Sample records for k-25 gaseous diffusion

  1. K-25 Gaseous Diffusion Process Building | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    » Signature Facilities » K-25 Gaseous Diffusion Process Building K-25 Gaseous Diffusion Process Building K-25 Gaseous Diffusion Process Building New! K-25 Virtual Museum The K-25 plant, located on the southwestern end of the Oak Ridge reservation, used the gaseous diffusion method to separate uranium-235 from uranium-238. Based on the well-known principle that molecules of a lighter isotope would pass through a porous barrier more readily than molecules of a heavier one, gaseous diffusion

  2. K-25 Gaseous Diffusion Process Building | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    other two being electromagnetic separation and liquid thermal diffusion. The S-50 liquid thermal diffusion plant, using convection to separate the isotopes in thousands of tall...

  3. Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

    SciTech Connect (OSTI)

    Kopotic, James D.; Ferri, Mark S.; Buttram, Claude

    2013-07-01

    The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

  4. Energy Department Completes K-25 Gaseous Diffusion Building Demolition

    Broader source: Energy.gov [DOE]

    The five year demolition project was completed ahead of schedule and all debris shipments are expected to be completed in spring 2014.

  5. Portsmouth Gaseous Diffusion Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant | November 2009 Aerial View Portsmouth Gaseous Diffusion Plant | November 2009 Aerial View The current mission at the Portsmouth Gaseous Diffusion Plant is to effectively implement EM responsibilities, obligations and activities to accomplish environmental remediation actions in compliance with regulatory milestones and agreements; disposition legacy and newly generated waste; implement Cold

  6. School science project 'demystifies' Portsmouth Gaseous Diffusion...

    Energy Savers [EERE]

    School science project 'demystifies' Portsmouth Gaseous Diffusion Plant Site School science project 'demystifies' Portsmouth Gaseous Diffusion Plant Site June 2, 2015 - 10:40am ...

  7. Independent Activity Report, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Portsmouth Gaseous Diffusion Plant - August 2011 Independent Activity Report, Portsmouth Gaseous Diffusion Plant - August 2011 August 2011 Orientation Visit to the Portsmouth ...

  8. Manhattan Project: Working K-25 into the Mix, 1943-1944

    Office of Scientific and Technical Information (OSTI)

    K-25 Gaseous Diffusion Plant, Oak Ridge WORKING K-25 INTO THE MIX (Oak Ridge: Clinton, 1943-1944) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: ...

  9. DOE Releases Request for Information for Paducah Gaseous Diffusion...

    Energy Savers [EERE]

    Information for Paducah Gaseous Diffusion Plant Deactivation & Remediation Services DOE Releases Request for Information for Paducah Gaseous Diffusion Plant Deactivation & ...

  10. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    selected aspects of the work planning and control process being implemented by the Portsmouth Gaseous Diffusion Plant (PORTS) contractor, Fluor-Babcock & Wilcox Portsmouth (FBP). ...

  11. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events ...

  12. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Energy Savers [EERE]

    Point of contact for more information: Robert Smith, Department of Energy-Paducah Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities ...

  13. Gas phase decontamination of gaseous diffusion process equipment

    SciTech Connect (OSTI)

    Bundy, R.D.; Munday, E.B.; Simmons, D.W.; Neiswander, D.W.

    1994-03-01

    D&D of the process facilities at the gaseous diffusion plants (GDPs) will be an enormous task. The EBASCO estimate places the cost of D&D of the GDP at the K-25 Site at approximately $7.5 billion. Of this sum, nearly $4 billion is associated with the construction and operation of decontamination facilities and the dismantlement and transport of contaminated process equipment to these facilities. In situ long-term low-temperature (LTLT) gas phase decontamination is being developed and demonstrated at the K-25 site as a technology that has the potential to substantially lower these costs while reducing criticality and safeguards concerns and worker exposure to hazardous and radioactive materials. The objective of gas phase decontamination is to employ a gaseous reagent to fluorinate nonvolatile uranium deposits to form volatile LJF6, which can be recovered by chemical trapping or freezing. The LTLT process permits the decontamination of the inside of gas-tight GDP process equipment at room temperature by substituting a long exposure to subatmospheric C1F for higher reaction rates at higher temperatures. This paper outlines the concept for applying LTLT gas phase decontamination, reports encouraging laboratory experiments, and presents the status of the design of a prototype mobile system. Plans for demonstrating the LTLT process on full-size gaseous diffusion equipment are also outlined briefly.

  14. K-25 demolition project receives American Nuclear Society award |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy demolition project receives American Nuclear Society award K-25 demolition project receives American Nuclear Society award May 27, 2014 - 12:00pm Addthis The American Nuclear Society will recognize the K-25 demolition project at its summer meeting in June. The American Nuclear Society will recognize the K-25 demolition project at its summer meeting in June. Oak Ridge, Tenn. - The successful demolition of a former gaseous diffusion facility has been honored by the

  15. Paducah Gaseous Diffusion Plant - GW OU Northwest Plume | Department...

    Office of Environmental Management (EM)

    Gaseous Diffusion Plant - GW OU Northwest Plume Paducah Gaseous Diffusion Plant - GW OU Northwest Plume January 1, 2014 - 12:00pm Addthis US Department of Energy Groundwater ...

  16. DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion...

    Energy Savers [EERE]

    Paducah Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services October 6, 2014 - 4:13pm Addthis Media ...

  17. DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Seeks Small Businesses for Paducah Gaseous Diffusion Plant Infrastructure Support Services DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant Infrastructure Support Services ...

  18. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities ...

  19. DOE Seeks Small Businesses for Portsmouth Gaseous Diffusion Plant...

    Energy Savers [EERE]

    Portsmouth Gaseous Diffusion Plant Infrastructure Support Services DOE Seeks Small Businesses for Portsmouth Gaseous Diffusion Plant Infrastructure Support Services July 2, 2014 - ...

  20. Deactivation Project Begins at Paducah Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Begins at Paducah Gaseous Diffusion Plant Deactivation Project Begins at Paducah Gaseous Diffusion Plant October 21, 2014 - 5:00pm Addthis EM Paducah site lead Jennifer Woodard ...

  1. Portsmouth Gaseous Diffusion Plant - Quadrant I Groundwater Investigat...

    Office of Environmental Management (EM)

    Portsmouth Gaseous Diffusion Plant - Quadrant I Groundwater Investigative (5-Unit) Area Plume Portsmouth Gaseous Diffusion Plant - Quadrant I Groundwater Investigative (5-Unit) ...

  2. Paducah Gaseous Diffusion Plant - GW OU Southwest Plume | Department...

    Office of Environmental Management (EM)

    Southwest Plume Paducah Gaseous Diffusion Plant - GW OU Southwest Plume January 1, 2014 - ... InstallationName, State: Paducah Gaseous Diffusion Plant, KY Responsible DOE Office: ...

  3. Paducah Gaseous Diffusion Plant - GW OU Northeast Plume | Department...

    Office of Environmental Management (EM)

    Northeast Plume Paducah Gaseous Diffusion Plant - GW OU Northeast Plume January 1, 2014 - ... InstallationName, State: Paducah Gaseous Diffusion Plant, KY Responsible DOE Office: ...

  4. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant – November 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Preparedness for Severe Natural Phenomena Events at the Portsmouth Gaseous Diffusion Plant.

  5. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant- January 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution

  6. Senior DOE Officials Visit Paducah Gaseous Diffusion Plant Site...

    Energy Savers [EERE]

    Senior DOE Officials Visit Paducah Gaseous Diffusion Plant Site Senior DOE Officials Visit Paducah Gaseous Diffusion Plant Site April 29, 2015 - 12:00pm Addthis EM Paducah site ...

  7. Diffusion method of seperating gaseous mixtures

    DOE Patents [OSTI]

    Pontius, Rex B.

    1976-01-01

    A method of effecting a relatively large change in the relative concentrations of the components of a gaseous mixture by diffusion which comprises separating the mixture into heavier and lighter portions according to major fraction mass recycle procedure, further separating the heavier portions into still heavier subportions according to a major fraction mass recycle procedure, and further separating the lighter portions into still lighter subportions according to a major fraction equilibrium recycle procedure.

  8. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transfers; McCracken County, Kentucky | Department of Energy 27: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky SUMMARY DOE's Portsmouth/Paducah Project Office prepared an EA that assesses the potential environmental impacts of the proposed transfer of land and facilities at the Paducah Gaseous Diffusion Plant from DOE to other

  9. Non-Destructive Analysis Calibration Standards for Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (GDP) Decommissioning | Department of Energy Non-Destructive Analysis Calibration Standards for Gaseous Diffusion Plant (GDP) Decommissioning Non-Destructive Analysis Calibration Standards for Gaseous Diffusion Plant (GDP) Decommissioning The decommissioning of Gaseous Diffusion Plant facilities requires accurate, non-destructive assay (NDA) of residual enriched uranium in facility components for safeguards and nuclear criticality safety purposes. Current practices used to perform NDA

  10. DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion Plant |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Deactivation Contractor for Paducah Gaseous Diffusion Plant DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion Plant August 9, 2013 - 5:30pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Task Proposal (RTP) for deactivation activities at the Paducah Gaseous Diffusion Plant (GDP) in Paducah, Kentucky. These services are required so that DOE can address the return

  11. DOE Seeks Quotes for Paducah Gaseous Diffusion Plant Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Services | Department of Energy Quotes for Paducah Gaseous Diffusion Plant Environmental Technical Services DOE Seeks Quotes for Paducah Gaseous Diffusion Plant Environmental Technical Services August 13, 2012 - 12:00pm Addthis Media Contact Bill Taylor Bill.Taylor@srs.gov 803-952-8564 Cincinnati- The Department of Energy (DOE) today issued a Request for Quotation (RFQ) for an Environmental Technical Services acquisition at the Paducah Gaseous Diffusion Plant (GDP) for the

  12. DOE - Office of Legacy Management -- Paducah Gaseous Diffusion Plant - KY

    Office of Legacy Management (LM)

    01 Paducah Gaseous Diffusion Plant - KY 01 Site ID (CSD Index Number): KY.01 Site Name: Paducah Gaseous Diffusion Plant Site Summary: Site Link: http://energy.gov/pppo/paducah-site External Site Link: Alternate Name(s): Paducah Gaseous Diffusion Plant Alternate Name Documents: Location: Paducah, Kentucky Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Owned by the U.S. Department of Energy (DOE). DOE oversees

  13. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy Portsmouth Gaseous Diffusion Plant - April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah

  14. DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant Support Services | Department of Energy Portsmouth Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services December 9, 2014 - 3:37pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion

  15. DOE Seeks Proposals for Portsmouth Gaseous Diffusion Plant Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Contract | Department of Energy Proposals for Portsmouth Gaseous Diffusion Plant Technical Services Contract DOE Seeks Proposals for Portsmouth Gaseous Diffusion Plant Technical Services Contract June 19, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati - The Department of Energy today issued a Draft Request for Proposals (RFP) for an Environmental Technical Services acquisition at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio.

  16. OSTIblog Articles in the gaseous diffusion Topic | OSTI, US Dept...

    Office of Scientific and Technical Information (OSTI)

    Related Topics: 70th Anniversary, atomic bomb, DOE Research & Development (R&D) Accomplishments, electromagnetic, gaseous diffusion, Manhattan Project, nuclear chain reaction, ...

  17. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Draft Environmental Assessment (EA) for Potential Land and Facilities Transfers at the Paducah Gaseous Diffusion Plant in McCracken County, Kentucky. DOE is inviting comments on...

  18. EM Begins Demolishing K-31 Gaseous Diffusion Building

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM's demolition of the K-31 Building at Oak Ridge’s East Tennessee Technology Park (ETTP) began Wednesday, marking the removal of the fourth of five gaseous diffusion buildings at the former uranium enrichment site.

  19. DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Support Services | Department of Energy Small Businesses for Paducah Gaseous Diffusion Plant Infrastructure Support Services DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant Infrastructure Support Services June 10, 2014 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking eligible small businesses under North American Industry

  20. Paducah Gaseous Diffusion Plant Final Environmental Assessment for

    Energy Savers [EERE]

    DOE Site Tours Nostalgic for Former Workers Paducah DOE Site Tours Nostalgic for Former Workers July 15, 2016 - 9:35am Addthis Eugene Waggoner poses for a portrait in the C-300 Central Control Building at the Paducah Gaseous Diffusion Plant. (Story and photo by Dylan Nichols, Fluor Paducah Deactivation Project.) Eugene Waggoner poses for a portrait in the C-300 Central Control Building at the Paducah Gaseous Diffusion Plant. (Story and photo by Dylan Nichols, Fluor Paducah Deactivation Project.)

  1. DOE - Office of Legacy Management -- Portsmouth Gaseous Diffusion Plant -

    Office of Legacy Management (LM)

    026 Portsmouth Gaseous Diffusion Plant - 026 FUSRAP Considered Sites Site: Portsmouth Gaseous Diffusion Plant (026 ) More information at http://energy.gov/em Designated Name: Not Designated under FUSRAP Alternate Name: Portsmouth, OH, Site Location: Pike County, Ohio Evaluation Year: Not considered for FUSRAP - in another program Site Operations: Production of enriched uranium Site Disposition: Remediation in progress by DOE Office of Environmental Management. After the site is complete, it

  2. DOE Awards Contract for Paducah Gaseous Diffusion Plant Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support Services | Department of Energy Paducah Gaseous Diffusion Plant Infrastructure Support Services DOE Awards Contract for Paducah Gaseous Diffusion Plant Infrastructure Support Services June 17, 2015 - 5:45pm Addthis Media Contact: Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Swift & Staley, Inc. of Kevil, Kentucky, for the performance of infrastructure support services at the

  3. DOE Awards Contract for Portsmouth Gaseous Diffusion Plant Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support Services | Department of Energy Portsmouth Gaseous Diffusion Plant Infrastructure Support Services DOE Awards Contract for Portsmouth Gaseous Diffusion Plant Infrastructure Support Services January 15, 2016 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Portsmouth Mission Alliance, LLC of Idaho Falls, Idaho, for the performance of infrastructure

  4. DOE Releases Request for Information for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deactivation & Remediation Services | Department of Energy Paducah Gaseous Diffusion Plant Deactivation & Remediation Services DOE Releases Request for Information for Paducah Gaseous Diffusion Plant Deactivation & Remediation Services September 2, 2015 - 3:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Request for Information (RFI) seeking to solicit input via capability

  5. DOE Seeks Small Businesses for Portsmouth Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Support Services | Department of Energy Portsmouth Gaseous Diffusion Plant Infrastructure Support Services DOE Seeks Small Businesses for Portsmouth Gaseous Diffusion Plant Infrastructure Support Services July 2, 2014 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564, bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking eligible small businesses under North American Industry Classification System

  6. Portsmouth Gaseous Diffusion Plant- Quadrant I Groundwater Investigative (5-Unit) Area Plume

    Broader source: Energy.gov [DOE]

    Groundwater Database Report - Portsmouth Gaseous Diffusion Plant - Quadrant I Groundwater Investigative (5-Unit) Area Plume

  7. The K-25 Story

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Oak Ridge Office of Environmental Management shares the details behind the construction, operation, and demolition of Building K-25.

  8. K-25 East Wing Demolition Project Wraps Up, North End Work Next |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy East Wing Demolition Project Wraps Up, North End Work Next K-25 East Wing Demolition Project Wraps Up, North End Work Next September 14, 2012 - 12:00pm Addthis Oak Ridge, Tenn. - Oak Ridge's EM contractor URS | CH2M Oak Ridge LLC (UCOR) has completed demolition activities on the K-25 Building's east wing and is moving on to demolishing the north end. The K-25 Building, located at East Tennessee Technology Park (ETTP), was a former gaseous diffusion facility built as part

  9. Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant | Department of Energy Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant Full Document and Summary Versions are available for download Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant (436.49 KB) Summary - Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant (47.06 KB) More Documents & Publications Briefing: DOE EM ITR Landfill

  10. Paducah Gaseous Diffusion Plant environmental report for 1992

    SciTech Connect (OSTI)

    Horak, C.M.

    1993-09-01

    This two-part report, Paducah Gaseous Diffusion Plant Environmental Report for 1992, is published annually. It reflects the results of an environmental monitoring program designed to quantify potential increases in the concentration of contaminants and potential doses to the resident human population. The Paducah Gaseous Diffusion Plant (PGDP) overall goal for environmental management is to protect the environment and PGDP`s neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, reduce the generation of waste, and minimize hazardous waste by substitution of materials.

  11. Paducah Gaseous Diffusion Plant Environmental report for 1990

    SciTech Connect (OSTI)

    Counce-Brown, D.

    1991-09-01

    This two-part report, Paducah Gaseous Diffusion Plant Site Environmental Report for 1990, is published annually. It reflects the results of a comprehensive, year-round program to monitor the impact of operations at Paducah Gaseous Diffusion Plant (PGDP) on the area's groundwater and surface waters, soil, air quality, vegetation, and wildlife. In addition, an assessment of the effect of PGDP effluents on the resident human population is made. PGDP's overall goal for environmental management is to protect the environment and PGDP's neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, to reduce the formation of waste, and to minimize hazardous waste by substitution of materials.

  12. Federal Facility Agreement for the Paducah Gaseous Diffusion Plant Summary

    Office of Environmental Management (EM)

    Federal Facility Agreement for the Paducah Gaseous Diffusion Plant State Kentucky Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Ensure that the environmental impacts of activities at the Site are investigated and appropriate response actions are taken. Parties U.S. DOE; Kentucky Natural Resources and Environmental Protection Cabinet; U.S. EPA Date 2/01/1998 SCOPE * Ensure all releases of hazardous substances, pollutants, or contaminants are addressed to

  13. Paducah Gaseous Diffusion Plant Annual Site Environmental Report for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The purpose of this document is to summarize effluent monitoring and environmental surveillance results and compliance with environmental laws, regulations, and orders at the Paducah Gaseous Diffusion Plant (PGDP). Environmental monitoring at PGDP consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring is direct measurement or the collection and analysis of samples of liquid and gaseous discharges to the environment. Environmental surveillance is direct measurement or the collection and analysis of samples of air, water, soil, foodstuff, biota, and other media. Environmental monitoring is performed to characterize and quantify contaminants, assess radiation exposures of members of the public, demonstrate compliance with applicable standards and permit requirements, and detect and assess the effects (if any) on the local environment. Multiple samples are collected throughout the year and are analyzed for radioactivity, chemical content, and various physical attributes.

  14. K-25 D and D Challenges - 12170

    SciTech Connect (OSTI)

    Eidam, Greg [Bechtel National, Inc. (United States)

    2012-07-01

    Decontamination and decommissioning (D and D) of the K-25 former gaseous diffusion plant provides lessons learned applicable to other D and D projects in the DOE Complex. The 175,000- square-meter, 1.6-kilometer-long building is contaminated with highly enriched uranium (HEU), Tc-99, trace quantities of other fission products, asbestos, PCBs, and other hazardous wastes. Safety challenges include deteriorated electrical systems, significant structural degradation, and criticality and exposure risks. The project completely revised the D and D approach after a worker fell through an operating floor and was seriously injured. For protection from deteriorated building conditions, the project reduced the number of workers in the facility, limited their hours in the building, and installed nets and barriers to protect them from falls through weakened floors and from falling material. The new plan involved removing high-risk components, removing motors and compressors, and demolishing the building from the outside with heavy equipment with most of the piping and components inside the building during demolition. The team provided temporary electrical power; reconfigured the criticality alarm system; upgraded security; performed sampling and analysis to locate and characterize HEU deposits and Tc-99; and, to establish 'criticality incredible' conditions, conducted a nondestructive assay program and injected foam into equipment and piping as a contamination fixative. (authors)

  15. Portsmouth Gaseous Diffusion Plant Environmental report for 1990

    SciTech Connect (OSTI)

    Counce-Brown, D.

    1991-09-01

    This calendar year 1990 annual report on environmental surveillance of the US Department of Energy's (DOE's) Portsmouth Gaseous Diffusion Plant (PORTS) and its environs consists of two parts: the summary, discussion, and conclusions (Part 1) and the data presentation (Part 2). The objectives of this report are as follows: report 1990 monitoring data for the installation and its environs that may have been affected by operations on the plant site, provide reasonably detailed information about the plant site and plant operations, provide detailed information on input and assumptions used in all calculations, provide trend analyses (when appropriate) to indicate increases and decreases in environmental impact, and provide general information on plant quality assurance.

