National Library of Energy BETA

Sample records for item-by-item instructions schedule

  1. Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Please contact the beamline staff to schedule data collection. CAMD's operation schedule

  2. Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules Schedules Print Current Long-Term Operating Schedule February 2016-June 2016 Past Long-Term Operating Schedules July 2015-January 2016 (.xls) January-June 2015 (.xls) July-December 2014 (.xls) January-June 2014 (.xls) August-December 2013 (.xls) January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008 January-June 2008 July-December 2007 February-June 2007

  3. Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules Print Current Long-Term Operating Schedule February 2016-June 2016 Past Long-Term Operating Schedules July 2015-January 2016 (.xls) January-June 2015 (.xls) July-December 2014 (.xls) January-June 2014 (.xls) August-December 2013 (.xls) January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008 January-June 2008 July-December 2007 February-June 2007 July

  4. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix for Schedule 8D Withdrawal: Report the water that is removed from a water body for cooling, i.e. water used through the condenser. Discharge: Report the flow of water that is returned to the water body. Diversion: Diversion is not expected with once through systems. Consumption: Evaporative losses are not expected with once through systems as withdrawal should equal discharge. Withdrawal: Report the water that is removed from a water body for cooling, i.e. water used through the

  5. Schedule - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule Cyclotron Schedule

  6. Operation Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operation Schedule Daily Hours of Operation

  7. The Schedule

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The schedule is one of the building blocks for project development. A schedule helps determine the duration of the project, the critical activities, and when funds are required. This chapter will briefly discuss some scheduling basics.

  8. Procedures and Instructions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedure for Conducting a Records Inventory (PDF) Procedure for Preparing a Records Inventory and Disposition Schedule (RIDS) (PDF) InstructionsBrochures Managing Social Media ...

  9. Rate Schedules

    Broader source: Energy.gov [DOE]

    One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

  10. Current Schedule of Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Schedule of Experiments Current Schedule of Experiments - Updated 2/2016

  11. LANSCE-NS Block Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANSCE Planned Run Schedule - 2015/2016 run_schedule

  12. UGE Scheduler Cycle Time

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UGE Scheduler Cycle Time UGE Scheduler Cycle Time Genepool Cycle Time Genepool Daily Genepool Weekly Phoebe Cycle Time Phoebe Daily Phoebe Weekly What is the Scheduler Cycle? The...

  13. NERSC Scheduled System Outages

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled System Outages NERSC Scheduled System Outages Last edited: 2016-02-01 08:07:08

  14. Procedures and Instructions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management » Procedures and Instructions Procedures and Instructions keyboard-886462_960_720.jpg Records Management Processes Procedure for Conducting a Records Inventory (PDF) Procedure for Preparing a Records Inventory and Disposition Schedule (RIDS) (PDF) Instructions/Brochures Managing Social Media Records (PDF) Procedures for Departing Employees (PDF) Reminder for Senior Officials (PDF) Your Records Responsibility Pamphlet (PDF) Vital Records Pamphlet (PDF) Records Management Assessment

  15. Proposal Submittal and Scheduling Procedures for Research | Stanford

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Synchrotron Radiation Lightsource Proposal Submittal and Scheduling Procedures for Research New Proposals Standard GU Proposals Instructions for New Standard Proposals (Not LOI or Rapid Access) Tips for How to Wow Rapid Access Letter of Intent (LOI) Proposal Extension Requests X-ray/VUV Macromolecular Crystallography Beam Time Allocation/Scheduling How to Request Beam Time SSRL Access Policy SSRL Schedules Publications & Reports New Proposals SSRL operates as a dedicated synchrotron

  16. LANSCE | User Resources | Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules You will be notified of your experiment schedule at least 3-6 weeks prior to your start date. Two (2) weeks post-review, beam-time will be scheduled by the Instrument Scientist in consultation with the user. Three (3) weeks post review, schedule letters are sent to the Principal Investigator. After scheduling experiments, the LANSCE User Office will contact you to determine and schedule applicable training, assist with travel arrangements, initiate and required foreign national access

  17. Accelerator and Experiment Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nominal Dates for Scheduling Requests (updated July 10, 2014) Please see the information for the requirements before scheduling can be requested at http:www.jlab.org...

  18. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  19. UGE Scheduler Cycle Time

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UGE Scheduler Cycle Time UGE Scheduler Cycle Time Genepool Cycle Time Genepool Daily Genepool Weekly Phoebe Cycle Time Phoebe Daily Phoebe Weekly What is the Scheduler Cycle? The Univa Grid Engine Scheduler cycle performs a number of important tasks, including: Prioritizing Jobs Reserving Resources for jobs requesting more resources (slots / memory) Dispatching jobs or tasks to the compute nodes Evaluating job dependencies The "cycle time" is the length of time it takes the scheduler

  20. ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and ...

  1. Experiment Report Instructions General Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report Instructions General Instructions * Experiment Reports must be submitted for all experiments conducted at LANSCE. * A compilation of Experiment Reports for each run cycle will be published as part of the LANSCE Annual Activity Report. * Experiment Reports are reviewed by the Program Advisory Committee for continuing expements. * Follow detailed form instructions below and complete entire form. * Reports must be written in English. * The available space on the form must be respected.

  2. Dedicated heterogeneous node scheduling including backfill scheduling

    DOE Patents [OSTI]

    Wood, Robert R. (Livermore, CA); Eckert, Philip D. (Livermore, CA); Hommes, Gregg (Pleasanton, CA)

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  3. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    124 i PART I - THE SCHEDULE SECTION F - DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE ......

  4. NERSC Holiday Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Holiday Schedule NERSC Holiday Schedule December 20, 2013 by Francesca Verdier All NERSC computing and storage systems will remain in full operation throughout the holiday season (Tuesday December 24 through Wednesday January 1). From Tuesday December 24 through Wednesday January 1, NERSC Consulting and Account Support services will be available *only* on Friday December 27 and Monday December 30, from 8:00 to 5:00 Pacific Time. Normal Consulting and Account Support schedules will resume on

  5. SRI2007 Conference - Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Gallery Manuscript Submission Conference Schedule SRI2007 conference will feature oral and poster sessions on synchrotron-radiation related topics; sources, beamlines,...

  6. ADMINISTRATIVE RECORDS SCHEDULE 20:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the ...

  7. Disposition Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition Schedules Disposition Schedules keyboard-70506__180.jpg Records Disposition Schedules The DOE Records Disposition Schedules provide the authority for transfer and disposal of records created and maintained by the Department. Disposition Schedules and the citations to the disposition authorities are available at the following links: DOE Administrative Records Schedules -- provides a list of records contained in the NARA General Records Schedule as customized to the needs of the

  8. Project organizations and schedules

    SciTech Connect (OSTI)

    Briggs, R.J.

    1990-07-01

    The Superconducting Super Collider Laboratory (SSCL) faces the challenge of simultaneously carrying out a large-scale construction project with demanding cost, schedule, and performance goals; and creating a scientific laboratory capable of exploiting this unique scientific instrument. This paper describes the status of the laboratory organization developed to achieve these goals, and the major near-term schedule objectives of the project.

  9. SSRL- Experimental Run Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY2008 Experimental Run Schedules 2008 Run Ends August 11, 2008. User Operations will resume November 2008. Operating / Maintenance Beam Line Schedule FY2009 FY2008 X-ray (1-4, 2-1, 2-3, 4-2, 6-2, 7-2, 7-3, 9-3, 10-2, 11-2, 11-3) Macromolecular Crystallography Support Staff Schedule (1-5, 7-1, 9-1, 9-2, 11-1) VUV (5-1, 5-2, 5-4, 8-1, 8-2, 10-1) Schedules for previous years Accelerator Schedule (for staff): Accelerator Physics SPEAR Maintenance and Shutdown SPEAR Startup Injector Startup

  10. Module 3 - Project Scheduling | Department of Energy

    Energy Savers [EERE]

    3 - Project Scheduling Module 3 - Project Scheduling This module focuses on developing the project schedule. This module differentiates between planning and scheduling and outlines basic scheduling concepts, the logic relationships and critical path, and different schedule formats

  11. Upcoming Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming Long-Term Operating Schedule Print

  12. Wholesale Power Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rate Schedules Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System:...

  13. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Contract No. DE-AC06-09RL14728 G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CONTRACT ADMINISTRATION ......

  14. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Contract No. DE-AC27-08RV14800 Modification No. 020 G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CONTRACT ADMINISTRATION...

  15. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Contract No. DE-AC06-08RL14788 G-i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CONTRACT ADMINISTRATION ......

  16. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    572 dated 3215 Contract No. DE-AC04-94AL85000 Modification No. M202 Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED...

  17. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    93015 to Mod 0588 Contract No. DE-AC04-94AL85000 Modification No. M202 Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED...

  18. PART I - SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Universities DE-AC05-06OR23100 Modification 0515 Section H - Page 1 of 47 PART I - SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS H.1 CONSECUTIVE NUMBERING (MAY 1997) ...

  19. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC27-10RV15051 Conformed thru Modification No. 117 i PART I - THE SCHEDULE SECTION H - SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 RELEASE OF INFORMATION ...

  20. Schedule of Technical Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Fish Mitigation plant-in-service schedule Process used to review CRFM program Benchmarking mid-C hydro projects Timing for spill tests on Snake River Cost management efforts...

  1. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC06-09RL14728 D-i PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING ......

  2. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC27-08RV14800 D-i PART I - THE SCHEDULE SECTION D PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING ......

  3. Re: 'BPA Upcoming Schedule'

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Re: 'BPA Upcoming Schedule' Larson,Cheryl A - PS-6 From: Kari, Don (Perkins Coie) DKari@perkinscoie.com Sent: Monday, July 14, 2008 9:36 AM To: Larson,Cheryl A - PS-6 Cc:...

  4. Energy Exchange Schedule

    Broader source: Energy.gov [DOE]

    The schedule for Energy Exchange is now available. Attendees will have the option of attending a variety of training sessions offered within 10 tracks during the times listed below. Session details...

  5. Pushing schedule derivation method

    SciTech Connect (OSTI)

    Henriquez, B.

    1996-12-31

    The development of a Pushing Schedule Derivation Method has allowed the company to sustain the maximum production rate at CSH`s Coke Oven Battery, in spite of having single set oven machinery with a high failure index as well as a heat top tendency. The stated method provides for scheduled downtime of up to two hours for machinery maintenance purposes, periods of empty ovens for decarbonization and production loss recovery capability, while observing lower limits and uniformity of coking time.

  6. Current Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet .

  7. Current Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet .

  8. Current Long-Term Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Long-Term Operating Schedule Print This schedule is also available as an .xls spreadsheet .

  9. Instructions | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructions See the links below for instructions on how-to do the following: Sign an Expense Reimbursement (ER) Print an Enterprise Rental Car Receipt

  10. Weekly User Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weekly User Schedule Print Requests for special operations use of the "scrubbing" shift should be sent directly to Warren Byrne (486-7517) by 1:00 p.m. Friday. Any requests for changes in beam energy, bucket fill pattern, scrubbing shifts, or machine setup must be submitted to This e-mail address is being protected from spambots. You need JavaScript enabled to view it by 4:00 pm on Wednesday, the week before the scheduled run, for consideration during Thursday's Physics meeting. These

  11. Weekly User Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weekly User Schedule Print Requests for special operations use of the "scrubbing" shift should be sent directly to Warren Byrne (486-7517) by 1:00 p.m. Friday. Any requests for changes in beam energy, bucket fill pattern, scrubbing shifts, or machine setup must be submitted to This e-mail address is being protected from spambots. You need JavaScript enabled to view it by 4:00 pm on Wednesday, the week before the scheduled run, for consideration during Thursday's Physics meeting. These

  12. Weekly User Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weekly User Schedule Print Requests for special operations use of the "scrubbing" shift should be sent directly to Warren Byrne (486-7517) by 1:00 p.m. Friday. Any requests for changes in beam energy, bucket fill pattern, scrubbing shifts, or machine setup must be submitted to This e-mail address is being protected from spambots. You need JavaScript enabled to view it by 4:00 pm on Wednesday, the week before the scheduled run, for consideration during Thursday's Physics meeting. These

  13. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-10RV15051 Conformed Thru Contract Modification No. A001 i PART I - THE SCHEDULE SECTION E - INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 FAR 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984) ................................................................................................ 1 E.2 ACCEPTANCE .......................................................................................... 1 E.3

  14. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 109 i PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.1 CORRESPONDENCE PROCEDURES .................................................... 1 G.2 CONTRACT ADMINISTRATION .............................................................. 2 G.3 CONTRACTOR'S POINT OF CONTACT ................................................. 3 G.4 DOE CONTRACTING OFFICER'S REPRESENTATIVE ......................... 3 G.5

  15. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC27-08RV14800 Modification No. A015 F-i PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE ........................................................................................................ 1 F.2 PRINCIPAL PLACE OF PERFORMANCE ...................................................................................... 1 F.3 FAR 52.242-15, STOP-WORK ORDER (AUG 1989) -- ALTERNATE I (APR 1984) ...................... 2 Tank

  16. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    B - H, Page i PART I - THE SCHEDULE TABLE OF CONTENTS SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS ......................................................................... 3 B-1 SERVICES BEING ACQUIRED ........................................................................................................ 3 CLIN 0001 MANAGEMENT AND OPERATION OF THE NEVADA NATIONAL SECURITY SITE ............. 3 CLIN 0001A TRANSITION TERM

  17. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    Part I - The Schedule Sections B through H TABLE OF CONTENTS Section B - SUPPLIES OR SERVICES AND PRICES/COSTS ............................................................. 4 B-1 ......SERVICES BEING ACQUIRED.................................................................................................. 4 B-2 ......CONTRACT TYPE AND VALUE ............................................................................................... 4 Section C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

  18. ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECORDS COMMON TO MOST OFFICES | Department of Energy ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value PDF icon

  19. Shuttle Schedule | Department of Energy

    Energy Savers [EERE]

    Shuttle Schedule Shuttle Schedule PDF icon Sheraton Pentagon Shuttle.pdf More Documents & Publications 2015 APM Workshop - Sheraton Pentagon Shuttle Fact Sheet 2016 DOE Project Management Workshop - Transportation 2014 DEPARTMENT OF ENERGY PROJECT MANAGEMENT WORKSHOP

  20. DMSE Equipment Scheduling | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduling Equipment ownercustodian reserves the right to override the schedule for maintenance andor other justified reasons. Abuse of the scheduling system or equipment may...

  1. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC06-09RL14728 Modification 343 PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS F.1 PERIOD OF PERFORMANCE .................................................................................... F-1 F.2 PRINCIPAL PLACE OF PERFORMANCE .................................................................. F-1 F.3 FAR 52.242-15, STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984) ..... F-2 F-i Mission Support Contract Section F Contract No. DE-AC06-09RL14728

  2. Queues and Scheduling Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queues and Policies Queues and Scheduling Policies Users submit jobs to a submit queue and wait in line until nodes become available to run a job. NERSC's queue structures are intended to be fair and to allow jobs of various sizes to run efficiently. Balancing the job size and throughput requirements of a large number of users is always a challenge. We encourage users to send questions, feedback, or concerns about the queue structures, to the consultants. Queue Classes Submit Queue Execution

  3. INSTRUCTIONS FOR THE SF-424

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "Required" in the instructions below. In addition to these instructions, applicants must consult agency instructions to determine other specific requirements. Item Entry: Item:...

  4. Model Energy Savings Performance Contract, Schedules, and Exhibits...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Agreement and Payment Schedule Schedule J: Compensation to ESCO for Annual Services Schedule K: Rebates, Incentives and Grants Schedule L: Contingency Fund Schedules M-P: ...

  5. ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services ...

  6. PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract No. DE-AC06-08RL14788 M047 E-i PART I - THE SCHEDULE SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 DOE INSPECTION AND ACCEPTANCE ....................................................................... E-1 E.2 FAR 52.246-3, INSPECTION OF SUPPLIES - COST-REIMBURSEMENT (MAY 2001) E-2 E.3 FAR 52.246-5, INSPECTION OF SERVICES - COST REIMBURSEMENT (APR 1984) E-3 Plateau Remediation Contract Section E Contract No. DE-AC06-08RL14788 M047 E-1 E.1 DOE INSPECTION AND ACCEPTANCE (a)

  7. _PART I - THE SCHEDULE

    National Nuclear Security Administration (NNSA)

    9/30/15 to Mod 0588 Contract No. DE-AC04-94AL85000 Modification No. M202 Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED ......................................................................................... 4 B-2 CONTRACT TYPE AND VALUE (Rev. M218, M222, M236, M241, M261, M266, M288, M293, M312, M319, M344, M365, M400, M404, M443, M448, M473, M484, M0512, M0528, M0538, M0541, M0563, M0567, A0588)

  8. Experiment Scheduling Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Scheduling Committee Title Name Phome Email Deputy Director for Research Bob McKeown (757) 269-6481 bmck@jlab.org Physics Division AD (co-chair) Rolf Ent (757) 269-7373 ent@jlab.org Physics Division Deputy AD Patrizia Rossi (757) 269-7740 rossi@jlab.org Physics Division Assistant Director Javier Gomez (757) 269-7468 gomez@jlab.org Halls A & C Leader Cynthia Keppel (757) 269-7580 keppel@jlab.org Hall B Leader Volker Burkert (757) 269-7540 burkert@jlab.org Hall D Leader Eugene

  9. Internal Patent Instructions

    Broader source: Energy.gov [DOE]

    The internal patent instructions (IPIs) were originally established as a means for providing a common reference source to all patent counsel offices on centralized instructions, as stated in the...

  10. Instructions and Materials

    Broader source: Energy.gov [DOE]

    The following are 2012 Program Peer Review Meeting instructions, materials and resource links for presenters and reviewers.

  11. WNR Monthly Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home WNR Schedule Text and Schedule Bar Color Key Previous Next March 2016 Flight Path S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 WNR 4FP15L-A/20m 4FP15L-B/90m 4FP15R 4FP30L-A/ICE House 4FP30L-B 4FP30R/ICE II 4FP60R/GEANIE 4FP90L/TPC Miscellaneous 7008Proposal: NS-2015-7008-F PI: Matthew Devlin Institution: Los Alamos National Laboratory Title:

  12. Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power

  13. Construction Schedule | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

  14. Extensible Argonne SP Scheduling System

    Energy Science and Technology Software Center (OSTI)

    1996-01-24

    The Argonne SP Scheduler provides deterministic queuing of jobs for exclusive access to the SP nodes for either batch or interactive use.

