Sample records for land assessment act

  1. Land Reclamation Act (Missouri)

    Broader source: Energy.gov [DOE]

    It is the policy of the state to balance surface mining interests with the conservation of natural resources and land preservation. This Act authorizes the Land Reclamation Commission of the...

  2. Delaware Land Protection Act (Delaware)

    Broader source: Energy.gov [DOE]

    The Land Protection Act requires the Department of Natural Resources and Environmental Control to work with the Delaware Open Space Council to develop standards and criteria for determining the...

  3. Pennsylvania Farmland and Forest Land Assessment Act of 1974- Utilization of Land or Conveyance of Rights for Exploration or Extraction of Gas, Oil or Coal Bed Methane

    Broader source: Energy.gov [DOE]

    This act prescribes the procedure utilization of land or conveyance of rights for exploration or extraction of gas, oil or coal bed methane in agricultural and forest reserve areas.

  4. Hierarchical Marginal Land Assessment for Land Use Planning

    SciTech Connect (OSTI)

    Kang, Shujiang [ORNL; Post, Wilfred M [ORNL; Wang, Dali [ORNL; Nichols, Dr Jeff A [ORNL; Bandaru, Vara Prasad [ORNL

    2013-01-01T23:59:59.000Z

    Marginal land provides an alternative potential for food and bioenergy production in the face of limited land resources; however, effective assessment of marginal lands is not well addressed. Concerns over environmental risks, ecosystem services and sustainability for marginal land have been widely raised. The objective of this study was to develop a hierarchical marginal land assessment framework for land use planning and management. We first identified major land functions linking production, environment, ecosystem services and economics, and then classified land resources into four categories of marginal land using suitability and limitations associated with major management goals, including physically marginal land, biologically marginal land, environmental-ecological marginal land, and economically marginal land. We tested this assessment framework in south-western Michigan, USA. Our results indicated that this marginal land assessment framework can be potentially feasible on land use planning for food and bioenergy production, and balancing multiple goals of land use management. We also compared our results with marginal land assessment from the Conservation Reserve Program (CRP) and land capability classes (LCC) that are used in the US. The hierarchical assessment framework has advantages of quantitatively reflecting land functions and multiple concerns. This provides a foundation upon which focused studies can be identified in order to improve the assessment framework by quantifying high-resolution land functions associated with environment and ecosystem services as well as their criteria are needed to improve the assessment framework.

  5. Coastal Public Lands Management Act (Texas)

    Broader source: Energy.gov [DOE]

    The coastal public lands of the state are managed in accordance with the following principles: (a) The natural resources of the surface land, including their aesthetic value and their ability to...

  6. Outer Continental Shelf Lands Act | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany OilInformationPre-TaxShelf Lands Act Jump to:

  7. An Act to Reform Land Use Planning in the Unorganized Territory (Maine)

    Broader source: Energy.gov [DOE]

    An Act to Reform Land Use Planning in the Unorganized Territory alters the makeup and responsibilities of Maine's Land Use Regulation Commission (LURC). It took effect on August 29, 2012 and...

  8. MSU Departmental Assessment Plan Department: Land Resources and Environmental Sciences

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    MSU Departmental Assessment Plan 2007-2009 Department: Land Resources and Environmental Sciences (cross-college) #12;Student Outcomes Assessment Plan Land Resources and Environmental Sciences Department The Department of Land Resources and Environmental Sciences (LRES) will undertake a continuing assessment

  9. Iowa Land Recycling and Environmental Remediation Standards Act (Iowa)

    Broader source: Energy.gov [DOE]

    This chapter establishes remediation standards for land, other than standards for water quality, hazardous conditions, underground storage tanks, and groundwater protection, which are discussed in...

  10. Land Reclamation and the Resource Extraction Reclamation Act (Florida)

    Broader source: Energy.gov [DOE]

    The Department of Environmental Protection's Mining Program is responsible for enacting and implementing regulations pertaining to land reclamation. The program primarily focuses on the reclamation...

  11. Is Florida's Growth Management Act protecting agricultural lands?

    E-Print Network [OSTI]

    Lloyd, Stephen (Stephen Charles Rhys)

    2011-01-01T23:59:59.000Z

    Florida has experienced more population growth over the past half century than any other state, which has led to some of the most extensive urban development on valuable agricultural lands. To address this and other impacts ...

  12. MSU Departmental Assessment Plan Department: Land Resources and Environmental Sciences

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    MSU Departmental Assessment Plan 2009-2010 Department: Land Resources and Environmental Sciences: Ecology and Environmental Sciences (cross-college) #12;Student Outcomes Assessment Plan Land Resources Department Head: Tracy M. Sterling Assessment Coordinator: Cathy Zabinski Degrees/Majors/Options Offered

  13. Vermont Land Use and Development, Act 250 (Vermont)

    Broader source: Energy.gov [DOE]

    The Act 250 program provides a public, quasi-judicial process for reviewing and managing the environmental consequences of major developments in Vermont. The program is implemented through 9...

  14. Montana Ground Water Assessment Act (Montana)

    Broader source: Energy.gov [DOE]

    This statute establishes a program to systematically assess and monitor the state's ground water and to disseminate the information to interested persons in order to improve the quality of ground...

  15. Land Use Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |Jilin Zhongdiantou NewKorea PartsLLNLLaizhouLand O Lakes Inc

  16. Sustainable Land-use Impact Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit with formSoutheastern ILSunseeker Energy HoldingEnergyLand-use Impact Assessment

  17. Research priorities in land use and land-cover change for the Earth system and integrated assessment modelling

    E-Print Network [OSTI]

    Hibbard, Kathy; Janetos, Anthony; van Vuuren, Detlef P.; Pongtatz, Julia; Rose, Steven K.; Betts, Richard; Herold, Martin; Feddema, Johannes J.

    2010-01-01T23:59:59.000Z

    ). Copyright ? 2010 Royal Meteorological Society and Crown Copyright. KEY WORDS land use; land cover; Earth system models; integrated assessment models; research priorities Received 12 January 2009; Revised 9 March 2010; Accepted 14 March 2010 1. Introduction 1... biogeophysical, socio- economic and human decision-making perspectives. The Earth System Modeling (ESM) and the Integrated Assessment Modeling (IAM) communities play an impor- tant role in understanding and quantifying Earth system analysis and, specifically...

  18. National Environmental Policy Act Hazards Assessment for the TREAT Alternative

    SciTech Connect (OSTI)

    Boyd D. Christensen; Annette L. Schafer

    2014-02-01T23:59:59.000Z

    This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

  19. National Environmental Policy Act Hazards Assessment for the TREAT Alternative

    SciTech Connect (OSTI)

    Boyd D. Christensen; Annette L. Schafer

    2013-11-01T23:59:59.000Z

    This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

  20. Preliminary assessment of the impacts of deep foundations and land reclamation on groundwater flow

    E-Print Network [OSTI]

    Jiao, Jiu Jimmy

    Preliminary assessment of the impacts of deep foundations and land reclamation on groundwater flow are increasing. Land reclamation from the sea and high-rise buildings are common approaches to satis- fying in a groundwater system due to land reclamation and con- struction of building foundations in a coastal area

  1. Assessing Naturalness in Northern Great Lakes Forests Based on Historical Land-Cover and Vegetation Changes

    E-Print Network [OSTI]

    was developed to assess to what degree landscapes represent a natural state. Protected areas are often regarded Land-use history Á Land-use change Á Naturalness Á Logging Á Great Lakes Á Protected areas Introduction the question to what degree protected areas represent a natural state. To assess this question conservation

  2. FINAL REPORT: An Integrated Inter-temporal Analysis of Land Use Change in Forestry and Agriculture: An Assessment of the Influence of Technological Change on Carbon Sequestration and Land Use.

    SciTech Connect (OSTI)

    Brent Sohngen

    2008-10-30T23:59:59.000Z

    This project built a global land use model to examine the implications of land based carbon sequestration on land uses. The model also can be used to assess the costs of different land-based actions to reduce carbon emissions.

  3. Thinking globally - acting locally an energy company`s response to land stewardship

    SciTech Connect (OSTI)

    McIntyre, D. [Sasaki Associates, Inc., Watertown, MA (United States)

    1995-12-01T23:59:59.000Z

    This paper explores the application of contemporary land use planning principles in the Kingdom of Saudi Aramco, the world`s largest oil company, relative to Company-controlled land located in the Eastern Province of the Kingdom. The Eastern Province is the world`s most productive hydrocarbon resource. The Province has witnessed extraordinary industrialization over 25 years due to the exploitation of the oil resource. Saudi Aramco commissioned the planning study to set a course of action which fully considers the consequences such development may have on the social, economic and environmental characteristics of the metropolitan area. In addition to existing developed areas, the study area encompasses a unique desert environment including salts flats, native vegetation, habitat for migrating wildlife and extraordinary geologic formations overlying an important water resource. A Master Plan established a framework of land use, open space, transportation and infrastructure to guide the development of the region over the next 25 years. The Plan emphasizes the redevelopment of industrialized areas for other uses leveraging capital investment to improve quality of the built environment and establishes institutional mechanisms necessary to fully achieve implementation. The study is innovative because (1) a global energy company assumes a leadership role in stewarding its land resource, (2) incorporates contemporary land use planning techniques within a context where such planning is absent, (3) emphasizes redevelopment of industrialized areas, where historically development has simply been directed to the next available undeveloped site, and (4) applies the principles of sustainable land use planning by responding to cultural influences, strengthening local economies and preserving important natural assets. The study establishes a precendent for {open_quotes}corporate environmentalism{close_quotes}and offers a model approach to land use planning in the developing world.

  4. Assessment of Biomass Resources from Marginal Lands in APEC Economies

    SciTech Connect (OSTI)

    Milbrandt, A.; Overend, R. P.

    2009-08-01T23:59:59.000Z

    The goal of this study is to examine the marginal lands in Asia-Pacific Economic Cooperation (APEC) economies and evaluate their biomass productivity potential. Twelve categories of marginal lands are identified using the Global Agro-Ecological Zones system of the United Nations Food and Agriculture Organization.

  5. Assessing land conservation strategies : the case of the Florida Everglades

    E-Print Network [OSTI]

    Lassiter, Allison (Allison Blythe)

    2009-01-01T23:59:59.000Z

    South Florida's Everglades is home to 67 threatened and endangered species. By 2100 it is estimated that sea level rise will inundate over 20% of existing conservation lands. Species will be dislocated and migrate to new ...

  6. Biological assessment for the transfer of the DP land tract

    SciTech Connect (OSTI)

    Keller, D.C.

    1996-10-01T23:59:59.000Z

    The Department of Energy (DOE) is proposing to transfer to the County of Los Alamos up to 10-ha (25-ac) of federal land located in Technical Area-21 to be developed for commercial uses. Previous studies for the proposed land transfer area indicate that potential habitat for four threatened, endangered, and sensitive species occurs in or adjacent to the proposed land transfer area. These include the northern goshawk (federal species of concern), Mexican spotted owl (federal threatened), the spotted bat (federal species of concern, state threatened), die peregrine falcon (federal endangered, state endangered), and the. In order to determine the possible influences of the land transfer on these organisms, information from species-specific surveys was collected. These surveys were used to confirm the presence of these species or to infer their absence in or near the project area. It was concluded that none of die above mentioned species occur in the project area. Stretches of the stream channel within Los Alamos Canyon have been identified as palustrine and riverine, temporarily flooded wetlands. The proposed land transfer should not affect these wetlands.

  7. PM Update - Steve Meador, Acting Dir for Proj Assessment-SC,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jack Surash, Dep Asst Secretary for APM-EM, Bob Raines, Assoc. Administrator for APM-NNSA PM Update - Steve Meador, Acting Dir for Proj Assessment-SC, Jack Surash, Dep Asst...

  8. Smith Lever Act Cooperative extension work between the Land-Grant Colleges and the United State

    E-Print Network [OSTI]

    Tullos, Desiree

    States useful and practical information on subjects relating to agriculture, uses of solar energy of this Act, the term "solar energy" means energy derived from sources (other than fossil fuels of instruction and practical demonstrations in agriculture, uses of solar energy and home economics, and subjects

  9. Assessing the displacement goals in the Energy Policy Act

    SciTech Connect (OSTI)

    Santini, D.J.; Krinke, M.; Mintz, M.; Singh, M.

    1995-02-01T23:59:59.000Z

    This paper discusses studies required by sections 502 and 504 of the Energy Policy Act of 1992 (EPACT). The principal focus is the feasibility of achieving the percentage reduction in petroleum-based transportation fuels used by light-duty vehicles (10% in 2000, 30% in 2010) as required by section 502(b)(2). The percentage goals must be consistent with the general goals of section 502(a), which include reducing oil imports, reducing greenhouse gases, and improving the nation`s economy. This paper draws upon conditional projections of replacement-fuel use in two separate 1994 studies conducted by the U.S. Department of Energy`s Energy Information Administration and its Office of Transportation Technologies. By referring to these published results and their context, this paper identifies key issues that must be considered in an evaluation of various section 502 goals as required by section 504(a).

  10. Final Report, Wind Power Resource Assessment on the Warm Springs Reservation Tribal Lands, Report No. DOE/GO/12103

    SciTech Connect (OSTI)

    Jim Manion, Warm Springs Power & Water Enterprises; David McClain, McClain & Associates; HDR Engineering; Dr. Stel Walker, Oregon State University

    2007-09-10T23:59:59.000Z

    This report concludes a five-year assessment of wind energy potential on the Confederated Tribes of Warm Springs Reservation of Oregon lands.

  11. Renewable Energy Assessment of Bureau of Reclamation Land and Facilities Using Geographic Information Systems

    SciTech Connect (OSTI)

    Heimiller, D.; Haase, S.; Melius, J.

    2013-05-01T23:59:59.000Z

    This report summarizes results of geographic information system screening for solar and wind potential at select Bureau of Reclamation lands in the western United States. The study included both utility-scale and facility-scale potential. This study supplements information in the report titled Renewable Energy Assessment for the Bureau of Reclamation: Final Report.

  12. FRONTAGE ROADS: AN ASSESSMENT OF LEGAL ISSUES, DESIGN DECISIONS, COSTS, OPERATIONS, AND LAND-DEVELOPMENT DIFFERENCES

    E-Print Network [OSTI]

    Kockelman, Kara M.

    FRONTAGE ROADS: AN ASSESSMENT OF LEGAL ISSUES, DESIGN DECISIONS, COSTS, OPERATIONS, AND LAND with lower household incomes, lower population densities, lower percentages of bike trips to work, lower in constructing a solid, formal policy for all states and regions to follow in providing access along new

  13. Resource Assessment and Land Use Change | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy usingof Enhanced Dr. Julia PhillipsResource Assessment and

  14. Coupling GIS and LCA for biodiversity assessments of land use: Part 2: Impact assessment

    E-Print Network [OSTI]

    Geyer, Roland; Lindner, Jan P.; Stoms, David M.; Davis, Frank W.; Wittstock, Bastian

    2010-01-01T23:59:59.000Z

    ignored in life cycle assessment (LCA). Some productionexplicit manner, while life cycle assessment (LCA) does notuse impacts in life cycle assessment. Int J LCA 11(5):363–

  15. A state-impact-state methodology for assessing environmental impact in land use planning

    SciTech Connect (OSTI)

    Chen, Longgao [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); Yang, Xiaoyan [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Chen, Longqian, E-mail: cumt_chenlongqian@163.com [School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Potter, Rebecca; Li, Yingkui [Department of Geography, University of Tennessee, Knoxville, TN 37996 (United States)

    2014-04-01T23:59:59.000Z

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level.

  16. Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).

    SciTech Connect (OSTI)

    Krummel, J.; Hlohowskyj, I.; Kuiper, J.; Kolpa, R.; Moore, R.; May, J.; VanKuiken, J.C.; Kavicky, J.A.; McLamore, M.R.; Shamsuddin, S. (Decision and Information Sciences); ( EVS)

    2011-09-01T23:59:59.000Z

    On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridor

  17. An international land-biosphere model benchmarking activity for the IPCC Fifth Assessment Report (AR5)

    SciTech Connect (OSTI)

    Hoffman, Forrest M [ORNL; Randerson, James T [ORNL; Thornton, Peter E [ORNL; Bonan, Gordon [National Center for Atmospheric Research (NCAR); Erickson III, David J [ORNL; Fung, Inez [University of California, Berkeley

    2009-12-01T23:59:59.000Z

    The need to capture important climate feedbacks in general circulation models (GCMs) has resulted in efforts to include atmospheric chemistry and land and ocean biogeochemistry into the next generation of production climate models, called Earth System Models (ESMs). While many terrestrial and ocean carbon models have been coupled to GCMs, recent work has shown that such models can yield a wide range of results (Friedlingstein et al., 2006). This work suggests that a more rigorous set of global offline and partially coupled experiments, along with detailed analyses of processes and comparisons with measurements, are needed. The Carbon-Land Model Intercomparison Project (C-LAMP) was designed to meet this need by providing a simulation protocol and model performance metrics based upon comparisons against best-available satellite- and ground-based measurements (Hoffman et al., 2007). Recently, a similar effort in Europe, called the International Land Model Benchmark (ILAMB) Project, was begun to assess the performance of European land surface models. These two projects will now serve as prototypes for a proposed international land-biosphere model benchmarking activity for those models participating in the IPCC Fifth Assessment Report (AR5). Initially used for model validation for terrestrial biogeochemistry models in the NCAR Community Land Model (CLM), C-LAMP incorporates a simulation protocol for both offline and partially coupled simulations using a prescribed historical trajectory of atmospheric CO2 concentrations. Models are confronted with data through comparisons against AmeriFlux site measurements, MODIS satellite observations, NOAA Globalview flask records, TRANSCOM inversions, and Free Air CO2 Enrichment (FACE) site measurements. Both sets of experiments have been performed using two different terrestrial biogeochemistry modules coupled to the CLM version 3 in the Community Climate System Model version 3 (CCSM3): the CASA model of Fung, et al., and the carbon-nitrogen (CN) model of Thornton. Comparisons of the CLM3 offline results against observational datasets have been performed and are described in Randerson et al. (2009). CLM version 4 has been evaluated using C-LAMP, showing improvement in many of the metrics. Efforts are now underway to initiate a Nitrogen-Land Model Intercomparison Project (N-LAMP) to better constrain the effects of the nitrogen cycle in biosphere models. Presented will be new results from C-LAMP for CLM4, initial N-LAMP developments, and the proposed land-biosphere model benchmarking activity.

  18. Assessment of Stormflow and Water Quality from Undisturbed and Site Prepared Forest Land in East Texas (Interim Report)

    E-Print Network [OSTI]

    DeHaven, M. G.; Blackburn, W. H.; Knight, R. W.; Weichert, A. T.

    TR- 117 1981 Assessment of Stormflow and Water Quality from Undisturbed and Site Prepared Forest Land in East Texas, Interim Report M.G. DeHaven W.H. Blackburn R.W. Knight A.T. Weichert...

  19. Joint environmental assessment 1997--2001 of the California Department of Food and Agriculture Curly Top Virus Control Program for Bureau of Land Management and Department of Energy

    SciTech Connect (OSTI)

    NONE

    1997-03-01T23:59:59.000Z

    The DOE, Naval Petroleum reserves in California (NPRC), proposes to sign an Amendment to the Cooperative Agreement and Supplement with the California Department of Food and Agriculture (CDFA) to extend the term of the Curly Top Virus Control Program (CTVCP) in California. This program involves Malathion spraying on NPRC lands to control the beet leafhopper, over a five year period from 1997 through 2001. It is expected that approximately 330 acres on Naval Petroleum Reserve Number 1 (NPR-1) and approximately 9,603 acres on Naval Petroleum Reserve Number 2 (NPR-2) will be treated with Malathion annually by CDFA during the course of this program. The actual acreage subject to treatment can vary from year to year. Pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as amended, the potential impacts of the proposed action were analyzed in a Joint Environmental Assessment (DOE/EA-1011) with the US Department of Interior, Bureau of Land Management (BLM) acting as lead agency, in consultation with the CDFA, and the DOE acting as a cooperating agency. Based on the analysis in the EA, DOE has determined that the conduct of the Curly Top Virus Control Program in California is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the NEPA. Therefore, the preparation of an Environmental Impact Statement is not required and DOE is consequently issuing a FONSI.

  20. An Assessment of Land Availability and Price in the Coterminous United States for Conversion to Algal Biofuel Production

    SciTech Connect (OSTI)

    Venteris, Erik R.; Skaggs, Richard; Coleman, Andre M.; Wigmosta, Mark S.

    2012-12-01T23:59:59.000Z

    Realistic economic assessment of land-intensive alternative energy sources (e.g., solar, wind, and biofuels) requires information on land availability and price. Accordingly, we created a comprehensive, national-scale model of these parameters for the United States. For algae-based biofuel, a minimum of 1.04E+05 km2 of land is needed to meet the 2022 EISA target of 2.1E+10 gallons year-1. We locate and quantify land types best converted. A data-driven model calculates the incentive to sell and a fair compensation value (real estate and lost future income). 1.02E+6 km2 of low slope, non-protected land is relatively available including croplands, pasture/ grazing, and forests. Within this total there is 2.64E+5 km2 of shrub and barren land available. The Federal government has 7.68E+4 km2 available for lease. Targeting unproductive lands minimizes land costs and impacts to existing industries. However, shrub and barren lands are limited by resources (water) and logistics, so land conversion requires careful consideration.

  1. Coupling GIS and LCA for biodiversity assessments of land use: Part 2: Impact assessment

    E-Print Network [OSTI]

    Geyer, Roland; Lindner, Jan P.; Stoms, David M.; Davis, Frank W.; Wittstock, Bastian

    2010-01-01T23:59:59.000Z

    Biodiversity impacts . Bioethanol . Evenness . Geographicto produce a liter of bioethanol depends on where thethen assessed for three bioethanol feedstocks at different

  2. The Initial Environmental Assessments for the Nuclear Waste Repository under Section 112 of the Nuclear Waste Policy Act

    E-Print Network [OSTI]

    Montange, Charles H.

    1985-01-01T23:59:59.000Z

    NWPA. See note 139 supra. NUCLEAR WASTE ASSESSMENTS cess orof the program. If the Nuclear Waste Policy Act is to work,potentially acceptable for nuclear waste repositories was

  3. Integrated Assessment Modeling of Carbon Sequestration and Land Use Emissions Using Detailed Model Results and Observations

    SciTech Connect (OSTI)

    Dr. Atul Jain

    2005-04-17T23:59:59.000Z

    This report outlines the progress on the development and application of Integrated Assessment Modeling of Carbon Sequestrations and Land Use Emissions supported by the DOE Office of Biological and Environmental Research (OBER), U.S. Department of Energy, Grant No. DOE-DE-FG02-01ER63069. The overall objective of this collaborative project between the University of Illinois at Urbana-Champaign (UIUC), Oak Ridge National Laboratory (ORNL), Lawrence Livermore National Laboratory (LLNL), and Pacific Northwest National Laboratory (PNNL) was to unite the latest advances in carbon cycle research with scientifically based models and policy-related integrated assessment tools that incorporate computationally efficient representations of the latest knowledge concerning science and emission trajectories, and their policy implications. As part of this research we accomplished the following tasks that we originally proposed: (1) In coordination with LLNL and ORNL, we enhanced the Integrated Science Assessment Model's (ISAM) parametric representation of the ocean and terrestrial carbon cycles that better represent spatial and seasonal variations, which are important to study the mechanisms that influence carbon sequestration in the ocean and terrestrial ecosystems; (2) Using the MiniCAM modeling capability, we revised the SRES (IPCC Special Report on Emission Scenarios; IPCC, 2000) land use emission scenarios; and (3) On the application front, the enhanced version of ISAM modeling capability is applied to understand how short- and long-term natural carbon fluxes, carbon sequestration, and human emissions contribute to the net global emissions (concentrations) trajectories required to reach various concentration (emission) targets. Under this grant, 21 research publications were produced. In addition, this grant supported a number of graduate and undergraduate students whose fundamental research was to learn a disciplinary field in climate change (e.g., ecological dynamics and ocean circulations) and then complete research on how this field could be linked to the other factors we need to consider in its dynamics (e.g., land use, ocean and terrestrial carbon sequestration and climate change).

  4. Preliminary assessment of future refining impacts of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Hadder, G.R.

    1991-09-01T23:59:59.000Z

    A preliminary assessment of the future refining impacts of the Clean Air Act Amendments of 1990 has been performed with the Navy Mobility Fuels Forecasting Systems. The assessment suggests that gasoline reformulation costs in domestic coastal and near-coastal refining regions in the year 2000 could be 3.5 to 5.6 cents per gallon (in terms of 1989 currency). For heating value equivalent to one gallon of conventional gasoline, the regional total added costs (including reformulation costs) for reformulated gasoline could be 5.9 to 8.0 cents. In blending reformulated gasolines, the reduction of butane for lower Reid vapor pressure and the reduction of reformate for lower aromatics are generally compensated by increased percentages of alkylate and/or straight run naphthas. Relatively larger refinery process capacity additions are required for butane isomerization, alkylation, aromatics recovery, and distillate hydrotreating. 21 refs., 3 figs., 18 tabs.

  5. From land use to land cover: Restoring the afforestation signal in a coupled integrated assessment - earth system model and the implications for CMIP5 RCP simulations

    SciTech Connect (OSTI)

    Di Vittorio, Alan; Chini, Louise M.; Bond-Lamberty, Benjamin; Mao, Jiafu; Shi, Xiaoying; Truesdale, John E.; Craig, Anthony P.; Calvin, Katherine V.; Jones, Andrew D.; Collins, William D.; Edmonds, James A.; Hurtt, George; Thornton, Peter E.; Thomson, Allison M.

