Powered by Deep Web Technologies
Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - New Cingular Wireless Environmental Clearance Memorandum.doc  

Broader source: Energy.gov (indexed) [DOE]

September 19, 2011 September 19, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Christine Kimball Realty Specialist - TERR-3 Proposed Action: Grant New Cingular Wireless' request for use of right-of-way at the Salem Substation. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Grant or denial of requests for multiple-use of a transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines and drainage culverts. Location: Polk County Salem Substation, 2815 Salem Dallas Highway NW, Salem,Oregon; Township 7S, Range 3W, Section 29. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to grant a request submitted by New

2

DOE/EIS-0378-SA-01: Supplement Analysis for the Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement (DOE/EIS-0378-SA-01) (02/05/08)  

Broader source: Energy.gov (indexed) [DOE]

February 5, 2008 February 5, 2008 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Port Angeles-Juan de Fuca Transmssion Project Final Environmental Impact Statement (DOE/EIS-0378/SA-01) Mark Korsness Project Manager - TEP TPP-3 Proposed Action: Relocation of the marine exit hole for the horizontal directionally drilled (HDD) hole that would be drilled under the Proposed Action. Proposed by: Sea Breeze Olympic Converter LP (Sea Breeze). Location: Port Angeles Harbor near Port Angeles, Washington. Background: As part of its proposed international transmission cable analyzed in the Port Angeles-Juan de Fuca Transmssion Project EIS, Sea Breeze has proposed the drilling of a HDD hole to transition the cable from the sea bed of the Strait of Juan de Fuca to land. The HDD hole

3

Collection Policy: DESIGN & ENVIRONMENTAL ANALYSIS Subject Scope | Priority Tables | Other policies . . .  

E-Print Network [OSTI]

and in architecture, landscape architecture, environmental psychology, business and city and regional planningCollection Policy: DESIGN & ENVIRONMENTAL ANALYSIS Subject Scope | Priority Tables | Other policies The Department of Design and Environmental Analysis is concerned with the planning design and management

Angenent, Lars T.

4

Photon Sciences Subject: Photon Sciences Significant Environmental Aspects Matrix  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Subject: Photon Sciences Significant Environmental Aspects Matrix Doument Number: PS-C-ESH-PRC-023 Revision 2 Effective: Page 1 of 2 Approved: Andrew Ackerman Approval Signature on file with master copy. Environmental Aspects 5/10/13 ACTIVITY DESCRIPTION R e g u la te d In d u s tr ia l W a s te H a z a rd o u s W a s te R a d io a c ti v e W a s te M ix e d W a s te R e g u la te d M e d ic a l W a s te W o r k w it h E n g in e e re d N a n o m a te ri a ls A tm o s p h e r ic D is c h a rg e s L iq u id D is c h a r g e s C h e m ic a l ( C ) S to ra g e /U s e o r R a d io a c ti v e M a te ri a l ( R ) W a te r C o n s u m p ti o n P o w e r C o n s u m p ti o n E n g in e e re d N a n o m a te r ia ls H is to r ic a l M o n u m e n ts / C u lt u r a l R e s o u rc e s S e n s it iv e /E n d a n g e r e d S p e c ie s a n d S e n s it iv e H a b it a ts E n v . N o is e H is to r ic a l C o n ta m in a ti o n S o il A c ti v a ti o n Comments Title Number C R PS Experimental Program Experimental Program B725 SAFs a a a a b* f x x x a B725 *HEPA used for nano particulate work

5

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

Management and Restoration Technologies Management and Restoration Technologies Go to Research Groups Preprints Provided by Individual Scientists: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Achenbach, Laurie A. (Laurie A. Achenbach) - Department of Microbiology, Southern Illinois University Alvarez, Pedro J. (Pedro J. Alvarez) - Department of Civil and Environmental Engineering, Rice University Alvarez-Cohen, Lisa (Lisa Alvarez-Cohen) - Department of Civil and Environmental Engineering, University of California at Berkeley Anderson, Larry G.(Larry G.Anderson).- Department of Chemistry, University of Colorado at Denver Arhonditsis, George B. (George B. Arhonditsis) - Department of Physical and Environmental Sciences, University of Toronto at Scarborough Ashkenazy, Yossi "Yosef" (Yossi "Yosef" Ashkenazy) - Department of

6

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

S S T U V W X Y Z Rahmeyer, William J. (William J. Rahmeyer) - Utah Water Research Laboratory & Department of Civil and Environmental Engineering, Utah State University Ramsay, Juliana (Juliana Ramsay) - Department of Chemical Engineering, Queen's University (Kingston) Reysenbach, Anna-Louise (Anna-Louise Reysenbach) - Department of Biology, Portland State University Ritchie, Ewen (Ewen Ritchie) - Department of Energy Technology, Aalborg University Rood, Stewart (Stewart Rood) - Department of Biological Sciences, University of Lethbridge Rosendahl, Lasse (Lasse Rosendahl) - Department of Energy Technology, Aalborg University Röder, Beate (Beate Röder) - Institut für Physik, Humboldt-Universität zu Berlin Go back to Individual Researchers Collections:

7

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

M N O P Q R S M N O P Q R S T U V W X Y Z Labavitch, John (John Labavitch) - Department of Plant Sciences, University of California, Davis Li, Kewen (Kewen Li) - Geothermal Program, Department of Petroleum Engineering, Stanford University Ling, Peter (Peter Ling) - Department of Food, Agricultural, and Biological Engineering, Ohio State University Lipo, Thomas (Thomas Lipo) - Department of Electrical and Computer Engineering, University of Wisconsin at Madison Logan, Bruce E.(Bruce E.Logan).- Department of Civil and Environmental Engineering, Pennsylvania State University Go back to Individual Researchers Collections: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Leibniz Universität Hannover, Institut für Festkörperphysik, Institut für Solarenergieforschung Hameln

8

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

N O P Q R S N O P Q R S T U V W X Y Z Macdonald, Daniel (Daniel Macdonald) - College of Engineering and Computer Science, Australian National University Macdonald, Ellen (Ellen Macdonald) - Department of Renewable Resources, University of Alberta Mallick, Rajib B. (Rajib B. Mallick) - Department of Civil and Environmental Engineering, Worcester Polytechnic Institute McCready, Mark J. (Mark J. McCready) - Department of Chemical and Biomolecular Engineering, University of Notre Dame Michel Jr., Frederick C. (Frederick C. Michel Jr.) - Department of Food, Agricultural, and Biological Engineering, Ohio State University Mitchell, Paul D. (Paul D. Mitchell) - Department of Agricultural and Applied Economics, University of Wisconsin at Madison Mitchell, Stephen (Stephen Mitchell) - Department of Forest

9

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

B C D E F G H I J K L M N O P Q R S B C D E F G H I J K L M N O P Q R S T U V W X Y Z Bak-Jensen, Birgitte (Birgitte Bak-Jensen) - Department of Energy Technology, Aalborg University Banerjee, Rangan (Rangan Banerjee) - Department of Mechanical Engineering, Indian Institute of Technology Bombay Barlaz, Morton A. (Morton A. Barlaz) - Department of Civil, Construction, and Environmental Engineering, North Carolina State University Basu, Sukanta (Sukanta Basu) - Department of Marine, Earth and Atmospheric Sciences, North Carolina State University Benson, Eric R. (Eric R. Benson) - Department of Bioresources Engineering, University of Delaware Berning, Torsten (Torsten Berning) - Department of Energy Technology, Aalborg University Bialek, Janusz W. (Janusz W. Bialek) - School of Engineering and

10

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

D E F G H I J K L M N O P Q R S D E F G H I J K L M N O P Q R S T U V W X Y Z Cañizares, Claudio A. (Claudio A. Cañizares) - Department of Electrical and Computer Engineering, University of Waterloo Chaudhary, Sanjay (Sanjay Chaudhary) - Department of Energy Technology, Aalborg University Chauhan, Sanjay S. (Sanjay S. Chauhan) - Utah Water Research Laboratory & Department of Civil and Environmental Engineering, Utah State University Chen, Zhe (Zhe Chen) - Department of Energy Technology, Aalborg University Go back to Individual Researchers Collections: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z California at Berkeley. University of - Energy Institute, Workable Energy Regulation Program Catholic University of Chile (Universidad Católica de Chile) -

11

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

B C D E F G H I J K L M N O P Q R S B C D E F G H I J K L M N O P Q R S T U V W X Y Z Allen, John F. (John F. Allen) - School of Biological and Chemical Sciences, Queen Mary, University of London Angenent, Lars T. (Lars T. Angenent) - Department of Biological and Environmental Engineering, Cornell University Archer, Cristina Lozej (Cristina Lozej Archer) - College of Earth, Ocean, and Environment, University of Delaware Armanini, David G (David G Armanini) - Canadian Rivers Institute, University of New Brunswick Go back to Individual Researchers Collections: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z American University of Beirut, Faculty of Engineering and Architecture, Energy Research Group Australian Cooperative Research Centre for Renewable Energy, ACRELab

12

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

29, 2014 1 MP No. 741 Subject: SOL heat and particle transport studies of inner-wall limited discharges From: J.L. Terry, B. LaBombard, R. Pitts (IO), M. Kocan (IO), C. Theiler, S....

13

EIS-0457: EPA Notice of Availability of a Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Comment Period Ends: 03/05/12 Submit Comments to: Douglas Corkran Environmental Specialist Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-7646 Fax: 503-230-5699 Electronic mail: dfcorkran@bpa.gov EIS-0457-EPANOADEIS-2012.pdf More Documents & Publications EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

14

Technical Memorandum To: File From: Jim Eidem Subject: Environmental Soil Data, Proposed Turbine Area, UMore Park  

Broader source: Energy.gov (indexed) [DOE]

Technical Memorandum Technical Memorandum To: File From: Jim Eidem Subject: Environmental Soil Data, Proposed Turbine Area, UMore Park Date: October 1, 2010 Project: 23191060.00 c: Brian Kombrink (Ryan Co.), Janet Dalgleish (UMN), Dan Mielke (UMN), Jeff Marr (UMN), John Wachtler (Barr) Attached is a table summarizing the analytical data from the proposed wind turbine area and a map showing the locations of the test trenches. On May 19, 2010, a total of seventeen soil samples were collected from the original proposed turbine location, turbine laydown area, met tower location, and the area in the immediate vicinity of the met tower. Fourteen of the samples were collected at the ground surface (to evaluate soil disturbed during initial site clearing) and three samples were collected at depth in

15

Microsoft Word - Badger Canyon CXWEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum David Tripp Project Manager - TEP-CSB-1 Proposed Action: Badger Canyon Substation Radio Communication Tower Project Budget Information: Work Order 00253262 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." B1.19 "Siting, construction, and operation of microwave and radio communication towers and associated facilities..." Location: Badger Canyon Substation, Benton County, Washington - Township 8 North, Range 28 East, Section 1 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace a 40-foot monopole communication

16

Environmental durability of FRP bond to concrete subjected to freeze-thaw action  

E-Print Network [OSTI]

An experimental study was performed to determine the environmental durability of the adhesive bond between fiber-reinforced plastic (FRP) and concrete. The study specifically focused on freeze-thaw cycling exposure of such ...

Dohnlek, Pavel

2006-01-01T23:59:59.000Z

17

Human birth weight patterns as an indicator of populations subject to environmental stress  

SciTech Connect (OSTI)

The present study was undertaken to address two questions of central importance to the possibility of using birth weight as a monitor of the health status of populations. First, can one discern consistent effects of known influencing factors while controlling for only a small number of other influencing factors. This is important because standard birth certificates provide only a few variables in addition to weight. If known effects are obscured by noise from unknown sources, the effects of environmental stress may likewise be obscured. Second, if known effects are discernable, do known stressed populations show predictable patterns of depressed birth weight.

Curtiss, J.R.B.; Ginevan, M.E.; Brown, C.D.

1981-01-01T23:59:59.000Z

18

Microsoft Word - Alcoa_extension_No2_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

June 22, 2012 June 22, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Mark Miller Account Executive, Long-Term Sales and Purchases - PT-5 Proposed Action: Amendment Number 2 to the Alcoa Power Sales Agreement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A2 - Clarifying or administrative contract actions Location: Portland, OR and Ferndale, WA Proposed by: Bonneville Power Administration (BPA)

19

Microsoft Word - DRAFT Cowlitz Longview CX memo 080910.doc  

Broader source: Energy.gov (indexed) [DOE]

0, 2010 0, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amit Sinha Project Manager - TEP-CSB-2 Proposed Action: Transmission, Fiber, and Relay Upgrades at Cowlitz, Longview Annex, and Cardwell Substations Budget Information: Work Order 00004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment

20

Microsoft Word - 2011_NEPA-CX_Naches_River_21July2011.doc  

Broader source: Energy.gov (indexed) [DOE]

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum Sandra Fife Project Manager - KEWU-4 Proposed Action: Acquisition of properties near the Naches River in Yakima County, Washington for fish and wildlife habitat mitigation. Budget Information: Work Order #00191727 Fish and Wildlife Project No.: 1997-051-00, BPA-005578 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of the transferred structures and equipment, for residential, commercial, or industrial uses (including, but not limited to, office space, warehouses, equipment storage facilities) where, under

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Microsoft Word - CX-Marion and Sand Springs Substation Towers Revised.doc  

Broader source: Energy.gov (indexed) [DOE]

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Tripp Project Manager - TEP-CSB-1 Proposed Action: Marion and Sand Springs Substations Radio Tower Projects Budget Information: Work Orders 00243411 and 00243190; Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Siting, construction, and operation of microwave and radio communication towers and associated facilities... Location: Marion and Deschutes counties, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install new radio towers at the Marion Substation and Sand Springs Substation communication sites in Oregon. BPA must vacate radio frequencies in the 1710-1755MHz band to comply with a Federal law mandating reallocation of

22

Microsoft Word - Grays River Chum Supplementation Program.doc  

Broader source: Energy.gov (indexed) [DOE]

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum J. Baugher Project Manager - KEWL-4 Proposed Action: Gray's River Chum Supplementation Program Fish and Wildlife Project No.: 2008-710-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.20 Small-scale activities undertaken to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders or minor diversion channels), or fisheries. Location: Grays River, Pacific County, Washington Proposed by: Bonneville Power Administration (BPA) and the Washington Department of Fish and Wildlife (WDFW) Description of the Proposed Action: Chum salmon in the Grays River have been identified as a primary population targeted to improve to a level that contributes to recovery of the species (LCFRB

23

Microsoft Word - CX -Lewis County PUD metering_.doc  

Broader source: Energy.gov (indexed) [DOE]

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum John Brank Project Manager - TPC-Olympia Proposed Action: Installation of metering equipment at existing facilities for power scheduling. Budget Information: Work order 00202861, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area... Location: Lewis County, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to install meter equipment at multiple locations in Lewis County, Washington. The project is needed as Lewis county PUD plans to become a BPA Slice customer and needs to obtain meter data at 5 minute intervals. The

24

Microsoft Word - Trappist_Abbey_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Israel Duran - KEC-4 Israel Duran - KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to acquire a conservation easement of the 1310-acre Trappist Abbey property. Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 3 South, Range 3 West, Sections 19-21, 28-33 of the Dundee Quad, in Yamhill

25

Microsoft Word - CX_FINAL_East_Omak_Fiber_9-29-2010.doc  

Broader source: Energy.gov (indexed) [DOE]

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum Jennifer Gumm Project Manager - TPC-BELL-1 Proposed Action: East Omak Substation Fiber Project Budget Information: Work Order #267987 and Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.15 Siting, construction, and operation of small-scale support buildings and support structures and/or small-scale modifications of existing buildings or structures within or contiguous to an already developed area. B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. Location: Near the City of Omak, Okanogan County, Washington Proposed by: Bonneville Power Administration (BPA) and Okanogan Public Utility

26

Risk-Informed Safety Margin Characterization Case Study: Selection of Electrical Equipment to Be Subjected to Environmental Qualification  

SciTech Connect (OSTI)

The Risk-Informed Safety Margin Characterization (RISMC) pathway of the DOEs Light Water Reactor Sustainability (LWRS) program focuses on advancing the state of the art in safety analysis and risk assessment to support decision-making on nuclear power plant operation well beyond the originally designed lifetime of the plants (i.e., beyond 60 years). Among the issues being addressed in RISMC is the significance of SSC aging and how confident we are about our understanding of its impact on the margin between the loads SSCs are expected to see during normal operation and accident conditions, and the SSC capacities (their ability to resist those loads) as the SSCs age. In this paper, a summary is provided of a case study that examines SSC aging from an environmental qualification (EQ) perspective. The case study illustrates how the state of knowledge regarding SSC margin can be characterized given the overall integrated plant design, and was developed to demonstrate a method for deciding on which cables to focus, which cables are not so important from an environmental qualification margin standpoint, and what plant design features or operating characteristics determine the role that environmental qualification plays in establishing a safety case on which decisions regarding margin can be made. The selection of cables for which demonstration of margin with respect to aging and environmental challenges uses a technique known as Prevention Analysis. Prevention Analysis is a Boolean method for optimal selection of SSCs (that is, those combinations of SSCs both necessary and sufficient to meet a predetermined selection criterion) in a manner that allows demonstration that plant-level safety can be demonstrated by the collection of selected SSCs alone. Choosing the set of SSCs that is necessary and sufficient to satisfy the safety objectives, and demonstrating that the safety objectives can be met effectively, determines where resources are best allocated to assure SSC performance margin. The paper describes the resulting component types that were selected by Prevention Analysis and identifies the accident sequence characteristics that cause these component types to be important from an EQ and aging perspective (and, hence, worthwhile evaluating the extent of safety margin). In addition, component types not selected as needing significant margin from an EQ and aging perspective are discussed and an engineering rationale is developed justifying the lack of need to apply resources to demonstrating margin for these component types. This rationale is in terms of design features of the plant and operating characteristics that make these component types less important from an EQ and aging perspective. While the case study focuses on EQ and aging of equipment and cables located inside the containment of this PWR, the prevention analysis method is demonstrated to be an effective technique for identification of minimal collections of components that would be effective in managing safety for a variety of issues associated with aging and long-term operation of the fleet of plants.

D. P. Blanchard; R. W. Youngblood

2014-06-01T23:59:59.000Z

27

ENVIRONMENTAL  

Broader source: Energy.gov (indexed) [DOE]

797 797 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE FOR THE AGUA CALIENTE SOLAR PROJECT IN YUMA COUNTY, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 November 2010 TABLE OF CONTENTS Section Page Executive Summary .................................................................................................................ES-1 Introduction ..........................................................................................................................ES-1 Purpose and Need ...............................................................................................................ES-1 Proposed Action and Alternatives........................................................................................ES-2

28

Subject Index  

Science Journals Connector (OSTI)

The Subject Index provides an alphabetical subject key to the papers abstracted in Astronomy and Astrophysics Abstracts. In order to explain the structure of this Index some general remarks on the construction pr...

G. Burkhardt; U. Esser; H. Hefele; Inge Heinrich

1994-01-01T23:59:59.000Z

29

DOE/EA-1374-SA-01: Avian Predation on Juvenile Salmonids In the Lower Columbia River Research Project Supplement Analysis (March 2002)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration DATE: March 21, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Avian Predation On Juvenile Salmonids In The Lower Columbia River Research Project Supplement Analysis (DOE/EA-1374-SA-01) Bill Maslen Project Manager - KEWR-4 Proposed Action: Avian Predation On Juvenile Salmonids In The Lower Columbia River Research Project-Modifications to originial proposal. Project No.: 199702400 Location: Columbia and Snake Rivers Proposed by: Bonneville Power Administration (BPA), and USGS-Oregon Cooperative Fish and Wildlife Research Unit, Oregon State University. Introduction: The Bonneville Power Administration prepared a multi-year Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) on this project in April of

30

Microsoft Word - SNOPUD_Youngs_Cr_Hydro_CX_+_Checklist.doc  

Broader source: Energy.gov (indexed) [DOE]

18, 2010 18, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Customer Service Engineer - TPC-TPP-4 Proposed Action: Interconnection of Snohomish County Public Utility District No.1 (SNOPUD) Young's Creek Hydro Small Generation Budget Information: WO# 00231295, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors,

31

Microsoft Word - LowerJocko_Acquisition_CX_final_081310.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2010 6, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Confederated Salish and Kootenai Tribes (CSKT) for purchase of the Lower Jocko River Property Fish and Wildlife Project No.: 2002-003-00, Contract # BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife

32

Microsoft Word - CX for Spring Basin Wilderness Land Exhange with BLM.docx  

Broader source: Energy.gov (indexed) [DOE]

DATE: June 5, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jason Karnezis Project Manager - KEWL-4 Proposed Action: Spring Basin Wilderness Land Exchange Fish and Wildlife Project No.: 1998-022-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural resources protection, habitat preservation and wildlife management Location: Fossil, Wheeler County, OR (see attached Exhibits A and B for legal land descriptions) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In June 2008 Oregon Senator Wyden introduced legislation to Congress to designate the "Oregon Spring Basin Wilderness (Spring Basin)." In 2008, Spring

33

Microsoft Word - CX_YNSturgeonMgmt_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

United States Government Department of Energy Bonneville Power Administration DATE: December 27, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Roberts Project Manager - KEW Proposed Action: Continuation of Yakama Nation Sturgeon Management Project Fish and Wildlife Project No.: 2008-455-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.20 Small-scale activities undertaken to protect cultural resources (such as fencing, labeling, and flagging) or to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders and minor diversion channels), or fisheries. Location: Prosser and Marion Drain, Benton and Yakima counties, Washington

34

Microsoft Word - Roosevelt-HW-Hill_Landfill-G0335-I0019-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

1, 2009 1, 2009 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Customer Service Engineer - TPC-TPP-4 Proposed Action: H.W. Hill / Roosevelt Landfill Gas Generation Expansion Project (#I0019 and #G0335) Budget Information: Work Order # 244620, Task # 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7: "Acquisition, installation, operation, and removal of communication systems..." B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Klickitat County, Washington Proposed by: Klickitat County Public Utility District No.1 (KPUD) and Bonneville Power

35

Microsoft Word - Energetics Solar CX.doc  

Broader source: Energy.gov (indexed) [DOE]

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Deborah Ruckwardt - TEP-CSB-1 Proposed Action: Integration of G0387 Energetics Solar Integration project into BPA's balancing Authority Budget Information: Work Order # 246335, Task 01 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Lake County, Oregon Proposed by: Bonneville Power Administration (BPA)

36

Microsoft Word - Kennewick Site-PacifiCorp_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

June 22, 2010 June 22, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cynthia Rounds - TPC-TPP-4 Project Manager Proposed Action: The replacement of PacifiCorp's Kennewick - Dayton Hilltop microwave communication equipment. Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA)

37

Microsoft Word - Wireless - Nike CX.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2010 6, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Tim Murray Project Manager - TELP-TPP-3 Proposed Action: Nike Clearwire Wireless Communication Facilities Budget Information: WO# 227499, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Acquisition, installation, operation, and removal of communication systems... B1.15 Siting, construction (or modification), and operation of support buildings or support structures... B1.19 Siting, construction, and operation of microwave and radio communication towers and associated facilities... Location: Washington County, Oregon, Township 1 South, Range 1 West, Section 5 Proposed by: Bonneville Power Administration (BPA)

38

Microsoft Word - Omak-Area-3G-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

9, 2011 9, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roger Thomas Project Manager - TECT-CSB-1 Proposed Action: Omak Area 3G Radio Site Upgrades Budget Information: Work Orders 197229, 197230, & 197231; Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 "Siting, construction, and operation of microwave and radio communication towers and associated facilities..." Location: Okanogan and Douglas counties, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade communication equipment at three existing BPA facilities in Okanogan and Douglas counties, Washington. The work would occur at two

39

Microsoft Word - 2010_NESC_Power_Purchase_Contract_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0, 2010 0, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum John Wellschlager Project Manager - PTL-5 Proposed Action: Output Power Purchase Agreement with Northwest Energy Supply Cooperative - Barr-Tech, LLC Resource Budget Information: #00003863; Task #01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Establishment and implementation of contracts, marketing plans, policies, allocation plans, or acquisition of excess electric power that does not involve: (1) the integration of new generation resource, (2) physical changes in the transmission system beyond the previously developed facility area, unless the changes are themselves categorically excluded, or (3) changes in the

40

Elements of an environmental decision support system for seasonal wetland salt management in a river basin subjected to water quality regulation  

SciTech Connect (OSTI)

Seasonally managed wetlands in the Grasslands Basin on the west-side of California's San Joaquin Valley provide food and shelter for migratory wildfowl during winter months and sport for waterfowl hunters during the annual duck season. Surface water supply to these wetlands contain salt which, when drained to the San Joaquin River during the annual drawdown period, can negatively impact water quality and cause concern to downstream agricultural riparian water diverters. Recent environmental regulation, limiting discharges salinity to the San Joaquin River and primarily targeting agricultural non-point sources, now also targets return flows from seasonally managed wetlands. Real-time water quality management has been advocated as a means of continuously matching salt loads discharged from agricultural, wetland and municipal operations to the assimilative capacity of the San Joaquin River. Past attempts to build environmental monitoring and decision support systems (EDSS's) to implement this concept have enjoyed limited success for reasons that are discussed in this paper. These reasons are discussed in the context of more general challenges facing the successful implementation of a comprehensive environmental monitoring, modelling and decision support system for the San Joaquin River Basin.

Quinn, N.W.T.

2009-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Subject: References:  

Broader source: Energy.gov (indexed) [DOE]

Subject: Subject: References: DEAR 970.3102-2 Compensation for personal services DEAR 970.5204-13 Allowable costs and fixed-fee (Management and operating contracts) DEAR 970.5204-14 Allowable costs and fixed-fee (support contracts) When is this ~\.cquisition Letter (AL) Effective? This AL is effective 10 days from the date of issuance. This gui~ce supersedes any previous statutory cap on executive compensation. Existing contracts need to be reviewed to determine whether contract terms and conditions are consistent with the guidance in this AL, or whether contract modifications are necessary. When Does this AL Expire? This AL remain;; in effect until superseded or canceled. Whom do you Contact for More Information? Contact the Office of Procurement and Assistance Policy, for questions pertaining to the

42

MEMORANDUM SUBJECT:  

Office of Legacy Management (LM)

/ /' MEMORANDUM SUBJECT: ---------------------- OWNER (S) -------- Past I ------------------------ Current: -------------------------- Owner contacted 0 yes 0 no; if yes, date contrctrd ----B-m------ TYPE OF OPERATION ----------------- &Research & Development x Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis ti Production 0 Disposal/Storage K tlmuf 8cturinq 0 University Research 0 Organization 0 Government Sponsored Facility 0 Other -------------------- TYPE OF CONTRACT ---------------- 0 Prime 0 Subcontract& 0 Purchase Order 0 Other information (i.e., cost + fixed fee, unit price, time & material, rtc) ----w-B ---------------------------- Contract/Purchase Order #

43

HEHORANDUU SUBJECT:  

Office of Legacy Management (LM)

HEHORANDUU HEHORANDUU SUBJECT: .I CILTERNATE Pastr________________________ Current:~ -------------------_______ Owner contacted q yes anof if yes, dets contacted IKLE-!PEE_nILm! q Research & Development 0 Production scale testing 0 Pilot Scale q Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis 0 Product i on 0 Disposal/Storage .u Facility Type 0 Uanufacturing q University 0 Research Organization 0 ' Government Sponsored Facility 0 Other --------------------- 0 Prime cl 0 Subcontract& Other information (i.e., cost + fixed fee, unit price, 0 Purchase Order time 81 material, etc) Contract/Purchase Order # -------------------------- OWNERSHiP CIEC/tlED AEC/HED sow owk!m LE_n_sEB OkwE LANDS BUILDINGS EQUIPMENT i z E ORE OR RAW HATL 0 iY i

44

Microsoft Word - Ross-Lexington No1 Meter project-CX .doc  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Tyler Ashburn Project Manager - TPP-3 Proposed Action: Ross-Lexington No. 1 Meter Project Budget Information: Work Order # 00220904 Task 1 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B3.1 Onsite and offsite site characterization and environmental monitoring, including siting, construction (or modification), operation, and dismantlement or closing (abandonment) of characterization and monitoring devices and siting, construction, and associated operation of a small-scale laboratory building or renovation of a room in an existing building for sample analysis. Activities covered include, but are not limited to, site characterization and environmental monitoring under

45

d1325.8e  

Broader source: Energy.gov (indexed) [DOE]

January 29, 2013 January 29, 2013 REPLY TO ATTN OF: BPA-KEC-4 SUBJECT: 2013 Annual National Environmental Policy Act (NEPA) Planning Summary Gregory H. Woods, General Counsel Attached please find Bonneville Power Administration's (BPAs) 2013 Annual NEPA Planning Summary. As requested in your December 7, 2012 memorandum, the summary identifies the status of ongoing environmental assessments (EAs), ongoing environmental impact statements (EISs), EAs expected to be prepared during the next 12 months, and EISs expected to be prepared during the next 24 months. We have included documents for which BPA will be the lead federal agency, as well as documents for which BPA will be a cooperating agency. The EAs and EISs forecasted have a high probability of going forward. However, it is very

46

Microsoft Word - Annual_NEPA_Planning_Summary_2012_Memo ecc.docx  

Broader source: Energy.gov (indexed) [DOE]

31, 2012 31, 2012 REPLY TO ATTN OF: BPA-KEC-4 SUBJECT: 2012 Annual National Environmental Policy Act (NEPA) Planning Summary Timothy G. Lynch, Acting General Counsel Attached please find Bonneville Power Administration's (BPAs) 2012 Annual NEPA Planning Summary. As requested in your December 5, 2011, memorandum, the summary identifies the status of ongoing environmental assessments (EAs), ongoing environmental impact statements (EISs), EAs expected to be prepared during the next 12 months, and EISs expected to be prepared during the next 24 months. We have included documents for which BPA will be the lead federal agency, as well as documents for which BPA will be a cooperating agency. The EAs and EISs forecasted have a high probability of going forward. However, it is very

47

Microsoft Word - Westside-Sub-CX-Amended-5-2010.doc  

Broader source: Energy.gov (indexed) [DOE]

May 25, 2010 May 25, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum (Amended) Amit Sinha Project Manager - TEP-CSB-2 Proposed Action: Westside Substation Additions (Amended) Budget Information: Work Order 00251471 and Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed area... Location: Westside Substation, 3.5 miles southwest of Idaho Falls, Bonneville County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: An environmental clearance memorandum was completed for the project on May 5, 2008. The original document is amended in order to more

48

Microsoft Word - Pasco_LandAquisition_CX_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

12 12 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Rudiger Krohn Project Manager - TESF-CSB-2 Proposed Action: Pasco Land Acquisition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to purchase 19.38 acres of land in Pasco, Washington. The property is located just north/north-west of the intersection of Commercial Avenue and Garland Street. The zoning for this parcel is I-1, or Light Industrial. If BPA decides to develop the property, a separate environmental review will be conducted as needed. The purchase itself would have no effect on the environment.