  15. Regulated Schedule 9

    U.S. Energy Information Administration (EIA) Indexed Site

    UTILITY","UTILITY_NAME","PLANT_ID","PLANT_NAME","SCHEDULE","LINENO","COL1AMOUNT","DESCRIPTION" 2002,298,"Alexandria City of",6558,"D G Hunter",9,1,"STEAM","Kind of Plant" 2002,298,"Alexandria City of",6558,"D G Hunter",9,2,1956,"Year Originally Constructed" 2002,298,"Alexandria City of",6558,"D G Hunter",9,3,1974,"Year Last Unit

  16. ADMINISTRATIVE RECORDS SCHEDULES COMPILED | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SCHEDULES COMPILED ADMINISTRATIVE RECORDS SCHEDULES COMPILED The Administrative Records Schedules are intended to provide a consolidated and customized DOE listing of schedule information compiled from NARA-approved GRS and DOE-specific Records Control Schedules. The Administrative Records Schedules are being compiled into one document for easy reference and use; this version of this document includes only Administrative Records Schedules 1 & 2 and supersedes the 2010 edition of these

  17. DOERS Records Schedule Cross Index to DOE Administrative Records

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition Schedules | Department of Energy DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules Crosswalk between DOERS and Admin Schedules PDF icon DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules More Documents & Publications DOE Records Disposition Schedule Changes ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL

  18. User instructions for programs NEDIT and NPRED

    SciTech Connect (OSTI)

    Gross, R.J.

    1983-02-01

    NEDIT and NPRED are computer programs developed for the Strategic Petroleum Reserve (SPR) Program to assist the SPR system designers and operators in scheduling the leaching and oil-filling of the SPR salt caverns. NEDIT is an interactive program which assists the user in creating or editing a data set; NPRED in turn uses this data set to perform the engineering calculations. Various activities are necessary to achieve a man-made cavern filled with a maximum quantity of oil in minimum time. NPRED predicts the time required for each such activity, thus providing a site oil-capacity schedule. Instructions for using the codes are presented and examples are shown. 1 figure, 5 tables.

  19. DOE TRANSCOM Technical Support Service DE-EM0002903 G-1 PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE TRANSCOM Technical Support Service DE-EM0002903 G-1 PART I - THE SCHEDULE SECTION G CONTRACT ADMINISTRATION DATA TABLE OF CONTENTS G.01 CORRESPONDENCE PROCEDURES .......................................................................................... G-2 G.02 BILLING INSTRUCTIONS ........................................................................................................... G-3 G.03 DEFECTIVE OR IMPROPER INVOICES

  20. LCLS Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD

  1. FedConnect Instructions

    Broader source: Energy.gov [DOE]

    Here are instructions to make it easier to locate Funding Opportunity Announcements (FOAs) for the Geothermal Technologies Office at the FedConnect Web site.

  2. Administrative Records Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER Administrative Records Schedules Compiled - (Schedules 1 & 2) (pdf) 01/06/15 --- 1 Personnel Records - Superseded - See Compiled (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records - Superseded - See Compiled (pdf) 09/15/10

  3. ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...

    Broader source: Energy.gov (indexed) [DOE]

    & Publications ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADM 6 PDF...

  4. Administrative Records Schedule 1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrative Records Schedule 1 Administrative Records Schedule 1 ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs,...

  5. ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...

    Energy Savers [EERE]

    ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS Audiovisual Records ADM 21...

  6. ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the ...

  7. Alexandria Hilton Shuttle Schedule | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Schedule.doc More Documents & Publications 2015 APM Workshop - Sheraton Pentagon Shuttle Fact Sheet Shuttle Schedule Phoenix Area Transportation Information for Energy Exchange...

  8. LCLS Operations Schedule January February...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Schedule January February March April May June July August September October November December 2009 Run 1 Oct. 1-Dec. 17 2010 Run 2 Run 3 May 6 - Sep. 13 Oct. 7 - Dec....

  9. FY 2016 PMCDP Training Schedule

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Update February 29, 2016 1 | P a g e FY 2016 PMCDP Training Schedule Q1 FY 2016: Course Title Length Planned Delivery Timeframe Location Platform Equivalent Training Planning for ...

  10. Intensive Observation Period Projects Scheduled

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Intensive Observation Period Projects Scheduled Several IOP projects have been scheduled for the SGP CART site this spring. These projects either have already begun or will begin shortly. Radiosondes The RS-90 Transition IOP is currently under way. The RS-90 model radiosonde is gradually replacing the older RS-80 model. Radiosondes are instrument packages attached to and launched by weather balloons. The instruments measure atmospheric pressure, temperature, and relative humidity as the

  11. ORISE: Instructional Design and Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    customized training and instructional design programs, from traditional classroom teaching to online education. ORISE uses a multi-step process to define the instructional...

  12. Administrative Records Schedule: Communication Records | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function PDF icon Administrative Records Schedule: Communication Records More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS ADM 12 PDF Communications Records

  13. Wholesale Power Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None

  14. DOE Records Disposition Schedule Changes | Department of Energy

    Energy Savers [EERE]

    Records Disposition Schedule Changes DOE Records Disposition Schedule Changes Disposition Schedule Changes PDF icon DOE Records Disposition Schedule Changes More Documents & Publications DOE Administrative Records Schedules Changes DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS

  15. Plans and Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » About » Plans and Schedules Plans and Schedules The Appliances and Equipment Standards program maintains a multi-year rulemaking schedule. The currently scheduled rulemaking activities are described in the program's semi-annual implementation report to Congress. The program will also issue other plans and schedules when needed. The most recent 5-year plan was released in October 2010 and outlines how the program planned to meet all the statutory

  16. PROPOSAL PREPARATION INSTRUCTIONS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-08RV14800 Modification No. A015 PROPOSAL PREPARATION INSTRUCTIONS 1. INTRODUCTION This document contains instructions to the contractor for the preparation of a proposal in response to the modification of the contract which defines work that will be funded by and performed under the provisions of the American Recovery and Reinvestment Act (Recovery Act). The contractor shall provide a written proposal consisting of a Technical Proposal and a Cost and Fee Proposal. The

  17. DOE Administrative Records Schedules Changes | Department of Energy

    Energy Savers [EERE]

    Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules PDF icon DOE Administrative Records Schedules Changes More Documents & Publications DOE Records Disposition Schedule Changes ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS

  18. Topic Index to the DOE Administrative Records Disposition Schedules |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative Records Disposition Schedules PDF icon Topic Index to the DOE Administrative Records Disposition Schedules More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS

  19. Named Fellowship Applicant Instructions | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applicant Instructions Instructions for applying for Argonne Named Fellowships. More information is available online. PDF icon NamedFellowshipApplicantInstructions

  20. 2014-2015 Power Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Power Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy Bonneville Power Administration 905 N.E. 11th Avenue...

  1. Graduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  2. Undergraduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive...

  3. ALS Operating Schedule on Google Calendar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ALS Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display...

  4. Wholesale Power Rate Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CM-1-H Wholesale Power Rate...

  5. Full Proposal Instructions_2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Full Proposal Instructions NIF Facility Time Proposal Please prepare your full proposal according to the following instructions. Append biographical sketches(CVs) for the Principal Investigator (PI) and no more than 5 additional key team members to the end of this proposal. Submission Deadlines: Save the entire document as a single file in pdf format, and submit via the Web submission tool before 11:59 p.m. on September 1, 2015, PDT. I. COVER SHEET: (1 page) 1) Please provide the proposal title,

  6. Inspection/Sampling Schedule | Department of Energy

    Energy Savers [EERE]

    Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 22, 2016 December 3, 2015 Bluewater, NM, Disposal Site August 22, 2016 December 2, 2015 May 23, 2016 BONUS, PR, Decommissioned Reactor Site No annual inspections N/A Burrell, PA, Disposal Site October 28, 2015

  7. ADMINISTRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS (Revision...

    Broader source: Energy.gov (indexed) [DOE]

    programs, job vacancies, unemployment compensation, recruitment and employee health ADM 10.pdf More Documents & Publications Administrative Records Schedule 1 ADMINISTRATIVE...

  8. ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...

    Energy Savers [EERE]

    7: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC,...

  9. Document Status & Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Document Status & Schedules Document Status & Schedules Schedules of Key Environmental Impact Statements This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly). Environmental Impact Statement and Environmental Assessment Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy including the dates of important milestones in the NEPA process and references to more

  10. Multi-Year Schedule | Department of Energy

    Office of Environmental Management (EM)

    Schedule Multi-Year Schedule Table 2 presents DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. PDF icon multiyear_schedule_aug_2011.pdf More Documents & Publications 9th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation Standards Activities 11th Semi-Annual Report to Congress on Appliance Energy Efficiency Rulemakings - Implementation Report: Energy Conservation

  11. 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Procurement Evaluation and Re-engineering Team (PERT) Schedule 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule PDF icon PERT Schedule 2015.pdf More Documents...

  12. Schedule of Events - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule of Events Schedule of Events 2015 Schedule of Events 2015 The Trustees of Princeton University Last update: May 19, 2015...

  13. 1997 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 11, '96 17:00 Tue, Nov 12, '96 13:00 Tue, Nov 19, '96 15:00-Wed, Nov 20, '96 02:00 11 hrs Mon, Dec 02, '96 17:00 Tue, Dec 03, '96 13:00 Mon, Dec 09, '96 06:00-Wed, Dec 11, '96 02:00 44 hrs Mon, Jan 06, 17:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Jan 20, 17:00 Tue, Jan 21, 13:00 Mon, Jan 27, 06:00-Wed, Jan 29, 02:00 44 hrs Mon, Feb 03, 17:00 Tue, Feb 04,

  14. 1998 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03,

  15. 1999 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb

  16. 2000 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15,

  17. 2001 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 06, '00 17:00 Tue, Nov 07, '00 13:00 Mon, Nov 13, '00 18:00-Wed, Nov 15, '00 02:00 32 hrs Mon, Dec 04, '00 17:00 Tue, Dec 05, '00 13:00 Mon, Dec 11, '00 06:00-Wed, Dec 13, '00 02:00 44 hrs Mon, Jan 01, 17:00 Tue, Jan 02, 13:00 Mon, Jan 08, 18:00-Wed, Jan 10, 02:00 32 hrs Fri, Jan 12, 12:00 Tue, Jan 16, 13:00 Mon, Jan 22, 06:00-Wed, Jan 24, 02:00 44 hrs Mon, Jan 29, 17:00 Tue, Jan 30,

  18. 2002 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue,

  19. 2003 SSRL Accelerator Physics Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Dec 02, '02 17:00 Tue, Dec 03, '02 13:00 Mon, Dec 09, '02 18:00-Wed, Dec 11, '02 02:00 32 hrs Tue, Jan 07, 09:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 17:00 Mon, Feb 10, 18:00-Wed, Feb 12, 02:00 32 hrs Mon, Feb 24, 17:00 Tue, Feb 25, 13:00 Mon, Mar 03, 18:00-Wed, Mar 05, 02:00 32 hrs SLAC SSRL SSRL Last Updated: 25 February 2003

  20. ADMINISTRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS (Superseded) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy : PERSONNEL RECORDS (Superseded) ADMINISTRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS (Superseded) The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health PDF icon Administrative Records Schedule 1-Personnel Records.pdf More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL

  1. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  2. Microsoft Word - Changes-to-Schedules _Recovered_

    Office of Environmental Management (EM)

    Changes-to-Schedules REV 5 DOE Administrative Records Schedules Changes Last revised: 12/10/2010 Date DOE Admin Schedule Item(s) Change Authorizing Document 9/15/10 - 12/10/2010 1-6, 9, 11-12, 14, 16-18, 22- 23 Various Removal of items at the end of each schedule for e-mail and word processing copies, which were added to the GRS in Transmittal Number 8. For schedules in which this item is located elsewhere and removal would cause changes in the sequence of item numbers, the item was changed to

  3. Step by Step Instructions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Step by Step Instructions For Completing An Information Collection Request 1. A determination must be made if a Federal entity has an Information Collection Request (ICR). To assist in making that determination, the Paperwork Reduction Act (PRA)states the following: The PRA requires each Federal agency to seek and obtain Office of Management and Budget (OMB) approval before undertaking a collection of information directed to ten or more people of the general public, including federal

  4. EIA-176 Instructions

    Gasoline and Diesel Fuel Update (EIA)

    DEPARTMENT OF ENERGY Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 12/31/2017 ANNUAL REPORT OF NATURAL AND SUPPLEMENTAL GAS SUPPLY AND DISPOSITION FORM EIA-176 INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," is designed to collect data on natural, synthetic, and other supplemental gas supplies, disposition, and certain revenues

  5. EIA-757 Instructions

    Gasoline and Diesel Fuel Update (EIA)

    DEPARTMENT OF ENERGY Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 12/31/2017 NATURAL GAS PROCESSING PLANT SURVEY FORM EIA-757 INSTRUCTIONS QUESTIONS If you have any questions on the Form EIA-757, please contact EIA at (877) 800-5261. PURPOSE The Energy Information Administration (EIA) Form EIA-757, "Natural Gas Processing Plant Survey," is used to collect information on the capacity, status, operations, and connecting

  6. EIA-910 Instructions

    Gasoline and Diesel Fuel Update (EIA)

    Page 1 U.S. DEPARTMENT OF ENERGY Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 12/31/2017 MONTHLY NATURAL GAS MARKETER SURVEY FORM EIA-910 INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-910, "Monthly Natural Gas Marketer Survey," is used to collect information on natural gas sales from marketers in selected States that have active customer choice programs. The EIA is requesting information on the

  7. EIA-912 Instructions

    Gasoline and Diesel Fuel Update (EIA)

    Page 1 U.S. DEPARTMENT OF ENERGY ENERGY INFORMATION ADMINISTRATION Washington, DC 20585 Form Approved OMB No. 1905-0175 Expiration Date: 12/31/2017 EIA-912 WEEKLY UNDERGROUND NATURAL GAS STORAGE REPORT INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-912, "Weekly Underground Natural Gas Storage Report," is used to collect information on weekly inventories of natural gas in underground storage facilities. Data are collected pursuant to the Federal Energy

  8. DOE HQ Shuttle Bus Route and Schedule

    Energy Savers [EERE]

    Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. The shuttle bus departure and arrival times may be impacted by traffic, weather, or other logistical interruptions. Headquarters employees are reminded

  9. Stochastic Optimal Scheduling of Residential Appliances with...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Return to Search Stochastic Optimal Scheduling of Residential Appliances with Renewable Energy Sources National Renewable Energy Laboratory Contact NREL About This Technology ...

  10. CM-1-H Wholesale Power Rate Schedule

    Broader source: Energy.gov [DOE]

    Availability:This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter...

  11. ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This schedule covers accountable officers' returns and related records, including records under the cognizance of the General Accountability Office (GAO). PDF icon ADMINISTRATIVE ...

  12. ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...

    Broader source: Energy.gov (indexed) [DOE]

    OFFICERS' ACCOUNTS RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS Accountable Officers' Accounts Records ADM 6 PDF...

  13. ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...

    Energy Savers [EERE]

    AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS ADM 18 PDF...

  14. AVLIS production plant project schedule and milestones

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  15. JOBAID- WITHDRAWING FROM A SCHEDULED OFFERING

    Broader source: Energy.gov [DOE]

    The purpose of this job aid is to guide users through the step-by-step process of withdrawing from a scheduled offering.

  16. Technical Qualification Program Accreditation Schedule | Department...

    Broader source: Energy.gov (indexed) [DOE]

    TQP Accreditation Schedule More Documents & Publications Technical Qualification Program Self-Assessment Report - Nevada Site Office - 2009 FTCP Corrective Action Plan - Revision...

  17. ORISE: Instructional Design and Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructional Design and Development The Oak Ridge Institute for Science and Education (ORISE) works with government agencies and organizations to create customized training and instructional design programs, from traditional classroom teaching to online education. ORISE uses a multi-step process to define the instructional design and development needs. Our process includes: Defining the target audience and objectives Designing and developing the program and materials Piloting, delivering and

  18. Application Schedule - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Application Schedule Application Schedule Applications for the Combustion Energy Research Fellows program are considered on a rolling basis. Applicant selection occurs three times per year. The respective deadline for upload of required application documents is: August 31 December 31 April 30 Award announcements will be made shortly thereafter. © 2016 The Trustees of Princeton University Last update: February 2, 2011

  19. Streams-C Scheduler and Library

    Energy Science and Technology Software Center (OSTI)

    2001-12-04

    The scheduler accepts a preprocessed C program with optional Streams-C extensions. It translates it to a normalized form with additional information for scheduling it on a reconfigurable architecture. The resulting file is accepted by the Streams-C VHDL generator, not part of this package.

  20. NRC comprehensive records disposition schedule. Revision 3

    SciTech Connect (OSTI)

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  1. NC-1-B Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia PowerCP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  2. CTV-1-H Wholesale Power Rate Schedule | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    TVA. Document Available for Download PDF icon CTV-1-H Rate Schedule More Documents & Publications CTVI-1-A Wholesale Power Rate Schedule CEK-1-H Wholesale Power Rate Schedule CM

  3. CBR-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers ...

  4. CSI-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CSI-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power...

  5. JW-2-F Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-F Wholesale Power Rate Schedule JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff This rate schedule shall be available to the Florida ...

  6. EM Quality Assurance Assessment Schedule FY 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DISTRIBUTION FROM: DR. STFDlN L. KRAHN DEPUTY ASSlS SAFETY ENVIRONhtENTAL MANAGEMENT SUBJECT: U p d a t e d F i Year 2010 Environmental Mmagemmt Quality Assurance Assessment Schedule AWhed for planuing and coordination purposes is t h e updated Ql&ty Amtrance {OA) asesmmt schedule for the remainder of fiscal year $Y) 2010. . - , The schedule is organized per the various types of QA asmmum@ that will k led by the Office of S t a n e and Quality Assurance (EM-23) or the Field elements. Please

  7. Site Specific Records Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Specific Records Schedules Site Specific Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. TITLE DATE LAST CHANGED AUTHORIZATION / SCHEDULE NUMBER AEC -- Administrative Record 01/15/01 II-NNA-6754 AEC -- Nuclear Power Plant Docket Records 01/15/01 NC-174-231 AEC -- Power Reactor Records, Summaries of Data and Statistics Useful in the Control of Operations, Source Records Utilized in Compiling Summaries and Reports in

  8. EVMS Training Snippet: 3.3 Schedule Guidance and Resources |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Schedule Guidance and Resources EVMS Training Snippet: 3.3 Schedule Guidance and Resources This EVMS Training Snippet, sponsored by the Office of Project Management (PM) provides...

