EA-1671: Big River Substation to Poston Substation 69-Kilovolt...  

Broader source: Energy.gov (indexed) [DOE]

671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California EA-1671: Big River Substation to Poston Substation 69-Kilovolt...

2

Leafy Biomass Gasifier for 15 kVA Diesel Genset  

Science Journals Connector (OSTI)

A 15 kVA diesel genset powered by a loose sugarcane leaves gasifier was successfully tested and long-term data ... 20-40 cm (water gage). The gasifier also produces char which is 2028% by ... . Tests conducted wi...

Anil K. Rajvanshi; Rajiv M. Jorapur

1993-01-01T23:59:59.000Z

3

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

4

EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead  

Broader source: Energy.gov (indexed) [DOE]

62: Construction and Routine Operation of a 12-kilovolt 62: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California SUMMARY This EA evaluates the environmental impacts of the proposal to install an overhead powerline extension from the U.S. Department of Energy's Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, which will significantly reduce NPR-1's overall utility costs. NPR-1 is known as Elk Hills oil field and is located in the southern San Joaquin Valley,

5

EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

6

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Broader source: Energy.gov (indexed) [DOE]

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

7

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

8

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

9

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

10

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

11

500-kV Central Ferry Substation ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Ferry Substation in Garfield County, Wash., to BPA's 500-kV Lower Monumental Substation in Walla Walla County, Wash. BPA is currently considering two routing...

12

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

13

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

14

Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

N /A

2000-03-20T23:59:59.000Z

15

High reliability low jitter 80 kV pulse generator  

Science Journals Connector (OSTI)

Switching can be considered to be the essence of pulsed power. Time accurate switch/trigger systems with low inductance are useful in many applications. This article describes a unique switch geometry coupled with a low-inductance capacitive energy store. The system provides a fast-rising high voltage pulse into a low impedance load. It can be challenging to generate high voltage (more than 50 kilovolts) into impedances less than 10???, from a low voltage control signal with a fast rise time and high temporal accuracy. The required power amplification is large, and is usually accomplished with multiple stages. The multiple stages can adversely affect the temporal accuracy and the reliability of the system. In the present application, a highly reliable and low jitter trigger generator was required for the Z pulsed-power facility [M.?E. Savage, L.?F. Bennett, D.?E. Bliss, W.?T. Clark, R.?S. Coats,J.?M. Elizondo, K.?R. LeChien, H.?C. Harjes, J.?M. Lehr, J.?E. Maenchen, D.?H. McDaniel, M.?F. Pasik, T.?D. Pointon, A.?C. Owen, D.?B. Seidel, D.?L. Smith, B.?S. Stoltzfus, K.?W. Struve, W.?A. Stygar, L.?K. Warne, and J.?R. Woodworth, 2007 IEEE Pulsed Power Conference, Albuquerque, NM (IEEE, Piscataway, NJ, 2007), p. 979]. The large investment in each Z experiment demands low prefire probability and low jitter simultaneously. The system described here is based on a 100 kV DC-charged high-pressure spark gap, triggered with an ultraviolet laser. The system uses a single optical path for simultaneously triggering two parallel switches, allowing lower inductance and electrode erosion with a simple optical system. Performance of the system includes 6 ns output rise time into 5.6???, 550 ps one-sigma jitter measured from the 5 V trigger to the high voltage output, and misfire probability less than 10-4. The design of the system and some key measurements will be shown in the paper. We will discuss the design goals related to high reliability and low jitter. While reliability is usually important, and is coupled with jitter, reliability is seldom given more than a qualitative analysis (if any at all). We will show how reliability of the system was calculated, and results of a jitter-reliability tradeoff study. We will describe the behavior of sulfur hexafluoride as the insulating gas in the mildly nonuniform field geometry at pressures of 300 to 500 kPa. We will show the resistance of the arc channels, and show the performance comparisons with normal two-channel operation, and single channel operation.

M. E. Savage and B. S. Stoltzfus

2009-08-27T23:59:59.000Z

16

Vibration Proof Construction of 1000kV Electron Microscope  

Science Journals Connector (OSTI)

......University Press 1970 other ORIGINAL Vibration Proof Construction of 1000kV Electron...with the center of gravity. That is, a vibration proof hanging console was made as a method...protecting a 1000kV Electron Microscope from vibration, and this allowed the whole instrument......

Yoshio SAKITANI; Susumu OZASA

1970-01-01T23:59:59.000Z

17

EIS-0078: Jonesboro-Hergett 161-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

18

BE 400/18 kV Substation Renovation Project  

E-Print Network [OSTI]

The 400/18 kV SPS main substation was designed for the 400 GeV SPS project and was commissioned in 1974. It has been upgraded several times to form the present 400/66/18 kV SPS and LEP transmission power comprising 490 MVA and 240 MVAR installed power. The beginning of the LHC project and the obsolescence of the main elements, and consequently limited reliability, made it necessary to begin a complete renovation program. The new configuration of the substation will integrate the new compensator of reactive power efficiently into the 18 kV pulsed network. In this way the new compensator will facilitate the functioning of the pulsed network with the new loads and it will improve the performance of the electrical substation. The renovation program consists in a global reorganisation of the substation, with the total replacement of the 18 kV power equipment, a set up of new control and protection systems for the 18 kV and 400 kV section and the reconditioning of all the 400 kV equipment.

Vairo, Antonio

2001-01-01T23:59:59.000Z

19

Alvey-Fairview No.1, 230 kV Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration is planning to rebuild the Alvey Fairview No. 1, 230kV transmission line, construction is scheduled for 2013 or 2014. The 97.46 mile transmission line...

20

Análise metodológica para a conversão de linhas de distribuição de 34,5 KV para 69 KV.  

E-Print Network [OSTI]

??Este trabalho visa apresentar uma análise metodológica para viabilizar a realização da repotenciação, elevando a classe de tensão de linhas de distribuição de 34,5 kV… (more)

Patrick Santos de Oliveira

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Broader source: Energy.gov (indexed) [DOE]

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

22

69 kV shunt capacitor bank specification considerations  

SciTech Connect (OSTI)

PSI has standardized on the 69 kv ungrounded star, 7.2 mvar or multiple of the 7.2 mvar shunt capacitor bank for var control. This document defines the considerations to be addressed when specifying a 69 kv ungrounded capacitor bank and for providing suitable protection. The design goal is to provide a bank that is reliable and meets operational requirements at minimum cost with standard components. The bank components will be discussed separately. This paper defines the considerations for specifying capacitor banks to minimize cost, improve reliability and help standardize design. The components making up the bank will be individually discussed with special emphasis on the protection and control.

Fenner, G.E. (PSI Energy, Inc., Plainfield, IN (US))

1992-01-01T23:59:59.000Z

23

Development of 100kVA AC superconducting coil using NbTi cables with a CuSi alloy matrix  

SciTech Connect (OSTI)

For implementation of AC superconducting equipment, it is imperative to develop low loss cables having highly stable characteristics. Here, newly developed NbTi superconducting cables using a CuSi alloy matrix are of low loss and are very promising as cables for practical application. However, since the CuSi alloy is a new material as a matrix for NbTi superconducting cables, many unknown factors as regards to optimum conditions for the manufacture of long cables, as well as superconducting characteristics are involved. For this new superconducting cable, a long strand (km class) was manufactured as a step for practical application, and a primary twisted cable was fabricated. Using this cable, a coil of the 100kVA class was fabricated for trial, and its performance characteristic with transport current was evaluated. This coil had no training phenomenon and had high stabilities. Furthermore, it permitted full AC current transmission of up to DCIc. Upon analysis of the coil loss, the hysteresis loss was smaller than coupling loss, and there was little increase of loss due to the current flow to the coil. consequently, by using CuSi alloy matrix superconducting cables, it was possible to provide an AC coil of low loss and high stability, and the present cable was found to be promising as a new AC superconducting cable in the future.

Kasahara, H.; Akita, S.; Torii, S. [CRIEPI, Tokyo (Japan)] [CRIEPI, Tokyo (Japan); Sugimoto, M.; Matsumoto, K.; Tanaka, Y. [Furukawa Electric Co., Ltd., Nikko (Japan)] [Furukawa Electric Co., Ltd., Nikko (Japan); Tachikawa, K. [Tokai Univ., Hiratsuka (Japan)] [Tokai Univ., Hiratsuka (Japan)

1996-07-01T23:59:59.000Z

24

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Broader source: Energy.gov (indexed) [DOE]

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

25

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

SciTech Connect (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

26

ETM (Distribution Network Automation on 10 kV cable line stations...  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

27

EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

28

Back-to-Back Energization of a 60kV Cable Network -Inrush Currents Phenomenon  

E-Print Network [OSTI]

transmission lines with a rated voltage equal to and below 150kV must be put underground, in order to reduce's energization. Fig. 1. ENV 60kV Network map Fig. 2. Single Line Diagram of the analyzed area The knowledge1 Back-to-Back Energization of a 60kV Cable Network - Inrush Currents Phenomenon F. Faria da Silva

Silva, Filipe Faria Da

29

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

30

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

31

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

32

Buffalo Flat Service 115-KV Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

BPA, in conjunction with Midstate Electric Cooperative (Midstate), proposed to construct two sections of a new 115-kV transmission line in central Oregon: one section from BPA's LaPine Substation to Midstate's Fort Rock Substation (BPA), and the other from Fort Rock Substation to the proposed US Air Force radar transmitter site at Buffalo Flat (Midstate). The proposed line would be a total of about 74 miles long, and of either wood or steel single-pole construction; it would parallel existing corridors and/or roads for much of the distance. 23 refs., 6 figs., 5 tabs.

United States. Bonneville Power Administration.

1987-07-01T23:59:59.000Z

33

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect (OSTI)

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

34

EIS-0091: Garrison-Spokane 500-kV Transmission Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

35

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

SciTech Connect (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

36

Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect (OSTI)

The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

Not Available

1994-10-01T23:59:59.000Z

37

Microsoft Word - Deering Lake-Eckley 115-kV Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deering Lake-Eckley 115-kV Transmission Line Structure Replacements Yuma County, Colorado 1 A. Brief Description of Proposal: Western Area Power Administration (Western) proposes...

38

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

39

Mead-Liberty 345-kV Transmission Line Access Road Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Mead-Liberty 345-kV Transmission Line Access Road Maintenance and Localized Vegetation Management Maricopa County, Arizona Categorical Exclusion Continuation Sheet Project...

40

Bouse Hills Pumping Plant to Harcuvar 115-kV Transmission Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bouse Hills Pumping Plant to Harcuvar 115-kV Transmission Line Inset Structure Installation La Paz County, Arizona Categorical Exclusion Continuation Sheet Special Conditions 1....

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

42

EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities  

Broader source: Energy.gov [DOE]

The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

43

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

44

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

45

150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION  

E-Print Network [OSTI]

a zero failure rate. That SCR's may be connected in series120 kV operating systems. That a SCR switched capacitor bank21 Franck, J. V. , et al. , "An SCR Sedes Switch and Impulse

Owren, H.

2011-01-01T23:59:59.000Z

46

ZigBee Performance in 400 KV Air Insulated Power Substation  

Science Journals Connector (OSTI)

An experimental assessment of the impact of the electromagnetic environment of a 400 kV substation on the performance of ZigBee equipment is ... the performance of ZigBee equipment deployed in the substation with...

Qingshan Shan; I A Glover; P J Moore…

2010-01-01T23:59:59.000Z

47

Development of a 220 kV/300 MVA superconductive fault current limiter  

Science Journals Connector (OSTI)

After we developed a saturated iron core type 35 kV/90 MVA superconductive fault current limiter and installed the device in a transmission network at Puji substation of China Southern Power Grid for live-grid operation in 2007, we continued our efforts in advancing this technology. A 220 kV/300 MVA device has been designed, manufactured and factory tested. This device differs from the 35 kV device in its form of electrical insulation even though the two devices have the same working principle and similar core structure. Improvements in the dc magnetization circuit and the cryogenic system were also achieved. This 220 kV/300 MVA superconductive fault current limiter has been installed and has passed all field tests at Shigezhuang substation in Tianjin, China. Trial operation is underway. This paper introduces the major design parameters, key functional specifications and some testing results of the device.

Y Xin; W Z Gong; H Hong; Y Q Gao; X Y Niu; J Y Zhang; Y W Sun; A L Ren; H Z Wang; L F Zhang; Q Li; Z Q Wei; L Z Wang; J B Cui; G J Niu; Z Q Xiong

2012-01-01T23:59:59.000Z

48

ESS 2012 Peer Review - 6.5 kV Silicon Carbide Half-Bridge Power...  

Broader source: Energy.gov (indexed) [DOE]

a 5 kV DC-Link voltage which will greatly impact Storage Systems by reducing costs of power conversion stages Impact current system designs as well as create a platform for...

49

Grounding of a 230 kV Transmission line over a Limestone Ridge.  

E-Print Network [OSTI]

?? This thesis is a case study of a 230 kV transmission line in Lao P.D.R. Grounding of electrical systems is essential for safety and… (more)

Grubbström, Emma

2011-01-01T23:59:59.000Z

50

A 25 KV/10A PULSER FOR DRIVING A HIGH-POWER PIERCE ELECTRON GUN  

E-Print Network [OSTI]

A 25 KV/10A PULSER FOR DRIVING A HIGH-POWER PIERCE ELECTRON GUN J. J. Barroso, J. O. Rossi, H-tube pulser to drive a high-power electron gun. The tube includes a 2.0µF/100kV capacitor bank whose discharge is controlled by a tetrode tube connected to the gun cathode. Typical measured operating parameters are 3

51

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

52

14 kV single-phase superconducting fault current limiter based on YBCO films  

Science Journals Connector (OSTI)

We present the fabrication and short circuit test results of a 14 kV single-phase resistive superconducting fault current limiter (SFCL) based on \\{YBa2Cu3O7\\} (YBCO) films. Individual components were processed using the 4? YBCO films and have the rated voltage and current of 600 V and 35 A at 77 K, respectively. Twenty four components, eight components in series and three lines in parallel, make a module having the rated voltage and current of 4.8 kV and 105 A, respectively. Three modules were assembled in series to produce the SFCL working at 77 K, a 14 kV single-phase machine for the 22.9 kV Y–Y grid. short circuit tests were successfully conducted in an accredited test facility with the maximum fault currents up to 14.1 kAP. All components quenched together upon faults and shared the rated voltage evenly without any supplementary device between the modules. This proves that the SFCL based on YBCO films may not only work reliably at 22.9 kV, but also provide technical feasibility for higher voltage application including the transmission grids.

J. Sim; K.B. Park; H.R. Kim; J.S. Kang; B.W. Lee; H.M. Kim; I.S. Oh; O.B. Hyun

2007-01-01T23:59:59.000Z

53

Evaluation of first 10-kV optical ETO thyristor operating without any low-voltage control bias  

E-Print Network [OSTI]

unlike any existing ETO (or even IGCT/MTO/GTO devices) is reported at 10 kV using the Silvaco TCAD suite

Mazumder, Sudip K.

54

220 kV SSSC device for power flow control (Smart Grid Project) | Open  

Open Energy Info (EERE)

kV SSSC device for power flow control (Smart Grid Project) kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location Catalonia, Spain Coordinates 41.59116°, 1.520862° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.59116,"lon":1.520862,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

55

Microsoft Word - CX-Alvey 500 kV Fencing_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Hamid Habibi Project Manager - TESF-CSB Proposed Action: Replace existing posts and fencing around Alvey Substation 500-kV switch yard. PP&A Project No.: 1 632 Budget Information: Work Order: 00250208 Task: 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.11 Installation of fencing, including that for border marking that will not adversely affect wildlife movements or surface water flow. Location: The proposed project is located in Lane County, Oregon at the Bonneville Power Administration (BPA) Alvey substation around the 500-kV switch yard. Proposed by: BPA Description of the Proposed Action: The project involves replacement of the existing fence and fence posts for the 500-kV yard at the

56

Design studies for the Mead-Phoenix 500 kV AC transmission project  

SciTech Connect (OSTI)

The Mead-Phoenix 500 kV ac line is 243 miles long and runs parallel to the existing Mead-Liberty 345 kV line. This line is planned for 70% series and 70% shunt compensation; it also incorporates the first application of a 50 kV phase shifting transformer that enables a 1,300 MW transmission capacity. This paper presents the design studies that were undertaken in arriving at the equipment ratings and insulation levels that lead to the equipment specifications. The shunt reactor switching requirements utilizing MOV across the breaker, line switching with line connected arresters and the breaker transient recovery voltage are also dealt with in the paper.

Thallam, R.S.; Lundquist, T.G.; Gerlach, D.W. [Salt River Project, Phoenix, AZ (United States)] [Salt River Project, Phoenix, AZ (United States); Atmuri, S.R. [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada)] [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada); Selin, D.A. [Arizona Public Service Co., Phoenix, AZ (United States)] [Arizona Public Service Co., Phoenix, AZ (United States)

1995-10-01T23:59:59.000Z

57

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison  

SciTech Connect (OSTI)

Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

Kelley, Nathan; Corsaro, Pietro

2004-12-01T23:59:59.000Z

58

0.4 kV remote control (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

4 kV remote control (Smart Grid Project) 4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

59

Development of a thyristor valve for next generation 500kV HVDC transmission systems  

SciTech Connect (OSTI)

A high voltage thyristor valve is the basic component of an HVDC transmission system. Development of a 500kV valve for next generation HVDC transmission systems is described. First, the power loss of the valve is analyzed to decide a reasonable wafer size for the light triggered thyristor. From these results, a six inch diameter wafer size is selected. The light triggered thyristor, with ratings of 8kV and 3.5kA, is developed using the six inch wafer. The designing of the valve employing the thyristor and test results with the prototype valve prove that a 500kV valve can be realized by the design method.

Hasegawa, T. [Kansai Electric Power Co., Inc., Osaka (Japan)] [Kansai Electric Power Co., Inc., Osaka (Japan); Yamaji, K. [Shikoku Electric Power Co., Inc., Takamatsu (Japan)] [Shikoku Electric Power Co., Inc., Takamatsu (Japan); Irokawa, H. [Electric Power Development Co., Ltd., Tokyo (Japan)] [Electric Power Development Co., Ltd., Tokyo (Japan); Shirahama, H.; Tanaka, C.; Akabane, K.

1996-10-01T23:59:59.000Z

60

Consideration of 34. 5 KV as an in-plant voltage for a large industrial user  

SciTech Connect (OSTI)

Traditionally, the in-plant distribution voltage for a large refinery or petrochemical complex has been 13.8 kV. Selection of this voltage level was dictated primarily by economic factors, simply because in most cases the magnitude of the loads or the lengths of the feeders did not produce sufficient savings to compensate for the costlier higher voltage switchgear. This paper presents some engineering and cost considerations for distribution at 34.5 kV and attempts to show that this voltage level is both economically and technically feasible for large electrical systems.

Niculescu, T.D.; Regan, R.R.

1983-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Recreation of Neuronal Kv1 Channel Oligomers by Expression in Mammalian Cells Using Semliki Forest Virus  

Science Journals Connector (OSTI)

The multiple roles of voltage-sensitive K+ channels (Kv1 subfamily) in brain are served by subtypes containing pore-forming ? (1.1?1.6) and auxiliary ? subunits, usually in an (?)4(?)4 stoichiometry. To facilitate structure/activity analysis, combinations ...

Oleg Shamotienko; Sobia Akhtar; Christina Sidera; Frédéric A. Meunier; Barbara Ink; Malcolm Weir; J. Oliver Dolly

1999-12-01T23:59:59.000Z

62

Analysis on heat loss characteristics of a 10 kV HTS power substation  

Science Journals Connector (OSTI)

Abstract A 10 kV High Temperature Superconducting power substation (10 kV HTS substation), supported by Chinese State 863 projects, was developed and has been running to supply power for several factories for more than two years at an industrial park of Baiyin, Gansu province in Northwest China. The system of the 10 kV HTS substation compositions, including a HTS cable, a HTS transformer, a SFCL, and a SMES, are introduced. The SMES works at liquid helium temperature and the other three apparatus operates under liquid nitrogen condition. There are mainly four types of heat losses existing in each HTS apparatus of the 10 kV HTS substation, including AC loss, Joule heat loss, conductive heat, and leak-in heat from cryostat. A small quantity of AC loss still exists due to the harmonic component of the current when it carries DC for HTS apparatus. The principle and basis for analysis of the heat losses are introduced and the total heat loss of each apparatus are calculated or estimated, which agree well with the test result. The analysis and result presented are of importance for the design of the refrigeration system.

Yuping Teng; Shaotao Dai; Naihao Song; Jingye Zhang; Zhiyuan Gao; Zhiqin Zhu; Weiwei Zhou; Zhourong Wei; Liangzhen Lin; Liye Xiao

2014-01-01T23:59:59.000Z

63

Special design and testing aspects of the 345 kV East Fishkill substation  

SciTech Connect (OSTI)

The installation of two 135 MVAR capacitor banks in the 345 kV East Fishkill substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. This paper describes the design of the substation and the tests performed before commissioning the capacitor banks.

Fogarty, R.P.; Halleran, T.M.; Laskowski, L.M.; Mark, D.A. (Consolidated Edison Co. of New York, Inc., New York, NY (United States))

1992-10-01T23:59:59.000Z

64

A source of reactive power at a 35-kV substation of the Vankor oilfield  

Science Journals Connector (OSTI)

An SRP-35/10/10 source of reactive power based on a magnetically controlled RTMU-10000/35-UHL1-series shunt reactor and a capacitor bank rated at 10 MV A at voltage 35 kV is described in this work. It was put int...

B. I. Bazylev; M. A. Bryantsev; S. V. Dyagileva…

2012-03-01T23:59:59.000Z

65

A charge-pump 60kV modulator for the ISOLDE target extraction voltage  

E-Print Network [OSTI]

The ISOLDE facility at CERN provides radioactive ion beams to a number of experimental stations. These ions are produced by a metal target, floating at 60 kV, which is impacted by a 1.4 GeV high intensity proton beam. The ions are then accelerated by a grounded extraction electrode to 60 keV, before transport to the experimental area. During proton beam impact extremely high ionisation of the volume around the target gives rise to significant leakage current which results in loss of charge on the effective target capacitance of approximately 6 nF. If short life-time isotopes are to be studied, the 60 kV must be re-established within a maximum of 10 ms. Recharging the target capacitance to 60 kV and to the required stability of better than 10-4 precludes a direct charging system and an alternative method of re-establishing the 60 kV is used. The present system [1], in operation since 1991, employs a resonant circuit which is triggered 35 µs prior to beam impact. This circuit transfers the charge on the effec...

Barlow, R A; Fowler, A; Gaudillet, H; Gharsa, T; Schipper, J

2015-01-01T23:59:59.000Z

66

Final Environmental Assessment of the Trentwood Loop to the Bell-Noxon 230-kV No.1 Line.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) proposes to construct a 2.7mile (4.3-kilometer), 230-kV, double-circuit steel structured trasmission line and to install a 230/115-kV, 300 MVA autotransformer with one 115-kV terminal at Trentwood in unincorporated Spokane County, WA, about 9 miles (14.5 kilometers) east of the City of Spokane. The Bell-Noxon 230-kV No. 1 Line would be opened near Trentwood. The proposed double-circuit line would be tied to the two opened ends of the Bell-Noxon line and brought into a common 230-kV bust at Trentwood Substation via the proposed double-circuit line; this is commonly known as looping a line into a substation. This report addresses the environmental impacts of various alternative solutions. 32 refs, 3 figs., 2 tabs.

United States. Bonneville Power Administration.

1982-05-01T23:59:59.000Z

67

Plasma Immersion Ion Implantation with a 4kV/10kHz Compact High Voltage Pulser  

SciTech Connect (OSTI)

Development of a 4 kV/10 kHz Compact High Voltage Pulser and its application to nitrogen plasma immersion ion implantation (PIII) of different materials as Si, Al alloys, SS304 stainless steel and Ti alloys are discussed. Low voltage (1-5 kV) pulses at high frequencies (up to 20 kHz for 2 kV) were obtained with maximum power delivered at 5 kV, 7 kHz. These conditions were not sufficient to reach temperatures above 200 deg. C in the samples because of short duration of the pulses. However, very shallow implantations of nitrogen in Si, Al5052, SS304 were observed by Auger electron spectroscopy and improved corrosion resistance was obtained for Al5052 when it was treated by nitrogen PIII at 2.5 kV, 5{mu}s and 5 kHz pulses.