49

United States Government Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

e Electrons Form Approved by ClLR - e Electrons Form Approved by ClLR - 70/0#2002 (08-89) United States Government Department of Energy - nemorandum Bonneville Power Administration DATE: January 31, 201 1 REPLY TO AITN OF: BPA-KEC-4 SUBJECT: 201 1 Annual National Environmental Policy Act (NEPA) Planning Summary TO: Scott Blake Harris, General Counsel Attached please find Bonneville Power Administration's (BPA's) 201 1 Annual NEPA Planning Summary. As requested in your December 8,2010, memorandum, the summary identifies the status of ongoing environmental assessments (EAs), ongoing environniental impact statements (EISs), EAs expected to be prepared during the next 12 months, and EISs expected to be prepared during the next 24 months. We have included documents for which BPA will be the lead federal agency, as well as documents for which BPA will be a

50

Environmental lead: insidious health problem  

Science Journals Connector (OSTI)

Environmental lead: insidious health problem ... Several federal programs aim to reduce human exposure to lead, but which source is most dangerous is subject of growing controversy ...

LOIS R. EMBER; C&EN; WASHINGTON

1980-06-23T23:59:59.000Z

51

Education research Subject knowledge  

E-Print Network [OSTI]

Education research Subject knowledge and pedagogy in science teacher training October 2011 #12;Subject knowledge and pedagogy in science teacher training John Holman, Senior Fellow for Education subject knowledge (as opposed to general teaching skills), and whether there are significant variations

Rambaut, Andrew

52

Microsoft Word - BingenSwitchDisposition_CXMemo.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2012 7, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Bingen Substation Sectionalizing Switches Disposition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Klickitat County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell two sectionalizing switches owned by BPA but located on PacifiCorp's Condit-Powerdale 69-kilovolt (kV) line in and adjacent to the Bingen Substation. BPA sold the Bingen substation to Klickitat County PUD in 1997 but retained ownership rights to inspect, maintain, repair, and replace its remaining revenue meters,

53

Microsoft Word - CX_FINAL_FOG_MEMALOOSE_MEADOWS_LAND_ACQUISITION_06-03-13  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Emanuel Jaramillo Project Manager - TEP-TPP-1 Proposed Action: Memaloose Meadows Land Acquisition Project Work Order No.: Work Order #327332 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 12 North, Range 12 East, Section 6; Tax Lots 100 and 200, Wasco County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the acquisition of two contiguous parcels consisting of a total of 14.07 acres in Wasco County, Oregon. The funding would be

54

Microsoft Word - CX_PA-Sappho-LLIP-L0254.doc  

Broader source: Energy.gov (indexed) [DOE]

November 30, 2009 November 30, 2009 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Curtis Michael Electrical Engineer - TFOD-OLYMPIA Proposed Action: Port Angeles-Sappho #1 Line Tap Budget Information: Work Order # 00004866, Task # 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Port Angeles, Clallam County, Washington Proposed by: Bonneville Power Administration (BPA) and Clallam County Public Utility District (PUD) Description of the Proposed Action: BPA proposes to install a new tap and associated disconnect structures on BPA's Port Angeles-Sappho #1 115-kV transmission line to provide a

55

Microsoft Word - CX-McLoughlin_Meter_23July2013.doc  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager -TERR-3 Proposed Action: McLoughlin Substation metering panel ownership transfer Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property transfers Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to transfer ownership of two interchange metering panels and associated hardware, which are located in the McLoughlin Substation control house, to Portland General Electric (PGE). In June 2013, BPA started removal of a transformer from the McLoughlin Substation to minimize the BPA footprint within the larger PGE

56

Microsoft Word - CX -Ostrander Substation Expansion.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amit Sinha Project Manager - TEP-CSB-2 Proposed Action: Ostrander Substation Addition Budget Information: Work order 00262568 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Construction of electric power substations (including switching stations and support facilities)....or modification (other than voltage increases) of existing substations and support facilities... Location: Clackamas County, Oregon (T2S, R3E, Sections 26 and 35) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand its existing Ostrander Substation near Barton, Oregon by approximately 4 acres. The expansion would accommodate three new 230/500-kV transformers,

57

Microsoft Word - Ringold Substation Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 1, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum Myra Lovell - TELP-TPP-3 Proposed Action: Ringold Substation Structure Replacement Project Budget Information: Work Order # 00272078 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B4.6 "Additions or modifications to electric power transmission facilities..." Location: Franklin County, Washington - Township 12 North, Range 29 East, Section 26 of the Basin City Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace the single pole structure 8/9 of the Benton-Scooteney No. 1 115-kV transmission line, the attached vertically mounted disconnect switch,

58

Microsoft Word - 09 FW Program SA memo Final_100509.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2009 5, 2009 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-03) Greg Delwiche Vice President, Environment, Fish & Wildlife The attached Supplement Analysis for BPA's Fish and Wildlife Implementation Plan Environmental Impact Statement (FWIP EIS) provides a review of whether BPA should prepare a new or supplemental FWIP EIS in light of the the Northwest Power and Conservation Council's (Council) newly amended 2009 Fish and Wildlife Program (2009 Program). The Supplement Analysis finds that actions that BPA may take to follow the guidance in the Council's 2009 Program are withing the scope of the FWIP EIS and were considered in, and are consistent with, the Preferred Alternative (PA 2002) Policy Direction that BPA adopted in the

59

Microsoft Word - City_of_Sherwood_LURR_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: City of Sherwood Sewer Line Replacement Land Use Review Request Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 Multiple use of powerline rights-of-way Location: Sherwood, Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request (LURR) submitted by the city of Sherwood (city) to replace a portion of its proposed sewer line within existing BPA fee-owned right-of-way (ROW) between structure 19/11 of BPA's Keeler-Oregon City No. 2 115-kilovolt (kV) transmission line and SW Tualatin-Sherwood Road. The city would replace

60

Microsoft Word - Prosser_Shed_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

16, 2011 16, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Patty Smith Project Manager - KEWU-4 Proposed Action: Prosser Hatchery Storage Shed Budget Information: Work order 266311 Task 01 Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.15; Siting, construction (or modification), and operation of support buildings and support structures... within or contiguous to an already developed area. Location: Prosser, Benton County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the construction of a storage shed at the Prosser Hatchery. The proposed size of the building would be 40' x 48' x 14'. The building would have a

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - West Swan_Acquisition_CX_10212010.doc  

Broader source: Energy.gov (indexed) [DOE]

21, 2010 21, 2010 REPLY TO ATTN OF: Bruce Hollen KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Funding the acquisition by the State of Montana of habitat in the West Swan Valley. Fish and Wildlife Project No.: 2008-800-00, Contract # BPA-45235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021) B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

62

Microsoft Word - CX_PerryCreek_4.29.11.doc  

Broader source: Energy.gov (indexed) [DOE]

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife and Parks for purchase of the Perry Creek Property. Fish and Wildlife Project No.: 2008-800-00, Contract 45235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 24 North, Range 17 West, Section 31, Lake County, Montana

63

Microsoft Word - Walla_Walla_hydroproject_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Bob Trismen Project Manager - TEP-CSB-1 Proposed Action: Columbia Rural Electric Association Walla Walla Hydroelectric Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 - Contracts, policies, and marketing and allocation plans for electric power; B4.6 - Additions or modifications to transmission facilities Location: Walla Walla County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Columbia Rural Electric Association's (CREA) small generator interconnection request, BPA proposes to integrate the existing 2.25-megawatt City of Walla Walla hydroproject into the Federal Columbia River Transmission

64

Microsoft Word - L0295-StJohnsTap-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joyce Vaughn Project Engineering - TELP-TPP-3 Proposed Action: L0295 - St. Johns-St. Helens #1 Interconnection Project Budget Information: Work Order #004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Columbia County, Oregon (T4N, R1W, Section 7) Proposed by: Bonneville Power Administration (BPA) and Columbia River PUD (CRPUD) Description of the Proposed Action: BPA proposes to install a new tap and associated disconnect structures on BPA's St. Johns-St. Helens #1 115-kilovolt (kV) transmission line to

65

Microsoft Word - CX_Memo_Mason.docx  

Broader source: Energy.gov (indexed) [DOE]

5, 2012 5, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager - TEP-CSB-1 Proposed Action: Mason Substation Metering Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment. Location: Mason County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to remove existing equipment and install new revenue metering equipment in the existing Mason Substation. Mason County Public Utility District No. 3 (the District), a customer of BPA, owns and operates Mason Substation and plans to rebuild it as a 115/12.5 kV, 24 MVA facility. Mason Substation is a BPA Point of

66

Microsoft Word - Ohop Underbuild CX.doc  

Broader source: Energy.gov (indexed) [DOE]

March 11, 2011 March 11, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joyce Vaughn - TELP-TPP-3 Proposed Action: Ohop Underbuild Project Budget Information: Work Order # 266249 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B4.6 "Additions or modifications to electric power transmission facilities... including the replacement of poles..." B4.12 "Construction of electric powerlines approximately 10 miles in length or less..." Location: Pierce County, WA - Sections 20, 21, and 22, Township 16 North, Range 4 East of the Eatonville Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund approximately 1 mile of Ohop Mutual

67

Microsoft Word - WCT_CX_5.4.12.docx  

Broader source: Energy.gov (indexed) [DOE]

7, 2012 7, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Lee Watts Project Manager - KEWM-4 Proposed Action: Reintroduction of westslope cutthroat trout in the Pend Orielle basin. Fish and Wildlife Project No.: 2007-149-00, Contract #BPA-57129 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.20 Small-scale activities undertaken to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders or minor diversion channels), or fisheries. Location: Two Creeks would be included in the project:  Cee Cee Ah Creek: Township 34 North, Range 44 East, Section 28, Pend Oreille County, WA  East Fork Smalle Creek: Township 33 North, Range 43 East, Section 6, Pend Oreille County, WA

68

Microsoft Word - CX_Memo_Fairmount.docx  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Fairmount Substation Equipment Acquisition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers. Location: Jefferson County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to a request by Jefferson County Public Utility District No.1 (Jefferson PUD), BPA is proposing to take ownership of equipment owned by Jefferson PUD within BPA's existing Fairmount Substation in Jefferson County, WA. Jefferson PUD, a Network Integration Customer of BPA, would sell its 115-kilovolt (kV) line terminal in Bay

69

Microsoft Word - Harrisburg Sub CX Final.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Emmanuel Jaramillo Project Manager - TEP-TPP-3 Proposed Action: Harrisburg Substation Expansion Project Budget Information: Work Order 230941 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Construction of electric power substations (including switching stations and support facilities) with power delivery at 230-kV or below, or modification (other than voltage increases) of existing substations and support facilities, that could involve the construction of electric powerlines approximately 10 miles in length or less, or relocation of existing electric powerlines approximately 20 miles in length or less, but not the integration of major new generation

70

Microsoft Word - Horse_Butte_G0374_Env_ Clearance_Doc.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Cattle Creek Substation (formerly known as Horse Butte Substation) Budget Information: Work Order # 00283812 (TC AUO) and 00283765 (TC) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 "Construction or electric power substations (including switching stations and support facilities) with power delivery at 230-kilovolt (kV) or below, or modification (other than voltage increases) of existing substations and support facilities, ..." Location: Bonneville County, ID near Idaho Falls. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Utah Associated Municipal Power

71

Microsoft Word - CX_Memo_TVWD.docx  

Broader source: Energy.gov (indexed) [DOE]

31, 2012 31, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kilovolt (kV) transmission line corridor in the City of Beaverton,

72

Microsoft Word - WC_Digital_Communication_System_Upgrade_Project_CX_Update.docx  

Broader source: Energy.gov (indexed) [DOE]

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager -TEP-CSB-1 Proposed Action: Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring (update to previous Categorical Exclusion issued on February 22, 2013) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Douglas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In addition to the work described in the previous Categorical Exclusion, BPA proposes to add a permanent gravel parking area next to the existing access road outside BPA's Columbia Substation. The new parking area would be used to

73

Microsoft Word - Coyote Creek CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2013 3, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to acquire a conservation easement over the 310-acre Coyote Creek property. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Veneta and West Eugene quadrangles, in Lane County, Oregon (near Eugene, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund The Nature Conservancy's (Conservancy) purchase of the Coyote Creek property, a 310-acre parcel of land located just west of the

74

Microsoft Word - Peninsula_Light_Co_L0308_NEPA_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

May 05, 2011 May 05, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Peninsula Light Company Line and Load Interconnection Request L0308 Budget Information: 00004866, Task 4 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and/or modifications to electric power transmission facilities within previously developed areas. Location: Mason County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Peninsula Light Company (PLC) submitted a request to BPA for an emergency 115-kV connection to BPA's Shelton-Kitsap #2 115-kV line in order to serve its load in the event of a double circuit loss at the Tacoma Narrows Crossing. In response

75

Microsoft Word - 2012_Rapid_Lightening_Creek_Easement_CX_Rev2.doc  

Broader source: Energy.gov (indexed) [DOE]

24, 2012 24, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Virgil Lee Watts Project Manager - KEWM-4 Proposed Action: AMENDED Provision of funds to the Idaho Department of Fish and Game (IDFG) to purchase the Rapid Lightning Creek Property. Fish and Wildlife Project No.: 1992-061-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Location: Township 58 North, Range 1 West, Section 24 of Bonner County, Idaho Proposed by: Bonneville Power Administration (BPA) and IDFG Description of the Proposed Action: BPA proposes to provide funds to IDFG for a fee-simple title acquisition of an approximately 27-acre parcel of land adjacent to the Rapid Lightning and

76

Microsoft Word - CX_Memo_ChandlerTap_BOR.docx  

Broader source: Energy.gov (indexed) [DOE]

May 17, 2013 May 17, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kevlyn Matthews Project Manager - TPCV-TPP-4 Proposed Action: Chandler Tap Line Reconductoring Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Benton County, Washington; Township 9 North, Range 26 East, Section 17 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to reconduct the terminal span on the Chandler tap to Grandview-Red Mountain No. 1 115-kV line in order to allow the Bureau of Reclamation (BOR) to enlarge their Chandler Power and Pumping Plant switchyard, eliminating safety hazards and reducing the incidence of

77

Microsoft Word - Targhee-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

October 12, 2011 October 12, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Rodger Thomas Project Manager - TECT-CSB-1 Proposed Action: Targhee Substation Communication Equipment Upgrades Budget Information: Work Order # 197237, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.15 Siting, construction, and operation of support buildings and support structures within or contiguous to an already developed area... Location: Township 5 North, Range 4 East, Section 35, Teton County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade communication equipment at its Targhee Substation in Teton County, Idaho. The proposed upgrades are required as part of a large

78

Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA - New Acclimation Sites  

Broader source: Energy.gov (indexed) [DOE]

November 18, 2002 November 18, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA (DOE/EA-1282/SA-03) L. Hermeston - KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: New acclimation sites Project No: 1996-040-00 Location: Upper Wenatchee watershed, Chelan County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA is funding ongoing studies, research, and artificial production of coho salmon in the Wenatchee and Methow river basins. BPA analyzed environmental impacts of these activities in the Mid-Columbia Coho Reintroduction Feasibility Project Final EA, completed in April 1999 (DOE/EA-1282). Supplemental Analyses (DOE/EA-

79

Microsoft Word - CX_PistolCreek_Final.doc  

Broader source: Energy.gov (indexed) [DOE]

25, 2011 25, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes for purchase of the Pistol Creek Property. Fish and Wildlife Project No.: 2002-003-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 17 North, Range 18 West, Sections 30 and 31, Lake County, MT.

80

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft Word - Green_Island_Addition__Melevin__CX_10-21.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to The McKenzie River Trust (MRT) for purchase of Melevin Property Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 16 South, Range 3 West, Section 31 of the Coburg Quad, in Lane County,

82

Microsoft Word - PearlSubExpansion_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz - TEP-CSB-2 Proposed Action: Pearl Substation 500-kilovolt (kV) #6 Bay Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, the addition of a new 500-kV Bay 6, and a one-half acre yard expansion in the southwest corner of the substation. The yard expansion area is within BPA property, consists of mowed grass, and is to facilitate a 40 square foot addition to the Pearl Control House

83

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

84

Microsoft Word - CX_Memo_MonroeSubstation.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-TPP-1 Proposed Action: Monroe Substation Integrated Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electrical power substations and interconnection facilities Location: Snohomish County, Washington; Township 28 North, Range 7 East, Section 22 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The purpose of the project is to provide upgrades required as part of BPA's ongoing sustaining programs by providing voltage support and preventing power outages. The project would consist of the following activities:  Installation of two new 500-kilovolt (kV) shunt capacitor groups with current limiting

85

Microsoft Word - Green_Island_Addition__Melevin__CX.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2010 5, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to The McKenzie River Trust (MRT) for purchase of Melevin Property Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 16 South, Range 3 West, Section 31 of the Coburg Quad, in Lane County,

86

Microsoft Word - BE-K_SA-2_112812  

Broader source: Energy.gov (indexed) [DOE]

F F United States Government Department of Energy Bonneville Power Administration DATE: November 28, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Big Eddy-Knight Transmission Project Final EIS (DOE/EIS- 0421/SA-02) Nathan Mullen Project Manager - TELP-TPP-3 Proposed Action: Big Eddy-Knight Transmission Project new information and design adjustments Proposed by: Bonneville Power Administration (BPA) Location: Klickitat County, Washington Background: In 2011, BPA completed the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421) and issued a Record of Decision (ROD) documenting its decision to build and operate the Big Eddy-Knight transmission line. Construction of the transmission

87

Microsoft Word - PI_NEPA-CX_KittitasCountyCEAcquisition.doc  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 2, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Sandra Fife Project Manager - KEWU-4 Proposed Action: Bonneville Power Administration (BPA) would provide funds to the Washington Department of Fish and Wildlife (WDFW) for the purchase of a conservation easement on 432.3 acres of the Hundley property for fish habitat mitigation in Kittitas County, Washington. BPA would hold a conservation easement on the property and the easement would be protected and co-managed by WDFW, the Yakama Nation's Yakima/Klickitat Fisheries Project (YKFP) and the Kittitas Conservation Trust (KCT). Budget Information: Work Order #00191727 Fish and Wildlife Project No.: 1997-051-00, BPA-004607 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):

88

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

89

Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum John Brank Project Manager - TPC-OL Proposed Action: Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-kilovolt (kV) line/convert microwave signals from analog to digital Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: The BPA Chehalis-Covington project would take place at the Chehalis Substation, in Lewis County, WA, at the Covington Substation, in King County, WA and at Tacoma Power's (TPWR) South Tacoma Substation in Pierce County, WA. Proposed by: BPA Description of the Proposed Action: The BPA and TPWR have developed a joint plan to convert the microwave transfer trip signals

90

Microsoft Word - LaneElectricCooperativeIncBAASA-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

August 3, 2011 August 3, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum J. Diego Ochoa Transmission Account Executive - TSE-TPP-2 Proposed Action: Bonneville Power Administration (BPA) proposes to enter into a 30 year Balancing Authority Area Service Agreement (BAASA) with Lane Electric Cooperative, Inc. (LEC). LEC's King Estate Solar Generator Project (Project) interconnects directly with LEC's 34.5-kilovolt (kV) transmission system, which interconnects with BPA's 34.5-kV Eugene Substation. The Parties propose to enter into an operations and maintenance agreement to enable the Project to operate within BPA's balancing authority area. Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Establishment

91

Microsoft Word - PGE Pearl Fiber CX.doc  

Broader source: Energy.gov (indexed) [DOE]

2, 2011 2, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum Erik Fredrickson - TELP-TPP-3 Proposed Action: Pearl Substation Fiber Project Budget Information: Work Order #279257 Task 01 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." B4.7 "...burying fiber optic cabin in existing transmission line rights-of-way." Location: Clackamas County, Oregon - Section 11, Township 3 South, Range 1 West of the Sherwood Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to allow Portland General Electric (PGE) to install fiber optic cable that connects PGE's distribution network to the BPA-owned Pearl Substation

92

Microsoft Word - CX- Eugene Substation Fiber_130520.docx  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jonathan Toobian Project Manager - TPC-TPP-4 Proposed Action: Eugene Substation Fiber Interconnection Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.7 Fiber Optic Cable Location: Eugene, Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes allowing Light Speed Networks (LSN) to interconnect with its existing fiber optic network at BPA's Eugene substation in Lane County, Oregon. To interconnect to BPA's fiber network, LSN would install two new below ground fiber optic vaults within BPA's existing right-of-way. The first vault would be installed on BPA fee-owned land immediately south of the existing substation entrance, while the second vault

93

Microsoft Word - Coyote Crest Wind Integration CX.doc  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cherilyn Randall - TPC-TPP-4 Proposed Action: G0313 Coyote Crest Wind Park Interconnection Request Budget Information: Work Order # 213848, Task 01 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Lewis County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to EverPower's interconnection request, BPA is

94

Microsoft Word - CaptainJack_Olinda_CX_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cynthia Rounds Project Manager- TPC Proposed Action: Captain Jack-Olinda RAS LLL/LT Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.31 Installation or relocation of machinery and equipment Location: Olinda Substation, Shasta County, CA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund upgrades to BPA equipment at the Transmission Agency of Northern California 500-kilovolt (kV) Olinda Substation (also known as Vic Fazio Substation), which is operated and maintained by Western Area Power Administration (Western). BPA would fund Western to relocate existing and install new

95

Microsoft Word - CX-Hat_Rock_Switch_14June2013  

Broader source: Energy.gov (indexed) [DOE]

7, 2013 7, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Glenn Russell Project Manager -TPCV-TPP-4 Proposed Action: Hat Rock Switching Station Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Umatilla County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund PacifiCorp's rebuild of BPA's Hat Rock Tap Switching Station, which is located within PacifiCorp's McNary-Wallula 230-kilovolt (kV) transmission line right-of-way (ROW). Rebuilding the switching station would include the replacement of sectionalizing switches, the grounding grid, and all signage. The approximately 0.5-acre yard would

96

Microsoft Word - CX_Okanogan_River.docx  

Broader source: Energy.gov (indexed) [DOE]

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Roberts Project Manager - KEWU-4 Proposed Action: Provision of funds to the Colville Confederated Tribes for the purchase of two parcels of land along the Okanogan River. Fish and Wildlife Project No.: 2007-224-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer of land/habitat preservation, wildlife management. Location: The Okanogan River properties are located south of the town of Omak, in Okanogan County, Washington. Proposed by: Bonneville Power Administration (BPA) and the Colville Confederated Tribes (CCT). Description of the Proposed Action: BPA proposes to fund the acquisition of two properties

97

Microsoft Word - G0421-ReedsportWavePark-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum John Schaad Customer Service Engineering - TPC-ALVEY Proposed Action: Reedsport OPT Wave Park Generation Integration (G0421) Budget Information: Work Order # 246379, Task # 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7: "Acquisition, installation, operation, and removal of communication systems..." B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Douglas County, Oregon Proposed by: Douglas Electric Cooperative (DEC), Bonneville Power Administration (BPA) Description of the Proposed Action: Ocean Power Technologies, Inc. (OPT) has requested to

98

Microsoft Word - HighlandsTrail_CX_2011.docx  

Broader source: Energy.gov (indexed) [DOE]

December 21, 2011 December 21, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Project Manager - TERR-LMT Proposed Action: Grant a request by the City of Longview, Washington to build the Highlands Trail in the Longview-Cowlitz No. 1 transmission line right-of-way Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 - Multiple use of powerline rights-of-way Location: Longview, Cowlitz County, Washington Township 7N, Range 2W, Sections 5 and 6 Township 8N, Range 2W, Section 32 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland

99

Microsoft Word - HardingFarms-CX.docx  

Broader source: Energy.gov (indexed) [DOE]

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert - TERR-LMT Proposed Action: Clark County Harding Farms LURR Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Clark County, Washington - Township 3 North, Range 1 East, Section 25 and Vancouver Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to the Clark County Public Works (CCPW) Land Use Review Request (LURR), BPA proposes to grant Clark County two easements across BPA fee-owned parcel south of tower 4/5 of the Ross-Lexington 230-kV transmission line right-of-way. The proposal is necessary due to Clark County PUD's Harding Farms Storm Water and Wetland Improvements Project,

100

Microsoft Word - Alcoa_short-term_amendments_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Mark Miller Account Executive, Long-term Sales and Purchases - PT-5 Proposed Action: Short-term Additional Amendments to the Alcoa Power Sales Agreement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A2 - Clarifying or administrative contract actions Location: Portland, OR and Ferndale, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to execute one or more additional amendments to its existing 2009 Power Sales Agreement (Agreement) with Alcoa, Inc. (Alcoa) to further extend the Agreement's Initial Period provisions. The current date for expiration of these provisions under the most recent amendment (Amendment Number 2) is July 31, 2012.

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - Gardiner-Reedsport CX.doc  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 2, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Gregory Vassallo Project Manager - TPC-ALVEY Proposed Action: Gardiner-Reedsport Substation Interconnection Budget Information: WO# 00004866, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Douglas County, Oregon (Township 21 North, Range 12 West, Sections 4, 13, 15) Proposed by: Bonneville Power Administration (BPA), Central Lincoln Public Utility District (CLPUD) Description of the Proposed Action: CLPUD is installing a new 115-kV line as a backup power source for its Reedsport Substation.

102

Microsoft Word - Springfield_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Greg Baesler Project Manager - KEWU-4 Proposed Action: Provision of funds to Idaho Department of Fish and Game for purchase of 72.53 acres known as the Crystal Springs Trout Farm property under the Snake River Sockeye Captive Propagation Program. Fish and Wildlife Project Number: 2007-402-00, Contract # BPA-005203 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A.7 - Transfer, lease, disposition or acquisition of interests in personal property (e.g., equipment and materials) or real property (e.g., permanent structures and land), if property use is to remain unchanged i.e., the type and magnitude of impacts would remain essentially the same.

103

Microsoft Word - Seven Mile CX.doc  

Broader source: Energy.gov (indexed) [DOE]

October 7, 2010 October 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum - Seven Mile Project Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Seven Mile Project Budget Information: Work Order 00211600 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.11 "Installation of fencing... that will not adversely affect wildlife of surface water flow." B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." B4.11 "Construction or electric power substations (including switching stations and support facilities) with power delivery at 230-kV or below, or modification (other than voltage increases) of existing

104

Microsoft Word - MtRichmond_CX  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Mt. Richmond property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation, and wildlife management. Location: Fairdale and Yamhill quadrangles, in Yamhill County, Oregon (near Yamhill, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Yamhill Soil and Water Conservation District's (YSWCD) purchase of the Mt. Richmond property (Property), a 284.66-acre parcel of land located west of the City of Yamhill in Yamhill County Oregon.

