Retrofit of an existing 160 MVA 69KV major Chicago downtown substation to 200 MVA 138KV while maintaining continuity of service  

SciTech Connect

In 1957 Transmission Substation 68, LaSalle, (TSS 68) was placed in service. This paper reports that the station consists of four 40 MVA 69 kV/12 kV transformers which feed two 12 kV ring buses. The 12 kV switchgear is housed on the first and second floors of a 62 year old structurally sound building. Located on the south and west sides of this building are the four transformers. The entire station is located on a parcel of land approximately 14,000 square feet.

Czernenko, G.P. (Commonwealth Edison Co., Chicago, IL (United States))

1992-01-01T23:59:59.000Z

2

Development of 77 kV 40 MVA gas-vapor cooled transformer  

SciTech Connect

A 77 KV 40 MVA gas-vapor cooled transformer has been developed as a prototype of substation transformers, which is directed to nonflammable and lightweight properties. To examine the operating reliability of the transformer, the reliability test has continued since July, 1981 at the Hokusetsu substation of KEPCO (Kansai Electric Power Co., Inc.). This report will cover the development work on thermal stability of materials, electrical fault test, insulation characteristics, cooling of model transformer, flow-induced static electrifiction, protection system and the prototype unit which is being built based upon these developments.

Tokoro, K.; Harumoto, Y.; Ina, T.; Kabayama, Y.; Sato, T.; Yamauchi, A.

1982-11-01T23:59:59.000Z

3

MGSC EOR MVA  

NLE Websites -- All DOE Office Websites (Extended Search)

Randy Locke, P.G. MVA Program, Assistant Coordinator Illinois State Geological Survey www.sequestration.org Illinois Basin - MVA Programs at Mumford Hills and Sugar Creek EOR Sites Overview * Monitoring, Verification and Accounting (MVA) Goals * MVA Efforts * Mumford Hills * Sugar Creek * Preliminary Observations at Sugar Creek * Kentucky Geological Survey * Glynn Beck, Kathy Takacs, Marty Parris * Illinois State Geological Survey

4

MGSC EOR MVA  

NLE Websites -- All DOE Office Websites (Extended Search)

by Randy Locke, P.G. MVA Program, Assistant Coordinator Illinois State Geological Survey www.sequestration.org Illinois Basin - MVA Programs at Mumford Hills and Sugar Creek EOR...

5

Pepco's standard 80 MVa substation  

SciTech Connect

As a result of studies made prior to 1960, the Potomac Electric Power Company changes its distribution system from a 4.16 kV primary network to a 13.8 kV radial system, utilizing the 69 kV subtransmission system as the primary supply voltage. The 80 Mva substation design and arrangement were developed as an integral component of this system. Following the philosphy established in the 1930s, the electrical equipment would be completely enclosed within a building. This approach provided a functional as well as attractive substation which could be located in an existing community or in a developing area. The 80 Mva substation building was developed to provide maximum flexibility in appearance and electrical equipment arrangement as well as in engineering, drafting, and construction. Design details and future aspects are discussed.

Thaden, M.V.

1980-05-01T23:59:59.000Z

6

Development and Test of a Prototype 100MVA Superconducting Generator  

SciTech Connect

In 2002, General Electric and the US Department of Energy (DOE) entered into a cooperative agreement for the development of a commercialized 100 MVA generator using high temperature superconductors (HTS) in the field winding. The intent of the program was to: • Identify and develop technologies that would be needed for such a generator. • Develop conceptual designs for generators with ratings of 100 MVA and higher using HTS technology. • Perform proof of concept tests at the 1.5 MW level for GE’s proprietary warm iron rotor HTS generator concept. • Design, build, and test a prototype of a commercially viable 100 MVA generator that could be placed on the power grid. This report summarizes work performed during the program and is provided as one of the final program deliverables.

Fogarty, James M.; Bray, James W.

2007-05-25T23:59:59.000Z

7

Power Quality Evaluation of 480-V, 2-MVA UPS Systems  

DOE Green Energy (OSTI)

A mobile 480-V, 2-MVA UPS System utilizing battery energy storage was installed at S and C Electric Company's Polymer Products Fabrication Building in Chicago, Illinois in May 1999 to provide uninterrupted power to the building for up to 15 seconds in the event of a voltage sag or momentary interruption in the local utility supply. Similar units can be applied at medium voltage through the application of a step-up transformer to provide momentary power disturbance ride through of up to 30 seconds for loads up to 15 MVA at system voltages ranging from 4.16 kV to 34.5 kV. A power quality evaluation of the installation was performed over a six-month period from July 1999 to early January 2000. This paper describes the details and results of this power quality evaluation, which involved two phases. Phase I involved the collection and review of power disturbance data and the effects on process equipment, while Phase II involved power quality monitoring of utility source and building load voltages and currents over a period of six months. Review of power disturbance data and equipment power-disturbance ride-through characteristics during Phase I of the project indicated that the polymer fabrication process in the building is affected by the tripping of motors driving hydraulic pumps for the thermal set molding machines. The tripping of these motors may have resulted in direct production losses in 1998 of approximately $468,000. The monitoring conducted during Phase II of the project showed that the PureWave UPS operated as intended during 12 utility voltage sag events to protect the building's load against momentary power disturbances. In addition, the unit operated successfully during many staged interruptions involving opening of a source-side circuit breaker.

CAMM,E.H.; COREY,GARTH P.; ROBERTS,B.

2000-06-21T23:59:59.000Z

8

Microsoft PowerPoint - Overview of MVA(Hovorka).ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Austin SECARB coal seam Geological Survey of Alabama Virginia Tech SECARB Plant Daniels EPRI Southern Co ARI Other SECARB tests Questions * What are techniques for MVA? -...

9

Microsoft Word - CCS MVA - Intro_2011.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring, Verification, and Accounting Monitoring, Verification, and Accounting An effective monitoring, verification, and accounting (MVA) program is designed to confirm permanent storage of carbon dioxide (CO 2 ) in geologic formations through monitoring capabilities that are reliable and cost effective. Monitoring is an important aspect of CO 2 injection, since it focuses on a number of permanence issues. Monitoring technologies can be developed for surface, near-surface, and subsurface applications to ensure that injection, abandoned, and monitoring wells are structurally sound and that CO 2 will remain within the injection formation. Should Federal or state greenhouse gas accounting regulations and/or CO 2 emissions reductions be required, monitoring can be used to account for the quantity of CO

10

Design and Development of a 100 MVA HTS Generator for Commercial Entry  

SciTech Connect

In 2002, General Electric and the US Department of Energy (DOE) entered into a cooperative agreement for the development of a commercialized 100 MVA generator using high temperature superconductors (HTS) in the field winding. The intent of the program was to: (1) identify and develop technologies that would be needed for such a generator; (2) develop conceptual designs for generators with ratings of 100 MVA and higher using HTS technology; (3) perform proof of concept tests at the 1.5 MW level for GE's proprietary warm iron rotor HTS generator concept; and (4) design, build, and test a prototype of a commercially viable 100 MVA generator that could be placed on the power grid. This report summarizes work performed during the program and is provided as one of the final program deliverables. The design for the HTS generator was based on GE's warm iron rotor concept in which a cold HTS coil is wound around a warm magnetic iron pole. This approach for rotating HTS electrical machinery provides the efficiency benefits of the HTS technology while addressing the two most important considerations for power generators in utility applications: cost and reliability. The warm iron rotor concept uses the least amount of expensive HTS wire compared to competing concepts and builds on the very high reliability of conventional iron core stators and armature windings.

None

2007-06-07T23:59:59.000Z

11

Design and cost estimate of an 800 MVA superconducting power transmission  

Science Conference Proceedings (OSTI)

Numerous studies involving cost estimates have been performed for superconducting power transmission systems. As these systems were usually aimed at providing transmission from large clusters of generation the base power rating of the corridor was very high; in the case of the most comprehensive study it was 10,000 MVA. The purpose of this study is to examine a system which is very closely based on the prototype 1000 MVA system which was operated at Brookhaven National Laboratory over a four year period. The purpose of the study is to provide cost estimates for the superconducting system and to compare these estimates with a design based on the use of advanced but conventional cable designs. The work is supported by funding from the Office of Energy Research's Industry/Laboratory Technology Exchange Program. This program is designed to commercialize energy technologies. The technical design of the superconducting system was prepared by the BNL staff, the design of the 800 MVA conventional cable system was done by engineers from Underground Systems Incorporated. Both institutions worked on the cost estimate of the superconducting system. The description and cost estimate of the conventional cable system is given in the Appendix. 5 refs.

Alex, P.; Ernst, A. (Underground Systems, Inc., Armonk, NY (USA)); Forsyth, E.; Gibbs, R.; Thomas, R.; Muller, T. (Brookhaven National Lab., Upton, NY (USA))

1990-10-18T23:59:59.000Z

12

Design and Development of a 100 MVA HTS Generator for Commercial Entry  

SciTech Connect

In 2002, General Electric and the US Department of Energy (DOE) entered into a cooperative agreement for the development of a commercialized 100 MVA generator using high temperature superconductors (HTS) in the field winding. The intent of the program was to: (1) identify and develop technologies that would be needed for such a generator; (2) develop conceptual designs for generators with ratings of 100 MVA and higher using HTS technology; (3) perform proof of concept tests at the 1.5 MW level for GE's proprietary warm iron rotor HTS generator concept; and (4) design, build, and test a prototype of a commercially viable 100 MVA generator that could be placed on the power grid. This report summarizes work performed during the program and is provided as one of the final program deliverables. The design for the HTS generator was based on GE's warm iron rotor concept in which a cold HTS coil is wound around a warm magnetic iron pole. This approach for rotating HTS electrical machinery provides the efficiency benefits of the HTS technology while addressing the two most important considerations for power generators in utility applications: cost and reliability. The warm iron rotor concept uses the least amount of expensive HTS wire compared to competing concepts and builds on the very high reliability of conventional iron core stators and armature windings.

2007-06-07T23:59:59.000Z

13

Nuclear Maintenance Applications Center: Repair and Reconditioning Specification Guidance for AC Squirrel-Cage and Salient Pole Sync hronous Motors with Voltage Ratings of 2.3 to 13.2 kV: Revision 1 of 1000897  

Science Conference Proceedings (OSTI)

The power industry is experiencing a loss of expertise as the workforce ages and some work is being outsourced to specialty suppliers. Many of the major electric motors in plants were also beginning to experience aging effects. To assist with obtaining proper motor service, EPRI published Report 1000897, Repair and Reconditioning Specification for AC Squirrel-Cage Motors with Voltage Ratings of 2.3 to 13.2 kV in 2000.

2008-12-18T23:59:59.000Z

14

Microsoft PowerPoint - Overview of MVA(Hovorka).ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance of a Geologic Surveillance of a Geologic Sequestration Project: Monitoring Validation Accounting Susan D. Hovorka Gulf Coast Carbon Center Bureau of Economic Geology University of Texas at Austin Management of SECARB Management of SECARB Gulf Coast Carbon Gulf Coast Carbon Center Center Gulf Coast Gulf Coast Carbon Center Carbon Center Sponsors Sponsors University of Texas at Austin SECARB coal seam Geological Survey of Alabama Virginia Tech SECARB Plant Daniels EPRI Southern Co ARI Other SECARB tests Questions * What are techniques for MVA? - techniques purely (or mostly) research oriented - techniques that ensure project integrity * Do we have MVA techniques that can be used today to ensure the integrity of GS projects and detect leaks if they are occurring? * What else do we need to learn about MVA?

15

Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation  

Science Conference Proceedings (OSTI)

The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

Ohler, C.K.

1991-05-21T23:59:59.000Z

16

In-Situ MVA of CO2 Sequestration Using Smart Field Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

In-Situ MVA of CO In-Situ MVA of CO 2 Sequestration Using Smart Field Technology Background Through its core research and development program administered by the National Energy Technology Laboratory (NETL), the U.S. Department of Energy (DOE) emphasizes monitoring, verification, and accounting (MVA), as well as computer simulation and risk assessment, of possible carbon dioxide (CO 2 ) leakage at CO 2 geologic storage sites. MVA efforts focus on the development and deployment of technologies that can provide an accurate accounting of stored CO 2 , with a high level of confidence that the CO 2 will remain stored underground permanently. Effective application of these MVA technologies will ensure the safety of geologic storage projects with respect to both human health and the environment, and can provide the basis for establishing

17

Cable System Technology Review of XLPE EHV Cables: 220 kV to 500 kV  

Science Conference Proceedings (OSTI)

Utilities in North America are now evaluating the first long-length circuits of extruded cross-linked polyethylene (XLPE) cable systems containing many joints at rated voltages 220 kV, 230 kV, and 345 kV. Of interest is whether the design, manufacture, and installation of XLPE extra-high-voltage (EHV) cable systems has been sufficiently demonstrated to satisfy utilities that it can provide reliable service for their particular applications. This report reviews the worldwide state of the art, gives method...

2002-12-16T23:59:59.000Z

18

Proposed Norton-Tesuque 115 kV overhead transmission line and substation in Sante Fe, New Mexico  

SciTech Connect

Construction is proposed of a 115/12.5-kilovolt (kV), 10/12.5-megavolt-ampere (MVA) substation in the Tesuque area and of 9.02 miles of 115-kV overhead transmission line from the Norton Station to the new substation in an area approximately three miles north of Sante Fe, New Mexico. The project would involve the granting of a 100-foot width right-of-way by the Tesuque Pueblo, the construction of the substation on the Tesuque Pueblo Indian Reservation between the Rio Tesuque and New Mexico 85, the addition of a 115-kV breaker bay at Norton Station, and the installation of two underground 12.47-kV distribution feeders to connect to existing ones in the Tesuque area. In addition, the station would be designed to accommodate one future underground 12.47-kV feeder that would terminate at a future distribution line in the Tesuque area. The preferred transmission line route would originate at the Norton Station and proceed east-northeast up Calabasa Arroyo to a point approximately 1.1 miles north of the southwest corner of the Tesuque Pueblo boundary. From this point the route would proceed east to the proposed substation site.

1985-06-01T23:59:59.000Z

19

8MVA modulator/regulator for neutral beams  

SciTech Connect

This paper describes very generally the modulator/regulator (Mod/Reg) being built for Transrex by Systems, Science and Software for use on the neutral beam power supplies that Transrex is building for General Atomic Company to power the neutral beam heating systems that will be used on the Doublet III fusion device. The Mod/Reg is required to provide an 80 kV, 100 A pulse for a second every 90 sec. The voltage is to be regulated to 3%, and in case of fault the pulse must be interrupted within 10 ..mu..sec. An additional requirement was that the total system have very low capacity such that the total energy stored would be less than 15 joules. This is a restriction imposed by the source designer to prevent destroying the source in case of an arc within the source.

Remsen, D.B. Jr.; Overett, T.H.

1980-05-01T23:59:59.000Z

20

230 kV operation of a substation designed for 115 kV by controlling voltage transients  

SciTech Connect

Arresters applied at the terminals of gas insulated substations have been used successfully for protection from switching and lightning surges. This arrester application for gas insulated substations permits the use of lower insulation levels and therefore more economical substations. In principle, the same technique can be applied to air insulated substations. This paper describes the analysis of transient voltages in a substation designed for 115 kV which is scheduled for operation at 230 kV. Both arrester rating and location are considered in this analysis. It is shown that complete substation protection is possible by addition of both arresters and capacitors.

Lannes, W.J.; Cheramie, W.J.; Priest, K.W.; Wilhelm, M.R.

1984-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Risk-Informed Monitoring, Verification and Accounting (RI-MVA). An NRAP White Paper Documenting Methods and a Demonstration Model for Risk-Informed MVA System Design and Operations in Geologic Carbon Sequestration  

Science Conference Proceedings (OSTI)

This white paper accompanies a demonstration model that implements methods for the risk-informed design of monitoring, verification and accounting (RI-MVA) systems in geologic carbon sequestration projects. The intent is that this model will ultimately be integrated with, or interfaced with, the National Risk Assessment Partnership (NRAP) integrated assessment model (IAM). The RI-MVA methods described here apply optimization techniques in the analytical environment of NRAP risk profiles to allow systematic identification and comparison of the risk and cost attributes of MVA design options.

Unwin, Stephen D.; Sadovsky, Artyom; Sullivan, E. C.; Anderson, Richard M.

2011-09-30T23:59:59.000Z

22

STABILIZED HIGH INTENSITY SOURCE OF 80 kv  

SciTech Connect

With the change of the current load from 0 to 2.5 mamp and simultaneous change of incoming intensity from 270 to 190 v, the stabilized high-intensity source changes less than l%.. The stabilized intensity can be arranged in steps of 5 kv from 60 to 80 kv. The high-intensity stabilizer automatically switches on upon reaching 60 kv. (tr-auth)

Polivanov, V.V.; Izyurov, A.V.; Pyatakov, N.I.

1959-09-01T23:59:59.000Z

23

Slide 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

architecture and test * Summary * Future work 4 4 Project Objective: Windfarm Integration Power rating 10 MVA Transmission Line voltage 69 kV STATCOM voltage 4.16 kV Phase current...

24

Alameda 115-kV project  

SciTech Connect

Faced with an increasing demand for electricity, the Bureau of Electricity in Alameda, California decided to investigate alternative means to increase reliability, reduce losses and provide for economic expansion of the power supply system. The investigation indicated the need for 115-kV service to interconnect the Pacific Gas and Electric Company Substation C in Oakland with the Bureau's Atlantic Substation on Alameda Island, a distance of approximately 1.5 miles. Detailed planning and design for the 115-kV project was undertaken. Extensive studies were performed to select the route and determine the design. The studies are described.

1985-01-01T23:59:59.000Z

25

Solid-State Fault Current Limiter Development: Design of a 15.5-kV Field-Ready Unit  

Science Conference Proceedings (OSTI)

The solid-state current limiter (SSCL) is power-electronics-based equipment designed to work with the present utility system. The SSCL monitors the line current and dynamically inserts additional impedance into the line if a fault is detected. The SSCL is based on a modular design and can be configured for 5-kV through 69-kV systems at nominal current ratings of 1000A–4000A.In this report, a complete design is presented for 15.5-kV, 1200A and 4000A, single-phase and three-phase ...

2013-02-14T23:59:59.000Z

26

Development and Deployment of a Compact Eye-safe Scanning Differential Absorption Lidar (DIAL) for Spatial Mapping of Carbon Dioxide for MVA at Geologic Carbon Sequestration Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Deployment of a Deployment of a Compact Eye-safe Scanning Differential Absorption Lidar (DIAL) for Spatial Mapping of Carbon Dioxide for MVA at Geologic Carbon Sequestration Sites Description Through its core research and development program administered by the National Energy Technology Laboratory (NETL), the U.S. Department of Energy (DOE) emphasizes monitoring, verification, and accounting (MVA), as well as computer simulation, of possible carbon dioxide (CO 2 ) leakage at CO 2

27

RATES  

NLE Websites -- All DOE Office Websites (Extended Search)

Marketing > RATES Marketing > RATES RATES Current Rates Past Rates 2006 2007 2008 2009 2010 2011 2012 Rates Schedules Power CV-F13 CPP-2 Transmissions CV-T3 CV-NWT5 PACI-T3 COTP-T3 CV-TPT7 CV-UUP1 Ancillary CV-RFS4 CV-SPR4 CV-SUR4 CV-EID4 CV-GID1 Future and Other Rates SNR Variable Resource Scheduling Charge FY12-FY16 (October 1, 2012) SNR Rates Process Calendar (PDF - 171K) Procedures Informal Process Transmission Action Items List (PDF - 144K) Power Action Item List updated on 4-27-10 (PDF - 155K) Power Action Item List (Quick links to relevant documents) Formal Process Rates Brochure (01/11/2011) (PDF - 900K) Appendix A - Federal Register Notice (01/03/2011) (PDF - 8000K) Appendix B - Central Valley Project Power Repayment Study (PDF - 22,322K) Appendix C - Development of the CVP Cost of Service Study (PDF - 2038K)

28

RATES  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning & Projects Planning & Projects Power Marketing Rates You are here: SN Home page > Power Marketing > RATES Rates and Repayment Services Rates Current Rates Power Revenue Requirement Worksheet (FY 2014) (Oct 2013 - Sep 2014) (PDF - 30K) PRR Notification Letter (Sep 27, 2013) (PDF - 959K) FY 2012 FP% True-Up Calculations(PDF - 387K) Variable Resource Scheduling Charge FY12-FY16 (October 1, 2012) PRR Forecast FY14-FY17 (May 23, 2013) (PDF - 100K) Forecasted Transmission Rates (May 2013) (PDF - 164K) Past Rates 2013 2012 2011 2010 2009 Historical CVP Transmission Rates (April 2013) (PDF - 287K) Rate Schedules Power - CV-F13 - CPP-2 Transmission - CV-T3 - CV-NWT5 - PACI-T3 - COTP-T3 - CV-TPT7 - CV-UUP1 Ancillary - CV-RFS4 - CV-SPR4 - CV-SUR4 - CV-EID4 - CV-GID1 Federal Register Notices - CVP, COTP and PACI

29

O:\\ELECTRIC\\DETROIT\\PP-230-2_ord.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that the phase-shifting transformer would have a 675 MVA rating. 2 (1) a 230,000-volt (230-kV) transmission line connecting the Bunce Creek Station, located in Marysville,...

30

RATES  

NLE Websites -- All DOE Office Websites (Extended Search)

RATES RATES Rates Document Library SNR Rates Process Calendar (PDF - 171K) Procedures Informal Process Transmission Action Items List (PDF - 144K) Power Action Item List updated on 4-27-10 (PDF - 155K) Power Action Item List (Quick links to relevant documents) Formal Process Rates Brochure (01/11/2011) (PDF - 900K) Appendix A - Federal Register Notice (01/03/2011) (PDF - 8000K) Appendix B - Central Valley Project Power Repayment Study (PDF - 22,322K) Appendix C - Development of the CVP Cost of Service Study (PDF - 2038K) Appendix D - Western Transmission System Facilities Map (PDF - 274K) Appendix E - Estimated FY12 FP and BR Customer (PDF - 1144K) Appendix F - Forecasted Replacements and Additions FY11 - FY16 (PDF - 491K) Appendix G - Definitions (PDF - 1758K) Appendix H - Acronyms (PDF - 720K)

31

Operation of a long-term transient monitoring system in a 138-KV and a 500-KV substation  

SciTech Connect

This paper describes the operating performance of automatic transient monitoring laboratories designed to capture fault and transient data on power systems. Laboratories were installed in a 138-kV and a 500-kV substation and operated for more than 25,000 hours over a three-year period. Recorded during this period were 341 events consisting of lightning, switching, and fault transients. These results provide invaluable data on actual transients in power systems to aid power system equipment designers.

Perkins, M.D.; Mauser, S.F.; Mikell, D.C.; Nilsson, S.L.

1984-08-01T23:59:59.000Z

32

1200-kV future seen; automated distribution dangers  

SciTech Connect

A major problem facing the electric-utility industry concerns power-transmission corridors. The corridors serving the nation's power needs may not be available in sufficient numbers to meet growing electricity demand. The difficulty in locating new power corridors will necessitate the transmission of increased power along pathways already available. The possibility of open-transmission systems going to 1200 kV is being researched at Westinghouse Electric Corporation. While much of the technology for 1200-kV transmission is being demonstrated currently (such as transformers, puffer-breakers, lightning arrestors, and reactors), the public fear of low-level radiation and excessive noise may make construction of 1200-kV open substations near the load virtually impossible. The implications of not having sufficient load capability to meet demand concern Westinghouse officials. The possibility of involuntary power rationing could require social and political solutions instead of technical ones. (SAC)

1980-07-01T23:59:59.000Z

33

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

34

EIS-0450: TransWest Express 600 kV Direct Current Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in...

35

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at medium voltages * 13.8 kV and 4.16 kV are commonly used voltages * Silicon Carbide high voltage devices play a pivotal role at these voltages 6 Multilevel vs Two-Level...

36

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to provide notification of any and all 230kV planned and unplanned outages at Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating...

37

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties,...

38

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

39

ETM (Distribution Network Automation on 10 kV cable line stations...  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

40

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

Science Conference Proceedings (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Review and evaluation of the Department of Energy's Research and Development Program for 1200-kV transmission and substation equipment  

SciTech Connect

In 1975 the US Department of Energy (DOE), Division of Electric Energy Systems (EES), initiated a program for the research and development (R and D) of 1200-kV transmission and substation equipment with a goal of developing the technology capable of three-phase power transfer of 10 GW. The program was oriented toward compact, compressed-gas-insulated (CGI) component design. The DOE/EES R and D program has encompassed all the major and essential transmission cable, substation apparatus, and specialized instrumentation for a 1200-kV system. It has included more than ten major multiyear research projects and has involved numerous research, development, manufacturing, and testing organizations. This report provides a review and evaluation of the overall DOE/EES 1200-kV R and D program. It includes detailed descriptions of the major projects, their objectives, component and system design direction, and current research status. Future R and D requirements are noted, and commercialization issues are briefly discussed. Research to date has not presented any insurmountable technical obstacles to 1200-kV CGI component design. Thus, although all of the component pieces are not yet available and all of the testing is not yet complete, 1200-kV CGI-based transmission and substation equipment appears to be technically feasible. Although the substation and transmission components under development in this program will not likely reach 1200-kV system commercialization for a number of years, many of the materials and design concepts that have been identified for 1200-kV service are readily applicable to devices rated at lower voltages.

Gnadt, P.A.; Walldorf, S.P.

1985-06-01T23:59:59.000Z

42

A 50 kV solid state multipulse kicker modulator  

DOE Green Energy (OSTI)

Performance requirements, design concepts, and test results for a prototype multipulse kicker modulator based on solid-state switches and a voltage-adding transformer topology are described. Tape-wound cores are stacked to form the transformer primary windings and a cylindrical pipe that passes through the circular inner diameters of the cores serves as the secondary winding of the step-up transformer. Boards containing MOSFET switches, trigger circuitry, and energy-storage capacitors plug into the core housings. A 50 kV prototype modulator that meets most of the facility requirements has been designed, fabricated, and tested at LLNL. More recent work has been concerned with designing and testing cores and boards with the full volt-second capability needed for 24-pulse operation. Results of the 50 kV prototype tests, preliminary tests of the full-volt-second cores and boards, and future development needs are described.

Walstrom, P. L. (Peter L.); Cook, E. G. (Edward G.)

2003-01-01T23:59:59.000Z

43

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high voltage GaAs photoguns have been built at Jefferson Lab based on a compact inverted insulator design. One photogun provides the polarized electron beam at CEBAF and operates at 130 kV bias voltage. The other gun is used for high average current lifetime studies at a dedicated test facility and has been operated at bias voltage up to 225 kV. The advantages of higher DC voltage for CEBAF include reduced space-charge emittance growth and the potential for prolonged photocathode lifetime. However, a consequence of operating at higher voltages is the increased likelihood of field emission or breakdown, both of which are unacceptable. Highlights of the R&D studies leading toward a production 200keV GaAs photogun for CEBAF will be presented.

J.M. Grames, P.A. Adderley, J. Clark, J. Hansknecht, M. Poelker, M.L. Stutzman, R. Suleiman, K.E.L. Surles-Law

2011-03-01T23:59:59.000Z

44

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison: Final Report  

Science Conference Proceedings (OSTI)

Following up the successful testing of a complete 50 m, 115 kV high temperature superconducting (HTS) power cable system prototype, EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation undertook a project to design, install, and operate a 24 kV HTS power cable at Detroit Edison's Frisbie substation to serve customer load. The demonstration cable circuit ran approximately 120 m between the 24 kV bus distribution bus and a 120 kV-24 kV tr...

2004-12-22T23:59:59.000Z

45

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

46

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

47

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

48

Factors affecting the failure of copper connectors brazed to copper bus bar segments on a 615-MVA hydroelectric generator at Grand Coulee Dam  

DOE Green Energy (OSTI)

On March 21, 1986, the United States Bureau of Reclamation experienced a ground fault in the main parallel ring assembly of Unit G19 - a 615-MVA hydroelectric generator - at Grand Coulee Dam, Washington. Inspection of the unit revealed that the ground fault had been induced by fracture of one or more of the copper connectors used to join adjacent segments of one of the bus bars in the north half of the assembly. Various experimental techniques were used to detect and determine the presence of cracks, crack morphology, corrosion products, and material microstructure and/or embrittlement. The results of these inspections and recommendations are given. 7 refs., 27 figs.

Atteridge, D.G.; Klein, R.F.; Layne, R.; Anderson, W.E.; Correy, T.B.

1988-01-01T23:59:59.000Z

49

765kV Transmission line Voltage gradient  

E-Print Network (OSTI)

Corona ring Transmission lines Nowadays, due to the ever increasing energy consumption and power supply optimization, it is required to construct new power plants, substations and transmission lines. In Iran, also, because of increasing demand for electrical energy, for a significant power loss reduction in power transmission over long distances, and to construct high transmission lines that lead to reduction in the economic costs of transmission lines, the transmission lines must be considered at extra high voltage (EHV) levels. These EHV levels should be compared with the low voltage levels in order to extract the benefits. Therefore, in this paper, a review has been conducted on the types of 765 kV transmission lines used in different countries and a comparison between them and the low voltage levels have been performed. Accordingly, the advantages of EHV transmission lines are summarized. Finally, designing a line of 765 kV single-circuit with 6 conductors per bundle based on existing standards is presented.

unknown authors

2012-01-01T23:59:59.000Z

50

Design of the Atlas 240 kV Marx modules  

DOE Green Energy (OSTI)

A prototype 240 kV, oil-insulated Marx module has been designed and constructed at the Los Alamos National Laboratory (LANL). The prototype will be used for testing and certifying the design of the Marx module and certain components, including the closing switches, series resistor, and the capacitors themselves. The prototype will also be used to evaluate proposed mechanical systems designs. Information gained from the construction and testing of the 4-capacitor prototype will be folded into the design of the 16-capacitor maintenance unit. The prototype module consists of four 60 kV capacitors, two closing switches, one shunt resistor, and one series resistor. Cables are used to deliver the current to a dummy load scaled to match Atlas system parameters. The Marx unit is contained in a structure made from G-10, suspended from a steel frame that also serves to support components of the trigger, charging, and control system. Appropriate safety and charging systems are an integral part of the prototype design.

Bowman, D.W.; Bennett, G.; Biehl, F. [and others

1997-06-01T23:59:59.000Z

51

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

52

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's...

53

Geomagnetically Induced Current Estimation in the Wisconsin 345-kV Power Grid  

Science Conference Proceedings (OSTI)

This technical update presents the results from a project to assess space weather effects on the Wisconsin 345-kV power transmission grid.

2008-08-21T23:59:59.000Z

54

MFTF 230 kV pulsed power substation  

SciTech Connect

The Mirror Fusion Test Facility (MFTF) currently under construction at the Lawrence Livermore Laboratory includes a Sustaining Neutral Beam Power Supply System (SNBPSS) consisting of 24 power-supply sets. The System will operate in long pulses (initially .5 seconds and eventually 30 seconds) at high power (200 MW), which will necessitate a large source of ac power. To meet this requirement, a new 230-kV substation is also being built at LLL. The constraints of cost, equipment protection, short operating lifetime (10 years), and reliability dictated a unique substation design. Its unusual features include provisions for fast fault detection and tripping, a capability for limiting ground fault current, low impedance, and economical design.