  16. DOE - Office of Legacy Management -- Oak Ridge Gaseous Diffusion Plant - TN

    Office of Legacy Management (LM)

    02 Oak Ridge Gaseous Diffusion Plant - TN 02 FUSRAP Considered Sites Site: Oak Ridge Gaseous Diffusion Plant (TN.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.mbe.doe.gov/me70/manhattan/come_through.htm Documents Related to Oak Ridge Gaseous Diffusion Plant

  17. DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support Services | Department of Energy Paducah Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services October 6, 2014 - 4:13pm Addthis Media Contact Bill Taylor, 803-952-8564, bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the performance of infrastructure support services at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky. A

  18. Voluntary Protection Program Onsite Review, Infrastructure Support Contract Paducah Gaseous Diffusion Plant- May 2013

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Infrastructure Support Contract Paducah Gaseous Diffusion Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

  19. EA-1856: Conveyance of Real Property at the Portsmouth Gaseous Diffusion Plant in Pike County, Ohio

    Broader source: Energy.gov [DOE]

    This EA will evaluate the environmental impacts of conveyance of land and facilities at the Portsmouth Gaseous Diffusion Plant, in Piketon, Ohio, for economic development purposes.

  20. Voluntary Protection Program Onsite Review, Infrastructure Support Contract Paducah Gaseous Diffusion Plant- March 2012

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether the Infrastructure Support Contract Paducah Gaseous Diffusion Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

  1. Portsmouth Gaseous Diffusion Plant annual site environmental report for 1993

    SciTech Connect (OSTI)

    Horak, C.M.

    1994-11-01

    This calendar year (CY) 1993 annual report on environmental monitoring of the US Department of Energy`s (DOE`s) Portsmouth Gaseous Diffusion Plant (Portsmouth) and its environs consists of three separate documents: a summary pamphlet for the general public; a more detail discussion and of compliance status, data, and environmental impacts (this document); and a volume of detailed data that is available on request. The objectives of this report are to report compliance status during 1993; provide information about the plant site and plant operations; report 1993 monitoring data for the installation and its environs that may have been affected by operations on the plant site; document information on input and assumptions used in calculations; provide trend analyses (where appropriate) to indicate increases and decreases in environmental impact, and provide general information on quality assurance for the environmental monitoring program.

  2. Paducah Gaseous Diffusion Plant environmental report for 1989

    SciTech Connect (OSTI)

    Turner, J.W. )

    1990-10-01

    This two-part environmental report is published annually. It reflects the results of a comprehensive, year-round program to monitor the impact of operations at Paducah Gaseous Diffusion Plant (PGDP) on the area's groundwater and surface waters, soil, air quality, vegetation, and wildlife. In addition, an assessment of the effect of PGDP effluents on the resident human population is made. PGDP's overall goal for environmental management is to protect the environment and PGDP's neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, to reduce the formation of waste, and to minimize hazardous waste by substitution of materials. 36 refs.

  3. Seismic issues at the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Fricke, K.E. )

    1989-11-01

    A seismic expert workshop was held at the Paducah Gaseous Diffusion Plant (PGDP) on March 13--15, 1989. the PGDP is operated by Martin Marietta Energy Systems, Inc. for the United States Department of Energy (DOE). During the last twenty years the design criteria for natural phenomenon hazards has steadily become more demanding at all of the DOE Oak Ridge Operations (ORO) sites. The purpose of the two-day workshop was to review the seismic vulnerability issues of the PGDP facilities. Participants to the workshop included recognized experts in the fields of seismic engineering, seismology and geosciences, and probabilistic analysis, along with engineers and other personnel from Energy Systems. A complete list of the workshop participants is included in the front of this report. 29 refs.

  4. Portsmouth Gaseous Diffusion Plant environmental report for 1989

    SciTech Connect (OSTI)

    Turner, J.W. )

    1990-10-01

    This calendar year 1989 annual report on environmental surveillance of the US Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS) and its environs consists of two parts: the Summary, Discussion, and Conclusions (Part 1) and the Data Presentation (Part 2). The objectives of this report are the following: report 1989 monitoring data for the installation and its environs that may have been affected by operations on the plant site, provide reasonably detailed information about the plant site and plant operations, provide detailed information on input and assumptions used in all calculations, provide trend analyses (where appropriate) to indicate increases and decreases in environmental impact, and provide general information on plant quality assurance. Routine monitoring and sampling for radiation, radioactive materials, and chemical substances on and off the DOE site are used to document compliance with appropriate standards, to identify trends, to provide information for the public, and to contribute to general environmental knowledge. The surveillance program assists in fulfilling the DOE policy of protecting the public, employees, and environment from harm that could be caused by its activities and reducing negative environmental impacts to the greatest degree practicable. Environmental-monitoring information complements data on specific releases, trends, and summaries. 26 refs.

  5. Innovative Decontamination Technology for Use in Gaseous Diffusion Plant Decommissioning

    SciTech Connect (OSTI)

    Peters, M.J.; Norton, C.J.; Fraikor, G.B.; Potter, G.L.; Chang, K.C.

    2006-07-01

    The results of bench scale tests demonstrated that TechXtract{sup R} RadPro{sup TM} technology (hereinafter referred to as RadPro{sup R}) can provide 100% coverage of complex mockup gaseous diffusion plant (GDP) equipment and can decontaminate uranium (U) deposits with 98% to 99.99% efficiency. Deployment tests demonstrated RadPro{sup R} can be applied as foam, mist/fog, or steam, and fully cover the internal surfaces of complex mockup equipment, including large piping. Decontamination tests demonstrated that two formulations of RadPro{sup R}, one with neutron attenuators and one without neutron attenuators, could remove up to 99.99% of uranyl fluoride deposits, one of the most difficult to remove deposits in GDP equipment. These results were supplemented by results from previous tests conducted in 1994 that showed RadPro{sup R} could remove >97% of U and Tc-99 contamination from actual GDP components. Operational use of RadPro{sup R} at other DOE and commercial facilities also support these data. (authors)

  6. Bioavailability study for the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Phipps, T.L.; Kszos, L.A.

    1996-08-01

    The overall purpose of this plan is to assess the bioavailability of metals in the continuous and intermittent outfalls. The results may be used to determine alternative metal limits that more appropriately measure the portion of metal present necessary for toxicity to aquatic life. These limits must remain protective of in-stream aquatic life; thus, the highest concentration of metal in the water will be determined concurrently with an assessment of acute or chronic toxicity on laboratory tests. Using the method developed by the Kentucky Division of Water (KDOW), biomonitoring results and chemical data will be used to recommend alternative metal limits for the outfalls of concern. The data will be used to meet the objectives of the study: (1) evaluate the toxicity of continuous outfalls and intermittent outfalls at Paducah Gaseous Diffusion Plant; (2) determine the mean ratio of dissolved to Total Recoverable metal for Cd, Cr, Cu, Pb, Ni, and Zn in the continuous and intermittent outfalls; (3) determine whether the concentration of total recoverable metal discharged causes toxicity to fathead minnows and /or Ceriodaphnia; and (4) determine alternative metal limits for each metal of concern (Cd, Cr, Cu, Pb, Ni, and Zn).

  7. Paducah Gaseous Diffusion Plant Northwest Plume interceptor system evaluation

    SciTech Connect (OSTI)

    Laase, A.D.; Clausen, J.L.

    1998-07-01

    The Paducah Gaseous Diffusion Plant (PGDP) recently installed an interceptor system consisting of four wells, evenly divided between two well fields, to contain the Northwest Plume. As stated in the Northwest Plume Record of Decision (ROD), groundwater will be pumped at a rate to reduce further contamination and initiate control of the northwest contaminant plume. The objective of this evaluation was to determine the optimum (minimal) well field pumping rates required for plume hotspot containment. Plume hotspot, as defined in the Northwest Plume ROD and throughout this report, is that portion of the plume with trichloroethene (TCE) concentrations greater than 1,000 {micro}g/L. An existing 3-dimensional groundwater model was modified and used to perform capture zone analyses of the north and south interceptor system well fields. Model results suggest that the plume hotspot is not contained at the system design pumping rate of 100 gallons per minute (gal/min) per well field. Rather, the modeling determined that north and south well field pumping rates of 400 and 150 gal/min, respectively, are necessary for plume hotspot containment. The difference between the design and optimal pumping rates required for containment can be attributed to the discovery of a highly transmissive zone in the vicinity of the two well fields.

  8. IAEA verification experiment at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Subudhi, M.; Calvert, O.L.; Bonner, T.N.; Adams, J.G.; Cherry, R.C.; Whiting, N.E.

    1998-08-01

    In April 1996, the United States (US) added the Portsmouth Gaseous Diffusion Plant to the list of facilities eligible for the application of International Atomic Energy Agency (IAEA) safeguards. At that time, the US proposed that the IAEA carry out a Verification Experiment at the plant with respect to the downblending of about 13 metric tons of highly enriched uranium (HEU) in the form of UF{sub 6}. This material is part of the 226 metric tons of fissile material that President Clinton has declared to be excess to US national-security needs and which will be permanently withdrawn from the US nuclear stockpile. In September 1997, the IAEA agreed to carry out this experiment, and during the first three weeks of December 1997, the IAEA verified the design information concerning the downblending process. The plant has been subject to short-notice random inspections since December 17, 1997. This paper provides an overview of the Verification Experiment, the monitoring technologies used in the verification approach, and some of the experience gained to date.

  9. DOE Releases Final Request for Proposal for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deactivation and Remediation Services | Department of Energy Releases Final Request for Proposal for Paducah Gaseous Diffusion Plant Deactivation and Remediation Services DOE Releases Final Request for Proposal for Paducah Gaseous Diffusion Plant Deactivation and Remediation Services July 21, 2016 - 2:00pm Addthis Media Contact: Lynette Chafin, 513-246-0461 Cincinnati -- The U.S. Department of Energy (DOE) today issued a Request for Proposals (RFP) for deactivation and remediation services

  10. Nuclear criticality safety aspects of gaseous uranium hexafluoride (UF{sub 6}) in the diffusion cascade

    SciTech Connect (OSTI)

    Huffer, J.E.

    1997-04-01

    This paper determines the nuclear safety of gaseous UF{sub 6} in the current Gaseous Diffusion Cascade and auxiliary systems. The actual plant safety system settings for pressure trip points are used to determine the maximum amount of HF moderation in the process gas, as well as the corresponding atomic number densities. These inputs are used in KENO V.a criticality safety models which are sized to the actual plant equipment. The ENO V.a calculation results confirm nuclear safety of gaseous UF{sub 6} in plant operations..

  11. EA-1856: Conveyance of Land and Facilities at the Portsmouth Gaseous Diffusion Plant for Economic Development Purposes, Piketon, Ohio

    Broader source: Energy.gov [DOE]

    This EA will evaluate the environmental impacts of conveyance of land and facilities at the Portsmouth Gaseous Diffusion Plant, in Piketon, Ohio, for economic development purposes.

  12. U.S., Ohio Approve Portsmouth Gaseous Diffusion Plant Site D&D Plans |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy , Ohio Approve Portsmouth Gaseous Diffusion Plant Site D&D Plans U.S., Ohio Approve Portsmouth Gaseous Diffusion Plant Site D&D Plans July 30, 2015 - 3:00pm Addthis The Portsmouth Site’s large process buildings and other facilities are shown here. The Portsmouth Site's large process buildings and other facilities are shown here. PIKETON, Ohio - The Ohio Environmental Protection Agency (Ohio EPA) and DOE have agreed to a plan to demolish the massive, iconic

  13. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones.

  14. D&D of the French High Enrichment Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    BEHAR, Christophe; GUIBERTEAU, Philippe; DUPERRET, Bernard; TAUZIN, Claude

    2003-02-27

    This paper describes the D&D program that is being implemented at France's High Enrichment Gaseous Diffusion Plant, which was designed to supply France's Military with Highly Enriched Uranium. This plant was definitively shut down in June 1996, following French President Jacques Chirac's decision to end production of Highly Enriched Uranium and dismantle the corresponding facilities.

  15. Real Time Demonstration Project XRF Performance Evaluation Report for Paducah Gaseous Diffusion Plant AOC 492

    SciTech Connect (OSTI)

    Johnson, Robert L

    2008-04-03

    This activity was undertaken to demonstrate the applicability of market-available XRF instruments to quantify metal concentrations relative to background and risk-based action and no action levels in Paducah Gaseous Diffusion Plant (PGDP) soils. As such, the analysis below demonstrates the capabilities of the instruments relative to soil characterization applications at the PGDP.

  16. In situ carbonyl extraction of Ni from gaseous diffusion cells

    SciTech Connect (OSTI)

    Visnapuu, A. [USBM Salt Lake Research Center, Salt Lake City, UT (United States); Hollenberg, G.W. [Battelle Pacific Northwest Lab., Richland, WA (United States); Bundy, R.D. [Battelle Memorial Institute, Oak Ridge, TN (United States)

    1995-12-31

    This paper discusses the use of carbonyl processing technology for recovery of nickel from uranium isotope separation diffusion cells, and potential applications to recover nickel, iron, chromium, cobalt, and other carbonyl forming metals from nuclear waste while reducing the volume of the high level residue for more economic disposal. Nickel powder was carbonylated under static and dynamic conditions using only carbon monoxide to determine if the nickel powder would react rapidly enough to require no promoter. Nickel to Ni(CO){sub 4} conversion was realized in all cases and nickel metal was vapor deposited in the thermal decomposer, but the conversion rates in all cases the reaction were too slow for practical recovery. Addition of hydrogen sulfide gas as a promoter increased the conversion rate more than 500-fold over conversion with no promoter. Test summaries are provided in the paper; results indicate that promoter activated carbonylation is a viable approach for recovery of nickel from uranium isotope diffusion cells.

  17. Long-range global warming impact of gaseous diffusion plant operation

    SciTech Connect (OSTI)

    Trowbridge, L.D.

    1992-09-01

    The DOE gaseous diffusion plant complex makes extensive use of CFC-114 as a primary coolant. As this material is on the Montreal Protocol list of materials scheduled for production curtailment, a substitute must be found. In addition to physical cooling properties, the gaseous diffusion application imposes the unique requirement of chemical inertness to fluorinating agents. This has narrowed the selection of a near-term substitute to two fully fluorinated material, FC-318 and FC-3110, which are likely to be strong, long-lived greenhouse gases. In this document, calculations are presented showing, for a number of plausible scenarios of diffusion plant operation and coolant replacement strategy, the future course of coolant use, greenhouse gas emissions (including coolant and power-related indirect CO{sub 2} emissions), and the consequent global temperature impacts of these scenarios.

  18. Natural phenomena hazards evaluation of equipment and piping of Gaseous Diffusion Plant Uranium Enrichment Facility

    SciTech Connect (OSTI)

    Singhal, M.K.; Kincaid, J.H.; Hammond, C.R.; Stockdale, B.I.; Walls, J.C.; Brock, W.R.; Denton, D.R.

    1995-12-31

    In support of the Gaseous Diffusion Plant Safety Analysis Report Upgrade program (GDP SARUP), a natural phenomena hazards evaluation was performed for the main process equipment and piping in the uranium enrichment buildings at Paducah and Portsmouth gaseous diffusion plants. In order to reduce the cost of rigorous analyses, the evaluation methodology utilized a graded approach based on an experience data base collected by SQUG/EPRI that contains information on the performance of industrial equipment and piping during past earthquakes. This method consisted of a screening walkthrough of the facility in combination with the use of engineering judgment and simple calculations. By using these screenings combined with evaluations that contain decreasing conservatism, reductions in the time and cost of the analyses were significant. A team of experienced seismic engineers who were trained in the use of the DOE SQUG/EPRI Walkdown Screening Material was essential to the success of this natural phenomena hazards evaluation.

  19. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites.

  20. Nuclear criticality safety evaluation of Spray Booth Operations in X-705, Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Sheaffer, M.K.; Keeton, S.C.

    1993-09-20

    This report evaluates nuclear criticality safety for Spray Booth Operations in the Decontamination and Recovery Facility, X-705, at the Portsmouth Gaseous Diffusion Plant. A general description of current procedures and related hardware/equipment is presented. Control parameters relevant to nuclear criticality safety are explained, and a consolidated listing of administrative controls and safety systems is developed. Based on compliance with DOE Orders and MMES practices, the overall operation is evaluated, and recommendations for enhanced safety are suggested.

  1. OSTIblog Articles in the gaseous diffusion Topic | OSTI, US Dept of Energy

    Office of Scientific and Technical Information (OSTI)

    Office of Scientific and Technical Information gaseous diffusion Topic The Manhattan Project -- Its Operations by Mary Schorn 29 Nov, 2012 in Science Communications 4236 ManhattanProjectMap320.jpg The Manhattan Project -- Its Operations Read more about 4236 Major operations for the Manhattan Engineer District (Manhattan Project) took place in remote site locations in the states of Tennessee, New Mexico, and Washington, with additional research being conducted in university laboratories at

  2. Third report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect (OSTI)

    Hinzman, R.L.; Adams, S.M.; Ashwood, T.L.

    1995-08-01

    As a condition of the modified National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site) on September 11, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream (Mitchell Branch or K-1700 stream). On October 1, 1992, a renewed NPDES permit was issued for the K-25 Site. A biological monitoring plan was submitted for Mitchell Branch, Poplar Creek, Poplar Creek Embayment of the Clinch River and any unnamed tributaries of these streams. The objectives of BMAP are to (1) demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life and (2) document the effects on stream biota resulting from operation of major new pollution abatement facilities, including the Central Neutralization Facility (CNF) and the Toxic Substances Control Act (TSCA) incinerator. The BMAP consists of four tasks: (1) toxicity monitoring; (2) bioaccumulation monitoring; (3) assessment of fish health; and (4) instream monitoring of biological communities, including benthic macroinvertebrates and fish. This document, the third in a series, reports on the results of the Oak Ridge K-25 Site BMAP; it describes studies that were conducted over various periods of time between June 1990 and December 1993, although monitoring conducted outside this time period is included, as appropriate.

  3. EA-0767: Construction and Experiment of an Industrial Solid Waste Landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to construct and operate a solid waste landfill within the boundary at the U.S. Department of Energy's Portsmouth Gaseous Diffusion plant...

  4. Site-specific earthquake response analysis for Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    SciTech Connect (OSTI)

    Sykora, D.W.; Davis, J.J.

    1993-08-01

    The Paducah Gaseous Diffusion Plant (PGDP), owned by the US Department of Energy (DOE) and operated under contract by Martin Marietta Energy systems, Inc., is located southwest of Paducah, Kentucky. An aerial photograph and an oblique sketch of the plant are shown in Figures 1 and 2, respectively. The fenced portion of the plant consists of 748 acres. This plant was constructed in the 1950`s and is one of only two gaseous diffusion plants in operation in the United States; the other is located near Portsmouth, Ohio. The facilities at PGDP are currently being evaluated for safety in response to natural seismic hazards. Design and evaluation guidelines to evaluate the effects of earthquakes and other natural hazards on DOE facilities follow probabilistic hazard models that have been outlined by Kennedy et al. (1990). Criteria also established by Kennedy et al. (1990) classify diffusion plants as ``moderate hazard`` facilities. The US Army Engineer Waterways Experiment Station (WES) was tasked to calculate the site response using site-specific design earthquake records developed by others and the results of previous geotechnical investigations. In all, six earthquake records at three hazard levels and four individual and one average soil columns were used.

  5. Investigation of gas-phase decontamination of internally radioactively contaminated gaseous diffusion process equipment and piping

    SciTech Connect (OSTI)

    Bundy, R.D.; Munday, E.B.

    1991-01-01

    Construction of the gaseous diffusion plants (GDPs) was begun during World War 2 to produce enriched uranium for defense purposes. These plants, which utilized UF{sub 6} gas, were used primarily for this purpose through 1964. From 1959 through 1968, production shifted primarily to uranium enrichment to supply the nuclear power industry. Additional UF{sub 6}-handling facilities were built in feed and fuel-processing plants associated with the uranium enrichment process. Two of the five process buildings at Oak ridge were shut down in 1964. Uranium enrichment activities at Oak Ridge were discontinued altogether in 1985. In 1987, the Department of Energy (DOE) decided to proceed with a permanent shutdown of the Oak Ridge Gaseous Diffusion Plant (ORGDP). DOE intends to begin decommissioning and decontamination (D D) of ORGDP early in the next century. The remaining two GDPs are expected to be shut down during the next 10 to 40 years and will also require D D, as will the other UF{sub 6}-handling facilities. This paper presents an investigation of gas- phase decontamination of internally radioactively contaminated gaseous diffusion process equipment and piping using powerful fluorinating reagents that convert nonvolatile uranium compounds to volatile UF{sub 6}. These reagents include ClF{sub 3}, F{sub 2}, and other compounds. The scope of D D at the GDPs, previous work of gas-phase decontamination, four concepts for using gas-phase decontamination, plans for further study of gas-phase decontamination, and the current status of this work are discussed. 13 refs., 15 figs.

