Powered by Deep Web Technologies
Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Commercial Equipment Testing Enforcement Policies  

Broader source: Energy.gov [DOE]

In an exercise of its enforcement discretion, under specific conditions, DOE will not perform assessment testing, verification testing, or enforcement testing on units of certain types of commercial equipment if the manufacturer distributes in commerce an otherwise identical unit that does not have that feature.

2

The National Energy Policy Act and lamp replacement options  

SciTech Connect (OSTI)

The National Policy Act of 1992 involves the creation of energy efficiency standards for a wide range of products including fluorescent and incandescent lamps. Minimum efficacy (lumens per watt) and color rendering index (CRI) standards are mandated for the popular fluorescent lamps: four-foot medium bi-pin, two-foot U-bent, eight-foot slimline and eight-foot high output. Minimum efficacies are mandated for specific incandescent R and PAR reflector lamps. These standards will affect selected colors and designs of fluorescent lamps, the most significant being the standard lamps in the cool white and warm white colors. The incandescent reflector lamps will include the R-30, R-40, PAR-38 lamps above 40 watts, excluding the halogen types. These efficiency and color rendering standards will require end-users and specifiers to select replacement fluorescent lamps from a range of performance characteristics (lumen output, efficacy, CRI and price). The choice of replacement for the R and PAR incandescent lamps will include the halogen designs and compact fluorescent designs. In this paper, replacement options will be analyzed and discussed and the effect of these options on the performance of the lighting system will be explored in detail.

Ryerson, C.

1995-06-01T23:59:59.000Z

3

NRC Enforcement Policy Review, July 1995-July 1997  

SciTech Connect (OSTI)

On June 30, 1995, the Nuclear Regulatory Commission (NRC) issued a complete revision of its General Statement of Policy and Procedure for Enforcement Action (Enforcement Policy) (60 FR 34381). In approving the 1995 revision to the Enforcement Policy, the Commission directed the staff to perform a review of its implementation of the Policy after approximately 2 years of experience and to consider public comments. This report represents the results of that review.

Lieberman, J.; Pedersen, R.M.

1998-04-01T23:59:59.000Z

4

Furnace Standards Enforcement Policy Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Furnace Standards Enforcement Policy Statement Furnace Standards Enforcement Policy Statement Furnace Standards Enforcement Policy Statement On January 11, 2013, the Department of Justice, on behalf of DOE, and the American Public Gas Association (APGA) filed a joint motion asking the court to enter an agreement to settle APGA's challenge to DOE's June 27, 2011 Direct Final Rule. The settlement agreement would, among other things, vacate the energy conservation standards applicable to non-weatherized gas furnaces established in the DFR. In an exercise of its enforcement discretion, DOE will, during the pendency of the litigation, act in a manner consistent with the terms of the settlement agreement with regard to the enforcement of the standards. Furnace Standards Enforcement Policy Statement - April 5, 2013

5

Enforcement  

Broader source: Energy.gov [DOE]

The Department of Energy’s (DOE) Office of Enforcement promotes overall improvement in the Department's safety and security programs through management and implementation of the DOE enforcement programs for safety and classified information security that are authorized by the Atomic Energy Act. The office is independent of the DOE offices that develop and implement policy and programs. The office conducts enforcement investigations using systematic enforcement practices to thoroughly evaluate operational events and conditions that represent potentially serious violations of the Department’s nuclear safety, worker safety and health, and classified information security regulations. These investigations can result in civil penalties against DOE contractors that violate the regulations.

6

Efficient IRM enforcement of history-based access control policies  

Science Journals Connector (OSTI)

Inlined Reference Monitor (IRM) is an established enforcement mechanism for history-based access control policies. IRM enforcement injects monitoring code into the binary of an untrusted program in order to track its execution history. The injected code ... Keywords: distributed optimization protocol, history-based access control policies, inlined reference monitors, language-based security, security automata

Fei Yan; Philip W. L. Fong

2009-03-01T23:59:59.000Z

7

Regional Standards Enforcement Policy | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

approaches to enforcing regional standards for residential central air conditioners and heat pumps. DOE will not assert civil penalty authority over distributors for violation of...

8

Local Law Enforcement Implementation of National Anti-terrorism Policy  

E-Print Network [OSTI]

This study examines the role of local law enforcement officers in the implementation of national anti-terrorism policy within the context of Lipsky's (1980) theory of street-level bureaucracy. Interview and survey responses ...

Dehnke, Nathan

2011-04-15T23:59:59.000Z

9

Enforcement Policy Statement: Commercial HVAC Equipment  

Office of Environmental Management (EM)

policy statements regarding Departmental testing of commercial air conditioners and heat pumps subject to test procedures and energy conservation standards found at 10 C.F.R....

10

A Language for Automatically Enforcing Privacy Policies Jean Yang Kuat Yessenov Armando Solar-Lezama  

E-Print Network [OSTI]

A Language for Automatically Enforcing Privacy Policies Jean Yang Kuat Yessenov Armando Solar adherence to privacy policies. The programming model has two components: 1) core programs describing. The pro- gramming model has two components: a core program rep

11

Enforcement Guide Supplement 95-01: Application of Price-Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted  

Broader source: Energy.gov (indexed) [DOE]

Enforcemmt Guidance SuppLemmt Enforcemmt Guidance SuppLemmt EGS 95-01 Appendix E - DOE Enforcement Handbook Department of Energy Washington. DC 20585 November 9, 1995 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR ENFORCEMENT AND INVESTIGATION STAFF SUBJECT: ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of PriceAnderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted In accordance with Section 1.3 (Interim Enforcement Guidance) of the DOE Enforcement Handbook (1087- 95), this document responds to questions regarding the manner in which DOE's enforcement policy, as set forth in 10 CFR Part 820, Appendix A (Enforcement Policy), will be applied to identified violations of the

12

Tax Policy Litmus Tests: Enforceability, Privacy, and Efficiency Jon M. Peha1  

E-Print Network [OSTI]

Tax Policy Litmus Tests: Enforceability, Privacy, and Efficiency Jon M. Peha1 Professor of electrical engineering & public policy, Carnegie Mellon University, and Independent Consultant Testimony and public policy at Carnegie Mellon University, and an independent consultant, but today I am representing

Peha, Jon M.

13

Enforcement News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 18, 2011 July 18, 2011 Showerhead Manufacturer Agrees to Civil Penalty to Resolve Enforcement Action The Department of Energy has settled a civil penalty action it initiated against "Showerheadpower" for the manufacture and online sale of showerheads that used more water than allowed by federal law. As enacted by Congress, showerheads may not consume water in excess of 2.5 gallons per minute. The manufacturer in this matter admitted it had altered commercially available, legal showerheads to consume water in excess of this efficiency standard. The manufacturer admitted to selling at least 5,000 of these modified showerheads between June 3, 2006, and February 7, 2011. July 1, 2011 Candelabra and Intermediate Base Lamps Enforcement Policy Statement The Department issued guidance today advising manufacturers, importers and

14

Building Technologies Office: Fluorescent and Incandescent Lamps Public  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fluorescent and Fluorescent and Incandescent Lamps Public Meeting to someone by E-mail Share Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Facebook Tweet about Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Twitter Bookmark Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Google Bookmark Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Delicious Rank Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on Digg Find More places to share Building Technologies Office: Fluorescent and Incandescent Lamps Public Meeting on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement

15

GATEKEEPER: Mostly Static Enforcement of Security and Reliability Policies for JavaScript Code  

E-Print Network [OSTI]

to reject the submission of widgets that do not meet the site's security policies. To show the practicality

Livshits, Ben

16

Lamp Divisions  

Office of Legacy Management (LM)

--- --- /A;; i :' r%i;in~house ilEc;' i:Z3:~cra:ion Lamp Divisions , _.. (I +i. 0 :,,,rg. . I . . -= i?e p/q! qe)-' &se pw E.rcale?l iev, Je!sey 07m March 20, 1 gs? ::r . J. A. Jones I ti. 5. Muclear Regulatory Commission .> = ..- haterials Licensing Branch -s - ,.I, - - Division of Fuel Cycle and hateri al Safety LY. , $2 - _ . ' -' . 3 _- - Yeshington, C. C. 2@555 - :_ :--, =-- -- .-?J -.: y...., : :- 7 Dear Mr. Jones : y-- --, ? . *I 2=15 2 r; X -P The following is our final report of the decontamination efZor?s takz in our Bui Iding 7 basement and wi 11 also serve to update our report i& November 12, 1980. As stated in NRC' s report of December 22, 1983, two closeout inspect ions were conducted by your King of Prussia off i ce on November 21 and December 2,

17

Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of  

Broader source: Energy.gov (indexed) [DOE]

99-02: DOE Enforcement Activities 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements The guide discusses the following areas: (1) prospective determination of employees that are "likely to receive" 100 millirem (mrem) or greater per 10 CFR 835.402, (Individual Monitoring); (2) application of enforcement policy in taking credit for respiratory protection in prospective determinations; (3) use of contractor's policies regarding personnel internal exposure to radioactive material; (4) As Low As Reasonably Achievable (ALARA) programs; (5) clarification of enforcement with regard to internal dosimetry programs; and Final Comments. Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of

18

Enforcement handbook: Enforcement of DOE nuclear safety requirements  

SciTech Connect (OSTI)

This Handbook provides detailed guidance and procedures to implement the General Statement of DOE Enforcement Policy (Enforcement Policy or Policy). A copy of this Enforcement Policy is included for ready reference in Appendix D. The guidance provided in this Handbook is qualified, however, by the admonishment to exercise discretion in determining the proper disposition of each potential enforcement action. As discussed in subsequent chapters, the Enforcement and Investigation Staff will apply a number of factors in assessing each potential enforcement situation. Enforcement sanctions are imposed in accordance with the Enforcement Policy for the purpose of promoting public and worker health and safety in the performance of activities at DOE facilities by DOE contractors (and their subcontractors and suppliers) who are indemnified under the Price-Anderson Amendments Act. These indemnified contractors, and their suppliers and subcontractors, will be referred to in this Handbook collectively as DOE contractors. It should be remembered that the purpose of the Department`s enforcement policy is to improve nuclear safety for the workers and the public, and this goal should be the prime consideration in exercising enforcement discretion.

NONE

1995-06-01T23:59:59.000Z

19

Enforcement Documents  

Broader source: Energy.gov (indexed) [DOE]

enforcement-documents Forrestal Building 1000 enforcement-documents Forrestal Building 1000 Independence Avenue, SW Washington, DC 205851.800.dial.DOE en Enforcement Letter, WEL-2013-04 http://energy.gov/hss/downloads/enforcement-letter-wel-2013-04 enforcement-letter-wel-2013-04" class="title-link">Enforcement Letter, WEL-2013-04

20

Turning on LAMP  

ScienceCinema (OSTI)

Christoph Bostedt, a senior staff scientist at SLAC's Linac Coherent Light Source X-ray laser, provides a sneak peek of a powerful new instrument, called LAMP, that is now available for experiments that probe the atomic and molecular realm. LAMP replaces and updates the first instrument at LCLS, dubbed CAMP, which will be installed at an X-ray laser in Germany.

Bostedt, Christoph

2014-07-16T23:59:59.000Z

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Turning on LAMP  

SciTech Connect (OSTI)

Christoph Bostedt, a senior staff scientist at SLAC's Linac Coherent Light Source X-ray laser, provides a sneak peek of a powerful new instrument, called LAMP, that is now available for experiments that probe the atomic and molecular realm. LAMP replaces and updates the first instrument at LCLS, dubbed CAMP, which will be installed at an X-ray laser in Germany.

Bostedt, Christoph

2014-06-30T23:59:59.000Z

22

Fluorescent Tube Lamps  

Broader source: Energy.gov [DOE]

FEMP temporarily suspended its energy efficiency requirements for fluorescent tube lamps as it evaluates the market impact of the pending 2012 minimum efficiency standards for fluorescent lamps. The program will issue updated energy efficiency requirements when the market distribution of this product category stabilizes and when doing so has the potential to result in significant Federal energy savings.

23

Magnetic fluorescent lamp  

DOE Patents [OSTI]

The radiant emission of a mercury-argon discharge in a fluorescent lamp assembly is enhanced by providing means for establishing a magnetic field with lines of force along the path of electron flow through the bulb of the lamp assembly, to provide Zeeman splitting of the ultraviolet spectral line. Optimum results are obtained when the magnetic field strength causes a Zeeman splitting of approximately 1.7 times the thermal line width.

Berman, S.M.; Richardson R.W.

1983-12-29T23:59:59.000Z

24

Enforcement Policy Statement: Regional Standards Enforcement...  

Office of Environmental Management (EM)

which set forth amended energy conservation standards for central air conditioners and heat pumps, including regional standards in certain States. 76 FR 37408. DOE has initiated...

25

Land use change emissions from oil palm expansion in Pará, Brazil depend on proper policy enforcement on deforested lands  

Science Journals Connector (OSTI)

Brazil aims to increase palm oil production to meet the growing national and global demand for edible oil and biodiesel while preserving environmentally and culturally significant areas. As land use change (LUC) is the result of complex interactions between socio-economic and biophysical drivers operating at multiple temporal and spatial scales, the type and location of LUC depend on drivers such as neighboring land use, conversion elasticity, access to infrastructure, distance to markets, and land suitability. The purpose of this study is to develop scenarios to measure the impact of land conversion under three different enforcement scenarios (none, some, and strict enforcement). We found that converting 22.5 million hectares of land can produce approximately 29 billion gallons (110 billion liters) of biodiesel a year. Of that, 22–71% of the area can come from forest land, conservation units, wetland and indigenous areas, emitting 14–84 gCO2e MJ?1. This direct land use emission alone can be higher than the carbon intensity of diesel that it intends to displace for lowering greenhouse gas emissions. This letter focuses narrowly on GHG emissions and does not address socio-economic–ecological prospects for these degraded lands for palm oil or for other purposes. Future studies should carefully evaluate these tradeoffs.

Sahoko Yui; Sonia Yeh

2013-01-01T23:59:59.000Z

26

Enforcement Surveillance  

E-Print Network [OSTI]

Law Enforcement Surveillance inthe Network Society Serena Chan and L. Jean Camp 22 IEEE Technology to techno- logical changes. In the twentieth century, the frequency of communi- cations and interactions has

Camp, L. Jean

27

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson  

Broader source: Energy.gov (indexed) [DOE]

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted In accordance with Section 1.3 (Interim Enforcement Guidance) of the DOE Enforcement Handbook (1087- 95), this document responds to questions regarding the manner in which DOE's enforcement policy, as set forth in 10 CFR Part 820, Appendix A (Enforcement Policy), will be applied to identified violations of the provisions of 10 CFR Part 835 when the violation involves a regulatory provision for which the contractor has requested exemption. The DOE Office of Worker Protection Programs and

28

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson  

Broader source: Energy.gov (indexed) [DOE]

ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted ENFORCEMENT GUIDANCE SUPPLEMENT 95-01: Application of Price Anderson Enforcement Policy to Programmatic Elements for Which Exemption Requests Have Been Submitted In accordance with Section 1.3 (Interim Enforcement Guidance) of the DOE Enforcement Handbook (1087-95), this document responds to questions regarding the manner in which DOE's enforcement policy, as set forth in 10 CFR Part 820, Appendix A (Enforcement Policy), will be applied to identified violations of the provisions of 10 CFR Part 835 when the violation involves a regulatory provision for which the contractor has requested exemption. The DOE Office of Worker Protection Programs and

29

Energy-efficient incandescent lamp: Final report  

E-Print Network [OSTI]

of Energy Conserving Incandescent Lamps", J . Brett, R.July 1981. "Filaments for Incandescent Lamps with Radiation20-22 "Energy Saving Incandescent Lamps with Infrared

Verderber, R.

2010-01-01T23:59:59.000Z

30

Retail Replacement Lamps  

Broader source: Energy.gov [DOE]

Annual CALiPER testing of A19, G25, candelabra, night light, MR16/PAR16, PAR20, and PAR30 replacement lamps – purchased directly from store shelves – offers insights on performance trends from year to year. The report findings offer valuable insights for manufacturers and retailers alike.

31

LED MR16 Lamps  

Broader source: Energy.gov [DOE]

The following CALiPER report provides detailed analysis of LED MR16 lamp performance, covering basic performance characteristics as well as subjective evaluation of beam, shadow, and color quality. Pending reports will offer analysis on performance attributes that are not captured by LM-79 testing. These reports are intended to educate the industry on market trends, potential issues, and important areas for improvement.

32

Compliance Certification Enforcement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Compliance Certification Enforcement Compliance Certification Enforcement Compliance Certification Enforcement DOE enforces the energy and water conservation regulations established by the Office of Energy Efficiency and Renewable Energy, Appliance Standards Program to ensure that residential, commercial and industrial equipment deliver the energy and cost savings required by law. To ensure that all covered products comply with the energy and water conservation standards, the enforcement office reviews manufacturers' compliance with certification requirements. Products covered under the Energy Policy and Conservation Act of 1975, as amended, are required annually to ''certify by means of a certification report that each basic model(s) meets the applicable energy conservation standard." This program

33

Enforcement | Department of Energy  

Energy Savers [EERE]

violate the regulations. Enforcement Process Overview, the Enforcement Coordinator Handbook and enforceable regulations and directives for worker safety and health, nuclear...

34

EPA Mobile Source Enforcement Memo 1A  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 OFFICE OF ENFORCEMENT AND COMPLIANCE ASSURANCE September 4, 1997 Addendum to Mobile Source Enforcement Memorandum 1A SUBJECT: Tampering Enforcement Policy for Alternative Fuel Aftermarket Conversions A. Purpose The purpose of this document is to clarify and revise the U.S. Environmental Protection Agency's (EPA's) "tampering" enforcement policy for motor vehicles and motor vehicle engines originally designed to operate on gasoline or diesel fuel and subsequently modified to operate exclusively or in conjunction with compressed natural gas (CNG) or liquified petroleum gas (LPG or propane), hereinafter referred to as "alternative fuels". The provisions of

35

LED PAR38 Lamps  

Broader source: Energy.gov [DOE]

The following CALiPER reports provide detailed analysis of LED PAR38 lamp performance, covering basic performance characteristics as well as subjective evaluation of beam, shadow, and color quality. Pending reports will offer analysis on flicker, dimming and power quality characteristics; stress testing; and lumen and chromaticity maintenance. These reports are intended to educate the industry on market trends, potential issues, and important areas for improvement.

36

Fluorescent ballast and lamp disposal issues  

SciTech Connect (OSTI)

All around the world, governments, utility companies, and private businesses are attempting to reduce the amount of energy consumed. In the US alone, new economic strategies and programs are being created to facilitate this process. For instance, the recent enactment of the National Energy Policy Act, the Environmental Protection Agency`s (EPA) Green Lights Program, and a surge of utility involvement in Demand Side Management (DSM) Commercial/Industrial Direct Install and Rebate Programs. Many of these problems target commercial/industrial lighting system retrofits as one of the most cost effective avenues for reducing the consumption of energy. Due to this trend, hundreds of millions of lighting ballasts and lamps are being discarded. The benefits of these programs result in enormous reductions in fossil fuels (and subsequent carbon dioxide, sulfur dioxide, and nitrogen oxide emissions) required to generate the displaced electricity. Throughout the US, however, there is an increasing concern for the environmental impacts surrounding the accelerated disposal of both lighting ballasts and lamps. Regulations initially established were for a one by one, retirement (failure) process rather than promoted obsolescence and forced retirement of lamp groups or entire systems (truckloads of old technologies). Recognizing this trend and the potential negative environmental effects, federal, state, and local regulators are reevaluating the impacts and are being asked to promulgate policies to specifically address this situation.

Leishman, D.L. [Alta Resource Management Services, Inc., Springfield, MA (United States)

1996-12-01T23:59:59.000Z

37

Policies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cleanroom Policies (All policies are in .pdf format) After Hours Access Policy Booking and Login Policy Cleanroom Policy Equipment Use Policy Two-Person Rule Cleanroom Chemical...

38

Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

10, 2003 10, 2003 Mr. John Christian [ ] BNFL, Inc. East Tennessee Technology Park Portal No. 8, Building K-761 P.O. Box 5689 Oak Ridge, TN 37831 Subject: Enforcement Letter- Noncompliance Tracking System Reports and May 14-15, 2003, Price-Anderson Amendments Act Program Review Dear Mr. Christian: This letter refers to the Department of Energy's (DOE) review of the facts and circumstances related to several Price-Anderson noncompliances, which are documented in the following Noncompliance Tracking System (NTS) reports * NTS-ORO--BNFL-K33-2003-0001, "Weaknesses in BNFL's Issue Screening Process to Determine PAAA Noncompliance." This report documents that the BNFL PAAA Review Board failed to correctly identify and report the vast majority of

39

Max Tech and Beyond: Fluorescent Lamps  

E-Print Network [OSTI]

Fluorescent Lamps and Incandescent Reflector Lamps; Finalmany end- use applications. Incandescent Outdoor Stationaryof color compared with the incandescent reference source is

Scholand, Michael

2012-01-01T23:59:59.000Z

40

Safety and Security Enforcement Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Enforcement Enforcement Home Worker Safety and Health Enforcement Office of Nuclear Safety Enforcement Security Enforcement Notices of Violation Consent Orders / Settlement Agreements Compliance Orders Special Report Orders Enforcement Letters Regulatory Assistance Reviews Enforcement Program and Process Guidance and Information Non-Compliance Tracking System (NTS) Non-Compliance Reporting Thresholds Regulations and Directives Enforcement Staff Enforcement Coordinator Contact Information 2013 DOE Safety and Security Enforcement Workshop Request for Investigation or Inspection of Safety or Security Violations Archived Documents HSS Logo Safety and Security Enforcement Program Office of Enforcement and Oversight What's New: » Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Brookhaven Science Associates, LLC

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in its enforcement activities. The focus of this enforcement guidance clarifies internal dosimetry program requirements identified by the Department of Energy’s nuclear safety requirements in 10 CFR 835 (Occupational Radiation Protection Programs) and 10 CFR 830.120 (Quality Assurance Requirements). To develop the enforcement guidance, EH Enforcement convened a DOE working group which included representatives from the Field Office elements and the Office of Worker Protection Programs and Hazards Management, which is the office responsible for the content and technical clarifications of 10 CFR 835. The guide discusses the following areas: (1) prospective determination of employees that are “likely to receive” 100 millirem (mrem) or greater per 10 CFR 835.402, (Individual Monitoring); (2) application of enforcement policy in taking credit for respiratory protection in prospective determinations; (3) use of contractor’s policies regarding personnel internal exposure to radioactive material; (4) As Low As Reasonably Achievable (ALARA) programs; (5) clarification of enforcement with regard to internal dosimetry programs; and Final Comments.

42

Enforcement Guidance Supplements (EGS)  

Broader source: Energy.gov (indexed) [DOE]

Requirements (07161999) EGS 99-01: Enforcement of 10 CFR Part 830.120 (Quality Assurance Rule) for Facilities Below Hazard Category III (070199) EGS 98-02: DOE Enforcement...

43

Energy Cost Calculator for Compact Fluorescent Lamps | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

project. Modify the default values to suit your project requirements. Existing incandescent lamp wattage Watts Incandescent lamp cost dollars Incandescent lamp life 1000 hours...

44

Health Implications of New Lamp Technology Progress with Lamp Safety  

E-Print Network [OSTI]

: ­ ACGIH Threshold Limit Values, UV, lasers, etc. ­ ANSI Z136.1 for lasers with MPEs 0.1 ps -30 ks ­ ANSI RP 27.1 to ANSI RP 27.3 Lamp Safety · Internationally: ­ International Commission on Non

California at Davis, University of

45

Microsoft Word - Guidance Concerning Enforcement of EISA 2007 Standards for.docx  

Broader source: Energy.gov (indexed) [DOE]

Enforcement of EISA 2007 Standards for Enforcement of EISA 2007 Standards for Candelabra Base and Intermediate Base Lamps Issued: July 1, 2011 The Energy Independence and Security Act of 2007 (EISA 2007) imposed energy conservation standards for candelabra and intermediate base lamps, and those provisions became effective with the statute. Despite the language of the statute, DOE has been made aware that for the last several years there has been an understanding among interested stakeholders that the standards would not become effective until January 1, 2012. That understanding was solidified by DOE staff statements suggesting that energy conservation standards for candelabra and intermediate base lamps would not be enforced until then. DOE understands that manufacturers made production

46

A light diet for a giant appetite: An assessment of China's proposed fluorescent lamp standard  

SciTech Connect (OSTI)

Lighting has been one of the fastest growing electric end-uses in China over the last twenty years, with an average annual growth rate of 14%. Fluorescent lighting provides a significant portion of China's lighting need. In 1998, China produced 680 million fluorescent lamps, of which 420 million were linear fluorescent lamps of various diameters (T8 to T12). There are substantial variations both in energy efficiency and lighting performance among locally produced fluorescent lamps. Such variations present a perfect opportunity for policy intervention through efficiency standards to promote the adoption of more efficient fluorescent lamps in China. This paper analyzes China's proposed minimum efficiency standard for fluorescent lamps and presents an assessment of its likely impacts on China's lighting energy consumption and GHG emissions.

Lin, Jiang

2002-04-11T23:59:59.000Z

47

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

48

Capacitive sensing with a fluorescent lamp  

E-Print Network [OSTI]

This work presents a modified fluorescent lamp that can be used as a capacitive sensing system. The lamp sensor measures changes in the electric fields emitted from the fluorescent bulbs in order to deduce the presence and ...

Cooley, John Jacob

2007-01-01T23:59:59.000Z

49

Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Enforcement Enforcement Worker Safety & Health Documents November 27, 2013 Enforcement Letter, WEL-2013-04 Issued to National Renewable Energy Laboratory related to a drum rupture and flash event of the Thermochemical User Facility. More Nuclear Safety Documents July 22, 2013 Enforcement Letter, NEL-2013-03 Issued to Lawrence Livermore National Security, LLC related to Programmatic Deficiencies in the Software Quality Assurance Program at the Lawrence Livermore National Laboratory More Security Enforcement Documents May 4, 2012 Enforcement Letter, CH2M Oak Ridge, LLC - SEL-2012-01 Issued to URS CH2M Oak Ridge, LLC, related to a Security Incident involving the Protection and Control of Classified Information at the East Tennessee Technology Park More Leadership

50

Enforcement Guidance Supplement  

Broader source: Energy.gov (indexed) [DOE]

EGS:01-02 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 17, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 01-02: Management and Independent Assessment Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on DOE contractors.

51

Enforcement Guidance Supplement 98-01:Duration of Investigations Conducted  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement 98-01:Duration of Investigations Enforcement Guidance Supplement 98-01:Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) Enforcement Guidance Supplement 98-01:Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) The DOE Enforcement Handbook (1087-95) provides the Office of Enforcement and Investigation with the opportunity to issue interim clarifying guidance occasionally with respect to the processes to be used in this office (see Section 1.3- Interim Enforcement Guidance). In particular, it is important to assist contractors and others on the relationships between the requirements of Part 820 and the Enforcement Policy, 10 CFR 820, Appendix

52

Implementation, Certification and Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Implementation, Certification Implementation, Certification and Enforcement Implementation, Certification and Enforcement The U.S. Department of Energy (DOE) is authorized by the Energy Policy and Conservation Act of 1975 (as amended) to enforce compliance with the energy and water conservation standards established for certain consumer products and commercial and industrial equipment. To ensure the implementation of the current standards for covered appliances and equipment, DOE has published certification, compliance, and enforcement regulations for these products and equipment in the Code of Federal Regulations (CFR) at 10 CFR part 429. Please note that the previous link is to the Electronic Code of Federal Regulations (e-CFR), which is a version of the CFR updated daily. It is not an official legal edition of

53

Memorandum, Protective Force Law Enforcement Authority- May 1, 2009  

Broader source: Energy.gov [DOE]

Investigation allegations that contractor procetive force personnel at a DOE site exceeded their legistative ,regulatory, and policy-based authority by providing on-duty, armed off-site assistance to local law enforcement authorites during other than recapture/recovery operations, and by accessing the local law enforcement database for background checks during the course of on-site administrative traffic stops.

54

LED Linear Lamps and Troffer Lighting  

Broader source: Energy.gov [DOE]

The CALiPER program performed a series of investigations on linear LED lamps. Each report in the series covers the performance of up to 31 linear LED lamps, which were purchased in late 2012 or 2013. The first report focuses on bare lamp performance of LED T8 replacement lamps and subsequent reports examine performance in various troffers, as well as cost-effectiveness. There is also a concise guidance document that describes the findings of the Series 21 studies and provides practical advice to manufacturers, specifiers, and consumers (Report 21.4: Summary of Linear (T8) LED Lamp Testing , 5 pages, June 2014).

55

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Guidance Supplement 01-01: Nuclear Weapon Program Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities.This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

56

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Guidance Supplement 01-01: Nuclear Weapon Program Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

57

Exploiting Opportunities for Pollution Prevention in EPA Enforcement Agreements  

E-Print Network [OSTI]

Two relatively new EPA policies encourage the inclusion of pollution prevention in regulatory enforcement settlements. The advantages to a firm include reduction or elimination of environmental problems at the source (thus ...

Becker, Monica

1995-01-01T23:59:59.000Z

58

Policies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policies Policies The Research Library provides a large collection of print and electronic books, journals, reports, conference proceedings and many audiovisual materials....

59

FASER (Formal and Automatic Security Enforcement by Rewriting) by BPA algebra with test  

Science Journals Connector (OSTI)

A correct and a cheap enforcement of security policies on information systems is a major problem for most of our institutions. In previous works, we introduced a program rewriting approach that can automatically and formally enforce security policies on untrusted programs. The program and the security policy are specified as processes in an extended version of BPA (Basic Process Algebra). After that, the enforcement problem is turned to the resolution of a linear system. In this paper, we extend the expressiveness of the algebra by adding tests which is an important step towards enforcing security policies on more real interesting systems.

Guangye Sui; Mohamed Mejri

2013-01-01T23:59:59.000Z

60

Office of Security Enforcement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security Enforcement Office of Security Enforcement MISSION The Office of Security Enforcement implements the Department's classified information security enforcement program in...

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted  

Broader source: Energy.gov (indexed) [DOE]

Duration of Investigations Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) The DOE Enforcement Handbook (1087-95) provides the Office of Enforcement and lnvestigation with the opportunity to issue interim clarifying guidance occasionally with respect to the processes to be used in this office (see Section 1.3- Interim Enforcement Guidance). In particular, it is important to assist contractors and others on the relationships between the requirements of Part 820 and the Enforcement Policy, 10 CFR 820, Appendix A. Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted

62

Enforcement Documents | Department of Energy  

Energy Savers [EERE]

Documents Enforcement Documents RSS December 2, 2014 Consent Order, Battelle Energy Alliance - NCO-2014-02 Nuclear Safety Enforcement Consent Order issued to Battelle Energy...

63

Max Tech and Beyond: Fluorescent Lamps  

E-Print Network [OSTI]

varies by watts of power per foot of electrical arc in theFoot Linear Fluorescent Lamps Efficacy Life Lumens Type Base Power

Scholand, Michael

2012-01-01T23:59:59.000Z

64

Covered Product Category: Compact Fluorescent Lamps  

Broader source: Energy.gov [DOE]

FEMP provides acquisition guidance across a variety of product categories, including compact fluorescent lamps (CFLs), which are an ENERGY STAR-qualified product category.

65

Energy saving controller for fluorescent lamps.  

E-Print Network [OSTI]

??Although fluorescent lamp is a very efficient lighting device in daily life, still the high harmonic distortion and low power factor cause unnecessary energy consumption.… (more)

Cheong, Zhi Xiong

2010-01-01T23:59:59.000Z

66

LED Replacements for Linear Fluorescent Lamps Webcast  

Broader source: Energy.gov [DOE]

In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

67

Energy conservation treatment in Exxon's “the lamp  

Science Journals Connector (OSTI)

In this article, Mary Ann Ferguson-DeThorne examines The Lamp, a publication sponsored by Exxon, to determine when and to what extent Exxon informed The Lamp's audience about an impending energy shortage and possible energy conservation methods, to learn if The Lamp's energy conservation messages reflected Exxon's stated conservation positions, and to compare The Lamp to mass-circulation news magazines in terms of how well it alerted its audience to the impending energy shortage. The crucial period of study here is 1971–1973; prior to the Arab oil boycott and the 1974 Congressional investigation of charges that the large oil companies had contrived shortages to eliminate competition.

Mary Ann Ferguson-DeThorne

1978-01-01T23:59:59.000Z

68

General Service LED Lamps | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE SSL technology fact sheet that compares general service LED light bulbs with incandescent and CFL bulbs. ledgeneral-service-lamps.pdf More Documents & Publications LED...

69

Policies  

E-Print Network [OSTI]

Optimization Online Policy. Mission statement. Optimization Online is a repository of eprints about optimization and related topics. It facilitates quick ...

70

A SPICE Compatible Model of High Intensity Discharge Lamps  

E-Print Network [OSTI]

from the arc's * Corresponding author behavior of HID lamps. This model are derived from the arc-linear resistance of the lamp, is the global specific conductance of the plasma, V is the volume of the plasma, L is the length of plasma and S is the cross section. ~ Vin G1 Lamp Model Ballast v(lamp) i(lamp) Analytical

71

General service incandescent lamp with improved efficiency  

SciTech Connect (OSTI)

A high efficiency general service incandescent lamp is disclosed. The disclosed improved general service incandescent lamp has an outer and an inner envelope. The inner envelope has a relatively small housing containing a halogen gas and a relatively high pressure efficient fill-gas and in which a low voltage filament is spatially disposed therein.

Berlec, I.

1985-06-18T23:59:59.000Z

72

Portable lamp with dynamically controlled lighting distribution  

DOE Patents [OSTI]

A double lamp table or floor lamp lighting system has a pair of compact fluorescent lamps (CFLs) arranged vertically with a reflective septum in between. By selectively turning on one or both of the CFLs, down lighting, up lighting, or both up and down lighting is produced. The control system can also vary the light intensity from each CFL. The reflective septum insures that almost all the light produced by each lamp will be directed into the desired light distribution pattern which is selected and easily changed by the user. Planar compact fluorescent lamps, e.g. circular CFLs, particularly oriented horizontally, are preferable. CFLs provide energy efficiency. The lighting system may be designed for the home, hospitality, office or other environments.