  9. POLICY GUIDANCE MEMORANDUM #32A Schedule A Appointments of Persons...

    Office of Environmental Management (EM)

    2A Schedule A Appointments of Persons with Disabilities and Appointments for Disabled Veterans POLICY GUIDANCE MEMORANDUM 32A Schedule A Appointments of Persons with Disabilities...

  10. Schedule and Information for Small Business Innovation Research...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schedule and Information for Small Business Innovation Research and Small Business Technology Transfer Program Applicants Schedule and Information for Small Business Innovation...

  11. Descriptions of ESPC Task Order Schedules and Placement of Pricing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Descriptions of ESPC Task Order Schedules and Placement of Pricing Information...

  12. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  13. Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications...

    Office of Scientific and Technical Information (OSTI)

    Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications Citation Details In-Document Search Title: Linux Kernel Co-Scheduling For Bulk Synchronous Parallel ...

  14. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...

    Broader source: Energy.gov (indexed) [DOE]

    Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADM 6...

  15. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a...

  16. BTO Catalyst Seeks Entries, Webinars and Jamathons Scheduled...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalyst Seeks Entries, Webinars and Jamathons Scheduled BTO Catalyst Seeks Entries, Webinars and Jamathons Scheduled July 20, 2015 - 1:29pm Addthis This funding opportunity is ...

  17. AP-3-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American ... American Electric Power Service Corporation (hereinafter called the Company), PJM ...

  18. AP-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American ... American Electric Power Service Corporation (hereinafter called the Company), the ...

  19. AP-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American ... American Electric Power Service Corporation (hereinafter called the Company), the ...

  20. AP-4-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American ... of American Electric Power Service Corporation (hereinafter called the Company) and ...

  1. ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS | Department of Energy activities. Many of these records have continuing historical value after they are no longer of use to the Department. This records schedule covers only disposable records

  2. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  3. Transforming PV Installations toward Dispatchable, Schedulable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solutions | Department of Energy Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Transforming PV Installations toward Dispatchable, Schedulable Energy Solutions Advanced Energy logo.png Advanced Energy (AE) will address three important needs in the further deployment of photovoltaic (PV) systems: 1) demonstrating and commercializing a new anti-islanding method utilizing Phasor Measurement Units (PMUs), 2) demonstrating a set of advanced grid support

  4. Undergraduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an

  5. 5.0 Project Schedules and Milestones

    Office of Legacy Management (LM)

    ( 5.0 Project Schedules and Milestones (FY 2013-2015) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the Site Management Plan (SMP) establishes the overall plan for remedial actions at the Monticello Mill Tailings Site (MMTS) and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the Monticello Vicinity Properties site (MVP), which was deleted from the National Priorities List (NPL) on February 28,

  6. Measurement Control Workshop Instructional Materials

    SciTech Connect (OSTI)

    Gibbs, Philip; Crawford, Cary; McGinnis, Brent

    2014-04-01

    A workshop to teach the essential elements of an effective nuclear materials control and accountability (MC&A) programs are outlined, along with the modes of Instruction, and the roles and responsibilities of participants in the workshop.

  7. ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business PDF icon ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1)

  8. ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable officers' returns and related records, including records under the cognizance of the General Accountability Office (GAO). PDF icon ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS Accountable

  9. Earth Week 2015 Schedule of Events | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Earth Week 2015 Schedule of Events Earth Week 2015 Schedule of Events Schedule of Events for Energy Department Earth Week 2015 PDF icon doe_earth_day_2015_schedule.pdf More Documents & Publications DOE Headquarters Earth Day 2015 2015 DOE Earth Day Reference Materials Customer Services Handbook, 2010, Office of Administration

  10. PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) This document lists the procedures for preparing records inventory and disposition schedules PDF icon PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) More Documents & Publications DOE F 1324.10 Computer System Retirement Guidelines DOE F 1324.9

  11. DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS | Department of Energy

    Energy Savers [EERE]

    RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS This schedule provides for the disposition of U.S. Department of Energy (DOE) records created to comply with or needed to support compliance with Federal environmental laws and implementing regulation PDF icon DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS Security, Emergency Planning &

  12. Professional Skills Program Course Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Learning and Workforce Development » Learning » Professional Skills and Technical Training » Professional Skills Program Course Schedule Professional Skills Program Course Schedule Professional Skills Program Training Schedule lists all courses that are offered to DOE program offices, field sites, and national laboratories. (Schedule is updated on a quarterly basis) PDF icon Professional Skills Program Course Schedule More Documents & Publications Agenda for the December

  13. SOCO-3-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be

  14. Santee-1-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable

  15. Santee-3-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and

  16. Audit/Investigative Records Schedule (Revision 2) | Department of Energy

    Energy Savers [EERE]

    Audit/Investigative Records Schedule (Revision 2) Audit/Investigative Records Schedule (Revision 2) This schedule covers both records associated with investigations other than those performed by the Office of the Inspector General (OIG) as well as records created by the Department's OIG investigations. PDF icon Audit/Investigative Records Schedule (Revision 2) More Documents & Publications Audit/Investigation Records ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND

  17. Pump-2 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2 Wholesale Power Rate Schedule Pump-2 Wholesale Power Rate Schedule Area: Carters & Russell Pumping-Self Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom

  18. Duke-1-E Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-E Wholesale Power Rate Schedule Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable

  19. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the Department of records relating to space and maintenance, except as indicated below. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 12:

  20. ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Revision 2) | Department of Energy 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the movement of goods and persons under Government orders. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6:

  1. Duke-3-E Wholesale Power Rate Schedule | Department of Energy

    Office of Environmental Management (EM)

    3-E Wholesale Power Rate Schedule Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale

  2. Duke-4-E Wholesale Power Rate Schedule | Department of Energy

    Office of Environmental Management (EM)

    4-E Wholesale Power Rate Schedule Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and

  3. Fault-tolerant dynamic task graph scheduling

    SciTech Connect (OSTI)

    Kurt, Mehmet C.; Krishnamoorthy, Sriram; Agrawal, Kunal; Agrawal, Gagan

    2014-11-16

    In this paper, we present an approach to fault tolerant execution of dynamic task graphs scheduled using work stealing. In particular, we focus on selective and localized recovery of tasks in the presence of soft faults. We elicit from the user the basic task graph structure in terms of successor and predecessor relationships. The work stealing-based algorithm to schedule such a task graph is augmented to enable recovery when the data and meta-data associated with a task get corrupted. We use this redundancy, and the knowledge of the task graph structure, to selectively recover from faults with low space and time overheads. We show that the fault tolerant design retains the essential properties of the underlying work stealing-based task scheduling algorithm, and that the fault tolerant execution is asymptotically optimal when task re-execution is taken into account. Experimental evaluation demonstrates the low cost of recovery under various fault scenarios.

  4. Graduate Program Time Limits and Work Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-0987 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's

  5. Daily Flight Planning and Operations Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Daily Flight Planning and Operations Schedule The following flight planning and operations activities will be carried out for each flight of the G-1 and King Air aircraft. These activities are listed separately from preparation of scientific instruments, for which a similar schedule is being developed. Day prior to flight 4PM - Weather briefing. Forecast to focus on o cloud formation: yes/no o Timing for convection to start: before or after 12PM CDT o Degree of convection: shallow or deep o

  6. High School Schedule | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule January 23, 2016 SCHEDULE Location: Engineering Building, Iowa State University campus, Ames, Iowa 7:30 a.m. Registration and Continental Breakfast, Hoover Hall atrium 8:00 a.m. Opening Ceremonies, 2055 Hoover Hall 8:30-11:00 Round-Robin competition (Hoover, Howe & Pearson Halls) 11:00 Announcements, 2055 Hoover Hall 11:15 Tie-breaker round if needed 11:30 - 12:30 Lunch (Union Drive Community Center - tickets provided) 12:30-4:30 p.m. Double-elimination competition (Howe and Hoover

  7. Weekly Natural Gas Storage Report Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 12/31/2014 Wednesday 12:00 p.m. 1/1/2015 (Thursday) is New Year's Day 11/13/2015 Friday 10:30 a.m. 11/11/2015 (Wednesday) is Veteran's Day 11/25/2015 Wednesday 12:00 p.m. 11/26/2015 (Thursday) is Thanksgiving Day 11/23/2016

  8. Programmatic Records Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Records Schedules Programmatic Records Schedules TITLE DATE LAST CHANGED AUTHORIZATION NUMBER Canceled Checks Issued by Contractors 11/01/96 N1-434-97-2 Environmental Records 8/25/03 N1-434-98-28, N1-434-00-7, N1-434-01-2 Health Compensation Programs 5/01/13 DAA-0434-2013-0001 Loan Program Office (LPO) Records 3/26/15 DAA-0434-2015-0001 Nuclear Weapon Records 2/09/01 N1-434-96-5 Radiographs of Components, Assemblies and Subassemblies of Nuclear Weapon Systems 2/09/01 N1-434-87-1

  9. NDOT Over Dimensional Permits Instruction 1-08 | Open Energy...

    Open Energy Info (EERE)

    library PermittingRegulatory Guidance - Instructions: NDOT Over Dimensional Permits Instruction 1-08PermittingRegulatory GuidanceInstructions Abstract The purpose of this...

  10. NDOT Over Dimensional Permits Instruction 6-07 | Open Energy...

    Open Energy Info (EERE)

    library PermittingRegulatory Guidance - Instructions: NDOT Over Dimensional Permits Instruction 6-07PermittingRegulatory GuidanceInstructions Abstract The purpose of this...

  11. Instructions for using HSPD-12 Authenticated Outlook Web Access...

    Energy Savers [EERE]

    Instructions for using HSPD-12 Authenticated Outlook Web Access (OWA) Instructions for using HSPD-12 Authenticated Outlook Web Access (OWA) Provides instructions for remote Outlook...

  12. Instructions for the Supporting Statement

    Energy Savers [EERE]

    C:\Documents and Settings\loganla\Local Settings\Temporary Internet Files\Content.Outlook\UZP4FQGA\Instructions for the Supporting Statementrev-includes BH table.doc General Instructions A Supporting Statement must accompany each request for approval of a collection of information. The Supporting Statement must be prepared in the format described below. If an item is not applicable, provide a brief explanation. When Item 17 of the OMB 83-I is checked "YES", Section B of the Supporting

  13. Proposal Submittal and Scheduling Procedures for Macromolecular

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crystallography | Stanford Synchrotron Radiation Lightsource Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal

  14. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    SciTech Connect (OSTI)

    Cardoso, Goncalo; Stadler, Michael; Bozchalui, Mohammed C.; Sharma, Ratnesh; Marnay, Chris; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  15. ARM - Instructions for Submitting Extended Abstracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govPublicationsScience Team Meeting ProceedingsInstructions for Submitting Extended Abstracts Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Instructions for Submitting Extended Abstracts Following are instructions for submitting extended

  16. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit...

  17. Utah Water Rights Fee Schedule | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Water Rights Fee Schedule Abstract Water rights fee schedule based on amount appropriated....

  18. Section L: Instructions, Conditions, and Notices to Offerors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IV REPRESENTATIONS AND INSTRUCTIONS SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS Request for Proposal #DE-RFP-07GO97036 PART IV REPRESENTATIONS AND INSTRUCTIONS SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS TABLE OF CONTENTS L.1 FAR 52.215-1 Instructions To Offerors - Competitive Acquisition (Jan 2004).......................................................................................................................... 1 L.2 Proposal Preparation Instructions -

  19. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION

    Broader source: Energy.gov (indexed) [DOE]

    RECORDS-Revision 2 | Department of Energy Payrolling and pay administration records pertain to the disbursements employees receivein return for their personal services. This schedule covers commonly used pay records. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADM

  20. EM Quality Assurance Assessment Schedule FY 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Quality Assurance Assessment Schedule FY 2010 EM Quality Assurance Assessment Schedule FY 2010 Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the remainder of fiscal year (FY) 2010. PDF icon EM Quality Assurance Assessment Schedule FY 2010 More Documents & Publications Line Management Understanding of QA and Oversight SOPP-43, EM-23 Quality Assurance Oversight QA Corporate Board Meeting - February 2011

  1. Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications Citation Details In-Document Search Title: Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications This paper describes a kernel scheduling algorithm that is based on co-scheduling principles and that is intended for parallel applications running on 1000 cores or more where inter-node scalability is key. Experimental results for a Linux implementation on a Cray XT5 machine are

  2. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy : PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS Payrolling and pay administration records pertain to the disbursements employees receive in return for their personal services. This schedule covers commonly used pay records PDF icon ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION

  3. Replacement-2-A Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of

  4. VA-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-B Wholesale Power Rate Schedule VA-1-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection

  5. VA-3-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-B Wholesale Power Rate Schedule VA-3-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter

  6. VA-4-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at

  7. VANC-1 Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VANC-1 Wholesale Power Rate Schedule VANC-1 Wholesale Power Rate Schedule This rate schedule shall be available to public bodies and cooperatives or their agents (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom transmission is provided from the PJM Interconnection LLC (hereinafter called PJM) or Carolina Power & Light Company (hereinafter called CP&L). This rate schedule shall be applicable to transmission services provided and sold under

  8. CBR-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers Electric Corporation and includes the City of Henderson, Kentucky. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called

  9. CC-1-I Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J.

  10. CEK-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CEK-1-H Wholesale Power Rate Schedule CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU This rate schedule shall be available to East Kentucky Power Cooperative (hereinafter called the Customer). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland

  11. CK-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CK-1-H Wholesale Power Rate Schedule CK-1-H Wholesale Power Rate Schedule Area: Kentucky Utilities System: CU This rate schedule shall be available to public bodies served through the facilities of Kentucky Utilities Company, (hereinafter called the Customers.) This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being

  12. CM-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such

  13. CSI-1-H Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CSI-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland

  14. Regulation-1 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Regulation-1 Wholesale Power Rate Schedule Regulation-1 Wholesale Power Rate Schedule Area: Regulation Services System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom service is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale of

  15. Replacement-1 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at

  16. SOCO-1-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated

  17. SOCO-4-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the

  18. Santee-2-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and

  19. Santee-4-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy

  20. Professional Skills and Technical Training Schedule | Department of Energy

    Energy Savers [EERE]

    Services » Learning and Workforce Development » Learning » Professional Skills and Technical Training » Professional Skills and Technical Training Schedule Professional Skills and Technical Training Schedule Professional Skills and Technical Training Schedule lists all courses that are offered to DOE program offices, field sites, and national laboratories. PDF icon 2016 Professional Skills and Technical Training Schedule More Documents & Publications Customer Services Handbook, 2010,

  1. Pump-1-A Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-A Wholesale Power Rate Schedule Pump-1-A Wholesale Power Rate Schedule Area: Carters & Russell Pumping System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at

  2. 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Procurement Evaluation and Re-engineering Team (PERT) Schedule 2015 Procurement Evaluation and Re-engineering Team (PERT) Schedule PDF icon PERT Schedule 2015.pdf More Documents & Publications Policy Flash 2013-21 Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle Policy Flash 2013-65 Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Flash 2013-65

  3. ALA-1-N Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between

  4. DOE HQ Shuttle Bus Schedule and Route | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. The shuttle bus departure and arrival times may be impacted by traffic, weather, or other logistical interruptions.

  5. JW-1-J Wholesale Power Rate Schedule | Department of Energy

    Office of Environmental Management (EM)

    JW-1-J Wholesale Power Rate Schedule JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff This rate schedule shall be available to public bodies and cooperatives served by the Progress Energy Florida and having points of delivery within 150 miles of the Jim Woodruff Project (hereinafter called the Project). This rate schedule shall be applicable to firm power and accompanying energy made available by the Government from the Project and sold in wholesale

  6. MISS-1-N Wholesale Power Rate Schedule | Department of Energy

    Office of Environmental Management (EM)

    MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of

  7. ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...

    Broader source: Energy.gov (indexed) [DOE]

    and administration of management improvement programs. ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES More Documents & Publications Administrative Management...

  8. Schedules of Key Environmental Impact Statements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schedules of Key Environmental Impact Statements Schedules of Key Environmental Impact Statements This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly). This chart represents anticipated activity and is not a commitment for documentation or date. Last Revised: 12/15/2015 Download Document PDF icon Schedules of Key Environmental Impact Statements (December 2015) More Documents & Publications

  9. Duke-2-E Wholesale Power Rate Schedule | Department of Energy

    Office of Environmental Management (EM)

    2-E Wholesale Power Rate Schedule Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling

  10. Advanced Technology System Scheduling Governance Model

    SciTech Connect (OSTI)

    Ang, Jim; Carnes, Brian; Hoang, Thuc; Vigil, Manuel

    2015-06-11

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. The process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).

  11. Security Improvements Project Completed Ahead of Schedule, $20 Million

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Field Offices / Welcome to the NNSA Production Office / NPO News Releases / Security Improvements Project Completed Ahead of Schedule, ... Security Improvements Project Completed Ahead of Schedule, $20 Million Under Budget The National Nuclear Security Administration's (NNSA) Security Improvements Project (SIP) was recently completed ahead of schedule and approximately $20 million under its original budget of $72 million.

  12. Schedule and Information for Small Business Innovation Research and Small

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Technology Transfer Program Applicants | Department of Energy Schedule and Information for Small Business Innovation Research and Small Business Technology Transfer Program Applicants Schedule and Information for Small Business Innovation Research and Small Business Technology Transfer Program Applicants The funding, outreach, and award schedule for upcoming Office of Energy Efficiency and Renewable Energy (EERE) Small Business Innovation Research (SBIR) and Small Business

  13. Proposal Submittal and Scheduling Procedures Entry Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Submittal and Scheduling Procedures for Research at SSRL X-ray/VUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy Sciences under contract DE-AC03-76SF00515. The SSRL Structural Molecular Biology Program is supported by the Department of Energy, Office of Biological and Environmental Research, the National Institutes of Health, National Center for Research Resources, Biomedical Technology Program, and the National Institute of General

  14. Microsoft Word - May-meeting-schedule-public

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meeting May 15, 2012 Meeting schedule: 08:00 - 0:830 - Welcome and introductions - Don G., Robert T. and subcommittee members 08:30 - 0:915 - Mission, Vision, and Research - T. Hallman 09:15 - 10:05 - Facilities and Initiative - J. Gillo 10:05 am - 10:30 - Break 10:30 am - 11:15 - NSF Program and Budget - B. Keister 11:15 - 15:00 - Subcommittee Discussion

  15. DOE Announces New WIPP Tour Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Announces New WIPP Tour Schedule CARLSBAD, N.M., March 14, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced changes in the public tour program at the Waste Isolation Pilot Plant (WIPP). Public tours of WIPP's surface and underground are now offered on Tuesdays and Wednesdays. Previously, tours took place throughout the week. The decision to reduce the number of tours is based on safety and waste handling requirements as WIPP approaches full-scale operations.

