Powered by Deep Web Technologies
Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

(DOE/EIS-0285/SA-5): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

March 30, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-5) - Big Eddy-Ostrander...

2

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

3

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

4

Supplement 15, Parasite-Subject Catalogue, Subject Headings, Treatment  

E-Print Network [OSTI]

.S. Government Printing Office, Washington, D.C., 20402 - Price 35 cents PREFACE A revision of the Author Catalogue of the Index-Catalogue of Medical and Veterinary Zoology, consisting of Parts 1-18, was published during the period 1932-1952. Beginning... in 1953, a series of supplements designed to pub- lish the backlog was initiated. This was completed with Supplement 6, pub- lished in 1956 ; since then supplements covering authors A-Z have been issued on an annual basis. Beginning with the present...

Humphrey, Judith M.; Segal, Dorothy B.; Beard, Mary I.; Edwards, Shirley J.; Kirby, Margie D.

1966-01-01T23:59:59.000Z

5

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)  

Broader source: Energy.gov (indexed) [DOE]

(8-89) memorandum DATE: 7/19/02 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70) Bill Erickson - TFP/Walla Walla Natural Resource Specialist TO: Proposed Action: Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). Location: The ROWs are located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions.

6

Supplement 21, Part 6, Parasite-Subject Catalogue: Subject Headings and Treatment  

E-Print Network [OSTI]

., 1973 b Entamoeba histolytica, effects of estrogen on hepatic amoebic abscess, hamsters j possibly responsible for lower frequency of abscess in women Abscess Tsai, S.H., 1973 a human hepatic amoebiasis, review of treatments used over 18 years...index Section UNITED STATES DEPARTMENT OP AGRICULTURE CATALOGUE OP MEDICAL AND VETERINARY ZOOLOGY SUPPLEMENT 21, PART 6 PARASITE-SUBJECT CATALOGUE : SUBJECT HEADINGS AND TREATMENT RECEIVED ! IPP?PV MAY 02 1963 IME UNIVERSITY 0? TEXAS HEAI...

Hood, Martha W.; Rayburn, Jane D.

1976-01-01T23:59:59.000Z

7

Supplement 19, Part 6, Parasite-Subject Catalogue: Subject Headings And Treatment  

E-Print Network [OSTI]

UNITED STATES DEPARTMENT OF AGRICULTURE i INDEX-CATALOGUE OF MEDICAL AND VETERINARY ZOOLOGY SUPPLEMENT 19, PART 6 PARASITE-SUBJECT CATALOGUE: SUBJECT HEADINGS AND TREATMENT By MARTHA L. WALKER, Zoologist JANE D. RAYBURN, Technical Information... Specialist JUDITH HUMPHREY SHAW, Zoologist MARGIE D. KIRBY, Technical Information Specialist SHIRLEY J. EDWARDS, Technical Information Specialist ANIMAL PARASITOLOGY INSTITUTE AGRICULTURAL RESEARCH SERVICE Issued March 1974 U.S. GOVERNMENT PRINTING...

Walker, Martha L.; Rayburn, Jane D.; Shaw, Judith H.; Kirby, Margie D.; Edwards, Shirley J.

1974-01-01T23:59:59.000Z

8

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

9

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

10

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

11

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

12

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Broader source: Energy.gov (indexed) [DOE]

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

13

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

14

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Schultz - Raver No.1 and 2 from 60/3 to 75/5 and the Olympia - Grand Coulee from 70/2 to 70/5 Transmission Line ROW's. Location: The ROW is located in King County, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and along access roads that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety

15

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26)(9/11/01)  

Broader source: Energy.gov (indexed) [DOE]

11, 2001 11, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management on Reedsport-Fairview #1 Transmission Line Structure 1/5 to 39/4. Location: All ROW are located in Coos and Douglas Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

16

(DOE/EIS-0285/SA-07): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/18/01  

Broader source: Energy.gov (indexed) [DOE]

18, 2001 18, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. Location: All ROW are located east Umatilla, OR., all being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

17

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17)(7/24/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: July 24, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along selected sections of the Schulz - Raver No.1, 2, 3 & 4, Olymplia - Grand Coulee NO. 1 Transmission Line ROW's. Location: The ROW's are located in Pierce and King Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety Code and BPA

18

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Broader source: Energy.gov (indexed) [DOE]

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

19

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Broader source: Energy.gov (indexed) [DOE]

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

20

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Broader source: Energy.gov (indexed) [DOE]

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

(DOE/EIS-0285-SA-115): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Shelton-Fairmount # 1-4 12/20/02  

Broader source: Energy.gov (indexed) [DOE]

0, 0, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 115, Shelton- Fairmount # 1-4. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2 (reference line ADNO 8354). Right of way width averages 258 feet. Location: The project area is located in Jefferson County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and

22

(DOE/EIS-0285/SA-121): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121): 2/12/03  

Broader source: Energy.gov (indexed) [DOE]

2, 2003 2, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121 Murry-Custer No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Murry-Custer No.1 transmission line from structure 1/1 through structure 6/2. Corridor width is 125 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 77.5 acres of right-of-way, 6 miles of access road, and 48 structure sites will be

23

(DOE/EIS-0285/SA-110): Supplement Analysis for the Transmission System Vegetation Management Program FEIS-Covington-Columbia No. 3) 10/2/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-110-Covington-Columbia No. 3 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Covington-Columbia No. 3, 230kV transmission lines from structure 1/1 through structure 12/1. Corridor width varies from 150 feet to 537.5 feet. The project area is located within King County, Washington. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 568.4 acres of the right-of-way will be treated using selective and non-selective methods that include

24

(DOE/EIS-0285/SA-99): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Olympia-Grand Coulee No.1 8/29/02  

Broader source: Energy.gov (indexed) [DOE]

9, 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-99-Olympia-Grand Coulee No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Olympia-Grand Coulee No. 1, 287 kV transmission line from structure 53/4 through structure 64/1. Corridor width is 125 feet. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 163 acres will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded

25

(DOE/EIS-0285/SA-114): Supplement Analysis for the Transmission System Vegetation Management Program EIS (Chehalis-Raymond #1, ADNO 8114) 12/5/02  

Broader source: Energy.gov (indexed) [DOE]

December December 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-114) (Chehalis-Raymond #1, ADNO 8114) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Chehalis-Raymond #1 115 kV transmission line Location: Project location is within Lewis and Pacific counties, Washington and is within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources

26

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1)(3/19/03)  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1) Libby Johnson Natural Resource Specialist - TFR/THE DALLES Proposed Action: Vegetation Management for portion of the Big Eddy - Ostrander #1 500 kV transmission line located from tower structure 31/2 to 39/3. Location: Project location is in BPA Redmond Region in Hood River County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete

27

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1)  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Captain Jack-Malin #1 500 kV transmission line from structure 2/4 to Malin Substation (reference line). Right of way width averages 150 feet. Location: The project location is within Klamath County, Oregon near the city of Malin, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors.

28

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

29

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-146-Custer-Ingledow No.1&2  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-146-Custer-Ingledow No.1&2 Don Atkinson Natural Resource Specialist - TFN/Snohomish Proposed Action: Vegetation Management for portion of the Custer-Ingledow No.1&2 500 kV transmission line located from tower structure 1/4 to 9/6. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete

30

(DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02  

Broader source: Energy.gov (indexed) [DOE]

July July 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 84 Monroe-Custer No.l Don Atkinson -- - TFN/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the

31

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Broader source: Energy.gov (indexed) [DOE]

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

32

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

33

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Broader source: Energy.gov (indexed) [DOE]

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

34

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/13/01  

Broader source: Energy.gov (indexed) [DOE]

4/13/01 4/13/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation. Location: The pastureland is adjacent to the Walla Walla Substation and is located east and north of the fenced substation, all within the BPA property boundary. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also

35

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Broader source: Energy.gov (indexed) [DOE]

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

36

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

37

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Broader source: Energy.gov (indexed) [DOE]

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

38

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

39

(DOE/EIS-0285/SA-56): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/9/02  

Broader source: Energy.gov (indexed) [DOE]

09, 2002 09, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-56) 2ULRQ $OEUR 2O\PSLD 5HJLRQDO 0DQDJHU Proposed Action: Vegetation Management for the following electric yards located in the Ross District: Cape Horn North Bonneville Stevenson Carson Underwood Troutdale Cascade Locks Acton Ross 345kV and J.D. Alcoa Sifton St. Johns Ostrander McLoughlin Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region's Ross District. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical

40

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/9/01  

Broader source: Energy.gov (indexed) [DOE]

3/09/01 3/09/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-02) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Danger tree clearing on nine ROWs. Locations are: the Franklin-Badger Canyon #2; Hedges Tap; White Bluffs-Richland; Grandview-Richland; Badger Canyon-Richland; Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

(DOE/EIS-0285/SA-64): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/26/02  

Broader source: Energy.gov (indexed) [DOE]

6, 2002 6, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-64) Truman Conn - TFP Regional Manager, Walla Walla Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities in the Walla Walla Region (See Attachment A for a complete list of facilities) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities

42

(DOE/EIS-0285/SA-08): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/23/01  

Broader source: Energy.gov (indexed) [DOE]

23, 2001 23, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08 Don Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Clearing C-trees along the south side of the right-of-way. Location: Raver - Covington Line 1, between towers 6/5 and 7/2. Work will be performed in the State of Washington. Proposed by: BPA Snohomish Region. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). Planning Steps 1. Identify facility and the vegetation management need. The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All

43

(DOE/EIS-0285/SA-15): Supplement Analysis for the Transmission System Vegetation Manaement Program FEIS 6/19/01  

Broader source: Energy.gov (indexed) [DOE]

United States Government Department of Energy Bonneville Power Administration DATE: June 19, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management on selected sections of ROWs in the Ross-St. John and Ross-Carborundum transmission line ROWs. The ROWs include sections of the Ross-St. John 230Kv line; the Ross-Rivergate 230Kv line; the Ross-Alcoa 115Kv line; the Ross-Carborundum 115Kv line and the Clark PUD 115Kv line. Location: The ROWs span sections of Vancouver Washington and Portland Oregon and are all

44

(DOE/EIS-0285/SA-123): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/20/03  

Broader source: Energy.gov (indexed) [DOE]

20, 2003 20, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123 Malin-Hilltop Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Malin-Hilltop (Structures 20/5-29/1). Location: The project area lies to the southeast of Klamath Falls, OR, and is located in Modoc County, California. Proposed by: Bonneville Power Administrationn (BPA) Description of the Proposed Action: Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on

45

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 10/22/01  

Broader source: Energy.gov (indexed) [DOE]

October 22, 2001 October 22, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-27) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. Location: All ROW are located in Marion, Linn, and Lane Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways, around tower structures, and associated access roads that may impede the operation and

46

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line 9/30/02  

Broader source: Energy.gov (indexed) [DOE]

30, 30, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. Right of way width is 150 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads

47

(DOE/EIS-0285-SA-104): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Lynch Creek Tap to LaGrande-Cowlitz No.1 8/21/02  

Broader source: Energy.gov (indexed) [DOE]

1, 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-104-Lynch Creek Tap to LaGrande-Cowlitz No. 1 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1 Location: Near the town of Eatonville, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required

48

EIS(DOE/EIS-0285/SA-61) Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/15/02  

Broader source: Energy.gov (indexed) [DOE]

April 15, 2002 April 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-61 Tom Murphy - TFS/Bell-1 - Natural Resource Specialist Proposed Action: Vegetation Management along the Bell-Boundary No.3, 84/4 to 96/1 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 100 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Stevens and Pend Oreille County, WA, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-

49

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129) Ashe-Marion #2 [Mile 150-157]  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129 Ashe-Marion #2 [Mile 150-157] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7 (reference line). The Buckley-Marion #1 transmission line is also present within the proposed corridor. Right of way width averages 135 feet. Location: The project location is within Wasco County, Oregon near the city of Pine Grove, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

50

DOE/EIS-0285/SA-134: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Bandon-Rogue-GoldBeach)(3/24/03)  

Broader source: Energy.gov (indexed) [DOE]

4, 2003 4, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-134-Bandon-Rogue-GoldBeach) Ben Tilley Natural Resource Specialist - TFE/Alvey Proposed Action: Vegetation Management for the Bandon-Rogue-Gold Beach transmission line corridor. This corridor includes the Bandon-Rogue #1 115 kV transmission line from Bandon Substation to Rogue Substation and the Rogue-Gold Beach #1 and #2 115kV transmission lines, starting at Rogue Substation and ending at Gold Beach Substation. In addition the project includes adjacent portions of the Fairview-Rogue #1 230 kV Transmission Line. Location: The project is located in the BPA Eugene Region, Coos and Curry Counties, Oregon.

51

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1 Ed Tompkins Natural Resource Specialist-TFO/LMT Proposed Action: Removal of danger trees along the Big Eddy-Ostrander-1 transmission line corridor. This corridor also includes segments of the Big Eddy-Troutdale, Ostrander-Troutdale, Big Eddy-McLoughlin and Bid Eddy-Chemawa transmission lines. Referencing the Big-Eddy- Ostrander-1 transmission line, the project extends from tower 39/3 to 72/2. The portion of the ROW extending from 39/3 west to 44/5+313 falls within the Zigzag Ranger District of the Mt. Hood National Forest, Clackamas County, Oregon. All work conducted

52

DOE/EIS-0285/SA-101: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Spokane Region (9/13/02)  

Broader source: Energy.gov (indexed) [DOE]

13, 13, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-101) Spokane Region Michael F. Brock - TFS/BELL-1 Regional Manager, Spokane Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities (See Attachment A for a complete list of facilities) Location: Spokane Region. (See Attachment A) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare

53

(DOE/EIS-0285/SA-63): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanford-Ostrander 4/22/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2002 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanvor-Ostrander (DOE/EIS-0285/SA-63) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the North Bonneville-Midway and Hanford- Ostrander transmission line right-of-way (approx. 702 acres). The project area begins at the North Bonneville Substation and terminates at structure 25/3+500. For most of the length of the right-of-way, the width is 300 feet wide on the North Bonneville-Midway Line and 150 feet wide for the Hanford- Ostrander Line. Location: The ROW is located in North Bonneville, Skamania County, OR, being in the

54

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-148- McNary Wildlife (McNary-Santiam #2))  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-148- McNary Wildlife (McNary-Santiam #2)) Mark Newbill - TFE/Chemawa Proposed Action: Joint project with US Forest Service for vegetation control for the McNary- Santiam #2 230 kV transmission line that enhances wildlife habitat under powerlines. Location: The project is located in the BPA Eugene Region within Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA) in cooperation with US Forest Service. Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way by hand cutting or machine mowing. The overall goal is to remove small fir trees, brushy

55

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook)(3/10/03)  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler Tillamook 115 kV transmission line from structure 1/7 through structure 58/2, and along adjacent portions of the Keeler-Forest Grove #2 115KV transmission line. In addition the project includes 11miles of the 115KV Timber Tap. Location: The project is located in the BPA Eugene Region, Tillamook and Washington Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

56

DOE/EIS-0285/SA-133: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Hanford-Ostrander [Mile 126/1-146/4] (3/20/03)  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-133 Hanford-Ostrander [Mile 126/1-146/4] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. Location: The project location is within Skamania County, Washington. The project commences to the west of the White Salmon River and proceeds in a westerly directly for approximately 20 miles. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

57

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-147 (Big Eddy-Chenoweth NO. 1&2, Big Eddy - Midway & Chenoweth-Goldendale)  

Broader source: Energy.gov (indexed) [DOE]

1, 2003 1, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-147 (Big Eddy-Chenoweth NO. 1 &2, Big Eddy - Midway & Chenoweth- Goldendale) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Big Eddy-Chenoweth NO. 1 &2 Substation to Substation, Big Eddy - Midway Substation to 2/3) & Chenoweth-Goldendale (Substation to 2/3). Location: Project location is within Wasco County, Oregon & Klickitat County, Washington and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of-way.

58

Supplement 17, Part 5, Parasite-Subject Catalogue, Parasites: Arthropoda And Miscellaneous  

E-Print Network [OSTI]

UNITED STATES DEPARTMENT OF AGRICULTURE INDEX-CATALOGUE OF MEDICAL AND VETERINARY ZOOLOGY SUPPLEMENT 17, PART 5 PARASITE-SUBJECT CATALOGUE PARASITES: ARTHROPODA AND MISCELLANEOUS PHYLA UNITED STATES DEPARTMENT OF AGRICULTURE INDEX...-CATALOGUE OF MEDICAL AND VETERINARY ZOOLOGY SUPPLEMENT 17, PART 5 PARASITE-SUBJECT CATALOGUE PARASITES: ARTHROPODA AND MISCELLANEOUS PHYLA By DOROTHY B. SEGAL, Zoologist JUDITH M. HUMPHREY, Zoologist SHIRLEY J. EDWARDS, Technical Information Specialist MARGIE...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1969-01-01T23:59:59.000Z

59

Supplement 24, Part 6, Parasite-Subject Catalogue, Subject Headings: J To Z  

E-Print Network [OSTI]

Agricultural Library, Belts ville, Maryland; Wm = National Library of Medicine, Bethesda, Maryland; Wc = Library of Con- gress, Washington, D.C.; etc. A key to these library symbols may be found in Supplements 10 and 20. A list of serial abbreviations... cycle of T. brucei Korea Cho KM et al 1976 Yonsei Rep Trop Med 7 (1) Nov 17-25 Wm human intestinal parasites, prevalence survey Sochong-do Island, Korea Korea Soh CT 1978 Yonsei Rep Trop Med 9 (1) Nov 1-10 Wm snail-mediated parasites, vectors...

Edwards, Shirley J.; Hood, Martha W.; Shaw, Judith H.; Rayburn, Jane D.; Kirby, Margie D.; Hanfman, Deborah T.; Zidar, Judith A.

1982-01-01T23:59:59.000Z

60

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA - 128 - Olympia-Satsop #3 [Mile1-6]  

Broader source: Energy.gov (indexed) [DOE]

6, 2003 6, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 128 - Olympia-Satsop #3 [Mile 1-6] James Jellison Natural Resource Specialist - TFO/Olympia Proposed Action: Vegetation Management for the Olympia-Satsop #3 230 kV transmission line corridor (reference line) from structure 1/1 through structure 6/1 and between structures 8/3 and 8/4. Other lines which are present in the proposed corridor are the Paul-Satsop #1 500 kV, Olympia-Satsop #2 500 kV, Olympia-South Elma #1 115 kV, Olympia-Kitsap #3 230 kV, Olympia-Shelton #3 230 kV, Olympia-Shelton #4 230 kV, and Olympia-Shelton #1 115 kV. Right of way width averages 615 feet. Location: The project location is within Thurston County, Washington and is within the

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Supplement 23, Part 6, Section B. Subject Headings: J-Z, Parasite-Subject Headings and Treatment  

E-Print Network [OSTI]

by the Department over other products not mentioned. SUBJECT HEADINGS 583 Japan Kagei, N., 1973, Snake, v. 5 (1-2), 141-150 macroscopic endoparasites of snakes recorded in Japan Japan Kamiya, H.; et al., 19 73, Japan. J. Vet. Re- search, v. 21 (3), 51... African Med. J., v. 55 (il), 402 [Letter] amoebic liver abscess in patients presenting with jaundice or raised serum bilirubin, suggestions for management Jaundice Hirsch, R. P., 1979, Internat. J. Parasitol., v. 9 (5), 395-399 Histomonas...

Hood, Martha W.; Hanfman, Deborah T.; Edwards, Shirley J.; Rayburn, Jane D.; Kirby, Margie D.; Zidar, Judith A.; Shaw, Judith H.

1982-01-01T23:59:59.000Z

62

Supplement 24, Part 3, Parasite-Subject Catalogue, Parasites: Trematoda and Cestoda  

E-Print Network [OSTI]

Agricultural Library, Beltsville, Maryland; Wm = National Library of Medicine, Bethesda, Maryland; Wc = Library of Con- gress, Washington, D.C. ; etc. A key to these library symbols may be found in Supplements 10 and 20. A list of serial abbreviations... of the unicorn. This desert antelope became virtually extinct in the early 1960s. At that time several groups of international conservationists arranged to have 9 animals sent to the Phoenix Zoo to be the nucleus of a captive breeding herd. Today the Oryx...

Edwards, Shirley J.; Hood, Martha W.; Shaw, Judith H.; Rayburn, Jane D.; Kirby, Margie D.; Hanfman, Deborah T.; Zidar, Judith A.

1982-01-01T23:59:59.000Z

63

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

29, 2014 1 MP No. 741 Subject: SOL heat and particle transport studies of inner-wall limited discharges From: J.L. Terry, B. LaBombard, R. Pitts (IO), M. Kocan (IO), C. Theiler, S....

64

Microsoft Word - CX-Coos-CurryNorwaySubstation_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Shari Sundeen Public Utilities Specialist - TPC-TPP-4 Proposed Action: Line and load interconnection of...

65

Microsoft Word - CX-Hanford-Wautoma_Spacers_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

DATE: April 23, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Program Management Engineer - TELM-TPP-3 Proposed Action: Spacer replacement...

66

Microsoft Word - FEIS-0421-SA-01-Big Eddy-KnightDesignAdjustmentFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Big Eddy-Knight Transmission Project Final EIS (DOE/EIS-0421/SA-1) Emmanuel Jaramillo Project Manager - TEP-TPP-1 Proposed Action: Big Eddy-Knight Transmission Project design adjustments Proposed by: Bonneville Power Administration (BPA) Location: Wasco County, Oregon and Klickitat County, Washington Background: In 2011, BPA completed the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421) and issued a Record of Decision (ROD) documenting its decision to build and operate the Big Eddy-Knight transmission line. Construction of the transmission line began in fall 2011 and is currently underway. Through construction and further detailed design work, project adjustments have been identified. The

67

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Supplemental Tables to the Annual Energy Outlook 2005 Supplemental Tables to the Annual Energy Outlook 2005 EIA Glossary Supplemental Tables to the Annual Energy Outlook 2005 Release date: February 2005 Next release date: February 2006 The AEO Supplemental tables were generated for the reference case of the Annual Energy Outlook 2005 (AEO2005) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 2003 to 2025. Most of the tables were not published in the AEO2005, but contain regional and other more detailed projections underlying the AEO2005 projections. The files containing these tables are in spreadsheet format. A total of one hundred and seventeen tables is presented. The data for tables 10 and 20 match those published in AEO2005 Appendix tables A2 and A3, respectively. Forecasts for 2003-2005 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term forecasts and are based on more current information than the AEO.

68

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format. Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format. MS Excel Viewer Spreadsheets are provided in excel Errata - August 25, 2004 1 to117 - Complete set of of Supplemental Tables PDF Table 1. Energy Consumption by Source and Sector (New England) XLS PDF Table 2. Energy Consumption by Source and Sector (Middle Atlantic) XLS PDF Table 3. Energy Consumption by Source and Sector (East North Central) XLS PDF Table 4. Energy Consumption by Source and Sector (West North Central) XLS PDF Table 5. Energy Consumption by Source and Sector (South Atlantic) XLS PDF Table 6. Energy Consumption by Source and Sector (East South Central) XLS PDF Table 7. Energy Consumption by Source and Sector (West South Central) XLS PDF Table 8. Energy Consumption by Source and Sector (Mountain)

69

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

5 5 Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format Excel logo Spreadsheets are provided in excel 1 to117 - Complete set of Supplemental Tables PDF Energy Consumption by Sector (Census Division) Table 1. New England XLS PDF Table 2. Middle Atlantic XLS PDF Table 3. East North Central XLS PDF Table 4. West North Central XLS PDF Table 5. South Atlantic XLS PDF Table 6. East South Central XLS PDF Table 7. West South Central XLS PDF Table 8. Mountain XLS PDF Table 9. Pacific XLS PDF Table 10. Total United States XLS PDF Energy Prices by Sector (Census Division) Table 11. New England XLS PDF Table 12. Middle Atlantic XLS PDF Table 13. East North Central XLS PDF Table 14. West North Central XLS PDF Table 15. South Atlantic XLS PDF Table 16. East South Central

70

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Annual Energy Outlook 1999 Annual Energy Outlook 1999 bullet1.gif (843 bytes) Assumptions to the AEO99 bullet1.gif (843 bytes) NEMS Conference bullet1.gif (843 bytes) Contacts bullet1.gif (843 bytes) To Forecasting Home Page bullet1.gif (843 bytes) EIA Homepage supplemental.gif (7420 bytes) (Errata as of 9/13/99) The AEO Supplementary tables were generated for the reference case of the Annual Energy Outlook 1999 (AEO99) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 1997 to 2020. Most of the tables were not published in the AEO99, but contain regional and other more detailed projections underlying the AEO99 projections. The files containing these tables are in spreadsheet format. A total of ninety-five tables are presented.

71

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

December 22, 2000 (Next Release: December, 2001) Related Links Annual Energy Outlook 2001 Assumptions to the AEO2001 NEMS Conference Contacts Forecast Homepage EIA Homepage AEO Supplement Reference Case Forecast (1999-2020) (HTML) Table 1. Energy Consumption by Source and Sector (New England) Table 2. Energy Consumption by Source and Sector (Middle Atlantic) Table 3. Energy Consumption by Source and Sector (East North Central) Table 4. Energy Consumption by Source and Sector (West North Central) Table 5. Energy Consumption by Source and Sector (South Atlantic) Table 6. Energy Consumption by Source and Sector (East South Central) Table 7. Energy Consumption by Source and Sector (West South Central) Table 8. Energy Consumption by Source and Sector (Mountain)

72

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Homepage Homepage Supplement Tables to the AEO2001 The AEO Supplementary tables were generated for the reference case of the Annual Energy Outlook 2001 (AEO2001) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 1999 to 2020. Most of the tables were not published in the AEO2001, but contain regional and other more detailed projections underlying the AEO2001 projections. The files containing these tables are in spreadsheet format. A total of ninety-five tables is presented. The data for tables 10 and 20 match those published in AEO2001 Appendix tables A2 and A3, respectively. Forecasts for 1999 and 2000 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term forecasts and are based on more current information than the AEO.

73

SUPPLEMENT ANALYSIS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

812 Supplement Analysis 1 October 2013 812 Supplement Analysis 1 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Customer Service Region OCTOBER 2013 DOE/EA-1812/SA-1 DOE/EA-1812 Supplement Analysis 2 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration

74

SUPPLEMENT ANALYSIS  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis 1 October 2013 Supplement Analysis 1 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Customer Service Region OCTOBER 2013 DOE/EA-1812/SA-1 DOE/EA-1812 Supplement Analysis 2 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration

75

Supplement 15, Parasite-Subject Catalogue: Hosts  

E-Print Network [OSTI]

., I96I b, 94 Rumania Bechet, I. Rumania 1956 a, 1^3 Shul1 man, S. S., in Bykhov- skii, ?. E., 1962 a, 96 Amu-Darya river basin (Var- zob & Liuchob rivers) Getsevichiute, S. Iu., 1958 a 125-126 Chloromyxum cristatum (gall bladder) Myxidium...., I96I b, 94 Rumania Bechet, I. Rumania 1956 a, 1^3 Shul1 man, S. S., in Bykhov- skii, ?. E., 1962 a, 96 Amu-Darya river basin (Var- zob & Liuchob rivers) Getsevichiute, S. Iu., 1958 a 125-126 Chloromyxum cristatum (gall bladder) Myxidium...