    2014-11-27T23:59:59.000Z

    Climate projections depend on scenarios of fossil fuel emissions and land use change, and the IPCC AR5 parallel process assumes consistent climate scenarios across Integrated Assessment and Earth System Models (IAMs and ESMs). To facilitate consistency, CMIP5 used a novel land use harmonization to provide ESMs with seamless, 1500-2100 land use trajectories generated by historical data and four IAMs. However, we have identified and partially addressed a major gap in the CMIP5 land coupling design. The CMIP5 Community ESM (CESM) global afforestation is only 22% of RCP4.5 afforestation from 2005 to 2100. Likewise, only 17% of the Global Change Assessment Model’s (GCAM’s) 2040 RCP4.5 afforestation signal, and none of the pasture loss, were transmitted to CESM within a newly integrated model. This is a critical problem because afforestation is necessary for achieving the RCP4.5 climate stabilization. We attempted to rectify this problem by modifying only the ESM component of the integrated model, enabling CESM to simulate 66% of GCAM’s afforestation in 2040, and 94% of GCAM’s pasture loss as grassland and shrubland losses. This additional afforestation increases vegetation carbon gain by 19 PgC and decreases atmospheric CO2 gain by 8 ppmv from 2005 to 2040, implying different climate scenarios between CMIP5 GCAM and CESM. Similar inconsistencies likely exist in other CMIP5 model results, primarily because land cover information is not shared between models, with possible contributions from afforestation exceeding model-specific, potentially viable forest area. Further work to harmonize land cover among models will be required to adequately rectify this problem.

  6. President Abraham Lincoln signs Morrill Act, paving way for the creation of land-grant colleges focusing on agriculture

    E-Print Network [OSTI]

    for the creation of land-grant colleges focusing on agriculture and mechanical arts MARCH7 » The North Carolina College of Agriculture and Mechanic Arts established; includes engineering departments 1889 » The first's first university-based nuclear reactor opens on NC State's campus 1978 » Alumnus Larry K. Monteith named

  7. Use of land surface remotely sensed satellite and airborne data for environmental exposure assessment in cancer research

    E-Print Network [OSTI]

    cancer and environmental contaminants, focusing primarily on agricultural chemical exposure assessmentUse of land surface remotely sensed satellite and airborne data for environmental exposure assessment in cancer research SUSAN K. MAXWELLa , JAYMIE R. MELIKERb AND PIERRE GOOVAERTSc a U.S. Geological

  8. Control of Major-Accident Hazards Involving Land Transmission Charlotte BOUISSOU, Project Manager for Pipelines Risk Assessment

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    aims to help authorities to balance the requirement of the new pipeline regulation with regardsControl of Major-Accident Hazards Involving Land Transmission Pipelines Charlotte BOUISSOU, Project Manager for Pipelines Risk Assessment Sandrine DESCOURRIERE, Project Manager for Plants Risk Assessment

  9. Coupling GIS and LCA for biodiversity assessments of land use: Part 1: Inventory modeling

    E-Print Network [OSTI]

    Geyer, Roland; Stoms, David M.; Lindner, Jan P.; Davis, Frank W.; Wittstock, Bastian

    2010-01-01T23:59:59.000Z

    of land use Part 1: Inventory modeling Roland Geyer & Davidthe use of GIS-based inventory modeling to generatedemonstrated that GIS-based inventory modeling of land use

  10. Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study, Report to Congress

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of Year 2010 SNFEnergy Policy ActEnergy | DepartmentVerDatePolicy Act

  11. Assessing the potential visibility benefits of Clean Air Act Title IV emission reductions

    SciTech Connect (OSTI)

    Trexler, E.C. Jr. [USDOE, Washington, DC (United States); Shannon, J.D. [Argonne National Lab., IL (United States)

    1995-06-01T23:59:59.000Z

    Assessments are made of the benefits of the 1990 Clean Air Act Title IV (COVE), Phase 2, SO2 and NOX reduction provisions, to the visibility in typical eastern and western Class 1 areas. Probable bands of visibility impairment distribution curves are developed for Shenandoah National Park, Smoky Mountain National Park and the Grand Canyon National Park, based on the existing emissions, ``Base Case``, and for the COVE emission reductions, ``CAAA Case``. Emission projections for 2010 are developed with improved versions of the National Acid Precipitation Assessment Program emission projection models. Source-receptor transfer matrices created with the Advanced Statistical Trajectory Regional Air Pollution (ASTRAP) model are used with existing emission inventories and with the emission projections to calculate atmospheric concentrations of sulfate and nitrate at the receptors of interest for existing and projected emission scenarios. The Visibility Assessment Scoping Model (VASM) is then used to develop distributions of visibility impairment. VASM combines statistics of observed concentrations of particulate species and relative humidity with ASTRAP calculations of the relative changes in atmospheric sulfate and nitrate particulate concentrations in a Monte Carlo approach to produce expected distributions of hourly particulate concentrations and RH. Light extinction relationships developed in theoretical and field studies are then used to calculate the resulting distribution of visibility impairment. Successive Monte Carlo studies are carried out to develop sets of visibility impairment distributions with and without the COVE emission reductions to gain insight into the detectability of expected visibility improvements.

  12. Wetlands Protection Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    This Act establishes regulations regarding the removal, dredging, filling, and altering of land bordering waters, allowing such activity only with permits and in certain situations. Specific...

  13. Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:CPublicDepartmentDRAFT

  14. A Global Land System Framework for Integrated Climate-Change Assessments

    E-Print Network [OSTI]

    Schlosser, C. Adam

    Land ecosystems play a major role in the global cycles of energy, water, carbon and nutrients. A Global Land System (GLS) framework has been developed for the Integrated Global Systems Model Version 2 (IGSM2) to simulate ...

  15. Risk assessment in decision making related to land-use planning (LUP) as required by the Seveso II directive

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Risk assessment in decision making related to land-use planning (LUP) as required by the Seveso II the requirement of the Seveso II directive and an analysis of the use of LUP as part of a risk management policy management policy combining several tools. To describe the risk management policy implemented in France

  16. Automate Monitoring System for the Dynamics of Lands Based on Aerial Photos Assessed by Artificial Neural Techniques

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    24 Automate Monitoring System for the Dynamics of Lands Based on Aerial Photos Assessed by Artificial Neural Techniques Ioan Ilean Department of Computer Science "1Decembrie 1918" University Alba. In this project an application of artificial neural networks to human-centered earth science information

  17. Land Use and Land Cover Change

    SciTech Connect (OSTI)

    Brown, Daniel; Polsky, Colin; Bolstad, Paul V.; Brody, Samuel D.; Hulse, David; Kroh, Roger; Loveland, Thomas; Thomson, Allison M.

    2014-05-01T23:59:59.000Z

    A contribution to the 3rd National Climate Assessment report, discussing the following key messages: 1. Choices about land-use and land-cover patterns have affected and will continue to affect how vulnerable or resilient human communities and ecosystems are to the effects of climate change. 2. Land-use and land-cover changes affect local, regional, and global climate processes. 3. Individuals, organizations, and governments have the capacity to make land-use decisions to adapt to the effects of climate change. 4. Choices about land use and land management provide a means of reducing atmospheric greenhouse gas levels.

  18. Risk assessment involving the land disposal of animal waste on Central Texas dairies

    E-Print Network [OSTI]

    Lee, Thomas Chadwick

    1999-01-01T23:59:59.000Z

    Land disposal of animal waste is an increasing problem for dairies in central Texas Once isolated, many producers now and themselves surrounded by towns and subdivisions. Many of these new neighbors are showing an increasing concern about potential...

  19. Assessing Perpetual Conservation Easements as a Tool for Land Protection: The Private Landowner Perspective

    E-Print Network [OSTI]

    Stroman, Dianne A

    2014-09-29T23:59:59.000Z

    Perpetual conservation easements have become one the primary tools used for long-term land protection and are credited with helping protect endangered species, preventing habitat fragmentation, maintaining ecosystem functions and conserving working...

  20. How many people can China feed? : assessing the impact of land and water constraints

    E-Print Network [OSTI]

    Watson, Amy Beth, 1980-

    2004-01-01T23:59:59.000Z

    Land and water resources are becoming increasingly scarce in China, threatening the nation's ability to feed its growing population. The limitations of these resources must be considered simultaneously to determine China's ...

  1. Coupling GIS and LCA for biodiversity assessments of land use: Part 1: Inventory modeling

    E-Print Network [OSTI]

    Geyer, Roland; Stoms, David M.; Lindner, Jan P.; Davis, Frank W.; Wittstock, Bastian

    2010-01-01T23:59:59.000Z

    explicit manner, while life cycle assessment (LCA) does notuse impacts in life cycle assessment. Int J LCA 11(5):363–Int J LCA Kim S, Dale BE (2005b) Life cycle assessment of

  2. Environmental Protection Act (Illinois)

    Broader source: Energy.gov [DOE]

    This Act states general provisions for the protection of the environment. It also states specific regulations for air, water and land pollution as well as atomic radiation, toxic chemical and oil...

  3. Forest Conservation Act (Maryland)

    Broader source: Energy.gov [DOE]

    The main purpose of Maryland's Forest Conservation Act is to minimize the loss of Maryland's forest resources during land development by making the identification and protection of forests and...

  4. Assessing the Feasibility of Renewable Energy Development and Energy Efficiency Deployment on Tribal Lands

    SciTech Connect (OSTI)

    Nominelli, Gregg R.

    2012-12-17T23:59:59.000Z

    The Keweenaw Bay Indian Community (KBIC) is committed to preserving our natural environment and reducing the amount of fossil fuels consumed while developing "green" business manufacturing jobs on tribal lands. The Tribe's Comprehensive Strategic Plan seeks to diversify the Tribal Economy through the creation of alternative energy businesses, such as wind, solar and bio-mass facilities while protecting the waters of Lake Superior, tribal inland lakes and streams. In addition, the Community desired to utilize clean/green energy resources to promote the self-sufficiency of the Tribal Nation. The objective of the study is to preserve our environment and maintain our cultural goals of using the resources of the land wisely. To reduce our consumption of fossil fuels, mercury and carbon dioxide emissions, which harm our water and land; we have decided to evaluate the opportunities of utilizing wind power. Preliminary projections show that we may eliminate pollution from our land in a cost effective manner. This study will evaluate wind capacity and our current energy consumption while projecting the feasibility of converting to wind power for operations at our major facilities. This project will study the feasibility of wind power at two locations for the purpose of reducing the Tribe's reliance upon fossil fuels and creating business opportunities, jobs and revenue for the community.

  5. DOE Report Assesses Potential for Carbon Dioxide Storage Beneath Federal Lands

    Broader source: Energy.gov [DOE]

    As a complementary document to the U.S. Department of Energy's Carbon Sequestration Atlas of the United States and Canada issued in November 2008, the Office of Fossil Energy's National Energy Technology Laboratory has now released a report that provides an initial estimate of the potential to store carbon dioxide underneath millions of acres of Federal lands.

  6. Integrating the principles of strategic environmental assessment into local comprehensive land use plans in California

    E-Print Network [OSTI]

    Tang, Zhenghong

    2009-05-15T23:59:59.000Z

    The lack of early integration with the planning and decision-making process has been a major problem in environmental assessment. Traditional project-based environmental impact assessment has inadequate incentives and capacities to incorporate...

  7. Integrating the principles of strategic environmental assessment into local comprehensive land use plans in California 

    E-Print Network [OSTI]

    Tang, Zhenghong

    2009-05-15T23:59:59.000Z

    The lack of early integration with the planning and decision-making process has been a major problem in environmental assessment. Traditional project-based environmental impact assessment has inadequate incentives and capacities to incorporate...

  8. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    SciTech Connect (OSTI)

    Gunning, Colleen, E-mail: Colleen_Gunning@health.qld.gov.a [Health Promotion Service (Mackay), Tropical Population Health Services (Australia); Harris, Patrick [CHETRE-UNSW Research Centre for Primary Health Care and Equity, University of New South Wales (Australia); Mallett, John [Regional Planner, Department of Communities (Australia)

    2011-07-15T23:59:59.000Z

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  9. Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

    SciTech Connect (OSTI)

    Annette L. Schafer; Lloyd C. Brown; David C. Carathers; Boyd D. Christensen; James J. Dahl; Mark L. Miller; Cathy Ottinger Farnum; Steven Peterson; A. Jeffrey Sondrup; Peter V. Subaiya; Daniel M. Wachs; Ruth F. Weiner

    2013-11-01T23:59:59.000Z

    Environmental and health impacts are presented for activities associated with transient testing of nuclear fuel and material using two candidate test reactors. Transient testing involves irradiation of nuclear fuel or materials for short time-periods under high neutron flux rates. The transient testing process includes transportation of nuclear fuel or materials inside a robust shipping cask to a hot cell, removal from the shipping cask, pre-irradiation examination of the nuclear materials, assembly of an experiment assembly, transportation of the experiment assembly to the test reactor, irradiation in the test reactor, transport back to the hot cell, and post-irradiation examination of the nuclear fuel or material. The potential for environmental or health consequences during the transportation, examination, and irradiation actions are assessed for normal operations, off-normal (accident) scenarios, and transportation. Impacts to the environment (air, soil, and groundwater), are assessed during each phase of the transient testing process. This report documents the evaluation of potential consequences to the general public. This document supports the Environmental Assessment (EA) required by the U.S. National Environmental Policy Act (NEPA) (42 USC Subsection 4321 et seq.).

  10. Evaluation of Methods to Assess and Reduce Bacterial Contamination of Surface Water from Grazing Lands

    E-Print Network [OSTI]

    Wagner, Kevin

    2012-10-19T23:59:59.000Z

    assessed the ability of alternative water supplies and grazing management to reduce E. coli loading from cattle and evaluated the ability of quantitative polymerase chain reaction analysis of total and bovine-associated Bacteroides markers (AllBac and Bo...

  11. Inequalities in Taxation of Farm Lands and City Property Due to Scope and Method of Assessment.

    E-Print Network [OSTI]

    Gabbard, L. P. (Letcher P.)

    1932-01-01T23:59:59.000Z

    to Scope and Method of Assessment AGRICULTURAL AND MECHANICAL COLLEGE OF TEXAS T. 0. WALTON, President STATION Administr2tion : A. B. Conner, M. S., Director R. E. Karper. M. S.. Vice-Director Clarice Mixson, B. A., Secretary M. P. Holleman, Jr... *Dean School of Veterinary Medicine. !As of September 1. ' 1932. **In cooperation with U. S. Department of Agriculture. a,.alysis of our assessment system reveals two outstanding weak- nesses; namely, the failure to tax intangible personal property...

  12. Ecological sustainability of energy cane as a biofuel feedstock Assess the ecological sustainability of deploying energy cane on land previously used for

    E-Print Network [OSTI]

    DeLucia, Evan H.

    Ecological sustainability of energy cane as a biofuel feedstock Objective Assess the ecological to the ecological sustainability of the wide-scale deployment of biofuel feedstocks. Key among these issues are how replacing current land use with biofuel feedstocks will affect the fluxes of greenhouse gases (CO2, CH4, N20

  13. An analysis of the impacts of use-value assessment on agricultural and open space land

    E-Print Network [OSTI]

    Gorman, Tia Dawn

    1991-01-01T23:59:59.000Z

    % 6. 82% 11. 42% Source: State Property Tax Board 1989 County Report of Property Value. Table 29. Agriculture's Share of the Tax Base Under Two Property Valuation Alternatives. Valuation Method Tax Base Agriculture's Contribution Agriculture... in assessed value, or benefit, is clustered in and around rapidly expanding metropolitan areas of the state, primarily the Houston and Dallas-Fort Worth areas. Additionally, a shift in the tax burden occurs as a result of ag-usc valuations from partiapating...

  14. Downscaling Global Land Cover Projections from an Integrated Assessment Model for Use in Regional Analyses: Results and Evaluation for the US from 2005 to 2095

    SciTech Connect (OSTI)

    West, Tristram O.; Le Page, Yannick LB; Huang, Maoyi; Wolf, Julie; Thomson, Allison M.

    2014-06-05T23:59:59.000Z

    Projections of land cover change generated from Integrated Assessment Models (IAM) and other economic-based models can be applied for analyses of environmental impacts at subregional and landscape scales. For those IAM and economic models that project land use at the sub-continental or regional scale, these projections must be downscaled and spatially distributed prior to use in climate or ecosystem models. Downscaling efforts to date have been conducted at the national extent with relatively high spatial resolution (30m) and at the global extent with relatively coarse spatial resolution (0.5 degree).

  15. An institutional assessment of the implementation and enforcement of the Clean Air Act: Puget Sound case study

    SciTech Connect (OSTI)

    Farrell, S.O.; Jensen, M.S.

    1980-11-26T23:59:59.000Z

    This report examines and evaluates the capabilities and effectiveness of the institutions charged with enforcing the Clean Air Act requirements in the Puget Sound region of the State of Washington. Among the sections of the Act addressed by the study are those concerning Federal grants, designation and planning, enforcement issues, and citizen suits. The requirements for nonattainment areas specified in Title I, Part D of the Act are reviewed extensively.

  16. Lakes and Rivers Improvement Act (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    The Lakes and Rivers Improvement Act proscribes the management, protection, preservation and use of the waters of the lakes and rivers of Ontario and the land under them. The Act also details...

  17. Assessment of Uncertainties in the Response of the African Monsoon Precipitation to Land Use change simulated by a regional model

    SciTech Connect (OSTI)

    Hagos, Samson M.; Leung, Lai-Yung R.; Xue, Yongkang; Boone, Aaron; de Sales, Fernando; Neupane, Naresh; Huang, Maoyi; Yoon, Jin-Ho

    2014-02-22T23:59:59.000Z

    Land use and land cover over Africa have changed substantially over the last sixty years and this change has been proposed to affect monsoon circulation and precipitation. This study examines the uncertainties on the effect of these changes on the African Monsoon system and Sahel precipitation using an ensemble of regional model simulations with different combinations of land surface and cumulus parameterization schemes. Although the magnitude of the response covers a broad range of values, most of the simulations show a decline in Sahel precipitation due to the expansion of pasture and croplands at the expense of trees and shrubs and an increase in surface air temperature.

  18. Final Report and Strategic Plan on the Feasibility Study to Assess Geothermal Potential on Warm Springs Reservation Lands. Report No. DOE/GO/15177

    SciTech Connect (OSTI)

    James Manion, Warm Springs Power & Water Enterprises; David McClain, McClain & Associates

    2007-05-17T23:59:59.000Z

    In 2005 the Confederated Tribes of Warm Springs Tribal Council authorized an evaluation of the geothermal development potential on the Confederated Tribes of Warm Springs Reservation of Oregon. Warm Springs Power & Water Enterprises obtained a grant from the U.S. Department of Energy to conduct a geological assessment and development estimate. Warm Springs Power & Water Enterprises utilized a team of expert consultants to conduct the study and develop a strategic plan. The resource assessment work was completed in 2006 by GeothermEx Inc., a consulting company specializing in geothermal resource assessments worldwide. The GeothermEx report indicates there is a 90% probability that a commercial geothermal resource exists on tribal lands in the Mt. Jefferson area. The geothermal resource assessment and other cost, risk and constraints information has been incorporated into the strategic plan.

  19. Feasibility Study of Economics and Performance of Solar Photovoltaics at the TechCity East Campus Resource Conservation and Recovery Act Site in Kingston, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J. W.; Mosey, G.; Healey, V.

    2014-01-01T23:59:59.000Z

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the TechCity East Campus site in Kingston, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  20. Health assessment for Royal Hardage Industrial Hazardous Waste Land Disposal Facility, Criner, Oklahoma, Region 6. CERCLIS No. OKD000400093. Final report

    SciTech Connect (OSTI)

    Not Available

    1988-12-01T23:59:59.000Z

    The Royal Hardage Industrial Hazardous Waste Land Disposal Facility (Hardage/Criner) National Priorities List Site is located in Criner, McClain County, Oklahoma. The site is located in an agricultural area. There are volatile organic compounds (VOCs) and several heavy metals present in the groundwater and soil, and VOCs in surface water and sediment. The Record of Decision signed November 1986 selected several remedial actions which included excavation of the primary source material and separation of the wastes for treatment, solids to be disposed of in an on-site landfill that meets Resource Conservation and Recovery Act requirements, organic liquids to be incinerated, and inorganic liquids to be treated by other means as necessary. The site is currently in the remedial-design phase.

  1. An assessment of the available windy land area and wind energy potential in the contiguous United States

    SciTech Connect (OSTI)

    Elliott, D.L.; Wendell, L.L.; Gower, G.L.

    1991-08-01T23:59:59.000Z

    Estimates of land areas with various levels of wind energy resource and resultant wind energy potential have been developed for each state in the contiguous United States. The estimates are based on published wind resource data and account for the exclusion of some windy lands as a result of environmental and land-use considerations. Despite these exclusions, the amount of wind resource estimated over the contiguous United States is surprisingly large and has the potential to supply a substantial fraction of the nation's energy needs, even with the use of today's wind turbine technology. Although this study shows that, after exclusions, only about 0.6% of the land area in the contiguous United States is characterized by high wind resource (comparable to that found in windy areas of California where wind energy is being cost-effectively developed), the wind electric potential that could be extracted with today's technology from these areas across the United States is equivalent to about 20% of the current US electric consumption. Future advances in wind turbine technology will further enhance the potential of wind energy. As advances in turbine technology allow areas of moderate wind resource to be developed, more than a tenfold increase in the wind energy potential is possible. These areas, which cover large sections of the Great Plains and are widely distributed throughout many other sections of the country, have the potential of producing more than three times the nation's current electric consumption. 9 refs., 12 figs., 13 tabs.

  2. act nepa characterization: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    was amended by the Waste Isolation Pilot Plant Land Withdrawal Act. Katherine Biggs, Associate Director, NEPA Compliance Division, Office of Federal Activities. FR Doc....

  3. Stormwater Management and Sediment Reduction Act (South Carolina)

    Broader source: Energy.gov [DOE]

    This Act sets general restrictions and permitting requirements on activities with the potential to disturb land and therefore contribute to erosion and sediment and alter stormwater runoff. Prior...

  4. Interaction effects of climate and land use/land cover change on soil organic carbon sequestration

    E-Print Network [OSTI]

    Grunwald, Sabine

    Interaction effects of climate and land use/land cover change on soil organic carbon sequestration carbon sequestration Climate change Soil carbon change Historically, Florida soils stored the largest in Florida (FL) have acted as a sink for carbon (C) over the last 40 years. · Climate interacting with land

  5. Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

    SciTech Connect (OSTI)

    Annette L. Schafer; LLoyd C. Brown; David C. Carathers; Boyd D. Christensen; James J. Dahl; Mark L. Miller; Cathy Ottinger Farnum; Steven Peterson; A. Jeffrey Sondrup; Peter V. Subaiya; Daniel M. Wachs; Ruth F. Weiner

    2014-02-01T23:59:59.000Z

    This document contains the analysis details and summary of analyses conducted to evaluate the environmental impacts for the Resumption of Transient Fuel and Materials Testing Program. It provides an assessment of the impacts for the two action alternatives being evaluated in the environmental assessment. These alternatives are (1) resumption of transient testing using the Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) and (2) conducting transient testing using the Annular Core Research Reactor (ACRR) at Sandia National Laboratory in New Mexico (SNL/NM). Analyses are provided for radiologic emissions, other air emissions, soil contamination, and groundwater contamination that could occur (1) during normal operations, (2) as a result of accidents in one of the facilities, and (3) during transport. It does not include an assessment of the biotic, cultural resources, waste generation, or other impacts that could result from the resumption of transient testing. Analyses were conducted by technical professionals at INL and SNL/NM as noted throughout this report. The analyses are based on bounding radionuclide inventories, with the same inventories used for test materials by both alternatives and different inventories for the TREAT Reactor and ACRR. An upper value on the number of tests was assumed, with a test frequency determined by the realistic turn-around times required between experiments. The estimates provided for impacts during normal operations are based on historical emission rates and projected usage rates; therefore, they are bounding. Estimated doses for members of the public, collocated workers, and facility workers that could be incurred as a result of an accident are very conservative. They do not credit safety systems or administrative procedures (such as evacuation plans or use of personal protective equipment) that could be used to limit worker doses. Doses estimated for transportation are conservative and are based on transport of the bounding radiologic inventory that will be contained in any given test. The transportation analysis assumes all transports will contain the bounding inventory.

  6. Mapping Savanna Land Change of Belize 

    E-Print Network [OSTI]

    Wilson, Lauren

    2011-11-24T23:59:59.000Z

    was assessed using a confusion matrix. The results of the research confirmed the capabilities of Landsat imagery for mapping savannas and their land use. The classification of forest and savanna along with major land use pressures from agriculture...

  7. Assessment of clear and cloudy sky parameterizations for daily downwelling longwave radiation over different land surfaces in

    E-Print Network [OSTI]

    meteorological data, resulting in reliable quantification of net radiation and evapotranspiration in FloridaAssessment of clear and cloudy sky parameterizations for daily downwelling longwave radiation over sky downwelling longwave radiation (Rldc) and cloudy sky downwelling longwave radiation (Rld) formulas

  8. Life Cycle Assessment of the Energy Independence and Security Act of 2007: Ethanol - Global Warming Potential and Environmental Emissions

    SciTech Connect (OSTI)

    Heath, G. A.; Hsu, D. D.; Inman, D.; Aden, A.; Mann, M. K.

    2009-07-01T23:59:59.000Z

    The objective of this study is to use life cycle assessment (LCA) to evaluate the global warming potential (GWP), water use, and net energy value (NEV) associated with the EISA-mandated 16 bgy cellulosic biofuels target, which is assumed in this study to be met by cellulosic-based ethanol, and the EISA-mandated 15 bgy conventional corn ethanol target. Specifically, this study compares, on a per-kilometer-driven basis, the GWP, water use, and NEV for the year 2022 for several biomass feedstocks.

  9. South Carolina Mining Act (South Carolina)

    Broader source: Energy.gov [DOE]

    The South Carolina Mining Act seeks to offer the greatest practical degree of protection and restoration to usefulness, productivity, and scenic values of all SC lands and waters involved in mining...

