National Library of Energy BETA

Sample records for issue a-44 final

  1. Evaluation of station blackout accidents at nuclear power plants: Technical findings related to unresolved safety issue A-44: Final report

    SciTech Connect (OSTI)

    Not Available

    1988-06-01

    ''Station Blackout,'' which is the complete loss of alternating current (AC) electrical power in a nuclear power plant, has been designated as Unresolved Safety Issue A-44. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on AC power, the consequences of a station blackout could be severe. This report documents the findings of technical studies performed as part of the program to resolve this issue. The important factors analyzed include: the fequency of loss of offsite power; the probability that emergency or onsite AC power supplies would be unavailable; the capability and reliability of decay heat removal systems independent of AC power; and the likelihood that offsite power would be restored before systems that cannot operate for extended periods without AC power fail, thus resulting in core damage. This report also addresses effects of different designs, locations, and operational features on the estimated frequency of core damage resulting from station blackout events.

  2. Regulatory/backfit analysis for the resolution of Unresolved Safety Issue A-44, Station Blackout

    SciTech Connect (OSTI)

    Rubin, A.M.

    1988-06-01

    Station blackout is the complete loss of alternating current (ac) electric power to the essential and nonessential buses in a nuclear power plant; it results when both offsite power and the onsite emergency ac power systems are unavailable. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on ac power, the consequences of a station blackout could be severe. Because of the concern about the frequency of loss of offsite power, the number of failures of emergency diesel generators, and the potentially severe consequences of a loss of all ac power, ''Station Blackout'' was designated as Unresolved Safety Issue (USI) A-44. This report presents the regulatory/backfit analysis for USI A-44. It includes (1) a summary of the issue, (2) the recommended technical resolution, (3) alternative resolutions considered by the Nuclear Regulatory Commission (NRC) staff, (4) an assessment of the benefits and costs of the recommended resolution, (5) the decision rationale, (6) the relationship between USI A-44 and other NRC programs and requirements, and (7) a backfit analysis demonstrating that the resolution of USI A-44 complies with the backfit rule (10 CFR 50.109).

  3. Regulatory analysis for the resolution of Unresolved Safety Issue A-44, Station Blackout. Draft report

    SciTech Connect (OSTI)

    Rubin, A.M.

    1986-01-01

    ''Station Blackout'' is the complete loss of alternating current (ac) electric power to the essential and nonessential buses in a nuclear power plant; it results when both offsite power and the onsite emergency ac power systems are unavailable. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on ac power, the consequences of a station blackout could be severe. Because of the concern about the frequency of loss of offsite power, the number of failures of emergency diesel generators, and the potentially severe consequences of a loss of all ac power, ''Station Blackout'' was designated as Unresolved Safety Issue (USI) A-44. This report presents the regulatory analysis for USI A-44. It includes: (1) a summary of the issue, (2) the proposed technical resolution, (3) alternative resolutions considered by the Nuclear Regulatory Commission (NRC) staff, (4) an assessment of the benefits and costs of the recommended resolution, (5) the decision rationale, and (6) the relationship between USI A-44 and other NRC programs and requirements.

  4. Technical Assessment Team Issues Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2015 Technical Assessment Team Issues Final Report This week the Department of Energy's Technical Assessment Team (TAT) visited Carlsbad and met with federal and contractor staff ...

  5. LM Issues Final Programmatic Environmental Impact Statement on...

    Energy Savers [EERE]

    Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program LM Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program ...

  6. DOE Issues Final Site-Wide Environmental Impact Statement for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site...

  7. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  8. Department of Energy Issues Final Request for Proposals for Savannah...

    Energy Savers [EERE]

    Request for Proposals for Savannah River Site Liquid Waste Contract Department of Energy Issues Final Request for Proposals for Savannah River Site Liquid Waste Contract September ...

  9. DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion...

    Energy Savers [EERE]

    Paducah Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services October 6, 2014 - 4:13pm Addthis Media ...

  10. DOE Issues Final Request for Proposal for Portsmouth Gaseous...

    Energy Savers [EERE]

    Portsmouth Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services December 9, 2014 - 3:37pm Addthis ...

  11. DOE Issues Finding of No Significant Impact and Final Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issues Final RFP for Portsmouth Support Services DOE Issues Final RFP for Portsmouth Support Services December 16, 2014 - 11:03am Addthis The Department of Energy yesterday released a final request for proposals for infrastructure support services at the Portsmouth Gaseous Diffusion Plant that will be set aside for small businesses. This comes after the release of a draft RFP in early July. "A firm-fixed-price, labor hour, cost reimbursement, and indefinite delivery/indefinite quantity

  12. DOE Issues Final Environmental Impact Statement for Disposal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, ...

  13. DOE Issues Final Environmental Impact Statement for Moab, Utah Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Environmental Impact Statement for Moab, Utah Site DOE Issues Final Environmental Impact Statement for Moab, Utah Site July 25, 2005 - 2:27pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its final environmental impact statement (EIS) for the Moab Uranium Mill Tailings Remedial Action Project Site, located on the bank of the Colorado River. The EIS details the preferred option of removal of the tailings pile and contaminated materials, along

  14. DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant Support Services | Department of Energy Portsmouth Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services December 9, 2014 - 3:37pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion

  15. DOE Issues Finding of No Significant Impact and Final Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment on Road Project U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release Thursday August 12, 2010 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Road Project The U.S. Department of Energy has issued a Finding of No Significant Impact stemming from an environmental assessment it performed to examine the potential environmental impacts of building an internal road to safely ship

  16. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov March 16, 2015 DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be

  17. DOE Issues Final Environmental Impact Statement for Disposal of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greater-Than-Class C Waste | Department of Energy Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term management of

  18. DOE Issues Final Appliance Test Procedure Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the

  19. DOE Issues Final RFP for Hanford Site Lab Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab. A Draft RFP was previously released on February 28, 2014, requesting comments from industry.

  20. CEQ Issues Final Guidance for Effective Use of Programmatic NEPA Reviews |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Issues Final Guidance for Effective Use of Programmatic NEPA Reviews CEQ Issues Final Guidance for Effective Use of Programmatic NEPA Reviews December 22, 2014 - 1:15pm Addthis The Council on Environmental Quality (CEQ) issued final guidance for effective use of programmatic National Environmental Policy Act reviews on December 18, 2014. The guidance provides clarification on when and how Federal agencies can use programmatic NEPA reviews in accordance with NEPA and the

  1. DOE Issues Final Request for Proposals for the West Valley Demonstrati...

    Energy Savers [EERE]

    Valley Demonstration Project Supplemental Environmental Impact Statement Support Service DOE Issues Final Request for Proposals for the West Valley Demonstration Project ...

  2. DOE Issues Final RFP for Portsmouth Support Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues Final RFP for Portsmouth Support Services DOE Issues Final RFP for Portsmouth Support Services December 16, 2014 - 11:03am Addthis The Department of Energy yesterday released a final request for proposals for infrastructure support services at the Portsmouth Gaseous Diffusion Plant that will be set aside for small businesses. This comes after the release of a draft RFP in early July. "A firm-fixed-price, labor hour, cost reimbursement, and indefinite delivery/indefinite quantity

  3. Insurance issues and natural gas vehicles. Final report, January 1992

    SciTech Connect (OSTI)

    Squadron, W.F.; Ward, C.O.; Brown, M.H.

    1992-01-01

    GRI has been funding research on natural gas vehicle (NGV) technology since 1986. To support the activity, GRI is evaluating a number of NGV issues including fuel storage, tank inspection, system safety, refueling, U.S. auto and truck use characteristics, and the fleet vehicle infrastructure. In addition, insurance and leasing companies will require new regulations and policies to address clean-fueled vehicle fleets' emergence into the marketplace. These policies may influence and partially determine the structure of the alternatively fueled vehicle industry, and the requirements, if any, imposed upon vehicle technologies. The report asseses the insurance and leasing industries' infrastructure/institutional barriers as they relate to the introduction of natural gas fueled vehicle fleets.

  4. CRITICAL ISSUES IN HIGH END COMPUTING - FINAL REPORT

    SciTech Connect (OSTI)

    Corones, James

    2013-09-23

    High-End computing (HEC) has been a driver for advances in science and engineering for the past four decades. Increasingly HEC has become a significant element in the national security, economic vitality, and competitiveness of the United States. Advances in HEC provide results that cut across traditional disciplinary and organizational boundaries. This program provides opportunities to share information about HEC systems and computational techniques across multiple disciplines and organizations through conferences and exhibitions of HEC advances held in Washington DC so that mission agency staff, scientists, and industry can come together with White House, Congressional and Legislative staff in an environment conducive to the sharing of technical information, accomplishments, goals, and plans. A common thread across this series of conferences is the understanding of computational science and applied mathematics techniques across a diverse set of application areas of interest to the Nation. The specific objectives of this program are: Program Objective 1. To provide opportunities to share information about advances in high-end computing systems and computational techniques between mission critical agencies, agency laboratories, academics, and industry. Program Objective 2. To gather pertinent data, address specific topics of wide interest to mission critical agencies. Program Objective 3. To promote a continuing discussion of critical issues in high-end computing. Program Objective 4.To provide a venue where a multidisciplinary scientific audience can discuss the difficulties applying computational science techniques to specific problems and can specify future research that, if successful, will eliminate these problems.

  5. DOE Issues Final Rule for Section 133 of the Energy Independence Act (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01

    This fact sheet provides a summary of the final rule under Section 133 of the Energy Independence and Security Act of 2007 (EISA) that the U.S. Department of Energy (DOE) issued in March 2014.

  6. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

  7. DOE Issues Final Rule for Alternative Efficiency Determination Methods and Alternative Rating Methods

    Broader source: Energy.gov [DOE]

    The Department of Energy has issued a pre-publication Federal Register final rule revising its existing regulations governing the use of particular methods as alternatives to testing for commercial heating, ventilating, air-conditioning, water heating, and refrigeration equipment.

  8. NNSA Issues Final Request for Proposals for Los Alamos National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor | National Nuclear Security Administration | (NNSA) Issues Final Request for Proposals for Los Alamos National Laboratory Contractor May 19, 2005 WASHINGTON, DC -- The Department of Energy's (DOE) National Nuclear Security Administration (NNSA) has issued a final Request for Proposals (RFP) for the competitive selection of a management and operating contractor for Los Alamos National Laboratory located in Los Alamos, NM. In April, 2003 former Secretary of Energy Spencer Abraham

  9. DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Processing Center Services | Department of Energy Oak Ridge Transuranic Waste Processing Center Services DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services October 14, 2014 - 2:16pm Addthis Media Contact Bill Taylor, 803-952-8564, bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for support services at the Oak Ridge Transuranic Waste Processing Center (TWPC) in Oak Ridge,

  10. DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support Services | Department of Energy Paducah Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services October 6, 2014 - 4:13pm Addthis Media Contact Bill Taylor, 803-952-8564, bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the performance of infrastructure support services at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky. A

  11. DOE Issues Final Request for Proposal for the Operation of Depleted Uranium

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hexafluoride (DUF6) Conversion Facilities | Department of Energy the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities DOE Issues Final Request for Proposal for the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities September 8, 2015 - 3:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the Operation of Depleted

  12. DOE Issues Final RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP for Idaho Cleanup Project Core DOE Issues Final RFP for Idaho Cleanup Project Core March 13, 2015 - 2:00pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709, millerdc@id.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be complete in Idaho and remaining nuclear

  13. Department of Energy Issues Final Request for Proposals for Savannah River

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Liquid Waste Contract | Department of Energy Request for Proposals for Savannah River Site Liquid Waste Contract Department of Energy Issues Final Request for Proposals for Savannah River Site Liquid Waste Contract September 13, 2007 - 2:33pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the release of a final Request for Proposals (RFP) for the competitive selection of a Liquid Waste (LW) contractor for the Savannah River Site (SRS). The resulting

  14. BLM issues final EIS for Tract C-a offsite lease

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    In October, 1986, the US Bureau of Land Management, White River Resource Area, issued the Final Environmental Impact Statement concerning Rio Blanco Oil Shale Company's request to lease an offtract site for disposal of overburden and spent shale from Tract C-a. A major issue which pitted Rio Blanco Oil Shale Company against many other members of the oil shale community was the covering up of oil shale resources on 84 Mesa. The oil shale resource under 84 Mesa may contain as much oil in place as Tract C-a itself. Some of the significant points concerning this issue are discussed. A summary of environmental consequences is given. 5 figures.

