National Library of Energy BETA

Sample records for kaplan hydro turbines

  1. Evaluation of Blade-Strike Models for Estimating the Biological Performance of Large Kaplan Hydro Turbines

    SciTech Connect (OSTI)

    Deng, Zhiqun; Carlson, Thomas J.; Ploskey, Gene R.; Richmond, Marshall C.

    2005-11-30

    BioIndex testing of hydro-turbines is sought as an analog to the hydraulic index testing conducted on hydro-turbines to optimize their power production efficiency. In BioIndex testing the goal is to identify those operations within the range identified by Index testing where the survival of fish passing through the turbine is maximized. BioIndex testing includes the immediate tailrace region as well as the turbine environment between a turbine's intake trashracks and the exit of its draft tube. The US Army Corps of Engineers and the Department of Energy have been evaluating a variety of means, such as numerical and physical turbine models, to investigate the quality of flow through a hydro-turbine and other aspects of the turbine environment that determine its safety for fish. The goal is to use these tools to develop hypotheses identifying turbine operations and predictions of their biological performance that can be tested at prototype scales. Acceptance of hypotheses would be the means for validation of new operating rules for the turbine tested that would be in place when fish were passing through the turbines. The overall goal of this project is to evaluate the performance of numerical blade strike models as a tool to aid development of testable hypotheses for bioIndexing. Evaluation of the performance of numerical blade strike models is accomplished by comparing predictions of fish mortality resulting from strike by turbine runner blades with observations made using live test fish at mainstem Columbia River Dams and with other predictions of blade strike made using observations of beads passing through a 1:25 scale physical turbine model.

  2. Design considerations for a large Kaplan turbine governor

    SciTech Connect (OSTI)

    Zarlenga, B.A.

    1995-12-31

    This paper discusses the design features for the digital electronic and hydraulic mechanical governor equipment as used to control the largest Kaplan turbine in the Western Hemisphere. The turbine has a 9.5 meter runner blade diameter and is rated at 154 MW output capacity. This governor is being provided for all twenty Kaplan turbines supplied for the Yacyreta project located on the border between Argentina and Paraguay. The digital governor design utilizes a dual processor arrangement that has eight different governor operating control modes with a special automatic bumpless transfer feature to permit smooth gate and blade movements when changing modes. The governor speed sensing and redundant speed switch sensors were provided with a shaft mounted tooth disk, and three proximity pick-ups. Basic design considerations are discussed concerning the governor hydraulic pressure system used due to the large size of the turbine servomotor volume employed. A 17,800 liter volume hydraulic reservoir is supplied with additional features such as a continuous operating filtration circuit to provide oil cooling and filtration of the oil. The hydraulic pump sizing criterion used for the main pressure supply and the booster pumps is also discussed.

  3. Micro Hydro Kinetic Turbines from Smart Hydro Power | Open Energy...

    Open Energy Info (EERE)

    Hydro Kinetic Turbines from Smart Hydro Power Jump to: navigation, search << Return to the MHK database homepage Tauchturbine.jpg Technology Profile Project(s) where this...

  4. MHK Technologies/HydroCoil Turbine | Open Energy Information

    Open Energy Info (EERE)

    HydroCoil Turbine < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage HydroCoil Turbine.jpg Technology Profile Primary Organization HydroCoil...

  5. Application of biological design criteria and computational fluid dynamics to investigate fish survival in Kaplan turbines

    SciTech Connect (OSTI)

    Garrison, Laura A.; Fisher, Jr., Richard K.; Sale, Michael J.; Cada, Glenn

    2002-07-01

    One of the contributing factors to fish injury in a turbine environment is shear stress. This paper presents the use of computational fluid dynamics (CFD) to display and quantify areas of elevated shear stress in the Wanapum Kaplan turbine operating at four different flow conditions over its operating range. CFD observations will be compared to field test observations at the same four flow conditions. Methods developed here could be used to facilitate the design of turbines and related water passages with lower risks of fish injury.

  6. Quantifying Barotrauma Risk to Juvenile Fish during Hydro-turbine Passage

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Serkowski, John A.; Ebner, Laurie L.; Sick, Mirjam; Brown, Richard S.; Carlson, Thomas J.

    2014-03-15

    We introduce a method for hydro turbine biological performance assessment (BioPA) to bridge the gap between field and laboratory studies on fish injury and turbine engineering design. Using this method, a suite of biological performance indicators is computed based on simulated data from a computational fluid dynamics (CFD) model of a proposed hydro turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. If the relationship between the dose of an injury mechanism (stressor) and frequency of injury (dose-response) is known from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from various turbine designs, engineers and biologists can identify the more-promising designs and operating conditions to minimize hydraulic conditions hazardous to passing fish. In this paper, the BioPA method is applied to estimate barotrauma induced mortal injury rates for Chinook salmon exposed to rapid pressure changes in Kaplan-type hydro turbines. Following the description of the general method, application of the BioPA to estimate the probability of mortal injury from exposure to rapid decompression is illustrated using a Kaplan hydro turbine at the John Day Dam on the Columbia River in the Pacific Northwest region of the USA. The estimated rates of mortal injury increased from 0.3% to 1.7% as discharge through the turbine increased from 334 to 564 m3/s for fish assumed to be acclimated to a depth of 5 m. The majority of pressure nadirs occurred immediately below the runner blades, with the lowest values in the gap at the blade tips and just below the leading edge of the blades. Such information can help engineers focus on problem areas when designing new turbine runners to be more fish-friendly than existing units.

  7. Simulated passage through a modified Kaplan turbine pressure regime: A supplement to "Laboratory Studies of the Effects of Pressure and Dissolved Gas Supersaturation on Turbine-Passed Fish"

    SciTech Connect (OSTI)

    Abernethy, C. S.; Amidan, B. G.; Cada, G. F.

    2002-04-01

    A previous test series (Abernethy et al. 2001) evaluated the effects of passage through a Kaplan turbine under the “worst case” pressure conditions. For this series of tests, pressure changes were modified to simulate passage through a Kaplan turbine under a more “fish-friendly” mode of operation. The results were compared to results from Abernethy et al. (2001). These data indicate that altered operating conditions that raise the nadir (low point) of the turbine passage pressure regime could reduce the injury and mortality rates of fish during turbine passage. Fall Chinook salmon were not injured or killed when subjected to the modified pressure scenario. Bluegills were more sensitive to pressure effects than fall Chinook salmon, but injury and mortality rates were lower under the modified Kaplan pressure regime. This improvement was particularly significant among fish that were acclimated to greater water pressures (traveling at greater depth).

  8. Hydro Review: Computational Tools to Assess Turbine Biological Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Hydro Review: Computational Tools to Assess Turbine Biological Performance Hydro Review: Computational Tools to Assess Turbine Biological Performance This review covers the BioPA method used to analyze the biological performance of proposed designs to help ensure the safety of fish passing through the turbines at the Priest Rapids Dam in Grant County, Washington. Computational Tools to Assess Turbine Biological Performance (483.71 KB) More Documents & Publications

  9. Quantifying mortal injury of juvenile Chinook salmon exposed to simulated hydro-turbine passage

    SciTech Connect (OSTI)

    Brown, Richard S.; Carlson, Thomas J.; Gingerich, Andrew J.; Stephenson, John R.; Pflugrath, Brett D.; Welch, Abigail E.; Langeslay, Mike; Ahmann, Martin L.; Johnson, Robert L.; Skalski, John R.; Seaburg, Adam; Townsend, Richard L.

    2012-02-01

    A proportion of juvenile Chinook salmon and other salmonids travel through one or more turbines during seaward migration in the Columbia and Snake River every year. Despite this understanding, limited information exists on how these fish respond to hydraulic pressures found during turbine passage events. In this study we exposed juvenile Chinook salmon to varied acclimation pressures and subsequent exposure pressures (nadir) to mimic the hydraulic pressures of large Kaplan turbines (ratio of pressure change). Additionally, we varied abiotic (total dissolved gas, rate of pressure change) and biotic (condition factor, fish length, fish weight) factors that may contribute to the incidence of mortal injury associated with fish passing through hydro-turbines. We determined that the main factor associated with mortal injury of juvenile Chinook salmon during simulated turbine passage was the ratio between acclimation and nadir pressures. Condition factor, total dissolved gas, and the rate of pressure change were found to only slightly increase the predictive power of equations relating probability of mortal injury to conditions of exposure or characteristics of test fish during simulated turbine passage. This research will assist engineers and fisheries managers in operating and improving hydroelectric facility efficiency while minimizing mortality and injury of turbine-passed juvenile Chinook salmon. The results are discussed in the context of turbine development and the necessity of understanding how different species of fish will respond to the hydraulic pressures of turbine passage.

  10. Turbulent Flow Effects on the Biological Performance of Hydro-Turbines

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2014-08-25

    The hydro-turbine industry uses Computational Fluid Dynamics (CFD) tools to predict the flow conditions as part of the design process for new and rehabilitated turbine units. Typically the hydraulic design process uses steady-state simulations based on Reynolds-Averaged Navier-Stokes (RANS) formulations for turbulence modeling because these methods are computationally efficient and work well to predict averaged hydraulic performance, e.g. power output, efficiency, etc. However, in view of the increasing emphasis on environmental concerns, such as fish passage, the consideration of the biological performance of hydro-turbines is also required in addition to hydraulic performance. This leads to the need to assess whether more realistic simulations of the turbine hydraulic environment -those that resolve unsteady turbulent eddies not captured in steady-state RANS computations- are needed to better predict the occurrence and extent of extreme flow conditions that could be important in the evaluation of fish injury and mortality risks. In the present work, we conduct unsteady, eddy-resolving CFD simulations on a Kaplan hydro-turbine at a normal operational discharge. The goal is to quantify the impact of turbulence conditions on both the hydraulic and biological performance of the unit. In order to achieve a high resolution of the incoming turbulent flow, Detached Eddy Simulation (DES) turbulence model is used. These transient simulations are compared to RANS simulations to evaluate whether extreme hydraulic conditions are better captured with advanced eddy-resolving turbulence modeling techniques. The transient simulations of key quantities such as pressure and hydraulic shear flow that arise near the various components (e.g. wicket gates, stay vanes, runner blades) are then further analyzed to evaluate their impact on the statistics for the lowest absolute pressure (nadir pressures) and for the frequency of collisions that are known to cause mortal injury in fish

  11. Simulated Passage Through A Modified Kaplan Turbine Pressure Regime: A Supplement to "Laboratory Studies of the Effects of Pressure and Dissolved Gas Supersaturation on Turbine-Passed Fish"

    SciTech Connect (OSTI)

    Abernethy, Cary S.; Amidan, Brett G.; Cada, G. F.

    2002-03-15

    Migratory and resident fish in the Columbia River basin are exposed to stresses associated with hydroelectric power production, including pressure changes during turbine passage and dissolved gas supersaturation (resulting from the release of water from the spillway). The responses of fall Chinook salmon and bluegill sunfish to these two stresses, both singly and in combination, were investigated in the laboratory. A previous test series (Abernethy et al. 2001) evaluated the effects of passage through a Kaplan turbine under the ?worst case? pressure conditions. For this series of tests, pressure changes were modified to simulate passage through a Kaplan turbine under a more ?fish-friendly? mode of operation. The results were compared to results from Abernethy et al. (2001). Fish were exposed to total dissolved gas (TDG) levels of 100%, 120%, or 135% of saturation for 16-22 hours at either surface (101 kPa) or 30 ft (191 kPa) of pressure, then held at surface pressure at 100% saturation for a 48-hour observation period. Sensitivity of fall Chinook salmon to gas supersaturation was slightly higher than in the previous test series, with 15% mortality for surface-acclimated fish at 120% TDG, compared to 0% in the previous tests.

  12. Microsoft PowerPoint - 2014 HydroPower - Stockton Turbine Replacement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at 52 MW Single vertical axis Kaplan unit New turbine runner has 7 blades versus 6 on the old runner New turbine runner has 7 blades versus 6 on the old runner ...

  13. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  14. Hydro Review: Computational Tools to Assess Turbine Biological...

    Broader source: Energy.gov (indexed) [DOE]

    Computational Tools to Assess Turbine Biological Performance (483.71 KB) More Documents & Publications Hydropower R&D: Recent Advances in Turbine Passage Technology Environmental ...

  15. MHK Technologies/The Davis Hydro Turbine | Open Energy Information

    Open Energy Info (EERE)

    turbine foils to move proportionately faster than the speed of the surrounding water Computer optimized cross flow design ensures that the rotation of the turbine is...

  16. Assessment of Strike of Adult Killer Whales by an OpenHydro Tidal Turbine Blade

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Elster, Jennifer L.; Jones, Mark E.; Watson, Bruce E.; Copping, Andrea E.; Watkins, Michael L.; Jepsen, Richard A.; Metzinger, Kurt

    2012-02-01

    Report to DOE on an analysis to determine the effects of a potential impact to an endangered whale from tidal turbines proposed for deployment in Puget Sound.

  17. Wanapum Dam Advanced Hydro Turbine Upgrade Project: Part 2 - Evaluation of Fish Passage Test Results Using Computational Fluid Dynamics

    SciTech Connect (OSTI)

    Dresser, Thomas J.; Dotson, Curtis L.; Fisher, Richard K.; Graf, Michael J.; Richmond, Marshall C.; Rakowski, Cynthia L.; Carlson, Thomas J.; Mathur, Dilip; Heisey, Paul G.