Ueda, M.; Oliveira, R. M.; Rossi, J. O. [Associated Laboratory of Plasma, National Institute for Space Research, Av. dos Astronautas 1758, Sao Jose dos Campos, Sao Paulo (Brazil); Reuther, H. [Institute of Ion Beam Physics and Materials Research, Rossendorf, Dresden (Germany); Silva, G. [Associated Laboratory of Plasma, National Institute for Space Research, Av. dos Astronautas 1758, Sao Jose dos Campos, Sao Paulo (Brazil); Department of Aeronautics and Mechanics, Technological Institute of Aeronautics, Sao Jose dos Campos, Sao Paulo (Brazil)

2006-11-13T23:59:59.000Z

68

Combined kV and MV imaging for real-time tracking of implanted fiducial markers  

SciTech Connect (OSTI)

In the presence of intrafraction organ motion, target localization uncertainty can greatly hamper the advantage of highly conformal dose techniques such as intensity modulated radiation therapy (IMRT). To minimize the adverse dosimetric effect caused by tumor motion, a real-time knowledge of the tumor position is required throughout the beam delivery process. The recent integration of onboard kV diagnostic imaging together with MV electronic portal imaging devices on linear accelerators can allow for real-time three-dimensional (3D) tumor position monitoring during a treatment delivery. The aim of this study is to demonstrate a near real-time 3D internal fiducial tracking system based on the combined use of kV and MV imaging. A commercially available radiotherapy system equipped with both kV and MV imaging systems was used in this work. A hardware video frame grabber was used to capture both kV and MV video streams simultaneously through independent video channels at 30 frames per second. The fiducial locations were extracted from the kV and MV images using a software tool. The geometric tracking capabilities of the system were evaluated using a pelvic phantom with embedded fiducials placed on a moveable stage. The maximum tracking speed of the kV/MV system is approximately 9 Hz, which is primarily limited by the frame rate of the MV imager. The geometric accuracy of the system is found to be on the order of less than 1 mm in all three spatial dimensions. The technique requires minimal hardware modification and is potentially useful for image-guided radiation therapy systems.

Wiersma, R. D.; Mao Weihua; Xing, L. [Department of Radiation Oncology, Stanford University School of Medicine, Stanford, California 94305-5847 (United States)

2008-04-15T23:59:59.000Z

69

EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

70

EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

71

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada  

Broader source: Energy.gov [DOE]

This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

72

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

73

EIS-0365: Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov [DOE]

On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

74

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable line stations) Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

75

KvH Projekt GmbH Co KG | Open Energy Information  

Open Energy Info (EERE)

KvH Projekt GmbH Co KG KvH Projekt GmbH Co KG Jump to: navigation, search Name KvH Projekt GmbH & Co KG Place Hamburg, Germany Zip D-20259 Sector Biomass, Solar, Wind energy Product Project developer in wind, solar, biomass and smart architecture. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

76

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

Science Journals Connector (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the...

S. I. Gusev; V. N. Karpov; A. N. Kiselev; V. I. Kochkin

2009-09-01T23:59:59.000Z

77

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

78

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

79

Central Ferry Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Wind Projects Central Ferry Lower Monumental Transmission Line Project BPA will build a new 500-kilovolt (kV) transmission line from BPA's Central Ferry...

80

Abstract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reinforcement Project, DOEEIS - 0436 States Involved: Washington and Oregon Abstract: BPA is proposing to build a 500-kilovolt (kV) lattice-steel-tower transmission line that...

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Central Ferry-Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Spacer Damper Replacement Program Wind Projects Central Ferry-Lower Monumental BPA will build a new 500-kilovolt (kV) transmission line from BPA's Central Ferry...

82

CX-010686: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion Determination CX-010686: Categorical Exclusion Determination Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07022013...

83

EIS-0325: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement EIS-0325: Final Environmental Impact Statement Schultz-Hanford Area Transmission Line Project BPA proposes to construct a new 500-kilovolt (kV) transmission...

84

EIS-0486: DOE Notice of Availability of Draft Environmental Impact...  

Office of Environmental Management (EM)

project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver...

85

30 kV coaxial vacuum-tight feedthrough for operation at cryogenic temperatures  

E-Print Network [OSTI]

In this paper we describe the technology of building a vacuum-tight high voltage feedthrough which is able to operate at voltages up to 30 kV. The feedthrough has a coaxial structure with a grounded sheath which makes it capable to lead high voltage potentials into cryogenic liquids, without risk of surface discharges in the gas phase above the liquid level. The feedthrough is designed to be used in ionization detectors, based on liquefied noble gases, such as Argon or Xenon.

I. Kreslo; I. Badhrees; S. Delaquis; A. Ereditato; S. Janos; M. Messina; U. Moser; B. Rossi; M. Zeller

2010-11-05T23:59:59.000Z

86

NREL: Energy Systems Integration Facility - Fixed Equipment and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Systems Integration Facility include: Electrical equipment 13.2-kV to 480-V Y-Y transformer 1,000 kVA Grid simulators in sizes from 15 kVA up to 1080 kVA RLC load banks up to...

87

Proposal for the award of a contract for the design, supply, installation and commissioning of a 66 kV electrical substation  

E-Print Network [OSTI]

Proposal for the award of a contract for the design, supply, installation and commissioning of a 66 kV electrical substation

2012-01-01T23:59:59.000Z

88

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

89

CX-010107: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination Curecanti-Morrow Point 230 Kilovolt (kV) and 12.47-kV Transmission Lines Access Road Maintenance CX(s) Applied: B1.3 Date: 04122013 Location(s): Colorado...

90

EIS-0451: Notice of Intent to Prepare an Environmental Impact...  

Energy Savers [EERE]

(NEPA) on the proposed construction, operation, and maintenance of a 115-kilovolt (kV) transmission line and a 138115-kV substation (collectively referred to as the Hooper...

91

Notification of Planned 230kV Outage at Potomac River Generating Station  

Broader source: Energy.gov (indexed) [DOE]

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

92

A frequency domain model for 3 kV dc traction dc-side resonance identification  

SciTech Connect (OSTI)

Frequency-dependent effects in railway traction power systems arise from the impedance of substation and locomotive line filters and the traction line. Harmonic noise from traction drives and substations can excite resonances and produce overcurrent or overvoltage conditions at critical points in the network. In this paper, the harmonic feeding impedances of a 3 kV DC traction system seen from the rectifier substation, locomotive drive converter and pantograph terminals are presented. Several substation and locomotive filters are considered with a frequency-dependent traction line. Resonances attributed to the substation filter, locomotive filter and traction line are separate and distinct, the line introducing poles and zeros in the audio frequency (AF) range which vary in frequency and magnitude with locomotive position.

Hill, R.J. [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering] [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering; Fracchia, M.; Pozzobon, P.; Sciutto, G. [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica] [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica

1995-08-01T23:59:59.000Z

93

AC and lightning performance of fiberglass crossarms aged in 115 kV transmission line  

SciTech Connect (OSTI)

This paper presents the results of an investigation of the electrical performance of 115 kV transmission line fiberglass cross-arm used by Mississippi Power and Light Company. A transmission line fiberglass crossarm removed from service and companion cross-arms outdoors but not in service were examined. The evaluation of electrical performance was based on flashover voltage value at AC voltage and standard lightning impulses as well as under dry and wet conditions. The tests were performed in the Mississippi State University High Voltage Laboratory. The obtained flashover voltages show no large differences in electrical strength of fiberglass crossarms removed from service and those stored outdoors. The Added CFO voltage by fiberglass crossarm to the porcelain suspension insulators is presented versus the length of the fiberglass crossarm for dry and wet conditions.

Grzybowski, S. (Mississippi State Univ., Mississippi State, MS (United States). Dept. of Electrical and Computer Engineering); Jenkins, E.B. (Entergy, New Orleans, LA (United States). Generation and Transmission Group)

1993-10-01T23:59:59.000Z

94

CRYOGENIC SYSTEM FOR A 35 KV/90 MVA SATURATED IRON?CORE SUPERCONDUCTING FAULT CURRENT LIMITER  

Science Journals Connector (OSTI)

A cryogenic system was built as an open system for a 35 kV/90 MVA saturated iron?core superconducting fault current limiter. It consists of an annular cylindrical liquid nitrogen dewar cryogenic pipes sensors valves and a control unit. A HTS dc bias coil was immersed with liquid nitrogen in the dewar. The control circuit constantly monitors the liquid nitrogen level and controls the supply of liquid nitrogen in accordance with the liquid nitrogen level change. Nitrogen vapor was directly released into the environment. Heat loss under different working conditions such as no magnetization current 150 A magnetization current and on?grid condition was measured to evaluate the performance of the system. As compared with no magnetization current of the dc bias coil evaporation of liquid nitrogen increases about 20% under the on?grid condition.

H. Hong; W. Z. Gong; B. Tian; J. Y. Zhang; X. M. Hu; J. Z. Wang; X. Y. Niu; Y. Wang; L. F. Zhang; Y. W. Sun; T. Q. Wu; Y. Xin

2010-01-01T23:59:59.000Z

95

Simulation of ion beam transport through the 400 Kv ion implanter at Michigan Ion Beam Laboratory  

SciTech Connect (OSTI)

The Michigan Ion Beam Laboratory houses a 400 kV ion implanter. An application that simulates the ion beam trajectories through the implanter from the ion source to the target was developed using the SIMION Registered-Sign code. The goals were to have a tool to develop an intuitive understanding of abstract physics phenomena and diagnose ion trajectories. Using this application, new implanter users of different fields in science quickly understand how the machine works and quickly learn to operate it. In this article we describe the implanter simulation application and compare the parameters of the implanter components obtained from the simulations with the measured ones. The overall agreement between the simulated and measured values of magnetic fields and electric potentials is {approx}10%.

Naab, F. U.; Toader, O. F.; Was, G. S. [Department of Engineering and Radiological Sciences, University of Michigan, 2355 Bonisteel Boulevard, Ann Arbor, MI 48109-2104 (United States)

2013-04-19T23:59:59.000Z

96

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

97

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

SciTech Connect (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

98

A way to higher resolution: spherical-aberration correction in a 200 kV transmission electron microscope  

Science Journals Connector (OSTI)

......micrographs, ultramicroscopy 15: 151-172. rical pole-piece dimensions. The 200 kV spherical-aberra- 8 Thust A, Overwijk M H F, coene w M J. and Lentzen M (1996) tion-COrreCted microscope avoids the radiation damage Numerical correction of......

Knut Urban; Bernd Kabius; Max Haider; Harald Rose

1999-01-01T23:59:59.000Z

99

Study on Tubular Busbar Corona Design Optimization of ±660kV HVDC Converter Substation in Qingdao  

Science Journals Connector (OSTI)

The HVDC busbar corona characteristic is the main factor taken into account for choosing busbar of HVDC converter substation. By establishing the calculation models of electric field strength along the busbar surface, ground total electric field strength ... Keywords: ±660 kV HVDC, converter substation, corona characteristics, electromagnetic, tubular busbar optimization

Xu Mingming; Li Kejun; Tan Zhenyu; Niu Lin

2010-06-01T23:59:59.000Z

100

Development of 6.6kV/1.5kA-Class Superconducting Fault Current Limiter  

Science Journals Connector (OSTI)

The authors have developed and tested a 6.6kV/l.5kA-class superconducting fault current limiter, wound with an AC superconducting wire having ... up to 6.6kV were applied to the limiter. The limiter was able to s...

Kenji Tasaki; Kazuyuki Turunaga; Daisuke Ito…

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

BNL test electron beam ion source operation on a 100 kV platform ,,abstract...a...,b...  

E-Print Network [OSTI]

BNL test electron beam ion source operation on a 100 kV platform ,,abstract...a...,b... E. N. Beebe to build an electron beam ion source EBIS that will satisfy the requirements of the relativistic heavy ion program. Development studies continue to be carried out on the BNL test EBIS, a half-length full electron

102

A fiducial detection algorithm for real-time image guided IMRT based on simultaneous MV and kV imaging  

SciTech Connect (OSTI)

The advantage of highly conformal dose techniques such as 3DCRT and IMRT is limited by intrafraction organ motion. A new approach to gain near real-time 3D positions of internally implanted fiducial markers is to analyze simultaneous onboard kV beam and treatment MV beam images (from fluoroscopic or electronic portal image devices). Before we can use this real-time image guidance for clinical 3DCRT and IMRT treatments, four outstanding issues need to be addressed. (1) How will fiducial motion blur the image and hinder tracking fiducials? kV and MV images are acquired while the tumor is moving at various speeds. We find that a fiducial can be successfully detected at a maximum linear speed of 1.6 cm/s. (2) How does MV beam scattering affect kV imaging? We investigate this by varying MV field size and kV source to imager distance, and find that common treatment MV beams do not hinder fiducial detection in simultaneous kV images. (3) How can one detect fiducials on images from 3DCRT and IMRT treatment beams when the MV fields are modified by a multileaf collimator (MLC)? The presented analysis is capable of segmenting a MV field from the blocking MLC and detecting visible fiducials. This enables the calculation of nearly real-time 3D positions of markers during a real treatment. (4) Is the analysis fast enough to track fiducials in nearly real time? Multiple methods are adopted to predict marker positions and reduce search regions. The average detection time per frame for three markers in a 1024x768 image was reduced to 0.1 s or less. Solving these four issues paves the way to tracking moving fiducial markers throughout a 3DCRT or IMRT treatment. Altogether, these four studies demonstrate that our algorithm can track fiducials in real time, on degraded kV images (MV scatter), in rapidly moving tumors (fiducial blurring), and even provide useful information in the case when some fiducials are blocked from view by the MLC. This technique can provide a gating signal or be used for intra-fractional tumor tracking on a Linac equipped with a kV imaging system. Any motion exceeding a preset threshold can warn the therapist to suspend a treatment session and reposition the patient.

Mao Weihua; Riaz, Nadeem; Lee, Louis; Wiersma, Rodney; Xing Lei [Department of Radiation Oncology, Stanford University School of Medicine, Stanford, California 94305-5847 (United States)

2008-08-15T23:59:59.000Z

103

Rural community noise caused by 345/138 kV substation transformer  

Science Journals Connector (OSTI)

Residents 360 m (1200 ft) from a large (6 × 8 × 4.5 m high) 345/138 kV transformer installed in a new power substation in a rural setting complained of its noise emission especially at night. Octave band and 24?h A?weighted noise measurements were made. The 120?Hz sound level was found to be 90 to 105 dB at the transformer surface. Transformer noise emission did not vary significantly with transformer loading or time of day. The distant (360 m) noise level was from 40 to 47 dBA (N?30 to N?45) depending on intervening terrain and time of day. In calm summer air the annoying sound was found to be in the 125?Hz band at the residence beyond a vegitated rise and 250 to 500 Hz for a residence with line?of?sight contact over a shallow depression. The line?of?sight resident's complaint that the noise was greatest at night was corroborated by the 24?h measurement. That noise level was found to be typically 38 dBA from 11 a.m. to 7 p.m. and 45 dBA from 9 p.m. to 6 a.m. It is postulated that the depression accumulated cool air at night thus refracting the sound onto that site. Recommendations for a noise barrier wall was made to the power company operator.

Angelo J. Campanella

1981-01-01T23:59:59.000Z

104

EMI (electromagnetic interference) potential of proposed 115KV line near B-691  

SciTech Connect (OSTI)

The Laser Operated Diamond Turning Machine (LODTM) is housed in Building 691. This facility contains electronic measurement and control systems which could be susceptible to interfering electromagnetic interference (EMI) generated by sources external to B-691. In particular, concern has been expressed that such harmful EMI signals could be produced by the proposed WAPA 115KV feeder line which would be routed approximately 30 feet from the East side of the facility. Also, there has been some concern expressed about the effects of the resulting electromagnetic (EM) fields on personnel in the proximity of the power line. Since it is necessary to measure the EM fields to ascertain if a hazard does indeed exist, and since we in ERD have been performing such field measurements for many years, we were contacted to determine the field levels from the line that might be expected inside and close to B-691. This report describes our approach, equipment and calibration procedures, analysis techniques used, results, and suggestions for future work in related areas. 9 refs., 41 figs.

Latorre, V.R.; Wythe, D.M.

1989-07-27T23:59:59.000Z

105

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

106

KvAP1ORQ MthK3LDC Kv12R9R Supplementary Figure S1: Detailed view of TPenA docked into the 3 bestfit  

E-Print Network [OSTI]

of K2P channel block shown in Figure 1. Piechotta et al. Supplementary Information C2 TEA C4 TButA C5 TPenA C6 THexA C7 THepA C8 TOctA #12;Piechotta et al. Supplementary Information Supplementary Figure been published previously; a Milacet al(2011) b Treptow& Klein (2010). KvAP1ORQKv12R9RMthK3LDCKcsA3FB6

Tucker, Stephen J.

107

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

108

EIS-0399: Final EIS for the Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line Comments/Response  

Broader source: Energy.gov (indexed) [DOE]

9 9 Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line VOLUME 2 COMMENT RESPONSE DOCUMENT September 2008 United States Department of Energy State of Montana Department of Environmental Quality COVER SHEET Responsible Agencies: U.S. Department of Energy (DOE) and Montana Department of Environmental Quality (DEQ) are co-lead agencies; the Bureau of Land Management (BLM), U.S. Department of the Interior, is a cooperating agency. Title: Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399) Location: Cascade, Teton, Chouteau, Pondera, Toole, and Glacier counties, Montana. Contacts: For further information about this Final EIS, contact: Ellen Russell, Project Manager,

109

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

110

Detailed design of a 13 kA 13 kV dc solid-state turn-off switch  

SciTech Connect (OSTI)

An experimental facility for the study of electromagnetic effects in the First Wall-Blanket-shield (FWBS) systems of fusion reactors has been constructed at Argonne National Laboratory (ANL). In a test volume of 0.76 m/sup 3/, a vertical, pulsed 5 kG dipole field (B < 320 kGs/sup -1/) is perpendicular to a 10 kG solenoid field. Power supplies of 2.75 MW at 550 V dc and 5.5 MW at 550 V dc and a solid-state switch rated at 13 kA and 13 kV (169 MW) control the pulsed magnetic fields. The total stored energy in the coils is 2.6 MJ. This paper describes the design and construction features of the solid-state switching circuit which turns off a dc of 13 kA in approximately 82 ..mu..s and holds off voltages of < 13 kV.

Praeg, W.F.

1985-01-01T23:59:59.000Z

111

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

112

EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana , Hettinger, North Dakota , and New Underwood , South Dakota , in Custer and Fallon Counties in Montana, Adams , Bowman , and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

113

The Results of Tests of ASK-100-4UKhL4 Type Asynchronized Compensators at the Beskudnikovo 500 kV Substation  

Science Journals Connector (OSTI)

Two ASK-100-4UKhL4 100 Mvar asynchronized compensators were introduced into operation in the 500 kV Beskudnikovo substation in 2012. The results of systems tests...

L. G. Volodarskii; I. Ya. Dovganyuk; R. D. Mnev…

2014-01-01T23:59:59.000Z

114

EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental  

Broader source: Energy.gov [DOE]

This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

115

16. Recording of Absarption Spectra (Absorption Accessory kit t (55466); 30 kV; 0.08 mA, room normally  

E-Print Network [OSTI]

16. Recording of Absarption Spectra (Absorption Edge) Accessory kit t (55466); 30 kV; 0.08 mA, room set to 30 kV7 16.4. Tabulate counts, I,from 20° (2 8)to 40' at 1' intervals. Fig. 1 8 1 16.5. Locate ktween the K,- and the Kg-line of copper, so that the transmission rate of the Kg-line is very weak while

Browder, Tom

116

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

117

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

SciTech Connect (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

Gusev, S. I. [JSC 'FSK EES' (Russian Federation); Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I. [Scientific-Research Institute of Electric Power Engineering (VNIIE) - Branch of the JSC 'NTTs Elektroenergetiki', (Russian Federation)

2009-09-15T23:59:59.000Z

118

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect (OSTI)

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

119

Quench current degradation in superconducting coil for 6.6 kV/2 fault current limiter  

SciTech Connect (OSTI)

A 6.6 kV/2 kA class fault current limiter that consists of non-inductive superconducting windings was developed and tested. The limiter can deliver continuous power at 2 kArms and limit fault current of more than 20 kA to 4 kA in 6 kV. The limiter recovers to the superconducting state within a few seconds and can perform a fault current limiting operation in 60 seconds after the last limiting operation. After high-voltage operation, however, the quench current of the limiter dropped significantly. This quench current degradation is related to the coil bobbin strain due to helium pressure raised by large ohmic heating in quenching. The degradation is a fatal problem for a fault current limiter if the quench current falls below the operating current because the limiter cannot revert to the normal operation. High Young`s modulus bobbin is effective to remove the coil degradation. They have obtained a fault current limiter without any degradation after repeated limiting operations.

Tasaki, K.; Yazawa, T.; Yoneda, E.S.; Nomura, S.; Maeda, H. [Toshiba Corp., Kawasaki (Japan). Research and Development Center] [Toshiba Corp., Kawasaki (Japan). Research and Development Center; Ohkuma, T.; Nakade, M.; Hara, T. [Tokyo Electric Power Co., Yokohama (Japan). Power Engineering R and D Center] [Tokyo Electric Power Co., Yokohama (Japan). Power Engineering R and D Center

1996-07-01T23:59:59.000Z

120

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed.

Not Available

1993-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Experimental evaluation of a 35 kVA downdraft gasifier  

Science Journals Connector (OSTI)

Energy conversion systems based on biomass are particularly interesting because biomass utilization effectively closes the carbon cycle besides achieving self-sustainability. Biomass is particularly useful for hi...

Ashok Jayawant Rao Keche; Gaddale Amba Prasad Rao

2013-09-01T23:59:59.000Z

122

Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks  

SciTech Connect (OSTI)

An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S. [Electric Power Research Institute (VNIIE) (Russian Federation)

2006-11-15T23:59:59.000Z

123

Design and Simulation of Novel Enhancement Mode 5–20 kV GaN Vertical Superjunction High Electron Mobility Transistors for Smart Grid Applications  

Science Journals Connector (OSTI)

We report on the design, simulations and optimization of a novel enhancement mode 5–20 kV GaN vertical superjunction (SJ) high electron mobility transistor (HEMT). We optimize the space charge in GaN pillars using GaN SJ p–n diode for the best trade-off between breakdown voltage (BV) and specific on-resistance (Ronsp), by varying the pillar dosage, length and width. The resulting GaN SJ field effect transistor (FET) structure is projected to have, for example, Ronsp of 4.2 m? cm2 with BV of 12.4 kV.

Zhongda Li; T. Paul Chow

2013-01-01T23:59:59.000Z

124

HTS dc bias coil for 35 kV/90 MVA saturated iron-core fault current limiter  

Science Journals Connector (OSTI)

A superconductive coil with 141,000 ampere-turns designed magnetizing power, made of 17,600 meters of BSCCO 2223 HTS tapes, was fabricated and tested. This coil was built for a 35 kV/90 MVA saturated iron-core fault current limiter. Computer simulations on the performance of the coil were carried out using ANSYS. The critical current of the superconducting coil and the dc resistance of the coil, including the non-superconducting joints, were investigated. Spatial distribution of the magnetic field was measured and compared with the simulation results. In this paper, we will report the configuration and the key parameters of the coil as well as the experimental and simulation results.

W.Z. Gong; J.Y. Zhang; Z.J. Cao; H. Hong; B. Tian; Y. Wang; J.Z. Wang; X.Y. Niu; J. Qiu; S.H. Wang; Y. Xin

2008-01-01T23:59:59.000Z

125

Type A Accident Investigation Report on the June 25, 1997, Contractor Inspector Fatality on the Satsop-Aberdeen #2 & #3 230 kV Line  

Broader source: Energy.gov [DOE]

On June 27, 1997, I established a Type-A Accident Investigation Board to investigate the June 25, 1997 fatal contractor accident which occurred on BPA?s Satsop-Aberdeen #2 and #3 230-kV transmission lines right-of-way.

126

Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle  

SciTech Connect (OSTI)

The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

Kuz'micheva, K. I.; Merzlyakov, A. S.; Fokin, G. G. [JSC 'R and D Center at Federal Grid Company of the United Power System' (Russian Federation)

2013-05-15T23:59:59.000Z

127

EIS-0323-S1: Sacramento Area Voltage Support Project Supplemental Environmental Impact Statement and Environmental Impact Report, Placer, Sacramento, and Sutter Counties, California  

Broader source: Energy.gov [DOE]

Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas substations.

128

ESS 2012 Peer Review - Low Cost, Manufacturable High Voltage...  

Broader source: Energy.gov (indexed) [DOE]

11 kV 600 kW ESS 6 Comparison of solutions for a 13.8 kV 480 V 100 kVA substation transformer 2 S. Bhattacharya, "15kV SiC IGBT Modules for Grid Scale Power Conversion",...

129

Case Study: Innovative Energy Efficiency Approaches in NOAAs...  

Broader source: Energy.gov (indexed) [DOE]

EEM Energy Efficiency Measure GHG Greenhouse gas Gpm Gallons per minute HPC High performance computing IT Information Technology kV Kilovolt or a thousand volts kW Kilowatt or a...

130

PADHDR Reroute  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dam-Headgate Rock and Parker Dam-Bouse 161-kilovolt (kV) transmission lines along the Colorado River in western Arizona and eastern California due to the poor condition of the...

131

Chapter 1 Purpose of and Need for Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Acronyms. Chapter 1 Purpose of and Need for Action Bonneville Power Administration (BPA) is proposing to build a 500-kilovolt (kV) lattice-steel tower transmission line that...

132

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

existing Tower Road-Alkali 115-kilovolt (kV) transmission line in Gilliam County, Oregon. BPA will construct a tap to allow the Wind Project to interconnect to BPA's transmission...

133

EA-1739: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

(Figure 1-1). This 46-mile, 115-kilovolt1 (kV) transmission line, located between the BPA Bandon Substation and the BPA Rogue Substation in Coos and Curry counties, is old,...