105

Microsoft Word - Final_NineCanyon_CommunicationTowerInstall_CX  

Broader source: Energy.gov (indexed) [DOE]

1, 2013 1, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kelly Gardner, PMP Project Manager, TEP-TPP-1 Proposed Action: Nine Canyon Substation Communication Tower Addition: 331800 McNary Sub Bus Tie Relay Replacements and 310427 McNary-Badger Canyon Transfer Trip Install Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and modifications to transmission facilities Location: Kennewick, Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a 60-foot communications tower and associated communication equipment at the Benton County Public Utility District's Nine Canyon Substation in Benton County, Washington. The upgrade would involve replacing the

106

Microsoft Word - Flathead-Sub-L0307-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

13, 2010 13, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Electrical Engineer - TESD-CSB-2 Proposed Action: Flathead Substation Bay Addition - L0307 Budget Information: Work Order # 00004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Flathead County, Montana (T29N, R21W, Section 30) Proposed by: Bonneville Power Administration (BPA) and Flathead Electric Cooperative (FEC) Description of the Proposed Action: FEC has requested a new 230-kilovolt (kV) point of delivery at

107

Microsoft Word - FlightsEnd_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Flight's End property funding Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Saint Helens quadrangle, in Columbia County, Oregon (near Scapoose, Oregon) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Greenbelt Trust's purchase of the Flight's End property (Property), a 100-acre peninsula located at the north end of Sauvie Island in

108

Microsoft Word - CX-Midway-Vantage-Fiber.doc  

Broader source: Energy.gov (indexed) [DOE]

2, 2011 2, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Midway Area Fiber Project Budget Information: Work Order 00224734, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. Location: Grant and Benton Counties, Washington Township 13 North, Range 24 East, Sections 2, 11, and 14 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install about 1.5 miles of aerial fiber optic cable on the existing Midway-Rocky Ford No.1 230-kilovolt (kV) transmission line. The new fiber

109

Microsoft Word - NEPA-CXandChecklist_OkanoganCountyLandAcquisitions_FINAL.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Sandra Fife Project Manager - KEWU-4 Proposed Action: Bonneville Power Administration (BPA) would provide funds to the Confederated Tribes of the Colville Reservation [Colville Confederated Tribes] (CCT) for the acquisition of two parcels of land for wildlife mitigation in Okanogan County, Washington. Conservation easements would be placed on the two parcels as part of the purchase and the lands would be managed by the CCT. Budget Information: Work Order # 198353 Fish and Wildlife Project No.: 2007-27-007, CR#41714 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat

110

Microsoft Word - CX_Memo_Alvey  

Broader source: Energy.gov (indexed) [DOE]

June 14, 2013 June 14, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Mike Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Alvey Substation 115-kV and 230-kV Breaker Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities. Location: Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to remove six power circuit breakers (PCBs) and install new PCBs within BPA's Alvey Substation near the City of Springfield in Lane County, Oregon. The existing PCBs can no longer be adequately maintained to provide reliable service due to age and deterioration, and replacement parts are no longer available. In

111

Microsoft Word - Longview_SewerMainProject_CX_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Project Manager - TERR-LMT Proposed Action: City of Longview Pump Stations and Force Main Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 - Multiple use of DOE powerline rights-of-way Location: Longview, Cowlitz County, Washington T7N, R2W, Section 5: T8N, R2W, Section 32: and T8N, R2W, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to grant a multiple use request submitted by the City of Longview, Washington, to permanently install an underground sewer line and temporarily locate staging areas within a BPA transmission line right-of-way. The proposed

112

Microsoft Word - StoltzeLandLumber_CX Memo.doc  

Broader source: Energy.gov (indexed) [DOE]

2, 2012 2, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Project Manager - TPC-TPP-4 Proposed Action: Integration of Stoltze Land & Lumber Biomass Generation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment Location: Township 30N, Range 21W, Section 2; Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to a small generation interconnection request from Stoltze Land & Lumber, BPA is planning to integrate 2.5 MW of biomass power into BPA's balancing authority via Flathead Electric Cooperative's (FEC) Trumble Creek Substation. Stoltze Land & Lumber generates electricity from wood waste at their facility near Columbia

113

Microsoft Word - GrantPUD-CX.docx  

Broader source: Energy.gov (indexed) [DOE]

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Walker Miller Project Manager - TPC-PASCO Proposed Action: Grant County PUD - Columbia Substation Interconnection Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: Columbia Substation, Douglas County, Washington - Township 21 North, Range 22 East, Section 21 of the Rock Island Dam Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to a line and load interconnection request made by Grant County Public Utility District (Grant PUD), BPA proposes to interconnect Grant's new 230-kV transmission line into bay 7 within the BPA owned 230-kV Columbia

114

Microsoft Word - Prosser_generator_cx.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Patricia Smith Project Manager - KEWU-4 Proposed Action: Prosser Hatchery Backup Generator Replacement Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.31 Installation or relocation of machinery and equipment. Location: Prosser, Benton County, WA Proposed by: Bonneville Power Administration (BPA Description of the Proposed Action: BPA proposes to fund the replacement of a backup generator that would supply electricity, when necessary, for operations at Prosser Hatchery. The replacement would involve the removal of the existing generator and demolition of its existing concrete platform (8' x 15'). Demolition would be done by jackhammer, and the concrete

115

Microsoft Word - MunroControlCenterExpansionCX.docx  

Broader source: Energy.gov (indexed) [DOE]

9, 2012 9, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joseph Bebee TESF-CSB-2 Proposed Action: Munro Control Center Expansion Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.15 Support Buildings Location: Spokane, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes a 30,000 square foot (sf) expansion to the east side of the existing building and a total of 53,500 sf of additional paved surfaces for access roads and parking to the north. All proposed activities would be on previously disturbed BPA property. The expansion of the existing Munro Control Center is to provide an alternate facility that would support critical BPA functions in the case of a major

116

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

117

Microsoft Word - CX_Memo_Beck.docx  

Broader source: Energy.gov (indexed) [DOE]

January 07, 2013 January 07, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager - TEP-CSB-1 Proposed Action: Beck Road Substation Meter Installation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment. Location: Kootenai County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25

118

Celilo Sub CX  

Broader source: Energy.gov (indexed) [DOE]

25, 2013 25, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Celilo Converter Station Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: The Dalles, Wasco County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Celilo Converter Station in The Dalles, Oregon. The converter station is reaching the end of its service life and has outdated technology and equipment that has resulted in ongoing reliability and maintenance issues. BPA proposes to perform upgrades to the station in order to improve reliability and to bring it up to current technical and

119

Microsoft Word - CX_Memo_Whitefish.docx  

Broader source: Energy.gov (indexed) [DOE]

, 2012 , 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Anna Cosola Project Manager - TPC-TPP-4 Proposed Action: Whitefish In-line Hydroelectric Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Contracts, policies, and marketing and allocation plans for electric power. Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to the City of Whitefish's small generator interconnection request, BPA proposes to integrate their existing 261-kW In-Line Hydroelectric Project into the Federal Columbia River Transmission System (FCRTS). The proposed point of receipt of the electricity generated from the Whitefish In-line Hydroelectric Project is the

120

Microsoft Word - CX_Memo_Lex-Del  

Broader source: Energy.gov (indexed) [DOE]

0 2013 0 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kV transmission line to Cowlitz County Public Utility District No.1 (Cowlitz PUD) in Cowlitz County, WA. BPA would sell the first four spans of the line, from BPA's Lexington Substation to approximately 2,000 feet northwest to structure 30/8,

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08)  

Broader source: Energy.gov (indexed) [DOE]

April 7, 2004 April 7, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08) memorandum David Byrnes Project Manager - KEWL-4 TO: Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the coho acclimation research task would be modified to include a new site located in the upper Yakima south of Cle Elum, WA. Project No.: F3204 Location: Cle Elum, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Yakima Fisheries Project Final Environmental Impact Statement (YFP EIS)

122

Microsoft Word - RailroadIsland_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Railroad Island Property Funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Monroe Quadrangle, in Lane County, Oregon (near Junction City, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund The Mackenzie River Trust (the Trust) to acquire a 63-acre parcel that will be known as Railroad Island. The Trust will provide BPA a conservation easement over the entire 63-acre property that will prevent

123

Microsoft Word - CX_Memo_SchultzROW.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Brandee Shoemaker Project Manager - TERM-TPP-4 Proposed Action: Schultz-Raver No.1 Right-Of-Way (ROW) Marking Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance Location: Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to survey and mark the northern boundary of its transmission line ROW for the Schultz-Raver No.1 and Schultz-Echo Lake No.1 transmission line corridor in Kittitas County, WA. Due to high development pressure, a lack of visible signage, and incomplete county records, encroachments into the ROW have occurred in the

124

Microsoft Word - CX_Memo_Kspell  

Broader source: Energy.gov (indexed) [DOE]

01, 2013 01, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Kalispell Substation Shunt Capacitor Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Electric power substations and interconnection facilities Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand the substation yard, install new equipment, and construct a new control house within BPA's existing 115-kilovolt (kV) Kalispell Substation in Flathead County, Montana. Existing low voltage conditions at Kalispell Substation could compromise system reliability in the event of a single line loss, which violates BPA steady-

125

Microsoft Word - PGE LURR - CX.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Monica Stafflund Realty Specialist - TERR-Chemawa Proposed Action: Portland General Electric (PGE) 13-kilovolt (kV) Overhead Electrical Line Land Use Review Request (LURR) Budget Information: 00184006, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way. Location: Township 7 south, Range 3 West, Section 17, Polk County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow PGE a 1-mile long, 20-foot wide easement on BPA fee-owned property for the purpose of constructing a new 13-kV power line parallel to BPA's existing Chemawa-Salem transmission line in Polk County, Oregon. Construction disturbance

126

Microsoft Word - CX-Paisley_Meter_08Aug2013.doc  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager -TEP-CSB-1 Proposed Action: Paisley Geothermal Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Lake County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate Surprise Valley Electrification Corporation's (SVEC) 3.65-megawatt Paisley Geothermal Project into BPA's balancing authority (BA) in response to a SVEC small generator interconnection request. The proposed point of interconnection would be at SVEC's existing Paisley Substation. In order to integrate the proposed geothermal generation project, BPA would provide and review metering drawings,

127

Microsoft Word - SYF_CX  

Broader source: Energy.gov (indexed) [DOE]

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: South Yamhill property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation, and wildlife management. Location: Fairdale and Yamhill quadrangles, in Yamhill County, Oregon (near Yamhill, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund Duck Unlimited's (DU) purchase of the South Yamhill property (Property), a 91.23-acre parcel of land located northwest of Amity in Yamhill

128

Microsoft Word - CX_FINAL_Sale_of_Eight_Spans_Tanner_Tap_115-kV_Transmission_Line_to_PSE_6-5-2012_.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan B. Kendall Project Manager -TERR-3 Proposed Action: Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24. Property Transfer Location: King County, Washington; Township 24 North, Range 7 East, Section 36, Willamette Meridian Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell to Puget Sound Energy (PSE) the first eight spans of its 115-kV Tanner Tap to Snoqualmie-Lake Tradition #1 transmission line (Tanner Tap-8). Tanner Tap-8, built in 2002, is owned and operated by BPA and located within a 150 feet

129

Microsoft Word - CX_West Chewuch Conservation Easement_FINAL.doc  

Broader source: Energy.gov (indexed) [DOE]

8, 2010 8, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jay Marcotte Project Manager - KEWU-4 Proposed Action: Bonneville Power Administration (BPA) would provide funds to the Confederated Tribes and Bands of the Yakama Nation (Yakama Nation) for the acquisition of a conservation easement for fish habitat mitigation in Okanogan County, Washington. The conservation easement would preserve anadromous fish habitat through the Columbia Basin Fish Accords and would be held and managed by the Methow Conservancy. Budget Information: Work Order # 00266311 Fish and Wildlife Project No.: 2009-003-00, CR#42460 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A7. Transfer, lease, disposition or acquisition of interests in personal property...if property use is to remain unchanged;

130

Microsoft Word - Shaniko - CX.docx  

Broader source: Energy.gov (indexed) [DOE]

1, 2012 1, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum David Tripp Project Manager - TEP-CSB-1 Proposed Action: Shaniko Radio Station Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Siting/construction/operation of microwave/radio communication towers Location: Township 6 South, Range 16 East, Sections 20 and 29, Wasco County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a new VHF/UHF radio system on the existing BPA Shaniko Radio communication tower, and to construct a new 600 square foot radio station adjacent to the existing fiberglass radio station that has reached the end of its

131

Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2003 2, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01) TO: Greg Baesler Project Manager - KEWU-4 Proposed Action: Colville Resident Trout Hatchery Project-Modifications to original proposal Project No.: 1985-038-00 Location: Colville Indian Reservation, Okanogan County, Washington Proposed by: Bonneville Power Administration (BPA) Introduction: The Bonneville Power Administration prepared an Environmental Assessment (DOE/EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a

132

Microsoft Word - SA-06-EIS-0169-Holmes Coho site.doc  

Broader source: Energy.gov (indexed) [DOE]

DATE: March 12, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-06) David Byrnes Project Manager - KEWL-4 Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the coho acclimation research task would be modified to include a new site located in the Upper Yakima north of Ellensburg, WA. Project No.: F3204 Location: Ellensburg, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Yakima Fisheries Project Final Environmental Impact Statement (YFP EIS) (USDOE/BPA 1996) analyzed impacts of undertaking fishery research and mitigation

133

Microsoft Word - NEPA_CX_FINAL_Lancaster_Line_and_Load_Project_06-15-2012.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Lancaster Line and Load Project - LO311 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities B4.7 Fiber optic cable Location: Lancaster Substation, Kootenai County, Idaho; approximately 2.2 miles southwest of Rathdrum, Idaho, (Township 51 North, Range 5 West, Section 11). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to add equipment to its existing Lancaster Substation, replace one transmission structure, modify one existing structure, and replace existing

134

Microsoft Word - Naselle Tap Modification Loop to Driscoll Sub CX.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-CSB-2 Proposed Action: Naselle Tap Modification Loop into Driscoll Substation Budget Information: Work order 231878 task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Construction or modification of electric power substations. B4.6 Additions/modifications to electric power transmission facilities within previously developed area. Location: Clatsop County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to expand the existing Driscoll Substation to accommodate a 115-kV ring bus and rebuild 2 ½ miles of the Allston-Astoria No. 1 line to

135

Microsoft Word - CX_FINAL_FOG_VISTA_VIEW_FIELDS_06-21-13  

Broader source: Energy.gov (indexed) [DOE]

June 19, 2013 June 19, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Emanuel Jaramillo Project Manager - TEP-TPP-1 Proposed Action: Vista View Fields Land Acquisition Project Work Order No.: Work Order #327332 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 1 North, Range 5 East, Section 19; Tax Lot 600, Skamania County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the acquisition of a 15.72-acre parcel in Skamania County, Washington. The funding would be provided to the Friends of the

136

Microsoft Word - Vera Tap CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Victor Hitchens Project Manager - TPC-BELL-1 Proposed Action: Vera Tap to Trentwood Valley Way #1 Project Budget Information: Work order 251700, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions/modifications to electric power transmission facilities within previously developed area. B4.13 Reconstruction and minor relocation of existing electric powerlines approximately 20 miles in length or less. Location: Trentwood, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to add a disconnect switch and 2 wood poles between two existing pole structures

137

Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-06)  

Broader source: Energy.gov (indexed) [DOE]

May 28, 2004 May 28, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-06) Deb Malin Project Manager - PT-5 Proposed Action: Memorandum of Agreement between Bonneville Power Administration (BPA) and Bonneville Environmental Foundation (BEF) to help support BEF's renewable resources activities. Location: Unknown at this time, but likely throughout the Pacific Northwest. Proposed by: BPA and BEF. Description of the Proposed Action: BPA proposes to enter into a Memorandum of Agreement (MOA) to provide annual funding to the BEF. The BEF is a non-profit organization that supports watershed restoration programs and development of new sources of renewable energy, such as wind, solar, hydro, and landfill gas, in the Pacific Northwest. The MOA would

138

Microsoft Word - CX-Rattlesnake-Garrison_ROW_Marking_06June2013  

Broader source: Energy.gov (indexed) [DOE]

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum P. Hastings Project Manager - TERM-TPP-4 Proposed Action: Rattlesnake-Garrison Right-of-Way Marking Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance Location: Missoula County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to survey and mark the Rattlesnake- Garrison transmission line right-of-way (ROW) boundary in Missoula County, Montana. The installation of signs to mark BPA's ROW would prevent encroachment from homeowners and developers, ensure the safety of nearby residents, and allow for the continued safe maintenance and operation of BPA's transmission lines.

139

Microsoft Word - Alcoa_amendment_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Mark Miller Account Executive, Long-term Sales and Purchases - PT-5 Proposed Action: Amendment Number 1 to the Alcoa Power Sales Agreement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A2 - Clarifying or administrative contract actions Location: Portland, OR and Ferndale, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to amend its existing 2009 Power Sales Agreement (Agreement) with Alcoa, Inc. (Alcoa) to extend the Agreement's Initial Period provisions for up to approximately 35 days beyond what is specified in the existing Agreement. More specifically, this amendment would allow the existing Agreement's Initial Period

140

Microsoft Word - OldSchoolHouse-CX Memo.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jay Marcotte Project Manager, KEWU-4 Proposed Action: Old School House Property Funding Fish and Wildlife Project No.: 2009-003-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Location: Twisp, Okanogan County, WEA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the purchase of 63.7 acres in Okanogan County, Washington to protect fish habitat and wildlife habitat. The property includes 1,480 feet of Beaver Creek, a tributary of the Methow River. The Methow Salmon Recovery

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Microsoft Word - Spring-Chinook_CX_6.28.11.doc  

Broader source: Energy.gov (indexed) [DOE]

July 21, 2011 July 21, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Patricia Smith Project Manager - KEWL-4 Proposed Action: Small-scale spring Chinook and coho reintroduction Fish and Wildlife Project No.: 1995-063-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.20 Small-scale activities undertaken to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders or minor diversion channels), or fisheries. Location: Cle Elum, Yakima County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow the use of excess Cle Elum Hatchery supplementation line (S-line) spring Chinook adults and coho adults in a reintroduction

142

Microsoft Word - Chahalpam_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

2, 2012 2, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Chahalpam Property Funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Stayton Quadrangle, in Marion County, Oregon (near Stayton, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to provide funds to Western Rivers Conservancy (WRC) to purchase the 338-acre Chahalpam property near Stayton in Marion County, Oregon for the purposes of fish habitat conservation. Western Rivers

143

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

144

Microsoft Word - ProvisionsFundsColvilleConfederatedTribesPurchaseLoupLoupCreekAeneasCreekProperties_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Roberts Project Manager - KEWU-4 Proposed Action: Provisions of funds to the Colville Confederated Tribes for purchase of the Loup Loup Creek and Aeneas Creek properties. Fish and Wildlife Project No.: 2008-104-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

145

EIS-0241-SA-01-2005.pdf  

Broader source: Energy.gov (indexed) [DOE]

May 16, 2005 May 16, 2005 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Hood River Fisheries Project Environmental Impact Statement (DOE/EIS-0241/SA-01) P. Lofy - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Hood River Production Program Activities Project No: 19880530x Location: Hood River County, Oregon Proposed by: Bonneville Power Administration (BPA), Oregon Department of Fish and Wildlife (ODFW), and Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Description of the Proposed Action: The Hood River Fisheries Project EIS discussed the components of and activities undertaken by the ODFW and CTWSRO to implement the Hood River Production Program. In the 1996 EIS, we anticipated that Phase II of the project, which is

146

Microsoft Word - Forest Grove Expansion I CX.doc  

Broader source: Energy.gov (indexed) [DOE]

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amit Sinha - TEP-CSB-2 Proposed Action: Forest Grove Substation Expansion Budget Information: Work Order # 255319 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B4.6 "Additions or modifications to electric power transmission facilities..." Location: Washington County, OR - Section 32, Township 1 North, Range 3 West of the Forest Grove Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand Forest Grove Substation located in Washington County, OR. The purpose of this project is to improve load service and reliability within the Portland vicinity as per the NERC reliability standards. Within the existing Forest Grove Substation, the

147

Microsoft Word - JC_ShuntCapacitorAddition_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

April 21, 2010 April 21, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy M. Freel Project Manager - TEP-CSB-2 Proposed Action: Shunt Capacitor Addition at Jones Canyon Substation Budget Information: 00232732, Task 1 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 - Construction of electric power substations at 230-kV or modification of existing substations and support facilities. Location: Arlington, Gilliam County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA will expand its Jones Canyon Substation by 114,680 square feet (2.6 acres) beyond the existing substation area that exists within the fence- line of the substation property to install shunt capacitors. The new shunt capacitors will help

148

Microsoft Word - LuckiamuteMeadows_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Luckiamute Meadows property funding. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Kings Valley quadrangle, in Benton County, Oregon (near Kings Valley, Oregon) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund the Greenbelt Trust's purchase of the Luckiamute Meadows property (Property), a 73.6-acre parcel of land located just east of Kings Valley

149

Microsoft Word - CX_ThorneCreek_Final.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes for purchase of the Thorne Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract CR-201269 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

150

Microsoft Word - Longview-WashWay Acquisition REVISED CX.docx  

Broader source: Energy.gov (indexed) [DOE]

22, 2012 22, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: AMENDED: Acquisition of a portion of Cowlitz County Public Utility District's (CCPUD) 115-kV transmission line from BPA's Longview Substation to CCPUD's Washington Way Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Township 8 North, Range 3 West, Section 36, and Township 8 North, Range 2 West, Sections 31 and 32 in Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to acquire a 1.5 mile portion of CCPUD's existing Longview-Washington Way 115-kV transmission line in order to provide a parallel

151

Microsoft Word - SCADA CX.doc  

Broader source: Energy.gov (indexed) [DOE]

8, 2010 8, 2010 REPLY TO ATTN OF: Claire Bingaman KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Project Manager - TPC-TPP-4 Proposed Action: SCADA Upgrades at BPA's Hungry Horse, Bonneville, and Grand Coulee Substations Budget Information: Hungry Horse: WO# 00246171, Task 01 Bonneville: WO# 00246173, Task 01 Grand Coulee: WO# 00246244, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power facilities that would not affect the environment beyond the previously developed facility area.... Location: Grant County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install Supervisory Control and Data Acquisition (SCADA) upgrades at the

152

Microsoft Word - CX - Augspurger 071410.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Glenn Van Bergen Project Manager - TEP-TPP-3 Proposed Action: Augspurger Fiber Replacement Project Budget Information: WO# 00253034, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission rights-of-way.... B1.7 Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment.... Location: Skamania County, Washington Township 3 North, Range 8 East, Sections 13, 23, 24, 26 Township 3 North, Range 9 East, Sections 15, 17, 18, 20, 21, 22 Proposed by: Bonneville Power Administration (BPA)

153

Microsoft Word - ATT I205 Burton Road CX.docx  

Broader source: Energy.gov (indexed) [DOE]

9, 2012 9, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Tim Murray Project Manager - TELP-TPP-3 Proposed Action: AT&T Fiber Addition North Bonneville-Ross No. 2 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber optic cable Location: Vancouver, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to allow AT&T to install an additional fiber optic line and vault within BPA's North Bonneville-Ross right-of-way easement and into an existing wireless communication facility. BPA has a commercial lease agreement with AT&T for co-location on its facilities and AT&T must request permission to update those facilities when they

154

Microsoft Word - MillerBaldTaftPR_Lines_CX Memo.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 4, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Tripp Project Manager - TEP-CSB-1 Proposed Action: Bald Mountain, Miller Peak, Lines Creek, and Taft Passive Repeater Communication Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meterological amd radio towers Location: Mineral and Missoula counties, Montana; Shoshone County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace the analog communication system with a new digital communication system at four existing communication sites in Montana and Idaho to enable the connection of the digital circuits and ensure communication reliability. All of the sites are located on land managed by

155

Microsoft Word - Riverbend BAASA.doc  

Broader source: Energy.gov (indexed) [DOE]

, 2010 , 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Russell Paulsrude Public Utilities Specialist - TSES-TPP-2 Proposed Action: Bonneville Power Administration (BPA) and WM Renewable Energy, LLC (WRE) are entering into a Balancing Authority Area Service Agreement (BAASA). WRE's Riverbend Landfill Generation Project will be dynamically scheduled to Seattle City Light's Balancing Authority (BAA) but interconnected to BPA's BAA. BPA will install metering equipement at BPA's McMinnville 115-kV Substation. Budget Information: Work Order 00004866 and Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Establishment and implementation of contracts, marketing plans, policies, allocation plans, or acquisition of

156

Microsoft Word - DiamondB_Easement_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

16, 2011 16, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife & Parks to purchase the Diamond B conservation easement. Fish and Wildlife Project No.: 2008-800-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there will be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 28N, Range 20W, Sections 28 and 33 in Flathead County, MT

157

Microsoft Word - CX_Cederosa Phase I completion.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 5, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jay Marcotte Project Manager - KEWU-4 Proposed Action: To provide BPA funding to acquire the Cedarosa Phase I completion parcel and to maintain this parcel and the 3 other Phase I parcels for fish habitat protection. Budget Information: Work Order # 00266311 Fish and Wildlife Project No.: 2009-003-00, BPA-004560 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in

158

Microsoft Word - Kokanee Bend CX.docx  

Broader source: Energy.gov (indexed) [DOE]

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Kokanee Bend South Conservation Easement funding Fish and Wildlife Project No. and Contract No.: 2008-800-00, BPA-006863 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 30 North, Range 20 West, Section 30, Flathead County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA intends to fund Montana Fish, Wildlife, and Parks (MFWP) for the purchase of a conservation easement, on approximately 70 acres of property,

159

Microsoft Word - CX_Memo_Amended_TVWD.docx  

Broader source: Energy.gov (indexed) [DOE]

9, 2013 9, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request (update to previous Categorical Exclusion issued on December 31, 2012) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-

160

Microsoft Word - DeMoss Fossil CX.doc  

Broader source: Energy.gov (indexed) [DOE]

13, 2010 13, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Emmanuel Jaramillo Project Manager - TEP-TPP-1 Proposed Action: De Moss-Fossil 115-kV Line Upgrade Budget Information: 00220054 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions/modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area... Location: De Moss Substation is located in Section 3, Township 1 South, Range 17 East, Wasco County, Oregon. The Fossil Substation is located in Section 33, Township 6 South, Range 21 East, Wasco County, Oregon. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action:

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Microsoft Word - 4 ATT Sites - CX.docx  

Broader source: Energy.gov (indexed) [DOE]

7, 2012 7, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Tim Murray Project Manager - TELP-TPP-3 Proposed Action: Four AT&T Wireless Communication Site Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Acquisition, installation, operation, and removal of communication systems... B1.19 Siting, construction, and operation of microwave and radio communication towers and associated facilities... Locations: Township 3 North, Range 6 West, Section 14, Clallam County, Washington Township 26 North, Range 42 East, Section 16, Spokane Couny, Washington Township 28 North, Range 6 East, Section 4, Snohomish County, Washington Township 38 North, Range 3 East, Section 14, Whatcom County, Washington

162

Microsoft Word - Spring Creek Final Draft CX 7-15-2013.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Spring Creek Property funding Fish and Wildlife Project No. and Contract No.: 2002-003-00, BPA-007168 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 17 North, Range 20 West, Section 26, Lake County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the Salish and Kootenai Tribes for the purchase of 10 acres of property, referred to as the Spring Creek Land Acqusition in Lake

163

Microsoft Word - CSKT_CXMemo_12062010.doc  

Broader source: Energy.gov (indexed) [DOE]

09, 2010 09, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Confederated Salish and Kootenai Tribes (CSKT) for purchase of the Conrad Drive Land Acquisition. Fish and Wildlife Project No.: 2002-003-00, Contract # BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

164

Microsoft Word - Delrio_ChiefJo_FosterCreek_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager -TEP-CSB-1 Proposed Action: D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Douglas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade communication equipment at three existing facilities in Douglas County, Washington. The work would occur at two of BPA's substations, Del Rio and Chief Joseph, and at BPA's Foster Creek radio site. Activities at these sites are in connection with the retirement of BPA's D analog communication system. At Del Rio, activities would

165

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

166

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

167

Microsoft Word - CX_LwrElochoman_LandAcquisition.docx  

Broader source: Energy.gov (indexed) [DOE]

2, 2012 2, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Jason Karnezis Project Manager - KEWL-4 Proposed Action: Provision of funds to the Columbia Land Trust for the purchase of five parcels of land located near the Lower Elochoman River Fish and Wildlife Project No.: 2010-073-00, Contract # 52484 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfer for cultural resources protection, habitat preservation, and wildlife management. Location: The project is located along the lower Elochoman River in western Wahkiakum County in Township 9 N, R 6 W, Sections 26, 35, and 36 near Cathlamet, Washington. Proposed by: Bonneville Power Administration (BPA)

168

Microsoft Word - BIAddition_Hunsaker__CX.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 7, 2010 REPLY TO ATTN OF: Israel Duran KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to McKenzie River Trust for purchase of Big Island Addition (Hunsaker) Property Fish and Wildlife Project No.: 1992-068-00, Contract # BPA-005027 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

169

Microsoft Word - St %20Clair%20Olympia%20CX.doc  

Broader source: Energy.gov (indexed) [DOE]