Siminovitch, Michael J. (Pinole, CA); Page, Erik R. (Berkeley, CA)

2001-01-01T23:59:59.000Z

73

LED T8 Replacement Lamps | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

T8 Replacement Lamps LED T8 Replacement Lamps This documents provides an overview of LED T8 replacement lamps and helps define a reasonable minimum performance level for the...

74

Solid-state lamp with integral occupancy sensor  

E-Print Network [OSTI]

Previous work demonstrated a retrofit proximity detector for fluorescent lamps using the lamp's own stray electric fields. This paper extends the retrofit sensor system to a solid-state (LED) lamp. The design and implementation ...

Cooley, John J.

75

COST EFFECTIVENESS OF LONG LIFE INCANDESCENT LAMPS AND ENERGY BUTTONS  

E-Print Network [OSTI]

as any 1ong-li incandescent lamp or system evaluated in thisEFFECTIVENESS OF LONG LIFE INCANDESCENT LAMPS AND ENERGYEFFECTIVENESS OF LONG LIFE INCANDESCENT LAMPS AND ENERGY

Verderber, Rudy

2013-01-01T23:59:59.000Z

76

DuraLamp USA: Order (2010-CE-0912)  

Broader source: Energy.gov [DOE]

DOE ordered DuraLamp USA, Inc. to pay a $2,500 civil penalty after finding DuraLamp USA had failed to certify that model PAR 30, an incandescent reflector lamp, complies with the applicable energy conservation standards.

77

E-Print Network 3.0 - apha policy statements Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Combination in Privacy Policy Languages Stanford University Summary: . A policy auditor may wish to con- clude that the entire policy actually enforces this statement,...

78

Tungsten wire for incandescent lamps  

SciTech Connect (OSTI)

Tungsten wire for incandescent lamp filaments must operate at high temperatures and for long times. To meet these requirements, the grain morphology of the wire must be controlled to reduce the propensity for grain boundary sliding. The morphology is a function of the distribution of very small pockets of potassium in the wire and the mechanical processing from ingot to wire. The behavior of the filament is directly related to the grain morphology. This paper describes the mechanism by which the potassium is incorporated into and distributed in the ingot. The elongation and spheroidization of the bubbles during hot rolling and swaging is also examined and related to the grain morphology of wire. Some indications of the relationship between grain morphology and filament behavior are also given.

Walter, J.L.; Briant, C.L. (General Electric Corporate Research and Development, Schenectady, NY (USA))

1990-09-01T23:59:59.000Z

79

Power factor and harmonic distortion characteristics of energy efficient lamps  

SciTech Connect (OSTI)

This paper evaluates the performance of a new class of lamps which are generally classified as the energy-saving lamps. It is shown that, when compared with the incandescent lamps, these lamps indeed consume less real power and have higher relative illumination. However, the energy-saving lamps operate at a low power factor and produce current distortion which are much higher than the distortion produced by the traditional incandescent lamps.

Etezadi-Amoli, M.; Florence, T.

1989-07-01T23:59:59.000Z

80

Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of  

Broader source: Energy.gov (indexed) [DOE]

99-02: DOE Enforcement Activities 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in its enforcement activities. The focus of this enforcement guidance clarifies internal dosimetry program requirements identified by the Department of Energy's nuclear safety requirements in 10 CFR 835 (Occupational Radiation Protection Programs) and 10 CFR 830.120

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Enforcement News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 21, 2010 April 21, 2010 DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued) The Office of General Counsel has issued Notices of Proposed Civil Penalty to Westinghouse Lighting Corporation and Mitsubishi Electric & Electronics USA, Inc. for failing to certify that certain of their products meet the applicable energy conservation standards as required by the Energy Policy Conservation Act (EPCA) and DOE regulations. The Notice issued to Westinghouse proposes payments to the government of $350,400 for failure to certify over 71 types of light bulbs. April 16, 2010 DOE Closes Investigation into Alleged Lighting Efficiency Violations The U.S. Department of Energy has closed its investigation into the energy

82

Enforcement News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 28, 2010 January 28, 2010 DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, Ltd. for failing to certify to the Department of Energy that showerheads manufactured or distributed by these companies meet the applicable water conservation standard as required by the Energy Policy Conservation Act and DOE's regulations. January 26, 2010 DOE Withdraws the Energy Star Label from 34 Compact Fluorescent Light Bulbs Washington, DC - On January 25th, the General Counsel notified 25 manufacturers that the Department of Energy has withdrawn their right to

83

Memorandum, Protective Force Law Enforcement Authority - May 1, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Protective Force Law Enforcement Authority - May 1, Protective Force Law Enforcement Authority - May 1, 2009 Memorandum, Protective Force Law Enforcement Authority - May 1, 2009 May 1, 2009 Investigation allegations that contractor procetive force personnel at a DOE site exceeded their legistative ,regulatory, and policy-based authority by providing on-duty, armed off-site assistance to local law enforcement authorites during other than recapture/recovery operations, and by accessing the local law enforcement database for background checks during the course of on-site administrative traffic stops. It has come to our attention that the Department of Energy's (DOE) Office of Imspector General (OIG) has investigated allegations that conctractor protective force (PF) personnel at a DOE site exceeded their legistative

84

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA  

Broader source: Energy.gov (indexed) [DOE]

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Jump to main content. National Environmental Policy Act (NEPA) Recent Additions | Contact Us Search: All EPA Compliance and Enforcement q You are here: EPA Home q Compliance and Enforcement q National Environmental Policy Act (NEPA) q Submitting Environmental Impact Statements Submitting Environmental Impact Statements q Amended EIS Filing System Guidelines (January 2011) q Where to Submit (or "File") an EIS q Filing an EIS--Draft, Final and Supplemental q EIS Filing Procedure for Continuity of Operations Plan (COOP) Events q Notice in the Federal Register q Time Periods Amended EIS Filing System Guidelines (January 2011)

85

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Enforcement » Enforcement Letters Services » Enforcement » Enforcement Letters Enforcement Letters Documents Available for Download November 27, 2013 Enforcement Letter, WEL-2013-04 Issued to National Renewable Energy Laboratory related to a drum rupture and flash event of the Thermochemical User Facility. July 30, 2013 Enforcement Letter, WEL-2013-02 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee July 22, 2013 Enforcement Letter, NEL-2013-03 Issued to Lawrence Livermore National Security, LLC related to Programmatic Deficiencies in the Software Quality Assurance Program at the Lawrence Livermore National Laboratory May 29, 2013 Enforcement Letter, WEL-2013-01

86

Cost effectiveness of long life incandescent lamps and energy buttons  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen hours are determined for each lamp system. It is found that the most important component lighting cost is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial unit cost of $20.00, is the most cost-effective source of illumination compared to the incandescent lamp and lamp systems examined.

Verderber, R.; Morse, O.

1980-04-07T23:59:59.000Z

87

Lamp system for uniform semiconductor wafer heating  

DOE Patents [OSTI]

A lamp system with a very soft high-intensity output is provided over a large area by water cooling a long-arc lamp inside a diffuse reflector of polytetrafluorethylene (PTFE) and titanium dioxide (TiO.sub.2) white pigment. The water is kept clean and pure by a one micron particulate filter and an activated charcoal/ultraviolet irradiation system that circulates and de-ionizes and biologically sterilizes the coolant water at all times, even when the long-arc lamp is off.

Zapata, Luis E. (Livermore, CA); Hackel, Lloyd (Livermore, CA)

2001-01-01T23:59:59.000Z

88

Compact fluorescent lamp applications in luxury hotels  

SciTech Connect (OSTI)

Over the past several years, consumers, lighting designers, and energy conservationists have paid increasing attention to the special characteristics of compact fluorescent lamps (CFLs). CFLs can typically be used to replace incandescent lamps of three to four times their own wattage, and their color rendering indices (CRIs)-80 to 85-make them virtually indistinguishable from incandescents. The typical 10,0000-hour life of a CFL often makes savings in labor its most desirable feature when compared to a shorter-lived incandescent lamp.

Gilleskie, R.J.

1996-01-01T23:59:59.000Z

89

Kyoto Protocol: Enforcement Prohibitions (West Virginia) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Kyoto Protocol: Enforcement Prohibitions (West Virginia) Kyoto Protocol: Enforcement Prohibitions (West Virginia) Kyoto Protocol: Enforcement Prohibitions (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Climate Policies The West Virginia division of environmental protection shall refrain from proposing or promulgating any new rule intended, in whole or in part, to reduce emissions of greenhouse gases from the residential, commercial,

90

Your Security Policy is What?? Matt Bishop  

E-Print Network [OSTI]

of California at San Diego peisert@cs.ucsd.edu Abstract Systems and infrastructure rarely enforce a site's security policy precisely. Conversely, determining the policy (or policy components) that the systems

Peisert, Sean

91

Enforcement Letter ELPNL050404  

Broader source: Energy.gov (indexed) [DOE]

5, 2004 5, 2004 Dr. Leonard K. Peters, [ ] Batelle Memorial Institute Pacific Northwest Division P.O. Box 999 902 Battelle Blvd. Richland, WA 99352 Subject: Pacific Northwest National Laboratory Enforcement Letter Dear Dr. Peters: The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-RL-- PNNL-PNNLNUCL-2003-0004. Our evaluation included review of the causal analysis, corrective actions, additional supporting information, and discussion with Department of Energy Richland Operations Office (RL) personnel. The subject NTS report described multiple deficiencies identified through a DOE-RL assessment of contamination control and survey practices associated with

92

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 13, 2010 April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter, Amer Industrial Technologies - April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site. March 26, 2010 Enforcement Letter, Intennech, Inc. - March 26, 2010 Enforcement Letter issued to Intermech, Inc. related to Installation and Inspection of Anchor Bolts and Pipe Supports at the DUF6 Conversion

93

LED lamp power management system and method  

DOE Patents [OSTI]

An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

2013-03-19T23:59:59.000Z

94

MagLab - Arc Lamp Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with 2,000 cells to create an arc across a 4-inch (100 millimeter) gap. When suitable electric generators became available in the late 1870s, the practical use of arc lamps began....

95

CALiPER Retail Lamps Study 3  

SciTech Connect (OSTI)

The CALiPER program first began investigating LED lamps sold at retail stores in 2010, purchasing 33 products from eight retailers and covering six product categories. The findings revealed a fragmented marketplace, with large disparities in performance of different products, accuracy of manufacturer claims, and offerings from different retail outlets. Although there were some good products, looking back many would not be considered viable competitors to other available options, with too little lumen output, not high enough efficacy, or poor color quality. CALiPER took another look in late 2011purchasing 38 products of five different types from nine retailers and the improvement was marked. Performance was up; retailer claims were more accurate; and the price per lumen and price per unit efficacy were down, although the price per product had not changed much. Nonetheless, there was still plenty of room for improvement, with the performance of LED lamps not yet reaching that of well-established classes of conventional lamps (e.g., 75 W incandescent A19 lamps). Since the second retail lamp study was published in early 2012, there has been substantial progress in all aspects of LED lamps available from retailers. To document this progress, CALiPER again purchased a sample of lamps from retail stores 46 products in total, focusing on A19, PAR30, and MR16 lamps but instead of a random sample, sought to select products to answer specific hypotheses about performance. These hypotheses focused on expanding ranges of LED equivalency, the accuracy of lifetime claims, efficacy and price trends, as well as changes to product designs. Among other results, key findings include: There are now very good LED options to compete with 60 W, 75 W, and 100 W incandescent A19 lamps, and 75 W halogen PAR30 lamps. MR16 lamps have shown less progress, but there are now acceptable alternatives to 35 W, 12 V halogen MR16 lamps and 50 W, 120 V halogen MR16 lamps for some applications. Other uses, such as in enclosed luminaires, may require more development. At the same price point, lamps purchased in 2013 tended to have higher output and slightly higher efficacy than in 2011 or 2010. Over 30% of the products purchased in 2013 exceeded the maximum efficacy measured in 2011 (71 lm/W), with the most efficacious product measured at 105 lm/W. There appears to be increasing consistency in color quality, with a vast majority of products having a CCT of 2700 K or 3000 K and a CRI between 80 and 85. There were also fewer poor performing products tested and more high-performing products available in 2013 than in previous years. The accuracy of equivalency and performance claims was better than in 2011, but remains a concern, with 43% of tested products failing to completely meet their equivalency claim and 20% of products failing to match the manufacturer’s performance data. Although progress has been substantial, on average LED lamps remain more expensive than other energy efficiency lighting technologies -- although some aspects can be superior. Although not universal to all product lines or all product types, the issue of insufficient lumen output from LED lamps is waning. Thus, manufacturers can focus on other issues, such as reducing cost, improving electrical/dimmer compatibility, eliminating flicker, or improving color quality. While these issues are not inherent to all products, they remain a concern for the broader market.

Royer, Michael P.; Beeson, Tracy A.

2014-02-01T23:59:59.000Z

96

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 5, 2004 May 5, 2004 Enforcement Letter, Battelle Memorial Institute - May 5, 2004 Enforcement Letter issued to Battelle Memorial Institute related to Radiological Work Practices at the Pacific Northwest National Laboratory April 19, 2004 Enforcement Letter, Westinghouse Savannah River Company - April 19, 2004 Enforcement Letter issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site April 1, 2004 Enforcement Letter, Bechtel Nevada - April 1, 2002 Enforcement Letter issued to Bechtel Nevada related to Noncompliances with Occupational Radiation Protection and Quality Assurance Requirements at the Nevada Test Site March 25, 2004 Enforcement Letter, Bechtel National Inc - March 25, 2004 Enforcement Letter issued to Bechtel National, Inc., related to Concrete

97

Enforcement Documents | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2, 1995 Enforcement Letter, Westinghouse Hanford Corporation - September 22, 1995 Issued to Westinghouse Hanford Corporation related to Operational Safety Requirements...

98

Retail Lamps Study 3.1: Dimming, Flicker, and Power Quality Characteristics of LED A Lamps.  

SciTech Connect (OSTI)

To date, all three reports in the retail lamps series have focused on basic performance parameters, such as lumen output, efficacy, and color quality. This report goes a step further, examining the photoelectric characteristics (i.e., dimming and flicker) of a subset of lamps from CALiPER Retails Lamps Study 3. Specifically, this report focuses on the dimming, power quality, and flicker characteristics of 14 LED A lamps, as controlled by four different retail-available dimmers. The results demonstrate notable variation across the various lamps, but little variation between the four dimmers. Overall, the LED lamps: ~tended to have higher relative light output compared to the incandescent and halogen benchmark at the same dimmer output signal (RMS voltage). The lamps’ dimming curves (i.e., the relationship between control signal and relative light output) ranged from linear to very similar to the square-law curve typical of an incandescent lamp. ~generally exhibited symmetrical behavior—the same dimming curve—when measured proceeding from maximum to minimum or minimum to maximum control signal. ~mostly dimmed below 10% of full light output, with some exceptions for specific lamp and dimmer combinations ~exhibited a range of flicker characteristics, with many comparing favorably to the level typical of a magnetically-ballasted fluorescent lamp through at least a majority of the dimming range. ~ always exceeded the relative (normalized) efficacy over the dimming range of the benchmark lamps, which rapidly decline in efficacy when they are dimmed. This report generally does not attempt to rank the performance of one product compared to another, but instead focuses on the collective performance of the group versus conventional incandescent or halogen lamps, the performance of which is likely to be the baseline for a majority of consumers. Undoubtedly, some LED lamps perform better—or more similar to conventional lamps—than others. Some perform desirably for one characteristic, but not others. Consumers (and specifiers) may have a hard time distinguishing better-performing lamps from one another; at this time, physical experimentation is likely the best evaluation tool.

Royer, Michael P.; Poplawski, Michael E.; Brown, Charles C.

2014-12-14T23:59:59.000Z

99

Enforcement Policy Statement: Compliance Period for Regional...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

energy conservation standards for residential furnaces, central air conditioners, and heat pumps, including regional standards for different product types in indicated States....

100

Central Air Conditioner Enforcement Policy Statement  

Broader source: Energy.gov [DOE]

DOE will not seek civil penalties for violations of the regional standards applicable to central air conditioners that occur prior to July 1, 2016, provided that the violations are related to the distribution in commerce of units manufactured prior to January 1, 2015.

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Enforcement Letter - KHLLC081204  

Broader source: Energy.gov (indexed) [DOE]

4 4 Ms. Nancy Tuor, [ ] Kaiser-Hill Company, LLC 10808 Highway 93 Unit B Golden, CO 80403-9200 Subject: Enforcement Letter for Water Treatment System Breach and Foam Fire Dear Ms. Tuor: The Office of Price-Anderson Enforcement (OE) has reviewed the details and circumstances regarding two recent site events: the Building 771 unauthorized breach of the Water Treatment System in December 2003; and the February 2004 Building 991 foam fire. Both of these events represent significant breakdowns in your safety programs. Additionally, the general failure to adequately recognize hazards and implement effective controls observed in association with the Building 991 foam fire was an underlying deficiency in the 2003 Building 371 glovebox fire, for which this office has

102

Enforcement Letter - WSRC  

Broader source: Energy.gov (indexed) [DOE]

4, 2003 4, 2003 Robert A. Pedde, [ ] Westinghouse Savannah River Company Savannah River Site Building 703-A/Room A203 Aiken, SC 29808 Subject: Enforcement Letter for Criticality Safety Violations (NTS-SR-WSRC- HCAN-2002-0001) Dear Mr. Pedde: This letter addresses Criticality Safety Violations that have occurred at the H-Canyon facility during a 15-month period from February 2002 through June 2003. The DOE Office of Price-Anderson Enforcement (OE) has reviewed these violations and is dismayed that they are both programmatic and recurring in nature. Indeed, in one case a criticality safety defense noncompliant condition existed since November 1996. Our review of these events identified multiple work process deficiencies that contributed to

103

Enforcement Letter - ELBN022603  

Broader source: Energy.gov (indexed) [DOE]

26, 2003 26, 2003 Mr. Frederick A. Tarantino [ ] Bechtel Nevada 2621 Losee Road North Las Vegas, NV 89030-4129 Subject: Enforcement Letter - Bechtel Nevada Authorization Basis Noncompliances Dear Mr. Tarantino: This letter refers to the Department of Energy's (DOE's) review of the facts and circumstances related to certain nuclear safety noncompliances during 2002 at the Nevada Test Site. These noncompliances were identified in the process of conducting a limited Price-Anderson Amendments Act (PAAA) Program Review of Bechtel Nevada during November 14-15, 2002, by DOE's Office of Price-Anderson Enforcement (OE), in coordination with DOE's National Nuclear Security Administration Nevada Site Office (NNSA/NSO). These matters are being called to your attention through this

104

Enforcement Guidance Supplements (EGS)  

Broader source: Energy.gov (indexed) [DOE]

Supplements (EGS) Supplements (EGS) EGS 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions (09/23/2005) EGS 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria (09/05/2003) EGS 03-01: Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 (07/21/2003) EGS 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation (02/21/2002) EGS 01-02: Management and Independent Assessment (12/17/2001) EGS 01-01: Nuclear Weapons Program Enforcement Issues (10/15/2001) EGS 00-04: Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C (10/26/2000) EGS 00-03: Specific Issues on Applicability of 10 CFR 830 (09/12/2000)

105

Enforcement Letter - Chicago  

Broader source: Energy.gov (indexed) [DOE]

Shirley Strum-Kenny Shirley Strum-Kenny [ ] Stony Brook University Hospital Administration Building, Room 310 Stony Brook, NY 11794-0701 Subject: Enforcement Letter (NTS-CH-BH-BNL-BNL-1998-0004) EA-1999-02 Dear Dr. Strum-Kenny: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning an event at the Radiation Therapy Facility (RTF) occurring in March 1998. In November 1998, DOE conducted an investigation to determine whether violations of DOE's nuclear safety rules associated with the event had occurred. The resulting Investigation Summary Report was transmitted to you on February 19, 1999. On March 11, 1999, you participated in an Enforcement Conference, along with Brookhaven Science Associates (BSA) management, to discuss the occurrence, its

106

Certification/enforcement analysis  

SciTech Connect (OSTI)

Industry compliance with minimum energy efficiency standards will be assured through a two-part program approach of certification and enforcement activities. The technical support document (TSD) presents the analyses upon which the proposed rule for assuring that consumer product comply with applicable energy efficiency standards is based. Much of the TSD is based upon support provided DOE by Vitro Laboratories. The OAO Corporation provided additional support in the development of the sampling plan incorporated in the proposed rule. Vitro's recommended approach to appliance certification and enforcement, developed after consideration of various program options, benefits, and impacts, establishes the C/E program framework, general criteria, and procedures for assuring a specified level of energy efficiency performance of covered consumer products. The results of the OAO analysis are given in Volume II of the TSD.

None

1980-06-01T23:59:59.000Z

107

Enforcement Letter - ELBNI032504  

Broader source: Energy.gov (indexed) [DOE]

25, 2004 25, 2004 Mr. J. P. Henschel [ ] Bechtel National Inc. 3000 George Washington Way Richland, WA 99352 Subject: Enforcement Letter for Concrete Work Issues Dear Mr. Henschel: This letter addresses eleven instances that have occurred at the Waste Treatment Plant during a 14-month period form August 2002 through October 2003 in which concrete work was not performed to established procedures and standards. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed these concrete work issues and is concerned with the work process you have in place to inspect concrete work prior to pour. In addition, OE is concerned with your failure to correct these known problems in a timely manner. It is our expectation that Bechtel

108

Revisions to Energy Efficiency Enforcement Regulations  

Broader source: Energy.gov (indexed) [DOE]

6450-01-P 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 430 and 431 Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23 Revisions to Energy Efficiency Enforcement Regulations AGENCY: Office of Energy Efficiency and Renewable Energy and Office of the General Counsel, Department of Energy. ACTION: Request for Information (RFI); request for comment. SUMMARY: The U.S. Department of Energy (DOE or the "Department") intends to expand and revise its existing energy efficiency enforcement regulations for certain consumer products and commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the "Act"). These regulations provide for manufacturer submission of compliance statements and

109

Evaluation of China's local enforcement of energy efficiency standards and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of China's local enforcement of energy efficiency standards and Evaluation of China's local enforcement of energy efficiency standards and labeling programs for appliances and equipment Title Evaluation of China's local enforcement of energy efficiency standards and labeling programs for appliances and equipment Publication Type Journal Article Year of Publication 2013 Authors Khanna, Nina Zheng, Nan Zhou, David Fridley, and Cecilia Fino-Chen Journal Energy Policy Date Published 10/2013 Keywords Appliance standards and labeling, compliance, energy efficiency, Low Emission & Efficient Buildings and Equipment Abstract Aims This paper aims to evaluate local enforcement of China's mandatory appliance and equipment energy efficiency standards and labeling programs, two increasingly important policies for meeting national energy and carbon reduction targets. The expected energy savings of efficiency standards and labels can be fully realized only with strong enforcement to ensure compliance for all products sold. This paper provides comprehensive retrospective evaluation of the methodologies, results, progress and remaining challenges in pilot enforcement projects initiated in the absence of consistent national check-testing focused on energy efficiency.

110

Energy Cost Calculator for Compact Fluorescent Lamps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Compact Fluorescent Lamps Compact Fluorescent Lamps Energy Cost Calculator for Compact Fluorescent Lamps October 8, 2013 - 2:18pm Addthis This tool calculates the payback period for your calc retrofit project. Modify the default values to suit your project requirements. Existing incandescent lamp wattage Watts Incandescent lamp cost dollars Incandescent lamp life 1000 hours calc wattage Watts calc cost dollars calc life (6000 hours for moderate use, 10000 hours for high use) 8000 hours Number of lamps in retrofit project Hours operating per week hours Average cost of electricity 0.06 $/kWh Relamper labor costs $/hr Time taken to retrofit all lamps in this project min Time taken to relamp one lamp min Type of Relamping Practiced: Group Relamping: Calculate Simple Payback Period months

111

Comparison of technologies for new energy-efficient lamps  

SciTech Connect (OSTI)

Energy-efficient light bulbs are being developed to replace the incandescent lamp where they can satisfy the design criteria and be used in sockets that have long hours of annual use. The four technologies discussed here include the compact fluorescent lamp, coated-filament lamp, electrodeless fluorescent lamp, and compact high-intensity discharge lamp. The systems demonstrate efficacy improvements of two to four times that of their incandescent counterparts. These new lamps have required considerable advances in lamp technology. They offer the potential for achieving efficacies close to 80 lumens per watt. These new lamps will reduce the energy used annually by incandescent lamps (190 BkWh) by more than 50% in the 1990s, at which times they will be commonly employed.

Verderber, R.R.; Rubinstein, F.R.

1983-06-01T23:59:59.000Z

112

Comparison of technologies for new energy-efficient lamps  

SciTech Connect (OSTI)

Energy-efficient light bulbs are being developed to replace the incandescent lamp where they can satisfy the design criteria and be used in sockets that have long hours of annual use. The four technologies discussed include the compact fluorescent lamp, coated-filament lamp, electrodeless fluorescent lamp, and compact high-intensity discharge lamp. The systems demonstrate efficacy improvements of two to four times that of their incandescent counterparts. These new lamps have required considerable advances in lamp technology. They offer the potential for achieving efficacies close to 80 lm/W. These new lamps will reduce the energy used annually by incandescent lamps (190 billion kWh) by more than 50 percent in the 1990's, at which times they will be commonly employed.

Verderber, R.R.; Rubinstein, F.M.

1984-09-01T23:59:59.000Z

113

Evaluation of Local Enforcement of Energy Efficiency Standards and Labeling  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Local Enforcement of Energy Efficiency Standards and Labeling Evaluation of Local Enforcement of Energy Efficiency Standards and Labeling Program in China Title Evaluation of Local Enforcement of Energy Efficiency Standards and Labeling Program in China Publication Type Conference Proceedings Year of Publication 2012 Authors Zheng, Nina, Nan Zhou, Cecilia Fino-Chen, and David Fridley Conference Name International Energy Program Evaluation Conference Date Published 06/2012 Conference Location Rome, Italy Keywords china, china energy, china energy group, energy analysis and environmental impacts department, energy efficiency, local enforcement, policy studies, standards & labeling programs Abstract As part of China's commitment to promoting and improving the local enforcement of appliance energyefficiency standards and labeling, the China National Institute of Standardization launched a localenforcement of efficiency standards and labeling project on August 14, 2009. For this project, Jiangsu,Shandong, Sichuan and Shanghai were selected as pilot locations. This paper provides information onthe local enforcement project's recent background, activities and results as well as comparison toprevious rounds of check-testing in 2006 and 2007. In addition, the paper also offers evaluation on theachievement and weaknesses in the local enforcement scheme and recommendations based oninternational experience.

114

DOE Office of Enforcement Resolves 20 Energy Efficiency Enforcement Cases |  

Broader source: Energy.gov (indexed) [DOE]

Resolves 20 Energy Efficiency Enforcement Resolves 20 Energy Efficiency Enforcement Cases DOE Office of Enforcement Resolves 20 Energy Efficiency Enforcement Cases June 3, 2011 - 5:04pm Addthis The Department of Energy's Office of Enforcement today announced that it has resolved the 20 enforcement cases it brought in April 2011 against companies for failing to certify that their products comply with the Department's energy and water use standards. The certification requirement generates important information that allows the Department to verify compliance with its efficiency standards and ensures that consumers have the information they need to buy energy- and cost-saving products. In 17 of the cases, the companies entered agreements that include a commitment to certify all covered products. As part of the agreements,

115

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where  

Broader source: Energy.gov (indexed) [DOE]

Present Present Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to time with respect to the processes used in its enforcement activities. Recently several questions have arisen regarding the scope of Price-Anderson enforcement when transportation issues are directly or indirectly involved in an incident. These questions can be separated into two areas, (1) transportation issues that involve on-site transportation typically not regulated by the Department of Transportation (DOT), and (2) transportation

116

Enforcement Regulations and Directives - Nuclear Safety | Department of  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Safety Nuclear Safety Enforcement Regulations and Directives - Nuclear Safety 10 C.F.R. Part 820 and Amendments 10 C.F.R. Part 820 - Procedural Rules for DOE Nuclear Activities 10 C.F.R. Part 820 - Procedural Rules for DOE Nuclear Activities; General Statement of Enforcement Policy; Final rule; amendment of enforcement policy statement and confirmation of interim rule 10 C.F.R. Part 830 10 C.F.R. Part 830 - Nuclear Safety Management; Final Rule Office of General Counsel Interpretation regarding the Application of DOE Technical Standard 1027-92 under 10 C.F.R. Part 830 Office of General Counsel Interpretation regarding Noncompliant Documented Safety Analyses and Exemption Relief (9/28/2011) Related Guidance DOE-STD-1083-2009, Processing Exemptions to Nuclear Safety Rules and

117

Enforcement News | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement News Enforcement News Enforcement News RSS September 30, 2013 DOE Reaches $1.9M Settlement The General Counsel's enforcement office settled an enforcement action against Ningbo Hicon International Industry Company, Ltd. for $1,927,097. Ningbo Hicon is a Chinese company that manufactures consumer refrigeration products for a variety of private labelers. Ningbo Hicon agreed to the settlement after manufacturing and distributing chest freezers that consumed about 30% more energy than permitted under the appliance energy conservation standards. This settlement reflects the second largest penalty since the enforcement office was created in 2010. July 12, 2013 Rule Issued to Prohibit Importation of Products that Fail To Comply with Federal Energy Conservation Standards

118

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Documents Enforcement Documents Enforcement Documents RSS November 27, 2013 Enforcement Letter, WEL-2013-04 Issued to National Renewable Energy Laboratory related to a drum rupture and flash event of the Thermochemical User Facility. August 29, 2013 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 issued to Brookhaven Science Associates, LLC, related to a Fall Injury Event that occurred in Building 701 at the Brookhaven National Laboratory WEA-2013-01 July 30, 2013 Enforcement Letter, WEL-2013-02 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee July 22, 2013 Enforcement Letter, NEL-2013-03 Issued to Lawrence Livermore National Security, LLC related to Programmatic

119

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- December 23, 2010 Issued to National Security Technologies, LLC related to a flash fire event at the Nevada National Security Site May 20, 2010 Enforcement Letter, Battelle...

120

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Laboratory, (WCO-2009-01) September 14, 2009 Enforcement Letter, Battelle Energy Alliance, LLC - September 14, 2009 Issued to Battelle Energy Alliance, LLC related to a Failed...

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Laboratory Evaluation of LED T8 Replacement Lamp Products  

SciTech Connect (OSTI)

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

122

Max Tech and Beyond: High-Intensity Discharge Lamps  

E-Print Network [OSTI]

formation of the electric discharge arc and the metals emitdefined as electric discharge lamps in which the arc tubelamp - an electric discharge lamp in which the arc tube wall

Scholand, Michael

2012-01-01T23:59:59.000Z

123

POLICY  

Broader source: Energy.gov (indexed) [DOE]

3, 2013 3, 2013 POLICY * Successful execution of this research and development (R&D) program will materially contribute to U.S. supply of oil and gas both today and beyond the 10 year R&D horizon. It is the consensus of this Committee that the resource potential impacted by this technology program is significant and of major importance to the Nation. There is a critical need for a sustainable and consistent approach to the technology challenges facing unconventional resource development. * The Committee believes the Plan and the procedures followed in its development to be professional and inclusive, with a significant infusion of industry knowledge. * These Independents are faced with unique and ever more difficult technical challenges in developing new unconventional resources, yet they often lack the

124

Enforcement Guidance Supplement (EGS) 00-04  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS: 00-04 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 October 23, 2000 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-04: Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C DOE' s Operational Procedures for Enforcement (June 1998), which supercede the DOE Enforcement Handbook (1087-95), provides the Office of Enforcement and Investigation with the opportunity to issue interim enforcement guidance from time to time with

125

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

126

Medium Base Compact Fluorescent Lamps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Templates for Reporting Test Results mediumbasecfltestreporttemplatev1.1.xlsx More Documents & Publications Fluorescent Lamp Ballasts Showerheads Beverage Vending Machines...

127

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where  

Broader source: Energy.gov (indexed) [DOE]

Present. Present. Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present. Recently several questions have arisen regarding the scope of Price-Anderson enforcement when transportation issues are directly or indirectly involved in an incident. These questions can be separated into two areas, (1) transportation issues that involve on-site transportation typically not regulated by the Department of Transportation (DOT), and (2) transportation issues that involve off-site transportation. This guidance addresses off-site transportation that is regulated by DOT and other state and federal agencies. Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present.

128

Office of Nuclear Safety Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Office of Nuclear Safety Enforcement Office of Nuclear Safety Enforcement MISSION The Office of Nuclear Safety Enforcement implements the Department's nuclear safety...

129

Faceted execution of policy-agnostic programs  

E-Print Network [OSTI]

It is important for applications to protect sensitive data. Even for simple confidentiality and integrity policies, it is often difficult for programmers to reason about how the policies should interact and how to enforce ...

Austin, Thomas H.

