Powered by Deep Web Technologies
Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Proposed Action  

E-Print Network (OSTI)

Plan and made determinations of “may effect, likely to adversely affect ” for the Pitcher's thistle, Kirtland's warbler, bald eagle, piping plover, Karner blue butterfly, and Indiana bat. The Forest made a determination of “may effect, not likely to adversely affect ” for designated piping plover critical habitat. September 16, 2005: The Service responded to the Forest’s request for formal consultation, indicating that the information received in the BA constituted a complete initiation package. September – December 2005: Jessica Hogrefe (USFWS) worked with Forest biologists via email and telephone to discuss the proposed Plan and effects to listed species.

U. S. Fish; Wildlife Service

2006-01-01T23:59:59.000Z

2

Environmental Assessment - Proposed Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

3

Description of Proposed Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

4

Microsoft Word - TurtleFlats_CX  

Office of Environmental Management (EM)

Project Manager - KEWM-4 Proposed Action: Turtle Flats Property Acquisition Funding Fish and Wildlife Project No.: 2011-003-00, BPA-007521 Categorical Exclusion Applied (from...

5

Microsoft Word - North Shore WMA CX w checklist.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manager - KEWM-4 Proposed Action: North Shore Wildlife Management Area property funding Fish and Wildlife Project No. and Contract No.: 2008-800-00, BPA-007509 Categorical...

6

Microsoft Word - ThurstonHills_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dorie Welch Project Manager - KEWM-4 Proposed Action: Thurston Hills property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from...

7

Microsoft Word - CoyoteCreekNE_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Manager - KEWM-4 Proposed Action: Coyote Creek Property Acquisition Funding Fish and Wildlife Project No.: 2011-003-00, Contract BPA-007521 Categorical Exclusion...

8

Riverland expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

9

Proposed Changes to Emergency Action Levels  

E-Print Network (OSTI)

Reference (a) provided proposed changes to Vermont Yankee's (VY's) Emergency Action Levels (EALs). This letter provides additional information requested by USNRC staff during a telecon held on

Vermont Yankee; Gautam Sen; Richard J. Conte; Emergency Preparedness; Safeguards Branch; Division Of Reactor

10

N Springs expedited response action proposal  

SciTech Connect

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

11

Chapter 2 - Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES The WIPP facility, in addition to serving its primary mission as a TRU waste disposal site, needs to perform a variety of actinide chemistry experiments to (1) support WIPP's recertification efforts, (2) address scientific questions important to WIPP, (3) improve TRU waste characterization techniques, and (4) improve DOE's understanding of how the waste interacts with the natural environment in order to better understand waste isolation performance. In the past, WIPP-related actinide chemistry experiments have taken place at DOE laboratory facilities at other DOE sites such as LANL. However, due to reductions in travel budgets and additional security requirements being imposed on DOE weapons

12

Chapter 4 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

need for the project and achieve the project's purposes (see Section 1.3, Purposes). BPA developed four action alternatives from combinations of the route segments and...

13

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

14

ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE  

Office of Legacy Management (LM)

ACTION DESCRIPTION MEMORANDUM ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 1 Background and Need for Action ..................... 2 Proposed Remedial Action ........................ 3 Potential Issues ................... ......... 4 Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 6 Tables. ............ .................. 7 References ................... ............ 8

15

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

can be regenerated electrically for use in future high efficiency electric vehicle (EV) heat pumps. Proposed work consists of indoor laboratory-based research and development,...

16

4.0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES 0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES This chapter evaluates the environmental consequences of the proposed action (Section 4.1) and of the alternatives (Section 4.2) . The analysis focuses primarily on impacts associated with routine operation of the glass melter. In some instances (such as human health) , additional analysis is provided for accident conditions. 4.1 THE PROPOSED ACTION The proposed action was evaluated to determine the potential impacts of a number of environmental components, including air quality, surface water quality, and biological resources, as well as the potential effects to human health and safety. The potential impacts to these receptors are evaluated in the following subsections. No impact pathways were identified for land use, socioeconomics, or groundwater resources.

17

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND 4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES . This section describes potential environmental impacts of the proposed action and alternatives. If the proposed action is implemented, activities would be limited to existing facilities. A WERF modification would be required to allow for injection of an atomized aqueous waste stream into the incinerator lower chamber. The installation would be performed within the WERF incinerator/stabilization building and may use an existing incinerator access port. Installation work would be similar to many routine maintenance and modification actions at WERF. A detailed analysis of potential impacts from processing INEL-generated LL W at commercial facilities is not presented in this EA because specific commercial facilities and processes have not

18

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'u ", lt~Fs::::N 'u ", lt~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to construct a maintenance garage for heavy vehicles and equipment at the Springfield, Missouri facility. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 7,2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.15- Siting, construction or modification of support structures within or contiguous to an already developed area. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the

19

Management of corrective action wastes pursuant to proposed Subpart S  

SciTech Connect

Under Section 3004(u) of the Resource Conservation and Recovery Act (RCRA), owners/operators of permitted or interim status treatment, storage, and disposal facilities (TSDFs) are required to perform corrective action to address releases of hazardous waste or hazardous constituents from solid waste management units (SWMUs). On July 27, 1990, the Environmental Protection Agency (EPA) proposed specific corrective action requirements under Part 264, Subpart S of Title 40 of the code of Federal Regulations (CFR). One portion of this proposed rule, addressing requirements applicable to corrective action management units (CAMUs) and temporary units (TUs), was finalized on February 16, 1993 (58 FR 8658 et seq.). (CAMUs and TUs are RCRA waste management units that are specifically designated for the management of corrective action wastes). Portions of the proposed Subpart S rule that address processes for the investigation and cleanup of releases to environmental media have not yet been finalized. EPA and authorized State agencies, however, are currently using the investigation and cleanup procedures of the proposed rule as a framework for implementation of RCRA`s corrective action requirements. The performance of corrective action cleanup activities generates wastes that have to be characterized and managed in accordance with applicable RCRA requirements. This Information Brief describes these requirements. It is one of a series of information Briefs on RCRA Corrective Action.

Not Available

1995-02-01T23:59:59.000Z

20

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

proposes to add additional shop and office space onto two existing facilities proposes to add additional shop and office space onto two existing facilities located at the Jonesboro, Arkansas Maintenance Facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: May 09, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0 , Part B1 .15- Siting, construction or modification, and operation of support buildings and structures within or contiguous to an already developed area . REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class,

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Property:NEPA Proposed Action | Open Energy Information  

Open Energy Info (EERE)

Proposed Action Proposed Action Jump to: navigation, search Property Name NEPA Proposed Action Property Type Text Pages using the property "NEPA Proposed Action" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + NGP is proposing a geothermal development project which includes the construction and operation of power generation facilities, geothermal fluid production and injection well pads and wells, access roads, geothermal fluid pipelines, groundwater production wells, an electrical transmission line and switching station, and support facilities. NGP submitted an application (N-82701) and Plan of Development (PoD) to the BLM Winnemucca Field Office (WFO), for approval of a right-of-way (ROW) for those portions of the transmission line located on public lands managed by the BLM. SPPCo submitted an application (N-83479) to the BLM WFO for approval of a ROW for the electrical switching station to be built at the point of interconnection of the NGP transmission line with the existing SPPCo transmission line. An Operations Plan was submitted for approval to drill and test geothermal wells proposed on public land (within federal geothermal lease NVN-58196) which would be used for the project. A Utilization Plan was submitted for approval of utilization facilities proposed on public land to be used for the project. Geothermal Drilling Permits (GDPs) will be submitted for downhole casing and cementing engineering approval for each well as the project progresses.

22

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

install pole-mounted safety light(s) at the Gore, Oklahoma install pole-mounted safety light(s) at the Gore, Oklahoma substation facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: September 1, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0, Part B2.3- Installation of equipment for personnel safety and health. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A& B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the proposal must riot: (a.) Threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, including DOE and/or Executive Orders;

23

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Power Administration and the system of Entergy in Carroll County, Arkansas. The interconnection would require Entergy to construct a new switching station at the interconnection site in addition to an approximately 5 mile length of transmission line. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: April 11,2011 NUMBERS AND TIT!-ES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.12- Construction of electric powerlines approximately 10 miles in length or less, not integrating major new sources. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes

24

Microsoft Word - Updated Proposed Action 2004 SA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2004 December 27, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-01) Sarah McNary Senior Policy Advisor Proposed Action: Updated Proposed Action (UPA) for the FCRPS Biological Opinion Remand Location: The action area of the UPA, including areas where the UPA directly or indirectly affects listed salmonids consists of the following areas: * The mainstem Columbia River, including and downstream of Libby and Hungry Horse dams and reservoirs; the Snake River below the confluence with the Salmon River; and the Clearwater River below Dworshak reservoir and dam, down to and including the Columbia River estuary and plume. * The estuary and plume, which includes the area immediately off the mouth of the Columbia

25

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'IU "~I :~~~r;::::N 'IU "~I :~~~r;::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to perform aerial saw tree trimming activities along select portions of transmission line rights-of-ways located in eastern Oklahoma during the early winter of 2011. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 10, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.3- Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed.

26

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

NLE Websites -- All DOE Office Websites (Extended Search)

CATEGORICAL EXCLUSION (CX) DETERMINATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of

27

CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Zi~Fs::::N Zi~Fs::::N CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell- Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart D, Part B4.9- Grant or denial of requests for multiple use of transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and

28

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~Fs::::N ~~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration performed emergency construction activities to repair a levee, stabilize a bank, and complete drainage improvements as a result of damage incurred during recent heavy rains at the Jonesboro Maintenance Office and adjacent substation facility located in Craighead County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart 0 , Part B 2.5- Safety and environmental improvements of a facility, including replacement and upgrade of facility components, that do not result in a significant change in the

29

Categorical Exclusion (CX) Determination Proposed Action: Havre Substation, Stage 03.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Havre Substation, Stage 03. Havre Substation, Stage 03. Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the Havre Substation approximately 150 ft to the north to accommodate a new delivery service from the newly built Herron Substation by Hill County. The expansion also converts the existing 115-kV single bus into a ring bus which will improve reliability. Western is also expanding the yard to the east to accommodate the replacement of the existing control building and control boards. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.11: Construction of electric power substations .. . or modification of existing substations and support facilities . Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

30

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Southwestern) proposes to replace the shield wire, fiber-optic cable, (Southwestern) proposes to replace the shield wire, fiber-optic cable, conductor, structures, and all associated hardware on the Idalia to Asherville 161 kV, 22 mile transmission line located in Butler and Stoddard County, Missouri. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: October 13,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including , but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors,

31

Cleanup Actions Proposed for g-2, BLIP, and Former Underground  

E-Print Network (OSTI)

: Supporting Documentation for the Proposed Plan,AOC 12 and AOC 16K, and the BNL g-2 Source Area andTritium Plume ­ AOC 16T Focused Feasibility Study.The public is also invited to provide comments on them to DOE

32

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Oklahoma, and Missouri communication tower facilities to facilitate the spectrum relocation of Federal communications systems in conjunction with the Commercial Spectrum Enhancement Act (CSEA, Title II of P.L. 108-494). Communication tower facility modifications and construction activities include 13 tower replacements, 16 tower removals, and 6 communication site dispositions. The 35 tower project locations, identified by state, include: ~ Arkansas- Hardy, Melbourne, Paragould, Piggott, Bethel, Bull Shoals, Norfork, Piggott, Poteau Mountain, Decatur, Sulphur Rock, Van Buren, Winesburg, and Humphrey ~ Oklahoma- Broken Bow Project Office, Broken Bow Powerhouse, Gore Substation, Lamar, Weleetka,

33

Expedited response action proposal for 316-5 process trenches  

SciTech Connect

A summary of the evaluation of remedial alternatives for the 300 Area Process Trench sediment removal at Hanford is presented. Based on the preliminary technology screening, screening factors, and selection criteria the preferred alternative for the 300 Area Process Trench is to remove and interim stabilize the sediments within the fenced area of the process trenches. This alternative involves proven technologies that are applied easily at this mixed waste site. This alternative removes and isolates contaminated sediments from the active portion of the trenches allowing continued used of the trenches until an inspection and treatment facility is constructed. The alternative does not incorporate any materials or actions that preclude consideration of a technology for final remediation of the operable unit. The estimated initial and annual costs would enable this alternative to be implemented under the guidelines for an EPA- funded ERA ($2 million). Implementation of the alternative can be accomplished with trained personnel using familiar procedures to provide a safe operation that accomplishes the objective for removing a potential source of contamination, thereby reducing potential environmental threat to groundwater. 18 refs., 5 figs., 9 tabs.

Not Available

1991-07-01T23:59:59.000Z

34

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

obtain an easement for an existing access road obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of the transferred structures and equipment, for residential, commercial, or industrial uses. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B):

35

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

385: Notice of Proposed Floodplain and Wetland Actions 385: Notice of Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

36

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Floodplain and Wetland Actions Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

37

Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nergy nergy Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories - Improved Power System Operations Using Advanced Stochastic Optimization Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): New Mexico, Iowa, Massachusetts, Washington, and California Proposed Action Description: Funding will support development of an integrated probabilistic decision-making software that can account for uncertain conditions that affect renewable energy sources to ensure reliable and efficient use of power system assets and enforce AC power flow constraints. Proposed work consists of (1) developing a two-stage optimized algorithm for the stochastic unit commitment and economic dispatch and pricing

38

RCRA corrective action definitions under Subpart F and proposed Subpart S. RCRA Information Brief  

SciTech Connect

If EPA or the authorized State determines there has been a release of a hazardous waste or hazardous waste constituent at an interim status facility, RCRA Section 3008(h)(1) authorizes EPA or the authorized State to issue an administrative order requiring corrective action or other measures. There are no regulations specifically addressing corrective action orders under Subpart F. However, while an interim status facility is seeking a RCRA permit, the facility is required by 40 CFR 265 Subpart F to monitor ground water and report the results of this monitoring program to the regulatory agency. If a release of a hazardous waste or hazardous waste constituent occurs, the facility may be issued a RCRA Section 3008(h) Order to conduct corrective action. While the proposed Subpart S regulations apply specifically to SWMUs at permitted TSDFs, EPA intends to use similar corrective action requirements at interim status facilities where there has been a release of a hazardous waste or hazardous waste constituent. The specific requirements for corrective action at an interim status facility will be specified in a RCRA Section 3008(h) Order. Alternatively, EPA may compel corrective action under proposed Subpart S through a permit Schedule of Compliance, especially if the permit is expected to be issued in the near term. This information Brief discusses the terminology used in the two corrective action programs and discusses both the proposed Subpart S rule and the final CAMU and TU rule.

Not Available

1994-03-01T23:59:59.000Z

39

Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rtm nt n rgy rtm nt n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station - Robust Adaptive Topology Control (RATC) Program or Pield Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Texas, Arizona, California, New Jersey, and Tennessee. Proposed Action Description: Funding will support development an algorithmic Topology Control software to enable real-time, automated control over the transmissions lines within the electricity grid during unexpected power supply interruptions caused by intermittent availability of renewable generation sources, and cascading network failures due to extreme operating conditions or malicious attacks. Proposed work consists of (1) developing a fast, adaptive topology control algorithm to identify actions that will mitigate effects of unexpected

40

Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rgy rgy ·Submitby£-mail Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. - Dual Bi-Directional Silicon IGBTs Modules Enables Breakthrough PV Inverter Using Current-Modulation Topology Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCitY/County/State): California, New York, Virginia, Texas Proposed Action Description: Funding will support development of a low-cost, high-efficiency 100 kW power inverter to connect photovoltaic (PV) solar panels to the grid, using revolutionary bi-directiona linsulated gate bipolar transistor (BD-IGBT) switches and dual chip modules. Proposed work consists of indoor laboratory-based research and development (R&D) and semiconductor fabrication, including (1) device

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment of n rgy partment of n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research - Nanoclay-reinforced Ethylene-Propylene-Rubber for Low Cost HVDC Cabling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) (City/County/State): Niskayuna, NY Proposed Action Description: Funding will support development of a low cost, extrudable, nanoclay-reinforced ethylene-propylene-rubber (EPR) for making high voltage direct current (HVDC) cable. Proposed work will consist of (1) indoor, laboratory-based synthesis, characterization, and testing of nanoclay-reinforced EPR and (2) computer- based modeling of the performance characteristics and production cost of the nanoclay-reinforced EPR HVDC cable at full scale.

42

Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partme t nerg partme t nerg Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory - Reversible Metal Hydride Thermal Storage for High Temeprative Power Generation Systems Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah and Washington Proposed Action Description: Funding will support development of a novel, metal hydride-based thermal energy storage (TES) system for use with concentrated solar power or nuclear power generating systems. Proposed work consists of indoor laboratory-based research and development, including (1) materials synthesis, characterization, and testing to develop and optimize reversible metal hydride materials, (2) design and fabrication of a bench-scale 3kWh prototype TES unit, and (3) testing,

43

Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rg rg Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center - Thermal Storage Using Hybrid Vapor Compression Adsorption System Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): Connecticut, Michigan Proposed Action Description: Funding will support development of an advanced climate control system for plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) utilizing a hybrid thermal battery that employs a unique approach of adsorbing refrigerant on a metal salt. Proposed work consists of indoor laboratory-based research and development and office-based engineering analysis, including (1) synthesis, characterization, and testing of metal salts and refrigerant fluids for use in the thermal battery system, (2) computer-based design and

44

Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'Department of Energy 'Department of Energy Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) - Chilled Natural Gas for At-Home Refueling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Troy, NY; Columbia, MO Proposed Action Description: Funding will support efforts to develop a compressor technology for at-home refueling of natural gas vehicles. Proposed work will consist of: (1) development, synthesis, and testing of small quantities of adsorbent material at a dedicated laboratory facility on the University of Missouri campus in Columbia, MO; (2) design, fabrication (or procurement), and testing of compressor system components, including a cryocooler and an accumulator, at Chart Industries, Inc.'s commercial development and assembly site in Troy, NY; and (3) assembly

45

Categorical Exclusion (CX) Determination Proposed Action: Expansion of O'Fallon Creek Substation Yard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expansion of O'Fallon Creek Substation Yard Expansion of O'Fallon Creek Substation Yard Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the current yard to accommodate an additional bay for a dedicated electrical feed to a future oil pumping station that will be part of the Keystone XL project. Number and Title of Categorical Exclusions Being Applied: 10 CFR 10210410 Subpmi D, Appendix B, B4.11: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with the Regulatory Requirements for the National Environmental Policy Act at 10 CFR 1021AI0(b), require the following determinations be made in order for a proposed action to be categorically

46

Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment n rgy partment n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): California and New York Proposed Action Description: Funding will support development a highly distributed Demand Response Optimization and Management System for Real-time (DROMS-RT) power flow control software to support large scale integration of distributed renewable generation sources into the electricity grid. Proposed work consists of (1) developing a web-based software platform to enable full DROMS-RT functionality; (2) developing standards for

47

Categorical Exclusion Determination Form Proposed Action Title: (0473-1543) Georgia Tech Research Corporation-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1543) Georgia Tech Research Corporation- 3-1543) Georgia Tech Research Corporation- Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-Reliable Green Electricity Internetworks Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Georgia Proposed Action Description: Funding will support development of an internet-like software architecture capable of independently controlling and coordinating distributed energy sources generated by "prosumers," such as wind and solar power, to improve the reliability, efficiency, flexibility, and communications within the electrical grid. Proposed work consists of (1) developing an independently networked inverter controller that incorporates Kuramoto oscillators to reduce required

48

Categorical Exclusion Determination Form Proposed Action Title: (0470-1541) Chromatin Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41) Chromatin Inc. - 41) Chromatin Inc. - Plant Based Sesquiterpene Biofuels Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Kansas, Kentucky, Illinois, Ohio Proposed Action Description: Funding will support development of genetically modified (GM) sweet sorghum (Sorghum bicolor) to produce increased levels of farnesene , a drop-in biofuel. Proposed work will consist of (1) transforming sweet sorghum with mini-chromosomes carrying limiting genes and metabolic pathway genes to increase farnesene synthesis; (2) evaluating and optimizing genes from plants, E. coli, and yeast (Saccharomyces cerevisiae) to improve enzymatic activity and specificity; (3) testing plasmid constructs and evaluating optimized genes in a model plant, guayule

49

Categorical Exclusion Determination Form Proposed Action Title: (0675-1511) Ford Motor Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11) Ford Motor Company - 11) Ford Motor Company - High Precision Tester for Automotive and Stationary Batteries Program or Field Office:Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Dearborn, MI; Albuquerque, NM; College Station, TX Proposed Action Description: Funding will support efforts to develop a high precision battery tester to measure key battery characteristics during charge/discharge cycles to improve the accuracy and precision of Columbic Efficiency and predicted life expectancy estimates. Proposed work will consist of: (1) development and validation of a low current battery tester that meets established performance objectives and (2) development and validation a high current battery tester that meets established performance objectives.