Humphrey, Judith M.; Segal, Dorothy B.; Beard, Mary I.; Edwards, Shirley J.; Kirby, Margie D.

1966-01-01T23:59:59.000Z

76

Enforcement Guidance Supplement 01-01, Nuclear Weapon Program...  

Office of Environmental Management (EM)

OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for...

77

EIS-0285-SA-103: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

structures that may impede the operation and maintenance of the subject transmission line. DOeEIS-0285, Bonneville Power Administration, Supplemental Analysis for...

78

Enforcement Guidance Supplement  

Broader source: Energy.gov (indexed) [DOE]

EGS:01-02 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 17, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 01-02: Management and Independent Assessment Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on DOE contractors.

79

Subject Index  

Science Journals Connector (OSTI)

The Subject Index provides an alphabetical subject key to the papers abstracted in Astronomy and Astrophysics Abstracts. In order to explain the structure of this Index some general remarks on the construction pr...

G. Burkhardt; U. Esser; H. Hefele; Inge Heinrich…

1994-01-01T23:59:59.000Z

80

Microsoft Word - CX-PortAngeles-Sappho-AR-FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on the Port Angeles-Sappho No....

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Clark et al., Supplemental Data SUPPLEMENTAL DATA  

E-Print Network [OSTI]

was then aliquoted to the PCR plate. Primer sequences: #12;Clark et al., Supplemental Data p. 2 C10_RT

Ptak, Susan

82

Enforcement Guidance Supplement (EGS) 00-04  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS: 00-04 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 October 23, 2000 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-04: Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C DOE' s Operational Procedures for Enforcement (June 1998), which supercede the DOE Enforcement Handbook (1087-95), provides the Office of Enforcement and Investigation with the opportunity to issue interim enforcement guidance from time to time with

83

Montani, Kohn, Smith and Schultz (2006), Supplemental Material Supplemental Material  

E-Print Network [OSTI]

Montani, Kohn, Smith and Schultz (2006), Supplemental Material 1 Supplemental Material A. Entropy, Kohn, Smith and Schultz (2006), Supplemental Material 2 occupied, it is ambiguous whether

Smith, Matthew A.

84

Figure legends supplemental figures Supplemental figure 1.  

E-Print Network [OSTI]

; Kruskal-Wallis-test). Supplemental figure 3. (a) Survival of GFAPcre+/VHL+f/+f /VEGF+f/+f mice (n=19

Kleinfeld, David

85

Subject: References:  

Broader source: Energy.gov (indexed) [DOE]

Subject: Subject: References: DEAR 970.3102-2 Compensation for personal services DEAR 970.5204-13 Allowable costs and fixed-fee (Management and operating contracts) DEAR 970.5204-14 Allowable costs and fixed-fee (support contracts) When is this ~\.cquisition Letter (AL) Effective? This AL is effective 10 days from the date of issuance. This gui~ce supersedes any previous statutory cap on executive compensation. Existing contracts need to be reviewed to determine whether contract terms and conditions are consistent with the guidance in this AL, or whether contract modifications are necessary. When Does this AL Expire? This AL remain;; in effect until superseded or canceled. Whom do you Contact for More Information? Contact the Office of Procurement and Assistance Policy, for questions pertaining to the

86

MEMORANDUM SUBJECT:  

Office of Legacy Management (LM)

/ /' MEMORANDUM SUBJECT: ---------------------- OWNER (S) -------- Past I ------------------------ Current: -------------------------- Owner contacted 0 yes 0 no; if yes, date contrctrd ----B-m------ TYPE OF OPERATION ----------------- &Research & Development x Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis ti Production 0 Disposal/Storage K tlmuf 8cturinq 0 University Research 0 Organization 0 Government Sponsored Facility 0 Other -------------------- TYPE OF CONTRACT ---------------- 0 Prime 0 Subcontract& 0 Purchase Order 0 Other information (i.e., cost + fixed fee, unit price, time & material, rtc) ----w-B ---------------------------- Contract/Purchase Order #

87

HEHORANDUU SUBJECT:  

Office of Legacy Management (LM)

HEHORANDUU HEHORANDUU SUBJECT: .I CILTERNATE Pastr________________________ Current:~ -------------------_______ Owner contacted q yes anof if yes, dets contacted IKLE-!PEE_nILm! q Research & Development 0 Production scale testing 0 Pilot Scale q Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis 0 Product i on 0 Disposal/Storage .u Facility Type 0 Uanufacturing q University 0 Research Organization 0 ' Government Sponsored Facility 0 Other --------------------- 0 Prime cl 0 Subcontract& Other information (i.e., cost + fixed fee, unit price, 0 Purchase Order time 81 material, etc) Contract/Purchase Order # -------------------------- OWNERSHiP CIEC/tlED AEC/HED sow owk!m LE_n_sEB OkwE LANDS BUILDINGS EQUIPMENT i z E ORE OR RAW HATL 0 iY i

88

EIS-0285-SA-119: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis 9: Supplement Analysis EIS-0285-SA-119: Supplement Analysis Transmission System Vegetation Management Program, Snohomish-Murray No. 1 Transmission Line Bonneville Power Administration proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will be cleared. Approximately 136 tower sites will be treated. Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119) Snohomish-Murray No. 1 Transmission Line (January 2003) More Documents & Publications EIS-0285-SA-125: Supplement Analysis EIS-0285-SA-124: Supplement Analysis

89

Supplementation in the Columbia Basin : Summary Report Series : Final Report.  

SciTech Connect (OSTI)

This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first of a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning supplementation projects (11) application of the spreadsheet model to supplementation planning; and (12)

United States. Bonneville Power Administration.

1992-12-01T23:59:59.000Z

90

2.1E Supplement  

E-Print Network [OSTI]

may include supplemental electric resistance heaters in heatof supplemental electric resistance heaters in heat pumps.frost is melted using electric resistance heat. The capacity

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

91

Supplement 21, Part 7, Parasite-Subject Catalogue, Hosts  

E-Print Network [OSTI]

Caligus malabaricus: Torres Strait off Northern Australia Caligus sp. A: Sierra Leone; Gabon Caligodes laciniatus: Florida; Caribbean Sea; off Mississippi coast; off Surinam; off northern Brazil; Cape Verde Islands; Gulf of Guinea; off Sierra Leone...

Zidar, Judith A; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1978-01-01T23:59:59.000Z

92

Supplement 22, Part 2, Parasite-Subject Catalogue, Parasites: Protozoa  

E-Print Network [OSTI]

micro- scopy, differential diagnosis, embedding and staining technique Acanthamoeba sp., illus. Ringsted, J.; et al., 1976, Am. J. Clin. Path., v. 66 (4), 723-730 disseminated amebic meningoencephalitis prob- ably due to Acanthamoeba sp., visceral... with cells from infection, surface micro appendages, possible use of SEM in diagnosis Acanthamoeba culbertsoni Cursons, R. T. M.; and Brown, T. J., 1976, N. Zealand J. Marine and Freshwater Research, v. 10 (2), 245-262 pathogenic free-living amebae...

zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1980-01-01T23:59:59.000Z

93

Supplement 23, Part 7, Parasite-Subject Catalogue, Hosts  

E-Print Network [OSTI]

Parasitol. Polon., v. 25 (11-20), 129-134 Leucochloridium vogtianum: Poland Acropora palmata Stock, J. H., 1975, Studies Fauna Curacao and Carib. Is. (Wagenaar Hummelinck, P.), v. 47, 1-45 (Natuurwetensch. Studiek. Suriname en Nederlandse Antillen (83...

Edwards, Shirley J.; Hood, Martha W.; Shaw, Judith H.; Rayburn, Jane D.; Kirby, Margie D.; Hanfman, Deborah T.; Zidar, Judith A.

1982-01-01T23:59:59.000Z

94

Supplement 23, Part 2, Parasite-Subject Catalogue, Parasites: Protozoa  

E-Print Network [OSTI]

mansoni susceptible and resistant strains) (pericardium, mantle), in vitro killing of S. mansoni sporocysts by amoebae; whether amoebae contribute to snail resistance is un- known Acanthamoeba Willaert, E., 1974, Ann. Soc. Beige Med. Trop., v. 54 (4-5...-pathogenic Acanthamoeba cysts, transmission and scanning electron microscopy Acanthamoeba astronyxis Gullet, J.; et al., 1979, Am. J. Med., v. 67 (5), 891-896 Acanthamoeba astronyxis, Mexican woman, fatal case of disseminated granulomatous in- fection with skin...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1982-01-01T23:59:59.000Z

95

Supplement 22, Part 7, Parasite-Subject Catalogue, Hosts  

E-Print Network [OSTI]

. (Type E) Contracaecum sp. (Type F) Terranova sp. (Type B) Raphidascaris sp. all from South China Sea Ablabesmyia (exper.) Schell, S. ?., 1975, J. Parasitol., v. 61 (5), 899-905 Plagioporus shawi [n. comb.] Abramis brama (coeloma) Jakutowicz, K... perfecta all from Caribbean Sea off Belize Acanthurus chirurgus "doctorfish" Schmidt, G. D., 1975, J. Parasitol., v. 61 (5), 865-867 Acanthosentis acanthuri Acanthobrama marmid (blood) Warsi, ?. ?.; and Fattohy, ?. I., 1976, Current Sc., Bangalore...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1981-01-01T23:59:59.000Z

96

Supplement 20, Part 7, Parasite-Subject Catalogue: Hosts  

E-Print Network [OSTI]

.] Accipiter nisus "sparrow- hawk" (intestinal tract) Porrocaecum depressum Accipiter nisus Neocolpocephalum (N.) germanum nov. spec. Keymer, I. F., 1972 a Sorjonen, J.. 1971 a all from Finland Niak, A.; and Anwar, ?., 1972 a Iran Keymer, I. F., 1972..." (intestine) Centrorhynchus amphibius Centrorhynchus spp. Sorjonen, J., 1971 a Finland Schmidt, G. D.; and Kuntz, R. ?. , 1969 ? Taiwan Schmidt, G. D.; and Kuntz, R. E., 1971 a Wu-lai, Tai-pei Hsien, Taiwan Wu-lai, Nan-tao Hsien, Taiwan Schmidt...

Shaw, Judith H.; Edwards, Shirley J.; Rayburn, Jane D.; Tolson, Deborah A.; Hood, Martha W.

1976-01-01T23:59:59.000Z

97

Supplement 19, Part 2, Parasite-Subject Catalogue: Parasites: Protozoa  

E-Print Network [OSTI]

mentally retarded Amoebiasis, Human de Armas, J. ?., 19?? a Evins, M. ?., 1968 a California state hospitals G?mez Malaret, S.; et al., children, clinical review I960 a Caracas, Venezuela Amoebiasis, Human Padr?n Puyou, F.j and Gari- children... Paromomicina Amoebiasis, Human, Treat- Bravo R., C.; and Franco R., ment T., 1965 b emetine, electrocardiographic studies Amoebiasis, Human, Treat- de Carvalho, H. T.; Ferreira, ment L. F,j and Camillo-Coura, L., MA-307; AI-307; AI-306; 1963 b CHQ...

Edwards, Shirley J.; Crawley, Lila R.; Shaw, Judith H.; Hood, Martha W.

1975-01-01T23:59:59.000Z

98

Supplement 17, Part 2, Parasite-Subject Catalogue: Parasites: Protozoa  

E-Print Network [OSTI]

Tselinnyi krai Amoebiasis, Human digestive deficit Bellelli, L.j and de Paola, G., 1956 a Bonebakker, ?., [1965 b] Holland Amoebiasis, Human imported disease Amoebiasis, Human, Carriers Lenczner, M.j Spaulding, W. latent carrier state, B...., 1942 a china europeans and annamites Amoebiasis, Human, Portugal Fraga de Azevedo, J., [1965 a] Amoebiasis, Human, Russia Mozgovaia, A. M.j and Kim, A. V., 1965 a Amoebiasis, Human, Immunity Maddison, S. E.; Elsdon-Dew, gel-diffusion R...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1968-01-01T23:59:59.000Z

99

Supplement 15, Parasite-Subject Catalogue, Parasites: Protozoa  

E-Print Network [OSTI]

rostowstschikowi Shul'man, S. S., in Bykhov- nom. nov. New name for C. esocinum Dogiel part, in Rostovsh- chikov, 1952 key Schizothorax intermedius (gall bladder) Chloromyxum truttae skii, ?. ?., 1962 a, 78, 79, 80, fig. I66 Amu-Darya river basin (Var- zob... rostowstschikowi Shul'man, S. S., in Bykhov- nom. nov. New name for C. esocinum Dogiel part, in Rostovsh- chikov, 1952 key Schizothorax intermedius (gall bladder) Chloromyxum truttae skii, ?. ?., 1962 a, 78, 79, 80, fig. I66 Amu-Darya river basin (Var- zob...

Humphrey, Judith M.; Segal, Dorothy B.; Beard, Mary I.; Edwards, Shirley J.; Kirby, Margie D.

1966-01-01T23:59:59.000Z

100

Supplement 16, Part 7, Parasite-Subject Catalogue, Hosts  

E-Print Network [OSTI]

Bogdanova, ?. ?., 19?1 ? Volga River Kosareva, ?. ?., 196l d Volga-Don canal reservoir Ekimova, I. V., 1962 a Petchora River Kolesnikova, ?. ?., I965 a Syr-Darya river Lom, J?, 196I e Czechoslovakia Abramis brama Sphaerostomum bramae (in- testine...?fner, G.; Graubmann, H. D. and Betke, P., 1965 a German lakes Kolesnikova, ?. N., I963 a all from Syr-Darya river Kczicka, J., 1963 a, II8 Lakes of W?gorzewo Establishment, Poland Moln?r, ?. , 1964 b all from Hungary Ekimova, I. V., 1962...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1968-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Supplement 15, Parasite-Subject Catalogue, Parasites: Nematoda And Acanthocephala  

E-Print Network [OSTI]

. Kirgizia I962 a, 142 Ablasov,N.A.;and Chibichenko, N. T., 1962 a, 123 all from Kirgiz Belokobylenko, V. T., 1963 a Kazakhstan Solov'ev, G. V. Kirgizia 1962 a, 142 Ablasov,N.A.;and Chibichenk?, ?. T., 1962 a, 123 Kirgiz Stoican, E.; and Negru, D...., i960 b, 493-4-97 Sadykhov, I. ?., 1962 a, I59 Azerbaidzh?n Tudor, D. C., 1962 a, 493-498 Belokobylenko, V. ?., I963 a Kazakhstan Piivi , M. ; and Vilumets , ?. , I962 a Estonian SSR Jansen, J. (jr.), 1963 a ??zar, 1948 f effect of light...

Humphrey, Judith M.; Segal, Dorothy B.; Beard, Mary I.; Edwards, Shirley J.; Kirby, Mary I.

1966-01-01T23:59:59.000Z

102

Supplement 18, Part 7, Parasite-Subject Catalogue: Hosts  

E-Print Network [OSTI]

, Hungary Parastasiella ovorum Acanthocyclops gigas Fimbriaria fasciolaris Microsomacanthus para- compressa Microsomacanthus paramierosoma Dobrokhotova, 0. V., I965 a all from Southern Kazakhstan Acanthocyclops vernalis Michajlow, W., I965 k, 12... rectangulum 13 western oblasts, Ukraine Dobrokhotova, 0. V., 1965 a all from Southern Kazakhstan Acanthocyclops viridis ? ? ??? ? Dicranotaenia tenuirostris S. M., 1%5 (exper.) Parukhin, A. M.; and PalkLna, Acanthocyclops viridis "Krebstieren...

Edwards, Shirley J.; Kirby, Margie D.; Crawley, Lila R.; Rayburn, Jane D.; Shaw, Judith H.; Walker, Martha L.

1974-01-01T23:59:59.000Z

103

Supplement 16, Parasite-Subject Catalogue: Parasites: Protozoa  

E-Print Network [OSTI]

[Balantidium coli] Appasov, R. N., I963 b Kazakhstan Bell, S., 1963 b Cabanel, G.; Lacroix, R.; and Colonna, P., I96I a Filippovich, A. N. ; and Bel~ clinical aspects,treatment en'kii, I. ?., 1957 a Balantidium coli Yaounde region, Central Cameroons... cristatum L?ger (1906) [Pisces] Chloromyxum dubium Auerbach [Lota lota] Chloromyxum dubium Auerbach [Lota lota] Hyderabad Todd, S. R., 1963 a, 1, 92, 93, 94-96, 97, Pis., figs. 1- 15 Hyderabad Appasov, R. ?., I963 b Kazakhstan Manners, D. J...

Segal, Dorothy B.; Humphrey, Judith M.; Beard, Mary I.; Edwards, Shirley J.; Kirby, Margie D.

1966-01-01T23:59:59.000Z

104

Supplement 18, Part 2, Parasite-Subject Catalogue: Parasites: Protozoa  

E-Print Network [OSTI]

.; transmitted by Boophilus and Kusov, V. N., 1958 a calcaratus; Hyalomma asia- Russia: Kazakhstan and ticum; Rhipicephalus tur- Central Asian Republics anieus +cattle Anaplasma marginale, Vec- Grobov, 0. F., I963 a tors transmitted by Rhipicephalus bursa....; and rus lahorensis; Haemaphy- Rusov, V. ?., 1958 a salis sulcata; Dermacentor Russia: Kazakhstan and marginatus +sheep +goats Anaplasma ovis +mouton Anaplasma ovis anemia, sheep Anaplasma ovis bovine Anaplasma ovis complement fixation Central...

Crawley, Lila R.; Segal, Dorothy B.; Humphrey, Judith M.; Rayburn, Jane D.

1972-01-01T23:59:59.000Z

105

Supplement 15, Parasite-Subject Catalogue, Parasites: Trematoda And Cestoda  

E-Print Network [OSTI]

Koval, V. P., I962 a, 101 " Dnieper delta Moln?r, ?., 1962 a, 125 Lake Balaton Llewellyn, J., I963 a, 298, 3OI, figs. 7 c-d, 8 ? Odening, ?., 1962 e, 388-389, fig. 3 Pietzstall bei Bernau Belokobylenko, V. T., I963 a Kazakhstan Borgarenko, L... Koval, V. P., I962 a, 101 " Dnieper delta Moln?r, ?., 1962 a, 125 Lake Balaton Llewellyn, J., I963 a, 298, 3OI, figs. 7 c-d, 8 ? Odening, ?., 1962 e, 388-389, fig. 3 Pietzstall bei Bernau Belokobylenko, V. T., I963 a Kazakhstan Borgarenko, L...

Humphrey, Judith M.; Segal, Dorothy B.; Beard, Mary I.; Edwards, Shirley J.; Kirby, Margie D.

1966-01-01T23:59:59.000Z

106

Supplement 21, Part 2, Parasite-Subject Catalogue, Parasites: Protozoa  

E-Print Network [OSTI]

, figs, mitosis, atractophorian and microtubule systems, ul- trastructure Amoebophrya grassei Cach?n Cach?n, J.; and Cachon-Enjumet, ?., [1970 b] ultrastructure, relationship to host, life cycle Amoebophrya grassei Cach?n, J.j and Cachon...-Enjumet, ?., 1970 c, figs, mitosis, atractophorian and microtubule systems, ul- trastructure Amoebophrya rosei Cach?n Cach?n, J.; and Cachon-Enjumet, ?., [1970 b] ultrastructure, relationship to host, life ???1? Amoebophrya rosei Cach?n, J.j and Cachon...

Zidar, Judith A; Shaw, Judith H.; Haneman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1978-01-01T23:59:59.000Z

107

Supplement 20, Part 2, Parasite-Subject Catalogue: Parasites: Protozoa  

E-Print Network [OSTI]

.; and Lopes, A. L., 1963 a Brasil Amoebiasis Ambroise-Thomas, P., 1970 ? human, serological diagnosis, immunofluorescence Amoebiasis Archampong, E. Q., 1972 a human liver abscess, peritonitis, surgical treatment Amoebiasis Armengaud, M.; Bourgoin, J... and limitations of hemagglutination test Amoebiasis Kasliwal, R. M.j Kenny, M.; humans, diagnosis, Gupta, M. L.; and Sethi, J. complement fixation test P., l965 a Amoebiasis Kini, P. M.; Venugopal, N. S. humans, treated with Santhamma, ?. M.; and Rao...

Edwards, Shirley J.; Hood, Martha W.

1976-01-01T23:59:59.000Z

108

Recycling asphaltic concrete with sulphur as a supplemental binder  

E-Print Network [OSTI]

RECYCLING ASPHALTIC CONCRETE WITH SULPHUR AS A SUPPLEMENTAL BINDER A Thesis by ROBERT WILLIAM BARNETT Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE... August 1976 Major Subject: Civil Engineering RECYCLING ASPHALTIC CONCRETE WITH SULPHUR AS A SUPPLEMENTAL BINDER A Thesis by ROBERT WILLIAM BARNETT Approved as to style and content by: :) (Chairm o I ommit tee) (M ber) Mem er) August 1976...

Barnett, Robert William

1976-01-01T23:59:59.000Z

109

Growth performance and carcass characteristics of choline supplemented feedlot steers  

E-Print Network [OSTI]

GROWTH PERFORMANCE AND CARCASS CHARACTERISTICS OF CHOLINE SUPPLEMENTED FEEDLOT STEERS A Thesis by WAYNE WALLACE MORGAN Submitted to the Office of Graduate Studies of Texas A & M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE December 1993 Major Subject: Animal Science GROWTH PERFORMANCE AND CARCASS CHARACTERISTICS OF CHOLINE SUPPLEMENTED FEEDLOT STEERS A Thesis by WAYNE WALLACE MORGAN Submitted to Texas ARM University in partial...

Morgan, Wayne Wallace

2012-06-07T23:59:59.000Z

110

Energy Information Administration (EIA) - Supplement Tables - Supplemental  

Gasoline and Diesel Fuel Update (EIA)

6 6 Supplemental Tables to the Annual Energy Outlook 2006 The AEO Supplemental tables were generated for the reference case of the Annual Energy Outlook 2006 (AEO2006) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 2003 to 2030. Most of the tables were not published in the AEO2006, but contain regional and other more detailed projections underlying the AEO2006 projections. The files containing these tables are in spreadsheet format. A total of one hundred and seventeen tables is presented. The data for tables 10 and 20 match those published in AEO2006 Appendix tables A2 and A3, respectively. Forecasts for 2004-2006 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term forecasts and are based on more current information than the AEO.

111

Energy Information Administration (EIA) - Supplement Tables - Supplemental  

Gasoline and Diesel Fuel Update (EIA)

7 7 Supplemental Tables to the Annual Energy Outlook 2007 The AEO Supplemental tables were generated for the reference case of the Annual Energy Outlook 2007 (AEO2007) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 2005 to 2030. Most of the tables were not published in the AEO2007, but contain regional and other more detailed projections underlying the AEO2007 projections. The files containing these tables are in spreadsheet format. A total of one hundred and eighteen tables is presented. The data for tables 10 and 20 match those published in AEO2007 Appendix tables A2 and A3, respectively. Projections for 2006 and 2007 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term projections and are based on more current information than the AEO.

112

Microsoft Word - FEIS-0285-SA-449-Kalsipell-KerrNo1_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-449-Kalispell-Kerr #1 Transmission Line Corridor) Project No. PP&A 2083 Joe Johnson Natural Resource Specialist - TFS/Kalispell Proposed Action: Vegetation Management along the Kalispell-Kerr #1, 115-kV transmission line corridor right-of-way (ROW) Location: The project is located in Flathead and Lake counties, Montana. Proposed by: Bonneville Power Administration (BPA) Description of the Proposal: BPA proposes to remove tall growing and noxious vegetation from the ROW, structure sites, and access roads that can potentially interfere with the operation, maintenance, and reliability of the transmission line. All vegetation management activities will

113

Microsoft Word - FEIS-0285-SA-452-Ross-StJohns-PPA2108_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-452 Ross-St. Johns No. 1) PP&A Project #2108 Ed Tompkins Natural Resource Specialist - TFBV-LMT Proposed Action: Vegetation management and access road maintenance activities along the entire right-of-way (ROW) corridors and associated access roads Location: Clark County, Washington and Multnomah County, Oregon, in the Longview District Proposed by: Bonneville Power Administration (BPA) Description of the Proposal: BPA proposes to clear unwanted vegetation along and adjacent to the transmission line corridor and access roads of the 230-kV Ross-St. Johns No. 1 transmission line corridor from Ross Substation to St. Johns Substation. Other lines that are present within

114

Microsoft Word - FEIS-0285-SA-453-Rivergate-KeelerPPA2109_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-453 Rivergate-Keeler No. 1) PP&A Project #2109 Ed Tompkins Natural Resource Specialist - TFBV-LMT Proposed Action: Vegetation management and access road maintenance activities along the entire Rivergate-Keeler No. 1 230-kV transmission line corridor and associated access roads Location: Multnomah and Washington counties, Oregon, in Bonneville Power Administration's (BPA) Longview District Proposed by: BPA Description of the Proposal: BPA proposes to clear unwanted vegetation along and adjacent to the transmission line corridor, and access roads of the 230-kV Rivergate-Keeler No. 1

115

Microsoft Word - FEIS-0285-SA-455-Bandon-Rogue_DTs PPA 2178_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-455 Bandon-Rogue No. 1) PP&A Project #2178 Stephen Duncan Forester - TERS-3 Proposed Action: Vegetation management activities along the entire right-of-way (ROW) corridors Location: Coos and Curry counties, Oregon, in the Eugene District Proposed by: Bonneville Power Administration (BPA) Description of the Proposal: The project activities would be conducted along the 115-kV Bandon- Rogue No. 1 transmission line corridor from Bandon Substation to Rogue Substation. The 230-kV Fairview-Rogue is also present within the corridor. The ROW corridor in the proposed project area measures from 100 to 400 feet in width and crosses approximately 46 miles of terrain through fee-owned,

116

Microsoft Word - FEIS-0285-SA-450-Flathead-HotSpringsNo1_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-450- Flathead-Hot Springs Transmission Line Corridor) Project No. PP&A 2084 Joe Johnson Natural Resource Specialist - TFS/Kalispell Proposed Action: Vegetation Management along the Flathead-Hot Springs #1 230-kV transmission line corridor right-of-way (ROW) Location: The project is located in Flathead, Lake and Sanders counties, Montana. Proposed by: Bonneville Power Administration (BPA) Description of the Proposal: BPA proposes to remove tall growing and noxious vegetation from the ROW, structure sites and access roads that can potentially interfere with the operation, maintenance, and reliability of the transmission line. All vegetation management activities will

117

Supplement 18, Part 6, Parasite-Subject Catalogue: Subject Headings And Treatment  

E-Print Network [OSTI]

parasites of Dutch soldiers who travelled from West New Guinea through Surinam to the Netherlands Arthritis Reddy, C.R.R.M.; and Sivara- [Dracunculus medinensis], mappa, M., 1968 a human (knee joint) Arthritis Woodard, J. C., I968 a Pneumonyssus...

Walker, Martha L.; Rayburn, Jane D.; Humphrey, Judith M.; Segal, Dorothy B.

