EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

2

500 kV transmission line design and fault analysis.  

E-Print Network [OSTI]

??To be able to keep up with energy demands new transmission lines need to be designed and built. Design and planning is a long process… (more)

Haskovic, Mensur

2012-01-01T23:59:59.000Z

3

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

4

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

5

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

6

ETM (Distribution Network Automation on 10 kV cable line stations...  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

7

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect (OSTI)

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

8

Microsoft Word - Deering Lake-Eckley 115-kV Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deering Lake-Eckley 115-kV Transmission Line Structure Replacements Yuma County, Colorado 1 A. Brief Description of Proposal: Western Area Power Administration (Western) proposes...

9

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

10

Mead-Liberty 345-kV Transmission Line Access Road Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Mead-Liberty 345-kV Transmission Line Access Road Maintenance and Localized Vegetation Management Maricopa County, Arizona Categorical Exclusion Continuation Sheet Project...

11

Bouse Hills Pumping Plant to Harcuvar 115-kV Transmission Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bouse Hills Pumping Plant to Harcuvar 115-kV Transmission Line Inset Structure Installation La Paz County, Arizona Categorical Exclusion Continuation Sheet Special Conditions 1....

12

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

13

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

14

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

SciTech Connect (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

15

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

16

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

17

Grounding of a 230 kV Transmission line over a Limestone Ridge.  

E-Print Network [OSTI]

?? This thesis is a case study of a 230 kV transmission line in Lao P.D.R. Grounding of electrical systems is essential for safety and… (more)

Grubbström, Emma

2011-01-01T23:59:59.000Z

18

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

19

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

20

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Notification of Planned 230kV Outage at Potomac River Generating Station  

Broader source: Energy.gov (indexed) [DOE]

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

22

Final Environmental Assessment of the Trentwood Loop to the Bell-Noxon 230-kV No.1 Line.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) proposes to construct a 2.7mile (4.3-kilometer), 230-kV, double-circuit steel structured trasmission line and to install a 230/115-kV, 300 MVA autotransformer with one 115-kV terminal at Trentwood in unincorporated Spokane County, WA, about 9 miles (14.5 kilometers) east of the City of Spokane. The Bell-Noxon 230-kV No. 1 Line would be opened near Trentwood. The proposed double-circuit line would be tied to the two opened ends of the Bell-Noxon line and brought into a common 230-kV bust at Trentwood Substation via the proposed double-circuit line; this is commonly known as looping a line into a substation. This report addresses the environmental impacts of various alternative solutions. 32 refs, 3 figs., 2 tabs.

United States. Bonneville Power Administration.

1982-05-01T23:59:59.000Z

23

EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

24

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable line stations) Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

25

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

26

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

27

EIS-0365: Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov [DOE]

On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

28

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

29

AC and lightning performance of fiberglass crossarms aged in 115 kV transmission line  

SciTech Connect (OSTI)

This paper presents the results of an investigation of the electrical performance of 115 kV transmission line fiberglass cross-arm used by Mississippi Power and Light Company. A transmission line fiberglass crossarm removed from service and companion cross-arms outdoors but not in service were examined. The evaluation of electrical performance was based on flashover voltage value at AC voltage and standard lightning impulses as well as under dry and wet conditions. The tests were performed in the Mississippi State University High Voltage Laboratory. The obtained flashover voltages show no large differences in electrical strength of fiberglass crossarms removed from service and those stored outdoors. The Added CFO voltage by fiberglass crossarm to the porcelain suspension insulators is presented versus the length of the fiberglass crossarm for dry and wet conditions.

Grzybowski, S. (Mississippi State Univ., Mississippi State, MS (United States). Dept. of Electrical and Computer Engineering); Jenkins, E.B. (Entergy, New Orleans, LA (United States). Generation and Transmission Group)

1993-10-01T23:59:59.000Z

30

Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.  

SciTech Connect (OSTI)

Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

Lee, Jack M.

1992-06-01T23:59:59.000Z

31

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

SciTech Connect (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

32

Alvey-Fairview No.1, 230 kV Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration is planning to rebuild the Alvey Fairview No. 1, 230kV transmission line, construction is scheduled for 2013 or 2014. The 97.46 mile transmission line...

33

EMI (electromagnetic interference) potential of proposed 115KV line near B-691  

SciTech Connect (OSTI)

The Laser Operated Diamond Turning Machine (LODTM) is housed in Building 691. This facility contains electronic measurement and control systems which could be susceptible to interfering electromagnetic interference (EMI) generated by sources external to B-691. In particular, concern has been expressed that such harmful EMI signals could be produced by the proposed WAPA 115KV feeder line which would be routed approximately 30 feet from the East side of the facility. Also, there has been some concern expressed about the effects of the resulting electromagnetic (EM) fields on personnel in the proximity of the power line. Since it is necessary to measure the EM fields to ascertain if a hazard does indeed exist, and since we in ERD have been performing such field measurements for many years, we were contacted to determine the field levels from the line that might be expected inside and close to B-691. This report describes our approach, equipment and calibration procedures, analysis techniques used, results, and suggestions for future work in related areas. 9 refs., 41 figs.

Latorre, V.R.; Wythe, D.M.

1989-07-27T23:59:59.000Z

34

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

35

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

36

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

37

EIS-0399: Final EIS for the Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line Comments/Response  

Broader source: Energy.gov (indexed) [DOE]

9 9 Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line VOLUME 2 COMMENT RESPONSE DOCUMENT September 2008 United States Department of Energy State of Montana Department of Environmental Quality COVER SHEET Responsible Agencies: U.S. Department of Energy (DOE) and Montana Department of Environmental Quality (DEQ) are co-lead agencies; the Bureau of Land Management (BLM), U.S. Department of the Interior, is a cooperating agency. Title: Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399) Location: Cascade, Teton, Chouteau, Pondera, Toole, and Glacier counties, Montana. Contacts: For further information about this Final EIS, contact: Ellen Russell, Project Manager,

38

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

39

EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana , Hettinger, North Dakota , and New Underwood , South Dakota , in Custer and Fallon Counties in Montana, Adams , Bowman , and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

40

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed.

Not Available

1993-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental  

Broader source: Energy.gov [DOE]

This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

42

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

43

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

44

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

line. BPA's proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http:www.blm.govordistricts...

45

EA-1595: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor...

46

EA-1679: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Plan EA-1679: Mitigation Action Plan Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington This MAP is for...

47

Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle  

SciTech Connect (OSTI)

The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

Kuz'micheva, K. I.; Merzlyakov, A. S.; Fokin, G. G. [JSC 'R and D Center at Federal Grid Company of the United Power System' (Russian Federation)

2013-05-15T23:59:59.000Z

48

3D Reconstruction of 138 KV Power-lines from Airborne LiDAR Data.  

E-Print Network [OSTI]

??Due to infrequent and imprecise maintenance inspection in power-line corridors, accidents can be caused by interferences, for instance, surrounding trees. Transmission power-line inspection conventionally relies… (more)

Xiang, Qing

2014-01-01T23:59:59.000Z

49

EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

50

Space charge measurements downwind from a monopolar 500 KV HVDC test line  

SciTech Connect (OSTI)

One quantity that helps describe the electrical environment in the vicinity of a HVDC line is space charge, a quantity that consists of charged air ions and charged aerosols. This paper describes measurements made at the Electric Power Research Institute's High Voltage Transmission Research Center (HVTRC) in Lenox, MA to determine the concentration of space charge present downwind of a HVDC test line and the influence of wind on the space charge level. The instrumentation used to make the measurements of space charge downwind of the line is also described.

Carter, P.J.; Johnson, G.B. (General Electric Co., EPRI-High Voltage Transmission, Research Center, Lenox, MA (US))

1988-10-01T23:59:59.000Z

51

EIS-0159: Flatiron-Erie 115-kV Transmission Line  

Broader source: Energy.gov [DOE]

"The Western Area Power Administration proposes to build 27 new wood H-frame structures along the line, to replace or modify 45 of the existing structures and to remove 11 of them."

52

EIS-0399: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE, jointly with the Montana Department of Environmental Quality (MDEQ), prepared an EIS that evaluated the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana.

53

EIS-0078: Jonesboro-Hergett 161-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

54

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

55

EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability.

56

Type A Accident Investigation Report on the June 25, 1997, Contractor Inspector Fatality on the Satsop-Aberdeen #2 & #3 230 kV Line  

Broader source: Energy.gov [DOE]

On June 27, 1997, I established a Type-A Accident Investigation Board to investigate the June 25, 1997 fatal contractor accident which occurred on BPA?s Satsop-Aberdeen #2 and #3 230-kV transmission lines right-of-way.

57

EIS-0301: NRG Energy Services, Inc., Arizona-Baja California 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to approve NRG Energy, Inc. (NRG) for a Presidential permit to construct a 500,000-volt transmission line originating at the switchyard of the Palo Verde Nuclear Generating Station near Phoenix, Arizona, and extending approximately 177 miles to the southwest, where it would cross the United States (U.S.) border with Mexico in the vicinity of Calexico, California.

58

EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE started to prepare, jointly with the Montana Department of Environmental Quality (MDEQ), an EA that would also serve as a state EIS. The document would evaluate the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana. Based on comments received on the DOE Draft EA/MDEQ Draft EIS, DOE cancelled preparation of the EA and announced preparation of DOE/EIS-0399 (of the same title).

59

EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities  

Broader source: Energy.gov [DOE]

The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

60

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

N /A

2000-03-20T23:59:59.000Z

62

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect (OSTI)

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

63

Design studies for the Mead-Phoenix 500 kV AC transmission project  

SciTech Connect (OSTI)

The Mead-Phoenix 500 kV ac line is 243 miles long and runs parallel to the existing Mead-Liberty 345 kV line. This line is planned for 70% series and 70% shunt compensation; it also incorporates the first application of a 50 kV phase shifting transformer that enables a 1,300 MW transmission capacity. This paper presents the design studies that were undertaken in arriving at the equipment ratings and insulation levels that lead to the equipment specifications. The shunt reactor switching requirements utilizing MOV across the breaker, line switching with line connected arresters and the breaker transient recovery voltage are also dealt with in the paper.

Thallam, R.S.; Lundquist, T.G.; Gerlach, D.W. [Salt River Project, Phoenix, AZ (United States)] [Salt River Project, Phoenix, AZ (United States); Atmuri, S.R. [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada)] [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada); Selin, D.A. [Arizona Public Service Co., Phoenix, AZ (United States)] [Arizona Public Service Co., Phoenix, AZ (United States)

1995-10-01T23:59:59.000Z

64

Liberty-Parker No. 2 230-kV transmission line project, La Paz and Maricopa Counties, Arizona: Environmental assessment  

SciTech Connect (OSTI)

The proposed project was not found to have the potential for significant impact on the human environment. The proposed project is essentially a rebuild of an existing transmission line on an existing right-of-way (ROW) through mostly unpopulated open desert. Analysis of the proposed action and its potential effects on various environmental components showed that the project would not significantly affect climate, air quality, noise levels, topography, geology, or soils. No significant impact would occur to vegetation or wildlife as a result of the project. Visual resources will not be significantly affected, as both the existing Liberty-Parker No. 2 Transmission Line and its parallel sister No. 1 line are already present. Land ownership, land use, and socioeconomics will not be significantly affected. No significant cultural resources will be affected by the proposed project. The lines will be constructed on areas previously surveyed for cultural resources and the site density of this region is known to be very low.

Not Available

1986-09-01T23:59:59.000Z

65

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect (OSTI)

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

66

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

Imperial-Mexicali Imperial-Mexicali FEIS S-67 December 2004 TABLE S-3 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human health attributable to permitting each transmission line separately are contained in Sections 4.2, 4.3, and 4.11 of Volume 1 of this EIS, respectively.

67

Towards feature-driven planning of product-line evolution  

Science Journals Connector (OSTI)

Industries that successfully apply product line approaches often operate in markets that are well established and have a strategic perspective. Consequently, such organizations have a tendency towards long-term planning of products and product lines. ... Keywords: evolution, feature modeling, product line engineering

Goetz Botterweck; Andreas Pleuss; Andreas Polzer; Stefan Kowalewski

2009-10-01T23:59:59.000Z

68

On-line Planning Simulation Scott D. Anderson  

E-Print Network [OSTI]

On-line Planning Simulation Scott D. Anderson Spelman College Atlanta, GA 30314-4399 anderson will be satis ed, and so forth. Nevertheless, such evaluation is critical to a scienti c understanding of how

Southern California, University of

69

Power Line Plan of Development Outline | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Power Line Plan of Development OutlineLegal Published NA Year Signed or Took Effect 2005...

70

THE MAXIMUM CAPACITY OF A LINE PLAN IS INAPPROXIMABLE  

E-Print Network [OSTI]

THE MAXIMUM CAPACITY OF A LINE PLAN IS INAPPROXIMABLE CHRISTINA PUHL AND SEBASTIAN STILLER Abstract a network, upper arc-capacities and a line pool. E-mail: puhl@math.tu-berlin.de, stiller of the European Commission under contract no. FP6-021235-2. 1 #12;2 CHRISTINA PUHL AND SEBASTIAN STILLER We

Nabben, Reinhard

71

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

72

Characterization Plan for Soils Around Drain Line PLA-100115  

SciTech Connect (OSTI)

This Characterization Plan supports the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) closure of soils that may have been contaminated by releases from drain line PLA-100115, located within the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The requirements to address the closure of soils contaminated by a potential release from this line in a characterization plan was identified in the "HWMA/RCRA Less Than 90-day Generator Closure Report for the VES-SFE-126."

D. Shanklin

2006-05-24T23:59:59.000Z

73

EIS-0332: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

kV transmission line between Bonneville Power Administration's existing McNary and John Day substations. DOEEIS-0332: Mitigation Action Plan for the McNary-John Day Transmission...

74

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Broader source: Energy.gov (indexed) [DOE]

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

75

Back-to-Back Energization of a 60kV Cable Network -Inrush Currents Phenomenon  

E-Print Network [OSTI]

transmission lines with a rated voltage equal to and below 150kV must be put underground, in order to reduce's energization. Fig. 1. ENV 60kV Network map Fig. 2. Single Line Diagram of the analyzed area The knowledge1 Back-to-Back Energization of a 60kV Cable Network - Inrush Currents Phenomenon F. Faria da Silva

Silva, Filipe Faria Da

76

Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line  

Broader source: Energy.gov [DOE]

On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

77

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network [OSTI]

by the partners in the Colstrip 500 kV transmission lines (Northwestern Energy, Puget Sound Energy, Portland unscheduled electricity flows over transmission lines leading to increased risks to electric systemBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

78

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Broader source: Energy.gov (indexed) [DOE]

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

79

A Markovian model for the hybrid manufacturing planning and control method 'Double Speed Single Production Line'  

Science Journals Connector (OSTI)

In this paper, the hybrid production planning & control method Double Speed Single Production Line (DSSPL) is presented, modelled and its performances evaluated and compared to classical Production Planning and Control methods (PPC). DSSPL combines JIT/kanban ... Keywords: Double Speed Single Production Line, Hybrid manufacturing planning & control method, Industrial case study, Markov processes

Naoufel Cheikhrouhou; Christoph Hachen; Rémy Glardon

2009-10-01T23:59:59.000Z

80

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

SciTech Connect (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

82

EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

83

EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) and the Bureau of Indian Affairs (BIA), as joint lead agencies, are preparing an EA that will evaluate the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to replace the previous 100-foot right-of-way, which has expired.

84

Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and  

Broader source: Energy.gov (indexed) [DOE]

Standard Review Plan Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities August 2013 2 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Preparation for Facility Operations Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation August 2013 3 Table of Contents Objective ......................................................................................................................................... 4 Requirements .................................................................................................................................. 4 Primary References ......................................................................................................................... 6

85

Neutral reactors on shunt compensated EHV lines  

SciTech Connect (OSTI)

This paper examines the applications of a neutral reactor in limiting resonance overvoltages induced on deenergized conductors due to parallel energized circuits and stuck breaker conditions. These applications are demonstrated through the planned 243 mile long Mead-Phoenix 500 kV line running on the same right of way as the existing Mead-Liberty 345 kV line. Reducing the secondary arc current during single pole reclosing is also examined. In addition to its applications, a procedure for sizing, rating and protection of the neutral reactor is explained.

Atmuri, S.R. [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada); Thallam, R.S.; Gerlach, D.W.; Lundquist, T.G. [Salt River Project, Phoenix, AZ (United States); Selin, D.A. [Arizona Public Service Co., Phoenix, AZ (United States)

1994-12-31T23:59:59.000Z

86

AC transmission system planning choosing lines from a discrete set  

E-Print Network [OSTI]

Transmission system planning (TSP) is a difficult nonlinear optimization problem involving non-convex quadratic terms, as well as discrete variables. We extend prior results for linear relaxations, drawing on a preliminary ...

Gilbertson, Eric W.

2013-04-24T23:59:59.000Z

87

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

88

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Broader source: Energy.gov (indexed) [DOE]

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

89

Algorithms for on-line aggregate production plan revision with stochastic autocorrelated demand  

E-Print Network [OSTI]

Tep Sastri (Chair of Committee) J / ' l Dick Simmons (Member) Alberto Garcia. -Diaz ( Xlember ) G. K. Bennett (Head of Department) December 1989 ABSTRACT Algoritlnns for On-line Aggregate Production Plan Rev1sion with Stochastic... Autocorrelated Denrand. (December 1989) Zixuan Ding, B. S. , East China Petroleum University Chair of Advisory Com1nittee: Dr. Tep Sastri Aggregate production plan revision in the environment of autocorrelated stochastic demand is con1plex but. at the sa1ne...

Ding, Zixuan

2012-06-07T23:59:59.000Z

90

EA-1456: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

91

EIS-0128: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

28: Mitigation Action Plan 28: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

92

EIS-0128: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

: Mitigation Action Plan : Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

93

500-kV Central Ferry Substation ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Ferry Substation in Garfield County, Wash., to BPA's 500-kV Lower Monumental Substation in Walla Walla County, Wash. BPA is currently considering two routing...

94

EIS-0128: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

128: Mitigation Action Plan 128: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos-Gates (Path 15) Transmission Project This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Elect, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE/EIS-0128, Western Area Power Administration, Mitigation Action Plan for the Los Banos-Gates (Path 15) Transmission Project (January 2003) More Documents & Publications EIS-0128: Mitigation Action Plan FAQS Gap Analysis Qualification Card - Mechanical Systems

95

EA-1591: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91: Mitigation Action Plan 91: Mitigation Action Plan EA-1591: Mitigation Action Plan Palisades-Goshen Transmission Line Reconstruction Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Mitigation Action Plan for the Palisades-Goshen Transmission Line Reconstruction Project More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan EA-1591: Finding of No Significant Impact

96

Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California  

Broader source: Energy.gov (indexed) [DOE]

Section Page S:\COMM\NEPA\TODO \EA1383\EATOC1 -R.DOC 4/1/02 -i- 1.0 INTRODUCTION 1-1 1.1 BACKGROUND 1-1 1.2 SCOPE OF PROJECT 1-2 1.3 PURPOSE AND NEED 1-3 1.4 AGENCY ACTIONS 1-3 1.4.1 Federal 1-3 1.4.1.1 U.S. Department of Energy 1-3 1.4.1.2 U.S. Fish and Wildlife Service 1-4 1.4.2 Other Agenc y Actions 1-4 1.4.2.1 California Energy Commission 1-4 1.4.2.2 California Department of Fish and Game 1-4 1.4.2.3 State Historic Preservation Office 1-5 1.4.2.4 San Diego County 1-5 2.0 PROPOSED ACTION AND ALTERNATIVES 2-1 2.1 NO ACTION ALTERNATIVE 2-1 2.2 PROPOSED ACTION 2-1 2.2.1 Proposed Amendment to Presidential Permit (PP-68) 2-2 2.2.2 Description of Proposed Project Components and Activities 2-3 2.2.2.1 Otay Mesa 230 kV Switchyard 2-3

97

Buffalo Flat Service 115-KV Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

BPA, in conjunction with Midstate Electric Cooperative (Midstate), proposed to construct two sections of a new 115-kV transmission line in central Oregon: one section from BPA's LaPine Substation to Midstate's Fort Rock Substation (BPA), and the other from Fort Rock Substation to the proposed US Air Force radar transmitter site at Buffalo Flat (Midstate). The proposed line would be a total of about 74 miles long, and of either wood or steel single-pole construction; it would parallel existing corridors and/or roads for much of the distance. 23 refs., 6 figs., 5 tabs.