Wilson, J.H.

1979-11-12T23:59:59.000Z

55

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high volt­age GaAs pho­to­guns have been built at Jef­fer­son Lab based on a com­pact in­vert­ed in­su­la­tor de­sign. One pho­to­gun pro­vides the po­lar­ized elec­tron beam at CEBAF and op­er­ates at 130 kV bias volt­age. The other gun is used for high av­er­age cur­rent life­time stud­ies at a ded­i­cat­ed test fa­cil­i­ty and has been op­er­at­ed at bias volt­age up to 225 kV. The ad­van­tages of high­er DC volt­age for CEBAF in­clude re­duced space-charge emit­tance growth and the po­ten­tial for pro­longed pho­to­cath­ode life­time. How­ev­er, a con­se­quence of op­er­at­ing at high­er volt­ages is the in­creased like­li­hood of field emis­sion or break­down, both of which are un­ac­cept­able. High­lights of the R&D stud­ies lead­ing to­ward a pro­duc­tion 200keV GaAs pho­to­gun for CEBAF will be pre­sent­ed.

Grames, J M; Clark, J; Hansknecht, J; Poelker, M; Stutzman, M L; Suleiman, R; Surles-Law, K.E.L.; BastaniNejad, M

2011-03-01T23:59:59.000Z

56

Proposed 230-kV Crossover Substation, Big Horn County, Montana: Environmental assessment  

SciTech Connect

Western proposes to construct, operate, and maintain a 230-kV substation northwest of Hardin, Big Horn County, Montana. The proposed Crossover Substation would form an interconnection between Western's Yellowtail-Custer and MPC's Colstrip-Billings 230-kV transmission lines. Impacts and mitigation strategies are discussed.

1984-02-01T23:59:59.000Z

57

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

58

HVDC converter stations for voltages above 600 kV: R and D needs and priorities: Final report  

Science Conference Proceedings (OSTI)

A study of the R and D needed to build converter stations for HVDC transmission lines with pole-to-ground voltages between 800 and 1200 kV confirmed that economical designs for more than 800 kV will require long-term R and D. Converter stations for 800 kV appear possible with existing technology.

Krishnayya, P.C.S.; Maruvada, P.S.; Lambeth, P.J.; Desilets, G.; Trinh, N.G.

1986-12-01T23:59:59.000Z

59

Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment  

Science Conference Proceedings (OSTI)

Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.

Not Available

1993-02-05T23:59:59.000Z

60

Western Area Power Administration, Desert Southwest Region Facilities Ratings Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Ratings Project Facilities Ratings Project Hoover-Mead #1 and #5 230-kV and Mead-Marketplace 500-kV Transmission Lines Continuation Sheet Project Description (Continued) Hoover-Mead # 1 230-kV Transmission Line Along the Hoover-Mead #1 230-kV transmission line, the existing line will be reconductored between structures 0/4 and 4/2, about 3.5 linear miles. Structure 0/4 is located northeast of Mead Substation; structure 4/2 is located southeast of Boulder City Tap. The scope of work for the reconductoring includes the following: * At tangent structures (where there is no change in the angle of the transmission line), pulleys or travelers will be installed where the existing conductor attaches to the insulator. The old conductor will be pulled out through the travelers and new wire will be pulled in. A bucket truck

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Evaluation of 765-kV Polymer Insulators in a Contaminated Environment  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) and the Korea Electric Power Research Institute (KEPRI) are conducting a joint study on the aging performance of 765-kV polymer insulators in a contaminated marine environment. The main component of this research is a long-term (two-year) natural aging test that will be conducted by KEPRI at their 765-kV Gochang test facility in South Korea. EPRI has engaged three other utilities that operate 765-kV transmission systemsEskom in South Africa, American Electric ...

2010-04-30T23:59:59.000Z

62

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

63

Wood substation design beats out steel. [Conversion of 115-kV to 230 kV substations at Carolina Power and Light Co  

SciTech Connect

Construction plans for voltage conversion of substations can lead to new designs that are economical, reduce outage times, and result in minimum impacts on the environment. In fact, these factors prompted Carolina Power and Light Co. to make one such design its construction standard. Cost of converting a 115-kV distribution source substation to 230 kV is 20 percent less than that of replacing it with one of steel design. And because the conversion creates negligible environmental impact, getting government approval for the project is not a major problem. Steel is relegated to special situations.

Thompson, C.M.

1976-09-15T23:59:59.000Z

64

Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack  

Science Conference Proceedings (OSTI)

ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

Dr. Ram Adapa; Mr. Dante Piccone

2012-04-30T23:59:59.000Z

65

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

66

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

67

Plans for 735 kV substation. Towers revealed: Manicouagan-Outardes system  

SciTech Connect

A review of papers presented at the Toronto IEEE meeting is presented. Details of the substation design for the Manicouagan-Outardes 735 kV system are given.

Archambeau, J.; Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-07-15T23:59:59.000Z

68

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

69

Microsoft Word - CX-Alvey 500 kV Fencing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Hamid Habibi Project Manager - TESF-CSB Proposed Action: Replace existing posts and fencing around Alvey Substation 500-kV switch yard. PP&A Project No.: 1 632 Budget Information: Work Order: 00250208 Task: 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.11 Installation of fencing, including that for border marking that will not adversely affect wildlife movements or surface water flow. Location: The proposed project is located in Lane County, Oregon at the Bonneville Power Administration (BPA) Alvey substation around the 500-kV switch yard. Proposed by: BPA Description of the Proposed Action: The project involves replacement of the existing fence and fence posts for the 500-kV yard at the

70

0.4 kV remote control (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

4 kV remote control (Smart Grid Project) 4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

71

220 kV SSSC device for power flow control (Smart Grid Project) | Open  

Open Energy Info (EERE)

kV SSSC device for power flow control (Smart Grid Project) kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location Catalonia, Spain Coordinates 41.59116°, 1.520862° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.59116,"lon":1.520862,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

72

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

73

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison  

SciTech Connect

Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

Kelley, Nathan; Corsaro, Pietro

2004-12-01T23:59:59.000Z

74

Hydro Quebec's 735 kV system in operation by 1965  

SciTech Connect

The 735-kV transmission system adopted for the Manicouagan-Outardes development consists of three 735-kV lines, two of which will cross the St. Lawrence River at Quebec City and follow its south shore to Montreal. The third circuit will be entirely on the north shore of the St. Lawrence. Six 735-kV substations will be required: two collector substations at the sending end, two intermediate substations in the Quebec City area and two receiving substations in the Montreal area. Some of the problems associated with the planning and design of a transmission system intended to deliver approximately 5000 MW over a distance of 360 miles are discussed. The aspects of transmission and substation planning, transmission line features, substation design, control and communications design are considered.

Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-01-01T23:59:59.000Z

75

TVA's 500-kV electric and magnetic fields: measurements and analyses  

Science Conference Proceedings (OSTI)

This report summarizes the results of the 500-kV electric and magnetic fields data project, performed by the Electrical Systems Group of the Tennessee Valley Authority (TVA). The objectives of the project were to measure, record, and analyze electric and magnetic fields in the vicintiy of TVA's 500-kV transmission lines. Also the effects of transmission line fields on the growth and development of selected agricultural and forest plant species were to be investigated. This report contains only the categorization and the statistical analysis of the fields data.

Not Available

1983-09-01T23:59:59.000Z

76

Insulation and radio influence dictate design of 650 kV substation  

SciTech Connect

The 650 kV North Substation of Project EHV is marked by three unusual features which differentiate it from the more familiar 230 and 345 kV substations. First, the sheer size of the apparatus, structures, and busses is striking. Second, is the amount of insulation. As represented by insulators and bushings it is proportionally much larger in lower voltage substations. Third, is the absence of sharp protrusions or angles anywhere in the substation, even on the roof of the house where corona loss is measured. Shielding is evident everywhere in the circles or ovals of smooth aluminum tubing.

Abetti, P.A.

1961-03-27T23:59:59.000Z

77

Present and future applications for 34. 5-kV vacuum switchgear  

SciTech Connect

Vacuum technology applied to circuit breakers for 34.5-kV metal-clad switchgear offers significant advantages over equipment of previous design. Substation size, a major consideration to the 34.5-kV distribution system designer, is further reduced when vacuum equipment is specified. Vacuum equipment versatility is evidenced by the growing number of substation circuit configurations being implemented. Improved interruption capabilities, longer life and reduced maintenance are features offered by vacuum. These many features assure vacuum equipment a prominent position in future substation designs in this voltage class.

Sullivan, P.

1975-01-01T23:59:59.000Z

78

Defective insulators in live working on a 550kV compact steel lattice tower  

Science Conference Proceedings (OSTI)

Research was conducted to determine the minimum number of healthy insulator units needed to ensure worker safety in live working on a compact 550 kV steel lattice tower. A large variety of worksite conditions was investigated. Test results confirm the conservative nature of the CIGRE formula for defective insulator units, and modifications to the formula are suggested. The recommended number of healthy units is 12 in a string of 24 units for the case of live work on the compact 550 kV tower, when the Portable Protective Gap (PPG) is used. Adjustment for altitude should be made above 900 m (3,000 ft).

Gela, G. [EPRI Power Delivery Center, Lenox, MA (United States); Kientz, H. [Western Area Power Administration, Golden, CO (United States); Fox, H.J. Jr. [Public Service Electric and Gas, Bridgewater, NJ (United States); Mitchell, J.D. [Alabama Power Co., Birmingham, AL (United States); Lyons, P.F. [EPRI, Haslet, TX (United States)

1997-04-01T23:59:59.000Z

79

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

80

The 4 times 6 network; Upgrade of a major 500kV substation  

SciTech Connect

This paper describes a study to enhance the reliability of BC Hydro's Ingledow 500 kV substation. It employs truth tables and frequency and duration analysis. The study included double-breaker double-bus and 4 {times} 6 arrangements, and 4 {times} 6 was recommended for its cost and reliability advantages.

Page, R.; Nishikawara, K.; Stromotich, F. (Substation Planning Associates, Inc., West Vancouver (CA))

1991-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Special design and testing aspects of the 345 kV East Fishkill substation  

SciTech Connect

The installation of two 135 MVAR capacitor banks in the 345 kV East Fishkill substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. This paper describes the design of the substation and the tests performed before commissioning the capacitor banks.

Fogarty, R.P.; Halleran, T.M.; Laskowski, L.M.; Mark, D.A. (Consolidated Edison Co. of New York, Inc., New York, NY (United States))

1992-10-01T23:59:59.000Z

82

BLID sensor evaluation at a 500-kV substation: an interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of a buried-line intrusion detection (BLID) sensor is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensor are described.

1979-05-01T23:59:59.000Z

83

Perimeter sensor evaluation at a 500-kV substation. Interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of exterior perimeter intrusion sensors is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensors are described.

Griffith, R.D.

1978-08-01T23:59:59.000Z

84

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

85

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

86

Design and Overview of 100 kV Bushing for the DNB Injector of ITER  

Science Conference Proceedings (OSTI)

The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

2011-09-26T23:59:59.000Z

87

15KV Class 25KVA Single-Phase IUT Prototype Development, Testing, and Performance Verification  

Science Conference Proceedings (OSTI)

EPRI is leading the development and demonstration of fully integrated, production-grade 4-kV and 15-kV-class solid-state transformers for integrating energy storage technologies and electric vehicle (EV) fast charging. The development team includes utilities, power electronics experts, and a transformer manufacturer to provide guidance on taking the technologies from concept to production. The intelligent universal transformer (IUT) technology has been validated through development and lab testing, ...

2013-12-12T23:59:59.000Z

88

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable line stations) Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

89

KvH Projekt GmbH Co KG | Open Energy Information  

Open Energy Info (EERE)

KvH Projekt GmbH Co KG KvH Projekt GmbH Co KG Jump to: navigation, search Name KvH Projekt GmbH & Co KG Place Hamburg, Germany Zip D-20259 Sector Biomass, Solar, Wind energy Product Project developer in wind, solar, biomass and smart architecture. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

90

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

91

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

92

Analysis of a 1200 kV circuit breaker for a gas insulated substation. Final report  

Science Conference Proceedings (OSTI)

This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.

Not Available

1985-01-01T23:59:59.000Z

93

Scale model simulates full-size substation electric fields. [For 345-kV system  

SciTech Connect

An innovative scale model of a 345-kV substation that can be energized to produce representative electric fields has been developed. The purpose of the model is to determine how changes in substation design and operation affect ground-level voltage gradients. Recent tests of the field strengths predicted by the model and actual voltage gradients at the full-size substation at 150 different pairs of points showed excellent agreement. For 94 percent of the pairs the model error was less than 10 percent. The statistical mean of the absolute values of the discrepancies for all 150 points was only 4.6 percent.

1977-04-01T23:59:59.000Z

94

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

1991-06-01T23:59:59.000Z

95

EPRI Transmission Line Reference Book (Blue Book): 115-345 kV Compact Line Design  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the Blue Book, which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines. Note that this electronic report is being pu...

2007-12-13T23:59:59.000Z

96

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Draft environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (ac) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. These adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

97

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Final environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (AC) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. The adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

98

Single-transformer substation for 500 kV and over  

SciTech Connect

At extra high voltage substations which must meet high reliability requirements, in particular, two autotransformer groups are often installed almost simultaneously independent of the load. As a result, significant capital investment is frozen for long periods, and scarce electrical equipment is utilized inefficiently. Thus, in a number of cases the construction of substations with a single group of single-phase autotransformers is desirable. In this case, on failure of one autotransformer phase the time of subnormal energy output due to disconnection of the substation may reach several hours. The efficiency of extra high voltage substations may be improved significantly by using a proposed circuit for connection of a group of single-phase transformers with a single reserve phase, permitting installation of one group of single-phase transformers at a substation without impairment of reliability. The installation, performance and cost of this transformer arrangement are discussed. It is concluded that the use of single-transformer 500 kV substations with the proposed circuit as distribution substations would, on the one hand, provide sufficient reliability for users and, on the other hand, would make them competitive with 220 to 330 kV substations. In this case the network reliability can be provided by sectionalizing the lines at the site of transformer connection. This circuit can be used with two-sided substation supply. (LCL)

Gryuntal, Yu.L.; Mikhailov, A.K.; Slavin, G.A.

1978-06-01T23:59:59.000Z

99

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

100

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Proposal to negotiate, without competitive tendering, a contract for the maintenance of three 420 kV circuit breakers  

E-Print Network (OSTI)

This document concerns the award of a contract for the maintenance, by the manufacturer, of three 420 kV circuit breakers. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, with SCHNEIDER ITALY (IT) (formerly NUOVA MAGRINI GALILEO), the manufacturer of the equipment, for the maintenance of three 420 kV circuit breakers for a total amount of 490 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT?100%.

2000-01-01T23:59:59.000Z

102

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

103

A frequency domain model for 3 kV dc traction dc-side resonance identification  

SciTech Connect

Frequency-dependent effects in railway traction power systems arise from the impedance of substation and locomotive line filters and the traction line. Harmonic noise from traction drives and substations can excite resonances and produce overcurrent or overvoltage conditions at critical points in the network. In this paper, the harmonic feeding impedances of a 3 kV DC traction system seen from the rectifier substation, locomotive drive converter and pantograph terminals are presented. Several substation and locomotive filters are considered with a frequency-dependent traction line. Resonances attributed to the substation filter, locomotive filter and traction line are separate and distinct, the line introducing poles and zeros in the audio frequency (AF) range which vary in frequency and magnitude with locomotive position.

Hill, R.J. [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering; Fracchia, M.; Pozzobon, P.; Sciutto, G. [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica

1995-08-01T23:59:59.000Z

104

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

105

Lightning overvoltage protection of the paddock 362-145 kV Gas-Insulated Substation  

SciTech Connect

Backflashovers close to the Paddiock 362-145 kV Gas-Insulated Substation (GIS) have been analyzed with the Electro-Magnetic Transient Program (EMTP) using a frequency dependent multi-conductor system. The severity of the lightning stroke currents were derived based on recent recordings in the eastern United States. Impacts of corona attenuation and distortion were accounted for using a shunt linear model approach. Turn-up effects of both line insulator flashover voltages and surge arrester protective characteristics were represented based on manufacturer's volt-time curves. Wave shaping effects of substation capacitances (ie., PT's transformers, CCPD's) were also modeled. Results show the importance of various modeling details in determining the overvoltages inside the GIS due to close backflashovers, which are caused by lightning strokes with varying intensity. These results are aimed at better evaluation of lightning protection requirements for GIS protected by metal-oxide surge arresters.

Elahi, H.; Sublich, M. (GE Industry and Utility Sales, Schenectady, NY (US)); Anderson, M.E.; Nelson, B.D. (Wisconsin Power and Light Co., Madison, WI (USA))

1990-01-01T23:59:59.000Z

106

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

Science Conference Proceedings (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

107

Comparison of prediction and measurement of negative sequence currents of generators connected to 345-kV asymmetrical transmission lines  

Science Conference Proceedings (OSTI)

This paper is used to evaluate the negative sequence currents (NSC) of two generators in a generation plant, which are connected to the power pool through four over-head asymmetrical 345-kV transmission lines. The simulation results by using PSS/E and ... Keywords: EMTP, PSS/E, asymmetrical transmission lines, negative sequence current, unbalance

Chi-Jui Wu; Ping-Heng Ho

2011-03-01T23:59:59.000Z

108

Study on Tubular Busbar Corona Design Optimization of ±660kV HVDC Converter Substation in Qingdao  

Science Conference Proceedings (OSTI)

The HVDC busbar corona characteristic is the main factor taken into account for choosing busbar of HVDC converter substation. By establishing the calculation models of electric field strength along the busbar surface, ground total electric field strength ... Keywords: ±660 kV HVDC, converter substation, corona characteristics, electromagnetic, tubular busbar optimization

Xu Mingming; Li Kejun; Tan Zhenyu; Niu Lin

2010-06-01T23:59:59.000Z

109

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

110

Environmental assessment: Coolidge-Saguaro 115-kV rehabilitation, Pinal County, Arizona  

Science Conference Proceedings (OSTI)

This Environmental Assessment (EA) presents an analysis of the environmental impacts of the proposed rehabilitation of 29.6 miles of the Coolidge-Saguaro 115-kV transmission line. The project area is in Pinal County, Arizona. The proposal involves reconductoring the line with larger conductor, replacement of deteriorated structures, and replacement of damaged insulators. The proposed action is being considered in order to increase the safety and reliability of this line. The alternative of no action is also addressed in this EA. The proposed action would have insignificant impacts on wildlife, vegetation or other natural resources. There would be no impacts on floodplains or wetlands. The major impact would be on agricultural crops but much of this can be minimized by the timing of construction. There are no conflicts with county or local planning projects. No cultural resources will be affected by the proposed action. The no action alternative would not correct the potential safety hazard or reliability problems of the existing line.

Not Available

1982-09-01T23:59:59.000Z

111

Performance characteristics of the Atlas 60 kV, 60 kJ plastic capacitors  

DOE Green Energy (OSTI)

This paper provides the performance data of Atlas plastic capacitors as supplied by Maxwell Technologies and Aerovox Corporation. The fiberglass cases at 13 inches high by 29 inches wide and 28 inches in depth with a 2 inch by 18 inch bushing on each end. Two styles of the 33.5uF capacitors have been evaluated for Atlas use, a conventional paper-foil and a self-healing metalized-paper and plastic dielectric design. A test program to capacitor failure, is being used to evaluate capacitor lifetime at full voltage (60 kV) and a nominal 15% reversal. With the Atlas parameters, peak currents of {approximately} 340 kA are realized. In anticipation of faults, capacitors are capable, specified, and tested for 700 kA performance. Accurate methods are also utilized to determine capacitor inductance, less than 20 nH. The results of the various capacitor testing programs will be presented in addition to future directives for their R and D efforts.

Reass, W.; Bennet, G.; Bowman, D.; Lopez, E.; Monroe, M.; Parsons, W.

1997-12-01T23:59:59.000Z

112

Rate Schedules  

Energy.gov (U.S. Department of Energy (DOE))

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

113

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

114

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

115

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

116

EIS-0399: Final EIS for the Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line Comments/Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line VOLUME 2 COMMENT RESPONSE DOCUMENT September 2008 United States Department of Energy State of Montana Department of Environmental Quality COVER SHEET Responsible Agencies: U.S. Department of Energy (DOE) and Montana Department of Environmental Quality (DEQ) are co-lead agencies; the Bureau of Land Management (BLM), U.S. Department of the Interior, is a cooperating agency. Title: Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399) Location: Cascade, Teton, Chouteau, Pondera, Toole, and Glacier counties, Montana. Contacts: For further information about this Final EIS, contact: Ellen Russell, Project Manager,

117

Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines  

Science Conference Proceedings (OSTI)

In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI?s rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

Phillips, A.

2013-01-31T23:59:59.000Z

118

Best Practices for HPFF Pipe Type Cable Assessment, Maintenance and Testing: Blenheim-Gilboa 345-kV Cable Systems  

Science Conference Proceedings (OSTI)

EPRI and the New York Power Authority (NYPA) have sponsored an extensive series of tests on the NYPA Blenheim-Gilboa 345-kV high-pressure fluid-filled (HPFF) transmission cable systems to determine their condition. Several tests were also designed to determine cable power transfer capability based on distributed temperature measurements and to improve the best maintenance practices for the Blenheim-Gilboa HPFF cable systems.

2005-03-01T23:59:59.000Z

119

Investigation of Geomagnetically Induced Currents in the Proposed Winnipeg-Duluth-Twin Cities 500-kV Transmission Line  

Science Conference Proceedings (OSTI)

The effects of geomagnetically induced currents (GIC) on a new 749-km, 500-kV ac transmission line were investigated. GIC effects on the operation of the line, equipment connected directly to the line, and power systems connected to the line were considered. The study concluded that GIC can have a substantial impact on equipment performance and on the power system. Potentially troublesome equipment and system conditions (both steady-state and transient) were identified.

1981-07-01T23:59:59.000Z

120

Field Demonstration of a 24-KV Warm Dielectric Cable at Detroit Edison: FY2001 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the U.S. Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high-temperature superconducting (HTS) power cable in a Detroit Edison substation to serve customer load. The scope of this demonstration will result in the world's first underground installation of an HTS cable system using an existing duct network. Furthermore, the project involves installing the necess...

2002-02-12T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EPRI Transmission Line Reference Book: 115-345 kV Compact Line Design, The Blue Book  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines.

2008-11-05T23:59:59.000Z

122

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

123

Roseville Direct Service 230 kV Transmission Line Project, Sacramento and Placer Counties, California: Environmental assessment  

SciTech Connect

At present, the only transmission line serving the City of Roseville is operated by Pacific Gas and Electric Company (PG and E), which serves the City's Berry Street substation with a 60-kV circuit from the company's own Atlantic Street substation. Western pays wheeling charges to PG and E for use of their lines to deliver power to its customers which cannot be served directly. PG and E has informed Roseville that additional system facilities are required to meet the City's firm transmission requirements in excess of 69 megawatt peak. They proposed to build a new 230-kV line and transformer bank at a cost of $10.9 million which the City would have to pay, in addition to the wheeling charges Western would be charged to use the PG and E line. The City's preferred alternative is to have Western construct a direct 239-kV service from its Elverta substation to the Berry Street substation. This would save the city money in construction capital cost, result in more transmission capacity and eliminate the present wheeling costs charged to Western. Mitigation recommendations are included.

1986-06-01T23:59:59.000Z

124

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

125

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

126

High-Pressure Fluid-Filled Cable Condition Assessment Through Electrical Impulse Testing of PSE&G 230-kV Service-Aged Cable  

Science Conference Proceedings (OSTI)

This report describes electrical and mechanical testing of a service-aged 230-kV high-pressure fluid-filled (HPFF) cable sample that was removed from a Public Service Electric & Gas (PSE&G) underground transmission line.

2008-11-26T23:59:59.000Z

127

STUDY OF ACCELERATED AGING OF 15 kV XLPE AND EPR CABLE INSULATION BY SWITCHING IMPULSES AND ELEVATED AC VOLTAGE.  

E-Print Network (OSTI)

?? Accelerated aging of 15 kV Cross-linked Polyethylene (XLPE) and Ethylene Propylene Rubber (EPR) power cables was carried out in the experiments set for the… (more)

Cao, Linfeng

2010-01-01T23:59:59.000Z

128

Rates - WAPA-137 Rate Order  

NLE Websites -- All DOE Office Websites (Extended Search)

WAPA-137 Rate Order WAPA-137 Rate Order 2009 CRSP Management Center Customer Rates Second Step Presentation from the June 25, 2009, Customer Meeting Handout Materials from the June 25, 2009, Customer Meeting Customer Comment Letters ATEA CREDA Farmington ITCA AMPUA Rate Adjustment Information The second step of WAPA-137 SLCA/IP Firm Power, CRSP Transmission and Ancillary Services rate adjustment. FERC Approval of Rate Order No. WAPA-137 Notice Of Filing for Rate Order No. WAPA-137 Published Final FRN for Rate Order No. WAPA-137 Letter to Customers regarding the published Notice of Extension of Public Process for Rate Order No. WAPA-137 Published Extension of Public Process for Rate Order No. WAPA-137 FRN Follow-up Public Information and Comment Forum Flier WAPA-137 Customer Meetings and Rate Adjustment Schedule

129

Energy Rating  

E-Print Network (OSTI)

Consistent, accurate, and uniform ratings based on a single statewide rating scale Reasonable estimates of potential utility bill savings and reliable recommendations on cost-effective measures to improve energy efficiency Training and certification procedures for home raters and quality assurance procedures to promote accurate ratings and to protect consumers Labeling procedures that will meet the needs of home buyers, homeowners, renters, the real estate industry, and mortgage lenders with an interest in home energy ratings

Cabec Conference; Rashid Mir P. E

2009-01-01T23:59:59.000Z

130

Insertion Rates  

Science Conference Proceedings (OSTI)

HOME > Insertion Rates. TECH HEADLINES. Research Explores a New Layer in Additive Manufacturin... Grand Opening Slated for Electron Microscopy Facility.

131

Rate schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

132

Characteristics of Gafchromic XRQA2 films for kV image dose measurement  

SciTech Connect

Purpose: In this study, the relevant characteristics of the new Gafchromic XRQA2 film for its application in measuring kV cone beam computed tomography (CBCT) image doses were thoroughly investigated. Methods: The film was calibrated free in air to air kerma levels between 0 and 9 cGy using 120 kVp photon beams produced by the x-ray volume imager. Films were scanned using transmission and reflection scanning modes with the Epson Expression 10000 XL flat-bed document scanner. The impact of film size, region of interest for the analysis, scan uniformity, scan resolution, scan orientation and alternate scanning sides on the analysis process were investigated. Energy dependence, postirradiation growth of reflectance with time and irradiation angular dependence of the film were tested at different air kerma levels. Results: The net reflectance changed by {approx}3% when the size of the film piece changed from 1 cm x 2 cm to 10 cm x 11 cm and changed by {approx}1% when ROI changed from 0. 7 cm x 0. 7 cm to 8 cm x 8 cm, suggesting a good uniformity of the film. The film was successfully analyzed using the transmission scanning mode, calibration curves from both transmission and reflection scanning modes showed similar behavior. The calibration uncertainty was somewhat lower when the film was scanned using reflection mode (6% and 8% for reflection and transmission modes, respectively.) Higher scanning resolution came with increasing calibration uncertainty. The calibration uncertainty for reflection and transmission modes increased from {approx}3.5% to 7% and from {approx}3.5% to 9%, respectively when scanning resolution was changed from 50 to 400 dpi. Scanning the film on alternate sides using transmission mode led to variation of 16%-19% in the net optical density at doses commonly used for CBCT procedures. The film response changed by almost 10% when it was exposed to beams of two different energies (100 and 120 kVp.) Other features of the film such as film orientation, postexposure growth, and irradiation angular dependence were also investigated. Conclusions: The size of film piece and analysis ROI used for calibration slightly affected the film response. Both transmission and reflection scanning modes can be used to analyze the Gafchromic XRQA2, with the reflection mode having a somewhat lower calibration uncertainty. Scanning films on alternate sides using transmission mode significantly affects the optical density. The film response was shown to be energy dependent. The films reached stability in about 6 h after exposure. The film response was proven to be independent of irradiation angle except when the beam is parallel to the film surface.

Giaddui, Tawfik; Cui Yunfeng; Galvin, James; Chen Wenzhou; Yu Yan; Xiao Ying [Department Of Radiation Oncology, Thomas Jefferson University, Philadelphia, Pennsylvania 19107 (United States)

2012-02-15T23:59:59.000Z

133

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

134

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

Science Conference Proceedings (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

Gusev, S. I. [JSC 'FSK EES' (Russian Federation); Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I. [Scientific-Research Institute of Electric Power Engineering (VNIIE) - Branch of the JSC 'NTTs Elektroenergetiki', (Russian Federation)

2009-09-15T23:59:59.000Z

135

Field Demonstration of a 24-kV Warm Dielectric Superconducting Cable at Detroit Edison: FY2003 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV HTS power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The FY2002 status report focused on leak detection. The cornerstone of...

2004-03-30T23:59:59.000Z

136

Strategy for Updating EPRI's Transmission Line Reference Book: 115-138-kV Compact Line Design ("The Blue Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a new, updated edition of the Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was originally published in 1978. The new edition will provide the most up-to-date technical information and practices on the design and maintenance of compact overhead lines. It will enable energy companies to construct cost-effective compact lines that produce optimal performances and to address the ability to maintain compact lines w...

2006-10-30T23:59:59.000Z

137

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

138

Lightning protection requirements of SF/sub 6/ substation determined by hybrid simulator. [115/345 kv station  

SciTech Connect

The development of a hybrid computer simulation which can provide the type and quantity of data necessary for determining the behavior of lightning-caused surges traveling through substations is discussed. Results from a specific application on a 115-kV/345-kV station are presented. The results show that the simulation of SF/sub 6/ substations during lightning-caused surges is ideally accomplished by hybrid computer. The quantity of data for complete substation analysis may be gathered efficiently. In addition, digital graphical summaries provide quick insight into substation behavior. The application of this method to simple configurations has shown the previous assumptions must be carefully reviewed. For example, it is shown by computer simulation and analytical hand calculation that the surges with the steepest wave fronts may not produce the highest substation voltages. It is concluded that this hybrid simulation is an excellent tool in the determination of SF/sub 6/ substation response to lightning-caused surges. (LCL)

Tranen, J.D. (New England Electric System, Westborough, MA); Hedin, R.A.; Minnick, J.J.; Priest, K.W.

1977-01-01T23:59:59.000Z

139

Development of 1200-kV compressed-gas-insulated transmission and substation equipment in the United States  

SciTech Connect

Major research and development (R and D) programs for the development of sulfur hexafluoride (SF/sub 6/) compressed-gas-insulated (CGI) equipment for ultrahighvoltage (uhv) application at 100-1200 kV have been under way independently in both the United States and Japan. The CGI transmission and substation equipment under study and development in these countries has included the surge arrester, circuit breaker, CGI transmission bus, disconnect and ground switches, and an air-SF/sub 6/ termination. The US CGI program has also included development of a power transformer, shunt reactor, voltage- and current-sensing instrumentation, and a line trap, all for 1200-kV application. This paper presents the overall status of development of CGI substation equipment for uhv application in the United States. It describes the major CGI components developed, highlights their key design aspects, indicates the present status of development and testing, and addresses the work remaining to establish final design consepts. The paper also includes 23 references, a number of which have not been widely distributed or included in any of the recently published bibliographies of uhv substation equipment.