  15. DOE Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has issued the Final Environmental Impact Statement for the FutureGen 2.0 Project.

  16. Barriers and Issues Related to Achieving Final Disposition of Depleted Uranium

    SciTech Connect (OSTI)

    Gillas, D. L.; Chambers, B. K.

    2002-02-26

    Approximately 750,000 metric tons (MT) of surplus depleted uranium (DU) in various chemical forms are stored at several Department of Energy (DOE) sites throughout the United States. Most of the DU is in the form of DU hexafluoride (DUF6) that resulted from uranium enrichment operations over the last several decades. DOE plans to convert the DUF6 to ''a more stable form'' that could be any one or combination of DU tetrafluoride (DUF4 or green salt), DU oxide (DUO3, DUO2, or DU3O8), or metal depending on the final disposition chosen for any given quantity. Barriers to final disposition of this material have existed historically and some continue today. Currently, the barriers are more related to finding uses for this material versus disposing as waste. Even though actions are beginning to convert the DUF6, ''final'' disposition of the converted material has yet to be decided. Unless beneficial uses can be implemented, DOE plans to dispose of this material as waste. This expresses the main barrier to DU disposition; DOE's strategy is to dispose unless uses can be found while the strategy should be only dispose as a last resort and make every effort to find uses. To date, only minimal research programs are underway to attempt to develop non-fuel uses for this material. Other issues requiring resolution before these inventories can reach final disposition (uses or disposal) include characterization, disposal of large quantities, storage (current and future), and treatment options. Until final disposition is accomplished, these inventories must be managed in a safe and environmentally sound manner; however, this is becoming more difficult as materials and facilities age. The most noteworthy final disposition technical issues include the development of reuse and treatment options.

  17. DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy, National Nuclear Security Administration (NNSA) has issued the Final Site-Wide Environmental Impact Statement (EIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. This document presents an analysis of the potential environmental impacts of continued management and operation of the NNSS (formerly known as the Nevada Test Site), the Tonopah Test Range, and two locations in Las Vegas, Nevada. The Site-Wide EIS analyzes reasonably foreseeable missions, programs, capabilities, and projects for a 10-year period.

  18. Final Review of Safety Assessment Issues at Savannah River Site, August 2011

    SciTech Connect (OSTI)

    Napier, Bruce A.; Rishel, Jeremy P.; Bixler, Nathan E.

    2011-12-15

    At the request of Savannah River Nuclear Solutions (SRNS) management, a review team composed of experts in atmospheric transport modeling for environmental radiation dose assessment convened at the Savannah River Site (SRS) on August 29-30, 2011. Though the meeting was prompted initially by suspected issues related to the treatment of surface roughness inherent in the SRS meteorological dataset and its treatment in the MELCOR Accident Consequence Code System Version 2 (MACCS2), various topical areas were discussed that are relevant to performing safety assessments at SRS; this final report addresses these topical areas.

  19. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue One of the challenges at Sandia National Laboratories is addressing the issue of predictively connecting the macroscopic properties of metals to their micro- and nanostructure. While this issue may seem straightforward, it is anything but trivial. Materials are intrinsically inhomogeneous, but the relationship between microstructural variability and resulting properties is often unknown. Approach PPM is comprised of a group of multidisciplinary staff, post-docs, and university

  20. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision 14 Job Hazard Analysis Performance and Development Management Control Procedure EFFECTIVE DATE: 03/30/16 Tom Ferguson APPROVED FOR USE WP 12-IS3002 ISSUED WP 12-IS3002 Rev. 14 Page 2 of 22 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 3 INTRODUCTION ............................................................................................................. 4 REFERENCES

  1. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    02/09/16 WP 15-HS.02 Revision 9 Occupational Health Program Cognizant Department: Safety and Health Approved by: Tom Ferguson ISSUED WIPP Occupational Health Program WP 15-HS.02, Rev. 9 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 4 ABBREVIATIONS AND ACRONYMS ............................................................................. 5 PREFACE

  2. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Effective Date: 10/01/15 WP 15-GM.02 Revision 10 Worker Safety and Health Program Description Cognizant Section: Industrial Safety & Health Approved by: Signature on File Phil Breidenbach, President & Project Manager, NWP Approved by: Signature on File Dana Bryson, Acting Manager, CBFO ISSUED Worker Safety and Health Program Description WP 15-GM.02, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 4

  3. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12/01/15 WP 15-GM.03 Revision 9 Integrated Safety Management System Description Cognizant Section: Environmental, Safety and Health Approved by: Signature on File / 11/16/15 Phil Breidenbach, President & Project Manager, NWP Date Approved by: Signature on File / 11/30/15 Todd Shrader Manager, CBFO Date ISSUED Integrated Safety Management System Description WP 15-GM.03, Rev. 9 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY

  4. Personnel supply and demand issues in the nuclear power industry. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    Information is presented concerning engineering, personnel, reactor operators, health physics personnel, competing demands on technical manpower, personnel management issues, and emerging technology.

  5. LM Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has released the Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) to the public. The document can be found on the DOE Office of...

  6. DOE Issues Final Request for Proposals for the West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Final Request for Proposals (RFP) for the West Valley Demonstration Project Supplemental Environmental Impact Statement (WVDP-SEIS) procurement that will provide support to the U.S. Department of Energy’s (DOE) West Valley Demonstration Project (WVDP) and the New York State Energy Research and Development Authority (NYSERDA) in developing a Supplemental Environmental Impact Statement for the WVDP and Western New York Nuclear Service Center.

  7. Department of Energy Issues Final $12.5 Billion Advanced Nuclear Energy Loan Guarantee Solicitation

    Broader source: Energy.gov [DOE]

    WASHINGTON D.C. — Today, the Department of Energy issued the Advanced Nuclear Energy Projects loan guarantee solicitation, which provides as much as $12.5 billion to support innovative nuclear energy projects as a part of the Administration’s all-of-the-above energy strategy.

  8. Fourth SIAM conference on mathematical and computational issues in the geosciences: Final program and abstracts

    SciTech Connect (OSTI)

    1997-12-31

    The conference focused on computational and modeling issues in the geosciences. Of the geosciences, problems associated with phenomena occurring in the earth`s subsurface were best represented. Topics in this area included petroleum recovery, ground water contamination and remediation, seismic imaging, parameter estimation, upscaling, geostatistical heterogeneity, reservoir and aquifer characterization, optimal well placement and pumping strategies, and geochemistry. Additional sessions were devoted to the atmosphere, surface water and oceans. The central mathematical themes included computational algorithms and numerical analysis, parallel computing, mathematical analysis of partial differential equations, statistical and stochastic methods, optimization, inversion, homogenization and renormalization. The problem areas discussed at this conference are of considerable national importance, with the increasing importance of environmental issues, global change, remediation of waste sites, declining domestic energy sources and an increasing reliance on producing the most out of established oil reservoirs.

  9. Final report for the field-reversed configuration power plant critical-issue scoping study

    SciTech Connect (OSTI)

    Santarius, John F.; Mogahed, Elsayed A.; Emmert, Gilbert A.; Khater, Hesham Y.; Nguyen, Canh N.; Ryzhkov, Sergei V.; Stubna, Michael D.; Steinhauer, Loren C.; Miley, George H.

    2001-03-01

    This report describes research in which a team from the Universities of Wisconsin, Washington, and Illinois performed a scoping study of critical issues for field-reversed configuration (FRC) power plants. The key tasks for this research were (1) systems analysis of deuterium-tritium (D-T) FRC fusion power plants, and (2) conceptual design of the blanket and shield module for an FRC fusion core.

  10. Waste compatibility safety issues and final results for tank 241-T-110 push mode samples

    SciTech Connect (OSTI)

    Nuzum, J.L.

    1997-05-15

    This document is the final laboratory report for Tank 241-T-110. Push mode core segments were removed from risers 2 and 6 between January 29, 1997, and February 7, 1997. Segments were received and extruded at 222-S Laboratory. Analyses were performed in accordance with Tank 241-T-110 Push Mode Core Sampling and analysis Plan (TSAP) and Safety Screening Data Quality Objective (DQO). None of the subsamples submitted for total alpha activity (AT) or differential scanning calorimetry (DSC) analyses exceeded the notification limits stated in DQO.

  11. Processing and modeling issues for thin-film solar cell devices. Final report

    SciTech Connect (OSTI)

    Birkmire, R.W.; Phillips, J.E.

    1997-11-01

    During the third phase of the subcontract, IEC researchers have continued to provide the thin film PV community with greater depth of understanding and insight into a wide variety of issues including: the deposition and characterization of CuIn{sub 1-x}Ga{sub x}Se{sub 2}, a-Si, CdTe, CdS, and TCO thin films; the relationships between film and device properties; and the processing and analysis of thin film PV devices. This has been achieved through the systematic investigation of all aspects of film and device production and through the analysis and quantification of the reaction chemistries involved in thin film deposition. This methodology has led to controlled fabrications of 15% efficient CuIn{sub 1-x}Ga{sub x}Se{sub 2} solar cells over a wide range of Ga compositions, improved process control of the fabrication of 10% efficient a-Si solar cells, and reliable and generally applicable procedures for both contacting and doping films. Additional accomplishments are listed below.

  12. DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site Is Preferred for Long-Term Mercury Storage

    Broader source: Energy.gov [DOE]

    WASHINGTON – The Department of Energy has prepared a Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement to analyze the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven locations

  13. Study of integration issues to realize the market potential of OTEC energy in the aluminum industry. Final report

    SciTech Connect (OSTI)

    Jones, Jr., M. S.; Thiagarajan, V.; Sathyanarayana, K.; Markel, A. L.; Snyder, III, J. E.; Sprouse, A. M.; Leshaw, D.

    1980-09-01

    The various integration issues are studied which must be considered to realize the market potential for the use of OTEC by the aluminum industry. The chloride reduction process has been identified as an attractive candidate for use with OTEC systems, and drained-cathode Hall cells and two alternative chloride reduction processes are considered. OTEC power system and plantships for the different processes are described. Aluminum industry characteristics important for OTEC considerations are given, including economic models and case history analyses. Appended are supporting cost estimates and energy bridge concepts for getting OTEC energy to shore. (LEW)

  14. Pantex Plant final safety analysis report, Zone 4 magazines. Staging or interim storage for nuclear weapons and components: Issue D

    SciTech Connect (OSTI)

    Not Available

    1993-04-01

    This Safety Analysis Report (SAR) contains a detailed description and evaluation of the significant environmental, safety, and health (ES&H) issues associated with the operations of the Pantex Plant modified-Richmond and steel arch construction (SAC) magazines in Zone 4. It provides (1) an overall description of the magazines, the Pantex Plant, and its surroundings; (2) a systematic evaluations of the hazards that could occur as a result of the operations performed in these magazines; (3) descriptions and analyses of the adequacy of the measures taken to eliminate, control, or mitigate the identified hazards; and (4) analyses of potential accidents and their associated risks.