134

Microsoft Word - CX_HatRockEquipmentDisposition.docx  

Broader source: Energy.gov (indexed) [DOE]

station taps PacifiCorp's McNary-Wallula 230-kilovolt (kV) line to serve BPA's Hat Rock Substation. PacifiCorp is in the process of rebuilding the switching station, including...

135

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County...  

Broader source: Energy.gov (indexed) [DOE]

and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from...

136

EIS-0323-S1: Draft Supplement Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's...

137

EIS-0496: San Luis Transmission Project, Alameda, Merced, San...  

Energy Savers [EERE]

proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and...

138

CX-010430: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determination Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06202013 Location(s): Washington Offices(s):...

139

Notices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

100-foot-wide tailrace channel; (7) a substation; (8) a 7,097- foot-long transmission line consisting of a 887-foot-long, 4.160-kilovolt (kV) buried cable from the powerhouse to...

140

EA-1950: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington....

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Northern Wind Project Draft Environmental Assessment Roberts...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Power Administration (Western) Forman-Summit 115 kilovolt (kV) transmission line 7.4 miles north of the Summit Substation. The Project is a federal action under the...

142

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

An existing 13.8KV480V, 1000 kVA pad mounted transformer located on the southeast side of 105-R near the reactor ventilation stack must be relocated prior to stack demolition. The...

143

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

As a result of lightning, the 2500 kVA 13.8kV480V transformer that normally supplies power to the switchgear was damaged. The transformer repair replacement is a lengthy process...

144

Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.  

SciTech Connect (OSTI)

Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

Lee, Jack M.

1992-06-01T23:59:59.000Z

145

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

146

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

147

Testing of a 50 kA, 50 kV current interrupter with I sup 2 t preheating and long recovery voltage  

SciTech Connect (OSTI)

The Confinement Physics Research Facility (CPRF) presently being constructed at Los Alamos in a next generation Reversed Field Pinch (RFP) plasma experiment. An inductive energy transfer system, employing a 50 kA, 50 kV dc current interrupter, is being utilized for initiating the plasma current. These performance requirements (50 kA, 50 kV) had yet to be realized in a reliable switching system, development of this current interrupter system was initiated. A switch test bay with a 50 kA battery bank has been built at Los Alamos to test the interrupter in conditions which will exist in the CPRF experiment. Many switch parameters were measured to provide information on the current interrupting characteristics and reliability. Some of these diagnostics include voltage, current, pre and post I{sup 2}t contact resistance, opening speed and position, arc voltage, and stem temperature. To determine any long term changes, all shots and data channels are computer indexed, and may be easily recalled for review. Extensive testing was performed on Siemens D-10 vacuum interrupter. Test parameter space included 55 kA, 40 kV (per bottle); di/dt of 2250 A/{mu}s, I{sup 2}t of 5 {times} 10{sup 9} amp{sup 2} sec; and 20 kV-200 msec RC recovery decay. Circuit parameters effect opening reliability. Circuit data and the associated testing results will be presented along with long term trends of switch performance under normal'' conditions. 12 figs.

Reass, W.A.; Boenig, H.J.; Melton, J.G. (Los Alamos National Lab., NM (USA))

1989-01-01T23:59:59.000Z

148

EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California  

Broader source: Energy.gov [DOE]

The Department of the Interior’s Bureau of Indian Affairs is preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency.

149

Western Area Power Administration Flatiron-Erie 115-kilovolt Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

65 65 Federal Register / Vol. 60, No. 161 / Monday, August 21, 1995 / Notices biomedical technology, and computational biology. One of the components of these programs deals with correctly assessing the dose to various systems that are exposed to radiation fields during treatment. These systems could range from biomolecules to different tissues and organs. The exposure to both patients and health care providers results from such sources as neutrons, high LET radiation, and low LET radiation such as electrons, x- rays, and gamma rays. In many situations, radiation could be combinations of the various radiation fields listed above. For example, development of improved methods for determination of dose to normal vs. cancerous tissue, and of strategies for maximizing the dose to cancerous tissue

150

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect (OSTI)

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

151

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor  

Broader source: Energy.gov (indexed) [DOE]

1 1 Click to edit Master title style 15 kV Phase Leg Power Modules with SiC MIDSJT Devices Ranbir Singh and Siddarth Sundaresan GeneSiC Semiconductor Inc. ranbir.singh@genesicsemi.com +1 703 996 8200 43670 Trade Center Pl #155; Dulles VA 20166 September 27, 2012 Acknowledgement: The authors thank Dr. Imre Gyuk for funding this work and Dr. Stan Atcitty for technical supervision Sandia National Laboratories is a multi- program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DOE SBIR HV DC Link Grant #SC0008240 2 Phase Leg forms fundamental building block for AC/DC AND DC/AC Conversion

152

EIS-0422: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington, DOE/EIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft

153

Microsoft Word - AlbanyEugene_ROD-MAP_060112.docx  

Broader source: Energy.gov (indexed) [DOE]

Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 1 Bonneville Power Administration's Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap

154

CX-005115: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-005115: Categorical Exclusion Determination Weld Substation Transformer Placement, Greeley, Weld County, Colorado CX(s) Applied: B4.6 Date: 01/07/2011 Location(s): Greeley, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration will install; one-150 megavolt-ampere transformer 230/115-kilovolt (KV2A), two-230-kilovolt power circuit breaker, four-230-kilovolt switches, one-115-kilovolt power circuit breaker, three-115-kilovolt switches, and associated bus, meter, and control equipment. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005115.pdf More Documents & Publications CX-002585: Categorical Exclusion Determination CX-008378: Categorical Exclusion Determination CX-008785

155

GENERATION OF A 5A, 10kV HOLLOW ELECTRON BEAM BY A PIERCE GUN J.J. BARROSO, P.J. CASTRO, J.O. ROSSI, J.A.N. GONALVES, and H. PATIRE JR.  

E-Print Network [OSTI]

GENERATION OF A 5A, 10kV HOLLOW ELECTRON BEAM BY A PIERCE GUN J.J. BARROSO, P.J. CASTRO, J.O. ROSSI experienced by the electron beam propagating across the cavity. Here we describe a Pierce gun used of short-circuits. PULSE GENERATOR VIEW GUN OPERATION The gun cathode voltage is fixed at the nominal value

156

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect (OSTI)

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

157

Fast, accurate, and robust automatic marker detection for motion correction based on oblique kV or MV projection image pairs  

SciTech Connect (OSTI)

Purpose: A robust and accurate method that allows the automatic detection of fiducial markers in MV and kV projection image pairs is proposed. The method allows to automatically correct for inter or intrafraction motion. Methods: Intratreatment MV projection images are acquired during each of five treatment beams of prostate cancer patients with four implanted fiducial markers. The projection images are first preprocessed using a series of marker enhancing filters. 2D candidate marker locations are generated for each of the filtered projection images and 3D candidate marker locations are reconstructed by pairing candidates in subsequent projection images. The correct marker positions are retrieved in 3D by the minimization of a cost function that combines 2D image intensity and 3D geometric or shape information for the entire marker configuration simultaneously. This optimization problem is solved using dynamic programming such that the globally optimal configuration for all markers is always found. Translational interfraction and intrafraction prostate motion and the required patient repositioning is assessed from the position of the centroid of the detected markers in different MV image pairs. The method was validated on a phantom using CT as ground-truth and on clinical data sets of 16 patients using manual marker annotations as ground-truth. Results: The entire setup was confirmed to be accurate to around 1 mm by the phantom measurements. The reproducibility of the manual marker selection was less than 3.5 pixels in the MV images. In patient images, markers were correctly identified in at least 99% of the cases for anterior projection images and 96% of the cases for oblique projection images. The average marker detection accuracy was 1.4{+-}1.8 pixels in the projection images. The centroid of all four reconstructed marker positions in 3D was positioned within 2 mm of the ground-truth position in 99.73% of all cases. Detecting four markers in a pair of MV images takes a little less than a second where most time is spent on the image preprocessing. Conclusions: The authors have developed a method to automatically detect multiple markers in a pair of projection images that is robust, accurate, and sufficiently fast for clinical use. It can be used for kV, MV, or mixed image pairs and can cope with limited motion between the projection images.

Slagmolen, Pieter; Hermans, Jeroen; Maes, Frederik; Budiharto, Tom; Haustermans, Karin; Heuvel, Frank van den [Department of ESAT, Medical Image Computing, Catholic University Leuven, Leuven 3000 (Belgium) and Department of Radiology, Medical Image Computing, Catholic University Leuven, Leuven 3000 (Belgium); Department of Radiotherapy, University Hospitals Leuven, Leuven 3000 (Belgium)

2010-04-15T23:59:59.000Z

158

CX-001411: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11: Categorical Exclusion Determination 11: Categorical Exclusion Determination CX-001411: Categorical Exclusion Determination Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project CX(s) Applied: B2.5 Date: 04/01/2010 Location(s): Idaho Falls, Idaho Office(s): Idaho Operations Office, Nuclear Energy This project increases the Uninterrupted Power Supply (UPS) capacity in the Idaho Falls (IF)-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 kilovolt-amphere (KVA) and 36 KVA) and installing a 225 KVA system. An approximately 15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required

159

2.3-MW Medium-Voltage, Three-Level Wind Energy Inverter Applying a Unique Bus Structure and 4.5-kV Si/SiC Hybrid Isolated Power Modules: Preprint  

SciTech Connect (OSTI)

A high-efficiency, 2.3-MW, medium-voltage, three-level inverter utilizing 4.5-kV Si/SiC (silicon carbide) hybrid modules for wind energy applications is discussed. The inverter addresses recent trends in siting the inverter within the base of multimegawatt turbine towers. A simplified split, three-layer laminated bus structure that maintains low parasitic inductances is introduced along with a low-voltage, high-current test method for determining these inductances. Feed-thru bushings, edge fill methods, and other design features of the laminated bus structure provide voltage isolation that is consistent with the 10.4-kV module isolation levels. Inverter efficiency improvement is a result of the (essential) elimination of the reverse recovery charge present in 4.5-kV Si PIN diodes, which can produce a significant reduction in diode turn-off losses as well as insulated-gate bipolar transistor (IGBT) turn-on losses. The hybrid modules are supplied in industry-standard 140 mm x 130 mm and 190 mm x 130 mm packages to demonstrate direct module substitution into existing inverter designs. A focus on laminated bus/capacitor-bank/module subassembly level switching performance is presented.

Erdman, W.; Keller, J.; Grider, D.; VanBrunt, E.

2014-11-01T23:59:59.000Z

160

July 25, 2012 PRE-BID MEETING FOR SUPPLY AND INSTALLATION OF 2 x 320 KVA  

E-Print Network [OSTI]

in the Seminar Room A-1. The following members were present: Mr. B.V.Sawant . Mr. G.B.Gaikwad Mr. N.07.12 at 1500 hrs. Following questions raised by : Mr.M.N Mujawar and Mr. B.P.Yadav of Accurate Powertech India : Answer: - For 100 TF:- UPS Load 168kW Chiller Load 77 kW Balance other loads 59kW UPS THD less than 5

Souradeep, Tarun

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Microsoft Word - BPA DEIS TOC Abstract Summary.doc  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement July 2010 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Draft Environmental Impact Statement Bonneville Power Administration July 2010 Abstract DEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

162

Microsoft Word - BPA PFEIS Cover Abstract.doc  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement February 2011 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration February 2011 FEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

163

Microsoft Word - Libby Troy FEIS TAC Master 5-7-08.doc  

Broader source: Energy.gov (indexed) [DOE]

Rebuild of the Libby (FEC) to Troy Section of Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration May 2008 Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); U. S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project, DOE/EIS - 0379 State Involved: Montana Abstract: The Libby-Troy transmission line, which is the 17-mile section of the 115-kilovolt (kV) transmission line that extends

164

EA-1478: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

478: Finding of No Significant Impact 478: Finding of No Significant Impact EA-1478: Finding of No Significant Impact Hoover Dam Bypass Project Phase II, Nevada Western Area Power Administration proposes to double-circuit a portion of the Hoover Dam Bypass Project PHase II (Double-Circuiting a Portion of the Hoover-Mead No. 5 and No. 7 230-kilovolt (kv) Transmission LInes with the Henderson-Mead No. 1 230-kV Transmission Line. In addition, a fiber optic cable would be placed as an overhead ground wire on the double-circuited transmission lines form the area of Hoover Dam to Mead Substation. Finding of No Significant Impact Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No. 5 and No. 7 230-kilovolt (kv) Transmission LInes with the Henderson-Mead No. 1 230-kV

165

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

166

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

167

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

168

CX-010110: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus Montrose (HSP-MTR) 345-kilovolt (kV) transmission line located between Montrose and Norwood, Colorado. CX-010110.pdf More Documents & Publications CX-008790: Categorical Exclusion Determination

169

CX-011831: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

170

CX-009197: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

171

EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

172

EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPA’s Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

173

EIS-0294: Sutter Power Project, Sutter County, California  

Broader source: Energy.gov [DOE]

This EIS analyzes Western Area Power Administration's (Western) decision to support Calpine Corporation (Calpine) to construct an electric generating facility and associated 230-kilovolt (kV) transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP).

174

EIS-0443: Project Financing for Southwest Intertie Project- South, Clark, Lincoln, Nye, and White Pine Counties, Nevada  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line.

175

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

176

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

177

898 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices the time needed to review instructions;  

E-Print Network [OSTI]

Transmission Line Project, Proposed Land Use Plan Amendment, Construction and Operation of a New 91-mile 500 kilovolt (kV) Electric Transmission Line from Imperial Valley Substation (in Imperial Co. near the City the continued use of routes in areas containing Naturally Occurring Asbestos and impacts to water quality

178

EIS-0422: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west through Garfield,

179

CX-008716: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

716: Categorical Exclusion Determination 716: Categorical Exclusion Determination CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration The Bonneville Power Administration (BPA) and Tacoma Power (TPWR) have developed a joint plan to convert the microwave transfer trip signals on BPA's Chehalis-Covington 230 kilovolt (kV) line, which includes the 230-kV tap line to TPWR's Cowlitz Substation, from analog to digital. Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx More Documents & Publications CX-006198: Categorical Exclusion Determination

180

CX-000602: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

02: Categorical Exclusion Determination 02: Categorical Exclusion Determination CX-000602: Categorical Exclusion Determination Tillamook-Oceanside, 115-kilovolt Substation Interconnection CX(s) Applied: B4.6 Date: 01/07/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) substation terminal at Bay 6 of BPA's Tillamook Substation in order to accommodate Tillamook Public Utility District's (PUD's) request to interconnect its new Oceanside 115-kV transmission line. Relay and metering devices will compose the new terminal at Bay 6 where BPA will connect the last span of Tillamook PUD's new Oceanside 115-kV line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000602.pdf More Documents & Publications

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

CX-006257: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

257: Categorical Exclusion Determination 257: Categorical Exclusion Determination CX-006257: Categorical Exclusion Determination Ponderosa 500-230 Kilovolt (kV) Transformer Addition CX(s) Applied: B4.6 Date: 06/29/2011 Location(s): Prineville, Oregon Office(s): Bonneville Power Administration The proposed project includes modification of existing substation equipment, installation of a new 500-230-kilovolt (kV) transformer, and an eight acre expansion northwest of the existing yard. The yard expansion is to facilitate the addition of a new 230-kV 2-bay breaker-and-a-half bus, four bays and the new transformer. A new control house would be built to accommodate controls and protection for the new equipment. The existing road to the south would be modified and graveled. All activities would occur on previously disturbed soils within Bonneville Power

182

Microsoft Word - Central Ferry-Lower Monumental ROD.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 Record of Decision March 2011 Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Record of Decision March 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west

183

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 2270 of 26,777 results. 61 - 2270 of 26,777 results. Page Special Topics in NEPA Documentation Selected documents covering Special Topics under NEPA. http://energy.gov/nepa/special-topics-nepa-documentation Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3

184

CX-001048: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

48: Categorical Exclusion Determination 48: Categorical Exclusion Determination CX-001048: Categorical Exclusion Determination Lower Mid-Columbia/Midway - Vantage 230-Kilovolt Transmission Line Upgrade Project CX(s) Applied: B4.6, B4.7, B4.13 Date: 02/23/2010 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Upgrade the lower Mid-Columbia area 230-kilovolt (kV) transmission system in Grant and Benton counties, Washington. The project requires re-conductoring 10.6 miles of the Midway-Vantage 230-kV transmission line, re-terminating the existing Vantage-Columbia 230-kV line at the Vantage Substation, and installing related transmission and communications equipment within the Midway and Vantage substations. Upgrades are needed to mitigate thermal overloads due to Columbia River flow management changes

185

CX-006816: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

816: Categorical Exclusion Determination 816: Categorical Exclusion Determination CX-006816: Categorical Exclusion Determination Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission Line CX(s) Applied: B4.6, B4.10 Date: 09/26/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration In response to the line and load interconnection request submitted by Coos-Curry, Bonneville Power Administration (BPA) proposes to provide and install tap jumpers between BPA?s Fairview-Bandon 115-kilovolt (kV) transmission line and Coos-Curry?s new 115/24.9-kV substation. The tap jumpers would consist of line extensions from the BPA Fairview-Bandon #1 115-kV line to the Coos-Curry conductors terminated on the "H" frame wood

186

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

187

<AVS>  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Antelope Valley Station to Neset Transmission Project Antelope Valley Station to Neset Transmission Project This environmental impact statement (EIS) prepared by the U.S. Department of Agriculture (USDA), Rural Utilities Service (RUS) provides information about the potential environmental impacts of the proposed Antelope Valley Station (AVS) to Neset Transmission Project. This project, proposed by Basin Electric Power Cooperative (Basin Electric), would include a new 345-kilovolt (kV) transmission line connecting the existing AVS, Charlie Creek, Williston, and Neset substations and the newly proposed Judson and Tande 345-kV substations. In addition to the approximately 190 miles of new 345-kV transmission line, the project would also construct two new 345 kV substations (Judson Substation west of Williston and Tande Substation southeast of Tioga), and several miles of 230-kV transmission line to connect the 345-kV transmission line into the existing area system.

188

Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California  

Broader source: Energy.gov (indexed) [DOE]

Section Page S:\COMM\NEPA\TODO \EA1383\EATOC1 -R.DOC 4/1/02 -i- 1.0 INTRODUCTION 1-1 1.1 BACKGROUND 1-1 1.2 SCOPE OF PROJECT 1-2 1.3 PURPOSE AND NEED 1-3 1.4 AGENCY ACTIONS 1-3 1.4.1 Federal 1-3 1.4.1.1 U.S. Department of Energy 1-3 1.4.1.2 U.S. Fish and Wildlife Service 1-4 1.4.2 Other Agenc y Actions 1-4 1.4.2.1 California Energy Commission 1-4 1.4.2.2 California Department of Fish and Game 1-4 1.4.2.3 State Historic Preservation Office 1-5 1.4.2.4 San Diego County 1-5 2.0 PROPOSED ACTION AND ALTERNATIVES 2-1 2.1 NO ACTION ALTERNATIVE 2-1 2.2 PROPOSED ACTION 2-1 2.2.1 Proposed Amendment to Presidential Permit (PP-68) 2-2 2.2.2 Description of Proposed Project Components and Activities 2-3 2.2.2.1 Otay Mesa 230 kV Switchyard 2-3

189

BOX 50005, SE-104 05 STOCKHOLM, SWEDEN, RECEPTION +46 8 673 95 00, FAX +46 8 15 56 70 BESK/VISIT: LILLA FRESCATIVGEN 4A, STOCKHOLM, INFO@KVA.SE HTTP://KVA.SE  

E-Print Network [OSTI]

BOX 50005, SE-104 05 STOCKHOLM, SWEDEN, RECEPTION +46 8 673 95 00, FAX +46 8 15 56 70 BESÃ?K by Patricia K. Kuhl, University of Washington, Seattle, WA, USA and Hon. Dr., Stockholm University, Sweden will be followed by a panel discussion including Hugo Lagercrantz, Karolinska Institutet, Solna, Sweden, Andrew

190

Libby-Troy Line Rebuild Project - July 25, 2008  

Broader source: Energy.gov (indexed) [DOE]

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

191

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Broader source: Energy.gov (indexed) [DOE]

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

192

353Ambio Vol. 32 No. 5, August 2003 Royal Swedish Academy of Sciences 2003 http://www.ambio.kva.se  

E-Print Network [OSTI]

. In order to apply this methodology to ecotourism in low latitude countries, the method has to be extended

193

EIS-0344: Draft Envrionmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Draft Envrionmental Impact Statement 4: Draft Envrionmental Impact Statement EIS-0344: Draft Envrionmental Impact Statement Grand Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project. Bonnewille Power Administration (BPA) would construct a new 500-kilovolt (kV) transmission line that would replace a single-circuit 115-kV transmission line in an exisiting corridor that has multiple transmission lines for most of the project's length. The transmission line would extend between the Grand Coulee 600-kV Switchyard and Bell Substation near Spokane, a distance of 84 miles. Detailed information about the project and its environmental impacts

194

CX-000600: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

600: Categorical Exclusion Determination 600: Categorical Exclusion Determination CX-000600: Categorical Exclusion Determination Supervisory Control and Data Acquisition Upgrades at Bonneville Power Administration's Hungry Horse, Bonneville, and Grand Coulee Substations CX(s) Applied: B4.6 Date: 01/12/2010 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install Supervisory Control and Data Acquisition (SCADA) upgrades at the United States Army Corps of Engineers' Bonneville 115-kilovolt (kV) Switchyard, and the United States Bureau of Reclamation's Grand Coulee 115-kV, 230-kV, and 500-kV Switchyards and Hungry Horse 230-kV Switchyards. The SCADA upgrade at each switchyard will provide BPA the system monitoring and control necessary to

195

CX-000599: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-000599: Categorical Exclusion Determination Flathead Substation Bay Addition - L0307 CX(s) Applied: B4.6 Date: 01/13/2010 Location(s): Flathead County, Montana Office(s): Bonneville Power Administration Flathead Electric Cooperative (FEC) has requested a new 230-kilovolt (kV) point of delivery at Bonneville Power Administration's (BPA's) Flathead Substation to serve FEC's new 230/69-kV transformer and 69-kV system upgrades. FEC is upgrading their 34.5-kV sub-transmission system to 69-kV operation to serve continued load growth in the greater Kalispell, Montana area. In order to accomodate this request, BPA proposes to expand the Flathead Substation yard to convert and existing bay (BAY #15) to connect FEC's new transformer and relocate the equipment from the converted bay to

196

KV-tOOJHfe Metallurgy Department  

E-Print Network [OSTI]

.1. Fracture Testing 24 3.2. Fatigue Testing Using Offshore Load Spectrum .. 25 3.3. Brazing and Soldering 25 3 Research on Advanced Ceramic Materials 37 4.8. Developaent and Testing of Oxygen Sensors 38 FUEL ELEMENTS concentrated mainly on nuclear metallurgy to covering a number of different areas within ma- terials science

197

CX-003611: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Categorical Exclusion Determination 1: Categorical Exclusion Determination CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) has a need to replace old and worn spacer-dampers on approximately 78 miles of the Schultz - Raver Number 3 and 4 500-kilovolt (kV) transmission lines. Manned aerial carts that ride on the transmission line conductors would be used to change out the spacers. The carts would be placed on the transmission line by helicopter prior to line crews accessing the carts to perform the work. New spacers would be delivered by helicopter to the carts. Once the old spacers are

198

Microsoft Word - GrandCoulee_FinalEA_CommentResponses.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1679 December 2011 Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Revision Sheet for the Environmental Assessment 2 SUMMARY This revision sheet documents the changes to be incorporated into the Grand Coulee's Third Powerplant 500-kilovolt (kV) Transmission Line Replacement Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On May 2, 2011, the Preliminary EA was sent to agencies and interested parties.

