Powered by Deep Web Technologies
Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

15KV Class 25KVA Single-Phase IUT Prototype Development, Testing, and Performance Verification  

Science Conference Proceedings (OSTI)

EPRI is leading the development and demonstration of fully integrated, production-grade 4-kV and 15-kV-class solid-state transformers for integrating energy storage technologies and electric vehicle (EV) fast charging. The development team includes utilities, power electronics experts, and a transformer manufacturer to provide guidance on taking the technologies from concept to production. The intelligent universal transformer (IUT) technology has been validated through development and lab testing, ...

2013-12-12T23:59:59.000Z

2

100-kVA Intelligent Universal Transformer Development  

Science Conference Proceedings (OSTI)

This status report documents the design and development of EPRI's 100-kVA Intelligent Universal Transformer (IUT).

2008-12-16T23:59:59.000Z

3

EA-1671: Big River Substation to Poston Substation 69-Kilovolt...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Line Project, Arizona and California EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California Summary The...

4

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

5

EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

62: Construction and Routine Operation of a 12-kilovolt 62: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California SUMMARY This EA evaluates the environmental impacts of the proposal to install an overhead powerline extension from the U.S. Department of Energy's Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, which will significantly reduce NPR-1's overall utility costs. NPR-1 is known as Elk Hills oil field and is located in the southern San Joaquin Valley,

6

Demonstration Project for a 300 kVA Dynamic Sag Corrector  

Science Conference Proceedings (OSTI)

The dynamic sag corrector (DySC) represents a relatively new technology for mitigating voltage sags in a cost-effective manner. The device -- which comes in sizes ranging from 1 kVA to 2 MVA -- can provide ride-through during voltage sags to 50 percent of nominal voltage for up to 12 cycles with no energy storage. This report documents the installation, testing, and performance of a 300-kVA ProDySC, with optional energy storage capacitors.

2001-10-23T23:59:59.000Z

7

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

8

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

9

Testing and Development of a 30-kVA Hybrid Inverter: Lessons Learned and Reliability Implications  

SciTech Connect

A 30-kVA Trace Technologies hybrid power processor was specified and tested at the Sandia inverter test facility. Trace Technologies involving the control system, in response to suggestions made modifications, primarily by Sandia and Arizona Public Service (APS) personnel. The modifications should make the inverter more universally applicable and less site-specific so that it can be applied in various sites with minimal field interaction required from the design engineer. The project emphasized the importance of battery management, generator selection, and site load management to the performance and reliability of hybrid power systems.

Ginn, J.W.

1998-12-21T23:59:59.000Z

10

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

11

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

12

Proposed Norton-Tesuque 115 kV overhead transmission line and substation in Sante Fe, New Mexico  

SciTech Connect

Construction is proposed of a 115/12.5-kilovolt (kV), 10/12.5-megavolt-ampere (MVA) substation in the Tesuque area and of 9.02 miles of 115-kV overhead transmission line from the Norton Station to the new substation in an area approximately three miles north of Sante Fe, New Mexico. The project would involve the granting of a 100-foot width right-of-way by the Tesuque Pueblo, the construction of the substation on the Tesuque Pueblo Indian Reservation between the Rio Tesuque and New Mexico 85, the addition of a 115-kV breaker bay at Norton Station, and the installation of two underground 12.47-kV distribution feeders to connect to existing ones in the Tesuque area. In addition, the station would be designed to accommodate one future underground 12.47-kV feeder that would terminate at a future distribution line in the Tesuque area. The preferred transmission line route would originate at the Norton Station and proceed east-northeast up Calabasa Arroyo to a point approximately 1.1 miles north of the southwest corner of the Tesuque Pueblo boundary. From this point the route would proceed east to the proposed substation site.

1985-06-01T23:59:59.000Z

13

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

14

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

15

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

16

STABILIZED HIGH INTENSITY SOURCE OF 80 kv  

SciTech Connect

With the change of the current load from 0 to 2.5 mamp and simultaneous change of incoming intensity from 270 to 190 v, the stabilized high-intensity source changes less than l%.. The stabilized intensity can be arranged in steps of 5 kv from 60 to 80 kv. The high-intensity stabilizer automatically switches on upon reaching 60 kv. (tr-auth)

Polivanov, V.V.; Izyurov, A.V.; Pyatakov, N.I.

1959-09-01T23:59:59.000Z

17

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

18

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

19

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

20

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Glossary | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

K Kelvin. kg Kilogram. Kilovolt-Ampere (KVA) Where the term "kilovolt-ampere" (KVA) is used, it is the product of the line current (amperes) times the nominal system voltage...

22

Alameda 115-kV project  

SciTech Connect

Faced with an increasing demand for electricity, the Bureau of Electricity in Alameda, California decided to investigate alternative means to increase reliability, reduce losses and provide for economic expansion of the power supply system. The investigation indicated the need for 115-kV service to interconnect the Pacific Gas and Electric Company Substation C in Oakland with the Bureau's Atlantic Substation on Alameda Island, a distance of approximately 1.5 miles. Detailed planning and design for the 115-kV project was undertaken. Extensive studies were performed to select the route and determine the design. The studies are described.

1985-01-01T23:59:59.000Z

23

Test and demonstration report on single and three phase 60 to 400 hz sleep inverter 3. 75kva Gulton model emir302  

SciTech Connect

This Test and Demonstration Report presents the Test Plan and the results of the tests performed on SLEEP Inverter, Gulton Model EMIR302. The objective of the overall program is to design, develop, fabricate and test the 120V, 60 to 400Hz, 3.75KVA SLEEP Inverter in accordance with the requirements of U. S. Army Mobility Equipment Research and Development Command Specification EED 76 022501.

Rance, J.

1979-03-20T23:59:59.000Z

24

Cable System Technology Review of XLPE EHV Cables: 220 kV to 500 kV  

Science Conference Proceedings (OSTI)

Utilities in North America are now evaluating the first long-length circuits of extruded cross-linked polyethylene (XLPE) cable systems containing many joints at rated voltages 220 kV, 230 kV, and 345 kV. Of interest is whether the design, manufacture, and installation of XLPE extra-high-voltage (EHV) cable systems has been sufficiently demonstrated to satisfy utilities that it can provide reliable service for their particular applications. This report reviews the worldwide state of the art, gives method...

2002-12-16T23:59:59.000Z

25

Operation of a long-term transient monitoring system in a 138-KV and a 500-KV substation  

SciTech Connect

This paper describes the operating performance of automatic transient monitoring laboratories designed to capture fault and transient data on power systems. Laboratories were installed in a 138-kV and a 500-kV substation and operated for more than 25,000 hours over a three-year period. Recorded during this period were 341 events consisting of lightning, switching, and fault transients. These results provide invaluable data on actual transients in power systems to aid power system equipment designers.

Perkins, M.D.; Mauser, S.F.; Mikell, D.C.; Nilsson, S.L.

1984-08-01T23:59:59.000Z

26

1200-kV future seen; automated distribution dangers  

SciTech Connect

A major problem facing the electric-utility industry concerns power-transmission corridors. The corridors serving the nation's power needs may not be available in sufficient numbers to meet growing electricity demand. The difficulty in locating new power corridors will necessitate the transmission of increased power along pathways already available. The possibility of open-transmission systems going to 1200 kV is being researched at Westinghouse Electric Corporation. While much of the technology for 1200-kV transmission is being demonstrated currently (such as transformers, puffer-breakers, lightning arrestors, and reactors), the public fear of low-level radiation and excessive noise may make construction of 1200-kV open substations near the load virtually impossible. The implications of not having sufficient load capability to meet demand concern Westinghouse officials. The possibility of involuntary power rationing could require social and political solutions instead of technical ones. (SAC)

1980-07-01T23:59:59.000Z

27

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

28

230 kV operation of a substation designed for 115 kV by controlling voltage transients  

SciTech Connect

Arresters applied at the terminals of gas insulated substations have been used successfully for protection from switching and lightning surges. This arrester application for gas insulated substations permits the use of lower insulation levels and therefore more economical substations. In principle, the same technique can be applied to air insulated substations. This paper describes the analysis of transient voltages in a substation designed for 115 kV which is scheduled for operation at 230 kV. Both arrester rating and location are considered in this analysis. It is shown that complete substation protection is possible by addition of both arresters and capacitors.

Lannes, W.J.; Cheramie, W.J.; Priest, K.W.; Wilhelm, M.R.

1984-09-01T23:59:59.000Z

29

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

30

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

Science Conference Proceedings (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

31

EIS-0450: TransWest Express 600 kV Direct Current Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in...

32

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at medium voltages * 13.8 kV and 4.16 kV are commonly used voltages * Silicon Carbide high voltage devices play a pivotal role at these voltages 6 Multilevel vs Two-Level...

33

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to provide notification of any and all 230kV planned and unplanned outages at Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating...

34

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties,...

35

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

36

ETM (Distribution Network Automation on 10 kV cable line stations...  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

37

A 50 kV solid state multipulse kicker modulator  

DOE Green Energy (OSTI)

Performance requirements, design concepts, and test results for a prototype multipulse kicker modulator based on solid-state switches and a voltage-adding transformer topology are described. Tape-wound cores are stacked to form the transformer primary windings and a cylindrical pipe that passes through the circular inner diameters of the cores serves as the secondary winding of the step-up transformer. Boards containing MOSFET switches, trigger circuitry, and energy-storage capacitors plug into the core housings. A 50 kV prototype modulator that meets most of the facility requirements has been designed, fabricated, and tested at LLNL. More recent work has been concerned with designing and testing cores and boards with the full volt-second capability needed for 24-pulse operation. Results of the 50 kV prototype tests, preliminary tests of the full-volt-second cores and boards, and future development needs are described.

Walstrom, P. L. (Peter L.); Cook, E. G. (Edward G.)

2003-01-01T23:59:59.000Z

38

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high voltage GaAs photoguns have been built at Jefferson Lab based on a compact inverted insulator design. One photogun provides the polarized electron beam at CEBAF and operates at 130 kV bias voltage. The other gun is used for high average current lifetime studies at a dedicated test facility and has been operated at bias voltage up to 225 kV. The advantages of higher DC voltage for CEBAF include reduced space-charge emittance growth and the potential for prolonged photocathode lifetime. However, a consequence of operating at higher voltages is the increased likelihood of field emission or breakdown, both of which are unacceptable. Highlights of the R&D studies leading toward a production 200keV GaAs photogun for CEBAF will be presented.

J.M. Grames, P.A. Adderley, J. Clark, J. Hansknecht, M. Poelker, M.L. Stutzman, R. Suleiman, K.E.L. Surles-Law

2011-03-01T23:59:59.000Z

39

Retrofit of an existing 160 MVA 69KV major Chicago downtown substation to 200 MVA 138KV while maintaining continuity of service  

SciTech Connect

In 1957 Transmission Substation 68, LaSalle, (TSS 68) was placed in service. This paper reports that the station consists of four 40 MVA 69 kV/12 kV transformers which feed two 12 kV ring buses. The 12 kV switchgear is housed on the first and second floors of a 62 year old structurally sound building. Located on the south and west sides of this building are the four transformers. The entire station is located on a parcel of land approximately 14,000 square feet.

Czernenko, G.P. (Commonwealth Edison Co., Chicago, IL (United States))

1992-01-01T23:59:59.000Z

40

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison: Final Report  

Science Conference Proceedings (OSTI)

Following up the successful testing of a complete 50 m, 115 kV high temperature superconducting (HTS) power cable system prototype, EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation undertook a project to design, install, and operate a 24 kV HTS power cable at Detroit Edison's Frisbie substation to serve customer load. The demonstration cable circuit ran approximately 120 m between the 24 kV bus distribution bus and a 120 kV-24 kV tr...

2004-12-22T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

42

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

43

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

44

765kV Transmission line Voltage gradient  

E-Print Network (OSTI)

Corona ring Transmission lines Nowadays, due to the ever increasing energy consumption and power supply optimization, it is required to construct new power plants, substations and transmission lines. In Iran, also, because of increasing demand for electrical energy, for a significant power loss reduction in power transmission over long distances, and to construct high transmission lines that lead to reduction in the economic costs of transmission lines, the transmission lines must be considered at extra high voltage (EHV) levels. These EHV levels should be compared with the low voltage levels in order to extract the benefits. Therefore, in this paper, a review has been conducted on the types of 765 kV transmission lines used in different countries and a comparison between them and the low voltage levels have been performed. Accordingly, the advantages of EHV transmission lines are summarized. Finally, designing a line of 765 kV single-circuit with 6 conductors per bundle based on existing standards is presented.

unknown authors

2012-01-01T23:59:59.000Z

45

Design of the Atlas 240 kV Marx modules  

DOE Green Energy (OSTI)

A prototype 240 kV, oil-insulated Marx module has been designed and constructed at the Los Alamos National Laboratory (LANL). The prototype will be used for testing and certifying the design of the Marx module and certain components, including the closing switches, series resistor, and the capacitors themselves. The prototype will also be used to evaluate proposed mechanical systems designs. Information gained from the construction and testing of the 4-capacitor prototype will be folded into the design of the 16-capacitor maintenance unit. The prototype module consists of four 60 kV capacitors, two closing switches, one shunt resistor, and one series resistor. Cables are used to deliver the current to a dummy load scaled to match Atlas system parameters. The Marx unit is contained in a structure made from G-10, suspended from a steel frame that also serves to support components of the trigger, charging, and control system. Appropriate safety and charging systems are an integral part of the prototype design.

Bowman, D.W.; Bennett, G.; Biehl, F. [and others

1997-06-01T23:59:59.000Z

46

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

47

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

48

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's...

49

Geomagnetically Induced Current Estimation in the Wisconsin 345-kV Power Grid  

Science Conference Proceedings (OSTI)

This technical update presents the results from a project to assess space weather effects on the Wisconsin 345-kV power transmission grid.

2008-08-21T23:59:59.000Z

50

MFTF 230 kV pulsed power substation  

SciTech Connect

The Mirror Fusion Test Facility (MFTF) currently under construction at the Lawrence Livermore Laboratory includes a Sustaining Neutral Beam Power Supply System (SNBPSS) consisting of 24 power-supply sets. The System will operate in long pulses (initially .5 seconds and eventually 30 seconds) at high power (200 MW), which will necessitate a large source of ac power. To meet this requirement, a new 230-kV substation is also being built at LLL. The constraints of cost, equipment protection, short operating lifetime (10 years), and reliability dictated a unique substation design. Its unusual features include provisions for fast fault detection and tripping, a capability for limiting ground fault current, low impedance, and economical design.

Wilson, J.H.

1979-11-12T23:59:59.000Z

51

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high volt­age GaAs pho­to­guns have been built at Jef­fer­son Lab based on a com­pact in­vert­ed in­su­la­tor de­sign. One pho­to­gun pro­vides the po­lar­ized elec­tron beam at CEBAF and op­er­ates at 130 kV bias volt­age. The other gun is used for high av­er­age cur­rent life­time stud­ies at a ded­i­cat­ed test fa­cil­i­ty and has been op­er­at­ed at bias volt­age up to 225 kV. The ad­van­tages of high­er DC volt­age for CEBAF in­clude re­duced space-charge emit­tance growth and the po­ten­tial for pro­longed pho­to­cath­ode life­time. How­ev­er, a con­se­quence of op­er­at­ing at high­er volt­ages is the in­creased like­li­hood of field emis­sion or break­down, both of which are un­ac­cept­able. High­lights of the R&D stud­ies lead­ing to­ward a pro­duc­tion 200keV GaAs pho­to­gun for CEBAF will be pre­sent­ed.

Grames, J M; Clark, J; Hansknecht, J; Poelker, M; Stutzman, M L; Suleiman, R; Surles-Law, K.E.L.; BastaniNejad, M

2011-03-01T23:59:59.000Z

52

Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect

The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

1994-10-01T23:59:59.000Z

53

Proposed 230-kV Crossover Substation, Big Horn County, Montana: Environmental assessment  

SciTech Connect

Western proposes to construct, operate, and maintain a 230-kV substation northwest of Hardin, Big Horn County, Montana. The proposed Crossover Substation would form an interconnection between Western's Yellowtail-Custer and MPC's Colstrip-Billings 230-kV transmission lines. Impacts and mitigation strategies are discussed.

1984-02-01T23:59:59.000Z

54

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

55

Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment  

Science Conference Proceedings (OSTI)

Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.

Not Available

1993-02-05T23:59:59.000Z

56

HVDC converter stations for voltages above 600 kV: R and D needs and priorities: Final report  

Science Conference Proceedings (OSTI)

A study of the R and D needed to build converter stations for HVDC transmission lines with pole-to-ground voltages between 800 and 1200 kV confirmed that economical designs for more than 800 kV will require long-term R and D. Converter stations for 800 kV appear possible with existing technology.

Krishnayya, P.C.S.; Maruvada, P.S.; Lambeth, P.J.; Desilets, G.; Trinh, N.G.

1986-12-01T23:59:59.000Z

57

Evaluation of 765-kV Polymer Insulators in a Contaminated Environment  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) and the Korea Electric Power Research Institute (KEPRI) are conducting a joint study on the aging performance of 765-kV polymer insulators in a contaminated marine environment. The main component of this research is a long-term (two-year) natural aging test that will be conducted by KEPRI at their 765-kV Gochang test facility in South Korea. EPRI has engaged three other utilities that operate 765-kV transmission systemsEskom in South Africa, American Electric ...

2010-04-30T23:59:59.000Z

58

Wood substation design beats out steel. [Conversion of 115-kV to 230 kV substations at Carolina Power and Light Co  

SciTech Connect

Construction plans for voltage conversion of substations can lead to new designs that are economical, reduce outage times, and result in minimum impacts on the environment. In fact, these factors prompted Carolina Power and Light Co. to make one such design its construction standard. Cost of converting a 115-kV distribution source substation to 230 kV is 20 percent less than that of replacing it with one of steel design. And because the conversion creates negligible environmental impact, getting government approval for the project is not a major problem. Steel is relegated to special situations.

Thompson, C.M.

1976-09-15T23:59:59.000Z

59

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

60

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Plans for 735 kV substation. Towers revealed: Manicouagan-Outardes system  

SciTech Connect

A review of papers presented at the Toronto IEEE meeting is presented. Details of the substation design for the Manicouagan-Outardes 735 kV system are given.

Archambeau, J.; Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-07-15T23:59:59.000Z

62

Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation  

Science Conference Proceedings (OSTI)

The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

Ohler, C.K.

1991-05-21T23:59:59.000Z

63

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

64

Glossary - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Kilovolt-Ampere (kVa): A unit of apparent power, equal to 1,000 volt-amperes; the mathematical product of the volts and amperes in an electrical circuit.

65

Microsoft Word - CX-Alvey 500 kV Fencing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Hamid Habibi Project Manager - TESF-CSB Proposed Action: Replace existing posts and fencing around Alvey Substation 500-kV switch yard. PP&A Project No.: 1 632 Budget Information: Work Order: 00250208 Task: 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.11 Installation of fencing, including that for border marking that will not adversely affect wildlife movements or surface water flow. Location: The proposed project is located in Lane County, Oregon at the Bonneville Power Administration (BPA) Alvey substation around the 500-kV switch yard. Proposed by: BPA Description of the Proposed Action: The project involves replacement of the existing fence and fence posts for the 500-kV yard at the

66

220 kV SSSC device for power flow control (Smart Grid Project) | Open  

Open Energy Info (EERE)

kV SSSC device for power flow control (Smart Grid Project) kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location Catalonia, Spain Coordinates 41.59116°, 1.520862° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.59116,"lon":1.520862,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

67

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison  

SciTech Connect

Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

Kelley, Nathan; Corsaro, Pietro

2004-12-01T23:59:59.000Z

68

Hydro Quebec's 735 kV system in operation by 1965  

SciTech Connect

The 735-kV transmission system adopted for the Manicouagan-Outardes development consists of three 735-kV lines, two of which will cross the St. Lawrence River at Quebec City and follow its south shore to Montreal. The third circuit will be entirely on the north shore of the St. Lawrence. Six 735-kV substations will be required: two collector substations at the sending end, two intermediate substations in the Quebec City area and two receiving substations in the Montreal area. Some of the problems associated with the planning and design of a transmission system intended to deliver approximately 5000 MW over a distance of 360 miles are discussed. The aspects of transmission and substation planning, transmission line features, substation design, control and communications design are considered.

Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-01-01T23:59:59.000Z

69

0.4 kV remote control (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

4 kV remote control (Smart Grid Project) 4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

70

TVA's 500-kV electric and magnetic fields: measurements and analyses  

Science Conference Proceedings (OSTI)

This report summarizes the results of the 500-kV electric and magnetic fields data project, performed by the Electrical Systems Group of the Tennessee Valley Authority (TVA). The objectives of the project were to measure, record, and analyze electric and magnetic fields in the vicintiy of TVA's 500-kV transmission lines. Also the effects of transmission line fields on the growth and development of selected agricultural and forest plant species were to be investigated. This report contains only the categorization and the statistical analysis of the fields data.

Not Available

1983-09-01T23:59:59.000Z

71

Insulation and radio influence dictate design of 650 kV substation  

SciTech Connect

The 650 kV North Substation of Project EHV is marked by three unusual features which differentiate it from the more familiar 230 and 345 kV substations. First, the sheer size of the apparatus, structures, and busses is striking. Second, is the amount of insulation. As represented by insulators and bushings it is proportionally much larger in lower voltage substations. Third, is the absence of sharp protrusions or angles anywhere in the substation, even on the roof of the house where corona loss is measured. Shielding is evident everywhere in the circles or ovals of smooth aluminum tubing.

Abetti, P.A.

1961-03-27T23:59:59.000Z

72

Present and future applications for 34. 5-kV vacuum switchgear  

SciTech Connect

Vacuum technology applied to circuit breakers for 34.5-kV metal-clad switchgear offers significant advantages over equipment of previous design. Substation size, a major consideration to the 34.5-kV distribution system designer, is further reduced when vacuum equipment is specified. Vacuum equipment versatility is evidenced by the growing number of substation circuit configurations being implemented. Improved interruption capabilities, longer life and reduced maintenance are features offered by vacuum. These many features assure vacuum equipment a prominent position in future substation designs in this voltage class.

Sullivan, P.

1975-01-01T23:59:59.000Z

73

Defective insulators in live working on a 550kV compact steel lattice tower  

Science Conference Proceedings (OSTI)

Research was conducted to determine the minimum number of healthy insulator units needed to ensure worker safety in live working on a compact 550 kV steel lattice tower. A large variety of worksite conditions was investigated. Test results confirm the conservative nature of the CIGRE formula for defective insulator units, and modifications to the formula are suggested. The recommended number of healthy units is 12 in a string of 24 units for the case of live work on the compact 550 kV tower, when the Portable Protective Gap (PPG) is used. Adjustment for altitude should be made above 900 m (3,000 ft).