03, 2009 03, 2009 REPLY TO ATTN OF: Claire Bingaman KEC-4 SUBJECT: Environmental Clearance Memorandum Theresa Berry Project Manager - TEP-TPP-3 Proposed Action: Olympia Substation Bay Addition Budget Information: WO# 00225362, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including Location: Thurston County, Washington, Township 18 North, Range 2 West, Section 32 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Puget Sound Energy (PSE) has requested a new 115-kV Point of Delivery from BPA's Olympia Substation. In order to accommodate this request, BPA

170

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

171

Microsoft Word - Noxon Radio Station Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 5, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Noxon Radio Station Upgrade Project Budget Information: Work Order # 00254987 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Sanders County, Montana - Section 33, Township 26 North, Range 32 West of the Noxon Rapids Dam Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace the existing building at Noxon Radio Station with a new 650 square foot building. The existing building, especially the floor, is deteriorating

172

DOE/EA-1374-SA-05: Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project Supplement Analysis (03/20/06)  

Broader source: Energy.gov (indexed) [DOE]

0, 2006 0, 2006 REPLY TO ATTN OF: KEC-4 SUBJECT: Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project Supplement Analysis (DOE/EA-1374-SA-05) Dorie Welch - KEWU-4 Project Manager Proposed Action: Avian Predation On Juvenile Salmonids in the Lower Columbia River Research Project - Modifications to Original Proposal Project No: 1997-02-400 Location: Columbia and Snake Rivers Proposed by: Bonneville Power Administration (BPA), USGS-Oregon Cooperative Fish and Wildlife Research Unit, Oregon State University, and U. S. Army Corps of Engineers. Introduction: The Bonneville Power Administration prepared a multi-year Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) on this project in April of 2001

173

Microsoft Word - BHF_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Bald Hill Farms property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation, and wildlife management. Location: Corvallis quadrangle, in Benton County, Oregon (near Corvallis, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Greenbelt Land Trust's purchase of the Bald Hill Farms property (Property), a 483-acre parcel of land located just west of the City of

174

Microsoft Word - Chenoweth-Substation-3G-RS-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2010 4, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Creig Millen Project Manager - TEC-CSB-1 Proposed Action: Chenoweth Substation 3G Radio Station Project Budget Information: Work Order 00197213, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Siting, construction, and operation of microwave and radio communication towers and associated facilities... Location: Wasco County, Oregon (T2N, R13E, Sections 21and 28) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to construct a 120-foot radio tower and antenna system at BPA's Chenoweth Substation in Wasco County, Oregon. The new tower will require a 20 x 20 foot expansion of the existing substation yard and will replace an existing 50-foot monopole

175

Microsoft Word - FarmPowerMistyMeadows_CX_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

0, 2012 0, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Project Manager - TPC-TPP-4 Proposed Action: Integration of the Farm Power Misty Meadows Generating Facility Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 - Electric equipment Location: Tillamook County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Farm Power Misty Meadow's (Farm Power's) small generator interconnection request, BPA is planning to integrate their 1-MW biomass generation project into its balancing authority (BA). The proposed point of interconnection is Tillamook PUD's Feeder Circuit #63, which is connected to the Tillamook PUD's Wilson River Substation. In order to integrate the

176

Microsoft Word - lemhi cottombeyeler cx.doc  

Broader source: Energy.gov (indexed) [DOE]

9, 2010 9, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joe DeHerrera Project Manager - KEWM-4 Proposed Action: Provision of funds to The Nature Conservancy (TNC) to purchase conservation easements on Cottom and Beyeler Properties Fish and Wildlife Project No.: 2008-601, Bonneville Power Administration (BPA) Contract #: 005420 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer of land/habitat preservation, wildlife management. Location: Lemhi County, Idaho Proposed by: BPA and the State of Idaho Description of the Proposed Action: BPA is currently working with the State of Idaho to fund TNC's acquisition of an approximately 2,354-acre conservation easement in Idaho's Upper

177

Microsoft Word - L0296_Updated_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

1, 2012 1, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Michael R. Gilchrist, Project Manager, TEP-TPP-1 Gregory L. Vassalo, Coordinating Engineer, TPCV-Alvey Proposed Action: Midstate Electric Cooperative, Inc, Integration Request, Line and Load Interconnection Request L0296 (update to previous Categorical Exclusion issued on September 30, 2009) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 - Electric power substations and interconnection facilities Location: Deschutes County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to interconnect Midstate Electric Cooperative, Inc. (MEC) into the Federal Columbia River Transmission System at BPA's La Pine Substation in

178

Microsoft Word - RedmondCXWeb.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz - TEP-CSB-2 Proposed Action: Redmond Substation 230-115-kV Transformer Addition Budget Information: Work Order # 238119 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions/modifications to electric power transmission facilities within previously developed area." Location: Redmond Substation, Deschutes County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to rearrange the 230-115-69-kV yard to install a new 230-115-kV transformer that would increase system reliability by decreasing thermal overloads, voltage violations, and outages caused by the existing 230-115-kV

179

Microsoft Word - Granite-Mt-3G-Radio-Station-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Creig Millen Project Manager - TEC-CSB-1 Proposed Action: Granite Mountain 3G Radio Station Project Budget Information: Work Order 00197218, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Siting, construction, and operation of microwave and radio communication towers and associated facilities... Location: Stevens County, Washington (T34N, R38E, Section 17) Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a new 100-foot radio tower, communication building, and related digital radio equipment at an existing BPA communications site on Granite Mountain in Stevens County, Washington. The new tower and building will upgrade and replace

180

Microsoft Word - Ostrander Line Swap CX.doc  

Broader source: Energy.gov (indexed) [DOE]

March 10, 2011 March 10, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Ostrander Line Swap Budget Information: WO #'s 00261551, 00261552, & 00261553 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 "Construction of electric power substations... or relocation of existing electric powerlines..." Location: Clackamas County, Oregon  Township 2 South, Range 3 East, Sections 26 & 35 of the Redland Quadrangle  Township 2 South, Range 4 East, Sections 16, 17, 20, & 21 of the Sandy Quadrangle  Township 1 South, Range 5 East, Sections 31 & 32 of the Bull Run Quadrangle Proposed by: Bonneville Power Administration (BPA)

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Microsoft Word - Longview-WashWay Acquisition CX.docx  

Broader source: Energy.gov (indexed) [DOE]

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Acquisition of Cowlitz County Public Utility District's (CCPUD) 115-kV transmission line from BPA's Longview Substation to CCPUD's Washington Way Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Township 8 North, Range 3 West, Section 36, and Township 8 North, Range 2 West, Sections 31 and 32 in Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to acquire a 1.5 mile portion of CCPUD's existing Longview-Washington Way 115-kV transmission line in order to provide a parallel

182

Microsoft Word - CX_HamptonWindTap.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James L. Hall Project Manager - TPC-TPP-4 Proposed Action: Baseload Energy Inc. Brasada-Harney 115-kV Transmission Line Project Budget Information: 00221791 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions/modifications to electric power transmission facilities within previously developed areas. Location: Deschutes County, Oregon, T22S, R31E, Sec 10 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project is a result of an interconnection request that was made by Baseload Energy, Inc., to interconnect onto the Federal Columbia River Transmission System. This interconnection request would accommodate a High Altitude Wind

183

Microsoft Word - Cascade Networks Allston Substation LURR CX.doc  

Broader source: Energy.gov (indexed) [DOE]

15, 2011 15, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum Harold Grappe - TELP-TPP-3 Proposed Action: Cascade Networks, Inc. LURR at Allston Substation Budget Information: Work Order # 00275035 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.7 "Adding fiber optic cable to transmission structures..." Location: Section 10, Township 7 North, Range 3 West of the Delena Quadrangle located in Columbia County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to grant Cascade Networks, Inc. permission to

184

Microsoft Word - CX-Silver_Butte_28August2012.docx  

Broader source: Energy.gov (indexed) [DOE]

August 28, 2012 August 28, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: Silver Butte Fiber Burial Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B.47 Fiber Optic Cable. Location: Kootenai National Forest, Lincoln and Sanders County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to bury an approximately 1-mile-long overhead fiber optic line (fiber) segment located along the Noxon-Libby transmission line. Under the Proposed Action, the fiber would be buried within the BPA right-of-way (ROW) and a U.S. Forest Service (USFS) access road. Past snow and ice loading along the segment has resulted in

185

Microsoft Word - Central Ferry Fiber Project CX.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum Glen Van Bergen - TEP-TPP-3 Proposed Action: Central Ferry Fiber Project Budget Information: Work Order # 00223131, Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.7 "Adding fiber optic cable to transmission structures..." Location: Walla Walla, Columbia, and Garfield counties, WA  Township 12 North, Range 34 East, Section 3  Township 13 North, Range 38 East, Sections 28, 33-36  Township 13 North, Range 39 East, Sections 25-29. 31-33  Township 13 North, Range 40 East, Sections 11, 12, 14-16, 20, 21, 29, 30

186

Microsoft Word - CSKT_Lake_County_AcquisitionsCreek-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes (CSKT) for purchase of Lake County properties. Fish and Wildlife Project No.: 2002-003-00, Contract 49933 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

187

Microsoft Word - Peninsula_Light_Co_L0308_Mod_CX_and_EnvCkLt.doc  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel, Project Manager, TEP-TPP-1 Proposed Action: Peninsula Light Company Line and Load Interconnection Request L0308 (amendment to previous Categorical Exclusion issued on May 5, 2011) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.12 Construction of powerlines Location: Mason County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes a modification to a tap line that would interconnect Peninsula Light Company (PLC) into BPA's Shelton-Kitsap #2 115-kV transmission line in Mason County, WA. The original proposal involved constructing the tap within existing BPA right-of-way (ROW), as described in the categorical exclusion issued

188

Microsoft Word - CX-Harbour_Pointe_130621  

Broader source: Energy.gov (indexed) [DOE]

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Toni L. Timberman Project Manager - TSE-TPP-2 Proposed Action: Harbour Pointe Small Generator Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Mukilteo, Snohomish County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate UniEnergy Technologies' (UET) 1.5-megawatt battery generation project into BPA's balancing authority (BA) in response to a UET small generator interconnection request. The proposed point of interconnection is at Snohomish Public Utility District's (SnoPUD) Harbour Pointe Substation. In order to integrate

189

CX-008883.pdf  

Broader source: Energy.gov (indexed) [DOE]

4, 2012 4, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Virgil Lee Watts Project Manager - KEWM-4 Proposed Action: Indian Creek Property Funding. Fish and Wildlife Project No.: 1992-061-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Location: Pend Oreille County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the Kalispel Tribe of Indians' (Kalispel Tribe) purchase of a 556-acre parcel of land in Pend Oreille County, Washington. The Kalispel Tribe would own and manage the land and BPA would be granted a perpetual

190

Microsoft Word - Rocky Ridge_CX Memo .docx  

Broader source: Energy.gov (indexed) [DOE]

31, 2013 31, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Tripp Project Manager - TEP-CSB-1 Proposed Action: Rocky Ridge Radio Station Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meterological and radio towers Location: Powell County, Montana Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Rocky Ridge Radio Station located about 6 miles east of Garrison, Montana. The upgrade would involve replacing the existing analog communication system with a new digital communication system to ensure communication reliability. The site is located on Montana Department of Natural Resource Conservation land. Construction would be staged

191

Microsoft Word - Post_Skidoo_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

5, 2012 5, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Confederated Salish and Kootenai Tribes (CSKT) for purchase of Skidoo Creek, Post Creek, and Bird's Eye View properties Fish and Wildlife Project No.: 2002-003-00, contract 55869 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Locations: Skidoo Creek Property Township 23 North, Range 19 West, Section 22 Lake County, MT 112 Acres Post Creek Property Township 19 North, Range 19 West, Section 7 Lake County, MT 5 Acres Bird's Eye View Township 23 North, Range 18

192

Microsoft Word - 070711 Cosmo Specialty FibersBAASA_1_.doc  

Broader source: Energy.gov (indexed) [DOE]

July 7, 2011 July 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Melanie Jackson Transmission Account Executive - TSE-TPP-2 Proposed Action: Bonneville Power Administration (BPA) proposes to enter into a Balancing Authority Area Service Agreement (BAASA) with Cosmo Specialty Fibers, Inc. (CSF). Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Establishment and implementation of contracts, marketing plans, policies, allocation plans, or acquisition of excess electric power that does not involve: (1) the integration of a new generation resource, (2) physical changes in the transmission system beyond the previously developed facility area, unless the changes are themselves categorically excluded, or (3) changes in the normal operating

193

Microsoft Word - SouthTacoma_CX_Updated.docx  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad J. Hamel Project Manager, TEP-TPP-1 Proposed Action: South Tacoma-Frederickson Fiber Project (update to previous Categorical Exclusion issued on June 10, 2011) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 - Fiber Optic Cable Location: Pierce County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install fiber optic cable between BPA's South Tacoma Substation and the City of Tacoma's Frederickson Substation in Pierce County, Washington. The 1-mile long fiber optic cable would increase the reliability and redundancy of communications between the two substations. This project originally proposed a combination of overhead and buried

194

ORISE: Human Subjects Protection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Human Subjects Protection Human Subjects Protection The Oak Ridge Institute for Science and Education (ORISE) performs technical assessments to assist U.S. Department of Energy (DOE) laboratories involved in human subjects research projects. Under DOE Order and Policy 443.1A, Protection of Human Subjects, and 10 CFR 745, DOE employees and contractors are expected to protect the rights and welfare of human research subjects. In support of the DOE Office of Science and the Human Subjects Protection Program (HSPP), ORISE has most recently assisted with the development and distribution of tools to address classified research and to track potential human social cultural behavior systems (HSCB) research conducted by DOE laboratories. Examples of products that ORISE has developed in support of the HSPP

195

ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF EM Recovery NEWS FLASH RECOVERY.GOV March 10, 2011 American Recovery and Reinvestment Act Payments Surge Past $4 Billion U.S. Depar tment of Energy | Office of Environmental Management For More Information on EM Recovery Act Work, Visit Us on the Web: http://www.em.doe.gov/emrecovery/ FINANCIAL HIGHLIGHTS * More than $4 BILLION in Recovery Act payments are accelerating environmental cleanup * 67% of EM Recovery Act funds have been paid Financial data are based on reporting as of March 9, 2011, and are subject to change. EM has made more than $4 billion in Recovery Act payments, or 32 percent of the DOE's $12.4 billion in Recovery Act payments. DOE received $35.2 billion

196

ORISE: Protecting Human Subjects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

or performed by DOE employees, addresses the protection of human subjects. The Oak Ridge Institute for Science and Education (ORISE) supports DOE in its efforts to protect...

197

Geothermal Technologies Subject Portal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alike at: Introducing The Geothermal Technologies Subject Portal is sponsored by the Geothermal Technologies Program, DOE Energy Efficiency and Renewable Energy (EERE), and is...

198

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes Department of Energy (DOE) procedures and responsibilities for implementing the policy and requirements set forth in 10 Code of Federal Regulations (CFR) Part 745, Protection of Human Subjects; and in DOE P 443.1A, Protection of Human Subjects, dated 12-20-07. Cancels DOE O 443.1. Canceled by DOE O 443.1B.

2007-12-20T23:59:59.000Z

199

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish DOE procedures and responsibilities for implementing the policy and requirements set forth in 10 CFR Part 745, Protection of Human Subjects, ad in DOE P 443.1, Policy on the Protection of Human Subjects. Cancels DOE O 1300.3. Canceled by DOE O 443.1A.

2000-05-15T23:59:59.000Z

200

ENVIRONMENTAL ENGINEERING  

E-Print Network [OSTI]

ENVIRONMENTAL ENGINEERING UNDERGRADUATE HANDBOOK Cornell University Department of Biological and Environmental Engineering School of Civil and Environmental Engineering enve.cornell.edu 2013-2014 #12;Environmental Engineering 2013-2014 1 UNDERGRADUATE HANDBOOK FOR ENVIRONMENTAL ENGINEERING MISSION STATEMENT

Walter, M.Todd

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Document Type: Subject Terms  

E-Print Network [OSTI]

Title: Authors: Source: Document Type: Subject Terms: Abstract: Full Text Word Count: ISSN the department back on track. The action is to call a meeting of the team leaders and stress the urgency o

Major, Arkady

202

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Policy is to establish DOE-specific policy for the protection of human subjects involved in DOE research. Canceled by DOE P 443.1A.

2000-05-15T23:59:59.000Z

203

Protection of Human Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Policy is to establish DOE-specific principles for the protection of human subjects involved in DOE research. Cancels DOE P 443.1. Canceled by DOE O 443.1B

2007-12-20T23:59:59.000Z

204

MEMORANDUM FOR: FROM: SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

SUBJECT: SUBJECT: Department of Energy Washington, DC 20585 January 10, 2013 The General Counsel (GC-1) Patricia A. Hoffman ] Assistant Secretary Ofice of Electricity Delivery and Energy Reliability 2013 National Envirorunental Policy Act (NEPA) Annual Planning Summary Attached for your information is the NEP A Annual Planning Summary for FY 2013 for the Ofce of Electricity Delivery and Energy Reliability (OE). The Summary describes the status of

205

Environmental Programs Environmental Programs Committee  

E-Print Network [OSTI]

(Architecture) The Environmental Programs Committee coordinates courses and curricula on environmental topics. Wiesner (Civil and Environmental Engineering) Gordon G. Wittenberg (Architecture) #12;162 Environmental Programs Environmental Programs Committee Walter Whitfield Isle, Chair (English

Richards-Kortum, Rebecca

206

Facility Representative Program: Subject Matter Links  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Subject Matter Links Subject Matter Links Nuclear Office of Nuclear Safety and Environment Nuclear Regulatory Commission American Nuclear Society (ANS) Nuclear Energy Institute International Atomic Energy Agency (IAEA) Electrical OSHA Electrical Safety Information Underwriters Laboratories National Electrical Manufacturers Association Institute of Electrical and Electronic Engineers (IEEE) IPC - Association Connecting Electronics Industries OSHA Laser Hazards Chemical DOE Chemical Safety Program DOE Chronic Beryllium Disease Prevention Program EPA Chemical Information Material Safety Data Sheets Search NIOSH Guide to Chemical Hazards American Petroleum Institute Alternative Fluorocarbons Environmental Acceptability Study American Institute of Chemical Engineers Chemical Reactivity Worksheet

207

MEMORANDUM TO: FILE SUBJECT:  

Office of Legacy Management (LM)

SUBJECT: SUBJECT: -Li&$diM ---------- -2' ~~EI: ---- --------:------- CITY: %-k&&k/ -------------------------- ST&T& oi+ OWN_EM_SL Past : ---------------------A-- Current:___--~---____------_______ Owner contacted q yes anno; if yes, date contacted ------------- TYPE OF OPERATION ~_------_~~-----_ tJ Research & Development 0 Production scale tssting Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis 0 Production 0 Disposal/Storage @ ' Facility Type 0 Manufacturing a University 0 Research Organization -------- 0 Prime' 0 Subcontractor 0 Purchase Order q Other information (i.e., cost + fixed fee, unit price, time 81 material, etc) ------- ~_-----_------~-------~~~~~~ Contract/Purchase Order # ----------------------------

208

MEMORANDUM SUBJECT8  

Office of Legacy Management (LM)

SUBJECT8 SUBJECT8 CILTERNATE . N*MEt_--_-____-_____------- ---------STATE:- -- nm -------- pestr Current: ------------------------ -------------------------- Owner contacted 0 yes 0 no; if yes, datr contacted me---mm------ TYPE OF OPERATION ----------------- P esearch & Development cl Facility Type 0 Production scale testing 2s c] tlanufacturinq Pilot Scale 0 University w Bench Scale Process 0 Research Organization 0 Theoretical Studies 0 Government Sponsored Facility 0 Sample 81 Analysis a Other . --------------------- D Production Cl Disposal /Storage TYPE OF CONTRCSCT -------w---e---- 0 Subcontractor ' 0 Purchase Order 0 Other information (i.e., cost + fixed fee, unit price, time 81 material, l tc) ------- ---------------------we-em ---------------------------

209

Environmental Stewardship  

E-Print Network [OSTI]

Environmental Stewardship Environmental Stewardship #12;Organizational Opportunities or Threats Environmental StewardshipEnvironmental Stewardship #12;ADOT Organizational StructureADOT Organizational of safety and efficiency, while retaining and promoting its irreplaceable natural landscape and protecting

Minnesota, University of

210

Incorporating Biodiversity Considerations Into Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Incorporating Biodiversity Considerations Into Environmental Impact Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA This Council on Environmental Quality (CEQ) report is intended to provide background on the emerging, complex subject of biodiversity, outline some general concepts that underlie biological diversity analysis and management, describe how the issue is currently addressed in NEPA analyses, and provide options for agencies undertaking NEPA analyses that consider biodiversity. Council on Environmental Quality: Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act More Documents & Publications Habitat Evaluation: Guidance for the Review of Environmental Impact

211

Incorporating Biodiversity Considerations Into Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Incorporating Biodiversity Considerations Into Environmental Impact Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under NEPA This Council on Environmental Quality (CEQ) report is intended to provide background on the emerging, complex subject of biodiversity, outline some general concepts that underlie biological diversity analysis and management, describe how the issue is currently addressed in NEPA analyses, and provide options for agencies undertaking NEPA analyses that consider biodiversity. Council on Environmental Quality: Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act More Documents & Publications Habitat Evaluation: Guidance for the Review of Environmental Impact

212

SUBJECT: National Nuclear Security Administration  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration Sandia Site Ofce P. 0. Box 5400 Albuquerque, NM 87185 JAN O=P= ONP= Annual National Environmental Policy Act Planning Sumary 2013 Attached is: the Annual National Environmental Policy Act (NEPA) Planning Summary for the National Nuclear Security Administation, Sandia Site Ofce (SSO). Currently, there are two environmental assessments planned and one environmental impact statement in progess for the

213

MEHORANDUfl TO: FILE SUBJECT:  

Office of Legacy Management (LM)

MEHORANDUfl MEHORANDUfl TO: FILE ------_____ SUBJECT: OWNER (S) -----_-- Post:-------_-------_________ current: ---------_---------_______ Owner contacted 0 yes Qnna; if yes, date contacted -------_--___ TYPE OF OPERATION ~~~---~~_-----__- 0 Research & Develapment x Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Pkoces;s i ,Theoretical Studies Sample & Analysis 0 Manufacturing 0 University 0 Research Drganizaticn 0 Government Sponsored Facility & other &ded-S~AWe-- c Production 0 Di cposal /Storage TYPE OF CONTRACT ---------------- 5 Prime 0 Q Subcontract& -$JJ$~~~$~~' ~~*' - T04' L Other information (i.e., cost + fixed fee, unit price, 0 Purchase Order time 81 material, qtr) ------- _----__------_---__--------- Cantract/Purkhaae Order #-@ -'

214

Item Subject FAR Case  

Broader source: Energy.gov (indexed) [DOE]

Federal Acquisition Circular (FAC) 2005-53 Item Subject FAR Case I. Equal Opportunity for Veterans 2009-007 II. Unique Procurement Instrument Identifier 2009-023 III. Uniform Suspension and Debarment Requirement 2009-036 IV. Extension of Sunset Date for Protests of Task and 2011-015 Delivery Orders V. Encouraging Contractor Policies to Ban Text Messaging 2009-028 While Driving. VI. TINA Interest Calculations 2009-034 Item I--Equal Opportunity for Veterans (FAR 2009-007) The interim rule, published September 29, 2010, is adopted as final with minor changes. A definition from the clause at FAR 52.222-35 for ``executive and senior management'' is added to FAR subpart 22.13. The interim rule implemented Department of

215

To: From: Subject:  

Gasoline and Diesel Fuel Update (EIA)

To: To: From: Subject: Department of Energy Washington, DC 20585 May 8, 2013 Rebecca Peterson U.S . Energy Information Administration Patricia A. Hoffman @tJ- Assistant Secretary Office of Electricity Delivery and Energy Reliability Office of Electricity Delivery and Energy Reliability (OE) Comments on proposal to create EIA-930 Thank you for the opportunity to provide comments on the proposed U.S . Energy Information Administration (EIA) forms to go into effect in 2014. In particular we would like to offer comments on the newly proposed EIA-930, Balancing Authority Operations Report. We strongly support EIA's proposal to collect hourly information on actual transmission system utilization. We further encourage EIA to make the majority of these data publicly available, possibly on a different schedule than is proposed in

216

DATE: TO: FROM: SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

217

SUBJECT: OWNER(S)  

Office of Legacy Management (LM)

HEHORANDUH HEHORANDUH ;;&; DC&b ------w--v SUBJECT: OWNER(S) -------- P1st a Owner contrctmd TYPE OF OPERATION ----------------- 0 Research I Development 0 Facility Type 0 Production scale testing 0 Pilot Scrlr 0 Bench Seal0 Procemm 0 Theoretical Studier 0 Sample & Anrlyri l 0 Production x Dimpomrl/Storrgr 0 Hmufrcturing 0 University 0 Rmsmarch Organization 0 Government Sponmored Facility 0 Other -II---------------- TYPE OF CONTRACT ----u---------- 0 d ime Subcontract& 0 Purchrre Order 0 Other information (i.e., comt -w-e--- Contrrct/Purchrsa Order 0 CONTRACTING PERIOD: ------------------ . OWNERSHIPa AEC/HED OWNED m---w LANDS 0 BUILDINSS 0 EQUIPMENT 0 ORE OR RAW HA-I-L 0 FINAL PRODUCT q WASTE & RESIDUE 0 AEC/HED LEASED ---w-w E 0 0

218

Environmental Analysis  

Broader source: Energy.gov [DOE]

Environmental Analysis is used by the Program to quantify the environmental impacts of hydrogen technologies. Specifically, life cycle assessment is used to identify and evaluate the emissions,...

219

Environmental Participation and Environmental Motivation  

E-Print Network [OSTI]

why do people act environmentally and what are the barriersWillingness to pay for environmental protection in Germany:are more likely to be environmentally engaged. However, the

Torgler, Benno; Garca-Valias, Mara A.; Macintyre, Alison

2009-01-01T23:59:59.000Z

220

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

Sciences and Ecology Sciences and Ecology Go to Research Groups Preprints Provided by Individual Scientists: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abella, Scott R. (Scott R. Abella) - School of Life Sciences, University of Nevada at Las Vegas Abouheif, Ehab (Ehab Abouheif) - Department of Biology, McGill University Abrams, Marc David (Marc David Abrams) - School of Forest Resources, Pennsylvania State University Acevedo, Alejandro (Alejandro Acevedo) - Department of Biology, Western Washington University Achenbach, Laurie A. (Laurie A. Achenbach) - Department of Microbiology, Southern Illinois University Achter, Jeff (Jeff Achter) - Department of Mathematics, Colorado State University Acosta, Charles A. (Charles A. Acosta) - Department of Biological

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

S S T U V W X Y Z Sayre, Richard (Richard Sayre) - Department of Plant Cellular and Molecular Biology, Ohio State University Schiff, Eric A. (Eric A. Schiff) - Department of Physics, Syracuse University Scofield, John H. (John H. Scofield) - Department of Physics and Astronomy, Oberlin College Singh, Pritpal (Pritpal Singh) - Department of Electrical and Computer Engineering, Villanova University Sites, James R. (James R. Sites) - Department of Physics, Colorado State University Southern Methodist University (Southern Methodist University - Department of Earth Sciences) - Department of Earth Sciences, Geothermal Laboratory Go back to Individual Researchers Collections: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Stanford University - Department of Energy Resources Engineering,

222

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

B C D E F G H I J K L M N O P Q R S B C D E F G H I J K L M N O P Q R S T U V W X Y Z Bak, Claus Leth (Claus Leth Bak) - Department of Energy Technology, Aalborg University Bak-Jensen, Birgitte (Birgitte Bak-Jensen) - Department of Energy Technology, Aalborg University Baldick, Ross (Ross Baldick) - Department of Electrical and Computer Engineering, University of Texas at Austin Barfuss, Steven L. (Steven L. Barfuss) - Utah Water Research Laboratory, Utah State University Bialek, Janusz W. (Janusz W. Bialek) - School of Engineering and Electronics, University of Edinburgh Blumsack, Seth (Seth Blumsack) - Department of Energy and Mineral Engineering, Pennsylvania State University Go back to Individual Researchers Collections: A B C D E F G H I J K L M N O P Q R S

223

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

E F G H I J K L M N O P Q R S E F G H I J K L M N O P Q R S T U V W X Y Z Damery, David T. (David T. Damery) - Department of Natural Resources Conservation, University of Massachusetts at Amherst Davis, Adam (Adam Davis) - Department of Crop Sciences, University of Illinois at Urbana-Champaign de Bie. Kees (International Institute for Geo-Information Science and Eartde Bie. Kees - Department of Natural Resources) - Department of Natural Resources, International Institute for Geo-Information Science and Earth Observation, Universiteit Twente Deng, Xunming (Xunming Deng) - Department of Physics and Astronomy, University of Toledo Doebley, John (John Doebley) - Department of Medical Genetics, University of Wisconsin at Madison Duffy, Michael D. (Michael D. Duffy) - Office of Biorenewables

224

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

D E F G H I J K L M N O P Q R S D E F G H I J K L M N O P Q R S T U V W X Y Z Cao, Quang V. (Quang V. Cao) - School of Renewable Natural Resources, Louisiana State University Chaudhary, Sanjay (Sanjay Chaudhary) - Department of Energy Technology, Aalborg University Chee-Sanford, Joanne (Joanne Chee-Sanford) - Department of Crop Sciences, University of Illinois at Urbana-Champaign Chen, Wilfred (Wilfred Chen) - Department of Chemical and Biomolecular Engineering, University of Delaware Chen, Zhe (Zhe Chen) - Department of Energy Technology, Aalborg University Connor, Peter M. (Peter M. Connor) - Camborne School of Mines, University of Exeter in Cornwall Go back to Individual Researchers Collections: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

225

Browse by Discipline -- E-print Network Subject Pathways: Environmental  

Office of Scientific and Technical Information (OSTI)

X Y Z X Y Z Walker, Geoff (Geoff Walker) - School of Information Technology and Electrical Engineering, University of Queensland Wang, Chao-Yang (Chao-Yang Wang) - Electrochemical Engine Center, Pennsylvania State University Wood, Thomas K. (Thomas K. Wood) - Department of Chemical Engineering, Pennsylvania State University Wu, Chenye (Chenye Wu) - Institute for Interdisciplinary Information Sciences, Tsinghua University Wu, Junqiao (Junqiao Wu) - Department of Materials Science and Engineering, University of California at Berkeley Wurtele, Eve Syrkin (Eve Syrkin Wurtele) - Department of Genetics, Development and Cell Biology, Iowa State University Go back to Individual Researchers Collections: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

226

Why study Ecological and Environmental Sciences at  

E-Print Network [OSTI]

and ecological management or environmental science; or alternatively maintain a broad mix of subject choices, land use and water resources and environmental modelling. Recent graduates have followed careers Sciences with Management This degree programme provides the opportunity for Ecological and Environmental

Schnaufer, Achim

227

Environmental Microbiology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Microbiology Environmental Microbiology Environmental Microbiology Los Alamos working to identify genetic regulatory systems in single microorganisms. Get Expertise Cheryl Kuske DOE BER Biological System Science Division Program Manager Email Srinivas Iyer Bioscience Group Leader Email Rebecca McDonald Bioscience Communications Email Examining the soil beneath our feet Environmental microbiology Read caption + Many environmental molecular biology studies begin with purified DNA and RNA extracted from the soil. Overview of Research and Highlights Learning about microorganisms-bacteria, algae, and fungi-is essential to understanding how living things interact with their environments. Exploration of environmental microbiology at Los Alamos crosses broad scales of investigation that span from identification of genetic regulatory

228

Environmental Assessments  

Broader source: Energy.gov [DOE]

The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPOs due diligence process for issuing a...