1973-01-01T23:59:59.000Z

118

Supplement 17, Part 6, Parasite-Subject Catalogue: Subject Headings And Treatment  

E-Print Network [OSTI]

and future Acarology review, goals Africa African veterinary handbook Wharton, G. W. (.jr.), 19?? a Mackenzie, P. Z.j and Simpson, R. ?., 196? a, 297 pp. Africa Ixodoidea , cattle Yeoman, G. H., 19?? a gar diffusion. See Immunity, Gel diffusion.... Agar gel. See Immunity, Gel diffusion. Age of host Arnastauskiene, ?. V., 196? a swine coccidiosis, Lithuania Age of host Chu, K.Y.; Massoud, J.; and Schistosoma haematobium, Sabbaghian, ?., 1966 a Bulinus truncatus Age of host cattle, egg count...

Humphrey, Judith M.; Segal, Dorothy B.; Walker, Martha L.; Rayburn, Jane D.; Edwards, Shirley J.

1972-01-01T23:59:59.000Z

119

Supplement 16, 6, Parasite-Subject Catalogue, Subject Headings And Treatment  

E-Print Network [OSTI]

Pozo, D., 1962 a Rothman, ?. ?. (jr.); and Fisher, F. M. (jr.), 1964 a Charleston, W. A. G., 1964 a Haemonchus contortus, lambs, blood and bone marrow change Chrz?Lstek-Spruch, H. ; Stroczynska, M.; Szajner- Milart, I.; and Uminski, J., I963 a...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1969-01-01T23:59:59.000Z

120

Enforcement Guidance Supplements (EGS)  

Broader source: Energy.gov (indexed) [DOE]

Supplements (EGS) Supplements (EGS) EGS 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions (09/23/2005) EGS 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria (09/05/2003) EGS 03-01: Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 (07/21/2003) EGS 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation (02/21/2002) EGS 01-02: Management and Independent Assessment (12/17/2001) EGS 01-01: Nuclear Weapons Program Enforcement Issues (10/15/2001) EGS 00-04: Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C (10/26/2000) EGS 00-03: Specific Issues on Applicability of 10 CFR 830 (09/12/2000)

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Draft Supplemental Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

122

Maternal Supplement Use During Pregnancy  

E-Print Network [OSTI]

Background: There is little consensus regarding the need for vitamin and mineral supplementation during pregnancy. The composition and use of supplements among pregnant women varies greatly. Toxicity or inadequacy of nutrients could have health...

Bratton, Mallory Michelle

2012-05-31T23:59:59.000Z

123

Supplement 22, Part 6, Section B. Subject Headings: J-Z, Parasite-Subject Catalogue, Subject Headings and Treatment  

E-Print Network [OSTI]

immune complex causing glomerulonephritis in Plasmodium berghei berghei-infected mice Kidney de Brito, T.; et al., 1975, Am. J. Trop. Med. and Hyg., v. 24 (1), 9-18 light, immunofluorescent and electron micro- scopic study of pathogenetic mechanism... and dyskinetoplastic cells Kinetoplast Hajduk, S. L., 1976, Science (4229), v. 191, 858-859 demonstration of kinetoplast DNA in dyskin- etoplastic strains by fluorescence micros- copy using 4,6-diamidino-2-phenylindole as fluorescent probe Kinetoplast Hill, G. C...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1979-01-01T23:59:59.000Z

124

Supplement 22, Part 6, Section A. Subject Headings: A-I, Parasite-Subject Catalogue, Subject Headings and Treatment  

E-Print Network [OSTI]

., 1977, J. Trop. Med. and Hyg., v. 80 ?8), 169-172 human hepatic amoebic abscesses, use of micro-opaque barium sulfate to assess resolu- tion time of abscesses, favorable comparison with scintiscanning Abscess , Amebic Bray, R. S.; and Harris, W. G... Absorption Borgers, M.; et al., 1975, J. Parasitol., v. 61 (5), 830-843 Taenia taeniaeformis, mice, parenteral treat- ment with mebendazole, progressive micro- morphological changes in cysticerci confined to absorptive compartment of larvae (tegument...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1979-01-01T23:59:59.000Z

125

Supplement 23, Part 6, Section A. Subject Headings: A-I, Parasite-Subject Catalogue, Subject Headings and Treatment  

E-Print Network [OSTI]

, development of systemic amoebiasis with multiple hepatic abscesses 9 months after successful treatment for amebic dysentery with metronidazole, sys- temic infection successfully treated with combination of emetine and chloroquine fol- lowed by an intensive... Dutta, G. P.; and Narain, L., 1978, Indian J. Exper. Biol., v. 16 (7), 838-840 Entamoeba histolytica, influence of pH on amoebicidal activity of 6 systemically active amoebicides against axenically grown para- sites, results indicate that acidic pus...

Hanfman, Deborah T.; Hood, Martha W.; Edwards, Shirley J.; Kirby, Margie D.; Rayburn, Judith H.; Zidar, Judith A.

1982-01-01T23:59:59.000Z

126

EIS-0285-SA-71: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-71: Supplement Analysis 85-SA-71: Supplement Analysis EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285-SA-71, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002)

127

EIS-0285-SA-84: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington (DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02 More Documents & Publications

128

EIS-0285-SA-140: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

40: Supplement Analysis 40: Supplement Analysis EIS-0285-SA-140: Supplement Analysis Transmission System Vegetation Management Program, Salem-Albany Bonneville Power Administration (BPA) proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

129

EIS-0285-SA-122: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0285-SA-122: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

130

EIS-0285-SA-70: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5-SA-70: Supplement Analysis 5-SA-70: Supplement Analysis EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002) More Documents & Publications

131

EIS-0285-SA-12: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-12: Supplement Analysis EIS-0285-SA-12: Supplement Analysis EIS-0285-SA-12: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to clear unwanted vegetation in the rights-ofways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

132

EIS-0285-SA-71: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285-SA-71, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002)

133

Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the  

Broader source: Energy.gov (indexed) [DOE]

Supplement 03-01 Supplemental Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 In October 2000, the Office of Price-Anderson Enforcement (OE) issued Enforcement Guidance Supplement (EGS) 00-04, "Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR subpart C." That EGS, in part, delineated a set of criteria that OE would use to determine whether to apply its enforcement discretion, in this case through the use of Consent Orders. Those criteria provided both guidance to DOE contractors regarding situations for which the use of

134

Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01)  

Broader source: Energy.gov (indexed) [DOE]

December 18, 2003 December 18, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) Ken Kirkman - KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin Project No: 1998-007-03 Location: Union County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW). Description of the Proposed Action: The CTUIR and ODFW propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to

135

EIS-0285-SA-133: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures along the subject transmission line corridors. Approximately 20 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Access roads and tower sites will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line

136

Enforcement Guidance Supplement 00-04, Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS: 00-04 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 October 26, 2000 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-04: Factual Bases for Issuing Consent Orders Pursuant to

137

Glutamine and zinc methionine supplementation to dairy calves  

E-Print Network [OSTI]

into 4 treatment groups with 5 animals each. The calves were fed milk-replacer diets supplemented with 0 or 1% L-glutamine, 1% glycine, or zinc methionine (40 ppm zinc) for a 45-day-period. Next, calves were subjected to intravenous administration...

Simon, Robin Renee

1999-01-01T23:59:59.000Z

138

Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Dixie Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: PLS T1S R8E S1 Dixie Substation in Elmore County, Idaho.

139

LWX-0014 Supplemental Order  

Broader source: Energy.gov (indexed) [DOE]

4 4 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Supplemental Order Name of Petitioner: Ronald A. Sorri Date of Filing: September 26, 1994 Case Number: LWX-0014 This Decision supplements an Initial Agency Decision, dated December 16, 1993, issued by the undersigned Hearing Officer of the Office of Hearings and Appeals (OHA) of the Department of Energy in a case involving a "whistleblower" complaint filed by Ronald A. Sorri (Sorri) under the Department of Energy's Contractor Employee Protection Program, 10 C.F.R. Part 708. See Ronald A. Sorri, 23 DOE & 87,503 (1993) (Sorri). In the December 16 Decision, I found that Sorri had proven by a preponderance of the evidence that he engaged in activities protected under Part 708 and that these activities were a contributing

140

EIS-0220: Supplemental record of decision and supplement analysis  

Broader source: Energy.gov (indexed) [DOE]

20: Supplemental record of decision and supplement analysis 20: Supplemental record of decision and supplement analysis determination EIS-0220: Supplemental record of decision and supplement analysis determination Interim Management of Nuclear Materials at the Savannah River Site DOE has now further decided, because of health and safety vulnerabilities, to stabilize the remaining TRR spent nuclear fuel located in the Receiving Basin for Offsite Fuels (RBOF) at the SRS, using the F-Canyon and FB-Line facilities. The TRR spent nuclear fuel to be stabilized consists of the equivalent of 310 fuel rods (some of the rods were fragmented due to conditions in Taiwan) in 62 aluminum canisters stored underwater in RBOF. DOE has decided to stabilize the TRR spent nuclear fuel because additional TRR spent fuel in at least two of the canisters has failed, and DOE

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Microsoft Word - CX-DrainageUpgradesMultipleSubsFY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

, 2012 , 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: FY13 Environmental Drainage Upgrades at Bonneville Power Administration's (BPA) Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren substations Budget Information: Work Order #: 00004952 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities Location: Substation County, State Township, Range, Section Clatsop Clatsop County, Oregon Township 8 North, Range 9 West, Section 30 Garrison Powell County, Montana Township 9 North, Range 10 West, Section 20 Lexington Cowlitz County, Washington Township 8 North, Range 2 West, Section 15

142

Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

18, 2011 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Hatwai Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to: switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

143

Education research Subject knowledge  

E-Print Network [OSTI]

Education research Subject knowledge and pedagogy in science teacher training October 2011 #12;Subject knowledge and pedagogy in science teacher training John Holman, Senior Fellow for Education subject knowledge (as opposed to general teaching skills), and whether there are significant variations

Rambaut, Andrew

144

Supplementation Strategies for Beef Cattle  

E-Print Network [OSTI]

situations is to stimulate, B-6067 10-97 Supplementation Strategies for Beef Cattle Ted McCollum III* *Professor and Extension Beef Cattle Specialist, The Texas A&M University System. 2 Figure 1. Three possible situations encountered in a supplementation... situations is to stimulate, B-6067 10-97 Supplementation Strategies for Beef Cattle Ted McCollum III* *Professor and Extension Beef Cattle Specialist, The Texas A&M University System. 2 Figure 1. Three possible situations encountered in a supplementation...

McCollum III, Ted

1997-11-03T23:59:59.000Z

145

Enforcement Guidance Supplement - EGS 99-03  

Broader source: Energy.gov (indexed) [DOE]

for Enforcement Department of Energy Washington DC 20585 October 20, 1999 MEMORANDUM FOR: DOE and Contractor PAAA Coordinators FROM: R. Keith Christopher Director Office of Enforcement and Investigation SUBJECT: Enforcement Guidance Supplement 99-03: Limitation of 10 CFR Part 830 to Equipment Referenced in the Safety Analysis Report Recently this Office received a reply to a Preliminary Notice of Violation (PNOV), although not denying any facts or conclusions in the PNOV and agreeing to pay the full imposed Civil Penalty, included arguments that some of the equipment cited in the PNOV was not, in their view, subject to the requirements of Part 830. The contractor argued that only equipment referenced in the Safety Analysis Report (SAR), Technical

146

Enforcement Guidance Supplement 01-22, Management and Independent Assessment  

Broader source: Energy.gov (indexed) [DOE]

EGS: 01-02 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 17, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 01-02: Management and Independent Assessment Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no

147

Bone breakage in laying hens as affected by dietary supplements  

E-Print Network [OSTI]

BONE BREAKAGE IN LAYING HENS AS AFFECTED BY DIETARY SUPPLEMENTS A Thesis by DAVID JOE MOORE Submitted to the Graduate College of Texas Al!M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August 1975... Major Subject: Poultry Science (Physiology) BONE BREAKAGE IN LAYING HENS AS AFFECTED BY DIETARY SUPPLEMENTS A Thesis by DAVID JOE MOORE Approved as to style and content by: Chairman of Comm' ee ad o Department) Member Member '7 I ls&wr g ~, /0...

Moore, David Joe

1975-01-01T23:59:59.000Z

148

ORISE: Human Subjects Protection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Human Subjects Protection Human Subjects Protection The Oak Ridge Institute for Science and Education (ORISE) performs technical assessments to assist U.S. Department of Energy (DOE) laboratories involved in human subjects research projects. Under DOE Order and Policy 443.1A, Protection of Human Subjects, and 10 CFR 745, DOE employees and contractors are expected to protect the rights and welfare of human research subjects. In support of the DOE Office of Science and the Human Subjects Protection Program (HSPP), ORISE has most recently assisted with the development and distribution of tools to address classified research and to track potential human social cultural behavior systems (HSCB) research conducted by DOE laboratories. Examples of products that ORISE has developed in support of the HSPP

149

Supplement Tables - Contact  

Gasoline and Diesel Fuel Update (EIA)

Supplement Tables to the AEO99 Supplement Tables to the AEO99 bullet1.gif (843 bytes) Annual Energy Outlook 1999 bullet1.gif (843 bytes) Assumptions to the AEO99 bullet1.gif (843 bytes) NEMS Conference bullet1.gif (843 bytes) To Forecasting Home Page bullet1.gif (843 bytes) EIA Homepage furtherinfo.gif (5474 bytes) The Annual Energy Outlook 1999 (AEO99) was prepared by the Energy Information Administration (EIA), Office of Integrated Analysis and Forecasting, under the direction of Mary J. Hutzler (mhutzler@eia.doe.gov, 202/586-2222). General questions may be addressed to Arthur T. Andersen (aanderse@eia.doe.gov, 202/586-1441), Director of the International, Economic, and Greenhouse Gas Division; Susan H. Holte (sholte@eia.doe.gov, 202/586-4838), Director of the Demand and Integration Division; James M. Kendell (jkendell@eia.doe.gov, 202/586-9646), Director of the Oil and Gas Division; Scott Sitzer (ssitzer@eia.doe.gov, 202/586-2308), Director of the Coal and Electric Power Division; or Andy S. Kydes (akydes@eia.doe.gov, 202/586-2222), Senior Modeling Analyst. Detailed questions about the forecasts and related model components may be addressed to the following analysts:

150

ORISE: Protecting Human Subjects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

or performed by DOE employees, addresses the protection of human subjects. The Oak Ridge Institute for Science and Education (ORISE) supports DOE in its efforts to protect...

151

Geothermal Technologies Subject Portal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alike at: Introducing The Geothermal Technologies Subject Portal is sponsored by the Geothermal Technologies Program, DOE Energy Efficiency and Renewable Energy (EERE), and is...

152

EIS-0285-SA-141: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-141: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

153

EIS-0285-SA-27: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-27: Supplement Analysis Transmission System Vegetation Management Program, Eugene Region Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and associated access roads that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the

154

EIS-0285-SA-137: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-137: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have lowgrowing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

155

EIS-0285-SA-11: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of- way to control the

156

EIS-0285-SA-28: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-28: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National

157

EIS-0285-SA-43: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-43: Supplement Analysis 85-SA-43: Supplement Analysis EIS-0285-SA-43: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. A follow-up

158

EIS-0285-SA-38: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis Transmission System Vegetation Management Program Bonneville Power Administration (BPA) proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA

159

EIS-0285-SA-15: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

: Supplement Analysis : Supplement Analysis EIS-0285-SA-15: Supplement Analysis Transmission System Vegetation Manaement Program, the ROWs span sections of Vancouver Washington and Portland Oregon and are all located in the Olympia Region BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon

160

EIS-0285-SA-13: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-025-SA-106: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-106: Supplement Analysis -SA-106: Supplement Analysis EIS-025-SA-106: Supplement Analysis Transmission System Vegetation Management Program -106 SnoKing Tap to Monroe-Samamish Line) within Snohomish County, Washington Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments.

162

EIS-0285-SA-118: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-118: Supplement Analysis Transmission System Vegetation Management Program, Holcomb-Naselle 115kV, Pacific County, Washington Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.0 miles of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 30 feet from center of poles and or

163

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

164

EIS-0285-SA-21: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-21: Supplement Analysis EIS-0285-SA-21: Supplement Analysis EIS-0285-SA-21: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Noxon-Hot Springs/Taft-Hot Springs 56/3 to 66/7+600 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of

165

EIS-0285-SA-115: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis 5: Supplement Analysis EIS-0285-SA-115: Supplement Analysis Transmission System Vegetation Management Program, Shelton-Fairmount # 1-4, Jefferson County, Washington Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.5 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 35

166

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-128: Supplement Analysis 85-SA-128: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

167

EIS-0285-SA-108: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-108: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective

168

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis Proposed Silo 3 Alternatives at the FEMP March 1, 1991 EIS-0026-SA-01: Supplement Analysis Transuranic Waste Characterization And Repackaging...

169

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes Department of Energy (DOE) procedures and responsibilities for implementing the policy and requirements set forth in 10 Code of Federal Regulations (CFR) Part 745, Protection of Human Subjects; and in DOE P 443.1A, Protection of Human Subjects, dated 12-20-07. Cancels DOE O 443.1. Canceled by DOE O 443.1B.

2007-12-20T23:59:59.000Z

170

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish DOE procedures and responsibilities for implementing the policy and requirements set forth in 10 CFR Part 745, Protection of Human Subjects, ad in DOE P 443.1, Policy on the Protection of Human Subjects. Cancels DOE O 1300.3. Canceled by DOE O 443.1A.

2000-05-15T23:59:59.000Z

171

Supplemental Gas Supplies  

Gasoline and Diesel Fuel Update (EIA)

. . Supplemental Gas Supplies by State, 1996 (Million Cubic Feet) Table State Synthetic Natural Gas Propane- Air Refinery Gas Biomass Gas Other Total Alabama ...................... 0 18 0 0 0 18 Colorado...................... 0 344 0 0 a 6,443 6,787 Connecticut ................. 0 48 0 0 0 48 Delaware ..................... 0 1 0 0 0 1 Georgia........................ 0 94 0 0 0 94 Hawaii.......................... 2,761 0 0 0 0 2,761 Illinois .......................... 0 488 3,423 0 0 3,912 Indiana......................... 0 539 0 0 b 2,655 3,194 Iowa............................. 0 301 0 0 0 301 Kentucky...................... 0 45 0 0 0 45 Maine........................... 0 61 0 0 0 61 Maryland...................... 0 882 0 0 0 882 Massachusetts ............ 0 426 0 0 0 426 Michigan ...................... 0 0 0 0 c 21,848 21,848 Minnesota.................... 0 709 0 0 0 709 Missouri

172

Supplement Analysis Plutonium Consolidation  

Broader source: Energy.gov (indexed) [DOE]

9-SA-4 9-SA-4 SUPPLEMENT ANALYSIS STORAGE OF SURPLUS PLUTONIUM MATERIALS AT THE SAVANNAH RIVER SITE INTRODUCTION AND PURPOSE In April 2002, DOE decided to immediately consolidate long-term storage at the Savannah River Site (SRS) of surplus, non-pit weapons-usable plutonium then stored at the Rocky Flats Environmental Technology Site (RFETS) (DOE, 2002a). That 2002 decision did not affect an earlier DOE decision made in the January 21, 1997, Record of Decision (ROD, DOE, 1997) for the Storage and Disposition of Weapons-Usable Fissile Materials Programmatic Environmental Impact Statement (Storage and Disposition PEIS, DOE, 1996) to continue storage of non-pit surplus plutonium at Hanford, the Idaho National Laboratory (INL), and the Los Alamos

173

Nov 2007 STEO Supplement  

Gasoline and Diesel Fuel Update (EIA)

07 07 1 November 2007 Short-Term Energy Outlook Supplement: Why Are Oil Prices So High? 1 Crude oil prices have increased dramatically in recent years. West Texas Intermediate (WTI) prices, which remained around $20 per barrel during the 1990's, rose, on average, from about $31 per barrel in 2003 to $57 per barrel in 2005, and to $66 per barrel in 2006. In 2007, WTI crude oil prices have climbed further, to average over $85 per barrel in October, topping $90 per barrel at the end of the month. The EIA believes that the following supply and demand fundamentals are the main drivers behind recent oil price movements: 1) Strong world economic growth driving growth in oil use, 2) Moderate non-Organization of the Petroleum Exporting Countries

174

Shoot growth and physiological disorder of cut rose ‘charming black’ as affected by drought stress during nocturnal supplemental lighting  

Science Journals Connector (OSTI)

Cut rose ‘Charming Black’ was subjected to three treatments to investigate whether a no-irrigation regime causes drought stress during nocturnal supplemental lighting, and to investigate the effect of drought ...

Liyun Shi; Wan Soon Kim

2014-04-01T23:59:59.000Z

175

EIS-0220: Supplemental record of decision and supplement analysis  

Broader source: Energy.gov (indexed) [DOE]

record of decision and supplement analysis record of decision and supplement analysis determination EIS-0220: Supplemental record of decision and supplement analysis determination Interim Management of Nuclear Materials at the Savannah River Site DOE has now further decided, because of health and safety vulnerabilities, to stabilize the remaining TRR spent nuclear fuel located in the Receiving Basin for Offsite Fuels (RBOF) at the SRS, using the F-Canyon and FB-Line facilities. The TRR spent nuclear fuel to be stabilized consists of the equivalent of 310 fuel rods (some of the rods were fragmented due to conditions in Taiwan) in 62 aluminum canisters stored underwater in RBOF. DOE has decided to stabilize the TRR spent nuclear fuel because additional TRR spent fuel in at least two of the canisters has failed, and DOE

176

Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning...  

Broader source: Energy.gov (indexed) [DOE]

for Issuing Consent Orders Pursuant to 10 CFR 820.23 In October 2000, the Office of Price-Anderson Enforcement (OE) issued Enforcement Guidance Supplement (EGS) 00-04, "Factual...

177

II. GENERAL COMPLIANCE SUPPLEMENT INTRODUCTION  

Broader source: Energy.gov (indexed) [DOE]

Rather than repeat these compliance requirements, audit objectives, and suggested audit procedures for each program, they are provided once in this part. For each program in this Compliance Supplement (this Supplement), the program-specific compliance guidance section (Part III of this guidance) contains additional information about the compliance requirements that arise from laws and regulations applicable to each program, including the requirements specific to each program that should be tested using the guidance in this part. Compliance Requirements, Audit Objectives, and Suggested Audit Procedures At the end of this General Compliance Supplement is a matrix that outlines the compliance requirements, including special tests and provisions, that are applicable to programs performed under

178

Document Type: Subject Terms  

E-Print Network [OSTI]

Title: Authors: Source: Document Type: Subject Terms: Abstract: Full Text Word Count: ISSN the department back on track. The action is to call a meeting of the team leaders and stress the urgency o

Major, Arkady

179

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Policy is to establish DOE-specific policy for the protection of human subjects involved in DOE research. Canceled by DOE P 443.1A.

2000-05-15T23:59:59.000Z

180

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Policy is to establish DOE-specific principles for the protection of human subjects involved in DOE research. Cancels DOE P 443.1. Canceled by DOE O 443.1B

2007-12-20T23:59:59.000Z

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

MEMORANDUM FOR: FROM: SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

SUBJECT: SUBJECT: Department of Energy Washington, DC 20585 January 10, 2013 The General Counsel (GC-1) Patricia A. Hoffman ] Assistant Secretary Ofice of Electricity Delivery and Energy Reliability 2013 National Envirorunental Policy Act (NEPA) Annual Planning Summary Attached for your information is the NEP A Annual Planning Summary for FY 2013 for the Ofce of Electricity Delivery and Energy Reliability (OE). The Summary describes the status of

182

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 20, 2003 March 20, 2003 EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program March 19, 2003 EIS-0285-SA-132: Supplement Analysis Transmission System Vegetation Management Program March 12, 2003 EIS-1069-SA-06: Supplement Analysis Yakima/Kilickitat Fisheries Project March 10, 2003 EIS-0225-SA-03: Supplement Analysis Continued Operation of the National Nuclear Security Administration, Pantex Plant and Associated Storage of Nuclear Weapon Components March 10, 2003 EIS-0285-SA-130: Supplement Analysis Transmission System Vegetation Management Program March 7, 2003 EIS-0285-SA-129: Supplement Analysis Transmission System Vegetation Management Program March 6, 2003 EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program

183

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 14, 2001 September 14, 2001 EIS-0265-SA-62: Supplement Analysis Watershed Management Program and the Hood River Fisheries Project September 13, 2001 EIS-0246-SA-17: Supplement Analysis Wildlife Management Program September 11, 2001 EIS-0285-SA-26: Supplement Analysis Transmission System Vegetation Management Program September 5, 2001 EIS-0285-SA-28: Supplement Analysis Transmission System Vegetation Management Program September 5, 2001 EIS-0285-SA-25: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-23: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-22: Supplement Analysis Transmission System Vegetation Management Program, King and Snohomish Counties, WA, in the Snohomish Region

184

Enforcement Guidance Supplement 02-01, Enforcement Position Relative to 10 CFR 835 Bioassy Accreditation  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement EGS: 02-01 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 February 21, 2002 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Section 1.3 of the Operational Procedures for Enforcement, published in June 1998,

185

The effects of dietary phenylalanine supplementation on ochratoxicosis in normal and partially nephrectomized rats  

E-Print Network [OSTI]

THE EFFECTS OF DIETARY PHENYLALANINE SUPPLEMENTATION ON OCHRATOXICOSIS IN NORMAL AND PARTIALLY NEPHRECTOMIZED RATS A Thesis By RUGER WILLIAM PARKER Submitted to the Graduate College of Texas AKM University in partial fulfillment... of the requirements for the degree of MASTER OF SCIENCE December lg83 Magor SubJect: Epidemiology THE EFFECTS OF DIETARY PHENYLALANINE SUPPLEMENTATION ON OCHRATOXICOSIS IN NORMAL AND PARTIALLY NEPHRECTOMIZEU RATS A Thesis by ROGER WILLIAM PARKER Approved...

Parker, Roger William

2012-06-07T23:59:59.000Z

186

FTCP Issue Paper Supplemental Competencies  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Competencies DOCUMENT NUMBER FTCP-12- 003 PROBLEM: There is no approved process for issuing supplemental competencies. BACKGROUND: Supplemental competencies cover important skills and abilities that are less than an entire function or position, and for which an entire Functional Area Qualification Standard (FAQS) is not appropriate. The Human Factors Engineering (HFE) competencies issued by the FTCP in March 2012 are an example. The FTCP established a working group to develop HFE competencies, and the Panel provided them for use. Another example is the Safety System Oversight (SSO) function, which does not have (or require) a dedicated FAQS, but does need some oversight-related supplemental competencies. It is likely that other disciplines or

187

2.1E Supplement  

E-Print Network [OSTI]

Supplement — 2.IE Update AIR SOURCE HEAT PUMP ENHANCEMENTScurve for air source electric and gas heat pumps do not useP E = PSZ HEAT-SOURCE = GAS-HEAT-PUMP A four-pipe G H P air

Winkelmann, F.C.