130

Enforcement Letter - Richland  

Broader source: Energy.gov (indexed) [DOE]

24, 2001 24, 2001 Ms. M.P. Delozier [ ] CH2M Hill Hanford Group, Inc. MSIN: H6-08 2440 Stevens Center Richland, WA 99352 Subject: Enforcement Letter Dear Ms. Delozier: This letter refers to a recent investigation by the Department of Energy (DOE), regarding potential noncompliances with the requirements of 10 CFR 830, "Nuclear Safety Management," occurring at the Hanford Tank Farms. The investigation reviewed three issues that were reported into the Noncompliance Tracking System (NTS) by CH2M Hill Hanford Group, Inc. Two of the NTS reports involve the failure to perform the Technical Safety Requirement (TSR) for [ ] gas monitoring. The initial potential noncompliance occurred in January 2000, in which a Zip Cord was installed in a catch tank without first monitoring for [ ]

131

Enforcement Letter - Chicago  

Broader source: Energy.gov (indexed) [DOE]

16, 2002 16, 2002 Dr. Peter Paul, [ ] Brookhaven Science Associates Brookhaven National Laboratory Building 460 P.O. Box 5000 Upton, NY 11973-5000 Subject: Enforcement Letter Dear Dr. Paul: This letter refers to an evaluation by the Department of Energy (DOE) of three reports of noncompliances with quality assurance and/or occupational radiation protection provisions of DOE's nuclear safety requirements occurring at Brookhaven National Laboratory (BNL). These issues, described below, were reported into the Noncompliance Tracking System (NTS) by your staff and involved procurement and/or control of radioactive sources. 1. On January 19, 2001, BNL reported that an [radioactive] neutron source in an unlabeled package had been moved from a posted High Radiation Area to radiologically controlled

132

NSTec Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

3, 2007 3, 2007 Dr. Stephen M. Younger President and General Manager National Security Technologies, LLC P.O. Box 98521 M/S NSF001 Las Vegas, Nevada 89193-8521 Dear Dr. Younger: The Department of Energy's (DOE) Office of Enforcement conducted an evaluation of the deficiencies described in Noncompliance Tracking System (NTS) Report NTS- NSO--NST-NTS-2007-0002, Unplanned Radiological Exposure during Borehole Activity. Our evaluation included reviews of the associated critique and root cause analysis reports, and the related corrective action plan. Based on our evaluation, we have concluded that violations of 10 C.F.R. 835, Occupational Radiation Protection, occurred when the National Security Technologies (NSTec) Borehole Management Project personnel were preparing to gain access to the wellhead at a post-shot crater in

133

Enforcement Letter - ELMOUND1222041  

Broader source: Energy.gov (indexed) [DOE]

4 4 Mr. John G. Lehew, [ ] CH2M Hill Mound, Inc 1 Mound Road P.O. Box 3030 Miamisburg, OH 45343-3030 Subject: Enforcement Letter-Spread of Contamination during Group 9 Waste Line Remediation Dear Mr. Lehew: My office has completed an evaluation of the facts and circumstances relating to the contamination event reported in the above subject. On Tuesday, July 27, 2004, several employees working in the soil contamina tion area (SCA) were unnecessarily contaminated with radioactive material as they traversed the SCA. The employees were assisting in the removal of a concrete encased underground radioactive material waste line. Documentation for the removal of prior sections of the waste line in potential release

134

Enforcement Letter ELWSRC041904  

Broader source: Energy.gov (indexed) [DOE]

19, 2004 19, 2004 Mr. Robert A. Pedde, [ ] Westinghouse Savannah River Company Savannah River Site Building [ ]/Room [ ] Aiken, SC 29808 Subject: Enforcement Letter Addressing Employee Reprisal (NTS-SR-WSRC-CLOSEGEN-2003-0001) Dear Mr. Pedde: On October 13, 2003, Westinghouse Savannah River Company (WSRC) reported a noncompliance into the Noncompliance Tracking System (NTS) involving an employee reprisal. The employee was terminated from WSRC after raising safety-related issues and procedural violations while positions in his area of expertise were available elsewhere at the site. The matter was investigated as an employee concern and the employee was reinstated. Our review of the Investigation Report dated October 1, 2003, indicates that the matter

135

Enforcement Letter - Richland  

Broader source: Energy.gov (indexed) [DOE]

7, 1997 7, 1997 Mr. H. J. Hatch [ ] Fluor Daniel Hanford, Inc., H5-20 P.O. Box 1000 Richland, WA 99352-1000 Subject: Noncompliance Numbers NTS-RL--PHMC-TANKFARM-1997-0001 NTS-RL--PHMC-TANKFARM-1997-0002 NTS-RL--PHMC-TANKFARM-1997-0003 Dear Mr. Hatch: This letter refers to the Department of Energy's (DOE) investigation of potential violations of the Quality Assurance Rule (QA Rule) nuclear safety requirements identified in the subject reports. Fluor Daniel Hanford, Incorporated, as Management and Integrating contractor for the DOE's Hanford site, has responsibility for assuring sub-tier contractors comply with its Quality Assurance Plan. On April 27 and 28, 1997, the Office of Enforcement and Investigation personnel met with members of your staff and representatives from Lockheed Martin Hanford Company (LMHC). Our purpose

136

Enforcement Letter - Rocky Flats  

Broader source: Energy.gov (indexed) [DOE]

1, 2000 1, 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to an evaluation by the Department of Energy (DOE) of noncompliance report number NTS-RFO--KHLL-SITEWIDE-2000-0005, which describes noncompliances with the design and procurement requirements of 10 CFR 830.120 (Quality Assurance Rule). 10 CFR 830.120(c)(2)(iii) requires that procured items and services shall meet established requirements and perform as required; 10 CFR 830.120(c)(2)(ii) requires that design work including changes, shall incorporate applicable requirements and design bases; 10 CFR 830.120(c)(2)(iv) requires that inspection and testing of specified items, services, and processes shall be conducted

137

Enforcement Letter - KHLL  

Broader source: Energy.gov (indexed) [DOE]

Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 Subject: Enforcement Letter Noncompliance Report: NTS-RFO--KHLL-771OPS-1997-0002 Dear Mr. Card: This letter refers to the Department of Energy=s (DOE) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The potential noncompliances involved inadequate implementation of work controls, specifically failure of workers to perform required surveillance of the Fire Protection System. The failure to fully perform the required surveillance was identified by Safe Sites of Colorado (SSOC) on June 2, 1997, and reported to DOE in the subject Noncompliance Tracking System report on June 26, 1997.

138

Enforcement Letter - Idaho  

Broader source: Energy.gov (indexed) [DOE]

Dr. Bernard L. Meyers Dr. Bernard L. Meyers [ ] Bechtel BWXT Idaho, LLC P.O. Box 1625, MS 3898 Idaho Falls, Idaho 83415 Subject: Enforcement Letter (NTS-ID--BBWI-TRA-1999-0001) Dear Dr. Meyers: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning issues related to the contamination of personnel while performing a hot cell exhaust system filter replacement. This incident occurred on July 21, 1999, at the Idaho National Engineering and Environmental Laboratory's (INEEL) Test Reactor Area Hot Cell Facility (TRA-632). Building TRA-632 is used by International Isotopes Idaho, Inc. (I4) for the preparation of irradiated materials for commercial distribution. During February 29 through March 2, 2000, DOE conducted an investigation to determine what, if any, noncompliances with applicable nuclear

139

Enforcement Letter - Argonne West  

Broader source: Energy.gov (indexed) [DOE]

9, 1999 9, 1999 Mr. John I. Sackett [ ] Argonne National Laboratory-West P.O. Box 2528 Idaho Falls, Idaho 83403-6000 Subject: Enforcement Letter (NTS-CH-AA-ANLW-ANLW-1998-0001) Dear Mr. Sackett: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning two incidents occurring in June and August 1998 at Argonne National Laboratory - West's (ANLW) Fuel Conditioning Facility (FCF): dropping a fuel basket assembly containing chopped fuel elements and repair of a manipulator seal tube. During November 2-3, 1998, DOE conducted an investigation to determine what, if any, noncompliances with applicable nuclear safety regulations may have been associated with these incidents. A copy of the investigation summary report is

140

Enforcement Letter - Idaho  

Broader source: Energy.gov (indexed) [DOE]

0, 1999 0, 1999 Mr. Steve Laflin [ ] International Isotopes Idaho Inc. 2325 West Broadway, Suite D Idaho Falls, ID 83402 Subject: Enforcement Letter (NTS-ID--LITC-TRA-1999-0001) Dear Mr. Laflin: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the relocation of an irradiated [isotope] pellet from within a hot cell to an adjoining, outside, charging port service area. This incident occurred on January 6, 1999, at the Idaho National Engineering and Environmental Laboratory's Test Reactor Area Hot Cell Facility (TRA-632). Building TRA-632 is utilized by International Isotopes Idaho Inc. (I4) for the preparation of irradiated materials for distribution. During March 23-24, 1999, DOE conducted an investigation to determine

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Enforcement Letter - Idaho  

Broader source: Energy.gov (indexed) [DOE]

2000 2000 Dr. Bernard L. Meyers [ ] Bechtel BWXT Idaho, LLC P.O. Box 1625, MS 3898 Idaho Falls, ID 83414 Subject: Enforcement Letter Dear Dr. Meyers: This letter refers to a recent investigation by the Department of Energy (DOE) regarding noncompliances with requirements of 10 CFR 830.120 (Quality Assurance Rule) occurring at the Idaho National Engineering and Environmental Laboratory (INEEL). The investigation reviewed five issues reported into the Noncompliance Tracking System (NTS) by Bechtel BWXT Idaho, LLC (BBWI) and two Quality Program assessment reports. Two of the NTS reports involved specific events that occurred before October 1, 1999, when BBWI began operating INEEL but was responsible for implementing corrective actions. The remaining three reports involved programmatic

142

Mercury Lamps Recycling Fluorescent light-tubes, compact fluorescent bulbs, mercury and sodium vapor lamps, ultraviolet and  

E-Print Network [OSTI]

Mercury Lamps Recycling Fluorescent light-tubes, compact fluorescent bulbs, mercury and sodium vapor lamps, ultraviolet and HID (high-intensity discharge) lamps and all other mercury containing labeled for shipment to a recycling plant for mercury, glass and aluminum recovery. The beneficial re

Baker, Chris I.

143

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 20, 2010 January 20, 2010 Enforcement Letter, Isoteck Systems, LLC - January 20, 2010 Enforcement Letter issued to Isotek Systems, LLC related to Quality Assurance Issues associated with the U233 Material Downblending and Disposition Project at Oak Ridge National Laboratory September 14, 2009 Enforcement Letter, Battelle Energy Alliance, LLC - September 14, 2009 Enforcement Letter issued to Battelle Energy Alliance, LLC related to a Failed Scram Event at the Neutron Radiography Reactor at the Idaho National Laboratory July 13, 2009 Enforecement Letter, Parsons Infrastructure & Technology Group INC, - July 13, 2009 Enforcement Letter issued to Parsons Infrastructure & Technology Group, Inc., related to a Form Wood Timber Fire at the Salt Waste Processing Facility at the Savannah River Site

144

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 30, 1999 July 30, 1999 Enforcement Letter, Lockheed-Martin Energy Systems, Inc - July 30, 1999 Issued to Lockheed Martin Energy Systems, Inc. related to Radioactive Material Uptakes at the Y-12 National Security Complex April 15, 1999 Enforcement Letter, Stony Brook University Hospital - April 15, 1999 Issued to Stony Brook University Hospital related to a Failed Interlock at the Radiation Therapy Facility at the Brookhaven National Laboratory February 9, 1999 Enforcement Letter, Argonne National Laboratory-West - February 9, 1999 Enforcement Letter issued to Argonne National Laboratory related to a Dropped Fuel Basket Assembly and Radiation Protection Program Deficiencies at Argonne National Laboratory-West August 4, 1998 Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4,

145

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 5, 2008 June 5, 2008 Preliminary Notice of Violation, CH2M HILL Hanford Group, Inc. - NEA-2008-02 Preliminary Notice of Violation issued to CH2M Hill Hanford Group, Inc., related to a Radioactive Waste Spill at the Hanford Site Tank Farms May 15, 2008 Enforcement Letter, Sandia Corporation - May 15, 2008 Enforcement Letter issued to Sandia Corporation related to the Protection of Classified Information at the Sandia National Laboratories May 15, 2008 Enforcement Letter, Lawrence Livermore National Security LLC, - May 15, 2008 Enforcement Letter issued to Lawrence Livermore National Security, LLC related to the Protection of Classified Information at the Lawrence Livermore National Laboratory May 15, 2008 Enforcement Letter, Los Alamos National Security LLC - May 15, 2008

146

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 13, 2004 October 13, 2004 Enforcement Letter issued to BWXT Y-12 - October 13, 2004 Enforcement Letter issued to BWXT Y-12 related to Safety Basis Compliance Deficiencies at the Y-12 National Security Complex October 4, 2004 Enforcement Letter, CH2M Hill - October 4, 2004 Issued to CH2M Hill related to at a Lapse in Dosimetry Accreditation at the Separations Process Research Unit August 30, 2004 Preliminary Notice of Violation, Washington TRU Solutions, LLC - EA-2004-08 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC, related to the Transportainer Procurement and Fabrication Deficiencies at the Waste Isolation Pilot Plant August 12, 2004 Enforcement Letter, Kaiser-Hill Company - August 12, 2004 Enforcement Letter issued to Kaiser-Hill Company, LLC related to a Water

147

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 Consent Order, Fluor Fernald, Inc. - EA-2003-05 Price-Anderson Enforcement Consent Order issued to Fluor Fernald, Inc., related to an Unposted High Radiation Area at the Fernald Environmental Management Project, (EA-2003-05) July 17, 2003 Enforcement Letter, BNFL Inc - July 10, 2003 Enforcement Letter issued to BNFL, Inc. related to potential violations of Quality Assurance Requirements at the East Tennessee Technology Park July 7, 2003 Enforcement Letter, LANL - July 7, 2003 Enforcement Letter issued to Los Alamos National Laboratory related to Negative Performance Trends June 4, 2003 Preliminary Notice of Violation, BWXT Y-12 - EA-2003-03 Preliminary Notice of Violation issued to BWXT Y-12, related to Welding Inspection Deficiencies at the Y-12 National Security Complex, June 4, 2003

148

Lighting Group: Sources and Ballasts: LED Reflector Lamp  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LED Reflector Lamp LED Reflector Lamp LED Reflector Lamp Objective LED reflector lamp The goal of this project is to develop a revolutionary new reflector lamp which offers many advantages over current incandescent reflector lamps, including: three times greater efficiency ten times the rated life greater optical and performance properties use of light emitting diodes (LEDs) to generate the light. Although LEDs have been commercially available since the late 1960Â’s, recent dramatic improvements in LED technology have led to white light devices with efficiencies that meet or exceed those of a standard incandescent lamp. This project will build upon these improvements to develop a new type of source for focusing light. Contact Information For more information on this project, please contact:

149

LED lamp color control system and method  

SciTech Connect (OSTI)

An LED lamp color control system and method including an LED lamp having an LED controller 58; and a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 determines whether the LED source 80 is in a feedback controllable range, stores measured optical flux for the LED source 80 when the LED source 80 is in the feedback controllable range, and bypasses storing the measured optical flux when the LED source 80 is not in the feedback controllable range.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A.M.

2013-02-05T23:59:59.000Z

150

Safety and Security Enforcement Coordinator Handbook  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SAFETY AND SECURITY SAFETY AND SECURITY ENFORCEMENT COORDINATOR HANDBOOK August 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy AUGUST 2012 DOE ENFORCEMENT COORDINATOR HANDBOOK TABLE OF CONTENTS i Table of Contents Ensure use of the proper version by checking with the Office of Enforcement and Oversight website at: www.hss.doe.gov/enforce/process_guidance.html. Acronyms and Definitions ........................................................................................... iii I. Purpose of Enforcement Coordinator Handbook ............................................ 1 II. Enforcement Coordinator Roles and Responsibilities ................................... 2 * DOE Enforcement Coordinator ......................................................................... 2

151

Building Technologies Office: Implementation, Certification and Enforcement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Implementation, Implementation, Certification and Enforcement to someone by E-mail Share Building Technologies Office: Implementation, Certification and Enforcement on Facebook Tweet about Building Technologies Office: Implementation, Certification and Enforcement on Twitter Bookmark Building Technologies Office: Implementation, Certification and Enforcement on Google Bookmark Building Technologies Office: Implementation, Certification and Enforcement on Delicious Rank Building Technologies Office: Implementation, Certification and Enforcement on Digg Find More places to share Building Technologies Office: Implementation, Certification and Enforcement on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement Standardized Templates for Reporting Test Results

152

Safety and Security Enforcement Coordinator Handbook  

Broader source: Energy.gov (indexed) [DOE]

SAFETY AND SECURITY SAFETY AND SECURITY ENFORCEMENT COORDINATOR HANDBOOK August 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy AUGUST 2012 DOE ENFORCEMENT COORDINATOR HANDBOOK TABLE OF CONTENTS i Table of Contents Ensure use of the proper version by checking with the Office of Enforcement and Oversight website at: www.hss.doe.gov/enforce/process_guidance.html. Acronyms and Definitions ........................................................................................... iii I. Purpose of Enforcement Coordinator Handbook ............................................ 1 II. Enforcement Coordinator Roles and Responsibilities ................................... 2 * DOE Enforcement Coordinator ......................................................................... 2

153

Enforcement Documents - Oak Ridge National Laboratory | Department...  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory Enforcement Documents - Oak Ridge National Laboratory January 20, 2010 Enforcement Letter, Isotek Systems, LLC - January 20, 2010 Issued to Isotek...

154

Enforcement Program and Process Guidance and Information  

Broader source: Energy.gov [DOE]

The Safety and Security Enforcement Coordinator Handbook is intended to provide DOE and contractor enforcement coordinators with information to aid their respective organizations in implementing ...

155

Security Enforcement Reporting Criteria | Department of Energy  

Energy Savers [EERE]

can be found in the Office of Health, Safety and Security's Enforcement Coordinator Handbook. Security Enforcement Reporting Criteria More Documents & Publications Safety and...

156

Enforcement Letter, Westinghouse Savannah River Company - April...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Company - July 21, 1998 Enforcement Letter, Westinghouse Savannah River Company - March 29, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000...

157

DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Institutes Enforcement Action against 4 Showerhead Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products January 28, 2010 - 1:49pm Addthis WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, Ltd. for failing to certify to the Department of Energy that showerheads manufactured or distributed by these companies meet the applicable water conservation standard as required by the Energy Policy Conservation Act and DOE's regulations. These Notices of Proposed Civil Penalty collectively propose payments to the government of over $3 million. Unless the manufacturers settle these claims within

158

DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi  

Broader source: Energy.gov (indexed) [DOE]

Initiates Enforcement Proceedings against Westinghouse and Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued) DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued) April 21, 2010 - 10:42am Addthis The Office of General Counsel has issued Notices of Proposed Civil Penalty to Westinghouse Lighting Corporation and Mitsubishi Electric & Electronics USA, Inc. for failing to certify that certain of their products meet the applicable energy conservation standards as required by the Energy Policy Conservation Act (EPCA) and DOE regulations. The Notice issued to Westinghouse proposes payments to the government of $350,400 for failure to certify over 71 types of light bulbs. The Notice issued to Mitsubishi

159

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers  

Broader source: Energy.gov (indexed) [DOE]

Initiates Enforcement Actions Against 4 Showerhead Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) March 7, 2010 - 3:41pm Addthis The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited for failing to certify to DOE that showerheads manufactured or distributed within the United States meet the applicable water conservation standards as required by the Energy Policy and Conservation Act (EPCA) and DOE regulations. This Notice of Proposed Civil Penalty proposes payments to the government of $1,920,200. Under federal law, manufacturers of some products covered by EPCA are required to

160

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 Enforcement Letter, Computer Services, LLC - WEL-2012-03 Enforcement Letter issued to On Computer Services, LLC, related to an Employee Electrical Shock that occurred in Technical Area 55 at the Los Alamos National Laboratory, October 23, 2012 Enforcement Letter, Controlled Power Company - WEL-2012-02 Enforcement Letter issued to Controlled Power Company related to an Electrical Shock Near Miss that occurred in the Radiological Laboratory Utility Office Building at the Los Alamos National Laboratory October 17, 2012 Preliminary Notice of Violation, Los Alamos National Security, LLC - WEA-2012-03 Issued to Los Alamos National Security, LLC, related to Four Electrical Safety-Related Events that occurred at the Los Alamos National Laboratory (LANL) October 4, 2012

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Enforcement News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 23, 2010 December 23, 2010 DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process Today, the Department of Energy issued enforcement guidance on the application of recently granted waivers for large-capacity clothes washers and announced steps to improve the waiver process - and refrain from certain enforcement actions - so that innovative covered products can demonstrate compliance with DOE efficiency requirements and come to market without undue delays. Based on comments received in response to DOE's December 13, 2010 Westinghouse Pays $50,000 Civil Penalty to Resolve Light Bulb Efficiency Violations The Department of Energy has successfully resolved the enforcement case against Westinghouse Lighting Corporation for failure to certify its light

162

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 1, 2004 April 1, 2004 Enforcement Letter, Bechtel Nevada - April 1, 2002 Enforcement Letter issued to Bechtel Nevada related to Noncompliances with Occupational Radiation Protection and Quality Assurance Requirements at the Nevada Test Site March 25, 2004 Enforcement Letter, Bechtel National Inc - March 25, 2004 Enforcement Letter issued to Bechtel National, Inc., related to Concrete Work Issues at the Waste Treatment and Immobilization Plant at the Hanford Site January 23, 2004 Preliminary Notice of Violation, Bechtel BWXT Idaho, LLC - EA-2004-01 Preliminary Notice of Violation issued to Bechtel BWXT Idaho, LLC, related to a Toppled Waste Stack Event at the Radioactive Waste Management Complex Subsurface Disposal Area at the Idaho National Engineering and Environmental Laboratory.

163

Savannah River Site - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Savannah River Site Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site, July 22, 2011 (NEA-2011-02) Consent Order issued to Parsons Infrastructure & Technology Group, Inc., related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies, Inc. related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010

164

Enforcement Letters | Department of Energy  

Energy Savers [EERE]

Letter, NEL-2013-01 - January 7, 2013 Issued to B&W Pantex, LLC related to the Conduct of Nuclear Explosive Operations at the Pantex Plant December 20, 2012 Enforcement...

165

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Letter, NEL-2013-01 - January 7, 2013 Issued to B&W Pantex, LLC related to the Conduct of Nuclear Explosive Operations at the Pantex Plant December 20, 2012 Enforcement...

166

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 8, 2005 Enforcement Letter, CH2M Hill Hanford Group, Inc - July 8, 2005 Issued to CH2M Hill Hanford Group, Inc., related to Neutron Exposure at the Hanford Site June 2, 2005...

167

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Corporation - EA-1999-05 Issued to Mason & Hanger Corporation, related to a Chemical Fire at the Pantex Plant, (EA-1999-05 July 30, 1999 Enforcement Letter, Lockheed-Martin...

168

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 16, 2006 November 16, 2006 Preliminary Notice of Violation, CH2M Hill Hanford Group, Inc. - EA-2006-06 Preliminary Notice of Violation issued to CH2M Hill Hanford Group, Inc., related to Radiological Contamination Events at the Hanford Site Tank Farms September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant June 15, 2006 Enforcement Letter, BWXT Y-12 - June 15, 2006 Enforcement Letter issued to BWXT Y-12 related to Quality Assurance Deficiencies in construction activities at the Y-12 National Security Complex Highly Enriched Uranium Manufacturing Facility

169

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 Enforcement Letter, WEL-2011-01 Issued to Brookhaven Science Associates, LLC, related to a Worker Injury that occurred during Tree Cutting Operations at the Brookhaven National Laboratory October 24, 2011 Enforcement Letter, NEL-2011-03 Issued to EnergySolutions, LLC related to a Radiological Contamination Event at the Separations Process Research Unit at the Knolls Atomic Power Laboratory October 21, 2011 Enforcement Letter, Safety and Ecology Corporation - NEL-2011-04 Enforcement Letter issued to Safety and Ecology Corporation related to Two Radiological Contamination Events at the Separations Process Research Unit at the Knolls Atomic Power Laboratory October 13, 2011 Consent Order, URS Energy & Construction, Inc. - NCO-2011-02 Issued to URS Energy & Construction, Inc., related to Quality Improvement

170

Conservation Standards Enforcement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Conservation Standards Enforcement Conservation Standards Enforcement Conservation Standards Enforcement The Office of the General Counsel is working to ensure that manufacturers of consumer products and commercial equipment meet the nation's conservation standards. Through its new focus on enforcement, the Department of Energy will save money for consumers and reduce greenhouse gas emissions. "For the sake of our environment and our economy, it's critical that we enforce our energy efficiency regulations," said Scott Blake Harris, former DOE General Counsel. "Strong enforcement of the rules will encourage compliance and keep manufacturers who break the law from having a competitive advantage over manufacturers who play by the rules." DOE enforces the energy and water conservation standards

171

Enforcement Guidance Supplement 01-01, Nuclear Weapon Program Enforcement Issues  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS:01-01 Appendix E-Operational Procedures for Enforcement Department of Energy Washington, DC 20585 October 15, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement

172

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues.

173

RF driven sulfur lamp having driving electrodes arranged to cool the lamp  

DOE Patents [OSTI]

A high intensity discharge lamp without mercury is disclosed radiating a selected spectrum of which can be almost entirely in the visible range from an envelope that contains a sulfur containing substance. The lamp utilizes a signal source that generates an excitation signal that is externally coupled to the exterior surface of the envelope to excite the enclosed sulfur containing substance. Various embodiments of the lamp use electrodes adjacent the envelope to couple the excitation signal thereto with the face of the electrodes shaped to complement the shape of the exterior surface of the envelope. Two shapes discussed are spherical and cylindrical. To minimize filamentary discharges each envelope may include an elongated stem affixed to the exterior thereof whereby a rotational subsystem spins the envelope. In yet another embodiment the envelope has a Dewar configuration with two electrodes, one positioned near the external curved side surface of the body, and a second to the inner surface of the hole through the envelope. Further, the envelope may contain a backfill of a selected inert gas to assist in the excitation of lamp with that backfill at a pressure of less than 1 atmosphere, wherein the backfill pressure is directly related to the increase or decrease of peak output and inversely related to the increase and decrease of the emitted spectrum from the envelope. The emitting fill can be less than 6 mg/cc, or at least 2 mg/cc of the envelope of a sulfur containing substance. 17 figs.

Gabor, G.; Orr, T.R.; Greene, C.M.; Crawford, D.G.; Berman, S.M.

1998-10-20T23:59:59.000Z

174

EPA Redesigns Conversion Certification Policies  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

EPA Redesigns EPA Redesigns Conversion Certification Policies At a recent meeting held in Washington, DC, officials from the U.S. Environmental Protection Agency (EPA) opened dialogue about proposed changes to its emission certification policies that affect alternative fuel vehicles (AFVs). "We are trying to accommo- date the Energy Policy Act (EPAct) and Executive Order requirements while trying to change enforce- ment policies and guidance with respect to conversions," said Rich Ackerman of EPA's Enforcement Office. The meeting, attended by representatives of more than 60 organizations, was held to discuss actions addressing AFV emission certification. Specifically, topics included * Conversion emissions perfor- mance data * Status of environmental laws pertaining to alternative fuel

175

Max Tech and Beyond: High-Intensity Discharge Lamps  

E-Print Network [OSTI]

of color compared with the incandescent reference source isin this report. Standard Incandescent Halogen Low-Pressure:value equivalent to an incandescent filament lamp. Taking

Scholand, Michael

2012-01-01T23:59:59.000Z

176

Lamp for generating high power ultraviolet radiation  

DOE Patents [OSTI]

The apparatus is a gas filled ultraviolet generating lamp for use as a liquid purifier. The lamp is powred by high voltage AC, but has no metallic electrodes within or in contact with the gas enclosure which is constructed as two concentric quartz cylinders sealed together at their ends with the gas fill between the cylinders. Cooling liquid is pumped through the volume inside the inner quartz cylinder where an electrically conductive pipe spaced from the inner cylinder is used to supply the cooling liquid and act as the high voltage electrode. The gas enclosure is enclosed within but spaced from a metal housing which is connected to operate as the ground electrode of the circuit and through which the treated fluid flows. Thus, the electrical circuit is from the central pipe, and through the cooling liquid, the gas enclosure, the treated liquid on the outside of the outer quartz cylinder, and to the housing. The high voltage electrode is electrically isolated from the source of cooling liquid by a length of insulated hose which also supplies the cooling liquid.

Morgan, Gary L. (Elkridge, MD); Potter, James M. (Los Alamos, NM)

2001-01-01T23:59:59.000Z

177

Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement 00-01: Enforcement Position Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. On November 24, 1999, I issued a memorandum providing interim clarification on the EH-Enforcement position on legacy radioactive contamination. That memorandum was issued in response to questions I had received regarding 10 CFR 835 (Occupational Radiation Protection) applicability and potential enforcement related to

178

Enforcement Guidance Supplement 02-01, Enforcement Position Relative to 10 CFR 835 Bioassy Accreditation  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement EGS: 02-01 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 February 21, 2002 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Section 1.3 of the Operational Procedures for Enforcement, published in June 1998,

179

Enforcement Guidance Supplement 99-02  

Broader source: Energy.gov (indexed) [DOE]

EGS 99-02 EGS 99-02 Appendix E - Operational Procedures for Enforcement July 16, 1999 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in its enforcement activities. The focus of this enforcement guidance clarifies internal dosimetry program requirements identified by the Department of

180

Nuclear Safety Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement » Nuclear Safety Enforcement Documents Enforcement » Nuclear Safety Enforcement Documents Nuclear Safety Enforcement Documents Documents Available for Download July 22, 2013 Enforcement Letter, NEL-2013-03 Issued to Lawrence Livermore National Security, LLC related to Programmatic Deficiencies in the Software Quality Assurance Program at the Lawrence Livermore National Laboratory February 12, 2013 Enforcement Letter, NEL-2013-02 Issued to Los Alamos National Security, LLC related to a Radiological Contamination Event at the Los Alamos Neutron Science Center at Los Alamos National Laboratory January 7, 2013 Enforcement Letter, NEL-2013-01 Issued to B&W Pantex, LLC related to the Conduct of Nuclear Explosive Operations at the Pantex Plant October 23, 2012 Enforcement Letter, Controlled Power Company - WEL-2012-02

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Enforcement Letter - BWXT Y-12  

Broader source: Energy.gov (indexed) [DOE]

13, 2004 13, 2004 Mr. Dennis R. Ruddy [ ] BWXT Y-12 P.O. Box 2009 MS 8001 Oak Ridge, TN 37831-8001 Subject: Enforcement Letter Dear Mr. Ruddy: On June 7, 2004, the Department of Energy (DOE)/Na tional Nuclear Security Agency (NNSA) issued a Preliminary Notice of Violation (EA-2004-04), which included a quality improvement citation for continuing Safety Basis compliance issues at Y-12. BWXT Y-12 performance in this area had been the subject of discussion during both the Office of Price-Anderson Enforcement (OE) onsite investigation, held during October 2003, and the subsequent enforcement conference held on January 22, 2004. On August 5, 2004, BWXT Y-12 submitted Noncompliance Tracking System (NTS) report number NTS-Y12- -BWXT-Y12NUCLEAR-2004-0007, titled Corrective Actions

182

Enforcement Cases | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Cases Enforcement Cases Enforcement Cases RSS December 20, 2013 AeroSys: Order (2011-SCE-1624) DOE ordered AeroSys, Inc. (AeroSys) to pay a $100,000 civil penalty after finding AeroSys had (1) failed to certify that certain models of space-constrained central air conditioners and air conditioning heat pumps comply with the applicable energy conservation standards; and (2) manufactured and distributed in commerce in the U.S. units of noncompliant models of space-constrained central air conditioners and air conditioning heat pumps. November 15, 2013 Sylvane: Order (2013-CE-36005) DOE ordered Sylvane, Inc. to pay a $4,000 civil penalty after finding Sylvane had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

183

Enforcement News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Blog » Enforcement News Blog » Enforcement News Enforcement News Worker Safety & Health News November 9, 2012 Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker Safety and Health Violations The U.S. Department of Energy has issued a Preliminary Notice of Violation to Savannah River Nuclear Solutions, LLC for violations of the Department's worker safety and health regulations. August 19, 2010 DOE Cites Washington Closure Hanford for Safety Violations Department of Energy issues a Preliminary Notice of Violation (PNOV) to contractor Washington Closure Hanford (WCH) for violations of DOE's worker safety and health program regulations in 2009 at the Hanford Site in southeast Washington State. More Nuclear Safety News October 4, 2012 Department of Energy Cites Battelle Energy Alliance, LLC for Nuclear Safety

184

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 13, 2009 July 13, 2009 Enforecement Letter, Parsons Infrastructure & Technology Group INC, - July 13, 2009 Enforcement Letter issued to Parsons Infrastructure & Technology Group, Inc., related to a Form Wood Timber Fire at the Salt Waste Processing Facility at the Savannah River Site July 10, 2009 Enforcement Letter , Babcock & Wilcox Technical Services Y-12, LLC - July 10, 2009 Enforcement Letter issued to Babcock & Wilcox Technical Services Y-12, LLC related to the Protection of Classified Information at the Y-12 National Security Complex June 1, 2009 Preliminary Notice of Violation, Western Allied Mechanical, Inc. - WEA-2010-03 Preliminary Notice of Violation issued to Sandia Corporation related to the Inadvertent Ignition of a Rocket Motor May 20, 2009

185

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 5, 2005 August 5, 2005 Consent Order, Bechtel Hanford, Inc - EA-2005-01 Price-Anderson Enforcement Consent Order issued to Bechtel Hanford, Inc. related to Radiological Uptakes at the 618-2 Burial Ground at the Hanford Site, (Consent Order 2005-1) August 4, 2005 Preliminary Notice of Violation, Bechtel Jacobs Company, LLC - EA-2005-04 Preliminary Notice of Violation issued to Bechtel Jacobs Company, LLC, related to the New Hydrofracture Facility Transportation Event and the Personnel Contamination Event at the Hot Storage Garden Facility at the East Tennessee Technology Park July 8, 2005 Enforcement Letter, CH2M Hill Hanford Group, Inc - July 8, 2005 Enforcement Letter issued to CH2M Hill Hanford Group, Inc., related to Neutron Exposure at the Hanford Site June 14, 2005

186

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 26, 1999 February 26, 1999 Preliminary Notice of Violation, International Technology Corporation - EA-1999-01 Preliminary Notice of Violation issued to International Technology Corporation, related to Radiological Work Control Deficiencies at the Salmon Site in Mississippi, (EA-1999-01) February 9, 1999 Enforcement Letter, Argonne National Laboratory-West - February 9, 1999 Enforcement Letter issued to Argonne National Laboratory related to a Dropped Fuel Basket Assembly and Radiation Protection Program Deficiencies at Argonne National Laboratory-West November 24, 1998 Preliminary Notice of Violation, Savannah River Company - EA-97-11 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Quality Assurance Program Deficiencies at the Defense

187

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program...  

