Powered by Deep Web Technologies
Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Spacer Damper Replacement Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus Tom Fletcher,Future |Carlos ValenciaSpaceSpace-AgeSpacer Damper

2

Microsoft Word - CX-Echo Lake-Monroe Spacers_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

17, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Spacer-damper replacements on the Echo...

3

CX-002429: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Echo Lake-Monroe Spacer-Damper ReplacementsCX(s) Applied: B1.3Date: 05/17/2010Location(s): King County, WashingtonOffice(s): Bonneville Power Administration

4

Microsoft Word - CX-Grizzly-CaptainJack_No1_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

21, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Grizzly -...

5

Microsoft Word - CX-DworshakPH-Dworshak1spacers_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Dworshak...

6

Microsoft Word - CX-McNary-Coyote Springs_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

May 26, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the...

7

Microsoft Word - CX-Wautoma-Rock Creek_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the...

8

CX-001414: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Coyote Springs-Slatt #1: Spacer Damper ReplacementsCX(s) Applied: B1.3Date: 04/12/2010Location(s): Gilliam County, Oregon Office(s): Bonneville Power Administration

9

CX-004258: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Replace Spacer Dampers Along the Ostrander-McLaughlin Number 1 500-Kilovolt Transmission LineCX(s) Applied: B1.3Date: 09/29/2010Location(s): Clackamas County, OregonOffice(s): Bonneville Power Administration

10

CX-004256: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Replace Spacer Dampers Along the Dworshak PH-Dworshak Number 1 500-Kilovolt Transmission LineCX(s) Applied: B1.3Date: 10/05/2010Location(s): Clearwater County, IdahoOffice(s): Bonneville Power Administration

11

CX-005131: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Spacer-Damper Replacements on the Captain Jack-Malin 500-kilovolt Transmission LineCX(s) Applied: B1.3Date: 01/24/2011Location(s): Klamath County, OregonOffice(s): Bonneville Power Administration

12

CX-001944: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Replace Spacer Dampers Along the Grizzly - Captain Jack No. 1 500 Kilovolt Transmission LineCX(s) Applied: B1.3Date: 04/21/2010Location(s): Crook County, OregonOffice(s): Bonneville Power Administration

13

CX-004257: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Replace Spacer Dampers Along the Slatt-John Day Number 1 500-Kilovolt Transmission LineCX(s) Applied: B1.3Date: 10/04/2010Location(s): Sherman County, OregonOffice(s): Bonneville Power Administration

14

CX-002532: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Spacer Damper Replacements on the McNary-Coyote Springs Number-1 Transmission LineCX(s) Applied: B1.3Date: 05/26/2010Location(s): MorrowCounty, OregonOffice(s): Bonneville Power Administration

15

Microsoft Word - CX-Schultz-Raver_3_and_4_spacers_WEBa.doc  

Broader source: Energy.gov (indexed) [DOE]

Action: Replace spacer dampers along the Schultz - Raver No. 3 & 4 500-kV transmission lines Budget Information: Work Order 255064 PP&A Project No.: PP&A 1160 Categorical...

16

Microsoft Word - CX-ChiefJosephPHspacers_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEPR-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Program Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Chief Joseph PH-Chief Joseph No. 6...

17

Microsoft Word - CX-Slatt-John Day Spacers_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Slatt-John...

18

CX-004255: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Replace Spacer Dampers Along the Chief Joseph PH-Chief Joseph Number 6 500-Kilovolt Transmission LineCX(s) Applied: B1.3Date: 10/05/2010Location(s): Douglas County, WashingtonOffice(s): Bonneville Power Administration

19

CX-001185: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission LineCX(s) Applied: B1.3Date: 03/03/2010Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration

20

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

spacer- dampers for Mead-Phoenix. * Given projected decrease in costs of Mead transformers, no rate impact anticipated due to spacer damper project 12 Asset Management...

22

First SNS Target Replacement  

E-Print Network [OSTI]

First SNS Target Replacement Experience M. Dayton, M. Rennich, Van Graves, J. DeVore Presented by T.S. Department of Energy AHIP Workshop Oct. 2009 Overview · Initial Target Replacement · Target Maintenance-Battelle for the U.S. Department of Energy AHIP Workshop Oct. 2009 First SNS Target Replacement · Replacement

McDonald, Kirk

23

Analyzing Replacement Stock Alternatives  

E-Print Network [OSTI]

Replacement management strategy involves comparing the values of the breeding stock you own with the value of potential replacements, and then choosing the investment with the highest expected worth. This publication discusses the application...

Falconer, Lawrence; McGrann, James M.; Parker, John; Jones, Rodney

2008-10-21T23:59:59.000Z

24

Radiation Source Replacement Workshop  

SciTech Connect (OSTI)

This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

2010-12-01T23:59:59.000Z

25

Diploma Replacement Order diploma-replace 1/12  

E-Print Network [OSTI]

Diploma Replacement Order diploma-replace 1/12 A replacement diploma may be ordered in the event of loss of or damage to the original diploma. Replacement diplomas are 17? 14 ("mini" diplomas or letter-sized diplomas are no longer available). The replacement diploma fee is $50, payable by check or credit card

Shamos, Michael I.

26

Video face replacement  

E-Print Network [OSTI]

We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

Dale, Kevin

27

REQUEST FOR REPLACEMENT DIPLOMA Name: ________________________________________________________________________  

E-Print Network [OSTI]

REQUEST FOR REPLACEMENT DIPLOMA Name. ________________________________________________________________________ First Middle Maiden Last REPLACEMENT DIPLOMA INFORMATION Please print your name exactly as you want it to appear on your replacement diploma. If your name has changed since your degree was awarded, and if you

Gering, Jon C.

28

Replace / Renewal BUDGET ZZ106  

E-Print Network [OSTI]

Replace / Renewal BUDGET ZZ106 FUND: 126 CERTIFIED FOOD MANAGER CERTIFICATE RENEWAL Certificate Replacement Reason for Application: Replacement $15.00 Certificate Renewal Reason for Application: [Renewal application may be submitted up to 60 days prior to expiration.] Renewal - $10.00 Please Note: All

29

Enzyme replacement therapy for Pompe disease  

E-Print Network [OSTI]

CALIFORNIA, SAN DIEGO Enzyme Replacement Therapy for Pompe3 1.3 Enzyme Replacement Therapy for Pompe Disease 5Receptor ERT Enzyme Replacement Therapy LSD Lysosomal

Burris, Ryan Jonathan William

2010-01-01T23:59:59.000Z

30

Window Replacement, Rehabilitation, & Repair Guides - Building...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

31

Energy Replacement Generation Tax Exemption  

Broader source: Energy.gov [DOE]

Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax...

32

Virent is Replacing Crude Oil  

Broader source: Energy.gov [DOE]

Breakout Session 2AConversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

33

NACS Voice Mail Replacement Project  

E-Print Network [OSTI]

NACS Voice Mail Replacement Project Presented to the TPAG Monday, November 13, 2006 #12 criteria Integration with email is a key factor Taking a second look at Cisco & AVST Cost of Interactive

Brody, James P.

34

Buying Vs. Raising Replacement Heifers  

E-Print Network [OSTI]

When deciding on the best strategy for replacing heifers, beef cattle producers should weigh several factors. This publication discusses several such issues, including current and future market prices; herd size; pastures, facilities and management...

Cleere, Jason

2006-01-02T23:59:59.000Z

35

Anytime Replanning Using Local Subplan Replacement  

E-Print Network [OSTI]

Anytime Replanning Using Local Subplan Replacement A Dissertation Presented to the faculty how local subplan replacement can be utilized to implement an anytime planning system that devises new plans to accommodate plan failures. Local subplan replacement consists of selecting subsequences

Ferrer, Gabriel J.

36

Stanford University Mercury Thermometer Replacement  

E-Print Network [OSTI]

Stanford University Mercury Thermometer Replacement Program Instructions for Reuniting Separated Fluid Column of Non-Mercury Thermometer Heating Method Heat the thermometers bulb in an upright position of the thermometer. Note that over filling the expansion chamber will break the thermometer. Tap the thermometer

37

REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni  

E-Print Network [OSTI]

REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni: It is our understanding that you need to replace your original diploma. We are glad to help you attain a replacement diploma. The items listed below are required replacement diploma. Please feel free to contact the LGBT Center at 617-627-3770 if you have questions

Dennett, Daniel

38

Kittiwakes strategically reduce investment in replacement clutches  

E-Print Network [OSTI]

Kittiwakes strategically reduce investment in replacement clutches Julien Gasparini1,*, Alexandre). In birds, egg production is lower in replacement clutches than in first clutches, but it is unknown whether the replacement clutch is produced) or from a strategic allocation of resources between the two breeding attempts

Alvarez, Nadir

39

General Adaptive Replacement Policies Yannis Smaragdakis  

E-Print Network [OSTI]

General Adaptive Replacement Policies Yannis Smaragdakis College of Computing Georgia Institute of Technology yannis@cc.gatech.edu ABSTRACT We propose a general scheme for creating adaptive replace- ment any two existing replacement policies so that the resulting policy provably can never perform worse

Smaragdakis, Yannis

40

Cooperative Determination on Cache Replacement Candidates  

E-Print Network [OSTI]

Cooperative Determination on Cache Replacement Candidates for Transcoding Proxy Caching Keqiu Li1- mination on cache replacement candidates for transcoding proxies. An original model which determines cache replacement candidates on all can- didate nodes in a coordinated fashion with the objective of minimizing

Chin, Francis Y.L.

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Replacement Diploma Request University of Massachusetts Lowell  

E-Print Network [OSTI]

Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 883. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

Massachusetts at Lowell, University of

42

Cache Replacement Policy Revisited Mohamed Zahran  

E-Print Network [OSTI]

Cache Replacement Policy Revisited Mohamed Zahran Electrical Engineering Department City University of New York mzahran@ccny.cuny.edu Abstract Cache replacement policy is a major design parameter of any memory hierarchy. The efficiency of the replace- ment policy affects both the hit rate and the access la

Zahran, Mohamed M.

43

Article ID #eqr106 REPLACEMENT STRATEGIES  

E-Print Network [OSTI]

Article ID #eqr106 REPLACEMENT STRATEGIES Elmira Popova Associate Professor, Department)-296-5795 e-mail: popovai@seattleu.edu Corresponding Contributor: Elmira Popova Keywords: Replacement Policies define what is a replacement policy for a system that fails randomly in time and its main characteristics

Popova, Elmira

44

Replacement Diploma Request University of Massachusetts Lowell  

E-Print Network [OSTI]

Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 220. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

Massachusetts at Lowell, University of

45

Type-Logical Hyperedge Replacement Grammars  

E-Print Network [OSTI]

Type-Logical and Hyperedge Replacement Grammars Draft Richard Moot LaBRI (CNRS), INRIA Bordeaux SW2009 #12;CONTENTS 1 Introduction 1 2 Hyperedge Replacement Grammars 3 2.1 Hypergraphs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.2 Hyperedge Replacement . . . . . . . . . . . . . . . . . . . . . . . 4 2.3 Hyperedge

Paris-Sud XI, Université de

46

PeopleAdmin Staff Straight Replacement  

E-Print Network [OSTI]

1 PeopleAdmin ­ Staff Straight Replacement Guide #12;2 The staff straight replacement module will be used by hiring managers to request vacant, benefited positions be advertisedAdmin system, you will see this view. To begin the staff straight replacement process, you should click BEGIN

Hutcheon, James M.

47

Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions  

E-Print Network [OSTI]

Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions vessels to use non-qualifying vessels in the sector, thus allowing replacement of a lost qualifying vessel of the CRP ambiguous as to whether replacement of qualifying vessels with non-qualifying vessels

48

LED Replacements for Linear Fluorescent Lamps Webcast  

Broader source: Energy.gov [DOE]

In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

49

Optimal scheduling for replacing perimeter guarding unmanned ...  

E-Print Network [OSTI]

difference between charging batteries, automatically replacing batteries [11] or ... the discussion below to the use of batteries and battery charge, without loss of...

2014-08-20T23:59:59.000Z

50

Vehicle Technologies and Bus Fleet Replacement Optimization  

E-Print Network [OSTI]

1 Vehicle Technologies and Bus Fleet Replacement Optimization: problem properties and sensitivity: R41 #12;2 Abstract This research presents a bus fleet replacement optimization model to analyze hybrid and conventional diesel vehicles, are studied. Key variables affecting optimal bus type

Bertini, Robert L.

51

Page Replacement Algorithms To use a simulation for evaluating various page replacement algorithms studied in class.  

E-Print Network [OSTI]

Operating Systems CSI3131 Lab 4 Winter 2011 Page Replacement Algorithms Objective To use a simulation for evaluating various page replacement algorithms studied in class. Description (Please read to compare the performance of each page replacement algorithm. The constructor of this class contains

Stojmenovic, Ivan

52

Replacement solvents for use in chemical synthesis  

DOE Patents [OSTI]

Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

2001-05-15T23:59:59.000Z

53

Organic agriculture cannot replace conventional agriculture  

E-Print Network [OSTI]

Organic agriculture cannot replace conventional agriculture Sina Adl , David Iron and Theodore Agriculture | Pathogen Dispersal Introduction Organic farming [1, 2] is gaining in popularity in Eu- rope, because or- ganic agriculture avoids using environmentally harmful chem- icals that pollute soil

Kolokolnikov, Theodore

54

Marin County- Wood Stove Replacement Rebate Program  

Broader source: Energy.gov [DOE]

The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

55

Beyond the Replacement Paradigm: Smart Lighting  

E-Print Network [OSTI]

Switches Smart Building & Grid Interfaces Efficient full spectrum LEDs without droop Versatile, low - Visible Light Communications Integration of smart fixtures, networked sensors and control systemsBeyond the Replacement Paradigm: Smart Lighting Robert F. Karlicek, Jr. Director, Smart Lighting

Salama, Khaled

56

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

57

Evaluation of alternative sign replacement strategies  

E-Print Network [OSTI]

replacement procedure at the time the new standards go into effect. This will ensure that material, manpower, and other expenditures are minimized, resulting in an overall benefit to TXDOT. Based on this review and analysis, it is recommended that TXDOT...

McCaleb, James Bradley

1996-01-01T23:59:59.000Z

58

A replaceable reflective film for solar concentrators  

SciTech Connect (OSTI)

The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

Not Available

1991-09-01T23:59:59.000Z

59

LONG TERM FILE MIGRATION - PART II: FILE REPLACEMENT ALGORITHMS  

E-Print Network [OSTI]

MIGRATION PART II: FILE REPLACEMENT ALGORITHMS Alan Jaymay vary even though replacement fi~~d the pa~ameter value PIe N - P ;, RT I r:. fILE REPLACEMENT ALGORITHMS. I.lan ~1ar

Jay Smith, Alan

2011-01-01T23:59:59.000Z

60

REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student Number: _________________________  

E-Print Network [OSTI]

REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student: _________________________ Cheque Date: _____________________ CHEQUE AMOUNT: ________________________ REASON FOR REPLACEMENT Building at the address below. Please indicate how you would like to receive your replacement cheque

Sinnamon, Gordon J.

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars  

E-Print Network [OSTI]

Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars Richard Moot La (tree generating) hyperedge replacement grammars as an intermediate step. As a consequence both, using hyperedge replacement grammars as an intermediate step. 2 Tree Adjoining Grammars and Hyperedge

Paris-Sud XI, Université de

62

Quenching and Partitioning Process Development to Replace Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Quenching and Partitioning Process Development to Replace Hot Stamping of...

63

Magnesium Replacement of Aluminum Cast Components in a Production...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Magnesium Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a...

64

Effects of an Accelerated Diesel Engine Replacement/Retrofit Program  

E-Print Network [OSTI]

No. 894 Effects of an Accelerated Diesel Engine Replacement/2009 Effects of an Accelerated Diesel Engine Replacement/reductions occurring on an accelerated schedule compared to

Millstein, Dev E.; Harley, Robert A

2009-01-01T23:59:59.000Z

65

Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This...

66

Valve assembly having remotely replaceable bearings  

DOE Patents [OSTI]

A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings.

Johnson, Evan R. (San Diego, CA); Tanner, David E. (Poway, CA)

1980-01-01T23:59:59.000Z

67

The Ringhals 2 steam generator replacement  

SciTech Connect (OSTI)

Righals 2, located on the west coast of Sweden and operated by Vattenfall (Swedish State Power), is a Westinghouse 800-MW three-loop pressurized water reactor that started commercial operation in 1975. In 1983, a task force was assigned to make a study of the steam generator (SG) tube corrosion problems, mainly stress corrosion cracking in the tubesheet area, which caused between two and three unscheduled outages each year. The task force study concluded that replacement was clearly the best of the three alternatives considered. Late in 1984, a decision was made to replace the SG in the summer of 1989. It was also decided to take advantage of existing margins in the plant by increasing the heat transfer area of the new SG. A power increase of 9% would then be possible by fairly moderate modifications of the turbine plant. The SG replacement project was on time, below budget, and much below dose budget. As a consequence of the 9% uprating, the cost of the SG replacement will be recovered after 3 to 4 yr.

Looft, H.

1990-06-01T23:59:59.000Z

68

Measure Guideline: Window Repair, Rehabilitation, and Replacement  

SciTech Connect (OSTI)

This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

Baker, P.

2012-12-01T23:59:59.000Z

69

Reversing Wolbachia-based population replacement  

E-Print Network [OSTI]

Wolbachia bacteria as a vehicle for population replace- ment. Also discussed are strategies strategies and provide mechan- isms for the autonomous spread of desired transgenes into the targeted relative to the natural population [15­17]. Primary candidates for gene-drive strategies are autonomous

Dobson, Stephen L.

70

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK!  

E-Print Network [OSTI]

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK! Did you know, mercury from broken thermometers to the local environment, if broken thermometers in sinks eventually end at the sanitary sewer plant. Broken mercury thermometers create hazardous waste that is costly to clean up and costly to dispose of. Other

71

THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES  

E-Print Network [OSTI]

THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES JOSEPH PREVITE, MICHELLE PREVITE, AND MARY a vertex replacement rule given by exactly one replacement graph generates an infinite graph for the growth degree of infinite graphs with polynomial growth that are gener- ated by vertex replacement rules

Previte, Joseph P.

72

Orthopaedic Surgery Center of Joint Preservation and Replacement  

E-Print Network [OSTI]

Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Hip Replacement new hip! You are going home after a successful total hip replacement. Although there is still much. The benefits of a total hip replacement are great, but they do take a while to be realized. Hip Precautions

Oliver, Douglas L.

73

Orthopaedic Surgery Center of Joint Preservation and Replacement  

E-Print Network [OSTI]

Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Knee Replacement are going home after a successful total knee replacement. Although there is still much work to do, we have replacement are great, but they do take a while to be realized. We have put together some helpful hints

Oliver, Douglas L.

74

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...  

Energy Savers [EERE]

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems May 1, 2014 - 9:33am...

75

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network [OSTI]

end users to select the most energy efficient equipment when replacing motors, motor drives, transformers, lamps, ballasts, etc., given costs associated with energy consumption when compared with installation. The selection of replacement parts...

Massey, G. W.

2005-01-01T23:59:59.000Z

76

Replaces DOE F 5120.2  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement of50.2700.2

77

Replacing PG and E's Milpitas terminal  

SciTech Connect (OSTI)

This paper reports that Pacific Gas and Electric Co.'s Milpitas Terminal was originally built in 1929, when natural gas was first brought to the San Francisco Bay Area from the Kettleman Hills gas fields. This paper reports that in 1985, a project was begun to replace the old terminal due to maintenance problems, odor complaints and unaccounted-for gas due to poor measurement quality. The location of the terminal was also a problem. A proposed highway expansion would encroach into the yard area where the existing pipeline was located. In addition, the original location was in agricultural lands, which was changing to commercial use.

Rawcliffe, R.S.; Maceyka, R.A. (Pacific Gas and Electric Co., San Francisco, CA (US))

1991-07-01T23:59:59.000Z

78

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

79

The opportunistic replacement problem: analysis and case studies  

E-Print Network [OSTI]

Jan 22, 2009 ... Abstract: We consider an optimization model for determining optimal opportunistic maintenance (that is, component replacement) schedules...

Torgny Almgren

2009-01-22T23:59:59.000Z

80

Computer Replacement Guidelines Environmental Health and Safety, Stanford University  

E-Print Network [OSTI]

Computer Replacement Guidelines Environmental Health and Safety, Stanford University 17 November 2005 This document describes the guidelines for replacing laptop and desktop computers at Environmental Health and Safety. PC laptop and desktop computers will be replaced a) on an ongoing basis where

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1  

E-Print Network [OSTI]

Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1 , Lawrence B. Holder2 , and Diane J@eecs.wsu.edu Abstract We describe an algorithm and experiments for inference of edge replacement graph grammars for inference of Node Replacement Recursive Graph Grammars [7]. In this paper we describe an approach

Holder, Lawrence B.

82

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

1 FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; 2 L'ECUYER, MARTIN, AND V ' AZQUEZ

L'Ecuyer, Pierre

83

1 INTRODUCTION The replacement investment decision is clearly a  

E-Print Network [OSTI]

1 INTRODUCTION The replacement investment decision is clearly a strategic objective of a company for the replacement decision largely depends on the company context. However, we can summarize the motivations leading over time and prove that the replacement policy at equal intervals is optimum. However, the linear

Paris-Sud XI, Université de

84

Application for Amendment 80 Vessel Replacement Page 1 of 6  

E-Print Network [OSTI]

Application for Amendment 80 Vessel Replacement Page 1 of 6 Revised: 12/23/2013 OMB Control No. 0648-0565 Expiration Date: 01/31/2016 APPLICATION FOR AMENDMENT 80 VESSEL REPLACEMENT United States OF THE AMENDMENT 80 VESSEL BEING REPLACED 1. Vessel Name: 2. ADF&G Vessel Registration No.: 3. USCG Documentation

85

Page Replacement and Reference Bit Emulation in Mach  

E-Print Network [OSTI]

Page Replacement and Reference Bit Emulation in Mach Richard P. Draves rpd@cs.cmu.edu School of Computer Science Carnegie Mellon University 5000 Forbes Avenue Pittsburgh, PA 15213 Abstract A page­replacement in software. This paper describes the Mach kernel's page­replacement algorithm and considers three software

86

The Cosmic Origins Spectrograph: A Hubble Replacement Instrument  

E-Print Network [OSTI]

The Cosmic Origins Spectrograph: A Hubble Replacement Instrument for the 2002 Reservicing Mission Origins Spectrograph (COS) has recently been selected as a replacement instrument for the Hubble Space Telescope. Installation is scheduled for late 2002, replacing COSTAR, which at that time will be unnecessary

Colorado at Boulder, University of

87

Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY  

E-Print Network [OSTI]

Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY Updated: 08/26/09 Use this form to request a replacement or additional diploma. · The name on your diploma must be the same the Registrar's Office, Registration and Records Division prior to requesting your replacement diploma

Feschotte, Cedric

88

Cache Replacement Policy Using Map-based Adaptive Insertion  

E-Print Network [OSTI]

Cache Replacement Policy Using Map-based Adaptive Insertion Yasuo Ishii The University of Tokyo insertion policy (MAIP) for a novel cache replacement. The MAIP estimates the data reuse possibility policy. 1. INTRODUCTION The cache replacement policy plays an important role in improving system

Paris-Sud XI, Université de

89

University of Utah Payroll Department Stop Payment -Replacement Form  

E-Print Network [OSTI]

University of Utah Payroll Department Stop Payment - Replacement Form Affidavit to request replacement of a lost, stolen, or damaged, payroll check. Please note that it takes 5 to 7 days to process is given to induce a replacement check for one originally issued. 3. I agree to indemnify and hold

Provancher, William

90

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; L'ECUYER, MARTIN, AND V ' AZQUEZ

Vázquez-Abad, Felisa J.