United States. Bonneville Power Administration.

1987-07-01T23:59:59.000Z

98

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

99

EA-1731: Mitigation Acton Plan | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Mitigation Acton Plan 1: Mitigation Acton Plan EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla Walla-Tucannon River Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 47-mile-long 115-kilovolt (kV) transmission line from the existing Walla Walla Substation, located in the city of Walla Walla, Washington, to the existing Tucannon River Substation, located near the town of Dayton, Washington. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Finding of No Significant Impact EA-1731: Final Environmental Assessment

100

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

102

Radio-Frequency Interference (RFI) From Extra-High-Voltage (EHV) Transmission Lines  

E-Print Network [OSTI]

discharges are a design issue. Extra-high-voltage (EHV) transmission lines have operating voltages of 345 kV building a 345-kV transmission line from Red Hill, NM to Deming, NM which would run east along US60 to its with respect to radio noise: (1) lines with voltages below 70 kV and (2) lines with voltages above 110 kV

Ellingson, Steven W.

103

EA-1636: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

104

220 kV SSSC device for power flow control (Smart Grid Project) | Open  

Open Energy Info (EERE)

kV SSSC device for power flow control (Smart Grid Project) kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location Catalonia, Spain Coordinates 41.59116°, 1.520862° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.59116,"lon":1.520862,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

105

0.4 kV remote control (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

4 kV remote control (Smart Grid Project) 4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

106

14 kV single-phase superconducting fault current limiter based on YBCO films  

Science Journals Connector (OSTI)

We present the fabrication and short circuit test results of a 14 kV single-phase resistive superconducting fault current limiter (SFCL) based on \\{YBa2Cu3O7\\} (YBCO) films. Individual components were processed using the 4? YBCO films and have the rated voltage and current of 600 V and 35 A at 77 K, respectively. Twenty four components, eight components in series and three lines in parallel, make a module having the rated voltage and current of 4.8 kV and 105 A, respectively. Three modules were assembled in series to produce the SFCL working at 77 K, a 14 kV single-phase machine for the 22.9 kV Y–Y grid. short circuit tests were successfully conducted in an accredited test facility with the maximum fault currents up to 14.1 kAP. All components quenched together upon faults and shared the rated voltage evenly without any supplementary device between the modules. This proves that the SFCL based on YBCO films may not only work reliably at 22.9 kV, but also provide technical feasibility for higher voltage application including the transmission grids.

J. Sim; K.B. Park; H.R. Kim; J.S. Kang; B.W. Lee; H.M. Kim; I.S. Oh; O.B. Hyun

2007-01-01T23:59:59.000Z

107

16. Recording of Absarption Spectra (Absorption Accessory kit t (55466); 30 kV; 0.08 mA, room normally  

E-Print Network [OSTI]

16. Recording of Absarption Spectra (Absorption Edge) Accessory kit t (55466); 30 kV; 0.08 mA, room set to 30 kV7 16.4. Tabulate counts, I,from 20° (2 8)to 40' at 1' intervals. Fig. 1 8 1 16.5. Locate ktween the K,- and the Kg-line of copper, so that the transmission rate of the Kg-line is very weak while

Browder, Tom

108

Improvement plans for the RHIC/AGS on-line model environments  

SciTech Connect (OSTI)

The on-line models for Relativistic Ion Collider (RHIC) and the RHIC pre-injectors (the AGS and the AGS Booster) can be thought of as containing our best collective knowledge of these accelerators. As we improve these on-line models we are building the framework to have a sophisticated model-based controls system. Currently the RHIC on-line model is an integral part of the controls system, providing the interface for tune control, chromaticity control, and non-linear chromaticity control. What we discuss in this paper is our vision of the future of the on-line model environment for RHIC and the RHIC preinjectors. Although these on-line models are primarily used as Courant-Snyder parameter calculators using live machine settings, we envision expanding these environments to encompass many other problem domains.

Brown,K.A.; Ahrens, L.; Beebe-Wang, J.; Morris, J.; Nemesure, S.; Robert-Demolaize, G.; Satogata, T.; Schoefer, V.; Tepikian, S.

2009-08-31T23:59:59.000Z

109

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

110

Is planning failing? : the impacts of decision making processes on the Green Line Extension  

E-Print Network [OSTI]

Research was conducted on the proposed Green Line Extension, a light rail corridor from Cambridge through Somerville and Medford, Massachusetts. The project is being undertaken by the Massachusetts Executive Office of ...

Ciborowski, Matthew A

2009-01-01T23:59:59.000Z

111

Second Line of Defense Megaports Initiative Sustainment Plan - Port Klang Malaysia  

SciTech Connect (OSTI)

To reduce the risk of illicit trafficking of special nuclear and other radiological materials, the Megaports Initiative installs radiation detection systems at international seaports. Port Klang, Malaysia, is one such seaport identified by the Megaports Initiative as a key area to install equipment to accomplish the mission of preventing the acquisition and smuggling of materials that could be used to create weapons of mass destruction or radiological dispersal devices. Sustainability is a critical factor of all components of the Megaports Initiative. The sustainability plan is developed to assist the partner country in securing the technical, financial, and policy commitments required to develop and implement a country-specific strategy. A robust sustainability plan will define the long-term relationship between the U.S. Department of Energy and the Government of Malaysia as well as promote the ongoing proficient radiation detection system operations at Port Klang, Malaysia.

King, Curtis A.

2009-09-29T23:59:59.000Z

112

Vibration Proof Construction of 1000kV Electron Microscope  

Science Journals Connector (OSTI)

......University Press 1970 other ORIGINAL Vibration Proof Construction of 1000kV Electron...with the center of gravity. That is, a vibration proof hanging console was made as a method...protecting a 1000kV Electron Microscope from vibration, and this allowed the whole instrument......

Yoshio SAKITANI; Susumu OZASA

1970-01-01T23:59:59.000Z

113

Reliability of lightning resistant overhead distribution lines  

SciTech Connect (OSTI)

An assessment of the 32 year historical reliability of the 13.8 kV electrical distribution system at the Oak Ridge National Laboratory (ORNL) in Tennessee has yielded several conclusions useful In the planning of Industrial power Systems. The system configuration at ORNL has essentially remained unchanged in the last 32 years which allows a meaningful comparison of reliability trends for the plant`s eight overhead distribution lines, two of which were built in the 1960`s with lightning resistant construction techniques. Meticulous records indicating the cause, duration, and location of 135 electric outages in the plant`s distribution system have allowed a reliability assessment to be performed. The assessment clearly shows how differences in voltage construction class, length, age, and maximum elevation above a reference elevation influence the reliability of overhead power distribution lines. Comparisons are also made between the ORNL historical data and predicted failure rates from ANSI and IEEE industry surveys.

Tolbert, L.M.; Cleveland, J.T.; Degenhardt, L.J.

1995-04-01T23:59:59.000Z

114

Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan Colon Container Terminal (CCT) Panama  

SciTech Connect (OSTI)

Report on the Operational Testing and Evaluation to validate and baseline an operable system that meets the Second Line of Defense (SLD) mission requirements. An SLD system is defined as the detection technology and associated equipment, the system operators from the host country, the standard operating procedures (SOPs), and other elements such as training and maintenance which support long-term system sustainment. To this end, the activities conducted during the OT&E phase must demonstrate that the Megaports System can be operated effectively in real-time by Panama Direccion General de Aduanas (DGA Panama Customs) personnel to the standards of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA).

Newhouse, Robert N.

2010-01-01T23:59:59.000Z

115

A frequency domain model for 3 kV dc traction dc-side resonance identification  

SciTech Connect (OSTI)

Frequency-dependent effects in railway traction power systems arise from the impedance of substation and locomotive line filters and the traction line. Harmonic noise from traction drives and substations can excite resonances and produce overcurrent or overvoltage conditions at critical points in the network. In this paper, the harmonic feeding impedances of a 3 kV DC traction system seen from the rectifier substation, locomotive drive converter and pantograph terminals are presented. Several substation and locomotive filters are considered with a frequency-dependent traction line. Resonances attributed to the substation filter, locomotive filter and traction line are separate and distinct, the line introducing poles and zeros in the audio frequency (AF) range which vary in frequency and magnitude with locomotive position.

Hill, R.J. [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering] [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering; Fracchia, M.; Pozzobon, P.; Sciutto, G. [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica] [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica

1995-08-01T23:59:59.000Z

116

BE 400/18 kV Substation Renovation Project  

E-Print Network [OSTI]

The 400/18 kV SPS main substation was designed for the 400 GeV SPS project and was commissioned in 1974. It has been upgraded several times to form the present 400/66/18 kV SPS and LEP transmission power comprising 490 MVA and 240 MVAR installed power. The beginning of the LHC project and the obsolescence of the main elements, and consequently limited reliability, made it necessary to begin a complete renovation program. The new configuration of the substation will integrate the new compensator of reactive power efficiently into the 18 kV pulsed network. In this way the new compensator will facilitate the functioning of the pulsed network with the new loads and it will improve the performance of the electrical substation. The renovation program consists in a global reorganisation of the substation, with the total replacement of the 18 kV power equipment, a set up of new control and protection systems for the 18 kV and 400 kV section and the reconditioning of all the 400 kV equipment.

Vairo, Antonio

2001-01-01T23:59:59.000Z

117

Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica  

SciTech Connect (OSTI)

Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica was written for the Second Line of Defense Megaports Initiative. The purpose of the Operational Testing and Evaluation (OT&E) phase of the project is to prepare for turnover of the Megaports system supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) located at the Kingston Container Terminal (KCT) of the Port of Kingston, Jamaica to the Government of Jamaica (GOJ). Activities conducted during the OT&E phase must demonstrate that the Megaports system can be operated effectively in real time by Jamaica Customs and KCT personnel to the satisfaction of the DOE/NNSA. These activities will also determine if the Megaports system, as installed and accepted, is performing according to the Megaports Program objectives such that the system is capable of executing the mission of the Second Line of Defense Megaports Initiative. The OT&E phase of the project also provides an opportunity to consider potential improvements to the system and to take remedial action if performance deficiencies are identified during the course of evaluation. Changes to the system should be considered under an appropriate change-control process. DOE/NNSA will determine that OT&E is complete by examining whether the Megaports system is performing as intended and that the GOJ is fully capable of operating the system independently without continued onsite support from the U.S. team.

Deforest, Thomas J.; VanDyke, Damon S.

2012-03-01T23:59:59.000Z

118

Author's Copy: J.B. Bancroft, A. Morrison, G. Lachapelle, Validation of GNSS under 500,000 V Direct Current (DC) transmission lines, Computers and Electronics in Agriculture, Volume 83, April 2012, Pages 58-67, ISSN 0168-1699, 10.1016/j.compag.2012.01.013  

E-Print Network [OSTI]

masking by the towers. Tests were conducted under a set of three transmission lines, two 500 kV DC lines and one 230 kV AC line. Several GNSS receivers and processing methods, including real time and post provides an in depth analysis of GNSS receivers tracking and navigation performance beneath 500 kV DC lines

Calgary, University of

119

Microsoft Word - Mitigation Action Plan master.doc  

Broader source: Energy.gov (indexed) [DOE]

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project DOE/EA-1591 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. This MAP is for the Proposed Action and includes all integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. No impacts reached the level to be considered significant even without these mitigation measures.

120

KvH Projekt GmbH Co KG | Open Energy Information  

Open Energy Info (EERE)

KvH Projekt GmbH Co KG KvH Projekt GmbH Co KG Jump to: navigation, search Name KvH Projekt GmbH & Co KG Place Hamburg, Germany Zip D-20259 Sector Biomass, Solar, Wind energy Product Project developer in wind, solar, biomass and smart architecture. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Microsoft PowerPoint - FY12 RMR - CRSP TRANSMISSION PLANNING MEETING_Final.PPT [Compatibility Mode]  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TRANSMISSION TRANSMISSION PLANNING MEETING PLANNING MEETING December 6, 2011 December 6, 2011 1 Agenda g Introductions CRSP North (Loveland) Program CRSP South (Phoenix) Program CRSP South (Phoenix) Program Open Forum 2 CRSP North (Loveland) ( ) Capital Program Transmission Lines Substations Communications Communications Control, Protection and Metering M bil & H E i t Mobile & Heavy Equipment Programmatic Improvements 3 Transmission Lines Line Equipment Replacements 50k in FY12 & every year after Pleasant View 24.9-kV Line Replacement Estimated Project Cost (EPC) $ 1,000k FY15 $200K FY16 $800K 4 Substations Annual Equipment Replacement Program Substation Test Equipment Combined all test equipment categories under movable property, "Test Equipment Replacements"

122

Grounding-line migration in plan-view marine ice-sheet models: results of the ice2sea MISMIP3d intercomparison  

E-Print Network [OSTI]

Grounding-line migration in plan-view marine ice-sheet models: results of the ice2sea MISMIP3d Wegener Institute for Polar and Marine Research, Bremerhaven, Germany 13 Institut fu¨r Mathematik, Freie Universita¨t Berlin, Berlin, Germany 14 Jet Propulsion Laboratory, California Institute of Technology

Huybrechts, Philippe

123

Análise metodológica para a conversão de linhas de distribuição de 34,5 KV para 69 KV.  

E-Print Network [OSTI]

??Este trabalho visa apresentar uma análise metodológica para viabilizar a realização da repotenciação, elevando a classe de tensão de linhas de distribuição de 34,5 kV… (more)

Patrick Santos de Oliveira

2011-01-01T23:59:59.000Z

124

Blythe-Knob\t161-kV\tTransmission\tLine  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Blythe-Knob 161-kV Transmission Line Maintenance Project - Continuation Sheet Project Description (continued) The proposed project also includes vegetation management in one...

125

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Broader source: Energy.gov (indexed) [DOE]

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

126

New Imperial Valley power line  

SciTech Connect (OSTI)

The Imperial Irrigation District placed its new 104-mile, 230kV transmission line in service in the Imperial Valley on September 14, 1988. The power line, with a rated capacity of 600 megawatts, transmits electricity generated at geothermal power plants. The transmission line was financed by 14 geothermal companies, whose participation was based on the amount of line-capacity they expect to use.

Not Available

1988-12-01T23:59:59.000Z

127

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Description New 500 kV substation into Southwest PowerlinkLine Expand Midpoint Substation and construct thirdto Kramer Jct. and Lugo Substation 2010 20% RPS target with

Mills, Andrew D.

2009-01-01T23:59:59.000Z

128

69 kV shunt capacitor bank specification considerations  

SciTech Connect (OSTI)

PSI has standardized on the 69 kv ungrounded star, 7.2 mvar or multiple of the 7.2 mvar shunt capacitor bank for var control. This document defines the considerations to be addressed when specifying a 69 kv ungrounded capacitor bank and for providing suitable protection. The design goal is to provide a bank that is reliable and meets operational requirements at minimum cost with standard components. The bank components will be discussed separately. This paper defines the considerations for specifying capacitor banks to minimize cost, improve reliability and help standardize design. The components making up the bank will be individually discussed with special emphasis on the protection and control.

Fenner, G.E. (PSI Energy, Inc., Plainfield, IN (US))

1992-01-01T23:59:59.000Z

129

1 INTRODUCTION We consider network protection (NP) by line switch-  

E-Print Network [OSTI]

framework applied to a realistic case study, i.e. the Italian 380kV power transmission grid, are summa as a network of N nodes (substations or buses) and K edges (transmission lines). Two types of buses that minimizes the consequences of cascading failures on an electrical grid. The 380 kV Italian power

Paris-Sud XI, Université de

130

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

131

Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

132

Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks  

SciTech Connect (OSTI)

An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S. [Electric Power Research Institute (VNIIE) (Russian Federation)

2006-11-15T23:59:59.000Z

133

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

134

Environmental Assessment of Proposed Haskill Substation and Tap Line.  

SciTech Connect (OSTI)

To solve the service problems in the Marion area, BPA is proposing to construct a new 230/24.9-kV substation to tap BPA's existing Libby-Conkelly 230-kV line (different than Hot Springs-Conkelly 230-kV line, but an equally acceptable source). Haskill Substation would be approximately one mile northeast of the town of Marion, Montana, and would serve the western portion of Flathead Electric Cooperative's service area. This report describes possible environmental impacts of the proposed action. 8 refs., 4 figs.

Not Available

1984-05-01T23:59:59.000Z

135

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements"  

Broader source: Energy.gov (indexed) [DOE]

Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements" "Bonneville Power Administration Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities Environmental Impact Statements" "application/vnd.ms-excel" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"I-5 Corridor Reinforcement Project Cowlitz and Clark Counties, WA and Multnomah County, OR",5000000,"Determination Date:","application/vnd.ms-excel"," Construct about 70 miles of new 500-kV line between a new proposed substation near Castle Rock, WA and an exsting BPA substation in Troutdale, OR"

136

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

137

Second Line of Defense, Port of Buenos Aires and Exolgan Container Terminal Operational Testing and Evaluation Plan, Buenos Aires, Argentina  

SciTech Connect (OSTI)

The Office of the Second Line of Defense (SLD) Megaports project team for Argentina will conduct operational testing and evaluation (OT&E) at Exolgan Container Terminal at the Port of Dock Sud from July 16-20, 2012; and at the Port of Buenos Aires from September 3-7, 2012. SLD is installing radiation detection equipment to screen export, import, and transshipment containers at these locations. The purpose of OT&E is to validate and baseline an operable system that meets the SLD mission and to ensure the system continues to perform as expected in an operational environment with Argentina Customs effectively adjudicating alarms.

Roberts, Bryan W.

2012-08-23T23:59:59.000Z

138

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

139

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

140

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Broader source: Energy.gov (indexed) [DOE]

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Rural community noise caused by 345/138 kV substation transformer  

Science Journals Connector (OSTI)

Residents 360 m (1200 ft) from a large (6 × 8 × 4.5 m high) 345/138 kV transformer installed in a new power substation in a rural setting complained of its noise emission especially at night. Octave band and 24?h A?weighted noise measurements were made. The 120?Hz sound level was found to be 90 to 105 dB at the transformer surface. Transformer noise emission did not vary significantly with transformer loading or time of day. The distant (360 m) noise level was from 40 to 47 dBA (N?30 to N?45) depending on intervening terrain and time of day. In calm summer air the annoying sound was found to be in the 125?Hz band at the residence beyond a vegitated rise and 250 to 500 Hz for a residence with line?of?sight contact over a shallow depression. The line?of?sight resident's complaint that the noise was greatest at night was corroborated by the 24?h measurement. That noise level was found to be typically 38 dBA from 11 a.m. to 7 p.m. and 45 dBA from 9 p.m. to 6 a.m. It is postulated that the depression accumulated cool air at night thus refracting the sound onto that site. Recommendations for a noise barrier wall was made to the power company operator.