Walldorf, S.P.; Gnadt, P.A.

1986-01-01T23:59:59.000Z

140

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

DOE Green Energy (OSTI)

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

142

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

143

Microsoft Word - MVA - Table.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects and Congressional Districts Projects and Congressional Districts Title Performer Congressional District A Sea Floor Gravity Survey of the Sleipner Field to Monitor CO 2 Migration SCRIPPS (Scripps Institute of Oceanography) CA53 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations: Linking the Chemical and Physical Effects to Elastic and Transport Properties Stanford University CA14 Basic Science of Retention Issues, Risk Assessment & Measurement, Monitoring, & Verification for Geologic CO 2 Sequestration Montana State University MT01 Brookhaven National Laboratory - New Approach for Long-Term Monitoring of CO 2 Leaks from Geologic Sequestratation Brookhaven National Laboratory NY01 Combining Space Geodesy, Seismology, and Geochemistry for Monitoring,

144

Microsoft Word - CCS MVA - Intro_2011.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

can be developed for surface, near-surface, and subsurface applications to ensure that injection, abandoned, and monitoring wells are structurally sound and that CO 2 will...

145

Microsoft Word - MVA - Table.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven National Laboratory NY01 Combining Space Geodesy, Seismology, and Geochemistry for Monitoring, Verification and Accounting of CO 2 in Sequestration Sites...

146

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

147

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Tariff Rates FY 2014 Rates and Rate Schedules FY 2013 Rates and Rate Schedules FY 2012 Rates and Rate Schedules FY 2011 Rates and Rate Schedules FY 2010 Rates and Rate Schedules FY...

148

150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION  

E-Print Network (OSTI)

depending on the operating volt- age desired. A singlehas a rating of 2000 x 10 farads at 450 volts DC working. Weon each capacitor to 400 volts with clamping zener diodes. A

Owren, H.

2011-01-01T23:59:59.000Z

149

Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks  

SciTech Connect

An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S. [Electric Power Research Institute (VNIIE) (Russian Federation)

2006-11-15T23:59:59.000Z

150

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

151

Review for the State of the Art and Application of Polymer Materials / Insulation used in Distribution Class (12 - 46 kV class) Substations  

Science Conference Proceedings (OSTI)

This report covers the results of a state-of-art study into distribution class (12-46 kV) polymer-based products, the technology used to manufacture them, utility experiences, field potential inspection and diagnostic technique, and utility interest for future research and development to be conducted by EPRI.

2003-11-24T23:59:59.000Z

152

Longitudinal Load and Cascading Failure Risk Assessment (CASE): Central Louisiana Electric Cooperative's 500-kV Toledo-Coushatta Transmission Line  

Science Conference Proceedings (OSTI)

EPRI's Cascading Failure Risk Assessment (CASE) methodology was used to determine extreme event, unbalanced loads on Central Louisiana Electric Company's (CLECO) 500-kV, single circuit, Toledo-Coushatta transmission line. The methodology also identified the line's cascading potential under different loading conditions.

1998-03-11T23:59:59.000Z

153

CX-010683: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination "Glen Canyon Substation Stage 09- 50MVA 23069KV Transformer addition CX(s) Applied: B4.11 Date: 07022013 Location(s): Arizona, Arizona...

154

Publications Portal  

Science Conference Proceedings (OSTI)

... HPE program is developing 100 A, 10 kV SiC power modules to demonstrate the viability of a 2.75 MVA Solid State Power Substation that uses 10 ...

2012-09-17T23:59:59.000Z

155

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Customer Letter - Preliminary Review of Drought Adder Component for 2011 Firm Power Rates 2010 Rates and Rate Schedule - Current * 2009 Rates and Rate Schedule 2008 Rates and...

156

Application Guide for Determining Maximum Switching Transient Overvoltages of Overhead Lines Rated 100 kV and Above Using the Electr omagnetic Transients Program (EMTP)  

Science Conference Proceedings (OSTI)

In recent years, through attrition and in other ways, utilities have lost many of the engineers that once performed time-domain (transient) simulations of their power systems. As a result, using the electromagnetic transients program (EMTP) to perform time-domain simulations of the power system has become a lost art; and, as a consequence, such tasks as being able to easily determine the maximum transient overvoltage for a particular transmission line have become arduous for some utilities. At the same t...

2011-11-30T23:59:59.000Z

157

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Loveland Area Project Firm Power Rates Transmission and Ancillary Services Rates 2012 Rate Adjustment-Transmission and Ancillary Services 2010 Rate Adjustment-Firm Power 2009...

158

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates and Repayment Services Consolidated Rate Schedules FY 2014 Rates BCP Annual Rate Process Central Arizona Project Transmission Rate Process DSW Multiple System Transmission...

159

Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.  

SciTech Connect

Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

Lee, Jack M.

1992-06-01T23:59:59.000Z

160

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

162

Evaluation of Suspected Steady-State Magnetic Induction by a 345-kV Double-Circuit Transmission Line onto Railroad Track  

Science Conference Proceedings (OSTI)

CenterPoint Energy operates a double circuit 345-kV transmission line north of Houston that parallels the Burlington Northern Santa Fe Railroad (BNSF) for approximately 15 miles. The railroad is experiencing elevated steady-state 60-Hz voltage in the parallel exposure. AC voltages and currents in railroad track can come from many sources. And, railroad systems can withstand reasonable amounts of this electromagnetic interference (EMI) without problems. When problems with EMI on a railroad do appear, it i...

2008-11-12T23:59:59.000Z

163

Rates & Repayment  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Rates and Repayment Services Rates Current and Historical Rate Information Collbran Power Rates CRSP Power Rates CRSP Transmission System Rates CRSP Management Center interest rates Falcon-Amistad Power Rates Provo River Power Rates Rio Grande Power Rates Seedskadee Power Rates SLCA/IP Power Rates Rate Schedules & Supplemental Rate Information Current Rates for Firm Power, Firm & Non-firm Transmission Service, & Ancillary Services Current Transmission & Ancillary Services Rates Tariffs Components of the SLCA/IP Existing Firm Power Rate Cost Recovery Charge (CRC) Page MOA Concerning the Upper Colorado River Basin

164

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

165

Bipolar HVDC Transmission System Study Between (+ or -) 600 kV and (+ or -) 1200 kV--Corona Studies, Phase II  

Science Conference Proceedings (OSTI)

This report documents a study of the corona performance characteristics of a 6 x 4.06 cm conductor bundle tested under all possible weather conditions and at voltages ranging from plus/minus 750 to plus/minus 1050 kV. Radio interference, audible noise, and corona loss performance were evaluated, and the influence of line voltage on these parameters was studied. Data were collected on the lateral profiles of radio interference, audible noise, ion current density, and electric field at ground level. Electr...

1982-12-01T23:59:59.000Z

166

Failure Analysis of a 345 kV High-Pressure, Fluid-Filled Cable Insulated with Laminated Paper Polypropylene at New York Power Author ity  

Science Conference Proceedings (OSTI)

Three cable pieces of a 345-kV high-pressure, fluid-filled, laminated paper151polypropylene (LPP) cable, each nearly 3 ft in length, were received from New York Power Authority in January 2010. The Detroit Edison Company performed the dissection and analysis to address the cause(s) of the failure that occurred in late December 2009 and that was experienced by this 10.1 circuit-mile cable that had been energized in service in May 1991. One of the pieces contained the failure, and the other two were adjace...

2011-02-28T23:59:59.000Z

167

Eight percent cost penalty for world's first 765-kV SF/sub 6/ substation may be bargain  

SciTech Connect

A Lynchburg, Virginia 765 kV sulfur hexafluoride substation cost a premium of 8% over conventional substations in order to meet environmental requirements, but the first 18 months of operation required no maintenance costs and a design flexibility that meant less land and no landscaping was required. Some of the added front-end cost should be assigned to research and development for this prototype installation. A review of the siting and design specifications cites a number of environmental as well as economic advantages of low-profile, gas-insulated substations. 7 figures, 1 table. (DCK)

Laskowski, L.M.

1981-08-01T23:59:59.000Z

168

Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage  

SciTech Connect

The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

2011-08-25T23:59:59.000Z

169

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waukesha Electric's activities Waukesha Electric's activities Energy Delivery Technologies Div 2010 David Szucs approx. July 2010 - January 2015 Waukeshaa, WI "Recovery Act - Fault Current Limiting Superconducting Transformer" Design and fabricate a prototype superconducting fault current limiting transformer (rated 28 MVA, 66kV/12kV service),whose operation will be demonstrated in a Southern California Edison switchyard. 07 02 2010 David Szucs Digitally signed by David Szucs DN: cn=David Szucs, o=NETL, ou=EDTD, email=szucs@netl.doe.gov, c=US Date: 2010.07.02 12:46:32 -04'00' 07 13 2010 Fred E. Pozzuto Digitally signed by Fred E. Pozzuto DN: cn=Fred E. Pozzuto, o=USDOE, ou=NETL-Office of Project Facilitation and Compliance, email=fred.pozzuto@netl.doe.gov, c=US Reason: I am approving this document

170

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44 44 Waukesha Electric System, Inc OE Southern Cal Edison activities Energy Delivery Technologies Div 2010 David Szucs approx. July 2010- January 2015 Irvine, CA "Recovery Act-Fault Current Limiting (FCL) Superconducting Transformer" Southern California Edison will install & operate a prototype FCL superconducting transformer rated 28 MVA, 66kV/12kV service, built by Waukesha Electric, in their MacArthur substation as a demonstration. 07 02 2010 David Szucs Digitally signed by David Szucs DN: cn=David Szucs, o=NETL, ou=EDTD, email=szucs@netl.doe.gov, c=US Date: 2010.07.02 13:16:07 -04'00' 07 16 2010 Fred E. Pozzuto Digitally signed by Fred E. Pozzuto DN: cn=Fred E. Pozzuto, o=USDOE, ou=NETL-Office of Project Facilitation and Compliance, email=fred.pozzuto@netl.doe.gov, c=US

171

Electric Power Annual 2011  

Gasoline and Diesel Fuel Update (EIA)

Capacity Capacity Conductor Characteristics Data Year Country NERC Region NERC Sub- region Type Operating (kV) Design (kV) Rating (MVa) Month Year From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrange- ment Present Ultimate Company Code Company Name Organizational Type Ownership (Percent) Project Name Level of Certainty Primary Driver 1 Primary Driver 2 2011 US TRE ERCOT AC 300-399 5 2018 DeCordova Benbrook 27 OH 44372 Delivery 100 00TPIT0004 Conceptual Reliability 2011 US TRE ERCOT AC 300-399 5 2018 Loma Alta Substation Rio Hondo Substation 35 OH 2409 BPUB 100 00TPITno07 Conceptual Reliability 2011 US TRE ERCOT AC 121-150 6 2014 Highway 32 Wimberley 4 OH 14626 PEC 100 05TPIT0065 Planned Reliability 2011 US TRE ERCOT AC 121-150 5 2018 Ennis Switch Ennis 6.32 OH 44372 Oncor Electric Delivery 100

172

Data Center Rating Infrastructure Rating Development  

NLE Websites -- All DOE Office Websites (Extended Search)

in Portfolio Manager on June 7, 2010. The questions below are designed to help data center owners and operators better understand the rating and benchmark their buildings in...

173

Tracking the Libor Rate  

E-Print Network (OSTI)

Investigating the Libor Rate,” mimeo. Abrantes-Metz, R. ,Libor data: Historial 1 month Libor rates, British Bankers1108R) Tracking the Libor Rate Rosa M. Abrantes-Metz , Sofia

Abrantes-Metz, Rosa; Villas-Boas, Sofia B.; Judge, George G.

2013-01-01T23:59:59.000Z

174

2012 Rate Adjustments  

NLE Websites -- All DOE Office Websites (Extended Search)

Register Notices Meetings Brochure Brochure Addendum Customer Comment Letter Approved Rate Order FERC Confirmation If you have questions, call Rates and Repayment, 800-472-2306...

175

Rail Coal Transportation Rates  

U.S. Energy Information Administration (EIA)

figure data Figure 7 shows the percent change in average real rates for those state-to-state ... Estimated transportation rates for coal delivered to electric ...

176

Effective Rate Period  

NLE Websites -- All DOE Office Websites (Extended Search)

10012012 - 09302013 Mid-Year Changes (if applicable) 10012012 - 09302013 Power Rates Annual Revenue Requirement Rate Schedule Power Revenue Requirement 73,381,487...

177

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Click to edit Master title style 15 kV Phase Leg Power Modules with SiC MIDSJT Devices Ranbir Singh and Siddarth Sundaresan GeneSiC Semiconductor Inc. ranbir.singh@genesicsemi.com +1 703 996 8200 43670 Trade Center Pl #155; Dulles VA 20166 September 27, 2012 Acknowledgement: The authors thank Dr. Imre Gyuk for funding this work and Dr. Stan Atcitty for technical supervision Sandia National Laboratories is a multi- program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DOE SBIR HV DC Link Grant #SC0008240 2 Phase Leg forms fundamental building block for AC/DC AND DC/AC Conversion

178

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

179

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

180

rates | OpenEI  

Open Energy Info (EERE)

rates rates Dataset Summary Description This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011. Source NREL and Ventyx Date Released February 24th, 2012 (2 years ago) Date Updated Unknown Keywords electric rates rates US utilities Data text/csv icon IOU rates by zipcode (csv, 1.7 MiB) text/csv icon Non-IOU rates by zipcode (csv, 2.1 MiB)

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

182

Historical Interest Rates  

NLE Websites -- All DOE Office Websites (Extended Search)

Current and Historical Interest Rates Current and Historical Interest Rates The table lists interest rates, from the project's inception through the present, for all projects with repayment supervised by the CRSP MC. The latest available interest rate is used for all future interest rate calculations. The Amistad-Falcon, Collbran, Provo River, and Rio Grande Projects are all assigned the average daily "Yield Rate" calculated by the U.S. Treasury, on an annual basis, for Treasury bonds having terms of 15 years or more remaining to maturity. The calculated yield rate is rounded to the nearest one-eighth of one percent. The yield rate is based upon the bond's interest rate, as well as its market value. The Colorado River Storage Project and its participating projects, Dolores and Seedskadee, are assigned the average daily "Coupon Rate," annualized for the same U.S. Treasury bonds used in "Yield Rate" calculations. The coupon rate is the interest rate that the bond carries upon its face.

183

Tracking the Libor Rate  

E-Print Network (OSTI)

Paper 1108R2 Paper 1108R) Tracking the Libor Rate Rosa M.revision 2013 by author(s). Tracking the Libor Rate Rosa M.providing a methodology for tracking the dynamic integrity

Abrantes-Metz, Rosa; Villas-Boas, Sofia B.; Judge, George G.

2013-01-01T23:59:59.000Z

184

2009 Rate Adjustments  

NLE Websites -- All DOE Office Websites (Extended Search)

provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms and approves them on a final basis or until they are replaced by other rates....

185

Mouse heart rate  

NLE Websites -- All DOE Office Websites (Extended Search)

Mouse heart rate Name: amj Status: NA Age: NA Location: NA Country: NA Date: Around 1993 Question: Is it possible to get the heart rate of a mouse without special equipment?...

186

Dynamics of heart rate  

Science Conference Proceedings (OSTI)

Heart rate oscillates on several different time scales and has long?term variability in the form of 1/fnoise. The physiological control of heart rate is briefly reviewed

Daniel T. Kaplan; Mario Talajic

1991-01-01T23:59:59.000Z

187

About the Ratings  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 Ratings Changes 2008 Ratings Changes EPA's "New" Fuel Economy Ratings Video about EPA's New Fuel Economy Ratings Windows Media Video (6.8 MB) Quicktime Video (7.8 MB) Text Version EPA changed the way it estimates fuel economy starting with the 2008 model year. This "new" way of estimating fuel economy supplements the previous method by incorporating the effects of Faster speeds and acceleration Air conditioner use Colder outside temperatures What else do I need to know about the "new" ratings? The tests lower MPG estimates for most vehicles. View old/new MPG ratings for a specific vehicle The actual mileage you get will still vary based on your driving habits, traffic conditions, and other factors. All MPG estimates in Find-a-Car have been converted to the new

188

Effective Rate Period  

NLE Websites -- All DOE Office Websites (Extended Search)

Fiscal Year 2014 Fiscal Year 2014 Effective Rate Period As of Beginning of the FY 10/01/2013 - 09/30/2014 Mid-Year Changes (if applicable) 10/01/2013 - 09/30/2014 Power Rates Annual Revenue Requirement Rate Schedule Power Revenue Requirement $73,441,557 CV-F13 Base Resource Revenue Requirement $69,585,875 First Preference Revenue Requirement $3,855,682

189

High Redshift Supernova Rates  

E-Print Network (OSTI)

We use a sample of 42 supernovae detected with the Advanced Camera for Surveys on-board the Hubble Space Telescope as part of the Great Observatories Origins Deep Survey to measure the rate of core collapse supernovae to z~0.7 and type Ia supernovae to z~1.6. This significantly increases the redshift range where supernova rates have been estimated from observations. The rate of core collapse supernovae can be used as an independent probe of the cosmic star formation rate. Based on the observations of 17 core collapse supernovae, we measure an increase in the core collapse supernova rate by a factor of 1.6 in the range 0.3rate. The increase in the rate in this redshift range in consistent with recent measurements of the star formation rate derived from UV-luminosity densities and IR datasets. Based on 25 type Ia supernovae, we find a SN Ia rate that is a factor 3-5 higher at z~1 compared to earlier estimates at lower redshifts (zrate traces a higher star formation rate at redshifts z>1 compared to low redshift. At higher redshift (z>1), we find a suggested decrease in the type Ia rate with redshift. This evolution of the Ia rate with redshift is consistent with a type Ia progenitor model where there is a substantial delay between the formation of the progenitor star and the explosion of the supernova. Assuming that the type Ia progenitor stars have initial main sequence masses 3-8 M_Sun, we find that 5-7% of the available progenitors explode as type Ia supernovae.

Tomas Dahlen; Louis-Gregory Strolger; Adam G. Riess; Bahram Mobasher; Ranga-Ram Chary; Christopher J. Conselice; Henry C. Ferguson; Andrew S. Fruchter; Mauro Giavalisco; Mario Livio; Piero Madau; Nino Panagia; John L. Tonry

2004-06-24T23:59:59.000Z

190

Rate Schedule CPP-2  

NLE Websites -- All DOE Office Websites (Extended Search)

or rate schedule accepted or approved by the Federal Energy Regulatory Commission (FERC) or other regulatory bodies will be passed on to each relevant customer. The FERC's or...

191

Coaxial 30 kV Connectors for the RG220/U Cable 20 Years of Operational Experience  

E-Print Network (OSTI)

For the fast pulsed magnet system of CERN's SPS and LEP particle accelerators, a special type of moulded coaxial high voltage cable connector is used in large quantities. These connectors are mounted on coaxial transmission lines, which connect pulse generators in buildings at ground level to the fast pulsed magnets situated in an underground tunnel. Well over 1500 such connectors have already been installed and many more will be needed for the construction of the LHC. This 14 TeV Large Hadron Collider, which has a circumference of 27 km, is now under construction at CERN. The paper summarizes the operational experience over the last 20 years and the design principles of the connector. It explains how the excellent reliability and the extremely low failure rate were achieved and outlines the causes of the rare replacements. The paper also discusses the ageing effects caused by radiation, as well as wear and tear during installation and manipulation. Finally it gives a report on our experience with coaxial con...

Mayer, M

2000-01-01T23:59:59.000Z

192

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Pebble Springs-Marion 500-KV Line Study Area 75-B.  

SciTech Connect

Proposed is construction of an approximately 160 mile long, 500-kV, double-circuit transmission line from the proposed Pebble Springs Substation located southeast of Arlington, Oregon, to the existing Marion Substation, 11 miles west of Maupin, Oregon. Development is also proposed of a major switching complex, Pebble Springs Substation, near Arlington, Oregon. Depending on the final route chosen, from 45 to 71 miles of parallel, 9 to 42 miles of new, and 74 miles of existing right-of-way will be required. New access road requirements will range from 45 to 90 miles. Land use affected by the proposed facilities includes 800 to 855 acres of forestland removed from timber production. In addition, 50 miles of cropland, primarily wheat, and approximately 35 miles of grassland will be crossed. Disturbance to wildlife during construction will occur and habitat associated with the above land uses will be eliminated. Soil erosion and siltation, primarily during and immediately after construction will also occur. Visual impacts will occur near several highways, lakes, rivers, and recreation areas. Disturbances to nearby residents will occur during construction. An additional 45 acres of rangeland will be required for the proposed Pebble Springs Substation.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

193

Exchange Rates and Fundamentals  

E-Print Network (OSTI)

We show analytically that in a rational expectations present-value model, an asset price manifests near–random walk behavior if fundamentals are I(1) and the factor for discounting future fundamentals is near one. We argue that this result helps explain the well-known puzzle that fundamental variables such as relative money supplies, outputs, inflation, and interest rates provide little help in predicting changes in floating exchange rates. As well, we show that the data do exhibit a related link suggested by standard models—that the exchange rate helps predict these fundamentals. The implication is that exchange rates and fundamentals are linked in a way that is broadly consistent with asset-pricing models of the exchange rate. I.

Charles Engel; Kenneth D. West

2005-01-01T23:59:59.000Z

194

Field Demonstration of a 24-kV Warm Dielectric Cable at Detroit Edison: FY2002 Annual Progress Report for the Detroit Edison HTS Cab le Field Demonstration Project  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high temperature superconductor (HTS) power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The successful implementation of thi...

2003-02-26T23:59:59.000Z

195

Ashland Area Support Substation Project : Environmental Assessment.  

SciTech Connect

The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power & Light Company`s (PP&L) 115-kilovolt (kV) transmission lines and through PP&L`s Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP&L to allow transfer of three megawatts (MW`s) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP&L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

United States. Bonneville Power Administration.

1992-06-01T23:59:59.000Z

196

Ashland Area Support Substation Project  

Science Conference Proceedings (OSTI)

The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power Light Company's (PP L) 115-kilovolt (kV) transmission lines and through PP L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

Not Available

1992-06-01T23:59:59.000Z

197

OpenEI - rates  

Open Energy Info (EERE)

U.S. Electric Utility U.S. Electric Utility Companies and Rates: Look-up by Zipcode (Feb 2011) http://en.openei.org/datasets/node/899 This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011.

198

<RatesMiscInfo>  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates MISCELLANEOUS INFORMATION Power Supply Report June 2013 (53kb pdf) May 2013 (53kb pdf) April 2013 (52kb pdf) March 2013 (54kb pdf) February 2013 (54kb pdf) January 2013 (54kb...

199

Heat Rate Program Guidelines  

Science Conference Proceedings (OSTI)

Power plant facilities with performance or heat rate improvement programs perform better than those that do not have those programs. A heat rate improvement program typically provides sufficient information for decision making with respect to timely maintenance actions and/or operational adjustments. Monitoring the performance of any power plant component includes the trending of parameters that also describe the performance of other plant components, providing insight and information on improving ...

2012-12-31T23:59:59.000Z

200

Cat Heart Rate Monitoring  

NLE Websites -- All DOE Office Websites (Extended Search)

Cat Heart Rate Monitoring Cat Heart Rate Monitoring Name: Shakti Status: student Grade: 9-12 Location: TX Country: USA Date: Summer 2010 Question: What is the best way to find a cat's heart rate using a stethoscope? Because I have tried to hear their heart beat but their purring is all I can hear. If I shouldn't use a stethoscope, then what should I use? Replies: Hi Shakti! If you want to use a stethoscope, the trick is to get your cat to stop purring. Two good ways that I have found to help stop the purring 1. Cover their nose (generally cats don't like this and will stop purring) or 2. Put on the tap to drip or lightly stream water (also, they generally don't like this and will stop purring). Alternatively, you can get their heart rate from feeling their pulse. A good place to try to feel a pulse is right where the leg attaches to the abdomen - in an area called the inguinal region. Now granted there are some heart conditions that will cause an animals pulse and their heart rates don't match up, and it's hard to feel if you have a fat cat, but it's a good place to try if you are really trying to get a heart rate in a healthy kitty!

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Mythology of rate design  

SciTech Connect

If power rates are determined by marginal costs with clear signals to the consumer, then the load curve will regulate itself without burdening the public with ethical and patriotic issues. Manipulation of the load factor will only cause hardship and inconvenience, but a choice of rates will allow consumers to determine their own balance between rates and convenience. It makes sense to charge consumers the true cost rather than having the same rate apply during a 24-hour period when costs are not uniform. Discussions of how to determine equitable rate structures flounder because we cannot define equity. Economists, who base their recommendations on the assumption that income distribution is reasonable, believe marginal-cost pricing allows the customer to save whatever the utility is saving. Such a system is economically efficient in that the utility charges 100 percent-load-factor consumers according to a base load plant, while charging peak and offpeak consumers what it costs to add them to the system. Adjustment of prices to cause a minimal distortion of the market is the economists' general rule for handling the balancing of cost increases and regulated profits. (DCK)

Streiter, S.H.

1977-01-01T23:59:59.000Z

202

Trade, Interdependence and Exchange Rates  

E-Print Network (OSTI)

period is 1971-2000. All inflation rates and predictions areof Goods and Real Exchange Rate Fluc- tuations,” mimeo [5]Between Trade and Exchange Rate Volatility,” mimeo [6

Fitzgerald, Doireann

2004-01-01T23:59:59.000Z

203

Exchange Rates, Information, and Crises  

E-Print Network (OSTI)

3 Intervention and Exchange Rate Misalignment 4 Conclusion 5explain the exchange rate determination puzzle? Americanrisk to defend the exchange rate. Universit¨at Trier Working

Fernholz, Ricardo Turrin

2011-01-01T23:59:59.000Z

204

BCP Annual Rate Process  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 BCP Annual Rate Process 2013 BCP Annual Rate Process Informal Process Rate Activity Schedule (doc) Informal Customer Meeting Thursday March 6, 2013 at 10:30 A.M. Conf Rms 3&4 Informal Customer Meeting Presentation (Pdf) PRS Executive Summary (Mar 07, 2013) (Pdf) FY2014 Final Ten Year Operating Plan PRS Executive Summary (PDF) FORM for Foreign Visits (doc) Formal Process Initial Federal Register Notice (pdf) Public Information Forum March 27,2013 at 10:30 A.M. Conf Rms3&4 Customer Meeting Presentation PIF Presentation (PPT) Presentation Details (pdf) Reclamation Fund Status Report PIF PRS Executive Summary (pdf) PIF Transcripts (PDF) Visitor Center Cost Analysis Questions - Responses Public Comment Forum April 10, 2013 at 10:30 A.M. Conf Rms3&4 PCF Transcripts Customer Letters

205

Multiple System Rate Process  

NLE Websites -- All DOE Office Websites (Extended Search)

DSW Multiple System Transmission Rate Process DSW Multiple System Transmission Rate Process Federal Register Notice Withdrawing Rate Proposal (PDF) Formal Process Extension Federal Register Notice (PDF) Customer Savings Under Various MSTR (XLS) Public Information Forum March 29, 2005 Customer Meeting Overview (Power Point) Customer Meeting Overview (PDF) Customer Meeting Transcript (PDF) Public Comment Forum April 6, 2005 Customer Meeting Transcript (PDF) Response Letter 5-17-05 (PDF) Customer Letters Tonopah ID-5/25/05 (PDF) APS-5/26/05 (PDF) SRP-5/27/05 (PDF) RSLynch-6/1/05 (PDF) KRSaline-6/1/05 (PDF) Formal Process Federal Register Notice (Word) Federal Register Notice (PDF) Brochure (Word) Appendices to Brochure: A B C D E1 E2 F1 F2 GH Public Information Forum July 14, 2004 Customer Meeting Overview (Power Point)

206

Tests show ability of vacuum circuit breaker to interrupt fast transient recovery voltage rates of rise of transformer secondary faults  

Science Conference Proceedings (OSTI)

A vacuum circuit breaker demonstrated its ability to interrupt short circuits with faster than normal rates of rise of transient recovery voltage (TRV) at levels greater than those produced by most transformer secondary faults. Two recent exploratory test programs evaluated the interrupting ability of a 15kV vacuum circuit breaker containing interrupters of the rotating arc type with contacts made from a chromium-copper powder metal mixture. The interrupting conditions covered a wide range of currents from 10% to 130% of the 28kA rated short circuit current of the tested circuit breaker and a wide range of TRV rates of rise, including the relatively slow rate of rise, normally used in testing and found in most indoor circuit breaker applications, two faster rates of rise equaling and exceeding those found in a known power plant transformer secondary protection application, and the fastest rates of rise possible in the laboratory which exceed the requirements of most transformer secondary faults. These tests showed that the interrupting performance of the tested vacuum circuit breaker was unaffected by the TRV rate of rise to the fastest rates available in the test lab. Such a vacuum circuit breaker can therefore be used without TRV modifying capacitors to slow down the rate of rise provided by the power system. This ability is particularly important if analysis shows that the expected TRV from a transformer secondary fault has a fast rate of rise beyond the recognized ability of an older circuit breaker to acceptably interrupt.

Smith, R.K. [Westinghouse Science and Technology Center, Pittsburgh, PA (United States)

1995-01-01T23:59:59.000Z

207

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

208

Upper Great Plains Rates information  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates and Repayment Services Rates and Repayment Services Rates 2010 Firm Power Rate (effective January 1, 2010) Rate Adjustments 2010 Firm Power Rate Adjustment 2009 Firm Power Rate Adjustment IS Rate Adjustments Rate Adjustment Process Rate Orders Signed, December 23, 2009 (16kb pdf) Announcements Firm Electric Service Customer Letter - Preliminary Review of Drought Adder Component, June 27, 2013 (74kb pdf) Customer Letter - Final Notice of Drought Adder Component, October 2, 2013 (68kb pdf) Integrated System (IS) Rates 2014 IS Rates Customer Information Meeting Presentation, October 15, 2013 (611kb pdf) Customer Letter - Notification of 2014 Rates, September 13, 2013 (160kb pdf) 2014 Transmission and Ancillary Services Rate Calculation and 2012 Rate True-up Calculation (4.9mb pdf) 2013 IS Rates

209

Natural Gas Conveyance and Rates  

Reports and Publications (EIA)

Natural gas transportation market; Competition vs. market power; Rate structures Cost-of-service Performance based rates

Information Center

2001-02-01T23:59:59.000Z

210

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% 4,100 4,400 4,700 5,000 5,300 5,600 5,900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Distillate Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: 2.5% Aug '12 to Aug '13: -1.3% YTD '12 to YTD '13: 1.5% 300 400 500 600 700 800 900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Residual Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: -0.8%

211

Rail Coal Transportation Rates  

U.S. Energy Information Administration (EIA) Indexed Site

reports reports Coal Transportation Rates to the Electric Power Sector With Data through 2010 | Release Date: November 16, 2012 | Next Release Date: December 2013 | Correction Previous editions Year: 2011 2004 Go Figure 1. Deliveries from major coal basins to electric power plants by rail, 2010 Background In this latest release of Coal Transportation Rates to the Electric Power Sector, the U.S. Energy Information Administration (EIA) significantly expands upon prior versions of this report with the incorporation of new EIA survey data. Figure 1. Percent of total U.S. rail shipments represented in data figure data Previously, EIA relied solely on data from the U.S. Surface Transportation Board (STB), specifically their confidential Carload Waybill Sample. While valuable, due to the statistical nature of the Waybill data,

212

Plant Tumor Growth Rates  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Tumor Growth Rates Plant Tumor Growth Rates Name: Gina and Maria Location: N/A Country: N/A Date: N/A Question: We are doing a science fair project on if B. Carotene, Green tea, and Grape Seed Extract helps plants against the crown gall disease. We injected sunflowers with agrobacterium tum. one week ago (Sun. Feb. 27, 2000). Our questions is how long will it take for the tumors to grow? We scratched the surface of the stems and injected the agrobacterium in the wound. Also which do you think, in your opinion, will do the best, if any? Our science fair is April 13, do you think we'll have growth before then, atleast enough time to do our conclusion and results? Thank you, any information you forward will be very helpful. Replies: Sunflowers form galls relatively quickly. I usually get them in two weeks at least. Good luck.

