National Library of Energy BETA

Sample records for kv frcc mro

  1. Property:EIA/861/NercFrcc | Open Energy Information

    Open Energy Info (EERE)

    Description: Nerc Frcc Entity conducts business operations within the FRCC region (Y or N) 1 References EIA Form EIA-861 Final Data File for 2008 - F861 File...

  2. ,"Table 3B.1. FRCC Monthly Peak Hour Demand, by North American...

    U.S. Energy Information Administration (EIA) Indexed Site

    B.1. FRCC Monthly Peak Hour Demand, by North American Electric Reliability Corporation ... 3B.2. NPCC Monthly Peak Hour Demand, by North American Electric Reliability Corporation ...

  3. CoMRoS: Cooperative mobile robots Stuttgart

    SciTech Connect (OSTI)

    Braeunl, T.; Kalbacher, M.; Levi, P.; Mamier, G.

    1996-12-31

    Project CoMRoS has the goal to develop intelligent cooperating mobile robots. Several different vehicles are to solve a single task autonomously by exchanging plans without a central control. We use {open_quotes}Robuter II{close_quotes} vehicles from Robosoft France, adapted to our needs. The standard vehicle has very little local intelligence (VME bus system) and is controlled remotely by wireless Ethernet for sending steering commands and receiving sonar sensor data. A wireless video link is used to transmit camera images. Data exchange between vehicles is then performed among the corresponding workstations. The remote control is basically used to simplify testing and debugging of robot programs. However, each vehicle can also be driven completely autonomous by using a laptop PC.

  4. 500 kV Spare Transformer Procurement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurement capital project is for the acquisition of five, 500 kV spare transformers, which are to be strategically located throughout the system, and for the...

  5. SAS Output

    Gasoline and Diesel Fuel Update (EIA)

    A. U.S. Transmission Circuit Outages by Type and NERC region, 2013 Outage Type FRCC MRO NPCC RFC SERC SPP TRE WECC Contiguous U.S. Circuit Outage Counts Automatic Outages...

  6. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of McNary Group 2 - Big Eddy to Knight The Big Eddy - Knight 500 kV line and new substation (WOMR Group 2) project is one of five projects recommended out of the 2008 Cluster...

  7. INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS Eaton Corporation - Arden, NC A 15 ...

  8. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line ...

  9. 0.4 kV remote control (Smart Grid Project) | Open Energy Information

    Open Energy Info (EERE)

    .4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392, 9.501785 Loading map......

  10. 220 kV SSSC device for power flow control (Smart Grid Project...

    Open Energy Info (EERE)

    20 kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location...

  11. ETM (Distribution Network Automation on 10 kV cable line stations...

    Open Energy Info (EERE)

    ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

  12. winter_peak_2005.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    2b . Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, 2005 and Projected 2006 through 2010 (Megawatts and 2005 Base Year) Winter Noncoincident Peak Load Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP ERCOT WECC (U.S.) 2005/2006 626,365 42,657 33,748 46,828 151,600 164,638 31,260 48,141 107,493 Contiguous U.S. Projected FRCC MRO (U.S.) NPCC (U.S.)

  13. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  14. Further Notice of 230kV Circuit Planned Outages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages

  15. Wild Horse 69-kV transmission line environmental assessment

    SciTech Connect (OSTI)

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

  16. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To ... The next planned outage on 23106 high voltage circuit between xxxxxxx xx xxxx and ...

  17. Notification of Planned 230kV Outage at Potomac River Generating...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  18. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...

    Energy Savers [EERE]

    BPA's proposed action is to interconnect the proposed transmission line to an existing BPA substation. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project Public ...

  19. Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation

    SciTech Connect (OSTI)

    Ohler, C.K.

    1991-05-21

    The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

  20. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  1. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    SciTech Connect (OSTI)

    Kelley, Nathan; Corsaro, Pietro

    2004-12-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

  2. Notification of Planned 230kV Outage at Potomac River Generating Station |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3, 2007 and will begin at 4:00 AM with a scheduled return date of Saturday, June 9, 2007 at 2:00 PM. Notification of Planned 230kV Outage at Potomac River Generating Station (34.76 KB) More Documents & Publications Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned

  3. Use of Static Compensators for Voltage Control at 330- and 500-kV Substations

    SciTech Connect (OSTI)

    Dement'ev, Yu. A.; Kochkin, V. I.; Idiatullov, R. M.; Papafanasopulo, S. G.; Smirnov, A. A.; Smirnov, S. G.

    2003-05-15

    A scheme for compensating the reactive power and controlling the voltage of high-voltage, intermediate-voltage, and low-voltage buses of 330 - 500-kV substations, which consist of static thyristor compensators (STC) on low-voltage autotransformers and controlled shunting reactors on high-voltage lines, is presented. It is shown that the STC can be created step-by-step beginning with the reactive part on substations with low-loaded lines. Results of installation of reactor groups of STC stepwise-controlled by vacuum switches at 330- and 500-kV substations are presented. Tests of the reactor groups have proved their high efficiency.

  4. EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

  5. Compact 180-kV Marx generator triggered in atmospheric air by femtosecond laser filaments

    SciTech Connect (OSTI)

    Arantchouk, L. Larour, J.; Point, G.; Brelet, Y.; Carbonnel, J.; Andr, Y.-B.; Mysyrowicz, A.; Houard, A.

    2014-03-10

    We developed a compact Marx generator triggered in atmospheric air by a single femtosecond laser beam undergoing filamentation. Voltage pulses of 180?kV could be generated with a subnanosecond jitter. The same laser beam was also used to initiate simultaneously guided discharges up to 21?cm long at the output of the generator.

  6. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  7. Design and performance of a 30 KV electron gun with ten independent cathodes & a magnetic lens.

    SciTech Connect (OSTI)

    Rudys, Joseph Matthew; Reed, Kim Warren

    2006-08-01

    Measurements on a 30 kV electron gun with ten independent cathodes, operating in a 6.5 Tesla (T) magnetic field are presented. An earlier paper covered the design of this electron gun [1]. Experimental results are compared to model predictions. Beam current is compared to theoretical space charge limited flow.

  8. Written Statement of Stacy Dochoda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FRCC physical characteristics The unique geography of the FRCC region along with the interdependence of the FRCC member systems has required close coordination of FRCC member ...

  9. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  10. Design and Overview of 100 kV Bushing for the DNB Injector of ITER

    SciTech Connect (OSTI)

    Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

    2011-09-26

    The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

  11. Results of measuring input capacitance in 35-750 kV transformers and reactors

    SciTech Connect (OSTI)

    Vol'pov, K.D.; Sozinov, A.V.; Khalilov, F.Kh.

    1982-09-01

    The effect of the neutral grounding mode on input capacitance of 110-120 kV transformers was studied, inasmuch as in the system the neutral for a portion of the transformers was not grounded, with the objective of limiting nonsymmetrical short-circuit currents. Measurements showed that the input capacitance with a grounded neutral, as a rule, is greater than with an insulated neutral.

  12. EIS-0365: Imperial-Mexicali 230-kV Transmission Lines

    Broader source: Energy.gov [DOE]

    On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

  13. Environmental studies for a 1100-kV power line in Oregon. A special report

    SciTech Connect (OSTI)

    Rogers, L.; Hinds, R.

    1983-01-01

    In the first research project to monitor the effects of 1100-kV transmission on a natural ecosystem, researchers at Battelle, Pacific Northwest Laboratories have studied responses of wildlife, native plants, honeybees, and agricultural crops and cattle. No adverse effects were detected on wildlife, crops or cattle. Effects were observed on trees growing within the defined right of way and on honeybee colonies placed beneath the line.

  14. INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS

    Broader source: Energy.gov [DOE]

    Eaton Corporation – Arden, NC A 15 kilovolt (kV) SiC variable-speed drive will be integrated with a high-speed megawatt motor for gas compression applications. This new drive technology will be developed and tested to operate at greater than 99% efficiency and achieve 10 times the power density of competing drives, providing an integrated, highly-efficient motor and drive system for natural gas applications. Fact sheet coming soon.

  15. A 6 kV arbitrary waveform generator for the Tevatron Electron Lens

    SciTech Connect (OSTI)

    Pfeffer, H.; Saewert, G.

    2011-11-09

    This paper reports on a 6 kV modulator built and installed at Fermilab to drive the electron gun anode for the Tevatron Electron Lens (TEL). The TEL was built with the intention of shifting the individual (anti)proton bunch tunes to even out the tune spread among all 36 bunches with the desire of improving Tevatron integrated luminosity. This modulator is essentially a 6 kV arbitrary waveform generator that enables the TEL to define the electron beam intensity on a bunch-by-bunch basis. A voltage waveform is constructed having a 7 μs duration that corresponds to the tune shift requirements of a 12-bunch (anti)proton beam pulse train. This waveform is played out for any one or all three bunch trains in the Tevatron. The programmed waveform voltages transition to different levels at time intervals corresponding to the 395 ns bunch spacing. In addition, complex voltage waveforms can be played out at a sustained rate of 143 kHz over the full 6 kV output range. This paper describes the novel design of the inductive adder topology employing five transformers. It describes the design aspects that minimize switching losses for this multi-kilovolt, high repetition rate and high duty factor application.

  16. A 120kV IGBT modulator for driving a pierce electron gun

    SciTech Connect (OSTI)

    Earley, L. M.; Brown, R. W.; Carlson, R. L.; Ferguson, P.; Haynes, W. B.; Kirbie, H. C.; Russell, S. J.; Sigler, F. E.; Smirnova, E. I.; Wheat, R. M.

    2004-01-01

    An IGBT modulator has been developed to drive a 120 kV, 23 A Pierce electron gun. The modulator is capable of producing pulses up to 10 {mu}s in width at repetition rates up to 10Hz with no active reset. The pulse rise time on the electron gun will be approximately 2 {mu}s and the remaining 8 {mu}s of flattop is tuned to have a ripple of less than 1 percent rms. The modulator technology was developed from a previous 50 kV prototype. The modulator consists of six boards, each with one EUPEC IGBT that drives a single common step-up transformer wound on METGLAS 2605SC cores. The six transformer cores share a common bi-filar output secondary winding. The modulator uses a fiber optic trigger system and has a high voltage cable output with an epoxy receptacle on the oil end and a ceramic receptacle on the vacuum end. The 120 kV electron gun was manufactured by MDS Co. and will be used to generate sheet electron beams from the standard pencil beam produced by the Pierce electron gun.

  17. A 6 kV arbitrary waveform generator for the Tevatron Electron Lens

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Pfeffer, H.; Saewert, G.

    2011-11-09

    This paper reports on a 6 kV modulator built and installed at Fermilab to drive the electron gun anode for the Tevatron Electron Lens (TEL). The TEL was built with the intention of shifting the individual (anti)proton bunch tunes to even out the tune spread among all 36 bunches with the desire of improving Tevatron integrated luminosity. This modulator is essentially a 6 kV arbitrary waveform generator that enables the TEL to define the electron beam intensity on a bunch-by-bunch basis. A voltage waveform is constructed having a 7 μs duration that corresponds to the tune shift requirements of amore » 12-bunch (anti)proton beam pulse train. This waveform is played out for any one or all three bunch trains in the Tevatron. The programmed waveform voltages transition to different levels at time intervals corresponding to the 395 ns bunch spacing. In addition, complex voltage waveforms can be played out at a sustained rate of 143 kHz over the full 6 kV output range. This paper describes the novel design of the inductive adder topology employing five transformers. It describes the design aspects that minimize switching losses for this multi-kilovolt, high repetition rate and high duty factor application.« less

  18. A Study of Electromagnetic Radiation of Corona Discharge Near 500-Kv Electric Installations

    SciTech Connect (OSTI)

    Korzhov, A. V.; Okrainskaya, I. S.; Sidorov, A. I.; Kufel'd, V. D.

    2004-01-15

    Data on the spectral composition and intensity of electromagnetic radiation of corona discharge are obtained in an experimental study performed on the outdoor switchgear of the Shagol 500-kV substation of the Chelyabinsk Enterprise of Trunk Transmission Grids and under a 500-kV Shagol - Kozyrevo overhead transmission line. The electromagnetic environment on the territory of the 500-kV outdoor switchgear is shown to be determined by narrow-band radiations (harmonics of the frequency of electric supply) and wide-band radiations due to corona discharges of high-voltage sources. This means that the personnel experience the action of a commercial-frequency electric field and electromagnetic radiation of a quite wide range, which is not allowed for by the existing guidelines. It is recommended to continue the study in cooperation with medical institutions in order to create guidelines that would allow for the joint action of commercial-frequency electric field and electromagnetic radiation and for the voltage in the line, the current load, the meteorological situation, and other factors.

  19. Poster Thur Eve 10: Partial kV CBCT, complete kV CBCT and EPID in breast treatment: a dose comparison study for skin, breasts, heart and lungs

    SciTech Connect (OSTI)

    Roussin, E; Archambault, L K; Wierzbicki, W

    2014-08-15

    The advantages of kilovoltage cone beam CT (kV CBCT) imaging over electronic portal imaging device (EPID) such as accurate 3D anatomy, soft tissue visualization, fast rigid registration and enhanced precision on patient positioning has lead to its increasing use in clinics. The benefits of this imaging technique are at the cost of increasing the dose to healthy surrounding organs. Our center has moved toward the use of daily partial rotation kV CBCT to restrict the dose to healthy tissues. This study aims to better quantify radiation doses from different image-guidance techniques such as tangential EPID, complete and partial kV CBCT for breast treatments. Cross-calibrated ionization chambers and kV calibrated Gafchromic films were used to measure the dose to the heart, lungs, breasts and skin. It was found that performing partial kV CBCT decreases the heart dose by about 36%, the lungs dose by 31%, the contralateral breast dose by 41% and the ipsilateral breast dose by 43% when compared to a full rotation CBCT. The skin dose measured for a full rotation CBCT was about 0.8 cGy for the contralateral breast and about 0.3 cGy for the ipsilateral breast. The study is still ongoing and results on skin doses for partial rotation kV CBCT as well as for tangential EPID images are upcoming.

  20. Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-09

    BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability

  1. summer_nid_cr_cm_2005.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    d Form EIA-411 for 2005 Released: February 7, 2008 Next Update: October 2007 Table 4. Summer Historic and Projected Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Council Region, 2005 and 2006 through 2010 (Megawatts and Percent) Projected Year Base Year Summer Eastern Power Grid Contiguous U.S. FRCC MRO NPCC RFC Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity Resources (MW)

  2. Next Update: November 2016 Geographic Area Capacity In-Service

    U.S. Energy Information Administration (EIA) Indexed Site

    Geographic Area Capacity In-Service Data Year NERC Region Type Operating (kV) Design (kV) Rating (MVa) Month/Year From Terminal To Terminal Length (Miles) Type Company Code Company Name Organizational Type Ownership (Percent) Project Name Level of Certainty Primary Driver 1 Primary Driver 2 2014 FRCC AC 200-299 115 460 1/2016 SUB 4 230.00 SUB 7 230.00 3.8 OH 18445 of Tallahassee M 100% 0.00 - SUB 7 230.00 Under Constructio Reliability 2014 FRCC AC 100-120 115 232 12/2016 Sub 14 115 Sub 7 115 6.0

  3. Environmental assessment: Warren Air Force Base 115-kV transmission line, Cheyenne, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Western Area Power Administration (Western), is propsoing to construct a new electrical tranmission line and substation in southeastern Wyoming. This proposed line, called the Warren Air Force Base Tranmission Line, will supply power for Western's system to Francis E.Warren Air Force Base (F.E. Warren AFB) near Cheyenne. It would allow for increased tranmission capacity to the air base. F.E. Warren AFB currently is served electrically be Western via a 13.8-kv line. It is a wood-pole, double-circuit line without an overhead ground wire, which extends from Western's Cheyenne Substation, through an urban area, and onto the air base. The Cheyenne Substation is located on the south side of the city of Cheyenne. The electrical load on the base is increasing from 4 megawatts (MW) to 11 or 12 MW, an approximate three-fold increase. Voltage problems occasionally occur at the base due to the present electrial loads and to the age and inadequacy of the 13.8-kv line, which was placed in service in 1941. The existing line has served beyond its designed service life and requires replacement. Replacement would be necessary even without an increasing load. F.E. Warren AFB has several new and expanding programs, including additional housing, shopping centers, and the Peacekeeper Missile Program. Part of this expansion already has occured; the remainder is expected by early 1988. This expansion has created the need for additional electrical service. The present 13.8-kV line is not capable of supporting the additional load. 28 refs., 4 figs., 2 tabs.

  4. Collimated electron beam accelerated at 12 kV from a Penning discharge

    SciTech Connect (OSTI)

    Toader, D.; Oane, M.; Ticoş, C. M.

    2015-01-15

    A pulsed electron beam accelerated at 12 kV with a duration of 40 μs per pulse is obtained from a Penning discharge with a hollow anode and two cathodes. The electrons are extracted through a hole in one of the cathodes and focused by a pair of coils. The electron beam has a diameter of a few mm in the cross section, while the beam current reaches peak values of 400 mA, depending on the magnetic field inside the focussing coils. This relatively inexpensive and compact device is suitable for the irradiation of small material samples placed in high vacuum.

  5. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  6. Metal artifact correction for x-ray computed tomography using kV and selective MV imaging

    SciTech Connect (OSTI)

    Wu, Meng; Keil, Andreas; Constantin, Dragos; Star-Lack, Josh; Zhu, Lei; Fahrig, Rebecca

    2014-12-15

    Purpose: The overall goal of this work is to improve the computed tomography (CT) image quality for patients with metal implants or fillings by completing the missing kilovoltage (kV) projection data with selectively acquired megavoltage (MV) data that do not suffer from photon starvation. When both of these imaging systems, which are available on current radiotherapy devices, are used, metal streak artifacts are avoided, and the soft-tissue contrast is restored, even for regions in which the kV data cannot contribute any information. Methods: Three image-reconstruction methods, including two filtered back-projection (FBP)-based analytic methods and one iterative method, for combining kV and MV projection data from the two on-board imaging systems of a radiotherapy device are presented in this work. The analytic reconstruction methods modify the MV data based on the information in the projection or image domains and then patch the data onto the kV projections for a FBP reconstruction. In the iterative reconstruction, the authors used dual-energy (DE) penalized weighted least-squares (PWLS) methods to simultaneously combine the kV/MV data and perform the reconstruction. Results: The authors compared kV/MV reconstructions to kV-only reconstructions using a dental phantom with fillings and a hip-implant numerical phantom. Simulation results indicated that dual-energy sinogram patch FBP and the modified dual-energy PWLS method can successfully suppress metal streak artifacts and restore information lost due to photon starvation in the kV projections. The root-mean-square errors of soft-tissue patterns obtained using combined kV/MV data are 10–15 Hounsfield units smaller than those of the kV-only images, and the structural similarity index measure also indicates a 5%–10% improvement in the image quality. The added dose from the MV scan is much less than the dose from the kV scan if a high efficiency MV detector is assumed. Conclusions: The authors have shown that it

  7. Long-term stability and mechanical characteristics of kV digital imaging system for proton radiotherapy

    SciTech Connect (OSTI)

    Zhu, Mingyao Botticello, Thomas; Lu, Hsiao-Ming; Winey, Brian

    2014-04-15

    Purpose: To quantitatively evaluate the long-term image panel positioning stability and gantry angle dependence for gantry-mounted kV imaging systems. Methods: For patient setup digital imaging systems in isocentric rotating proton beam delivery facilities, physical crosshairs are commonly inserted into the snout to define the kV x-ray beam isocenter. Utilizing an automatic detection algorithm, the authors analyzed the crosshair center positions in 2744 patient setup kV images acquired with the four imagers in two treatment rooms from January 2012 to January 2013. The crosshair position was used as a surrogate for imaging panel position, and its long-term stability at the four cardinal angles and the panel flex dependency on gantry angle was investigated. Results: The standard deviation of the panel position distributions was within 0.32 mm (with the range of variation less than ± 1.4 mm) in both the X-Z plane and Y direction. The mean panel inplane rotations were not more than 0.51° for the four panels at the cardinal angles, with standard deviations ≤0.26°. The panel position variations with gantry rotation due to gravity (flex) were within ±4 mm, and were panel-specific. Conclusions: The authors demonstrated that the kV image panel positions in our proton treatment system were highly reproducible at the cardinal angles over 13 months and also that the panel positions can be correlated to gantry angles. This result indicates that the kV image panel positions are stable over time; the amount of panel sag is predictable during gantry rotation and the physical crosshair for kV imaging may eventually be removed, with the imaging beam isocenter position routinely verified by adequate quality assurance procedures and measurements.

  8. New 500-kV Ion Source Test Strand for HIF

    SciTech Connect (OSTI)

    Sangster, T.C.; Ahle, L.E.; Halaxa, E.F.; Karpenko, V.P.; Oldaker, M.E.; Mitchell, J.W.; Beck, D.N.; Bieniosek, F.M.; Henestroza, E.; Kwan, J.W.