    2007-10-10

    This paper, the second part of a 2 part paper, discusses the use of Computational Fluid Dynamics (CFD) to gain further insight into the results of fish release testing conducted to evaluate the modifications made to upgrade Unit 8 at Wanapum Dam. Part 1 discusses the testing procedures and fish passage survival. Grant PUD is working with Voith Siemens Hydro (VSH) and the Pacific Northwest National Laboratory (PNNL) of DOE and Normandeau Associates in this evaluation. VSH has prepared the geometry for the CFD analysis corresponding to the four operating conditions tested with Unit 9, and the 5 operating conditions tested with Unit 8. Both VSH and PNNL have conducting CFD simulations of the turbine intakes, stay vanes, wicket gates, turbine blades and draft tube of the units. Primary objectives of the analyses were: • determine estimates of where the inserted fish passed the turbine components • determine the characteristics of the flow field along the paths calculated for pressure, velocity gradients and acceleration associated with fish sized bodies • determine the velocity gradients at the structures where fish to structure interaction is predicted. • correlate the estimated fish location of passage with observed injuries • correlate the calculated pressure and acceleration with the information recorded with the sensor fish • utilize the results of the analysis to further interpret the results of the testing. This paper discusses the results of the CFD analyses made to assist the interpretation of the fish test results.

  18. Collaboration inspires nuclear engineering student Alexis Kaplan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alexis Kaplan Collaboration inspires nuclear engineering student Alexis Kaplan Researcher designs a system that improves nuclear energy security August 27, 2013 Alexis Kaplan Alexis Kaplan has climbed many mountains: Wheeler Peak in New Mexico, 14-ners in Colorado, and Machu Picchu in Peru. When she is not doing science look for her outdoors or visiting another country. Inspired by the world-class nuclear research environment and invigorated by the small city's proximity to outdoor activities,

  19. Smart Hydro Power GmbH | Open Energy Information

    Open Energy Info (EERE)

    Smart Hydro Power GmbH Address: Alte Traubinger Str. 17 Place: Garatshausen Country: Germany Zip: 82340 Sector: Marine and Hydrokinetic Product: Micro Hydro Kinetic Turbine...

  20. Hydro-electric generator

    SciTech Connect (OSTI)

    Vauthier, P.

    1980-06-03

    The efficiency of a hydro-electric generator is improved by providing open-ended hollow tubes having influx ends proximate the axis and efflux ends proximate the periphery of a fan-bladed turbine. The jets of water developed by rotation of the fanbladed turbine are directed against turbine vanes at the periphery of the fan blades. The device is particularly suitable for mounting in a water current such as in an ocean current or river.

  1. Turbines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Turbines Hydrogen Turbine photo Hydrogen Turbines The NETL Hydrogen Turbine Program manages a research, development, and demonstration (RD&D) portfolio of projects designed to remove environmental concerns about the future use of fossil fuels through development of revolutionary, near-zero-emission advanced turbine technologies. More Information Advanced Research The American Recovery and Reinvestment Act (ARRA) funds gas turbine technology research and development to improve the efficiency,

  2. EA-2017: Braddock Locks and Dam Hydro Electric Project | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Energy (DOE) is proposing to authorize the expenditure of federal funding to Hydro Green Energy, LLC to fabricate, install, and operate one interchangeable Modular Bulb Turbine...

  3. Quantifying Fl Value of Hydro in Transmission Grid | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quantifying Fl Value of Hydro in Transmission Grid 72hydrogridserviceseprikey.ppt (3.96 MB) More Documents & Publications Enviro effects of hydrokinetic turbines on fish ...

  4. MHK Technologies/The Ocean Hydro Electricity Generator Plant...

    Open Energy Info (EERE)

    The Ocean Hydro Electricity Generator Plant.jpg Technology Profile Primary Organization Free Flow 69 Technology Type Click here Axial Flow Turbine Technology Description The O H E...

  5. MHK Technologies/Open Centre Turbine | Open Energy Information

    Open Energy Info (EERE)

    Centre Turbine < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Open Centre Turbine.jpg Technology Profile Primary Organization OpenHydro Group...

  6. MHK Technologies/Tidal Stream Turbine | Open Energy Information

    Open Energy Info (EERE)

    Turbine < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Tidal Stream Turbine.jpg Technology Profile Primary Organization StatoilHydro co owned...

  7. MHK Technologies/Wells Turbine for OWC | Open Energy Information

    Open Energy Info (EERE)

    Turbine for OWC < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Wells Turbine for OWC.png Technology Profile Primary Organization Voith Hydro...

  8. Turbine Imaging Technology Assessment

    SciTech Connect (OSTI)

    Moursund, Russell A.; Carlson, Thomas J.

    2004-12-31

    The goal of this project was to identify and evaluate imaging alternatives for observing the behavior of juvenile fish within an operating Kaplan turbine unit with a focus on methods to quantify fish injury mechanisms inside an operating turbine unit. Imaging methods are particularly needed to observe the approach and interaction of fish with turbine structural elements. This evaluation documents both the opportunities and constraints for observing juvenile fish at specific locations during turbine passage. The information may be used to acquire the scientific knowledge to make structural improvements and create opportunities for industry to modify turbines and improve fish passage conditions.

  9. Appendix HYDRO: Hydrological Investigations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HYDRO-2014 Hydrological Investigations United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix HYDRO-2014 Table of Contents HYDRO-1.0 Hydrological Studies HYDRO-2.0 Optimization of Culebra Monitoring Well Network HYDRO-3.0 Geochemical Analyses HYDRO-4.0 Steel-Cased Well Reconfiguration and Replacement HYDRO-5.0 Geological Information HYDRO-6.0 Hydraulic Test Interpretation HYDRO-7.0 Monitoring

  10. FCRPS Hydro Projects (generation/hydro)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydro Power FCRPS Hydro Projects FCRPS Information Kiosk Current Hydrological Info Fish Funding Agreement FCRPS Definitions Wind Power Monthly GSP BPA White Book Dry Year...

  11. Brigham City Hydro Generation Project

    SciTech Connect (OSTI)

    Ammons, Tom B.

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  12. Hydro | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History Hydro Jump to: navigation, search Hydro or hydroelectric systems capture the energy in naturally flowing water and convert it to electricity. Related Links List...

  13. Hydro | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History Hydro (Redirected from Hydropower) Jump to: navigation, search Hydro or hydroelectric systems capture the energy in naturally flowing water and convert it to...

  14. Development of the helical reaction hydraulic turbine. Final...

    Office of Scientific and Technical Information (OSTI)

    helical reaction hydraulic turbine. Final technical report, July 1, 1996--June 30, 1998 Gorlov, A. 16 TIDAL AND WAVE POWER; 17 WIND ENERGY; 13 HYDRO ENERGY; PROGRESS REPORT;...

  15. Turnbull Hydro LLC | Open Energy Information

    Open Energy Info (EERE)

    Turnbull Hydro LLC Jump to: navigation, search Name: Turnbull Hydro LLC Place: Montana Sector: Hydro Product: Montana-based small hydro developer. References: Turnbull Hydro LLC1...

  16. Invervar Hydro | Open Energy Information

    Open Energy Info (EERE)

    Invervar Hydro Jump to: navigation, search Name: Invervar Hydro Place: United Kingdom Product: Scottish private project developer. References: Invervar Hydro1 This article is a...

  17. Types of Hydropower Turbines | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbines Types of Hydropower Turbines There are two main types of hydro turbines: impulse and reaction. The type of hydropower turbine selected for a project is based on the height of standing water-referred to as "head"-and the flow, or volume of water, at the site. Other deciding factors include how deep the turbine must be set, efficiency, and cost. Terms used on this page are defined in the glossary. Impulse Turbine The impulse turbine generally uses the velocity of the water to

  18. Lac Courte Oreilles Hydro Dam Assessment

    SciTech Connect (OSTI)

    Weaver, Jason; Meyers, Amy

    2014-12-31

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  19. Manitoba Hydro | Open Energy Information

    Open Energy Info (EERE)

    Hydro Jump to: navigation, search Name: Manitoba Hydro Place: Winnipeg, Manitoba, Canada Zip: R3M 3T1 Sector: Hydro Product: Manitoba Hydro is the province's major energy...

  20. Dharmshala Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    Dharmshala Hydro Power Ltd Jump to: navigation, search Name: Dharmshala Hydro Power Ltd. Place: Hyderabad, India Sector: Hydro Product: Hyderabad-based small hydro project...

  1. Ascent Hydro Projects Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ascent Hydro Projects Ltd Jump to: navigation, search Name: Ascent Hydro Projects Ltd. Place: Pune, Maharashtra, India Zip: 411007 Sector: Hydro Product: Pune-based small hydro...

  2. Neora Hydro Ltd | Open Energy Information

    Open Energy Info (EERE)

    Neora Hydro Ltd Jump to: navigation, search Name: Neora Hydro Ltd. Place: Kolkata, West Bengal, India Sector: Hydro Product: Kolkata-based small hydro project developer....

  3. EA-281 Manitoba Hydro | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manitoba Hydro EA-281 Manitoba Hydro Order authorizing Manitoba Hydro to export electric energy to Canada. PDF icon EA-281 Manitoba Hydro More Documents & Publications EA-281-B

  4. Hydro Power (pbl/generation)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation > Generation Hydro Power FCRPS Hydro Projects FCRPS Information Kiosk Current Hydrological Info Fish Funding Agreement FCRPS Definitions Wind Power Monthly GSP BPA White...

  5. HydroVision International

    Broader source: Energy.gov [DOE]

    The HydroVision International Conference and Exhibition offers attendees countless opportunities to network, share best practices, meet with product and service providers, and more.  Held over five...

  6. Turbine FAQs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Turbine FAQs faq-header-big.jpg TURBINES - BASICS Q: What is a turbine? A: A turbine is a mechanical device that extracts energy from a fluid flow and turns it into useful work. A ...

  7. North American Hydro | Open Energy Information

    Open Energy Info (EERE)

    Hydro Jump to: navigation, search Name: North American Hydro Place: Schofield, Wisconsin Zip: 54476 Sector: Hydro Product: Focused on developing, upgrading, owning, and operating...

  8. Dharamshala Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    Dharamshala Hydro Power Ltd Jump to: navigation, search Name: Dharamshala Hydro Power Ltd Place: New Delhi, Delhi (NCT), India Zip: 110008 Sector: Hydro Product: Delhi-based...

  9. Bhilangana Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    Bhilangana Hydro Power Ltd Jump to: navigation, search Name: Bhilangana Hydro Power Ltd. Place: Noida, Uttar Pradesh, India Zip: 201301 Sector: Hydro Product: Noida-based small...

  10. Hydro Green Energy | Open Energy Information

    Open Energy Info (EERE)

    Green Energy Jump to: navigation, search Name: Hydro Green Energy Place: Houston, Texas Zip: 77056 Sector: Hydro Product: Hydro Green Energy is a project developer and integrator...

  11. Advanced Hydro Solutions | Open Energy Information

    Open Energy Info (EERE)

    Hydro Solutions Jump to: navigation, search Name: Advanced Hydro Solutions Place: Fairlawn, Ohio Zip: 44333 Sector: Hydro Product: Ohio-based company seeking to develop...

  12. Himalayan Hydro P Ltd | Open Energy Information

    Open Energy Info (EERE)

    P Ltd Jump to: navigation, search Name: Himalayan Hydro (P) Ltd. Place: Hyderabad, Andhra Pradesh, India Zip: 500 033 Sector: Hydro Product: Hyderabad-based small hydro project...

  13. Cauvery Hydro Energy Ltd | Open Energy Information

    Open Energy Info (EERE)

    Cauvery Hydro Energy Ltd Jump to: navigation, search Name: Cauvery Hydro Energy Ltd. Place: Bangalore, Karnataka, India Zip: 560080 Sector: Hydro Product: Bangalore based small...

  14. Computational Tools to Assess Turbine Biological Performance

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Serkowski, John A.; Rakowski, Cynthia L.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2014-07-24

    Public Utility District No. 2 of Grant County (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now more than 50 years old. Plans are underway to refit these aging turbines with new runners. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when upgrading the turbines. In this paper, a method for turbine biological performance assessment (BioPA) is demonstrated. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We present an application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  15. Turbine imaging technology assessment

    SciTech Connect (OSTI)

    Moursund, R. A.; Carlson, T. J.

    2004-12-01

    The goal of this project was to identify and evaluate imaging technologies for observing juvenile fish within a Kaplan turbine, and specifically that would enable scientists to determine mechanisms of fish injury within an operating turbine unit. This report documents the opportunities and constraints for observing juvenile fish at specific locations during turbine passage. These observations were used to make modifications to dam structures and operations to improve conditions for fish passage while maintaining or improving hydropower production. The physical and hydraulic environment that fish experience as they pass through the hydroelectric plants were studied and the regions with the greatest potential for injury were defined. Biological response data were also studied to determine the probable types of injuries sustained in the turbine intake and what types of injuries are detectable with imaging technologies. The study grouped injury-causing mechanisms into two categories: fluid (pressure/cavitation, shear, turbulence) and mechanical (strike/collision, grinding/pinching, scraping). The physical constraints of the environment, together with the likely types of injuries to fish, provided the parameters needed for a rigorous imaging technology evaluation. Types of technology evaluated included both tracking and imaging systems using acoustic technologies (such as sonar and acoustic tags) and optic technologies (such as pulsed-laser videography, which is high-speed videography using a laser as the flash). Criteria for determining image data quality such as frame rate, target detectability, and resolution were used to quantify the minimum requirements of an imaging sensor.