229

Agricultural Environmental  

E-Print Network [OSTI]

Agricultural Policy / Environmental eXtender Model Theoretical Documentation Version 0806 December 2012 #12;2 Agricultural Policy/Environmental eXtender Model Theoretical Documentation Version 0806 J............................................................................................................................. 11 Air Temperature and Solar Radiation

230

Agricultural Environmental  

E-Print Network [OSTI]

Agricultural Policy / Environmental eXtender Model Theoretical Documentation Version 0604 BREC Report # 2008-17 June 2008 #12;2 Agricultural Policy/Environmental eXtender Model Theoretical............................................................................................................................. 11 Air Temperature and Solar Radiation

231

Environmental Justice  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in...

232

Environmental Justice  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations.

233

ENVIRONMENTAL ENGINEERING  

E-Print Network [OSTI]

engineering covers a wide range of critical services, from designing water and wastewater treatment facilitiesENVIRONMENTAL ENGINEERING www.cee.pdx.edu What do environmental engineers do? Civil and Environmental Engineering (CEE) is an exciting, challenging, and dynamic field that is critical to our quality

234

ORISE: Protecting Human Subjects Website  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

provide protection with respect to the rights and welfare of research subjects. The Oak Ridge Institute for Science and Education (ORISE) administers the Oak Ridge Sitewide...

235

(Environmental technology)  

SciTech Connect (OSTI)

The traveler participated in a conference on environmental technology in Paris, sponsored by the US Embassy-Paris, US Environmental Protection Agency (EPA), the French Environmental Ministry, and others. The traveler sat on a panel for environmental aspects of energy technology and made a presentation on the potential contributions of Oak Ridge National Laboratory (ORNL) to a planned French-American Environmental Technologies Institute in Chattanooga, Tennessee, and Evry, France. This institute would provide opportunities for international cooperation on environmental issues and technology transfer related to environmental protection, monitoring, and restoration at US Department of Energy (DOE) facilities. The traveler also attended the Fourth International Conference on Environmental Contamination in Barcelona. Conference topics included environmental chemistry, land disposal of wastes, treatment of toxic wastes, micropollutants, trace organics, artificial radionuclides in the environment, and the use biomonitoring and biosystems for environmental assessment. The traveler presented a paper on The Fate of Radionuclides in Sewage Sludge Applied to Land.'' Those findings corresponded well with results from studies addressing the fate of fallout radionuclides from the Chernobyl nuclear accident. There was an exchange of new information on a number of topics of interest to DOE waste management and environmental restoration needs.

Boston, H.L.

1990-10-12T23:59:59.000Z

236

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY ATLANTA FEDERAL CENTER  

E-Print Network [OSTI]

Number 2001-10096 Subject: COE Regulatory Final Environmental Impact Statement (FEIS) for "PCS Phosphate) regulatory Final Environmental Impact Statement (FEIS). This FEIS evaluates the environmental consequencesUNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET

Demers, Nora Egan

237

BIGHORN SHEEP: SUPPLEMENTAL ANALYSIS TO THE FOREST PLAN ENVIRONMENTAL...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

meeting Page 1 of 1 HEALTH SAFETY & ENVIRONMENTAL PROTECTION COMMITTEE - 3 MONTH WORK PLAN (SUBJECT TO REVISION) June Committee meeting: No committee meeting requested. Committee...

238

BIGHORN SHEEP: SUPPLEMENTAL ANALYSIS TO THE FOREST PLAN ENVIRONMENTAL...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Call Page 1 of 1 HEALTH SAFETY & ENVIRONMENTAL PROTECTION COMMITTEE - 3 MONTH WORK PLAN (SUBJECT TO REVISION) July Committee meeting: No July committee meetings Committee call...

239

SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

most most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. INITIATED BY: [Insert Office] NO. OF PAGES/ATTACHMENTS: 2 pages, 0 attachment Summary of Changes to Policy 450.8 Environment, Safety, and Health Revised Version Issued as Policy 450.9 LM Policy 450.8 Environment, Safety, and Health of 05/29/09, has undergone minor revisions. This Policy has been revised to include a new Executive Order and make revisions for updated DOE Orders that LM abides by. Please replace LM Policy 450.8 with LM Policy 450.9.

240

Subject:  

Broader source: Energy.gov (indexed) [DOE]

0 0 ERRATA SHEET STANDARD RESEARCH SUBCONTRACT (EDUCATIONAL INSTITUTION OR NONPROFIT ORGANIZATION) Page 1. Header Information: Delete open parentheses after Phone #: and after Fax #: Page 1. Paragraph 2. Second sentence, add "(Appendix A)" after the word Provisions. In the third sentence, delete misspelled word "supercede" and replace with "supersede." Page 2. Change date to read "August 2010" throughout document. SCHEDULE OF ARTICILES, Article 1. Statement of Work: 1. Page 3, Paragraph 1, revise to read: "The Subcontractor shall perform certain research and develop work identified as "___," dated___, and more fully described in the

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in those parameters while in EDA H-mode, we intend to use the plasma current and the ICRF input power as our primary knobs. 4. Resources 4.1 Machine and Plasma Parameters Give...

242

SUBJECT:  

Energy Savers [EERE]

Act and the Prohibited Personnel Practices. A DOECAST was disseminated on April 24, 2013 informing the DOE workforce about the Non-Disclosure Policies, Forms and Agreements,...

243

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that will be tested with these experiments is the ability for minority ions heated by cyclotron waves to screen heavy impurities from the core. Localized heating leads to large...

244

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and recovery at ITER fields without fueling and external momentum input using Ion Cyclotron Resonance Heating (ICRH). 2. Background and goals Discuss Physics Basis of the...

245

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

attenuator (VVA) will be inserted between the LH master oscillator and the klystron drive electronics. This May 30, 2014 2 will modulate the power level roughly evenly on all...

246

Subject:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Previous operational experience indicates the need to set the Coupler Protection System (CPS) during operation into the machine. Some power conditioning will be required...

247

Environmental Microbiology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Microbiology Environmental Microbiology Examining the soil beneath our feet Read caption + Many environmental molecular biology studies begin with purified DNA and RNA extracted from the soil. Overview of Research and Highlights Learning about microorganisms-bacteria, algae, and fungi-is essential to understanding how living things interact with their environments. Exploration of environmental microbiology at Los Alamos crosses broad scales of investigation that span from identification of genetic regulatory systems in single microorganisms to comprehensive studies of the complex microbial communities resident in soil, water and air. The long term goals of this research are to understand microbial processes and interactions, and the genomic traits underlying these activities, toward:

248

Environmental Stewardship  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

businesses for environmental work The companies chosen are Terranear PMC, Navarro Research and Engineering, Inc. and Portage, Inc - 92313 Los Alamos National Laboratory sits...

249

Environmental Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental-Review Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

250

EMSL - environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

environmental en Diffusional Motion of Redox Centers in Carbonate Electrolytes . http:www.emsl.pnl.govemslwebpublicationsdiffusional-motion-redox-centers-carbonate-electrolyte...

251

MEMORANDUM FOR DISTRIBUTION FROM: SUBJECT:  

Office of Environmental Management (EM)

EE-I Huizenga, David G.; Senior Advisor, Office of Environmental Management, EM-I Smith, Chris; Acting Assistant Secretary, Office of Fossil Energy, FE- I Geiser, David W.;...

252

Subject Access to Your Information  

E-Print Network [OSTI]

Subject Access to Your Information Sandy Tucker Texas A&M University Libraries August 1, 2006 Second International Symposium on Transportation Technology Transfer Introduction You have packages ? books, pamphlets, files, electronic documents. You... have records of packages ? cards or an online database. Other? We?re talking about adding subject information to the records of packages. Specifically, we?ll talk about using a ?controlled vocabulary.? Controlled Vocabulary Using a fixed list...

Tucker, Sandra

2006-08-01T23:59:59.000Z

253

Protection of Human Research Subjects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes Department of Energy (DOE) procedures and responsibilities for implementing the policy and requirements set forth in Title 10 Code of Federal Regulations (CFR) Part 745, Protection of Human Subjects, 45 CFR Part 46, and the Secretarial Policy Memorandum on Military or Intelligence-Related Human Subject Research, December 9, 2009. Cancels DOE O 443.1A and DOE P 443.1A.

2009-12-09T23:59:59.000Z

254

Environmental Engineering  

E-Print Network [OSTI]

and human origins. Civil and Environmental Engineers create, con- struct, and manage the infrastructure water and air pollution as well as industrial and hazardous waste management. They monitor the quality, construc- tion, transportation, environmental engineering, and water resources. The Structural Engineering

Wang, Hai

255

Training Program Environmental Health & Safety  

E-Print Network [OSTI]

Training Program Overview Environmental Health & Safety VISION STATEMENT We provide expert guidance University Medical Center 212-854-8749 Morningside Campus 212-854-8749 Introduction Training&S offers a wide range of training programs, presented by subject matter experts in multiple formats

Jia, Songtao

256

Environmental Impacts of Treated Wood  

E-Print Network [OSTI]

Environmental Impacts of Treated Wood 6495_C000.fm Page iii Wednesday, February 1, 2006 5:48 PM #12 associated with treated wood. Bill Hinkley died on September 12, 2005, shortly before the completion received contributions from many of the world's leading scientists on the subject of treated wood, and we

Florida, University of

257

Environmental Surveillance - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Monitoring The MSA project conducts environmental monitoring to measure radionuclide concentrations in various environmental media, including air, surface water,...

258

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

259

Environmental Intelligence  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Intelligence Intelligence Answering big questions about environmental change begins with many small measurements (continued on next page) NEWSLETTER OF Oak Ridge National Laboratory's Energy and Environmental Sciences Directorate E nvironmental intelligence is the wealth of information on the physical, biological, and chemical processes that drive Earth's ecosystems (its organisms, soil, air, and water) and the impact humans have on these ecosystems through our practices and developments. Such intelligence is often gathered though small, precise efforts to monitor complex environmental processes with sensing and measurement systems. By collecting new or more detailed observational data from a greater number of locations across the globe, researchers can improve scientific

260

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

9 9 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee June 2011 U.S. Department of Energy Oak Ridge Office This page intentionally left blank. DOE/EA-1779 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Date Issued-June 2011 Bechtel Jacobs Company, LLC and CDM Federal Services Inc. contributed to the preparation of this document and may not be considered for review of the document U.S. Department of Energy Office of Environmental Management This page intentionally left blank. iii CONTENTS FIGURES......................................................................................................................................................

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

262

Environmental Sustainability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environment » Environment » Environmental Stewardship » Environmental Sustainability /community-environment/_assets/images/icon_earthday.jpg Environmental Sustainability: Creating the Future Exercising our commitment to operating a sustainable site by creating a 50-year horizon of planning and preparing for effective environmental stewardship while executing national mission. Sustainability Goals» Recycling» Green Purchasing» Pollution Prevention» Reusing Water» Feature Stories» LOOK INTO LANL - highlights of our science, people, technologies close Novel cellulose structure requires fewer enzymes to process biomass to fuel Improved methods for breaking down cellulose nanofibers are central to cost-effective biofuel production. READ MORE An enzyme (shown in blue) pulls out individual cellulose chains (pink) from the pretreated nanofiber surface (green) and then breaks them apart into simple sugars. Image credit, Shishir Chundawat, Great Lakes Bioenergy Research Center.

263

Environmental Monitoring  

Science Journals Connector (OSTI)

Cell processing facilities should implement and maintain a program of environmental monitoring regardless of whether product manufacturing occurs in an unclassified laboratory space or in a Class 10,000 cleanroom

A. Gee MI Biol; PhD; D.L. Lyon MT (ASCP); CLSp (MB)

2009-01-01T23:59:59.000Z

264

Environmental decontamination  

SciTech Connect (OSTI)

The record of the proceedings of the workshop on environmental decontamination contains twenty-seven presentations. Emphasis is placed upon soil and surface decontamination, the decommissioning of nuclear facilities, and assessments of instrumentation and equipment used in decontamination. (DLS)

Cristy, G.A.; Jernigan, H.C. (eds.)

1981-02-01T23:59:59.000Z

265

Environmental Engineering  

E-Print Network [OSTI]

University, 1989 Selected Recent Publications "Reverse Osmosis Biofilm Dispersal by Osmotic Back Retarded Osmosis Energy Production from Natural Salinity Gradients." Environmental Science & Technology, 2013. "A Forward Osmosis-Membrane Distillation Hybrid Process for Direct Sewer Mining: System

Elimelech, Menachem

266

Incorporating Biodiversity Considerations into Environmental Impact Analysis under NEPA  

Broader source: Energy.gov (indexed) [DOE]

Incorporating Biodiversity Considerations Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act Incorporating Biodiversity Considerations Into Environmental Impact Analysis Under the National Environmental Policy Act CouncilonEnvironmental Quality Executive Officeof thePresident 722Jackson Place, NW Washington, DC 20503 January 1993 This report presents the results of consultations by the Council on Environmental Quality (CEQ) concerning the consideration of biological diversity in analyses prepared under the National Environmental Policy Act (NEPA). This report is intended to provide background on the emerging, complex subject of biodi- versity, outline some general concepts that underlie biological diversity analysis and man-

267

Environmental Studies An Overview  

E-Print Network [OSTI]

and Water Conservation Environmental Education Environmental Communications Water Quality Management Air water supplies, and reclaim contaminated land and water to comply with federal environmental regulationsEnvironmental Studies An Overview Environmental scientists conduct research to identify and abate

Colorado at Boulder, University of

268

Environmental Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

269

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

270

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

271

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

682 682 Environmental Assessment Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 U.S. Department of Energy Richland, Washington Environmental Assessment February 20 10 DOE/EA- 1682 This page intentionally left blank. 1 February 20 10 DOE/EA- 1682 TABLE OF CONTENTS 1.0 INTRODUCTION..............................................................................1. 1.1 BACKGROUND ......................................................................... 3 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ......................... 6 1.3 NEPA REQUIREMENTS............................................................... 6 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE ....................... 8

272

Research Using Human Subjects/Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Using Human SubjectsMaterials (taken in part from "Research on Human Specimens", National Institutes of Health) A 'human subject' is a living individual about whom an...

273

Environmental Management  

SciTech Connect (OSTI)

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2014-11-12T23:59:59.000Z

274

Environmental Management  

ScienceCinema (OSTI)

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2015-01-07T23:59:59.000Z

275

Environmental Sustainability  

E-Print Network [OSTI]

Energy Systems & Climate Change 21 3.2 Communication 24 #12;Prospectus for Environmental Sustainability: Distance Learning 2014-2015 3 MEEN40820 Technical Communications 24 IS40030 People Information & Communication 26 ENVB40380 Managing the Interface between Science & Policy 28 3.3 Resource Characterisation

276

Environmental Sustainability  

E-Print Network [OSTI]

Energy Systems & Climate Change 21 3.2 Communication 24 #12;Prospectus for Environmental Sustainability: Distance Learning 2013-2014 3 MEEN40820 Technical Communications 24 IS40030 People Information & Communication 26 ENVB40380 Managing the Interface between Science & Policy 28 3.3 Resource Characterisation

277

Aligning National Environmental Policy Act Process with Environmental...  

Broader source: Energy.gov (indexed) [DOE]

Aligning National Environmental Policy Act Process with Environmental Management Systems Aligning National Environmental Policy Act Process with Environmental Management Systems...

278

Q MEtlORANDUM SUBJECT:  

Office of Legacy Management (LM)

Q Q , MEtlORANDUM SUBJECT: --m--w OWNER(S) ------Be PIIt a Current: ------------------------ -------------------------- Owner contacted 0 yes 0 no; if yer, date contacted ------------- TYPE OF OPERATION ----------------- wesearch & Dove1 opment s Facility Type 0 Production acalr testing e Pilot Scale 6 Bench Scale Process 0 Theoretical Studies - 0 Sample & Analysis s tlmufacturing 0 University (J Research Organization 0 Government Sponsored Facility 0 Other. --------------------- 0 Production 0 Disposal /Storage TYPE OF CONTRACT ---------------- 0 Other information (i-h., cost + fixed fee, unit price, time 81 material, l tc) -we---- dI- ,~~_73 --------------------------- ---------------------------- Contract/Purchase Order 4+/ ------------------

279

Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts...

280

RMOTC - Library - Environmental Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Documents The U.S. Department of Energy National Environmental Policy Act (NEPA) requires careful consideration of the potential environmental consequences of all...

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

HUD's Environmental Review Training  

Broader source: Energy.gov [DOE]

An environmental review is the process of reviewing a project and its potential environmental impacts to determine whether it meets federal, state, and local environmental standards. The...

282

Review: Wicked Environmental Problems  

E-Print Network [OSTI]

Bauer, ed. Forging Environmentalism (2006). Regardless ofby reading Wicked Environmental Problems as they participateReview: Wicked Environmental Problems: Managing Uncertainty

Jenkins, David

2012-01-01T23:59:59.000Z

283

Subject: Cost and Price Analysis  

Broader source: Energy.gov (indexed) [DOE]

No. AL-2009-03 Revision 1 No. AL-2009-03 Revision 1 Acquisition Regulation Date July 9, 2010 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Procurement Executives. Subject: Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning References: FAR Subpart 6.1 Full and Open Competition FAR Subpart 6.3 Other than Full and Open Competition FAR Part 7 Acquisition Planning FAR Part 34 Major System Acquisition DEAR Subpart 917.6 Management and Operating Contracts DEAR 970.1706-1 Award, Renewal, and Extension Acquisition Guide Chapter 7.1, Acquisition Planning Acquisition Guide Chapter 42.5, Contract Management

284

Subject: Cost and Price Analysis  

Broader source: Energy.gov (indexed) [DOE]

No. AL-2009-03 No. AL-2009-03 Acquisition Regulation Date 12/23/08 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Procurement Executives. Subject: Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning References: FAR Subpart 6.1 Full and Open Competition FAR Subpart 6.3 Other than Full and Open Competition FAR Part 7 Acquisition Planning FAR Part 34 Major System Acquisition DEAR Subpart 917.6 Management and Operating Contracts DEAR 970.1706-1 Award, Renewal, and Extension Acquisition Guide Chapter 7.1, Acquisition Planning Acquisition Guide Chapter 42.5, Contract Management Planning When is this Acquisition Letter (AL) effective?

285

MEMORANDU TO: FILE FHOM: SUBJECT:  

Office of Legacy Management (LM)

' .- _. I _ ' ' .- _. I _ ' 1.3 7 -3 , MEMORANDU TO: FILE FHOM: SUBJECT: Curre"t: Ll&k&&d ________ l- ; if yes, date contacted ___ 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample & Analysis 0 Production 0 Disposal /Storage TYPE OF CONTRACT --------------_- 0 Prime 13 Subcontract& 0 Purchase Order 0 Cl Facility Type 0 Manufacturing 0 University 0 Research Organization *i Government Sponsored Facility 0 Other --------------_-----_ Other information (i.e., cost + fixed fee, unit price, time & material, qtc) --------------------~~------ OWNERSHIP: AEC/UED AEWUED GOUT GOUT CONTRACTOR CONTRACTOR OWN!3 LEAS!32 @!NE_D LEEsE_n OWNED --_----___ --LEEEI) LANDS D 0 BUILDINGS EQUIPMENT : : cl 0

286

TO: FILE FROM: I SUBJECT:  

Office of Legacy Management (LM)

TO: FILE TO: FILE FROM: I .- SUBJECT: 9EEEW Pos$:&&~ rk/ErvlK& @orzb Current: Lov?r_ &%2J*l&o3?fi; Owner contacted 0 yes &no; if yes, date contacted . TYPE OF OPERATION ----------------- q Research & Development @ Facility Type 0 Production scale testing 0 Pilot Scale & rlanuf acturing 0 Bench Scale Process 0 University 0 Theoretical Studies 0 Research Organizatil 0 Sample SC Analysis 0 Government Sponsarec 0 Other -------------_ q Production 0 Disposal /Storage TYPE CIF CONTRACT ~------_~-~----_ q Prime 0 0 Subcontract& Other information (i.e. 0 Purchase Order + fixed fee, unit prier time 81 material, t+tc:)-- ------------w-----z-. Contract/Purchase Order #-&)A (c& YJ c -7 / -t 4,&>~c-~7~7------ --- -7

287

Council on Environmental Quality - Guidance for Environmental...  

Open Energy Info (EERE)

Guidance for Environmental Assessments of Forest Health Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: Council on Environmental Quality -...

288

B.S. in Environmental Sciences p.1 BACHELOR OF SCIENCE  

E-Print Network [OSTI]

B.S. in Environmental Sciences p.1 BACHELOR OF SCIENCE IN ENVIRONMENTAL SCIENCE An interdisciplinary major in the WSU College of Liberal Arts and Sciences The Environmental Science Program combines to the subject. It is the only undergraduate Bachelor of Science degree program addressing environmental issues

Berdichevsky, Victor

289

Name___________________________________________________________________________________ Subject Categories The dissertation database is arranged by subject categories. Please select the one subject which most nearly describes  

E-Print Network [OSTI]

Categories The dissertation database is arranged by subject categories. Please select the one subject which . . . . . . . . . . 0729 Art History . . . . . . . . . . 0377 Cinema . . . . . . . . . . . . . 0900 Dance and Counseling . .0519 Health . . . . . . . . . . . . . . .0680 Higher . . . . . . . . . . . . . . .0745 History

Northern British Columbia, University of

290

Environmental Management System Plan  

E-Print Network [OSTI]

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNLs approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

291

Environmental Standardization for Sustainability  

E-Print Network [OSTI]

Environmental Standardization for Sustainability by Professor John W. Bagby College of Information that environmental controls are expressed as environmental standards, a traditional driver of investment in pollution control. Environmental standards spur investment in green technologies that promise to stimulate

Bagby, John

292

Environmental Policy and Assistance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Protection, Sustainability Support & Corporate Safety Analysis HS-20 Home Mission & Functions » Office of Nuclear Safety, Quality Assurance & Environment » Sustainability Support » Environmental Policy & Assistance » Corporate Safety Programs » Analysis Program Contacts What's New? Sustainability Support Environment Corporate Safety Programs Analysis Environment Environmental Policy Environmental Guidance Environmental Reports Environmental Management System Radiation Protection Environmental Compliance Environmental Justice Environmental Training Environmental Tools Search Our Documents Topics & Resources Air Analytical Services Program CERCLA Cultural & Natural Resources DOE Comments on Rulemakings Federal Environmental Laws

293

Center for Environmental Biotechnology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current Projects Hydroecological Engineering Advanced Decision Support (HEADS) The HEADS research group has established a strong track record in the rapidly growing, new subject area of Ecological Engineering. The term hydroecological engineering signifies the group's concentration on water resources and wastewater engineering. Recognizing the growth in the field of environmental informatics and the application of computer-based models in the development of decision support systems, the group is active in this niche area. Interest in decision support interfaces well with the group's expertise in the deployment of real-time flow and water quality sensors, rapid laboratory assessment techniques, and mathematical models to develop an early warning system for contaminant management and containment.

294

Faculty of Science: ENVIRONMENTAL PROGRAMMES  

E-Print Network [OSTI]

Industrial Water and Wastewater Inspector Environmental Technologist Restorative Biologist Environmental Economist GIS Analyst Environmental Project Manager Environmental Training Specialist www.environmentalFaculty of Science: ENVIRONMENTAL PROGRAMMES Possible Careers Environmental Planner Hazardous

Brownstone, Rob

295

FIELDS OF STUDY, SUBJECTS AND CONCENTRATIONS  

E-Print Network [OSTI]

graphics building technology and environmental science Architecture [M.Arch. professional] architecture applied econometrics and quantitative analysis economics of development environmental management (M Resource Economics [M.S., Ph.D., M.P.S.(A.L.S.)] environmental economics resource economics APPLIED

Keinan, Alon

296

Federal Acquisition Circular 2005-52 Item Subject FAR case  

Broader source: Energy.gov (indexed) [DOE]

Circular 2005-52 Circular 2005-52 Item Subject FAR case I Sustainable Acquisition 2010-001 II Contract Closeout 2008-020 III Prohibition on Contracting with Inverted Domestic Corporations 2008-009 IV Buy American Exemption for Commercial Information Technology - Construction Material 2009-039 V Oversight of Contractor Ethics Programs 2010-017 VI Technical Amendments N/A Item I--Sustainable Acquisition (FAR Case 2010-001) (Interim) This interim rule amends the FAR to implement Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management. It requires Federal agencies to leverage agency acquisitions to foster markets for

297

M E Environmental Management Environmental Management  

Broader source: Energy.gov (indexed) [DOE]

safety  performance  cleanup  closure safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D Program 2013 Edition U.S. Department Of Energy safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management 3/13/2013 The American Recovery and Reinvestment Act of 2009

298

Environmental Protection Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Details Site Details EPD Home Staff List (pdf) Org Chart (pdf) Compliance / Permits Programs Other Information Land Use & Institutional Controls Mapping Site Environmental Reports Environmental Monitoring Plan (EMP) Spill Response BNL Site Index Can't View PDFs? Developing Environmental Products and Services for Brookhaven Stakeholders The Environmental Protection Division (EPD) develops and delivers environmental products and services for all Brookhaven stakeholders. We manage environmental programs such as pollution prevention, groundwater protection, and natural resource management; provide technical assistance on environmental requirements; maintain the Laboratory's IS0 14001-registered Environmental Management System; prepare environmental permit applications; conduct environmental monitoring; manage data

299

DATE: REPLY TO ATINOF SUBJECT: DEPA RT MEN T OF E NERGY  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATINOF SUBJECT: DEPA RT MEN T OF E NERGY Memorandum January 17, 2013 John McKenzie, NA-30 FY 2013 NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUMMARY ro Gregory H. Woods, General Counsel Attached please find the 2013 Annual National Environmental Policy Act (NEPA) Planning Summary for Naval Reactors ( NR). This is in accordance with the Department of Energy (DOE) Order 451.1 B, Section 4.d. The Naval Nuclear Propulsion Program is

300

Environmental Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Small Business Issues for Environmental Restoration Acquisitions  

Broader source: Energy.gov (indexed) [DOE]

Issues for Environmental Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement contract, the Federal Government retains a portion of the payments made to the contractor so that, at the end of the contract, when the final audit is completed and actions are taken to close

302

Essays on Environmental and Resource Economics  

E-Print Network [OSTI]

environmental offices, water, waste, environmental managementspaces, water treatment, environmental management, wastespaces, water treatment, environmental management, waste

Toledo, Chantal Nathalie

2013-01-01T23:59:59.000Z

303

EXECUTIVE OFFICE OF THE PRESIDENT COUNCIL ON ENVIRONMENTAL QUALITY  

Broader source: Energy.gov (indexed) [DOE]

1 May 12, 2010 MEMORANDUM FOR HEADS OF FEDERAL DEPARTMENTS AND AGENCIES FROM: Nancy H. Sutley Chair SUBJECT: Emergencies and the National Environmental Policy Act With this Memorandum, the Council on Environmental Quality (CEQ) reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions. [1] This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. Agencies should distribute this guidance to field offices developing and taking actions in response to emergencies along with the agency's relevant guidance on emergency actions and NEPA.

