Co Jump to: navigation, search Name Alaska Electric Light&Power Co Place Alaska Utility Id 213 Utility Location Yes Ownership I NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial & Government Dual Fuel Commercial Experimental Off-Peak Electric Vehicle Charging 10:00 pm - 7:00 am Commercial General Residential Residential Large Commercial Commercial Off-Peak/Heat storage from 10pm-6am Large Commercial Commercial

363

Southern Pine Elec Power Assn | Open Energy Information  

Open Energy Info (EERE)

Pine Elec Power Assn Pine Elec Power Assn Place Mississippi Utility Id 17647 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Agriculture/Farm Multi-Phase Commercial Commercial General Service (Under 75 kVA) Commercial Commercial Large General Service (75 kVA - 1000 kVA) Commercial Commercial/Small power Commercial Distributed Generation Rider Commercial Industrial General Service (Under 75 kVA) Industrial Industrial Large General Service (75 kVA - 1000 kVA) Primary Voltage

364

Southeastern Power Administration | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Southeastern Power Administration Southeastern Power Administration Southeastern Power Administration Power Operations Click to view a map of SEPA power operations. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina More schedules Annual Reports December 28, 2012 Southeastern Power Administration 2012 Annual Report This report reflects our agency's programs,accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012.

365

DSW Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

366

Power Marketing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

UGPS' Marketing Service Area Power Marketing As a marketer of Federal power in the Upper Great Plains Region, the Power Marketing staff provides a variety of services for customers...

367

A power control strategy for flywheel doubly-fed induction machine storage system using artificial neural network  

Science Journals Connector (OSTI)

A large-capacity low-speed flywheel energy storage system (FESS) based on a doubly-fed induction machine (DFIM) consists of a wound-rotor induction machine and a back-to-back converter rated at 3035% of the machine power rating used for rotor excitation. This system has been promoted as a viable mean of energy storage for power system applications as grid frequency support/control, uninterruptible power supply (UPS), power conditioning, and voltage sag mitigation. This paper presents a simple power control strategy based on artificial neural networks (ANN) to charge/discharge a flywheel DFIM (FW-DFIM) storage system while maintaining controllable grid side power. The proposed controller is based on conventional vector control system supplemented by an ANN-based current decoupling network used to develop the required rotor current components based on the required grid power level and flywheel instantaneous speed. The controller is designed to avoid overloading both stator and rotor circuits while the flywheel is charged/discharged. Additionally, it avoids using the required outer power loop or a hysteresis power controller, hence, simplifies the overall control algorithm. The validity of the developed concept along with the effectiveness and viability of the control strategy in power system applications is confirmed by computer simulation using Matlab/Simulink for a medium voltage 1000hp FW-DFIM. The simulation study is carried out for uninterruptible power supply (UPS) applications and power leveling to improve the quality of electric power delivered by wind generators.

A. Abdel-Khalik; A. Elserougi; A. Massoud; S. Ahmed

2013-01-01T23:59:59.000Z

368

Power Sales to Electric Utilities  

SciTech Connect (OSTI)

The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities with 55 MW of electrical output, 4 cogeneration projects with 34.5 MW of generating capability, and 4 wastewater treatment facility digester gas-to-energy projects with 5 MW of electrical production have come on-line (or are in the final stages of construction) since the passage of PURPA. These numbers represent only a small portion of Washington's untapped and underutilized cogeneration and renewable resource generating potentials. [DJE-2005

None

1989-02-01T23:59:59.000Z

369

Taking the 'Large' out of Large Hadron Collider: Computational Breakthrough  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home » News & Publications » News » Science News » Taking the 'Large' out of Large Hadron Collider Taking the 'Large' out of Large Hadron Collider Computational breakthrough hastens modeling of 'tabletop accelerators' August 9, 2010 | Tags: Accelerator Science Contact: Margie Wylie | mwylie@lbl.gov | 510-486-7421 mori1 This 3D simulation shows how laser pulses create plasma wakes that propel electrons forward, much as a surfer is propelled forward by an ocean wave. Laser wakefield acceleration promises electron accelerators that are thousands of times more powerful than, yet a fraction the size of, conventional radio frequency devices. Particle accelerators like the Large Hadron Collider (LHC) at CERN are the big rock stars of high-energy physics-really big. The LHC cost nearly

370

Eastern Iowa Light & Power Coop | Open Energy Information  

Open Energy Info (EERE)

Coop Coop Jump to: navigation, search Name Eastern Iowa Light & Power Coop Place Iowa Utility Id 5605 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 100W High Pressure Sodium Lighting 175W Mercury Vapor Lighting 250W High Pressure Sodium Lighting 400W Mercury Vapor Lighting Heat Plus Space Heating Service Commercial Large General Service Commercial Large General Service- Time of Use Commercial Large Power Service Industrial

371

SOUTHWESTERN POWER ADMINISTRATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

01 01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

372

SOUTHWESTERN POWER ADMINISTRATION  

Broader source: Energy.gov (indexed) [DOE]

9/01 9/01 SOUTHWESTERN POWER ADMINISTRATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects. PROPOSED BY: Southwestern Power Administration. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED: ( 10 CFR 1021, Appendix B to Subpart D, 1-1-03 Edition, Part B4.3 - Electric power marketing rate changes. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix, A or B to Subpart D. (2) There are no extraordinary circumstances related to the proposal that may affect the Significance of the environmental effects of the proposal; and (3) The proposal is not "connected" to other actions with potentially significant impacts, is not related to

373

Utility Rate Discounts | Open Energy Information  

Open Energy Info (EERE)

Discounts Discounts Jump to: navigation, search A few electric utilities offer rate discounts to encourage residential energy efficiency. For homes that meet certain energy efficiency criteria, such as those established by the federal Energy Star program, the owner or tenant is awarded a percentage discount on each month’s electric bill. [1] Contents 1 Utility Rate Discount Incentives 2 References Utility Rate Discount Incentives CSV (rows 1 - 14) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Cleco Power - Power Miser New Home Program (Louisiana) Utility Rate Discount Louisiana Residential Building Insulation Central Air conditioners Clothes Washers Comprehensive Measures/Whole Building Doors Duct/Air sealing Furnaces Heat pumps

374

BPA proposes rate increase to bolster  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RELEASE Thursday, Nov. 8, 2012 CONTACT: Mike Hansen, 503-230-4328 or 503-230-5131 BPA proposes rate increase to bolster federal power and transmission systems Portland, Ore....

375

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Western Area Power Administration Customer Meeting The meeting will begin at 12:30 pm MST We have logged on early for connectivity purposes Please stand-by until the meeting begins Please be sure to call into the conference bridge at: 888-989-6414 Conf. Code 60223 If you have connectivity issues, please contact: 866-900-1011 1 Introduction  Welcome  Introductions  Purpose of Meeting ◦ Status of the SLCA/IP Rate ◦ SLCA/IP Marketing Plan ◦ Credit Worthiness Policy ◦ LTEMP EIS update ◦ Access to Capital  Handout Materials http://www.wapa.gov/crsp/ratescrsp/default.htm 2 SLCA/IP Rate 3 1. Status of Repayment 2. Current SLCA/IP Firm Power Rate (SLIP-F9) 3. Revenue Requirements Comparison Table 4.SLCA/IP Rate 5. Next Steps

376

Definition: Power density | Open Energy Information  

Open Energy Info (EERE)

density density Jump to: navigation, search Dictionary.png Power density The rate of energy flow (power) per unit volume, area or mass. Common metrics include: horsepower per cubic inch, watts per square meter and watts per kilogram.[1][2] View on Wikipedia Wikipedia Definition Power density (or volume power density or volume specific power) is the amount of power (time rate of energy transfer) per unit volume. In energy transformers like batteries, fuel cells, motors, etc. but also power supply units or similar, power density refers to a volume. It is then also called volume power density which is expressed as W/m. Volume power density is sometimes an important consideration where space is constrained. In reciprocated internal combustion engines, power density- power per swept

377

Unobtrusive power proportionality for HPC frameworks  

Science Journals Connector (OSTI)

Building power proportional High Performance Computing (HPC) clusters comprising of servers which are not power-proportional is a well-studied problem, and has the potential to provide large energy savings. However, a large emphasis on maintaining cluster ... Keywords: high-performance computing, meta-system, power proportionality, reliability, unobtrusive

Arka Bhattacharya; David Culler

2014-06-01T23:59:59.000Z

378

Mississippi Power Co | Open Energy Information  

Open Energy Info (EERE)

Mississippi Power Co Mississippi Power Co Place Mississippi Utility Id 12686 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes ISO Other Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Buying Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GS-LVT-6 General Service Electrice Service - Low Voltage Commercial LGS-LV-4 Large General Service - Low Voltage Commercial

379

Clearwater Power Company | Open Energy Information  

Open Energy Info (EERE)