  6. Replacement of chlorofluorocarbons (CFCs) at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; Saylor, R.E.; McCold, L.N.

    1994-06-01

    The US Department of Energy (DOE) formerly operated two gaseous diffusion plants (GDPs) for enriching uranium and maintained a third shutdown GDP. These plants maintain a large inventory of dichlorotetrafluorethane (CFC-114), a cholorofluorocarbon (CFC), as a coolant. The paper evaluates the global impacts of four alternatives to modify GDP coolant system operations for a three-year period beginning in 1996. Interim modification of GDP coolant system operations has the potential to reduce stratospheric ozone depletion from GDP coolant releases while a permanent solution is studied.

  7. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment for Potential Land and Facilities Transfers

    Broader source: Energy.gov [DOE]

    DOE is evaluating the potential conveyance (lease, easement, and/or title transfer) of real property that may be determined to be excessed, underutilized or unneeded at the Paducah Gaseous Diffusion Plant (PGDP). After appropriate agency reviews, DOE could transfer PGDP real property to one or more entities for a range of economic development and/or recreational uses. DOEs potential action is designed to reduce the footprint of the site and the cost for maintenance of the site, providing opportunities for beneficial reuse. DOE prepared this Draft Environmental Assessment (EA) to analyze the potential environmental consequences associated with potential land and facilities transfers.

  8. Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant

    Office of Environmental Management (EM)

    OH EM Project: On-Site Disposal Facility ETR Report Date: February 2008 ETR-12 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant Why DOE-EM Did This Review The On-Site Waste Disposal Facility (OSWDF) is proposed for long-term containment of contaminated materials from the planned Decontamination and Decommissioning (D&D) activities at the

  9. Construction and operation of an industrial solid waste landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    SciTech Connect (OSTI)

    1995-10-01

    The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastes for disposal.

  10. Nuclear criticality safety evaluation of large cylinder cleaning operations in X-705, Portsmouth Gaseous diffusion Plant

    SciTech Connect (OSTI)

    Sheaffer, M.K.; Keeton, S.C.; Lutz, H.F.

    1995-06-01

    This report evaluates nuclear criticality safety for large cylinder cleaning operations in the Decontamination and Recovery Facility, X-705, at the Portsmouth Gaseous Diffusion Plant. A general description of current cleaning procedures and required hardware/equipment is presented, and documentation for large cylinder cleaning operations is identified and described. Control parameters, design features, administrative controls, and safety systems relevant to nuclear criticality are discussed individually, followed by an overall assessment based on the Double Contingency Principle. Recommendations for enhanced safety are suggested, and issues for increased efficiency are presented.

  11. The Blend Down Monitoring System Demonstration at the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Benton, J.; Close, D.; Johnson, W., Jr.; Kerr, P.; March-Leuba, J.; Mastal, E.; Moss, C.; Powell, D.; Sumner, J.; Uckan, T.; Vines, R.; Wright, P.D.

    1999-07-25

    Agreements between the governments of the US and the Russian Federation for the US purchase of low enriched uranium (LEU) derived from highly enriched uranium (HEU) from dismantled Russian nuclear weapons calls for the establishment of transparency measures to provide confidence that nuclear nonproliferation goals are being met. To meet these transparency goals, the agreements call for the installation of nonintrusive US instruments to monitor the down blending of HEU to LEU. The Blend Down Monitoring System (BDMS) has been jointly developed by the Los Alamos National Laboratory (LANL) and the Oak Ridge National Laboratory (ORNL) to continuously monitor {sup 235}U enrichments and mass flow rates at Russian blending facilities. Prior to its installation in Russian facilities, the BDMS was installed and operated in a UF{sub 6} flow loop in the Paducah Gaseous Diffusion Plant simulating flow and enrichment conditions expected in a typical down-blending facility. A Russian delegation to the US witnessed the equipment demonstration in June, 1998. To conduct the demonstration in the Paducah Gaseous Diffusion Plant (PGDP), the BDMS was required to meet stringent Nuclear Regulatory Commission licensing, safety and operational requirements. The Paducah demonstration was an important milestone in achieving the operational certification for the BDMS use in Russian facilities.

  12. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows.

  13. Type B Accident Investigation of the July 12, 2007, Forklift and Pedestrian Accident at the Paducah Gaseous Diffusion Plant, Portsmouth/Paducah Project Office

    Broader source: Energy.gov [DOE]

    On July 12, 2007, an employee at the Paducah Gaseous Diffusion Plant (PGDP) was walking alone during her scheduled lunch period.

  14. First report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect (OSTI)

    Smith, J.G.; Adams, S.M.; Kszos, L.A.; Ryon, M.G.; Southworth, G.R.; Loar, J.M.

    1993-08-01

    A modified National Pollutant Discharge Elimination System permit was issued to the Oak Ridge Gaseous Diffusion Plant (now referred to as the Oak Ridge K-25 Site) on September 11, 1986. The Oak Ridge K-25 Site is a former uranium-enrichment production facility, which is currently managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy. As required in Part III (L) of that permit, a plan for the biological monitoring of Mitchell Branch (K-1700 stream) was prepared and submitted for approval to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation [formerly the Tennessee Department of Health and Environment (Loar et al. 1992b)]. The K-25 Site Biological Monitoring and Abatement Program (BMAP) described biomonitoring activities that would be conducted over the duration of the permit. Because it was anticipated that the composition of existing effluent streams entering Mitchell Branch would be altered shortly after the modified permit was issued, sampling of the benthic invertebrate and fish communities (Task 4 of BMAP) was initiated in August and September 1986 respectively.

  15. Reassessment of liquefaction potential and estimation of earthquake- induced settlements at Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    SciTech Connect (OSTI)

    Sykora, D.W.; Yule, D.E.

    1996-04-01

    This report documents a reassessment of liquefaction potential and estimation of earthquake-induced settlements for the U.S. Department of Energy (DOE), Paducah Gaseous Diffusion Plant (PGDP), located southwest of Paducah, KY. The U.S. Army Engineer Waterways Experiment Station (WES) was authorized to conduct this study from FY91 to FY94 by the DOE, Oak Ridge Operations (ORO), Oak Ridge, TN, through Inter- Agency Agreement (IAG) No. DE-AI05-91OR21971. The study was conducted under the Gaseous Diffusion Plant Safety Analysis Report (GDP SAR) Program.

  16. Study of technetium uptake in vegetation in the vicinity of the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Acox, T.A.

    1982-01-01

    Technetium-99 was measured in vegetation and soil collected on and near the Portsmouth Gaseous Diffusion Plant to obtain an estimate of the soil-to-vegetation concentration factors. The concentration factors appear to be lognormally distributed with a geometric mean of 3.4 (Bq/kg dry wt. tissue per Bq/kg dry wt. soil) and a geometric standard deviation of 4.7. A dose commitment was calculated using a hypothetical 3.7 x 10/sup 10/ Bq Tc-99/year release and the actual CY-1981 concentration release of Tc-99. The radiological significance of Tc-99 in the terrestial food chain is substantially less than previously believed.

  17. Report on the biological monitoring program at Paducah Gaseous Diffusion Plant December 1990 to November 1992

    SciTech Connect (OSTI)

    Kszos, L.A.

    1994-03-01

    On September 23, 1987, the Commonwealth of Kentucky Natural Resources and Environmental Protection Cabinet issued an Agreed Order that required the development of a Biological Monitoring Program (BMP) for the Paducah Gaseous Diffusion Plant (PGDP). Beginning in fall 1991, the Environmental Sciences Division (ESD) at Oak Ridge National Lab (ORNL) added data collection and report preparation to its responsibilities for the PGDP BMP. The BMP has been continued because it has proven to be extremely valuable in identifying those effluents with the potential for adversely affecting instream fauna, assessing the ecological health of receiving streams, guiding plans for remediation, and protecting human health. In September 1992, a renewed permit was issued which requires toxicity monitoring of continuous and intermittent outfalls on a quarterly basis. The BMP for PGDP consists of three major tasks: (1) effluent and ambient toxicity monitoring, (2) bioaccumulation studies, and (3) ecological surveys of stream communities. This report includes ESD/ORNL activities occurring from December 1990 to November 1992.

  18. Report on the Biological Monitoring Program at Paducah Gaseous Diffusion Plant December 1992--December 1993

    SciTech Connect (OSTI)

    Kszos, L.A.; Hinzman, R.L.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.

    1995-06-01

    On September 24, 1987, the Commonwealth of Kentucky Natural Resources and Environmental Protection Cabinet issued an Agreed Order that required the development of a Biological Monitoring Program (BMP) for the Paducah Gaseous Diffusion Plant (PGDP). The goals of BMP are to demonstrate that the effluent limitations established for PGDP protect and maintain the use of Little Bayou and Big Bayou creeks for growth and propagation of fish and other aquatic life, characterize potential health and environmental impacts, document the effects of pollution abatement facilities on stream biota, and recommend any program improvements that would increase effluent treatability. The BMP for PGDP consists of three major tasks: effluent and ambient toxicity monitoring, bioaccumulation studies, and ecological surveys of stream communities (i.e., benthic macroinvertebrates and fish). This report includes ESD activities occurring from December 1992 to December 1993, although activities conducted outside this time period are included as appropriate.

  19. Paducah Gaseous Diffusion Plant Annual Site Environmental Report summary for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This report contains summaries of the environmental programs at Paducah Gaseous Diffusion Plant, environmental monitoring and the results, and the impact of operations on the environment and the public for 1993. The environmental monitoring program at Paducah includes effluent monitoring and environmental surveillance. Effluent monitoring is measurement of releases as they occur. Contaminants are released through either airborne emissions or liquids discharged from the plant. These releases occur as part of normal site operations, such as cooling water discharged from the uranium enrichment cascade operations or airborne releases from ventilation systems. In the event of system failure, this monitoring provides timely warning so that corrective action can be taken before releases reach an unsafe level. Environmental surveillance tracks the dispersion of materials into the environment after they have been released. This involves the collection of samples from various media, such as water, soil, vegetation, and food crops, and the analysis of these samples for certain radionuclides, chemicals, and metals.

  20. Seismically-induced soil amplification at the DOE Paducah Gaseous Diffusion Plant site

    SciTech Connect (OSTI)

    Sykora, D.W.; Haynes, M.E. . Geotechnical Lab.); Brock, W.R.; Hunt, R.J.; Shaffer, K.E. )

    1991-01-01

    A site-specific earthquake site response (soil amplification) study is being conducted for the Department of Energy (DOE), Paducah Gaseous Diffusion Plant (PGDP). This study is pursuant to an upgraded Final Safety Analysis Report in accordance with requirements specified by DOE. The seismic hazard at PGDP is dominated by the New Madrid Seismic Zone. Site-specific synthetic earthquake records developed by others were applied independently to four soil columns with heights above baserock of about 325 ft. The results for the 1000-year earthquake event indicate that the site period is between 1.0 and 1.5 sec. Incident shear waves are amplified at periods of motion greater than 0.15 sec. The peak free-field horizontal acceleration, occurring at very low periods, is 0.28 g. 13 refs., 13 figs.

  1. Local drainage analyses of the Paducah and Portsmouth Gaseous Diffusion Plants during an extreme storm

    SciTech Connect (OSTI)

    Johnson, R.O.; Wang, J.C.; Lee, D.W.

    1993-11-01

    Local drainage analyses have been performed for the Paducah and Portsmouth Gaseous Diffusion Plants during an extreme storm having an approximate 10,000-yr recurrence interval. This review discusses the methods utilized to accomplish the analyses in accordance with US Department of Energy (DOE) design and evaluation guidelines, and summarizes trends, results, generalizations, and uncertainties applicable to other DOE facilities. Results indicate that some culverts may be undersized, and that the storm sewer system cannot drain the influx of precipitation from the base of buildings. Roofs have not been designed to sustain ponding when the primary drainage system is clogged. Some underground tunnels, building entrances, and ground level air intakes may require waterproofing.

  2. Portsmouth Gaseous Diffusion Plant Annual Site Environmental Report summary for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This report contains summaries of the environmental programs at Paducah Gaseous Diffusion Plant, environmental monitoring and the results, and the impact of operations on the environment and the public for 1993. The environmental monitoring program at Paducah includes effluent monitoring and environmental surveillance. Effluent monitoring is measurement of releases as they occur. Contaminants are released through either airborne emissions or liquids discharged from the plant. These releases occur as part of normal site operations, such as cooling water discharged from the uranium enrichment cascade operations or airborne releases from ventilation systems. In the event of system failure, this monitoring provides timely warning so that corrective action can be taken before releases reach an unsafe level. Environmental surveillance tracks the dispersion of materials into the environment after they have been released. This involves the collection of samples from various media, such as water, soil, vegetation, and food crops, and the analysis of these samples for certain radionuclides, chemicals, and metals.

  3. A probabilistic safety analysis of UF{sub 6} handling at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Boyd, G.J.; Lewis, S.R.; Summitt, R.L.

    1991-12-31

    A probabilistic safety study of UF{sub 6} handling activities at the Portsmouth Gaseous Diffusion Plant has recently been completed. The analysis provides a unique perspective on the safety of UF{sub 6} handling activities. The estimated release frequencies provide an understanding of current risks, and the examination of individual contributors yields a ranking of important plant features and operations. Aside from the probabilistic results, however, there is an even more important benefit derived from a systematic modeling of all operations. The integrated approach employed in the analysis allows the interrelationships among the equipment and the required operations to be explored in depth. This paper summarizes the methods used in the study and provides an overview of some of the technical insights that were obtained. Specific areas of possible improvement in operations are described.

  4. Surfactant-enhanced aquifer remediation at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Jackson, R.E.; Londergan, J.T.; Pickens, J.F.

    1995-10-01

    Many DOE facilities are situated in areas of sand and gravel which have become polluted with dense, non-aqueous phase liquids or DNAPLs, such as chlorinated solvents, from the various industrial operations at these facilities. The presence of such DNAPLs in sand and gravel aquifers is now recognized as the principal factor in the failure of standard ground-water remediation methods. The principal objective of this study, as stated in the Statement of Work of the contract (DE-AC21-92MC29111), is to demonstrate that multi-component DNAPLs can be readily solubilized in sand and gravel aquifers by dilute surfactant solutions. The specific objectives of the contract are: to identify dilute surfactants or blends of surfactants in the laboratory that will efficiently extract multi-component DNAPLs from sand and gravel aquifers by micellar solubilization (Phase 1); 2. to test the efficacy of the identified surfactants or blends of surfactants to solubilize in situ perchloroethylene (PCE) and trichloroethylene (TCE) DNAPLs by the injection and the subsequent extraction through an existing well or wells at a government-owned contaminated site (Phase 1); and 3. to demonstrate the full-scale operation of this remedial technology at a government-owned contaminated site (Phase 2). Specific objective number 1 has been completed and reported to DOE. However, the results of the test referred to in specific objective number 2, conducted at Paducah Gaseous Diffusion Plant in 1994, were inconclusive. Following this first test, it was decided by DOE and INTERA to move the test site elsewhere due to difficulties with obtaining core samples of the sand and gravel aquifer containing the DNAPL and with ascertaining the location of the DNAPL relative to the injection well. The solubilization test at the Portsmouth Gaseous Diffusion Plant (PORTS) will constitute the second test of Phase 1 of this contract.

  5. Oak Ridge Reservation Volume 2. Records relating to cesium at the K-25 Plant: A guide to record series of the Department of Energy and its contractors

    SciTech Connect (OSTI)

    1995-02-21

    The purpose of this guide is to describe the documents and record series at the K-25 plant that pertain to the handling of waste containing cesium-137 produced as a result of processes to enrich uranium and separate plutonium at the Department of Energy`s (DOE) Oak Ridge National Laboratory (ORNL) and Oak Ride Gaseous Diffusion Plant (ORGDP, called K-25) in Oak Ridge, Tennessee. History Associates Incorporated (HAI) prepared this guide as part of DOE`s Epidemiologic Records Inventory Project, the purpose of which is to verify and conduct inventories of epidemiologic and health-related records at various DOE and DOE contractor sites. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in it. Specific attention is given to the history of the DOE-Oak Ridge Reservation, the history and development of the K-25 plant, the creation and handling of cesium-contaminated waste, and environmental monitoring efforts at ORNL and K-25 from the late 1940s to the present. This introduction also presents the methodology used to identify the documents and series pertaining to cesium, a discussion of the inventory of these documents, information concerning access to the site and the records, and a description of the arrangement of the chapters.

  6. An Aerial Radiological Survey of the Portsmouth Gaseous Diffusion Plant and Surrounding Area, Portsmouth, Ohio

    SciTech Connect (OSTI)

    Namdoo Moon

    2007-12-01

    An aerial radiological survey was conducted over the 16 square-mile (~41 square-kilometer) area surrounding the Portsmouth Gaseous Diffusion Plant. The survey was performed in August 2007 utilizing a large array of helicopter mounted sodium iodide detectors. The purpose of the survey was to update the previous radiological survey levels of the environment and surrounding areas of the plant. A search for a missing radium-226 source was also performed. Implied exposure rates, man-made activity, and excess bismuth-214 activity, as calculated from the aerial data are presented in the form of isopleth maps superimposed on imagery of the surveyed area. Ground level and implied aerial exposure rates for nine specific locations are compared. Detected radioisotopes and their associated gamma ray exposure rates were consistent with those expected from normal background emitters. At specific plant locations described in the report, man-made activity was consistent with the operational histories of the location. There was no spectral activity that would indicate the presence of the lost source.

  7. IAEA Verification Experiment at the Portsmouth Gaseous Diffusion Plant: Report on the Cascade Header Enrichment Monitor

    SciTech Connect (OSTI)

    P. L. Kerr; D. A. Close; W. S. Johnson; R. M. Kandarian; C. E. Moss; C. D. Romero

    1999-03-01

    The authors describe the Cascade Header Enrichment Monitor (CHEM) for the Portsmouth Gaseous Diffusion Plant at Piketon, Ohio, and present the calibration and measurement results. The US government has offered excess fissile material that is no longer needed for defense purposes for International Atomic Energy Agency (IAEA) inspection. Measurement results provided by the CHEM were used by the IAEA in a verification experiment to provide confidence that the US successfully blended excess highly enriched uranium (HEU) down to low enriched uranium (LEU). The CHEM measured the uranium enrichment in two cascade header pipes, a 20.32-cm HEU pipe and a 7.62-cm product LEU pipe. The CHEM determines the amount of {sup 235}U from the 185.7-keV gamma-ray photopeak and the amount of total uranium by x-ray fluorescence (XRF) of the 98.4-keV x-ray from uranium with a {sup 57}Co XRF source. The ratio yields the enrichment. The CHEM consists of a collimator assembly, an electromechanically cooled germanium detector, and a rack-mounted personal computer running commercial and custom software. The CHEM was installed in December 1997 and was used by the IAEA inspectors for announced and unannounced inspections on the HEU and LEU header pipes through October 1998. The equipment was sealed with tamper-indicating enclosures when the inspectors were not present.

  8. Replacement of chlorofluorocarbons at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; McCold, L.N.; Saylor, R.E.

    1997-01-01

    Three gaseous diffusion plants (GDPs) for enriching uranium maintain a large inventory of chlorofluorocarbon-114 (CFC-114) as a coolant. To address the continued use of CFC-114, an ozone-depleting substance, the US Department of Energy (DOE) considered introducing perfluorocarbons (PFCs) by the end of 1995. These PFCs would not contribute to stratospheric ozone depletion but would be larger contributors to global warming than would CFC-114. The paper reports the results of an assessment of the global impacts of four alternatives for modifying GDP coolant system operations over a three-year period beginning in 1996. The overall contribution of GDP coolant releases to impacts on ozone depletion and global warming were quantified by parameters referred to as ozone-depletion impact and global-warming impact. The analysis showed that these parameters could be used as surrogates for predicting global impacts to all resources and could provide a framework for assessing environmental impacts of a permanent coolant replacement, eliminating the need for subsequent resource-specific analyses.

  9. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

  10. Report on the biological monitoring program at Paducah Gaseous Diffusion Plant December 1993 to December 1994

    SciTech Connect (OSTI)

    Kszos, L.A.

    1996-05-01

    On September 24, 1987, the Commonwealth of Kentucky Natural Resources and Environmental Protection Cabinet issued an Agreed Order that required the development of a Biological Monitoring Program (BMP) for the Paducah Gaseous Diffusion Plant (PGDP). The PGDP BMP was implemented in 1987 by the University of Kentucky. Research staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) served as reviewers and advisers to the University of Kentucky. Beginning in fall 1991, ESD added data collection and report preparation to its responsibilities for the PGDP BMP. The goals of BMP are to (1) demonstrate that the effluent limitations established for PGDP protect and maintain the use of Little Bayou and Big Bayou creeks for growth and propagation of fish and other aquatic life, (2) characterize potential environmental impacts, (3) document the effects of pollution abatement facilities on stream biota, and (4) recommend any program improvements that would increase effluent treatability. In September 1992, a renewed Kentucky Pollutant Discharge Elimination System (KPDES) permit was issued to PGDP. The BMP for PGDP consists of three major tasks: (1) effluent and ambient toxicity monitoring, (2) bioaccumulation studies, and (3) ecological surveys of stream communities (i.e., benthic macroinvertebrates and fish). This report includes ESD activities occurring from December 1993 to December 1994, although activities conducted outside this time period are included as appropriate.