  15. Processing Materials Devices and Diagnostics for Thin Film Photovoltaics: Fundamental and Manufacturability Issues; Final Report, 5 September 2001 - 31 May 2008

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20-45545 April 2009 Processing Materials Devices and Diagnostics for Thin Film Photovoltaics: Fundamental and Manufacturability Issues Final Report 1 March 2005 - 30 November 2008 R.W. Birkmire, W.N. Shafarman, E. Eser, S.S. Hegedus, B.E. McCandless, K.D. Dobson, and S. Bowden University of Delaware Newark, Delaware National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy

  16. Agenda of critical issues: coal price and availability. Final report. [Includes effect of legislation, sulfur content and rail transport costs

    SciTech Connect (OSTI)

    Tennican, M.L.; Wayland, R.E.; Weinstein, D.M.

    1984-10-01

    Temple, Barker, and Sloane, Inc. developed an agenda of critical issues regarding future coal prices and coal availability for EPRI. TBS interviewed nearly 50 utility, coal company, and railroad officials, academic experts, and coal consultants; held a one-day participatory workshop; and conducted a literature review and follow-up interviews with selected utilities. TBS found four causes of uncertainty in the utility industry over future coal prices. First, the acid deposition proposals in Congress vary in terms of the structure of the legislation, the costs of compliance, and the impact on coal prices; in turn these uncertainties impede utility fuel planning and decision making. Second, powerplant-specific factors will have a major impact on whether utilities switch or scrub in response to acid deposition legislation; existing analyses do not capture these factors. The most important powerplant-specific factors are matching unit characteristics with coal specifications, retrofit scrubber costs, and differing state regulatory environments. Third, TBS found that utility fuel managers have great uncertainty over the availability and future cost of compliance coal. TBS estimated that the existing production capacity of eastern compliance coal is at least twice as high as current production. Fourth, TBS concluded that uncertainty over future coal transportation rates was a major reason for utilities' uncertainty over future delivered prices of coal. Critical transportation-related issues are the strategic and tactical response of eastern coal producers to the Staggers Act; the impact on rail rates of the sale of Conrail, of possible transcontinental mergers, and of multi-modal mergers; and the future pricing policies that eastern railroads will adopt in response to imports of Colombian coal. 21 references.

  17. Processing Materials Devices and Diagnostics for Thin Film Photovoltaics: Fundamental and Manufacturability Issues; Final Report, 5 September 2001 - 31 May 2008

    SciTech Connect (OSTI)

    Birkmire, R. W.; Shafarman, W. N.; Eser, E.; Hegedus, S. S.; McCandless, B. E.; Dobson, K. D.; Bowden, S.

    2009-04-01

    The critical issues addressed in this study on CIGS, CdTe, and a-Si modules will provide the science and engineering basis for developing viable commercial processes and improved module performance.

  18. Energy Department Issues Green Building Certification System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Issues Green Building Certification System Final Rule to Support Increased Energy Measurement and Efficient Building Design Energy Department Issues Green...

  19. EnergyTodayIssuesFinal4.indd

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... in coal-fired, gas-fired, nuclear, and ... strategy for reducing atmospheric carbon ... power generated by coal in the country comes from plants that burn ...

  20. BPA issues final decision on oversupply rate

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is consistent with our multiple statutory responsibilities, is rooted in the basic principles of cost causation and fairness that underlie BPA's rate directives, and...

  1. All Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AlumniLink » All Issues All Issues Bi-monthly publication connecting our alumni with news, information and former colleagues from the Lab. Archive - 2015 September July May March January Archive - 2014 November September June Publications 1663 Actinide Research Quarterly (ARQ) AlumniLink Publications Archive Connections National Security Science VISTAS

  2. EA-1611-S1: Final Supplemental Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a final supplemental...

  3. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using house July 6, 2012 Description There have been a lot of issues recently with NFS hangs on the gpint machines. The origin of the gpint hanging has been determined to be...

  4. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Grindstaff, DOE-ORP Ginger Wireman, Ecology Sharon Braswell, MSA Steve Pfaff, DOE-ORP Hillary Johnson, EnviroIssues Abby Chazanow, EnviroIssues Final Meeting Summary Page 16 Tank ...

  5. EIS-0496: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0496: Final Environmental Impact Statement San ... and state lead agencies, issued a final EISEnvironmental Impact Report that assesses ...

  6. EA-1979: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1979: Final Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a final EA that ...

  7. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Issues Open Issues The /scratc3 performance degradation after GridRaid upgrade April 7, 2016 The Edison /scratch3 file system was upgraded to Grid Raid from MDRaid during the move to the CRT building (Dec, 2015). This upgrade was recommended by the vendors because it greatly enhances the drive rebuild time and write performance when compared to the traditional MDRaid that was deployed on Edison /scratch3 file system before the move (The /scratch1 and /scratch2 file systems are still in

  8. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Issues Open Issues runtime error message: "readControlMsg: System returned error Connection timed out on TCP socket fd" June 30, 2015 Symptom User jobs with sinlge or multiple apruns in a batch script may get this run time error: "readControlMsg: System returned error Connection timed out on TCP socket fd". This problem is intermittent, sometimes resubmit works. This error message started to appear after the Hopper OS upgrade to CLE52UP02 on March 11, 2015. Read the full

  9. Issues in Midterm Analysis and Forecasting

    Reports and Publications (EIA)

    1999-01-01

    Final issue of this report. Presents a series of eight papers, which cover topics in analysis and modeling that underlie the Annual Energy Outlook 1999, as well as other significant issues in midterm energy markets.

  10. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2012 Resolved: Reports of Hanging Jobs on Hopper March 1, 2012 by Katie Antypas Issue: A number of users have reported intermittent large jobs hanging on Hopper. A job appears to start and then hangs shortly after producing no output. The job stops when the wall clock limit has been reached

  11. Energy Department Issues Green Building Certification System...

    Energy Savers [EERE]

    Green Building Certification System Final Rule to Support Increased Energy Measurement and Efficient Building Design Energy Department Issues Green Building Certification System ...

  12. Safety Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Safety Orientation April, 2015 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Site Safety Orientation Purpose This document provides an overview and summary of safety issues and safe work practices associated with operations at the Atmospheric Radiation Measurement Climate Research Facility/North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Sites. It is intended for site visitors as well as routine site

  13. President Issues

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    President Issues Executive Order on Alternative Fuels On December 13, 1996, President Clinton signed Exec- utive Order 13031, which calls on each Federal agency to develop and implement ways to meet the alternative fuel vehicle (AFV) acquisition requirements of the Energy Policy Act (EPAct) of 1992. The executive order requires each agency to submit detailed reports within 60 days of the signing of the order to the Office of Management and Budget detailing its compliance with the EPAct sections

  14. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2011 "Unable to open kgni version file /sys/class/gemini/kgni0/version" error April 13, 2011 by Helen He Symptom: Dynamic executables built with compiler wrappers running directly on the external login nodes are getting the following error message: Read the full post Resolved -- Default version not shown in "module avail module_name" command April 13, 2011 by Helen He Symptom: The default software version is not shown when "module avail module_name" is issued.

  15. Issue: K

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue: K Author: Mark D. Ivey Page 1 of 24 DR 6 / 30 / 2010 ES&H STANDARD OPERATING PROCEDURE (ES&H SOP) Title: ATMOSPHERIC RADIATION MEASUREMENT CLIMATE RESEARCH FACILITY/NORTH SLOPE OF ALASKA/ADJACENT ARCTIC OCEAN (ACRF/NSA/AAO) PROJECT OPERATING PLAN (U) Location: North Slope of Alaska and Adjacent Arctic Ocean Owners: Mark D Ivey, Department 6383, Manager Mark D Ivey, Department 6383, ACRF/NSA/AAO Site Project Manager and Site ES&H Coordinator Document Release or Change History:

  16. EA-1955: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1955: Final Environmental Assessment Campbell County Wind Farm; Campbell County, South Dakota Western Area Power Administration (Western) issued a ...

  17. EA-1995: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessment EA-1995: Final Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  18. EA-1975: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1975: Final Environmental Assessment Linac Coherent Light Source-IL, SLAC National Accelerator Laboratory, Menlo Park, California DOE issued a ...

  19. Final Optics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    final optics Final Optics Schematic layout of NIF's final optics assembly (FOA). The suite of optics for one beamline is on the right. The final optics assemblies (FOAs) are the last element of the main laser system and the first of the target area systems. Each FOA contains four integrated optics modules (IOMs) that incorporate beam conditioning, frequency conversion, focusing, diagnostic sampling, and debris shielding capabilities into a single compact assembly. These optics are shown in the

  20. FINAL REPORT

    Office of Scientific and Technical Information (OSTI)

    FINAL REPORT Analytical and Elemental Analysis of Air and Soil Samples Facility and Public ... Information 4 Background 5 Stormwater Pollution 5 Erosion and Sediment Control Workshop ...

  1. FINAL RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELEASE AWARDEE: ____________________________________________________ The work under Award No. DE-__________________________, dated ______________, between the United States of America (represented by the Department of Energy, National Energy Technology Laboratory, and the undersigned awardee, having been completed and finally accepted , and in consideration of Final Payment thereunder, the United States of America, its officers, agents and employees are hereby released from all liabilities,

  2. No Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Problems » No Open Issues No Open Issues There are currently no open issues with Euclid. Subscribe via RSS Subscribe Browse by Date January 2016 Last edited: 2011-03-15 10:01:46

  3. Final Report

    SciTech Connect (OSTI)

    Gurney, Kevin R

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  4. Final Report

    SciTech Connect (OSTI)

    Biros, George

    2014-08-18

    This the final report for the project "Large-Scale Optimization for Bayesian Inference in Complex Systems," for the work in the group of the co-PI George Biros.

  5. Final Report

    SciTech Connect (OSTI)

    DeTar, Carleton

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  6. Welcome to this Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Welcome National Security Science Latest Issue:April 2016 past issues All Issues » submit Welcome to this Issue Los Alamos National Laboratory has been at the forefront of high explosives research since the Manhattan Project, says Bob Webster, Principal Associate Director, Weapons Programs. March 22, 2016 Welcome to this Issue Bob Webster (Photo: Los Alamos) Contact Managing Editor Clay Dillingham Email Here's to another year of noteworthy accomplishments and continued excellence in 2016.

  7. Past Issues | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inquiry Magazine Past Issues To view past issues of Inquiry magazine, click on the links below. Inquiry 2015, Issue 1 Inquiry 2014, Issue 2 Inquiry 2014, Issue 1 Image Inquiry 2013, Issue 2 Image Inquiry 2013, Issue 1 Image Inquiry 2012. Issue 2 Image Inquiry 2012, Issue 1 Image Inquiry 2011, Issue 2 Image Inquiry 2011, Issue 1 Image Inquiry 2010, Issue 2 Image Inquiry 2010, Issue 1 Inq10-1cover.jpg

  8. Front Burner- Issue 15

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 15 addresses the DOE eSCRM Program and Secure Online Shopping.

  9. Connections: All Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Connections Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Community Connections Monthly news and opportunities for the Laboratory's neighbors and friends, with a primary focus on economic development, education and community giving. All Issues Connections Newsletter September 2016 September 2016 Great opportunity for Native American-owned businesses; 900 backpacks donated to local

  10. Front Burner- Issue 14

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 14 highlights the 2013 National Cybersecurity Awareness Month (NCSAM) Campaign and Phishing Scams.