Gela, G. [EPRI Power Delivery Center, Lenox, MA (United States); Kientz, H. [Western Area Power Administration, Golden, CO (United States); Fox, H.J. Jr. [Public Service Electric and Gas, Bridgewater, NJ (United States); Mitchell, J.D. [Alabama Power Co., Birmingham, AL (United States); Lyons, P.F. [EPRI, Haslet, TX (United States)

1997-04-01T23:59:59.000Z

74

The 4 times 6 network; Upgrade of a major 500kV substation  

SciTech Connect

This paper describes a study to enhance the reliability of BC Hydro's Ingledow 500 kV substation. It employs truth tables and frequency and duration analysis. The study included double-breaker double-bus and 4 {times} 6 arrangements, and 4 {times} 6 was recommended for its cost and reliability advantages.

Page, R.; Nishikawara, K.; Stromotich, F. (Substation Planning Associates, Inc., West Vancouver (CA))

1991-04-01T23:59:59.000Z

75

Special design and testing aspects of the 345 kV East Fishkill substation  

SciTech Connect

The installation of two 135 MVAR capacitor banks in the 345 kV East Fishkill substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. This paper describes the design of the substation and the tests performed before commissioning the capacitor banks.

Fogarty, R.P.; Halleran, T.M.; Laskowski, L.M.; Mark, D.A. (Consolidated Edison Co. of New York, Inc., New York, NY (United States))

1992-10-01T23:59:59.000Z

76

BLID sensor evaluation at a 500-kV substation: an interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of a buried-line intrusion detection (BLID) sensor is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensor are described.

1979-05-01T23:59:59.000Z

77

Perimeter sensor evaluation at a 500-kV substation. Interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of exterior perimeter intrusion sensors is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensors are described.

Griffith, R.D.

1978-08-01T23:59:59.000Z

78

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Impact Statement: Public Comment Period Ends 09/25/13This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

79

Design and Overview of 100 kV Bushing for the DNB Injector of ITER  

Science Conference Proceedings (OSTI)

The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

2011-09-26T23:59:59.000Z

80

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Solid-State Fault Current Limiter Development: Design of a 15.5-kV Field-Ready Unit  

Science Conference Proceedings (OSTI)

The solid-state current limiter (SSCL) is power-electronics-based equipment designed to work with the present utility system. The SSCL monitors the line current and dynamically inserts additional impedance into the line if a fault is detected. The SSCL is based on a modular design and can be configured for 5-kV through 69-kV systems at nominal current ratings of 1000A–4000A.In this report, a complete design is presented for 15.5-kV, 1200A and 4000A, single-phase and three-phase ...

2013-02-14T23:59:59.000Z

82

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable line stations) Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

83

KvH Projekt GmbH Co KG | Open Energy Information  

Open Energy Info (EERE)

KvH Projekt GmbH Co KG KvH Projekt GmbH Co KG Jump to: navigation, search Name KvH Projekt GmbH & Co KG Place Hamburg, Germany Zip D-20259 Sector Biomass, Solar, Wind energy Product Project developer in wind, solar, biomass and smart architecture. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

84

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington http:energy.govnepadownloadseis-0422-epa-notice-availability-draft-environmenta...

85

Microsoft Word - FY13TYSP- KCP Document w comments incorporated...  

National Nuclear Security Administration (NNSA)

- Kirtland Operations KV - kilovolt LAC - Lightning Arrestor Connector LANL - Los Alamos National Laboratory LEED - Leadership in Energy and Environmental Design LEP - Life...

86

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Energy.gov (U.S. Department of Energy (DOE))

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

87

Microsoft Word - SWPAIceStormDamage_021109.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

of 69-kilovolt (kV) line running from North Arkansas Electric Cooperative's Viola Substation near Salem, Arkansas, to Sho-Me Power Electric Cooperative's China Substation near...

88

Transmission Line Jobs and Economic Development Impact (JEDI...  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Model Kcmil Thousand Circular Mils kV kilovolts MW Megawatt NESC National Electrical Safety Code NREL National Renewable Energy Laboratory O&M Operations and Maintenance...

89

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

90

Analysis of a 1200 kV circuit breaker for a gas insulated substation. Final report  

Science Conference Proceedings (OSTI)

This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.

Not Available

1985-01-01T23:59:59.000Z

91

Scale model simulates full-size substation electric fields. [For 345-kV system  

SciTech Connect

An innovative scale model of a 345-kV substation that can be energized to produce representative electric fields has been developed. The purpose of the model is to determine how changes in substation design and operation affect ground-level voltage gradients. Recent tests of the field strengths predicted by the model and actual voltage gradients at the full-size substation at 150 different pairs of points showed excellent agreement. For 94 percent of the pairs the model error was less than 10 percent. The statistical mean of the absolute values of the discrepancies for all 150 points was only 4.6 percent.

1977-04-01T23:59:59.000Z

92

Development of 77 kV 40 MVA gas-vapor cooled transformer  

SciTech Connect

A 77 KV 40 MVA gas-vapor cooled transformer has been developed as a prototype of substation transformers, which is directed to nonflammable and lightweight properties. To examine the operating reliability of the transformer, the reliability test has continued since July, 1981 at the Hokusetsu substation of KEPCO (Kansai Electric Power Co., Inc.). This report will cover the development work on thermal stability of materials, electrical fault test, insulation characteristics, cooling of model transformer, flow-induced static electrifiction, protection system and the prototype unit which is being built based upon these developments.

Tokoro, K.; Harumoto, Y.; Ina, T.; Kabayama, Y.; Sato, T.; Yamauchi, A.

1982-11-01T23:59:59.000Z

93

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

1991-06-01T23:59:59.000Z

94

EPRI Transmission Line Reference Book (Blue Book): 115-345 kV Compact Line Design  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the Blue Book, which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines. Note that this electronic report is being pu...

2007-12-13T23:59:59.000Z

95

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Draft environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (ac) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. These adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

96

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Final environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (AC) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. The adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

97

Single-transformer substation for 500 kV and over  

SciTech Connect

At extra high voltage substations which must meet high reliability requirements, in particular, two autotransformer groups are often installed almost simultaneously independent of the load. As a result, significant capital investment is frozen for long periods, and scarce electrical equipment is utilized inefficiently. Thus, in a number of cases the construction of substations with a single group of single-phase autotransformers is desirable. In this case, on failure of one autotransformer phase the time of subnormal energy output due to disconnection of the substation may reach several hours. The efficiency of extra high voltage substations may be improved significantly by using a proposed circuit for connection of a group of single-phase transformers with a single reserve phase, permitting installation of one group of single-phase transformers at a substation without impairment of reliability. The installation, performance and cost of this transformer arrangement are discussed. It is concluded that the use of single-transformer 500 kV substations with the proposed circuit as distribution substations would, on the one hand, provide sufficient reliability for users and, on the other hand, would make them competitive with 220 to 330 kV substations. In this case the network reliability can be provided by sectionalizing the lines at the site of transformer connection. This circuit can be used with two-sided substation supply. (LCL)

Gryuntal, Yu.L.; Mikhailov, A.K.; Slavin, G.A.

1978-06-01T23:59:59.000Z

98

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

99

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

100

Categorical Exclusion Determinations: New Jersey | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9,...

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash.,...

102

Proposal to negotiate, without competitive tendering, a contract for the maintenance of three 420 kV circuit breakers  

E-Print Network (OSTI)

This document concerns the award of a contract for the maintenance, by the manufacturer, of three 420 kV circuit breakers. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, with SCHNEIDER ITALY (IT) (formerly NUOVA MAGRINI GALILEO), the manufacturer of the equipment, for the maintenance of three 420 kV circuit breakers for a total amount of 490 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT?100%.

2000-01-01T23:59:59.000Z

103

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

104

A frequency domain model for 3 kV dc traction dc-side resonance identification  

SciTech Connect

Frequency-dependent effects in railway traction power systems arise from the impedance of substation and locomotive line filters and the traction line. Harmonic noise from traction drives and substations can excite resonances and produce overcurrent or overvoltage conditions at critical points in the network. In this paper, the harmonic feeding impedances of a 3 kV DC traction system seen from the rectifier substation, locomotive drive converter and pantograph terminals are presented. Several substation and locomotive filters are considered with a frequency-dependent traction line. Resonances attributed to the substation filter, locomotive filter and traction line are separate and distinct, the line introducing poles and zeros in the audio frequency (AF) range which vary in frequency and magnitude with locomotive position.

Hill, R.J. [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering; Fracchia, M.; Pozzobon, P.; Sciutto, G. [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica

1995-08-01T23:59:59.000Z

105

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

106

Lightning overvoltage protection of the paddock 362-145 kV Gas-Insulated Substation  

SciTech Connect

Backflashovers close to the Paddiock 362-145 kV Gas-Insulated Substation (GIS) have been analyzed with the Electro-Magnetic Transient Program (EMTP) using a frequency dependent multi-conductor system. The severity of the lightning stroke currents were derived based on recent recordings in the eastern United States. Impacts of corona attenuation and distortion were accounted for using a shunt linear model approach. Turn-up effects of both line insulator flashover voltages and surge arrester protective characteristics were represented based on manufacturer's volt-time curves. Wave shaping effects of substation capacitances (ie., PT's transformers, CCPD's) were also modeled. Results show the importance of various modeling details in determining the overvoltages inside the GIS due to close backflashovers, which are caused by lightning strokes with varying intensity. These results are aimed at better evaluation of lightning protection requirements for GIS protected by metal-oxide surge arresters.

Elahi, H.; Sublich, M. (GE Industry and Utility Sales, Schenectady, NY (US)); Anderson, M.E.; Nelson, B.D. (Wisconsin Power and Light Co., Madison, WI (USA))

1990-01-01T23:59:59.000Z

107

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

Science Conference Proceedings (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

108

Comparison of prediction and measurement of negative sequence currents of generators connected to 345-kV asymmetrical transmission lines  

Science Conference Proceedings (OSTI)

This paper is used to evaluate the negative sequence currents (NSC) of two generators in a generation plant, which are connected to the power pool through four over-head asymmetrical 345-kV transmission lines. The simulation results by using PSS/E and ... Keywords: EMTP, PSS/E, asymmetrical transmission lines, negative sequence current, unbalance

Chi-Jui Wu; Ping-Heng Ho

2011-03-01T23:59:59.000Z

109

Study on Tubular Busbar Corona Design Optimization of ±660kV HVDC Converter Substation in Qingdao  

Science Conference Proceedings (OSTI)

The HVDC busbar corona characteristic is the main factor taken into account for choosing busbar of HVDC converter substation. By establishing the calculation models of electric field strength along the busbar surface, ground total electric field strength ... Keywords: ±660 kV HVDC, converter substation, corona characteristics, electromagnetic, tubular busbar optimization

Xu Mingming; Li Kejun; Tan Zhenyu; Niu Lin

2010-06-01T23:59:59.000Z

110

EA-0962: Construction and Routine Operation of a 12-kilovolt...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

source to the WKWD Station A, which will significantly reduce NPR-1's overall utility costs. NPR-1 is known as Elk Hills oil field and is located in the southern San Joaquin...

111

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

112

Environmental assessment: Coolidge-Saguaro 115-kV rehabilitation, Pinal County, Arizona  

Science Conference Proceedings (OSTI)

This Environmental Assessment (EA) presents an analysis of the environmental impacts of the proposed rehabilitation of 29.6 miles of the Coolidge-Saguaro 115-kV transmission line. The project area is in Pinal County, Arizona. The proposal involves reconductoring the line with larger conductor, replacement of deteriorated structures, and replacement of damaged insulators. The proposed action is being considered in order to increase the safety and reliability of this line. The alternative of no action is also addressed in this EA. The proposed action would have insignificant impacts on wildlife, vegetation or other natural resources. There would be no impacts on floodplains or wetlands. The major impact would be on agricultural crops but much of this can be minimized by the timing of construction. There are no conflicts with county or local planning projects. No cultural resources will be affected by the proposed action. The no action alternative would not correct the potential safety hazard or reliability problems of the existing line.

Not Available

1982-09-01T23:59:59.000Z

113

Performance characteristics of the Atlas 60 kV, 60 kJ plastic capacitors  

DOE Green Energy (OSTI)

This paper provides the performance data of Atlas plastic capacitors as supplied by Maxwell Technologies and Aerovox Corporation. The fiberglass cases at 13 inches high by 29 inches wide and 28 inches in depth with a 2 inch by 18 inch bushing on each end. Two styles of the 33.5uF capacitors have been evaluated for Atlas use, a conventional paper-foil and a self-healing metalized-paper and plastic dielectric design. A test program to capacitor failure, is being used to evaluate capacitor lifetime at full voltage (60 kV) and a nominal 15% reversal. With the Atlas parameters, peak currents of {approximately} 340 kA are realized. In anticipation of faults, capacitors are capable, specified, and tested for 700 kA performance. Accurate methods are also utilized to determine capacitor inductance, less than 20 nH. The results of the various capacitor testing programs will be presented in addition to future directives for their R and D efforts.

Reass, W.; Bennet, G.; Bowman, D.; Lopez, E.; Monroe, M.; Parsons, W.

1997-12-01T23:59:59.000Z

114

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

115

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

116

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

117

EIS-0399: Final EIS for the Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line Comments/Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line VOLUME 2 COMMENT RESPONSE DOCUMENT September 2008 United States Department of Energy State of Montana Department of Environmental Quality COVER SHEET Responsible Agencies: U.S. Department of Energy (DOE) and Montana Department of Environmental Quality (DEQ) are co-lead agencies; the Bureau of Land Management (BLM), U.S. Department of the Interior, is a cooperating agency. Title: Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399) Location: Cascade, Teton, Chouteau, Pondera, Toole, and Glacier counties, Montana. Contacts: For further information about this Final EIS, contact: Ellen Russell, Project Manager,

118

Best Practices for HPFF Pipe Type Cable Assessment, Maintenance and Testing: Blenheim-Gilboa 345-kV Cable Systems  

Science Conference Proceedings (OSTI)

EPRI and the New York Power Authority (NYPA) have sponsored an extensive series of tests on the NYPA Blenheim-Gilboa 345-kV high-pressure fluid-filled (HPFF) transmission cable systems to determine their condition. Several tests were also designed to determine cable power transfer capability based on distributed temperature measurements and to improve the best maintenance practices for the Blenheim-Gilboa HPFF cable systems.

2005-03-01T23:59:59.000Z

119

Investigation of Geomagnetically Induced Currents in the Proposed Winnipeg-Duluth-Twin Cities 500-kV Transmission Line  

Science Conference Proceedings (OSTI)

The effects of geomagnetically induced currents (GIC) on a new 749-km, 500-kV ac transmission line were investigated. GIC effects on the operation of the line, equipment connected directly to the line, and power systems connected to the line were considered. The study concluded that GIC can have a substantial impact on equipment performance and on the power system. Potentially troublesome equipment and system conditions (both steady-state and transient) were identified.

1981-07-01T23:59:59.000Z

120

Field Demonstration of a 24-KV Warm Dielectric Cable at Detroit Edison: FY2001 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the U.S. Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high-temperature superconducting (HTS) power cable in a Detroit Edison substation to serve customer load. The scope of this demonstration will result in the world's first underground installation of an HTS cable system using an existing duct network. Furthermore, the project involves installing the necess...

2002-02-12T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EPRI Transmission Line Reference Book: 115-345 kV Compact Line Design, The Blue Book  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines.

2008-11-05T23:59:59.000Z

122

Roseville Direct Service 230 kV Transmission Line Project, Sacramento and Placer Counties, California: Environmental assessment  

SciTech Connect

At present, the only transmission line serving the City of Roseville is operated by Pacific Gas and Electric Company (PG and E), which serves the City's Berry Street substation with a 60-kV circuit from the company's own Atlantic Street substation. Western pays wheeling charges to PG and E for use of their lines to deliver power to its customers which cannot be served directly. PG and E has informed Roseville that additional system facilities are required to meet the City's firm transmission requirements in excess of 69 megawatt peak. They proposed to build a new 230-kV line and transformer bank at a cost of $10.9 million which the City would have to pay, in addition to the wheeling charges Western would be charged to use the PG and E line. The City's preferred alternative is to have Western construct a direct 239-kV service from its Elverta substation to the Berry Street substation. This would save the city money in construction capital cost, result in more transmission capacity and eliminate the present wheeling costs charged to Western. Mitigation recommendations are included.

1986-06-01T23:59:59.000Z

123

High-Pressure Fluid-Filled Cable Condition Assessment Through Electrical Impulse Testing of PSE&G 230-kV Service-Aged Cable  

Science Conference Proceedings (OSTI)

This report describes electrical and mechanical testing of a service-aged 230-kV high-pressure fluid-filled (HPFF) cable sample that was removed from a Public Service Electric & Gas (PSE&G) underground transmission line.

2008-11-26T23:59:59.000Z

124

STUDY OF ACCELERATED AGING OF 15 kV XLPE AND EPR CABLE INSULATION BY SWITCHING IMPULSES AND ELEVATED AC VOLTAGE.  

E-Print Network (OSTI)

?? Accelerated aging of 15 kV Cross-linked Polyethylene (XLPE) and Ethylene Propylene Rubber (EPR) power cables was carried out in the experiments set for the… (more)

Cao, Linfeng

2010-01-01T23:59:59.000Z

125

Characteristics of Gafchromic XRQA2 films for kV image dose measurement  

SciTech Connect

Purpose: In this study, the relevant characteristics of the new Gafchromic XRQA2 film for its application in measuring kV cone beam computed tomography (CBCT) image doses were thoroughly investigated. Methods: The film was calibrated free in air to air kerma levels between 0 and 9 cGy using 120 kVp photon beams produced by the x-ray volume imager. Films were scanned using transmission and reflection scanning modes with the Epson Expression 10000 XL flat-bed document scanner. The impact of film size, region of interest for the analysis, scan uniformity, scan resolution, scan orientation and alternate scanning sides on the analysis process were investigated. Energy dependence, postirradiation growth of reflectance with time and irradiation angular dependence of the film were tested at different air kerma levels. Results: The net reflectance changed by {approx}3% when the size of the film piece changed from 1 cm x 2 cm to 10 cm x 11 cm and changed by {approx}1% when ROI changed from 0. 7 cm x 0. 7 cm to 8 cm x 8 cm, suggesting a good uniformity of the film. The film was successfully analyzed using the transmission scanning mode, calibration curves from both transmission and reflection scanning modes showed similar behavior. The calibration uncertainty was somewhat lower when the film was scanned using reflection mode (6% and 8% for reflection and transmission modes, respectively.) Higher scanning resolution came with increasing calibration uncertainty. The calibration uncertainty for reflection and transmission modes increased from {approx}3.5% to 7% and from {approx}3.5% to 9%, respectively when scanning resolution was changed from 50 to 400 dpi. Scanning the film on alternate sides using transmission mode led to variation of 16%-19% in the net optical density at doses commonly used for CBCT procedures. The film response changed by almost 10% when it was exposed to beams of two different energies (100 and 120 kVp.) Other features of the film such as film orientation, postexposure growth, and irradiation angular dependence were also investigated. Conclusions: The size of film piece and analysis ROI used for calibration slightly affected the film response. Both transmission and reflection scanning modes can be used to analyze the Gafchromic XRQA2, with the reflection mode having a somewhat lower calibration uncertainty. Scanning films on alternate sides using transmission mode significantly affects the optical density. The film response was shown to be energy dependent. The films reached stability in about 6 h after exposure. The film response was proven to be independent of irradiation angle except when the beam is parallel to the film surface.

Giaddui, Tawfik; Cui Yunfeng; Galvin, James; Chen Wenzhou; Yu Yan; Xiao Ying [Department Of Radiation Oncology, Thomas Jefferson University, Philadelphia, Pennsylvania 19107 (United States)

2012-02-15T23:59:59.000Z

126

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

127

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

Science Conference Proceedings (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

Gusev, S. I. [JSC 'FSK EES' (Russian Federation); Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I. [Scientific-Research Institute of Electric Power Engineering (VNIIE) - Branch of the JSC 'NTTs Elektroenergetiki', (Russian Federation)

2009-09-15T23:59:59.000Z

128

Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack  

Science Conference Proceedings (OSTI)

ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

Dr. Ram Adapa; Mr. Dante Piccone

2012-04-30T23:59:59.000Z

129

Field Demonstration of a 24-kV Warm Dielectric Superconducting Cable at Detroit Edison: FY2003 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV HTS power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The FY2002 status report focused on leak detection. The cornerstone of...

2004-03-30T23:59:59.000Z

130

Strategy for Updating EPRI's Transmission Line Reference Book: 115-138-kV Compact Line Design ("The Blue Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a new, updated edition of the Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was originally published in 1978. The new edition will provide the most up-to-date technical information and practices on the design and maintenance of compact overhead lines. It will enable energy companies to construct cost-effective compact lines that produce optimal performances and to address the ability to maintain compact lines w...

2006-10-30T23:59:59.000Z

131

Review and evaluation of the Department of Energy's Research and Development Program for 1200-kV transmission and substation equipment  

SciTech Connect

In 1975 the US Department of Energy (DOE), Division of Electric Energy Systems (EES), initiated a program for the research and development (R and D) of 1200-kV transmission and substation equipment with a goal of developing the technology capable of three-phase power transfer of 10 GW. The program was oriented toward compact, compressed-gas-insulated (CGI) component design. The DOE/EES R and D program has encompassed all the major and essential transmission cable, substation apparatus, and specialized instrumentation for a 1200-kV system. It has included more than ten major multiyear research projects and has involved numerous research, development, manufacturing, and testing organizations. This report provides a review and evaluation of the overall DOE/EES 1200-kV R and D program. It includes detailed descriptions of the major projects, their objectives, component and system design direction, and current research status. Future R and D requirements are noted, and commercialization issues are briefly discussed. Research to date has not presented any insurmountable technical obstacles to 1200-kV CGI component design. Thus, although all of the component pieces are not yet available and all of the testing is not yet complete, 1200-kV CGI-based transmission and substation equipment appears to be technically feasible. Although the substation and transmission components under development in this program will not likely reach 1200-kV system commercialization for a number of years, many of the materials and design concepts that have been identified for 1200-kV service are readily applicable to devices rated at lower voltages.

Gnadt, P.A.; Walldorf, S.P.

1985-06-01T23:59:59.000Z

132

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

133

Lightning protection requirements of SF/sub 6/ substation determined by hybrid simulator. [115/345 kv station  

SciTech Connect

The development of a hybrid computer simulation which can provide the type and quantity of data necessary for determining the behavior of lightning-caused surges traveling through substations is discussed. Results from a specific application on a 115-kV/345-kV station are presented. The results show that the simulation of SF/sub 6/ substations during lightning-caused surges is ideally accomplished by hybrid computer. The quantity of data for complete substation analysis may be gathered efficiently. In addition, digital graphical summaries provide quick insight into substation behavior. The application of this method to simple configurations has shown the previous assumptions must be carefully reviewed. For example, it is shown by computer simulation and analytical hand calculation that the surges with the steepest wave fronts may not produce the highest substation voltages. It is concluded that this hybrid simulation is an excellent tool in the determination of SF/sub 6/ substation response to lightning-caused surges. (LCL)

Tranen, J.D. (New England Electric System, Westborough, MA); Hedin, R.A.; Minnick, J.J.; Priest, K.W.