91

Node discovery and replacement using mobile Kalypso Magklara1  

E-Print Network [OSTI]

Node discovery and replacement using mobile robot Kalypso Magklara1 , Dimitrios Zorbas1 and Tahiry, that discovers the nodes around it and replaces the active nodes, whose energy is drained, by fully charged and that decide, which nodes to replace. We simulate our algorithms and our findings show that all nodes that fail

Paris-Sud XI, Université de

92

REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE  

E-Print Network [OSTI]

REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE Administration Building, Room 110-3169 The replacement diploma will bear the signatures of the current University President and Registrar and have the words Replacement Diploma printed under the university seal. Allow 3-4 weeks for delivery. You

Barrash, Warren

93

Application for Replacement JCU Award (Certificate/Testamur) -FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD  

E-Print Network [OSTI]

Application for Replacement JCU Award (Certificate/Testamur) - FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD (CERTIFICATE/TESTAMUR) 1. PERSONAL DETAILS JCU Student Number (8 digits): Title: rDr r after the fee is paid. · Replacement Testamurs - $70 (Diploma, Bachelor, Master and Doctoral

94

Application Form for Replacement Diploma/Program Certificate (Form must be notarized)  

E-Print Network [OSTI]

Application Form for Replacement Diploma/Program Certificate (Form must be notarized) Complete to Princeton University as follows: Replacement Diploma - $75 Replacement Program Certificate - $30 Please

95

Replacement of the Advanced Test Reactor control room  

SciTech Connect (OSTI)

The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab.

Durney, J.L.; Klingler, W.B. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

1989-01-01T23:59:59.000Z

96

arthroplasty replacement: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Replacement of the target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is...

97

androgen replacement therapy: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 153 LATTICE PATHS, SAMPLING...

98

arthroplasty replacement hip: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 144 LATTICE PATHS, SAMPLING...

99

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...  

Broader source: Energy.gov (indexed) [DOE]

Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

100

Heavy-Duty Natural Gas Drayage Truck Replacement Program  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Heavy-Duty Natural Gas Drayage Truck Replacement Program Principal Investigator: Vicki White South Coast Air Quality Management District May 16, 2012 Project ID ARRAVT045 This...

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

New Feedstocks and Replacement Fuels - Future Energy for Mobility...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuels - Future Energy for Mobility New Feedstocks and Replacement Fuels - Future Energy for Mobility Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan....

102

New Feedstocks and Replacement Fuel Diesel Engine Challenges...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Diesel Engine Challenges New Feedstocks and Replacement Fuel Diesel Engine Challenges Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the...

103

Quenching and Partitioning Process Development to Replace Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quenching and Partitioning Process ADVANCED MANUFACTURING OFFICE Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Novel...

104

FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART 1.  

E-Print Network [OSTI]

FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART F. McDONOUGH*** ABSTRACT. Replacement dolomite in the Latemar carbonate buildup, northern Italy of vertical columns (replacement of limestone breccia pipes) and sheets (replacement along fractures

Carmichael, Sarah

105

Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication  

SciTech Connect (OSTI)

A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

Megan Donahue

2009-02-24T23:59:59.000Z

106

CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING  

E-Print Network [OSTI]

CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING Authors: James H Hines (MIT changes are needed. The paper describes an extensive experiment with using this approach to construct with another molecule. Using this tool kit, users can rapidly construct new simulation models by replacing

107

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS  

E-Print Network [OSTI]

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after

Cizelj, Leon

108

Milling Machine Replacement Project (4587), 5/11/2012  

Broader source: Energy.gov (indexed) [DOE]

by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital...

109

Drop-in replacement biofuels : meeting the challenge  

E-Print Network [OSTI]

This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

Bhargava, Alok (Alok Kishore)

2011-01-01T23:59:59.000Z

110

EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

111

Washington State Department of Ecology: Replacement Wells Requiring...  

Open Energy Info (EERE)

Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

112

Laboratory Evaluation of LED T8 Replacement Lamp Products  

SciTech Connect (OSTI)

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

113

Ultrasound image guided acetabular implant orientation during total hip replacement  

DOE Patents [OSTI]

A system for assisting in precise location of the acetabular implant during total hip replacement. The system uses ultrasound imaging for guiding the placement and orientation of the implant.

Chang, John; Haddad, Waleed; Kluiwstra, Jan-Ulco; Matthews, Dennis; Trauner, Kenneth

2003-08-19T23:59:59.000Z

114

Replace Pressure-Reducing Valves with Backpressure Turbogenerators  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

115

Developing a total replacement cost index for suburban office projects  

E-Print Network [OSTI]

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

116

Replacing Motors Counting Savings: Results from a 100 Motor Study  

E-Print Network [OSTI]

REPLACING MOTORS, COUNTING SAVINGS: RESULTS FROM A 100 MOTOR STUDY Nicole M. Kaufman Motor Systems Engineer Advanced Energy Raleigh, NC ABSTRACT Software tools such as MotorMaster+ aid facility personnel in conducting payback... analyses for replacing motors. These tools make assumptions on the motors operational efficiency in their calculations. By observing 100 pre-EPCA (Energy Policy & Conservation Act) motors in operation, removing them from service and conducting IEEE...

Kaufman, N. M.

2006-01-01T23:59:59.000Z

117

Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each  

E-Print Network [OSTI]

Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each replacement diploma is $25.00 ($35.00 for D.M.D, J.D., LL.M., and M.D). Please fill out the applicable information and mail it to the address below. Replacement

Guenther, Frank

118

Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2  

E-Print Network [OSTI]

Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2 1 Carl v. Ossietzky. TAGT'98, Universitat-GH Paderborn, 182-189, 1998. Node replacement and hyperedge replacement are two, we combine both concepts to a concept of atom replacement that allows the replacement of the atomic

Habel, Annegret

119

Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles  

E-Print Network [OSTI]

Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles replacement cycles are commonly observed in tropical cyclones and are well known to cause fluctuations associated with eyewall replacement cycles in Atlantic Ocean hurricanes. The model input comprises

Kossin, James P.

120

Functional replacement of a primary metabolic pathway via multiple independent eukaryote-to-eukaryote gene transfers  

E-Print Network [OSTI]

Functional replacement of a primary metabolic pathway via multiple independent eukaryote can be added to the recipient's gene complement (gene additions) or simply replace existing endogenous counterparts (functional replacements). The recruitment of novel genes is thought to allow the recipient

Nedelcu, Aurora M.

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Microstructure, Mechanical Behavior, and Clinical Trade-offs in Ultra-High Molecular Weight Polyethylene for Total Joint Replacement  

E-Print Network [OSTI]

components for total joint replacement. J Bone Joint Surgcontemporary total knee replacements. Clin Orthop Relat Res(wear in total joint replacement? J Am Acad Orthop Surg, 16

Atwood, Sara Anne

2010-01-01T23:59:59.000Z

122

Replacing the whole barrel of oil with plants and microbes  

SciTech Connect (OSTI)

In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

Simmons, Blake

2013-05-29T23:59:59.000Z

123

New energy replacement method for resonant power supplies  

SciTech Connect (OSTI)

The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab.

Karady, G.G.; Thiessen, H.A.

1989-01-01T23:59:59.000Z

124

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

125

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

126

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect (OSTI)

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

127

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?  

E-Print Network [OSTI]

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories? N. D. Finkelstein, K, Boulder Abstract. This paper examines the effects of substituting computer simulations in place of real (DC) circuit laboratory was modified to compare the effects of using computer simulations

Colorado at Boulder, University of

128

Replacing the whole barrel of oil with plants and microbes  

ScienceCinema (OSTI)

In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

Simmons, Blake

2014-06-24T23:59:59.000Z

129

Data Mining For Prediction of Aircraft Component Replacement  

E-Print Network [OSTI]

Data Mining For Prediction of Aircraft Component Replacement Sylvain Letourneau1 Fazel Famili1 Stan the number of delays, and increasing the overall level of safety. Several data mining techniques exist from the data obtained during the operation and maintenance of aircraft is extremely challenging. Di

Matwin, Stan

130

Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures  

E-Print Network [OSTI]

Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures Diego R discuss the behavior of the replacement mechanism of well-known COMA protocols applied to a loosely replacement mecha- nism in order to select the destination node of a replacement transaction without

Llanos, Diego R.

131

Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2  

E-Print Network [OSTI]

1 Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2 3.1016/j.jcrysgro.2012.02.040 #12;2 Abstract16 Olivine mineral replacement by serpentine is one major replaced by18 chrysotile and brucite under high alkaline conditions. In our study, olivine replacement19

Paris-Sud XI, Université de

132

University of South Carolina Office of the University Registrar Request for Replacement Diploma  

E-Print Network [OSTI]

University of South Carolina Office of the University Registrar P F Request for Replacement Diploma Please Note Replacement diplomas are duplicates of the original diploma issued by USC. A request on the replacement diploma will reflect those of the current University Officers. Replacements can take up to 90 days

Almor, Amit

133

Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement  

E-Print Network [OSTI]

Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement for the replacement of pulmonary heart valves. This technique is a minimally invasive alternative to the replacement on known causes for insufficiencies of transcutaneous heart valve replacements. Out of that information

Berlin,Technische Universität

134

Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25, 2012)  

E-Print Network [OSTI]

Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25 or Replacement of an Investigator's Brochure or Product Monograph This form replaces a letter of explanation from or replacement of an Investigator's Brochure Page 2 of 2 (Version: January 25, 2012) 5) List all forms

Shoubridge, Eric

135

Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and  

E-Print Network [OSTI]

Page | 1 Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and return this form to Examinations students You will not be charged for this service. A replacement transcript can be supplied

Neirotti, Juan Pablo

136

Stochastic Ratchet Mechanisms for Replacement of Proteins Bound to DNA  

E-Print Network [OSTI]

Experiments indicate that unbinding rates of proteins from DNA can depend on the concentration of proteins in nearby solution. Here we present a theory of multi-step replacement of DNA-bound proteins by solution-phase proteins. For four different kinetic scenarios we calculate the depen- dence of protein unbinding and replacement rates on solution protein concentration. We find (1) strong effects of progressive 'rezipping' of the solution-phase protein onto DNA sites liberated by 'unzipping' of the originally bound protein; (2) that a model in which solution-phase proteins bind non-specifically to DNA can describe experiments on exchanges between the non specific DNA- binding proteins Fis-Fis and Fis-HU; (3) that a binding specific model describes experiments on the exchange of CueR proteins on specific binding sites.

Simona Cocco; John F. Marko; Remi Monasson

2014-05-26T23:59:59.000Z

137

OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement  

Broader source: Energy.gov [DOE]

With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

138

Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement  

SciTech Connect (OSTI)

This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

Springer, D.; Dakin, B.

2013-03-01T23:59:59.000Z

139

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

140

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

The National Energy Policy Act and lamp replacement options  

SciTech Connect (OSTI)

The National Policy Act of 1992 involves the creation of energy efficiency standards for a wide range of products including fluorescent and incandescent lamps. Minimum efficacy (lumens per watt) and color rendering index (CRI) standards are mandated for the popular fluorescent lamps: four-foot medium bi-pin, two-foot U-bent, eight-foot slimline and eight-foot high output. Minimum efficacies are mandated for specific incandescent R and PAR reflector lamps. These standards will affect selected colors and designs of fluorescent lamps, the most significant being the standard lamps in the cool white and warm white colors. The incandescent reflector lamps will include the R-30, R-40, PAR-38 lamps above 40 watts, excluding the halogen types. These efficiency and color rendering standards will require end-users and specifiers to select replacement fluorescent lamps from a range of performance characteristics (lumen output, efficacy, CRI and price). The choice of replacement for the R and PAR incandescent lamps will include the halogen designs and compact fluorescent designs. In this paper, replacement options will be analyzed and discussed and the effect of these options on the performance of the lighting system will be explored in detail.

Ryerson, C.

1995-06-01T23:59:59.000Z

142

A Centrifugal Contactor Design to Facilitate Remote Replacement  

SciTech Connect (OSTI)

Advanced designs of nuclear fuel recycling and radioactive waste treatment plants are expected to include more ambitious goals for solvent extraction based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, Annular Centrifugal Contactors (ACCs) are destined to play a more important role for such future processing schemes. This work continues the development of remote designs for ACCs that can process the large throughputs needed for future nuclear fuel recycling and radioactive waste treatment plants. A three stage, 12.5 cm diameter rotor module has been constructed and is being evaluated for use in highly radioactive environments. This prototype assembly employs three standard CINC V-05 clean-in-place (CIP) units modified for remote service and replacement via new methods of connection for solution inlets, outlets, drain and CIP. Hydraulic testing and functional checks were successfully conducted and then the prototype was evaluated for remote handling and maintenance. Removal and replacement of the center position V-05R contactor in the three stage assembly was demonstrated using an overhead rail mounted PaR manipulator. Initial evaluation indicates a viable new design for interconnecting and cleaning individual stages while retaining the benefits of commercially reliable ACC equipment. Replacement of a single stage via remote manipulators and tools is estimated to take about 30 minutes, perhaps fast enough to support a contactor change without loss of process equilibrium. The design presented in this work is scalable to commercial ACC models from V-05 to V-20 with total throughput rates ranging from 20 to 650 liters per minute.

David H. Meikrantz; Jack. D. Law; Troy G. Garn; Lawrence L. Macaluso

2011-03-01T23:59:59.000Z

143

Overview of CFC replacement issues for household refrigeration  

SciTech Connect (OSTI)

In 1974, the famous ozone depletion theory of Rowland and Molina claimed that chlorofluorocarbons (CFCs) diffuse into the stratosphere where they are broken down by photolysis to release chlorine atoms that catalytically destroy ozone. Although the understanding of the science is still imperfect, there is little doubt that CFCs play a major role in the Antarctic ozone hole phenomenon and the decline in ozone observed in the rest of the world. Another issue that has become increasingly important is the potential of CFCs to change the earth`s temperature and to modify the climate. While the main impact in global warming is made by increased concentrations of carbon dioxide, CFCs and other trace gases also contribute to this effect. In an effort to respond to the global environmental threat, a CFC protocol was adopted during a diplomatic conference in Montreal. This document, known as the Montreal Protocol, was ratified in 1988 and put into effect on January 1, 1989. In accordance with Article 6 of the Montreal Protocol, the countries that signed the agreement shall periodically assess the control measures provided for in the Protocol. As part of that assessment process, household refrigeration was investigated to determine the status of CFC-12 replacements. The conclusion was that much progress has been made towards finding a suitable replacement. Compressors designed for HFC-134a have efficiencies comparable to those for CFC-12 and acceptable reliability tests have been obtained with ester lubricants. In addition, other replacements such as R-152a and refrigerant mixtures exist, but will require more study. Cycle options, such as the Stirling cycle, may be viable, but are further out in the future. The impact of new refrigerants is expected to result in elimination of CFC-12 consumption in developed countries by 1997 and in developing countries by 2005.

Vineyard, E.A. [Oak Ridge National Lab., TN (United States); Roke, L. [Fisher and Paykel, Auckland (New Zealand); Hallett, F. [Frigidaire, Washington, DC (United States)

1991-12-31T23:59:59.000Z

144

For Immediate Release --Wednesday, July 4, 2012 Water Pipe Replacement Closes Three Campus Buildings, July  

E-Print Network [OSTI]

1 For Immediate Release -- Wednesday, July 4, 2012 Water Pipe Replacement water supply pipe as well as building isolation valves. The main water to happen again. The pipe replacement is part of a $5.6 million upgrade

Morris, Joy

145

Geography Access Control / Identification Application Application Type: New Update/Addition Replacement Temporary  

E-Print Network [OSTI]

/Addition Replacement Temporary The following is to be completed by the employee (type or print legibly): Last name _____________________ $15 Access & Identification, $10 Identification Card only, $10 replacement fee for either Affiliation

California at Santa Barbara, University of

146

Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project  

SciTech Connect (OSTI)

CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-04T23:59:59.000Z

147

Embryo collection and attempted replacement in the mare  

E-Print Network [OSTI]

embryo collections, was similar to that described by Oguri and Tsutsumi (1980). An 18 gauge Foley 3-way catheter with a 75 cc balloon (Bardex, Bard Hospital Division, C. R. Bard Inc. , Murray Hill, New Jersey) was introduced into the vagina by hand... (Member) J. D. McCrady (Head of Department) August 1983 ABSTRACT Embryo Collection and Attempted Replacement in the Mare (August, 1983) Jane S, Beach, B. S. , Texas A&M University Chairman of advisory committee: Dr. Duane C. Kraemer Embryos were...

Beach, Jane Salisbury

1983-01-01T23:59:59.000Z

148

RandomString is a small web application, containing one java servlet. It allows users to enter a list of strings to be randomly chosen with two options: with replacement or without replacement (default).  

E-Print Network [OSTI]

a list of strings to be randomly chosen with two options: with replacement or without replacement of strings and choosing them randomly with two options: with replacement or without replacement (default strings are separated by carriage return. 2. User selects to randomly choose strings `without replacement

Offutt, Jeff

149

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA  

E-Print Network [OSTI]

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

150

Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1;3 .  

E-Print Network [OSTI]

Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1@zenone.math.unipd.it, cocco@moo.dsi.unive.it, etalle@cwi.nl October 13, 1994 Abstract The simultaneous replacement results for Fitting's and Kunen's semantics. We also show how simultaneous replacement can mimic other

Cocco, Nicoletta

151

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions  

E-Print Network [OSTI]

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain Available online 8 March 2012 Keywords: A1. Mineral replacement rate A1. Serpentinization A1. TG analyses B1. Alkaline medium B2. Chrysotile nanotubes a b s t r a c t Olivine mineral replacement by serpentine is one

Montes-Hernandez, German

152

Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jimenez  

E-Print Network [OSTI]

Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jim´enez Department of Computer Science The University of Texas at San Antonio Abstract We present a cache replacement and bypass policy driven by dead block prediction. A block is considered dead is it will be replaced before

Paris-Sud XI, Université de

153

evolution via the replacement of two-membrane plastids would have to be  

E-Print Network [OSTI]

evolution via the replacement of two- membrane plastids would have to be accompanied by the origin be easily overcome by assuming that four-membrane plastids have evolved via the replacement of three-membrane plastids would be an example of a secondary (replacement of a prokaryotic by a eukaryotic plastid

McFadden, Geoff

154

Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view  

E-Print Network [OSTI]

Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view-cache replacement policy can be modified for self- performance to be meaningful. Categories and Subject Descriptors multicore processor, quality of service, self-per- formance, shared cache, replacement policy, memory band

Paris-Sud XI, Université de

155

Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT  

E-Print Network [OSTI]

Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT PAGE 1 OF 1, NOVEMBER 2013 REQUEST FOR GRADUATE DIPLOMA REPLACEMENT/REPRINT Return your completed form to: Graduate School Graduate of the replacement diploma. Current graduate diplomas measure 11" by 14". Your diploma will be printed with the legal

Buehrer, R. Michael

156

Biased Replacement Policies for Web Caches: Differential QualityofService and Aggregate User Value \\Lambda  

E-Print Network [OSTI]

Biased Replacement Policies for Web Caches: Differential Quality­of­Service and Aggregate User reduction to different degrees, a replacement policy which priori­ tizes cache space across servers can­frequently­used (LFU) replacement that is sensitive to varying levels of server valuation for cache hits. Through trace

Jamin, Sugih

157

STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM  

E-Print Network [OSTI]

STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-4R TESTING CF-4R-MECH-20 Duct Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site, and also for completely new or replacement duct systems in existing dwellings. For existing dwellings

158

Image-Based Texture Replacement Using Multiview Images Technion Israel Inst. of Technology  

E-Print Network [OSTI]

Image-Based Texture Replacement Using Multiview Images Doron Tal Technion ­ Israel Inst replacement is one such task. It is the process of painting a new texture over an ex- isting textured image for perform- ing texture replacement, which is based on multiview stereo tech- niques that produce depth

Tal, Ayellet

159

Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement  

E-Print Network [OSTI]

100 Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement Dipnil replacement. The purpose of this study was to use computer simulation to study the effects of resecting too-tissue tensions, and articular contact forces. INTRODUCTION Total knee replacement (TKR) is a reliable and widely

Omiecinski, Curtis

160

Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart  

E-Print Network [OSTI]

Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart Department of Computer Science University of Illinois at Urbana­Champaign Figure 1: Replaced materials replacement has wide application through- out the entertainment industry, particularly for post- production

Garland, Michael

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement  

E-Print Network [OSTI]

Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement replacement may out-perform prior-specific training in some aspects of the quality of the estimated posterior, since the prior is known analytically, the posterior can also be estimated by prior replacement. To do

162

Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W. Weide  

E-Print Network [OSTI]

Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W nsridhar,pike,weide @cis.ohio-state.edu Abstract Dynamic module replacement -- the ability to hot swap-neutral technique for dynamic module replacement using Service Facilities (Serfs) -- a pattern- based design

Weide, Bruce W.

163

Replacement Diploma Name Change Office of Records and Registration rev. 06/11  

E-Print Network [OSTI]

Replacement Diploma Name Change Office of Records and Registration rev. 06/11 Clemson University will provide a replacement or additional diploma to graduates of the University for a fee of $50.00 per diploma. Replacement and additional diplomas are printed on paper stock being used by the University at the time

Bolding, M. Chad

164

Application for a Replacement Testamur ADM18-V02/14  

E-Print Network [OSTI]

Application for a Replacement Testamur ADM18-V02/14 RECEIVED Please retain this copy as proof an institution that has amalgamated with Monash University may apply for a replacement testamur if their original the application form. Damaged: If you require a replacement testamur because your original testamur is damaged, we

Albrecht, David

165

ON THE LINEAR GROWTH OF THE SPLITANDMERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

ON THE LINEAR GROWTH OF THE SPLIT­AND­MERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT Functional estimation, split­and­merge tree, opti­ mization, maintenance models, age replacement poli­ cies Abstract We a consider a replacement policy based on age thresholds, for a multicomponent system. We want

Vázquez-Abad, Felisa J.

166

Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement Project  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement the current taphole replacement problem Use advanced decision-making tools to select an optimal concept to be manufactured An SOP was created that standardized the taphole replacement process and reduced overall

Demirel, Melik C.

167

Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton  

E-Print Network [OSTI]

Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton Shan and was replaced by more fertile lithospheric mantle sometime after the Paleozoic. Moreover, lithospheric mantle crust (2700 Ma), suggesting that the original Archean lithosphere was replaced in the Proterozoic

Rudnick, Roberta L.

168

Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks  

E-Print Network [OSTI]

1 Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks Sachin the sensing coverage falls below the minimum threshold-coverage. We develop three node-replacement policies failed sensor node for replacement. Based on different performance criteria, every time a sensor node

Vokkarane, Vinod M.

169

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network  

E-Print Network [OSTI]

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network dynamically. Most existing cache strategies perform replacement independently, and they seldom consider coordinated replacement and energy saving issues in the context of a mobile ad hoc network. In this paper, we

Chan, Edward

170

STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM  

E-Print Network [OSTI]

STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-6R Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site Address: Enforcement Agency new or replacement duct systems in existing dwellings. For existing dwellings, a completely new

171

Shake them all! Rethinking Selection and Replacement in MOEA/D  

E-Print Network [OSTI]

Shake them all! Rethinking Selection and Replacement in MOEA/D Gauvain Marquet Bilel Derbel Arnaud-specific operators, and (iii) replace neighbors' solutions if the generated offspring is better. We remark is critical for an accurate explo- ration/exploitation balance. Moreover, the replacement mechanism (Step (iii

Paris-Sud XI, Université de

172

Nuclear criticality safety assessment of the proposed CFC replacement coolants  

SciTech Connect (OSTI)

The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

Jordan, W.C.; Dyer, H.R.

1993-12-01T23:59:59.000Z

173

DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF  

SciTech Connect (OSTI)

The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

Krementz, D.; Coughlin, Jeffrey

2009-05-05T23:59:59.000Z

174

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device for a device that has been lost or stolen. Use and  

E-Print Network [OSTI]

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device as those explained in the original Fuel Device Application and for your convenience provided on this form Information Lost Stolen Unknown Date of last known use Certification of Use I certify that fuel access device

Kirschner, Denise

175

Experimental Results on Statistical Approaches to Page Replacement Policies  

SciTech Connect (OSTI)

This paper investigates the questions of what statistical information about a memory request sequence is useful to have in making page replacement decisions: Our starting point is the Markov Request Model for page request sequences. Although the utility of modeling page request sequences by the Markov model has been recently put into doubt, we find that two previously suggested algorithms (Maximum Hitting Time and Dominating Distribution) which are based on the Markov model work well on the trace data used in this study. Interestingly, both of these algorithms perform equally well despite the fact that the theoretical results for these two algorithms differ dramatically. We then develop succinct characteristics of memory access patterns in an attempt to approximate the simpler of the two algorithms. Finally, we investigate how to collect these characteristics in an online manner in order to have a purely online algorithm.