50

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance Appliance Standards Program The FY 2003 Priority- Setting Summary Report and Actions Proposed Date: August 22, 2002 Table of Contents i EXECUTIVE SUMMARY.............................................................................................. iv 1 Energy Conservation Program - Product Prioritization Process.......1-1 1.1 Background on Appliance Standards Program........................................... 1-1 1.2 DOE Authority to Add Products ................................................................ 1-2 1.2.1 Consumer Products .................................................................................... 1-3 1.2.2 Commercial Products................................................................................. 1-5 1.2.2.1 Products Regulated under EPCA Provisions Concerning Consumer

51

Categorical Exclusion Determination Form Proposed Action Title: (0473-1520) Michigan State Un  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1520) Michigan State Un 3-1520) Michigan State Un iversity - Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): East Lansing, MI Proposed Action Description: Funding will support the development of a transformer-less unified power flow controller (UPFC) that can efficiently and economically control distributed and intermittent power flow generated by wind and solar power sources through existing transmission lines. Proposed work will consist of indoor activities to (1) engage in a system-level simulation of the new UPFC with a real-time simulator; (2) design, develop , and electronically fabricate three prototype 15-kV/1.5-MVA transformer-less UPFCs; (3) construct a temporary, 15-kV mobile testing

52

Categorical Exclusion Determination Form Proposed Action Title: (0208-1695) Sustainable Energy Solutions LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

208-1695) Sustainable Energy Solutions LLC - 208-1695) Sustainable Energy Solutions LLC - Cryogenic Carbon Capture (Phase 2) Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah; Wyoming Proposed Action Description: Funding will support development of a cryogenic carbon capture (CCC) process for separating carbon dioxide from flue gas via desublimination of the flue gas and compression of the resulting solid and liquid products. Proposed work will consist of (1) design, fabrication/acquisition, and testing of components for the pilot-scale prototype CCC system; (2) integration of the components into a skid-mounted, pilot-scale prototype CCC system; and (3) testing of the skid-mounted, pilot-scale prototype CCC system using actual or simulated flue gas streams.

53

Categorical Exclusion Determination Form Proposed Action Title: (0675-1534) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34) GE Global Research - 34) GE Global Research - Control Enabling Solutions with Ultrathin Strain and Temperature Sensor System for Reduced Battery Life Cycle Cost Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Ann Arbor, MI; Dearborn, MI Proposed Action Description: Funding will support efforts to develop a a novel sensor system with supporting multi-physics models to increase battery cell lifetime and extend battery range for electric vehicle applications. Proposed work will consist of: (1) development and fabrication a novel multi-measurand sensor capable of measuring strain and temperature across multiple battery cells; (2) performance of strain and temperature testing and development and validation of multi-physics models; (3)

54

Categorical Exclusion Determination Form Proposed Action Title: (0473-1529) Charles River Associates International Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29) Charles River Associates International Inc. - 29) Charles River Associates International Inc. - Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Massachusetts, Pennsylvania, Washington Proposed Action Description: Funding will support development of Topology Control, an algorithmic and software technology framework that will improve the efficiency of the electrical grid by implementing appropriate short-term changes of transmission line status to manage transmission congestion and uncertainties associated with integration of renewable generation sources into the electricity grid. Proposed work consists of (1) developing and validating a large power system model that accurately simulates day-ahead and intra-day power

55

Categorical Exclusion Determination Form Proposed Action Title: (0474-1592) Satcon Technology Corp. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-1592) Satcon Technology Corp. - 4-1592) Satcon Technology Corp. - Agile Direct Grid Connect Medium Voltage 4.7-13.8kV Power Converter for PV Applications Utilizing Advanced Wide Band Gap Devices Program or Field Office:Advanced Research Projects Agency - Energy Location{s) (City/County/State): Massachusetts, New Mexico, North Carolina, Pennsylvania Proposed Action Description: Funding will support development of an early stage prototype of a solid-state power inverter capable of converting low-voltage input power generated by utility-scale solar farms to medium voltage AC output power for transmission to the electric grid, increasing energy yield and reducing equipment costs. Proposed work consists of indoor laboratory-based research and development (R&D) and device testing, including (1) design, fabrication, and

56

Categorical Exclusion Determination Form Proposed Action Title: (0675-1570) Washington University in St. Louis -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) Washington University in St. Louis - 0) Washington University in St. Louis - Optimal Operation and Management of Energy Storage Systems Based on Real-Time Predictive Modeling and Adaptive Battery Management Techniques Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): St. Louis, MO; Golden, CO Proposed Action Description: Funding will support efforts to develop a battery management system for electric vehicle batteries capable of accurately predicting a battery's charge and health in order to make control decisions that improve battery safety, charging rate, useful capacity, and battery lifetime. Proposed work will consist of: (1) development of baseline physics models for the battery management; (2) optimization of the baseline physics

57

Categorical Exclusion Determination Form Proposed Action Title: (0470-1532) Arcadia Biosciences, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32) Arcadia Biosciences, Inc. - 32) Arcadia Biosciences, Inc. - Vegetative Production of Oil in a C4 Crop Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Davis, CA Proposed Action Description: Funding will support development of genetically modified (GM) Setaria viridis (Setaria) that produces triacylglycerol (vegetable oil) in the tissues of I. the plant in place of starch. If the work performed under the award is successful, Arcadia will incorporate the gene combinations developed in _ Setaria into sorghum. Proposed work will consist of laboratory-based (1) genetic modification of E. coli to construct vectors for implementing oil production genes in Setaria; (2) genetic modification of Setaria to express gene combinations for three different pathways that are critical to oil synthesis; and (3)

58

Categorical Exclusion Determination Form Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97) Smart Wire Grid, Inc. - 97) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): California, Missouri, North Carolina, Georgia, Wash ington, Pennsylvania, and Tennessee Proposed Action Description: Funding will support development of a Smart Wire System Controller and an energy router software to enable distributed agents to coordinate with the control center, improve power flow control, and take advantage of unused capacity within the existing transmission system. In addition, the power controller will enable grid operators to optimize transmission assets to fully integrate variable renewable energy sources. Proposed work consists of (1) designing, developing, testing, and optimizing the Smart Wire System Controller to meet utility specifications; (2)

59

Categorical Exclusion Determination Form Proposed Action Title: (0674-1585) Xilectric, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

585) Xilectric, Inc. - 585) Xilectric, Inc. - Low Cost Transportation Batteries Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): University of Rhode Island (Kingston, RI); Electrosynthesis, Inc. (Lancaster, NY) Proposed Action Description: Submit by E-mail JI Funding will support efforts to develop a new class of low-cost rechargeable battery chemistries based on the Edison battery chemistry that have the potential to exceed energy densities of 400 Wh/kg and 600 Wh/L at a battery materials cost less than $50/kWh. These battery systems will be built from materials that are earth-abundant, environmentally friendly, and cheap with a cell architecture that is inexpensive to manufacture and electrode structures expected to have extremely long cycle life. Proposed work will consist of: (1) testing, thermodynamic characterization, and

60

Proposed Action Title: (0470-1517) Donald Danforth Plant Science Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(0470-1517) Donald Danforth Plant Science Center - (0470-1517) Donald Danforth Plant Science Center - Center for Enahnced Camelina Oil Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Michigan, Missouri, Montana, Nebraska, New Mexico Proposed Action Description: Funding will support development of genetically modified (GM) camelina that grows at an increased yield and produces more seed oil than wild- type camelina for use as a biofuel feedstock. Proposed work will consist of (1) genetically modifying camelina to improve carbon capturel assimilation and light utilization, and to redirect carbon flux towards seed oil synthesis, including synthesis of oleic acid; (2) fabricating and testing phenomics chambers used to analyze plant metabolism under varying conditions (e.g. humidity, temperature); (3) growing selected lines of non-GM, wild-type camelina in contained

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determination Form Proposed Action Title: (0675-1578) Robert Bosch LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8) Robert Bosch LLC - 8) Robert Bosch LLC - Advanced Battery Management System Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): Bosch RTC (Palo Alto, CA); Cobasys, LLC (Orion, MI); University of California - San Diego (San Diego, CA) Proposed Action Description: Funding will support efforts to develop an adaptive battery management system that controls battery charging and discharging so as to enable fuller, more efficient battery utilization . Proposed work will consist of: (1 ) development of real-time estimation and control strategies for estimating battery performance; (2) design , development, and fabrication of small-scale Lithium-ion battery cells with an electrochemical-based battery management system; and (3) conducting analytical modeling and testing to characterize and validate system performance.

62

Categorical Exclusion Determination Form Proposed Action Title: (0674-1610) TVN Systems, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610) TVN Systems, Inc. - 610) TVN Systems, Inc. - Hydrogen/Bromine Electrical Energy Storage System Program or Field Office :Advanced Research Projects Agency - Energy (ARPA-E) Submit by E-mail LocationCs) CCity/County/State): TVN Systems, Inc. (Lawrence, KS); Vanderbilt University (Nashville, TN); University of Kansas (Lawrence, KS) Proposed Action Description: Funding will support efforts to develop a cost-effective hydrogen-bromine flow battery that utilizes advanced membrane materials, unique catalysts, a novel shunt current protection system , and advanced cell and system designs. Proposed work will consist of: (1) synthesizing active and stable Rhodium-sulfer based electro-catalytic materials for hydrogen reactions; (2) fabricating and testing nanofiber composite membranes;

63

DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

64

Categorical Exclusion Determination Form Proposed Action Title: (0472-1518) Case Western Reserve University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18) Case Western Reserve University - 18) Case Western Reserve University - Transformation Enabled Nitride Magnets Absent Rare Earths Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Cleveland, OH Proposed Action Description: Funding will support the development of iron nitride (a"-Fe16(xx)N2) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Case Western Reserve University's application was selected for an initial 18- month period (Phase 1) of funding . The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

65

Categorical Exclusion Determination Form Proposed Action Title: (0472-1545) Dartmouth College -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45) Dartmouth College - 45) Dartmouth College - Nanocrystalline T-MnAI Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Hanover, NH Proposed Action Description: Funding will support the development of manganese-aluminum (T-MnAI) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Dartmouth College's application was selected for an initial 18- month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional H3-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

66

Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to detect them is to look for them using facilities as far underground as possible so that the Earth's surface layers filter out other cosmic particles and radiation. The first basic astrophysics-like experiments were begun at WIPP in 1993 by LANL scientists who used

67

Categorical Exclusion Determination Form Proposed Action Title: (0472-1537) Northeastern University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37) Northeastern University - 37) Northeastern University - Multiscale Development of L 10 Materials for Rare-Earth-Free Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): New York, Michigan, Massachusetts, and Nebraska. Proposed Action Description: Funding will support the development of an ultra-strong ferromagnetic magnet material with a tetragonal L 10 structure, that does not contain rare earth materials and is designed for use in clean energy technologies such as electric vehicle motors and wind turbine generators. Northeastern University's application was selected for an initial 18-month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated

68

Notice of Proposed Floodplain and Wetlands Actions (DOE/EIS-0385) (03/28/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

398 Federal Register 398 Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices conditions that could result in an accidental or unauthorized detonation of nuclear explosives. Comments are invited on: (a) Whether the extended collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques

69

Microsoft Word - LowerJocko_Acquisition_CX_final_081310.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Confederated Salish and Kootenai Tribes (CSKT) for purchase of the Lower Jocko River Property Fish and Wildlife Project No.: 2002-003-00, Contract # BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife

70

Integrating local action elements for action analysis  

Science Journals Connector (OSTI)

In this paper, we propose a framework for human action analysis from video footage. A video action sequence in our perspective is a dynamic structure of sparse local spatial-temporal patches termed action elements, so the problems of action analysis ... Keywords: Action classification, Action distance function, Action matching, Action retrieval, Generalized Hough Transform, Implicit Shape Model, Multi-dimensional density estimation, Sparse Bayesian classifier, Spatial temporal feature

Tuan Hue Thi; Li Cheng; Jian Zhang; Li Wang; Shinichi Satoh

2012-03-01T23:59:59.000Z

71

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

72

Microsoft Word - Coyote Creek CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2013 3, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to acquire a conservation easement over the 310-acre Coyote Creek property. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Veneta and West Eugene quadrangles, in Lane County, Oregon (near Eugene, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund The Nature Conservancy's (Conservancy) purchase of the Coyote Creek property, a 310-acre parcel of land located just west of the

73

Microsoft Word - 2012_Rapid_Lightening_Creek_Easement_CX_Rev2.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2012 24, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Virgil Lee Watts Project Manager - KEWM-4 Proposed Action: AMENDED Provision of funds to the Idaho Department of Fish and Game (IDFG) to purchase the Rapid Lightning Creek Property. Fish and Wildlife Project No.: 1992-061-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Location: Township 58 North, Range 1 West, Section 24 of Bonner County, Idaho Proposed by: Bonneville Power Administration (BPA) and IDFG Description of the Proposed Action: BPA proposes to provide funds to IDFG for a fee-simple title acquisition of an approximately 27-acre parcel of land adjacent to the Rapid Lightning and

74

Microsoft Word - Finely_NorthValley_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cecilia Brown Cecilia Brown Project Manager - KEWM-4 Proposed Action: Finely Creek and North Valley Creek property funding Fish and Wildlife Project No. and Contract No.: 2002-003-00, BPA-58888 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Finely Creek: Township 16 North, Range 20 West, Section 24; Missoula County, MT. North Valley Creek: Township 17 North, Range 20 West, Section 19; Lake County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the Confederated Salish and Kootenai Tribes (CSKT) for the purchase of 9 acres of property, referred to as the Finely Creek Property,

75

Microsoft Word - MtRichmond_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Mt. Richmond property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation, and wildlife management. Location: Fairdale and Yamhill quadrangles, in Yamhill County, Oregon (near Yamhill, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Yamhill Soil and Water Conservation District's (YSWCD) purchase of the Mt. Richmond property (Property), a 284.66-acre parcel of land located west of the City of Yamhill in Yamhill County Oregon.

76

Microsoft Word - FlightsEnd_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Flight's End property funding Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Saint Helens quadrangle, in Columbia County, Oregon (near Scapoose, Oregon) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Greenbelt Trust's purchase of the Flight's End property (Property), a 100-acre peninsula located at the north end of Sauvie Island in

77

Microsoft Word - RailroadIsland_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Railroad Island Property Funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Monroe Quadrangle, in Lane County, Oregon (near Junction City, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund The Mackenzie River Trust (the Trust) to acquire a 63-acre parcel that will be known as Railroad Island. The Trust will provide BPA a conservation easement over the entire 63-acre property that will prevent

78

Microsoft Word - SYF_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: South Yamhill property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation, and wildlife management. Location: Fairdale and Yamhill quadrangles, in Yamhill County, Oregon (near Yamhill, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund Duck Unlimited's (DU) purchase of the South Yamhill property (Property), a 91.23-acre parcel of land located northwest of Amity in Yamhill

79

Microsoft Word - Chahalpam_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2012 2, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Chahalpam Property Funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Stayton Quadrangle, in Marion County, Oregon (near Stayton, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to provide funds to Western Rivers Conservancy (WRC) to purchase the 338-acre Chahalpam property near Stayton in Marion County, Oregon for the purposes of fish habitat conservation. Western Rivers

80

Microsoft Word - LuckiamuteMeadows_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Luckiamute Meadows property funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Kings Valley quadrangle, in Benton County, Oregon (near Kings Valley, Oregon) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund the Greenbelt Trust's purchase of the Luckiamute Meadows property (Property), a 73.6-acre parcel of land located just east of Kings Valley

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft Word - Spring Creek Final Draft CX 7-15-2013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Spring Creek Property funding Fish and Wildlife Project No. and Contract No.: 2002-003-00, BPA-007168 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 17 North, Range 20 West, Section 26, Lake County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the Salish and Kootenai Tribes for the purchase of 10 acres of property, referred to as the Spring Creek Land Acqusition in Lake

82

Microsoft Word - RattlesnakeButte_CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dorie Welch Dorie Welch Project Manager - KEWM-4 Proposed Action: Rattlesnake Butte Property Funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Monroe Quadrangle, in Lane County, Oregon (near Junction City, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Nature Conservancy (the Conservancy) to acquire 47 acres of land adjacent to a 50-acre parcel to create a total 97-acre parcel that will be known as Rattlesnake Butte. The Conservancy will provide BPA a conservation easement over the entire 97-acre property that will prevent habitat conversion and

83

Microsoft Word - BHF_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Bald Hill Farms property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation, and wildlife management. Location: Corvallis quadrangle, in Benton County, Oregon (near Corvallis, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Greenbelt Land Trust's purchase of the Bald Hill Farms property (Property), a 483-acre parcel of land located just west of the City of

84

CX-008883.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Virgil Lee Watts Project Manager - KEWM-4 Proposed Action: Indian Creek Property Funding. Fish and Wildlife Project No.: 1992-061-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Location: Pend Oreille County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the Kalispel Tribe of Indians' (Kalispel Tribe) purchase of a 556-acre parcel of land in Pend Oreille County, Washington. The Kalispel Tribe would own and manage the land and BPA would be granted a perpetual

85

Microsoft Word - Kokanee Bend CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Kokanee Bend South Conservation Easement funding Fish and Wildlife Project No. and Contract No.: 2008-800-00, BPA-006863 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 30 North, Range 20 West, Section 30, Flathead County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA intends to fund Montana Fish, Wildlife, and Parks (MFWP) for the purchase of a conservation easement, on approximately 70 acres of property,

86

Microsoft Word - lemhi cottombeyeler cx.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joe DeHerrera Project Manager - KEWM-4 Proposed Action: Provision of funds to The Nature Conservancy (TNC) to purchase conservation easements on Cottom and Beyeler Properties Fish and Wildlife Project No.: 2008-601, Bonneville Power Administration (BPA) Contract #: 005420 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer of land/habitat preservation, wildlife management. Location: Lemhi County, Idaho Proposed by: BPA and the State of Idaho Description of the Proposed Action: BPA is currently working with the State of Idaho to fund TNC's acquisition of an approximately 2,354-acre conservation easement in Idaho's Upper

87

Microsoft Word - Squeque-CX_Lane.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cecilia Brown Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes (CSKT) for purchase of Squeque Lane property. Fish and Wildlife Project No.: 2002-003-00, Contract 49933 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 17 North, Range 20 West, Section Lake County, Montana. Proposed by: Bonneville Power Administration (BPA) and CSKT.

88

Microsoft Word - Tall_Pines_CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lee Watts Lee Watts Project Manager - KEWM-4 Proposed Action: Provision of funds to the Idaho Department of Fish and Game for purchase of the Tall Pines Property. Fish and Wildlife Project No.: 1992-061-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 51 North Range 3 West Section 2 and Township 52 North Range 3 West Section 35, in Kootenai County, Idaho. Parcel is located on the northeastern shore of Hayden

89

Microsoft Word - West Swan_Acquisition_CX_10212010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2010 21, 2010 REPLY TO ATTN OF: Bruce Hollen KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Funding the acquisition by the State of Montana of habitat in the West Swan Valley. Fish and Wildlife Project No.: 2008-800-00, Contract # BPA-45235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021) B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

90

Microsoft Word - CX_PerryCreek_4.29.11.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife and Parks for purchase of the Perry Creek Property. Fish and Wildlife Project No.: 2008-800-00, Contract 45235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 24 North, Range 17 West, Section 31, Lake County, Montana

91

Microsoft Word - WCT_CX_5.4.12.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Lee Watts Project Manager - KEWM-4 Proposed Action: Reintroduction of westslope cutthroat trout in the Pend Orielle basin. Fish and Wildlife Project No.: 2007-149-00, Contract #BPA-57129 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.20 Small-scale activities undertaken to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders or minor diversion channels), or fisheries. Location: Two Creeks would be included in the project: ď‚· Cee Cee Ah Creek: Township 34 North, Range 44 East, Section 28, Pend Oreille County, WA ď‚· East Fork Smalle Creek: Township 33 North, Range 43 East, Section 6, Pend Oreille County, WA

92

Microsoft Word - CX_PistolCreek_Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2011 25, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes for purchase of the Pistol Creek Property. Fish and Wildlife Project No.: 2002-003-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 17 North, Range 18 West, Sections 30 and 31, Lake County, MT.