Broader source: Energy.gov (indexed) [DOE]

This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01:...

188

Nuclear Safety Enforcement Letter issued to Sandia Corporation...  

Energy Savers [EERE]

Nuclear Safety Enforcement Letter issued to Sandia Corporation Nuclear Safety Enforcement Letter issued to Sandia Corporation 9222014 Enforcement Letter, Sandia Corporation,...

189

EGS 01-01: Nuclear Weapon Program Enforcement Issues  

Office of Environmental Management (EM)

OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for...

190

Enforcement Guidance Supplement 01-01, Nuclear Weapon Program...  

Office of Environmental Management (EM)

OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for...

191

Office of Worker Safety and Health Enforcement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Worker Safety and Health Enforcement Office of Worker Safety and Health Enforcement MISSION The Office of Worker Safety and Health Enforcement implements the Department's worker...

192

Enforcement Letter, WEL-2012-04 - November 5, 2012 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, Controlled Power Company - WEL-2012-02 Enforcement Letter, Safety and Ecology Corporation - NEL-2011-04 Enforcement Letter, WEL-2012-05 - December 20,...

193

Enforcement Guidance Supplement 00-04, Factual Bases for Issuing...  

Broader source: Energy.gov (indexed) [DOE]

Subpart C DOE's Operational Procedures for Enforcement (June 1998), which supercede the DOE Enforcement Handbook (1087-95), provides the Office of Enforcement and Investigation...

194

DEFINING THE EFFECTIVENESS OF UV LAMPS  

Office of Scientific and Technical Information (OSTI)

ARTI-21CR/610-40030-01 ARTI-21CR/610-40030-01 DEFINING THE EFFECTIVENESS OF UV LAMPS INSTALLED IN CIRCULATING AIR DUCTWORK Final Report Date Published - November 2002 Douglas VanOsdell and Karin Foarde RTI P.O. Box 12194 Research Triangle Park, NC 27709-2194 Prepared for the AIR-CONDITIONING AND REFRIGERATION TECHNOLOGY INSTITUTE 4100 N. Fairfax Drive, Suite 200, Arlington, Virginia 22203 Distribution A - Approved for public release; further dissemination unlimited. DISCLAIMER This report was prepared as an account of work sponsored by the Air-Conditioning and Refrigeration Technology Institute (ARTI) under its "HVAC&R Research for the 21 st Century" (21-CR) program. Neither ARTI, the financial supporters of the 21-CR program, or any agency

195

Renewables Portfolio Standard Enforcement Program  

E-Print Network [OSTI]

to be reviewed, the City's RPS Procurement Plan to determine compliance with the RPS Enforcement Program; 5. Annual review of the RPS Procurement Plan shall include consideration of each of the following elements with the provisions in the RPS Procurement Plan, o Review the applicability and appropriateness of excusing

196

Enforcement Guidance Supplement 00-03  

Broader source: Energy.gov (indexed) [DOE]

EGS:00-03 EGS:00-03 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 September 12, 2000 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH- Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in enforcement activities. This enforcement guidance focuses on several issues related to applicability of 10 CFR 830 that have been observed in

197

Application Summary Report 22: LED MR16 Lamps  

SciTech Connect (OSTI)

This report analyzes the independently tested photometric performance of 27 LED MR16 lamps. It describes initial performance based on light output, efficacy, distribution, color quality, electrical characteristics, and form factor, with comparisons to a selection of benchmark halogen MR16s and ENERGY STAR qualification thresholds. Three types of products were targeted. First, CALiPER sought 3000 K lamps with the highest rated lumen output (i.e., at least 500 lm) or a claim of equivalency to a 50 W halogen MR16 or higher. The test results indicate that while the initial performance of LED MR16s has improved across the board, market-available products still do not produce the lumen output and center beam intensity of typical 50 W halogen MR16 lamps. In fact, most of the 18 lamps in this category had lower lumen output and center beam intensity than a typical 35 W halogen MR16 lamp. Second, CALiPER sought lamps with a CRI of 90 or greater. Only four manufacturers were identified with a product in this category. CALiPER testing confirmed the performance of these lamps, which are a good option for applications where high color fidelity is needed. A vast majority of the LED MR16 lamps have a CRI in the low 80s; this is generally acceptable for ambient lighting, but may not always be acceptable for focal lighting. For typical LED packages, there is a fundamental tradeoff between CRI and efficacy, but the lamps in the high-CRI group in this report still offer comparable performance to the rest of the Series 22 products in other performance areas. Finally, CALiPER sought lamps with a narrow distribution, denoted as a beam angle less than 15°. Five such lamps were purchased. Notably, no lamp was identified as having high lumen output (500 lumens or greater), high CRI (90 or greater), a narrow distribution (15° or less), and an efficacy greater than 60 lm/W. This would be an important achievement for LED MR16s especially if output could reach approximately 700 800 lumens, or the approximate equivalent of a 50 W halogen MR16 lamp. Many factors beyond photometric performance should be considered during specification. For example, performance over time, transformer and dimmer compatibility, and total system performance are all critical to a successful installation. Subsequent CALiPER reports will investigate more complex issues.

Royer, Michael P.

2014-07-23T23:59:59.000Z

198

WICF Certification, Compliance and Enforcement webinar | Department...  

Broader source: Energy.gov (indexed) [DOE]

DOE Certification, Compliance, and Enforcement Overview for Refrigerators, Refrigerator-Freezers, Freezers, Dehumidifiers, Room Air Conditioners, Clothes Washers, Clothes...

199

Framework for SCADA Security Policy  

Broader source: Energy.gov (indexed) [DOE]

Framework for SCADA Security Policy Framework for SCADA Security Policy Dominique Kilman Jason Stamp dkilman@sandia.gov jestamp@sandia.gov Sandia National Laboratories Albuquerque, NM 87185-0785 Abstract - Modern automation systems used in infrastruc- ture (including Supervisory Control and Data Acquisition, or SCADA) have myriad security vulnerabilities. Many of these relate directly to inadequate security administration, which precludes truly effective and sustainable security. Adequate security management mandates a clear administrative struc- ture and enforcement hierarchy. The security policy is the root document, with sections covering purpose, scope, posi- tions, responsibilities, references, revision history, enforce- ment, and exceptions for various subjects relevant for system

200

Highly Efficient Small Form Factor LED Retrofit Lamp  

SciTech Connect (OSTI)

This report summarizes work to develop a high efficiency LED-based MR16 lamp downlight at OSRAM SYLVANIA under US Department of Energy contract DE-EE0000611. A new multichip LED package, electronic driver, and reflector optic were developed for these lamps. At steady-state, the lamp luminous flux was 409 lumens (lm), luminous efficacy of 87 lumens per watt (LPW), CRI (Ra) of 87, and R9 of 85 at a correlated color temperature (CCT) of 3285K. The LED alone achieved 120 lumens per watt efficacy and 600 lumen flux output at 25 C. The driver had 90% electrical conversion efficiency while maintaining excellent power quality with power factor >0.90 at a power of only 5 watts. Compared to similar existing MR16 lamps using LED sources, these lamps had much higher efficacy and color quality. The objective of this work was to demonstrate a LED-based MR16 retrofit lamp for replacement of 35W halogen MR16 lamps having (1) luminous flux of 500 lumens, (2) luminous efficacy of 100 lumens per watt, (3) beam angle less than 40{sup o} and center beam candlepower of at least 1000 candelas, and (4) excellent color quality.

Steven Allen; Fred Palmer; Ming Li

2011-09-11T23:59:59.000Z

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Enforcement Guidance Supplement 02-01 Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation  

Broader source: Energy.gov (indexed) [DOE]

February 21, 2002 February 21, 2002 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance

202

Enforcement Guidance Supplement 98-01:Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d)  

Broader source: Energy.gov [DOE]

The DOE Enforcement Handbook (1087-95) provides the Office of Enforcement and Investigation with the opportunity to issue interim clarifying guidance occasionally with respect to the processes to be used in this office (see Section 1.3- Interim Enforcement Guidance). In particular, it is important to assist contractors and others on the relationships between the requirements of Part 820 and the Enforcement Policy, 10 CFR 820, Appendix A.

203

Enforcement Guidance Supplement 02-01:Enforcement Position Relative to 10  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Position Relative Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Enforcement Guidance Supplement 02-01:Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors. Enforcement Guidance Supplement 02-01:Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation More Documents & Publications

204

Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Position Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors. Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation More Documents & Publications

205

Maintaining optimum fluorescent lamp performance under elevated temperature conditions  

SciTech Connect (OSTI)

This paper describes a new technique for optimizing fluorescent lamp performance under elevated temperature conditions. This approach uses a thermo-electric Peltier device to produce a localized cold spot temperature of approximately 40/sup 0/C, allowing the lamps to maintain maximum light output and efficacy independent of prevailing ambient temperatures inside a luminaire. Experimental data show that a 20% increase in light output and a 10% increase in efficacy over typical lamp performance in a warm fixture environment can be obtained using this device. Only 0.25 watts must be supplied to the Peltier device to produce these results.

Siminovitch, M.J.; Rubinstein, F.M.; Clark, T.A.; Verderber, R.R.

1986-04-01T23:59:59.000Z

206

Office of Enforcement - Regulatory Assistance Reviews  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regulatory Assistance Reviews Regulatory Assistance Reviews Office of Enforcement and Oversight (formerly Program Reviews) Enforcement Regulatory Assistance Reviews evaluate contractor programs for identifying, evaluating, reporting and correcting noncompliances. The objective of these reviews is to work collaboratively with sites to identify areas where program effectiveness can be improved and ensure that noncompliances are being proactively self-identified. 2013 Office of Security Enforcement Regulatory Assistance Review of Battelle at the Pacific Northwest National Laboratory, July 18, 2013 Office of Worker Safety and Health Enforcement Regulatory Assistance Review of L ATA Environmental Services of Kentucky, LLC at the Paducah Gaseous Diffusion Plant, February 11, 2013 Office of Security Enforcement Regulatory Assistance Review of

207

Security Enforcement Reporting Criteria | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Security Enforcement Reporting Criteria Security Enforcement Reporting Criteria Security Enforcement Reporting Criteria Classified information security noncompliances are categorized according to the disclosure or potential disclosure of DOE classified information placed at risk. There are two categories of noncompliances that are based on the relative severity of a classified information security incident. The categories are identified by an event category and type. Each of the two categories is further subdivided into three types based on the type of interest (security interest, management interest, and procedural interest). Security Enforcement Reporting Criteria More Documents & Publications Safety and Security Enforcement Coordinator Handbook DOE-STD-1210-2012 HQFMSP Chapter 11, Incidents of Security Concern

208

Enforcement Action 2003-04  

Broader source: Energy.gov (indexed) [DOE]

Washington, DC 20585 Washington, DC 20585 September 3, 2003 Dr. Michael R. Anastasio [ ] Lawrence Livermore National Laboratory P.O. Box 808, L-001 Livermore, CA 94551-0808 EA-2003-04 Subject: Preliminary Notice of Violation and Proposed Civil Penalty $137,500 (Waived by Statute) Dear Dr. Anastasio: This letter refers to the recent investigation by the Department of Energy's Office of Price-Anderson Enforcement (OE) of the June 2002 extremity radiological overexposure event in [ ]. An Investigation Summary Report describing the results of that review was issued to you on May 15, 2003. An Enforcement Conference was held on June 23, 2003, in Germantown, Maryland, with members of your staff to discuss these findings. A Conference Summary Report is enclosed.

209

Argonne National Laboratory - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Argonne National Laboratory Preliminary Notice of Violation issued to the University of Chicago related to Nuclear Safety Program Deficiencies at Argonne National Laboratory, March 7, 2006 (EA-2006-02) - University of Chicago/Argonne National Laboratory - Press Release, March 7, 2006 Preliminary Notice of Violation issued to the University of Chicago related to the Uncontrolled Release of Radioactive Material at Argonne National Laboratory-East, August 14, 2001 (EA-2001-05) - Argonne National Laboratory - Press Release, August 17, 2001 Preliminary Notice of Violation issued to the University of Chicago related to Programmatic Management Failures at Argonne National Laboratory-West, February 28, 2001 (EA-2001-01) - Argonne National Laboratory-West - Press Release, March 2, 2001

210

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 11, 2000 September 11, 2000 Enforcement Letter, Kaiser-Hill Company, L.L.C - September 11, 2000 Issued to Kaiser-Hill Company, LLC related to Noncompliances with Design and Procurement Requirements at the Rocky Flats Environmental Technology Site August 24, 2000 Preliminary Notice of Violation, Lockheed Martin Energy Systems - EA-2000-11 Preliminary Notice of Violation issued to Lockheed Martin Energy Systems, related to Quality Assurance Issues at the Y-12 National Security Complex, (EA-2000-11) July 25, 2000 Consent Order, Fluor Federal Services - EA-2000-10 Price-Anderson Enforcement Consent Order issued to Fluor Federal Services related to Quality Problems at the Tank Farm Waste Remediation System at the Hanford Site, July 25, 2000 (EA-2000-10) July 25, 2000 Consent Order, CH2M Hill Hanford Group, Inc. - EA-2000-09

211

DMP ENFORCEMENT LETTER ELDMP102804  

Broader source: Energy.gov (indexed) [DOE]

28, 2004 28, 2004 Mr. C. Delbert Marcum [ ] Diversified Metal Products, Inc. 3710 N. Yellowstone Highway P.O. Box 1404 Idaho Fall, Idaho 83403 Subject: Enforcement Letter for Transportainer Fabrication Deficiencies Dear Mr. Marcum: This letter addresses deficiencies associated with the fabrication of four transportainers delivered under contract to Washington TRU Solutions LLC (WTS) in support of their Characterization and Repackaging Modular Unit development. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed your performance in delivering these transportainers and is concerned with the quality assurance aspects of your work activities in fabricating the transportainers. Specifically, three areas of deficiency were noted and are provided below in more detail:

212

Enforcement News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 23, 2010 September 23, 2010 DOE Resolves Nearly One-Third of 27 Recently Filed Civil Penalty Cases The Department has successfully resolved eight of the 27 enforcement cases brought just two weeks ago against companies for selling products without properly certifying their compliance with the Department's conservation standards. The swift resolution of nearly one-third of these cases reflects the central goal of the Department's enforcement effort - compliance with all aspects of the Department's regulations to ensure that consumers have the information they need to buy energy a September 21, 2010 DOE Requires Air-Con International to Cease Sales of Inefficient Air Conditioners and Proposes Penalties The Department has issued a Notice of Noncompliance Determination and

213

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 28, 2007 September 28, 2007 Preliminary Notice of Violation,University of California - EA-2007-02 Notice of Violation issued to the University of California related to the Unauthorized Reproduction and Removal of Classified Matter from the Los Alamos National Laboratory September 18, 2007 Preliminary Notice of Violation, BWXT Y-12 LLC - EA-2007-04 Preliminary Notice of Violation issued to BWXT Y-12, LLC, related to Criticality Safety Controls at the Y-12 National Security Complex September 6, 2007 Enforcement Letter, CH2M Hill Hanford Group Inc, - September 6, 2007 Enforcement Letter issued to CH2M Hill Hanford Group, Inc., related to Quality Improvement Deficiencies at the Hanford Tank Farms July 13, 2007 Preliminary Notice of Violation, Los Alamos National Laboratory -

214

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 19, 1998 September 19, 1998 Preliminary Notice of Violation, Bechtel Hanford, Inc. - EA-97-08 Preliminary Notice of Violation issued to Bechtel Hanford, Inc., related to Unplanned Radioactive Material Uptakes by Five Workers at the Hanford Site, (EA-97-08) August 4, 1998 Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4, 1998 Issued to Lockheed Martin Idaho Technologies Company related to a Repetitive Problem with Instrument Operability at the Idaho National Engineering and Environmental Laboratory July 31, 1998 Enforcement Letter, Fluor Daniel Hanford, Inc - July 31, 1998 Issued to Fluor Daniel Hanford, Inc., related to Incomplete Corrective Actions at the Hanford Site, July 31, 1998 July 28, 1998 Preliminary Notice of Violation, Lawrence Livermore National Laboratory -

215

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 2 Preliminary Notice of Violation, Fluor Hanford, Incorporated - EA-2002-03 Preliminary Notice of Violation issued to Fluor Hanford, Incorporated, related to Quality Assurance issues at the Hanford Site. August 13, 2002 Preliminary Notice of Violation, Bechtel Hanford, Inc., - EA-2002-04 Preliminary Notice of Violation issued to Bechtel Hanford, Inc., related to Quality Assurance Deficiencies associated with the Nondestructive Assay Services at the Hanford Site June 19, 2002 Enforcement Letter, Kaiser-Hill Company, L.L.C. - June 19, 2002 Enforcement Letter issued to Kaiser-Hill Company, LLC related to Unplanned Radioactive Material Uptakes at the Rocky Flats Environmental Technology Site June 13, 2002 Preliminary Notice of Violation, BWXT Idaho, LLC - EA-2002-02

216

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 4, 2000 May 4, 2000 Enforcement Letter, Babcock & Wilcox of Ohio, Inc - May 4, 2000 Issued to Babcock & Wilcox of Ohio, Inc., related to Deficiencies in the Unresolved Safety Question Process at the Miamisburg Environmental Management Project April 17, 2000 Preliminary Notice of Violation, MOTA Corporation - EA-2000-03 Preliminary Notice of Violation issued to MOTA Corporation, related to the Unauthorized Removal of Material at Building 211 at Argonne National Laboratory-East, (EA-2000-03) March 29, 2000 Enforcement Letter, Building 703-A - March 29, 2000 Issued to Westinghouse Savannah River Company related to Training Issues at the Savannah River Site March 19, 2000 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2000-05 Preliminary Notice of Violation issued to Kaiser-Hill Company, LLC, related

217

Enforcement Letter - ELBWXT082902WS  

Broader source: Energy.gov (indexed) [DOE]

858 858 August 29, 2002 Dr. D. B. Shipp [ ] Bechtel BWXT Idaho, L.L.C. 2525 Freemont Avenue Idaho Falls, Idaho 83415 Subject: RWMC Enforcement Letter (NTS-ID--BBWI-RWMC-2002-0002) Dear Dr. Shipp: During July 16-17, 2002, personnel from the DOE Office of Price-Anderson Enforcement (OE) conducted an onsite investigation at the Radioactive Waste Management Complex (RWMC) of multiple events occurring during 2001-2002. The events all involved transuranic (TRU) waste characterization, handling, and shipping activities. The investigation included a detailed review of the March 2002 event in which an incorrect payload of TRU waste drums was shipped to the Waste Isolation Pilot Plant (WIPP). OE also reviewed an additional seven similar events occurring in

218

2011 DOE Safety and Security Enforcement Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2011 DOE Safety and Security Workshop 2011 DOE Safety and Security Workshop Enforcement Home Registration - CLOSED Agendas Day 1 Agenda and Presentations Day 2 Agenda and Presentations Hotel Information Enforcement Home 2011 DOE Safety and Security Enforcement Workshop Office of Enforcement and Oversight The Office of Health, Safety and Security's (HSS) Office of Enforcement will be hosting its 2011 DOE Safety and Security Enforcement Workshop on the dates and location provided below. When: April 5 - 7, 2011 April 5 and 6 are open to Federal employees and contractors (8 am - 5 pm) April 7 is a half-day session for Federal participants only (8 - 11:30 am) The Energy Facility Contractors Group (EFCOG) Enforcement Coordination Working Group will be holding a meeting on April 7 at the Nevada Support Facility. For more information about that meeting, click here.

219

Covered Product Category: Compact Fluorescent Lamps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Covered Product Category: Compact Fluorescent Lamps Covered Product Category: Compact Fluorescent Lamps Covered Product Category: Compact Fluorescent Lamps October 7, 2013 - 10:48am Addthis ENERGY STAR Qualified Products Federal Energy Management Program (FEMP) provides acquisition guidance across a variety of product categories, including compact fluorescent lamps (CFLs), which are an ENERGY STAR-qualified product category. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. Most manufacturers display the ENERGY STAR label on complying models. For a model not displaying this label, check the manufacturer's literature to determine if it meets the efficiency requirements outlined by ENERGY STAR.

220

Information Resources: LED Replacements for Linear Fluorescent Lamps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Replacements for Linear Fluorescent Lamps Webcast Replacements for Linear Fluorescent Lamps Webcast In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting Facts-listed products as well as products evaluated in the latest CALiPER reports. Eric Richman, also of PNNL, reported on a recently completed GATEWAY demonstration project, in which LED and fluorescent lamps were installed in a variety of recessed troffer luminaires for comparison in an office environment. The presentation concluded with a discussion of specifications listed in a newly updated technology fact sheet. View presentation slides View the text-alternative version View the webcast (WMV 16 MB) Download Windows Media Player

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Burst Radio-Frequency Excited Pulsed Hollow-Cathode Lamp  

Science Journals Connector (OSTI)

Transient emission characteristics of a hollow-cathode lamp driven by a pulsed current in combination with a radio-frequency burst signal are described. The radio-frequency field...

Araki, Tsutomu; Walters, John P; Minami, Shigeo

1980-01-01T23:59:59.000Z

222

DOE Publishes Long-Term Testing Investigation of Retail Lamps  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's CALiPER program has released another special report on LED lamps that are available through the retail marketplace and targeted toward general consumers. CALiPER...

223

Conservation Potential of Compact Fluorescent Lamps in India and Brazil  

E-Print Network [OSTI]

38 TWh, 10% of which was for incandescent lighting (Fig. 3).The electricity consumed in incandescent lighting can be300 and 400 million incandescent lamps in the country. Let

Gadgil, A.J.

2008-01-01T23:59:59.000Z

224

Optimized Magnetic Components Improve Efficiency of Compact Fluorescent Lamps  

E-Print Network [OSTI]

xtures (designed for incandescent bulbs) has allowed residential and small commercial electric customers of incandescent lamps and last 10 times longer [1]. High-frequency electronic ballasts are used to power CFLs

225

DOE Publishes New CALiPER Report on Retail Lamps  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's CALiPER program has released a special report on LED lamps available through the retail marketplace and targeted toward general consumers. While previous reports in...

226

Magnetic fluorescent lamp having reduced ultraviolet self-absorption  

DOE Patents [OSTI]

The radiant emission of a mercury-argon discharge in a fluorescent lamp assembly (10) is enhanced by providing means (30) for establishing a magnetic field with lines of force along the path of electron flow through the bulb (12) of the lamp assembly, to provide Zeeman splitting of the ultraviolet spectral line. Optimum results are obtained when the magnetic field strength causes a Zeeman splitting of approximately 1.7 times the thermal line width.

Berman, Samuel M. (San Francisco, CA); Richardson, Robert W. (Pelham, NY)

1985-01-01T23:59:59.000Z

227

Perceptions of compact fluorescent lamps in the residential market  

SciTech Connect (OSTI)

Compact fluorescent lamps offer significant energy savings over other forms of residential lighting and last up to 10 times longer than conventional incandescent bulbs. In order to better understand existing barriers to acceptance and future opportunities for growth of compact fluorescent lighting in the residential retrofit sector, a three stage research project was designed and conducted by MACRO Consulting, Inc. Assessment of whether or not the benefits of compact fluorescent lamps are sufficient to overcome price resistance was one of the major purposes of this project. Residential customers were interviewed in focus group sessions to help determine key issues and motivating forces in the lighting/energy saving/cost saving equation. Residential customers in 5 major market areas were contacted by telephone, and data about their awareness, knowledge and use of compact fluorescent lighting were collected. These customers also participated in an attribute rating exercise in which compact fluorescent lamps were compared with fluorescent tubes and incandescent bulbs on a series of product attributes. A price elasticity exercise was also conducted. Teleconferences with retailers of compact fluorescent lamps were conducted in order to explore their knowledge of and attitudes towards compact fluorescent lamps. Customers agree that energy savings and longer life are both positive attributes for residential lighting products, but they are not yet ready to make the switch away from inexpensive, versatile and readily available incandescent bulbs to compact fluorescent lamps. Compact fluorescent lamps are rated poorly (even by satisfied'' users) on each of seven positive attributes of home lighting. Major barriers to increased use of compact fluorescent lamps include price, convenience, and performance. Prices above $10 are considered outrageous''. Product improvements are needed for appearance, light output and versatility.

Weiner, J.; Campbell, C.J. (Macro Consulting, Inc., Mountain View, CA (United States))

1992-07-01T23:59:59.000Z

228

Enforcement Guidance Supplement 99-01:Enforcement of 10 CFR Part 830.120  

Broader source: Energy.gov (indexed) [DOE]

Enforcement of 10 CFR Part Enforcement of 10 CFR Part 830.120 (Quality Assurance Rule)for Facilities Below Hazard Category III Enforcement Guidance Supplement 99-01:Enforcement of 10 CFR Part 830.120 (Quality Assurance Rule)for Facilities Below Hazard Category III Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) periodically to issue clarifying guidance regarding the processes used in its enforcement activities. During the past 18 months, EH Enforcement has identified a number of examples in which both DOE and contractor organizations have incorrectly exempted activities fromapplicability of the DOE Quality Assurance Rule 10 CFR 830.120 (QA Rule). The contractors excluded these activities on the

229

Enforcement Guidance Supplement 99-01: Enforcement of 10 CFR Part 830.120  

Broader source: Energy.gov (indexed) [DOE]

Enforcement of 10 CFR Part Enforcement of 10 CFR Part 830.120 (Quality Assurance Rule) for Facilities below Hazard Category III Enforcement Guidance Supplement 99-01: Enforcement of 10 CFR Part 830.120 (Quality Assurance Rule) for Facilities below Hazard Category III Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) periodically to issue clarifying guidance regarding the processes used in its enforcement activities. During the past 18 months, EH Enforcement has identified a number of examples in which both DOE and contractor organizations have incorrectly exempted activities from applicability of the DOE Quality Assurance Rule 10 CFR 830.120 (QA Rule). The contractors excluded these activities on the

230

Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the  

Broader source: Energy.gov (indexed) [DOE]

1: Enforcement Position 1: Enforcement Position Relative to the Discovery/Control of Legacy Contamination Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. On November 24, 1999, I issued a memorandum providing interim clarification on the EH-Enforcement position on legacy radioactive contamination. That memorandum was issued in response to questions I had received regarding 10 CFR 835 (Occupational Radiation Protection) applicability and potential

231

Compact fluorescent lamp using horizontal and vertical insulating septums and convective venting geometry  

DOE Patents [OSTI]

A novel design is described for a compact fluorescent lamp, including a lamp geometry which will increase light output and efficacy of the lamp in a base down operating position by providing horizontal and vertical insulating septums positioned in the ballast compartment of the lamp to provide a cooler coldspot. Selective convective venting provides additional cooling of the ballast compartment. 9 figs.

Siminovitch, M.

1998-02-10T23:59:59.000Z

232

A light diet for a giant appetite: An assessment of China's proposed fluorescent lamp standard  

E-Print Network [OSTI]

standard for linear fluorescent lamps Length (mm) Minimum efficacy (lm/W) Efficacy for energy conservation

Lin, Jiang

2002-01-01T23:59:59.000Z

233

All mercury lamps contain small amounts of mercury. An electric current passes through the lamp and vaporizes the mercury to generate light. Recycling mercury containing lamps protects human health and our environment from heavy  

E-Print Network [OSTI]

All mercury lamps contain small amounts of mercury. An electric current passes through the lamp and vaporizes the mercury to generate light. Recycling mercury containing lamps protects human health and our the environment by recycling universal wastes, contact EH&S at (949) 824-6200 or visit: www.ehs.uci.edu Mercury

George, Steven C.

234

Enforcement News | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 30, 2010 June 30, 2010 DOE Seeks Comment on Application of Clothes Washer Test Procedure Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer a warm rinse option that is not included in the recommended cycle for washing cotton or linen clothes. The Department is soliciting feedback from the public on the draft interpretive rule, which is available here, until July 30, 2010. June 24, 2010 DOE Requires Manufacturer and Labeler to Cease Sale of Incandescent Reflector Lamps DOE has issued Notices of Non-Compliance Determination to Westinghouse Lighting Corporation and Fuzhou Sunlight Lighting Electrical Appliance Company requiring that they halt the sale of 8 basic models of incandescent

235

Microfabrication Policies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Polcies Booking Login Policy Cleanroom Policy Equipment Use Policy 2 Person Rule Experimental Hall Policy After Hours Policy...

236

Enforcement Guidance Supplement 98-01, Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10(d)  

Broader source: Energy.gov (indexed) [DOE]

5, 1998 5, 1998 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: SUBJECT: DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) The DOE Enforcement Handbook (1087-95) provides the Office of Enforcement and lnvestigation with the opportunity to issue interim clarifying guidance occasionally with respect to the processes to be used in this office (see Section 1.3- Interim Enforcement Guidance). In particular, it is important to assist contractors and others on the relationships between the requirements of Part 820 and the Enforcement Policy, 10 CFR 820, Appendix A. The main purpose of both the regulation and the Enforcement Policy is to assure

237

Policy Name: Bicycle, Rollerblade, Scooter and Skateboard Policy Originating/Responsible Department: University Safety  

E-Print Network [OSTI]

Policy Name: Bicycle, Rollerblade, Scooter and Skateboard Policy Originating/Responsible Department encourages the use of bicycles, rollerblades, scooters, and skateboards in a safe and courteous manner, this policy sets out the regulations and methods of enforcement for the use of bicycles, rollerblades

Carleton University

238

Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks Page 1 Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks  

E-Print Network [OSTI]

Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks Page 1 Assessing the Risk of Mercury in Drinking Water after UV Lamp Breaks Heidi Borchers University of New Hampshire, Environmental Ultraviolet (UV) lamps generate ultraviolet light through the vaporization of elemental mercury, by using

239

POLICY SECTIONS POLICY OFFICE  

E-Print Network [OSTI]

POLICY SECTIONS POLICY OFFICE POLICIES FORMS PROCEDURES UNIVERSITY POLICY #12;guide to WRITING POLICIES Administrative policies align opera- tions, set behavior expectations across the University system and communicate policy roles and responsibilities. You, as the policy owner or writer, have the important task

Minnesota, University of

240

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying...

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

WICF Certification, Compliance and Enforcement webinar  

Broader source: Energy.gov (indexed) [DOE]

WICF Testing, Certification, WICF Testing, Certification, Compliance, and Enforcement Overview August 30, 2011 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Agenda 2 Certified Ratings 3 1 Testing Basic Model Enforcement 4 5 Manufacturer How to Submit Questions 6 3 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer of a WICF * Is a domestic manufacturer or an importer. * Produces a component of a walk-in cooler or walk-in freezer that affects energy consumption, including, but not limited to, refrigeration, doors, lights, windows, or walls.

242

Waste Isolation Pilot Plant - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Waste Isolation Pilot Plant Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant, September 8, 2006 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC, related to Radiological Uptakes at the Mobile Visual Examination and Repackaging Facility at Lawrence Livermore National Laboratory, December 22, 2005 (EA-2005-08) - Washington TRU Solutions, LLC - Press Release, December 22, 2005 Enforcement Letter issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant, October 28, 2004

243

Enforcement Letter, Westinghouse Hanford Corporation - July 6...  

Broader source: Energy.gov (indexed) [DOE]

July 6, 1995 Enforcement Letter, Westinghouse Hanford Corporation - July 6, 1995 July 6, 1995 Issued to Westinghouse Hanford Corporation related to Radiological Work Control...

244

Enforcement Documents - Hanford | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

radiological doses to four individuals at the Plutonium Finishing Plant at DOE's Hanford Site. September 13, 2012 Enforcement Letter, NEL-2012-02 - September 13, 2012 Issued...

245

Enforcement Letter, Westinghouse Hanford Corporation - September...  

Broader source: Energy.gov (indexed) [DOE]

September 22, 1995 Enforcement Letter, Westinghouse Hanford Corporation - September 22, 1995 September 22, 1995 Issued to Westinghouse Hanford Corporation related to Operational...

246

Enforcement Documents - Argonne National Laboratory | Department...  

Broader source: Energy.gov (indexed) [DOE]

Argonne National Laboratory Enforcement Documents - Argonne National Laboratory April 10, 2014 Consent Order, UChicago Argonne, LLC - NCO-2014-01 Issued to UChicago Argonne, LLC,...

247

Enforcement Documents - West Valley Demonstration Project | Department...  

Broader source: Energy.gov (indexed) [DOE]

West Valley Demonstration Project Enforcement Documents - West Valley Demonstration Project December 7, 1999 Preliminary Notice of Violation, West Valley Nuclear Services -...

248

Pantex Enforcement Letter | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

of Enforcement and Oversight has evaluated the facts and circumstances surrounding the conduct of nuclear explosive operations at Pantex Plant, during the period August 2011 -...

249

Enforcement Letter, Brookhaven Science Associates - January 16...  

Broader source: Energy.gov (indexed) [DOE]

Science Associates - January 16, 2002 Enforcement Letter, Brookhaven Science Associates - January 16, 2002 January 16, 2002 Issued to Brookhaven Science Associates related to...

250

B&W Pantex Enforcement Letter  

Office of Environmental Management (EM)

Mr. Woolery: Department of Energy Washington, DC 20585 January 7, 2013 The Office of Health, Safety and Security's Office of Enforcement and Oversight has evaluated the facts and...

251

Safety and Security Enforcement Process Overview | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Energy (DOE) Office of Enforcement and Oversight (HS-40), within the Office of Health, Safety and Security (HSS), to implement DOE's regulatory obligations as authorized by...

252

Enforcement Letter Issued to LVI Services, Inc  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Tennessee 37922 WEL-2013-03 Dear Mr. Gilmore: This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the...

253

Enforcement Letter, Parsons Technology Development & Fabrication...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 April 13, 2010 Issued to...