Clearwater Power Company Clearwater Power Company Place Idaho Utility Id 3739 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes ISO Other Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Area Lighting Service Lighting Industrial Area Lighting Service Lighting Industrial Service 7.2 kV and Above Industrial Industrial Service below 7.2 kV Industrial Irrigation Service Commercial Large Commercial Service Commercial Outdoor Security Lighting Service 1000W Lighting

380

Microsoft PowerPoint - Proceedings Cover Sheets  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Conference Poster Conference Poster Critical Review of CO 2 Separation Technologies for Post Combustion Flue Gases May 8-11, 2006 * Hilton Alexandria Mark Center * Alexandria, Virginia Shiaoguo Chen 1 , Yongqi Lu 2 , Massoud Rostam-Abadi 1,2 1 Illinois State Geological Survey 2 University of Illinois at Urbana Champaign 2 Issues With Post-Combustion Flue Gases Unseen Large Scale CO 2 emission rate (500 MWe PC power plant): 500 tonne/hour or 4 MM tonnes/year Flue gas volume: 1.6 million standard cubic meter/hour Low product value Currently meaningful scale for emission control is Enhanced Oil Recovery (EOR). Other applications are all to small to match magnitude of power plants Energy intensive Low CO2 concentration PC around 10-14 % IGCC around 10% NGCC 5% Low (atmospheric) pressure

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Black Hills Power Inc | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Black Hills Power Inc Place Rapid City, South Dakota Utility Id 19545 Utility Location Yes Ownership I NERC Location WECC NERC MRO Yes NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] SGIC[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! Black Hills Power, Inc. Smart Grid Project was awarded $9.576 Recovery Act Funding with a total project value of $19,153,256. Utility Rate Schedules Grid-background.png GL (General Service Large) Commercial GS (General Service - Total Electric) Commercial

382

Nevada Power Co | Open Energy Information  

Open Energy Info (EERE)

Power Co Power Co Place Nevada Utility Id 13407 Utility Location Yes Ownership I NERC Location WECC NERC WECC Yes ISO Other Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png DEFERRED ENERGY ACCOUNTING ADJUSTMENT GS (General Service) Commercial LGS-1 (Large General Service) Commercial

383

Powerful, efficient, robust, electro?acoustic transducers  

Science Journals Connector (OSTI)

The STAR resonant reciprocating transducer began as a lightweight linear alternator design for a space?power free?piston Stirling engine in the early 1990's. It has since been developed into a range of commercially available motors and alternators with rated powers from 100 to over 10 000 watts (acoustic). As motors these are acoustic pressure drivers with unlimited operating life and typical transduction efficiencies of 80?90 percent. This paper explains the electrodynamics and operation of these moving? magnet Lorentz?force devices and the unique geometric configuration that has allowed scaling over such a wide range. We discuss the design and function of the unique single?degree?of?freedom flexure suspension that enables both the compact geometry and unlimited service life without wear. Data is presented from a large sample of units placed in service during the last decade demonstrating the durability and performance of these remarkable devices.

John Corey

2008-01-01T23:59:59.000Z

384

Fuel Cell Portable Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Power Department of Energy Workshop January 17, 2002 2 Portable Markets - Table of Contents 1. Opportunity Summary for Portable Markets 2. Commercialization Path and Resource Map 3. Value Chain Issues 4. Ballard "State of the Art" 5. Fuel Options and Issues 6. Where can the D.O.E. Help 3 Opportunity Summary - Portable Markets Infrequent Frequent Typical Applications Backup - Batteries & Gensets Peaking power and seasonal use; mobile power Preferred Fuels Hydrocarbon & Hydrogen Hydrocarbon (H2?) Total Available Market Large - But Fractured into many apps Moderate Price Target Low (Pockets willing to pay high $ for certain attributes) Moderate (Lifecycle) Environmental Impact Low Moderate Timing Short term Mid term 4 Technical Challenge Low High Micro Markets H2 Backup Power HC Frequent

385

Space-Based Solar Power | Department of Energy  

Energy Savers [EERE]

conditions. Safely transmit power through air at intensities no greater than midday sun. Provide upwards of 1 GW of energy to terrestrial reciever, enough to power a large...

386

Bayesian Analysis for Large Spatial Data  

E-Print Network [OSTI]

simulations, so Bayesian approach is infeasible for large sample size n due to the current computational power limit. In this dissertation, we propose two approaches to address this computational issue, namely, the auxiliary lattice model (ALM) approach...

Park, Jincheol

2012-10-19T23:59:59.000Z

387

Implications of geographic diversity for short-term variability and predictability of solar power.  

E-Print Network [OSTI]

correlation between adjacent wind power plants, Journal of9] H. Holttinen, Hourly wind power variations in the nordicwith large amounts of wind power, VTT, Espoo, Final Report,

Mills, Andrew

2013-01-01T23:59:59.000Z

388

Effect of nuclear ownership on utility bond ratings and yields  

SciTech Connect (OSTI)

The major objective of this study was to test the hypothesis that investors have required an additional interest rate premium before purchasing bonds of utilities with large investments in nuclear facilities. The study required several tasks. First, the literature relating to firm bankruptcy and default was reviewed. Second, the failing financial health of the electric utility industry was assessed in terms of construction problems, the impact of federal and state regulations, and the impact of Three Mile Island. Finally, data were collected on 63 electric utilities. This allowed statistical estimation of the magnitude of the risk premium associated with utility involvement in nuclear power. The effect of this involvement on a utility's bond ratings was also examined. Multiple regression was the statistical tool used for the statistical testing and estimation.

Nesse, R.J.

1982-02-01T23:59:59.000Z

389

Technology, safety and costs of decommissioning a Reference Boiling Water Reactor Power Station. Main report. Volume 1  

SciTech Connect (OSTI)

Technology, safety and cost information is given for the conceptual decommissioning of a large (1100MWe) boiling water reactor (BWR) power station. Three approaches to decommissioning, immediate dismantlement, safe storage with deferred dismantlement and entombment, were studied to obtain comparisons between costs, occupational radiation doses, potential dose to the public and other safety impacts. It also shows the sensitivity of decommissioning safety and costs to the power rating of a BWR in the range of 200 to 1100 MWe.

Oak, H.D.; Holter, G.M.; Kennedy, W.E. Jr.; Konzek, G.J.

1980-06-01T23:59:59.000Z

390

WRTSILWRTSIL Northwest Power and Conservation Council  

E-Print Network [OSTI]

at >46%. Typical net plant heat rate of power plants achieve highW?RTSIL?W?RTSIL? Northwest Power and Conservation Council February 27, 2014 #12;SERVICES POWER PLANTS SHIP POWER Wärtsilä in short Business Areas · Founded in 1834 · Headquarters in Helsinki Finland

391

Chlorite Dissolution Rates  

SciTech Connect (OSTI)

Spreadsheets provides measured chlorite rate data from 100 to 300C at elevated CO2. Spreadsheet includes derived rate equation.

Carroll, Susan

2013-07-01T23:59:59.000Z

392

Chlorite Dissolution Rates  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Spreadsheets provides measured chlorite rate data from 100 to 300C at elevated CO2. Spreadsheet includes derived rate equation.

Carroll, Susan

393

Running Large Scale Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Running Large Scale Jobs Running Large Scale Jobs Users face various challenges with running and scaling large scale jobs on peta-scale production systems. For example, certain...

394

Climate VISION: Private Sector Initiatives: Electric Power: Resources and  

Office of Scientific and Technical Information (OSTI)

Electric Power Industry Climate Initiative (EPICI) Members Electric Power Industry Climate Initiative (EPICI) Members American Public Power Association American Public Power Association Logo The American Public Power Association (APPA) is the service organization for the nation's public power utilities. Edison Electric Institute Edison Electric Institute Logo Edison Electric Institute (EEI) is the premier trade association for U.S. shareholder-owned electric companies, and serves international affiliates and industry associates worldwide. Electric Power Supply Association Electric Power Supply Association Logo The Electric Power Supply Association (EPSA) is the national trade association representing competitive power suppliers, including independent power producers, merchant generators, and power marketers. Large Public Power Council

395

Fusion power: a challenge for materials science  

Science Journals Connector (OSTI)

...large-scale power generation. Nuclear power is not...clean power generation, with a plentiful...of fuel in the reactor vessel, which...continue for future generation thermo-nuclear power plants...directly in a fusion reactor. Not only does...