  11. Final Report

    SciTech Connect (OSTI)

    Marchant, Gary E.

    2013-04-23

    This is the final report of a two year project entitled "Governing Nanotechnology Risks and Benefits in the Transition to Regulation: Innovative Public and Private Approaches." This project examined the role of new governance or "soft law" mechanisms such as codes of conduct, voluntary programs and partnership agreements to manage the risks of emerging technologies such as nanotechnology. A series of published or in publication papers and book chapters are attached.

  12. DOE Issues RFP for Waste Treatment Services | Department of Energy

    Office of Environmental Management (EM)

    Greater-Than-Class C Waste | Department of Energy Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term

  13. EM_newsletter_IssueNo9_final.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... SRR is a team of companies led by URS Corp. that includes partners Bechtel National, CH2M Hill and Babcock & Wilcox. The teachers who submitted the winning proposals for Savannah ...

  14. DOE Issues Final Request for Proposal for Oak Ridge Transuranic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (NAICS) Code 562211, Hazardous Waste Treatment and Disposal. ... and disposition of TRU soil and debris waste; ... the Oak Ridge National Laboratory; and processing Nuclear ...

  15. Memorandum, Final Credentialing Standards for Issuing PIV Cards...

    Broader source: Energy.gov (indexed) [DOE]

    Policy Flash 2013-33 Department of Energy Order 206.2 Identity, Credential and Access Managment (ICAM) Headquarters Facilities Master Security Plan - Chapter 1, Physical Security...

  16. DOE Issues Final Rule on Loan Guarantees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    provide loan guarantees to projects with multiple participants. As an example, export credit agencies and other financial institutions will now be able to provide financing to...

  17. DOE Issues Final Rule for Alternative Efficiency Determination...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    regulations governing the use of particular methods as alternatives to testing for commercial heating, ventilating, air-conditioning, water heating, and refrigeration equipment. ...

  18. Department of Energy Issues Final Rule on Loan Guarantees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    more projects at a better value to taxpayers," said ... As an example, export credit agencies and other financial ... This approach will result in lowered risk and potential ...

  19. Final Notice of Violation issued to Los Alamos National Security...

    Broader source: Energy.gov (indexed) [DOE]

    ... measures required for some limited categories of classified information (e.g. , Top Secret and special access programs). 12 However, the lack of additional administrative ...

  20. CORAL Fact Sheet__FINAL AS ISSUED_UPDATED

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fact S heet: Collaboration o f O ak R idge, A rgonne, a nd L ivermore ( CORAL) The C ollaboration o f O ak R idge, A rgonne, a nd L ivermore ( CORAL) i s a j oint p rocurement activity a mong t hree o f t he D epartment o f E nergy's N ational L aboratories launched i n 2 014 to b uild s tate---of---the---art h igh---performance c omputing t echnologies t hat a re e ssential f or supporting U.S. national nuclear security a nd a re k ey t ools u sed f or t echnology advancement a nd s cientific

  1. Final Report

    SciTech Connect (OSTI)

    R Paul Drake

    2004-01-12

    OAK-B135 This is the final report from the project Hydrodynamics by High-Energy-Density Plasma Flow and Hydrodynamics and Radiation Hydrodynamics with Astrophysical Applications. This project supported a group at the University of Michigan in the invention, design, performance, and analysis of experiments using high-energy-density research facilities. The experiments explored compressible nonlinear hydrodynamics, in particular at decelerating interfaces, and the radiation hydrodynamics of strong shock waves. It has application to supernovae, astrophysical jets, shock-cloud interactions, and radiative shock waves.

  2. Final Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    352 Regulatory and Utility Solutions to Advance SunShot Initiative Goals Interstate Renewable Energy Council, Inc. FINAL REPORT Project Title: "Regulatory and Utility Solutions to Advance SunShot Initiative Goals" Covering Period: 09/01/11 through 02/28/15 Date of Report: 04/20/2015 Recipient: Interstate Renewable Energy Council, Inc. (IREC) Award Number: DE-EE0005352 Working Partners: Keyes, Fox & Wiedman LLP Michael T. Sheehan Sherwood Associates, Inc. Kris Mayes Law Firm (KMLF)

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 15, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE March 15, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Waste Treatment Plant (WTP) Progress and Communication Approach (Joint w/PIC) .............................. 2 Issue Manager Update on Cesium Management Resulting from Low Activity Waste

  4. Final Report

    SciTech Connect (OSTI)

    Yelton, John Martin; Mitselmakher, Guenakh; Korytov, Andrey; Avery, Paul; Furic, Ivan; Acosta, Darin; Konigsberg, Jacobo; Field, Richard; Matchev, Konstantin; Ramond, Pierre; Thorn, Richard; Sikivie, Pierre; Ray, Heather; Tanner, David

    2013-10-10

    We report on progress in a series of different directions within high energy physics research. 1. Neutrino research in hardware and software on the Minerva and MiniBooNE experiments 2. Experimental particle physics at the hadron colliders, with emphasis on research and development and data analysis on the CMS experiment operating at the CERN LHC. This includes research on the discovery and properties on the Higgs Boson. 3. Educational outreach through the Quarknet program, taking physics research into High School classrooms. 4. Theoretical and Phenomenological High Energy research, covering a broad range of activities ranging from fundamental theoretical issues to areas of immediate phenomenological importance. 5. Experiment searches for the Axion, as part of the ADMX experiment.

  5. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect (OSTI)

    Gravois, Melanie

    2007-06-27

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  6. Front Burner- Issue 13

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 13 contained a message from the Associate Chief Information Officer (ACIO) for Cybersecurity as well as a listing of recommended cybersecurity practices.

  7. Tribal Utility Policy Issues

    Broader source: Energy.gov (indexed) [DOE]

    ... Coal Combustion Residuals Regulation Act of 2015 (H.R. 1734) FCC's Connect America Funding to provide broadband to rural communities Gas Utility Issues Pipeline Safety & ...

  8. Front Burner- Issue 16

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 16 addresses Malware, the Worst Passwords of 2013, and the Flat Stanley and Stop.Think.Connect. Campaign.

  9. Front Burner- Issue 18

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 18 addresses keeping kids safe on the Internet, cyber crime, and DOE Cyber awareness and training initiatives.

  10. FRONT BURNER- ISSUE 19

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 19 examines Securing the Internet of Things, Facebook Messenger Application, and implementation of the Contractor Training Site.

  11. Final Rule on Amending Eligibility Provisions to Multifamily...

    Energy Savers [EERE]

    March 2, 2010 SUBJECT: FINAL RULE ON AMENDING ELIGIBILITY PROVISIONS TO MULTI-FAMILY BUILDINGS FOR THE WEATHERIZATION ASSISTANCE PROGRAM PURPOSE: To issue guidance on implementing...

  12. Final Report

    SciTech Connect (OSTI)

    Sujit Banerjee

    2005-12-15

    Contaminants present in paper recycling mills can degrade product properties and can also lead to substantial downtime. Of these, adhesive material such as hot melts and pressure sensitive adhesives are especially troublesome. These are known as ?¢???? stickies ?¢??? and their handling and re- moval requires process equipment such as screens and cleaners as well as chemical additives. In the preceding phase of the project we demonstrated that firing an underwater spark in a tank of stock reduces the tack of the stickies and reduces their impact. The present phase was to demon- strate the technology in full-scale trials, address any issues that might arise, and commercialize the process. Trials were run at the Appleton papers mill in West Carrollton, OH, the Graphics Packag- ing mill at Kalamazoo, MI, Stora Enso mills at Duluth, MN, and Wisconsin Rapids, WI, and the Jackson Paper mill at Sylva, NC. It was shown that the sparker not only detackified stickies but also increased the efficiency of their removal by centrifugal cleaners, improved the effectiveness of dissolved air flotation, and increased the efficiency of flotation deinking. It is estimated that the sparker improves the efficiency of hydrocyclone cleaner, deinking cells and dissolved and dispersed air flotation units by 10-15%. This translates to a corresponding energy benefit in operating these units. The technology has been licensed to Eka Chemicals, a division of Akzo Nobel.

  13. Final Report

    SciTech Connect (OSTI)

    Webb, Robert C.; Kamon, Teruki; Toback, David; Safonov, Alexei; Dutta, Bhaskar; Dimitri, Nanopoulos; Pope, Christopher; White, James

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  14. Final Report

    SciTech Connect (OSTI)

    Gentile, Thomas R.

    2014-03-14

    We propose to extend the technique of polarized neutron scattering into new domains by continued development and application of polarized 3He spin-filters. These devices are particularly relevant to the Spallation Neutron Source, as the polarizing monochromators historically used at reactor sources will usually not be suitable polarizers, and wide-angle polarization analysis will be essential. With prior support from the Office of Science, we have developed neutron spin-filters based on the large spin dependence of the cross section for neutron capture by 3He, and applied these devices to a small angle neutron scattering spectrometer (SANS), polarized neutron reflectometers, a thermal energy single crystal diffractometer (SCD), and a thermal energy triple-axis instrument. Our developments have been adopted for application on the magnetism reflectometer at the SNS and for the NIST Center for Neutron Research (NCNR) 3He user capability. Results from both these programs are emerging. We have made significant progress in the past grant period on wide-angle polarization analysis. We have also performed several studies relevant to continuous optical pumping, including collaboration on experiments that have revealed neutron beam effects on spin filters that are continuously pumped by spin-exchange optical pumping. We contributed to an experiment on a neutron interferometer, in which the successful results obtained are directly related to both 3He cell technology and high accuracy 3He -based neutron polarimetry. Implementation of wide-angle polarization analysis will continue to be key thrust for our work in this new proposal. We will also focus on continuous optical pumping and the fundamental issues that determine the achievable 3He polarization. This project will be carried out by a collaboration involving scientists at NIST, Indiana University, Hamilton College, and the Univ. of Wisconsin who are experts in 3He polarization techniques, and materials scientists from the

  15. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070,...

  16. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Enforcement issued Notices of Noncompliance Determinations to Midea America Corporation and Felix Storch, Inc. for a compact freezer that, as determined by...

  17. Community Issues - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In recent months, significant SRS-related community issues have included the Department of Energy's decision to abandon its long-standing commitment to Yucca Mountain in Nevada as ...

  18. Rule Issued to Prohibit Importation of Products that Fail To...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the U.S. Customs and Border Protection ("CBP") and the U.S. Department of the Treasury issued a final rule last week that allows CBP to refuse admission into the customs territory ...