LEUNG,VITUS J.; IRANI,SANDY

2000-12-08T23:59:59.000Z

176

Chlorinated solvent replacements recycle/recovery review report  

SciTech Connect (OSTI)

This report is a literature review of waste solvents recycle/recovery methods and shows the results of solvent separations using membrane and distillation technologies. The experimental solvent recovery methods were conducted on solvent replacements for chlorinated solvents at Montana State University. The literature review covers waste solvents separation using distillation, membranes decantation, filtration, carbon adsorption, solvent extraction, and other vapor-phase separation techniques. The results of this study identify solvent distillation methods as the most common separation technique. The alternative separation methods typically supplement distillation. The study shows the need for industries to identify waste solvent disposal methods and investigate the economics of waste solvent recycling as a possible waste reduction method.

Beal, M.; Hsu, D.; McAtee, R.E.; Weidner, J.R. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Berg, L.; McCandless, F.P.; Waltari, S.; Peterson, C. [Montana State Univ., Bozeman, MT (United States). Dept. of Chemical Engineering

1992-08-01T23:59:59.000Z

177

Selecting renal replacement therapies: what do African American and non-African American patients and their families think others should know? A mixed methods study  

E-Print Network [OSTI]

making about renal replacement therapies. Qual Health ResOpen Access Selecting renal replacement therapies: what doneed to inform renal replacement therapy (RRT) decisions.

2013-01-01T23:59:59.000Z

178

Replacement of Mushroom Cage Gastrostomy Tube Using a Modified Technique to Allow Percutaneous Replacement with an Endoscopic Tube in Patients with Amyotrophic Lateral Sclerosis  

SciTech Connect (OSTI)

Radiologic inserted gastrostomy (RIG) is the preferred method in our institution for enteral feeding in amyotrophic lateral sclerosis (ALS). Skin-level primary-placed mushroom cage gastrostomy tubes become tight with weight gain. We describe a minimally invasive radiologic technique for replacing mushroom gastrostomy tubes with endoscopic mushroom cage tubes in ALS. All patients with ALS who underwent replacement of a RIG tube were included. Patients were selected for a modified replacement when the tube length of the primary placed RIG tube was insufficient to allow like-for-like replacement. Replacement was performed under local anesthetic and fluoroscopic guidance according to a preset technique, with modification of an endoscopic mushroom cage gastrostomy tube to allow percutaneous placement. Assessment of the success, safety, and durability of the modified technique was undertaken. Over a 60-month period, 104 primary placement mushroom cage tubes in ALS were performed. A total of 20 (19.2%) of 104 patients had a replacement tube positioned, 10 (9.6%) of 104 with the modified technique (male n = 4, female n = 6, mean age 65.5 years, range 48-85 years). All tubes were successfully replaced using this modified technique, with two minor complications (superficial wound infection and minor hemorrhage). The mean length of time of tube durability was 158.5 days (range 6-471 days), with all but one patient dying with a functional tube in place. We have devised a modification to allow percutaneous replacement of mushroom cage gastrostomy feeding tubes with minimal compromise to ALS patients. This technique allows tube replacement under local anesthetic, without the need for sedation, an important consideration in ALS.

Ammar, Thoraya [King's College Hospital, Department of Radiology (United Kingdom); Rio, Alan [King's College Hospital, Department of Dietetics (United Kingdom); Ampong, Mary Ann [King's College Hospital, Department of Neurosciences (United Kingdom); Sidhu, Paul S., E-mail: paulsidhu@nhs.ne [King's College Hospital, Department of Radiology (United Kingdom)

2010-06-15T23:59:59.000Z

179

Polymeric materials replacement issues for the LANL stockpile.  

SciTech Connect (OSTI)

A number of materials in the LANL stockpile are no longer available due to lack of availability or environment, safety and health issues. Silastic S-5370 a polysiloxane foam used to manufacture multiple components in LANL systems has been discontinued by Dow Corning. Kerimid 601 is a polyimide resin used as the binder for the syntactic foam used as a support material in the W76. It contains MDA, which has been identified by OSHA as a carcinogen and is no longer used in the nuclear weapons complex. In addition, the Thornel carbon mat used in the syntactic foam formulation is no longer available. These issues have created major challenges in the effort to reestablish aft support production capability for the W76 LEP. Urethane Encapsulant 7200, an adhesive used to bond explosive booster pellets and detonator components, was originally manufactured by Hexcel Corporation and is no longer available. The details of the projects currently underway to provide replacements for these materials will be discussed.

Sandoval, C. W. (Cynthia W.); Gladysz, G. M. (Gary M.); Stephens, T. S. (Thomas S.); Gleiman, S. S. (Seth S.); Mendoza, D. (Daniel); Baker, G. K. (G. Keith); Schoonover, J. R. (Jon R.); Schneider, Jim; Perry, B. (Brian); Lula, J. W.

2002-01-01T23:59:59.000Z

180

E-Print Network 3.0 - ankle replacement star Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

star Search Powered by Explorit Topic List Advanced Search Sample search results for: ankle replacement star Page: << < 1 2 3 4 5 > >> 1 BOSTON UNIVERSITY COLLEGE OF ENGINEERING...

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

E-Print Network 3.0 - arthroplasty replacement knee Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The BioMotion Foundation P... - eration in osteoarthritic knees and damage of polyethylene knee prostheses after total knee replacement... , before and after total knee ......

182

Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)  

SciTech Connect (OSTI)

This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

McBride, K.C.; Russell, V.K.

1994-10-04T23:59:59.000Z

183

Microsoft Word - CX-PascoDistrictPoleReplacement_FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access...

184

Microsoft Word - CX-FY11PascoDistrictWoodPoleReplacement_WEB...  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Toby Cossairt Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor...

185

Microsoft Word - CX-Redmond-PilotButte-Lapine_RelayCommunicationReplac...  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Jim Riehl Electrical Engineer - TECC-CSB-2 Proposed Action: Replace a relaytransfer trip rack at...

186

Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12...  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement...

187

Microsoft Word - CX-WenatcheeDistrictPoleReplacementFY13_WEB...  

Broader source: Energy.gov (indexed) [DOE]

2, 2013 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Joseph Lauer Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

188

Microsoft Word - CX-FY11WenatcheeDistrictWoodPoleReplacement...  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

189

E-Print Network 3.0 - australian replacement research Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

consumption be replaced by a zero... and Timetables of the Proposed Australian Emissions Trading Scheme Roger A. Pielke, Jr. Center for Science... and Technology Policy...

190

E-Print Network 3.0 - australian replacement research reactor...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

consumption be replaced by a zero... and Timetables of the Proposed Australian Emissions Trading Scheme Roger A. Pielke, Jr. Center for Science... and Technology Policy...

191

Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR webcast.

192

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network [OSTI]

). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

193

Acceptance test procedure for SY Tank Farm replacement exhauster unit  

SciTech Connect (OSTI)

The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

Becken, G.W.

1994-12-16T23:59:59.000Z

194

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc Complete Policy Title: Duplicate and Replacement Parchments, Diplomas and Certificates Procedures Policy Number (if applicable): Approved by: Senate Date of Most Recent Approval: March 14, 2007

Haykin, Simon

195

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for all replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new

196

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new semester

197

A Polynomial-Time Nuclear Vector Replacement Algorithm for Automated NMR Resonance Assignments  

E-Print Network [OSTI]

A Polynomial-Time Nuclear Vector Replacement Algorithm for Automated NMR Resonance Assignments and refinement. A new algorithm, called Nuclear Vector Replacement (NVR) is introduced to compute assignments be acquired in a fraction of the time needed to record the traditional suite of ex- periments used to perform

Lilien, Ryan

198

Energy Policy 29 (2001) 11331143 Ethanol as a lead replacement: phasing out leaded gasoline in Africa  

E-Print Network [OSTI]

Energy Policy 29 (2001) 1133­1143 Ethanol as a lead replacement: phasing out leaded gasoline cost of lead additives and of gasoline, and the falling cost of ethanol and sugarcane, have created sugarcane is produced in Africa to replace all the lead used in African gasoline; this would require Africa

Thomas, Valerie

199

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4  

E-Print Network [OSTI]

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES Person ID: 3. Business Mailing Address: [ ] Permanent or [ ] Temporary 4. Date of Birth or Date

200

Mercury Thermometer Replacement Alternatives Thermometer Description Non-Mercury Non-Mercury Non-Mercury  

E-Print Network [OSTI]

Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non-Mercury Non-Mercury Range / Division VWR-Enviro-Safe® Fisherbrand® Brooklyn Thermometer Company Inc. Total/A #12;Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana  

E-Print Network [OSTI]

INNOVATIVE APPROACH TO CHILLER REPLACEMENT AT LAFAYETl'E GENERAL MEDICAL CENTER LOCATED IN LAFAYElTE, LOUISIANA James M. Pocbe*, P.E Mechanical EngineerIPresident Poche* Associates, Ltd. ABSTRACI' The rafavette General Medical Center is a 332... chillers. The Hospital had been monitoring the CFC issue for the past several years, and felt it was time to begin replacing its 30 year old machines. The Hospital's original plan at the time of budgeting was a one-forane replacement of chillers...

Poche', J. M.; Broussard, J. P.

1998-01-01T23:59:59.000Z

202

Agents for replacement of NAD+/NADH system in enzymatic reactions  

DOE Patents [OSTI]

Novel agents acting as co-factors for replacement of NAD(P).sup.+ /NAD(P)H co-enzyme systems in enzymatic oxido-reductive reactions. Agents mimicking the action of NAD(P).sup.+ /NAD(P)H system in enzymatic oxidation/reduction of substrates into reduced or oxidized products. A method for selection and preparation of the mimicking agents for replacement of NAD(P).sup.+ /NAD(P)H system and a device comprising co-factors for replacement of NAD(P).sup.+ /NAD(P)H system.

Fish, Richard H.; Kerr, John B.; Lo, Christine H.

2004-04-06T23:59:59.000Z

203

Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it!  

E-Print Network [OSTI]

Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it! Item Description Price DNA Optical discount on these items.** #12;Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact

Evans, Paul G.

204

Transparent and Conductive Carbon Nanotube Multilayer Thin Films Suitable as an Indium Tin Oxide Replacement  

E-Print Network [OSTI]

Transparent electrodes made from metal oxides suffer from poor flexibility and durability. Highly transparent and electrically conductive thin films based on carbon nanotubes (CNTs) were assembled as a potential indium tin oxide (ITO) replacement...

Park, Yong Tae

2012-07-16T23:59:59.000Z

205

Drafty Windows: Is it Better to Insulate or Replace Them? | Department...  

Broader source: Energy.gov (indexed) [DOE]

expensive method is a simple window insulation kit, which includes a large sheet of plastic and double-sided tape; the most expensive (and most efficient) method is to replace...

206

Case Study Walnut Hill United Methodist Church - Dallas, Texas, Chiller Replacement Analysis  

E-Print Network [OSTI]

In March of 1992 Walnut Hill United Methodist Church in Dallas, Tx. decided that their existing thermal storage and electric reciprocating chiller system were both in need of replacement. After analyzing several options, they chose to install 150...

Phillips, J.

1998-01-01T23:59:59.000Z

207

Variation in joint fluid composition and its effect on the tribology of replacement joint articulation  

E-Print Network [OSTI]

Polyethylene wear is a significant clinical problem limiting the long-term survival of joint replacement prostheses, particularly in total hip arthroplasty (THA) and total knee arthroplasty (TKA). Although the tribology ...

Mazzucco, Daniel Clarke, 1976-

2003-01-01T23:59:59.000Z

208

Guideline for the seismic technical evaluation of replacement items for nuclear power plants  

SciTech Connect (OSTI)

Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included.

Harris, S.P.; Cushing, R.W. (EQE International, San Francisco, CA (United States)); Johnson, H.W. (Programmatic Solutions, Smithtown, NY (United States)); Abeles, J.M. (System 1, Inc., Potomac, MD (United States))

1993-02-01T23:59:59.000Z

209

Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB...  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the...

210

Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)  

SciTech Connect (OSTI)

Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

Not Available

2014-09-01T23:59:59.000Z

211

An Eye for an Eye: A Single Camera Gaze-Replacement Method The Blavatnik School of Computer Science  

E-Print Network [OSTI]

An Eye for an Eye: A Single Camera Gaze-Replacement Method Lior Wolf The Blavatnik School an effective so- lution to this problem that is based on replacing the eyes of the user. This replacement, when is asked to look straight at the camera. We store these frames,then track the eyes accurately in the video

Wolf, Lior

212

Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma  

E-Print Network [OSTI]

Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

Dupont, Pierre

213

Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming Ouhyoung ( )  

E-Print Network [OSTI]

Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming In this paper, we present a practical and complete system for plausible face replacement of videos. In our system, we take two videos as inputs, and aim to replace the target human subject's face with an- other

Ouhyoung, Ming

214

CAGE TRIALS USING AN ENDOGENOUS MEIOTIC DRIVE GENE IN THE MOSQUITO AEDES AEGYPTI TO PROMOTE POPULATION REPLACEMENT  

E-Print Network [OSTI]

POPULATION REPLACEMENT SUNG-JAE CHA, AKIO MORI, DAVE D. CHADEE, AND DAVID W. SEVERSON* Center for Tropical, West Indies Abstract. Control of arthropod-borne diseases based on population replacement into natural populations. Endogenous meiotic drive systems have strong and stable population replacement

Severson, David

215

IEEE/ACM TRANSACTIONS ON NETWORKING, VOL. 10, NO. 4, AUGUST 2002 441 Efficient Randomized Web-Cache Replacement  

E-Print Network [OSTI]

-Cache Replacement Schemes Using Samples From Past Eviction Times Konstantinos Psounis, Student Member, IEEE, and Balaji Prabhakar, Member, IEEE Abstract--The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least

216

0-7803-7016-3/01/$10.00 2001 IEEE A Randomized Web-Cache Replacement Scheme  

E-Print Network [OSTI]

0-7803-7016-3/01/$10.00 ©2001 IEEE A Randomized Web-Cache Replacement Scheme Konstantinos Psounis@isl.stanford.edu Abstract-- The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least recently used document" performs poorly

Prabhakar, Balaji

217

Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring  

E-Print Network [OSTI]

1 Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring Index terms--Optimal replacement, proportional hazards model, semi-Markov process, threshold replacement policy, sensitivity analysis SUMMARY This paper deals with the optimal

Ryan, Sarah M.

218

Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P. Kharoufeh2 Lisa M. Maillart3  

E-Print Network [OSTI]

Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P a stochastically degrading system using preventive and reactive replacements. The system's rate of degradation expected discounted cost of preventively and reactively replacing such a system over an infinite planning

Kharoufeh, Jeffrey P.

219

Improving Replacement Decisions in SetAssociative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg  

E-Print Network [OSTI]

Improving Replacement Decisions in Set­Associative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg Computer Science Department, University of Massachusetts, Amherst ABSTRACT Cache replacement policies play a key role in determining hit rates in set­associative caches. Cache replacement algorithms

Massachusetts at Amherst, University of

220

UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond)  

E-Print Network [OSTI]

UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond) STUDENT'S NAME STUDENT'S COLLEGE STUDENT'S UIN Under the Grade Replacement Policy for a repeated course, I request permission to replace the grade in the course listed below. I

Frank, Thomas D.

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events  

E-Print Network [OSTI]

A periodic inspection and replacement policy for systems subject to competing failure modes due-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time- based block replacement policy. Numerical results show that it is indeed useful to follow closely

Paris-Sud XI, Université de

222

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement  

SciTech Connect (OSTI)

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnels capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NEs long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

Noel Duckwitz

2011-05-01T23:59:59.000Z

223

BC-MM-792%20NEPA,%20Replace%20BC%2016%20inch%20B-Spec%20Crude...  

Broader source: Energy.gov (indexed) [DOE]

792 Title: Replace BC 16" B-Spec Crude Oil Header Piping Description: Subcontractor shall furnish all labor, tools, materials, equipment, and supervision required to replace the...

224

Exploring Aggregate Effect with Weighted Transcoding Graphs for Efficient Cache Replacement in Transcoding Proxies  

E-Print Network [OSTI]

Exploring Aggregate Effect with Weighted Transcoding Graphs for Efficient Cache Replacement University Taipei, Taiwan, ROC E-mail: {cychang@arbor.ee.ntu.edu.tw; mschen@cc.ee.ntu.edu.tw} Abstract This paper explores the aggregate effect when caching multiple versions of the same Web object

Chen, Ming-Syan

225

The Replacement Operation for CCP Programs Marco Bertolino 1 , Sandro Etalle 2 , and Catuscia Palamidessi 3  

E-Print Network [OSTI]

University catuscia@cse.psu.edu Abstract. The replacement is a very powerful transformation opera­ tion which common transformation operations such as unfold, fold, switching, distribution. Because of optimization techniques. To this end, while there exists a history and a wide literature on transformations

Palamidessi, Catuscia

226

Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings  

SciTech Connect (OSTI)

The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

Hunt, A.; Easley, S.

2012-05-01T23:59:59.000Z

227

Toroidal field coil replacement study for the International Thermonuclear Experimental Reactor (ITER)  

SciTech Connect (OSTI)

The objective of this study is to develop an estimate of the time required to replace a failed toroidal field (TF) coil in the International Thermonuclear Experimental Reactor (ITER). This estimate is based on the current ITER design which resulted from the Conceptual Design Activities began in spring of 1988 and ending in December 1990. Although the TF Coils in ITER are designated permanent components and expected to last the life of the plant, the history of failures of large coils in fusion devices has prompted an assessment of the down time that might be required for replacement of a failed TF coil in ITER. The difficulty of replacement of a TF Coil in ITER is compounded by the large physical size of ITER, and the radiation fields which necessitate the use of remote handling equipment for most maintenance activities. Since 10 out of 16 TF coils are adjacent to either a Neutral Beam Injector (NBI) port or a remote handling (RH) port, it is probable that a failed TF Coil will be in one of these inconvenient locations. For this study, TF coil number 3 is assumed to fail and its replacement will be evaluated as a typical case. TF coil number 3 is located between a remote handling port ({number sign}3) and a port allocated to the lower hybrid ({number sign}4).

Not Available

1991-08-01T23:59:59.000Z

228

Toroidal field coil replacement study for the International Thermonuclear Experimental Reactor (ITER)  

SciTech Connect (OSTI)

The objective of this study is to develop an estimate of the time required to replace a failed toroidal field (TF) coil in the International Thermonuclear Experimental Reactor (ITER). This estimate is based on the current ITER design which resulted from the Conceptual Design Activities began in spring of 1988 and ending in December 1990. Although the TF Coils in ITER are designated permanent components and expected to last the life of the plant, the history of failures of large coils in fusion devices has prompted an assessment of the down time that might be required for replacement of a failed TF coil in ITER. The difficulty of replacement of a TF Coil in ITER is compounded by the large physical size of ITER, and the radiation fields which necessitate the use of remote handling equipment for most maintenance activities. Since 10 out of 16 TF coils are adjacent to either a Neutral Beam Injector (NBI) port or a remote handling (RH) port, it is probable that a failed TF Coil will be in one of these inconvenient locations. For this study, TF coil number 3 is assumed to fail and its replacement will be evaluated as a typical case. TF coil number 3 is located between a remote handling port ({number_sign}3) and a port allocated to the lower hybrid ({number_sign}4).

Not Available

1991-08-01T23:59:59.000Z

229

Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without Underfill  

E-Print Network [OSTI]

Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without of Technology, GA 30332-0560 Abstract This paper reports the reliability of fine pitch interconnections using lower stresses in the interconnections and enhance reliability though they add electrical parasitics

Swaminathan, Madhavan

230

Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet data  

E-Print Network [OSTI]

1 Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet and a hybrid bus. Employing real-world bus fleet data from King County Metro (Washington State, USA) multiple multiple fleets of buses with different types of buses serving different routes. For example, King County

Bertini, Robert L.

231

Can electricity from the human body replace batteries? by Anne-Marie Bullock for BBC News  

E-Print Network [OSTI]

Harnessing energy from the human body may only generate small amounts of electricity but scientists believeCan electricity from the human body replace batteries? by Anne-Marie Bullock for BBC News it has a wide range of potentially life-changing applications. Imagine clothes made with materials

South Bohemia, University of

232

Towards Reliable Scheduling Schemes for Long-lived Replaceable Sensor Networks  

E-Print Network [OSTI]

, including energy conservation [1], ambient energy harvesting [2]­[6], incremental deployment, and node reclamation and replacement [7], [8]. Energy conservation schemes can slow down energy con- sumption and thus. For example, the amount of energy that a solar cell can harvest is proportional to its surface area

Wang, Guiling

233

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPAs proposed action was to fund the project

234

Analysis of the Repair vs. Replace Decision for Small AC Motors  

E-Print Network [OSTI]

This morning in the course of my discussion, I would like to cover how we at Westvaco were handling our motor replacement decisions, how we are handling them now and how we determined the costs and benefits of such a change. As you have already...

Chamberlain, P. F.

1984-01-01T23:59:59.000Z

235

Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage  

E-Print Network [OSTI]

1 Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage--Hybrid electrical energy storage systems (HEES) are comprised of multiple banks of inhomogeneous EES elements storage device, i.e., high energy capacity, high output power level, low self-discharge, low cost

Pedram, Massoud

236

Managing Inventory of Items with Replacement Wei Huang Vidhyadhar Kulkarni 1  

E-Print Network [OSTI]

Managing Inventory of Items with Replacement Warranty Wei Huang Vidhyadhar Kulkarni 1 Jayashankar items under warranty. We model this setting as a multi-period single product inventory problem where that neglects warranty repairs. Keyword: Warranty, Inventory, Stochastic Demand, Information. 1 This work

Kulkarni, Vidyadhar G.

237

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect (OSTI)

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

238

[Minor revisionposted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish a standard procedure for controlled access, securityOP 61.07 [Minor revisionposted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure employees required to perform operational #12;December 6, 2012 Page 2 OP 61.07 checks and maintenance

Rock, Chris

239

[Minor revisionposted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish standards for traffic and parking control devices to ensureOP 61.18 [Minor revisionposted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure of Grounds Maintenance by August 1 of every year." b. The assistant vice president for operations

Rock, Chris

240

[Minor revisionposted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish standards and guidelines for the use and selectionOP 61.14 [Minor revisionposted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure and issuance of keys, development of keying systems, standardization of hardware, and maintenance programs

Rock, Chris

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

[Minor revisionposted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish a standard procedure for locating exterior signsOP 61.22 [Minor revisionposted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure approval, a Project Request (Attachment B, OP 61.28) will be forwarded to Operations Division Maintenance

Rock, Chris

242

Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene  

SciTech Connect (OSTI)

To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce (GSKNC)

2014-08-13T23:59:59.000Z

243

GREEN LIVING Replace incandencent and halogen light bulbs with LED and CLFs  

E-Print Network [OSTI]

GREEN LIVING GUIDE ENERGY TRAVEL FOOD sustain yosef WATER Replace incandencent and halogen light for your laundry RESIST THAT SWITCH! Use natural light during the day, and no lights when you are gone USE MORE THAN YOU CAN EAT, reduce your waste stream DRINK FAIR TRADE COFFEE - Check out Conrad

Thaxton, Christopher S.

244

Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule  

E-Print Network [OSTI]

Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule and balance depend upon hair cells, the sensory receptors of the inner ear. Millions of people suffer from hearing and balance deficits caused by damage to hair cells as a result of exposure to noise

245

Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after  

E-Print Network [OSTI]

Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after Targeted Ablation of Hair Cells with Diphtheria Toxin Justin S. Golub,1 Ling Tong,1 Tot B. Ngyuen,1 Cliff R. Hume,1 Richard developed a transgenic mouse to permit conditional and selective ablation of hair cells in the adult mouse

Rubel, Edwin

246

Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received.  