  11. Report on the biological monitoring program at Paducah Gaseous Diffusion Plant, January--December 1996

    SciTech Connect (OSTI)

    Kszos, L.A.; Konetsky, B.K.; Peterson, M.J.; Petrie, R.B.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.

    1997-06-01

    On September 24, 1987, the Commonwealth of Kentucky Natural Resources and Environmental Protection Cabinet issued an Agreed Order that required the development of a Biological Monitoring Program (BMP) for the Paducah Gaseous diffusion Plant (PGDP). The PGDP BMP was conducted by the University of Kentucky Between 1987 and 1992 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 to present. The goals of BMP are to (1) demonstrate that the effluent limitations established for PGDP protect and maintain the use of Little Bayou and Big Bayou creeks for growth and propagation of fish and other aquatic life, (2) characterize potential environmental impacts, and (3) document the effects of pollution abatement facilities on stream. The BMP for PGDP consists of three major tasks: (1) effluent toxicity monitoring, (2) bioaccumulation studies, and (3) ecological surveys of stream communities (i.e., benthic macroinvertebrates and fish). This report focuses on ESD activities occurring from January 1996 to December 1996, although activities conducted outside this time period are included as appropriate.

  12. Report on the biological monitoring program at Paducah Gaseous Diffusion Plant, January--December 1997

    SciTech Connect (OSTI)

    Kszos, L.A.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.

    1998-03-01

    On September 24, 1987, the Commonwealth of Kentucky Natural Resources and Environmental Protection Cabinet issued an Agreed Order that required the development of a Biological Monitoring Program (BMP) for the Paducah Gaseous Diffusion Plant (PGDP). A plan for the biological monitoring of the receiving streams was implemented in 1987 and consisted of ecological surveys, toxicity monitoring of effluents and receiving streams, evaluation of bioaccumulation of trace contaminants in biota, and supplemental chemical characterization of effluents. Beginning in fall 1991, the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory added data collection and report preparation to its responsibilities for the PGDP BMP. The BMP has been continued because it has proven to be extremely valuable in (1) identifying those effluents with the potential for adversely affecting instream fauna, (2) assessing the ecological health of receiving streams, and (3) guiding plans for remediation and protecting human health. The BMP for PGDP consists of three major tasks: (1) effluent toxicity monitoring, (2) bioaccumulation studies, and (3) ecological surveys of benthic macroinvertebrate communities and fish. With the exception of the benthic macroinvertebrate community surveys, this report focuses on activities from January to December 1997.

  13. Paducah Gaseous Diffusion Plant proposed pilot pump-and-treat project. Final report

    SciTech Connect (OSTI)

    Bodenstein, G.W.; Bonczek, R.R.; Early, T.O.; Huff, D.D.; Jones, K.S.; Nickelson, M.D.; Rightmire, C.T.

    1994-01-01

    On March 23, 1992, R.C. Sleeman of the Department of Energy, Oak Ridge Operations Office requested that a Groundwater Corrective Actions Team be assembled to evaluate the technical merit of and the need to implement a proposed groundwater pump-and-treat demonstration project for the Northwest contaminant plume at the Paducah Gaseous Diffusion Plant. In addition to other suggestions, the Team recommended that further characterization data be obtained for the plume. In the Fall of 1993 additional, temporary well points were installed so that groundwater samples from the shallow groundwater system and the Regional Gravel Aquifer (RGA) could be obtained to provide a three-dimensional view of groundwater contamination in the region of the plume. The results indicate that pure-phase DNAPL (trichloroethylene [TCE]) probably are present in the source area of the plume and extend in depth to the base of the RGA. Because the DNAPL likely will represent a source of a dissolved phase plume for decades it is essential that source containment take place. The Team recommends that although effective hydraulic containment can be achieved, other alternatives should be considered. For example, recent advances in emplacing low permeability barrier walls to depths of 100 to 150 ft make it possible to consider encirclement of the source of the Northwest plume.

  14. Determination of operating limits for radionuclides for a proposed landfill at Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Wang, J.C.; Lee, D.W.; Ketelle, R.H.; Lee, R.R.; Kocher, D.C.

    1994-05-24

    The operating limits for radionuclides in sanitary and industrial wastes were determined for a proposed landfill at the Paducah Gaseous Diffusion Plant (PGDP), Kentucky. These limits, which may be very small but nonzero, are not mandated by law or regulation but are needed for rational operation. The approach was based on analyses of the potential contamination of groundwater at the plant boundary and the potential exposure to radioactivity of an intruder at the landfill after closure. The groundwater analysis includes (1) a source model describing the disposal of waste and the release of radionuclides from waste to the groundwater, (2) site-specific groundwater flow and contaminant transport calculations, and (3) calculations of operating limits from the dose limit and conversion factors. The intruder analysis includes pathways through ingestion of contaminated vegetables and soil, external exposure to contaminated soil, and inhalation of suspended activity from contaminated soil particles. In both analyses, a limit on annual effective dose equivalent of 4 mrem (0.04 mSv) was adopted. The intended application of the results is to refine the radiological monitoring standards employed by the PGDP Health Physics personnel to determine what constitutes radioactive wastes, with concurrence of the Commonwealth of Kentucky.

  15. Operating limit study for the proposed solid waste landfill at Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Lee, D.W.; Wang, J.C.; Kocher, D.C.

    1995-06-01

    A proposed solid waste landfill at Paducah Gaseous Diffusion Plant (PGDP) would accept wastes generated during normal operations that are identified as non-radioactive. These wastes may include small amounts of radioactive material from incidental contamination during plant operations. A site-specific analysis of the new solid waste landfill is presented to determine a proposed operating limit that will allow for waste disposal operations to occur such that protection of public health and the environment from the presence of incidentally contaminated waste materials can be assured. Performance objectives for disposal were defined from existing regulatory guidance to establish reasonable dose limits for protection of public health and the environment. Waste concentration limits were determined consistent with these performance objectives for the protection of off-site individuals and inadvertent intruders who might be directly exposed to disposed wastes. Exposures of off-site individuals were estimated using a conservative, site-specific model of the groundwater transport of contamination from the wastes. Direct intrusion was analyzed using an agricultural homesteader scenario. The most limiting concentrations from direct intrusion or groundwater transport were used to establish the concentration limits for radionuclides likely to be present in PGDP wastes.

  16. Uranium hexafluoride packaging tiedown systems overview at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio. Revision 1

    SciTech Connect (OSTI)

    Becker, D.L.; Green, D.J.; Lindquist, M.R.

    1993-07-01

    The Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio, is operated by Martin Marietta Energy Systems, Inc., through the US Department of Energy-Oak Ridge Operations Office (DOE-ORO) for the US Department of Energy-Headquarters, Office of Nuclear Energy. The PORTS conducts those operations that are necessary for the production, packaging, and shipment of uranium hexafluoride (UF{sub 6}). Uranium hexafluoride enriched uranium than 1.0 wt percent {sup 235}U shall be packaged in accordance with the US Department of Transportation (DOT) regulations of Title 49 CFR Parts 173 (Reference 1) and 178 (Reference 2), or in US Nuclear Regulatory Commission (NRC) or US Department of Energy (DOE) certified package designs. Concerns have been expressed regarding the various tiedown methods and condition of the trailers being used by some shippers/carriers for international transport of the UF{sub 6} cylinders/overpacks. Because of the concerns about international shipments, the US Department of Energy-Headquarters (DOE-HQ) Office of Nuclear Energy, through DOE-HQ Transportation Management Division, requested Westinghouse Hanford Company (Westinghouse Hanford) to review UF{sub 6} packaging tiedown and shipping practices used by PORTS, and where possible and appropriate, provide recommendations for enhancing these practices. Consequently, a team of two individuals from Westinghouse Hanford visited PORTS on March 5 and 6, 1990, for the purpose of conducting this review. The paper provides a brief discussion of the review activities and a summary of the resulting findings and recommendations. A detailed reporting of the is documented in Reference 4.

  17. Evaluation of aqueous degreasers versus chlorinated solvents at the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Gunn, D.

    1988-10-31

    Spent chlorinated solvents are produced mainly as a result of degreasing operations at several Paducah Gaseous Diffusion Plant (PGDP) locations. This waste is a listed hazardous waste under Resource Conservation and Recovery Act (RCRA) regulations (40 CFR 261). In addition, some of the solvents become contaminated with uranium which classifies the waste as a mixed waste for which no disposal method is currently available. Due to health and environmental concerns and the desire to minimize mixed and hazardous waste generation, degreasing operations in the plant were delineated and alternate nonhazardous solvents were evaluated for their suitability for replacing the chlorinated solvents. Metal cleanliness testing of eight aqueous degreasers using ultrasonic cleaning and immersion with agitation, and vapor degreasing with trichloroethylene (TCE) and 1,1,1-trichloroethane (TC-ane) was performed. Soils such as dust, fingerprints, lube oil, water-soluble oil, silicone grease, and petroleum-based grease were removed from Monel, copper, mild steel, aluminum, and phosphor bronze. Cleanliness was determined by estimating the surface energy of metal coupons before and after cleaning. A Kepner-Tregoe (KT) decision analysis was utilized to determine the three best multipurpose degreasers for the plant. Additional testing was performed on the top three selected degreasers to evaluate corrosive effects of the cleaning solutions (general surface corrosion and pitting), and to determine the compatability of any residual contamination with process gases. Corrosion testing was performed in an electrochemical corrosion tester. Cleaned coupons were exposed to uranium hexafluoride, fluorine, and chlorine trifluoride. In addition, metal cleanliness testing was conducted to evaluate the cleaning efficiency of parts cleaned in the field.

  18. Proposed sale of radioactively contaminated nickel ingots located at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    1995-10-01

    The U.S. Department of Energy (DOE) proposes to sell 8,500 radioactively contaminated nickel ingots (9.350 short tons), currently in open storage at the Paducah Gaseous Diffusion Plant (PGDP), to Scientific Ecology Group, Inc. (SEG) for decontamination and resale on the international market. SEG would take ownership of the ingots when they are loaded for transport by truck to its facility in Oak Ridge, Tennessee. SEG would receive approximately 200 short tons per month over approximately 48 months (an average of 180 ingots per month). The nickel decontamination process specified in SEG`s technical proposal is considered the best available technology and has been demonstrated in prototype at SEG. The resultant metal for resale would have contamination levels between 0.3 and 20 becquerel per gram (Bq/g). The health hazards associated with release of the decontaminated nickel are minimal. The activity concentration of the end product would be further reduced when the nickel is combined with other metals to make stainless steel. Low-level radioactive waste from the SEG decontamination process, estimated to be approximately 382 m{sup 3} (12,730 ft), would be shipped to a licensed commercial or DOE disposal facility. If the waste were packaged in 0.23 m{sup 3}-(7.5 ft{sup 3}-) capacity drums, approximately 1,500 to 1,900 drums would be transported over the 48-month contract period. Impacts from the construction of decontamination facilities and the selected site are minimal.

  19. Inorganic soil and groundwater chemistry near Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    Moore, G.K.

    1995-03-01

    Near-surface soils, boreholes, and sediments near the Paducah Gaseous Diffusion Plant (PGDP) were sampled in 1989-91 as were monitoring wells, TVA wells, and privately-owned wells. Most wells were sampled two or three times. The resulting chemical analyses have been published in previous reports and have been previously described (CH2M HILL 1991, 1992; Clausen et al. 1992). The two reports by CH2M HILL are controversial, however, because, the concentrations of some constituents were reported to exceed background levels or drinking water standards and because both on-site (within the perimeter fence at PGDP) and off-site pollution was reported to have occurred. The groundwater samples upon which these interpretations were based may not be representative, however. The CH2M HILL findings are discussed in the report. The purpose of this report is to characterize the inorganic chemistry of groundwater and soils near PGDP, using data from the CH2M HILL reports (1991, 1992), and to determine whether or not any contamination has occurred. The scope is limited to analysis and interpretation of data in the CH2M HILL reports because previous interpretations of these data may not be valid, because samples were collected in a relatively short period of time at several hundred locations, and because the chemical analyses are nearly complete. Recent water samples from the same wells were not considered because the characterization of inorganic chemistry for groundwater and soil requirements only one representative sample and an accurate analysis from each location.

  20. Ground penetrating radar surveys over an alluvial DNAPL site, Paducah Gaseous Diffusion Plant, Kentucky

    SciTech Connect (OSTI)

    Carpenter, P.J. |; Doll, W.E.; Phillips, B.E.

    1994-09-01

    Ground penetrating radar (GPR) surveys were used to map shallow sands and gravels which are DNAPL migration pathways at the Paducah Gaseous Diffusion Plant in western Kentucky. The sands and gravels occur as paleochannel deposits, at depths of 17-25 ft, embedded in Pleistocene lacustrine clays. More than 30 GPR profiles were completed over the Drop Test Area (DTA) to map the top and base of the paleochannel deposits, and to assess their lateral continuity. A bistatic radar system was used with antenna frequencies of 25 and 50 MHz. An average velocity of 0.25 ft/ns for silty and clayey materials above the paleochannel deposits was established from radar walkaway tests, profiles over culverts of known depth, and comparison of radar sections with borings. In the south portion of the DTA, strong reflections corresponded to the water table at approximately 9-10 ft, the top of the paleochannel deposits at approximately 18 ft, and to gravel horizons within these deposits. The base of these deposits was not visible on the radar sections. Depth estimates for the top of the paleochannel deposits (from 50 records) were accurate to within 2 ft across the southern portion of the DTA. Continuity of these sands and gravels could not be assessed due to interference from air-wave reflections and lateral changes in signal penetration depth. However, the sands and gravels appear to extend across the entire southern portion of the DTA, at depths as shallow as 17 ft. Ringing, air-wave reflections and diffractions from powerlines, vehicles, well casings, and metal equipment severly degraded GPR profiles in the northern portion of the DTA; depths computed from reflection times (where visible) were accurate to within 4 ft in this area. The paleochannel deposits are deeper to the north and northeast where DNAPL has apparently pooled (DNAPL was not directly imaged by the GPR, however). Existing hydrogeological models of the DTA will be revised.

  1. Uranium hexafluoride packaging tiedown systems overview at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    SciTech Connect (OSTI)

    Becker, D.L.; Lindquist, M.R.

    1993-03-01

    The Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio operated by Martin Marietta Energy Systems, Inc., through the US Department of Energy-Oak Ridge Operations Office (DOE-ORO) for the US Department of Energy Headquarters, Office of Nuclear Energy. The PORTS conducts those operations that are necessary for the production, packaging, and shipment of enriched uranium hexafluoride (UF[sub 6]). Uranium hexafluoride enriched greater than 1.0 wt percent [sup 235]U shall be packaged in accordance with the US Department of Transportation (DOT) regulations of Title 49 CFR Parts 173 (Reference 1) and 178 (Reference 2), or in US Nuclear Regulatory Commission (NRC) or US Department of Energy (DOE) certified package designs. Concerns have been expressed regarding the various tiedown methods and condition of the trailers being used by some shippers/carriers for international transport of the UF[sub 6] cylinders/overpacks (Reference 3). Because of the concerns about international shipments, the US Department of Energy-Headquarters (DOE-HQ) Office of Nuclear Energy, through DOE-HQ Transportation Management Division, requested Westinghouse Hanford Company (Westinghouse Hanford) to review UF[sub 6] packaging tiedown and shipping practices used by PORTS, and where possible and appropriate, provide recommendations for enhancing these practices. Consequently, a tram of two individuals from Westinghouse Hanford visited PORTS on March 5 and 6, 1990, for the purpose of conducting this review. The paper provides a brief discussion of the review activities and a summary of the resulting findings and recommendations. A detailed reporting of the review is documented in Reference 4.

  2. Uranium hexafluoride packaging tiedown systems overview at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    SciTech Connect (OSTI)

    Becker, D.L.; Lindquist, M.R.

    1993-03-01

    The Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio operated by Martin Marietta Energy Systems, Inc., through the US Department of Energy-Oak Ridge Operations Office (DOE-ORO) for the US Department of Energy Headquarters, Office of Nuclear Energy. The PORTS conducts those operations that are necessary for the production, packaging, and shipment of enriched uranium hexafluoride (UF{sub 6}). Uranium hexafluoride enriched greater than 1.0 wt percent {sup 235}U shall be packaged in accordance with the US Department of Transportation (DOT) regulations of Title 49 CFR Parts 173 (Reference 1) and 178 (Reference 2), or in US Nuclear Regulatory Commission (NRC) or US Department of Energy (DOE) certified package designs. Concerns have been expressed regarding the various tiedown methods and condition of the trailers being used by some shippers/carriers for international transport of the UF{sub 6} cylinders/overpacks (Reference 3). Because of the concerns about international shipments, the US Department of Energy-Headquarters (DOE-HQ) Office of Nuclear Energy, through DOE-HQ Transportation Management Division, requested Westinghouse Hanford Company (Westinghouse Hanford) to review UF{sub 6} packaging tiedown and shipping practices used by PORTS, and where possible and appropriate, provide recommendations for enhancing these practices. Consequently, a tram of two individuals from Westinghouse Hanford visited PORTS on March 5 and 6, 1990, for the purpose of conducting this review. The paper provides a brief discussion of the review activities and a summary of the resulting findings and recommendations. A detailed reporting of the review is documented in Reference 4.

  3. RCRA Facility Investigation Plan K-1004 Area Lab Drain and the K-1007-B Pond - Oak Ridge Gaseous Diffusion Plant - Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    ORGDP, Martin Marietta Energy Systems Inc.

    1988-12-01

    Within the confines of the Oak Ridge Gaseous Diffusion Plant (ORGDP) are hazardous waste treatment, storage, and disposal facilities; some are in operation while others are no longer in use. these solid waste management units (SWMUs) are subject to assessment by the US Environmental Protection Agency (EPA). The RCRA Facility Investigation (RFI) Plans are scheduled to be submitted for all units during calendar years 1987 and 1988. The RFI Plan - General Document (K/HS-132) includes information applicable to all the ORGDP SMWUs and serves as a reference document for the site-specific RFI plans. This document is the site-specific RFI Plan for the K-1004 Area Lab Drain (ALD) and the K-1007-B Pond. This plan is based upon requirements described in the draft document, RFI Guidance, Vols. I-IV, December 1987 (EPA 530/SW-87-001). This unit is regulated by Section 3004(u) of the 1984 Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation Recovery Act (RCRA). Contained within this document are geographical, historical, operational, geological, and hydrological data specific to the K-1004 ALD and the K-1007-B Pond. The potential for release of contamination through the various media to receptors is addressed. A sampling plan is proposed to further determine the extent (if any) of release of contamination to the surrounding environment. Included are health and safety procedures to be followed when implementing the sampling plan. Quality control (QC) procedures for remedial action occurring on the Oak Ridge Reservation (ORR) are presented in 'The Environmental Surveillance Procedures Quality Control Program, Martin Marietta Energy Systems, Inc., (ESH/Sub/87-21706/1), and quality assurance (QA) guidelines for ORGDP investigations are contained in The K-25 Remedial Actions Program Quality Assurance Plan, K/HS-231.

  4. Second report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect (OSTI)

    Smith, J.G.; Adams, S.M.; Hinzman, R.L.; Kszos, L.A.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Southworth, G.R.; Crumby, W.D.

    1994-03-01

    On September 11, 1986, a modified National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site), a former uranium-enrichment production facility. As required in Part III of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed for the biological monitoring of Mitchell Branch (K-1700 stream) and submitted for approval to the US EPA and the Tennessee Department of Environment and Conservation. The plan described biomonitoring activities that would be conducted over the duration of the permit. The objectives of the BMAP are to demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life, and to document the effects on stream biota resulting from operation of major new pollution abatement facilities. The BMAP consists of four tasks: ambient toxicity testing; bioaccumulation studies; biological indicator studies; and ecological surveys of stream communities, including benthic macroinvertebrates and fish. This document is the second in a series of reports presenting the results of the studies that were conducted over various periods of time between August 1987 and June 1990.

  5. Recommendation 167: Historic Preservation of the K-25 Building

    Broader source: Energy.gov [DOE]

    The OSSAB Recommendation to DOE on Historic Preservation of the K-25 Building at East Tennessee Technology Park.

