1

Downhole steam generator at Kern River  

SciTech Connect

Testing of a prototype down-hole steam generator for use in enhanced oil recovery (EOR) operations has begun at a heavy oil reservoir in the Kern River oil field in California. Steam and combustion gases are directed into an 800-ft-deep reservoir through a standard surface steam delivery system, although the system is designed to function at depths to 4500 ft. Present steam injection techniques require one-third of the oil recovered to be used to fuel the injection system, and the boilers require scrubbers to control emissions to specifications. The down-hole system is expected to use only 2/3 as much fuel as the conventional systems and to have less impact on air quality.

Rintoul, B.

1980-05-01T23:59:59.000Z

2

Kern River Cogeneration Company Box 80478, Bakers'field, CA 93380 (661) 615-4630 Neil E. Burgess, Executive Director  

E-Print Network (OSTI)

Kern River Cogeneration Company Box 80478, Bakers'field, CA 93380 (661) 615-4630 Neil E. Burgess Commission 1516 Ninth Street Sacramento, CA 95814 Re: Kern River Cogeneration Company (82-AFC-2C the operation of the combustion gas turbine units at Kern River Cogeneration Company in an extended startup mode

3

Comparison of cracking kinetics for Kern River 650{degrees}F{sup +} residuum and Midway Sunset crude oil  

Science Conference Proceedings (OSTI)

Kern River 650{degrees}F{sup +} residuum and Midway Sunset crude oil were examined by micropyrolysis at several constant-heating rates to determine pyrolysis cracking kinetics. Determined by the discrete distribution method, both feeds exhibited principal activation energies of 50 kcal/mol and frequency factors {approximately} 10{sup 13} sec{sup -1}. Energy distributions were similar ranging from 45 to 57 kcal/mol. Determined by the shift-in-T{sub max} method, E{sub approx}, A{sub approx} for Kern River 650{degrees}F{sup +} and Midway Sunset were 48 kcal/mol, 1.3 X 10{sup 12} sec{sup -1}, and 46 kcal/mol, 4.6 X 10{sup 11} sec{sup -1}, respectively. These results are similar, but not identical to other kinetic parameters for heavy oils from type II source rocks.

Reynolds, J.

1995-05-01T23:59:59.000Z

4

LightWeight KerneL  

NLE Websites -- All DOE Office Websites (Extended Search)

Catamount n-Way LightWeight KerneL 1 R&D 100 Entry Catamount n-Way LightWeight KerneL 2 R&D 100 Entry Submitting organization Sandia National Laboratories PO Box 5800 Albuquerque,...

5

LightWeight KerneL  

NLE Websites -- All DOE Office Websites (Extended Search)

Catamount n-Way Catamount n-Way LightWeight KerneL 1 R&D 100 Entry Catamount n-Way LightWeight KerneL 2 R&D 100 Entry Submitting organization Sandia National Laboratories PO Box 5800 Albuquerque, NM 87185-1319 USA Ron Brightwell Phone: (505) 844-2099 Fax: (505) 845-7442 rbbrigh@sandia.gov AFFIRMATION: I affirm that all information submitted as a part of, or supplemental to, this entry is a fair and accurate representation of this product. _____________________________ Ron Brightwell Joint entry Operating Systems Research 1527 16th NW #5 Washington, DC 20036 USA Trammell Hudson Phone: (240) 283-1700 Fax: (843) 971-9774 hudson@osresearch.net ProduCt name Catamount N-Way (CNW) Lightweight Kernel brief deSCriPtion CNW is an operating system that exploits existing features of multi-core processors

6

Water geochemistry study of Indian Wells Valley, Inyo and Kern...  

Open Energy Info (EERE)

Water geochemistry study of Indian Wells Valley, Inyo and Kern Counties, California. Supplement. Isotope geochemistry and Appendix H. Final report Jump to: navigation, search...

7

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

8

Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.  

DOE Green Energy (OSTI)

Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

Not Available

1985-01-01T23:59:59.000Z

9

Kern County, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Kern County, California: Energy Resources Kern County, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.4937274°, -118.8596804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.4937274,"lon":-118.8596804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

10

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

11

Kern County Regional High School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov California Regions Kern County Regional High School Science Bowl Print Text Size: A A A RSS...

12

California Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Kern River Gas Transmission ... California suffered an energy crisis characterized by electricity price instability and ... California ISO (Independent System Operator)

13

Water geochemistry study of Indian Wells Valley, Inyo and Kern Counties,  

Open Energy Info (EERE)

geochemistry study of Indian Wells Valley, Inyo and Kern Counties, geochemistry study of Indian Wells Valley, Inyo and Kern Counties, California. Supplement. Isotope geochemistry and Appendix H. Final report Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Water geochemistry study of Indian Wells Valley, Inyo and Kern Counties, California. Supplement. Isotope geochemistry and Appendix H. Final report Details Activities (4) Areas (4) Regions (0) Abstract: Hydrogen and oxygen isotope data on waters of Indian Wells Valley, the Sierra, Rose Valley, and Coso thermal and nonthermal waters were studied. The isotope ratios of Sierran waters are a function of latitude with both ratios becoming depleted in the heavier isotopes from south to north. Assuming that groundwater recharge is from the Sierra, recharge areas for the various groundwater types can be designated.

14

Kern County Regional High School Science Bowl | U.S. DOE Office of Science  

Office of Science (SC) Website

Kern County Regional High Kern County Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov California Regions Kern County Regional High School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Thomas Meyer Email: tmeyer@csub.edu Regional Event Information Date: Saturday, February 8, 2014 Maximum Number of Teams: 32 Maximum Number of Teams per School: 3

15

Internal structure of the Kern Canyon Fault, California: a deeply exhumed strike-slip fault  

E-Print Network (OSTI)

Deformation and mineral alteration adjacent to a 2 km long segment of the Kern Canyon fault near Lake Isabella, California are studied to characterize the internal structure of the fault zone and to understand the development of fault structure and constitution and the mechanical and chemical processes responsible for them. The 140 km long Kern Canyon fault (KCF) is a fault of 15 km right-lateral separation exhumed from seismogenic depth that cuts batholithic and metamorphic rocks of the southern Sierra Nevada. The fault consists of at least three distinct phases: an early phase of lower-greenschist-grade ductile shear with an S-C' phyllonite, a subsequent, dominant phase of brittle faulting characterized by a through-going zone of cataclastic rock, and a late stage of minor faulting along discontinuous, thin, hematitic gouge zones. The S-C' fabric and subsidiary fault-slip data indicate that both the phyllonitic and cataclastic zones are approximately vertical and strike-slip; slip lineations within the hematitic gouge suggest oblique-slip. The phyllonite zone trends N20-40E and accommodated ~175 m of separation. The cataclastic zone cuts the phyllonite, trends N21E, and consists of foliated and non-foliated cataclasites; it accommodates the majority of displacement along the fault. Abundant veins and fluid-assisted alteration in the rock surrounding the fault zone attest to the presence of fluids of evolving chemistry during both ductile and brittle faulting. Mass balance calculations indicate quartz loss during phyllonite faulting and imply that the fault system was open and experienced a negative change in volume during phyllonite faulting. Mesoscale and microscale fracture intensities decrease with log distance from the foliated cataclasites and approach a relatively low level at approximately 500 m. The internal structure of the Kern Canyon fault is similar to other large displacement faults in that it consists of a broad zone of fractured and altered rock and a narrow zone of intense cataclasis.

Neal, Leslie Ann

2002-01-01T23:59:59.000Z

16

Steamdrive design in a layered reservoir, South Belridge Field, Kern County, CA  

SciTech Connect

This paper describes the use of a thermal reservoir simulator to study steam drive in a reservoir consisting of non-communicating sand layers. The simulator was used to determine basic design parameters for steam drive operations in the South Belridge field, Kern County, California. Sensitivity runs were made to investigate the effect of various parameters such as spacing, steam quality, steam injection rate, etc. on performance. Comparisons were made of performance of a layered system with no communication between layers and an identical system with vertical communication. The effect of an 8/sup 0/ formation dip on performance of a pattern steam flood was also investigated.

Spivak, A.; Muscatello, J.A.

1985-03-01T23:59:59.000Z

17

Mitigation action plan sale of Naval Petroleum Reserve No. 1 (Elk Hills) Kern County, California  

Science Conference Proceedings (OSTI)

Naval Petroleum Reserve No. 1 (NPR-1, also called {open_quotes}Elk Hills{close_quotes}), a Federally-owned oil and gas production field in Kern County, California, was created by an Executive Order issued by President Taft on September 2, 1912. He signed another Executive Order on December 13, 1912, to establish Naval Petroleum Reserve No. 2 (NPR-2), located immediately south of NPR-1 and containing portions of the town of Taft, California. NPR-1 was not developed until the 1973-74 oil embargo demonstrated the nation`s vulnerability to oil supply interruptions. Following the embargo, Congress passed the Naval Petroleum Reserves Production Act of 1976 which directed that the reserve be explored and developed to its fall economic potential at the {open_quotes}maximum efficient rate{close_quotes} (MER) of production. Since Elk Hills began full production in 1976, it has functioned as a commercial operation, with total revenues to the Federal government through FY 1996 of $16.4 billion, compared to total exploration, development and production costs of $3.1 billion. In February 1996, Title 34 of the National Defense Authorization Act for Fiscal Year 1996 (P.L. 104-106), referred to as the Elk Hills Sales Statute, directed the Secretary of Energy to sell NPR-1 by February 10, 1998.The Secretary was also directed to study options for enhancing the value of the other Naval Petroleum and Oil Shale Reserve properties such as NPR-2, located adjacent to NPR-1 in Kern County- Naval Petroleum Reserve No. 3 (NPR-3) located in Natrona County, Wyoming; Naval Oil Shale Reserves No. 1 and No. 3 (NOSR-1 and NOSR-3) located in Garfield County, Colorado; and Naval Oil Shale Reserve No. 2 (NOSR-2) located in Uintah and Carbon Counties, Utah. The purpose of these actions was to remove the Federal government from the inherently non-Federal function of operating commercial oil fields while making sure that the public would obtain the maximum value from the reserves.

NONE

1998-01-01T23:59:59.000Z

18

Climate controls on Valley Fever incidence in Kern County, California, USA Charlie Zender , Department of Earth System Science, University of California at Irvine  

E-Print Network (OSTI)

Kern Co. climatology constructed from NOAA SAMSON (1961­1990), ISHO (1995­2000), HUSWO (1990­1995), Hanford Forecast data (2001­2002). We analyze climatological means ¯x, anomalies xn, of monthly time

Zender, Charles

19

Reservoir characterization and diagenesis of the oligocene 64-zone sandstone, North Belridge Field, Kern County, California  

Science Conference Proceedings (OSTI)

The Oligocene (Zemorrian) 64-Zone sandstone is an important oil and gas reservoir in North Belridge field, Kern County, California. The 64-Zone is a submarine-fan deposit that ranges from 83 to 137 m in thickness. The overall variations in reservoir quality reflect an upward increase in grain size associated with depositional processes. Three diagenetic events have had a significant impact on reservoir quality: (1) compaction, which reduced intergranular volume to an average of 20%, (2) quartz cement, which reduced porosity by an average of 6.2%, and (3) feldspar dissolution. Although an average of 2.7% porosity is directly associated with leached feldspar grains, mass balance calculations indicate secondary porosity is roughly balanced by formation of authigenic kaolinite, resulting in little or no net gain in porosity. Three episodes of calcite cementation reflect various stages of burial history. Petrographic and isotopic data demonstrate that calcite I formed at shallow depths in the zone of bacterial sulfate reduction. Fluid inclusion data indicate that calcite II precipitated at temperatures of 92 to 167[degrees]C from fluids less saline than seawater. Fracture-filing calcite III post-dates calcite II, but formed at lower temperatures (85 to 125[degrees]C). The results of isotopic modeling indicate that calcite II precipitated in equilibrium with waters expelled by shales during I/S diagenesis ([delta][sup 18]O[sub SMOW] = + 2 to +8%) and that calcite III precipitated during tectonic uplift from a mixture of shale-derived and meteoric waters ([delta][sup 18]O[sub SMOW] = 0 to +4%). Most fluid inclusions in calcite II yield temperatures greater than present bottom-hole values ([approximately]110[degrees]C). Assuming that fluid inclusions in calcite II record maximum burial and geothermal gradient of 33[degrees]C/km, tectonic uplift of 0.6 to 1.7 km ([approximately]2000-5700 ft) would be required to explain the fluid inclusion data. 48 refs., 18 figs., 1 tab.

Taylor, T.R. (Shell Development Company, Houston, TX (United States)); Soule, C.H. (Applied Geotechnology, Inc., Bellevue, WA (United States))

1993-09-01T23:59:59.000Z

20

Surveillance of vector populations and malaria transmission during the 2009/10 El Nino event in the western Kenya highlands: opportunities for early detection of malaria hyper-transmission  

E-Print Network (OSTI)

to Plasmodium falciparum transmission intensity. MalariaIdentification of malaria transmission and epidemic hotspotsIM: Pattern of malaria transmission along the Rahad river

Ototo, Ednah N; Githeko, Andrew K; Wanjala, Christine L; Scott, Thomas W

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

22

EA-1671: Big River Substation to Poston Substation 69-Kilovolt...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Line Project, Arizona and California EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California Summary The...