2010-01-01T23:59:59.000Z

396

Solar electricity-a low power technology  

Science Journals Connector (OSTI)

The author examines the future potential of solar power with regard to its applications. He suggests that although the large size and small power output of solar cell electric systems are obstacles to high power usage, realistic low power applications can make a valuable contribution to world energy needs

L.B. Harris

1982-01-01T23:59:59.000Z

397

2002CALIFORNIAPOWERMIX 2002 NET SYSTEM POWER CALCULATION  

E-Print Network [OSTI]

Power Mix Fuel Type Net System Power Coal 15% Large Hydroelectric 23% Natural Gas 42% Nuclear 11CALIFORNIA ENERGY COMMISSION APRIL 2003 300-03-002 2002CALIFORNIAPOWERMIX 2002 NET SYSTEM POWER and report net system power, annually (Senate Bill 1305, Sher, Chapter 796, statue of 1997)1 . Net system

398

Columbia Power System | Open Energy Information  

Open Energy Info (EERE)

System System Jump to: navigation, search Name Columbia Power System Place Tennessee Utility Id 3855 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GENERAL POWER RATE From 51 kW to 1,000 kW Commercial GENERAL POWER RATE Up to 50 kW Commercial GENERAL POWER RATE(Demand greater than 1,000 kW not exceeding 5000kW) Commercial General Power Rate(Demand 5001-15000kW) Commercial MANUFACTURING SERVICE POWER RATE DEMAND 5,001-15,000 kW Commercial OUTDOOR LIGHTING STREET, PARKS, & ATHLETIC FIELDS Lighting

399

Wind Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wind Power As the accompanying map of New Mexico shows, the best wind power generation potential near WIPP is along the Delaware Mountain ridge line of the southern Guadalupe...

400

Wind Speed Forecasting for Power System Operation  

E-Print Network [OSTI]

In order to support large-scale integration of wind power into current electric energy system, accurate wind speed forecasting is essential, because the high variation and limited predictability of wind pose profound challenges to the power system...

Zhu, Xinxin

2013-07-22T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Bulk Power Transmission Study  

E-Print Network [OSTI]

, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted...

John, T.

402

Cooling power of quenching oils  

Science Journals Connector (OSTI)

Industrial oils 20 and 20V have the best cooling powers of all quenching oils (used in the USSR). They secure high cooling rates at low temperatures, have a satisfactory...

L. V. Petrash

1959-07-01T23:59:59.000Z

403

Combined Heat and Power System Achieves Millions in Cost Savings...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Achieves Millions in Cost Savings at Large University - Case Study, 2013 Combined Heat and Power System Achieves Millions in Cost Savings at Large University - Case Study, 2013...

404

Rate Schedule CV-RFS4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RFS4 RFS4 (Supersedes Schedule CV-RFS3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR REGULATION AND FREQUENCY RESPONSE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Regulation and Frequency Response Service (regulation). Character and Conditions of Service: Regulation is necessary to provide for the continuous balancing of resources and interchange with load and for maintaining scheduled interconnection frequency at 60-cycles per second. Formula Rate: The formula rate for regulation includes three components:

405

Power options for lunar exploration  

SciTech Connect (OSTI)

This paper presents an overview of the types of power systems available for providing power on the moon. Lunar missions of exploration, in situ resource utilization, and colonization will be constrained by availability of adequate power. The length of the lunar night places severe limitations on solar power system designs, because a large portion of the system mass is devoted to energy storage. The selection of the ideal power source hardware will require compatibility with not only the lunar base power requirements and environment, but also with the conversion, storage, and transmission equipment. In addition, further analysis to determine the optimum operating parameters for a given power system should be conducted so that critical technologies can be identified in the early stages of base development. This paper describes the various concepts proposed for providing power on the lunar surface and compare their ranges of applicability. The importance of a systems approach to the integration of these components will also be discussed.

Bamberger, J.A.; Gaustad, K.L.

1992-01-01T23:59:59.000Z

406

Heat Transfer Enhancement in Thermoelectric Power Generation.  

E-Print Network [OSTI]

??Heat transfer plays an important role in thermoelectric (TE) power generation because the higher the heat-transfer rate from the hot to the cold side of (more)

Hu, Shih-yung

2009-01-01T23:59:59.000Z

407

Nuclear Powers Benefits  

Science Journals Connector (OSTI)

Nuclear Powers Benefits ... Using nuclear power in place of fossil-fuel energy sources, such as coal, has prevented some 1.8 million air-pollution-related deaths and 64 gigatons of carbon emissions globally over the past four decades, a study concludes. ... These estimates suggest policymakers should continue to rely on and expand nuclear power in place of fossil fuels to mitigate climate change, the authors say (Environ. ...

MARK SCHROPE

2013-04-08T23:59:59.000Z

408

Utility Rate Discount | Open Energy Information  

Open Energy Info (EERE)

Discount Discount Jump to: navigation, search A few electric utilities offer rate discounts to encourage residential energy efficiency. For homes that meet certain energy efficiency criteria, such as those established by the federal Energy Star program, the owner or tenant is awarded a percentage discount on each month’s electric bill. [1] Utility Rate Discount Incentives CSV (rows 1 - 14) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Cleco Power - Power Miser New Home Program (Louisiana) Utility Rate Discount Louisiana Residential Building Insulation Central Air conditioners Clothes Washers Comprehensive Measures/Whole Building Doors Duct/Air sealing Furnaces Heat pumps Water Heaters Windows Yes Dominion North Carolina Power - Energy Saver Home Plus (North Carolina) Utility Rate Discount North Carolina Residential Water Heaters

409

Using government purchasing power to reduce equipment standby power  

SciTech Connect (OSTI)

Although the government sector represents only 10 to 15 percent of the economy in most countries, carefully targeted public procurement can play a significant role in market transformation through its influence on both buyers and suppliers. Government leadership in energy-efficient purchasing can set an example for other buyers, while creating opportunities for leading manufacturers and distributors to increase their sales and market share by offering energy-efficient products at competitive prices. Under proper circumstances, a highly visible government purchasing policy can have a disproportionately large influence on the market for efficient products. In the United States, President Bush signed an Executive Order in 2001 directing all federal agencies to buy products with low standby power (1 watt or less where possible). This represents a deliberate choice to use government purchasing - rather than regulations or incentives - as a market-based strategy to encourage energy savings. It also builds upon existing efforts to encourage Federal purchase of energy-efficient products (Energy Star products and others in the top 25th percentile of efficiency). This paper summarizes the Federal Energy Management Program s first 18 months of experience in implementing this Executive Order, including analysis of data on standby power, interactions with manufacturers and industry groups, and the relationship between these efforts and other federal programs concerning product labelling, testing, rating, and efficiency standards. After five years of implementing low-standby power purchasing, we estimate energy savings for federal agencies alone at about 230 GWh/year (worth US$14 million), with spillover effects on the broader market that will save all US consumers nearly 4000 GWh/year (US$300 million).

Harris, Jeffrey; Meier, Alan; Bartholomew, Emily; Thomas, Alison; Glickman, Joan; Ware Michelle

2003-03-03T23:59:59.000Z

410

Energy Storage for the Power Grid  

ScienceCinema (OSTI)

The iron vanadium redox flow battery was developed by researchers at Pacific Northwest National Laboratory as a solution to large-scale energy storage for the power grid.

Wang, Wei; Imhoff, Carl; Vaishnav, Dave

2014-06-12T23:59:59.000Z

411

Entergy Power, Inc | Open Energy Information  

Open Energy Info (EERE)

Rates No Rates Available References "EIA Form EIA-861 Final Data File for 2010 - File1a" Retrieved from "http:en.openei.orgwindex.php?titleEntergyPower,Inc&oldid786765...

412

Columbia Power Coop Assn Inc | Open Energy Information  

Open Energy Info (EERE)

Columbia Power Coop Assn Inc Columbia Power Coop Assn Inc Place Oregon Utility Id 4008 Utility Location Yes Ownership C NERC Location WECC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 175 Watt L Commercial Irrigation, Single-Phase Commercial Irrigation, Three-Phase Commercial Large Commercial Three-Phase Commercial Large Commercial Single-Phase Commercial Residential Single-Phase Residential Residential Three-Phase Residential Security Lighting, New Pole Lighting Security Lighting,Existing Pole Lighting Small Commercial, Single-Phase Commercial Small Commercial, Three-Phase Commercial

413

E-Print Network 3.0 - achievable information rates Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

information rates Search Powered by Explorit Topic List Advanced Search Sample search results for: achievable information rates Page: << < 1 2 3 4 5 > >> 1 Basics Main Result...

414

Extratropical Lapse Rates in Very Hot Climates  

E-Print Network [OSTI]

are neutral with respect to moist convection, and large where lapse rates are stable. Using P* allows us to examine convective motions arising from both gravitational accelerations as well as symmetric instabilities. We assess the ability of current models...

Zamora, Ryan Alexander

2013-07-02T23:59:59.000Z

415

Definition: Electric power | Open Energy Information  

Open Energy Info (EERE)

power power Jump to: navigation, search Dictionary.png Electric power The amount of energy produced per second; the rate at which electric energy is transferred; commonly expressed in megawatts (MW).[1] View on Wikipedia Wikipedia Definition Electric power is the rate at which electric energy is transferred by an electric circuit. The SI unit of power is the watt, one joule per second. Electric power is usually produced by electric generators, but can also be supplied by chemical sources such as electric batteries. Electric power is generally supplied to businesses and homes by the electric power industry. Electric power is usually sold by the kilowatt hour (3.6 MJ) which is the product of power in kilowatts multiplied by running time in hours. View on Reegle Reegle Definition

416

Wind Power: How Much, How Soon, and At What Cost?  