1977-01-01T23:59:59.000Z

134

Development of 1200-kV compressed-gas-insulated transmission and substation equipment in the United States  

SciTech Connect

Major research and development (R and D) programs for the development of sulfur hexafluoride (SF/sub 6/) compressed-gas-insulated (CGI) equipment for ultrahighvoltage (uhv) application at 100-1200 kV have been under way independently in both the United States and Japan. The CGI transmission and substation equipment under study and development in these countries has included the surge arrester, circuit breaker, CGI transmission bus, disconnect and ground switches, and an air-SF/sub 6/ termination. The US CGI program has also included development of a power transformer, shunt reactor, voltage- and current-sensing instrumentation, and a line trap, all for 1200-kV application. This paper presents the overall status of development of CGI substation equipment for uhv application in the United States. It describes the major CGI components developed, highlights their key design aspects, indicates the present status of development and testing, and addresses the work remaining to establish final design consepts. The paper also includes 23 references, a number of which have not been widely distributed or included in any of the recently published bibliographies of uhv substation equipment.

Walldorf, S.P.; Gnadt, P.A.

1986-01-01T23:59:59.000Z

135

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

136

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

DOE Green Energy (OSTI)

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

137

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

138

Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks  

SciTech Connect

An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S. [Electric Power Research Institute (VNIIE) (Russian Federation)

2006-11-15T23:59:59.000Z

139

Review for the State of the Art and Application of Polymer Materials / Insulation used in Distribution Class (12 - 46 kV class) Substations  

Science Conference Proceedings (OSTI)

This report covers the results of a state-of-art study into distribution class (12-46 kV) polymer-based products, the technology used to manufacture them, utility experiences, field potential inspection and diagnostic technique, and utility interest for future research and development to be conducted by EPRI.

2003-11-24T23:59:59.000Z

140

Longitudinal Load and Cascading Failure Risk Assessment (CASE): Central Louisiana Electric Cooperative's 500-kV Toledo-Coushatta Transmission Line  

Science Conference Proceedings (OSTI)

EPRI's Cascading Failure Risk Assessment (CASE) methodology was used to determine extreme event, unbalanced loads on Central Louisiana Electric Company's (CLECO) 500-kV, single circuit, Toledo-Coushatta transmission line. The methodology also identified the line's cascading potential under different loading conditions.

1998-03-11T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

CX-010427: Categorical Exclusion Determination | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

which is located within PacifiCorp's McNary-Wallula 230-kilovolt (kV) transmission line right-of-way (ROW). CX-010427.pdf More Documents & Publications CX-010425: Categorical...

142

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 02 to 13, 32, 81, 86, 96 to 97, 122 to 142, 155,...

143

Microsoft Word - SWPAIceStormDamage_032409.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

was energized at 9:46 a.m. on Tuesday, March 24, 2009. The 37.2-mile, 161-kilovolt (kV) transmission line from Kennett, Missouri, to New Madrid, Missouri, was fully restored by...

144

CX-010430: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration

145

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06142013 Location(s): Oregon...

146

CX-010686: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

147

EIS-0496: San Luis Transmission Project, Alameda, Merced, San...  

NLE Websites -- All DOE Office Websites (Extended Search)

proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and...

148

Browse wiki | Open Energy Information  

Open Energy Info (EERE)

to industrial customers that are served directly from a 6912.47 kilovolt (kV) substation and have monthly Maximum Measured Demands in excess of 2,000 kilowatts (kW) per...

149

Data:66aba637-611c-47dc-8b32-965bbbb8b605 | Open Energy Information  

Open Energy Info (EERE)

to industrial customers that are served directly from a 6912.47 kilovolt (kV) substation and have monthly Maximum Measured Demands in excess of 2,000 kilowatts (kW) per...

150

Data:A192f878-f146-47dd-92cf-46d4a0019e06 | Open Energy Information  

Open Energy Info (EERE)

to industrial customers that are served directly from a 6912.47 kilovolt (kV) substation and have monthly Maximum Measured Demands in excess of 2,000 kilowatts (kW) per...

151

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

An existing 13.8KV480V, 1000 kVA pad mounted transformer located on the southeast side of 105-R near the reactor ventilation stack must be relocated prior to stack demolition. The...

152

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

As a result of lightning, the 2500 kVA 13.8kV480V transformer that normally supplies power to the switchgear was damaged. The transformer repair replacement is a lengthy process...

153

U.S. Department of Energy Categorical Exclusion ...  

NLE Websites -- All DOE Office Websites (Extended Search)

the Portable Crew Shacks located in the H-Tank Farm area. Provides design for a new transformer bank consisting of (3) three - 13.8kV-208Y120, 1-Phase, 50 kVA pole mounted...

154

Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.  

SciTech Connect

Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

Lee, Jack M.

1992-06-01T23:59:59.000Z

155

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

156

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

157

Evaluation of Suspected Steady-State Magnetic Induction by a 345-kV Double-Circuit Transmission Line onto Railroad Track  

Science Conference Proceedings (OSTI)

CenterPoint Energy operates a double circuit 345-kV transmission line north of Houston that parallels the Burlington Northern Santa Fe Railroad (BNSF) for approximately 15 miles. The railroad is experiencing elevated steady-state 60-Hz voltage in the parallel exposure. AC voltages and currents in railroad track can come from many sources. And, railroad systems can withstand reasonable amounts of this electromagnetic interference (EMI) without problems. When problems with EMI on a railroad do appear, it i...

2008-11-12T23:59:59.000Z

158

Bipolar HVDC Transmission System Study Between (+ or -) 600 kV and (+ or -) 1200 kV--Corona Studies, Phase II  

Science Conference Proceedings (OSTI)

This report documents a study of the corona performance characteristics of a 6 x 4.06 cm conductor bundle tested under all possible weather conditions and at voltages ranging from plus/minus 750 to plus/minus 1050 kV. Radio interference, audible noise, and corona loss performance were evaluated, and the influence of line voltage on these parameters was studied. Data were collected on the lateral profiles of radio interference, audible noise, ion current density, and electric field at ground level. Electr...

1982-12-01T23:59:59.000Z

159

Failure Analysis of a 345 kV High-Pressure, Fluid-Filled Cable Insulated with Laminated Paper Polypropylene at New York Power Author ity  

Science Conference Proceedings (OSTI)

Three cable pieces of a 345-kV high-pressure, fluid-filled, laminated paper151polypropylene (LPP) cable, each nearly 3 ft in length, were received from New York Power Authority in January 2010. The Detroit Edison Company performed the dissection and analysis to address the cause(s) of the failure that occurred in late December 2009 and that was experienced by this 10.1 circuit-mile cable that had been energized in service in May 1991. One of the pieces contained the failure, and the other two were adjace...

2011-02-28T23:59:59.000Z

160

Eight percent cost penalty for world's first 765-kV SF/sub 6/ substation may be bargain  

SciTech Connect

A Lynchburg, Virginia 765 kV sulfur hexafluoride substation cost a premium of 8% over conventional substations in order to meet environmental requirements, but the first 18 months of operation required no maintenance costs and a design flexibility that meant less land and no landscaping was required. Some of the added front-end cost should be assigned to research and development for this prototype installation. A review of the siting and design specifications cites a number of environmental as well as economic advantages of low-profile, gas-insulated substations. 7 figures, 1 table. (DCK)

Laskowski, L.M.

1981-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage  

SciTech Connect

The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

2011-08-25T23:59:59.000Z

162

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

163

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

164

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Click to edit Master title style 15 kV Phase Leg Power Modules with SiC MIDSJT Devices Ranbir Singh and Siddarth Sundaresan GeneSiC Semiconductor Inc. ranbir.singh@genesicsemi.com +1 703 996 8200 43670 Trade Center Pl #155; Dulles VA 20166 September 27, 2012 Acknowledgement: The authors thank Dr. Imre Gyuk for funding this work and Dr. Stan Atcitty for technical supervision Sandia National Laboratories is a multi- program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DOE SBIR HV DC Link Grant #SC0008240 2 Phase Leg forms fundamental building block for AC/DC AND DC/AC Conversion

165

CX-005115: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-005115: Categorical Exclusion Determination Weld Substation Transformer Placement, Greeley, Weld County, Colorado CX(s) Applied: B4.6 Date: 01/07/2011 Location(s): Greeley, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration will install; one-150 megavolt-ampere transformer 230/115-kilovolt (KV2A), two-230-kilovolt power circuit breaker, four-230-kilovolt switches, one-115-kilovolt power circuit breaker, three-115-kilovolt switches, and associated bus, meter, and control equipment. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005115.pdf More Documents & Publications CX-002585: Categorical Exclusion Determination CX-008378: Categorical Exclusion Determination CX-008785

166

EIS-0422: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington, DOE/EIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft

167

Microsoft Word - AlbanyEugene_ROD-MAP_060112.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 1 Bonneville Power Administration's Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap

168

EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California  

Energy.gov (U.S. Department of Energy (DOE))

The Department of the Interior’s Bureau of Indian Affairs is preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency.

169

Western Area Power Administration Flatiron-Erie 115-kilovolt Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 Federal Register / Vol. 60, No. 161 / Monday, August 21, 1995 / Notices biomedical technology, and computational biology. One of the components of these programs deals with correctly assessing the dose to various systems that are exposed to radiation fields during treatment. These systems could range from biomolecules to different tissues and organs. The exposure to both patients and health care providers results from such sources as neutrons, high LET radiation, and low LET radiation such as electrons, x- rays, and gamma rays. In many situations, radiation could be combinations of the various radiation fields listed above. For example, development of improved methods for determination of dose to normal vs. cancerous tissue, and of strategies for maximizing the dose to cancerous tissue

170

EIS-0451: Hooper Springs Project, Caribou County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of DOE’s Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho.

171

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

172

CX-001411: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11: Categorical Exclusion Determination 11: Categorical Exclusion Determination CX-001411: Categorical Exclusion Determination Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project CX(s) Applied: B2.5 Date: 04/01/2010 Location(s): Idaho Falls, Idaho Office(s): Idaho Operations Office, Nuclear Energy This project increases the Uninterrupted Power Supply (UPS) capacity in the Idaho Falls (IF)-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 kilovolt-amphere (KVA) and 36 KVA) and installing a 225 KVA system. An approximately 15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required

173

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Pebble Springs-Marion 500-KV Line Study Area 75-B.  

SciTech Connect

Proposed is construction of an approximately 160 mile long, 500-kV, double-circuit transmission line from the proposed Pebble Springs Substation located southeast of Arlington, Oregon, to the existing Marion Substation, 11 miles west of Maupin, Oregon. Development is also proposed of a major switching complex, Pebble Springs Substation, near Arlington, Oregon. Depending on the final route chosen, from 45 to 71 miles of parallel, 9 to 42 miles of new, and 74 miles of existing right-of-way will be required. New access road requirements will range from 45 to 90 miles. Land use affected by the proposed facilities includes 800 to 855 acres of forestland removed from timber production. In addition, 50 miles of cropland, primarily wheat, and approximately 35 miles of grassland will be crossed. Disturbance to wildlife during construction will occur and habitat associated with the above land uses will be eliminated. Soil erosion and siltation, primarily during and immediately after construction will also occur. Visual impacts will occur near several highways, lakes, rivers, and recreation areas. Disturbances to nearby residents will occur during construction. An additional 45 acres of rangeland will be required for the proposed Pebble Springs Substation.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

174

Performance Assessment of the Marathon Power 3kVA Supercapacitor UPS  

Science Conference Proceedings (OSTI)

The objective of this report is to describe and document the operation and performance of the Marathon Power Supercapacitor UPS 120V system. This report will describe the different tests that were conducted and their results to characterize the Supercapacitor UPS system. It will cover voltage sag and swell protection, interruption, recloser, and life cycle capabilities of this system. Additional characterization tests will also be discussed. The Supercapacitor UPS was tested at 50%, 77% and 99% of ...

2012-11-28T23:59:59.000Z

175

Evaluation tests of Abacus 6 kVA utility-interactive inverter  

SciTech Connect

The voltage pattern spectra were analyzed for 100% and 50% pattern ratios and harmonics analyses are provided for the Abacus inverter. The harmonics are compared with those calculated for a simple model with no agreement. AC waveforms and inverter current spectra are given as well as basic electrical data. (LEW)

Landsman, E.E.

1981-08-01T23:59:59.000Z

176

Nuclear Maintenance Applications Center: Repair and Reconditioning Specification Guidance for AC Squirrel-Cage and Salient Pole Sync hronous Motors with Voltage Ratings of 2.3 to 13.2 kV: Revision 1 of 1000897  

Science Conference Proceedings (OSTI)

The power industry is experiencing a loss of expertise as the workforce ages and some work is being outsourced to specialty suppliers. Many of the major electric motors in plants were also beginning to experience aging effects. To assist with obtaining proper motor service, EPRI published Report 1000897, Repair and Reconditioning Specification for AC Squirrel-Cage Motors with Voltage Ratings of 2.3 to 13.2 kV in 2000.

2008-12-18T23:59:59.000Z

177

Field Demonstration of a 24-kV Warm Dielectric Cable at Detroit Edison: FY2002 Annual Progress Report for the Detroit Edison HTS Cab le Field Demonstration Project  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high temperature superconductor (HTS) power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The successful implementation of thi...

2003-02-26T23:59:59.000Z

178

Microsoft Word - BPA DEIS TOC Abstract Summary.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement July 2010 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Draft Environmental Impact Statement Bonneville Power Administration July 2010 Abstract DEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

179

Microsoft Word - BPA PFEIS Cover Abstract.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement February 2011 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration February 2011 FEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

180

Microsoft Word - Libby Troy FEIS TAC Master 5-7-08.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuild of the Libby (FEC) to Troy Section of Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration May 2008 Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); U. S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project, DOE/EIS - 0379 State Involved: Montana Abstract: The Libby-Troy transmission line, which is the 17-mile section of the 115-kilovolt (kV) transmission line that extends

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EA-1478: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

478: Finding of No Significant Impact 478: Finding of No Significant Impact EA-1478: Finding of No Significant Impact Hoover Dam Bypass Project Phase II, Nevada Western Area Power Administration proposes to double-circuit a portion of the Hoover Dam Bypass Project PHase II (Double-Circuiting a Portion of the Hoover-Mead No. 5 and No. 7 230-kilovolt (kv) Transmission LInes with the Henderson-Mead No. 1 230-kV Transmission Line. In addition, a fiber optic cable would be placed as an overhead ground wire on the double-circuited transmission lines form the area of Hoover Dam to Mead Substation. Finding of No Significant Impact Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No. 5 and No. 7 230-kilovolt (kv) Transmission LInes with the Henderson-Mead No. 1 230-kV

182

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

183

CX-010110: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus Montrose (HSP-MTR) 345-kilovolt (kV) transmission line located between Montrose and Norwood, Colorado. CX-010110.pdf More Documents & Publications CX-008790: Categorical Exclusion Determination

184

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

185

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

186

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facilty Location Evaluation for Franklin-Badger Canyon 230-kV Line and Badger Canyon Substation Study Area 74-6B.  

SciTech Connect

Proposed is the construction of a 15-mile, 230-kV double-circuit transmission line from Franklin Substation near Pasco, Washington, to a proposed new Badger Canyon Substation to be constructed 5 miles west of Kennewick, Washington. Depending on the final route location chosen, approximately 15 miles of 230-kV double circuit transmission line requiring 5.6 miles of new and 9.4 miles of existing right-of-way would be needed as well as approximately 2500 feet of new access road. Land use affected includes crossing Sacajawea State Park and passig through irrigated cropland and grassland on existing right-of-way, and depending on the alternative route chosen, could cross land proposed for residential development and a proposed interstate highway. An additional 10 to 11 acres of potential cropland would be required for the proposed substation. Disturbance to wildlife during construction would occur and habitat associated with the above land uses would be eliminated. Some erosion and sedimentation would occur. Visual impacts would affect Sacajawea State Park, a proposed highway, and potential residential development land. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

187

Introduction  

Science Conference Proceedings (OSTI)

...e ) ln linear-elastic fracture mechanics LEFM light-emitting diode LED length-to-diameter ratio L / D life cycle analysis (or assessment) LCA pound-force lbf pound lb length L liter; longitudinal direction; liquid L mean free path; length l kilowatt kW kilovolt kV kips (1000 lb) per square inch ksi kilopascal kPa...

188

Introduction  

Science Conference Proceedings (OSTI)

...e ) ln linear-elastic fracture mechanics LEFM light-emitting diode LED length-to-diameter ratio L/D life cycle analysis (or assessment) LCA pound-force lbf pound lb length L liter; longitudinal direction; liquid L mean free path; length l kilowatt kW kilovolt kV kips (1000 lb) per square inch ksi kilopascal kPa...

189

DOE/EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

190

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

191

CX-009197: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

192

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

193

Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

194

Microsoft Word - Central Ferry-Lower Monumental ROD.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Record of Decision March 2011 Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Record of Decision March 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west

195

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 2270 of 26,777 results. 61 - 2270 of 26,777 results. Page Special Topics in NEPA Documentation Selected documents covering Special Topics under NEPA. http://energy.gov/nepa/special-topics-nepa-documentation Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3

196

EIS-0422: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Record of Decision Record of Decision EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west through Garfield,

197

CX-008716: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

716: Categorical Exclusion Determination 716: Categorical Exclusion Determination CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration The Bonneville Power Administration (BPA) and Tacoma Power (TPWR) have developed a joint plan to convert the microwave transfer trip signals on BPA's Chehalis-Covington 230 kilovolt (kV) line, which includes the 230-kV tap line to TPWR's Cowlitz Substation, from analog to digital. Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx More Documents & Publications CX-006198: Categorical Exclusion Determination

198

CX-000602: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02: Categorical Exclusion Determination 02: Categorical Exclusion Determination CX-000602: Categorical Exclusion Determination Tillamook-Oceanside, 115-kilovolt Substation Interconnection CX(s) Applied: B4.6 Date: 01/07/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) substation terminal at Bay 6 of BPA's Tillamook Substation in order to accommodate Tillamook Public Utility District's (PUD's) request to interconnect its new Oceanside 115-kV transmission line. Relay and metering devices will compose the new terminal at Bay 6 where BPA will connect the last span of Tillamook PUD's new Oceanside 115-kV line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000602.pdf More Documents & Publications

199

CX-006257: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

257: Categorical Exclusion Determination 257: Categorical Exclusion Determination CX-006257: Categorical Exclusion Determination Ponderosa 500-230 Kilovolt (kV) Transformer Addition CX(s) Applied: B4.6 Date: 06/29/2011 Location(s): Prineville, Oregon Office(s): Bonneville Power Administration The proposed project includes modification of existing substation equipment, installation of a new 500-230-kilovolt (kV) transformer, and an eight acre expansion northwest of the existing yard. The yard expansion is to facilitate the addition of a new 230-kV 2-bay breaker-and-a-half bus, four bays and the new transformer. A new control house would be built to accommodate controls and protection for the new equipment. The existing road to the south would be modified and graveled. All activities would occur on previously disturbed soils within Bonneville Power

200

CX-001048: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48: Categorical Exclusion Determination 48: Categorical Exclusion Determination CX-001048: Categorical Exclusion Determination Lower Mid-Columbia/Midway - Vantage 230-Kilovolt Transmission Line Upgrade Project CX(s) Applied: B4.6, B4.7, B4.13 Date: 02/23/2010 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Upgrade the lower Mid-Columbia area 230-kilovolt (kV) transmission system in Grant and Benton counties, Washington. The project requires re-conductoring 10.6 miles of the Midway-Vantage 230-kV transmission line, re-terminating the existing Vantage-Columbia 230-kV line at the Vantage Substation, and installing related transmission and communications equipment within the Midway and Vantage substations. Upgrades are needed to mitigate thermal overloads due to Columbia River flow management changes

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CX-006816: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

816: Categorical Exclusion Determination 816: Categorical Exclusion Determination CX-006816: Categorical Exclusion Determination Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission Line CX(s) Applied: B4.6, B4.10 Date: 09/26/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration In response to the line and load interconnection request submitted by Coos-Curry, Bonneville Power Administration (BPA) proposes to provide and install tap jumpers between BPA?s Fairview-Bandon 115-kilovolt (kV) transmission line and Coos-Curry?s new 115/24.9-kV substation. The tap jumpers would consist of line extensions from the BPA Fairview-Bandon #1 115-kV line to the Coos-Curry conductors terminated on the "H" frame wood

202

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

203

<AVS>  

NLE Websites -- All DOE Office Websites (Extended Search)

Antelope Valley Station to Neset Transmission Project Antelope Valley Station to Neset Transmission Project This environmental impact statement (EIS) prepared by the U.S. Department of Agriculture (USDA), Rural Utilities Service (RUS) provides information about the potential environmental impacts of the proposed Antelope Valley Station (AVS) to Neset Transmission Project. This project, proposed by Basin Electric Power Cooperative (Basin Electric), would include a new 345-kilovolt (kV) transmission line connecting the existing AVS, Charlie Creek, Williston, and Neset substations and the newly proposed Judson and Tande 345-kV substations. In addition to the approximately 190 miles of new 345-kV transmission line, the project would also construct two new 345 kV substations (Judson Substation west of Williston and Tande Substation southeast of Tioga), and several miles of 230-kV transmission line to connect the 345-kV transmission line into the existing area system.