93

Microsoft Word - Green_Island_Addition__Melevin__CX_10-21.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to The McKenzie River Trust (MRT) for purchase of Melevin Property Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 16 South, Range 3 West, Section 31 of the Coburg Quad, in Lane County,

94

Microsoft Word - Green_Island_Addition__Melevin__CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to The McKenzie River Trust (MRT) for purchase of Melevin Property Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 16 South, Range 3 West, Section 31 of the Coburg Quad, in Lane County,

95

Microsoft Word - CX_ThorneCreek_Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes for purchase of the Thorne Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract CR-201269 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

96

Microsoft Word - WCT_CX_draft1_5.18.11.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lee Watts Project Manager - KEWM-4 Proposed Action: Reintroduction of westslope cutthroat trout in the Pend Orielle basin. Fish and Wildlife Project No.: 2007-149-00, Contract #BPA-52530 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.20 Small-scale activities undertaken to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders or minor diversion channels), or fisheries. Location: Four Creeks will be included in the project: ď‚· Cee Cee Ah Creek: Township 34 North, Range 44 East, Section 28, Pend Oreille County, WA ď‚· Middle Creek: Township 35 North, Range 44 East, Section 15, Pend Oreille County, WA ď‚· Upper West Branch: Township 35 North, Range 45 East, Section 25, Pend Oreille

97

Microsoft Word - CX_Priest_River_Acquistiont.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lee Watts Lee Watts Project Manager - KEWM-4 Proposed Action: Provision of funds to the Kalispel Tribe of Indians (Kalispell) for purchase of Priest River (Flesher) property. Fish and Wildlife Project No.: 1992-061-00, Contract # BPA-004991 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level or in a form that would pose a threat to public health or the environment. Location: Township 59 North, Range 5 West, Section 20 of the Galena Point and Outlet Bay

98

Microsoft Word - DiamondB_Easement_CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2011 16, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife & Parks to purchase the Diamond B conservation easement. Fish and Wildlife Project No.: 2008-800-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there will be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 28N, Range 20W, Sections 28 and 33 in Flathead County, MT

99

Microsoft Word - CSKT_CXMemo_12062010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09, 2010 09, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Confederated Salish and Kootenai Tribes (CSKT) for purchase of the Conrad Drive Land Acquisition. Fish and Wildlife Project No.: 2002-003-00, Contract # BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

100

Microsoft Word - BIAddition_Hunsaker__CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 REPLY TO ATTN OF: Israel Duran KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to McKenzie River Trust for purchase of Big Island Addition (Hunsaker) Property Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - Wolf Fork CX-Environ Clearance Memo-CX 021511.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sarah Branum Sarah Branum Project Manager, KEWM-4 Proposed Action: Provide funds for the Blue Mountain Land Trust (BMLT) to purchase a conservation easement on the Wolf Fork property. Fish and Wildlife Project No.: 1996-046-01, Reference Number BPA-005911. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 9 North, Range 39 East, Section 11 T of the Dayton Quadrangle, in

102

Microsoft Word - Trappist_Abbey_CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Israel Duran - KEC-4 Israel Duran - KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to acquire a conservation easement of the 1310-acre Trappist Abbey property. Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 3 South, Range 3 West, Sections 19-21, 28-33 of the Dundee Quad, in Yamhill

103

Microsoft Word - CSKT_Lake_County_AcquisitionsCreek-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes (CSKT) for purchase of Lake County properties. Fish and Wildlife Project No.: 2002-003-00, Contract 49933 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

104

Microsoft Word - Post_Skidoo_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Confederated Salish and Kootenai Tribes (CSKT) for purchase of Skidoo Creek, Post Creek, and Bird's Eye View properties Fish and Wildlife Project No.: 2002-003-00, contract 55869 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Locations: Skidoo Creek Property Township 23 North, Range 19 West, Section 22 Lake County, MT 112 Acres Post Creek Property Township 19 North, Range 19 West, Section 7 Lake County, MT 5 Acres Bird's Eye View Township 23 North, Range 18

105

Implementation Proposal for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

106

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will take place at Varentec Inc. (San Jose, CA), Georgia Tech University (Atlanta, GA), Electric Power Research Institute (Knoxville, TN), and Waukesha Electric Systems Inc....

107

Chapter 2 Proposed Action and Alternatives  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

capabilities at other laboratories. NREL would also improve its high-performance computing capability with space for high- Final EA Page 2-18 July 2003 Site-Wide...

108

Standards Actions, May 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

109

EIS-0389: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0389: Mitigation Action Plan Trinity Public Utilities District Direct Interconnection Project Western Area Power Administration (Western) proposes to...

110

EA-1595: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor...

111

Standards Actions, May 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

112

Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Testbed Results Current Testbed Research Proposal Process Terms and Conditions Dark Fiber Testbed Performance (perfSONAR) Software & Tools Development Partnerships...

113

Unsolicited Proposals  

Directives, Delegations, and Requirements

The order sets forth Department of Energy (DOE) requirements and responsibilities for the receipt, processing, and review of unsolicited proposals (USPs). To ensure that those submitting USPs are notified in a timely manner of the status (e.g., pending, accepted for funding, or declined) of their proposals. Cancels DOE O 542.2. Certified 12-28-06.

2002-02-27T23:59:59.000Z

114

Conceptual Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

-1-08 submitted to Energy Engineering -1-08 submitted to Energy Engineering Action-Oriented Benchmarking: Using the CEUS Database to Benchmark Commercial Buildings in California Paul Mathew & Evan Mills, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT The 2006 Commercial End Use Survey (CEUS) database developed by the California Energy Commission is a far richer source of energy end-use data for non-residential buildings than has previously been available and opens the possibility of creating new and more powerful energy benchmarking processes and tools. In this article - Part 2 of a two-part series - we describe the methodology and selected results from an action-oriented benchmarking approach using the new

115

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

116

Unsolicited Proposals  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's (DOE’s) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.   

117

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21813 21813 Vol. 76, No. 75 Tuesday, April 19, 2011 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Proposed rule. SUMMARY: The U.S. Department of Energy (DOE or the ''Department'') proposes to amend the compliance dates for revisions to its certification, compliance, and enforcement regulations for certain commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the ''Act''). Specifically, DOE is tentatively proposing an 18-month extension to the

118

April 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

119

July 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

120

October 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

February 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

122

July 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

123

May 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

124

November 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

125

August 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

126

October 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

127

April 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

128

August 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

129

Emergencies and Emergency Actions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

130

Proposed Rules DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 76, No. 1 / Monday, January 3, 2011 / Proposed Rules DEPARTMENT OF ENERGY [Docket ID: DOE-HQ-2010-0002] 10 CFR Part 1021 RIN 1990-AA34 National Environmental Policy Act Implementing Procedures AGENCY: Office of the General Counsel, U.S. Department of Energy. ACTION: Notice of proposed rulemaking and public hearing. SUMMARY: The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the

131

August 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

132

July 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

133

Proposed Transmission Towers Proposed New Substation Sites Proposed...  

NLE Websites -- All DOE Office Websites (Extended Search)

6-1E: Recreation Inset Maps for Map 6-1C and Map 6-1D Proposed Transmission Towers Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads...

134

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...  

Office of Environmental Management (EM)

Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

135

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

136

LANSCE | User Resources | Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Lujan Neutron Scattering Center: First Call for Proposals is now Closed. Thank you for your Submission. Proposal Submission The Lujan Center call for proposals opens May 6, 2014....

137

LANSCE | User Resources | Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals LANSCE accepts proposals for the Lujan Neutron Scattering Center, Proton Radiography (pRad) and the Weapons Neutron Research Facility (WNR). Calls for proposals are...

138

Climate change action plan  

E-Print Network (OSTI)

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

139

Comparing Double String Theory Actions  

E-Print Network (OSTI)

Aimed to a deeper comprehension of a manifestly T-dual invariant formulation of string theory, in this paper a detailed comparison between the non-covariant action proposed by Tseytlin and the covariant one proposed by Hull is done. These are obtained by making both the string coordinates and their duals explicitly appear, on the same foot, in the world-sheet action, so "doubling" the string coordinates along the compact dimensions. After a discussion of the nature of the constraints in both the models and the relative quantization, it results that the string coordinates and their duals behave like "non-commuting" phase space type coordinates but their expressions in terms of Fourier modes generate the oscillator algebra of the standard bosonic string formulation. A proof of the equivalence of the two formulations is given. Furthermore, open-string solutions are also discussed.

Luca De Angelis; S. J. Gabriele Gionti; Raffaele Marotta; Franco Pezzella

2013-12-27T23:59:59.000Z

140

International action plan on the radiation protection of patients  

Science Journals Connector (OSTI)

......implementation of the Action Plan, and to make proposals...The steering panel reviews progress and makes additional...International Action Plan on the Radiation Protection...financial base or have a regulatory requirement to produce...International action plan for the radiological......

Madan M. Rehani; Ola Holmberg; Pedro Ortiz López; Fred Mettler

2011-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE  

Office of Legacy Management (LM)

ADDENDUM TO ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS FOR FY 1983-85 ACCELERATED PROGRAM (1984 VICINITY PROPERTIES CLEANUP) Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee CONTENTS Page SUMMARY OF PROPOSED ACTION AND RELATED ACTIVITIES ........... 1 HISTORY AND ENVIRONMENTAL SETTING ........................ 4 RADIOLOGICAL CONTAMINATION AND NEED FOR PROPOSED ACTION ........ 4 Property A .. . . . . . . . . . . . . . . . .. . . . . . . 6 Property C' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Property H ...... ............. ... 7 Property H' . . . . . . . . . . . . . . . . . . .. . . . . . . . . 7 Property L ..... ...... .

142

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

143

NHMFL Emergency Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

144

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

145

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research...

146

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the...

147

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Office General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

148

PROPOSAL PREPARATION INSTRUCTIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

the escalation factors used for each fiscal year, the source of the proposed escalation rates, and the rationale as to why the proposed escalation rates are reasonable. (l)...

149

Scientific Partner Proposals | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Partner Proposals One Scientific Partner's Experience Ron Heeren, with AMOLF in The Netherlands, collaborated with EMSL scientists through a Scientific Partner Proposal. As a...

150

EMSL: Proposal Extensions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Summary/Extension for Fiscal Year 2014 Proposal Summary/Extension for Fiscal Year 2014 Published December 2013. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo Summaries of the work performed with EMSL resources are required for all user projects (see details below) and should be submitted through the User Portal. For projects open for one year or less, these summaries are due when the proposal closes. For projects that are submitted in response to a Call for Proposals and are eligible for yearly extensions, summaries are

151

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of

152

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

153

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

154

EMSL: Proposal Guidance:  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

155

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

156

Corrective and Preventive Action  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

157

May 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

158

2014 ALCC Proposals Due  

NLE Websites -- All DOE Office Websites (Extended Search)

ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier (0 Comments) DOE's 2014 call for its ASCR Leadership Computing...

159

CY15 Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

be given to JLF proposals that link to experiments, or proposed experiments, at the x-ray free electron laser facility Linear Coherent Light Source (LCLS) located at the SLAC...

160

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals Print Tuesday, 01 June 2010 09:36 General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Resubmitting a Proposal | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

be competing for more limited resources as a General proposal outside of the Call. Assess Peer Review Results Before you choose whether to revise and resubmit your proposal or...

162

BS.l Actions to Conserve Energy-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BS.l Actions to Conserve Energy- BS.l Actions to Conserve Energy- Revision 0 Sitewide Categorical Exclusion for Actions to Conserve Energy Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office L11tegrated Management System Procedure, NEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

163

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

164

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

165

General User Proposal Scores  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposal Scores General User Proposal Scores General User Proposal Scores Print Tuesday, 01 June 2010 10:34 Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beamtime requests exceed available beamtime, a cutoff score is assigned after which no beam time is allocated. proposal scores Beam Time Cutoff Scores for the Current Cycle The table below lists the percent of beam time shifts allocated/requested for each beamline, and the cutoff scores, below which no beam time was assigned.

166

EA-1870: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

167

ARM - Submitting Proposals : Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

168

NETL: Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) as outlined in the link below which includes all DOE Program Research Areas. The...

169

Proposal Opportunities | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Collaborative Science Initiative). Proposals are encouraged that couple experiments with theory, modeling or simulation, and access is granted beginning October 1 following award...

170

2015 Electricity Form Proposals  

Annual Energy Outlook 2012 (EIA)

include Congress, other government agencies, state governments, business and industry, private analysts and forecasters, and the general public. The proposed form was announced to...

171

SPPR Group Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Proposal June 23, 2010 Agenda Purpose of Meeting Presenters Background Information  Three Terminal Plan & Market Access  Business Case  Transmission Infrastructure Program ED5-Palo Verde Project Potential Rate Impacts Discussion / Comments 2 Purpose of Meeting Provide background information Share the SPPR Group's current proposal and how it might affect Parker-Davis Project (P-DP) customers Obtain your feedback on the proposal 3 Presenters Background Information - Todd Rhoades ED5-PV Project Description - Todd Rhoades Project Marketability - John Steward Project Cost & Financing - Jack Murray Potential Rate Impacts - Jack Murray Next Steps - Todd Rhoades 4 Three Terminal Plan November 2009 5 Business Case

172

October 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

173

Standards Actions, July 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

174

November 2013 ANALYSIS OF RAW ACTIONS ADDRESSING RFS  

E-Print Network (OSTI)

environmental resource areas for the proposed RAW actions associated with RFS contamination described in SectionNovember 2013 5-1 CHAPTER 5 ANALYSIS OF RAW ACTIONS ADDRESSING RFS CONTAMINATION This chapter discusses the environmental setting, impacts, and mitigation measures for the 14 fully evaluated

Lee, Jason R.

175

Chapter 1 Purpose of and Need for Action  

NLE Websites -- All DOE Office Websites (Extended Search)

and Acronyms. Chapter 1 Purpose of and Need for Action Bonneville Power Administration (BPA) is proposing to build a 500-kilovolt (kV) lattice-steel tower transmission line that...

176

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

177

May 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

178

Doctoral school COURSE PROPOSAL  

E-Print Network (OSTI)

Doctoral school COURSE PROPOSAL ED SPIM / Course proposal Page 1/2 2013 Title: The Web of data This course will give an overview of the principles of Linked Data along with the Web of Data, as it emerged architectures. This course also presents the concepts and definitions related to the Semantic Web (or Web

Jeanjean, Louis

179

Callfor2011 Grant Proposals  

E-Print Network (OSTI)

Callfor2011 Internship Grant Proposals Internship Grant Proposals are due on Monday, February 7, 2011 Communications Communications received an internship grant to estab- lish an internship program in the area. School of Family Life Anthropology Health Sciences Past Internship Grant Spotlights The School

Martinez, Tony R.

180

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Corrective Action Program Guide  

Directives, Delegations, and Requirements

This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

2006-03-02T23:59:59.000Z

182

Proposal Review Panel Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Descriptions Proposal Review Panel Descriptions To ensure competent scientific review, a proposal may be assigned to a different panel (at the discretion of the Review Panel Chair), or the panel may seek additional ad hoc reviews from other experts. High-Pressure This panel reviews scattering and diffraction proposals that focus on materials at high pressure. Techniques such as (but not limited to) diffraction, nuclear resonant scattering, and inelastic x-ray scattering for materials at high pressure are appropriate for this panel to consider. Instrumentation This panel reviews proposals related to the development of beamline instrumentation, sample environments, x-ray optical components, and/or detectors that are relevant to synchrotron radiation research. This panel

183

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

184

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

185

EA-1592: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

186

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiates Enforcement Actions Against 4 Showerhead Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) March 7, 2010 - 3:41pm Addthis The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited for failing to certify to DOE that showerheads manufactured or distributed within the United States meet the applicable water conservation standards as required by the Energy Policy and Conservation Act (EPCA) and DOE regulations. This Notice of Proposed Civil Penalty proposes payments to the government of $1,920,200. Under federal law, manufacturers of some products covered by EPCA are required to

187

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test...

188

May 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2009 May 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

189

February 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 2009 February 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

190

Standards Actions - April 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-28-2002 3-28-2002 Activity Summary In Conversion - 4 In Preparation - 44 Out for Comment - 13 Published this Month - 2 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Canceled 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standards Re- cently Published 2 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- April 2002 Standards Actions DOE Technical Standards Project Canceled

191

July 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

192

Action-Oriented Benchmarking:  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb-2008 submitted to Energy Engineering Feb-2008 submitted to Energy Engineering Action-Oriented Benchmarking: Concepts and Tools Evan Mills, Paul Mathew & Mary Ann Piette, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article-Part 1 of a two-part series-we describe an "action-oriented benchmarking" approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful

193

May 2010 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

194

Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production DOE/EA-1532 June 2005 National Nuclear Security Administration Sandia Site Office P.O. Box 5400 Albuquerque, New Mexico 87185-5400 Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production i Final EA DOE/EA-1532 June 2005 TABLE OF CONTENTS 1.0 PURPOSE AND NEED FOR AGENCY ACTION ........................................................................ 1 2.0 NO ACTION AND PROPOSED ACTION ALTERNATIVES...................................................... 2 2.1 No Action Alternative....................................................................................... 5

195

Locations Everyone: Lights, Camera, Action!  

Science Journals Connector (OSTI)

Locations Everyone: Lights, Camera, Action! ... Harvard Institute of Proteomics Harvard Medical School ...

Robert F. Murphy; Joshua LaBaer

2008-12-05T23:59:59.000Z

196

EIS-0472: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

197

Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 84 Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia June 2002 U. S. Department of Energy Oak Ridge Operations Oak Ridge, Tennessee DOE/EA-1384 i TABLE OF CONTENTS Executive Summary.....................................................................................................................1 1. INTRODUCTION..................................................................................................................... 6 1.1 PREVIOUS ACTIONS ............................................................................................................................................. 6 1.2 SCOPE OF THIS PROPOSED ACTION..............................................................................................................

198

A Proposed Architecture  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposed Proposed Architecture for the NLC Diagnostic Regions Peter Tenenbaum, for the Diagnostic Region Group LCC-Note-0011 Draft 5-February-1999 1 introduction The NLC Main Linac CD-1 design contains 4 diagnostic regions (injection, extraction, and at the junctions between supersectors); the injector and beam delivery regions contain additional diagnostic regions modelled on those in the main linac, and one additional region may be added to the main linac (at the 330 GeV point, halfway through the third supersector). Each diagnostic region must support a variety of different beam measuring and manipulating tasks. In this Note we propose an overall architecture which permits all of these requirements to be met. 2 Requirements The main linac diagnostic regions must provide the following: * Beam position monitors for use by the conventional fast feedback system, and actuators (DC

199

A proposed gravitodynamic theory  

E-Print Network (OSTI)

This paper proposes a gravitodynamic theory because there are similarities between gravitational theory and electrodynamics. Based on Einstein's principle of equivalence, two coordinate conditions are proposed into the four-dimensional line element and transformations. As a consequence,the equation of motion for gravitational force or inertial force has a form similar to the equation of Lorentz force on a charge in electrodynamics. The inertial forces in auniformly rotating system are calculated, which show that the Coriolis force is produced by a magnetic-type gravitational field. We have also calculated the Sagnac effect due to the rotation. These experimental facts strongly support our proposed coordinate conditions. In addition, the gravitodynamic field equations are briefly discussed. Since only four gravitational potentials (3 + 1 split) enter the metric tensor, the gravitodynamic field equations in ``3+1 split" form would be analogous to Maxwell's equations.

T. Chang

1997-03-18T23:59:59.000Z

200

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Unsolicited Proposals | Department of Energy  

Office of Environmental Management (EM)

Unsolicited Proposals Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory...

202

May 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Revisions 1 DOE Technical Standards Projects Initiated 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 04-27-2005 Activity Summary In Conversion - 4 In Preparation - 25

203

POSITION MANAGEMENT ACTION FORM  

E-Print Network (OSTI)

POSITION MANAGEMENT ACTION FORM Workforce Planning | 408-924-2250 classcomp@sjsu.edu SJSU Human FOR POSITION MANAGEMENT FORM Workforce Planning | 408-924-2250| classcomp@sjsu.edu SJSU Human Resources Revised contact your Workforce Planning Analyst. List the name of the position this position reports to

Eirinaki, Magdalini

204

Restoration 2013 ACTION PLAN  

E-Print Network (OSTI)

Study Taskforce, Lower Columbia Fish Recovery Board, Lower Columbia Estuary Partnership, National Marine are intended to guide or inform, as appropriate, the Actions Agencies (BPA/Corps), National Marine Fisheries was prepared by the BPA/Corps with review by and collaboration with regional restoration sponsors, researchers

205

UCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 1  

E-Print Network (OSTI)

UCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 1 UCSF Sustainability Action Plan: Appendix V: UCSF Energy Targets and Strategies Issue Date: August 18, 2011 #12;UCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 2 Proposed Targets

Yamamoto, Keith

206

Project Proposal Project Logistics  

E-Print Network (OSTI)

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

207

Proposed Drill Sites  

SciTech Connect

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

2013-06-28T23:59:59.000Z

208

Proposed Drill Sites  

DOE Data Explorer (OSTI)

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

209

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75798 75798 Vol. 76, No. 233 Monday, December 5, 2011 DEPARTMENT OF ENERGY 5 CFR Chapter XXIII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its

210

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18954 18954 Vol. 76, No. 66 Wednesday, April 6, 2011 DEPARTMENT OF ENERGY 5 CFR Chapters XXIII and XXIV 10 CFR Chapters II, III, and X 18 CFR Chapter I 41 CFR Chapter 109 48 CFR Chapter 9 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information; extension of public comment period. SUMMARY: On February 3, 2011, the Department of Energy (DOE) published a request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review.'' This document announces that the period for submitting reply comments is extended to April 15, 2011. The February 3 document incorrectly published in the Notices section of the Federal Register.

211

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31548 31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' is extended to June 19, 2012. DATES: DOE will accept comments, data, and information regarding the RFI received no later than June 19, 2012. ADDRESSES: Interested persons are encouraged to submit comments, identified by ''Regulatory Burden RFI,'' by any of the following methods:

212

Proposed Rules Federal Register  

NLE Websites -- All DOE Office Websites (Extended Search)

43015 43015 Vol. 77, No. 141 Monday, July 23, 2012 DEPARTMENT OF ENERGY 10 CFR Part 431 [Docket No. EERE-2010-BT-STD-0027] RIN 1904-AC28 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of public meeting and availability of preliminary technical support document. SUMMARY: The U.S. Department of Energy (DOE or Department) will hold a public meeting to discuss and receive comments on the following: the equipment classes DOE plans to analyze for the purpose of amending energy conservation standards for certain commercial and industrial electric motors under section 342(b) of the

213

EA-1779: Proposed Changes to the Sanitary Biosolids Land Application  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Proposed Changes to the Sanitary Biosolids Land 79: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Summary This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee. Base on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of NEPA, and that preparation of an environmental impact statement is not required.