E-Print Network [OSTI]

Evaluation of Global Wind Power." Journal of Geophysical2008. "The Economics of Wind Power with Energy Storage."Economics of Large-Scale Wind Power in a Carbon Constrained

Wiser, Ryan H

2010-01-01T23:59:59.000Z

417

POWER '99 Conference 1 Stochastic Models of Electricity Spot Price  

E-Print Network [OSTI]

spread call options. power spot price delivery at PV gas spot price SoCal system 8000 heat rate When power. When the spot market implied heat rate is below the unit operating heat rate, generator should1 POWER '99 Conference 1 Stochastic Models of Electricity Spot Price and their Applications Shijie

California at Berkeley. University of

418

Definition: Wind power | Open Energy Information  

Open Energy Info (EERE)

Wind power Wind power Jump to: navigation, search Dictionary.png Wind power The amount of power available to a wind turbine depends on: air density, wind speed and the swept area of the rotor. While the power is proportional to air density and swept area, it varies with the cube of wind speed, so small changes in wind speed can have a relatively large impact on wind power.[1] View on Wikipedia Wikipedia Definition Wind power is the conversion of wind energy into a useful form of energy, such as using wind turbines to make electrical power, windmills for mechanical power, windpumps for water pumping or drainage, or sails to propel ships. Large wind farms consist of hundreds of individual wind turbines which are connected to the electric power transmission network. Offshore wind is steadier and stronger than on land, and offshore farms

419

Wind power generating system  

SciTech Connect (OSTI)

Normally feathered propeller blades of a wind power generating system unfeather in response to the actuation of a power cylinder that responds to actuating signals. Once operational, the propellers generate power over a large range of wind velocities. A maximum power generation design point signals a feather response of the propellers so that once the design point is reached no increase in power results, but the system still generates power. At wind speeds below this maximum point, propeller speed and power output optimize to preset values. The propellers drive a positive displacement pump that in turn drives a positive displacement motor of the swash plate type. The displacement of the motor varies depending on the load on the system, with increasing displacement resulting in increasing propeller speeds, and the converse. In the event of dangerous but not clandestine problems developing in the system, a control circuit dumps hydraulic pressure from the unfeathering cylinder resulting in a predetermined, lower operating pressure produced by the pump. In the event that a problem of potentially cladestine consequence arises, the propeller unfeathering cylinder immediately unloads. Upon startup, a bypass around the motor is blocked, applying a pressure across the motor. The motor drives the generator until the generator reaches a predetermined speed whereupon the generator is placed in circuit with a utility grid and permitted to motor up to synchronous speed.

Schachle, Ch.; Schachle, E. C.; Schachle, J. R.; Schachle, P. J.

1985-03-12T23:59:59.000Z

420

Adaptations of renewable energy policies to unstable macroeconomic situationsCase study: Wind power in Brazil  

Science Journals Connector (OSTI)

Despite the massive cost reduction in the last decade, wind power generation is generally still more expensive than conventional energy sources which benefit from the exclusion of externality costs in the price structure. Support policies for renewable energies guarantee the economic viability of this type of electrical power generation in many European countries. In Latin America, Brazil has become the pioneer state for renewable energy with the implementation of the PROINFA programme that supports, among other sources, wind power development of 1100MW. This article presents an overview of the differences between the German and Brazilian wind power promotion policies with a special focus on how PROINFA can be adapted to the unstable macroeconomic situation of Brazil. The document specifically examines the adaptation of wind power promotion policies to large inflation and interest rates in Brazil.

Johannes M. Kissel; Stefan C.W. Krauter

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Delaware's At-large congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

Delaware's At-large congressional district: Energy Resources Delaware's At-large congressional district: Energy Resources Jump to: navigation, search Equivalent URI DBpedia This article is a stub. You can help OpenEI by expanding it. This page represents a congressional district in Delaware. Registered Energy Companies in Delaware's At-large congressional district AstroPower Inc Building Media, Inc. (Du Pont) (Building America Retrofit Alliance) Butamax Advanced Biofuels LLC Citizenre Group Delmarva Power Light Company Delmarva Power DuPont DuPont Biofuels Dupont Fuel Cells Galt Power Inc GlobalWatt Inc Ion Power Inc Naveen Energy Hydra Energy LLC O2Diesel Corporation formerly Dynamic Ventures RNK Capital LLC Sentry Power LLC Sentry Power Technology Textronics Inc Tristabella Consulting LLC University of Delaware Registered Financial Organizations in Delaware's At-large congressional

422

Isolating the decay rate of cosmological gravitational potential  

E-Print Network [OSTI]

The decay rate of cosmological gravitational potential measures the deviation from Einstein-de Sitter universe and can put strong constraints on the nature of dark energy and gravity. Usual method to measure this decay rate is through the integrated Sachs-Wolfe (ISW) effect-large scale structure (LSS) cross correlation. However, the interpretation of the measured correlation signal is complicated by the galaxy bias and matter power spectrum. This could bias and/or degrade its constraints to the nature of dark energy and gravity. But, combining the lensing-LSS cross correlation measurements, the decay rate of gravitational potential can be isolated. For any given narrow redshift bin of LSS, the ratio of the two cross correlations directly measures $[d\\ln D_{\\phi}/d\\ln a]H(z)/W(\\chi,\\chi_s)$, where $D_{\\phi}$ is the linear growth factor of the gravitational potential, $H$ is the Hubble constant at redshift $z$, $W(\\chi,\\chi_s)$ is the lensing kernel and $\\chi$ and $\\chi_s$ are the comoving angular diameter distance to lens and source, respectively. This method is optimal in the sense that (1) the measured quantity is essentially free of systematic errors and is only limited by cosmic variance and (2) the measured quantity only depends on several cosmological parameters and can be predicted from first principles unambiguously. Though fundamentally limited by inevitably large cosmic variance associated with the ISW measurements, it can still put useful independent constraints on the amount of dark energy and its equation of state. It can also provide a powerful test of modified gravity and can distinguish the Dvali-Gabadadze-Porrati model from $\\Lambda$CDM at $>2.5\\sigma$ confidence level.

Pengjie Zhang

2005-12-16T23:59:59.000Z

423

Active Power Controls from Wind Power: Bridging the Gaps  

SciTech Connect (OSTI)

This paper details a comprehensive study undertaken by the National Renewable Energy Laboratory, Electric Power Research Institute, and the University of Colorado to understand how the contribution of wind power providing active power control (APC) can benefit the total power system economics, increase revenue streams, improve the reliability and security of the power system, and provide superior and efficient response while reducing any structural and loading impacts that may reduce the life of the wind turbine or its components. The study includes power system simulations, control simulations, and actual field tests using turbines at NREL's National Wind Technology Center (NWTC). The study focuses on synthetic inertial control, primary frequency control, and automatic generation control, and analyzes timeframes ranging from milliseconds to minutes to the lifetime of wind turbines, locational scope ranging from components of turbines to large wind plants to entire synchronous interconnections, and additional topics ranging from economics to power system engineering to control design.

Ela, E.; Gevorgian, V.; Fleming, P.; Zhang, Y. C.; Singh, M.; Muljadi, E.; Scholbrook, A.; Aho, J.; Buckspan, A.; Pao, L.; Singhvi, V.; Tuohy, A.; Pourbeik, P.; Brooks, D.; Bhatt, N.

2014-01-01T23:59:59.000Z

424

Nuclear Power  

Science Journals Connector (OSTI)

Nuclear Power ... THIS WEEKS issue contains six letters on nuclear power, a representative sample of the letters C&EN received in response to the editorial, Resist Hysteria, I wrote shortly after the earthquake and tsunami in Japan devastated the Fukushima Daiichi Nuclear Power Station (C&EN, March 21, page 5). ... Four of the six letters take sharp issue with the primary point I made in the editorial, which was that, despite the severity of the situation in Japan, nuclear power remains an essential component of our overall energy mix for the near to mid-term because it will help us avert the worst impacts of global climate disruption. ...

RUDY M. BAUM

2011-05-09T23:59:59.000Z

425

Power LCAT  

SciTech Connect (OSTI)

POWER LCAT is a software tool used to compare elements of efficiency, cost, and environmental effects between different sources of energy.

Drennen, Thomas

2012-08-15T23:59:59.000Z

426

Yakama Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration FROM: J.D. Williams Attorney RE: Initial Comments on Draft Load Following Regional Dialogue Contract Template Dear Mark, Please allow these comments...

427

Power LCAT  

ScienceCinema (OSTI)

POWER LCAT is a software tool used to compare elements of efficiency, cost, and environmental effects between different sources of energy.