2010-01-01T23:59:59.000Z

188

Enforcement Guidance Supplement 01-01, Nuclear Weapon Program Enforcement Issues  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement Enforcement Guidance Supplement EGS:01-01 Appendix E-Operational Procedures for Enforcement Department of Energy Washington, DC 20585 October 15, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement

189

Enforcement Guidance Supplement 99-02  

Broader source: Energy.gov (indexed) [DOE]

EGS 99-02 EGS 99-02 Appendix E - Operational Procedures for Enforcement July 16, 1999 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in its enforcement activities. The focus of this enforcement guidance clarifies internal dosimetry program requirements identified by the Department of

190

Enforcement Guidance Supplement 00-03  

Broader source: Energy.gov (indexed) [DOE]

EGS:00-03 EGS:00-03 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 September 12, 2000 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH- Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in enforcement activities. This enforcement guidance focuses on several issues related to applicability of 10 CFR 830 that have been observed in

191

MEMORANDUM TO: FILE SUBJECT:  

Office of Legacy Management (LM)

SUBJECT: SUBJECT: -Li&$diM ---------- -2' ~~EI: ---- --------:------- CITY: %-k&&k/ -------------------------- ST&T& oi+ OWN_EM_SL Past : ---------------------A-- Current:___--~---____------_______ Owner contacted q yes anno; if yes, date contacted ------------- TYPE OF OPERATION ~_------_~~-----_ tJ Research & Development 0 Production scale tssting Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis 0 Production 0 Disposal/Storage @ ' Facility Type 0 Manufacturing a University 0 Research Organization -------- 0 Prime' 0 Subcontractor 0 Purchase Order q Other information (i.e., cost + fixed fee, unit price, time 81 material, etc) ------- ~_-----_------~-------~~~~~~ Contract/Purchase Order # ----------------------------

192

MEMORANDUM SUBJECT8  

Office of Legacy Management (LM)

SUBJECT8 SUBJECT8 CILTERNATE . N*MEt_--_-____-_____------- ---------STATE:- -- nm -------- pestr Current: ------------------------ -------------------------- Owner contacted 0 yes 0 no; if yes, datr contacted me---mm------ TYPE OF OPERATION ----------------- P esearch & Development cl Facility Type 0 Production scale testing 2s c] tlanufacturinq Pilot Scale 0 University w Bench Scale Process 0 Research Organization 0 Theoretical Studies 0 Government Sponsored Facility 0 Sample 81 Analysis a Other . --------------------- D Production Cl Disposal /Storage TYPE OF CONTRCSCT -------w---e---- 0 Subcontractor ' 0 Purchase Order 0 Other information (i.e., cost + fixed fee, unit price, time 81 material, l tc) ------- ---------------------we-em ---------------------------

193

EIS-0265-SA-100: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0265-SA-100: Supplement Analysis Oregon Fish Screening Project, Screen Replacements Supplement Analysis for the Watershed Management Program...

194

EIS-0312-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-03: Supplement Analysis EIS-0312-SA-03: Supplement Analysis Fish and Wildlife Implementation Plan The attached Supplement Analysis for Bonneville Power Administration's (BPA's)...

195

EIS-0312-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis EIS-0312-SA-01: Supplement Analysis Fish and Wildlife Implementation Plan Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE...

196

EIS-0285-SA-142: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0285-SA-142: Supplement Analysis Transmission System Vegetation Management Program Supplement Analysis for the Transmission System Vegetation Management...

197

EIS-0290-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project DOEEIS-0290-SA-02: Supplement Analysis Naval Reactors...

198

EIS-0026-SA-09: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-09: Supplement Analysis EIS-0026-SA-09: Supplement Analysis Supplement Analysis for a Proposal to Temporarily Store Defense Transuranic Waste Prior to Disposal at the Waste...

199

EIS-0026-SA-05: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

-SA-05: Supplement Analysis EIS-0026-SA-05: Supplement Analysis Waste Isolation Pilot Plant Site Wide Operations, Carlsbad, New Mexico This supplement analysis examines changes to...

200

EIS-0265-SA-90: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0265-SA-90: Supplement Analysis Watershed Management Program Naches River Water Treatment Plant Intake Screening Project (September 2002) Supplement...

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact...  

Office of Environmental Management (EM)

Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the...

202

Supplemental Analysis for the Final Environmental Impact Statement...  

Office of Environmental Management (EM)

Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final...

203

SNL/CA Supplement Analysis  

Broader source: Energy.gov (indexed) [DOE]

22-SA-01 22-SA-01 Supplement Analysis for the Final Site-Wide Environmental Assessment for Sandia National Laboratories/California [September 2012] U.S. Department of Energy National Nuclear Security Administration Sandia Site Office This page intentionally left blank COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY/NATIONAL NUCLEAR SECURITY ADMINISTRATION TITLE: Supplement Analysis for the Final Site-Wide Environmental Assessment for Sandia National Laboratories/California (DOE/EA-1422-SA-01) CONTACT: For further information concerning this Supplement Analysis, contact Ms. Susan Lacy Environmental Team Leader Sandia Site Office National Nuclear Security Administration P. O. Box 5400, MS 0184 Albuquerque, New Mexico 87185-5400 Phone: (505) 845-5542

204

Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Foreword COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada

205

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 10, 2004 August 10, 2004 EIS-0265-SA-169: Supplement Analysis Watershed Management Program August 10, 2004 EIS-0265-SA-168: Supplement Analysis Watershed Management Program August 9, 2004 EIS-0265-SA-167: Supplement Analysis Watershed Management Program August 6, 2004 EIS-0265-SA-166: Supplement Analysis Watershed Management Program August 4, 2004 EIS-0310-SA-01: Supplement Analysis Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States August 4, 2004 EIS-0265-SA-165: Supplement Analysis Watershed Management Program - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence August 4, 2004 EIS-0265-SA-163: Supplement Analysis Watershed Management Program August 2, 2004 EIS-0265-SA-164: Supplement Analysis

206

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 2, 2003 October 2, 2003 EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis August 27, 2003 EIS-0246-SA-35: Supplement Analysis Wildlife Mitigation Program, seven miles east of Juntura, Oregon, Malheur County August 22, 2003 EIS-0246-SA-34: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana July 14, 2003 EIS-1069-SA-07: Supplement Analysis Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek Acclimation Site, Kittitas County, Washington May 21, 2003 EIS-0246-SA-33: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana May 20, 2003 EIS-0246-SA-32: Supplement Analysis Wildlife Mitigation Program

207

Depleted uranium disposition study -- Supplement, Revision 1  

SciTech Connect (OSTI)

The Department of Energy Office of Weapons and Materials Planning has requested a supplemental study to update the recent Depleted Uranium Disposition report. This supplemental study addresses new disposition alternatives and changes in status.

Becker, G.W.

1993-11-01T23:59:59.000Z

208

California Energy Commission SUPPLEMENTAL STAFF REPORT  

E-Print Network [OSTI]

California Energy Commission SUPPLEMENTAL STAFF REPORT SUPPLEMENTAL INITIAL STUDY AND NONRESIDENTIAL BUILDINGS CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor MAY 2012 CEC4002012002SP #12;CALIFORNIA ENERGY COMMISSION Joe Loyer Primary Author Maziar Shirakh, P.E. Project Manager

209

Recommendations for the Supplement Analysis Process  

Broader source: Energy.gov [DOE]

DOE has prepared this guidance regarding Supplement Analyses.The guidance discusses decisions regarding whether to prepare a Supplement Analysis (SA), the substantive content of the analysis, procedural aspects of preparing an SA, and the outcomes that can result.

210

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » NEPA Documents » Supplement Analyses (SA) Services » NEPA Documents » Supplement Analyses (SA) Supplement Analyses (SA) A document that DOE prepares in accordance with DOE NEPA regulations (10 CFR 1021.314(c)) to determine whether a supplemental or new EIS should be prepared pursuant to CEQ NEPA regulations (40 CFR 1502.9(c). If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. Documents Available for Download October 10, 2013 EA-1812: Final Supplement Analysis Haxtun Wind Energy Project, Logan and Phillips Counties, CO September 10, 2013 EIS-0310-SA-02: Supplement Analysis Nuclear Infrastructure Programmatic Environmental Impact Statement Supplement Analysis Determination for Plutonium-238 Production for Radioisotope Power Systems June 14, 2013 EA-1562-SA-1: Supplement Analysis

211

EIS-0350-SA-02: Final Supplement Analysis  

Broader source: Energy.gov [DOE]

Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico Supplement Analysis

212

Supplement to Loan Guarantee Solicitation Announcement | Department...  

Broader source: Energy.gov (indexed) [DOE]

for projects that employ innovative energy efficiency, renewable energy, and advanced transmission and distribution technologies Supplement to Loan Guarantee Solicitation...

213

EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...  

Energy Savers [EERE]

Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National...

214

MEHORANDUfl TO: FILE SUBJECT:  

Office of Legacy Management (LM)

MEHORANDUfl MEHORANDUfl TO: FILE ------_____ SUBJECT: OWNER (S) -----_-- Post:-------_-------_________ current: ---------_---------_______ Owner contacted 0 yes Qnna; if yes, date contacted -------_--___ TYPE OF OPERATION ~~~---~~_-----__- 0 Research & Develapment x Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Pkoces;s i ,Theoretical Studies Sample & Analysis 0 Manufacturing 0 University 0 Research Drganizaticn 0 Government Sponsored Facility & other &ded-S~AWe-- c Production 0 Di cposal /Storage TYPE OF CONTRACT ---------------- 5 Prime 0 Q Subcontract& -$JJ$~~~$~~' ~~*' - T04' L Other information (i.e., cost + fixed fee, unit price, 0 Purchase Order time 81 material, qtr) ------- _----__------_---__--------- Cantract/Purkhaae Order #-@ -'

215

Recommendations for the Supplement Analysis Process  

Broader source: Energy.gov (indexed) [DOE]

Recommendations Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance printed on recycled paper Recommendations for the Supplement Analysis Process Contents

216

Item Subject FAR Case  

Broader source: Energy.gov (indexed) [DOE]

Federal Acquisition Circular (FAC) 2005-53 Item Subject FAR Case I. Equal Opportunity for Veterans 2009-007 II. Unique Procurement Instrument Identifier 2009-023 III. Uniform Suspension and Debarment Requirement 2009-036 IV. Extension of Sunset Date for Protests of Task and 2011-015 Delivery Orders V. Encouraging Contractor Policies to Ban Text Messaging 2009-028 While Driving. VI. TINA Interest Calculations 2009-034 Item I--Equal Opportunity for Veterans (FAR 2009-007) The interim rule, published September 29, 2010, is adopted as final with minor changes. A definition from the clause at FAR 52.222-35 for ``executive and senior management'' is added to FAR subpart 22.13. The interim rule implemented Department of

217

To: From: Subject:  

Gasoline and Diesel Fuel Update (EIA)

To: To: From: Subject: Department of Energy Washington, DC 20585 May 8, 2013 Rebecca Peterson U.S . Energy Information Administration Patricia A. Hoffman @tJ- Assistant Secretary Office of Electricity Delivery and Energy Reliability Office of Electricity Delivery and Energy Reliability (OE) Comments on proposal to create EIA-930 Thank you for the opportunity to provide comments on the proposed U.S . Energy Information Administration (EIA) forms to go into effect in 2014. In particular we would like to offer comments on the newly proposed EIA-930, Balancing Authority Operations Report. We strongly support EIA's proposal to collect hourly information on actual transmission system utilization. We further encourage EIA to make the majority of these data publicly available, possibly on a different schedule than is proposed in

218

DATE: TO: FROM: SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

219

SUBJECT: OWNER(S)  

Office of Legacy Management (LM)

HEHORANDUH HEHORANDUH ;;&; DC&b ------w--v SUBJECT: OWNER(S) -------- P1st a Owner contrctmd TYPE OF OPERATION ----------------- 0 Research I Development 0 Facility Type 0 Production scale testing 0 Pilot Scrlr 0 Bench Seal0 Procemm 0 Theoretical Studier 0 Sample & Anrlyri l 0 Production x Dimpomrl/Storrgr 0 Hmufrcturing 0 University 0 Rmsmarch Organization 0 Government Sponmored Facility 0 Other -II---------------- TYPE OF CONTRACT ----u---------- 0 d ime Subcontract& 0 Purchrre Order 0 Other information (i.e., comt -w-e--- Contrrct/Purchrsa Order 0 CONTRACTING PERIOD: ------------------ . OWNERSHIPa AEC/HED OWNED m---w LANDS 0 BUILDINSS 0 EQUIPMENT 0 ORE OR RAW HA-I-L 0 FINAL PRODUCT q WASTE & RESIDUE 0 AEC/HED LEASED ---w-w E 0 0

220

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 21, 2002 June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program June 20, 2002 EIS-0170-SA-01: Supplement Analysis System Operation Review EIS, Bonneville Power Administration, and B.C. Hydro and Power Authority, British Columbia, Canada June 19, 2002 EIS-0265-SA-83: Supplement Analysis Watershed Management Program June 11, 2002 EIS-0246-SA-25: Supplement Analysis Wildlife Mitigation Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis Transmission System Vegetation Management Program May 24, 2002 EIS-0183-SA-04: Supplement Analysis Klondike Wind Project - Power Purchase Agreement, Contract Number 02PB-11093 Near Wasco, Sherman County, Oregon May 23, 2002 EIS-0246-SA-24: Supplement Analysis Wildlife Mitigation Program May 21, 2002

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 15, 2011 August 15, 2011 EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project August 4, 2011 EIS-0348-SA-03: Supplement Analysis Continued Operation of Lawrence Livermore National Laboratory August 4, 2011 EIS-0348-SA-03: Supplement Analysis Continued Operation of Lawrence Livermore National Laboratory, CA July 12, 2011 EIS-0407-SA-01: Supplement Analysis Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas July 11, 2011 EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico July 8, 2011 EIS-0240-SA-01: Supplement Analysis Disposition of Surplus Highly Enriched Uranium July 7, 2011 EIS-0200-SA-03: Supplement Analysis

222

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 30, 2001 March 30, 2001 EIS-0285-SA-05: Supplement Analysis Transmission System Vegetation Management Program March 27, 2001 EIS-0285-SA-04: Supplement Analysis Transmission System Vegetation Management Program March 9, 2001 EIS-0285-SA-02: Supplement Analysis Transmission System Vegetation Management Program March 1, 2001 EIS-0189: Supplement Analysis Tank Waste Remediation System December 1, 2000 EIS-0200-SA-01: Supplement Analysis Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) November 1, 2000 EIS-0169-SA-04: Supplement Analysis Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities September 20, 2000 EIS-0238-SA-01: Supplement Analysis Continued Operations of Los Alamos National Laboratory

223

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 February 27, 2002 EIS-0285-SA-46: Supplement Analysis Transmission System Vegetation Management Program February 27, 2002 EIS-0285-SA-45: Supplement Analysis Transmission System Vegetation Management Program February 27, 2002 EIS-0285-SA-43: Supplement Analysis Transmission System Vegetation Management Program February 20, 2002 EIS-0265-SA-75: Supplement Analysis Watershed Management Program - Gourlay Creek Fish Ladder Project February 19, 2002 EIS-0285-SA-40: Supplement Analysis Transmission System Vegetation Management Program February 15, 2002 EIS-0285-SA-42: Supplement Analysis Transmission System Vegetation Management Program February 5, 2002 EIS-0229-SA-02: Supplement Analysis Storage of Surplus Plutonium Materials in the K-Area Material Storage Facility at The Savannah River Site

224

THE INTERPLANETARY NETWORK SUPPLEMENT TO THE BATSE CATALOGS OF UNTRIGGERED COSMIC GAMMA-RAY BURSTS  

E-Print Network [OSTI]

THE INTERPLANETARY NETWORK SUPPLEMENT TO THE BATSE CATALOGS OF UNTRIGGERED COSMIC GAMMA-RAY BURSTS gamma-ray bursts (GRBs) observed as untriggered events by the Burst and Transient Source Experiment to detect BATSE un- triggered bursts. Subject headinggs: catalogs -- gamma rays: bursts Online material

California at Berkeley, University of

225

Federal Buildings Supplemental Survey -- Overview  

U.S. Energy Information Administration (EIA) Indexed Site

Survey > Overview Survey > Overview Overview Percent of FBSS Buildings and Floorspace by Selected Agencies, FY 1993 Percent of FBSS Buildings and Floorspace by Selected Agencies, FY 1993 Sources: Energy Information Administration, Energy Markets and End Use, 1993 Federal Buildings Supplemental Survey. Divider Line Highlights on Federal Buildings The Federal Buildings Supplemental Survey 1993 provides building-level energy-related characteristics for a special sample of commercial buildings owned by the Government. Extensive analysis of the data was not conducted because this report represents the 881 responding buildings (buildings for which interviews were completed) and cannot be used to generalize about Federal buildings in each region. Crosstabulations of the data from the 881 buildings are provided in the Detailed Tables section.

226

CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

r r r r r t r r t r r r * r r r r r r CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA ,FACILITY RECORDS 1970 UNITED STATES ATOMIC ENERGY COMMlSSION NEVADA OPERATIONS OFFICE LAS VEGAS, NEVADA September 1970 Prepared By Holmes & Narver. Inc. On-Continent Test Division P.O. Box 14340 Las Vegas, Nevada 338592 ...._- _._--_ .. -- - - - - - - .. .. - .. - - .. - - - CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA FACILITY RECORDS 1970 This page intentionally left blank - - .. - - - PURPOSE This facility study has been prepared in response to a request of the AEC/NVOO Property Management Division and confirmed by letter, W. D. Smith to L. E. Rickey, dated April 14, 1970, STS Program Administrative Matters. The purpose is to identify each facility, including a brief description, the acquisition cost either purchase and/or construction, and the AE costs if identi- fiable. A narrative review of the history of the subcontracts

227

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 2, 2002 December 2, 2002 EIS-0285-SA-113: Supplement Analysis Transmission System Vegetation Management Program November 25, 2002 EIS-0265-SA-100: Supplement Analysis Oregon Fish Screening Project, Screen Replacements November 22, 2002 EIS-0265-SA-99: Supplement Analysis Watershed Management Program November 18, 2002 EA-1282-SA-03: Supplement Analysis Mid-Columbia Coho Reintroduction Feasibility Project November 1, 2002 EIS-0203-SA-01: Supplement Analysis INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management October 31, 2002 EIS-0026-SA-03: Supplement Analysis Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant October 28, 2002

228

EA-1212-SA-01: Final Supplement Analysis  

Broader source: Energy.gov [DOE]

Final Supplement Analysis for the Environmental Assessment for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory

229

EIS-1069-SA-07: Supplement Analysis  

Broader source: Energy.gov [DOE]

Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek Acclimation Site, Kittitas County, Washington

230

Federal Buildings Supplemental Survey - Index Page  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

3 Federal Buildings 1993 Federal Buildings Supplemental Survey Overview Full Report Tables Energy usage and energy costs, by building characteristics, for federally-owned buildings...

231

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Compression and Flyer Plate Experiments Involving Plutonium at the Z and Saturn Accelerators September 2, 2002 EIS-0169-SA-05: Supplement Analysis YakimaKlickitat Fisheries...

232

EIS-0451: Supplemental Draft Environmental Impact Statement ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho Bonneville Power Administration (BPA) BPA prepared a supplemental draft EIS to evaluate an additional...

233

Total Supplemental Supply of Natural Gas  

Gasoline and Diesel Fuel Update (EIA)

Product: Total Supplemental Supply Synthetic Propane-Air Refinery Gas Biomass Other Period: Monthly Annual Download Series History Download Series History Definitions, Sources &...

234

Supplemental Comments of the Plumbing Manufacturers Instititute...  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Comments of the Plumbing Manufacturers Instititute Regarding the Economic Impacts of the Proposed Definition of "Showerhead," Docket No. EERE-2010-BT-NOA-0016...

235

,"New York Supplemental Supplies of Natural Gas"  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Supplemental Supplies of Natural Gas",5,"Annual",2013,"6301967" ,"Release Date:","10...

236

VIRGINIA BUSINESS Advertising SupplementVIRGINIA BUSINESSVIRGINIA BUSINESS Advertising Supplement INNINNOOVATIVATIVATIVATIVATIVATIVATIVATIVATIVATIVATIVATIOwww.vt.edu  

E-Print Network [OSTI]

VIRGINIA BUSINESS Advertising SupplementVIRGINIA BUSINESSVIRGINIA BUSINESS Advertising Supplement.vt.edu Owww.vt.edu OOwww.vt.edu Owww.vt.edu ONN #12;VIRGINIA BUSINESS Advertising Supplement IDEASATWORK VT2-added byproducts and,in the process,reducing pollutants flowing into the Chesapeake Bay; and improving automated

Buehrer, R. Michael

237

SUPPLEMENT:  

Science Journals Connector (OSTI)

......levels of school education. This would build...to lever more science into the curriculum. Posters for sale. Sets of six colour posters have been bought...Schools and College Education Department at...astronomy, space science and geophysics......

Report of Council: To the 179th Annual General Meeting of the Society

1999-10-01T23:59:59.000Z

238

Supplement  

Science Journals Connector (OSTI)

...there is a deadline of July 1, 1975, for submis- sion...presently contains more than 500 mineral species and is...13 p., 13 figs., 1 tbl.) The texture, thickness...least 16,000 km2 and 7,500 km2, respectively. Their...between 40,000 yr and 1.84 m.y. ago. Were...

239

ORISE: Protecting Human Subjects Website  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

provide protection with respect to the rights and welfare of research subjects. The Oak Ridge Institute for Science and Education (ORISE) administers the Oak Ridge Sitewide...

240

Supplement to The Imnaha Subbasin Plan Introduction  

E-Print Network [OSTI]

2004 draft Imnaha Subbasin Assessment and Imnaha Subbasin Management Plan (available at www in these documents. This supplement was reviewed by the Imnaha Technical and Planning Teams during the fall of 2004. This supplement is presented in four sections that correspond to information requested by the Northwest Power

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Stakeholder Engagement and Outreach: Renewable Energy Supplemental  

Wind Powering America (EERE)

Renewable Energy Supplemental Environmental Projects Renewable Energy Supplemental Environmental Projects Supplemental Environmental Projects are a policy vehicle that can provide funding for renewable energy projects. Renewable energy projects can stimulate the economy, help ensure energy security, and improve the quality of the air and water. The U.S. Environmental Protection Agency designed Supplemental Environmental Projects to give companies that violate environmental regulations an alternative to standard fines. When a company violates environmental regulations, it has the option to pay a fine to the state or federal government or volunteer to fund environmentally friendly projects. These projects can provide a positive outcome for the company and the community. For more information on supplemental environmental projects,

242

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 5, 2008 February 5, 2008 EIS-0378-SA-01: Supplement Analysis Port Angeles-Juan de Fuca Transmssion Project September 5, 2007 EIS-0229: Supplement Analysis (September 2007) Storage of Surplus Plutonium Materials at the Savannah River Site September 3, 2007 EIS-0026-SA-06: Supplement Analysis Transportation of Transuranic Waste in TRUPACT-III Containers, Carlsbad Field Office March 29, 2007 EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) March 29, 2007 EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride

243

EIS-0312-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0312-SA-02: Supplement Analysis Fish and Wildlife Implementation Plan Columbia Basin Riparian Conservation Easement Program. The action area for the...

244

EA-1611-S1: Draft Supplemental Environmental Assessment | Department...  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a draft supplemental EA that...

245

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment...  

Office of Environmental Management (EM)

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program Reviews Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program...

246

EIS-0285-SA-134: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis EIS-0285-SA-134: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Bandon-Rogue-Gold Beach transmission...

247

EIS-0285-SA-104: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis EIS-0285-SA-104: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1...

248

EIS-0285-SA-101: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis EIS-0285-SA-101: Supplement Analysis Transmission System Vegetation Management Program, Spokane Region Vegetation Management for Substations and Non-Electric...

249

EIS-0285-SA-126: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Supplement Analysis EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Alvey Fairview 230kV transmission line...

250

EIS-0285-SA-121: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Murry-Custer No.1 transmission line...

251

EIS-0285-SA-113: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis EIS-0285-SA-113: Supplement Analysis Transmission System Vegetation Management Program To perform remedial vegetation management for keeping vegetation a...

252

EIS-0285-SA-139: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis EIS-0285-SA-139: Supplement Analysis Transmission System Vegetation Management Program - Little Goose-Lower Granite Corridor Maintenance Vegetation...

253

EIS-0285-SA-112: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0285-SA-112: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for portions of the Ross-Alcoa transmission...

254

EIS-0285-SA-105: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis EIS-0285-SA-105: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and...

255

DOE response to questions from AHAM on the supplemental proposed...  

Energy Savers [EERE]

response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers DOE response to questions from AHAM on the supplemental proposed test...

256

EIS-0285-SA-100: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0285-SA-100: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Libby-Conkelly, 12 to 264...

257

EIS-0285-SA-150: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0285-SA-150: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the East Ellensburg Tap, 16 to 319...

258

EIS-0285-SA-37: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

37: Supplement Analysis EIS-0285-SA-37: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Monroe-Custer No.1 Transmission Line...

259

EIS-0285-SA-34: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

34: Supplement Analysis EIS-0285-SA-34: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the McNary-Ross Transmission Line ROW...

260

EIS-0423-S1: Supplemental Environmental Impact Statement for...  

Broader source: Energy.gov (indexed) [DOE]

23-S1: Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury EIS-0423-S1: Supplemental Environmental Impact Statement for the...

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EIS-0005-FS: Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

262

EIS-0026-S2: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

S2: Final Supplemental Environmental Impact Statement EIS-0026-S2: Final Supplemental Environmental Impact Statement Carlsbad Area Office, Waste Isolation Pilot Plant Disposal...

263

EIS-0026-SA-07: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis EIS-0026-SA-07: Supplement Analysis Waste Isolation Pilot Plant Site-Wide Operations, Carlsbad Field Office The Proposed Action is to continue the...

264

Hydrogen as a Supplemental Fuel in Diesel Engines | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

as a Supplemental Fuel in Diesel Engines Hydrogen as a Supplemental Fuel in Diesel Engines Poster presentation from the 2007 Diesel Engine-Efficiency & Emissions Research...

265

EIS-0350-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-01: Supplement Analysis EIS-0350-SA-01: Supplement Analysis Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos...

266

EIS-0030-S: Final Supplemental Environmental Impact Statement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

30-S: Final Supplemental Environmental Impact Statement EIS-0030-S: Final Supplemental Environmental Impact Statement Bonneville Power Administration Proposed FY 1980 Program,...

267

EIS-0082-S: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

S: Final Supplemental Environmental Impact Statement EIS-0082-S: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to...

268

EIS-0380: Notice of Intent to Prepare a Supplemental Environmental...  

Energy Savers [EERE]

380: Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0380: Notice of Intent to Prepare a Supplemental Environmental Impact Statement Continued...

269

EIS-0288-S1: Draft Supplemental Environmental Impact Statement...  

Energy Savers [EERE]

Draft Supplemental Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Draft...

270

Supplement 18, Part 5, Parasite-Subject Catalogue: Parasites: Arthropoda And Miscellaneous Phyla  

E-Print Network [OSTI]

.: Rosalialges Lavoipierre, 19 64. Alouattalges corbeti Fain, ?., 1966 e, ??, figs. Fain, 1963 12-15 Syn.: Rosalialges cru- Paramaribo, Surinam ciformis Lavoipierre, 1964: syn. nov. Alouatta senicidus macconnelli Alveonasus canestrinii Filippova...