Angelo J. Campanella

1981-01-01T23:59:59.000Z

142

EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental  

Broader source: Energy.gov [DOE]

This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

143

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

Court Orders Court Orders Imperial-Mexicali DEIS A-1 May 2004 APPENDIX A: COURT ORDERS Court Orders Imperial-Mexicali DEIS A-2 May 2004 Court Orders Imperial-Mexicali DEIS A-3 May 2004 APPENDIX A: COURT ORDERS This appendix contains the court orders issued on May 2, 2003, and July 8, 2003, by the United States District Court, Southern District of California (Case No. 02-CV-513-IEG (POR)), in the case of the Border Power Plant Working Group versus the U.S. Department of Energy and the Bureau of Land Management. Court Orders Imperial-Mexicali DEIS A-4 May 2004 Court Orders Imperial-Mexicali DEIS A-5 May 2004 Court Orders Imperial-Mexicali DEIS A-6 May 2004 Court Orders Imperial-Mexicali DEIS A-7 May 2004 Court Orders Imperial-Mexicali DEIS A-8 May 2004 Court Orders Imperial-Mexicali DEIS A-9 May 2004

144

Environmental Assessment for the USK Loop Line 230 kV Transmission Project.  

SciTech Connect (OSTI)

This Environmental Assessment (EA) covers the transmission/substation facilities that would be constructed or modified. It has been prepared by an interdisciplinary team, as well as through consultation on the Federal, state and local levels. It is subject to a 60-day review by the general public and other agencies and will generally coincide with the release of the final state EIS. This EA presents an expansion of those transmission-related discussions in the state EIS where BPA could undertake their construction or modifiction.

United States. Bonneville Power Administration.

1985-09-01T23:59:59.000Z

145

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...  

Office of Environmental Management (EM)

of the following ways: Online at: http:www.blm.govordistrictsspokaneplansvph230.php. By email to: blmorvantagepomona@blm.gov (please specify Vantage to Pomona Heights...

146

EIS-0100: Liberty-Coolidge 230-kV Transmission Line, Arizona  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with an upgrade of electrical transmission capability between the Liberty and Coolidge Substations.

147

EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

148

Design and fault analysis of a 345KV 220 mile overhead transmission line.  

E-Print Network [OSTI]

??Efficient and reliable transmission of bulk power economically benefits both the power company and consumer. This report gives clarification to concept and procedure in design… (more)

Clawson, Greg

2012-01-01T23:59:59.000Z

149

Aalborg Universitet Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems  

E-Print Network [OSTI]

system transients, transmission cable systems, protection and HVDC-VSC. E-mail: clb@et.aau.dk. desired

Bak, Claus Leth

150

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

151

150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION  

E-Print Network [OSTI]

a zero failure rate. That SCR's may be connected in series120 kV operating systems. That a SCR switched capacitor bank21 Franck, J. V. , et al. , "An SCR Sedes Switch and Impulse

Owren, H.

2011-01-01T23:59:59.000Z

152

ZigBee Performance in 400 KV Air Insulated Power Substation  

Science Journals Connector (OSTI)

An experimental assessment of the impact of the electromagnetic environment of a 400 kV substation on the performance of ZigBee equipment is ... the performance of ZigBee equipment deployed in the substation with...

Qingshan Shan; I A Glover; P J Moore…

2010-01-01T23:59:59.000Z

153

Development of a 220 kV/300 MVA superconductive fault current limiter  

Science Journals Connector (OSTI)

After we developed a saturated iron core type 35 kV/90 MVA superconductive fault current limiter and installed the device in a transmission network at Puji substation of China Southern Power Grid for live-grid operation in 2007, we continued our efforts in advancing this technology. A 220 kV/300 MVA device has been designed, manufactured and factory tested. This device differs from the 35 kV device in its form of electrical insulation even though the two devices have the same working principle and similar core structure. Improvements in the dc magnetization circuit and the cryogenic system were also achieved. This 220 kV/300 MVA superconductive fault current limiter has been installed and has passed all field tests at Shigezhuang substation in Tianjin, China. Trial operation is underway. This paper introduces the major design parameters, key functional specifications and some testing results of the device.

Y Xin; W Z Gong; H Hong; Y Q Gao; X Y Niu; J Y Zhang; Y W Sun; A L Ren; H Z Wang; L F Zhang; Q Li; Z Q Wei; L Z Wang; J B Cui; G J Niu; Z Q Xiong

2012-01-01T23:59:59.000Z

154

ESS 2012 Peer Review - 6.5 kV Silicon Carbide Half-Bridge Power...  

Broader source: Energy.gov (indexed) [DOE]

a 5 kV DC-Link voltage which will greatly impact Storage Systems by reducing costs of power conversion stages Impact current system designs as well as create a platform for...

155

Transmission planning for Indian power grid: a mixed integer programming approachp  

E-Print Network [OSTI]

) time-block (peak, intermediate, base) l index for transmission line voltage level (400, 220 and 132 kV transmission line, Rs/km LCAP power carrying capacity of an inter-state tie line for a particular voltage class, MW LF transmission loss factor per unit power transfer per km line length, MWh/MWh- km LGTH length

Dragoti-Ã?ela, Eranda

156

A 25 KV/10A PULSER FOR DRIVING A HIGH-POWER PIERCE ELECTRON GUN  

E-Print Network [OSTI]

A 25 KV/10A PULSER FOR DRIVING A HIGH-POWER PIERCE ELECTRON GUN J. J. Barroso, J. O. Rossi, H-tube pulser to drive a high-power electron gun. The tube includes a 2.0µF/100kV capacitor bank whose discharge is controlled by a tetrode tube connected to the gun cathode. Typical measured operating parameters are 3

157

EA-1891: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No...

158

Exposure to transmission line electric fields during farming operations  

SciTech Connect (OSTI)

This paper describes an analysis of exposure to transmission line electric fields during typical farming operations. This analysis makes use of experimentally determined ''activity factors'' and time budget information for typical farms as compiled by the U.S. Department of Agriculture. A detailed exposure assessment for 18 ''typical farms'' (as defined by USDA) is provided for a base case 345 kV design. Exposure estimates for transmission lines ranging from 115-765 kV are provided for a representative farm.

Silva, M.; Huber, D.

1985-09-01T23:59:59.000Z

159

Blythe-Knob\t161-kV\tTransmission\tLine Cross\tArm\tReplacements\t...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 Blythe-Knob 161-kV Transmission Line Cross Arm Replacements - Continuation Sheet Project Description (continued) The wood cross arms on a number of wood H-frame structures have...

160

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

An objective approach for selecting ice or wet–snow design loads on transmission lines  

Science Journals Connector (OSTI)

...assessing iceloads for a transmission-line route in southern Norway...wet-snow loads along a transmission-line route, it will be useful...Figure 9. The 420 kV transmission line from Kristiansand to Holen. The nal route follows the alternatives...

2000-01-01T23:59:59.000Z

162

CRAD, Communications Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment Plan CRAD, Communications Assessment Plan Performance Objective: Lines of authority are clearly defined with clear and open communications existing between...

163

High reliability low jitter 80 kV pulse generator  

Science Journals Connector (OSTI)

Switching can be considered to be the essence of pulsed power. Time accurate switch/trigger systems with low inductance are useful in many applications. This article describes a unique switch geometry coupled with a low-inductance capacitive energy store. The system provides a fast-rising high voltage pulse into a low impedance load. It can be challenging to generate high voltage (more than 50 kilovolts) into impedances less than 10???, from a low voltage control signal with a fast rise time and high temporal accuracy. The required power amplification is large, and is usually accomplished with multiple stages. The multiple stages can adversely affect the temporal accuracy and the reliability of the system. In the present application, a highly reliable and low jitter trigger generator was required for the Z pulsed-power facility [M.?E. Savage, L.?F. Bennett, D.?E. Bliss, W.?T. Clark, R.?S. Coats,J.?M. Elizondo, K.?R. LeChien, H.?C. Harjes, J.?M. Lehr, J.?E. Maenchen, D.?H. McDaniel, M.?F. Pasik, T.?D. Pointon, A.?C. Owen, D.?B. Seidel, D.?L. Smith, B.?S. Stoltzfus, K.?W. Struve, W.?A. Stygar, L.?K. Warne, and J.?R. Woodworth, 2007 IEEE Pulsed Power Conference, Albuquerque, NM (IEEE, Piscataway, NJ, 2007), p. 979]. The large investment in each Z experiment demands low prefire probability and low jitter simultaneously. The system described here is based on a 100 kV DC-charged high-pressure spark gap, triggered with an ultraviolet laser. The system uses a single optical path for simultaneously triggering two parallel switches, allowing lower inductance and electrode erosion with a simple optical system. Performance of the system includes 6 ns output rise time into 5.6???, 550 ps one-sigma jitter measured from the 5 V trigger to the high voltage output, and misfire probability less than 10-4. The design of the system and some key measurements will be shown in the paper. We will discuss the design goals related to high reliability and low jitter. While reliability is usually important, and is coupled with jitter, reliability is seldom given more than a qualitative analysis (if any at all). We will show how reliability of the system was calculated, and results of a jitter-reliability tradeoff study. We will describe the behavior of sulfur hexafluoride as the insulating gas in the mildly nonuniform field geometry at pressures of 300 to 500 kPa. We will show the resistance of the arc channels, and show the performance comparisons with normal two-channel operation, and single channel operation.

M. E. Savage and B. S. Stoltzfus

2009-08-27T23:59:59.000Z

164

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plan science-innovationassetsimagesicon-science.jpg Strategic Plan x Strategic Plan Los Alamos National Laboratory Strategic Plan - 2014 (pdf) Our Strategic Plan...

165

A distributed on-line HV transmission condition monitoring information system  

SciTech Connect (OSTI)

China Light and Power Company Ltd. (CLP) is responsible for supplying electricity to the whole of Hong Kong except Hong Kong Island and Lamma Island. In CLP`s Castle Peak power plant, 19 kV and 23 kV electric supplies are generated. The voltage is then stepped up to 400 kV for transmission. The intermediate control between those transformers and the major 400 kV overhead transmission system lies with a standard One and a half Breaker Configuration switch substations. The substation houses single phase encapsulated SF{sub 6} circuit breakers. In the urban centers, 400 kV substations are installed to step down 400 kV to 132 kV or further to 11 kV for distribution. This paper describes the development of a on-line distributed information system for monitoring the conditions of the whole HV transmission system. The system continuously monitors status of each circuit breaker (CB) together with important operational parameters, such as duration during making and breaking, operations of hydraulic pumps and SF{sub 6} gas pressure etc. Each group of CBs is monitored by a standalone microcontroller using a local area network with a baud rate of 9,600. The information can be recorded on the harddisk of an on-site microcomputer and further transmitted back to a remote computer for alarm generation and multi-station supervision. The CLP 400 kV substation and the Tsz Wan Shan 400 kV substation are among the first targets for development.

Chan, W.L. [Hong Kong Polytechnic Univ., Kowloon (Hong Kong)] [Hong Kong Polytechnic Univ., Kowloon (Hong Kong); Pang, S.L.; Chan, T.M. [China Light and Power Co. Ltd., Hong Kong (Hong Kong)] [China Light and Power Co. Ltd., Hong Kong (Hong Kong); So, A.T.P. [City Univ. of Hong Kong, Kowloon (Hong Kong)] [City Univ. of Hong Kong, Kowloon (Hong Kong)

1997-04-01T23:59:59.000Z

166

Evaluation of first 10-kV optical ETO thyristor operating without any low-voltage control bias  

E-Print Network [OSTI]

unlike any existing ETO (or even IGCT/MTO/GTO devices) is reported at 10 kV using the Silvaco TCAD suite

Mazumder, Sudip K.

167

Microsoft Word - CX-Alvey 500 kV Fencing_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Hamid Habibi Project Manager - TESF-CSB Proposed Action: Replace existing posts and fencing around Alvey Substation 500-kV switch yard. PP&A Project No.: 1 632 Budget Information: Work Order: 00250208 Task: 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.11 Installation of fencing, including that for border marking that will not adversely affect wildlife movements or surface water flow. Location: The proposed project is located in Lane County, Oregon at the Bonneville Power Administration (BPA) Alvey substation around the 500-kV switch yard. Proposed by: BPA Description of the Proposed Action: The project involves replacement of the existing fence and fence posts for the 500-kV yard at the

168

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison  

SciTech Connect (OSTI)

Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

Kelley, Nathan; Corsaro, Pietro

2004-12-01T23:59:59.000Z

169

Development of a thyristor valve for next generation 500kV HVDC transmission systems  

SciTech Connect (OSTI)

A high voltage thyristor valve is the basic component of an HVDC transmission system. Development of a 500kV valve for next generation HVDC transmission systems is described. First, the power loss of the valve is analyzed to decide a reasonable wafer size for the light triggered thyristor. From these results, a six inch diameter wafer size is selected. The light triggered thyristor, with ratings of 8kV and 3.5kA, is developed using the six inch wafer. The designing of the valve employing the thyristor and test results with the prototype valve prove that a 500kV valve can be realized by the design method.

Hasegawa, T. [Kansai Electric Power Co., Inc., Osaka (Japan)] [Kansai Electric Power Co., Inc., Osaka (Japan); Yamaji, K. [Shikoku Electric Power Co., Inc., Takamatsu (Japan)] [Shikoku Electric Power Co., Inc., Takamatsu (Japan); Irokawa, H. [Electric Power Development Co., Ltd., Tokyo (Japan)] [Electric Power Development Co., Ltd., Tokyo (Japan); Shirahama, H.; Tanaka, C.; Akabane, K.

1996-10-01T23:59:59.000Z

170

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

171

Consideration of 34. 5 KV as an in-plant voltage for a large industrial user  

SciTech Connect (OSTI)

Traditionally, the in-plant distribution voltage for a large refinery or petrochemical complex has been 13.8 kV. Selection of this voltage level was dictated primarily by economic factors, simply because in most cases the magnitude of the loads or the lengths of the feeders did not produce sufficient savings to compensate for the costlier higher voltage switchgear. This paper presents some engineering and cost considerations for distribution at 34.5 kV and attempts to show that this voltage level is both economically and technically feasible for large electrical systems.

Niculescu, T.D.; Regan, R.R.

1983-09-01T23:59:59.000Z

172

SUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505  

E-Print Network [OSTI]

to pay for such coverage. Review this summary plan description and the documents governing the planSUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505] Plan Type: Group Vision Insurance Plan Year: July 1 ­ June 30 Employer\\Policyholder\\Plan Administrator\\Plan Sponsor: Medical College

173

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

174

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

175

Recreation of Neuronal Kv1 Channel Oligomers by Expression in Mammalian Cells Using Semliki Forest Virus  

Science Journals Connector (OSTI)

The multiple roles of voltage-sensitive K+ channels (Kv1 subfamily) in brain are served by subtypes containing pore-forming ? (1.1?1.6) and auxiliary ? subunits, usually in an (?)4(?)4 stoichiometry. To facilitate structure/activity analysis, combinations ...

Oleg Shamotienko; Sobia Akhtar; Christina Sidera; Frédéric A. Meunier; Barbara Ink; Malcolm Weir; J. Oliver Dolly

1999-12-01T23:59:59.000Z

176

Analysis on heat loss characteristics of a 10 kV HTS power substation  

Science Journals Connector (OSTI)

Abstract A 10 kV High Temperature Superconducting power substation (10 kV HTS substation), supported by Chinese State 863 projects, was developed and has been running to supply power for several factories for more than two years at an industrial park of Baiyin, Gansu province in Northwest China. The system of the 10 kV HTS substation compositions, including a HTS cable, a HTS transformer, a SFCL, and a SMES, are introduced. The SMES works at liquid helium temperature and the other three apparatus operates under liquid nitrogen condition. There are mainly four types of heat losses existing in each HTS apparatus of the 10 kV HTS substation, including AC loss, Joule heat loss, conductive heat, and leak-in heat from cryostat. A small quantity of AC loss still exists due to the harmonic component of the current when it carries DC for HTS apparatus. The principle and basis for analysis of the heat losses are introduced and the total heat loss of each apparatus are calculated or estimated, which agree well with the test result. The analysis and result presented are of importance for the design of the refrigeration system.

Yuping Teng; Shaotao Dai; Naihao Song; Jingye Zhang; Zhiyuan Gao; Zhiqin Zhu; Weiwei Zhou; Zhourong Wei; Liangzhen Lin; Liye Xiao

2014-01-01T23:59:59.000Z

177

Special design and testing aspects of the 345 kV East Fishkill substation  

SciTech Connect (OSTI)

The installation of two 135 MVAR capacitor banks in the 345 kV East Fishkill substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. This paper describes the design of the substation and the tests performed before commissioning the capacitor banks.

Fogarty, R.P.; Halleran, T.M.; Laskowski, L.M.; Mark, D.A. (Consolidated Edison Co. of New York, Inc., New York, NY (United States))

1992-10-01T23:59:59.000Z

178

A source of reactive power at a 35-kV substation of the Vankor oilfield  

Science Journals Connector (OSTI)

An SRP-35/10/10 source of reactive power based on a magnetically controlled RTMU-10000/35-UHL1-series shunt reactor and a capacitor bank rated at 10 MV A at voltage 35 kV is described in this work. It was put int...

B. I. Bazylev; M. A. Bryantsev; S. V. Dyagileva…

2012-03-01T23:59:59.000Z

179

A charge-pump 60kV modulator for the ISOLDE target extraction voltage  

E-Print Network [OSTI]

The ISOLDE facility at CERN provides radioactive ion beams to a number of experimental stations. These ions are produced by a metal target, floating at 60 kV, which is impacted by a 1.4 GeV high intensity proton beam. The ions are then accelerated by a grounded extraction electrode to 60 keV, before transport to the experimental area. During proton beam impact extremely high ionisation of the volume around the target gives rise to significant leakage current which results in loss of charge on the effective target capacitance of approximately 6 nF. If short life-time isotopes are to be studied, the 60 kV must be re-established within a maximum of 10 ms. Recharging the target capacitance to 60 kV and to the required stability of better than 10-4 precludes a direct charging system and an alternative method of re-establishing the 60 kV is used. The present system [1], in operation since 1991, employs a resonant circuit which is triggered 35 µs prior to beam impact. This circuit transfers the charge on the effec...

Barlow, R A; Fowler, A; Gaudillet, H; Gharsa, T; Schipper, J

2015-01-01T23:59:59.000Z

180

DOE/EA-1611: Mitigation Action Plan for the Colorado Highlands Wind Project, Logan County, Colorado (01/19/09)  

Broader source: Energy.gov (indexed) [DOE]

January 19, 2009 January 19, 2009 Mitigation Action Plan Colorado Highlands Wind Project Logan County, Colorado Project Overview. Western Area Power Administration (Western) a power marketing agency of the U.S. Department of Energy (DOE) proposes to approve interconnection of the Project with Western's transmission system and the connected action of the Project. Colorado Highlands Wind LLC (CHWP) applied (via predecessor project owner Wind Energy Prototypes) to Western to interconnect a 90-megawatt (MW) wind power facility with Western's existing Sterling-Frenchman Creek 115-kV transmission line. Approval of the Interconnection Agreement would allow the Project to interconnect with Western's proposed Wildhorse Creek Switchyard. In accordance with the DOE NEPA

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Plasma Immersion Ion Implantation with a 4kV/10kHz Compact High Voltage Pulser  

SciTech Connect (OSTI)

Development of a 4 kV/10 kHz Compact High Voltage Pulser and its application to nitrogen plasma immersion ion implantation (PIII) of different materials as Si, Al alloys, SS304 stainless steel and Ti alloys are discussed. Low voltage (1-5 kV) pulses at high frequencies (up to 20 kHz for 2 kV) were obtained with maximum power delivered at 5 kV, 7 kHz. These conditions were not sufficient to reach temperatures above 200 deg. C in the samples because of short duration of the pulses. However, very shallow implantations of nitrogen in Si, Al5052, SS304 were observed by Auger electron spectroscopy and improved corrosion resistance was obtained for Al5052 when it was treated by nitrogen PIII at 2.5 kV, 5{mu}s and 5 kHz pulses.