  16. the-schedule-based-transit-model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Schedule-Based transit model of the Chicago Metropolitan Area Vadim Sokolov Transportation Research and Analysis Computing Center Argonne National Laboratory List of Authors ================ Vadim Sokolov Transportation Research and Analysis Computing Center Argonne National Laboratory 277 International Drive West Chicago, IL 60185 Abstract ========= Usually public transit systems are modeled using so called frequency based approach. In this case transit route times are defined in terms of

  17. Expanding Your Horizons scheduled for March 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expanding Your Horizons Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:Mar. 2016 all issues All Issues » submit Expanding Your Horizons scheduled for March 2 The conference offers fifth- to 12th-grade girls opportunities to participate in hands-on workshops about science, technology, engineering, math and related fields. February 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email Community Programs Office Kurt

  18. Jefferson Lab Visitor's Center - Schedule a Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Map Virtual Tour Schedule a Tour Newport News Resources Places to Visit Tourist Attractions Restaurants Climate and Weather Tour Safety Jefferson Lab Environmental, Health & Safety Manual Chapter 3230: Communication of Hazards to Visitors Jefferson Lab is classified as a low-hazard facility. This means the hazards encountered here are comparable to those typically found in an industrial setting. There are a few places on-site where minimal personal protective equipment (PPE) is

  19. Recruitment Schedule | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Recruitment Schedule | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at

  20. Work Schedules | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Work Schedules | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA

  1. PURPOSE FORM INSTRUCTIONS Item Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PURPOSE FORM INSTRUCTIONS Item Description 1 Enter inclusive dates of current reporting period. 2 Enter the official contract title. 3 Enter the official contract number. 4 Enter the name and address of each subcontractor. Subcontractors are to be grouped by state. 5 Enter ZIP code plus the 4-digit ZIP code extension. 6 Enter the subcontractor's business type (i.e. Academia, Industry, National Lab, Non-Profit Organization, State, or Other). 7 Enter the subcontractor's business classification

  2. Generating and executing programs for a floating point single instruction

    Office of Scientific and Technical Information (OSTI)

    multiple data instruction set architecture (Patent) | SciTech Connect Generating and executing programs for a floating point single instruction multiple data instruction set architecture Citation Details In-Document Search Title: Generating and executing programs for a floating point single instruction multiple data instruction set architecture Mechanisms for generating and executing programs for a floating point (FP) only single instruction multiple data (SIMD) instruction set architecture

  3. Botas line repaired ahead of schedule

    SciTech Connect (OSTI)

    Not Available

    1991-11-01

    This paper reports on damaged sections of Botas' dual 30-in. gas line carrying USSR gas across the Marmara Sea to Turkey that were replaced 30 days ahead of contract schedule. Tefken Construction and Installation Co., Inc., Istanbul, working under a $4-million contract, replaced two sections on one of the dual lines near Ambarli, Turkey, within a two-month period. The offshore system stretches 33-mi under the Marmara Sea with some pipe laid at 262-ft maximum water depths. The scope of the project was to replace a 426-ft offshore approach to the northern shoreline and a 984-ft onshore section, which were damaged by a submarine landslide.

  4. Middle School Schedule | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule Saturday, February 20, 2016 (Iowa State University campus, Ames, Iowa) 7:30 - Registration and continental breakfast (Room 1002 Gilman Hall) 8:00 - Welcome & Announcements (Room 1002 Gilman Hall) 8:30 - Practice Rounds (TASF, Gilman, Spedding and Hach Halls) 9:30 - Round Robin (TASF, Gilman, Spedding and Hach Halls) 11:00 - Tie Breaker (if needed) 11:20 - LUNCH (Union Drive Dining Center - free for coaches, teams and volunteers) 12:30 - Double Elimination (top 12 teams determined by

  5. HANFORD ADVISORY BOARD DRAFT 2013 MEETING SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 MEETING SCHEDULE Updated December 10, 2012 MEETING DATE LOCATION PHONE NUMBER # GUEST ROOMS RESERVED SHUTTLE SERVICE February 7-8, 2013 Red Lion Hanford House 802 George Washington Way Richland, Washington Phone: 509-946-7611 1-800-733-5466 Fax: (509) 943-8564 15 Rooms @ $93 For Feb 6 & 7 Reserve by Jan 6 YES April 4-5, 2013 Red Lion Columbia Center 1101 N. Columbia Center Blvd Kennewick, WA Phone: 509-783-0611 1-800-733-5466 15 Rooms @ $93 For Apr 3 & 4 Reserve by Mar 3 YES June

  6. This document is scheduled to be published

    Energy Savers [EERE]

    document is scheduled to be published in the Federal Register on 08/21/2015 and available online at http://federalregister.gov/a/2015-20742, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission LNG Development Company, LLC Docket Nos. CP09-6-001 Oregon Pipeline Company, LLC CP09-7-001 Northwest Pipeline LLC Docket No. CP13-507-000 NOTICE OF PUBLIC MEETINGS FOR COMMENTS ON THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE OREGON LNG TERMINAL AND

  7. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 value in eV 2 sin 2 2 e,max (90% CL): upper limit in sin 2 2 e , at 90% confidence level sin 2 2 e,max (3 CL): upper limit in sin 2 2 e , at 3 confidence...

  8. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    have a test version ready, they can bring it up for a wind test. Blast it with the hair dryer and count how many turns it makes in 30 seconds. Or, see if it can turn with enough...

  9. INSTRUCTIONS

    Broader source: Energy.gov (indexed) [DOE]

    and design support","construction oversight and management","quality assurance","environment, safety, and health","finance and administration","safeguards and...

  10. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    neutrino oscillation fits MiniBooNE Collaboration (Dated: May 2009) The May 2009 dataset reflects the different fit method involved in the up- dated analysis, which simultaneously fits to ν e and ν µ event distributions when looking for a ν µ → ν e oscillation signal. Any signal prediction assumed during the fit does not affect the ν µ event distribution; the ν µ sample is only used in the fit in order to constrain the ν e prediction in fitting for ν µ → ν e oscillations, by

  11. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2007 MiniBooNE public data for muon-to-electron neutrino oscillation fits MiniBooNE collaboration (Dated: April 2007) I. MINIBOONE PUBLIC DATA, AND NOTATION The following MiniBooNE information is made publicly available: * ntuple file of official MiniBooNE sin 2 2θ µe sensitivity and upper limit curves as a function of ∆m 2 , for a 2-neutrino ν µ → ν e oscillation fit. There are 100 rows in the file, one per ∆m 2 grid point, and five columns: ∆m 2 : ∆m 2 value in eV 2 sin 2

  12. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    antineutrino oscillation fits MiniBooNE Collaboration (Dated: May 2009) The May 2009 dataset reflects the different fit method involved in the an- tineutrino analysis, which mirrors the updated neutrino analysis. This method simultaneously fits to ¯ ν e and ¯ ν µ event distributions when looking for a ¯ ν µ → ¯ ν e oscillation signal. Any signal prediction assumed during the fit does not af- fect the ¯ ν µ event distribution; the ¯ ν µ sample is only used in the fit in order to

  13. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is made publicly available for the updated electron antineutrino appearance analysis: * 1D array of electron antineutrino bin boundaries in E QE (reconstructed...

  14. Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information is made publicly available for the updated electron neutrino appearance analysis: * 1D array of electron neutrino bin boundaries in E QE (reconstructed neutrino...

  15. Safety System Oversight Staffing Analysis (Instructions, Blank...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety System Oversight Staffing Analysis (Instructions, Blank Sheet and Example Sheet) This Staffing Analysis calculation is completed using an Excel worksheet. Information ...

  16. Form EIA-860 Instructions | Open Energy Information

    Open Energy Info (EERE)

    plants with instructions on completing Form EIA-860. The U.S. Energy Information Administration (EIA) requires certain developers of electric generating plants (meeting defined...

  17. Workplace Charging Toolkit: Workshop Speaker Instruction Letter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workplace Charging Toolkit: Workshop Speaker Instruction Letter Template Inform speakers participating in the employer experience panel about their role in the event. File General ...

  18. Microsoft Word - Instructions Upon Arrival.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EFCOG ELECTRICAL SAFETY WORKSHOP ARRIVAL INSTRUCTIONS MAIN GATE SECURITY & PARKING The top two (2) floors of the parking garage usually have the best availability. Upon arrival...

  19. EIA-782A Exclusionary list instructions

    U.S. Energy Information Administration (EIA) Indexed Site

    ... | EIA-782A Exclusionary list instructions 4 EIA-782A Exclusionary List (cont.) January 2016 + Martin Gas Plains Marketing Canada + Martin Operating Partnership Plains ...

  20. EIA-782C Exclusionary list instructions

    U.S. Energy Information Administration (EIA) Indexed Site

    ... list instructions 4 EIA-782C Exclusionary List (cont.) January 2016 ENI Trading & Shipping General Petroleum Enjet (Apex) Geo Gas Enlink NGL Marketing George E. Warren ...

  1. Instructions for Grant and Loan Recipients | Department of Energy

    Office of Environmental Management (EM)

    Instructions for Grant and Loan Recipients Instructions for Grant and Loan Recipients DOE Supplemental Instructions for OMB Section 1512 Quarterly reporting through FederalReporting.gov for Grant and Loan Recipients PDF icon 1512_Instructions_Grant_and_Loan.pdf More Documents & Publications DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients Slide 1 Slide 1

  2. Appliance Standards Program Schedule - CCE Overview and Update, dated

    Office of Environmental Management (EM)

    October 26, 2011 | Department of Energy dated October 26, 2011 Appliance Standards Program Schedule - CCE Overview and Update, dated October 26, 2011 This document is Appliance Standards Program Schedule & CCE Overview and Update presentation, dated 10/26/2011, presented to Energy-Efficiency Advocacy Groups PDF icon doe_eeag_present2011.pdf More Documents & Publications Appliance Standards Program Schedule - CCE Overview and Update, presented at AHRI 2011 Annual Meeting, dated

  3. Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism Citation Details In-Document Search Title: Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism This paper describes a kernel scheduling algorithm that is based on coscheduling principles and that is intended for parallel applications running on 1000 cores or more. Experimental results for a Linux implementation on a Cray XT5 machine are presented. The results indicate that Linux is a suitable

  4. Department Sets Aggressive Schedule for New Appliance Standards |

    Energy Savers [EERE]

    Department of Energy Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy

  5. Replacement-3 Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Wholesale Power Rate Schedule Replacement-3 Wholesale Power Rate Schedule Area: Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky, southern Illinois System: CU This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the Government and the

  6. Descriptions of ESPC Task Order Schedules and Placement of Pricing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information (IDIQ Attachment J-5) | Department of Energy Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Document provides task order schedule descriptions and information on the placement of pricing for energy savings performance contracts (ESPCs). PDF icon 5_4_descriptionoftoschedules_j5.pdf More Documents & Publications ESPC Task

  7. VA-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC

  8. Security Improvements Project Completed Ahead of Schedule, $20 Million

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Library / Press Releases / Security Improvements Project Completed Ahead of Schedule, ... Security Improvements Project Completed Ahead of Schedule, $20 Million Under Budget Press Release Apr 7, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Security Improvements Project (SIP) was recently completed ahead of schedule and approximately $20 million under its original budget of $72 million. SIP upgraded

  9. SOCO-2-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate

  10. ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Revision 2) | Department of Energy 3: RECORDS COMMON TO MOST OFFICES (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES (Revision 2) This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES

  11. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (SUPERSEDED) | Department of Energy 2: PAYROLL AND PAY ADMINISTRATION RECORDS (SUPERSEDED) ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS (SUPERSEDED) Payrolling and pay administration records pertain to the disbursements employees receivein return for their personal services. This schedule covers commonly used pay records. PDF icon Administrative Records Schedule 2-Payroll and Pay Administration Records.pdf More Documents & Publications ADMINISTRATIVE RECORDS

  12. ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and personal property surplus to the needs of the Government. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) More Documents & Publications PROPERTY DISPOSAL RECORDS ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3:

  13. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...

    Office of Environmental Management (EM)

    records pertain to the disbursements employees receivein return for their personal services. This schedule covers commonly used pay records. PDF icon Administrative...

  14. ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...

    Office of Environmental Management (EM)

    records pertain to the disbursements employees receive in return for their personal services. This schedule covers commonly used pay records PDF icon ADMINISTRATIVE...

  15. Optimal Scheduling of In-situ Analysis Workflows and Independent...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimal Scheduling of In-situ Analysis Workflows and Independent Parallel IO Streams for Large-scale Scientific Simulations Event Sponsor: Argonne Leadership Computing Facility...

  16. Exhibit D: Mirant Potomac River Schedule of Operations: January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River...

  17. Domestic Hot Water Event Schedule Generator - Energy Innovation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Efficiency Building Energy Efficiency Find More Like This Return to Search Domestic Hot Water Event Schedule Generator National Renewable Energy Laboratory Contact NREL About This...

  18. ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT...

    Office of Environmental Management (EM)

    3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of...

  19. Sec. Moniz to Georgia, Energy Department Scheduled to Close on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Nuclear Power Plant Reactors Sec. Moniz to Georgia, Energy Department Scheduled to Close on Loan Guarantees to Construct New Nuclear Power Plant Reactors February 19, 2014 - ...

  20. Research Forum Schedule-Research-PHaSe-EFRC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Forum Schedule PHaSE Research Fora and Talks This webpage is provided for legacy archive purposes only, as of 30 April 2015.

  1. Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading...

  2. Maximizing productivity & profitability through best cost shift schedules

    SciTech Connect (OSTI)

    Coleman, R.

    1996-12-31

    If you have the right equipment and employees at the right place, the fight time, and the right cost, you have the perfect business schedule. But, if you`re like most mines, you can probably improve your schedule, improvements that will reach all the way to the bottom line. And unlike adding employees, materials, or capital equipment, better scheduling is a cost-free way improve profitability. A good schedule can save millions. A bad schedule will cost money every year. A shift schedule is not a day off pattern or shift length. A shift schedule is a complete system deploying personnel and capital equipment. Most mining schedules are either copied from another operation, based on tradition or the result of a contract negotiation made far from the mine site. Unfortunately, most mine managers don`t give much thought to schedules until a crisis develops; at which point the tendency is to implement the first solution that comes along as quickly as possible. Costly mistakes are made.

  3. SSRL Experimental Run Schedule | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experimental Run Schedule November 2015- May 2016 Schedules for X-ray, VUV and Macromolecular Crystallography beamlines. X-ray VUV (BL5, 8, 10-1, 13-1/2/3) Macromolecular Crystallography see also: Support Staff Schedule SPEAR3 Operating / Maintenance LCLS see Schedule Archive The SSRL storage ring team is in the final stages of installing hardware that will enable reducing the SPEAR3 emittance to 6 nm from its present value of 10 nm. The last piece is the installation of the thin septum

  4. Appliance Standards Program Schedule - CCE Overview and Update...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOPR Nov-2011 Metal Halide Lamp Fixtures NOPR Nov-2011 Microwave Ovens SNOPR Nov-2011 ERBR Incandescent Reflector Lamps NOPR Nov-2011 Next Scheduled Document for Active DOE ...

  5. ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and ...

  6. Pantex Plant Achieves Key Safety Milestone Ahead of Schedule...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Achieves Key Safety Milestone Ahead of Schedule | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  7. Appliance Standards Program Schedule - CCE Overview and Update...

    Broader source: Energy.gov (indexed) [DOE]

    Program Schedule & CCE Overview and Update presentation, dated 10262011, presented to Energy-Efficiency Advocacy Groups doeeeagpresent2011.pdf More Documents & Publications...

  8. Appliance Standards Program Schedule - CCE Overview and Update...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13, 2011 Appliance Standards Program Schedule - CCE Overview and Update, dated October 26, 2011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 0524...

  9. United States Forest Service - Forest Service Schedule of Proposed...

    Open Energy Info (EERE)

    Actions Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service Schedule of Proposed Actions Abstract The...

  10. Reserving and Scheduling Transmission over the Time Change -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reserving & Scheduling Transmission over the Time Change Posted Date: 10...

  11. Reminder Reserving and Scheduling Transmission over the Time...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reminder - Reserving & Scheduling Transmission over the Time Change...

  12. Reserving and Scheduling Transmission over the Time Change -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reserving & Scheduling Transmission over the Time Change Reminder Posted...

  13. Reserving and Scheduling Transmission over the Time Change -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reserving & Scheduling Transmission over the Time Change Posted Date: 2...

  14. Arizona Right-of-Way Instruction Sheet | Open Energy Information

    Open Energy Info (EERE)

    Right-of-Way Instruction Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Arizona Right-of-Way Instruction...

  15. Instructions for EM Corporate Performance Metrics | Department of Energy

    Energy Savers [EERE]

    Instructions for EM Corporate Performance Metrics Instructions for EM Corporate Performance Metrics Quality Program Criteria PDF icon Instructions for EM Corporate Performance Metrics More Documents & Publications EM Corporate QA Performance Metrics CPMS Tables QA Corporate Board Meeting - July 2008

  16. EXPO 2014 Exhibitor Information Exhibitor Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Attachment 1 EXPO 2014 Exhibitor Information Exhibitor Schedule Exhibitor set up Monday, May 12 7:00 a.m. to 4:00 p.m. EXPO exhibitor hours Tuesday, May 13 7:00 a.m. to 7:00 p.m. Wednesday, May 14 7:00 a.m. to 7:00 p.m. Exhibit removal Wednesday, May 14 7:00 p.m. to 8:00 p.m. Thursday, May 15 7:00 a.m. to 9:00 a.m. Standard 10' x 10' exhibitor booths are free of charge* and include one skirted table and two chairs. *Charges will be assessed for booth phone service or any electrical needs in

  17. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A.; Kumar, Sameer; Parker, Jeffrey J.

    2014-07-01

    Completion processing of data communications instructions in a distributed computing environment with computers coupled for data communications through communications adapters and an active messaging interface (`AMI`), injecting for data communications instructions into slots in an injection FIFO buffer a transfer descriptor, at least some of the instructions specifying callback functions; injecting a completion descriptor for each instruction that specifies a callback function into an injection FIFO buffer slot having a corresponding slot in a pending callback list; listing in the pending callback list callback functions specified by data communications instructions; processing each descriptor in the injection FIFO buffer, setting a bit in a completion bit mask corresponding to the slot in the FIFO where the completion descriptor was injected; and calling by the AMI any callback functions in the pending callback list as indicated by set bits in the completion bit mask.