254

Enforcement Letter, Geiger Brothers Mechanical Contractors, INC...  

Broader source: Energy.gov (indexed) [DOE]

Geiger Brothers Mechanical Contractors, INC - March 26, 2010 Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26, 2010 March 26, 2010 Issued to Geiger...

255

Nuclear Safety Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Paducah Gaseous Diffusion Plants March 26, 2010 Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26, 2010 Issued to Geiger Brothers Mechanical Contractors,...

256

Enforcement Documents - Portsmouth Gaseous Diffusion Plant |...  

Broader source: Energy.gov (indexed) [DOE]

Gaseous Diffusion Plant March 26, 2010 Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26, 2010 Issued to Geiger Brothers Mechanical Contractors,...

257

Enforcement InfoCenter | Department of Energy  

Office of Environmental Management (EM)

More Nuclear Safety Documents December 2, 2014 Consent Order, Battelle Energy Alliance - NCO-2014-02 Nuclear Safety Enforcement Consent Order issued to Battelle Energy...

258

Enforcement Letter, Battelle Energy Alliance, LLC - September...  

Broader source: Energy.gov (indexed) [DOE]

Energy Alliance, LLC - September 14, 2009 Enforcement Letter, Battelle Energy Alliance, LLC - September 14, 2009 September 14, 2009 Issued to Battelle Energy Alliance, LLC related...

259

Enforcement Guidance Supplement 02-01:Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors.

260

Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors.

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination  

Broader source: Energy.gov (indexed) [DOE]

1 1 Appendix E - Operational Procedures for Enforcement May 4, 2000 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. On November 24, 1999, I issued a memorandum providing interim clarification on the EH-Enforcement position on legacy radioactive contamination. That memorandum was

262

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 3, 1999 September 3, 1999 Preliminary Notice of Violation, Los Alamos National Laboratory - EA-1999-08 Preliminary Notice of Violation issued to the University of California related to Deficiencies in Work Controls at the Los Alamos National Laboratory Chemistry and Metallurgy Research Facility, (EA-1999-08) August 20, 1999 Enforcement Letter, International Isotopes Idaho Inc - August 20, 1999 Issued to International Isotopes Idaho, Inc. related to the Relocation of an Irradiated Pellet at the Test Reactor Area Hot Cell Facility at the Idaho National Engineering and Environmental Laboratory August 18, 1999 Preliminary Notice of Violation, Lockheed Martin Idaho Technologies Company - EA-1999-07 Preliminary Notice of Violation issued to Lockheed Martin Idaho Technologies Company, related to Procurement, Quality Assurance, Emergency

263

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 4, 1997 September 4, 1997 Enforcement Letter, Lockheed Martin Energy Systems, Inc. - September 4, 1997 Issued to Lockheed Martin Energy Systems, Inc., related to the Erroneous Transfer of Mixed Waste to a Landfill at the K-25 Site August 14, 1997 Preliminary Notice of Violation, Sandia Corporation - EA-97-07 Preliminary Notice of Violation issued to Sandia Corporation, related to Radiological Work Control Deficiencies at the Radioactive and Mixed Waste Management Facility at Sandia National Laboratories, (EA-97-07) August 14, 1997 Preliminary Notice of Violation, Sandia Corporation - EA-97-06 Preliminary Notice of Violation issued to Sandia Corporation, related to the Scram, Restart, and Destruction of Records for the Annular Core Research Reactor at Sandia National Laboratories, (EA-97-06)

264

Enforcement Action 2002-05  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration National Nuclear Security Administration Washington, DC 20585 December 17, 2002 Dr. John Browne [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 EA-2002-05 Subject: Preliminary Notice of Violation and Proposed Civil Penalty $220,000 (Waived by Statute) Dear Dr. Browne: This letter refers to the recent investigation by the Department of Energy (DOE)/ National Nuclear Security Administration (NNSA) of the unauthorized staging and storage of transuranic (TRU) waste in PF-185 from March 1996 until June 2001. Following consultation with my office, the Department's Office of Price-Anderson Enforcement (OE) initiated an investigation in March 2002. The scope of the investigation included: (1) failures leading to the establishment of an unauthorized

265

Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 31, 2011 May 31, 2011 Enforcement Letter, NEL-2011-01 Issued to LATA Environmental Services of Kentucky, LLC, regarding work control issues that resulted in the release of uranium hexafluoride (UF6) at the Paducah Gaseous Diffusion Plant May 27, 2011 Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01 Consent Order issued to Washington River Protection Solutions, LLC related to deficiencies in the corrective action management program, radiation control program, and sealed radioactive source accountability and control program April 18, 2011 Preliminary Notice, Battelle Energy Alliance, LLC, SEA-2011-01 Issued to Battelle Energy Alliance, LLC related to Classified Information Introduced into Unapproved Information Systems at the Idaho National Laboratory

266

2014-12-30 Issuance: Energy Conservation Standard for General Service Fluorescent Lamps and Incandescent Reflector Lamps; Final Rule  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule regarding energy conservation standards for general service fluorescent lamps and incandescent reflector lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on December 30, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

267

2014-10-20 Issuance: ASRAC Regional Standards Enforcement Working...  

Energy Savers [EERE]

2014-10-20 Issuance: ASRAC Regional Standards Enforcement Working Group; Notice of Open Meeting 2014-10-20 Issuance: ASRAC Regional Standards Enforcement Working Group; Notice of...

268

2014-04-17 DOE Certification, Compliance, and Enforcement Overview...  

Broader source: Energy.gov (indexed) [DOE]

04-17 DOE Certification, Compliance, and Enforcement Overview for Plumbing Products 2014-04-17 DOE Certification, Compliance, and Enforcement Overview for Plumbing Products This...

269

Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations...  

Energy Savers [EERE]

Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations Notice - DOE Guidance on Energy Efficiency...

270

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment...  

Office of Environmental Management (EM)

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program Reviews Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program...

271

Enforcement Guidance Supplement 03-02: Revision to Occurrence...  

Broader source: Energy.gov (indexed) [DOE]

for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the...

272

DOE and the Bureau of Safety and Environmental Enforcement Sign...  

Broader source: Energy.gov (indexed) [DOE]

of Safety and Environmental Enforcement Sign Memorandum of Collaboration for Safe Offshore Energy Development DOE and the Bureau of Safety and Environmental Enforcement Sign...

273

2015 DOE Safety and Security Enforcement Workshop - Badging and...  

Office of Environmental Management (EM)

2015 DOE Safety and Security Enforcement Workshop - Badging and Facility Information 2015 DOE Safety and Security Enforcement Workshop - Badging and Facility Information January...

274

Enforcement Notice of Intent to Investigate, Nuclear Waste Partnership...  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Waste Partnership, LLC Enforcement Notice of Intent to Investigate, Nuclear Waste Partnership, LLC June 16, 2014 DOE Office of Enforcement issues a Notice of Intent to...

275

Enforcement Letter, Argonne National Laboratory-West - February...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- In the Matter of Bernard F. Cowan Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000...

276

Energy Code Compliance and Enforcement Best Practices (Text Version...  

Broader source: Energy.gov (indexed) [DOE]

Energy Code Compliance and Enforcement Best Practices (Text Version) Energy Code Compliance and Enforcement Best Practices (Text Version) Curtis Framel: Good afternoon, and good...

277

Confirmation of the chromosomal localization of human lamp genes and their exclusion as candidate genes for Salla disease  

Science Journals Connector (OSTI)

Salla disease is an inherited lysosomal storage disorder caused by accumulation of free sialic acid in the lysosomes. Lamp genes, lamp A and lamp B (lysosome associated membrane proteins), are the first known ...

Johanna Schleutker; Leena Haataja; Martin Renlund; Lea Puhakka…

1991-11-01T23:59:59.000Z

278

Low-pressure microwave plasma ultraviolet lamp for water purification  

Science Journals Connector (OSTI)

Low-pressure mercury lamps are commonly used for germicidal applications. The germicidal effect is due to the emission of light at 254 nm, which leads to the destruction of the most waterborne bacteria and viruses. The microwave plasma ultraviolet (UV) lamp (MPUVL) is a new technology for generating a high-intensity UV light and that can be also controlled to operate at 185 nm; irradiation is in air at this wavelength produces ozone. The microwave power is injected into a resonant cavity and the surface wave excitation takes place within the cavity through that part of the discharge tube (fused silica) protruding inside it. The MPUVL has many advantages over conventional lamps, which are limited to an output power in the region of 30 W m-1, while MPUVL can deliver any amount of power per unit length and the tube can be of any shape, length or diameter. This paper describes the design of the MPUVL and compares its efficiency with that of conventional lamps through spectral analysis. Other results, which include the effects of temperature and different power inputs, are also discussed.

A I Al-Shamma'a; I Pandithas; J Lucas

2001-01-01T23:59:59.000Z

279

The Energy Efficiency of the U.S Fluorescent Lamp Ballast Industry  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Energy Efficiency of the U.S Fluorescent Lamp Ballast Industry The Energy Efficiency of the U.S Fluorescent Lamp Ballast Industry Speaker(s): Francis Rubinstein Date: February 14, 2008 - 12:00pm Location: 90-3122 Fluorescent lamp ballasts are subject to DOE appliance standards and rulemaking. But currently, only ballasts for older fluorescent lamp types, such as T-12 lamps are subject to minimum efficacy limits. The majority of fluorescent lamps now being shipped (T-8 and T-5 types) type are operated by ballasts that will not be subject to DOE rule until 2011. The metric used by DOE for characterizing the electrical efficiency of the fluorescent lamp-ballast system is called Ballast Efficacy Factor (BEF). Because BEF is not normalized, it is of limited utility for rulemaking and is useless for procurement. But by normalizing BEF to the total lamp power, I have

280

Solid-State Lighting: LED Replacement Lamps: Current Performance and the  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LED Replacement Lamps: Current LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® to someone by E-mail Share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Facebook Tweet about Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Twitter Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Google Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Delicious Rank Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Digg Find More places to share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®  

Broader source: Energy.gov [DOE]

This May 19, 2009 webcast summarized CALiPER's recent benchmark testing of common omnidirectional incandescent lamps (e.g., A-lamps), and provided an update on ENERGY STAR criteria for LED integral...

282

Enforcement Guidance Supplement 00-01, Enforcement Position Relative to the Discovery/Control of Legacy Contamination  

Broader source: Energy.gov (indexed) [DOE]

EGS 00-01 Appendix E - Operational Procedures for Enforcement Department of Energy Washington, DC 20585 May 4, 2000 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. On November 24, 1999, I issued a memorandum providing interim clarification on the

283

Enforcement Documents - Lawrence Livermore National Laboratory | Department  

Broader source: Energy.gov (indexed) [DOE]

Lawrence Livermore National Laboratory Lawrence Livermore National Laboratory Enforcement Documents - Lawrence Livermore National Laboratory July 22, 2013 Enforcement Letter, NEL-2013-03 Issued to Lawrence Livermore National Security, LLC related to Programmatic Deficiencies in the Software Quality Assurance Program at the Lawrence Livermore National Laboratory February 23, 2006 Preliminary Notice of Violation, University of California - EA-2006-01 Preliminary Notice of Violation issued to the University of California related to Radiological Uptakes, a Radioactive Material Spill, and Radiological Protection Program, Quality Assurance, and Safety Basis Deficiencies at the Lawrence Livermore National Laboratory June 2, 2005 Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005

284

DOE Publishes CALiPER Report on Cost-Effectiveness of Linear (T8) LED Lamps  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's CALiPER program has released Report 21.3, which is part of a series of investigations on linear LED lamps. Report 21.3 details a set of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38W total power draw) or fluorescent lamps (51W total power draw) over a 10-year study period.

285

EGS 01-01: Nuclear Weapon Program Enforcement Issues  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS:01-01 Appendix E-Operational Procedures for Enforcement Department of Energy Washington, DC 20585 October 15, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues.

286

Enforcement Policy Statement: Off Mode Standards for CAC/HP ...  

Broader source: Energy.gov (indexed) [DOE]

power consumption standard for central air conditioners or central air conditioning heat pumps (CACHP) until 180 days following publication of a final rule establishing a...

287

Requirements for a Policy-Enforceable Agent Architecture  

E-Print Network [OSTI]

and providers of goods and services, their compliance with laws governing information sharing and disclosure violations of law and achieve compliance in dynamic environments. We apply software engineering practices and obligations mediate the impact of transac- tions as either protections or vulnerabilities to consumer

Young, R. Michael

288

Filtering Postures: Local Enforcement for Global Policies Joshua D. Guttman  

E-Print Network [OSTI]

should provide a desired service, and a service that will not damage the recipient. Different mechanisms guttman@mitre.org Abstract When packet filtering is used as a security mechanism, different routers may States Army CECOM contract DAAB 07-96-C-E601. This paper appears in the Proceedings, 1997 IEEE Symposium

Guttman, Joshua

289

Action Plan for Forest Law Enforcement Governance and Trade (FLEGT) | Open  

Open Energy Info (EERE)

Plan for Forest Law Enforcement Governance and Trade (FLEGT) Plan for Forest Law Enforcement Governance and Trade (FLEGT) Jump to: navigation, search Name Action Plan for Forest Law Enforcement Governance and Trade (FLEGT) Agency/Company /Organization European Union Sector Land Focus Area Forestry Topics Policies/deployment programs Resource Type Lessons learned/best practices Website http://eur-lex.europa.eu/smart Country Belgium, Bulgaria, Czech Republic, Denmark, Germany, Estonia, Ireland, Greece, Spain, France, Italy, Cyprus, Latvia, Lithuania, Luxembourg, Hungary, Malta, Netherlands, Austria, Poland, Portugal, Romania, Slovenia, Slovakia, Slovenia, Finland, Sweden, United Kingdom Western Europe, Eastern Europe, Eastern Europe, Northern Europe, Western Europe, Northern Europe, Northern Europe, Southern Europe, Southern Europe, Western Europe, Southern Europe, Western Asia, Northern Europe, Northern Europe, Western Europe, Eastern Europe, Southern Europe, Western Europe, Western Europe, Eastern Europe, Southern Europe, Eastern Europe, Southern Europe, Eastern Europe, Southern Europe, Northern Europe, Northern Europe, Northern Europe

290

Transport phenomena in metal-halide lamps a poly-diagnostic study  

E-Print Network [OSTI]

/ spectroscopie. Subject headings: gas discharges / metal-halide lamps / plasma diagnostics / plasma properties-halide arc lamps . . . . . . . . . . . 7 1.3 Scope of ThesisTransport phenomena in metal-halide lamps a poly-diagnostic study Tanya Nimalasuriya #12;Copyright

Eindhoven, Technische Universiteit

291

LANL Enforcement Letter - 7/7/2003  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 Vice Admiral George P. Nanos [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 Subject: Los Alamos National Laboratory Enforcement Letter Dear Admiral Nanos: The Office of Price-Anderson Enforcement (OE) is concerned that nuclear safety at the Los Alamos National Laboratory (LANL/Laboratory) continues to demonstrate a negative performance trend. Our observations are based on numerous recent events involving both nuclear safety and radiological control issues. Since our last discussions at the March 2003 LANL Price-Anderson Amendments Act Enforcement Conference, my office has reviewed numerous nuclear safety and radiological events as part of enforcement action follow-up and monitoring. The events

292

Enforcement Letter -Chicago-02/24/2000  

Broader source: Energy.gov (indexed) [DOE]

4, 2000 4, 2000 Yoon I. Chang, PhD [ ] Argonne National Laboratory-East 9700 South Cass Avenue Argonne, IL 60439-4832 Subject: Enforcement Letter (NTS-CH-AA-ANLE-ANLE-1999-0009) Dear Dr. Chang: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the above referenced Noncompliance Tracking System (NTS) report describing bioassay program deficiencies at Argonne National Laboratory- East (ANL-E). This report was submitted to DOE on December 23, 1999. Approximately thirteen months previous to this NTS report's submittal, DOE's Office of Enforcement and Investigation (EH-Enforcement) issued to all DOE and contractor Price-Anderson Amendments Act coordinators a memorandum explaining EH-Enforcement's experience with and concern regarding contractor bioassay program

293

Animal Care Enforcement Actions | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Animal Care Enforcement Actions Animal Care Enforcement Actions Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Animal Care Enforcement Actions Dataset Summary Description Contains monthly reports on 7060s and stipulations related to enforcement of the Animal Welfare and Horse Protection Acts. Form 7060 - Official warning of an alleged violation of statue or regulation and notice to the subject that APHIS may seek civil or criminal penalties for alleged violation in the future if the subject again violates. Stipulation - a pre-litigation monetary settlement between APHIS and the subject. The stipulation provides the subject with notice of alleged violation, affords the subject an opportunity for an administrative hearing, and offers the subject an opportunity to waive the hearing and pay a monetary penalty calculated within Civil Penalty guidelines.

294

Nuclear Safety Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

14, 2002 14, 2002 Preliminary Notice of Violation, Fluor Hanford, Incorporated - EA-2002-03 Preliminary Notice of Violation issued to Fluor Hanford, Incorporated, related to Quality Assurance issues at the Hanford Site. June 19, 2002 Enforcement Letter, Kaiser-Hill Company, L.L.C. - June 19, 2002 Enforcement Letter issued to Kaiser-Hill Company, LLC related to Unplanned Radioactive Material Uptakes at the Rocky Flats Environmental Technology Site October 22, 2001 Special Report Order, CH2M Hill Hanford Group, Inc. - October 22, 2001 Special Report Order issued to CH2M Hill Hanford Group, Inc., related to Multiple Nuclear Safety Issues at the Hanford Site October 9, 2001 Enforcement Letter, LANL - October 9, 2001 Enforcement Letter issued to Los Alamos National Laboratory related to

295

Security Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Security Enforcement Documents Security Enforcement Documents Security Enforcement Documents Documents Available for Download May 4, 2012 Enforcement Letter, CH2M Oak Ridge, LLC - SEL-2012-01 Issued to URS CH2M Oak Ridge, LLC, related to a Security Incident involving the Protection and Control of Classified Information at the East Tennessee Technology Park April 18, 2011 Preliminary Notice, Battelle Energy Alliance, LLC, SEA-2011-01 Issued to Battelle Energy Alliance, LLC related to Classified Information Introduced into Unapproved Information Systems at the Idaho National Laboratory March 24, 2011 Settlement Agreement, Sandia Corporation - SSA-2011-01 Settlement Agreement between DOE/NNSA and Sandia Corporation for Adverse Classified Information Security Trend at Sandia National Laboratories

296

Office of Enforcement - Notices of Violation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notices of Violation Notices of Violation Office of Enforcement and Oversight 2013 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Brookhaven Science Associates, LLC, related to a Fall Injury Event that occurred in Building 701 at the Brookhaven National Laboratory, August 29, 2013 (WEA-2013-01) - Press Release 2012 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC, related to a Worker Fall from a Scaffold in the K-Area Complex at the Savannah River Site, November 9, 2012 (WEA-2012-04) - Press Release Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Los Alamos National Security, LLC, related to Four Electrical Safety-Related Events that occurred at the Los Alamos National Laboratory,

297

Prices vs. quantities with incomplete enforcement  

E-Print Network [OSTI]

This paper extends Weitzman's (1974) "Prices vs. Quantities" to allow for incomplete enforcement. Whether the regulator uses prices (e.g., taxes) or quantities (e.g., tradeable quotas), a first-best design is always ...

Montero, Juan-Pablo

1999-01-01T23:59:59.000Z

298

Safety and Security Enforcement Process Overview  

Broader source: Energy.gov (indexed) [DOE]

SAFETY AND SECURITY SAFETY AND SECURITY ENFORCEMENT PROCESS OVERVIEW August 2012 OFFICE OF ENFORCEMENT AND OVERSIGHT OFFICE OF HEALTH, SAFETY AND SECURITY U.S. DEPARTMENT OF ENERGY AUGUST 2012 DOE ENFORCEMENT PROCESS OVERVIEW PREFACE i Preface Over the years, the United States Congress has given the Secretary of Energy authority to promulgate rules to provide assurance that U.S. Department of Energy (DOE) contractors provide a workplace free from recognized hazards, that the operations of our nuclear facilities minimize potential danger to life and property, and that our classified matter is protected from disclosure in the interest of national security. Congress institutionalized these mandates through amendments to the Atomic Energy Act, and Congress also provided DOE with enforcement authority to assure compliance

299

Network Policies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Acceptable Use Policy About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Facility Data Policy Career...

300

Uni ed Support for Heterogeneous Security Policies in Distributed Systems  

E-Print Network [OSTI]

Uni ed Support for Heterogeneous Security Policies in Distributed Systems Naftaly H. Minsky in this paper a security mechanism that can support e ciently, and in a uni ed manner, a wide range of security policies are de ned formallyandexplicitly,and are enforced bya uni ed mechanism. Each policy under

Minsky, Naftaly

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Enforcing Emissions Trading when Emissions Permits are Bankable  

Science Journals Connector (OSTI)

We propose enforcement strategies for emissions trading programs with bankable emissions permits that guarantee...

John K. Stranlund; Christopher Costello…

2005-09-01T23:59:59.000Z

302

Enforcement Guidance Supplement 01-22, Management and Independent Assessment  

Broader source: Energy.gov (indexed) [DOE]

EGS: 01-02 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 17, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 01-02: Management and Independent Assessment Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no

303

Notice of Guidance on Energy Efficiency Enforcement Regulations |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Guidance on Energy Efficiency Enforcement Regulations Notice of Guidance on Energy Efficiency Enforcement Regulations Notice of Guidance on Energy Efficiency Enforcement Regulations Notice - DOE Guidance on Energy Efficiency Enforcement Regulations, Federal Register Vol. 74, No. 197 October 14, 2009. This notice sets forth the Department of Energy's (DOE's) interpretation of its energy efficiency enforcement regulations. These regulations provide for manufacturer submission of compliance statements and certification reports to DOE, maintenance of compliance records by manufacturers, and the availability of enforcement actions for improper certification or upon a determination of noncompliance. DOE also announces its intent to randomly select and review manufacturer compliance with these requirements and initiate enforcement

304

Enforcement Documents - Nevada National Security Site | Department of  

Broader source: Energy.gov (indexed) [DOE]

Nevada National Security Site Nevada National Security Site Enforcement Documents - Nevada National Security Site November 13, 2007 Enforcement Letter, National Security Technologies LLC,- November 13, 2007 Enforcement Letter issued to National Security Technologies, LLC related to an Unplanned Radiological Exposure during a Borehole Activity at the Nevada Test Site May 21, 2007 Enforcement Letter, National Security Technologies, LLC - May 21, 2007 Enforcement Letter issued to National Security Technologies, LLC related to Nuclear Safety Quality Assurance Requirements Deficiencies at the Nevada Test Site April 1, 2004 Enforcement Letter, Bechtel Nevada - April 1, 2002 Enforcement Letter issued to Bechtel Nevada related to Noncompliances with Occupational Radiation Protection and Quality Assurance Requirements at the

305

DuraLamp USA: Proposed Penalty (2010-CE-0912) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DuraLamp USA: Proposed Penalty (2010-CE-0912) DuraLamp USA: Proposed Penalty (2010-CE-0912) DuraLamp USA: Proposed Penalty (2010-CE-0912) September 9, 2010 DOE alleged in a Notice of Proposed Civil Penalty that DuraLamp USA, Inc. failed to certify a variety of general service fluorescent lamps as compliant with the applicable energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. DuraLamp USA: Proposed Penalty (2010-CE-0912) More Documents & Publications DuraLamp USA: Order (2010-CE-0912)

306

Energy-efficient compact screw-in fluorescent lamp. Final report  

SciTech Connect (OSTI)

A compact fluorescent lamp has been designed and constructed which can replace an incandescent lamp. The lamp is slightly larger than a standard lamp (8 3/4 in. x 3 1/4 in.), but is designed to fit a majority of portable lamp applications. This version, with a core-coil ballast, results in a system efficacy of 54 lumens per watt, with a light output of more than 1800 lumens. This compares favorably with a 100-watt incandescent (17.5 lumens per watt and 1750 lumens light output). The color temperature of 3000/sup 0/K is compatible with an incandescent lamp (2800/sup 0/K). The color rendition index (CRI) is 84. With a solid-state ballast, the efficacy and light output could be increased by 20% (65 l/w, 2200 lumens) and could provide a direct replacement for a three-way, 150-watt incandescent lamp (15 l/w, 2200 lumens).

Morton, E.W.

1982-11-01T23:59:59.000Z

307

Sulfur Lamps-The Next Generation of Efficient Light?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 Sulfur Lamps-The Next Generation of Efficient Light? The figure above is a schematic of the system installed at the National Air and Space Museum and the DOE headquarters in Washington, D.C., Light from the sulfur lamp is focused by a parabolic reflector so that it enters the light pipe within a small angular cone. Light travels down the pipe, reflecting off the prismatic film (A) that lines the outer acrylic tube. The prismatic film reflects the light through total internal reflection (C), an intrinsically efficient process. Some of the light striking the film (at A) is not reflected and "leaks out" of the pipe walls (B), giving the pipe a glowing appearance. A light ray that travels all the way down the pipe will strike the mirror at the end (D) and return back up the pipe.

308

L Prize Competition Winner 60W Incandesent Replacement Lamp Update  

Broader source: Energy.gov (indexed) [DOE]

Technology Deployment Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International May 23, 2012 Philips Wins First L Prize 2 * August 3, 2011: Philips announced as winner of 60W replacement bulb category * Product distributed thru commercial and retail channels Image courtesy of Philips -...[O]nce an award is made the authorizing Act directs General Services Administration to develop federal purchasing schedules for solid-state lamps that meet or exceed the specifications laid out in the prize category-so long as it is cost effective. I hope the GSA begins this process soon.‖

309

Enforcement Guidance Supplement 98-02, DOE Enforcement Activities where Off-site Transporation Issues are also Present  

Broader source: Energy.gov (indexed) [DOE]

EGS:98-02 Appendix E - Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 15, 1998 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to time with respect to the processes used in its enforcement activities. Recently several questions have arisen regarding the scope of Price-Anderson

310

ACE Learning Series - Adoption, Compliance, and Enforcement | Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resource Center Resource Center Site Map Printable Version Development Adoption Compliance Regulations Resource Center FAQs Publications Resource Guides eLearning Model Policies Glossary Related Links ACE Learning Series Utility Savings Estimators ACE Learning Series - Adoption, Compliance, and Enforcement ACE Learning Series Buildings account for almost 40% of the energy used in the United States and, as a direct result of that use, our environment and economy are impacted. Building energy codes and standards provide an effective response. The Building Energy Codes Program (BECP) designed the ACE Learning Series for those in the building industry having the greatest potential to influence the adoption of and compliance with building energy codes and standards. The Learning Series consists of:

311

ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts  

Broader source: Energy.gov [DOE]

Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

312

Enforcement Documents - Pantex Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pantex Plant Pantex Plant Enforcement Documents - Pantex Plant January 7, 2013 Enforcement Letter, NEL-2013-01 Issued to B&W Pantex, LLC related to the Conduct of Nuclear Explosive Operations at the Pantex Plant November 21, 2006 Preliminary Notice of Violation, BWXT Pantex, LLC - EA-2006-04 Issued to BWXT Pantex, LLC, related to Quality Assurance and Safety Basis Requirements Violations at the Pantex Plant May 16, 2005 Preliminary Notice of Violation, BWXT Pantex LLC - EA-2005-02 Preliminary Notice of Violation issued to BWXT Pantex LLC, related to High Explosive Cracking during Weapon Disassembly at the Pantex Plant June 21, 2000 Consent Order, Mason & Hanger Corporation - EA-2000-07 Price-Anderson Enforcement Consent Order issued to Mason & Hanger Corporation related to Fire Suppression System Issues at the Pantex Plant,

313

Enforcement Guidance Supplement - EGS 99-03  

Broader source: Energy.gov (indexed) [DOE]

for Enforcement Department of Energy Washington DC 20585 October 20, 1999 MEMORANDUM FOR: DOE and Contractor PAAA Coordinators FROM: R. Keith Christopher Director Office of Enforcement and Investigation SUBJECT: Enforcement Guidance Supplement 99-03: Limitation of 10 CFR Part 830 to Equipment Referenced in the Safety Analysis Report Recently this Office received a reply to a Preliminary Notice of Violation (PNOV), although not denying any facts or conclusions in the PNOV and agreeing to pay the full imposed Civil Penalty, included arguments that some of the equipment cited in the PNOV was not, in their view, subject to the requirements of Part 830. The contractor argued that only equipment referenced in the Safety Analysis Report (SAR), Technical

314

Office of River Protection (Hanford) - Enforcement Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Documents Enforcement Documents Office of River Protection (Hanford) Enforcement Letter issued to Washington River Protection Solutions, LLC, related to a positive Unreviewed Safety Question involving the Tank Farm Waste Transfer System at the Hanford Site, (NEL-2012-01) February 28, 2012 Consent Order issued to Washington River Protection Solutions, LLC related to deficiencies in the corrective action management program, radiation control program, and sealed radioactive source accountability and control program (NCO-2011-01) May 27, 2011 Consent Order issued to Bechtel National, Inc. for Deficiencies in Vendor Commercial Grade Dedication Processes at the Hanford Waste Treatment and Immobilization Plant Project (NCO-2010-03) September 22, 2010 Preliminary Notice of Violation issued to Bechtel National, Inc., related to Deficiencies at the Waste Treatment and Immobilization Plant at the Hanford Site, December 3, 2008 (NEA-2008-04)

315

Enforcement Documents - Pacific Northwest National Laboratory | Department  

Broader source: Energy.gov (indexed) [DOE]

Pacific Northwest National Laboratory Pacific Northwest National Laboratory Enforcement Documents - Pacific Northwest National Laboratory January 8, 2008 Preliminary Notice of Violation,Battelle Memorial Institute - EA-2007-07 Preliminary Notice of Violation issued to Battelle Memorial Institute related to Radiological Events and the Independent Assessment Program at the Pacific Northwest National Laboratory May 5, 2004 Enforcement Letter, Battelle Memorial Institute - May 5, 2004 Enforcement Letter issued to Battelle Memorial Institute related to Radiological Work Practices at the Pacific Northwest National Laboratory April 3, 1996 Preliminary Notice of Violation, Pacific Northwest National Laboratory - EA-96-01 Preliminary Notice of Violation issued to Battelle related to the Delayed Response to a Criticality Safety Alarm at the Pacific Northwest National

316

Enforcement Action - EA-2003-02  

Broader source: Energy.gov (indexed) [DOE]

April 10, 2003 April 10, 2003 Vice Admiral George P. Nanos [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 EA-2003-02 Subject: Preliminary Notice of Violation and Proposed Civil Penalty $385,000 (Waived by Statute) Dear Admiral Nanos: This letter refers to the recent investigation by the Department of Energy's Office of Enforcement (OE) of the March 13, 2002, [ ] contamination event, the September 26, 2002, [ ] radiography event and safety basis (SB) issues at [ ], [ ], and [ ]. An Investigation Summary Report describing the results of that review was issued to you on January 30, 2003. An Enforcement Conference was held on March 4-5, 2003, in

317

Price-Anderson Nuclear Safety Enforcement Program. 1996 Annual report  

SciTech Connect (OSTI)

This first annual report on DOE`s Price Anderson Amendments Act enforcement program covers the activities, accomplishments, and planning for calendar year 1996. It also includes the infrastructure development activities of 1995. It encompasses the activities of the headquarters` Office of Enforcement in the Office of Environment, Safety and Health (EH) and Investigation and the coordinators and technical advisors in DOE`s Field and Program Offices and other EH Offices. This report includes an overview of the enforcement program; noncompliances, investigations, and enforcement actions; summary of significant enforcement actions; examples where enforcement action was deferred; and changes and improvements to the program.

NONE

1996-01-01T23:59:59.000Z

318

Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. On November 24, 1999, I issued a memorandum providing interim clarification on the EH-Enforcement position on legacy radioactive contamination. That memorandum was issued in response to questions I had received regarding 10 CFR 835 (Occupational Radiation Protection) applicability and potential enforcement related to the discovery of legacy contamination in unposted and/or uncontrolled areas. This Enforcement Guidance Supplement (EGS) provides more detail related to specific 10 CFR 835 requirements and applicability of those requirements. This EGS also discusses EH-Enforcement's planned level of enforcement discretion associated with legacy contamination incidents, as well as the limitations to the application of that discretion.

319

Enforcement Guidance Supplement 00-01: Enforcement Position Relative to the Discovery/Control of Legacy Contamination  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. On November 24, 1999, I issued a memorandum providing interim clarification on the EH-Enforcement position on legacy radioactive contamination. That memorandum was issued in response to questions I had received regarding 10 CFR 835 (Occupational Radiation Protection) applicability and potential enforcement related to the discovery of legacy contamination in unposted and/or uncontrolled areas. This Enforcement Guidance Supplement (EGS) provides more detail related to specific 10 CFR 835 requirements and applicability of those requirements. This EGS also discusses EH-Enforcement’s planned level of enforcement discretion associated with legacy contamination incidents, as well as the limitations to the application of that discretion.

320

NETL: Privacy Policy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Policy Privacy Policy Privacy Policy National Energy Technology Laboratory strives to protect the privacy of website visitors. Information collected is strictly limited to the following: Information Collected and Stored Automatically The IP address, a number that is automatically assigned to each computer that connects to the World Wide Web; Date and time of website access; Pages browsed. NETL reviews this information in an effort to make the website more useful and informative. This information is used solely as a source of anonymous statistical information; NETL does not track or record information about individuals or their visits. This information is NOT shared with anyone beyond NETL website home page staff, except when required by law enforcement investigation.

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Photovoltaic experiment using light from a solar simulator lamp  

Science Journals Connector (OSTI)

A photovoltaic cellexperiment utilizing the convenience of a solar simulating type lamp is described. The circuit for obtaining the cell characteristic drives an X?Y plotter to graph continuously the characteristics from short circuit current to the open circuit voltage. Calibration methods and their limitation are discussed for estimating the irradiance to determine the light conversion efficiency of the cell. The diode junction nature of the cell is clearly supported by the agreement between experiment and theory. The experiment should be exceptionally suitable for an undergraduate physics laboratory experiment.