E-Print Network [OSTI]

Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received. Note: The replacement diploma is produced with a replacement note on the reverse side. There is a fee of $50 for a replacement parchment. DELIVERY INSTRUCTIONS

Saskatchewan, University of

247

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement  

SciTech Connect (OSTI)

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NEs long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. Provide backup power to the critical ATR loads in the event of a loss of commercial power. Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

Noel Duckwtiz

2011-05-01T23:59:59.000Z

248

COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer  

E-Print Network [OSTI]

COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer replacement up to $1,300. The funding will be approved only if the faculty member has not purchased a computer with start-up, research, FRAP or other funds (including Computer

Qian, Ning

249

Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment  

SciTech Connect (OSTI)

The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

Not Available

1992-09-01T23:59:59.000Z

250

Development of Replacements for Phoscoating Used in Forging, Extrusion and Metal Forming Processes  

SciTech Connect (OSTI)

Many forging, extrusion, heading and other metal forming processes use graphite-based lubricants, phosphate coatings, and other potentially hazardous or harmful substances to improve the tribology of the metal forming process. The application of phosphate-based coatings has long been studied to determine if other synthetic ''clean'' lubricants could provide the same degree of protection afforded by phoscoatings and its formulations. So far, none meets the cost and performance objectives provided by phoscoatings as a general aid to the metal forming industry. In as much as phoscoatings and graphite have replaced lead-based lubricants, the metal forming industry has had previous experience with a legislated requirement to change processes. However, without a proactive approach to phoscoating replacement, many metal forming processes could find themselves without a cost effective tribology material necessary for the metal forming process

Kerry Barnett

2003-03-01T23:59:59.000Z

251

Evaluation of replacement thread lubricants for red lead and graphite in mineral oil  

SciTech Connect (OSTI)

Eight commercially available thread lubricants were evaluated to determine the best replacement for Red Lead and Graphite in Mineral Oil (RLGMO). The evaluation included coefficient of friction testing, high temperature anti-seizing testing, room temperature anti-galling testing, chemical analysis for detrimental impurities, corrosion testing, off-gas testing, and a review of health and environmental factors. The coefficient of friction testing covered a wide variety of factors including stud, nut, and washer materials, sizes, manufacturing methods, surface coatings, surface finishes, applied loads, run-in cycles, and relubrication. Only one lubricant, Dow Corning Molykote P37, met all the criteria established for a replacement lubricant. It has a coefficient of friction range similar to RLGMO. Therefore, it can be substituted directly for RLGMO without changing the currently specified fastener torque values for the sizes, materials and conditions evaluated. Other lubricants did not perform as well as Molykote P37 in one or more test or evaluation categories.

Jungling, T.L.; Rauth, D.R.; Goldberg, D.

1998-04-30T23:59:59.000Z

252

Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement

253

Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil | Department of  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement

254

Why Insertion Turbine Meters are Replacing Orifice Plates for Steam Flow Measurement  

E-Print Network [OSTI]

WHY INSERTION TURBINE MBTBRS A E REPLACING ORIFICE PLATES FOR STEAM FLOW MEASURE ENT J. J. Rusnak Engineering Measurements Company Longmont, Colorado ABSTRACT Flow measurement is a complex and application related discipline. It borders... to be instrumented quickly, economically and without dis rupting production; and further, these meters had to be accurate in order to be useful in making energy saving decisions. Thus, the entry of the insertion turbine meter for steam in 1975. Since then it has...

Rusnak, J. J.

1983-01-01T23:59:59.000Z

255

A PROTOTYPE FOUR INCH SHORT HYDRIDE (FISH) BED AS A REPLACEMENT TRITIUM STORAGE BED  

SciTech Connect (OSTI)

The Savannah River Site (SRS) tritium facilities have used 1st generation (Gen1) metal hydride storage bed assemblies with process vessels (PVs) fabricated from 3 inch nominal pipe size (NPS) pipe to hold up to 12.6 kg of LaNi{sub 4.25}Al{sub 0.75} metal hydride for tritium gas absorption, storage, and desorption for over 15 years. The 2nd generation (Gen2) of the bed design used the same NPS for the PV, but the added internal components produced a bed nominally 1.2 m long, and presented a significant challenge for heater cartridge replacement in a footprint limited glove-box. A prototype 3rd generation (Gen3) metal hydride storage bed has been designed and fabricated as a replacement candidate for the Gen2 storage bed. The prototype Gen3 bed uses a PV pipe diameter of 4 inch NPS so the bed length can be reduced below 0.7 m to facilitate heater cartridge replacement. For the Gen3 prototype bed, modeling results show increased absorption rates when using hydrides with lower absorption pressures. To improve absorption performance compared to the Gen2 beds, a LaNi{sub 4.15}Al{sub 0.85} material was procured and processed to obtain the desired pressure-composition-temperature (PCT) properties. Other bed design improvements are also presented.

Klein, J.; Estochen, E.; Shanahan, K.; Heung, L.

2011-02-23T23:59:59.000Z

256

Creating markets for new products to replace incandescent lamps: The international experience  

SciTech Connect (OSTI)

Since the summer of 1995, several organizations have been in pursuit of what many consider the Holy Grail of lighting technology--a low-cost, drop-in, energy-efficient replacement for the incandescent lamp. This paper summarizes the international experience in attempting to catalyze the commercialization of a mass-market, replacement product that could have major impact on residential lighting energy consumption in US and EU homes. The technology procurement effort was originally spearheaded by US Federal Government through a loose collaboration between the Department of Defense (DoD), the Environmental Protection Agency (EPA) and the Department of Energy (DOE). The DoD agreed to serve as the anchor buyer for a low-cost, drop-in replacement product for standard-sized light bulbs that provide at least 30 percent energy savings compared to traditional incandescent lamps. In parallel to the US effort, the International Energy Agency launched a co-operative technology procurement effort by assembling large buyers' groups in Finland, the Netherlands, Sweden, and the United Kingdom to pull a similar efficient lighting product into the European market. The lukewarm response from lamp manufacturers to these two technology procurement efforts illustrates the challenges of transforming residential lighting from incandescent to efficient lighting.

Rubinstein, F.; Borg, N.; Horowitz, N.; Narel, T.; Morehouse, E.T. Jr.

1998-07-01T23:59:59.000Z

257

phenix.mr_rosetta: a new tool for difficult molecular replacement problems  

SciTech Connect (OSTI)

The PHENIX development team is working with the Baker laboratory at the University of Washington to combine the power of Rosetta structure modeling with PHENIX automated molecular replacement (MR), model-building, density modification, and refinement. The basic idea is to find MR solutions with phenix. automr, rebuild them with Rosetta, including electron density map information, then rebuild those models with phenix. autobuild. The combination of Rosetta rebuilding and phenix rebuilding is the key part of this method. MR solutions are found with phenix. automr (Phaser), scored with LLG (optionally following Rosetta relaxation), the best solutions are picked and rebuilt with Rosetta including map information, the resulting models are scored with Rosetta, and then rescored with LLG, and the top models are rebuilt with phenix. autobuild. It can be very useful for cases where the search model used in molecular replacement is slightly too distant to rebuild successfully with phenix. autobuild. It can also be useful in cases where the model is too distant to even find a molecular replacement solution, and prerefinement with Rosetta can yield an improved search model.

Terwilliger, Thomas C [Los Alamos National Laboratory; Read, Randy [UNIV OF CAMBRIDGE; De Maio, Frank [UNIV OF WASHINGTON; Baker, David [UNIV OF WASHINGTON

2011-01-12T23:59:59.000Z

258

Percutaneous Valve Replacement: Significance of Different Delivery Systems In Vitro and In Vivo  

SciTech Connect (OSTI)

Background and purpose. Percutaneous heart valve replacement is an exciting growing field in cardiovascular medicine yet still with some major problems. Only sophisticated improvement of the instruments could make it a real alternative to conventional surgery. Therefore, the aim of this study was to evaluate different delivery devices for percutaneous heart valve replacement in vitro and in vivo. Methods. A catheter prototype designed by our group, and two commercially available devices for the delivery of esophageal stents and aortic endoprostheses, were tested. After in vitro experiments, an ovine animal model of transfemoral pulmonary valve implantation was established using biological valved self-expanding stents. Only the delivery device for aortic endografts (Medtronic, Talent, Santa Rosa, CA, USA) allowed fast in vitro procedures without material fatigue. This device was chosen for the in vivo tests. Results. Technical success was achieved in 9 of 10 animals (90%). One animal died after perforation of the ventricular wall. Orthotopic pulmonary placement was performed in 6 animals and intentional supravalvular valved stent placement in 3 animals. Conclusions. An adequate in vitro model for this evolving field of interventional heart valve replacement is presented. Furthermore, the present study pinpoints the key characteristics that are mandatory for a delivery system in percutaneous pulmonary valve implantation. With regard to the delivery device's ductility observed during this 'venous' study, an approach to transfemoral aortic valve implantation seems feasible.

Attmann, Tim; Lutter, Georg, E-mail: lutter@kielheart.uni-kiel.de; Quaden, Rene [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Jahnke, Thomas [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany); Rumberg, Kristin; Cremer, Jochen [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Muller-Hulsbeck, Stefan [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany)

2006-06-15T23:59:59.000Z

259

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors  

SciTech Connect (OSTI)

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnels capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NEs long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD pump catcher technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

Noel Duckwitz

2011-05-01T23:59:59.000Z

260

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement  

SciTech Connect (OSTI)

The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

David E. Korns

2012-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry  

SciTech Connect (OSTI)

This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

2012-09-01T23:59:59.000Z

262

Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement of50.2

263

Replaces EIA-459C All Other Editions Are Obsolete OMB Control No.  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement 4600.4

264

A decision-making framework to determine the value of on-orbit servicing compared to replacement of space telescopes  

E-Print Network [OSTI]

The Hubble Space Telescope has demonstrated that on-orbit servicing can provide significant benefits for scientific space programs. Specifically, servicing missions can replace failed components to keep spacecraft operational, ...

Baldesarra, Mark

2007-01-01T23:59:59.000Z

265

Potential commercial application of a bi-layer bone-ligament regeneration scaffold to anterior cruciate ligament replacement  

E-Print Network [OSTI]

A business model was created in order to explore the commercial application of a bi-layer bone-ligament scaffold to the treatment of torn anterior cruciate ligaments (ACL) requiring replacement. The two main keys in producing ...

Li, Jessica C. (Jessica Ching-Yi)

2006-01-01T23:59:59.000Z

266

Replace Pressure-Reducing Valves with Backpressure Turbogenerators (International Fact Sheet), Energy Tips-Steam, Steam Tip Sheet #20c  

SciTech Connect (OSTI)

This English/Chinese ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2010-10-01T23:59:59.000Z

267

ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

Widener, Kevin; Bharadwaj, Nitin; Johnson, Karen

268

Journal of the National Cancer Institute, Vol. 98, No. 18, September 20, 2006 ARTICLES 1311 Background: Unopposed estrogen replacement therapy is  

E-Print Network [OSTI]

Background: Unopposed estrogen replacement therapy is associated with increased risk of endometrial cancer replacement therapy use and SULT1A1*2 genotype: the SULT1A1*2 allele and long-term use of estrogen replacement OR = 3.85, 95% CI = 1.48 to 10.00) than that of the SULT1A1*2 allele and no estrogen replacement therapy

Pennsylvania, University of

269

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District 72" and 48" Pipeline Replacing Main Canal Final  

E-Print Network [OSTI]

TR-246 October 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District 72" and 48" Pipeline Replacing Main Canal Final M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson... estimates of water-savings (i.e., seepage and evaporation) and the initial construction cost. Also, an engineering design change resulted in the east and west forks of the Main Canal being replaced with 48" instead of 54" pipeline. This Final document...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

270

Revised: 11/2012 Replacement diplomas may be obtained from the Office of the University Registrar and must be requested by  

E-Print Network [OSTI]

Revised: 11/2012 Replacement diplomas may be obtained from the Office of the University Registrar and must be requested by the student. To request a replacement diploma, please complete this form and send, VA 23187-8795 (757) 221-2800 Fax: (757) 221-2151 registrar@wm.edu REPLACEMENT DIPLOMA REQUEST FORM

Swaddle, John

271

3D-Model-based Face Replacement in Video Virginia Tzeng*, Yi-Ting Cheng*, Yu Liang*, Chuan-Chang Wang  

E-Print Network [OSTI]

3D-Model-based Face Replacement in Video Virginia Tzeng*, Yi-Ting Cheng*, Yu Liang*, Chuan and important topic. In this paper, we present a system for face replacement in video. Most digital processing software can perform face replacement only when the poses for the source and target faces are similar

Ouhyoung, Ming

272

Review Article Replacing fossil oil with fresh oil with what and for what?  

E-Print Network [OSTI]

Industrial chemicals and materials are currently derived mainly from fossil-based raw materials, which are declining in availability, increasing in price and are a major source of undesirable greenhouse gas emissions. Plant oils have the potential to provide functionally equivalent, renewable and environmentally friendly replacements for these finite fossil-based raw materials, provided that their composition can be matched to end-use requirements, and that they can be produced on sufficient scale to meet current and growing industrial demands. Replacement of 40 % of the fossil oil used in the chemical industry with renewable plant oils, whilst ensuring that growing demand for food oils is also met, will require a trebling of global plant oil production from current levels of around 139 MT to over 400 MT annually. Realisation of this potential will rely on application of plant biotechnology to (i) tailor plant oils to have high purity (preferably>90%) of single desirable fatty acids, (ii) introduce unusual fatty acids that have specialty end-use functionalities and (iii) increase plant oil production capacity by increased oil content in current oil crops, and conversion of other high biomass crops into oil accumulating crops. This review outlines recent progress and future challenges in each of these areas. Practical applications: The research reviewed in this paper aims to develop metabolic engineering technologies to radically increase the yield and alter the fatty acid composition of plant oils and enable the

Anders S. Carlsson; Jenny Lindberg Yilmaz; Allan G. Green; Sten Stymne; Per Hofv

273

Global warming and end-use efficiency implications of replacing CFCs  

SciTech Connect (OSTI)

The direct contribution of CFCs to calculated global warming has been recognized for some time. As a result of the international agreement to phase out CFCs due to stratospheric ozone and the ensuing search for suitable alternatives, there has recently been increased attention on the DIRECT global warming potential (GWP) of the fluorocarbon alternatives as greenhouse gases. However, to date there has been little focus on the INDIRECT global warming effect arising from end-use efficiency changes and associated CO{sub 2} emissions. A study being conducted at Oak Ridge National Laboratory (ORNL) addresses this combined or total global warming impact of viable options to replace CFCs in their major energy-related applications. This paper reviews selected results for air-conditioning, refrigeration, and heat pump applications. The analysis indicates that the CFC user industries have made substantial progress in approaching near-equal energy efficiency with the HCFC/HFC alternative refrigerants. The findings also bring into question the relative importance of the DIRECT (chemical-related) effect in many applications. Replacing CFCs is an important step in reducing the total global warming impact, and at present the HCFC and HFCS appear to offer the best efficiency and lowest total impact of options available in the relatively short time period required for the transition away from CFCs.

Fairchild, P.D.; Fischer, S.K.

1991-12-31T23:59:59.000Z

274

Replacing Resistance Heating with Mini-Split Heat Pumps, Sharon, Connecticut (Fact Sheet)  

SciTech Connect (OSTI)

Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

Not Available

2014-05-01T23:59:59.000Z

275

The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project  

SciTech Connect (OSTI)

The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref.

Presgrove, S.B. (Bechtel Savannah River, Inc., North Augusta, SC (United States))

1992-01-01T23:59:59.000Z

276

The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project  

SciTech Connect (OSTI)

The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref.

Presgrove, S.B. [Bechtel Savannah River, Inc., North Augusta, SC (United States)

1992-08-01T23:59:59.000Z

277

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects  

SciTech Connect (OSTI)

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

Richman, Eric E.

2009-11-04T23:59:59.000Z

278

Refined coconut oil as a source of dietary fat in a milk replacer for dairy calves  

E-Print Network [OSTI]

eesesae. ga gessac yesco che 4ieoeyery et escQdoasss, chs 41ssesssy sa4 sse ?4 ecohiliss4 viceala espplsssocb ~ Chs Leeseesso ess ot 4rls4 aLLb pss4sscs is oilb rsplassrr trsreoiee hae ssoccibscs4 cs chs ~Lep- osec ot Lapsoosa ss4 sttisissc er...LLh seplasee tssaslas (to) Chs sss4 terr lsc ss ~ elsCrsSMC lo ICLLb ssplssete tos osLToo ses cesecsiss4 as socle es cbs i4sa st teoaslociaw ~ spscbscia Fecfes Norr gssag saL~. os4-Liver eiL ~ Leraheblp cbs- ticac siL sss4 cs replace Che 4SC St Shale allb...

Barsales, Petronilo Bringuel

2012-06-07T23:59:59.000Z

279

Use of waste gypsum to replace natural gypsum as set retarders in portland cement  

SciTech Connect (OSTI)

The present study is focused on clarifying the influence of waste gypsum (WG) in replacing natural gypsum (NG) in the production of ordinary Portland cement (OPC). WG taken from slip casting moulds in a ceramic factory was formed from the hydration of plaster of paris. Clinker and 3-5 wt% of WG was ground in a laboratory ball mill to produce cement waste gypsum (CMWG). The same procedure was repeated with NG to substitute WG to prepare cement natural gypsum (CMNG). The properties of NG and WG were investigated via X-ray Diffraction (XRD), X-ray fluorescence (XRF) and differential scanning calorimetry (DSC)/thermogravimetric (TG) to evaluate the properties of CMNG and CMWG. The mechanical properties of cement were tested in terms of setting time, flexural and compressive strength. The XRD result of NG revealed the presence of dihydrate while WG contained dihydrate and hemihydrate. The content of dihydrate and hemihydrates were obtained via DSC/TG, and the results showed that WG and NG contained 12.45% and 1.61% of hemihydrate, respectively. Furthermore, CMWG was found to set faster than CMNG, an average of 15.29% and 13.67% faster for the initial and final setting times, respectively. This was due to the presence of hemihydrate in WG. However, the values obtained for flexural and compressive strength were relatively the same for CMNG and CMWG. Therefore, this result provides evidence that WG can be used as an alternative material to NG in the production of OPC.

Chandara, Chea; Azizli, Khairun Azizi Mohd [School of Materials and Mineral Resources Engineering, Universiti Sains Malaysia, 14300 Nibong Tebal, Penang (Malaysia); Ahmad, Zainal Arifin [School of Materials and Mineral Resources Engineering, Universiti Sains Malaysia, 14300 Nibong Tebal, Penang (Malaysia)], E-mail: zainal@eng.usm.my; Sakai, Etsuo [Tokyo Institute of Technology, Graduate School of Science and Engineering, Department of Metallurgy and Ceramic Science, 2-12-1 Meguro-ku, Ookayama, Meguro-ku, Tokyo 152-8552 (Japan)

2009-05-15T23:59:59.000Z

280

Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)  

SciTech Connect (OSTI)

The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

Not Available

2014-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

282

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

283

Synthesis and casting of a lithium-bismuth compound for an ion-replacement electrorefiner.  

SciTech Connect (OSTI)

The intermetallic compound Li{sub 3}Bi played an integral part in the demonstration of an ion replacement electrorefining method developed at Argonne National Laboratory. The Li{sub 3}Bi compound was generated in a tilt-pour casting furnace using high-purity lithium and bismuth metals as the initial charge. At first, small-scale ({approximately}20 g) experiments were conducted to determine the materials synthesis parameters. In the end, four larger-scale castings (500 g to 1250 g) were completed in a tantalum crucible. The metals were heated slowly to melt the charge, and the formation reaction proceeded vigorously above the melting point of bismuth ({approximately}270 C). For the large-scale melts, the furnace power was temporarily turned off at this point. After several minutes, the tantalum crucible stopped glowing, and the furnace power was turned on. The temperature was then increased to {approximately}1200 C to melt and homogenize the compound, and liquid Li{sub 3}Bi was cast into cold stainless steel molds. Approximately 3.7 kg of Li{sub 3}Bi was generated by this method.

McDeavitt, S. M.

1998-11-23T23:59:59.000Z

284

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

285

Methods for disassembling, replacing and assembling parts of a steam cooling system for a gas turbine  

DOE Patents [OSTI]

The steam cooling circuit for a gas turbine includes a bore tube assembly supplying steam to circumferentially spaced radial tubes coupled to supply elbows for transitioning the radial steam flow in an axial direction along steam supply tubes adjacent the rim of the rotor. The supply tubes supply steam to circumferentially spaced manifold segments located on the aft side of the 1-2 spacer for supplying steam to the buckets of the first and second stages. Spent return steam from these buckets flows to a plurality of circumferentially spaced return manifold segments disposed on the forward face of the 1-2 spacer. Crossover tubes couple the steam supply from the steam supply manifold segments through the 1-2 spacer to the buckets of the first stage. Crossover tubes through the 1-2 spacer also return steam from the buckets of the second stage to the return manifold segments. Axially extending return tubes convey spent cooling steam from the return manifold segments to radial tubes via return elbows. The bore tube assembly, radial tubes, elbows, manifold segments and crossover tubes are removable from the turbine rotor and replaceable.

Wilson, Ian D. (Mauldin, SC); Wesorick, Ronald R. (Albany, NY)

2002-01-01T23:59:59.000Z

286

Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin  

SciTech Connect (OSTI)

The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

David Brien

2012-06-21T23:59:59.000Z

287

Further Investigations of the Effect of Replacing Lithium by Sodium on Lithium Silicate Scintillating Glass Efficiency  

SciTech Connect (OSTI)

Ce3+ doped lithium (6Li) silicate glasses are thermal neutron detectors. Prior work showed that when sodium (Na) is substituted for Li the scintillation efficiency, under beta particle stimulation, increased and then decreased as the sodium (Na) content was increased [1]. When all the 6Li was replaced by Na no scintillation was observed. Raman spectra, acquired using a visible excitation source provided no evidence of anomalous behavior. SEM microscopy did show some phase separation, but there was no obvious correlation with the scintillation efficiency. We have reexamined these glass samples using deep UV Raman excitation which reduces fluorescence interference. The newly acquired spectra show evidence of phase separation in the glasses. Specifically we see a peak at 800 cm-1 Raman shift which can be assigned to a vitreous silica moiety that results from phase separation. There is a strong correlation between this peak's area, the scintillation efficiency, and the Na content. The observed trend suggests that phase separation enhances scintillation and addition of Na reduces the amount of phase separation. We also see evidence of at least two defect structures that can be tentatively assigned to a three-membered ring structure and an oxygen vacancy. The latter is fairly strongly correlated with enhanced scintillation efficiency.

Bliss, Mary; Aker, Pamela M.; Windisch, Charles F.

2012-02-15T23:59:59.000Z

288

Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring  

SciTech Connect (OSTI)

The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

Dentz, J.; Henderson, H.; Varshney, K.

2014-09-01T23:59:59.000Z

289

Hydrothermal alteration in the EPF replacement wells, Olkaria Geothermal field, Kenya  

SciTech Connect (OSTI)

Olkaria Geothermal area is located in the central sector of the Kenya, Rift Valley. A 45MW Geothermal power station has been operational at Olkaria since 1985 supplied by 22 of the 26 wells drilled in the Eastern production field (EPF). Between 1988 and 1993, eight more wells referred to as {open_quote}replacement wells{close_quote} were drilled in the same field to boost steam supply to the station. Petrographic analyses of the drill cuttings is usually done to determine detail stratigraphy of the field, extends of hydrothermal activity, subsurface structures and other parameters which may influence production potential of a well. Analyses of the drill cuttings from the EPF wells show that: Variations in the whole rock alteration intensities correlate with differences in rocktypes. Permeable horizons, especially the productive feeder zones are well marked by enhanced hydrothermal minerals depositions, mainly quartz, calcite, pyrite and epidote. Other aspects of state of reservoir like boiling are signified by presence of bladed calcite.

Mungania, J. [Kenya Power & Lighting Co. Ltd., Naivasha (Kenya)

1996-12-31T23:59:59.000Z

290

The Effects of Metaphylaxis and Milk Replacer Additives on Health and Growth of Neonatal Holstein Bull Calves  

E-Print Network [OSTI]

received a commercial milk replacer powder (22% Crude Protein / 20% Crude Fat) fed at 1.1% BW. Within metaphylaxis treatment, calves were randomly assigned to receive either: 1) 4 g/d for 7 d and then 2 g/d for 14 d of an egg-based probiotic (PR); 2) 2 g...

Dehaan, Katherine G.

2010-07-14T23:59:59.000Z

291

Simulation Analyses in Support of DOEs Fossil Fuel Rule for Single Component Equipment and Lighting Replacements  

SciTech Connect (OSTI)

At the request of DOEs Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building.

Halverson, Mark A.; Wang, Weimin

2013-10-16T23:59:59.000Z

292

Total replacement of soybean oil-meal in growing pig diets : Use of peas supplemented with tryptophan  

E-Print Network [OSTI]

Total replacement of soybean oil-meal in growing pig diets : Use of peas supplemented with tryptophan or combined with a lucerne protein concentrate J.M. PEREZ, D. BOURDON 1.!N.I?.A., Station de and more) in growing pig diets generally leads to a lower performance. Two successive experiments were made

Paris-Sud XI, Université de

293

On-Demand Node Reclamation and Replacement for Guaranteed Area Coverage in Long-lived Sensor Networks  

E-Print Network [OSTI]

is an important and challenging problem in sensor network design. Recently, Tong et al. have proposed a node replacement and reclamation (NRR) strategy, and designed an adaptive rendezvous-based two-tier scheduling of energy that a solar cell can harvest is proportional to its surface area, but it is infeasible to equip

Zhang, Wensheng

294

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District 72" and 54" Pipeline Replacing Main Canal Preliminary  

E-Print Network [OSTI]

) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the Main Canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

295

Most terrestrial vertebrates are able to replace water lost to the environment by drinking water. In amniotes, drinking is  

E-Print Network [OSTI]

Most terrestrial vertebrates are able to replace water lost to the environment by drinking water, not drinking, because water, unlike food, is physically uniform (at least between 1 and 99 °C). Modifications the frequent need to regain lost water, drinking is secondary to feeding. Furthermore, if drinking is achieved

Behe, Michael J.