Segal, Dorothy B.; Humphrey, Judith M.; Rayburn, Jane D.; Podani, Jule M.; Edwards, Shirley J.; Kirby, Margie D.

1972-01-01T23:59:59.000Z

271

Supplement 22, Part 4, Parasite-Subject Catalogue, Parasites: Nematoda and Acanthocephala  

E-Print Network [OSTI]

, D. W., 1976, Trop, and Geogr. Med., v. 28 (2), 104-110 Ancylostoma spp., prevalence and geographical distribution survey of hookworm in dogs and cats, follow-up of 1967 survey cat dog all from Surinam Ancylostoma braziliense Robinson, M...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1980-01-01T23:59:59.000Z

272

Supplement 22, Part 5, Parasite-Subject Catalogue, Parasites: Arthropoda And Miscellaneous Phyla  

E-Print Network [OSTI]

-67 Rattus sabanus vociferans: Gunong Benom, Pahang, Malaysia Afrolistrophorus maculatus ssp. rattus ssp. n. Fain, ?., 1976, Acta Zool. et Path. Antverpi- ensia (64) , 37-67 Rattus rattus: Lelydorp, Surinam Rattus rattus frugivorus: Brokubaka, Surinam...

Edwards, Shirley J.; Hood, Martha W.; Shaw, Judith H.; Rayburn, Jane D.; Kirby, Margie D.; Hanfman, Deborah T.; Zidar, Judith A.

1981-01-01T23:59:59.000Z

273

Supplement 22, Part 5, Parasite-Subject Catalogue, Parasites: Arthropoda and Miscellaneous Phyla  

E-Print Network [OSTI]

(64) , 37-67 Rattus rattus: Lelydorp, Surinam Rattus rattus frugivorus: Brokubaka, Surinam Afrolistrophorus mediolineatus sp. n. Fain, ?., 1976, Acta Zool. et Path. Antverpi- ensia (64), 37-67 bandicoot rat: Ban Thenon, 18 Km NW Kieng- Kwang...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1981-01-01T23:59:59.000Z

274

Supplement 22, Part 3, Parasite-Subject Catalogue, Parasites: Trematoda and Cestoda  

E-Print Network [OSTI]

-1029 as syn. of Acanthostomum loossi (Perez Vigueras) Groschaft ? Barus, 1970 Acanthocolpus sp. Anantaraman, S., 1963, J. Marine Biol. Ass. India, v. 5 (1), 137-139 Chirocentrus dorab: Madras Coast Acanthocolpus caballeroi sp. nov., illus. Gupta, A. N...-3), 226 Cybium guttatum (pyloric part of the stom- ach) : off the Verawal coast, Jodhpur, India Acanthocolpus luhei Anantaraman, S., 1963, J. Marine Biol. Ass. India, v. 5 (1), 137-139 Chirocentrus dorab: Madras Coast Acanthocotyle lobianchi Kearn...

Edwards, Shirley J.; Hood, Martha W.; Shaw, Judith H.; Rayburn, Jane D.; Kirby, Margie D.; Hanfman, Deborah T.; Zidar, Judith A.

1981-01-01T23:59:59.000Z

275

Supplement 23, Part 4, Parasite-Subject Catalogue, Parasites: Nematoda and Acanthocephala  

E-Print Network [OSTI]

., G., 1966, Bull. Mus. National Hist. Nat., 2. s., v. 38 (5), 683-686 Mabuia comorensis (estomac): Mozambique, Afrique Abbreviata occidentalis, sp. nov., illus. Jones, ?. I., 1978, Austral. J. Zool., v. 26 (4), 789-807 key Pseudechis australis... Slovenia, Yugoslavia Acuaria skrjabini Ozerska, 1926 Mason, P. C.; Hodgkinson, N. L.; and McAllum, H. J. F., 1978, N. Zealand Vet. J., v. 26 (5), 131-132 mebendazole Uraeginthus bengalus (gizzard, beneath horny lining of gizzard, intestine): aviary...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1982-01-01T23:59:59.000Z

276

Supplement 23, Part 3, Parasite-Subject Catalogue, Parasites: Trematoda and Cestoda  

E-Print Network [OSTI]

not constitute a guarantee or warranty of the pro- duct by the U.S. Department of Agriculture or an endorse- ment by the Department over other products not mentioned. '?.?-'. ?? ?>?? .?>?!;?: fi>"V :?&f*?5?. ?','< . ?? bh. rtur?ibb??? if ^ ^,:$ ? t:? imbuite... briefly discussed as examples of adaptive evolution of the parasites Acanthatrium Faust Khotenovskii, I. ?., 1974, Parazitologiia, Leningrad, v. 8 (5), 394-401 key to species Acanthatrium alicatai Macy, 1940 Khotenovskii, I. ?., 1974, Parazitologiia...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1982-01-01T23:59:59.000Z

277

Supplement 16, Part 4, Parasite-Subject Catalogue, Parasites: Nematodaa And Acanthocephala  

E-Print Network [OSTI]

longicaudata Steiner, I918 Bay of Bengal Acuaria spp. Endrejat, ?. , 1964 a fowl Assam Acuaria sp. Fitzsimmons, W. ?. , 1964 a Gallus gallus domesticus Nyasaland Acuaria anthuris Rudolphi, Stoimenov, ?., I962 a, 164 I819 Northeastern Bulgaria Pica pica... Amphimonhystera sp. Timm, R. W., [196I d], 76,77, Bay of Bengal Pl. XVIII, fig. 71 Amphimonhystrella ?. gen. Timm, R. W., [l96l d], 76, 85 Monhysteridae; Monhysteri- mt: A. megastoma n. sp. ??? Amphimonhystrella megastoma Timm, R. W., [196I d], 76, 77 n. gen...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1967-01-01T23:59:59.000Z

278

Supplement 16, Part 3, Parasite-Subject Catalogue, Parasites: Trematoda And Cestoda  

E-Print Network [OSTI]

.; and Price, C. E., 1964 a, 88 Mizelle, J. D.; and Price, C. E., 1964 a, 88 Kolesnikova, ?. ?., I963 a Syr-Darya river Ancylodiscoides vistulensis Bogdanova, ?. ?., 1961 ? Silurus glanis (gills) Volga River Mizelle, J. D.; and Price, C. E., 1964 a, 81... Volga-Don canal reservoir Kolesnikova, M. N., 1963 a all from Syr"Darya river TREMATODA Asymphylodora markevitschi [sic] Asymphylodora markevitschi (?) Kulakowskaja, 1947 fish Asymphylodora tincae LTinca tinea] Asymphylodora tincae Moeder, I...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1967-01-01T23:59:59.000Z

279

Supplement 19, Part 4, Parasite-Subject Catalogue: Parasites: Nematoda and Acanthocephala  

E-Print Network [OSTI]

., 1968 d, 743, (Johnston and Mawson) [n. 744, figs. 9-11 comb,] Syn: Habronema aegotheles Johnston and Mawson, I94I Alainchabaudia alcedinis Mawson, P. M., I968 d, 741-gen. nov., sp. nov. (tod) 743, 744, figs. 1-8 Halcyon sanctus Brisbane, Queensland... and Eysker, ?., 1968 a cross breeding experiments with A. braziliense Ancylostoma ceylanicum Yoshida, Y.j Okamoto, K.j and humans Chi?, J.-K., 1968 a, figs. I-4 dogs all from Taiwan cats Ancylostoma duodenale Bonne, C., 1941 d Netherlands Indies...

Kirby, Margie D.; Podani, Jule M.; Shaw, Judith H.; Edwards, Shirley J.; Rayburn, Jane D.; Hood, Martha W.

1975-01-01T23:59:59.000Z

280

Supplement 16, Part 5, Parasite-Subject Catalogue, Parasites: Arthropoda And Miscellaneous Phyla  

E-Print Network [OSTI]

Pozo, D., 1962 a Rothman, ?. ?. (jr.); and Fisher, F. M. (jr.), 1964 a Charleston, W. A. G., 1964 a Haemonchus contortus, lambs, blood and bone marrow change Chrz?Lstek-Spruch, H. ; Stroczynska, M.; Szajner- Milart, I.; and Uminski, J., I963 a...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1967-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Supplement 24, Part 5, Parasite-Subject Catalogue, Parasites: Arthropoda and Miscellaneous Phyla  

E-Print Network [OSTI]

(Acanthophthirius) borneoensis spec. nov., illus. Fain A 1978 Acta Zool et Path Antverpiensia (73) Nov 197-211 Wa Miniopterus australis witkampi: grottes pr?s de Long Lama, Baram Rd., Borneo Acanthophthirius (Myotimyobia) caudatus caudatus (Banks, 1910... australiensis: Womersley, 1945 Goff ML 1979 J Med Entom 15 (2) Feb 8 143-154 Wa as syn. of Odontacarus (Leogonius) australi- ensis (Hirst) Acomatacarus barrinensis n. sp., illus. Womersley H 1945 Tr Roy Soc South Australia 69 (1) July 27 96-113 Wa [no...

Edwards, Shirley J.; Hood, Martha W.; Shaw, Judith H.; Rayburn, Jane D.; Kirby, Margie D.; Hanfman, Deborah T.; Zidar, Judith A.

1982-01-01T23:59:59.000Z

282

Supplement 18, Part 3, Parasite-Subject Catalogue: Parasites: Trematoda And Cestoda  

E-Print Network [OSTI]

Oshmarin, P. G., I965 b Buriat AS SR Platonova, ?. ?., 1963 a USSR, Lake Sevan (intestine) Smirnova, V. A.; and Ibrash- eva, S. I., 1967 a, 62, fig. A Western Kazakhstan Spasskii, ?. ?.; Ro?tman, V. ?.; and Trofimenko, V. la., I965 a all from Tuva..., Hopei Province, China Ku, C.-T.j and Li, M.-M., 1968 b. China Tientsin, China Maksimova, A. P., 1967 a, 128 nil from Western Kazakhstan Belogurov, 0. I.j and Smeta- nina, Z. ?., 1963 a Kamchatka and Chukotka Ku, ?. T.; and Li, ?. ?., 1966 a, 28...

Edwards, Shirley J.; Kirby, Margie D.; Segal, Dorothy B.; Rayburn, Jane D.; Walker, Martha L.

1972-01-01T23:59:59.000Z

283

Supplement 18, Part 4, Parasite-Subject Catalogue: Parasites: Nematoda And Acanthocephala  

E-Print Network [OSTI]

, bromhydric arecoline, 1963 a piperazine adipate Amidostomum sp. [Himantopus himan- topus] Amidostomum [sp.] Branta canadensis (gizzard) Gvozdev, E. V.; and Kasymzha- nova, ?. ?., 1965 a Southern Kazakhstan Locke, L. N.j and Bagley, G. E., 1967 a... district of Tirnovo, Bul- garia Gvozdev, E. V.; and Kasymzha- nova, ?. ?., 1965 a Southern Kazakhstan 8 INDEX-CATALOGUE OF MEDICAL AND VETERINARY ZOOLOGY Amidostomum anseris geese Amidostomum anseris Anser anser Knudsen, E., 1966 a, fig. 3...

Kirby, Margie D.; Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.

1972-01-01T23:59:59.000Z

284

Supplement 20, Part 4, Parasite-Subject Catalogue: Parasites: Nematoda and Acanthocephala  

E-Print Network [OSTI]

., 1969 a as syn. of Spiroxys contortus (Rud., 1819) Agamospirura gen. sp. Tazieva, Z. Kh.; and Lobachev, Petrow, 1940 f?. S., 1970 a Mustela erminea (abdomen) Kazakhstan Altai Agamospirura ophidii Sharpilo, V?P.} and Sharpilo, Scharpilo, 1964 L. D...., 1969 a as syn. of Spiroxys contortus (Rud., 1819) Agamospirura gen. sp. Tazieva, Z. Kh.; and Lobachev, Petrow, 1940 f?. S., 1970 a Mustela erminea (abdomen) Kazakhstan Altai Agamospirura ophidii Sharpilo, V?P.} and Sharpilo, Scharpilo, 1964 L. D...

Edwards, Shirley J.; Kirby, Margie D.; Hood, Martha W.

1975-01-01T23:59:59.000Z

285

Supplement 15, Parasite-Subject Catalogue, Parasites: Arthropoda, Mesozoa, Coelenterata, Mollusca, And Annelida  

E-Print Network [OSTI]

) Adoratopsylla bisetosa Monodelphis brevicaudata Adoratopsylla dilecta Marmosa murina Aenigmopsylla sp. Central Asia & Kazakhstan Brelih, S.; and Tovornik, D., 1962 a, 91 Jugoslavia Clay, T., I96I ?, 135 West Africa Bechet, I., 196I b, 91 Rumania... Bera, Pahang, Malaya Clifford, ?. M. (jr.); and Kohls, G. M., 1962 a, figs. Syncerus caffer caffer Amphalius clarus Central Asia & Kazakhstan Amphalius runatus Mikulin, ?. ?., [i960 d], 235 Central Asia & Kazakhstan Amphalius runatus J. et R...

Humphrey, Judith M.; Segal, Dorothy B.; Beard, Mary I.; Edwards, Shirley J.; Kirby, Margie D.

1966-01-01T23:59:59.000Z

286

Supplement 17, Part 4, Parasite-Subject Catalogue, Parasites: Nematoda And Acanthocephala  

E-Print Network [OSTI]

V. I., 1964? a, fig. l(l) Kazakhstan Altai Acanthospiculum flexuosa Priadko, E. ?.; Teterin, V.l.; [Cervus elaphus] and Shol. V". ?., 1965 a, 62 Kazakhstan Achromadora sp. Picard, J. Y., 1962 a Lorraine Achromadora -ruricola (de Stradowski, M... V. I., 1964? a, fig. l(l) Kazakhstan Altai Acanthospiculum flexuosa Priadko, E. ?.; Teterin, V.l.; [Cervus elaphus] and Shol. V". ?., 1965 a, 62 Kazakhstan Achromadora sp. Picard, J. Y., 1962 a Lorraine Achromadora -ruricola (de Stradowski, M...

Segal, Dorothy B.; Humphrey, Judith M.; Edwards, Shirley J.; Kirby, Margie D.

1969-01-01T23:59:59.000Z

287

Supplement 21, Part 4, Parasite-Subject Catalogue, Parasites: Nematoda and Acanthocephala  

E-Print Network [OSTI]

from third stage larvae Amplicaecum robertsi Dobson, C., 1968 b rats, immunoglobulin response, comparison of anaphy- lactic and passive haemagglutinating activities of antibodies Amplicaecum robertsi Sprent and Mines, I960 Sprent, J. F. ?., 1970...

Zidar, Judith A.; Shaw, Judith H.; Haneman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1978-01-01T23:59:59.000Z

288

Supplement 20, Part 5, Parasite-Subject Catalogue: Parasites: Arthropoda and Miscellaneous Phyla  

E-Print Network [OSTI]

. Cricetomys gambianus Amblyomma sp. Macaca radiata Presbytis entellus Amblyomma sp. (probably A. americanum) Odocoileus virginianus Amblyomma sp. Sylvilagus floridanus mallurus Amblyomma americanum morphology, Haller's organ Amblyomma americanum... control measure Amblyomma americanum control, vegetative alteration, Gardona [Amblyomma americanum] lone star tick control by controlled burning of woodlots Amblyomma americanum Odocoileus virginianus Amblyomma americanum Hoch, A. L.; Barker, R...

Shaw, Judith H.; Hood, Martha W.

1975-01-01T23:59:59.000Z

289

Supplement 23, Part 5, Parasite-Subject Catalogue, Parasites: Arthropoda and Miscellaneous Phyla  

E-Print Network [OSTI]

human infections believed to be rickettsial in origin occurred: Los Altos de Herediana, Limon Province, Costa Rica Amblyomma spp., nymphs Garnett, W. H.; and Ahrens, ?. H., 1979, Southwest. Entom., v. 4 (3), 192-194 Odocoileus virginianus : south... human infections believed to be rickettsial in origin occurred: Los Altos de Herediana, Limon Province, Costa Rica Amblyomma spp., nymphs Garnett, W. H.; and Ahrens, ?. H., 1979, Southwest. Entom., v. 4 (3), 192-194 Odocoileus virginianus : south...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1982-01-01T23:59:59.000Z

290

Supplement 21, Part 5, Parasite-Subject Catalogue, Parasites: Arthropoda And Miscellaneous Phyla  

E-Print Network [OSTI]

and Rickettsia not isolated from ticks Lynx rufus; Sylvilagus floridanus; Urocyon cinereo- argenteus; Didelphis virginiana; Procyon lotor; Meph- itis mephitis; Odocoileus virginianus; Marmota monax; Dama dama: all from Land between the Lakes Microtus...; Sciurus carolinensis; Urocyon cinereoar- genteus; Didelphis virginiana; Procyon'lotor; Vulpes fulva; Mephitis mephitis; Odocoileus virginianus; Marmota monax; Sciurus niger: all from Land between the Lakes Amblyomma americanum (L.) Coons, L...

Zidar, Judith A.; Shaw, Judith H.; Hanfman, Deborah T.; Kirby, Margie D.; Rayburn, Jane D.; Edwards, Shirley J.; Hood, Martha W.

1978-01-01T23:59:59.000Z

291

Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Volume II Appendices A through J U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S 1 June 2008 ACRONYMS AND ABBREVIATIONS To ensure a more reader-friendly document, the U.S. Department of Energy (DOE) limited the use of acronyms and abbreviations in this Repository supplemental environmental impact statement. In addition, acronyms and abbreviations are defined the first time they are used in each chapter or appendix. The acronyms and abbreviations used in the text of this document are listed below. Acronyms and abbreviations used in tables and figures because of

292

Supplement to AEO99 - Errata  

Gasoline and Diesel Fuel Update (EIA)

1999 1999 as of 9/13/99 1. Tables 36-43 which contain supplementary data for the industrial sector have been revised. These revisions were made to better reflect energy consumption that had been incorrectly allocated to the individual industrial sectors. The revisions do not affect the total industrial consumption reported in the Annual Energy Outlook 1999. (change made on 2/9/99) 2. Tables 59-71 which contain regional electric generator data have been revised. These revisions were made to cogeneration and net energy for load values. (change made on 3/19/99) 3. The historical Lower 48 average and regional crude oil wellhead prices for 1997 were incorrectly reported in Table 79 of the Supplemental Tables to the Annual Energy Outlook 1999. The correct prices are as follows:

293

SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

most most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. INITIATED BY: [Insert Office] NO. OF PAGES/ATTACHMENTS: 2 pages, 0 attachment Summary of Changes to Policy 450.8 Environment, Safety, and Health Revised Version Issued as Policy 450.9 LM Policy 450.8 Environment, Safety, and Health of 05/29/09, has undergone minor revisions. This Policy has been revised to include a new Executive Order and make revisions for updated DOE Orders that LM abides by. Please replace LM Policy 450.8 with LM Policy 450.9.

294

Subject:  

Broader source: Energy.gov (indexed) [DOE]

0 0 ERRATA SHEET STANDARD RESEARCH SUBCONTRACT (EDUCATIONAL INSTITUTION OR NONPROFIT ORGANIZATION) Page 1. Header Information: Delete open parentheses after Phone #: and after Fax #: Page 1. Paragraph 2. Second sentence, add "(Appendix A)" after the word Provisions. In the third sentence, delete misspelled word "supercede" and replace with "supersede." Page 2. Change date to read "August 2010" throughout document. SCHEDULE OF ARTICILES, Article 1. Statement of Work: 1. Page 3, Paragraph 1, revise to read: "The Subcontractor shall perform certain research and develop work identified as "___," dated___, and more fully described in the

295

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in those parameters while in EDA H-mode, we intend to use the plasma current and the ICRF input power as our primary knobs. 4. Resources 4.1 Machine and Plasma Parameters Give...

296

SUBJECT:  

Energy Savers [EERE]

Act and the Prohibited Personnel Practices. A DOECAST was disseminated on April 24, 2013 informing the DOE workforce about the Non-Disclosure Policies, Forms and Agreements,...

297

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that will be tested with these experiments is the ability for minority ions heated by cyclotron waves to screen heavy impurities from the core. Localized heating leads to large...

298

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and recovery at ITER fields without fueling and external momentum input using Ion Cyclotron Resonance Heating (ICRH). 2. Background and goals Discuss Physics Basis of the...

299

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

attenuator (VVA) will be inserted between the LH master oscillator and the klystron drive electronics. This May 30, 2014 2 will modulate the power level roughly evenly on all...

300

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Previous operational experience indicates the need to set the Coupler Protection System (CPS) during operation into the machine. Some power conditioning will be required...

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Microsoft Word - supplement Analysis SWEIS82302.doc  

Broader source: Energy.gov (indexed) [DOE]

38SA2 38SA2 Supplement Analysis Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory Modification of Management Methods for Transuranic Waste Characterization at Los Alamos National Laboratory August 13, 2002 Department of Energy National Nuclear Security Administration Los Alamos Site Office Supplement Analysis for the SWEIS Page 1 August 13, 2002 Introduction This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Continued Operations of Los Alamos National Laboratory (SWEIS) (DOE/EIS-0238) adequately addresses the environmental effects of a waste management proposal for installing and operating modular units for the

302

Subject Access to Your Information  

E-Print Network [OSTI]

Subject Access to Your Information Sandy Tucker Texas A&M University Libraries August 1, 2006 Second International Symposium on Transportation Technology Transfer Introduction You have packages ? books, pamphlets, files, electronic documents. You... have records of packages ? cards or an online database. Other? We?re talking about adding subject information to the records of packages. Specifically, we?ll talk about using a ?controlled vocabulary.? Controlled Vocabulary Using a fixed list...

Tucker, Sandra

2006-08-01T23:59:59.000Z

303

Protection of Human Research Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes Department of Energy (DOE) procedures and responsibilities for implementing the policy and requirements set forth in Title 10 Code of Federal Regulations (CFR) Part 745, Protection of Human Subjects, 45 CFR Part 46, and the Secretarial Policy Memorandum on Military or Intelligence-Related Human Subject Research, December 9, 2009. Cancels DOE O 443.1A and DOE P 443.1A.

2009-12-09T23:59:59.000Z

304

DOE Publishes Supplemental Proposed Determination for Miscellaneous Residential Refrigeration Products  

Broader source: Energy.gov [DOE]

The Department of Energy has published a supplemental proposed determination regarding miscellaneous residential refrigeration products.

305

EIS-0026-S: Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Final Supplemental Environmental Impact Statement, Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

306

EIS-0423-S1: Draft Supplemental Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

307

Microsoft Word - CX-RiceFlatsSiteMaintenanceFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 12, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Steve Lowder Project Manager - TESM-AMPN-2 Proposed Action: Rice Flats Electrode Site Maintenance and Inspection Project Budget Information: Work Order #00219387 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately seven miles southeast of The Dalles,

308

DEVELOPMENT OF A SUPPLEMENTAL RESIDUAL CONTAMINATION GUIDELINE  

Office of Legacy Management (LM)

DEVELOPMENT OF A SUPPLEMENTAL RESIDUAL CONTAMINATION GUIDELINE DEVELOPMENT OF A SUPPLEMENTAL RESIDUAL CONTAMINATION GUIDELINE FOR THE NFSS CENTRAL DRAINAGE DITCH DECEMBER 1986 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-81OR20722 By Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 I 1.0 INTRODUCTION AND SUMMARY 1.1 OBJECTIVE AND SCOPE The objective of this report is to describe the methodology used for establishing a supplemental residual contamination guideline for the NFSS vicinity property known as the Central Drainage Ditch (CDD). Supplemental guidelines may exceed authorized guidelines if the resultant dose will not exceed the DOE radiation protection standard of 100 mrem/yr (Ref. 1). This evaluation is based on realistic exposure pathways that were

309

Microsoft Word - Price Uncertainty Supplement.doc  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

is a regular monthly supplement to the EIA Short-Term Energy Outlook. (http:www.eia.doe.govemeusteopubcontents.html) Contact: Bob Ryan (Robert.Ryan@eia.doe.gov) Energy...

310

Factors and Feeds for Supplementing Beef Cows  

E-Print Network [OSTI]

decreases, and so does diet quality. Then, supple- mentation may become necessary even if animal numbers are reduced. Factors and Feeds for Supplementing Beef Cows Stephen P. Hammack and Ronald J. Gill* *Extension Beef Cattle Specialist and Extension Live... decreases, and so does diet quality. Then, supple- mentation may become necessary even if animal numbers are reduced. Factors and Feeds for Supplementing Beef Cows Stephen P. Hammack and Ronald J. Gill* *Extension Beef Cattle Specialist and Extension Live...

Hammack, Stephen P.; Gill, Ronald J.

2000-05-03T23:59:59.000Z

311

Federal Buildings Supplemental Survey 1993  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) of the US Department of Energy (DOE) is mandated by Congress to be the agency that collects, analyzes, and disseminates impartial, comprehensive data about energy including the volume consumed, its customers, and the purposes for which it is used. The Federal Buildings Supplemental Survey (FBSS) was conducted by EIA in conjunction with DOE`s Office of Federal Energy Management Programs (OFEMP) to gain a better understanding of how Federal buildings use energy. This report presents the data from 881 completed telephone interviews with Federal buildings in three Federal regions. These buildings were systematically selected using OFEMP`s specifications; therefore, these data do not statistically represent all Federal buildings in the country. The purpose of the FBSS was threefold: (1) to understand the characteristics of Federal buildings and their energy use; (2) to provide a baseline in these three Federal regions to measure future energy use in Federal buildings as required in EPACT; and (3) to compare building characteristics and energy use with the data collected in the CBECS.

NONE

1995-11-01T23:59:59.000Z

312

Idaho Supplementation Studies : 1993 Annual Report.  

SciTech Connect (OSTI)

Idaho Supplementation Studies (ISS) will help determine the utility of supplementation as a potential recovery tool for decimated stocks of spring and summer chinook salmon, Oncorhynchus tshawytscha, in Idaho as part of a program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric power plants on the Columbia River. The objectives are to: (1) monitor and evaluate the effects of supplementation on presmolt and smolt numbers and spawning escapements of naturally produced salmon; (2) monitor and evaluate changes in natural productivity and genetic composition of target and adjacent populations following supplementation; and (3) determine which supplementation strategies provide the quickest and highest response in natural production without adverse effects on productivity. Field work began in 1991 with the collection of baseline data from treatment and some control streams. Full implementation began in 1992 with baseline data collection on treatment and control streams and releases of supplementation fish into several treatment streams. Field methods included snorkeling to estimate chinook salmon parr populations, PIT tagging summer parr to estimate parr-to-smolt survival, multiple redd counts to estimate spawning escapement and collect carcass information. Screw traps were used to trap and PIT tag outmigrating chinook salmon during the spring and fall outmigration. Weirs were used to trap and enumerate returning adult salmon in select drainages.