213

Adjusted Growth Rates* Jan.  

U.S. Energy Information Administration (EIA) Indexed Site

Adjusted Adjusted Growth Rates* Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% U.S. Distillate Fuel Sales 3,000 3,500 4,000 4,500 5,000 5,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -7.4% Jan '99 to Jan '00: -0.1% YTD '99 to YTD '00: -0.1% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -16.8% Jan '99 to Jan '00: -3.2% YTD '99 to YTD '00: -3.2% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -9.3% Jan '99 to Jan '00: +3.5% YTD '99 to YTD '00: +3.5% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul

214

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

July '99 to Aug. '99: +4.7% July '99 to Aug. '99: +4.7% Aug. '98 to Aug. '99: +1.3% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -1.9% Aug. '98 to Aug. '99: -0.4% YTD '98 to YTD '99: +0.9% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -0.1% Aug. '98 to Aug. '99: -1.4% YTD '98 to YTD '99: -0.7% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: +22.3% Aug. '98 to Aug. '99: +21.1%

215

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Aug '99 to Sep '99: +4.9% Aug '99 to Sep '99: +4.9% Sep '98 to Sep '99: +4.7% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.4% Sep '98 to Sep '99: +0.4% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.1% Sep '98 to Sep '99: +4.6% YTD '98 to YTD '99: 0.0% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: +7.3% Sep '98 to Sep '99: +8.4% YTD '98 to YTD '99: +8.3%

216

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Oct '99 to Nov '99: +0.1% Oct '99 to Nov '99: +0.1% Nov '98 to Nov '99: +5.5% YTD '98 to YTD '99: +4.5% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: -0.7% Nov '98 to Nov '99: +1.7% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +2.5% Nov '98 to Nov '99: +6.0% YTD '98 to YTD '99: +0.8% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +9.7% Nov '98 to Nov '99: +2.2% YTD '98 to YTD '99: +6.2%

217

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Sep '99 to Oct '99: +3.9% Sep '99 to Oct '99: +3.9% Oct '98 to Oct '99: +2.3% YTD '98 to YTD '99: +4.4% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -0.2% Oct '98 to Oct '99: -0.9% YTD '98 to YTD '99: +1.0% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -1.9% Oct '98 to Oct '99: -0.7% YTD '98 to YTD '99: +0.4% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -2.1% Oct '98 to Oct '99: -6.4% YTD '98 to YTD '99: +6.6%

218

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

June '99 to July '99: -5.4% June '99 to July '99: -5.4% July '98 to July '99: +3.3% YTD '98 to YTD '99: +6.3% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: -0.5% July '98 to July '99: -0.4% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +0.5% July '98 to July '99: +1.0% YTD '98 to YTD '99: -0.3% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +1.5% July '98 to July '99: +10.2% YTD '98 to YTD '99: +7.2%

219

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Nov '99 to Dec '99: +5.3% Nov '99 to Dec '99: +5.3% Dec '98 to Dec '99: +8.7% YTD '98 to YTD '99: +5.0% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +6.0% Dec '98 to Dec '99: +4.5% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +2.4% Dec '98 to Dec '99: +3.0% YTD '98 to YTD '99: +0.9% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +32.3% Dec '98 to Dec '99: +2.0% YTD '98 to YTD '99: +5.5%

220

Rate Adjustments and Public Involvement  

NLE Websites -- All DOE Office Websites (Extended Search)

Rate Adjustments and Public Involvement Documents Rate Adjustments and Public Involvement Documents CRSP Transmission 9/16/2013 WAPA-161 FRN, CRSP transmission and ancillary services rates extension Letter announcing two-year extension to CRSP transmission and ancillary services rates Letter announcing revised CRSP transmission rates for FY 2014 Accompanying calculation table for FY 2014 CRSP transmission rate letter Letter announcing revised CRSP transmission rates for FY 2013 Letter announcing revised CRSP transmission rates for FY 2012 Letter announcing revised CRSP transmission rates for FY 2011 Letter announcing revised CRSP transmission rates for FY 2010 SLCA/IP 9/16/2013 WAPA-161 FRN, SLCA/IP firm power rate extension Letter announcing two-year extension to SLCA/IP firm power rate SLCA/IP Tentative Rate Adjustment Schedule

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

PULSE RATE DIVIDER  

DOE Patents (OSTI)

A compact pulse-rate divider circuit affording low impedance output and high input pulse repetition rates is described. The circuit features a single secondary emission tube having a capacitor interposed between its dynode and its control grid. An output pulse is produced at the anode of the tube each time an incoming pulse at the control grid drives the tube above cutoff and the duration of each output pulse corresponds to the charging time of the capacitor. Pulses incoming during the time the grid bias established by the discharging capacitor is sufficiently negative that the pulses are unable to drive the tube above cutoff do not produce output pulses at the anode; these pulses are lost and a dividing action is thus produced by the circuit. The time constant of the discharge path may be vanied to vary in turn the division ratio of the circuit; the time constant of the charging circuit may be varied to vary the width of the output pulses. (AEC)

McDonald, H.C. Jr.

1962-12-18T23:59:59.000Z

222

Survey of innovative rates, 1991  

SciTech Connect

Current innovative rate data from 135 major utilities throughout the United States were gathered and analyzed. Over 1000 innovative rates that were in use by the utilities in 1990 and 1991 were identified, abstracted and entered into a database. Survey results indicate that over 616 million MWh were sold to the nearly five million customers using the innovative rates offered. From an annual sales perspective, the most widely used rates are demand-side management rates -- rates intended to change customer energy use -- and rates that are market-driven.'' The survey identified 525 demand-side management rates serving our four million customers with reported sales of approximately 520 million MWh. These rates serve over 80% of the total innovative rate customers and account for 84% of the total MWh sales. Also important in terms of MWh sales they represent are market-driven rates, which accounted for sales of 48 million MWh in 1990. Both demand-side management and market-driven rates show a 20% customer growth rate between 1988 and 1990. Other innovative rates examined in the survey included: prepaid service; load retention incentive rates; technology specific rates; and those rates related expressly to non-utility generators -- namely buy-back and standby rates.

White, L.J.; Wakefield, R.A.; McVicker, C.M.

1992-04-01T23:59:59.000Z

223

Survey of innovative rates, 1991  

Science Conference Proceedings (OSTI)

Current innovative rate data from 135 major utilities throughout the United States were gathered and analyzed. Over 1000 innovative rates that were in use by the utilities in 1990 and 1991 were identified, abstracted and entered into a database. Survey results indicate that over 616 million MWh were sold to the nearly five million customers using the innovative rates offered. From an annual sales perspective, the most widely used rates are demand-side management rates -- rates intended to change customer energy use -- and rates that are market-driven.'' The survey identified 525 demand-side management rates serving our four million customers with reported sales of approximately 520 million MWh. These rates serve over 80% of the total innovative rate customers and account for 84% of the total MWh sales. Also important in terms of the MWh sales they represent are market-driven rates, which accounted for sales of 48 million MWh in 1990. Both demand-side management and market-driven rates show a 20% customer growth rate between 1988 and 1990. Other innovative rates examined in the survey included: prepaid service; load retention incentive rates; technology specific rates; and those rates related expressly to non-utility generators -- namely buy-back and standby rates.

White, L.J.; Wakefield, R.A.; McVicker, C.M.

1992-04-01T23:59:59.000Z

224

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facilty Location Evaluation for Franklin-Badger Canyon 230-kV Line and Badger Canyon Substation Study Area 74-6B.  

SciTech Connect

Proposed is the construction of a 15-mile, 230-kV double-circuit transmission line from Franklin Substation near Pasco, Washington, to a proposed new Badger Canyon Substation to be constructed 5 miles west of Kennewick, Washington. Depending on the final route location chosen, approximately 15 miles of 230-kV double circuit transmission line requiring 5.6 miles of new and 9.4 miles of existing right-of-way would be needed as well as approximately 2500 feet of new access road. Land use affected includes crossing Sacajawea State Park and passig through irrigated cropland and grassland on existing right-of-way, and depending on the alternative route chosen, could cross land proposed for residential development and a proposed interstate highway. An additional 10 to 11 acres of potential cropland would be required for the proposed substation. Disturbance to wildlife during construction would occur and habitat associated with the above land uses would be eliminated. Some erosion and sedimentation would occur. Visual impacts would affect Sacajawea State Park, a proposed highway, and potential residential development land. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

225

Abstract--This paper demonstrates the results from a detailed study of the overvoltage protection of a particular  

E-Print Network (OSTI)

protection of a particular 400/150 kV 400 MVA power transformer. The work presented here is based on real.dk about the effectiveness of the lightning protection of the transformers now used at Energinet.dk's power stations. The possibility of this happening again to any of the other power transformers in Eltra

Bak, Claus Leth

226

Progress of the EAST Project in China Y.X. Wan, P.D. Weng, J.G. Li, D.M. Gao, S.T. Wu  

E-Print Network (OSTI)

and Engineering Missions of the EAST Project are: · to study physical issues of the advanced steady- state machine hall and other appurtenant buildings · 110 kV/83 MVA transmission line and transformer substation attention has been paid on NbTi superconductivity engineering development Several types of CICC were

227

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

228

electric rates | OpenEI  

Open Energy Info (EERE)

electric rates electric rates Dataset Summary Description This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011. Source NREL and Ventyx Date Released February 24th, 2012 (2 years ago) Date Updated Unknown Keywords electric rates rates US utilities Data text/csv icon IOU rates by zipcode (csv, 1.7 MiB) text/csv icon Non-IOU rates by zipcode (csv, 2.1 MiB)

229

Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

230

National Utility Rate Database: Preprint  

DOE Green Energy (OSTI)

When modeling solar energy technologies and other distributed energy systems, using high-quality expansive electricity rates is essential. The National Renewable Energy Laboratory (NREL) developed a utility rate platform for entering, storing, updating, and accessing a large collection of utility rates from around the United States. This utility rate platform lives on the Open Energy Information (OpenEI) website, OpenEI.org, allowing the data to be programmatically accessed from a web browser, using an application programming interface (API). The semantic-based utility rate platform currently has record of 1,885 utility rates and covers over 85% of the electricity consumption in the United States.

Ong, S.; McKeel, R.

2012-08-01T23:59:59.000Z

231

Operational dose rate visualization techniques  

SciTech Connect

The analysis of the gamma ray dose rate in the vicinity of a radiation source can be greatly aided by the use of recent state-of-the-art visualization techniques. The method involves calculating dose rates at thousands of locations within a complex geometry system. This information is then processed to create contour plots of the dose rate. Additionally, when these contour plots are created, animations can be created that dynamically display the dose rate as the shields or sources are moved.

Schwarz, R.A.; Morford, R.J.; Carter, L.L.; Jones, G.B.; Greenborg, J.

1994-01-01T23:59:59.000Z

232

DOE Guidance-Category Rating  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum is to establish the Department of Energy's (DOE's) policy for the use of Category Rating.

233

ARCS – Access Rate Control System  

protected steel housing. ... Access Rate Control System This rugged, maintenance- ... Y-12 is seeking an industry partner to fully com-

234

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

235

Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

236

Asymptotic Cellular Growth Rate as the Effective Information Utilization Rate  

E-Print Network (OSTI)

We study the average asymptotic growth rate of cells in randomly fluctuating environments. Using a game-theoretic perspective, we show that any response strategy has an asymptotic growth rate, which is the sum of: (i) the maximal growth rate at the worst possible distribution of environments, (ii) relative information between the actual distribution of environments to the worst one, and (iii) information utilization rate which is the information rate of the sensory devices minus the "information dissipation rate", the amount of information not utilized by the cell for growth. In non-stationary environments, the optimal strategy is the time average of the instantaneous optimal strategy and the optimal switching times are evenly spaced in the statistical (Fisher) metric.

Pugatch, Rami; Tlusty, Tsvi

2013-01-01T23:59:59.000Z

237

2011 Heat Rate Improvement Conference  

Science Conference Proceedings (OSTI)

With the rising cost of fuel and the strong possibility of CO2 emissions regulations and limitations in the near future, utilities and power generation companies are focusing on power plant heat rate and performance. The Electric Power Research Institute (EPRI) 17th Heat Rate Improvement Conference is the latest in a series of meetings designed to assist attendees in addressing problems with power plant performance and in identifying cost-effective solutions for achieving and sustaining heat rate improve...

2011-03-28T23:59:59.000Z

238

Search Results for 'Credit Rating'  

U.S. Energy Information Administration (EIA)

The rating agency says it expects the bank’s asset quality to remain weak over the next 12-18 months

239

Exchange rate determination in Indonesia.  

E-Print Network (OSTI)

??This thesis examines the options for adopting normative and prescriptive models of exchange rate determination suitable for developed and developing countries. It also develops a… (more)

Rusydi, Mohammad

2006-01-01T23:59:59.000Z

240

Definition: Rating | Open Energy Information  

Open Energy Info (EERE)

power, such as transformers, or transport it from one location to another, such as transmission lines, the power rating almost always refers to the maximum power flow...

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Sustainable Building Rating Systems Summary  

SciTech Connect

The purpose of this document is to offer information that could be used to compare and contrast sustainable building rating systems.

Fowler, Kimberly M.; Rauch, Emily M.

2006-07-01T23:59:59.000Z

242

June 1 Government Rate $137  

NLE Websites -- All DOE Office Websites (Extended Search)

& Fitness Center The Jewelry Box & Gift Shoppe 24 Hour Front Desk Service, Sundry Shop, ATM Wireless Internet Always Complimentary 112 per night room rate effective thru April...

243

Server efficiency rating tool (SERT)  

Science Conference Proceedings (OSTI)

The Server Efficiency Rating Tool (SERT) [1] has been developed by Standard Performance Evaluation Corporation (SPEC) [2] at the request of the US Environmental Protection Agency (EPA) [3], prompted by concerns that US datacenters consumed almost 3% ... Keywords: benchmark, datacenter, energy efficiency, energy star, environmental protection agency, epa, power, rating tool, sert, server, spec

Klaus-Dieter Lange; Mike G. Tricker; Jeremy A. Arnold; Hansfried Block; Sanjay Sharma

2012-04-01T23:59:59.000Z

244

Commercial Building Asset Rating Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 eere.energy.gov 1 eere.energy.gov Commercial Building Asset Rating Program August 23, 2011 12 p.m. ET, 9 a.m. PT Presenter: Cody Taylor PRE-DECISIONAL Information included in this document is for discussion purposes and does not constitute the final program design. FOR INFORMATION ONLY 2 eere.energy.gov Outline * Goals * Scope & schedule * Guiding principles * Program design issues - Metrics - Rating method - Rating scale - Opportunities for efficiency improvement - Quality assurance Please submit clarifying questions during today's webinar via the Q&A function of Live Meeting. 3 eere.energy.gov National Building Rating Program Goals * Facilitate cost-effective investment in energy efficiency and reduce energy use in the commercial building sector * Establish a national standard for voluntary commercial building asset rating

245

Supernova rates and stellar populations  

E-Print Network (OSTI)

We discuss the results about the nature of type Ia Supernovae that can be derived by studying their rates in different stellar populations. While the evolution of SN photometry and spectra can constrain the explosion mechanism, the SN rate depends on the progenitor system. We review the current available data on rates as a function of parent galaxy color, morphology, star formation rate, radio luminosity and environment. By studying the variation of the rates with the color of the parent galaxy, a strong evidence was established that type Ia SNe come from both young and old stars. The dependence of the rates with the radio power of the parent galaxy is best reproduced by a bimodal distribution of delay time between the formation of the progenitor and its explosion as a SN. Cluster early-type galaxies show higher type Ia SN rate with respect to field galaxies, and this effect can be due either to traces of young stars or to differences in the delay time distribution.

F. Mannucci

2007-08-03T23:59:59.000Z

246

OpenEI - electric rates  

Open Energy Info (EERE)

U.S. Electric Utility U.S. Electric Utility Companies and Rates: Look-up by Zipcode (Feb 2011) http://en.openei.org/datasets/node/899 This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011.

247

DOE Guidance-Category Rating  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 2010 MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SARA"iJ. Boku1, DIRECToR OF HUMAN C~TAL MANAGEMENT SUBJECT: GUIDANCE MEMORANDUM #10 CATEGORY RATING The purpose of this memorandum is to establish the Department of Energy's (DOE's) policy for the use of Category Rating. Authorities: Public Law 107-296; Title 5 USC 3319; 5 CFR, Part 337, Subpart C., Presidential Memorandum of May 11, 2010 This guidance is established in accordance with 5 USC 3319, which authorizes Federal Agencies to use alternative rating proced.ures in assessing applicants for employment using category rating and selection procedures, and to ensure consistency in complying with federal regulations contained in the Code of Federal Regulations (CFR), Office of Personnel Management (OPM) and the Department of

248

ARM - Measurement - Radiative heating rate  

NLE Websites -- All DOE Office Websites (Extended Search)

govMeasurementsRadiative heating rate govMeasurementsRadiative heating rate ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Radiative heating rate The heating rate due to the divergence of long and shortwave radiative flux. Categories Radiometric, Atmospheric State Instruments The above measurement is considered scientifically relevant for the following instruments. Refer to the datastream (netcdf) file headers of each instrument for a list of all available measurements, including those recorded for diagnostic or quality assurance purposes. External Instruments MOLTS : Model Output Location Time Series Datastreams MOLTS : Model Output Location Time Series Datastreams MOLTSEDASSNDCLASS1 : Model Output Loc. Time Ser. (MOLTS): EDAS

249

Heat Rate Improvement Reference Manual  

Science Conference Proceedings (OSTI)

Performance optimization of fossil power plants is a high priority within the electric utilities in the new competitive environment. This manual can help utility engineers establish a heat rate improvement program.

1998-07-27T23:59:59.000Z

250

Project Definition Rating Index (PDRI)  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for...

251

High compression rate text summarization  

E-Print Network (OSTI)

This thesis focuses on methods for condensing large documents into highly concise summaries, achieving compression rates on par with human writers. While the need for such summaries in the current age of information overload ...

Branavan, Satchuthananthavale Rasiah Kuhan

2008-01-01T23:59:59.000Z

252

Exchange Rates, Information, and Crises  

E-Print Network (OSTI)

equation (5.4). Standard Bayesian inference implies that theAs before, standard Bayesian inference implies that Var 1 [f˜ so that standard Bayesian inference both exchange rate is

Fernholz, Ricardo Turrin

2011-01-01T23:59:59.000Z

253

A Successful Cool Storage Rate  

E-Print Network (OSTI)

Houston Lighting & Power (HL&P) initiated design and development of its commercial cool storage program as part of an integrated resource planning process with a targeted 225 MW of demand reduction through DSM. Houston's extensive commercial air conditioning load, which is highly coincident with HL&P's system peak, provided a large market for cool storage technologies. Initial market research made it very clear that a special cool storage rate was required to successfully market the technology. Development of the rate required an integrated, multidepartment effort and extensive use of DSManager, an integrated resource planning model. An experimental version of the rate was initially implemented as part of the initial phase of the cool storage program. A permanent rate, incorporating lessons learned from the experimental rate, was then developed for the long term implementation of the program. The permanent rate went through a lengthy regulatory approval process which included intervention by a local natural gas distribution company. The end result is a very successful cool storage program with 52 projects and 31 megawatts of demand reduction in the first three and one-half years of program implementation.

Ahrens, A. C.; Sobey, T. M.

1994-01-01T23:59:59.000Z

254

Transformer requirements for the year 2000. Final report, December 1979  

Science Conference Proceedings (OSTI)

The principal objective of this program was to determine the design parameters required for transformers of the year 2000. The approach to meeting this objective was to determine the changes which may occur in transmission and distribution systems over the next twenty years, and how these changes might affect design parameters of distribution and power transformers. Emphasis was placed on domestic requirements, although the impact of international practices was factored into the overall requirements for transformers. Possible investigations that could help transformer designers meet the long term technical requirements of future transformers were also identified. The principal conclusions of this study were: 1200 kV transmission could be in service by the late 1980's and it is essential to develop 1200 kV transformers for these systems; transformer manufacturers must be prepared to supply higher MVA ratings at all voltage levels; there will be a strong demand for low-loss, minimum cost transformers; and environmental/safety, reliability, and size reduction considerations will increase in importance. (LLL)

Not Available

1980-06-01T23:59:59.000Z

255

Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section Page S:\COMM\NEPA\TODO \EA1383\EATOC1 -R.DOC 4/1/02 -i- 1.0 INTRODUCTION 1-1 1.1 BACKGROUND 1-1 1.2 SCOPE OF PROJECT 1-2 1.3 PURPOSE AND NEED 1-3 1.4 AGENCY ACTIONS 1-3 1.4.1 Federal 1-3 1.4.1.1 U.S. Department of Energy 1-3 1.4.1.2 U.S. Fish and Wildlife Service 1-4 1.4.2 Other Agenc y Actions 1-4 1.4.2.1 California Energy Commission 1-4 1.4.2.2 California Department of Fish and Game 1-4 1.4.2.3 State Historic Preservation Office 1-5 1.4.2.4 San Diego County 1-5 2.0 PROPOSED ACTION AND ALTERNATIVES 2-1 2.1 NO ACTION ALTERNATIVE 2-1 2.2 PROPOSED ACTION 2-1 2.2.1 Proposed Amendment to Presidential Permit (PP-68) 2-2 2.2.2 Description of Proposed Project Components and Activities 2-3 2.2.2.1 Otay Mesa 230 kV Switchyard 2-3

256

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

257

Standard Rates, Budget Office, Brookhaven National Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

Standard Rates Standard Rates for Brookhaven National Laboratory is available in PDF file formats. This file contains rates for Distributed Technical Services, Scientific Devices...

258

LINEAR COUNT-RATE METER  

DOE Patents (OSTI)

A linear count-rate meter is designed to provide a highly linear output while receiving counting rates from one cycle per second to 100,000 cycles per second. Input pulses enter a linear discriminator and then are fed to a trigger circuit which produces positive pulses of uniform width and amplitude. The trigger circuit is connected to a one-shot multivibrator. The multivibrator output pulses have a selected width. Feedback means are provided for preventing transistor saturation in the multivibrator which improves the rise and decay times of the output pulses. The multivibrator is connected to a diode-switched, constant current metering circuit. A selected constant current is switched to an averaging circuit for each pulse received, and for a time determined by the received pulse width. The average output meter current is proportional to the product of the counting rate, the constant current, and the multivibrator output pulse width.

Henry, J.J.

1961-09-01T23:59:59.000Z

259

Coal Transportation Rate Sensitivity Analysis  

Reports and Publications (EIA)

On December 21, 2004, the Surface Transportation Board (STB) requested that the Energy Information Administration (EIA) analyze the impact of changes in coal transportation rates on projected levels of electric power sector energy use and emissions.Specifically, the STB requested an analysis of changes in national and regional coalconsumption and emissions resulting from adjustments in railroad transportation rates for Wyoming's Powder River Basin (PRB) coal using the National Energy Modeling System(NEMS). However, because NEMS operates at a relatively aggregate regional level and does not represent the costs of transporting coal over specific rail lines, this analysis reports on the impacts of interregional changes in transportation rates from those used in the Annual Energy Outlook 2005 (AEO2005) reference case.

John Conti

2005-04-01T23:59:59.000Z

260

Billiards with polynomial mixing rates  

E-Print Network (OSTI)

While many dynamical systems of mechanical origin, in particular billiards, are strongly chaotic -- enjoy exponential mixing, the rates of mixing in many other models are slow (algebraic, or polynomial). The dynamics in the latter are intermittent between regular and chaotic, which makes them particularly interesting in physical studies. However, mathematical methods for the analysis of systems with slow mixing rates were developed just recently and are still difficult to apply to realistic models. Here we reduce those methods to a practical scheme that allows us to obtain a nearly optimal bound on mixing rates. We demonstrate how the method works by applying it to several classes of chaotic billiards with slow mixing as well as discuss a few examples where the method, in its present form, fails.

Nikolai Chernov; Hong-Kun Zhang

2004-09-12T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Property:OpenEI/UtilityRate/DemandRateStructure/Tier4Rate | Open Energy  

Open Energy Info (EERE)

Rate" Rate" Showing 13 pages using this property. 4 4b524791-bef2-49b1-850b-458730755203 + 5 +, 6 +, 3 +, ... 4b524791-bef2-49b1-850b-458730755203 + 6 + 4b524791-bef2-49b1-850b-458730755203 + 3 + 4b524791-bef2-49b1-850b-458730755203 + 7 + 4b524791-bef2-49b1-850b-458730755203 + 5 + 4b524791-bef2-49b1-850b-458730755203 + 8 + 4b524791-bef2-49b1-850b-458730755203 + 5 + 4b524791-bef2-49b1-850b-458730755203 + 5 + 4b524791-bef2-49b1-850b-458730755203 + 6 + 4b524791-bef2-49b1-850b-458730755203 + 6 + E E40880ac-c27b-4cbf-a011-b0d7d6e10fe9 + 1 + E40880ac-c27b-4cbf-a011-b0d7d6e10fe9 + 1 + E40880ac-c27b-4cbf-a011-b0d7d6e10fe9 + 1 + Retrieved from "http://en.openei.org/w/index.php?title=Property:OpenEI/UtilityRate/DemandRateStructure/Tier4Rate&oldid=53975

262

Energy Management Through Innovative Rates  

E-Print Network (OSTI)

Increased costs and a continuing dependence on uncertain supplies of domestic and foreign energy resources have prompted many companies to focus their attention on energy management. The author explores the potential for achieving a greater measure of energy efficiency in the industrial sector and specific rate design alternatives for doing so.

Williams, M. L.

1982-01-01T23:59:59.000Z

263

SIL rating fire protection equipment  

Science Conference Proceedings (OSTI)

SIL's (Safety Integrity Levels) are used by IEC 61508:1998 [1] to characterise the required functional safety of computer control systems. For example, SIL 4, the highest rating is for fly by wire aircraft and weapons systems and track circuited train ... Keywords: SIL, fire control panels, fire systems

Richard M. Robinson; Kevin J. Anderson

2003-10-01T23:59:59.000Z

264

Fast repetition rate (FRR) flasher  

DOE Patents (OSTI)

A fast repetition rate (FRR) flasher is described suitable for high flash photolysis including kinetic chemical and biological analysis. The flasher includes a power supply, a discharge capacitor operably connected to be charged by the power supply, and a flash lamp for producing a series of flashes in response to discharge of the discharge capacitor. A triggering circuit operably connected to the flash lamp initially ionizes the flash lamp. A current switch is operably connected between the flash lamp and the discharge capacitor. The current switch has at least one insulated gate bipolar transistor for switching current that is operable to initiate a controllable discharge of the discharge capacitor through the flash lamp. Control means connected to the current switch for controlling the rate of discharge of the discharge capacitor thereby to effectively keep the flash lamp in an ionized state between successive discharges of the discharge capacitor. Advantageously, the control means is operable to discharge the discharge capacitor at a rate greater than 10,000 Hz and even up to a rate greater than about 250,000 Hz. 14 figs.

Kolber, Z.; Falkowski, P.

1997-02-11T23:59:59.000Z

265

Electric Rate Alternatives to Cogeneration  

E-Print Network (OSTI)

This paper discusses electric rate alternatives to cogeneration for the industrial customer and attempts to identify the effects on the utility company, the industrial customer as well as remaining customers. It is written from the perspective of one company and its exposure to cogenerstion within its service territory.

Sandberg, K. R. Jr.

1988-09-01T23:59:59.000Z

266

Instability statistics and mixing rates  

E-Print Network (OSTI)

We claim that looking at probability distributions of \\emph{finite time} largest Lyapunov exponents, and more precisely studying their large deviation properties, yields an extremely powerful technique to get quantitative estimates of polynomial decay rates of time correlations and Poincar\\'e recurrences in the -quite delicate- case of dynamical systems with weak chaotic properties.

Roberto Artuso; Cesar Manchein

2009-06-03T23:59:59.000Z

267

2010FirmRateAdj  

NLE Websites -- All DOE Office Websites (Extended Search)

Firm Peaking Revenue Requirement 320.2 million P-SMPB--ED Composite Rate 33.25 millskWh Firm Demand 7.65kWmo Firm Energy 19.05 millskWh Firm Peaking Demand 6.90kWmo Firm...

268

Hardware implementation of wireless bit rate adaptation  

E-Print Network (OSTI)

This thesis presents a hardware implementation of the SoftRate bit-rate adaptation protocol. SoftRate is a new bit-rate adaptation protocol, which uses per-bit confidence hints generated by the convolutional decoder to ...

Gross, Samuel A

2010-01-01T23:59:59.000Z

269

The impact of ventilation rate on the emission rates of volatile...  

NLE Websites -- All DOE Office Websites (Extended Search)

impact of ventilation rate on the emission rates of volatile organic compounds in residences Title The impact of ventilation rate on the emission rates of volatile organic...

270

Building Energy Performance Certificate. Asset Rating.  

U.S. Energy Information Administration (EIA)

Non-Domestic Building Energy Performance Asset Rating ... Asset Rating. Author: BRE Subject: LCEA029636 Keywords: Energy Performance Certificate ...

271

Energy Efficiency Interest Rate Reduction Program | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interest Rate Reduction Program Energy Efficiency Interest Rate Reduction Program Eligibility Residential Savings For Heating & Cooling Home Weatherization Construction Commercial...

272

Western Area Power Administration, Desert Southwest Region Facilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Ratings Project Hoover-Mead 1 and 5 230-kV and Mead-Marketplace 500-kV Transmission Lines Continuation Sheet Project Description (Continued) Hoover-Mead 1 230-kV...