  18. Instructional video + video + GRR + presentations | OpenEI Community

    Open Energy Info (EERE)

    Instructional video + video + GRR + presentations Home Kyoung's picture Submitted by Kyoung(150) Contributor 17 July, 2012 - 09:35 GRR Informational Presentations Instructional...

  19. POLICY BULLETIN: POL-5- Declassification Instruction "25X1-human"

    Broader source: Energy.gov [DOE]

    Provides instructions on the appropriate action to take when classification guide topics or source documents cite "25X1-human" declassification instructions.

  20. Optimized scalar promotion with load and splat SIMD instructions...

    Office of Scientific and Technical Information (OSTI)

    splat SIMD instructions Mechanisms for optimizing scalar code executed on a single instruction multiple data (SIMD) engine are provided. Placement of vector operation-splat...

  1. BLM - Instruction Memorandum No. 2009-167 | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: BLM - Instruction Memorandum No. 2009-167 Abstract This instruction memorandum emphasizes the...

  2. Attachment 3: Instructions for Use of Green Lease Solicitation...

    Energy Savers [EERE]

    Attachment 3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart Attachment 3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart...

  3. DOE-L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND

    Office of Environmental Management (EM)

    L. PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND VOLUME I, OFFER AND OTHER DOCUMENTS (a) Instruction - Cover Letter. The cover letter shall include, but not be limited to,...

  4. File Transfer Protocol (FTP) Site Instructions | Open Energy...

    Open Energy Info (EERE)

    Transfer Protocol (FTP) Site Instructions Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: File Transfer Protocol...

  5. File:AlaskaTitleVApplicationSubmittalInstructions.pdf | Open...

    Open Energy Info (EERE)

    AlaskaTitleVApplicationSubmittalInstructions.pdf Jump to: navigation, search File File history File usage File:AlaskaTitleVApplicationSubmittalInstructions.pdf Size of this...

  6. Attachment 3: Instructions for Use of Green Lease Solicitation...

    Office of Environmental Management (EM)

    3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart Attachment 3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart PDF icon ...

  7. ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of procedure, from simple, small purchases to complicated prime contractor and subcontractor operation. PDF icon ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS More Documents & Publications ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE

  8. Balancing Authority Cooperation Concepts - Intra-Hour Scheduling

    SciTech Connect (OSTI)

    Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

    2013-03-29

    The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

  9. Generating and executing programs for a floating point single instruction multiple data instruction set architecture

    DOE Patents [OSTI]

    Gschwind, Michael K

    2013-04-16

    Mechanisms for generating and executing programs for a floating point (FP) only single instruction multiple data (SIMD) instruction set architecture (ISA) are provided. A computer program product comprising a computer recordable medium having a computer readable program recorded thereon is provided. The computer readable program, when executed on a computing device, causes the computing device to receive one or more instructions and execute the one or more instructions using logic in an execution unit of the computing device. The logic implements a floating point (FP) only single instruction multiple data (SIMD) instruction set architecture (ISA), based on data stored in a vector register file of the computing device. The vector register file is configured to store both scalar and floating point values as vectors having a plurality of vector elements.

  10. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A; Kumar, Sameer; Parker, Jeffrey J

    2014-05-20

    Completion processing of data communications instructions in a distributed computing environment, including receiving, in an active messaging interface (`AMI`) data communications instructions, at least one instruction specifying a callback function; injecting into an injection FIFO buffer of a data communication adapter, an injection descriptor, each slot in the injection FIFO buffer having a corresponding slot in a pending callback list; listing in the pending callback list any callback function specified by an instruction, incrementing a pending callback counter for each listed callback function; transferring payload data as per each injection descriptor, incrementing a transfer counter upon completion of each transfer; determining from counter values whether the pending callback list presently includes callback functions whose data transfers have been completed; calling by the AMI any such callback functions from the pending callback list, decrementing the pending callback counter for each callback function called.

  11. Executive Order 13423 Implementing Instructions | Department of Energy

    Office of Environmental Management (EM)

    423 Implementing Instructions Executive Order 13423 Implementing Instructions INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" PDF icon Executive Order 13423 Implementing Instructions More Documents & Publications Implementing Executive Order 13423 Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental,

  12. Instructional Materials | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructional Materials Instructional Materials Solar Energy Learn about the quality of electromagnetic radiation produced by the sun and investigate on how this energy is captured and transferred into usable forms of energy. Explore this process in natural systems, like photosynthetic organisms, as well as manmade systems for producing electricity from sunlight. Download Solar Materials Here | Solar Energy Kit Overview Learning Modules: Kit #1: Spectroradiometry and Chlorophyll Spectroscopy Kit

  13. EIA-782B EXCLUSIONARY LIST INSTRUCTIONS

    Gasoline and Diesel Fuel Update (EIA)

    B EXCLUSIONARY LIST INSTRUCTIONS The 2011 Exclusionary List has been updated for your use in preparing Form EIA-782B, "Resellers'/Retailers'Monthly Petroleum Product Sales Report." As required under the "General Instructions" for this form, respondents are to exclude all sales to refiners and gas plant operators represented on the list. When using this list, please note the following: * Exclude all sales made to companies and their subsidiaries represented on this

  14. Edison is scheduled to move to a new facility building on 11...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled to move to a new facility building on 11302015 Edison is scheduled to move to a new facility building on 11302015 October 29, 2015 Edison is scheduled to be powered...

  15. Hopper scheduled maintenance tomorrow (Sept 19) and /project outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and /project outage Hopper scheduled maintenance tomorrow (Sept 19) and /project outage September 18, 2012 by Helen He There will be a scheduled hardware and software maintenance for Hopper next Wednesday, Sept 19, from 6:30 am to midnight Pacific time. Please plan your work accordingly and check the NERSC Message of the Day (MOTD) for status update: http://www.nersc.gov/live-status/motd/. The /project file system (also known as /global/project) will be

  16. Topic Index to the DOE Administrative Records Disposition Schedules

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    /21/07 TOPICINDEXTODOEADMINSCHEDULES Topic Index to the DOE Administrative Records Disposition Schedules (excluding the GRS Schedules) Topic Schedule Item [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [X] [Y] [Z] A Academic/Outreach Program 1 44 Access Request Files 18 6 Accountable Officers' Files 6 1 Accounting Administrative Files 6 5 Administrative Claims Files 6 10 Administrative Training Records 1 29.2 Administrative Issuances 16 1

  17. FY2016 PMCDP Training Schedule | Department of Energy

    Energy Savers [EERE]

    FY2016 PMCDP Training Schedule FY2016 PMCDP Training Schedule The FY 2016 PMCDP Training Schedule was built using data from the FY16 training needs survey completed by PoCs and SACMs, the strategic survey delivered to DoE's workforce in FAITAS, and historical data. The total number of PMCDP deliveries is consistent with the number of annual deliveries over the past 3 fiscal years, including courses ordered directly by the sites. PMCDP will continue to determine training needs based on input from

  18. Microsoft Word - DOE Records Disposition Schedule Changes3.doc

    Office of Environmental Management (EM)

    6 Changes-to-Schedules REV 3 DOE Administrative Records Schedules Changes Last revised: 12/14/2009 Date DOE Admin Schedule Item(s) Change Authorizing Document 3/02/07 1 10b, 24, 27, 42a-c Added items for Form I-9 (GRS 1, Item 10b), reasonable accommodation records (GRS 1, Item 24), alternative dispute resolution records (GRS 1, item 27), and alternative worksite records (GRS 1, Item 42). Added item numbers for N1 citations. GRS Transmittal No. 11, 12/31/03; GRS Transmittal No. 12, 7/14/04; GRS 1

  19. Ancillary-service details: Dynamic scheduling

    SciTech Connect (OSTI)

    Hirst, E.; Kirby, B.

    1997-01-01

    Dynamic scheduling (DS) is the electronic transfer from one control area to another of the time-varying electricity consumption associated with a load or the time-varying electricity production associated with a generator. Although electric utilities have been using this technique for at least two decades, its use is growing in popularity and importance. This growth is a consequence of the major changes under way in US bulk-power markets, in particular efforts to unbundle generation from transmission and to increase competition among generation providers. DS can promote competition and increase choices. It allows consumers to purchase certain services from entities outside their physical-host area and it allows generators to sell certain services to entities other than their physical host. These services include regulation (following minute-to-minute variations in load) and operating reserves, among others. Such an increase in the number of possible suppliers and customers should encourage innovation and reduce the costs and prices of providing electricity services. The purpose of the project reported here was to collect and analyze data on utility experiences with DS. Chapter 2 provides additional details and examples of the definitions of DS. Chapter 3 explains why DS might be an attractive service that customers and generators, as well as transmission providers, might wan to use. Chapter 4 presents some of the many current DS examples the authors uncovered in their interviews. Chapter 5 discusses the costs and cost-effectiveness of DS. Chapter 6 explains what they believe can and cannot be electronically moved from one control area to another, primarily in terms of the six ancillary services that FERC defined in Order 888. Chapter 7 discusses the need for additional research on DS.

  20. DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Loan Recipients | Department of Energy DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients Instructions for Quarterly reporting through FederalReporting.gov PDF icon DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients More Documents & Publications DOE Supplemental Instructions for OMB Section 1512 Reporting -

  1. EVMS Training Snippet: 5.3 PARSII Analysis: Schedule Health Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 PARSII Analysis: Schedule Health Assessment EVMS Training Snippet: 5.3 PARSII Analysis: Schedule Health Assessment This EVMS Training Snippet, sponsored by the Office of Project ...

  2. Demand charge schedule data | OpenEI Community

    Open Energy Info (EERE)

    Demand charge schedule data Home > Groups > Utility Rate Hi, I'm a new user of this database,so first, thanks for creating it, and apologies if this question is answered in...

  3. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River...

  4. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplement 3, January and February 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006 Docket No. EO-05-01: Exhibit D: Mirant...

  5. Trident schedule FY16 -- rev 11-10-15.xlsx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule FY 2015-16 11102015 28-Sep Material dynamics (gas gun) Loomis na 4 5-Oct 4 12-Oct 3 19-Oct maintenance 4 26-Oct AWE -- DTRA Davis - Sibley South ns 4 2-Nov ...

  6. igure 4. Production Schedules at Two Development Rates for the...

    U.S. Energy Information Administration (EIA) Indexed Site

    4. Production Schedules at Two Development Rates for the Statistical Mean of Recovering 10.3 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of Alaska...

  7. Figure 5. Production Schedules at Two Development Rates for the...

    U.S. Energy Information Administration (EIA) Indexed Site

    5. Production Schedules at Two Development Rates for the 5 Percent Probability of Recovering 16.0 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of...

  8. Figure 3. Production Schedules at Two Development Rates

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Production Schedules at Two Development Rates for the 95 Percent Probability of Recovering 5.7 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of...

  9. _PART I - THE SCHEDULE SECTION B-H

    National Nuclear Security Administration (NNSA)

    to Mod 0108 dated 7/30/15 DE-NA0000622 Section B - H, Page i PART I - THE SCHEDULE TABLE OF CONTENTS SECTION B ............................................................................................................................................................ 1 SUPPLIES OR SERVICES AND PRICES/COSTS .............................................................................................. 1 B-1 SERVICES BEING ACQUIRED

  10. Figure 3. Production Schedules at Two Development Rates

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Production Schedules at Two Development Rates for the 95 Percent Probability of Recovering 5.7 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of Alaska fig3.jpg (32189 bytes)

  11. Center for Nanophase Materials Sciences (CNMS) - Hours & Scheduling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    made in advance. 2016 ORNL Holiday Schedule New Year's Day Friday, January 1 Martin Luther King Jr.'s Birthday Monday, January 18 Good Friday (Easter) Friday, March 25 Memorial...

  12. To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dec. 1-20, 2006 Larry, Regarding the planned line outage, scheduled for Feb. 20 through Mar. 6, I am requesting that the residents near the plant be moved for the duration of the...

  13. Appliance Standards Program Schedule - CCE Overview and Update, presented

    Office of Environmental Management (EM)

    at AHRI 2011 Annual Meeting, dated November 14, 2011 | Department of Energy presented at AHRI 2011 Annual Meeting, dated November 14, 2011 Appliance Standards Program Schedule - CCE Overview and Update, presented at AHRI 2011 Annual Meeting, dated November 14, 2011 This document is the presentation for the Appliance Standards Program Schedule - CCE Overview and Update, presented at AHRI 2011 Annual Meeting on 11/14/ 2011 PDF icon doe_ahri_present2011.pdf More Documents & Publications

  14. EIS-0514: Notice of Schedule Extension | Department of Energy

    Energy Savers [EERE]

    Schedule Extension EIS-0514: Notice of Schedule Extension Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California Western Area Power Administration issued a notice extending the public scoping period for an EIS/EIR that will analyze the potential environmental effects of the proposed new 500-kilovolt Colusa-Sutter (CoSu) Transmission Line Project. The proposed transmission line would interconnect the California-Oregon Transmission Project transmission system,

  15. DOE Announces Yucca Mountain License Application Schedule | Department of

    Energy Savers [EERE]

    Energy Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative

  16. ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SAFETY RECORDS | Department of Energy 8: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS Protection program records include the various files created by the Department to control and protect safeguards and security interests (e.g., classified information, sensitive unclassified information, special nuclear materials, nuclear weapons, other Government property) PDF icon ADMINISTRATIVE RECORDS SCHEDULE 18:

  17. National Labs Commission Phase I Meeting Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Labs Commission Phase I Meeting Schedule National Labs Commission Phase I Meeting Schedule The Commission meets monthly to gather information that will inform its study. Public meetings allow for public participation. Individuals who would like to attend must RSVP to Karen Gibson, Designated Federal Officer (DFO), no later than two business days preceding the meeting date at email crenel@hq.doe.gov. Please provide your name, organization, and contact information. Individuals and

  18. DOE - NNSA/NFO -- Nuclear Testing Archive Fee Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Testing Archive > Fee Schedule NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Nuclear Testing Archive (NTA) Fee Schedule The U.S. Department of Energy National Nuclear Security Administration Nuclear Testing Archive (NTA) is a centralized repository of publicly releasable documents on the subject of the U.S. Nuclear Weapons Testing Program. The Nuclear Testing Archive is operated for the NNSA by NSTec. Normal services provided to the public by the Nuclear Testing

  19. EIA-423 and Schedule 2 of EIA-923

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Historic Form EIA-423 & FERC-423 Detailed Data Beginning in 2008, data on monthly deliveries of fossil fuels to both utility and nonutility generating facilities are collected on Schedule 2 of the newer Form EIA-923 -- See EIA-923 detailed data Schedule 2. Survey form EIA-423 collected monthly nonutility fuel receipts and fuel quality files on plants with a fossil-fueled nameplate generating capacity of 50 or more megawatts. Detailed data are provided here on monthly deliveries of fossil

  20. Hanford Facility Highlights EM's Success in Meeting Cost and Schedule

    Energy Savers [EERE]

    Targets | Department of Energy Facility Highlights EM's Success in Meeting Cost and Schedule Targets Hanford Facility Highlights EM's Success in Meeting Cost and Schedule Targets August 1, 2012 - 12:00pm Addthis EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month. EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System

  1. Hanford Treats Groundwater Ahead of Schedule | Department of Energy

    Energy Savers [EERE]

    Treats Groundwater Ahead of Schedule Hanford Treats Groundwater Ahead of Schedule September 30, 2014 - 12:00pm Addthis A team of drillers installs a well to support groundwater treatment operations at the Hanford site. A team of drillers installs a well to support groundwater treatment operations at the Hanford site. Shown here is the exterior of the 200 West Groundwater Treatment Facility, DOE’s largest system for treating contaminated groundwater at the Hanford site. Contractor CH2M HILL

  2. ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPORTIONMENT RECORDS | Department of Energy 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and apportionment records include the various files accumulated in the course of formulating the budget for submission to the Office of Management and Budget (OMB) and to the Congress PDF icon ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT

  3. DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment

    Office of Environmental Management (EM)

    Saves Money, Trains Workers, Creates Jobs | Department of Energy Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs May 12, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals

  4. Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule

    Broader source: Energy.gov [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule

  5. Integrated network design and scheduling problems : optimization algorithms and applications.

    SciTech Connect (OSTI)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  6. CP&L-3-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-B Wholesale Power Rate Schedule CP&L-3-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. This rate schedule

  7. SCE&G-1-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-E Wholesale Power Rate Schedule SCE&G-1-E Wholesale Power Rate Schedule Area: South Carolina Electric & Gas Area System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall

  8. SCE&G-3-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-E Wholesale Power Rate Schedule SCE&G-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of

  9. Microsoft Word - EIA-111 Instructions for 2018 FINAL.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    11 Quarterly Electricity Imports and Exports Report Page 1 You must have an EIA Data XChange account to use these instructions EIA-111 QUARTERLY ELECTRICITY IMPORTS AND EXPORTS REPORT DATA XCHANGE INSTRUCTIONS ............................................................................................................................................................................................................................................ PURPOSE Form EIA-111 collects U. S. electricity

  10. Microsoft Word - EIA-111 Instructions for 2018 FINAL.docx

    U.S. Energy Information Administration (EIA) Indexed Site

    111 Quarterly Electricity Imports and Exports Report Page 1 You must have an EIA Data XChange account to use these instructions EIA-111 QUARTERLY ELECTRICITY IMPORTS AND EXPORTS REPORT DATA XCHANGE INSTRUCTIONS ............................................................................................................................................................................................................................................ PURPOSE Form EIA-111 collects U. S. electricity

  11. Handling debugger breakpoints in a shared instruction system

    DOE Patents [OSTI]

    Gooding, Thomas Michael; Shok, Richard Michael

    2014-01-21

    A debugger debugs processes that execute shared instructions so that a breakpoint set for one process will not cause a breakpoint to occur in the other processes. A breakpoint is set by recording the original instruction at the desired location and writing a trap instruction to the shared instructions at that location. When a process encounters the breakpoint, the process passes control to the debugger for breakpoint processing if the breakpoint was set at that location for that process. If the trap was not set at that location for that process, the cacheline containing the trap is copied to a small scratchpad memory, and the virtual memory mappings are changed to translate the virtual address of the cacheline to the scratchpad. The original instruction is then written to replace the trap instruction in the scratchpad, so that process can execute the instructions in the scatchpad thereby avoiding the trap instruction.