199

EA-1588: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

88: Final Environmental Assessment 88: Final Environmental Assessment EA-1588: Final Environmental Assessment Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation The U.S. Army Corps of Engineers proposes to construct a new vehicle bridge across the American River Downstream about 800 feet east and 1,100 feet west of Folsom Dam, which will be located in an existing right-of-way currently occupied by the Sacramento Municipal Utility District double-circuit Orangevale-Lake/Whiterock-Orangevale 230-kilovolt and 12-kilovolt transmission lines. Finding on No Significant Impact for the Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation, EA-1588 (January 2007) More Documents & Publications EA-1588: Finding of No Significant Impact

200

CX-006483: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

83: Categorical Exclusion Determination 83: Categorical Exclusion Determination CX-006483: Categorical Exclusion Determination Balancing Authority Area Service Agreement with Lane Electric Cooperative, Inc. CX(s) Applied: B4.1 Date: 08/03/2011 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration The Project consists of two 500 kilowatt (kW) photovoltaic solar inverters totaling 1000 kW. The Project interconnects to Lane Electric Cooperative, Inc.?s (LEC) 12.5-kilovolt (kV) AB Circuit, then to LEC?s 34.5/12.5-kV Fox Hollow Substation. The point of interconnection of LEC?s Fox Hollow Substation to the Federal Columbia River Transmission System is at Bonneville Power Administration's (BPA) 115/34.5-kV Eugene Substation via LEC?s 34.5-kV Fox Hollow-Eugene Circuit. The proposed agreement would

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Curecanti-Lost Canyon 230-kV Transmission Line Routine Maintenance of Right-of-Way Roads La Plata, Montezuma, Dolores, San Miguel, and Montrose Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus- Montrose (HSP-MTR) 345-kilovolt (leV) Transmission Line located between Montrose and Norwood, Colorado. The project will provide safe access to transmission line structures 0 to 194 (approximately 110 miles). Also, Westem proposes to perform routine maintenance between structures 40/1 to 59/5 of the Curecanti-Lost Canyon (CCI-LCN) 230-kV Transmission Line. The

202

EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

1: Notice of Intent to Prepare an Environmental Impact 1: Notice of Intent to Prepare an Environmental Impact Statement EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the proposed construction, operation, and maintenance of a 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would be located adjacent to PacifiCorp's existiog 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. The new 115-kV single-circuit BP A transmission line would exlend generally north and east from these

203

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

204

Draft Environmental Impact Statement Klondike III/Biglow Canyon Wind Integration Project  

Broader source: Energy.gov (indexed) [DOE]

Summary S-1 Summary S-1 Summary In this Summary: * Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the draft Environmental Impact Statement (EIS) prepared for the Klondike III/Biglow Canyon Wind Integration Project proposed by the Bonneville Power Administration (BPA). The project includes constructing a new double-circuit 230-kilovolt (kV) transmission line in northern Sherman County, Oregon. The new line would connect the Klondike III Wind Project and the Biglow Canyon Wind Farm to BPA's existing John Day 500-kV Substation. The project would also require expansion of BPA's existing John Day 500-kV Substation and a new 230-kV substation to integrate the two wind projects. As a federal agency, BPA is required by the National Environmental Policy Act

205

Microsoft Word - PonderosaSub_TransformerAdd_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Amy Freel - TEP TPP 1 Amy Freel - TEP TPP 1 Proposed Action: Ponderosa 500-230 kilovolt (kV) Transformer Addition Budget Information: 00276365 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions/modifications to electric power transmission facilities within previously developed Facility area..." Location: Prineville, Crook County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, installation of a new 500-230-kV transformer, and an eight acre expansion northwest of the existing yard. The yard expansion is to facilitate the addition of a new 230-kV 2-bay breaker-and-a-half bus, four bays and the new transformer. A new control

206

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

207

EIS-0451: Hooper Springs Project, Caribou County, Idaho | Department of  

Broader source: Energy.gov (indexed) [DOE]

1: Hooper Springs Project, Caribou County, Idaho 1: Hooper Springs Project, Caribou County, Idaho EIS-0451: Hooper Springs Project, Caribou County, Idaho Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. Public Comment Opportunities None available at this time. Documents Available for Download March 11, 2013 EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho March 8, 2013

208

CX-000601: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

601: Categorical Exclusion Determination 601: Categorical Exclusion Determination CX-000601: Categorical Exclusion Determination New Revenue Meters at Central Lincoln's Florence and Berrydale Substations CX(s) Applied: B4.6 Date: 01/07/2010 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration plans to upgrade revenue metering at Central Lincoln People's Utility District's (Central Lincoln) Florence and Berrydale Substations to 115-kilovolt (kV). Bonneville will retire the 12.5-kV revenue metering at Central Lincoln's Florence, Berrydale, and Heceta Beach Substations once acceptance tests of the new 115-kV metering at Florence and Berrydale Substations are completed. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000601.pdf More Documents & Publications

209

Categorical Exclusion (CX) Determination  

Broader source: Energy.gov (indexed) [DOE]

Pronghorn Gas Plant 115 kV transmission line. Pronghorn Gas Plant 115 kV transmission line. Description of Proposed Action: Western received an interconnection request from Upper Missouri G & T Electric Cooperative Inc's (Upper Missouri) member Roughrider Electric Cooperative, Inc. (Roughrider) to interconnect at Western's Belfield Substation in November of2010. The request for interconnection is for a line bay addition to the existing 230-kilovolt (kV) ring bus at Western's Belfield substation; as well as the installation of a revenue meter at a proposed new substation, South Heart substation, owned and operated by Upper Missouri. In order to bring the power into Western's substation, Upper Missouri and Roughrider must interconnect their Pronghorn substation, located in SEC 17 T140N R99W, to the proposed South Heart substation, located in

210

CX-005844: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-005844: Categorical Exclusion Determination Peninsula Light Company Line and Load Interconnection Request L0308 CX(s) Applied: B4.6 Date: 05/05/2011 Location(s): Mason County, Washington Office(s): Bonneville Power Administration Peninsula Light Company (PLC) submitted a request to Bonneville Power Administration (BPA) for an emergency 115-kilovolt (kV) connection to BPA?s Shelton-Kitsap #2 115-kV line in order to serve its load in the event of a double circuit loss at the Tacoma Narrows Crossing. In response to PLC?s request, BPA is proposing to construct a double tap scheme on BPA?s Shelton-Kitsap #2 115-kV line at structures 18/1 and 18/2. This proposal would allow PLC an emergency connection to serve its load over Tacoma

211

EA-1456: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

56: Final Environmental Assessment 56: Final Environmental Assessment EA-1456: Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Loveland, Colorado Western Area Power Administration (Western) is proposing to upgrade the existing Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines and making modifications to Western's existing Miracle Mile, Cheyenne and Ault Substations to accommodate the 230-kV circuits. A new Snowy Range Substation would also be build near Laramie, Wyoming. DOE/EA-1456; Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Western Area Power

212

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

213

CX-006889: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-006889: Categorical Exclusion Determination Bristol to Groton Transmission Line Upgrade Project CX(s) Applied: B4.11 Date: 10/11/2011 Location(s): South Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Western Area Power Administration (WAPA) Bristol to Groton 115 kilovolt (kV) transmission line is to be upgraded in association with the Just Wind Napoleon Wind Farm. The Just Wind Napoleon Wind Farm will produce 367 megawatts (MW) when complete. Plans call for production of 100 MW at the end of 2010, with the remaining 267 MW coming online at a later date. The existing 115-kV conductor will need to be replaced with a new 795 MCM (thousands of circular mills) 115-kV conductor line before the full 367 MW

214

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and  

Broader source: Energy.gov (indexed) [DOE]

36: I-5 Corridor Reinforcement Project, Multnomah County, 36: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash., to a new 500-kV substation near Troutdale, Ore. After initially identifying a large number of route segments, BPA combined those segments into four action alternatives (each with options): West, Central, East, and Crossover. The action alternatives and the No Action Alternative are analyzed in the draft EIS. The alternatives vary in length and include both existing and new

215

CX-007148: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

48: Categorical Exclusion Determination 48: Categorical Exclusion Determination CX-007148: Categorical Exclusion Determination Gila Substation Electrical Equipment Replacement CX(s) Applied: B4.6 Date: 05/03/2011 Location(s): Yuma County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace a 34.5-kilovolt (kV) circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads and vehicles such as backhoes, dozers, bucket trucks, crew trucks and pickup trucks to bring personnel and equipment to the work areas. This work is

216

CX-005383: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

383: Categorical Exclusion Determination 383: Categorical Exclusion Determination CX-005383: Categorical Exclusion Determination Elliot Substation Construction and Transmission Line 43.8kV Transmission Line CX(s) Applied: B4.11 Date: 03/02/2011 Location(s): Elliot, North Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, North Dakota to be owned and operated by Western under Western's Valley City to Forman 115-kilovolt (kv)transmission line in addition to 8 miles of new 43.8-kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005383.pdf More Documents & Publications

217

EA-1470: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-1470: Finding of No Significant Impact Harry Allen-Mead 500 kV Transmission Line Project, Nevada Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). Based on the EA, BLM, and Western errata, Western has determined that the proposed transmission line would not result in any significant environmental impacts, and the preparation of an environmental impact statement (EIS) will not be required. Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project, DOE/EA-1470 (October 2004)

218

CX-008714: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8714: Categorical Exclusion Determination 8714: Categorical Exclusion Determination CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace 18 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) as well as cross arms on three other structures along the subject transmission lines. Microsoft Word - CX-Alvey-FairviewAlvey-MartinCreek-DrainWoodPolesFY12_WEB.doc More Documents & Publications CX-010344: Categorical Exclusion Determination

219

EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

50: Notice of Intent To Prepare an Environmental Impact 50: Notice of Intent To Prepare an Environmental Impact Statement EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada The Bureau of Land Management (BLM) Wyoming State Office, Cheyenne, Wyoming, intends to prepare an Environmental Impact Statement (EIS) analyzing the impacts of a right-of-way (ROW) application for the TransWest Express 600-kilovolt (kV) Direct Current Transmission Project (Project) and potential land use plan amendments Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada

220

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Midway Substation 230-kV Upgrades Midway Substation 230-kV Upgrades El Paso County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to modify components within the Midway Substation 230-kilovolt (kV) yard to accommodate upgrades being performed by Tri-State Generation and Transmission Association, Inc. Western's proposed modifications would occur entirely within the fenced perimeter of the substation located in Township 17S, Range 65W, Section 20 of El Paso County, Colorado. Western would re-conductor the main and transfer strain buses with I ,272 kcmil (thousands of circular mils) Aluminum Conductor Steel Supported (ACSS) at the Midway Substation. The duplex I ,590 kcmil All Aluminum Conductor (AAC) jumpers on each bay in the substation would be installed. The

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Categorical Exclusion (CX) Determination  

Broader source: Energy.gov (indexed) [DOE]

Reroute of Jamestown-Grand Forks 230 kV transmission line near Hannaford, North Reroute of Jamestown-Grand Forks 230 kV transmission line near Hannaford, North Dakota. Description of Proposed Action: Western is planning to reroute approximately two miles of its Jamestown-Grand Forks 230-kilovolt (kV) transmission line. The reroute will occur in SECI and 11 T144N R60W in Griggs County, North Dakota. The purpose of moving the transmission line is to relocate the line out of a wetland to a more upland site. Construction will occur late summer or fall of2012. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.13: Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric power lines approximately 20 miles in length or less to enhance environmental and land use values. Such

222

CX-007164: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

164: Categorical Exclusion Determination 164: Categorical Exclusion Determination CX-007164: Categorical Exclusion Determination Prescott-Pinnacle Peak & Pinnacle Peak-Rogers Aerial Marker Ball Addition CX(s) Applied: B1.9 Date: 01/07/2011 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes removing two existing marker balls at structures 0/4 & 0/5 of the Pinnacle Peak-Rogers #1 & #2 230-kilovolt (kV) double circuit transmission line & installing aerial marker ball equipment on all static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kV transmission line on the north side of structures 216/1-216/3 & the southeast side of structures 0/3-0/5 on the Pinnacle Peak-Rogers #1 & #2 230-kV double circuit transmission line. The diverters will be installed

223

EA-1665: Final Environmental Assessment and Finding of No Significant  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment and Finding of No Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV Transmission Line Rebuild Project, Mohave County, Arizona For more information, contact: Ms. Linette King Desert Southwest Region Western Area Power Administration P.O. Box 6457 Phoenix, AZ 85005-6457 Telephone: 602-605-2434 Fax: 602-605-2630 Electronic mail: lking@wapa.gov The Western Area Power Administration (Western) plans to rebuild a 26.2-mile-long portion of the existing Davis-Kingman Tap 69-kilovolt (kV) Transmission Line located in Mohave County,Arizona. The existing Davis-Kingman Tap 69-kV Transmission Line originates in Bullhead City, Arizona, at the Davis Dam Switchyard and extends northwest of Kingman, Arizona, four

224

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

225

Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

United States. Bonneville Power Administration

2006-10-25T23:59:59.000Z

226

CX-003624: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

624: Categorical Exclusion Determination 624: Categorical Exclusion Determination CX-003624: Categorical Exclusion Determination Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/12/2010 Location(s): Gray's Harbor County, Washington Office(s): Bonneville Power Administration Replacement of twenty 22-L structures on the Satsop-Aberdeen Number 2 230-kilovolt (kV) transmission line. The project work would involve removal of the existing towers and building replacement towers, replacing insulators, and attaching the existing conductor to the new towers. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003624.pdf More Documents & Publications CX-003025: Categorical Exclusion Determination CX-001179: Categorical Exclusion Determination

227

CX-008790: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). CX-008790.pdf More Documents & Publications CX-009411: Categorical Exclusion Determination

228

CX-005379: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5379: Categorical Exclusion Determination 5379: Categorical Exclusion Determination CX-005379: Categorical Exclusion Determination Insulator Replacement in Agricultural Lands Along the Grand Coulee-Bell Number 3/Grand Coulee-Westside No. 1 Double Circuit 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/02/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace worn insulators on sections of the Grand Coulee-Bell Number 3/Grand Coulee-Westside Number 1 double circuit 230-kilovolt (kV) transmission line. This portion of the transmission line is located in Lincoln County, Washington, in BPA?s Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed below.

229

CX-008377: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

377: Categorical Exclusion Determination 377: Categorical Exclusion Determination CX-008377: Categorical Exclusion Determination Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration's (Western) Casper Field Office proposes to replace deteriorating poles on 18 wood H-frame structures along its Alcova-Casper North 115 kilovolt (kV) transmission line. The project structures are located on the transmission line between Township 33 North, Range 80 West, Section 12 and Township 30 North, Range 82 West, Section 18, 6th Principle Meridian near Casper, Wyoming in Natrona County. CX-008377.pdf More Documents & Publications CX-010551: Categorical Exclusion Determination

230

CX-008380: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-008380: Categorical Exclusion Determination Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230 kilovolt (kV) transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town of Nunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of way easement.

231

EIS-0422: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

422: Final Environmental Impact Statement 422: Final Environmental Impact Statement EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.

232

EIS-0159: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Record of Decision 9: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

233

EIS-0422: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.

234

CX-006819: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) will perform routine maintenance and replacement of aging wood pole transmission line support structures, including all hardware and guy support structures on the Centralia Tap to Chehalis-Covington No. 1 230-kilovolt (kV) transmission line. The transmission line is owned and operated by Trans Alta and BPA maintains the line at Trans Alta?s expense. Trans Alta is contracting with BPA to complete the maintenance work.

235

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 9190 of 29,416 results. 81 - 9190 of 29,416 results. Download CX-006302: Categorical Exclusion Determination Colville-Republic Rebuild Project CX(s) Applied: B1.3, B4.6 Date: 07/21/2011 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006302-categorical-exclusion-determination Download CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-003611-categorical-exclusion-determination Download CX-004257: Categorical Exclusion Determination Replace Spacer Dampers Along the Slatt-John Day Number 1 500-Kilovolt

236

CX-010098: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Categorical Exclusion Determination 8: Categorical Exclusion Determination CX-010098: Categorical Exclusion Determination Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration (WAPA) proposes to install bird discouragers on a portion of the PHX-LOB 230-kV (kilovolt) transmission line. Access is via existing rural and transmission line access roads. Birds perching on structures are causing line faults and tripping the line out of service. The purpose of the project is to insure the continued safe and reliable operation of the bulk power system by reducing or eliminating faults due to bird activity along the line.

237

EIS-0308: Record of Decision and Floodplain Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

8: Record of Decision and Floodplain Statement 8: Record of Decision and Floodplain Statement EIS-0308: Record of Decision and Floodplain Statement Interconnection of the Southpoint Power Plant with the Wester Area Power Administration's Parker-Davis No. 1 and No. 2, 230-kilovolt Transmission Lines Western has determined that no significant environmental impacts will result from construction, operation and maintenance of Calpine Corporation's Southpoint Power Plant, the two natural gas pipelines, or the approximately 7 miles of high voltage transmission lines, or from the upgrade of the Parker-Davis No. 1 230-kilovolt (kV) transmission line. Therefore, Western has decided to provide an interconnection with the plant and Western's transmission system in west central Arizona. However, Calpine has yet to obtain a permit from the Bureau of Land Management (BLM)

238

EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

: Notice of Intent to Prepare an Environmental Impact : Notice of Intent to Prepare an Environmental Impact Statement EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana BPA intends to prepare an EIS on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. DOE/EIS-0379, Bonneville Power Administration, Notice of Intent to prepare

239

EIS-0159: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

159: Record of Decision 159: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

240

CX-006303: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

03: Categorical Exclusion Determination 03: Categorical Exclusion Determination CX-006303: Categorical Exclusion Determination Interconnection of the Pronghorn Gas Plant 115 Kilovolt Transmission Line CX(s) Applied: B4.11 Date: 07/14/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region In order to bring power into Western's substation, Upper Missouri and Roughrider must interconnect their Pronghorn substation, located in SEC 17 T140N R99W, to the proposed South Heart substation, located in SEC20 T140N R98W, and then the South Heart substation to Western's Belfield substation, located in SEC20 T140N R98W. This would be accomplished by building a roughly eight mile stretch of 115-kilovolt (kV) transmission line east-west between Pronghorn and South Heart, and a north-south tie-line of less than

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 30240 of 31,917 results. 31 - 30240 of 31,917 results. Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008713: Categorical Exclusion Determination 2012 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008713-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV),

242

CX-008399: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

99: Categorical Exclusion Determination 99: Categorical Exclusion Determination CX-008399: Categorical Exclusion Determination Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) will repair erosion damage at Structure No. 110-3 of the Dave Johnston to Stegall 230 kilovolt (kV) transmission line located near southeast Torrington. Wyoming. Flood flows along the North Platte River in 2011 migrated the active channel bank towards Structure No. 110-3. The potential exists for future channel meandering to underline the foundation supports of the 80 foot steel lattice structure. To mitigate this potential, Western proposes to

243

CX-008378: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8378: Categorical Exclusion Determination 8378: Categorical Exclusion Determination CX-008378: Categorical Exclusion Determination Archer 230 Kilovolt Bay Addition for New Point of Delivery - Stage 07 CX(s) Applied: B4.6 Date: 03/08/2012 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region Tri-State Generation and Transmission Association, Inc. (Tri-State), has requested an interconnection to Western Area Power Administration's (Western) Archer 230/115-Kilovolt (kV) Substation (Archer Substation). The Archer Substation is a Designated Point of Delivery from Western to Tri-State as set forth in Exhibit A of Contract No. 87-LAO-172 (TS-89-0005), Finn Electric Service (Contract). CX-008378.pdf More Documents & Publications CX-010891: Categorical Exclusion Determination

244

CX-008381: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

381: Categorical Exclusion Determination 381: Categorical Exclusion Determination CX-008381: Categorical Exclusion Determination Big Thompson to Flatiron 13.8 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace four existing single wood pole structures along the Big Thompson to Flatiron 13.8 kilovolt (kV) transmission line. The structures are located along a previously disturbed area adjacent to the Horsetooth Supply Canal in Larimer County, Colorado. The structures will be replaced in-kind with single wood poles of the same height, hardware, configuration, and in the same location. CX-008381.pdf More Documents & Publications

245

Data:Af9aae14-bfe0-4801-b03b-10ed3f92cdc7 | Open Energy Information  

Open Energy Info (EERE)

aae14-bfe0-4801-b03b-10ed3f92cdc7 aae14-bfe0-4801-b03b-10ed3f92cdc7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2013/05/01 End date if known: Rate name: LP - Large Power Service Sector: Industrial Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. Transmission Voltage Discount (for delivery at 69 kV or higher): $2.342 per kVa per month for all kVa of Billing Demand.

246

Data:Ab19a097-e4a5-4a7d-84d3-8637e2963a7c | Open Energy Information  

Open Energy Info (EERE)

9a097-e4a5-4a7d-84d3-8637e2963a7c 9a097-e4a5-4a7d-84d3-8637e2963a7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grayson Rural Electric Coop Corp Effective date: 2012/06/01 End date if known: Rate name: Schedule 4- Large Power Service Sector: Industrial Description: Available to consumers located on or near the Cooperative's facilities for Commercial service. Consumers shall contract for a definite amount of electrical capacity in kilovolt-amperes which shall be sufficient to meet normal maximum requirements but in no case shall the capacity contracted be less than 50 KVA. The Cooperative may not be required to supply capacity in excess multiples of 25 KVA.

247

Data:Ea9c8db7-2e8a-4b9b-a30f-26e3cdf78e0c | Open Energy Information  

Open Energy Info (EERE)

c8db7-2e8a-4b9b-a30f-26e3cdf78e0c c8db7-2e8a-4b9b-a30f-26e3cdf78e0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Pitcairn, Pennsylvania (Utility Company) Effective date: End date if known: Rate name: Large Power Service Sector: Commercial Description: Availability for commercial or industrial service. Customers shall contract for a definite amount of electrical capacity in kilovolt-amperes which shall be sufficient to meet normal maximum requirements but in no case shall the capacity contracted for be less than 50 kva. The Utility may not be required to supply capacity in excess of that contracted for except by mutual agreement. Contracts will be made in multiples of 25 kva.

248

25 kV Superconducting Fault Current Limiter  

Science Journals Connector (OSTI)

Our technological progress in die field of superconductivity over the last ten years made possible the manufacture of industrial lengths of conductors, consisting of NbTi ultra-fine filaments, embedded in a Cu-30...

T. Verhaege; J. P. Tavergnier; A. Février…

1990-01-01T23:59:59.000Z

249

500 kV transmission line design and fault analysis.  

E-Print Network [OSTI]

??To be able to keep up with energy demands new transmission lines need to be designed and built. Design and planning is a long process… (more)

Haskovic, Mensur

2012-01-01T23:59:59.000Z

250

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

251

EA-1591: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1591: Finding of No Significant Impact Palisades - Goshen Transmission Line Reconstruction Project The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan

252

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

253

EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EIS to assess the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line that would extend from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection facility that would connect with LVE's existing transmission system in northeastern Caribou County. The proposed new transmission line would be about 22 to 33 miles depending on the route alternative or option.

254

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

255

Microsoft Word - CX-Hatwai-DworshakSpacerReplacementFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

September 24, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: 2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Hatwai-Dworshak No. 1 500-kV transmission line project is located in Clearwater and Nez Perce counties, Idaho, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed Table 1:

256

CX-007819: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-007819: Categorical Exclusion Determination Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) and U.S. Bureau of Reclamation require a permanent solution to the inherent hazards of large blocks of ice forming on the Yellowtail Dam on the Bighorn River. In recent years, ice blocks have formed on the dam face and are falling on to the existing configuration of the Yellowtail 115 kilovolt (kV), 230-kV tie lines, and electrical equipment at the Power Plant, causing irreparable damage. CX-007819.pdf More Documents & Publications EA-1617: Final Environmental Assessment

257

Microsoft Word - G0418 Mariah Wind CX  

Broader source: Energy.gov (indexed) [DOE]

Kevlyn Mathews Kevlyn Mathews Project Manager - TPCV-TPP-4 Proposed Action: Mariah Wind, LLC Small Generator Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment Location: Boardman, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate Mariah Wind, LLC's 20 megawatt wind project into BPA's balancing authority in response to Mariah Wind LLC's small generator interconnection request. The proposed point of interconnection is at Columbia Basin Electric Cooperative's (CBEC) 69-kilovolt (kV) Sand Hollow Tap line, which is connected to BPA's Boardman-Ione 69-kV line. Metering equipment and telemetry gear will be provided by BPA and will be installed at the applicant's collector substation and at BPA's

258

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 CX-007736: Categorical Exclusion Determination Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy December 7, 2011 CX-007407: Categorical Exclusion Determination Advanced Floating Turbine CX(s) Applied: A9 Date: 12/07/2011 Location(s): Ohio Offices(s): Golden Field Office December 7, 2011 CX-007403: Categorical Exclusion Determination State of New Hampshire Energy Efficiency and Conservation Block Grant CX(s) Applied: B5.19 Date: 12/07/2011 Location(s): New Hampshire Offices(s): Golden Field Office December 7, 2011 CX-007401: Categorical Exclusion Determination

259

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Broader source: Energy.gov (indexed) [DOE]

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

260

EIS-0427: EPA Notice of Availability of a Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of a Final Environmental EPA Notice of Availability of a Final Environmental Impact Statement EIS-0427: EPA Notice of Availability of a Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona EPA announces the availability of the Final Environmental Impact Statement for the Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona. The proposal is to develop a Wind Energy Generating Facility up to 500 Megawatts; (2) a 345 Kilovolt (kV) Electrical Transmission Tie-Line; and (3) a 345-kV Electrical Interconnection Switchyard, Coconino County, AZ. Review Period Ends: 07/09/2012. EIS-0427-EPANOA-FEIS-2012.pdf More Documents & Publications EIS-0414: EPA Notice of Availability of a Final Environmental Impact

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

262

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Broader source: Energy.gov (indexed) [DOE]

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

263

EA-1636: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project The Bonneville Power Administration (BPA) has proposed replacing wood poles and associated structural components for two of BPA's existing transmission lines that generally share the same transmission line right-of-way - the 115-kilovolt (kV) Albany-Burnt Woods No. 1 transmission line and a portion of the 230-kV Santiam-Toledo No. 1 transmission line, both of which are located in Linn, Benton, and Lincoln Counties, Oregon. DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009) More Documents & Publications EA-1636: Mitigation Action Plan EA-1636: Finding of No Significant Impact

264

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Blue Ridge Microwave Site Upgrade Project Blue Ridge Microwave Site Upgrade Project Grand and Summit Counties, Colorado A. Bl'ief Description of Proposal: Western Area Power Administration (Western) proposes three maintenance actions within previously disturbed or developed areas to upgrade electric service and improve system reliability for the Blue Ridge Microwave Site (Site) in Grand County, Colorado. Western's proposed actions are: installation of a new electric service distribution arrangement at the Site, replacement of three defective single pole wooden structures on the Green Mountain-Blue Ridge (GM-BLR) 2.4-kilovolt (kV) distribution line, and removal of trees to improve Western's microwave line-of-sight path. * Western's GM-BLR 2.4-kV distribution line provides electric service to several communication.