23

Reservoir description is key to steamflood planning and implementation, Webster Reservoir, Midway-Sunset Field, Kern County, California  

SciTech Connect

The Webster reservoir at Midway-Sunset field, Kern County, California, is an unconsolidated sand reservoir of Miocene age (''Stevens equivalent,'' Monterey Formation). The Webster was discovered in 1910 but, due to poor heavy oil (14/sup 0/ API) economics, development for primary production and subsequent enhanced recovery were sporadic. Currently, the reservoir produces by cyclic steam stimulation in approximately 35 wells. Cumulative oil production for the Webster since 1910 is about 13 million bbl. The Webster is subdivided into two reservoirs - the Webster Intermediate and Webster Main. The Webster Intermediate directly overlies the Webster Main in one area but it is separated by up to 300 ft of shale elsewhere. The combined thickness of both Webster reservoirs averages 250 ft and is located at a drilling depth of 1,100-1,800 ft. From evaluation of modern core data and sand distribution maps, the Webster sands are interpreted to have been deposited by turbidity currents that flowed from southwest to northeast in this area. Oil is trapped in the Webster reservoir where these turbidites were subsequently folded on a northwest-southeast-trending anticline. Detailed recorrelation on wireline logs, stratigraphic zonation, detailed reservoir description by zone, and sedimentary facies identification in modern cores has led to development of a geologic model for the Webster. This model indicates that the Webster Intermediate was deposited predominately by strongly channelized turbidity currents, resulting in channel-fill sands, and that the Webster Main was deposited by less restricted flows, resulting in more lobate deposits.

Hall, B.R.; Link, M.H.

1988-01-01T23:59:59.000Z

24

River Thames River Thames  

E-Print Network (OSTI)

C BD A River Thames River Thames Waterloo & City Southwark Northwood Northwood Hills North Harrow Oaks South Croydon East Croydon Streatham Common West Norwood Gipsy Hill Crystal Palace Birkbeck Penge

Delmotte, Nausicaa

25

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

26

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

27

Joint environmental assessment for Chevron USA, Inc. and Santa Fe Energy Resources, Inc.: Midway Valley 3D seismic project, Kern County, California  

Science Conference Proceedings (OSTI)

The proposed Midway Valley 3D Geophysical Exploration Project covers approximately 31,444 aces of private lands, 6,880 acres of Department of Energy (DOE) Lands within Naval Petroleum Reserve 2 (NPR2) and 3,840 acres of lands administered by the Bureau of Land Management (BLM), in western Kern County, California. This environmental assessment (EA) presents an overview of the affected environment within the project area using results of a literature review of biological field surveys previously conducted within or adjacent to a proposed 3D seismic project. The purpose is to provide background information to identify potential and known locations of sensitive wildlife and special status plant species within the proposed seismic project area. Biological field surveys, following agency approved survey protocols, will be conducted during October through November 1996 to acquire current resources data to provide avoidance as the project is being implemented in the field.

NONE

1996-10-01T23:59:59.000Z

28

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

29

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

30

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

31

Petroleum production at Maximum Efficient Rate Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California. Final Supplemental Environmental Impact Statement  

SciTech Connect

This document provides an analysis of the potential impacts associated with the proposed action, which is continued operation of Naval Petroleum Reserve No. I (NPR-1) at the Maximum Efficient Rate (MER) as authorized by Public law 94-258, the Naval Petroleum Reserves Production Act of 1976 (Act). The document also provides a similar analysis of alternatives to the proposed action, which also involve continued operations, but under lower development scenarios and lower rates of production. NPR-1 is a large oil and gas field jointly owned and operated by the federal government and Chevron U.SA Inc. (CUSA) pursuant to a Unit Plan Contract that became effective in 1944; the government`s interest is approximately 78% and CUSA`s interest is approximately 22%. The government`s interest is under the jurisdiction of the United States Department of Energy (DOE). The facility is approximately 17,409 acres (74 square miles), and it is located in Kern County, California, about 25 miles southwest of Bakersfield and 100 miles north of Los Angeles in the south central portion of the state. The environmental analysis presented herein is a supplement to the NPR-1 Final Environmental Impact Statement of that was issued by DOE in 1979 (1979 EIS). As such, this document is a Supplemental Environmental Impact Statement (SEIS).

Not Available

1993-07-01T23:59:59.000Z

32

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

33

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

34

Great River Energy (28 Member Cooperatives) - Commercial and Industrial  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Great River Energy (28 Member Cooperatives) - Commercial and Great River Energy (28 Member Cooperatives) - Commercial and Industrial Efficiency Rebates Great River Energy (28 Member Cooperatives) - Commercial and Industrial Efficiency Rebates < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Manufacturing Water Heating Program Info Funding Source Great River Energy State Minnesota Program Type Utility Rebate Program Rebate Amount Varies by measure and member cooperative offering. Provider Great River Energy Great River Energy, a generation and transmission cooperative which serves

35

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen  

NLE Websites -- All DOE Office Websites (Extended Search)

Issues on Hydrogen Issues on Hydrogen Pipelines Pipeline Transmission of Hydrogen Doe Hydrogen Pipeline Working Group Meeting August 31, 2005 Pipeline Transmission of Hydrogen --- 2 Copyright: Air Liquide Pipeline Inventory Breakdown by gases 0 500 1000 1500 2000 2500 3000 3500 KM N2 2956 km O2 3447 km H2 1736 km CO/Syngas 61 km TOTAL 8200 km Pipeline Inventory 2004 Asie Pacific America Europe Pipeline Transmission of Hydrogen --- 3 Copyright: Pipeline Transmission of Hydrogen --- 4 Copyright: 3. Special structures River Crossings (culvert): 6 (Rhein, Ruhr, Rhein-Herne-Kanal) River crossing (on bridge): 1 (Rhein-Herne-Kanal) Motorway Crossings: 26 Overground Pipelines: approx 21 km Pipeline Transmission of Hydrogen --- 5 Copyright: 5. Mining areas Pipeline Transmission of Hydrogen --- 6 Copyright: France & Netherlands

36

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

37

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

38

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

39

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

40

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Our River  

NLE Websites -- All DOE Office Websites (Extended Search)

River River Nature Bulletin No. 22 July 7, 1945 Forest Preserve District of Cook County Clayton F. Smith, President Roberts Mann, Superintendent of Conservation OUR RIVER The people of Cook County are missing a bet. They are not using their DesPlaines River. The other day we took a boat trip down that river from Lake County to Lawndale Avenue in Summit. It being a week day, we saw few people other than an occasional fisherman or pairs of strolling boys. Except for a bridge now and then, there were no signs or sounds of civilization. Chicago might have been a thousand miles away. We rested. There was isolation. There was peace. Once in a while a heron flew ahead of us; or a squirrel scampered up a tree; once we saw a family of young muskrats playing around the entrance to their den in the bank; twice we saw and heard a wood duck; again and again big fish plowed ripples surging ahead of us. It was shady and cool and still beneath the arching trees. We thought of the centuries this river had traveled. We were babes nuzzling again at the breast of Mother Nature.

42

Savannah River Site  

NLE Websites -- All DOE Office Websites (Extended Search)

River Site Savannah River Site Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of...

43

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

44

River Steamboats  

NLE Websites -- All DOE Office Websites (Extended Search)

River Steamboats River Steamboats Nature Bulletin No. 628-A February 12, 1977 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation RIVER STEAMBOATS The westward migration of the pioneer settlers and the rapid growth of agriculture, commerce and industry in the Middle West is in large part the story of water transportation on our inland waterways. The two main water routes were the chain of Great Lakes on the north and the Ohio River on the south. Sailing vessels carrying hundreds of tons were able to navigate on the Great Lakes almost as freely as on the ocean. Also, on the Ohio and Mississippi rivers heavy loads could be floated downstream from Pittsburgh to New Orleans -- almost 2000 miles. But boats had to be hauled back upstream by manpower -- grueling labor, stretching over weeks or months to move a few tons a few hundred miles. The coming of the steamboat a century and a half ago changed all this.

45

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism, American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

46

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

47

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

48

CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET  

E-Print Network (OSTI)

No. 04-0407-03 KERN RIVER COGENERATION PROJECT ) KERN RIVER COGENERATION COMPANY ) ORDER APPROVING a Petition ) to Allow for Either Cogen or Simple- _____ ) Cycle Operation The Kern River Cogeneration Company, the owner and operator of the Kern River Cogeneration Project, filed a petition on December 22, 2003

49

STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION In the Matter of: ) KERN RIVER COGENERATION ~ Docket No. 82-AFC-2C ) Order No. 11-1130-6 ) KERN RIVER COGENERATION ) ORDER APPROVING a Petition to Modify - - - - - - - - - - - - - ) On July 14, 2011, Kern River Cogeneration Company, the owner/operator of the Kern River Cogeneration

50

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

51

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

52

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

53

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

54

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

55

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

56

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

57

Arkansas River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Arkansas River Power Authority Place Colorado Website www.arpapower.org/ Utility Id 712 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

58

Great River Energy | Open Energy Information  

Open Energy Info (EERE)

Great River Energy Great River Energy Place Minnesota Utility Id 7570 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Great_River_Energy&oldid=410764"

59

Lower Colorado River Authority | Open Energy Information  

Open Energy Info (EERE)

River Authority River Authority Jump to: navigation, search Name Lower Colorado River Authority Place Texas Utility Id 11269 Utility Location Yes Ownership S NERC Location TRE NERC ERCOT Yes ISO Ercot Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

60

Platte River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Platte River Power Authority Place Colorado Website www.prpa.org/ Utility Id 15143 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

62

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

63

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

64

CALIFORNIA ENERGY COMMISSION 16 NINTH STREET  

E-Print Network (OSTI)

: Interested Parties FROM: Nancy Tronaas, Compliance Project Manager SUBJECT: Kern River Cogeneration Project from the Kern River Cogeneration Company (KRCC) to modify the Kern River Cogeneration Project (KRCP of State Route 99 in Kern County, California. KRCC requests that two of the four existing cogeneration

65

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

66

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

67

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

68

Red River Compact (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

The Red River Compact Commission administers the Red River Compact to ensure that Texas receives its equitable share of quality water from the Red River and its tributaries as apportioned by the...

69

River Basin Commissions (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

70

Maine Rivers Policy (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

The Maine Rivers Policy accompanies the Maine Waterway Development and Conservation Act and provides additional protection for some river and stream segments, which are designated as outstanding...

71

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

72

Record of Categorical Exclusion (CS) Determination, Office of Electricity Delivery and Energy Reliability (OE): PP-366 Twin Rivers Paper Company, Inc.  

Energy.gov (U.S. Department of Energy (DOE))

Presidential Permit authorizing Twin Rivers Paper Company, Inc. to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. Record of Categorical Exclusion

73

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

74

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

75

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

76

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

77

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

78

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

79

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

80

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

82

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

83

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

84

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

85

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

86

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

87

Salt River Project | Open Energy Information  

Open Energy Info (EERE)

Project Project Jump to: navigation, search Name Salt River Project Place Tempe, Arizona Utility Id 16572 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Salt River Project Smart Grid Project was awarded $56,859,359 Recovery Act Funding with a total project value of $114,003,719.

88

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

89

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

90

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

91

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

92

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

93

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

94

Conceptual Model At Raft River Geothermal Area (1988) | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Conceptual Model At Raft River Geothermal Area (1988) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Conceptual Model At Raft River Geothermal Area (1988) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Conceptual Model Activity Date 1988 Usefulness not indicated DOE-funding Unknown Exploration Basis Use geophysical logs to determine the reservoir transmissivity Notes Seven fracture orientation sets are recognized in the sedimentary and metamorphic rock units. Although the conventional geophysical logs showed

95

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

96

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERCs July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

97

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

98

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

99

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

100

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

102

Pecos River Compact (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation authorizes the state's entrance into the Pecos River Compact, a joint agreement between the states of New Mexico and Texas. The compact is administered by the Pecos River Compact...