  12. PART IV … REPRESENTATIONS AND INSTRUCTIONS

    National Nuclear Security Administration (NNSA)

    K, Page i PART IV - REPRESENTATIONS AND INSTRUCTIONS SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS K-1 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) .................. 131 K-2 FAR 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2015) ...................................................................................................................................................................... 135 K-3 FAR 52.209-7 INFORMATION

  13. PART IV … REPRESENTATIONS AND INSTRUCTIONS

    National Nuclear Security Administration (NNSA)

    K, Page i PART IV - REPRESENTATIONS AND INSTRUCTIONS SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS K-1 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) .................. 131 K-2 FAR 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2015) ...................................................................................................................................................................... 135 K-3 FAR 52.209-7 INFORMATION

  14. PART IV-REPRESENTATIONS AND INSTRUCTIONS

    National Nuclear Security Administration (NNSA)

    148 L-2 FAR 52.215-1 INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004) 150 L-3 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................................... 155 L-4 FAR 52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999) ................................................................................................................................................................ 155 L-5 FAR 52.233-2 SERVICE OF

  15. PART IV-REPRESENTATIONS AND INSTRUCTIONS

    National Nuclear Security Administration (NNSA)

    .... 1 L-2 FAR 52.215-1 INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004) ... 3 L-3 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) ................................................................................... 8 L-4 FAR 52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999) .................................................................................................................................................................... 8 L-5 FAR 52.233-2

  16. PART IV-REPRESENTATIONS AND INSTRUCTIONS

    National Nuclear Security Administration (NNSA)

    148 L-2 FAR 52.215-1 INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004) 150 L-3 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................................... 155 L-4 FAR 52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999) ................................................................................................................................................................ 155 L-5 FAR 52.233-2 SERVICE OF

  17. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect (OSTI)

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  18. SunShot Poster Review Instructions and Information

    Broader source: Energy.gov [DOE]

    SunShot Poster Review Instructions and Information, posted for the SunShot Grand Challenge Summit 2014.

  19. Smart Grid Investment Grant Invoice Template and Instructions | Department

    Energy Savers [EERE]

    of Energy Invoice Template and Instructions Smart Grid Investment Grant Invoice Template and Instructions The purpose of this document is to provide a template with sample information for completing an invoice for Department of Energy vendors. The workbook includes detail, summary, and subrecipient tabs and instructions. File SGIG Invoice Template and Instructions.xlsx More Documents & Publications DISCLAIMER: Questions and Answers for the Smart Grid Investment Grant Program: Reporting

  20. Data Provision Instructions for All DOE Geothermal Technologies Office

    Office of Environmental Management (EM)

    Funds Recipients | Department of Energy Data Provision Instructions for All DOE Geothermal Technologies Office Funds Recipients Data Provision Instructions for All DOE Geothermal Technologies Office Funds Recipients DATA PROVISION INSTRUCTIONS FOR ALL DOE GEOTHERMAL TECHNOLOGIES OFFICE FUNDS RECIPIENTS As required by DOE Geothermal Technologies Office (GTO) Funding Opportunity Announcements for Financial Assistance awards, all GTO funds recipients including national laboratories must provide

  1. 200W Pump and Treat Construction Schedule Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    W Pump and Treat Construction Schedule Review Section C.2.5.3 - Task Order 11-001 The contractor shall provide the following project independent review services, as requested and as described below.. The Contractor shall perform these services in accordance with Contract DE-AC06-09RL14728, C.2.5.3, Portfolio Management, meet milestones and delivery schedules as established by the AMCP Groundwater and Vadose Zone Remediation Project team, and comply with established criteria. Task 200W P&T-1

  2. Experimental Run Schedules for Previous Years | Stanford Synchrotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Lightsource Run Schedules for Previous Years SPEAR Operating / Maintenance Beam Line Schedule Accelerator Physics FY2015 X-ray VUV, BL13 Macromolecular Crystallography FY2014 X-ray VUV, BL13 Macromolecular Crystallography FY2013 X-ray VUV Macromolecular Crystallography FY2012 X-ray Macromolecular Crystallography VUV FY2011 X-ray Macromolecular Crystallography VUV BL13 2011 FY2010 X-ray Macromolecular Crystallography VUV FY2009 X-ray Macromolecular Crystallography VUV FY2008 X-ray

  3. Idaho Site Completes Cleanup Milestone Ahead of Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Media Contact: Erik Simpson (208) 360-0426 For Immediate Release Date: June 23, 2010 Idaho Site Completes Cleanup Milestone Ahead of Schedule Idaho Falls, ID � The Department of Energy�s Idaho Operations Office, through the efforts of its cleanup contractor, CH2M-WG Idaho (CWI), recently reached a key cleanup milestone three weeks ahead of schedule by completing the transfer of nearly 6.6 metric tons of spent nuclear fuel from wet to dry storage. �The transfer of spent nuclear fuel

  4. Federal Supply Schedules References Federal Acquisition Regulation (FAR) Subparts

    Office of Environmental Management (EM)

    -Chapter 8.4 (June 2011) 1 Federal Supply Schedules References Federal Acquisition Regulation (FAR) Subparts 1.1 Purpose, Authority, Issuance - 1.108 FAR conventions 2.1 Definitions 5.3 Synopses of Contract Awards 5.4 Release of Information 6 Competition Requirements 8.4 Federal Supply Schedules 9.1 Responsible Prospective Contractors - 9.105 Procedures 9.4 Debarment, Suspension and Ineligibility - 9.406 Debarment and 9.407 Suspension 12 Acquisition of Commercial Items 12.4 Unique Requirements

  5. 2015 Princeton-CEFRC Summer School on Combustion - Schedule of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Princeton-CEFRC Summer School on Combustion - Schedule of Events Sunday, June 21 st 13:00 - 17:00 Check In 15:00 - 18:00 Lab Tour (EQuad) 1 st tour 3:00pm; 2 nd tour 4:30pm;...

  6. Understanding Process Plant Schedule Slippage and Startup Costs

    Broader source: Energy.gov [DOE]

    This study explores major factors causing schedule delays and problems often experienced in constructing and starting up new process plants. The results of this research provide new insights into the problems firms across the process industries encounter in planning major plant developments.

  7. Pantex Plant Achieves Key Safety Milestone Ahead of Schedule | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration Achieves Key Safety Milestone Ahead of Schedule | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press

  8. ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2: COMMUNICATIONS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS The principal records documenting communication functions include messenger service data; telecommunications service control and operational records; long distance telephone reports; postal records, consisting of post office forms and supporting papers; mail control records and supporting and related papers; agency copies of penalty mail reports; and records relating to private delivery service (such

  9. APPLICANT BACKGROUND SURVEY QUESTIONNAIRE GENERAL INSTRUCTIONS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPLICANT BACKGROUND SURVEY QUESTIONNAIRE GENERAL INSTRUCTIONS The information from this survey is used to help ensure that agency personnel practices meet the requirements of Federal law. Your responses are voluntary. Please answer each of the questions to the best of your ability. Please print entries in pencil or pen. Use only capital letters. Read each item thoroughly before completing the appropriate code number in each box. PRIVACY INFORMATION General The information is provided pursuant

  10. Radiation Worker II Class Scheduled for Aug. 20; Sign up by Aug...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Worker II Class Scheduled for Aug. 20; Sign up by Aug. 19 A Radiation Worker II (SAF802) class is scheduled for Thursday, Aug. 20, from 9 a.m. - 12 noon. The class will...

  11. Energy Department Announces January 2006 Deadline for Appliance Standards Rulemaking Schedules

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced it will present schedules for all appliance rulemaking activities no later than January 31, 2006. The schedules will be...

  12. KP-AP-4-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    AP-4-C Wholesale Power Rate Schedule KP-AP-4-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of

  13. KP-DEP-1-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-C Wholesale Power Rate Schedule KP-DEP-1-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company) and the

  14. KP-DEP-4-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-C Wholesale Power Rate Schedule KP-DEP-4-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company). This rate schedule shall be applicable to the sale at

  15. KP-Replacement-2-B Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Replacement-2-B Wholesale Power Rate Schedule KP-Replacement-2-B Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to

  16. KP-VA-1-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-C Wholesale Power Rate Schedule KP-VA-1-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM

  17. KP-VA-3-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-C Wholesale Power Rate Schedule KP-VA-3-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC

  18. KP-VA-4-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-C Wholesale Power Rate Schedule KP-VA-4-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at

  19. Microsoft PowerPoint - Snippet 3.3 Schedule Guidance & Resources 20140707 [Compatibility Mode]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    information on where to find more information about Scheduling. 1 Scheduling is a specialized field; it is complex and requires training and experience. The purpose of this snippet is to provide experienced users with some of the resources available that contain scheduling guidance. 2 The National Defense Industrial Association (NDIA) Integrated Program Management Division (IPMD) has developed the Planning & Scheduling Excellence Guide (PASEG). The PASEG was developed to further explain the

  20. CP&L-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-B Wholesale Power Rate Schedule CP&L-1-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. This

  1. CP&L-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-B Wholesale Power Rate Schedule CP&L-2-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. This rate schedule

  2. CP&L-4-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-B Wholesale Power Rate Schedule CP&L-4-B Wholesale Power Rate Schedule Area: Carolina Power & Light, Eastern Division System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Carolina Power & Light Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power

  3. Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. Exhibit D: Mirant Potomac River Schedule of Operations, January and February 2006

  4. SCE&G-2-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-E Wholesale Power Rate Schedule SCE&G-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power

  5. SCE&G-4-E Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    4-E Wholesale Power Rate Schedule SCE&G-4-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina served through the transmission facilities of South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at

  6. CU-CBR-1-I Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CBR-1-I Wholesale Power Rate Schedule CU-CBR-1-I Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers Electric Corporation and includes the City of Henderson, Kentucky. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called

  7. CU-CC-1-J Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CC-1-J Wholesale Power Rate Schedule CU-CC-1-J Wholesale Power Rate Schedule Area: Duke Energy Progress, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Duke Energy Progress (formerly known as Carolina Power & Light Company), Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek,

  8. CU-CEK-1-I Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CEK-1-I Wholesale Power Rate Schedule CU-CEK-1-I Wholesale Power Rate Schedule Area: East Kentucky System: CU This rate schedule shall be available to East Kentucky Power Cooperative (hereinafter called the Customer). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the

  9. CU-CK-1-I Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CK-1-I Wholesale Power Rate Schedule CU-CK-1-I Wholesale Power Rate Schedule Area: Kentucky Utilities System: CU This rate schedule shall be available to public bodies served through the facilities of Kentucky Utilities Company, (hereinafter called the Customers.) This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being

  10. CU-CM-1-I Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CM-1-I Wholesale Power Rate Schedule CU-CM-1-I Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such

  11. CU-CSI-1-I Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CSI-1-I Wholesale Power Rate Schedule CU-CSI-1-I Wholesale Power Rate Schedule Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the

  12. CU-CTV-1-I Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CTV-1-I Wholesale Power Rate Schedule CU-CTV-1-I Wholesale Power Rate Schedule Area: Tennessee Valley Authority System: CU This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland

  13. CU-CTVI-1-B Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    CTVI-1-B Wholesale Power Rate Schedule CU-CTVI-1-B Wholesale Power Rate Schedule Area: Former customers of TVA System: Cumberland This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell

  14. KP-AP-1-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    1-C Wholesale Power Rate Schedule KP-AP-1-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection

  15. KP-AP-3-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-C Wholesale Power Rate Schedule KP-AP-3-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate

  16. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial

    Office of Environmental Management (EM)

    Baseline Review | Department of Energy A Integrated Master Schedule (IMS) Initial Baseline Review EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review This EVMS Training Snippet, sponsored by the Office of Project Management (PM) covers how to review an Integrated Master Schedule (IMS) and highlights common areas of non-compliance with ANSI/EIA-748 guidelines. When the scheduling guidelines and requirements are implemented correctly, the results support

  17. Tool for Generating Realistic Residential Hot Water Event Schedules: Preprint

    SciTech Connect (OSTI)

    Hendron, B.; Burch, J.; Barker, G.

    2010-08-01

    The installed energy savings for advanced residential hot water systems can depend greatly on detailed occupant use patterns. Quantifying these patterns is essential for analyzing measures such as tankless water heaters, solar hot water systems with demand-side heat exchangers, distribution system improvements, and recirculation loops. This paper describes the development of an advanced spreadsheet tool that can generate a series of year-long hot water event schedules consistent with realistic probability distributions of start time, duration and flow rate variability, clustering, fixture assignment, vacation periods, and seasonality. This paper also presents the application of the hot water event schedules in the context of an integral-collector-storage solar water heating system in a moderate climate.

  18. ARM Intensive Operational Period Scheduled to Validate New NASA Satellite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ARM Intensive Operational Period Scheduled to Validate New NASA Satellite Beginning in July, all three ARM sites (Southern Great Plains [SGP], North Slope of Alaska, and Tropical Western Pacific; Figure 1) will participate in the AIRS Validation IOP. This three-month intensive operational period (IOP) will validate data collected by the satellite-based Atmospheric Infrared Sounder (AIRS) recently launched into space. On May 4, the National Aeronautics and Space Administration (NASA) launched

  19. ARM Mobile Facility - Design and Schedule for Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mobile Facility - Design and Schedule for Integration K. B. Widener Pacific Northwest National Laboratory Richland, Washington Abstract The Atmospheric Radiation Measurement (ARM) Program has a need for an ARM Mobile Facility (AMF) that can be deployed anywhere in the world for up to 12 months at a time. This system shall be modular so that it can meet the needs of ARM science objectives of each individual deployment. The design phase for developing the AMF has begun. A design review was held

  20. ORISE Contract, PART I - SCHEDULE, Section E Inspection and Acceptance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E INSPECTION AND ACCEPTANCE E.1 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984) ......................................................................................................................... 3 E.2 ACCEPTANCE (MAY 1997) .......................................................................................... 4 Section E - Page 1 of 4 DE-AC05-06OR23100 Blank Page Section E - Page 2 of 4 DE-AC05-06OR23100 PART I - SCHEDULE SECTION E INSPECTION AND ACCEPTANCE E.1 52.246-5

  1. ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPORTIONMENT | Department of Energy 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records include the various files accumulated in the course of formulating the budget for submission to the Office of Management and Budget (OMB) and to the Congress; in defending its requests for funds before both bodies; and after enactment of an appropriation bill, in ensuring that the

  2. LCLS Experimental Run Schedules | Linac Coherent Light Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS Experimental Run Schedules Check-In | Computer Accounts | Data Collection & Analysis | Policies | Proposals | Shipping | User Portal LCLS generally operates November through August, using the shutdown period for upgrades and maintenance projects. LCLS Tentative Long-Range Operating Plans Run 13 (March to August 2016) Run 12 (October 2015 to March 2016) Run 11 (March to August 2015) Run 10 (October 2014 to March 2015) Run 9 (March to August 2014) Run 8 (July 2013 to March 2014) Run 7

  3. Omega Laser Facility Schedule - Laboratory for Laser Energetics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the Director Map to LLE LLE Tours LLE Building Map Partnerships Careers Education Undergraduate Program Graduate Program High School Program Faculty Contacts Computational Astrophysics H-E-D Physics Inertial Confinement Fusion Laser-Plasma Interaction Radiative Hydrodynamics Plasma Astrophysics Organization Director's Office Laser Development and

  4. Attachment 3: Instructions for Use of Green Lease Solicitation Paragraph

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reference Chart | Department of Energy 3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart Attachment 3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart PDF icon green_instructions_attach3.pdf More Documents & Publications Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Microsoft Word - AL2008-05.doc

  5. Instructions for using HSPD-12 Authenticated Outlook Web Access (OWA) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy using HSPD-12 Authenticated Outlook Web Access (OWA) Instructions for using HSPD-12 Authenticated Outlook Web Access (OWA) Provides instructions for remote Outlook access using HSPD-12 Badge. PDF icon HSPD-12 Badge Instructions More Documents & Publications User Guide for Remote Access to VDI/Workplace Using PIV Headquarters Facilities Master Security Plan - Chapter 1, Physical Security Audit Report: IG-0860

  6. Step by Step Instruction - ICR - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Step by Step Instruction - ICR - FINAL Step by Step Instruction - ICR - FINAL PDF icon Step by Step Instructions-ICR-final.pdf More Documents & Publications Information Collection Requests/Paper Reduction Act Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection

  7. Declassification Instruction Guide, March 2014 | Department of Energy

    Office of Environmental Management (EM)

    Declassification Instruction Guide, March 2014 Declassification Instruction Guide, March 2014 March 2014 This reference provides examples and instructions on how to fill out the "Declassify online" of the classification authority block on classified documents. Even though a document may be marked with a declassification date or event that has passed, the document may not be automatically declassified but must be reviewed by a Derivative Declassifier (single review only) to ensure that

  8. Microsoft Word - Final Instructions_20110425.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1905-0194 Expiration Date: 10/31/2013 20110425 Instructions for Form EIA-1605 Voluntary Reporting of Greenhouse Gases Revised Pursuant to 10 CFR Part 300 Guidelines for Voluntary Greenhouse Gas Reporting U.S. Energy Information Administration U.S. Department of Energy November 18, 2010 U.S. Department of Energy U.S. Energy Information Administration Form EIA-1605 Voluntary Reporting of Greenhouse Gases Form Approved OMB No. 1905-0194 Expiration Date: 10/31/2013 November 18, 2010 Voluntary

  9. Instructions For Completing Certified Payroll Report Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wage and Hour Division (WHD) Instructions For Completing Payroll Form, WH-347 * OMB Control No. 1235-0008, Expires 02/28/2018. General: Form WH-347has been made available for the convenience of contractors and subcontractors required by their Federal or Federally-aided construction-type contracts and subcontracts to submit weekly payrolls. Properly filled out, this form will satisfy the requirements of Regulations, Parts 3 and 5 (29 C.F.R., Subtitle A), as to payrolls submitted in connection

  10. Montana - Instructions for Application for Utilities Across State...

    Open Energy Info (EERE)

    Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Instructions for Application for Utilities Across State Trust Lands Abstract This...

  11. DOE Supplemental Instructions for OMB Section 1512 Reporting - For

    Broader source: Energy.gov (indexed) [DOE]

    Contractors | Department of Energy Contractors More Documents & Publications DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients

  12. BLM Instruction Memorandum No. 2011-060 | Open Energy Information

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Inner-Office Memorandum: BLM Instruction Memorandum No. 2011-060PermittingRegulatory GuidanceInner-Office Memorandum...