Leitzinger, Eric J.; Plaster, Kurtis; Hassemer, Peter

1996-12-01T23:59:59.000Z

313

Microsoft Word - Grays River Chum Supplementation Program.doc  

Broader source: Energy.gov (indexed) [DOE]

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum J. Baugher Project Manager - KEWL-4 Proposed Action: Gray's River Chum Supplementation Program Fish and Wildlife Project No.: 2008-710-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.20 Small-scale activities undertaken to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders or minor diversion channels), or fisheries. Location: Grays River, Pacific County, Washington Proposed by: Bonneville Power Administration (BPA) and the Washington Department of Fish and Wildlife (WDFW) Description of the Proposed Action: Chum salmon in the Grays River have been identified as a primary population targeted to improve to a level that contributes to recovery of the species (LCFRB

314

Microsoft Word - CX-Keeler-OregonCity_PGELineCrossing_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Shelley Fenton Realty Specialist - TERR-3 Proposed Action: Bonneville Power Administration (BPA) proposes to grant Portland General Electric Company (PGE) permission to cross its 115-kV transmission line over BPA's Keeler- Oregon City #2 transmission line. Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Grant or denial of requests for multiple use of a transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and drainage culverts. Location: Township 1 North; Range 1 West; Section 32; Willamette Meridian, Washington County, Oregon. Proposed by: BPA Description of the Proposed Action: PGE is planning to construct an overhead transmission

315

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

316

Microsoft Word - CX_Snoking_Tap_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TELF-TPP-3 Proposed Action: Access road improvement project for structure 12/1 of the Snoking Tap to Echo Lake-Monroe No. 1 Transmission Line. PP&A Project No.: 956 Budget Information: 219977 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads. Location: Approximately nine miles south of Snohomish, Washington. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to construct a permanent access road to improve vehicle access to the 115-kV Snoking Tap to Echo Lake-Monroe No. 1 Transmission

317

Microsoft Word - CX-Monroe-Custer_Bridge_Deck_at_32_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Olga Bocharov - TELF- TPP-3 Jacob Grinolds - TFBV/Snohomish Proposed Action: Bridge and access road maintenance PP&A Project No.: PP&A 1718 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities for ... rights-of-way, infrastructures...required to maintain and preserve infrastructures in a condition suitable for the facility to be used for its designated purpose. Location: Project is located in the NE/4 Sec 14, Township 32 North, Range 5 East, Snohomish County, WA Proposed by: Bonneville Power Administration (BPA), Snohomish District Description of the Proposed Action: The project consists of replacing an existing wooden

318

Microsoft Word - CX-SantiamSecondaryContainmentFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of the secondary containment system at Bonneville Power Administration's (BPA) Santiam Substation Budget Information: Work Order #: 00310540 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Santiam Substation is located approximately three miles northeast of the city of Lyons, OR, Township 9 South, and Range 1 East, Section 22. Proposed by: BPA Description of the Proposed Action: BPA proposes to bring the stormwater drainage system

319

Microsoft Word - CX-RossTransformerOilTerminalUpgradeFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

4, 2012 4, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Ross Transformer Oil Terminal Upgrade Work Order #: 00298659 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6, Additions or modifications to electric power transmission facilities Location: Ross Complex, Township 2 North, Range 1 East, Section 14 of Clark County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install four new horizontal, double walled, 20,000 gallon insulating oil storage tanks at BPA's Ross Complex. In addition, BPA would install a railcar oil pumping and transfer system as well as a truck oil transfer pad. Both the

320

Microsoft Word - CX-Libby-Troy-AR-Revised-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Dave Forward Road Designer - TELF-TPP-3 Proposed Action: Libby-Troy Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Lincoln County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade and improve access roads from Structures 23/3 through 24/6 on the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kilovolt (kV) transmission line. Background This project entails improving the several existing access roads along the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kV transmission line. Action locations for project access and road repair activities will include:

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...  

Office of Environmental Management (EM)

a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental...

322

Enforcement Guidance Supplement 03-02, Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria  

Broader source: Energy.gov (indexed) [DOE]

03-02 03-02 Department of Energy Washington, DC 20585 September 5, 2003 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: STEPHEN M. SOHINKI DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGS), which provide information or recommendations only and impose

323

Supplemental photosynthetic lighting for greenhouse tomato production  

SciTech Connect (OSTI)

The influence of supplemental light on the growth and productivity of greenhouse tomatoes grown to a single cluster on movable benches is examined, and the economic feasibility of such a system is evaluated. Experiments were conducted to quantify the tomato plants' response to various levels of supplemental light in terms of growth rate and yield at various stages in their development (e.g., seedling, flowering plant, etc.). The 1984--85 experiments showed that supplemental photosynthetic lighting nearly doubled tomato yields, from 0.48 to 0.86 lbs/plant. Subsequent experiments in 1985--86 identified the best tomato varieties for this treatment and further increased yields to 1.3 lbs/plant. In addition, the use of supplemental lighting was found to hasten tomato crop maturity. An economic analysis was performed on the 1985--86 empirical data using the tax rates and provisions then in force. It indicated that a 10-acre greenhouse could provide an after-tax internal rate of return of 10% to 12% using only equity financing. This return could likely be increased to 15--18% with the use of combined debt/equity financing. Using supplemental lighting on 10,000 acres of greenhouse production would require an estimated 7.5 billion kWh of additional electricity per year and, at 4.7 cents/kWh, generate an estimated $350 million in additional utility revenues. 48 refs., 34 figs., 24 tabs.

Godfriaux, B.L.; Wittman, W.K. (Public Service Electric and Gas Co., Newark, NJ (USA)); Janes, H.W.; McAvoy, R.J.; Putman, J.; Logendra, S. (Rutgers--the State Univ., New Brunswick, NJ (USA). Dept. of Horticulture and Forestry); Mears, D.R.; Giacommelli, G.; Giniger, M. (Rutgers--the State Univ., New Brunswick, NJ (USA). Dept. of Biological and Agricultural Engineering)

1989-12-01T23:59:59.000Z

324

Supplement: Commodity Index Report | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Supplement: Commodity Index Report Supplement: Commodity Index Report Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Supplement: Commodity Index Report Dataset Summary Description Shows index traders in selected agricultural markets. These traders are drawn from the noncommercial and commercial categories. The noncommercial category includes positions of managed funds, pension funds, and other investors that are generally seeking exposure to a broad index of commodity prices as an asset class in an unleveraged and passively-managed manner. The commercial category includes positions for entities whose trading predominantly reflects hedging of over-the-counter transactions involving commodity indices, for example, a swap dealer holding long futures positions to hedge a short commodity index exposure opposite institutional traders, such as pension funds.

325

Definition: Operating Reserve - Supplemental | Open Energy Information  

Open Energy Info (EERE)

Supplemental Supplemental Jump to: navigation, search Dictionary.png Operating Reserve - Supplemental The portion of Operating Reserve consisting of: Generation (synchronized or capable of being synchronized to the system) that is fully available to serve load within the Disturbance Recovery Period following the contingency event; or, Load fully removable from the system within the Disturbance Recovery Period following the contingency event.[1] View on Wikipedia Wikipedia Definition In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply. Most power systems are designed so that, under normal conditions, the operating reserve is always at least the capacity of the

326

Research Using Human Subjects/Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Using Human SubjectsMaterials (taken in part from "Research on Human Specimens", National Institutes of Health) A 'human subject' is a living individual about whom an...

327

Microsoft Word - STEO Supplement.doc  

Gasoline and Diesel Fuel Update (EIA)

09 09 1 May 2009 Short-Term Energy Outlook Supplement: The Implications of Lower Natural Gas Prices for the Electric Generation Mix in the Southeast 1 Highlights * This supplement to the Energy Information Administration's (EIA) May 2009 Short-Term Energy Outlook (STEO) focuses on changes in the utilization of coal- and natural-gas-fired generation capacity in the electric utility sector as the differential between delivered fuel prices narrows. * Over the last year the price of natural gas delivered to electric generators has fallen dramatically. Current natural gas prices now present increased potential for displacing coal-fired electricity generation with natural-gas-

328

SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC  

Broader source: Energy.gov (indexed) [DOE]

0-SA-02 0-SA-02 September 2013 SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT FOR PLUTONIUM-238 PRODUCTION FOR RADIOISOTOPE POWER SYSTEMS (DOE/EIS-031 0-SA-02) U.S. DEPARTMENT OF ENERGY 1.0 1.6 2.0 3.0 4.0 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 3.1 3.2 4.1 4.2 TABLE OF CONTENTS INTRODUCTION ............................................................................................................ 1 Overview ........................................................................................................................ . 1 Background ..................................................................................................................... 2 Purpose and Need for this Supplement Analysis ............................................................ 6

329

SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 0-SA-02 1 0-SA-02 September 2013 SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT FOR PLUTONIUM-238 PRODUCTION FOR RADIOISOTOPE POWER SYSTEMS (DOE/EIS-031 0-SA-02) U.S. DEPARTMENT OF ENERGY 1.0 1.6 2.0 3.0 4.0 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 3.1 3.2 4.1 4.2 TABLE OF CONTENTS INTRODUCTION ............................................................................................................ 1 Overview ........................................................................................................................ . 1 Background ..................................................................................................................... 2 Purpose and Need for this Supplement Analysis ............................................................ 6

330

EIS-0281-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis EIS-0281-SA-03: Supplement Analysis Installation of a Petawatt Laser System in TA-IV Department of Energy has identified a need to revitalize High Energy...

331

EIS-0251-SA-01: Supplement Analysis | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EIS-0251-SA-01: Supplement Analysis EIS-0251-SA-01: Supplement Analysis Container System for the Management of DOE Spent Nuclear Fuel Located at the INEEL The Proposed Action...

332

EIs-0285-0455: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIs-0285-0455: Supplement Analysis EIs-0285-0455: Supplement Analysis Transmission System Vegetation Management Program FEIS-- (Bandon-Rogue No. 1) PP&A Project 2178 The project...

333

EIS-0243-SA-02: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

-SA-02: Supplement Analysis EIS-0243-SA-02: Supplement Analysis Nevada Test Site and Off-Site Locations in the State of Nevada to Address the Increase in Activities Associated with...

334

EIS-0026-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis EIS-0026-SA-04: Supplement Analysis Use of the 10-160B Transportation Cask for RH-TRU Waste Shipments to WIPP, Carlsbad Field Office DOE is proposing to use...

335

Q MEtlORANDUM SUBJECT:  

Office of Legacy Management (LM)

Q Q , MEtlORANDUM SUBJECT: --m--w OWNER(S) ------Be PIIt a Current: ------------------------ -------------------------- Owner contacted 0 yes 0 no; if yer, date contacted ------------- TYPE OF OPERATION ----------------- wesearch & Dove1 opment s Facility Type 0 Production acalr testing e Pilot Scale 6 Bench Scale Process 0 Theoretical Studies - 0 Sample & Analysis s tlmufacturing 0 University (J Research Organization 0 Government Sponsored Facility 0 Other. --------------------- 0 Production 0 Disposal /Storage TYPE OF CONTRACT ---------------- 0 Other information (i-h., cost + fixed fee, unit price, time 81 material, l tc) -we---- dI- ,~~_73 --------------------------- ---------------------------- Contract/Purchase Order 4+/ ------------------

336

Block and Tub Supplements for Grazing Beef Cattle  

E-Print Network [OSTI]

Block and Tub Supplements for Grazing Beef Cattle Rick Machen, Texas Cooperative Extension Jim Drouillard, Kansas State University Joe Harris, Westway Corporation B lock supplements are a convenient mechanism for delivering supplemental... have off-ranch employment and like the convenience and comfort of knowing sup- Rick Machen E-178 3-03 plement is continuously available. Large operators use blocks because they save time and labor. 2 As with other supplements, blocks and tubs can vary...

Machen, Richard V.

2003-03-19T23:59:59.000Z

337

Short-term energy outlook annual supplement, 1993  

SciTech Connect (OSTI)

The Short-Term Energy Outlook Annual Supplement (supplement) is published once a year as a complement to the Short-Term Energy Outlook (Outlook), Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts.

NONE

1993-08-06T23:59:59.000Z

338

Supplement to the Annual Radiological Environmental Operating  

E-Print Network [OSTI]

The attachment to this letter contains a supplemental corrective update to the referenced report for calendar year 2004. There are no new regulatory commitments contained in this submittal We trust that the information provided is adequate; however, should you have questions or require additional information, please contact me at (802) 258-4236. Sincerely,

Vermont Yankee; Aames M. Devincentis

2005-01-01T23:59:59.000Z

339

Supplemental Data Molecular Cell, Volume 36  

E-Print Network [OSTI]

, and RNAi S2-NP cells were maintained in Schneider's medium (Invitrogen, Carlsbad, CA) supplemented with 10% FBS and 1% Pen-Strep (Invitrogen, Carlsbad, CA). Cells were transfected with an expression construct (Invitrogen, Carlsbad, CA). 30 µg total RNAs from cultured cells (with or without -elimination) or RNAs from

Higgins, Darren

340

Supplemental Tables to the Annual Energy Outlook  

Reports and Publications (EIA)

The Annual Energy Outlook (AEO) Supplemental tables were generated for the reference case of the AEO using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets. Most of the tables were not published in the AEO, but contain regional and other more detailed projections underlying the AEO projections.

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Supplemental Data The Arabidopsis Chromatin-Modifying  

E-Print Network [OSTI]

-1 45S siR Nucleolar dot observed: Dispersed nuclear signal: No signal: # nuclei observed 100 0 0 n = 75 = 62 0 9 91 n = 72 0 29 71 n = 76 5S siR Nucleolar dot observed: Dispersed nuclear signal: No signal1 Supplemental Data The Arabidopsis Chromatin-Modifying Nuclear siRNA Pathway Involves a Nucleolar

Jacobsen, Steve

342

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-33)  

Broader source: Energy.gov (indexed) [DOE]

1, 2003 1, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-33) Ron Morinaka Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Gooderich Bayou Culvert Replacement (Hungry Horse Fisheries Mitigation Program) Project No: 1991-019-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals - Removal or Reduction of Undesirable Wildlife Species. Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife, and Parks (MFWP) Description of the Proposed Action: BPA is proposing to fund a fish barrier project with Montana Fish,

343

EIS (DOE/EIS-0246/SA-17) Supplement Analysis for the Wildlife Management Program EIS  

Broader source: Energy.gov (indexed) [DOE]

September 13, 2001 September 13, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) Joe HeHerrera - KEWU Fish and Wildlife Project Manager Proposed Action: Eagle Lakes Ranch Acquisition and Restoration Project No: 2000-025-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee-Title Acquisition Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service (USFWS), Columbia National Wildlife Refuge Description of the Proposed Action: BPA proposes to partially fund the acquisition of 7,630 acres

344

Risk Assessment Guidance for Superfund Volume I: Human Health Evaluation Manual Supplemental Guidance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-921314 1-921314 OSWER DIRECTIVE: 9285.6-03 March 25, 1991 RISK ASSESSMENT GUIDANCE FOR SUPERFUND VOLUME I: HUMAN HEALTH EVALUATION MANUAL SUPPLEMENTAL GUIDANCE "STANDARD DEFAULT EXPOSURE FACTORS" INTERIM FINAL Office of Emergency and Remedial Response Toxics Integration Branch U.S. Environmental Protection Agency Washington, D.C. 20460 (202)475-9486 REPRODUCED BY U.S.DEPARTMENT OF COMMERCE NATIONAL TECHNICAL INFORMATION SERVICE SPRINGFIELD, VA 22161 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 MAR 25 1991 S O L I D W A S T E A N D E M E R G E N C Y R E S P O N S E O F F I C E O F OSWER Directive 9285.6-03 MEMORANDUM SUBJECT: FROM: Human Health Evaluation Manual, Supplemental Guidance: TO: Director, Waste Management Division, Regions I, IV, V, & VII Director, Emergency & Remedial Response Division,

345

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-37)  

Broader source: Energy.gov (indexed) [DOE]

January 16, 2004 January 16, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-37) Charlie Craig - KEWU-4 Fish and Wildlife Project Manager Proposed Action: Blue Creek Winter Range - Spokane Reservation (Acquisition of Sampson, Lantzy, Allotment #0065-C, and Allotment 154 Properties) Project No: 1991-062-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.1 Fee Title Acquisition and Transfer Location: On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington Proposed by: Bonneville Power Administration (BPA) and the Spokane Tribe of Indians Description of the Proposed Action: BPA proposes to fund the purchase of four parcels of land

346

Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA - New Acclimation Sites  

Broader source: Energy.gov (indexed) [DOE]

November 18, 2002 November 18, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA (DOE/EA-1282/SA-03) L. Hermeston - KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: New acclimation sites Project No: 1996-040-00 Location: Upper Wenatchee watershed, Chelan County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA is funding ongoing studies, research, and artificial production of coho salmon in the Wenatchee and Methow river basins. BPA analyzed environmental impacts of these activities in the Mid-Columbia Coho Reintroduction Feasibility Project Final EA, completed in April 1999 (DOE/EA-1282). Supplemental Analyses (DOE/EA-

347

Enforcement Guidance Supplement 05-01, Contractor Investigation, Causal Analysis, and Corrective Actions  

Broader source: Energy.gov (indexed) [DOE]

23, 2005 23, 2005 MEMORANDUM FOR: DOE AND CONTRACTOR PRICE-ANDERSON AMENDMENTS ACT COORDINATORS FROM: STEPHEN M. SOHINKI DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. Such guidance is typically issued in the form of an Enforcement Guidance Supplement (EGS). As part of the investigation of potential nuclear safety noncompliances, OE routinely reviews the contractor's investigation of the noncompliance, the associated causal

348

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-35)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-35) Joe Deherrera Fish and Wildlife Project Manager Proposed Action: Malheur Wildlife Mitigation Project- Denny Jones Ranch Project No: 200002700 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.0 Plant Propagation Techniques; 4.0 Water Development and Management; 5.0 Water Distribution Techniques; 6.0 Fire Management Techniques (prompt fire suppression and fuels management, natural fire management), 7.0 Vegetation Management (herbicide, hand pulling, prescribed burns, water level manipulation); 8.2 Control of Predators and

349

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-25)  

Broader source: Energy.gov (indexed) [DOE]

June 11, 2002 June 11, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-25) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Purchase of Fisher River Conservation Easement (Fiscal Years 2002-2004) Project No: 2002-044-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: near Libby, Lincoln County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a portion of the cost of a conservation easement on 56,400 acres of land along the Fisher River to preclude development

350

Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38)  

Broader source: Energy.gov (indexed) [DOE]

14, 2004 14, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38) Joe DeHerrera Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Proposed Weaver Slough Conservation Easement Project No: 2002-042 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS [page A/2]): 1.2 Easement Acquisition Location: Flathead River System, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Flathead Land Trust Description of the Proposed Action: BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that

351

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91)  

Broader source: Energy.gov (indexed) [DOE]

, 2002 , 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91) Tom Morse, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat (Evans Creek Culvert Replacement) Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.13 Culvert removal/replacement to improve fish passage, 2.1 Maintain healthy riparian plant communities, 2.4 Provide filter strips to catch sediment and other pollutants, 2.6 Native seeds inventory, 2.7 Avoid exotic species, 7.2 Install hydraulic structures at low streamflows, 7.3 Minimize erosion

352

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57)  

Broader source: Energy.gov (indexed) [DOE]

July 12, 2001 July 12, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57) Allyn Meuleman - KEWU Fish and Wildlife Project Manager Proposed Action: Idaho Fish Screening Improvement (Champion, Iron, Fourth of July, Goat Creeks) Project No: 1994-015-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish passage enhancement - fishways; 4.25 Consolidate/Replace irrigation diversion dams; 4.10 Water Conveyance: pipeline. Location: Stanley, Custer County, Idaho. Proposed by: Bonneville Power Administration (BPA) and the Idaho Department of Fish and Game. Description of the Proposed Action: BPA proposes to fund a project that will enhance in-stream

353

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83)  

Broader source: Energy.gov (indexed) [DOE]

19, 2002 19, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83) John Baugher Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Bear Creek Irrigation Siphon Project Project No: 1993-066-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities; 2.4 Provide Filter Strips to

354

EIS (DOE/EIS-0246-SA-24) Supplement Analysis for the Wildlife MitigationProgram EIS  

Broader source: Energy.gov (indexed) [DOE]

3, 2002 3, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-24) David Sill Fish and Wildlife Project Manager Proposed Action: Herbert Conservation Easement Project No: 1992-068-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: Benton County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Oregon Department of Fish and Wildlife (ODFW) Description of the Proposed Action: BPA proposes to purchase a conservation easement on approximately 221 acres of the Herbert parcel in Benton County, Oregon for the protection of wetland, riparian, and riverine habitats. The Herbert parcel is located within the Willamette

355

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-36)  

Broader source: Energy.gov (indexed) [DOE]

October 10, 2003 October 10, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-36) Joe DeHerrera- KEWN-4 Fish and Wildlife Project Manager Proposed Action: Logan Valley Wildlife Mitigation Project-Implemetation of Wildlife Mitigation Plan Project No: 200000900 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.0 Plant Propagation Techniques; 4.0 Water Development and Management; 5.0 Water Distribution Techniques; 6.0 Fire Management Techniques (prompt fire suppression and fuels management, natural fire management), 7.0 Vegetation Management (herbicide, hand pulling, prescribed burns, water level manipulation); 8.0 Species Manangement

356

Subject: Cost and Price Analysis  

Broader source: Energy.gov (indexed) [DOE]

No. AL-2009-03 Revision 1 No. AL-2009-03 Revision 1 Acquisition Regulation Date July 9, 2010 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Procurement Executives. Subject: Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning References: FAR Subpart 6.1 Full and Open Competition FAR Subpart 6.3 Other than Full and Open Competition FAR Part 7 Acquisition Planning FAR Part 34 Major System Acquisition DEAR Subpart 917.6 Management and Operating Contracts DEAR 970.1706-1 Award, Renewal, and Extension Acquisition Guide Chapter 7.1, Acquisition Planning Acquisition Guide Chapter 42.5, Contract Management

357

Subject: Cost and Price Analysis  

Broader source: Energy.gov (indexed) [DOE]

No. AL-2009-03 No. AL-2009-03 Acquisition Regulation Date 12/23/08 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Procurement Executives. Subject: Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning References: FAR Subpart 6.1 Full and Open Competition FAR Subpart 6.3 Other than Full and Open Competition FAR Part 7 Acquisition Planning FAR Part 34 Major System Acquisition DEAR Subpart 917.6 Management and Operating Contracts DEAR 970.1706-1 Award, Renewal, and Extension Acquisition Guide Chapter 7.1, Acquisition Planning Acquisition Guide Chapter 42.5, Contract Management Planning When is this Acquisition Letter (AL) effective?

358

MEMORANDU TO: FILE FHOM: SUBJECT:  

Office of Legacy Management (LM)

' .- _. I _ ' ' .- _. I _ ' 1.3 7 -3 , MEMORANDU TO: FILE FHOM: SUBJECT: Curre"t: Ll&k&&d ________ l- ; if yes, date contacted ___ 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis 0 Production 0 Disposal /Storage TYPE OF CONTRACT --------------_- 0 Prime 13 Subcontract& 0 Purchase Order 0 Cl Facility Type 0 Manufacturing 0 University 0 Research Organization *i Government Sponsored Facility 0 Other --------------_-----_ Other information (i.e., cost + fixed fee, unit price, time & material, qtc) --------------------~~------ OWNERSHIP: AEC/UED AEWUED GOUT GOUT CONTRACTOR CONTRACTOR OWN!3 LEAS!32 @!NE_D LEEsE_n OWNED --_----___ --LEEEI) LANDS D 0 BUILDINGS EQUIPMENT : : cl 0

359

TO: FILE FROM: I SUBJECT:  

Office of Legacy Management (LM)

TO: FILE TO: FILE FROM: I .- SUBJECT: 9EEEW Pos$:&&~ rk/ErvlK& @orzb Current: Lov?r_ &%2J*l&o3?fi; Owner contacted 0 yes &no; if yes, date contacted . TYPE OF OPERATION ----------------- q Research & Development @ Facility Type 0 Production scale testing 0 Pilot Scale & rlanuf acturing 0 Bench Scale Process 0 University 0 Theoretical Studies 0 Research Organizatil 0 Sample SC Analysis 0 Government Sponsarec 0 Other -------------_ q Production 0 Disposal /Storage TYPE CIF CONTRACT ~------_~-~----_ q Prime 0 0 Subcontract& Other information (i.e. 0 Purchase Order + fixed fee, unit prier time 81 material, t+tc:)-- ------------w-----z-. Contract/Purchase Order #-&)A (c& YJ c -7 / -t 4,&>~c-~7~7------ --- -7

360

DOE/EIS-0236/SA-6 Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

DATE: REPLY TO ATTN OF: DP-45 (G. Palmer, 6-1785) SUBJECT: DETERMINATION OF THE NEED FOR ADDITIONAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REVIEW TO: Dave Beck, DP-20 As requested in your action memorandum, same subject, I have reviewed the attached Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement, dated August 1999. This analysis was prepared in accordance with 10 CFR 1021.314, contains the comments on the draft Supplement Analysis, dated June 1999, and responds to the comments in Appendix D. Based on my review of the six issues analyzed in the Supplement Analysis, I have determined that none of the information and analysis represent substantial changes to the actions

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EIS-0407-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0407-SA-01: Supplement Analysis Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas This EIS analyzed the potential direct, indirect, and cumulative environmental impacts of the design, construction, and startup of a biomass-to-ethanol and energy production facility--the Biorefinery Project. The Supplement Analysis examines the potential environmental impacts of the Modified Proposed Action and addresses whether the potential environmental impacts are within the range of the potential environmental impacts analyzed in the FEIS. Supplement Analysis for the Final environmental Impact Statement for the Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas (EIS-0407-SA-1) (July 2011)

362

Idaho Supplementation Studies, 1991-1992 Annual Report.  

SciTech Connect (OSTI)

Idaho Supplementation Studies (ISS) will help determine the utility of supplementation as a potential recovery tool for decimated stocks of spring and summer chinook salmon Oncorhynchus tshawytscha in Idaho. The objectives are to monitor and evaluate the effects of supplementation on presmolt and smolt numbers and spawning escapements of naturally produced salmon; monitor and evaluate changes in natural productivity and genetic composition of target and adjacent populations following supplementation and; determine which supplementation strategies (broodstock and release stage) provide the quickest effects on and highest response in natural production without adverse productivity.