103

Raft River Rural Elec Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Rural Elec Coop Inc Rural Elec Coop Inc Place Idaho Website www.rrelectric.com/index- Utility Id 22814 Utility Location Yes Ownership Cooperative NERC Location WECC NERC WECC Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png RAFT RIVER DIV: Small General, 60 AMPS and over, Single Phase Commercial RAFT RIVER DIV: Small General, 60 AMPS and over, Three Phase Commercial RAFT RIVER DIV: Large General 50KVA or greater, 60 AMPS or over Commercial RAFT RIVER DIV: Small General, Less than 60 AMPS, Single Phase Commercial RAFT RIVER DIV: Small General, Less than 60 AMPS, Three Phase Commercial

104

Simulation analysis of the unconfined aquifer, Raft River Geothermal Area,  

Open Energy Info (EERE)

Simulation analysis of the unconfined aquifer, Raft River Geothermal Area, Simulation analysis of the unconfined aquifer, Raft River Geothermal Area, Idaho-Utah Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Simulation analysis of the unconfined aquifer, Raft River Geothermal Area, Idaho-Utah Details Activities (1) Areas (1) Regions (0) Abstract: This study covers about 1000 mi2 (2600 km2) of the southern Raft River drainage basin in south-central Idaho and northwest Utah. The main area of interest, approximately 200 mi2 (520 km2) of semiarid agricultural and rangeland in the southern Raft River Valley that includes the known Geothermal Resource Area near Bridge, Idaho, was modelled numerically to evaluate the hydrodynamics of the unconfined aquifer. Computed and estimated transmissivity values range from 1200 feet squared per day (110

105

Savannah River National Laboratory  

At a glance Remote Electrical Throw Device Engineers at the Savannah River National Laboratory ... sufficient manufacturing capacity, established dist ...

106

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

107

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

108

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

109

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

110

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

111

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

112

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

113

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

114

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

115

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

116

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

117

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

118

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

119

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

120

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

122

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

123

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

124

Columbia River Peoples Ut Dist | Open Energy Information  

Open Energy Info (EERE)

Columbia River Peoples Ut Dist Columbia River Peoples Ut Dist Jump to: navigation, search Name Columbia River Peoples Ut Dist Place Oregon Utility Id 40438 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Drainage Pumping and Farm Irrigation Service Commercial Experimental Rate Schedule - General Service - Greater than 400 Amp Service Industrial General Service - Greater Than 400 Amp Service Commercial

125

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

126

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

127

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-07-03T23:59:59.000Z

128

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

129

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

130

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

131

2012 National Electric Transmission Congestion Study - St. Louis Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

St. Louis St. Louis Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop On December 8, 2011, DOE hosted a regional pre-study workshop in St. Louis, MO to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops 12-08-11 Congestion Workshop Agenda - St Louis (final).pdf Introduction by David Meyer, DOE Presentation by Kevin Gunn, MO PSC.pdf Presentation by Jerry Lein, ND PSC.pdf Presentation by Tom Sloan, KS Legislature.pdf Presentation by Maureen Borkowski, Ameren.pdf Presentation by Laureen L Ross McCalib, Great River Energy.pdf Presentation by Dale Osborn, MISO.pdf

132

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

133

Savannah River Site - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports Savannah River Site Review Reports 2013 Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013 Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013 Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project, January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design, January 2013 Activity Reports 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design, May 2013

134

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; its a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

135

Office of River Protection (ORP) and Washingotn River Protection Solutions,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of River Protection (ORP) and Washingotn River Protection Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project More Documents & Publications 2011 Annual Workforce Analysis and Staffing Plan Report - Office of River Protection Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01

136

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

137

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

138

Savannah River National Laboratory  

located in every town and city have the potential to be used as environmental ... Savannah River Nuclear Solutions, LLC. SRNS is responsible for

139

Savannah River Remediation Procurement  

NLE Websites -- All DOE Office Websites (Extended Search)

and procedures, rules and regulations, terms and conditions and the orders and directives under which Savannah River Remediation LLC (SRR) develops, issues, administers and...

140

Savannah River Ecology Laboratory  

NLE Websites -- All DOE Office Websites

Field Sites SREL is supported largely by external funding. Major sources include DOE Environmental Management, Savannah River Nuclear Solutions, USGS, US Department of the...

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Savannah River National Laboratory  

The coupling also provided excellent response to impact. ... used as a means of remote camera and equipment, ... Savannah River Nuclear Solutions, ...

142

Savannah River National Laboratory  

Savannah River Nuclear Solutions, LLC. SRNS is responsible for transferring its technologies to the private sector so that these technologies may have ...

143

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

144

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability analysisoftransmissionanddistributionVoltageRecovery,NERCTransmissionIssues SubcommitteAirConditionerResponsetoTransmissionFaults. ,IEEE

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

145

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights, IEEEto solve power transmission network design problems, IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

146

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

147

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

148

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

149

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

150

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

151

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

152

Peace River Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Peace River Electric Coop, Inc Peace River Electric Coop, Inc Jump to: navigation, search Name Peace River Electric Coop, Inc Place Florida Utility Id 14606 Utility Location Yes Ownership C NERC Location FRCC NERC FRCC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service Average Rates Residential: $0.1360/kWh Commercial: $0.1190/kWh Industrial: $0.2130/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Peace_River_Electric_Coop,_Inc&oldid=411342

153

Schlumberger soundings in the Upper Raft River and Raft River...  

Open Energy Info (EERE)

soundings in the Upper Raft River and Raft River Valleys, Idaho and Utah Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Schlumberger soundings in the Upper...

154

Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

155

about Savannah River National Laboratory  

S R N The Savannah River Site and the Savannah River National Laboratory are owned by the U.S. Department of Energy, and are managed and operated by Savannah River ...

156

Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Savannah River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

157

Hood River Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Hood River Electric Coop Hood River Electric Coop Place Oregon Utility Id 8830 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Commercial Irrigation Commercial Outdoor Lighting 100 watt HPS Light Lighting Outdoor Lighting 200 watt HPS Light Lighting Residential Residential Residential B Residential Residential Three Phase Residential Average Rates Residential: $0.0656/kWh Commercial: $0.0641/kWh Industrial: $0.0522/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

158

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

159

River Edge Redevelopment Zone (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the River Edge Redevelopment Program is to revive and redevelop environmentally challenged properties adjacent to rivers in Illinois.

160

from Savannah River National Laboratory  

operated by Savannah River Nuclear Solutions. SRNL offers innovative solutions ... The decommissioning of F Area at the Savannah River Site involves long-term management

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

162

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

163

Grand River Dam Authority | Open Energy Information  

Open Energy Info (EERE)

Dam Authority Dam Authority Jump to: navigation, search Name Grand River Dam Authority Place Oklahoma Utility Id 7490 Utility Location Yes Ownership S NERC Location SPP NERC SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png general service Commercial general service commercial Commercial large general servic time of use distributional Commercial

164

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

165

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

166

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

167

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

168

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-09-28T23:59:59.000Z

169

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Hitrik, Michael; Ola, Petri; Pivrinta, Lassi

2010-01-01T23:59:59.000Z

170

Re: Potomac River Generating Station Department of Energy Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEPCO is providing you with information regarding the planned PEPCO is providing you with information regarding the planned transmission maintenance outage Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: PEPCO is providing you with information regarding the planned transmission maintenance outage Docket No. EO-05-01. Order No. 202-07-02: Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance activities are not associated with its new transmission line installation, but are routine maintenance activities resulting from a switch problem identified during

171

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

172

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

173

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

174

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

175

Semiclassical transmission across transition states  

E-Print Network (OSTI)

It is shown that the probability of quantum-mechanical transmission across a phase space bottleneck can be compactly approximated using an operator derived from a complex Poincar\\'e return map. This result uniformly incorporates tunnelling effects with classically-allowed transmission and generalises a result previously derived for a classically small region of phase space.

Stephen C. Creagh

2005-06-01T23:59:59.000Z

176

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

177

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

178

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECCs RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a plan that consists of a package containing a small number of contingent plans that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

179

Savannah River National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River National Laboratory Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance Additive Manufacturing (3D Printing): Selectively Printed Conductive Pathways Researchers at the Savannah River National Laboratory (SRNL) have developed a rapid prototype conductive material that can be used for electrical shielding or circuit fabrication. Background Several rapid prototype technologies currently exist. A few of the technologies produce metallic parts, but the majority produce nonconductive parts made from various grades of plastic. In all of these technologies however, only conductive material or nonconductive material can be used within one part created. There is no known option for 3D printing conductive material for

180

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

182

The Cost of Transmission for Wind Energy: A Review of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Energy: A Review of Transmission Planning Studies Title The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies Publication Type Report Year of...

183

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

low unit transmission costs, there were still numerous studies with high transmission voltages that had much higher unit costs than studies with transmission lines

Mills, Andrew D.

2009-01-01T23:59:59.000Z

184

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

185

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

such as major transmission lines or large generators, areto the nearest bulk transmission line is the only dedicatedon constrained transmission lines (or conversely, pay

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

186

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does notincremental cost of transmission for wind energy implied by

Mills, Andrew D.

2009-01-01T23:59:59.000Z

187

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Transmission Planning and Wind Energy. Issue Brief. August.of new transmission for wind energy due to the complex andincreasingly including wind energy in transmission plans. We

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

188

Microsoft Word - CX-Bonneville-HoodRiverDangerPoleandARFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Darin Bowman Civil Engineer - TELF-TPP-3 Proposed Action: Bonneville-Hood River No. 1 Danger Pole Replacement and Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Hood River County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade access roads and landings from Structures 6/1 through 7/4 and replace danger poles on the Bonneville-Hood River No. 1 115-kV transmission line. Background This project entails improving the existing access along the Bonneville-Hood River No. 1 transmission line; maintaining existing structure landings; and replacing three danger poles and associated hardware.

189

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

190

East River Elec Pwr Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Elec Pwr Coop, Inc Elec Pwr Coop, Inc Jump to: navigation, search Name East River Elec Pwr Coop, Inc Place South Dakota Utility Id 5552 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Transmission Yes Activity Buying Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=East_River_Elec_Pwr_Coop,_Inc&oldid=410618"

191

Sioux River Ethanol LLC | Open Energy Information  

Open Energy Info (EERE)

River Ethanol LLC Jump to: navigation, search Name Sioux River Ethanol LLC Place Hudson, South Dakota Zip 57034 Product Farmer owned ethanol producer, Sioux River Ethanol is...

192

Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act (Minnesota) Scenic River Protection Policy, Minnesota Wild and Scenic Rivers Act (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting

193

Midwest Transmission Workshop I Summary  

SciTech Connect

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

194

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

195

Loup River Public Power Dist | Open Energy Information  

Open Energy Info (EERE)

River Public Power Dist River Public Power Dist Jump to: navigation, search Name Loup River Public Power Dist Place Nebraska Utility Id 11251 Utility Location Yes Ownership P NERC Location MRO NERC SPP Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Lighting Customer Lease 100W HPS Commercial Area Lighting Customer Lease 175W MV Commercial Area Lighting Customer Lease 250W HPS Commercial Area Lighting Customer Lease 250W MV Commercial

196

Tongue River Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Tongue River Electric Coop Inc Tongue River Electric Coop Inc Jump to: navigation, search Name Tongue River Electric Coop Inc Place Montana Utility Id 19022 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service - Three Phase Commercial Irrigation Service Industrial Large Power Service Commercial Single Phase Service Residential Stock Water Pumping Service Industrial Street and Security Lighting - 175 watt HPS Lighting Street and Security Lighting - 250 Watt MV or 150 Watt HPS Lighting

197

City of Elk River, Minnesota (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

River, Minnesota (Utility Company) River, Minnesota (Utility Company) Jump to: navigation, search Name City of Elk River Place Minnesota Utility Id 5773 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Retail Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Demand Commercial Commercial Dual Fuel Usage Residential Energy Storage Usage Residential Interruptible Load Program Credits Commercial Non-Demand Commercial Commercial

198

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

199

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

200

Scanning/Transmission Electron Microscopes  

NLE Websites -- All DOE Office Websites (Extended Search)

ScanningTransmission Electron Microscopes Nion UltraSTEM 60-100 dedicated aberration-corrected STEM for low- to mid-voltage operation and Enfina EELS Contact: Juan-Carlos Idrobo,...

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

The objective of this project is to reduce capital cost by extending life expectancy of overhead transmission wood structures through inspection and assessment procedures and through aging mitigation techniques and tools.

2005-11-29T23:59:59.000Z

202

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

203

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

204

Transmission Structure Foundation Design Guide  

Science Conference Proceedings (OSTI)

This guide contains the most current and comprehensive information for the design of foundations for overhead line structures. The guide covers the complete transmission structure foundation design process from the subsurface investigations and design of the foundations, to the construction and inspection of the foundation. Reference documents to assist transmission structure foundation designers in the development of specifications such as for subsurface investigations and foundation construction ...

2012-11-28T23:59:59.000Z

205

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

206

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

case study of U.S. transmission line siting, Energy Policy,Dual variable on transmission line ks power flownetwork branches (transmission lines), it is possible to

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

207

Ultra-Long-Haul WDM transmission systems  

Science Conference Proceedings (OSTI)

This paper discusses the key transmission issues and design considerations for ultra-long-haul WDM systems. The key enabling technologies for the current generation of ultra-long-haul WDM transmission are described. Noise analysis and transmission modelling ...