  16. Ayyappa Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ayyappa Hydro Power Ltd Jump to: navigation, search Name: Ayyappa Hydro Power Ltd. Place: Kolkata, West Bengal, India Zip: 700 017 Sector: Hydro Product: Kolkata-based small hydro...

  17. Gehra Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    Gehra Hydro Power Ltd Jump to: navigation, search Name: Gehra Hydro Power Ltd. Place: New Delhi, Delhi (NCT), India Zip: 110008 Sector: Hydro Product: Delhi-based small hydro...

  18. Jiuquan Sanyuan Hydro Power | Open Energy Information

    Open Energy Info (EERE)

    Hydro Power Jump to: navigation, search Name: Jiuquan Sanyuan Hydro Power Place: China Sector: Hydro Product: Developer of 26.55MW Gansu hydro plant in China. References: Jiuquan...

  19. KKK Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    KKK Hydro Power Ltd Jump to: navigation, search Name: KKK Hydro Power Ltd. Place: Faridabad, Haryana, India Zip: 121 003 Sector: Hydro Product: Faridabad-based small hydro project...

  20. HydroGen | Open Energy Information

    Open Energy Info (EERE)

    HydroGen Jump to: navigation, search Logo: HydroGen Name: HydroGen Address: Head Office, 9 GreenMeadows Place: Cardiff, Wales Country: United Kingdom Sector: Hydro, Hydrogen,...

  1. New Hydropower Turbines to Save Snake River Steelhead | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Hydropower Turbines to Save Snake River Steelhead New Hydropower Turbines to Save Snake River Steelhead May 24, 2010 - 1:23pm Addthis Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40 miles east of Portland, Ore., that are meant to save more fish. The next-generation machines at Ice Harbor will be even more advanced. | Photo Courtesy of Voith Hydro Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40

  2. HydroPulse Drilling

    SciTech Connect (OSTI)

    J.J. Kolle

    2004-04-01

    Tempress HydroPulse{trademark} tool increases overbalanced drilling rates by generating intense suction pulses at the drill bit. This report describes the operation of the tool; results of pressure drilling tests, wear tests and downhole drilling tests; and the business case for field applications. The HydroPulse{trademark} tool is designed to operate on weighted drilling mud at conventional flow rates and pressures. Pressure drilling tests confirm that the HydroPulse{trademark} tool provides 33% to 200% increased rate of penetration. Field tests demonstrated conventional rotary and mud motor drilling operations. The tool has been operated continuous for 50 hours on weighted mud in a wear test stand. This level of reliability is the threshold for commercial application. A seismic-while-drilling version of the tool was also developed and tested. This tool was used to demonstrate reverse vertical seismic profiling while drilling an inclined test well with a PDC bit. The primary applications for the HydroPulse{trademark} tool are deep onshore and offshore drilling where rate of penetration drives costs. The application of the seismic tool is vertical seismic profiling-while-drilling and look-ahead seismic imaging while drilling.

  3. Simulating Turbine-Turbine Interaction

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Simulating Turbine-Turbine Interaction - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future ...

  4. Thirumala Hydro Power P Ltd | Open Energy Information

    Open Energy Info (EERE)

    Thirumala Hydro Power P Ltd Jump to: navigation, search Name: Thirumala Hydro Power (P) Ltd. Place: Guntur, Andhra Pradesh, India Sector: Hydro Product: Guntur-based small hydro...

  5. EA-281-A Manitoba Hydro | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -A Manitoba Hydro EA-281-A Manitoba Hydro Order authorizing Manitoba Hydro to export electric energy to Canada. PDF icon EA-281-A Manitoba Hydro More Documents & Publications ...

  6. EA-281-B Manitoba Hydro | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -B Manitoba Hydro EA-281-B Manitoba Hydro Order authorizing Manitoba Hydro to export electric energy to Canada. PDF icon EA-281-B Manitoba Hydro More Documents & Publications ...

  7. V B Hydro Projects Ltd | Open Energy Information

    Open Energy Info (EERE)

    Hydro Projects Ltd Jump to: navigation, search Name: V. B. Hydro Projects Ltd. Place: Pathankot, Punjab, India Zip: 145001 Sector: Hydro Product: Pathankot-based small hydro...

  8. Real-time hydro coordination and economic hydro optimization

    SciTech Connect (OSTI)

    Dasigenis, A.T.; Garcia-San Pedro, A.R.

    1995-12-31

    This paper addresses the real-time aspects of the Hydro-Thermal Coordination problem. It describes the real-time modeling and monitoring of hydro resources, and the use of the resulting real-time hydraulic data in the on-line Economic Dispatch algorithm. A variable head, hydro loss model is incorporated that allows for on-line changes to the hydro topology. The method presented provides the operator with a current view of the available water resources, enables the validation of the real-time hydro data received from the field, and enables real-time optimization of the Hydro-Thermal Unit Commitment plan. The implementation of this approach on the Iberdrola system in Spain is described.

  9. M. D. Nornberg, N. Z. Taylor, C. B. Forest, K. Rahbarnia, and E. Kaplan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization of magnetic amplification by flow constraints in turbulent liquid sodiuma) M. D. Nornberg, N. Z. Taylor, C. B. Forest, K. Rahbarnia, and E. Kaplan Citation: Physics of Plasmas (1994-present) 21, 055903 (2014); doi: 10.1063/1.4875335 View online: http://dx.doi.org/10.1063/1.4875335 View Table of Contents: http://scitation.aip.org/content/aip/journal/pop/21/5?ver=pdfcov Published by the AIP Publishing Articles you may be interested in Vortex shedding in flow past an inclined flat

  10. Fish-Friendly Turbine Making a Splash in Water Power | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fish-Friendly Turbine Making a Splash in Water Power Fish-Friendly Turbine Making a Splash in Water Power October 21, 2011 - 10:29am Addthis A computer simulation of the Alden Fish-Friendly Turbine. A computer simulation of the Alden Fish-Friendly Turbine. Rajesh Dham Hydropower Technology Team Lead How does it work? The Alden turbine has three blades, no gaps, is bigger and rotates more slowly than typical hydro turbines. At peak performance, an Alden turbine should convert about 94 percent of

  11. FCRPS Definitions (hydro/fcrps)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Reclamation (USBR). Portion of Cost Allocated to Power The cost allocated to the power generating portion of hydro projects. Flood control, navigation, and irrigation are...

  12. Identifying the Effects on Fish of Changes in Water Pressure during Turbine Passage

    SciTech Connect (OSTI)

    Becker, James M.; Abernethy, Cary S.; Dauble, Dennis D.

    2003-09-01

    Migratory and resident fish in the Columbia River are exposed to stresses associated with hydroelectric power production, including pressure changes during turbine passage and dissolved gas supersaturation. We investigated the responses of fall Chinook salmon (Oncorhynchus tshawytscha), rainbow trout (Oncorhynchus mykiss), and bluegill sunfish (Lepomis macrochirus) to these two stresses, singly and in combination, in the laboratory. Fish were exposed to total dissolved gas levels of 100%, 120%, or 135% of saturation while being held at either surface or 30 ft of pressure. Some of these fish were then subjected to decreases in pressure simulating passage through a Kaplan turbine under “worst case” (to 0.1 atmospheres) or more “fish friendly” (to 0.5 atmospheres) scenarios. Surface- and depth-acclimated Chinook salmon and bluegill, with no exposure to dissolved gas above ambient levels, were subjected to decreases in pressure simulating passage through a bulb turbine under “worst case” (to 0.68 atmospheres) or more “fish friendly” (to 1.0 atmospheres) scenarios. Bluegill, the most pressure-sensitive among the three species, incurred injuries that ranged from mild (internal hemorrhaging) (bulb turbine) to death (Kaplan turbine). For each type of turbine passage, bluegill acclimated to 30 ft depth and subjected to the more severe pressure nadir were more susceptible to injury/death. However, even control bluegill (i.e., not subjected to simulated turbine passage) experienced mild to moderate injury from rapidly ascending from 30 ft of pressure to surface pressure. The dissolved gas level had only a small additive effect on the injury/death rate of bluegill subjected to simulated Kaplan turbine passage. Thus, while physoclistous fish, such as bluegill, appear to be susceptible to injury from any rapid pressure decrease, those that are most severe (e.g., Kaplan turbine passage) are likely to be most injurious. Chinook salmon and rainbow trout were much less susceptible

  13. HydroChina Corporation | Open Energy Information

    Open Energy Info (EERE)

    China Zip: 100011 Sector: Hydro, Wind energy Product: Beijing-based firm focused on hydro and wind power development. References: HydroChina Corporation1 This article is a...

  14. Norsk Hydro ASA | Open Energy Information

    Open Energy Info (EERE)

    Norsk Hydro ASA Jump to: navigation, search Name: Norsk Hydro ASA Place: Oslo, Norway Zip: NO-0283 Sector: Hydro, Renewable Energy, Solar Product: Oslo-based energy and aluminium...

  15. Loads Analysis of a Floating Offshore Wind Turbine Using Fully Coupled Simulation: Preprint

    SciTech Connect (OSTI)

    Jonkman, J. M.; Buhl, M. L., Jr.

    2007-06-01

    This paper presents the use of fully coupled aero-hydro-servo-elastic simulation tools to perform a loads analysis of a 5-MW offshore wind turbine supported by a barge with moorings, one of many promising floating platform concepts.

  16. Aquaphile sarl Hydro Gen | Open Energy Information

    Open Energy Info (EERE)

    Aquaphile sarl Hydro Gen Jump to: navigation, search Name: Aquaphile sarl Hydro Gen Address: 210 Le Vrennic Place: Landda Zip: 29870 Region: France Sector: Marine and Hydrokinetic...

  17. Belij Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    Belij Hydro Power Ltd Jump to: navigation, search Name: Belij Hydro Power Ltd Place: New Delhi, Delhi (NCT), India Zip: 110008 Product: Private investorproject developer which has...

  18. Beck Mickle Hydro Ltd | Open Energy Information

    Open Energy Info (EERE)

    Mickle Hydro Ltd Jump to: navigation, search Name: Beck Mickle Hydro Ltd. Place: Lancashire, England, United Kingdom Zip: LA4 4AY Product: Development of a technology, which...

  19. Geo Hydro Supply | Open Energy Information

    Open Energy Info (EERE)

    Hydro Supply Jump to: navigation, search Name: Geo Hydro Supply Address: 997 State Route 93 NW Place: Sugarcreek, Ohio Zip: 44681 Sector: Geothermal energy Phone Number:...

  20. Voith Hydro Wavegen Limited | Open Energy Information

    Open Energy Info (EERE)

    Voith Hydro Wavegen Limited Jump to: navigation, search Name: Voith Hydro Wavegen Limited Region: United Kingdom Sector: Marine and Hydrokinetic Website: www.wavegen.co.uk This...

  1. The Small Hydro Company | Open Energy Information

    Open Energy Info (EERE)

    Hydro Company Jump to: navigation, search Name: The Small Hydro Company Place: Oxfordshire, United Kingdom Product: Privately-held owner, developer and operator of assets....

  2. Village Hydro Technology Module | Open Energy Information

    Open Energy Info (EERE)

    Hydro Technology Module Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Village Hydro Technology Module AgencyCompany Organization: World Bank Sector: Energy Focus...

  3. Florida Hydro Inc | Open Energy Information

    Open Energy Info (EERE)

    search Name: Florida Hydro Inc Place: Palatka, Florida Zip: 32177 Sector: Hydro, Hydrogen Product: Develops electrical generation and hydrogen production devices. Coordinates:...

  4. A fish-eye view of riverine hydropower systems. Understanding the biological response to turbine passage

    SciTech Connect (OSTI)

    Pracheil, Brenda M.; DeRolph, Christopher R.; Schramm, Michael P.; Bevelhimer, Mark S.

    2016-01-01

    One-way connectivity maintained by fish passing through hydropower turbines in fragmented rivers can be important to population dynamics, but can introduce a new and significant source of mortality due to turbine-associated mortality. Sources of mortality during downstream turbine passage can come from several sources including blade strike, shear forces, cavitation, or pressure decreases, and parsing the contributions of these individual forces is important for advancing and deploying turbines that minimize these impacts to fishes. We used a national hydropower database and conducted a systematic review of the literature to accomplish three goals: (1) report on the spatial distribution of turbine types and generation capacities in the USA, (2) determine fish mortality rates among turbine types and fish species and (3) examine relationships between physical forces similar to those encountered during fish turbine passage and fish injury and mortality. We found that while Francis turbines generate 56% of all US hydropower and have the highest associated fish mortality of any turbine type, these turbines are proportionally understudied compared to less-common and less injury-associated Kaplan turbines, particularly in the Pacific Northwest. While juvenile salmonid species in actual or simulated Kaplan turbine conditions were the most commonly studied, the highest mortality rates were reported in percid fishes passing through Francis turbines. Also, although there are several mechanisms of turbine-associated injury, barotrauma was the most commonly studied with swim bladder rupture, exopthalmia, eye gas bubbles, and prolapsed cloaca being the most serious symptoms associated with rapid pressure decreases. Future studies should focus on understanding which species are most at-risk to turbine passage mortality and, subsequently, increasing the diversity of taxonomy and turbine types in evaluations of turbine mortality.