    2000-03-09

    One of the most challenging aspects of ion beam driven inertial fusion energy is the reliable and efficient generation of low emittance, high current ion beams. The primary ion source requirements include a rise time of order 1-{micro}sec, a pulse width of at least 20-{micro}sec, a flattop ripple of less than 0.1% and a repetition rate of at least 5-HZ. Naturally, at such a repetition rate, the duty cycle of the source must be greater than 10{sup 8} pulses. Although these specifications do not appear to exceed the state-of-the-art for pulsed power, considerable effort remains to develop a suitable high current ion source. Therefore, we are constructing a 500-kV test stand specifically for studying various ion source concepts including surface, plasma and metal vapor arc. This paper will describe the test stand design specifications as well as the details of the various subsystems and components.

  9. A New 500-kV Ion Source Test Stand for HIF

    SciTech Connect (OSTI)

    Sangster, T.C.; Ahle, L.E.; Halaxa, E.F.; Karpenko, V.P.; Oldaker, M. E.; Mitchell, J.W.; Beck, D.N.; Bieniosek, F.M.; Henestroza, E.; Kwan, J.W.

    2000-10-05

    One of the most challenging aspects of ion beam driven inertial fusion energy is the reliable and efficient generation of low emittance, high current ion beams. The primary ion source requirements include a rise time of order 1-msec, a pulse width of at least 20-msec, a flattop ripple of less than 0.1% and a repetition rate of at least 5-Hz. Naturally, at such a repetition rate, the duty cycle of the source must be greater than 108 pulses. Although these specifications do not appear to exceed the state-of-the-art for pulsed power, considerable effort remains to develop a suitable high current ion source. Therefore, we are constructing a 500-kV test stand specifically for studying various ion source concepts including surface, plasma and metal vapor arc. This paper will describe the test stand design specifications as well as the details of the various subsystems and components.

  10. Final environmental assessment: Los Reales 115 kV transmission line alternative routes

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

  11. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kV transmission line in Washington State. BPA’s proposed action is to interconnect the proposed transmission line to an existing BPA substation.

  12. Theoretical investigation of the design and performance of a dual energy (kV and MV) radiotherapy imager

    SciTech Connect (OSTI)

    Liu, Langechuan; Antonuk, Larry E. El-Mohri, Youcef; Zhao, Qihua; Jiang, Hao

    2015-04-15

    Purpose: In modern radiotherapy treatment rooms, megavoltage (MV) portal imaging and kilovoltage (kV) cone-beam CT (CBCT) imaging are performed using various active matrix flat-panel imager (AMFPI) designs. To expand the clinical utility of MV and kV imaging, MV AMFPIs incorporating thick, segmented scintillators and, separately, kV imaging using a beams eye view geometry have been investigated by a number of groups. Motivated by these previous studies, it is of interest to explore to what extent it is possible to preserve the benefits of kV and MV imaging using a single AMFPI design, given the considerably different x ray energy spectra used for kV and MV imaging. In this paper, considerations for the design of such a dual energy imager are explored through examination of the performance of a variety of hypothetical AMFPIs based on x ray converters employing segmented scintillators. Methods: Contrast, noise, and contrast-to-noise ratio performances were characterized through simulation modeling of CBCT imaging, while modulation transfer function, Swank factor, and signal performance were characterized through simulation modeling of planar imaging. The simulations were based on a previously reported hybrid modeling technique (accounting for both radiation and optical effects), augmented through modeling of electronic additive noise. All designs employed BGO scintillator material with thicknesses ranging from 0.25 to 4 cm and element-to-element pitches ranging from 0.508 to 1.016 mm. A series of studies were performed under both kV and MV imaging conditions to determine the most advantageous imager configuration (involving front or rear x ray illumination and use of a mirror or black reflector), converter design (pitch and thickness), and operating mode (pitch-binning combination). Results: Under the assumptions of the present study, the most advantageous imager design was found to employ rear illumination of the converter in combination with a black reflector

  13. The 345 kV underground/underwater Long Island Sound cable project

    SciTech Connect (OSTI)

    Grzan, J.; Hahn, E.I. ); Casalaina, R.V.; Kansog, J.O.C. )

    1993-07-01

    A high voltage underground/underwater cable system was installed to increase the transmission capacity from the mainland of New York to Long Island. In terms of weight and diameter, the self-contained, fluid-filled (SCFF) cable used for the underwater portion of the project is the largest underwater cable in the world. The use of high-pressure, fluid-filled (HPFF) pipe-type cable on the land portion represents the largest application of paper-polypropylene-paper (PPP) insulated cable in the United States. State-of-the-art technologies were implemented in the use of fiber optic cables for relay protection and SCADA/RTU, temperature monitoring and leak detection systems, SF[sub 6] gas-insulated substations, and underwater cable laying and embedment techniques. This paper discusses the design and installation of a 750 MVA, 43 km (26.6 mi), 345 kV underground/underwater electric transmission system installed by the New York Power Authority (NYPA).

  14. 1.9 kV AlGaN/GaN Lateral Schottky Barrier Diodes on Silicon

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhu, Mingda; Song, Bo; Qi, Meng; Hu, Zongyang; Nomoto, Kazuki; Yan, Xiaodong; Cao, Yu; Johnson, Wayne; Kohn, Erhard; Jena, Debdeep; et al

    2015-02-16

    In this letter, we present AlGaN/GaN lateral Schottky barrier diodes on silicon with recessed anodes and dual field plates. A low specific on-resistance RON,SP (5.12 mΩ · cm2), a low turn-on voltage (<0.7 V) and a high reverse breakdown voltage BV (>1.9 kV), were simultaneously achieved in devices with a 25 μm anode/cathode separation, resulting in a power figure-of-merit (FOM) BV2/RON,SP of 727 MW·cm2. The record high breakdown voltage of 1.9 kV is attributed to the dual field plate structure.

  15. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  16. EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana, Hettinger, North Dakota, and New Underwood, South Dakota, in Custer and Fallon Counties in Montana, Adams, Bowman, and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

  17. Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor

    SciTech Connect (OSTI)

    Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

    1982-11-01

    This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

  18. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  19. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  20. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  1. Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack

    SciTech Connect (OSTI)

    Dr. Ram Adapa; Mr. Dante Piccone

    2012-04-30

    ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current

  2. The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation

    SciTech Connect (OSTI)

    Gusev, S. I.; Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I.

    2009-09-15

    The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

  3. OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS

    SciTech Connect (OSTI)

    W.A. REASS; J.D. DOSS; ET AL

    2001-06-01

    This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

  4. Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks

    SciTech Connect (OSTI)

    Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S.

    2006-11-15

    An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

  5. SU-D-207-03: Development of 4D-CBCT Imaging System with Dual Source KV X-Ray Tubes

    SciTech Connect (OSTI)

    Nakamura, M; Ishihara, Y; Matsuo, Y; Ueki, N; Iizuka, Y; Mizowaki, T; Hiraoka, M

    2015-06-15

    Purpose: The purposes of this work are to develop 4D-CBCT imaging system with orthogonal dual source kV X-ray tubes, and to determine the imaging doses from 4D-CBCT scans. Methods: Dual source kV X-ray tubes were used for the 4D-CBCT imaging. The maximum CBCT field of view was 200 mm in diameter and 150 mm in length, and the imaging parameters were 110 kV, 160 mA and 5 ms. The rotational angle was 105°, the rotational speed of the gantry was 1.5°/s, the gantry rotation time was 70 s, and the image acquisition interval was 0.3°. The observed amplitude of infrared marker motion during respiration was used to sort each image into eight respiratory phase bins. The EGSnrc/BEAMnrc and EGSnrc/DOSXYZnrc packages were used to simulate kV X-ray dose distributions of 4D-CBCT imaging. The kV X-ray dose distributions were calculated for 9 lung cancer patients based on the planning CT images with dose calculation grid size of 2.5 x 2.5 x 2.5 mm. The dose covering a 2-cc volume of skin (D2cc), defined as the inner 5 mm of the skin surface with the exception of bone structure, was assessed. Results: A moving object was well identified on 4D-CBCT images in a phantom study. Given a gantry rotational angle of 105° and the configuration of kV X-ray imaging subsystems, both kV X-ray fields overlapped at a part of skin surface. The D2cc for the 4D-CBCT scans was in the range 73.8–105.4 mGy. Linear correlation coefficient between the 1000 minus averaged SSD during CBCT scanning and D2cc was −0.65 (with a slope of −0.17) for the 4D-CBCT scans. Conclusion: We have developed 4D-CBCT imaging system with dual source kV X-ray tubes. The total imaging dose with 4D-CBCT scans was up to 105.4 mGy.

  6. Table 8.12a Electric Noncoincident Peak Load and Capacity Margin: Summer Peak Period, 1986-2011 (Megawatts, Except as Noted)

    U.S. Energy Information Administration (EIA) Indexed Site

    a Electric Noncoincident Peak Load and Capacity Margin: Summer Peak Period, 1986-2011 (Megawatts, Except as Noted) Year Noncoincident Peak Load 1 by North American Electric Reliability Corporation (NERC) 2 Regional Assessment Area Capacity Margin 21 (percent) Eastern Interconnection ERCOT 4 Western Inter- connection All Inter- connections FRCC 5 NPCC 6 Balance of Eastern Region 3 ECAR 7,8 MAAC 8,9 MAIN 8,10 MAPP 11 MISO 12 MRO 13 PJM 14 RFC 8,15 SERC 16 SPP 17 Subtotal TRE 18 WECC 19 Total 20

  7. Word Pro - Untitled1

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Table 8.12b Electric Noncoincident Peak Load and Capacity Margin: Winter Peak Period, 1986-2011 (Megawatts, Except as Noted) Year Noncoincident Peak Load 1 by North American Electric Reliability Corporation (NERC) 2 Regional Assessment Area Capacity Margin 21 (percent) Eastern Interconnection ERCOT 4 Western Inter- connection All Inter- connections FRCC 5 NPCC 6 Balance of Eastern Region 3 ECAR 7,8 MAAC 8,9 MAIN 8,10 MAPP 11 MISO 12 MRO 13 PJM 14 RFC 8,15 SERC 16 SPP 17 Subtotal TRE 18 WECC 19

  8. monthly_peak_2005.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    3a . January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Council Region, 2005 and Projected 2006 through 2010 (Megawatts and 2005 Base Year) Projected Monthly Base Year Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid FRCC MRO NPCC RFC SERC SPP ERCOT WECC Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak

  9. monthly_peak_2006.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Released: February 7, 2008 Next Update: October 2008 Table 3a . January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Corporation Region 2006 and Projected 2007 through 2011 (Megawatts and 2006 Base Year) Projected Monthly Base Year Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid FRCC MRO NPCC RFC SERC SPP ERCOT WECC Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW) Peak

  10. winter_peak_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    b . Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, 1990 through 2004 and Projected 2005 through 2009 (Megawatts and 2004 Base Year) Winter Noncoincident Peak Load Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC MAIN MAPP/MRO (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990/1991 484,231 67,097 30,800 36,551 32,461 21,113 40,545 86,648 38,949 35,815 94,252 1991/1992 485,761

  11. Next Update: November 2013

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    the - - - - - - - - - - 2011 US WIN FRCC FRCC 1e Non-Controllable Demand-Side Demand Response - - - - - - - - - - 2011 US WIN FRCC FRCC 2 Total Internal Demand 40,117 46,864 ...

  12. Form EIA-411 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    2011,"US","SUM","FRCC","FRCC","1e","Non-Controllable Demand-Side Demand Response",,0,0,0,0,,0,0,0,0,0,0 2011,"US","SUM","FRCC","FRCC",2,"Total Internal ...

  13. Form EIA-411 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    2011,"US","WIN","FRCC","FRCC","1e","Non-Controllable Demand-Side Demand Response",,0,0,0,0,,0,0,0,0,0,0 2011,"US","WIN","FRCC","FRCC",2,"Total Internal ...

  14. Experimental investigations of overvoltages in 6kV station service cable networks of thermal power plants

    SciTech Connect (OSTI)

    Vukelja, P.I.; Naumov, R.M.; Drobnjak, G.V.; Mrvic, J.D.

    1996-12-31

    The paper presents the results of experimental investigations of overvoltages on 6kV isolated neutral station service cable networks of thermal power plants. The overvoltages were recorded with capacitive voltage measurement systems made at the Nikola Tesla Institute. Wideband capacitive voltage measurement systems recorded a flat response from below power frequencies to 10MHz. Investigations of overvoltages were performed for appearance and interruption of metal earth faults, intermittent earth faults, switching operation of HV motors switchgear, switching operation of transformers switchgear, and transfer of the network supply from one transformer to another. On the basis of these investigations, certain measures are proposed for limiting overvoltages and for the reliability of station service of thermal power plants.

  15. Type A Accident Investigation Board Report of the April 25, 1997, Contractor Fatality on the Olympia-White River #1 230 kV Line

    Broader source: Energy.gov [DOE]

    On April 25, 1997, at approximately 1510 hours, a lineman for Great Southwestern Construction Inc. was fatally electrocuted when he came in direct contact with a deenergized 230-kilovolt (kV) transmission power line conductor which contained an induced voltage.

  16. Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle

    SciTech Connect (OSTI)

    Kuz'micheva, K. I.; Merzlyakov, A. S.; Fokin, G. G.

    2013-05-15

    The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

  17. Type A Accident Investigation Report on the June 25, 1997, Contractor Inspector Fatality on the Satsop-Aberdeen #2 & #3 230 kV Line

    Broader source: Energy.gov [DOE]

    On June 27, 1997, I established a Type-A Accident Investigation Board to investigate the June 25, 1997 fatal contractor accident which occurred on BPA’s Satsop-Aberdeen #2 and #3 230-kV transmission lines right-of-way.

  18. Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.

    SciTech Connect (OSTI)

    Lee, Jack M.

    1992-06-01

    Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

  19. Development and experience of large conductor cable 35-kV joints at the Los Angeles Department of Water and Power

    SciTech Connect (OSTI)

    Calderon, F.; Findon, E.J. )

    1990-01-01

    The Los Angeles Department of Water and Power (LADWP) places a high priority on developing its distribution system in the most reliable and cost-effective manner. At higher distribution voltages, such as 34.5-kV, jointing systems which are easily, consistently, and quickly installed by both utility and contracted personnel offer significant economic advantages. With increasing loads and higher load densities at LADWP, the use of 34.5-kV, cross-linked polyethylene (CLP) aluminum, 1000-kcmil cable is becoming more common to meet customer load requirements. Two methods of jointing this large conductor cable were historically used, although each method had limitations. This paper provides an overview of LADWP's distribution system, past jointing techniques, the investigation and evaluation of alternate approaches, and the field experience with the joint selected for use.

  20. Level 1 Accident Investigation Report of August 17, 2004, Fatal Aircraft Accident on the Grand Coulee-Bell No.6, 500 kV Line

    Broader source: Energy.gov [DOE]

    On August 17, 2004, at approximately 0940, a Bonneville Power Administration (BPA) pilot was killed in the crash of a Bell 206BIII helicopter while stringing "sock line" to enable the subsequent stringing of new conductors and static wire on the Grand Coulee-Bell #6 500-kV line between tower 84/2 and BPA’s Bell Substation in Mead, Washington. (See Appendix 7, Site Map.)

  1. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  2. Development of 230-kV high-pressure, gas-filled, pipe-type cable system: Model test program phase

    SciTech Connect (OSTI)

    Silver, D.A. )

    1990-09-01

    The objective of this project was the development of a 230 kV high-pressure gas-filled (HPGF) pipe-type cable employing paper or laminate of paper-polypropylene-paper (PPP) insulation pressurized with N{sub 2} gas or a blend of 15% SF{sub 6}/85% N{sub 2} gas. Heretofore, HPGF pipe-type cables have been restricted to 138 kV ratings due to technical difficulties in achieving higher voltage ratings. In view of the high cost of manufacturing and testing a large number of full size cables, cable models with 2 mm (80 mils) and 2.5 mm (100 mils) wall thicknesses of insulation enclosed in a test fixture capable of withstanding a test pressure of 2070 kPa (300 psig) and high electrical stresses were employed for dissipation factor versus voltage measurements and for ac and impulse breakdown tests at rated and emergency operating temperatures. In addition, a 36 cm (14 in) full wall cable model enclosed in a pressure vessel was utilized for transient pressure response tests. The results of this investigation attest tot he technical feasibility of the design and manufacture of a 230 kV HPGF pipe-type cable employing paper or PPP insulation pressurized with 100% N{sub 2} gas or a blend of 15% SF{sub 6}/85% N{sub 2} gas for operation under normal and 100 hour emergency conditions at conductor temperatures of 85{degree} and 105{degree}C, respectively. The manufacture of a full size PPP insulated cable pressurized with a blend of 15% SF{sub 6}/85% N{sub 2} gas employing pre-impregnated PPP insulating tapes and an annular conductor based on the design stresses defined in this report is recommended for laboratory evaluation and extended life tests. 11 refs., 45 figs., 11 tabs.

  3. Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage

    SciTech Connect (OSTI)

    Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

    2011-08-25

    The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

  4. Development of NS-TACSR with extremely suppressed aeolian noise and its application to 500 kV overhead transmission lines

    SciTech Connect (OSTI)

    Tsujimoto, K.; Furukawa, S. (Kansai Electric Power Co., Inc., Osaka (Japan)); Shimojima, K.; Yamamoto, K. (Hitachi Cable, Ltd., Hitachi (JP))

    1991-10-01

    Recently in Japan, with the unprecedented advance of residential area development in the suburbs of large cities, it has become quite difficult to secure the routes of EHV transmission lines from nuclear power plants in remote places to the suburbs of large cities, urging resolution of environmental problems related to transmission lines. In Japan, aerodynamic sound produced by conductors and insulators frequently caused noise problems. Having an opportunity of constructing a 500 kV transmission line through a residential are, we made a research to resolve this noise problem. This paper describes the characteristics of aeolian noise and preventive measures against it.

  5. Property:EIA/861/NercMro | Open Energy Information

    Open Energy Info (EERE)

    + true + Brainerd Public Utilities + true + Brodhead Water & Lighting Comm + true + Brown County Rural Elec Assn + true + Burke-Divide Electric Coop Inc + true + Butler County...

  6. TH-C-18A-10: The Influence of Tube Current On X-Ray Focal Spot Size for 70 KV CT Imaging

    SciTech Connect (OSTI)

    Duan, X; Grimes, J; Yu, L; Leng, S; McCollough, C

    2014-06-15

    Purpose: Focal spot blooming is an increase in the focal spot size at increased tube current and/or decreased tube potential. In this work, we evaluated the influence of tube current on the focal spot size at low kV for two CT systems, one of which used a tube designed to reduce blooming effects. Methods: A slit camera (10 micron slit) was used to measure focal spot size on two CT scanners from the same manufacturer (Siemens Somatom Force and Definition Flash) at 70 kV and low, medium and maximum tube currents, according to the capabilities of each system (Force: 100, 800 and 1300 mA; Flash: 100, 200 and 500 mA). Exposures were made with a stationary tube in service mode using a raised stand without table movement or flying focal spot technique. Focal spot size, nominally 0.8 and 1.2 mm, respectively, was measured parallel and perpendicular to the cathode-anode axis by calculating the full-width-at-half-maximum of the slit profile recording using computed radiographic plates. Results: Focal spot sizes perpendicular to the anode-cathode axis increased at the maximum mA by 5.7% on the Force and 39.1% on the Flash relative to that at the minimal mA, even though the mA was increased 13-fold on the Force and only 5- fold on the Flash. Focal spot size increased parallel to the anode-cathode axis by 70.4% on Force and 40.9% on Flash. Conclusion: For CT protocols using low kV, high mA is typically required. These protocols are relevant in children and smaller adults, and for dual-energy scanning. Technical measures to limit focal spot blooming are important in these settings to avoid reduced spatial resolution. The x-ray tube on a recently-introduced scanner appears to greatly reduce blooming effects, even at very high mA values. CHM has research support from Siemens Healthcare.

  7. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

  8. Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado

    SciTech Connect (OSTI)

    N /A

    2000-03-20

    The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

  9. Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

  10. Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

  11. SU-E-T-548: Modeling of Breast IORT Using the Xoft 50 KV Brachytherapy Source and 316L Steel Rigid Shield

    SciTech Connect (OSTI)

    Burnside, W

    2015-06-15

    Purpose: Xoft provides a set of 316L Stainless Steel Rigid Shields to be used with their 50 kV X-ray source for Breast IORT treatments. Modeling the different shield sizes in MCNP provides information to help make clinical decisions for selecting the appropriate shield size. Methods: The Xoft Axxent 50 kV Electronic Brachytherapy System has several applications in radiation therapy, one of which is treating cancer of the breast intraoperatively by placing the miniaturized X-ray tube inside an applicator balloon that is expanded to fill the lumpectomy bed immediately following tumor removal. The ribs, lung, and muscular chest wall are all regions at risk to receive undesired dose during the treatment. A Xoft 316L Stainless Steel Rigid Shield can be placed between the intracostal muscles of the chest wall and the remaining breast tissue near the balloon to attenuate the beam and protect these organs. These shields are provided in 5 different sizes, and the effects on dose to the surrounding tissues vary with shield size. MCNP was used to model this environment and tally dose rate to certain regions of interest. Results: The average rib dose rate calculated using 0cm (i.e., no shield), 3cm, and 5cm diameter shields were 26.89, 15.43, and 8.91 Gy/hr respectively. The maximum dose rates within the rib reached 94.74 Gy/hr, 53.56 Gy/hr, and 31.44 Gy/hr for the 0cm, 3cm, and 5cm cases respectively. The shadowing effect caused by the steel shields was seen in the 3-D meshes and line profiles. Conclusion: This model predicts a higher dose rate to the underlying rib region with the 3cm shield compared to the 5cm shield; it may be useful to select the largest possible diameter when choosing a shield size for a particular IORT patient. The ability to attenuate the beam to reduce rib dose was also confirmed. Research sponsored by Xoft Inc, a subsidiary of iCAD.