273

Federal Energy Management Program: Water Rate Escalations  

NLE Websites -- All DOE Office Websites (Extended Search)

Rate Rate Escalations to someone by E-mail Share Federal Energy Management Program: Water Rate Escalations on Facebook Tweet about Federal Energy Management Program: Water Rate Escalations on Twitter Bookmark Federal Energy Management Program: Water Rate Escalations on Google Bookmark Federal Energy Management Program: Water Rate Escalations on Delicious Rank Federal Energy Management Program: Water Rate Escalations on Digg Find More places to share Federal Energy Management Program: Water Rate Escalations on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Greenhouse Gases Water Efficiency Basics Federal Requirements Best Management Practices Analysis and Evaluation Water Rate Escalations Evaluation Service Contracts Case Studies Resources

274

P-D Project Rate Adjustment  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Davis Project Rate Adjustment Data Parker-Davis Project Rate Adjustment Data FY2014 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2013 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Supplemental Information Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2012 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Customer Requested Scenario Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2011 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design

275

Further Study on Atmospheric Lapse Rate Regimes  

Science Conference Proceedings (OSTI)

Lapse rate, moist adiabatic lapse rate and the critical lapse rate for baroclinic adjustment are calculated as was done by Stone and Carlson using a different data set covering both hemispheres. Results show very good agreement in low latitudes, ...

Shi-Keng Yang; G. Louis Smith

1985-05-01T23:59:59.000Z

276

Narrowing the estimates of species migration rates  

E-Print Network (OSTI)

of species migration rates How fast can species migrate?estimate population growth rates for each population sinceon their data 1 show that the rate of population spread is

Blois, Jessica L.

2013-01-01T23:59:59.000Z

277

Metallurgical Principles and Practice of Engineering (PE) Study Guide  

Science Conference Proceedings (OSTI)

... furnace has a nominal rating of 150 tons and is charged with scrap at 60°F. Electric power is delivered by three-phase current at 120 MVA (120 × 106 volt-

278

500-kV Transmission Line Design  

Science Conference Proceedings (OSTI)

The design of an extrahigh-voltage (EHV) transmission line involves an integrated analysis and comparison of influencing factors to develop a structure configuration and conductor/shieldwire system that will provide safe, reliable, and economic service. Many of the parameters in design have varied impacts on the performance characteristics of a transmission line: safety, reliability, capital cost, and lifetime cost. The interdependencies are many and technical in nature. Having a solid knowledge of the p...

2011-02-04T23:59:59.000Z

279

CRSP Transmission Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

280

4. Trends in Natural Gas Transportation Rates  

U.S. Energy Information Administration (EIA)

Energy Information Administration 39 Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates 4. Trends in Natural Gas Transportation Rates

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Definition: Thermal Rating | Open Energy Information  

Open Energy Info (EERE)

Rating Jump to: navigation, search Dictionary.png Thermal Rating The maximum amount of electrical current that a transmission line or electrical facility can conduct over a...

282

Form:Utility Rate | Open Energy Information  

Open Energy Info (EERE)

Form Edit History Facebook icon Twitter icon Form:Utility Rate Jump to: navigation, search Add or Update Utility Rate Information Retrieved from "http:en.openei.orgw...

283

U.S. Department of Energy Categorical Exclusion Determination Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Glen Canyon Substation Stage 09- Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition Program or Field Office: DOE/Western/Desert Southwest Region Location(s) (City/County/State): Glen Canyon Substation, Page/Coconino County/Arizona Proposed Action Description: Submit by E-mail Western proposes to conduct electrical maintenance activities within the existing Glen Canyon Substation located at Page, Coconino County, Arizona. The project is on federal (Western-owned) property in Section 19 Township 41 N, Range 8 East, in every quarter sections 24 and 25, Coconino County, AZ, (Gila and Salt River Baseline and Meridian; Figure 1 ). The proposed scope of work includes the following (Figure 2): ·Install one 50MVA 230/69KV transformer to a new storage pad in the upper yard. The new pad will measure 26 feet 6 inches long by 16 feet

284

utility rate | OpenEI Community  

Open Energy Info (EERE)

utility rate utility rate Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 11:14 Utility Rates API Version 2 is Live! API developer OpenEI update utility Utility Companies utility rate Utility Rates version 1 version 2 version 3 web service Smart meter After several months of development and testing, the next generation web service for the utility rate database is finally here! I encourage you to check out the V2 Utility Rates API at http://en.openei.org/services/doc/rest/util_rates Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 June, 2012 - 09:30 Increasing ask query limit developer utility rate An NREL user who is trying to use the utility rate service was having an issue. He writes "I noticed that any rates past 10,000 are not accessible via json. For example, this query only returns two entries:

285

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

286

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

287

Property:OpenEI/UtilityRate/EnergyRateStructure/Tier5Rate | Open Energy  

Open Energy Info (EERE)

Rate" Rate" Showing 25 pages using this property. (previous 25) (next 25) 0 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.227 + 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.227 + 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.227 + 019be14c-4635-4529-af90-799cbf5d7865 + 0.0335 + 019be14c-4635-4529-af90-799cbf5d7865 + 0.0335 + 02b061e1-f065-421e-9ebc-76aef4734486 + 0.079 + 02b061e1-f065-421e-9ebc-76aef4734486 + 0.079 + 02fc76fd-35ff-44c3-bc85-1fb1918f125b + 0.0978 + 02fc76fd-35ff-44c3-bc85-1fb1918f125b + 0.0978 + 0402cc99-ab16-40cc-83e7-2c5910a825a1 + 0.061 + 0402cc99-ab16-40cc-83e7-2c5910a825a1 + 0.061 + 041466a9-81ca-4fce-90e3-e718159347a9 + 0.0587 +, 0.044 + 041466a9-81ca-4fce-90e3-e718159347a9 + 0.044 + 041466a9-81ca-4fce-90e3-e718159347a9 + 0.0587 + 047086c9-976d-4a05-90d5-b67afaf60851 + 0.0583 +

288

Conflict-Based Diagnosis of Discrete Event Systems: Theory and Practice Alban Grastien1,2  

E-Print Network (OSTI)

T WEST C0-6 RT=6 TD=3 IT=50 GF=0.5 TD=1.0 ITE-15-HK 1000 MVA 1200A 3-800/5 MULTI RATIO TO 87T 3 GFM 2 480 VAC 13.8 KV 7-A 7-B 2-B 2-A BREAKER SETTING 8-B 8-A 9-B 9-A 10-A 10-B 11-B 11-A NB-B NB-A 4

Grastien, Alban

289

TWRS privatization phase 1 electrical power system  

SciTech Connect

This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW).

Singh, G.

1997-05-30T23:59:59.000Z

290

Distributed Rate Allocation for Wireless Networks  

E-Print Network (OSTI)

This paper describes a distributed algorithm for rate allocation in wireless networks. As the main result, the paper establishes that this algorithm is throughput-optimal for very general class of throughput regions. In contrast to distributed on-off scheduling algorithms, this algorithm enables optimal utilization of physical layer schemes by scheduling multiple rate levels. The algorithm is based on a Markov process on these discrete set of rates with certain transition rates. For dealing with multiple rate levels, the paper introduces an important structure for the transition rates, which enable the design of appropriate update rule for these transition rates. The update uses local queue length information alone, and thus does not require global exchange of queue length information. In addition, the algorithm requires that each link can determine the feasibility of increasing its data-rate from the current value without reducing the data-rates of other links. Determining rate feasibility does not introduce...

Jose, Jubin

2010-01-01T23:59:59.000Z

291

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

KV1A Replacement KV1A Replacement Laramie County, Wyoming A. Brief Description of Proposal: Western Area Power Administration (Western) will replace transformer KV1A at the Archer Substation. The substation is located in township 14 North, range 65 West, Section 27 of Laramie County, Wyoming, at longitude 104° 38' 57" West, latitude 41 o 8' 43" North. The existing 220/115/13.8-kV, 166.7 MVA transformer KV1A is composed of three single phase 220/115-kV 55.5 MV A transformers. The A-phase (KV1A3) failed, but with the use of the mobile transformer KV1A still operates at a reduced capacity of 100 MV A. Western will replace this configuration with a single multi-phase unit. The new unit will be a 3-phase 230/115/13.8-kV 200 MV A transformer which will be installed in the same general location as the

292

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KV1A Replacement KV1A Replacement Laramie County, Wyoming A. Brief Description of Proposal: Western Area Power Administration (Western) will replace transformer KV1A at the Archer Substation. The substation is located in township 14 North, range 65 West, Section 27 of Laramie County, Wyoming, at longitude 104° 38' 57" West, latitude 41 o 8' 43" North. The existing 220/115/13.8-kV, 166.7 MVA transformer KV1A is composed of three single phase 220/115-kV 55.5 MV A transformers. The A-phase (KV1A3) failed, but with the use of the mobile transformer KV1A still operates at a reduced capacity of 100 MV A. Western will replace this configuration with a single multi-phase unit. The new unit will be a 3-phase 230/115/13.8-kV 200 MV A transformer which will be installed in the same general location as the

293

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

294

Computerized extrapolation of hydrolysis rate data  

Science Conference Proceedings (OSTI)

The program RATE was developed to aid in the extrapolation and interpretation of hydrolysis rate data to a format that is useful for environmental risk assessment. Hydrolysis data typically are reported in the literature as pseudo-first-order rate constants at the temperature and pH of the reaction medium used to obtain the kinetics information. The utility of RATE lies in its ability to estimate first-order rate constants at other values of temperature and pH and to convert pseudo-first-order rate constants to second-order rate constants. RATE also will calculate the half-life for the overall reaction, including neutral-, base-, and acid-mediated hydrolysis, at any selected temperature and pH. RATE, programmed in FORTRAN, is used to systematically analyze data for entry in FATE, a comprehensive environmental fate constants information system database.

Hamrick, K.J.; Kollig, H.P.; Bartell, B.A.

1992-01-01T23:59:59.000Z

295

1996 Wholesale Power and Transmission Rate Schedules.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

296

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Utility Rate > Posts by term > Utility Rate Content Group Activity By term Q & A Feeds Term: API Type Term Title Author Replies Last Post sort icon Blog entry API The utility rate database version 1 API is now deprecated Rmckeel 6 Sep 2013 - 14:00 Blog entry API Lighting Electricity Rates on OpenEI Sfomail 31 May 2013 - 12:04 Blog entry API Utility Rates API Version 2 is Live! Sfomail 17 May 2013 - 11:14 Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis

297

Cross-layer wireless bit rate adaptation  

E-Print Network (OSTI)

This paper presents SoftRate, a wireless bit rate adaptation protocol that is responsive to rapidly varying channel conditions. Unlike previous work that uses either frame receptions or signal-to-noise ratio (SNR) estimates ...

Vutukuru, Mythili

2009-01-01T23:59:59.000Z

298

Cross-Layer Wireless Bit Rate Adaptation  

E-Print Network (OSTI)

This paper presents SoftRate, a wireless bit rate adaptation protocol that is responsive to rapidly varying channel conditions. Unlike previous work that uses either frame receptions or signal-to-noise ratio (SNR) estimates ...

Vutukuru, Mythili

299

Transfer Rate vs. I/O Units  

NLE Websites -- All DOE Office Websites (Extended Search)

O Units Transfer Rate vs. IO Units These plots show the transfer rate from the IO benchmarks as a function of the number of elizaio units in use for each particular eliza at the...

300

OpenEI Community - utility rate  

Open Energy Info (EERE)

Rates API Rates API Version 2 is Live! http://en.openei.org/community/blog/utility-rates-api-version-2-live Smart meterAfter several months of development and testing, the next generation web service for the utility rate database is finally here! I encourage you to check out the V2 Utility Rates API at rates">http://en.openei.org/services/doc/rest/util_ratesrates-api-version-2-live" target="_blank">read more

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Cumulus Parameterization and Rainfall Rates I  

Science Conference Proceedings (OSTI)

Modeling of convective rainfall rates is a central problem in tropical meteorology. Toward numerical weather prediction efforts the semi-prognostic approach (i.e., a one time-step prediction of rainfall rates) provides a relevant test of cumulus ...

T. N. Krishnamurti; Y. Ramanathan; Hua-Lu Pan; Richard J. Pasch; John Molinari

1980-04-01T23:59:59.000Z

302

Why Oceanic Dissipation Rates Are Not Lognormal  

Science Conference Proceedings (OSTI)

In their derivation of the lognormal probability density function for volume-averaged dissipation rates, Gurvich and Yaglom assumed explicitly that these dissipation rates are statistically homogeneous and that the averaging scale is small ...

Hidekatsu Yamazaki; Rolf Lueck

1990-12-01T23:59:59.000Z

303

A Probability Distribution Model for Rain Rate  

Science Conference Proceedings (OSTI)

A systematic approach is suggested for modeling the probability distribution of rain rate. Rain rate, conditional on rain and averaged over a region, is modeled as a temporally homogeneous diffusion process with appropriate boundary conditions. ...

Benjamin Kedem; Harry Pavlopoulos; Xiaodong Guan; David A. Short

1994-12-01T23:59:59.000Z

304

Rain Rate Estimates from Differential Polarization Measurements  

Science Conference Proceedings (OSTI)

This paper presents an analysis of the accuracy of rain rate estimates from data observed with a radar that has alternating horizontal and vertical polarization. Theoretical accuracies of rain rates from the reflectivity, the differential ...

M. Sachidananda; D. S. Zrni?

1987-12-01T23:59:59.000Z

305

On-site Housing Rates | Staff Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Effective February 1, 2013 Rates for Occupancy < 30-Days Guest House* SingleDouble: 105.00 per day Housekeeping service is provided on all working days. *Alternatives to...

306

CONVERGENCE AND CONVERGENCE RATE OF STOCHASTIC ...  

E-Print Network (OSTI)

gence rate of { ?f(?n)2}n?0 and {f(?n)}n?0 is the slower of the rates O(??rˆ? n. ) (the ...... for ??,s nj ? knj+1. Then ...

307

Geomagnetic Reversals: Rates, Timescales, Preferred Paths,  

E-Print Network (OSTI)

Geomagnetic Reversals: Rates, Timescales, Preferred Paths, Statistical Models and Simulations: Geomagnetic reversals, Reversal rates, Paleointensity, Statistics of Geodynamo September 30, 2001 #12;Abstract Paleomagnetic data on geomagnetic reversals are divided into two general categories: times of occurrence

Constable, Catherine G.

308

Rio Grande Project Power Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Sales Rate History Updated: 1022009 Rate Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) R5-F1 1940 - 1949 3.000 - 8.000 (declining...

309

Collbran Project Power Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Sales Rate History Updated: 1022009 Rate Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) Contract 1262 - 1283 (Firm Only) (Nonfirm...

310

Effects of Sequence Partitioning on Compression Rate  

E-Print Network (OSTI)

In the paper, a theoretical work is done for investigating effects of splitting data sequence into packs of data set. We proved that a partitioning of data sequence is possible to find such that the entropy rate at each subsequence is lower than entropy rate of the source. Effects of sequence partitioning on overall compression rate are argued on the bases of partitioning statistics, and then, an optimization problem for an optimal partition is defined to improve overall compression rate of a sequence.

Alagoz, B Baykant

2010-01-01T23:59:59.000Z

311

Science & Technology Principal Directo rate – Industrial ...  

Erik Stenehjem Science & Technology Principal Directo rate – Industrial Partnerships Office Erik Stenehjem Director----Roger Werne Deputy Director

312

Reproduction Rates for 1990–2002 and Intrinsic Rates for 2000–2001: United States  

E-Print Network (OSTI)

Objective—This report presents revised rates of reproduction for 1990–93, reproduction rates for 1994–2002, and intrinsic rates for 2000–2001. The revised rates for 1991–93 are based on populations consistent with the April 1, 2000, census, as are the rates for 1994–2002. Methods—Tabular and graphic data on the reproduction and intrinsic rates by race and Hispanic origin of mother are presented and described. Results—Rates of reproduction (total fertility, gross reproduction, and net reproduction rates), the intrinsic rate of natural increase, and the intrinsic birth rate were lower in 2001 (and 2002) than 1990. Among the race and Hispanic subgroups, the reproduction rates were lower for all groups except Cubans and whites (total). The overall intrinsic death rate increased between 1990 and 2001 with the rate declining for whites (total) but increasing for blacks (total).

Brady E. Hamilton, Ph.D.; Division Of Vital Statistics

2004-01-01T23:59:59.000Z

313

EPRI's Twelfth Heat Rate Improvement Conference Proceedings  

Science Conference Proceedings (OSTI)

The Twelfth Heat Rate Improvement Conference, sponsored by EPRI's Heat Rate and Cost Optimization Value Package, is the latest in a series of meetings designed to assist utilities in addressing problems with power plant performance and in identifying cost-effective solutions for achieving and maintaining heat rate improvement. The last conference was held in Baltimore in September 1998.

2001-01-22T23:59:59.000Z

314

Definition: Emergency Rating | Open Energy Information  

Open Energy Info (EERE)

Emergency Rating Emergency Rating Jump to: navigation, search Dictionary.png Emergency Rating The rating as defined by the equipment owner that specifies the level of electrical loading or output, usually expressed in megawatts (MW) or Mvar or other appropriate units, that a system, facility, or element can support, produce, or withstand for a finite period. The rating assumes acceptable loss of equipment life or other physical or safety limitations for the equipment involved.[1] Related Terms rating References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Emergency_Rating&oldid=480317" Categories:

315

Water Rate Escalations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rate Escalations Rate Escalations Water Rate Escalations October 8, 2013 - 9:55am Addthis Federal agencies need accurate water cost escalation rates to perform life cycle cost analyses for water efficiency projects to meet Executive Order 13514 and Energy Independence and Security Act of 2007 requirements. To estimate long-term escalation rates of potable water, Pacific Northwest National Laboratory (PNNL) conducted an analysis. Using the trends from this study, Federal facility managers can select escalation rates from studied cities with similar circumstances to their facility locations such as U.S. region, water source, or drought tendencies. Also they can make more informed choices on possible water escalation rates that can be used in economic analysis of water efficiency projects.

316

Utility Rates | OpenEI Community  

Open Energy Info (EERE)

Utility Rates Utility Rates Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 6 September, 2013 - 14:00 The utility rate database version 1 API is now deprecated API Utility Rates There comes a time in every API version's lifecycle when it needs to be deprecated. OpenEI's utility rate database version 1 API has been in use since the inception of the database in 2010. As Illinois State University has taken a commanding lead of the project and its data curation, we have updated the schema and API to version 2 to present a richer spectrum of utility rate data. Rmckeel's picture Submitted by Rmckeel(297) Contributor 11 June, 2013 - 09:33 Tip for working with approvals on OpenEI EZFeed Utility Rates The "ApprovedRevs" extension is the feature on OpenEI that allows

317

Definition: Dynamic Capability Rating | Open Energy Information  

Open Energy Info (EERE)

Capability Rating Capability Rating Jump to: navigation, search Dictionary.png Dynamic Capability Rating Dynamic capability rating can be achieved through real-time determination of an element's (e.g., line, transformer etc.) ability to carry load based on electrical and environmental conditions.[1] Related Terms rating References ↑ SmartGrid.gov 'Description of Functions' An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Dynamic_Capability_Rating&oldid=506158" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

318

Definition: Penetration Rate | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Penetration Rate Jump to: navigation, search Dictionary.png Penetration Rate The Rate of penetration, abbreviated as ROP as used in the drilling industry, is the speed at which a drill bit breaks the rock under it to deepen the borehole. It is normally measured in feet per minute or meters per hour, but sometimes it is expressed in minutes per foot.[1] View on Wikipedia Wikipedia Definition The Rate of penetration, abbreviated as ROP as used in the drilling industry, is the speed at which a drill bit breaks the rock under it to deepen the borehole. Also known as penetration rate or drill rate. It is normally measured in feet per minute or meters per hour, but sometimes it is expressed in minutes per foot.

319

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Utility Rate > Posts by term > Utility Rate Content Group Activity By term Q & A Feeds Term: developer Type Term Title Author Replies Last Post sort icon Blog entry developer Utility Rates API Version 2 is Live! Sfomail 17 May 2013 - 11:14 Discussion developer Utility rate change propagation is now much faster Rmckeel 1 21 Mar 2013 - 09:11 Blog entry developer OpenEI maintenance March 8-9, 2013 Rmckeel 8 Mar 2013 - 14:23 Blog entry developer Semantic Mediawiki Semantic Forms update Rmckeel 22 Oct 2012 - 07:23 Discussion developer Increasing ask query limit Rmckeel 1 28 Jun 2012 - 14:35 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank...

320

Rate-Making Policy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rate-Making Policy Rate-Making Policy Rate-Making Policy < Back Eligibility Investor-Owned Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 2005 State Wisconsin Program Type Generating Facility Rate-Making Provider Public Service Commission of Wisconsin WI Act 7 states that, when proposing the purchase or construction of an electric generating facility, a utility may "apply to the [WI Public Service Commission] for an order specifying in advance the rate-making principles" that the Public Service Commission will use for "future rate-making proceedings." The Nuclear Energy Institute highlights that "There is no restriction on

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

On loading rate effects in toughening processes  

SciTech Connect

Environmental crack tip reactions are a known source of premature fracture in oxides. These rate-dependent phenomena commonly are studied in strength tests where loading rate serves as the major experimental variable. A material susceptible to environmentally-assisted crack growth is stronger at fast testing rates. A topic which has received far less attention is the influence of stressing rate or loading rate on the shielding processes which occur at some distance from the crack tip, although the inverse has been studied by Deuerler et al. The authors present here the first known documentation of a loading rate effect on shielding phenomena in ceramic materials. For these experiments Coors AD 94 alumina was chosen for study.

Tandon, S.; Faber, K.T. [Northwestern Univ., Evanston, IL (United States)

1996-03-01T23:59:59.000Z

322

Loads, capacity, and failure rate modeling  

SciTech Connect

Both failure rate and load capacity (stress-strength) interferenece methodologies are employed in the reliability analysis at nuclear facilities. Both of the above have been utilized in a heuristic failure rate model in terms of load capacity inference. Analytical solutions are used to demonstrate that infant mortality and random aging failures may be expressed implicity in terms of capacity variability, load variability, and capacity deterioration, and that mode interactions play a role in the formation of the bathtub curve for failure rates.

Lewis, E.E.; Chen, Hsin-Chieh

1994-12-31T23:59:59.000Z

323

FERC rate incentives for transmission infrastructure development  

Science Conference Proceedings (OSTI)

With enactment of the Energy Policy Act of 2005, Congress delivered a mandate to the Federal Energy Regulatory Commission to establish regulations that would provide for incentive-based rate treatments for investments that would improvement the nation's electric transmission system. That has required FERC to move from merely approving cost-based rates for transmission services to enacting new regulations that would make it more attractive to invest in transmission infrastructure without offending the ''just and reasonable'' rate standard. (author)

Snarr, Steven W.

2010-03-15T23:59:59.000Z

324

2007 EPRI Heat Rate Improvement Conference Proceedings  

Science Conference Proceedings (OSTI)

Due to the rising cost of fuel and the growing possibility of carbon taxes in the not-too-distant future, utilities are once again focusing on the heat rate and performance of coal-fired power plants. The fifteenth Heat Rate Improvement Conference is the latest in this series of meetings designed to assist utilities in addressing problems with power plant performance and in identifying cost-effective solutions for achieving and maintaining heat rate improvement.

2007-03-30T23:59:59.000Z

325

Proceedings 2013 Heat Rate Improvement Conference  

Science Conference Proceedings (OSTI)

With the rising cost of fuel and the strong possibility of CO2 emissions regulations and limitations in the near future, utilities and power generation companies are focusing on power plant heat rate and performance. The 18th Heat Rate Improvement Conference is the latest in a series of meetings designed to assist attendees in addressing problems with power plant performance and identifying cost-effective solutions for achieving and sustaining heat rate ...

2013-04-05T23:59:59.000Z

326

DETERMINATION OF DEPOSITION RATES FOR COOKING ...  

Science Conference Proceedings (OSTI)

... All calculations of deposition rates were made after ... the in- duct electrostatic precipitator increased the ... (1985) measured the performance of several ...

2005-10-07T23:59:59.000Z

327

Utility Rate Discounts | Open Energy Information  

Open Energy Info (EERE)

Discounts Discounts Jump to: navigation, search A few electric utilities offer rate discounts to encourage residential energy efficiency. For homes that meet certain energy efficiency criteria, such as those established by the federal Energy Star program, the owner or tenant is awarded a percentage discount on each monthÂ’s electric bill. [1] Contents 1 Utility Rate Discount Incentives 2 References Utility Rate Discount Incentives CSV (rows 1 - 14) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Cleco Power - Power Miser New Home Program (Louisiana) Utility Rate Discount Louisiana Residential Building Insulation Central Air conditioners Clothes Washers Comprehensive Measures/Whole Building Doors Duct/Air sealing Furnaces Heat pumps

328

Rate Schedule PACI-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

or rate schedule accepted or approved by the Federal Energy Regulatory Commission (FERC) or other regulatory bodies will be passed on to each relevant customer. The FERC's or...

329

DEC Asset Rating | CUBIC APPLE LTD  

U.S. Energy Information Administration (EIA)

NON-DOMESTIC ENERGY ... if you are worried about the DEC asset rating for your public building why not get in contact with Cubic Apple on 01529 300 ...

330

Available Technologies: Super High Rate Sputter Deposition  

Andre’ Anders of Berkeley Lab has developed a very high deposition rate magnetron sputtering wherein the surface of a target and the race track zone area of the ...

331

Rate Schedule CV-EID4  

NLE Websites -- All DOE Office Websites (Extended Search)

CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011,...

332

Rate Schedule CV-SUR4  

NLE Websites -- All DOE Office Websites (Extended Search)

CV-SUR3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR SUPPLEMENTAL RESERVE SERVICE Effective: October 1, 2011,...

333

Rate Schedule CV-SPR4  

NLE Websites -- All DOE Office Websites (Extended Search)

CV-SPR3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR SPINNING RESERVE SERVICE Effective: October 1, 2011,...

334

Dose rate visualization of radioisotope thermoelectric generators  

DOE Green Energy (OSTI)

Advanced visualization techniques can be used to investigate gamma ray and neutron dose rates around complex dose rate intensive operations. A method has been developed where thousands of dose points are calculated using the MCNP(Monte Carlo N-Particle) computer code and then displayed to create color contour plots of the dose rate for complex geometries. Once these contour plots are created, they are sequenced together creating an animation to dynamically show how the dose rate changes with changes in the geometry or source over time.

Schwarz, R.A.; Kessler, S.F.; Tomaszewski, T.A.

1995-09-01T23:59:59.000Z

335

Rate Schedule CV-SPR4  

NLE Websites -- All DOE Office Websites (Extended Search)

Any charges or credits associated with the creation, termination, or modification to any tariff, contract, or rate schedule accepted or approved by the Federal Energy Regulatory...

336

Rate Schedule CV-SUR4  

NLE Websites -- All DOE Office Websites (Extended Search)

Any charges or credits associated with the creation, termination, or modification to any tariff, contract, or rate schedule accepted or approved by the Federal Energy Regulatory...

337

Corridor Rate Analysis Results - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Energy Information Administration 113 ... with the pipeline company tariff rates obtained using the Federal Energy Regulatory Commission Automated System for Tariff

338

Optimization Online - Approximate Primal Solutions and Rate ...  

E-Print Network (OSTI)

Mar 29, 2007... limit as the number of subgradient iterations increases to infinity). Furthermore, no convergence rate results are known for these algorithms.

339

Method of controlling fusion reaction rates  

DOE Patents (OSTI)

This invention relates to a method of controlling the reaction rates in a nuclear fusion reactor; and more particularly, to the use of polarized nuclear fuel.

Kulsrud, R.M.; Furth, H.P.; Valeo, E.J.; Goldhaber, M.

1983-05-09T23:59:59.000Z

340

Rate Schedule CV-TPT7  

NLE Websites -- All DOE Office Websites (Extended Search)

OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30,...

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Rate Schedule COTP-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

COTP-T3 (Supersedes Schedule COTP-T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CALIFORNIA-OREGON TRANSMISSION PROJECT SCHEDULE OF RATE FOR...

342

PEPTIDE FOLDING RATES FROM SINGLE-MOLECULE ...  

Science Conference Proceedings (OSTI)

... A. Myers, Daniel A. Gacek, Eric M. Peterson, Christopher B. Fox, Joel M ... These microscopic rates are used to estimate the free energy barrier to ...

343

Investigation of formaldehyde and acetaldehyde sampling rate...  

NLE Websites -- All DOE Office Websites (Extended Search)

formaldehyde and acetaldehyde sampling rate and ozone interference for passive deployment of Waters Sep-Pak XPoSure samplers Title Investigation of formaldehyde and acetaldehyde...

344

ORNL DAAC, global soil respiration rates  

NLE Websites -- All DOE Office Websites (Extended Search)

W. Raich and W. H. Schlesinger, the newly released data set contains soil respiration rates from sites in terrestrial and wetland ecosystems as reported in scientific literature...

345

Photovoltaic Degradation Rates -- An Analytical Review  

DOE Green Energy (OSTI)

As photovoltaic penetration of the power grid increases, accurate predictions of return on investment require accurate prediction of decreased power output over time. Degradation rates must be known in order to predict power delivery. This article reviews degradation rates of flat-plate terrestrial modules and systems reported in published literature from field testing throughout the last 40 years. Nearly 2000 degradation rates, measured on individual modules or entire systems, have been assembled from the literature, showing a median value of 0.5%/year. The review consists of three parts: a brief historical outline, an analytical summary of degradation rates, and a detailed bibliography partitioned by technology.

Jordan, D. C.; Kurtz, S. R.

2012-06-01T23:59:59.000Z

346

Rate Schedule CV-F13  

NLE Websites -- All DOE Office Websites (Extended Search)

FP customer allocation is equal to the annual PRR multiplied by the relevant FP percentage. The formula rate for FP power has three components. Component 1: FP Customer...

347

Definition: Facility Rating | Open Energy Information  

Open Energy Info (EERE)

any equipment comprising the facility.1 Related Terms reactive power, equipment rating, power, smart grid References Glossary of Terms Used in Reliability Standards An inl...

348

Building energy benchmarks and rating tools | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building energy benchmarks and rating tools Building energy benchmarks and rating tools Building energy benchmarks and rating tools Building energy benchmarks and rating tools More...