  5. Designs and applications for floating-hydro power systems in small streams

    SciTech Connect (OSTI)

    Rehder, J.B.

    1983-01-01

    The project focuses on an appropriate technology for small-scale hydro power: floating waterwheels and turbines. For background, relic and existing systems such as early floating mills, traditional Amish waterwheels, and micro-hydro systems are examined. In the design phase of the project, new designs for Floating Hydro Power Systems include: an analysis of floatation materials and systems; a floating undershot waterwheel design; a floating cylinder (fiberglass storage tank) design; a submerged tube design; and a design for a floating platform with submerged propellers. Finally, in the applications phase, stream flow data from East Tennessee streams are used in a discussion of the potential applications of floating hydro power systems in small streams.

  6. A fish-eye view of riverine hydropower systems. Understanding the biological response to turbine passage

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Pracheil, Brenda M.; DeRolph, Christopher R.; Schramm, Michael P.; Bevelhimer, Mark S.

    2016-01-01

    One-way connectivity maintained by fish passing through hydropower turbines in fragmented rivers can be important to population dynamics, but can introduce a new and significant source of mortality due to turbine-associated mortality. Sources of mortality during downstream turbine passage can come from several sources including blade strike, shear forces, cavitation, or pressure decreases, and parsing the contributions of these individual forces is important for advancing and deploying turbines that minimize these impacts to fishes. We used a national hydropower database and conducted a systematic review of the literature to accomplish three goals: (1) report on the spatial distribution of turbinemore » types and generation capacities in the USA, (2) determine fish mortality rates among turbine types and fish species and (3) examine relationships between physical forces similar to those encountered during fish turbine passage and fish injury and mortality. We found that while Francis turbines generate 56% of all US hydropower and have the highest associated fish mortality of any turbine type, these turbines are proportionally understudied compared to less-common and less injury-associated Kaplan turbines, particularly in the Pacific Northwest. While juvenile salmonid species in actual or simulated Kaplan turbine conditions were the most commonly studied, the highest mortality rates were reported in percid fishes passing through Francis turbines. Also, although there are several mechanisms of turbine-associated injury, barotrauma was the most commonly studied with swim bladder rupture, exopthalmia, eye gas bubbles, and prolapsed cloaca being the most serious symptoms associated with rapid pressure decreases. Future studies should focus on understanding which species are most at-risk to turbine passage mortality and, subsequently, increasing the diversity of taxonomy and turbine types in evaluations of turbine mortality.« less

  7. Pumped Hydro | Open Energy Information

    Open Energy Info (EERE)

    Introduction caption:Pumped Storage diagram at TVA's Racoon mountain Pumped Hydro is an energy storage technique where water is used as a medium in order to store energy. During...

  8. Midwest Hydro Users Group Meeting

    Broader source: Energy.gov [DOE]

    The Midwest Hydro Users Group will be holding their annual Fall meeting on November 12th and 13th in Wausau, Wisconsin.  An Owners-only meeting on the afternoon of the 12th followed by a full...

  9. Vindhyachal Hydro Power Ltd VHPL | Open Energy Information

    Open Energy Info (EERE)

    Vindhyachal Hydro Power Ltd VHPL Jump to: navigation, search Name: Vindhyachal Hydro Power Ltd. (VHPL) Place: Mumbai, Maharashtra, India Zip: 400001 Sector: Hydro Product:...

  10. Yushan Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Yushan Hydro Power Development Co Ltd Jump to: navigation, search Name: Yushan Hydro Power Development Co. Ltd. Place: Chongqing, Jiangsu Province, China Zip: 405800 Sector: Hydro...

  11. Fengning Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Fengning Hydro Power Development Co Ltd Jump to: navigation, search Name: Fengning Hydro Power Development Co., Ltd. Place: Guizhou Province, China Sector: Hydro Product:...

  12. Madkini Hydro Power Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Madkini Hydro Power Pvt Ltd Jump to: navigation, search Name: Madkini Hydro Power Pvt Ltd. Place: Dehradun, Uttaranchal, India Zip: 248006 Sector: Hydro Product: Dehradun-based...

  13. Vijayalakshmi Hydro Power Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Vijayalakshmi Hydro Power Pvt Ltd Jump to: navigation, search Name: Vijayalakshmi Hydro Power Pvt. Ltd. Place: Bangalore, Karnataka, India Zip: 560 001 Sector: Hydro Product:...

  14. Longchuan Minhong Hydro power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Minhong Hydro power Co Ltd Jump to: navigation, search Name: Longchuan Minhong Hydro power Co. Ltd Place: Yunnan Province, China Zip: 678700 Sector: Hydro Product: China-based...

  15. Gunsola Hydro Power Generation Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Gunsola Hydro Power Generation Pvt Ltd Jump to: navigation, search Name: Gunsola Hydro Power Generation Pvt Ltd Place: Dehradun, Uttaranchal, India Sector: Hydro Product:...

  16. Jinxiu Guangneng Hydro Power Company Ltd | Open Energy Information

    Open Energy Info (EERE)

    Guangneng Hydro Power Company Ltd Jump to: navigation, search Name: Jinxiu Guangneng Hydro Power Company Ltd. Place: Guangxi Autonomous Region, China Zip: 530022 Sector: Hydro...

  17. Fujian Jinzaoqiao Hydro Power Limited Corporation | Open Energy...

    Open Energy Info (EERE)

    Jinzaoqiao Hydro Power Limited Corporation Jump to: navigation, search Name: Fujian Jinzaoqiao Hydro Power Limited Corporation Place: Ningde, Fujian Province, China Sector: Hydro...

  18. Janapadu Hydro Power Project Pvt Ltd JHPPPL | Open Energy Information

    Open Energy Info (EERE)

    Janapadu Hydro Power Project Pvt Ltd JHPPPL Jump to: navigation, search Name: Janapadu Hydro Power Project Pvt. Ltd.(JHPPPL) Place: Andhra Pradesh, India Zip: 522005 Sector: Hydro...

  19. Zhangping Huakou Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Zhangping Huakou Hydro Power Co Ltd Jump to: navigation, search Name: Zhangping Huakou Hydro Power Co Ltd Place: Zhangping, Fujian Province, China Sector: Hydro Product:...

  20. Him Kailash Hydro Power P Ltd | Open Energy Information

    Open Energy Info (EERE)

    Him Kailash Hydro Power P Ltd Jump to: navigation, search Name: Him Kailash Hydro Power (P) Ltd. Place: West Godavari District, Andhra Pradesh, India Zip: 434101 Sector: Hydro...

  1. Shri Shashi Hydro Electric Power P Ltd | Open Energy Information

    Open Energy Info (EERE)

    Shri Shashi Hydro Electric Power P Ltd Jump to: navigation, search Name: Shri Shashi Hydro Electric Power (P) Ltd. Place: Mandi, Himachal Pradesh, India Zip: 174401 Sector: Hydro...

  2. Shizong Heier Hydro power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Shizong Heier Hydro power Development Co Ltd Jump to: navigation, search Name: Shizong Heier Hydro power Development Co.Ltd Place: Yunnan Province, China Sector: Hydro Product:...

  3. Jiangxi Jiangwan Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Jiangwan Hydro Power Co Ltd Jump to: navigation, search Name: Jiangxi Jiangwan Hydro Power Co., Ltd. Place: Shangrao, China Zip: 344000 Sector: Hydro Product: China-based small...

  4. Guizhou Sanhe Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Hydro Power Development Co Ltd Jump to: navigation, search Name: Guizhou Sanhe Hydro Power Development Co.Ltd. Place: Guiyang, Guizhou Province, China Zip: 550002 Sector: Hydro...

  5. Libo Lidu Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Lidu Hydro Power Development Co Ltd Jump to: navigation, search Name: Libo Lidu Hydro Power Development Co.Ltd. Place: Guizhou Province, China Zip: 558400 Sector: Hydro Product:...

  6. Antu County Hengxin Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Antu County Hengxin Hydro Power Development Co Ltd Jump to: navigation, search Name: Antu County Hengxin Hydro Power Development Co., Ltd Place: China Zip: 133609 Sector: Hydro...

  7. Qingyuan Longjing Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Longjing Hydro Power Development Co Ltd Jump to: navigation, search Name: Qingyuan Longjing Hydro Power Development Co. Ltd. Place: Lishui City, China Zip: 323800 Sector: Hydro...

  8. Yu County Hydro electric Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    County Hydro electric Power Co Ltd Jump to: navigation, search Name: Yu County Hydro-electric Power Co., Ltd. Place: Shaanxi Province, China Zip: 45100 Sector: Hydro Product:...

  9. Ningshan Luotuoya Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ningshan Luotuoya Hydro Power Co Ltd Jump to: navigation, search Name: Ningshan Luotuoya Hydro Power Co. Ltd., Place: Ankang, Shaanxi Province, China Zip: 711600 Sector: Hydro...

  10. Leshan Kaiyuan Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Co Ltd Jump to: navigation, search Name: Leshan Kaiyuan Hydro Power Co., Ltd. Place: Leshan, Sichuan Province, China Zip: 614000 Sector: Hydro Product: Sichuan-based small hydro...

  11. Macaohe Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Macaohe Hydro Power Development Co Ltd Jump to: navigation, search Name: Macaohe Hydro Power Development Co., Ltd. Place: Tongren, Guizhou Province, China Sector: Hydro Product:...

  12. Zhongjing Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Zhongjing Hydro Power Development Co Ltd Jump to: navigation, search Name: Zhongjing Hydro Power Development Co., Ltd. Place: Guizhou Province, China Sector: Hydro Product:...

  13. Guizhou Anshun Sanchawan Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Anshun Sanchawan Hydro Power Co Ltd Jump to: navigation, search Name: Guizhou Anshun Sanchawan Hydro Power Co., Ltd. Place: Anshun, Guizhou Province, China Sector: Hydro Product:...

  14. Shimen Zhangjiadu Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Zhangjiadu Hydro Power Co Ltd Jump to: navigation, search Name: Shimen Zhangjiadu Hydro Power Co. Ltd. Place: Changde City, Hunan Province, China Zip: 415000 Sector: Hydro Product:...

  15. Jiangshan Jinlong hydro power development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jiangshan Jinlong hydro power development Co Ltd Jump to: navigation, search Name: Jiangshan Jinlong hydro power development Co. Ltd. Place: Jiangshan, China Sector: Hydro Product:...

  16. Sunan Longchanghe Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Sunan Longchanghe Hydro Power Co Ltd Jump to: navigation, search Name: Sunan Longchanghe Hydro Power Co., Ltd Place: Zhangye, Gansu Province, China Zip: 620721 Sector: Hydro...

  17. Kapil Mohan Associates Hydro Power Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Kapil Mohan Associates Hydro Power Pvt Ltd Jump to: navigation, search Name: Kapil Mohan & Associates Hydro Power Pvt. Ltd. Place: Chandigarh, Chandigarh, India Sector: Hydro...

  18. Qingyang Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Qingyang Hydro Power Development Co Ltd Jump to: navigation, search Name: Qingyang Hydro Power Development Co. Ltd. Place: Lishui City, China Zip: 323800 Sector: Hydro Product:...

  19. Huaiji County Huilian Hydro electric Group Company Limited |...

    Open Energy Info (EERE)

    Zip: 526400 Sector: Hydro Product: Hydro-electric project designer, constructor, and maintenance service provider. CLP Holding has 25% ownership of Huilian Hydro-electric....

  20. Sichuan Tianquan Xiacun Hydro Generation Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Xiacun Hydro Generation Co Ltd Jump to: navigation, search Name: Sichuan Tianquan Xiacun Hydro Generation Co. Ltd Place: Ya'an, Sichuan Province, China Zip: 625500 Sector: Hydro...

  1. Voith Hydro Ocean Current Technologies | Open Energy Information

    Open Energy Info (EERE)

    Ocean Current Technologies Jump to: navigation, search Name: Voith Hydro Ocean Current Technologies Place: Germany Sector: Hydro Product: Germany-based JV between Voith Hydro and...

  2. Paschim Hydro Energy Pvt Ltd PHEPL | Open Energy Information

    Open Energy Info (EERE)

    Paschim Hydro Energy Pvt Ltd PHEPL Jump to: navigation, search Name: Paschim Hydro Energy Pvt. Ltd. (PHEPL) Place: Hyderabad, Andhra Pradesh, India Zip: 500034 Sector: Hydro...

  3. Nagarjuna Hydro Energy Pvt Ltd NHEPL | Open Energy Information

    Open Energy Info (EERE)

    Hydro Energy Pvt Ltd NHEPL Jump to: navigation, search Name: Nagarjuna Hydro Energy Pvt. Ltd. (NHEPL) Place: Hyderabad, Andhra Pradesh, India Sector: Hydro Product: Hyderabad-based...

  4. Gowthami Hydro Electric Co P Ltd | Open Energy Information

    Open Energy Info (EERE)

    Hydro Electric Co P Ltd Jump to: navigation, search Name: Gowthami Hydro Electric Co. (P) Ltd. Place: Secunderabad, Andhra Pradesh, India Zip: 500 003 Sector: Hydro Product:...