  12. SU-E-J-214: Comparative Assessment On IGRT On Partial Bladder Cancer Treatment Between CT-On-Rails (CTOR) and KV Cone Beam CT (CBCT)

    SciTech Connect (OSTI)

    Lin, T; Ma, C

    2014-06-01

    Purpose: Image-Guided radiation therapy(IGRT) depends on reliable online patient-specific anatomy information to address random and progressive anatomy changes. Large margins have been suggested to bladder cancer treatment due to large daily bladder anatomy variation. KV Cone beam CT(CBCT) has been used in IGRT localization prevalently; however, its lack of soft tissue contrast makes clinicians hesitate to perform daily soft tissue alignment with CBCT for partial bladder cancer treatment. This study compares the localization uncertainties of bladder cancer IGRT using CTon- Rails(CTOR) and CBCT. Methods: Three T2N0M0 bladder cancer patients (total of 66 Gy to partial bladder alone) were localized daily with either CTOR or CBCT for their entire treatment course. A total of 71 sets of CTOR and 22 sets of CBCT images were acquired and registered with original planning CT scans by radiation therapists and approved by radiation oncologists for the daily treatment. CTOR scanning entailed 2mm slice thickness, 0.98mm axial voxel size, 120kVp and 240mAs. CBCT used a half fan pelvis protocol from Varian OBI system with 2mm slice thickness, 0.98axial voxel size, 125kVp, and 680mAs. Daily localization distribution was compared. Accuracy of CTOR and CBCT on partial bladder alignment was also evaluated by comparing bladder PTV coverage. Results: 1cm all around PTV margins were used in every patient except target superior limit margin to 0mm due to bowel constraint. Daily shifts on CTOR averaged to 0.48, 0.24, 0.19 mms(SI,Lat,AP directions); CBCT averaged to 0.43, 0.09, 0.19 mms(SI,Lat,AP directions). The CTOR daily localization showed superior results of V100% of PTV(102% CTOR vs. 89% CBCT) and bowel(Dmax 69.5Gy vs. 78Gy CBCT). CTOR images showed much higher contrast on bladder PTV alignment. Conclusion: CTOR daily localization for IGRT is more dosimetrically beneficial for partial bladder cancer treatment than kV CBCT localization and provided better soft tissue PTV

  13. Operation of Lanzhou all permanent electron cyclotron resonance ion source No. 2 on 320 kV platform with highly charged ions

    SciTech Connect (OSTI)

    Lu, W.; Li, J. Y.; Kang, L.; Liu, H. P.; Li, H.; Li, J. D.; Sun, L. T.; Ma, X. W.

    2014-02-15

    The 320 kV platform for multi-discipline research with highly charged ions is a heavy ion beam acceleration instrument developed by Institute of Modern Physics, which is dedicated to basic scientific researches such as plasma, atom, material physics, and astrophysics, etc. The platform has delivered ion beams of 400 species for 36?000 h. The average operation time is around 5000 h/year. With the beams provided by the platform, lots of outstanding progresses were made in various research fields. The ion source of the platform is an all-permanent magnet electron cyclotron resonance ion source, LAPECR2 (Lanzhou All Permanent ECR ion source No. 2). The maximum axial magnetic fields are 1.28 T at injection and 1.07 T at extraction, and the radial magnetic field is up to 1.21 T at the inner wall of the plasma chamber. The ion source is capable to produce low, medium, and high charge state gaseous and metallic ion beams, such as H{sup +}, {sup 40}Ar{sup 8+}, {sup 129}Xe{sup 30+}, {sup 209}Bi{sup 33+}, etc. This paper will present the latest result of LAPECR2 and the routine operation status for the high voltage platform.

  14. Impact Mitigation and Monitoring of the BPA 500-kV Garrison-Taft Transmission Line : Effects on Elk Security and Hunter Opportunity, Final Report.

    SciTech Connect (OSTI)

    Canfield, Jodie E.

    1988-11-01

    This study was conducted by the Montana Department of Fish, Wildlife and Parks from 1984--1988 to assess the impacts of the Garrison-Taft segment of a 500-kV powerline on elk summer-fall habitat. Construction of the powerline began in 1983, and the powerline was energized in 1985. The Garrison-Taft powerline corridor crossed 251 km of mountainous terrain in western Montana; about 465 km of new roads were constructed to provide permanent access to the powerline towers. The objectives of the study were: (1) to monitor the effectiveness of mitigation measures, including timing restrictions on construction activities and road closures on newly-built access roads, and (2) to determine if opening previously-unroaded elk security habitats to hunters by powerline access roads affected elk habitat use, distribution, use of security areas, or elk harvest. In addition, both the potential for accelerated timber harvest in areas crossed by the powerline that would not have otherwise been logged because of marginal economics and lack of haul roads and the potential effect of powerline flashovers on future prescribed burning of elk winter-ranges were evaluated. 83 refs., 88 figs., 15 tabs.

  15. Atomic and electronic structures of SrTiO3/GaAs heterointerfaces: An 80-kV atomic-resolution electron energy-loss spectroscopy study

    SciTech Connect (OSTI)

    Qiao, Q.; Klie, Robert F; Ogut, Serdar; Idrobo Tapia, Juan C

    2012-01-01

    We have examined the atomic and electronic structures of epitaxially grown, ultrathin SrTiO{sub 3} (100) films on GaAs (001) using 80-kV aberration-corrected atomic-resolution Z-contrast imaging and electron energy-loss spectroscopy (EELS) to develop a fundamental understanding of the interfacial structure-property relationships. We find that the interface is atomically abrupt and no surface reconstruction of the GaAs (001) surface is observed. Using atomic-column resolved EELS, we examine the oxygen vacancy and Ti concentrations in the SrTiO{sub 3} film and across the heterointerface. We show that Ti diffuses into the first few monolayers of GaAs. Using a combination of EELS and first-principles calculations, we present evidence for the formation of As oxides at the interface depending on the thin-film growth conditions. These findings are used to explain the differences in the transport behavior of the films.

  16. Next Update: October 2009

    U.S. Energy Information Administration (EIA) Indexed Site

    b . Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, 2007 and Projected 2008 through 2012 (Megawatts and 2007 Base Year) 2007/2008 637,905 41,701 33,191 46,795 141,900 179,888 31,322 50,408 112,700 Contiguous U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP TRE (ERCOT) WECC (U.S.) 656,989 49,601 34,100 48,323 147,100 182,055 31,954 47,270 116,586 669,111 50,463 35,085 48,911 149,100 185,850 32,585 48,285 118,832 680,673 51,606 36,298

  17. Next Update: October 2010

    U.S. Energy Information Administration (EIA) Indexed Site

    Table 2b . Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, 2008 and Projected 2009 through 2013 (Megawatts and 2008 Base Year) 2008/2009 643,557 45,275 36,029 46,043 142,395 179,596 32,809 47,806 113,605 Contiguous U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP TRE WECC (U.S.) 642,383 44,446 36,571 47,098 145,800 181,045 32,636 43,463 111,324 651,534 45,099 36,884 47,076 148,000 183,608 33,308 44,463 113,096 664,867 46,140 37,613

  18. net_energy_load_1990_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    Not applicable for this table format Table 1a . Historical Net Energy For Load, Actual by North American Electric Reliability Council Region, 1990 through 2004. (Thousands of Megawatthours) Net Energy For Load (Annual) Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Year ECAR FRCC MAAC MAIN MAPP/MRO (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990 2,886,496 442,507 142,502 221,099 197,326 127,102 250,681 485,205 252,037 209,789 558,248 1991 2,941,669 450,586 146,903

  19. net_energy_load_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    4 and Projected 2005 through 2009 (Thousands of Megawatthours and 2004 Base Year) Net Energy For Load (Annual) Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC MAIN MAPP/MRO (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990 2,886,496 442,507 142,502 221,099 197,326 127,102 250,681 485,205 252,037 209,789 558,248 1991 2,941,669 450,586 146,903 228,588 205,880 129,826 253,701 501,794 257,434 211,568 555,389 1992 2,942,910 450,853

  20. summer_peak_1990_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    c . Historical Noncoincident Summer Peak Load, Actual by North American Electric Reliability Council Region, 1990 through 2004 (Megawatts) Summer Noncoincident Peak Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Year ECAR FRCC MAAC MAIN MAPP/MRO (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990 546,331 79,258 27,266 42,613 40,740 24,994 44,116 94,677 52,541 42,737 97,389 1991 551,418 81,224 28,818 45,937 41,598 25,498 46,594 95,968 51,885 41,870 92,026 1992 548,707

  1. winter_peak_1990_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    d . Historical Noncoincident Winter Peak Load, Actual by North American Electric Reliability Council Region, 1990 through 2004 (Megawatts) Winter Noncoincident Peak Load Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Year ECAR FRCC MAAC MAIN MAPP/MRO (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990/1991 484,231 67,097 30,800 36,551 32,461 21,113 40,545 86,648 38,949 35,815 94,252 1991/1992 485,761 71,181 31,153 37,983 33,420 21,432 41,866 88,422 38,759 35,448 86,097

  2. Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution

    Buildings Energy Data Book [EERE]

    9 2009 Peak Load and Capacity Margin, Summer and Winter by NERC Region (MW) NERC Region Capacity Margin Capacity Margin TRE 16.7% 19.1% FRCC 6.0% 2.0% MRO (U.S.) 24.6% 26.8% NPCC (U.S.) 29.1% 43.2% RFC 25.2% 33.3% SERC 24.6% 26.2% SPP 16.4% 34.6% WECC 19.4% 29.6% U.S. TOTAL 22.2% 28.5% Note(s): Source(s): 128,245 109,565 725,958 668,818 1) Summer Demand includes the months of June, July, August, and September. 2) Winter Demand includes December of the previous year and January-March of the

  3. 2.3-MW Medium-Voltage, Three-Level Wind Energy Inverter Applying a Unique Bus Structure and 4.5-kV Si/SiC Hybrid Isolated Power Modules: Preprint

    SciTech Connect (OSTI)

    Erdman, W.; Keller, J.; Grider, D.; VanBrunt, E.

    2014-11-01

    A high-efficiency, 2.3-MW, medium-voltage, three-level inverter utilizing 4.5-kV Si/SiC (silicon carbide) hybrid modules for wind energy applications is discussed. The inverter addresses recent trends in siting the inverter within the base of multimegawatt turbine towers. A simplified split, three-layer laminated bus structure that maintains low parasitic inductances is introduced along with a low-voltage, high-current test method for determining these inductances. Feed-thru bushings, edge fill methods, and other design features of the laminated bus structure provide voltage isolation that is consistent with the 10.4-kV module isolation levels. Inverter efficiency improvement is a result of the (essential) elimination of the reverse recovery charge present in 4.5-kV Si PIN diodes, which can produce a significant reduction in diode turn-off losses as well as insulated-gate bipolar transistor (IGBT) turn-on losses. The hybrid modules are supplied in industry-standard 140 mm x 130 mm and 190 mm x 130 mm packages to demonstrate direct module substitution into existing inverter designs. A focus on laminated bus/capacitor-bank/module subassembly level switching performance is presented.

  4. SU-E-I-07: Response Characteristics and Signal Conversion Modeling of KV Flat-Panel Detector in Cone Beam CT System

    SciTech Connect (OSTI)

    Wang, Yu; Cao, Ruifen; Pei, Xi; Wang, Hui; Hu, Liqin

    2015-06-15

    Purpose: The flat-panel detector response characteristics are investigated to optimize the scanning parameter considering the image quality and less radiation dose. The signal conversion model is also established to predict the tumor shape and physical thickness changes. Methods: With the ELEKTA XVI system, the planar images of 10cm water phantom were obtained under different image acquisition conditions, including tube voltage, electric current, exposure time and frames. The averaged responses of square area in center were analyzed using Origin8.0. The response characteristics for each scanning parameter were depicted by different fitting types. The transmission measured for 10cm water was compared to Monte Carlo simulation. Using the quadratic calibration method, a series of variable-thickness water phantoms images were acquired to derive the signal conversion model. A 20cm wedge water phantom with 2cm step thickness was used to verify the model. At last, the stability and reproducibility of the model were explored during a four week period. Results: The gray values of image center all decreased with the increase of different image acquisition parameter presets. The fitting types adopted were linear fitting, quadratic polynomial fitting, Gauss fitting and logarithmic fitting with the fitting R-Square 0.992, 0.995, 0.997 and 0.996 respectively. For 10cm water phantom, the transmission measured showed better uniformity than Monte Carlo simulation. The wedge phantom experiment show that the radiological thickness changes prediction error was in the range of (-4mm, 5mm). The signal conversion model remained consistent over a period of four weeks. Conclusion: The flat-panel response decrease with the increase of different scanning parameters. The preferred scanning parameter combination was 100kV, 10mA, 10ms, 15frames. It is suggested that the signal conversion model could effectively be used for tumor shape change and radiological thickness prediction. Supported by

  5. SU-E-J-89: Comparative Analysis of MIM and Velocity’s Image Deformation Algorithm Using Simulated KV-CBCT Images for Quality Assurance

    SciTech Connect (OSTI)

    Cline, K; Narayanasamy, G; Obediat, M; Stanley, D; Stathakis, S; Kirby, N; Kim, H

    2015-06-15

    Purpose: Deformable image registration (DIR) is used routinely in the clinic without a formalized quality assurance (QA) process. Using simulated deformations to digitally deform images in a known way and comparing to DIR algorithm predictions is a powerful technique for DIR QA. This technique must also simulate realistic image noise and artifacts, especially between modalities. This study developed an algorithm to create simulated daily kV cone-beam computed-tomography (CBCT) images from CT images for DIR QA between these modalities. Methods: A Catphan and physical head-and-neck phantom, with known deformations, were used. CT and kV-CBCT images of the Catphan were utilized to characterize the changes in Hounsfield units, noise, and image cupping that occur between these imaging modalities. The algorithm then imprinted these changes onto a CT image of the deformed head-and-neck phantom, thereby creating a simulated-CBCT image. CT and kV-CBCT images of the undeformed and deformed head-and-neck phantom were also acquired. The Velocity and MIM DIR algorithms were applied between the undeformed CT image and each of the deformed CT, CBCT, and simulated-CBCT images to obtain predicted deformations. The error between the known and predicted deformations was used as a metric to evaluate the quality of the simulated-CBCT image. Ideally, the simulated-CBCT image registration would produce the same accuracy as the deformed CBCT image registration. Results: For Velocity, the mean error was 1.4 mm for the CT-CT registration, 1.7 mm for the CT-CBCT registration, and 1.4 mm for the CT-simulated-CBCT registration. These same numbers were 1.5, 4.5, and 5.9 mm, respectively, for MIM. Conclusion: All cases produced similar accuracy for Velocity. MIM produced similar values of accuracy for CT-CT registration, but was not as accurate for CT-CBCT registrations. The MIM simulated-CBCT registration followed this same trend, but overestimated MIM DIR errors relative to the CT

  6. Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  7. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  8. SU-E-J-13: Six Degree of Freedom Image Fusion Accuracy for Cranial Target Localization On the Varian Edge Stereotactic Radiosurgery System: Comparison Between 2D/3D and KV CBCT Image Registration

    SciTech Connect (OSTI)

    Xu, H; Song, K; Chetty, I; Kim, J; Wen, N

    2015-06-15

    Purpose: To determine the 6 degree of freedom systematic deviations between 2D/3D and CBCT image registration with various imaging setups and fusion algorithms on the Varian Edge Linac. Methods: An anthropomorphic head phantom with radio opaque targets embedded was scanned with CT slice thicknesses of 0.8, 1, 2, and 3mm. The 6 DOF systematic errors were assessed by comparing 2D/3D (kV/MV with CT) with 3D/3D (CBCT with CT) image registrations with different offset positions, similarity measures, image filters, and CBCT slice thicknesses (1 and 2 mm). The 2D/3D registration accuracy of 51 fractions for 26 cranial SRS patients was also evaluated by analyzing 2D/3D pre-treatment verification taken after 3D/3D image registrations. Results: The systematic deviations of 2D/3D image registration using kV- kV, MV-kV and MV-MV image pairs were within ±0.3mm and ±0.3° for translations and rotations with 95% confidence interval (CI) for a reference CT with 0.8 mm slice thickness. No significant difference (P>0.05) on target localization was observed between 0.8mm, 1mm, and 2mm CT slice thicknesses with CBCT slice thicknesses of 1mm and 2mm. With 3mm CT slice thickness, both 2D/3D and 3D/3D registrations performed less accurately in longitudinal direction than thinner CT slice thickness (0.60±0.12mm and 0.63±0.07mm off, respectively). Using content filter and using similarity measure of pattern intensity instead of mutual information, improved the 2D/3D registration accuracy significantly (P=0.02 and P=0.01, respectively). For the patient study, means and standard deviations of residual errors were 0.09±0.32mm, −0.22±0.51mm and −0.07±0.32mm in VRT, LNG and LAT directions, respectively, and 0.12°±0.46°, −0.12°±0.39° and 0.06°±0.28° in RTN, PITCH, and ROLL directions, respectively. 95% CI of translational and rotational deviations were comparable to those in phantom study. Conclusion: 2D/3D image registration provided on the Varian Edge radiosurgery, 6 DOF

  9. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect (OSTI)

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  10. PRESS HARD YOU ARE MAKING MULTIPLE COPIES B. MRO Name, Address...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STEP 5A: PRIMARY SPECIMEN REPORT - COMPLETED BY TEST FACILITY NEGATIVE POSITIVE for: Marijuana Metabolite (9-THCA) 6- Acetylmorphine Methamphetamine MDMA REJECTED FOR TESTING ...

  11. Tampa Electric Co | Open Energy Information

    Open Energy Info (EERE)

    for 2010 - File1a1 Energy Information Administration Form 8262 3 4 EIA Form 861 Data Utility Id 18454 Utility Location Yes Ownership I NERC Location FRCC NERC FRCC Yes...

  12. winter_schedule3_2010.xls

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    meter ge - - - - - - - - - - 2010 US WIN FRCC - 1e Non-Controllable Demand-Side Demand Response - - - - - - - - - - 2010 US WIN FRCC - 2 Total Internal Demand 46,135 47,613 ...

  13. summer_schedule3_2010.xls

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    meter ge - - - - - - - - - - 2010 US SUM FRCC - 1e Non-Controllable Demand-Side Demand Response - - - - - - - - - - 2010 US SUM FRCC - 2 Total Internal Demand 45,722 46,091 ...

  14. Worksheet

    U.S. Energy Information Administration (EIA) Indexed Site

    ,2010,"US","WIN","FRCC","-","1e","Non-Controllable Demand-Side Demand Response",,0,0,0,0,0,0,0,0,0,0 ,2010,"US","WIN","FRCC","-",2,"Total Internal ...

  15. Worksheet

    U.S. Energy Information Administration (EIA) Indexed Site

    ,2010,"US","SUM","FRCC","-","1e","Non-Controllable Demand-Side Demand Response",,0,0,0,0,0,0,0,0,0,0 ,2010,"US","SUM","FRCC","-",2,"Total Internal ...

  16. VISAR2KV1.0Beta

    Energy Science and Technology Software Center (OSTI)

    2001-01-01

    The software provides a rapid and robust method for reducing fringe records obtained using eithe a line-imaging optically recording velocity interferometry system (ORVIS) or stop-motion imaging of the moving fringe field. The reduced records result in spatially resolved velocity profiles of rapidly accelerating objects. Complex, time-dependent fringe motion (corresponding to local velocity variations) can be evaluated and interpreted using this program.

  17. Analysis of the Clean Energy Standard Act of 2012

    Gasoline and Diesel Fuel Update (EIA)

    4 Appendix C: Map of NEMS Electricity Market Module Regions 1 Texas Regional Entity (ERCT) 12 SERC Delta (SRDA) 2 Florida Reliability Coordinating Council (FRCC) 13 SERC ...

  18. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    generator stator windings are over 50 years old, three of the twelve in the family have failed in service, and the typical life of a winding is approximately 35 years. Of the 10...

  19. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ring. When complete, all substations and VHF sites in Oregon will be connected to the digital communications backbone, except as noted below. Analog circuits that terminate or...

  20. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JC Microwave Upgrade This project will complete the digital conversion for the upper part of the JC communications ring. This will involve the installation of seven radio hops...

  1. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement This project will upgrade the 14 governors in the McNary powerhouse with digital controls along with replacement of associated components. Governor upgrades are a...

  2. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Runner Replacements This project will refurbish the turbines and replace the turbine runners on units 1 - 16 at Chief Joseph. The drivers for this project are reliability and...

  3. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tri Cities Maintenance Headquarters This project will construct a new Tri-Cities maintenance headquarters. BPA field operations in Tri-Cities District currently occupy space in a...