265

CX-007143: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7143: Categorical Exclusion Determination 7143: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

266

CX-007131: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

267

CX-007156: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7156: Categorical Exclusion Determination 7156: Categorical Exclusion Determination CX-007156: Categorical Exclusion Determination New Waddell-Raceway-Westwing Structure Replacement CX(s) Applied: B4.6, B4.13 Date: 03/11/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to remove an existing three-pole turning structure (3/1 B) on the existing Raceway-Westwing 230-kilovolt (kV) Transmission Line, add a new replacement three-pole turning structure (also 3/1 B), and move equipment to a bay constructed by Arizona Public Service (APS) within the existing Raceway Substation in order to accommodate APS's new transmission line and substation equipment. APS intends to use the bay currently occupied by the Raceway-Westwing 230-kV Transmission Line for their new

268

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

269

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

01 - 6310 of 26,764 results. 01 - 6310 of 26,764 results. Download Semiannual Report to Congress April 1, 2008- September 30, 2008 Office of Inspector General Semiannual Report to Congress, DOE/IG-SAR-10-08 http://energy.gov/ig/downloads/semiannual-report-congress-april-1-2008-september-30-2008 Download Independent Activity Report, Los Alamos Site Office- April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment [HIAR-LANL-2011-11-18] http://energy.gov/hss/downloads/independent-activity-report-los-alamos-site-office-april-2012 Page EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV

270

CX-007147: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

147: Categorical Exclusion Determination 147: Categorical Exclusion Determination CX-007147: Categorical Exclusion Determination Flagstaff Substation Breaker Replacement & Control Cable Addition CX(s) Applied: B2.5 Date: 02/18/2011 Location(s): Coconino County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on removing four existing 345-kilovolt (kV) circuit breakers and installing four new 362-kV circuit breakers as well as adding new power and control cables in existing cable trenches to the control building. Excavation of the old trench to a minimum depth of 18 inches and 3 feet wide will be required. The disturbed ground will be use as backfill. The proposed action within the fenced area of the Flagstaff Substation is necessary to maintain the safety and reliability of the bulk electrical

271

CX-006586: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-006586: Categorical Exclusion Determination Integration of G0387 Energetics Solar Integration Project CX(s) Applied: B1.7, B4.6 Date: 09/01/2011 Location(s): Lake County, Oregon Office(s): Bonneville Power Administration Energetics, LCC has requested to integrate its 10 Megawatt Christmas Valley Solar (Project) generation resource into Bonneville Power Administration's (BPA) balancing authority. The new generation resource would interconnect into Midstate Electric Cooperative?s (MEC) 24.9-kilovolt (kV) distribution system at MEC?s Christmas Valley Substation which connects to MEC's Christmas Valley - Fort Rock 115-kV transmission line located in Lake County, Oregon. Project generation would subsequently be integrated onto

272

Microsoft Word - PearlSubExpansion_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz - TEP-CSB-2 Proposed Action: Pearl Substation 500-kilovolt (kV) #6 Bay Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, the addition of a new 500-kV Bay 6, and a one-half acre yard expansion in the southwest corner of the substation. The yard expansion area is within BPA property, consists of mowed grass, and is to facilitate a 40 square foot addition to the Pearl Control House

273

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Danger Tree Management on Green Mountain to Kremmling 69-kV Transmission Line Danger Tree Management on Green Mountain to Kremmling 69-kV Transmission Line Summit and Grand Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to survey and inspect all areas along the Green Mountain to Kremmling 69-kilovolt (k V) transmission line to conduct routine vegetation management inspection and danger tree removal. Trained crews will measure electrical clearance distances between the conductor and tree branches and cut down any trees that meet or exceed the allowable clearance distance. Any "danger" trees and vegetation that constitute an electrical hazard to the lines will be removed. Individual trees will be cut, lopped, and scattered within the existing right-of-way (ROW). Also proposed is routine maintenance to clear

274

EA-1912: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

275

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

276

EIS-0474: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

4: Notice of Intent to Prepare an Environmental Impact 4: Notice of Intent to Prepare an Environmental Impact Statement EIS-0474: Notice of Intent to Prepare an Environmental Impact Statement Proposed Southline Transmission Line Project in New Mexico and Arizona and Possible Land Use Plan Amendments The Department of the Interior's Bureau of Land Management and Department of Energy's Western Area Power Administration as joint lead agencies announce their intent to prepare an EIS to analyze the potential impacts of a proposed 345-kilovolt (kV) and 230-kV transmission line and address associated potential land use plan amendments. EIS-0474-NOI-2012.pdf More Documents & Publications 2013 Annual Planning Summary for the Western Area Power Administration Environmental Impact Statements and Environmental Assessments Status Chart

277

Microsoft Word - LaneElectricCooperativeIncBAASA-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

August 3, 2011 August 3, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum J. Diego Ochoa Transmission Account Executive - TSE-TPP-2 Proposed Action: Bonneville Power Administration (BPA) proposes to enter into a 30 year Balancing Authority Area Service Agreement (BAASA) with Lane Electric Cooperative, Inc. (LEC). LEC's King Estate Solar Generator Project (Project) interconnects directly with LEC's 34.5-kilovolt (kV) transmission system, which interconnects with BPA's 34.5-kV Eugene Substation. The Parties propose to enter into an operations and maintenance agreement to enable the Project to operate within BPA's balancing authority area. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Establishment

278

CX-007736: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

36: Categorical Exclusion Determination 36: Categorical Exclusion Determination CX-007736: Categorical Exclusion Determination Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy Funding will support development of the Voltage-Gated Bipolar Transistor (VGBT), a novel silicon carbide (SiC) bipolar power switch that could drastically improve the efficiency, performance, and reliability of power converters used in high voltage, high energy systems, including utility scale inverter applications, solar/wind farm to grid power converters, solid-state power substations, and high voltage direct current transmission

279

EA-1617: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

280

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Goodnoe Hills and White Creek Wind Energy Goodnoe Hills and White Creek Wind Energy Projects The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 350 megawatts (MW) of power to be generated by the proposed Goodnoe Hills (150 MW) and White Creek (200 MW) Wind Energy Projects (Wind Projects) into the Federal Columbia River Transmission System (FCRTS). The Wind Projects will be interconnected at the proposed BPA Rock Creek substation. This substation will be constructed as a 500/230-kilovolt (kV) substation along BPA's Wautoma - John Day No.1 500-kV transmission line. These proposed facilities will be located in Klickitat County, Washington. DOE/EIS-0183, Record of Decision for the Electrical Interconnection of the Goodnoe Hills and White Creek Wind Energy Projects (October 2005)

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

CX-007141: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

07141: Categorical Exclusion Determination 07141: Categorical Exclusion Determination CX-007141: Categorical Exclusion Determination Electrical District 4 - Electrical District 5 - Structure Replacement CX(s) Applied: B4.6 Date: 09/01/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace 9.2 miles of 115-kilovolt (kV) wood H-frame structures with 230-kV double-circuit steel monopoles and the existing conductor with a single circuit of 1272 kcmil ACSS. The second circuit will not be installed as a part of this project. The rebuild will include new hardware and insulators as well as one optical ground wire (OPGW) for the entire length of the line. Western will use existing access roads to bring personnel and equipment to the work area. The new lines will be designed to

282

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Broader source: Energy.gov (indexed) [DOE]

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

283

EIS-0389: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0389: Final Environmental Impact Statement Trinity Public Utilities District Direct Interconnection Project The Western Area Power Administration (Western), part of the U.S. Department of Energy (DOE), prepared an environmental impact statement (EIS) on the construction and operation of proposed power transmission facilities in Trinity County, California. The U.S. Forest Service (USFS), the Bureau of Land Management (BLM), and the Bureau of Reclamation (Reclamation) participated in the preparation of the EIS, which addresses the proposed removal of about 5.3 mi of 12-kilovolt (kV) distribution line and the construction and operation of about 16 mi of new 60-kV transmission line, a tap structure and associated equipment, and a new switchyard. The

284

Microsoft Word - CX_Memo_FranklinSubstation.docx  

Broader source: Energy.gov (indexed) [DOE]

Amy Freel Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Franklin Substation Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electrical power substations and interconnection facilities Location: Pasco, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA proposes to make improvements to the BPA fee-owned Franklin Substation located in southeastern Washington in order to bring the substation into compliance with BPA's minimum voltage guidelines. A shunt capacitor bank would be installed to provide voltage support. Project activities would include moving a temporary mobile capacitor bank, removing transformers, extending a 115-kilovolt (kV) bus, installing a new 115-kV

285

CX-007143: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

43: Categorical Exclusion Determination 43: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

286

Microsoft Word - CX-Libby-Troy-AR-Revised-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Dave Forward Road Designer - TELF-TPP-3 Proposed Action: Libby-Troy Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Lincoln County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade and improve access roads from Structures 23/3 through 24/6 on the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kilovolt (kV) transmission line. Background This project entails improving the several existing access roads along the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kV transmission line. Action locations for project access and road repair activities will include:

287

Microsoft Word - CX_Memo_Lex-Del  

Broader source: Energy.gov (indexed) [DOE]

0 2013 0 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kV transmission line to Cowlitz County Public Utility District No.1 (Cowlitz PUD) in Cowlitz County, WA. BPA would sell the first four spans of the line, from BPA's Lexington Substation to approximately 2,000 feet northwest to structure 30/8,

288

EA-1503: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1503: Final Environmental Assessment EA-1503: Final Environmental Assessment EA-1503: Final Environmental Assessment Vermont Electric Power Company Proposed Northern Loop Project The Northern Loop Project proposed by VELCO involves upgrades in Vermont at three existing substation1 locations (St. Johnsbury, Irasburg and Highgate), additional line equipment at two tap2 points (Mosher's Tap in Newport and the St. Albans Tap) and an upgrade of an existing 6.47-mile, 48-kilovolt (kV) transmission line, located between VELCO's Irasburg Substation iiand Mosher's Tap, to accommodate a new 115-kV transmission circuit. Environmental Assessment, Vermont Electric Power Company Proposed Northern Loop Project, DOE/EA-1503, 2004 More Documents & Publications EA-1503: Finding of No Significant Impact CX-000605: Categorical Exclusion Determination

289

Microsoft Word - PGE LURR - CX.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Monica Stafflund Realty Specialist - TERR-Chemawa Proposed Action: Portland General Electric (PGE) 13-kilovolt (kV) Overhead Electrical Line Land Use Review Request (LURR) Budget Information: 00184006, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way. Location: Township 7 south, Range 3 West, Section 17, Polk County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow PGE a 1-mile long, 20-foot wide easement on BPA fee-owned property for the purpose of constructing a new 13-kV power line parallel to BPA's existing Chemawa-Salem transmission line in Polk County, Oregon. Construction disturbance

290

Microsoft Word - CX_FINAL_Sale_of_Eight_Spans_Tanner_Tap_115-kV_Transmission_Line_to_PSE_6-5-2012_.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan B. Kendall Project Manager -TERR-3 Proposed Action: Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24. Property Transfer Location: King County, Washington; Township 24 North, Range 7 East, Section 36, Willamette Meridian Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell to Puget Sound Energy (PSE) the first eight spans of its 115-kV Tanner Tap to Snoqualmie-Lake Tradition #1 transmission line (Tanner Tap-8). Tanner Tap-8, built in 2002, is owned and operated by BPA and located within a 150 feet

291

EIS-0457: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Record of Decision Record of Decision EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR BPA decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. EIS-0457-ROD-MAP-2012.pdf More Documents & Publications EIS-0457: Mitigation Action Plan EIS-0457: Final Environmental Impact Statement

292

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Broader source: Energy.gov (indexed) [DOE]

7, 2009 7, 2009 CX-001263: Categorical Exclusion Determination Hire a Consultant CX(s) Applied: A9, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Livingston, Louisiana Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001255: Categorical Exclusion Determination Energy Efficiency (EE) and Conservation, Loan Program, EE Upgrades, and Update Traffic Lights CX(s) Applied: A1, A8, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Bridgeport, Connecticut Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001253: Categorical Exclusion Determination Build and Operate 33-kilovolt (kV)/12kV Substation at the Southern California Logistics Airport CX(s) Applied: B4.11, B5.1 Date: 12/17/2009 Location(s): Victorville, California Office(s): Energy Efficiency and Renewable Energy

293

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Broader source: Energy.gov (indexed) [DOE]

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

294

CX-003789: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

789: Categorical Exclusion Determination 789: Categorical Exclusion Determination CX-003789: Categorical Exclusion Determination Grandview-Red Mountain Number 1 Proposed Transmission Line Interconnection CX(s) Applied: B4.6 Date: 09/08/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to construct a 115-kilovolt (kV) tap point consisting of two 115-kV sectionalizing switches with loop breaking capability on the Grandview-Red Mountain Number 1 transmission line between structures 18/1 and 18/2 in order to accommodate an interconnection request by Benton Rural Electric Association (REA) for their Acord Substation development project. BPA would be responsible for revenue metering at the new Acord Substation, and for the tap, which would

295

CX-004263: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-004263: Categorical Exclusion Determination L0295 - Saint Johns-Saint Helens Number 1 Interconnection Project CX(s) Applied: B4.6 Date: 10/15/2010 Location(s): Columbia County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new tap and associated disconnect structures on BPA?s Saint Johns-Saint Helens Number 1 115-kilovolt (kV) transmission line to provide a point of interconnection for Columbia River Public Utility District's (CRPUD's) new Columbia River Substation. CRPUD is constructing the new 115-kV substation in Columbia County, Oregon to serve residential load growth in the area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004263.pdf More Documents & Publications

296

CX-007131: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

297

EA-1542: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

42: Finding of No Significant Impact 42: Finding of No Significant Impact EA-1542: Finding of No Significant Impact Burleigh County Wind Energy Center, North Dakota Basin Electric Power Cooperative (Basin), on behalf of FPL Energy Burleigh County Wind, LLC (Burleigh County Wind), applied to the Department of Energy (DOE), Western Area Power Administration (Western) to interconnect the Burleigh County Wind Energy Center in Burleigh County, North Dakota, to Western's Garrison-Bismarck 230-kilovolt (kV) Transmission Line. Burleigh County Wind proposes to build a wind energy center consisting of wind turbines, collection subtransmission lines, and a collection substation. Western would construct facilities to support the interconnection at the Garrison-Bismarck 230-kV Transmission Line. Central Power Electric

298

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind Project to BPA's 500-kV transmission system.

299

EA-1595: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

95: Finding of No Significant Impact 95: Finding of No Significant Impact EA-1595: Finding of No Significant Impact Davis-Mead 230-kV Transmission Line Reconductor Project, Mohave County, Arizona and Clark County, Nevada Western Area Power Administration proposes to reconductor the existing 61-mile long 230-kilovolt Davis-Mead Transmission Line located in Clark County, Nevada and Mohave COunty, Arizona. Western owns and operates the existing transmission line. THe transmission line is a mjor component of the electric transmisison grad of the western United States. Department of Energy, Western Area Power Administration Finding of No Significant Impact and Floodplain Statements of Findinds Davis-Mead 230-kV Transmission Line Reconductor Project More Documents & Publications EA-1595: Final Environmental Assessment

300

Microsoft Word - CX-SundialIsland-FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP- TPP- 1 Proposed Action: Sundial Island Transmission Tower Relocation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Multnomah County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to relocate two transmission towers located on Sundial Island in the Sandy River Delta Recreation Area (SRD). The transmission towers, Big Eddy-Troutdale No. 1 230-kilovolt (kV) tower 77/1 and Ostrander-Troutdale No. 1 500-kV tower 24/1, are being compromised by stream bank erosion. Sundial Island is located within the Columbia River Gorge National Scenic Area (NSA) and is a

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

CX-007161: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61: Categorical Exclusion Determination 61: Categorical Exclusion Determination CX-007161: Categorical Exclusion Determination Pinnacle Peak Substation Conductor & Circuit Breaker Replacement CX(s) Applied: B4.6 Date: 12/03/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on replacing 230-kilovolt (kV) conductor in four bays and one 230-kV power circuit breaker voltage transformer within the fenced area of the Pinnacle Peak Substation, This will also consist of rerouting existing conduit in a 20 foot trench going 24 inches in depth. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the

302

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Willow Creek - Willow Creek - Granby Tap 2.4-kV Distribution Line Structure 0/3A Pole Replacement Project Grand County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to replace Structure No. O/3A on its Willow Creek - Granby Tap 2.4 kilovolt (kV) distribution line in Grand County, Colorado. This undertaking will involve the replacement of poles of the existing wooden H-frame structure, and construction of two level landings. An existing access road will be used to allow safe passage of rubber-tired auger truck and bucket truck to Structure O/3A. The pole replacement process would involve moderate to severe ground disturbance; the rejected pole is lifted out of the ground using a hydraulic jack and a rubber-tired truck-mounted auger is

303

CX-000605: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

605: Categorical Exclusion Determination 605: Categorical Exclusion Determination CX-000605: Categorical Exclusion Determination Naselle Tap Modification Loop into Driscoll Substation CX(s) Applied: B4.6, B4.11 Date: 01/27/2010 Location(s): Clatsop County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to expand the existing Driscoll Substation to accommodate a 115-kilovolt (kV) ring bus and rebuild 2.5 miles of the Allston-Astoria Number 1 (No.1) line to double circuit to facilitate looping the Allston-Astoria No.1 and Naselle Tap lines into the Driscoll Substation in Clatsop County, Oregon. Currently the Allston-Astoria No.1 and Naselle Tap 115-kV lines form a three-terminal line with eight taps. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000605.pdf More Documents & Publications

304

Microsoft Word - Celilo_CX_Memo_04-12-2013.docx  

Broader source: Energy.gov (indexed) [DOE]

Emmanuel Jaramillo Emmanuel Jaramillo Project Manager, TEP-TPP-1 Proposed Action: Celilo Fiber System Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber Optic Cable Location: East of The Dalles, Wasco County, Oregon in T 1 N, R 14 E, Sec 6 and T 2 North, R 14 East, Sec 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install fiber optic cable, and associated vault between three substations (Big Eddy 230-kilovolt (kV) Substation, Big Eddy 500-kV Substation, and Celilo Substation) that are located in the same general vicinity on BPA owned property. See attached map. The fiber optic cable would be about 13,000 feet long. The fiber optic cable would be strung on approximately 25 new 40-foot tall wood poles that would be

305

Microsoft Word - Midway-Benton_FONSI_Final.docx  

Broader source: Energy.gov (indexed) [DOE]

Midway-Benton No. 1 Transmission Line Rebuild Project Midway-Benton No. 1 Transmission Line Rebuild Project U.S. Department of Energy Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-1912 Summary Bonneville Power Administration (BPA), in coordination with the U.S. Department of Energy- Richland (DOE-RL), announces its environmental findings on the Midway-Benton No. 1 Transmission Line Rebuild Project (Proposed Action). The Proposed Action would replace the approximately 28.2-mile-long, 115-kilovolt (kV) Midway-Benton No. 1 transmission line and approximately 11 miles of the 115-kV Benton-Othello No. 1 transmission line between the existing Midway and Benton Substations. All of the Proposed Action would be located on the Hanford Site in Benton County, Washington.

306

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

307

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Broader source: Energy.gov (indexed) [DOE]

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

308

Record of Decision and Floodplain Statement for the Interconnection of the Southpoint Power Plant with the Wester Area Power Administration's Parker-Davis No. 1 and No. 1 kilovolt Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

44 44 Federal Register / Vol. 64, No. 62 / Thursday, April 1, 1999 / Notices obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified or filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. Linwood A. Watson, Jr., Acting Secretary, [FR Doc. 99-7991 Filed 3-31-99; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Surrender of Exemption and Soliciting Comments, Motions To Intervene, and Protests March 26, 1999. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Surrender of Exemption.

309

Data:5078884a-59d5-4b2b-ade6-fb1b21abaa87 | Open Energy Information  

Open Energy Info (EERE)

Rate name: Large Power 50 - 350 kVA Sector: Commercial Description: The installed transformer capacity exceeds 50 kVA, but is less than 350kVA. Source or reference: Illinois...

310

Data:6ddea1d8-5d03-4a86-ac9d-3e8729ed8103 | Open Energy Information  

Open Energy Info (EERE)

ddea1d8-5d03-4a86-ac9d-3e8729ed8103 ddea1d8-5d03-4a86-ac9d-3e8729ed8103 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2011/07/01 End date if known: Rate name: SCHEDULE CQ GENERAL SERVICE - 2kV to 15kV Sector: Industrial Description: AVAILABILITY Available only at accounts served as of October 1, 1993 for single phase and three phase Service at standard Cooperative voltage. The standard voltage available depends upon the location, character and size of the consumer's load. This information can be furnished at any of the Cooperative's offices. Service shall not be available for Standby or Maintenance Service such as that required for alternative generation facilities. Available to all Member/Consumers of this class within the new service territory acquired from Potomac Edison Company. Voltage Discount (kw) (a)2kv to 15 kv @$0.25 per kw RKVA Charge: (a)Reactive kilovolt-ampere charge is applied to the Consumer's rkva capacity requirement in excess of 25% of the Consumer's kilowatt capacity. Billing rkva @$0.40 per rkva

311

CX-007989: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

proposes to interconnect Grant's new 230-kilovolt transmission line into bay 7 within the BPA owned 230-kilovolt Columbia Substation. Microsoft Word - GrantPUD-CX.docx More...

312

London and Home Counties Joint Electricity Authority  

Science Journals Connector (OSTI)

... The bulk supply from the Grid is taken at 33 kilovolts, transformed at the Grid substations to 11 kilovolts and then transmitted to the Authority. ...

1935-11-09T23:59:59.000Z

313

Data:C95afdc7-ec3a-4c43-9e4e-8b4102d96240 | Open Energy Information  

Open Energy Info (EERE)

20131010 End date if known: Rate name: Single Phase Less Than 50 KVA of Installed Transformer Capacity Sector: Commercial Description: Customers with less than 50 KVA of...

314

Data:4d3cdf25-8153-4023-911b-eb75d983a48a | Open Energy Information  

Open Energy Info (EERE)

20131010 End date if known: Rate name: Three Phase Less Than 50 KVA of Installed Transformer Capacity Sector: Commercial Description: Customers with less than 50 KVA of...

315

Data:04b88a25-ddab-4dbe-9e00-198184c89c87 | Open Energy Information  

Open Energy Info (EERE)

Electric Service Sector: Description: Available to consumers requiring a transformer capacity greater than 15 kVA through 500 kVA, subject to the established rules and...

316

Data:67df4487-14d2-4964-86dc-5a50bfa46553 | Open Energy Information  

Open Energy Info (EERE)

date: 20131010 End date if known: Rate name: Greater than 50 KVA of Installed Transformer Capacity Sector: Industrial Description: Customers with less than 50 KVA of...

317

Data:D02b96e9-a646-4085-9863-e10caf87611b | Open Energy Information  

Open Energy Info (EERE)

- Multiphase Sector: Commercial Description: Available to consumers requiring a transformer capacity greater than 50 kVA through 500 kVA, subject to established rules and...

318

Data:161814b1-a2d2-400d-b32d-d80eb2ea95cd | Open Energy Information  

Open Energy Info (EERE)

Rate name: Large Power Over 350 kVA Sector: Commercial Description: The installed transformer capacity exceeds 350 kVA. Source or reference: Illinois State University Archive...

319

Microsoft Word - DOE-ID-INL-14-043.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Lab) researchers require the following actions: 1. Relocate existing 75 KVA transformer on top of new 150 KVA transformer Unistrut frame. 2. Provide and install a new 150...

320

Data:46162d74-c1d2-4c45-9628-837a8408afd1 | Open Energy Information  

Open Energy Info (EERE)

d74-c1d2-4c45-9628-837a8408afd1 d74-c1d2-4c45-9628-837a8408afd1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2001/11/01 End date if known: Rate name: LARGE POWER SERVICE - Schedule LP-3 - Secondary Sector: Industrial Description: This schedule applies to all large power customers where actual demand has exceeded one thousand kilowatts three times or more within the preceding twelve months or where installed capacity serving a customer at a single, contiguous site is 2500 kilovolt-amperes (KVA) or greater. Heavy Load Period Demand Charges: The maximum billing occurring during the hours of 7 a.m. through 12 noon, Monday through Saturday, after adjustment for power factor.

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:Fdae0f06-57d3-4f1a-aa6e-18f04ffbe08a | Open Energy Information  

Open Energy Info (EERE)

Fdae0f06-57d3-4f1a-aa6e-18f04ffbe08a Fdae0f06-57d3-4f1a-aa6e-18f04ffbe08a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2001/11/01 End date if known: Rate name: LARGE POWER SERVICE - Schedule LP-3 - Primary Sector: Industrial Description: This schedule applies to all large power customers where actual demand has exceeded one thousand kilowatts three times or more within the preceding twelve months or where installed capacity serving a customer at a single, contiguous site is 2500 kilovolt-amperes (KVA) or greater. Heavy Load Period Demand Charges The maximum billing occurring during the hours of 7 a.m. through 12 noon, Monday through Saturday, after adjustment for power factor.