  13. BLM - Instruction Memorandum No. 2012-140 | Open Energy Information

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - Inner-Office Memorandum: BLM - Instruction Memorandum No. 2012-140PermittingRegulatory GuidanceInner-Office Memorandum...

  14. DOD Instruction 4715.03 - Integrated Natural Resources Management...

    Open Energy Info (EERE)

    DOD Instruction 4715.03 - Integrated Natural Resources Management Plan (INRMP) Implementation Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  15. Optimized scalar promotion with load and splat SIMD instructions...

    Office of Scientific and Technical Information (OSTI)

    VA at www.ntis.gov. Mechanisms for optimizing scalar code executed on a single instruction multiple data (SIMD) engine are provided. Placement of vector operation-splat...

  16. BLM Instruction Memorandum No. 2011-061 | Open Energy Information

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Inner-Office Memorandum: BLM Instruction Memorandum No. 2011-061PermittingRegulatory GuidanceInner-Office Memorandum...

  17. Insertion of operation-and-indicate instructions for optimized...

    Office of Scientific and Technical Information (OSTI)

    The data processing system executing the compiled code is configured to store special exception values in vector output registers, in response to a speculative instruction ...

  18. Microsoft Word - EIA-914 Instructions_Expiration Date 09202012...

    U.S. Energy Information Administration (EIA) Indexed Site

    ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0205 Washington, DC 20585 Expiration Date: 09202012 INSTRUCTIONS for FORM EIA-914 MONTHLY NATURAL GAS PRODUCTION REPORT PURPOSE...

  19. Vermont Instructions for Preparing the VT Hazardous Waste Handler...

    Open Energy Info (EERE)

    Instructions for Preparing the VT Hazardous Waste Handler Site ID Form Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  20. Inverted Metamorphic Multijunction (IMM) Cell Processing Instructions

    SciTech Connect (OSTI)

    Duda, A.; Ward, S.; Young, M.

    2012-02-01

    This technical report details the processing schedule used to fabricate Inverted Metamorphic Multijunction (IMM) concentrator solar cells at The National Renewable Energy Laboratory (NREL). These devices are used as experimental test structures to support the research at NREL that is focused on increasing the efficiency of photovoltaic power conversion. They are not intended to be devices suitable for deployment in working concentrator systems primarily because of heat sinking issues. The process schedule was developed to be compatible with small sample sizes and to afford relatively rapid turn-around times, in support of research efforts. The report describes the use of electro deposition of gold for both the back and front contacts. Electro-deposition is used because of its rapid turn around time and because it is a benign metallization technique that is seldom responsible for damage to the semiconductors. The layer transfer technique is detailed including the use of a commercially available adhesive and the etching away of the parent gallium arsenide substrate. Photolithography is used to define front contact grids as well as the mesa area of the cell. Finally, the selective wet chemical etchant system is introduced and its use to reveal the back contact is described.

  1. Job Scheduling Policy for BG/Q Systems | Argonne Leadership Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facility Policy for BG/Q Systems Contents Mira Job Scheduling Mira Queues User Interface Backfill Queue INCITE/ALCC Overburn Policy Big Run Monday Cetus Job Scheduling Vesta Job Scheduling General Scheduling Guidelines System Maintenance Day Jobs on Hold Reservations Back to top Mira Job Scheduling queue layout Back to top Mira Queues User Queue Queue Nodes Wall-clock Time (hours) Maximum Running per User Maximum Queued Per User prod prod-short 512 - 4096 0 - ≤6 5 20 prod-long 512 - 4096

  2. Federal Assistance Reporting Checklist and Instructions for Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy for Projects Federal Assistance Reporting Checklist and Instructions for Projects File DOE F 4600.2 FA RepReqChklst FINAL 10-2014.docx More Documents & Publications 1 1 Federal Assistance Reporting Checklist and Instructions for RD&D

  3. Instructions for the Supporting Statement - Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Supporting Statement - Revision Instructions for the Supporting Statement - Revision PDF icon Instructions for the Supporting Statementrev-includes BH table.pdf More Documents & Publications Paperwork Reduction Act Submission (OMB 83-I) Supporting Statement: OE Recovery Act Financial Assistance Grants OMB Control Number 1910-5149

  4. Workplace Charging Toolkit: Workshop Speaker Instruction Letter Template |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Inform speakers participating in the employer experience panel about their role in the event. File General Speaker Instruction Letter Template File Clean Cities Branded Speaker Instruction Letter Template More Documents & Publications Workplace Charging Toolkit: Workshop Speaker Outreach Letter Template Workplace Charging Toolkit: Workshop Host Outreach

  5. EIA-930 Hourly and Daily Balancing Authority Operations Reports - Instructions Page

    Gasoline and Diesel Fuel Update (EIA)

    930 Hourly and Daily Balancing Authority Operations Reports - Instructions Page 1 of 3 You must have an EIA Data xChange account to use these instructions HOURLY AND DAILY BALANCING AUTHORITY OPERATIONS REPORT DATA XCHANGE TRANSMITTAL INSTRUCTIONS EIA-930 ............................................................................................................................................................................................................................................

  6. Trident schedule FY16 -- rev 11-10-15.xlsx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule FY 2015-16 11/10/2015 28-Sep Material dynamics (gas gun) / Loomis na 4 5-Oct 4 12-Oct 3 19-Oct maintenance 4 26-Oct AWE -- DTRA / Davis - Sibley South ns 4 2-Nov maintenance 4 9-Nov West target chamber upgrades 3 16-Nov 4 23-Nov 2 30-Nov 4 7-Dec Palaniyappan -- Weibel Instability in Collisionless Shocks West ps 4 14-Dec 4 21-Dec Christmas (3 day week) 3 Christmas Break 28-Dec Christmas Break 0 Christmas Break 4-Jan maintenance 4 11-Jan Zylstra -- Heavy ion stopping West ps-ns 4 18-Jan 3

  7. Scheduler for multiprocessor system switch with selective pairing

    DOE Patents [OSTI]

    Gara, Alan; Gschwind, Michael Karl; Salapura, Valentina

    2015-01-06

    System, method and computer program product for scheduling threads in a multiprocessing system with selective pairing of processor cores for increased processing reliability. A selective pairing facility is provided that selectively connects, i.e., pairs, multiple microprocessor or processor cores to provide one highly reliable thread (or thread group). The method configures the selective pairing facility to use checking provide one highly reliable thread for high-reliability and allocate threads to corresponding processor cores indicating need for hardware checking. The method configures the selective pairing facility to provide multiple independent cores and allocate threads to corresponding processor cores indicating inherent resilience.

  8. Design issues in the semantics and scheduling of asynchronous tasks.

    SciTech Connect (OSTI)

    Olivier, Stephen L.

    2013-07-01

    The asynchronous task model serves as a useful vehicle for shared memory parallel programming, particularly on multicore and manycore processors. As adoption of model among programmers has increased, support has emerged for the integration of task parallel language constructs into mainstream programming languages, e.g., C and C++. This paper examines some of the design decisions in Cilk and OpenMP concerning semantics and scheduling of asynchronous tasks with the aim of informing the efforts of committees considering language integration, as well as developers of new task parallel languages and libraries.

  9. Fermilab | Illinois Accelerator Research Center | Funding and Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Funding and Schedule Funds for the Illinois Accelerator Research Center are provided by a grant from the Illinois Department of Commerce and Economic Opportunity. In addition to a direct contributions of federal funds, DOE will also fund Fermilab to refurbish an existing heavy industrial building to incorporate into the IARC complex. The construction of the OTE building is complete and the 1st and 3rd floors are in use. Outfitting of the 2nd floor office space is in progress. The new building

  10. DOD Instruction 3030.3 - Joint Land Use Study Program | Open...

    Open Energy Info (EERE)

    ProgramPermittingRegulatory GuidanceInstructions Abstract This instruction implements policies, assigns responsibilities, and prescribes procedures for executing the Joint Land...

  11. BLM - Instruction Memorandum No. OC-2012-005 | Open Energy Information

    Open Energy Info (EERE)

    BLM - Instruction Memorandum No. OC-2012-005 Abstract This instruction memorandum sets forth procedures and requirements for conducting the FY 2012 Real Property inventory and...

  12. KP-DEP-2-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-C Wholesale Power Rate Schedule KP-DEP-2-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company) and the Customer.

  13. KP-DEP-3-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    3-C Wholesale Power Rate Schedule KP-DEP-3-C Wholesale Power Rate Schedule Area: Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Progress (formerly known as Carolina Power & Light Company and hereinafter called the Company) and the Customer.

  14. KP-NC-1-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    NC-1-C Wholesale Power Rate Schedule KP-NC-1-C Wholesale Power Rate Schedule Area: Virginia Power/Duke Energy Progress System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter

  15. KP-VA-2-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-C Wholesale Power Rate Schedule KP-VA-2-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC

  16. POLICY GUIDANCE MEMORANDUM #32A Schedule A Appointments of Persons with

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disabilities and Appointments for Disabled Veterans | Department of Energy 2A Schedule A Appointments of Persons with Disabilities and Appointments for Disabled Veterans POLICY GUIDANCE MEMORANDUM #32A Schedule A Appointments of Persons with Disabilities and Appointments for Disabled Veterans Establishes policy and procedures that ensure Schedule A appointments and appointments for disabled veterans are in support of mission accomplishments and are in accordance with merit system principles,

  17. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    SciTech Connect (OSTI)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  18. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    SciTech Connect (OSTI)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  19. Microsoft PowerPoint - Snippet 3.2 Schedule Health Metrics 20140713 [Compatibility Mode]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    focuses on 'what' the metrics are, 'why' they are important, and what they tell us about the schedule health. This Snippet does not focus on the 'how' the metrics are calculated, other than to provide a basic understanding of what is being calculated. 1 As stated in the National Defense Industrial Association's Planning and Scheduling Excellence Guide (PASEG), "Periodic schedule health assessments are essential to ensure the IMS is valid and effective for reporting on accomplishments and

  20. Microsoft PowerPoint - Snippet 5.3 PARSII Analysis Schedule Health Assessment 20140628 [Compatibility Mode]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    schedule health. In PARS II, under the SSS Reports selection on the left, there are folders to the right. The reports being discussed are in the Analysis Reports folder. That folder is broken down into various subfolders pertaining to OAPM's EVMS Project Analysis Standard Operating Procedure (EPASOP). This Snippet covers the subfolder named Schedule Health Assessment. These reports are useful for anyone responsible for project management. The reports that will be discussed are: * Schedule

  1. POLICY GUIDANCE MEMORANDUM #02 Using Schedule A Hiring Authority for ARRA

    Energy Savers [EERE]

    Positions (Expired) | Department of Energy 02 Using Schedule A Hiring Authority for ARRA Positions (Expired) POLICY GUIDANCE MEMORANDUM #02 Using Schedule A Hiring Authority for ARRA Positions (Expired) THIS GUIDANCE HAS EXPIRED OPM is authorizing the use of excepted service appointments under Title 5 CFR 213.31 02 (i) (3) to address the needs of agencies to hire additional staff in support of the American Recovery and Reinvestment Act of 2009 (ARRA) The Schedule A authority under 5 CFR 21

  2. CU-Replacement-3 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Replacement-3 Wholesale Power Rate Schedule CU-Replacement-3 Wholesale Power Rate Schedule Area: Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky, southern Illinois System: CU This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the

  3. KP-AP-2-C Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    2-C Wholesale Power Rate Schedule KP-AP-2-C Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC

  4. EGov PMA Scorecard Cost, Schedule & Performance Standard.tif | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif PDF icon EGov PMA Scorecard Cost, Schedule & Performance Standard.tif More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets

  5. ESPC Task Order Financial Schedules (IDIQ Attachment J-6) | Department of

    Office of Environmental Management (EM)

    Energy Task Order Financial Schedules (IDIQ Attachment J-6) ESPC Task Order Financial Schedules (IDIQ Attachment J-6) Document features worksheets federal agencies can use to determine guaranteed cost savings and contractor payments, energy conservation measure costs and savings, and more in an for an energy savings performance contract (ESPC). Microsoft Office document icon 5_3_to_schedules.doc More Documents & Publications ESPC ENABLE Final Proposal Requirements ESPC ENABLE Draft Task

  6. EVMS Training Snippet: 3.3 Schedule Guidance and Resources | Department of

    Office of Environmental Management (EM)

    Energy 3 Schedule Guidance and Resources EVMS Training Snippet: 3.3 Schedule Guidance and Resources This EVMS Training Snippet, sponsored by the Office of Project Management (PM) provides information on where to find more information about Scheduling. Link to Video Presentation | Prior Snippet (3.2) | Next Snippet (4.1) | Return to Index PDF icon Slides Only PDF icon Slides with Notes More Documents & Publications EVMS Training Snippet: 1.3 EVMS Stage 1 Surveillance EVMS Training

  7. Cost and Schedule Estimate and Analysis (FPM 207), Amarillo | Department of

    Energy Savers [EERE]

    Energy Cost and Schedule Estimate and Analysis (FPM 207), Amarillo Cost and Schedule Estimate and Analysis (FPM 207), Amarillo April 4, 2016 8:00AM EDT to April 8, 2016 5:00PM EDT Cost and Schedule Estimation and Analysis Level 2 Required Course 5 days / 40 CLPs This course provides participants with a high-level overview of cost and schedule estimation techniques necessary for successful project management. Participants receive practical skills training on how to develop independent cost

  8. Property:OpenEI/UtilityRate/DemandChargeWeekdaySchedule | Open...

    Open Energy Info (EERE)

    Jump to: navigation, search This is a property of type Text. Name: Demand Charge Weekday Schedule Pages using the property "OpenEIUtilityRate...

  9. A Methodology to Analyze the Impact of 30-Minute Wind Scheduling on Load-Following Requirements

    SciTech Connect (OSTI)

    Diao, Ruisheng; Makarov, Yuri V.; Samaan, Nader A.; Kujala, Ben

    2014-12-24

    This paper proposes a new and systematic approach to investigating the impact of wind transfer between balancing authorities (BAs) with half-hour scheduling on load following requirements, which was traditionally scheduled on an hourly basis. The analysis is conducted for a few BAs in the Pacific Northwest of the U.S. that are described as source BAs (sending renewables) and sink BAs (receiving renewables). The main hypothesis is that if the source BA could schedule interchange for wind on a half-hourly basis, it would make the schedule follow its net load more closely. The scheduling change in the source BA is matched by adding the corresponding component to the net load in the sink BA. The load-following requirements are calculated as: (a) by the difference between the net load and modified schedule in the source BA, and (b) the difference between modified net load and unchanged hourly schedule in the sink BA. Results are presented as hourly upward and downward load following requirements in the source and sink BA, and compared with the results obtained with all generators scheduled on an hourly basis. Thus, the proposed method can effectively help utilities better understand the impact of 30-minute scheduling and make better business decisions.

  10. Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec.

    Energy Savers [EERE]

    1-20, 2006 | Department of Energy Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Docket No. EO-05-01. Regarding the planned line outage, scheduled for Feb. 20 through Mar. 6, I am requesting that the residents near the plant be moved for the duration of the outage to protect their health. PDF icon Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair

  11. Property:OpenEI/UtilityRate/DemandWeekdaySchedule | Open Energy...

    Open Energy Info (EERE)

    search This is a property of type Text. Retrieved from "http:en.openei.orgwindex.php?titleProperty:OpenEIUtilityRateDemandWeekdaySchedule&oldid539760" Feedback...

  12. RE-SCHEDULED FROM JAN 22 TO JAN 28 - COLLOQUIUM: Addressing Big...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Colloquia MBG Auditorium RE-SCHEDULED FROM JAN 22 TO JAN 28 - COLLOQUIUM: Addressing Big Data Challenges in Simulation-based Science Professor Manish Parashar Rutgers...

  13. SIMULATING AN ACCELERATION SCHEDULE FOR NDCX-II

    SciTech Connect (OSTI)

    Sharp, W.M.; Friedman, A.; Grote, D.P.; Henestroza, E.; Leitner, M.A.; Waldron, W.L.

    2009-05-01

    The Virtual National Laboratory for Heavy-Ion Fusion Science is developing a physics design for NDCX-II, an experiment to study warm dense matter heated by ions. Present plans call for using 34 induction cells to accelerate 45 nC of Li+ ions to more than 3 MeV, followed by neutralized drift-compression. To heat targets to the desired temperatures, the beam must be compressed to a millimeter-scale radius and a duration of about 1 ns. A novel NDCX-II acceleration schedule has been developed using an interactive one-dimensional particle-in-cell simulation ASP to model the longitudinal physics and axisymmetric WARP simulations to validate the 1-D model and add transverse focusing. Three-dimensional Warp runs have been used recently to study the sensitivity to misalignments in the focusing solenoids.

  14. Idaho Instruction for Filing a Request for Extension of Time...

    Open Energy Info (EERE)

    Instruction for Filing a Request for Extension of Time to Submit Proof of Beneficial Use Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory...

  15. Instructions for Accessing FedConnect Postings, June 30, 2009

    Broader source: Energy.gov [DOE]

    Instructions for Accessing FedConnect Postings and applying for Federal grants including the Smart Grid Investment Grants awarded as part of the American Recovery and Reinvestment Act of 2009.

  16. WSDE Air Operating Permit Application and Instructions | Open...

    Open Energy Info (EERE)

    Application and InstructionsLegal Published NA Year Signed or Took Effect 2006 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  17. Federal Assistance Reporting Checklist and Instructions for Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Projects Federal Assistance Reporting Checklist and Instructions for Projects File DOE F 4600.2 FA RepReqChklst FINAL 10-2014.docx More Documents & Publications 1 1 Federal ...

  18. RCRA Hazardous Waste Part A Permit Application: Instructions...

    Open Energy Info (EERE)

    Hazardous Waste Part A Permit Application: Instructions and Form (EPA Form 8700-23) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste...