296

Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya  

E-Print Network [OSTI]

Re-Placing Faith: Reconsidering the Secular-Religious Use Divide in the United States and Kenya in urban centers in the United States and Kenya. The contributions of this work for the CHI/CSCW community countries, including key "emerging markets" such as Brazil, Nigeria and Kenya, the recent growth

Aoki, Paul M.

297

Proposal for the award of a blanket purchase contract for the replacement and maintenance of lifts giving access to the LHC underground areas  

E-Print Network [OSTI]

Proposal for the award of a blanket purchase contract for the replacement and maintenance of lifts giving access to the LHC underground areas

2015-01-01T23:59:59.000Z

298

Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project  

SciTech Connect (OSTI)

Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (doseresponse) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

2013-06-25T23:59:59.000Z

299

Low Cost, Single Layer Replacement for the Back-Sheet and Encapsulant Layers  

SciTech Connect (OSTI)

Ethylene propylene diene monomer (EPDM) based polymers have been formulated for specific use in photovoltaic modules to produce better performance and longer term stability at a lower cost than standard materials. EPDM formulations are advantageous over ethylene vinyl-acetate (EVA) because they can use the same lamination/cure cycle as EVA, they do not need a second back-sheet protective material (e.g. PET/Tedlar), they have a lower glass transition temperature, no melting transition, more constant mechanical moduli as a function of temperature, they are less polar than EVA (provides better corrosion protection), and they have excellent damp heat (85 C/85% relative humidity) resistance against delamination. Module designs typically use EVA on the back side of cells despite the fact that transparency is not advantageous. We have developed a single encapsulant layer that will replace standard module back-sheet constructions consisting of EVA/PET/Tedlar. Because a single low-cost material layer is used, it will provide a significant materials cost savings of about $6 to $8/m{sup 2} as compared to traditional back-sheets. Electrical insulation tests were conducted using 0.85 mm thick stainless steel sheets as a model for a cell. It was found that a polymer layer thickness of about 0.33mm provided better high voltage electrical insulation than a combined film of Tedla (0.038 mm)/PET (0.051 mm)/EVA (0.55 mm). When formulated with a white pigment, reflectivity was comparable to Tedlar{trademark}. Upon accelerated exposure to light at 60C and 60% RH it was found that an EVA layer in front of these materials would decompose before significant yellowing and delamination of the back EPDM layer occurs.

Kempe, M. D.; Thapa, P.

2008-01-01T23:59:59.000Z

300

Stress Testing of the Philips 60W Replacement Lamp L Prize Entry  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory, operated by Battelle for the U.S. Department of Energy, worked with Intertek to develop a procedure for stress testing medium screw-base light sources. This procedure, composed of alternating stress cycles and performance evaluation, was used to qualitatively compare and contrast the durability and reliability of the Philips 60W replacement lamp L Prize entry with market-proven compact fluorescent lamps (CFLs) with comparable light output and functionality. The stress cycles applied simultaneous combinations of electrical, thermal, vibration, and humidity stresses of increasing magnitude. Performance evaluations measured relative illuminance, x chromaticity and y chromaticity shifts after each stress cycle. The Philips L Prize entry lamps appear to be appreciably more durable than the incumbent energy-efficient technology, as represented by the evaluated CFLs, and with respect to the applied stresses. Through the course of testing, all 15 CFL samples permanently ceased to function as a result of the applied stresses, while only 1 Philips L Prize entry lamp exhibited a failure, the nature of which was minor, non-destructive, and a consequence of a known (and resolved) subcontractor issue. Given that current CFL technology appears to be moderately mature and no Philips L Prize entry failures could be produced within the stress envelope causing 100 percent failure of the benchmark CFLs, it seems that, in this particular implementation, light-emitting diode (LED) technology would be much more durable in the field than current CFL technology. However, the Philips L Prize entry lamps used for testing were carefully designed and built for the competition, while the benchmark CFLs were mass produced for retail salea distinction that should be taken into consideration. Further reliability testing on final production samples would be necessary to judge the extent to which the results of this analysis apply to production versions of the Philips L Prize entry.

Poplawski, Michael E.; Ledbetter, Marc R.; Smith, Mark

2012-04-24T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Modular condenser replacement at ANO-1 solves operating problems and improves performance  

SciTech Connect (OSTI)

After 22 years of operation, the condenser tube bundles and waterboxes at Arkansas Nuclear One, Unit 1 (ANO-1) had deteriorated significantly, impairing operating performance, reducing condenser reliability and increasing maintenance cost. An extensive condition assessment performed in 1995 revealed a 34% wall loss on the original Admiralty tubing and an erosion rate of 1.7% annually. Additionally, Arkansas Nuclear One was considering an 8% power uprate, which would place additional duty on the main condenser. As a result, it was decided to completely reconstruct the four condenser tube bundles serving the two low-pressure turbines at Arkansas Nuclear One. An evaluation of the available condenser tube materials was performed to determine which material was best suited for service in the single pass, single pressure condenser at ANO-1. All copper based materials were excluded from consideration due to the detrimental effect copper has on secondary chemistry and more specifically steam generator integrity. Titanium and a variety of stainless steel materials were evaluated, and ultimately titanium was selected as the replacement condenser tube material for the rebuilt condenser tube bundles due primarily to its corrosion resistance and extensive operating experience in condenser service. An impressed current cathodic protection system and epoxy waterbox coating was also installed to prevent galvanic corrosion of the carbon steel waterboxes. The cathodic protection system included local alarm indication to alert plant operating staff of any system malfunction that could result in titanium hydrating. A comparison of the heat transfer characteristics of the existing condenser design with Admiralty tubes and a new tube bundle design with titanium tubes concluded that a new tube bundle design was required to optimize the condenser performance and accommodate the anticipated 8% power uprate. This paper will discuss the condenser optimization program from the design state to final installation. Further, it was decided to completely shop fabricate these four titanium tube bundles to minimize the site erection schedule. Each bundle measuring over 44 ft. (13.5 m) long, over 13 ft, (4 m) wide, and nearly 18 ft. (5.5 m) tall, weighed 195,000 lbs (88,450 kg). The weight and size of the bundles created a variety of fabrication, transportation and installation challenges that required extensive advanced planning, scheduling and coordination. The complete installation of the redesigned condenser tube bundles and waterboxes was accomplished during the Fourteenth Refueling Outage of ANO-1 in 1997.

Edgell, D.; Davidian, A.

1999-07-01T23:59:59.000Z

302

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington  

Broader source: Energy.gov [DOE]

This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOEs Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interiors Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

303

Waste minimization plan construction and operation of the replacement cross-site transfer system, project W-058  

SciTech Connect (OSTI)

This report addresses the research and development of a waste minimization plan for the construction and operation of Project W-058, Replacement of the Cross-Site Transfer System, on the Hanford Site. The plan is based on Washington Administrative Code (WAC) 173-307, Plans. The waste minimization plan identifies areas where pollution prevention/waste minimization principles can be incorporated into the construction and operation of the cross-site transfer system.

Boucher, T.D.

1996-04-01T23:59:59.000Z

304

The IAEA Workshop on Requirements and Potential Technologies for Replacement of 3He Detectors in IAEA Safeguards Applications  

SciTech Connect (OSTI)

From 22 24 March, 2011, the International Atomic Energy Agency (IAEA) held an international workshop to address the question of a possible replacement for helium-3 based neutron detectors. Within this wider scope, the workshop was focused on those applications used in IAEA verification activities. There were two principle objectives of the workshop: 1) to determine the specific requirements that a potential replacement technology would have to satisfy, and 2) to identify alternative detector technologies that appear promising for meeting those requirements. The workshop was successful in achieving both objectives. A set of detailed and quantitative specifications was developed and achieved a general consensus among the conference participants. These included operational considerations such as temperature stability, safety, weight, and cost in addition to a number of performance requirements. The performance requirements were derived from an analysis of the spectrum of IAEA applications that use neutron detectors. After analyzing these applications, it was determined that the most common application for 3He detectors was for neutron coincidence counting, comprising over 95% of 3He use. The details and rationale for this assessment will be provided. The performance requirements for neutron coincidence counting can be directly calculated from the standard variance expressions. From these, a basic figure of merit (FOM) was developed that can be used to rank various different options. For neutron coincidence counting, the figure of merit is: , where ? is the detection efficiency and is the detector die away time. Both the FOM and the calculations will be presented. The full list of requirements is included in this paper. The second purpose of the workshop was to identify promising replacement technologies. There were multiple presentations of candidate detection technologies over the course of the workshop, covering a wide spectrum of approaches and detection physics. These technologies were judged relative to the performance of a 3He-based system, as well as its ability to meet the replacement technology requirements as developed in this workshop. The paper will present a summary of this assessment.

Pickrell, Mark; Lavietes, Anthony; Gavron, Victor A.; Henzlova, D.; Joyce, Malcolm J.; Kouzes, Richard T.; Menlove, H. O.

2013-01-01T23:59:59.000Z

305

Design and development of a 3He replacement safeguards neutron counter based on 10B-lined proportional detector technology  

SciTech Connect (OSTI)

This presentation represents an overview of the experimental evaluation of a boron-lined proportional technology performed within an NA-241 sponsored project on testing of boron-lined proportional counters for the purpose of replacement of {sup 3}He technologies. The presented boron-lined technology will be utilized in a design of a full scale safeguards neutron coincidence counter. The design considerations and the Monte Carlo performance predictions for the counter are also presented.

Henzlova, Daniela [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Menlove, Howard O. [Los Alamos National Laboratory; Swinhoe, Martyn T. [Los Alamos National Laboratory; Rael, Carlos D. [Los Alamos National Laboratory; Martinez, Isaac P. [Los Alamos National Laboratory; Marlow, Johnna B. [Los Alamos National Laboratory

2012-07-16T23:59:59.000Z

306

Advanced Pipe Replacement Procedure for a Defective CRDM Housing Nozzle Enables Continued Normal Operation of a Nuclear Power Plant  

SciTech Connect (OSTI)

During the 2003 outage at the Ringhals Nuclear Plant in Sweden, a leak was found in the vicinity of a Control Rod Drive Mechanism (CRDM) housing nozzle at Unit 1. Based on the ALARA principle for radioactive contamination, a unique repair process was developed. The repair system includes utilization of custom, remotely controlled GTAW-robots, a CNC cutting and finishing machine, snake-arm robots and NDE equipment. The success of the repair solution was based on performing the machining and welding operations from the inside of the SCRAM pipe through the CRDM housing since accessibility from the outside was extremely limited. Before the actual pipe replacement procedure was performed, comprehensive training programs were conducted. Training was followed by certification of equipment, staff and procedures during qualification tests in a full scale mock-up of the housing nozzle. Due to the ingenuity of the overall repair solution and training programs, the actual pipe replacement procedure was completed in less than half the anticipated time. As a result of the successful pipe replacement, the nuclear power plant was returned to normal operation. (authors)

Gilmore, Geoff; Becker, Andrew [Climax Portable Machine Tools, Inc., 2712 East Second Street, Newberg, OR 97132 (United States)

2006-07-01T23:59:59.000Z

307

222-S radioactive liquid waste line replacement and 219-S secondary containment upgrade, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is proposing to: (1) replace the 222-S Laboratory (222-S) radioactive liquid waste drain lines to the 219-S Waste Handling Facility (219-S); (2) upgrade 219-S by replacing or upgrading the waste storage tanks and providing secondary containment and seismic restraints to the concrete cells which house the tanks; and (3) replace the transfer lines from 219-S to the 241-SY Tank Farm. This environmental assessment (EA) has been prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] 1500-1508), and the DOE Implementing Procedures for NEPA (10 CFR 1021). 222-S is used to perform analytical services on radioactive samples in support of the Tank Waste Remediation System and Hanford Site environmental restoration programs. Activities conducted at 222-S include decontamination of analytical processing and support equipment and disposal of nonarchived radioactive samples. These activities generate low-level liquid mixed waste. The liquid mixed waste is drained through pipelines in the 222-S service tunnels and underground concrete encasements, to two of three tanks in 219-S, where it is accumulated. 219-S is a treatment, storage, and/or disposal (TSD) unit, and is therefore required to meet Washington Administrative Code (WAC) 173-303, Dangerous Waste Regulations, and the associated requirements for secondary containment and leak detection. The service tunnels are periodically inspected by workers and decontaminated as necessary to maintain as low as reasonably achievable (ALARA) radiation levels. Although no contamination is reaching the environment from the service tunnels, the risk of worker exposure is present and could increase. 222-S is expected to remain in use for at least the next 30 years to serve the Hanford Site environmental cleanup mission.

NONE

1995-01-01T23:59:59.000Z

308

Text-Alternative Version: The L Prize-Winning LED A19 ReplacementWhat Commercial Building Owners/Operators Can Expect in 2012  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the "The L Prize-Winning LED A19 ReplacementWhat Commercial Building Owners/Operators Can Expect in 2012" webcast, held January 18, 2012.

309

EA-1793: Replacement Capability for Disposal of Remote-handled Low-level Waste Generated at the Department of Energy's Idaho Site  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017.

310

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 A 13T CMOS Hardened Memory Cell for  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) ray neutrons and -particles [1].These energy particles travel through the silicon bulk and create

Ayers, Joseph

311

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--The aggressive scaling of CMOS into the deep  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) particles travelling through the silicon bulk can create minority carriers. These carriers may be collected

Ayers, Joseph

312

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Analysis and Design of Nanoscale CMOS  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) ray neutrons and -particles [1]. These energy particles travel through the silicon bulk and create

Ayers, Joseph

313

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--Magnetic sensors capable of detecting tiny ac  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) , PA 16802 USA. temperature and ultra-sensitive magnetometers. Such bulk sensors constructed from ME

Yener, Aylin

314

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--The smart grid paradigm is set to revolutionize  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) from tens of kilovolts to hundreds of kilovolts for transmission of bulk energy over long distances

Atkinson, Robert C

315

Development of a pilot safety information document (PSID) for the replacement of radioactive liquid waste treatment facility at Los Alamos National Laboratory  

E-Print Network [OSTI]

Based on recent decisions made by Los Alamos National Laboratory concerning the development of site-wide National Environmental Policy Act documents, an effort was undertaken to develop a Pilot Safety Information Document (PSID) for the replacement...

Selvage, Ronald Derek

1995-01-01T23:59:59.000Z

316

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final  

E-Print Network [OSTI]

Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the Wisconsin Canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

317

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) 48" Pipeline Replacing Wisconsin Canal Preliminary  

E-Print Network [OSTI]

TR-220 May 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) 48" Pipeline Replacing Wisconsin Canal Preliminary M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant... John R. C. Robinson Michael C. Popp Texas Water Resources Institute Texas A&M University TR-220 May 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) 48" Pipeline Replacing...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

318

Evaluation of lysine deficient grower diets for heavy breed replacement pullets and a comparison of sorghum grains and corn as a carbohydrate source for broiler-breeder hens  

E-Print Network [OSTI]

EVALUATION OF LYSINE DEFICIENT GROWER DIETS FOR HEAVY BREED REPLACEMENT PULLETS AND A COMPARISON OF SORGHUM GRAINS AND CORN AS A CARBOHYDRATE SOURCE FOR BROILER-BREEDER HENS A Thesis ALAN TOLAN Submitted to the Graduate College of the Texas... ARM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE January 1967 Major Subject: Animal Nutrition EVALUATION OF LYSINE DEFICIENT GROWER DIETS FOR HEAVY BREED REPLACEMENT PULLETS AND A COMPARISON OF SORGHUM...

Tolan, Alan

1967-01-01T23:59:59.000Z

319

New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report  

SciTech Connect (OSTI)

Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

Kinney, L.F.; Lewis, G. [Synertech Systems Corp., Syracuse, NY (United States); Pratt, R.G.; Miller, J. [Pacific Northwest National Lab., Richland, WA (United States)

1997-08-01T23:59:59.000Z

320

Rotordynamic force coefficients of pocket damper seals  

E-Print Network [OSTI]

(Back Cap) Lubrication and Cooling Air Piston Cylinder Piston Pressurized Air (115 psi) Pedestal Misaligned Slave Bearing Carrier Slave Bearing Lock Washer Tie Bolt Teflon Ring Seals Spacer Damper Seal Housing Pocket Damper Seal O-Ring Seal Figure 6... by providing engineers with experimental results of PDS that are applicable to the operating conditions observed in the industry. Therefore, unlike previous tests conducted on PDS, the present tests are performed at high inlet pressures (1,000 psi), adequate...

Ertas, Bugra Han

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Experimental Performance of R-1234yf and R-1234ze as Drop-in Replacements for R-134a in Domestic Refrigerators  

SciTech Connect (OSTI)

Concerns about anthropogenic climate change have generated an interest in low global warming potential (GWP) refrigerants and have spawned policies and regulations that encourage the transition to low GWP refrigerants. Recent research has largely focused on hydrofluoroolefins (HFOs), including R-1234yf (GWP = 4) as a replacement for R-134a (GWP = 1430) in automotive air-conditioning applications. While R-1234yf and R-1234ze (GWP = 6) have been investigated theoretically as a replacements for R-134a in domestic refrigeration, there is a lack of experimental evidence. This paper gives experimental performance data for R-1234yf and R-1234ze as drop-in replacements for R134a in two household refrigerators one baseline and one advanced technology. An experiment was conducted to evaluate and compare the performance of R-134a to R-1234yf and R-1234ze, using AHAM standard HRF-1 to evaluate energy consumption. These refrigerants were tested as drop-in replacements, with no performance enhancing modifications to the refrigerators. In Refrigerator 1 and 2, R-1234yf had 2.7% and 1.3% higher energy consumption than R-134a, respectively. This indicates that R-1234yf is a suitable drop-in replacement for R-134a in domestic refrigeration applications. In Refrigerator 1 and 2, R-1234ze had 16% and 5.4% lower energy consumption than R-134a, respectively. In order to replace R-134a with R-1234ze in domestic refrigerators the lower capacity would need to be addressed, thus R-1234ze might not be suitable for drop-in replacement.

Karber, Kyle M [ORNL] [ORNL; Abdelaziz, Omar [ORNL] [ORNL; Vineyard, Edward Allan [ORNL] [ORNL

2012-01-01T23:59:59.000Z

322

Conceptual Design for Replacement of the DTL and CCL with Superconducting RF Cavities in the Spallation Neutron Source Linac  

SciTech Connect (OSTI)

The Spallation Neutron Source Linac utilizes normal conducting RF cavities in the low energy section from 2.5 MeV to 186 MeV. Six Drift Tube Linac (DTL) structures accelerate the beam to 87 MeV, and four Coupled Cavity Linac (CCL) structures provide further acceleration to 186 MeV. The remainder of the Linac is comprised of 81 superconducting cavities packaged in 23 cryomodules to provide final beam energy of approximately 1 GeV. The superconducting Linac has proven to be substantially more reliable than the normal conducting Linac despite the greater number of stations and the complexity associated with the cryogenic plant and distribution. A conceptual design has been initiated on a replacement of the DTL and CCL with superconducting RF cavities. The motivation, constraints, and conceptual design are presented.

Champion, Mark S [ORNL] [ORNL; Doleans, Marc [ORNL] [ORNL; Kim, Sang-Ho [ORNL] [ORNL

2013-01-01T23:59:59.000Z

323

An assessment of alternatives for replacing Freon 113 in bench type electrical circuit board cleaning at Fermi National Accelerator Laboratory  

SciTech Connect (OSTI)

Fermilab is presently phasing out all solvents containing Freon-113 (CFC-113) as part of the continuing Waste Minimization Program. These solvents are used primarily in cleaning the flux off of electronic circuit boards after soldering, specifically in bench type work. Title VI of the Clean Air Act mandates a production phase-out for ozone depleting substances, like CFC-113, by the year 2000. Our study addresses this issue by evaluating and choosing alternative non-CFC solvents to replace the CFC-1 13 solvents at Fermilab. Several potential non-CFC cleaning solvents were tested. The evaluation took place in three parts: controlled experimental evaluation, chemical composition evaluation, and employee performed evaluation. First, we performed a controlled nine-step procedure with the potential solvents where each was evaluated in categories such as cleaning effectiveness, odor, residue, type of output and drying time. Next, we listed the chemical composition of each solvent. We noted which solvents contained hydrochlorofluorocarbons because they are targeted for phase-out in the future and will be recognized as interim solutions only. Finally, after preliminary testing, five solvents were chosen as the best options. These solvents were sent to be tested by Fermilab employees who use such materials. Their opinions are valuable not only because they are knowledgeable in this field, but also because they will be using the solvents chosen to replace the CFC-113 solvents. The results favored two ``best alternatives``: Safezone Solvent Flux Remover by Miller-Stephenson and E-Series CFC Free Flux-Off 2000 by Chemtech. Another possible solution also pursued is the no-clean solder option. In our study, we were not able to thoroughly investigate the many types of no-clean solders because of time and financial constraints. The testing that was done, however, showed that no-clean solder was a viable alternative in many cases.

Isakson, K.; Vessell, A.L.

1994-07-01T23:59:59.000Z

324

Replacing Valuable Papers.  

E-Print Network [OSTI]

Resources; Austin, Texas 78701; (512)441-3355; cost $3. For out-of-state or country, obtain a copy of: Where to Write for Birth and Death Records - U.S. and Outlying Areas. HE 20.6202 B53/978 or Where to Write for Birth and Death Certificates of U.... For Mastercharge, Visa, American Express or oil company credit cards, contact a bank or service station which handles new applications for the cor rect address. Birth certificates For births in Texas: Bureau of Vital Statistics; Texas Department of Health...

Anoymous,

1982-01-01T23:59:59.000Z

325

242T FACP replacement  

SciTech Connect (OSTI)

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Fire Protection system functions as required by project criteria. This ATP will test the Pyrotronic CP-400 fire alarm control panel (FACP), and interfaces with the radio fire alarm reporting box, alarm/supervisory initiating devices, and alarm indicating appliances. This document is to certify the installation and testing of the fire alarm control panel and all attached devices to insure the Hanford Fire Dept. receives the proper signals. This fire alarm control panel is located in Bldg. 242T in the 200 W Area of Hanford.

Ferry, M.F.

1994-11-17T23:59:59.000Z

326

2707SX FACP replacement  

SciTech Connect (OSTI)

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Fire Protection system functions as required by project criteria. This ATP will test the Pyrotronic CP-400 fire alarm control panel (FACP), and interfaces with the radio fire alarm reporting box, alarm/supervisory initiating devices, and alarm indicating appliances. This document is to certify the installation of the fire alarm control panel and all attached devices to insure the Hanford Fire Dept. receives the proper signals. This particular fire alarm control panel services Bldg. 2707SX in the 200W Area of Hanford.

Ferry, M.F.

1994-11-17T23:59:59.000Z

327

Rapid bridge deck replacement  

E-Print Network [OSTI]

, Amsterdam, New York. New York Thruway Authority 4 Welded Channel Connection Details, Amsterdam, New York. New York Thruway Authority 5 Shear Key Joint Details. New York Thruway Authority . . . 6 Welded Stud Connection Details, Albany, New York. New... 35 40 41 47 50 55 25 Curing of Precast Concrete Panels 56 26 Welding of Shear Studs to Model Stringers . . . . . . . . . . . . . 27 Gradation Chart of Sandblasting Sand for Epoxy Mortar . 60 66 28 Hydraulic Pump used for Loading Rams 71 29...

Osegueda, Roberto Alejandro

1983-01-01T23:59:59.000Z

328

UTILITIES -STOKER BOILER REPLACEMENT  

E-Print Network [OSTI]

HUGHESAVE COUNTRY CL UBBLVD GRAEBER ST BIG BLU ESTEMCOURT LI TTLE BLUESTEM COURT CO LLEGE MAPLE, WILLOW

Mayfield, John

329

Centrifuges Replacement Study Proposal  

E-Print Network [OSTI]

characteristics, features of equipment, auxiliaries furnished, overall dims., mat?ls. of constr., est. wt. and complete motor data. 3 3 8 2 NOISE LEVEL DATA for all equipment generating a sound level of 80 DBA or higher, at 3 feet distance... power unit. Meets all requirements 1.3.17 Vibration monitor. Meets all requirements 1.3.18 Transport lock. Meets all requirements 1.3.19 Variable frequency drive system with drive motor and v-belt drive with guard. Meets all requirements 1...