Y. R. Zhou; A. Lord; S. R. Sikora

2002-10-01T23:59:59.000Z

208

River Protection.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cc: cc: DOE/IG-0506 I N S P E C T I O N R E P O R T U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS I N S P E C T I O N O F SELECTED ASPECTS OF THE OFFICE OF RIVER PROTECTION PERFORMANCE-BASED INCENTIVE PROGRAM JUNE 2001 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 June 14, 2001 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of Selected Aspects of the Office of River Protection Performance-Based Incentive Program" BACKGROUND The Office of River Protection (ORP), which reports to the Office of Environmental Management, is responsible for remediation of the radioactive waste stored in tanks at the Hanford Site in the State of Washington. For Fiscal Year (FY) 2000, ORP established 26 performance-based contract

209

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

210

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

211

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

212

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

213

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

214

Electric generating or transmission facility: determination of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination...

215

Definition: Deferred Transmission Capacity Investments | Open...  

Open Energy Info (EERE)

transformers.1 Related Terms transmission lines, transformer, transmission line, sustainability References SmartGrid.gov 'Description of Benefits' An inl LikeLike UnlikeLike...

216

EIS-0285: Transmission System Vegetation Management Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission System Vegetation Management Program June 23, 2000 EIS-0285: EPA Notice of Availability of the Final Environmental Impact Statement Transmission System Vegetation...

217

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

218

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Gallery < Transmission Jump to: navigation, search PhotoGalleryHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada...

219

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

American Transmission Systems Inc Place Ohio Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes References EIA...

220

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

Atlas < Transmission Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California...

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

222

NREL: Transmission Grid Integration - Eastern Renewable Generation...  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission? How does geographic diversity of wind reduce wind integration costs? How do offshore and onshore wind power compare? What transmission is needed to facilitate higher...

223

Definition: Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Definition No reegle definition available. Also Known As Firm services Related Terms transmission lines, electricity generation, transmission line, smart grid References ...

224

Definition: Transmission Reliability | Open Energy Information  

Open Energy Info (EERE)

to ensure reliable system operation as system conditions change.1 Related Terms transmission lines, transfer capability, system, transmission line References Glossary...

225

Definition: Transmission Reliability Margin | Open Energy Information  

Open Energy Info (EERE)

system operation as system conditions change.1 Related Terms transfer capability, transmission lines, system, transmission line References Glossary of Terms Used in...

226

Definition: Transmission Constraint | Open Energy Information  

Open Energy Info (EERE)

that may be reached during normal or contingency system operations.1 Related Terms transmission lines, system, contingency, transmission line, element References ...

227

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

228

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

Transmission Company Jump to: navigation, search Name Michigan Electric Transmission Company Place Michigan Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO...

229

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

230

Rivanna River Basin Commission (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

231

from Savannah River National Laboratory  

Operated by Savannah River Nuclear Solutions for the U.S. Department of Energy near Aiken, S.C. E from Savannah River National Laboratory PAGE 2 OF 2 ...

232

NDN, volume transmission, and self-organization in brain dynamics  

E-Print Network (OSTI)

NDN, VOLUME TRANSMISSION, AND SELF- ORGANIZATION IN BRAINThese systems instantiate volume transmission bynonsynaptic diffusion transmission, in concert with the

Freeman, Walter J III

2005-01-01T23:59:59.000Z

233

Definition: Non-Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

available. Also Known As Interruptible Load or Interruptible Demand Related Terms transmission lines, electricity generation, transmission line, firm transmission service,...

234

Savannah River Nuclear Solutions LLC  

Savannah River Nuclear Solutions LLC Permission to Publish KNOW ALL MEN BY THESE PRESENTS, that the undersigned (hereinafter referred to

235

Aquatic Supplement Hood River Subbasin  

E-Print Network (OSTI)

crystal springs 4 Crystal Sp WD bypass reach to overflow? ? 4 dog river 3 City of TD none 3 no infoAppendix B Aquatic Supplement Contents Hood River Subbasin Tables and Figures: Table 1. Current estimated peak summer withdrawals from the Hood River Table 2. Historic lake stocking and fish introductions

236

Re: Potomac River Generating Station Department of Energy, Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

evised plan for evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the following information regarding the revised plan for transmission outages for the 230 kV circuits that are scheduled during the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the above-captioned proceeding, Order No. 202-05-03, and pursuant to the expanded notice required in Order No. 202-07-02, issued on January 31 Order, Pepco will provide advance notification of the outages to Mirant,

237

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

238

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

239

Transmission Rights and Market Power James Bushnell  

E-Print Network (OSTI)

of the transmission grid can advantage some competitors at the expense of others. In electricity markets around control of transmission paths. In electricity markets such as California's, even financial transmissionPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part

California at Berkeley. University of

240

The Development of HVDC Transmission System  

Science Conference Proceedings (OSTI)

The ever increasing process of high-voltage high-power fully controlled semiconductor technology has promoted the flexible ac transmission systems ahead significantly. Developments advance both the HVDC power transmission and the flexible ac transmission ... Keywords: converters station, HVDC transmission systems, power electronics

Yang Zhou; Dao Zhuojiang; Yu Fenwang

2012-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Principles for interregional transmission expansion  

Science Conference Proceedings (OSTI)

In aiming to facilitate the siting of interregional transmission lines, some basic principles might include an approach where the Federal Energy Regulatory Commission uses a variety of tools to capture the value of new transmission, and thus increase the supply of interregional lines. There also may be opportunities for the Commission to work with localities to reduce resistance to new lines by means of economic incentives. Such a tack has the potential to be more efficient than fighting local opposition in the courts. (author)

Benjamin, Richard

2007-10-15T23:59:59.000Z

242

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

243

Transmission System Reliability Performance Metrics Requirements  

Science Conference Proceedings (OSTI)

Transmission availability has become the significant indicator of overall transmission system operational health, due to increased utilization of the transmission system, growth of deregulated energy wholesale markets, and decreased investment in new transmission assets. Availability trends reflect the increasing dependence upon transmission assets from a technical and market perspective. Presently availability metrics lack comparability due to the non-standardization of underlying data collection method...

2003-12-12T23:59:59.000Z

244

Transmission System SQRA Assessment Methods  

Science Conference Proceedings (OSTI)

Market conditions and increasingly stringent regulatory requirements have focused attention on metrics that quantify the Security, Quality, Reliability, and Availability (SQRA) of transmission systems. This report summarizes the state-of-the-art in performance metrics, provides four case studies of their use, and discusses future trends in reliability metrics, congestion metrics, and benchmarking.

2009-07-31T23:59:59.000Z

245

Underground Transmission Systems Reference Book  

Science Conference Proceedings (OSTI)

The Underground Transmission Systems Reference Book covers all stages of cable system design and operation, from initial planning studies to failure analysis. It contains contributions from many of the industry's experts and represents practices from all parts of the United States.

1993-03-01T23:59:59.000Z

246

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

247

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (Participating TO) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Companys (PG&E) Docket No. ER01-66-000, (2) San Diego Gas and Electric Companys supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (TRBA) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

248

Boundary stabilization of transmission problems  

E-Print Network (OSTI)

We study the transmission problem in bounded domains with dissipative boundary conditions. Under some natural assumptions, we prove uniform bounds of the corresponding resolvents on the real axis at high frequency, and as a consequence, we obtain free of eigenvalues regions. As an application, we get exponential decay of the energy of the solutions of the correpsonding mixed boundary value problems.

Fernando Cardoso; Georgi Vodev

2009-10-20T23:59:59.000Z

249

Securing the Value of the Federal Columbia River Power System, Keeping Current, June 1998, Issue 98.  

DOE Green Energy (OSTI)

This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management.

United States. Bonneville Power Administration.

1998-06-01T23:59:59.000Z

250

Hood River Passive House  

Science Conference Proceedings (OSTI)

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

Hales, D.

2013-03-01T23:59:59.000Z

251

Management of Riparian Areas on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly cross streams, rivers, ponds, and lakes. Plant communities along the edges of these water resources are important because of their role in soil conservation and habitat diversity as well as the influence they have on fauna and aquatic ecosystems. The area of vegetation affected by the water-based habitatand that in turn affects the wateris the riparian area. This report provides guidance on the definition and management considerations for riparian ...

2011-12-14T23:59:59.000Z

252

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

253

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

254

North Woods River: The St. Croix River in Upper Midwest History  

E-Print Network (OSTI)

Review: North Woods River: The St. Croix River in Upperand Karamanski, Theodore J. North Woods River: The St. Croixbeauty and splendor. In North Woods River, Eileen M. McMahon

Karalus, Daniel E

2011-01-01T23:59:59.000Z

255

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

256

Categorical Exclusion Determination Form Proposed Action Title: (0473-1529) Charles River Associates International Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29) Charles River Associates International Inc. - 29) Charles River Associates International Inc. - Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Massachusetts, Pennsylvania, Washington Proposed Action Description: Funding will support development of Topology Control, an algorithmic and software technology framework that will improve the efficiency of the electrical grid by implementing appropriate short-term changes of transmission line status to manage transmission congestion and uncertainties associated with integration of renewable generation sources into the electricity grid. Proposed work consists of (1) developing and validating a large power system model that accurately simulates day-ahead and intra-day power

257

Savannah River Site - Enforcement Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Documents Enforcement Documents Savannah River Site Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site, July 22, 2011 (NEA-2011-02) Consent Order issued to Parsons Infrastructure & Technology Group, Inc., related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies, Inc. related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010

258

Efficiency Benefits of EHV AC Transmission and Overlays in Interregional Transmission Expansion Planning  

Science Conference Proceedings (OSTI)

In the United States, transmission expansion planning historically focused on addressing local utility transmission needs. In the mid-to-late 1990s, the focus shifted to encompass regional transmission expansion, primarily driven by Federal Energy Regulatory Commission (FERC) mandates on open transmission access and emergence of regional transmission organizations. In recent years, three drivers have elevated transmission expansion planning to a higher, interregional level. These drivers are the ...

2012-11-29T23:59:59.000Z

259

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

260

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

262

Midwest Transmission Workshop II Summary  

DOE Green Energy (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

263

Guide for Transmission Line Grounding  

Science Conference Proceedings (OSTI)

Electrical utilities have a duty to provide effective grounding for managing steady-state and fault currents, whether near a large generating station or at a remote distribution pole ground. For transmission lines, this imperative is usually met with investment in overhead ground wires and grounding electrodes. Effective grounding at each tower improves reliability8212by providing low path impedance to lightning strokes8212and contributes to safety. However, the fundamental physical parameters in ground ...

2007-12-20T23:59:59.000Z

264

High current pulse transmission cable  

DOE Patents (OSTI)

This invention is comprised of a transmission cable for carrying high current pulses in which an even numbered plurality of electrical conductors surrounds a central ground conductor. Each electrical conductor is connected so that it at any instant in time it will carry current of opposite polarity to the polarity carried by adjacent conductors. This arrangement cancels practically all of the external fields generated by current in the conductors.

Parsons, W.M.

1990-09-28T23:59:59.000Z

265

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

266

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

267

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

in calculating the unit cost of wind energy transmissionimpacts of the cost of transmission for wind energy. Only inj = Transmission cost per unit of wind energy weighted by

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

268

Florida Nuclear Profile - Crystal River  

U.S. Energy Information Administration (EIA) Indexed Site

Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

269

Louisiana Nuclear Profile - River Bend  

U.S. Energy Information Administration (EIA) Indexed Site

River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

270

about Savannah River National Laboratory  

Savannah River Nuclear Solutions ... Office of Environmental Management Applied research ... in the areas of national security, clean energy and environmental stewardship

271

Susquehanna River Basin Compact (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

272

from Savannah River National Laoratory  

of Energys Savannah River Site near Aiken, South Carolina ... guidance for understanding natural complexity and heterogeneity in the environment. Impact

273

about Savannah River National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Tritium Effects on Materials In an effort to ensure the safety of the nation's nuclear weapons stockpile, the Savannah River National Laboratory (SRNL) maintains an active role in...

274

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

275

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

276

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

277

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Expanding an electrical transmission network requires heavy investments ... Long term transmission expansion planning determines, over an horizon of 10 or more years, ... generation sites are usually far away from the consumption centers.

278

Wireless power transmission for medical applications  

E-Print Network (OSTI)

We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

Payne, Joshua E.

279

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

280

Modeling-Computer Simulations At Raft River Geothermal Area (1979) | Open  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Modeling-Computer Simulations Activity Date 1979 Usefulness useful DOE-funding Unknown Exploration Basis To evaluate the hydrodynamics of the unconfined aquifer. Notes This study covers about 1000 mi2 (2600 km2) of the southern Raft River drainage basin in south-central Idaho and northwest Utah. The main area of interest, approximately 200 mi2 (520 km2) of semiarid agricultural and rangeland in the southern Raft River Valley that includes the known Geothermal Resource Area near Bridge, Idaho, was modelled numerically. Computed and estimated transmissivity values range from 1200 ft2 per day

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

282

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

low load levels there can be situations where the capacitive component of the transmission line causes voltage

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

283

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

284

Average transmission probability of a random stack  

E-Print Network (OSTI)

The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

Yin Lu; Christian Miniatura; Berthold-Georg Englert

2009-07-31T23:59:59.000Z

285

Directional Reactive Power Ground Plane Transmission  

Directional Reactive Power Ground Plane Transmission Technology Summary ... The invention can transmit electrical power through the surface of the ...