Ueda, M.; Oliveira, R. M.; Rossi, J. O. [Associated Laboratory of Plasma, National Institute for Space Research, Av. dos Astronautas 1758, Sao Jose dos Campos, Sao Paulo (Brazil); Reuther, H. [Institute of Ion Beam Physics and Materials Research, Rossendorf, Dresden (Germany); Silva, G. [Associated Laboratory of Plasma, National Institute for Space Research, Av. dos Astronautas 1758, Sao Jose dos Campos, Sao Paulo (Brazil); Department of Aeronautics and Mechanics, Technological Institute of Aeronautics, Sao Jose dos Campos, Sao Paulo (Brazil)

2006-11-13T23:59:59.000Z

182

Combined kV and MV imaging for real-time tracking of implanted fiducial markers  

SciTech Connect (OSTI)

In the presence of intrafraction organ motion, target localization uncertainty can greatly hamper the advantage of highly conformal dose techniques such as intensity modulated radiation therapy (IMRT). To minimize the adverse dosimetric effect caused by tumor motion, a real-time knowledge of the tumor position is required throughout the beam delivery process. The recent integration of onboard kV diagnostic imaging together with MV electronic portal imaging devices on linear accelerators can allow for real-time three-dimensional (3D) tumor position monitoring during a treatment delivery. The aim of this study is to demonstrate a near real-time 3D internal fiducial tracking system based on the combined use of kV and MV imaging. A commercially available radiotherapy system equipped with both kV and MV imaging systems was used in this work. A hardware video frame grabber was used to capture both kV and MV video streams simultaneously through independent video channels at 30 frames per second. The fiducial locations were extracted from the kV and MV images using a software tool. The geometric tracking capabilities of the system were evaluated using a pelvic phantom with embedded fiducials placed on a moveable stage. The maximum tracking speed of the kV/MV system is approximately 9 Hz, which is primarily limited by the frame rate of the MV imager. The geometric accuracy of the system is found to be on the order of less than 1 mm in all three spatial dimensions. The technique requires minimal hardware modification and is potentially useful for image-guided radiation therapy systems.

Wiersma, R. D.; Mao Weihua; Xing, L. [Department of Radiation Oncology, Stanford University School of Medicine, Stanford, California 94305-5847 (United States)

2008-04-15T23:59:59.000Z

183

line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

along the existing along the existing Empire-EDS 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Empire-ED5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

184

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho  

Broader source: Energy.gov [DOE]

The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA’s proposed action is to partially fund part the transmission line. Additional information is available at www.boardmantohemingway.com.

185

Substation Expansion Planning  

Science Journals Connector (OSTI)

Consider an 11-load node case as depicted in Fig. 7.1..., fed in 33 kV and to be supplied through high-voltage (HV) substation(s) (say 230 kV:33 kV)... Fig. 7.1 ...

Hossein Seifi; Mohammad Sadegh Sepasian

2011-01-01T23:59:59.000Z

186

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

187

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

188

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

500 and 230 kV 765 kV and 800 kV HVDC 500 and 230 kV 500 kVmi) 138 and 345 kV 345 kV 345 kV 345 kV and HVDC 345kV and HVDC 345 kV 345 kV Note: Total transmission cost is

Mills, Andrew D.

2009-01-01T23:59:59.000Z

189

EIS-0422: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

190

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

Science Journals Connector (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the...

S. I. Gusev; V. N. Karpov; A. N. Kiselev; V. I. Kochkin

2009-09-01T23:59:59.000Z

191

Breaking the ice: de-icing power transmission lines with high-frequency, high-voltage excitation  

E-Print Network [OSTI]

Breaking the ice: de-icing power transmission lines with high-frequency, high-voltage excitation of this work in other works must be obtained from the IEEE. #12;CING OF POWER TRANSMISSION lines during winter that applies 33-kV, 100-kHz power. TheoverallsystemisillustratedinFigure1.Itcouldbede- ployed in two different

192

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

193

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

194

Protection and communication for a 230 kV transmission line using a pilot overreaching transfer tripping (POTT) scheme.  

E-Print Network [OSTI]

??New applications are continuously emerging in the ever-changing field of power systems in the United States and throughout the world, consequently causing new pressures on… (more)

Escalante De Leon, Lazaro Samuel

2013-01-01T23:59:59.000Z

195

Design of a differential protection scheme for a 345 kV transmission line using SEL 311L relays.  

E-Print Network [OSTI]

??Transmission networks are an important part of an electric power system. They help transfer power from the point of generation (power plants) to the substation.… (more)

Subrahmanyam, Tarangini Karoor

2014-01-01T23:59:59.000Z

196

EIS-0332: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

kilovolt transmission line between Bonneville Power Administration's existing McNary and John Day substations. Mitigation Action Plan for the McNary-John Day Transmission Line...

197

Design and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for Power Line Inspection and MaintenanceLine Inspection and Mainten  

E-Print Network [OSTI]

of the prototype thorough validation. Working on live lines, up to 735 kV and 1,000 A, means that the technology inspection and maintenance on its transmission lines [9]. From the very beginning, the key objectiveSystem RequirementsSystem RequirementsSystem Requirements A complete review of transmission line components

Paris-Sud XI, Université de

198

Help Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

199

30 kV coaxial vacuum-tight feedthrough for operation at cryogenic temperatures  

E-Print Network [OSTI]

In this paper we describe the technology of building a vacuum-tight high voltage feedthrough which is able to operate at voltages up to 30 kV. The feedthrough has a coaxial structure with a grounded sheath which makes it capable to lead high voltage potentials into cryogenic liquids, without risk of surface discharges in the gas phase above the liquid level. The feedthrough is designed to be used in ionization detectors, based on liquefied noble gases, such as Argon or Xenon.

I. Kreslo; I. Badhrees; S. Delaquis; A. Ereditato; S. Janos; M. Messina; U. Moser; B. Rossi; M. Zeller

2010-11-05T23:59:59.000Z

200

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild  

Broader source: Energy.gov (indexed) [DOE]

17: Lovell-Yellowtail and Basin-Lovell Transmission Line 17: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana Summary DOE's Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

202

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network [OSTI]

stakeholders in transmission-line route planning and sitingan “optimal” transmission line route-finding tool. This tool

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

203

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

204

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

205

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

206

Proposal for the award of a contract for the design, supply, installation and commissioning of a 66 kV electrical substation  

E-Print Network [OSTI]

Proposal for the award of a contract for the design, supply, installation and commissioning of a 66 kV electrical substation

2012-01-01T23:59:59.000Z

207

Microsoft Word - CX_Memo_L0276.docx  

Broader source: Energy.gov (indexed) [DOE]

line near the City of Lacey in Thurston County, Washington. PSE, a customer of BPA, plans to upgrade its St. Clair Substation from a 115-kV to a 230-kV facility, and...

208

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

209

STRATEGIC PLAN  

Energy Savers [EERE]

STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of...

210

Sample Lesson Plan Safety and Health Programs 1 Lesson Plan  

E-Print Network [OSTI]

culture that reduces accidents for workers and improves the bottom line for managers. When safetySample Lesson Plan ­ Safety and Health Programs 1 Lesson Plan General Industry Outreach Training Program (10-hour) Topic: Safety and Health Programs Overview Effective management of worker safety

Homes, Christopher C.

211

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada  

Broader source: Energy.gov [DOE]

This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

212

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Broader source: Energy.gov (indexed) [DOE]

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

213

Florida Electric Transmission Line Siting Act (Florida) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Act (Florida) Electric Transmission Line Siting Act (Florida) Florida Electric Transmission Line Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Transmission Line Siting Act (TLSA) is the state's centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15 miles or longer. An

214

CRYOGENIC SYSTEM FOR A 35 KV/90 MVA SATURATED IRON?CORE SUPERCONDUCTING FAULT CURRENT LIMITER  

Science Journals Connector (OSTI)

A cryogenic system was built as an open system for a 35 kV/90 MVA saturated iron?core superconducting fault current limiter. It consists of an annular cylindrical liquid nitrogen dewar cryogenic pipes sensors valves and a control unit. A HTS dc bias coil was immersed with liquid nitrogen in the dewar. The control circuit constantly monitors the liquid nitrogen level and controls the supply of liquid nitrogen in accordance with the liquid nitrogen level change. Nitrogen vapor was directly released into the environment. Heat loss under different working conditions such as no magnetization current 150 A magnetization current and on?grid condition was measured to evaluate the performance of the system. As compared with no magnetization current of the dc bias coil evaporation of liquid nitrogen increases about 20% under the on?grid condition.

H. Hong; W. Z. Gong; B. Tian; J. Y. Zhang; X. M. Hu; J. Z. Wang; X. Y. Niu; Y. Wang; L. F. Zhang; Y. W. Sun; T. Q. Wu; Y. Xin

2010-01-01T23:59:59.000Z

215

Simulation of ion beam transport through the 400 Kv ion implanter at Michigan Ion Beam Laboratory  

SciTech Connect (OSTI)

The Michigan Ion Beam Laboratory houses a 400 kV ion implanter. An application that simulates the ion beam trajectories through the implanter from the ion source to the target was developed using the SIMION Registered-Sign code. The goals were to have a tool to develop an intuitive understanding of abstract physics phenomena and diagnose ion trajectories. Using this application, new implanter users of different fields in science quickly understand how the machine works and quickly learn to operate it. In this article we describe the implanter simulation application and compare the parameters of the implanter components obtained from the simulations with the measured ones. The overall agreement between the simulated and measured values of magnetic fields and electric potentials is {approx}10%.

Naab, F. U.; Toader, O. F.; Was, G. S. [Department of Engineering and Radiological Sciences, University of Michigan, 2355 Bonisteel Boulevard, Ann Arbor, MI 48109-2104 (United States)

2013-04-19T23:59:59.000Z

216

Procedure for Planning and Conducting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lift Plan Procedure Lift Plan Procedure Stanford Synchrotron Radiation Laboratory Lead Author __________________________________ Date 07/13/2005___________ David A. Ernst Mechanical Service Group Approvals: __________________ Date _____________________ Matt Padilla SSRL Safety Officer __________________ Date _____________________ Robert Hettel Accelerator System Department Head __________________ Date _____________________ Piero Pianetta Beam Line System Department Head Hoist and Rigging Panel Member _______________________________________ Date ______________________

217

Using Dielectric Losses to De-Ice Power Transmission Lines with 100 kHz High-Voltage  

E-Print Network [OSTI]

capable of exciting a 1 m test line to 30 kV has been tested and show to be capable of removing a 7 mm iceUsing Dielectric Losses to De-Ice Power Transmission Lines with 100 kHz High-Voltage Excitation J DIELECTRIC LOSSES TO DE-ICE POWER TRANSMISSION LINES . . . 1 Using Dielectric Losses to De-Ice Power

218

Powerline Conductor Operational Testing Facility (PCOT) The Powerline Conductor Operational Testing Facility (PCOT), currently planned for  

E-Print Network [OSTI]

advanced overhead power line conductors and superconducting cables into an operational high-voltage (HV) transmission system for long-term testing and evaluation. The HV transmission test network within PCOT, Tennessee, 500-kV Substation. In addition to testing advanced conductors and cables, PCOT provides

219

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

220

A way to higher resolution: spherical-aberration correction in a 200 kV transmission electron microscope  

Science Journals Connector (OSTI)

......micrographs, ultramicroscopy 15: 151-172. rical pole-piece dimensions. The 200 kV spherical-aberra- 8 Thust A, Overwijk M H F, coene w M J. and Lentzen M (1996) tion-COrreCted microscope avoids the radiation damage Numerical correction of......

Knut Urban; Bernd Kabius; Max Haider; Harald Rose

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Study on Tubular Busbar Corona Design Optimization of ±660kV HVDC Converter Substation in Qingdao  

Science Journals Connector (OSTI)

The HVDC busbar corona characteristic is the main factor taken into account for choosing busbar of HVDC converter substation. By establishing the calculation models of electric field strength along the busbar surface, ground total electric field strength ... Keywords: ±660 kV HVDC, converter substation, corona characteristics, electromagnetic, tubular busbar optimization

Xu Mingming; Li Kejun; Tan Zhenyu; Niu Lin

2010-06-01T23:59:59.000Z

222

Development of 6.6kV/1.5kA-Class Superconducting Fault Current Limiter  

Science Journals Connector (OSTI)

The authors have developed and tested a 6.6kV/l.5kA-class superconducting fault current limiter, wound with an AC superconducting wire having ... up to 6.6kV were applied to the limiter. The limiter was able to s...

Kenji Tasaki; Kazuyuki Turunaga; Daisuke Ito…

1992-01-01T23:59:59.000Z

223

BNL test electron beam ion source operation on a 100 kV platform ,,abstract...a...,b...  

E-Print Network [OSTI]

BNL test electron beam ion source operation on a 100 kV platform ,,abstract...a...,b... E. N. Beebe to build an electron beam ion source EBIS that will satisfy the requirements of the relativistic heavy ion program. Development studies continue to be carried out on the BNL test EBIS, a half-length full electron

224

A fiducial detection algorithm for real-time image guided IMRT based on simultaneous MV and kV imaging  

SciTech Connect (OSTI)

The advantage of highly conformal dose techniques such as 3DCRT and IMRT is limited by intrafraction organ motion. A new approach to gain near real-time 3D positions of internally implanted fiducial markers is to analyze simultaneous onboard kV beam and treatment MV beam images (from fluoroscopic or electronic portal image devices). Before we can use this real-time image guidance for clinical 3DCRT and IMRT treatments, four outstanding issues need to be addressed. (1) How will fiducial motion blur the image and hinder tracking fiducials? kV and MV images are acquired while the tumor is moving at various speeds. We find that a fiducial can be successfully detected at a maximum linear speed of 1.6 cm/s. (2) How does MV beam scattering affect kV imaging? We investigate this by varying MV field size and kV source to imager distance, and find that common treatment MV beams do not hinder fiducial detection in simultaneous kV images. (3) How can one detect fiducials on images from 3DCRT and IMRT treatment beams when the MV fields are modified by a multileaf collimator (MLC)? The presented analysis is capable of segmenting a MV field from the blocking MLC and detecting visible fiducials. This enables the calculation of nearly real-time 3D positions of markers during a real treatment. (4) Is the analysis fast enough to track fiducials in nearly real time? Multiple methods are adopted to predict marker positions and reduce search regions. The average detection time per frame for three markers in a 1024x768 image was reduced to 0.1 s or less. Solving these four issues paves the way to tracking moving fiducial markers throughout a 3DCRT or IMRT treatment. Altogether, these four studies demonstrate that our algorithm can track fiducials in real time, on degraded kV images (MV scatter), in rapidly moving tumors (fiducial blurring), and even provide useful information in the case when some fiducials are blocked from view by the MLC. This technique can provide a gating signal or be used for intra-fractional tumor tracking on a Linac equipped with a kV imaging system. Any motion exceeding a preset threshold can warn the therapist to suspend a treatment session and reposition the patient.

Mao Weihua; Riaz, Nadeem; Lee, Louis; Wiersma, Rodney; Xing Lei [Department of Radiation Oncology, Stanford University School of Medicine, Stanford, California 94305-5847 (United States)

2008-08-15T23:59:59.000Z

225

A technical note about Phidel: a new software for evaluating magnetic induction field generated by power lines  

Science Journals Connector (OSTI)

......measurements collected near two 380 kV power lines(10) (Figure 7) using the LINDA system, made by an EMDEX II field meter (by Enertech Consultants) fixed on a mobile support, supplied with an odometer. This simultaneously records the field values, the time......

M. Comelli; M. Benes; A. Bampo; R. Villalta

2007-02-01T23:59:59.000Z

226

EA-1470: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment Interstate Intertie Centennial Plan: Harry Allen-Mead 500 kV Transmission Line Project Nevada Power Company (Nevada Power) is proposing to use...

227

KvAP1ORQ MthK3LDC Kv12R9R Supplementary Figure S1: Detailed view of TPenA docked into the 3 bestfit  

E-Print Network [OSTI]

of K2P channel block shown in Figure 1. Piechotta et al. Supplementary Information C2 TEA C4 TButA C5 TPenA C6 THexA C7 THepA C8 TOctA #12;Piechotta et al. Supplementary Information Supplementary Figure been published previously; a Milacet al(2011) b Treptow& Klein (2010). KvAP1ORQKv12R9RMthK3LDCKcsA3FB6

Tucker, Stephen J.

228

Detailed design of a 13 kA 13 kV dc solid-state turn-off switch  

SciTech Connect (OSTI)

An experimental facility for the study of electromagnetic effects in the First Wall-Blanket-shield (FWBS) systems of fusion reactors has been constructed at Argonne National Laboratory (ANL). In a test volume of 0.76 m/sup 3/, a vertical, pulsed 5 kG dipole field (B < 320 kGs/sup -1/) is perpendicular to a 10 kG solenoid field. Power supplies of 2.75 MW at 550 V dc and 5.5 MW at 550 V dc and a solid-state switch rated at 13 kA and 13 kV (169 MW) control the pulsed magnetic fields. The total stored energy in the coils is 2.6 MJ. This paper describes the design and construction features of the solid-state switching circuit which turns off a dc of 13 kA in approximately 82 ..mu..s and holds off voltages of < 13 kV.

Praeg, W.F.

1985-01-01T23:59:59.000Z

229

House Rejects Southern Idaho Power Line  

Science Journals Connector (OSTI)

The House of Representatives has refused to go along with the Bonneville Power Administration's plans to build a power transmission line into southern Idaho, where Monsanto hopes to use part of the power in a planned expansion of its elemental phosphorus ...

1964-06-22T23:59:59.000Z

230

Operating Plan of Mirant Potomac River, LLC in Compliance with Order No.  

Broader source: Energy.gov (indexed) [DOE]

Operating Plan of Mirant Potomac River, LLC in Compliance with Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Attached is the Operating Plan of Mirant Potomac River, LLC, which is being submitted in compliance with Order No. 202-05-03, issued by the Department of Energy on December 20, 2005, in the captioned proceeding. Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 More Documents & Publications Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

231

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

kV JCSP 765 kV and 800 kV HVDC Southern California Edison (2 345 kV ERCOT - TOS - 3 345 kV and HVDC ERCOT - TOS - 4345 kV and HVDC Southwest Power Pool (SPP) SPP - 2 345 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

232

Muehrcke's Lines  

Science Journals Connector (OSTI)

Figure 1. A 46-year-old woman with metastatic sarcoma who had been treated with five cycles of doxorubicin, ifosfamide, and mesna chemotherapy presented with two symmetrical, horizontal white lines on all of her fingernails but not on her toenails. A diagnosis of ...

Morrison-Bryant M.; Gradon J.D.

2007-08-30T23:59:59.000Z

233

Beau's Lines  

Science Journals Connector (OSTI)

Figure 1. A 62-year-old woman received six cycles of docetaxel chemotherapy during a six-month period for recurrent metastatic breast cancer. She had completed treatment four weeks before this photograph was taken. Six evenly spaced, transverse lines were noted on ...

Mortimer N.J.; Mills J.

2004-10-21T23:59:59.000Z

234

Task Plans  

Broader source: Energy.gov (indexed) [DOE]

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

235

The Results of Tests of ASK-100-4UKhL4 Type Asynchronized Compensators at the Beskudnikovo 500 kV Substation  

Science Journals Connector (OSTI)

Two ASK-100-4UKhL4 100 Mvar asynchronized compensators were introduced into operation in the 500 kV Beskudnikovo substation in 2012. The results of systems tests...