  5. PP-54 Ontario Hydro Electric Power Commission | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, ...

  6. Sichuan Xingchen Hydro Investment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Xingchen Hydro Investment Co Ltd Jump to: navigation, search Name: Sichuan Xingchen Hydro Investment Co., Ltd. Place: Mianyang, Sichuan Province, China Zip: 617067 Sector: Hydro...

  7. Turbine system

    DOE Patents [OSTI]

    McMahan, Kevin Weston; Dillard, Daniel Jackson

    2016-05-03

    A turbine system is disclosed. The turbine system includes a transition duct having an inlet, an outlet, and a passage extending between the inlet and the outlet and defining a longitudinal axis, a radial axis, and a tangential axis. The outlet of the transition duct is offset from the inlet along the longitudinal axis and the tangential axis. The turbine system further includes a turbine section connected to the transition duct. The turbine section includes a plurality of shroud blocks at least partially defining a hot gas path, a plurality of buckets at least partially disposed in the hot gas path, and a plurality of nozzles at least partially disposed in the hot gas path. At least one of a shroud block, a bucket, or a nozzle includes means for withstanding high temperatures.

  8. AD Hydro Power Ltd ADHPL | Open Energy Information

    Open Energy Info (EERE)

    AD Hydro Power Ltd ADHPL Jump to: navigation, search Name: AD Hydro Power Ltd. (ADHPL) Place: Noida, Uttar Pradesh, India Zip: 201301 Sector: Hydro Product: Noida-based small hydro...

  9. MHK Technologies/Open HydroTurbine | Open Energy Information

    Open Energy Info (EERE)

    CrestEnergy Project(s) where this technology is utilized *MHK ProjectsPaimpol Brehat tidal farm Technology Resource Click here CurrentTidal Technology Description See Open...

  10. Hydro Research Program Seeking Graduate Student Applicants

    Broader source: Energy.gov [DOE]

    The Hydro Research Foundation is now accepting graduate student applications for its DOE-funded graduate student research program. The Hydro Research Awards Program is designed to spur innovation...

  11. Hydro Generation Ltd | Open Energy Information

    Open Energy Info (EERE)

    Services Product: Micro hydropower company. Provides technical services such as feasibility studies, mechanicalcivilelectical design. References: Hydro Generation Ltd1...

  12. Turbine Thermal Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Turbine Thermal Management Fact Sheets Research Team Members Key Contacts Turbine Thermal Management The gas turbine is the workhorse of power generation, and technology advances ...

  13. Laboratory Studies of the Effects of Pressure and Dissolved Gas Supersaturation on Turbine-Passed Fish

    SciTech Connect (OSTI)

    Neitzel, Duane A.

    2009-09-14

    Migratory and resident fish in the Columbia River Basin are exposed to stresses associated with hydroelectric power production, including changes in pressure as they pass through turbines and dissolved gas supersaturation (resulting from the release of water from the spillway). To examine pressure changes as a source of turbine-passage injury and mortality, Pacific Northwest National Laboratory scientists conducted specific tests using a hyperbaric chamber. Tests were designed to simulate Kaplan turbine passage conditions and to quantify the response of fish to rapid pressure changes, with and without the complication of fish being acclimated to gas-supersaturated water.

  14. Fish Passage Assessment of an Advanced Hydropower Turbine and Conventional Turbine Using Blade-strike Modeling

    SciTech Connect (OSTI)

    Deng, Zhiqun; Carlson, Thomas J.; Dauble, Dennis D.; Ploskey, Gene R.

    2011-01-04

    In the Columbia and Snake River basins, several species of Pacific salmon were listed under the Endangered Species Act of 1973 due to significant declines of fish population. Dam operators and design engineers are thus faced with the task of making those hydroelectric facilities more ecologically friendly through changes in hydro-turbine design and operation. Public Utility District No. 2 of Grant County, Washington, applied for re-licensing from the U.S. Federal Energy Regulatory Commission to replace the 10 turbines at Wanapum Dam with advanced hydropower turbines that were designed to increase power generation and improve fish passage conditions. We applied both deterministic and stochastic blade-strike models to the newly installed turbine and an existing turbine. Modeled probabilities were compared to the results of a large-scale live fish survival study and a sensor fish study under the same operational parameters. Overall, injury rates predicted by the deterministic model were higher than experimental rates of injury while those predicted by the stochastic model were in close agreement with experiment results. Fish orientation at the time of entry into the plane of the leading edges of the turbine runner blades was an important factor contributing to uncertainty in modeled results. The advanced design turbine had slightly higher modeled injury rates than the existing turbine design; however, there was no statistical evidence that suggested significant differences in blade-strike injuries between the two turbines and the hypothesis that direct fish survival rate through the advanced hydropower turbine is equal or better than that through the conventional turbine could not be rejected.

  15. Development of environmentally advanced hydropower turbine system design concepts

    SciTech Connect (OSTI)

    Franke, G.F.; Webb, D.R.; Fisher, R.K. Jr.

    1997-08-01

    A team worked together on the development of environmentally advanced hydro turbine design concepts to reduce hydropower`s impact on the environment, and to improve the understanding of the technical and environmental issues involved, in particular, with fish survival as a result of their passage through hydro power sites. This approach brought together a turbine design and manufacturing company, biologists, a utility, a consulting engineering firm and a university research facility, in order to benefit from the synergy of diverse disciplines. Through a combination of advanced technology and engineering analyses, innovative design concepts adaptable to both new and existing hydro facilities were developed and are presented. The project was divided into 4 tasks. Task 1 investigated a broad range of environmental issues and how the issues differed throughout the country. Task 2 addressed fish physiology and turbine physics. Task 3 investigated individual design elements needed for the refinement of the three concept families defined in Task 1. Advanced numerical tools for flow simulation in turbines are used to quantify characteristics of flow and pressure fields within turbine water passageways. The issues associated with dissolved oxygen enhancement using turbine aeration are presented. The state of the art and recent advancements of this technology are reviewed. Key elements for applying turbine aeration to improve aquatic habitat are discussed and a review of the procedures for testing of aerating turbines is presented. In Task 4, the results of the Tasks were assembled into three families of design concepts to address the most significant issues defined in Task 1. The results of the work conclude that significant improvements in fish passage survival are achievable.

  16. Optimizing Dam Operations for Power and for Fish: an Overview of the US Department of Energy and US Army Corps of Engineers ADvanced Turbine Development R&D. A Pre-Conference Workshop at HydroVision 2006, Oregon Convention Center, Portland, Oregon July 31, 2006

    SciTech Connect (OSTI)

    Dauble, Dennis D.

    2006-08-01

    This booklet contains abstracts of presentations made at a preconference workshop on the US Department of Energy and US Army Corps of Engineers hydroturbine programs. The workshop was held in conjunction with Hydrovision 2006 July 31, 2006 at the Oregon Convention Center in Portland Oregon. The workshop was organized by the Corps of Engineers, PNNL, and the DOE Wind and Hydropower Program. Presenters gave overviews of the Corps' Turbine Survival Program and the history of the DOE Advanced Turbine Development Program. They also spoke on physical hydraulic models, biocriteria for safe fish passage, pressure investigations using the Sensor Fish Device, blade strike models, optimization of power plant operations, bioindex testing of turbine performance, approaches to measuring fish survival, a systems view of turbine performance, and the Turbine Survival Program design approach.

  17. Simulating Turbine-Turbine Interaction

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Simulating Turbine-Turbine Interaction - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  18. I. V. Khalzov, B. P. Brown, E. J. Kaplan, N. Katz, C. Paz-Soldan et al.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Resistive and ferritic-wall plasma dynamos in a sphere I. V. Khalzov, B. P. Brown, E. J. Kaplan, N. Katz, C. Paz-Soldan et al. Citation: Phys. Plasmas 19, 104501 (2012); doi: 10.1063/1.4757219 View online: http://dx.doi.org/10.1063/1.4757219 View Table of Contents: http://pop.aip.org/resource/1/PHPAEN/v19/i10 Published by the American Institute of Physics. Additional information on Phys. Plasmas Journal Homepage: http://pop.aip.org/ Journal Information: http://pop.aip.org/about/about_the_journal

  19. Wind turbine

    DOE Patents [OSTI]

    Cheney, Jr., Marvin C.

    1982-01-01

    A wind turbine of the type having an airfoil blade (15) mounted on a flexible beam (20) and a pitch governor (55) which selectively, torsionally twists the flexible beam in response to wind turbine speed thereby setting blade pitch, is provided with a limiter (85) which restricts unwanted pitch change at operating speeds due to torsional creep of the flexible beam. The limiter allows twisting of the beam by the governor under excessive wind velocity conditions to orient the blades in stall pitch positions, thereby preventing overspeed operation of the turbine. In the preferred embodiment, the pitch governor comprises a pendulum (65,70) which responds to changing rotor speed by pivotal movement, the limiter comprising a resilient member (90) which engages an end of the pendulum to restrict further movement thereof, and in turn restrict beam creep and unwanted blade pitch misadjustment.

  20. Model Development and Loads Analysis of an Offshore Wind Turbine on a Tension Leg Platform with a Comparison to Other Floating Turbine Concepts: April 2009

    SciTech Connect (OSTI)

    Matha, D.

    2010-02-01

    This report presents results of the analysis of a 5-MW wind turbine located on a floating offshore tension leg platform (TLP) that was conducted using the fully coupled time-domain aero-hydro-servo-elastic design code FAST with AeroDyn and HydroDyn. The report also provides a description of the development process of the TLP model. The model has been verified via comparisons to frequency-domain calculations. Important differences have been identified between the frequency-domain and time-domain simulations, and have generated implications for the conceptual design process. An extensive loads and stability analysis for ultimate and fatigue loads according to the procedure of the IEC 61400-3 offshore wind turbine design standard was performed with the verified TLP model. This report compares the loads for the wind turbine on the TLP to those of an equivalent land-based turbine. Major instabilities for the TLP are identified and described.

  1. Laboratory Demonstration of a New American Low-Head Hydropower Turbine |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Laboratory Demonstration of a New American Low-Head Hydropower Turbine Laboratory Demonstration of a New American Low-Head Hydropower Turbine Laboratory Demonstration of a New American Low-Head Hydropower Turbine 68b_hydrogreen_small_hydro_ch_11.ppt (278 KB) More Documents & Publications Real World Demonstration of a New American Low-Head Hydropower Unit Turbine Aeration Physical Modeling and Software Design Scalable Low-head Axial-type Venturi-flow Energy Scave

  2. Aero Turbine | Open Energy Information

    Open Energy Info (EERE)

    Aero Turbine Jump to: navigation, search Name Aero Turbine Facility Aero Turbine Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner AeroTurbine...

  3. Himalaya Hydro Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    project developer expanding into biomass and wind and planning to raise a fund to invest in a pipeline of identified projects. References: Himalaya Hydro Pvt Ltd1 This...

  4. Hydro Alternative Energy | Open Energy Information

    Open Energy Info (EERE)

    Alternative Energy Jump to: navigation, search Name: Hydro Alternative Energy Place: Boca Raton, Florida Zip: 33486 Sector: Ocean Product: Marine project developer focusing on...

  5. HydroVolts | Open Energy Information

    Open Energy Info (EERE)

    Hydro Product: Aims to develop renewable energy from canals, waterways, streams, and ocean currents Website: www.hydrovolts.com Coordinates: 47.645778, -122.3257532 Show...

  6. First Hydro Company | Open Energy Information

    Open Energy Info (EERE)

    Company Jump to: navigation, search Name: First Hydro Company Place: Flintshire, England, United Kingdom Zip: CH5 3XJ Sector: Renewable Energy Product: Flintshire-based renewable...

  7. Vortex Hydro Energy LLC | Open Energy Information

    Open Energy Info (EERE)

    Energy LLC Jump to: navigation, search Name: Vortex Hydro Energy LLC Address: 4870 West Clark Rd Suite 108 Place: Ypsilanti Zip: 48197 Region: United States Sector: Marine and...

  8. Ambient Hydro Ltd | Open Energy Information

    Open Energy Info (EERE)

    Hydro Ltd develops small Hydroelectric projects. It also offers a range of technical and financial consultancy services. Coordinates: 51.431505, -2.187229 Show Map Loading...

  9. EA-2017: Braddock Locks and Dam Hydro Electric Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to Hydro Green Energy, LLC to fabricate, install, and operate one interchangeable Modular Bulb Turbine (MBT) which would be inserted in a Large Frame Module (LFM) at the existing Braddock Locks and Dam. The installation would be part of a larger project that would include the design and installation of seven MBTs to create a 5.2 megawatt, low head hydropower system at Braddock Locks and Dam. An Environmental Assessment (EA) previously prepared by the Federal Energy Regulatory Commission (FERC) has been adopted by DOE pursuant to the requirements of the National Environmental Policy Act (NEPA).

  10. Ledong Xinyuan Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Ledong Xinyuan Hydro Power Co Ltd Jump to: navigation, search Name: Ledong Xinyuan Hydro Power Co. Ltd Place: Hainan Province, China Zip: 572500 Sector: Hydro Product: China-based...

  11. Hul Hydro Power Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Hul Hydro Power Pvt Ltd Jump to: navigation, search Name: Hul Hydro Power Pvt. Ltd. Place: Hyderabad, Andhra Pradesh, India Zip: 500004 Sector: Hydro Product: Hyderabad-based small...