204

104 Royal Swedish Academy of Sciences 2001 Ambio Vol. 30 No. 2, March 2001 http://www.ambio.kva.se  

E-Print Network (OSTI)

gasoline easier. Russian refineries can run their catalytic reformers at full capacity while their through) using catalytic reforming alone (V. N. Styazhkin, Chief Engineer, Khabarovsk refinery, 1999, pers. comm gasoline usually re- quires petroleum refinery upgrades for construction of modern alkylation and catalytic

Thomas, Valerie

205

Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section Page S:\COMM\NEPA\TODO \EA1383\EATOC1 -R.DOC 4/1/02 -i- 1.0 INTRODUCTION 1-1 1.1 BACKGROUND 1-1 1.2 SCOPE OF PROJECT 1-2 1.3 PURPOSE AND NEED 1-3 1.4 AGENCY ACTIONS 1-3 1.4.1 Federal 1-3 1.4.1.1 U.S. Department of Energy 1-3 1.4.1.2 U.S. Fish and Wildlife Service 1-4 1.4.2 Other Agenc y Actions 1-4 1.4.2.1 California Energy Commission 1-4 1.4.2.2 California Department of Fish and Game 1-4 1.4.2.3 State Historic Preservation Office 1-5 1.4.2.4 San Diego County 1-5 2.0 PROPOSED ACTION AND ALTERNATIVES 2-1 2.1 NO ACTION ALTERNATIVE 2-1 2.2 PROPOSED ACTION 2-1 2.2.1 Proposed Amendment to Presidential Permit (PP-68) 2-2 2.2.2 Description of Proposed Project Components and Activities 2-3 2.2.2.1 Otay Mesa 230 kV Switchyard 2-3

206

Libby-Troy Line Rebuild Project - July 25, 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

207

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

208

EIS-0344: Draft Envrionmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Draft Envrionmental Impact Statement 4: Draft Envrionmental Impact Statement EIS-0344: Draft Envrionmental Impact Statement Grand Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project. Bonnewille Power Administration (BPA) would construct a new 500-kilovolt (kV) transmission line that would replace a single-circuit 115-kV transmission line in an exisiting corridor that has multiple transmission lines for most of the project's length. The transmission line would extend between the Grand Coulee 600-kV Switchyard and Bell Substation near Spokane, a distance of 84 miles. Detailed information about the project and its environmental impacts

209

CX-000600: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

600: Categorical Exclusion Determination 600: Categorical Exclusion Determination CX-000600: Categorical Exclusion Determination Supervisory Control and Data Acquisition Upgrades at Bonneville Power Administration's Hungry Horse, Bonneville, and Grand Coulee Substations CX(s) Applied: B4.6 Date: 01/12/2010 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install Supervisory Control and Data Acquisition (SCADA) upgrades at the United States Army Corps of Engineers' Bonneville 115-kilovolt (kV) Switchyard, and the United States Bureau of Reclamation's Grand Coulee 115-kV, 230-kV, and 500-kV Switchyards and Hungry Horse 230-kV Switchyards. The SCADA upgrade at each switchyard will provide BPA the system monitoring and control necessary to

210

CX-000599: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-000599: Categorical Exclusion Determination Flathead Substation Bay Addition - L0307 CX(s) Applied: B4.6 Date: 01/13/2010 Location(s): Flathead County, Montana Office(s): Bonneville Power Administration Flathead Electric Cooperative (FEC) has requested a new 230-kilovolt (kV) point of delivery at Bonneville Power Administration's (BPA's) Flathead Substation to serve FEC's new 230/69-kV transformer and 69-kV system upgrades. FEC is upgrading their 34.5-kV sub-transmission system to 69-kV operation to serve continued load growth in the greater Kalispell, Montana area. In order to accomodate this request, BPA proposes to expand the Flathead Substation yard to convert and existing bay (BAY #15) to connect FEC's new transformer and relocate the equipment from the converted bay to

211

500-kV Transmission Line Design  

Science Conference Proceedings (OSTI)

The design of an extrahigh-voltage (EHV) transmission line involves an integrated analysis and comparison of influencing factors to develop a structure configuration and conductor/shieldwire system that will provide safe, reliable, and economic service. Many of the parameters in design have varied impacts on the performance characteristics of a transmission line: safety, reliability, capital cost, and lifetime cost. The interdependencies are many and technical in nature. Having a solid knowledge of the p...

2011-02-04T23:59:59.000Z

212

CX-003611: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Categorical Exclusion Determination 1: Categorical Exclusion Determination CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) has a need to replace old and worn spacer-dampers on approximately 78 miles of the Schultz - Raver Number 3 and 4 500-kilovolt (kV) transmission lines. Manned aerial carts that ride on the transmission line conductors would be used to change out the spacers. The carts would be placed on the transmission line by helicopter prior to line crews accessing the carts to perform the work. New spacers would be delivered by helicopter to the carts. Once the old spacers are

213

Microsoft Word - GrandCoulee_FinalEA_CommentResponses.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1679 December 2011 Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Revision Sheet for the Environmental Assessment 2 SUMMARY This revision sheet documents the changes to be incorporated into the Grand Coulee's Third Powerplant 500-kilovolt (kV) Transmission Line Replacement Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On May 2, 2011, the Preliminary EA was sent to agencies and interested parties.

214

EA-1588: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

88: Final Environmental Assessment 88: Final Environmental Assessment EA-1588: Final Environmental Assessment Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation The U.S. Army Corps of Engineers proposes to construct a new vehicle bridge across the American River Downstream about 800 feet east and 1,100 feet west of Folsom Dam, which will be located in an existing right-of-way currently occupied by the Sacramento Municipal Utility District double-circuit Orangevale-Lake/Whiterock-Orangevale 230-kilovolt and 12-kilovolt transmission lines. Finding on No Significant Impact for the Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation, EA-1588 (January 2007) More Documents & Publications EA-1588: Finding of No Significant Impact

215

Introduction  

Science Conference Proceedings (OSTI)

...cm centimeter cal calorie d day eV electron volt F farad ft foot g gram G gauss Gy gray GHz gigahertz h hour Hz hertz in. inch J joule K Kelvin kbar kilobar keV kiloelectron volt kg kilogram kHz kilohertz kPa kilopascal ksi kips (1000 lb) per square inch kV kilovolt kW kilowatt L liter lb pound m...

216

EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the potential environmental impacts of a BPA proposal to rebuild its 58 mile long, 115 kilovolt (kV) wood pole Keeler-Forest Grove and Forest Grove-Tillamook transmission lines. The deteriorated transmission line structures (wood pole structures, switches, cross arms, braces, guys, anchors, insulator assemblies and conductor) need to be replaced in order to maintain reliable electrical service, avoid risks to the public, and ensure worker safety.

217

ELECTRIC POWER AND VENTILATION SYSTEM OF SILOE  

SciTech Connect

The 15-kv electric power of Siloe is supplied from a central substation, which serves all the laboratories in the Center. The substation transforms primary 3-phase power from 15 kv to 380 to 220 v. Control installations are supplied from sets of rectifiers and batteries with 127 and 48 v direct current. If the normal electric power supply fails, a 12000 kva diesel driven generator is automatically started and in a very short time supplies power. The ventilation system supplies the whole building with conditioned air, holds the shell in negative pressure, and exhausts radioactive effluents. (auth)

Mitault, G.; Faudou, J.-C.

1963-12-01T23:59:59.000Z

218

EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Notice of Intent to Prepare an Environmental Impact 1: Notice of Intent to Prepare an Environmental Impact Statement EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the proposed construction, operation, and maintenance of a 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would be located adjacent to PacifiCorp's existiog 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. The new 115-kV single-circuit BP A transmission line would exlend generally north and east from these

219

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

220

CX-006483: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

83: Categorical Exclusion Determination 83: Categorical Exclusion Determination CX-006483: Categorical Exclusion Determination Balancing Authority Area Service Agreement with Lane Electric Cooperative, Inc. CX(s) Applied: B4.1 Date: 08/03/2011 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration The Project consists of two 500 kilowatt (kW) photovoltaic solar inverters totaling 1000 kW. The Project interconnects to Lane Electric Cooperative, Inc.?s (LEC) 12.5-kilovolt (kV) AB Circuit, then to LEC?s 34.5/12.5-kV Fox Hollow Substation. The point of interconnection of LEC?s Fox Hollow Substation to the Federal Columbia River Transmission System is at Bonneville Power Administration's (BPA) 115/34.5-kV Eugene Substation via LEC?s 34.5-kV Fox Hollow-Eugene Circuit. The proposed agreement would

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Curecanti-Lost Canyon 230-kV Transmission Line Routine Maintenance of Right-of-Way Roads La Plata, Montezuma, Dolores, San Miguel, and Montrose Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus- Montrose (HSP-MTR) 345-kilovolt (leV) Transmission Line located between Montrose and Norwood, Colorado. The project will provide safe access to transmission line structures 0 to 194 (approximately 110 miles). Also, Westem proposes to perform routine maintenance between structures 40/1 to 59/5 of the Curecanti-Lost Canyon (CCI-LCN) 230-kV Transmission Line. The

222

Integrating wind turbines into the Orcas Island distribution system  

DOE Green Energy (OSTI)

This research effort consists of two years of wind data collection and analysis to investigate the possibility of strategically locating a megawatt (MW) scale wind farm near the end of an Orcas Power and light Company (OPALCO) 25-kilovolt (kV) distribution circuit to defer the need to upgrade the line to 69 kV. The results of this study support the results of previous work in which another year of wind data and collection was performed. Both this study and the previous study show that adding a MW-scale wind farm at the Mt. Constitution site is a feasible alternative to upgrading the OPALCO 25-kV distribution circuit to 69 kV.

Zaininger, H.W. [Zaininger Engineering Co., Roseville, CA (United States)

1998-09-01T23:59:59.000Z

223

Draft Environmental Impact Statement Klondike III/Biglow Canyon Wind Integration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary S-1 Summary S-1 Summary In this Summary: * Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the draft Environmental Impact Statement (EIS) prepared for the Klondike III/Biglow Canyon Wind Integration Project proposed by the Bonneville Power Administration (BPA). The project includes constructing a new double-circuit 230-kilovolt (kV) transmission line in northern Sherman County, Oregon. The new line would connect the Klondike III Wind Project and the Biglow Canyon Wind Farm to BPA's existing John Day 500-kV Substation. The project would also require expansion of BPA's existing John Day 500-kV Substation and a new 230-kV substation to integrate the two wind projects. As a federal agency, BPA is required by the National Environmental Policy Act

224

Managing Distributed Temperature Measurements in an Embedded System of a 3-Phase 10 kVA Energy Efficient Switchable Distribution Transformer Employing a Modular Approach  

Science Conference Proceedings (OSTI)

Temperature measurements are one of the most significant factors in condition monitoring and protecting transformers as well as estimating their life expectancy. With switchable transformers, it is also significant to carry out temperature monitoring ... Keywords: Switchable Transformer, Distributed Temperature Measurement, Controller Area Network, Modular Approach

H. A. Dharmawan; S. A. M. Ali

2010-12-01T23:59:59.000Z

225

EIS-0308: Record of Decision and Floodplain Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Record of Decision and Floodplain Statement 8: Record of Decision and Floodplain Statement EIS-0308: Record of Decision and Floodplain Statement Interconnection of the Southpoint Power Plant with the Wester Area Power Administration's Parker-Davis No. 1 and No. 2, 230-kilovolt Transmission Lines Western has determined that no significant environmental impacts will result from construction, operation and maintenance of Calpine Corporation's Southpoint Power Plant, the two natural gas pipelines, or the approximately 7 miles of high voltage transmission lines, or from the upgrade of the Parker-Davis No. 1 230-kilovolt (kV) transmission line. Therefore, Western has decided to provide an interconnection with the plant and Western's transmission system in west central Arizona. However, Calpine has yet to obtain a permit from the Bureau of Land Management (BLM)

226

EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Notice of Intent to Prepare an Environmental Impact : Notice of Intent to Prepare an Environmental Impact Statement EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana BPA intends to prepare an EIS on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. DOE/EIS-0379, Bonneville Power Administration, Notice of Intent to prepare

227

EIS-0159: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

159: Record of Decision 159: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

228

CX-006303: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Categorical Exclusion Determination 03: Categorical Exclusion Determination CX-006303: Categorical Exclusion Determination Interconnection of the Pronghorn Gas Plant 115 Kilovolt Transmission Line CX(s) Applied: B4.11 Date: 07/14/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region In order to bring power into Western's substation, Upper Missouri and Roughrider must interconnect their Pronghorn substation, located in SEC 17 T140N R99W, to the proposed South Heart substation, located in SEC20 T140N R98W, and then the South Heart substation to Western's Belfield substation, located in SEC20 T140N R98W. This would be accomplished by building a roughly eight mile stretch of 115-kilovolt (kV) transmission line east-west between Pronghorn and South Heart, and a north-south tie-line of less than

229

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 30240 of 31,917 results. 31 - 30240 of 31,917 results. Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008713: Categorical Exclusion Determination 2012 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008713-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV),

230

CX-008399: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

99: Categorical Exclusion Determination 99: Categorical Exclusion Determination CX-008399: Categorical Exclusion Determination Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) will repair erosion damage at Structure No. 110-3 of the Dave Johnston to Stegall 230 kilovolt (kV) transmission line located near southeast Torrington. Wyoming. Flood flows along the North Platte River in 2011 migrated the active channel bank towards Structure No. 110-3. The potential exists for future channel meandering to underline the foundation supports of the 80 foot steel lattice structure. To mitigate this potential, Western proposes to

231

CX-008378: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8378: Categorical Exclusion Determination 8378: Categorical Exclusion Determination CX-008378: Categorical Exclusion Determination Archer 230 Kilovolt Bay Addition for New Point of Delivery - Stage 07 CX(s) Applied: B4.6 Date: 03/08/2012 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region Tri-State Generation and Transmission Association, Inc. (Tri-State), has requested an interconnection to Western Area Power Administration's (Western) Archer 230/115-Kilovolt (kV) Substation (Archer Substation). The Archer Substation is a Designated Point of Delivery from Western to Tri-State as set forth in Exhibit A of Contract No. 87-LAO-172 (TS-89-0005), Finn Electric Service (Contract). CX-008378.pdf More Documents & Publications CX-010891: Categorical Exclusion Determination

232

CX-003624: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

624: Categorical Exclusion Determination 624: Categorical Exclusion Determination CX-003624: Categorical Exclusion Determination Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/12/2010 Location(s): Gray's Harbor County, Washington Office(s): Bonneville Power Administration Replacement of twenty 22-L structures on the Satsop-Aberdeen Number 2 230-kilovolt (kV) transmission line. The project work would involve removal of the existing towers and building replacement towers, replacing insulators, and attaching the existing conductor to the new towers. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003624.pdf More Documents & Publications CX-003025: Categorical Exclusion Determination CX-001179: Categorical Exclusion Determination

233

CX-008790: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). CX-008790.pdf More Documents & Publications CX-009411: Categorical Exclusion Determination

234

CX-005379: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5379: Categorical Exclusion Determination 5379: Categorical Exclusion Determination CX-005379: Categorical Exclusion Determination Insulator Replacement in Agricultural Lands Along the Grand Coulee-Bell Number 3/Grand Coulee-Westside No. 1 Double Circuit 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/02/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace worn insulators on sections of the Grand Coulee-Bell Number 3/Grand Coulee-Westside Number 1 double circuit 230-kilovolt (kV) transmission line. This portion of the transmission line is located in Lincoln County, Washington, in BPA?s Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed below.

235

CX-008377: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

377: Categorical Exclusion Determination 377: Categorical Exclusion Determination CX-008377: Categorical Exclusion Determination Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration's (Western) Casper Field Office proposes to replace deteriorating poles on 18 wood H-frame structures along its Alcova-Casper North 115 kilovolt (kV) transmission line. The project structures are located on the transmission line between Township 33 North, Range 80 West, Section 12 and Township 30 North, Range 82 West, Section 18, 6th Principle Meridian near Casper, Wyoming in Natrona County. CX-008377.pdf More Documents & Publications CX-010551: Categorical Exclusion Determination

236

CX-008380: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-008380: Categorical Exclusion Determination Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230 kilovolt (kV) transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town of Nunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of way easement.

237

EIS-0422: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Final Environmental Impact Statement 422: Final Environmental Impact Statement EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.

238

EIS-0159: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Record of Decision 9: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

239

EIS-0422: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.

240

CX-006819: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) will perform routine maintenance and replacement of aging wood pole transmission line support structures, including all hardware and guy support structures on the Centralia Tap to Chehalis-Covington No. 1 230-kilovolt (kV) transmission line. The transmission line is owned and operated by Trans Alta and BPA maintains the line at Trans Alta?s expense. Trans Alta is contracting with BPA to complete the maintenance work.

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 9190 of 29,416 results. 81 - 9190 of 29,416 results. Download CX-006302: Categorical Exclusion Determination Colville-Republic Rebuild Project CX(s) Applied: B1.3, B4.6 Date: 07/21/2011 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006302-categorical-exclusion-determination Download CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-003611-categorical-exclusion-determination Download CX-004257: Categorical Exclusion Determination Replace Spacer Dampers Along the Slatt-John Day Number 1 500-Kilovolt

242

CX-010098: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Categorical Exclusion Determination 8: Categorical Exclusion Determination CX-010098: Categorical Exclusion Determination Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration (WAPA) proposes to install bird discouragers on a portion of the PHX-LOB 230-kV (kilovolt) transmission line. Access is via existing rural and transmission line access roads. Birds perching on structures are causing line faults and tripping the line out of service. The purpose of the project is to insure the continued safe and reliable operation of the bulk power system by reducing or eliminating faults due to bird activity along the line.

243

CX-008381: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

381: Categorical Exclusion Determination 381: Categorical Exclusion Determination CX-008381: Categorical Exclusion Determination Big Thompson to Flatiron 13.8 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace four existing single wood pole structures along the Big Thompson to Flatiron 13.8 kilovolt (kV) transmission line. The structures are located along a previously disturbed area adjacent to the Horsetooth Supply Canal in Larimer County, Colorado. The structures will be replaced in-kind with single wood poles of the same height, hardware, configuration, and in the same location. CX-008381.pdf More Documents & Publications

244

CX-008714: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8714: Categorical Exclusion Determination 8714: Categorical Exclusion Determination CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace 18 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) as well as cross arms on three other structures along the subject transmission lines. Microsoft Word - CX-Alvey-FairviewAlvey-MartinCreek-DrainWoodPolesFY12_WEB.doc More Documents & Publications CX-010344: Categorical Exclusion Determination

245

EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50: Notice of Intent To Prepare an Environmental Impact 50: Notice of Intent To Prepare an Environmental Impact Statement EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada The Bureau of Land Management (BLM) Wyoming State Office, Cheyenne, Wyoming, intends to prepare an Environmental Impact Statement (EIS) analyzing the impacts of a right-of-way (ROW) application for the TransWest Express 600-kilovolt (kV) Direct Current Transmission Project (Project) and potential land use plan amendments Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada

246

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Midway Substation 230-kV Upgrades Midway Substation 230-kV Upgrades El Paso County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to modify components within the Midway Substation 230-kilovolt (kV) yard to accommodate upgrades being performed by Tri-State Generation and Transmission Association, Inc. Western's proposed modifications would occur entirely within the fenced perimeter of the substation located in Township 17S, Range 65W, Section 20 of El Paso County, Colorado. Western would re-conductor the main and transfer strain buses with I ,272 kcmil (thousands of circular mils) Aluminum Conductor Steel Supported (ACSS) at the Midway Substation. The duplex I ,590 kcmil All Aluminum Conductor (AAC) jumpers on each bay in the substation would be installed. The

247

Categorical Exclusion (CX) Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reroute of Jamestown-Grand Forks 230 kV transmission line near Hannaford, North Reroute of Jamestown-Grand Forks 230 kV transmission line near Hannaford, North Dakota. Description of Proposed Action: Western is planning to reroute approximately two miles of its Jamestown-Grand Forks 230-kilovolt (kV) transmission line. The reroute will occur in SECI and 11 T144N R60W in Griggs County, North Dakota. The purpose of moving the transmission line is to relocate the line out of a wetland to a more upland site. Construction will occur late summer or fall of2012. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.13: Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric power lines approximately 20 miles in length or less to enhance environmental and land use values. Such

248

CX-007164: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

164: Categorical Exclusion Determination 164: Categorical Exclusion Determination CX-007164: Categorical Exclusion Determination Prescott-Pinnacle Peak & Pinnacle Peak-Rogers Aerial Marker Ball Addition CX(s) Applied: B1.9 Date: 01/07/2011 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes removing two existing marker balls at structures 0/4 & 0/5 of the Pinnacle Peak-Rogers #1 & #2 230-kilovolt (kV) double circuit transmission line & installing aerial marker ball equipment on all static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kV transmission line on the north side of structures 216/1-216/3 & the southeast side of structures 0/3-0/5 on the Pinnacle Peak-Rogers #1 & #2 230-kV double circuit transmission line. The diverters will be installed

249

EA-1665: Final Environmental Assessment and Finding of No Significant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment and Finding of No Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV Transmission Line Rebuild Project, Mohave County, Arizona For more information, contact: Ms. Linette King Desert Southwest Region Western Area Power Administration P.O. Box 6457 Phoenix, AZ 85005-6457 Telephone: 602-605-2434 Fax: 602-605-2630 Electronic mail: lking@wapa.gov The Western Area Power Administration (Western) plans to rebuild a 26.2-mile-long portion of the existing Davis-Kingman Tap 69-kilovolt (kV) Transmission Line located in Mohave County,Arizona. The existing Davis-Kingman Tap 69-kV Transmission Line originates in Bullhead City, Arizona, at the Davis Dam Switchyard and extends northwest of Kingman, Arizona, four

250

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

251

Microsoft Word - PonderosaSub_TransformerAdd_CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amy Freel - TEP TPP 1 Amy Freel - TEP TPP 1 Proposed Action: Ponderosa 500-230 kilovolt (kV) Transformer Addition Budget Information: 00276365 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions/modifications to electric power transmission facilities within previously developed Facility area..." Location: Prineville, Crook County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, installation of a new 500-230-kV transformer, and an eight acre expansion northwest of the existing yard. The yard expansion is to facilitate the addition of a new 230-kV 2-bay breaker-and-a-half bus, four bays and the new transformer. A new control

252

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

253

EIS-0451: Hooper Springs Project, Caribou County, Idaho | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Hooper Springs Project, Caribou County, Idaho 1: Hooper Springs Project, Caribou County, Idaho EIS-0451: Hooper Springs Project, Caribou County, Idaho Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. Public Comment Opportunities None available at this time. Documents Available for Download March 11, 2013 EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho March 8, 2013

254

CX-000601: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

601: Categorical Exclusion Determination 601: Categorical Exclusion Determination CX-000601: Categorical Exclusion Determination New Revenue Meters at Central Lincoln's Florence and Berrydale Substations CX(s) Applied: B4.6 Date: 01/07/2010 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration plans to upgrade revenue metering at Central Lincoln People's Utility District's (Central Lincoln) Florence and Berrydale Substations to 115-kilovolt (kV). Bonneville will retire the 12.5-kV revenue metering at Central Lincoln's Florence, Berrydale, and Heceta Beach Substations once acceptance tests of the new 115-kV metering at Florence and Berrydale Substations are completed. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000601.pdf More Documents & Publications

255

Categorical Exclusion (CX) Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pronghorn Gas Plant 115 kV transmission line. Pronghorn Gas Plant 115 kV transmission line. Description of Proposed Action: Western received an interconnection request from Upper Missouri G & T Electric Cooperative Inc's (Upper Missouri) member Roughrider Electric Cooperative, Inc. (Roughrider) to interconnect at Western's Belfield Substation in November of2010. The request for interconnection is for a line bay addition to the existing 230-kilovolt (kV) ring bus at Western's Belfield substation; as well as the installation of a revenue meter at a proposed new substation, South Heart substation, owned and operated by Upper Missouri. In order to bring the power into Western's substation, Upper Missouri and Roughrider must interconnect their Pronghorn substation, located in SEC 17 T140N R99W, to the proposed South Heart substation, located in