214

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

SciTech Connect

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

215

Standards Actions, July 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2001 6-27-2001 Activity Summary In Conversion - 4 In Preparation - 42 Out for Comment - 15 Published this Month - 1 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standard Recently Published 1 American National Standards Institute 2 American National Standards 3 American Society for Testing and Materials 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. July 2001 Standards Actions DOE Technical Standards Projects Initiated

216

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

217

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

218

SAVEnergy Action Plans  

SciTech Connect

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

219

February 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

220

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

February 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2

222

November 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Revisions 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association

223

April 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 Technical Standards Published 2 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical

224

April 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status

225

Oklahoma State University proposed Advanced Technology Research Center. Environmental Assessment  

SciTech Connect

The Department of Energy (DOE) has prepared an Environmental Assessment (EA) evaluating the construction and equipping of the proposed Advanced Technology Research Center (ATRC) at Oklahoma State University (OSU) in Stillwater, Oklahoma. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required.

NONE

1995-06-01T23:59:59.000Z

226

Proposed solar two project Barstow, California  

SciTech Connect

This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

Not Available

1994-01-01T23:59:59.000Z

227

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network (OSTI)

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

228

Proposal to market Provo River Project power, Salt Lake City area  

SciTech Connect

This report is an environmental assessment of the Western Area Power Administrations`s proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations.

Not Available

1995-01-01T23:59:59.000Z

229

SSRL- Proposal Review Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Synchrotron Radiation Lab Stanford Synchrotron Radiation Lab search Go [an error occurred while processing this directive] Proposal Review Panel Sub Panels Structural Molecular Biology & Biophysics Materials 1: Structure, Reactivity & Self-Assembly Materials 2: Electronic Properties, Magnetic Properties & Surface Science Molecular Environmental & Interface Science Membership Torgny Gustafsson Rutgers University Dept of Physics & Astronomy 136 Frelinghuysen Rd Piscataway NJ 08854-0849 Victor Henrich Yale University Dept of Applied Physics 327 Becton Center, 15 Prospect St. New Haven CT 06511 Christopher P. Hill University of Utah Biochemistry 15 N. Medical Dr. East, Rm 4100 Salt Lake City, UT 84112-5650 Franz Himpsel University of Wisconsin Dept of Physics 1150 University Avenue

230

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

231

EA-1755: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

232

EA-1706: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

706: Mitigation Action Plan 706: Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - allowing the State of Tennessee to use some of its State Energy Program funds appropriated in the American Recovery and Reinvestment Act to construct and operate the West Tennessee Solar Farm Project - would not result in any significant environmental impacts. Mitigation Action Plan for the West Tennessee Solar farm Project Haywood County, Tennessee, DOE/EA-1706 More Documents & Publications EA-1706: Finding of No Significant Impact EA-1706: Final Environmental Assessment 2012 Annual Planning Summary for Fossil Energy, National Energy Technology

233

Mitigation Action Plans (MAP) and Related Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1, 2010 December 1, 2010 EA-1782: Mitigation Action Plan University of Delaware Lewes Campus Onsite Wind Energy Project September 1, 2010 EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi August 24, 2010 EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico July 10, 2010 EIS-0026: 2010 Annual Mitigation Report Waste Isolation Pilot Plant June 4, 2010 EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi January 1, 2010 EA-1755: Mitigation Action Plan

234

EA-1901: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Mitigation Action Plan 1: Mitigation Action Plan EA-1901: Mitigation Action Plan Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This Mitigation Action Plan (MAP) is referenced in the Finding of No Significant Impact for the Kootenai River White Sturgeon and Burbot Hatcheries Project (Department of Energy Environmental Assessment-1901). This MAP includes all of the mitigation measures recommended in the Final Environmental Assessment to mitigate adverse environmental impacts. It includes some measures that are essential to render the impacts of the Proposed Action not significant and other measures that will decrease impacts that did not reach a level to be considered significant. EA-1901-MAP-2013.pdf More Documents & Publications

235

Proposed Energy Transport Corridors: West-wide energy corridor programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Transport Corridors: West-wide energy corridor Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the environmental impacts from the proposed action and the range of reasonable alternatives. The proposed action calls for designating more than 6,000 miles of energy transport corridors across the West. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. More Documents & Publications

236

Standards Actions, February 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standards Recently Published 1 Non-Government Standards 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 5 American Society for Testing and Materials (ASTM) 6 American Nuclear Society (ANS) 11 National Fire Protection Association (NFPA) 12 DOE Technical Standards Program Document Status 01-23-2004 Activity Summary In Conversion - 4 In Preparation - 36 Out for Comment - 23 Published in January - 3 5-year Review Status Revision in Progress - 13 Reaffirmation in Progress - 26 Cancellation Pending - 1 Cancellation in Progress - 3 No Current Action - 0 Inside This Visit the Technical Standards Program

237

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

238

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

239

April 2011 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3009 3009 Revision * DOE Standard 1066 Revision * New DOE Standards Projects * Incidents of Security Concern Technical Standard * Explosives Safety * Operations Assessment Field Handbook * Reporting of Radioactive Sealed Sources Program * Occurrence Reporting Causal Analysis Guide * Nuclear Safety-Related Standards Activity INSIDE THIS ISSUE April 2011 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Standard 3009 Revision The Office of Nuclear Safety Policy and Assistance (HS-21), within the Office of Health, Safety and Security (HSS), conducted workshops in January and March to support a major revision of Department of Energy (DOE) Standard 3009, Preparation Guide for U.S. Department of Energy Nonreactor

240

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

242

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

243

Proposal Team: C. Burger  

NLE Websites -- All DOE Office Websites (Extended Search)

COMPLEX MATERIALS SCATTERING ( ) COMPLEX MATERIALS SCATTERING ( ) Proposal Team: C. Burger 1 , K. Cavicchi 2 , E. DiMasi 3 , A. Fluerasu 3 , S. Fraden 4 , M. Fukuto 3 , O. Gang 3 , B.S. Hsiao 1 , R.J. Kline 5 , S. Kumar 6 , O. Lavrentovich 6 , B. Ocko 3 , R. Pindak 3 , M. Rafailovich 1 , R.A. Register 7 , S. Sprunt 6 , H.H. Strey 1 , B.D. Vogt 8 , W.-L. Wu 5 , L. Wiegart 3 , K.G. Yager 3 1 Stony Brook University, 2 University of Akron, 3 Brookhaven National Lab, 4 Brandeis University, 5 NIST, 6 Kent State University, 7 Princeton University, 8 Arizona State University TECHNIQUES AND CAPABILITIES KEY CONCEPTS SELECTED APPLICATIONS * Small- and wide-angle x-ray scattering on 3PW source, in transmission and reflection mode: USAXS, SAXS, WAXS, GISAXS, GIXRD * High-throughput x-ray scattering for intelligent exploration of vast parameter spaces

244

DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for  

NLE Websites -- All DOE Office Websites (Extended Search)

Institutes Enforcement Action against 4 Showerhead Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products January 28, 2010 - 1:49pm Addthis WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, Ltd. for failing to certify to the Department of Energy that showerheads manufactured or distributed by these companies meet the applicable water conservation standard as required by the Energy Policy Conservation Act and DOE's regulations. These Notices of Proposed Civil Penalty collectively propose payments to the government of over $3 million. Unless the manufacturers settle these claims within

245

January 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 12-27-2007 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 26 Published in December - 4 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/

246

November 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-29-2007 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 30 Published in October - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/

247

February 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 01-28-2008 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 24 Published in January - 3 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/

248

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Temp Data Fields Matthews, Patrick...

249

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

250

February 2013 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

251

Standards Actions, April 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canceled Canceled The following DOE Technical Standards projects were recently canceled. If you have any questions about this action, please contact the persons listed below. • Accelerated Learning - A Systematic Approach, Project Number 6910-0061; Eula Baldwin, EH-31; 208-526-9472, egb@inel.gov. The need for this document no longer exists. • Environmental Safety and Health Configuration Guide, Project Number FACR-0013; Chan- dra S. Majumdar, EM-23; 301-903-7904, Fax 301-903-4423, Chandra.Majumdar @em.doe.gov. The need for a DOE Technical Standard on this matter no longer exists. • Occupational Safety and Health Handbook, Project Number HFAC-0011; Terry Krietz, EH-51; 301-903-6456, Fax 301-903-2239, Terry.Krietz@hq.doe.gov. The need for this document no longer exists.

252

Standards Actions - May 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Canceled Project Canceled The following DOE Technical Standards project was recently canceled. If you have any questions about this action, please contact the person listed below. • Equipment Qualification Program for DOE-Owned Nuclear Facilities and Operations, Project Number FACR-0012; Samuel Rosenbloom, EH-31; 301-903-5749, Fax 301-903- 8693, Samuel.Rosenbloom@eh.doe.gov. The need for this document no longer ex- ists. DOE Technical Standards Recently Published The following DOE Technical Standard has recently been published: • DOE-STD-1063-2000, Facility Representatives, March 2000. This document updates and supersedes DOE-STD-1063-97, October 1997. DOE employees and DOE contractors may obtain copies from the ES&H Technical Infor- mation Services, U.S. Department of Energy; 1-800-473-4375, Fax 301-903-9823.

253

Standards Actions - January 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Initiated Projects Initiated The following DOE Technical Standards projects were recently initiated. If you have any questions or are interested in participating in the development of these stan- dards, please contact the per- sons listed below. • Establishing and Maintaining a Facility Representative Pro- gram at DOE Facilities , Project Number MGMT-0003 (revision of DOE-STD-1063-97); David Compton, S-3.1, 202-586-1034, Fax 202-586-3472, David .Compton@hq.doe.gov. • Nuclear Explosive Safety Study Process, Project Number SAFT- 0074 (Revision of DOE-STD- 3015-97); Helmut Filacchione, DP-21, 301-903-7519, Fax 301- 903-8628, Helmut.Filacchione @hq.doe.gov. DOE Technical Standards Project Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact

254

January 2012 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* DOE Conduct of Operations Standards Revisions * New DOE Standards Projects * DOE Handbook of Operational Safety and Analysis Techniques * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE January 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Conduct of Operations Standards Revisions In the early 1990s, the Department of Energy (DOE) developed 17 technical standards to support DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The standards (STDs), listed below, provided examples, good practices, and expanded explanations of the topics in each chapter of the Order. In June 2010, the Order was revised and issued as DOE Order 422.1, Conduct of Operations. The

255

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

256

Standards Actions - August 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Technical Standards Program Document Status (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) (2000-07-31) Activity Summary In Conversion – 4 In Preparation – 32 Out for Comment – 15 Published this Month – 1 5-year Reviews Revisions in Progress – 3 Reaffirmations in Progress – 0 Supersedures in Progress – 6 Cancellations Pending – 8 Cancellations in Progress – 2 No Current Action – 35 Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ DOE Technical Standards Project Initiated If you have any questions or are interested in participating in the development of this standard, please contact the person listed below. Complete listings of all DOE Technical Standards projects and their status are given in the Web Site referenced at the bottom of this page. To access these

257

EA-1628: Construction and Operation of a Proposed Lignocellulosic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

628: Construction and Operation of a Proposed Lignocellulosic 628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa EA-1628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa SUMMARY This EA evaluated the potential environmental impacts of a DOE proposal to provide financial assistance (the Proposed Action) to POET Project LIBERTY, LLC (POET) for the construction and operation of the lignocellulosic ethanol production facility (Project LIBERTY) near the City of Emmetsburg, Iowa. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 29, 2008 EA-1628: Finding of No Significant Impact Construction and Operation of a Proposed Lignocellulosic Biorefinery, POET Project LIBERTY, LLC, Emmetsburg, Iowa September 29, 2008

258

Ethics to guide environmental action  

Science Journals Connector (OSTI)

Ethics to guide environmental action ... "Environmental Ethics: Choices for Concerned Citizens" is advertised as "a timely guide" for persons wanting "a balanced yet ecologically conscious life-style." ...

1980-12-08T23:59:59.000Z

259

California's Climate Change Proposed Scoping Plan | Open Energy Information  

Open Energy Info (EERE)

Climate Change Proposed Scoping Plan Climate Change Proposed Scoping Plan Jump to: navigation, search Name California's Climate Change Proposed Scoping Plan Agency/Company /Organization State of California Resource Type Publications, Lessons learned/best practices Website http://www.arb.ca.gov/cc/scopi Country United States Northern America References California's Climate Change Scoping Plan[1] Background "The Assembly Bill 32 Scoping Plan contains the main strategies California will use to reduce the greenhouse gases (GHG) that cause climate change. The scoping plan has a range of GHG reduction actions which include direct regulations, alternative compliance mechanisms, monetary and non-monetary incentives, voluntary actions, market-based mechanisms such as a cap-and-trade system, and an AB 32 program implementation regulation to

260

Proposal of MMI-API and Library for JavaScript  

Science Journals Connector (OSTI)

This paper proposes a multimodal interaction API (MMI-API) and a library for the development of web-based multimodal applications. The API and library enable us to embed synchronized ... and actions of dialogue a...

Kouichi Katsurada; Taiki Kikuchi…

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Webinar for Tribes, States, Local Governments, and Territories on the Clean Power Plan Supplemental Proposal  

Office of Energy Efficiency and Renewable Energy (EERE)

On Tuesday, October 28, 2014, EPA issued an action related to the proposed Clean Power Plan to cut carbon pollution from power plants. EPA is following through on its commitment made in June to...

262

Environmental Assessment of Proposed Filbert Substation and Tap Project.  

SciTech Connect

The proposal is a cooperative (jointly funded and owned) action between Bonneville Power Administration (BPS) and FGLandP involving construction of the 115/12.5-kV Filbert Substation. BPA would also build a 0.8-mile overhead 115-kV tapline from BPA's Forest Grove-McMinnville 115-kV line to the proposed substation. The Forest Grove-McMinnville transmission line has available capacity to support the proposed substation. The FGLandP would build four underground distribution circuits to connect the substation to its existing distribution system. It is normally BPA's practice to consider several substation location alternatives as a part of its facility siting process. The proposed substation site was recommended after a preliminary field evaluation by BPA determined that building on the proposed site was preferable because available sites south of the Tualatin Valley Highway and Southern Pacific Railroad were either on presently cultivated farmland, were in a floodplain, or were inaccessible without extensive access road construction. The proposed substation site is owned by FGLandP, is designated for use as a utility substation in the Forest Grove Comprehensive Plan, and was purchased by FGLandP in anticipation of a need for its use as a substation site because of its central location in relation to existing and forecasted loads. The site is accessible from Filbert Street (city road), and is gently sloping. This report describes potential environmental impacts of the proposed actions.

United States. Bonneville Power Administration.

1984-03-01T23:59:59.000Z

263

EA-1440-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1440-S1: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex, Golden, Colorado ThIs Mitigation Action Plan implements the mitigation measures associated with the potential environmental impact of a DOE proposal that consists of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado: Construction of the Research Support Facilities (RSF), a new office building or multi-building office complex; Installation of Phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant

264

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network (OSTI)

Energy, Energy Economics and Policy, and Energy-related Commercialization & Business Development. Other, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends sustain- ability plan. While the initial Climate Action Plan focuses primarily on greenhouse gas emissions

Taylor, Jerry

265

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network (OSTI)

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

266

EIS-0425: Record of Decision and Mitigation Action Plan | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

5: Record of Decision and Mitigation Action Plan 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and maintenance of a coho slamon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action will involve building a new, small, in-basin adult

267

FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM:  

Office of Legacy Management (LM)

FINDING OF MD SIGNIFICANT IMPACT FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM: BAY0 CANYONS, NEW MEXICO Under the Formerly Utilized Sites Remedial Action Program (FUSRAP), the U.S. Department of Energy (DOE) has proposed to carry out rcmedfrl action at a site located in Bayo Canyon, Los Alamos County, New Mexico. Although the site as partially decontaminated and decommissioned in the 196Os, there remain above-background amounts of radionuclides. DOE has determined that strontium-90 in excess of DDE's proposed remedial- action criterir exists in subsurface materials underlying an area of about 0.6 ha (1.5 acres) at the Bayo Canyon site. The proposed action is to demarcate this are8 and restrict its use to activities that will not disturb this sub-

268

ARM - Propose a Field Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsPropose a Campaign govCampaignsPropose a Campaign Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Propose a Campaign : Preproposal Form Preproposals are short summaries of the proposed campaign and can originate with any scientist. Before you begin your preproposal, you should review the guidelines for submitting proposals. If you are preparing your preproposals locally on your computer, please

269

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network (OSTI)

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

270

Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

271

Do good actions inspire good actions in others?  

E-Print Network (OSTI)

Actions such as sharing food and cooperating to reach a common goal have played a fundamental role in the evolution of human societies. These good actions may not maximise the actor's payoff, but they maximise the other's payoff. Consequently, their existence is puzzling for evolutionary theories. Why should you make an effort to help others, even when no reward seems to be at stake? Indeed, experiments typically show that humans are heterogeneous: some may help others, while others may not. With the aim of favouring the emergence of 'successful cultures', a number of studies has recently investigated what mechanisms promote the evolution of a particular good action. But still little is known about if and how good actions can spread from person to person. For instance, does being recipient of an altruistic act increase your probability of being cooperative with others? Plato's quote, 'Good actions give strength to ourselves and inspire good actions in others', suggests that is possible. We have conducted an e...

Capraro, Valerio

2014-01-01T23:59:59.000Z

272

Guidance on the Consideration of Past Actions in Cumulative Effects Analysis  

Energy.gov (U.S. Department of Energy (DOE))

In this Memorandum, the Council on Environmental Quality provides guidance on the extent to which agencies of the Federal government are required to analyze the environmental effects of past actions when they describe the cumulative environmental effect of a proposed action.

273

Recommendations on Alternative Actions for Analysis in Site-wide NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations on Alternative Actions for Analysis in Site-wide Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews Recommendations on Alternative Actions for Analysis in Site-wide NEPA Reviews The purpose o f this memorandum is t o recommend the treatment of the proposed action and the no action alternatives in site-wide National Environmental Pol icy Act (NEPA) reviews that are prepared for continuing and reasonably foreseeable future actions at Department o f Energy (DOE) sites. DOE prepares site-wide NEPA reviews in accordance with section 1021.331 o f the DOE NEPA Regulations (10 CFR Part 1021, published on April 24, 1992 at 57 F R 15122) to improve and coordinate agency plans, functions, programs, and resource utilization, among other reasons. Recommendations on Alternative Actions for Analysis in Site-wide NEPA

274

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Downhole Motors Downhole Motors Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 1: Current Capabilities of Hydraulic Motors, Air/Nitrogen Motors, and Electric Downhole Motors January 30, 2004 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 RIO Technical Services Page 1 NPTO Downhole Motors TABLE OF CONTENTS Section 1.0................................................................................Introduction Section 2.0.................Brief History of Coil Tubing and Summary of Downhole Motors Section 3.0.....................................................................Results and Findings 3.1............Motors

275

PROPOSAL  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydraulic Motion & Fluid Movement Hydraulic Motion & Fluid Movement RIO Technical Services Page 1 Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 2: Hydraulic Motion & Fluid Movement Through Small Diameter Pipes and Wellbores December 12, 2003 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 NPTO Hydraulic Motion & Fluid Movement RIO Technical Services Page 2 TABLE OF CONTENTS Section 1.0 .............................................................................Introduction Section 2.0........................................................................Results& Findings 2.1..........Significant Parameters Affecting Efficient Cuttings Transport

276

Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

MiniBooNE Antineutrino Data Taking The MiniBooNE Collaboration (Dated: February 4, 2009) 1 EXECUTIVE SUMMARY The MiniBooNE experiment at Fermilab was designed to test the LSND...

277

Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

278

STUDENT ADVISOR GUIDELINES PROPOSAL: ASSESSMENTS OF AND PROPOSED CHANGES  

E-Print Network (OSTI)

STUDENT ADVISOR GUIDELINES PROPOSAL: ASSESSMENTS OF AND PROPOSED CHANGES TO THE NJIT ADVISING PROCESS NEW JERSEY INSTITUTE OF TECHNOLOGY STUDENT SENATE STUDENT ADVISOR GUIDELINES COMMITTEE DECEMBER of NJIT as a whole. -2- #12;I. Students' Views of Advisors Obligations These are the recommendations

Bieber, Michael

279

BPA revises oversupply rate proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

oversupply-rate-proposal Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

280

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY  

E-Print Network (OSTI)

.......................................................................................................................4 PROPOSED CALIFORNIA TRANSPORTATION FUEL PRICE FORECASTS......... 6 Summary....................................................................................................6 Petroleum Transportation Fuel Price Forecast Assumptions .............................................................6 California Transportation Fuel Price Forecasts

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

ICDF Complex Remedial Action Report  

SciTech Connect

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

282

Recapping National Energy Action Month  

Energy.gov (U.S. Department of Energy (DOE))

Energy Department officials spent National Energy Action Month on the road, meeting and learning from Americans who are advancing our energy security, growing the economy and protecting the environment.

283

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network (OSTI)

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

284

Environmental Assessment of Proposed Haskill Substation and Tap Line.  