286

High Resolution Transmission Microscopy Characterization of an ...  

Science Conference Proceedings (OSTI)

High Resolution Transmission Microscopy Characterization of an Oxide ... Line Dislocation Dynamics Simulation of fundamental dislocation properties in...

287

Advantages of Integrating Precession Scanning Transmission ...  

Science Conference Proceedings (OSTI)

Presentation Title, Advantages of Integrating Precession Scanning Transmission Electron Microscopy in the Characterization of Metallic Materials. Author(s)...

288

Transmission Electron Microscopy Studies on Lithium Battery ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Energy Nanomaterials. Presentation Title, Transmission Electron Microscopy...

289

Exploration of Resource and Transmission Expansion Decisions  

E-Print Network (OSTI)

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energyin.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis Division #12;Resource and Transmission ExpansionResource and Transmission Expansion Decisions in WREZ

290

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

291

The real problem with Merchant transmission  

SciTech Connect

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

292

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

293

West River Electric Assn Inc | Open Energy Information  

Open Energy Info (EERE)

River Electric Assn Inc River Electric Assn Inc Place South Dakota Utility Id 20401 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Electric Heat - Residential Direct Wired Residential Electric Heat - Residential Submetered Residential Electric Heat- Commercial Direct Wired Commercial Electric Heat- Commercial Submetered Heat Credit Commercial Large Commercial > 250 kVA Commercial Large Commercial 51-250 kW Commercial Range Wells and Rural Load Ceters Commercial

294

White River Electric Assn, Inc | Open Energy Information  

Open Energy Info (EERE)

River Electric Assn, Inc River Electric Assn, Inc Place Colorado Utility Id 20576 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Schedule I-1- Irrigation Commercial Schedule LC- Large Commercial Commercial Schedule LP Trans 5-10 MW Industrial Schedule LP-P- Large Power Primary Industrial Schedule LP-S- Large Power Secondary Industrial Schedule LP-T Industrial Power L-6 >30 MW Industrial Schedule LP-T-L5- 10-30 MW Industrial Schedule R- General Service Residential Schedule SC- Small Commercial Commercial

295

Pennsylvania Scenic Rivers Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pennsylvania Scenic Rivers Program Pennsylvania Scenic Rivers Program Pennsylvania Scenic Rivers Program < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Transportation Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Environmental Regulations Siting and Permitting Provider Pennsylvania Department of Conservation and Natural Resources Rivers included in the Scenic Rivers System will be classified, designated and administered as Wild, Scenic, Pastoral, Recreational and Modified Recreational Rivers (Sections 4; (a) (1) of the Pennsylvania Scenic Rivers Act). Low dams are permitted on Modified Recreational Rivers, but are not

296

Wisconsin River Power Company | Open Energy Information  

Open Energy Info (EERE)

River Power Company Jump to: navigation, search Name Wisconsin River Power Company Place Wisconsin Utility Id 20863 Utility Location Yes Ownership I NERC Location RFC NERC MRO Yes...

297

Canadian River Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Savings Canadian River Compact (Texas) Canadian River Compact (Texas) Eligibility Utility Fed. Government Commercial...

298

Hydrologic Variability of the Cosumnes River Floodplain  

E-Print Network (OSTI)

Preserve (CRP) floodplain, Michigan Bar streamflow gage,and mean monthly streamflow streamflow at River at Michiganat Michigan Bar. at Cosumnes Cosumnes River Bar. SAN

Booth, Eric; Mount, Jeff; Viers, Joshua H.

2006-01-01T23:59:59.000Z

299

Big River Resources LLC | Open Energy Information  

Open Energy Info (EERE)

Name Big River Resources LLC Place West Burlington, Iowa Zip 52655 Product Dry-mill bioethanol producer with a cooperative structure. References Big River Resources LLC1...

300

Ohio River Ecological Research Program  

Science Conference Proceedings (OSTI)

This report presents the results of the 2009 Ohio River Ecological Research Program (ORERP) fish community sampling near 14 Ohio River power plants. The sampling program consisted of adult/juvenile fish, habitat, and water quality field studies conducted upstream and downstream of the participating power plants.

2012-02-28T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

302

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

303

Electronics and hydraulics control transmission  

SciTech Connect

Caterpillar engineers have combined electronics and hydraulics for improved transmission control and productivity. The control system had extensive field test experience during development. The system accumulated more than 100,000 hours on 17 vehicles, with individual vehicle times in the 2000-10,000-hour range. Job sites were chosen to test the system over a wide range of applications and locales. The EPTC components are CAT-designed and made by outside suppliers. The components must comply with CAT designs and specifications. All components are 100% functionally tested. The control box is computer-tested functionally at the supplier and at CAT before vehicle installation.

Morris, H.C.; Sorrells, G.K.

1986-04-01T23:59:59.000Z

304

The role of transmission investment in the coordination between generation and transmission  

E-Print Network (OSTI)

generation and transmission of electricity into distinct modules. The governance structure of transmission the governance of electricity transmission assets influences the implementation of power flow management. Finally to coordinate generation and transmission of electricity is in real organizations. 1 Assistant Professors

Paris-Sud XI, Université de

305

Application of EPRI's Transmission Services Costing Framework to the Development of Open Access Transmission Tariffs  

Science Conference Proceedings (OSTI)

Public utilities in the United States are expected to provide transmission services and ancillary services to eligible customers. This report documents how Centerior Energy Corporation developed a network integration transmission service tariff, a point-to-point transmission service tariff, and four ancillary services tariffs by applying EPRI's Transmission Services Costing Framework.

1996-03-09T23:59:59.000Z

306

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

307

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

308

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

309

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

310

Transmission Electron Microscopy Study of InN Nanorods  

E-Print Network (OSTI)

Transmission Electron Microscopy Study of InN Nanorods Z.epitaxy and studied by transmission electron microscopy,establish their quality. Transmission electron microscopy (

Liliental-Weber, Z.; Li, X.; Kryliouk, Olga; Park, H.J.; Mangum, J.; Anderson, T.

2008-01-01T23:59:59.000Z

311

National Transmission Grid Study: 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Grid Study: 2002 National Transmission Grid Study: 2002 National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE)...

312

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

CaliforniaTransmissionLocal Regulations < California | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State...

313

Transmission Forum Agenda - February 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Forum Agenda - February 2012 Transmission Forum Agenda - February 2012 FINAL AGENDA - Transmission Forum Feb 2012 (Denver) 020212.pdf More Documents & Publications DOE...

314

PP-76 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 The Vermont Electric Transmission Company PP-76 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct,...

315

PP-76-1 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to...

316

EMISSION AND TRANSMISSION NOISE PROPAGATION IN POSITRON EMISSION COMPUTED TOMOGRAPHY  

E-Print Network (OSTI)

26-29, 1979 EMISSION AND TRANSMISSION NOISE PROPAGATION INLBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION INl. LBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION IN

Gullberg, G.T.

2010-01-01T23:59:59.000Z

317

Comments of New England Electric Transmission Corporation on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

318

Automated manual transmission mode selection controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

319

Automated manual transmission shift sequence controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

320

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

322

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

323

Open Access Transmission and Renewable Energy Technologies  

Science Conference Proceedings (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

324

Colorado River Comm of Nevada | Open Energy Information  

Open Energy Info (EERE)

Comm of Nevada Comm of Nevada Jump to: navigation, search Name Colorado River Comm of Nevada Place Nevada Utility Id 4356 Utility Location Yes Ownership S NERC Location WECC NERC WECC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Buying Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Commercial: $0.0656/kWh The following table contains monthly sales and revenue data for Colorado

325

Colorado River Indian Irr Proj | Open Energy Information  

Open Energy Info (EERE)

Irr Proj Irr Proj Jump to: navigation, search Name Colorado River Indian Irr Proj Place Arizona Utility Id 3990 Utility Location Yes Ownership F NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.0804/kWh Commercial: $0.0720/kWh Industrial: $0.0551/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

326

Savannah River Site Homepage  

NLE Websites -- All DOE Office Websites (Extended Search)

7/2014 7/2014 SEARCH GO News Releases Video Releases Upcoming Events 12.31.13 Dr. Sam Fink Earns Donald Orth Lifetime Achievement Award 12.31.13 Savannah River Remediation Issues Fiscal Year 2013 Annual Report 12.18.13 Prototype System Brings Advantages of Wireless Technology to Secure Environment CLICK HERE FOR ADDITIONAL NEWS RELEASES CLICK HERE for our email news service, govDELIVERY 2013 PMI Project of the Year Award - Click to play on YouTube 2013 PMI Project of the Year Award Finalist: SRS Recovery Act Project PLAY VIDEO CLICK HERE FOR ADDITIONAL VIDEO RELEASES Enterprise.SRS - Safety and Security begin with me! SRS Status & Emergency Information * Cold War Patriot's Resource Fair - Aiken, SC (04.25.13) * 3rd Annual Small Modular Reactor Conference - Columbia, SC (04.16-17.13)

327

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

328

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

329

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

330

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

1987-05-19T23:59:59.000Z

331

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

332

Kangley - Echo Lake Transmission Line Project, Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selleck Kangley North Bend Cedar Falls Existing Transmission Lines Proposed Transmission Line Alternatives Under Consideration BPA Substation Alternative * * * * * * ...

333

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

334

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

335

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

336

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

337

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

338

Magnetic Materials for Broadband Transmission Line  

E-Print Network (OSTI)

The authors series of articles on broadband transmission line transformers (TLTs) concludes with these notes on magnetic materials and the properties that are important for best performance Ferrite and iron powder magnetic materials were developed to support a wide range of components, including inductors, EMI suppressors, conventional transformers and transmission line transformers (TLTs). This article deals with transmission line transformers, presenting the observations and conclusions of the author, reached after extensive experimental research into the behavior and performance of these devices in broadband applications. Figure 1 The three transformers used in comparing the performance of the autotransformer and the transmission line transformer. At the top left is an autotransformer; at the top right is the transmission line transformer, while at the bottom is a transmission line transformer without a ferrite core. All transformers had a total of 10 turns.

Jerry Sevick

2005-01-01T23:59:59.000Z

339

Transmission Electron Microscope and Scanning Electron Microscopes -  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

340

Overhead Transmission Inspection and Assessment Guidelines -- 2011  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line compon...

2011-12-23T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Transmission Cable Life Evaluation and Management  

Science Conference Proceedings (OSTI)

High-pressure fluid-filled (HPFF) transmission cable systems constitute nearly 80 percent of the transmission cables in the United States, and represent an estimated $18 billion investment, in present-day dollars. Many of these systems are reaching or have exceeded their design life of 40 years, and evaluating their condition and remaining life is of utmost importance to utilities seeking to make full use of their underground transmission assets. This report describes procedures and diagnostic tools for ...

1998-12-24T23:59:59.000Z

342

Overhead Transmission Inspection and Assessment Guidelines - 2012  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line ...

2012-12-20T23:59:59.000Z

343

FERC rate incentives for transmission infrastructure development  

Science Conference Proceedings (OSTI)

With enactment of the Energy Policy Act of 2005, Congress delivered a mandate to the Federal Energy Regulatory Commission to establish regulations that would provide for incentive-based rate treatments for investments that would improvement the nation's electric transmission system. That has required FERC to move from merely approving cost-based rates for transmission services to enacting new regulations that would make it more attractive to invest in transmission infrastructure without offending the ''just and reasonable'' rate standard. (author)

Snarr, Steven W.

2010-03-15T23:59:59.000Z

344

Transmission System: Loss Reduction and Utilization Enhancement  

Science Conference Proceedings (OSTI)

EPRI R&D program 172Efficient Transmission Systems for a Carbon-Constrained Worldcomprises base research activities and a series of demonstration projects under the collaborative efforts led by EPRI, the Federal Energy Regulatory Commission (FERC), and the transmission industry. The program's goal is to understand, through real-life examples, designs that can help build a more efficient transmission system. Base research and development activities under program P172 have set the foundation for the demons...

2011-12-13T23:59:59.000Z

345

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

346

EPRI Increased Transmission Capacity Workshop Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's Increased Overhead Transmission Capacity Workshop. The workshop was held on September 20, 2011 at the offices of the American Transmission Company in Waukesha, Wisconsin. Participants included members of the EPRI Increased Overhead Transmission Capacity Task Force. The workshop was a joint effort of two EPRI research projects: (1) Increased Power Flow Guidebook and Ratings for Overhead Lines, and (2) Impact of High Temperature Operation on Conductor Systems...