L. G. Volodarskii; I. Ya. Dovganyuk; R. D. Mnev…

2014-01-01T23:59:59.000Z

236

Development and interrupting tests on 250KV 8KA HVDC circuit breaker  

SciTech Connect (OSTI)

This paper describes the circuit and component selections, development and equivalent circuit test results on an HVDC circuit breaker for an HVDC transmission line. A puffer type SF/sub 6/ gas interrupter for AC circuit breakers is utilized for interrupting DC current with injection of high-frequency inverse current from a commutating capacitor precharged to HVDC line voltage. Also, the effectiveness of application of the HVDC breaker to an HVDC system with two parallel transmission lines is demonstrated through the EMTP simulation.

Tokuyama, S.; Arimatsu, K.; Hirata, K.; Kato, Y.; Yoshioka, Y.

1985-09-01T23:59:59.000Z

237

BEAM LINE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

238

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

239

Site Visit Report - Independent Oversight Review of Work Planning...  

Broader source: Energy.gov (indexed) [DOE]

representatives participate in daily work planning meetings; and instituting Conduct of Operations training for front line managers and Facility Managers. PRS also began...

240

FY 2015 Argonne Site Sustainability Plan | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FY 2015 Argonne Site Sustainability Plan Argonne National Laboratory is committed to reducing its environmental footprint. Our site sustainability goals are in line with U.S....

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

BPA to share costs with PUDs in regional planning project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

transmission planning. They will share the costs of building a 14 million high-voltage transmission line in Central Washington developed through collaborative assessment and...

242

Libby-Troy Line Rebuild Project - July 25, 2008  

Broader source: Energy.gov (indexed) [DOE]

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

243

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

SciTech Connect (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

Gusev, S. I. [JSC 'FSK EES' (Russian Federation); Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I. [Scientific-Research Institute of Electric Power Engineering (VNIIE) - Branch of the JSC 'NTTs Elektroenergetiki', (Russian Federation)

2009-09-15T23:59:59.000Z

244

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

245

Proactive Planning  

E-Print Network [OSTI]

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

246

EA-1508: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

508: Mitigation Action Plan 508: Mitigation Action Plan EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado This is the mitigation action plan (MAP) for use during construction of the Beaver Creek-Hoyt-Erie transmission line upgrades, including right-of ways (ROWS), hydrology, vegetation, construction debris and dewatering, landscape engineering, borrow pits and recommended procedures for Raptors and powerline construction. Mitigation Action Plan to Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 More Documents & Publications EA-1617: Mitigation Action Plan EA-1456: Mitigation Action Plan EA-1611: Mitigation Action Plan

247

EIS-0421: Big Eddy-Knight Transmission Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21: Big Eddy-Knight Transmission Line 21: Big Eddy-Knight Transmission Line EIS-0421: Big Eddy-Knight Transmission Line Overview BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line would extend generally northeast from BPA's existing Big Eddy Substation in The Dalles, Oregon, to a new substation (Knight Substation) proposed to be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The proposed Big Eddy Knight Transmission Project is needed to increase transmission capacity to respond to requests for transmission service in this area. Public Comment Opportunities No public comment opportunities available at this time.

248

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect (OSTI)

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

249

Quench current degradation in superconducting coil for 6.6 kV/2 fault current limiter  

SciTech Connect (OSTI)

A 6.6 kV/2 kA class fault current limiter that consists of non-inductive superconducting windings was developed and tested. The limiter can deliver continuous power at 2 kArms and limit fault current of more than 20 kA to 4 kA in 6 kV. The limiter recovers to the superconducting state within a few seconds and can perform a fault current limiting operation in 60 seconds after the last limiting operation. After high-voltage operation, however, the quench current of the limiter dropped significantly. This quench current degradation is related to the coil bobbin strain due to helium pressure raised by large ohmic heating in quenching. The degradation is a fatal problem for a fault current limiter if the quench current falls below the operating current because the limiter cannot revert to the normal operation. High Young`s modulus bobbin is effective to remove the coil degradation. They have obtained a fault current limiter without any degradation after repeated limiting operations.

Tasaki, K.; Yazawa, T.; Yoneda, E.S.; Nomura, S.; Maeda, H. [Toshiba Corp., Kawasaki (Japan). Research and Development Center] [Toshiba Corp., Kawasaki (Japan). Research and Development Center; Ohkuma, T.; Nakade, M.; Hara, T. [Tokyo Electric Power Co., Yokohama (Japan). Power Engineering R and D Center] [Tokyo Electric Power Co., Yokohama (Japan). Power Engineering R and D Center

1996-07-01T23:59:59.000Z

250

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Broader source: Energy.gov (indexed) [DOE]

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

251

CFN Ops Plan | Work Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

252

EIS-0091: Garrison-Spokane 500-kV Transmission Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

253

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

254

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

255

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

256

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

257

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

258

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Broader source: Energy.gov (indexed) [DOE]

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

259

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

260

(This page intentionally left blank.) Corrective Action Plan  

E-Print Network [OSTI]

: Radiation Protection....................................................................34 Finding C4#12;(This page intentionally left blank.) #12;#12;#12;Corrective Action Plan to the Independent line from "Develop plan to communicate action D1-3" to "Develop plan to communicate action D1-2" 4

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Motion planning with sequential convex optimization and convex collision checking  

Science Journals Connector (OSTI)

We present a new optimization-based approach for robotic motion planning among obstacles. Like CHOMP (Covariant Hamiltonian Optimization for Motion Planning), our algorithm can be used to find collision-free trajectories from naïve, straight-line initializations ... Keywords: Motion planning, convex collision checking, sequential convex optimization, trajectory optimization

John Schulman, Yan Duan, Jonathan Ho, Alex Lee, Ibrahim Awwal, Henry Bradlow, Jia Pan, Sachin Patil, Ken Goldberg, Pieter Abbeel

2014-08-01T23:59:59.000Z

262

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group  

E-Print Network [OSTI]

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 0880BSE Sub-Plan: RG 6856 BIOMEDICAL ENGINEERING MAJOR REQUIREMENTS Effective FA05/1560 (09/06/2005) RQ 4996 Program Subjects Effective FA05/1560 (09/06/2005) LN 0010 BIOMEDE

Shyy, Wei

263

Design and Simulation of Novel Enhancement Mode 5–20 kV GaN Vertical Superjunction High Electron Mobility Transistors for Smart Grid Applications  

Science Journals Connector (OSTI)

We report on the design, simulations and optimization of a novel enhancement mode 5–20 kV GaN vertical superjunction (SJ) high electron mobility transistor (HEMT). We optimize the space charge in GaN pillars using GaN SJ p–n diode for the best trade-off between breakdown voltage (BV) and specific on-resistance (Ronsp), by varying the pillar dosage, length and width. The resulting GaN SJ field effect transistor (FET) structure is projected to have, for example, Ronsp of 4.2 m? cm2 with BV of 12.4 kV.

Zhongda Li; T. Paul Chow

2013-01-01T23:59:59.000Z

264

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

265

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

266

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

267

HTS dc bias coil for 35 kV/90 MVA saturated iron-core fault current limiter  

Science Journals Connector (OSTI)

A superconductive coil with 141,000 ampere-turns designed magnetizing power, made of 17,600 meters of BSCCO 2223 HTS tapes, was fabricated and tested. This coil was built for a 35 kV/90 MVA saturated iron-core fault current limiter. Computer simulations on the performance of the coil were carried out using ANSYS. The critical current of the superconducting coil and the dc resistance of the coil, including the non-superconducting joints, were investigated. Spatial distribution of the magnetic field was measured and compared with the simulation results. In this paper, we will report the configuration and the key parameters of the coil as well as the experimental and simulation results.

W.Z. Gong; J.Y. Zhang; Z.J. Cao; H. Hong; B. Tian; Y. Wang; J.Z. Wang; X.Y. Niu; J. Qiu; S.H. Wang; Y. Xin

2008-01-01T23:59:59.000Z

268

NSLS-II Transport Line Progress  

SciTech Connect (OSTI)

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

2012-05-20T23:59:59.000Z

269

Tax-Advantaged Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

270

Operation experiences with a 30 kV/100 MVA high temperature superconducting cable system  

Science Journals Connector (OSTI)

A superconducting cable based on Bi-2223 tape technology has been developed, installed and operated in the public network of Copenhagen Energy in a two-year period between May 2001 and May 2003. This paper gives a brief overview of the system and analyses some of the operation experiences. The aim of this demonstration project is to gain experience with HTS cables under realistic conditions in a live distribution network. Approximately 50?000 utility customers have their electric power supplied through the HTS cable. The cable system has delivered 226 GW h of energy and reached a maximum operating current of 1157 A. The operation experiences include over-currents of 6 kA due to faults on peripheral lines, commissioning, servicing and failure responses on the cooling system, continuous 24 h, 7 day per week monitoring and performance of the alarm system. The implications of these experiences for the future applications of HTS cable systems are analysed.

Ole Tønnesen; Manfred Däumling; Kim H Jensen; Svend Kvorning; Søren K Olsen; Chresten Træholt; Erling Veje; Dag Willén; Jacob Østergaard

2004-01-01T23:59:59.000Z

271

Record of Decision and Floodplain Statement of Findings; Imperial-Mexicali 230-kV Transmission Lines (DOE/EIS-0365) (4/25/05)  

Broader source: Energy.gov (indexed) [DOE]

189 189 Federal Register / Vol. 70, No. 78 / Monday, April 25, 2005 / Notices 1 On April 13, 2005, the Secretary of Energy transferred the authority to grant Presidential permits from the Office of Fossil Energy to the Office of Electricity and Energy Assurance. 2 Throughout court proceedings and the EIS process, BCP has been referred to as Intergen. This naming convention was used to avoid confusion and because that was the name by which the court knew the permit applicant. This naming convention also will be used throughout this ROD. 3 On August 29, 2002, Sempra and Termoele ´ ctrica U.S., LLC (T-US) jointly filed an application with DOE for the voluntary transfer from Sempra to T- US of the facilities authorized by Presidential Permit PP-235, which was issued to Sempra by

272

Accident Investigation of the July 30, 2013, Electrical Fatality on the Bandon-Rogue No. 1 115kV Line at the Bonneville Power Administration  

Broader source: Energy.gov [DOE]

This report is an independent product of the Level I Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Level I Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting.

273

Microsoft Word - CX_FINAL_Sale_of_Eight_Spans_Tanner_Tap_115-kV_Transmission_Line_to_PSE_6-5-2012_.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan B. Kendall Project Manager -TERR-3 Proposed Action: Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24. Property Transfer Location: King County, Washington; Township 24 North, Range 7 East, Section 36, Willamette Meridian Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell to Puget Sound Energy (PSE) the first eight spans of its 115-kV Tanner Tap to Snoqualmie-Lake Tradition #1 transmission line (Tanner Tap-8). Tanner Tap-8, built in 2002, is owned and operated by BPA and located within a 150 feet

274

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

275

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

276

E-Print Network 3.0 - automated on-line separation-preconcentration...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management System... Bhanuprakash: "On-line Greeting Card Mailer" Nancy Grieb: "Software Test Evaluator & Planning Tool Using... Research of Gene Transcriptional Profiling"...

277

Maps and Plans  

E-Print Network [OSTI]

shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

Rose, Thomas

2008-01-01T23:59:59.000Z

278

Parallel Lines II: Construction of Parallel Lines  

Science Journals Connector (OSTI)

Situations are frequently encountered in which two lines, determined by linear regression, are theoretically...m 1 and m 2.

Ronald J. Tallarida Ph. D.; Rodney B. Murray Ph. D.

1987-01-01T23:59:59.000Z

279

Annual Training Plan Template  

Broader source: Energy.gov [DOE]

The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

280

Waste minimization and pollution prevention awareness plan  

SciTech Connect (OSTI)

The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. The intent of this plan is to respond to and comply with (DOE's) policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Programs and Departments. 14 refs.

Not Available

1991-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

282

Specific test and evaluation plan  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

283

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

284

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

285

Using product line architectures to leverage systematic reuse of business knowledge: an industrial experience  

Science Journals Connector (OSTI)

Software Product Line Engineering (PLE) exploits systematic reuse by identifying and methodically reusing software artifacts to develop different but related software systems. Developing product lines requires analysis skills to identify, model, and ... Keywords: enterprise resource planning (ERP) systems, product-line engineering, software product lines, systematic reuse

Haitham S. Hamza; Gamal M. Aly

2010-10-01T23:59:59.000Z

286

Adapting the Transmission Reach in Mixed Line Rates WDM Transport Networks  

E-Print Network [OSTI]

Adapting the Transmission Reach in Mixed Line Rates WDM Transport Networks K. Christodoulopoulos, K to support the transmission at different line rates. Previously proposed planning algorithms, have used a transmission reach limit for each modulation format/line rate, mainly driven by single line rate systems

Varvarigo, Emmanouel "Manos"

287

Public Opinions of Building Additional High-Voltage Electric Power Lines  

E-Print Network [OSTI]

to build new power lines. Residents living in counties with planned routes for new transmission linesPublic Opinions of Building Additional High-Voltage Electric Power Lines A Report to the National-Voltage Electric Power Lines: A Report to the National Science Foundation and the Electric Power Research Center

Tesfatsion, Leigh

288

Leveraging infrastructure : sustainable bus rapid transit route planning in Beirut, Lebanon  

E-Print Network [OSTI]

This thesis applies the concepts of urban design, public transportation planning, economic development, and sustainability, to the routing and site plan of a two-kilometer bus rapid transit (BRT) line segment into downtown ...

Nabti, Jumana M., 1976-

2004-01-01T23:59:59.000Z

289

CRAD, Federal Assurance Capability Plan - February 11, 2009 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Federal Assurance Capability Plan - February 11, 2009 Federal Assurance Capability Plan - February 11, 2009 CRAD, Federal Assurance Capability Plan - February 11, 2009 February 11, 2009 Federal Assurance Capability Plan Inspection Criteria and Approach, DNFSB 2004-1, Commitment 16 (HSS CRAD 64-40, Rev. 0) Federal Assurance Capability Review Plan provides a plan, including criteria, approaches, and the lines of inquiry, to be used for assessing the effectiveness of areas relating to the establishment of a robust Federal assurance capability. The review plan covers all areas in Section 5.1 of the DOE Implementation Plan (IP) except for Section 5.1.3, Instituting a Nuclear Safety Research Function. CRAD, Federal Assurance Capability Plan - February 11, 2009 More Documents & Publications CRAD, Operating Experience - February 11, 2009

290

PROJECT MANAGEMENT PLANS Project Management Plans  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

291

Testing of a 50 kA, 50 kV current interrupter with I sup 2 t preheating and long recovery voltage  

SciTech Connect (OSTI)

The Confinement Physics Research Facility (CPRF) presently being constructed at Los Alamos in a next generation Reversed Field Pinch (RFP) plasma experiment. An inductive energy transfer system, employing a 50 kA, 50 kV dc current interrupter, is being utilized for initiating the plasma current. These performance requirements (50 kA, 50 kV) had yet to be realized in a reliable switching system, development of this current interrupter system was initiated. A switch test bay with a 50 kA battery bank has been built at Los Alamos to test the interrupter in conditions which will exist in the CPRF experiment. Many switch parameters were measured to provide information on the current interrupting characteristics and reliability. Some of these diagnostics include voltage, current, pre and post I{sup 2}t contact resistance, opening speed and position, arc voltage, and stem temperature. To determine any long term changes, all shots and data channels are computer indexed, and may be easily recalled for review. Extensive testing was performed on Siemens D-10 vacuum interrupter. Test parameter space included 55 kA, 40 kV (per bottle); di/dt of 2250 A/{mu}s, I{sup 2}t of 5 {times} 10{sup 9} amp{sup 2} sec; and 20 kV-200 msec RC recovery decay. Circuit parameters effect opening reliability. Circuit data and the associated testing results will be presented along with long term trends of switch performance under normal'' conditions. 12 figs.

Reass, W.A.; Boenig, H.J.; Melton, J.G. (Los Alamos National Lab., NM (USA))

1989-01-01T23:59:59.000Z

292

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

293

LANS DB PENSION PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

December 2010 December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this SPD shall be construed as giving any member the right to be retained in service with LANS or any affiliated company, or as a guarantee of any rights or benefits under the Plan. LANS, in its sole discretion, reserves the right to amend the SPD or Plan, or to terminate the Plan, at any time.

294

Knowledge Preconditions for Plans  

Science Journals Connector (OSTI)

......research-article Original Articles Knowledge Preconditions for Plans ERNEST DAVIS...of time and a possible worlds model of knowledge. The definitions strictly subsume previous...semantics of plans|formal theory of knowledge.| Knowledge Preconditions for Plans......

ERNEST DAVIS

1994-10-01T23:59:59.000Z

295

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

296

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

297

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

298

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

299

State Waste Discharge Permit ST-4502 Implementation Plan  

SciTech Connect (OSTI)

Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

BROWN, M.J.; LECLAIR, M.D.

2000-09-27T23:59:59.000Z

300

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Venus Technology Plan Venus Technology Plan  

E-Print Network [OSTI]

Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration a Roadmap for Venus Exploration (RVE) that is consistent with VEXAG priorities as well as Planetary Decadal Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology

Rathbun, Julie A.

302

Estimation of the minimum shielding failure flashover current for first and subsequent lightning strokes to overhead transmission lines  

Science Journals Connector (OSTI)

Abstract ATP-EMTP simulations are performed to estimate the minimum shielding failure current causing flashover in overhead transmission lines with operating voltage in the range of 66 kV up to 735 kV. This critical current, affecting shielding failure flashover rate, is of great importance for assessing the insulation coordination of overhead transmission lines and the connected substations. The minimum shielding failure current causing flashover of line insulation is highly dependent upon insulator string flashover modelling and, also, markedly higher than that calculated according to the relevant IEEE Std 1243-1997 simplified expression. A modification of the latter is suggested by using multiplication factors of 1.5 and 1.65 for first and subsequent lightning strokes, respectively, so as to account for the increased dielectric strength of line insulator strings under non-standard lightning overvoltage surges. Alternatively, the critical currents can be respectively estimated by using average negative breakdown gradients per unit length of insulator string of 680 kV/m and 750 kV/m. The shielding failure flashover rate of the overhead transmission lines, being greatly influenced by insulator string flashover modelling, is lower than that obtained based on the critical current according to IEEE Std 1243-1997.

Zacharias G. Datsios; Pantelis N. Mikropoulos; Thomas E. Tsovilis

2014-01-01T23:59:59.000Z

303

4865 recreation planning [n  

Science Journals Connector (OSTI)

landsc. plan. pol. recr....(Development of policies, strategies and measures for the provision of recreation areas and facilities; ? urban area recreation planning ...

2010-01-01T23:59:59.000Z

304

Marketing Planning: Feeniks Koulu.  

E-Print Network [OSTI]

??Degree Thesis “Marketing Planning: Feeniks Koulu” demonstrates structured marketing planning process with the help of case company “Feeniks Koulu”. The central idea of Thesis is… (more)

Raut, Biranjan

2013-01-01T23:59:59.000Z

305

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

306

North Australian Cloud Lines  

Science Journals Connector (OSTI)

A satellite classification and climatology of propagating mesoscale cloud fines in northern Australia is presented. These cloud fines range from long, narrow lines of shallow convection to extensive deep convective squall lines with mesoscale ...

W. Drosdowsky; G. J. Holland

1987-11-01T23:59:59.000Z

307

Hazardous Waste Compliance Program Plan  

SciTech Connect (OSTI)

The Hazardous Waste Compliance Program Plan (HWCPP) describes how the Rocky Flats Plant institutes a more effective waste management program designed to achieve and maintain strict adherence to the Resource Conservation and Recovery Act (RCRA) requirements. Emphasis is given to improve integration of line operations with programmatic and functional support activities necessary to achieve physical compliance to RCRA regulated equipment, facilities and operations at the floor level. This program focuses on specific activities occurring or which need to occur within buildings containing RCRA regulated units and activities. The plan describes a new approach to achieving and maintaining compliance. This approach concentrates authority and accountability for compliance with the line operating personnel, with support provided from the programmatic functions. This approach requires a higher degree of integration and coordination between operating and program support organizations. The principal changes in emphases are; (1) increased line operations involvement, knowledge and accountability in compliance activities, (2) improved management systems to identify, correct and/or avoid deficiencies and (3) enhanced management attention and employee awareness of compliance related matters.