SciTech Connect

To solve the service problems in the Marion area, BPA is proposing to construct a new 230/24.9-kV substation to tap BPA's existing Libby-Conkelly 230-kV line (different than Hot Springs-Conkelly 230-kV line, but an equally acceptable source). Haskill Substation would be approximately one mile northeast of the town of Marion, Montana, and would serve the western portion of Flathead Electric Cooperative's service area. This report describes possible environmental impacts of the proposed action. 8 refs., 4 figs.

Not Available

1984-05-01T23:59:59.000Z

285

Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral  

Open Energy Info (EERE)

Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Jump to: navigation, search Tool Summary Name: Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Agency/Company /Organization: GTZ Sector: Energy Focus Area: Transportation Topics: Implementation, Pathways analysis Resource Type: Publications Website: www.transport2012.org/bridging/ressources/files/1/817,Transport_sector Reducing Emissions Through Sustainable Transport: Proposal for a Sectoral Approach Screenshot References: Reducing Emissions Through Sustainable Transport[1] Summary "The large mitigation potential and associated co-benefits of taking action in the land transport sector can be tapped into by a sectoral approach drawing financial resources from a transport window, in the short term

286

Sandia National Laboratories: International Smart Grid Action...  

NLE Websites -- All DOE Office Websites (Extended Search)

Smart Grid Action Network Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration,...

287

Energy Agency Coordinators for Energy Action Month  

Energy.gov (U.S. Department of Energy (DOE))

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

288

Contract Pricing Proposal Cover Sheet UT-B Contracts Div Page 1 of 1  

E-Print Network (OSTI)

Contract Pricing Proposal Cover Sheet UT-B Contracts Div Mar 2006 Page 1 of 1 contract-price-prop-cover-ext-venx-mar06.doc CONTRACT PRICING PROPOSAL COVER SHEET 1. SOLICITATION /CONTRACT/MODIFICATION NUMBER 2a. NAME'S POINT OF CONTACT AREA CODE NUMBER 4. TYPE OF CONTRACT ACTION (Check)2c. STREET ADDRESS a. NEW CONTRACT c

Pennycook, Steve

289

Definition: Corrective Action Plan | Open Energy Information  

Open Energy Info (EERE)

Corrective Action Plan Corrective Action Plan Jump to: navigation, search Dictionary.png Corrective Action Plan A list of actions and an associated timetable for implementation to remedy a specific problem.[1] View on Wikipedia Wikipedia Definition Corrective action and preventive action (CAPA, also called corrective action / preventive action) are improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. CAPA is a concept within good manufacturing practice (GMP). It focuses on the systematic investigation of the root causes of non-conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive action). Corrective actions are implemented in response to customer complaints,

290

Practical Action | Open Energy Information  

Open Energy Info (EERE)

Action Action Jump to: navigation, search Logo: Practical Action Name Practical Action Address The Schumacher Centre for Technology & Development, Bourton on Dunsmore, Rugby, Warwickshire Place Rugby, Warwickshire Zip CV21 1UB Phone number 01926 634400 Notes Practical Action works alongside communities to find practical solutions to the poverty they face. Website http://www.practicalaction.org Coordinates 52.3910875°, -1.2339112° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.3910875,"lon":-1.2339112,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

291

Enforcement Action EA 98-12  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 1998 6, 1998 Mr. Peyton S. Baker [ ] Babcock & Wilcox of Ohio, Inc. 1 Mound Road Miamisburg, Ohio 45343-3030 EA 98-12 Subject: Preliminary Notice of Violation and Proposed Imposition of Civil Penalty - $165,000 (NTS-OH-MB-BWO-BWO04-1998-0001, NTS-OH-MB-BWO-BWO04-1998-0002, and NTS-OH-MB-BWO-BWO06-1998-0001) Dear Mr. Baker: This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning a number of significant deficiencies in Babcock & Wilcox of Ohio, Inc., (BWO) radiological work controls and bioassay program at the DOE Mound Site and its corrective actions to remedy those deficiencies. DOE initiated an investigation in March 1998 for the radiological work control deficiencies

292

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed -Appendix A  

NLE Websites -- All DOE Office Websites (Extended Search)

A: A: Technical Support Document (TSD) Appendixes i A1 Introduction ........................................................................................ A1-1 A1.1 Methodology for Energy Consumption and Savings Estimate............... A1-2 A1.2 Energy Consumption and Savings Calculation Methodology ................ A1-3 A1.2.1 Device Annual Energy Consumption (AEC) Estimates ...........................A1-3 A1.2.1.1 Equipment Stock, S...................................................................................A1-4 A1.2.1.2 Usage Pattern ..........................................................................................A1-5 A1.2.1.3 Power draw by mode, P ...........................................................................A1-5 A1.2.2 Energy Savings Estimates

293

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed - Appendix C  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX C: APPENDIX C: Data Sheets for New Products Table of Contents Product Page Product Page Commercial Refrigeration Miscellaneous Residential Equipment Standards Consideration C-1 Standards Consideration C-50 Beverage Merchandisers Test Procedure Summary C-3 Ceiling Fans Test Procedure Summary C-52 Standards Consideration C-4 Compact Audio Standards Consideration C-53 Ice Machines Test Procedure Summary C-6 Component Stereo and Rack Audio Standards Consideration C-54 Reach-In Freezers Standards Consideration C-7 Compact Audio, Component Stereo, and Rack Audio Test Procedure Summary C-55 Reach-In Refrigerators Standards Consideration C-9 Standards Consideration C-56 Reach-In Freezers/Refrigerators Test Procedure Summary C-11 Dehumidifiers

294

Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed -Appendix A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A: A: Technical Support Document (TSD) Appendixes i A1 Introduction ........................................................................................ A1-1 A1.1 Methodology for Energy Consumption and Savings Estimate............... A1-2 A1.2 Energy Consumption and Savings Calculation Methodology ................ A1-3 A1.2.1 Device Annual Energy Consumption (AEC) Estimates ...........................A1-3 A1.2.1.1 Equipment Stock, S...................................................................................A1-4 A1.2.1.2 Usage Pattern ..........................................................................................A1-5 A1.2.1.3 Power draw by mode, P ...........................................................................A1-5 A1.2.2 Energy Savings Estimates

295

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

296

Implementation Proposal for the National Action Plan on Demand Response- July 2011  

Energy.gov (U.S. Department of Energy (DOE))

Report to Congress prepared by the staff of the Federal Energy Regulatory Commission (FERC) and the Department of Energy.

297

CEQ Guidance on the Application of NEPA to Proposed Federal Actions...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

not. CEQTransboundaryGuidance070197.pdf More Documents & Publications NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems Purpose and Need: CEQ Exchange of...

298

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

299

DOE Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Takes Action to Stop the Sales of Air-Con Air Conditioner Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown to Violate Federal Energy Efficiency Appliance Standards DOE Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown to Violate Federal Energy Efficiency Appliance Standards September 23, 2010 - 12:00am Addthis Washington, DC - The Department of Energy announced today that it has taken action against Air-Con, International, requiring the company to stop selling certain air conditioning systems in the U.S. that have been shown to violate minimum energy efficiency appliance standards. DOE is proposing a civil penalty of more than $230,000 for importing and distributing these inefficient cooling products. This action and the proposed penalties are part of the Department's continued commitment to act aggressively to remove

300

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

California Energy Commission PROPOSED REGULATIONS ENFORCEMENT PROCEDURES CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor FEBRUARY 2013 CEC3002013002SD #12;CALIFORNIA ENERGY COMMISSION Lorraine Gonzalez Angela Gould Primary Authors and Project Managers Kate Zocchetti

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

186: Mitigation Action Plan 186: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

302

Green Building Action Plan for State Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities < Back Eligibility State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Manufacturing Buying & Making Electricity Solar Lighting Windows, Doors, & Skylights Heating Water Water Heating Wind Program Info State California Program Type Energy Standards for Public Buildings Provider California Energy Commission '''''Note: California voters approved [http://vig.cdn.sos.ca.gov/2012/general/pdf/text-proposed-laws-v2.pdf#nam... Ballot Proposition 39] in November 2012. The new law closes a tax loophole, which is expected to provide $1 billion in additional revenue every year.

303

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

304

CLIMATE ACTION PLAN JUNE 1, 2010  

E-Print Network (OSTI)

UC DAVIS 2009­2010 CLIMATE ACTION PLAN JUNE 1, 2010 #12;UC Davis 2009-2010 Climate Action Plan Page 2 UC DAVIS 2009-2010 CLIMATE ACTION PLAN TABLE OF CONTENTS Acknowledgements...................................................................................................... 24 Chapter 3: Emissions Reduction Actions 3.1 Energy Use Reduction to Date

Schladow, S. Geoffrey

305

Final voluntary release assessment/corrective action report  

SciTech Connect

The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

NONE

1996-11-12T23:59:59.000Z

306

Environmental Assessment and (FONSI) Of The Proposed 7-GeV Advanced Photon Source  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and (FONSI) OF THE PROPOSED and (FONSI) OF THE PROPOSED 7-GeV ADVANCED PHOTON SOURCE Table of Contents LIST OF ABBREVIATIONS AND ACRONYMS ABSTRACT 1.0 INTRODUCTION 1.1 PURPOSE 1.2 THE APS PROJECT AT ANL 1.3 SUMMARY OF THE PROPOSED ACTION 1.4 NEED FOR ACTION 2.0 THE PROPOSED ACTION AND ALTERNATIVES 2.1 DESCRIPTION OF APS AND CONSTRUCTION ACTIVITIES (PROPOSED ACTION) 2.1.1 APS Facility Description 2.1.2 Utility Services 2.1.3 Gaseous Emissions, Liquid Effluents, and Wastes 2.1.4 Construction Activities 2.1.5 Decommissioning 2.2 ALTERNATIVES 2.2.1 No Action 2.2.2 Construction at Another ANL Site 3.0 THE AFFECTED ENVIRONMENT 3.1 SITE DESCRIPTION 3.2 CLIMATOLOGY AND AIR QUALITY 3.2.1 Climatology 3.2.2 Air Quality 3.3 DEMOGRAPHY AND SOCIOECONOMIC PROFILE 3.4 LAND USE 3.4.1 Site and Vicinity

307

Proposal Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Calendar Proposal Calendar 2014 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2014-1 Fri Nov-1-13 Tue Nov-19-13 Tue Dec-10-13 ~Dec-18-13 Tue Jan-28-14 Tue Apr-21-14 2014-2 Fri Mar-7-14 Tue Mar-25-14 Tue Apr-8-14 ~Apr-21-14 ~ May-14 ~Aug-14 2014-3 Fri Jul-11-14 Tue Jul-29-14 Tue Aug-12-14 ~Aug-25-14 ~ Oct-14 ~Dec-14 2015 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2015-1 Fri Oct-31-14 Tue Nov-18-14 Tue Dec--2-14 ~Dec-14-14 ~Jan-15 ~Apr-15 2015-2 Fri Mar-6-15 Tue Mar-24-15 Tue Apr-7-15 ~Apr-20-15 ~ May-15 ~Aug-15 2015-3 Fri Jul-10-15 Tue Jul-28-15 Tue Aug-11-15 ~Aug-24-15 ~ Oct-15 ~Dec-15 2016 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends

308

Deconstructing (2,0) proposals  

Science Journals Connector (OSTI)

We examine the relationships between three proposals for the six-dimensional (2,0) theory: the discrete light-cone quantization (DLCQ) of Aharony et al. [Adv. Theor. Math. Phys. 1, 148 (1998); Adv. Theor. Math. Phys. 2, 119 (1998)], the deconstruction prescription of Arkani-Hamed et al. [J. High Energy Phys. 01 (2003) 083], and the five-dimensional maximally supersymmetric Yang-Mills proposal of Douglas and Lambert et al. [J. High Energy Phys. 02 (2011) 011; J. High Energy Phys. 01 (2011) 083]. We show that Arkani-Hamed et al. gives a deconstruction of five-dimensional maximally supersymmetric Yang-Mills. The proposal of Aharony et al. uses a subset of the degrees of freedom of five-dimensional Yang-Mills, and we show that compactification of it on a circle of finite radius agrees with the DLCQ arising from the proposal of Douglas and Lambert et al. or from the deconstruction proposal of Arkani-Hamed et al.

N. Lambert; C. Papageorgakis; M. Schmidt-Sommerfeld

2013-07-12T23:59:59.000Z

309

Climate Change Action Plan Report  

E-Print Network (OSTI)

Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

Hansen, Andrew J.

310

Know the symptoms. Take action.  

E-Print Network (OSTI)

1 " " Know the symptoms. Take action. heart attack c a l l Don't Take a Chance With a Heart Attack: Know the Facts and Act Fast More than 1 million people in the United States have heart attacks each attack happens, delay in treatment can be deadly. Learn the warning symptoms of a heart attack, and know

Bandettini, Peter A.

311

Know the symptoms. Take action.  

E-Print Network (OSTI)

heart attack Know the symptoms. Take action. c a l l Important Information Fill out the next two:____________________________ Home phone:_______________________ Work phone: ________________________ December 2011 #12;Heart Attack might be having heart attack symptoms or a heart attack, call 9­1­1 immediately. Don't ignore your pain

Bandettini, Peter A.

312

CLIMATE ACTION PLAN SEPTEMBER 2009  

E-Print Network (OSTI)

· ALBUQUERQUE, NEW MEXICO #12;#12;The University of New Mexico is committed to reducing energy usage and ourCLIMATE ACTION PLAN SEPTEMBER 2009 UNIVERSITY OF NEW MEXICO · OFFICE OF SUSTAINABILITY ................................ 18 C. Electricity Recommendation #1 Solar........... 21 D. Electricity Recommendation #2 Smart Grid

Maccabe, Barney

313

Climate Action Champions Informational Webinar  

Energy.gov (U.S. Department of Energy (DOE))

An informational webinar will be held on Thursday, Oct. 9 from 1:00 p.m. - 3:00 p.m. Eastern Standard Time (EST) to provide applicants with an overview of the Climate Action Champions opportunity, the application process, and answer any questions.

314

Compromise strategies for action selection  

Science Journals Connector (OSTI)

...10.1098/rstb.2007.2051 Howard, R 1977Risk preferenceIn Readings in decision analysisMenlo Park, CA:SRI International Humphrys, M. 1996 Action selection methods using reinforcement learning. PhD thesis, University of Cambridge...

2007-01-01T23:59:59.000Z

315

A Novel Approach for Fast Action Recognition using Simple Features Hossein Ragheb  

E-Print Network (OSTI)

were introduced by Bo- bick and Davis [1] to recognize human motions. Rao et al [7] proposed a view discriminative models of human motion and shape within an action. We propose a new method and compare it with two-volumes and compute their corre- sponding mean-power spectra as our feature vectors. Our features result in high

Paris-Sud XI, Université de

316

Graphene membranes and the Dirac-Born-Infeld action  

E-Print Network (OSTI)

We propose the use of the Dirac-Born-Infeld action in the phenomenological description of graphene sheet dynamics and interactions. Both the electronic properties of the Dirac fermions and the overall dynamics can be incorporated into this model. Classical static configurations, as well as quantum fluctuations of the membrane degrees of freedom can be studied in this framework. This makes it an interesting tool for Casimir physics and novel QED processes.

James Babington

2010-05-03T23:59:59.000Z

317

JGI - CSP Proposal Study Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

User Programs User Programs Project Management Office Community Science Program Emerging Technologies Opportunity Program Technology Development Pilot Program Genomic Encyc. of Bacteria and Archaea MyJGI: Information for Collaborators The CSP Proposal Study Panel CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | Project Management | Forms | FAQ | People and Contacts Members Nina Agabian University of California, San Francisco, http://www.ucsf.edu Chris Amemiya Benaroya Research Institute at Virginia Mason, http://www.benaroyaresearch.org Gary L. Andersen Lawrence Berkeley National Laboratory, http://www.lbl.gov Jo Ann Banks Purdue University, http://www.purdue.edu John Battista Louisiana State University, http://www.lsu.edu Fred Brockman

318

III. Waiver of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

382 Federal Register 382 Federal Register / Vol. 77, No. 241 / Friday, December 14, 2012 / Rules and Regulations technical errors in § 447.400(a) and § 447.405 listed on page 66701. One correction ensures consistency between two sentences in the same paragraph and the other restores text inadvertently omitted from the final rule that had been included in the May 11, 2012 notice of proposed rulemaking (77 FR 27671) on pages 26789-90. Thus, we are correcting page 66701 to reflect the correct information. III. Waiver of Proposed Rulemaking We ordinarily publish a notice of proposed rulemaking in the Federal Register to provide a period for public comment before the provisions of a rule take effect in accordance with section 553(b) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). However,

319

Standard Form 424 PROPOSAL INFORMATION SUMMARY  

E-Print Network (OSTI)

this proposal been submitted to any other agency for funding, if so, which? No 13. Proposal Abstract: See .................................................................................................................. 3 Abstract ............................................................................. 10 Proposed Work

Menke, William

320

An Estimate of Residential Energy Savings From IECC Change Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

An Estimate of Residential Energy Savings From IECC Change Proposals An Estimate of Residential Energy Savings From IECC Change Proposals Recommended for Approval at the ICC's Fall, 2009, Initial Action Hearings The U.S. Department of Energy (DOE) has established ambitious goals to improve the energy efficiency requirements of the International Energy Conservation Code (IECC) for residential buildings. DOE has established near- and long-term goals of 30% and 50% energy efficiency improvements, respectively, compared to the 2006 IECC. This report presents DOE's approach to calculating residential energy consumption for the purpose of estimating energy savings attributable to improvements in the code. This approach is then used to estimate the national average energy savings, relative to the 2006 IECC, resulting from the proposed improvements DOE submitted and supported for the 2012 IECC.

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Notice of proposed rulemaking, Energy Efficiency and Sustainable Design  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

proposed rulemaking, Energy Efficiency and Sustainable proposed rulemaking, Energy Efficiency and Sustainable Design Standards for New Federal Buildings, 75 Fed. Reg. 29,933 (May 28, 2010) Notice of proposed rulemaking, Energy Efficiency and Sustainable Design Standards for New Federal Buildings, 75 Fed. Reg. 29,933 (May 28, 2010) Earthjustice respectfully submits the following comments on behalf of Natural Resources Defense Council, the Sierra Club, the D.C. Environmental Network, and Public Citizen. For the benefit of their members and the public, each of these organizations shares a common interest in ensuring that each agency in the Federal government takes prompt action to advance energy efficiency and reduce both its local environmental footprint and its contribution to global warming. Department of Energy ("DOE")

322

EA-1055; Environmental Assessment and (FONSI) for The Proposed Center for Advanced Industrial Processes Washington State University College of Engineering and Architecture  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55; Environmental Assessment and (FONSI) for The Proposed 55; Environmental Assessment and (FONSI) for The Proposed Center for Advanced Industrial Processes Washington State University College of Engineering and Architecture Table of Contents ABBREVIATIONS AND ACRONYMS 1. DOCUMENT SUMMARY 2. PURPOSE AND NEED FOR AGENCY ACTION 3. DESCRIPTION OF ALTERNATIVES INCLUDING THE PROPOSED ACTION 3.1 Description of the Proposed Action 3.2 Project Description 3.2.1 Construction Activities 3.2.2 Operation Activities 3.3 No Action Alternative 4. THE AFFECTED ENVIRONMENT 4.1 Site Description 4.2 Air Quality 4.3 Surface/Ground Water Quality 4.4 Soil 4.5 Sensitive Resources 5. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION 5.1 Construction Impacts 5.1.1 Sensitive Resources 5.1.2 Erosion/Run-Off 5.1.3 Demolition/Construction Waste Disposal 5.1.3.1 Conventional Wastes

323

Action  

National Nuclear Security Administration (NNSA)

and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http: www,nrc.govreading-rmadams.htmI. Persons who do not have access to...