  4. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Palisades Turbine Rehabilitation and Runner Replacement This project will rehabilitate the turbines and replace the turbine runners on the four units at the Palisades powerhouse....

  5. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    includes four separate capital investments at the Grand Coulee Third Power Plant (TPP): * Stator core and winding replacement on units G19 and G20 * Refurbishment of six...

  6. North Steens 230kV Transmission | Open Energy Information

    Open Energy Info (EERE)

    cut with a chainsaw. Herbaceous plants and low-growing shrubs will be left in place. All ESC measures will be in place and functioning before any construction activities occur....

  7. net_energy_load_2006.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    Area Power Pool (MAPP) to Midwest Reliability Organization (MRO). * The MRO, SERC, and SPP regional boundaries were altered as utilities changed reliability organizations. ...

  8. summer_peak_2005.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    Area Power Pool (MAPP) to Midwest Reliability Organization (MRO). * The MRO, SERC, and SPP regional boundaries were altered as utilities changed reliability organizations. ...

  9. ,"Table 1. Net Energy For Load, Actual and Projected by North...

    U.S. Energy Information Administration (EIA) Indexed Site

    Area Power Pool (MAPP) to Midwest Reliability Organization (MRO)." ," * The MRO, SERC, and SPP regional boundaries were altered as utilities changed reliability organizations. ...

  10. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    Area Power Pool (MAPP) to Midwest Reliability Organization (MRO)." ," * The MRO, SERC, and SPP regional boundaries were altered as utilities changed reliability organizations. ...

  11. net_energy_load_2005.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    Area Power Pool (MAPP) to Midwest Reliability Organization (MRO). * The MRO, SERC, and SPP regional boundaries were altered as utilities changed reliability organizations. ...

  12. RAPID/BulkTransmission/Montana | Open Energy Information

    Open Energy Info (EERE)

    Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's...

  13. City of Nebraska City, Nebraska (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 13334 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying...

  14. Nebraska Public Power District | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 13337 Utility Location Yes Ownership P NERC Location MRO NERC MRO Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  15. Form EIA-411 for 2006",,"WINTER

    U.S. Energy Information Administration (EIA) Indexed Site

    WINTER" ,"Released: February 7, 2008" ,"Next Update: October 2008" "Table 5j. Winter (FRCC) Historical and Projected Demand and Capacity, Calendar Year 2006 " "Region","FRCC" "Subregion", "Country","U" ,"WINTER",,"Actual","Projected"

  16. summer_peak_2004.xls

    Gasoline and Diesel Fuel Update (EIA)

    2009 (Megawatts and 2004 Base Year) Summer Noncoincident Peak Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC...

  17. summer_peak_2003.xls

    Gasoline and Diesel Fuel Update (EIA)

    2008 (Megawatts and 2003 Base Year) Summer Noncoincident Peak Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC...

  18. Southeastern Power Admin | Open Energy Information

    Open Energy Info (EERE)

    Location SERC NERC FRCC Yes NERC SERC Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility...

  19. Form EIA-411 for 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    B.1. FRCC monthly peak hour demand, by North American Electric Reliability Corporation Assesment Area," "1996-2011 actual, 2012-2013 projected" "megawatts" "FRCC","Year","January","February","March","April","May","June","July","August","September","October","November","December"

  20. Released: April 2016

    U.S. Energy Information Administration (EIA) Indexed Site

    B.1. FRCC monthly peak hour demand, by North American Electric Reliability Corporation Assesment Area," "1996-2014 actual, 2015-2016 projected" "megawatts" "FRCC","Year","January","February","March","April","May","June","July","August","September","October","November","December"

  1. Verendrye Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    - File1a1 Energy Information Administration Form 8262 EIA Form 861 Data Utility Id 19790 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Distribution...

  2. Village of Mullen, Nebraska (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    - File1a1 EIA Form 861 Data Utility Id 13090 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity...

  3. Rushmore Electric Pwr Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    MRO NERC MRO Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility...

  4. South Central Public Pwr Dist | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 17548 Utility Location Yes Ownership P NERC Location MRO NERC MRO Yes RTO SPP Yes Activity Distribution Yes Activity Retail Marketing Yes This article is a stub....

  5. City of Hastings, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 8245 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

  6. Basin Electric Power Coop | Open Energy Information

    Open Energy Info (EERE)

    Location Yes Ownership C NERC Location WECC&MRO NERC MRO Yes NERC SPP Yes NERC WECC Yes RTO SPP Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity...

  7. City of Crete, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Id 4527 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes NERC SPP Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  8. North Central Public Pwr Dist | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 13698 Utility Location Yes Ownership P NERC Location MRO NERC MRO Yes RTO SPP Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  9. Consumers Energy | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 11788 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes This...

  10. Materials Data on K(V5S8)2 (SG:13) by Materials Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Kristin Persson

    2015-01-21

    Computed materials data using density functional theory calculations. These calculations determine the electronic structure of bulk materials by solving approximations to the Schrodinger equation. For more information, see https://materialsproject.org/docs/calculations

  11. EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV...

    Broader source: Energy.gov (indexed) [DOE]

    the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to...

  12. EIS-0301: NRG Energy Services, Inc., Arizona-Baja California 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to approve NRG Energy, Inc. (NRG) for a Presidential permit to construct a 500,000-volt transmission line originating at the switchyard of the Palo Verde Nuclear Generating Station near Phoenix, Arizona, and extending approximately 177 miles to the southwest, where it would cross the United States (U.S.) border with Mexico in the vicinity of Calexico, California.

  13. EIS-0091: Garrison-Spokane 500-kV Transmission Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

  14. EIS-0129: New England/Hydro-Quebec 450 kV Transmission Line Interconnection- Phase II

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration issued this EIS to explore the impacts of amending Presidential Permit PP-76 to allow the Vermont Electrical Company to operate at power levels above those stipulated in the permit and to build additional transmission facilities to distribute the increased power. Phase I of this project is detailed in EIS-0103.

  15. EIS-0399: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line

    Broader source: Energy.gov [DOE]

    DOE, jointly with the Montana Department of Environmental Quality (MDEQ), prepared an EIS that evaluated the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana.

  16. EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line

    Broader source: Energy.gov [DOE]

    DOE started to prepare, jointly with the Montana Department of Environmental Quality (MDEQ), an EA that would also serve as a state EIS. The document would evaluate the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana. Based on comments received on the DOE Draft EA/MDEQ Draft EIS, DOE cancelled preparation of the EA and announced preparation of DOE/EIS-0399 (of the same title).

  17. International 345 kV transmission line to Highgate, Vermont: environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The action under consideration is the issuance of a Presidential permit to the Vermont Electric Power Company, Inc. (VELCO) for the construction, operation, maintenance and connection of a facility that will cross the United States-Canada border for international transmission of electric energy. The proposed transmission facilities will consist of a 7.5 mile, alternating current (ac) transmission line and a 200 MW back-to-back direct current (dc) converter terminal station. None of the facilities will involve any polluting emissions. The construction and maintenance of the proposed converter terminal station and transmission facilities will have little or no impact on the geologic features of the region. The transmission line will have little or no effect on agricultural land. Impacts on commercial forestry in the area will be minimal. The proposed route will require clearing about 36 acres of forest. The proposed transmission line and converter terminal site will have no effect on recreational activities, mining activites, residential, commercial, or industrial land use. The proposed corridor will have a minimal impact on area terrestrial wildlife and plant communities. The proposed project will have little or no impact on future population distribution, the operation of local services, employment and economic benefit, or housing in either Franklin or Highgate. 16 references, 3 figures. (ACR)

  18. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this ...

  19. EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

  20. EIS-0078: Jonesboro-Hergett 161-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

  1. EIS-0100: Liberty-Coolidge 230-kV Transmission Line, Arizona

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with an upgrade of electrical transmission capability between the Liberty and Coolidge Substations.

  2. Big Eddy-Knight 500 kV line nears completion with Columbia River...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mile of line. In the crossing, there are just three towers for 1.2 miles of line with the actual river crossing spanning nine-tenths of a mile. The Oregon suspension tower stands...

  3. Cameron to Milford-138kV Transmission Line | Open Energy Information

    Open Energy Info (EERE)

    Not Indicated) for this property. proposed General Provisions: No firearms, air guns, or archery equipment would be allowed on the project sites to prevent shooting of any...

  4. Materials Data on KV4O8 (SG:87) by Materials Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Kristin Persson

    2014-11-02

    Computed materials data using density functional theory calculations. These calculations determine the electronic structure of bulk materials by solving approximations to the Schrodinger equation. For more information, see https://materialsproject.org/docs/calculations

  5. Prototype Development Progress Toward a 500 kV Solid State Marx Modulator

    SciTech Connect (OSTI)

    Leyh, G.

    2004-07-27

    Recent advances in IGBT and SiC technology have made possible a range of solid-state modulator concepts that were unthinkable a decade ago. Power densities and speeds of pulsed-power circuits have increased dramatically due to the commercial introduction of fast, multi-kilovolt IGBT silicon and SiC diodes featured in PCB-style packages. A solid-state modulator concept that stands to benefit considerably from recent IGBT and SiC breakthroughs is the Marx configuration--where an array of stacked modules generates high-voltage output pulses directly from a low voltage DC supply. The Marx scheme avoids the large, inefficient and costly magnetic cores inherent in standard modulator designs, resulting in a considerably simpler, cheaper and more compact mechanical solution. The main disadvantage to this approach is that the individual cells in a Marx bank must float at high voltages during the pulse, complicating the distribution of power and timing signals. This paper examines in closer detail the practical advantages and pitfalls of a solid-state Marx configuration, and explores a design approach with emphasis on performance, wall-plug efficiency, cost of manufacture, availability and ease of service. The paper presents electrical diagrams, mechanical CAD layout and preliminary prototype test data.

  6. Notification of Planned 230kV Outage at Potomac River Generating Station

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01. The next planned outage on xxxxx high voltage circuit between xxxxx and xxxxx is tentatively scheduled for Saturday May 19, 2007 and will begin at 4:00 AM with a scheduled...

  7. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. ...

  8. Characterization of the CEBAF 100 kV DC GaAs Photoelectron Gun Vacuum System

    SciTech Connect (OSTI)

    M.L. Stutzman; P. Adderley; J. Brittian; J. Clark; J. Grames; J. Hansknecht; G.R. Myneni; M. Poelker

    2007-05-01

    A vacuum system with pressure in the low ultra-high vacuum (UHV) range is essential for long photocathode lifetimes in DC high voltage GaAs photoguns. A discrepancy between predicted and measured base pressure in the CEBAF photoguns motivated this study of outgassing rates of three 304 stainless steel chambers with different pretreatments and pump speed measurements of non-evaporable getter (NEG) pumps. Outgassing rates were measured using two independent techniques. Lower outgassing rates were achieved by electropolishing and vacuum firing the chamber. The second part of the paper describes NEG pump speed measurements as a function of pressure through the lower part of the UHV range. Measured NEG pump speed is high at pressures above 510^?11 Torr, but may decrease at lower pressures depending on the interpretation of the data. The final section investigates the pump speed of a locally produced NEG coating applied to the vacuum chamber walls. These studies represent the first detailed vacuum measurements of CEBAF photogun vacuum chambers.

  9. EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

  10. EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance, and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability. Phase 2 of this project is detailed in EIS-0129.

  11. KvH Projekt GmbH Co KG | Open Energy Information

    Open Energy Info (EERE)

    Zip: D-20259 Sector: Biomass, Solar, Wind energy Product: Project developer in wind, solar, biomass and smart architecture. Coordinates: 53.553345, 9.992455 Show Map Loading...

  12. EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

  13. Waddington, NY Natural Gas Exports to Canada

    Gasoline and Diesel Fuel Update (EIA)

    WINTER Table 5j . Winter (FRCC) Historical and Projected Demand and Capacity, Calendar Year 2007 Region FRCC Subregion Country U WINTER Actual Line# DESCRIPTION 2007/2008 2008/2009 2009/2010 2010/2011 1 Unrestricted Non-coincident Peak Demand (Starting Point) = 2+1a+1b-1c-1d 41,701 49,601 50,463 51,606 1a New Conservation (Energy Efficiency) - - - 1b Estimated Diversity - - - - 1c Additions for non-member load (load served by non-registered LSE's in a region) - - - - 1d Stand-by Load Under

  14. Form EIA-411 for 2006",,"SUMMER

    U.S. Energy Information Administration (EIA) Indexed Site

    SUMMER" ,"Released: February 7, 2008" ,"Next Update: October 2008" "Table 5a. Summer (FRCC) Historical and Projected Demand and Capacity, Calendar Year 2006 " "(Megawatts)" "Region","FRCC" "Subregion", "Country","U"," " ,"SUMMER",,"Actual","Projected" "Line#",,"DESCRIPTION",2006,2007,2008,2009,2010,2011,2012,2013,2014,2015,2016

  15. New Switches for Utility-Scale Inverters: First In-Class Demonstration of a Completely New Type of SiC Bipolar Switch (15kV-20kV) for Utility-Scale Inverters

    SciTech Connect (OSTI)

    2011-12-31

    Solar ADEPT Project: The SiCLAB is developing a new power switch for utility-scale PV inverters that would improve the performance and significantly reduce the size, weight, and energy loss of PV systems. A power switch controls the electrical energy flowing through an inverter, which takes the electrical current from a PV solar panel and converts it into the type and amount of electricity that is compatible with the electric grid. SiCLAB is using silicon carbide (SiC) semiconductors in its new power switches, which are more efficient than the silicon semiconductors used to conduct electricity in most conventional power switches today. Switches with SiC semiconductors can operate at much higher temperatures, as well as higher voltage and power levels than silicon switches. SiC-based power switches are also smaller than those made with silicon alone, so they result in much smaller and lighter electrical devices. In addition to their use in utility-scale PV inverters, SiCLABs new power switches can also be used in wind turbines, railways, and other smart grid applications.

  16. EIS-0079: 300-kV International Submarine Transmission Line- Erie, Pennsylvania to Nanticoke, Ontario, Canada General Public Utilities Corporation

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy Office of Energy Emergency Operations developed this statement to assess the potential environmental and socioeconomic impacts of the construction and operation of 44 miles of cable between the Erie West Substation and the Canadian border.

  17. ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... name has changed from Mid-Continent Area Power Pool (MAPP) to Midwest Reliability Organization (MRO)." ," * ReliabilityFirst Corporation (RFC) came into existence on January 1, ...

  18. Village of Hampton, Nebraska (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    M NERC Location MRO Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes This article is a stub. You can help...

  19. Village of Spalding, Nebraska (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Data Utility Id 17727 Utility Location Yes Ownership M NERC Location MRO NERC SPP Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  20. City of Wisner, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 20880 Utility Location Yes Ownership M NERC Location MRO NERC SPP Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes...

  1. City of Franklin, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    861 Data Utility Id 6723 Utility Location Yes Ownership M NERC Location MRO NERC SPP Yes RTO SPP Yes Operates Generating Plant Yes Activity Distribution Yes Activity Bundled...

  2. Next Update: November 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    Next Update: November 2013 Table 3B.1. FRCC monthly peak hour demand, by North American Electric Reliability Corporation Assesment Area, 1996-2011 actual, 2012-2013 projected megawatts FRCC Year January February March April May June July August September October November December 1996 39,860 41,896 32,781 28,609 32,059 33,886 35,444 34,341 34,797 30,037 29,033 34,191 1997 37,127 28,144 27,998 28,458 33,859 34,125 35,356 35,375 33,620 31,798 27,669 31,189 1998 27,122 28,116 29,032 28,008 32,879

  3. monthly_peak_byarea_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    B.1. FRCC Monthly Peak Hour Demand, by North American Electric Reliability Corporation Assesment Area, 1996-2010 Actual, 2011-2012 Projected (Megawatts) FRCC Year January February March April May June July August September October November December 1996 39,860 41,896 32,781 28,609 32,059 33,886 35,444 34,341 34,797 30,037 29,033 34,191 1997 37,127 28,144 27,998 28,458 33,859 34,125 35,356 35,375 33,620 31,798 27,669 31,189 1998 27,122 28,116 29,032 28,008 32,879 37,153 36,576 38,730 34,650

  4. Next Update: November 2016

    U.S. Energy Information Administration (EIA) Indexed Site

    3B.1. FRCC monthly peak hour demand, by North American Electric Reliability Corporation Assesment Area, 1996-2014 actual, 2015-2016 projected megawatts FRCC Year January February March April May June July August September October November December 1996 39,860 41,896 32,781 28,609 32,059 33,886 35,444 34,341 34,797 30,037 29,033 34,191 1997 37,127 28,144 27,998 28,458 33,859 34,125 35,356 35,375 33,620 31,798 27,669 31,189 1998 27,122 28,116 29,032 28,008 32,879 37,153 36,576 38,730 34,650 33,066

  5. summer_nid_cr_cm_1990_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    u Form EIA-411 for 2006 Released: February 7, 2008 Next Update: Not applicable for this table format Table 4a . Summer Historic Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Council Region, 1990 thro (Megawatts and Percent) Year Summer Contiguous U.S. ECAR FRCC MAAC Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW)

  6. summer_nid_cr_cm_2003.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    t Form EIA-411 for 2005 Released: February 7, 2008 Next Update: October 2007 Table 4. Summer Historic and Projected Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Council Region, 1990 (Megawatts and Percent) Projected Year Base Year Summer Contiguous U.S. ECAR FRCC MAAC Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW)

  7. summer_nid_cr_cm_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    Form EIA-411 for 2005 Released: February 7, 2008 Next Update: October 2007 Table 4. Summer Historic and Projected Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Council Regio (Megawatts and Percent) Projected Year Base Year Summer Contiguous U.S. ECAR FRCC MAAC Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity Resources (MW) Capacity Margin (percent) Net Internal Demand (MW) Capacity

  8. Slide 1

    U.S. Energy Information Administration (EIA) Indexed Site

    11 10 19 22 21 20 15 14 9 13 5 5 6 1 2 3 4 16 17 8 18 Electricity Market Module Regions 1 - Texas Reliability Entity (ERCT) 2 - Florida Reliability Coordinating Council (FRCC) 3 - Midwest Reliability Organization - East (MROE) 4 - Midwest Reliability Organization - West (MROW) 5 - Northeast Power Coordinating Council / New England (NEWE) 6 - Northeast Power Coordinating Council / NYC - Westchester (NYCW) 7 - Northeast Power Coordinating Council / Long Island (NYLI) 8 - Northeast Power

  9. EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration started to prepare an EA to evaluate the environmental impacts of a proposal to reroute and renovate the Estes-Flatiron Three Transmission Lines in Larimer County, Colorado. Based on comments received during the scoping period, Western ended preparation of DOE/EA-1899 and announced its intent to prepare and environmental impact statement, DOE/EIS-0483.

  10. Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

    SciTech Connect (OSTI)

    1991-05-03

    This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

  11. EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

  12. EA-0587: Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of Northern States Power Company's  proposal to expand the Forbes Substation in Minnesota.

  13. EIS-0339: Presidential Permit Application, GenPower 500 kV Submarine Electric Transmission Cable from Nova Scotia to New York

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act of 1969 (NEPA) for GenPower New York, L.L.C.’s (GenPower) request for a Presidential permit for a proposed international electric transmission line.

  14. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  15. EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) and the Bureau of Indian Affairs (BIA), as joint lead agencies, prepared an EA that evaluates the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to replace the previous 100-foot right-of-way, which has expired.

  16. EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

  17. EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004)

    Broader source: Energy.gov [DOE]

    A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. ...

  18. Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line

    Broader source: Energy.gov [DOE]

    On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

  19. Accident Investigation of the July 30, 2013, Electrical Fatality on the Bandon-Rogue No. 1 115kV Line at the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Level I Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Level I Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting.

  20. Glacial Energy Holdings | Open Energy Information

    Open Energy Info (EERE)

    EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data Utility Id 54871 Utility Location Yes Ownership R NERC ERCOT Yes NERC MRO Yes NERC NPCC Yes NERC RFC Yes Activity...

  1. Village of Brainard, Nebraska (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    2010 - File1a1 EIA Form 861 Data Utility Id 2120 Utility Location Yes Ownership M NERC Location MRO Activity Retail Marketing Yes This article is a stub. You can help OpenEI by...

  2. City of Holdrege, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Location MRO Activity Buying Transmission Yes Activity Distribution Yes Activity Retail Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility Rate...

  3. Village of Wilcox, Nebraska (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    861 Data Utility Id 20641 Utility Location Yes Ownership M NERC Location MRO Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility...

  4. Northwest Rural Pub Pwr Dist | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 13805 Utility Location Yes Ownership P NERC Location WECC NERC MRO Yes RTO SPP Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  5. Kansas Gas & Electric Co | Open Energy Information

    Open Energy Info (EERE)

    SPP NERC ERCOT Yes NERC MRO Yes NERC RFC Yes NERC SERC Yes NERC SPP Yes ISO Ercot Yes RTO PJM Yes RTO SPP Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes...

  6. Nick's Utility | Open Energy Information

    Open Energy Info (EERE)

    Ownership F NERC Location WECC, MAPP NERC MRO Yes NERC SPP Yes NERC WECC Yes ISO CA Yes RTO SPP Yes ISO MISO Yes ISO Other Yes Activity Generation Yes Activity Transmission Yes...