  10. Comprehensive Everglades Restoration Plan Regulation Act (Florida)

    Broader source: Energy.gov [DOE]

    This Act enacts the Comprehensive Everglades Restoration Plan, which is a joint state and federal effort to provide for the conservation of the Everglades region. The plan regulates land and water...

  11. Illinois Solid Waste Management Act (Illinois)

    Broader source: Energy.gov [DOE]

     It is the purpose of this Act to reduce reliance on land disposal of solid waste, to encourage and promote alternative means of managing solid waste, and to assist local governments with solid...

  12. Flathead Basin Commission Act of 1983 (Montana)

    Broader source: Energy.gov [DOE]

    This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

  13. Pennsylvania Solid Waste- Resource Recovery Development Act

    Broader source: Energy.gov [DOE]

    This act promotes the construction and the application of solid waste disposal/processing and resource recovery systems that preserve and enhance the quality of air, water, and land resources. The...

  14. Energy technology scenarios for use in water resources assessments under Section 13a of the Federal Nonnuclear Energy Research and Development Act

    SciTech Connect (OSTI)

    None

    1980-10-01T23:59:59.000Z

    This document presents two estimates of future growth of emerging energy technology in the years 1985, 1990, and 2000 to be used as a basis for conducting Water Resources Council assessments as required by the Nonnuclear Energy Research and Development Act of 1974. The two scenarios are called the high world oil price (HWOP) and low world oil price (LWOP) cases. A national-level summary of the ASA tabulations is shown in Appendix A; the scenarios are presented at the ASA level of detail in Appendix B. The two scenarios were generally derived from assumptions of the Second National Energy Plant (NEP II), including estimates of high and low world oil price cases, growth rate of GNP, and related economic parameters. The overall national energy growth inherent in these assumptions was expressed as a detailed projection of various energy fuel cycles through use of the Fossil-2 model and regionalized through use of the Strategic Environmental Assessment System (SEAS). These scenarios are for the use of regional analysts in examining the availability of water for and the potential impacts of future growth of emerging energy technology in selected river basins of the Nation, as required by Section 13(a).

  15. Recovery Act

    Broader source: Energy.gov [DOE]

    Recovery Act and Energy Department programs were designed to stimulate the economy while creating new power sources, conserving resources and aligning the nation to once again lead the global energy economy.

  16. Land and Renewable Resources | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a rich and thorough analysis to determine what areas of public lands are best suited for solar, wind, and geothermal project development and assess the associated environmental,...

  17. Assessment of microbial processes on radionuclide mobility in shallow land burial. [West Valley, NY; Beatty, Nevada; Maxey Flats, Kentucky

    SciTech Connect (OSTI)

    Colombo, P.; Tate, R.L. III; Weiss, A.J.

    1982-07-01T23:59:59.000Z

    The impact of microbial metabolism of the organic substituents of low level radioactive wastes on radionuclide mobility in disposal sites, the nature of the microbial transformations involved in this metabolism and the effect of the prevailing environmental parameters on the quantities and types of metabolic intermediates accumulated were examined. Since both aerobic and anaerobic periods can occur during trench ecosystem development, oxidation capacities of the microbial community in the presence and absence of oxygen were analyzed. Results of gas studies performed at three commercial low level radioactive waste disposal sites were reviewed. Several deficiencies in available data were determined. Further research needs are suggested. This assessment has demonstrated that the biochemical capabilities expressed within the low level radioactive waste disposal site are common to a wide variety of soil bacteria. Hence, assuming trenches would not be placed in sites with such extreme abiotic conditions that all microbial activity is precluded, the microbial populations needed for colonization and decomposition of the organic waste substances are readily provided from the waste itself and from the soil of existing and any proposed disposal sites. Indeed, considering the ubiquity of occurrence of the microorganisms responsible for waste decomposition and the chemical nature of the organic waste material, long-term prevention of biodecomposition is difficult, if not impossible.

  18. Waste Isolation Pilot Plant, Land Management Plan

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  19. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer, Arthur S. Rood, A. Jeffrey Sondrup

    2011-12-23T23:59:59.000Z

    Groundwater impacts have been analyzed for the proposed remote-handled low-level waste disposal facility. The analysis was prepared to support the National Environmental Policy Act environmental assessment for the top two ranked sites for the proposed disposal facility. A four-phase screening and analysis approach was documented and applied. Phase I screening was site independent and applied a radionuclide half-life cut-off of 1 year. Phase II screening applied the National Council on Radiation Protection analysis approach and was site independent. Phase III screening used a simplified transport model and site-specific geologic and hydrologic parameters. Phase III neglected the infiltration-reducing engineered cover, the sorption influence of the vault system, dispersion in the vadose zone, vertical dispersion in the aquifer, and the release of radionuclides from specific waste forms. These conservatisms were relaxed in the Phase IV analysis which used a different model with more realistic parameters and assumptions. Phase I screening eliminated 143 of the 246 radionuclides in the inventory from further consideration because each had a half-life less than 1 year. An additional 13 were removed because there was no ingestion dose coefficient available. Of the 90 radionuclides carried forward from Phase I, 57 radionuclides had simulated Phase II screening doses exceeding 0.4 mrem/year. Phase III and IV screening compared the maximum predicted radionuclide concentration in the aquifer to maximum contaminant levels. Of the 57 radionuclides carried forward from Phase II, six radionuclides were identified in Phase III as having simulated future aquifer concentrations exceeding maximum contaminant limits. An additional seven radionuclides had simulated Phase III groundwater concentrations exceeding 1/100th of their respective maximum contaminant levels and were also retained for Phase IV analysis. The Phase IV analysis predicted that none of the thirteen remaining radionuclides would exceed the maximum contaminant levels for either site location. The predicted cumulative effective dose equivalent from all 13 radionuclides also was less than the dose criteria set forth in Department of Energy Order 435.1 for each site location. An evaluation of composite impacts showed one site is preferable over the other based on the potential for commingling of groundwater contamination with other facilities.

  20. Statement of Work-National Environmental Policy Act (NEPA) Support...

    Office of Environmental Management (EM)

    Work-National Environmental Policy Act (NEPA) Support Services Acquisition: Preparation and Review of Environmental Impact Statements, Environmental Assessments, Environmental...

  1. The Dermatology Acting Internship

    E-Print Network [OSTI]

    Stephens, John B; Raimer, Sharon S; Jr, Richard F Wagner

    2011-01-01T23:59:59.000Z

    our experience with an acting internship in dermatology, weevolving role of the acting internship in the medical SchoolThe Dermatology Acting Internship John B Stephens MD, Sharon

  2. Radiation Protection Act (Pennsylvania)

    Broader source: Energy.gov [DOE]

    This Act combines the radiation safety provisions of The Atomic Energy Development and Radiation Control Act and the Environmental Radiation Protection Act, and empowers the Department of...

  3. pre-acts -6th annual international conference of Territorial Intelligence -caENTI October 2008 1 SUSTAINABLE DEVELOPMENT ASSESSMENT TOOLS DEDICATED TO TERRITORIAL

    E-Print Network [OSTI]

    Boyer, Edmond

    and Innovation Division is involved in various LCA projects such as the assessment of renewable energies (biogas

  4. Governing urban land : the political economy of the ULCRA in Mumbai

    E-Print Network [OSTI]

    Siddiqi, Faizan Jawed

    2013-01-01T23:59:59.000Z

    In this thesis, I look at the political economy of the Urban Land (Ceiling and Regulation) Act (ULCRA) in Mumbai, India. Enacted in 1976, the stated aim of this legislation was to prevent speculation in the urban land ...

  5. Climate and Energy-Water-Land System Interactions Technical Report to the U.S. Department of Energy in Support of the National Climate Assessment

    SciTech Connect (OSTI)

    Skaggs, Richard; Hibbard, Kathleen A.; Frumhoff, Peter; Lowry, Thomas; Middleton, Richard; Pate, Ron; Tidwell, Vincent C.; Arnold, J. G.; Averyt, Kristen; Janetos, Anthony C.; Izaurralde, Roberto C.; Rice, Jennie S.; Rose, Steven K.

    2012-03-01T23:59:59.000Z

    This report provides a framework to characterize and understand the important elements of climate and energy-water-land (EWL) system interactions. It identifies many of the important issues, discusses our understanding of those issues, and presents a long-term research program research needs to address the priority scientific challenges and gaps in our understanding. Much of the discussion is organized around two discrete case studies with the broad themes of (1) extreme events and (2) regional intercomparisons. These case studies help demonstrate unique ways in which energy-water-land interactions can occur and be influenced by climate.

  6. Freedom of Information Act (FOIA) and Privacy Act Requests |...

    Energy Savers [EERE]

    Freedom of Information Act (FOIA) and Privacy Act Requests Freedom of Information Act (FOIA) and Privacy Act Requests FOIA and Privacy Act Requests FOIA Requests FOIA information...

  7. Recovery Act: State Assistance for Recovery Act Related Electricity...

    Energy Savers [EERE]

    Information Center Recovery Act Recovery Act: State Assistance for Recovery Act Related Electricity Policies Recovery Act: State Assistance for Recovery Act Related...

  8. Naval Station Newport Wind Resource Assessment. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites, and The Naval Facilities Engineering Service Center

    SciTech Connect (OSTI)

    Robichaud, R.; Fields, J.; Roberts, J. O.

    2012-02-01T23:59:59.000Z

    The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy (RE) on potentially contaminated land and mine sites. EPA is collaborating with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate RE options at Naval Station (NAVSTA) Newport in Newport, Rhode Island where multiple contaminated areas pose a threat to human health and the environment. Designated a superfund site on the National Priorities List in 1989, the base is committed to working toward reducing the its dependency on fossil fuels, decreasing its carbon footprint, and implementing RE projects where feasible. The Naval Facilities Engineering Service Center (NFESC) partnered with NREL in February 2009 to investigate the potential for wind energy generation at a number of Naval and Marine bases on the East Coast. NAVSTA Newport was one of several bases chosen for a detailed, site-specific wind resource investigation. NAVSTA Newport, in conjunction with NREL and NFESC, has been actively engaged in assessing the wind resource through several ongoing efforts. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and a survey of potential wind turbine options based upon the site-specific wind resource.

  9. Environmental Assessment of Rail Infrastructure in Illinois

    E-Print Network [OSTI]

    Illinois at Urbana-Champaign, University of

    and agricultural lands Farmland Protection Policy Act; Illinois Farmland Preservation Act; Illinois Natural Areas Acres in high flood hazard area Flood Disaster Protection Act Acres in high seismic hazard area 49 CFR Species Act; Illinois Endangered Species Act Protect high-quality natural & agricultural landscapes Acres

  10. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    SciTech Connect (OSTI)

    Russo, Bryan J.; Chvala, William D.

    2010-09-30T23:59:59.000Z

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  11. WATER RESOURCES PLANNING ACT Q:\\COMP\\WATER1\\WRPA

    E-Print Network [OSTI]

    US Army Corps of Engineers

    103 WATER RESOURCES PLANNING ACT Q:\\COMP\\WATER1\\WRPA December 29, 2000 #12;Q:\\COMP\\WATER1\\WRPA December 29, 2000 #12;105 WATER RESOURCES PLANNING ACT [As Amended Through P.L. 106­580, Dec. 29, 2000 planning of water and related land resources, through the establishment of a water resources council

  12. Act 38 Record Keeping Checklist Pennsylvania's Nutrient Management Plans

    E-Print Network [OSTI]

    Guiltinan, Mark

    March 2007 Act 38 Record Keeping Checklist Pennsylvania's Nutrient Management Plans The following group listed in the nutrient management plan. To fulfill Act 38 record keeping requirements a file in the nutrient management plan. In addition, the following land application information must be recorded annually

  13. Primitive Land Plants 37 PRIMITIVE LAND PLANTS

    E-Print Network [OSTI]

    Koptur, Suzanne

    Primitive Land Plants 37 PRIMITIVE LAND PLANTS These are the plants that were present soon after land was colonized, over 400 mil- lion years ago. A few plants living today are closely related to those ancient plants, and we often call them "living fossils". Two major lineages of plants evolved

  14. Water Management Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    This Act regulates and registers water withdrawals in the Commonwealth of Massachusetts to enable effective planning and management of water use and conservation. The Act establishes a Water...

  15. RESOURCE INVENTORY AND MONITORING CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS

    E-Print Network [OSTI]

    RESOURCE INVENTORY AND MONITORING CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML assessments · Rangeland health assessments #12;RESOURCE INVENTORY AND MONITORING CENTER FOR ENVIRONMENTAL

  16. Remedial Action Assessment System (RAAS): Evaluation of selected feasibility studies of CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) hazardous waste sites

    SciTech Connect (OSTI)

    Whelan, G. (Pacific Northwest Lab., Richland, WA (USA)); Hartz, K.E.; Hilliard, N.D. (Beck (R.W.) and Associates, Seattle, WA (USA))

    1990-04-01T23:59:59.000Z

    Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluated and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.

  17. Environmental Assessment and Corrective Measures Study Report for Remediating Contamination at Lawrence Berkeley National Laboratory Regulated under the Resource Conservation and Recovery Act

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of Year 2010 SNFEnergySession0-02 -RailroadEnvironmentalAssessment

  18. A multi-scale metrics approach to forest fragmentation for Strategic Environmental Impact Assessment

    SciTech Connect (OSTI)

    Kim, Eunyoung, E-mail: eykim@kei.re.kr [Korea Environment Institute, 215 Jinheungno, Eunpyeong-gu, Seoul 122-706 (Korea, Republic of)] [Korea Environment Institute, 215 Jinheungno, Eunpyeong-gu, Seoul 122-706 (Korea, Republic of); Song, Wonkyong, E-mail: wksong79@gmail.com [Suwon Research Institute, 145 Gwanggyo-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do 443-270 (Korea, Republic of)] [Suwon Research Institute, 145 Gwanggyo-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do 443-270 (Korea, Republic of); Lee, Dongkun, E-mail: dklee7@snu.ac.kr [Department of Landscape Architecture and Rural System Engineering, Seoul National University, 599 Gwanakro, Gwanak-gu, Seoul 151-921 (Korea, Republic of) [Department of Landscape Architecture and Rural System Engineering, Seoul National University, 599 Gwanakro, Gwanak-gu, Seoul 151-921 (Korea, Republic of); Research Institute for Agriculture and Life Sciences, Seoul National University, Seoul 151-921 (Korea, Republic of)

    2013-09-15T23:59:59.000Z

    Forests are becoming severely fragmented as a result of land development. South Korea has responded to changing community concerns about environmental issues. The nation has developed and is extending a broad range of tools for use in environmental management. Although legally mandated environmental compliance requirements in South Korea have been implemented to predict and evaluate the impacts of land-development projects, these legal instruments are often insufficient to assess the subsequent impact of development on the surrounding forests. It is especially difficult to examine impacts on multiple (e.g., regional and local) scales in detail. Forest configuration and size, including forest fragmentation by land development, are considered on a regional scale. Moreover, forest structure and composition, including biodiversity, are considered on a local scale in the Environmental Impact Assessment process. Recently, the government amended the Environmental Impact Assessment Act, including the SEA, EIA, and small-scale EIA, to require an integrated approach. Therefore, the purpose of this study was to establish an impact assessment system that minimizes the impacts of land development using an approach that is integrated across multiple scales. This study focused on forest fragmentation due to residential development and road construction sites in selected Congestion Restraint Zones (CRZs) in the Greater Seoul Area of South Korea. Based on a review of multiple-scale impacts, this paper integrates models that assess the impacts of land development on forest ecosystems. The applicability of the integrated model for assessing impacts on forest ecosystems through the SEIA process is considered. On a regional scale, it is possible to evaluate the location and size of a land-development project by considering aspects of forest fragmentation, such as the stability of the forest structure and the degree of fragmentation. On a local scale, land-development projects should consider the distances at which impacts occur in the vicinity of the forest ecosystem, and these considerations should include the impacts on forest vegetation and bird species. Impacts can be mitigated by considering the distances at which these influences occur. In particular, this paper presents an integrated environmental impact assessment system to be applied in the SEIA process. The integrated assessment system permits the assessment of the cumulative impacts of land development on multiple scales. -- Highlights: • The model is to assess the impact of forest fragmentation across multiple scales. • The paper suggests the type of forest fragmentation on a regional scale. • The type can be used to evaluate the location and size of a land development. • The paper shows the influence distance of land development on a local scale. • The distance can be used to mitigate the impact at an EIA process.

  19. FSH 1909.15 - National Environmental Policy Act Handbook: Chapter...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - GuideHandbook: FSH 1909.15 - National Environmental Policy Act Handbook: Chapter 40, Environmental Assessments and Related...

  20. Privacy Act of 1974; Publication of Compilation of Privacy Act...

    Office of Environmental Management (EM)

    Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of...

  1. Safety assessment of alternatives to shallow-land burial of low-level radioactive waste: Volume 2, Environmental conditions affecting reliability of engineered barriers. [Contains glossary

    SciTech Connect (OSTI)

    Cerven, F.; Otis, M.D.

    1987-09-01T23:59:59.000Z

    The need for new disposal capacity for low-level radioactive waste (LLW) has led to a re-examination of disposal practices. A number of enhancements and alternatives to traditional shallow-land burial have been proposed to meet the need for new capacity and to address various concerns about the performance history of existing commercial LLW sites. Fifteen potentially important degradation mechanisms for a LLW facility are identified, categorized, and analyzed to determine their importance to the proper functioning of the disposal facility over its 500-year lifetime. Wind storms, biological intrusion, mechanical settling, freeze/thaw cycling, chemical degradation, wind erosion, and water erosion were considered the most important mechanisms. Data supporting concrete structure long-term performance in sulfate environments and long-term cover performance in erosive and biological intrusion environments were obtained. Research on the performance of covers and concrete structures in the presence of the other listed degradation mechanisms is recommended. 18 refs., 16 figs., 9 tabs.

  2. Alabama Land Recycling And Economic Redevelopment Act (Alabama)

    Broader source: Energy.gov [DOE]

    This article establishes a program, to be implemented, maintained, and administered by the Alabama Department of Environmental Management, to encourage the voluntary cleanup and the reuse and...

  3. Montana Natural Streambed and Land Preservation Act Webpage | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir| OpenUse Jump

  4. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-08-01T23:59:59.000Z

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  5. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-12-01T23:59:59.000Z

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  6. School Land Board (Texas)

    Broader source: Energy.gov [DOE]

    The School Land Board oversees the use of land owned by the state or held in trust for use and benefit by the state or one of its departments, boards, or agencies. The Board is responsible for...

  7. Chesapeake Forest Lands (Maryland)

    Broader source: Energy.gov [DOE]

    The Chesapeake Forest Lands are most of the former land holdings of the Chesapeake Forest Products Company, which now includes more than 66,000 acres in five lower Eastern Shore counties. These...

  8. Recovery Act Milestones

    ScienceCinema (OSTI)

    Rogers, Matt

    2013-05-29T23:59:59.000Z

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

  9. Intergovernmental Personnel Act Assignments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-08-24T23:59:59.000Z

    This Manual implements provisions of the Intergovernmental Personnel Act (IPA) within the Department of Energy (DOE) and establishes requirements, responsibilities, and authority for effecting assignments under the Act. Does not cancel other directives.

  10. Water Quality Act (Montana)

    Broader source: Energy.gov [DOE]

    The Water Quality Act establishes water conservation and protection, as well as the prevention, abatement, and control of water pollution, as the policy of the state of Montana. The Act establishes...

  11. Coastal Management Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Coastal Management Act provides enabling authority for the State to prepare and administer a coastal management program. The Act does not establish new regulations or laws; it is designed to...

  12. Survey of Critical Wetlands Bureau of Land Management Lands

    E-Print Network [OSTI]

    Survey of Critical Wetlands Bureau of Land Management Lands South Park, Park County, Colorado 2003 Delivery Colorado State University #12;Survey of Critical Wetlands Bureau of Land Management Lands South

  13. ACT-ARA

    Energy Science and Technology Software Center (OSTI)

    003092IBMPC00 ACT-ARA: Code System for the Calculation of Changes in Radiological Source Terms with Time   

  14. NREL: International Activities - Biomass Resource Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Biomass Resource Assessment Map showing annual productivity of marginal lands in APEC economies. Biomass resource assessments quantify the existing or potential biomass material in...

  15. DOEEA-1203 Environmental Assessment

    Broader source: Energy.gov (indexed) [DOE]

    eve1 m i xed waste low-level waste National Environmental Policy Act o f 1969 performance assessment Resource Conservation and Recovery Act o f 1976 roentgen equi valent man...

  16. LAND AND WATER USE CHARACTERISTICS AND HUMAN HEALTH INPUT PARAMETERS FOR USE IN ENVIRONMENTAL DOSIMETRY AND RISK ASSESSMENTS AT THE SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Jannik, T.; Karapatakis, D.; Lee, P.; Farfan, E.

    2010-08-06T23:59:59.000Z

    Operations at the Savannah River Site (SRS) result in releases of small amounts of radioactive materials to the atmosphere and to the Savannah River. For regulatory compliance purposes, potential offsite radiological doses are estimated annually using computer models that follow U.S. Nuclear Regulatory Commission (NRC) Regulatory Guides. Within the regulatory guides, default values are provided for many of the dose model parameters but the use of site-specific values by the applicant is encouraged. A detailed survey of land and water use parameters was conducted in 1991 and is being updated here. These parameters include local characteristics of meat, milk and vegetable production; river recreational activities; and meat, milk and vegetable consumption rates as well as other human usage parameters required in the SRS dosimetry models. In addition, the preferred elemental bioaccumulation factors and transfer factors to be used in human health exposure calculations at SRS are documented. Based on comparisons to the 2009 SRS environmental compliance doses, the following effects are expected in future SRS compliance dose calculations: (1) Aquatic all-pathway maximally exposed individual doses may go up about 10 percent due to changes in the aquatic bioaccumulation factors; (2) Aquatic all-pathway collective doses may go up about 5 percent due to changes in the aquatic bioaccumulation factors that offset the reduction in average individual water consumption rates; (3) Irrigation pathway doses to the maximally exposed individual may go up about 40 percent due to increases in the element-specific transfer factors; (4) Irrigation pathway collective doses may go down about 50 percent due to changes in food productivity and production within the 50-mile radius of SRS; (5) Air pathway doses to the maximally exposed individual may go down about 10 percent due to the changes in food productivity in the SRS area and to the changes in element-specific transfer factors; and (6) Air pathway collective doses may go down about 30 percent mainly due to the decrease in the inhalation rate assumed for the average individual.

  17. Development of a total landed cost and risk analysis model for global strategic sourcing

    E-Print Network [OSTI]

    Feller, Brian (Brian C.)

    2008-01-01T23:59:59.000Z

    Total landed cost and supply chain risk analysis are methods that many companies use to assess strategic sourcing decisions. For this project, landed cost is defined as those costs associated with material movement from a ...

  18. Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  19. Shore Protection Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Shore Protection Act is the primary legal authority for protection and management of Georgia's shoreline features including sand dunes, beaches, sandbars, and shoals, collectively known as the...

  20. Energy Monitoring Act (Canada)

    Broader source: Energy.gov [DOE]

    This act requires that every energy enterprise file with the Minister a return setting out statistics and information relating to its ownership and control; financial information; information,...

  1. Wetland Conservation Act (Minnesota)

    Broader source: Energy.gov [DOE]

    This chapter of the Minnesota Administrative Rules implements the Wetland Conservation Act of 1991, setting standards for water preservation, withdrawal, and replacement.

  2. Recovery Act State Summaries | Department of Energy

    Energy Savers [EERE]

    Act State Memo Virgin Islands Recovery Act State Memo Washington Recovery Act State Memo West Virginia Recovery Act State Memo Wisconsin Recovery Act State Memo Wyoming Recovery...

  3. Finding of no significant impact: Changes in the sanitary sludge land application program on the Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-10-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1042) that evaluates potential impacts of proposed changes in the sanitary sludge land application program on the DOE Oak Ridge Reservation (ORR), Oak Ridge, Tennessee. Changes in lifetime sludge land application limits and radionuclide loading are proposed, and two new sources of sewage sludge from DOE facilities would be transported to the City of Oak Ridge Publicly Owned Treatment Works (COR POTW). Lifetime sludge land application limits would increase from 22 tons/acre to 50 tons/acre, which is the limit approved and permitted by the Tennessee Department of Environment and Conservation (TDEC). With the approval of TDEC, the permissible radiological dose from sludge land application would change from the current limit of 2x background radionuclide concentrations in receiving soils to a risk-based dose limit of 4 millirem (mrem) per year for the maximally exposed individual. Sludge land application sites would not change from those that are currently part of the program. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this Finding of No Significant Impact (FONSI). 70 refs., 2 figs., 17 tabs.

  4. Title 43 CFR 2800 Rights-of-way Under the Federal Land Policy...

    Open Energy Info (EERE)

    Land Policy Management Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 2800 Rights-of-way...

  5. Issues Associated with the Conveyance and Transfer of DOE Lands under Public Law 105-119

    SciTech Connect (OSTI)

    Ladino, A.G.

    1999-04-21T23:59:59.000Z

    Public Law 105-119 (Law) was enacted in November 1997 as part of the Defense Authorization Act of 1998 (Act). The Law specifically requires the US Department of Energy (DOE) to identify lands that are suitable for conveyance or transfer at Los Alamos National Laboratory (LANL) within 90 days after enactment of the Act. In general, suitable lands include those parcels that are not required to meet the national security missions assigned to DOE at LANL within a ten year period beginning on the date of enactment of the Act. Additional suitability criteria are addressed below and include the need to establish clear title to the land and to restore areas contaminated with hazardous wastes. This proposed change in future land ownership is intended to serve as the final settlement of DOE community assistance obligations with respect to LANL and Los Alamos County and to stimulate economic development.