324

Update: Proposed CE Curriculum & Program  

E-Print Network (OSTI)

Update: Proposed CE Curriculum & Program Bruce Jacob, End of Summer 2008 #12;What's all this, then, students, graduates · Held constituents' meeting over winter · Group vote this curriculum Barua has agreed to develop and teach the course ENEE 3xx (Digital systems) -- new course Bruce Jacob

Jacob, Bruce

325

Supplementary Proposal Department of Energy  

E-Print Network (OSTI)

Supplementary Proposal to the Department of Energy High Energy Physics Division for Research and Development for a Bottom Collider Detector in FY 1990 (January 31, 1990) R. Burnstein, H. Rubin Illinois Institute of Technology E. McCliment, Y. Onel U. Iowa N.S. Lockyer, R. van Berg U. Pennsylvania J

McDonald, Kirk

326

Climate Change Proposed Scoping Plan  

E-Print Network (OSTI)

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air Resources #12;CLIMATE CHANGE SCOPING PLAN State of California Air Resources Board Resolution 08-47 December 11 greenhouse gas (GHG) emissions that cause global warming; WHEREAS, the adverse impacts of climate change

327

Climate Change Proposed Scoping Plan  

E-Print Network (OSTI)

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air ResourcesBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

328

Corporate and Foundation Proposal Checklist  

E-Print Network (OSTI)

Corporate and Foundation Proposal Checklist For additional information or assistance, please contact the MSU Foundation Office of Corporate and Foundation Relations at 994-2522 MSU Mission Statement MSU Foundation Mission Statement Needs Statement States the need using hard-core statistics

Dyer, Bill

329

Proposed Revisions for Regents Policy  

E-Print Network (OSTI)

Proposed Revisions for Regents Policy: Faculty Tenure Arlene Carney Vice Provost for Faculty family friendliness for probationary period #12;Basis for Revisions of Faculty Tenure Policy · Changed definitions of Academic Freedom and Responsibility required changes in the tenure policy. · As more untenured

Amin, S. Massoud

330

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

California Energy Commission PROPOSED REGULATIONS MARCH 2012 CEC-400-2010-004-SD3, Article 9, Sections 1680 1685 CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor #12;CALIFORNIA ENERGY COMMISSION Martha Brook Program Senior Mechanical Engineer Justin Regnier Project Manager

331

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

, such as fossil fuelbased power plants, and may ameliorate air quality problems and improve public health renewable energy resources, such as wind, solar, biomass, landfill gas, digester gas, geothermal, or smallCalifornia Energy Commission PROPOSED REGULATIONS INITIAL STATEMENT OF REASONS FOR ENFORCEMENT

332

Review of kaon factory proposals  

SciTech Connect

Nuclear physics issues and particle physics issues for a kaon factory are discussed. Kaon factory accelerator proposals are then considered. Secondary beam considerations are covered and hardware development for a kaon factory is discussed. The prospects for construction are presented. 9 refs., 12 figs., 2 tabs. (GHT)

Thiessen, H.A.

1985-01-01T23:59:59.000Z

333

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

334

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

335

The Standards Actions, October 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Actions October 1996 Documents Recently Published The following DOE documents have recently been published: * DOE-SPEC-3018-96, Flooded-Type Lead-Acid Storage Batter- ies, August 1996. * DOE-SPEC-3019-96, Valve- Regulated Type Lead-Acid Storage Batteries, August 1996. * DOE-TSL-1-96, Department of Energy Standards Index, August 1996. * DOE-TSL-4-96, Directory of DOE and Contractor Personnel Involved in Non-Government Standards Activities, August 1996. DOE employees and DOE contractors may obtain copies from the DOE Office of Scientific and Technical Information (OSTI), P.O. Box 62, Oak Ridge, Tennes- see 37831; telephone 423-576-8401 or FAX 423-576-2865. Subcontractors and the general public may obtain copies from the U.S. Department of Commerce, Technology Administration,

336

AGENCY: ACTION: DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION: ACTION: DEPARTMENT OF ENERGY Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Transfer of Naval Petroleum Reserve No. 3 (DOE/EA-1236) SUMMARY: The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to Apr115 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life

337

The Standards Actions, January 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Actions Resistance of HVAC Air Ducts and Fittings (new standard); comments due February 6, 1996. * ISO/ASQC A3534-1, Statis- tics - Vocabulary and Sym- bols - Probability and Gen- eral Statistical Terms (new standard); comments due January 26, 1996. * ISO/ASTM/ASQC/NSF 14004, Environmental management systems - General guidelines on principles, systems and Technical Standards Program Document Status as of 12/31/95 Documents Recently Published The Technical Standards Program is sponsoring a project at OSTI to place all DOE technical standards (i.e., standards and handbooks) on the Internet. To date, 57 DOE technical standards have been placed on the Internet at the following address: http://apollo.osti.gov/ html/techstds/ techstds.html The following DOE technical standards have recently

338

Action Sheet 36 Final Report  

SciTech Connect

Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

Kips, R E; Kristo, M J; Hutcheon, I D

2012-02-24T23:59:59.000Z

339

Canada Calls for Triclosan Action  

Science Journals Connector (OSTI)

Canada Calls for Triclosan Action ... The Canadian government is urging industry to voluntarily remove the antibacterial chemical triclosan from consumer products because of concerns about its toxicity to aquatic organisms. ... Although triclosan can still be sold and used in Canada in products such as antibacterial soaps, toothpastes, and deodorants, the government plans to work with companies over the next 18 months to better understand usage patterns and to assess alternatives. ...

BRITT ERICKSON

2012-04-09T23:59:59.000Z

340

Take the Energy Action Challenge  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Spherical Pendulum, Actions, and Spin  

Science Journals Connector (OSTI)

To fill this gap, our research group has worked out energy surfaces in action variable representation, for a number of classical problems:? the Euler, Lagrange, and Kovalevskaya cases of rigid body dynamics,8-10 billiards in ellipsoids,11,12 and particle motion around point masses with Schwarzschild or Kerr metric as well as around two fixed centers. ... These tori are mirror images of each other under the spin transformation P. ...

Peter H. Richter; Holger R. Dullin; Holger Waalkens; Jan Wiersig

1996-12-05T23:59:59.000Z

342

Proposed Evanston Offshore Wind Farm  

NLE Websites -- All DOE Office Websites (Extended Search)

Evanston Offshore Wind Farm Evanston Offshore Wind Farm August 1, 2011 Monday, August 1, 2011 Off Shore Wind Farm FAQ Document available from http://www.greenerevanston.org/ at the Renewable Energy Task Force tab Monday, August 1, 2011 City Manager Commits to City to sign onto Kyoto emissions reduction goals Wind Farm Timeline April 2006 Summer 2007 Fall 2008 February 2008 April 2010 March 2011 July 2011 Network for Evanston's Future proposes joint climate planning effort CGE Formed and Renewable Energy Task Force formed - Wind farm concept begun ECAP passed by City Council with 1st version of proposed Offshore Wind Farm included Offshore Wind Farm RFI unanimously passed by City Council Mayor Tisdahl appointments Committee on the Wind Farm City Council

343

Hypothesis regarding a membrane-associated mechanism of biological action due to low-dose ionizing radiation  

Science Journals Connector (OSTI)

A novel theory is proposed regarding the action of ionizing radiation in the range of very low doses. The basic premise of the theory presented is that the low-dose effect cannot be explained by direct damage ......

Lazar Kh. Eidus

2000-09-01T23:59:59.000Z

344

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Boston Massachusetts: Solar in Action (Brochure), Solar America Cities, Energy Efficiency &...

345

Local Action – Planning and Implementation  

Science Journals Connector (OSTI)

In its recently published Strategic Research Agenda the European wind energy platform, TPWind, proposes an ambitious vision ... Europe. In this vision, 300 GW of wind energy capacity will be implemented by 2030, ...

Maryke van Staden; Francesco Musco

2010-01-01T23:59:59.000Z

346

{Thought in Action} facultyminds photosbystevekuzma  

E-Print Network (OSTI)

entrepreneurs bring to society. The healthcare debate is a good example. Many advances in health- care of desperate flailing, hoping to cut healthcare costs. Some of the proposed reforms eliminate the incentives

Shyy, Wei

347

Restructuring proposed for Mexico's Pemex  

SciTech Connect

Mexican President Carlos Salinas de Gortari soon will send a legislative proposal to Congress that splits state owned Petroleos Mexicanos into four subsidiaries. This paper reports that Pemex functions will be divided into Pemex Exploration Production, Pemex Refining, Pemex Gas Basic Petrochemicals, and Pemex Secondary Chemicals. An earlier report the the company would be split into seven units. Each of the four new operating companies will be an independent business unit with a separate board of directors and its own staff and support functions.

Not Available

1992-06-22T23:59:59.000Z

348

Monitoring and Tracking Long-Term Finance to Support Climate Action | Open  

Open Energy Info (EERE)

Monitoring and Tracking Long-Term Finance to Support Climate Action Monitoring and Tracking Long-Term Finance to Support Climate Action Jump to: navigation, search Tool Summary Name: Monitoring and Tracking Long-Term Finance to Support Climate Action Agency/Company /Organization: Organisation for Economic Co-Operation and Development (OECD) Sector: Energy, Climate Topics: Finance, GHG inventory Resource Type: Publications, Lessons learned/best practices Website: www.oecd.org/dataoecd/57/57/48073739.pdf Cost: Free Monitoring and Tracking Long-Term Finance to Support Climate Action Screenshot References: Monitoring and Tracking Long-Term Finance to Support Climate Action[1] "This paper highlights the relevant information that needs to be tracked in order to build a comprehensive MRV system for climate finance, proposing

349

ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED ENERGY CONSERVATION STANDARD FOR REFRIGERATORS, REFRIGERATOR-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ASSESSMENT FOR THE PROPOSED ENERGY ASSESSMENT FOR THE PROPOSED ENERGY CONSERVATION STANDARD FOR REFRIGERATORS, REFRIGERATOR- , AND FREEZERS - 1. INTRODUCTION AND NEED FOR PROPOSED ACTION ental Assessment (EA) on the candidate energy conservation stand licy Act. of 1969 (NEPA), regulations of the Council on Environmentd Qu refrigerators, re€iigerator-freezers, and freezers was prepared pursuant to the National ' ederal Regulations, Parts 1500 through. 1508. The proposed energy conservation standard (Level 1) and the alternative standards are being reviewed in an energy- efficiency standards rulemaking that the Department has undertaken pursuant to the Energy Policy and Conservation Act, as amended by the National Energy Conservation Policy Act and the National Appliance Energy Consehation Act

350

DOE/EA-1295: Environmental Assessment for the Proposed Decontamination and Decommissioning of Building 301 Hot Cell Facility at Argonne National Laboratory (09/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 95 ENVIRONMENTAL ASSESSMENT PROPOSED DECONTAMINATION AND DECOMMISSIONING OF BUILDING 301 HOT CELL FACILITY AT ARGONNE NATIONAL LABORATORY U. S. Department Of Energy Chicago Operations Office September, 2000 ii TABLE OF CONTENTS LIST OF TABLES iv LIST OF FIGURES iv ACRONYMS v 1.0 BACKGROUND 1 1.1 Facility Description and History 1 1.2 Current Status 7 2.0 PURPOSE AND NEED 7 3.0 DESCRIPTION OF PROPOSED ACTION AND NO ACTION ALTERNATIVE 8 3.1 The Proposed Action 8 3.2 No Action Alternative 10 4.0 THE AFFECTED ENVIRONMENT 11 4.1 Site Description 11 4.2 Cultural Resources 11 4.2.1 Archaeological Sites 11 4.2.2 Historical Structures and Objects 11 4.3 Air Quality 11 5.0 ENVIRONMENTAL CONSEQUENCES OF THE PROPOSED ACTION 12 5.1 Environmental Impacts of Decontamination and Demolition 12 5.1.1 Sensitive Resources

351

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

352

Dynamo action in flows with  

E-Print Network (OSTI)

Dynamo action in flows with cat's eyes A l i c e C o u r v o i s i e r A n d r e w G i l b e r t Y of k for R = 500 and the flow (2.4) and (2.5). nts k = 2.5 and k = 5 are highlighted. Magnetic field). In (a) k = 2.5 and we have 0.5 max Bz (with max Bz 0.6 max |B|), and in (b) k = 5 and the levels .65 max

Li, Yi

353

Numerical Tests of the Improved Fermilab Action  

E-Print Network (OSTI)

Recently, the Fermilab heavy-quark action was extended to include dimension-six and -seven operators in order to reduce the discretization errors. In this talk, we present results of the first numerical simulations with this action (the OK action), where we study the masses of the quarkonium and heavy-light systems. We calculate combinations of masses designed to test improvement and compare results obtained with the OK action to their counterparts obtained with the clover action. Our preliminary results show a clear improvement.

C. Detar; A. S. Kronfeld; M. B. Oktay

2010-11-23T23:59:59.000Z

354

EIS-0397: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

355

EA-1912: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Mitigation Action Plan EA-1912: Mitigation Action Plan Midway-Benton No. 1 Rebuild Project, neartown of Desert Aire, Benton County, Washington This Mitigation Action Plan (MAP)...

356

Corrective Action Tracking System (CATS) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Tracking System (CATS) Corrective Action Tracking System (CATS) The CATS web-based database is used to enter, track, and report the status of corrective actions...

357

EA-1891: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No...

358

http://www.oha.doe.gov/regs/Proposed708.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

[6450.01P] [6450.01P] DEPARTMENT OF ENERGY 10 CFR PART 708 [RIN 1901-AA78] Criteria and Procedures for DOE Contractor Employee Protection Program AGENCY: Department of Energy ACTION: Notice of proposed rulemaking SUMMARY: The Department of Energy (DOE) proposes amendments for its contractor employee protection program which provides recourse to DOE contractor employees who believe they have been retaliated against for activities such as a disclosure of information regarding management of environmental, safety, health, and other matters, for participating in Congressional proceedings, or for refusing to engage in illegal or dangerous activities. DATES: Written comments should be forwarded not later than ____________ [insert the date 60 days from date of this FR

359

Proposed Multi-step DOE NIETC Designation Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DOE Technical Conference - Mike Heyeck - AEP VP, Transmission 1 Proposed Multi-Step DOE NIETC Designation Process Proposed Multi-Step DOE NIETC Designation Process 1) DOE designates NIETCs that exhibit significant congestion and reliability problems in studies or per request and delegates to FERC siting process for action according to statute. 2) RTOs, ISOs or individual TOs determine the optimal solution to alleviate the problems identified above. 3) DOE designates NIETCs if transmission solutions are found that are not designated NIETCs per step 1. 4) State and local agencies fully engage with transmission developers on siting requirements including environmental impact studies. DOE delegates its lead agency role to FERC for federal lands and areas not covered by state and local siting requirements.

360

Part 3: Removal Action | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Removal Action 3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous substances that pose a threat of release the threat of migration of the hazardous substances the threat of fire or explosion the availability of an appropriate Federal or State response capability [section 300.415(b)(2)]. In essence, where DOE identifies a threat of exposure to or migration of

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Microsoft Word - Mitigation Action Plan master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project DOE/EA-1591 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. This MAP is for the Proposed Action and includes all integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. No impacts reached the level to be considered significant even without these mitigation measures.

362

NE-24 Unlverslty of Chicayo Remedial Action Plan  

Office of Legacy Management (LM)

(YJ 4 tlsj .?I2 (YJ 4 tlsj .?I2 416 17 1983 NE-24 Unlverslty of Chicayo Remedial Action Plan 22&d 7 IA +-- E. I.. Keller, Director Technical Services Division Oak Ridge Operations Ufflce In response to your memorandum dated July 29, 1983, the Field Task Proposal/Agreement (FTP/A) received frw Aryonne National Laboratory (ANL) appears to be satisfactory, and this office concurs in the use of ANL to provide the decontamination effort as noted in the FTP/A. The final decontaminatton report should Include the data needed for certiff- cation of the cleanup and any contamination left In place, e.g., sewer lines should be so documented in the permanent records of the University as well as the certification documents and reports. The remedial action to be conducted appears to be clearly InsIgnifIcant from an environmental

363

Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.

DOE /NV

1998-12-08T23:59:59.000Z

364

Proposal Guidance for Fiscal Year 2014 | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

capability web pages. An EMSL user proposal requires detailed information for a thorough peer and management review. The Proposal Planning document (.pdf) will walk you through...

365

Proposal Submittal and Scheduling Procedures for Macromolecular...  

NLE Websites -- All DOE Office Websites (Extended Search)

obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL...

366

Proposal Submittal and Scheduling Procedures for Macromolecular  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal Forms New Proposal Request Form (note: you must be a registered user to submit a proposal through our User Portal. Click on "Become a New User" link to register.) Extension Application for Macromolecular Crystallography Proposals Rapid Access Application Form Types of Proposals Proposals should be submitted under one of the following classifications.

367

JGI - How to Propose a CSP Project  

NLE Websites -- All DOE Office Websites (Extended Search)

How to Propose a CSP Project How to Propose a CSP Project CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ How do I submit my proposal? Proposals for synthetic biology and small-scale microbial and metagenome projects may be submitted at any time as brief white papers and will be reviewed every six months. Deadline for submission is 60 days prior to the review. See proposal schedule for specific dates. Submit a small-scale microbial/metagenome or synthetic biology proposal For the CSP15 annual call, a letter of intent is required to submit a proposal to JGI. Submitters whose letters of intent/proposals are approved will receive further instructions via email. Submit a CSP annual proposal For the CSP15 JGI-EMSL joint call, a letter of intent is required to submit

368

DOE Standards Actions, November 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Projects Canceled DOE Projects Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Worker Protection for Uranium Facilities, Project Number SAFT-0058; Peter O’Connell, EH-52; 301-903-5641, Peter .O’Connell@eh.doe.gov. This project was superceded by Guide of Good Practices for Oc- cupational Radiological Protec- tion in Uranium Facilities, Project Number SAFT-0072. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with copies for comment. The full text of these documents are available on the Technical Standards Pro- gram (TSP) Web Site at the URL shown at the bottom of this page.

369

EM International Program Action Table  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 E M I n t e r n a t i o n a l P r o g r a m s Page 1 ACTION TABLE Subject Lead Office Engaging Country Meeting Location Purpose Status Date of Event 3 rd US/German Workshop on Salt Repository Research, Design and Operations N. Buschman, EM-22 Germany Albuquerque & Carlsbad, NM Continue collaboration with Germans on salt repository research, design and operations. Draft agenda prepared. October 8-12, 2012 International Framework for Nuclear Energy Cooperation (IFNEC) Ministerial R. Elmetti, EM- 2.1 Multilateral Marrakech, Morocco To support the development of nuclear energy infrastructure globally through workforce training, information sharing, and approaches related to the safe, secure and responsible use of

370

The Standards Actions, August 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standard project was recently can- standard project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Guidelines for Preparing Criti- cality Safety Evaluations at De- partment of Energy Non-Reac- tor Nuclear Facilities, Project Number SAFT-0069; Jerry McKamy, EH-34, 301-903-8031, Jerry. McKamy@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Tritium Handling and Safe Storage, Project Number SAFT-0054;

371

The Standards Action - April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Canceled Projects Canceled The following DOE technical standard project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Seismic Design and Evaluation Guidelines for High-Level Waste Storage Tanks, 6910-0035; Owen Thompson, EM-38, 301- 903-1926, FAX 301-903-7604, Owen.Thompson@em.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Stabilization, Packaging, and Storage of Plutonium-Bearing

372

The Standards Actions February 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Technical Standards Program Document Status as of 1/31/96 In Preparation 5 7 Out for Comment 2 1 Total in process = 78 Published in Past 30 Days 0 In Conversion 2 3 Projects Initiated The following DOE technical standards projects were recently initiated. If you are interested in participating in the development of these standards, please contact the persons listed below. * Handbook for the Department of Energy Laboratory Accreditation Program for Radiobioassay, Project No. SAFT-0049; Robert Loesch, EH-52; 301-903- 4443, Email, loesch@viper.eh.doe.gov. * Guide to Good Practices for Training and Qualification of Instructors, Project No. 6910-0051; Ken L Maier, EH-31; 208-526- 9178, FAX 208-526-9650, Email, klm4@inel.gov. * Guide to Good Practices for Training and Qualification of

373

Memorandum: Emergency Actions and NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2005 8, 2005 MEMORANDUM FOR FEDERAL NEPA CONTACTS FROM: HORST G. GRECZMIEL Associate Director for NEPA Oversight SUBJECT: Emergency Actions and NEPA This memorandum provides: * General information on the response to Katrina * Reporting oil and chemical spills * Projected long term recovery efforts * How agencies can respond to emergencies and comply with NEPA. Please distribute this memorandum to your agency planning and environmental personnel. General information on the response to Katrina: Information is available on the FEMA website at http://www.fema.gov and specifics on the government's response are provided at the "What Government is Doing" link which can be directly accessed at http://www.dhs.gov/dhspublic/interapp/editorial/editorial_0712.xml

374

The Standards Actions, February 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standards project was recently can- standards project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Software Quality Assurance Requirements, Procedures, and Guidelines, Project QCIC-0008; Burton Rothleder, EH-31, 301- 903-3726, FAX 301-903-9523, Burton.Rothleder@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of these documents is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on these documents, please notify your TSM. • DOE Handbook Design Considerations, Project Number EDCN-0001; Richard Stark, EH-31; 301-903-4407, FAX 301-

375

Lawrence Berkeley Laboratory Affirmative Action Program. Revised  

SciTech Connect

The Lawrence Berkeley Laboratory`s Affirmative Action Program (AAP) serves as a working document that describes current policies, practices, and results in the area of affirmative action. It represents the Laboratory`s framework for an affirmative approach to increasing the representation of people of color and women in segments of our work force where they have been underrepresented and taking action to increase the employment of persons with disabilities and special disabled and Vietnam era veterans. The AAP describes the hierarchy of responsibility for Laboratory affirmative action, the mechanisms that exist for full Laboratory participation in the AAP, the policies and procedures governing recruitment at all levels, the Laboratory`s plan for monitoring, reporting, and evaluating affirmative action progress, and a description of special affirmative action programs and plans the Laboratory has used and will use in its efforts to increase the representation and retention of groups historically underrepresented in our work force.

NONE

1995-06-01T23:59:59.000Z

376

A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes  

SciTech Connect

This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

Not Available

1994-02-01T23:59:59.000Z

377

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Action Codes Table | National Nuclear Security Administration Action Codes Table | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Action Codes Table Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Code Tables > Action Codes Table

378

California Climate Action Registry | Open Energy Information  

Open Energy Info (EERE)

Place: Los Angeles, California Zip: 90014 Product: Los Angeles-based NPO which develops GHG reporting standards and tools for organisations. References: California Climate Action...