  12. Huichang Bai exia Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Huichang Bai exia Hydro Power Co Ltd Jump to: navigation, search Name: Huichang Bai'exia Hydro Power Co., Ltd Place: Jiangxi Province, China Zip: 342600 Sector: Hydro Product:...

  13. Puer Xianmei Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Puer Xianmei Hydro Power Co Ltd Jump to: navigation, search Name: Puer Xianmei Hydro Power Co., Ltd. Place: Yunnan Province, China Zip: 665108 Sector: Hydro Product: Yunnan-based...

  14. Siri Ram Syal Hydro Power Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Siri Ram Syal Hydro Power Pvt Ltd Jump to: navigation, search Name: Siri Ram Syal Hydro Power Pvt Ltd Place: New Delhi, Delhi (NCT), India Zip: 110070 Sector: Hydro Product:...

  15. Cosmos Hydro Power Ltd CHPL | Open Energy Information

    Open Energy Info (EERE)

    Ltd CHPL Jump to: navigation, search Name: Cosmos Hydro Power Ltd. (CHPL) Place: New Delhi, Delhi (NCT), India Zip: 110060 Sector: Hydro Product: Delhi-based small hydro project...

  16. Birahi Ganga Hydro Power Ltd | Open Energy Information

    Open Energy Info (EERE)

    Birahi Ganga Hydro Power Ltd Jump to: navigation, search Name: Birahi Ganga Hydro Power Ltd. Place: New Delhi, Delhi (NCT), India Zip: 110019 Sector: Hydro Product: Delhi-based...

  17. Chamoli Hydro Power P Ltd | Open Energy Information

    Open Energy Info (EERE)

    Chamoli Hydro Power P Ltd Jump to: navigation, search Name: Chamoli Hydro Power (P) Ltd. Place: Hyderabad, Andhra Pradesh, India Zip: 500 033 Sector: Hydro Product: Hyderabad-based...

  18. Super Hydro Electric Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Electric Pvt Ltd Jump to: navigation, search Name: Super Hydro Electric Pvt. Ltd. Place: New Delhi, Delhi (NCT), India Zip: 1100024 Sector: Hydro Product: Delhi-based small hydro...

  19. SBA Hydro Systems Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    SBA Hydro Systems Pvt Ltd Jump to: navigation, search Name: SBA Hydro Systems Pvt. Ltd. Place: New Delhi, Delhi (NCT), India Zip: 110019 Sector: Hydro Product: Delhi-based...

  20. Usaka Hydro Powers Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Usaka Hydro Powers Pvt Ltd Jump to: navigation, search Name: Usaka Hydro Powers Pvt. Ltd. Place: Anand Parvat, Delhi (NCT), India Zip: 110005 Sector: Hydro Product: Delhi-based...

  1. MHK Technologies/HydroGen 10 | Open Energy Information

    Open Energy Info (EERE)

    HydroGen 10 < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage HydroGen 10.jpg Technology Profile Primary Organization HydroGen Aquaphile sarl...

  2. Demonstration of variable speed permanent magnet generator at small, low-head hydro site

    SciTech Connect (OSTI)

    Brown Kinloch, David

    2015-12-18

    Small hydro developers face a limited set of bad choices when choosing a generator for a small low-head hydro site. Direct drive synchronous generators are expensive and technically complex to install. Simpler induction generators are higher speed, requiring a speed increaser, which results in inefficiencies and maintenance problems. In addition, both induction and synchronous generators turn at a fixed speed, causing the turbine to run off its peak efficiency curve whenever the available head is different than the designed optimum head.The solution to these problems is the variable speed Permanent Magnet Generators (PMG). At the Weisenberger Mill in Midway, KY, a variable speed Permanent Magnet Generator has been installed and demonstrated. This new PMG system replaced an existing induction generator that had a HTD belt drive speed increaser system. Data was taken from the old generator before it was removed and compared to data collected after the PMG system was installed. The new variable speed PMG system is calculated to produce over 96% more energy than the old induction generator system during an average year. This significant increase was primarily due to the PMG generator operating at the correct speed at the maximum head, and the ability for the PMG generator to reduce its speed to lower optimum speeds as the stream flow increased and the net head decreased.This demonstration showed the importance of being able to adjust the speed of fixed blade turbines. All fixed blade turbines with varying net heads could achieve higher efficiencies if the speed can be matched to the optimum speed as the head changes. In addition, this demonstration showed that there are many potential efficiencies that could be realized with variable speed technology at hydro sites where mismatched turbine and generator speeds result in lower power output, even at maximum head. Funding for this project came from the US Dept. of Energy, through Award Number DE-EE0005429.

  3. tidal turbines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tidal turbines - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  4. wind turbines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    turbines - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy

  5. Kingston Creek Hydro Project Powers 100 Households | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kingston Creek Hydro Project Powers 100 Households Kingston Creek Hydro Project Powers 100 Households August 21, 2013 - 12:00am Addthis Nevada-based contracting firm Nevada ...

  6. Vortex Hydro Energy Develops Transformational Technology to Harness...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vortex Hydro Energy Develops Transformational Technology to Harness Energy from Water Currents Vortex Hydro Energy Develops Transformational Technology to Harness Energy from Water ...

  7. Zhushan County Yuyuan Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Zhushan County Yuyuan Hydro Power Development Co Ltd Jump to: navigation, search Name: Zhushan County Yuyuan Hydro Power Development Co. Ltd Place: Zhushan county, Hubei Province,...

  8. Tehri Hydro Development Corporation Limited | Open Energy Information

    Open Energy Info (EERE)

    Solar, Wind energy Product: Focused on hydro projects; diversifying into solar and wind power. References: Tehri Hydro Development Corporation Limited1 This article is a stub....

  9. Langao County Guangming Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    County Guangming Hydro Power Development Co Ltd Jump to: navigation, search Name: Langao County Guangming Hydro Power Development Co., Ltd. Place: Ankang, Shaanxi Province, China...

  10. Jinxiu Yao Autonomous County Jinsheng Hydro Power Co Ltd | Open...

    Open Energy Info (EERE)

    Jinxiu Yao Autonomous County Jinsheng Hydro Power Co Ltd Jump to: navigation, search Name: Jinxiu Yao Autonomous County Jinsheng Hydro Power Co., Ltd. Place: Laibin, Guangxi...

  11. Guizhou Zhenning Yuefeng Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    Zhenning Yuefeng Hydro Power Development Co Ltd Jump to: navigation, search Name: Guizhou Zhenning Yuefeng Hydro Power Development Co.Ltd. Place: Anshun, Guizhou Province, China...

  12. Diebu Lazikou Hydro Power Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Lazikou Hydro Power Development Co Ltd Jump to: navigation, search Name: Diebu Lazikou Hydro Power Development Co., Ltd Place: Gannan Tibetan Autonomous Prefecture, Gansu Province,...

  13. Chishui Zhongshui Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Chishui Zhongshui Hydro Power Development Co Ltd Jump to: navigation, search Name: Chishui Zhongshui Hydro Power Development Co.Ltd. Place: Zunyi City, Guizhou Province, China Zip:...

  14. Department of Hydro Power Development | Open Energy Information

    Open Energy Info (EERE)

    Development Jump to: navigation, search Name: Department of Hydro Power Development Place: Itanagar, Arunachal Pradesh, India Zip: 791 110 Sector: Hydro Product: Itanagar-based...

  15. Jichuan Taiyang River Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Jichuan Taiyang River Hydro Power Development Co Ltd Jump to: navigation, search Name: Jichuan Taiyang River Hydro Power Development Co., Ltd. Place: Sichuan Province, China Zip:...

  16. Neijiang Tiangongtang Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Neijiang Tiangongtang Hydro Power Development Co Ltd Jump to: navigation, search Name: Neijiang Tiangongtang Hydro Power Development Co., Ltd Place: Neijiang, Sichuan Province,...

  17. Lushui County Quanyi Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Quanyi Hydro Power Development Co Ltd Jump to: navigation, search Name: Lushui County Quanyi Hydro Power Development Co., Ltd Place: Yunnan Province, China Zip: 673100 Sector:...

  18. Longyuan Hydro Power Development in Congjiang County Co Ltd ...

    Open Energy Info (EERE)

    Hydro Power Development in Congjiang County Co Ltd Jump to: navigation, search Name: Longyuan Hydro Power Development in Congjiang County Co.Ltd. Place: Guizhou Province, China...

  19. Guangdong Huaiji Xinlian Hydro electric Power Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Huaiji Xinlian Hydro electric Power Co Ltd Jump to: navigation, search Name: Guangdong Huaiji Xinlian Hydro-electric Power Co., Ltd. Place: Guangdong Province, China Zip: 526400...

  20. Yunnan Daoyao County Duodi River Hydro Power Development Co Ltd...

    Open Energy Info (EERE)

    Daoyao County Duodi River Hydro Power Development Co Ltd Jump to: navigation, search Name: Yunnan Daoyao County Duodi River Hydro Power Development Co., Ltd. Place: Yunnan...

  1. Guizhou Qiannan Zhongshui Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    Qiannan Zhongshui Hydro Power Development Co Ltd Jump to: navigation, search Name: Guizhou Qiannan Zhongshui Hydro Power Development Co.Ltd. Place: Duyun City, Guizhou Province,...

  2. Zhaidong Hydro Power Plant in Benxi County | Open Energy Information

    Open Energy Info (EERE)

    Zhaidong Hydro Power Plant in Benxi County Jump to: navigation, search Name: Zhaidong Hydro Power Plant in Benxi County Place: Benxi City, Liaoning Province, China Zip: 117100...

  3. Tongdao Yaolaitan Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Tongdao Yaolaitan Hydro Power Development Co Ltd Jump to: navigation, search Name: Tongdao Yaolaitan Hydro Power Development Co. Ltd Place: Huaihua, Hunan Province, China Zip:...

  4. Wanyuan Baiyangxi Hydro electric Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    Wanyuan Baiyangxi Hydro electric Power Development Co Ltd Jump to: navigation, search Name: Wanyuan Baiyangxi Hydro-electric Power Development Co., Ltd Place: Wanyuan, Sichuan...

  5. Jianyuan Hydro Power Development in Jianhe County Co Ltd | Open...

    Open Energy Info (EERE)

    Jianyuan Hydro Power Development in Jianhe County Co Ltd Jump to: navigation, search Name: Jianyuan Hydro Power Development in Jianhe County Co Ltd Place: Kaili, China Zip: 556000...

  6. Orissa Hydro Power Corporation Ltd | Open Energy Information

    Open Energy Info (EERE)

    Orissa Hydro Power Corporation Ltd Jump to: navigation, search Name: Orissa Hydro Power Corporation Ltd. Place: Bhubaneswar, Orissa, India Zip: 751002 Product: Bhubaneswar-based...

  7. Gansu Diantou Tao River Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    River Hydro Power Development Co Ltd Jump to: navigation, search Name: Gansu Diantou Tao River Hydro Power Development Co. Ltd. Place: Lanzhou, Gansu Province, China Zip: 730030...

  8. Qingyuan County Xiankeng Hydro Power Development Co Ltd | Open...

    Open Energy Info (EERE)

    Xiankeng Hydro Power Development Co Ltd Jump to: navigation, search Name: Qingyuan County Xiankeng Hydro Power Development Co. Ltd. Place: Lishui City, China Zip: 323800 Sector:...

  9. Ningyuan County Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Development Co Ltd Jump to: navigation, search Name: Ningyuan County Hydro Power Development Co., Ltd. Place: Yongzhou, Hunan Province, China Zip: 425600 Sector: Hydro Product:...

  10. Chongqing City Chengkou County Mingda Hydro Power Development...

    Open Energy Info (EERE)

    Chengkou County Mingda Hydro Power Development Co Ltd Jump to: navigation, search Name: Chongqing City Chengkou County Mingda Hydro Power Development Co., Ltd Place: Chongqing,...

  11. Wind & Hydro Energy Feasiblity Study for the Yurok Tribe

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    showed that wind, hydro, biomass and solar energy resources are available on the Reservation. * Solar is appropriate only at the facility household scale. * Wind, hydro and ...

  12. Statoil formerly StatoilHydro | Open Energy Information

    Open Energy Info (EERE)

    Stavanger, Norway Zip: N-4035 Sector: Hydro, Renewable Energy Product: Norway-based oil and gas company. StatoilHydro(tm)s New Energy business unit involves renewable...

  13. Dhauladhar Hydro System Pvt Ltd | Open Energy Information

    Open Energy Info (EERE)

    Sector: Hydro Product: Himachal-based developer of small hydro projects. Coordinates: 23.25149, 87.522408 Show Map Loading map... "minzoom":false,"mappingservice":"googlema...

  14. Luding County Tianding Hydro Electricity Development Co Ltd ...

    Open Energy Info (EERE)

    Luding County Tianding Hydro Electricity Development Co Ltd Jump to: navigation, search Name: Luding County Tianding Hydro Electricity Development Co. Ltd Place: Ganzi zhou,...

  15. Zhaojue County Zhuhe Hydro Electricity Development Co Ltd | Open...

    Open Energy Info (EERE)

    Zhaojue County Zhuhe Hydro Electricity Development Co Ltd Jump to: navigation, search Name: Zhaojue County Zhuhe Hydro Electricity Development Co. Ltd. Place: China Zip: 627850...