Drennen, Thomas

2014-06-27T23:59:59.000Z

428

Definition: Equipment Rating | Open Energy Information  

Open Energy Info (EERE)

Rating Rating Jump to: navigation, search Dictionary.png Equipment Rating The maximum and minimum voltage, current, frequency, real and reactive power flows on individual equipment under steady state, short-circuit and transient conditions, as permitted or assigned by the equipment owner.[1] Also Known As Standard current ratings Related Terms reactive power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Rating&oldid=502535" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

429

Analysis of the market for diesel PEM fuel cell auxiliary power units onboard long-haul trucks and of its implications for the large-scale adoption of PEM \\{FCs\\}  

Science Journals Connector (OSTI)

Proton exchange membrane fuel cells (PEM FCs) offer a promising alternative to internal combustion engines in road transport. During the last decade PEM FC research, development and demonstration (RD&D) activities have been steadily increasing worldwide, and targets have been set to begin their commercialisation in road transport by 20152020. However, there still is considerable uncertainty on whether these targets will actually be met. The picture is complex and market and technology issues are closely interlinked; investment in RD&D projects is essential but not sufficient; the development of suitable early markets is also necessary and policy is set to play an important role. Auxiliary power units (APUs) are generally regarded as one important early market for \\{FCs\\} in transport. This paper analyses the possible future market for diesel PEM FC \\{APUs\\} onboard long-haul trucks and its implications for the development of PEM \\{FCs\\} in general. The analysis, part of the project HyTRAN (EC Contract no. 502577), is aided by the use of a dynamic simulation model of technology and markets developed by the author. Results suggest that an interesting window of opportunity for diesel PEM FC \\{APUs\\} exists but this is subject to additional research particularly targeted at the rapid development of fuel processors.

Marcello Contestabile

2010-01-01T23:59:59.000Z

430

Operating the Irish Power System with Increased Levels of Wind Power  

E-Print Network [OSTI]

Operating the Irish Power System with Increased Levels of Wind Power Aidan Tuohy, Student Member-- This paper summarises some of the main impacts of large amounts of wind power installed in the island of Ireland. Using results from various studies performed on this system, it is shown that wind power

431

Discount Power | Open Energy Information  

Open Energy Info (EERE)

Discount Power Discount Power Jump to: navigation, search Name Discount Power Place Texas Utility Id 56360 Utility Location Yes Ownership R NERC ERCOT Yes ISO Ercot Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.0923/kWh Commercial: $0.0735/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Discount_Power&oldid=410585" Categories: EIA Utility Companies and Aliases Utility Companies Organizations

432

Scaling relationship between tree respiration rates and biomass  

Science Journals Connector (OSTI)

...relationship between tree respiration rates and biomass Dong-Liang Cheng 1 * Tao Li 2 Quan-Lin...scaled as the 0.82-power of aboveground biomass M A, and that total respiration rates R T scaled as the 0.85-power of total biomass M T, both of which significantly deviated...

2010-01-01T23:59:59.000Z

433

Solar Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solar Power Solar Power Project Opportunities Abound in the Region The WIPP site is receives abundant solar energy with 6-7 kWh/sq meter power production potential As the accompanying map of New Mexico shows, the WIPP site enjoys abundant year-round sunshine. With an average solar power production potential of 6-7 kWh/sq meter per day, one exciting project being studied for location at WIPP is a 30-50 MW Solar Power Tower: The American Solar Energy Society (ASES) is is a national trade association promoting solar energy as a clean source of electricity, and provides a comprehensive resource for additional information. DOE's Office of Energy Efficiency and Renewable Energy is also a comprehensive resource for more information on renewable energy.

434

Power system  

DOE Patents [OSTI]

A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

Hickam, Christopher Dale (Glasford, IL)

2008-03-18T23:59:59.000Z

435

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

E-Print Network [OSTI]

2002) Economic Impacts of Wind Power in Kittitas County, WA.about Large Offshore Wind Power: Underlying Factors. EnergyOpinion on Offshore Wind Power - Interim Report. University

Hoen, Ben

2010-01-01T23:59:59.000Z

436

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network [OSTI]

large wind power projects, the financing advantage providedestimate how Wind power projects have the advantage of beingall 40 wind power projects, the face value advantage of the

Bolinger, Mark

2012-01-01T23:59:59.000Z

437

Definition: Power | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Definition Edit with form History Facebook icon Twitter icon » Definition: Power Jump to: navigation, search Dictionary.png Power The rate of producing, transferring, or using energy; the amount of energy or work expended in a given amount of time. Power is usually measured in watts.[1][2] View on Wikipedia Wikipedia Definition In physics, power is defined as the amount of energy consumed per unit time. In the MKS system, the unit of power is the joule per second (J/s), known as the watt (in honour of James Watt, the eighteenth-century developer of the steam engine). For example, the rate at which a light bulb

438

Analytical Improvements in PV Degradation Rate Determination  

SciTech Connect (OSTI)

As photovoltaic (PV) penetration of the power grid increases, it becomes vital to know how decreased power output may affect cost over time. In order to predict power delivery, the decline or degradation rates must be determined accurately. For non-spectrally corrected data several complete seasonal cycles (typically 3-5 years) are required to obtain reasonably accurate degradation rates. In a rapidly evolving industry such a time span is often unacceptable and the need exists to determine degradation rates accurately in a shorter period of time. Occurrence of outliers and data shifts are two examples of analytical problems leading to greater uncertainty and therefore to longer observation times. In this paper we compare three methodologies of data analysis for robustness in the presence of outliers, data shifts and shorter measurement time periods.

Jordan, D. C.; Kurtz, S. R.

2011-02-01T23:59:59.000Z

439

Improving energy efficiency via probabilistic rate combination in 802.11 multi-rate wireless networks  

E-Print Network [OSTI]

transmission. An alternative way to conserve energy is to apply power control [1­4]. A wireless node is allowedImproving energy efficiency via probabilistic rate combination in 802.11 multi-rate wireless in revised form 20 January 2009 Accepted 27 January 2009 Available online 6 February 2009 Keywords: Energy

Lui, John C.S.

440

Technology, safety and costs of decommissioning a reference boiling water reactor power station. Volume 1. Main report. Technical report, September 1977-October 1979  

SciTech Connect (OSTI)

Technology, safety and cost information is given for the conceptual decommissioning of a large (1100MWe) boiling water reactor (BWR) power station. Three approaches to decommissioning, immediate dismantlement, safe storage with deferred dismantlement and entombment, were studied to obtain comparisons between costs, occupational radiation doses, potential dose to the public and other safety impacts. It also shows the sensitivity of decommissioning safety and costs to the power rating of a BWR in the range of 200 to 1100 MWE.

Oak, H.D.; Holter, G.M.; Kennedy, W.E. Jr.; Konzek, G.J.

1980-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Cost Study for Large Wind Turbine Blades  

SciTech Connect (OSTI)

The cost study for large wind turbine blades reviewed three blades of 30 meters, 50 meters, and 70 meters in length. Blade extreme wind design loads were estimated in accordance with IEC Class I recommendations. Structural analyses of three blade sizes were performed at representative spanwise stations assuming a stressed shell design approach and E-glass/vinylester laminate. A bill of materials was prepared for each of the three blade sizes using the laminate requirements prepared during the structural analysis effort. The labor requirements were prepared for twelve major manufacturing tasks. TPI Composites developed a conceptual design of the manufacturing facility for each of the three blade sizes, which was used for determining the cost of labor and overhead (capital equipment and facilities). Each of the three potential manufacturing facilities was sized to provide a constant annual rated power production (MW per year) of the blades it produced. The cost of the production tooling and overland transportation was also estimated. The results indicate that as blades get larger, materials become a greater proportion of total cost, while the percentage of labor cost is decreased. Transportation costs decreased as a percentage of total cost. The study also suggests that blade cost reduction efforts should focus on reducing material cost and lowering manufacturing labor, because cost reductions in those areas will have the strongest impact on overall blade cost.

ASHWILL, THOMAS D.

2003-05-01T23:59:59.000Z

442

Strathclyde powerS ahead  

E-Print Network [OSTI]

Strathclyde powerS ahead the future of renewable energy SHARING AND ENHANCING RESEARCH Discover the vision of Principal Professor Jim McDonald THE FUTURE OF ENERGY Strathclyde pioneers renewableEdicinE Snapshot the reSearcher Following a decade of environmental research in her native egypt, nabila saleem

Mottram, Nigel

443

rates | OpenEI  

Open Energy Info (EERE)

rates rates Dataset Summary Description This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011. Source NREL and Ventyx Date Released February 24th, 2012 (2 years ago) Date Updated Unknown Keywords electric rates rates US utilities Data text/csv icon IOU rates by zipcode (csv, 1.7 MiB) text/csv icon Non-IOU rates by zipcode (csv, 2.1 MiB)

444

Power America  

Broader source: Energy.gov [DOE]

Power America will focus on wide bandgap (WBG) semiconductors - the same materials used in LED light fixtures and many flat screen TVs. The Institute will use $70 million provided by the U.S. Department of Energy's Advanced Manufacturing Office to support and manage its programs over the next five years. This Institute is one of three new innovation hubs announced by President Obama in his 2013 State of the Union address and part of the National Network for Manufacturing Innovation (NNMI). Power America was formerly called the Next Generation Power Electronics National Manufacturing Innovation Institute.