379

Energy Action Month | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and water that can help you meet critical agency mission goals, see Federal Energy and Water Management Awards to read about model Federal projects. During Energy Action Month...

380

Recessive and Dominant Gene Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Recessive and Dominant Gene Action Recessive and Dominant Gene Action Name: Katie Location: N/A Country: N/A Date: N/A Question: What Causes some genes to be ressesive and other genes to be dominant? Replies: Think about the fact that genes code for directions for making proteins. There are many different kinds of proteins in our body-enzymes for regulating metabolism, structural proteins for building our bodies, hormones for regulating processes etc. If the gene for the protein is structural, then it is important to have the right kind and the right amount. If the gene is defective (usually recessive genes are defective, but not always) the right protein will not be made and the structure will either be defective and won't work at all or there won't be enough to maintain the structure. Sometimes you need both genes to be working to get enough of the structure. So a homozygous person will have the strongest structure. A heterozygote would have one gene that is working a may produce enough of the protein to maintain the structure, but maybe not. So in some cases, just having one copy of the dominant (working) gene is enough. If it is a trait for something like eye color, this is not going to cause a defect, just a difference. In this case, being heterozygous or homozgyous for the dominant trait produces the same color of eye. In the case of sickle cell anemia, the recessive gene changes the protein structure of the shape of the red blood cell. If you have one good copy and one bad copy of the gene, some of your cells will be normal and some will be sickle cells. One good copy of the gene gives you enough normal red blood cells to stay healthy. But if you don't have a normal copy, all of your cells have the capability to sickle under certain conditions and this can be fatal. So think of dominant and recessive genes in terms of what they produce and what that protein is supposed to do and then think of what would happen if the dominant gene was able to overtake the effect of the recessive gene.

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Proposal Review Panel | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Proposal Review Panel Submitting a proposal is the first step to access beam time at SSRL. Proposals are peer reviewed and rated by the SSRL Proposal Review Panel (PRP) on a scale from 1 (highest) to 5 (lowest). Successful proposals are eligble to request and may be awarded beam time on SSRL beam lines, with priority given to the highest rated proposals and those which demonstrate efficient and productive use of beam time. We have three proposal calls per year with one on-site PRP meeting at SSRL annually. Access Policy The work of the PRP is accomplished with four subpanels: BIO - The biology panel reviews proposals requesting beam time for imaging, X-ray spectroscopic studies, small-angle scattering experiments, and crystallography of biologically important samples.

382

Robotic actions in the human brain Robotic movement preferentially engages the action observation network  

E-Print Network (OSTI)

Robotic actions in the human brain 1 Robotic movement., Stadler, W. & Prinz, W. (in press / 2011). Robotic movement preferentially engages the action observation network. Human Brain Mapping. #12;Robotic

Hamilton, Antonia

383

NSR&D Call for Proposals 2015  

Energy.gov (U.S. Department of Energy (DOE))

The Call for Proposals memorandum represents the official 2015 Call for Proposals for the Department of Energy (DOE) Nuclear Safety Research and Development (NSR&D) Program. The purpose of the Call for Proposals is to identify potential projects addressing cross-cutting nuclear safety issues across the DOE complex. Also included are the Proposal Submittal Instructions and Review and Prioritization of Submitted Proposals. The latter document, which describes the criteria and process that the NSR&D Committee will use to evaluate proposals, is included to help delineate the types of potential projects that are of greatest interest to the NSR&D Program.

384

Recommendations for Remedial Action at Everest, Kansas.  

SciTech Connect

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE). This document suggested possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE included the following: (1) Hydraulic control by groundwater extraction with aboveground treatment; (2) Air sparging-soil vapor extraction (SVE) in large-diameter boreholes; and (3) Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to the proposed CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a); (2) A field investigation in early 2006 (Argonne 2006c), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property; (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing contaminant plume; and (c) Resampling of all existing permanent monitoring points for VOCs and biodegradation parameter analyses, at the request of the KDHE. On the basis of these studies (Argonne 2006a,c) and the CCC/USDA's past investigations at Everest (Argonne 2006b), the CCC/USDA concluded that groundwater extraction is not an effective remedial option for this site, and the KDHE concurred (KDHE 2006). As outlined in the next section, the CCC/USDA also believes that air sparging does not represent a viable remedial alternative. The CCC/USDA therefore proposes to collect the technical data required to evaluate the potential viability of a phytoremediation approach for this site and, if appropriate, to support the development of a remedial design.

LaFreniere, L. M. (Environmental Science Division)

2007-02-15T23:59:59.000Z

385

Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action |  

NLE Websites -- All DOE Office Websites (Extended Search)

Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action November 23, 2010 - 6:34pm Addthis The Department of Energy has settled the civil penalty action it initiated against Air-Con International for Air-Con's sale of air conditioners in the United States that used more energy than allowed by federal law. On September 20, 2010, based on Air-Con's responses to a DOE subpoena, DOE ordered Air-Con to stop selling noncompliant air conditioners in the United States and proposed civil penalties for the noncompliant units sold by the company. Air-Con promptly ceased U.S. sales of the noncompliant models. In the settlement announced today, DOE agreed to accept a civil penalty of $10,000, after considering factors set forth in DOE's penalty guidance,

386

Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action Air-Con Agrees to Pay Civil Penalty to Resolve Enforcement Action November 23, 2010 - 6:34pm Addthis The Department of Energy has settled the civil penalty action it initiated against Air-Con International for Air-Con's sale of air conditioners in the United States that used more energy than allowed by federal law. On September 20, 2010, based on Air-Con's responses to a DOE subpoena, DOE ordered Air-Con to stop selling noncompliant air conditioners in the United States and proposed civil penalties for the noncompliant units sold by the company. Air-Con promptly ceased U.S. sales of the noncompliant models. In the settlement announced today, DOE agreed to accept a civil penalty of $10,000, after considering factors set forth in DOE's penalty guidance,

387

EA-1858: DOE Notice of Availability and Notice of Floodplain Action |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: DOE Notice of Availability and Notice of Floodplain Action 8: DOE Notice of Availability and Notice of Floodplain Action EA-1858: DOE Notice of Availability and Notice of Floodplain Action Nippon Paper Industries USA Company Biomass Cogeneration Project, Port Angeles, Washington The U.S. Department of Energy (DOE) is proposing to provide American Reinvestment and Recovery Act federal funding to the Washington Department of Commerce under the State Energy Program to Nippon Paper Industries USA Company to construct and operate a new biomass-fueled cogeneration facility in Port Angeles, Washington. Notice of Availability and Notice of Floodplain Action: Nippon Paper Industries USA Company Biomass Cogeneration Project, Port Angeles, Washington DOE/EA 1858 More Documents & Publications EA-1858: Finding of No Significant Impact

388

Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4  

SciTech Connect

This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

A. M. Tyson

2006-08-01T23:59:59.000Z

389

EIS-0030-S: Bonneville Power Administration Proposed FY 1980 Program, Facility Location Supplement, Northwest Montana/North Idaho Support and Libby Integration, Supplemental  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this supplemental statement to evaluate the environmental impacts of proposed alternative actions to alternative actions intended to address the need for reliability of electrical service to loads in Northwest Montana and North Idaho and the need for integrating the generation being added at Libby Dam into the Federal Columbia River Power System.

390

March 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2007 March 2007 Continued on next page TSP Manager's Notes 1 Domestic Programs (American National Standards) Overview 2 Aerospace Industry Advocates Standards Selection Based on Technical Merit, Not Semantics 3 Report Recommends Withdrawal of OMB Risk Assessment Bulletin 4 Technical Standards Manager Spotlight 5 Topical Committee Developments 6 Welcome Aboard the TSMC! 7 Standards Actions 8 DOE Standards Actions 8

391

December 2006 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2006 December 2006 TSP Manager's Notes 1 Meeting In The Middle 2 Plain Talk for a New Generation 3 Licensing New Nuclear Power Plants 4 ANSI Government Affairs Overview 5 Technical Standards Manager Spotlight 7 Topical Committee Developments 8 Welcome Aboard the TSMC! 8 Standards Actions 9 DOE Standards Actions 9

392

Group actions on twin buildings Peter Abramenko  

E-Print Network (OSTI)

Group actions on twin buildings Peter Abramenko Introduction Though parts of the present paper sense) for the action of G(k[t, t-1 ]) on the product + � - of the two associated Bruhat�Tits buildings 4 also yielded a preliminary version of Lemma 2 involving both affine buildings + and -. Thus I

Chapman, Robin

393

Open government partnership: Argentina action plan  

Science Journals Connector (OSTI)

In 2009, Iberoamerican countries signed the Charter of Citizen Participation in Public Administration. Well in advance in 2003, the Argentinean Government issued a decree ensuring freedom of information. Based on such decree and fulfilling the commitments ... Keywords: argentina action plan, government action plan, open government, public policies

Pedro Janices; Natalia Aguerre

2013-10-01T23:59:59.000Z

394

produced misleading evidence about the mechanism of action of the enzymes.  

E-Print Network (OSTI)

produced misleading evidence about the mechanism of action of the enzymes. The reactivity of the d of enzymes. Koehn et al.1 propose that a third component of FDTS reactions, the `FADH2 cofactor enzymes (see Fig. 1c on page 920). The authors found evidence for this theory by introducing hydrogen

395

Sensory invariance driven action (SIDA) framework for understanding the meaning of neural spikes  

E-Print Network (OSTI)

on an approach which regards action as necessary for acquiring the meaning of neural spikes. This approach differs from some others in that it proposes a new criterion called the sensory invariance criterion, which can be used to associate meaning to spike...

Bhamidipati, Sarvani Kumar

2004-09-30T23:59:59.000Z

396

Climate Protection Action Fund | Open Energy Information  

Open Energy Info (EERE)

Action Fund Action Fund (Redirected from The Climate Protection Action Fund) Jump to: navigation, search Logo: The Climate Protection Action Fund Name The Climate Protection Action Fund Address 901 E Street, NW Suite 610 Place Washington, District of Columbia Zip 20004 Website http://www.climateprotectionac Coordinates 38.896398°, -77.024192° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.896398,"lon":-77.024192,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

397

Energy Action Month | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Outreach » Energy Action Month Services » Outreach » Energy Action Month Energy Action Month October 7, 2013 - 4:43pm Addthis The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future. Empower Leadership One individual can empower collaboration and teamwork that can spark change and result in sustainable solutions. Empower coworkers, groups, and entire organizations to lead by example, build momentum, and make a difference. Empower Innovation Innovative thinking can guide strategic sustainability plans, generate new best practices, and accelerate the deployment of clean energy technologies.

398

Call for Research Proposals January 13, 2011  

E-Print Network (OSTI)

should contact Prof. Jon Chase, Director (jchase@wustl.edu). For proposals focused on the Clean Coal

Subramanian, Venkat

399

Corrective Action Decision Document for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Decision Document has been prepared for the Nevada Test Site's Area 23 Mercury Fire Training Pit (Corrective Action Unit 342) in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996). Corrective Action Unit 342 is comprised of Corrective Action Site 23-56-01. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for Corrective Action Unit 342. The scope of this document consists of the following: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for the Corrective Action Unit.

DOE /NV

1999-05-26T23:59:59.000Z

400

Enforcement Action 2003-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, DC 20585 Washington, DC 20585 September 3, 2003 Dr. Michael R. Anastasio [ ] Lawrence Livermore National Laboratory P.O. Box 808, L-001 Livermore, CA 94551-0808 EA-2003-04 Subject: Preliminary Notice of Violation and Proposed Civil Penalty $137,500 (Waived by Statute) Dear Dr. Anastasio: This letter refers to the recent investigation by the Department of Energy's Office of Price-Anderson Enforcement (OE) of the June 2002 extremity radiological overexposure event in [ ]. An Investigation Summary Report describing the results of that review was issued to you on May 15, 2003. An Enforcement Conference was held on June 23, 2003, in Germantown, Maryland, with members of your staff to discuss these findings. A Conference Summary Report is enclosed.

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Enforcement Action 2002-05  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Nuclear Security Administration National Nuclear Security Administration Washington, DC 20585 December 17, 2002 Dr. John Browne [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 EA-2002-05 Subject: Preliminary Notice of Violation and Proposed Civil Penalty $220,000 (Waived by Statute) Dear Dr. Browne: This letter refers to the recent investigation by the Department of Energy (DOE)/ National Nuclear Security Administration (NNSA) of the unauthorized staging and storage of transuranic (TRU) waste in PF-185 from March 1996 until June 2001. Following consultation with my office, the Department's Office of Price-Anderson Enforcement (OE) initiated an investigation in March 2002. The scope of the investigation included: (1) failures leading to the establishment of an unauthorized

402

EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Proposed Changes to Parcel ED-1 Land Uses, Utility 6: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee SUMMARY NOTE: This EA has been cancelled. This EA will evaluate the environmental impacts of DOE's proposed modifications to the allowable land uses, utility infrastructure, and Natural Area management responsibility for Parcel ED-1. The purpose of the modifications is to enhance the development potential of the Horizon Center business/industrial park, while ensuring protection of the adjacent Natural Area. The area addressed by the proposed action was evaluated for various industrial/business uses in the

403

Proposed changes for part N of suggested state regulations  

SciTech Connect

This paper discusses proposed changes for Part N regulations regarding naturally occuring radioactive materials. It describes the work of the Commission on NORM of the Conference of Radiation Control Program Directors (CRCPD), toward adjusting the regulations. A set of questions was formulated and a review panel established to address these questions and come back with recommended actions. The panel recommended the distinction that the material being regulated is `Technologically Enhanced Naturally Occurring Radioactive Material` (TENORM). By this they mean `naturally occurring radioactive material not regulated under the Atomic Energy Act (AEA) whose radionuclide concentrations have been increased by or as a result of human practices.` Recommendations also include: using a dose based instead of concentration based standard; refined definition of exemptions from regulations; exclusion of radon from Total Effective Dose Equivalent (TEDE) calculations; provide states flexibility in implementation; inclusion of prospective remedial and operations aspects for TENORM; provision of institutional controls.

Paris, R.

1997-02-01T23:59:59.000Z

404

Corrective Action Investigation Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Air port Strainer Box, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan contains the US Department of Energy, Nevada Operation Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 230/320 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 230 consists of Corrective Action Site (CAS) 22-03-01, Sewage Lagoon; while CAU 320 consists of CAS 22-99-01, Strainer Box. These CAUs are referred to as CAU 230/320 or the Sewage Lagoons Site. The Sewage Lagoons Site also includes an Imhoff tank, sludge bed, and associated buried sewer piping. Located in Area 22, the site was used between 1951 to 1958 for disposal of sanitary sewage effluent from the historic Camp Desert Rock Facility at the Nevada Test Site in Nevada. Based on site history, the contaminants of potential concern include volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPH), and radionuclides. Vertical migration is estimated to be less than 12 feet below ground surface, and lateral migration is limited to the soil immediately adjacent to or within areas of concern. The proposed investigation will involve a combination of field screening for VOCs and TPH using the direct-push method and excavation using a backhoe to gather soil samples for analysis. Gamma spectroscopy will also be conducted for waste management purposes. Sampling locations will be biased to suspected worst-case areas including the nearby sludge bed, sewage lagoon inlet(s) and outlet(s), disturbed soil surrounding the lagoons, surface drainage channel south of the lagoons, and the area near the Imhoff tank. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, Nevada Operations Office

1999-06-10T23:59:59.000Z

405

Corrective Action Investigation Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operation Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 230/320 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 230 consists of Corrective Action Site (CAS) 22-03-01, Sewage Lagoon; while CAU 320 consists of CAS 22-99-01, Strainer Box. These CAUs are referred to as CAU 230/320 or the Sewage Lagoons Site. The Sewage Lagoons Site also includes an Imhoff tank, sludge bed, and associated buried sewer piping. Located in Area 22, the site was used between 1951 to 1958 for disposal of sanitary sewage effluent from the historic Camp Desert Rock Facility at the Nevada Test Site in Nevada. Based on site history, the contaminants of potential concern include volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPH), and radionuclides. Vertical migration is estimated to be less than 12 feet below ground surface, and lateral migration is limited to the soil immediately adjacent to or within areas of concern. The proposed investigation will involve a combination of field screening for VOCs and TPH using the direct-push method and excavation using a backhoe to gather soil samples for analysis. Gamma spectroscopy will also be conducted for waste management purposes. Sampling locations will be biased to suspected worst-case areas including the nearby sludge bed, sewage lagoon inlet(s) and outlet(s), disturbed soil surrounding the lagoons, surface drainage channel south of the lagoons, and the area near the Imhoff tank. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

US DOE/Nevada Operations Office

1999-06-10T23:59:59.000Z

406

Climate Action Plan (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Michigan) Climate Action Plan (Michigan) Climate Action Plan (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Michigan Program Type Climate Policies Provider Michigan Department of Environmental Quality On November 14, 2007, Governor Jennifer M. Granholm issued Executive Order

407

Rem&al Action Performed  

Office of Legacy Management (LM)

Rem&al Action Performed Rem&al Action Performed at the B&T Metals Site in * Columbus, Ohio Department of Energy Office of Assistant Manager for Environmenta/ Management Oak Ridge Operations June 2007 Printed on recycled/recyclable paper. 1.41 2503.2 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PER-FORMED AT THE B&T METALS SITE IN COLUMBUS, OHIO JUNE 200 1 Prepared for United States Department of Energy Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 B&TFinal 6/2001 CONTENTS FIGURES ..................................................................................................................................................... iv ACRON-YhiS ...............................................................................................................................................

408

Climate Action Plan (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Climate Policies Provider MN Deparment of Commerce Recognizing the implications that global climate change may have on the

409

Climate Action Plan (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Climate Policies Provider Department of Environmental Protection The Office of Pollution Prevention and Energy Assistance works with

410

Climate Action Plan (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Montana) Climate Action Plan (Montana) Climate Action Plan (Montana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Montana Program Type Climate Policies Provider Department of Environmental Quality Recognizing the profound implications that global warming and climate variation could have on the economy, environment and quality of life in Montana, the Climate Change Advisory Committee (CCAC) was established with

411

Climate Action Plan (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Climate Policies Provider University of Wisconsin In April 2007, Governor Doyle signed Executive Order 191 which brought

412

Page 1 of 7 Call for Proposals  

E-Print Network (OSTI)

, the Alexander von Humboldt Foundation, the German Academic Exchange Service and the Fraunhofer) as part of the initiative 'Promote Innovation and Research in Germany'. #12;Page 2 of 7 German Research, specific characteristics of target country) · Originality and innovativeness of the actions (How do

Lübeck, Universität zu

413

Climate Protection Action Fund | Open Energy Information  

Open Energy Info (EERE)

Action Fund Action Fund Jump to: navigation, search Logo: The Climate Protection Action Fund Name The Climate Protection Action Fund Address 901 E Street, NW Suite 610 Place Washington, District of Columbia Zip 20004 Website http://www.climateprotectionac Coordinates 38.896398°, -77.024192° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.896398,"lon":-77.024192,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

414

July/August 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions Standards Actions U.S. Department of Energy Office of Nuclear Safety, Quality Assurance and Environment July/August 2008 Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/techstds/) 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.hss.energy.gov/nuclearsafety/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved

415

President Obama Announces His Climate Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Monday, July 1, 2013 On Tuesday, June 25, in a speech at Georgetown University, President Obama announced his comprehensive plan for steady, responsible action to cut carbon pollution, prepare the Nation for the impacts of climate change, and lead international efforts to address climate change as a global challenge. The Plan builds on significant progress made during the Administration's first term on all of these fronts, including those based on the ongoing scientific work of USGCRP's 13 member-agencies, the Interagency Climate Change Adaptation Task Force in which USGCRP participates, and USGCRP's National Climate Assessment team.

416

National Energy Action Month | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Energy Action Month National Energy Action Month National Energy Action Month October 5, 2012 - 12:24pm Addthis Learn about the President's all-of-the-above energy plan. Matt Compton Deputy Director of Online Content for the Office of Digital Strategy at the White House. Editor's note: This article has been cross-posted from WhiteHouse.gov. October is National Energy Action Month, when Americans are called up to work together, "to achieve greater energy security, a more robust economy, and a healthier environment for our children" -- as President Obama wrote in an official proclamation on Monday. Those goals are the reason that the President is pursuing an all-of-the-above strategy to help the United States achieve energy independence. To give you a better sense of what that means, we've put together a video

417

ACTION SPECTRUM OF THE "SECOND EMERSON EFFECT"  

E-Print Network (OSTI)

at 670 mju in the action spectrum of the "second Emerson effect"' (22, 33), in the green alga Chlorella the fraction of total absorbed light absorbed by the accessory pigments (be it chlorophyll b in Chlorella

Govindjee

418

Bishop's University Energy Efficiency Action Plan  

E-Print Network (OSTI)

. Continuous basis Action 9: Sustainable Development standards for existing buildings. Go green certification from BOMA for existing buildings Bishop's University Sustainable Development policy (ELU Committee January 2008 Government of Quebec, energy strategy, May 2006 Sustainable Development law, 2006 Letter

419

University at Buffalo Climate Action Plan  

E-Print Network (OSTI)

........................................................................................ 2-5 2.3 Opportunities for Improving UB's GHG Inventory......................................... 2-9 2.4 The Impact of Campus Growth on UB's GHG Footprint.............................. 2-11 3 Actions-7 A APPENDICES................................................................................1 A. UB's GHG

Oh, Kwang W.