  19. Final report

    SciTech Connect (OSTI)

    Joseph H. Simmons; Tracie J. Bukowski

    2002-08-07

    This grant was a continuation of research conducted at the University of Florida under Grant No. DE-FG05-91ER45462 in which we investigated the energy bandgap shifts produced in semiconductor quantum dots of sizes between 1.5 and 40 nm. The investigated semiconductors consisted of a series of Column 2-6 compounds (CdS, CdSe, CdTe) and pure Column IV elements (Si and Ge). It is well-known of course that the 2-6 semiconductors possess a direct-gap electronic structure, while the Column IV elements possess an indirect-gap structure. The investigation showed a major difference in quantum confinement behavior between the two sets of semiconductors. This difference is essentially associated with the change in bandgap energy resulting from size confinement. In the direct-gap semiconductors, the change in energy (blue shift) saturates when the crystals approach 2-3 nm in diameter. This limits the observed shift in energy to less than 1 eV above the bulk value. In the indirect-gap semiconductors, the energy shift does not show any sign of saturation and in fact, we produced Si and Ge nanocrystals with absorption edges in the UV. The reason for this difference has not been determined and will require additional experimental and theoretical studies. In our work, we suggest, but do not prove that mixing of conduction band side valleys with the central valley under conditions of size confinement may be responsible for the saturation in the blue-shift of direct-gap semiconductors. The discovery of large bandgap energy shifts with crystal size prompted us to suggest that these materials may be used to form photovoltaic cells with multi-gap layers for high efficiency in a U.S. Patent issued in 1998. However, this possibility depends strongly on the ability to collect photoexcited carriers from energy-confined crystals. The research conducted at the University of Arizona under the subject grant had a major goal of testing an indirect gap semiconductor in size-confined structures to

  20. MIST final report

    SciTech Connect (OSTI)

    Gloudemans, J.R. )

    1991-08-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock Wilcox. The unique features of the Babcock Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to addresss the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST program is reported in eleven volumes; Volumes 2 through 8 pertain to groups of Phase 3 tests by type, Volume 9 presents inter-group comparisons. Volume 10 provides comparisons between the RELAP5 MOD2 calculations and MIST observations, and Volume 11 (with addendum) presents the later, Phase 4 tests. This is Volume 1 of the MIST final report, a summary of the entire MIST program. Major topics include: test advisory grop (TAG) issues; facility scaling and design; test matrix; observations; comparisons of RELAP5 calculations to MIST observations; and MIST versus the TAG issues. 11 refs., 29 figs., 9 tabs.

  1. Final Report to DOE

    SciTech Connect (OSTI)

    Ismail Gultepe

    2012-05-15

    This final report summarizes the accomplished goals and provide a list of the publications and presentations made during the project. The goals of the project were accomplished through the various publications submitted to Journals and presentations done at the DOE and international meetings and conferences. The 8 journal articles related to the goals of this project were accepted or submitted. The 23 presentations related to goals of the project were presented at the meetings. There were some minor changes regarding to project goals because of issues encountered during the analysis of the data. For example, a total water probe sensor mounted on the Convair-580 that can be used for defining mixed phase conditions and parameterization, had some problems to estimate magnitude of total water mass, and this resulted in issues providing an accurate parameterization for cloud fraction. Variability related aerosol number concentrations and their composition for direct and indirect effects were studied and published. Results were given to explain aerosol and ice microphysical effects on climate change studies. It is suggested that developed parameterizations should consider the variability in aerosol and ice parameters over the Arctic regions.

  2. DOE Issues Environmental Assessment on Road Project for Public Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issues 88th Lessons Learned Quarterly Report DOE Issues 88th Lessons Learned Quarterly Report September 1, 2016 - 2:59pm Addthis The 88th Lessons Learned Quarterly Report highlights the Council on Environmental Quality final guidance on climate change, U.S. Fish and Wildlife Service migratory bird training, an updated Environmental Protection Agency screening tool for environmental justice analysis, and contributions by our summer interns. Addthis Related Articles DOE Issues 86th Lessons Learned

  3. FRONT BURNER- Issue 20

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 20 examines Phishing to include defining Phishing and related terms and how to protect yourself from this very common and clever security threat. The newsletter also addresses wireless networks, supply chains, training events, and readily available cybersecurity resources. Stay cyber informed and check it out!

  4. JPRS report proliferation issues

    SciTech Connect (OSTI)

    1991-11-18

    This report contains foreign media information on issues related to worldwide proliferation and transfer activities in nuclear, chemical, and biological weapons, including delivery systems and the transfer of weapons relevant technologies. The following locations are included: (1) China; (2) Indonesia; (3) Bulgaria; (4) Brazil, Cuba; (5) Egypt, India, Iran, Iraq, Israel, Pakistan; (6) Soviet Union; and (7) France, Germany, United Kingdom, Italy, Norway.

  5. Environmental Compliance Issue Coordination

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1993-01-07

    To establish the Department of Energy (DOE) requirements for coordination of significant environmental compliance issues to ensure timely development and consistent application of Departmental environmental policy and guidance. Cancels DOE O 5400.2. Para. 5a(2) and 5a(7) canceled by DOE O 231.1.

  6. Small Business Issues for Environmental Restoration Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement

  7. DOE - NNSA/NSO -- SiteLines - Issue 138

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July/August 2009 - Issue 138 A publication for all members of the NNSA/NSO family Final Transuranic Waste Shipment Leaves Nevada Test Site Workers in protective equipment remove a glovebox section after cutting open an oversized box. The final shipment of legacy transuranic waste departed the Nevada Test Site (NTS) on July 9, 2009 en route to the Idaho National Laboratory. This final shipment wraps up a monumental 35-year management, characterization, and repackaging effort by the U.S.

  8. Issue Development sheet Blank

    Broader source: Energy.gov [DOE]

    ISSUE DEVELOPMENT SHEET INFORMATION ONLY The information provided below indicates that a potential concern for finding has been identified. Please provide any objective evidence you may have that could either alleviate the concern or eliminate the finding. If no objective evidence is available/can be provided by the end of this audit (at the scheduled end of field work), this information will be included in the audit report and reported as a concern or an audit finding as appropriate.

  9. Issues Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    IMTool performs the following: • The IMTool can manage issues, actions, and activities from one screen. • Provides enhanced and intuitive searching, sorting, and filtering capabilities. Grids allow for filtering any column instantly by any data heading. • IMTool uses drop-down menus to ensure date is entered accurately with consistency. • User-friendly system – highly utilized commitment tracking screen functions. Information is viewed on the left side of the screen and managed on the right.

  10. JPRS report proliferation issues

    SciTech Connect (OSTI)

    1991-12-02

    This report contains foreign media information on issues related to worldwide proliferation and transfer activities in nuclear, chemical, and biological weapons, including delivery systems and the transfer of weapons relevant technologies. The following locations are included: (1) South Africa; (2) China; (3) North and South Korea, Taiwan; (4) Hungary, Yugoslavia; (5) Brazil, Argentina; (6) Afghanistan, India, Iran, Iraq, Israel, Pakistan; (7) Soviet Union; and (8) France, Germany, Italy, Switzerland.

  11. JPRS report proliferation issues

    SciTech Connect (OSTI)

    1991-12-13

    This report contains foreign media information on issues related to worldwide proliferation and transfer activities in nuclear, chemical, and biological weapons, including delivery systems and the transfer of weapons relevant technologies. The following locations are included: (1) South Africa; (2) China; (3) North and South Korea, Taiwan; (4) Hungary; (5) Brazil; (6) India, Iran, Israel, Pakistan; (7) Soviet Union; and (8) Austria, Germany, United Kingdom.

  12. Issue Development sheet Example

    Broader source: Energy.gov [DOE]

    ISSUE DEVELOPMENT SHEET INFORMATION ONLY The information provided below indicates that a potential concern for finding has been identified. Please provide any objective evidence you may have that could either alleviate the concern or eliminate the finding. If no objective evidence is available/can be provided by the end of this audit (at the scheduled end of field work), this information will be included in the audit report and reported as a concern or an audit finding as appropriate.

  13. Also In This Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In This Issue ■ Annual review assesses the state of science and technology in NMT Division ■ Technology transfer between Savannah River and the national labs ■ Plutonium Futures conference speakers set ■ Mary Neu is intrigued by actinides ■ "Eye of the Beholder" N u c l e a r M a t e r i a l s R e s e a r c h a n d T e c h n o l o g y Quarterly Actinide Research Researchers cast first "spiked" plutonium alloy 2nd quarter 2002 Nuclear Materials Technology Division

  14. Tribal Utility Policy Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Policy Issues New Mexico July 27, 2015 Margaret Schaff Kanim Associates, LLC (An Indian Owned Consulting Firm) 303-443-0182 mschaff@att.net *US Energy Information Administration New Mexico Energy Stats  Sixth in crude oil production in the nation in 2013.  5% of U.S. marketed natural gas production in 2012  Largest coal-fired electric power plants in NM both on Navajo Nation  2,100-megawatt Four Corners (Navajo Mine) (APS)  1,643-megawatt San Juan (San Juan Mines) (Public

  15. Environmental issues in China

    SciTech Connect (OSTI)

    Travis, P.S.

    1991-10-01

    Global concern about the environment is increasing, and the People's Republic of China (PRC) is not immune from such concerns. The Chinese face issues similar to those of many other developing nations. The US Department of Energy is particularly interested in national and world pollution issues, especially those that may infringe on other countries' economic growth and development. The DOE is also interested in any opportunities that might exist for US technical assistance and equipment in combating environmental problems. Our studies of articles in the China Daily, and English-language daily newspaper published by the Chinese government, show that population, pollution, and energy are major concerns of the Chinese Communist Party. Thus this report emphasizes the official Chinese government view. Supporting data were also obtained from other sources. Regardless of the severity of their various environmental problems, the Chinese will only try to remedy those problems with the greatest negative effects on its developing economy. They will be looking for foreign assistance, financial and informational, to help implement solutions. With the Chinese government seeking assistance, the United States has an opportunity to export basic technical information, especially in the areas of pollution control and monitoring, oil exploration methods, oil drilling technology, water and sewage treatment procedures, hazardous waste and nuclear waste handling techniques, and nuclear power plant safety procedures. In those areas the US has expertise and extensive technical experience, and by exporting the technologies the US would benefit both economically and politically. 59 refs., 3 figs.

  16. Reformulated gasoline quality issues

    SciTech Connect (OSTI)

    Gonzalez, R.G.; Felch, D.E.; Edgar, M.D.

    1995-11-01

    One year ago, a panel of industry experts were interviewed in the November/December 1994 issue of Fuel Reformulation (Vol. 4, No. 6). With the focus then and now on refinery investments, the panelists were asked to forecast which refining processes would grow in importance. It is apparent from their response, and from other articles and discussions throughout the year, that hydroprocessing and catalytic conversion processes are synergistic in the overall refinery design, with flexibility and process objectives varying on a unit-by-unit case. To an extent, future refinery investments in downstream petrochemicals, such as for paraxylene production, are based on available catalytic reforming feedstock. Just a importantly, hydroprocessing units (hydrotreating, hydrocracking) needed for clean fuel production (gasoline, diesel, aviation fuel), are heavily dependent on hydrogen production from the catalytic reformer. Catalytic reforming`s significant influence in the refinery hydrogen balance, as well as its status as a significant naphtha conversion route to higher-quality fuels, make this unit a high-priority issue for engineers and planners striving for flexibility.

  17. EA-1946: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1946: Final Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration (BPA) issued a Final EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. The Final EA consists of comments received on the draft EA and responses to the

  18. Simulations of neutralized final focus

    SciTech Connect (OSTI)

    Welch, D.R.; Rose, D.V.; Genoni, T.C.; Yu, S.S.; Barnard, J.J.

    2005-01-18

    In order to drive an inertial fusion target or study high energy density physics with heavy ion beams, the beam radius must be focused to < 3 mm and the pulse length must be compressed to < 10 ns. The conventional scheme for temporal pulse compression makes use of an increasing ion velocity to compress the beam as it drifts and beam space charge to stagnate the compression before final focus. Beam compression in a neutralizing plasma does not require stagnation of the compression, enabling a more robust method. The final pulse shape at the target can be programmed by an applied velocity tilt. In this paper, neutralized drift compression is investigated. The sensitivity of the compression and focusing to beam momentum spread, plasma, and magnetic field conditions is studied with realistic driver examples. Using the 3D particle-in-cell code, we examine issues associated with self-field generation, stability, and vacuum-neutralized transport transition and focusing.