Iqbal, Muhammad

2005-12-16T23:59:59.000Z

330

Filter Replacement Activities Complete  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField Office Programs forDecemberLessonsJoint4, 2014

331

Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

Not Available

1993-09-01T23:59:59.000Z

332

Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana  

SciTech Connect (OSTI)

The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

N /A

2004-08-31T23:59:59.000Z

333

Replacement of the old Mass Storage System by a solution that supports the scientific and operational developments over the next 10 years  

E-Print Network [OSTI]

Replacement of the old Mass Storage System by a solution that supports the scientific to the turnkey delivery of the Mass Storage System (delivery, installation and implementation) the solution also includes the migration of the content of the present to the new Mass Storage System and de- commissioning

Haak, Hein

334

Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated.

NONE

1995-09-01T23:59:59.000Z

335

Charge-transfer-induced suppression of galvanic replacement and synthesis of (Au-Ag)-Au double shell nanoparticles for highly uniform, robust and sensitive bioprobes  

SciTech Connect (OSTI)

The synthesis of double shell (Au-Ag)-Au nanoparticles is accomplished through suppression of the galvanic replacement reaction caused by an electron transfer phenomenon. The resulting nanoparticles are monodisperse with a thin and uniform second Au shell. These particles are ultimately expected to lead to sensitive probes for biomolecular sensing and diagnostics.

Dao Thi Ngoc Anh; Singh, Prerna; Shankar, Cheshta; Mott, Derrick; Maenosono, Shinya [Japan Advanced Institute of Science and Technology, 1-1 Asahidai, Nomi, Ishikawa 923-1292 (Japan)

2011-08-15T23:59:59.000Z

336

MesoNetHS: A Mesoscopic Simulation Model of a Router-Level Internet-like Network with High Speed TCP Replacements  

E-Print Network [OSTI]

MesoNetHS: A Mesoscopic Simulation Model of a Router-Level Internet-like Network with High Speed TCP Replacements MesoNetHS is a mesoscopic (medium scale) simulation model of a router-level Internet of a larger transfer and associated multiplier on file size. During simulation, model state is captured

337

High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

Not Available

1993-06-01T23:59:59.000Z

338

Replacing a 252Cf source with a neutron generator in a shuffler - a conceptual design performed with MCNPX  

SciTech Connect (OSTI)

The {sup 252}Cf shuffler has been widely used in nuclear safeguards and radioactive waste management to assay fissile isotopes, such as {sup 235}U or {sup 239}Pu, present in a variety of samples, ranging from small cans of uranium waste to metal samples weighing several kilograms. Like other non-destructive assay instruments, the shuffler uses an interrogating neutron source to induce fissions in the sample. Although shufflers with {sup 252}Cf sources have been reliably used for several decades, replacing this isotopic source with a neutron generator presents some distinct advantages. Neutron generators can be run in a continuous or pulsed mode, and may be turned off, eliminating the need for shielding and a shuffling mechanism in the shuffler. There is also essentially no dose to personnel during installation, and no reliance on the availability of {sup 252}Cf. Despite these advantages, the more energetic neutrons emitted from the neutron generator (141 MeV for D-T generators) present some challenges for certain material types. For example when the enrichment of a uranium sample is unknown, the fission of {sup 238}U is generally undesirable. Since measuring uranium is one of the main uses of a shuffler, reducing the delayed neutron contribution from {sup 238}U is desirable. Hence, the shuffler hardware must be modified to accommodate a moderator configuration near the source to tailor the interrogating spectrum in a manner which promotes sub-threshold fissions (below 1 MeV) but avoids the over-moderation of the interrogating neutrons so as to avoid self-shielding. In this study, where there are many material and geometry combinations, the Monte Carlo N-Particle eXtended (MCNPX) transport code was used to model, design, and optimize the moderator configuration within the shuffler geometry. The code is then used to evaluate and compare the assay performances of both the modified shuffler and the current {sup 252}Cf shuffler designs for different test samples. The matrix effect and the non-uniformity of the interrogating flux are investigated and quantified in each case. The modified geometry proposed by this study can serve s a guide in retrofitting shufflers that are already in use.

Schear, Melissa A [Los Alamos National Laboratory; Tobin, Stephen J [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

339

Savorphos as an All Natural Phosphate Replacer in Water and Oil Based Marinades for Rotisserie Birds and Boneless-Skinless Breast  

E-Print Network [OSTI]

loss, and increased stability of batter in pork-beef frankfurter. However, the use of these replacers is limited because they may mask desirable flavors, impart undesirable textures, and non-traditional ingredients are not usually accepted... on labels by costumers (Keeton, 1994). Barbut and Somboonpanyakul (2007) reported that the use of malva nut gum at 0.6% lowers hardness of meat batters due to the high amount of gum hindering protein binding, thus reducing gel strength. Montero et al...

Casco Montenegro, Gerardo

2013-05-03T23:59:59.000Z

340

Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement of

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Performance of T12 and T8 Fluorescent Lamps and Troffers and LED Linear Replacement Lamps CALiPER Benchmark Report  

SciTech Connect (OSTI)

The Department of Energy (DOE) Commercially Available LED Product Evaluation and Reporting (CALiPER) Program was established in 2006 to investigate the performance of light-emitting diode (LED) based luminaires and replacement lamps. To help users better compare LED products with conventional lighting technologies, CALiPER has also performed benchmark research and testing of traditional (i.e., non-LED) lamps and fixtures. This benchmark report addresses standard 4-foot fluorescent lamps (i.e., T12 and T8) and the 2-foot by 4-foot recessed troffers in which they are commonly used. This report also examines available LED replacements for T12 and T8 fluorescent lamps, and their application in fluorescent troffers. The construction and operation of linear fluorescent lamps and troffers are discussed, as well as fluorescent lamp and fixture performance, based on manufacturer data and CALiPER benchmark testing. In addition, the report describes LED replacements for linear fluorescent lamps, and compares their bare lamp and in situ performance with fluorescent benchmarks on a range of standard lighting measures, including power usage, light output and distribution, efficacy, correlated color temperature, and the color rendering index. Potential performance and application issues indicated by CALiPER testing results are also examined.

Myer, Michael; Paget, Maria L.; Lingard, Robert D.

2009-01-16T23:59:59.000Z

342

Alternatives to diesel fuel in California - fuel cycle energy and emission effects of possible replacements due to the TAC diesel particulate decision.  

SciTech Connect (OSTI)

Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible mid-course strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression-ignition by spark-ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21% above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7% above projected (total) consumption level. In the second case, compression-ignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case the authors estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOX emissions, though all scenarios bring about PM{sub 10} reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

Saricks, C. L.; Rote, D. M.; Stodolsky, F.; Eberhardt, J. J.

1999-12-03T23:59:59.000Z

343

Alternatives to Diesel Fuel in California - Fuel Cycle Energy and Emission Effects of Possible Replacements Due to the TAC Diesel Particulate Decision  

SciTech Connect (OSTI)

Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel, per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible ''mid-course'' strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression ignition by spark ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21 percent above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7 percent above projected (total) consumption level. In the second case, ressionignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case we estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOx emissions, though all scenarios bring about PM10 reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

Christopher L. Saraicks; Donald M. Rote; Frank Stodolsky; James J. Eberhardt

2000-05-01T23:59:59.000Z

344

Salt spray testing of sacrificial and barrier type coatings for the purpose of finding a corrosion resistant and environmentally acceptable replacement for cadmium plate  

SciTech Connect (OSTI)

Cadmium plate is used to protect various components of offshore oil and gas production equipment from surface marine environments such as salt spray. This research project was performed to find an environmentally acceptable coating which provides equivalent or superior resistance to surface marine corrosion when compared to cadmium plate. In order to find a replacement for cadmium plate, a large number of sacrificial and barrier type coatings were exposed to an accelerated salt spray test in accordance with ASTM B117-94. The only sacrificial coating which resisted 1,000 hours of accelerated salt spray testing without any indication of failure was the 0.0006-in. thick zinc-nickel plate with an olive drab chromate treatment. Based on these test results, zinc-nickel plate is recommended as a corrosion resistant and environmentally acceptable replacement for cadmium plate for use in surface marine environments. Electroless nickel coatings with a minimum applied thickness of 0.002-in. also resisted 1,000 hours of accelerated salt spray testing without indication of failure. Electroless nickel is not recommended for corrosion resistance in salt spray environments for two reasons. Electroless nickel is susceptible to microcracking when heat treated at moderate to high temperatures. Heat treatment improves the hardness and resultant wear resistance of the coating. Microcracking will compromise the integrity of the coating resulting in pitting, cracking or crevice corrosion of the substrate in corrosive environments. Secondly, any significant mechanical damage to the coating or disbonding of the coating substrate interface will also result in corrosive attack of the substrate.

Schultz, E.J.; Haeberle, T.

1996-12-31T23:59:59.000Z

345

Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana  

SciTech Connect (OSTI)

DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on the analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.

N /A

2004-08-31T23:59:59.000Z

346

Monitoring and evaluation of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached houses in Austin, Texas  

SciTech Connect (OSTI)

The US DOE initiated this project to evaluate the performance of an air conditioner retrofit program in Austin, Texas. The City's Austin's Resource Management Department pursued this project to quantify the retrofit effect of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached homes. If successfully implemented, this retrofit program could help defer construction of a new power plant which is a major goal of this department. The project compares data collected from 12 houses during two cooling seasons under pre-retrofit and then post-retrofit air conditioner units. The existing low-efficiency air conditioners were monitored during the 1987 cooling season, replaced during the 1987--88 heating season with new, smaller sized, high-efficiency units, and then monitored again during the 1988 cooling season. Results indicated that the air conditioner retrofits reduce the annual air conditioner electric consumption and peak electric demand by an average of 38%. When normalized to the nominal capacity of the air conditioner, average demand savings were 1.12 W/ft{sup 2} and estimated annual energy savings were 1.419 kWh/ft{sup 2}. Individual air conditioner power requirements were found to be a well defined function of outdoor temperature as expected. In the absence of detailed data, estimates of the peak demand reductions of new air conditioners can be made from the manufacturer's specifications. Air conditioner energy consumption proved to be strongly linear as a function of the outdoor temperature as expected when taken as an aggregate. No noticeable differences in the diversity factor of the air conditioner usage were found. Analysis of the retrofit effect using PRISM yields estimates of the reduction in normalized annual consumption (NAC) and annual cooling consumption of 12% and 30%. 2 refs., 11 figs., 17 tabs.

Burns, R.; Hough, R.E. (Fleming (W.S.) and Associates, Inc., Syracuse, NY (United States))

1991-10-01T23:59:59.000Z

347

Scheduling screening inspections for replaceable and non-replaceable systems  

E-Print Network [OSTI]

. For instance, the American Cancer Society recommends three tests to detect signs of breast cancer: mammography, clinical breast exam and breast self-examination. Additionally, the American Medical Womens Association recommends annual mammography and clin- ical... cancer. For instance, mammography?s ability to detect a breast cancer when it is already started is estimated to 77.6% in (Houssami, Ciatto, Irwig, Simpson and Macaskill, 2002). Therefore, when designing screening inspection schedules, the fallibility...

Aral, Bahadir

2009-05-15T23:59:59.000Z

348

Anterior Myocardial Territory May Replace the Heart as Organ at Risk in Intensity-Modulated Radiotherapy for Left-Sided Breast Cancer  

SciTech Connect (OSTI)

Purpose: We investigated whether the heart could be replaced by the anterior myocardial territory (AMT) as the organ at risk (OAR) in intensity-modulated radiotherapy (IMRT) of the breast for patients with left-sided breast cancer. Methods and Materials: Twenty-three patients with left-sided breast cancer who received postoperative radiation after breast-conserving surgery were studied. For each patient, we generated five IMRT plans including heart (H), left ventricle (LV), AMT, LV+AMT, and H+LV as the primary OARs, respectively, except both lungs and right breast, which corresponded to IMRT(H), IMRT(LV), IMRT(AMT), IMRT(LV+AMT), and IMRT(H+LV). For the planning target volumes and OARs, the parameters of dose-volume histograms were compared. Results: The homogeneity index, conformity index, and coverage index were not compromised significantly in IMRT(AMT), IMRT(LV) and IMRT(LV+ AMT), respectively, when compared with IMRT(H). The mean dose to the heart, LV, and AMT decreased 5.3-21.5% (p < 0.05), 19.9-29.5% (p < 0.05), and 13.3-24.5% (p < 0.05), respectively. Similarly, the low (e.g., V5%), middle (e.g., V20%), and high (e.g., V30%) dose-volume of the heart, LV, and AMT decreased with different levels. The mean dose and V10% of the right lung increased by 9.2% (p < 0.05) and 27.6% (p < 0.05), respectively, in IMRT(LV), and the mean dose and V5% of the right breast decreased significantly in IMRT(AMT) and IMRT(LV+AMT). IMRT(AMT) was the preferred plan and was then compared with IMRT(H+LV); the majority of dose-volume histogram parameters of OARs including the heart, LV, AMT, both lungs, and the right breast were not statistically different. However, the low dose-volume of LV increased and the middle dose-volume decreased significantly (p < 0.05) in IMRT(AMT). Also, those of the right lung (V10%, V15%) and right breast (V5%, V10%) decreased significantly (p < 0.05). Conclusions: The AMT may replace the heart as the OAR in left-sided breast IMRT after breast-conserving surgery to decrease the radiation dose to the heart.

Tan Wenyong [Department of Radiotherapy, Hubei Cancer Hospital, Wuhan (China); Key Laboratory of Molecular Biophysics of the Ministry of Education, College of Life Science and Technology, Huazhong University of Science and Technology, Wuhan (China); Liu Dong [Department of Radiotherapy, Hubei Cancer Hospital, Wuhan (China); Xue Chenbin [Key Laboratory of Molecular Biophysics of the Ministry of Education, College of Life Science and Technology, Huazhong University of Science and Technology, Wuhan (China); Xu Jiaozhen; Li Beihui [Department of Radiotherapy, Hubei Cancer Hospital, Wuhan (China); Chen Zhengwang [Key Laboratory of Molecular Biophysics of the Ministry of Education, College of Life Science and Technology, Huazhong University of Science and Technology, Wuhan (China); Hu Desheng [Department of Radiotherapy, Hubei Cancer Hospital, Wuhan (China); Wang Xionghong, E-mail: tanwyym@yahoo.com.cn [Department of Radiotherapy, Hubei Cancer Hospital, Wuhan (China)

2012-04-01T23:59:59.000Z

349

CHRPR Neutron Board Replacement Manual  

SciTech Connect (OSTI)

This document will walk through the steps to exchange the neutron channel boards with gamma channel boards in the CHRPR box.

Erikson, Rebecca L.; Myjak, Mitchell J.

2013-03-31T23:59:59.000Z

350

Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed reactor system at Building 9212. Draft environmental assessment  

SciTech Connect (OSTI)

The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is Iocated within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The current AHF supply and fluidized-bed reactor systems were designed and constructed more than 40 years ago. Because of their deteriorating condition, the corrosive nature of the materials processed, and the antiquated design philosophy upon which they are based, their long-term reliability cannot be assured. The current AHF supply system cannot mitigate an accidental release of AHF and vents fugitive AHF directly to the atmosphere during operations. the proposed action would reduce the risk of exposing the Y-12 Plant work force, the public, and the environment to an accidental release of AHF and would ensure the continuing ability of the Y-12 Plant to manufacture highly enriched uranium metal and process uranium from retired weapons for storage.

NONE

1995-03-01T23:59:59.000Z

351

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network [OSTI]

, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

352

Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energys Idaho Site  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

353

How to upgrade your incandescent light bulbs Many people are choosing replacements for their standard incandescent light bulbs to save money or energy, because they've heard of new LED  

E-Print Network [OSTI]

How to upgrade your incandescent light bulbs Many people are choosing replacements for their standard incandescent light bulbs to save money or energy, because they've heard of new LED options, or in anticipation of the phase-out of standard incandescent bulbs in the U.S. starting in 2012. If you've shopped

Bystroff, Chris

354

Investigation into environmentally friendly alternative cleaning processes for hybrid microcircuits to replace vapor degreasing with 1,1,1-trichloroethane. Final report  

SciTech Connect (OSTI)

Two cleaning processes, one aqueous and one nonaqueous, were investigated as potential replacements for the vapor degreasing process using 1,1,1 trichloroethane (TCA) for hybrid microcircuit assemblies. The aqueous process was based upon saponification chemistry. A 10% solution of either Kester 5768 or Armakleen 2001, heated to 140 F, was sprayed on the hybrid at 450 psig and a flow rate of 5 gpm through a specially designed nozzle which created microdroplets. The nonaqueous process was based upon dissolution chemistry and used d-limonene as the solvent in an immersion and spray process. The d-limonene solvent was followed by an isopropyl alcohol spray rinse to remove the excess d-limonene. The aqueous microdroplet process was found to be successful only for solder reflow profiles that did not exceed 210 C. Furthermore, removal of component marking was a problem and the spray pressure had to be reduced to 130 psig to eliminate damage to capacitor end caps. The d-limonene cleaning was found to be successful for solder reflow temperature up to 250 C when using a four-step cleaning process. The four steps included refluxing the hybrid at 80 C, followed by soaking the hybrid in d-limonene which is heated to 80 C, followed by spray cleaning at 80 psig with room temperature d-limonene, followed by spray cleaning at 80 psig with room temperature IPA was developed to remove residual flux from the hybrid microcircuits. This process was the most robust and most closely matched the cleaning ability of TCA.

Adams, B.E.

1997-02-01T23:59:59.000Z

355

DOE Media Advisory- DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energys Idaho Site  

Broader source: Energy.gov [DOE]

In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energys Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energys Idaho Site.

356

EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico  

Broader source: Energy.gov [DOE]

This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

357

Economic and Financial Costs of Saving Water and Energy: Preliminary Analysis for Hidalgo County Irrigation District No. 2 (San Juan) Replacement of Pipeline Units I-7A, I-18, and I-22  

E-Print Network [OSTI]

for Hidalgo County Irrigation District No. 2 (San Juan) Replacement of Pipeline Units I-7A, I-18, and I-22 Introduction This report documents the analysis conducted for a project anticipated to be proposed to the Border Environmental Cooperative Commission...). Installation Periods: It is anticipated that it will take one year after purchase and project initiation for each of the three new pipeline segments to be installed and fully implemented (Table 4). No loss of operations or otherwise adverse impacts...

Sturdivant, Allen W.; Rister, M. Edward; Lacewell, Ronald D.

358

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect (OSTI)

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

359

Energy Efficient Buffer Cache Replacement Jianhui Yue  

E-Print Network [OSTI]

chips. Accordingly energy saved due to higher cache hit rates may not make up for extra energy cost that achieve energy saving at little sacrifice to cache hit rates. The key idea of our algorithms is that we in terms of hit rates but potentially has large energy salvage. The rest of this paper is organized

Zhu, Yifeng

360

Solid State Replacement of Rotating Mirror Cameras  

SciTech Connect (OSTI)

Rotating mirror cameras have been the mainstay of mega-frame per second imaging for decades. There is still no electronic camera that can match a film based rotary mirror camera for the combination of frame count, speed, resolution and dynamic range. The rotary mirror cameras are predominantly used in the range of 0.1 to 100 micro-seconds per frame, for 25 to more than a hundred frames. Electron tube gated cameras dominate the sub microsecond regime but are frame count limited. Video cameras are pushing into the microsecond regime but are resolution limited by the high data rates. An all solid state architecture, dubbed ''In-situ Storage Image Sensor'' or ''ISIS'', by Prof. Goji Etoh, has made its first appearance into the market and its evaluation is discussed. Recent work at Lawrence Livermore National Laboratory has concentrated both on evaluation of the presently available technologies and exploring the capabilities of the ISIS architecture. It is clear though there is presently no single chip camera that can simultaneously match the rotary mirror cameras, the ISIS architecture has the potential to approach their performance.

Frank, A M; Bartolick, J M

2006-08-25T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Minimize environmental impacts when replacing underground pipe  

SciTech Connect (OSTI)

A US refiner urgently needed to repair a 40-year-old oily-water sewer system without disrupting processing operations. Equally important, the refiner wanted to minimize soil and groundwater contamination. In this case history, the refiner elected to use an alternative method--trenchless rehabilitation--to make required underground repairs.

Miller, L.R. [Ashland Petroleum Co., Catlettsburg, KY (United States); Kroll, T.R. [Insituform Technologies, Inc., Memphis, TN (United States)

1997-02-01T23:59:59.000Z

362

Collector main replacement at Indianapolis Coke  

SciTech Connect (OSTI)

Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.

Sickle, R.R. Van

1997-12-31T23:59:59.000Z

363

Developing Business Case for Electrical System Replacement  

E-Print Network [OSTI]

such as infrared thermography, oil testing insulation power factor testing, and partial discharge testing should be performed. The test data should be trended to identify failure patterns. 4.2.2 -Switchgear Switchgear failures are caused by high resistance... check the plants Infrared Thermography and Ultrasonic testing procedure to assure that it is adequate. If the plant is not performing such testing on an annual basis, the assessor should make the recommendation that the testing be performed for safe...

Miller, Carles

2006-05-19T23:59:59.000Z

364

Wear of a Total Ankle Replacement.  

E-Print Network [OSTI]

??Osteoarthritis of the ankle is a disease that affects 2% of the population in the United States. The most common current treatment entails fusing the (more)

Fryman, James Craig

2010-01-01T23:59:59.000Z

365

An optimal replacement problem in aluminum production  

E-Print Network [OSTI]

The aluminum production facility operated by ALCOA in Rockdale, Texas produces aluminum in a continuous manufacturing environment using steel carbon-lined smelting pots. As a result of the production process of running electricity through an electrolytic... technique known as dynamic programming, the minimum expected cost can be determined for a finite horizon Markov decision problem. This was accomplished using value iteration, a computer program written in C language, and data obtained from ALCOA...

Spanks, Lisa Marie

1992-01-01T23:59:59.000Z

366

Replacing the Rare Earth Intellectual Capital  

SciTech Connect (OSTI)

The rare earth crisis slowly evolved during a 10 to 15 year period beginning in the mid-1980s, when the Chinese began to export mixed rare earth concentrates. In the early 1990s, they started to move up the supply chain and began to export the individual rare earth oxides and metals. By the late 1990s the Chinese exported higher value products, such as magnets, phosphors, polishing compounds, catalysts; and in the 21st century they supplied finished products including electric motors, computers, batteries, liquid-crystal displays (LCDs), TVs and monitors, mobile phones, iPods and compact fluorescent lamp (CFL) light bulbs. As they moved to higher value products, the Chinese slowly drove the various industrial producers and commercial enterprises in the US, Europe and Japan out of business by manipulating the rare earth commodity prices. Because of this, the technically trained rare earth engineers and scientists who worked in areas from mining to separations, to processing to production, to manufacturing of semifinished and final products, were laid-off and moved to other fields or they retired. However, in the past year the Chinese have changed their philosophy of the 1970s and 1980s of forming a rare earth cartel to control the rare earth markets to one in which they will no longer supply the rest of the world (ROW) with their precious rare earths, but instead will use them internally to meet the growing demand as the Chinese standard of living increases. To this end, they have implemented and occasionally increased export restrictions and added an export tariff on many of the high demand rare earth elements. Now the ROW is quickly trying to start up rare earth mines, e.g. Molycorp Minerals in the US and Lynas Corp. in Australia, to cover this shortfall in the worldwide market, but it will take about five years for the supply to meet the demand, even as other mines in the ROW become productive. Unfortunately, today there is a serious lack of technically trained personnel to bring the entire rare earth industry, from mining to original equipment manufacturers (OEM), up to full speed in the next few years. Accompanying this decline in technical expertise, innovation and new products utilizing rare earth elements has slowed dramatically, and it may take a decade or more to recapture America's leading role in technological advancements of rare earth containing products. Before the disruption of the US rare earth industry, about 25,000 people were employed in all aspects of the industry from mining to OEM. Today, only about 1,500 people are employed in these fields. The ratio of non-technically trained persons to those with college degrees in the sciences or engineering varies from about 8 to 1 to about 4 to 1, depending on the particular area of the industry. Assuming an average of 6 to 1, the number of college degree scientists and engineers has decreased from about 4,000 to 250 employed today. In the magnetic industry the approximate numbers are: 6,000 total with 750 technically trained people in the 1980s to 500 totally employed today of which 75 have degrees. The paucity of scientists and engineers with experience and/or training in the various aspects of production and commercialization of the rare earths is a serious limitation to the ability of the US to satisfy its own needs for materials and technologies (1) to maintain our military strength and posture, (2) to assume leadership in critical energy technologies, and (3) to bring new consumer products to the marketplace. The lack of experts is of even greater national importance than the halting in the 1990s and the recent restart of the mining/benification/separation effort in the US; and thus governmental intervention and support for at least five to 10 years will be required to ameliorate this situation. To respond quickly, training programs should be established in conjunction with a national research center at an educational institution with a long tradition in multiple areas of rare earth and other critical elements research and technology. This center should

Gschneidner, Jr., Karl

2011-04-01T23:59:59.000Z

367

Optimization Online - Optimal scheduling for replacing perimeter ...  