445

Wind Powering America Webinar: Wind Power Economics: Past, Present, and  

Broader source: Energy.gov (indexed) [DOE]

Wind Powering America Webinar: Wind Power Economics: Past, Present, Wind Powering America Webinar: Wind Power Economics: Past, Present, and Future Trends Wind Powering America Webinar: Wind Power Economics: Past, Present, and Future Trends November 23, 2011 - 1:43pm Addthis Wind turbine prices in the United States have declined, on average, by nearly one-third since 2008, after doubling from 2002 through 2008. Over this entire period, the average nameplate capacity rating, hub height, and rotor swept area of turbines installed in the United States have increased significantly, while other design improvements have also boosted turbine energy production. In combination, these various trends have had a significant-and sometimes surprising-impact on the levelized cost of energy delivered by wind projects. This webinar will feature three related presentations that explore these

446

Department of Energy Bonneville Power Administration  

E-Print Network [OSTI]

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 and Conservation Council (Council) members have asked that Bonneville Power Administration (Bonneville) make its in the rating process. As you know, the Northwest Power Act obligates Bonneville to use its authorities to fund

447

Combustion powered linear actuator  

DOE Patents [OSTI]

The present invention provides robotic vehicles having wheeled and hopping mobilities that are capable of traversing (e.g. by hopping over) obstacles that are large in size relative to the robot and, are capable of operation in unpredictable terrain over long range. The present invention further provides combustion powered linear actuators, which can include latching mechanisms to facilitate pressurized fueling of the actuators, as can be used to provide wheeled vehicles with a hopping mobility.

Fischer, Gary J. (Albuquerque, NM)

2007-09-04T23:59:59.000Z

448

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Bipolar Nickel Metal Hydride Battery Bipolar Nickel Metal Hydride Battery Development and Testing DOE ENERGY STORAGE SYSTEMS RESEARCH PROGRAM ANNUAL PEER REVIEW November 2 - 3, 2006, Washington, D.C. James Landi jlandi@electroenergyinc.com 203-797-2699 Program Objectives and Benefits  The objective of this program is to further develop the bipolar NiMH battery design to be used in high-energy and high-power energy storage applications. - Build and demonstrate large-format batteries - Demonstrate these batteries in present and future applications  The bipolar NiMH battery could provide the following benefits: - Improve efficiencies by reducing transmission peaking losses and shifting peak demands. - Reduce power and voltage sag to users. - Provide an efficient method to distribute backup energy/power

449

CRSP Power Marketing and Contracts default  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financial Data Environmental Review-NEPA Operations Planning & Projects Power Marketing Rates Financial Data Environmental Review-NEPA Operations Planning & Projects Power Marketing Rates CRSP's Marketing Service Area Power Marketing As a marketer of Federal power, Colorado River Storage Project Management Center's Power Marketing staff provides a variety of services for customers and the utility industry, including long term power purchases and transmission contracts. Energy Services Power Allocations FY2009 & After Current Customer Seasonal Summary (pdf) FY2009 & After New Customer Seasonal Summary (pdf) Post 2004 SHP Energy Determination Documents and Meeting Handouts Customer Meetings & Rate Adjustment Schedule For Long-Term Solution (pdf) GC Lake Elevations Graph - 8/2003 Hydrology Study (pdf) Generation Forecast Graph - 8/2003 Hydrology Study(pdf)

450

Method and device for microwave sintering large ceramic articles  

DOE Patents [OSTI]

A microwave sintering system and method are provided for extremely uniform sintering of large and/or irregular shaped ceramic articles at microwave frequencies of at least 28 GHz in the hundreds of kilowatts power range in an untuned cavity. A 28 GHz, 200 kw gyrotron with variable power output is used as the microwave source connected to an untuned microwave cavity formed of an electrically conductive housing through an overmoded waveguide arrangement which acts in conjunction with a mode promoter within the cavity to achieve unexpected field uniformity. The part to be sintered is placed in the cavity and supported on a removable high temperature table in a central location within the cavity. The part is surrounded by a microwave transparent bulk insulating material to reduce thermal heat loss at the part surfaces and maintain more uniform temperature. The cavity may be operated at a high vacuum to aid in preventing arcing. The system allows controlled increased heating rates of greater than 200.degree. C./min to provide rapid heating of a ceramic part to a selected sintering temperature where it is maintained by regulating the microwave power applied to the part. As a result of rapid heating, the extent of non-isothermal processes such as segregation of impurities to the grain boundaries are minimized and exaggerated grain growth is reduced, thereby strengthening the mechanical properties of the ceramic part being sintered.

Kimrey, Jr., Harold D. (Knoxville, TN)

1990-01-01T23:59:59.000Z

451

Power Struggle  

Science Journals Connector (OSTI)

Disparate forces such as hydraulic fracturing, or fracking, in the U.S.; the phaseout of nuclear power in Germany; and renewable energy promotion in Europe are conspiring to lessen ... ...

ALEX SCOTT

2013-12-09T23:59:59.000Z

452

Historical Interest Rates  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current and Historical Interest Rates Current and Historical Interest Rates The table lists interest rates, from the project's inception through the present, for all projects with repayment supervised by the CRSP MC. The latest available interest rate is used for all future interest rate calculations. The Amistad-Falcon, Collbran, Provo River, and Rio Grande Projects are all assigned the average daily "Yield Rate" calculated by the U.S. Treasury, on an annual basis, for Treasury bonds having terms of 15 years or more remaining to maturity. The calculated yield rate is rounded to the nearest one-eighth of one percent. The yield rate is based upon the bond's interest rate, as well as its market value. The Colorado River Storage Project and its participating projects, Dolores and Seedskadee, are assigned the average daily "Coupon Rate," annualized for the same U.S. Treasury bonds used in "Yield Rate" calculations. The coupon rate is the interest rate that the bond carries upon its face.

453

Cost Analysis Rate Settin  

E-Print Network [OSTI]

Cost Analysis and Rate Settin for Animal Research Facilities #12;#12;Cost Analysis and Rate ... .. . ...................... . . . ................................. . .... 7 Chapter 2 Preparation for Cost Analysis ......................................................... 9 Chapter 3 Assignment of Costs to Animal Research Facility Cost Centers

Baker, Chris I.

454

Power | OpenEI Community  

Open Energy Info (EERE)

78 78 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142287278 Varnish cache server Power Home Water Power Forum Description: Forum for information related to the Water Power Gateway The Water Power Community Forum provides you with a way to engage with other people in the community about the water power topics you care about forum gateway hydro Power Water Syndicate content 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

455

Rate Schedule CV-TPT7  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TPT7 TPT7 (Supersedes Schedule CV-TPT6) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To Western's power service customers who require transmission service by a third party to receive power sold by Western. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points as

456

Economic analysis of solar chimney power plants in Northwest China  

Science Journals Connector (OSTI)

Solar chimney power plant (SCPP) with a long life span is a promising large-scale solar thermal utilization technology. This paper performs an economic analysis for the conventional solar chimney power plant (CSCPP) and the sloped solar chimney power plant (SSCPP) in Northwest China. Cash flows are influenced by many factors including the investment the payback period the inflation rate and the sale price of solar electricity. The techno-economic analyses of the CSCPPs and SSCPPs are performed taking Lanzhou China as a case study. The results show that the SCPP investment is influenced by both its configuration and the material price and the SSCPP is more cost-effective than the CSCPP during the system life span. In addition the SCPP with large power capacity holds good competitiveness with the conventional fossil fuel combustion plants. The economic evaluation of building SCPPs in Northwest China is of high significance considering the local abundant solar radiation favorable government policy and under-developing economics.