256

CX-005844: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-005844: Categorical Exclusion Determination Peninsula Light Company Line and Load Interconnection Request L0308 CX(s) Applied: B4.6 Date: 05/05/2011 Location(s): Mason County, Washington Office(s): Bonneville Power Administration Peninsula Light Company (PLC) submitted a request to Bonneville Power Administration (BPA) for an emergency 115-kilovolt (kV) connection to BPA?s Shelton-Kitsap #2 115-kV line in order to serve its load in the event of a double circuit loss at the Tacoma Narrows Crossing. In response to PLC?s request, BPA is proposing to construct a double tap scheme on BPA?s Shelton-Kitsap #2 115-kV line at structures 18/1 and 18/2. This proposal would allow PLC an emergency connection to serve its load over Tacoma

257

EA-1456: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56: Final Environmental Assessment 56: Final Environmental Assessment EA-1456: Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Loveland, Colorado Western Area Power Administration (Western) is proposing to upgrade the existing Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines and making modifications to Western's existing Miracle Mile, Cheyenne and Ault Substations to accommodate the 230-kV circuits. A new Snowy Range Substation would also be build near Laramie, Wyoming. DOE/EA-1456; Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Western Area Power

258

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

259

CX-006889: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-006889: Categorical Exclusion Determination Bristol to Groton Transmission Line Upgrade Project CX(s) Applied: B4.11 Date: 10/11/2011 Location(s): South Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Western Area Power Administration (WAPA) Bristol to Groton 115 kilovolt (kV) transmission line is to be upgraded in association with the Just Wind Napoleon Wind Farm. The Just Wind Napoleon Wind Farm will produce 367 megawatts (MW) when complete. Plans call for production of 100 MW at the end of 2010, with the remaining 267 MW coming online at a later date. The existing 115-kV conductor will need to be replaced with a new 795 MCM (thousands of circular mills) 115-kV conductor line before the full 367 MW

260

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36: I-5 Corridor Reinforcement Project, Multnomah County, 36: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash., to a new 500-kV substation near Troutdale, Ore. After initially identifying a large number of route segments, BPA combined those segments into four action alternatives (each with options): West, Central, East, and Crossover. The action alternatives and the No Action Alternative are analyzed in the draft EIS. The alternatives vary in length and include both existing and new

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CX-007148: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48: Categorical Exclusion Determination 48: Categorical Exclusion Determination CX-007148: Categorical Exclusion Determination Gila Substation Electrical Equipment Replacement CX(s) Applied: B4.6 Date: 05/03/2011 Location(s): Yuma County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace a 34.5-kilovolt (kV) circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads and vehicles such as backhoes, dozers, bucket trucks, crew trucks and pickup trucks to bring personnel and equipment to the work areas. This work is

262

CX-005383: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

383: Categorical Exclusion Determination 383: Categorical Exclusion Determination CX-005383: Categorical Exclusion Determination Elliot Substation Construction and Transmission Line 43.8kV Transmission Line CX(s) Applied: B4.11 Date: 03/02/2011 Location(s): Elliot, North Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, North Dakota to be owned and operated by Western under Western's Valley City to Forman 115-kilovolt (kv)transmission line in addition to 8 miles of new 43.8-kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005383.pdf More Documents & Publications

263

EA-1470: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-1470: Finding of No Significant Impact Harry Allen-Mead 500 kV Transmission Line Project, Nevada Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). Based on the EA, BLM, and Western errata, Western has determined that the proposed transmission line would not result in any significant environmental impacts, and the preparation of an environmental impact statement (EIS) will not be required. Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project, DOE/EA-1470 (October 2004)

264

Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

United States. Bonneville Power Administration

2006-10-25T23:59:59.000Z

265

Data:Af9aae14-bfe0-4801-b03b-10ed3f92cdc7 | Open Energy Information  

Open Energy Info (EERE)

aae14-bfe0-4801-b03b-10ed3f92cdc7 aae14-bfe0-4801-b03b-10ed3f92cdc7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2013/05/01 End date if known: Rate name: LP - Large Power Service Sector: Industrial Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. Transmission Voltage Discount (for delivery at 69 kV or higher): $2.342 per kVa per month for all kVa of Billing Demand.

266

Data:Ab19a097-e4a5-4a7d-84d3-8637e2963a7c | Open Energy Information  

Open Energy Info (EERE)

9a097-e4a5-4a7d-84d3-8637e2963a7c 9a097-e4a5-4a7d-84d3-8637e2963a7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grayson Rural Electric Coop Corp Effective date: 2012/06/01 End date if known: Rate name: Schedule 4- Large Power Service Sector: Industrial Description: Available to consumers located on or near the Cooperative's facilities for Commercial service. Consumers shall contract for a definite amount of electrical capacity in kilovolt-amperes which shall be sufficient to meet normal maximum requirements but in no case shall the capacity contracted be less than 50 KVA. The Cooperative may not be required to supply capacity in excess multiples of 25 KVA.

267

Data:Ea9c8db7-2e8a-4b9b-a30f-26e3cdf78e0c | Open Energy Information  

Open Energy Info (EERE)

c8db7-2e8a-4b9b-a30f-26e3cdf78e0c c8db7-2e8a-4b9b-a30f-26e3cdf78e0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Pitcairn, Pennsylvania (Utility Company) Effective date: End date if known: Rate name: Large Power Service Sector: Commercial Description: Availability for commercial or industrial service. Customers shall contract for a definite amount of electrical capacity in kilovolt-amperes which shall be sufficient to meet normal maximum requirements but in no case shall the capacity contracted for be less than 50 kva. The Utility may not be required to supply capacity in excess of that contracted for except by mutual agreement. Contracts will be made in multiples of 25 kva.

268

A versatile 150 kV neutron generator - Springer  

Science Conference Proceedings (OSTI)

Home · Contact Us · Download PDF (1,699 KB) ... Other actions. Export citation · Register for Journal Updates · About This Journal · Reprints and Permissions ...

269

EA-1591: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact EA-1591: Finding of No Significant Impact Palisades - Goshen Transmission Line Reconstruction Project The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan

270

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

271

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

272

EIS-0457: Record of Decision | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Record of Decision Record of Decision EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR BPA decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. EIS-0457-ROD-MAP-2012.pdf More Documents & Publications EIS-0457: Mitigation Action Plan EIS-0457: Final Environmental Impact Statement

273

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2009 7, 2009 CX-001263: Categorical Exclusion Determination Hire a Consultant CX(s) Applied: A9, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Livingston, Louisiana Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001255: Categorical Exclusion Determination Energy Efficiency (EE) and Conservation, Loan Program, EE Upgrades, and Update Traffic Lights CX(s) Applied: A1, A8, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Bridgeport, Connecticut Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001253: Categorical Exclusion Determination Build and Operate 33-kilovolt (kV)/12kV Substation at the Southern California Logistics Airport CX(s) Applied: B4.11, B5.1 Date: 12/17/2009 Location(s): Victorville, California Office(s): Energy Efficiency and Renewable Energy

274

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

275

CX-003789: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

789: Categorical Exclusion Determination 789: Categorical Exclusion Determination CX-003789: Categorical Exclusion Determination Grandview-Red Mountain Number 1 Proposed Transmission Line Interconnection CX(s) Applied: B4.6 Date: 09/08/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to construct a 115-kilovolt (kV) tap point consisting of two 115-kV sectionalizing switches with loop breaking capability on the Grandview-Red Mountain Number 1 transmission line between structures 18/1 and 18/2 in order to accommodate an interconnection request by Benton Rural Electric Association (REA) for their Acord Substation development project. BPA would be responsible for revenue metering at the new Acord Substation, and for the tap, which would

276

CX-004263: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-004263: Categorical Exclusion Determination L0295 - Saint Johns-Saint Helens Number 1 Interconnection Project CX(s) Applied: B4.6 Date: 10/15/2010 Location(s): Columbia County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new tap and associated disconnect structures on BPA?s Saint Johns-Saint Helens Number 1 115-kilovolt (kV) transmission line to provide a point of interconnection for Columbia River Public Utility District's (CRPUD's) new Columbia River Substation. CRPUD is constructing the new 115-kV substation in Columbia County, Oregon to serve residential load growth in the area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004263.pdf More Documents & Publications

277

CX-007131: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

278

EA-1542: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42: Finding of No Significant Impact 42: Finding of No Significant Impact EA-1542: Finding of No Significant Impact Burleigh County Wind Energy Center, North Dakota Basin Electric Power Cooperative (Basin), on behalf of FPL Energy Burleigh County Wind, LLC (Burleigh County Wind), applied to the Department of Energy (DOE), Western Area Power Administration (Western) to interconnect the Burleigh County Wind Energy Center in Burleigh County, North Dakota, to Western's Garrison-Bismarck 230-kilovolt (kV) Transmission Line. Burleigh County Wind proposes to build a wind energy center consisting of wind turbines, collection subtransmission lines, and a collection substation. Western would construct facilities to support the interconnection at the Garrison-Bismarck 230-kV Transmission Line. Central Power Electric

279

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind Project to BPA's 500-kV transmission system.

280

EA-1595: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95: Finding of No Significant Impact 95: Finding of No Significant Impact EA-1595: Finding of No Significant Impact Davis-Mead 230-kV Transmission Line Reconductor Project, Mohave County, Arizona and Clark County, Nevada Western Area Power Administration proposes to reconductor the existing 61-mile long 230-kilovolt Davis-Mead Transmission Line located in Clark County, Nevada and Mohave COunty, Arizona. Western owns and operates the existing transmission line. THe transmission line is a mjor component of the electric transmisison grad of the western United States. Department of Energy, Western Area Power Administration Finding of No Significant Impact and Floodplain Statements of Findinds Davis-Mead 230-kV Transmission Line Reconductor Project More Documents & Publications EA-1595: Final Environmental Assessment

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Microsoft Word - CX-SundialIsland-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP- TPP- 1 Proposed Action: Sundial Island Transmission Tower Relocation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Multnomah County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to relocate two transmission towers located on Sundial Island in the Sandy River Delta Recreation Area (SRD). The transmission towers, Big Eddy-Troutdale No. 1 230-kilovolt (kV) tower 77/1 and Ostrander-Troutdale No. 1 500-kV tower 24/1, are being compromised by stream bank erosion. Sundial Island is located within the Columbia River Gorge National Scenic Area (NSA) and is a

282

Microsoft Word - CX-Hatwai-DworshakSpacerReplacementFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 24, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: 2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Hatwai-Dworshak No. 1 500-kV transmission line project is located in Clearwater and Nez Perce counties, Idaho, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed Table 1:

283

CX-007819: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-007819: Categorical Exclusion Determination Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) and U.S. Bureau of Reclamation require a permanent solution to the inherent hazards of large blocks of ice forming on the Yellowtail Dam on the Bighorn River. In recent years, ice blocks have formed on the dam face and are falling on to the existing configuration of the Yellowtail 115 kilovolt (kV), 230-kV tie lines, and electrical equipment at the Power Plant, causing irreparable damage. CX-007819.pdf More Documents & Publications EA-1617: Final Environmental Assessment

284

Microsoft Word - G0418 Mariah Wind CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kevlyn Mathews Kevlyn Mathews Project Manager - TPCV-TPP-4 Proposed Action: Mariah Wind, LLC Small Generator Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment Location: Boardman, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate Mariah Wind, LLC's 20 megawatt wind project into BPA's balancing authority in response to Mariah Wind LLC's small generator interconnection request. The proposed point of interconnection is at Columbia Basin Electric Cooperative's (CBEC) 69-kilovolt (kV) Sand Hollow Tap line, which is connected to BPA's Boardman-Ione 69-kV line. Metering equipment and telemetry gear will be provided by BPA and will be installed at the applicant's collector substation and at BPA's

285

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-007736: Categorical Exclusion Determination Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy December 7, 2011 CX-007407: Categorical Exclusion Determination Advanced Floating Turbine CX(s) Applied: A9 Date: 12/07/2011 Location(s): Ohio Offices(s): Golden Field Office December 7, 2011 CX-007403: Categorical Exclusion Determination State of New Hampshire Energy Efficiency and Conservation Block Grant CX(s) Applied: B5.19 Date: 12/07/2011 Location(s): New Hampshire Offices(s): Golden Field Office December 7, 2011 CX-007401: Categorical Exclusion Determination

286

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

287

EIS-0427: EPA Notice of Availability of a Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Final Environmental EPA Notice of Availability of a Final Environmental Impact Statement EIS-0427: EPA Notice of Availability of a Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona EPA announces the availability of the Final Environmental Impact Statement for the Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona. The proposal is to develop a Wind Energy Generating Facility up to 500 Megawatts; (2) a 345 Kilovolt (kV) Electrical Transmission Tie-Line; and (3) a 345-kV Electrical Interconnection Switchyard, Coconino County, AZ. Review Period Ends: 07/09/2012. EIS-0427-EPANOA-FEIS-2012.pdf More Documents & Publications EIS-0414: EPA Notice of Availability of a Final Environmental Impact

288

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

289

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

290

EA-1636: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project The Bonneville Power Administration (BPA) has proposed replacing wood poles and associated structural components for two of BPA's existing transmission lines that generally share the same transmission line right-of-way - the 115-kilovolt (kV) Albany-Burnt Woods No. 1 transmission line and a portion of the 230-kV Santiam-Toledo No. 1 transmission line, both of which are located in Linn, Benton, and Lincoln Counties, Oregon. DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009) More Documents & Publications EA-1636: Mitigation Action Plan EA-1636: Finding of No Significant Impact

291

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Blue Ridge Microwave Site Upgrade Project Blue Ridge Microwave Site Upgrade Project Grand and Summit Counties, Colorado A. Bl'ief Description of Proposal: Western Area Power Administration (Western) proposes three maintenance actions within previously disturbed or developed areas to upgrade electric service and improve system reliability for the Blue Ridge Microwave Site (Site) in Grand County, Colorado. Western's proposed actions are: installation of a new electric service distribution arrangement at the Site, replacement of three defective single pole wooden structures on the Green Mountain-Blue Ridge (GM-BLR) 2.4-kilovolt (kV) distribution line, and removal of trees to improve Western's microwave line-of-sight path. * Western's GM-BLR 2.4-kV distribution line provides electric service to several communication.

292

CX-007143: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7143: Categorical Exclusion Determination 7143: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

293

CX-007131: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

294

CX-007156: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7156: Categorical Exclusion Determination 7156: Categorical Exclusion Determination CX-007156: Categorical Exclusion Determination New Waddell-Raceway-Westwing Structure Replacement CX(s) Applied: B4.6, B4.13 Date: 03/11/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to remove an existing three-pole turning structure (3/1 B) on the existing Raceway-Westwing 230-kilovolt (kV) Transmission Line, add a new replacement three-pole turning structure (also 3/1 B), and move equipment to a bay constructed by Arizona Public Service (APS) within the existing Raceway Substation in order to accommodate APS's new transmission line and substation equipment. APS intends to use the bay currently occupied by the Raceway-Westwing 230-kV Transmission Line for their new

295

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

296

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 6310 of 26,764 results. 01 - 6310 of 26,764 results. Download Semiannual Report to Congress April 1, 2008- September 30, 2008 Office of Inspector General Semiannual Report to Congress, DOE/IG-SAR-10-08 http://energy.gov/ig/downloads/semiannual-report-congress-april-1-2008-september-30-2008 Download Independent Activity Report, Los Alamos Site Office- April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment [HIAR-LANL-2011-11-18] http://energy.gov/hss/downloads/independent-activity-report-los-alamos-site-office-april-2012 Page EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV

297

CX-007147: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

147: Categorical Exclusion Determination 147: Categorical Exclusion Determination CX-007147: Categorical Exclusion Determination Flagstaff Substation Breaker Replacement & Control Cable Addition CX(s) Applied: B2.5 Date: 02/18/2011 Location(s): Coconino County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on removing four existing 345-kilovolt (kV) circuit breakers and installing four new 362-kV circuit breakers as well as adding new power and control cables in existing cable trenches to the control building. Excavation of the old trench to a minimum depth of 18 inches and 3 feet wide will be required. The disturbed ground will be use as backfill. The proposed action within the fenced area of the Flagstaff Substation is necessary to maintain the safety and reliability of the bulk electrical

298

CX-006586: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-006586: Categorical Exclusion Determination Integration of G0387 Energetics Solar Integration Project CX(s) Applied: B1.7, B4.6 Date: 09/01/2011 Location(s): Lake County, Oregon Office(s): Bonneville Power Administration Energetics, LCC has requested to integrate its 10 Megawatt Christmas Valley Solar (Project) generation resource into Bonneville Power Administration's (BPA) balancing authority. The new generation resource would interconnect into Midstate Electric Cooperative?s (MEC) 24.9-kilovolt (kV) distribution system at MEC?s Christmas Valley Substation which connects to MEC's Christmas Valley - Fort Rock 115-kV transmission line located in Lake County, Oregon. Project generation would subsequently be integrated onto

299

Microsoft Word - PearlSubExpansion_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz - TEP-CSB-2 Proposed Action: Pearl Substation 500-kilovolt (kV) #6 Bay Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, the addition of a new 500-kV Bay 6, and a one-half acre yard expansion in the southwest corner of the substation. The yard expansion area is within BPA property, consists of mowed grass, and is to facilitate a 40 square foot addition to the Pearl Control House

300

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Danger Tree Management on Green Mountain to Kremmling 69-kV Transmission Line Danger Tree Management on Green Mountain to Kremmling 69-kV Transmission Line Summit and Grand Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to survey and inspect all areas along the Green Mountain to Kremmling 69-kilovolt (k V) transmission line to conduct routine vegetation management inspection and danger tree removal. Trained crews will measure electrical clearance distances between the conductor and tree branches and cut down any trees that meet or exceed the allowable clearance distance. Any "danger" trees and vegetation that constitute an electrical hazard to the lines will be removed. Individual trees will be cut, lopped, and scattered within the existing right-of-way (ROW). Also proposed is routine maintenance to clear

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EA-1912: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

302

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

303

EIS-0474: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Notice of Intent to Prepare an Environmental Impact 4: Notice of Intent to Prepare an Environmental Impact Statement EIS-0474: Notice of Intent to Prepare an Environmental Impact Statement Proposed Southline Transmission Line Project in New Mexico and Arizona and Possible Land Use Plan Amendments The Department of the Interior's Bureau of Land Management and Department of Energy's Western Area Power Administration as joint lead agencies announce their intent to prepare an EIS to analyze the potential impacts of a proposed 345-kilovolt (kV) and 230-kV transmission line and address associated potential land use plan amendments. EIS-0474-NOI-2012.pdf More Documents & Publications 2013 Annual Planning Summary for the Western Area Power Administration Environmental Impact Statements and Environmental Assessments Status Chart

304

Microsoft Word - LaneElectricCooperativeIncBAASA-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 3, 2011 August 3, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum J. Diego Ochoa Transmission Account Executive - TSE-TPP-2 Proposed Action: Bonneville Power Administration (BPA) proposes to enter into a 30 year Balancing Authority Area Service Agreement (BAASA) with Lane Electric Cooperative, Inc. (LEC). LEC's King Estate Solar Generator Project (Project) interconnects directly with LEC's 34.5-kilovolt (kV) transmission system, which interconnects with BPA's 34.5-kV Eugene Substation. The Parties propose to enter into an operations and maintenance agreement to enable the Project to operate within BPA's balancing authority area. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Establishment

305

CX-007736: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36: Categorical Exclusion Determination 36: Categorical Exclusion Determination CX-007736: Categorical Exclusion Determination Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy Funding will support development of the Voltage-Gated Bipolar Transistor (VGBT), a novel silicon carbide (SiC) bipolar power switch that could drastically improve the efficiency, performance, and reliability of power converters used in high voltage, high energy systems, including utility scale inverter applications, solar/wind farm to grid power converters, solid-state power substations, and high voltage direct current transmission

306

EA-1617: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

307

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Goodnoe Hills and White Creek Wind Energy Goodnoe Hills and White Creek Wind Energy Projects The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 350 megawatts (MW) of power to be generated by the proposed Goodnoe Hills (150 MW) and White Creek (200 MW) Wind Energy Projects (Wind Projects) into the Federal Columbia River Transmission System (FCRTS). The Wind Projects will be interconnected at the proposed BPA Rock Creek substation. This substation will be constructed as a 500/230-kilovolt (kV) substation along BPA's Wautoma - John Day No.1 500-kV transmission line. These proposed facilities will be located in Klickitat County, Washington. DOE/EIS-0183, Record of Decision for the Electrical Interconnection of the Goodnoe Hills and White Creek Wind Energy Projects (October 2005)

308

CX-007141: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07141: Categorical Exclusion Determination 07141: Categorical Exclusion Determination CX-007141: Categorical Exclusion Determination Electrical District 4 - Electrical District 5 - Structure Replacement CX(s) Applied: B4.6 Date: 09/01/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace 9.2 miles of 115-kilovolt (kV) wood H-frame structures with 230-kV double-circuit steel monopoles and the existing conductor with a single circuit of 1272 kcmil ACSS. The second circuit will not be installed as a part of this project. The rebuild will include new hardware and insulators as well as one optical ground wire (OPGW) for the entire length of the line. Western will use existing access roads to bring personnel and equipment to the work area. The new lines will be designed to

309

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

310

EIS-0389: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0389: Final Environmental Impact Statement Trinity Public Utilities District Direct Interconnection Project The Western Area Power Administration (Western), part of the U.S. Department of Energy (DOE), prepared an environmental impact statement (EIS) on the construction and operation of proposed power transmission facilities in Trinity County, California. The U.S. Forest Service (USFS), the Bureau of Land Management (BLM), and the Bureau of Reclamation (Reclamation) participated in the preparation of the EIS, which addresses the proposed removal of about 5.3 mi of 12-kilovolt (kV) distribution line and the construction and operation of about 16 mi of new 60-kV transmission line, a tap structure and associated equipment, and a new switchyard. The

311

Microsoft Word - CX_Memo_FranklinSubstation.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amy Freel Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Franklin Substation Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electrical power substations and interconnection facilities Location: Pasco, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA proposes to make improvements to the BPA fee-owned Franklin Substation located in southeastern Washington in order to bring the substation into compliance with BPA's minimum voltage guidelines. A shunt capacitor bank would be installed to provide voltage support. Project activities would include moving a temporary mobile capacitor bank, removing transformers, extending a 115-kilovolt (kV) bus, installing a new 115-kV

312

CX-007143: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

43: Categorical Exclusion Determination 43: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

313

Microsoft Word - CX-Libby-Troy-AR-Revised-FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Dave Forward Road Designer - TELF-TPP-3 Proposed Action: Libby-Troy Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Lincoln County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade and improve access roads from Structures 23/3 through 24/6 on the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kilovolt (kV) transmission line. Background This project entails improving the several existing access roads along the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kV transmission line. Action locations for project access and road repair activities will include:

314

Microsoft Word - CX_Memo_Lex-Del  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 2013 0 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kV transmission line to Cowlitz County Public Utility District No.1 (Cowlitz PUD) in Cowlitz County, WA. BPA would sell the first four spans of the line, from BPA's Lexington Substation to approximately 2,000 feet northwest to structure 30/8,

315

EA-1503: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1503: Final Environmental Assessment EA-1503: Final Environmental Assessment EA-1503: Final Environmental Assessment Vermont Electric Power Company Proposed Northern Loop Project The Northern Loop Project proposed by VELCO involves upgrades in Vermont at three existing substation1 locations (St. Johnsbury, Irasburg and Highgate), additional line equipment at two tap2 points (Mosher's Tap in Newport and the St. Albans Tap) and an upgrade of an existing 6.47-mile, 48-kilovolt (kV) transmission line, located between VELCO's Irasburg Substation iiand Mosher's Tap, to accommodate a new 115-kV transmission circuit. Environmental Assessment, Vermont Electric Power Company Proposed Northern Loop Project, DOE/EA-1503, 2004 More Documents & Publications EA-1503: Finding of No Significant Impact CX-000605: Categorical Exclusion Determination

316

Microsoft Word - PGE LURR - CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Monica Stafflund Realty Specialist - TERR-Chemawa Proposed Action: Portland General Electric (PGE) 13-kilovolt (kV) Overhead Electrical Line Land Use Review Request (LURR) Budget Information: 00184006, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way. Location: Township 7 south, Range 3 West, Section 17, Polk County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow PGE a 1-mile long, 20-foot wide easement on BPA fee-owned property for the purpose of constructing a new 13-kV power line parallel to BPA's existing Chemawa-Salem transmission line in Polk County, Oregon. Construction disturbance

317

Microsoft Word - CX_FINAL_Sale_of_Eight_Spans_Tanner_Tap_115-kV_Transmission_Line_to_PSE_6-5-2012_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan B. Kendall Project Manager -TERR-3 Proposed Action: Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24. Property Transfer Location: King County, Washington; Township 24 North, Range 7 East, Section 36, Willamette Meridian Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell to Puget Sound Energy (PSE) the first eight spans of its 115-kV Tanner Tap to Snoqualmie-Lake Tradition #1 transmission line (Tanner Tap-8). Tanner Tap-8, built in 2002, is owned and operated by BPA and located within a 150 feet

318

CX-007161: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61: Categorical Exclusion Determination 61: Categorical Exclusion Determination CX-007161: Categorical Exclusion Determination Pinnacle Peak Substation Conductor & Circuit Breaker Replacement CX(s) Applied: B4.6 Date: 12/03/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on replacing 230-kilovolt (kV) conductor in four bays and one 230-kV power circuit breaker voltage transformer within the fenced area of the Pinnacle Peak Substation, This will also consist of rerouting existing conduit in a 20 foot trench going 24 inches in depth. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the

319

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Willow Creek - Willow Creek - Granby Tap 2.4-kV Distribution Line Structure 0/3A Pole Replacement Project Grand County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to replace Structure No. O/3A on its Willow Creek - Granby Tap 2.4 kilovolt (kV) distribution line in Grand County, Colorado. This undertaking will involve the replacement of poles of the existing wooden H-frame structure, and construction of two level landings. An existing access road will be used to allow safe passage of rubber-tired auger truck and bucket truck to Structure O/3A. The pole replacement process would involve moderate to severe ground disturbance; the rejected pole is lifted out of the ground using a hydraulic jack and a rubber-tired truck-mounted auger is

320

CX-000605: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

605: Categorical Exclusion Determination 605: Categorical Exclusion Determination CX-000605: Categorical Exclusion Determination Naselle Tap Modification Loop into Driscoll Substation CX(s) Applied: B4.6, B4.11 Date: 01/27/2010 Location(s): Clatsop County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to expand the existing Driscoll Substation to accommodate a 115-kilovolt (kV) ring bus and rebuild 2.5 miles of the Allston-Astoria Number 1 (No.1) line to double circuit to facilitate looping the Allston-Astoria No.1 and Naselle Tap lines into the Driscoll Substation in Clatsop County, Oregon. Currently the Allston-Astoria No.1 and Naselle Tap 115-kV lines form a three-terminal line with eight taps. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000605.pdf More Documents & Publications

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - Celilo_CX_Memo_04-12-2013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emmanuel Jaramillo Emmanuel Jaramillo Project Manager, TEP-TPP-1 Proposed Action: Celilo Fiber System Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber Optic Cable Location: East of The Dalles, Wasco County, Oregon in T 1 N, R 14 E, Sec 6 and T 2 North, R 14 East, Sec 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install fiber optic cable, and associated vault between three substations (Big Eddy 230-kilovolt (kV) Substation, Big Eddy 500-kV Substation, and Celilo Substation) that are located in the same general vicinity on BPA owned property. See attached map. The fiber optic cable would be about 13,000 feet long. The fiber optic cable would be strung on approximately 25 new 40-foot tall wood poles that would be

322

Microsoft Word - Midway-Benton_FONSI_Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Midway-Benton No. 1 Transmission Line Rebuild Project Midway-Benton No. 1 Transmission Line Rebuild Project U.S. Department of Energy Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-1912 Summary Bonneville Power Administration (BPA), in coordination with the U.S. Department of Energy- Richland (DOE-RL), announces its environmental findings on the Midway-Benton No. 1 Transmission Line Rebuild Project (Proposed Action). The Proposed Action would replace the approximately 28.2-mile-long, 115-kilovolt (kV) Midway-Benton No. 1 transmission line and approximately 11 miles of the 115-kV Benton-Othello No. 1 transmission line between the existing Midway and Benton Substations. All of the Proposed Action would be located on the Hanford Site in Benton County, Washington.

323

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

324

Functional design criteria exploratory shaft power line and substation Project B-417  

SciTech Connect

This project will provide a 13.8-KV, 3-phase electrical power line from substation B-251 to the ES site. The power line will be sized to carry the 6000 KVA power required to meet the construction and operations power requirements of the facility. The line will originate at an existing circuit breaker at the 13.8 KV switch gear at substation B-251 and will terminate at fused cutouts at the ES site. Wood poles will be used for the aerial support of the {approximately}4.7 mile transmission line. Joint use of the line by project B-316 is being considered. The substation will provide transformation from 13.8 KV to 2.4 KV, transformer mounting, grounding grid for the entire substation, the substation fence, and connection between the primary side of the transformer and the 13.8 KV electrical line (last pole) provided by Part 1. Switching stations, protective devices, and metering, which are normally part of a substation, will be provided by the ES Project, B-314. 10 refs.

Schroeder, B.K.

1981-12-01T23:59:59.000Z

325

Conceptual Design Report, Exploratory Shaft Power Line and Substation, Project B-417  

SciTech Connect

This project will provide a 13.8-KV, 3-phase electrical power line from substation B-251 to the ES site. The power line will be sized to carry the 6000 KVA power required to meet the construction and operations power requirements of the facility. The line will originate at an existing circuit breaker at the 13.8 KV switch gear at substation B-251 and will terminate at fused cutouts at the ES site. Wood poles will be used for the aerial support of the {approximately}4.7 mi. transmission line. Joint use of the line by project B-316 is being considered. This part will provide transformation from 13.8 KV to 2.4 KV, transformer mounting, grounding grid for the entire substation, the substation fence, and connection between the primary side of the transformer and the 13.8 KV electrical line (last pole) provided by Part I. Switching stations, protective devices, and metering, which are normally part of a substation, will be provided by the ES project, B-314. This report includes drawings, cost estimates and schedules.

Schroeder, B.K. (Kaiser Engineers Hanford Co., Richland, WA (USA))

1982-03-01T23:59:59.000Z

326

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

327

Record of Decision and Floodplain Statement for the Interconnection of the Southpoint Power Plant with the Wester Area Power Administration's Parker-Davis No. 1 and No. 1 kilovolt Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44 44 Federal Register / Vol. 64, No. 62 / Thursday, April 1, 1999 / Notices obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified or filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. Linwood A. Watson, Jr., Acting Secretary, [FR Doc. 99-7991 Filed 3-31-99; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Surrender of Exemption and Soliciting Comments, Motions To Intervene, and Protests March 26, 1999. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Surrender of Exemption.

328

Data:6ddea1d8-5d03-4a86-ac9d-3e8729ed8103 | Open Energy Information  

Open Energy Info (EERE)

ddea1d8-5d03-4a86-ac9d-3e8729ed8103 ddea1d8-5d03-4a86-ac9d-3e8729ed8103 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2011/07/01 End date if known: Rate name: SCHEDULE CQ GENERAL SERVICE - 2kV to 15kV Sector: Industrial Description: AVAILABILITY Available only at accounts served as of October 1, 1993 for single phase and three phase Service at standard Cooperative voltage. The standard voltage available depends upon the location, character and size of the consumer's load. This information can be furnished at any of the Cooperative's offices. Service shall not be available for Standby or Maintenance Service such as that required for alternative generation facilities. Available to all Member/Consumers of this class within the new service territory acquired from Potomac Edison Company. Voltage Discount (kw) (a)2kv to 15 kv @$0.25 per kw RKVA Charge: (a)Reactive kilovolt-ampere charge is applied to the Consumer's rkva capacity requirement in excess of 25% of the Consumer's kilowatt capacity. Billing rkva @$0.40 per rkva

329

A unique power supply for the PEP II klystron at SLAC  

SciTech Connect

Each of the eight 1.2 MW RF klystrons for the PEP-II storage rings require a 2.5 MVA DC power supply of 83 Kv at 23 amps. The design for the supply was base on three factors, low cost, small size to fit existing substation pads, and good protection against damage to the klystron including klystron gun arcs. The supply uses a 12 pulse 12.5 KV primary thyristor star point controller with primary filter inductor to provide rapid voltage control, good voltage regulation, and fast turn off during klystron tube faults. The supply also uses a unique secondary rectifier, filter capacitor configuration to minimize the energy available under a klystron fault. The voltage control is from 0--90 KV with a regulation of < 0.1% and voltage ripple of < 1% P-P, (< 0.2% RMS) above 60 KV. The supply utilizes a thyristor crowbar, which under a klystron tube arc limits the energy in the klystron arc to < 5 joules. If the thyristor crowbar is disabled the energy supplied is < 40 joules into the arc. The size of the supply was reduced small enough to fit the existing PEP transformer yard pads. The cost of the power supply was < $140 per KVA.

Cassel, R.; Nguyen, M.N.

1997-07-01T23:59:59.000Z

330

Data:Fdae0f06-57d3-4f1a-aa6e-18f04ffbe08a | Open Energy Information  

Open Energy Info (EERE)

Fdae0f06-57d3-4f1a-aa6e-18f04ffbe08a Fdae0f06-57d3-4f1a-aa6e-18f04ffbe08a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2001/11/01 End date if known: Rate name: LARGE POWER SERVICE - Schedule LP-3 - Primary Sector: Industrial Description: This schedule applies to all large power customers where actual demand has exceeded one thousand kilowatts three times or more within the preceding twelve months or where installed capacity serving a customer at a single, contiguous site is 2500 kilovolt-amperes (KVA) or greater. Heavy Load Period Demand Charges The maximum billing occurring during the hours of 7 a.m. through 12 noon, Monday through Saturday, after adjustment for power factor.

331

Data:46162d74-c1d2-4c45-9628-837a8408afd1 | Open Energy Information  

Open Energy Info (EERE)

d74-c1d2-4c45-9628-837a8408afd1 d74-c1d2-4c45-9628-837a8408afd1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2001/11/01 End date if known: Rate name: LARGE POWER SERVICE - Schedule LP-3 - Secondary Sector: Industrial Description: This schedule applies to all large power customers where actual demand has exceeded one thousand kilowatts three times or more within the preceding twelve months or where installed capacity serving a customer at a single, contiguous site is 2500 kilovolt-amperes (KVA) or greater. Heavy Load Period Demand Charges: The maximum billing occurring during the hours of 7 a.m. through 12 noon, Monday through Saturday, after adjustment for power factor.

332

CX-008789: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-008789: Categorical Exclusion Determination Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles).

333

Data:50e54203-3562-49df-9954-b9078d1e97d9 | Open Energy Information  

Open Energy Info (EERE)

03-3562-49df-9954-b9078d1e97d9 03-3562-49df-9954-b9078d1e97d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2011/07/01 End date if known: Rate name: SCHEDULE GQ GENERAL SERVICE - 2kV to 15kV voltage Sector: Industrial Description: AVAILABILITY Available for single phase and three phase Service at standard Cooperative voltage. The standard voltage available depends upon the location, character and size of the consumer's load. This information can be furnished at any of the Cooperative's offices. Service shall not be available for Standby or Maintenance Service such as that required for alternative generation facilities. Available to all Member/Consumers of this class within the new service territory acquired from Potomac Edison Company. Demand Charge(distribution): Minimum kw @$0.99 per kw All kw in excess of 7.5 measured as set forth under "Determination of Capacity" @$0.77 per kw Demand Charge(Supply) Minimum kw @$1.85 per kw All kw in excess of 7.5 measured as set forth under "Determination of Capacity" @$1.44 per kw Voltage Discount (kw) (a)2kv to 15 kv @$0.25 per kw (b)Over 15 kv @$0.50 per kw RKVA Charge: (a)Reactive kilovolt-ampere charge is applied to the Consumer's rkva capacity requirement in excess of 25% of the Consumer's kilowatt capacity. Billing rkva @$0.40 per rkva

334

Notices  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

72 Federal Register 72 Federal Register / Vol. 76, No. 112 / Friday, June 10, 2011 / Notices module would contain 2 generating units with a total combined capacity of 2.2 megawatts (MW); (5) a new switchyard containing a transformer; (6) a proposed 300-feet-long, 13-kilovolt (kV) transmission line to an existing distribution line. The proposed project would have an average annual generation of 10.6 megawatt-hours (MWh), which would be sold to a local utility. Applicant Contact: Mr. Wayne Krouse, Hydro Green Energy LLC, 5090 Richmond Avenue #390, Houston, TX 77056; phone (877) 556-6566 x709. FERC Contact: Michael Spencer, (202) 502-6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60

335

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Located in Wyoming and Nebraska A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to replace the wood switch mounting structures and I 15-kilovolt (kV) line discOimect switches with new switches and steel box mounting structures at the Guernsey Rural, Worland, Refinery, Box Butte, and Morrill County Taps located in Platte, Washakie, and Natrona Counties, Wyoming, and Box Butte and Morrill Counties, Nebraska. All line disconnect switches are mounted on four pole wood structures with similar configurations. Many of the switches and wood structures were installed in the early 1950's, are original, obsolete, and difficult to find replacement parts. The mounting wood structures are deteriorating and have

336

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Located in Wyoming and Nebraska A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to replace the wood switch mounting structures and 115-kilovolt (kV) line discmmect switches with new switches and steel box mounting structures at the Guernsey Rural, Worland, Refinery, Box Butte, and Morrill County Taps located in Platte, Washakie, and Natrona Counties, Wyoming, and Box Butte and Morrill Counties, Nebraska. All line disconnect switches are mounted on four pole wood structures with similar configurations. Many of the switches and wood structures were installed in the early 1950's, are original, obsolete, and difficult to find replacement parts. The mounting wood structures are deteriorating and have

337

Microsoft Word - CX Memo LaPineShunt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Michael Gilchrist Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: LaPine Substation Shunt Reactor Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: LaPine, Deschutes County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to add equipment at its LaPine Substation in Deschutes County, Oregon to improve regional transmission voltage stability and increase transmission network efficiency. The site is located on land managed by the U.S. Forest Service. BPA would install a 230-kilovolt (kV) shunt reactor bank, bus bar and associated electrical work in the northeast corner of the substation tract. The substation fenceline and groundmat would be

338

EA-1635: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1635: Finding of No Significant Impact Williston to Tioga Transmission Line Project, North Dakota Basin Electric Power Cooperative (BEPC) proposes to construct and operate a new 230-kilovolt (kV) transmission line to meet existing and future electric power requirements in northwestern North Dakota, and to interconnect this new transmission line to the Western Area Power Administration's (Western) transmission system. The EA identified no potentially significant impacts to environmental resources resulting from either Western's Federal action or Basin Electric's Proposed Project. Finding of No Significant Impact for Williston to Tioga Transmission Line Project Pre-Approval Review, DOE/EA-1635 (May 2010) More Documents & Publications

339

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CrystalllS-kV Transmission Line Routine Maintenance of CrystalllS-kV Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-ways (ROW) along the Curecanti-Crystal (CCI-CRY) liS-kilovolt (kV) transmission line to safely access structures 112,1/6,4/1, 6IS-6, 7/1-9, and 8/1-4 (approximately 3 miles). The project is located on private and u.s. Bureau of Land Management (BLM) lands in Montrose County, Colorado. Routine maintenance actions proposed for CCI-CRY IIS-kV transmission line include the following: I) Access road grading and improvements. A rubber-tired motor grader andlor a track dozer would

340

Microsoft Word - CX-Wautoma-OstranderUpgradeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Nathan Mullen Civil Engineer - TELP-TPP-3 Proposed Action: Wautoma-Ostrander Surface Impairment Removal PP&A Project No.: 2361 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Location: Project activities would take place in Klickitat County, Washington, on the Yakama Reservation, Township 6N, Range 17E, Section 23. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to remove soil between structure 58/3 and 58/4 on the 500-kilovolt (kV) Wautoma-Ostrander No. 1 transmission line. Presently, the distance from the conductor to the ground surface does not have adequate clearance for operation at 100°C.

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EA-1366: Preliminary Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

66: Preliminary Environmental Assessment 66: Preliminary Environmental Assessment EA-1366: Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate overloading of the existing line from Santiam Substation to the line's connection to Bethel Substation by having one new line supply Bethel Substation and the other new line supply Chemawa Substation.

342

Microsoft Word - CX-NorthBonneville75-4ReplacementWenatcheeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR/Pasco KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: North Bonneville-Midway No. 1 Tower 75/4 Replacement PP&A Project No.: 2410 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: The work associated with this project will take place in the areas shown in the table below: Transmission Line/ROW Structure # Township Range Section County, State North Bonneville- Midway #1 75/4 6N 17E 14, 23 Klickitat, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and

343

CX-009705: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

705: Categorical Exclusion Determination 705: Categorical Exclusion Determination CX-009705: Categorical Exclusion Determination Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to increase the physical distance that separates each phase of the 500/230-kiloVolt transformer banks at BPA's Lane Substation. The reason for the increased distance is to minimize the effects of a transformer fire or explosion as outlined in the Institute of Electrical and Electronic Engineers, Inc. guidelines for substation fire suppression. CX-009705.pdf More Documents & Publications CX-008705: Categorical Exclusion Determination CX-009708: Categorical Exclusion Determination

344

DOEEA-(0962) BLM EA # CA-016-93-140 BLM R/W S E W NO. CA 31330  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(0962) (0962) BLM EA # CA-016-93-140 BLM R/W S E W NO. CA 31330 JOINT ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION AND ROUTINE OPERATION OF A 12-KILOVOLT (KV) OVERHEAD POWERLINE RIGHT-OF-WAY, AND FORMAL AUTHORIZATION FOR A 10-INCH AND 8-INCH FRESH WATER PIPELINE RIGHT-OF-WAY, NAVAL PETROLEUM RESERVE NO. 1, KERN COUNTY, CALFORNIA OCTOBER 1994 U.S. DEPARTMENT OF ENERGY NAVAL PETROLEUM RESERVES IN CALIFORNIA U. S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT CALIENTE RESOURCE AREA . DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for

345

EIS-0421: Big Eddy-Knight Transmission Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21: Big Eddy-Knight Transmission Line 21: Big Eddy-Knight Transmission Line EIS-0421: Big Eddy-Knight Transmission Line Overview BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line would extend generally northeast from BPA's existing Big Eddy Substation in The Dalles, Oregon, to a new substation (Knight Substation) proposed to be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The proposed Big Eddy Knight Transmission Project is needed to increase transmission capacity to respond to requests for transmission service in this area. Public Comment Opportunities No public comment opportunities available at this time.