Potter, G.L.; Holstein, K.A.

1994-05-01T23:59:59.000Z

308

Motion Planning ! Jana Kosecka!  

E-Print Network [OSTI]

1! Motion Planning ! Jana Kosecka! Department of Computer Science! ·Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien! Discrete Planning! · Review of some discrete planning methods! · Given state space is discrete) ! · Use well developed search and graph traversal algorithms to find the path! · Path: set

Kosecka, Jana

309

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

310

Intermountain Province Subbasin Plan  

E-Print Network [OSTI]

, and stakeholders. The IMP subbasin plan includes: · an assessment providing the technical foundation for the plan Power and Conservation Council Portland, Oregon O N B E H A L F O F : Intermountain Province Oversight Planning in the Intermountain Province The Northwest Power Planning Council1 's (Council) 2000 Fish

311

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

312

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Broader source: Energy.gov (indexed) [DOE]

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

313

Definition: Blackstart Capability Plan | Open Energy Information  

Open Energy Info (EERE)

Blackstart Capability Plan Blackstart Capability Plan Jump to: navigation, search Dictionary.png Blackstart Capability Plan A documented procedure for a generating unit or station to go from a shutdown condition to an operating condition delivering electric power without assistance from the electric system. This procedure is only a portion of an overall system restoration plan.[1] View on Wikipedia Wikipedia Definition A black start is the process of restoring a power station to operation without relying on the external electric power transmission network. Normally, the electric power used within the plant is provided from the station's own generators. If all of the plant's main generators are shut down, station service power is provided by drawing power from the grid through the plant's transmission line. However, during a wide-area

314

FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 | Department  

Broader source: Energy.gov (indexed) [DOE]

OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2009 Operational Plan FY2009 Operational Plan - Goal 1 Summary FY2009 Operational Plan - Goal 2 Summary

315

Plan - Data Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

316

Guidance for Planning Exercises  

Broader source: Energy.gov (indexed) [DOE]

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

317

Germ-line Allele  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Germ-line Allele Germ-line Allele Name: Rachel Location: N/A Country: N/A Date: N/A Question: Can you please explain a "germ-line allele" to me! It is very important for a research paper I am writing about breast cancer. Replies: Mutations in genes are only able to be passed to the offspring if they are found in gametes (egg, sperm) mutations that occur in body cells other than gametes are usually not important because the cells can be replaced and they die eventually. The only way a characteristic can be passed to the offspring is through the eggs and sperm, so if there is a mutation in one these cells, the offspring can inherit the mutation. So a germ-line cell is a gamete. And a germ line allele is a version of the trait that is passed to the offspring through the germ line cell (or gamete).

318

Nematostatics of triple lines  

Science Journals Connector (OSTI)

The Landau–de Gennes model for nematic liquid crystal bulk and interfaces has been extended to nematic triple lines involving the intersection of two isotropic fluids and one nematic liquid crystalline phase. A complete set of bulk, interface, and triple line force and torque balance equations has been formulated. The triple line force and torque balance equations have linear, interfacial, and bulk contributions. The bulk contributions appear as junction integrals, the surface contributions as junctions sums, and the line contributions as gradients of stresses. Reduction of dimensionality from three to one dimensional creates the following effects: (a) bulk terms enter interfacial balances as surface jumps and line balances as junction integrals, and (b) surface terms enter linear balances as junction sums. Line stress and torque equations are derived using classical liquid crystal models. The correspondence between line stress and line torque and their surface and bulk analogs is established. The triple line force and torque balance equations are use to analyze the contact angle in a nematic lens lying at the interface between two isotropic fluids, when the prefered surface orientation is tangential. The effect of anisotropy and long range elasticity on triple line phases is established. Under weak anchoring the contact angle is shown to be a function of the anchoring energy at the nematic-isotropic interface, while under strong anchoring conditions the contact angle is a function of the Peach-Koehler force that originates from bulk long range elasticity and acts on the triple line. The use of the complete set of balance equations removes the classical inconsistency in force balances at a contact line by properly taking into account long range (bulk gradient elasticity) and anisotropic (interfacial anchoring elasticity) effects.

Alejandro D. Rey

2003-01-30T23:59:59.000Z

319

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

320

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

SciTech Connect (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitaton is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

SciTech Connect (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitation is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1989-01-01T23:59:59.000Z

322

Microsoft Word - prjct planning  

Broader source: Energy.gov (indexed) [DOE]

Planning Checklist Planning Checklist The following checklist is intended to provide system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and preparing project planning activities. The checklist reflects recognized project planning activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies, policies, programs, and procedures for achieving the objectives and goals of the project. The objectives of project planning for information systems projects are summarized as the following: C User's environment is analyzed. C Project objectives and scope are defined. C High-level functional requirements are estimated.

323

Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities  

Broader source: Energy.gov (indexed) [DOE]

14 14 Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Commercial Grade Dedication (CGD) August 2013 2 of 14 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Commercial Grade Dedication (CGD) Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation August 2013 3 of 14 Table of Contents Objective ....................................................................................................................................................... 4 Overview of Commercial Grade Dedication for Nuclear Facilities .............................................................. 4 Requirements ................................................................................................................................................ 5

324

Assessment of occupational exposure to magnetic fields in high-voltage substations (154/34.5 kV)  

Science Journals Connector (OSTI)

......workers on lines and cables and 0.2-18.48 microT for electricians(1,2). At the moment, it can be mentioned that ICNIRP...H., Iskender M. F. Radio Frequency Radiation Dosimetry Handbook. (1986) fourth edn. TX: Brooks Air Force Base, School......

S. Helhel; S. Ozen

2008-03-01T23:59:59.000Z

325

Tribal Strategic Energy Plan and Planning Handbook  

Broader source: Energy.gov [DOE]

The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

326

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

327

Solid-state Marx based two-switch voltage modulator for the On-Line Isotope Mass Separator accelerator at the European Organization for Nuclear Research  

SciTech Connect (OSTI)

A new circuit topology is proposed to replace the actual pulse transformer and thyratron based resonant modulator that supplies the 60 kV target potential for the ion acceleration of the On-Line Isotope Mass Separator accelerator, the stability of which is critical for the mass resolution downstream separator, at the European Organization for Nuclear Research. The improved modulator uses two solid-state switches working together, each one based on the Marx generator concept, operating as series and parallel switches, reducing the stress on the series stacked semiconductors, and also as auxiliary pulse generator in order to fulfill the target requirements. Preliminary results of a 10 kV prototype, using 1200 V insulated gate bipolar transistors and capacitors in the solid-state Marx circuits, ten stages each, with an electrical equivalent circuit of the target, are presented, demonstrating both the improved voltage stability and pulse flexibility potential wanted for this new modulator.

Redondo, L. M.; Canacsinh, H.; Ferrao, N.; Mendes, C. [Instituto Superior de Engenharia de Lisboa (ISEL), R. Conselheiro Emidio Navarro 1, Lisbon 1959-007 (Portugal); Nuclear Physics Center-Lisbon University (CFNUL), Av. Prof. Gama Pinto 2, Lisbon 1649-003 (Portugal); Silva, J. Fernando [Instituto Superior Tecnico (IST), Universidade Tecnica de Lisboa, Av. Rovisco Pais 1, Lisbon 1049-001 (Portugal); Center for Innovation in Electrical and Energy Engineering-TU Lisbon, Av. Rovisco Pais 1, Lisbon 1049-001 (Portugal); Soares, R. [Nuclear Physics Center--Lisbon University (CFNUL), Av. Prof. Gama Pinto 2, Lisbon 1649-003 (Portugal); ABT Group, TE Department, Site de Prevessin, FR-01631 CERN (Switzerland); Schipper, J.; Fowler, A. [ABT Group, TE Department, Site de Prevessin, FR-01631 CERN (Switzerland)

2010-07-15T23:59:59.000Z

328

Training Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

329

Geodesic Lines, . . . Covariant . . .  

E-Print Network [OSTI]

Geodesic Lines, . . . Covariant . . . Home Page Title Page Page 781 of 818 Go Back Full Screen Close Quit 14.11. Geodesic Lines, Local Gauss-Bonnet Theorem Geodesics play a very important role in surface theory and in dynamics. One of the main reasons why geodesics are so important

Gallier, Jean

330

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

331

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

332

Green Development Plan  

Science Journals Connector (OSTI)

The Ninth Five-Year Plan introduced two changes: “the economic system will change from a traditional planned economy to a socialist market economy”; and “the economic growth mode will change from extensive to int...

Angang Hu

2014-01-01T23:59:59.000Z

333

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

Slides thanks to http://cs.cmu.edu/~motionplanning, Jyh-Ming Lien Hard Motion Planning · Configuration Geometric Models S Sampling Based Motion Planner Discrete Search C-space planning Idea : Generate random

Kosecka, Jana

334

RM Capital Investment Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capital Investment Plans FY 2004 (568kb pdf) FY 2005 (625kb pdf) FY 2006 (625kb pdf) FY 2007 (1.45mb pdf) Meter policy Capital Investment Plans...

335

Decommissioning Plan RM  

Broader source: Energy.gov [DOE]

The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

336

Sustainabiliity Sustainability Plan  

E-Print Network [OSTI]

Sustainabiliity IIT Campus Sustainability Plan 2010­2020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

Heller, Barbara

337

Virginia Energy Plan (Virginia)  

Broader source: Energy.gov [DOE]

The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the state’s energy picture through an examination of the state’s primary energy...

338

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

339

State Grid Corp | Open Energy Information  

Open Energy Info (EERE)

Corp Jump to: navigation, search 2011-2015 Plans for 1000kV transmission lines (UHV) 1 http:www.chinadaily.com.cnbusiness2010-0813content11148692.htm Retrieved from...

340

Comments from the Virginia Department of Environmental Quality...  

Broader source: Energy.gov (indexed) [DOE]

on PEPCO's intention to commence planned transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the Virginia...

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

College W&M Colorado Sch Mines  

E-Print Network [OSTI]

to Strap Center · Designed to bring system voltage limit with plasma (~15 kV) to limit in vacuum (~25 kV;PAC-27 - HHFW Progress & Plans (Taylor) February 4, 2010 · Modifications to external transmission line

Princeton Plasma Physics Laboratory

342

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

343

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

344

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

345

2030 OCARTS Plan Report  

E-Print Network [OSTI]

2030 OCARTS PLAN REPORT Oklahoma City Area Regional Transportation Study Adopted by the Intermodal Transportation Policy Committee and Endorsed by the Board of Directors of the Association... entitled Planning for 2030: Oklahoma City Area Regional Transportation Study and the Technical Supplement to the Plan Report are companion pieces to this document. The Plan brochure was developed to provide an overview of both the development process...

Association of Central Oklahoma Governments

346

NHMFL Emergency Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

347

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

1 Motion Planning Jana Kosecka Department of Computer Science · Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien State space · Set of all possible states is represented as graph · Nodes states, links planning ­ generate a set of actions, if the solution exists it must be found in the finite time · Search

Kosecka, Jana

348

Bicycle Master Plan Acknowledgments  

E-Print Network [OSTI]

Bicycle Master Plan #12;Acknowledgments Many people contributed to the development of the APU Bicycle Master Plan by providing valuable input, comments and review of the document. Different departments of APU will have to work together to implement the plan and to further encourage bicycling

Scheel, David

349

Draft 2014 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013...

350

Long Range Campus Development Plan Implementation and Plan Phasing  

E-Print Network [OSTI]

Long Range Campus Development Plan Implementation and Plan Phasing 55 Introduction Plan Review approach and the formal, regular review of the process of the Plan. MSU will revisit the Plan on a cyclical will continue to build upon and refine these fundamental elements and strategies. Recurring review of the Plan

Maxwell, Bruce D.

351

Waste Management Quality Assurance Plan  

SciTech Connect (OSTI)

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

352

Report: EM Strategic Planning  

Broader source: Energy.gov (indexed) [DOE]

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

353

Operating plan FY 1998  

SciTech Connect (OSTI)

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

354

Alaska Strategic Energy Plan and Planning Handbook  

Broader source: Energy.gov (indexed) [DOE]

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

355

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Oliver, Douglas L.

356

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Kim, Duck O.

357

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

358

FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 | Department  

Broader source: Energy.gov (indexed) [DOE]

Operational Plan and Closeout Summary, Fiscal Year 2012 Operational Plan and Closeout Summary, Fiscal Year 2012 FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2012 Operational Plan FY2012 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

359

FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 | Department  

Broader source: Energy.gov (indexed) [DOE]

Operational Plan and Closeout Summary, Fiscal Year 2011 Operational Plan and Closeout Summary, Fiscal Year 2011 FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2011 Operational Plan FY2011 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

360

Holes in Spectral Lines  

E-Print Network [OSTI]

The decay of an atom in the presence of a static perturbation is investigated. The perturbation couples a decaying state with a nondecaying state. A "hole" appears in the emission line at a frequency equal to the frequency ...

Fontana, Peter R.; Srivastava, Rajendra P.

1973-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Lifting by Convergence Lines  

Science Journals Connector (OSTI)

The lifting depth of a convergence line in an unstratified boundary layer beneath a stably stratified atmosphere is examined with both analytical and numerical models. Cases are considered with and without flow in the layer above the convergence ...

N. Andrew Crook; Joseph B. Klemp

2000-03-01T23:59:59.000Z

362

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

363

Line tension vector thermodynamics of anisotropic contact lines  

Science Journals Connector (OSTI)

Multiphase materials with intersecting diving surfaces give rise to contact lines. A line tension vector thermodynamics formalism is developed and used to analyze contact line problems in the presence of anisotropy, taking into account two elastic modes: change in contact line length and change in contact line orientation. Using this formalism, the contact line-shape equation is derived, and the renormalization of the line tension due to anisotropy is characterized. The correspondence and analogies between the shape equation for anisotropic surfaces (Herring equation) and the shape equation for contact lines is established. Line energies for nematic liquid crystals, representative of generic anisotropic contact lines, are used to derive a shape equation that takes into account ambient orientation effects. It is found that anisotropic line tension may promote bending and chiral modes to avoid unfavorable orientations of the contact line with respect to the ambient nematic ordering.

Alejandro D. Rey

2004-04-30T23:59:59.000Z

364

CRAD, Communications Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CRAD, Communications Assessment Plan CRAD, Communications Assessment Plan CRAD, Communications Assessment Plan Performance Objective: Lines of authority are clearly defined with clear and open communications existing between all departments and all levels. Criteria: Dialogue exists between personnel involved in engineering/design, operations, maintenance, safety issues, and remedial actions. Personnel within the departments are promptly informed on issues as they occur on a need-to-know basis. Lessons Learned and feedback is encouraged inter-departmentally regarding safety, adequate resources, and processes to enable prompt and effective corrective actions and resolutions for mission accomplishment. Management has an effective and specified chain of communication in both directions between corporate and facility management. (DOE/EH-0135)

365

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I  

E-Print Network [OSTI]

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I DAVID DUFFY,* S with planning experts and reviewed current literature to derive 15 criteria that in our opinion were important that reviewed plans only partially fulfilled most criteria. Only five reviewed plans came within 10% of total

Duffy, David Cameron

366

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

367

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Broader source: Energy.gov (indexed) [DOE]

New Construction of Distribution Lines, Service Lines, and New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider New York State Public Service Commission Any proposed construction of distribution lines, service lines, and appurtenant facilities to electric utilities located near scenic areas of

368

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor  

Broader source: Energy.gov (indexed) [DOE]

1 1 Click to edit Master title style 15 kV Phase Leg Power Modules with SiC MIDSJT Devices Ranbir Singh and Siddarth Sundaresan GeneSiC Semiconductor Inc. ranbir.singh@genesicsemi.com +1 703 996 8200 43670 Trade Center Pl #155; Dulles VA 20166 September 27, 2012 Acknowledgement: The authors thank Dr. Imre Gyuk for funding this work and Dr. Stan Atcitty for technical supervision Sandia National Laboratories is a multi- program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DOE SBIR HV DC Link Grant #SC0008240 2 Phase Leg forms fundamental building block for AC/DC AND DC/AC Conversion

369

Decommissioning Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Decommissioning Plan Review Module Decommissioning Plan Review Module March 2010 CD-0 O 0 C OFFICE OF D C CD-1 F ENVIRO Standard R Decomm Rev Critical Decisi CD-2 M ONMENTAL Review Plan missioning view Module ion (CD) Ap CD March 2010 L MANAGE n (SRP) g Plan e plicability D-3 EMENT CD-4 Post Oper ration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

370

Project Execution Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

371

IDC Integrated Master Plan.  

SciTech Connect (OSTI)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

Clifford, David J.; Harris, James M.

2014-12-01T23:59:59.000Z

372

Modulation and SSR tests performed on the BPA 500 kV thyristor controlled series capacitor unit at Slatt substation  

SciTech Connect (OSTI)

Field experience is reported for a thyristor controlled series capacitor (TCSC) recently commissioned at BPA`s Slatt substation. Subsynchronous resonance tests show that TCSC interactions with shaft dynamics of PGE`s Boardman steam generator are well understood and are effectively avoided by normal TCSC valve firing logic. Modulation tests, performed with the Boardman plant off line, show that the TCSC can be a powerful and responsive actuator for swing damping. Security considerations did not permit lightly damped operation of the controlled plant. Close analysis indicates that the TCSC damping contribution, though small, was measurable. The best estimate is that damping for the McNary mode is 7.33% and 8.55%, for the TCSC damper loop open and closed respectively. TCSC testing and monitoring is facilitated by an advanced interactive measurement network representing BPA`s approach to the information requirements of major control systems.

Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States)] [Pacific Northwest Lab., Richland, WA (United States); Mittelstadt, W.A. [Bonneville Power Administration, Portland, OR (United States)] [Bonneville Power Administration, Portland, OR (United States); Piwko, R.J. [General Electric Co., Schenectady, NY (United States)] [General Electric Co., Schenectady, NY (United States); Damsky, B.L. [Electric Power Research Inst., Palo Alto, CA (United States)] [Electric Power Research Inst., Palo Alto, CA (United States); Eden, J.D. [Portland General Electric, OR (United States)] [Portland General Electric, OR (United States)

1995-07-01T23:59:59.000Z

373

Modulation and SSR tests performed on the BPA 500 kV thyristor controlled series capacitor unit at Slatt substation  

SciTech Connect (OSTI)

Field experience is reported for a thyristor controlled series capacitor (TCSC) recently commissioned at BPA`s Slatt substation. Subsynchronous resonance tests show that TCSC interactions with shaft dynamics of PGE`s Boardman steam generator are well understood and are effectively avoided by normal TCSC valve firing logic. Modulation tests, performed with the Boardman plant off line, show that the TCSC can be a powerful and responsive actuator for swing damping. Security considerations did not permit lightly damped operation of the controlled plant. Close analysis indicates that the TCSC damping contribution, though small, was measurable. The best estimate is that damping for the McNary mode is 7.33% and 8.55%, for the TCSC damper loop open and closed respectively. TCSC testing and monitoring is facilitated by an advanced interactive measurement network representing BPA`s approach to the information requirements of major control systems.

Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States)] [Pacific Northwest Lab., Richland, WA (United States); Mittelstadt, W.A. [Bonneville Power Administration, Portland, OR (United States)] [Bonneville Power Administration, Portland, OR (United States); Piwko, R.J. [General Electric Co., Schenectady, NY (United States)] [General Electric Co., Schenectady, NY (United States); Damsky, B.L. [Electric Power Research Inst., Palo Alto, CA (United States)] [Electric Power Research Inst., Palo Alto, CA (United States); Eden, J.D. [Portland General Electric, OR (United States)] [Portland General Electric, OR (United States)

1996-05-01T23:59:59.000Z

374

Apparent ridges for line drawing  

E-Print Network [OSTI]

Non-photorealistic line drawing depicts 3D shapes through the rendering of feature lines. A number of characterizations of relevant lines have been proposed but none of these definitions alone seem to capture all ...

Judd, Tilke (Tilke M.)

2007-01-01T23:59:59.000Z

375

JGI - Sequencing Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sequencing Plans Sequencing Plans JGI engages users from the National Laboratory system, academic institutions, and private industry to perform sequencing projects that directly relate to the DOE Office of Biological and Environmental Research's missions in alternative energy, global carbon cycling, and bioremediation. JGI's sequencing portfolio is drawn from its user programs, including the Community Science Program and the new Bioenergy Research Centers, as well as targets chosen by DOE to meet programmatic objectives. Plans by Program and Year All projects GEBA Sequencing Plans Community Science Program FY2014 Community Sequencing Program FY2013 Community Sequencing Program FY2012 Community Sequencing Program FY2011 Community Sequencing Program FY2010 Community Sequencing Program FY2009

376

Advance Care Planning Safeguards  

Science Journals Connector (OSTI)

Regardless of which goals of advance care planning are featured, safeguards, as reviewed in my article and by...5 we inadvertently may be doing harm.

J. Andrew Billings MD

2012-11-01T23:59:59.000Z

377

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 • Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

378

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

379

WATER CONSERVATION PLAN  

National Nuclear Security Administration (NNSA)

i WATER CONSERVATION PLAN TONOPAH TEST RANGE UNITED STATES DEPARTMENT OF ENERGY January 10, 2011 Prepared for: Tonopah Test Range Post Office Box 871 Tonopah, Nevada 89049 (702)...

380

Strategic Plan: 2014 - 2018  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

marketplace to an expanding customer base. EIA's program directly supports Goal 1 (Science and Energy) of DOE's 2014 Strategic Plan. Specifically, EIA has identified four...

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

382

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

383

Navajo Marketing Plan Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Navajo Surplus Marketing Reference Material Amended Navajo Marketing Plan AZ Water Settlements Act Colorado River Basin Project Act General Power Contract Provisions (GCPC) - 09...

384

BROMEX Logistics Meeting plan  

E-Print Network [OSTI]

BROMEX Logistics Meeting plan Fairbanks, Alaska 22-23 Feb 2011 #12;22 Feb 2011 ­ Photo taken by Son

Rigor, Ignatius G.

385

PROJECT MANAGEMENT PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7, 2011 Verification Method: Functional model module operating in decision support system Title: Water institutions tool: Phase I Planned Date: April 1, 2011 Verification...

386

BPA Energy Efficiency Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

387

MITG Test Plan  

SciTech Connect (OSTI)

The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

Eck, Marshall B.

1981-08-01T23:59:59.000Z

388

State Energy Strategic Planning  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

389

planning for emergencies  

National Nuclear Security Administration (NNSA)

1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

390

Strategic Energy Planning Process  

Broader source: Energy.gov [DOE]

The nine-step process for community strategic energy planning helps Tribes establish a comprehensive understanding of current energy use and costs, get insight into efficiency and conservation...

391

Motion planning algorithms for a group of mobile agents  

E-Print Network [OSTI]

sampling, like the probabilis- tic roadmap (PRM) planners [46, 47] have gained popularity due to their e–ciency 5 and simplicity. Centralized methods using PRM have been developed for solving the motion planning problem for multiple agents [48, 49...]. The no- tion of coordination diagram was used in [57] and later analyzed for manipulators in [60, 61]. On similar lines roadmap coordination [62, 63] was used to plan the motion of multiple robots. The problem with decoupled approaches is that despite...

Lal, Mayank

2008-10-10T23:59:59.000Z

392

Harry: Between the Lines  

E-Print Network [OSTI]

I 5. ; ..v^-rr>.>-'- j??!*f fefi ( -??;r' ,, ;rl&.i:-??t**rK&d t ? -?, .- 'c-y. ~ :'y$???M .'??. ??.v-'-/i / ' , *? I te / - 5- MAGNUM FORCE: HARRY Between The Lines by Ruth Kurz Seeing Harry, instead of The Callahan... Image. (1973) Special thanks to Teri White for the original "first time"*scene. Further thanks JL MW AW DMc A production of AD NAUSEUM PRESS 3613 West Park Road Cleveland, Ohio 44111 MAGNUM FORCE: HARRY Between The Lines by ruth kurz ' "I...

Kurz, R.; White, T.

1982-01-01T23:59:59.000Z

393

Health Education Lesson Plans Health Education Lesson Plans  

E-Print Network [OSTI]

Health Education Lesson Plans Health Education Lesson Plans (Healthy Kids Resource Center; no lesson plans to download, but library of health curriculum http://www.hkresources.org/ Dairy Council://www.epa.gov/teachers For Lesson Plans http://www.forlessonplans.com Health Lessons Plans Web Quest http://www.edhelper.com/cat55

de Lijser, Peter

394

GENERATION OF A 5A, 10kV HOLLOW ELECTRON BEAM BY A PIERCE GUN J.J. BARROSO, P.J. CASTRO, J.O. ROSSI, J.A.N. GONALVES, and H. PATIRE JR.  

E-Print Network [OSTI]

GENERATION OF A 5A, 10kV HOLLOW ELECTRON BEAM BY A PIERCE GUN J.J. BARROSO, P.J. CASTRO, J.O. ROSSI experienced by the electron beam propagating across the cavity. Here we describe a Pierce gun used of short-circuits. PULSE GENERATOR VIEW GUN OPERATION The gun cathode voltage is fixed at the nominal value

395

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

396

Hanford facility contingency plan  

SciTech Connect (OSTI)

The Hanford Facility Contingency Plan, together with each TSD unit- specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. Applicability of this plan to Hanford Facility activities is described in the Hanford Facility RCRA Permit, Dangerous Waste Portion, General Condition II.A. General Condition II.A applies to Part III TSD units, Part V TSD units, and to releases of hazardous substances which threaten human health or the environment. Additional information about the applicability of this document may also be found in the Hanford Facility RCRA Permit Handbook (DOE/RL-96-10). This plan includes descriptions of responses to a nonradiological hazardous substance spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. The term hazardous substances is defined in WAC 173-303-040 as: ``any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity, that exhibits any of the physical, chemical or biological properties described in WAC 173-303-090 or 173-303-100.`` Whenever the term hazardous substances is used in this document, it will be used in the context of this definition. This plan includes descriptions of responses for spills or releases of hazardous substances occurring at areas between TSD units that may, or may not, threaten human health or the environment.

Sutton, L.N.

1996-07-01T23:59:59.000Z

397

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

398

Walkability Planning in Jakarta  

E-Print Network [OSTI]

Integrated accessibility strategy and design Legibility Integrated activity Shared spaces Strategy 1: Policy Pedestrian planning as constituency buildingIntegrated activity study Inclusive road designation WikiPlaces pedestrian network mapping Vernacular placemaking and Asian shared street design Pedestrian planning as constituency building

Lo, Ria S. Hutabarat

2011-01-01T23:59:59.000Z

399

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600-2006-014 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION Jackalyne Pfannenstiel Chairman James D Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared

400

Corporate Plan Corporate Plan 2008-2011  

E-Print Network [OSTI]

Planned Income and Expenditure 26 Performance Measures Table 3 - Key Agency Targets 27 #12;3 | Corporate the difference between income raised and expenditure incurred. We operate in accordance with full resource levied on the capital value tied up in the national forest estate. The 2007 Spending Review allocated

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

PROJECT PLANNING TEMPLATE  

Broader source: Energy.gov (indexed) [DOE]

Plan i Issue Date: 4/24/2009 Plan i Issue Date: 4/24/2009 U.S. Department of Energy Office of Engineering and Construction Management Project Plan for the Project Assessment and Reporting System (PARS II) Version 2.0a (Public) April 20, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net PARS II Project Plan ii Issue Date: 4/24/2009 Title Page Document Name: Project Plan for the Project Assessment and Reporting System (PARS II), V2.0a Publication Date: April 24, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Judith Bernsen, PMC, LLC Kai Mong, Energy Enterprise Solutions, LLC

402

Commissioning Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

403

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

404

South Texas Planning Region Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC DEVELOPMENT PROGRAM By: KFH Group, Incorporated December.................................................................................................................................1 PLAN PROCESS .............................................................................................................................3 GOALS AND OBJECTIVES...

South Texas Development Council Economic Development Program

2006-12-15T23:59:59.000Z

405

Domain area planning utility (DAPU) for planning wireless battlefield networks  

Science Journals Connector (OSTI)

We describe the key design concepts of Domain Area Planning Utility (DAPU) developed by the PILSNER program to perform high-speed automated planning of Future Battlefield Networks (FBNs). DAPU processes multiple inputs from Resource Planning such as ...

Mariusz A. Fecko; John Unger; Sunil Samtani; Douglas Davey; Andrzej Cichocki; Bill Biagini; Paul Rego; Rick Stewart; Aristides Staikos

2009-10-01T23:59:59.000Z

406

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network [OSTI]

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

407

Energy Efficiency Market Sustainable Business Planning | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning, a presentation...

408

2012 DOE Strategic Sustainability Performance Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

409

Electrical Safety Assessment Plan--NNSA/NSO IOD Facility Representative,  

Broader source: Energy.gov (indexed) [DOE]

Electrical Safety Assessment Plan--NNSA/NSO IOD Facility Electrical Safety Assessment Plan--NNSA/NSO IOD Facility Representative, 12/03 Electrical Safety Assessment Plan--NNSA/NSO IOD Facility Representative, 12/03 An assessment of the Electrical Safety (ES) program at XXXX was conducted during the week of December XX-XX, 2003. The assessment team evaluated the program using the programmatic areas and specific Lines of Inquiry (LOI) contained in the approved Assessment plan provided. The team consisted of the Facility Representative from National Nuclear Security Administration, as well as ES, Subject Matter Expert support. The assessment plan identified 5 areas of review for Electrical Safety. An integrated process has been established to ensure electrical safety hazards are identified and that adequate controls are defined and

410

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

411

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

412

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

413

Renewables Portfolio Standard Procurement Plan  

E-Print Network [OSTI]

Renewables Portfolio Standard Procurement Plan November 2013 Roseville Electric 2090 Hilltop Circle Council will deliberate in public on the RPS Procurement Plan. Information distributed to the City Council regarding Roseville's renewable energy resources procurement status and future plans for consideration

414

FIRE MANAGEMENT PLAN MONTAGUE PLAIN  

E-Print Network [OSTI]

FIRE MANAGEMENT PLAN FOR MONTAGUE PLAIN WILDLIFE MANAGEMENT AREA #12;Fire Management Plan for Montague Plain Wildlife Management Area prepared for Massachusetts Dept. of Fisheries, Wildlife. 2003. Fire Management Plan for Montague Plain Wildlife Management Area. Department of Natural Resources

Schweik, Charles M.

415

Scha's Parallel Lines Bernhard Nickel  

E-Print Network [OSTI]

Scha's Parallel Lines Bernhard Nickel May 10, 2010 1 Introduction Scha (1981) has a famous example) The single lines run parallel to the double lines. 3 Code for Figure 1 \\begin{figure} \\centering \\setlength{\\unitlength}{.5in} \\begin{picture}(6,4) % first square \\put(0,4){\\line(1,0){4}}% \\put(0,1){\\line(1,0){4}}% \\put(0

Nickel, Bernhard

416

EMSL Strategic Plan 2008  

SciTech Connect (OSTI)

This Strategic Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

417

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

418

EMSL Contribution Plan  

SciTech Connect (OSTI)

This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSL’s detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

419

Environmental monitoring plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

420

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Building Technologies Office: Strategic Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plans to Strategic Plans to someone by E-mail Share Building Technologies Office: Strategic Plans on Facebook Tweet about Building Technologies Office: Strategic Plans on Twitter Bookmark Building Technologies Office: Strategic Plans on Google Bookmark Building Technologies Office: Strategic Plans on Delicious Rank Building Technologies Office: Strategic Plans on Digg Find More places to share Building Technologies Office: Strategic Plans on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home

422

Planning for Years to Come  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

423

Transition Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and training needs for system operation and maintenance, planning for data migration, etc Transition Plan More Documents & Publications System Design Feasibility Study Report...

424

Career Planning | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Development Plan, identifying your specific career goals and how you'll acquire the knowledge and develop the skills necessary to achieve them. Career planning and professional...

425

Research deciphers HIV attack plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

deciphers HIV attack plan Research deciphers HIV attack plan These findings will help inform vaccine design and interpretation of vaccine trials, and provide new insights...

426

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

427

Community Energy Stategic Planning Resources  

Broader source: Energy.gov (indexed) [DOE]

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

428

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Broader source: Energy.gov (indexed) [DOE]

Construction of Distribution Lines, Service Lines, and Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) < Back Eligibility Commercial Installer/Contractor Institutional Investor-Owned Utility Low-Income Residential Multi-Family Residential Municipal/Public Utility Residential Rural Electric Cooperative Schools Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any proposed construction of electricity-related facilities in residential

429

FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2010 Operational Plan FY2010 Operational Plan - Goal 1 Summary FY2010 Operational Plan - Goal 2 Summary FY2010 Operational Plan - Goal 3 Summary

430

Fast, accurate, and robust automatic marker detection for motion correction based on oblique kV or MV projection image pairs  

SciTech Connect (OSTI)

Purpose: A robust and accurate method that allows the automatic detection of fiducial markers in MV and kV projection image pairs is proposed. The method allows to automatically correct for inter or intrafraction motion. Methods: Intratreatment MV projection images are acquired during each of five treatment beams of prostate cancer patients with four implanted fiducial markers. The projection images are first preprocessed using a series of marker enhancing filters. 2D candidate marker locations are generated for each of the filtered projection images and 3D candidate marker locations are reconstructed by pairing candidates in subsequent projection images. The correct marker positions are retrieved in 3D by the minimization of a cost function that combines 2D image intensity and 3D geometric or shape information for the entire marker configuration simultaneously. This optimization problem is solved using dynamic programming such that the globally optimal configuration for all markers is always found. Translational interfraction and intrafraction prostate motion and the required patient repositioning is assessed from the position of the centroid of the detected markers in different MV image pairs. The method was validated on a phantom using CT as ground-truth and on clinical data sets of 16 patients using manual marker annotations as ground-truth. Results: The entire setup was confirmed to be accurate to around 1 mm by the phantom measurements. The reproducibility of the manual marker selection was less than 3.5 pixels in the MV images. In patient images, markers were correctly identified in at least 99% of the cases for anterior projection images and 96% of the cases for oblique projection images. The average marker detection accuracy was 1.4{+-}1.8 pixels in the projection images. The centroid of all four reconstructed marker positions in 3D was positioned within 2 mm of the ground-truth position in 99.73% of all cases. Detecting four markers in a pair of MV images takes a little less than a second where most time is spent on the image preprocessing. Conclusions: The authors have developed a method to automatically detect multiple markers in a pair of projection images that is robust, accurate, and sufficiently fast for clinical use. It can be used for kV, MV, or mixed image pairs and can cope with limited motion between the projection images.

Slagmolen, Pieter; Hermans, Jeroen; Maes, Frederik; Budiharto, Tom; Haustermans, Karin; Heuvel, Frank van den [Department of ESAT, Medical Image Computing, Catholic University Leuven, Leuven 3000 (Belgium) and Department of Radiology, Medical Image Computing, Catholic University Leuven, Leuven 3000 (Belgium); Department of Radiotherapy, University Hospitals Leuven, Leuven 3000 (Belgium)

2010-04-15T23:59:59.000Z

431

Sixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan  

E-Print Network [OSTI]

are organized by resource areas, Bonneville Power Administration, and Council monitoring activities. In manySixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan Introduction ................................................. 15 Future Role of Bonneville

432

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning  

E-Print Network [OSTI]

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning George into a microphone. Over thirteen hours of inter- action have been collected and transcribed (see (Gross, Allen

Ferguson, George

433

Magnetic field exposure assessment for adult residents of Maine who live near and far away from overhead transmission lines  

SciTech Connect (OSTI)

Sixty-Hz magnetic field exposures were measured for 45 adult residents of Maine. Thirty of the subjects resided near rights-of-way (ROWs) with either 345- and 115-kV transmission lines, or ROWs with only 115-kV transmission lines; fifteen resided far from any transmission lines. Personal exposure data for a single 24-hour period was acquired with the EMDEX. The EMDEX's event-marker button was used to partition exposures into Home and Away components. Also, three area measurements were taken for each subject during the personal exposure measurement period: (1) 24-hr fixed-site bedroom measurement with a second EMDEX; (2) Spot measurements in at least three rooms of every residence; and (3) Spot measurements outside each residence. Residence near transmission lines highly loaded during the measurement period was associated with increased Home and Total exposure relative to a far-away population. Average exposure level while away from home was uniform (at about 2 mG) throughout the study population. On a quantitative level, Home exposure was correlated equivalently with Spot-In (r = .70) and the 24-hr fixed site measurement (r = .68). Correlations of area measurements with Total exposure were weaker because of the dilution effect of Away exposure (r = .64 for Spot-In; r = .61 for 24-h Bedroom). Away and Home exposures were not correlated (r = .14), which reinforced our confidence that the participants used the EMDEX correctly. The data suggest the need for caution before inferences are drawn about total personal exposure from area measurements. The study demonstrates the feasibility of obtaining valid measures of magnetic-field exposure with the personal exposure monitors that have been developed.

Kavet, R.; Silva, J.M.; Thornton, D. (Enertech Consultants, Campbell, CA (United States))

1992-01-01T23:59:59.000Z

434

Policy & Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

435

DOE Retro Analysis Plan  

Broader source: Energy.gov (indexed) [DOE]

Retro Analysis Plan Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for Retrospective Analysis of Existing Rules. We are encouraged by DOE's efforts to implement Executive Order 13563. We appreciate the actions already taken by DOE to address our concerns regarding the Final Rule on Certification, Compliance, and Enforcement Regulations for Consumer Products and Commercial and

436

Plan Your School Visit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Your School Visit Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit Chaperones To ensure that your students have the best possible experience at the Museum, we ask that you provide one chaperone for every 6 children. The chaperones should stay with their assigned group of students throughout the entire visit and model positive behavior. General Before arriving at the Museum, please remind your students about the following guidelines: If possible, leave food and drinks on the bus. Respect other visitors in the Museum by using inside voices, walking, etc. Please be gentle with the exhibits. Cameras are welcome at the Bradbury Science Museum. Have fun! Upon your arrival

437

CURRICULUM VITAE RESEARCH PLAN  

E-Print Network [OSTI]

CURRICULUM VITAE & RESEARCH PLAN Erik Schwartz Sørensen Ph. D. Theoretical Condensed Matter Physics Contents Curriculum vitae 3 Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Recent Invited Talks 21 Referees 22 #12; Erik Sørensen February 19, 2001 3 Curriculum vitae

Sørensen, Erik S.

438

Financial Planning Resource Allocation  

E-Print Network [OSTI]

Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

Barrash, Warren

439

Advance Care Planning Safeguards  

Science Journals Connector (OSTI)

To the Editors:—We read with interest the recent article by Dr. Billings.1...In the article, Dr. Billings defines the goal of advance care planning as promoting the autonomy of decisionally incapac...