  6. Wind Development on Tribal Lands

    SciTech Connect (OSTI)

    Ken Haukaas; Dale Osborn; Belvin Pete

    2008-01-18T23:59:59.000Z

    Background: The Rosebud Sioux Tribe (RST) is located in south central South Dakota near the Nebraska border. The nearest community of size is Valentine, Nebraska. The RST is a recipient of several Department of Energy grants, written by Distributed Generation Systems, Inc. (Disgen), for the purposes of assessing the feasibility of its wind resource and subsequently to fund the development of the project. Disgen, as the contracting entity to the RST for this project, has completed all the pre-construction activities, with the exception of the power purchase agreement and interconnection agreement, to commence financing and construction of the project. The focus of this financing is to maximize the economic benefits to the RST while achieving commercially reasonable rates of return and fees for the other parties involved. Each of the development activities required and its status is discussed below. Land Resource: The Owl Feather War Bonnet 30 MW Wind Project is located on RST Tribal Trust Land of approximately 680 acres adjacent to the community of St. Francis, South Dakota. The RST Tribal Council has voted on several occasions for the development of this land for wind energy purposes, as has the District of St. Francis. Actual footprint of wind farm will be approx. 50 acres. Wind Resource Assessment: The wind data has been collected from the site since May 1, 2001 and continues to be collected and analyzed. The latest projections indicate a net capacity factor of 42% at a hub height of 80 meters. The data has been collected utilizing an NRG 9300 Data logger System with instrumentation installed at 30, 40 and 65 meters on an existing KINI radio tower. The long-term annual average wind speed at 65-meters above ground level is 18.2 mph (8.1 mps) and 18.7 mph (8.4 mps) at 80-meters agl. The wind resource is excellent and supports project financing.

  7. Wind Energy Act (Maine)

    Broader source: Energy.gov [DOE]

    The Maine Wind Energy Act is a summary of legislative findings that indicate the state's strong interest in promoting the development of wind energy and establish the state's desire to ease the...

  8. Public Utilities Act (Illinois)

    Broader source: Energy.gov [DOE]

    This act aims to make energy services in the state reliable and efficient, while preserving the quality if the environment. It states the duties of public utilities in terms of accounts and reports...

  9. High Voltage Safety Act

    Broader source: Energy.gov [DOE]

    The purpose of the High Voltage Safety Act is to prevent injury to persons and property and interruptions of utility service resulting from accidental or inadvertent contact with high-voltage...

  10. Mississippi Public Utility Act

    Broader source: Energy.gov [DOE]

    The Mississippi Public Utility Act is relevant to any project that plans to generate energy. It requires that a utility must first obtain a Certificate of Public Convenience and Necessity (CPCN)...

  11. Radiation Management Act (Oklahoma)

    Broader source: Energy.gov [DOE]

    This Act establishes The Department of Environmental Quality as the designated official agency of the State of Oklahoma for all regulatory activities for the use of atomic energy and sources of...

  12. Healthy Air Act (Maryland)

    Broader source: Energy.gov [DOE]

    The Maryland Healthy Air Act was developed with the purpose of bringing Maryland into attainment with the National Ambient Air Quality Standards (NAAQS) for ozone and fine particulate matter by the...

  13. Freedom of Information Act/Privacy Act Requests | National Nuclear...

    National Nuclear Security Administration (NNSA)

    ActPrivacy Act Requests | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the...

  14. Recovery Act Funds at Work

    Broader source: Energy.gov [DOE]

    Funds from the American Recovery and Reinvestment Act of 2009 (Recovery Act) are being put to work to improve safety, reliability, and service in systems across the country. Here are case studies from a variety of Recovery Act programs.

  15. 1998 report on Hanford Site land disposal restrictions for mixed waste

    SciTech Connect (OSTI)

    Black, D.G.

    1998-04-10T23:59:59.000Z

    This report was submitted to meet the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-26-01H. This milestone requires the preparation of an annual report that covers characterization, treatment, storage, minimization, and other aspects of managing land-disposal-restricted mixed waste at the Hanford Facility. The US Department of Energy, its predecessors, and contractors on the Hanford Facility were involved in the production and purification of nuclear defense materials from the early 1940s to the late 1980s. These production activities have generated large quantities of liquid and solid mixed waste. This waste is regulated under authority of both the Resource Conservation and Recovery Act of l976 and the Atomic Energy Act of 1954. This report covers only mixed waste. The Washington State Department of Ecology, US Environmental Protection Agency, and US Department of Energy have entered into the Tri-Party Agreement to bring the Hanford Facility operations into compliance with dangerous waste regulations. The Tri-Party Agreement required development of the original land disposal restrictions (LDR) plan and its annual updates to comply with LDR requirements for mixed waste. This report is the eighth update of the plan first issued in 1990. The Tri-Party Agreement requires and the baseline plan and annual update reports provide the following information: (1) Waste Characterization Information -- Provides information about characterizing each LDR mixed waste stream. The sampling and analysis methods and protocols, past characterization results, and, where available, a schedule for providing the characterization information are discussed. (2) Storage Data -- Identifies and describes the mixed waste on the Hanford Facility. Storage data include the Resource Conservation and Recovery Act of 1976 dangerous waste codes, generator process knowledge needed to identify the waste and to make LDR determinations, quantities stored, generation rates, location and method of storage, an assessment of storage-unit compliance status, storage capacity, and the bases and assumptions used in making the estimates.

  16. Massachusetts Clean Air Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    The Act contains regulations to prevent the pollution and contamination of the atmosphere. The Act establishes a contiguous metropolitan pollution control district, comprised of towns in the...

  17. Coastal Marshlands Protection Act (Georgia

    Broader source: Energy.gov [DOE]

    The Coastal Marshlands Protection Act provides the Coastal Resources Division with the authority to protect tidal wetlands. The Coastal Marshlands Protection Act limits certain activities and...

  18. Environmental Protection Act (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    The Environmental Protection Act is Ontario's key legislation for environmental protection. The act grants the Ministry of the Environment broad powers to deal with the discharge of contaminants...

  19. Recovery Act State Memos Kentucky

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * KENTUCKY RECOVERY ACT SNAPSHOT Kentucky has substantial natural resources, including coal, oil, gas, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA)...

  20. The influence of public opinion on the drafting of the Taylor Grazing Act of 1934

    E-Print Network [OSTI]

    Stout, Joseph Allen

    1968-01-01T23:59:59.000Z

    the public lands might be used by private individuals, title to tho e lands should be retained in the name of the people as a whale, The prelude to this change was a lengthy debate, in and out of Congress, concerning the desiraoility of continued... entralized federal control, the requirements of conservation, and the right of private users of land, The beginning of the debate in the 1920's over public lands, which culminated in the Taylor Act, had its genesis in the startling proposal by the Hoover...

  1. ARM - Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMForms About Become a UsergovAboutRecovery Act Recovery Act Logo

  2. Small Business Administration Recovery Act Implementation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Small Business Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation Small...

  3. Recovery Act State Memos Montana

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 5 RECOVERY ACT SUCCESS STORIES - ENERGY EMPOWERS * Green power transmission line given new life ......

  4. Land-use Leakage

    SciTech Connect (OSTI)

    Calvin, Katherine V.; Edmonds, James A.; Clarke, Leon E.; Bond-Lamberty, Benjamin; Kim, Son H.; Wise, Marshall A.; Thomson, Allison M.; Kyle, G. Page

    2009-12-01T23:59:59.000Z

    Leakage occurs whenever actions to mitigate greenhouse gas emissions in one part of the world unleash countervailing forces elsewhere in the world so that reductions in global emissions are less than emissions mitigation in the mitigating region. While many researchers have examined the concept of industrial leakage, land-use policies can also result in leakage. We show that land-use leakage is potentially as large as or larger than industrial leakage. We identify two potential land-use leakage drivers, land-use policies and bioenergy. We distinguish between these two pathways and run numerical experiments for each. We also show that the land-use policy environment exerts a powerful influence on leakage and that under some policy designs leakage can be negative. International “offsets” are a potential mechanism to communicate emissions mitigation beyond the borders of emissions mitigating regions, but in a stabilization regime designed to limit radiative forcing to 3.7 2/m2, this also implies greater emissions mitigation commitments on the part of mitigating regions.

  5. Energy and land use

    SciTech Connect (OSTI)

    Not Available

    1981-12-01T23:59:59.000Z

    This report addresses the land use impacts of past and future energy development and summarizes the major federal and state legislation which influences the potential land use impacts of energy facilities and can thus influence the locations and timing of energy development. In addition, this report describes and presents the data which are used to measure, and in some cases, predict the potential conflicts between energy development and alternative uses of the nation's land resources. The topics section of this report is divided into three parts. The first part describes the myriad of federal, state and local legislation which have a direct or indirect impact upon the use of land for energy development. The second part addresses the potential land use impacts associated with the extraction, conversion and combustion of energy resources, as well as the disposal of wastes generated by these processes. The third part discusses the conflicts that might arise between agriculture and energy development as projected under a number of DOE mid-term (1990) energy supply and demand scenarios.

  6. Division of Water, Part 666: Regulation for Administration and Management of the Wild, Scenic and Recreational Rivers System in New York State Excepting Private Land in the Adirondack Park (New York)

    Broader source: Energy.gov [DOE]

    This Act establishes statewide regulations for the management, protection, enhancement and control of land use and development in river areas on all designated wild, scenic and recreational rivers...

  7. Lands & Community

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your Home asLCLSLaboratoryRowland to receiveLand ManagementLands

  8. Recovery Act Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection RadiationRecord-Setting Microscopy IlluminatesHandbookRODs Sign Act

  9. Title: Canada Land Inventory: Land Capability for Recreation Data Creator /

    E-Print Network [OSTI]

    Title: Canada Land Inventory: Land Capability for Recreation Data Creator / Copyright Owner: National Archives of Canada, Visual and Sound Archives Division Publisher: National Archives of Canada, Visual and Sound Archives Division; developed under the auspices of Environment Canada; distributed

  10. Title: Canada Land Inventory: Land Capability for Ungulates Data Creator /

    E-Print Network [OSTI]

    Title: Canada Land Inventory: Land Capability for Ungulates Data Creator / Copyright Owner: National Archives of Canada, visual and Sound Archives Division Publisher: National Archives of Canada, Visual and Sound Archives Division; developed under the auspices of Environment Canada; distributed

  11. Title: Canada Land Inventory: Land Capability for Agriculture Data Creator /

    E-Print Network [OSTI]

    Title: Canada Land Inventory: Land Capability for Agriculture Data Creator / Copyright Owner: National Archives of Canada, Visual and Sound Archives Division Publisher: National Archives of Canada, Visual and Sound Archives Division; developed under the auspices of Environment Canada; distributed

  12. Recovery Act Expanding the First Significant U.S. ? Based Manufacturi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications Recovery Act Expanding the First Significant U.S. Based Manufacturing Expanding U.S.-based Lithium-ion Battery Manufacturing EA-1710: Final Environmental Assessment...

  13. Recovery Act Expanding the First Significant U.S. ? Based Manufacturi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications Recovery Act Expanding the First Significant U.S. Based Manufacturing EA-1710: Final Environmental Assessment Expanding U.S.-based Lithium-ion Battery Manufacturing...

  14. National Forest Land Scheme

    E-Print Network [OSTI]

    and Community Right to Buy. Communities are encouraged to register an interest in the land they wish to buy Ministers to make a late registration of interest. When Forestry Commission Scotland decides to sell, a community organisation could consider the opportunities for working in partnership with Forestry Commission

  15. County Land Preservation and Use Commissions (Iowa)

    Broader source: Energy.gov [DOE]

    This ordinance creates Land Preservation and Use Commissions in each county to provide for the orderly use and development of land, to protect agricultural land from nonagricultural development,...

  16. NIST Organic Act National Institute of Standards and Technology Act

    E-Print Network [OSTI]

    Magee, Joseph W.

    NIST Organic Act National Institute of Standards and Technology Act SECTION 1. FINDINGS in manufacturing technology, quality control, and techniques for ensuring product reliability and cost concerns compete strongly in world markets. (3) Improvements in manufacturing and product technology depend

  17. Virginia Resources Authority Act (Virginia)

    Broader source: Energy.gov [DOE]

    The Virginia Resources Authority provides financing options to support community investment in a number of areas, including wastewater, flood prevention and dam safety, solid waste, water, land...

  18. Pollution Control Act (South Carolina)

    Broader source: Energy.gov [DOE]

    This Act declares the maintenance of reasonable standards of purity of air and water to be the public policy of the state. The Act authorizes the Department of Health and Environmental Control to...

  19. Solid Waste Act (New Mexico)

    Broader source: Energy.gov [DOE]

    The main purpose of the Solid Waste Act is to authorize and direct the establishment of a comprehensive solid waste management program. The act states details about specific waste management...

  20. Montana Radon Control Act (Montana)

    Broader source: Energy.gov [DOE]

    The Radon Control Act regulates the emission of radon, the gaseous decay products of uranium or thorium. The Act addresses operator certification of radon-producing facilities, testing and...

  1. ARM - Recovery Act Instruments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadap Documentation TDMADAP :ProductsVaisala CL51Instruments Related Links RHUBC-IIActRecovery Act

  2. Recovery Act State Memos Nebraska

    Energy Savers [EERE]

    ... 6 RECOVERY ACT SUCCESS STORIES - ENERGY EMPOWERS * Biofuels company builds new facility in Nebraska ... 7 * Nebraska appliance rebate...

  3. Recovery Act State Memos Arkansas

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 RECOVERY ACT SUCCESS STORIES - ENERGY EMPOWERS * Program finds unique way to fund energy upgrades ... 7 * Green collar courses ......

  4. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01T23:59:59.000Z

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  5. Aggressive landing maneuvers for unmanned aerial vehicles

    E-Print Network [OSTI]

    Bayraktar, Selcuk

    2006-01-01T23:59:59.000Z

    VTOL (Vertical Take Off and Landing) vehicle landing is considered to be a critically difficult task for both land, marine, and urban operations. This thesis describes one possible control approach to enable landing of ...

  6. Harmonization of Land-Use Scenarios for the Period 1500-2100: 600 Years of Global Gridded Annual Land-Use Transitions, Wood Harvest, and Resulting Secondary Lands

    SciTech Connect (OSTI)

    Hurtt, George; Chini, Louise Parsons; Frolking, Steve; Betts, Richard; Feddema, Johannes; Fischer, Gavin M.; Fisk, J.P.; Hibbard, Kathleen A.; Houghton, R. A.; Janetos, Anthony C.; Jones, C.; Kindermann, G.; Kinoshita, Tsuguki; Goldeweijk, Kees K.; Riahi, Keywan; Shevliakova, Elena; Smith, Steven J.; Stehfest, Eike; Thomson, Allison M.; Thornton, P.; Van Vuuren, Detlef; Wang, Y.

    2011-08-08T23:59:59.000Z

    In preparation for the fifth Assessment Report (AR5) of the Intergovernmental Panel on Climate Change (IPCC), the international community is developing new advanced Earth System Models (ESM) to assess the combined effects of human activities (e.g. land use and fossil fuel emissions) on the carbon-climate system. In addition, four Representative Concentration Pathway (RCP) scenarios of the future (2005-2100) are being provided by four Integrated Assessment Model (IAM) teams to be used as input to the ESMs for future carbon-climate projections (Moss et al., 2010). The diversity of approaches and requirements among IAMs and ESMs for tracking land-use change, along with the dependence of model projections on land-use history, presents a challenge for effectively passing data between these communities and for smoothly transitioning from the historical estimates to future projections. Here, a harmonized set of land-use scenarios are presented that smoothly connects historical reconstructions of land use with future projections, in the format required by ESMs.

  7. Environmental assessment of remedial action at the Spook uranium mill tailings site, Converse County, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1989-04-01T23:59:59.000Z

    This document assesses a joint remedial action proposed by the US Department of Energy Uranium Mill Tailings Remedial Action Project and the State of Wyoming Abandoned Mine Lands Program. The proposed action would consist of stabilizing uranium mill tailings and other associated contaminated materials within an inactive open pit mine on the site; backfilling the open pit with overburden materials that would act as a radon barrier and cover; and recontouring and seeding all disturbed areas to premining conditions. The impacts of no action at this site are addressed as the alternative to the proposed action. 74 refs., 12 figs., 19 tabs.

  8. Triple acting radial seal

    DOE Patents [OSTI]

    Ebert, Todd A (West Palm Beach, FL); Carella, John A (Jupiter, FL)

    2012-03-13T23:59:59.000Z

    A triple acting radial seal used as an interstage seal assembly in a gas turbine engine, where the seal assembly includes an interstage seal support extending from a stationary inner shroud of a vane ring, the interstage seal support includes a larger annular radial inward facing groove in which an outer annular floating seal assembly is secured for radial displacement, and the outer annular floating seal assembly includes a smaller annular radial inward facing groove in which an inner annular floating seal assembly is secured also for radial displacement. A compliant seal is secured to the inner annular floating seal assembly. The outer annular floating seal assembly encapsulates the inner annular floating seal assembly which is made from a very low alpha material in order to reduce thermal stress.

  9. LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH’S UINTA BASIN

    SciTech Connect (OSTI)

    Keiter, Robert; Ruple, John; Holt, Rebecca; Tanana, Heather; McNeally, Phoebe; Tribby, Clavin

    2012-10-01T23:59:59.000Z

    Utah is rich in oil shale and oil sands resources. Chief among the challenges facing prospective unconventional fuel developers is the ability to access these resources. Access is heavily dependent upon land ownership and applicable management requirements. Understanding constraints on resource access and the prospect of consolidating resource holdings across a fragmented management landscape is critical to understanding the role Utah’s unconventional fuel resources may play in our nation’s energy policy. This Topical Report explains the historic roots of the “crazy quilt” of western land ownership, how current controversies over management of federal public land with wilderness character could impact access to unconventional fuels resources, and how land exchanges could improve management efficiency. Upon admission to the Union, the State of Utah received the right to title to more than one-ninth of all land within the newly formed state. This land is held in trust to support public schools and institutions, and is managed to generate revenue for trust beneficiaries. State trust lands are scattered across the state in mostly discontinuous 640-acre parcels, many of which are surrounded by federal land and too small to develop on their own. Where state trust lands are developable but surrounded by federal land, federal land management objectives can complicate state trust land development. The difficulty generating revenue from state trust lands can frustrate state and local government officials as well as citizens advocating for economic development. Likewise, the prospect of industrial development of inholdings within prized conservation landscapes creates management challenges for federal agencies. One major tension involves whether certain federal public lands possess wilderness character, and if so, whether management of those lands should emphasize wilderness values over other uses. On December 22, 2010, Secretary of the Interior Ken Salazar issued Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Order’s implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics — whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 — are unlikely to profoundly impact oil shale development within Utah’s Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those resources found in the southern part of the state. Management requirements independent of l

  10. Recovery Act Recipient Data | Department of Energy

    Office of Environmental Management (EM)

    Recovery Act Recipient Data Recovery Act Recipient Data A listing of all Recovery Act recipients and their allocations. Updated weekly. recoveryactfunding.xls More Documents &...

  11. Policy message Access to land and land rights,

    E-Print Network [OSTI]

    Richner, Heinz

    agriculture can reduce land deg- radation, support agricultural development, and mitigate rural poverty conservation tech- niques by producing food, fodder, fibre, or fuel. · Sustainable farming practices produce

  12. Land Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your Home asLCLSLaboratoryRowland to receiveLand Management About

  13. Uranium Mill Tailings Radiation Control Act of 1978

    SciTech Connect (OSTI)

    Magee, J.

    1980-01-01T23:59:59.000Z

    The long-term environmental effects of the Uranium Mill Tailings Radiation Control Act of 1978 address the public health hazards of radioactive wastes and recognize the significance of this issue to public acceptance of nuclear energy. Title I of the Act deals with stabilizing and controlling mill tailings at inactive sites and classifies the sites by priority. It represents a major Federal commitment. Title II changes and strengthens Nuclear Regulatory Commission authority, but it will have little overall impact. It is not possible to assess the Act's effect because there is no way to know if current technology will be adequate for the length of time required. 76 references. (DCK)

  14. The effects of the sequence of land development on the property valuation and taxation of Bryan, Texas

    E-Print Network [OSTI]

    Sorensen, Gary Lynn

    1971-01-01T23:59:59.000Z

    reasons. First, the assessing rrethod is more defined and more uniformly standard. Second, the city lists separate valuations for land and improvements. 1970, Cit -Land Briefly reviewing the assessment method, the land value is calculated...'IHE ~ OF THE SEQUENCE OF IAND DEVEIDPMENT ON THE PROPERTY VALUATION AND TAXATION OF BRYAN, TEXAS A Thesis Submitted to the Graduate College of Texas %&1 University in partial fulfi11rrent of the reguireaents for the degree of MASTER...

  15. Double acting bit holder

    DOE Patents [OSTI]

    Morrell, Roger J. (Blommington, MN); Larson, David A. (Minneapolis, MN); Ruzzi, Peter L. (Eagan, MN)

    1994-01-01T23:59:59.000Z

    A double acting bit holder that permits bits held in it to be resharpened during cutting action to increase energy efficiency by reducing the amount of small chips produced. The holder consist of: a stationary base portion capable of being fixed to a cutter head of an excavation machine and having an integral extension therefrom with a bore hole therethrough to accommodate a pin shaft; a movable portion coextensive with the base having a pin shaft integrally extending therefrom that is insertable in the bore hole of the base member to permit the moveable portion to rotate about the axis of the pin shaft; a recess in the movable portion of the holder to accommodate a shank of a bit; and a biased spring disposed in adjoining openings in the base and moveable portions of the holder to permit the moveable portion to pivot around the pin shaft during cutting action of a bit fixed in a turret to allow front, mid and back positions of the bit during cutting to lessen creation of small chip amounts and resharpen the bit during excavation use.

  16. Wellhead Protection Area Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This section regulates activities which can occur on or below the land surface of the area surrounding a wellhead. The purpose of these regulations is to limit well contamination and preserve...

  17. Florida Water Resources Act (Florida)

    Broader source: Energy.gov [DOE]

    It is the policy of the state of Florida: (a) To provide for the management of water and related land resources; (b) To promote the conservation, replenishment, recapture, enhancement, development,...

  18. Land-use transition for bioenergy and climate stabilization: model comparison of drivers, impacts and interactions with other land use based mitigation options

    SciTech Connect (OSTI)

    Popp, Alexander; Rose, Steven K.; Calvin, Katherine V.; Van Vuuren, Detlef; Dietrich, Jan P.; Wise, Marshall A.; Stehfest, Eike; Humpenoder, Florian; Kyle, G. Page; Van Vliet, Jasper; Bauer, Nico; Lotze-Campen, Hermann; Klein, David; Kriegler, Elmar

    2014-04-01T23:59:59.000Z

    This study is a model comparison assessing the drivers and impacts of bioenergy production on the global land system and the interaction with other land use based mitigation options in the context of the EMF 27 project. We compare and evaluate results from three integrated assessment models (GCAM, IMAGE, and ReMIND/MAgPIE). All three models project that dedicated bioenergy crops and biomass residues are a potentially important and cost-effective component of the energy system. But bioenergy deployment levels and feedstock composition vary notably across models as do the implications for land-use and greenhouse gas emissions and the interaction with other land use based mitigation measures. Despite numerous model differences, we identify a few that are likely contributing to differences in land-use and emissions attributable to energy crop deployment.

  19. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    three Recovery Act-funded Smart Grid Investment Grant (SGIG) projects. February 28, 2014 Smart Meter Investments Yield Positive Results in Maine Central Maine Power's (CMP) SGIG...

  20. Coal Mine Safety Act (Virginia)

    Broader source: Energy.gov [DOE]

    This Act is the primary legislation pertaining to coal mine safety in Virginia. It contains information on safety rules, safety standards and required certifications for mine workers, prohibited...

  1. Green Energy Act (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    The Green Energy Act was created to expand Ontario's production of renewable energy, encourage energy conservation and promote the creation of clean-energy green jobs.

  2. Montana Dam Safety Act (Montana)

    Broader source: Energy.gov [DOE]

    This Act establishes the state's interest in the construction of dams for water control and regulation and for hydropower generation purposes. It regulates dam construction, operation, and...

  3. Water Pollution Control Act (Minnesota)

    Broader source: Energy.gov [DOE]

    This Act gives the Minnesota Pollution Control Agency broad responsibility to establish pollution standards for state waters; monitor water conditions and sources of pollution; review construction,...

  4. Solid Waste Management Act (Pennsylvania)

    Broader source: Energy.gov [DOE]

    This Act provides for the planning and regulation of solid waste storage, collection, transportation, processing, treatment, and disposal. It requires that municipalities submit plans for municipal...

  5. Solid Waste Management Act (Oklahoma)

    Broader source: Energy.gov [DOE]

    This Act establishes rules for the permitting, posting of security, construction, operation, closure, maintenance and remediation of solid waste disposal sites; disposal of solid waste in ways that...

  6. Massachusetts Clean Waters Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    This Act establishes a Division of Water Pollution Control within the Massachusetts Department of Environmental Protection. The Division is responsible for establishing a program for the prevention...

  7. Georgia Hazardous Waste Management Act

    Broader source: Energy.gov [DOE]

    The Georgia Hazardous Waste Management Act (HWMA) describes a comprehensive, Statewide program to manage hazardous wastes through regulating hazardous waste generation, transportation, storage,...

  8. Water Quality Control Act (Tennessee)

    Broader source: Energy.gov [DOE]

    The Water Quality Control Act (WQCA) establishes the water pollution control program. The WQCA identifies the responsibilities and extent of authority for the Commissioner of the Water Quality...

  9. Recovery Act State Memos Florida

    Energy Savers [EERE]

    of renewable energy. The Florida Energy and Climate Commission has awarded the Florida Solar Energy Center (FSEC) 10 million in Recovery Act money, enabling the center to set...

  10. Ground Water Management Act (Virginia)

    Broader source: Energy.gov [DOE]

    Under the Ground Water Management Act of 1992, Virginia manages ground water through a program regulating the withdrawals in certain areas called Ground Water Management Areas (GWMA). Currently,...