R. H. Chow

1980-01-01T23:59:59.000Z

322

Lumen and Chromaticity Maintenance of LED PAR38 Lamps Operated in Steady-State Conditions  

SciTech Connect (OSTI)

The lumen depreciation and color shift of 38 different lamps (32 LED, 2 CFL, 1 ceramic metal halide [CMH], 3 halogen) were monitored in a specially developed automated long-term test apparatus (ALTA2) for nearly 14,000 hours. Five samples of each lamp model were tested, with measurements recorded on a weekly basis. The lamps were operated continuously at a target ambient temperature between 44°C and 45°C.

Royer, Michael P.

2014-12-01T23:59:59.000Z

323

Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d)  

Broader source: Energy.gov (indexed) [DOE]

5, 1998 5, 1998 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 98-01: Duration of Investigations Conducted Pursuant to 10 CFR 820.21; Purpose of Transcript Requirements Set Forth in 10 CFR 820.10 (d) The DOE Enforcement Handbook (1087-95) provides the Office of Enforcement and Investigation with the opportunity to issue interim clarifying guidance occasionally with respect to the processes to be used in this office (see Section 1.3- Interim Enforcement Guidance). In particular, it is important to assist contractors and others on the relationships between the requirements of Part 820 and the Enforcement Policy, 10 CFR 820, Appendix A.

324

DOE Office of Enforcement Continues Aggressive Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

DOE Office of Enforcement Continues Aggressive Energy Efficiency DOE Office of Enforcement Continues Aggressive Energy Efficiency Enforcement Effort with 20 New Proposed Penalty Notices DOE Office of Enforcement Continues Aggressive Energy Efficiency Enforcement Effort with 20 New Proposed Penalty Notices May 2, 2011 - 5:06pm Addthis Demonstrating its continuing commitment to rigorous enforcement of important federal efficiency requirements, the Department of Energy's Office of Enforcement today announced 20 new enforcement cases. These cases are against companies that the Department has reason to believe are selling products in the United States without certifying that their products comply with energy efficiency or water conservation standards. The legally required certifications help ensure that products sold in the

325

2014-07-08 Issuance: ASRAC Regional Enforcement Working Group...  

Broader source: Energy.gov (indexed) [DOE]

7-08 Issuance: ASRAC Regional Enforcement Working Group; Notice of Membership 2014-07-08 Issuance: ASRAC Regional Enforcement Working Group; Notice of Membership This document is a...

326

Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning...  

Broader source: Energy.gov (indexed) [DOE]

for Issuing Consent Orders Pursuant to 10 CFR 820.23 In October 2000, the Office of Price-Anderson Enforcement (OE) issued Enforcement Guidance Supplement (EGS) 00-04, "Factual...

327

Department of Energy Initiates Formal Enforcement Action in Los...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

details on this and other departmental enforcement actions at the Office of Enforcement. Media contact(s): Megan Barnett, DOE, (202) 586-4940 Julianne Smith, NNSA, (202) 586-7371...

328

Support for ENERGY STAR Enforcement | Department of Energy  

Energy Savers [EERE]

Support for ENERGY STAR Enforcement Support for ENERGY STAR Enforcement By offering a means for consumers to buy products more energy-efficient than required by law, ENERGY STAR...

329

DOE Office of Enforcement Continues Aggressive Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

DOE Office of Enforcement Continues Aggressive Energy Efficiency DOE Office of Enforcement Continues Aggressive Energy Efficiency Enforcement Effort with 20 New Proposed Penalty Notices DOE Office of Enforcement Continues Aggressive Energy Efficiency Enforcement Effort with 20 New Proposed Penalty Notices May 2, 2011 - 5:06pm Addthis Demonstrating its continuing commitment to rigorous enforcement of important federal efficiency requirements, the Department of Energy's Office of Enforcement today announced 20 new enforcement cases. These cases are against companies that the Department has reason to believe are selling products in the United States without certifying that their products comply with energy efficiency or water conservation standards. The legally required certifications help ensure that products sold in the

330

Text-Alternative Version: CALiPER Series 21 on LED Linear Lamps and Troffer Lighting  

Broader source: Energy.gov [DOE]

Following is a text version of a video about CALiPER Application Report Series 21 on LED Linear Lamps and Troffer Lighting.

331

Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

332

DOE Publishes Special CALiPER Report on Retail Lamps | Department...  

Broader source: Energy.gov (indexed) [DOE]

retail marketplace and targeted toward general consumers. The report follows similar reports published in 2011 and 2012. LED replacement lamps are available through many retail...

333

LED Linear Lamps and Troffer Lighting: CALiPER Report Series 21  

SciTech Connect (OSTI)

Video about CALiPER Report Series 21 on LED Linear Lamps and Troffer Lighting, featuring interviews with Tracy Beeson and Naomi Miller of Pacific Northwest National Laboratory.

Beeson, Tracy; Miller, Naomi

2014-06-17T23:59:59.000Z

334

The effects of supply harmonics on the performance of compact fluorescent lamps  

SciTech Connect (OSTI)

This paper describes a performance evaluation of ten compact fluorescent lighting systems operated with sinusoidal and distorted voltage waveform conditions. The lamps were either provided with an electronic ballast, a magnetic core ballast or a magnetic core ballast with a power factor correction circuit. The test results show that the electrical performance of the compact fluorescent lamps for both sinusoidal and distorted voltage waveform operation is related to the different types of ballast used. The cost of operation of these compact fluorescent lamps was calculated and compared to the cost of a conventional 60 W incandescent lamp.

Arseneau, R.; Ouellette, M.

1993-04-01T23:59:59.000Z

335

EA-1911: Energy Conservation Standards for Certain Reflector, Elliptical Reflector, and Bulged Reflector Incandescent Lamps  

Broader source: Energy.gov [DOE]

This EA will evaluate the environmental impacts of a proposal to amend energy conservation standards for Certain Reflector, Elliptical Reflector, and Bulged Reflector Incandescent Lamps.

336

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to...

337

Fraud Policy Governance Policy  

E-Print Network [OSTI]

Fraud Policy Governance Policy © Victoria University of Wellington Page 1 1 Purpose The purpose of this policy is to address the risk of fraud and to lay out the actions the University will take when any suspected fraud is reported or discovered and should be read in conjunction with the Student Conduct Statute

Frean, Marcus

338

OFFICIAL POLICY Ethics Policy  

E-Print Network [OSTI]

OFFICIAL POLICY Ethics Policy 1.0 PREFACE It is the intent of this Ethics Policy to state those standards of ethical conduct that are expected of all members of the College Community. These standards must the minimum standards of ethical conduct that are required by South Carolina law and reflect the aspirations

Kasman, Alex

339

Policy-driven memory protection for reconfigurable hardware  

Science Journals Connector (OSTI)

While processor based systems often enforce memory protection to prevent the unintended sharing of data between processes, current systems built around reconfigurable hardware typically offer no such protection. Several reconfigurable cores are often ... Keywords: computer security, embedded systems, policy languages, reference monitors, security policies, separation kernels

Ted Huffmire; Shreyas Prasad; Tim Sherwood; Ryan Kastner

2006-09-01T23:59:59.000Z

340

J.-A. FLEMING. 2014 On the characteristic curves and surfaces of incandescence lamps (Courbes caractristiques des lampes incandescence) ; Phil. Mag.,  

E-Print Network [OSTI]

80 J.-A. FLEMING. 2014 On the characteristic curves and surfaces of incandescence lamps (Courbes caractéristiques des lampes à incandescence) ; Phil. Mag., 5e série, t. XIX, p. 368; I885. L'auteur étudie les résistance correspondant à la force électromotrice vo à laquelle l'incandescence commence à se produire, et r

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Framework for SCADA Security Policy (October 2005) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Framework for SCADA Security Policy (October 2005) Framework for SCADA Security Policy (October 2005) Framework for SCADA Security Policy (October 2005) Modern automation systems used in infrastruc-ture (including Supervisory Control and Data Acquisition, or SCADA) have myriad security vulnerabilities. Many of these relate directly to inadequate security administration, which precludes truly effective and sustainable security. Adequate security management mandates a clear administrative struc-ture and enforcement hierarchy. The security policy is the root document, with sections covering purpose, scope, posi-tions, responsibilities, references, revision history, enforce-ment, and exceptions for various subjects relevant for system security. It covers topics including the overall security risk management program, data security, platforms,

342

Enforcement Action - EA-2004-05  

Broader source: Energy.gov (indexed) [DOE]

21, 2004 21, 2004 Vice Admiral George P. Nanos [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 EA-2004-05 Subject: Preliminary Notice of Violation and Proposed Civil Penalty $770,000 (Waived by Statute) Dear Admiral Nanos: This letter refers to the investigation by the Department of Energy's Office of Price-Anderson Enforcement (OE) of the August 5, 2003, [ ] multiple [ ] uptake event, the September 27, 2003, [ ] five worker exposure to toxic vapors, and programmatic issues in the radiological protection program at the Los Alamos National Laboratory (LANL). An Investigation Summary Report describing the results of that review was issued to you on March 23, 2004. An Enforcement Conference was held on April 13-14, 2004, in

343

Enforcement Action - EA-2006-01  

Broader source: Energy.gov (indexed) [DOE]

23, 2006 23, 2006 OFFICE OF THE ADMINISTRATOR Dr. Michael R. Anastasio, Director Lawrence Livermore National Laboratory P.O. Box 808, L-001 Livermore, CA 94550 EA-2006-01 Subject: Preliminary Notice of Violation and Proposed Civil Penalty of $588,500 (Waived by Statute) Dear Dr: Anastasio: This letter refers to the Department of Energy (DOE) Office of Price-Anderson Enforcement's (OE) investigation of the August 2004 MOVER radiological uptakes and the April 2005 Phosphorous Spill Event, as well as longstanding Radiological Protection Program, Quality Assurance, and Safety Basis deficiencies. An Investigation Summary Report describing the results of that review was issued to you on August 30, 2005. An Enforcement Conference was held on October 5, 2005, in Germantown, Maryland, with

344

Enforcement Action - EA-2005-03  

Broader source: Energy.gov (indexed) [DOE]

4, 2005 4, 2005 Mr. Christopher P. Leichtweis President and Chief Executive Officer Safety and Ecology Corporation SEC Business Center 2800 Solway Road Knoxville, TN 37931 EA-2005-03 Subject: Preliminary Notice of Violation and Proposed Civil Penalty- $55,000 Dear Mr. Leichtweis: This letter refers to the recent investigation by the Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) involving a contractor employee protection issue at the Portsmouth site. 10 CFR 708, "DOE Contractor Employee Protection Program," has been designated a nuclear safety regulation by DOE and, thus, it is enforceable under the Price-Anderson Amendments Act [See 64 FR 12861,12863 (1999)]. Pursuant to the structure of the regulation, a finding of contractor retaliation against an

345

Enforcement Action EA-2005-04  

Broader source: Energy.gov (indexed) [DOE]

4, 2005 4, 2005 Mr. Michael C. Hughes President and General Manager Bechtel Jacobs Company, L.L.C. Building K-1225/MS-7294/RM 107 P.O. Box 4699 East Tennessee Technology Park Oak Ridge, TN 37831-7294 EA-2005-04 Subject: Preliminary Notice of Violation and Proposed Civil Penalty - $247,500 Dear Mr. Hughes: This letter refers to the recent investigation by the Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) of the May 2004 New Hydrofracture Facility (NHF) transportation event and the August 2004 personnel contamination event at the Hot Storage Garden (HSG) Facility. An Investigation Summary Report describing the results of the OE review was issued to you on May 17, 2005. An Enforcement Conference was held on June 13, 2005, in Germantown, Maryland, with you and

346

Enforcement Action EA-2004-04  

Broader source: Energy.gov (indexed) [DOE]

7, 2004 7, 2004 Mr. Dennis R. Ruddy [ ] BWXT Y-12 P.O. Box 2009 MS 8001 Oak Ridge, TN 37831-8001 EA 2004-04 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty $82,500. Dear Mr. Ruddy: This letter refers to the recent investigation by the Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) of the April 2003 explosion event involving the Saltless Direct Oxide Reduction (SDOR) process, as well as continuing problems associated with Safety Basis compliance at the Y-12 site . An Investigation Summary Report describing the results of that review was issued to BWXT Y-12 on December 22, 2003. An Enforcement Conference was held on January 22, 2004, in Germantown, Maryland, with members of your staff and you to discuss

347

Oak Ridge National Laboratory (ORNL) Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

31, 2002 31, 2002 Dr. William J. Madia [ ] Oak Ridge National Laboratory P.O. Box 2008 Oak Ridge, TN 37831-6255 Subject: Oak Ridge National Laboratory (ORNL) Enforcement Letter Dear Dr. Madia: The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS- ORO--ORNL-X10PHYSICS-2002-0001. Our evaluation included review of the investigation report, associated corrective action plan, and discussion with site personnel. The subject NTS report described a series of deficiencies that resulted in several personnel being exposed to unanticipated radiation fields during the startup testing of an electron cyclotron resonance (ECR) source at the [facility]. The exposures occurred

348

Nuclear Safety Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 13, 2008 June 13, 2008 Preliminary Notice of Violation, Babcock & Wilcox Teclmical Services Y-12, LLC - NEA-2008-01 Preliminary Notice of Violation issued to Babcock & Wilcox Technical Services Y-12, LLC, related to a Uranium Chip Fire at the Y-12 National Security Complex March 17, 2008 Enforcement Letter , Bechtel BWXT Idaho LLC - March 17, 2008 Enforcement Letter issued to Bechtel BWXT Idaho, LLC, related to Procedural Adequacy and Adherence in Transuranic Waste Characterization and Shipping at the Idaho National Laboratory January 4, 2008 Special Report Order, Los Alamos National Security, LLC - January 4, 2008 Issued to Los Alamos National Security, LLC related to Glovebox Activities at TA-55 and Chemistry and Metallurgy Research Facilities at the Los Alamos

349

Spatial and time-dependent distribution of plasma parameters in the metal-halide arc lamp.  

E-Print Network [OSTI]

Spatial and time-dependent distribution of plasma parameters in the metal-halide arc lamp. A. Khakhaev, L. Luizova, K. Ekimov and A. Soloviev Petrozavodsk State University, Russia The metal-halide arc lamp is an effective light source and its investigation has a long history, but even at present some

Paris-Sud XI, Université de

350

Demonstration Of A Monitoring Lamp To Visualize The Energy Consumption In Houses  

E-Print Network [OSTI]

Demonstration Of A Monitoring Lamp To Visualize The Energy Consumption In Houses Christophe Gisler1://www.unipg.it Abstract. We report on the development of a wireless lamp dedicated to the feedback of energy consumption is a good solution to make people gain awareness of their energy consumption and hence reduce it [1

Paris-Sud XI, Université de

351

Spectral irradiance model for tungsten halogen lamps in 340-850 nm wavelength range  

SciTech Connect (OSTI)

We have developed a physical model for the spectral irradiance of 1 kW tungsten halogen incandescent lamps for the wavelength range 340-850 nm. The model consists of the Planck's radiation law, published values for the emissivity of tungsten, and a residual spectral correction function taking into account unknown factors of the lamp. The correction function was determined by measuring the spectra of a 1000 W, quartz-halogen, tungsten coiled filament (FEL) lamp at different temperatures. The new model was tested with lamps of types FEL and 1000 W, 120 V quartz halogen (DXW). Comparisons with measurements of two national standards laboratories indicate that the model can account for the spectral irradiance values of lamps with an agreement better than 1% throughout the spectral region studied. We further demonstrate that the spectral irradiance of a lamp can be predicted with an expanded uncertainty of 2.6% if the color temperature and illuminance values for the lamp are known with expanded uncertainties of 20 K and 2%, respectively. In addition, it is suggested that the spectral irradiance may be derived from resistance measurements of the filament with lamp on and off.

Ojanen, Maija; Kaerhae, Petri; Ikonen, Erkki

2010-02-10T23:59:59.000Z

352

CALiPER Report 20.3: Robustness of LED PAR38 Lamps  

SciTech Connect (OSTI)

Three samples of 40 of the Series 20 PAR38 lamps underwent multi-stress testing, whereby samples were subjected to increasing levels of simultaneous thermal, humidity, electrical, and vibrational stress. The results do not explicitly predict expected lifetime or reliability, but they can be compared with one another, as well as with benchmark conventional products, to assess the relative robustness of the product designs. On average, the 32 LED lamp models tested were substantially more robust than the conventional benchmark lamps. As with other performance attributes, however, there was great variability in the robustness and design maturity of the LED lamps. Several LED lamp samples failed within the first one or two levels of the ten-level stress plan, while all three samples of some lamp models completed all ten levels. One potential area of improvement is design maturity, given that more than 25% of the lamp models demonstrated a difference in failure level for the three samples that was greater than or equal to the maximum for the benchmarks. At the same time, the fact that nearly 75% of the lamp models exhibited better design maturity than the benchmarks is noteworthy, given the relative stage of development for the technology.

Poplawski, Michael E.; Royer, Michael P.; Brown, Charles C.

2014-12-31T23:59:59.000Z

353

Table lamp with dynamically controlled lighting distribution and uniformly illuminated luminous shade  

DOE Patents [OSTI]

A double lamp table or floor lamp lighting system has a pair of compact fluorescent lamps (CFLs) or other lamps arranged vertically, i.e. one lamp above the other, with a reflective septum in between. By selectively turning on one or both of the CFLs, down lighting, up lighting, or both up and down lighting is produced. The control system can also vary the light intensity from each CFL. The reflective septum ensures that almost all the light produced by each lamp will be directed into the desired light distribution pattern which is selected and easily changed by the user. In a particular configuration, the reflective septum is bowl shaped, with the upper CFL sitting in the bowl, and a luminous shade hanging down from the bowl. The lower CFL provides both task lighting and uniform shade luminance. Planar compact fluorescent lamps, e.g. circular CFLs, particularly oriented horizontally, are preferable. CFLs provide energy efficiency. However, other types of lamps, including incandescent, halogen, and LEDs can also be used in the fixture. The lighting system may be designed for the home, hospitality, office or other environments.

Siminovitch, Michael J. (Pinole, CA); Page, Erik R. (Berkeley, CA)

2002-01-01T23:59:59.000Z

354

The evolving price of household LED lamps: Recent trends and historical comparisons for the US market  

SciTech Connect (OSTI)

In recent years, household LED light bulbs (LED A lamps) have undergone a dramatic price decline. Since late 2011, we have been collecting data, on a weekly basis, for retail offerings of LED A lamps on the Internet. The resulting data set allows us to track the recent price decline in detail. LED A lamp prices declined roughly exponentially with time in 2011-2014, with decline rates of 28percent to 44percent per year depending on lumen output, and with higher-lumen lamps exhibiting more rapid price declines. By combining the Internet price data with publicly available lamp shipments indices for the US market, it is also possible to correlate LED A lamp prices against cumulative production, yielding an experience curve for LED A lamps. In 2012-2013, LED A lamp prices declined by 20-25percent for each doubling in cumulative shipments. Similar analysis of historical data for other lighting technologies reveals that LED prices have fallen significantly more rapidly with cumulative production than did their technological predecessors, which exhibited a historical decline of 14-15percent per doubling of production.

Gerke, Brian F.; Ngo, Allison T.; Alstone, Andrea L.; Fisseha, Kibret S.

2014-10-14T23:59:59.000Z

355

Performance of "Ultra-High" Efficient Electronic Ballast for HID Lamps  

E-Print Network [OSTI]

. Index Terms--Electronic ballast, HID lamps, resonant inverter, power loss modeling, Silicon Carbide (Si of >95% for the ballast. Diode bridge rectifier EMI filter Resonant Inverter Power Factor Correction 75423, USA Abstract--A new electronic ballast circuit for High Intensity Discharge (HID) lamps

Tolbert, Leon M.

356

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present  

Broader source: Energy.gov (indexed) [DOE]

December 15, 1998 December 15, 1998 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present. Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to time with respect to the processes used in its enforcement activities. Recently several questions have arisen regarding the scope of Price-Anderson enforcement when transportation issues are directly or indirectly involved in an incident. These questions can be separated into two areas,

357

Administration Policy Complete Policy Title  

E-Print Network [OSTI]

Administration Policy Complete Policy Title: McMaster University Alcohol Policy Policy Number, 1998 Supersedes/Amends Policy dated: May 11, 1998 Responsible Executive: Vice-President (Administration policy and the written copy held by the policy owner, the written copy prevails. INTRODUCTION Mc

Haykin, Simon

358

Pre-execution Security Policy Assessment of Remotely Defined BPEL-Based Grid Processes  

Science Journals Connector (OSTI)

In this paper results from research on security policy enforcement for cross-domain defined business ... in BPEL are transferred to the field of Grid computing, where BPEL is used to define Grid processes. In ord...

Klaus-Peter Fischer; Udo Bleimann…

2007-01-01T23:59:59.000Z

359

190 IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL. 30, NO. 1, FEBRUARY 2002 Gap Closure in a Cold Metal Halide Lamp  

E-Print Network [OSTI]

lamp has been investigated using a two-dimensional, plasma transport model. Im- ages are presented- charge devices, lighting, plasma applications. METAL halide high-intensity-discharge (HID) lamps op- erate as high-pressure thermal arcs [1]. The cold fills of HID lamps are typically 50­100 torr of a rare

Kushner, Mark

360

Compliance Certification Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 22, 2011 April 22, 2011 Topstar: Proposed Penalty (2011-CE-2703) DOE alleged in a Notice of Proposed Civil Penalty that Topstar International, Inc. failed to certify a variety of incandescent reflector lamps as compliant with the applicable energy conservation standards. April 22, 2011 Living Direct: Proposed Penalty (2011-CE-1904) DOE alleged in a Notice of Proposed Civil Penalty that Living Direct, Inc. failed to certify a variety of dishwashers, refrigerator-freezers, and freezers as compliant with the applicable energy conservation standards. April 22, 2011 Midea Washing Appliance: Proposed Penalty (2011-CE-1903) DOE alleged in a Notice of Proposed Civil Penalty that Midea Washing Appliances Mfg. Co., Ltd. failed to certify a variety of dishwashers as compliant with the applicable water and energy conservation standards.

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Compliance Certification Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 6, 2010 October 6, 2010 Averen: Order (2010-CW-0711) DOE ordered Averen, Inc. to pay a $5,000 civil penalty after finding Averen had failed to certify that certain models of faucets comply with the applicable water conservation standards. October 5, 2010 American Power: Order (2010-CE-0911) DOE issued an Order and entered into a Compromise Agreement with American Power Solutions, Inc. for failure to certify that general service flurorescent lamp model T8 complies with the energy conservation standards. October 5, 2010 Felix Storch: Order (2010-CE-03/04/0613) DOE ordered Felix Storch, Inc. to pay a $5,000 civil penalty after finding Felix Storch had failed to certify that basic model DW 2432, a dishwasher, complies with the applicable energy conservation standards.

362

Conservation Standards Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 20, 2012 November 20, 2012 Teddico: Noncompliance Determination (2012-SE-5409) DOE issued a Notice of Noncompliance Determination to The Electrical Design, Development and Implementation Company d/b/a Teddico finding that a variety of basic models of magnetic probe-start metal halide lamp fixtures do not comport with the energy conservation standards. November 19, 2012 Hydac: Noncompliance Determination (2012-SE-4107) DOE issued a Notice of Noncompliance Determination to Hydac Technology Corporation finding that a variety of electric motor basic models do not comport with the energy conservation standards. November 7, 2012 YMGI: Order (2011-SCE-1605) DOE ordered YMGI Group LLC to pay a $31,400 civil penalty after finding (1) YMGI had failed to certify that certain models of residential central air

363

CALiPER Report 21.3: Cost-Effectiveness of Linear (T8) LED Lamps  

SciTech Connect (OSTI)

Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15 minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.

Miller, Naomi J.; Perrin, Tess E.; Royer, Michael P.

2014-05-27T23:59:59.000Z

364

Alternative Fuels Data Center: Vehicle Idling Policy Requirements  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Idling Policy Vehicle Idling Policy Requirements to someone by E-mail Share Alternative Fuels Data Center: Vehicle Idling Policy Requirements on Facebook Tweet about Alternative Fuels Data Center: Vehicle Idling Policy Requirements on Twitter Bookmark Alternative Fuels Data Center: Vehicle Idling Policy Requirements on Google Bookmark Alternative Fuels Data Center: Vehicle Idling Policy Requirements on Delicious Rank Alternative Fuels Data Center: Vehicle Idling Policy Requirements on Digg Find More places to share Alternative Fuels Data Center: Vehicle Idling Policy Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Vehicle Idling Policy Requirements Schools must adopt and enforce a written policy to address idling vehicles

365

DOE Resolves Nearly All of its September 2010 Certification Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Resolves Nearly All of its September 2010 Certification Resolves Nearly All of its September 2010 Certification Enforcement Actions DOE Resolves Nearly All of its September 2010 Certification Enforcement Actions October 19, 2010 - 10:39am Addthis The Energy Department's new Office of Enforcement, part of the General Counsel's Office, announced today that it has now successfully resolved 26 of the 30 certification enforcement cases brought in September 2010 as part of the Department's ongoing enforcement initiative. The Department will continue aggressively enforcing its certification requirements, which generate information that allows the Department to verify if a company is complying with energy and water efficiency standards that deliver significant energy, water, and cost savings to the American public.

366

DOE Resolves Nearly All of its September 2010 Certification Enforcement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resolves Nearly All of its September 2010 Certification Resolves Nearly All of its September 2010 Certification Enforcement Actions DOE Resolves Nearly All of its September 2010 Certification Enforcement Actions October 19, 2010 - 10:39am Addthis The Energy Department's new Office of Enforcement, part of the General Counsel's Office, announced today that it has now successfully resolved 26 of the 30 certification enforcement cases brought in September 2010 as part of the Department's ongoing enforcement initiative. The Department will continue aggressively enforcing its certification requirements, which generate information that allows the Department to verify if a company is complying with energy and water efficiency standards that deliver significant energy, water, and cost savings to the American public.

367

DOE Withdraws Interpretive Rule and Provides Enforcement Guidance on  

Broader source: Energy.gov (indexed) [DOE]

Interpretive Rule and Provides Enforcement Guidance Interpretive Rule and Provides Enforcement Guidance on Showerheads DOE Withdraws Interpretive Rule and Provides Enforcement Guidance on Showerheads March 4, 2011 - 5:27pm Addthis The Department has withdrawn as unwarranted the draft interpretative rule setting out the Department's views on the definition of a "showerhead" for purposes of the water conservation standard enacted by Congress in 1992. To provide certainty going forward, however, the Department today provides a brief enforcement guidance, which balances the Department's obligation to enforce the congressional standard with its determination to avoid needless economic dislocation. The guidance, available here, explains how the Department intends to enforce the 1992 law and provides manufacturers a

368

Office of Enforcement and Oversight | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Office of Enforcement and Oversight Office of Enforcement and Oversight Office of Enforcement and Oversight The Atomic Energy Act of 1954 authorizes the Department of Energy (DOE) to be self-regulating with respect to the safety and security of the DOE workforce, protection of the public from Departmental operations, and the protection of national security assets. The Office of Health, Safety and Security's (HSS) Office of Enforcement and Oversight fulfills two key elements of DOE's overall approach to ensuring effective self-regulation and providing assurance of the Department's safety and security posture to its leadership, its workers, and the public - regulatory enforcement and independent oversight. The Office of Enforcement and Oversight was created in May 2011 by merging two former HSS offices; the Office of Independent Oversight and the Office

369

ACE Learning Series - Enforcement Toolkit | Building Energy Codes Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enforcement Toolkit Enforcement Toolkit The U.S. Department of Energy's (DOE's) Building Energy Codes Program (BECP) developed this toolkit to help the enforcement community achieve higher levels of compliance with building energy codes. Although this toolkit is not intended for use by designers, developers, home owners or renters, building owners, or building operators, it may provide those individuals some insight into the issues facing the enforcement community. Publication Date: Saturday, September 1, 2012 EnforcementToolkit.pdf Document Details Document Number: PNNL-SA-90467 Prepared by: prepared by Pacific Northwest National Laboratory for the U.S. Department of Energy Building Energy Codes Program Focus: Enforcement Document type: Other Target Audience: Advocate Architect/Designer

370

Enforcement Letter, LANL - July 7, 2003 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 7, 2003 July 7, 2003 Enforcement Letter, LANL - July 7, 2003 July 7, 2003 Enforcement Letter issued to Los Alamos National Laboratory related to Negative Performance Trends The Office of Price-Anderson Enforcement (OE) is concerned that nuclear safety at the Los Alamos National Laboratory (LANL/Laboratory) continues to demonstrate a negative performance trend. Our observations are based on numerous recent events involving both nuclear safety and radiological control issues. Since our last discussions at the March 2003 LANL Price-Anderson Amendments Act Enforcement Conference, my office has reviewed numerous nuclear safety and radiological events as part of enforcement action follow-up and monitoring. Enforcement Letter, LANL - July 7, 2003 More Documents & Publications

371

Enforcement Action - EA 2004-07  

Broader source: Energy.gov (indexed) [DOE]

4 4 Mr. Woodrow B. Jameson [ ] Fluor Fernald Inc. P.O. Box 538704 Cincinnati, Ohio 45253-8704 EA 2004-07 Subject: Preliminary Notice of Violation for Deficiencies Related to the Control of Respirators at the Waste Pit Project Dear Mr. Jameson: This letter refers to the Department of Energy's (DOE) Office of Price- Anderson Enforcement's (OE) recent review of programmatic failures involving the use of respiratory protection at the Waste Pit Project (WPP). Our review identified that specific noncompliances under 10 CFR 830, Subpart A, "Quality Assurance Requirements," and 10 CFR 835 "Occupational Radiation Protection" have occurred as described in the attached Preliminary Notice of Violation (PNOV).

372

US statutes for enforcement by security inspectors  

SciTech Connect (OSTI)

This document is one of a three volume set. BNL 52201 is titled `Selected Text of Atomic Energy Act Executive Orders and Other Laws of General Interest to Safeguards and Security Executives`, and it contains detailed information for use by executives. BNL 52202 is titled `U.S. Statutes of General Interest to Safeguards and Security Officers`, and contains less detail than BNL 52201. It is intended for use by officers. BNL 52203 is titled `U.S. Statutes for Enforcement by Security Inspectors`, and it contains statutes to be applied by uniformed security inspectors.

Cadwell, J.J.; Ruger, C.J.

1995-12-01T23:59:59.000Z

373

Lamp system with conditioned water coolant and diffuse reflector of polytetrafluorethylene(PTFE)  

DOE Patents [OSTI]

A lamp system with a very soft high-intensity output is provided over a large area by water cooling a long-arc lamp inside a diffuse reflector of polytetrafluorethylene (PTFE) and titanium dioxide (TiO.sub.2) white pigment. The water is kept clean and pure by a one micron particulate filter and an activated charcoal/ultraviolet irradiation system that circulates and de-ionizes and biologically sterilizes the coolant water at all times, even when the long-arc lamp is off.

Zapata, Luis E. (Livermore, CA); Hackel, Lloyd (Livermore, CA)

1999-01-01T23:59:59.000Z

374

Office of Compliance Programs PRIVACY POLICY AND PROCEDURES Policy #: 2100.22  

E-Print Network [OSTI]

; · utilization review; · quality assurance; · billing; #12;Office of Compliance Programs PRIVACY POLICY and Accountability Act (HIPAA), Privacy, Security, Breach Notification, and Enforcement Rules at 45 CFR Part 160 and Part 164 ("HIPAA Rules") that relate to the disclosure of a patient's Protected Health Information

375

Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 |  

Broader source: Energy.gov (indexed) [DOE]

June June 2, 2005 Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 June 2, 2005 Enforcement Letter Issued to Lawrence Livermore National Laboratory for Quality Assurance Deficiencies related to Weapon Activities, June 2, 2005 This letter is to inform you of the Department of Energy's (DOE) concern regarding several quality assurance-related deficiencies involving actions by Lawrence Livermore National Laboratory (LLNL) personnel. These deficiencies were associated with a cracked explosive event that occurred at the Pantex site in January 2004. The timing of this letter is intended to coincide with a DOE enforcement action stemming from this event. Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 More Documents & Publications

376

Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 |  

Broader source: Energy.gov (indexed) [DOE]

June June 2, 2005 Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 June 2, 2005 Enforcement Letter Issued to Lawrence Livermore National Laboratory for Quality Assurance Deficiencies related to Weapon Activities, June 2, 2005 This letter is to inform you of the Department of Energy's (DOE) concern regarding several quality assurance-related deficiencies involving actions by Lawrence Livermore National Laboratory (LLNL) personnel. These deficiencies were associated with a cracked explosive event that occurred at the Pantex site in January 2004. The timing of this letter is intended to coincide with a DOE enforcement action stemming from this event. Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 More Documents & Publications

377

Enforcement Letter, Argonne National Laboratory-East - February...  

Broader source: Energy.gov (indexed) [DOE]

February 24, 2000 Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 February 24, 2000 Issued to Argonne National Laboratory related to Bioassay Program...

378

Enforcement Letter, Argonne National Laboratory-East - August...  

Broader source: Energy.gov (indexed) [DOE]

August 6, 1996 Enforcement Letter, Argonne National Laboratory-East - August 6, 1996 August 6, 1996 Issued to the University of Chicago related to an Unplanned and Uncontrolled...

379

Enforcement Letter, Argonne National Laboratory-East - April...  

Broader source: Energy.gov (indexed) [DOE]

April 23, 1997 Enforcement Letter, Argonne National Laboratory-East - April 23, 1997 April 23, 1997 Issued to the University of Chicago related to Radiological Worker Training and...

380

2014-10-06 DOE Certification, Compliance, and Enforcement Overview...  

Broader source: Energy.gov (indexed) [DOE]

Dehumidifiers, Room Air Conditioners, Clothes Washers, Clothes Dryers, and Dishwashers 2014-10-06 DOE Certification, Compliance, and Enforcement Overview for Refrigerators,...

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Office of the Assistant General Counsel for Enforcement | Department...  