  6. K-25: Historic Preservation Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    K-25: Historic Preservation Agreement K-25: Historic Preservation Agreement Addthis Description In a ceremony attended by representatives of federal, state, and local historic preservation groups, the U.S. Department of Energy announced the formal completion of an agreement that will preserve the historic contributions of Oak Ridge's K-25 site to the World War II Manhattan Project. In this video, Oak Ridge Historian Bill Wilcox explores the contributions the K-25 project gave to our country and

  7. Health risk from earthquake caused releases of UF{sub 6} at the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Brown, N.W; Lu, S.; Chen, J.C.; Roehnelt, R.; Lombardi, D.

    1998-05-01

    The health risk to the public and workers from potential exposure to the toxic materials from earthquake caused releases of uranium hexafluoride from the Paducah gaseous Diffusion Plant are evaluated. The results of the study show that the health risk from earthquake caused releases is small, and probably less than risks associated with the transportation of hydrogen fluoride and other similar chemicals used by industry. The probability of more than 30 people experiencing health consequences (injuries) from earthquake damage is less than 4xlO{sup 4}/yr.

  8. APPLICATION OF THE LASAGNA{trademark} SOIL REMEDIATION TECHNOLOGY AT THE DOE PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Swift, Barry D.; Tarantino, Joseph J., P. E.

    2003-02-27

    The Paducah Gaseous Diffusion Plant (PGDP), owned by the Department of Energy (DOE), has been enriching uranium since the early 1950s. The enrichment process involves electrical and mechanical components that require periodic cleaning. The primary cleaning agent was trichloroethene (TCE) until the late 1980s. Historical documentation indicates that a mixture of TCE and dry ice were used at PGDP for testing the integrity of steel cylinders, which stored depleted uranium. TCE and dry ice were contained in a below-ground pit and used during the integrity testing. TCE seeped from the pit and contaminated the surrounding soil. The Lasagna{trademark} technology was identified in the Record of Decision (ROD) as the selected alternative for remediation of the cylinder testing site. A public-private consortium formed in 1992 (including DOE, the U.S. Environmental Protection Agency, and the Kentucky Department for Environmental Protection, Monsanto, DuPont, and General Electric) developed the Lasagna{trademark} technology. This innovative technology employs electrokinetics to remediate soil contaminated with organics and is especially suited to sites with low permeability soils. This technology uses direct current to move water through the soil faster and more uniformly than hydraulic methods. Electrokinetics moves contaminants in soil pore water through treatment zones comprised of iron filings, where the contaminants are decomposed to basic chemical compounds such as ethane. After three years of development in the laboratory, the consortium field tested the Lasagna{trademark} process in several phases. CDM installed and operated Phase I, the trial installation and field test of a 150-square-foot area selected for a 120-day run in 1995. Approximately 98 percent of the TCE was removed. CDM then installed and operated the next phase (IIa), a year-long test on a 600-square-foot site. Completed in July 1997, this test removed 75 percent of the total volume of TCE down to a

  9. Community celebrates K-25 historic preservation agreement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Community celebrates K-25 historic preservation agreement Community celebrates K-25 historic preservation agreement August 10, 2012 - 12:00pm Addthis Oak Ridge, TN - In a ceremony attended by representatives of federal, state, and local historic preservation groups, the U.S. Department of Energy (DOE) announced the formal completion of an agreement that will preserve the historic contributions of Oak Ridge's K-25 site to the World War II Manhattan Project. Mark Whitney, the DOE's new

  10. Recommendation 196: Alternatives to Memorialize the K-25 Building

    Broader source: Energy.gov [DOE]

    The ORSSAB Recommends to DOE Alternatives to Memorialize the K-25 Building at East Tennessee Technology Park and Manhattan Project Exhibits in Oak Ridge, Tennessee.

  11. Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

    SciTech Connect (OSTI)

    Cusick, Lesley T.

    2013-07-01

    When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge

  12. Natural phenomena evaluations of the K-25 site UF{sub 6} cylinder storage yards

    SciTech Connect (OSTI)

    Fricke, K.E.

    1996-09-15

    The K-25 Site UF{sub 6} cylinder storage yards are used for the temporary storage of UF{sub 6} normal assay cylinders and long-term storage of other UF{sub 6} cylinders. The K-25 Site UF{sub 6} cylinder storage yards consist of six on-site areas: K-1066-B, K-1066-E, K-1066-F, K-1066-J, K-1066-K and K-1066-L. There are no permanent structures erected on the cylinder yards, except for five portable buildings. The operating contractor for the K-25 Site is preparing a Safety Analysis Report (SAR) to examine the safety related aspects of the K-25 Site UF{sub 6} cylinder storage yards. The SAR preparation encompasses many tasks terminating in consequence analysis for the release of gaseous and liquid UF{sub 6}, one of which is the evaluation of natural phenomena threats, such as earthquakes, floods, and winds. In support of the SAR, the six active cylinder storage yards were evaluated for vulnerabilities to natural phenomena, earthquakes, high winds and tornados, tornado-generated missiles, floods (local and regional), and lightning. This report summarizes those studies. 30 refs.

  13. Gamma radiological surveys of the Oak Ridge Reservation, Paducah Gaseous Diffusion Plant, and Portsmouth Gaseous Diffusion Plant, 1990-1993, and overview of data processing and analysis by the Environmental Restoration Remote Sensing Program, Fiscal Year 1995

    SciTech Connect (OSTI)

    Smyre, J.L.; Moll, B.W.; King, A.L.

    1996-06-01

    Three gamma radiological surveys have been conducted under auspices of the ER Remote Sensing Program: (1) Oak Ridge Reservation (ORR) (1992), (2) Clinch River (1992), and (3) Portsmouth Gaseous Diffusion Plant (PORTS) (1993). In addition, the Remote Sensing Program has acquired the results of earlier surveys at Paducah Gaseous Diffusion Plant (PGDP) (1990) and PORTS (1990). These radiological surveys provide data for characterization and long-term monitoring of U.S. Department of Energy (DOE) contamination areas since many of the radioactive materials processed or handled on the ORR, PGDP, and PORTS are direct gamma radiation emitters or have gamma emitting daughter radionuclides. High resolution airborne gamma radiation surveys require a helicopter outfitted with one or two detector pods, a computer-based data acquisition system, and an accurate navigational positioning system for relating collected data to ground location. Sensors measure the ground-level gamma energy spectrum in the 38 to 3,026 KeV range. Analysis can provide gamma emission strength in counts per second for either gross or total man-made gamma emissions. Gross count gamma radiation includes natural background radiation from terrestrial sources (radionuclides present in small amounts in the earth`s soil and bedrock), from radon gas, and from cosmic rays from outer space as well as radiation from man-made radionuclides. Man-made count gamma data include only the portion of the gross count that can be directly attributed to gamma rays from man-made radionuclides. Interpretation of the gamma energy spectra can make possible the determination of which specific radioisotopes contribute to the observed man-made gamma radiation, either as direct or as indirect (i.e., daughter) gamma energy from specific radionuclides (e.g., cesium-137, cobalt-60, uranium-238).

  14. An interim report to the manager of the Paducah Gaseous Diffusion Plant from the Paducah Environmental Advisory Committee

    SciTech Connect (OSTI)

    Jackson, G.D.

    1987-10-01

    The Paducah Environmental Advisory Committee was formed as: (1) an outgrowth of other Environmental Advisory Committees already in existence at Oak Ridge and other Martin Marietta Energy Systems plants; (2) a result of public concern following significant nuclear incidents at Bhopal and Chernobyl; (3) a result of the new direction and commitment of the management of the Paducah Gaseous Diffusion Plant following contract acquisition by Martin Marietta Energy Systems; and (4) a means of reducing and/or preventing local and/or public concern regarding the activities of and potential risks created by PGDP. This report discusses the following issues and concerns of the Committee arrived at through a series of meetings: (1) groundwater monitoring; (2) long-range tails storage; C-404, scrap yrads, and PCB and TCE cleanup; nuclear criticality plan and alarm systems; documentation of historical data regarding hazardous waste burial grounds; dosimeter badges; and asbestos handling and removal.

  15. The Mailbox Computer System for the IAEA verification experiment on HEU downlending at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Aronson, A.L.; Gordon, D.M.

    2000-07-31

    IN APRIL 1996, THE UNITED STATES (US) ADDED THE PORTSMOUTH GASEOUS DIFFUSION PLANT TO THE LIST OF FACILITIES ELIGIBLE FOR THE APPLICATION OF INTERNATIONAL ATOMIC ENERGY AGENCY (IAEA) SAFEGUARDS. AT THAT TIME, THE US PROPOSED THAT THE IAEA CARRY OUT A ''VERIFICATION EXPERIMENT'' AT THE PLANT WITH RESPECT TO DOOWNBLENDING OF ABOUT 13 METRIC TONS OF HIGHLY ENRICHED URANIUM (HEU) IN THE FORM OF URANIUM HEXAFLUROIDE (UF6). DURING THE PERIOD DECEMBER 1997 THROUGH JULY 1998, THE IAEA CARRIED OUT THE REQUESTED VERIFICATION EXPERIMENT. THE VERIFICATION APPROACH USED FOR THIS EXPERIMENT INCLUDED, AMONG OTHER MEASURES, THE ENTRY OF PROCESS-OPERATIONAL DATA BY THE FACILITY OPERATOR ON A NEAR-REAL-TIME BASIS INTO A ''MAILBOX'' COMPUTER LOCATED WITHIN A TAMPER-INDICATING ENCLOSURE SEALED BY THE IAEA.

  16. In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Rasmussen B.

    2010-01-01

    This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO{sub 2}F{sub 2} deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO{sub 2}F{sub 2} deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO{sub 2}F{sub 2} source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO{sub 2}F{sub 2} deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25

  17. Dispersion of UO{sub 2}F{sub 2} aerosol and HF vapor in the operating floor during winter ventilation at the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Kim, S.H.; Chen, N.C.J.; Taleyarkhan, R.P.; Keith, K.D.; Schmidt, R.W.; Carter, J.C.

    1996-12-30

    The gaseous diffusion process is currently employed at two plants in the US: the Paducah Gaseous Diffusion Plant and the Portsmouth Gaseous Diffusion Plant. As part of a facility-wide safety evaluation, a postulated design basis accident involving large line-rupture induced releases of uranium hexafluoride (UF{sub 6}) into the process building of a gaseous diffusion plant (GDP) is evaluated. When UF{sub 6} is released into the atmosphere, it undergoes an exothermic chemical reaction with moisture (H{sub 2}O) in the air to form vaporized hydrogen fluoride (HF) and aerosolized uranyl fluoride (UO{sub 2}F{sub 2}). These reactants disperse in the process building and transport through the building ventilation system. The ventilation system draws outside air into the process building, distributes it evenly throughout the building, and discharges it to the atmosphere at an elevated temperature. Since air is recirculated from the cell floor area to the operating floor, issues concerning in-building worker safety and evacuation need to be addressed. Therefore, the objective of this study is to evaluate the transport of HF vapor and UO{sub 2}F{sub 2} aerosols throughout the operating floor area following B-line break accident in the cell floor area.

  18. Type B Accident Investigation of the August 22, 2000, Injury Resulting From Violent Exothermic Chemical Reaction at the Portsmouth Gaseous Diffusion Plant, X-701B Site

    Broader source: Energy.gov [DOE]

    On August 22, 2000, an accident occurred at the U. S. Department of Energy (DOE) Portsmouth Gaseous Diffusion Plant (PORTS) located in Piketon, Ohio. An employee of the IT Corporation (IT) working on an Environmental Management (EM) Technology Deployment Project received serious burns from a violent chemical reaction.

  19. Demolition Begins at K-25's Last Section Standing | Department...

    Office of Environmental Management (EM)

    ... When K-25 was operational, the NaF traps were part of the final uranium removal process. Sodium fluoride pellets were used to trap the uranium, and these particular traps still ...

  20. DOE Issues Final Request for Proposal for Portsmouth Gaseous...

    Energy Savers [EERE]

    Portsmouth Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services December 9, 2014 - 3:37pm Addthis ...

  1. Prediction of external corrosion for steel cylinders at the Paducah Gaseous Diffusion Plant: Application of an empirical method

    SciTech Connect (OSTI)

    Lyon, B.F.

    1996-02-01

    During the summer of 1995, ultrasonic wall thickness data were collected for 100 steel cylinders containing depleted uranium (DU) hexafluoride located at Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The cylinders were selected for measurement to assess the condition of the more vulnerable portion of the cylinder inventory at PGDP. The purpose of this report is to apply the method used in Lyon to estimate the effects of corrosion for larger unsampled populations as a function of time. The scope of this report is limited and is not intended to represent the final analyses of available data. Future efforts will include continuing analyses of available data to investigate defensible deviations from the conservative assumptions made to date. For each cylinder population considered, two basic types of analyses were conducted: (1) estimates were made of the number of cylinders as a function of time that will have a minimum wall thickness of either 0 mils (1 mil = 0.00 1 in.) or 250 mils and (2) the current minimum wall thickness distributions across cylinders were estimated for each cylinder population considered. Additional analyses were also performed investigating comparisons of the results for F and G yards with the results presented in Lyon (1995).

  2. Determination of the response function for the Portsmouth Gaseous Diffusion Plant criticality accident alarm system neutron detectors

    SciTech Connect (OSTI)

    Tayloe, R.W. Jr.; Brown, A.S.; Dobelbower, M.C.; Woollard, J.E.

    1997-03-01

    Neutron-sensitive radiation detectors are used in the Portsmouth Gaseous Diffusion Plant`s (PORTS) criticality accident alarm system (CAAS). The CAAS is composed of numerous detectors, electronics, and logic units. It uses a telemetry system to sound building evacuation horns and to provide remote alarm status in a central control facility. The ANSI Standard for a CAAS uses a free-in-air dose rate to define the detection criteria for a minimum accident-of-concern. Previously, the free-in-air absorbed dose rate from neutrons was used for determining the areal coverge of criticality detection within PORTS buildings handling fissile materials. However, the free-in-air dose rate does not accurately reflect the response of the neutron detectors in use at PORTS. Because the cost of placing additional CAAS detectors in areas of questionable coverage (based on a free-in-air absorbed dose rate) is high, the actual response function for the CAAS neutron detectors was determined. This report, which is organized into three major sections, discusses how the actual response function for the PORTS CAAS neutron detectors was determined. The CAAS neutron detectors are described in Section 2. The model of the detector system developed to facilitate calculation of the response function is discussed in Section 3. The results of the calculations, including confirmatory measurements with neutron sources, are given in Section 4.

  3. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This report is part A of Volume 3 concerning characterization, decontamination, and dismantlement.

  4. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates envirorunental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. This volume, Volume 2, contains logic diagrams with an index. Volume 3 has been divided into two separate volumes to facilitate handling and use.

  5. K-25 West Wing Demolition Completed | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    West Wing Demolition Completed K-25 West Wing Demolition Completed January 28, 2010 - 12:00pm Addthis OAK RIDGE, Tenn. - Thirteen months after demolition began, the final unit of the K-25 Building West Wing was taken down on January 20. Demolition of the 844,000 square foot structure began on December 16, 2008. A significant amount of debris remains to be size-reduced and shipped to the Environmental Management Waste Management Facility (EMWMF) in Oak Ridge, but demolition of the wing is

  6. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers, McCracken County, Kentucky

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers, McCracken County, Kentucky U.S. Department of Energy Portsmouth/Paducah Project Office December 2015 DOE/EA-1927 ACRONYMS AND ABBREVIATIONS CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act of 1980 CFR Code of Federal Regulations dBA A-weighted decibel DOE U.S. Department of Energy DUF 6 depleted uranium hexafluoride EA

  7. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. This Volume, Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume is divided into ten chapters. The first chapter is a brief introduction, and the second chapter details the technical approach of the TLD. These categories are the work activities necessary for successful decontamination and decommissioning, waste management, and remedial action of the K-25 Site. The categories are characterization, decontamination, dismantlement, robotics and automation, remedial action, and waste management. Materials disposition is addressed in Chap. 9. The final chapter contains regulatory compliance information concerning waste management, remedial action, and decontamination and decommissioning.

  8. Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Finds Ways to Remove K-25 Faster, Cheaper Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper February 1, 2012 - 12:00pm Addthis Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper ...

  9. Environmental site description for a Uranium Atomic Vapor Laser Isotope Separation (U-AVLIS) production plant at the Portsmouth Gaseous Diffusion Plant site

    SciTech Connect (OSTI)

    Marmer, G.J.; Dunn, C.P.; Filley, T.H.; Moeller, K.L.; Pfingston, J.M.; Policastro, A.J.; Cleland, J.H.

    1991-09-01

    Uranium enrichment in the United States has utilized a diffusion process to preferentially enrich the U-235 isotope in the uranium product. In the 1970s, the US Department of Energy (DOE) began investigating more efficient and cost-effective enrichment technologies. In January 1990, the Secretary of Energy approved a plan for the demonstration and deployment of the Uranium Atomic Vapor Laser isotope Separation (U-AVLIS) technology with the near-term goal to provide the necessary information to make a deployment decision by November 1992. Initial facility operation is anticipated for 1999. A programmatic document for use in screening DOE sites to locate a U-AVLIS production plant was developed and implemented in two parts. The first part consisted of a series of screening analyses, based on exclusionary and other criteria, that identified a reasonable number of candidate sites. The final evaluation, which included sensitivity studies, identified the Oak Ridge Gaseous Diffusion Plant (ORGDP) site, the Paducah Gaseous Diffusion Plant (PGDP) site, and the Portsmouth Gaseous Diffusion Plant (PORTS) site as having significant advantages over the other sites considered. This environmental site description (ESD) provides a detailed description of the PORTS site and vicinity suitable for use in an environmental impact statement (EIS). This report is based on existing literature, data collected at the site, and information collected by Argonne National Laboratory (ANL) staff during site visits. The organization of the ESD is as follows. Topics addressed in Sec. 2 include a general site description and the disciplines of geology, water resources, biotic resources, air resources, noise, cultural resources, land use. Socioeconomics, and waste management. Identification of any additional data that would be required for an EIS is presented in Sec. 3.

  10. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

  11. TECHNICAL EVALUATION OF TEMPORAL GROUNDWATER MONITORING VARIABILITY IN MW66 AND NEARBY WELLS, PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.

    2012-08-28

    Evaluation of disposal records, soil data, and spatial/temporal groundwater data from the Paducah Gaseous Diffusion Plant (PGDP) Solid Waste Management Unit (SWMU) 7 indicate that the peak contaminant concentrations measured in monitoring well (MW) 66 result from the influence of the regional PGDP NW Plume, and does not support the presence of significant vertical transport from local contaminant sources in SWMU 7. This updated evaluation supports the 2006 conceptualization which suggested the high and low concentrations in MW66 represent different flow conditions (i.e., local versus regional influences). Incorporation of the additional lines of evidence from data collected since 2006 provide the basis to link high contaminant concentrations in MW66 (peaks) to the regional 'Northwest Plume' and to the upgradient source, specifically, the C400 Building Area. The conceptual model was further refined to demonstrate that groundwater and the various contaminant plumes respond to complex site conditions in predictable ways. This type of conceptualization bounds the expected system behavior and supports development of environmental cleanup strategies, providing a basis to support decisions even if it is not feasible to completely characterize all of the 'complexities' present in the system. We recommend that the site carefully consider the potential impacts to groundwater and contaminant plume migration as they plan and implement onsite production operations, remediation efforts, and reconfiguration activities. For example, this conceptual model suggests that rerouting drainage water, constructing ponds or basin, reconfiguring cooling water systems, capping sites, decommissioning buildings, fixing (or not fixing) water leaks, and other similar actions will potentially have a 'direct' impact on the groundwater contaminant plumes. Our conclusion that the peak concentrations in MW66 are linked to the regional PGDP NW Plume does not imply that there TCE is not present in SWMU

  12. Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Rigsby V.P.

    2009-02-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab

  13. Department of Energy Begins Demolition on K-25's East Wing -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Begins Demolition on K-25's East Wing - Moves closer to completing Oak Ridge's largest cleanup project Department of Energy Begins Demolition on K-25's East Wing - Moves closer to...

  14. Final load of debris shipped from K-25 Building demolition project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    load of debris shipped from K-25 Building demolition project Final load of debris shipped from K-25 Building demolition project March 11, 2014 - 3:00pm Addthis The last shipment of ...

  15. Demolition begins on K-25's North End | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demolition begins on K-25's North End Demolition begins on K-25's North End October 24, 2012 - 12:00pm Addthis Oak Ridge, Tenn. - Oak Ridge's EM contractor URS | CH2M Oak Ridge, ...