304

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

305

ENVIRONMENTAL PURCHASING POLICY  

E-Print Network [OSTI]

. The Purchasing Office will assist all staff to comply with this policy through the following: Raise environmentalENVIRONMENTAL PURCHASING POLICY The University of Leeds Environmental Policy includes the following environmental performance". In line with this the University's Environmental Purchasing Policy requires

Haase, Markus

306

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE  

E-Print Network [OSTI]

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE Subject: Training for the Safe Transportation of Biologics (DOT/IATA Dangerous Goods) Date: 07/03/2006 Revision: 04 Page: 1 of 9 SUMMARY.S. Department of Transportation (DOT) regulates shipping and receiving of biologics as Dangerous Goods

Shyy, Wei

307

ORISE: Human Subjects Protection Resource Protection Book  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Human Subjects Protection Resource Book Human Subjects Protection Resource Book The Human Subjects Protection Resource Book synthesizes information currently available on the protection of human subjects in research, the continuing application of such information to new areas of endeavor, and ever-changing rules, regulations, and guidance. This resource, to which the Oak Ridge Institute for Science and Education (ORISE) contributed, is for investigators, institutional review boards, research organizations, research subjects and others. The book contains chapters that provide background information on the history and development of federal regulations; chapters that discuss procedural and substantive issues regarding the review and conduct of human subjects research; and chapters that are specific to one type of research

308

Operator valued Hardy spaces and related subjects  

E-Print Network [OSTI]

OPERATOR VALUED HARDY SPACES AND RELATED SUBJECTS A Dissertation by TAO MEI Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY August 2006 Major... by: Chair of Committee, Gilles Pisier Committee Members, William Johnson Roger Smith Daren Cline Head of Department, Al Boggess August 2006 Major Subject: Mathematics iii ABSTRACT Operator Valued Hardy Spaces and Related Subjects. (August 2006) Tao...

Mei, Tao

2006-10-30T23:59:59.000Z

309

National Environmental Information Infrastructure  

E-Print Network [OSTI]

National Environmental Information Infrastructure: Reference Architecture Contributing Information Infrastructure: Reference Architecture v1.1 Environmental Information Programme Publication Series: Reference Architecture, Environmental Information Programme Publication Series, document no. 4, Bureau

Greenslade, Diana

310

Environmental Technology and Emergency  

E-Print Network [OSTI]

Conservation and Recovery Act (RCRA), the Clean Air Act, Water Quality, and Method 9 Visible Emissions in environmental applications and emergency management. Past projects include assistance in environmental rule, border environmental and security studies, emergency communications, and energy assurance reviews

McGraw, Kevin J.

311

Best Environmental Management Practices  

E-Print Network [OSTI]

Best Environmental Management Practices Farm Animal Production Disposal of Farm Medical Wastes Dan Vitamins and minerals Topical Medications Sprays Dewormers Ointments #12;Best Environmental Management of environmental contamination with chemicals or infectious agents. These include, among others: Injectable

312

Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

313

Environmental Resource Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Resource Management This division delivers science-based engineering solutions to meet regional and national energy, water and other critical environmental...

314

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

315

Department of Environmental  

E-Print Network [OSTI]

Department of Environmental Safety DIVISION OF ADMINISTRATIVE AFFAIRS RESPIRATORY PROTECTION. Department of Environmental Safety (DES) shall: 1. Assign the Manager, Occupational Safety & Health

Rubloff, Gary W.

316

Environmental Management Commission (Alabama)  

Broader source: Energy.gov [DOE]

The Alabama Department of Environmental Management is charged with developing the state's environmental policy, hearing administrative appeals of permits, administrative orders and variances issued...

317

Policy Title: Human Subject Responsible Office: UFS  

E-Print Network [OSTI]

Policy Title: Human Subject Payments Responsible Office: UFS HARVARD UNIVERSITY FINANCIAL POLICY Effective Date: 1/1/11 Revision Date: N/A HUMAN SUBJECT PAYMENTS Policy Number TAX102 HARVARD UNIVERSITY FINANCIAL POLICY POLICY STATEMENT Individuals conducting Harvard research studies that compensate human

Chen, Yiling

318

Biomedical Monitoring of Non-Hospitalized Subjects  

E-Print Network [OSTI]

Biomedical Monitoring of Non-Hospitalized Subjects using Disruption-Tolerant Wireless Sensors for the collection of biomedical data produced by sensors carried by mobile non-hospitalized subjects. In this paper we investigate the possibility of using these many hotspots as gateways for biomedical data

Paris-Sud XI, Université de

319

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

320

Career Map: Environmental Scientist  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Environmental Scientist positions.

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

ENVIRONMENTAL COMPLIANCE SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS  

E-Print Network [OSTI]

· Environmental Database Development and Management · Storm Water Modeling #12;ENVIRONMENTAL COMPLIANCE SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML of environmental managers. The Center provides assistance to environmental managers in compliance areas such as air

322

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

323

Subject: Cost and Price Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Subject: Cost and Price Analysis Subject: Cost and Price Analysis Subject: Cost and Price Analysis More Documents & Publications Acquisition Letter 2009-03 Acquisition...

324

Environmental Effects Abroad of Major Federal Actions | Department of  

Broader source: Energy.gov (indexed) [DOE]

Effects Abroad of Major Federal Actions Effects Abroad of Major Federal Actions Environmental Effects Abroad of Major Federal Actions On January 4, 1979, President Carter signed Executive Order 12114, entitled Environmental Effects of Major Federal Actions. The purpose of this Council on Environmental Quality memorandum is to initiate the consultation process required by this Executive Order. 44 Fed Reg 18633: Council on Environmental Quality: Environmental Effects Abroad of Major Federal Actions More Documents & Publications Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline EO 12114: Environmental Effects Abroad of Major Federal Actions Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 44 Fed Reg

325

INEL Geothermal Environmental Program. Final environmental report  

SciTech Connect (OSTI)

An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

Thurow, T.L.; Cahn, L.S.

1982-09-01T23:59:59.000Z

326

Martin, Mary From: Sent: To: Cc: Subject: Cohn, Linda  

Broader source: Energy.gov (indexed) [DOE]

Mary Mary From: Sent: To: Cc: Subject: Cohn, Linda Thursday, January 20,201 1 9:00 PM Martin, Mary Ginyard, Irma; Tauber, Alicia ANNUAL NEPA SUMMARY - NEVADA SITE OFFICE Attached is the Annual NEPA Summary for the Nevada Site Office. Please give me a call if you have any questions or need fkther information. Linda M. Cohn, NEPA Compliance Officer National Nuciear Security Administration Nevada Site Office P.O. Box 98518 Las Vegas, NV 89193-8518 702-295-0077 ! Annual NEPA Planning Summary - . - - - - . - - - - - -. - . - . - I Environmental Assessments Ongoing or Expected to be Prepared in the Next 12 Months . - - - -- - - - . -- - ~ .. National Nuclear Security - - Administrafion - Nevada Site Office - . - I -- I Estimated Schedule I Title, Location, Document Number , Estimated Cost

327

Statement Before the Subcommittee on Children's Health and Environmental  

Broader source: Energy.gov (indexed) [DOE]

Children's Health and Children's Health and Environmental Responsibility, Committee on Environment and Public Works, United States Senate (10/6/2011) Statement Before the Subcommittee on Children's Health and Environmental Responsibility, Committee on Environment and Public Works, United States Senate (10/6/2011) Statement Before the Subcommittee on Children's Health and Environmental Responsibility, Committee on Environment and Public Works, United States Senate By: David Geiser, Director, Office of Legacy Management, Department of Energy Subject: UMTRCA Statement before the Subcommittee on Children's Health and Environmental Responsibility, Committee on Environment and Public Works, United States Senate More Documents & Publications UMTRCA Sites Fact Sheet Guidance for Developing and Implementing Long-Term Surveillance Plans for

328

Environmentally and Economically Beneficial Practicee on Federal Landscaped Grounds  

Broader source: Energy.gov (indexed) [DOE]

W W A S H I N G T O N April 26, 1994 MEMORANDUM FOR THE HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES SUBJECT: Environmentally and Economically Beneficial Practicee on Federal Landscaped Grounds The Report of the National Performance Review contains recommendations for a series of environmental actions, including one to increase environmentally and economically beneficial landscaping practices at Federal facilities and federally funded project.. Environmentally beneficial landscaping entail. utilizing techniques that complement and enhance the local environment and seek to minimize the adverse effects that the landscaping will have on it. In particular, this means using regionally native plants and employing landscaping practices and technologies that conserve water

329

Characterization of subjective uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The 1996 performance assessment (PA) for the Waste Isolation Pilot Plant (WIPP) maintains a separation between stochastic (i.e., aleatory) and subjective (i.e., epistemic) uncertainty, with stochastic uncertainty arising from the possible disruptions that could occur at the WIPP over the 10,000 yr regulatory period specified by the US Environmental Protection Agency (40 CFR 191,40 CFR 194) and subjective uncertainty arising from an inability to uniquely characterize many of the inputs required in the 1996 WIPP PA. The characterization of subjective uncertainty is discussed, including assignment of distributions, uncertain variables selected for inclusion in analysis, correlation control, sample size, statistical confidence on mean complementary cumulative distribution functions, generation of Latin hypercube samples, sensitivity analysis techniques, and scenarios involving stochastic and subjective uncertainty.

HELTON,JON CRAIG; MARTELL,MARY-ALENA; TIERNEY,MARTIN S.

2000-05-18T23:59:59.000Z

330

Environmental Records.doc  

Broader source: Energy.gov (indexed) [DOE]

TERMS TERMS ALARA as low as reasonably achievable CAA Clean Air Act CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations CX categorical exclusion DOE U.S. Department of Energy EA environmental assessment ECL environmental checklist EIS environmental impact statement EPA U.S. Environmental Protection Agency EPCRA Emergency Planning and Community Right-To-Know Act of 1986 FFA&CO Federal Facility Agreement & Consent Order FRC Federal Records Center HEPA high-efficiency particulate air IB information bulletin MSDS material safety data sheet NAAQS National Ambient Air Quality Standards Program NARA National Archives and Records Administration

331

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

332

An environmental assessment system for environmental technologies  

Science Journals Connector (OSTI)

A new model for the environmental assessment of environmental technologies, EASETECH, has been developed. The primary aim of EASETECH is to perform life-cycle assessment (LCA) of complex systems handling heterogeneous material flows. The objectives of ... Keywords: EASETECH, Flow modelling, LCA model, Life cycle assessment, Uncertainty, Waste

Julie Clavreul, Hubert Baumeister, Thomas H. Christensen, Anders Damgaard

2014-10-01T23:59:59.000Z

333

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

334

Environmental Monitoring and Assessment of Environmental Estrogens in Marine  

E-Print Network [OSTI]

of Orange County,CA. Environmental Toxicology and ChemistryCalifornia Flatfish. Society of Environmental Toxicology andOcean. Society of Environmental Toxicology and Chemistry. (

Schlenk, D

2006-01-01T23:59:59.000Z

335

Environmental Knowledge, Environmental Attitudes, and Vehicle Ownership and Use  

E-Print Network [OSTI]

Trade-offs and Forest Environmentalism. Electronic Greena Coherent Theory of Environmentally Significant Behavior.and Determinants of Environmentally Significant Consumer

Flamm, Bradley John

2006-01-01T23:59:59.000Z

336

Environmental Survey preliminary report, Sandia National Laboratories, Livermore, California  

SciTech Connect (OSTI)

This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Sandia National Laboratories Livermore (SNLL), located at Livermore, California. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The SNLL Survey is a portion of the larger, comprehensive DOE Environmental Survey encompassing all major operating facilities of DOE. The DOE Environmental Survey is one of a series of initiatives announced on September 18, 1985, by Secretary of Energy, John S. Herrington, to strengthen the environmental, safety, and health programs and activities within DOE. The purpose of the Environmental Survey is to identify, via a no fault'' baseline Survey of all the Department's major operating facilities, environmental problems and areas of environmental risk. The identified problem areas will be prioritized on a Department-wide basis in order of importance in 1989. The findings in this report are subject to modification based on the results from the Sampling and Analysis Phase of the Survey. The findings are also subject to modification based on comments from the Albuquerque Operations Office concerning the technical accuracy of the findings. The modified preliminary findings and any other appropriate changes will be incorporated into an Interim Report. The Interim Report will serve as the site-specific source for environmental information generated by the Survey, and ultimately as the primary source of information for the DOE-wide prioritization of environmental problems in the Survey Summary Report. 43 refs., 21 figs., 24 tabs.

Not Available

1988-01-01T23:59:59.000Z

337

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

338

Waste Isolation Pilot Plant CY 2000 Site Environmental Report  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse effects from WIPP on the surrounding environment.

Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

2001-12-31T23:59:59.000Z

339

ENVIRONMENTAL, HEALTH AND SAFETY  

E-Print Network [OSTI]

Professonal Education Showcase New! Professional Concentration in Environmental Management for Industry HEALTH AND SAFETY PROGRAMS #12;NEW Professional Concentration in Environmental Management for Industry management, air quality, water quality and hazardous materials transportation. Acquire the knowledge to help

California at Davis, University of

340

environmental, health and safety  

E-Print Network [OSTI]

Professonal Education Showcase New! Professional Concentration in Environmental Management for Industry for hazardous materials, waste stream management, air quality, water quality and hazardous materials The Professional Concentration in Environmental Management for Industry and Facilities is designed specifically

California at Davis, University of

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Environmental Management System Plan  

E-Print Network [OSTI]

management Water conservation LBNLs approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

342

Environmental Impact Statements  

Broader source: Energy.gov [DOE]

The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPOs due diligence process for issuing a...

343

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

344

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

345

Safety & Environmental Protection Services  

E-Print Network [OSTI]

Safety & Environmental Protection Services Guidance Note --------------------------------------------------------------------------------------------------------------------------------------------- UNIVERSITY OF GLASGOW Safety & Environmental Protection Services 1 Telephone: 0141-330-5532 Email: safety of others who live near you. It is about fire and the tragic consequences of getting some simple things

Guo, Zaoyang

346

Safety & Environmental Protection Services  

E-Print Network [OSTI]

Safety & Environmental Protection Services Guidance Note --------------------------------------------------------------------------------------------------------------------------------------------- UNIVERSITY OF GLASGOW Safety & Environmental Protection Services 1 Telephone: 0141-330-5532 Email: safety FOR THE CURRENT REVISION. Emergency Fire Action Plan Revision 03/10 Listed below are the procedures and other

Guo, Zaoyang

347

Environmentally Brookhaven Science Associates  

E-Print Network [OSTI]

Products Purchasing preference required for all Federal agencies: · Office: binders, containers, foldersEnvironmentally Preferable Purchasing A. Bou #12;Brookhaven Science Associates Environmentally Preferable Purchasing Definition: Acquisition of products or services that have a lesser or reduced effect

348

Global Environmental Course Title  

E-Print Network [OSTI]

Department Global Environmental Studies Room Course Title Frontier of Sustainability Science Instructor Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced consisting from a variety of academic field, including philosophy, politics, economics, energy, architecture

Takada, Shoji

349

Environmental Frontier of Sustainability  

E-Print Network [OSTI]

A A Global Environmental Studies Frontier of Sustainability Science Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced Energy, etc Integrated Research Bld, economics, energy, architecture, meteorology and biology and so on. In this sense, this class welcomes

Takada, Shoji

350

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

& Development & Development Advanced Alloy Fabrication Jeffrey A. Hawk & Paul D. Jablonski Materials Research Engineer & Metallurgist, NETL Wednesday, November 25, 2012 ‹#› Technology or Capability Overview * Computer Modeling for Alloy Design & Life Prediction * Melting, Casting, Fabrication & Heat Treatment * Environmental Characterization * Mechanical Testing & Evaluation * Microstructure Characterization & Analysis ‹#› Technology or Capability Overview * Computer Modeling for Alloy Design & Life Prediction * Melting, Casting, Fabrication & Heat Treatment * Environmental Characterization * Mechanical Testing & Evaluation * Microstructure Characterization & Analysis ‹#› Melting and Fabrication Facilities

351

Microsoft Word - SA-002-EIS-3473-Riparian Conservation Easement Program SA.doc  

Broader source: Energy.gov (indexed) [DOE]

16, 2005 16, 2005 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-002) Chris Furey - KEWR-4 Proposed Action: Columbia Basin Riparian Conservation Easement Program Location: The action area for the pilot initiative includes the Columbia Cascade Province, specifically the Entiat, Methow, Okanogan and Wenatchee subbasins. Geographic scope of the project may be expanded to other areas within the Columbia River basin in the future following the pilot initiative. Proposed by: Bonneville Power Administration (BPA) and the National Fish and Wildlife Foundation (NFWF). Description of the Proposed Action: The goal of the Columbia Basin Riparian Conservation Easement

352

Environmental Impacts of Repository  

Broader source: Energy.gov (indexed) [DOE]

~~"'"""""""""'l.. _ _ 4 Environmental Impacts of Repository Construction, Operation and Monitoring, and Closure 4-iii Environmental Impacts of Repository Construction, Operations, Monitoring, and Closure TABLE OF CONTENTS Section Page 4. Environmental Impacts of Repository Construction, Operations, Monitoring, and Closure ..............4-1 4.1 Preclosure Environmental Impacts of Construction, Operations, Monitoring, and Closure of a Repository ...............................................................................................................................4-3 4.1.1 Impacts to Land Use and Ownership .......................................................................................4-4

353

Essays on Environmental Regulatory Policy  

E-Print Network [OSTI]

I. W. (2008). Instrument Choice in Environmental Policy.Review of Environmental Economics and Policy, 2 (2), 152-other Approaches to Environmental Protection: The Critical

Dobson, Sarah

2012-01-01T23:59:59.000Z

354

SUBJECT: MEMORANDUM DAu&!Lg)_)~Q-----__  

Office of Legacy Management (LM)

SUBJECT: SUBJECT: MEMORANDUM DAu&!Lg)_)~Q-----__ :::I: R~&a~.a cp"pwy ALTERNATE . -- --- ------------------ NAME : ---------------------- CITY: e.&mrd --B---s-------- STATE: -&+- -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- 0 Research b Devrlopment q Facility Type 0 Production scale testing 8 Pilot Scale Bench Seal e Process 0 Theoretical Studies 0 Sample & Analysis @ Manuf l cturing 0 University IJ Research Organization 0 Government Sponsored Facility 0 Other --------------------- 0 Production Cl Disposal /Storage TY?Z OF CONTRACT ---------------- 0 Prime 0 Subcontract& 7 Purchase Order 0 Other information (i.e., cost + fixed fee, unit price, time & material, ate) ----e-w

355

Rutgers University Environmental Assessment  

E-Print Network [OSTI]

, chemical use, water use, and sustainable materials management into MTCO2e. The EPA WARM Model which helpsRutgers University Environmental Assessment: MOU SemiAnnual Report May 31, 2013 Environmental) pledging to become an environmental steward by implementing a number of green initiatives that would reduce

Hanson, Stephen José

356

Rutgers University Environmental Assessment  

E-Print Network [OSTI]

for electricity, green energy, fuel use, chemical use, water use, and sustainable materials management into MTCO2eRutgers University Environmental Assessment: MOU SemiAnnual Report November 4, 2011 Environmental) pledging to become an environmental steward by implementing a number of green initiatives that would reduce

Delgado, Mauricio

357

Environmental analysis & Re-  

E-Print Network [OSTI]

Environmental analysis & Re- sources Manage- ment includes a range of careers. Environmental, and managers of land, water, and atmos- pheric resources. Their job titles include those listed in the bulleted to make you an attractive and competitive environmental management professional. The package is based

de Doncker, Elise

358

LCA and Environmental Intelligence?  

Science Journals Connector (OSTI)

LCA and Environmental Intelligence? ... Graedel and Allenby define LCA as an objective process to evaluate the environmental burdens associated with a product, process or activity?... and to evaluate and implement opportunities to effect environmental improvements (Industrial Ecology, 2nd ed., Prentice Hall: New York, 2003 [my emphasis]). ... But is LCA really objective? ...

Jerald L. Schnoor

2009-04-10T23:59:59.000Z

359

Environmental Health & Safety  

E-Print Network [OSTI]

Environmental Health & Safety Sub Department Name 480 Oak Rd, Stanford, CA 94305 T 650.723.0448 F 650.725.3468 DEPUTY DIRECTOR, ENVIRONMENTAL HEALTH AND SAFETY Exempt, Full-Time (100% FTE) Posted May 1, 2014 The Department of Environmental Health and Safety (EH&S) at Stanford University seeks

360

Department of Civil & Environmental  

E-Print Network [OSTI]

, environmental planning and policy, education, landscape architecture and applied mechanics. #12;Our ResearchDeveloping Leaders of Innovation Department of Civil & Environmental Engineering #12;At the U.Va. Department of Civil and Environmental Engineering, our faculty and students serve society's need

Acton, Scott

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network [OSTI]

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

362

Environmental Best Management Practices  

E-Print Network [OSTI]

Environmental Best Management Practices for Virginia's Golf Courses Prepared by Virginia Golf Course Superintendents Association #12;#12;EnvironmEntal BEst managEmEnt PracticEs for virginia's golf III I am pleased to endorse the Environmental Best Management Practices for Virginia's Golf Courses

Liskiewicz, Maciej

363

2014 Secretary of Defense Environmental Awards For more information about the DoD Environmental Program, please visit www.denix.osd.mil  

E-Print Network [OSTI]

six subject areas: natural resources conservation; environmental quality; sustainability archaeological sites and 42 historic buildings and structures, the CRM program supports Fort Wainwright and organizations including 42 federally-recognized tribes, the CRM program continues to build relationships

364

ENVIRONMENTAL POLICY STATEMENT NATIONAL INSTITUTE OF ENVIRONMENTAL HEALTH SCIENCES  

E-Print Network [OSTI]

ENVIRONMENTAL POLICY STATEMENT FOR THE NATIONAL INSTITUTE OF ENVIRONMENTAL HEALTH SCIENCES that minimize environmental impact. C. Healthy Built Environment. The NIEHS will seek to integrate. This will be proactively demonstrated by our commitment to continually improve the Institute's environmental stewardship

Bandettini, Peter A.

365

Reference: RGL 82-02 Subject: WETLANDS  

E-Print Network [OSTI]

Reference: RGL 82-02 Subject: WETLANDS Title: CLARIFICATION OF "NORMAL CIRCUMSTANCES" IN THE WETLAND DEFINITION Issued: 02/11/82 Expires: 12/31/84 Originator: DAEN-CWO-N Description: DEFINES NORMAL CIRCUMSTANCES, CONVERTED WETLANDS, AND ABNORMAL PRESENCE OF AQUATIC VEGETATION 1. This letter will serve

US Army Corps of Engineers

366

1994 Site Environmental Report  

SciTech Connect (OSTI)

The 1994 Site Environmental Report summarizes environmental activities at Lawrence Berkeley Laboratory (LBL) for the calendar year (CY) 1994. The report strives to present environmental data in a manner that characterizes the performance and compliance status of the Laboratory`s environmental management programs when measured against regulatory standards and DOE requirements. The report also discusses significant highlight and planning efforts of these programs. The format and content of the report are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, General Environmental Protection Program.

NONE

1995-05-01T23:59:59.000Z

367

Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"  

Broader source: Energy.gov [DOE]

ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

368

Jebeile. The Mobile Subject Assistant THE MOBILE SUBJECT ASSISTANT: A MOBILE COURSE TOOL  

E-Print Network [OSTI]

Jebeile. The Mobile Subject Assistant THE MOBILE SUBJECT ASSISTANT: A MOBILE COURSE TOOL of Wollongong ABSTRACT: The rapid adoption rate of mobile phones coupled with advancements in supporting technologies suggests mobile phones may now be a viable tool for classroom use. In this paper we introduce

Rubinstein, Benjamin

369

Environmental Compliance Audit & Assessment Program Manual  

E-Print Network [OSTI]

include: Storm Water Management Environmental Services DavidEnvironmental Management System Environmental Radiation Protection Environmental Restoration Hazardous Waste Fixed Treatment Units Storm WaterEnvironmental Management System Environmental Radiation Protection Environmental Restoration Hazardous Waste Fixed Treatment Units Storm Water

Thorson, Patrick

2009-01-01T23:59:59.000Z

370

Environmental Compliance Management System  

SciTech Connect (OSTI)

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

371

Browse by Discipline -- E-print Network Subject Pathways: Mathematics...  

Office of Scientific and Technical Information (OSTI)

- Department of Civil and Environmental Engineering, University of California, Irvine Johnson, Robert A. (Robert A. Johnson) - Department of Environmental Science and Policy,...

372

UGP Environmental Review (NEPA)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Review-NEPA Environmental Review-NEPA Categorical exclusions are posted here to promote transparency and openness. Some actions may have environmental impacts that require an environmental assessment and a detailed analysis to determine the extent and severity of the impacts. For actions that have significant impacts or consequences to the environment or human health, UGP prepares environmental impact statements. Environmental Impact Statement-EIS Groton Generation Projects Draft EIS, Deer Creek Station Energy Facility Project, Brookings County, South Dakota (12.7mb pdf) Deer Creek Station Energy Facility Project Record of Decision (900kb pdf) Grande Praire Wind Farm, O'Neill, NE Wilton IV Wind Energy Center EIS (DOE/EIS-0469) Upper Great Plains Wind Energy Programmatic EIS (DOE/EIS-0408)

373

Earth & Environmental Science  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Earth & Environmental Science Earth & Environmental Science Earth & Environmental Science1354608000000Earth & Environmental ScienceSome of these resources are LANL-only and will require Remote Access./No/Questions? 667-5809library@lanl.gov Earth & Environmental Science Some of these resources are LANL-only and will require Remote Access. Key Resources Reference Data Sources Organizations Journals Key Resources AGRICOLA The catalog and index to the collections of the National Agricultural Library, as well as a primary public source for world-wide access to agricultural information. BioOne A global, not-for-profit collaboration bringing together scientific societies, publishers, and libraries to provide access to critical, peer-reviewed research in the biological, ecological, and environmental

374

RM Environmental Review (NEPA)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Review-NEPA Environmental Review-NEPA Categorical exclusions are posted here to promote transparency and openness. Some actions may have environmental impacts that require an environmental assessment and a detailed analysis to determine the extent and severity of the impacts. For actions that have significant impacts or consequences to the environment or human health, RM prepares environmental impact statements. Environmental Impact Statements-EIS Estes-Flatiron Transmission Line Rebuild Project Granby Pumping Plant-Windy Gap Transmission Line Rebuild Project Hermosa West Wind Energy Project Maintenance and Vegetation Management along Existing Western TransmissionLine Rights of Way on National Forest System Lands in Colorado, Utah, Nebraska Platte River Cooperative Agreement PEIS, NE, CO and WY, DOE/EIS-0295 (Cooperating Agency)

375

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

e'-ä\r., e'-ä\r., a"àT#j UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 6 14,15 ROSS AVENUE, SUITE 1200 DALLAS, TX 752A2-n33 JA¡t 5 20ll cERTrrmD rytAlr- RETIIRN RECETPT REOITESIEn COPY Edward Ziemianski Acting Manager U.S. Department of Energy Carlsbad Field Offïce P.O. Box 3090 Carlsbad, NM 88221 RE: United States Environmental Protection Agency (EPA) Region 6 Response to the Waste Isolation Pilot Plant OVPP) Approval Request to Use Panel 8 to Store and Land Dispose Polychlorinated Biphenyls (PCBs) at the WIPP Fasility located in Carlsbadr New Mexico DearMr. Ziemianski: After review ofthe design and proposed operation ofPanel 8, you are hereby approved to dispose of PCB wastes in Þanel 8 subject to the enclosed Conditions of Afproval. Your letter (dated October 25,2010) qéquested apprgrral to-qse

376

PIEDMONT ENVIRONMENTAL COUNCIL  

Broader source: Energy.gov (indexed) [DOE]

PIEDMONT ENVIRONMENTAL COUNCIL PIEDMONT ENVIRONMENTAL COUNCIL October 30, 2013 Julie A. Smith and Christopher Lawrence Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 VIA electronic mail: juliea.smith@hq.doe.gov christopher.lawrence@hq.doe.gov Dear Ms. Smith and Mr. Lawrence: The Piedmont Environmental Council (PEC) was founded in 1972 to promote and protect the Virginia

377

Rage against the machines: how subjects play against learning algorithms  

E-Print Network [OSTI]

B. : Rage against the machinesHow Subjects Learn to PlayARTICLE Rage against the machines: how subjects play againsterror. Rage against the machines representative of real

Duersch, Peter; Kolb, Albert; Oechssler, Jrg; Schipper, Burkhard C.