346

EA-1644: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain

347

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

348

Microsoft Word - NEPA_CX_Acquisition_of_OTEC_Disconnect_Switch_LaGrand_Substation_05-08-2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kelly Miller Kelly Miller Project Manager - TG-DITT-2 Proposed Action: BPA Acquisition of OTEC Disconnect Switch at the BPA LaGrande Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24 Property Transfer Location: BPA LaGrande Substation, in the City of LaGrande, Union County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to purchase the 230-kilovolt (kV) main bus disconnect switch (MB A-270) that is currently installed and operating within the BPA LaGrande Substation. The disconnect switch is owned by the Oregon Trail Electric Cooperative (OTEC). On October 7, 2011, the manager of engineering for OTEC requested that BPA purchase the disconnect switch. The disconnect switch is the only piece of equipment within

349

EA-1855: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

350

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

351

Microsoft Word - CX-Drummond-MacksInn-WoodPoleReplacementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2012 29, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Swan Valley-Teton 115-kilovolt (kV) transmission line rights-of-way. PP&A Project Number: 2486 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 3N 44E 28 Teton Swan Valley - Teton 10/6 Forest Forest Service 14S 5E 19 Fremont

352

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 28660 of 28,904 results. 51 - 28660 of 28,904 results. Download EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve- October 17, 2012 EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve, approved at the October 15-16, 2012 EAC Meeting. http://energy.gov/oe/downloads/eac-recommendations-doe-action-regarding-strategic-portable-generation-reserve-october Download CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008716-categorical-exclusion-determination

353

Microsoft Word - Soos_Creek_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timothy Wicks Timothy Wicks Realty Specialist - TERR-COVINGTON Proposed Action: Soos Creek Water & Sewer District Land Use Review Request Case No. 20120040 Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 - Multiple use of powerline rights-of-way Location: Covington, King County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request from Soos Creek Water & Sewer District (District) to construct a new sewer line that would cross under an existing road on BPA fee-owned property near structures 1/2 and 1/3 of the Covington-Maple Valley No. 2 230-kilovolt (kV) transmission line. The proposed sewer line

354

DOE/EIS-0183: Record of Decision for the Electrical Interconnection of the Shepherds Flat Wind Energy Project (07/18/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project July 2008 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind

355

EIS-0379: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Record of Decision 79: Record of Decision EIS-0379: Record of Decision This Record of Decision was issued for Environmental Impact Statement (EIS-0379) that assessed the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-ROD-2008 More Documents & Publications EIS-0379 - Final Environmental Impact Statement

356

Microsoft Word - CX-HotSpringsGravityDrainsFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Nicholson Project Manager - TELF-TPP-3 Proposed Action: Install gravity drain system and oil stop valves, reshape west side perimeter ditch and flush out yard drains at the Hot Springs Substation. PP&A Project No.: 2383 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6, Additions and modifications to transmission facilities Location: T21N, R24W, S14, PM, Sanders County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Using directional drilling equipment, approximately 3,644 linear feet of gravity drain line will be installed under the existing electrical manhole system located in the Hot Springs Substation 230 and 500 Kilovolt (kV) yards. Each manhole

357

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

358

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 17760 of 26,764 results. 51 - 17760 of 26,764 results. Page EIS-0486: Plains & Eastern Clean Line Transmission Project This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). http://energy.gov/nepa/eis-0486-plains-eastern-clean-line-transmission-project

359

CX-006302: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

302: Categorical Exclusion Determination 302: Categorical Exclusion Determination CX-006302: Categorical Exclusion Determination Colville-Republic Rebuild Project CX(s) Applied: B1.3, B4.6 Date: 07/21/2011 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures along approximately 13.5 miles of the Colville-Republic No. 1 115 kilovolt (kV) transmission line (structures 1/1-14/5). BPA would replace wood pole structures in kind and at their currently existing locations. In addition to pole replacement, BPA would replace structure crossarms, insulators, dampers and conductor. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006302.pdf More Documents & Publications CX-010439: Categorical Exclusion Determination

360

Categorical Exclusion Determinations: Wyoming | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wyoming Wyoming Categorical Exclusion Determinations: Wyoming Location Categorical Exclusion Determinations issued for actions in Wyoming. DOCUMENTS AVAILABLE FOR DOWNLOAD July 26, 2013 CX-010688: Categorical Exclusion Determination Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC July 26, 2013 CX-010687: Categorical Exclusion Determination Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC July 2, 2013 CX-010686: Categorical Exclusion Determination Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region June 28, 2013

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

362

Microsoft Word - BingenSwitchDisposition_CXMemo.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Bingen Substation Sectionalizing Switches Disposition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Klickitat County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell two sectionalizing switches owned by BPA but located on PacifiCorp's Condit-Powerdale 69-kilovolt (kV) line in and adjacent to the Bingen Substation. BPA sold the Bingen substation to Klickitat County PUD in 1997 but retained ownership rights to inspect, maintain, repair, and replace its remaining revenue meters,

363

EA-1731: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115-kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is located in Walla Walla and Columbia counties in Washington, extending from the city of Walla Walla to near the town of Dayton. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Final Environmental Assessment

364

EIS-0443: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Record of Decision 3: Record of Decision EIS-0443: Record of Decision Project Financing for Southwest Intertie Project - South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

365

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14: Draft Environmental Impact Statement 14: Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

366

EIS-0317: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: EPA Notice of Availability of the Draft Environmental 7: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement Kangley-Echo Lake Transmission Line Project Notice of availability of the Kangley-Echo Lake Transmission Line Project construction of a new 500 kilovolt (kV) transmission line draft environmental impact statement supplement with updated information on the reevaluating alternative not analyzed, COE Section 10 and Permits, King County, WA. Environmental Protection Agency Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement, DOE/EIS-0317 (January 2003) (68 FR 1458) More Documents & Publications EIS-0386: EPA Notice of Availability of the Programmatic Final

367

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343) (08/20/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COB Energy Facility COB Energy Facility DECISION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the COB Energy Facility with the Federal Columbia River Transmission System (FCRTS), as proposed in the COB Energy Facility Final Environmental Impact Statement (FEIS) (DOE/EIS-0343, June 2004). Proposed by Peoples Energy Resources Company (PERC), the COB Energy Facility involves constructing and operating a new 1,160- megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 50.6-acre site near Bonanza in Klamath County, Oregon, and a 7.2-mile-long 500-kilovolt (kV) transmission line south to BPA's Captain Jack Substation. A Generation Interconnection Agreement with PERC would provide for interconnection of the COB Energy Facility with the FCRTS and

368

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

369

CX-007750: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

370

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

371

Microsoft Word - City_of_Sherwood_LURR_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: City of Sherwood Sewer Line Replacement Land Use Review Request Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 Multiple use of powerline rights-of-way Location: Sherwood, Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request (LURR) submitted by the city of Sherwood (city) to replace a portion of its proposed sewer line within existing BPA fee-owned right-of-way (ROW) between structure 19/11 of BPA's Keeler-Oregon City No. 2 115-kilovolt (kV) transmission line and SW Tualatin-Sherwood Road. The city would replace

372

N:\WPWIN60\ORDERS\PP-118.ORD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HILL COUNTY ELECTRIC COOPERATIVE, INC. HILL COUNTY ELECTRIC COOPERATIVE, INC. ORDER NO. PP-118 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order 10485, as amended by Executive Order 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated July 11, 1996, as amended on July 25, 1996, Hill County Electric Cooperative, Inc. (Hill County) applied to FE for a Presidential permit to construct a new 69- kilovolt (kV) electric transmission facility between the United States and Canada from a point in

373

EA-1644: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment Kildeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper Missouri Generation and Transmission Electric Cooperative, Inc. (UMGT), has applied to the U.S. Department of Energy (DOE) Western Area Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission line which would extend about 13 miles northward from Western's Killdeer Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. The Pre-Decisional Environmental Assessment was issued, without changes, as the Final Environmental Assessment.

374

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0183: Record of Decision EIS-0183: Record of Decision EIS-0183: Record of Decision Electrical Interconnection of the Shepherds Flat Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard

375

Categorical Exclusion Determinations: Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 8, 2013 May 8, 2013 CX-010266: Categorical Exclusion Determination South Table Mountain Energy Systems Integration Facility Hydrogen Fueling Station CX(s) Applied: B1.15 Date: 05/08/2013 Location(s): Colorado Offices(s): Golden Field Office April 26, 2013 CX-010258: Categorical Exclusion Determination Bangladesh Meteorological Instrumentation Installation CX(s) Applied: A9 Date: 04/26/2013 Location(s): Colorado Offices(s): Golden Field Office April 26, 2013 CX-010111: Categorical Exclusion Determination Animas River Substation Site Drainage Remediation CX(s) Applied: B4.6 Date: 04/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region April 26, 2013 CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and

376

Microsoft Word - L0295-StJohnsTap-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joyce Vaughn Project Engineering - TELP-TPP-3 Proposed Action: L0295 - St. Johns-St. Helens #1 Interconnection Project Budget Information: Work Order #004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Columbia County, Oregon (T4N, R1W, Section 7) Proposed by: Bonneville Power Administration (BPA) and Columbia River PUD (CRPUD) Description of the Proposed Action: BPA proposes to install a new tap and associated disconnect structures on BPA's St. Johns-St. Helens #1 115-kilovolt (kV) transmission line to

377

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2010 25, 2010 CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination

378

EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Notice of Intent to Prepare an Environmental Impact 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement South Oregon Coast Reinforcement Project, Coos Bay, North Bend, Oregon Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area. This plant would require a peak load of 150 megawatts (MW) and an instantaneous peak of 225 MW. The existing transmission system to the area does not have the capacity to serve this potential load and other anticipated load growth on the south coast of Oregon. This project will

379

EIS-0374: EPA Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74: EPA Notice of Availability of the Final Environmental 74: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon Final EIS, BPA, OR, Klondike III Wind Project (300 megawatts {MW}) and Biglow Canyon Wind Farm (400 megawatts {MW}) Integration Project, Construction and Operation of a Double-Circuit 230- Kilovolt (kV) Transmission, Sherman County, OR. DOE/EIS-0374, Environmental Protection Agency, Notice of Availability of the Final Environmental Impact Statement for Department of Energy, Bonneville Power Administration, Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon, 71 FR 55463 (September 2006) More Documents & Publications

380

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2012 May 21, 2012 CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests CX(s) Applied: B3.10, B3.11 Date: 05/18/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 17, 2012 CX-008717: Categorical Exclusion Determination Relocation of Wood Poles on Centralia B Street No. 1 for Proposed Centralia City Light May Street Substation CX(s) Applied: B4.6 Date: 05/17/2012

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Microsoft Word - Creston-Bell MAP_final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Mitigation Action Plan DOE/EA-4406 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 53.8-mile-long 115-kilovolt (kV) transmission line from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of Spokane, Washington. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental

382

Microsoft Word - CX_Memo_Fairmount.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Fairmount Substation Equipment Acquisition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers. Location: Jefferson County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to a request by Jefferson County Public Utility District No.1 (Jefferson PUD), BPA is proposing to take ownership of equipment owned by Jefferson PUD within BPA's existing Fairmount Substation in Jefferson County, WA. Jefferson PUD, a Network Integration Customer of BPA, would sell its 115-kilovolt (kV) line terminal in Bay

383

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Powet· Administration Powet· Administration Danger Tree Management on Green Mountain to Kremmling 69-kV Transmission Line Summit and Grand Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to survey and inspect all areas along the Green Mountain to Kremmling 69-kilovolt (k V) transmission line to conduct routine vegetation management inspection and danger tree removal. Trained crews will measure electrical clearance distances between the conductor a:nd tree branches and cut down any trees that meet or exceed the allowable clearance distance. Any "danger" trees and vegetation that constitute an electrical hazard to the lines will be removed. Individual trees will be cut, lopped, and scattered within the existing right-of-way (ROW). Also proposed is routine maintenance to clear

384

Microsoft Word - Horse_Butte_G0374_Env_ Clearance_Doc.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Cattle Creek Substation (formerly known as Horse Butte Substation) Budget Information: Work Order # 00283812 (TC AUO) and 00283765 (TC) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 "Construction or electric power substations (including switching stations and support facilities) with power delivery at 230-kilovolt (kV) or below, or modification (other than voltage increases) of existing substations and support facilities, ..." Location: Bonneville County, ID near Idaho Falls. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Utah Associated Municipal Power

385

Microsoft Word - CX_Memo_TVWD.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2012 31, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kilovolt (kV) transmission line corridor in the City of Beaverton,

386

EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Notice of Intent to Prepare an Environmental Impact 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement South Oregon Coast Reinforcement Project, Coos Bay, North Bend, Oregon Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area. This plant would require a peak load of 150 megawatts (MW) and an instantaneous peak of 225 MW. The existing transmission system to the area does not have the capacity to serve this potential load and other anticipated load growth on the south coast of Oregon. This project will

387

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

891 - 19900 of 28,905 results. 891 - 19900 of 28,905 results. Download CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008890-categorical-exclusion-determination Download CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008891-categorical-exclusion-determination Download CX-009199: Categorical Exclusion Determination Access Road Improvement For the Kalispell-Kerr Number 1, 115-kilovolt (kV)

388

CX-005380: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-005380: Categorical Exclusion Determination Pearl Substation Fiber Project CX(s) Applied: B1.7, B4.7 Date: 02/25/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to allow Portland General Electric (PGE) to install fiber optic cable that connects PGE?s distribution network to the BPA-owned Pearl Substation located within Clackamas County, Oregon. This project would allow the use of line differential relaying on PGE?s McLoughlin-Sherwood-Pearl 230-kilovolt (kV) line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005380.pdf More Documents & Publications CX-006313: Categorical Exclusion Determination CX-006262: Categorical Exclusion Determination

389

EIS-0231: Navajo Transmission Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

390

Microsoft Word - CX-Sacajawea-SunHarborCascadeSteelTapPropertyTransferFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Acquisition and Disposition of Property Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.24, Property transfers. Location: Walla Walla County, WA; Yamhill County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to dispose of one property and acquire another property in its service territory: Sacajawea-Sun Harbor: BPA proposes to dispose of 2.02 miles of its Sacajawea-Sun Harbor 115-kilovolt (kV) transmission line, associated easement rights, and its Sun Harbor Substation to the Columbia Rural Electric Association (CREA). The transmission line and substation are

391

EA-1467: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact Bonneville-Alcoa Access Road Project Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. Bonneville-Alcoa Access Road Project More Documents & Publications EA-1366: Preliminary Environmental Assessment EA-1366: Finding of No Significant Impact

392

CX-006290: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-006290: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/25/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace all of the aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115 kilovolt (kV) transmission line. Due to the age of the wood poles, the work is necessary to improve the safety, operation, and reliability of the transmission line. All wooden pole structures, hardware, and support structures will be replaced in the original location. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006290.pdf More Documents & Publications

393

CX-005010: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-005010: Categorical Exclusion Determination Ostrander Substation Addition CX(s) Applied: B4.11 Date: 01/06/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to expand its existing Ostrander Substation near Barton, Oregon by approximately 4 acres. The expansion would accommodate three new 230/500 kilovolt (kV) transformers, with provisions for a spare transformer. The expansion of the substation is needed to replace aging infrastructure at the nearby McLaughlin Substation. BPA is proposing to replace the transformers at the Ostrander substation and lease the McLaughlin Substation. The proximity of the west side of the Ostrander Substation would allow connection of the new transformers and

394

CX-006817: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17: Categorical Exclusion Determination 17: Categorical Exclusion Determination CX-006817: Categorical Exclusion Determination McNary-Ross No. 1 Upgrade Project, Surface Impairment Removal CX(s) Applied: B1.3 Date: 09/20/2011 Location(s): Klickitat and Clark Counties, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to address five surface impairments that were identified on the 345-kilovolt (kV) McNary-Ross No. 1 transmission line. At these locations, the distance from the conductor to the ground surface does not have adequate clearance for operation at 70?C. BPA proposes to re-shape the existing ground surface in these areas to achieve adequate clearance. The proposed work would allow BPA?s McNary-Ross No. 1 transmission line to meet current National Electrical Safety Code

395

CX-005848: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

848: Categorical Exclusion Determination 848: Categorical Exclusion Determination CX-005848: Categorical Exclusion Determination Midway Area Fiber Project CX(s) Applied: B4.7 Date: 05/02/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install about 1.5 miles of aerial fiber optic cable on the existing Midway-Rocky Ford No.1 230-kilovolt (kV) transmission line. The new fiber optic cable would replace the overhead groundwire (OHGW) on the Midway-Rocky Ford No.1 transmission towers. The fiber would span from a tower in the Midway Substation yard to tower 1/1 (first mile/first tower) on the Midway-Rocky Ford line, where a new fiber splice enclosure box would be installed on the tower. The fiber would then continue to replace the existing OHGW and span

396

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

397

Record of Decision for the Electrical Interconnection of the Plymouth Generating Facility (DOE/EIS-0345)(10/14/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Electrical Interconnection of the Plymouth Generating Facility October 2003 THE DECISION The Bonneville Power Administration (BPA) has decided to implement the proposed action identified in the Plymouth Generating Facility (PGF) Final Environmental Impact Statement (FEIS) (DOE/EIS-0345, June 2003). The PGF, which has been proposed by Plymouth Energy, LLC (Plymouth Energy), involves construction and operation of a 307-megawatt (MW) natural gas-fired, combined-cycle power generation facility on a 44.5-acre site 2 miles west of Plymouth in Benton County, Washington. Under the proposed action, BPA will offer contract terms for interconnection of the PGF into the Federal Columbia River Transmission System (FCRTS) at BPA's proposed McNary-John Day 500-kilovolt (kV) transmission line at a point approximately

398

Microsoft Word - CX-Cardwell-Cowlitz2011WoodPoles_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of all aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115-kilovolt (kV) transmission line Budget Information: Work Order #00279267 PP&A Project No.: 2021 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights of way, infrastructures (e.g.. structures)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is located along Bonneville Power Administration's (BPA)

399

Microsoft Word - CX-LanePhaseSeparationProjects_FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Michael Marleau - TEP-TPP-1 Project Manager Proposed Action: Lane Substation 500/230-kV Transformer Phase Separation Project Project Work Order Number: 00298187 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities Location: Lane Substation, Lane County, Oregon Township 17 South, Range 5 East, Section 36 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to increase the physical distance that separates each phase of the 500/230-kiloVolt transformer banks at BPA's Lane Substation. The reason for the increased distance is to minimize the effects of a transformer fire or explosion as

400

Microsoft Word - CX_Memo_MonroeSubstation.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Monroe Substation Integrated Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electrical power substations and interconnection facilities Location: Snohomish County, Washington; Township 28 North, Range 7 East, Section 22 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The purpose of the project is to provide upgrades required as part of BPA's ongoing sustaining programs by providing voltage support and preventing power outages. The project would consist of the following activities: ï‚· Installation of two new 500-kilovolt (kV) shunt capacitor groups with current limiting

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - CX-Pearl-Marion-Tower-6-2-Replace_FY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Pearl-Marion No.1 Tower 6/2 replacement project PP&A Project No.: PP&A 2147, WO# 00296634, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Canby, Clackamas County, Oregon Township 3 South, Range 1 East, Section 19 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace a single tower (6/2) on the existing Pearl-Marion No. 1 500-kilovolt (kV) transmission line. Tower 6/2 is located along the Molalla River where natural river channel movement and continued stream bank erosion

402

CX-010549: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-010549: Categorical Exclusion Determination Chappell, Julesburg, and Kersey Tap Line Switch Replacements in Deuel County, Nebraska and Weld County, Colorado CX(s) Applied: B4.6, B4.11 Date: 06/04/2013 Location(s): Nebraska, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (WAPA) proposes to replace the wood-switch structures and 115-kilovolt (kV) line disconnect switches with new switches and steel-box structures at the Chappell and Julesburg Taps in Deuel County, Nebraska and the Kersey Tap in Weld County, Colorado. CX-010549.pdf More Documents & Publications CX-008785: Categorical Exclusion Determination CX-009804: Categorical Exclusion Determination

403

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 16450 of 26,764 results. 41 - 16450 of 26,764 results. Page EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available. http://energy.gov/nepa/ea-1931-keeler-forest-grove-forest-grove-tillamook-line-no-1-line-rebuild-project-washington

404

CX-006304: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04: Categorical Exclusion Determination 04: Categorical Exclusion Determination CX-006304: Categorical Exclusion Determination Grand Coulee-Bell #3/Grand Coulee-Westside #1 Insulator Replacement and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace worn insulators along the 83-mile Grand Coulee-Bell No. 3 230 kilovolt (kV) double circuit transmission line. Work would be conducted on energized lines using live-line and bare-hand techniques as well as standard techniques requiring an outage. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006304.pdf More Documents & Publications CX-005379: Categorical Exclusion Determination CX-008704: Categorical Exclusion Determination

405

Microsoft Word - Big Eddy ROD.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration's Administration's Big Eddy-Knight Transmission Project Record of Decision September 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. As described in the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421, July 2011), this project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that will be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. For the

406

Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum John Brank Project Manager - TPC-OL Proposed Action: Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-kilovolt (kV) line/convert microwave signals from analog to digital Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: The BPA Chehalis-Covington project would take place at the Chehalis Substation, in Lewis County, WA, at the Covington Substation, in King County, WA and at Tacoma Power's (TPWR) South Tacoma Substation in Pierce County, WA. Proposed by: BPA Description of the Proposed Action: The BPA and TPWR have developed a joint plan to convert the microwave transfer trip signals

407

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

408

EIS-0443: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Impact Statement 3: Final Environmental Impact Statement EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

409

Microsoft Word - CX-Keeler-OregonCity_Access_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shelley Fenton Shelley Fenton Realty Specialist - TERR-3 Proposed Action: Bonneville Power Administration (BPA) proposes to grant the Murray Hill Recreation Association permission to cross the BPA right-of-way on the Keeler-Oregon City No. 2, 115-kilovolt (kV) corridor between Tower 14/4 and Tower 14/6+250. PP&A Project No.: PP&A 2023 Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Grant or denial of requests for multiple use of a transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and drainage culverts. Location: Section 32; Township 1 South; Range 1 West; Willamette Meridian; Washington County, Oregon Proposed by: BPA

410

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Final Environmental Impact Statement - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

411

EIS-0421: Record of Decision | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

: Record of Decision : Record of Decision EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington For more information contact: Ms. Stacy Mason, Environmental Coordinator Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-5455 Electronic mail: slmason@bpa.gov BPA has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. This project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA?s existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4

412

EA-1731: Mitigation Acton Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Mitigation Acton Plan 1: Mitigation Acton Plan EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla Walla-Tucannon River Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 47-mile-long 115-kilovolt (kV) transmission line from the existing Walla Walla Substation, located in the city of Walla Walla, Washington, to the existing Tucannon River Substation, located near the town of Dayton, Washington. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Finding of No Significant Impact EA-1731: Final Environmental Assessment

413

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for New Transmission for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

414

Microsoft Word - CaptainJack_Olinda_CX_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cynthia Rounds Project Manager- TPC Proposed Action: Captain Jack-Olinda RAS LLL/LT Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.31 Installation or relocation of machinery and equipment Location: Olinda Substation, Shasta County, CA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund upgrades to BPA equipment at the Transmission Agency of Northern California 500-kilovolt (kV) Olinda Substation (also known as Vic Fazio Substation), which is operated and maintained by Western Area Power Administration (Western). BPA would fund Western to relocate existing and install new

415

Microsoft Word - CX-Hat_Rock_Switch_14June2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2013 7, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Glenn Russell Project Manager -TPCV-TPP-4 Proposed Action: Hat Rock Switching Station Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Umatilla County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund PacifiCorp's rebuild of BPA's Hat Rock Tap Switching Station, which is located within PacifiCorp's McNary-Wallula 230-kilovolt (kV) transmission line right-of-way (ROW). Rebuilding the switching station would include the replacement of sectionalizing switches, the grounding grid, and all signage. The approximately 0.5-acre yard would

416

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

417

CX-002196: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2196: Categorical Exclusion Determination 2196: Categorical Exclusion Determination CX-002196: Categorical Exclusion Determination STS-100 Test Stand Experiment CX(s) Applied: B3.6 Date: 05/04/2010 Location(s): Princeton, New Jersey Office(s): Princeton Site Office, Science The proposed action would consist of operation of a 100 kilovolt (kV) test stand, the STS-I00, acquired from the Lawrence Berkeley National Laboratory (LBNL), in which advanced plasma sources will be developed and ion-ion plasmas will be studied at Princeton Plasma Physics Laboratory. The STS-100 would be used to generate 100 kilo-electron volt ion beams, as well as a general purpose vacuum chamber with excellent diagnostic access. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002196.pdf More Documents & Publications EA-0813: Final Environmental Assessment

418

Microsoft Word - FONSI master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1591 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. BPA has prepared an environmental assessment (DOE/EA-1591) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

419

EA-1366: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

66: Finding of No Significant Impact 66: Finding of No Significant Impact EA-1366: Finding of No Significant Impact Santiam-Bethel Tap Transmission Line Project, Oregon Bonneville Power Administration (BPA) proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection (tap) to Portland General Electric's (PGE) Bethel Substation to improve transmission system reliability in the Salem area of northwestern Oregon. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits (double-circuit) in the existing right-of-way. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate overloading of the existing line from Santiam Substation to the

420

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Microsoft Word - FONSI final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville-Alcoa Access Road Project Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. BPA has prepared an Environmental Assessment (DOE/EA-1467) to determine if the Proposed Action would cause significant effects that would warrant preparing an Environmental Impact

422

Microsoft Word - Flathead-Sub-L0307-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 2010 13, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Electrical Engineer - TESD-CSB-2 Proposed Action: Flathead Substation Bay Addition - L0307 Budget Information: Work Order # 00004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Flathead County, Montana (T29N, R21W, Section 30) Proposed by: Bonneville Power Administration (BPA) and Flathead Electric Cooperative (FEC) Description of the Proposed Action: FEC has requested a new 230-kilovolt (kV) point of delivery at

423

O:\ELECTRIC\PP-177.ORD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BURKE-DIVIDE ELECTRIC COOPERATIVE, INC. BURKE-DIVIDE ELECTRIC COOPERATIVE, INC. ORDER NO. PP-177 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated March 18, 1998, Burke-Divide Electric Cooperative, Inc. (Burke- Divide) applied to FE for a Presidential permit to construct approximately 6,275 feet of 12.47- kilovolt (kV) electric distribution line from a point in North Star Township, Burke County, North

424

Microsoft Word - CX-Midway-Vantage-Fiber.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Midway Area Fiber Project Budget Information: Work Order 00224734, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. Location: Grant and Benton Counties, Washington Township 13 North, Range 24 East, Sections 2, 11, and 14 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install about 1.5 miles of aerial fiber optic cable on the existing Midway-Rocky Ford No.1 230-kilovolt (kV) transmission line. The new fiber

425

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 23700 of 28,560 results. 91 - 23700 of 28,560 results. Download CX-008402: Categorical Exclusion Determination Granby Pumping Plant Switchyard - Transformer Protective Barrier Walls CX(s) Applied: B4.6 Date: 05/04/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008402-categorical-exclusion-determination Download CX-008406: Categorical Exclusion Determination Structure Replacement Flaming Gorge-Vernal No.3 138 Kilovolt Transmission Line CX(s) Applied: B4.6 Date: 03/06/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008406-categorical-exclusion-determination Download CX-008775: Categorical Exclusion Determination Archer KV1A Replacement Laramie County, Wyoming

426

EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and  

NLE Websites -- All DOE Office Websites (Extended Search)

96: San Luis Transmission Project, Alameda, Merced, San 96: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California Summary DOE's Western Area Power Administration, with the Bureau of Reclamation as a cooperating agency, is preparing a joint EIS and environmental impact report (under the California Environmental Quality Act) to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. Western proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a

427

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

428

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

429

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

430

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee for New Transmission Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

431

Microsoft Word - Ch1_PN_040611km  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bandon-Rogue Transmission Line Bandon-Rogue Transmission Line Rebuild Project Finding of No Significant Impact May 2011 This page left intentionally blank. Bonneville Power Administration 1 Bandon-Rogue Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE EA-1739 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Bandon-Rogue Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Bandon-Rogue 115-kilovolt (kV) transmission line. The 46-mile-long transmission line is located in Coos and Curry counties in Oregon, extending from the city of Bandon to near Nesika Beach.