Leitzinger, Eric J.; Bowles, Edward C.; Plaster, Kurtis (Idaho Department of Fish and Game, Boise, ID)

1993-10-01T23:59:59.000Z

363

EIS-0203-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0203-SA-02: Supplement Analysis INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This second Supplement Analysis (2005 SA) examined the changes to activities at the INL Site since the 2002 SA. The 2005 Supplement Analysis did not re-do the analyses conducted in the 2002 SA but evaluated actions from that time forward. The 2005 SA reviewed all NEPA documentation prepared since the 2002 Supplement Analysis to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. It also examined INL Site operations program by program to determine what changes had taken place and whether they were

364

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Broader source: Energy.gov (indexed) [DOE]

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

365

EIS-0265-SA-165: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

65-SA-165: Supplement Analysis 65-SA-165: Supplement Analysis EIS-0265-SA-165: Supplement Analysis Watershed Management Program - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing. Supplement Analysis for the Watershed Management Program EIS, - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence, DOE/EIS-0265-SA-165 (August 2004) More Documents & Publications EIS-0265-SA-169: Supplement Analysis EIS-0265-SA-57: Supplement Analysis EIS-0265-SA-58: Supplement Anlalysis

366

EIS-0225-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0225-SA-01: Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components - AL-R8 Sealed Insert Container This SA is submitted according to the requirements for determining the need for supplemental EISs (10 CFR 1021.3(4) in DOE's regulations for NEPA implementation. This SA specifically addresses the issue of another type of container for the pit repackaging system. DOE/EIS-0225, Supplement Analysis for Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components - AL-R8 Sealed Insert Container (August 1998) More Documents & Publications EIS-0225-SA-03: Supplement Analysis EIS-0225-SA-04: Supplement Analysis

367

EA-1173-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

73-SA-01: Supplement Analysis 73-SA-01: Supplement Analysis EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to take additional data on summer steelhead that are trapped at the existing adult collection weirs on the upper Grande Ronde River and Catherine Creek. Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) (December 2003) More Documents & Publications EA-1173: Final Environmental Assessment EIS-0340: Draft Environmental Impact Statement

368

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Broader source: Energy.gov (indexed) [DOE]

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

369

EIS-0203-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

203-SA-02: Supplement Analysis 203-SA-02: Supplement Analysis EIS-0203-SA-02: Supplement Analysis INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This second Supplement Analysis (2005 SA) examined the changes to activities at the INL Site since the 2002 SA. The 2005 Supplement Analysis did not re-do the analyses conducted in the 2002 SA but evaluated actions from that time forward. The 2005 SA reviewed all NEPA documentation prepared since the 2002 Supplement Analysis to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. It also examined INL Site operations program by program to determine what changes had taken place and whether they were

370

Name___________________________________________________________________________________ Subject Categories The dissertation database is arranged by subject categories. Please select the one subject which most nearly describes  

E-Print Network [OSTI]

Categories The dissertation database is arranged by subject categories. Please select the one subject which . . . . . . . . . . 0729 Art History . . . . . . . . . . 0377 Cinema . . . . . . . . . . . . . 0900 Dance and Counseling . .0519 Health . . . . . . . . . . . . . . .0680 Higher . . . . . . . . . . . . . . .0745 History

Northern British Columbia, University of

371

Federal Buildings Supplemental Survey -- Publication and Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Overview > Publication and Tables Overview > Publication and Tables Publication and Tables Percent of FBSS Buildings and Floorspace by Selected Agencies, FY 1993 Percent of FBSS buildings and floorspace by selected agencies, FY 1993 Sources: Energy Information Administration, Energy Markets and End Use, 1993 Federal Buildings Supplemental Survey. Separater Bar Separater Bar You have the option of downloading the entire report or selected sections of the report. Full Report - Federal Buildings Supplemental Survey, 1993 (file size 1.15 MB) pages: 183 Selected Sections Main Text (file size 161,775 bytes) pages: 17. - Requires Adobe Acrobat Reader Contacts Preface Contents Introduction At a Glance Highlights on Federal Buildings Detailed Tables Appendices Appendix A. How the Survey Was Conducted (file size 45,191 bytes) pages: 8.

372

Energy Information Administration (EIA) - Supplement Tables  

Gasoline and Diesel Fuel Update (EIA)

6 6 1 to 116 Complete set of Supplemental Tables Complete set of Supplemental Tables. Need help, please contact the National Energy Information Center at 202-586-8800. Regional Energy Consumption and Prices by Sector Energy Consumption by Sector Table 1. New England Consumption & Prices by Sector & Census Division Tables. Need help, contact the National Energy Information Center at 202-586-8800. Table 2. Middle Atlantic Consumption & Prices by Sector & Census Division Tables. Need help, contact the National Energy Information Center at 202-586-8800. Table 3. East North Central Consumption & Prices by Sector & Census Division Tables. Need help, contact the National Energy Information Center at 202-586-8800. Table 4. West North Central

373

Supplement to the annual energy outlook 1994  

SciTech Connect (OSTI)

This report is a companion document to the Annual Energy Outlook 1994 (AEO94), (DOE/EIA-0383(94)), released in Jan. 1994. Part I of the Supplement presents the key quantitative assumptions underlying the AEO94 projections, responding to requests by energy analysts for additional information on the forecasts. In Part II, the Supplement provides regional projections and other underlying details of the reference case projections in the AEO94. The AEO94 presents national forecasts of energy production, demand and prices through 2010 for five scenarios, including a reference case and four additional cases that assume higher and lower economic growth and higher and lower world oil prices. These forecasts are used by Federal, State, and local governments, trade associations, and other planners and decisionmakers in the public and private sectors.

NONE

1994-03-01T23:59:59.000Z

374

DLA Energy: Your Supplemental Energy Contracting Venue  

Broader source: Energy.gov (indexed) [DOE]

WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP DEFENSE LOGISTICS AGENCY AMERICA'S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT DLA Energy Your Supplemental Energy Contracting Avenue Cynthia Obermeyer Contracting Officer DLA Energy April 2012 2 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

375

Enforcement Guidance Supplement 02-01 Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation  

Broader source: Energy.gov (indexed) [DOE]

February 21, 2002 February 21, 2002 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance

376

The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

Fix, N. J.

2007-01-10T23:59:59.000Z

377

Washington Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Washington Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 15 13 15 11 11 9 10 21 79 154 1990's 181 154 180 4 0 0 0 0 0 0 2000's 0 0 0 0 0 0 0 0 0 0 2010's 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Washington Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply & Disposition

378

Minnesota Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Minnesota Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 48 106 337 1 3 11 2 1 385 315 1990's 56 49 52 78 289 194 709 172 50 64 2000's 101 118 13 42 71 154 13 54 46 47 2010's 12 20 9 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Minnesota Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

379

District of Columbia Natural Gas Input Supplemental Fuels (Million Cubic  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) District of Columbia Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 2 1 46 0 0 0 0 0 0 0 1990's 0 0 0 0 0 0 0 0 0 0 2000's 0 0 0 0 0 0 0 0 0 0 2010's 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas District of Columbia Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply & Disposition)

380

Maryland Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Maryland Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 484 498 984 352 332 373 155 136 743 899 1990's 24 72 126 418 987 609 882 178 80 498 2000's 319 186 48 160 124 382 41 245 181 170 2010's 115 89 116 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Maryland Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Iowa Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Iowa Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 57 64 68 23 53 45 44 40 34 82 1990's 81 46 45 84 123 96 301 137 17 12 2000's 44 39 23 143 30 31 46 40 27 3 2010's 2 1 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Iowa Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply & Disposition

382

Pennsylvania Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Pennsylvania Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 3,127 10,532 5,621 3,844 82 221 196 247 254 305 1990's 220 222 132 110 252 75 266 135 80 119 2000's 261 107 103 126 131 132 124 145 123 205 2010's 4 2 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Pennsylvania Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

383

EA-1374-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EA-1374-SA-03: Supplement Analysis Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project The Bonneville Power Administration (BPA) is funding ongoing research on Caspian terns, double-crested cormorants, and several species of gulls (glaucous-winged, western, California, and ring-billed) begun in 1996. BPA analyzed environmental impacts of the research in an Environmental Assessment (EA) completed in 2001 (DOE/EA-1374). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze additional research activities proposed as part of that project. Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project, Supplement Analysis DOE/EA-1374-SA-03 (April 2003)

384

EIS-0285-SA-123: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management on Malin-Hilltop. Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on controlling these trees by removal. In addition, sagebrush along access roads and within 30 feet of structures will be mowed for fire prevention purposes. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123) Malin-Hilltop (February 2003) More Documents & Publications EIS-0285-SA-118: Supplement Analysis EIS-0285-SA-133: Supplement Analysis

385

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Guidance Supplement 01-01: Nuclear Weapon Program Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities.This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

386

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

S1: Draft Supplemental Programmatic Environmental Impact S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement EIS-0236: Record of Decision DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

387

Missouri Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Missouri Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 65 60 2,129 1,278 326 351 1 1 2 1,875 1990's 0 0 0 0 371 4 785 719 40 207 2000's 972 31 62 1,056 917 15 78 66 6 10 2010's 18 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Missouri Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

388

Rhode Island Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Rhode Island Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 257 951 718 594 102 130 182 109 391 219 1990's 51 92 155 126 0 27 42 18 1 1 2000's 0 0 0 0 0 0 0 0 0 0 2010's 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Rhode Island Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

389

EIS-0285-SA-32: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

32: Supplement Analysis 32: Supplement Analysis EIS-0285-SA-32: Supplement Analysis Watershed Management Program - Walla Walla County, Washington Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. DOE/EIS-0285-SA-32, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Walla Walla County, Washington (November 2001) More Documents & Publications EIS-0285-SA-02: Supplement Analysis EIS-0285-SA-64: Supplement Analysis

390

EIS-0169-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0169-SA-03: Supplement Analysis EIS-0169-SA-03: Supplement Analysis EIS-0169-SA-03: Supplement Analysis Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington The purpose of this Supplement Analysis is to determine if a Supplemental EIS is needed to analyze the use of the WDFW's existing Yakima Hatchery for rearing and possibly incubating coho. Additional acclimation and research activities for coho are also analyzed. DOE/EIS-0169-SA-03, Supplement Analysis for Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington (March 2000)

391

EIS-0169-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0169-SA-04: Supplement Analysis EIS-0169-SA-04: Supplement Analysis EIS-0169-SA-04: Supplement Analysis Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities The purpose of this Supplement Analysis is to determine if a Supplemental EIS is needed to analyze the construction/modification upgrades to the Yakima Klickitat Fisheries Project (YKFP) fall chinook and coho experimental facilities at the Prosser and Marion Drain Hatcheries. Construction/modifications are in support of the experimental acclimation, rearing and incubating activities for coho and fall chinook. DOE/EIS-0169-SA-04: Supplement Analysis for Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities (November 2000)

392

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

36-S1: Draft Supplemental Programmatic Environmental Impact 36-S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

393

Georgia Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Georgia Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 24 57 151 84 28 121 124 248 241 292 1990's 209 185 166 199 123 130 94 14 16 12 2000's 73 51 7 14 5 0 3 2 52 2010's 732 701 660 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Georgia Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

394

Delaware Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Delaware Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 55 135 56 20 13 12 9 0 2 18 1990's 4,410 4,262 3,665 3,597 3,032 1 1 2 0 0 2000's 6 0 0 7 17 0 W 5 2 2 2010's 1 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Delaware Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply & Disposition

395

South Dakota Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) South Dakota Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 9 24 50 1 0 0 0 0 10 16 1990's 10 3 10 9 61 37 87 30 4 5 2000's 13 5 3 57 5 4 0 1 0 0 2010's 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas South Dakota Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply & Disposition

396

EIS-0203-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0203-SA-04: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project The NRF SPC Disposition Project would provide for the receipt, storage, characterization, certification and preparation of RH-TRU waste for transportation and disposition at WIPP. Currently, the 92 SPCs containing the RH-TRU waste are stored in hot cells and storage areas at NRF. Removing the RH-TRU waste would allow NRF operations to use the hot cells and storage for other projects. DOE/EIS-0203-F-SA-04 & DOE/EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project (May 2009) More Documents & Publications EIS-0203-SA-02: Supplement Analysis EIS-0203-SA-01: Supplement Analysis EIS-0203: Record of Decision

397

EA-1429-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9-SA-01: Supplement Analysis 9-SA-01: Supplement Analysis EA-1429-SA-01: Supplement Analysis Security Perimeter Project This Supplement Analysis (SA) has been prepared to determine if previous Department of Energy (DOE), National Nuclear Security Administration (NNSA) environmental assessments (EAs), including EA-1429 Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory, Los Alamos, New Mexico adequately address the environmental effects of a proposed modification to the location and alignment of a bypass road at Technical Area (TA) 3, or if this EA or others need to be supplemented. Supplement Analysis Security Perimeter Project, DOE/EA-1429-SA (February 2003) More Documents & Publications EA-1429: Final Environmental Assessment

398

EIS-0169-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0169-SA-02: Supplement Analysis EIS-0169-SA-02: Supplement Analysis EIS-0169-SA-02: Supplement Analysis Yakima Fisheries Project-Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery. Cle Elum Supplementation and Research Facility, Cle Elum, Washington The Yakima Fisheries Project is co-managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). The project consists of the collection of salmonid broodstock, incubation of eggs and rearing of fry in hatcheries, the acclimation and release of smolts, and related ecological studies in the study of natural production. DOE/EIS-0169-SA-02: Supplement Analysis for Yakima Fisheries Project-Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery. Cle Elum Supplementation and Research Facility,

399

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

400

EA-1374-SA-05: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis 5: Supplement Analysis EA-1374-SA-05: Supplement Analysis Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project The Bonneville Power Administration (BPA) is funding ongoing research on Caspian terns, double-crested cormorants, and several species of gulls (glaucous-winged, western, California, and ring-billed) begun in 1996. BPA analyzed environmental impacts of the research in an Environmental Assessment (EA) completed in 2001 (DOE/EA-1374). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze additional research activities proposed as part of that project. Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project, Supplement Analysis DOE/EA-1374-SA-05 (March 2006)

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EA-1792-S1: Final Supplemental Environmental Assessment | Department of  

Broader source: Energy.gov (indexed) [DOE]

2-S1: Final Supplemental Environmental Assessment 2-S1: Final Supplemental Environmental Assessment EA-1792-S1: Final Supplemental Environmental Assessment DOE's Golden Field Office has prepared this supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine, Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Final Supplemental Environmental Assessment More Documents & Publications EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792: Draft Environmental Assessment EA-1792-S1: Finding of No Significant Impact

402

EIS-0220-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0220-SA-01: Supplement Analysis EIS-0220-SA-01: Supplement Analysis EIS-0220-SA-01: Supplement Analysis Seismic Activity on H-Canyon Incorporating up-to-date seismic data, WSRC completed a detailed evaluation of the likelihood of a severe earthquake and the estimated resulting structural damage of H-Canyon. This evaluation indicated that a severe earthquake capable of producing structural damage comparable to that described in the IMNM EIS would not occur more frequently than once in 5500 years. That is less frequent than the severe earthquake occurrence assumed in the IMNM EIS (1/5000 years). DOE/EIS-0220, Supplement Analysis of Seismic Activity on H-Canyon (January 1997) More Documents & Publications EIS-0220-SA-01: Supplement Analysis EIS-0220: Supplemental Record of Decision EIS-0220: Final Environmental Impact Statement

403

EIS-0082-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-01: Supplement Analysis SA-01: Supplement Analysis EIS-0082-SA-01: Supplement Analysis Salt Processing Alternatives at the Savannah River Site, Savannah River Operations Office, Aiken, South Carolina The purpose of this Supplement Analysis (SA) is to evaluate the potential impacts associated with the proposed modified processing and disposition pathway and compare those impacts with those described in the SPA SEIS to determine if the SPA SEIS should be supplemented. Interim Salt Processing followed by High Capacity Salt Processing would result in processing and disposal of actinides in slightly higher concentrations than those evaluated in the SPA SEIS. DOE/EIS-0082-S2-SA-01: Supplement Analysis for Salt Processing Alternatives at the Savannah River Site, Savannah River Operations Office, Aiken, South

404

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement  

Broader source: Energy.gov (indexed) [DOE]

Guidance Supplement 01-01: Nuclear Weapon Program Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues More Documents & Publications Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

405

New Hampshire Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) New Hampshire Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 774 720 582 328 681 509 362 464 492 592 1990's 205 128 96 154 160 90 147 102 103 111 2000's 180 86 66 58 91 84 92 9 0 0 2010's 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas New Hampshire Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

406

DOE Plans Supplemental Environmental Impact Statement for New Petroleum  

Broader source: Energy.gov (indexed) [DOE]

Plans Supplemental Environmental Impact Statement for New Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi DOE Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi March 5, 2008 - 10:52am Addthis Three Public Meetings Planned Next Month; Supplemental Study to Include Floodplain and Wetlands Assessments WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced plans to prepare a Supplemental Environmental Impact Statement (SEIS) for the nation's Strategic Petroleum Reserve (SPR) expansion site in Richton, MS. This supplemental study will consider whether to select a new location for new petroleum reserve's raw water intake structure from the Leaf River to an alternate location with greater water availability. The SEIS will also

407

Connecticut Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Connecticut Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 144 1,584 1,077 291 239 343 298 180 245 251 1990's 111 146 40 94 29 68 48 37 33 31 2000's 20 6 6 57 191 273 91 0 0 1 2010's 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Connecticut Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

408

EIS-0246-SA28: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA28: Supplement Analysis SA28: Supplement Analysis EIS-0246-SA28: Supplement Analysis Wildlife Mitigation Program, Yakima County, Washington BPA proposes to purchase four parcels of private land that total approximately 125 acres located in south-central Washington along the Naches River in Yakima County. Following acquisition, title to the land will be held by The Yakama Nation. The goal of this project is to protect and enhance riparian, wetland, and upland habitats for the benefit of fish and wildlife. DOE/EIS-0246, Bonneville Power Administration and The Yakama Nation, Supplement Analysis for the Wildlife Mitigation Program EIS, Yakima County, Washington (July 2002) More Documents & Publications EIS-0246-SA-29: Supplement Analysis EIS-0246-SA-37: Supplement Analysis EIS-0265-SA-70

409

South Carolina Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) South Carolina Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 74 184 63 73 62 87 31 22 191 201 1990's 17 47 26 34 154 62 178 10 0 18 2000's 63 6 3 15 2 86 75 0 2010's 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas South Carolina Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply &

410

Tennessee Natural Gas Input Supplemental Fuels (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Input Supplemental Fuels (Million Cubic Feet) Input Supplemental Fuels (Million Cubic Feet) Tennessee Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 12 42 90 39 25 36 13 26 36 78 1990's 3 8 12 13 84 33 73 19 4 11 2000's 13 0 1 1 0 0 0 0 0 0 2010's 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 12/12/2013 Next Release Date: 1/7/2014 Referring Pages: Total Supplemental Supply of Natural Gas Tennessee Supplemental Supplies of Natural Gas Supplies of Natural Gas Supplemental Fuels (Annual Supply & Disposition

411

EIS-0075-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0075-SA-02: Supplement Analysis Strategic Petroleum Reserve, New Orleans, Louisiana General site information for all current, existing expansion, and proposed new SPR sites has been derived from the Site Environmental Report or Environmental Impact Statement for expansion and is provided in the subsections below. Facilities have been described along with the applicable NEPA documentation. Site descriptions properly include the discussions of the surrounding environment as well as site location and history. DOE-SPR-EIS-0075-SA-02: Operational and Engineering Modifications and Regulatory Review Supplemental Analysis of Site-Specific and Programmatic Environmental Impact Statements, Strategic Petroleum Reserve, New Orleans, Louisiana (September 2009)

412

EA 1647: Supplemental Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA 1647: Supplemental Environmental Assessment EA 1647: Supplemental Environmental Assessment EA 1647: Supplemental Environmental Assessment Construction and Operation of a Proposed Cellulosic Ethanol Plant, Range Fuels Soperton Plant, LLC (formerly Range Fuels Inc.) Treutlen County, Georgia The Environmental Assessment (EA) analyzes the potential impacts associated with the construction and operation of a proposed cellulosic ethanol plant in Treutlen County, Georgia. Supplemental Environmental Assessment and Notice of Wetlands Involvement Construction and Operation of a Proposed Cellulosic Ethanol Plant, Range Fuels Soperton Plant, LLC (formerly Range Fuels Inc.) Treutlen County, Georgia, DOE/EA 1647 (January 2009) More Documents & Publications EA-1597: Final Environmental Assessment EA-1647: Finding of No Significant Impact

413

EIS-0075-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

075-SA-02: Supplement Analysis 075-SA-02: Supplement Analysis EIS-0075-SA-02: Supplement Analysis Strategic Petroleum Reserve, New Orleans, Louisiana General site information for all current, existing expansion, and proposed new SPR sites has been derived from the Site Environmental Report or Environmental Impact Statement for expansion and is provided in the subsections below. Facilities have been described along with the applicable NEPA documentation. Site descriptions properly include the discussions of the surrounding environment as well as site location and history. DOE-SPR-EIS-0075-SA-02: Operational and Engineering Modifications and Regulatory Review Supplemental Analysis of Site-Specific and Programmatic Environmental Impact Statements, Strategic Petroleum Reserve, New Orleans,

414

EIS-0403-S1: Supplement to the Draft Programmatic Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE...

415

EA-1611-S1: Final Supplemental Environmental Assessment | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Environmental Assessment EA-1611-S1: Final Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power...

416

Enforcement Guidance Supplement 01-01: Nuclear Weapon Program...  

Broader source: Energy.gov (indexed) [DOE]

This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues. Enforcement Guidance Supplement 01-01:...

417

EIS-0265-SA-163: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program, which includes projects to improve watershed conditions, resulting in improved fish and wildlife habitat. DOEEIS-0265-SA-163: Supplement Analysis for the Watershed...

418

EIS-0265-SA-91: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis EIS-0265-SA-91: Supplement Analysis Watershed Management Program - Hood River Fish Habitat (Evans Creek Culvert Replacement) Bonneville Power Administration and the...

419

Enforcement Guidance Supplement 00-02: Price-Anderson Amendment...  

Broader source: Energy.gov (indexed) [DOE]

of program implementation lessons-learned Enforcement Guidance Supplement 00-02: Price-Anderson Amendment Act (PAAA) Program Reviews More Documents & Publications...

420

EIS-0170-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis EIS-0170-SA-01: Supplement Analysis System Operation Review EIS, Bonneville Power Administration, and B.C. Hydro and Power Authority, British Columbia, Canada...

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EIS-0250-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Geologic Repository for the Disposal of Spent Nuclear and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada This Supplement Analysis examines the potential...

422

EIS-0285-SA-06: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation (April 2001) Supplement Analysis for...

423

EIS-0169-SA-05: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

modified to include a hatchery control line, maintained entirely by spawning hatchery-origin fish. DOEEIS-0169-SA-05, Supplement Analysis for YakimaKlickitat Fisheries Project,...

424

EIS-0217: Supplemental Record of Decision | Department of Energy  

Energy Savers [EERE]

to further implement the Moderate Treatment Configuration Alternative for mixed low-level radioactive waste and transuranic waste. Supplemental Record of Decision; Savannah River...

425

EIS-0285-SA-65: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management along the Raymond - Cosmopolis Transmission Line would include danger tree removal within some areas adjacent to the right-of-way (ROW) (May 2002) Supplement...

426

EIS-0285-SA-61: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vegetation Management along the Bell-Boundary No.3, 844 to 961 Transmission Line ROW. (April 2002) (DOEEIS-0285SA-61) Supplement Analysis for the Transmission System...

427

Declaration of Charles Wodrich in Support of Supplemental Comments...  

Broader source: Energy.gov (indexed) [DOE]

of Supplemental Comments of the Plumbing Manufacturers Institute Regarding the Economic Impacts of the Proposed Definition of "Showerhead," Docket No. EERE-2010-BT-NOA-0016...

428

DOE Supplemental Instructions for OMB Section 1512 Reporting...  

Energy Savers [EERE]

Section 1512 Reporting - For Grant and Loan Recipients More Documents & Publications DOE Supplemental Instructions for OMB Section 1512 Reporting - For Contractors Slide 1 Slide 1...

429

,"New York Natural Gas Input Supplemental Fuels (MMcf)"  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Natural Gas Input Supplemental Fuels (MMcf)",1,"Annual",2013 ,"Release Date:","1031...

430

EIS-0200-SA-03: Supplement Analysis | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Laboratory, Carlsbad Field Office (February 2008) More Documents & Publications EIS-0026-S2: Final Supplemental Environmental Impact Statement EIS-0200: Amendment to the...

431

EIS-0218-SA-01: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

Analysis EIS-0218-SA-01: Supplement Analysis Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program The objective of this analysis was to determine whether...

432

EIS-0350-S1: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

Final Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

433

EA-1282-SA-03: Supplement Analysis | Department of Energy  

Energy Savers [EERE]

In March 2002 BPA categorically excluded dredging behind Dam 5 at the Leavenworth Fish Hatchery in connection with the project Memorandum, Supplement Analysis for the...

434

EIS-0317-S1: Draft Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power Administration is proposing to build a new...

435

EIS-0317-S1: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power Administration is proposing to build a new...

436

EIS-0399-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project Proposed Action: Modification to relocate four segments of the...

437

EIS-0285-SA-132: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Vegetation Management for portion of the Big Eddy - Ostrander 1 500 kV transmission line located from tower structure 312 to 393 Supplement Analysis for the...

438

Microsoft Word - Gasoline_2008 Supplement.doc  

Gasoline and Diesel Fuel Update (EIA)

8 8 1 April 2008 Short-Term Energy Outlook Supplement: Motor Gasoline Consumption 2008 A Historical Perspective and Short-Term Projections 1 Highlights * Income growth rates have less of an impact on recent trends in gasoline consumption than in the past, but short-run effects are still significant. * High gasoline prices are once again motivating drivers to conserve by driving less and purchasing more fuel-efficient transportation. * The increasing share of lower-Btu-content ethanol has contributed to a growing divergence between volume-based and energy-content-based measures of trends in gasoline consumption. * Consumer sensitivity to gasoline price changes increases during periods when

439

ORISE: Human Subjects Protection Resource Protection Book  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Human Subjects Protection Resource Book Human Subjects Protection Resource Book The Human Subjects Protection Resource Book synthesizes information currently available on the protection of human subjects in research, the continuing application of such information to new areas of endeavor, and ever-changing rules, regulations, and guidance. This resource, to which the Oak Ridge Institute for Science and Education (ORISE) contributed, is for investigators, institutional review boards, research organizations, research subjects and others. The book contains chapters that provide background information on the history and development of federal regulations; chapters that discuss procedural and substantive issues regarding the review and conduct of human subjects research; and chapters that are specific to one type of research

440

Operator valued Hardy spaces and related subjects  

E-Print Network [OSTI]

OPERATOR VALUED HARDY SPACES AND RELATED SUBJECTS A Dissertation by TAO MEI Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY August 2006 Major... by: Chair of Committee, Gilles Pisier Committee Members, William Johnson Roger Smith Daren Cline Head of Department, Al Boggess August 2006 Major Subject: Mathematics iii ABSTRACT Operator Valued Hardy Spaces and Related Subjects. (August 2006) Tao...

Mei, Tao

2006-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Ferrocyanide tank waste stability. Supplement 2  

SciTech Connect (OSTI)

Ferrocyanide wastes were generated at the Hanford Site during the mid to late 1950s as a result of efforts to create more tank space for the storage of high-level nuclear waste. The ferrocyanide process was developed to remove {sup 137}CS from existing waste and newly generated waste that resulted from the recovery of valuable uranium in Hanford Site waste tanks. During the course of research associated with the ferrocyanide process, it was recognized that ferrocyanide materials, when mixed with sodium nitrate and/or sodium nitrite, were capable of violent exothermic reaction. This chemical reactivity became an issue in the 1980s, when safety issues associated with the storage of ferrocyanide wastes in Hanford Site tanks became prominent. These safety issues heightened in the late 1980s and led to the current scrutiny of the safety issues associated with these wastes, as well as current research and waste management programs. Testing to provide information on the nature of possible tank reactions is ongoing. This document supplements the information presented in Summary of Single-Shell Tank Waste Stability, WHC-EP-0347, March 1991 (Borsheim and Kirch 1991), which evaluated several issues. This supplement only considers information particular to ferrocyanide wastes.