322

Data:50e54203-3562-49df-9954-b9078d1e97d9 | Open Energy Information  

Open Energy Info (EERE)

03-3562-49df-9954-b9078d1e97d9 03-3562-49df-9954-b9078d1e97d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2011/07/01 End date if known: Rate name: SCHEDULE GQ GENERAL SERVICE - 2kV to 15kV voltage Sector: Industrial Description: AVAILABILITY Available for single phase and three phase Service at standard Cooperative voltage. The standard voltage available depends upon the location, character and size of the consumer's load. This information can be furnished at any of the Cooperative's offices. Service shall not be available for Standby or Maintenance Service such as that required for alternative generation facilities. Available to all Member/Consumers of this class within the new service territory acquired from Potomac Edison Company. Demand Charge(distribution): Minimum kw @$0.99 per kw All kw in excess of 7.5 measured as set forth under "Determination of Capacity" @$0.77 per kw Demand Charge(Supply) Minimum kw @$1.85 per kw All kw in excess of 7.5 measured as set forth under "Determination of Capacity" @$1.44 per kw Voltage Discount (kw) (a)2kv to 15 kv @$0.25 per kw (b)Over 15 kv @$0.50 per kw RKVA Charge: (a)Reactive kilovolt-ampere charge is applied to the Consumer's rkva capacity requirement in excess of 25% of the Consumer's kilowatt capacity. Billing rkva @$0.40 per rkva

323

CX-008789: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-008789: Categorical Exclusion Determination Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles).

324

Data:F7b8506d-5d3e-4ce0-abc9-a4a383eda56e | Open Energy Information  

Open Energy Info (EERE)

06d-5d3e-4ce0-abc9-a4a383eda56e 06d-5d3e-4ce0-abc9-a4a383eda56e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wheat Belt Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: LARGE POWER Sector: Industrial Description: Qualifying Service Any single-phase or multi-phase service, greater than 50 kVA and less than 1000 kVA connected transformer capacity, delivered from the 12.5/7.2 or 24.9/14.4 kV distribution system. Power Factor Charge A power factor charge will be assessed to compensate for average power factor lower than eightyfive (85%) lagging. The power factor charge will be calculated by increasing the demand charge by one percent (1%) for each one percent (1%) by which the average power factor is less than eightyfive (85%) lagging. The District will consult with the customer regarding power factor correction and applicable charges before applying the provisions of this clause.

325

Microsoft Word - BingenSwitchDisposition_CXMemo.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2012 7, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Bingen Substation Sectionalizing Switches Disposition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Klickitat County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell two sectionalizing switches owned by BPA but located on PacifiCorp's Condit-Powerdale 69-kilovolt (kV) line in and adjacent to the Bingen Substation. BPA sold the Bingen substation to Klickitat County PUD in 1997 but retained ownership rights to inspect, maintain, repair, and replace its remaining revenue meters,

326

EA-1731: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115-kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is located in Walla Walla and Columbia counties in Washington, extending from the city of Walla Walla to near the town of Dayton. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Final Environmental Assessment

327

EIS-0443: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Record of Decision 3: Record of Decision EIS-0443: Record of Decision Project Financing for Southwest Intertie Project - South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

328

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

14: Draft Environmental Impact Statement 14: Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

329

EIS-0317: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

7: EPA Notice of Availability of the Draft Environmental 7: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement Kangley-Echo Lake Transmission Line Project Notice of availability of the Kangley-Echo Lake Transmission Line Project construction of a new 500 kilovolt (kV) transmission line draft environmental impact statement supplement with updated information on the reevaluating alternative not analyzed, COE Section 10 and Permits, King County, WA. Environmental Protection Agency Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement, DOE/EIS-0317 (January 2003) (68 FR 1458) More Documents & Publications EIS-0386: EPA Notice of Availability of the Programmatic Final

330

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343) (08/20/04)  

Broader source: Energy.gov (indexed) [DOE]

COB Energy Facility COB Energy Facility DECISION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the COB Energy Facility with the Federal Columbia River Transmission System (FCRTS), as proposed in the COB Energy Facility Final Environmental Impact Statement (FEIS) (DOE/EIS-0343, June 2004). Proposed by Peoples Energy Resources Company (PERC), the COB Energy Facility involves constructing and operating a new 1,160- megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 50.6-acre site near Bonanza in Klamath County, Oregon, and a 7.2-mile-long 500-kilovolt (kV) transmission line south to BPA's Captain Jack Substation. A Generation Interconnection Agreement with PERC would provide for interconnection of the COB Energy Facility with the FCRTS and

331

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

332

CX-007750: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

333

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

334

Microsoft Word - City_of_Sherwood_LURR_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: City of Sherwood Sewer Line Replacement Land Use Review Request Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 Multiple use of powerline rights-of-way Location: Sherwood, Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request (LURR) submitted by the city of Sherwood (city) to replace a portion of its proposed sewer line within existing BPA fee-owned right-of-way (ROW) between structure 19/11 of BPA's Keeler-Oregon City No. 2 115-kilovolt (kV) transmission line and SW Tualatin-Sherwood Road. The city would replace

335

N:\WPWIN60\ORDERS\PP-118.ORD  

Broader source: Energy.gov (indexed) [DOE]

HILL COUNTY ELECTRIC COOPERATIVE, INC. HILL COUNTY ELECTRIC COOPERATIVE, INC. ORDER NO. PP-118 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order 10485, as amended by Executive Order 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated July 11, 1996, as amended on July 25, 1996, Hill County Electric Cooperative, Inc. (Hill County) applied to FE for a Presidential permit to construct a new 69- kilovolt (kV) electric transmission facility between the United States and Canada from a point in

336

EA-1644: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment Kildeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper Missouri Generation and Transmission Electric Cooperative, Inc. (UMGT), has applied to the U.S. Department of Energy (DOE) Western Area Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission line which would extend about 13 miles northward from Western's Killdeer Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. The Pre-Decisional Environmental Assessment was issued, without changes, as the Final Environmental Assessment.

337

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0183: Record of Decision EIS-0183: Record of Decision EIS-0183: Record of Decision Electrical Interconnection of the Shepherds Flat Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard

338

Categorical Exclusion Determinations: Colorado | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 8, 2013 May 8, 2013 CX-010266: Categorical Exclusion Determination South Table Mountain Energy Systems Integration Facility Hydrogen Fueling Station CX(s) Applied: B1.15 Date: 05/08/2013 Location(s): Colorado Offices(s): Golden Field Office April 26, 2013 CX-010258: Categorical Exclusion Determination Bangladesh Meteorological Instrumentation Installation CX(s) Applied: A9 Date: 04/26/2013 Location(s): Colorado Offices(s): Golden Field Office April 26, 2013 CX-010111: Categorical Exclusion Determination Animas River Substation Site Drainage Remediation CX(s) Applied: B4.6 Date: 04/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region April 26, 2013 CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and

339

Microsoft Word - L0295-StJohnsTap-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joyce Vaughn Project Engineering - TELP-TPP-3 Proposed Action: L0295 - St. Johns-St. Helens #1 Interconnection Project Budget Information: Work Order #004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Columbia County, Oregon (T4N, R1W, Section 7) Proposed by: Bonneville Power Administration (BPA) and Columbia River PUD (CRPUD) Description of the Proposed Action: BPA proposes to install a new tap and associated disconnect structures on BPA's St. Johns-St. Helens #1 115-kilovolt (kV) transmission line to

340

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

25, 2010 25, 2010 CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

6: Notice of Intent to Prepare an Environmental Impact 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement South Oregon Coast Reinforcement Project, Coos Bay, North Bend, Oregon Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area. This plant would require a peak load of 150 megawatts (MW) and an instantaneous peak of 225 MW. The existing transmission system to the area does not have the capacity to serve this potential load and other anticipated load growth on the south coast of Oregon. This project will

342

EIS-0374: EPA Notice of Availability of the Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

74: EPA Notice of Availability of the Final Environmental 74: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon Final EIS, BPA, OR, Klondike III Wind Project (300 megawatts {MW}) and Biglow Canyon Wind Farm (400 megawatts {MW}) Integration Project, Construction and Operation of a Double-Circuit 230- Kilovolt (kV) Transmission, Sherman County, OR. DOE/EIS-0374, Environmental Protection Agency, Notice of Availability of the Final Environmental Impact Statement for Department of Energy, Bonneville Power Administration, Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon, 71 FR 55463 (September 2006) More Documents & Publications

343

Categorical Exclusion Determinations: Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 21, 2012 May 21, 2012 CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests CX(s) Applied: B3.10, B3.11 Date: 05/18/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 17, 2012 CX-008717: Categorical Exclusion Determination Relocation of Wood Poles on Centralia B Street No. 1 for Proposed Centralia City Light May Street Substation CX(s) Applied: B4.6 Date: 05/17/2012

344

Microsoft Word - Creston-Bell MAP_final.docx  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Mitigation Action Plan DOE/EA-4406 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 53.8-mile-long 115-kilovolt (kV) transmission line from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of Spokane, Washington. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental

345

Microsoft Word - CX_Memo_Fairmount.docx  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Fairmount Substation Equipment Acquisition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers. Location: Jefferson County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to a request by Jefferson County Public Utility District No.1 (Jefferson PUD), BPA is proposing to take ownership of equipment owned by Jefferson PUD within BPA's existing Fairmount Substation in Jefferson County, WA. Jefferson PUD, a Network Integration Customer of BPA, would sell its 115-kilovolt (kV) line terminal in Bay

346

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Powet· Administration Powet· Administration Danger Tree Management on Green Mountain to Kremmling 69-kV Transmission Line Summit and Grand Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to survey and inspect all areas along the Green Mountain to Kremmling 69-kilovolt (k V) transmission line to conduct routine vegetation management inspection and danger tree removal. Trained crews will measure electrical clearance distances between the conductor a:nd tree branches and cut down any trees that meet or exceed the allowable clearance distance. Any "danger" trees and vegetation that constitute an electrical hazard to the lines will be removed. Individual trees will be cut, lopped, and scattered within the existing right-of-way (ROW). Also proposed is routine maintenance to clear

347

Microsoft Word - Horse_Butte_G0374_Env_ Clearance_Doc.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Cattle Creek Substation (formerly known as Horse Butte Substation) Budget Information: Work Order # 00283812 (TC AUO) and 00283765 (TC) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 "Construction or electric power substations (including switching stations and support facilities) with power delivery at 230-kilovolt (kV) or below, or modification (other than voltage increases) of existing substations and support facilities, ..." Location: Bonneville County, ID near Idaho Falls. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Utah Associated Municipal Power

348

Microsoft Word - CX_Memo_TVWD.docx  

Broader source: Energy.gov (indexed) [DOE]

31, 2012 31, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kilovolt (kV) transmission line corridor in the City of Beaverton,

349

EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

6: Notice of Intent to Prepare an Environmental Impact 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement South Oregon Coast Reinforcement Project, Coos Bay, North Bend, Oregon Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area. This plant would require a peak load of 150 megawatts (MW) and an instantaneous peak of 225 MW. The existing transmission system to the area does not have the capacity to serve this potential load and other anticipated load growth on the south coast of Oregon. This project will

350

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

891 - 19900 of 28,905 results. 891 - 19900 of 28,905 results. Download CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008890-categorical-exclusion-determination Download CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008891-categorical-exclusion-determination Download CX-009199: Categorical Exclusion Determination Access Road Improvement For the Kalispell-Kerr Number 1, 115-kilovolt (kV)

351

CX-005380: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-005380: Categorical Exclusion Determination Pearl Substation Fiber Project CX(s) Applied: B1.7, B4.7 Date: 02/25/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to allow Portland General Electric (PGE) to install fiber optic cable that connects PGE?s distribution network to the BPA-owned Pearl Substation located within Clackamas County, Oregon. This project would allow the use of line differential relaying on PGE?s McLoughlin-Sherwood-Pearl 230-kilovolt (kV) line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005380.pdf More Documents & Publications CX-006313: Categorical Exclusion Determination CX-006262: Categorical Exclusion Determination

352

EIS-0231: Navajo Transmission Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

353

Microsoft Word - CX-Sacajawea-SunHarborCascadeSteelTapPropertyTransferFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

20, 2012 20, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Acquisition and Disposition of Property Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.24, Property transfers. Location: Walla Walla County, WA; Yamhill County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to dispose of one property and acquire another property in its service territory: Sacajawea-Sun Harbor: BPA proposes to dispose of 2.02 miles of its Sacajawea-Sun Harbor 115-kilovolt (kV) transmission line, associated easement rights, and its Sun Harbor Substation to the Columbia Rural Electric Association (CREA). The transmission line and substation are

354

EA-1467: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact Bonneville-Alcoa Access Road Project Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. Bonneville-Alcoa Access Road Project More Documents & Publications EA-1366: Preliminary Environmental Assessment EA-1366: Finding of No Significant Impact

355

CX-006290: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-006290: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/25/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace all of the aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115 kilovolt (kV) transmission line. Due to the age of the wood poles, the work is necessary to improve the safety, operation, and reliability of the transmission line. All wooden pole structures, hardware, and support structures will be replaced in the original location. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006290.pdf More Documents & Publications

356

CX-005010: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-005010: Categorical Exclusion Determination Ostrander Substation Addition CX(s) Applied: B4.11 Date: 01/06/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to expand its existing Ostrander Substation near Barton, Oregon by approximately 4 acres. The expansion would accommodate three new 230/500 kilovolt (kV) transformers, with provisions for a spare transformer. The expansion of the substation is needed to replace aging infrastructure at the nearby McLaughlin Substation. BPA is proposing to replace the transformers at the Ostrander substation and lease the McLaughlin Substation. The proximity of the west side of the Ostrander Substation would allow connection of the new transformers and

357

CX-006817: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

17: Categorical Exclusion Determination 17: Categorical Exclusion Determination CX-006817: Categorical Exclusion Determination McNary-Ross No. 1 Upgrade Project, Surface Impairment Removal CX(s) Applied: B1.3 Date: 09/20/2011 Location(s): Klickitat and Clark Counties, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to address five surface impairments that were identified on the 345-kilovolt (kV) McNary-Ross No. 1 transmission line. At these locations, the distance from the conductor to the ground surface does not have adequate clearance for operation at 70?C. BPA proposes to re-shape the existing ground surface in these areas to achieve adequate clearance. The proposed work would allow BPA?s McNary-Ross No. 1 transmission line to meet current National Electrical Safety Code

358

CX-005848: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

848: Categorical Exclusion Determination 848: Categorical Exclusion Determination CX-005848: Categorical Exclusion Determination Midway Area Fiber Project CX(s) Applied: B4.7 Date: 05/02/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install about 1.5 miles of aerial fiber optic cable on the existing Midway-Rocky Ford No.1 230-kilovolt (kV) transmission line. The new fiber optic cable would replace the overhead groundwire (OHGW) on the Midway-Rocky Ford No.1 transmission towers. The fiber would span from a tower in the Midway Substation yard to tower 1/1 (first mile/first tower) on the Midway-Rocky Ford line, where a new fiber splice enclosure box would be installed on the tower. The fiber would then continue to replace the existing OHGW and span

359

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Broader source: Energy.gov (indexed) [DOE]

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

360

Record of Decision for the Electrical Interconnection of the Plymouth Generating Facility (DOE/EIS-0345)(10/14/03)  

Broader source: Energy.gov (indexed) [DOE]

for the Electrical Interconnection of the Plymouth Generating Facility October 2003 THE DECISION The Bonneville Power Administration (BPA) has decided to implement the proposed action identified in the Plymouth Generating Facility (PGF) Final Environmental Impact Statement (FEIS) (DOE/EIS-0345, June 2003). The PGF, which has been proposed by Plymouth Energy, LLC (Plymouth Energy), involves construction and operation of a 307-megawatt (MW) natural gas-fired, combined-cycle power generation facility on a 44.5-acre site 2 miles west of Plymouth in Benton County, Washington. Under the proposed action, BPA will offer contract terms for interconnection of the PGF into the Federal Columbia River Transmission System (FCRTS) at BPA's proposed McNary-John Day 500-kilovolt (kV) transmission line at a point approximately

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Microsoft Word - CX-Cardwell-Cowlitz2011WoodPoles_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of all aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115-kilovolt (kV) transmission line Budget Information: Work Order #00279267 PP&A Project No.: 2021 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights of way, infrastructures (e.g.. structures)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is located along Bonneville Power Administration's (BPA)

362

Microsoft Word - CX-LanePhaseSeparationProjects_FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Michael Marleau - TEP-TPP-1 Project Manager Proposed Action: Lane Substation 500/230-kV Transformer Phase Separation Project Project Work Order Number: 00298187 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities Location: Lane Substation, Lane County, Oregon Township 17 South, Range 5 East, Section 36 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to increase the physical distance that separates each phase of the 500/230-kiloVolt transformer banks at BPA's Lane Substation. The reason for the increased distance is to minimize the effects of a transformer fire or explosion as

363

Microsoft Word - CX_Memo_MonroeSubstation.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Monroe Substation Integrated Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electrical power substations and interconnection facilities Location: Snohomish County, Washington; Township 28 North, Range 7 East, Section 22 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The purpose of the project is to provide upgrades required as part of BPA's ongoing sustaining programs by providing voltage support and preventing power outages. The project would consist of the following activities:  Installation of two new 500-kilovolt (kV) shunt capacitor groups with current limiting

364

Microsoft Word - CX-Pearl-Marion-Tower-6-2-Replace_FY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Pearl-Marion No.1 Tower 6/2 replacement project PP&A Project No.: PP&A 2147, WO# 00296634, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Canby, Clackamas County, Oregon Township 3 South, Range 1 East, Section 19 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace a single tower (6/2) on the existing Pearl-Marion No. 1 500-kilovolt (kV) transmission line. Tower 6/2 is located along the Molalla River where natural river channel movement and continued stream bank erosion

365

CX-010549: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-010549: Categorical Exclusion Determination Chappell, Julesburg, and Kersey Tap Line Switch Replacements in Deuel County, Nebraska and Weld County, Colorado CX(s) Applied: B4.6, B4.11 Date: 06/04/2013 Location(s): Nebraska, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (WAPA) proposes to replace the wood-switch structures and 115-kilovolt (kV) line disconnect switches with new switches and steel-box structures at the Chappell and Julesburg Taps in Deuel County, Nebraska and the Kersey Tap in Weld County, Colorado. CX-010549.pdf More Documents & Publications CX-008785: Categorical Exclusion Determination CX-009804: Categorical Exclusion Determination

366

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 16450 of 26,764 results. 41 - 16450 of 26,764 results. Page EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available. http://energy.gov/nepa/ea-1931-keeler-forest-grove-forest-grove-tillamook-line-no-1-line-rebuild-project-washington

367

CX-006304: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

04: Categorical Exclusion Determination 04: Categorical Exclusion Determination CX-006304: Categorical Exclusion Determination Grand Coulee-Bell #3/Grand Coulee-Westside #1 Insulator Replacement and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace worn insulators along the 83-mile Grand Coulee-Bell No. 3 230 kilovolt (kV) double circuit transmission line. Work would be conducted on energized lines using live-line and bare-hand techniques as well as standard techniques requiring an outage. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006304.pdf More Documents & Publications CX-005379: Categorical Exclusion Determination CX-008704: Categorical Exclusion Determination

368

Microsoft Word - Big Eddy ROD.doc  

Broader source: Energy.gov (indexed) [DOE]

Administration's Administration's Big Eddy-Knight Transmission Project Record of Decision September 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. As described in the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421, July 2011), this project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that will be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. For the

369

Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum John Brank Project Manager - TPC-OL Proposed Action: Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-kilovolt (kV) line/convert microwave signals from analog to digital Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: The BPA Chehalis-Covington project would take place at the Chehalis Substation, in Lewis County, WA, at the Covington Substation, in King County, WA and at Tacoma Power's (TPWR) South Tacoma Substation in Pierce County, WA. Proposed by: BPA Description of the Proposed Action: The BPA and TPWR have developed a joint plan to convert the microwave transfer trip signals

370

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

371

EIS-0443: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Final Environmental Impact Statement 3: Final Environmental Impact Statement EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

372

Microsoft Word - CX-Keeler-OregonCity_Access_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Shelley Fenton Shelley Fenton Realty Specialist - TERR-3 Proposed Action: Bonneville Power Administration (BPA) proposes to grant the Murray Hill Recreation Association permission to cross the BPA right-of-way on the Keeler-Oregon City No. 2, 115-kilovolt (kV) corridor between Tower 14/4 and Tower 14/6+250. PP&A Project No.: PP&A 2023 Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Grant or denial of requests for multiple use of a transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and drainage culverts. Location: Section 32; Township 1 South; Range 1 West; Willamette Meridian; Washington County, Oregon Proposed by: BPA

373

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- Final Environmental Impact Statement - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

374

EIS-0421: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

: Record of Decision : Record of Decision EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington For more information contact: Ms. Stacy Mason, Environmental Coordinator Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-5455 Electronic mail: slmason@bpa.gov BPA has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. This project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA?s existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4

375

EA-1731: Mitigation Acton Plan | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Mitigation Acton Plan 1: Mitigation Acton Plan EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla Walla-Tucannon River Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 47-mile-long 115-kilovolt (kV) transmission line from the existing Walla Walla Substation, located in the city of Walla Walla, Washington, to the existing Tucannon River Substation, located near the town of Dayton, Washington. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Finding of No Significant Impact EA-1731: Final Environmental Assessment

376

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

for New Transmission for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

377

Microsoft Word - CaptainJack_Olinda_CX_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cynthia Rounds Project Manager- TPC Proposed Action: Captain Jack-Olinda RAS LLL/LT Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.31 Installation or relocation of machinery and equipment Location: Olinda Substation, Shasta County, CA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund upgrades to BPA equipment at the Transmission Agency of Northern California 500-kilovolt (kV) Olinda Substation (also known as Vic Fazio Substation), which is operated and maintained by Western Area Power Administration (Western). BPA would fund Western to relocate existing and install new

378

Microsoft Word - CX-Hat_Rock_Switch_14June2013  

Broader source: Energy.gov (indexed) [DOE]

7, 2013 7, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Glenn Russell Project Manager -TPCV-TPP-4 Proposed Action: Hat Rock Switching Station Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Umatilla County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund PacifiCorp's rebuild of BPA's Hat Rock Tap Switching Station, which is located within PacifiCorp's McNary-Wallula 230-kilovolt (kV) transmission line right-of-way (ROW). Rebuilding the switching station would include the replacement of sectionalizing switches, the grounding grid, and all signage. The approximately 0.5-acre yard would

379

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

380

CX-002196: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2196: Categorical Exclusion Determination 2196: Categorical Exclusion Determination CX-002196: Categorical Exclusion Determination STS-100 Test Stand Experiment CX(s) Applied: B3.6 Date: 05/04/2010 Location(s): Princeton, New Jersey Office(s): Princeton Site Office, Science The proposed action would consist of operation of a 100 kilovolt (kV) test stand, the STS-I00, acquired from the Lawrence Berkeley National Laboratory (LBNL), in which advanced plasma sources will be developed and ion-ion plasmas will be studied at Princeton Plasma Physics Laboratory. The STS-100 would be used to generate 100 kilo-electron volt ion beams, as well as a general purpose vacuum chamber with excellent diagnostic access. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002196.pdf More Documents & Publications EA-0813: Final Environmental Assessment

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Microsoft Word - FONSI master.doc  

Broader source: Energy.gov (indexed) [DOE]

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1591 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. BPA has prepared an environmental assessment (DOE/EA-1591) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

382

EA-1366: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

66: Finding of No Significant Impact 66: Finding of No Significant Impact EA-1366: Finding of No Significant Impact Santiam-Bethel Tap Transmission Line Project, Oregon Bonneville Power Administration (BPA) proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection (tap) to Portland General Electric's (PGE) Bethel Substation to improve transmission system reliability in the Salem area of northwestern Oregon. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits (double-circuit) in the existing right-of-way. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate overloading of the existing line from Santiam Substation to the

383

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Broader source: Energy.gov (indexed) [DOE]

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

384

Microsoft Word - FONSI final.doc  

Broader source: Energy.gov (indexed) [DOE]

Bonneville-Alcoa Access Road Project Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. BPA has prepared an Environmental Assessment (DOE/EA-1467) to determine if the Proposed Action would cause significant effects that would warrant preparing an Environmental Impact

385

Microsoft Word - Flathead-Sub-L0307-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

13, 2010 13, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Electrical Engineer - TESD-CSB-2 Proposed Action: Flathead Substation Bay Addition - L0307 Budget Information: Work Order # 00004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Flathead County, Montana (T29N, R21W, Section 30) Proposed by: Bonneville Power Administration (BPA) and Flathead Electric Cooperative (FEC) Description of the Proposed Action: FEC has requested a new 230-kilovolt (kV) point of delivery at

386

O:\ELECTRIC\PP-177.ORD  

Broader source: Energy.gov (indexed) [DOE]

BURKE-DIVIDE ELECTRIC COOPERATIVE, INC. BURKE-DIVIDE ELECTRIC COOPERATIVE, INC. ORDER NO. PP-177 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated March 18, 1998, Burke-Divide Electric Cooperative, Inc. (Burke- Divide) applied to FE for a Presidential permit to construct approximately 6,275 feet of 12.47- kilovolt (kV) electric distribution line from a point in North Star Township, Burke County, North

387

Microsoft Word - CX-Midway-Vantage-Fiber.doc  

Broader source: Energy.gov (indexed) [DOE]

2, 2011 2, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Midway Area Fiber Project Budget Information: Work Order 00224734, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. Location: Grant and Benton Counties, Washington Township 13 North, Range 24 East, Sections 2, 11, and 14 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install about 1.5 miles of aerial fiber optic cable on the existing Midway-Rocky Ford No.1 230-kilovolt (kV) transmission line. The new fiber

388

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91 - 23700 of 28,560 results. 91 - 23700 of 28,560 results. Download CX-008402: Categorical Exclusion Determination Granby Pumping Plant Switchyard - Transformer Protective Barrier Walls CX(s) Applied: B4.6 Date: 05/04/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008402-categorical-exclusion-determination Download CX-008406: Categorical Exclusion Determination Structure Replacement Flaming Gorge-Vernal No.3 138 Kilovolt Transmission Line CX(s) Applied: B4.6 Date: 03/06/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008406-categorical-exclusion-determination Download CX-008775: Categorical Exclusion Determination Archer KV1A Replacement Laramie County, Wyoming

389

EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

96: San Luis Transmission Project, Alameda, Merced, San 96: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California Summary DOE's Western Area Power Administration, with the Bureau of Reclamation as a cooperating agency, is preparing a joint EIS and environmental impact report (under the California Environmental Quality Act) to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. Western proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a

390

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

391

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Broader source: Energy.gov (indexed) [DOE]

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

392

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

393

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Loan Guarantee for New Transmission Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

394

Microsoft Word - Ch1_PN_040611km  

Broader source: Energy.gov (indexed) [DOE]

Bandon-Rogue Transmission Line Bandon-Rogue Transmission Line Rebuild Project Finding of No Significant Impact May 2011 This page left intentionally blank. Bonneville Power Administration 1 Bandon-Rogue Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE EA-1739 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Bandon-Rogue Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Bandon-Rogue 115-kilovolt (kV) transmission line. The 46-mile-long transmission line is located in Coos and Curry counties in Oregon, extending from the city of Bandon to near Nesika Beach.