  7. City of Spencer, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 17787 Utility Location Yes Ownership M NERC Location MRO NERC SPP Yes RTO SPP Yes Activity Distribution Yes Activity Bundled Services Yes This article is a stub....

  8. Loup Valleys Rural P P D | Open Energy Information

    Open Energy Info (EERE)

    Data Utility Id 11250 Utility Location Yes Ownership P NERC Location MRO NERC SPP Yes RTO SPP Yes Activity Distribution Yes This article is a stub. You can help OpenEI by...

  9. Burt County Public Power Dist | Open Energy Information

    Open Energy Info (EERE)

    NERC Location MRO Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility Rate...

  10. Materials Flows through Industry (MFI) Tool … AMO Analysis Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 0% SEP; national grid o Scenario B - HH Wetted Cathode (TRL - 7 ) Process; 0% SEP; ... 0% 0% 0% ELECTRICITY GRID, MRO 0% 0% 0% HH WETTED CATHODE 0% 100% 0% 0% 0% 0% ...

  11. Slide 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Krendale 138kV to Seneca 138kV Congestion slightly increases each study year. Will monitor in future analysis. WESTERN Congestion increases each study year. COOPER 230kV to Peach ...

  12. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County...

    Office of Environmental Management (EM)

    proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation...

  13. EIS-0436: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation...

  14. Property:ProjectName | Open Energy Information

    Open Energy Info (EERE)

    Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + 0.4 kV remote control + 2 220 kV SSSC device for power flow...

  15. EIS-0285-SA-112: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Vegetation Management Program Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV PDF icon Supplement...

  16. EIS-0323-S1: Draft Supplement Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV115kV ...

  17. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  18. EIS-0436: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  19. EIS-0436: EPA Notice of Availability of Final Environmental Impact...

    Energy Savers [EERE]

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  20. EIS-0436: Draft Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  1. News Item

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FIB Specifications Ion column Electron column Accel. voltage 10-30 kV 0.2 - 30 kV Resolution 7 nm 3 nm

  2. Word Pro - Untitled1

    U.S. Energy Information Administration (EIA) Indexed Site

    b Electric Noncoincident Peak Load and Capacity Margin: Winter Peak Period U.S.¹ Winter Peak Load,² All Interconnections, 1986-2011 Winter Capacity Margin, 1996-2011 U.S.¹ Winter Peak Load² by NERC³ Regional Assessment Area, 2011 U.S. Energy Information Administration / Annual Energy Review 2011 263 1986 1989 1992 1995 1998 2001 2004 2007 2010 0 100 200 300 400 500 600 700 Gigawatts 1996 1998 2000 2002 2004 2006 2008 2010 0 5 10 15 20 25 30 35 Percent 48 47 5 79 131 154 41 52 107 FRCC NPCC

  3. Word Pro - Untitled1

    U.S. Energy Information Administration (EIA) Indexed Site

    4 U.S. Energy Information Administration / Annual Energy Review 2011 Table 8.12a Electric Noncoincident Peak Load and Capacity Margin: Summer Peak Period, 1986-2011 (Megawatts, Except as Noted) Year Noncoincident Peak Load 1 by North American Electric Reliability Corporation (NERC) 2 Regional Assessment Area Capacity Margin 21 (percent) Eastern Interconnection ERCOT 4 Western Inter- connection All Inter- connections FRCC 5 NPCC 6 Balance of Eastern Region 3 ECAR 7,8 MAAC 8,9 MAIN 8,10 MAPP 11

  4. operation_tbl2_October_2011M.xlsx

    Gasoline and Diesel Fuel Update (EIA)

    Mean of Recovering 10.3 Billion Barrels 4. Production Schedules at Two Development Rates for the Statistical Mean of Recovering 10.3 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of Alaska fig4.jpg (4109

    Next Update: October 2007 Table 3a . January Monthly Peak Hour Demand, Actual by North American Electric Reliability Council Region, 1996 through 2004 (Megawatts) Month Year Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid ECAR FRCC MAAC

  5. monthly_peak_2003.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    O Form EIA-411 for 2005 Released: February 7, 2008 Next Update: October 2007 Table 3a . January Monthly Peak Hour Demand, Actual and Projected by North American Electric Reliability Council Region, 1996 through 2003 and Projected 2004 through 2005 (Megawatts and 2003 Base Year) Projected Monthly Base Year Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid ECAR FRCC MAAC MAIN MAPP/MR NPCC SERC SPP ERCOT WECC Peak Hour Demand (MW) Peak Hour Demand (MW) Peak Hour Demand (MW)

  6. winter_peak_2003.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    ) Form EIA-411 for 2005 Released: February 7, 2008 Next Update: October 2007 Table 2b . Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, 1990 through 2003 and Projected 2004 through 2008 (Megawatts and 2003 Base Year) Winter Noncoincident Peak Load Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC MAIN MAPP (U.S. NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990/1991 484,231 67,097

  7. "January","NERC Regional Assesment Area"

    U.S. Energy Information Administration (EIA) Indexed Site

    A.1. January monthly peak hour demand, by North American Electric Reliability Corporation Assesment Area, " "1996-2011 actual, 2012-2013 projected" "megawatts" "January","NERC Regional Assesment Area" ,,"Actual" ,,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "Eastern Interconnection","FRCC",39860,37127,27122,38581,37521,40258,39675,45033,35545,41247,34464,38352,41705,44945,53093,46086

  8. Electric Power Annual 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    Table 1. Net Energy for load, actual and projected by North American Electric Reliability Corporation Assessment Area, 1990-2011 actual, 2012-2016 projected thousands of megawatthours Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012E 2013E 2014E 2015E 2016E FRCC 142,502 146,903 147,464 153,468 159,861 169,021 173,377 175,557 188,384 188,598 196,561 200,134 211,116 219,021 220,335

  9. Electric Power Annual 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    B Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Corporation Region, 2001-2011 Actual, 2012-2016 Projected megawatts and percent Interconnection NERC Regional Assesment Area 2001/ 2002 2002/ 2003 2003/ 2004 2004/ 2005 2005/ 2006 2006/ 2007 2007/ 2008 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013E 2013/ 2014E 2014/ 2015E 2015/ 2016E 2016/ 2017E FRCC 39,699 42,001 36,229 41,449 42,493 45,993 46,093 45,042 51,703 45,954 39,924

  10. Next Update: November 2016

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy for load, actual and projected by North American Electric Reliability Corporation Assessment Area, 1990-2014 actual, 2015-2016 projected thousands of megawatthours Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015E 2016E FRCC 142,502 146,903 147,464 153,468 159,861 169,021 173,377 175,557 188,384 188,598 196,561 200,134 211,116 219,021 220,335 226,544 230,115

  11. Next Update: November 2016

    U.S. Energy Information Administration (EIA) Indexed Site

    4.A. Summer net internal demand, capacity resources, and capacity margins by North American Electric Reliability Corporation Region 1999 through 2014 actual, 2015-2016 projected megawatts and percent Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015E 2016E FRCC 27,162 27,773 28,898 29,435 30,537 31,649 31,868 32,874 34,562 34,832 35,666 38,932 37,951 40,387 42,243 45,950

  12. Next Update: November 2016

    U.S. Energy Information Administration (EIA) Indexed Site

    4.B Winter net internal demand, capacity resources, and capacity margins by North American Electric Reliability Corporation Region, 2001/2002-2014/2015 actual, 2015-2017 projected megawatts and percent Interconnection NERC Regional Assesment Area 2001/ 2002 2002/ 2003 2003/ 2004 2004/ 2005 2005/ 2006 2006/ 2007 2007/ 2008 2008/ 2009 2009/ 2010 2010/ 2011 2011/ 2012 2012/ 2013 2013/ 2014 2014/ 2015 2015/ 2016E 2016/ 2017E FRCC 39,699 42,001 36,229 41,449 42,493 45,993 46,093 45,042 51,703 45,954

  13. EIS-0285-SA-118: Supplement Analysis

    Broader source: Energy.gov [DOE]

    Transmission System Vegetation Management Program, Holcomb-Naselle 115kV, Pacific County, Washington

  14. Interplay between the structure and dynamics in liquid and undercooled boron: An ab initio molecular dynamics simulation study

    SciTech Connect (OSTI)

    Jakse, N.; Pasturel, A.

    2014-12-21

    In the present work, the structural and dynamic properties of liquid and undercooled boron are investigated by means of ab initio molecular dynamics simulation. Our results show that both liquid and undercooled states present a well pronounced short-range order (SRO) mainly due to the formation of inverted umbrella structural units. Moreover, we observe the development of a medium-range order (MRO) in the undercooling regime related to the increase of inverted umbrella structural units and of their interconnection as the temperature decreases. We also evidence that this MRO leads to a partial crystallization in the β-rhombohedral crystal below T = 1900 K. Finally, we discuss the role played by the SRO and MRO in the nearly Arrhenius evolution of the diffusion and the non-Arrhenius temperature dependence of the shear viscosity, in agreement with the experiment.

  15. Utility-Scale Solar Power Converter: Agile Direct Grid Connect Medium Voltage 4.7-13.8 kV Power Converter for PV Applications Utilizing Wide Band Gap Devices

    SciTech Connect (OSTI)

    2012-01-25

    Solar ADEPT Project: Satcon is developing a compact, lightweight power conversion device that is capable of taking utility-scale solar power and outputting it directly into the electric utility grid at distribution voltage levels—eliminating the need for large transformers. Transformers “step up” the voltage of the power that is generated by a solar power system so it can be efficiently transported through transmission lines and eventually “stepped down” to usable voltages before it enters homes and businesses. Power companies step up the voltage because less electricity is lost along transmission lines when the voltage is high and current is low. Satcon’s new power conversion devices will eliminate these heavy transformers and connect a utility-scale solar power system directly to the grid. Satcon’s modular devices are designed to ensure reliability—if one device fails it can be bypassed and the system can continue to run.

  16. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of Energy's Order No. 202-05-3 issued December 20, 2005 ("DOE Potomac River Order"), Pepco has filed notice of the planned...

  17. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Broader source: Energy.gov [DOE]

    Docket EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the...

  18. Effect of medium range order on pulsed laser crystallization of amorphous germanium thin films

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Li, T. T.; Bayu Aji, L. B.; Heo, T. W.; Santala, M. K.; Kucheyev, S. O.; Campbell, G. H.

    2016-06-03

    Sputter deposited amorphous Ge thin films had their nanostructure altered by irradiation with high-energy Ar+ ions. The change in the structure resulted in a reduction in medium range order (MRO) characterized using fluctuation electron microscopy. The pulsed laser crystallization kinetics of the as-deposited versus irradiated materials were investigated using the dynamic transmission electron microscope operated in the multi-frame movie mode. In conclusion, the propagation rate of the crystallization front for the irradiated material was lower; the changes were correlated to the MRO difference and formation of a thin liquid layer during crystallization.

  19. Slide 1

    U.S. Energy Information Administration (EIA) Indexed Site

    SWN ECA COP BHP SWN RDSA CVX WPX SWN COG EOG APA EQT OXY SWN RRC QEP UPL EP XCO CNX SWN NBL PXD SM NFX XEC MRO SD KWK PXP EGN CRK BBG FST SWN Ranked 5 th in U.S. Gas Production US ...

  20. ,"Table 6. Proposed High-voltage Transmission Line Additions...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...","MRO","-","AC","100-120",115,233,6,2010,"Dry Creek","Old Settlers",0.5,"OH","P","S","T2-...00-299",230,807,10,2009,"Gorgas","Miller Scrubber",0,"OH","tower","combination",1351,"ACSR...

  1. Next Update: December 2011

    Gasoline and Diesel Fuel Update (EIA)

    ... I 100 US MRO - AC 100-120 115 233 6 2010 Dry Creek Old Settlers 0.5 OH P S T2-477 ACSR 1 ... AC 200-299 230 807 10 2009 Gorgas Miller Scrubber 0.0 OH tower combinatio 1351 ACSR Single ...

  2. Untitled Document

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    voltage, WD 3mm). Accelerating voltage can vary continuously from 0.5 kV for resist imaging to 30 kV for EDS detection and metallic surface imaging. Stage motion ranges: X: 0...

  3. EIS-0183: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goodnoe Hills and White Creek Wind Energy Projects The Bonneville Power Administration ... (kV) substation along BPA's Wautoma - John Day No.1 500-kV transmission line. ...

  4. Microsoft Word - MITSUBISHI ELECTRIC Comments DOE RFI National...

    Energy Savers [EERE]

    ... reserve program are critical Extra-High Voltage (EHV) transformer applications with a high voltage rating of 230 kV and above, up to and including 765 kV class applications. ...

  5. EIS-0285-SA-84: Supplement Analysis | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet....

  6. Property:AwardeeHeadquarters | Open Energy Information

    Open Energy Info (EERE)

    Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + Denmark + 2 220 kV SSSC device for power flow control (Smart...

  7. Property:TimePeriod | Open Energy Information

    Open Energy Info (EERE)

    Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + Not available + 2 220 kV SSSC device for power flow control...

  8. Microsoft Word - Cover Page - Exhibit 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    115 120 125 130 135 140 145 150 155 Structure Quantity Structure Height EXHIBIT 5 Project Structure Height Breakdown - HVDC & 345-kV HVDC Structures 345-kV Structures 27-JUN-2013

  9. Baoding Tianwei Baobian Electric Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    activities are the manufacture and sale of 500, 330, 220, 110kV or under 100kV transformers, also has subsidiaries in integrated PV manufacture and wind turbine manufacture....

  10. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alvey Substation 500kV Shunt Reactor Addition This project will install a 500kV shunt reactor at the Alvey switching station. The addition of the shunt reactor is intended to lower...

  11. US Contribution

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The steady state electrical network is an AC power substation and distribution system that ... Power feeds: 4 * 2 feeds: 400 kV substation transformer, 22 kV distribution to load ...

  12. EIS-0451: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (kV) transmission line and a 138115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's ...

  13. NWTC Controllable Grid Interface (Fact Sheet), National Wind...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Controllable Grid Interface (CGI) for grid and fault simulation (7 MVA - under development) Xcel substation 13.8 kV 115 kV CGI bus NWTC wind turbines Alstom 3 MW Siemens 2.3 MW GE ...

  14. EIS-0399: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line...

  15. EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  16. EIS-0032: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company

  17. EA-1679: Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  18. EA-1679: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  19. EA-1679: Revision Sheet for Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Grand Coulee’s Third Power plant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  20. EA-1863: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Vegetation Management Plan for Glen Canyon to Pinnacle Peak 345-kV transmission line, Coconino National Forest, Arizona

  1. EA-1357: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Presidential Permit PP-26, Brownsville Public Utilities Board, Brownsville to Mexico 138 kV Transmission Line Project, Brownsville, Texas

  2. EA-1595: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Davis-Mead 230-kV Transmission Line Reconductor Project, Mohave County, Arizona and Clark County, Nevada

  3. EIS-0505: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  4. EIS-0505: Notice of Intent to Prepare Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington

  5. EIS-0505: Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  6. EA-1863: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Vegetation Management Plan for Glen Canyon to Pinnacle Peak 345-kV transmission line, Coconino National Forest, Arizona

  7. EA-1679: Preliminary Environmental Assessment

    Broader source: Energy.gov [DOE]

    Grand Coulee’s Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  8. EIS-0067: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

  9. EIS-0025: Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

  10. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon.

  11. Itaipu network spans all EHV voltages

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    The large Itaipu hydroelectric project on the Brazil-Paraguay border called for the construction of an interrelated network of 345-kV, 500-kV, 750-kV, and HVDC lines and substations on an unprecedented scale. The civil engineering and the electrical design are discussed.

  12. CX-008714: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  13. Paper Title (use style: paper title)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... secondary system, often using standard transformer impedances by kVA size and 100 feet of ... to 25kV 25kV to 35kV Fig. 12. CDF of feeder hosting capacity separated by voltage class. ...

  14. EIS-0323-S1: Sacramento Area Voltage Support Project Supplemental Environmental Impact Statement and Environmental Impact Report, Placer, Sacramento, and Sutter Counties, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas substations.

  15. Next Update: November 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    Next Update: November 2013 megawatts January NERC Regional Assesment Area 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 FRCC 39,860 37,127 27,122 38,581 37,521 40,258 39,675 45,033 35,545 41,247 34,464 38,352 41,705 44,945 53,093 46,086 NPCC 41,680 41,208 40,009 44,199 45,227 43,553 42,039 45,987 66,215 47,041 43,661 45,002 46,803 45,047 43,849 45,395 Balance of Eastern Region 322,095 335,954 307,784 343,981 347,724 349,937 340,525 377,419 371,550 381,698

  16. table01.chp:Corel VENTURA

    Gasoline and Diesel Fuel Update (EIA)

    2. Noncoincident Peak Load, by North American Electric Reliability Corporation Assessment Area, 1990-2010 Actual, 2011-2015 Projected (Megawatts) Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 FRCC 27,266 28,818 30,601 32,823 32,904 34,524 35,444 35,375 38,730 37,493 37,194 39,062 40,696 40,475 42,383 46,396 45,751 46,676 44,836 NPCC 44,116 46,594 43,658 46,706 47,581 47,705 45,094 49,269 49,566 52,855

  17. monthly_peak_bymonth_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    A.1. January Monthly Peak Hour Demand, by North American Electric Reliability Corporation Assesment Area, 1996-2010 Actual, 2011-2012 Projected (Megawatts) January NERC Regional Assesment Area 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011E 2012E FRCC 39,860 37,127 27,122 38,581 37,521 40,258 39,675 45,033 35,545 41,247 34,464 38,352 41,705 44,945 53,093 46,839 47,613 NPCC 41,680 41,208 40,009 44,199 45,227 43,553 42,039 45,987 66,215 47,041 43,661 45,002 46,803

  18. net_energy_load_2003.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    3 and Projected 2004 through 2008 (Thousands of Megawatthours and 2003 Base Year) Net Energy For Load (Annual) Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC MAIN MAPP (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990 2,886,496 442,507 142,502 221,099 197,326 127,102 250,681 485,205 252,037 209,789 558,248 1991 2,941,669 450,586 146,903 228,588 205,880 129,826 253,701 501,794 257,434 211,568 555,389 1992 2,942,910 450,853 147,464

  19. net_energy_load_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Assessment Area, 1990-2010 Actual, 2011-2015 Projected (Thousands of Megawatthours) Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 FRCC 142,502 146,903 147,464 153,468 159,861 169,021 173,377 175,557 188,384 188,598 196,561 200,134 211,116 NPCC 250,681 253,701 252,256 257,447 259,947 261,235 263,125 264,464 268,309 277,902 281,518 282,670

  20. peak_load_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Noncoincident Peak Load, by North American Electric Reliability Corporation Assessment Area, 1990-2010 Actual, 2011-2015 Projected (Megawatts) Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 FRCC 27,266 28,818 30,601 32,823 32,904 34,524 35,444 35,375 38,730 37,493 37,194 39,062 40,696 40,475 42,383 46,396 45,751 46,676 44,836 NPCC 44,116 46,594 43,658 46,706 47,581 47,705 45,094 49,269 49,566 52,855

  1. summer_capacity_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 FRCC 27,162 27,773 28,898 29,435 30,537 31,649 31,868 32,874 34,562 34,832 35,666 38,932 37,951 40,387 42,243 45,950 45,345 46,434 44,660 46,263 NPCC 46,016 45,952 46,007 46,380 47,465 48,290 48,950 50,240 51,760 53,450 54,270 55,888 55,164 53,936 51,580 57,402 60,879 58,221 59,896 55,730 Balance of Eastern Region 332,679 337,297 341,869 349,984

  2. winter_capacity_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    Table 4.B Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Corporation Region, 2001-2010 Actual, 2011-2015 Projected (Megawatts and Percent) Interconnection NERC Regional Assesment Area 2001/2002 2002/2003 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008 2008/2009 2009/2010 2010/ 2011 2011/2012E 2012/2013E 2013/2014E 2014/2015E 2015/2016E FRCC 39,699 42,001 36,229 41,449 42,493 45,993 46,093 45,042 51,703 45,954 44,196 44,750 45,350

  3. Electric Power Annual 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Noncoincident peak load, by North American Electric Reliability Corporation Assessment Area, 1990-2011 actual, 2012-2016 projected megawatts Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012E 2013E 2014E 2015E 2016E FRCC 27,266 28,818 30,601 32,823 32,904 34,524 35,444 35,375 38,730 37,493 37,194 39,062 40,696 40,475 42,383 46,396 45,751 46,676 44,836 46,550 45,722 44,968 45,613

  4. Electric Power Annual 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    A. Summer net internal demand, capacity resources, and capacity margins by North American Electric Reliability Corporation Region 1999 through 2011 actual, 2012-2016 projected megawatts and percent Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012E 2013E 2014E 2015E 2016E FRCC 27,162 27,773 28,898 29,435 30,537 31,649 31,868 32,874 34,562 34,832 35,666 38,932 37,951 40,387 42,243 45,950

  5. Next Update: November 2016

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Noncoincident peak load, by North American Electric Reliability Corporation Assessment Area, 1990-2014 actual, 2015-2016 projected megawatts Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015E 2016E FRCC 27,266 28,818 30,601 32,823 32,904 34,524 35,444 35,375 38,730 37,493 37,194 39,062 40,696 40,475 42,383 46,396 45,751 46,676 44,836 46,550 45,722 44,968 44,338 44,653

  6. Liquid Argon Dielectric Strength Measurements Sarah Lockwitz

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argon Dielectric Strength Measurements Sarah Lockwitz Fermilab LArTPC R&D Workshop July, 9 2014 Fermilab LAr Dielectric Strength July 9, 2014 S. Lockwitz et al. Recent Interest in LAr High Voltage (HV) 2 Experiment Voltage ICARUS 75 kV Darkside 50 60 kV MicroBooNE 128 kV CAPTAIN 50 kV LBNE 170 kV GLACIER 1-2 MV LAr Dielectric Strength July 9, 2014 S. Lockwitz et al. Recent Interest in LAr High Voltage (HV) * Noble liquids are becoming a popular detector medium 2 Experiment Voltage ICARUS 75

  7. CD-3, Approve Start of Construction/Execution | Department of Energy

    Office of Environmental Management (EM)

    CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion Study Workshop - Portland, OR December 13, 2011 Susan Henderson, P.E. Xcel Energy Path/TOT Ratings  TOT 1A - none  TOT 2A - none  TOT 3 ◦ Archer-Wayne Child Interconnection (150MW, 345kV) ◦ High Plains Express (500kV, 1600-8000MW) ◦ Zephyr (500kV DC, 3000MW) ◦ TransWest Express (600kV DC, 3000MW) ◦ Colorado-Wyoming Intertie (345kV, 800MW)  Reference: WECC Path Reports & Rating Catalog

  8. CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion Study Workshop - Portland, OR December 13, 2011 Susan Henderson, P.E. Xcel Energy Path/TOT Ratings  TOT 1A - none  TOT 2A - none  TOT 3 ◦ Archer-Wayne Child Interconnection (150MW, 345kV) ◦ High Plains Express (500kV, 1600-8000MW) ◦ Zephyr (500kV DC, 3000MW) ◦ TransWest Express (600kV DC, 3000MW) ◦ Colorado-Wyoming Intertie (345kV, 800MW)  Reference: WECC Path Reports & Rating Catalog

  9. Impact of deformation on the atomic structures and dynamics of a Cu-Zr metallic glass: A molecular dynamics study

    SciTech Connect (OSTI)

    Zhang, Y.; Mendelev, M. I.; Wang, C. Z.; Ott, R.; Zhang, F.; Besser, M. F.; Ho, K. M.; Kramer, M. J.