Fowler, K.D.

1993-01-01T23:59:59.000Z

442

Idaho Supplementation Studies : 1994 Annual Report.  

SciTech Connect (OSTI)

This work was the result of a program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric power plants on the Columbia River. Adult and jack chinook salmon escapement were indexed by redd counts and weir returns. Escapement in 1994 was low and in some cases approached the lowest on record. Although stream flow conditions and parr abundance were conducive to precise parr population estimates, some streams continued to exhibit wide confidence intervals. Different methods used to calculate the estimates yielded inconsistent results with regard to increasing or decreasing the population estimate and improving the precision of the estimates. No single method appeared definitively better for all streams. Emigrant traps captured 78,138 chinook salmon fry, parr, and smolts in 1994. Application of a weekly trap efficiency adjusted for stream flow produced emigration estimates that were up to 30% larger than when a seasonal trap efficiency was used. Detection rates for smolts tagged in some streams were similar to detection rates for parr tagged during the fall of the previous year. This was unexpected because overwinter mortality usually results in a lower detection rate for fall-tagged fish. Low escapement in 1994 severely hampered Idaho Supplementation Studies (ISS) broodstock development. The inability to develop local broodstocks for supplementation is the most important factor threatening the implementation of the ISS.

Nemeth, Doug; Plaster, Kurtis; Apperson, Kimberly A.

1996-11-01T23:59:59.000Z

443

Policy Title: Human Subject Responsible Office: UFS  

E-Print Network [OSTI]

Policy Title: Human Subject Payments Responsible Office: UFS HARVARD UNIVERSITY FINANCIAL POLICY Effective Date: 1/1/11 Revision Date: N/A HUMAN SUBJECT PAYMENTS Policy Number TAX102 HARVARD UNIVERSITY FINANCIAL POLICY POLICY STATEMENT Individuals conducting Harvard research studies that compensate human

Chen, Yiling

444

Biomedical Monitoring of Non-Hospitalized Subjects  

E-Print Network [OSTI]

Biomedical Monitoring of Non-Hospitalized Subjects using Disruption-Tolerant Wireless Sensors for the collection of biomedical data produced by sensors carried by mobile non-hospitalized subjects. In this paper we investigate the possibility of using these many hotspots as gateways for biomedical data

Paris-Sud XI, Université de

445

EIS-0203-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

03-SA-01: Supplement Analysis 03-SA-01: Supplement Analysis EIS-0203-SA-01: Supplement Analysis INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management This Supplement Analysis used four primary methods for determining whether the 1995 EIS remains adequate. 1) Review of all NEPA documentation prepared in the last five years to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. 2) Examination of INEEL operations program by program to determine what changes had taken place and whether they were within the analyzed scope of the 1995 EIS. 3) Review of changes, if any, in each environmental discipline that was analyzed in the 1995 EIS.

446

EIS-0218-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

218-SA-03: Supplement Analysis 218-SA-03: Supplement Analysis EIS-0218-SA-03: Supplement Analysis Foreign Research Reactor Spent Nuclear Fuel Acceptance Program The objective of this analysis is to determine whether a supplement to the FRR SNF EIS is needed. Under the initial Record of Decision (ROD) signed May 13, 1996 and published in the Federal Register on May 17, 1996 (61 FR 25092), only spent fuel of U.S. origin that is irradiated and discharged from foreign research reactors in the eligible nations before May 13, 2006, can be accepted. Eligible spent fuel can be accepted through May 12, 2009. This Supplement Analysis evaluates a proposal to extend the expiration date for irradiation and return of a limited amount of FRR SNF (not to exceed the originally eligible 20 MTHM), and to include SNF from the Replacement

447

EIS-0218-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0218-SA-03: Supplement Analysis Foreign Research Reactor Spent Nuclear Fuel Acceptance Program The objective of this analysis is to determine whether a supplement to the FRR SNF EIS is needed. Under the initial Record of Decision (ROD) signed May 13, 1996 and published in the Federal Register on May 17, 1996 (61 FR 25092), only spent fuel of U.S. origin that is irradiated and discharged from foreign research reactors in the eligible nations before May 13, 2006, can be accepted. Eligible spent fuel can be accepted through May 12, 2009. This Supplement Analysis evaluates a proposal to extend the expiration date for irradiation and return of a limited amount of FRR SNF (not to exceed the originally eligible 20 MTHM), and to include SNF from the Replacement

448

EIS-0218-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0218-SA-04: Supplement Analysis U.S. Disposition of Gap Material--Spent Nuclear Fuel NNSA proposes expansion of current efforts under the GTRI FRR SNF Acceptance Program to allow limited quantities of SNF containing U.S.- and non-U.S.-origin HEU to be recovered from foreign countries and managed at DOE sites in the United States. This SA addresses the environmental impacts associated with the transport of this Gap Material SNF to and within the United States and its subsequent disposition. DOE/EIS-0218-SA-4: DOE, National Nuclear Security Administration, Supplement Analysis for the U.S. Disposition of Gap Material--Spent Nuclear Fuel (January 2009) More Documents & Publications EIS-0218: Revised Record of Decision EIS-0218-SA-03: Supplement Analysis

449

Supplemental Comments of the Plumbing Manufacturers Instititute Regarding  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Comments of the Plumbing Manufacturers Instititute Supplemental Comments of the Plumbing Manufacturers Instititute Regarding the Economic Impacts of the Proposed Definition of "Showerhead," Docket No. EERE-2010-BT-NOA-0016 Supplemental Comments of the Plumbing Manufacturers Instititute Regarding the Economic Impacts of the Proposed Definition of "Showerhead," Docket No. EERE-2010-BT-NOA-0016 Supplemental Comments of the Plumbing Manufacturers Instititute Regarding the Economic Impacts of the Proposed Definition of "Showerhead," Docket No. EERE-2010-BT-NOA-0016. The Plumbing Manufacturers Institute submits supplemental comments regarding the definition of showerheads in interpetive rule 10 C.F.R. Section 430.2. Comment alleges that the interpretive rule violates the APA and the EPA, but focuses on the economic impact of the rule, claiming that

450

EA-1758: Supplement to the Cumulative Impact Analysis | Department of  

Broader source: Energy.gov (indexed) [DOE]

EA-1758: Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon This document presents information supplemental to the Environmental Assessment (EA), Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon (DOE/EA-1758) prepared by the Bureau of Land Management (BLM). This document addresses potential impacts associated with other proposed future geothermal projects in the area of the Newberry National Volcanic Monument that may be cumulative with those described in the EA. Supplement to the Cumulative Impact Analysis of Drilling, Testing, and

451

EIS-0348-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0348-SA-01: Supplement Analysis Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Attribution Program and Forensic Science Center's Analyses Programs Supplemental Analysis for the Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Atribution Program and Forensic Science Center's Analyses Programs at the Livermore Site. EIS-0348-SA-01; Supplemental Analysis for the Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Atribution Program and Forensic Science Center's Analyses Programs at the Livermore Site (February 2006)

452

EA-0307-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7-SA-01: Supplement Analysis 7-SA-01: Supplement Analysis EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis The Bonneville Power Administration prepared an Environmental Assessment (EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a resident trout hatchery on the Colville Indian Reservation to partially mitigate for anadromours and other fish losses resulting from the the construction and operation of the Chief Joseph Dam and Grand Coulee Dam hydroelectric projects. Colville Resident Trout Hatchery Project Supplement Analysis

453

EIS-0026-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0026-SA-03: Supplement Analysis Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tones (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (November 2002)) More Documents & Publications EIS-0026-SA-02: Supplement Analysis

454

EIS-0285-SA-448: Supplement Analysis | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-448: Supplement Analysis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-448) Pearl-Marion No. 1 Transmission Line Corridor) Project No. PP&A # 2049 Vegetation management along the Pearl-Marion #1 500-kV transmission line corridor rights-of-way (ROW) from Pearl Substation to Marion Substation. The corridor includes 4.5 miles of the Ostrander-Pearl #1 and 3 miles of the Big Eddy-Chemawa #1 tranmission line ROW. The corridor ranges from 150 to 562 feet in width and traverses approximately 44 miles of terrain. EIS-0285-SA-448.pdf More Documents & Publications CX-007986: Categorical Exclusion Determination EIS-0285-SA-25: Supplement Analysis CX-008879: Categorical Exclusion Determination

455

EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Intent to Prepare Supplemental Draft Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND To address an increase in the electric load forecast for western North Dakota, the USDA Rural Utilities Service issued a notice of intent to prepare a supplement to its December 2012 Draft EIS. The supplement will analyze a new alternative for a proposed transmission line from Antelope Valley to Neset, North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to

456

EIS-0407-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

07-SA-01: Supplement Analysis 07-SA-01: Supplement Analysis EIS-0407-SA-01: Supplement Analysis Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas This EIS analyzed the potential direct, indirect, and cumulative environmental impacts of the design, construction, and startup of a biomass-to-ethanol and energy production facility--the Biorefinery Project. The Supplement Analysis examines the potential environmental impacts of the Modified Proposed Action and addresses whether the potential environmental impacts are within the range of the potential environmental impacts analyzed in the FEIS. Supplement Analysis for the Final environmental Impact Statement for the Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas (EIS-0407-SA-1) (July 2011)

457

EIS-0309-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

09-SA-02: Supplement Analysis 09-SA-02: Supplement Analysis EIS-0309-SA-02: Supplement Analysis Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States The United States (U.S.) Department of Energy (DOE) National Nuclear Security Administration (NNSA) has prepared this Supplement Analysis (SA) for the air and ocean transport of enriched uranium between foreign nations and the United States pursuant to the National Environmental Policy Act (NEPA). It evaluates the environmental impacts associated with transport of enriched uranium from foreign countries to the NNSA Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee (the Proposed Action). Supplement Analysis for the Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States (August 2006)

458

EIS-0075-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0075-SA-01: Supplement Analysis Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation, Strategic Petroleum Reserve, New Orleans, Louisiana The purpose of this analysis is threefold: to document changes of National Environmental Policy Act (NEPA) significance to the SPR and to document the changes to environmental laws, regulations, and orders since the original and supplemental Environmental Impact Statements (EIS) documents listed below were prepared, to analyze the impacts of these changes to the original Record(s) Of Decision(s) (RODs) and to detail any recommended additional NEPA actions, if needed. DOE/SPR/EIS-0075-SA-01, Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering

459

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Draft Supplemental Environmental Assessment 3: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

460

EIS-0281-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0281-SA-02: Supplement Analysis Sandia National Laboratories/New Mexico Isentropic Compression and Flyer Plate Experiments Involving Plutonium at the Z and Saturn Accelerators This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS), DOE/EIS-0281, adequately addresses the environmental effects of a proposal to conduct isentropic compression and flyer plate experiments involving plutonium at the Z and Saturn Accelerators, or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplement Analysis for Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico Isentropic Compression and Flyer Plate

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

EIS-0157-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0157-SA-01: Supplement Analysis EIS-0157-SA-01: Supplement Analysis EIS-0157-SA-01: Supplement Analysis Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore, Oakland Operations Office, Oakland, California Volume I: Main Report This supplement analysis (SA) was prepared in accordance with the requirements of the National Environmental Policy Act of 1969 (NEPA). It considers whether the Final Environmental Impact Statement and Environmental Impact Report for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore (DOE 1992), hereafter referred to as the "1992 EIS/EIR," should be supplemented, a new environmental impact statement (EIS) should be prepared, or no further NEPA documentation is required. The main body of this SA focuses on the

462

EA-1758: Supplement to the Cumulative Impact Analysis | Department of  

Broader source: Energy.gov (indexed) [DOE]

: Supplement to the Cumulative Impact Analysis : Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon This document presents information supplemental to the Environmental Assessment (EA), Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon (DOE/EA-1758) prepared by the Bureau of Land Management (BLM). This document addresses potential impacts associated with other proposed future geothermal projects in the area of the Newberry National Volcanic Monument that may be cumulative with those described in the EA. Supplement to the Cumulative Impact Analysis of Drilling, Testing, and

463

EA-1887: Supplemental Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplemental Environmental Assessment 7: Supplemental Environmental Assessment EA-1887: Supplemental Environmental Assessment Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory, Golden, Colorado (DOE/EA-1573-S1) This Supplemental EA evaluates the environmental impacts of a proposal to make improvements to the Renewable Fuel Heat Plant including construction and operation of a wood chip storage silo and the associated material handling conveyances and utilization of regional wood sources. EA-1573-SEA-2012.pdf More Documents & Publications EA-1573-S1: Proposed Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO EA-1573: Final Environmental Assessment EA-1573-S1: Notice of Availability of a Draft Supplemental Environmental

464

EIS-0359-SA-01: Draft Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

59-SA-01: Draft Supplement Analysis 59-SA-01: Draft Supplement Analysis EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. This document includes EIS-0360-SA-01.

465

EIS-0075-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

075-SA-01: Supplement Analysis 075-SA-01: Supplement Analysis EIS-0075-SA-01: Supplement Analysis Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation, Strategic Petroleum Reserve, New Orleans, Louisiana The purpose of this analysis is threefold: to document changes of National Environmental Policy Act (NEPA) significance to the SPR and to document the changes to environmental laws, regulations, and orders since the original and supplemental Environmental Impact Statements (EIS) documents listed below were prepared, to analyze the impacts of these changes to the original Record(s) Of Decision(s) (RODs) and to detail any recommended additional NEPA actions, if needed. DOE/SPR/EIS-0075-SA-01, Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering

466

EIS-0360-SA-01: Draft Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Draft Supplement Analysis -SA-01: Draft Supplement Analysis EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. EIS-0359-SA-01_EIS-0360-SA-01-2007.pdf

467

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

468

Supplemental Guidance Regarding Compensatory Time Off for Travel |  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Guidance Regarding Compensatory Time Off for Travel Supplemental Guidance Regarding Compensatory Time Off for Travel Supplemental Guidance Regarding Compensatory Time Off for Travel Questions and answers on issues that supplement the final regulations on compensatory time for travel issued by the Office of Personnel Management. In addition, a sample worksheet is attached to assist travelers in determining and documenting their travel time that may be credited for compensatory time for travel. This information will be incorporated in Appendix D of the DOE Handbook on Overtime when the handbook is updated. Supplemental Guidance Regarding Compensatory Time Off for Travel Responsible Contacts Bruce Murray HR Policy Advisor E-mail bruce.murray@hq.doe.gov Phone 202-586-3372 More Documents & Publications DOE Handbook on Overtime

469

EIS-0203-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0203-SA-01: Supplement Analysis INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management This Supplement Analysis used four primary methods for determining whether the 1995 EIS remains adequate. 1) Review of all NEPA documentation prepared in the last five years to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. 2) Examination of INEEL operations program by program to determine what changes had taken place and whether they were within the analyzed scope of the 1995 EIS. 3) Review of changes, if any, in each environmental discipline that was analyzed in the 1995 EIS.

470

EIS-0240-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0-SA-01: Supplement Analysis 0-SA-01: Supplement Analysis EIS-0240-SA-01: Supplement Analysis Disposition of Surplus Highly Enriched Uranium This supplement analysis (SA) summarizes the status of HEU disposition activities conducted to date and evaluates the potential impacts of continued program implementation. In addition, this SA considers the potential environmental impacts of proposed new DOE/NNSA initiatives to support the surplus HEU disposition program. Specifically, DOE/NNSA is proposing new end-users for existing program material, new disposal pathways for existing program HEU discard material, and down-blending additional quantities of HEU. DOE/EIS-0240, Supplement Analysis for the Disposition of Surplus Highly Enriched Uranium (October 2007) More Documents & Publications

471

EIS-0287-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0287-SA-01: Supplement Analysis Idaho High-Level Waste and Facilities Disposition DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005). In October 2002, DOE issued the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement that provided an analysis of the potential environmental consequences of alternatives/options for the management and disposition of Sodium Bearing Waste (SBW), High-Level Waste (HLW) calcine, and HLW facilities at the Idaho Nuclear Technology and Engineering Center. DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005)

472

EIS-0285-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-02: Supplement Analysis 85-SA-02: Supplement Analysis EIS-0285-SA-02: Supplement Analysis Transmission System Vegetation Management Program Bonneville Power Administration (BPA) proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attachment. BPA is clearing the danger trees to prevent them from falling or growing into the lines causing outages. Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS(DOE/EIS-0285/SA-02) (March 2001) More Documents & Publications EIS-0285-SA-64: Supplement Analysis CX-010347: Categorical Exclusion Determination

473

EIS-0218-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0218-SA-02: Supplement Analysis EIS-0218-SA-02: Supplement Analysis EIS-0218-SA-02: Supplement Analysis Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program The objective of this analysis was to determine whether a supplement to the orginal FRR SNF EIS was needed. The orginal EIS broadly evaluated the transport by ship of spent nuclear fuel from CNWS to INEEL. This Supplement Analysis examined the potential impacts of accepting foreign research reactor spent nuclear fuel from 41 eligible countries under three scenarios not specifically examined in the orginal EIS. These three scenarios were: (1) accepting FRR SNF that would have been eligible for receipt under criteria set forth in the EIS, but which was not included in the estimated spent fuel inventories for purposes of

474

EIS-0265-SA-75: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0265-SA-75: Supplement Analysis EIS-0265-SA-75: Supplement Analysis EIS-0265-SA-75: Supplement Analysis Watershed Management Program - Gourlay Creek Fish Ladder Project Bonneville Power Administration proposes to fund the construction of a fish passage facility at the Gourlay Creek Dam/water reservoir in Columbia County, Oregon. The City of Scappoose owns and manages close to half of the Gourlay Creek Watershed including high quality habitat above and below the Gourlay Creek Dam. Gourlay Creek Dam has been identified as a key limiting factor in the re-generation of salmon and trout in the Gourlay Creek Watershed. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-75) - Gourlay Creek Fish Ladder Project (February 2002) More Documents & Publications EIS-0265-SA-59: Supplement Analysis

475

EIS-0281-SA-01: Supplemental Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81-SA-01: Supplemental Analysis 81-SA-01: Supplemental Analysis EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS) adequately addresses the environmental effects of a proposal for reestablishing long-term pulse mode testing at the Annular Core Research Reactor (ACRR) or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplemental Analysis: Site-Wide Environmental Impact Statement For Sandia National Laboratories/New Mexico Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National

476

EIS-0225-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5-SA-04: Supplement Analysis 5-SA-04: Supplement Analysis EIS-0225-SA-04: Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components This second 5-Year update SA fulfills DOE's requirement to review the SWEIS at least every 5 years as required by 10 CFR 1021.330(d). This SA accomplishes that requirement by comparing the information presented in the SWEIS with changes and proposed changes, through 2011, in the environment and Pantex Plant missions, activities, programs, and impacts. DOE/EIS-0225-SA-04: Supplement Analysis for the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components (October 2008) More Documents & Publications EIS-0225-SA-05: Supplement Analysis

477

EIS-0265-SA-99: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis 9: Supplement Analysis EIS-0265-SA-99: Supplement Analysis Watershed Management Program The overall objective of the project is to restore as much as possible, the natural character and function of the Longley Meadows wetland complex. This project is a joint partnership among the CTUIR, Grand Rhonda Model Watershed Program, Oregon Department of Fish and Wildlife, Natural Resource Conservation Service, U.S. Department of Agriculture, and BPA. This project involves several separate components that are part of a regionwide effort to protect and restore anadromous fish habitat in the Grand Ronde Basin Supplement Analysis for the Watershed Management Program Environmental Impact Statement (November 2002), DOE/EIS-0265-SA-99 More Documents & Publications EA-1173-SA-01: Supplement Analysis

478

EIS-0310-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0-SA-02: Supplement Analysis 0-SA-02: Supplement Analysis EIS-0310-SA-02: Supplement Analysis Nuclear Infrastructure Programmatic Environmental Impact Statement Supplement Analysis Determination for Plutonium-238 Production for Radioisotope Power Systems DOE prepared this SA to evaluate the potential environmental impacts associated with its determination that the 2001 ROD offers the optimum approach for production of Pu-238. The SA helped to determine if there are significant new circumstances or information relevant to environmental concerns which would warrant preparation of a supplement to the NI PEIS or a new EIS, or that the 2001 decision can be implemented without any further NEPA review. DOE completed the SA in September 2013 and has made the determination that there are no substantial changes to the original

479

EIS-0281-SA-01: Supplemental Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplemental Analysis -SA-01: Supplemental Analysis EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS) adequately addresses the environmental effects of a proposal for reestablishing long-term pulse mode testing at the Annular Core Research Reactor (ACRR) or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplemental Analysis: Site-Wide Environmental Impact Statement For Sandia National Laboratories/New Mexico Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National

480

EIS-0309-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

309-SA-02: Supplement Analysis 309-SA-02: Supplement Analysis EIS-0309-SA-02: Supplement Analysis Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States The United States (U.S.) Department of Energy (DOE) National Nuclear Security Administration (NNSA) has prepared this Supplement Analysis (SA) for the air and ocean transport of enriched uranium between foreign nations and the United States pursuant to the National Environmental Policy Act (NEPA). It evaluates the environmental impacts associated with transport of enriched uranium from foreign countries to the NNSA Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee (the Proposed Action). Supplement Analysis for the Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States (August 2006)

Note: This page contains sample records for the topic "kep-4 subject supplement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EIS-0310-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0310-SA-01: Supplement Analysis Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States Supplement Analysis for the Programmatic Environmental Impact Statement (PEIS) for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States. The Department of Energy (DOE), pursuant to the National Environmental Policy Act (NEPA), issued the Final PEIS for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (Nuclear Infrastructure (NI) PEIS, DOE/EIS-0310) in December 2000. Supplement Analysis for the Programmatic Environmental Impact Statement

482

EIS-0247-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0247-SA-01: Supplement Analysis EIS-0247-SA-01: Supplement Analysis EIS-0247-SA-01: Supplement Analysis Proposed Superconducting Linear Accelerator at the Spallation Neutron Source, Oak Ridge, Tennessee A superconducting linear accelerator (linac) is proposed as a replacement for a portion of the ambient-temperature linac currently in the Project Baseline. This Supplement Analysis is conducted to evaluate the environmental impacts associated with the proposed modification in comparison with the environmental impacts analyzed in the SNS Final Environmental Impact Statemetn (FEIS). DOE/EIS-0247, Department of Energy, Oak Ridge Operations, Supplement Analysis of the Proposed Superconducting Linear Accelerator at the Spallation Neutron Source, Oak Ridge, Tennessee (February 2000) More Documents & Publications

483

EA-1758-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EA-1758-SA-01: Supplement Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon DOE is aware of other geothermal actions being pursued in the same general area as those described in the EA. DOE is considering providing financial assistance to partially fund two other projects in the project vicinity for the purpose of promoting renewable energy exploration for geothermal reasons. Supplement to the Cumulative Impact Analysis of : Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon, DOE/EA-1758 (July 20, 2010) More Documents & Publications EA-1758: Supplement to the Cumulative Impact

484

EIS-0195-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-02: Supplement Analysis -SA-02: Supplement Analysis EIS-0195-SA-02: Supplement Analysis Proposed Silo 3 Alternatives at the FEMP Approval of NEPA Supplemental Analysis for Proposed Silo 3 Alternatives at the FEMP. Final Explanation of Significant Differences for Operable Unit 4 Silo 3 Remedial Action at the Fernald Environmental Management Project, Fernald, Ohio. A Record of Decision for Operable Unit $ (OU4) was signed on December 7, 1994 identifying on-site vitrification and off-site disposal at the U.S. DOE Nevada Test Site (NTS) as the selected remedy for remediation of the silo materials. DOE/EIS-0195-SA-02, Department of Energy, Ohio Field Office, Approval of NEPA Supplemental Analysis for Proposed Silo 3 Alternatives at the FEMP (August 1996), (March 1998) More Documents & Publications

485

EIS-0423-S1: Notice of Intent to Prepare a Supplemental Environmental...  

Office of Environmental Management (EM)

to Prepare a Supplemental Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury DOE announces it intent to prepare a supplement to the January...

486

EIS-0288-S1: EPA Notice of Availability of Draft Supplemental...  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of Draft Supplemental Environmental Impact Statement EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement...

487

EIS-0423-S1: EPA Notice of Availability of Final Supplemental...  

Energy Savers [EERE]

23-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement...

488

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...  

Energy Savers [EERE]

EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

489

EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental...  

Energy Savers [EERE]

33-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact...

490

EIS-0236-S4: DOE Notice of Availability of the Supplemental Programmat...  

Energy Savers [EERE]

EIS-0236-S4: DOE Notice of Availability of the Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: DOE Notice of Availability of the Supplemental Programmatic...

491

EIS-0288-S1: Notice of Intent to Prepare a Supplemental Environmental...  

Energy Savers [EERE]

Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0288-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement Production of...

492

EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...  

Energy Savers [EERE]

288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...

493

EIS-0423-S1: EPA Notice of Availability of Final Supplemental...  

Office of Environmental Management (EM)

Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement Long-Term Management and Storage of...

494

EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental...  

Energy Savers [EERE]

283-S2: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental Environmental Impact...

495

EIS-0236: Notice of Intent to Prepare a Supplement to the Programmatic...  

Energy Savers [EERE]

: Notice of Intent to Prepare a Supplement to the Programmatic Environmental Impact Statement EIS-0236: Notice of Intent to Prepare a Supplement to the Programmatic Environmental...

496

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...  

Energy Savers [EERE]

DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement...

497

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) (5/20/02)  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) Joe DeHerrera Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Eisminger/ CREP Dike Relocation Project No: 1992-026-01 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 2.1 Maintain Healthy Riparian Plant Communities, 2.3 Creation of Wetlands to Provide Near Channel Habitat and Store Water for Land Use, 2.7 Avoid Exotic Species, 2.4 Provide Filter Strips to Catch Sediment and Other Pollutants, 6.1 Deferred Grazing. Location: Union County, Oregon

498

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) (10/4/01)  

Broader source: Energy.gov (indexed) [DOE]

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) Jay Marcotte Fish and Wildlife Project Manager Proposed Action: Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin. Project No: 2001-039-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Various Walla Walla River Basin Irrigation Diversions, Washington Proposed by: Bonneville Power Administration (BPA), the Walla Walla County Conservation District. Description of the Proposed Action: BPA is proposing to provide cost share for a program that

499

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) (10/29/01)  

Broader source: Energy.gov (indexed) [DOE]

29, 2001 29, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) Alan Ruger Fish and Wildlife Project Manager Proposed Action: Duncan Creek Channel Rehabilitation Project Project No: 2001-053-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.11 Remove Debris Functioning as Barrier to Passage, 1.16 Spawning Habitat Enhancements, 2.1 Maintain Healthy Riparian Plant Communities, 2.9 Mechanical Vegetation Control. Location: Skamania County, Washington. Proposed by: Bonneville Power Administration (BPA), and the Washington State Department of Fish and Wildlife (WDFW)

500

(DOE/EIS-0265/SA-102): Supplement Analysis for the Watershed Management Program EIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-102) David Byrnes, KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Tributary Access and Habitat Program - Ellensburg Water Company/ Cooke Creek Diversion Project Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.5 Install Grade Control Structures and Check Dams; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.15 Fish Passage Enhancement - Fishways; 2.1 Maintain Healthy Riparian Plant Communities; 4.10 Water Conveyance - Pipeline; 4.20 Water