2011-11-30T23:59:59.000Z

347

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

348

Marble River | Open Energy Information  

Open Energy Info (EERE)

River River Jump to: navigation, search Name Marble River Facility Marble River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EDP Renewables North America LLC Developer EDP Renewables North America LLC Energy Purchaser Merchant Location Churubusco NY Coordinates 44.9406848°, -73.9303307° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.9406848,"lon":-73.9303307,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

349

Black Hawk Lake Fresno River  

E-Print Network (OSTI)

Black Hawk Lake Fresno River R D 4 0 0 RD 415 HWY41 RD 207 REVISRD YO SEM ITE SP RINGS P KY LILLEY County Rosedale Ranch Revis Mountain Daulton Spring Red Top Lookout Buford Mountain Black Hawk Lake

Wang, Zhi

350

Caney River | Open Energy Information  

Open Energy Info (EERE)

River River Jump to: navigation, search Name Caney River Facility Caney River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Enel Green Power North America Inc. Developer Tradewind Energy LLC Energy Purchaser Tennessee Valley Authority Location Elk County KS Coordinates 37.448424°, -96.425027° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.448424,"lon":-96.425027,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

River-Forced Estuarine Plumes  

Science Conference Proceedings (OSTI)

The development, maintenance, and dissipation of river-forced estuarine plumes with and without seaward sloping bottom are studied by use of a three-dimensional, primitive-equation model. Inside the estuary, discussion is focused on how the ...

Shenn-Yu Chao

1988-01-01T23:59:59.000Z

352

Savannah River Operations Office Homepage  

NLE Websites -- All DOE Office Websites

Savannah River Operations banner art and link to DOE Link to Energy.gov Link to Energy.gov National Day of Remembrance NOTICE TO USERS Use of this system constitutes consent to...

353

Colorado River Basin Hydroclimatic Variability  

Science Conference Proceedings (OSTI)

An analysis of annual hydroclimatic variability in the Upper Colorado River basin (UCRB) for the period of 19062006 was performed to understand the dominant modes of multidecadal variability. First, wavelet-based spectral analysis was employed ...

Kenneth Nowak; Martin Hoerling; Balaji Rajagopalan; Edith Zagona

2012-06-01T23:59:59.000Z

354

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

355

Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preparation of the 2012 National Electric Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION COMPANY OF NEW YORK. INC. AND ORANGE AND ROCKLAND UTILITIES, INC....

356

2009 National Electric Transmission Congestion Study - Hartford...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive...

357

2012 National Electric Transmission Congestion Study - Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA...

358

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2...

359

NREL: Transmission Grid Integration - Research Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

360

2009 National Electric Transmission Congestion Study - Oklahoma...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Directional Reactive Power Ground Plane Transmission - Energy ...  

ORNL researchers have developed a pioneering power ... out-of-phase with respect to time. This phenomenon allows electrical transmission on a single ...

362

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

363

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

NLE Websites -- All DOE Office Websites (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

364

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

365

Atom Probe Tomography and Transmission Electron Microscopy ...  

Science Conference Proceedings (OSTI)

Abstract Scope, Atom probe tomography (APT) and analytical transmission .... of a Leaking Type 316 Socket Weld in a Boron Injection Tank Sampling Line.

366

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

a whollyowned subsidiary of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing...

367

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

LLC Place Juno Beach, Florida Zip 33408 Product Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC...

368

Transmission Expansion Planning Using an AC Model  

E-Print Network (OSTI)

Jan 2, 2013 ... Abstract: Transmission expansion planning (TEP) is a rather complicated process which requires extensive studies to determine when, where...

369

NREL: Transmission Grid Integration - Issues Affecting Renewable...  

NLE Websites -- All DOE Office Websites (Extended Search)

issues related to the integration of renewable energy sources into the transmission system. Developing solutions to these challenges will enable higher penetrations of...

370

Midwest Independent Transmission System Operator | Open Energy...  

Open Energy Info (EERE)

Name Midwest Independent Transmission System Operator Place Carmel, IN References SGIC1 No information has been entered for this organization. Add Organization This article is a...

371

Transmission eigenvalues for operators with constant coefficients  

E-Print Network (OSTI)

In this paper we study the interior transmission problem and transmission eigenvalues for multiplicative perturbations of linear partial differential operator of order $\\ge 2$ with constant real coefficients. Under suitable growth conditions on the symbol of the operator and the perturbation, we show the discreteness of the set of transmission eigenvalues and derive sufficient conditions on the existence of transmission eigenvalues. We apply these techniques to the case of the biharmonic operator and the Dirac system. In the hypoelliptic case we present a connection to scattering theory.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-04-28T23:59:59.000Z

372

NREL: Transmission Grid Integration - Working With Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working With Us NREL works with industry, government, and academia on transmission integration research. Learn how you can work with us. Develop Technology Partnerships There are a...

373

American Transmission Company LLC | Open Energy Information  

Open Energy Info (EERE)

American Transmission Company LLC Place Waukesha, WI References SGIC1 No information has been entered for this organization. Add Organization This article is a stub. You can help...

374

NREL: Transmission Grid Integration - Solar Integration National...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Western Wind and Solar Integration Study and Eastern Wind Integration and Transmission Study datasets greatly advanced the modeling of wind and solar power production...

375

Available Technologies: Transmission Electron Microscope Phase ...  

Robert Glaeser and Jian Jin have developed an apparatus that can be integrated into transmission electron microscopes (TEMs) to enable high contrast imaging of weak ...

376

OFDM techniques for multimedia data transmission.  

E-Print Network (OSTI)

??Orthogonal Frequency Division Multiplexing (OFDM) is an efficient parallel data transmission scheme that has relatively recently become popular in both wired and wireless communication systems (more)

Neville, K

2011-01-01T23:59:59.000Z

377

Transmission planning in deregulated power markets.  

E-Print Network (OSTI)

??Transmission systems in deregulated power systems have largely been left to centralized network operators although various forms of participation by merchant operators have been proposed. (more)

Panambarage Anton Jagath Fonseka.

2008-01-01T23:59:59.000Z

378

The hidden value of transmission assets  

SciTech Connect

Numerous utilities have realized that they can do better with their transmission assets than neutering them into ISOs and have proposed the creation of for-profit transmission companies (Transcos). This would turn transmission assets into equity with higher risk but also returns potentially higher than the regulated cost of capital. This article's contribution to the ongoing debate is to show that Transcos constitute a simple and robust solution to transmission congestion problems that would otherwise jeopardize the advent of competitive power markets. Policymakers and regulators should therefore view favorably the emergence of for-profit, regulated transmission companies, and leave them with reasonable room to recover their cost and earn a fully compensatory return on investment. Regulatory benevolence is crucial for Transcos, for electric power transmission is arguably the ultimate regulated activity: significant economies of scale and wide-ranging network externalities (the infamous loop flows) make operation and management of the grid a natural monopoly that must be regulated. A significant share of the value at stake therefore hinges on the regulator's attitude towards the for-profit transmission company: if the regulator is favorable, she will leave enough room to recover the variable and capital costs. If she is unfavorable, the proposition is simply a non-starter. This article first builds a public policy argument in favor of transmission companies, then discusses the key success factors required to create significant value in transmission: regulatory prowess and superior network management.

Nasser, T.O. (McKinsey and Co., Washington, DC (United States))

1999-06-01T23:59:59.000Z

379

Helicopter Transmission Case Study - Programmaster.org  

Science Conference Proceedings (OSTI)

The transmission components showed damage that was consistent with continued operation without oil, which ... Failure Analysis of a Pressure Transmitter Line.

380

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Western proposes to rebuild and upgrade two, parallel, 4.8-mile-long transmission lines located between Gila and North Gila Substations and take land actions...

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

NREL: Transmission Grid Integration Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Photo of transmission lines with a city in the background. NREL works with electric utilities, energy policymakers, and other industry partners to integrate large-scale renewable...

382

ESSAYS IN FINANCIAL TRANSMISSION RIGHTS PRICING.  

E-Print Network (OSTI)

??This work examines issues in the pricing of financial transmission rights in the PJM market region. The US federal government is advocating the creation of (more)

Posner, Barry

2006-01-01T23:59:59.000Z

383

TUTORIALS: Introduction to Conventional Transmission Electron ...  

Science Conference Proceedings (OSTI)

Jul 2, 2008 ... The link provided accesses the web site for the text, Introduction to Conventional Transmission Electron Microscopy by Marc DeGraef. The site...

384

Frontiers of In Situ Transmission Electron Microscopy  

Science Conference Proceedings (OSTI)

... significance and versatility of in situ transmission electron microscopy (TEM) has ... applied stimulus is observed as it happens inside the microscope. ...

2013-05-29T23:59:59.000Z

385

Coordination of Federal Authorizations for Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy...

386

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Aug 3, 2009 ... Abstract: Expanding an electrical transmission network requires heavy investments that need to be carefully planned, often at a regional or...

387

Data Transmission Performance of Graphene Interconnects  

Science Conference Proceedings (OSTI)

We are continuously improving the quality of CVD grown graphene layers to improve the bandwidth of transmission beyond the gigabits per second level.

388

Automated Transmission Kikuchi Diffraction for Nanomaterials ...  

Science Conference Proceedings (OSTI)

Presentation Title, Automated Transmission Kikuchi Diffraction for Nanomaterials Characterization in the SEM. Author(s), Scott Sitzman. On-Site Speaker...

389

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

New England Outlook: Smart Grid is About Consumers, Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

390

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

391

Mutual Design Considerations for Overhead AC Transmission Lines and Gas Transmission Pipelines, Volume 1: Engineering Analysis  

Science Conference Proceedings (OSTI)

This reference book presents data on an investigation into the mutual effects of electric power transmission lines and natural gas transmission pipelines sharing rights-of-way. Information is useful to both power and pipeline industry users.

1978-09-01T23:59:59.000Z

392

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

393

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

394

Comments of New England Electric Transmission Corporation on Proposed Open  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

395

Hydromechanical transmission with hydrodynamic drive  

DOE Patents (OSTI)

This transmission has a first planetary gear assembly having first input means connected to an input shaft, first output means, and first reaction means, and a second planetary gear assembly having second input means connected to the first input means, second output means, and second reaction means connected directly to the first reaction means by a reaction shaft. First clutch means, when engaged, connect the first output means to an output shaft in a high driving range. A hydrodynamic drive is used; for example, a torque converter, which may or may not have a stationary case, has a pump connected to the second output means, a stator grounded by an overrunning clutch to the case, and a turbine connected to an output member, and may be used in a starting phase. Alternatively, a fluid coupling or other type of hydrodynamic drive may be used. Second clutch means, when engaged, for connecting the output member to the output shaft in a low driving range. A variable-displacement hydraulic unit is mechanically connected to the input shaft, and a fixed-displacement hydraulic unit is mechanically connected to the reaction shaft. The hydraulic units are hydraulically connected together so that when one operates as a pump the other acts as a motor, and vice versa. Both clutch means are connected to the output shaft through a forward-reverse shift arrangement. It is possible to lock out the torque converter after the starting phase is over.

Orshansky, Jr., deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1979-01-01T23:59:59.000Z

396

Low cost Image Transmission System  

SciTech Connect

Throughout the Department of Energy (DOE) complex, sites protect themselves with intrusion detection systems. Some of these systems have sensors in remote areas. These sensors frequently alarm -- not because they have detected a terrorist skulking around the area, but because they have detected a horse, or a dog, or a bush moving in the breeze. Even though the local security force is 99% sure there is no real threat, they must assess each of these nuisance or false alarms. Generally, the procedure consists of dispatching an inspector to drive to the area and make an assessment. This is expensive in terms of manpower and the assessment is not timely. Often, by the time the inspector arrives, the cause of the alarm has vanished. A television camera placed to view the area protected by the sensor could be used to help in this assessment, but this requires the installation of high-quality cable, optical fiber, or a microwave link. Further, to be of use at the present time, the site must have had the foresight to have installed these facilities in the past and have them ready for use now. What is needed is a device to place between the television camera and a modem connecting to a low-bandwidth channel such as radio or a telephone line. This paper discusses the development of such a device: an Image Transmission System, or ITS.

Skogmo, D.

1994-06-01T23:59:59.000Z

397

BLM Humboldt River Field Office | Open Energy Information  

Open Energy Info (EERE)

Humboldt River Field Office Jump to: navigation, search Name BLM Humboldt River Field Office Short Name Humboldt River Parent Organization BLM Winnemucca District Office Address...

398

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Integrated Project Team RM...

399

Savannah River Site: Plutonium Preparation Project (PuPP) at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site: Plutonium Preparation Project (PuPP) at Savannah River Site Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River Site Full Document and Summary...

400

Comments of the Lower Colorado River Authority | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lower Colorado River Authority Comments of the Lower Colorado River Authority Comments of the Lower Colorado River Authority on Implementing the National Broadband Plan by Studying...

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The 'Watcher's Stage' in Lower Colorado River Indian Agriculture  

E-Print Network (OSTI)

Primitive Subsistence on the Lower Colorado and Gila Rivers.Watcher's Stage' in Lower Colorado River Indian AgricultureIndian tribes along the Colorado River to various interior

Lawton, Harry W.; Wilke, Philip J.

1977-01-01T23:59:59.000Z

402

PP-41 Mirias River Electric Cooperative, Inc. | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Mirias River Electric Cooperative, Inc. PP-41 Mirias River Electric Cooperative, Inc. Presidential Permit authorizing Mirias River Electric Cooperative, Inc. to constuct,...