  19. Final Rule (December 4, 2009)

    Broader source: Energy.gov [DOE]

    Loan Guarantees for Projects that Employ Innovative Technologies: On October 23, 2007, the Department of Energy published a final rule establishing regulations for the loan guarantee program authorized by Section 1703 of Title XVII of the Energy Policy Act of 2005. Section 1703 of Title XVII authorizes the Secretary of Energy to make loan guarantees for projects that “avoid, reduce, or sequester air pollutants or anthropogenic emissions of greenhouse gases; and employ new or significantly improved technologies as compared to commercial technologies in service in the United States at the time the guarantee is issued.”

  20. Small Business Issues for Environmental Restoration Acquisitions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions ...

  1. THE FIRST VERY LONG BASELINE INTERFEROMETRY IMAGE OF A 44 GHz METHANOL MASER WITH THE KVN AND VERA ARRAY (KaVA)

    SciTech Connect (OSTI)

    Matsumoto, Naoko; Hirota, Tomoya; Honma, Mareki; Kameya, Osamu; Sunada, Kazuyoshi; Sugiyama, Koichiro; Motogi, Kazuhito; Kim, Kee-Tae; Kim, Mikyoung; Byun, Do-Young; Jung, Taehyun; Kim, Jongsoo; Lyo, A-Ran; Oh, Chungsik; Bae, Jaehan; Chung, Hyunsoo; Chung, Moon-Hee; Cho, Se-Hyung; Chibueze, James O.; Shino, Nagisa; and others

    2014-07-01

    We have carried out the first very long baseline interferometry (VLBI) imaging of a 44 GHz class I methanol maser (7{sub 0}-6{sub 1} A {sup +}) associated with a millimeter core MM2 in a massive star-forming region IRAS 18151–1208 with KaVA (KVN and VERA Array), which is a newly combined array of KVN (Korean VLBI Network) and VERA (VLBI Exploration of Radio Astrometry). We have succeeded in imaging compact maser features with a synthesized beam size of 2.7 milliarcseconds × 1.5 milliarcseconds (mas). These features are detected at a limited number of baselines within the length of shorter than ≈ 650 km corresponding to 100 Mλ in the uv-coverage. The central velocity and the velocity width of the 44 GHz methanol maser are consistent with those of the quiescent gas rather than the outflow traced by the SiO thermal line. The minimum component size among the maser features is ∼5 mas × 2 mas, which corresponds to the linear size of ∼15 AU × 6 AU assuming a distance of 3 kpc. The brightness temperatures of these features range from ∼3.5 × 10{sup 8} to 1.0 × 10{sup 10} K, which are higher than the estimated lower limit from a previous Very Large Array observation with the highest spatial resolution of ∼50 mas. The 44 GHz class I methanol maser in IRAS 18151–1208 is found to be associated with the MM2 core, which is thought to be less evolved than another millimeter core MM1 associated with the 6.7 GHz class II methanol maser.

  2. Near-Final Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by senior DOE Officials o Q&A (time permitting) * Around-the-room introductions 9:00 Framing the Issues * Three presentations on key issues * Facilitated discussion 10:15 BREAK ...

  3. Advocate- Issue 47- July 2012

    Broader source: Energy.gov [DOE]

    Here are some of the topics from this issue: Wild West Tour, EM SSAB Chairs’ Meeting, and Reservation Updates.

  4. Site mitigation issues along the Alameda Corridor

    SciTech Connect (OSTI)

    Ripaldi, C.P.

    1996-12-31

    The Alameda Corridor is a consolidated railroad link between the Ports of Los Angeles and Long Beach and the regional and national rail systems linking the nation. A joint Environmental Impacts Report/Environmental Impact Statement (EIR/EIS) was prepared for the project. The Final EIS was issued in February 1996, and a record of decision was issued in May, 1996. Various Phase 1 and Phase 2 Environmental Site Assessments have provided extensive historical documentation of environmental contamination in the vicinity of the Alameda Corridor Transportation Project. A Site Mitigation Master Plan provides guidance and direction for the clean-up activities. Samples will be analyzed for metals, PCB`s TRPH, BTEX, and VOCs.

  5. Radioactive waste storage issues

    SciTech Connect (OSTI)

    Kunz, D.E.

    1994-08-15

    In the United States we generate greater than 500 million tons of toxic waste per year which pose a threat to human health and the environment. Some of the most toxic of these wastes are those that are radioactively contaminated. This thesis explores the need for permanent disposal facilities to isolate radioactive waste materials that are being stored temporarily, and therefore potentially unsafely, at generating facilities. Because of current controversies involving the interstate transfer of toxic waste, more states are restricting the flow of wastes into - their borders with the resultant outcome of requiring the management (storage and disposal) of wastes generated solely within a state`s boundary to remain there. The purpose of this project is to study nuclear waste storage issues and public perceptions of this important matter. Temporary storage at generating facilities is a cause for safety concerns and underscores, the need for the opening of permanent disposal sites. Political controversies and public concern are forcing states to look within their own borders to find solutions to this difficult problem. Permanent disposal or retrievable storage for radioactive waste may become a necessity in the near future in Colorado. Suitable areas that could support - a nuclear storage/disposal site need to be explored to make certain the health, safety and environment of our citizens now, and that of future generations, will be protected.

  6. SUSTAINABILITY NEWS SPO Issues Conditional Award Notices to SPOFOA Projects

    Energy Savers [EERE]

    SPO Issues Conditional Award Notices to SPOFOA Projects The Sustainability Performance Office recently issued conditional award notices to project applications submitted to the SPO Funding Opportunity Announcement. In total, over sixty applications were received through the inaugural program, covering improvements to facility energy use, greenhouse gas emissions, renewable energy, potable water use, and high performance sustainable buildings (HPSB). Final awards will be completed in the coming

  7. EIS-0511: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Final EIS with 10 cooperating agencies, including DOE, for the proposed Aguirre Offshore GasPort Project. ...

  8. EA-1941: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Final EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission ...

  9. Full Final Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPOR FULL FINAL REPOR T T SECTION III SECTION III FULL FINAL REPORT SECTION III Individual Project Summaries Table of Contents Algal Biology ..................................................................................................3 Cultivation ...................................................................................................41 Harvesting and Extraction .............................................................................65 Fuel Conversion

  10. NIST Finalizes Initial Set of Smart Grid Cyber Security Guidelines |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Finalizes Initial Set of Smart Grid Cyber Security Guidelines NIST Finalizes Initial Set of Smart Grid Cyber Security Guidelines September 2, 2010 - 3:15pm Addthis WASHINGTON, D.C. - The National Institute of Standards and Technology (NIST) issued today its first Guidelines for Smart Grid Cyber Security, which includes high-level security requirements, a framework for assessing risks, an evaluation of privacy issues at personal residences, and additional information for

  11. Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979.

  12. Final Notice of Violation to UChicago Argonne, LLC- WEA-2009-04

    Broader source: Energy.gov [DOE]

    DOE is issuing this Final Notice of Violation (FNOV) to UChicago Argonne, LLC (UChicago Argonne) for violations of DOE's worker safety and health requirements.

  13. EIS-0458: EPA Notice of Availability of Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final EPA/EIS No. 20110087, Topaz Solar Farm Project, Issuing a Loan Guarantee to Royal Bank of Scotland for Construction and Startup, San Luis Obispo County, CA

  14. Advocate- Issue 44- October 2011

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: UCOR Starts on K-25, Annual Planning Meeting, Recovery Act Update, and Results of the PublicvEnvironmental Survey.

  15. Advocate- Issue 61- Jan. 2016

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: DOE Launches K-25 Virtual Museum, Manhattan Project National Park Established, ORSSAB Celebrates 20 Years.

  16. Advocate- Issue 61- Jan. 2016

    Broader source: Energy.gov [DOE]

    Here are some topics in this issue: DOE Launches K-25 Virtual Museum, Manhattan Project National Park Established, ORSSAB Celebrates 20 Years.

  17. Advocate- Issue 52- October 2013

    Broader source: Energy.gov [DOE]

    Here are just some of the stories featured in this issue: Agency Suggestions for FY 2014, Historic Preservation of K-25, and Member Profile - Jimmy Bell

  18. Advocate- Issue 45- January 2012

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: Member Profile: Chuck Jensen, Chairs Videoconference, DOE/NNSA Appeal Y-12 Pollutant Discharge Permit.

  19. Advocate- Issue 48- October 2012

    Broader source: Energy.gov [DOE]

    Here are some of the topics from this issue: K-25 Historic Preservation Agreement, the Board Says Farewell to Maggie Owen, and Groundwater Study Proposed.

  20. Advocate- Issue 42- April 2011

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: Membership Drive, Member Profile: Betty Jones, Chuck Jenkins Recognized, DOE Rethinks U-233 Project, and Membership Changes.

  1. Smart-Grid Security Issues

    SciTech Connect (OSTI)

    Khurana, Himanshu; Hadley, Mark D.; Lu, Ning; Frincke, Deborah A.

    2010-01-29

    TITLE: Smart-Grid Security Issues (Editorial Material, English) IEEE SECURITY & PRIVACY 8 (1). JAN-FEB 2010. p.81-85 IEEE COMPUTER SOC, LOS ALAMITOS

  2. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hillary Johnson, EnviroIssues, noted that the issue managers are recommending that the ... EnviroIssues Alex Teimouri, DOE-HQ Hillary Johnson, EnviroIssues Attachment 1 - RAP ...

  3. EA-2006: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2006: Final Environmental Assessment Columbia Estuary Ecosystem Restoration Program Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, issued a final programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence

  4. EA-2013: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2013: Final Environmental Assessment Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona) Western Area Power Administration (Western) and the Bureau of Land Management (BLM) jointly issued a final EA that analyzes the potential environmental impacts of Western's proposed use of selected herbicides for the treatment of undesirable vegetation within three existing substations on lands administered by BLM.

  5. EA-2022: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2022: Final Environmental Assessment The Bureau of Reclamation, with Western Area Power Administration as a cooperating agency, issued a final EA that assesses the potential environmental impacts of a proposal to develop a 9.4 megawatt hydroelectric project at the existing Helena Valley Pumping Plant site at Canyon Ferry Dam on the Missouri River near Helena, Montana. The new hydropower generator would interconnect to Western's transmission system at an existing

  6. EIS-0393: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0393: Final Environmental Impact Statement Montanore Project; Montana The USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality issued a Final EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE's Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and

  7. EIS-0436: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0436: Final Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington DOE's Bonneville Power Administration (BPA) issued a Final EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near

  8. EIS-0459: Final Programmatic Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 9: Final Programmatic Environmental Impact Statement EIS-0459: Final Programmatic Environmental Impact Statement Hawaii Clean Energy Programmatic Environmental Impact Statement DOE issued a final programmatic EIS that examines the potential environmental impacts of energy efficiency activities and renewable energy technologies that could assist the State of Hawaii in meeting the goal established under the Hawaii Clean Energy Initiative to meet 70% of the State's energy needs by 2030

  9. EIS-0491: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0491: Final Environmental Impact Statement Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana Federal Energy Regulatory Commission, with DOE as a cooperating agency, issued a Final EIS that analyzes the potential environmental impacts of the Lake Charles Liquefaction Project, a proposal to expand an existing liquefied natural gas import terminal in Calcasieu Parish, Louisiana, by constructing and operating natural gas liquefaction and

  10. EIS-0498: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0498: Final Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy Regulatory Commission (FERC) issued a Final EIS that analyzes the potential environmental impacts of constructing and operating the proposed Magnolia LNG Project, an on-land liquefied natural gas (LNG) terminal and associated facilities near Lake Charles, Louisiana. The EIS also analyzes the potential environmental

  11. EIS-0488: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    88: Final Environmental Impact Statement EIS-0488: Final Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) issued a final EIS for a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export LNG. DOE, a cooperating agency, adopted the

  12. EA-2043: Final Environmental Assesment | Department of Energy

    Energy Savers [EERE]

    Final Environmental Assesment EA-2043: Final Environmental Assesment EA-2043: Columbia Stock Ranch Section 536 Ecosystem Restoration Project; Columbia County, Oregon The U.S. Army Corps of Engineers issued a final EA that analyzes the potential environmental impacts of a proposed tidal floodplain ecosystem restoration project at Columbia Stock Ranch, located in Columbia County, Oregon. Bonneville Power Administration, a cooperating agency, proposes to provide funding for the project. For more

  13. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EXISTING CONTRACTS | Department of Energy CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS The Department issued a Final Rule revising the regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). It requires Contracting Officers to attempt to execute

  14. Final Project Report

    SciTech Connect (OSTI)

    Wang, Qiang; Dandy, David S.