Sangeeta C. Ahluwalia PhD; MPH; Howard S. Gordon MD

2012-11-01T23:59:59.000Z

440

Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Developing a Marketing Plan  

E-Print Network [OSTI]

Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

2009-03-02T23:59:59.000Z

442

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

443

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

444

Technical Planning Basis  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

2007-07-11T23:59:59.000Z

445

2014- 2018 Strategic Plan  

Broader source: Energy.gov [DOE]

In April 2014, The Department of Energy released its 2014 - 2018 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by...

446

Strategic Plan: Implementation and  

E-Print Network [OSTI]

Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement ­ "Core Purpose" Vision Statement

Nguyen, Danh

447

Milestone Plan Process Improvement  

Broader source: Energy.gov (indexed) [DOE]

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

448

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

449

20120131 DOE Congestion Study Clean Line Comments 2012  

Broader source: Energy.gov (indexed) [DOE]

UNITED STATES DEPARTMENT OF ENERGY UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY 2012 NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY COMMENTS OF CLEAN LINE ENERGY PARTNERS LLC January 31, 2012 Clean Line Energy Partners LLC ("Clean Line") respectfully submits these comments in response to the Department of Energy's ("DOE") Plan for Conduct of 2012 Electric Transmission Congestion Study ("Congestion Study") as published in the Federal Register on November 11, 2011. Clean Line appreciates the DOE's renewed efforts to gather and review existing and new transmission data across the nation (as per 76 FR 70122) to develop a list of congestion areas that may be eligible for backstop authority under 216a of the Federal Power

450

Site Sustainability Plan  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy U.S. Department of Energy Office of Legacy Management December 2013 LMS/S07225 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Site Sustainability Plan December 2013 Doc. No. S07225 Page i Contents Abbreviations ................................................................................................................................. iii I. Executive Summary ...............................................................................................................1 II. Performance Review and Plan Narrative ...............................................................................9 1 GHG Reduction and Comprehensive GHG Inventory ...........................................................9

451

Greenhouse Gas Mitigation Planning  

Broader source: Energy.gov [DOE]

The Greenhouse Gas (GHG) Mitigation Planning section provides Federal agency personnel with guidance to achieve agency GHG reduction goals in the most cost-effective way. Using a portfolio-based management approach for GHG mitigation planning, agencies will be able to prioritize strategies for GHG mitigation. Agencies can also use this guidance to set appropriate GHG reduction targets for different programs and sites within an agency.

452

Lubbock Metropolitan Transportation Plan  

E-Print Network [OSTI]

in the foreground and the Lubbock Area Veterans Memorial in the background EXECUTIVE SUMMARY This Metropolitan Transportation Plan was developed based upon the four Lubbock Metropolitan Planning Organization?s (MPO) goals of Improve Safety ? Congestion...: researching proposed routes; studying environmental impacts; performing engineering surveys; holding public hearings; signing agreements with the counties or cities (if needed to fulfill state or federal requirements); acquiring right-of-way; producing...

Lubbock Metropolitan Planning Organization

2007-09-18T23:59:59.000Z

453

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

454

OSU Bicycle Plan 2/10 OSU Bicycle Plan  

E-Print Network [OSTI]

OSU Bicycle Plan 2/10 DRAFT OSU Bicycle Plan Introduction Goals and Performance Measures (statistics and data points) Bicycle Network (circulation and parking) Bicycle Programs (incentives, outreach, education and enforcement) Improvement Plan #12;OSU Bicycle Plan 2/10 Introduction The 2010 Oregon State

Escher, Christine

455

Faculty of Medicine Annual Performance Review: Your Personal Review and Development Plan (PRDP)  

E-Print Network [OSTI]

Faculty of Medicine Annual Performance Review: Your Personal Review and Development Plan (PRDP) Performance review between staff and their line managers is essential. It allows discussion of any problems to get the most out of your PRDP by attending an appropriate course: http://www3.imperial.ac.uk/staffdevelopment/ldc/planning

456

Medial Axis Local Planner: Local Planning for Medial Axis Roadmaps  

E-Print Network [OSTI]

implemented this local planner and have tested it in 2D and 3D rigid body and 8D and 16D fixed base articulated linkage environments. We compare MALP with a straight-line local planner (SL), a typical local planer used in motion planning that interpolated...

Manavi, Kasra Mehron

2012-07-16T23:59:59.000Z

457

CSPH 3101: ECOSYSTEMS OF WELLBEING UMORE Park Design Plan  

E-Print Network [OSTI]

CSPH 3101: ECOSYSTEMS OF WELLBEING UMORE Park Design Plan Envision a Dynamic Community of Wellbeing for innovation that can be exported outside of its boundaries. Umore Park: Ecosystems of Infrastructure it every day in the form of roads, buildings, power lines, stoplights, energy plants, water pipes, when

Netoff, Theoden

458

CRAD, Conduct of Operations Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations Assessment Plan Conduct of Operations Assessment Plan CRAD, Conduct of Operations Assessment Plan Performance Objective: The purpose of this assessment is to verify programmatic implementation of DOE O 5480.19, "Conduct of Operations Requirements of DOE Facilities" Criteria: Operations at DOE facilities shall be conducted in a manner to assure an acceptable level of safety. (DOE O 5408.19 Conduct of Operations for DOE Facilities) Operators at facilities shall have procedures in place to control the conduct of their operations. (DOE O 5408.19 Conduct of Operations for DOE Facilities) Line organizations shall review existing and planed programs important to safe and reliable facility operations. (DOE O 5408.19 Conduct of Operations for DOE Facilities) Line organizations shall assess the effectiveness of corporate

459

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

460

2012 Wind Technologies Market Report  

E-Print Network [OSTI]

line in 2013. Both 345-kV transmission line projects have aa proposed 345-kV transmission line aimed at transferringThe 500-kV, 110-mile Sunrise Powerlink transmission line was

Wiser, Ryan

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Optimal Interdiction of Attack Plans Joshua Letchford  

E-Print Network [OSTI]

Economics, Security, Algorithms Keywords Game theory, security, planning, plan interdiction 1. INTRODUCTION

Vorobeychik, Eugene

462

Windward Community College Strategic Plan  

E-Print Network [OSTI]

.......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

463

UNL CAMPUS & LANDSCAPE MASTER PLANS  

E-Print Network [OSTI]

are to both support the upkeep and maintenance of existing landscapes on campus and to support the designPLAN BIG UNL CAMPUS & LANDSCAPE MASTER PLANS NOVEMBER 2013 #12;#12;PLAN BIG ARCHITECTURAL AND LANDSCAPE GUIDELINES #12;4 #12;5 TABLE OF CONTENTS INTRODUCTION Purpose and Introduction 6 The Plan Big

Farritor, Shane

464

REVIEW PLAN PINE CREEK LAKE  

E-Print Network [OSTI]

#12;REVIEW PLAN PINE CREEK LAKE McCurtain County, Oklahoma DAM SAFETY MODIFICATION STUDY TULSA LEFT BLANK #12;REVIEW PLAN Pine Creek Lake, Oklahoma Dam Safety Modification Study TABLE OF CONTENTS and Costs 17 13. Public Participation 19 14. Review Plan Approval and Updates 19 15. Review Plan Points

US Army Corps of Engineers

465

EIS-0472: Mitigation Action Plan  

Broader source: Energy.gov [DOE]

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

466

Plans, Implementation, and Results Glossary  

Office of Energy Efficiency and Renewable Energy (EERE)

Definitions of the office overview, plans, implementation, and results document and website categories are provided below:

467

RHIC Machine/Detector Planning Meetings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RHIC Machine/Detector Planning Meeting RHIC Machine/Detector Planning Meeting RHIC STAR PHENIX RHIC STAR PHENIX BNL Home Page C-AD Home Page C-AD ES&F Division BNL Physics Department RHIC Run History Super Conducting Magnet Division Run 14 Scheduling Physicist Home Page NPP PAC Run 13 Recommendations CAD Power Run 11-Run 13 Off-line CNI Polarization Results APEX for Run 13 RHIC Machine/Detector Meetings for Run 12 FY02-Present C-AD Energy Use Plots Cryo Power Run 11-Run 13 H-jet Target Results APEX Nov. 19-20, 2012 Workshop for Run 13 RHIC Run 13 Run Home Page (pp) FY10-Present BNL Energy Use Plot Cryo Temperatures Latest Luminosity Plots BNL Current Energy Use (BNL Intranet only and requires password) RHIC Retreat 2012

468

Utility Lines and Facilities (Montana)  

Broader source: Energy.gov [DOE]

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

469

a 115-line MATLAB implementation  

E-Print Network [OSTI]

Apr 15, 2013 ... Alternating active-phase algorithm for multimaterial topology optimization problems -- a 115-line MATLAB implementation. Rouhollah Tavakoli ...

Rouhollah Tavakoli

2013-04-15T23:59:59.000Z

470

,"Table 6. Proposed High-voltage Transmission Line Additions...  

U.S. Energy Information Administration (EIA) Indexed Site

,2010,"US","WECC","NORW","AC","300-399","300-399",1398,6,2011,"South Jordan, UT","SLC,UT",0,"OH",,,14354,"PACE","I",100,"Camp Williams- Terminal 345 kV 1...

471

ANALYSIS OF THE CALIFORNIA ENERGY INDUSTRY  

E-Print Network [OSTI]

Coal train Coal truck 230 kV AC transmission line 345 kVAC transmission line 500 kV AC transmission line Electricity

Authors, Various

2010-01-01T23:59:59.000Z

472

TWRS retrieval and disposal mission, immobilized high-level waste storage plan  

SciTech Connect (OSTI)

This project plan has a two fold purpose. First, it provides a plan specific to the Hanford Tank Waste Remediation System (TWRS) Immobilized High-Level Waste (EMW) Storage Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestone M-90-01 (Ecology et al. 1996) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan. Second, it provides an upper tier document that can be used as the basis for future subproject line item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 (DOE 1992a) and 430.1 (DOE 1995)). The format and content of this project plan are designed to accommodate the plan`s dual purpose. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.

Calmus, R.B.

1998-01-07T23:59:59.000Z

473

Agent Program Planning Information Money Smart  

E-Print Network [OSTI]

Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

474

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

475

CORONAL EMISSION LINES AS THERMOMETERS  

SciTech Connect (OSTI)

Coronal emission-line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G., E-mail: judge@ucar.ed [High Altitude Observatory, National Center for Atmospheric Research , P.O. Box 3000, Boulder CO 80307-3000 (United States)

2010-01-10T23:59:59.000Z

476

Why Neutrino Lines are Hypersharp  

E-Print Network [OSTI]

It was recently pointed out that mono-energetic neutrino lines from the 2-body decay of tritium (tau ~ 18-y) can be emitted, a significant fraction, with natural line width (~10-24 eV) for hypersharp resonance transitions 3H--> line broadening in resonances of short lived (tau ~ microsec) states.

R. S. Raghavan

2009-08-20T23:59:59.000Z

477

Coronal emission lines as thermometers  

E-Print Network [OSTI]

Coronal emission line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G

2009-01-01T23:59:59.000Z

478

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

479

Pecos River Watershed Protection Plan Update  

E-Print Network [OSTI]

that connects the pump, distribution tank and holding ponds. As of April 15, 2013, three of the ponds were completed and have been lined with a synthetic liner to prevent seepage and leakage as this was a major problem in early projects. Pecos River WPP...Pecos River Watershed Protection Plan Update Funding Provided by the Texas State Soil and Water Conservation Board through a Clean Water Act §319(h) Nonpoint Source Grant from the U.S Environmental Protection Agency TR-447 October 2013 Pecos River...

Gregory, L.; Hauck, L.; Blumenthal, B.; Brown, M.; Porter, A.

2013-01-01T23:59:59.000Z

480

Alaska Strategic Energy Plan and Planning Handbook | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building. The Handbook: Provides a step-by-step process that Alaska Native villages and communities may wish to use as a roadmap for discussion and decisions related to strategic energy planning and energy project prioritization Includes blank text boxes for communities to input their own

Note: This page contains sample records for the topic "kv line planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

DRAFT Bear Safety Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bear Safety Plan June 2010 Bear Safety Plan June 2010 NSA_bsp_Rev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Bear Safety Plan Background As a major part of DOE's participation in the US Global Change Research Program (USGCRP), the North Slope of Alaska (NSA) and Adjacent Arctic Ocean (AAO) Climate Research Facility (ACRF) exists on the North Slope of Alaska with its Central Facility near the town of Barrow. A secondary facility exists at Atqasuk, a town 100km inland from Barrow. Other instrumentation locations in more remote areas on the North Slope may be established in later stages of the project. Polar bears, and to a lesser extent, brown bears (barren ground grizzly) are significant hazards within the ACRF/NSA/AAO

482

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

483

Report: Strategic Planning Impacts  

Broader source: Energy.gov (indexed) [DOE]

Strategic Planning Impacts Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM complex will also help to lower overall lifecycle costs, create jobs, and allow the program to capitalize on its past successes. Implementation of ARRA is a high-visibility endeavor that has the potential to impact the EM base program's day-to-day operations and processes.

484

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Peter Lenentine, Director IM Organization Structure (as of 12/19/2013) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) TheAnne Gordon Technology Evaluation Office (IM-50) Peter Tseronis, Director (Acting) Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services John Berthiaume (Acting) Human Capital and Administrative

485

Customer Service Plan  

Broader source: Energy.gov (indexed) [DOE]

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

486

MITIGATION ACTION PLAN  

Broader source: Energy.gov (indexed) [DOE]

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

487

INL Executable Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ID-11383 ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 (This Page Intentionally Left Blank) DOE/ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 Prepared for the U.S. Department of Energy DOE Idaho Operations Office (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report DOE/ID-11383 Revision 2 December 2010 Approved By: ~~~/ Jeffrey~USseau Fa~ 7 Dlte President and General Manager , - Bechtel BWXT Idaho, LLC Advanced Mixed Waste Treatment Project (This Page Intentionally Left Blank)

488

DOE CONTRACTOR PENSION PLANS  

Broader source: Energy.gov (indexed) [DOE]

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

489

High Risk Plan  

Broader source: Energy.gov (indexed) [DOE]

Risk Plan Risk Plan John Bashista Melissa Rider Jeff Davis Timeline to date * OMB memo on Improving Government Acquisition issued July 29, 2009 - Review existing contracts and acquisition practices to save 7% of baseline contract spending (3.5% in FY 2010 and 3.5% in FY 2011) - Reduce high risk contracts by 10% the share of dollars obligated in FY2010 - Final plan was due and submitted on November 2, 2009 - OMB reviewed and requested revision Dec 23, 2009 - Revision submitted April 21, 2010 M&Os are an Issue * With respect to reductions in high risk contracting strategies, the M&O contracts was also a challenge since the opportunity to further influence competition and contract type was highly constrained. The Department had already competed approximately 85 percent of its M&O

490

Standard Review Plan Overview  

Broader source: Energy.gov (indexed) [DOE]

Technical Framework for EM Projects Critical Decision (CD) Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission-critical projects/facilities. Coupled with this ongoing mission is the added responsibility for EM to diligently leverage and apply American Recovery and Reinvestment Act (ARRA) funds to accelerate the completion of its

491

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Carol Blackston, Director (Acting) IM Organization Structure (as of 1/13/2014) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) Russell Pereira (Acting) Associate CIO for Technology Evaluation and Chief Technology Officer (IM-50) Peter Tseronis Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services Steve Cox (Acting)

492

Human Capital Plan  

Broader source: Energy.gov (indexed) [DOE]

Plan Plan Bea Dukes Melissa Rider AHCP Issues  Decentralization of Contracting Process within DOE  In spite of MA and CFO guidance, the actual (FTE) growth of Acquisition Workforce depends on Program Office and/or site level management Recap of this year's planning process  Thanks for your efforts on the development and consolidation of this year's AHCP  Collaborative effort with most HCA level activities  A few glitches ◦ OMB Template very confusing and required much clarification ◦ Many changes throughout the process  Thanks for your patience ◦ Lesson Learned: SPE, CFO, HC and Program Offices must be in synchronization Fallout  Additional funding called out in FY11 -

493

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

494

Energy Organizational Planning  

SciTech Connect (OSTI)

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

495

2.3-MW Medium-Voltage, Three-Level Wind Energy Inverter Applying a Unique Bus Structure and 4.5-kV Si/SiC Hybrid Isolated Power Modules: Preprint  

SciTech Connect (OSTI)

A high-efficiency, 2.3-MW, medium-voltage, three-level inverter utilizing 4.5-kV Si/SiC (silicon carbide) hybrid modules for wind energy applications is discussed. The inverter addresses recent trends in siting the inverter within the base of multimegawatt turbine towers. A simplified split, three-layer laminated bus structure that maintains low parasitic inductances is introduced along with a low-voltage, high-current test method for determining these inductances. Feed-thru bushings, edge fill methods, and other design features of the laminated bus structure provide voltage isolation that is consistent with the 10.4-kV module isolation levels. Inverter efficiency improvement is a result of the (essential) elimination of the reverse recovery charge present in 4.5-kV Si PIN diodes, which can produce a significant reduction in diode turn-off losses as well as insulated-gate bipolar transistor (IGBT) turn-on losses. The hybrid modules are supplied in industry-standard 140 mm x 130 mm and 190 mm x 130 mm packages to demonstrate direct module substitution into existing inverter designs. A focus on laminated bus/capacitor-bank/module subassembly level switching performance is presented.

Erdman, W.; Keller, J.; Grider, D.; VanBrunt, E.

2014-11-01T23:59:59.000Z

496

ISM Plan - Chemical Sciences Division - Revised May 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ISM Plan - Chemical Sciences Division - Revised May 2012 ISM Plan - Chemical Sciences Division - Revised May 2012 Page 2 of 25 Page intentionally left blank ISM Plan - Chemical Sciences Division - Revised May 2012 Page 3 of 25 Chemical Sciences Division ISM Plan May 2012 Page 1.0 Policy Statement 5 2.0 Description of Division/Organization, Mission and Scope of Work 5 3.0 Accountability 7 3.01 Line Management Responsibility and Accountability 8 3.02 Specific Principal Investigator Responsibilities 8 3.03 Work Lead EH&S Responsibilities 8 3.04 CSD personnel EH&S Responsibilities (Non-Supervisor or Work Lead) 9 3.05 Students 10 3.06 Work Off-Site 10 3.07 Telecommuting 11

497

Getting the Crop to Market: Siting and Permitting Transmission Lines on Buffalo Ridge, Minnesota  

Science Journals Connector (OSTI)

Publisher Summary The rapid development of wind technology in southwest Minnesota has prompted the need to improve the transmission system in this area. The Minnesota Public Utilities Commission approved four major transmission line projects in 2003 to meet this need, including an 87-mile 345 kV transmission line. Northern States Power Company, d/b/a Xcel Energy, currently is involved in the State siting process with the projects and has been gathering public and agency input. Gathering the information early in the process has proven to be invaluable in deciding route locations and permitting strategies. In addition, public reception for the projects has been primarily positive since these facilities will allow additional wind generation to be developed in the area. This chapter describes the Xcel Energy projects, public reactions to the project, and the routing and siting issues, including some unique to these projects. Xcel Energy will highlight the primary lessons learned that can be used in future projects for routing transmission lines.

Michelle F. Bissonnette; Angela G.L. Piner; Pamela J. Rasmussen

2008-01-01T23:59:59.000Z

498

EMSL Strategic Plan 2008  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7753 7753 EMSL Strategic Plan 2008 AA Campbell August 2008 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 iii Environmental Molecular Sciences Laboratory Strategic Plan Our Mission EMSL, a U.S. Department of Energy national scientific user facility located at Pacific Northwest National Laboratory, provides integrated experimental and computational resources for discovery and technological innovation in the environmental molecular

499

PICs Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-2301 WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-2301 i Table of Contents List of Tables .....................................................................................................................ii

500

Strategic Action Plan  

Broader source: Energy.gov (indexed) [DOE]

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level