2010-01-01T23:59:59.000Z

378

Environmental report 1993  

SciTech Connect (OSTI)

Lawrence Livermore National Laboratory (LLNL), a US Department of Energy (DOE) facility operated by the University of California, serves as a national resource of scientific, technical, and engineering capability with a special focus on national security. Over the years, the Laboratory`s mission has been broadened to encompass such areas as strategic defense, energy, the environment, biomedicine, the economy, and education. The Laboratory carries out this mission in compliance with local, state, and federal environmental regulatory requirements and takes measures to ensure that its operations do not adversely affect the environment or public health. It does so with the support of the Environmental Protection Department, which is responsible for environmental monitoring, environmental restoration, hazardous waste management, and ensuring environmental compliance. During 1993, the Environmental Protection Department conducted sampling of air, sewage effluent, ground water, surface water, soil, vegetation and foodstuffs, and took measurements of environmental radiation. It performed more than 190,000 analyses of environmental samples. The analytical results are summarized along with evaluations of the impact of radioactive and nonradioactive materials, a discussion of the effects of LLNL operations on the environment, and a summary of the activities undertaken to comply with local, state, and federal environmental laws.

Wilt, G.C. [ed.; Gallegos, G.M.; Tate, P.J.; Balke, B.K. [and others

1994-09-01T23:59:59.000Z

379

Environmental Cleanup Stories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of March 2013. - 11112 Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Los Alamos National Laboratory names Jeffrey Mousseau Associate...

380

Annual Environmental Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the results of environmental monitoring of air, surface water, groundwater, sediments, soils, plants, and animals performed at LANL during a calendar year. Contact...

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental Quality: Air (Louisiana)  

Broader source: Energy.gov [DOE]

The Department of Environmental Quality regulates air quality in Louisiana. The Department has an established a fee system for funding the monitoring, investigation and other activities required...

382

Environmental monitoring plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

383

INL's Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and minimize environmental impacts throughout the lifecycle of INL facilities and operations. Conduct all activities and manage hazardous and radioactive materials and...

384

Environmental Business Channels  

Science Journals Connector (OSTI)

With the impact of fracking operations still under study, the jury is ... which the process may be harmful to the environment. Some specific concerns being raised by environmental...

Nahed Taher; Bandar Hajjar

2014-01-01T23:59:59.000Z

385

1999 Site Environmental Report  

SciTech Connect (OSTI)

The Site Environmental Report for Brookhaven National Laboratory for the calendar year 1999, as required by DOE Order 231.1.

NONE

2000-09-01T23:59:59.000Z

386

EWONAP Environmental Review  

Office of Energy Efficiency and Renewable Energy (EERE)

HUD's Eastern Woodlands Office of Native American Programs in collaboration with the Seminole Tribe of Florida Native Learning Center invites you to attend the Environmental Review Training...

387

Supplement 21, Part 6, Parasite-Subject Catalogue: Subject Headings and Treatment  

E-Print Network [OSTI]

., 1973 b Entamoeba histolytica, effects of estrogen on hepatic amoebic abscess, hamsters j possibly responsible for lower frequency of abscess in women Abscess Tsai, S.H., 1973 a human hepatic amoebiasis, review of treatments used over 18 years...index Section UNITED STATES DEPARTMENT OP AGRICULTURE CATALOGUE OP MEDICAL AND VETERINARY ZOOLOGY SUPPLEMENT 21, PART 6 PARASITE-SUBJECT CATALOGUE : SUBJECT HEADINGS AND TREATMENT RECEIVED ! IPP?PV MAY 02 1963 IME UNIVERSITY 0? TEXAS HEAI...

Hood, Martha W.; Rayburn, Jane D.

1976-01-01T23:59:59.000Z

388

Supplement 19, Part 6, Parasite-Subject Catalogue: Subject Headings And Treatment  

E-Print Network [OSTI]

UNITED STATES DEPARTMENT OF AGRICULTURE i INDEX-CATALOGUE OF MEDICAL AND VETERINARY ZOOLOGY SUPPLEMENT 19, PART 6 PARASITE-SUBJECT CATALOGUE: SUBJECT HEADINGS AND TREATMENT By MARTHA L. WALKER, Zoologist JANE D. RAYBURN, Technical Information... Specialist JUDITH HUMPHREY SHAW, Zoologist MARGIE D. KIRBY, Technical Information Specialist SHIRLEY J. EDWARDS, Technical Information Specialist ANIMAL PARASITOLOGY INSTITUTE AGRICULTURAL RESEARCH SERVICE Issued March 1974 U.S. GOVERNMENT PRINTING...

Walker, Martha L.; Rayburn, Jane D.; Shaw, Judith H.; Kirby, Margie D.; Edwards, Shirley J.

1974-01-01T23:59:59.000Z

389

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne_NETL Argonne_NETL Meeting_July28/2008 Advanced Research Program Overview Robert R. Romanosky Advanced Research Technology Manager 2 Advanced Research Program Extend state of knowledge in fossil energy technology by supporting development and deployment of innovative systems capable of improving efficiency and environmental performance while reducing costs Reflective of industry needs and responsible for driving new technologies Bridge the gap between fundamental and applied technologies Develop technologies that address critical needs for Fossil Energy 3 Stages of Energy RD&D Basic Research Applied Research Bridges basic research & technology development programs Process & Engineering Development Demonstration & Commercialization Research Phases I n d

390

EA-1545: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment Final Environmental Assessment EA-1545: Final Environmental Assessment Proposed Withdrawal of Public Lands Within and Surrounding the Calliente Rail Corridor, Nevada The proposed action addressed in this EA is the withdrawal of approximately 308,600 acres of public land administered by the the Bureau of Land Management from surface entry and new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor, as described in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada (DOE 2002). Environmental Assessment for the Proposed Withdrawal of Public Lands Within and Surrounding the Calliente Rail Corrider, Nevada, DOE/EA-1545 (December

391

October 15, 2008 Environmental  

E-Print Network [OSTI]

and Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Final Rule VerDate Aug2005 18 Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada AGENCY of in the potential repository at Yucca Mountain, Nevada. Congress directed us to develop these standards and required

392

Hacettepe University Environmental Engineering  

E-Print Network [OSTI]

,Turkey. Research Interests - Indoor and outdoor air pollution, statistical data analysis, environmental management.Sc., and Ph.D.) Industrial Engineering (B.Sc) Environmental Engineering (M.Sc. and Ph.D.) Mining Engineering. Research Interests - Water pollution control, physical-chemical processes for water and wastewater

Köprülü, Kahraman Güçlü

393

SAFETY MANUAL ENVIRONMENTAL  

E-Print Network [OSTI]

HAZARDOUS MATERIALS SAFETY MANUAL ENVIRONMENTAL HEALTH & SAFETY #12;Emergency Phone Numbers Newark-800-722-7112 National .....................................1-800-222-1222 July 2007 Environmental Health and Safety://www.udel.edu/ehs #12;University Of Delaware Safety Policy Number 7-1 The policy of the University of Delaware

Firestone, Jeremy

394

ENVIRONMENTAL HEALTH & SAFETY  

E-Print Network [OSTI]

ENVIRONMENTAL HEALTH & SAFETY ORIENTATION HANDBOOK Environmental Health and Safety Office safety & Safety Office 494-2495 (Phone) 494-2996 (Fax) Safety.Office@dal.ca (E-mail) www.dal.ca/safety (Web) Radiation Safety Office 494-1938 (Phone) 494-2996 (Fax) Melissa.Michaud@dal.ca (E-mail) University

Brownstone, Rob

395

Sensors for Environmental Observatories  

E-Print Network [OSTI]

Sensors for Environmental Observatories Report of the NSF-Sponsored Workshop December 2004 #12 States of America. 2005. #12;Sensors for Environmental Observatories Report of the NSF Sponsored Workshop sensor technology and the networks that collect data from them. Present work clearly demonstrates

Hamilton, Michael P.

396

ENERGY AND ENVIRONMENTAL ENGINEERING  

E-Print Network [OSTI]

for Environmental Engineering Research and Education has the overall responsibility for the coordination in the common-core engineering program. The Energy and Environment Specialization provides education different areas: · Environmental Engineering · Energy and Environment A course of study and research

Calgary, University of

397

Environmental Services Standard Tasks  

E-Print Network [OSTI]

1 Environmental Services Operations Standard Tasks The primary function of Environmental Services developed and implemented standard custodial tasks that meet industry standards. The standards are as follows: Exterior Building Cleaning Daily Clean ash urns Clean entry area glass Clean steps and remove

398

Environmental Engineering GRADUATE STUDIES  

E-Print Network [OSTI]

Formation and Control · Air Pollution Meteorology · Air Pollution Physics and Chemistry · Atmospheric quality monitoring, pollution control and model- ing; environmental sciences; and industrial ecology assessment. COURSES · Advanced Environmental Chemistry · Advanced Topics in Air Pollution · Air Pollution

Wang, Yuhang

399

Environmental Report 2007  

SciTech Connect (OSTI)

The purposes of the 'Lawrence Livermore National Laboratory Environmental Report 2007' are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites--the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2007: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary.

Mathews, S; Gallegos, G; Berg, L L; Bertoldo, N A; Campbell, C G; Cerruti, S; Doman, J L; Ferry, L S; Grayson, A R; Jones, H E; Kumamoto, G; Larson, J; MacQueen, D H; Paterson, L; Revelli, M A; Ridley, M; Rueppel, D; Wegrecki, A M; Wilson, K; Woollett, J

2008-09-24T23:59:59.000Z

400

Notices ENVIRONMENTAL PROTECTION AGENCY  

Broader source: Energy.gov (indexed) [DOE]

94 Federal Register 94 Federal Register / Vol. 74, No. 209 / Friday, October 30, 2009 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8798-8] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202-564-7146 or http://www.epa.gov/ compliance/nepa/. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated July 17, 2009 (74 FR 34754). Draft EISs EIS No. 20090290, ERP No. D-FTA- F54014-WI, Kenosha-Racine-Milwaukee

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DRAFT ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

402

Environmental Compliance Guide  

SciTech Connect (OSTI)

The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects.

None

1981-02-01T23:59:59.000Z

403

Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

404

Brookhaven National Laboratory site environmental report for calendar year 1995  

SciTech Connect (OSTI)

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1995. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment. Areas of known contamination are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement established by the Department of Energy, Environmental Protection Agency and the New York Department of Environmental Conservation. Except for identified areas of soil and groundwater contamination, the environmental monitoring data has continued to demonstrate that compliance was achieved with the applicable environmental laws and regulations governing emission and discharge of materials to the environment. Also, the data show that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public nor to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Paquette, D.E.; Schroeder, G.L. [eds.] [and others

1996-12-01T23:59:59.000Z

405

International Energy: Subject Thesaurus. Revision 1  

SciTech Connect (OSTI)

The International Energy Agency: Subject Thesaurus contains the standard vocabulary of indexing terms (descriptors) developed and structured to build and maintain energy information databases. Involved in this cooperative task are (1) the technical staff of the USDOE Office of Scientific and Technical Information (OSTI) in cooperation with the member countries of the International Energy Agency`s Energy Technology Data Exchange (ETDE) and (2) the International Atomic Energy Agency`s International Nuclear Information System (INIS) staff representing the more than 100 countries and organizations that record and index information for the international nuclear information community. ETDE member countries are also members of INIS. Nuclear information prepared for INIS by ETDE member countries is included in the ETDE Energy Database, which contains the online equivalent of the printed INIS Atomindex. Indexing terminology is therefore cooperatively standardized for use in both information systems. This structured vocabulary reflects thscope of international energy research, development, and technological programs. The terminology of this thesaurus aids in subject searching on commercial systems, such as ``Energy Science & Technology`` by DIALOG Information Services, ``Energy`` by STN International and the ``ETDE Energy Database`` by SilverPlatter. It is also the thesaurus for the Integrated Technical Information System (ITIS) online databases of the US Department of Energy.

Not Available

1993-11-01T23:59:59.000Z

406

Environmental Justice | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Justice Environmental Justice Environmental Justice Selected documents on the topic of Environmental Justice under NEPA. May 1, 2008 Environmental Justice Strategy In response to Executive Order 12898, DOE prepared and issued its Environmental Justice Strategy in 1995. Since then, the agency has conducted a series of activities to implement the Strategy. Both the Executive Order and the Strategy require that DOE establish and maintain an integrated approach for identifying, tracking, and monitoring environmental justice across the Department. July 1, 1999 Final Guidance for Consideration of Environmental Justice in Clean Air Act 309 Reviews This Environmental Protection Agency document provides guidance on reviewing and commenting on other federal agencies NEPA documents to help

407

Audit of Environmental Restoration at the Los Alamos National Laboratory. IG-0410  

Broader source: Energy.gov (indexed) [DOE]

John C. Layton John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of Environmental Restoration at the Los Alamos National Laboratory" BACKGROUND: The Los Alamos National Laboratory (Los Alamos) Environmental Restoration Program was primarily monitored by the U.S. Environmental Protection Agency (EPA) and the New Mexico Environment Department (NMED). However, in 1995, the Department of Energy (DOE) and Los Alamos adopted a performance-based management approach to contracting to hold Los Alamos more accountable for its Environmental Restoration Program. At Los Alamos, the Environmental Restoration Program's mission is to remediate sites contaminated with various forms of hazardous,

408

QUALITY ASSURANCE PROGRAM 1997 BNL Site Environmental Report 10 -1  

E-Print Network [OSTI]

, and improve implementation of the Division- wide QA program. 10.1 Environmental Surveillance Program The QA- prehensive QA program and are subject to audits by ES&HS Division personnel to ensure its implementation Management (QM) Office, headed by the QM Manager, coordinates and evaluates QA implementation

409

Energy and Environmental Systems Division's publications publications 1968-1982  

SciTech Connect (OSTI)

Books, journal articles, conference papers, and technical reports produced by the Energy and Environmental Systems Division of Argonne National Laboratory are listed in this bibliography. Subjects covered are energy resources (recovery and use); energy-efficient technology; electric utilities, and environments. (MCW)

none,

1982-03-01T23:59:59.000Z

410

Environmental and genetic strategies to improve carotenoids and quality in watermelon  

E-Print Network [OSTI]

ENVIRONMENTAL AND GENETIC STRATEGIES TO IMPROVE CAROTENOIDS AND QUALITY IN WATERMELON A Dissertation by HAE JEEN BANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment... of the requirements for the degree of DOCTOR OF PHILOSOPHY December 2005 Major Subject: Horticulture ENVIRONMENTAL AND GENETIC STRATEGIES TO IMPROVE CAROTENOIDS AND QUALITY IN WATERMELON A Dissertation...

Bang, Hae Jeen

2007-04-25T23:59:59.000Z

411

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

412

NETL: Global Environmental Benefits  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Global Environmental Benefits Global Environmental Benefits Gasification Systems Global Environmental Benefits Environmental performance for future energy production systems is a much greater factor as emission standards tighten in the United States and worldwide. The outstanding environmental performance of gasification systems makes it an excellent technology for the clean production of electricity and other products. In addition, the reduction of CO2 emissions is one of the major challenges facing industry in response to global climate change. Other countries with coal reserves might potentially import technologies developed in the United States to enable low-cost gasification with carbon capture and EOR or sequestration. Not only will this benefit the U.S. gasification technology industry, but it will also result in a global environmental benefit through more affordable control of greenhouse gases (GHGs). See the U.S. Environmental Protection Agency (EPA) link below for a summary of the impact of fossil fuels without carbon capture on CO2 emissions, on the GHG contributions of different countries, and of the projected impact of developing countries to 2030:

413

DATE: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH  

Broader source: Energy.gov (indexed) [DOE]

TO: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH 2005..19 March 1, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management STARS Conversion In April 2005, the Department will be converting to the new Standard Accounting and Reporting System (STARS). Department contractors and vendors will be encouraged to submit invoices early for goods or services to be delivered in March 2005 so they can be processed and paid by the end of the month. For such payment, invoices must be received by the Oak Ridge Financial Service Center not later than March 17,2005, and approving officials must provide their approvals by March 24,2005. Page 1 of2 To ensure a smooth transition, a one-time, limited delegation of Contracting Officer authority has been granted to the Director at Oak Ridge Financial Service Center for the purpose of signing

414

MEMORANDUMFORTHESECRETARY FROM: SUBJECT: Greg ry H. Friedman  

Broader source: Energy.gov (indexed) [DOE]

3, 2002 3, 2002 MEMORANDUMFORTHESECRETARY FROM: SUBJECT: Greg ry H. Friedman Inspector General INFORMATION: Report on the Department of Energy's Consolidated Financial Statements I am pleased to inform you that the Department of Energy's consolidated financial statements have received an unqualified audit opinion for the third consecutive year. This year, the Office of Inspector General contracted with the accounting firm ofKPMG LLP to conduct the audit. The accounting firm concluded that the consolidated financial statements present fairly, in all material respects, the Department's financial position as of September 30, 2001, and its net costs, changes in net position, budgetary resources, reconciliation of net costs to budgetary obligations, and custodial activities for the year then ended. We agree with the

415

Significant Environmental Aspects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Aspects Significant Environmental Aspects More Documents & Publications LM Significant Environmental Aspects CX-009630: Categorical Exclusion Determination...

416

Essays on Environmental and Resource Economics  

E-Print Network [OSTI]

spaces, water treatment, environmental management, wastespaces, water treatment, environmental management, wasteWater Standards. Journal of Environmental Economics and Management,

Toledo, Chantal Nathalie

2013-01-01T23:59:59.000Z

417

Site Environmental Report for 2008, Volume 1  

E-Print Network [OSTI]

Acquisition and use of environmentally preferable productssystem. HRC is an environmentally safe polylactate estercontent to purchase environmentally preferable products.

Lackner, Regina

2009-01-01T23:59:59.000Z

418

Everyday Environmentalism: Law, Nature & Individual Behavior  

E-Print Network [OSTI]

Review: Everyday Environmentalism: Law, Nature & IndividualJason J . Everyday Environmentalism: Law, Nature &this book to "promote environmentally conscious decision-

Anderson, Byron P.

2012-01-01T23:59:59.000Z

419

Site Environmental Report for 2007 Volume I  

E-Print Network [OSTI]

Fleet petroleum use Environmentally preferable purchasingFleet Petroleum Use Environmentally Preferable Purchasingsystem. HRC is an environmentally safe polylactate ester

Lackner, Regina E.

2008-01-01T23:59:59.000Z

420

Environmental Poisons in Our Food  

E-Print Network [OSTI]

that Environmental Poisons in Our Food comparison looks likeEnvironmental Poisons in Our Food. Chicago: PNB Publishers,what is Environmental Poisons in Our Food? It is more than a

Kaag, Cindy

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

31-10 31-10 u.s. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Restoration of drill pads, infiltration basins, sumps, and other surface areas at the Central Nevada Test Area, Nevada A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes to restore two drill pads with infiltration basins, two lined sumps, and miscellaneous surface areas associated with groundwater monitoring wells. A small crew of four people would take 2 weeks to complete this work in early September 2010. Disturbed areas would be hand-seeded with native plant species in November 2010. An attached figure shows all affected areas. Drill pads associated with groundwater monitoring wells MV-4 and MV-5 are each approximately 250 feet (ft)

422

FINAL ENVIRONMENTAL ASSESSMENT FOR ENVIRONMENTAL SAFETY AND  

Broader source: Energy.gov (indexed) [DOE]

- - FOR ENVIRONMENTAL SAFETY AND HEALTH ANALYTICAL LABORATORY PROJECT NO. 94-AA-01 PANTEX PLANT AMAFsLLo, TEXAS June 1995 U.S. Department of E n e r g y Albuquerque Operations office Amarillo Area Office Pantex Plant P.O. Box 30030 Amarillo, Texas 79120 DISTRl6UTlON OF THIS DOCUMENT IS CMLtMmD FINAL ENVIRONMENTAL ASSESSMENT FOR June 1995 1 I U.S. Department of Energy Albuquerque Operations Office Amarillo Area m i c e Pantex Plant P.O. Box 30030 Amarillo, Texas 79120 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. . --.-- - . . _ . I . . . . , . . . . . . . . . . - I I I TABLE OF CONTENTS m EXECUTIVESUMMARY .............................................. 1 1.0 PURPOSE AND NEED FOR AGENCY ACTION

423

PPPL Site Environmental Report  

SciTech Connect (OSTI)

Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratorys Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on?site and is certified for analyzing radiological and non?radiological parameters through the New Jersey Department of Environmental Protections Laboratory Certification Program, Certification Number 12471. Non?radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the Annual Site Environmental Report for 2011, are documented and certified to be correct.

Virginia Finley, Robeert Sheneman and Jerry Levine

2012-12-21T23:59:59.000Z

424

CEQ Environmental Justice Guidance  

Broader source: Energy.gov (indexed) [DOE]

JUSTICE JUSTICE Guidance Under the National Environmental Policy Act Council on Environmental Quality Executive Office of the President Old Executive Office Building, Room 360 Washington, D.C. 20502 (202)395-5750 http://www.whitehouse.gov/CEQ/ December 10, 1997 ii Table of Contents I. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. Executive Order 12898 and the Presidential Memorandum . . . . . . . . . . . . . 3 III. Executive Order 12898 and NEPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. NEPA Generally . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 B. Principles for Considering Environmental Justice under NEPA . . . . . . . . . . . . . 8 1. General Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 2. Additional Considerations . . . . . . . . . . . . . . . . . . . . . .

425

Ethics to guide environmental action  

Science Journals Connector (OSTI)

Ethics to guide environmental action ... "Environmental Ethics: Choices for Concerned Citizens" is advertised as "a timely guide" for persons wanting "a balanced yet ecologically conscious life-style." ...

1980-12-08T23:59:59.000Z

426

Adaptive Sampling for Environmental Robotics  

E-Print Network [OSTI]

186, 2003. S. Thrun, Robotics Mapping: A survey, Exploringtechnique to environmental robotics applications includingSampling for Environmental Robotics Mohammad Rahimi , ,

Mohammad Rahimi; Richard Pon; Deborah Estrin; William J. Kaiser; Mani Srivastava; Gaurav S. Sukhatme

2003-01-01T23:59:59.000Z

427

Biological & Environmental Research Abstracts Database  

Office of Scientific and Technical Information (OSTI)

Welcome to the Biological and Environmental Research Abstracts Database The U.S. Department of Energy's Office of Biological and Environmental Research (BER) conducts research in...

428

Environmental Protection | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and environmental emissions. Argonne's environmental policy commits the laboratory to conduct experiments, facility operations, construction and all other activities in an...

429

NREL: Sustainable NREL - Environmental Stewardship  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

excellent environmental stewardship of its campuses into a highly replicable sustainability strategy, minimizing the environmental impacts of the lab's activities. Through...

430

Environmental Protection and Natural Resources  

E-Print Network [OSTI]

moved forward, environmentalists and Mexican stakeholders59 Stat. 1219. U.S. Environmental Protection Agency (EPA).1992. Integrated Environmental Plan for the Mexican-U.S.

Snchez-Rodrguez, Roberto; Mumme, Stephen

2010-01-01T23:59:59.000Z

431

Environmental Impact and Sustainability Assessment  

Science Journals Connector (OSTI)

As already mentioned, electricity is one of the energy inputs for hydrogen production; therefore, its generation cost, efficiency, and environmental impact become important parameters for environmentally benign a...

Ibrahim Dincer; Anand S. Joshi

2013-01-01T23:59:59.000Z

432

Comprehensive Environmental Response, Compensation and Recovery Act  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Comprehensive Environmental Response, Compensation and Recovery Act (CERCLA) Comprehensive Environmental Response, Compensation and Recovery Act (CERCLA) Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, also known as "Superfund") in response to a growing national concern about the release of hazardous substances from abandoned waste sites. Under CERCLA Congress gave the federal government broad authority to regulate hazardous substances, to respond to hazardous substance emergencies, and to develop long-term solutions for the Nation's most serious hazardous waste problems. CERCLA also created a Hazardous Substance Response Trust Fund, supported by an excise tax on feedstock chemicals and petroleum, to pay for cleanup activities at abandoned waste sites. In 1986 CERCLA was reauthorized and amended by the Superfund Amendments and Reauthorization Act (SARA). SARA expanded the federal government's response authorities and clarified that federal facilities are subject to the same CERCLA requirements as private industry. The Community Environmental Response Facilitation Act of 1992 amended the CERCLA provisions dealing with federal activities on any real property owned by the government. It requires the federal government to identify those parts of that real property where no hazardous substance had been stored, released, or disposed of.

433

FINAL ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

434

Notices ENVIRONMENTAL PROTECTION AGENCY  

Broader source: Energy.gov (indexed) [DOE]

076 Federal Register 076 Federal Register / Vol. 77, No. 250 / Monday, December 31, 2012 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9006-8] Notice of Intent: Designation of an Expanded Ocean Dredged Material Disposal Site (ODMDS) off Charleston, South Carolina AGENCY: U.S. Environmental Protection Agency (EPA) Region 4. ACTION: Notice of Intent to prepare an Environmental Assessment (EA) for the designation of an expanded ODMDS off Charleston, South Carolina. Purpose: EPA has the authority to designate ODMDSs under Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1401 et seq.). It is EPA's policy to prepare a National Environmental Policy Document for all ODMDS designations (63 FR 58045, October 1998). FOR FURTHER INFORMATION, TO

435

ENVIRONMENTAL COMPLIANCE (EC)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL COMPLIANCE (EC) OBJECTIVE EC.1: LANL has established and implemented an Environmental Compliance program to ensure safe accomplishment of work and operations within the requirements of the BIO, TSRs, SER, and regulatory permits for WCRR Facility activities. Sufficient numbers of qualified personnel, as well as adequate facilities and equipment, are available to support WCRRF operations. (CRs 1, 4, 6, 7, 9) CRITERIA 1. WCRRF has implemented the requirements for hazardous materials and waste management programs, as described in the WCRRF BIO and TSRs (WCRRF TSRs 5.6.9 and 5.10.2). 2. Environmental permits required for WCRR operations have been met. Processes are in place to ensure that these requirements are maintained. Environmental regulations include Resource

436

RMOTC - Testing - Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Environmental Deer at RMOTC Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. RMOTC offers industrial infrastructure and has dedicated sites for long- and short-term environmental testing projects. It also maintains a close working relationship with the Wyoming Oil & Gas Conservation Commission and the Wyoming Department of Environmental

437

Preliminary Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1731 Bonneville Power Administration May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Revision Sheet for Final Environmental Assessment Revision Sheet for the Walla Walla-Tucannon River Transmission Line Rebuild Project Final Environmental Assessment DOE/EA-1731 Summary This revision sheet documents the changes to be incorporated into the Walla Walla-Tucannon River Transmission Line Rebuild Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final

438

Draft Supplemental Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

439

Uncertainty in environmental economics  

E-Print Network [OSTI]

In a world of certainty, the design of environmental policy is relatively straightforward, and boils down to maximizing the present value of the flow of social benefits minus costs. But the real world is one of considerable ...

Pindyck, Robert S.

2006-01-01T23:59:59.000Z

440

Environmental report 1992  

SciTech Connect (OSTI)

Lawrence Livermore National Laboratory (LLNL), a US Department of Energy facility operated by the University of California, serves as a national resource of scientific, technical, and engineering capability with a special focus on national security. During 1992, the Environmental Protection Department conducted sampling of air, sewage effluent, ground water, surface water, soil, vegetation and foodstuffs, and took measurements of environmental radiation. It performed more than 150,000 analyses of environmental samples. The analytical results are summarized in the chapters that follow, along with evaluations of the impact of radioactive and nonradioactive materials, a discussion of the effects of LLNL operations on the environment, and a summary of the activities undertaken to comply with local, state, and federal environmental laws.

Wilt, G.C. [ed.; Gallegos, G.M.; Wander, S.M. [and others

1992-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Environmentally safe fluid extractor  

DOE Patents [OSTI]

An environmentally safe fluid extraction device for use in mobile laboratory and industrial settings comprising a pump, compressor, valving system, waste recovery tank, fluid tank, and a exhaust filtering system.

Sungaila, Zenon F. (Orland Park, IL)

1993-01-01T23:59:59.000Z

442

Estimating environmental costs  

Science Journals Connector (OSTI)

Added demands on natural resources and proposed environmental regulations could potentially have a significant impact on the production and operational costs of information technology (IT). In this paper, we utilize an Economic Input-Output Life-Cycle ...