    2015-05-15

    This is the final technical report of the DOE project DE-FG02-07ER46448 awarded to Colorado State University.

  15. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Characteristics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" "Structural and ...

  16. National Science Bowl Finals

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  17. DOE Final Report

    SciTech Connect (OSTI)

    Hinzman, Larry D.; Long, James; Newby, Greg B.

    2014-01-08

    This final report contains a summary of work accomplished in the establishment of a Climate Data Center at the International Arctic Research Center, University of Alaska Fairbanks.

  18. Global strategies for environmental issues

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This is the 19th Annual NAEP conference proceedings, containing abstracts of oral presentations and poster sessions. Broad areas covered include the following: Environmental Management; Biodiversity/sustainable development; Gulf Regional Issues; Environmental ethics/equity; NEPA workshop and symposium; International environmental issues; global Environmental Effects; Risk Assessment; and Environmental effects of nuclear waste management.

  19. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: FINAL RULE

    Broader source: Energy.gov [DOE]

    The Department has issued a Final Rule revising the existing contractor regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). One unusual aspect of the Final Rule is that it requires Contracting Officers to attempt to execute bilateral modifications to existing affected contracts to apply the Final Rule's revisions to those contracts. We will issue an Acquisition Letter shortly with suggested contract modification language. (The Final Rule's revisions "… are designed to clarify and streamline existing requirements, improve efficiency of contractor legal management, and facilitate oversight over the expenditure of taxpayer dollars." The contract modifications will state the revisions will only apply to costs incurred from date the bilateral modifications are executed forward. The revisions are administrative in nature. Regarding costs contractors have not yet incurred, the revisions could have been communicated to contractors without using a Final Rule to incorporate them into current contracts. Consequently, the modifications do not require equitable adjustments.)

  20. Issues in workforce composition analysis

    SciTech Connect (OSTI)

    Koeck, D.C.; Rogers, J.D.

    1996-05-01

    An issue of paramount interest to US industry is the supply and quality of human resources available for this country`s scientific and technological activities. The changing composition of the workforce and the responsibility that an organization has to assure equal opportunity, give rise to various issues. This paper discusses some of the issues associated with the scientific and technical workforce. Specifically, it explores some of the questions pertaining to workforce composition and measures of workforce composition. This paper should be useful to those responsible for personnel policies.

  1. Final Meeting Summary ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hillary Johnson, EnviroIssues, suggested using the following terms to define status in the ... Hillary noted that she would add IM initials for each topic and it will later be ...

  2. Advocate- Issue 43- July 2011

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: Retiring Members Honored, Member Profile: David Martin, EM SSAB Chairs Meeting, Board Member’s Company Assists with Japanese Nuclear Plant.

  3. Workers' Spotlight Newsletter- Issue 3

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. January 2013 issue covers National Supplemental Screening Program and What's going on around the Complex.

  4. Workers' Spotlight Newsletter- Issue 4

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. February 2013 issue covers John Hopkins University Former Worker Program.

  5. Advocate- Issue 50- April 2013

    Broader source: Energy.gov [DOE]

    Here are some stories from this issue: Legacy Waste on the Oak Ridge Reservation, K-25's North Tower Demolished, Agency for Toxic Substances and Disease Registry Meets in Oak Ridge, and a Profile on Dave Hemelright.

  6. Automotive Thermoelectric Generator Design Issues

    Office of Energy Efficiency and Renewable Energy (EERE)

    Mechanical, electrical, thermal engineering, and durability issues related to use of TEGs in the challenging automotive environment need to be resolved as they affect warranty cost and customer acceptance.

  7. Advocate- Issue 63- July 2016

    Office of Energy Efficiency and Renewable Energy (EERE)

    Special topics in this issue include DOE's alternatives for increased waste disposal capacity, ORSSAB's recommendation to DOE on the FY 2018 budget request, and progress on the K-27 demolition.

  8. Workers' Spotlight Newsletter- Issue 7

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. May 2013 issue covers WHPP and BTMed Roster Updates and WHPP Video Acknowledgement.

  9. Advocate- Issue 60- October 2015

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: ORSSAB has annual meeting; EM SSAB Chairs meet in Santa Fe; ORSSAB member participates in EPA Community Involvement Conference; ORSSAB members go into the field.

  10. Petroleum 1996: Issues and Trends

    Reports and Publications (EIA)

    1997-01-01

    Examines historical trends and focuses on major petroleum issues and the events they represent. It analyzes different dimensions of the petroleum industry and related markets in terms of how they relate to the volatility in petroleum markets.

  11. Rule Issued to Prohibit Importation of Products that Fail To Comply with Federal Energy Conservation Standards

    Broader source: Energy.gov [DOE]

    After collaborating with the Department of Energy and considering comments from stakeholders, the U.S. Customs and Border Protection (“CBP”) and the U.S. Department of the Treasury issued a final...

  12. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... recognize and respond to a variety of problems and anomalies; to understand complex ... a basis for hazard surveys used for safety analysis, emergency planning, and work planning. ...

  13. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technical Assistance » ISO 50001 Energy Management Standard ISO 50001 Energy Management Standard The ISO 50001 energy management standard is a proven framework for industrial facilities, commercial facilities, or entire organizations to manage energy-including all aspects of energy procurement and use. An energy management system establishes the structure and discipline to implement technical and management strategies that significantly cut energy costs and greenhouse gas emissions-and sustain

  14. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01 October 2004 Remembering the B-Complex Piece by piece it was decommissioned through the summer of 2004. August, when the bulldozers arrived to tear down all that remained of buildings B-1 and B-2. 650 NNSA/NSO contractor employees lay in the parking lot, a heap of rubble and debris. The demolition of buildings B-1 and B-2 in the NNSA/NSO Nevada Support Facility complex surprised no one. The buildings were the subject of a lengthy investigation after it was revealed, in March 2002, that a

  15. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 November 2006 A publication for all members of the NNSA/NSO family ear Admiral Gerald L. Talbot, Jr. has been named as the new manager of the National Nuclear Security Administration's Nevada Site Office. Upon his retirement, after serving 35-years in the United States Navy, Rear Admiral Talbot will assume his new position in January, 2007. He succeeds Kathy A. Carlson, who retired in May 2006. Rear Admiral Talbot currently serves as the Director, Military Personnel Plans and Policy Division.

  16. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 December 06/January 2007 H a p p y H o l i d a y s t o o u r N S O f a m i l y n November, the National Nuclear Security Administration (NNSA) conducted two public meetings in Nevada as part of the preparation of the Supplement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement - Complex 2030. The first meeting on Nov. 28 at Cashman Center in Las Vegas observed an "open-house" format, allowing the public to view information displays, ask questions

  17. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Space Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to ...

  18. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950 ...

  19. CFC Charity Fair Finale

    Broader source: Energy.gov [DOE]

    Finish out the 2012 CFC with the Charity Fair Finale! Buy cookies, participate in a putt-putt golf game, eat some popcorn, and meet and talk with CFC charity representatives.

  20. Final EIS Available

    Broader source: Energy.gov [DOE]

    DOE has published a Final Environmental Impact Statement (EIS) that considers all timely public comments on the Draft EIS and identifies DOE’s preferred project alternative(s). The U.S....

  1. CX-100 Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SAND2008-4648 Unlimited Release Printed July 2008 Blade System Design Studies Phase II: Final Project Report Derek S. Berry TPI Composites, Inc. 373 Market Street Warren, RI 02885...

  2. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ... Units","5 or More Units","Mobile Homes" "Water Heating" "Total Homes",113.6,71.8,6.7,9,19...

  3. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Water ...

  4. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Water Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ... Cold","Mixed- Humid","Mixed-Dry" "Water Heating",,"Cold",,"Hot-Dry","Hot-Humid","M...

  5. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Water Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ... to 119,999","120,000 or More" "Water Heating" "Total Homes",113.6,23.7,27.5,21....

  6. Aurora final report

    SciTech Connect (OSTI)

    Robert, Dross; Amedeo, Conti

    2013-12-06

    Final Technical report detailing the work done by Nuvera and its partners to fulfill the goals of the program "Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks" (a.k.a. AURORA)

  7. Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS - 0097-F c f ` f= �c J m s= Final Environmental Impact Statement BONNEVILLE POWER ADMINISTRATION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of Energy August 1983 Appendices albLbfp= J MMVTJc= Responsible Official: tfiif^j= ^K= s^rde^k= Assistant Secretary for Environmental Protection. Safety, and Emergency Prepafedness Final Environmental Impact Statement BONNEVILLE POWER ADM IN ISTRA TION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of

  8. Blackout Final Implementation Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors

  9. Caspary Thesis Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DENSITY AND BETA LIMITS IN THE MADISON SYMMETRIC TORUS REVERSED-FIELD PINCH by KYLE JONATHAN CASPARY A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (PHYSICS) at the UNIVERSITY OF WISCONSIN-MADISON 2014 Date of final oral examination: March 24th, 2014 The dissertation is under review by the following members of the Final Oral Committee: Brett Chapman, Senior Scientist, Physics John Sarff, Professor, Physics Paul Terry, Professor, Physics

  10. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hillary Johnson, EnviroIssues, suggested bringing the topic of advice responses and timely ... Addington, EnviroIssues Emy Laija, EPA Hillary Johnson, EnviroIssues Mark Freshley, PNNL ...

  11. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... DOE-RL Tom Rogers, WA-DOH Pedro de la Torre III, RPI Annette Cary, Tri-City Herald Jeff Lerch, WCH Hillary Johnson, EnviroIssues Ryan Orth, EnviroIssues Brett Watson, EnviroIssues

  12. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hillary Johnson, EnviroIssues facilitator, agreed to add additional highlights to the ... & Associates, Inc. Alex Teimouri, DOE-RL Hillary Johnson, EnviroIssues Vanessa Turner, ...

  13. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... There were no other nominations. 3-Month Work Plan Hillary Johnson, EnviroIssues, handed ... Hillary will coordinate with Susan Hayman, EnviroIssues, to identify the appropriate ...

  14. Key Issues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Key Issues Key Issues The following presentations offer information about other key topics related to high performance homes. wall_system_innovations_kochkin.pdf (1.48 MB) removing_codes_barriers_cole.pdf (479.86 KB) testing_residential_ariconditioners_booten_winkler.pdf (5.21 MB) code_gaps_combustion_safety.pdf (1.34 MB) automated_utility_bill_calibration_polly.pdf (1.64 MB) predicting_envelope_leakage_griffiths.pdf (1.63 MB) More Documents & Publications Code Gaps and Future Research Needs

  15. Workers' Spotlight Newsletter- Issue 13

    Broader source: Energy.gov [DOE]

    Worker's Spotlight Newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. May/June 2014 issue covers the Director's Note, the Cold War Patriots' Remembrance Quilt, Staff, the National Museum of Nuclear Science and History, Chest X-ray B-reading, and Calendar of Events.