  16. Commemorating the Historical Contributions of the K-25 Site in Tennessee |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Commemorating the Historical Contributions of the K-25 Site in Tennessee Commemorating the Historical Contributions of the K-25 Site in Tennessee September 21, 2012 - 10:14am Addthis The 44-acre K-25 superstructure made significant historical contributions during its years of operation. | Photo credit Oak Ridge Office photographer Lynn Freeny. The 44-acre K-25 superstructure made significant historical contributions during its years of operation. | Photo credit Oak Ridge

  17. Oak Ridge EM Program Completes K-25 North End Demolition | Department of

    Energy Savers [EERE]

    Site | Department of Energy Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site August 1, 2012 - 12:00pm Addthis Workers near completion of the non-technetium area of K-25’s east wing (left). Oak Ridge anticipates beginning demolition on the North Tower (right) by October. Workers near completion of the non-technetium area of K-25's east wing (left). Oak Ridge anticipates beginning demolition

  18. Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program

    SciTech Connect (OSTI)

    Etnier, E.L.; Eaton, L.A.

    1992-03-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

  19. Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance

    SciTech Connect (OSTI)

    Etnier, E.L.; Eaton, L.A. )

    1992-03-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms applicable'' and relevant and appropriate'' is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

  20. Field evaluation of a horizontal well recirculation system for groundwater treatment: Field demonstration at X-701B Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    SciTech Connect (OSTI)

    Korte, N.; Muck, M.; Kearl, P.; Siegrist, R.; Schlosser, R.; Zutman, J.; Houk, T.

    1998-08-01

    This report describes the field-scale demonstration performed as part of the project, In Situ Treatment of Mixed Contaminants in Groundwater. This project was a 3{1/2} year effort comprised of laboratory work performed at Oak Ridge National Laboratory and fieldwork performed at the US Department of Energy (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). The overall goal of the project was to evaluate in situ treatment of groundwater using horizontal recirculation coupled with treatment modules. Specifically, horizontal recirculation was tested because of its application to thin, interbedded aquifer zones. Mixed contaminants were targeted because of their prominence at DOE sites and because they cannot be treated with conventional methods. The project involved several research elements, including treatment process evaluation, hydrodynamic flow and transport modeling, pilot testing at an uncontaminated site, and full-scale testing at a contaminated site. This report presents the results of the work at the contaminated site, X-701B at PORTS. Groundwater contamination at X-701B consists of trichloroethene (TCE) (concentrations up to 1800 mg/L) and technetium-998 (Tc{sup 99}) (activities up to 926 pCi/L).

  1. Verification experiment on the downblending of high enriched uranium (HEU) at the Portsmouth Gaseous Diffusion Plant. Digital video surveillance of the HEU feed stations

    SciTech Connect (OSTI)

    Martinez, R.L.; Tolk, K.; Whiting, N.; Castleberry, K.; Lenarduzzi, R.

    1998-08-01

    As part of a Safeguards Agreement between the US and the International Atomic Energy Agency (IAEA), the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio, was added to the list of facilities eligible for the application of IAEA safeguards. Currently, the facility is in the process of downblending excess inventory of HEU to low enriched uranium (LEU) from US defense related programs for commercial use. An agreement was reached between the US and the IAEA that would allow the IAEA to conduct an independent verification experiment at the Portsmouth facility, resulting in the confirmation that the HEU was in fact downblended. The experiment provided an opportunity for the DOE laboratories to recommend solutions/measures for new IAEA safeguards applications. One of the measures recommended by Sandia National Laboratories (SNL), and selected by the IAEA, was a digital video surveillance system for monitoring activity at the HEU feed stations. This paper describes the SNL implementation of the digital video system and its integration with the Load Cell Based Weighing System (LCBWS) from Oak Ridge National Laboratory (ORNL). The implementation was based on commercially available technology that also satisfied IAEA criteria for tamper protection and data authentication. The core of the Portsmouth digital video surveillance system was based on two Digital Camera Modules (DMC-14) from Neumann Consultants, Germany.

  2. Thermal discharges from Paducah Gaseous Diffusion Plant outfalls: Impacts on stream temperatures and fauna of Little Bayou and Big Bayou Creeks

    SciTech Connect (OSTI)

    Roy, W.K.; Ryon, M.G.; Hinzman, R.L.

    1996-03-01

    The development of a biological monitoring plan for the receiving streams of the Paducah Gaseous Diffusion Plant (PGDP) began in the late 1980s, because of an Agreed Order (AO) issued in September 1987 by the Kentucky Division of Water (KDOW). Five years later, in September 1992, more stringent effluent limitations were imposed upon the PGDP operations when the KDOW reissued Kentucky Pollutant Discharge Elimination System permit No. KY 0004049. This action prompted the US Department of Energy (DOE) to request a stay of certain limits contained in the permit. An AO is being negotiated between KDOW, the US Enrichment Corporation (USEC), and DOE that will require that several studies be conducted, including this stream temperature evaluation study, in an effort to establish permit limitations. All issues associated with this AO have been resolved, and the AO is currently being signed by all parties involved. The proposed effluent temperature limit is 89 F (31.7 C) as a mean monthly temperature. In the interim, temperatures are not to exceed 95 F (35 C) as a monthly mean or 100 F (37.8 C) as a daily maximum. This study includes detailed monitoring of instream temperatures, benthic macroinvertebrate communities, fish communities, and a laboratory study of thermal tolerances.

  3. Application of the electromagnetic borehole flowmeter and evaluation of previous pumping tests at Paducah Gaseous Diffusion Plant. Final report, June 15, 1992--August 31, 1992

    SciTech Connect (OSTI)

    Young, S.C.; Julian, S.C.; Neton, M.J.

    1993-01-01

    Multi-well pumping tests have been concluded at wells MW79, MW108, and PW1 at the Paducah Gaseous Diffusion Plant (PGDP) to determine the hydraulic properties of the Regional Gravel Aquifer (RGA). Soil cores suggest that the RGA consists of a thin sandy facies (2 to 6 feet) at the top of a thicker (> 10 feet) gravelly facies. Previous analyses have not considered any permeability contrast between the two facies. To assess the accuracy of this assumption, TVA personnel conducted borehole flowmeter tests at wells MW108 and PW1. Well MW79 could not be tested. The high K sand unit is probably 10 times more permeable than comparable zone in the gravelly portion of the RGA. Previous analyses of the three multi-well aquifer tests do not use the same conceptual aquifer model. Data analysis for one pumping test assumed that leakance was significant. Data analysis for another pumping test assumed that a geologic boundary was significant. By collectively analyzing all three tests with the borehole flowmeter results, the inconsistency among the three pumping tests can be explained. Disparity exists because each pumping test had a different placement of observation wells relative to the high K zone delineating by flowmeter testing.

  4. Thermal Discharges from Paducah Gaseous Diffusion Plant Outfalls: Impacts on Stream Temperatures and Fauna of Little Bayou and Big Bayou Creeks

    SciTech Connect (OSTI)

    Roy, W.K.

    1999-01-01

    The development of a biological monitoring plan for the receiving streams of the Paducah Gaseous Diffusion Plant (PGDP) began in the late 1980s, because of an Agreed Order (AO) issued in September 1987 by the Kentucky Division of Water (KDOW). Five years later, in September 1992, more stringent effluent limitations were imposed upon the PGDP operations when the KDOW reissued Kentucky Pollutant Discharge Elimination System permit No. KY 0004049. This action prompted the US Department of Energy (DOE) to request a stay of certain limits contained in the permit. An AO is being negotiated between KDOW, the United States Enrichment Corporation (USEC), and DOE that will require that several studies be conducted, including this stream temperature evaluation study, in an effort to establish permit limitations. All issues associated with this AO have been resolved, and the AO is currently being signed by all parties involved. The proposed effluent temperature limit is 89 F (31.7C) as a mean monthly temperature. In the interim, temperatures are not to exceed 95 F (35 C) as a monthly mean or 100 F (37.8 C) as a daily maximum. This study includes detailed monitoring of instream temperatures, benthic macroinvertebrate communities, fish communities, and a laboratory study of thermal tolerances.

  5. Assessment of the influences of groundwater colloids on the migration of technetium-99 at the Paducah Gaseous Diffusion Plant Site in Paducah, Kentucky

    SciTech Connect (OSTI)

    Gu, B.; McDonald, J.A.; McCarthy, J.F.; Clausen, J.L.

    1994-07-01

    This short report summarizes the influences of groundwater colloids on the migration/transport of {sup 99}Tc at the Paducah Gaseous Diffusion Plant (PGDP) site in Paducah, Kentucky. Limited data suggest that inorganic colloidal materials (e.g., aluminosilicate clay minerals) may not play a significant role in the retention and transport of Tc. Studies by size fractionation reveal that both Tc and natural organic matter (NOM) are largely present in the <3K fraction. The role of NOM on Tc retention and transport is not conclusive on the basis of this study. However, a literature review suggests that Tc is very likely associated with the groundwater organics. The presence of the organic matter could have increased the solubility and cotransport of Tc at the PGDP site. Further studies, applying such techniques as gel chromatography, size exclusion, and spectroscopy, may be useful to determine the association of organic matter with Tc. If Tc is associated with groundwater organics, appropriate protocols for removal of organic matter associated with Tc may be developed. Time and resources were limited so this study is not comprehensive with respect to the role of mobile organic and inorganic colloidal materials on Tc transport in subsurface soils. The redox conditions (DO) of groundwaters reported may not represent the true groundwater conditions, which could have influenced the association and dissociation of Tc with groundwater colloidal materials. Because Tc concentrations in the groundwater (on the order of nCi/L) at the PGDP site is much lower than the solubility of reduced Tc (IV) (on the order of {approximately}10{sup {minus}8} mol/L or parts per billion), regardless of the redox conditions, Tc will stay in solution phase as TC(IV) or Tc(VII). The mechanisms of adsorption/association vs precipitation must be understood under reduced and low Tc conditions so that strategic plans for remediation of Tc contaminated soils and groundwaters can be developed.

  6. Paducah Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers.

  7. 1993 annual report of hazardous waste activities for the Oak Ridge K-25 site

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report is a detailed listing of all of the Hazardous Waste activities occurring at Martin Marietta`s K-25 site. Contained herein are hazardous waste notification forms, waste stream reports, generator fee forms and various TSDR reports.

  8. High-Risk Components Removed from K-25’s Tc-99 Area

    Broader source: Energy.gov [DOE]

    Oak Ridge's EM program removes one of the highest risk components remaining in K-25 building with the successful crane removal of five components known as NaF traps.

  9. Dose Modeling Evaluations and Technical Support Document For the Authorized Limits Request for the DOE-Owned Property Outside the Limited Area, Paducah Gaseous Diffusion Plant Paducah, Kentucky

    SciTech Connect (OSTI)

    Boerner, A. J.; Maldonado, D. G.; Hansen, Tom

    2012-09-01

    Environmental assessments and remediation activities are being conducted by the U.S. Department of Energy (DOE) at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky. The Oak Ridge Institute for Science and Education (ORISE), a DOE prime contractor, was contracted by the DOE Portsmouth/Paducah Project Office (DOE-PPPO) to conduct radiation dose modeling analyses and derive single radionuclide soil guidelines (soil guidelines) in support of the derivation of Authorized Limits (ALs) for 'DOE-Owned Property Outside the Limited Area' ('Property') at the PGDP. The ORISE evaluation specifically included the area identified by DOE restricted area postings (public use access restrictions) and areas licensed by DOE to the West Kentucky Wildlife Management Area (WKWMA). The licensed areas are available without restriction to the general public for a variety of (primarily) recreational uses. Relevant receptors impacting current and reasonably anticipated future use activities were evaluated. In support of soil guideline derivation, a Conceptual Site Model (CSM) was developed. The CSM listed radiation and contamination sources, release mechanisms, transport media, representative exposure pathways from residual radioactivity, and a total of three receptors (under present and future use scenarios). Plausible receptors included a Resident Farmer, Recreational User, and Wildlife Worker. single radionuclide soil guidelines (outputs specified by the software modeling code) were generated for three receptors and thirteen targeted radionuclides. These soil guidelines were based on satisfying the project dose constraints. For comparison, soil guidelines applicable to the basic radiation public dose limit of 100 mrem/yr were generated. Single radionuclide soil guidelines from the most limiting (restrictive) receptor based on a target dose constraint of 25 mrem/yr were then rounded and identified as the derived soil guidelines. An additional evaluation using the derived soil

  10. A TECHNICAL ASSESSMENT OF THE CURRENT WATER POLICY BOUNDARY AT U.S. DEPARTMENT OF ENERGY, PADUCAH GASEOUS DIFFUSION PLANT, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    2012-12-13

    In 1988, groundwater contaminated with trichloroethene (TCE) and technetium-99 (Tc-99) was identified in samples collected from residential water wells withdrawing groundwater from the Regional Gravel Aquifer (RGA) north of the Paducah Gaseous Diffusion Plant (PGDP) facility. In response, the U.S. Department of Energy (DOE) provided temporary drinking water supplies to approximately 100 potentially affected residents by initially supplying bottled water, water tanks, and water-treatment systems, and then by extending municipal water lines, all at no cost, to those persons whose wells could be affected by contaminated groundwater. The Water Policy boundary was established in 1993. In the Policy, DOE agreed to pay the reasonable monthly cost of water for homes and businesses and, in exchange, many of the land owners signed license agreements committing to cease using the groundwater via rural water wells. In 2012, DOE requested that Oak Ridge Associated Universities (ORAU), managing contractor of Oak Ridge Institute for Science and Education (ORISE), provide an independent assessment of the quality and quantity of the existing groundwater monitoring data and determine if there is sufficient information to support a modification to the boundary of the current Water Policy. As a result of the assessment, ORAU concludes that sufficient groundwater monitoring data exists to determine that a shrinkage and/or shift of the plume(s) responsible for the initial development of this policy has occurred. Specifically, there is compelling evidence that the TCE plume is undergoing shrinkage due to natural attenuation and associated degradation. The plume shrinkage (and migration) has also been augmented in local areas where large volumes of groundwater were recovered by pump-and treat remedial systems along the eastern and western boundaries of the Northwest Plume, and in other areas where pump-and-treat systems have been deployed by DOE to remove source contaminants. The

  11. ENZYME ACTIVITY PROBE AND GEOCHEMICAL ASSESSMENT FOR POTENTIAL AEROBIC COMETABOLISM OF TRICHLOROETHENE IN GROUNDWATER OF THE NORTHWEST PLUME, PADUCAH GASEOUS DIFFUSION PLANT, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B; M. Hope Lee, M; S. K. Hampson, S

    2008-06-27

    The overarching objective of the Paducah Gaseous Diffusion Plant (PGDP) enzyme activity probe (EAP) effort is to determine if aerobic cometabolism is contributing to the attenuation of trichloroethene (TCE) and other chlorinated solvents in the contaminated groundwater beneath PGDP. The site-specific objective for the EAP assessment is to identify if key metabolic pathways are present and expressed in the microbial community--namely the pathways that are responsible for degradation of methane and aromatic (e.g. toluene, benzene, phenol) substrates. The enzymes produced to degrade methane and aromatic compounds also break down TCE through a process known as cometabolism. EAPs directly measure if methane and/or aromatic enzyme production pathways are operating and, for the aromatic pathways, provide an estimate of the number of active organisms in the sampled groundwater. This study in the groundwater plumes at PGDP is a major part of a larger scientific effort being conducted by Interstate Technology and Regulatory Council (ITRC), U.S. Department of Energy (DOE) Office of Environmental Management (EM), Savannah River National Laboratory (SRNL), and North Wind Inc. in which EAPs are being applied to contaminated groundwater from diverse hydrogeologic and plume settings throughout the U.S. to help standardize their application as well as their interpretation. While EAP data provide key information to support the site specific objective for PGDP, several additional lines of evidence are being evaluated to increase confidence in the determination of the occurrence of biodegradation and the rate and sustainability of aerobic cometabolism. These complementary efforts include: (1) Examination of plume flowpaths and comparison of TCE behavior to 'conservative' tracers in the plume (e.g., {sup 99}Tc); (2) Evaluation of geochemical conditions throughout the plume; and (3) Evaluation of stable isotopes in the contaminants and their daughter products throughout the plume. If

  12. LED ADOPTION REPORT | Department of Energy

    Energy Savers [EERE]

    » Signature Facilities » K-25 Gaseous Diffusion Process Building K-25 Gaseous Diffusion Process Building K-25 Gaseous Diffusion Process Building New! K-25 Virtual Museum The K-25 plant, located on the southwestern end of the Oak Ridge reservation, used the gaseous diffusion method to separate uranium-235 from uranium-238. Based on the well-known principle that molecules of a lighter isotope would pass through a porous barrier more readily than molecules of a heavier one, gaseous diffusion

  13. K. D. Makwana, P. W. Terry, J.-H. Kim, and D. R. Hatch

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    » Signature Facilities » K-25 Gaseous Diffusion Process Building K-25 Gaseous Diffusion Process Building K-25 Gaseous Diffusion Process Building New! K-25 Virtual Museum The K-25 plant, located on the southwestern end of the Oak Ridge reservation, used the gaseous diffusion method to separate uranium-235 from uranium-238. Based on the well-known principle that molecules of a lighter isotope would pass through a porous barrier more readily than molecules of a heavier one, gaseous diffusion

  14. Energy Department Extends Contract for Cleanup of Portsmouth Gaseous

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diffusion Plant | Department of Energy Extends Contract for Cleanup of Portsmouth Gaseous Diffusion Plant Energy Department Extends Contract for Cleanup of Portsmouth Gaseous Diffusion Plant March 28, 2016 - 9:00pm Addthis Media Contact Brad Mitzelfelt, 859-219-4035 brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy (DOE) today announced that it has exercised its option to extend the contract for decontamination and decommissioning (D&D) of the Portsmouth Gaseous

  15. Oak Ridge K-25 Site Technology Logic Diagram. Volume 2, Technology Logic Diagrams

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates envirorunental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. This volume, Volume 2, contains logic diagrams with an index. Volume 3 has been divided into two separate volumes to facilitate handling and use.

  16. Process for producing enriched uranium having a {sup 235}U content of at least 4 wt. % via combination of a gaseous diffusion process and an atomic vapor laser isotope separation process to eliminate uranium hexafluoride tails storage

    DOE Patents [OSTI]

    Horton, J.A.; Hayden, H.W. Jr.

    1995-05-30

    An uranium enrichment process capable of producing an enriched uranium, having a {sup 235}U content greater than about 4 wt. %, is disclosed which will consume less energy and produce metallic uranium tails having a lower {sup 235}U content than the tails normally produced in a gaseous diffusion separation process and, therefore, eliminate UF{sub 6} tails storage and sharply reduce fluorine use. The uranium enrichment process comprises feeding metallic uranium into an atomic vapor laser isotope separation process to produce an enriched metallic uranium isotopic mixture having a {sup 235} U content of at least about 2 wt. % and a metallic uranium residue containing from about 0.1 wt. % to about 0.2 wt. % {sup 235} U; fluorinating this enriched metallic uranium isotopic mixture to form UF{sub 6}; processing the resultant isotopic mixture of UF{sub 6} in a gaseous diffusion process to produce a final enriched uranium product having a {sup 235}U content of at least 4 wt. %, and up to 93.5 wt. % or higher, of the total uranium content of the product, and a low {sup 235}U content UF{sub 6} having a {sup 235}U content of about 0.71 wt. % of the total uranium content of the low {sup 235}U content UF{sub 6}; and converting this low {sup 235}U content UF{sub 6} to metallic uranium for recycle to the atomic vapor laser isotope separation process. 4 figs.

  17. Process for producing enriched uranium having a .sup.235 U content of at least 4 wt. % via combination of a gaseous diffusion process and an atomic vapor laser isotope separation process to eliminate uranium hexafluoride tails storage

    DOE Patents [OSTI]

    Horton, James A.; Hayden, Jr., Howard W.

    1995-01-01

    An uranium enrichment process capable of producing an enriched uranium, having a .sup.235 U content greater than about 4 wt. %, is disclosed which will consume less energy and produce metallic uranium tails having a lower .sup.235 U content than the tails normally produced in a gaseous diffusion separation process and, therefore, eliminate UF.sub.6 tails storage and sharply reduce fluorine use. The uranium enrichment process comprises feeding metallic uranium into an atomic vapor laser isotope separation process to produce an enriched metallic uranium isotopic mixture having a .sup.235 U content of at least about 2 wt. % and a metallic uranium residue containing from about 0.1 wt. % to about 0.2 wt. % .sup.235 U; fluorinating this enriched metallic uranium isotopic mixture to form UF.sub.6 ; processing the resultant isotopic mixture of UF.sub.6 in a gaseous diffusion process to produce a final enriched uranium product having a .sup.235 U content of at least 4 wt. %, and up to 93.5 wt. % or higher, of the total uranium content of the product, and a low .sup.235 U content UF.sub.6 having a .sup.235 U content of about 0.71 wt. % of the total uranium content of the low .sup.235 U content UF.sub.6 ; and converting this low .sup.235 U content UF.sub.6 to metallic uranium for recycle to the atomic vapor laser isotope separation process.