349

HEART RATE AS A MONITOR FOR METABOLIC RATE IN CAPTIVE JUVENILE STELLER SEA LIONS (EUMETOPIAS JUBATUS)  

E-Print Network (OSTI)

HEART RATE AS A MONITOR FOR METABOLIC RATE IN CAPTIVE JUVENILE STELLER SEA LIONS (EUMETOPIAS COLUMBIA 0Jan M. Mcl'hee, 2001 #12;ABSTRACT The potential use of heart rate to monitor energy expenditure a relationship exists between heart rate @I) and oxygen consumption ( ~ 0 ~ )in captive sea lions while swimming

350

University of California -Office of Loan Programs Historical STIP Quarterly Rate of Return for MOP Rate  

E-Print Network (OSTI)

University of California - Office of Loan Programs Historical STIP Quarterly Rate of Return for MOP - Office of Loan Programs Historical STIP Quarterly Rate of Return for MOP Rate Quarterly MOP Rate MOP.00% 03/31/86 7.987% 8.35% 8.35% (1) Calculated as the total STIP income earned for each period

Russell, Lynn

351

Richard Cantor Rating Transitions and Defaults Conditional on Watchlist, Outlook and Rating History Summary  

E-Print Network (OSTI)

This report documents global corporate credit rating transition and default rates during the 1995-2003 period conditional on the full information in Moody's published credit opinions, which, in addition to the current credit rating, include prior rating actions and current rating outlooks and reviews. The primary findings of this study are: • Moody’s rating system management practices attempt to limit rating reversals and dampen rating change volatility and, as a consequence, different issuers carrying the same rating may have different risks of rating migration and default. • As noted in Moody’s prior research dating back to 1993, recently downgraded issuers have a greater likelihood of future rating downgrades and default than do recently upgraded issuers. For example, obligors downgraded in the past twelve months are eight times more likely to be downgraded than upgraded in the next year. Downgraded issuers are eleven times more likely to default over one year than upgraded issuers. • Moody’s rating outlooks and reviews are used to signal the likely direction and timing of future rating actions and the evolution of default risk. For example, at a one-year time horizon, issuers with negative outlooks are seven times more likely to be downgraded than upgraded; issuers with positive outlooks are nearly twice as likely to be upgraded as downgraded; and issuers with stable outlooks have the highest probability of no rating change. Default rates within a given rating category also vary systematically by outlook status. For example,

unknown authors

2004-01-01T23:59:59.000Z

352

Video digest based on heart rate  

Science Conference Proceedings (OSTI)

In video digesting, not only features and keywords extracted from a content itself but viewer's input are essential to incorporate subjective impressions and perceived importance. The present study aims at providing heart rate based arousal level as ... Keywords: affect, emotion, heart rate, psychophysiology, video analysis, video digest

Satoshi Toyosawa; Takashi Kawai

2007-08-01T23:59:59.000Z

353

Switching rates of multi-step reactions  

E-Print Network (OSTI)

We consider a switching rate of a meta-stable reaction scheme, which includes reactions with arbitrary steps, e.g. $kA\\to(k+r)A$. Employing WKB approximation, controlled by a large system size, we evaluate both the exponent and the pre-exponential factor for the rate. The results are illustrated on a number of examples.

Escudero, Carlos

2008-01-01T23:59:59.000Z

354

Quasi-Dynamic Rating Pilot Projects  

Science Conference Proceedings (OSTI)

EPRI's DTCR technology, which encompasses a number of software tools, hardware tools, and methodologies, offers near-term solutions to overhead line rating problems. The Quasi-Dynamic Rating (QDR) concepts and tools developed in the 2004 pilot project are presented in this report.

2004-12-27T23:59:59.000Z

355

Method of controlling fusion reaction rates  

DOE Patents (OSTI)

A method of controlling the reaction rates of the fuel atoms in a fusion reactor comprises the step of polarizing the nuclei of the fuel atoms in a particular direction relative to the plasma confining magnetic field. Fusion reaction rates can be increased or decreased, and the direction of emission of the reaction products can be controlled, depending on the choice of polarization direction.

Kulsrud, Russell M. (Princeton, NJ); Furth, Harold P. (Princeton, NJ); Valeo, Ernest J. (Princeton Junction, NJ); Goldhaber, Maurice (Bayport, NY)

1988-01-01T23:59:59.000Z

356

Nuclear Reaction Rates and Carbon Star Formation  

E-Print Network (OSTI)

We have studied how the third dredge-up and the carbon star formation in low-mass Asymptotic Giant Branch stars depends on certain key nuclear reaction rates. We find from a set of complete stellar evolution calculations of a 2Msun model with Z=0.01 including mass loss, that varying either the N14(p,g)O15 or the 3-alpha reaction rate within their uncertainties as given in the NACRE compilation results in dredge-up and yields that differ by a factor of 2. Model tracks with a higher rate for the 3-alpha rate and a lower rate for the N14(p,g)O15 reaction both show more efficient third dredge-up. New experimental results for the N14(p,g)O15 reaction rates are surveyed, yielding a rate which is about 40% lower than the tabulated NACRE rate, and smaller than NACRE's lower limit. We discuss the possible implications of the revised nuclear reaction stellar evolution calculations that aim to reproduce the observed carbon star formation at low mass, which requires efficient third dredge-up.

Falk Herwig; Sam M. Austin

2004-08-21T23:59:59.000Z

357

Theoretical cosmic Type Ia supernova rates  

E-Print Network (OSTI)

The aim of this work is the computation of the cosmic Type Ia supernova rates at very high redshifts (z>2). We adopt various progenitor models in order to predict the number of explosions in different scenarios for galaxy formation and to check whether it is possible to select the best delay time distribution model, on the basis of the available observations of Type Ia supernovae. We also computed the Type Ia supernova rate in typical elliptical galaxies of different initial luminous masses and the total amount of iron produced by Type Ia supernovae in each case. It emerges that: it is not easy to select the best delay time distribution scenario from the observational data and this is because the cosmic star formation rate dominates over the distribution function of the delay times; the monolithic collapse scenario predicts an increasing trend of the SN Ia rate at high redshifts whereas the predicted rate in the hierarchical scheme drops dramatically at high redshift; for the elliptical galaxies we note that the predicted maximum of the Type Ia supernova rate depends on the initial galactic mass. The maximum occurs earlier (at about 0.3 Gyr) in the most massive ellipticals, as a consequence of downsizing in star formation. We find that different delay time distributions predict different relations between the Type Ia supernova rate per unit mass at the present time and the color of the parent galaxies and that bluer ellipticals present higher supernova Type Ia rates at the present time.

R. Valiante; F. Matteucci; S. Recchi; F. Calura

2008-07-15T23:59:59.000Z

358

Seedskadee Participating Project Power Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Sales Rate History Updated: 1022009 Rate Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) R4-F1 thru 474 3.000 1.275 6.000 UC-F1 4...

359

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Features > Groups Content Group Activity By term Q & A Feeds Content type Blog entry Discussion Document Event Poll Question Keywords Author Apply Ewilson FYI, OpenEI now accommodates t... Posted by: Ewilson 20 Sep 2013 - 11:58 99thin Very useful information. Thank... Posted by: 99thin 9 Sep 2013 - 00:19 Rmckeel The utility rate database version 1 API is now deprecated Posted by: Rmckeel 6 Sep 2013 - 14:00 There comes a time in every API version's lifecycle when it needs to be deprecated. OpenEI's utility rate database version 1 API has been in use since the inception of the database in 2010. As... Tags: API, Utility Rates NickL Glad I could help get you on t... Posted by: NickL 4 Sep 2013 - 07:41 Glad I could help get you on the right track Myles. There is not as simple

360

International Rates | OpenEI Community  

Open Energy Info (EERE)

International Rates International Rates Home > Groups > Utility Rate Nsbowde's picture Submitted by Nsbowde(12) Member 10 July, 2012 - 11:27 Per the town hall discussion yestereday, I have a link to a tariff database assembled by the Energy Regulators Regional Association. There is no free access and reproduction of the information without ERRA consent is prohibited, but nonetheless here it is. I have some friends in ERRA, so maybe future collaboration could be possible. http://www.erranet.org/Products/TariffDatabase Nick Groups: Utility Rate Login to post comments Nsbowde's blog Comments Rmckeel Rmckeel1 year 26 weeks ago International rates Thanks for the info, Nick! On a side note, when we move our blog over to OpenEI communities, content like this blog entry will be more visible on

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Utility Rate > Posts by term > Utility Rate Content Group Activity By term Q & A Feeds Term: American Clean Skies Foundation Type Term Title Author Replies Last Post sort icon Blog entry American Clean Skies Foundation Nominations open for $250,000 Multimedia Clean Energy prizes Graham7781 2 Oct 2012 - 13:01 Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis Rmckeel Sfomail Recent members: MSiira Apin101 Lissacoffey Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman

362

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Utility Rate > Posts by term > Utility Rate Content Group Activity By term Q & A Feeds Term: data Type Term Title Author Replies Last Post sort icon Blog entry data Commercial and Residential Hourly Load Data Now Available on OpenEI! Sfomail 17 May 2013 - 12:03 Blog entry data IRENA launches global atlas of renewable energy potential Graham7781 11 Feb 2013 - 15:18 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis

363

Definition: Equipment Rating | Open Energy Information  

Open Energy Info (EERE)

Rating Rating Jump to: navigation, search Dictionary.png Equipment Rating The maximum and minimum voltage, current, frequency, real and reactive power flows on individual equipment under steady state, short-circuit and transient conditions, as permitted or assigned by the equipment owner.[1] Also Known As Standard current ratings Related Terms reactive power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Rating&oldid=502535" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

364

OpenEI Community - Utility Rates  

Open Energy Info (EERE)

The utility rate The utility rate database version 1 API is now deprecated http://en.openei.org/community/blog/utility-rate-database-version-1-api-now-deprecated There comes a time in every API version's lifecycle when it needs to be deprecated.OpenEI's utility rate database version 1 API has been in use since the inception of the database in 2010.  As Illinois State University has taken a commanding lead of the project and its data curation, we have updated the schema and API to version 2 to present a richer spectrum of utility rate data.

365

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Utility Rate > Posts by term > Utility Rate Content Group Activity By term Q & A Feeds Term: challenge Type Term Title Author Replies Last Post sort icon Discussion challenge 2013 Civic Hacking Day Ideas Rmckeel 1 22 May 2013 - 08:23 Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis Rmckeel Sfomail Recent members: MSiira Apin101 Lissacoffey Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne

366

Method for Determining Solids Circulation Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

Determining Solids Circulation Rate Determining Solids Circulation Rate Contact NETL Technology Transfer Group techtransfer@netl.doe.gov May 2012 Opportunity Research is currently active on the patented technology "Method for Determining Solids Circulation Rate." The technology is available for licensing and/or further collaborative research from the U.S. Department of Energy's National Energy Technology Laboratory. Overview This invention provides a method to measure the rate of solids circulation, particularly in those applications where the solids are recycled back to pro- cesses for further use. The applications include processes such as circulating fluidized bed gasifiers and combustors, as well as chemical looping. In the above applications, determining solids circulation rates is needed to

367

gas rates | OpenEI Community  

Open Energy Info (EERE)

gas rates gas rates Home > Groups > Utility Rate Are there Gas Utility Rates available in OpenEI? Submitted by Nlong on 11 July, 2012 - 11:41 1 answer Points: 1 Hi, OpenEI doesn't have NG utility rates as far as I'm aware. That may be a dataset that is added in the future. You can access natural gas prices by utility and sector by downloading the EIA-176 form from the Energy Information Administration. I've included some links to help you find your way. http://205.254.135.7/survey/form/eia_176/efs176.cfm http://www.eia.gov/oil_gas/natural_gas/applications/eia176query_historical.html -Sfomail Sfomail on 12 July, 2012 - 12:04 Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge?

368

Atomic multipole relaxation rates near surfaces  

E-Print Network (OSTI)

The spontaneous relaxation rates for an atom in free space and close to an absorbing surface are calculated to various orders of the electromagnetic multipole expansion. The spontaneous decay rates for dipole, quadrupole and octupole transitions are calculated in terms of their respective primitive electric multipole moments and the magnetic relaxation rate is calculated for the dipole and quadrupole transitions in terms of their respective primitive magnetic multipole moments. The theory of electromagnetic field quantization in magnetoelectric materials is used to derive general expressions for the decay rates in terms of the dyadic Green function. We focus on the decay rates in free space and near an infinite half space. For the decay of atoms near to an absorbing dielectric surface we find a hierarchy of scaling laws depending on the atom-surface distance z.

Crosse, J A

2009-01-01T23:59:59.000Z

369

Atomic multipole relaxation rates near surfaces  

E-Print Network (OSTI)

The spontaneous relaxation rates for an atom in free space and close to an absorbing surface are calculated to various orders of the electromagnetic multipole expansion. The spontaneous decay rates for dipole, quadrupole and octupole transitions are calculated in terms of their respective primitive electric multipole moments and the magnetic relaxation rate is calculated for the dipole and quadrupole transitions in terms of their respective primitive magnetic multipole moments. The theory of electromagnetic field quantization in magnetoelectric materials is used to derive general expressions for the decay rates in terms of the dyadic Green function. We focus on the decay rates in free space and near an infinite half space. For the decay of atoms near to an absorbing dielectric surface we find a hierarchy of scaling laws depending on the atom-surface distance z.

J. A. Crosse; Stefan Scheel

2009-01-20T23:59:59.000Z

370

Chaos regularization of quantum tunneling rates  

Science Conference Proceedings (OSTI)

Quantum tunneling rates through a barrier separating two-dimensional, symmetric, double-well potentials are shown to depend on the classical dynamics of the billiard trajectories in each well and, hence, on the shape of the wells. For shapes that lead to regular (integrable) classical dynamics the tunneling rates fluctuate greatly with eigenenergies of the states sometimes by over two orders of magnitude. Contrarily, shapes that lead to completely chaotic trajectories lead to tunneling rates whose fluctuations are greatly reduced, a phenomenon we call regularization of tunneling rates. We show that a random-plane-wave theory of tunneling accounts for the mean tunneling rates and the small fluctuation variances for the chaotic systems.

Pecora, Louis M.; Wu Dongho [Materials Physics and Sensors, US Naval Research Laboratory, Washington, DC 20375 (United States); Lee, Hoshik [Department of Physics, College of William and Mary, Williamsburg, Virginia 23187 (United States); Antonsen, Thomas; Lee, Ming-Jer; Ott, Edward [Physics and Electrical Engineering Departments, University of Maryland, College Park, Maryland 20742 (United States)

2011-06-15T23:59:59.000Z

371

Home Energy Ratings and Building Performance  

E-Print Network (OSTI)

This paper provides an overview of the Home Energy Rating System (HERS). A short summary of the origination and history of the HERS system will lead to a more detailed description of the inspection and testing protocol. The HERS rating provides an accepted method to determine home efficiency based on standards developed and overseen by the Residential Energy Services Network (RESNET), a not-for-profit corporation. The paper will discuss the effect of various building systems and effects of local climate as they affect the rating score of a proposed or completed structure. The rating is used to determine the most cost effective mechanical systems, building envelope design including window and door types, effect of various roofing materials and radiant barriers. The paper will conclude by comparing specifics of an actual report to the construction characteristics of a home as they relate to the HERS Rating and the result.

Gardner, J.C.

2008-12-01T23:59:59.000Z

372

Merger Rates of Dark-Matter Haloes  

E-Print Network (OSTI)

We derive analytic merger rates for dark-matter haloes within the framework of the Extended Press-Schechter (EPS) formalism. These rates become self-consistent within EPS once we realize that the typical merger in the limit of a small time-step involves more than two progenitors, contrary to the assumption of binary mergers adopted in earlier studies. We present a general method for computing merger rates that span the range of solutions permitted by the EPS conditional mass function, and focus on a specific solution that attempts to match the merger rates in N-body simulations. The corrected EPS merger rates are more accurate than the earlier estimates of Lacey & Cole, by ~20% for major mergers and by up to a factor of ~3 for minor mergers of mass ratio 1:10^4. Based on the revised merger rates, we provide a new algorithm for constructing Monte-Carlo EPS merger trees, that could be useful in Semi-Analytic Modeling. We provide analytic expressions and plot numerical results for several quantities that are very useful in studies of galaxy formation. This includes (a) the rate of mergers of a given mass ratio per given final halo, (b) the fraction of mass added by mergers to a halo, and (c) the rate of mergers per given main progenitor. The creation and destruction rates of haloes serve for a self-consistency check. Our method for computing merger rates can be applied to conditional mass functions beyond EPS, such as those obtained by the ellipsoidal collapse model or extracted from $N$-body simulations.

Eyal Neistein; Avishai Dekel

2008-02-04T23:59:59.000Z

373

On the Effectiveness of Rate Limiting Mechanisms  

E-Print Network (OSTI)

One class of worm defense techniques that received attention of late is to “rate limit ” outbound traffic to contain fast spreading worms. Several proposals of rate limiting techniques have appeared in the literature, each with a different take on the impetus behind rate limiting. This paper presents an empirical analysis on different rate limiting schemes using real traffic and attack traces from a sizable network. In the analysis we isolate and investigate the impact of the critical parameters for each scheme and seek to understand how these parameters might be set in realistic network settings. Analysis shows that using DNS-based rate limiting has substantially lower error rates than schemes based on other traffic statistics. The empirical analysis additionally brings to light a number of issues with respect to rate limiting in practice. We explore the impact of these issues in the context of general worm containment. Acknowledgments: We thank the members and companies of the PDL Consortium for their support. This work was partially supported by the National Science Foundation under Grant No. CNS-0433540 and ANI-0326472.

Cynthia Wong; Stan Bielski; Ahren Studer; Chenxi Wang

2005-01-01T23:59:59.000Z

374

What Is the New Normal Unemployment Rate?  

E-Print Network (OSTI)

Recent labor markets developments, including mismatches in the skills of workers and jobs, extended unemployment benefits, and very high rates of long-term joblessness, may be impeding the return to “normal ” unemployment rates of around 5%. An examination of alternative measures of labor market conditions suggests that the “normal ” unemployment rate may have risen as much as 1.7 percentage points to about 6.7%, although much of this increase is likely to prove temporary. Even with such an increase, sizable labor market slack is expected to persist for years. In the past, the U.S. labor market has proven to be very flexible and recessions have not usually been followed by long-lasting increases in the unemployment rate. But, in the wake of the most recent recession, many economists are concerned that developments such as mismatches in the skills of workers and jobs, extended unemployment benefits, and a rise in long-term joblessness may have raised the “normal ” or “natural ” rate of unemployment above the 5 % level that was thought to be typical before the downturn. Indeed, a few economists have gone so far as to argue that the rise in the unemployment rate to its current level of 9 % primarily reflects an increase in the natural rate, implying there is little slack in labor markets and therefore little downward pressure on inflation. This Economic Letter

Weidner; John C. Williams

2011-01-01T23:59:59.000Z

375

Rate Schedule CV-RFS4  

NLE Websites -- All DOE Office Websites (Extended Search)

RFS4 RFS4 (Supersedes Schedule CV-RFS3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR REGULATION AND FREQUENCY RESPONSE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Regulation and Frequency Response Service (regulation). Character and Conditions of Service: Regulation is necessary to provide for the continuous balancing of resources and interchange with load and for maintaining scheduled interconnection frequency at 60-cycles per second. Formula Rate: The formula rate for regulation includes three components:

376

Considerations for How to Rate CPV  

DOE Green Energy (OSTI)

The concentrator photovoltaic (CPV) industry is introducing multiple products into the marketplace, but, as yet, the; community has not embraced a unified method for assessing a nameplate rating. The choices of whether to use 850,; 900, or 1000 W/m2 for the direct-normal irradiance and whether to link the rating to ambient or cell temperature will; affect how CPV modules are rated and compared with other technologies. This paper explores the qualitative and; quantitative ramifications of these choices using data from two multi-junction CPV modules and two flat-plate; modules.

Kurtz, S.; Miller, M.; Marion, B.; Emery, K.; McConnell, R.; Surendran, S.; Kimber, A.

2011-02-01T23:59:59.000Z

377

Measuring Degradation Rates Without Irradiance Data  

DOE Green Energy (OSTI)

A method to report PV system degradation rates without using irradiance data is demonstrated. First, a set of relative degradation rates are determined by comparing daily AC final yields from a group of PV systems relative to the average final yield of all the PV systems. Then, the difference between relative and absolute degradation rates is found from a statistical analysis. This approach is verified by comparing to methods that utilize irradiance data. This approach is significant because PV systems are often deployed without irradiance sensors, so the analysis method described here may enable measurements of degradation using data that were previously thought to be unsuitable for degradation studies.

Pulver, S.; Cormode, D.; Cronin, A.; Jordan, D.; Kurtz, S.; Smith, R.

2011-02-01T23:59:59.000Z

378

NETL: Carbon Storage - Monitoring, Verification, and Accounting...  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Carbon Storage Monitoring, Verification, and Accounting (MVA) Focus Area An MVA program is designed to confirm permanent storage of carbon dioxide (CO2) in geologic formations...

379

Data Fusion for Improved Respiration Rate Estimation  

E-Print Network (OSTI)

We present an application of a modified Kalman-Filter (KF) framework for data fusion to the estimation of respiratory rate from multiple physiological sources which is robust to background noise. A novel index of the ...

Nemati, Shamim

380

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Home > Utility Rate > Posts by term > Utility Rate Content Group Activity By term Q & A Feeds Term: energy efficiency Type Term Title Author Replies Last Post sort icon Blog entry energy efficiency FOA aimed at growing expansive database of Renewable Energy and Energy Efficiency Incentives and Policies Graham7781 12 Dec 2012 - 11:30 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Utility Rate Discount | Open Energy Information  

Open Energy Info (EERE)

Discount Discount Jump to: navigation, search A few electric utilities offer rate discounts to encourage residential energy efficiency. For homes that meet certain energy efficiency criteria, such as those established by the federal Energy Star program, the owner or tenant is awarded a percentage discount on each monthÂ’s electric bill. [1] Utility Rate Discount Incentives CSV (rows 1 - 14) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Cleco Power - Power Miser New Home Program (Louisiana) Utility Rate Discount Louisiana Residential Building Insulation Central Air conditioners Clothes Washers Comprehensive Measures/Whole Building Doors Duct/Air sealing Furnaces Heat pumps Water Heaters Windows Yes Dominion North Carolina Power - Energy Saver Home Plus (North Carolina) Utility Rate Discount North Carolina Residential Water Heaters

382

Commercial Building Energy Asset Rating Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BUILDING BUILDING ENERGY ASSET RATING WORKSHOP December 8-9, 2011 Washington, D.C. Nora Wang (Pacific Northwest National Laboratory) Will Gorrissen (Pacific Northwest National Laboratory) Molly McCabe (Hayden Tanner, LLC) Cody Taylor (Department of Energy) 1 I Asset Rating D.C. Workshop eere.energy.gov PRE-DECISIONAL Information included in this document is for discussion purposes and does not constitute the final program design. FOR INFORMATION ONLY 2 I Asset Rating D.C. Workshop eere.energy.gov Program Goals * Facilitate cost-effective investment in energy efficiency and reduce energy use in the commercial building sector * Establish a national standard for voluntary commercial building asset rating * Create a tool to help building owners identify and implement

383

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Utility Rate > Posts by term Content Group Activity By term Q & A Feeds American Clean Skies Foundation (1) API (3) Apps (1) bug (1) building load (1) building load data (1) challenge (1) clean energy (1) commercial load (1) data (2) dataset (1) datasets (1) developer (5) DOE (1) EIA (1) electric load data (1) energy efficiency (1) Energy Visions Prize (1) EZFeed (1) FOA (1) funding (1) Global Atlas (1) hackathon (1) Illinois State University (1) Incentives and Policies (1) 1 2 3 next › last » Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated

384

On-site Housing Rates | Staff Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Rates Effective February 1, 2013 Rates for Occupancy < 30-Days Guest House* Single/Double: US $105.00/day Housekeeping service is provided on all working days. *Alternatives to the Guest House - When family-type accommodations are assigned to temporary or transient personnel, Guest House rates as set forth above will apply. The total will not exceed one months' rent for a unit occupied for 30 days or less. When such assignment is necessary due to lack of adequate Guest House accommodations, housekeeping service is provided on working days; for reservations staying seven days or less. Residence Houses Curie House: US $42.00/day Cavendish House: US $42.00/day Compton House: US $42.00/day Housekeeping service for all residence houses are provided three times per

385

Definition: Rated power | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Rated power Jump to: navigation, search Dictionary.png Rated power The power output of a device under specific or nominal operating conditions[1] View on Wikipedia Wikipedia Definition In electrical and electronic engineering, the power rating of a device is a guideline set by the manufacturer as a maximum power to be used with that device. This limit is usually set somewhat lower than the level where the device will be damaged, to allow a margin of safety. In devices which primarily dissipate electric power or convert it into mechanical power, such as resistors, electric motors, and speakers, the power rating given is usually the maximum power that can be safely dissipated by the

386

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Groups > Groups > Utility Rate Content Group Activity By term Q & A Feeds There are no feeds from external sites for this group. Groups Menu You must login in order to post into this group. Groups Menu You must login in order to post into this group. Group members (28) Managers: Dloomis Rmckeel Sfomail Recent members: MSiira Apin101 Lissacoffey Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis Rmckeel Sfomail

387

NREL: Photovoltaics Research - Photovoltaic Energy Ratings Methods  

NLE Websites -- All DOE Office Websites (Extended Search)

Photovoltaic Energy Ratings Methods Validation Photovoltaic Energy Ratings Methods Validation The Photovoltaic (PV) Engineering group at NREL validates energy ratings methods by standards committees to establish an energy rating methodology. We are evaluating techniques to account for the impact on PV performance from variations in the spectral distribution of solar radiation. Two types of methods were evaluated for correcting the short-circuit current of PV modules for variations in the solar spectrum under clear skies: (1) empirical relationships based on air mass, and (2) use of spectral irradiance models and PV module spectral response data. Methods of the first type were the Sandia National Laboratories absolute air-mass function, or f(AMa), and the CREST air-mass function, or f(AM). The second

388

Historical river flow rates for dose calculations  

Science Conference Proceedings (OSTI)

Annual average river flow rates are required input to the LADTAP Computer Code for calculating offsite doses from liquid releases of radioactive materials to the Savannah River. The source of information on annual river flow rates used in dose calculations varies, depending on whether calculations are for retrospective releases or prospective releases. Examples of these types of releases are: Retrospective - releases from routine operations (annual environmental reports) and short term release incidents that have occurred. Prospective - releases that might be expected in the future from routine or abnormal operation of existing or new facilities (EIS`s, EID`S, SAR`S, etc.). This memorandum provides historical flow rates at the downstream gauging station at Highway 301 for use in retrospective dose calculations and derives flow rate data for the Beaufort-Jasper and Port Wentworth water treatment plants.

Carlton, W.H.

1991-06-10T23:59:59.000Z

389

Essays on exchange rates and electricity demand  

E-Print Network (OSTI)

This thesis examines two important issues in economic development: exchange rates and electricity demand and addresses methodological issues of using time series and panel data analysis to investigate important policy ...

Li, Xiangming, 1966-

1999-01-01T23:59:59.000Z

390

Can Anthropogenic Aerosols Decrease the Snowfall Rate?  

Science Conference Proceedings (OSTI)

Observations by Borys, Lowenthal, Cohn, and Brown in midlatitude orographic clouds show that for a given supercooled liquid water content, both the riming and the snowfall rates are smaller if the supercooled cloud has more cloud droplets as, for ...

U. Lohmann

2004-10-01T23:59:59.000Z

391

Rating the energy performance of buildings  

SciTech Connect

In order to succeed in developing a more sustainable society, buildings will need to be continuously improved. This paper discusses how to rate the energy performance of buildings. A brief review of recent approaches to energy rating is presented. It illustrates that there is no single correct or wrong concept, but one needs to be aware of the relative impact of the strategies. Different strategies of setting energy efficiency standards are discussed and the advantages of the minimum life cycle cost are shown. Indicators for building energy rating based on simulations, aggregated statistics and expert knowledge are discussed and illustrated in order to demonstrate strengths and weaknesses of each approach. In addition, the importance of considering the level of amenities offered is presented. Attributes of a rating procedure based on three elements, flexible enough for recognizing different strategies to achieve energy conservation, is proposed.

Olofsson, Thomas; Meier, Alan; Lamberts, Roberto

2004-12-01T23:59:59.000Z

392

The legal case against standby rates  

Science Conference Proceedings (OSTI)

Under rates approved by many state commissions, on-site investments are blocked and/or dis-incentivized by policies that place the interest of utility shareholders before the interests of the public. (author)

Casten, Sean; Karegianes, Myra

2007-11-15T23:59:59.000Z

393

The Estimation of Snowfall Rate Using Visibility  

Science Conference Proceedings (OSTI)

The relationship between liquid equivalent snowfall rate and visibility is investigated using data collected at the National Center for Atmospheric Research Marshall Snowfall Test Site during two winter field seasons and using theoretical ...

Roy M. Rasmussen; Jothiram Vivekanandan; Jeffrey Cole; Barry Myers; Charles Masters

1999-10-01T23:59:59.000Z

394

Empirically Evaluating Divergence Rates of Atmospheric Trajectories  

Science Conference Proceedings (OSTI)

Observed Northern Hemisphere divergence rates of phase-space trajectories initially emanating from neighboring points are estimated, using a simple, seasonal, weakly GCM-dependent linear method applied to Ertel potential vorticity on the 315-K ...

Gidon Eshel

2006-02-01T23:59:59.000Z

395

Can Paleoceanographic Tracers Constrain Meridional Circulation Rates?  

Science Conference Proceedings (OSTI)

The ability of paleoceanographic tracers to constrain rates of transport is examined using an inverse method to combine idealized observations with a geostrophic model. Considered are the spatial distribution, accuracy, and types of tracers ...

Peter Huybers; Geoffrey Gebbie; Olivier Marchal

2007-02-01T23:59:59.000Z

396

Rating of Solar Energy Devices (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

The Public Utility Commission has regulatory authority over solar energy devices installed and used in the state of Texas. The Commission can choose to adopt standards pertaining to the rating of...

397

Calibration and Rating of Photovoltaics: Preprint  

SciTech Connect

Rating the performance of photovoltaic (PV) modules is critical to determining the cost per watt, and efficiency is useful to assess the relative progress among PV concepts. Procedures for determining the efficiency for PV technologies from 1-sun to low concentration to high concentration are discussed. We also discuss the state of the art in primary and secondary calibration of PV reference cells used by calibration laboratories around the world. Finally, we consider challenges to rating PV technologies and areas for improvement.

Emery, K.

2012-06-01T23:59:59.000Z

398

DWPF Macrobatch 2 Melt Rate Tests  

SciTech Connect

The Defense Waste Processing Facility (DWPF) canister production rate must be increased to meet canister production goals. Although a number of factors exist that could potentially increase melt rate, this study focused on two: (1) changes in frit composition and (2) changes to the feed preparation process to alter the redox of the melter feed. These two factors were investigated for Macrobatch 2 (sludge batch 1B) utilizing crucible studies and a specially designed ''melt rate'' furnace. Other potential factors that could increase melt rate include: mechanical mixing via stirring or the use of bubblers, changing the power skewing to redistribute the power input to the melter, and elimination of heat loss (e.g. air in leakage). The melt rate testing in FY00 demonstrated that melt rate can be improved by adding a different frit or producing a much more reducing glass by the addition of sugar as a reductant. The frit that melted the fastest in the melt rate testing was Frit 165. A paper stud y was performed using the Product Composition Control System (PCCS) to determine the impact on predicted glass viscosity, liquidus, durability, and operating window if the frit was changed from Frit 200 to Frit 165. PCCS indicated that the window was very similar for both frits. In addition, the predicted viscosity of the frit 165 glass was 46 poise versus 84 poise for the Frit 200 glass. As a result, a change from Frit 200 to Frit 165 is expected to increase the melt rate in DWPF without decreasing waste loading.

Stone, M.E.