Energy Savers [EERE]

advertise. (Note: The Environmental Protection Agency (EPA) enforces compliance with the ENERGY STAR specifications. The Federal Trade Commission ensures that efficiency...

382

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment...  

Broader source: Energy.gov (indexed) [DOE]

of program implementation lessons-learned Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program Reviews More Documents & Publications...

383

DOE Adopts Rules to Improve Energy Efficiency Enforcement | Department...  

Energy Savers [EERE]

Appliance Standards Investigation for Certain Air Con International Air Conditioners and Heat Pumps DOE Announces Tougher Enforcement of Appliance Standards Reporting Requirements...

384

Enforcement Guidance Supplement 00-04: Factual Bases for Issuing...  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance). In particular, it is important to provide contractors and others with explanations on how certain procedural mechanisms provided in Part 820 are utilized to...

385

Enforcement Notice of Intent to Investigate, Battelle Memorial Institute  

Broader source: Energy.gov [DOE]

The DOE Office of Enforcement issued a Notice of Intent to Investigate potential deficiencies in implementing a Chronic Beryllium Disease Prevention Program at the Pacific Northwest National Laboratory.

386

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...  

Office of Environmental Management (EM)

Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

387

2015 DOE Safety and Security Enforcement Workshop | Department...  

Energy Savers [EERE]

Workshop 2015 DOE Safety and Security Enforcement Workshop WHEN: May 5 and 6, 2015 (EFCOG Meeting on May 7) WHERE: Nevada Support Facility Nevada Field Office REGISTRATION FEE:...

388

Office of the Assistant General Counsel for Enforcement  

Broader source: Energy.gov [DOE]

DOE's Office of Enforcement in the Office of the General Counsel leads the Department's efforts to ensure manufacturers deliver products that meet energy and water conservation standards. ...

389

Enforcement Documents - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

the Savannah River Site (EA-2000-08) June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 Issued to Savannah River Ecology Laboratory related to...

390

Enforcement Letter, NEL-2011-01 - March 31, 2011 | Department...  

Office of Environmental Management (EM)

and decommissioning activities on or near uranium hexafluoride and hydrofluoric acid lines at DOE's Paducah Gaseous Diffusion Plant. Enforcement Letter, NEL-2011-01 More...

391

Enforcement Notice of Intent to Investigate, Consolidated Nuclear Security  

Broader source: Energy.gov [DOE]

The DOE Office of Enforcement issued a Notice of Intent to investigate potential mishandling and unauthorized access to classified information at the Y-12 National Security Complex.

392

Enforcement Documents - Savannah River Site | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Savannah River Site Enforcement Documents - Savannah River Site April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. - NCO-2010-02 Consent Order issued to Parsons Infrastructure & Technology Group, Inc. related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter, Amer Industrial Technologies - April 13, 2010

393

Enforcement Documents - Waste Isolation Pilot Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Waste Isolation Pilot Plant Enforcement Documents - Waste Isolation Pilot Plant September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant October 28, 2004 Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 Issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant August 30, 2004 Preliminary Notice of Violation, Washington TRU Solutions, LLC - EA-2004-08 Preliminary Notice of Violation issued to Washington TRU Solutions, LLC,

394

POLICY: A:VPFA # / Purchasing Policy PROCEDURES  

E-Print Network [OSTI]

POLICY: A:VPFA # / Purchasing Policy PROCEDURES: APPENDIX: Approved: April 1, 2013 Revised: Cross References: Purchasing Policy Capital Projects and Renovations Policy Conflict of Interest Policy Sustainability Policy Green Procurement Policy 1 of 9 PROCEDURES: Purchasing Policy AUTHORITY: University

Martin, Jeff

395

Is the light emitting diode (LED) an ultimate lamp?  

Science Journals Connector (OSTI)

Simple diagrams are used to show the transformation of a thin “slab” of intrinsic semiconductor (direct gap k elec =k hole ) from an ideal “flat-band” photopumped recombination-radiation light source into an ultimate lamp a p–n junctionlight emitting diode(LED). A photoexcited intrinsic slab of semiconductor can be regarded as an ideal (“flat-band”) light source with however the photogenerated carriers and voltage available externally instead of as recombination radiation (light) if the slab is converted to half p type (one side) and half n type (the other side) i.e. to a p–n junction. If an equal a “bucking ” external voltage is applied resulting in an input current when the photoexcitation is removed the slab becomes again (remains) an ideal “flat-band” light source a p–n junctionLED. In practice the LED takes the form of a p–n heterostructure in order to improve electron–hole injection reduce the absorption of recombination radiation and to make possible—with proper geometries—improved photon escape.

N. Holonyak Jr.

2000-01-01T23:59:59.000Z

396

Integrated starting and running amalgam assembly for an electrodeless fluorescent lamp  

DOE Patents [OSTI]

An integrated starting and running amalgam assembly for an electrodeless SEF fluorescent lamp includes a wire mesh amalgam support constructed to jointly optimize positions of a starting amalgam and a running amalgam in the lamp, thereby optimizing mercury vapor pressure in the lamp during both starting and steady-state operation in order to rapidly achieve and maintain high light output. The wire mesh amalgam support is constructed to support the starting amalgam toward one end thereof and the running amalgam toward the other end thereof, and the wire mesh is rolled for friction-fitting within the exhaust tube of the lamp. The positions of the starting and running amalgams on the wire mesh are jointly optimized such that high light output is achieved quickly and maintained, while avoiding any significant reduction in light output between starting and running operation.

Borowiec, Joseph Christopher (Schenectady, NY); Cocoma, John Paul (Clifton Park, NY); Roberts, Victor David (Burnt Hills, NY)

1998-01-01T23:59:59.000Z

397

LED Linear Lamps and Troffer Lighting: CALiPER Report Series 21  

Broader source: Energy.gov [DOE]

View the video about CALiPER Report Series 21 on LED Linear Lamps and Troffer Lighting, featuring interviews with Tracy Beeson and Naomi Miller of Pacific Northwest National Laboratory.

398

DOE Publishes CALiPER Report on Lumen and Chromaticity Maintenance of LED PAR38 Lamps  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's CALiPER program has released Report 20.4, which is part of a series of investigations on LED PAR38 lamps. Report 20.4 focuses on lumen maintenance, chromaticity...

399

DOE Publishes CALiPER Snapshot Report on LED A Lamps  

Broader source: Energy.gov [DOE]

DOE's CALiPER program has released a Snapshot Report on LED A lamps, which utilizes the LED Lighting Facts program's extensive product database to help industry stakeholders understand the current state and trajectory of the market for that class

400

DOE Publishes New CALiPER Report on Subjective Evaluation of LED PAR38 Lamps  

Broader source: Energy.gov [DOE]

DOE has published the first in a series of four special investigations intended to extend the findings of CALiPER Application Summary Report 20: LED PAR38 Lamps, which was published late last year.

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Text-Alternative Version: CALiPER Report Series 20 on LED PAR38 Lamps  

Broader source: Energy.gov [DOE]

Michael Royer, Lighting Engineer, Pacific Northwest National Laboratory: The CALiPER program looks at typical LED lamp performance attributes. As we've gone through the progression of reports, we...

402

MISSION CATHODIQUE A L'INTRIEUR DES LAMPES A INCANDESCENCE ; par M. L. HOULLEVIGUE (1).  

E-Print Network [OSTI]

523 �MISSION CATHODIQUE A L'INT�RIEUR DES LAMPES A INCANDESCENCE ; par M. L. HOULLEVIGUE (1). I. Lorsqu'on survolte fortement une lampe à incandescence à filament de charbon, par exemple en mettant sous incandescent. ' , Fic.. 1. Tous ces effets peuvent être attribués, en première analyse, aux électrons émanés du

Boyer, Edmond

403

ISSUANCE 2015-01-26: Energy Conservation Program: Energy Conservation Standards for High-Intensity Lamps, Notice to Reopen Comment Period  

Broader source: Energy.gov [DOE]

Energy Conservation Program: Energy Conservation Standards for High-Intensity Lamps, Notice to Reopen Comment Period

404

Demonstration of LED Retrofit Lamps at the Jordan Schnitzer Museum of Art  

SciTech Connect (OSTI)

The Jordan Schnitzer Museum of Art in Eugene, Oregon, houses a remarkable permanent collection of Asian art and antiquities, modern art, and sculpture, and also hosts traveling exhibitions. In the winter and spring of 2011, a series of digital photographs by artist Chris Jordan, titled "Running the Numbers," was exhibited in the Coeta and Donald Barker Special Exhibitions Gallery. These works graphically illustrate waste (energy, money, health, consumer objects, etc.) in contemporary culture. The Bonneville Power Administration and the Eugene Water and Electricity Board provided a set of Cree 12W light-emitting diode (LED) PAR38 replacement lamps (Cree LRP38) for the museum to test for accent lighting in lieu of their standard Sylvania 90W PAR38 130V Narrow Flood lamps (which draw 78.9W at 120V). At the same time, the museum tested LED replacement lamps from three other manufacturers, and chose the Cree lamp as the most versatile and most appropriate color product for this exhibit. The lamps were installed for the opening of the show in January 2011. This report describes the process for the demonstration, the energy and economic results, and results of a survey of the museum staff and gallery visitors on four similar clusters of art lighted separately by four PAR38 lamps.

Miller, Naomi J.

2011-09-01T23:59:59.000Z

405

Local Enforcement of Appliance Efficiency Standards and Labeling Program in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Local Enforcement of Appliance Efficiency Standards and Labeling Program in Local Enforcement of Appliance Efficiency Standards and Labeling Program in China: Progress and Challenges Title Local Enforcement of Appliance Efficiency Standards and Labeling Program in China: Progress and Challenges Publication Type Conference Proceedings Year of Publication 2012 Authors Zheng, Nina, Nan Zhou, Cecilia Fino-Chen, and David Fridley Conference Name 2012 ACEEE Summer Study on Energy Efficiency in Buildings Date Published 06/2012 Conference Location Pacific Grove, California, U.S.A. Keywords appliance energy efficiency, china, labeling, local enforcement, standards Abstract As part of its commitment to promoting and improving the local enforcement of appliance energyefficiency standards and labeling, the China National Institute of Standardization launched the Nationaland Local Enforcement of Energy Efficiency Standards and Labeling program on August 14, 2009. For thisprogram, Jiangsu, Shandong, Sichuan and Shanghai were selected as pilot locations. This paper providesinformation on the local enforcement program's recent background, activities and results as well ascomparison to previous rounds of check-testing in 2006 and 2007. In addition, the paper also offersevaluation on the achievement and weaknesses in the local enforcement scheme and recommendationsbased on international experience.

406

B&W Pantex Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

John D. Woolery John D. Woolery General Manager B& W Pantex, LLC P.O. Box 30020 Amarillo, Texas 79 120-0020 NEL-20 13-01 Dear Mr. Woolery: Department of Energy Washington, DC 20585 January 7, 2013 The Office of Health, Safety and Security's Office of Enforcement and Oversight has evaluated the facts and circumstances surrounding the conduct of nuc lear explosive operations at Pantex Plant, during the period August 2011 - January 2012, that exceeded the boundaries approved in the current nuclear ex plosive safety study (NESS). This issue was documented in Noncompliance Tracking System (NTS) report NTS--PXSO-B&WP-2012-0002. In August 20 11 , B& W Pantex encountered a difficult-to-remove component. To aid in removal of the component, the nuc lear explosive operating procedures (NEOP) were

407

Enforcement Action - EA-2004-03  

Broader source: Energy.gov (indexed) [DOE]

6, 2004 6, 2004 Mr. Robert A. Pedde, [ ] Westinghouse Savannah River Company Savannah River Site Building 730-1B Aiken, SC 29808 EA 2004-03 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty $206,250 Dear Mr. Pedde: This letter refers to the Department of Energy's Office of Price-Anderson Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the subsequent falsification of radiation dose records. The radiation exposures occurred at the FB-Line facility during material repackaging activities on the morning of July 29, 2003. OE initiated an investigation of the event with a full review of relevant documentation. In

408

Enforcement Action - EA-2003-06  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 Mr. Edward S. Aromi [ ] CH2M Hill Hanford Group, Inc. P.O. Box 1500 Richland, WA 99352 EA 2003-06 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty $82,500 Dear Mr. Aromi: This letter refers to the Department of Energy's Office of Price-Anderson Enforcement (OE) investigation of the facts and circumstances concerning quality assurance issues affecting nuclear safety at the Hanford Tank Farms. These issues involve the inadvertent deenergization of annulus leak detectors, dilution tank overfills, and dome loading control, over the period August 2002 to November 2002. OE initiated an investigation of the issues noted above with a full review of relevant documentation. In addition, discussions that involved the Department of Energy (DOE)

409

Enforcement Action - EA-2002-03  

Broader source: Energy.gov (indexed) [DOE]

2 2 Mr. E. Keith Thomson [ ] Fluor Hanford, Inc. P.O. Box 1000 Mail Stop H5-20 Richland, WA 99352 EA-2002-03 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty $137,500 Dear Mr. Thomson: This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning quality assurance issues affecting nuclear safety surrounding the discrepant nondestructive assay (NDA) data provided to Bechtel Hanford, Inc., in support of their decontamination and dismantlement activities at Building [ ]. The DOE Office of Price-Anderson Enforcement initiated an investigation of this event in July 2001. A formal request for relevant documentation was made and a full review of

410

Worker Safety and Health Enforcement Consent Order  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 Mr. Thomas J. Dieter, President CH2M-WG Idaho, LLC MS 9101 1580 Sawtelle Street Idaho Falls, Idaho 83403 WC0-2011-01 Dear Mr. Dieter: The Office of Health Safety and Security's Office of Enforcement and Oversight has completed its investigation into the facts and circumstances associated with the October 4, 2010, hoisting incident that occurred when a telescopic hydraulic gantry system tipped while lifting a 7 ,800-pound shield plug at the Sodium Bearing Waste Treatment Project (SBWTP) located at the U.S. Department of Energy's Idaho National Laboratory. The results of the investigation were provided to CH2M-WG Idaho, LLC (CWI) in an Investigation Report, dated April20, 2011, and identified potential violations of DOE requirements established at 10 C.F.R. Part 851, Worker Safety and

411

Enforcement Letter NEL-2011-04  

Broader source: Energy.gov (indexed) [DOE]

Christopher P. Leichtweis Christopher P. Leichtweis Chief Executive Officer Safety and Ecology Corporation SEC Business Center 2800 Solway Road Knoxville, TN 37931 NEL-2011-04 Dear Mr. Leichtweis: October 24, 2011 The Office ofHealth, Safety and Security's Office of Enforcement and Oversight conducted an evaluation of the two contamination events at the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) in Niskayuna, New York. On August 24, 2010, contaminated sludge leaked from two pumps inside the Building H2 Tank Farm Weather Enclosure after excessive pressure was applied to clear a clogged nozzle. The sludge contained radioisotopes from nuclear fuel reprocessing and separation testing, including Am-241, Cs-137, Pu-239/240, and Sr-90. Radiological

412

Enforcement Letter - Hanford - 04/16/2002  

Broader source: Energy.gov (indexed) [DOE]

6, 2002 6, 2002 Mr. Kent A. Campbell [ ] Fluor Federal Services 1200 Jadwin Richland, WA 99352 Subject: Enforcement Letter Dear Mr. Campbell: This letter refers to an evaluation by the Department of Energy (DOE) of a December 18, 2001, report of noncompliances with the information requirement provision of 10 CFR 820.11. The noncompliances, described below, were identified by the Pacific Northwest National Laboratory (PNNL) and involve employees of your company. 10 CFR 820.11 requires that any information pertaining to a nuclear activity provided to DOE or maintained for inspection by DOE shall be complete and accurate in all material respects. This provision applies to documentation associated with personnel training requirements for access to nuclear facilities.

413

Enforcement Action - EA-2005-07  

Broader source: Energy.gov (indexed) [DOE]

December 16, 2005 December 16, 2005 Mr. Ronald Gallagher President and Chief Executive Officer Fluor Hanford Incorporated MSIN H5-20 P.O. Box 1000 Richland, WA 99352 EA-2005-07 Subject: Preliminary Notice of Violation and Proposed Civil Penalty - $206,250 Dear Mr. Gallagher: This letter refers to the recent investigation by the Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) at the Plutonium Finishing Plant (PFP) and the K-Basins. The issues at PFP involved continued poor performance with regard to compliance with criticality safety requirements over the past several years and a series of eight Technical Safety Requirement (TSR) violations that occurred over a two-year period between September 2003 and July 2005. The issues at K-Basins involved an

414

Enforcement Action - EA-2005-0001  

Broader source: Energy.gov (indexed) [DOE]

0, 2005 0, 2005 Mr. Edward Aromi [ ] CH2M Hill Hanford Group, Inc. P.O. Box 1500 Richland, WA 99352 EA-2005-01 Subject: Preliminary Notice of Violation and Proposed Civil Penalty - $316,250 Dear Mr. Aromi: This letter refers to the recent investigation by the Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) at the Hanford Tank Farms of four radiological and operational events occurring during 2003 and 2004. The events included (1) the June 2003 multiple personnel contamination event at the [ ]; (2) the November 2003 Technical Safety Requirement violation during a cross-site waste transfer; (3) the November 2003 valve positioning error during S-112 waste retrieval operations; and (4) the July 2004 extremity exposure during thermocouple

415

Enforcement Action - EA-2005-06  

Broader source: Energy.gov (indexed) [DOE]

16, 2005 16, 2005 Dr. Jeffrey Wadsworth President and Chief Executive Officer UT-Battelle , LLC P.O. Box 2008 Oak Ridge, TN 37831-6255 EA-2005-06 Subject: Preliminary Notice of Violation and Proposed Civil Penalty - $110,000 Dear Dr. Wadsworth: This letter refers to the recent investigation by the Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) at the Oak Ridge National Laboratory (ORNL) of two facility categorization events during 2004. The events included (1) Building 7982 and the subsequent identification of Area North of Building 2026 and (2) Building 9204-3 at the Y-12 site. OE also investigated issues related to nuclear material placed in waste containers in the Building 7920 Limited Access Area that exceeded limiting conditions in

416

Enforcement Letter -Idaho-08/04/1998  

Broader source: Energy.gov (indexed) [DOE]

4, 1998 4, 1998 Mr. John Denson [ ] Lockheed Martin Idaho Technologies Company P.O.Box 1625 Idaho Falls, ID 83415 Subject: Enforcement Letter Noncompliance Report NTS-ID--LITCOSITEW-1998-0001 Dear Mr. Denson: This letter refers to the Department of Energy=s (DOE) evaluation of the Lockheed Martin Idaho Technologies Company (LMITCO) subject Noncompliance Tracking System (NTS) report for noncompliances with the requirements of 10 CFR 830.120, "Quality Assurance Requirements." The NTS report addresses a repetitive problem of maintaining the operability of radiation monitoring instrumentation and systems referenced in nuclear facilities authorization basis documents. The repetitive problem was identified by LMITCO on February 27, 1998, and reported to DOE on

417

Enforcement Action EA-2004-08  

Broader source: Energy.gov (indexed) [DOE]

August 30, 2004 August 30, 2004 Dr. Steven Warren [ ] Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, NM 88221-2078 EA-2004-08 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty $82,500 Dear Dr. Warren: This letter refers to the Department of Energy's Office of Price-Anderson Enforcement (OE) investigation of the facts and circumstances concerning the procurement of four transportainers from Diversified Metal Products, Inc. (DMP) and the associated fabrication deficiencies. OE initiated an investigation of the issues with a full review of relevant documentation. In addition, discussions that involved Department of Energy Carlsbad Field Office (DOE-CBFO) and Washington TRU Solutions, LLC (WTS) personnel took place in

418

Enforcement Action EA-2007-05  

Broader source: Energy.gov (indexed) [DOE]

, 2007 , 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. William Elkins Project Director Bechtel National, Inc. 2435 Stevens Center Place Richland, WA 99354 EA-2007-05 Dear Mr. Elkins: This letter refers to the Department of Energy (DOE) investigation into the facts and circumstances associated with design and procurement deficiencies at the Waste Treatment and Immobilization Plant (WTP), currently under construction on the Hanford Site. The Investigation Summary Report, dated May 9, 2007, was provided and an Enforcement Conference conducted on July 11, 2007, in Richland, Washington. A summary of the conference is enclosed. Observed deficiencies in your quality assurance program have raised DOE concerns about the quality level of certain structures, systems, and components

419

NEL-2013-02, LANS Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

2, 20 13 2, 20 13 Dr. Charles F. McMillan Laboratory Director Los Alamos National Security, LLC Mail Stop A-1 00, Drop Point 03 14007 1 S Bikini Atoll Road, T A-3 Los Alamos, New Mexico 87545-1 663 NEL-2013 -02 Dear Dr. McMillan: The Office ofHealth, Safety and Security' s Office of Enforcement and Oversight conducted an evaluation of the deficiencies at the Los Alamos Neutron Science Center (LANSCE) described in the Los A lamos National Security, LLC (LANS) Noncomplia nce Tracking System (NTS) report NTS --LASO-LANS-LANL-2012-00 18, LANSCE Contamination Event, dated September I 0, 20 12. Our evaluation included a review of the Federal accident investigation report, Accident Investigation into Contamination at the Los Alamos Ne utron Science Center on or about August 21, 2012,

420

CWI Enforcement Letter (NEL-2011-02)  

Broader source: Energy.gov (indexed) [DOE]

J. Dieter J. Dieter President Department of Energy Washington, DC 20585 September 28, 2011 CH2M-Washington Group Idaho, LLC P.O. Box 2010 MS-9204 Idaho Falls, Idaho 83403-2010 NEL-2011-02 Dear Mr. Dieter: The Office of Health, Safety and Security's Office of Enforcement and Oversight conducted an evaluation of the facts and circumstances associated with quality assurance and work control deficiencies that occurred during the construction of the Sodium Bearing Waste Treatment Project (SBWTP) at the U.S. Department of Energy's (DOE) Idaho National Laboratory. On February 9, 2011, CH2M-Washington Group Idaho, LLC (CWI) reported noncompliances associated with these deficiencies in DOE's Noncompliance Tracking System (NTS) in reports NTS-ID--CWI-IWTU-2010-0002 and

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Enforcement Letter - Oakland-11/02/1999  

Broader source: Energy.gov (indexed) [DOE]

5, 1999 5, 1999 Dr. Robert W. Kuckuck [ ] Lawrence Livermore National Laboratory P.O. Box 808, L-005 Livermore, CA 94551-0808 Subject: Enforcement Letter (NTS-OAK--LLNL-LLNL-1999-0004, NTS-OAK--LLNL- LLNL-1999-0006, NTS-OAK--LLNL-LLNL-1999-0007) Dear Dr. Kuckuck: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning issues related to the maintenance and adherence to documents which form the authorization basis for Lawrence Livermore National Laboratory (LLNL) operated nuclear facilities. Specifically, three Noncompliance Tracking System (NTS) reports were submitted over a four-day period and are summarized below: 1. On July 30, 1999, it was reported that two cabinets contained about [specified amount] of [ ] solvents in violation of the building Safety Analysis Documentation;

422

WEL-2012-04 URS enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

H. Zarges H. Zarges President Department of Energy Washington, DC 20585 November 5, 2012 URS E&C Holdings Incorporated 7800 East Union A venue, Suite 1 00 Denver, Colorado 8023 7 WEL-2012-04 Dear Mr. Zarges: The Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated a series of fall protection occurrences associated with URS E&C Holdings Incorporated's (URS) operations at the Department of Energy (DOE) Separations Process Research Unit (SPRU) Disposition Project (DP) in Niskayuna, New York. These occurrences took place between November 2011 and July 2012, and included an event involving a URS employee working close to a second floor wall opening in building G2 at SPRU on July 9, 2012. On July 19, 2012, URS reported the noncompliances associated with the July 9 fall hazard

423

Enforcement Action - EA-2004-02  

Broader source: Energy.gov (indexed) [DOE]

Washington, DC 20585 Washington, DC 20585 February 3, 2004 Mr. Alan Parker, [ ] Kaiser-Hill Company, LLC 10808 Highwary 93 Unit B Golden, CO 80403-9200 EA 2004-02 Subject: Preliminary of Violation and Proposed Civil Penalty -$522,500 Dear Mr. Parker: This letter refers to the recent investigation by the Department of Energy (DOE) at the Rocky Flats Environmental Technology Site (RFETS) of the March 2003 [ ] [radioactive material] uptake, the March 2003 building [ ] airflow reversal, the May 2003 building [ ] glovebox fire and the building [ ] Basis for Interim Operation/Technical Safety Requirements issues. An Investigation Summary Report describing the results of that review was issued to you on November 24, 2003. An Enforcement Conference was held on

424

Safety and Security Enforcement Coordinator Handbook | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Coordinator Handbook Coordinator Handbook Safety and Security Enforcement Coordinator Handbook August 1, 2012 This handbook is a companion document to the Enforcement Process Overview (EPO). The Enforcement Coordinator Handbook is intended to serve as a ready reference and source of guidance for use by U.S. Department of Energy (DOE) and contractor enforcement coordinators to facilitate the day-to-day performance of their regulatory compliance assurance responsibilities. This handbook is a companion document to the Enforcement Process Overview (EPO). It provides detailed information on such topics as Noncompliance Tracking System (NTS) and Safeguards and Security Information Management System (SSIMS) notification thresholds that are beyond the scope of the EPO document, but nevertheless are key elements for meeting DOE's

425

Enforcement Documents - Portsmouth Gaseous Diffusion Plant | Department of  

Broader source: Energy.gov (indexed) [DOE]

Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant Enforcement Documents - Portsmouth Gaseous Diffusion Plant March 26, 2010 Enforcement Letter, Intennech, Inc. - March 26, 2010 Enforcement Letter issued to Intermech, Inc. related to Installation and Inspection of Anchor Bolts and Pipe Supports at the DUF6 Conversion Buildings at the Portsmouth and Paducah Gaseous Diffusion Plants March 26, 2010 Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26, 2010 Enforcement Letter issued to Geiger Brothers Mechanical Contractors, Inc. related to Installation and Inspection of Penetration Fire Seals at the DUF6 Conversion Building at the Portsmouth Gaseous Diffusion Plant March 26, 2010 Consent Order, Uranium Disposition Services, LLC - NCO-2010-01 Consent Order issued to Uranium Disposition Services, LLC related to

426

Worker Safety and Health Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Worker Safety and Health Enforcement Worker Safety and Health Enforcement Documents Worker Safety and Health Enforcement Documents Documents Available for Download November 27, 2013 Enforcement Letter, WEL-2013-04 Issued to National Renewable Energy Laboratory related to a drum rupture and flash event of the Thermochemical User Facility. August 29, 2013 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 issued to Brookhaven Science Associates, LLC, related to a Fall Injury Event that occurred in Building 701 at the Brookhaven National Laboratory WEA-2013-01 July 30, 2013 Enforcement Letter, WEL-2013-02 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee

427

Enforcement Letter, WEL-2010-02 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

WEL-2010-02 WEL-2010-02 Enforcement Letter, WEL-2010-02 December 23, 2010 Enforcement Letter issued to National Security Technologies, LLC related to a flash fire event at the Nevada National Security Site The Office of Enforcement reviewed the NSTec fire investigation report, management review report, root cause analysis (RCA), and corrective action plan; the Martin-Harris Construction Environmental, Safety and Health Plan; and the construction subcontract and accompanying exhibits. The Office of Enforcement also obtained and reviewed a number of core company directives, assessments, and inspection documents identified in exhibit E of the subcontract. Enforcement Letter, WEL-2010-02 More Documents & Publications Independent Oversight Review, Nevada National Security - May 2013

428

Enforcement Letter, Lawrence Livermore National Security LLC, - May 15,  

Broader source: Energy.gov (indexed) [DOE]

Security LLC, - May Security LLC, - May 15, 2008 Enforcement Letter, Lawrence Livermore National Security LLC, - May 15, 2008 May 15, 2008 Enforcement Letter issued to Lawrence Livermore National Security, LLC related to the Protection of Classified Information at the Lawrence Livermore National Laboratory In our recent dialogue via televideo with your Deputy, safeguards and security director, and other key managers of your staff, we discussed our reasons for sending this enforcement letter to Lawrence Livermore National Security, LLC; the purpose of this letter; and our concerns about the protection of classified information at the Lawrence Livermore National Laboratory (LLNL). Accordingly, this is not a formal enforcement action and imposes no requirements. Enforcement Letter, Lawrence Livermore National Security LLC- May 15, 2008

429

DOE Awards Hanford Site Law Enforcement Contract to Benton County |  

Broader source: Energy.gov (indexed) [DOE]

Law Enforcement Contract to Benton County Law Enforcement Contract to Benton County DOE Awards Hanford Site Law Enforcement Contract to Benton County December 20, 2012 - 12:00pm Addthis Media Contact Cameron Salony, DOE 509-376-0402, Cameron.Salony@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) today awarded a contract to the Benton County Sheriff's Office in Kennewick, Wash., to provide law enforcement services at the DOE Hanford Site. The contract has a five-year period of performance, consisting of a one-year base period, with four one-year option periods and an approximate total value of $5 million. As the law enforcement contractor, the sheriff's office will: Ensure site employees obey traffic laws Investigate suspected or reported violations of law Apprehend and arrest those suspected of committing violations of law

430

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 May 13, 2009 Enforcement Letter issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory The Department of Energy's Office of Enforcement within the Office of Health, Safety and Security has conducted an evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-ORO--ORNL-X10PHYSICS-2008-000 1, Operational Emergency at Building 6000, Holifield Radioactive Ion Beam Facility. Our evaluation included a review of the Oak Ridge National Laboratory (ORNL) Management Investigation Team Report dated November 19, 2008, the associated corrective action plan,

431

Enforcement Letter, Los Alamos National Security LLC - May 15, 2008 |  

Broader source: Energy.gov (indexed) [DOE]

LLC - May 15, 2008 LLC - May 15, 2008 Enforcement Letter, Los Alamos National Security LLC - May 15, 2008 May 15, 2008 Enforcement Letter issued to Los Alamos National Security, LLC related to the Protection of Classified Information at the Los Alamos National Laboratory In our recent dialogue with you and members of your staff, we discussed our reasons for sending this enforcement letter to Los Alamos National Security, LLC (LANS); the purpose of this letter; and our concerns about the protection of classified information at the Los Alamos National Laboratory (LANL). Accordingly, this is not a formal enforcement action and imposes no requirements. We appreciate the laboratory's perspectives and your ongoing efforts to address these concerns. Enforcement Letter , Bechtel BWXT Idaho LLC - March 17, 2008

432

Enforcement Letter, Sandia Corporation - May 15, 2008 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Corporation - May 15, 2008 Corporation - May 15, 2008 Enforcement Letter, Sandia Corporation - May 15, 2008 May 15, 2008 Enforcement Letter issued to Sandia Corporation related to the Protection of Classified Information at the Sandia National Laboratories In our recent dialogue with Dr. Al Romig, Mr. Michael Hazen and members of your staff, we discussed our reasons for sending this enforcement letter to Sandia Corporation; the purpose of this letter; and our concerns about the protection of classified information at the Sandia National Laboratories (SNL). Accordingly, this is not a formal enforcement action and imposes no requirements. We appreciate the laboratories' perspectives and your ongoing efforts to address these concerns. Enforcement Letter, Sandia Corporation - May 15, 2008

433

Enforcing Energy-Efficiency Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcing Energy-Efficiency Standards Enforcing Energy-Efficiency Standards Enforcing Energy-Efficiency Standards September 13, 2010 - 4:37pm Addthis Scott Blake Harris Former General Counsel What does this mean for me? The Department sets energy efficiency standards for a vast array of consumer and commercial products. The Department had never systematically enforced DOE's 35-year-old energy efficiency standard. Over the past year, we have thus moved quickly and decisively to end that situation. From now on, compliance with all aspects of DOE energy efficiency standards will be expected, and those standards will be enforced. Secretary of Energy Steven Chu has said that when it comes to remediating climate change and promoting energy independence, improved energy efficiency is not just low-hanging fruit-it's fruit lying on the

434

DOE Awards Hanford Site Law Enforcement Contract to Benton County |  

Broader source: Energy.gov (indexed) [DOE]

Awards Hanford Site Law Enforcement Contract to Benton County Awards Hanford Site Law Enforcement Contract to Benton County DOE Awards Hanford Site Law Enforcement Contract to Benton County December 20, 2012 - 12:00pm Addthis Media Contact Cameron Salony, DOE 509-376-0402, Cameron.Salony@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) today awarded a contract to the Benton County Sheriff's Office in Kennewick, Wash., to provide law enforcement services at the DOE Hanford Site. The contract has a five-year period of performance, consisting of a one-year base period, with four one-year option periods and an approximate total value of $5 million. As the law enforcement contractor, the sheriff's office will: Ensure site employees obey traffic laws Investigate suspected or reported violations of law Apprehend and arrest those suspected of committing violations of law

435

Contacts for the Assistant General Counsel for Enforcement (GC-32) |  

Broader source: Energy.gov (indexed) [DOE]

Enforcement (GC-32) Enforcement (GC-32) Contacts for the Assistant General Counsel for Enforcement (GC-32) Laura Barhydt, Assistant General Counsel for Enforcement 202-287-5772 Laura.Barhydt@hq.doe.gov Douglas Rawald, Senior Trial Attorney 202-586-6734 Douglas.Rawald@hq.doe.gov David Case, Trial Attorney 202-287-6998 David.Case@hq.doe.gov Abigail Chingos, Trial Attorney 202-586-5060 Abigail.Chingos@hq.doe.gov Christina Studt, Trial Attorney 202-586-0389 Christina.Studt@hq.doe.gov Deborah Cavanagh, Paralegal 202-287-5643 Deborah.Cavanagh@hq.doe.gov Looking for... Contact Us How to Report an Appliance Regulation Violation Filing a Complaint File a complaint to: energyefficiencyenforcement@hq.doe.gov. The Office of the Assistant General Counsel for Enforcement will protect the identity of complainants to the maximum extent permitted by law.