    2014-11-03

    Despite numerous studies on the atomic structures of Cu-Zr metallic glasses (MGs), their inherent structural ordering, e.g., medium-range order (MRO), remains difficult to describe. Specifically lacking is an understanding of how the MRO responds to deformation and the associated changes in atomic mobility. In this paper, we focus on the impact of deformation on MRO and associated effect on diffusion in a well-relaxed Cu64.5Zr35.5 MG by molecular dynamics simulations. The Cu-Zr MG exhibits a larger elastic limit of 0.035 and a yield stress of 3.5 GPa. The cluster alignment method was employed to characterize the icosahedral short-range order (ISRO) and Bergman-type medium-range order (BMRO) in the models upon loading and unloading. From this analysis, we find the disruption of both ISRO and BMRO occurs as the strain reaches about 0.02, well below the elastic limit. Within the elastic limit, the total fractions of ISRO or BMRO can be fully recovered upon unloading. The diffusivity increases six to eight times in regions undergoing plastic deformation, which is due to the dramatic disruption of the ISRO and BMRO. As a result, by mapping the spatial distributions of the mobile atoms, we demonstrate the increase in atomic mobility is due to the extended regions of disrupted ISRO and more importantly BMRO.

  10. Impact of deformation on the atomic structures and dynamics of a Cu-Zr metallic glass: A molecular dynamics study

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhang, Y.; Mendelev, M. I.; Wang, C. Z.; Ott, R.; Zhang, F.; Besser, M. F.; Ho, K. M.; Kramer, M. J.

    2014-11-03

    Despite numerous studies on the atomic structures of Cu-Zr metallic glasses (MGs), their inherent structural ordering, e.g., medium-range order (MRO), remains difficult to describe. Specifically lacking is an understanding of how the MRO responds to deformation and the associated changes in atomic mobility. In this paper, we focus on the impact of deformation on MRO and associated effect on diffusion in a well-relaxed Cu64.5Zr35.5 MG by molecular dynamics simulations. The Cu-Zr MG exhibits a larger elastic limit of 0.035 and a yield stress of 3.5 GPa. The cluster alignment method was employed to characterize the icosahedral short-range order (ISRO) andmore » Bergman-type medium-range order (BMRO) in the models upon loading and unloading. From this analysis, we find the disruption of both ISRO and BMRO occurs as the strain reaches about 0.02, well below the elastic limit. Within the elastic limit, the total fractions of ISRO or BMRO can be fully recovered upon unloading. The diffusivity increases six to eight times in regions undergoing plastic deformation, which is due to the dramatic disruption of the ISRO and BMRO. As a result, by mapping the spatial distributions of the mobile atoms, we demonstrate the increase in atomic mobility is due to the extended regions of disrupted ISRO and more importantly BMRO.« less

  11. Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

  12. Type A Accident Investigation Report – Western Area Power Administration Investigation of the June 7, 2004, Construction Contractor Electrical Accident at Double-Circuit Structure 38/1, Watertown-Granite Falls 230-kV Transmission Line East of Watertown, S

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type A Accident Investigation board appointed by Timothy J. Meeks, Chief Operating Officer, Western Area Power Administration.

  13. Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun

    SciTech Connect (OSTI)

    F.E. Hannon, A.S. Hofler, R. Kazimi

    2011-03-01

    Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations.

  14. EIS-0436: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0436: Final Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power Administration (BPA) issued a Final EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near

  15. Isolated trigger pulse generator

    DOE Patents [OSTI]

    Aaland, K.

    1980-02-19

    A trigger pulse generation system capable of delivering a multiplicity of isolated 100 kV trigger pulses with picosecond simultaneity. 2 figs.

  16. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the...

  17. EIS-0285-SA-149: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission System Vegetation Management Program Vegetation Management for the Captain Jack-Malin 1 500 kV transmission line from structure 24 to Malin Substation (reference...

  18. TransWest | Open Energy Information

    Open Energy Info (EERE)

    General NEPA Document Info Environmental Analysis Type EIS Applicant Western Power Administration Transmission Type 600kV Project Area Wyoming Time Frame (days) Participating...

  19. EA-1611: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    LLC applied to Western Area Power Administration to interconnect a 90-megawatt wind power facility with Western's existing Sterling-Frenchman Creek 115-kV transmission line....

  20. EIS-0344: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington and implement the proposed action...

  1. EIS-0005-FS: Draft Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

  2. EA-0587: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

  3. ANUEADflM-31 Electric Power High-Voltage Transmission Lines:

    Office of Scientific and Technical Information (OSTI)

    ......... 42 26 Underground Configuration for 230-kV ac ... Empire State Electric Energy Research .Gorp. Energetics, Inc. Florida Electric Power ...

  4. EIS-0005-FS: Final Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

  5. NETL F 451.1/1-1, Categorical Exclusion Designation Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sacramento, CA None OEOEPMEDTD Ryan Watson SMUD Resilient Grid Initiative Install SCADA switches on 69 kV circuits for automatic sectionalizing and fault location and install...

  6. EIS-0505: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, ...

  7. EIS-0285-SA-132: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Vegetation Management Program Vegetation Management for portion of the Big Eddy - Ostrander 1 500 kV transmission line located from tower structure 312 to 393...

  8. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  9. EIS-0285-SA-129: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission System Vegetation Management Program Vegetation Management for the Ashe-Marion 2 500 kV transmission line from structure 1502 through structure 1577. Bonneville...

  10. Karren L. More, Ph.D. Leader, Microscopy Group Oak Ridge National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with single atom sensitivity Instrument Specifications: * Cold field emission gun * 3 rd generation C 3 C 5 aberration corrector * 60-100kV operation * <1 spatial ...

  11. _Dear Reader_Cover Sheet_Master Table of Contents

    Energy Savers [EERE]

    ... electrical grid). The potential environmental impacts resulting from connected actions (wind energy generation and ... 600kV Lattice Crossing Structure Figure 2.1-26: AC ...

  12. RAPID/Geothermal/Transmission Siting & Interconnection/Utah ...

    Open Energy Info (EERE)

    of 230 kV. The line must be located on state land for this to apply. Public Utility Definition for Transmission Facility: "Public utilities" include "electric corporations,"...

  13. RAPID/Geothermal/Transmission Siting & Interconnection/Idaho...

    Open Energy Info (EERE)

    Commission (PUC). 12 Transmission Siting Threshold: NIETC - 115kV Public Utility Definition for Transmission Facility: The term "public utility" includes every common...

  14. EA-1595: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor ...

  15. Bureau of Land Management’s Environmental Assessment

    Broader source: Energy.gov [DOE]

    T G Power LLC Hot Sulphur Springs Transmission Line, 120 kV Electric Power Line, Northern Independence Valley, Elko County, Nevada

  16. EA-0587: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

  17. Vietnam-World Bank Climate Projects | Open Energy Information

    Open Energy Info (EERE)

    electricity access will be improved by upgrading, and strengthening the 110 KV sub-transmission line, and substations, restoring five existing hydropower plants, and, by...

  18. Searchlight Wind Energy Project FEIS Appendix A

    Office of Environmental Management (EM)

    Area Power Administration Substation) Prepared for: U.S. Department of Interior Bureau of Land Management Las ... GIS geographic information system kV kilovolt MW megawatt ...

  19. Design requirements document for the phase 1 privatization electrical power system

    SciTech Connect (OSTI)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  20. EIS-0486: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to ...

  1. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    373,42373,23.75,23.75,23.75,2.52,800,1,2 "ERCOT North 345KV Peak","application/vnd.ms-excel",42374,42374,22.75,22.5,22.63,-1.12,1600,2,2 "ERCOT North 345KV Peak","application/vnd.ms-excel",42375,42375,20,19.75,19.81,-2.82,14400,15,10 "ERCOT North 345KV Peak","application/vnd.ms-excel",42376,42376,19,18.5,18.61,-1.2,16000,20,9 "ERCOT North 345KV

  2. Comments from the Virginia Department of Environmental Quality...

    Broader source: Energy.gov (indexed) [DOE]

    Quality (DEQ) strongly opposes the Potomac Electric Power Company's (PEPCO) intention to commence planned maintenance outages of the 230kV transmission lines that serve the ...

  3. Comments from the Virginia Department of Environmental Quality...

    Energy Savers [EERE]

    transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the Virginia Department of Environmental Quality ...

  4. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership September 1, 2008 EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line August 29, 2008 EIS-0370: Draft...

  5. EIS-0399: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a...

  6. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Office of Environmental Management (EM)

    ... (e) Plumbing, electrical utility, lighting, and ... calibration of facility components, subsystems, or pmtable ... No. 3) 345-kV Transmission Line and Curecanti-Lost Canyon ...

  7. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Office of Environmental Management (EM)

    ... (e) Plumbing, electrical utility, lighting, and ... 230-kV Transmission Line Cross Bar Ranch Project (j) ... calibration of facility components, subsystems, or portable ...

  8. Isolated trigger pulse generator

    DOE Patents [OSTI]

    Aaland, Kristian (Livermore, CA) [Livermore, CA

    1980-02-19

    A trigger pulse generation system capable of delivering a multiplicity of isolated 100 kV trigger pulses with picosecond simultaneity.

  9. EA-1863: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest, Flagstaff, Arizona

  10. Bonneville upgrades lines

    SciTech Connect (OSTI)

    Not Available

    1993-08-30

    A stretch of Bonneville Power Administration transmission line between Spokane and the Grand Coulee Dam is an 82-mile bottleneck as it is the last 115-kv section of [open quotes]road[close quotes] along a 500-kv transmission [open quotes]highway[close quotes]. Soon the administration will change all that. A number of independent and utility powerplants have been proposed in Idaho, Montana and the Spokane, Wash., area during the 1990s. As the operators will need to move their power, Bonneville is planning to build a $144-million, 500-kv line to upgrade the 115-kv section. The agency is planning to use its existing right-of-way.

  11. EIS-0451: Hooper Springs Transmission Project, Caribou County...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's...

  12. EIS-0344: Draft Envrionmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed...

  13. Bordertown to California Transmission | Open Energy Information

    Open Energy Info (EERE)

    Transmission EIS Bordertown to California 120kV Transmission Line Project Environmental Impact Statement General NEPA Document Info Energy Sector Transmission Environmental...

  14. EIS-0294: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    (kV) transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP). DOEEIS-0294, Department of Energy, Western Area Power Administration,...

  15. CX-007736: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy

  16. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    42009,42009,40,39,39.5,10.58,1600,2,3 "ERCOT North 345KV Peak","applicationvnd.ms-excel",42010,42010,29.5,28.5,29.07,-10.43,12000,15,12 "ERCOT North 345KV Peak","application...

  17. CX-010107: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Curecanti-Morrow Point 230 Kilovolt (kV) and 12.47-kV Transmission Lines Access Road Maintenance CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  18. OFFICE OF RIVER PROTECTION P.O. Box 450, MSIN H6-60

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Reference 4). * De-scope 13.8kV and A8 Substation (Reference 5). * De-scope C-101 3 rd ... May 16, 2014) * De-scope 13.8kV and A8 Substation (WRPS-1204058 R3, dated June 6, 2013) * ...

  19. Letter from the Department of Energy to the District of Columbia Public Service Commission RE Docket No. EO-05-01

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. PEPCO has informed DOE that the first new 230 kV line is expected to be completed by June 2, 2007. The outage for the second new 230 kV line is expected to begin immediately...

  20. Improved quality of intrafraction kilovoltage images by triggered readout of unexposed frames

    SciTech Connect (OSTI)

    Poulsen, Per Rugaard; Jonassen, Johnny; Jensen, Carsten; Schmidt, Mai Lykkegaard

    2015-11-15

    Purpose: The gantry-mounted kilovoltage (kV) imager of modern linear accelerators can be used for real-time tumor localization during radiation treatment delivery. However, the kV image quality often suffers from cross-scatter from the megavoltage (MV) treatment beam. This study investigates readout of unexposed kV frames as a means to improve the kV image quality in a series of experiments and a theoretical model of the observed image quality improvements. Methods: A series of fluoroscopic images were acquired of a solid water phantom with an embedded gold marker and an air cavity with and without simultaneous radiation of the phantom with a 6 MV beam delivered perpendicular to the kV beam with 300 and 600 monitor units per minute (MU/min). An in-house built device triggered readout of zero, one, or multiple unexposed frames between the kV exposures. The unexposed frames contained part of the MV scatter, consequently reducing the amount of MV scatter accumulated in the exposed frames. The image quality with and without unexposed frame readout was quantified as the contrast-to-noise ratio (CNR) of the gold marker and air cavity for a range of imaging frequencies from 1 to 15 Hz. To gain more insight into the observed CNR changes, the image lag of the kV imager was measured and used as input in a simple model that describes the CNR with unexposed frame readout in terms of the contrast, kV noise, and MV noise measured without readout of unexposed frames. Results: Without readout of unexposed kV frames, the quality of intratreatment kV images decreased dramatically with reduced kV frequencies due to MV scatter. The gold marker was only visible for imaging frequencies ≥3 Hz at 300 MU/min and ≥5 Hz for 600 MU/min. Visibility of the air cavity required even higher imaging frequencies. Readout of multiple unexposed frames ensured visibility of both structures at all imaging frequencies and a CNR that was independent of the kV frame rate. The image lag was 12.2%, 2

  1. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  2. Use of polypropylene fibers coated with nano-silica particles into a cementitious mortar

    SciTech Connect (OSTI)

    Coppola, B. Di Maio, L.; Scarfato, P.; Incarnato, L.

    2015-12-17

    Fiber reinforced cementitious composite (FRCC) materials have been widely used during last decades in order to overcome some of traditional cementitious materials issues: brittle behaviour, fire resistance, cover spalling, impact strength. For composite materials, fiber/matrix bond plays an important role because by increasing fiber/matrix interactions is possible to increase the behaviour of the entire material. In this study, in order to improve fiber to matrix adhesion, two chemical treatments of polypropylene fibers were investigated: alkaline hydrolysis and nano-silica sol-gel particles deposition. Treatmtents effect on fibers morphology and mechanical properties was investigated by scanning electron microscopy (SEM) and tensile tests. SEM investigations report the presence of spherical nano-silica particles on fiber surface, in the case of sol-gel process, while alkaline hydrolysis leads to an increase of fibers roughness. Both treatments have negligible influence on fibers mechanical properties confirming the possibility of their use in a cementitious mortar. Pullout tests were carried out considering three embedded length of fibers in mortar samples (10, 20 and 30 mm, respectively) showing an increase of pullout energy for treated fibers. The influence on fiber reinforced mortar mechanical properties was investigated by three-point flexural tests on prismatic specimens considering two fibers length (15 and 30 mm) and two fibers volume fractions (0.50 and 1.00 %). A general increase of flexural strength over the reference mix was achieved and an overall better behaviour is recognizable for mortars containing treated fibers.

  3. County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    electrical equipment replacementat Gila Substation in Yuma County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace a 34.5-kV circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads

  4. Revenue metering error caused by induced voltage from adjacent transmission lines

    SciTech Connect (OSTI)

    Hughes, M.B. )

    1992-04-01

    A large zero sequence voltage was found to have been induced onto a 138 kV line from adjacent 500 kV lines where these share the same transmission right-of-way. This zero sequence voltage distorted the 2-1/2-element revenue metering schemes used for two large industrial customer supplied directly from the affected 138 kV line. As a result, these two customers were overcharged, on average, approximately 3.5% for 15 years. This paper describes the work done to trace the origins of the zero sequence voltage, quantify the metering error, and calculate customer refunds which, in the end, totalled $4 million.

  5. Re: Potomac River Generating Station Department of Energy, Case No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits | Department of Energy evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the

  6. An Image-Guided Study of Setup Reproducibility of Postmastectomy Breast Cancer Patients Treated With Inverse-Planned Intensity Modulated Radiation Therapy

    SciTech Connect (OSTI)

    Feng, Christine H.; Gerry, Emily; Chmura, Steven J.; Hasan, Yasmin; Al-Hallaq, Hania A.

    2015-01-01

    Purpose: To calculate planning target volume (PTV) margins for chest wall and regional nodal targets using daily orthogonal kilovolt (kV) imaging and to study residual setup error after kV alignment using volumetric cone-beam computed tomography (CBCT). Methods and Materials: Twenty-one postmastectomy patients were treated with intensity modulated radiation therapy with 7-mm PTV margins. Population-based PTV margins were calculated from translational shifts after daily kV positioning and/or weekly CBCT data for each of 8 patients, whose surgical clips were used as surrogates for target volumes. Errors from kV and CBCT data were mathematically combined to generate PTV margins for 3 simulated alignment workflows: (1) skin marks alone; (2) weekly kV imaging; and (3) daily kV imaging. Results: The kV data from 613 treatment fractions indicated that a 7-mm uniform margin would account for 95% of daily shifts if patients were positioned using only skin marks. Total setup errors incorporating both kV and CBCT data were larger than those from kV alone, yielding PTV expansions of 7 mm anterior–posterior, 9 mm left–right, and 9 mm superior–inferior. Required PTV margins after weekly kV imaging were similar in magnitude as alignment to skin marks, but rotational adjustments of patients were required in 32% ± 17% of treatments. These rotations would have remained uncorrected without the use of daily kV imaging. Despite the use of daily kV imaging, CBCT data taken at the treatment position indicate that an anisotropic PTV margin of 6 mm anterior–posterior, 4 mm left–right, and 8 mm superior–inferior must be retained to account for residual errors. Conclusions: Cone-beam CT provides additional information on 3-dimensional reproducibility of treatment setup for chest wall targets. Three-dimensional data indicate that a uniform 7-mm PTV margin is insufficient in the absence of daily IGRT. Interfraction movement is greater than suggested by 2-dimensional

  7. Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a double circuit upgrade and structure replacement along the existing Casa Grande-Empire 11~-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Casa Grande-Empire115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line,

  8. Coupled Thermal-Hydrological-Mechanical Processes in Salt, Hot Granular

    Office of Environmental Management (EM)

    electrical equipment replacementat Gila Substation in Yuma County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace a 34.5-kV circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads

  9. RadiaBeam PPT template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    area Magnetic measurements lab Optics lab Hot test cell (up to 9 MeV) ... 1. Thermionic gun (60 kV) 2. Magnetic optics 3. Hoppers 4. Mechanical rake 5. Built ...

  10. EA-1595: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Davis-Mead 230-kV Transmission Line from Western's Davis substation near Bullhead City, Mohave County, Arizona to its Mead substation near Boulder City, Clark County, Nevada. ...

  11. CX-010428: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  12. EA-1891: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    The project would rebuild the aging 97.5-mile-long 230- kilovolt (kV) Alvey-Fairview transmission line in Lane, Douglas, and Coos counties, Oregon. This MAP is for the Proposed ...

  13. EA-1912: Draft Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. ...

  14. Judith Kimling1, Theo Gerhardt1, ...

    Office of Scientific and Technical Information (OSTI)

    ... < > C for 30 min, and exposed with a scanning electron microscope at 10kV. After development, ... imaged by transmission soft x-ray microscopy at the XM-1 full field microscope at ...