Fei Cao; Huashan Li; Liang Zhao; Liejin Guo

2013-01-01T23:59:59.000Z

457

Microsoft PowerPoint - Proceedings Cover Sheets  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Regional Characterization Using a Geographic Information System for Regional Characterization Using a Geographic Information System Weifeng Li 1 , Henry Zhang 1 , Howard J. Herzog 1 , Richard Rhudy 2 1 Laboratory for Energy and the Environment, Massachusetts Institute of Technology, Cambridge, MA 02139; 2 EPRI, 3412 Hillview Ave., Palo Alto, CA 94303 Large Stationary CO 2 Sources Table 2 CO 2 Flow Rate by Plant Types, eastern Texas Plant Type Number of Plants 25-year CO 2 Flow (Mt) Power Plant 98 7,904 Ammonia 1 6 Cement 8 166 Gas Processing 8 82 Refinery 15 771 All sources 130 8,929 Potential Sink List and Capacity: California Oil fields with EOR potential 3.2 Gt Non-EOR sinks Non-EOR oil fields 0.2 Gt Gas fields 1.4 Gt Saline aquifers not available Potential Sink List and Capacity: eastern Texas

458

Delmarva Power (Maryland) | Open Energy Information  

Open Energy Info (EERE)

Maryland) Maryland) Jump to: navigation, search Name Delmarva Power Place Maryland Utility Id 5027 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GENERAL SERVICE - PRIMARY "GS-P" GENERAL SERVICE - TRANSMISSION "GS-T" Commercial LARGE GENERAL SERVICE - SECONDARY "LGS-S" Commercial OUTDOOR LIGHTING "OL" High Pressure Sodium 150W Lighting OUTDOOR LIGHTING "OL" High Pressure Sodium 250W Lighting OUTDOOR LIGHTING "OL" High Pressure Sodium 400W Lighting OUTDOOR LIGHTING "OL" High Pressure Sodium 50W Lighting OUTDOOR LIGHTING "OL" High Pressure Sodium 70W Lighting

459

Shenyang Power Group | Open Energy Information  

Open Energy Info (EERE)

Shenyang Power Group Shenyang Power Group Jump to: navigation, search This article is a stub. You can help OpenEI by expanding it. A Shenyang-based (China) alliance of power companies created to compete on large projects. Controlled by A-Power Energy "SPG is a local power industry alliance based in Shenyang, China, and it was formed early this year under the leadership of A-Power, China`s leading provider of distributed power generation (DG) systems and a fast-growing manufacturer of wind turbines. SPG`s member companies range from power equipment makers to engineering service providers. The alliance was created to integrate local resources and leverage the manufacturing, engineering and government initiatives in the Shenyang area so that SPG can pursue large-scale, international projects in the alternative energy sector. "

460

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Application of Large Application of Large Application of Large - - Scale Scale Energy Storage Systems Energy Storage Systems in AEP in AEP Ali Nourai Distributed Energy Resources American Electric Power EESAT Conference September 2007 Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy (DOE/ESS) through Sandia National Laboratories (SNL). 2 A Possible Future of Distribution A Possible Future of Distribution Energy Storage is a Key to our Future Grid Energy Storage is key to a controlled energy flow on the grid Transmission & Distribution Distribution Substation Commercial Industrial Gensets , FC, LM Gensets , Solar, Fuel Cells (FC), Load Management (LM) Residential Transmission Substation IGCC - FC Hybrid, Biomass, Solar, Nuclear, Direct Carbon FC Bulk Generation

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) Charging Rate  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-in Electric Plug-in Electric Vehicle (PEV) Charging Rate Incentive - Alabama Power to someone by E-mail Share Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) Charging Rate Incentive - Alabama Power on Facebook Tweet about Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) Charging Rate Incentive - Alabama Power on Twitter Bookmark Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) Charging Rate Incentive - Alabama Power on Google Bookmark Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) Charging Rate Incentive - Alabama Power on Delicious Rank Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) Charging Rate Incentive - Alabama Power on Digg Find More places to share Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) Charging Rate Incentive - Alabama Power on

462

Alternative Fuels Data Center: Plug-In Electric Vehicle Charging Rate  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-In Electric Plug-In Electric Vehicle Charging Rate Incentive - Georgia Power to someone by E-mail Share Alternative Fuels Data Center: Plug-In Electric Vehicle Charging Rate Incentive - Georgia Power on Facebook Tweet about Alternative Fuels Data Center: Plug-In Electric Vehicle Charging Rate Incentive - Georgia Power on Twitter Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle Charging Rate Incentive - Georgia Power on Google Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle Charging Rate Incentive - Georgia Power on Delicious Rank Alternative Fuels Data Center: Plug-In Electric Vehicle Charging Rate Incentive - Georgia Power on Digg Find More places to share Alternative Fuels Data Center: Plug-In Electric Vehicle Charging Rate Incentive - Georgia Power on AddThis.com...

463

Rail Coal Transportation Rates  

Gasoline and Diesel Fuel Update (EIA)

Trends, 2001 - 2010 Trends, 2001 - 2010 Transportation infrastructure overview In 2010, railroads transported over 70 percent of coal delivered to electric power plants which are generally concentrated east of the Mississippi River and in Texas. The U.S. railroad market is dominated by four major rail companies that account for 99 percent of U.S. coal rail shipments by volume. Deliveries from major coal basins to power plants by mode Rail Barge Truck Figure 2. Deliveries from major coal basins to power plants by rail, 2010 figure data Figure 3. Deliveries from major coal basins to power plants by barge, 2010 figure data Figure 4. Deliveries from major coal basins to power plants by truck, 2010 figure data The Powder River Basin of Wyoming and Montana, where coal is extracted in

464

Property:IndustrialAvgRate | Open Energy Information  

Open Energy Info (EERE)

IndustrialAvgRate IndustrialAvgRate Jump to: navigation, search Property Name IndustrialAvgRate Property Type Number Description Industrial Average Rate Subproperties This property has the following 279 subproperties: A AEP Generating Company AEP Texas Central Company AEP Texas North Company AES Eastern Energy LP APN Starfirst, L.P. Accent Energy Holdings, LLC Alabama Municipal Elec Authority Alaska Electric & Energy Coop Alaska Energy Authority Alaska Power and Telephone Co Allegheny Electric Coop Inc Alliant Energy Ameren Energy Marketing Ameren Illinois Company American Electric Power Co., Inc. American Mun Power-Ohio, Inc American Samoa Power Authority American Transmission Systems Inc Anoka Electric Coop Appalachian Power Co Aquila Inc Aquila Inc (Missouri) Arizona Electric Pwr Coop Inc

465

Property:CommercialAvgRate | Open Energy Information  

Open Energy Info (EERE)

CommercialAvgRate CommercialAvgRate Jump to: navigation, search Property Name CommercialAvgRate Property Type Number Description Commercial Average Rate Subproperties This property has the following 279 subproperties: A AEP Generating Company AEP Texas Central Company AEP Texas North Company AES Eastern Energy LP APN Starfirst, L.P. Accent Energy Holdings, LLC Alabama Municipal Elec Authority Alaska Electric & Energy Coop Alaska Energy Authority Alaska Power and Telephone Co Allegheny Electric Coop Inc Alliant Energy Ameren Energy Marketing Ameren Illinois Company American Electric Power Co., Inc. American Mun Power-Ohio, Inc American Samoa Power Authority American Transmission Systems Inc Anoka Electric Coop Appalachian Power Co Aquila Inc Aquila Inc (Missouri) Arizona Electric Pwr Coop Inc

466

Butler Public Power District | Open Energy Information  

Open Energy Info (EERE)

Butler Public Power District Butler Public Power District Jump to: navigation, search Name Butler Public Power District Place Nebraska Utility Id 2643 Utility Location Yes Ownership P NERC Location MRO Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial/Industrial Rate 04 Three Phase Commercial Commercial/Industrial Single/Three Phase Rate 06 Industrial Commercial/Industrial with demand Rate 07 Three Phase Industrial Grain Bin Single Phase Rate 08 Commercial Grain Bin Three Phase Rate 09 Commercial Irrigation Services Rate 40 Wheels only Single Phase

467

Power inverters  

DOE Patents [OSTI]

Power inverters include a frame and a power module. The frame has a sidewall including an opening and defining a fluid passageway. The power module is coupled to the frame over the opening and includes a substrate, die, and an encasement. The substrate includes a first side, a second side, a center, an outer periphery, and an outer edge, and the first side of the substrate comprises a first outer layer including a metal material. The die are positioned in the substrate center and are coupled to the substrate first side. The encasement is molded over the outer periphery on the substrate first side, the substrate second side, and the substrate outer edge and around the die. The encasement, coupled to the substrate, forms a seal with the metal material. The second side of the substrate is positioned to directly contact a fluid flowing through the fluid passageway.

Miller, David H. (Redondo Beach, CA); Korich, Mark D. (Chino Hills, CA); Smith, Gregory S. (Woodland Hills, CA)

2011-11-15T23:59:59.000Z

468

Microsoft PowerPoint - Brown_Idaho on Renewable Energy.ppt  

Broader source: Energy.gov (indexed) [DOE]

Policy Options for Policy Options for Renewable Energy Matthew H. Brown Energy Program Director National Conference of State Legislatures matthew.brown@ncsl.org September 2003 Organization The Idaho context Policies for Idaho to consider The Importance of This Committee In general, other bodies of government like the PUC will wait for direction from the legislature on what to do, especially with renewables. The legislature's decisions are critical. Idaho Power Generation Despite the fact that Idaho generation is overwhelmingly hydro, retail power rates have fluctuated considerably in the past five years. This has happened in large part because Idaho utilities have needed to purchase power from more volatile regional power markets. Natural gas prices drive many of these markets.