395

CX-009786: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

86: Categorical Exclusion Determination 86: Categorical Exclusion Determination CX-009786: Categorical Exclusion Determination Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25 megavolt Ampere Beck Road Substation, to serve load growth in the region east of Spokane, Washington. CX-009786.pdf More Documents & Publications CX-008691: Categorical Exclusion Determination

396

Microsoft Word - SWPAIceStormDamage_021109.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1/09 1/09 Contacts: Beth Nielsen William Hiller Phone: 918-595-6762 918-595-6697 Email: elizabeth.nielsen@swpa.gov william.hiller@swpa.gov 1 of 1 TULSA, OK - A major segment of 161-kilovolt (kV) transmission line was returned to service around 6:00 p.m. on Tuesday, February 10, 2009, as Southwestern Power Administration (Southwestern), an agency of the U.S. Department of Energy (DOE), continued its efforts to repair damage caused by a January 26-27, 2009 ice storm in Arkansas and Missouri that affected 300 miles of Southwestern's 1,380-mile, high-voltage transmission system. Southwestern Operations reported early February 11, 2009, that repairs to the line stretching from Dardanelle Dam, near Russellville, Arkansas, to the Hilltop Switching Station near Marshall,

397

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

01 - 9110 of 31,917 results. 01 - 9110 of 31,917 results. Download CX-008161: Categorical Exclusion Determination Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008161-categorical-exclusion-determination Download CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008716-categorical-exclusion-determination Download EERE Program Management Guide- Chapter 2

398

CX-007172: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

399

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

400

EA-1644: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain Transmission Project, Richland County, Montana (06/17/09)

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - CX_Memo_Beck.docx  

Broader source: Energy.gov (indexed) [DOE]

January 07, 2013 January 07, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager - TEP-CSB-1 Proposed Action: Beck Road Substation Meter Installation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment. Location: Kootenai County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25

402

EIS-0374: EPA Notice of Availability of the Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Final Environmental EPA Notice of Availability of the Final Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon Final EIS, BPA, OR, Klondike III Wind Project (300 megawatts {MW}) and Biglow Canyon Wind Farm (400 megawatts {MW}) Integration Project, Construction and Operation of a Double-Circuit 230- Kilovolt (kV) Transmission, Sherman County, OR. DOE/EIS-0374, Environmental Protection Agency, Notice of Availability of the Final Environmental Impact Statement for Department of Energy, Bonneville Power Administration, Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon, 71 FR 55463 (September 2006) More Documents & Publications

403

CX-006280: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-006280: Categorical Exclusion Determination Gore Pass Substation Pole Replacement CX(s) Applied: B1.3 Date: 07/01/2011 Location(s): Ground County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration's Craig Field Office plans to replace pole 0/1 in-kind on the Gore Pass-Muddy Pass 69 kilovolt (kV) transmission line. The pole is approximately 60 feet outside the Gore Pass Substation fence and is located between two access roads. The area has considerable ongoing vehicle traffic and human activity. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006280.pdf More Documents & Publications CX-001652: Categorical Exclusion Determination CX-008793: Categorical Exclusion Determination

404

Department of Energy Offers Conditional Commitment for a Loan Guarantee for  

Broader source: Energy.gov (indexed) [DOE]

a Loan a Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Offers Conditional Commitment for a Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest October 19, 2010 - 12:00am Addthis Washington, D.C. -- The U.S. Department of Energy today announced the offer of a conditional commitment for a $350 million loan guarantee to develop the One Nevada Transmission Line (ON Line), the first transmission line project to be offered a conditional commitment by the Loan Programs Office of the Department of Energy. ON Line consists of a new 500 kilovolt (kV) AC transmission line that will run 235 miles from Ely, Nevada to just north of Las Vegas, with a new substation located at the northern end of the line.

405

Microsoft Word - CX_Memo_Kspell  

Broader source: Energy.gov (indexed) [DOE]

01, 2013 01, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Kalispell Substation Shunt Capacitor Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand the substation yard, install new equipment, and construct a new control house within BPA's existing 115-kilovolt (kV) Kalispell Substation in Flathead County, Montana. Existing low voltage conditions at Kalispell Substation could compromise system reliability in the event of a single line loss, which violates BPA steady-

406

CX-005130: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-005130: Categorical Exclusion Determination Ringold Substation Structure Replacement Project CX(s) Applied: B4.6 Date: 01/21/2011 Location(s): Basin City, Washington Office(s): Bonneville Power Administration Bonneville Power Administration is proposing to replace the single pole structure 8/9 of the Benton-Scooteney No. 1 115-kilovolt (kV) transmission line, the attached vertically mounted disconnect switch, and current guy wiring with a new, 30-foot wide, three-pole transposition structure, a new horizontally mounted disconnect switch, and new guy wiring. In addition, a new 14-foot wide two-pole structure and a new 25?5-foot switch support structure would be installed roughly 30-feet ahead of the substation dead-end and approximately 15-feet ahead of the KD, respectively. There

407

EA-1636: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

408

Notices  

Broader source: Energy.gov (indexed) [DOE]

72 Federal Register 72 Federal Register / Vol. 76, No. 112 / Friday, June 10, 2011 / Notices module would contain 2 generating units with a total combined capacity of 2.2 megawatts (MW); (5) a new switchyard containing a transformer; (6) a proposed 300-feet-long, 13-kilovolt (kV) transmission line to an existing distribution line. The proposed project would have an average annual generation of 10.6 megawatt-hours (MWh), which would be sold to a local utility. Applicant Contact: Mr. Wayne Krouse, Hydro Green Energy LLC, 5090 Richmond Avenue #390, Houston, TX 77056; phone (877) 556-6566 x709. FERC Contact: Michael Spencer, (202) 502-6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60

409

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Located in Wyoming and Nebraska A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to replace the wood switch mounting structures and I 15-kilovolt (kV) line discOimect switches with new switches and steel box mounting structures at the Guernsey Rural, Worland, Refinery, Box Butte, and Morrill County Taps located in Platte, Washakie, and Natrona Counties, Wyoming, and Box Butte and Morrill Counties, Nebraska. All line disconnect switches are mounted on four pole wood structures with similar configurations. Many of the switches and wood structures were installed in the early 1950's, are original, obsolete, and difficult to find replacement parts. The mounting wood structures are deteriorating and have

410

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps Located in Wyoming and Nebraska A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to replace the wood switch mounting structures and 115-kilovolt (kV) line discmmect switches with new switches and steel box mounting structures at the Guernsey Rural, Worland, Refinery, Box Butte, and Morrill County Taps located in Platte, Washakie, and Natrona Counties, Wyoming, and Box Butte and Morrill Counties, Nebraska. All line disconnect switches are mounted on four pole wood structures with similar configurations. Many of the switches and wood structures were installed in the early 1950's, are original, obsolete, and difficult to find replacement parts. The mounting wood structures are deteriorating and have

411

Microsoft Word - CX Memo LaPineShunt  

Broader source: Energy.gov (indexed) [DOE]

Michael Gilchrist Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: LaPine Substation Shunt Reactor Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: LaPine, Deschutes County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to add equipment at its LaPine Substation in Deschutes County, Oregon to improve regional transmission voltage stability and increase transmission network efficiency. The site is located on land managed by the U.S. Forest Service. BPA would install a 230-kilovolt (kV) shunt reactor bank, bus bar and associated electrical work in the northeast corner of the substation tract. The substation fenceline and groundmat would be

412

EA-1635: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Finding of No Significant Impact 5: Finding of No Significant Impact EA-1635: Finding of No Significant Impact Williston to Tioga Transmission Line Project, North Dakota Basin Electric Power Cooperative (BEPC) proposes to construct and operate a new 230-kilovolt (kV) transmission line to meet existing and future electric power requirements in northwestern North Dakota, and to interconnect this new transmission line to the Western Area Power Administration's (Western) transmission system. The EA identified no potentially significant impacts to environmental resources resulting from either Western's Federal action or Basin Electric's Proposed Project. Finding of No Significant Impact for Williston to Tioga Transmission Line Project Pre-Approval Review, DOE/EA-1635 (May 2010) More Documents & Publications

413

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

CrystalllS-kV Transmission Line Routine Maintenance of CrystalllS-kV Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-ways (ROW) along the Curecanti-Crystal (CCI-CRY) liS-kilovolt (kV) transmission line to safely access structures 112,1/6,4/1, 6IS-6, 7/1-9, and 8/1-4 (approximately 3 miles). The project is located on private and u.s. Bureau of Land Management (BLM) lands in Montrose County, Colorado. Routine maintenance actions proposed for CCI-CRY IIS-kV transmission line include the following: I) Access road grading and improvements. A rubber-tired motor grader andlor a track dozer would

414

Microsoft Word - CX-Wautoma-OstranderUpgradeFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Nathan Mullen Civil Engineer - TELP-TPP-3 Proposed Action: Wautoma-Ostrander Surface Impairment Removal PP&A Project No.: 2361 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Location: Project activities would take place in Klickitat County, Washington, on the Yakama Reservation, Township 6N, Range 17E, Section 23. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to remove soil between structure 58/3 and 58/4 on the 500-kilovolt (kV) Wautoma-Ostrander No. 1 transmission line. Presently, the distance from the conductor to the ground surface does not have adequate clearance for operation at 100°C.

415

EA-1366: Preliminary Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

66: Preliminary Environmental Assessment 66: Preliminary Environmental Assessment EA-1366: Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate overloading of the existing line from Santiam Substation to the line's connection to Bethel Substation by having one new line supply Bethel Substation and the other new line supply Chemawa Substation.

416

Microsoft Word - CX-NorthBonneville75-4ReplacementWenatcheeFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

KEPR/Pasco KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: North Bonneville-Midway No. 1 Tower 75/4 Replacement PP&A Project No.: 2410 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: The work associated with this project will take place in the areas shown in the table below: Transmission Line/ROW Structure # Township Range Section County, State North Bonneville- Midway #1 75/4 6N 17E 14, 23 Klickitat, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and

417

CX-009705: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

705: Categorical Exclusion Determination 705: Categorical Exclusion Determination CX-009705: Categorical Exclusion Determination Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to increase the physical distance that separates each phase of the 500/230-kiloVolt transformer banks at BPA's Lane Substation. The reason for the increased distance is to minimize the effects of a transformer fire or explosion as outlined in the Institute of Electrical and Electronic Engineers, Inc. guidelines for substation fire suppression. CX-009705.pdf More Documents & Publications CX-008705: Categorical Exclusion Determination CX-009708: Categorical Exclusion Determination

418

DOEEA-(0962) BLM EA # CA-016-93-140 BLM R/W S E W NO. CA 31330  

Broader source: Energy.gov (indexed) [DOE]

(0962) (0962) BLM EA # CA-016-93-140 BLM R/W S E W NO. CA 31330 JOINT ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION AND ROUTINE OPERATION OF A 12-KILOVOLT (KV) OVERHEAD POWERLINE RIGHT-OF-WAY, AND FORMAL AUTHORIZATION FOR A 10-INCH AND 8-INCH FRESH WATER PIPELINE RIGHT-OF-WAY, NAVAL PETROLEUM RESERVE NO. 1, KERN COUNTY, CALFORNIA OCTOBER 1994 U.S. DEPARTMENT OF ENERGY NAVAL PETROLEUM RESERVES IN CALIFORNIA U. S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT CALIENTE RESOURCE AREA . DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for

419

EIS-0421: Big Eddy-Knight Transmission Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21: Big Eddy-Knight Transmission Line 21: Big Eddy-Knight Transmission Line EIS-0421: Big Eddy-Knight Transmission Line Overview BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line would extend generally northeast from BPA's existing Big Eddy Substation in The Dalles, Oregon, to a new substation (Knight Substation) proposed to be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The proposed Big Eddy Knight Transmission Project is needed to increase transmission capacity to respond to requests for transmission service in this area. Public Comment Opportunities No public comment opportunities available at this time.

420

EA-1644: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Broader source: Energy.gov (indexed) [DOE]

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

422

Microsoft Word - NEPA_CX_Acquisition_of_OTEC_Disconnect_Switch_LaGrand_Substation_05-08-2012.docx  

Broader source: Energy.gov (indexed) [DOE]

Kelly Miller Kelly Miller Project Manager - TG-DITT-2 Proposed Action: BPA Acquisition of OTEC Disconnect Switch at the BPA LaGrande Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24 Property Transfer Location: BPA LaGrande Substation, in the City of LaGrande, Union County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to purchase the 230-kilovolt (kV) main bus disconnect switch (MB A-270) that is currently installed and operating within the BPA LaGrande Substation. The disconnect switch is owned by the Oregon Trail Electric Cooperative (OTEC). On October 7, 2011, the manager of engineering for OTEC requested that BPA purchase the disconnect switch. The disconnect switch is the only piece of equipment within

423

EA-1855: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

424

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

425

Microsoft Word - CX-Drummond-MacksInn-WoodPoleReplacementFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

29, 2012 29, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Swan Valley-Teton 115-kilovolt (kV) transmission line rights-of-way. PP&A Project Number: 2486 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 3N 44E 28 Teton Swan Valley - Teton 10/6 Forest Forest Service 14S 5E 19 Fremont

426

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 28660 of 28,904 results. 51 - 28660 of 28,904 results. Download EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve- October 17, 2012 EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve, approved at the October 15-16, 2012 EAC Meeting. http://energy.gov/oe/downloads/eac-recommendations-doe-action-regarding-strategic-portable-generation-reserve-october Download CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008716-categorical-exclusion-determination

427

Microsoft Word - Soos_Creek_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

Timothy Wicks Timothy Wicks Realty Specialist - TERR-COVINGTON Proposed Action: Soos Creek Water & Sewer District Land Use Review Request Case No. 20120040 Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 - Multiple use of powerline rights-of-way Location: Covington, King County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request from Soos Creek Water & Sewer District (District) to construct a new sewer line that would cross under an existing road on BPA fee-owned property near structures 1/2 and 1/3 of the Covington-Maple Valley No. 2 230-kilovolt (kV) transmission line. The proposed sewer line

428

DOE/EIS-0183: Record of Decision for the Electrical Interconnection of the Shepherds Flat Wind Energy Project (07/18/08)  

Broader source: Energy.gov (indexed) [DOE]

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project July 2008 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind

429

EIS-0379: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

79: Record of Decision 79: Record of Decision EIS-0379: Record of Decision This Record of Decision was issued for Environmental Impact Statement (EIS-0379) that assessed the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-ROD-2008 More Documents & Publications EIS-0379 - Final Environmental Impact Statement

430

Microsoft Word - CX-HotSpringsGravityDrainsFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Nicholson Project Manager - TELF-TPP-3 Proposed Action: Install gravity drain system and oil stop valves, reshape west side perimeter ditch and flush out yard drains at the Hot Springs Substation. PP&A Project No.: 2383 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6, Additions and modifications to transmission facilities Location: T21N, R24W, S14, PM, Sanders County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Using directional drilling equipment, approximately 3,644 linear feet of gravity drain line will be installed under the existing electrical manhole system located in the Hot Springs Substation 230 and 500 Kilovolt (kV) yards. Each manhole

431

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

432

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 17760 of 26,764 results. 51 - 17760 of 26,764 results. Page EIS-0486: Plains & Eastern Clean Line Transmission Project This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). http://energy.gov/nepa/eis-0486-plains-eastern-clean-line-transmission-project

433

CX-006302: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

302: Categorical Exclusion Determination 302: Categorical Exclusion Determination CX-006302: Categorical Exclusion Determination Colville-Republic Rebuild Project CX(s) Applied: B1.3, B4.6 Date: 07/21/2011 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures along approximately 13.5 miles of the Colville-Republic No. 1 115 kilovolt (kV) transmission line (structures 1/1-14/5). BPA would replace wood pole structures in kind and at their currently existing locations. In addition to pole replacement, BPA would replace structure crossarms, insulators, dampers and conductor. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006302.pdf More Documents & Publications CX-010439: Categorical Exclusion Determination

434

Categorical Exclusion Determinations: Wyoming | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Wyoming Wyoming Categorical Exclusion Determinations: Wyoming Location Categorical Exclusion Determinations issued for actions in Wyoming. DOCUMENTS AVAILABLE FOR DOWNLOAD July 26, 2013 CX-010688: Categorical Exclusion Determination Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC July 26, 2013 CX-010687: Categorical Exclusion Determination Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC July 2, 2013 CX-010686: Categorical Exclusion Determination Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region June 28, 2013

435

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

436

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

437

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

438

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final  

SciTech Connect (OSTI)

This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

None

1999-02-01T23:59:59.000Z

439

EIS-0325: EPA Notice of Availability of the Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

25: EPA Notice of Availability of the Final Environmental 25: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0325: EPA Notice of Availability of the Final Environmental Impact Statement Schultz-Hanford Transmission Line Project New 500 kilovolt (kV) Transmission Line Construction, Central Washington, north of Hanford connecting to existing line at the Schultz Substation, Kittitas, Yakima, Grant, and Benton Counties, Washington U.S. Environmental Protection Agency Environmental Impact Statements; Notice of Availability of the Schultz-Hanford Transmission Line Project Final Environmental Impact Statement, DOE/EIS-0325 (January 2003) (68 FR 5019) More Documents & Publications EIS-0318: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0323: EPA Notice of Availability of the Final

440

EA-1635: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

635: Finding of No Significant Impact 635: Finding of No Significant Impact EA-1635: Finding of No Significant Impact Williston to Tioga Transmission Line Project, North Dakota Basin Electric Power Cooperative (BEPC) proposes to construct and operate a new 230-kilovolt (kV) transmission line to meet existing and future electric power requirements in northwestern North Dakota, and to interconnect this new transmission line to the Western Area Power Administration's (Western) transmission system. The EA identified no potentially significant impacts to environmental resources resulting from either Western's Federal action or Basin Electric's Proposed Project. Finding of No Significant Impact for Williston to Tioga Transmission Line Project Pre-Approval Review, DOE/EA-1635 (May 2010) More Documents & Publications

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CX-008678: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

678: Categorical Exclusion Determination 678: Categorical Exclusion Determination CX-008678: Categorical Exclusion Determination Hot Springs Substation Gravity Drain Install CX(s) Applied: B4.6 Date: 07/19/2012 Location(s): Montana Offices(s): Bonneville Power Administration Install gravity drain system and oil stop valves, reshape west side perimeter ditch and flush out yard drains at the Hot Springs Substation. Using directional drilling equipment, approximately 3,644 linear feet of gravity drain line will be installed under the existing electrical manhole system located in the Hot Springs Substation 230 and 500 Kilovolt (kV) yards. Microsoft Word - CX-HotSpringsGravityDrainsFY12_WEB.doc More Documents & Publications EIS-0285-SA-81: Supplement Analysis CX-005010: Categorical Exclusion Determination

442

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Broader source: Energy.gov (indexed) [DOE]

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

443

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

444

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electrical Interconnection of the Windy Point Wind Energy Project Electrical Interconnection of the Windy Point Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS.1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the

445

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

446

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 30140 of 31,917 results. 31 - 30140 of 31,917 results. Download CX-010425: Categorical Exclusion Determination Pearl-Keeler Right-of-Way (ROW) Marking Project CX(s) Applied: B1.3 Date: 06/11/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010425-categorical-exclusion-determination Download CX-010427: Categorical Exclusion Determination Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010427-categorical-exclusion-determination Download CX-010428: Categorical Exclusion Determination Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon

447

PP-174.PDF  

Broader source: Energy.gov (indexed) [DOE]

IMPERIAL IRRIGATION DISTRICT IMPERIAL IRRIGATION DISTRICT ORDER NO. PP-174 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated February 17, 1998, Imperial Irrigation District (IID) applied to FE for a Presidential permit. IID proposed to expand its existing Bravo Substation in the vicinity of Calexico, California, by 5,825 square feet and to construct either 2,100 feet (Option 1) or 200 feet (Option 2) of 230-kilovolt (kV) transmission line

448

CX-005013: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

013: Categorical Exclusion Determination 013: Categorical Exclusion Determination CX-005013: Categorical Exclusion Determination Installing Fiber Optic Cables Between Bonneville Power Administration?s Ashe Substation and Energy Northwest?s Columbia Generating Station Date: 01/05/2011 Location(s): Benton County, Washington Office(s): Bonneville Power Administration About 200 feet of fiber optic cables will be installed on the structures of the current Bonneville Power Administration WNP-2-1 500 kilovolt (kV) transmission line. One new wood pole will be installed within the Columbia Generating Station (CGS) administrative area. The new pole location is in a heavily disturbed area. Auguring or digging would be planned to place the new pole. If the hole is excavated by a backhoe, disturbance would be

449

ENV IRONMENTA L REV  

Broader source: Energy.gov (indexed) [DOE]

ENV ENV IRONMENTA L REV IEW for CATEG ORI CA L EXC L US ION DETE RM I NATION Rocky Mounta in Regio n, \ Vestcrn Area Powe r Ad minist rat ion Archer 230·kV Bay Addition for New Poin t of Delivery - Stage 07 A. Brief Description of Pro pos al: Tri-State Generation and Transmission Association, Inc. (Tri-State), has requested an interconnection to Western Area Power Administration's (Western) Archer 23011 I5-Kilovolt (kV) Substation (Archer Substation). The Archer Substation is a Designated Point of Delivery from Western to Tri-State as set forth in Exhibit A of Contract No. 87-LAO-I72 (TS-89-0005), Finn Electric Service (Contract). The purpose of the request from Tri-State is to serve the load of its member cooperative, High West Energy. The request was made and is being considered under the provisions of the Contract.