432

CX-009786: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86: Categorical Exclusion Determination 86: Categorical Exclusion Determination CX-009786: Categorical Exclusion Determination Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25 megavolt Ampere Beck Road Substation, to serve load growth in the region east of Spokane, Washington. CX-009786.pdf More Documents & Publications CX-008691: Categorical Exclusion Determination

433

Microsoft Word - SWPAIceStormDamage_021109.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1/09 1/09 Contacts: Beth Nielsen William Hiller Phone: 918-595-6762 918-595-6697 Email: elizabeth.nielsen@swpa.gov william.hiller@swpa.gov 1 of 1 TULSA, OK - A major segment of 161-kilovolt (kV) transmission line was returned to service around 6:00 p.m. on Tuesday, February 10, 2009, as Southwestern Power Administration (Southwestern), an agency of the U.S. Department of Energy (DOE), continued its efforts to repair damage caused by a January 26-27, 2009 ice storm in Arkansas and Missouri that affected 300 miles of Southwestern's 1,380-mile, high-voltage transmission system. Southwestern Operations reported early February 11, 2009, that repairs to the line stretching from Dardanelle Dam, near Russellville, Arkansas, to the Hilltop Switching Station near Marshall,

434

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 9110 of 31,917 results. 01 - 9110 of 31,917 results. Download CX-008161: Categorical Exclusion Determination Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008161-categorical-exclusion-determination Download CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008716-categorical-exclusion-determination Download EERE Program Management Guide- Chapter 2

435

CX-007172: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

436

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

437

EA-1644: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain Transmission Project, Richland County, Montana (06/17/09)

438

Microsoft Word - CX_Memo_Beck.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 07, 2013 January 07, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager - TEP-CSB-1 Proposed Action: Beck Road Substation Meter Installation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment. Location: Kootenai County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25

439

EIS-0374: EPA Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Final Environmental EPA Notice of Availability of the Final Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon Final EIS, BPA, OR, Klondike III Wind Project (300 megawatts {MW}) and Biglow Canyon Wind Farm (400 megawatts {MW}) Integration Project, Construction and Operation of a Double-Circuit 230- Kilovolt (kV) Transmission, Sherman County, OR. DOE/EIS-0374, Environmental Protection Agency, Notice of Availability of the Final Environmental Impact Statement for Department of Energy, Bonneville Power Administration, Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon, 71 FR 55463 (September 2006) More Documents & Publications

440

CX-006280: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-006280: Categorical Exclusion Determination Gore Pass Substation Pole Replacement CX(s) Applied: B1.3 Date: 07/01/2011 Location(s): Ground County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration's Craig Field Office plans to replace pole 0/1 in-kind on the Gore Pass-Muddy Pass 69 kilovolt (kV) transmission line. The pole is approximately 60 feet outside the Gore Pass Substation fence and is located between two access roads. The area has considerable ongoing vehicle traffic and human activity. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006280.pdf More Documents & Publications CX-001652: Categorical Exclusion Determination CX-008793: Categorical Exclusion Determination

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Department of Energy Offers Conditional Commitment for a Loan Guarantee for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a Loan a Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Offers Conditional Commitment for a Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest October 19, 2010 - 12:00am Addthis Washington, D.C. -- The U.S. Department of Energy today announced the offer of a conditional commitment for a $350 million loan guarantee to develop the One Nevada Transmission Line (ON Line), the first transmission line project to be offered a conditional commitment by the Loan Programs Office of the Department of Energy. ON Line consists of a new 500 kilovolt (kV) AC transmission line that will run 235 miles from Ely, Nevada to just north of Las Vegas, with a new substation located at the northern end of the line.

442

Microsoft Word - CX_Memo_Kspell  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01, 2013 01, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Kalispell Substation Shunt Capacitor Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand the substation yard, install new equipment, and construct a new control house within BPA's existing 115-kilovolt (kV) Kalispell Substation in Flathead County, Montana. Existing low voltage conditions at Kalispell Substation could compromise system reliability in the event of a single line loss, which violates BPA steady-

443

CX-005130: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-005130: Categorical Exclusion Determination Ringold Substation Structure Replacement Project CX(s) Applied: B4.6 Date: 01/21/2011 Location(s): Basin City, Washington Office(s): Bonneville Power Administration Bonneville Power Administration is proposing to replace the single pole structure 8/9 of the Benton-Scooteney No. 1 115-kilovolt (kV) transmission line, the attached vertically mounted disconnect switch, and current guy wiring with a new, 30-foot wide, three-pole transposition structure, a new horizontally mounted disconnect switch, and new guy wiring. In addition, a new 14-foot wide two-pole structure and a new 25?5-foot switch support structure would be installed roughly 30-feet ahead of the substation dead-end and approximately 15-feet ahead of the KD, respectively. There

444

EA-1636: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

445

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

446

Docket No. ER12--000, Request to Recover Prudently-Incurred Costs Associated with  

E-Print Network (OSTI)

Dear Secretary Bose: Pursuant to Section 205 of the Federal Power Act (FPA) 1 and Part 35 of the regulations of the Federal Energy Regulatory Commission (Commission), 2 Public Service Electric and Gas Company (PSE&G) hereby submits for filing revised tariff sheets to the Open Access Transmission Tariff (OATT) administered by PJM Interconnection, L.L.C. (PJM) modifying PSE&G’s existing cost-of-service formula rate (Formula Rate) to permit the recovery of prudently incurred costs associated with the abandonment of the Branchburg-Roseland-Hudson 500 kilovolt (kV) project (BRH Project or the Project). PSE&G respectfully requests that the Commission permit the revised tariff sheets to become effective in sixty (60) days (i.e., September 17, 2012) with no suspension period or hearing. 1

Law Department; Honorable Kimberly; D. Bose

2012-01-01T23:59:59.000Z

447

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

448

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final  

DOE Green Energy (OSTI)

This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

None

1999-02-01T23:59:59.000Z

449

EIS-0325: EPA Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25: EPA Notice of Availability of the Final Environmental 25: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0325: EPA Notice of Availability of the Final Environmental Impact Statement Schultz-Hanford Transmission Line Project New 500 kilovolt (kV) Transmission Line Construction, Central Washington, north of Hanford connecting to existing line at the Schultz Substation, Kittitas, Yakima, Grant, and Benton Counties, Washington U.S. Environmental Protection Agency Environmental Impact Statements; Notice of Availability of the Schultz-Hanford Transmission Line Project Final Environmental Impact Statement, DOE/EIS-0325 (January 2003) (68 FR 5019) More Documents & Publications EIS-0318: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0323: EPA Notice of Availability of the Final

450

EA-1635: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

635: Finding of No Significant Impact 635: Finding of No Significant Impact EA-1635: Finding of No Significant Impact Williston to Tioga Transmission Line Project, North Dakota Basin Electric Power Cooperative (BEPC) proposes to construct and operate a new 230-kilovolt (kV) transmission line to meet existing and future electric power requirements in northwestern North Dakota, and to interconnect this new transmission line to the Western Area Power Administration's (Western) transmission system. The EA identified no potentially significant impacts to environmental resources resulting from either Western's Federal action or Basin Electric's Proposed Project. Finding of No Significant Impact for Williston to Tioga Transmission Line Project Pre-Approval Review, DOE/EA-1635 (May 2010) More Documents & Publications

451

CX-008678: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

678: Categorical Exclusion Determination 678: Categorical Exclusion Determination CX-008678: Categorical Exclusion Determination Hot Springs Substation Gravity Drain Install CX(s) Applied: B4.6 Date: 07/19/2012 Location(s): Montana Offices(s): Bonneville Power Administration Install gravity drain system and oil stop valves, reshape west side perimeter ditch and flush out yard drains at the Hot Springs Substation. Using directional drilling equipment, approximately 3,644 linear feet of gravity drain line will be installed under the existing electrical manhole system located in the Hot Springs Substation 230 and 500 Kilovolt (kV) yards. Microsoft Word - CX-HotSpringsGravityDrainsFY12_WEB.doc More Documents & Publications EIS-0285-SA-81: Supplement Analysis CX-005010: Categorical Exclusion Determination

452

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

453

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

454

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrical Interconnection of the Windy Point Wind Energy Project Electrical Interconnection of the Windy Point Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS.1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the

455

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

456

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 30140 of 31,917 results. 31 - 30140 of 31,917 results. Download CX-010425: Categorical Exclusion Determination Pearl-Keeler Right-of-Way (ROW) Marking Project CX(s) Applied: B1.3 Date: 06/11/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010425-categorical-exclusion-determination Download CX-010427: Categorical Exclusion Determination Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010427-categorical-exclusion-determination Download CX-010428: Categorical Exclusion Determination Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon

457

PP-174.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IMPERIAL IRRIGATION DISTRICT IMPERIAL IRRIGATION DISTRICT ORDER NO. PP-174 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated February 17, 1998, Imperial Irrigation District (IID) applied to FE for a Presidential permit. IID proposed to expand its existing Bravo Substation in the vicinity of Calexico, California, by 5,825 square feet and to construct either 2,100 feet (Option 1) or 200 feet (Option 2) of 230-kilovolt (kV) transmission line

458

CX-005013: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

013: Categorical Exclusion Determination 013: Categorical Exclusion Determination CX-005013: Categorical Exclusion Determination Installing Fiber Optic Cables Between Bonneville Power Administration?s Ashe Substation and Energy Northwest?s Columbia Generating Station Date: 01/05/2011 Location(s): Benton County, Washington Office(s): Bonneville Power Administration About 200 feet of fiber optic cables will be installed on the structures of the current Bonneville Power Administration WNP-2-1 500 kilovolt (kV) transmission line. One new wood pole will be installed within the Columbia Generating Station (CGS) administrative area. The new pole location is in a heavily disturbed area. Auguring or digging would be planned to place the new pole. If the hole is excavated by a backhoe, disturbance would be

459

ENV IRONMENTA L REV  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENV ENV IRONMENTA L REV IEW for CATEG ORI CA L EXC L US ION DETE RM I NATION Rocky Mounta in Regio n, \ Vestcrn Area Powe r Ad minist rat ion Archer 230·kV Bay Addition for New Poin t of Delivery - Stage 07 A. Brief Description of Pro pos al: Tri-State Generation and Transmission Association, Inc. (Tri-State), has requested an interconnection to Western Area Power Administration's (Western) Archer 23011 I5-Kilovolt (kV) Substation (Archer Substation). The Archer Substation is a Designated Point of Delivery from Western to Tri-State as set forth in Exhibit A of Contract No. 87-LAO-I72 (TS-89-0005), Finn Electric Service (Contract). The purpose of the request from Tri-State is to serve the load of its member cooperative, High West Energy. The request was made and is being considered under the provisions of the Contract.

460

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Microsoft Word - Creston-Bell FONSI_final_external.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Finding of No Significant Impact Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-4406 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Creston-Bell Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Proposed Action is to rebuild the 53.8-mile-long 115-kilovolt (kV) Creston-Bell transmission line, conduct work on access roads, and remove danger trees. The existing 53.8-mile-long transmission line was built in 1942 and extends east from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of

462

Microsoft Word - WWTR_FONSI05162011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Finding of No Significant Impact May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Finding of No Significant Impact Walla Walla-Tucannon Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact and Floodplain Statement of Findings DOE EA-1731 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115- kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is

463

Data:F7b8506d-5d3e-4ce0-abc9-a4a383eda56e | Open Energy Information  

Open Energy Info (EERE)

06d-5d3e-4ce0-abc9-a4a383eda56e 06d-5d3e-4ce0-abc9-a4a383eda56e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wheat Belt Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: LARGE POWER Sector: Industrial Description: Qualifying Service Any single-phase or multi-phase service, greater than 50 kVA and less than 1000 kVA connected transformer capacity, delivered from the 12.5/7.2 or 24.9/14.4 kV distribution system. Power Factor Charge A power factor charge will be assessed to compensate for average power factor lower than eightyfive (85%) lagging. The power factor charge will be calculated by increasing the demand charge by one percent (1%) for each one percent (1%) by which the average power factor is less than eightyfive (85%) lagging. The District will consult with the customer regarding power factor correction and applicable charges before applying the provisions of this clause.

464

City of Hugoton, Kansas (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Hugoton, Kansas (Utility Company) Hugoton, Kansas (Utility Company) Jump to: navigation, search Name City of Hugoton Place Kansas Utility Id 9011 Utility Location Yes Ownership M NERC Location SPP Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png All-Electric inside city limits Residential All-Electric outside city limits Residential Commercial (Three Phase) inside city limits Commercial Commercial (Three Phase) outside city limits Commercial Commercial Large Power (Transformer size of 75 KvA or more) inside city

465

Data:D910241b-216d-4f54-988b-4a2c5087218a | Open Energy Information  

Open Energy Info (EERE)

0241b-216d-4f54-988b-4a2c5087218a 0241b-216d-4f54-988b-4a2c5087218a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: End date if known: Rate name: Cogeneration 35kV Backup Sector: Description: Excess kVA Source or reference: http://www.les.com/your_business/rate_schedules_llp.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

466

Roosevelt Public Power Dist | Open Energy Information  

Open Energy Info (EERE)

Public Power Dist Public Power Dist Place Nebraska Utility Id 16164 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Industrial 12.5 kv Industrial Large Commercial, OVER 50KVA Commercial Net Metering Residential Over 50 HP Irrigation Commercial Residential -General Purpose Residential Small 3 Phase Commercial Standby Commercial Standby Irrigation Commercial Time of Day- single phase Under 50 HP Irrigation Commercial Average Rates Residential: $0.1050/kWh Commercial: $0.1190/kWh Industrial: $0.1150/kWh

467

Back-to-Back Energization of a 60kV Cable Network -Inrush Currents Phenomenon  

E-Print Network (OSTI)

of capacitor banks in parallel. When energizing a capacitor bank that is in parallel with an already energized capacitor bank there will be an inrush current whose amplitude depends of the voltage in the connection was supported by ENV: Elforsyningen Nordvendsyssel F. F. da Silva is a PhD student at the Institute of Energy

Silva, Filipe Faria Da

468

150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION  

E-Print Network (OSTI)

or in single banks to limit maximum energy available to thereliable energy storage systems. We have operated many banksbanks of 450-V electrolytic capacitors for over 10 joules of energy

Owren, H.

2011-01-01T23:59:59.000Z

469

A SCR SWITCHED CAPACITOR VOLTAGE REGULATOR FOR 150 kV NEUTRAL BEAM POWER SUPPLY  

E-Print Network (OSTI)

REGULATOR BANK MODULES .26 MJ STORED ENERGY BEAM SOURCE j_amount of stored energy and main bank capacitance is 2J - CEof the main bank, given that the total stored energy is 1.56

Milnes, K.A.

2011-01-01T23:59:59.000Z

470

A Prominent Soma-Dendritic Distribution of Kv3.3 K Channels in  

E-Print Network (OSTI)

-0-691-14515-0 $75.00 | £52.00 What Are Gamma-Ray Bursts? Joshua S. Bloom "This is a marvelous book. It contains the new results from the fast-developing science of gamma-ray-burst astronomy along with its fascinating.00 __ Pa: 14557-0 Bloom: what Are Gamma-Ray 11 27.95 19.95 __ Cl: 14556-3 80.00 55.00 __ Pa: 15233-2 Bonner

Turner, Ray

471

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Court Orders Court Orders Imperial-Mexicali DEIS A-1 May 2004 APPENDIX A: COURT ORDERS Court Orders Imperial-Mexicali DEIS A-2 May 2004 Court Orders Imperial-Mexicali DEIS A-3 May 2004 APPENDIX A: COURT ORDERS This appendix contains the court orders issued on May 2, 2003, and July 8, 2003, by the United States District Court, Southern District of California (Case No. 02-CV-513-IEG (POR)), in the case of the Border Power Plant Working Group versus the U.S. Department of Energy and the Bureau of Land Management. Court Orders Imperial-Mexicali DEIS A-4 May 2004 Court Orders Imperial-Mexicali DEIS A-5 May 2004 Court Orders Imperial-Mexicali DEIS A-6 May 2004 Court Orders Imperial-Mexicali DEIS A-7 May 2004 Court Orders Imperial-Mexicali DEIS A-8 May 2004 Court Orders Imperial-Mexicali DEIS A-9 May 2004

472

High speed transfer switch with 50 kA and 50 kV  

SciTech Connect

This paper gives the mechanical design and electrical parameters of a pneumatically operated transfer switch. This design is used to switch 3-second 50-kA current pulses, and is easily capable of 75 kA operation (2 {times} 10{sup 10} I{sup 2}t); with water-cooled versions capable of 20 kA continuously. Although the switch is not specifically designed to make or break 50 kA, it is provided with auxiliary Elkonite arcing contacts have proven their value in protecting the main electrodes even under repetitive (50 kA) fault conditions. Included in this presentation will be the results of extensive life testing and associated criteria. 6 figs., 1 tab.

Reass, W.A.; Kasik, R.J.; Wilds, W.A.

1989-01-01T23:59:59.000Z

473

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The next planned outage on xxxxx high voltage circuit between xxxxx and xxxxx is tentatively scheduled for Saturday May 19, 2007 and will begin at 4:00 AM with a scheduled return...

474

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3, 2007 and will...

475

Study on Bipole Protection of #x00B1;800KV UHVDC System  

Science Conference Proceedings (OSTI)

The main circuit of UHVDC transmission system in China is introduced. Based on the ABB HVDC control protection system, the principle and method of the interface technology between the PSCAD/EMTDC and HIDRAW are introduced. An off-line real-time simulation ... Keywords: UHVDC protection, PSCAD/EMTDC, HIDRAW, Bipole protection

Xiao-kang Xu; Ming-chao Xia

2010-06-01T23:59:59.000Z

476

Development and interrupting tests on 250KV 8KA HVDC circuit breaker  

SciTech Connect

This paper describes the circuit and component selections, development and equivalent circuit test results on an HVDC circuit breaker for an HVDC transmission line. A puffer type SF/sub 6/ gas interrupter for AC circuit breakers is utilized for interrupting DC current with injection of high-frequency inverse current from a commutating capacitor precharged to HVDC line voltage. Also, the effectiveness of application of the HVDC breaker to an HVDC system with two parallel transmission lines is demonstrated through the EMTP simulation.

Tokuyama, S.; Arimatsu, K.; Hirata, K.; Kato, Y.; Yoshioka, Y.

1985-09-01T23:59:59.000Z

477

A New Operational Tests Circuit for Testing ±660kV UHVDC Thyristor Valves  

Science Conference Proceedings (OSTI)

Operational test is an important measure which can guarantee safe and stable operation of UHVDC thyristor valves. HVDC thyristor modules can be performed either in a six-pulse back-to-back test circuit or in a synthetic test circuit. UHVDC thyristor ... Keywords: HVDC thyristor valve, operational tests, synthetic test circuit

Ting Xie; Tang Guang-fu; Zha Kun-peng; Gao Chong

2010-06-01T23:59:59.000Z

478

Transient Analysis of 220kV Distribution Substation: A Case Study  

Science Conference Proceedings (OSTI)

Power system has dynamic behavior as it faces various disturbances like sudden change in load, sudden change in generation and various faults. During transients parameters of power system has been changed and it is very necessary to measure and check ... Keywords: Transient stability analysis, Runge-Kutta method, Transient, Power system

K. B. Porate; Shital C. Gabhane

2010-11-01T23:59:59.000Z

479

500-kV HVDC air-blast circuit breaker. Final report  

Science Conference Proceedings (OSTI)

This report describes the first HVDC circuit breaker to be tested on a full-scale utility system. Modular in construction to ensure economic feasibility, this breaker has a standard ac air-blast breaker as its main component and interrupts current up to 2200-A dc.

Bachman, B.; Ruoss, E.

1986-08-01T23:59:59.000Z

480

EPRI AC Transmission Line Reference Book-200kV and Above, 2012 Edition  

Science Conference Proceedings (OSTI)

This version of the Redbook is available in PDF only and contains an updated chapter on Right-of-Way management. An older version (#1011974) is available in hardcopy only. You must download Product #1011973 in order to get the companion applets to the report.In 2012, EPRI has undertaken an effort to update this most recent edition of the longtime industry standard EPRI Transmission Line Reference Book, or the “Red Book,” ...

2012-10-30T23:59:59.000Z