  11. Florida Coastal Management Act (Florida)

    Broader source: Energy.gov [DOE]

    This Act is intended to provide for the development of natural, commercial, recreational, ecological, industrial, and aesthetic resources, including, but not limited to, energy facilities, of...

  12. Montana Environmental Policy Act (Montana)

    Broader source: Energy.gov [DOE]

    The Montana Environmental Policy Act aims to provide for the consideration of environmental impacts by the legislature when enacting laws, and for public transparency regarding the possible...

  13. Hazardous Sites Cleanup Act (Pennsylvania)

    Broader source: Energy.gov [DOE]

    This Act tasks the Pennsylvania Department of Environmental Protection with regulating hazardous waste. The department is charged with siting, review, permitting and development of hazardous waste...

  14. Freedom of Information Act FOIA 10CFR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Freedom of Information Act Freedom of Information Act Regulations Code of Federal Regulations (CFR) for the Freedom of Information Act is 10 CFR 1004 THE FREEDOM OF INFORMATION ACT...

  15. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental Assessments (EA)Budget(DANCE) TargetFormsTrouble ShootingFredFOIA

  16. National Environmental Policy Act (NEPA) Categorically Excluded...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management System NEPA National Environmental Policy Act (NEPA) Categorically Excluded Actions National Environmental Policy Act (NEPA) Categorically Excluded...

  17. Title: Canada Land Inventory: Land Capability for Forestry Data Creator /

    E-Print Network [OSTI]

    Title: Canada Land Inventory: Land Capability for Forestry Data Creator / Copyright Owner: National Archives of Canada, Visual and Sound Archives Division; Publisher: National Archives of Canada, Visual and Sound Archives Division; developed under the auspices of Environment Canada; distributed by Natural

  18. Title: Canada Land Inventory: 1966 Land Use Data Creator /

    E-Print Network [OSTI]

    Title: Canada Land Inventory: 1966 Land Use Data Creator / Copyright Owner: National Archives of Canada, Visual and Sound Archives Division Publisher: National Archives of Canada, Visual and Sound Archives Division; developed under the auspices of Environment Canada; distributed by Natural Resources

  19. REMOTE SENSING TECHNIQUES FOR LAND USE CLASSIFICATION OF RIO JAUCA WATERSHED USING IKONOS IMAGES

    E-Print Network [OSTI]

    Gilbes, Fernando

    REMOTE SENSING TECHNIQUES FOR LAND USE CLASSIFICATION OF RIO JAUCA WATERSHED USING IKONOS IMAGES-Mayagüez E-mail: edwinmm80@yahoo.com Key words: GIS, remote sensing, land use, supervised classification resource and supplies water to the metropolitan area. Remote sensing techniques can be used to assess

  20. Center for Environmental Management of Military Lands (970) 491-2748 cemml@cemml.colostate.edu

    E-Print Network [OSTI]

    , Environmental and Biological Assessments, and Environmental Impact Statements. Sustaining a realistic military) and Environmental Impact Statements (EIS) are prepared to identify, consider, and resolve environmental problemsCenter for Environmental Management of Military Lands (970) 491-2748 · cemml

  1. Fire dynamics during the 20th century simulated by the Community Land Model

    E-Print Network [OSTI]

    Kloster, S.; Mahowald, N. M.; Randerson, J. T.; Thornton, P. E.; Hoffman, F. M.; Levis, Samuel; Lawrence, Peter J.; Feddema, Johannes J.; Oleson, Keith W.; Lawrence, David M.

    2010-01-01T23:59:59.000Z

    Fire is an integral Earth System process that interacts with climate in multiple ways. Here we assessed the parametrization of fires in the Community Land Model (CLM-CN) and improved the ability of the model to reproduce ...

  2. Land O'Lakes Shaves Gas Usage through Steam System In-Plant Training

    Broader source: Energy.gov [DOE]

    Twelve participants from 6 different facilities learned and practiced energy efficiency assessment skills during the recent in-plant training at a Land O'Lakes dairy plant in Carlisle, Pennsylvania...

  3. Bus Rapid Transit Impacts on Land Uses and Land Values in Seoul, Korea

    E-Print Network [OSTI]

    Cervero, Robert; Kang, Chang Deok

    2009-01-01T23:59:59.000Z

    an ambitious campaign of land reclamation, taking valuablehub of Seoul’s ambitious land reclamation and redevelopment

  4. India-Vulnerability Assessment and Enhancing Adaptive Capacities...

    Open Energy Info (EERE)

    and Cooperation Sector Energy, Land, Water Focus Area Agriculture Topics Co-benefits assessment, Background analysis Resource Type Lessons learnedbest practices Website...

  5. assess soil degradation: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    habitats, soil animals, land use and soil conservation. Includes teacher-tested lesson plans, assessment methods and suggestions for further study. Integrates science with...

  6. Free, Prior and Informed Consent (FPIC) : does it give indigenous peoples more control over development of their lands in the Philippines?

    E-Print Network [OSTI]

    Co, Ronilda R. (Ronilda Rosario)

    2008-01-01T23:59:59.000Z

    The 1998 Indigenous Peoples Rights Act (IPRA) grants indigenous peoples (IPs) in the Philippines the right to Free, Prior, and Informed Consent (FPIC) with regard to development projects undertaken on their ancestral lands. ...

  7. Temporal Land Cover Analysis for Net Ecosystem Improvement

    SciTech Connect (OSTI)

    Ke, Yinghai; Coleman, Andre M.; Diefenderfer, Heida L.

    2013-04-09T23:59:59.000Z

    We delineated 8 watersheds contributing to previously defined river reaches within the 1,468-km2 historical floodplain of the tidally influenced lower Columbia River and estuary. We assessed land-cover change at the watershed, reach, and restoration site scales by reclassifying remote-sensing data from the National Oceanic and Atmospheric Administration Coastal Change Analysis Program’s land cover/land change product into forest, wetland, and urban categories. The analysis showed a 198.3 km2 loss of forest cover during the first 6 years of the Columbia Estuary Ecosystem Restoration Program, 2001–2006. Total measured urbanization in the contributing watersheds of the estuary during the full 1996-2006 change analysis period was 48.4 km2. Trends in forest gain/loss and urbanization differed between watersheds. Wetland gains and losses were within the margin of error of the satellite imagery analysis. No significant land cover change was measured at restoration sites, although it was visible in aerial imagery, therefore, the 30-m land-cover product may not be appropriate for assessment of early-stage wetland restoration. These findings suggest that floodplain restoration sites in reaches downstream of watersheds with decreasing forest cover will be subject to increased sediment loads, and those downstream of urbanization will experience effects of increased impervious surfaces on hydrologic processes.

  8. Facilitating Oil Industry Access to Federal Lands through Interagency Data Sharing

    SciTech Connect (OSTI)

    Paul Jehn; Ben Grunewald

    2007-05-31T23:59:59.000Z

    Much of the environmental and technical data useful to the oil and gas industry and regulatory agencies is now contained in disparate state and federal databases. Delays in coordinating permit approvals between federal and state agencies translate into increased operational costs and stresses for the oil and gas industry. Making federal lease stipulation and area restriction data available on state agency Web sites will streamline a potential lessors review of available leases, encourage more active bidding on unleased federal lands, and give third-party operators independent access to data who otherwise may not have access to lease restrictions and other environmental data. As a requirement of the Energy Policy Conservation Act (EPCA), the Bureau of Land Management (BLM) is in the process of inventorying oil and natural gas resources beneath onshore federal lands and the extent and nature of any stipulation, restrictions, or impediments to the development of these resources. The EPCA Phase 1 Inventory resulted in a collection of GIS coverage files organized according to numerous lease stipulation reference codes. Meanwhile, state agencies also collect millions of data elements concerning oil and gas operations. Much of the oil and gas data nationwide is catalogued in the Ground Water Protection Council's (GWPC's) successfully completed Risk Based Data Management System (RBDMS). The GWPC and the states of Colorado, New Mexico, Utah, and Montana are implementing a pilot project where BLM lease stipulation data and RBDMS data will be displayed in a GIS format on the Internet. This increased access to data will increase bid activity, help expedite permitting, and encourage exploration on federal lands. Linking environmental, lease stipulation and resource inventory assessment data and making a GIS interface for the data available to industry and other agencies via the internet represents an important step in the GWPC strategy for all oil and gas regulatory e-commerce. The next step beyond mere data sharing for facilitating the permitting process is to make it possible for industry to file those permit applications electronically. This process will involve the use of common XML schemas.

  9. Oil and Gas on Public Lands (Texas)

    Broader source: Energy.gov [DOE]

    The School Land Board may choose to lease lands for the production of oil and natural gas, on the condition that oil and gas resources are leased together and separate from other minerals. Lands...

  10. Hanford land disposal restrictions plan for mixed wastes

    SciTech Connect (OSTI)

    Not Available

    1990-10-01T23:59:59.000Z

    Since the early 1940s, the Hanford Site has been involved in the production and purification of nuclear defense materials. These production activities have resulted in the generation of large quantities of liquid and solid radioactive mixed waste. This waste is subject to regulation under authority of both the Resource Conservation and Recovery Act of 1976 (RCRA) and the Atomic Energy Act. The State of Washington Department of Ecology (Ecology), the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) have entered into an agreement, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) to bring Hanford Site Operations into compliance with dangerous waste regulations. The Tri-Party Agreement was amended to require development of the Hanford Land Disposal Restrictions Plan for Mixed Wastes (this plan) to comply with land disposal restrictions requirements for radioactive mixed waste. The Tri-Party Agreement requires, and the this plan provides, the following sections: Waste Characterization Plan, Storage Report, Treatment Report, Treatment Plan, Waste Minimization Plan, a schedule, depicting the events necessary to achieve full compliance with land disposal restriction requirements, and a process for establishing interim milestones. 34 refs., 28 figs., 35 tabs.

  11. Texas Clean Air Act (Texas)

    Broader source: Energy.gov [DOE]

    This Act is designed to safeguard the state's air resources from pollution by requiring the control and abatement of air pollution and emissions of air contaminants, consistent with the protection...

  12. Tennessee Air Quality Act (Tennessee)

    Broader source: Energy.gov [DOE]

    The Tennessee Air Quality Act (AQA) delegates the power to maintain air quality in the State to the Department of Environment and Conservation. Under the Department of the Environment and...

  13. Renewable Energy Act (New Mexico)

    Broader source: Energy.gov [DOE]

    The purposes of the Renewable Energy Act are to prescribe the amounts of renewable energy resources that public utilities shall include in their electric energy supply portfolios for sales to...

  14. Water Quality Act (New Mexico)

    Broader source: Energy.gov [DOE]

    This act establishes the Water Quality Control Commission and states the powers and duties of the commission. Rules are stated for adoption of regulations and standards and information is provided...

  15. Nuclear Decommissioning Financing Act (Maine)

    Broader source: Energy.gov [DOE]

    The Nuclear Decommissioning Financing Act calls for the establishment of a tax-exempt, tax-deductible decommissioning fund by the licensee of any nuclear power generating facility to pay for the...

  16. Georgia Radiation Control Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Georgia Radiation Control Act is designed to prevent any associated harmful effects upon the environment or the health and safety of the public through the institution and maintenance of a...

  17. Toxic Pollution Prevention Act (Illinois)

    Broader source: Energy.gov [DOE]

    It is the purpose of this Act to reduce the disposal and release of toxic substances which may have adverse and serious health and environmental effects, to promote toxic pollution prevention as...

  18. Toxics Use Reduction Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    This Act, revised significantly in 2006, seeks to mitigate the use of toxic substances and the production of toxic byproducts through reporting requirements as well as resource conservation plans...

  19. Montana Hazardous Waste Act (Montana)

    Broader source: Energy.gov [DOE]

    This Act addresses the safe and proper management of hazardous wastes and used oil, the permitting of hazardous waste facilities, and the siting of facilities. The Department of Environmental...

  20. Efficient Use of Energy Act

    Broader source: Energy.gov [DOE]

    The Efficient Use of Energy Act of 2005 allows public electric and natural gas utilities to implement cost-effective energy-reduction programs. The programs may be funded through a tariff rider for...

  1. Coastal Facilities Review Act (Maryland)

    Broader source: Energy.gov [DOE]

    This Act aims to preserve Maryland's coastal areas and to balance competing demands for resources by requiring environmental impact evaluations to be conducted prior to the approval of the...

  2. Niobrara Scenic River Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act establishes the Niobrara Council, to assist in all aspects of the management of the Niobrara scenic river corridor and promulgate rules and regulations related to the preservation of the...

  3. Final Environmental assessment for the Uranium Lease Management Program

    SciTech Connect (OSTI)

    NONE

    1995-07-01T23:59:59.000Z

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  4. Short term effects of moderate carbon prices on land use in the New Zealand emissions trading

    E-Print Network [OSTI]

    Silver, Whendee

    Short term effects of moderate carbon prices on land use in the New Zealand emissions trading Zealand Emissions Trading Scheme (NZ ETS) was introduced through the Climate Change Response Act............................................................................ 14 #12;1 1 Introduction The New Zealand Emissions Trading Scheme (NZ ETS) was legislated through

  5. Minerals on Public Lands (Texas)

    Broader source: Energy.gov [DOE]

    Any tract of land that belongs to the state, including islands, salt and freshwater lakes, bays, inlets, marshes, and reefs owned by the state within tidewater limits, the part of the Gulf of...

  6. Riparian Rights: State Land (Indiana)

    Broader source: Energy.gov [DOE]

    The state reserves the power to sell, transfer, and convey, as provided by law, rights-of-way in public land for several purposes, including pipelines, gas pipelines, water pipelines, sewer lines,...

  7. Land and Facility Use Planning

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-07-09T23:59:59.000Z

    The Land and Facility Use Planning process provides a way to guide future site development and reuse based on the shared long-term goals and objectives of the Department, site and its stakeholders. Does not cancel other directives.

  8. Georgia Water Quality Control Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Georgia Water Quality Control Act (WQCA) is a set of environmental regulations and permitting requirements that comply with the federal Clean Water Act. The Georgia Water Quality Control Act...

  9. Arbeidslivets lover Act relating to working environment,

    E-Print Network [OSTI]

    Johansen, Tom Henning

    Arbeidslivets lover Act relating to working environment, working hours and employment protection, etc. (Working Environment Act). as subsequently amended, last by the Act of 14. December 2012 No. 80.notification................................................................... 6 Chapter 3. Working environment measures..................................... 6 Section.3

  10. Assessment of Farmland Hosting Renewable Energy Systems

    Broader source: Energy.gov [DOE]

    In New Jersey, under the Farmland Assessment Act, farmland actively devoted to an agricultural or horticultural use is assessed at its productivity value. This practice generally results in a lower...

  11. UK Climate Change Risk Assessment and National

    E-Print Network [OSTI]

    Wirosoetisno, Djoko

    UK Climate Change Risk Assessment and National Adaptation Programme Meg Patel Defra #12 change #12;Weather & climate impacts - economic, societal, environmental Water consumption per capita;Legislative Framework Climate Change Act 2008 Adaptation Reporting Power 2011 Climate Change Risk Assessment

  12. GEORGIA RECOVERY ACT SNAPSHOT | Department of Energy

    Energy Savers [EERE]

    ACT SNAPSHOT Georgia has substantial natural resources, including biomass and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down...

  13. Kathleen Carlson Appointed Interim Acting Deputy Administrator...

    National Nuclear Security Administration (NNSA)

    Interim Acting Deputy Administrator for Defense Programs Press Release Aug 16, 2001 Kathleen Carlson Appointed Interim Acting Deputy Administrator for Defense Programs...

  14. Safety of Dams and Reservoirs Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act regulates dams and associated reservoirs to protect health and public safety and minimize adverse consequences associated with potential dam failure. The act describes the responsibilities...

  15. Virginia Electric Utility Regulation Act (Virginia)

    Broader source: Energy.gov [DOE]

    The Virginia Electric Utility Regulation Act constitutes the main legislation in Virginia that pertains to the regulation of the state's electric utilities. The Act directs the State Corporation...

  16. ARKANSAS RECOVERY ACT SNAPSHOT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARKANSAS RECOVERY ACT SNAPSHOT Arkansas has substantial natural resources, including gas, oil, wind, biomass, and hydroelectric power. The American Recovery & Reinvestment Act...

  17. Global Climate Change,Global Climate Change, Land Cover Change, andLand Cover Change, and

    E-Print Network [OSTI]

    1 Global Climate Change,Global Climate Change, Land Cover Change, andLand Cover Change Changes · Due to ­ Climate Change ­ Land Cover / Land Use Change ­ Interaction of Climate and Land Cover Change · Resolution ­ Space ­ Time Hydro-Climatic Change · Variability vs. Change (Trends) · Point data

  18. US Fish and Wildlife Service lands biomonitoring operations manual

    SciTech Connect (OSTI)

    Rope, R.C.; Breckenridge, R.P.

    1993-08-01T23:59:59.000Z

    This is Volume 1 of an operations manual designed to facilitate the development of biomonitoring strategies for U.S. Fish and Wildlife Service Lands. It is one component of the U.S. Fish and Wildlife Service Lands Biomonitoring Operations Manual. The Volume contains the Introduction to the Manual, background information on monitoring, and procedures for developing a biomonitoring strategy for Service lands. The purpose of the Biomonitoring Operations Manual is to provide an approach to develop and implement biomonitoring activities to assess the status and trends of U.S. Fish and Wildlife Service trust resources. It also provides field sampline methods and documentation protocols for contaminant monitoring activities. The strategy described in the Manual has been designed as a stand alone process to characterize the presence of contaminants on lands managed by the Service. This process can be sued to develop a monitoring program for any tract of real estate with potential threats from on- or off-site contaminants. Because the process was designed to address concerns for Service lands that span the United States from Alaska to the Tropical Islands, it has a generic format that can be used in al types of ecosystems, however, significant site specific informtion is required to complete the Workbook and make the process work successfully.

  19. Assessing and Communicating the Loss of Biodiversity and

    E-Print Network [OSTI]

    Schmidt, Matthias

    and Life Cycle Assessment (LCA). In combination they allow to better assess the ecological impact of land, Web Mapping, Regional Planning Tools and Life Cycle Assessment for Better Decision Support Organizers Tools & Web Mapping Remote Sensing Life Cycle Assessment (morning) Life Cycle Assessment (morning

  20. Recovery Act | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR -Department of Energy Recovery ActCategoryRecovery Act

  1. Federal Information Security Management Act: Fiscal Year 2014 Evaluation (IG-15-004, November 13, 2014)

    E-Print Network [OSTI]

    Waliser, Duane E.

    Federal Information Security Management Act: Fiscal Year 2014 Evaluation (IG-15-004, November 13) identified for this year's Federal Information Security Management Act (FISMA) review; however, the Agency Administrator, provides the Office of Inspector General's (OIG) independent assessment of NASA's information

  2. The defence of the Realm Acts (DORA) and the expansion of the British state, 1914-1921

    E-Print Network [OSTI]

    Klobas, Mark Brian

    1996-01-01T23:59:59.000Z

    decisions which would lead to greater efficiency impossible to carry out, Finally, existing resources, such as the Inland Revenue Land Valuation Department, were not used by the War Office and other agencies when assessing claims, something often...

  3. Analysis of Renewable Energy Potential on U. S. National Forest Lands

    SciTech Connect (OSTI)

    Zvolanek, E. [Environmental Science Division] [Environmental Science Division; Kuiper, J. [Environmental Science Division] [Environmental Science Division; Carr, A. [Environmental Science Division] [Environmental Science Division; Hlava, K.

    2013-12-13T23:59:59.000Z

    In 2005, the National Renewable Energy Laboratory (NREL) completed an assessment of the potential for solar and wind energy development on National Forest System (NFS) public lands managed by the US Department of Agriculture, U.S. Forest Service (USFS). This report provides an update of the analysis in the NREL report, and extends the analysis with additional siting factors for solar and wind energy. It also expands the scope to biomass and geothermal energy resources. Hydropower is acknowledged as another major renewable energy source on NFS lands; however, it was not analyzed in this project primarily because of the substantially different analysis that would be needed to identify suitable locations. Details about each renewable energy production technology included in the study are provided following the report introduction, including how each resource is converted to electrical power, and examples of existing power plants. The analysis approach was to use current and available Geographic Information System (GIS) data to map the distribution of the subject renewable energy resources, major siting factors, and NFS lands. For each major category of renewable energy power production, a set of siting factors were determined, including minimum levels for the renewable energy resources, and details for each of the other siting factors. Phase 1 of the analysis focused on replicating and updating the 2005 NREL analysis, and Phase 2 introduced additional siting factors and energy resources. Source data were converted to a cell?based format that helped create composite maps of locations meeting all the siting criteria. Acreages and potential power production levels for NFS units were tabulated and are presented throughout this report and the accompanying files. NFS units in the southwest United States were found to have the most potentially suitable land for concentrating solar power (CSP), especially in Arizona and New Mexico. In total, about 136,032 acres of NFS lands were found potentially suitable for CSP development, potentially yielding as much as 13,603 megawatts (MW) of electricity, assuming 10 acres per MW. For photovoltaic solar power (PV), the top NFS units were more widely distributed than CSP. Notably, more than 150,000 acres in Comanche National Grassland in Colorado were found to be potentially suitable for PV development, accounting for more than 25% of the potentially suitable NFS lands combined. In total, about 564,698 acres of NFS lands were found potentially suitable for PV development, potentially yielding as much as 56,469 MW of electricity, assuming 10 acres per MW. NFS units most suitable for wind power are concentrated in the northern Great Plains. In total, about 3,357,792 acres of NFS lands were found potentially suitable for wind development, potentially yielding as much as 67,156 MW of electricity, assuming 50 acres per MW. Of that area, 571,431 acres (11,429 MW) are located within the Bankhead?Jones Farm Tenant Act Land in Montana. NFS lands in Alaska have considerable wind resources, but other siting factors eliminated almost the entire area. The southwest coast of Chugach National Forest, near Seward, Alaska, maintains the majority of the remaining acreage. NFS units with highly suitable biomass resources are located from Idaho to Louisiana. In total, about 13,967,077 acres of NFS lands are potentially highly suitable for biomass from logging and thinning residue development. Of that, 1,542,247 acres is located in Fremont?Winema National Forest in Oregon. Not surprisingly, most NFS units have at least some level of potentially suitable biomass resources. In general, biomass resources such as these could significantly offset consumption of coal and petroleum?based fuels. NFS units deemed potentially highly suitable for enhanced geothermal system (EGS) development were distributed widely from California to Virginia, accounting for some 6,475,459 acres. Mark Twain National Forest in Missouri has the largest area of all the NFS units, with 900,637 acres. While more rigorous studies are needed

  4. Gathering Data to Assess Your Watershed

    E-Print Network [OSTI]

    Conservation Districts and USDA NRCS Agricultural Land Use Information Soil Surveys Erosion Control Information and Wastewater Planning and Assessments Population Projections TNRIS Data from State Agencies Railroad Commission US Department of Agriculture (USDA) Agricultural Census Data USDA Natural Resources Conservation

  5. Gathering Data to Assess Your Watershed

    E-Print Network [OSTI]

    Conservation Districts and USDA NRCS Agricultural Land Use Information Soil Surveys Erosion Control Information Water and Wastewater Planning and Assessments Population Projections Railroad Commission (RRC) Oil Agencies US Department of Agriculture (USDA) Agricultural Census Data USDA Natural Resources Conservation

  6. Coal conversion siting on coal mined lands: water quality issues

    SciTech Connect (OSTI)

    Triegel, E.K.

    1980-01-01T23:59:59.000Z

    The siting of new technology coal conversion facilities on land disturbed by coal mining results in both environmental benefits and unique water quality issues. Proximity to mining reduces transportation requirements and restores disrupted land to productive use. Uncertainties may exist, however, in both understanding the existing site environment and assessing the impact of the new technology. Oak Ridge National Laboratory is currently assessing the water-related impacts of proposed coal conversion facilities located in areas disturbed by surface and underground coal mining. Past mining practices, leaving highly permeable and unstable fill, may affect the design and quality of data from monitoring programs. Current mining and dewatering, or past underground mining may alter groundwater or surface water flow patterns or affect solid waste disposal stability. Potential acid-forming material influences the siting of waste disposal areas and the design of grading operations. These and other problems are considered in relation to the uncertainties and potentially unique problems inherent in developing new technologies.

  7. System analysis of shallow land burial. Volume 2: technical background. Technical report, 26 November 1979-23 January 1981

    SciTech Connect (OSTI)

    Lester, D.; Buckley, D.; Donelson, S.; Dura, V.; Hecht, M.

    1981-03-01T23:59:59.000Z

    This is volume two of a three volume set detailing the activities and results of the System Analysis of Shallow Land Burial Project. Activities under four project tasks are described: Task 1 - Identify Potential Radionuclide Release Pathways, Task 2 - Systems Model for Shallow Land Burial of Low-Level Waste, Task 3 - Sensitivity and Optimization Study and Task 4 - Reference Facility Dose Assessment.

  8. Land-Use Requirements for Solar Power Plants in the United States

    SciTech Connect (OSTI)

    Ong, S.; Campbell, C.; Denholm, P.; Margolis, R.; Heath, G.

    2013-06-01T23:59:59.000Z

    This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As of the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.

  9. 2011LandesBioscience. Donotdistribute.