  15. EIS-0285-SA-148: Supplement Analysis | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    project with US Forest Service for vegetation control for the McNary- Santiam 2 230 kV transmission line that enhances wildlife habitat under powerlines Supplement Analysis for...

  16. Property:HeadquartersCity | Open Energy Information

    Open Energy Info (EERE)

    25 pages using this property. (previous 25) (next 25) 2 220 kV SSSC device for power flow control (Smart Grid Project) + Catalonia + 4 44 Tech Inc. Smart Grid Demonstration Project...

  17. EIS-0422: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40–Mile-Long 500-kilovolt (kV) Transmission Line

  18. EIS-0129: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Draft Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications ...

  19. EIS-0285-SA-95: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chehalis-Centralia No. 2, 230kV transmission line. The project area is located within Lewis and Thurston Counties, Washington PDF icon Supplement Analysis for the Transmission...

  20. Microsoft Word - Mirant February 07 order draft DRH mark 4.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... to operate to achieve full power in Line Outage situations, and the need for the Order after the new 230 kV lines are operational. * Further consideration of mitigation measures. ...

  1. Property:NEPA Completion Notes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  2. Property:CompletionNotes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  3. ANUEADflM-31 Electric Power High-Voltage Transmission Lines:

    Office of Scientific and Technical Information (OSTI)

    ... design options to reduce human exposure to EMFs from high-voltage transmission lines. ... assumed for the 345-kV designs: 150-R rights-of-way for overhead lines, 50-ft ...

  4. EIS-0365: Record of Decision and Floodplain Statement of Findings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Record of Decision and Floodplain Statement of Findings EIS-0365: Record of Decision and Floodplain Statement of Findings Imperial-Mexicali 230-kV Transmission Lines DOE announces...

  5. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-XXXXP Leveraging In-Memory KeyValue Stores in HPC Kelpie Craig Ulmer Overview: Leveraging KV Stores NoSQL: Dramatic impact on Out-of-Core processing Frameworks handle...

  6. DNA origami: A quantum leap for self assembly of complex structures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DNA origami: A quantum leap for self assembly of complex structures Authors: Trring, T., Voigt, N.V., Nangreave, J., Yan, H., and Gothelf, K.V. Title: DNA origami: A quantum leap...

  7. CX-009705: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  8. BPA-2011-00507-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    management on my land. Please note location: Satsop Aberdeen 2 230kV Transmission Line right-of-way corridor, parcel 180933 130000, Steve W. Narolski, Program Manager 3. We have...

  9. 09-032 FOIA Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facilities for the State of Montana, as of December 31, 2008, is as reported below. Garrison-Taft No. 1 & 2, 500 kV transmission lines 179,859,325 Broadview-Garrison No. 1 & 2...

  10. 09-032 FOIA Correspondence.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    your request. You have requested copies of the following: 1. Total investment in the Garrison to Taft 500 kv transmission line facilities in Montana for the year ending 1231...

  11. Pacific DC Intertie Upgrade Project Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T I O N Pre-Decisional. For Discussion Purposes Only. PDCI Upgrade Project Replace aging Celilo 4 converter terminal with a new 2 converter terminal rated 560kV and 3410A...

  12. EIS-0231: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV)...

  13. EA-1383: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Amendment of Presidential Permit (PP-68) for San Diego Gas and Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230-kV Transmission Line, San Diego, California

  14. EIS-0296: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division...

  15. EA-1739: Finding of No Significant Impact | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    (Figure 1-1). This 46-mile, 115-kilovolt1 (kV) transmission line, located between the BPA Bandon Substation and the BPA Rogue Substation in Coos and Curry counties, is old,...

  16. Y-12's 1958 nuclear criticality accident and increased safety...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    accident and increased safety - 1958 brought accidents, more safety The first X-ray machine was brought to Y-12 in February, 1949. It was a 1,000 KV system installed in Building...

  17. News Item

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    200 kV Spherical Aberration Cs: 1.2mm Chromatic Aberration Cc: 1.2mm Detectors Oxford INCA energy dispersive X-ray detector with energy resolution of 136eV for Mn k-alpha...

  18. Development of high-voltage pulse-slicer unit with variable pulse duration for pulse radiolysis system

    SciTech Connect (OSTI)

    Upadhyay, J.; Sharma, M. L.; Navathe, C. P.; Toley, M. A.; Shinde, S. J.; Nadkarni, S. A.; Sarkar, S. K.

    2012-02-15

    A high-voltage pulse-slicer unit with variable pulse duration has been developed and integrated with a 7 MeV linear electron accelerator (LINAC) for pulse radiolysis investigation. The pulse-slicer unit provides switching voltage from 1 kV to 10 kV with rise time better than 5 ns. Two MOSFET based 10 kV switches were configured in differential mode to get variable duration pulses. The high-voltage pulse has been applied to the deflecting plates of the LINAC for slicing of electron beam of 2 {mu}s duration. The duration of the electron beam has been varied from 30 ns to 2 {mu}s with the optimized pulse amplitude of 7 kV to get corresponding radiation doses from 6 Gy to 167 Gy.

  19. EIS-0451: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    transmission line and a 138115-kV substation (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would...

  20. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  1. Property:NEPA Resource Analysis | Open Energy Information

    Open Energy Info (EERE)

    NV-063-EA06-098 NV-EA-030-07-05 North Steens 230kV Transmission O One Nevada S Sigurd Red Butte No2 Sun Valley to Morgan Transmission Line Sunzia Southwest T Tehachapi Renewable...

  2. Sigurd Red Butte No2 | Open Energy Information

    Open Energy Info (EERE)

    Sigurd Red Butte No2 Jump to: navigation, search NEPA Document Collection for: Sigurd Red Butte No2 EIS for NA Sigurd to Red Butte No. 2 345kV Transmission Project General NEPA...

  3. RAPID/BulkTransmission/Utah | Open Energy Information

    Open Energy Info (EERE)

    Administration Current Projects Transwest Express Zephyr Populus to Ben Lomand Sigurd to Red Butte No. 2 345kV Transmission Project Print PDF RAPID-State-Summary Retrieved from...

  4. EIS-0443: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near...

  5. DOE/EIS-0485 Final Environmental Impact Statement Grande Prairie...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grande Prairie Wind has applied to Western to interconnect the proposed Project to Western's 345-kilovolt (kV) Fort Thompson to Grand Island transmission line at a new switchyard. ...

  6. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    re initiated scoping for an EIS to evaluate the potential environmental impacts of a proposal to construct a new 500-kV transmission line from northeast Oregon to southwest Idaho. ...

  7. BUREAU OF LAND MANAGEMENT Farmington District Office 6251 College...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Tri-State), the applicant, to construct, operate and maintain a new 230 kV overhead electric transmission line. The BLM Farmington Field Office is the lead for this Project. ...

  8. EIS-0507: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    their intent to prepare an EIS to evaluate the potential environmental impacts of a proposal to construct a new 500-kV transmission line from northeast Oregon to southwest Idaho. ...

  9. EA-2002: Finding of No Significant Impact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-2002: Finding of No Significant Impact Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona Western Area Power Administration issued a ...

  10. EIS-0414: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    construct, operate, maintain, and connect a double-circuit, 230,000-volt (230-kV) electric transmission line across the U.S.-Mexico border in eastern San Diego County, California. ...

  11. EA-1912: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Midway-Benton No. 1 transmission line and approximately 11 miles of the 115-kV Benton-Othello No. 1 transmission line between the existing Midway and Benton Substations, located...

  12. State Grid Corp | Open Energy Information

    Open Energy Info (EERE)

    State Grid Corp Jump to: navigation, search 2011-2015 Plans for 1000kV transmission lines (UHV) 1 http:www.chinadaily.com.cnbusiness2010-0813content11148692.htm...

  13. Type B Accident Investigation Report of the Arc Flash at Brookhaven...

    Energy Savers [EERE]

    ... CAS electronic technician 1 began cleaning up the tools used. CAS electronic technician 2 began positioning the screw-drive motor for re-racking the13.8-kV circuit breaker for the ...

  14. Sandia National Laboratories: Other Facilities and Capabilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Facilities and Capabilities High Voltage Breakdown Testing We can perform high voltage standoff testing with DC and pulsed voltages. DC testing can be conducted up to 200 kV....

  15. SAS Output

    U.S. Energy Information Administration (EIA) Indexed Site

    B. U.S. Transformer Sustained Automatic Outage Counts and Hours by High-Voltage Size and NERC Region, 2013 Sustained Automatic Outage Counts High-Side Voltage (kV) Eastern...

  16. EIS-0421: Big Eddy-Knight Transmission Line

    Broader source: Energy.gov [DOE]

    BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line...

  17. Wind Development on the Rosebud

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP was issued in Fall of 2007 Rosebud Sioux Tribe and Citizens Wind entered into an MOA ... WAPA 115 kv, and Cherry Todd Substation RST Met tower installed Fall of 2003 Citizens Wind ...

  18. Microsoft Word - titlepage.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MS-1152 Albuquerque, New Mexico 87185 USA Abstract 1 Measurements on a 30 kV electron gun with ten independent cathodes, operating in a 6.5 Tesla (T) magnetic field are presented. ...

  19. Microsoft PowerPoint - Haught Innovative Materials Grid Components...

    Office of Environmental Management (EM)

    ... World's first HTS cable energized 1990 10 meter length of 1G wire produced 1993 2.5 tesla HTS coil demonstrated 1991 First 2G tape demonstrated 1996 2.4 kV HTS current ...

  20. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... Improved DC Gun and Insulator Assembly Neubauer, Michael ; Johnson, Rolland P Many user ... A novel gun design with gradients around 5 MVm and operating at 350 kV, a major ...

  1. EA-1665: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV...

  2. Integrating wind turbines into the Orcas Island distribution system

    SciTech Connect (OSTI)

    Zaininger, H.W.

    1998-09-01

    This research effort consists of two years of wind data collection and analysis to investigate the possibility of strategically locating a megawatt (MW) scale wind farm near the end of an Orcas Power and light Company (OPALCO) 25-kilovolt (kV) distribution circuit to defer the need to upgrade the line to 69 kV. The results of this study support the results of previous work in which another year of wind data and collection was performed. Both this study and the previous study show that adding a MW-scale wind farm at the Mt. Constitution site is a feasible alternative to upgrading the OPALCO 25-kV distribution circuit to 69 kV.

  3. EA-1685: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Planet Tap 69-kV Transmission Line Rebuild, Upgrade and Right-Of-Way Action The potential impacts to the environment are discussed in detail within this document. This EA provides...

  4. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    009,42009,40,39,39.5,10.58,1600,2,3 "ERCOT North 345KV Peak","application/vnd.ms-excel",42010,42010,29.5,28.5,29.07,-10.43,12000,15,12 "ERCOT North 345KV Peak","application/vnd.ms-excel",42012,42012,43,41.5,42.25,13.18,6400,8,9 "ERCOT North 345KV Peak","application/vnd.ms-excel",42013,42013,31,29.5,29.86,-12.39,17600,20,11 "ERCOT North 345KV Peak","application/vnd.ms-excel",42016,42016,28.75,27.25,27.7,-2.16,4000,5,7

  5. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  6. Re: Potomac River Generating Station Department of Energy, Case...

    Broader source: Energy.gov (indexed) [DOE]

    Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages.

  7. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Environmental Management (EM)

    LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, ... and findings made during the maintenance outages for Pepco's two 230 kV circuits from the ...

  8. Re: Potomac River Generating Station Department of Energy, Case...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  9. Operating Plan of Mirant Potomac River, LLC in Compliance with...

    Broader source: Energy.gov (indexed) [DOE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

  10. Microsoft Word - DOE-ID-INL-16-069 (1).docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Thus, if faults occur causing power outages in the test power circuits, separate power on the 13.8kV OHL to the user locations for instrumentation or control related power needs ...

  11. Potomac River Project Outage Schedule Clarification | Department...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  12. Department of Energy Order No. 202-07-1 | Department of Energy

    Office of Environmental Management (EM)

    Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Notice of Unplanned Outage at the Mirant ...

  13. Microsoft Word - DOE-ID-INL-15-046.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Thus, if faults occur causing power outages in the test power circuits, separate power on the 13.8kV OHL to the user locations for instrumentation or control related power needs ...

  14. CX-008775: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Archer KV1A Replacement Laramie County, Wyoming CX(s) Applied: B4.6 Date: 05/24/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  15. J319.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MISO Project Number J319 Point of Interconnection Entergy AR ANO-Pleasant Hill 500 kV line ... Page 1 of 3 February 10, 2014 MISO Project Number J319 Point of Interconnection Holland ...

  16. FERC Pleading Template

    Broader source: Energy.gov (indexed) [DOE]

    ... CapX energized the first segment (Monticello to St. Cloud) of the Fargo-St. Cloud 345 kV ... whether they be pooled systems as in Georgia, Indiana, and Minnesota or an LSE transco ...

  17. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    93016 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  18. BPA-2012-00860-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    following: Contract issued to HICO America on September 15, 2009, for Lot 1, 525kV transformers, to include unit pricing for each transformer rating available for purchase under...

  19. BPA-2012-00862-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract issued to Hyundai Heavy Industries on November 13, 2009, for Lot 2, 230kV transformers, to include unit pricing for each transformer rating available for purchase under...

  20. BPA-2013-01283-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    contracts contain these products and decide how to proceed from there. 1. Power Transformers 69kV and above (step up & step down) Key Attributes: High side Rated kV-Low Rated...

  1. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    thru FY14 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  2. BPA-2012-00860-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Request: Contract issued to HICO America on September 15, 2009, for Lot 1, 525kV transformers, resulting from BPA Solicitation SSTR09, Large Power Transformers. Hsaio-Lan McGee...

  3. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    122818 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  4. BPA-2012-00862-FOIA Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract issued to Hyundai Heavy Industries on November 13, 2009, for Lot 2, 230kV transformers, to include unit pricing for each transformer rating available for purchase under...

  5. Microsoft Word - BPA-2013-01283-FResponse.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A data pull from a purchasing database for the following information: 1. Power Transformers 69kV and above (step up & step down) Key Attributes: High side Rated kV-Low Rated...

  6. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    121917 500 kV Spare Transformer Project Acquire 5 spares and relocate 2 existing transformers to be used as spares. The spares will be placed strategically across the system....

  7. BPA-2012-00862-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract issued to Hyundai Heavy Industries on November 13, 2009, for Lot 2, 230kV transformers, resulting from BPA Solicitation SSTR09, Large Power Transformers. This information...

  8. BPA-2011-00505-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 i f ( s c7' e F Dear Ms. Brennon: As in the past, we wish to obtain the cost or investment in the 500 kv transmission line systems in Montana. Pursuant to the Freedom of...

  9. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Substation - Additional 500kV Transformer This project will install a new transformer comprised of three single phase 476 MVA transformers at McNary Substation. The project also...

  10. BPA-2011-00505-FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agency about your request. You have requested the following: A copy of the cost or investment in the 500 kv transmission line systems in Montana: 1. Total investment in the...

  11. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SVC renovations and the Big Eddy-Knight 500 kV line project). The objectives of this investment are to: * Reduce the frequency of line switching during light load hours to minimize...

  12. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sustain Steel Program Defective Damper Replacements The bulk of the 500 kV main grid (4,870 miles) is composed of conductor bundles in each phase or pole position. Spacer dampers...

  13. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hungry Horse Station Service Replacement This project will replace the station service 2300V power distribution board and 13.8kV cables installed as original equipment (circa 1950)...

  14. EIS-0129: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Final Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-FEIS.pdf PDF icon ...

  15. Comments from the City of Alexandria in Support of the Comments...

    Broader source: Energy.gov (indexed) [DOE]

    transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the City of Alexandria in Support of the Comments ...

  16. Level 1 Accident Investigation Report of August 17, 2004, Fatal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    wire on the Grand Coulee-Bell 6 500-kV line between tower 842 and BPA's Bell Substation in Mead, Washington. (See Appendix 7, Site Map.) Level 1 Accident Investigation ...

  17. Department of Energy Offers Conditional Commitment for a Loan...

    Office of Environmental Management (EM)

    ON Line consists of a new 500 kilovolt (kV) AC transmission line that will run 235 miles from Ely, Nevada to just north of Las Vegas, with a new substation located at the northern ...

  18. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County. Additional information is available at https:www.bpa.govefwAnalysis...

  19. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line that would connect a new switchyard with the existing Witten Substation. ...

  20. A I K E N

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Together not only did we build the Duke Energy eGRID and the wind turbine FOR IMMEDIATE RELEASE Duke Energy 230KV High Voltage Substation. Photograph Courtesy of Duke Energy Media ...

  1. Bonneville Power Administration

    Broader source: Energy.gov (indexed) [DOE]

    138115-kilovolt (kV) Hooper Springs Substation that will be located near the city of ... north then east from the Hooper Springs Substation to a new BPA connection facility that ...

  2. EA-1383: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California

  3. EIS-0365: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    230,000-volt (230-kV) electric transmission lines across the U.S. border with Mexico. In addition, right-of-way grants were issued to each company by the Department of...

  4. EIS-0332: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    kV transmission line between Bonneville Power Administration's existing McNary and John Day substations. PDF icon DOEEIS-0332: Mitigation Action Plan for the McNary-John Day...

  5. Supplement Analyses (SA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site, Richland, Washington August 15, 2011 EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project August 4, 2011 EIS-0348-SA-03: Supplement...

  6. EIS-0399: Record of Decision (OE) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OE) EIS-0399: Record of Decision (OE) Montana Alberta Tie Ltd. 230-kV Transmission Line Project Department of Energy announces its decision to issue a Presidential permit to...

  7. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2005 EA-1551: Notice of Intent to Prepare an Environmental Assessment EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line March 4, 2005 EIS-0342: DOE Notice of...

  8. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised by State September 25, 2009 EIS-0399: Record of Decision (WAPA) Montana Alberta Tie Ltd. 230-kV Transmission Line Project September 15, 2009 EIS-0312: Record of...

  9. EIS-0399-SA-01: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -SA-01: Supplement Analysis EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project Proposed Action: Modification to relocate four segments of...

  10. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line January 11, 2008 EIS-0236-S4: DOE Notice of...

  11. EIS-0399: Record of Decision (WAPA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WAPA) EIS-0399: Record of Decision (WAPA) Montana Alberta Tie Ltd. 230-kV Transmission Line Project The Western Area Power Administration has decided to finance a portion of the...

  12. EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40–Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington

  13. Microsoft Word - DOE-ID-INL-13-006 R1-(INL-13-019 R1-redline...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two circuits of three-phase distribution lines will be ... to approximately pole 40E on the 138kV transmission line. ... non-road engines (small electrical generators), but are ...

  14. CX-003611: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer ReplacementCX(s) Applied: B1.3Date: 08/25/2010Location(s): King County, WashingtonOffice(s): Bonneville Power Administration

  15. CX-010686: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  16. Microsoft Word - HV-BPL Final Report to NETL.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... channels that control their electrical grid. ... Line (BPL) connection operating on the in-service, 0.77 mile, 69 kV transmission line ... on MV distribution lines, making ...

  17. EA-1853: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Perrin Ranch Wind submitted an interconnection request to Western in 2010 to interconnect the proposed project to the existing Moenkopi-Yavapai 500-kV transmission line. Western is...

  18. Energy Storage Systems 2012 Peer Review Presentations - Day 2...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor (1.52 MB) ESS 2012 Peer Review - Experimental Investigation of Silicon Carbide ...

  19. EA-1909: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    40 turbines, to Western's existing Archer-Sidney 115-kV Transmission Line in Kimball County, Nebraska. PDF icon EA-1909-FEA-2012.pdf More Documents & Publications EA-1909: Draft...

  20. APPLICATION OF A CATEGORICAL EXCLUSION

    Office of Environmental Management (EM)

    Electric Power (AEP) for the installation and maintenance of an overhead 7.2kv electrical power line from an existing AEP power pole located on U S Department of Energy...

  1. Annual Report to Congress on Federal Government Energy Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Structure CO F 161 kV Sw itch House COF Dry Fly Ash Eqpt Bldg BRF Pumping Station ... Bldg BFN Unit 1 & 2 Dsl.Gen. Bldg PAF Scrubber Control Bldg BFN Unit 3 Diesel Generator ...

  2. EA-1941: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Final EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission ...

  3. EA-1941: Finding of No Significant Impact (FONSI) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Finding of No Significant Impact for proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line. PDF icon ...

  4. Sandia National Laboratories: Other Facilities and Capabilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Facilities and Capabilities High Voltage Breakdown Testing We can perform high voltage standoff testing with DC and pulsed voltages. DC testing can be conducted up to 200 kV. Pulsed voltage from 140 - 400 kV can be attained, with a typical lightning waveform - unipolar, 1.2 microsecond risetime and 50 microsecond pulse width. Testing is conducted in humidity-controlled chambers. Breakdown voltage and current can be measured. Small TEM Cell We have a small transverse electromagnetic (TEM)

  5. EA-1843: Imperial Solar Energy Center West, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Environmental Impact Report / Environmental Assessment (EIR/EA), prepared by Bureau of Land Management, evaluates the potential environmental impacts from the CSOLAR Development, LLC, right-of-way (ROW) application to construct, operate, and maintain a 230-kV transmission line. The electric generating facility would connect to the Imperial Valley Substation via a 230-kV transmission line. DOE is a cooperating agency and plans to adopt the EA.