469

Clean Power at Home  

E-Print Network [OSTI]

this report is to describe and analyze net metering as a mechanism to support the deployment of small-scale, distributed electricity technologies in British Columbia based on renewable energy sources. These are referred to as "distributed renewables" throughout the report. The deployment of distributed renewables offers several environmental, economic, and social benefits that are described in this paper. Net metering enables individual utility customers to connect on-site generation to the utility grid, feeding excess power back to the grid when it is not needed, and utilizing grid power when consumption exceeds local renewable energy supply. In most programs, a single meter measures the customer's net consumption of grid power in a billing period, and they are charged for that consumption under regular retail rates. If production exceeds consumption, the customer's bill is essentially zero. In some instances, utilities may refund customers for excess production in a billing period based on wholesale market prices or avoided production costs. Net metering programs can make self-generation more attractive for customers by eliminating the need to size systems to meet customers' exact power needs or install on-site storage and power conditioning devices. Utilities may, depending upon the type of systems installed, benefit from improvements in local area load factors, and receive credit for various social or environmental benefits of such resources (e.g., greenhouse gas reductions). However, utilities have raised concerns about worker safety (e.g., the possibility that net metering sites may continue to feed electricity into the local distribution grid when the rest of the network is down, putting line workers at risk) and possible financial cross-subsidies from other rate...

May Author Andrew; Andrew E. Pape

470

Karnataka power sector: a case for hydroelectric power  

Science Journals Connector (OSTI)

Karnataka, a southern state in India, flanked by the rich tropical forests of the Western Ghats, has a large potential for hydroelectric power, only a third of which has been harnessed so far. Only about two decades back, this state had surplus power/energy. The state has of late been going through an acute power crisis due to the unplanned growth of industry, unmetered energy supply to the agricultural sector, large losses in transmission, distribution and inefficient utilisation of electrical energy. Stalling of some hydroelectric projects on environmental issue and delaying the completion of some due to shortage of funds have aggravated the crisis. Coal-based thermal generators are already providing 630 MW of power and more are to be installed soon. A 470 MW nuclear generating station is about to be completed. While this drive for increasing power generation is on, the sustainability of this effort from the economic and environmental view point is being seriously questioned. An alternative end-use-oriented approach to energy planning has been proposed which is described as an 'environmentally sound development pathway'. It seems unlikely, however, that this path will be followed to its end, not at least in the near future. A prudent combination of: (a) hydroelectric power generation, large and small, (b) energy conservation and end-use-oriented energy utilisation to the extent feasible, may be the most economically and environmentally suitable option for some time to come - particularly for Karnataka State.

D.P. Sen Gupta

1997-01-01T23:59:59.000Z

471

New Imperial Valley power line  

SciTech Connect (OSTI)

The Imperial Irrigation District placed its new 104-mile, 230kV transmission line in service in the Imperial Valley on September 14, 1988. The power line, with a rated capacity of 600 megawatts, transmits electricity generated at geothermal power plants. The transmission line was financed by 14 geothermal companies, whose participation was based on the amount of line-capacity they expect to use.

Not Available

1988-12-01T23:59:59.000Z

472

Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. |  

Broader source: Energy.gov (indexed) [DOE]

Power Right. Power Smart. Efficient Computer Power Supplies and Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. March 10, 2009 - 6:00am Addthis John Lippert Power supplies convert the AC power that you get from your electric company into the DC power consumed by most electronics, including your computer. We expect our power supplies to be safe, reliable, and durable. If they meet those criteria, then they're all alike, except for cost, right? Well, not exactly. You see, there's one other important feature that sets them apart: efficiency. And I don't know about you, but I believe waste is bad. For me, high efficiency is one important feature that's needed for something to be high quality. So isn't it ridiculous that most power

473

Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. |  

Broader source: Energy.gov (indexed) [DOE]

Power Right. Power Smart. Efficient Computer Power Supplies and Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. Power Right. Power Smart. Efficient Computer Power Supplies and Monitors. March 10, 2009 - 6:00am Addthis John Lippert Power supplies convert the AC power that you get from your electric company into the DC power consumed by most electronics, including your computer. We expect our power supplies to be safe, reliable, and durable. If they meet those criteria, then they're all alike, except for cost, right? Well, not exactly. You see, there's one other important feature that sets them apart: efficiency. And I don't know about you, but I believe waste is bad. For me, high efficiency is one important feature that's needed for something to be high quality. So isn't it ridiculous that most power

474

Tippah Electric Power Assn | Open Energy Information  

Open Energy Info (EERE)

Tippah Electric Power Assn Tippah Electric Power Assn Place Mississippi Utility Id 18943 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GSA 1 General Power Rate 1 Commercial GSA 2 General Power Rate 2 Commercial GSA 3 General Power Rate 3 Commercial LS Lighting High Pressure Sodium 100 Watts Lighting LS Lighting Mercury Vapor 175 Watts Lighting LS Lighting Mercury Vapor 400 Watts Lighting LS Lighting Metal Halide Cobrahead 400 Watts Lighting LS Lighting Metal Halide Floodlight 1000 Watts Lighting

475

PowerChoice Residential Customer Response to TOU Rates  

E-Print Network [OSTI]

Monitor uses four batteries, which need to be replaced everyversus wired models, batteries used only for display so aspermanent locations and the batteries appear to wear out in

Peters, Jane S.

2010-01-01T23:59:59.000Z

476

Rail Coal Transportation Rates to the Electric Power Sector  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

well as other details about the shipment. A waybill can include one or more cars and a train can include one or more waybills. Unlike most other reports with coal transportation...

477

Coal Transportation Rates to the Electric Power Sector  

Gasoline and Diesel Fuel Update (EIA)

Survey data. Each plant receiving CAPP or PRB coal in 2007 and 2010 were mapped and their data used to estimate costs for other cells by interpolating values based on inverse...

478

PowerChoice Residential Customer Response to TOU Rates  

E-Print Network [OSTI]

and install a wireless electricity-use feedback monitor. 65wireless energy monitor that provides information on near- instantaneous, as well as cumulative, electricity

Peters, Jane S.

2010-01-01T23:59:59.000Z

479

PowerChoice Residential Customer Response to TOU Rates  

E-Print Network [OSTI]

Electricity Consumption .1984. Time-of-Day Electricity Consumption Response toon Residential Electricity Consumption: The Hydro One Pilot.

Peters, Jane S.

2010-01-01T23:59:59.000Z

480

PowerChoice Residential Customer Response to TOU Rates  

E-Print Network [OSTI]

or pin based compact fluorescent bulbs. If asked, count both15. How many compact fluorescent bulbs have you installedregular fixtures with fluorescent bulbs? Installing timers

Peters, Jane S.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "large power rate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Error rate and power dissipation in nano-logic devices  

E-Print Network [OSTI]

has two single electron junctions and one Coulomb island (or quantum dot). Single electron junction is ultrasmall junction at which single electron tunneling is observed. The single electron tunneling has been observed in granular metallic structure... since the 1950s. A granular metallic structure is thought of as a structure consisting of source, ultrasmall grain called Coulomb island, and drain, like single electron transistor. They are separated by insulator. The single electron tunneling...

Kim, Jong Un

2012-06-07T23:59:59.000Z

482

Error rate and power dissipation in nano-logic devices  

E-Print Network [OSTI]

) ________________________ ___________________ Edgar Sanchez-Sinencio Mosong Cheng (Member) (Member...) ________________________ ___________________ Edgar Sanchez-Sinencio Mosong Cheng (Member) (Member...

Kim, Jong Un

2005-08-29T23:59:59.000Z

483

Southwestern Power Administration One West Third Street  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

15 2012 15 2012 NOTICE OF ORDER CONFIRMING AND APPROVING ROBERT DOUGLAS WILLIS POWER RATE ON AN INTERIM BASIS You are hereby notified, in accordance with the terms and conditions of the Robert Douglas Willis Hydropower Project power sales contract No. DE-PM75-85SW00117, that the Deputy Secretary of Energy under DOE Delegation Order Nos. 00-037.00 and 00-001-00D, effective December 6, 2001, and January 22, 2010, respectively, has approved the Robert Douglas Willis Rate Schedule, RDW-12, on an interim basis for the period October 1, 2012, through September 30, 2016. This annual power rate of $1,072,332 ($89,361 per month) is applicable to sales of power and energy under the terms of the contract mentioned above between Southwestern Power Administration and the Sam Rayburn Municipal Power Agency.

484

Large-eddy simulation of offshore wind farm  

Science Journals Connector (OSTI)

A hybrid numerical capability is developed for the simulation of offshore wind farms in which large-eddy simulation is performed for the wind turbulence and a potential flow based method is used for the simulation of the ocean wave field. The wind and wave simulations are dynamically coupled. The effect of wind turbines on the wind field is represented by an actuator disk model. This study focuses on the effect of wind-seas and the turbine motion is treated as negligibly small. A variety of fully-developed and fetch-limited wind-sea conditions and turbine spacings are considered in the study. Statistical analyses are performed for the simulation results with a focus on the mean wind profile kinetic energy budget in the wind field and the wind turbine power extraction