  16. Longsheng Gezu Autonomous County Xinglong Hydro electricity Co...

    Open Energy Info (EERE)

    Xinglong Hydro electricity Co Ltd Jump to: navigation, search Name: Longsheng Gezu Autonomous County Xinglong Hydro-electricity Co., Ltd. Place: Guilin, Guangxi Autonomous Region,...

  17. Renewable Energy Resources Inc formerly Internal Hydro International...

    Open Energy Info (EERE)

    Inc formerly Internal Hydro International Inc Jump to: navigation, search Name: Renewable Energy Resources Inc (formerly Internal Hydro International Inc) Place: Tampa, Florida...

  18. Jiangxi Province Ruijin City Liujinba Hydro Development Co Ltd...

    Open Energy Info (EERE)

    Ruijin City Liujinba Hydro Development Co Ltd Jump to: navigation, search Name: Jiangxi Province Ruijin City Liujinba Hydro Development Co,. Ltd. Place: Ruijin city, Jiangxi...

  19. Zhongda Sanchuan Hydro Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Zhongda Sanchuan Hydro Development Co Ltd Jump to: navigation, search Name: Zhongda Sanchuan Hydro Development Co Ltd Place: Hangzhou, Zhejiang Province, China Zip: 310052 Sector:...

  20. Quzhou Tadi Hydro Complex Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Quzhou Tadi Hydro Complex Development Co Ltd Jump to: navigation, search Name: Quzhou Tadi Hydro Complex Development Co., Ltd. Place: Quzhou, Zhejiang Province, China Zip: 324022...

  1. Xuan en Zhongneng Hydro electric Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Xuan en Zhongneng Hydro electric Development Co Ltd Jump to: navigation, search Name: Xuan'en Zhongneng Hydro-electric Development Co., Ltd. Place: Enshi, Hubei Province, China...

  2. Sichuan Tianquan Qieshan Hydro Generation Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Qieshan Hydro Generation Co Ltd Jump to: navigation, search Name: Sichuan Tianquan Qieshan Hydro Generation Co.,Ltd. Place: Ya(tm)an, Sichuan Province, China Zip: 625500...

  3. Pengshui Haitian Hydro electric Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Haitian Hydro electric Development Co Ltd Jump to: navigation, search Name: Pengshui Haitian Hydro-electric Development Co., Ltd. Place: Pengshui County, Chongqing Municipality,...

  4. Yunnan Hualian Maguan Hydro Electric Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Hualian Maguan Hydro Electric Co Ltd Jump to: navigation, search Name: Yunnan Hualian Maguan Hydro-Electric Co., Ltd. Place: Maguan County, Yunnan Province, China Zip: 663700...

  5. Laifeng Najitan Hydro electric Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Laifeng Najitan Hydro electric Development Co Ltd Jump to: navigation, search Name: Laifeng Najitan Hydro-electric Development Co., Ltd. Place: Hubei Province, China Zip: 445703...

  6. Hubei Yichang Tianyuan Hydro electric Development Co Ltd | Open...

    Open Energy Info (EERE)

    Tianyuan Hydro electric Development Co Ltd Jump to: navigation, search Name: Hubei Yichang Tianyuan Hydro-electric Development Co., Ltd. Place: Yichang, Hubei Province, China Zip:...

  7. Zhejiang Longyou Xiaoxitan Hydro Complex Development Co Ltd ...

    Open Energy Info (EERE)

    Longyou Xiaoxitan Hydro Complex Development Co Ltd Jump to: navigation, search Name: Zhejiang Longyou Xiaoxitan Hydro Complex Development Co., Ltd Place: Quzhou, Zhejiang Province,...

  8. Lichuan City Yujiang River Valley Hydro Co Ltd | Open Energy...

    Open Energy Info (EERE)

    Lichuan City Yujiang River Valley Hydro Co Ltd Jump to: navigation, search Name: Lichuan City Yujiang River Valley Hydro Co., Ltd. Place: Hubei Province, China Zip: 445400 Sector:...

  9. EERE Success Story-Vortex Hydro Energy Develops Transformational...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vortex Hydro Energy Develops Transformational Technology to Harness Energy from Water Currents EERE Success Story-Vortex Hydro Energy Develops Transformational Technology to ...

  10. Gansu Zhongyuan Water Conservancy and Hydro Power Plant Development...

    Open Energy Info (EERE)

    Water Conservancy and Hydro Power Plant Development Co Ltd Jump to: navigation, search Name: Gansu Zhongyuan Water Conservancy and Hydro Power Plant Development Co. Ltd. Place:...

  11. Sichuan Minjiang Electrolyte Management Hydro Power Co Ltd |...

    Open Energy Info (EERE)

    Electrolyte Management Hydro Power Co Ltd Jump to: navigation, search Name: Sichuan Minjiang Electrolyte Management Hydro Power Co., Ltd. Place: Mianyang, Sichuan Province, China...

  12. Lingshui Ruida Hydro Power Investment Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Lingshui Ruida Hydro Power Investment Co Ltd Jump to: navigation, search Name: Lingshui Ruida Hydro Power Investment Co. Ltd. Place: Hainan Province, China Zip: 527400 Sector:...

  13. Sichuan Provincial Hydro Power Investment Operation Group Co...

    Open Energy Info (EERE)

    Hydro Power Investment Operation Group Co ltd Jump to: navigation, search Name: Sichuan Provincial Hydro Power Investment & Operation (Group) Co. ltd Place: Chengdu City, Sichuan...

  14. Guizhou Yuefeng Hydro Power Investment Co Ltd | Open Energy Informatio...

    Open Energy Info (EERE)

    Yuefeng Hydro Power Investment Co Ltd Jump to: navigation, search Name: Guizhou Yuefeng Hydro Power Investment Co Ltd Place: Guiyang City, Guizhou Province, China Zip: 550018...

  15. HydroGen Corporation formerly Chiste Corp | Open Energy Information

    Open Energy Info (EERE)

    HydroGen Corporation formerly Chiste Corp Jump to: navigation, search Name: HydroGen Corporation (formerly Chiste Corp) Place: Jefferson Hills, Pennsylvania Zip: 15025 Sector:...

  16. Pacific Hydro Brazil formerly SES Solu es de Energias Sustent...

    Open Energy Info (EERE)

    Hydro Brazil formerly SES Solu es de Energias Sustent veis Jump to: navigation, search Name: Pacific Hydro Brazil (formerly SES - Solues de Energias Sustentveis) Place:...

  17. PP-369 British Columbia Hydro and Power Authority | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-369 British Columbia Hydro and Power Authority PP-369 British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia and Power Authority to...

  18. Yang County Kafang Hydro Power Development Co Ltd | Open Energy...

    Open Energy Info (EERE)

    County Kafang Hydro Power Development Co Ltd Jump to: navigation, search Name: Yang County Kafang Hydro Power Development Co. Ltd. Place: Hanzhong, Shaanxi Province, China Zip:...

  19. Single Rotor Turbine

    DOE Patents [OSTI]

    Platts, David A.

    2004-10-26

    A rotor for use in turbine applications has a centrifugal compressor having axially disposed spaced apart fins forming passages and an axial turbine having hollow turbine blades interleaved with the fins and through which fluid from the centrifugal compressor flows.

  20. Energy 101: Wind Turbines

    ScienceCinema (OSTI)

    None

    2013-05-29

    See how wind turbines generate clean electricity from the power of the wind. Highlighted are the various parts and mechanisms of a modern wind turbine.

  1. Experimental study of characteristic curves of centrifugal pumps working as turbines in different specific speeds

    SciTech Connect (OSTI)

    Derakhshan, Shahram; Nourbakhsh, Ahmad

    2008-01-15

    Pump manufacturers do not normally provide the characteristic curves of their pumps working as turbines. Therefore, establishing a correlation between the performances of direct (pump) and reverse (turbine) modes is essential in selecting the proper machine. In this paper, several centrifugal pumps (N{sub s} < 60 (m, m{sup 3}/s)) were tested as turbines. Using experimental data, some relations were derived to predict the best efficiency point of a pump working as a turbine, based on pump hydraulic characteristics. Validity of the presented method was shown using some referenced experimental data. Two equations were presented to estimate the complete characteristic curves of centrifugal pumps as turbines based on their best efficiency point. Deviations of suggested method from experimental data were considered and discussed. Finally, a procedure was presented for selecting a suitable pump to work as a turbine in a small hydro-site. (author)

  2. Fish-Friendly Hydropower Turbine Development & Deployment: Alden Turbine Preliminary Engineering and Model Testing

    SciTech Connect (OSTI)

    2011-10-01

    The Alden turbine was developed through the U.S. Department of Energy's (DOE's) former Advanced Hydro Turbine Systems Program (1994-2006) and, more recently, through the Electric Power Research Institute (EPRI) and the DOE's Wind & Water Power Program. The primary goal of the engineering study described here was to provide a commercially competitive turbine design that would yield fish passage survival rates comparable to or better than the survival rates of bypassing or spilling flow. Although the turbine design was performed for site conditions corresponding to 92 ft (28 m) net head and a discharge of 1500 cfs (42.5 cms), the design can be modified for additional sites with differing operating conditions. During the turbine development, design modifications were identified for the spiral case, distributor (stay vanes and wicket gates), runner, and draft tube to improve turbine performance while maintaining features for high fish passage survival. Computational results for pressure change rates and shear within the runner passage were similar in the original and final turbine geometries, while predicted minimum pressures were higher for the final turbine. The final turbine geometry and resulting flow environments are expected to further enhance the fish passage characteristics of the turbine. Computational results for the final design were shown to improve turbine efficiencies by over 6% at the selected operating condition when compared to the original concept. Prior to the release of the hydraulic components for model fabrication, finite element analysis calculations were conducted for the stay vanes, wicket gates, and runner to verify that structural design criteria for stress and deflections were met. A physical model of the turbine was manufactured and tested with data collected for power and efficiency, cavitation limits, runaway speed, axial and radial thrust, pressure pulsations, and wicket gate torque. All parameters were observed to fall within ranges

  3. Turbine Thermal Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Turbine Thermal Management Fact Sheets Research Team Members Key Contacts Turbine Thermal Management The gas turbine is the workhorse of power generation, and technology advances to current land-based turbines are directly linked to our country's economic and energy security. Technical advancement for any type of gas turbine generally implies better performance, greater efficiency, and extended component life. From the standpoint of cycle efficiency and durability, this suggests that a continual

  4. turbine | OpenEI Community

    Open Energy Info (EERE)

    turbine Home Future of Condition Monitoring for Wind Turbines Description: Research into third party software to aid in the development of better CMS in order to raise turbine...

  5. Western Turbine | Open Energy Information

    Open Energy Info (EERE)

    Turbine Jump to: navigation, search Name: Western Turbine Place: Aurora, Colorado Zip: 80011 Sector: Wind energy Product: Wind Turbine Installation and Maintainance. Coordinates:...

  6. Chickamauga Hydro Unit 3: History of problems, application of new technology and corrective actions

    SciTech Connect (OSTI)

    Miller, L.J. III; Thompson, D.W.

    1995-12-31

    Chickamauga Unit 3 was placed in commercial operation in 1940 and has been in operation for over fifty years. During the history of the dam, concrete growth has been the source of alignment problems with all of the turbines and generators. This problem has resulted in difficulty in the maintenance of the minimum clearance between the rotating and stationary components of the unit. Disassembly of the units has been necessary to restore these minimum clearances. Over the years several potentially damaging problems have plagued this unit. In November of 1992 a Rotor Mounted Scanner (RMS) manufactured by MCM Enterprise Limited of Bellevue, Washington was installed on this unit. The use of state of the art technology has provided information which allowed operators to prevent an in-service failure when the air gap became dangerously small. Adjustments were made in the operation of the unit to minimize the temperature cycles. This change allowed the continued operation of the unit for an additional seven months to a planned outage. The turbine was scheduled to be replaced due to worn bushings in the trunion of the Kaplan type turbine. The information from the RMS was also used to formulate corrective actions that were taken during the planned outage. The findings made during the outage and corrective actions for continued dependable service will be discussed.

  7. Combining Turbine Blade-Strike and Life Cycle Models to Assess Mitigation Strategies for Fish Passing Dams

    SciTech Connect (OSTI)

    Ferguson, John W.; Ploskey, Gene R.; Leonardsson, Kjell; Zabel, Richard W.; Lundqvist, Hans

    2008-08-01

    Combining the two models produced a rapid, cost effective tool for assessing dam passage impacts to fish populations and prioritizing among mitigation strategies for conserving fish stocks in regulated rivers. Estimated mortality of juvenile and adult Atlantic salmon (Salmo salar) and sea trout (S. trutta) passing turbines at two dams in northern Sweden was significantly higher for Kaplan turbines compared to Francis turbines, and for adult fish compared to juveniles based on blade strike models. Mean probability of mortality ranged from 6.7% for salmon smolts passing Francis turbines to >100% for adult salmon passing Kaplan turbines. Life cycle modeling allowed benefits to be assessed for three alternatives that mitigated this mortality. Salmon population responses varied considerably among alternatives and rivers: growth rates improved as much as 17.9%, female escapements increased up to 669%, and more than 1,300 additional female salmon were produced in one case. Protecting both smolts and adults provided benefits, and in one river, mitigating turbine mortality alone was estimated to have met the production capacity of the available habitat.