403

Deep drilling data, Raft River geothermal area, Idaho-Raft River...  

Open Energy Info (EERE)

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Deep...

404

Transmission Investment: Nourishing a Gnarly Tree  

Science Conference Proceedings (OSTI)

The Federal Energy Regulatory Commission needs to create a proper framework for investors to weigh the economic viability of transmission projects, then step aside. That means allowing investors and utilities to enter into more varied business models, while maintaining the integrity of the stand-alone transmission business.

Renner, Stein B.

2005-09-01T23:59:59.000Z

405

Pricing transmission rights using ant colony optimization  

Science Conference Proceedings (OSTI)

We propose a novel idea for pricing Transmission Rights (which are similar to financial options) using a nature inspired meta heuristic algorithm, Ant Colony Optimization (ACO). ACO has been used extensively in combinatorial optimization problems and ... Keywords: ant colony optimization, financial options, transmission rights

Sameer Kumar Singh; Ruppa K. Thulasiram; Parimala Thulasiraman

2011-07-01T23:59:59.000Z

406

Transmission line protection based on travelling waves  

Science Conference Proceedings (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

407

Information transmission through lossy bosonic memory channels  

E-Print Network (OSTI)

We study the information transmission through a quantum channel, defined over a continuous alphabet and losing its energy en route, in presence of correlated noise among different channel uses. We then show that entangled inputs improve the rate of transmission of such a channel.

Giovanna Ruggeri; Giulio Soliani; Vittorio Giovannetti; Stefano Mancini

2005-02-15T23:59:59.000Z

408

Spatial mode properties of plasmon assisted transmission  

E-Print Network (OSTI)

Orbital angular momentum of photons is explored to study the spatial mode properties of plasmon assisted transmission process. We found that photons carrying different orbital angular momentums have different transmission efficiencies, while the coherence between these spatial modes can be preserved.

Xi-Feng Ren; Guo-Ping Guo; Yun-Feng Huang; Zhi-Wei Wang; Guang-Can Guo

2006-03-03T23:59:59.000Z

409

Ecological benefits of dc power transmission  

Science Conference Proceedings (OSTI)

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

410

New Approaches to Managing Transmission Project Risk  

Science Conference Proceedings (OSTI)

This report discusses the growing risks associated with transmission development and the importance of managing or hedging these risks. It presents case studies to illustrate the risks and categorizes approaches to managing them. It describes two EPRI tools that may be useful in managing transmission development risks, suggests how these tools might be further developed, and identifies other useful areas of research.

2006-11-15T23:59:59.000Z

411

On financial transmission rights and market power  

Science Conference Proceedings (OSTI)

This paper studies financial transmission rights in electricity pool markets with nodal pricing, when these rights are to be allocated by an auction mechanism. A market distribution function approach is used to investigate the effects on electricity ... Keywords: Electricity markets, Financial transmission rights, Nodal pricing

Geoffrey Pritchard; Andy Philpott

2005-10-01T23:59:59.000Z

412

Coordination of Federal Authorizations for Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

413

Transmission Issues and Power Exchanges in Texas  

E-Print Network (OSTI)

The electric transmission system in Texas has evolved over the years to its present state, in order to provide reliable service and reduce the amount of reserve capacity any individual utility needs to maintain. Presently there is pressure on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro-Magnetic Fields problem and how it relates to new transmission line construction.

Hughes, H. L.

1992-04-01T23:59:59.000Z

414

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

415

Big Rivers Electric Corp | Open Energy Information  

Open Energy Info (EERE)

Id 1692 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References...

416

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

417

EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California  

Energy.gov (U.S. Department of Energy (DOE))

The Department of the Interiors Bureau of Indian Affairs is preparing this EA, with DOEs Western Area Power Administration as a cooperating agency.

418

Conductive Channel for Energy Transmission  

SciTech Connect

For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

2011-11-10T23:59:59.000Z

419

CRSP Transmission Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

420

Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and supports nuclear nonproliferation initiatives. Environmental stewardship activities include the management, treatment, and disposal of radioactive, hazardous, and mixed wastes. Enforcement April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Canadian River Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canadian River Compact (Texas) Canadian River Compact (Texas) Canadian River Compact (Texas) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Texas Program Type Siting and Permitting Provider Canadian River Compact Commission The Canadian River Commission administers the Canadian River Compact which includes the states of New Mexico, Oklahoma, and Texas. Signed in 1950 by

422

www.eia.gov  

U.S. Energy Information Administration (EIA)

belridge south midway-sunset kern river alpine slaughter milne point green canyon blk 644 (holstein) hondo fp green canyon blk 826 (mad dog) cymric ...

423

www.eia.gov  

U.S. Energy Information Administration (EIA)

belridge south wasson yates kern river elk hills fg milne point alpine spraberry trend area slaughter hondo fp levelland endicott cymric pescado san ...

424

untitled  

Gasoline and Diesel Fuel Update (EIA)

Barrel) Year Month Alaska North Slope California Kern River California Midway- Sunset Heavy Louisiana Sweet Louisiana Light Sweet Mars Blend West Texas Intermediate West Texas...

425

X:\\Data_Publication\\Pma\\current\\ventura\\pma00.vp  

Gasoline and Diesel Fuel Update (EIA)

Slope California Midway- Sunset California Kern River California Wilmington Louisiana South Mix North Dakota Sweet West Texas Intermediate West Texas Sour Wyoming Sour 1994...

426

X:\\L6046\\Data_Publication\\Pma\\current\\ventura\\pma.vp  

Gasoline and Diesel Fuel Update (EIA)

Slope California Midway- Sunset California Kern River California Wilmington Louisiana South Mix North Dakota Sweet West Texas Intermediate West Texas Sour Wyoming Sour 1994...

427

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal  

Open Energy Info (EERE)

Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Deep drilling data, Raft River geothermal area, Idaho-Raft River geothermal exploration well sidetrack-C Details Activities (1) Areas (1) Regions (0) Abstract: Cassia County Idaho; data; geophysical surveys; Idaho; Raft River geothermal area; surveys; United States; USGS; Well No. 3; well-logging Author(s): Covington, H.R. Published: Open-File Report - U. S. Geological Survey, 1/1/1978 Document Number: Unavailable DOI: Unavailable Exploratory Well At Raft River Geothermal Area (1977) Raft River Geothermal Area Retrieved from "http://en.openei.org/w/index.php?title=Deep_drilling_data,_Raft_River_geothermal_area,_Idaho-Raft_River_geothermal_exploration_well_sidetrack-C&oldid=473365"

428

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

429

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

430

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

431

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

432

Federal-State Conflicts over the Colorado River  

E-Print Network (OSTI)

A RIVER No MORE: THE COLORADO RIVER AND THE WEST (1981). 3.agricultural use in the Colorado River Basin in California.and California's dispute over Colorado River water, spanning

Kaplan, David

1987-01-01T23:59:59.000Z

433

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

434

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

435

Savannah River National Laboratory - Home  

NLE Websites -- All DOE Office Websites

SRNL Logo SRNL and DOE logo art SRNL Logo SRNL and DOE logo art Top Menu Bar SRNL Update: Embassy Fellows Report A report co-authored by Savannah River National Laboratory Senior Advisory Engineer, Dr. Robert Sindelar, has been released. The report to the Government of Japan - Ministry of the Environment provides observations and recommendations on decontamination work and progress... >>MORE Portable Power Research at SRNL Hadron Technologies, Inc., a microwave technology and systems development and manufacturing company with offices in Tennessee and Colorado, has signed a license for a Hybrid Microwave and Off-Gas Treatment System developed by the Savannah River National Laboratory, the Department of Energy's applied science laboratory located at the Savannah River Site. >>MORE

436

Grays River Watershed Geomorphic Analysis  

SciTech Connect

This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: The effects of historical and current land use practices on erosion and sedimentation within the channel network The ways in which these effects have influenced the sediment budget of the upper watershed The resulting responses in the main stem Grays River upstream of State Highway 4 The past and future implications for salmon habi

Geist, David R.

2005-04-30T23:59:59.000Z

437

Savannah River Tank Waste Residuals  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah Savannah River Savannah River Tank Waste Residuals HLW Corporate Board November 6, 2008 1 November 6, 2008 Presentation By Sherri R. Ross Department of Energy Savannah River Operations Office The Issue * How clean is clean? * Ultimate Challenge - Justify highly radioactive radionuclides have been removed to the maximum extent practical? 2 removed to the maximum extent practical? - Building compelling regulatory documentation that will withstand intense scrutiny §3116 Requirements 1. Does not require disposal in deep geological repository 2. Highly radioactive radionuclides removed to the maximum extent practical 3. Meet the performance objectives in 10 CFR Part 3 3. Meet the performance objectives in 10 CFR Part 61, Subpart C 4. Waste disposed pursuant to a State-approved closure plan or permit Note: If it is anticipated that Class C disposal limits will be exceeded, additional

438

Instrument Series: Microscopy Environmental Transmission Electron Microscope  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Transmission Environmental Transmission Electron Microscope EMSL's environmental transmission electron microscope (ETEM) provides in situ capabilities that enable atomic-resolution imaging and spectroscopic studies of materials under dynamic operating conditions. In contrast to traditional operation of TEM under high vacuum, EMSL's ETEM uniquely allows imaging within high- temperature and gas environments-with a gas pressure up to 20 Torr. With a spherical aberration corrector for the objective lens, the ETEM captures atomic-level processes as they occur, enabling vital research across a range of scientific fields. Research Applications Chemical science and engineering - providing in situ observation of catalytic processes with atomic-level resolution Materials science and engineering - allowing

439

Solar collector having a solid transmission medium  

DOE Patents (OSTI)

There is provided a radiant energy transmission device capable of operation in a concentrative mode in which energy incident on an entrance area is directed toward and concentrated on an exit area of smaller area than the entrance area. The device includes a solid radiant energy transmission medium having surfaces coincident with the entrance and exit areas and particularly contoured reflective side walls. The surface coinciding with the entrance area is coupled to a cover plate formed of a radiant energy transmissive material. An energy transducer is coupled to the surface of the medium coinciding with the exit area.

Schertz, William W. (Batavia, IL); Zwerdling, Solomon (Woodridge, IL)

1977-06-14T23:59:59.000Z

440

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

River Network Routing on the NHDPlus Dataset  

Science Conference Proceedings (OSTI)

The mapped rivers and streams of the contiguous United States are available in a geographic information system (GIS) dataset called National Hydrography Dataset Plus (NHDPlus). This hydrographic dataset has about 3 million river and water body ...

Cdric H. David; David R. Maidment; Guo-Yue Niu; Zong-Liang Yang; Florence Habets; Victor Eijkhout

2011-10-01T23:59:59.000Z

442

Flambeau River Biofuels | Open Energy Information  

Open Energy Info (EERE)

Flambeau River Biofuels Flambeau River Biofuels Jump to: navigation, search Name Flambeau River Biofuels Place Park Falls, Wisconsin Sector Biomass Product A subsidiary of Flambeau River Papers LLC that plans to develop a Fischer Tropsch diesel project in Park Falls, Wisconsin that will process residual wood biomass from forest and agricultural sources. References Flambeau River Biofuels[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Flambeau River Biofuels is a company located in Park Falls, Wisconsin . References ↑ "Flambeau River Biofuels" Retrieved from "http://en.openei.org/w/index.php?title=Flambeau_River_Biofuels&oldid=345407" Categories: Clean Energy Organizations

443

Savannah River Site Environmental Implentation Plan  

SciTech Connect

This report describes the organizational responsibilities for the Savannah River Site Environmental program. Operations, Engineering and projects, Environment, safety, and health, Quality assurance, and the Savannah River Laboratory are described.

1989-08-01T23:59:59.000Z

444

Youghiogheny Wild and Scenic River (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

Portions of the Youghiogheny River are protected under the Scenic and Wild Rivers Act, and development on or near these areas is restricted. COMAR section 08.15.02 addresses permitted uses and...

445

River Corridor Closure Project Partnering Performance Agreement  

Energy.gov (U.S. Department of Energy (DOE))

WCH and DOE have a mission to complete the clsoure of the Hanford River Corridor by 2015. Early and efficient completion of this work scope law the River Corridor Closure Contract (DE-AC06...

446

A Family By Yellow River  

E-Print Network (OSTI)

River, opposite to Shenxi Province across the River, is within the central zone of Huangtu Plateau Culture in midland China. In history Qikou was a transport hinge connecting Sichuan to the west and Baotou (Inner Mongolia) to the northwest. Still seen... . They own seven mu (a mu is one fifteenth of a hectare) of jujube trees, which is an area expanded on a basis of one mu last year. The labour is tough with a typical droughty climate of Loess Plateau. Shouldering a pole with two buckets at either end...