2001-01-03T23:59:59.000Z

399

Changes in heart rate variability during fainting  

Science Conference Proceedings (OSTI)

Studies of heart rate variability in people who faint may yield insights into normal physiologic mechanisms which probably are dynamic. These insights might be gained because fainting appears to be due to a breakdown of these mechanisms. Tilt table testing reliably induces fainting in patients with a history of fainting and can be used to study these mechanisms. During tilt tests ending in fainting heart rate changes markedly

Robert Sheldon; Kenneth Riff

1991-01-01T23:59:59.000Z

400

Radiation Leukemogenesis at Low Dose Rates  

SciTech Connect

The major goals of this program were to study the efficacy of low dose rate radiation exposures for the induction of acute myeloid leukemia (AML) and to characterize the leukemias that are caused by radiation exposures at low dose rate. An irradiator facility was designed and constructed that allows large numbers of mice to be irradiated at low dose rates for protracted periods (up to their life span). To the best of our knowledge this facility is unique in the US and it was subsequently used to study radioprotectors being developed for radiological defense (PLoS One. 7(3), e33044, 2012) and is currently being used to study the role of genetic background in susceptibility to radiation-induced lung cancer. One result of the irradiation was expected; low dose rate exposures are ineffective in inducing AML. However, another result was completely unexpected; the irradiated mice had a very high incidence of hepatocellular carcinoma (HCC), approximately 50%. It was unexpected because acute exposures are ineffective in increasing HCC incidence above background. This is a potential important finding for setting exposure limits because it supports the concept of an ?inverse dose rate effect? for some tumor types. That is, for the development of some tumor types low dose rate exposures carry greater risks than acute exposures.

Weil, Michael; Ullrich, Robert

2013-09-25T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Short GRBs: Rates and luminosity function implications  

E-Print Network (OSTI)

We compare the luminosity function and rate inferred from the BATSE short hard bursts (SHBs) peak flux distribution with the redshift and luminosity distributions of SHBs observed by Swift/HETE II. The Swift/HETE II SHB sample is incompatible with SHB population that follows the star formation rate. However, it is compatible with a distribution of delay times after the SFR. This would be the case if SHBs are associated with the mergers of double neutron star (DNS) systems. DNS may be ``primordial'' or can form dynamically by binary exchange interaction in globular clusters during core collapse. The implied SHB rates that we find range from \\sim 8 to \\sim 30h_(70)^3 Gpc^(-3)yr^(-1). This rate is a much higher than what was previously estimated and, when beaming is taken into account, it is comparable to the rate of neutron star mergers estimated from statistics of binary pulsars. If GRBs are produced in mergers the implied rate practically guarantees detection by LIGO II and possibly even by LIGO I.

Dafne Guetta

2006-10-13T23:59:59.000Z

402

FIRST 100 T NON-DESTRUCTIVE MAGNET  

DOE Green Energy (OSTI)

The first 100 T non-destructive (100 T ND) magnet and power supplies as currently designed are described. This magnet will be installed as part of the user facility research equipment at the National High Magnetic Field Laboratory (NHMFL) Pulsed Field Facility at Los Alamos National Laboratory. The 100 T ND magnet will provide a 100 T pulsed field of 5 ms duration (above 90% of full field) in a 15 mm diameter bore once per hour. Magnet operation will be non-destructive. The magnet will consist of a controlled power outer coil set which produces a 47 T platform field in a 225 mm diameter bore. Located within the outer coil set will be a 220 mm outer diameter capacitor powered insert coil. Using inertial energy storage a synchronous motor/generator will provide ac power to a set of seven ac-dc converters rated at 64 MW/80 MVA each. These converters will energize three independent coil circuits to create 170 MJ of field energy in the outer coil set at the platform field of 47 T. The insert will then be energized to produce the balance of the 100 T peak field using a 2.3 MJ, 18 kV (charged to 15 kV), 14.4 mF capacitor bank controlled with solid-state switches. The magnet will be the first of its kind and the first non-destructive, reusable 100 T pulsed magnet. The operation of the magnet will be described along with special features of its design and construction.

J. R. SIMS; ET AL

1999-10-01T23:59:59.000Z

403

Achievable Rate and Optimal Physical Layer Rate Allocation in Interference-Free Wireless Networks  

E-Print Network (OSTI)

We analyze the achievable rate in interference-free wireless networks with physical layer fading channels and orthogonal multiple access. As a starting point, the point-to-point channel is considered. We find the optimal physical and network layer rate trade-off which maximizes the achievable overall rate for both a fixed rate transmission scheme and an improved scheme based on multiple virtual users and superposition coding. These initial results are extended to the network setting, where, based on a cut-set formulation, the achievable rate at each node and its upper bound are derived. We propose a distributed optimization algorithm which allows to jointly determine the maximum achievable rate, the optimal physical layer rates on each network link, and an opportunistic back-pressure-type routing strategy on the network layer. This inherently justifies the layered architecture in existing wireless networks. Finally, we show that the proposed layered optimization approach can achieve almost all of the ergodic ...

Cui, Tao; Kliewer, Joerg

2009-01-01T23:59:59.000Z

404

Estimating stress heterogeneity from aftershock rate  

E-Print Network (OSTI)

We estimate the rate of aftershocks triggered by a heterogeneous stress change, using the rate-and-state model of Dieterich [1994]. We show than an exponential stress distribution P(\\tau)~ exp(-\\tau/\\tau_0) gives an Omori law decay of aftershocks with time ~1/t^p, with an exponent p=1-A\\sigma_n/\\tau_0, where A is a parameter of the rate-and-state friction law, and \\sigma_n the normal stress. Omori exponent p thus decreases if the stress "heterogeneity" \\tau_0 decreases. We also invert the stress distribution P(\\tau) from the seismicity rate R(t), assuming that the stress does not change with time. We apply this method to a synthetic stress map, using the (modified) scale invariant "k^2" slip model [Herrero and Bernard, 1994]. We generate synthetic aftershock catalogs from this stress change. The seismicity rate on the rupture area shows a huge increase at short times, even if the stress decreases on average. This stochastic slip model gives a Gaussian stress distribution, but nevertheless produces an aftersho...

Helmstetter, A; Helmstetter, Agnes; Shaw, Bruce E.

2005-01-01T23:59:59.000Z

405

Sodium tetraphenylborate solubility and dissolution rates  

DOE Green Energy (OSTI)

The rate of solid sodium tetraphenylborate (NaTPB) dissolution in In-Tank Precipitation salt solutions has been experimentally determined. The data indicates that the dissolution rate of solid NaTPB is a minor contributor the lag time experienced in the 1983 Salt Decontamination Demonstration Test and should not be considered as the rate determining step. Current analytical models for predicting the time to reach the composite lower flammability limit assume that the lag time is not more than 6 hours, and the data supports this assumption (i.e., dissolution by itself requires much less than 6 hours). The data suggests that another step--such as mass transport, the reaction of a benzene precursor or the mixing behavior--is the rate determining factor for benzene release to the vapor space in Tank 48H. In addition, preliminary results from this program show that the degree of agitation employed is not a significant parameter in determining the rate of NaTPB dissolution. As a result of this study, an improved equation for predicting equilibrium tetraphenylborate solubility with respect to temperature and sodium ion concentration has been determined.

Barnes, M.J.; Peterson, R.A.; Swingle, R.F.; Reeves, C.T.

1995-12-31T23:59:59.000Z

406

Resource supply shocks and the interest rate  

SciTech Connect

Using a model of optimal economic growth with exhaustible resources, the author focuses on a real shock as an essential element of a model of ecomomic fluctuations that contributes substantially to variations in the interest rate, and output. When there occurs a sudden negative resource supply shock, the rate of extraction of the resource declines. Along the optimal path with capital stock fixed in the short run, the output-capital ratio and the real interest rate fall instantaneously. The hypothesis is tested with the quarterly US data using estimation techniques of Vector Autoregressions (VARs). Included are five variables in the VAR model: crude oil price, price level, interest rate, industrial production, and copper price. The general vector autoregressive models are estimated with a prior distribution imposed on the parameters of the model. The period of fit is 1958 to 1983. Impulse response functions of the system and historical decompositions of the time series are investigated. Empirical studies support the derived working hypothesis that real interest rate falls instantaneously and then slowly recovers in the long run when there occurs a negative resource supply shock.

Kang, M.S.

1984-01-01T23:59:59.000Z

407

Intraclass Price Elasticity & Electric Rate Design  

E-Print Network (OSTI)

Electric rate design relies on cost incurrance for pricing and pricing structures. However, as utilities move into a marketing mode, rate design needs to respond more to customer reactions to pricing changes. Intraclass price elasticities aid rate designers by estimating customer behavior to change. Intraclass price elasticities vary with customer usage. The more energy used by a customer, the greater the amount of elasticity. For an industrial customer, this means that all energy consumed up to the amount necessary for base operations is relatively inelastic. All energy consumption beyond this becomes more elastic as usage increases. In the book "Innovative Electric Rates," John Chamberlin and Charles Dickson utilize an economic model to test conservation programs. This model utilizes intraclass price elasticities and has a direct use in current electric rate design. The model is a strong indicator of how best a company's electric prices and pricing structures manage demand-side growth, increase energy sales consumption, and aide in non-discriminatory economic development.

Gresham, K. E.

1987-09-01T23:59:59.000Z

408

Discount rates and demand-side management  

SciTech Connect

The standard economic analysis of of implied discount rates for energy-efficiency investment is wrong. First, consumers are not profit maximizing or economic optimizing agents with respect to energy. To the extent consumers make tradeoffs on some criteria other than energy costs, implied discount rates measure that other tradeoff, not the energy cost tradeoff. Second, to the extent that product pricing does not reflect tradeoffs between first cost and energy cost, there is no meaning to implied market discount rates based on these factors. Related to this misinterpretation of consumer and market discount rates is the issue of consumer and utility self-interest. To the extent that utilities can capitalize on the energy-inefficient investment behavior of individuals through DSM programs, it is in their interest and the ratepayer's interest to do so. Considerable evidence suggests that implied discount rates convey extremely misleading information about the level of this underinvestment. Drawing inferences about the value of DSM programs from this information is similarly misleading. An economic explanation of consumer and marker behavior suggests that such underinvestment is both rational and common and that large gains may be achieved through DSM. Societal welfare would be improved if utilities aggressively capitalized on the widespread consumer underinvestment in energy efficiency by incorporating DSM in their resource planning processes.

Chernoff, H.

1993-02-01T23:59:59.000Z

409

Labor Market Frictions, Interest Rates, and Macroeconomic Policies  

E-Print Network (OSTI)

endogenous separation rate increases, that is the ?ow intoinduces higher real interest rate, increases the demand forendogenous separation rate increases. We assume match-speci?

Zhang, Ji

410

Relating Vehicle-Wildlife Crash Rates to Roadway Improvements  

E-Print Network (OSTI)

animal-vehicle crash rates experienced increases followingif the crash rates has a significant increase or decrease inshowed an increase in animal-vehicle crash rates, although

Young, Rhonda; Giessen, Steven Vander; Vokurka, Christopher Steven

2007-01-01T23:59:59.000Z

411

Transmission Rate in Partial Differential Equation in Epidemic Models.  

E-Print Network (OSTI)

??The rate at which susceptible individuals become infected is called the transmission rate. It is important to know this rate in order to study the… (more)

Elkadry, Alaa

2013-01-01T23:59:59.000Z

412

Size structuring of planktonic communities : biological rates and ecosystem dynamics  

E-Print Network (OSTI)

measuring growth and mortality rates among Prochlorococcustemperature on metabolic rate. Science 293:2248-2251. Gregg,and temperature on metabolic rate. Science. 293:2248-2251.

Taniguchi, Darcy Anne Akiko

2013-01-01T23:59:59.000Z

413

Sustainability, Limited Substitutability and Non-Constant Social Discount Rates  

E-Print Network (OSTI)

and Non-constant Social Discount Rates ? int strict weaktal preservation, and the rate of discount’, Quarterlyhorizon and the discount rate’, Journal of Economic Theory

Traeger, Christian P.

2008-01-01T23:59:59.000Z

414

Freely Floating Exchange Rates Do Not Systematically Overshoot  

E-Print Network (OSTI)

Canadian-U.S. exchange rate, Review of Financial Economics,economy under flexible exchange rates, Journal of Monetary1976, Expectations and Exchange Rate Dynamics, Journal of

Pippenger, John

2008-01-01T23:59:59.000Z

415

Globalization, Macroeconomic Performance, and the Exchange Rates of Emerging Economies  

E-Print Network (OSTI)

The Impact of Exchange Rate Movements on U.S. Foreign Debt."Performance, and the Exchange Rates of Emerging Economies*volatility, exchange-rate regimes, institutions,

Obstfeld, Maurice

2004-01-01T23:59:59.000Z

416

After the Fall: East Asian Exchange Rates Since the Crisis  

E-Print Network (OSTI)

Case for Floating Exchange Rates in Asia. ” In Monetary and2005. “Classifying Exchange Rate Regimes: Deeds vs. Words. ”Ronald I. 2005. Exchange Rates under the East Asian Dollar

Cohen, Benjamin J

2007-01-01T23:59:59.000Z

417

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Groups Content Group Activity By term Q & A Feeds Share your own status updates, and follow the updates & activities of others by creating your own account. Or, remember to log in If you already have an account. Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis Rmckeel Sfomail Recent members: MSiira Apin101 Lissacoffey Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng 429 Throttled (bot load)

418

Intramolecular ET Rates in Modified Ferrocytochromes c  

NLE Websites -- All DOE Office Websites (Extended Search)

Intramolecular Electron-Transfer Rates on Driving Force, pH, Intramolecular Electron-Transfer Rates on Driving Force, pH, and Temperature in Ammineruthenium-Modified Ferrocytochromes c James F. Wishart, Ji Sun, Myung Cho, Chang Su, and Stephan S. Isied J. Phys. Chem. B 101, 687-693 (1997) [Find paper at ACS Publications] or use ACS Articles on Request Abstract: Several ruthenium ammine complexes were used to modify horse-heart cytochrome c at histidine-33, creating a series of (NH3)4(L)Ru-Cyt c derivatives (L = H2O/OH-, ammonia, 4-ethylpyridine, 3,5-lutidine, pyridine, isonicotinamide, N-methylpyrazinium) with a wide range of driving forces for Fe-to-Ru electron transfer (-DG° = -0.125 to +0.46 eV). Electron-transfer rates and activation parameters were measured by pulse radiolysis using azide or carbonate radicals. The driving-force dependence

419

Property:HeatRate | Open Energy Information  

Open Energy Info (EERE)

HeatRate HeatRate Jump to: navigation, search This is a property of type Number. Pages using the property "HeatRate" Showing 25 pages using this property. (previous 25) (next 25) A AES Mendota Biomass Facility + 17,873.6 + APS Biomass I Biomass Facility + 8,911 + Acme Landfill Biomass Facility + 12,916.67 + Adrian Energy Associates LLC Biomass Facility + 13,170.6 + Agrilectric Power Partners Ltd Biomass Facility + 17,327.1 + Al Turi Biomass Facility + 15,600.2 + Alabama Pine Pulp Biomass Facility + 15,826.23 + Albany Landfill Gas Utilization Project Biomass Facility + 11,913.9 + Altamont Gas Recovery Biomass Facility + 10,500 + American Canyon Power Plant Biomass Facility + 10,886.8 + American Ref-Fuel of Delaware Valley Biomass Facility + 18,674.9 +

420

Event loss rates and readout chips  

E-Print Network (OSTI)

98-57 The LHCb experiment aims at a deadtimeless readout of B­events at a primary bunch crossing rate of 40 MHz. In order to achieve this goal, information from all events must be stored in a pipeline with latency matched to the time needed for the Level 0 trigger decision. Accepted events, which constitute only a small fraction of the total sample, are stored in a fifo of a certain depth and read out with a fixed clock rate. The fifo, also referred to as multi­event or derandomizing buffer, is needed in order to even out statistical fluctuations in the trigger rate. Apart from the length of the pipeline, which determines the maximum latency of the chip, the crucial parameter characterizing a readout chip is the fraction of triggers lost due to limitations of the chip's architecture. This note describes how the different design parameters and operation conditions determine the chip's performance.

Schmelling, M

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

The Cosmic Stellar Birth and Death Rates  

E-Print Network (OSTI)

The cosmic stellar birth rate can be measured by standard astronomical techniques. It can also be probed via the cosmic stellar death rate, though until recently, this was much less precise. However, recent results based on measured supernova rates, and importantly, also on the attendant diffuse fluxes of neutrinos and gamma rays, have become competitive, and a concordant history of stellar birth and death is emerging. The neutrino flux from all past core-collapse supernovae, while faint, is realistically within reach of detection in Super-Kamiokande, and a useful limit has already been set. I will discuss predictions for this flux, the prospects for neutrino detection, the implications for understanding core-collapse supernovae, and a new limit on the contribution of type-Ia supernovae to the diffuse gamma-ray background.

John F. Beacom

2006-02-05T23:59:59.000Z

422

On the Rate of Spontaneous Magnetic Reconnection  

E-Print Network (OSTI)

Magnetic reconnection is a topological rearrangement of the magnetic field lines, leading to the release of magnetic energy, which is thought to be associated with solar flares, coronal mass ejections and magnetospheric storms. Despite magnetic field lines are supposed to be frozen into the well-conducting plasma, the reconnection observed in nature is, typically, fast, so that the rate of convergence of the magnetic field lines is the fraction of the Alfven speed, v_A. The Sweet-Parker solution predicts reconnection rates which are negligible for the solar or astrophysical conditions, this have prompted research into collisionless reconnection. The stochasticity of magnetic field lines due to ambient turbulence leads to fast reconnection and the rate was predicted to be proportional to kinetic energy density of ambient turbulence. Also, tearing instability of the thin current sheet was proposed as a driver of resistivity-independent reconnection, which was shown to be consistent with two-dimensional simulati...

Beresnyak, Andrey

2013-01-01T23:59:59.000Z

423

Critical reaction rates in hypersonic combustion chemistry  

DOE Green Energy (OSTI)

High Mach number flight requires that the scramjet propulsion system operate at a relatively low static inlet pressure and a high inlet temperature. These two constraints can lead to extremely high temperatures in the combustor, yielding high densities of radical species and correspondingly poor chemical combustion efficiency. As the temperature drops in the nozzle expansion, recombination of these excess radicals can produce more product species, higher heat yield, and potentially more thrust. The extent to which the chemical efficiency can be enhanced in the nozzle expansion depends directly on the rate of the radical recombination reactions. A comprehensive assessment of the important chemical processes and an experimental validation of the critical rate parameters is therefore required if accurate predictions of scramjet performance are to be obtained. This report covers the identification of critical reactions, and the critical reaction rates in hypersonic combustion chemistry. 4 refs., 2 figs.

Oldenborg, R.C.; Harradine, D.M.; Loge, G.W.; Lyman, J.L.; Schott, G.L.; Winn, K.R.

1989-01-01T23:59:59.000Z

424

Analytical Improvements in PV Degradation Rate Determination  

DOE Green Energy (OSTI)

As photovoltaic (PV) penetration of the power grid increases, it becomes vital to know how decreased power output may affect cost over time. In order to predict power delivery, the decline or degradation rates must be determined accurately. For non-spectrally corrected data several complete seasonal cycles (typically 3-5 years) are required to obtain reasonably accurate degradation rates. In a rapidly evolving industry such a time span is often unacceptable and the need exists to determine degradation rates accurately in a shorter period of time. Occurrence of outliers and data shifts are two examples of analytical problems leading to greater uncertainty and therefore to longer observation times. In this paper we compare three methodologies of data analysis for robustness in the presence of outliers, data shifts and shorter measurement time periods.

Jordan, D. C.; Kurtz, S. R.

2011-02-01T23:59:59.000Z

425

Self-consistent microwave plasma heating rates  

SciTech Connect

Under conditions within a hot overdense plasma corona where the field frequency is much less than the electron plasma frequency and the field period is much less than the hydrodynamic expansion time it is shown that electron field reversal heating can exceed the combined classical heating rates due to inverse bremsstrahlung (skin effect) and field pressure (PdV) by a factor approximately v/ sub e//2v/sub i/ (half the ratio of electron and ion thermal velocities). In particular this rate can exceed the inertial expansion cooling rate at a collisionless corona density of approximately 1 percent solid core density and could be realized experimentally at core temperatures approximately 3--5 keV and microwave field intensities approximately 1 MG. (auth)

Ensley, D.L.; White, R.H.

1975-10-01T23:59:59.000Z

426

Foolproof completions for high rate production wells  

E-Print Network (OSTI)

Operators, especially those managing production from deepwater reservoirs, are striving to produce hydrocarbons at higher and higher rates without exposing the wells to completion failure risk. To avoid screen failures, recent studies have favored gravel pack (GP) and high rate water pack (HRWP) completions over high-permeability fracturing (HPF), known in the vernacular as a frac&pack (FP) for very high rate wells. While a properly designed GP completion may prevent sand production, it does not stop formation fines migration, and, over time, fines accumulation in the GP will lead to increasing completion skin. Although, and not always, the skin can be removed by acidizing, it is not practical to perform repeated acid treatments on deepwater wells, particularly those with subsea wellheads, and the alternative has been to subject the completion to increasingly high drawdown, accepting a high skin effect. A far better solution is to use a HPF completion. Of course the execution of a successful HPF is not a trivial exercise, and frequently, there is a steep learning curve for such a practice. This work explains the importance to HPF completions of the well trajectory through the interval to be hydraulically fractured, for production, not execution, reasons. A new model quantifies the effect of the well inclination on the connectivity between the fracture and the well via perforations. Guidelines based on the maximum target production rate, including forecasts of multiphase flow, are provided to size the HPF completion to avoid common completion failures that may result from high fluid rate and/or fines movement. Skin model will be developed for both vertical and deviated wells. Once the HPF is properly designed and executed, the operators should end up with a long term low skin good completion quality well. The well will be safely produced at the maximum flow rates, with no need for well surveillance and monitoring.

Tosic, Slavko

2007-12-01T23:59:59.000Z

427

RATES OF RETURN AND ALTERNATIVE MEASURES OF  

E-Print Network (OSTI)

We employ the EU KLEMS database to estimate the real rate of return to capital in 14 countries (11 in the EU, three outside the EU) in 10 branches of the market economy plus the market economy as a whole. Our measure of capital is an aggregate over seven types of asset: three ICT assets and four non-ICT assets. The real rate of return in the market economy does not vary very much across countries, the extremes being Spain (high) and Italy (low). The real rate appears to be trendless in most countries. Within each country however, the rate varies widely across the 10 branches, often being implausibly high or low. We also estimate the growth of capital services by two different methods: ex-post and ex-ante, and the contribution of capital to output growth by three methods: ex-post, ex-ante and hybrid. The ex-ante method uses an estimate of the required rate of return for each country instead of the actual, average rate of return to calculate user costs and also employs the expected growth of asset prices rather than the actual growth. These estimates are derived from exactly the same data as for the ex-post method, ie without any extraneous data being employed. For estimating the contribution of capital to output growth, the ex-ante method uses ex-ante profit as the weight, while both the ex-post and the hybrid method use ex-post profit. We find that the three methods produce very similar results at the market economy level. But differences are much larger at the branch level, particularly between the ex-post and ex-ante methods.

Nicholas Oulton; Ana Rincon-aznar

2009-01-01T23:59:59.000Z

428

Neutrino Event Rates from Gamma Ray Bursts  

E-Print Network (OSTI)

We recalculate the diffuse flux of high energy neutrinos produced by Gamma Ray Bursts (GRB) in the relativistic fireball model. Although we confirm that the average single burst produces only ~10^{-2} high energy neutrino events in a detector with 1 km^2 effective area, i.e. about 10 events per year, we show that the observed rate is dominated by burst-to-burst fluctuations which are very large. We find event rates that are expected to be larger by one order of magnitude, likely more, which are dominated by a few very bright bursts. This greatly simplifies their detection.

F. Halzen; D. W. Hooper

1999-08-12T23:59:59.000Z

429

Rating of Mixed Split Residential Air Conditioners  

E-Print Network (OSTI)

A methodology is presented for rating the performance of mixed, split residential air conditioners. The method accounts for the impact on system performance of the indoor evaporator, expansion device and fan; three major components that are likely to be substituted for the matched components in a mixed system. The method allows calculation of capacity at 95°F rating point and seasonal energy efficiency ratio, SEER, without performing laboratory test of the complete system. Limitations of the procedure, present work, and anticipated improvements are also discussed.

Domanski, P. A.

1988-01-01T23:59:59.000Z

430

Heart Physiology Lab Part 1: Pulse Rate  

E-Print Network (OSTI)

Heart Physiology Lab Part 1: Pulse Rate Measure your pulse in each of the following conditions (in in the class. You may use Table 1 in the Heart Physiology Worksheet for this, if you wish. Once you have all of the class averages for each measurement. You may use Graph 1 in the Heart Physiology Worksheet for this

Loughry, Jim

431

Higgs Boson Production Rates in Hadronic Collisions  

E-Print Network (OSTI)

Higgs boson production rates at hadron colliders are reviewed with particular emphasis on progress in the calculation of higher order QCD effects. Emphasis is placed on the uncertainties in the predictions for Higgs boson production. A firm understanding of these uncertainties is crucial for extracting new physics signals.

S. Dawson

2001-11-19T23:59:59.000Z

432

ON RATES OF CONVERGENCE FOR STOCHASTIC ...  

E-Print Network (OSTI)

Our focus is on rates of convergence of estimators of optimal solutions and ..... In preparation for that result, we state the following assumption, which is similar to ...... second problem is LandS, a modification of a simple problem in electrical ...

433

Estimation of Mean Rain Rate through Censoring  

Science Conference Proceedings (OSTI)

A mixed lognormal distribution is fit to rain-rate data to estimate the space–time average. To mitigate problems associated with biased data, data below a minimum and above a maximum threshold are treated as if they are at the respective ...

Donald Martin

1999-06-01T23:59:59.000Z

434

Radar Determination of Snowfall Rate and Accumulation  

Science Conference Proceedings (OSTI)

A unique method that provides for relating radar-measured reflectivity factors to snowfall rates at the ground is presented. Data were provided by a CPS-9, 3.2 cm radar from six 1978 Massachusetts snowstorms A best-fit power-law relationship ...

Roland J. Boucher; James G. Wieler

1985-01-01T23:59:59.000Z

435

The Distant Type Ia Supernova Rate  

DOE R&D Accomplishments (OSTI)

We present a measurement of the rate of distant Type Ia supernovae derived using 4 large subsets of data from the Supernova Cosmology Project. Within this fiducial sample, which surveyed about 12 square degrees, thirty-eight supernovae were detected at redshifts 0.25--0.85. In a spatially flat cosmological model consistent with the results obtained by the Supernova Cosmology Project, we derive a rest-frame Type Ia supernova rate at a mean red shift z {approx_equal} 0.55 of 1.53 {sub -0.25}{sub -0.31}{sup 0.28}{sup 0.32} x 10{sup -4} h{sup 3} Mpc{sup -3} yr{sup -1} or 0.58{sub -0.09}{sub -0.09}{sup +0.10}{sup +0.10} h{sup 2} SNu(1 SNu = 1 supernova per century per 10{sup 10} L{sub B}sun), where the first uncertainty is statistical and the second includes systematic effects. The dependence of the rate on the assumed cosmological parameters is studied and the redshift dependence of the rate per unit comoving volume is contrasted with local estimates in the context of possible cosmic star formation histories and progenitor models.

Pain, R.; Fabbro, S.; Sullivan, M.; Ellis, R. S.; Aldering, G.; Astier, P.; Deustua, S. E.; Fruchter, A. S.; Goldhaber, G.; Goobar, A.; Groom, D. E.; Hardin, D.; Hook, I. M.; Howell, D. A.; Irwin, M. J.; Kim, A. G.; Kim, M. Y.; Knop, R. A.; Lee, J. C.; Perlmutter, S.; Ruiz-Lapuente, P.; Schahmaneche, K.; Schaefer, B.; Walton, N. A.

2002-05-28T23:59:59.000Z

436

Radiative Heating Rates for Saharan Dust  

Science Conference Proceedings (OSTI)

A combined longwave and shortwave radiative transfer model was used to determine effects of Saharan dust on the radiative fluxes and heating/cooling rates in the atmosphere. Cases are treated for cloud-free and overcast conditions over the ocean ...

Toby N. Carlson; Stanley G. Benjamin

1980-01-01T23:59:59.000Z

437

Estimating the rate of web page updates  

Science Conference Proceedings (OSTI)

Estimating the rate of Web page updates helps in improving the Web crawler's scheduling policy. But, most of the Web sources are autonomous and updated independently. Clients like Web crawlers are not aware of when and how often the sources change. Unlike ...