  6. U.S. Energy Information Administration (EIA) - Map

    Gasoline and Diesel Fuel Update (EIA)

    Isaac Overview Data Petroleum and Other Liquids Natural Gas Refinery Capacity Natural Gas Processing Plants Map Uncheck or check an item to hide or show it in the map. Electric Power Plants (>=100 MW) Coal Hydroelectric Natural Gas Nuclear Petroleum Wood Wind Other Electricity Transmission Lines (>=345kV) Electricity Transmission Lines (<345kV) LNG terminals Natural Gas Market Centers (Hubs) Natural Gas Processing Plants Natural Gas Interstate, Intrastate, and Gathering Pipelines Oil

  7. U.S. Energy Information Administration (EIA) - Map

    Gasoline and Diesel Fuel Update (EIA)

    Uncheck or check an item to hide or show it in the map. Electric Power Plants (>=100 MW) Coal Hydroelectric Natural Gas Nuclear Petroleum Wood Wind Other Electricity Transmission Lines (>=345kV) Electricity Transmission Lines (<345kV) LNG terminals Natural Gas Market Centers (Hubs) Natural Gas Processing Plants Natural Gas Interstate, Intrastate, and Gathering Pipelines Oil Import Site & Oil Seaports Petroleum Refineries Heating Oil Reserve Site Show All Hide All Map Sources:

  8. Tribal TG Telecon 7_11_07

    Office of Environmental Management (EM)

    Y TRIBAL OWNERSHIP & CAPTURING THE GOVERNMENT TAX BASE - 3 PROJECTS CAMPO BAND OF KUMEYAAY Southeast San Diego County 24 square miles Population: 365 GENERAL PARAMETERS * 66kV line on Reservation with substation * 500 kV line with substation 15 miles from Reservation * Interstate highway through Reservation * Railway line through Reservation * 3 MM in-County customer base * Average 30% capacity factor on ridge tops THREE APPROACHES * Kumeyaay Wind * 50 MW passive lease * 25 year lease *

  9. Tribal Ownership & Capturing the Government Tax Base - 3 Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Y TRIBAL OWNERSHIP & CAPTURING THE GOVERNMENT TAX BASE - 3 PROJECTS CAMPO BAND OF KUMEYAAY Southeast San Diego County 24 square miles Population: 365 GENERAL PARAMETERS * 66kV line on Reservation with substation * 500 kV line with substation 15 miles from Reservation * Interstate highway through Reservation * Railway line through Reservation * 3 MM in-County customer base * Average 30% capacity factor on ridge tops THREE APPROACHES * Kumeyaay Wind * 50 MW passive lease * 25 year lease *

  10. CX-007147: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Categorical Exclusion Determination CX-007147: Categorical Exclusion Determination Flagstaff Substation Breaker Replacement & Control Cable Addition CX(s) Applied: B2.5 Date: 02/18/2011 Location(s): Coconino County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on removing four existing 345-kilovolt (kV) circuit breakers and installing four new 362-kV circuit breakers as well as adding new power and control cables in existing cable trenches

  11. EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

  12. Dependence of the Electron Beam Energy and Types of Surface to Determine EBSD Indexing Reliability in Yttria-Stabilized Zirconia

    SciTech Connect (OSTI)

    Saraf, Laxmikant V.

    2012-04-01

    Electron backscatter diffraction (EBSD) is a powerful technique for the surface microstructure analysis. EBSD analysis of cubic yttria-stabilized zirconia (YSZ) in two and three dimensions (2-D, 3-D) is demonstrated using sequential slicing from a focused ion beam (FIB) followed by EBSD mapping to represent 3-D reconstructed high density grain structure with random orientation. The statistics related to accuracy of EBSD band detection shows that probability of accurate grain orientation detection increased significantly when the electron beam energy is increased from 10 kV to 30 kV. As a result of better sampling with increased interaction volume, a disparity between local and average grain orientation angle also exhibited the dependence of the electron beam energy to determine the accuracy of grain orientation. To study the accuracy and quality of EBSD band detection as a function of surface roughness and over layer formation, rapid EBSD measurement tests are performed on (a) YSZ surfaces ion-polished at ion beam energies of 65 nA at 30 kV and 1 nA at 30 kV and (b) carbon coated versus uncoated YSZ surfaces. The EBSD results at both 10 kV and 30 kV electron beam energies indicate that EBSD band detection accuracy is negatively affected by surface roughness and amorphous over layer formation.

  13. DESIGN AND TEST OF AN INSTRUMENT FOR MEASURING MICROTHERMAL SEEING ON THE MAGDALENA RIDGE

    SciTech Connect (OSTI)

    Jorgensen, A. M.; Klinglesmith, D. A.; Speights, J.; Clements, A.; Patel, J.

    2009-05-15

    We have constructed and operated an automated instrument for measuring ground-level microthermal seeing at the Magdalena Ridge Observatory (MRO). The MRO is located at an altitude of 10500' in the Cibola National Forest in New Mexico, USA. It is the planned site for the MRO Optical Interferometer (MROI) planned for up to 10 collecting elements, each with a diameter of 1.4 m, and baselines eventually up to approximately 400 m. As part of the preparation for construction we deployed a system to characterize the ground-level seeing across the observatory site. The instrument is built largely of off-the-shelf components, with only the sensor head and power supply requiring electronic board assembly. Even in those cases the board architecture is very simple. The first proof-of-concept system was deployed for several weeks in the autumn of 2004, and has since undergone several iterations. The latest configuration operates entirely off batteries, incorporates wireless data acquisition, and is thus able to operate in an area with no shelter, power, or communications. In this paper we present the design of the instrument, and show initial data. The microthermal tower has four sensor pairs at heights from 0.8 to 4.41 m, significantly lower than other microthermal experiments, because of the need to characterize the seeing near the ground. We find significant variation in the contribution of this range of heights to the seeing, contributing up to 0.''3 of the seeing at some times and only 0.''02 at other times. The individual sensor power spectra have a slope in the range of 1.4--1.5, which is lower than the 1.67 slope predicted by Kolmogorov turbulence theory. We measure the well known effect of improved seeing immediately around sunset. While we find significant variation in the microthermal seeing, we did not find a pattern of corresponding variations in weather conditions, suggesting that a complicated set of factors control microthermal turbulence.

  14. In-patient to isocenter KERMA ratios in CT

    SciTech Connect (OSTI)

    Huda, Walter; Ogden, Kent M.; Lavallee, Robert L.; Roskopf, Marsha L.; Scalzetti, Ernest M.

    2011-10-15

    Purpose: To estimate in-patient KERMA for specific organs in computed tomography (CT) scanning using ratios to isocenter free-in-air KERMA obtained using a Rando phantom.Method: A CT scan of an anthropomorphic phantom results in an air KERMA K at a selected phantom location and air kerma K{sub CT} at the CT scanner isocenter when the scan is repeated in the absence of the phantom. The authors define the KERMA ratio (R{sub K}) as K/ K{sub CT}, which were experimentally determined in a Male Rando Phantom using lithium fluoride chips (TLD-100). R{sub K} values were obtained for a total of 400 individual point locations, as well as for 25 individual organs of interest in CT dosimetry. CT examinations of Rando were performed on a GE LightSpeed Ultra scanner operated at 80 kV, 120 kV, and 140 kV, as well as a Siemens Sensation 16 operated at 120 kV. Results: At 120 kV, median R{sub K} values for the GE and Siemens scanners were 0.60 and 0.64, respectively. The 10th percentile R{sub K} values ranged from 0.34 at 80 kV to 0.54 at 140 kV, and the 90th percentile R{sub K} values ranged from 0.64 at 80 kV to 0.78 at 140 kV. The average R{sub K} for the 25 Rando organs at 120 kV was 0.61 {+-} 0.08. Average R{sub K} values in the head, chest, and abdomen showed little variation. Relative to R{sub K} values in the head, chest, and abdomen obtained at 120 kV, R{sub K} values were about 12% lower in the pelvis and about 58% higher in the cervical spine region. Average R{sub K} values were about 6% higher on the Siemens Sensation 16 scanner than the GE LightSpeed Ultra. Reducing the x-ray tube voltage from 120 kV to 80 kV resulted in an average reduction in R{sub K} value of 34%, whereas increasing the x-ray tube voltage to 140 kV increased the average R{sub K} value by 9%. Conclusions: In-patient to isocenter relative KERMA values in Rando phantom can be used to estimate organ doses in similar sized adults undergoing CT examinations from easily measured air KERMA values at the

  15. Substation grounding programs. Volume 5, Applications manual

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S.

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  16. Substation grounding programs

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S. . Electric Power Lab.)

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  17. Sundance Energy Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2001-06-29

    Sundance Energy LLC (Sundance) has applied to the Western Area Power Administration (Western) to interconnect a planned generator facility to Western's transmission system in the vicinity of Coolidge, Arizona. Western's proposed action is to enter into an interconnection and construction agreement with Sundance for the requested interconnection. The proposed interconnection would integrate the power generated by the Sundance Energy Project (Project) into the regional transmission grid and would allow Sundance to supply its power to the competitive electric wholesale market. The proposed Project would be built on private lands southwest of Coolidge. The proposed Project would be a ''peaking power plant project'' which means it would provide energy when it is needed during peak demand periods in the region. The proposed Project would also be a ''merchant plant'' which means it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the energy generated by the power plant. Western, as a major transmission system owner, must generally provide access to its transmission system when requested by an eligible organization per existing policies, regulations and laws. The proposed Project would consist of the construction and operation of a generating facility; construction of a 14-mile pipeline to supply natural gas to the proposed Facility; a new 230-kV bay at an existing substation; a new double-circuit 230-kV transmission line; a new single-circuit 230-kV transmission line; an upgrade of a 115-kV line to 230-kV specifications; and an upgrade of an existing substation. Three alternatives would consist of different locations of the 230-kV transmission lines and would not involve upgrading the 115-kV line or the existing substation. The environmentally preferred alternative is Alternative 3, the power line routing that is furthest west.

  18. Development of extruded and molded straight joint for ultra high-voltage XLPE cable

    SciTech Connect (OSTI)

    Shimomura, T.; Ando, K.; Asahi, K.; Sugiyama, K.

    1986-01-01

    In Japan, 154-kV crosslinked polyethylene-insulated cables (XLPE) are already in use for long-distance tranmission lines, but 275-kV XLPE cables are used only for short-distance lines (without joints) on the premises of power-generation plants and substations. 275-kV XLPE cable is expected to be used for long-distance transmission lines in the near future because of its overall cost advantage. To respond to this need, a straight-through joint with the same reliability as the cable should be developed. Reliable joints should be formed and molded with the same curable PE compounds as the cable insulation. At present, 154-kV XLPE cables for long-distance transmission lines are usually constructed with the joint comprising XLPE insulation wrapped with curable PE tape and molded by heating. However, this taped molded joint has the disadvantages of troublesome tape handling. On the other hand, extruded molded joints are constructed by injecting curable melted PE into a mold with an extruder, eliminating contamination. The report describes the characteristics of the extruded and molded joint developed for 154, 275 and 500 kV class XLPE cables.

  19. Measurements of the asymmetric, dynamic sheath around a pulse biased sphere immersed in flowing metal plasma

    SciTech Connect (OSTI)

    Anders, Andre; Wu, Hongchen; Anders, Andre

    2008-06-13

    A long-probe technique was utilized to record the expansion and retreat of the dynamic sheath around a spherical substrate immersed in pulsed cathode arc metal plasma. Positively biased, long cylindrical probes were placed on the side and downstream of a negatively pulsed biased stainless steel sphere of 1" (25.4 mm) diameter. The amplitude and width of the negative high voltage pulses (HVP) were 2 kV, 5 kV, 10 kV, and 2 mu s, 4 mu s, 10 mu s, respectively. The variation of the probe (electron) current during the HVP is a direct measure for the sheath expansion and retreat. Maximum sheath sizes were determined for the different parameters of the HVP. The expected rarefaction zone behind the biased sphere (wake) due to the fast plasma flow was clearly established and quantified.

  20. Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    2006-10-25

    The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

  1. Study of a Station Blackout Event in the PWR Plant

    SciTech Connect (OSTI)

    Ching-Hui Wu; Tsu-Jen Lin; Tsu-Mu Kao [Institute of Nuclear Energy Research P.O. Box 3-3, Longtan, 32500, Taiwan (China)

    2002-07-01

    On March 18, 2001, a PWR nuclear power plant located in the Southern Taiwan occurred a Station Blackout (SBO) event. Monsoon seawater mist caused the instability of offsite power grids. High salt-contained mist caused offsite power supply to the nuclear power plant very unstable, and forced the plant to be shutdown. Around 24 hours later, when both units in the plant were shutdown, several inadequate high cycles of bus transfer between 345 kV and 161 kV startup transformers degraded the emergency 4.16 kV switchgears. Then, in the Train-A switchgear room of Unit 1 occurred a fire explosion, when the degraded switchgear was hot shorted at the in-coming 345 kV breaker. Inadequate configuration arrangement of the offsite power supply to the emergency 4.16 kV switchgears led to loss of offsite power (LOOP) events to both units in the plant. Both emergency diesel generators (EDG) of Unit 1 could not be in service in time, but those of Unit 2 were running well. The SBO event of Unit 1 lasted for about two hours till the fifth EDG (DG-5) was lined-up to the Train-B switchgear. This study investigated the scenario of the SBO event and evaluated a risk profile for the SBO period. Guidelines in the SBO event, suggested by probabilistic risk assessment (PRA) procedures were also reviewed. Many related topics such as the re-configuration of offsite power supply, the addition of isolation breakers of the emergency 4.16 kV switchgears, the betterment of DG-5 lineup design, and enhancement of the reliability of offsite power supply to the PWR plant, etc., will be in further studies. (authors)

  2. Next Update: October 2010

    U.S. Energy Information Administration (EIA) Indexed Site

    (Various) Country - with Total (T) for sub- regions NERC Region NERC Sub-region Type Operating (kV) Design (kV) Month Year From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrangement Present Ultimate Company Code Company Name Organizational Type US ERCOT - AC 121-150 138 245 5 2015 Allen Switch West Plano 3.5 OH 0 0 0 0 0 0 0 44372 ONCOR I US ERCOT - AC 121-150 138 320 6 2012 Barney Davis Laguna 4.2 OH 0 0 0 0 0 0 0 3278 AEP/TCC I US ERCOT - AC

  3. EA-1844: Imperial Solar Energy Center South, California

    Broader source: Energy.gov [DOE]

    This Environmental Impact Report / Environmental Assessment (EIR/EA), prepared by Bureau of Land Management, evaluates the potential environmental impacts from two CSOLAR Development, LLC, right-of-way (ROW) applications to construct, operate, and maintain a 230-kV transmission line and a road ROW across Federal lands along the Westside Main Canal. The electric generating facility would connect to the Imperial Valley Substation via a 230-kV transmission line and access to the facility would be along the Westside Main Canal. DOE is a cooperating agency. NOTE: DOE's plans to adopt the EA are cancelled because the applicant withdrew from the program.

  4. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume II

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O Agricultural Impact Mitigation Plan (AIMP) Example ITCM Minnesota - Iowa 345 kV Transmission Line Project: Final Environmental Impact Statement Appendix O Agricultural Impact Mitigation Plan O-1 ITC Midwest LLC Agricultural Impact Mitigation Plan Minnesota - Iowa 345 kV Transmission Project and Associated Facilities in Jackson, Martin, and Faribault Counties Docket Nos. ET6675/CN-12-1053 & ET6675/TL-12-1337 April 29, 2014 ITC Midwest's DEIS Comment Letter E X A M P L E ITCM Minnesota -

  5. February 16, 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    [mailto:swalexander@pepco.com] Sent: Thursday, February 15, 2007 11:45 AM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. To Whom It May Concern: On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage

  6. Microsoft PowerPoint - Subregion 3 Presentation 5-12-09.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Southwest Power Pool Sub-Regional Planning Meeting Sub-Regional Area 3 David Sargent May 12, 2009 Southwestern Power Administration Slide 2 Southwestern Power Administration Slide 3 Five Year Construction Plan 2009 Bull Shoals Dam Bus Upgrade - from 600 to 1200/2000 amps The bus is a limiting element for the line going from Bull Shoals toward Harrison. New Madrid 161/69 kV Autotransformer Replacement New Madrid-Malden-Piggott-Kennett 69 kV Line Rebuild - 55 miles of line collapsed during an ice

  7. Silicon Carbide JFET Switch

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5kV Enhancement-Model Silicon Carbide JFET Switch The novel 6.5kV SiC device and power module represent the world's highest-voltage module based on reliable, normally-off SiC JFETs. It reduces switching losses over that of Si-IGBTs by a factor of 20 and exhibits the fastest turn- on and turn-off of any 6.5kV-rated power module. Another major aspect of what makes this product unique is USCi's development and manufacturing approach. JFETs are simple transistor switches, yet for SiC materials, a

  8. Nuclear Navy United States Atomic Energy Commission Historical Advisory

    Energy Savers [EERE]

    Department of Energy In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station (13.36 KB) More Documents

  9. Price hub","Trade date","Delivery start date","Delivery

    U.S. Energy Information Administration (EIA) Indexed Site

    "application/vnd.ms-excel","application/vnd.ms-excel",55,53,54.29166667,12.54,24000,29,15 "ERCOT North 345KV Peak","application/vnd.ms-excel","application/vnd.ms-excel","application/vnd.ms-excel",41.5,40.5,41.0483871,-13.24,24800,29,15 "ERCOT North 345KV Peak","application/vnd.ms-excel","application/vnd.ms-excel","application/vnd.ms-excel",41.5,40.75,41.16666667,0.12,7200,9,11 "ERCOT North

  10. Electric Power Annual 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    Capacity Conductor Characteristics Data Year Country NERC Region NERC Sub- region Type Operating (kV) Design (kV) Rating (MVa) Month Year From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrange- ment Present Ultimate Company Code Company Name Organizational Type Ownership (Percent) Project Name Level of Certainty Primary Driver 1 Primary Driver 2 2011 US TRE ERCOT AC 300-399 5 2018 DeCordova Benbrook 27 OH 44372 Delivery 100 00TPIT0004

  11. Microsoft Word - Cover Page - Exhibit 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Northern Pass Project Chart of Proposed Structure Heights 1 3 3 6 21 29 40 22 20 12 18 10 14 14 29 26 26 14 7 4 0 1 0 0 0 3 29 66 148 244 291 190 121 57 45 24 17 7 6 1 0 0 0 0 0 50 100 150 200 250 300 350 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 Structure Quantity Structure Height EXHIBIT 5 Project Structure Height Breakdown - HVDC & 345-kV HVDC Structures 345-kV Structures 27-JUN-2013

  12. Microsoft Word - Document1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    kksullivan@pepco.com <kksullivan@pepco.com> To: #DOE_Notification@pepco.com<#DOE_Notification@pepco.com Sent: Thu May 31 16:08:31 2007 Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: One of the two new 230kV transmission lines - xxxxx into Potomac River substation is scheduled to be energized on Thursday May 31, 2007. This circuit will not carry load for the first (2) days after being energized for test purposes. On Saturday June

  13. Microsoft Word - Document1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sent: Friday, June 22, 2007 1:07 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station In accordance with DOE Order No. 202-07-02, Pepco is required to provide notification of any and all 230kV planned and unplanned outages at Potomac River Generating Station. To Whom It May Concern: On Sunday June 24, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23107 high voltage circuit between Palmers Corner

  14. Superconducting accelerator cavity with a heat affected zone having a higher RRR

    DOE Patents [OSTI]

    Brawley, John; Phillips, H. Lawrence

    2000-01-01

    An improved method for welding accelerator cavities without the need for time consuming and expensive faying surface treatments comprising electron beam welding such cavities in a vacuum welding chamber within a vacuum envelope and using the following welding parameters: a beam voltage of between about 45 KV and 55 KV; a beam current between about 38 ma and 47 ma; a weld speed of about 15 cm/min; and a sharp focus and a rhombic raster of between about 9 KHz and 10 Khz. A welded cavity made according to the method of the present invention is also described.

  15. CX-007143: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will

  16. Breaking New Ground in Membrane Protein Research | Argonne Leadership

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computing Facility Atomic model for the simulation of the KvAP channel in a lipid membrane. Atomic model for the simulation of the KvAP channel in a lipid membrane. The model represents the channel in an open activated state as determined by EPR experiments from the laboratory of Eduardo Perozo (The University of Chicago). The atomic model comprises 964 amino acids, 302 lipid molecules, 12,046 water molecules, and 53 K+ and Cl- ion pairs. In total, there are 112,798 atoms in the system. The

  17. CX-007131: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation,

  18. CX-007148: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    48: Categorical Exclusion Determination CX-007148: Categorical Exclusion Determination Gila Substation Electrical Equipment Replacement CX(s) Applied: B4.6 Date: 05/03/2011 Location(s): Yuma County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace a 34.5-kilovolt (kV) circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables

  19. CX-011831: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

  20. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.