China Central Television (CCTV)

2005-04-06T23:59:59.000Z

447

Columbia River Component Data Evaluation Summary Report  

Science Conference Proceedings (OSTI)

The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

C.S. Cearlock

2006-08-02T23:59:59.000Z

448

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

449

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

450

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

451

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

452

Polarization transmission at RHIC, numerical simulations  

SciTech Connect

Typical tracking simulations regarding the transmission of the polarization in the proton-proton collider RHIC are discussed. They participate in general studies aimed at understanding and improving polarization performances during polarized proton-proton runs.

Meot F.; Bai, M.; Liu, C.; Minty, M.; Ranjbar, V.

2012-05-20T23:59:59.000Z

453

Energy Transmission by Barotropic Rossby Waves Revisited  

Science Conference Proceedings (OSTI)

This article presents a semianalytic method to investigate the properties of energy transmission across bottom topography by barotropic Rossby waves. The method is first used to revisit the analytical estimates derived from wave-matching ...

R. P. Matano; E. D. Palma

2005-11-01T23:59:59.000Z

454

Scanning Transmission Electron Microscopy Investigations of Complex...  

NLE Websites -- All DOE Office Websites (Extended Search)

Scanning Transmission Electron Microscopy Investigations of Complex Oxides Monday, May 23, 2011 - 3:30pm SSRL Conference room 137-322 Professor Tom Vogt, NanoCenter & Department of...

455

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

456

Data transmission element for downhole drilling components  

DOE Patents (OSTI)

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

457

Natural Gas Transmission and Distribution Module  

Reports and Publications (EIA)

Documents the archived version of the Natural Gas Transmission and Distribution Model that was used to produce the natural gas forecasts used in support of the Annual Energy Outlook 2013.

Joe Benneche

2013-07-18T23:59:59.000Z

458

Transmission policy in the United States  

E-Print Network (OSTI)

This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z

459

Detecting atmospheric rivers in large climate datasets  

Science Conference Proceedings (OSTI)

Extreme precipitation events on the western coast of North America are often traced to an unusual weather phenomenon known as atmospheric rivers. Although these storms may provide a significant fraction of the total water to the highly managed western ... Keywords: atmospheric rivers, automatic detection of atmospheric rivers, connected component labeling, extreme climate events

Surendra Byna; Prabhat; Michael F. Wehner; Kesheng John Wu

2011-11-01T23:59:59.000Z

460

Technical Architecture for Transmission Operations and Protection  

Science Conference Proceedings (OSTI)

Transmission systems are a critical power transport backbone and are increasingly necessary for integration of new and more diverse power generation from a variety of sources. In some areas, customers are generating their own power through renewable sources and may have surpluses that get "pushed back" into the power grid. This situation will be further exacerbated with plug-in hybrid vehicles, large wind farms, photovoltaic arrays, and other sources as energy continues to dominate the economy. Transmiss...

2008-12-23T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

IntelliGrid Transmission Architecture Development  

Science Conference Proceedings (OSTI)

Objective Future transmission system operations require the development of a distributed computing infrastructure that can keep up with the demands of new applications as well as the technical pressures being placed on power systems. This project identifies issues related to the supporting communications and distributed computing infrastructures necessary to support the next generation of transmission monitoring, control, and operations. Although substantial work has been completed, more is needed to dev...

2008-03-31T23:59:59.000Z

462

Transmission Line Surge Arrester - White Paper  

Science Conference Proceedings (OSTI)

Electricity customers are continually demanding improved transmission system reliability and performance. In order to improve reliability, utilities must focus on mitigating the effects of lightning, which is often the most frequent cause of transmission outages and service interruptions. The widespread use of electronic equipment at home and at work makes the challenge of providing reliable electrical service greater today than ever before. Customers can be adversely affected by even momentary outages o...

2005-07-27T23:59:59.000Z

463

500-kV Transmission Line Design  

Science Conference Proceedings (OSTI)

The design of an extrahigh-voltage (EHV) transmission line involves an integrated analysis and comparison of influencing factors to develop a structure configuration and conductor/shieldwire system that will provide safe, reliable, and economic service. Many of the parameters in design have varied impacts on the performance characteristics of a transmission line: safety, reliability, capital cost, and lifetime cost. The interdependencies are many and technical in nature. Having a solid knowledge of the p...

2011-02-04T23:59:59.000Z

464

Transmission amplitudes from Bethe ansatz equations  

E-Print Network (OSTI)

We consider the Heisenberg spin chain in the presence of integrable spin defects. Using the Bethe ansatz methodology, we extract the associated transmission amplitudes, that describe the interaction between the particle-like excitations displayed by the models and the spin impurity. In the attractive regime of the XXZ model, we also derive the breather's transmission amplitude. We compare our findings with earlier relevant results in the context of the sine-Gordon model.

Anastasia Doikou; Nikos Karaiskos

2012-12-02T23:59:59.000Z

465

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

466

Managing Transmission Line Steel Structures, Version 2  

Science Conference Proceedings (OSTI)

Utilities are under more pressure than ever to efficiently utilize existing overhead lines by optimizing their life and reliability. A key issue involves the question of how to efficiently inspect and maintain transmission systems. In light of aging transmission and distribution infrastructures, resources are needed to design and implement cost-effective assessment and maintenance programs. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance progr...

2004-12-02T23:59:59.000Z

467

Information Sharing Across Transmission and Distribution Operations  

Science Conference Proceedings (OSTI)

In the real-time operation of the grid, there is a natural dividing line between the bulk power, or transmission, system and the distribution system. The increasing deployment of distributed resourcesincluding distributed energy resources (distributed generation) and curtailable load (demand response)will require update of transmission and distribution system processes and applications that ensure reliable and efficient grid operation. Closer coordination of activities will be necessary as both systems a...

2010-12-22T23:59:59.000Z

468

X-ray transmissive debris shield  

DOE Patents (OSTI)

A composite window structure is described for transmitting x-ray radiation and for shielding radiation generated debris. In particular, separate layers of different x-ray transmissive materials are laminated together to form a high strength, x-ray transmissive debris shield which is particularly suited for use in high energy fluences. In one embodiment, the composite window comprises alternating layers of beryllium and a thermoset polymer.

Spielman, Rick B. (Albuquerque, NM)

1994-01-01T23:59:59.000Z

469

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity  

E-Print Network (OSTI)

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity Alberto E of synaptic transmission: chemical and electrical. While most efforts have been dedicated to the understanding of synaptic transmission: chemical and electrical. In chemical synapses, presynaptic electrical currents

Rash, John E.

470

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission  

E-Print Network (OSTI)

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

471

Modeling Interregional Transmission Congestion in the National Energy Modeling System  

E-Print Network (OSTI)

the Reference Case Overall Transmission Lines Usage in 2025a load center via a DC transmission line such that flows onand interregional transmission lines are built which make up

Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

2006-01-01T23:59:59.000Z

472

PMD-Induced Transmission Penalties in  

E-Print Network (OSTI)

In this paper, we investigate for the first time chromatic dispersion and nonlinearity tolerances in the presence of polarization-mode dispersion (PMD) for polarization-multiplexed (POLMUX) 2 10-Gb/s nonreturn-to-zero (NRZ) transmission. In polarization-multiplexing, the interaction between fiber nonlinearity and PMD can lower the nonlinear tolerance beyond the tolerances evident when considering both transmission penalties separately; the combined penalties are significantly worse than in the case for non-POLMUX transmission. In this paper, we show, through simulations comparing POLMUX with non-POMUX transmission in the presence of nonlinearity, a reduction of about a factor of three in PMD tolerance. In addition, we show that the dispersion tolerance of POLMUX transmission is severely limited in the presence of PMD. For example, a 40-ps differential group delay (DGD) with worst case coupling of the polarization channels into the fiber lowers the dispersion tolerance, resulting in a 1-dB eye-opening penalty (EOP), from 1200 to 450 ps/nm. We conclude that the interaction between PMD, chromatic dispersion, and nonlinearity leads to the worst signal impairments in POLMUX transmission and increases the effort of using polarization-multiplexing as a modulation format.

Polarization-Multiplexed Transmission Van; D. Van Den Borne; Student Member; N. E. Hecker-denschlag; G. D. Khoe; H. De Waardt

2005-01-01T23:59:59.000Z

473

U-pattern hydrostatic transmission control linkage  

Science Conference Proceedings (OSTI)

This patent describes a vehicle having a hydrostatic transmission responsive to a transmission control lever to effect the speed and direction of the vehicle. The hydrostatic transmission has operative modes in forward, neutral and reverse, a console and a transmission control linkage mounted within the console and in communication with the transmission control lever, the transmission control linkage comprising: the console having a generally U-shaped slot formed therein including first and second spaced apart and generally parallel legs and a third leg intersecting the first and second legs; a shaft mounted in the console; a first control plate pivotally mounted on the shaft and having formed thereon a radially outward extending tab containing a slot and a radially outward extending nipple located generally at a right angle to the tab; a second control plate pivotally mounted on the shaft in axially spaced apart relationship to the first control plate and having formed thereon a radially outward extending tab containing a slot. A radially outward extending nipple is located generally at a right angle to the tab and opposite to the nipple of the first control plate; and a shift lever extending through the slot and having a tab form at one end.

King, M.J.

1986-12-02T23:59:59.000Z

474

Smoky Hill and River Valleys  

E-Print Network (OSTI)

.............................................................................3 - 13 Wind Energy and the Meridian Way Wind Farm County. This location is the site of a new wind farm development by Westar Energy, Horizon Wind EnergySmoky Hill and Republican River Valleys Water, Wind, and Economic Development 2008 Field Conference

Peterson, Blake R.

475

Power upgrading of transmission line by combining AC-DC transmission  

Science Conference Proceedings (OSTI)

Long extra high voltage (EHV) ac lines cannot be loaded to their thermal limits in order to keep sufficient margin against transient instability. With the scheme proposed in this project, it is possible to load these lines very close to their thermal ... Keywords: extra high voltage (EHV)transmission, flexible ac transmission system (FACTS), power system computer-aided design(PSCAD), simultaneous ac-dc power transmission

Jarupula Somlal

2010-07-01T23:59:59.000Z

476

HANFORD SITE RIVER CORRIDOR CLEANUP  

SciTech Connect

In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

BAZZELL, K.D.

2006-02-01T23:59:59.000Z

477

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

478

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

479

Transmission Planning: Institutional Issues in the West | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Institutional Issues in the West Transmission Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group by the...

480

Steady state modelling and analysis of flexible AC transmission systems.  

E-Print Network (OSTI)

??As electric utilities move into more competitive generation supply regimes, with limited scope to expand transmission facilities, the optimisation of existing transmission corridors for power (more)

Fuerte Esquivel, Claudio Rubn

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kern river transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

DOE Issues Two Draft National Interest Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations U.S....

482

National Electric Transmission Congestion Study 2006 Area Maps  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission National Electric Transmission Congestion Study Congestion Study Congestion Area Maps Congestion Area Maps U.S. Department of Energy U.S. Department of Energy...

483

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

484

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

485

North Dakota Energy Conversion and Transmission Facility Siting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) North Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) < Back Eligibility...

486

Draft Chapter 4: Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A robust interstate electric transmission network must be developed to enable our electricity future. Draft Chapter 4: Transmission Adequacy More Documents & Publications...

487

Electricity Transmission Congestion Costs: A Review of Recent...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission Congestion Costs: A Review of Recent Reports Electricity Transmission Congestion Costs: A Review of Recent Reports This study reviews reports of congestion...

488

2006 National Electric Transmission Congestion Study and Related...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section...

489

EIA - Natural Gas Pipeline Network - Natural Gas Transmission...  

Annual Energy Outlook 2012 (EIA)

Transmission Path Diagram About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Transmission Path Natural...

490

Integrating Renewable Energy into the Transmission and Distribution...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Integrating Renewable Energy into the Transmission and Distribution System of...

491

Definition: Open Access Transmission Tariff | Open Energy Information  

Open Energy Info (EERE)

navigation, search Dictionary.png Open Access Transmission Tariff Electronic transmission tariff accepted by the U.S. Federal Energy Regulatory Commission requiring the...

492

2012 Transmission and Energy Storage Peer Review Presentations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission and Energy Storage Peer Review Presentations Available 2012 Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis...

493

EIS-0325: Schultz-Hanford Area Transmission Line Project Final...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003) EIS-0325: Schultz-Hanford Area Transmission Line Project...

494

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

495

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion,...

496

EA-1960: Townsite Solar Project Transmission Line, Clark County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management,...

497

PP-22-4 British Columbia Transmission Corporation  

Energy.gov (U.S. Department of Energy (DOE))

Presidential permit authorizing British Columbia Transmission Corporation to construct, operate, and mantain electric transmission facilities at the U.S-Canadian border.

498

Transmission/Resource Library/Enviromental Resources and Mitigation...  

Open Energy Info (EERE)

Resources and Mitigation < Transmission | Resource Library(Redirected from TransmissionResource LibraryMitigation) Redirect page Jump to: navigation, search REDIRECT...

499

Green Island Power Authority Transmission Voltage Support System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Island Power Authority Transmission Voltage Support System Project Green Island Power Authority Transmission Voltage Support System Project Power point presentation...

500

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...