  8. Fujian Shun Chang Yangkou Hydro Power Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Chang Yangkou Hydro Power Co Ltd Jump to: navigation, search Name: Fujian Shun Chang Yangkou Hydro Power Co., Ltd. Place: Fujian Province, China Zip: 353200 Sector: Hydro Product:...

  9. Advanced Combustion Turbines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that will accelerate turbine performance and efficiency beyond current state-of-the-art and reduce the risk to market for novel and advanced turbine-based power cycles. ...

  10. Wind Turbines Benefit Crops

    ScienceCinema (OSTI)

    Takle, Gene

    2013-03-01

    Ames Laboratory associate scientist Gene Takle talks about research into the effect of wind turbines on nearby crops. Preliminary results show the turbines may have a positive effect by cooling and drying the crops and assisting with carbon dioxide uptake.

  11. Sliding vane geometry turbines

    SciTech Connect (OSTI)

    Sun, Harold Huimin; Zhang, Jizhong; Hu, Liangjun; Hanna, Dave R

    2014-12-30

    Various systems and methods are described for a variable geometry turbine. In one example, a turbine nozzle comprises a central axis and a nozzle vane. The nozzle vane includes a stationary vane and a sliding vane. The sliding vane is positioned to slide in a direction substantially tangent to an inner circumference of the turbine nozzle and in contact with the stationary vane.

  12. Snohomish PUD see OpenHydro | Open Energy Information

    Open Energy Info (EERE)

    PUD see OpenHydro Jump to: navigation, search Name: Snohomish PUD see OpenHydro Region: United States Sector: Marine and Hydrokinetic Website: http: This company is listed in the...

  13. NPS Fact Sheet: Hydro-Related Roles, Interests, Activities |...

    Open Energy Info (EERE)

    Fact Sheet: Hydro-Related Roles, Interests, Activities Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: NPS Fact Sheet: Hydro-Related Roles, Interests,...

  14. New England Hydro-Trans Corp | Open Energy Information

    Open Energy Info (EERE)

    Hydro-Trans Corp Jump to: navigation, search Name: New England Hydro-Trans Corp Place: New Hampshire Phone Number: 1.800.661.3805 Website: www.transcanada.comindex.html Twitter:...

  15. New England Hydro-Tran Elec Co | Open Energy Information

    Open Energy Info (EERE)

    New England Hydro-Tran Elec Co Jump to: navigation, search Name: New England Hydro-Tran Elec Co Place: Massachusetts Phone Number: 860 729 9767 Website: www.nehydropower.com...

  16. City of Hart Hydro, Michigan (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Hydro, Michigan (Utility Company) Jump to: navigation, search Name: City of Hart Hydro Place: Michigan Phone Number: (231)-873-5367 Website: www.ci.hart.mi.usservices.htm Outage...

  17. HydroGen Aquaphile sarl | Open Energy Information

    Open Energy Info (EERE)

    Aquaphile sarl Jump to: navigation, search Name: HydroGen Aquaphile sarl Region: France Sector: Marine and Hydrokinetic Website: www.hydro-gen.fr This company is listed in the...

  18. HydroNEXT Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HydroNEXT Fact Sheet HydroNEXT Fact Sheet Through its HydroNEXT initiative, the U.S. Department of Energy (DOE) invests in the development of innovative technologies that dramatically change the way we think about hydropower by lowering cost, improving performance, and promoting environmental stewardship of hydropower development. HydroNEXT is pursuing a comprehensive technology research, development, demonstration, and deployment strategy across three resource classes to increase the

  19. Hydrogen Turbines | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Turbines Hydrogen Turbines Hydrogen Turbines The Turbines of Tomorrow Combustion (gas) turbines are key components of advanced systems designed for new electric power plants in the United States. With gas turbines, power plants will supply clean, increasingly fuel-efficient, and relatively low-cost energy. Typically, a natural gas-fired combustion turbine-generator operating in a "simple cycle" converts between 25 and 35 percent of the natural gas heating value to useable

  20. Single casing reheat turbine

    SciTech Connect (OSTI)

    Matsushima, Tatsuro; Nishimura, Shigeo

    1999-07-01

    For conventional power plants, regenerative reheat steam turbines have been accepted as the most practical method to meet the demand for efficient and economical power generation. Recently the application of reheat steam turbines for combined cycle power plant began according to the development of large-capacity high temperature gas turbine. The two casing double flow turbine has been applied for this size of reheat steam turbine. The single casing reheat turbine can offer economical and compact power plant. Through development of HP-LP combined rotor and long LP blading series, Mitsubishi Heavy Industries, Ltd. had developed a single casing reheat steam turbine series and began to use it in actual plants. Six units are already in operation and another seven units are under manufacturing. Multiple benefits of single casing reheat turbine are smaller space requirements, shorter construction and erection period, equally good performance, easier operation and maintenance, shorter overhaul period, smaller initial investment, lower transportation expense and so on. Furthermore, single exhaust steam turbine makes possible to apply axial exhaust type, which will lower the height of T/G foundation and T/G housing. The single casing reheat turbine has not only compact and economical configuration itself but also it can reduce the cost of civil construction. In this paper, major developments and design features of the single casing reheat turbine are briefly discussed and operating experience, line-up and technical consideration for performance improvement are presented.

  1. LANL hydro test update(u)

    SciTech Connect (OSTI)

    Aragon, Ezekiel D

    2011-01-06

    Briefings presenting W78 programmatic activities for FY11 and the status and plan for associated Hydro 3617, is included wherewith in support of the NNSA W78 Program Review Meeting scheduled for January 11 thru 13, 2011, at the Savannah River Plant, SC.

  2. Coalescing Wind Turbine Wakes

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Lee, S.; Churchfield, M.; Sirnivas, S.; Moriarty, P.; Nielsen, F. G.; Skaare, B.; Byklum, E.

    2015-06-18

    A team of researchers from the National Renewable Energy Laboratory and Statoil used large-eddy simulations to numerically investigate the merging wakes from upstream offshore wind turbines. Merging wakes are typical phenomena in wind farm flows in which neighboring turbine wakes consolidate to form complex flow patterns that are as yet not well understood. In the present study, three 6-MW turbines in a row were subjected to a neutrally stable atmospheric boundary layer flow. As a result, the wake from the farthest upstream turbine conjoined the downstream wake, which significantly altered the subsequent velocity deficit structures, turbulence intensity, and the globalmore » meandering behavior. The complexity increased even more when the combined wakes from the two upstream turbines mixed with the wake generated by the last turbine, thereby forming a "triplet" structure. Although the influence of the wake generated by the first turbine decayed with downstream distance, the mutated wakes from the second turbine continued to influence the downstream wake. Two mirror-image angles of wind directions that yielded partial wakes impinging on the downstream turbines yielded asymmetric wake profiles that could be attributed to the changing flow directions in the rotor plane induced by the Coriolis force. In conclusion, the turbine wakes persisted for extended distances in the present study, which is a result of low aerodynamic surface roughness typically found in offshore conditions« less

  3. Coalescing Wind Turbine Wakes

    SciTech Connect (OSTI)

    Lee, S.; Churchfield, M.; Sirnivas, S.; Moriarty, P.; Nielsen, F. G.; Skaare, B.; Byklum, E.

    2015-06-18

    A team of researchers from the National Renewable Energy Laboratory and Statoil used large-eddy simulations to numerically investigate the merging wakes from upstream offshore wind turbines. Merging wakes are typical phenomena in wind farm flows in which neighboring turbine wakes consolidate to form complex flow patterns that are as yet not well understood. In the present study, three 6-MW turbines in a row were subjected to a neutrally stable atmospheric boundary layer flow. As a result, the wake from the farthest upstream turbine conjoined the downstream wake, which significantly altered the subsequent velocity deficit structures, turbulence intensity, and the global meandering behavior. The complexity increased even more when the combined wakes from the two upstream turbines mixed with the wake generated by the last turbine, thereby forming a "triplet" structure. Although the influence of the wake generated by the first turbine decayed with downstream distance, the mutated wakes from the second turbine continued to influence the downstream wake. Two mirror-image angles of wind directions that yielded partial wakes impinging on the downstream turbines yielded asymmetric wake profiles that could be attributed to the changing flow directions in the rotor plane induced by the Coriolis force. In conclusion, the turbine wakes persisted for extended distances in the present study, which is a result of low aerodynamic surface roughness typically found in offshore conditions

  4. Energy 101: Wind Turbines - 2014 Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Turbines - 2014 Update Energy 101: Wind Turbines - 2014 Update

  5. Environmental Effects of Hydrokinetic Turbines on Fish: Desktop and Laboratory Flume Studies

    SciTech Connect (OSTI)

    Jacobson, Paul T.; Amaral, Stephen V.; Castro-Santos, Theodore; Giza, Dan; Haro, Alexander J.; Hecker, George; McMahon, Brian; Perkins, Norman; Pioppi, Nick

    2012-12-31

    This collection of three reports describes desktop and laboratory flume studies that provide information to support assessment of the potential for injury and mortality of fish that encounter hydrokinetic turbines of various designs installed in tidal and river environments. Behavioral responses to turbine exposure also are investigated to support assessment of the potential for disruptions to upstream and downstream movements of fish. The studies: (1) conducted an assessment of potential injury mechanisms using available data from studies with conventional hydro turbines; (2) developed theoretical models for predicting blade strike probabilities and mortality rates; and (3) performed flume testing with three turbine designs and several fish species and size groups in two laboratory flumes to estimate survival rates and document fish behavior. The project yielded three reports which this document comprises. The three constituent documents are addressed individually below Fish Passage Through Turbines: Application of Conventional Hydropower Data to Hydrokinetic Technologies Fish passing through the blade sweep of a hydrokinetic turbine experience a much less harsh physical environment than do fish entrained through conventional hydro turbines. The design and operation of conventional turbines results in high flow velocities, abrupt changes in flow direction, relatively high runner rotational and blade speeds, rapid and significant changes in pressure, and the need for various structures throughout the turbine passageway that can be impacted by fish. These conditions generally do not occur or are not significant factors for hydrokinetic turbines. Furthermore, compared to conventional hydro turbines, hydrokinetic turbines typically produce relatively minor changes in shear, turbulence, and pressure levels from ambient conditions in the surrounding environment. Injuries and mortality from mechanical injuries will be less as well, mainly due to low rotational speeds and

  6. Testing America's Wind Turbines | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Testing America's Wind Turbines Testing America's Wind Turbines View All Maps Addthis

  7. Use of an Autonomous Sensor to Evaluate the Biological Performance of the Advanced Turbine at Wanapum Dam

    SciTech Connect (OSTI)

    Deng, Zhiqun; Carlson, Thomas J.; Duncan, Joanne P.; Richmond, Marshall C.; Dauble, Dennis D.

    2010-10-13

    Hydropower is the largest renewable energy resource in the world and the United States. However, Hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydro turbines. In the Columbia and Snake River basins, dam operators and engineers are required to make these hydroelectric facilities more fish-friendly through changes in hydro-turbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon in the Endangered Species Act of 1973. Grant County Public Utility District (Grant PUD) requested authorization from the Federal Energy Regulatory Commission to replace the 10 turbines at Wanapum Dam with advanced hydropower turbines that are designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. The U.S. Department of Energy Office of Energy Efficiency and Renewable Energy provided co-funding to Grant PUD for aspects of performance testing that supported the application. As an additional measure to the primary evaluation measure of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device to provide insight into the specific hydraulic conditions or physical stresses that the fish experienced or the specific causes of the biological response. We found that the new blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by balloon tag-recapture tests. In addition, the new turbine provided a better pressure and rate of change environment for fish passage. Overall, the Sensor Fish data indicated that the advanced hydro turbine design met the desired fish passage goals for Wanapum Dam.

  8. Direct drive wind turbine

    DOE Patents [OSTI]

    Bywaters, Garrett; Danforth, William; Bevington, Christopher; Jesse, Stowell; Costin, Daniel

    2006-10-10

    A wind turbine is provided that minimizes the size of the drive train and nacelle while maintaining the power electronics and transformer at the top of the tower. The turbine includes a direct drive generator having an integrated disk brake positioned radially inside the stator while minimizing the potential for contamination. The turbine further includes a means for mounting a transformer below the nacelle within the tower.

  9. Direct drive wind turbine

    DOE Patents [OSTI]

    Bywaters, Garrett; Danforth, William; Bevington, Christopher; Jesse, Stowell; Costin, Daniel

    2007-02-27

    A wind turbine is provided that minimizes the size of the drive train and nacelle while maintaining the power electronics and transformer at the top of the tower. The turbine includes a direct drive generator having an integrated disk brake positioned radially inside the stator while minimizing the potential for contamination. The turbine further includes a means for mounting a transformer below the nacelle within the tower.

  10. Direct drive wind turbine

    DOE Patents [OSTI]

    Bywaters, Garrett; Danforth, William; Bevington, Christopher; Stowell, Jesse; Costin, Daniel

    2006-07-11

    A wind turbine is provided that minimizes the size of the drive train and nacelle while maintaining the power electronics and transformer at the top of the tower. The turbine includes a direct drive generator having an integrated disk brake positioned radially inside the stator while minimizing the potential for contamination. The turbine further includes a means for mounting a transformer below the nacelle within the tower.