420

Antiseptics and Disinfectants: Activity, Action, and Resistance  

Science Journals Connector (OSTI)

...mechanism of action and risk assessment. . Fitzgerald K. A. Davies...resistance to preservative systems . Gilbert P. Barber J. Ford...biocides. . Russell, A. D. Assessment of sporicidal activity. Int...indicators for low temperature steam and formaldehyde sterilization...

Gerald McDonnell; A. Denver Russell

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

The University of Connecticut Climate Action Plan  

E-Print Network (OSTI)

The University of Connecticut Climate Action Plan: Guiding the Path toward Carbon Neutrality Storrs ................................................................................................................................143 Cover Photo: University of Connecticut President, Susan Herbst, reaffirms UConn's commitment; Susan Herbst, University of Connecticut President; Gene Likens, Distinguished Visiting Faculty

Holsinger, Kent

422

Assessment of Remedial Actions for Contaminated Sites  

Science Journals Connector (OSTI)

During the investigation in the field of remedial actions on contaminated land, an appropriate concept ... site, an evaluation of the existing alternative remedial techniques is necessary. The comparative evaluat...

Th. Neteler; H. L. Jessberger

1993-01-01T23:59:59.000Z

423

EA-1562-SA-1: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington (Mitigation Action Plan for Phase II Build Out, North Federal Campus, PNNL Site)

424

M-area hazardous waste management facility groundwater monitoring and corrective-action report, First quarter 1995, Volume 1  

SciTech Connect

This report, in three volumes, describes the ground water monitoring and c corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during the fourth quarter 1994 and first quarter 1995. Concise description of the program and considerable data documenting the monitoring and remedial activities are included in the document. This is Volume 1 covering the following topics: sampling and results; hydrogeologic assessment; water quality assessment; effectiveness of the corrective-action program; corrective-action system operation and performance; monitoring and corrective-action program assessment; proposed monitoring and corrective-action program modifications. Also included are the following appendicies: A-standards; B-flagging criteria; C-figures; D-monitoring results tables; E-data quality/usability assessment.

NONE

1995-05-01T23:59:59.000Z

425

December 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum & Standards Actions Page 1 December 2007 The Standards Forum & Standards Actions Page 1 December 2007 Continued on next page Technical Standards Program Manager's Note 1 Teaching Standards Development- Inspiring the Next Generation 2 The EPA Radiation Standard for Spent-Fuel Storage in a Geological Repository 3 Expanded Access to Hydrogen Codes and Standards 4 Really Following the Building Code 6 Technical Standards Manager Spotlight 7

426

FACT SHEET: INTERNATIONAL SMART GRID ACTION NETWORK  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updated on July 23, 2010 Updated on July 23, 2010 1 FACT SHEET: INTERNATIONAL SMART GRID ACTION NETWORK At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched an International Smart Grid Action Network (ISGAN) to accelerate the development and deployment of smart electricity grids around the world. Smart grid will help the world accelerate its transition to clean energy and capture the associated energy- and

427

Universality and ambiguity in fermionic effective actions  

E-Print Network (OSTI)

We discuss an ambiguity in the one-loop effective action of massive fields which takes place in massive fermionic theories. The universality of logarithmic UV divergences in different space-time dimensions leads to the non-universality of the finite part of effective action, which can be called the non-local multiplicative anomaly. The general criteria of existence of this phenomena are formulated and applied to fermionic operators with different external fields.

Guilherme de Berredo-Peixoto; Dante D. Pereira; Ilya L. Shapiro

2012-01-12T23:59:59.000Z

428

Action and Inaction Levels in Pest Management.  

E-Print Network (OSTI)

~AMPHIB THIS MATERIAL MAY NOT BE REMOVED FROl\\11 ,THE LIBRARY Action & Inaction Levels in Pest Management THE TEXAS AGRICULTURAL EXPERIMENT STATION I Nevil le P. Clarke I The Texas A&M University System I ColleQe Station, Texas B-1480 July... 1984 Action and Inaction Levels in Pest Management Winfield Sterling Department of Entomology Texas A&M University and The Texas Agricultural Experiment Station College Station, Texas 77843 Contents Introduction...

Sterling, Winfield

1984-01-01T23:59:59.000Z

429

Talk, No Action On Nuclear Waste Plan  

Science Journals Connector (OSTI)

Talk, No Action On Nuclear Waste Plan ... “Nowhere” was how an exasperated Lt. Gen. Brent Scowcroft, chairman of the Blue Ribbon Commission on America’s Nuclear Future, described the status of the U.S.’s search for a place to store spent commercial nuclear fuel and other radioactive waste. ... Although the blue-ribbon commission had completed its seminal report on nuclear waste in January, Scowcroft noted that action on its recommendations was “nowhere.” ...

JEFF JOHNSON

2012-09-30T23:59:59.000Z

430

Guide for the Submission of Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

GUIDE FOR THE SUBMISSION OF GUIDE FOR THE SUBMISSION OF UNSOLICITED PROPOSALS The National Energy Technology Laboratory (NETL), Pittsburgh Office has operational responsibility of the DOE Unsolicited Proposal (USP) Program. All unsolicited proposals should be forwarded by Email to John N. Augustine at DOEUSP@NETL.DOE.GOV who will serve as the single point of contact for all Department of Energy (DOE) unsolicited proposals. Please direct all unsolicited proposals, abstracts and correspondence to: John N. Augustine, Mail Stop 921-107 Unsolicited Proposal Manager U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 Email: DOEUSP@NETL.DOE.GOV -1- TABLE OF CONTENTS Page Introduction .................................................................................................................................... 3

431

DOE Action Plan Addressing the Electricity Distribution System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION PLAN ACTION PLAN ADDRESSING THE ELECTRICITY DISTRIBUTION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Distribution System 1 Table of Contents INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ................................................................................................ 2 Focus on Distribution .............................................................................................. 3 Roadmap Goals ....................................................................................................... 3 PROCESS OVERVIEW ........................................................................................................... 4

432

EIS-0473: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EIS-0473: Mitigation Action Plan W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This Mitigation Action Plan (MAP)...

433

United States-Japan Joint Nuclear Energy Action Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan United States-Japan Joint Nuclear Energy Action Plan An outline on the United States and Japan's joint nuclear energy action...

434

University Park “STEP-UP” Proposal  

Energy.gov (U.S. Department of Energy (DOE))

University Park “STEP-UP” Proposal: DE-FOA-0000148, from the Tool Kit Framework: Small Town University Energy Program (STEP).

435

Lutron Electronics: Proposed Penalty (2012-SE-3796)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Lutron Electronics Co., Inc. manufactured and distributed noncompliant class A external power supplies in the U.S.

436

Reducing Emissions Through Sustainable Transport: Proposal for...  

Open Energy Info (EERE)

Through Sustainable Transport: Proposal for a Sectoral Approach Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Reducing Emissions Through Sustainable Transport:...

437

Heat Controller: Proposed Penalty (2014-SE-15004)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Heat Controller, Inc. privately labeled and distributed noncompliant room air conditioners in the U.S.

438

Proposal Submittal and Scheduling Procedures Entry Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Research at SSRL X-rayVUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy...

439

Whirlpool: Proposed Penalty (2013-SE-1420)  

Energy.gov (U.S. Department of Energy (DOE))

DOE alleged in a Notice of Proposed Civil Penalty that Whirlpool Corporation manufactured and distributed noncompliant refrigerator-freezers in the U.S.

440

Proposed Agency Information Collection: Federal Register Notice...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54 - Aug. 10, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 154 - Aug. 10, 2011 The Department of Energy (DOE) invites public comment on DOE's...

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Proposed Agency Information Collection: Federal Register Notice...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 - Oct. 7, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 The Department of Energy (DOE) invites public comment on DOE's...

442

2013 Reinvention Fund Request for Proposals 1 2013 Reinvention Fund: Request for Proposals  

E-Print Network (OSTI)

2013 Reinvention Fund Request for Proposals 1 2013 Reinvention Fund: Request for Proposals Building a Living Laboratory for Sustainability at Penn State Reinvention Fund Projects Pre-Proposals Due: October 21, 2013 Full Proposals Due: December 20, 2013 Student Sustainability Innovation Projects Pre

Maranas, Costas

443

Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4  

SciTech Connect

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1994-03-01T23:59:59.000Z

444

US - Brazil Binational Energy Working Group Joint Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US - Brazil Binational Energy Working Group Joint Action Plan US - Brazil Binational Energy Working Group Joint Action Plan brazilactionplan7202010.pdf More Documents &...

445

San Diego, California: Solar in Action (Brochure), Solar America...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Diego, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Diego, California: Solar in Action (Brochure), Solar...

446

San Francisco, California: Solar in Action (Brochure), Solar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure),...

447

Portland, Oregon: Solar in Action (Brochure), Solar America Cities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency...

448

Transition of Long-Term Response Action Management Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transition of Long-Term Response Action Management Requirements Transition of Long-Term Response Action Management Requirements The purpose of this memorandum is to provide you...

449

Urgent Action on Energy Conservation Standards for Residential...  

Energy Savers (EERE)

Urgent Action on Energy Conservation Standards for Residential Water Heaters (Docket Number: EERE-2012-BT-STD-0022) Urgent Action on Energy Conservation Standards for Residential...

450

Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America...  

Energy Savers (EERE)

Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Milwaukee, Wisconsin: Solar in Action (Brochure), Solar America...

451

Denver, Colorado: Solar in Action (Brochure), Solar America Cities...  

Energy Savers (EERE)

Denver, Colorado: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Denver, Colorado: Solar in Action (Brochure), Solar America Cities,...

452

Policy and Procedures for the Review of Federal Actions Impacting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy and Procedures for the Review of Federal Actions Impacting the Environment Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual...

453

President Obama Announces Commitments and Executive Actions to...  

NLE Websites -- All DOE Office Websites (Extended Search)

Obama Announces Commitments and Executive Actions to Advance Solar Deployment and Energy Efficiency President Obama Announces Commitments and Executive Actions to Advance Solar...

454

Burundi-National Adaptation Plan of Action to Climate Change...  

Open Energy Info (EERE)

Burundi-National Adaptation Plan of Action to Climate Change Jump to: navigation, search Name Burundi-National Adaptation Plan of Action to Climate Change AgencyCompany...

455

Ethiopia-Climate Change National Adaptation Programme of Action...  

Open Energy Info (EERE)

Action Jump to: navigation, search Name Ethiopia-Climate Change National Adaptation Programme of Action AgencyCompany Organization United Nations Development Programme, Global...

456

Demand Response and Smart Metering Policy Actions Since the Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Demand Response and Smart Metering Policy Actions Since the...

457

National Action Plan on Demand Response | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Action Plan on Demand Response National Action Plan on Demand Response Presentation-given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008...

458

2005 CHP Action Agenda: Innovating, Advocating, and Delivering...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 CHP Action Agenda: Innovating, Advocating, and Delivering Solutions, October 2005 2005 CHP Action Agenda: Innovating, Advocating, and Delivering Solutions, October 2005 More than...

459

State Opportunities for Action: Update of States' CHP Activities...  

Energy Savers (EERE)

State Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 State Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 This...

460

Berkeley, California: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Berkeley, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Berkeley, California: Solar in Action (Brochure), Solar America...

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Tucson, Arizona: Solar in Action (Brochure), Solar America Cities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Tucson, Arizona: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Tucson, Arizona: Solar in Action (Brochure), Solar America Cities,...

462

Austin, Texas: Solar in Action (Brochure), Solar America Cities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Austin, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Austin, Texas: Solar in Action (Brochure), Solar America Cities, Energy...

463

Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar America...  

Energy Savers (EERE)

Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Pittsburgh, Pennsylvania: Solar in Action (Brochure), Solar...

464

Seattle, Washington: Solar in Action (Brochure), Solar America...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seattle, Washington: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Seattle, Washington: Solar in Action (Brochure), Solar America...

465

Knoxville, Tennessee: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Knoxville, Tennessee: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Knoxville, Tennessee: Solar in Action (Brochure), Solar America...

466

POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for...  

Energy Savers (EERE)

15 Processing Personnel Actions for Details POLICY GUIDANCE MEMORANDUM 15 Processing Personnel Actions for Details The Office of Personnel Management (OPM), effective September...

467

2012 National Energy Assurance Planning Conference After-Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29,...

468

Boston Massachusetts: Solar in Action (Brochure), Solar America...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boston Massachusetts: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Boston Massachusetts: Solar in Action (Brochure), Solar America...

469

Energy Department Actions to Deploy Combined Heat and Power,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

470

Tonopah Test Range Environmental Restoration Corrective Action Sites  

SciTech Connect

This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites and Corrective Action Units at the Tonopah Test Range

NSTec Environmental Restoration

2010-08-04T23:59:59.000Z

471

Two Tribes Recognized as Climate Action Champions During White...  

Office of Environmental Management (EM)

Two Tribes Recognized as Climate Action Champions During White House Tribal Nations Conference Two Tribes Recognized as Climate Action Champions During White House Tribal Nations...

472

EAC Recommendations for DOE Action Regarding Consumer Acceptance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6,...

473

SEE Action Series: Local Strategies for Whole-Building Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Action Network (SEE Action), facilitated by the U.S. Department of EnergyU.S. Environmental Protection Agency. Content does not imply an endorsement by...

474

SEE Action Series: Energy Performance Benchmarking and Disclosure...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Action Network (SEE Action), facilitated by the U.S. Department of EnergyU.S. Environmental Protection Agency. Content does not imply an endorsement by...

475

EIS-0026: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0026: Mitigation Action Plan Waste Isolation Pilot Plant This MAP focuses on mitigation commitments stated in the RODs to the 1980 Final Environmental...

476

United States and Japan Sign Joint Nuclear Energy Action Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy...

477

United States -Japan Joint Nuclear Energy Action Plan | Department...  

Energy Savers (EERE)

United States -Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan President Bush of the United States and Prime Minister Koizumi of Japan...

478

Transcript of See Action and Technical Assistance Program Webcast...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transcript of See Action and Technical Assistance Program Webcast: Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Transcript of See Action and...

479

Corrective Action Tracking System User's Guide | Department of...  

Office of Environmental Management (EM)

September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP)...

480

Stimulating Energy Efficiency Action in States | Department of...  

Energy Savers (EERE)

Stimulating Energy Efficiency Action in States Stimulating Energy Efficiency Action in States During Fiscal Years 2010-2013, the U.S. Department of Energy's (DOE) State Energy...

Note: This page contains sample records for the topic "kewm-4 proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Energy Department Officials Kick Off National Energy Action Month...  

Energy Savers (EERE)

Energy Department Officials Kick Off National Energy Action Month Energy Department Officials Kick Off National Energy Action Month October 3, 2014 - 1:30am Addthis Energy...

482

Energy Literacy in Action: Nevada Teachers Helping Students Learn...  

Office of Environmental Management (EM)

Literacy in Action: Nevada Teachers Helping Students Learn About Energy Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy November 6, 2014 - 10:48am...

483

Implement an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from...

484

Develop an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine...

485

EIS-0422: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

486

EA-1679: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EA-1679: Mitigation Action Plan Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington This MAP is for...

487

San Antonio, Texas: Solar in Action (Brochure), Solar America...  

Energy Savers (EERE)

San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Antonio, Texas: Solar in Action (Brochure), Solar America...

488

E-Print Network 3.0 - actions significant actions Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

should begin work on its Action Team Plan. ... Source: Environmental Protection Agency, Technology Innovation Program (TIP) Collection: Multidisciplinary Databases and Resources...

489

Review of heavy ion collider proposals  

SciTech Connect

In this paper we review proposals for heavy-ion colliders generated during the last few years for several national laboratories. The proposals span over a large range of energy and luminosity to accommodate the experimental needs of both the nuclear and the high-energy physicists. We report also briefly efforts in the same field happening in Europe.

Ruggiero, A.G.

1985-01-01T23:59:59.000Z

490

NASA Asks Scientists For Voyager Proposals  

Science Journals Connector (OSTI)

NASA Asks Scientists For Voyager Proposals ... The primary objective of the mission, NASA says, is to obtain fundamental information about Mars, including the physics and chemistry of the planet body, surface, and atmosphere, with special emphasis on investigations relevant to possible Martian biology. ... NASA says that preliminary proposals should be submitted by Aug. 1, 1965. ...

1965-06-21T23:59:59.000Z

491

Proposal/Grant Writing: Planning, Writing, Reviewing  

E-Print Network (OSTI)

Proposal/Grant Writing: Planning, Writing, Reviewing December 7th, 2010 #12;Presentation Overview ·General Proposal Writing Planning for success Writing Reviewing ·Specifics for non-governmental funding agencies ·Resources available at Michigan Tech to help you 2 #12;Planning 3 #12;Larger Context ·Research

492

Proposal for the Cryogenic Supply of a  

E-Print Network (OSTI)

1 Proposal for the Cryogenic Supply of a Single TTF / FEL - Cryomodule Test Bench TESLA Report No for the test of single TTF/FEL-cryomodules is proposed. The general equipment and the layout of the cryogenic the necessity of experimental investigations of fault conditions for TESLA cryogenic components in line

493

Proposal Preparation at a Glance Planning Ahead  

E-Print Network (OSTI)

I Need to Provide to ORA? 1. A budget in the standard CSM format. Use our template at http://inside.minesProposal Preparation at a Glance Planning Ahead Indirect Cost Exceptions Read your proposal website at: http://inside.mines.edu/Research_Administration under "What's New." Cost Sharing

494

NETL: Guide for Preparation of Cost Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

and Business Opportunities and Business Opportunities Guide for Preparation of Cost Proposals The following guide is to be used in the preparation of the offeror's cost proposal. It provides general instructions as well as the format, exhibits and content that is required to be included in the submission. In addition, the exhibits include examples of both cost elements and indirect rate data that are in typical proposals. Please note that these are provided as a guide only. Do not attempt to conform your proposal to match the exact elements and accounts in the examples. Both the cost elements and indirect rate data in your proposal should be able to be traced to and supported by your accounting system. Any questions should be directed to the contact person noted in the instructions.

495

Microsoft Word - Call_for_Proposals.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

The University of Chicago The University of Chicago ATLAS Call for Proposals Deadline for proposals: Monday, October 28, 2013 Dear ATLAS User, This is a call for proposals for experiments at ATLAS, for the scheduling period beginning in January 2014. The ATLAS Program Advisory Committee (PAC) meeting will be held November 22-23, 2013. Please note that this is a call for proposals for all experiments using stable beams, radioactive beams produced by the in-flight technique, and low-energy and reaccelerated radioactive beams from the CARIBU source. This is also the first call for proposals for experiments with the GRETINA gamma-ray tracking array that will be operational at ATLAS from January 2014 to December 2014. GRETINA operation at ATLAS is expected to be split into two campaigns. GRETINA's first campaign at ATLAS will have it sited on the

496

DOE/EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER  

NLE Websites -- All DOE Office Websites (Extended Search)

EA-1606 EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER SITE LANDS FOR MILITARY TRAINING December 2011 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE DOE/EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER SITE LANDS FOR MILITARY TRAINING December 2011 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii This page is intentionally left blank iii TABLE OF CONTENTS PAGE 1.0 INTRODUCTION ...................................................................................................1 1.1 Background ..................................................................................................1 1.2 Purpose and Need for Action .......................................................................3

497

EA-1376: Proposed Construction and Operation of a New Interagency Emergency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

376: Proposed Construction and Operation of a New Interagency 376: Proposed Construction and Operation of a New Interagency Emergency Operations Center at Los Alamos National Laboratory, Los Alamos, NM EA-1376: Proposed Construction and Operation of a New Interagency Emergency Operations Center at Los Alamos National Laboratory, Los Alamos, NM SUMMARY The Proposed Action is the construction and operation of a new Interagency Emergency Operations Center (Center) at Technical Area 69. The new Center would include a 30,000-square-foot (2,700-square-meter) facility, a garage, a 130-car parking lot, and a 150-foot (45-meter) tall fire suppression water storage tank with antenna attachments on about a 5-acre (2-hectare) site. The new Center would be designed as a state-of-the-art multi-use facility housing about 30 fulltime University of California and Los Alamos

498

Environmental Assessment for the Proposed Environmental Remediation at Lawrence Livermore National Laboratory Site 300 Pit 7 Complex  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Environmental Assessment for the Proposed Environmental Remediation at Lawrence Livermore National Laboratory Site 300 Pit 7 Complex January 2007 Department of Energy National Nuclear Security Administration Livermore Site Office EA for the Proposed Environmental Remediation at the Lawrence Livermore National Laboratory Site 300 Pit 7 Complex i CONTENTS 1.0 INTRODUCTION..................................................................................................................1 1.1 Background ......................................................................................................................1 1.2 Purpose and Need for the Action .....................................................................................5

499

Guidance Regarding Actions That May Proceed During the NEPA Process:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions That May Proceed During the NEPA Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions. Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions More Documents & Publications NEPA and NHPA: A Handbook for Integrating NEPA and Section 106 Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to

500

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z