  18. DOE Begins Demoltion on K-25’s East Wing

    Broader source: Energy.gov [DOE]

    DOE begins demolition of Building K-25’s east wing. The former uranium enrichment facility, located at ETTP, was once the world’s largest building under one roof, covering more than 44 acres. The project is one of DOE’s highest EM priorities in Oak Ridge and an integral component to completing cleanup of ETTP.

  19. Oak Ridge K-25 Site Technology Logic Diagram. Volume 1, Technology evaluation

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. This Volume, Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume is divided into ten chapters. The first chapter is a brief introduction, and the second chapter details the technical approach of the TLD. These categories are the work activities necessary for successful decontamination and decommissioning, waste management, and remedial action of the K-25 Site. The categories are characterization, decontamination, dismantlement, robotics and automation, remedial action, and waste management. Materials disposition is addressed in Chap. 9. The final chapter contains regulatory compliance information concerning waste management, remedial action, and decontamination and decommissioning.

  20. Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Representatives from federal, state, and local historic preservation groups gathered earlier this month to celebrate the formal completion of an agreement that preserves the historic contributions of Oak Ridge’s K-25 site to the Manhattan Project and Cold War.

  1. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    SciTech Connect (OSTI)

    Kszos, L.A.; Adams, S.M.; Ashwood, T.L.; Blaylock, B.G.; Greeley, M.S.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Hinzman, R.L.; Shoemaker, B.A.

    1993-04-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP is based on results of biological monitoring conducted from 1986 to 1992 and discussions held on November 12, 1992, between staff of Martin Marietta Energy Systems, Inc. (Oak Ridge National Laboratory and the K-25 Site), and the Tennessee Department of Environment and Conservation, Department of Energy Oversight Division. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions.

  2. IAEA workshop and field trial at the Oak Ridge K-25 Site

    SciTech Connect (OSTI)

    Hembree, D.M. Jr.; Ross, H.H.; Carter, J.A.

    1995-03-01

    In March 1994, members of the International Safeguards Department in the National Security Program Office (NSPO) hosted an environmental monitoring field trial workshop for International Atomic Energy Agency (IAEA) inspectors. The workshop was held at the Oak Ridge K-25 Site and its primary purpose was to train the inspectors in the techniques needed for effective environmental sample collection and handling. The workshop emphasized both sampling theory and practice. First, detailed techniques for swipe, vegetation, soil, biota, and water-associated sampling were covered in the classroom. Subsequently, the inspectors were divided into three groups for actual sample collection in and around the K-25 locale. The collected samples were processed by the Department of Energy (DOE) Network of Analytical Laboratories using established analytical techniques. This activity is part of the IAEA ``Programme 93+2 in. assessment of measures to enhance IAEA safeguards.

  3. Vitrification demonstration with surrogate Oak Ridge Reservation K-25 B and C pond sludge

    SciTech Connect (OSTI)

    Cicero, C.A.; Overcamp, T.J.; Erich, D.L.

    1996-07-01

    Surrogate Oak Ridge Reservation (ORR) K-25 B&C Pond sludge was vitrified in a pilot-scale EnVit Co melter operated by Clemson University at the DOE/Industrial Center for Vitrification Research Center. This demonstration was performed for the Savannah River Technology Center (SRTC) in support of a Department of Energy (DOE) - Office of Technology Development (OTD) Technical Task Plan. The intent of the demonstration was to determine the feasibility of vitrifying actual K-25 B&C Pond sludge in an EnVitCo type melter. B&C Pond sludge is a mixed waste consisting primarily of various amounts of Ca, Fe, and Si, with Ni and U as the principal hazardous and radioactive components. The demonstration was successfully completed and homogeneous, durable glass was produced. Characterization of the glass product, as well as details of the demonstration, will be discussed.

  4. Impact of NDA Uncertainites on NCS at the K-25 Site

    SciTech Connect (OSTI)

    Kevin Kimball , Ian Gauld

    2008-05-29

    The K-25 Building at the East Tennessee Technology Park is relying on the use of Non-Destructive Assay (NDA) methods for characterizing hold-up materials in process equipment. The characterization data is used for many purposes including mass estimates for nuclear criticality safety (NCS) and waste disposition. This paper addresses the sensitivity of certain parameters in the NDA process to overall mass measurement results.

  5. Routine environmental audit of the K-25 Site, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report documents the results of the Routine Environmental Audit of the K-25 Site in Oak Ridge, Tennessee, conducted February 14 through February 25, 1994, by the US Department of Energy`s (DOE`s) Office of Environmental Audit (EH-24) located within the Office of Environment, Safety and Health (EH). The Routine Environmental Audit for the K-25 site was conducted as an environmental management assessment, supported through reviews of the Waste Management Program and the Decontamination and Decommissioning Program. The assessment was conducted jointly with, and built upon, the results provided by the ``DOE Oak Ridge Operations Office Environment, Safety, health and Quality Assurance Appraisal at the K-25 Site.`` DOE 5482.1B, ``Environment, Safety and Health Appraisal Program,`` established the mission of EH-24 to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The purpose of this assessment is to provide the Secretary of Energy and senior DOE managers with concise independent information as part of DOE`s continuing effort to improve environmental program performance. The ultimate goal of EH-24 is enhancement of environmental protection and the minimization of risk to public health and the environment. The routine environmental audit is one method by which EH-24 accomplishes its mission, utilizing systematic and periodic evaluations of the Department`s environmental programs within line organizations.

  6. Energy Department Selects Deactivation Contractor for Paducah Gaseous

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diffusion Plant | Department of Energy Deactivation Contractor for Paducah Gaseous Diffusion Plant Energy Department Selects Deactivation Contractor for Paducah Gaseous Diffusion Plant July 22, 2014 - 5:48pm Addthis News Media Contact Brad Mitzelfelt, (859) 219-4035, brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy (DOE) today awarded a Task Order under the Nationwide Environmental Management ID/IQ Unrestricted Contract to Fluor Federal Services, Inc. for

  7. Pollution prevention opportunity assessment for the K-25 Site Steam Plant -- Level 3

    SciTech Connect (OSTI)

    1995-09-01

    A Level 3 pollution prevention opportunity assessment (PPOA) was performed for the K-1501 Steam Plant at the K-25 Site. The primary objective was to identify and evaluate pollution prevention (P2) options to reduce the quantities of each waste stream generated by the Steam Plant. For each of the waste streams, P2 options were evaluated to first reduce the quantity of waste generated and second to recycle the waste. This report provides a process description of the facility; identification, evaluation, and recommendations of P2 options; an implementation schedule with funding sources; and conclusions. Largely for economic reasons, only 3 of the 14 P2 options are being recommended for implementation. All are source reduction options. When implemented, these three options are estimated to reduce the annual generation of waste by 658,412 kg and will result in a cost savings of approximately $29,232/year for the K-25 Site. The recommended options are to: install a flue gas return System in Boiler 7; reduce steam loss from traps; and increase lapse time between rinses. The four boilers currently in operation at the Steam Plant use natural gas or fuel oil as fuel sources.

  8. Environmental site description for a Uranium Atomic Vapor Laser Isotope Separation (U-AVLIS) production plant at the Paducah Gaseous Diffusion Plant site

    SciTech Connect (OSTI)

    Marmer, G.J.; Dunn, C.P.; Moeller, K.L.; Pfingston, J.M.; Policastro, A.J.; Yuen, C.R.; Cleland, J.H.

    1991-09-01

    Uranium enrichment in the United States has utilized a diffusion process to preferentially enrich the U-235 isotope in the uranium product. The U-AVLIS process is based on electrostatic extraction of photoionized U-235 atoms from an atomic vapor stream created by electron-beam vaporization of uranium metal alloy. The U-235 atoms are ionized when precisely tuned laser light -- of appropriate power, spectral, and temporal characteristics -- illuminates the uranium vapor and selectively photoionizes the U-235 isotope. A programmatic document for use in screening DOE site to locate a U-AVLIS production plant was developed and implemented in two parts. The first part consisted of a series of screening analyses, based on exclusionary and other criteria, that identified a reasonable number of candidate sites. These sites were subjected to a more rigorous and detailed comparative analysis for the purpose of developing a short list of reasonable alternative sites for later environmental examination. This environmental site description (ESD) provides a detailed description of the PGDP site and vicinity suitable for use in an environmental impact statement (EIS). The report is based on existing literature, data collected at the site, and information collected by Argonne National Laboratory (ANL) staff during a site visit. 65 refs., 15 tabs.

  9. Refurbishment of uranium hexafluoride cylinder storage yards C-745-K, L, M, N, and P and construction of a new uranium hexafluoride cylinder storage yard (C-745-T) at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    1996-07-01

    The Paducah Gaseous Diffusion Plant (PGDP) is a uranium enrichment facility owned by the US Department of Energy (DOE). A residual of the uranium enrichment process is depleted uranium hexafluoride (UF6). Depleted UF6, a solid at ambient temperature, is stored in 32,200 steel cylinders that hold a maximum of 14 tons each. Storage conditions are suboptimal and have resulted in accelerated corrosion of cylinders, increasing the potential for a release of hazardous substances. Consequently, the DOE is proposing refurbishment of certain existing yards and construction of a new storage yard. This environmental assessment (EA) evaluates the impacts of the proposed action and no action and considers alternate sites for the proposed new storage yard. The proposed action includes (1) renovating five existing cylinder yards; (2) constructing a new UF6 storage yard; handling and onsite transport of cylinders among existing yards to accommodate construction; and (4) after refurbishment and construction, restacking of cylinders to meet spacing and inspection requirements. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969. Therefore, DOE is issuing a Finding of No Significant Impact. Additionally, it is reported in this EA that the loss of less than one acre of wetlands at the proposed project site would not be a significant adverse impact.

  10. Evaluation of natural attenuation processes for trichloroethylene and technetium-99 in the Northeast and Northwest plumes at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    Clausen, J.L.; Sturchio, N.C.; Heraty, L.J.; Huang, L.; Abrajano,T.

    1997-11-25

    NA processes such as biodegradation, sorption, dilution dispersion, advection, and possibly sorption and diffusion are occurring in the Northeast and Northwest plumes. However, the overall biological attenuation rate for TCE within the plumes is not sufficiently rapid to utilize as remedial option. The mobility and toxicity of {sup 99}Tc is not being reduced by attenuating processes within the Northwest Plume. The current EPA position is that NA is not a viable remedial approach unless destructive processes are present or processes are active which reduce the toxicity and mobility of a contaminant. Therefore, active remediation of the dissolved phase plumes will be necessary to reduce contaminant concentrations before an NA approach could be justified at PGDP for either plume. Possible treatment methods for the reduction of dissolved phase concentrations within the plumes are pump-and-treat bioaugmentation, biostimulation, or multiple reactive barriers. Another possibility is the use of a regulatory instrument such as an Alternate Concentration Limit (ACL) petition. Biodegradation of TCE is occurring in both plumes and several hypothesis are possible to explain the apparent conflicts with some of the geochemical data. The first hypothesis is active intrinsic bioremediation is negligible or so slow to be nonmeasurable. In this scenario, the D.O., chloride, TCE, and isotopic results are indicative of past microbiological reactions. It is surmised in this scenario, that when the initial TCE release occurred, sufficient energy sources were available for microorganisms to drive aerobic reduction of TCE, but these energy sources were rapidly depleted. The initial degraded TCE has since migrated to downgradient locations. In the second scenario, TCE anaerobic degradation occurs in organic-rich micro-environments within a generally aerobic aquifer. TCE maybe strongly absorbed to organic-rich materials in the aquifer matrix and degraded by local Immunities of microbes

  11. EA-1927: Conveyance of Land and Facilities at the Paducah Gaseous...

    Broader source: Energy.gov (indexed) [DOE]

    Draft EA for potential land and facilities transfers at the Paducah Gaseous Diffusion Plant in McCracken County, Kentucky. OPPORTUNITES FOR PUBLIC COMMENT No public comment...

  12. Atmospheric corrosion monitoring at the US Department of Energy`s Oak Ridge K-25 Site

    SciTech Connect (OSTI)

    Rao, M.

    1995-12-31

    Depleted uranium hexafluoride (UF{sub 6}) at the US Department of Energy`s K-25 Site at Oak Ridge, TN has been stored in large steel cylinders which have undergone significant atmospheric corrosion damage over the last 35 years. A detailed experimental program to characterize and monitor the corrosion damage was initiated in 1992. Large amounts of corrosion scale and deep pits are found to cover cylinder surfaces. Ultrasonic wall thickness measurements have shown uniform corrosion losses up to 20 mils (0.5 mm) and pits up to 100 mils (2.5 mm) deep. Electrical resistance corrosion probes, time-of-wetness sensors and thermocouples have been attached to cylinder bodies. Atmospheric conditions are monitored using rain gauges, relative humidity sensors and thermocouples. Long-term (16 years) data are being obtained from mild steel corrosion coupons on test racks as well as attached directly to cylinder surfaces. Corrosion rates have been found to intimately related to the times-of-wetness, both tending to be higher on cylinder tops due to apparent sheltering effects. Data from the various tests are compared, discrepancies are discussed and a pattern of cylinder corrosion as a function of cylinder position and location is described.

  13. AEC and changes at Y-12, K-25, and X-10

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Y-12 was operating all its calutrons and improving their efficiency all along. The S-50 Thermal Diffusion Plant, built in 90 days in 1944, ran all 21 racks from March 1945 until...

  14. Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part A, Characterization, decontamination, dismantlement

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This report is part A of Volume 3 concerning characterization, decontamination, and dismantlement.

  15. INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

    2011-05-31

    The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

  16. Portsmouth Gaseous Diffusion Plant Director's Final Findings...

    Office of Environmental Management (EM)

    ... The Ohio EPA agrees, subject to the Ohio Public Records Law, ORC Section 149.43, not to release confidential budget information to any other person or entity prior to submission by ...

  17. Portsmouth Gaseous Diffusion Plant Director's Final Findings...

    Office of Environmental Management (EM)

    3745-59- 50. * Establish milestones and target dates for approved STP. ESTABLISHING ... federal fiscal years. * Non-enforceable target dates will be established for the ...

  18. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    The contractor at PORTS is Fluor-Babcock & Wilcox Portsmouth (FBP). The HSS Office of Safety and Emergency Management Evaluations performed the onsite portion of the Independent ...

  19. Portsmouth Gaseous Diffusion Plant Director's Final Findings...

    Office of Environmental Management (EM)

    water monitoring and surveillance and maintenance activities Parties DOE; Bechtel Jacobs ... water monitoring and surveillance and maintenance activities at PORTS. * Recognize that a ...

  20. NGPL Production, Gaseous Equivalent

    U.S. Energy Information Administration (EIA) Indexed Site

    NGPL Production, Gaseous Equivalent Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 View History U.S. 148,450 139,621 157,047 151,450 160,290 156,305 1973-2016

  1. Particulate and Gaseous Emissions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Gaseous Emissions - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  2. GASEOUS DISPOSAL PROCESS

    DOE Patents [OSTI]

    Ryan, R.F.; Thomasson, F.R.; Hicks, J.H.

    1963-01-22

    A method is described of removing gaseous radioactive Xe and Kr from water containing O. The method consists in stripping the gases from the water stream by means of H flowing countercurrently to the stream. The gases are then heated in a deoxo bed to remove O. The carrier gas is next cooled and passed over a charcoal adsorbent bed maintained at a temperature of about --280 deg F to remove the Xe and Kr. (AEC)

  3. NGPL Production, Gaseous Equivalent

    Gasoline and Diesel Fuel Update (EIA)

    NGPL Production, Gaseous Equivalent Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 View History U.S. 148,450 139,621 157,047 151,450 160,290 156,305 1973-2016

    Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 2010 2011 2012

  4. Pollution prevention opportunity assessment for the K-25 Site Toxic Substances Control Act Incinerator Operations, Level III

    SciTech Connect (OSTI)

    1995-09-01

    A Level III pollution prevention opportunity assessment (PPOA) was performed for the Oak Ridge K-25 Site Toxic Substances Control Act (TSCA) Incinerator to evaluate pollution prevention (P2) options for various waste streams: The main objective of this study was to identify and evaluate options to reduce the quantities of each waste stream generated by the TSCA Incinerator operations to realize significant environmental and/or economic benefits from P2. For each of the waste streams, P2 options were evaluated following the US Environmental Protection Agency (EPA) hierarchy to (1) reduce the quantity of waste generated, (2) recycle the waste, and/or (3) use alternate waste treatment or segregation methods. This report provides process descriptions, identification and evaluation of P2 options, and final recommendations.

  5. Y-12's first Open House-September 2-3, 1967, part 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    site, K-25 was assigned to the Gaseous Diffusion Plant, and S-50 was assigned to the Thermal Diffusion Plant. The only designation that might have some connection may be K-25....

  6. Gaseous Hydrogen Delivery | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Delivery Gaseous Hydrogen Delivery Gaseous hydrogen is most commonly delivered either by trucks or through pipelines. Because gaseous hydrogen is typically produced at relatively low pressures (20-30 bar), it must be compressed prior to transport. Learn more about gaseous hydrogen compression. Trucks that haul gaseous hydrogen are called tube trailers. Gaseous hydrogen is compressed to pressures of 180 bar (~2,600 psig) or higher into long cylinders which are stacked on the trailer that the

  7. System Description for the K-25/K-27 D&D Project Polyurethane Foam Delivery System, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Boris, G.

    2008-02-21

    The Foam Delivery System used in the decontamination and decommissioning (D&D) project for the K-25/K-27 Buildings at the East Tennessee Technology Park (ETTP) is comprised of a trailer-mounted Gusmer{reg_sign} H20/35 Pro-TEC Proportioning Unit and the associated equipment to convey electrical power, air, and foam component material to the unit. This high-pressure, plural-component polyurethane foam pouring system will be used to fill process gas and non-process equipment/piping (PGE/P) within the K-25/K-27 Buildings with polyurethane foam to immobilize contaminants prior to removal. The system creates foam by mixing isocyanate and polyol resin (Resin) component materials. Currently, the project plans to utilize up to six foaming units simultaneously during peak foaming activities. Also included in this system description are the foam component material storage containers that will be used for storage of the component material drums in a staging area outside of the K-25/K-27 Buildings. The Foam Delivery System and foam component material storage enclosures (i.e., Foaming Component Protective Enclosures) used to store polymeric methylene diphenyl diisocyanate (PMDI) component material are identified as Safety Significant (SS) Structures, Systems and Components (SSC) in the Documented Safety Analysis (DSA) for the project, Documented Safety Analysis for the K-25 and K-27 Facilities at the East Tennessee Technology Park, Oak Ridge, Tennessee, DSA-ET-K-25/K-27-0001.

  8. Gaseous-fuel engine technology

    SciTech Connect (OSTI)

    1995-12-31

    This publication contains three distinct groups of papers covering gaseous-fuel injection and control, gaseous-fuel engine projects, and gaseous-fuel engine/vehicle applications. Contents include: ultra rapid natural gas port injection; a CNG specific fuel injector using latching solenoid technology; development of an electronically-controlled natural gas-fueled John Deere PowerTech 8.1L engine; adapting a Geo Metro to run on natural gas using fuel-injection technology; behavior of a closed loop controlled air valve type mixer on a natural gas fueled engine under transient operation; and a turbocharged lean-burn 4.3 liter natural gas engine.

  9. Flood analyses for Department of Energy Y-12, ORNL and K-25 Plants. Flood analyses in support of flood emergency planning

    SciTech Connect (OSTI)

    1995-05-01

    The study involved defining the flood potential and local rainfall depth and duration data for the Department of Energy`s (DOE) Y-12, Oak Ridge National Laboratory (ORNL), and K-25 plants. All three plants are subject to flooding from the Clinch River. In addition, the Y-12 plant is subject to flooding from East Fork Poplar and Bear Creeks, the ORNL plant from Whiteoak Creek and Melton Branch, and the K-25 plant from Poplar Creek. Determination of flood levels included consideration of both rainfall events and postulated failures of Norris and Melton Hill Dams in seismic events.

  10. Apparatus for diffusion separation

    DOE Patents [OSTI]

    Nierenberg, William A.; Pontius, Rex B.