Kiara Corrigan; Amip Shah; Chandrakant Patel

2010-02-01T23:59:59.000Z

443

Environmental Approvals (Manitoba, Canada)  

Broader source: Energy.gov [DOE]

The Environmental Approvals Branch ensures that developments are regulated in a manner that protects the environment and public health, and sustains a high quality of life for present and future...

444

Graduate Studies Environmental Engineering  

E-Print Network [OSTI]

. The principal focus areas include: environmental biotechnology; water quality and treatment; wastewater collabora- tions in Atlanta with units at Emory Uni- versity and the US Centers for Disease Control

Storici, Francesca

445

Onderwerpscodes Chemie -Farmacie / Subject headings Chemistry -Pharmacy, 2009, April1 Rubrieken Chemie -Farmacie: Subject headings Chemistry -  

E-Print Network [OSTI]

chemie 07 Inorganic chemistry 11.14 - 08 Organische chemie 08 Organic chemistry 12.11 - 10 Didactics and priciples of chemistry 14.03 - 16 Vervolgwerken - Annuals 16 Book series and annuals 14Onderwerpscodes Chemie - Farmacie / Subject headings Chemistry - Pharmacy, 2009, April1 Rubrieken

Galis, Frietson

446

General Environmental Protection Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish environmental protection program requirements, authorities, and responsibilities for Department of Energy (DOE) Operations for assuring compliance with applicable Federal, State and local environmental protection laws and regulations, Executive Orders, and internal Department policies. Cancels DOE O 5480.1A. Para. 2b, 4b, and 4c of Chap. II and para. 2d and 3b of Chap. III canceled by DOE O 231.1.

1990-06-29T23:59:59.000Z

447

STATEMENT OF CONSIDERATIONS REQUEST BY ALSTOM ENVIRONMENTAL CONTROL SYSTEMS FOR AN ADVANCE  

Broader source: Energy.gov (indexed) [DOE]

ALSTOM ENVIRONMENTAL CONTROL SYSTEMS FOR AN ADVANCE ALSTOM ENVIRONMENTAL CONTROL SYSTEMS FOR AN ADVANCE WAIVER OF PATENT RIGHTS TO INVENTIONS MADE UNDER SUBCONTRACT QZ001 UNDER COOPERATIVE AGREEMENT DE-FC26-03NT41986; W(A) 05-004; CH-1268 As set out in the attached waiver petition and in subsequent discussions with DOE Patent Counsel, Alstom Environmental Control Systems (Alstom) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above subject subcontract. The waiver will apply only to inventions made by Alstom employees under the subcontract. Alstom is a subcontractor to ADA Environmental Solutions (ADA-ES). under the subject cooperative agreement. ADA-ES is eligible to retain title to its inventions pursuant to P.L. 96- 517. Referring to item 2 of Alstom's petition, the purpose of the subcontract is to evaluate full-

448

SUBJECT: CALCULATION OF JOB CREATION THROUGH RECOVERY ACT FUNDING...  

Broader source: Energy.gov (indexed) [DOE]

SUBJECT: CALCULATION OF JOB CREATION THROUGH RECOVERY ACT FUNDING SUBJECT: CALCULATION OF JOB CREATION THROUGH RECOVERY ACT FUNDING wpn10-14asep10-07aeecbg10-08a.pdf More...

449

Protection of Human Subjects in Research at NIST  

E-Print Network [OSTI]

the risk to the subjects. · Serve as safeguard to protect NIST from errors in ethical judgment #12;IRB

450

Public Invited to Comment on Draft Environmental Assessment for the  

Broader source: Energy.gov (indexed) [DOE]

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National Laboratory (INL) or Sandia National Laboratories (SNL). Transient testing involves placing fuel or material into the core of a nuclear reactor and subjecting it to short bursts of intense, high-power

451

EA-1853: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment Final Environmental Assessment EA-1853: Final Environmental Assessment Perrin Ranch Wind Energy Interconnection Project Perrin Ranch Wind submitted an interconnection request to Western in 2010 to interconnect the proposed project to the existing Moenkopi-Yavapai 500-kV transmission line. Western is responding to Perrin Ranch Wind's application for interconnection. Western adopted an Open Access Transmission Tariff (Tariff) for its transmission system, which is generally consistent with the Federal Energy Regulatory Commission's pro forma open access tariff. Under Western's Tariff, procedures for new interconnections to the transmission system apply to all eligible customers, consistent with all Western requirements and subject to environmental review under NEPA. In responding to that request, Western

452

The Office of Environmental Management technical reports: A bibliography  

SciTech Connect (OSTI)

The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995--that were published from October 1, 1996--September 30, 1997. This information is divided into the following categories: Miscellaneous, Focus Areas and Crosscutting Programs, Support Programs, Technology Integration and International Technology Exchange, are now included in the Miscellaneous category. The Office of Environmental Management within the Department of Energy (DOE) is responsible for environmental restoration, waste management, technology development and facility transition and management. Subjects include: subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations. 880 refs.

NONE

1998-07-01T23:59:59.000Z

453

Microsoft Word - DOE Subject Area Indic#2C05.doc  

Broader source: Energy.gov (indexed) [DOE]

Subject Subject Area Indicators and Key Word List for Restricted Data and Formerly Restricted Data July 2005 Subject Area Indicators and Key Word List 1 TABLE OF CONTENTS Purpose ...................................................................................................................................... 2 Background................................................................................................................................. 3 Difference Between Restricted Data (RD) and Formerly Restricted Data (FRD) and National Security Information (NSI) ........................................................................................ 4 Access to RD and FRD ...............................................................................................................

454

2010 Site Environmental Report  

SciTech Connect (OSTI)

Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

Ratel, K.; Lee, R; Remien, J; Hooda, B; Green, T; Williams, J; Pohlot, P; Dorsch, W; Paquette, D; Burke, J

2011-10-01T23:59:59.000Z

455

SRS Environmental Report 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Environmental Report Summary Environmental Report - 2012 Environmental Data / Maps - 2012 EMS Description Manual Environmental Dose Assessment Manual Environmental Policy SRAP SREL SRNS Annual Report Savannah River Remediation USFS-SR References SRS spacer Bottomland Hardwood Forest bottomland hardwood/floodplain forest Front Cover - David Scott of the Savannah River Ecology Laboratory (SREL) provided this year's cover photo. The photo was taken in the Mixed Swamp Forest Set-Aside, which is part of the Savannah River swamp. This Set-Aside is one of the original ten SREL habitat reserve areas selected in 1968 to represent a diversity of bottomland hardwood/floodplain forest communities of a southern river swamp system. Represented are aquatic, semi-aquatic, and terrestrial habitats associated with cypress-tupelo ponds, mixed hardwood sloughs, and mixed hardwood ridges. This Set-Aside is important because seasonally flooded hardwood forests are becoming increasingly rare habitats that are particularly vulnerable to habitat destruction and/or alteration due to drainage, water control projects, industrial or urban waste discharge, or power plant cooling effluents. The flower in the foreground is called Lizard's Tail (Latin name Saururus cernuus). It grows in a variety of aquatic habitats, but on SRS it can be particularly abundant in some of the swamp forests

456

1984 environmental monitoring report  

SciTech Connect (OSTI)

The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. A listing, as required by DOE Order 5484.1 of BNL facilities, of environmental agencies and permits is provided in the Environmental Program Information Section 3.0, Table B. Since the aquifer underlying Long Island has been designated a ''sole source'' aquifer, the Environmental Protection Agency (EPA) Drinking Water Standards have been used in the assessment of ground water data. However, the limits prescribed in the regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply system, i.e., one serving more than 25 individuals, and (2) the standards represent an annual average concentration. Since the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are employed as reference criteria to which the surveillance well data is compared. The standards also serve as guidance levels for any appropriate remedial action. 36 refs., 9 figs., 40 tabs.

Day, L.E.; Miltenberger, R.P.; Naidu, J.R. (eds.)

1985-04-01T23:59:59.000Z

457

NETL: Site Environmental Quality  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Environmental Quality Site Environmental Quality About NETL Site Environmental Quality - Certified to ISO 14001:2004 Questions about NETL's Environment, Safety and Health Management System may be directed to Michael Monahan, 304-285-4408, michael.monahan@netl.doe.gov. NETL has implemented an Environment, Safety and Health (ES&H) Management System, based on DOE's Integrated Safety Management System, the International Organization for Standardization (ISO) 14000 series, and the Occupational Health and Safety Assessment (OHSAS) 18000 series. While the original scope of the ES&H Management System included the Morgantown and Pittsburgh sites, in fiscal year 2010, the Albany site was incorporated into the existing ES&H Management System. In addition, all three sites underwent ISO 14001:2004 recertification audits and Morgantown and

458

SN Environmental Review (NEPA)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rates Rates You are here: SN Home page > Environment Environmental Review-NEPA Major Initiatives are the large projects that SNR is currently involved in. As new projects are added, and existing ones completed, you will find current information and updates in this area. Environmental Impact Statement-EIS Sacramento Area Voltage Support Trinity PUD Interconnection Projects Alternative Intake Project Transmission Line and Interconnection Delta-Mendota Canal / California Aqueduct Intertie (PDF - 17MB) Sutter Power Project San Luis Transmission Project Environmental Assessment-EA San Joaquin Valley Right-of-Way Maintenance Project North Area Right-of-Way Maintenance Project Sacramento Valley Right-of-Way Maintenance Project Categorical Exclusions-CX Cottonwood - Roseville OPGW Project CX (PDF - 6787KB)

459

Notices ENVIRONMENTAL PROTECTION AGENCY  

Broader source: Energy.gov (indexed) [DOE]

25 Federal Register 25 Federal Register / Vol. 76, No. 209 / Friday, October 28, 2011 / Notices ENVIRONMENTAL PROTECTION AGENCY [FRL-9484-2] Children's Health Protection Advisory Committee (CHPAC); Notice of Charter Renewal AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of Charter Renewal. Notice is hereby given that the Environmental Protection Agency (EPA) has determined that, in accordance with the provisions of the Federal Advisory Committee Act (FACA), 5 U.S.C. App.2. The Children's Health Protection Advisory Committee (CHPAC) is a necessary committee which is in the public interest. Accordingly, CHPAC will be renewed for an additional two- year period. The purpose of CHPAC is to provide advice and recommendations to the Administrator of EPA on issues

460

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Notices ENVIRONMENTAL PROTECTION AGENCY  

Broader source: Energy.gov (indexed) [DOE]

22 Federal Register 22 Federal Register / Vol. 75, No. 103 / Friday, May 28, 2010 / Notices ENVIRONMENTAL PROTECTION AGENCY [FRL-9156-1] Office of Research and Development; Ambient Air Monitoring Reference and Equivalent Methods: Designation of One New Equivalent Method AGENCY: Environmental Protection Agency. ACTION: Notice of the designation of one new equivalent method for monitoring ambient air quality. SUMMARY: Notice is hereby given that the Environmental Protection Agency (EPA) has designated, in accordance with 40 CFR Part 53, one new equivalent method for measuring concentrations of lead (Pb) in total suspended particulate matter (TSP) in the ambient air. FOR FURTHER INFORMATION CONTACT: Surender Kaushik, Human Exposure and Atmospheric Sciences Division (MD-D205-03), National Exposure

462

Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

463

The National Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Environmental Serving an Essential Research Park at Mission for 25 Years Savannah River Site This document is PL^LICLY EAWidg r _ Autho ing Official Daft " / 2 a_"7 Savannah River Site South Carolina Aiken * Augusta Georgia Miles 10 0 10 20 30 The University of Georgia Savannah River Ecology Laboratory Dear Reader, Early in 1970, President Richard M. Nixon endorsed and ordered the implementation of 10 recommendations he had received from the Office of Science and Technology sub- sequent to the concurrence of the newly formed Council on Environmental Quality. The tenth recommendation included the following statement: "In view of the importance of preserving natural areas throughout the world, the con- cerned Federal agencies should accelerate their efforts to set aside representative loca-

464

DOEEA-1203 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

203 203 ~ Environmental Assessment Trench 33 Widening in 21 8-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington ENVIRONMENTAL ASSESSMENT FOR TRENCH 33 WIDENING IN 21 8-W-5 LOW-LEVEL BURIAL GROUND, HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY RICHLAND, WASHINGTON JULY 1997 U.S. Department o f Energy DOE/ EA- 1203 This page intentionally left blank. Envi ronmental Assessment J u l y 1997 Portions of this document m y be iliegiile i n electronic image prodads. b a g s are pFoduced from the best adhble original dOCUXllent, DOE/EA-1203 U.S. Department o f Energy Preface PREFACE This envi ronmental assessment (EA) has been prepared t o assess potential environmental impacts associated with the U.S. Department o

465

The Environmental Chamber  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 The Environmental Chamber Al Hodgson and Richard Allen test methyl chloride exposures using the environmental chamber. On the second floor of an unremarkable building at LBL, researchers are using a room within a room to smoke out indoor air pollutants. The environmental chamber is a stainless-steel-lined room of 540 ft cubed (20 meters cubed) which can be operated in several ways to meet the needs of different research projects, including studies for which a very low background is required. Scientists of the Indoor Environment Program and their collaborators use the chamber as a controlled indoor environment to study the behavior of a variety of indoor pollutants ranging from cigarette smoke to volatile organic compounds (VOCs) from new carpets. At the moment, four projects use the facility. Principal investigator Al

466

Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

467

Summary Site Environmental Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Environmental Report Site Environmental Report for Calendar Year 2011 ANL-12/02 (Summary) Environment, Safety, and Quality Assurance Division Argonne National Laboratory Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor UChicago Argonne, LLC, nor any of their employees or officers, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

468

Environmental Survey preliminary report, Pinellas Plant, Largo, Florida  

SciTech Connect (OSTI)

The purpose of this report is to present the preliminary findings made during the Environmental Survey, conducted May 11 through 22, 1987, at the United States Department of Energy (DOE) Pinellas Plant in Largo, Florida. As a Preliminary Report, the contents are subject to revisions, which will be made in a forthcoming Interim Report, based on Albuquerque Operations Office review and comments on technical accuracy, the results of the sampling and analyses, and other information that may come to the Survey team's attention prior to issuance of the Interim Report. The Pinellas Plant is currently operated for DOE by the General Electric Company-Neutron Devices Department (GENDD). The Pinellas Survey is part of the larger DOE-wide Environmental Survey effort announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via no fault'' baseline Surveys, existing environmental problems are areas of environmental risk at DOE facilities and to rank them on a DOE-wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct these problems. Because the Survey is no fault'' and is not an audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. 55 refs., 37 figs., 37 tabs.

Not Available

1987-11-01T23:59:59.000Z

469

SECRETARIAL POLICY STATEMENT ON THE NATIONAL ENVIRONMENTAL POLICY ACT  

Broader source: Energy.gov (indexed) [DOE]

13, 1994 13, 1994 MEMORANDUM FOR SECRETARIAL OFFICERS AND HEADS OF FIELD ELEMENTS FROM: HAZEL R. O'LEARY /signature/ SUBJECT: NATIONAL ENVIRONMENTAL POLICY ACT POLICY STATEMENT Full compliance with the letter and spirit of the National Environmental Policy Act (NEPA), our national charter for protection of the environment, is an essential priority for the Department of Energy, consistent with our core values. We are fully committed to pursuing excellence in all areas of environment, safety, and health, including NEPA activities. The Department's openness initiative underscores the need for public access to information and involvement in our actions. The NEPA process is a valuable planning tool and an opportunity to

470

Product acceptance environmental and destructive testing for reliability.  

SciTech Connect (OSTI)

To determine whether a component is meeting its reliability requirement during production, acceptance sampling is employed in which selected units coming off the production line are subjected to additional environmental and/or destructive tests that are within the normal environment space to which the component is expected to be exposed throughout its life in the Stockpile. This report describes what these tests are and how they are scored for reliability purposes. The roles of screens, Engineering Use Only tests, and next assembly product acceptance testing are also discussed, along with both the advantages and disadvantages of environmental and destructive testing.

Dvorack, Michael A.; Kerschen, Thomas J.; Collins, Elmer W.

2007-08-01T23:59:59.000Z

471

Environmental conflicts in Texas coastal counties, 1977-1983  

E-Print Network [OSTI]

ENVIRONMENTAL CONFLICTS IN TEXAS COASTAL COUNTIES, 1977-1983 A Thesis by VALERIE JAN GUNTER Submitted to the Graduate College of Texas AAN University in partial fulfillment of the requirement for the degree of EASTER OF SCIE4CE August 19B5... Major Subject: Sociology ENVIRONMENTAL CONFLICTS IN TEXAS COASTAL COUNTIES, 1977 198$ A Thesis by Valerie J. Gunter Approved as to style and content by: Chairwoman Dr. Barbara Finlay Member Dr. Lauriston R. King Me r Dr. Wm, Alex McIntosh Se...

Gunter, Valerie Jan

1985-01-01T23:59:59.000Z

472

Norsk Hydro's environmental report  

Science Journals Connector (OSTI)

This article describes the background to Norsk Hydro's decision to produce the U.K.'s first audited environmental report, the mechanics of its production, its findings and how it was subsequently used to achieve other objectives in the U.K., both for Norsk Hydro and for industry in general.

Charles Duff

1992-01-01T23:59:59.000Z

473

Danish Environmental Protection Agency  

E-Print Network [OSTI]

10 Waste from the building and construction sector 12 Packaging waste 14 Waste from households 16 treatment into consideration already at the design of products and by using less environmentally harmful products. This is in line with the integrated product policy of the Danish Ministry of Environ- ment

Columbia University

474

Best Environmental Management Practices  

E-Print Network [OSTI]

Best Environmental Management Practices Farm Animal Production Land Application of Manure management practices to avoid polluting surface or groundwater. 1. Public and private water wells Public pollution of surface waters increases. Therefore, to avoid this risk, manure P loadings should be managed

475

United States Environmental Protection  

E-Print Network [OSTI]

Public Health and Environmental Radiation Protection Standards for Yucca Mountain, Nevada (40 CFR Part 197)--Final Rule Response to Comments Document #12;Yucca Mountain Standards Response to Comments Standards for Yucca Mountain, Nevada 40 CFR Part 197 June, 2001 Office of Radiation and Indoor Air U

476

Environmentally Brookhaven Science Associates  

E-Print Network [OSTI]

(biobased content), Energy Policy Act of 2005 (alternative fuels/vehicles), Clean Air Act (non Preferable Purchasing http://www.hss.doe.gov/pp/epp/ Alternative Fuels/Vehicles http://www1.eere.energy Other Preferred Procurement · Alternative fuels/vehicles · Electronic Product Environmental Assessment

477

Exploring Civil and Environmental  

E-Print Network [OSTI]

Engineers % of Total Architectural, Engineering, and Related Services 135,000 53 Federal, State, and Local1 CEE 100 Exploring Civil and Environmental Engineering #12;CEE 100 Schedule--Winter 2010 https Geotechnical Engineering January 27 Steve Muench Construction Engineering February 3 Greg Miller Structural

478

Environmental Career Fair  

E-Print Network [OSTI]

of its developmental plan for the agri- cultural zone (PDZA). Fifty aspirants, both farmers and owners and Development, Environmental Biology, Environment, Natural Resource Sciences & Management, Biodiversity partners through the process, from first contact to the signing of notarized agreement. Managed since its

Kambhampati, Patanjali

479

1996 Site environmental report  

SciTech Connect (OSTI)

The FEMP is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the FEMP in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the FEMP. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1996 SER provides the general public as well as scientists and engineers with the results from the ongoing Environmental Monitoring Program. Also included in this report is information concerning the FEMP progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (EPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish are presented here. All information presented in this summary is discussed more fully in the main body of this report.

NONE

1997-06-01T23:59:59.000Z

480

Department of Environmental  

E-Print Network [OSTI]

Department of Environmental Safety DIVISION OF ADMINISTRATIVE AFFAIRS LOCKOUT TAGOUT PLAN (CONTROL, MD 20742-3133 (301) 405-3960 FAX (301) 314-9294 #12;#12;Lockout Tagout Program i Table of Contents Implementing Lockout/Tagout 7 I. Preparation for Shutdown 8 II. Shutdown of Machine 8 III. Return Equipment

Lathrop, Daniel P.

Note: This page contains sample records for the topic "kec-4 subject environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Environmental Health and Safety  

E-Print Network [OSTI]

Environmental Health and Safety EHS-FORM-022 v.1.1 Page 1 of 1 Laboratory safety self NA Radioactive materials [MNI Radiation Safety Manua ]l MNI: contact Christian Janicki christian.janicki@mcgill.ca 8888-43866 ANSI (American National Standards Institute) Class 3b or 4 lasers Biological safety

Shoubridge, Eric

482

Environmental Health and Safety  

E-Print Network [OSTI]

Environmental Health and Safety Approved by Document No. Version Date Replaces Page EHS EHS-FORM-072 1.0 15-May-2008 N/A 1 of 4 Laboratory Safety Orientation Checklist Name (Print) Department Supervisor Date (DD/MM/YY) A Laboratory Safety Orientation Checklist should be completed within one month

Shoubridge, Eric

483

ENVIRONMENTAL, HEALTH AND SAFETY  

E-Print Network [OSTI]

ENVIRONMENTAL, HEALTH AND SAFETY PROGRAMS SPRING 2012 Including: Free Information Session New Program in Health and Safety CONTINUING AND PROFESSIONAL EDUCATION #12;2 Our Health and Safety Programs Workplace Health and Safety Certificate Program For every dollar invested in workplace safety, organizations

California at Davis, University of

484

Environmental Preferences LIGHT: Sunny.  

E-Print Network [OSTI]

Environmental Preferences LIGHT: Sunny. SOIL: Well-drained, deep sandy loam. FERTILITY: Medium beans BeansDiane Relf, Extension Specialist, Horticulture, Virginia Tech Alan McDaniel, Extension Specialist, Horticulture, Virginia Tech are yellow and waxy in appearance, their flavor is only subtly

Liskiewicz, Maciej

485

United States Environmental Protection  

E-Print Network [OSTI]

quality in public water systems; remediation of contaminated sites, sediments and ground water; preventionUnited States Environmental Protection Agency Hydrogeologic Framework, Ground-Water Geochemistry/R-02/008 January 2002 Hydrogeologic Framework, Ground-Water Geochemistry, and Assessment of Nitrogen

486

1999 SITE ENVIRONMENTAL REPORT  

SciTech Connect (OSTI)

Throughout the scientific community, Brookhaven National Laboratory (BNL) is renowned for its leading-edge research in physics, medicine, chemistry, biology, materials, and the environment. BNL is committed to supporting its world-class scientific research with an internationally recognized environmental protection program. The 1999 Site Environmental Report (SER) summarizes the status of the Laboratory's environmental programs and performance, including the steady progress towards cleaning up the site and fully integrating environmental stewardship into all facets of the Laboratory's mission. BNL is located on 5,265 acres of pine barrens in Suffolk County in the center of Long Island, New York. The Laboratory is situated above a sole source aquifer at the headwaters of the Peconic River; therefore, protecting ground and surface water quality is a special concern. Approximately 3,600 acres of the site are undeveloped and serve as habitat for a wide variety of animals and plants, including one New York State endangered species, the tiger salamander, and two New York State threatened species, the banded sunfish and the stiff goldenrod. Monitoring, preserving, and restoring these ecological resources is a high priority for the Laboratory.

ENGEL-COX,J.; ZIMMERMAN,E.; LEE,R.; WILLIAMS,J.; GREEN,T.; PAQUETTE,D.; HOODA,B.; SCARPITTA,S.; GENZER,P.; ET AL

2000-09-01T23:59:59.000Z

487

Environmental Impacts of Nanotechnology  

E-Print Network [OSTI]

Treatment Plant Society Wastewater Treatment plant Not Everyone Lives Upstream >75% of the US population is served by centralized wastewater treatment facilities #12;US Environmental Protection Agency (and NSF releases nano-Ag and Ag+ into sewage water · Bacteria in wastewater treatment plant biosorb silver · Some

Zhang, Junshan

488

Department of Environmental  

E-Print Network [OSTI]

-3960 (Industrial Hygiene, Occupational Safety, Hazardous Waste Management, Fire Protection, Radiation SafetyDepartment of Environmental Safety DIVISION OF ADMINISTRATIVE AFFAIRS LEAD MANAGEMENT PLAN Original-3960 FAX (301) 314-9294 #12;Lead Management Plan i Emergency and Assistance Telephone Numbers UM Emergency

Rubloff, Gary W.

489

Environmental Protection Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To implement sound stewardship practices that are protective of the air, water, land, and other natural and cultural resources impacted by the Department of Energy (DOE) operations and by which DOE cost effectively meets or exceeds compliance with applicable environmental; public health; and resource protection laws, regulations, and DOE requirements. Cancels DOE 5400.1 and DOE N 450.4.

2003-01-15T23:59:59.000Z

490

Emerging Environmental Issues  

Science Journals Connector (OSTI)

Emerging environmental issues are issues that may someday be of concern but that have not yet been generally recognized. A review of such issues that have occurred over the last 50 years reveals that many of them have erupted rather suddenly (...

Ted Munn; Peter Timmerman; Anne Whyte

2000-07-01T23:59:59.000Z

491

Nicolas Bouleau The Environmental  

E-Print Network [OSTI]

Nicolas Bouleau The Environmental Violence of Volatility How Neoliberal Economy Obscures the economy 1. Finitude Limits to growth · The models · Causes of the neoliberal turning point 2 models and their refinements · Qualitative aspects of stochastic processes · Vulnerability

Boyer, Edmond

492

ENVIRONMENTAL CONSTRUCTABILITY IN  

E-Print Network [OSTI]

Engineering Storm Water Quality #12;Linear Construction Flux · Natural resource protection is a design and phase of construction, from start to finish · Be fair for both engineer and contractor · Develop.eqb.state.mn.us/EnvRevGuidanceDocuments.htm Highway Project Design Process (HPDP) Subject Guidance Accessibility Requirements Air Quality Airports

Minnesota, University of

493

Safety & Environmental Protection Services  

E-Print Network [OSTI]

of controlled waste (also sometimes known as directive waste). With the exception of radioactive waste all waste produced by Universities is controlled waste. Radioactive waste is subject to different legislative or to the environment, that is, to ensure that it is not special waste or radioactive waste. Waste electronic

Glasgow, University of

494

Environmental Impact Statements and Environmental Assessments Status Chart  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statements and Environmental Assessments Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart This chart represents anticipated activity and is not a commitment for documentation or dates. October 21, 2011 EIS-0426: Notice of Extension of Public Comment Period for the Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada September 26, 2011 EA-1792: Finding of No Significant Impact University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine September 26, 2011 EA-1792: Final Environmental Assessment University of Maine's DeepWater Offshore Floating Wind Turbine Testing and

495

MasterEnvironmental Engineering Department of Civil, environmental  

E-Print Network [OSTI]

management (including also earth observation), urban water management, environmental systems design and waste students major in two core areas of environmental engineering out of the following: water resource core areas: Water resource management (including also earth observation), urban water management

Giger, Christine

496

NREL Annual Environmental Performance Reports (Annual Site Environmental Reports)  

Office of Energy Efficiency and Renewable Energy (EERE)

Every year NREL prepares an Environmental Performance Report meeting the requirements of an Annual Site Environmental Report (ASER) per DOE Order 231.1B. The report is written to inform the public,...

497

EA-1693: Transmission Services Facility, Clark County, Washington |  

Broader source: Energy.gov (indexed) [DOE]

3: Transmission Services Facility, Clark County, Washington 3: Transmission Services Facility, Clark County, Washington EA-1693: Transmission Services Facility, Clark County, Washington Summary DOE will prepare an EA to evaluate the potential environmental impacts from the proposed three-to-five story office building that would be constructed to meet the Leadership in Energy and Environmental Design (LEED) Gold standard in energy efficiency and sustainability, near Bonneville Power Administration's (BPA) existing Dittmer Building. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/TSF_Project/ For more information, contact: Stephanie Breeden Environmental Project Manager Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, Oregon, 97208-3621 Direct telephone number 503-230-5192 Toll-free telephone number 1-800-282-3713

498

Policy on Environmental Health and Safety Policy on Environmental Health  

E-Print Network [OSTI]

and regulations, and in accordance with recognized health, safety and sound environmental management practices to identify or develop procedures that meet regulatory compliance and support best safety and environmental. The university expects adherence to good environmental health and safety practices and compliance with laws

Sridhar, Srinivas

499

Requests are subject to edit upon entering into SIS+ ACTIVITY LOG  

E-Print Network [OSTI]

Subject code *** *** *** *** 12/15/2008 EHS NUTR 280 Ecotourism Subject code/prereq *** *** *** *** 12

Farritor, Shane

500

Fish under influence: a macroecological analysis of relations between fish species richness and environmental gradients among European tidal estuaries  

E-Print Network [OSTI]

Fish under influence: a macroecological analysis of relations between fish species richness Estuarine fish assemblages are subject to a great environmental variability that largely depends on both a macroecological approach aiming to identify the main environmental factors that structure fish assemblages among

Paris-Sud XI, Université de