    E-Print Network [OSTI]

    /November/December 2011; © 2011 Landes Bioscience MethODs & techNicaL aDvaNces MethODs & techNicaL a of the GFP- or YFP-expressing balancers has specific advantages, but all share a common draw- back a Tubby1 (Tb1 ) dominant transgene. Flies heterozygous for these FM7a and CyO derivatives exhibit

  10. An update on land-ice modeling in the CESM

    SciTech Connect (OSTI)

    Lipscomb, William H [Los Alamos National Laboratory

    2011-01-18T23:59:59.000Z

    Mass loss from land ice, including the Greenland and Antarctic ice sheets as well as smaller glacier and ice caps, is making a large and growing contribution to global sea-level rise. Land ice is only beginning to be incorporated in climate models. The goal of the Land Ice Working Group (LIWG) is to develop improved land-ice models and incorporate them in CESM, in order to provide useful, physically-based sea-level predictions. LJWG efforts to date have led to the inclusion of a dynamic ice-sheet model (the Glimmer Community Ice Sheet Model, or Glimmer-CISM) in the Community Earth System Model (CESM), which was released in June 2010. CESM also includes a new surface-mass-balance scheme for ice sheets in the Community Land Model. Initial modeling efforts are focused on the Greenland ice sheet. Preliminary results are promising. In particular, the simulated surface mass balance for Greenland is in good agreement with observations and regional model results. The current model, however, has significant limitations: The land-ice coupling is one-way; we are using a serial version of Glimmer-CISM with the shallow-ice approximation; and there is no ice-ocean coupling. During the next year we plan to implement two-way coupling (including ice-ocean coupling with a dynamic Antarctic ice sheet) with a parallel , higher-order version of Glimmer-CISM. We will also add parameterizations of small glaciers and ice caps. With these model improvements, CESM will be able to simulate all the major contributors to 21st century global sea-level rise. Results of the first round of simulations should be available in time to be included in the Fifth Assessment Report (ARS) of the Intergovernmental Panel on Climate Change.

  11. Clean Air Act. Revision 5

    SciTech Connect (OSTI)

    Not Available

    1994-02-15T23:59:59.000Z

    This Reference Book contains a current copy of the Clean Air Act, as amended, and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. This Reference Book has been completely revised and is current through February 15, 1994.

  12. Minerals on School and Public Lands

    Broader source: Energy.gov [DOE]

    The Commissioner of School and Public Lands is authorized to lease the mineral interests of such lands for development. Section 5-7 of the SD Codified Laws describes provisions for the leasing of...

  13. Marginal, Erodible Land Retirement Policy (Minnesota)

    Broader source: Energy.gov [DOE]

    It is state policy to encourage the retirement of marginal, highly erodible land, particularly land adjacent to public waters and drainage systems, from crop production and to reestablish a cover...

  14. Addressing land-based discrimination in

    E-Print Network [OSTI]

    Richner, Heinz

    , feudalism was based on ownership of land, the dominant mode of production. Political power was dominated by absolute kings and feudal overlords. Wealth and position in society was derived from the land ownership

  15. Economic and Physical Modeling of Land Use in GCAM 3.0 and an Application to Agricultural Productivity, Land, and Terrestrial Carbon

    SciTech Connect (OSTI)

    Wise, Marshall A.; Calvin, Katherine V.; Kyle, G. Page; Luckow, Patrick; Edmonds, James A.

    2014-09-01T23:59:59.000Z

    We explore the impact of changes in agricultural productivity on global land use and terrestrial carbon using the new agriculture and land use modeling approach developed for Global Change Assessment Model (GCAM) version 3.0. This approach models economic land use decisions with regional, physical, and technological specificity while maintaining economic and physical integration with the rest of the GCAM model. Physical land characteristics and quantities are tracked explicitly, and crop production practices are modeled discretely to facilitate coupling with physical models. Economic land allocation is modeled with non-linear functions in a market equilibrium rather than through a constrained optimization. In this paper, we explore three scenarios of future agriculture productivity in all regions of the globe over this century, ranging from a high growth to a zero growth level. The higher productivity growth scenario leads to lower crop prices, increased production of crops in developing nations, preservation of global forested lands and lower terrestrial carbon emissions. The scenario with no productivity improvement results in higher crop prices, an expansion of crop production in the developed world, loss of forested lands globally, and higher terrestrial carbon emissions.

  16. Lease of Geothermal Resources on State Lands Act | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners and Wind EnergyIndiana: Energy ResourcesLeander Lake,Learned,on

  17. MCA 75-7-101 et seq - The Natural Streambed and Land Preservation Act of

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:LandownersLuther, Oklahoma: EnergyMAREC Jump to:2 - Air Quality Jump1975 |

  18. Federal Land Policy and Management Act of 1976 (FLPMA) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazelPennsylvania:57427°, -89.4742177° Show MapSubsidiesGuidelines |

  19. File:03-TX-g - Lease of Relinquishment Act Lands.pdf | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual1WAALandUsePlanning.pdf Jump to: navigation, search File FileInformation

  20. Mineral Leasing Act for Acquired Lands of 1947 | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDIT REPORTEnergyFarmsPower CoLongxingPartners LLC Place: Florida

  1. Alaska Statutes Chapter 38.5 Alaska Land Act | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEEAisin Seikiand Telephone Co (RedirectedInformation 35

  2. BLM - Federal Land Policy and Management Act of 1976 | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon, France: Energy Resources JumpPáginas

  3. Federal Land Policy and Management Act of 1976 | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 NoEurope BV JumpFederal Highway Administration Jump to:6 Jump to:

  4. Bioenergy and the importance of land use policy in a carbon-constrained world

    SciTech Connect (OSTI)

    Calvin, Katherine V.; Edmonds, James A.; Wise, Marshall A.

    2010-06-01T23:59:59.000Z

    Policies aimed at limiting anthropogenic climate change would result in significant transformations of the energy and land-use systems. However, increasing the demand for bioenergy could have a tremendous impact on land use, and can result in land clearing and deforestation. Wise et al. (2009a,b) analyzed an idealized policy to limit the indirect land use change emissions from bioenergy. The policy, while effective, would be difficult, if not impossible, to implement in the real world. In this paper, we consider several different land use policies that deviate from this first-best, using the Joint Global Change Research Institute’s Global Change Assessment Model (GCAM). Specifically, these new frameworks are (1) a policy that focuses on just the above-ground or vegetative terrestrial carbon rather than the total carbon, (2) policies that focus exclusively on incentivizing and protecting forestland, and (3) policies that apply an economic penalty on the use of biomass as a proxy to limit indirect land use change emissions. For each policy, we examine its impact on land use, land-use change emissions, atmospheric CO2 concentrations, agricultural supply, and food prices.

  5. Land Use Requirements of Modern Wind Power Plants in the United States

    SciTech Connect (OSTI)

    Denholm, P.; Hand, M.; Jackson, M.; Ong, S.

    2009-08-01T23:59:59.000Z

    This report provides data and analysis of the land use associated with modern, large wind power plants (defined as greater than 20 megawatts (MW) and constructed after 2000). The analysis discusses standard land-use metrics as established in the life-cycle assessment literature, and then discusses their applicability to wind power plants. The report identifies two major 'classes' of wind plant land use: 1) direct impact (i.e., disturbed land due to physical infrastructure development), and 2) total area (i.e., land associated with the complete wind plant project). The analysis also provides data for each of these classes, derived from project applications, environmental impact statements, and other sources. It attempts to identify relationships among land use, wind plant configuration, and geography. The analysts evaluated 172 existing or proposed projects, which represents more than 26 GW of capacity. In addition to providing land-use data and summary statistics, they identify several limitations to the existing wind project area data sets, and suggest additional analysis that could aid in evaluating actual land use and impacts associated with deployment of wind energy.

  6. Modification ofregional groundwater regimes by land reclamation

    E-Print Network [OSTI]

    Jiao, Jiu Jimmy

    Modification ofregional groundwater regimes by land reclamation Jiu Jimmy Jiao Department ofEarth Sciences, The University ofHong Kong, P. R. China Abstract JJ.Jiao Land reclamation has played;Bouchardetal., 1998;Schofield etal., 1992). While reclamation provides valuable land, it also creates various

  7. Pollutant Discharge Prevention and Control Act (Florida)

    Broader source: Energy.gov [DOE]

    The Department of Environmental Protection is responsible for enacting regulations to prevent and mitigate the release of pollutants into the land and waters of the state. This legislation...

  8. Recovery Act State Memos Idaho

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a number of schools with a combination of direct-use geothermal heating and ground-source heat pump systems to provide cooling. Award(s): 350,000, Industrial Assessment...

  9. Connecticut Environmental Policy Act (Connecticut)

    Broader source: Energy.gov [DOE]

    Environmental impact reports must be prepared for all proposed projects initiated by state agencies or funded in whole or in part by the state. Reports will assess the likely direct, indirect, and...

  10. FY 2008 E-Government Act Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 E-Government Act Report FY 2008 E-Government Act Report FY 2008 E-Government Act Report FY 2008 E-Government Act Report More Documents & Publications FY 2008 E-Government Act...

  11. an Recovery and Reinvestment Act of 20091 (Recovery Act) provides protections for cert

    E-Print Network [OSTI]

    Tam, Tin-Yau

    ors, subcontractors, grantees, or professional membership organizations acting in the interest ry Act vernmen ctors, sububbbbbcoonttraactctorors,s,s,s,s grantees, or proofofofofofesesesessisisis

  12. DOE Policy Re Recovery Act Recipient Use of Recovery Act Logos on Signage

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (“DOE”) policy regarding use of the Recovery Act logo by Recovery Act recipients and subgrantees.

  13. NH Acid Rain Control Act (New Hampshire)

    Broader source: Energy.gov [DOE]

    The Act is implemented under New Hampshire's acid deposition control program established under the Rules to Control Air Pollution in Chapter Env-A 400. The goal of the Act is to reduce emissions...

  14. Georgia Hazardous Site Response Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Georgia Hazardous Site Response Act is Georgia’s version of Superfund. The Act provides for graduated fees on the disposal of hazardous waste, a trust fund to enable the EPD to clean up or plan...

  15. Clean Air Act Amendments of 1990

    E-Print Network [OSTI]

    Hanneschlager, R. E.

    Congress is currently debating amendments to the Clean Air Act which would strengthen and enhance the current Clean Air Act. The bill would guarantee a reduction of 10 million tons of sulfur dioxide from 1980 levels; would sharply reduce pollutants...

  16. Public Waterfront Act- Chapter 91 (Massachusetts)

    Broader source: Energy.gov [DOE]

    This Act contains a number of regulations regarding the construction of structures and other activity near rivers, streams, harbors, and tidelands. Regulations pertaining to this Act can be found...

  17. District of Columbia Recovery Act State Memo

    Broader source: Energy.gov [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation’s energy and environmental future. The Recovery Act investments in the District of Columbia...

  18. NH Clean Power Act (New Hampshire)

    Broader source: Energy.gov [DOE]

    The Act calls for annual reductions of multiple pollutants, including SO2, Nox, CO2, and mercury. The Act calls for an 87% reduction in SO2 emissions and a 70% reduction in Nox emissions from...

  19. Oil Shale Mining Claims Conversion Act. Hearing before the Subcommittee on Mineral Resources Development and Production of the Committee on Energy and Natural Resources, United States Senate, One Hundredth Congress, Second Session on S. 2089, H. R. 1039, April 22, 1988

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    The hearing was called to examine two bills which address the processing of oil shale mining claims and patents by the Department of the Interior under the General Mining Law of 1872. S.2089 would provide for certain requirements relating to the conversion of oil shale mining claims located under the Mining Law of 1872 to leases and H.R.1039 would amend section 37 of the Mineral Lands Leasing Act of 1920 relating to oil shale claims. Under the new bills the owners of oil shale mining claims must make an election within 180 days after enactment as to whether to convert their claims to leases or to maintain their claims by performing 1000 dollars of annual assessment work on the claim, filing annually an affidavit of assessment work performed, and producing oil shale in significant marketable amounts within 10 years from the date of enactment of the legislation.

  20. Clean Air Act, Section 309

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas1. FeedstockCLEAN AIR ACT § 309* §7609. Policy review (a)

  1. Williamson Act | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwideWTEDBird, Idaho:Wildwood Crest, NewKansas:Williams,Florida:ActLegal

  2. WIPP - Privacy Act of 1974

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch >Internship Program TheSiteEureka Analytics andWFRNewsWindPrivacy Act

  3. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prevQuick Guide:U.N.June 8,Past Opportunities » Recovery Act

  4. Sandia National Laboratories: Recovery Act (ARRA) Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with: ARRA * awardees * contractors * DOE * Energy * Grid Integration * Partnership * photovoltaic * Photovoltaics * PV * Recovery Act * reliability * Renewable Energy * SAND...

  5. Energy Employees' Occupational Illness Compensation Program Act...

    Energy Savers [EERE]

    Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy Employees' Occupational Illness Compensation Program Energy Employees' Occupational...

  6. Land Tenure (to the End of the Ptolemaic Period)

    E-Print Network [OSTI]

    Katary, Sally

    2012-01-01T23:59:59.000Z

    for highly successful land reclamation in the Fayum,successful large-scale land reclamation (Kehoe 2010: 316).

  7. EA-1880: Notice of Intent to Prepare an Environmental Assessment...

    Office of Environmental Management (EM)

    Assessment with Scoping (EA) to meet its responsibilities under the National Environmental Policy Act (NEPA) and 7 CFR part 1794 in connection with potential impacts...

  8. Consistency of wind erosion assessments across land use and land cover types: A critical analysis

    E-Print Network [OSTI]

    Li, J; Okin, GS; Tatarko, J; Webb, NP; Herrick, JE

    2014-01-01T23:59:59.000Z

    of the SWEEP model during high wind on the Columbia Plateau.J.D. , 1998a. A single event wind erosion model. Trans. ASAEZobeck, T.M. , 1998. Revised Wind Erosion Equation (RWEQ).

  9. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  10. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    SciTech Connect (OSTI)

    N /A

    1999-03-02T23:59:59.000Z

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The Federal action triggering the preparation of this EA is the need for DOE to decide whether to release the requested funding to support the construction of the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  11. RESTORING SUSTAINABLE FORESTS ON APPALACHIAN MINED LANDS FOR WOOD PRODUCTS, RENEWABLE ENERGY, CARBON SEQUESTRATION, AND OTHER ECOSYSTEM SERVICES

    SciTech Connect (OSTI)

    Jonathan Aggett

    2003-12-15T23:59:59.000Z

    The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. In this segment of work, our goal was to review methods for estimating tree survival, growth, yield and value of forests growing on surface mined land in the eastern coalfields of the USA, and to determine the extent to which carbon sequestration is influenced by these factors. Public Law 95-87, the Surface Mining Control and Reclamation Act of 1977 (SMCRA), mandates that mined land be reclaimed in a fashion that renders the land at least as productive after mining as it was before mining. In the central Appalachian region, where prime farmland and economic development opportunities for mined land are scarce, the most practical land use choices are hayland/pasture, wildlife habitat, or forest land. Since 1977, the majority of mined land has been reclaimed as hayland/pasture or wildlife habitat, which is less expensive to reclaim than forest land, since there are no tree planting costs. As a result, there are now hundreds of thousands of hectares of grasslands and scrublands in various stages of natural succession located throughout otherwise forested mountains in the U.S. A literature review was done to develop the basis for an economic feasibility study of a range of land-use conversion scenarios. Procedures were developed for both mixed hardwoods and white pine under a set of low product prices and under a set of high product prices. Economic feasibility is based on land expectation values. Further, our review shows that three types of incentive schemes might be important: (1) lump sum payment at planting (and equivalent series of annual payments); (2) revenue incentive at harvest; and (3) benefit based on carbon volume.

  12. Bureau of Land Management’s Environmental Assessment

    Broader source: Energy.gov [DOE]

    T G Power LLC Hot Sulphur Springs Transmission Line, 120 kV Electric Power Line, Northern Independence Valley, Elko County, Nevada

  13. "The Land-Ocean Connection" Defining the Frontiers in Assessing

    E-Print Network [OSTI]

    Meyers, Steven D.

    -Biological and chemical warfare Societal Impact · 6.5 Million malaria-related deaths caused for lack library of pathogens · Low unit manufacturing cost · Microbial ID · Particulates · Proteins · Pigments #12

  14. USDA - NRCS Land Evaluation and Site Assessment: Guidebook | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri Global Energy LLC Place: Dallas,UGIURDB Ell-Saline WindInformation

  15. Property:NumberOfResourceAssessmentsLand | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal PwerPerkins County,NumberOfNonCorporateOrganizations Jump to:

  16. Assessment of Biomass Resources from Marginal Lands in APEC Countries |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in Carbon Capture andsoftwareAsian AgeEnergyResource:

  17. Stewardship of public school land by the General Land Office

    E-Print Network [OSTI]

    Zechiel, Tod Peter

    1987-01-01T23:59:59.000Z

    (a V. Nrelnh Nnl da (L Nr(PN Huis I. Veil Ill(en S. Hncnf th hraa( 4 hn Ihpr. i ha Ner(n J. (Irasr ~ Veiler N. Irene Caryn @riot( S. ladler laali ~ N. Seal Nalrnvl lie J. R Ie Saa Nrrcn J Mf((ay Satan 1. Srpp ~ (luhorttlls liar ll ~ 9(5/bh... AND CHARACTERISTICS OF THE RANGELAND The Area Under Stewardshi p Climate of the Trans-Pecos Vegetational Associations of the Trans-Pecos Uses of the Range Resources OPERATIONS OF THE ALPINE FIELD OFFICE Responsibi 1ities Assisting the Land Management Division...

  18. EA-1831: Phase II ICCS Initiative Funding Award for Calera Corporation, Moss Landing, California

    Broader source: Energy.gov [DOE]

    This EA will evaluate the environmental impacts of a proposal to provide American Recovery and Reinvestment Act funds for a project that would receive flue gas from the gas-fired Moss Landing, CA power plant and capture CO2 for permanent storage in a cementitious substitute material and process useless byproducts into useable chemicals. NOTE: This EA has been cancelled. NEPA coverage for this project is now a CX as of 9/17/2012.

  19. EIS-0406: Designation of Energy Corridors on Federal Land in 39 States

    Broader source: Energy.gov [DOE]

    DOE has canceled this EIS, which was to evaluate the environmental impacts of the designation, under Section 368(b) of the Energy Policy Act of 2005, of energy corridors on federal lands in 39 nonwestern states. The corridors, which were to be jointly identified by the Secretaries of Agriculture, Commerce, Defense, Energy, and the Interior, might have been used for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities.

  20. Explicitly Accounting for Protected Lands within the GCAM 3.0

    SciTech Connect (OSTI)

    Dooley, James J.; Zhou, Yuyu

    2012-05-01T23:59:59.000Z

    The Global Change Assessment Model Version 3.0 defines three different levels of “Protected Lands” within the agricultural and landuse component. These three different scenarios effectively cordon off 3.5% (5.0 million km2) of the Earth’s terrestrial lands in the de minimus Protected Land Scenario, 5.0% (7.20 million km2) in the Core Protected Land Scenario, and 8.2% (11.8 million km2) in the Expanded Protected Land Scenario. None of these scenarios represents the “right” level of Protected Lands for the planet today or tomorrow. Rather, the goal is to create a range of scenarios that can be used in modeling human responses to climate change and the impact those would have on managed and unmanaged terrestrial lands. These scenarios harness the wealth of information in the United Nations Environment Programme World Conservation Monitoring Centre’s World Database on Protected Areas and its categories of explicit degrees of protection.

  1. Clean Air Act General Conformity Requirements and the National...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Air Act General Conformity Requirements and the National Environmental Policy Act Process Clean Air Act General Conformity Requirements and the National Environmental Policy...

  2. Electricity Transmission, Pipelines, and National Trails. An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    SciTech Connect (OSTI)

    Kuiper, James A; Krummel, John R; Hlava, Kevin J; Moore, H Robert; Orr, Andrew B; Schlueter, Scott O; Sullivan, Robert G; Zvolanek, Emily A

    2014-03-25T23:59:59.000Z

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no locations that intersect national trails. Source data did not indicate any planned transmission lines or pipelines in Hawaii. A map atlas provides more detailed mapping of the topics investigated in this study, and the accompanying GIS database provides the baseline information for further investigating locations of interest. In many cases the locations of proposed transmission lines are not accurately mapped (or a specific route may not yet be determined), and accordingly the specific crossing locations are speculative. However since both national trails and electrical transmission lines are long linear systems, the characteristics of the crossings reported in this study are expected to be similar to both observed characteristics of the existing infrastructure provided in this report, and of the new infrastructure if these proposed projects are built. More focused study of these siting challenges is expected to mitigate some of potential impacts by choosing routes that minimize or eliminate them. The current study primarily addresses a set of screening-level characterizations that provide insights into how the National Trail System may influence the siting of energy transport facilities in the states identified under Section 368(b) of the Energy Policy Act of 2005. As such, it initializes gathering and beginning analysis of the primary environmental and energy data, and maps the contextual relationships between an important national environmental asset and how this asset intersects with energy planning activities. Thus the current study sets the stage for more in-depth analyses and data development activities that begin to solve key transmission siting constraints. Our recommendations for future work incorporate two major areas: (1) database development and analytics and (2) modeling and scenario analysis for energy planning. These recommendations provide a path forward to address key issues originally developed under the Energy Policy Act of 2005 that are now being carried forward under the President’s Climate Action Plan.

  3. REVIEWING PERFORMANCE ASSESSMENTS SUPPORTING

    E-Print Network [OSTI]

    Robert J. Lewis

    2010-01-01T23:59:59.000Z

    Purpose: To summarize current NRC policy and guidance, which should assist in making informed decisions regarding land disposal of unique low-level radioactive waste streams, including disposal of significant quantities of depleted uranium until a new regulation is implemented. Background: In September 2009, NRC staff conducted two public workshops soliciting early public input on major issues associated with a potential rulemaking for land disposal of unique waste streams including, but not limited to, significant quantities of depleted uranium. During these workshops, a number of stakeholders expressed interest or concern with the review of performance assessments supporting land disposal of unique waste streams prior to completion of the rulemaking process. Discussion: The enclosure contains a summary of existing guidance for reviewing performance assessments with a focus on issues associated with the safe disposal of unique waste streams. NRC staff is providing this guidance to the Agreement States for their information, and for distribution to their licensees, as appropriate. If you have any questions regarding this correspondence, please contact me at 301-415-3340 or the individuals named below.

  4. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1998). The BLM lands in southern Nevada are managed under the Las Vegas RMP and Final Environmental Impact Statement (BLM 1998). This RMP provides management objectives and...

  5. CARBON SEQUESTRATION ON SURFACE MINE LANDS

    SciTech Connect (OSTI)

    Donald H. Graves; Christopher Barton; Richard Sweigard; Richard Warner

    2003-10-30T23:59:59.000Z

    The 2002-2003 Department of Energy plantings amounted to 164 acres containing 111,520 tree seedlings in eastern and western Kentucky. Data gathered on these trees included an inventory to determine survival of all planted species. A sub-sample of seedlings was selected to assess the height and diameter of individual species of seedlings established. Additional efforts involved collection of soil sample and litter samples, analysis of herbaceous ground cover from vegetation clip plots and leaf area on each tree species, and development of tissue collections. All areas were sampled for penetration resistance, penetration depth (or depth to refusal), and bulk density at various depths. Rain fall events and flow rates were recorded. The water quality of runoff samples involved the determination of total and settleable solids and particle size distribution. A study was initiated that will focus on the colonization of small mammals from forest edges to various areas located on reclaimed surface mines. This effort will provide a better understanding of the role small mammals and birds have in the establishment of plant communities on mine lands that will be useful in developing and improving reclamation techniques.

  6. Guides for Freedom of Information Act and Privacy Act 1974

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental AssessmentsGeoffrey(SC)GraphiteCollaborationDeploymentGuides Guides

  7. National Environmental Policy Act (NEPA) Compliance Guide, Sandia National Laboratories

    SciTech Connect (OSTI)

    Hansen, R.P. [Hansen Environmental Consultants, Englewood, CO (United States)

    1995-08-01T23:59:59.000Z

    This report contains a comprehensive National Environmental Policy Act (NEPA) Compliance Guide for the Sandia National Laboratories. It is based on the Council on Environmental Quality (CEQ) NEPA regulations in 40 CFR Parts 1500 through 1508; the US Department of Energy (DOE) N-EPA implementing procedures in 10 CFR Part 102 1; DOE Order 5440.1E; the DOE ``Secretarial Policy Statement on the National Environmental Policy Act`` of June 1994- Sandia NEPA compliance procedures-, and other CEQ and DOE guidance. The Guide includes step-by-step procedures for preparation of Environmental Checklists/Action Descriptions Memoranda (ECL/ADMs), Environmental Assessments (EAs), and Environmental Impact Statements (EISs). It also includes sections on ``Dealing With NEPA Documentation Problems`` and ``Special N-EPA Compliance Issues.``

  8. Renewable Energy Development on Tribal Lands

    SciTech Connect (OSTI)

    Not Available

    2006-10-01T23:59:59.000Z

    Brochure describes the Tribal Energy Program, which provides American Indian tribes with financial and technical assistance for developing renewable energy projects on tribal land.

  9. Albeni Falls land acquisitions.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho The Bonneville Power Administration is working with the Idaho Department of Fish and Game to acquire and manage two parcels of land in northern Idaho to preserve,...

  10. Global Biofuels Modeling and Land Use

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biofuels Modeling and Land Use DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Strategic Analysis & Cross-cutting Sustainability March 25 2015 Gbadebo Oladosu...

  11. Landholders, Residential Land Conversion, and Market Signals

    E-Print Network [OSTI]

    Margulis, Harry L.

    2006-01-01T23:59:59.000Z

    465– Margulis: Landholders, Residential Land Conversion, and1983. An Analysis of Residential Developer Location FactorsHow Regulation Affects New Residential Development. New

  12. Sustainable Land Management in Northern Namibia

    E-Print Network [OSTI]

    and low water holding capacity (Bolivia) #12;Perspective Similar soil (Kavango) #12;Increased Demand for Food + Energy Production Expansion onto Less Resilient Lands Reduced Production per Unit Area

  13. Geothermal Development and the Use of Categorical Exclusions Under the National Environmental Policy Act of 1969 (Presentation)

    SciTech Connect (OSTI)

    Levine, A.; Young, K. R.