E-Print Network [OSTI]

Oct 2, 2014 ... Citation: Technical Report LiTH-MAT-R2014/09SE, Department of Mathematics, Linkoping University, Sweden, August/2014. Download:...

Oleg Burdakov

2014-10-02T23:59:59.000Z

368

build - A Directory Savvy Replacement for Make  

SciTech Connect (OSTI)

All but the most trivial software packages are generally constructed from multiple source files with many steps being required to generate lexer and parser source files, compile the numerous source files, assemble libraries from object files, and link object files and libraries to form the binary executable application. During the development process, the construction process may be repeated many times as source code is modified requiring the application to be rebuilt. To address this problem the original make tool was developed. However this tool was developed when applications were rather simple with a limited number of source files in single directories. Few header files outside of the standard system header files were used. The graph formed by the file-to-file dependencies was generally simple with little cross branching and limited depth. The increased complexity of modern software systems has made the traditional make tool less capable of managing the problem. Good software development practices have led to more and more source files arranged in directory hierarchies. Modular development of the software has resulted in the proliferation of developer implemented header files and libraries that are part of the application. Code reuse and object oriented design has made the problem even worse by hiding the necessity to recompile source files. In short, the dependency graph has become much more complex, less a tree and more lattice-like. Keeping track of these dependencies rapidly becomes difficult with the increasing complexity of the software. In addition the shear volume of source code has increased the need to avoid unnecessary compiles or relinks. The increased number of source files to be compiled has also increased the opportunity for parallelism but the increased complexity of the directory hierarchy and file-file dependencies has at the same time made it harder to exploit parallelism. This paper gives a brief introduction to build - an improved implementation of make. A number of common issues are presented that contrast how build and make are used. In addition a number of new features provided by build are described. This presentation is by no means a complete description of build; a separate document is available that serves as a reference and user's guide.

Reus, J F

2005-01-10T23:59:59.000Z

369

Sampling with unequal probabilities and without replacement  

E-Print Network [OSTI]

. The method described. by Rao (9) is probably the fastest. This method uses N random numbers to per- mute N items. If N c 10, the N random numbers 0 ~ R. c 9 are listed. , i. e. R R . . . RN 2 The items are then ordered. according to the Ri, as in Table...2)=H(I&N2)+R(I&N3) 2 R(I&N2)=R(I&N2)/ANN C COMPUTES THE VARIANCE (VAR) OF A PARTICULAR PERMUTATION RR=O SMSQ, =SUMA??2 RATIO=SUMS/SUMA 188 DO 83 I=1, N HSQ=(H(I, NN2)-RATIO)??2 83 HH=HSQ"H(I, NN1)+RH VAR=SMSQ?HH VARAN=VAHAN+VAR AFAC...

Kleibrink, Ronald Gus

2012-06-07T23:59:59.000Z

370

Sustainable LED Fluorescent Light Replacement Technology  

SciTech Connect (OSTI)

Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: Bill-of-Materials (BOM) Builder Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. Environmental Impact Review Designs are comparable across lifecycle phases, subsystems, and environmental impact category, and can be normalized to a userdefined functional unit. Drill-down Review These provide an indepth look at individual lamp designs with the ability to review across subsystem or lifecycle phase.

None

2011-06-30T23:59:59.000Z

371

Remotely replaceable tokamak plasma limiter tiles  

DOE Patents [OSTI]

U-shaped tiles placed end-to-end over a pair of parallel runners have two rods which engage L-shaped slots. A sliding bar between the runners has grooves with clips to retain the rods pressed into receiving legs of the L-shaped slots in the runners. Sliding the bar in the direction of retaining legs of the L-shaped slots latches the tiles in place over the wall. Resilient contact strips under the parallel sides of the U-shaped tile assure thermal and electrical contact with the wall. 6 figs.

Gallix, R.

1987-12-09T23:59:59.000Z

372

Replacing Fluorescent Lightbulbs | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromisingStories » Removing nuclear waste, oneReordering

373

REPLACEMENT LAYING IN MARBLED MURRELETS BRACHYRAMPHUS MARMORATUS  

E-Print Network [OSTI]

MCFARLANE TRANQUILLA, L., BRADLEY, R., PARKER, N., LANK, D. & COOKE, F. Journal: Marine Ornithology ...

374

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee,Energy

375

Retail Replacement Lamps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |Regulation Services System:Affairs,HowReporting andAnnual CALiPER testing

376

Replacing an Oversized and Underloaded Electric Motor  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartmentnews-flashesEnergy by Brian (03-94)1 Konstantin

377

Replaces EIA-459E OMB Control No.  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartment ofColumbusReport #StudyRenewable EnergyPreliminary

378

Vapor pressures of mixtures of CFC-114 with the potential replacement coolants C{sub 4}F{sub 10} and c-C{sub 4}F{sub 8}  

SciTech Connect (OSTI)

The U.S. Enrichment Corporation`s production of isotopically enriched uranium depends solely on two plants which utilize the gaseous diffusion process. This process uses large quantities of CFC-114 as an evaporative coolant. CFC-114, however, will be phased out of production at the end of 1995 due to its potential to deplete stratospheric ozone. A search has been underway for substitutes for a number of years. The initial search (1988-89) for an ozone-friendly, commercially available, chemically compatible substitute yielded two candidates, FC-c318 (c-C{sub 4}F{sub 8}) and FC-3110 (C{sub 4}F{sub 10}). The intended mode of replacing coolant was to stage the new coolant into independent subsystems of the plants, so that some systems would continue to operate on CFC-114, and an increasing number would operate on the new coolant. During that changeover process, the possibility of coolant mixing arises in variety of scenarios. This work was intended to generate sufficient experimental information to be able to predict the vapor pressure of coolant mixtures over the range of operating conditions likely to be found in the diffusion plants. Specifically, vapor pressures were measured over the temperature range 322 to 355 K (120{degrees}F to 180{degrees}F) and over the full range of mole fractions for binary mixtures of CFC-114 with FC-3110, and of CFC-114 with FC-c318.

Trowbridge, L.D. [Oak Ridge K-25 Site, TN (United States); Otey, M.G. [Paducah Gaseous Diffusion Plant, KY (United States)

1994-09-01T23:59:59.000Z

379

Extension and replacement of aspalt cement with sulphur  

E-Print Network [OSTI]

material containing bitumen, sulphur, and mineral matter such as sand, rock, road metal and clinker (41). He recommended preparing the mixture in hot mix plants, and completely filling the voids between aggregate particles with sulphur-asphalt binder... Selection . Aggregate Selection Selection of Asphalt Cement and Sulphur Content 10 13 20 23 23 26 27 28 28 28 33 44 PAGE Selection of Moisture Condition and Compaction Effort . 45 Processing of Sulphur-Asphalt Emulsion (SAE) Binders...

Pickett, Daniel Ernest

1977-01-01T23:59:59.000Z

380

Effects of an Accelerated Diesel Engine Replacement/Retrofit Program  

E-Print Network [OSTI]

and Cackette, T. A. , (2001). Diesel engines: environmentalfrom On-Road Gasoline and Diesel Vehicles. Atmos. Environ.emissions from gasoline- and diesel-powered motor vehicles.

Millstein, Dev E.; Harley, Robert A

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Southwest Concourse Replacement University of Massachusetts at Amherst  

E-Print Network [OSTI]

Kennedy Coolidge HampshireDC Hampden DC CIP SA/G UP CIP A CIP UP SA/G SA SA SA Crampton CIP WD WD SR SR MATERIALS: NORTH Prince SA CIP (Kitty Dukakis Garden) Falmouth Academy, Falmouth, MA Voelcker Park, San Antonio, TXSA UP #12;Thoreau Kennedy Coolidge HampshireDC Hampden DC CIP SA/G UP CIP A CIP UP SA/G SA SA

Massachusetts at Amherst, University of

382

Effects of an Accelerated Diesel Engine Replacement/Retrofit Program  

E-Print Network [OSTI]

D. , (2008). Carbonyl and nitrogen dioxide emissions fromand modeled nitrogen dioxide (NO 2 ) concentrations. Allin the exhaust to nitrogen dioxide (NO 2 ). NO 2 in turn is

Millstein, Dev E.; Harley, Robert A

2009-01-01T23:59:59.000Z

383

AT&T U-verse Gateway Replacement  

E-Print Network [OSTI]

/TV are not responding. Confirm that the Service light is solid green on the Wi-Fi Gateway. If it is, power down ______ Power Cord Need more help? Go online: Visit att.com/uversesupport Call us: Dial 800.288.2020 and ask click when secure. 2a. Check Power. If you have power and the Wi-Fi Gateway is turned on, the Power

Fisher, Kathleen

384

Breeding nuclear fuels with accelerators: replacement for breeder reactors  

SciTech Connect (OSTI)

One application of high energy particle accelerators has been, and still is, the production of nuclear fuel for the nuclear energy industry; tantalizing because it would create a whole new industry. This approach to producing fissile from fertile material was first considered in the early 1950's in the context of the nuclear weapons program. A considerable development effort was expended before discovery of uranium ore in New Mexico put an end to the project. Later, US commitment to the Liquid Metal Fast Breeder Reactors (LMFBR) killed any further interest in pursuing accelerator breeder technology. Interest in the application of accelerators to breed nuclear fuels, and possibly burn nuclear wastes, revived in the late 1970's, when the LMFBR came under attack during the Carter administration. This period gave the opportunity to revisit the concept in view of the present state of the technology. This evaluation and the extensive calculational modeling of target designs that have been carried out are promising. In fact, a nuclear fuel cycle of Light Water Reactors and Accelerator Breeders is competitive to that of the LMFBR. At this time, however, the relative abundance of uranium reserves vs electricity demand and projected growth rate render this study purely academic. It will be for the next generation of accelerator builders to demonstate the competitiveness of this technology versus that of other nuclear fuel cycles, such as LMFBR's or Fusion Hybrid systems. 22 references, 1 figure, 5 tables.

Grand, P.; Takahashi, H.

1984-01-01T23:59:59.000Z

385

Accelerator breeders: will they replace liquid metal fast breeders  

SciTech Connect (OSTI)

Investigation of accelerator breeders at Brookhaven National Laboratory indicate that the AB-LWR fuel cycle is economically competitive with the LMFBR fuel cycle. The same can be said about the accelerator breeder-High Temperature Gas Reactor symbiosis. This system appears to be very competitive with the added real advantage of superior safety and proliferation resistance. This discussion would be incomplete if the real competitor to accelerator breeding was not mentioned, namely Fusion Hybrid Breeding (FHB). Fusion Hybrid Breeding is a nearer option than pure fusion, as the breakeven Q value requirements are much more modest. Fusion Hybrid Breeding, if successful and practical, has the potential for highly efficient fissile fuel breeding, leading to cheaper fuel. The system, however, has yet to be demonstrated scientifically and to be shown commercially feasible. This is in contrast with the AB system which is an extension of proven, state-of-the-art technology with implementation possible within twenty years. 25 references, 4 figures, 5 tables.

Grand, P.; Powell, J.R.; Steinberg, M.; Takahashi, H.

1983-06-01T23:59:59.000Z

386

Quenching and Partitioning Process Development to Replace Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

processing for 3GAHSS in au- tomotive applications. The team will use a combination of deep alloy development experience, designed experiments, computa- tional tools, and...

387

The deep water gas charged accumulator and its possible replacements  

E-Print Network [OSTI]

. The problem may arise when the wellhead is at water depth of more than 3500 ft. In deep water drilling, the accumulators should be placed on the subsea blowout preventer stack to reduce hydraulic response times and provide a hydraulic power supply in case...

Mir Rajabi, Mehdi

2006-04-12T23:59:59.000Z

388

Progammatic mission transformation - chemistry and metallurgy research replacement (CMRR) project  

SciTech Connect (OSTI)

Nuclear posture and policy objectives are: (1) Preventing nuclear proliferation and nuclear terrorism; (2) Reducing the role of nuclear weapons in US national security strategy; (3) Maintaining strategic deterrence and stability at reduced nuclear force levels; (4) Strengthening regional deterrence and reassuring US allies and partners; and (5) Sustaining a safe, secure, and effective nuclear arsenal.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-24T23:59:59.000Z

389

artificial disc replacement: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in three-dimensional discs CERN Preprints Summary: Vortex formation through the Rossby wave instability (RWI) in protoplanetary discs has been invoked to play a role in planet...

390

Drop-in replacement biofuels : meeting the challenge .  

E-Print Network [OSTI]

??This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides (more)

Bhargava, Alok (Alok Kishore)

2011-01-01T23:59:59.000Z

391

Electrodeposited tungsten-nickel-boron: A replacement for hexavalent chromium  

SciTech Connect (OSTI)

Chromium, deposited from acidic solutions of its hexavalent ion, has been the rule for wear resistant, corrosion resistant coatings for many years. Although chromium coatings are durable, the plating process generates air emissions, effluent rinse waters, and process solutions that are toxic, suspected carcinogens, and a risk to human health and the environment. Tungsten-nickel-boron (W-Ni-B) alloy deposition is a potential substitute for hexavalent chrome. It has excellent wear, corrosion, and mechanical properties and also may be less of an environmental risk. This study examines the electroplating process and deposit properties of W-Ni-B and compares them with those of hexavalent chrome.

Steffani, C.; Meltzer, M.

1995-04-01T23:59:59.000Z

392

Cobalt discovery replaces precious metals as industrial catalyst  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- The new material has the highest oxygen reduction reaction (ORR) activity in alkaline media of any non-precious metal catalyst developed to date. Los Alamos research better...

393

DOEEA-1178 Assessment 300 Area Steam Plant Replacement, Hanford...  

Broader source: Energy.gov (indexed) [DOE]

facilities would not be achieved. 5.3.4 Upgrade Central Steam System Impacts from upgrading the central steam system would include a reduction in the operational costs...

394

Simple Maintenance Saves Costly Furnace Repair/Replacement |...  

Broader source: Energy.gov (indexed) [DOE]

furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the...

395

Cobalt discovery replaces precious metals as industrial catalyst  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

synthetic, and renewable energy processes where they accelerate or optimize a mind-boggling array of chemical reactions. Novel cobalt system supports less expensive...

396

Sprinkler Head Replacement (4586), 4/24/2012  

Broader source: Energy.gov (indexed) [DOE]

1021, Subpart D, Appendix B; (5) involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed...

397

Duct Chase Sprinkler Replacement Project (4594), 5/31/2012  

Broader source: Energy.gov (indexed) [DOE]

1021, Subpart D, Appendix B; (5) involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed...

398

Height Replacement of Selected Woody Plants Following Burning or Shredding.  

E-Print Network [OSTI]

for effectively suppressing w e y plants to levels which allow im- proved forage responses from pastures. Although few woody plants are killed by cool-season burns, the live topgrowth is usu- ally r e d u d to near ground level and forage production... descriptions by site. The Claypan Prairie range site is typified by. kparita soils on nemly levd to gerrtlp&loping up- lands in claw p x b i t y to small d r d n a ~ e s . ' Slopes p ubally less than f krceiitt but -On- ally inmeam to-3 m e h t . Wfls...

Hamilton, W.T.; Kitchen, L.M.; Scifres, C.J.

1981-01-01T23:59:59.000Z

399

Glove port retrofit assembly and method of replacing components  

DOE Patents [OSTI]

What is disclosed is a system for retrofitting a sealed enclosure for performing work therein having an outer enclosure assembly configured to be clamped to the outer annular face of a port ring and form a sealed engagement with the outer annular surface of the port ring, a change assembly having an inner ring and an access element wherein the inner ring has a first annular cylinder body that is sized to be slidably received by the port ring and the access element is configured to be sealably and slidably positioned within the first annular cylinder body of the inner ring.

Giesen, Isaac M; Cournoyer, Michael E; Rael, David G

2014-11-18T23:59:59.000Z

400

GAUSSIAN PROCESSES A Replacement for Supervised Neural Networks?  

E-Print Network [OSTI]

of Physics, Cambridge University. Cavendish Laboratory, Madingley Road, Cambridge, CB3 0HE. United Kingdom and Rasmussen (1996) and Gibbs (1997). My lectures feature a sequence of computer demonstrations written

MacKay, David J.C.

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Boron-10 Neutron Detectors for Helium-3 Replacement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to tell the difference between radiation emitted by nuclear materials and naturally occurring gamma radiation emitted by benign cargos, such as bananas. Finally, the United...

402

Replacement Costs and Cleaning & Service Charges for ResidenceHalls  

E-Print Network [OSTI]

Incandescent Light Fixture $130.00 each Incandescent Light Fixture Globe $82.00 each Exit Sign $440.00 each

Shyy, Wei

403

Replacing chemicals in recycle mills with mechanical alternatives  

SciTech Connect (OSTI)

A high-intensity spark fired underwater decomposes a small amount of the water into hydroxyl radicals, which are strong oxidants. These are able to oxidize contaminants such as glue and wood pitch that enter paper recycling mills as a part of the incoming furnish and cost the industry several hundred million dollars. The sparking technique is safe, inexpensive, and is capable of treating large volumes of water, which makes it attractive for mill applications. Several mill trials were run. Sparking caused a decrease in the tack of the deposits in one case. Lower bleach use occurred in two other mills; sparking reduced the degree of ink reattachment to fiber. The payback for either application is attractive. Sparking induced deposition of contaminants in another mill, which is a positive development--if it can be controlled. The technique is also able to degas water and to oxidize odor-causing sulfur compounds. Although one unit has been purchased by a mill, second-order effects caused by the technology needs to be defined further before the technology can be broadly applied.

Institute of Paper Science Technology

2002-07-01T23:59:59.000Z

404

Prioritizing Water Pipe Replacement and Rehabilitation by Evaluating Failure Risk  

E-Print Network [OSTI]

..................................................................... 84 4.3.5.1 Exfoliation Percentage of Coating Materials ................. 84 4.3.6 Changes in EIS Characteristics of Coating Materials in Steel Pipes according to Years of Laying ........................................... 88 4....3.6.1 EIS Measurement ........................................................... 89 4.3.6.1.1 Overview of Electro-Impedance Spectroscopy (EIS) Measurement ......................................... 89 4.3.6.1.2 Principles of EIS...

Lee, Sang Hyun

2012-02-14T23:59:59.000Z

405

artificial joint replacements: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

In 1981,193 joint ventures with the par- ticipation of Japanese capital were operating in 47 nations 152 Joint Degrees & Promotion towards European Students Computer...

406

LONG TERM FILE MIGRATION - PART II: FILE REPLACEMENT ALGORITHMS  

E-Print Network [OSTI]

~~"-' ,m . I 'f'-~I I ,/:? :RIlNG SET r -t j IS) iO" 1C. ~ETNR(LSIZEt>ClIISS)/ '.I~RllNG LJ.J 8DGO Ot\\ YS ~~:\\ j3 1 :in ~ill particular a batch lng OD aEriv~l phenomenon r by

Jay Smith, Alan

2011-01-01T23:59:59.000Z

407

ChangeBehaviors Replace your old toilets and  

E-Print Network [OSTI]

://fcs.tamu.edu/housing/efficient_housing/ water_management/index.php Rio Grande Basin Initiative http://riogrande.tamu.edu/ Energy Star http http://fcs.tamu.edu/housing/efficient_housing/ water_management/index.php Rio Grande Basin Initiative://fcs.tamu.edu/housing/efficient_housing/ water_management/index.php Rio Grande Basin Initiative http://riogrande.tamu.edu/ Energy Star http

408

Energy Savings Potential of Process Control Valve Replacement  

E-Print Network [OSTI]

candidates for savings. A feasibility study of retrofitting a pipeline flow control system, currently operating with a constant speed pump and differential producing, modulating control valve, with a variable speed drive is presented. This case study...

Holzenthal, L. Jr.

409

Load beam unit replaceable inserts for dry coal extrusion pumps  

DOE Patents [OSTI]

A track assembly for a particulate material extrusion pump according to an exemplary aspect of the present disclosure includes a link assembly with a roller bearing. An insert mounted to a load beam located such that the roller bearing contacts the insert.

Saunders, Timothy; Brady, John D.

2012-11-13T23:59:59.000Z

410

Dallas-Fort Worth, TX Clean Taxi Replacement Incentive  

Broader source: Energy.gov [DOE]

The North Central Texas Council of Governments has partnered with the U.S. Environmental Protection Agency and the City of Dallas to develop the North Texas Green & Go Clean Taxi Partnership as...

411

aortic arch replacement: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

well imaged with MR angiography. The approach is similar to the thoracic aorta, although ECG-gating is not required. We usually perform a combination of axial T1 weighted GRE and...

412

aortic root replacement: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is designed for full remote...

413

arthroplasty replacement finger: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with fingers perpendicular is com- monly observed at low temperatures in type-II superconduct- ors with strong pinning.1, and hence increases the local temperature; (ii) the...

414

Hormone Replacement Therapy and Height Loss: Does Estrogen Prevent Shrinking?  

E-Print Network [OSTI]

Menopause and Osteoporosis . . . . . . . . . . . . . . . . . . . .II Menopause and Osteoporosis Menopause was once medicallyside effects of menopause, osteoporosis. A brief description

Hall, Victoria M

1993-01-01T23:59:59.000Z

415

Cobalt discovery replaces precious metals as industrial catalyst  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristinaCliffPublication Revision

416

Cobalt discovery replaces precious metals as industrial catalyst  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristinaCliffPublication RevisionCobalt

417

Cobalt discovery replaces precious metals as industrial catalyst  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristinaCliffPublication RevisionCobaltCobalt

418

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromisingStories » Removing nuclear waste,

419

Biomass 2011: Replace the Whole Barrel, Supply the Whole Market |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruary 4, 2014Biogas and Fuel Cells2008: Fueling

420

Building America Technology Solutions for New and Existing Homes: Replacing  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruaryResistance Heating with Mini-Split Heat Pumps |

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataCombinedDepartment2015Services »of(BENEFIT) -Archived EACFailures |Systems

422

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment of Energy WhileTankless Electric - v1.0.xlsx MoreDepartment of

423

Quenching and Partitioning Process Development to Replace Hot Stamping of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol.DepartmentFertilizer usedAugust 7,

424

REQUEST FOR LOST/STOLEN BADGE REPLACEMENT | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | DepartmentLoans |Queryl DetaileesCompetition |REQUEST FOR

425

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 |RebeccaRegionalReliabilityRenewable EnergyRenie

426

Washington State Department of Ecology: Replacement Wells Requiring a Water  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS dataIndiana:Coop Inc Place:Existing Water Right |StateRight

427

Replacement of Data from IHS With Those from HPDI  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in NonproducingAdditions to Capacity on CokersA2. For Renewable

428

Effects of an Accelerated Diesel Engine Replacement/Retrofit Program  

E-Print Network [OSTI]

T. A. , (2001). Diesel engines: environmental impact andof a heavy-duty diesel engine to improve deNOx performanceOn-road heavy-duty diesel engine exhaust particulate matter

Millstein, Dev E.; Harley, Robert A

2009-01-01T23:59:59.000Z

429

Categorical Exclusion 4567, MPLE Test Stand Replacement Project  

Broader source: Energy.gov (indexed) [DOE]

material DB3.6 - R&D or pilot facility DB3.7 * New infill exploratory, experimental oilgasgeothermal constructionoperation DB3.8 - Outdoor ecologicalenvironmental research...

430

Construction by Replacement: A new approach to simulation modeling  

E-Print Network [OSTI]

Simulation modeling can be valuable in many areas of management science, but it is often costly, time-consuming, and difficult to do. To reduce these problems, system dynamics researchers have previously developed standard ...