Sanasam Ranbir Singh

2007-01-01T23:59:59.000Z

438

Investigation of determinism in heart rate variability  

Science Conference Proceedings (OSTI)

The article searches for the possible presence of determinism in heart rate variability (HRV) signals by using a new approach based on NARMA (nonlinear autoregressive moving average) modeling and free-run prediction. Thirty-three 256-point HRV time series obtained from Wistar rats submitted to different autonomic blockade protocols are considered

M. E. D. Gomes; A. V. P. Souza; H. N. Guimarães; L. A. Aguirre

2000-01-01T23:59:59.000Z

439

Large deviation properties of constant rate data streams sharing a buffer with variable rate cross traffic  

Science Conference Proceedings (OSTI)

We consider a constant rate data stream which shares a buffer with a variable rate data stream. A first come first serve service discipline is applied at the buffer. After service at the first buffer the variable rate traffic leaves the system, whereas ... Keywords: 68M20, 90B15, Markov-modulated fluid sources, fluid model, large buffer asymptotics, many sources asymptotics, on-off sources, primary 60F10, queueing network, secondary 60K25

Kurt Majewski

2008-10-01T23:59:59.000Z

440

Construction Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

North Execution - (2009 - 2011) North Execution - (2009 - 2011) Construction Project Number 2009 2010 2011 Project Description ANMLPL 0001C 76,675.32 - - Animas-Laplata circuit breaker and power rights CRGRFL 0001C - - 7,177.09 Craig Rifle Bay and transfer bay upgrade to 2000 amps; / Convert CRG RFL to 345 kV out of Bears Ear Sub FGE 0019C - - 39,207.86 Replace 69/25kV transformer KX2A at Flaming Gorge FGE 0020C - - 52,097.12 Flaming Gorge: Replace failed KW2A transformer HDN 0069C 16,638.52 208,893.46 3,704,578.33 Replace failed transformer with KZ1A 250 MVA 230/138kv

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EPA Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (02/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Federal Register 9 Federal Register / Vol. 73, No. 32 / Friday, February 15, 2008 / Notices counties, UT, Montrose County, CO, and Uinta County, WY. Summary: EPA has environmental concerns about potential water quality impacts and recommends that the final EIS evaluate and compare the environmental impacts by alternative, of removing interim protections from the 86 eligible stream segments. Rating EC1. Final EISs EIS No. 20070530, ERP No. F-COE- E39071-00, Wolf Creek Dam/Lake Cumberland Project, Emergency Measures in Response to Seepage, Mississippi River, South Central Kentucky and Central Tennessee. Summary: EPA continues to have environmental concerns about water quantity and water quality impacts. EIS No. 20070556, ERP No. F-NGB- E11062-MS, Camp Shelby Joint Force

442

Microsoft PowerPoint - anderson_epri.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Review ETO STATCOM Demonstration Project Update September 30, 2008 Wayne Litzenberger-DesignTech Loren Anderson-BPA Participants * DOE Energy Storage Program * Sandia National Lab * NCSU * EPRI * TVA * BPA * Florida State University-Center for Advanced Power Systems * Tri-State * AES-SeaWest * Commercial Vendor ? CONDON WIND FARM Proposed Host Site Full Scale Demonstration Project * 10 MVA STATCOM with battery storage * Adjacent to Condon Wind Park * Mitsubishi Type 1 induction machines * Poor voltage regulation * Long line with many small customers Proposed 10 MVA ETO STATCOM for Condon Wind Farm 0.6886mH I=1400 A (RMS) with IEEE 519 standards ETO Voltage Source Converter (transformer leakage inductance) I=1400 A (RMS) with IEEE 519 standards 69kv bus Condon Windfarm Problems

443

A New Series of Rate Decline Relations Based on the Diagnosis of Rate-Time Data  

E-Print Network (OSTI)

The so-called "Arps" rate decline relations are by far the most widely used tool for assessing oil and gas reserves from rate performance. These relations (i.e., the exponential and hyperbolic decline relations) are empirical where the starting point for their derivation is given by the definitions of the "loss ratio" and the "derivative of the loss ratio", where the "loss ratio" is the ratio of rate data to derivative of rate data, and the "derivative of the loss ratio" is the "b-parameter" as defined by Arps [1945]. The primary goal of this work is the interpretation of the b-parameter continuously over time and thus the better understanding of its character. As is shown below we propose "monotonically decreasing functional forms" for the characterization of the b-parameter, in addition to the exponential and hyperbolic rate decline relations, where the b-parameter is assumed to be zero and constant, respectively. The proposed equations are as follow: b(t)=constant (Arps' hyperbolic rate-decline relation), []tbbtb10exp)(-bt= (exponential function), (power-law function), 10)(btbtb=)/(1)(10tbbtb+= (rational function). The corresponding rate decline relation for each case is obtained by solving the differential equation associated with the selected functional for the b-parameter. The next step of this procedure is to test and validate each of the rate decline relations by applying them to various numerical simulation cases (for gas), as well as for field data cases obtained from tight/shale gas reservoirs. Our results indicate that b-parameter is never constant but it changes continuously with time. The ultimate objective of this work is to establish each model as a potential analysis/diagnostic relation. Most of the proposed models yield more realistic estimations of gas reserves in comparison to the traditional Arps' rate decline relations (i.e., the hyperbolic decline) where the reserves estimates are inconsistent and over-estimated. As an example, the rational b-parameter model seems to be the most accurate model in terms of representing the character of rate data; and therefore, should yield more realistic reserves estimates. Illustrative examples are provided for better understanding of each b-parameter rate decline model. The proposed family of rate decline relations was based on the character of the b-parameter computed from the rate-time data and they can be applied to a wide range of data sets, as dictated by the character of rate data.

Boulis, Anastasios

2009-08-01T23:59:59.000Z

444

Rate Us - ORNL DAAC Feedback Forum  

NLE Websites -- All DOE Office Websites (Extended Search)

Help > Feedback Help > Feedback Rate Us - ORNL DAAC Feedback Forum To improve service to our customers, this forum provides a means to monitor user satisfaction. Please take a moment to tell us about your experience. Consider Data availability, accessibility, and value Web navigation and content Customer service Your responses will remain anonymous in keeping with our Privacy Policy. Select one of the following options that best describes your experience with the ORNL DAAC. Positive Mixed Negative If you wish to add comments or to explain your rating, please enter your comments in the box below. If you would like us to reply to your comments or concern, please enter your e-mail address here: Please solve the following simple math problem: 4 x 2 = help icon Submit Feedback Clear form

445

Thermal dilepton rates from quenched lattice QCD  

E-Print Network (OSTI)

We present new lattice results on the continuum extrapolation of the vector current correlation function. Lattice calculations have been carried out in the deconfined phase at a temperature of 1.1 Tc, extending our previous results at 1.45 Tc, utilizing quenched non-perturbatively clover-improved Wilson fermions and light quark masses. A systematic analysis on multiple lattice spacings allows to perform the continuum limit of the correlation function and to extract spectral properties in the continuum limit. Our current analysis suggests the results for the electrical conductivity are proportional to the temperature and the thermal dilepton rates in the quark gluon plasma are comparable for both temperatures. Preliminary results of the continuum extrapolated correlation function at finite momenta, which relates to thermal photon rates, are also presented.

H. -T. Ding; A. Francis; O. Kaczmarek; F. Karsch; E. Laermann; S. Mukherjee; M. Müller; W. Soeldner

2013-01-30T23:59:59.000Z

446

Stretch rate of tubular premixed flames  

Science Conference Proceedings (OSTI)

Following Seshadri and Williams solution describing the flow field for the opposed jet burner, the analytical solution is given for the flow field of two other burners: the opposed tubular burner and the tubular burner. Under plug flow boundary conditions, it is shown that the stretch rate at the stagnation surface of the opposed tubular burner is k=pV/(R{sub 2}-R{sub 1}) for the case of equal velocities and equal densities (i.e., r{sub 1}=r{sub 2} and V{sub 1}=-V{sub 2}=V). For the tubular burner, the stretch rate at the center of the burner is k=pV/R{sub 2}. The comparison of the numerical simulation and analytical solution is carried out to verify the analytical solution. (author)

Wang, Peiyong; Wehrmeyer, Joseph A.; Pitz, Robert W. [Mechanical Engineering Department, Vanderbilt University, Nashville, TN 37235 (United States)

2006-04-15T23:59:59.000Z

447

Subsurface heaters with low sulfidation rates  

SciTech Connect

A system for heating a hydrocarbon containing formation includes a heater having an elongated ferromagnetic metal heater section. The heater is located in an opening in a formation. The heater section is configured to heat the hydrocarbon containing formation. The exposed ferromagnetic metal has a sulfidation rate that goes down with increasing temperature of the heater, when the heater is in a selected temperature range.

John, Randy Carl; Vinegar, Harold J

2013-12-10T23:59:59.000Z

448

Decoherence rates for Galilean covariant dynamics  

E-Print Network (OSTI)

We introduce a measure of decoherence for a class of density operators. For Gaussian density operators in dimension one it coincides with an index used by Morikawa (1990). Spatial decoherence rates are derived for three large classes of the Galilean covariant quantum semigroups introduced by Holevo. We also characterize the relaxation to a Gaussian state for these dynamics and give a theorem for the convergence of the Wigner function to the probability distribution of the classical analog of the process.

Jeremy Clark

2007-10-08T23:59:59.000Z

449

Heating Rate Profiles in Galaxy Clusters  

E-Print Network (OSTI)

In recent years evidence has accumulated suggesting that the gas in galaxy clusters is heated by non-gravitational processes. Here we calculate the heating rates required to maintain a physically motived mass flow rate, in a sample of seven galaxy clusters. We employ the spectroscopic mass deposition rates as an observational input along with temperature and density data for each cluster. On energetic grounds we find that thermal conduction could provide the necessary heating for A2199, Perseus, A1795 and A478. However, the suppression factor, of the clasical Spitzer value, is a different function of radius for each cluster. Based on the observations of plasma bubbles we also calculate the duty cycles for each AGN, in the absence of thermal conduction, which can provide the required energy input. With the exception of Hydra-A it appears that each of the other AGNs in our sample require duty cycles of roughly $10^{6}-10^{7}$ yrs to provide their steady-state heating requirements. If these duty cycles are unrealistic, this may imply that many galaxy clusters must be heated by very powerful Hydra-A type events interspersed between more frequent smaller-scale outbursts. The suppression factors for the thermal conductivity required for combined heating by AGN and thermal conduction are generally acceptable. However, these suppression factors still require `fine-tuning` of the thermal conductivity as a function of radius. As a consequence of this work we present the AGN duty cycle as a cooling flow diagnostic.

Edward C. D. Pope; Georgi Pavlovski; Christian R. Kaiser; Hans Fangohr

2006-01-05T23:59:59.000Z

450

Category:Utility Rates | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Category Edit History Facebook icon Twitter icon » Category:Utility Rates Jump to: navigation, search Add a new Utility Rate Pages in category "Utility Rates" The following 200 pages are in this category, out of 42,539 total. (previous 200) (next 200) 0 Data:0000827d-84d0-453d-b659-b86869323897 Data:000086db-7a5e-4356-9c57-c912f7d1622e Data:0003a8b3-04b9-4ecb-b06d-6022e7f0f009 Data:000470c7-df04-47aa-bdd2-d70f0a2c52b3 Data:000b6dfa-a541-428a-9029-423006e22a34 Data:000db36e-b548-43e7-a283-d37ecc77cef1 Data:000e60f7-120d-48ab-a1f9-9c195329c628 Data:00101108-073b-4503-9cd4-01769611c26f Data:001361ca-50d2-49bc-b331-08755a2c7c7d

451

Dependency and false discovery rate: Asymptotics  

E-Print Network (OSTI)

Some effort has been undertaken over the last decade to provide conditions for the control of the false discovery rate by the linear step-up procedure (LSU) for testing $n$ hypotheses when test statistics are dependent. In this paper we investigate the expected error rate (EER) and the false discovery rate (FDR) in some extreme parameter configurations when $n$ tends to infinity for test statistics being exchangeable under null hypotheses. All results are derived in terms of $p$-values. In a general setup we present a series of results concerning the interrelation of Simes' rejection curve and the (limiting) empirical distribution function of the $p$-values. Main objects under investigation are largest (limiting) crossing points between these functions, which play a key role in deriving explicit formulas for EER and FDR. As specific examples we investigate equi-correlated normal and $t$-variables in more detail and compute the limiting EER and FDR theoretically and numerically. A surprising limit behavior occ...

Finner, Helmut; Roters, Markus

2007-01-01T23:59:59.000Z

452

Neutrino energy loss rates and positron capture rates on $^{55}$Co for presupernova and supernova physics  

E-Print Network (OSTI)

Proton-neutron quasi-particle random phase approximation (pn-QRPA) theory has recently being used for calculation of stellar weak interaction rates of $fp$-shell nuclide with success. Neutrino losses from proto-neutron stars play a pivotal role to decide if these stars would be crushed into black holes or explode as supernovae. The product of abundance and positron capture rates on $^{55}$Co is substantial and as such can play a role in fine tuning of input parameters of simulation codes specially in the presupernova evolution. Recently we introduced our calculation of capture rates on $^{55}$Co, in a luxurious model space of $7 \\hbar \\omega$, employing the pn-QRPA theory with a separable interaction. Simulators, however, may require these rates on a fine scale. Here we present for the first time an expanded calculation of the neutrino energy loss rates and positron capture rates on $^{55}$Co on an extensive temperature-density scale. These type of scale is appropriate for interpolation purposes and of greater utility for simulation codes. The pn-QRPA calculated neutrino energy loss rates are enhanced roughly up to two orders of magnitude compared with the large-scale shell model calculations and favor a lower entropy for the core of massive stars.

Jameel-Un Nabi; Muhammad Sajjad

2011-08-03T23:59:59.000Z

453

Occurrence rate of extreme magnetic storms  

E-Print Network (OSTI)

Statistical analysis of occurrence rate of magnetic storms induced by different types of interplanetary drivers is made on the basis of OMNI data for period 1976-2000. Using our catalog of large scale types of solar wind streams we study storms induced by interplanetary coronal mass ejections (ICME) (separately magnetic clouds (MC) and Ejecta) and both types of compressed regions: corotating interaction regions (CIR) and Sheaths. For these types of drivers we calculate integral probabilities of storms with minimum Dst storms shows that such a magnetic storm as Carrington storm in 1859 with Dst = -1760 nT is observed on the Earth with frequency 1 event during ~500 year.

Yermolaev, Yu I; Nikolaeva, N S; Yermolaev, M Yu

2013-01-01T23:59:59.000Z

454

Relevant energy ranges for astrophysical reaction rates  

Science Conference Proceedings (OSTI)

Effective energy windows (Gamow windows) of astrophysical reaction rates for (p,gamma), (p,n), (p,alpha), (alpha,gamma), (alpha,n), (alpha,p), (n,gamma), (n,p), and (n,alpha) on targets with 10<=Z<=83 from proton to neutron dripline are calculated using theoretical cross sections. It is shown that widely used approximation formulas for the relevant energy ranges are not valid for a large number of reactions relevant to hydrostatic and explosive nucleosynthesis. The influence of the energy dependence of the averaged widths on the location of the Gamow windows is discussed and the results are presented in tabular form.

Rauscher, Thomas [Department of Physics, University of Basel, Klingelbergstr. 82, CH-4056 Basel (Switzerland)

2010-04-15T23:59:59.000Z

455

Reverse Engineering of Proteasomal Translocation Rates  

E-Print Network (OSTI)

We address the problem of proteasomal protein translocation and introduce a new stochastic model of the proteasomal digestion (cleavage) of proteins. In this model we account for the protein translocation and the positioning of cleavage sites of a proteasome from first principles. We show by test examples and by processing experimental data that our model allows reconstruction of the translocation and cleavage rates from mass spectroscopy data on digestion patterns and can be used to investigate the properties of transport in different experimental set-ups. Detailed investigation with this model will enable theoretical quantitative prediction of the proteasomal activity.

D. S. Goldobin; M. Mishto; K. Textoris-Taube; P. M. Kloetzel; A. Zaikin

2008-04-04T23:59:59.000Z

456

Estimating meteor rates using Bayesian inference  

E-Print Network (OSTI)

A method for estimating the true meteor rate \\lambda\\ from a small number of observed meteors n is derived. We employ Bayesian inference with a Poissonian likelihood function. We discuss the choice of a suitable prior and propose the adoption of Jeffreys prior, P(\\lambda)=\\lambda^{-0.5}, which yields an expectation value E(\\lambda) = n+0.5 for any n \\geq 0. We update the ZHR meteor activity formula accordingly, and explain how 68%- and 95%-confidence intervals can be computed.

Barentsen, Geert; Fröhlich, Hans-Erich

2011-01-01T23:59:59.000Z

457

Liability aspects of home energy-rating systems  

SciTech Connect

Liability aspects of home energy rating systems are discussed. An introduction to the rating system concept, including types of rating systems, implementation efforts to date, and possible groups to conduct ratings, is also included. The home energy rating system concept involves the periodic rating of the energy efficiency of residential buildings. The rating can provide a relative indication of a home's energy efficiency and also a quantitative estimate of consumption, fuel cost, or both. Primary attention is given to liability issues associated with developing and performing ratings. Secondary attention is given to possible liability associated with misuse of a rating once it has been performed.

Hendrickson, P.L.

1983-10-01T23:59:59.000Z

458

Corrosion Rate, Effect of Soil Properties: Development of a Sensor System to Calculate Corrosion Rates  

Science Conference Proceedings (OSTI)

This report addresses corrosion of substation ground grids and the development of a corrosion sensor system and supporting algorithms that can be used in the field to quickly estimate the corrosion rate of a metal in soils of low resistivity.The system is based on the linear polarization resistance (LPR) technique, an electrochemical method of calculating corrosion rates by measuring the relationship between electrochemical potential and the electric current between electrodes. ...

2013-12-16T23:59:59.000Z

459

Provo River Project Power Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Provo River Project Power Sales Rate History Updated: 12/20/2013 Rate Schedule Effective Dates Energy (Mills/kWh) Capacity ($/kW-mo.) Combined (Mills/kWh) Administrative Action 4/58 - 6/64 (Summer Season) 3.000 N.A. N.A. Administrative Action 10/58 - 4/64 (Winter Season) 4.500 N.A. N.A. Administrative Action 7/64 - 9/79 (Summer Season) 5.000 N.A. N.A. Administrative Action 10/64 - 9/79 (Winter Season) 3.000 N.A. N.A. Administrative Action 10/79 - 9/82 6.000 N.A. N.A. Administrative Action 10/82 - 9/90 6.850 N.A. N.A. Administrative Action 10/90 - 9/94 8.000 N.A. N.A. Administrative Action 10/94 - Present Installments N.A. N.A. Note: The Provo River Project sells energy only. As of October 1994, customers pay all OM&R expenses and in return, receive all the energy produced by the Project.

460

Coincident count rates in absorbing dielectric media  

E-Print Network (OSTI)

A study of the effects of absorption on the nonlinear process of parametric down conversion is presented. Absorption within the nonlinear medium is accounted for by employing the framework of macroscopic QED and the Green tensor quantization of the electromagnetic field. An effective interaction Hamiltonian, which describes the nonlinear interaction of the electric field and the linear noise polarization field, is used to derive the quantum state of the light leaving a nonlinear crystal. The signal and idler modes of this quantum state are found to be a superpositions of the electric and noise polarization fields. Using this state, the expression for the coincident count rates for both Type I and Type II conversion are found. The nonlinear interaction with the noise polarization field were shown to cause an increase in the rate on the order of 10^{-12} for absorption of 10% per cm. This astonishingly small effect is found to be negligible compared to the decay caused by linear absorption of the propagating modes. From the expressions for the biphoton amplitude it can be seen the maximally entangled states can still be produced even in the presence of strong absorption.

J. A. Crosse; Stefan Scheel

2010-12-03T23:59:59.000Z

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Coincident count rates in absorbing dielectric media  

E-Print Network (OSTI)

A study of the effects of absorption on the nonlinear process of parametric down conversion is presented. Absorption within the nonlinear medium is accounted for by employing the framework of macroscopic QED and the Green tensor quantization of the electromagnetic field. An effective interaction Hamiltonian, which describes the nonlinear interaction of the electric field and the linear noise polarization field, is used to derive the quantum state of the light leaving a nonlinear crystal. The signal and idler modes of this quantum state are found to be a superpositions of the electric and noise polarization fields. Using this state, the expression for the coincident count rates for both Type I and Type II conversion are found. The nonlinear interaction with the noise polarization field were shown to cause an increase in the rate on the order of 10^{-12} for absorption of 10% per cm. This astonishingly small effect is found to be negligible compared to the decay caused by linear absorption of the propagating mo...

Crosse, J A

2010-01-01T23:59:59.000Z

462

Abnormal heart rate turbulence predicts the initiation of ventricular arrhythmias  

E-Print Network (OSTI)

atrial pacing with onset heart rate = 99 beats/min. (C)Thonet G, Vesin J-M, et al. Heart rate dynamics at the on-M, Barthel P, et al. Heart-rate turbulence after ventricular

Iwasa, Atsushi; Hwa, Michael; Hassankhani, Alborz; Liu, Taylor; Narayan, Sanjiv M

2005-01-01T23:59:59.000Z

463

PowerChoice Residential Customer Response to TOU Rates  

E-Print Network (OSTI)

1983. Time-of-Day Electricity Rates for the United States.to Voluntary Time-of-Use Electricity Rates. ” Resource andCompared to your old electricity rate, would you say that

Peters, Jane S.

2010-01-01T23:59:59.000Z

464

Fair rate assignment in interference limited multi-hop networks  

E-Print Network (OSTI)

1.2 Utility Based Fair Rate Assignment . . . . . . 1.2.1de?ned in [21]. Utility Based Fair Rate Assignment In thisfunction. The utility based fair rate assignment policy (

Arisoylu, Mustafa

2006-01-01T23:59:59.000Z

465

Quantitative relationship of sick building syndrome symptoms with ventilation rates  

E-Print Network (OSTI)

32%), and as ventilation rate increases from 10 to 25 L/s-0.85) as ventilation rate increases from 10 to 25 L/s-29% as ventilation rate increases from 10 to 25 L/s-person.

Fisk, William J.

2009-01-01T23:59:59.000Z

466

Better Buildings Neighborhood Program: Low-Interest Rates Entice...  

NLE Websites -- All DOE Office Websites (Extended Search)

rate. EnergyWorks in Philadelphia is using low-interest loan rates to incentivize homeowners by tying the interest rate to the number of energy efficiency measures incorporated...

467

Quantitative relationship of sick building syndrome symptoms with ventilation rates  

E-Print Network (OSTI)

at two outdoor air supply rates." Indoor Air 14 Suppl 8: 7-Miettinen (1995). "Ventilation rate in office buildings andAssociation of ventilation rates and CO 2 concentrations

Fisk, William J.

2009-01-01T23:59:59.000Z

468

An Equilibrium Model of "Global Imbalances" and Low Interest Rates  

E-Print Network (OSTI)

were converted into dollars using daily exchange rates.and Flexible Ex- change Rates, MIT Press, 1982, pp. 116–156.Imbalances” and Low Interest Rates Ricardo J. Caballero

Caballero, Ricardo J; Farhi, Emmanuel; Gourinchas, Pierre-Olivier

2006-01-01T23:59:59.000Z

469

PowerChoice Residential Customer Response to TOU Rates  

E-Print Network (OSTI)

1983. Time-of-Day Electricity Rates for the United States.Effect of Time-of-Use Rates In the Los Angeles ElectricityCustomer Response to TOU Rates. Research Into Action. Public

Peters, Jane S.

2010-01-01T23:59:59.000Z

470

Optimal Growth Rates in the Quasigeostrophic Initial Value Problem  

Science Conference Proceedings (OSTI)

A large class of wave structures in quasigeostrophic flow have instantaneous growth rates significantly larger than normal-mode growth rates. Since energy and potential enstrophy growth rates can be defined as functions of the perturbation ...

Enda O'Brien

1992-09-01T23:59:59.000Z

471

Age effects on atrophy rates of entorhinal cortex and hippocampus  

E-Print Network (OSTI)

WJ, et al. Higher atrophy rate of entorhinal cortex thanBL, Reed BR, et al. Atrophy rates of entorhinal cortex in ADPC, Smith GE, Ivnik RJ, et al. Rates of hippocampal atrophy

2006-01-01T23:59:59.000Z

472

Rates and progenitors of type Ia supernovae  

SciTech Connect

The remarkable uniformity of Type Ia supernovae has allowed astronomers to use them as distance indicators to measure the properties and expansion history of the Universe. However, Type Ia supernovae exhibit intrinsic variation in both their spectra and observed brightness. The brightness variations have been approximately corrected by various methods, but there remain intrinsic variations that limit the statistical power of current and future observations of distant supernovae for cosmological purposes. There may be systematic effects in this residual variation that evolve with redshift and thus limit the cosmological power of SN Ia luminosity-distance experiments. To reduce these systematic uncertainties, we need a deeper understanding of the observed variations in Type Ia supernovae. Toward this end, the Nearby Supernova Factory has been designed to discover hundreds of Type Ia supernovae in a systematic and automated fashion and study them in detail. This project will observe these supernovae spectrophotometrically to provide the homogeneous high-quality data set necessary to improve the understanding and calibration of these vital cosmological yardsticks. From 1998 to 2003, in collaboration with the Near-Earth Asteroid Tracking group at the Jet Propulsion Laboratory, a systematic and automated searching program was conceived and executed using the computing facilities at Lawrence Berkeley National Laboratory and the National Energy Research Supercomputing Center. An automated search had never been attempted on this scale. A number of planned future large supernovae projects are predicated on the ability to find supernovae quickly, reliably, and efficiently in large datasets. A prototype run of the SNfactory search pipeline conducted from 2002 to 2003 discovered 83 SNe at a final rate of 12 SNe/month. A large, homogeneous search of this scale offers an excellent opportunity to measure the rate of Type Ia supernovae. This thesis presents a new method for analyzing the true sensitivity of a multi-epoch supernova search and finds a Type Ia supernova rate from z {approx} 0.01-0.1 of r{sub V} = 4.26{sub -1.93 -0.10}{sup +1.39 +0.10} h{sup 3} x 10{sup -4} SNe Ia/yr/Mpc{sup 3} from a preliminary analysis of a subsample of the SNfactory prototype search. Several unusual supernovae were found in the course of the SNfactory prototype search. One in particular, SN 2002ic, was the first SN Ia to exhibit convincing evidence for a circumstellar medium and offers valuable insight into the progenitors of Type Ia supernovae.

Wood-Vasey, William Michael

2004-08-16T23:59:59.000Z

473

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

load load Type Term Title Author Replies Last Post sort icon Blog entry building load Commercial and Residential Hourly Load Data Now Available on OpenEI! Sfomail 17 May 2013 - 12:03 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

474

Rate Schedule CV-NWT5  

NLE Websites -- All DOE Office Websites (Extended Search)

NWT5 NWT5 (Supersedes Schedule CV-NWT4) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR NETWORK INTEGRATION TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) Network Integration Transmission Service (NITS). Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to

475

Rate Schedule COTP-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

COTP-T3 COTP-T3 (Supersedes Schedule COTP-T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CALIFORNIA-OREGON TRANSMISSION PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving California-Oregon Transmission Project (COTP) firm and/or non-firm point-to-point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

476

Rate Schedule CV-F13  

NLE Websites -- All DOE Office Websites (Extended Search)

F13 F13 (Supersedes Schedule CV-F12) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATES FOR BASE RESOURCE AND FIRST PREFERENCE POWER Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To the Base Resource (BR) and First Preference (FP) Power Customers. Character and Conditions of Service: Alternating current, 60-hertz, three-phase, delivered and metered at the voltages and points established by contract. This service includes the Central Valley Project (CVP) transmission (to include reactive supply and voltage control from Federal generation sources needed to support

477

Rate Schedule CV-TPT7  

NLE Websites -- All DOE Office Websites (Extended Search)

TPT7 TPT7 (Supersedes Schedule CV-TPT6) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To Western's power service customers who require transmission service by a third party to receive power sold by Western. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points as

478

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

DOE DOE Type Term Title Author Replies Last Post sort icon Blog entry DOE FOA aimed at growing expansive database of Renewable Energy and Energy Efficiency Incentives and Policies Graham7781 12 Dec 2012 - 11:30 Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis Rmckeel Sfomail Recent members: MSiira Apin101 Lissacoffey Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng 429 Throttled (bot load) Error 429 Throttled (bot load)

479

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

FOA FOA Type Term Title Author Replies Last Post sort icon Blog entry FOA FOA aimed at growing expansive database of Renewable Energy and Energy Efficiency Incentives and Policies Graham7781 12 Dec 2012 - 11:30 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

480

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Incentives and Policies Incentives and Policies Type Term Title Author Replies Last Post sort icon Blog entry Incentives and Policies Semantic Mediawiki Semantic Forms update Rmckeel 22 Oct 2012 - 07:23 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

Note: This page contains sample records for the topic "kv rating mva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Rate Schedule CV-EID4  

NLE Websites -- All DOE Office Websites (Extended Search)

EID4 EID4 (Supersedes Schedule CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Energy Imbalance (EI) service. Character and Conditions of Service: EI is provided when a difference occurs between the scheduled and the actual delivery of energy to a load within the Sub-Balancing Authority (SBA) over an hour or in accordance with approved policies and procedures. The deviation, in megawatts, is the net scheduled amount of

482

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

funding funding Type Term Title Author Replies Last Post sort icon Blog entry funding FOA aimed at growing expansive database of Renewable Energy and Energy Efficiency Incentives and Policies Graham7781 12 Dec 2012 - 11:30 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load)

483

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

clean energy clean energy Type Term Title Author Replies Last Post sort icon Blog entry clean energy Nominations open for $250,000 Multimedia Clean Energy prizes Graham7781 2 Oct 2012 - 13:01 Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis Rmckeel Sfomail Recent members: MSiira Apin101 Lissacoffey Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

484

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

dataset dataset Type Term Title Author Replies Last Post sort icon Blog entry dataset Commercial and Residential Hourly Load Data Now Available on OpenEI! Sfomail 17 May 2013 - 12:03 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

485

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

commercial load commercial load Type Term Title Author Replies Last Post sort icon Blog entry commercial load Commercial and Residential Hourly Load Data Now Available on OpenEI! Sfomail 17 May 2013 - 12:03 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

486

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

datasets datasets Type Term Title Author Replies Last Post sort icon Blog entry datasets Commercial and Residential Hourly Load Data Now Available on OpenEI! Sfomail 17 May 2013 - 12:03 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

487

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Global Atlas Global Atlas Type Term Title Author Replies Last Post sort icon Blog entry Global Atlas IRENA launches global atlas of renewable energy potential Graham7781 11 Feb 2013 - 15:18 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

488

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

electric load data electric load data Type Term Title Author Replies Last Post sort icon Blog entry electric load data Commercial and Residential Hourly Load Data Now Available on OpenEI! Sfomail 17 May 2013 - 12:03 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

489

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

load data load data Type Term Title Author Replies Last Post sort icon Blog entry building load data Commercial and Residential Hourly Load Data Now Available on OpenEI! Sfomail 17 May 2013 - 12:03 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

490

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Energy Visions Prize Energy Visions Prize Type Term Title Author Replies Last Post sort icon Blog entry Energy Visions Prize Nominations open for $250,000 Multimedia Clean Energy prizes Graham7781 2 Oct 2012 - 13:01 Groups Menu You must login in order to post into this group. Recent content FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated Glad I could help get you on t... Nick, Thanks very much! That... more Group members (25) Managers: Dloomis Rmckeel Sfomail Recent members: Denizurla Bazouing Gdavis Shehant Anapettirossi Abkatzman BijouLulla Vbugnion Marklane Cbonsig Verdel3c Wisconsin Weatherall Windows Payne Nlong Wzeng Nsbowde Rmbot Ewilson 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

491

Mutual information rate and bounds for it  

E-Print Network (OSTI)

The amount of information exchanged per unit of time between two nodes in a dynamical network or between two data sets is a powerful concept for analysing complex systems. This quantity, known as the mutual information rate (MIR), is calculated from the mutual information, which is rigorously defined only for random systems. Moreover, the definition of mutual information is based on probabilities of significant events. This work offers a simple alternative way to calculate the MIR in dynamical (deterministic) networks or between two data sets (not fully deterministic), and to calculate its upper and lower bounds without having to calculate probabilities, but rather in terms of well known and well defined quantities in dynamical systems. As possible applications of our bounds, we study the relationship between synchronisation and the exchange of information in a system of two coupled maps and in experimental networks of coupled oscillators.

M. S. Baptista; R. M. Rubinger; E. R. V. Junior; J. C. Sartorelli; U. Parlitz; C. Grebogi

2011-04-18T23:59:59.000Z

492

Filters for High Rate Pulse Processing  

E-Print Network (OSTI)

We introduce a filter-construction method for pulse processing that differs in two respects from that in standard optimal filtering, in which the average pulse shape and noise-power spectral density are combined to create a convolution filter for estimating pulse heights. First, the proposed filters are computed in the time domain, to avoid periodicity artifacts of the discrete Fourier transform, and second, orthogonality constraints are imposed on the filters, to reduce the filtering procedure's sensitivity to unknown baseline height and pulse tails. We analyze the proposed filters, predicting energy resolution under several scenarios, and apply the filters to high-rate pulse data from gamma-rays measured by a transition-edge-sensor microcalorimeter.

B. K. Alpert; R. D. Horansky; D. A. Bennett; W. B. Doriese; J. W. Fowler; A. S. Hoover; M. W. Rabin; J. N. Ullom

2012-12-07T23:59:59.000Z

493

Measuring rates of outdoor airflow into HVAC systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Measuring rates of outdoor airflow into HVAC systems Title Measuring rates of outdoor airflow into HVAC systems Publication Type Journal Article LBNL Report Number LBNL-51583 Year...

494