    2014-09-01T23:59:59.000Z

    The federal environmental review process under the National Environmental Policy Act of 1969 (NEPA) can be complex and time consuming. Currently, a geothermal developer may have to complete the NEPA process multiple times during the development of a geothermal project. One mechanism to reduce the timeframe of the federal environmental review process for activities that do not have a significant environmental impact is the use of Categorical Exclusions (CXs), which can exempt projects from having to complete an Environmental Assessment or Environmental Impact Statement. This study focuses primarily on the CX process and its applicability to geothermal exploration. In this paper, we: Provide generalized background information on CXs, including previous NEPA reports addressing CXs, the process for developing CXs, and the role of extraordinary circumstances; Examine the history of the Bureau of Land Management's (BLM) geothermal CXs; Compare current CXs for oil, gas, and geothermal energy; Describe bills proposing new statutory CXs; Examine the possibility of standardizing geothermal CXs across federal agencies; and Present analysis from the Geothermal NEPA Database and other sources on the potential for new geothermal exploration CXs. As part of this study, we reviewed Environmental Assessments (EAs) conducted in response to 20 geothermal exploration drilling permit applications (Geothermal Drilling Permits or Notices of Intents) since the year 2001, the majority of which are from the last 5 years. All 20 EAs reviewed for this study resulted in a Finding of No Significant Impact (FONSI). While many of these FONS's involved proponent proposed or federal agency required mitigation, this still suggests it may be appropriate to create or expand an exploration drilling CX for geothermal, which would have a significant impact on reducing geothermal exploration timelines and up-front costs. Ultimately, federal agencies tasked with permitting and completing environmental reviews for geothermal exploration drilling activities and/or legislative representatives are the responsible parties to discuss the merits and implementation of new or revised CXs for geothermal development.

  14. Title: Canada Land Inventory: Land Capability for Waterfowl Wildlife Data Creator /

    E-Print Network [OSTI]

    Title: Canada Land Inventory: Land Capability for Waterfowl Wildlife Data Creator / Copyright Owner: National Archives of Canada, Visual and Sound Archives Division Publisher: National Archives of Canada, Visual and Sound Archives Division; developed under the auspices of Environment Canada; distributed

  15. Modeling the effect of land cover land use change on estuarine environmental flows 

    E-Print Network [OSTI]

    Sahoo, Debabrata

    2009-05-15T23:59:59.000Z

    Environmental flows are important to maintain the ecological integrity of the estuary. In a watershed, it is influenced by land use land cover (LULC) change, climate variability, and water regulations. San Antonio, Texas, ...

  16. Energy Policy Act regulation implementation: Transportation technologies

    SciTech Connect (OSTI)

    Katz, K. [Dept. of Energy, Washington, DC (United States). Office of Alternative Fuels

    1995-12-31T23:59:59.000Z

    The paper consists of slides used during the presentation. The paper gives an overview of the Energy Policy Act of 1992, the Energy Policy Act fleet requirements, organizations which must comply, the alternative fuel provider mandate, electric utility option, mandates for state fleets, private and local fleet requirements, state and local incentives program, the alternative fuel vehicle credit program, enforcement, compliance and credit activity databases, and EPACT versus Clean Air Act Amendments.

  17. Fast acting inlet guide vanes

    SciTech Connect (OSTI)

    Minne, M.; Kull, R.

    1998-07-01T23:59:59.000Z

    A fast acting inlet guide vane (IGV) system was developed for the model Siemens V94.2 gas turbine (GT). This system enables the GT to perform larger and faster load changes in the case of electrical grid disturbances. Disturbances in electrical grids are caused by an unbalance between actual power generation and power consumption resulting in grid frequency deviations. In order to reduce such deviations, it is desirable for a GT (connected to the grid), to increase/reduce load as fast as required. This task is achieved by the fast responding IGV system: Basically, the occurring grid frequency deviation is monitored by the IGV system. Depending on this deviation, the compressor air mass flow is adapted to the changing fuel mass flow (which is set approximately proportional to the frequency deviation by the GT controller). The fast IGV actuator plays a main role in this dynamic response, allowing the vanes to open/close very fast. Tests performed on Poolbeg site (Ireland) proved safe and rapid load changes with a typical load ramp of 50 MW within 3 sec.

  18. Environmental Assessment (Newfoundland and Labrador, Canada)

    Broader source: Energy.gov [DOE]

    The Environmental Protection Act states that the purpose of environmental assessment is to "protect the environment and quality of life of the people of the province; and facilitate the wise...

  19. Georgia Surface Mining Act of 1968 (Georgia)

    Broader source: Energy.gov [DOE]

    This law regulates all surface mining in Georgia, including the coastal zone. It includes provisions to “advance the protection of fish and wildlife and the protection and restoration of land,...

  20. Coal Mining Regulatory and Reclamation Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    These regulations aim to ensure that any coal mining or extraction will be conducted in a manner that will not significantly damage the environment or area of land affected. The Department of...

  1. Flood Plain and Floodway Management Act (Montana)

    Broader source: Energy.gov [DOE]

    The state regulates flood-prone lands and waters to prevent and alleviate flooding threats to life and health and reduce private and public economic losses. The purpose of 76-5 MCA, parts 1-4 is to...

  2. IDAHO RECOVERY ACT SNAPSHOT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SNAPSHOT Idaho has substantial natural resources, including wind, geothermal, and hydroelectric power .The American Recovery & Reinvestment Act (ARRA) is making a meaningful down...

  3. Compressed Air Energy Storage Act (Kansas)

    Broader source: Energy.gov [DOE]

    This act lays out regulations for the local authorities related to site selection, design, operation and monitoring for underground storage of compressed air.

  4. Faces of the Recovery Act: Sun Catalytix

    Broader source: Energy.gov [DOE]

    At the Massachusetts Institute of Technology, Dan Nocera talks about Sun Catalytix, the next generation of solar energy, and ARPA-E funding through the Recovery Act.

  5. Arkansas Surface Coal Mining Reclamation Act (Arkansas)

    Broader source: Energy.gov [DOE]

    The Arkansas Surface Coal Mining Reclamation Act authorizes the state to develop, adopt, issue and amend rules and regulations pertaining to surface coal mining and reclamation operations. These...

  6. American Recovery and Reinvestment Act, Financial Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - ARRAAttachment3.rtf FOIA Frequently Requested Documents: DE-EE0002884 Recovery Act - Integrated Algal Biorefinery (IABR) Financial Assistance Funding Opportunity Announcement...

  7. Renewable Energy Act (Prince Edward Island, Canada)

    Broader source: Energy.gov [DOE]

    The Renewable Energy Act outlines the renewable portfolio goals, permitting for renewable projects, regulatory authority, net metering system regulations, purchase price regulations, and renewable...

  8. Canadian Environmental Protection Act 2012 (Canada)

    Broader source: Energy.gov [DOE]

    The Canadian Environmental Protection Act of 1999 (CEPA 1999) provides the legislative framework for Environment Canada, and outlines the provisions for the prevention and management of risks posed...

  9. Montana Major Facility Siting Act (Montana)

    Broader source: Energy.gov [DOE]

    The Montana Major Facility Siting Act aims to protect the environment from unreasonable degradation caused by irresponsible siting of electric transmission, pipeline, and geothermal facilities. The...

  10. Recovery Act Progress Update: Reactor Closure Feature

    SciTech Connect (OSTI)

    Cody, Tom

    2010-01-01T23:59:59.000Z

    A Recovery Act Progress Update. Decommissioning of two nuclear reactor sites at the Department of Energy's facilities has been approved and is underway.

  11. DOE National Environmental Policy Act Implementing Procedures...

    Office of Environmental Management (EM)

    species or their habitat; and Federally-protected marine mammals and Essential Fish Habitat (Marine Mammals Protection Act; Magnuson-Stevens Fishery Conservation and...

  12. Massachusetts Endangered Species Act Regulations (Massachusetts)

    Broader source: Energy.gov [DOE]

    The regulations that accompany the Massachusetts Endangered Species Act list three categories of animals and plants in need of protection: endangered, threatened, and species of special concern....

  13. South Carolina Conservation Bank Act (South Carolina)

    Broader source: Energy.gov [DOE]

    The South Carolina Conservation Bank Act establishes a state funding source to acquire property interests for environmental preservation purposes. The Bank's activity draws heavily on the earlier...

  14. Mineral Test Hole Regulatory Act (Tennessee)

    Broader source: Energy.gov [DOE]

    The Mineral Hole Regulatory Act is applicable to any person (individual, corporation, company, association, joint venture, partnership, receiver, trustee, guardian, executor, administrator,...

  15. CALIFORNIA RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    RECOVERY ACT SNAPSHOT California has substantial natural resources, including oil, gas, solar, wind, geothermal, and hydroelectric power .The American Recovery & Reinvestment...

  16. Water Pollution Control Act (West Virginia)

    Broader source: Energy.gov [DOE]

    The Water Pollution Control Act empowers the Division of Water and Waste Management of the West Virginia Department of Environmental Protection to maintain reasonable standards of purity and...

  17. Natural Gas Transmission Pipeline Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas...

  18. Faces of the Recovery Act: 1366 Technologies

    Broader source: Energy.gov [DOE]

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production.

  19. Recovery Act Progress Update: Reactor Closure Feature

    ScienceCinema (OSTI)

    Cody, Tom

    2012-06-14T23:59:59.000Z

    A Recovery Act Progress Update. Decommissioning of two nuclear reactor sites at the Department of Energy's facilities has been approved and is underway.

  20. Integrated Solid Waste Management Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act affirms the state's support for alternative waste management practices, including waste reduction and resource recovery. Each county and municipality is required to file an integrated...

  1. ARIZONA RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Arizona has substantial natural resources, including coal, solar, and hydroelectric resources. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment...

  2. Illinois Gas Pipeline Safety Act (Illinois)

    Broader source: Energy.gov [DOE]

    Standards established under this Act may apply to the design, installation, inspection, testing, construction, extension, operation, replacement, and maintenance of pipeline facilities. Whenever...

  3. Public Power Infrastructure Protection Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This statute affirms the state's commitment to protecting electric generating facilities and describes prohibited acts and penalties. A special section applies to nuclear power generating facilities.

  4. Missouri Rural Economic Stimulus Act (Missouri)

    Broader source: Energy.gov [DOE]

    The Missouri Rural Economic Stimulus Act (MORESA) provides financial incentives for public infrastructure for the development of a renewable fuel production facility or eligible new generation...

  5. TAP Webinar: Davis-Bacon Act Compliance

    Broader source: Energy.gov [DOE]

    This webinar, held on Nov. 18, 2014, offered information for Energy Department grantees, sub-grantees, and their contractors on complying with Davis-Bacon Act requirements.

  6. Canada Oil and Gas Operations Act (Canada)

    Broader source: Energy.gov [DOE]

    The purpose of this Act is to promote safety, the protection of the environment, the conservation of oil and gas resources, joint production arrangements, and economically efficient infrastructures.

  7. American Recovery and Reinvestment Act | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    imaging as well as next-generation oxygen-plasma assisted molecular beam epitaxy Microfluidics manipulation and manufacturing. Learn more detail about Recovery Act Instruments...

  8. IOWA RECOVERY ACT SNAPSHOT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IOWA RECOVERY ACT SNAPSHOT Iowa has substantial natural resources, including wind power and is the largest ethanol producer in the United States. The American Recovery &...

  9. Georgia Underground Storage Tank Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Georgia Underground Storage Act (GUST) provides a comprehensive program to prevent, detect, and correct releases from underground storage tanks (“USTs”) of “regulated substances” other than...

  10. Water Resources Restoration and Preservation Act (Florida)

    Broader source: Energy.gov [DOE]

    This Act assigns water monitoring duties to the Department of Environmental Protection, and requires the Department to establish Total Daily Maximum Load (TDML) levels for water bodies throughout...

  11. Extremely Hazardous Substances Risk Management Act (Delaware)

    Broader source: Energy.gov [DOE]

    This act lays out provisions for local governments to implement regulations and standards for the management of extremely hazardous substances, which are defined and categorized as follows:

  12. How emissions, climate, and land use change will impact mid-century air quality over the United States: a focus on effects at national parks

    E-Print Network [OSTI]

    Val Martin, M.

    We use a global coupled chemistry–climate–land model (CESM) to assess the integrated effect of climate, emissions and land use changes on annual surface O[subscript 3] and PM[subscript 2.5] in the United States with a focus ...

  13. Programmer`s manual for CAMCON: Compliance Assessment Methodology CONtroller

    SciTech Connect (OSTI)

    Rechard, R.P. [Sandia National Labs., Albuquerque, NM (United States); Gilkey, A.P.; Rudeen, D.K.; Byle, K.A. [New Mexico Engineering Research Inst., Albuquerque, NM (United States); Iuzzolino, H.J. [Geo-Centers, Inc., Albuquerque, NM (United States)

    1993-05-01T23:59:59.000Z

    CAMCON, the Compliance Assessment Methodology CONtroller, is an analysis system that assists in assessing the compliance of the Waste Isolation Pilot Plant (WIPP) with applicable long-term regulations of the US Environmental Protection Agency, including Subpart B of the Environmental Standards for the Management and Disposal of spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes, 40 CFR 191 and 40CFR268.6, which is the portion of the Land Disposal Restrictions implementing the Resource, Conservative, and Recovery Act of 1976, as amended that states the conditions for disposal of hazardous chemical wastes. This manual provides an architectural overview of the CAMCON system. Furthermore this manual presents guidelines and presents suggestions for programmers developing the many different types of software necessary to investigate various events and physical processes of the WIPP. These guidelines include user interface requirements, minimum quality assurance requirements, coding style suggestions, and the use of numerous software libraries developed specifically for or adapted for the CAMCON system.

  14. The Fundamental Challenge in Measuring Sprawl: Which Land Should Be Considered?

    E-Print Network [OSTI]

    Baskaran, Mark

    development using the National Land Cover Data Base and decennial census data to assess the extent of sprawl "extended urban areas," based on housing density and commuting patterns, and argue that they represent in the extended urban areas of Atlanta, Baltimore, Boston, Los Angeles, and Washington. Our sensitivity analyses

  15. Biofuels and land-use A simpler approach to the problem

    E-Print Network [OSTI]

    Biofuels and land-use change A simpler approach to the problem John J. Sheehan Presented of increased biofuels demand "Consequential" Life Cycle Assessment is a new concept #12;Technical uncertainty ethano #12;Political and ethical dilemmas The ceteris paribus argument: Biofuels effects should

  16. The Potential Impact of Climate Change in the Norfolk Arable Land Management Initiative

    E-Print Network [OSTI]

    Feigon, Brooke

    to assess the effects of climate change on agriculture, parts of the sector will be adversely affectedThe Potential Impact of Climate Change in the Norfolk Arable Land Management Initiative (NALMI-Mortlock, Queens University, Belfast * Contact: d.viner@uea.ac.uk C R U This poster presents climate change

  17. Water Consumption Footprint and Land Requirements of Large-Scale Alternative

    E-Print Network [OSTI]

    on crude oil and the greenhouse gas intensity of transportation. However, the water and land resource-Tropsch MD from natural gas and coal; fermentation and advanced fermentation MD to: discover new interactions among natural and human climate system components; objectively assess

  18. Recovery Act ? An Interdisciplinary Program for Education and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Recovery Act An Interdisciplinary Program for Education and Outreach in Transportation Electrification Recovery Act An Interdisciplinary...

  19. National Environmental Policy Act (NEPA) | Department of Energy

    Energy Savers [EERE]

    Coordination and Implementation International Electricity Regulation National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) All Electricity...

  20. Aligning National Environmental Policy Act Process with Environmental...

    Energy Savers [EERE]

    Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems...

  1. Land Reform and Exclusion of Poor Jagat Basnet

    E-Print Network [OSTI]

    Richner, Heinz

    141 CHAPTER 6 Land Reform and Exclusion of Poor People Jagat Basnet 6.1 Land Questions Firstly, by land reform, it is widely understood to be a process of confiscating someone's land and award Planning Commission (NPC). Land reform is an important factor for improving the economic status

  2. ACT Basic Training 05/08/2009ACT Basic Training 05/08/2009ACT Basic Training 05/08/2009ACT Basic Training 05/08/2009 OFFICIAL ANNOUNCEMENT & REGISTRATION INFORMATION

    E-Print Network [OSTI]

    Zhou, Yaoqi

    ACT Basic Training 05/08/2009ACT Basic Training 05/08/2009ACT Basic Training 05/08/2009ACT Basic Training 05/08/2009 OFFICIAL ANNOUNCEMENT & REGISTRATION INFORMATION ACT Basic Training ­ May 8, 2009 PURPOSE: The ACT Basic Training is designed to help staff who are new to Assertive Community Treatment

  3. Fair Labor Standard Act and Service Contract Act Price Adjustment UT-B Contracts Div Page 1 of 1

    E-Print Network [OSTI]

    Pennycook, Steve

    Fair Labor Standard Act and Service Contract Act ­ Price Adjustment UT-B Contracts Div Sept 2009 Page 1 of 1 flsa-price-adj-ext-sept09.doc FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT - PRICE

  4. ReACT Methodology Proof of Concept Final Report

    SciTech Connect (OSTI)

    Bri Rolston; Sarah Freeman

    2014-03-01T23:59:59.000Z

    The Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) funded INL Researchers to evaluate a novel process for assessing and mitigating cyber security risks. The proof of concept level of the method was tested in an industry environment. This case study, plus additional case studies will support the further development of the method into a tool to assist industry in securing their critical networks. This report provides an understanding of the process developed in the Response Analysis and Characterization Tool (ReACT) project. This report concludes with lessons learned and a roadmap for final development of these tools for use by industry.

  5. Land Tenure Center 50th Anniversary Celebration

    E-Print Network [OSTI]

    Sheridan, Jennifer

    + implementation. Jon Unruh will summarize land tenure obstacles to the implementation of carbon sequestration that clarifying tenure and carbon rights will be necessary for effective REDD+ implementation. REDD stands 2011 Madison workshop on Land Tenure and Forest Carbon Management. Barney Barnes will summarize

  6. 21 Sustainable Land Management and Global Development

    E-Print Network [OSTI]

    Richner, Heinz

    427 21 Sustainable Land Management and Global Development: Factors Affecting Land Users' Efforts for Sustainable Development: Foundations, Experiences, and Perspectives 428 North-South perspectives 21 the concept of sustainable develop- ment and a clearer focus on operational implications, Hurni and colleagues

  7. Biofuels and indirect land use change

    E-Print Network [OSTI]

    Biofuels and indirect land use change The case for mitigation October 2011 #12;About this study), Malaysian Palm Oil Board, National Farmers Union, Novozymes, Northeast Biofuels Collaborative, Patagonia Bio contributed views on a confidential basis. #12;1Biofuels and indirect land use change The case for mitigation

  8. Practice Note Planning for brownfield land

    E-Print Network [OSTI]

    Practice Note Planning for brownfield land regeneration to woodland and wider green infrastructure 1FCPN022 Gail Atkinson and Kieron Doick March 2014 The regeneration of brownfield land to green of brownfield regeneration to woodland in order to inform project planning, raise awareness of lessons learnt

  9. APOLLO MANNED LUNAR LANDING SCIENTIFIC EXPERIMENT PROPOSAL

    E-Print Network [OSTI]

    Rathbun, Julie A.

    APOLLO MANNED LUNAR LANDING SCIENTIFIC EXPERIMENT PROPOSAL GEOLOGICAL FIELD INVESTIGATION IN EARLY APOLLO MANNED LUNAR LANDING MISSIONS Abstract and Techi~icalSection E. M.Shoemaker, U. S-investigator November 1965 #12;APOLLO MANNED 1,UNAR I,ANDING SCIENTIFIC EXPERIMENT PROPOSAL GEOLOGICAL FIETADINi

  10. Heilougjiang adopts measures to strengthen land management-each square millimeter of land is utterly cherished and rationally used

    SciTech Connect (OSTI)

    Tan Peiquan; Liu, Y.

    1983-07-30T23:59:59.000Z

    This article reports on how a Chinese province with a large area of land and a small population has adopted a series of measures to strengthen land management, to stop the illegal occupying of land, and to protect land resources. Investigations of land resources and of the state of land use, as well as soil surveys, have been launched in order to determine the rights of land ownership and use. Many counties and cities have experimented with dividing farm areas into districts and comprehensive land planning, established land files, trained key personnel in land management skills, and have launched scientific land research. Illegal occupation, waste and destruction of land have risen with the increase in population and construction. Per capita cultivated acreage has declined to 4.1 mu. An effort has been made to reach the people in urban and rural areas with this message: ''Cherish every square millimeter of land utterly and use it rationally''.

  11. National Construction Safety Team Act Annual Report

    E-Print Network [OSTI]

    Magee, Joseph W.

    National Construction Safety Team Act Annual Report Fiscal Year 2007 Introduction In October 2002, the President signed into law the National Construction Safety Team (NCST) Act (P.L. 107 National Construction Safety Teams for deployment after events causing the failure of a building

  12. National Construction Safety Team Act Annual Report

    E-Print Network [OSTI]

    Magee, Joseph W.

    National Construction Safety Team Act Annual Report Fiscal Year 2008 Summary This annual report to Congress for FY 2008 is required by the National Construction Safety Team Act. NIST completed its federal report. The ICC Codes are widely adopted and used as the basis for state and local construction codes

  13. Faces of the Recovery Act: Sun Catalytix

    ScienceCinema (OSTI)

    Nocera, Dave

    2013-05-29T23:59:59.000Z

    BOSTON- At the Massachusetts Institute of Technology, Dan Nocera talks about Sun Catalytix, the next generation of solar energy, and ARPA-E funding through the Recovery Act. To learn about more ARPA-E projects through the Recovery Act: http://arpa-e.energy.gov/FundedProjects.aspx

  14. Data Protection Act 1998 Guidance for

    E-Print Network [OSTI]

    Mottram, Nigel

    Data Protection Act 1998 ­ Guidance for Staff/Students v1.0 v1.0 June 2012 Elaine Forbes, registered in Scotland, number SC015263 #12;Data Protection Act 1998 ­ Guidance for Staff/Students v1.0 Page .................................................................................................... 2 2. Personal Data in the University

  15. Clean Air Act Requirements: Uranium Mill Tailings

    E-Print Network [OSTI]

    EPA'S Clean Air Act Requirements: Uranium Mill Tailings Radon Emissions Rulemaking Reid J. Rosnick requirements for operating uranium mill tailings (Subpart W) Status update on Subpart W activities Outreach/Communications #12;3 EPA Regulatory Requirements for Operating Uranium Mill Tailings (Clean Air Act) · 40 CFR 61

  16. Carbon Sequestration on Surface Mine Lands

    SciTech Connect (OSTI)

    Donald Graves; Christopher Barton; Richard Sweigard; Richard Warner; Carmen Agouridis

    2006-03-31T23:59:59.000Z

    Since the implementation of the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA) in May of 1978, many opportunities have been lost for the reforestation of surface mines in the eastern United States. Research has shown that excessive compaction of spoil material in the backfilling and grading process is the biggest impediment to the establishment of productive forests as a post-mining land use (Ashby, 1998, Burger et al., 1994, Graves et al., 2000). Stability of mine sites was a prominent concern among regulators and mine operators in the years immediately following the implementation of SMCRA. These concerns resulted in the highly compacted, flatly graded, and consequently unproductive spoils of the early post-SMCRA era. However, there is nothing in the regulations that requires mine sites to be overly compacted as long as stability is achieved. It has been cultural barriers and not regulatory barriers that have contributed to the failure of reforestation efforts under the federal law over the past 27 years. Efforts to change the perception that the federal law and regulations impede effective reforestation techniques and interfere with bond release must be implemented. Demonstration of techniques that lead to the successful reforestation of surface mines is one such method that can be used to change perceptions and protect the forest ecosystems that were indigenous to these areas prior to mining. The University of Kentucky initiated a large-scale reforestation effort to address regulatory and cultural impediments to forest reclamation in 2003. During the three years of this project 383,000 trees were planted on over 556 acres in different physiographic areas of Kentucky (Table 1, Figure 1). Species used for the project were similar to those that existed on the sites before mining was initiated (Table 2). A monitoring program was undertaken to evaluate growth and survival of the planted species as a function of spoil characteristics and reclamation practice. In addition, experiments were integrated within the reforestation effort to address specific questions pertaining to sequestration of carbon (C) on these sites.

  17. Human spatial orientation perceptions during simulated lunar landing

    E-Print Network [OSTI]

    Clark, Torin Kristofer

    2010-01-01T23:59:59.000Z

    During crewed lunar landings, astronauts are expected to guide a stable and controlled descent to a landing zone that is level and free of hazards by either making landing point (LP) redesignations or taking direct manual ...

  18. MODULE DESCRIPTION FORM CL959 Strategic Environmental Assessment in Action

    E-Print Network [OSTI]

    Mottram, Nigel

    MODULE DESCRIPTION FORM CL959 Strategic Environmental Assessment in Action Module Registrar: Dr Assessment (SEA) is a process for identifying and assessing the environmental impacts of policies, plans was implemented in the EU member countries on July 2004. In Scotland, the Environmental Assessment (Scotland) Act

  19. Green Infrastructure and Flood Resiliency-Land Use Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure and Flood Resiliency-Land Use Management as an Adaptation Strategy in the Built Environment Green Infrastructure and Flood Resiliency-Land Use Management as an...

  20. Pollution on the Federal Lands II: Water Pollution Law

    E-Print Network [OSTI]

    Glicksman, Robert L.

    1993-01-01T23:59:59.000Z

    text. FEDERAL LANDS WATER POLLUTION nonpoint sources. 19Comment, Nonpoint Source Pollution, Groundwater, and theat 622. FEDERAL LANDS WATER POLLUTION The third requirement,

  1. arid land: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and indirect land use change The case for mitigation 359 Practice Note Planning for brownfield land Renewable Energy Websites Summary: space can deliver multiple benefits to...