Hines, James

431

Microsoft Word - xx xx 13 Midway pole replacement news release...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

07 13 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Tuesday, Feb. 12, 2013 CONTACT: Mike Hansen, 503-230-4328 or 503-230-5131 BPA to hold public meeting on proposed rebuild...

432

California: SQAMD Replaces Drayage Trucks with CNG | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top FiveDepartment of EnergyLANDSCAPE OF131:770:9AprilofDepartmentAward |SQAMD

433

LED Performance Specification Series: T8 Replacement Lamps  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10 DOEWashington, DCKickoffLDV HVAC ModelLEDLights

434

Jordan Malheur Resource Area Jonesboro Diversion Dam Replacement FONSI 1  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7January 2015Jim StockJonathan Elkind Jordan

435

Replaced by Mods 002, 006, 020, 029, 0049,  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF CIVIL RIGHTS/%2ABuildingReferences | by

436

Replaced M473, M0512, M0538, M0541  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF CIVIL RIGHTS/%2ABuildingReferences

437

LED T8 Replacement Lamps | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andofIanJennifer SomersKnown Challenges AssociatedLANLLEDT8

438

Replace Pressure-Reducing Valves with Backpressure Turbogenerators |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartmentEnergy DataRemediatedLands

439

Replacing an Oversized and Underloaded Electric Motor | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartmentEnergy DataRemediatedLandsEnergy V-Belts withEnergy

440

Magnetic Nanoparticle Capilary Flow as a Replacement for Lateral Flow  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowell L.FallU . SChromatography - Energy

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Sandia National Laboratories: replacing carbon-dioxide-emitting fuels  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1developmentturbineredox-active perovskiteremoving the highlypower generationreplacing

442

Sandia National Laboratories: replacing petroleum as a transportation fuel  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1developmentturbineredox-active perovskiteremoving the highlypower

443

COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6Energy, science, andAnalysis15 CNMSHydraulicLabwith Fungi |

444

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5Post-Holiday HolidayProcessRateofofRenewable EnergyRenewable

445

Replace V-Belts with Notched or Synchronous Belt Drives  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartmentnews-flashesEnergy by Brian Weeks,Preliminary

446

Trim or Replace Impellers on Oversized Pumps | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of EnergyTheDepartment of Energy and Military Leaders

447

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartment ofColumbusReport #StudyRenewable EnergyPreliminary Findings

448

Replacement-3 Wholesale Power Rate Schedule | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartment ofColumbusReport #StudyRenewable EnergyPreliminary Findings3

449

Boron-10 Neutron Detectors for Helium-3 Replacement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply forBiosurveillance A8^BorderHomeland Security

450

Window Replacement, Rehabilitation, & Repair Guides - Building America Top  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of EnergyofProject isNovember 07, 2007What Isand SupplyEnergy Wind

451

New Feedstocks and Replacement Fuel Diesel Engine Challenges | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOETowardExecutiveRateEnergyDepartment ofof Energy

452

New Feedstocks and Replacement Fuels - Future Energy for Mobility |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOETowardExecutiveRateEnergyDepartment ofof

453

Minor-Groove-Modulating Adenosine Replacements Control Protein Binding and  

E-Print Network [OSTI]

RNAs Hayden Peacock , Erik Fostvedt , and Peter A. Beal* Department of Chemistry, University of California, beal@chem.ucdavis.edu. Received for review August 16, 2010 and accepted September 23, 2010. Published

Beal, Peter A.

454

Replace Report 02-771 October 29, 2002  

E-Print Network [OSTI]

. Offshore Wind Farm. Horns Rev Annual Status Report for the Environmental Monitoring Programme 1st January.................................................................................................................3 1.1 Description of the Wind Farm Project at Horns Rev ........................................3 1 .............................................................................................6 1.3 Cables in the Wind Farm and to the Shore

455

Replacement of petroleum based hydraulic fluids with a soybean-based alternative  

SciTech Connect (OSTI)

Despite the best preventative measures, ruptured hoses, spills and leaks occur with use of all hydraulic equipment. Although these releases do not usually produce a RCRA regulated waste, they are often a reportable occurrence. Clean-up and subsequent administrative procedure involves additional costs, labor and work delays. Concerns over these releases, especially related to Sandia National Laboratories (SNL) vehicles hauling waste on public roads prompted Fleet Services (FS) to seek an alternative to the standard petroleum based hydraulic fluid. Since 1996 SNL has participated in a pilot program with the University of Iowa (UNI) and selected vehicle manufacturers, notably John Deere, to field test hydraulic fluid produced from soybean oil in twenty of its vehicles. The vehicles included loaders, graders, sweepers, forklifts and garbage trucks. Research was conducted for several years at UNI to modify and market soybean oils for industrial uses. Soybean oil ranks first in worldwide production of vegetable oils (29%), and represents a tremendous renewable resource. Initial tests with soybean oil showed excellent lubrication and wear protection properties. Lack of oxidative stability and polymerization of the oil were concerns. These concerns were being addressed through genetic alteration, chemical modification and use of various additives, and the improved lubricant is in the field testing stage.

Rose, B.; Rivera, P.

1998-05-01T23:59:59.000Z

456

Gundrilling Oil Evaluation to Find a Replacement for 50-50  

SciTech Connect (OSTI)

In 2006 the gundrilling oil used at Honeywell FM&T (Federal Manufacturing and Technology) was known as 50-50. This name was selected because the oil is a mixture of two machining oils, Milpro 634 and Pennex N47. Unfortunately, Honeywell FM&T was notified that one component, Pennex N47, would be discontinued by the manufacturer. At this point the Honeywell FM&T team decided to select a single oil to eliminate mixing and procurement of two products. In addition, the team also wanted to select new oil with lower viscosity than the 50-50 mixture. Lower (than 50-50) viscosity oil was recommended by Nagel the manufacturer of the new TBT gundrilling machines. To this end Honeywell FM&T evaluated seven cutting oils in order to select a substitute that would achieve acceptable gundrilling results. This work resulted in the selection of Castrol Ilocut 334 based on cutting performance and human factors. The Castrol oil can easily achieve up to 8 holes per drill at a feed rate 30% greater than that achieved by the 50-50 oil. Once design agency approval is received, this oil will be installed as the drilling oil for all FM&T stems. This oil will also be used for other reservoir machining operations where appropriate.

Karl Arnold

2008-04-30T23:59:59.000Z

457

SMART C: A Semantic Macro Replacement Translator for C Matthew Jacobs E Christopher Lewis  

E-Print Network [OSTI]

powerful approach to program transformation is to augment an existing compiler, such as GCC, to build an ad]) are powerful, but they cannot reliably transform source-level constructs because some constructs (e,lewis}@cis.upenn.edu Abstract Programmers often want to transform the source or bi- nary representations of their programs (e

Lewis, E. Christopher

458

Gender Equity and Fertility in European Below-Replacement Fertility Countries: Poland and Estonia  

E-Print Network [OSTI]

Much of the recent scholarly attention has been devoted to the low fertility situation experienced by a growing number of developed countries. In this context, the theoretical framework explicitly incorporating the issues of gender in explanations...

Iwinska-Nowak, Anna Malgorzata

2012-02-14T23:59:59.000Z

459

Optimization of opportunistic replacement activities: A case study in the aircraft industry  

E-Print Network [OSTI]

must there- fore be opportunistic, incorporating preventive maintenance activities within the scheduled to consider that the maintenance event is an opportunity for preventive maintenance#22;an opportunity Svensson # Abstract In the aircraft industry maximizing availability is essential. Maintenance schedules

Patriksson, Michael

460

Repair and Replacement projects help FM to honor its commitment to  

E-Print Network [OSTI]

of the University. Services provided fall into three major categories: preventive maintenance, routine repairs friendly power. Energy Management is continually recognized for the superior maintenance. · Maintenance (www.facm.umn. edu/services/maintenance.html) Maintenance Operations preserves the physical assets

Gulliver, Robert

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

E-Print Network 3.0 - authority refrigerator replacement Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Majid - School of Engineering Science, Simon Fraser University Collection: Engineering ; Energy Storage, Conversion and Utilization 8 COMPARISON OF ENVIRONMENTAL IMPACTS AND...

462

Ways Electricity Can Be Used To Replace Fossil Fuels in The French Chemical Industry  

E-Print Network [OSTI]

France energy policy for the year 1990 foresees the following breakdown between various energy sources : renewable sources (including hydraulic) : 11%, coal + natural gas : 30.5%, nuclear : 26.5%, oil : 32%. The electricity will be produced mainly...

Mongon, A.

1982-01-01T23:59:59.000Z

463

Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring  

SciTech Connect (OSTI)

The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. of Cambridge, Massachusetts, to implement and study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating control systems in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded.

Dentz, J.; Henderson, H.; Varshney, K.

2013-10-01T23:59:59.000Z

464

[Minor revisionposted 3/7/14 (replaces 1/27/12 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

OP 70.35: Drug and Alcohol Testing for Safety- and Security-sensitive Positions DATE: March 7, 2014 safety sensitive). c. Security-sensitive Positions Level II Positions designated as security PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to establish programs designed to help

Rock, Chris

465

An assessment of alternatives and technologies for replacing ozone- depleting substances at DOE facilities  

SciTech Connect (OSTI)

Title VI of the Clean Air Act, as amended, mandates a production phase-out for ozone-depleting substances (ODSs). These requirements will have a significant impact on US Department of Energy (DOE) facilities. Currently, DOE uses ODSs in three major activities: fire suppression (halon), refrigeration and cooling (chlorofluorocarbons [CFCs]), and cleaning that requires solvents (CFCs, methyl chloroform, and carbon tetrachloride). This report provides basic information on methods and strategies to phase out use of ODSs at DOE facilities.

Purcell, C.W.; Miller, K.B.; Friedman, J.R.; Rapoport, R.D.; Conover, D.R.; Hendrickson, P.L. [Pacific Northwest Lab., Richland, WA (United States); Koss, T.C. [USDOE Assistant Secretary for Environment, Safety, and Health, Washington, DC (United States). Office of Environmental Guidance

1992-10-01T23:59:59.000Z

466

A replacement solvent cleaner/degreaser study at Duffy Electric and Machine Company  

SciTech Connect (OSTI)

Duffy Electric & Machine Company repairs and rebuilds electric motors. The company overhauls large electric motors (AC and DC with greater than 15 hp output). The company also overhauls small electric motors. The process involves gross cleaning of electromechanical devices to achieve a level of cleanliness that facilitates inspection, repair, and testing. The cleaner used in this study, Petroferm BIOACT{trademark} 285, was selected because it is representative of its class of material. BIOACT{trademark} is a mixture of high molecular-weight aliphatic esters and can be categorized as a semi-aqueous fluid. The cleaner is meant to be used without dilution and must be rinsed with alcohol, such as IPA, rather than with water. The alcohol is a technical grade that is at least 98% IPA, with the remainder being water. The IPA rinse is completely miscible with the ester solvent. The IPA evaporates rapidly due to its high vapor pressure (3 mm Hg @ 68{degrees}F).This report describes the performance of the ester and alcohol cleansers with regard to pollution abatement and health hazards as well as cleaning performance.

Springer, J. Jr. [Risk Reduction Engineering Lab., Cincinnati, OH (United States); Sass, B. [Battelle, Columbus, OH (United States)

1995-10-01T23:59:59.000Z

467

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System  

SciTech Connect (OSTI)

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the Citys hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the Citys Project Engineer, who had overseen the application, resigned and left the Citys employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

Stephens, Jessica D.

2013-05-29T23:59:59.000Z

468

Functionalized Graphene Sheets as a Versatile Replacement for Platinum in Dye-Sensitized Solar Cells  

E-Print Network [OSTI]

) electrodes were tested for catalytic performance in dye-sensitized solar cells (DSSCs). By using ethyl) this residue must not disperse in the electrolyte. KEYWORDS: graphene, dye-sensitized solar cell, cobalt redox mediator, triiodide, sacrificial binder 1. INTRODUCTION Dye-sensitized solar cells (DSSCs

Aksay, Ilhan A.

469

Percutaneous aortic valve replacement in a re-animated postmortem heart  

E-Print Network [OSTI]

transcatheter implantation of heart valve prosthesis for thein apex of post-mortem heart (lower view). B C A Figure 5A.descending aorta in lambs. Eur Heart J. 2002;23:1045-49. 5.

White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

2006-01-01T23:59:59.000Z

470

Stainless steel replaces platinum to produce hydrogen Friday, March 13, 2009  

E-Print Network [OSTI]

-catalyzed carbon cloth," says Bruce E. Logan, Kappe professor of environmental engineering. The brushes used were cathode needed to be placed very close to the graphite fiber brush anode for optimum effect. At an applied brushes show great promise in that they have high current densities and high energy recovery," says Logan

471

Mobile Phones, Japanese Youth, and the Re-Placement of Social Contact Keio University  

E-Print Network [OSTI]

The mobile phone is often perceived as an emblematic technology of space-time compression, touted as a tool limitations inherent in their weak social status, their usage is highly deferential to institutions of home July-February 2003 by Okabe and Ito. For this study, our intent was to capture the usage patterns

Ito, Mimi

472

[Minor revisionposted 11/20/12 (replaces 10/6/05 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

OP 60.06: Lockout/Tagout Program DATE: November 20, 2012 PURPOSE: The purpose of this Operating of Federal Regulations, 1910.147, "The Control of Hazardous Energy (Lockout/Tagout)," and the Accident Employee - An employee whose job requires her/him to operate or use a machine or equipment under lockout

Rock, Chris

473

Energy and Thermal Aware Buffer Cache Replacement Algorithm Jianhui Yue, Yifeng Zhu, Zhao Cai, Lin Lin  

E-Print Network [OSTI]

simultaneously. We use three real-world I/O server traces, including TPC-C, LM-TBF and MSN-BEFS to evaluate our efficiency becomes a pressing concern, especially for high-density racks and blade servers. Buffer cache

Zhu, Yifeng

474

Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012  

Broader source: Energy.gov (indexed) [DOE]

l 021, Subpart D, Appendix B; (5) involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed...

475

Electrophoretic detection and separation of mutant DNA using replaceable polymer matrices  

DOE Patents [OSTI]

The disclosure relates to a method for resolving double-stranded DNA species differing by at least one base pair. Each of the species is characterized by an iso-melting domain with a unique melting temperature contiguous with a melting domain of higher thermal stability. 18 figs.

Karger, B.L.; Thilly, W.G.; Foret, F.; Khrapko, K.; Koehavong, P.; Cohen, A.S.; Giese, R.W.

1997-05-27T23:59:59.000Z

476

E-Print Network 3.0 - adaptive coherence-replacement protocol...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and look-up. 3 Mobile... . There are several advantages of using a service oriented architecture: loose coupling of services and adaptability... is obtained directly by...

477

Review of the data bases for making decisions regarding Trojan steam generator replacement options  

SciTech Connect (OSTI)

The central focus for this assessment has been to compare the corrosion behavior of two steam generator (SG) tube materials: Inconel 600 TT and Inconel 690 TT from (a) SG operating experience, and (b) laboratory data. The scope and results of the comparisons are summarized in this section. They provide the basis for projecting SG longevity.

Johnson, A.B. Jr.; Gilbert, E.R.

1992-03-01T23:59:59.000Z

478

Microsoft Word - CX-FY10_Ross-VanShip_Wood_Pole_Replacement_WEB...  

Broader source: Energy.gov (indexed) [DOE]

or be sent to the Cold Creek Yard. 3. Contaminated soildebris must be placed on plastic and be covered with plastic, anchored to keep the plastic cover in place. An...

479

LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR  

Broader source: Energy.gov [DOE]

This May 19, 2009 webcast summarized CALiPER's recent benchmark testing of common omnidirectional incandescent lamps (e.g., A-lamps), and provided an update on ENERGY STAR criteria for LED integral...

480

Reduced Energy and Maintenance Costs Using Polyurethane as a Replacement Roof System  

E-Print Network [OSTI]

&M System Facilities Planning Department modified the specifications developed by the Physical Plant for use in new construction. In the retrofit system, the urethane foam was applied to the existing roof system, which added to any pre...

Scott, G. D.

Note: This page contains sample records for the topic "lake-monroe spacer-damper replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Increased Efficiency in SI Engine with Air Replaced by Oxygen in Argon Mixture  

SciTech Connect (OSTI)

Basic engine thermodynamics predicts that spark ignited engine efficiency is a function of both the compression ratio of the engine and the specific heat ratio of the working fluid. In practice the compression ratio of the engine is often limited due to knock. Both higher specific heat ratio and higher compression ratio lead to higher end gas temperatures and increase the likelihood of knock. In actual engine cycles, heat transfer losses increase at higher compression ratios and limit efficiency even when the knock limit is not reached. In this paper we investigate the role of both the compression ratio and the specific heat ratio on engine efficiency by conducting experiments comparing operation of a single-cylinder variable-compression-ratio engine with both hydrogen-air and hydrogen-oxygen-argon mixtures. For low load operation it is found that the hydrogen-oxygen-argon mixtures result in higher indicated thermal efficiencies. Peak efficiency for the hydrogen-oxygen-argon mixtures is found at compression ratio 5.5 whereas for the hydrogen-air mixture with an equivalence ratio of 0.24 the peak efficiency is found at compression ratio 13. We apply a three-zone model to help explain the effects of specific heat ratio and compression ratio on efficiency. Operation with hydrogen-oxygen-argon mixtures at low loads is more efficient because the lower compression ratio results in a substantially larger portion of the gas to reside in the adiabatic core rather than in the boundary layer and in the crevices, leading to less heat transfer and more complete combustion.

Killingsworth, N J; Rapp, V H; Flowers, D L; Aceves, S M; Chen, J; Dibble, R

2010-01-13T23:59:59.000Z

482

Presentation Outline 1. How to tell what needs to be replaced?  

E-Print Network [OSTI]

://www.awwa.org/awwa/waterwiser/dripcalc.cfm 9 1. Read aerator volume 2. Check screen intact 3. Check screen is not clogged Photo: Faucet aerator inside tank dimensions 4. Measure water displaced with flush 10 Photo Source: http://www.toiletflapper.org #12;Checking Flush Valve Type Toilets Flush handle Flush valve with sensor 1. Look for leaks 2. Check

California at Davis, University of

483

Thematic role prediction at the verb and the effects of replacements on subsequent processing  

E-Print Network [OSTI]

This experiment employed the visual world paradigm to determine if participants could use selectional restrictions derived from the sentential verb to predict a target referent, replicating Altmann and Kamide (1999). Eye ...

Devlin, Gemma

2006-01-01T23:59:59.000Z

484

E-Print Network 3.0 - antiprotons replace electrons Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Physics, University of Wales Swansea Collection: Physics ; Plasma Physics and Fusion 6 Production of Cold Antihydrogen during the Positron Cooling of Antiprotons...

485

energy savings by the use of mtbe to replace alkylate in automotive gasolines  

SciTech Connect (OSTI)

This paper presents data on the differences in energy consumption in the production of leaded and unleaded AI-93 gasolines with various blend components. The authors investigate as high-octane components certain products that are more effective in use and less energy-consuming in production in comparison with alkylate. In particular, methyl tert-butyl ether (MTBE) is discussed; it is not poisonous, it has a high heat of combustion, and it does not attack materials of construction. The addition of 11% MTBE to gasoline lowers the cold start temperature of engines by 10-12 degrees. Moreover, no adjustment of the carburetor is required for the changeover to gasoline with 11% MTBE.

Englin, B.A.; Emel'yanov, V.E.; Terent'ev, G.A.; Vinogradov, A.M.

1986-07-01T23:59:59.000Z

486

[Minor revisionposted 5/9/14 (replaces 1/28/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

-owned utilities such as water, gas, sewer, telephone, TV, cable, and electric): Texas Excavation Safety System (Dig TESS) 1-800-344-8377 b. Texas Tech University-owned utilities (water, gas, sewer, electric markings, e.g., chalk (see Attachment A for suggested manufacturer) shall be used to indicate the location

Rock, Chris

487

Unprocessed rice husk ash as a partial replacement of cement for low-cost concrete  

E-Print Network [OSTI]

Cement is a very valuable commodity as it can be used to construct structurally sound buildings and infrastructure. However, in many developing countries cement is expensive due to the unavailability of local resources to ...

Brown, Dorothy Kamilah

2012-01-01T23:59:59.000Z

488

Professional Human Capital Flows: Temporal Structure of Loss, Replacement and Contingent Bundling Effects on Firm Performance  

E-Print Network [OSTI]

to appropriate more value than s/he brings to the new firm (Coff, _______________ This dissertation follows the style of Academy of Management Journal. 2 Pa ge 2 2011; 1999). Despite the evidence that losing and gaining PHC can negatively affect...

Brymer, Rhett

2012-10-19T23:59:59.000Z

489

Stochastic Ratchet Mechanisms for Replacement of Proteins Bound to DNA , J.F. Marko2  

E-Print Network [OSTI]

- binding proteins Fis-Fis and Fis-HU; (3) that a binding specific model describes experiments processes. In [1] a single DNA was stretched out, and spontaneous dissociation of fluorescently-labeled Fis Fis or another DNA-binding protein, e.g., HU) was added, the fluorescent protein unbound rapidly

Cocco, Simona

490

E-Print Network 3.0 - aortic valve replacement Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

<< < 1 2 3 4 5 > >> 1 A Computational Model of Aging and Calcification in the Aortic Heart Valve Summary: A Computational Model of Aging and Calcification in the Aortic Heart...

491

Review, reduce, and replace: The three `R's of energy security Larry Hughes  

E-Print Network [OSTI]

in newly emerging economies, and a decline in the number of oil and natural gas producing nations have all at an affordable price (Costantini, 2005; IEA, 2001a). The World Bank has refined this definition to mean those to be distributed so that all energy demand is met. However, history has shown that the loss of supply, the loss

Hughes, Larry

492

Fact #568: April 27, 2009 For Modern Cars, Replacing an Air Filter...  

Energy Savers [EERE]

February 2009 study conducted by Oak Ridge National Laboratory found that for modern computer-controlled, fuel-injected engines, changing a clogged air filter has no measurable...

493

U.S. Nuclear Power Plants: Continued Life or Replacement After 60? (released in AEO2010)  

Reports and Publications (EIA)

Nuclear power plants generate approximately 20% of U.S. electricity, and the plants in operation today are often seen as attractive assets in the current environment of uncertainty about future fossil fuel prices, high construction costs for new power plants (particularly nuclear plants), and the potential enactment of greenhouse gas regulations. Existing nuclear power plants have low fuel costs and relatively high power output. However, there is uncertainty about how long they will be allowed to continue operating.

2010-01-01T23:59:59.000Z

494

Exchangeable sodium accumulation and replacement in Southeast Texas soils under turfgrass  

E-Print Network [OSTI]

accumulation but exchangeable Na also increased as a function of years of irrigation. The multiple regression equation: SARE =-5.16 + 0.53 SARiw + 4.04 In (yr) (R2 = 0.86) best predicted SARE to a depth of 30 cm. This study also compared gypsum, a common...

Najjar, Namir Fouad

1995-01-01T23:59:59.000Z

495

Mercury Replacement Program It is the policy of California State University, Fullerton to remove mercury containing  

E-Print Network [OSTI]

they are performing research in laboratories, servicing or maintenance on machines and equipment throughout campus. II or interrupt the flow of electricity within an electrical circuit. Thermostats Used in heating, ventilation

de Lijser, Peter

496

[Minor revisionposted 6/12/14 (replaces 4/2/10 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

.S.C. 6801, et. Seq., implemented by 16 C.F.R. Part 314, shall be governed by the TTU Information Security Plan for Financial Information (Attachment C). "Financial information" includes, but is not limited to

Rock, Chris

497

[Minor revisionposted 5/26/13 (replaces 8/9/10 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

on the university campus is under a service contract to an elevator maintenance company for complete maintenance Maintenance staff will report the problem to the elevator company with the service contract on that building

Rock, Chris

498

[Major revisionposted 4/2/13 (replaces 9/1/04 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

construction contracts; (4) 23.6 % for professional services contracts; (5) 24.6 % for all other services contracts; and (6) 21 % for commodities contracts All Texas Tech University and System offices

Rock, Chris

499

[Major revisionposted 12/21/12 (replaces 12/9/04 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

campus departments may be sent to a check collection service contracted by the university and may result

Rock, Chris

500

[Major revisionposted 9/10/13 (replaces 6/13/12 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

that does not involve the traditional relationship of employer and employee. c. A major consulting services contract is a contract for which it is reasonably foreseeable that the value of the contract will be equal

Rock, Chris