  19. ALCF Theta Early Science Program: Proposal Instructions | Argonne

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Leadership Computing Facility Proposal Instructions CFP is Now Closed (as of 22 May 2015) General Information and Submission Instructions Our intent is for Theta Early Science Program (ESP) proposals to be relatively simple and short-a stripped-down version of an INCITE proposal. The sections of the proposal are PI and co-PI information Project Summary Executive Summary Benefit to Community Science Summary Application Sumary Estimate of Resources Required Portability Project Team Members For

  20. Safety System Oversight Staffing Analysis (Instructions, Blank Sheet and

    Energy Savers [EERE]

    Example Sheet) | Department of Energy Safety System Oversight Staffing Analysis (Instructions, Blank Sheet and Example Sheet) Safety System Oversight Staffing Analysis (Instructions, Blank Sheet and Example Sheet) This Staffing Analysis calculation is completed using an Excel worksheet. Information locations are identified by titles in column or row headings and worksheet locations based on the unmodified blank worksheet. Use caution when making worksheet modifications since changes to the

  1. Instructions for WebVPN Connectivity | Department of Energy

    Office of Environmental Management (EM)

    Instructions for WebVPN Connectivity Instructions for WebVPN Connectivity WebVPN allows a remote user to access Outlook Web Access, Citrix Workplace Environment (CWE), and other web-based applications from any computer with an Internet connection, with no requirement for additional software to be downloaded and installed to the remote machine. There is no operating system, ISP, or software requirements associated with this connectivity option, which means that any platform, Windows, Macintosh,

  2. May 12 EXPO Event Schedule 8:00-11:00 Red Cross Blood Drive Bloodmobil...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 12 EXPO Event Schedule 8:00-11:00 Red Cross Blood Drive Bloodmobile 10:00 & 3:30 Vehicle Accident Demo Arena 5:00-6:30 Bike Rodeo Arena May 13 EXPO Event Schedule 7:30-9:00 MSA...

  3. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  4. Scheduling Chemotherapy: Catch 22 between Cell Kill and Resistance Evolution

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Gardner, Shea N.

    2000-01-01

    Dose response curves show that prolonged drug exposure at a low concentration may kill more cells than short exposures at higher drug concentrations, particularly for cell cycle phase specific drugs. Applying drugs at low concentrations for prolonged periods, however, allows cells with partial resistance to evolve higher levels of resistance through stepwise processes such as gene amplification. Models are developed for cell cycle specific (CS) and cell cycle nonspecific (CNS) drugs to identify the schedule of drug application that balances this tradeoff. The models predict that a CS drug may be applied most effectively by splitting the cumulative dose intomore » many (>40) fractions applied by long-term chemotherapy, while CNS drugs may be better applied in fewer than 10 fractions applied over a shorter term. The model suggests that administering each fraction by continuous infusion may be more effective than giving the drug as a bolus, whether the drug is CS or CNS. In addition, tumors with a low growth fraction or slow rate of cell division are predicted to be controlled more easily with CNS drugs, while those with a high proliferative fraction or fast cell division rate may respond better to CS drugs.« less

  5. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect (OSTI)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  6. DE-EM-0001971 WIPP M&O F-i PART I - THE SCHEDULE SECTION F

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F-i PART I - THE SCHEDULE SECTION F DELIVERIES OR PERFORMANCE Table of Content F.1 PERIOD OF PERFORMANCE ......

  7. CEBAF Three-Year Schedule Message from Hugh Montgomery | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CEBAF Three-Year Schedule: Message from Hugh Montgomery Dear All, Today, we posted a new three-year view of the laboratory accelerator (CEBAF) schedule. Like all long-range schedules, there are uncertainties as to whether it will be achieved. It contains a few weeks added in each of FY17 and FY18 to the guidance provided by the Office of Nuclear Physics for the recent budget discussions with them. It also corresponds to the commissioning plans which follow the 12 GeV Upgrade Project

  8. House Passage of H.R. 5254 - The Refinery Permit Process Schedule Act |

    Energy Savers [EERE]

    Department of Energy Passage of H.R. 5254 - The Refinery Permit Process Schedule Act House Passage of H.R. 5254 - The Refinery Permit Process Schedule Act June 8, 2006 - 2:17pm Addthis Statement from Secretary Bodman WASHINGTON, DC - The following is a statement from the Secretary Samuel W. Bodman of the Department of Energy on the passage of House Resolution 5254, The Refinery Permit Process Schedule Act: "I commend the House of Representatives for their passage of this important piece

  9. Edison is scheduled to move to a new facility building on 11/30/2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled to move to a new facility building on 11/30/2015 Edison is scheduled to move to a new facility building on 11/30/2015 October 29, 2015 Edison is scheduled to be powered off at 7:00 am PST on November 30, 2015, for the move to the new CRT building. We expect Edison to be offline for up to six weeks. Here is a breakdown of the move and how it will impact users: - At 00:01 PST (midnight) on November 30, 2015, Edison queues will be turned off. Any jobs running at that time will be killed,

  10. EVMS Training Snippet: 3.2 Schedule Health Metrics | Department of Energy

    Office of Environmental Management (EM)

    2 Schedule Health Metrics EVMS Training Snippet: 3.2 Schedule Health Metrics This EVMS Training Snippet sponsored by the Office of Project Management (PM) focuses on 'what' the metrics are, 'why' they are important, and what they tell us about the schedule health. This Snippet does not focus on the 'how' the metrics are calculated, other than to provide a basic understanding of what is being calculated. Link to Video Presentation | Prior Snippet (3.1B) | Next Snippet (3.3) | Return to Index PDF

  11. Implications of Scheduled ITC Reversion for RPS Compliance: Preliminary Results

    SciTech Connect (OSTI)

    Lowder, Travis; Miller, John; O'Shaughnessy, Eric; Heeter, Jenny

    2015-09-14

    This poster presents DRAFT initial results of a forthcoming NREL analysis. The analysis investigates the impacts of the scheduled investment tax credit (ITC) reversion from 30 percent to 10 percent for certain solar photovoltaic projects. Specifically, it considers whether the reversion will result in increased use of alternative compliance payments (ACPs) in lieu of solar renewable energy credits (SRECs) for renewable portfolio standard (RPS) compliance. The analysis models the effect of a 10 percent ITC on power purchase agreement (PPA) prices for non-residential systems in the eight states with solar carve-outs and solar ACPs. Our preliminary results suggest that states will likely install sufficient capacity to meet long-term targets through SRECs rather than ACPs following the ITC reversion. However, the analysis shows that the ITC reversion could affect project economics such that capacity shortfalls in certain states could temporarily increase the use of ACPs. NREL anticipates publishing a full report of this analysis in fall 2015. credits (SRECs) for renewable portfolio standard (RPS) compliance. The analysis models the effect of a 10 percent ITC on power purchase agreement (PPA) prices for non-residential systems in the eight states with solar carve-outs and solar ACPs. Our preliminary results suggest that states will likely install sufficient capacity to meet long-term targets through SRECs rather than ACPs following the ITC reversion. However, the analysis shows that the ITC reversion could affect project economics such that capacity shortfalls in certain states could temporarily increase the use of ACPs. NREL anticipates publishing a full report of this analysis in fall 2015.

  12. EIA-877 WINTER HEATING FUELS TELEPHONE SURVEY INSTRUCTIONS

    Gasoline and Diesel Fuel Update (EIA)

    7, "Winter Heating Fuels Telephone Survey" Page 1 U. S. DEPARTMENT OF ENERGY U.S. ENERGY INFORMATION ADMINISTRATION Washington, D. C. 20585 OMB No. 1905-0174 Expiration Date: 09/30/17 Version No.: 2014.01 EIA-877 WINTER HEATING FUELS TELEPHONE SURVEY INSTRUCTIONS 1. QUESTIONS? If you have any questions about Form EIA-877 after reading the instructions, please call our toll free number 1-800-638-8812. 2. PURPOSE The U.S. Energy Information Administration (EIA) Form EIA-877, "Winter

  13. H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to Perform Work on State...

  14. Property:OpenEI/UtilityRate/EnergyWeekendSchedule | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search This is a property of type Text. Retrieved from "http:en.openei.orgwindex.php?titleProperty:OpenEIUtilityRateEnergyWeekendSchedule&oldid539799...

  15. Property:OpenEI/UtilityRate/EnergyWeekdaySchedule | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search This is a property of type Text. Retrieved from "http:en.openei.orgwindex.php?titleProperty:OpenEIUtilityRateEnergyWeekdaySchedule&oldid539798...

  16. DOE TRANSCOM Technical Support Services DE-EM0002903 C-1 PART I - THE SCHEDULE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C-1 PART I - THE SCHEDULE SECTION C - DESCRIPTIONS/SPECS./ WORK STATEMENT PERFORMANCE WORK STATEMENT (PWS) C.01 CONTRACT PURPOSE AND OBJECTIVE:........................................................................... C-2 C.02 BACKGROUND ...................................................................................................................... C-2 C.03 SCOPE

  17. GRR Update Meeting scheduled for 9/13 in D.C. | OpenEI Community

    Open Energy Info (EERE)

    GRR Update Meeting scheduled for 913 in D.C. Home > Blogs > Kyoung's blog Kyoung's picture Submitted by Kyoung(150) Contributor 6 September, 2012 - 08:51 D.C. GRR meeting update...

  18. GRR workshop at GRC scheduled for 10/2 in Reno, NV | OpenEI Community

    Open Energy Info (EERE)

    GRR workshop at GRC scheduled for 102 in Reno, NV Home > Blogs > Kyoung's blog Kyoung's picture Submitted by Kyoung(150) Contributor 6 September, 2012 - 09:05 GRC + workshop + GRR...

  19. LCLS-schedul_run-II_10_05_6-detail.xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Run II Detailed Schedule, May 6-September 13, 2010 Thurs Fri Sat Sun Mon Tues Wed BL Prop Spokesperson PI Planned ActivityExperiment Title POC AD Program Deputy Week 1 6-May...

  20. Title 43 CFR 3000.12 What is the Fee Schedule for Fixed Fees...

    Open Energy Info (EERE)

    000.12 What is the Fee Schedule for Fixed Fees? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  1. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS)...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Over Target Baseline (OTB) and The Over Target Schedule (OTS) Implementations EVMS Training Snippet: 4.6 Baseline Control Methods EVMS Training Snippet: 4.9 High-level EVM...

  2. PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

    Energy Savers [EERE]

    PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 ...................................................................................................... 2 TYPE OF CONTRACT B.2 ............................................................................................ 2 ITEM(S) BEING ACQUIRED B.3 .............................................................. 4 OBLIGATION AND AVAILABILITY OF FUNDS B.4

  3. Exhibit D: Mirant Potomac River Schedule of Unit Operations: January- March 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations related to Supplement Number 4 of the Operating Plan of Mirant Potomac River, LLC

  4. Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January- March 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations in support of Supplement Number 4 to the Operating Plan of Mirant Potomac River, LLC

  5. Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations, part of Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC

  6. Sec. Moniz to Georgia, Energy Department Scheduled to Close on Loan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guarantees to Construct New Nuclear Power Plant Reactors | Department of Energy to Georgia, Energy Department Scheduled to Close on Loan Guarantees to Construct New Nuclear Power Plant Reactors Sec. Moniz to Georgia, Energy Department Scheduled to Close on Loan Guarantees to Construct New Nuclear Power Plant Reactors February 19, 2014 - 1:30pm Addthis Washington D.C. - Building on President Obama's State of the Union address to Congress and the American public last month, U.S. Secretary of

  7. Hanford Advisory Board Budgets and Contracts Committee Meeting 2011 Hanford Lifecycle Scope, Schedule and Cost Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 Lifecycle Scope, Schedule and Cost Report Stephen Korenkiewicz, Project Manager US Department of Energy - Richland Operations Office June 6, 2013 1 2 Tri-Party Project Managers The U.S. Department of Energy (DOE), Richland Operations Office (RL) Project Integration and Control (PIC) organization is responsible for Tri-Party Agreement (TPA) Milestone M-036-01C, 2013 Hanford Lifecycle Scope, Schedule and Cost Report (Lifecycle Report) * Stephen Korenkiewicz is the RL Project Manager * David

  8. U.S. Department of Energy Schedules Regional Workshops to Provide Expert

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Input on 2009 Transmission Congestion Study | Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study May 16, 2008 - 12:00pm Addthis Second Congestion Study to Further Evaluate our Nation's Electricity Reliability in the Face of Growing Energy Demand WASHINGTON, DC - As part of the Bush Administration's comprehensive

  9. U.S. Department of Energy Schedules Regional Workshops to Provide Expert

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Input on 2009 Transmission Congestion Study | Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study May 16, 2008 - 1:53pm Addthis Second Congestion Study to Further Evaluate our Nation's Electricity Reliability in the Face of Growing Energy Demand WASHINGTON, DC - As part of the Bush Administration's comprehensive

  10. To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair Dec. 1-20, 2006

    Energy Savers [EERE]

    From: ecchimento@comcast.net [mailto:ecchimento@comcast.net] Sent: Monday, January 29, 2007 6:28 PM To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Larry, Regarding the planned line outage, scheduled for Feb. 20 through Mar. 6, I am requesting that the residents near the plant be moved for the duration of the outage to protect their health. Would you include this comment also in the ongoing recorded discussion? Thank you. Elizabeth -----Original Message-----

  11. Two Peer Review Processes Help EM Achieve Cost, Schedule Targets in

    Energy Savers [EERE]

    Environmental Cleanup Mission | Department of Energy Two Peer Review Processes Help EM Achieve Cost, Schedule Targets in Environmental Cleanup Mission Two Peer Review Processes Help EM Achieve Cost, Schedule Targets in Environmental Cleanup Mission August 15, 2012 - 12:00pm Addthis Members of the project peer review team for the River Corridor Closure Project at the Hanford site gather for a photo while on a tour of Hanford's B Reactor National Historic Landmark in February. Members of the

  12. Microsoft Word - PoRiver Project Schedule - Letter to DOE_042807.doc

    Office of Environmental Management (EM)

    30, 2007 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Project Outage Schedule Clarification Dear Mr. Mansueti: I am writing to clarify the upcoming outage schedule for the Potomac River project and to explain certain discrepancies that are present in Pepco's most recent communications. 1 The monthly status report submitted to the Federal Energy Regulatory Commission

  13. EVMS Training Snippet: 5.3 PARSII Analysis: Schedule Health Assessment |

    Office of Environmental Management (EM)

    Department of Energy 3 PARSII Analysis: Schedule Health Assessment EVMS Training Snippet: 5.3 PARSII Analysis: Schedule Health Assessment This EVMS Training Snippet, sponsored by the Office of Project Management (PM) is one in a series regarding PARS II Analysis reports. PARS II offers direct insight into EVM project data from the contractor's internal systems. The reports were developed with the users in mind, organized and presented in an easy to follow manner, with analysis results and

  14. VISUAL STEP-BY-STEP INSTRUCTIONS ON HOW TO APPLY FOR A JOB ON...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    VISUAL STEP-BY-STEP INSTRUCTIONS ON HOW TO APPLY FOR A JOB ON THE USAJOBS WEBSITE (These instructions also explain the differences between DEU and MP.) STEP 1: Locate the USAJOBS...

  15. Instruction-level performance modeling and characterization of multimedia applications

    SciTech Connect (OSTI)

    Luo, Y.; Cameron, K.W.

    1999-06-01

    One of the challenges for characterizing and modeling realistic multimedia applications is the lack of access to source codes. On-chip performance counters effectively resolve this problem by monitoring run-time behaviors at the instruction-level. This paper presents a novel technique of characterizing and modeling workloads at the instruction level for realistic multimedia applications using hardware performance counters. A variety of instruction counts are collected from some multimedia applications, such as RealPlayer, GSM Vocoder, MPEG encoder/decoder, and speech synthesizer. These instruction counts can be used to form a set of abstract characteristic parameters directly related to a processor`s architectural features. Based on microprocessor architectural constraints and these calculated abstract parameters, the architectural performance bottleneck for a specific application can be estimated. Meanwhile, the bottleneck estimation can provide suggestions about viable architectural/functional improvement for certain workloads. The biggest advantage of this new characterization technique is a better understanding of processor utilization efficiency and architectural bottleneck for each application. This technique also provides predictive insight of future architectural enhancements and their affect on current codes. In this paper the authors also attempt to model architectural effect on processor utilization without memory influence. They derive formulas for calculating CPI{sub 0}, CPI without memory effect, and they quantify utilization of architectural parameters. These equations are architecturally diagnostic and predictive in nature. Results provide promise in code characterization, and empirical/analytical modeling.

  16. Insertion of operation-and-indicate instructions for optimized SIMD code

    Office of Scientific and Technical Information (OSTI)

    (Patent) | SciTech Connect Insertion of operation-and-indicate instructions for optimized SIMD code Citation Details In-Document Search Title: Insertion of operation-and-indicate instructions for optimized SIMD code Mechanisms are provided for inserting indicated instructions for tracking and indicating exceptions in the execution of vectorized code. A portion of first code is received for compilation. The portion of first code is analyzed to identify non-speculative instructions performing

  17. EnPI V4.0 Installation and Uninstallation Instructions | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Installation and Uninstallation Instructions EnPI V4.0 Installation and Uninstallation Instructions Instructions on how to install or uninstall the EnPI Tool v4.0. PDF icon EnPI Installation and Un-Install Instructions More Documents & Publications EnPI V4.0 User Manual EnPI V3.0 Demonstration Webinar EnPI V4.0 Tool Algorithm

  18. APPENDIX A: Forms and Instructions Form Form R93D-44 Form R93D...

    U.S. Energy Information Administration (EIA) Indexed Site

    and Instructions Form Form R93D-44 Form R93D-03 Form R93D-59 Instructions Form RT94-02 Form RT94-04 Form RT94-0 Form RT94-03 Form RT94-05 Form RT94-06 Instructions Form...

  19. Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

    SciTech Connect (OSTI)

    Hulett, David T.; Nosbisch, Michael R.

    2012-07-01

    This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by m

  20. Simulated Stochastic Approximation Annealing for Global Optimization with a Square-Root Cooling Schedule

    SciTech Connect (OSTI)

    Liang, Faming; Cheng, Yichen; Lin, Guang

    2014-06-13

    Simulated annealing has been widely used in the solution of optimization problems. As known by many researchers, the global optima cannot be guaranteed to be located by simulated annealing unless a logarithmic cooling schedule is used. However, the logarithmic cooling schedule is so slow that no one can afford to have such a long CPU time. This paper proposes a new stochastic optimization algorithm, the so-called simulated stochastic approximation annealing algorithm, which is a combination of simulated annealing and the stochastic approximation Monte Carlo algorithm. Under the framework of stochastic approximation Markov chain Monte Carlo, it is shown that the new algorithm can work with a cooling schedule in which the temperature can decrease much faster than in the logarithmic cooling schedule, e.g., a square-root cooling schedule, while guaranteeing the global optima to be reached when the temperature tends to zero. The new algorithm has been tested on a few benchmark optimization problems, including feed-forward neural network training and protein-folding. The numerical results indicate that the new algorithm can significantly outperform simulated annealing and other competitors.