  2. The Genetic Privacy Act and commentary

    SciTech Connect (OSTI)

    Annas, G.J.; Glantz, L.H.; Roche, P.A.

    1995-02-28T23:59:59.000Z

    The Genetic Privacy Act is a proposal for federal legislation. The Act is based on the premise that genetic information is different from other types of personal information in ways that require special protection. Therefore, to effectively protect genetic privacy unauthorized collection and analysis of individually identifiable DNA must be prohibited. As a result, the premise of the Act is that no stranger should have or control identifiable DNA samples or genetic information about an individual unless that individual specifically authorizes the collection of DNA samples for the purpose of genetic analysis, authorized the creation of that private information, and has access to and control over the dissemination of that information.

  3. Making land fly : the institutionalization of China's land quota markets and its implications for urbanization, property rights, and intergovernmental politics

    E-Print Network [OSTI]

    Xiao, Yuan, Ph. D. Massachusetts Institute of Technology

    2014-01-01T23:59:59.000Z

    This dissertation investigates China's land quota markets, a recent land policy innovation that virtually transfers urbanization permission from the countryside to cities. To circumvent national government's quota restrictions ...

  4. Lab completes Recovery Act-funded demolition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    demolished under the Recovery Act program at Los Alamos National Laboratory is now a pile of rubble. Built in 1965, the 34,000-square foot High Temperature Chemistry Facility...

  5. Clean Air Act of Montana (Montana)

    Broader source: Energy.gov [DOE]

    The purpose of the Clean Air Act of Montana is to achieve and maintain levels of air quality to "protect human health and safety and, to the greatest degree practicable, prevent injury to plant and...

  6. Georgia Air Quality Control Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Georgia Air Quality Control Act (AQCA) is a set of environmental regulations, permitting requirements, and air quality standards that control the amount of pollutants emitted and who emits them...

  7. Coal Bed Methane Protection Act (Montana)

    Broader source: Energy.gov [DOE]

    The Coal Bed Methane Protection Act establishes a long-term coal bed methane protection account and a coal bed methane protection program for the purpose of compensating private landowners and...

  8. Ground Water Protection Act (New Mexico)

    Broader source: Energy.gov [DOE]

    The purpose of the Ground Water Protection Act is to provide substantive provisions and funding mechanisms to the extent that funds are available to enable the state to take corrective action at...

  9. Dams and Reservoirs Safety Act (South Carolina)

    Broader source: Energy.gov [DOE]

    The Dams and Reservoirs Safety Act provides for the certification and inspection of dams in South Carolina and confers regulatory authority on the Department of Health and Environmental Control....

  10. Minnesota Power Plant Siting Act (Minnesota)

    Broader source: Energy.gov [DOE]

    This Act regulates the siting of large electric power generating plants, which are defined as plants designed for or capable of operating with a capacity of 50,000 kW or more. The policy of the...

  11. Florida Electrical Power Plant Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    The Power Plant Siting Act (PPSA) is the state’s centralized process for licensing large power plants. One license—a certification— replaces local and state permits. Local governments and state...

  12. Remarks by the Acting Secretary of Energy

    Broader source: Energy.gov [DOE]

    Remarks by Acting Secretary Daniel B. Poneman concerning the importance of integrated safety management for the protection of workers, the public, and the environment and successfully implementing the Department's missions.

  13. Greenhouse Gas Emissions Reduction Act (Maryland)

    Broader source: Energy.gov [DOE]

    The Greenhouse Gas Emissions Reduction Act requires the Department of the Environment to publish and update an inventory of statewide greenhouse gas emissions for calendar year 2006 and requires...

  14. South Carolina Scenic Rivers Act (South Carolina)

    Broader source: Energy.gov [DOE]

    The goal of the Scenic Rivers Act is to protect selected rivers or river segments of the State with outstanding scenic, recreational, geologic, botanical, fish, wildlife, historic, or cultural...

  15. The Metropolitan Surface Water Management Act (Minnesota)

    Broader source: Energy.gov [DOE]

    The Metropolitan Surface Water Management Act aims to protect, preserve, and use natural, surface, and groundwater storage and retention systems; identify and plan for means to improve and protect...

  16. Dam Safety and Encroachments Act (Pennsylvania)

    Broader source: Energy.gov [DOE]

    This act sets the standards and criteria for the siting and design of dams, water obstructions and encroachments considering both existing and projected conditions. It requires operational plans to...

  17. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul; 740, 293 Highway; Baden, NC 28009

    2013-02-28T23:59:59.000Z

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  18. Water Pollution Control Act (New Jersey)

    Broader source: Energy.gov [DOE]

    This act states the rules and regulations to prevent and control pollution of waters in the state. It is unlawful for any person to discharge any pollutant unless the discharge conforms with a...

  19. Uniform Transboundary Pollution Reciprocal Access Act (Montana)

    Broader source: Energy.gov [DOE]

    This Act allows any entity in a Reciprocating Jurisdiction harmed by pollution originating in the state of Montana to bring an action or other proceeding against the source of that pollution in the...

  20. The Jobs Development Act (Rhode Island)

    Broader source: Energy.gov [DOE]

    The Jobs Development Act provides an incremental reduction in the corporate income tax rate (9%) to companies creating jobs in Rhode Island. For every ten new jobs created for companies with fewer...

  1. State Natural Gas Regulation Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act gives the Nebraska Public Service Commission authority to regulate natural gas utilities and pipelines within the state, except as provided for in the Nebraska Natural Gas Pipeline Safety...

  2. Georgia Safe Dams Act of 1978 (Georgia)

    Broader source: Energy.gov [DOE]

    The purpose of the Georgia Safe Dams Act is to provide regulation, inspection and permitting of dams to the State. The Director of the Environmental Protection Division (EPD) is responsible for...

  3. Recovery Act State Memos South Dakota

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    solar-wind generates savings for S.D. city ... 6 Clean energy tax credits and grants: 1 For total Recovery Act jobs numbers in South Dakota go to...

  4. Solid Waste Resource Recovery Financing Act (Texas)

    Broader source: Energy.gov [DOE]

    The State of Texas encourages the processing of solid waste for the purpose of extracting, converting to energy, or otherwise separating and preparing solid waste for reuse. This Act provides for...

  5. Carbon Dioxide Transportation and Sequestration Act (Illinois)

    Broader source: Energy.gov [DOE]

    This Act applies to the application process for the issuance of a certificate of authority by an owner or operator of a pipeline designed, constructed, and operated to transport and to sequester...

  6. Local Option Municipal Economic Development Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act gives local governments the option to provide direct and indirect assistance to business enterprises in their communities, whether for expansion of existing operations, the creation of new...

  7. Massachusetts Hazardous Waste Facility Siting Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    This Act establishes the means by which developers of proposed hazardous waste facilities will work with the community in which they wish to construct a facility. When the intent to construct,...

  8. Massachusetts Hazardous Waste Management Act (Massachusetts)

    Broader source: Energy.gov [DOE]

    This Act contains regulations for safe disposal of hazardous waste, and establishes that a valid license is required to collect, transport, store, treat, use, or dispose of hazardous waste. Short...

  9. Florida Electric Transmission Line Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

  10. Virginia Gas and Oil Act (Virginia)

    Broader source: Energy.gov [DOE]

    The Gas and Oil Act addresses the exploration, development, and production of oil and gas resources in the Commonwealth of Virginia. It contains provisions pertaining to wells and well spacing,...

  11. Recovery Act-Funded HVAC projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy was allocated funding from the American Recovery and Reinvestment Act to conduct research into heating, ventilation, and air conditioning (HVAC) technologies and...

  12. Solid Waste Management Services Act (Connecticut)

    Broader source: Energy.gov [DOE]

    This Act affirms the commitment of the state government to the development of systems and facilities and technology necessary to initiate large-scale processing of solid wastes and resource...

  13. Local Solid Waste Disposal Act (Illinois)

    Broader source: Energy.gov [DOE]

    It is the purpose of this Act and the policy of this State to protect the public health and welfare and the quality of the environment by providing local governments with the ability to properly...

  14. Electrical Generation Tax Reform Act (Montana)

    Broader source: Energy.gov [DOE]

    This Act reforms taxes paid by electricity generators to reduce tax rates and imposes replacement taxes in response to the 1997 restructuring of the Montana electric utility industry that allows...

  15. Safe Dams Act of 1972 (Tennessee)

    Broader source: Energy.gov [DOE]

    The Safe Dams Act of 1973 (SDA) gives the Commissioner of the Department of Environment and Conservation the power to issue certificates authorizing the construction, alteration, or operation of a...

  16. Critical Areas Act of 1973 (Minnesota)

    Broader source: Energy.gov [DOE]

    This Act applies to certain areas of the state with important historic, cultural, or esthetic values, or natural systems with functions of greater than local significance. Plans for a given...

  17. Montana Natural Areas Act of 1974 (Montana)

    Broader source: Energy.gov [DOE]

    The Montana Natural Areas Act of 1974 provides for the designation and establishment of a system of natural areas in order to preserve the natural ecosystems of these areas. Designated natural...

  18. Gaines County Solid Waste Management Act (Texas)

    Broader source: Energy.gov [DOE]

    This Act establishes the Gaines County Solid Waste Management District, a governmental body to develop and carry out a regional water quality protection program through solid waste management and...

  19. Solid Waste Planning and Recycling Act (Illinois)

    Broader source: Energy.gov [DOE]

    It is the purpose of this Act to provide incentives for decreased generation of municipal waste, to require certain counties to develop comprehensive waste management plans that place substantial...

  20. Federal Buildings Personnel Training Act of 2010

    Broader source: Energy.gov [DOE]

    On December 14, 2010, President Obama signed the Federal Buildings Personnel Training Act of 2010 into law. This legislation will have an important impact on Federal agency training programs geared...

  1. Water Use Act of 1967 (North Carolina)

    Broader source: Energy.gov [DOE]

    This act sets rules for withdrawing waters in excess of 100,000 gallons per day, for constructing, installing or operating any new well or withdrawal facilities having a capacity in excess of a...

  2. Nongame and Endangered Species Conservation Act (Nebraska)

    Broader source: Energy.gov [DOE]

    The Game and Parks Commission is responsible for implementing and promulgating regulations to protect species named in the Endangered Species Act, as well as other endangered or threatened species...

  3. Flint River Drought Protection Act (Georgia)

    Broader source: Energy.gov [DOE]

    The purpose of the Flint River Drought Protection Act is to maintain in-stream flow in times of drought by providing incentives for farmers to take acres out of irrigation. It allows Environmental...

  4. Tennessee Water Resources Information Act (Tennessee)

    Broader source: Energy.gov [DOE]

    The Tennessee Water Resources Information Act is designed to prevent the lowering of the ground water table by requiring that adequate information is obtained to document current demand for water...

  5. Recovery Act Worker Update: Mike Gunnels

    SciTech Connect (OSTI)

    Tire, Brian

    2010-01-01T23:59:59.000Z

    Mike Gunnels at the Savannah River Site tells how the Recovery Act got him out of unemployment and the benefits of training and teamwork in his new job with the Department of Energy.

  6. Recovery Act Worker Update: Mike Gunnels

    ScienceCinema (OSTI)

    Tire, Brian

    2012-06-14T23:59:59.000Z

    Mike Gunnels at the Savannah River Site tells how the Recovery Act got him out of unemployment and the benefits of training and teamwork in his new job with the Department of Energy.

  7. Recovery Act-Funded Working Fluid Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy was allocated funding from the American Recovery and Reinvestment Act to conduct research into working fluid technologies and applications. Projects funded by the...

  8. Recovery Act-Funded Water Heating Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy was allocated funding from the American Recovery and Reinvestment Act to conduct research into water heating technologies and applications. Projects funded by the...

  9. Georgia Erosion and Sedimentation Act (Georgia)

    Broader source: Energy.gov [DOE]

    The Georgia Erosion and Sedimentation Act (GESA) is designed to protect vegetated buffers. GESA establishes a minimum undisturbed, vegetated buffer of 25 feet for all streams in Georgia (measured...

  10. Recovery Act State Memos American Samoa

    Energy Savers [EERE]

    Recovery Act funds to set up eight anemometers to measure and quantify the territory's wind potential. Award(s): 9.6 million, Energy Efficiency and Conservation Block Grant...

  11. Federal Information Security Management Act: Fiscal Year 2012 Evaluation (IG-13-001, October 10, 2012)

    E-Print Network [OSTI]

    Federal Information Security Management Act: Fiscal Year 2012 Evaluation (IG-13-001, October 10 Administrator, provides the Office of Inspector General's (OIG) independent assessment of NASA's information that NASA has established a program to address the challenges in each of the areas that the Office

  12. Faces of the Recovery Act: 1366 Technologies

    SciTech Connect (OSTI)

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2010-01-01T23:59:59.000Z

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  13. Faces of the Recovery Act: 1366 Technologies

    ScienceCinema (OSTI)

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2013-05-29T23:59:59.000Z

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  14. Electromagnetic design considerations for fast acting controllers

    SciTech Connect (OSTI)

    Woodford, D.A. [Manitoba HVDC Research Centre, Winnipeg, Manitoba (Canada)] [Manitoba HVDC Research Centre, Winnipeg, Manitoba (Canada)

    1996-07-01T23:59:59.000Z

    Electromagnetic design considerations for fast acting controllers in a power system is introduced and defined. A distinction is made in relation to the more commonly understood system control design necessary for damping electromechanical oscillations using stability programs and eigenanalysis. Electromagnetic eigenanalysis tools have limited availability and are consequently rarely used. Electromagnetic transients programs (emtp) on the other hand are widely used and a procedure for undertaking electromagnetic control design of fast acting controllers in a power system using emtp is presented.

  15. Marine Habitats and Land Use (Virginia)

    Broader source: Energy.gov [DOE]

    The Virginia Marine Resources Commission has jurisdiction over submerged lands off the state's coast and in inland rivers and streams, wetlands and tidal wetlands, coastal sand dunes and beaches,...

  16. Biomass Energy and Competition for Land

    E-Print Network [OSTI]

    Reilly, John

    We describe an approach for incorporating biomass energy production and competition for land into the MIT Emissions Prediction and Policy Analysis (EPPA) model, a computable general equilibrium model of the world economy, ...

  17. LAND USE AND WATER QUALITY MANAGEMENT

    E-Print Network [OSTI]

    #12;LAND USE AND WATER QUALITY MANAGEMENT IN THE BRIDGE CREEK BASIN Prepared for: Water Quality ............................................. DESCRIPTION OF BRIDGE CREEK BASIN ........................ PHYSICAL SETTING'T. ................................ 5.1 CUMULATIVE IMPACTS ....................................... 5.1.1 Bridge Creek basin upstream

  18. Hydroelectric Resources on State Lands (Montana)

    Broader source: Energy.gov [DOE]

    This chapter authorizes the leasing of state lands for the development of hydroelectric resources. It provides regulations for the granting and duration of leases, as well as for the inspection of...

  19. Management and Use of Public Lands (Virginia)

    Broader source: Energy.gov [DOE]

    The Virginia Department of Conservation and Recreation may elect to lease its lands for the development of mineral interests (defined herein as petroleum, natural gas, coal, ore, rock and any other...

  20. Land Assemblage Tax Credit Program (Missouri)

    Broader source: Energy.gov [DOE]

    The Land Assemblage Tax Credit Programs the redevelopment of blighted areas in Missouri into productive use. Redevelopers must incur acquisition costs for at least 50 acres of 75+ acre parcels,...

  1. A framework for benchmarking land models

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    their inclu- sion in Earth system models (ESMs). State-of-land models cou- pled to Earth system models should simulateland models within Earth system models, however, can help

  2. Land and its uses - actual and potential

    SciTech Connect (OSTI)

    Last, F.T.; Bell, B.G.; Holz, M.C.B.

    1986-01-01T23:59:59.000Z

    This book discusses information on the following topics: identification of ecological factors characterizing the range of terrestrial habitats (urban, rural); land classifications; water resources; conservation and landscape; remote sensing; and case studies.

  3. Wilderness designation of Bureau of Land Management lands and impacts on the availability of energy resources

    SciTech Connect (OSTI)

    Oakes, E.H.; Voelker, A.H.

    1983-02-01T23:59:59.000Z

    In 1964 Congress mandated the establishment of the National Wilderness Preservation System - a collection of federal lands dedicated to the preservation of selected parts of our once vast wilderness. Because wilderness management precludes many traditional land uses, controversy has plagued the efforts of land-management agencies to select and recommend areas for wilderness inclusion. This study examines potential impacts on the supply of energy resources from the possible withdrawal by the Bureau of Land Management (BLM) of some part of the 24.3 million acres of public lands now under study for inclusion in the wilderness system. Except for uranium, the energy-resource potential of the total WSA-acreage is low. Wilderness designation of some WSAs is therefore not expected to cause serious impacts on the future availability of energy resources. Because the significance of land withdrawals by the BLM will depend to some extent on the availability of other federal lands for mineral activities, an up-to-date estimate of the current and future status-of-access to western federal lands for mineral activities was prepared. Overall conclusions of the report are that (1) the inclusion of some BLM land in the National Wilderness Preservation System will not interfere with the nation's required supply of energy resources, (2) there is sufficient federal land currently available in the West for mineral activities, (3) the availability of western federal land for mineral activities will increase in the future, (4) the administration should continue to support the major land-review programs, and (5) the administration should accelerate the review process for WSAs in regions that have a high energy-resource potential.

  4. MARS IN A MINUTE: How Do You Land on Mars? How do you land on Mars?

    E-Print Network [OSTI]

    to land safely! Here are some options: 1. With a small- to mid-size rover, use a cushion of airbags along

  5. agricultural land based: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preparing a Conservation Plan INTRODUCTION Conservation of land, water and other natural features. Examples of goals...

  6. Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

    SciTech Connect (OSTI)

    Flora, Mary [Savannah River Nuclear Solutions Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions Bldg. 730-4B, Aiken, SC 29808 (United States); Adams, Angelia [United States Department of Energy Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy Bldg. 730-B, Aiken, SC 29808 (United States); Pope, Robert [United States Environmental Protection Agency Region IV Atlanta, GA 30303 (United States)] [United States Environmental Protection Agency Region IV Atlanta, GA 30303 (United States)

    2013-07-01T23:59:59.000Z

    The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

  7. Americans with Disabilities Act Signed (1990) | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Americans with Disabilities Act Signed (1990) Americans with Disabilities Act Signed (1990) July 26, 2013 7:30PM EDT The Americans with Disabilities Act of 1990 (ADA) prohibits...

  8. The Jones Act : an economic and political evaluation

    E-Print Network [OSTI]

    Smith, Richard A. (Richard Allen), 1981-

    2004-01-01T23:59:59.000Z

    On June 5, 1920, the Merchant Marine Act of 1920, also known as the Jones Act, became law. The Jones Act, a cabotage law, restricts American waterborne domestic trade to vessels flagged in the United States, owned by ...

  9. Power Plant and Industrial Fuel Use Act | Department of Energy

    Office of Environmental Management (EM)

    Power Plant and Industrial Fuel Use Act Power Plant and Industrial Fuel Use Act Self Certifications Title II of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended...

  10. Toxic Substances Control Act Uranium Enrichment Federal Facility...

    Office of Environmental Management (EM)

    Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic...

  11. Supporting Statement: OE Recovery Act Financial Assistance Grants...

    Energy Savers [EERE]

    Supporting Statement: OE Recovery Act Financial Assistance Grants OMB Control Number 1910-5149 Supporting Statement: OE Recovery Act Financial Assistance Grants OMB Control Number...

  12. Missouri Recovery Act State Memo | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Act State Memo Missouri has substantial natural resources, including wind and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down...

  13. South Carolina Recovery Act State Memo | Department of Energy

    Energy Savers [EERE]

    South Carolina Recovery Act State Memo South Carolina has substantial nuclear and hydroelectric resources. The American Recovery & Reinvestment Act (ARRA) is making a meaningful...

  14. Georgia Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act State Memo Georgia has substantial natural resources, including biomass and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down...

  15. Wisconsin Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act State Memo Wisconsin has substantial natural resources, including biomass and hydroelectric power. The American Recovery & Reinvestment Act (ARRA)is making a meaningful down...

  16. Washington Recovery Act State Memo | Department of Energy

    Energy Savers [EERE]

    Recovery Act State Memo Washington State has substantial natural resources, including biomass, wind, geothermal, and hydroelectric power. The American Recovery & Reinvestment Act...

  17. Recovery Act, Office of the Biomass Program,Funding Opportunity...

    Broader source: Energy.gov (indexed) [DOE]

    Recovery Act, Office of the Biomass Program,Funding Opportunity Announcements Special Notice Recovery Act, Office of the Biomass Program,Funding Opportunity Announcements Special...

  18. Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementa...

    Energy Savers [EERE]

    G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No. 113-6 Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementation of Division F,...

  19. FOIA Frequently Requested Documents: DE-EE0002884 Recovery Act...

    Energy Savers [EERE]

    FOIA Frequently Requested Documents: DE-EE0002884 Recovery Act - Integrated Algal Biorefinery (IABR) FOIA Frequently Requested Documents: DE-EE0002884 Recovery Act - Integrated...

  20. Recovery Act Selections for Smart Grid Invesment Grant Awards...

    Broader source: Energy.gov (indexed) [DOE]

    Recovery Act Selections for Smart Grid Invesment Grant Awards- By Category Updated July 2010 Recovery Act Selections for Smart Grid Invesment Grant Awards- By Category Updated July...

  1. American Recovery & Reinvestment Act, ARRA, clean energy projects...

    Energy Savers [EERE]

    American Recovery & Reinvestment Act, ARRA, clean energy projects, energy efficiency, smart grid, alternative fuels, geothermal energy American Recovery & Reinvestment Act, ARRA,...

  2. Davis Bacon Act Applicability to Smart Grid Investment Grant...

    Broader source: Energy.gov (indexed) [DOE]

    Davis Bacon Act Applicability to Smart Grid Investment Grant (SGIG) Program Grants Davis Bacon Act Applicability to Smart Grid Investment Grant (SGIG) Program Grants Letter to...

  3. Cumulative Federal Payments to OE Recovery Act Recipients, through...

    Broader source: Energy.gov (indexed) [DOE]

    September 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through September 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through...

  4. Cumulative Federal Payments to OE Recovery Act Recipients, through...

    Broader source: Energy.gov (indexed) [DOE]

    3 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013 Graph of cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013. OE...

  5. Cumulative Federal Payments to OE Recovery Act Recipients, through...

    Broader source: Energy.gov (indexed) [DOE]

    4 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2014. OE ARRA...

  6. Energy Secretary Chu Announces $384 Million in Recovery Act Funding...

    Energy Savers [EERE]

    384 Million in Recovery Act Funding for Environmental Cleanup in New Mexico Energy Secretary Chu Announces 384 Million in Recovery Act Funding for Environmental Cleanup in New...

  7. New Mexico Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mexico Recovery Act State Memo New Mexico Recovery Act State Memo New Mexico has substantial natural resources, including oil, gas, solar, wind, geothermal, and hydroelectric...

  8. Recovery Act Workers Demolish Facility Tied to Project Pluto...

    Office of Environmental Management (EM)

    Recovery and Rein- vestment Act accomplishment helping clean up traces of past nuclear testing at the Nevada National Security Site (NNSS). Recovery Act workers safely hauled...

  9. Arizona Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act State Memo Arizona has substantial natural resources, including coal, solar, and hydroelectric resources. The American Recovery & Reinvestment Act (ARRA) is...

  10. Oklahoma Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act State Memo Oklahoma has substantial natural resources, including oil, gas, solar, wind, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is...

  11. Texas Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act State Memo Texas has substantial natural resources, including oil, gas, solar, biomass, and wind power. The American Recovery & Reinvestment Act (ARRA) is making...

  12. National Environmental Policy Act (NEPA) | Department of Energy

    Energy Savers [EERE]

    Environmental Management System National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Regulations and Links DOE NEPA Website NEPA Compliance Program...

  13. Virginia Recovery Act State Memo | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Act State Memo Virginia has substantial natural resources, including coal and natural gas. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on...

  14. Utah Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act State Memo Utah has substantial natural resources, including oil, coal, natural gas, wind, geothermal, and solar power. The American Recovery & Reinvestment Act (ARRA) is...

  15. DOE Secretarial Notice: National Environmental Policy Act (February...

    Broader source: Energy.gov (indexed) [DOE]

    Notice: National Environmental Policy Act (February 5, 1990, status: cancelled) DOE Secretarial Notice: National Environmental Policy Act (February 5, 1990, status: cancelled) This...

  16. Wyoming Recovery Act State Memo | Department of Energy

    Energy Savers [EERE]

    Wyoming Recovery Act State Memo Wyoming has substantial natural resources including coal, natural gas, oil, and wind power. The American Recovery & Reinvestment Act (ARRA) is...

  17. National Energy Policy Act Guide for State Energy Program and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Energy Policy Act Guide for State Energy Program and Energy Efficiency and Conservation Block Grant Projects National Energy Policy Act Guide for State Energy Program and...

  18. President Obama Announces Over $467 Million in Recovery Act Funding...

    Office of Environmental Management (EM)

    Over 467 Million in Recovery Act Funding for Geothermal and Solar Energy Projects President Obama Announces Over 467 Million in Recovery Act Funding for Geothermal and Solar...

  19. President Obama Announces Over $467 Million in Recovery Act Funding...

    Energy Savers [EERE]

    President Obama Announces Over 467 Million in Recovery Act Funding for Geothermal and Solar Energy Projects President Obama Announces Over 467 Million in Recovery Act Funding for...

  20. Climate Change, the Clean Air Act, and Industrial Pollution

    E-Print Network [OSTI]

    Kaswan, Alice

    2012-01-01T23:59:59.000Z

    Air Act, and Industrial Pollution Professor Alice Kaswan* I.a. Existing Air Pollution. . b. Do Climate Policieson Cli- mate Change, Pollution, and the Clean Air Act." I