450

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

451

Microsoft Word - Creston-Bell FONSI_final_external.docx  

Broader source: Energy.gov (indexed) [DOE]

1 1 Finding of No Significant Impact Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-4406 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Creston-Bell Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Proposed Action is to rebuild the 53.8-mile-long 115-kilovolt (kV) Creston-Bell transmission line, conduct work on access roads, and remove danger trees. The existing 53.8-mile-long transmission line was built in 1942 and extends east from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of

452

Microsoft Word - WWTR_FONSI05162011.doc  

Broader source: Energy.gov (indexed) [DOE]

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Finding of No Significant Impact May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Finding of No Significant Impact Walla Walla-Tucannon Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact and Floodplain Statement of Findings DOE EA-1731 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115- kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is

453

City of Hugoton, Kansas (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Hugoton, Kansas (Utility Company) Hugoton, Kansas (Utility Company) Jump to: navigation, search Name City of Hugoton Place Kansas Utility Id 9011 Utility Location Yes Ownership M NERC Location SPP Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png All-Electric inside city limits Residential All-Electric outside city limits Residential Commercial (Three Phase) inside city limits Commercial Commercial (Three Phase) outside city limits Commercial Commercial Large Power (Transformer size of 75 KvA or more) inside city

454

Data:D910241b-216d-4f54-988b-4a2c5087218a | Open Energy Information  

Open Energy Info (EERE)

0241b-216d-4f54-988b-4a2c5087218a 0241b-216d-4f54-988b-4a2c5087218a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: End date if known: Rate name: Cogeneration 35kV Backup Sector: Description: Excess kVA Source or reference: http://www.les.com/your_business/rate_schedules_llp.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

455

Roosevelt Public Power Dist | Open Energy Information  

Open Energy Info (EERE)

Public Power Dist Public Power Dist Place Nebraska Utility Id 16164 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Industrial 12.5 kv Industrial Large Commercial, OVER 50KVA Commercial Net Metering Residential Over 50 HP Irrigation Commercial Residential -General Purpose Residential Small 3 Phase Commercial Standby Commercial Standby Irrigation Commercial Time of Day- single phase Under 50 HP Irrigation Commercial Average Rates Residential: $0.1050/kWh Commercial: $0.1190/kWh Industrial: $0.1150/kWh

456

Enhancing fire safety at Hydro plants with dry transformers  

SciTech Connect (OSTI)

Hydroelectric plant owners and engineers can use dry-type transformers to reduce fire hazards in auxiliary power systems. The decision to replace a liquid-immersed transformer with a dry-type product has a price: higher unit cost and a need to be more vigilant in detailing transformer specifications. But, whether the change affects only one failed transformer or is part of a plant rehabilitation project, the benefits in safety can be worth it. Voltages on hydroelectric plant auxiliary power systems can range from a 20 kV medium-voltage system to the normal 480-208/120 V low-voltage system. Dry transformers typically are used in such systems to reduce the fire hazard present with liquid-filled transformers. For a hydro plant owner or engineer seeking alternatives to liquid-filled transformers, there are two main kinds of dry-type transformers to consider: vacuum pressure impregnated (VPI) and cast coil epoxy resin. VPI transformers normally are manufactured in sizes up to 6,000 kVA with primary voltage ratings up to 20 kV. Cast coil transformers can be made in sizes from 75 to 10,000 kVA, with primary voltage ratings up to 34,500 V. Although the same transformer theory applies to dry transformers as to liquid-filled units, the cooling medium, air, required different temperature rise ratings, dielectric tests, and construction techniques to ensure reliability. Consequently, the factory and field tests for dry units are established by a separate set of American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards. Cast coil transformers have several important advantages over VPI units.

Clemen, D.M. (Harza Engineering Company, Chicago, IL (United States))

1993-06-01T23:59:59.000Z

457

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

Court Orders Court Orders Imperial-Mexicali DEIS A-1 May 2004 APPENDIX A: COURT ORDERS Court Orders Imperial-Mexicali DEIS A-2 May 2004 Court Orders Imperial-Mexicali DEIS A-3 May 2004 APPENDIX A: COURT ORDERS This appendix contains the court orders issued on May 2, 2003, and July 8, 2003, by the United States District Court, Southern District of California (Case No. 02-CV-513-IEG (POR)), in the case of the Border Power Plant Working Group versus the U.S. Department of Energy and the Bureau of Land Management. Court Orders Imperial-Mexicali DEIS A-4 May 2004 Court Orders Imperial-Mexicali DEIS A-5 May 2004 Court Orders Imperial-Mexicali DEIS A-6 May 2004 Court Orders Imperial-Mexicali DEIS A-7 May 2004 Court Orders Imperial-Mexicali DEIS A-8 May 2004 Court Orders Imperial-Mexicali DEIS A-9 May 2004

458

Characterization of the CEBAF 100 kV DC GaAs Photoelectron Gun Vacuum System  

SciTech Connect (OSTI)

A vacuum system with pressure in the low ultra-high vacuum (UHV) range is essential for long photocathode lifetimes in DC high voltage GaAs photoguns. A discrepancy between predicted and measured base pressure in the CEBAF photoguns motivated this study of outgassing rates of three 304 stainless steel chambers with different pretreatments and pump speed measurements of non-evaporable getter (NEG) pumps. Outgassing rates were measured using two independent techniques. Lower outgassing rates were achieved by electropolishing and vacuum firing the chamber. The second part of the paper describes NEG pump speed measurements as a function of pressure through the lower part of the UHV range. Measured NEG pump speed is high at pressures above 5×10^?11 Torr, but may decrease at lower pressures depending on the interpretation of the data. The final section investigates the pump speed of a locally produced NEG coating applied to the vacuum chamber walls. These studies represent the first detailed vacuum measurements of CEBAF photogun vacuum chambers.

M.L. Stutzman; P. Adderley; J. Brittian; J. Clark; J. Grames; J. Hansknecht; G.R. Myneni; M. Poelker

2007-05-01T23:59:59.000Z

459

A SCR SWITCHED CAPACITOR VOLTAGE REGULATOR FOR 150 kV NEUTRAL BEAM POWER SUPPLY  

E-Print Network [OSTI]

2 ;;o c: REGULATOR BANK SCR TRIGGER CHASSIS BLOCK DIAGRAMLBL-8156 UC-20 A SCR SWITCHED CAPACITOR VOLTAGE REGULATORwill discharge through the SCR and the diodes. All of the

Milnes, K.A.

2011-01-01T23:59:59.000Z

460

2008. The Cartographic Section, Dept. of Geography, UWO /#19-09/kv To Spencer Hall  

E-Print Network [OSTI]

Campus Perth Drive Complex Eight Level Parkade Westminster College Siebens Centre West Valley Dental Sci

Lennard, William N.

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Voltage-gated potassium channel KCNV2 (Kv8.2) contributes to epilepsy susceptibility  

Science Journals Connector (OSTI)

...pnas.1017539108 Benjamin S. Jorge Courtney M. Campbell Alison R. Miller Elizabeth D. Rutter Christina A. Gurnett Carlos...2002 ) Relative expression software tool (REST) for group-wise comparison and statistical analysis of relative expression results...

Benjamin S. Jorge; Courtney M. Campbell; Alison R. Miller; Elizabeth D. Rutter; Christina A. Gurnett; Carlos G. Vanoye; Alfred L. George; Jr.; Jennifer A. Kearney

2011-01-01T23:59:59.000Z

462

EIS-0301: NRG Energy Services, Inc., Arizona-Baja California 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to approve NRG Energy, Inc. (NRG) for a Presidential permit to construct a 500,000-volt transmission line originating at the switchyard of the Palo Verde Nuclear Generating Station near Phoenix, Arizona, and extending approximately 177 miles to the southwest, where it would cross the United States (U.S.) border with Mexico in the vicinity of Calexico, California.

463

EIS-0159: Flatiron-Erie 115-kV Transmission Line  

Broader source: Energy.gov [DOE]

"The Western Area Power Administration proposes to build 27 new wood H-frame structures along the line, to replace or modify 45 of the existing structures and to remove 11 of them."

464

Revised Biological Assessment for the Carrizo-Midway 230kV Reconductor...  

Broader source: Energy.gov (indexed) [DOE]

suitable habitat due to agricultural conversion and urban development. Mineral and gasoil exploration and extraction and water banking activities also have affected significant...

465

DESIGN AND PSPICE SIMULATION OF A 150KV/300A/1S COAXIAL PULSE GENERATOR  

E-Print Network [OSTI]

.J. Barroso National Space Research Institute, PO Box 515, 12245-970 São José dos Campos, SP, Brazil e

466

Environmental Assessment for the USK Loop Line 230 kV Transmission Project.  

SciTech Connect (OSTI)

This Environmental Assessment (EA) covers the transmission/substation facilities that would be constructed or modified. It has been prepared by an interdisciplinary team, as well as through consultation on the Federal, state and local levels. It is subject to a 60-day review by the general public and other agencies and will generally coincide with the release of the final state EIS. This EA presents an expansion of those transmission-related discussions in the state EIS where BPA could undertake their construction or modifiction.

United States. Bonneville Power Administration.

1985-09-01T23:59:59.000Z

467

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

line. BPA's proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http:www.blm.govordistricts...

468

The Design of Partial Electric and Control System for 500kV Substation  

Science Journals Connector (OSTI)

The good design of the electric section in substation and its stable move may effect the electrical system of substation directly, this paper aim at the design of an electric primary section in substation and its...

Haimei Xiao; Lichun Shi

2012-01-01T23:59:59.000Z

469

Ferroresonant phenomena on 6- to 10-kV substation buses  

Science Journals Connector (OSTI)

Ferroresonance phenomena in distributing networks with an insulated neutral caused by electromagnetic measuring voltage transformers and connecting cables are studied. Procedures for limiting and nonadmission ...

N. A. Kolechitskaya; N. S. Lazarev; R. N. Shul’gara…

2013-04-01T23:59:59.000Z

470

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...  

Office of Environmental Management (EM)

of the following ways: Online at: http:www.blm.govordistrictsspokaneplansvph230.php. By email to: blmorvantagepomona@blm.gov (please specify Vantage to Pomona Heights...

471

EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability.

472

EIS-0100: Liberty-Coolidge 230-kV Transmission Line, Arizona  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with an upgrade of electrical transmission capability between the Liberty and Coolidge Substations.

473

EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

474

EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE started to prepare, jointly with the Montana Department of Environmental Quality (MDEQ), an EA that would also serve as a state EIS. The document would evaluate the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana. Based on comments received on the DOE Draft EA/MDEQ Draft EIS, DOE cancelled preparation of the EA and announced preparation of DOE/EIS-0399 (of the same title).

475

EIS-0399: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE, jointly with the Montana Department of Environmental Quality (MDEQ), prepared an EIS that evaluated the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana.

476

Operation experiences with a 30 kV/100 MVA high temperature superconducting cable system  

Science Journals Connector (OSTI)

A superconducting cable based on Bi-2223 tape technology has been developed, installed and operated in the public network of Copenhagen Energy in a two-year period between May 2001 and May 2003. This paper gives a brief overview of the system and analyses some of the operation experiences. The aim of this demonstration project is to gain experience with HTS cables under realistic conditions in a live distribution network. Approximately 50?000 utility customers have their electric power supplied through the HTS cable. The cable system has delivered 226 GW h of energy and reached a maximum operating current of 1157 A. The operation experiences include over-currents of 6 kA due to faults on peripheral lines, commissioning, servicing and failure responses on the cooling system, continuous 24 h, 7 day per week monitoring and performance of the alarm system. The implications of these experiences for the future applications of HTS cable systems are analysed.

Ole Tønnesen; Manfred Däumling; Kim H Jensen; Svend Kvorning; Søren K Olsen; Chresten Træholt; Erling Veje; Dag Willén; Jacob Østergaard

2004-01-01T23:59:59.000Z

477

Design and fault analysis of a 345KV 220 mile overhead transmission line.  

E-Print Network [OSTI]

??Efficient and reliable transmission of bulk power economically benefits both the power company and consumer. This report gives clarification to concept and procedure in design… (more)

Clawson, Greg

2012-01-01T23:59:59.000Z

478

3D Reconstruction of 138 KV Power-lines from Airborne LiDAR Data.  

E-Print Network [OSTI]

??Due to infrequent and imprecise maintenance inspection in power-line corridors, accidents can be caused by interferences, for instance, surrounding trees. Transmission power-line inspection conventionally relies… (more)

Xiang, Qing

2014-01-01T23:59:59.000Z

479

An SU(2) KvBLL caloron gas model and confinement  

E-Print Network [OSTI]

A semi-classical model is developed to describe pure SU(2) Yang-Mills gluodynamics at finite temperature as a dilute, non-interacting gas of Kraan-van Baal-Lee-Lu calorons including the case of non-trivial holonomy. Temperature dependent parameters of the model (asymptotic caloron holonomy, caloron density and caloron size distribution) are discussed from the point of view of lattice observations and of in-medium modifications of the one-loop caloron amplitude. Space-like string tensions running into plateaux at distances R \\approx 0.8 - 1.3 fm are obtained and compared to lattice results in order to find more precisely the average caloron size. Then, the quark-antiquark free energy as predicted by the model is considered. In the confined phase a linear rise with the separation can be observed up to R \\approx 4 fm, whereas it runs into plateaux above T_c. Screening effects in the adjoint potentials are observed together with an approximate Casimir scaling of the caloron contribution to the fundamental and adjoint forces. In Abelian projection, space-like percolation of monopoles is found in the confined phase only. Thus, taking the non-trivial holonomy into account, confinement properties of pure SU(2) Yang-Mills gluodynamics can be described by a semi-classical approach up to distances one order of magnitude larger than the caloron size.

P. Gerhold; E. -M. Ilgenfritz; M. Müller-Preussker

2006-07-28T23:59:59.000Z

480

Space charge measurements downwind from a monopolar 500 KV HVDC test line  

SciTech Connect (OSTI)

One quantity that helps describe the electrical environment in the vicinity of a HVDC line is space charge, a quantity that consists of charged air ions and charged aerosols. This paper describes measurements made at the Electric Power Research Institute's High Voltage Transmission Research Center (HVTRC) in Lenox, MA to determine the concentration of space charge present downwind of a HVDC test line and the influence of wind on the space charge level. The instrumentation used to make the measurements of space charge downwind of the line is also described.

Carter, P.J.; Johnson, G.B. (General Electric Co., EPRI-High Voltage Transmission, Research Center, Lenox, MA (US))

1988-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "kv kilovolts kva" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Aalborg Universitet Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems  

E-Print Network [OSTI]

system transients, transmission cable systems, protection and HVDC-VSC. E-mail: clb@et.aau.dk. desired

Bak, Claus Leth

482

Development and interrupting tests on 250KV 8KA HVDC circuit breaker  

SciTech Connect (OSTI)

This paper describes the circuit and component selections, development and equivalent circuit test results on an HVDC circuit breaker for an HVDC transmission line. A puffer type SF/sub 6/ gas interrupter for AC circuit breakers is utilized for interrupting DC current with injection of high-frequency inverse current from a commutating capacitor precharged to HVDC line voltage. Also, the effectiveness of application of the HVDC breaker to an HVDC system with two parallel transmission lines is demonstrated through the EMTP simulation.

Tokuyama, S.; Arimatsu, K.; Hirata, K.; Kato, Y.; Yoshioka, Y.

1985-09-01T23:59:59.000Z

483

Data:67bdd93b-66c5-4077-a153-d8bb79116d2c | Open Energy Information  

Open Energy Info (EERE)

bdd93b-66c5-4077-a153-d8bb79116d2c bdd93b-66c5-4077-a153-d8bb79116d2c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2011/07/01 End date if known: Rate name: SCHEDULE GQ GENERAL SERVICE - Over 15kV voltage Sector: Industrial Description: AVAILABILITY Available for single phase and three phase Service at standard Cooperative voltage. The standard voltage available depends upon the location, character and size of the consumer's load. This information can be furnished at any of the Cooperative's offices. Service shall not be available for Standby or Maintenance Service such as that required for alternative generation facilities. Available to all Member/Consumers of this class within the new service territory acquired from Potomac Edison Company. Demand Charge(distribution): Minimum kw @$0.99 per kw All kw in excess of 7.5 measured as set forth under "Determination of Capacity" @$0.77 per kw Demand Charge(Supply) Minimum kw @$1.85 per kw All kw in excess of 7.5 measured as set forth under "Determination of Capacity" @$1.44 per kw Voltage Discount (kw) (a)2kv to 15 kv @$0.25 per kw (b)Over 15 kv @$0.50 per kw RKVA Charge: (a)Reactive kilovolt-ampere charge is applied to the Consumer's rkva capacity requirement in excess of 25% of the Consumer's kilowatt capacity. Billing rkva @$0.40 per rkva

484

Data:4feffd3c-faf7-4924-9e51-952fcbe9a4a1 | Open Energy Information  

Open Energy Info (EERE)

feffd3c-faf7-4924-9e51-952fcbe9a4a1 feffd3c-faf7-4924-9e51-952fcbe9a4a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2011/07/01 End date if known: Rate name: SCHEDULE CQ GENERAL SERVICE Sector: Industrial Description: AVAILABILITY Available only at accounts served as of October 1, 1993 for single phase and three phase Service at standard Cooperative voltage. The standard voltage available depends upon the location, character and size of the consumer's load. This information can be furnished at any of the Cooperative's offices. Service shall not be available for Standby or Maintenance Service such as that required for alternative generation facilities. Available to all Member/Consumers of this class within the new service territory acquired from Potomac Edison Company. Voltage Discount (kw) (a)2kv to 15 kv @$0.25 per kw RKVA Charge: (a)Reactive kilovolt-ampere charge is applied to the Consumer's rkva capacity requirement in excess of 25% of the Consumer's kilowatt capacity. Billing rkva @$0.40 per rkva

485

ENVIRONM ENTAL REVI  

Broader source: Energy.gov (indexed) [DOE]

ENTAL REVI ENTAL REVI EW fo r CATEGO RI CA L EXCL USION DETERM I NATI ON Roc ky Mo unta in Region, Western Area Po" cr Administra ti on To rrin gton -Wild cat 69-kV Tra nsmission Line Rebui ld Project, Gos hen Co un ty, Wyo min g A. Hricf Descripti on of Proposa l: Western Area PO\\<'er Administration (Western) proposes to replace three structures (19-4. 19-5. and 19-6) with three new structures on its existing Torrington- Wildcat 69-kilovolt (kV) transmission line in Goshen County, Wyoming. The action is undertaken at the request of the Wyoming Department of Transportation (WYDOT). Western's proposed action is a component of the larger WYDOT Torrington Urban Projects. The WYDOT project would realign. widen. and improve U.S. Highway (U.S.) 85, U.S. 26. and U.S. 26/85 in the southern part of the City of Torrington. WY. Western's

486

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Routine Maintenance of Curecanti-Lost Canyon 230-kV Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado 1 A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles). The project is located on private, U.S. Bureau of Land Management (BLM), State of Colorado, and U.S. Forest Service (USFS) lands in Montrose, Ouray, San Miguel, Dolores, and Montezuma

487

One West Third Street Tulsa, Oklahoma  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ronnie McCarty Ronnie McCarty Lineman Gore Maintenance Special thanks to: SWPA Christine Bax Marshall Boyken Michael Brairton Tom Green Sean Long Beth Nielsen Carrie Quick Dave Sargent Carlos Valencia Danny Wright CNI/Bearskin Shane Brewer Vicki Clarke Ruben Garcia William Hiller Kathy O'Neal U P DAT E S O U T H W E S T E R N P O W E R A D M I N I S T R A T I O N O C T O B E R - D E C E M B E R 2 0 0 9 69-kV System Repaired & Enhanced Southwestern has replaced approximately 170 transmission structures on Line 3320 between New Madrid and Malden, Missouri, over the last three months in order to accommodate new 69-kilovolt (kV) conductors that will provide additional capacity and improve system reliability in the bootheel region. Following the devastation of the January 2009 ice storm that plowed through northern Arkansas and

488

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Boysen-Thermopolis 115-kV Transmission Line Structm·e 15/6 Pole Replacement Project Boysen-Thermopolis 115-kV Transmission Line Structm·e 15/6 Pole Replacement Project Fremont County, Wyoming A. Brief Description of Pt·ouosal: Western Area Power Administration (Western) proposes to replace the poles at Structure 15/6 on its existing Boysen-Thermopolis 115-kilovolt (k V) transmission line in Fremont County, Wyoming. This undertaking will involve the replacement of both of the poles, the wooden H-frame structure, and construction of a landing. A short portion of an existing access road will be improved to allow safe passage of rubber-tired auger truck and bucket truck to Structure 15/6. The pole replacement process involves minimal to moderate ground disturbance; the faulty pole is lifted out of the ground using a hydraulic jack and a rubber-tired truck-mounted auger is used to

489

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Boysen-Thermopolis 115-kV Transmission Line Structm·e 15/6 Pole Replacement Project Boysen-Thermopolis 115-kV Transmission Line Structm·e 15/6 Pole Replacement Project Fremont County, Wyoming A. Brief Description of Pt·ouosal: Western Area Power Administration (Western) proposes to replace the poles at Structure 15/6 on its existing Boysen-Thermopolis 115-kilovolt (k V) transmission line in Fremont County, Wyoming. This undertaking will involve the replacement of both of the poles, the wooden H-frame structure, and construction of a landing. A short portion of an existing access road will be improved to allow safe passage of rubber-tired auger truck and bucket truck to Structure 15/6. The pole replacement process involves minimal to moderate ground disturbance; the faulty pole is lifted out of the ground using a hydraulic jack and a rubber-tired truck-mounted auger is used to

490

Electric Power Delivery Testing Feasibility Study Task 6 Final Report  

SciTech Connect (OSTI)

This Final Report is covers the completion of the Electric Power Delivery Testing Feasibility Study. The objective of this project was to research, engineer, and demonstrate high-power laboratory testing protocols to accurately reproduce the conditions on the electric power grid representing both normal load switching and abnormalities such as short-circuit fault protection. Test circuits, equipment, and techniques were developed and proven at reduced power levels to determine the feasibility of building a large-scale high-power testing laboratory capable of testing equipment and systems at simulated high-power conditions of the U.S. power grid at distribution levels up through 38 kiloVolts (kV) and transmission levels up through 230 kV. The project delivered demonstrated testing techniques, high-voltage test equipment for load testing and synthetic short-circuit testing, and recommended designs for future implementation of a high-power testing laboratory to test equipment and systems, enabling increased reliability of the electric transmission and distribution grid.

Thomas Tobin

2009-07-01T23:59:59.000Z

491

U.S. Department of Energy Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Provide Electrical Power for New Tool Storage Building and Portable Crew Shacks Provide Electrical Power for New Tool Storage Building and Portable Crew Shacks Savannah River Site Aiken/Aiken/South Carolina Provide power source for the New Tool Storage Building 217-6H and the Portable Crew Shacks located in the H-Tank Farm area. Provides design for a new transformer bank consisting of (3) three - 13.8kV-208Y/120, 1-Phase, 50 kVA pole mounted transformers to provide such power. A new pole will be placed in line with the existing 13.8kV line, feeder 3B, near pole H3B548. A secondary feeder pole will be placed beside the transformer pole to mount the unistrut built rack, 600 amp disconnect and watthour meter can. There will be a secondary pole placed near the Tool Shed and Crew Shacks to support the overhead secondary feeder cables. The pole being place near the Shed will have a unistrut

492

Data:Ae5dc3a3-3a78-40ff-8942-7f5ba1a7d6d1 | Open Energy Information  

Open Energy Info (EERE)

dc3a3-3a78-40ff-8942-7f5ba1a7d6d1 dc3a3-3a78-40ff-8942-7f5ba1a7d6d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Moon Lake Electric Assn Inc Effective date: 2000/07/01 End date if known: Rate name: Large Power Secondary Service Sector: Industrial Description: AVAILABILITY: Available to Consumers located on or near Association's primary lines of adequate capacity for single-phase or three-phase service at 7.2/12.47 KV or 14.4/24.9 KV to Consumers who furnish and maintain their own transformers, subject to the established rules and regulations of Association. Service under this schedule is limited to consumers whose load requirements exceed 50 kVa of transformer capacity. This rate not for resale.

493

Data:7fd76557-74b7-4491-bcac-ec832839396f | Open Energy Information  

Open Energy Info (EERE)

6557-74b7-4491-bcac-ec832839396f 6557-74b7-4491-bcac-ec832839396f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Moon Lake Electric Assn Inc Effective date: 2000/07/01 End date if known: Rate name: Large Power Primary Service Sector: Industrial Description: AVAILABILITY: Available to Consumers located on or near Association's primary lines of adequate capacity for single-phase or three-phase service at 7.2/12.47 KV or 14.4/24.9 KV to Consumers who furnish and maintain their own transformers, subject to the established rules and regulations of Association. Service under this schedule is limited to consumers whose load requirements exceed 50 kVa of transformer capacity. This rate not for resale.

494

EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance, and Connection of either 230-kilovolt or a 500-kilovolt Electric Transmission Line Crossing U.S.-Mexico Border

495

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--The smart grid paradigm is set to revolutionize  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) from tens of kilovolts to hundreds of kilovolts for transmission of bulk energy over long distances

Atkinson, Robert C

496

A Western Perspective on Energy: A Plea for Rational Energy Planning  

Science Journals Connector (OSTI)

...optimum use of substantial portions ofthe...suggest some changes in it. This...2. Draft EIS-The Energy...500 Kilovolt Transmission Lines and Asso-ciated...500 Kilovolt Transmission Lines and Associated...

Bill Christiansen; Theodore H. Clack Jr.

1976-11-05T23:59:59.000Z

497

Data:596d5752-389f-4b75-8dbb-9d4f0845d437 | Open Energy Information  

Open Energy Info (EERE)

Industrial, Lighting and Power, Single Phase Service that is 120-240 volts. 1-25 KVA Transformer minimum is 40.00 plus tax 50 KVA Transformer minimum is 50.00 plus tax Source or...

498

Data:C4eacf8c-77e0-493f-ab4e-57c4a71f35f3 | Open Energy Information  

Open Energy Info (EERE)

rate except there is a water heater control credit of 5.00 each month. 1-25 KVA Transformer minimum is 40.00 plus tax 50 KVA Transformer minimum is 50.00 plus tax Source or...

499

Data:8547f4de-0f39-4d7b-a331-e2449ca09d0d | Open Energy Information  

Open Energy Info (EERE)

single-phase service (not a Small Commercial) that is 120-240 volts. 1-25 KVA Transformer minimum is 40.00 plus tax 50 KVA Transformer minimum is 50.00 plus tax Source or...

500

Data:11f510ef-b1b7-4c94-a02a-e8a93e12e2c3 | Open Energy Information  

Open Energy Info (EERE)

lighting, heating, and power, which necessitates the installation of 50 kVA or less transformer capacity. Single-phase loads requiring more than 50 kVA transformer capacity shall...