    1976-08-10

    1. The method of testing the separation efficiency of porous permeable membranes which comprises causing a stream of a gaseous mixture to flow into contact with one face of a finely porous permeable membrane under such conditions that a major fraction of the mixture diffuses through the membrane, maintaining a rectangular cross section of the gaseous stream so flowing past said membrane, continuously recirculating the gas that diffuses through said membrane and continuously withdrawing the gas that does not diffuse through said membrane and maintaining the volume of said recirculating gas constant by continuously introducing into said continuously recirculating gas stream a mass of gas equivalent to that which is continuously withdrawn from said gas stream and comparing the concentrations of the light component in the entering gas, the withdrawn gas and the recirculated gas in order to determine the efficiency of said membrane.

  11. Type A Accident Investigation Board Report on the February 13, 1997, Welding/Cutting Fatality at the K-33 Building, K-25 Site, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    On February 13, 1997, at approximately 11:10 a.m., a welder (referred to as “the Welder”) using a cutting torch at the K-33 Building, Oak Ridge K-25 Site, Oak Ridge Reservation, was fatally burned after being totally engulfed in flames when his anti-contamination coveralls and blue general-purpose coveralls burned.

  12. Fuel Cells and Renewable Gaseous Fuels

    Broader source: Energy.gov [DOE]

    Breakout Session 3-C: Renewable Gaseous FuelsFuel Cells and Renewable Gaseous FuelsSarah Studer, ORISE Fellow—Fuel Cell Technologies Office, U.S. Department of Energy

  13. Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part B, Remedial action, robotics/automation, waste management

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

  14. Photon detectors with gaseous amplification

    SciTech Connect (OSTI)

    Va`vra, J.

    1996-08-01

    Gaseous photon detectors, including very large 4{pi}-devices such as those incorporated in SLD and DELPHI, are finally delivering physics after many years of hard work. Photon detectors are among the most difficult devices used in physics experiments, because they must achieve high efficiency for photon transport and for the detection of single photoelectrons. Among detector builders, there is hardly anybody who did not make mistakes in this area, and who does not have a healthy respect for the problems involved. This point is stressed in this paper, and it is suggested that only a very small operating phase space is available for running gaseous photon detectors in a very large system with good efficiency and few problems. In this paper the authors discuss what was done correctly or incorrectly in first generation photon detectors, and what would be their recommendations for second generation detectors. 56 refs., 11 figs.

  15. DOE - Office of Legacy Management -- Portsmouth Gaseous Diffusion...

    Office of Legacy Management (LM)

    Primary Radioactive Materials Handled: Radiological ... was required for use commercial nuclear power plants. ... restoration and related waste management activities. ...

  16. Non-Destructive Analysis Calibration Standards for Gaseous Diffusion...

    Office of Environmental Management (EM)

    assay (NDA) of residual enriched uranium in facility components for safeguards and nuclear criticality safety purposes. Current practices used to perform NDA measurements ...

  17. Orientation Visit to the Portsmouth Gaseous Diffusion Plant

    Office of Environmental Management (EM)

    (UESA) Storage Building and Associated Outside Storage, and the DUF6 Conversion Facility. ... Lead, PPPO Nuclear Safety Oversight Lead, DUF6 Program Manager, Quality Assurance Lead, ...

  18. DOE Awards Contract for Paducah Gaseous Diffusion Plant Infrastructure...

    Energy Savers [EERE]

    The primarily firm-fixed-price nature of the contract will allow DOE to hold the ... The Paducah GDP is a Government-owned uranium enrichment plant that was constructed in the ...

  19. DOE Awards Contract for Portsmouth Gaseous Diffusion Plant Infrastruct...

    Energy Savers [EERE]

    The primarily firm-fixed-price nature of the contract will allow DOE to hold the ... the fissile isotope of uranium from natural uranium to various product concentrations. ...

  20. Community Visions for the Paducah Gaseous Diffusion Plant Site

    SciTech Connect (OSTI)

    Ormsbee, Lindell e; Kipp, James A

    2011-09-01

    This report focuses on assessing community preferences for the future use of the PGDP site, given the site's pending closure by US DOE. The project approach fostered interaction and engagement with the public based on lessons learned at other complex DOE environmental cleanup sites and upon the integration of a number of principles and approaches to public engagement from the Project Team's local, state, regional and international public engagement experience. The results of the study provide the community with a record of the diversity of values and preferences related to the environmental cleanup and future use of the site.

  1. Review of the Portsmouth Gaseous Diffusion Plant Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Pre-job briefing for Converter Sampling 25-5-2 Stage 12 at X-326 * Pre-job briefing for Overhead Crane Preventive Maintenance * Pre-job briefing for Wise Construction Pre-job B-2

  2. Paducah Gaseous Diffusion Plant Compliance Order, September 10, 1997

    Office of Environmental Management (EM)

  3. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    ... This EA uses poverty status to define low-income communities. The 2010 Census defines the poverty level in the United States as 11,369 annual income or less for an individual, and ...

  4. Paducah Gaseous Diffusion Plant Compliance Order, September 10...

    Office of Environmental Management (EM)

    approved STP and determine whether compliance dates should be modified. * Delay in performance shall be excused and no civil penalty assessed when performance is prevented or...

  5. Detector for flow abnormalities in gaseous diffusion plant compressors

    DOE Patents [OSTI]

    Smith, Stephen F.; Castleberry, Kim N.

    1998-01-01

    A detector detects a flow abnormality in a plant compressor which outputs a motor current signal. The detector includes a demodulator/lowpass filter demodulating and filtering the motor current signal producing a demodulated signal, and first, second, third and fourth bandpass filters connected to the demodulator/lowpass filter, and filtering the demodulated signal in accordance with first, second, third and fourth bandpass frequencies generating first, second, third and fourth filtered signals having first, second, third and fourth amplitudes. The detector also includes first, second, third and fourth amplitude detectors connected to the first, second, third and fourth bandpass filters respectively, and detecting the first, second, third and fourth amplitudes, and first and second adders connected to the first and fourth amplitude detectors and the second and third amplitude detectors respectively, and adding the first and fourth amplitudes and the second and third amplitudes respectively generating first and second added signals. Finally, the detector includes a comparator, connected to the first and second adders, and comparing the first and second added signals and detecting the abnormal condition in the plant compressor when the second added signal exceeds the first added signal by a predetermined value.

  6. Breached cylinder incident at the Portsmouth gaseous diffusion plant

    SciTech Connect (OSTI)

    Boelens, R.A.

    1991-12-31

    On June 16, 1990, during an inspection of valves on partially depleted product storage cylinders, a 14-ton partially depleted product cylinder was discovered breached. The cylinder had been placed in long-term storage in 1977 on the top row of Portsmouth`s (two rows high) storage area. The breach was observed when an inspector noticed a pile of green material along side of the cylinder. The breach was estimated to be approximately 8- inches wide and 16-inches long, and ran under the first stiffening ring of the cylinder. During the continuing inspection of the storage area, a second 14-ton product cylinder was discovered breached. This cylinder was stacked on the bottom row in the storage area in 1986. This breach was also located adjacent to a stiffening ring. This paper will discuss the contributing factors of the breaching of the cylinders, the immediate response, subsequent actions in support of the investigation, and corrective actions.

  7. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental...

    Energy Savers [EERE]

    ... The Tennessee Valley Authority (TVA) Shawnee Fossil Plant uses water from the Ohio River for once-through cooling. With the thermoelectric category included, about 0.1 percent of ...

  8. DOE Announces Public Tours of Paducah Gaseous Diffusion Plant site |

    Energy Savers [EERE]

    - BCS TSD comments DOE - BCS TSD comments PowerPoint slides presenting AHAM and PTI comments on technical support document. DOE - BCS TSD comments (182.68 KB) More Documents & Publications Ex Parte Meeting with DOE and Navigant Consulting on Battery Charger Energy Fact Sheet: Lithium-Ion Batteries for Stationary Energy Storage (October 2012) EV Everywhere Batteries Workshop - Beyond Lithium Ion Breakout Session Report

    DOE 1.5 Installation Time Lapse Video (Text Version) DOE 1.5

  9. Paducah Gaseous Diffusion Plant Transition | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planned the Electrical Power Reconfiguration Project design and construction. Developed the Steam Package Boiler design with equipment purchases. Completed Deactivation Project ...

  10. School science project 'demystifies' Portsmouth Gaseous Diffusion Plant

    Office of Environmental Management (EM)

    Business Technology Transfer Program Applicants | Department of Energy Schedule and Information for Small Business Innovation Research and Small Business Technology Transfer Program Applicants Schedule and Information for Small Business Innovation Research and Small Business Technology Transfer Program Applicants The funding, outreach, and award schedule for upcoming Office of Energy Efficiency and Renewable Energy (EERE) Small Business Innovation Research (SBIR) and Small Business

  11. Review of the Portsmouth Gaseous Diffusion Plant Integrated Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Independent Oversight noted that the FBP ISMS description includes the three key safety culture focus areas - leadership, employeeworker engagement, and organizational learning - ...

  12. Detector for flow abnormalities in gaseous diffusion plant compressors

    DOE Patents [OSTI]

    Smith, S.F.; Castleberry, K.N.

    1998-06-16

    A detector detects a flow abnormality in a plant compressor which outputs a motor current signal. The detector includes a demodulator/lowpass filter demodulating and filtering the motor current signal producing a demodulated signal, and first, second, third and fourth bandpass filters connected to the demodulator/lowpass filter, and filtering the demodulated signal in accordance with first, second, third and fourth bandpass frequencies generating first, second, third and fourth filtered signals having first, second, third and fourth amplitudes. The detector also includes first, second, third and fourth amplitude detectors connected to the first, second, third and fourth bandpass filters respectively, and detecting the first, second, third and fourth amplitudes, and first and second adders connected to the first and fourth amplitude detectors and the second and third amplitude detectors respectively, and adding the first and fourth amplitudes and the second and third amplitudes respectively generating first and second added signals. Finally, the detector includes a comparator, connected to the first and second adders, and comparing the first and second added signals and detecting the abnormal condition in the plant compressor when the second added signal exceeds the first added signal by a predetermined value. 6 figs.

  13. Data evaluation technical memorandum on the K-1407C Retention Basin at the Oak Ridge K-25 Site, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Beal, D.; Bock, J.; Hatmaker, T.; Zolyniak, J.; Goddard, P.; Kucsmas, D.

    1991-10-01

    The K-1407-C Retention Basin was a surface impoundment at the Oak Ridge K-25 Site. The basin was used primarily for storing potassium hydroxide scrubber sludge generated at the K-25 Site. In addition, from 1960 to 1973, metal hydroxide sludges that were removed from the K-1407-B Holding Pond were discharged to the K-1407-C Retention Basin. The sludge in the K-1407-B Pond contained discharge from the K-1420 Decontamination and Uranium Recovery, the K-1501 Steam Plant, the K-1413 Laboratory, and the K-1401 Maintenance Building. Radioactive material is also present in the K-1407-C Retention Basin, probably the result of cleaning and decontamination activities at some of the aforementioned facilities. The discharge of waste materials to K-1407-C was discontinued before November of 1988, and all sludge was removed from the retention basin. Some of the sludge was stored, and the remainder was fixed in concrete. This report is specific to the K-1407-C Retention Basin and includes information pertinent to the evaluation of soil contamination. The focus of this evaluation is the effectiveness of the Phase 1 investigation of the K-1407-C Retention Basin to define site conditions adequately to support decisions regarding appropriate closure alternatives. This includes the physical characterization of the site area and the characterization of the nature and extent of contamination at the site in relation to risk characterization and statistical evaluation.

  14. Data evaluation technical memorandum on the K-1407C Retention Basin at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Beal, D.; Bock, J.; Hatmaker, T.; Zolyniak, J.; Goddard, P. ); Kucsmas, D. )

    1991-10-01

    The K-1407-C Retention Basin was a surface impoundment at the Oak Ridge K-25 Site. The basin was used primarily for storing potassium hydroxide scrubber sludge generated at the K-25 Site. In addition, from 1960 to 1973, metal hydroxide sludges that were removed from the K-1407-B Holding Pond were discharged to the K-1407-C Retention Basin. The sludge in the K-1407-B Pond contained discharge from the K-1420 Decontamination and Uranium Recovery, the K-1501 Steam Plant, the K-1413 Laboratory, and the K-1401 Maintenance Building. Radioactive material is also present in the K-1407-C Retention Basin, probably the result of cleaning and decontamination activities at some of the aforementioned facilities. The discharge of waste materials to K-1407-C was discontinued before November of 1988, and all sludge was removed from the retention basin. Some of the sludge was stored, and the remainder was fixed in concrete. This report is specific to the K-1407-C Retention Basin and includes information pertinent to the evaluation of soil contamination. The focus of this evaluation is the effectiveness of the Phase 1 investigation of the K-1407-C Retention Basin to define site conditions adequately to support decisions regarding appropriate closure alternatives. This includes the physical characterization of the site area and the characterization of the nature and extent of contamination at the site in relation to risk characterization and statistical evaluation.

  15. Gaseous Hydrogen Compression | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    » Gaseous Hydrogen Compression Gaseous Hydrogen Compression Hydrogen is typically produced at relatively low pressures (20-30 bar) and must be compressed prior to transport. Most compressors used today for gaseous hydrogen compression are either positive displacement compressors or centrifugal compressors. Positive displacement compressors can be reciprocating or rotary. Reciprocating compressors use a motor with a linear drive to move a piston or a diaphragm back and forth. This motion

  16. Hydrogen and Gaseous Fuel Safety and Toxicity

    SciTech Connect (OSTI)

    Lee C. Cadwallader; J. Sephen Herring

    2007-06-01

    Non-traditional motor fuels are receiving increased attention and use. This paper examines the safety of three alternative gaseous fuels plus gasoline and the advantages and disadvantages of each. The gaseous fuels are hydrogen, methane (natural gas), and propane. Qualitatively, the overall risks of the four fuels should be close. Gasoline is the most toxic. For small leaks, hydrogen has the highest ignition probability and the gaseous fuels have the highest risk of a burning jet or cloud.

  17. Apparatus for recovering gaseous hydrocarbons from hydrocarbon...

    Office of Scientific and Technical Information (OSTI)

    A method and apparatus are provided for producing gaseous hydrocarbons from formations comprising solid hydrocarbon hydrates located under either a body of land or a body of water. ...

  18. Type B Accident Investigation Board Report of the Bechtel Jacobs Company, LLC Employee Fall Injury on January 3, 2006, at the K-25 Building, East Tennessee Technology Park, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    On Tuesday, January 3, 2006, at 1:55 pm, a Bechtel Jacobs Company LLC (BJC) iron worker accidentally fell through a degraded concrete floor panel while working in the K-25 Building at the East Tennessee Technology Park (ETTP).

  19. Microsoft Word - k-25 cover

    Broader source: Energy.gov (indexed) [DOE]

    ... and closed in 2008. Barring further problems, the Department estimates that just ... significant management attention is warranted thereby requiring on-site emergency planning. ...

  20. Process for exchanging hydrogen isotopes between gaseous hydrogen and water

    DOE Patents [OSTI]

    Hindin, Saul G.; Roberts, George W.

    1980-08-12

    A process for exchanging isotopes of hydrogen, particularly tritium, between gaseous hydrogen and water is provided whereby gaseous hydrogen depeleted in tritium and liquid or gaseous water containing tritium are reacted in the presence of a metallic catalyst.

  1. Development of Compact Gaseous Sensors with Internal Reference...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compact Gaseous Sensors with Internal Reference for Monitoring O2 and NOx in Combustion Environments Development of Compact Gaseous Sensors with Internal Reference for Monitoring ...

  2. Combination free electron and gaseous laser

    DOE Patents [OSTI]

    Brau, Charles A. (Los Alamos, NM); Rockwood, Stephen D. (Los Alamos, NM); Stein, William E. (Los Alamos, NM)

    1980-01-01

    A multiple laser having one or more gaseous laser stages and one or more free electron stages. Each of the free electron laser stages is sequentially pumped by a microwave linear accelerator. Subsequently, the electron beam is directed through a gaseous laser, in the preferred embodiment, and in an alternative embodiment, through a microwave accelerator to lower the energy level of the electron beam to pump one or more gaseous lasers. The combination laser provides high pulse repetition frequencies, on the order of 1 kHz or greater, high power capability, high efficiency, and tunability in the synchronous production of multiple beams of coherent optical radiation.

  3. Process for removing metal carbonyls from gaseous streams

    SciTech Connect (OSTI)

    Heyd, R.L.; Pignet, T.P.

    1988-04-26

    A process for removing metal carbonyl contaminates from a gaseous stream is described containing such contaminates and which is free from sulfur contaminates, which process comprises contacting the gaseous stream with a zinc sulfide absorbent to thereby remove metal carbonyl contaminates from the gaseous stream, and separating the gaseous stream from the zinc sulfide absorbent.

  4. Apparatus for diffusion separation

    DOE Patents [OSTI]

    Nierenberg, William A.

    1976-08-10

    1. A diffuser separator apparatus which comprises a plurality of flow channels in a single stage, each of said channels having an inlet port and an outlet port and a constant cross sectional area between said ports, at least a portion of the defining surface of each of said channels being a diffusion separation membrane, and each of said channels having a different cross sectional area, means for connecting said channels in series so that each successive channel of said series has a smaller cross sectional area than the previous channel of said series, a source of gaseous mixture, individual means for flowing said gaseous mixture to the inlet port of each of said channels, gas receiving and analyzing means, individual means for flowing gas passing from each of said outlet ports and means for flowing gas passing through said membranes to said receiving and analyzing means, and individual means for connecting the outlet port of each channel with the inlet port of the channel having the next smaller cross sectional area.

  5. Beta 3 at Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    235 for Little Boy. The feed material from first the Alpha calutrons, next the S-50 Thermal Diffusion Plant and finally the output of the K-25 Gaseous Diffusion Plant was...

  6. Little known heroes of the nuclear age, part 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    He would become one of the first people injured in the Manhattan Project. The S-50 Thermal Diffusion Plant was being constructed at the K-25 Gaseous Diffusion Plant site....

  7. Gaseous insulators for high voltage electrical equipment

    DOE Patents [OSTI]

    Christophorou, Loucas G.; James, David R.; Pace, Marshall O.; Pai, Robert Y.

    1979-01-01

    Gaseous insulators comprise compounds having high attachment cross sections for electrons having energies in the 0-1.3 electron volt range. Multi-component gaseous insulators comprise compounds and mixtures having overall high electron attachment cross sections in the 0-1.3 electron volt range and moderating gases having high cross sections for inelastic interactions with electrons of energies 1-4 electron volts. Suitable electron attachment components include hexafluorobutyne, perfluorobutene-2, perfluorocyclobutane, perfluorodimethylcyclobutane, perfluorocyclohexene, perfluoromethylcyclohexane, hexafluorobutadiene, perfluoroheptene-1 and hexafluoroazomethane. Suitable moderating gases include N.sub.2, CO, CO.sub.2 and H.sub.2. The gaseous insulating mixture can also contain SF.sub.6, perfluoropropane and perfluorobenzene.

  8. Gaseous insulators for high voltage electrical equipment

    DOE Patents [OSTI]

    Christophorou, Loucas G.; James, David R.; Pace, Marshall O.; Pai, Robert Y.

    1981-01-01

    Gaseous insulators comprise compounds having high attachment cross sections for electrons having energies in the 0-1.3 electron volt range. Multi-component gaseous insulators comprise compounds and mixtures having overall high electron attachment cross sections in the 0-1.3 electron volt range and moderating gases having high cross sections for inelastic interactions with electrons of energies 1-4 electron volts. Suitable electron attachment components include hexafluorobutyne, perfluorobutene-2, perfluorocyclobutane, perfluorodimethylcyclobutane, perfluorocyclohexene, perfluoromethylcyclohexane, hexafluorobutadiene, perfluoroheptene-1 and hexafluoroazomethane. Suitable moderating gases include N.sub.2, CO, CO.sub.2 and H.sub.2. The gaseous insulating mixture can also contain SF.sub.6, perfluoropropane and perfluorobenzene.

  9. Fuel Cells and Renewable Gaseous Fuels

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cell Technologies Office | 1 7/14/2015 Fuel Cells and Renewable Gaseous Fuels Bioenergy 2015: Renewable Gaseous Fuels Breakout Session Sarah Studer, PhD ORISE Fellow Fuel Cell Technologies Office Office of Energy Efficiency and Renewable Energy U.S. Department of Energy June 24, 2015 Washington, DC Fuel Cell Technologies Office | 2 7/14/2015 7/14/2015 DOE Hydrogen and Fuel Cells Program Integrated approach to widespread commercialization of H 2 and fuel cells Fuel Cell Cost Durability H 2 Cost

  10. Methods and systems for deacidizing gaseous mixtures

    DOE Patents [OSTI]

    Hu, Liang

    2010-05-18

    An improved process for deacidizing a gaseous mixture using phase enhanced gas-liquid absorption is described. The process utilizes a multiphasic absorbent that absorbs an acid gas at increased rate and leads to reduced overall energy costs for the deacidizing operation.