436

Enforcement Action - EA-2004-02 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Action - EA-2004-02 Enforcement Action - EA-2004-02 Enforcement Action - EA-2004-02 This letter refers to the recent investigation by the Department of Energy (DOE) at the Rocky Flats Environmental Technology Site (RFETS) of the March 2003 [ ] [radioactive material] uptake, the March 2003 building [ ] airflow reversal, the May 2003 building [ ] glovebox fire and the building [ ] Basis for Interim Operation/Technical Safety Requirements issues. An Investigation Summary Report describing the results of that review was issued to you on November 24, 2003. An Enforcement Conference was held on December 16 and 17, 2003, in Germantown, Maryland, with you and members of your staff to discuss these findings. A Conference Summary Report is enclosed. Enforcement Action - EA-2004-02 More Documents & Publications

437

Safety and Security Enforcement Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Safety and Security Enforcement Program Safety and Security Enforcement Program Safety and Security Enforcement Program About Us The Office of Health, Safety and Security's Office of Enforcement and Oversight is responsible for enforcing Federal regulatory requirements pertaining to worker safety and health, nuclear safety, and classified information security programs at Department of Energy (DOE) sites. The United States Congress mandated that the Secretary of Energy promulgate these requirements in order to provide assurance that workers are protected from hazards in the workplace, the potential danger to life and property from the operation of DOE nuclear facilities is minimized, and classified matter is protected from disclosure to sustain our national security. These mandates are reflected in amendments to the Atomic Energy Act of 1954 in

438

DOE Successfully Resolves Three Enforcement Cases and Files Yet Another |  

Broader source: Energy.gov (indexed) [DOE]

Successfully Resolves Three Enforcement Cases and Files Yet Successfully Resolves Three Enforcement Cases and Files Yet Another DOE Successfully Resolves Three Enforcement Cases and Files Yet Another September 29, 2010 - 5:24pm Addthis The Department has resolved three more of the 27 certification enforcement cases initiated three weeks ago and issued one additional penalty notice to Nordyne, LLC for failure to certify certain air conditioner and heat pump products. These actions reflect the Department's continued aggressive efforts to enforce the Department's certification requirement - which helps to ensure that appliance, plumbing, and lighting products meet the energy and water efficiency levels required by law. The three companies - Daewoo International Inc., Amerisink Inc., and Stiebel Eltron, Inc.- have each agreed to pay $5,000 in penalties and to

439

DOE enforcement program roles and responsibilities: DOE handbook  

SciTech Connect (OSTI)

The Price-Anderson Act provides indemnification to DOE contractors who manage and conduct nuclear activities in the DOE complex. The government acts as an insurer for these contractors against any findings of liability from the nuclear activities of the contractor within the scope of its contract. 10 CFR Part 820 establishes the legal framework for implementing DOE`s Nuclear Safety Enforcement Program. Integration with other DOE organizations and programs would assure that the enforcement process properly considers the actual or potential safety significance of a violation when determining an appropriate enforcement sanction. Achieving a proactive contractor compliance assurance rather than a heavy enforcement hand, will require a foundation of cooperation and teamwork across DOE organizations. This handbook identifies the areas of interface for the DOE Enforcement Program and provides guidance on roles and responsibilities for the key DOE organizational areas. It complements DOE-HDBK-1087-95 and 1089-95.

NONE

1995-08-01T23:59:59.000Z

440

Enforcement Documents - Oak Ridge National Laboratory | Department of  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory Oak Ridge National Laboratory Enforcement Documents - Oak Ridge National Laboratory January 20, 2010 Enforcement Letter, Isoteck Systems, LLC - January 20, 2010 Enforcement Letter issued to Isotek Systems, LLC related to Quality Assurance Issues associated with the U233 Material Downblending and Disposition Project at Oak Ridge National Laboratory February 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory December 16, 2005 Preliminary Notice of Violation, UT-Battelle, LLC - EA-2005-06 Preliminary Notice of Violation issued to UT-Battelle, LLC, related to Facility Hazard Categorization and Safety Basis Compliance Issues at Oak

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Trade Policy  

E-Print Network [OSTI]

In an otherwise insightful and thoughtful article, Sebastian Pfotenhauer (Trade Policy Is Science Policy,” Issues, Fall 2013) might better have entitled his contribution “Trade Policy Needs to Be Reconciled with Science ...

Ashford, Nicholas A.

2014-01-01T23:59:59.000Z

442

EQUAL OPPORTUNITIES POLICY POLICY STATEMENT  

E-Print Network [OSTI]

EQUAL OPPORTUNITIES POLICY POLICY STATEMENT Imperial College London is committed to a policy Resources (HR) has overall responsibility for the formulation, implementation and monitoring of the policy that this policy is effective by: · advising the College's senior management, other appropriate members of staff

443

Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in enforcement activities. This enforcement guidance focuses on several issues related to applicability of 10 CFR 830 that have been observed in enforcement and investigation activities.

444

Web Policies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Web Policies Web Policies Accessibility The National Energy Research Scientific Computing Center (NERSC) is part of the Lawrence Berkeley National Laboratory (Berkeley Lab), which...

445

Conservation Standards Enforcement: Importer Q&As  

Broader source: Energy.gov [DOE]

Under the Energy Policy and Conservation Act (EPCA), as amended, an importer is a manufacturer. Therefore, an importer is held to the same standard as a domestic manufacturer -- just as though the importer had built the product(s) it imports. These FAQs are designed to help an importer identify key issues to consider to ensure compliance.

446

Establishment, Implementation and Enforcement of Building Codes and Standards  

Broader source: Energy.gov (indexed) [DOE]

Establishment, Implementation and Enforcement Establishment, Implementation and Enforcement of Building Codes and Standards Nanette Lockwood Global Director Government Affairs Solutia Inc. 2 Crystex ® Solutia Inc. Advanced Interlayers Performance Films Technical Specialties 2010 Revenue $1.9 billion USD Facilities 50+ Employees 3,300 U.S. Building Codes and Standards * Developed, updated and published on regular intervals at the national level for use locally * Adopted by federal agencies, state and local governments * Typically enforced by local building departments * Applies to new construction, additions and major renovations for nearly all buildings Model Building Codes * National development committees - Architects, engineers, builders, scientists, insurers, government researchers, agencies and building officials

447

Enforcement Letter, Parsons Technology Development & Fabrication Complex -  

Broader source: Energy.gov (indexed) [DOE]

Parsons Technology Development & Fabrication Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement's investigation into the facts and circumstances associated with quality assurance deficiencies in the fabrication of safety significant embed plates. These embed plates were fabricated by Parsons Technology Development and Fabrication Complex (PTDFC) a supplier to

448

Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4,  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, Lockheed Martin Idaho Technologies Company - Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4, 1998 Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4, 1998 August 4, 1998 Issued to Lockheed Martin Idaho Technologies Company related to a Repetitive Problem with Instrument Operability at the Idaho National Engineering and Environmental Laboratory This letter refers to the Department of Energy's (DOE) evaluation of the Lockheed Martin Idaho Technologies Company (LMITCO) subject Noncompliance Tracking System (NTS) report for noncompliances with the requirements of 10 CFR 830.120, "Quality Assurance Requirements." The NTS report addresses a repetitive problem of maintaining the operability of radiation monitoring instrumentation and systems referenced in nuclear facilities authorization

449

Energy-Efficient, High-Color-Rendering LED Lamps Using Oxyfluoride and Fluoride Phosphors  

SciTech Connect (OSTI)

LED lamps using phosphor downconversion can be designed to replace incandescent or halogen sources with a 'warm-white' correlated color temperature (CCT) of 2700-3200 K and a color rendering index (CRI) greater than 90. However, these lamps have efficacies of {approx}70% of standard 'cool-white' LED packages (CCT = 4500-6000 K; CRI = 75-80). In this report, we describe structural and luminescence properties of fluoride and oxyfluoride phosphors, specifically a (Sr,Ca){sub 3}(Al,Si)O{sub 4}(F,O):Ce{sup 3+} yellow-green phosphor and a K{sub 2}TiF{sub 6}:Mn{sup 4+} red phosphor, that can reduce this gap and therefore meet the spectral and efficiency requirements for high-efficacy LED lighting. LED lamps with a warm-white color temperature (3088 K), high CRI (90), and an efficacy of {approx}82 lm/W are demonstrated using these phosphors. This efficacy is {approx}85% of comparable cool-white lamps using typical Y{sub 3}Al{sub 5}O{sub 12}:Ce{sup 3+}-based phosphors, significantly reducing the efficacy gap between warm-white and cool-white LED lamps that use phosphor downconversion.

Setlur, A.; Radkov, E; Henderson, C; Her, J; Srivastava, A; Karkada, N; Kishore, M; Kumar, N; Aesram, D; et al.

2010-01-01T23:59:59.000Z

450

DOE Publishes Notice of Public Meeting and Availability of the Framework Document for General Service Lamps Energy Conservation Standards  

Broader source: Energy.gov [DOE]

The Department of Energy has published a Federal Register notice of public meeting and availability of the framework document regarding energy conservation standards for general service lamps.

451

L-Prize Competition Winner 60W Incandescent Replacement Lamp Update  

Broader source: Energy.gov (indexed) [DOE]

Interagency Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International March 15, 2012 Cost of electricity 1 cent per kilowatt-hour The Washington Post, March 8, 2012 Page One 2 Cost of electricity 11 cents per kilowatt-hour The Washington Post, March 9, 2012 Page Two 3 What Is the L Prize? * Technology competition to spur innovation and exceptional performance * Created by Energy Independence and Security Act (EISA 2007) Sec. 655 * Two key lamp replacements: 60W Incandescent and PAR 38 Halogen * Future focus: 21 st Century Lamp * Cash prizes, federal purchasing, utility programs 4 Philips Wins First L Prize * August 3, 2011: Philips

452

L-Prize Competition Winner 60W Incandescent Replacement Lamp Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interagency Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International March 15, 2012 Cost of electricity 1 cent per kilowatt-hour The Washington Post, March 8, 2012 Page One 2 Cost of electricity 11 cents per kilowatt-hour The Washington Post, March 9, 2012 Page Two 3 What Is the L Prize? * Technology competition to spur innovation and exceptional performance * Created by Energy Independence and Security Act (EISA 2007) Sec. 655 * Two key lamp replacements: 60W Incandescent and PAR 38 Halogen * Future focus: 21 st Century Lamp * Cash prizes, federal purchasing, utility programs 4 Philips Wins First L Prize * August 3, 2011: Philips

453

Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Division - October Waste Isolation Division - October 3, 2000 Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 October 3, 2000 Issued to Westinghouse Waste Isolation Division related to Quality Assurance and Occupational Radiation Protection Noncompliances at the Waste Isolation Pilot Plant This letter refers to an evaluation by the Department of Energy (DOE) of four noncompliances with the requirements of the Quality Assurance Rule (10 CFR 830.120) and/or the Occupational Radiation Protection Rule (10 CFR 835) at the Waste Isolation Pilot Plant (WIPP). Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 More Documents & Publications Enforcement Letter, Westinghouse Savannah River Company - July 21, 1998 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997

454

DOE Extends Comment Period on Certification and Enforcement Notice of  

Broader source: Energy.gov (indexed) [DOE]

Certification and Enforcement Notice Certification and Enforcement Notice of Proposed Rulemaking DOE Extends Comment Period on Certification and Enforcement Notice of Proposed Rulemaking October 15, 2010 - 10:22am Addthis In response to a formal request, the Department has extended to October 29, 2010, the deadline for submission of comments in response to the Notice or Proposed Rulemaking on the certification and enforcement of the Department's energy conservation standards. (75 FR 56796). The signed extension provided here will be published shortly in the Federal Register. Addthis Related Articles DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act Department of Energy Issues Final Rule on Loan Guarantees

455

Department of Energy Initiates Formal Enforcement Action in Los Alamos  

Broader source: Energy.gov (indexed) [DOE]

Initiates Formal Enforcement Action in Los Initiates Formal Enforcement Action in Los Alamos National Laboratory Classified Information Breach Department of Energy Initiates Formal Enforcement Action in Los Alamos National Laboratory Classified Information Breach July 13, 2007 - 2:54pm Addthis WASHINGTON, DC - Following extensive investigations, the Department of Energy (DOE) and its National Nuclear Security Administration (NNSA) took formal enforcement actions today against the University of California (UC) and the Los Alamos National Security, LLC (LANS), the prior and current management and operating contractors of the Los Alamos National Laboratory in New Mexico, for violations of classified information security requirements under their respective contracts. Investigations revealed that management deficiencies of both contractors were a central

456

Building Energy Codes ENFORCEMENT TOOLKIT BUILDING TECHNOLOGIES PROGRAM  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ENFORCEMENT TOOLKIT ENFORCEMENT TOOLKIT BUILDING TECHNOLOGIES PROGRAM Building Energy Codes ACE LEARNING SERIES i Building Energy Codes ENFORCEMENT TOOLKIT Prepared by: Building Energy Codes Program The U.S. Department of Energy's Building Energy Codes Program is an information resource on energy codes and standards for buildings. They work with other government agencies, state and local jurisdictions, organizations that develop model codes and standards, and building industry to promote codes that will provide for energy and environmental benefits and help foster adoption of, compliance with, and enforcement of those codes. September 2012 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 PNNL-SA-90467 LEARNING SERIES OVERVIEW Building Energy Codes ACE

457

Enforcement Guidance Supplement 01-02: Management and Independent  

Broader source: Energy.gov (indexed) [DOE]

provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on DOE contractors. DOE enforcement activities to date have indicated the need for improvement in contractor compliance with the Management and Independent Assessment (M&IA) requirements of 10 CFR 830.122. This EGS signals an increased emphasis by OE in this area, and describes the general approach that will be used by OE in evaluating compliance of nuclear-safety related M&IA Programs. EGS0102.PDF Description

458

Enforcement Action - EA-2004-03 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Action - EA-2004-03 Enforcement Action - EA-2004-03 Enforcement Action - EA-2004-03 This letter refers to the Department of Energy's Office of Price-Anderson Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the subsequent falsification of radiation dose records. The radiation exposures occurred at the FB-Line facility during material repackaging activities on the morning of July 29, 2003. OE initiated an investigation of the event with a full review of relevant documentation. In addition, discussions that involved Department of Energy Savannah River Operations Office (DOE-SR) and WSRC personnel took place at the Savannah River Site on January 13 -14, 2004. Our findings were provided

459

Enforcement Letter, Bechtel BWXT Idaho - March 31, 2006 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Idaho - March 31, 2006 Idaho - March 31, 2006 Enforcement Letter, Bechtel BWXT Idaho - March 31, 2006 March 31, 2006 Enforcement Letter issued to Bechtel BWXT Idaho, LLC, related to External Radiation Dosimetry Accreditation Issues at the Idaho National Laboratory This letter is to inform you of the Department of Energy's (DOE) concern regarding a quality assurance-related deficiency stemming from the recent external radiation dosimetry performance testing by the DOE Laboratory Accreditation Program (DOELAP) of dosimeters utilized at Idaho National Laboratory (INL). This deficiency was identified through the quality assurance testing of external dosimeters by CH2MWG Idaho (CWI) staff. Enforcement Letter, Bechtel BWXT Idaho More Documents & Publications DOE-STD-1095-2011 Enforcement Letter, CH2M Hill - October 4, 2004

460

Enforcement Letter, Washington TRU Solutions - September 8, 2006 |  

Broader source: Energy.gov (indexed) [DOE]

Washington TRU Solutions - September 8, 2006 Washington TRU Solutions - September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-CBFO-WIPP-WIPP-2006-0001. Our evaluation included review of the investigation/causal analysis and discussion with you and other site personnel during an informal conference held on August 1, 2006. Enforcement Letter, Washington TRU Solutions -September 8, 2006

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Division - October Waste Isolation Division - October 3, 2000 Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 October 3, 2000 Issued to Westinghouse Waste Isolation Division related to Quality Assurance and Occupational Radiation Protection Noncompliances at the Waste Isolation Pilot Plant This letter refers to an evaluation by the Department of Energy (DOE) of four noncompliances with the requirements of the Quality Assurance Rule (10 CFR 830.120) and/or the Occupational Radiation Protection Rule (10 CFR 835) at the Waste Isolation Pilot Plant (WIPP). Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 More Documents & Publications Enforcement Letter, Westinghouse Savannah River Company - July 21, 1998 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997

462

Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the  

Broader source: Energy.gov (indexed) [DOE]

Supplement 03-01 Supplemental Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 In October 2000, the Office of Price-Anderson Enforcement (OE) issued Enforcement Guidance Supplement (EGS) 00-04, "Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR subpart C." That EGS, in part, delineated a set of criteria that OE would use to determine whether to apply its enforcement discretion, in this case through the use of Consent Orders. Those criteria provided both guidance to DOE contractors regarding situations for which the use of

463

DOE Continues Aggressive Energy Efficiency Enforcement Effort with Nearly  

Broader source: Energy.gov (indexed) [DOE]

Continues Aggressive Energy Efficiency Enforcement Effort with Continues Aggressive Energy Efficiency Enforcement Effort with Nearly 30 New Proposed Penalties DOE Continues Aggressive Energy Efficiency Enforcement Effort with Nearly 30 New Proposed Penalties September 13, 2010 - 12:00am Addthis Washington, D.C. - As part of an ongoing commitment to rigorously enforce appliance efficiency requirements, the Department of Energy today announced 27 new proposed penalties against companies selling products in the United States without certifying that they comply with energy efficiency or water conservation standards. The legally required certifications help ensure that products sold in the U.S. deliver significant energy and cost savings to the American public. The 27 companies include manufacturers, importers, and private labelers of appliance, plumbing, and lighting products.

464

Support for ENERGY STAR Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Support for ENERGY STAR Enforcement Support for ENERGY STAR Enforcement Support for ENERGY STAR Enforcement By offering a means for consumers to buy products more energy-efficient than required by law, ENERGY STAR has huge potential to save money for consumers by offering buyers more options in energy-efficient products. In a new initiative, the Department is expanding verification and supporting enforcement of ENERGY STAR to preserve the viability and effectiveness of the ENERGY STAR program. Through independent testing, we are working to verify manufacturer certifications of the efficiency or energy use ratings of their appliances and ensuring manufacturers provide the increased energy and cost savings they advertise. Learn more about ENERGY STAR and DOE's ENERGY STAR Verification Testing

465

Office of Enforcement Final Notice of Violation to Pacific Underground  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Final Notice of Violation to Pacific Enforcement Final Notice of Violation to Pacific Underground Construction, Inc. September 3, 2009 Office of Enforcement Final Notice of Violation to Pacific Underground Construction, Inc. September 3, 2009 Pursuant to section 234C of the Atomic Energy Act, as amended, 42 U.S.C. § 2282c, and the Department of Energy's (DOE) regulations at 10 C.F.R. Part 851, Worker Safety and Health Program, DOE is issuing this Final Notice of Violation (FNOV) to Pacific Underground Construction, Inc. (PUC). The FNOV finds PUC liable for violating DOE's worker safety and health requirements. The FNOV is based upon the Office of Enforcement's July 23, 2008, Investigation Report and a careful and thorough review of all evidence presented to DOE by PUC, including your response to the Preliminary Notice

466

DOE Announces Additional Energy Efficiency Enforcement Action to Protect  

Broader source: Energy.gov (indexed) [DOE]

Additional Energy Efficiency Enforcement Action to Additional Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am Addthis Washington, DC - The Department of Energy announced today that it has entered into a Consent Decree with Haier America resolving an investigation into whether Haier violated DOE's energy efficiency standards. DOE's investigation led Haier to determine that a parts defect caused certain freezers to consume more energy than represented to consumers and possibly violated DOE's energy efficiency standards and the ENERGY STAR® requirements for freezers. As part of the Obama Administration's commitment to enforcing energy efficiency, this Consent Decree obligates Haier to notify affected consumers, repair defective units, and pay a

467

Enforcement Letter, Bechtel Nevada - February 26, 2003 | Department of  

Broader source: Energy.gov (indexed) [DOE]

February 26, 2003 February 26, 2003 Enforcement Letter, Bechtel Nevada - February 26, 2003 February 26, 2003 Enforcement Letter issued to Bechtel Nevada related to Authorization Basis Noncompliances at the Nevada Test Site This letter refers to the Department of Energy's (DOE's) review of the facts and circumstances related to certain nuclear safety noncompliances during 2002 at the Nevada Test Site. These noncompliances were identified in the process of conducting a limited Price-Anderson Amendments Act (PAAA) Program Review of Bechtel Nevada during November 14-15, 2002, by DOE's Office of Price-Anderson Enforcement (OE), in coordination with DOE's National Nuclear Security Administration Nevada Site Office (NNSA/NSO). These matters are being called to your attention through this Enforcement Letter since these noncompliances had not been

468

Enforcement Letter, CH2M Hill Hanford Group Inc, - September...  

Office of Environmental Management (EM)

CH2M Hill Hanford Group Inc, - September 6, 2007 Enforcement Letter, CH2M Hill Hanford Group Inc, - September 6, 2007 September 6, 2007 Issued to CH2M Hill Hanford Group, Inc.,...

469

Enforcement Notice of Intent to Investigate, UT-Battelle  

Broader source: Energy.gov [DOE]

The DOE Office of Enforcement issued a Notice of Intent to Investigate potential programmatic deficiencies in implementing requirements for assessing and controlling material handling hazards at DOE's Oak Ridge National Laboratory.

470

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 May 13, 2009 Issued to UT-Battelle, LLC related to a...

471

Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002...  

Broader source: Energy.gov (indexed) [DOE]

- May 31, 2002 Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002 May 31, 2002 Issued to UT-Battelle, LLC related to Unplanned Radiation Exposures at Oak Ridge...

472

Enforcement Letter, WEL-2014-01 - April 10, 2014 | Department...  

Office of Environmental Management (EM)

4-01 - April 10, 2014 Enforcement Letter, WEL-2014-01 - April 10, 2014 April 10, 2014 Issued to Savannah River Remediation, LLC related to an employee shoulder injury sustained...

473

Enforcement Letter, NEL-2014-01 - April 25, 2014 | Department...  

Energy Savers [EERE]

NEL-2014-01 - April 25, 2014 Enforcement Letter, NEL-2014-01 - April 25, 2014 April 25, 2014 Issued to CH2M HILL Plateau Remediation Company relating to the discovery of a sealed...

474

Enforcement Letter, WEL-2014-02 - April 17, 2014 | Department...  

Office of Environmental Management (EM)

WEL-2014-02 - April 17, 2014 Enforcement Letter, WEL-2014-02 - April 17, 2014 April 17, 2014 Issued to B&W Pantex, LLC, related to six events involving improper management,...

475

Enforcement Letter, On Computer Services, LLC - WEL-2012-03 ...  

Broader source: Energy.gov (indexed) [DOE]

On Computer Services, LLC - WEL-2012-03 Enforcement Letter, On Computer Services, LLC - WEL-2012-03 October 23, 2012 Issued to On Computer Services, LLC, related to an Employee...

476

Data Collection With Self-Enforcing Privacy Philippe Golle  

E-Print Network [OSTI]

Data Collection With Self-Enforcing Privacy Philippe Golle Palo Alto Research Center pgolle of a population. Such information can have substantial value to the pollster, but the pollster is faced

Golle, Philippe

477

SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT  

Broader source: Energy.gov [DOE]

Please submit the Semi-Annual Davis-Bacon Enforcement Report in the Performance and Accountability for Grants in Energy (PAGE) system. If you do not have access to the PAGE system, please submit...

478

Enforcement Letter, CH2M Hill - October 4, 2004 | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Process Research Unit On October 4, 2004, the U.S. Department of Energy (DOE) issued a nuclear safety Enforcement Letter to CH2M Hill concerning expiration of the company's...

479

Alaska APDES Enforcement Response Guide | Open Energy Information  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska APDES Enforcement Response GuidePermittingRegulatory GuidanceGuideHandbook...

480

Enforcement Notice of Intent to Investigate, Skookum Contract Services  

Broader source: Energy.gov [DOE]

The DOE Office of Enforcement issued a Notice of Intent to Investigate potential worker safety and health noncompliances at the DOE Office of Secure Transportation’s Vehicle Maintenance Facility in Oak Ridge, Tennessee.

Note: This page contains sample records for the topic "lamps enforcement policy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Enforcement Notice of Intent to Investigate, National Security Technologies, LLC  

Broader source: Energy.gov [DOE]

The DOE Office of Enforcement issued a Notice of Intent to Investigate potential worker safety and health noncompliances associated with a chemical explosion that occurred at the Nevada National Security Site.

482

Enforcement Letter, LVI Services Inc. - October 28, 2013 | Department...  

Energy Savers [EERE]

Letter, LVI Services Inc. - October 28, 2013 July 8, 2014 Worker Safety and Health Enforcement Letter issued to LVI Services Inc. On October 28, 2013, the U.S....

483

Enforcement Letter, Wise Services, Inc - July 9, 2014 | Department...  

Office of Environmental Management (EM)

related to a track hoe operated by a Wise Services employee that struck a fiber optics line at the DOE Portsmouth Gaseous Diffusion Plant on November 8, 2012. Enforcement...

484

Price-Anderson Nuclear Safety Enforcement Program. 1997 annual report  

SciTech Connect (OSTI)

This report summarizes activities in the Department of Energy's Price-Anderson Amendments Act (PAAA) Enforcement Program in calendar year 1997 and highlights improvements planned for 1998. The DOE Enforcement Program involves the Office of Enforcement and Investigation in the DOE Headquarters Office of Environment, Safety and Health, as well as numerous PAAA Coordinators and technical advisors in DOE Field and Program Offices. The DOE Enforcement Program issued 13 Notices of Violation (NOV`s) in 1997 for cases involving significant or potentially significant nuclear safety violations. Six of these included civil penalties totaling $440,000. Highlights of these actions include: (1) Brookhaven National Laboratory Radiological Control Violations / Associated Universities, Inc.; (2) Bioassay Program Violations at Mound / EG and G, Inc.; (3) Savannah River Crane Operator Uptake / Westinghouse Savannah River Company; (4) Waste Calciner Worker Uptake / Lockheed-Martin Idaho Technologies Company; and (5) Reactor Scram and Records Destruction at Sandia / Sandia Corporation (Lockheed-Martin).

NONE

1998-01-01T23:59:59.000Z

485

Requirement Enforcement by Transformation Automata Douglas R. Smith  

E-Print Network [OSTI]

Requirement Enforcement by Transformation Automata Douglas R. Smith Kestrel Institute 3260 Hillview Avenue Palo Alto, California 94304 USA smith@kestrel.edu ABSTRACT The goal of this work is to treat

Leavens, Gary T.

486

Enforcement Letter, NEL-2011-03 - October 24, 2011 | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

an Enforcement Letter to EnergySolutions, LLC related to a radiological event caused by pumps that leaked contaminated sludge inside the H2 Tank Farm Weather Enclosure at DOE's...

487

Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 |  

Broader source: Energy.gov (indexed) [DOE]

February 24, February 24, 2000 Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 February 24, 2000 Enforcement Letter issued to Argonne National Laboratory related to Bioassay Program Deficiencies at Argonne National Laboratory-East, February 24, 2000 This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the above referenced Noncompliance Tracking System(NTS) report describing bioassay program deficiencies at Argonne National Laboratory-East (ANL-E). This report was submitted to DOE on December 23, 1999. Approximately thirteen months previous to this NTS report's submittal, DOE's Office of Enforcement and Investigation (EH-Enforcement) issued to all DOE and contractor Price-Anderson Amendments Act coordinators a

488

Enforcement Letter, WEL-2013-02 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, WEL-2013-02 Enforcement Letter, WEL-2013-02 Enforcement Letter, WEL-2013-02 July 30, 2013 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee The U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated the facts and circumstances surrounding a loss of breathing air within the Box Breakdown Area (BBA) of the Transuranic Waste Processing Center (TWPC), which led to the expedited egress of two workers in supplied-air suits and one worker in a supplied-air hood. Wastren Advantage, Inc. (WAI) manages and operates the TWPC, located in Oak Ridge, Tennessee, under a contract with DOE and is

489

Worker Safety and Health Enforcement Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

, 2009 , 2009 Preliminary Notice of Violation, Western Allied Mechanical, Inc. - WEA-2010-03 Preliminary Notice of Violation issued to Sandia Corporation related to the Inadvertent Ignition of a Rocket Motor May 20, 2009 Enforcement Letter, CH2M-Washington Group Idaho LLC , - May 20, 2009 Enforcement Letter issued to CH2M-Washington Group Idaho, LLC, for Electrical Safety Deficiencies at the Idaho National Laboratory February 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory June 20, 2008 Preliminary Notice of Violation, Battelle Energy Alliance, LLC - WEA-2008-01 Notice of Violation issued to Battelle Energy Alliance, LLC, related to a

490

Enforcement Letter, WEL-2012-05 - December 20, 2012 | Department...  

Office of Environmental Management (EM)

2012 Enforcement Letter, WEL-2012-05 - December 20, 2012 December 20, 2012 Issued to Alliance for Sustainable Energy, LLC, related to an Electrical Shock Near Miss Incident that...

491

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

processes to promote development and operation of sustainable buildings. #12;Policies, Procedures and Guidelines Complete Policy Title: Sustainable Building Policy Policy this electronic policy and the written copy held by the policy owner, the written copy prevails. Sustainable

Haykin, Simon

492

Enforced Pregnancy, Rape, and the Image of Woman  

E-Print Network [OSTI]

1 Enforced Pregnancy, Rape, and the Image of Woman Ann E. Cudd1 Most philosophical discussions of abortion focus on the harms and rights of the individual women and fetuses directly involved. They concentrate on the questions... to control their reproduction. The claim is that enforcing pregnancy degrades women in such a way that all women are harmed, and not just those who become pregnant against their will. How are we to conceive of women? Is their capacity for bearing...

Cudd, Ann E.

1990-01-01T23:59:59.000Z

493

Enforcing Building Energy Codes in China: Progress and Comparative Lessons  

SciTech Connect (OSTI)

From 1995 to 2005, building energy use in China increased more rapidly than the world average. China has been adding 0.4 to 1.6 billion square meters of floor space annually , making it the world’s largest market for new construction. In fact, by 2020, China is expected to comprise half of all new construction. In response to this, China has begun to make important steps towards achieving building energy efficiency, including the implementation of building energy standards that requires new buildings to be 65% more efficient than buildings from the early 1980s. Making progress on reducing building energy use requires both a comprehensive code and a robust enforcement system. The latter – the enforcement system – is a particularly critical component for assuring that a building code has an effect. China has dramatically enhanced its enforcement system in the past two years, with more detailed requirements for ensuring enforcement and new penalties for non-compliance. We believe that the U.S. and other developed countries could benefit from learning about the multiple checks and the documentation required in China. Similarly, some of the more user-friendly enforcement approaches developed in the U.S. and elsewhere may be useful for China as it strives to improve enforcement in rural and smaller communities. In this article, we provide context to China’s building codes enforcement system by comparing it to the U.S. Among some of the enforcement mechanisms we look at are testing and rating procedures, compliance software, and training and public information.

Evans, Meredydd; Shui, Bin; Halverson, Mark A.; Delgado, Alison

2010-08-15T23:59:59.000Z

494

Commercial Energy Code Enforcement in Oregon and Washington  

E-Print Network [OSTI]

energy efEiciency in new and remodeled commercial buildings. The studies were performed for the Bonneville Power Administration to better understand the current enEorcement practices and costs of enforcing the commercial energy codes in these two... energy efEiciency in new and remodeled commercial buildings. The studies were performed for the Bonneville Power Administration to better understand the current enEorcement practices and costs of enforcing the commercial energy codes in these two...

Johnson, M.; Miller, W.; O'Neill, M.

1988-01-01T23:59:59.000Z

495

Pump-lamp firing-pulse generator for solid-state lasers  

SciTech Connect (OSTI)

This paper describes a generator that provides, with maximum output-pulse amplitude, sequential or external firing of four INP16/250 (IFP-8000) lamps at a frequency of 1 Hz. The energy and time characteristics of the generator are improved as compared with similar devices, which provides a time instability of the delay between a generator-trigger pulse and the optical pumping pulse of + or - 1 usec. The output-pulse amplitude can be varied according to the type and number of lamps fired. Measures are taken to reduce the supply noise produced in firing-pulse generation and to increase the operating safety of the device.

Denishchik, Y.S.

1985-12-01T23:59:59.000Z

496

The nature of the Chinese IPR administrative enforcement system Salom Lachat*, Daniel Lachat**  

E-Print Network [OSTI]

The nature of the Chinese IPR administrative enforcement system Salomé Lachat*, Daniel Lachat** Abstract. Assessing IPR enforcement sys- tems is usually performed by comparison of the results achieved the Chinese IPR enforcement system. It suggests switching slowly to court enforce- ment with the aim

Paris-Sud XI, Université de

497

Compliance, Certification and Enforcement for US Appliance and Equipment Energy Efficiency Programs by US DOE  

Office of Energy Efficiency and Renewable Energy (EERE)

Information about energy and water conservation standards, ENERGY STAR, and compliance and certification enforcement.

498

RAMP Contractors Enforcement Letter, WEL-2014-03- May 21, 2014  

Broader source: Energy.gov [DOE]

Worker Safety and Health Enforcement Letter issued to Multiple National Nuclear Security Administration Contractors

499

Compliance, Certification and Enforcement for US Appliance and Equipment Energy Efficiency Programs by US DOE  

Broader source: Energy.gov (indexed) [DOE]

Compliance, Certification and Enforcement Compliance, Certification and Enforcement for US Appliance and Equipment Energy Efficiency Programs by US DOE As the Department of Energy is ramping up its focus on energy-efficiency, the Office of the General Counsel is stepping up enforcement and verification efforts to ensure manufacturers meet the energy and water conservation standards expected of them and save energy for American consumers and businesses. Recent enforcement initiatives go beyond compliance with energy-efficiency standards. We are working to protect consumers through verification and supporting the enforcement of Energy Star specifications to ensure that manufacturers offer the energy savings they advertise. Enforcement initiatives include: * Conservation Standards Enforcement

500

ESnet Policy Board  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ESnet Policy Board About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Facility Data Policy Career Opportunities...