  16. Workers' Spotlight Newsletter- Issue 5

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. March 2013 issue covers Former Worker Medical Screening Program 2012 Annual Report and University of Iowa - Former Worker Program.

  17. Workers' Spotlight Newsletter- Issue 2

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. December 2012 issue covers Updating the Site Exposure Matrices (SEM) and the summary of the 2012 Advanced Ethical Research Conference.

  18. Workers' Spotlight Newsletter- Issue 9

    Broader source: Energy.gov [DOE]

    Workers’ Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. September/October 2013 issue covers Former Worker Medical Screening Program Milestone, United States Preventive Services Task Force (USPSTF) and John Hopkins Former Worker Program in New Mexico.

  19. Workers' Spotlight Newsletter- Issue 12

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. March/April 2014 issue covers Joint Outreach Task Group town hall meeting video, the Bradbury Science Museum, and spirometry.

  20. Workers' Spotlight Newsletter- Issue 8

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Screening Program. July/August issue covers Site Information Sessions, Joint Outreach Task Group Meeting, and National Supplemental Screening Program Low-Dose CT Program.

  1. Workers' Spotlight Newsletter- Issue 14

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. July/August/September issue covers Director's Note, 2014 Sylvia Kieding Award, National Atomic Testing Museum, and Calendar of Events.

  2. Advocate- Issue 56- October 2014

    Broader source: Energy.gov [DOE]

    Here are some of the stories in this issue: ORSSAB held its annual meeting and learned about a number of decisions that will be made in 2015, EM SSAB Chairs meet in Idaho, DOE Responds to recommendations, ORSSAB is recruiting new members, ORSSAB elects officers for FY 2015.

  3. Advocate- Issue 55-July 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Here are some of the stories in this issue: TWPC Continues Processing Transuranic Waste During Suspension of Repository Activities, DOE Develops a Mercury Remediation Strategic Plan for Y-12, EM SSAB Representatives Gather for Semiannual Meeting, Report on Environmental Justice Conference, New Students, ORSSAB Member Honored.

  4. Advocate- Issue 54- April 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Here are some of the stories in this issue: DOE Encourages ORSSAB Input on Second Waste Disposal Facility, ORSSAB/Public Were Involved in Siting EMWMF, Board Member Reports on Waste Management Symposia, and Public Environmental Survey Gathers Input on Cleanup Strategy.

  5. Workers' Spotlight Newsletter- Issue 11

    Office of Energy Efficiency and Renewable Energy (EERE)

    Worker's Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. January/February 2014 issue covers audiogram, the American Museum of Science and Energy, and trivia.

  6. Workers' Spotlight Newsletter- Issue 10

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. November / December 2013 issue covers Remembrance, Beryllium, Secure Electronic Records Transfer (SERT), and Commemorating DOE Former Workers.

  7. Tritium Ground Water Issues | Department of Energy

    Office of Environmental Management (EM)

    Ground Water Issues Tritium Ground Water Issues Presentation from the 35th Tritium Focus Group Meeting held in Princeton, New Jersey on May 05-07, 2015. Tritium Ground Water Issues ...

  8. Final Technical Report

    SciTech Connect (OSTI)

    Gilbert, Chris

    2014-11-13

    The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

  9. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 1 Worker Training......Worker Training Issue Manager framing * Please see Attachment 1 - Transcribed Flip Chart ...

  10. Department of Energy Issues Funding Opportunity Announcement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Media contact(s): (202) 586-4940 Addthis Related Articles Department of Energy Issues ... of Energy Issues Funding Opportunity Announcements to Enhance Nuclear Energy Education

  11. Issues in recycling galvanized scrap

    SciTech Connect (OSTI)

    Koros, P.J.; Hellickson, D.A.; Dudek, F.J.

    1995-02-10

    The quality of the steel used for most galvanizing (and tinplate) applications makes scrap derived from their production and use a premier solid charge material for steelmaking. In 1989 the AISI created a Task Force to define the issues and to recommend technologically and economically sound approaches to assure continued, unhindered recyclability of the growing volume of galvanized scrap. The AISI program addressed the treatment of full-sized industrial bales of scrap. The current, on-going MRI (US)--Argonne National Laboratory program is focused on ``loose`` scrap from industrial and post-consumer sources. Results from these programs, issues of scrap management from source to steel melting, the choices for handling zinc in iron and steelmaking and the benefits/costs for removal of zinc (and lead) from scrap prior to melting in BOF and foundry operations are reviewed in this paper.

  12. fallnl_final.pmd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Coastal Erosion: What is it, How is it Related to Climate Change and Why Should We Care? Bernard Zak, ARM scientst Education Climate Update ARM News for students and teachers about climate change from the Atmospheric Radiation Measurement Program Erosion in the Arctic TWP Education Update Student Activity Critical Thinking ? ARM in the Galapagos Coming and Going Meet the New ARM Educators December 2003 IN THIS ISSUE: R Wave erosion washes foundation away in Barrow, AK. Photo courtesy of Grace

  13. Final Technical Report

    SciTech Connect (OSTI)

    Maxwell, Mike, J., P.E.

    2012-08-30

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  14. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Troxell, W; Batchelor, A

    2012-11-28

    Final report for the formation of faculty and education establishing Colorado State's Smart Grid Integration Center

  15. Issuance of the Final Tank Closure and Waste Management Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement December 5, 2012 - 12:00pm Addthis Media Contacts Carrie Meyer, DOE (509) 376-0810 Carrie_C_Meyer@orp.doe.gov Erika Holmes, Ecology (509) 372-7880 Erika.Holmes@ecy.wa.gov Richland, WA - The U.S. Department of Energy (DOE) is issuing its Final Tank Closure and Waste Management

  16. EIS-0493: Notice of Adoption of Final Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Adoption of Final Environmental Impact Statement EIS-0493: Notice of Adoption of Final Environmental Impact Statement EPA issued a notice of DOE's adoption of a FERC EIS for a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas. DOE, Office of Fossil Energy, was a cooperating agency. Document Download Notice of Adoption of Final EIS (171.36 KB) More Documents & Publications EIS-0447: EPA

  17. issue_no_9.pgm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Winter 1997 Los Alamos National Laboratory o f t h e N u c l e a r M a t e r i a l s T e c h n o l o g y D i v i s i o n Quarterly In This Issue 1 Scientists Study the Use of Fullerenes to Trap Actinides 3 High-Level Policies Impact Stewardship of Excess Plutonium 5 On the Disposal of Plutonium 6 Fabrication of Zircon Leads to a Pu Stabilization Alternative 9 Ph.D. Thesis Explores Sodium Zirconium Phosphate (NZP) Waste Forms for Actinide Disposal 11 Recent Publications, Presentations, and

  18. Hydrogen Delivery Options and Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Options and Issues Mark Paster DOE August, 2006 Scope * From the end point of central or distributed production (300 psi H2) to and including the dispenser at a refueling station or stationary power site - GH2 Pipelines and Trucks, LH2 Trucks, Carriers <$1.00/kg of Hydrogen by 2017 Hydrogen Delivery H2 Delivery Current Status * Technology - GH2 Tube Trailers: ~340 kg, ~2600 psi - LH2 Trucks: ~3900 kg - Pipelines: up to 1500 psi (~630 miles in the U.S.) - Refueling Site Operations

  19. Electric chiller handbook. Final report

    SciTech Connect (OSTI)

    1998-02-01

    Electric chillers have dominated the market for large commercial cooling systems due to their history of reliable, economical operation. The phaseout of CFCs and deregulation of the utility industry are two factors that significantly impact the chiller market. The CFC phaseout is resulting in the upgrading or replacement of thousands of electric chillers nationwide. In a deregulated environment, utilities are finding increasing need to provide services that can win and retain new customers. Utility representatives need current information on applying and selecting cost-effective chiller systems. The objective of this report was to develop a comprehensive handbook that helps utility technical and marketing staff, their customers, and design professionals evaluate and select the best options for chilled-water systems in commercial buildings. Investigators used a variety of industry data sources to develop market-share information for electric and gas chiller systems and to determine applications according to building age, type, and region. Discussions with chiller manufacturers provided information on product availability, performance, and ownership cost. Using EPRI`s COMTECH software, investigators performed comprehensive cost analyses for placement of large and small chillers in three representative cities. Case studies of actual installations support these analyses. Electric Chiller Handbook provides a single source of current information on all major issues associated with chiller selection and application. Key issues include chiller availability and markets, rated performance, future viability of various refrigerant options, the cost-effectiveness of alternative chillers, and chilled-water system optimization. The Handbook also describes available hardware, outlines the features and costs of gas-fired competitive systems, and provides methods and comparisons of life-cycle costing of various chiller system options. Analyses of chiller features and economics show

  20. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The last report was issued December 5, 2013. Hillary Johnson, EnviroIssues, will check ... * What does the TPA say about WESF? Hillary Johnson noted this topic is joint between ...

  1. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hillary Johnson, EnviroIssues, reminded committee members that nominations for committee ... Mike Cline, DOE-RL Dib Goswami, Ecology Hillary Johnson, EnviroIssues Jim Hansen, DOE-RL ...

  2. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hillary Johnson, EnviroIssues, will put Dick's handout on SharePoint. System Plan 7 ... Lynch, DOE-ORP Jane Alzheimer, Ecology Hillary Johnson, EnviroIssues Steve Pfaff, ...

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... DOE-RL Alicia Boyd, Ecology Alex Nazarali, CTUIR Alex Teimouri, DOE-RL Dib Goswami, Ecology Dave Rowland, Yakama Nation Hillary Johnson, EnviroIssues Brett Watson, EnviroIssues

  4. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    2 P r o j e c t D e s i g n a n d I m p l e m e n t a t i o n FINAL REPORT December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsorship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the research and/or

  5. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    3 V e h i c l e M a i n t e n a n c e a n d D u r a b i l i t y FINAL REPORT December 1995 December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsor- ship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the

  6. Final Technical Report

    SciTech Connect (OSTI)

    Sobecky, Patricia A; Taillefert, Martial

    2013-03-29

    This final technical report describes results and findings from a research project to examine the role of microbial phosphohydrolase enzymes in naturally occurring subsurface microorganisms for the purpose of promoting the immobilization of the radionuclide uranium through the production of insoluble uranium phosphate minerals. The research project investigated the microbial mechanisms and the physical and chemical processes promoting uranium biomineralization and sequestration in oxygenated subsurface soils. Uranium biomineralization under aerobic conditions can provide a secondary biobarrier strategy to immobilize radionuclides should the metal precipitates formed by microbial dissimilatory mechanisms remobilize due to a change in redox state.

  7. Microsoft Word - Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles Dr. J. Michael Doster NCSU September 30, 2013 CASL-8-2013-0201-000 Final Report L3.THM.CFD.P7.07 Dr. J. Michael Doster Nuclear Engineering Department North Carolina State University Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles September 30, 2013 CASL-U-2013-0201-000 INTRODUCTION An assessment has been performed of the

  8. Microsoft Word - FINAL_TWCRAP_April2007_summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2007 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD JOINT TANK WASTE/RIVER AND PLATEAU COMMITTEE MEETING April 11, 2007 Richland, WA Topics in this Meeting Summary Welcome and Introductions ................................................................................................ 1 Introduction of Committee Issues and Sitewide Groundwater Integration Activities........ 1 Groundwater Values Flowchart ..........................................................................................

  9. SBA Final Rule affecting the 8(a) Business Development Program

    Broader source: Energy.gov [DOE]

    On February 11, 2011, the Small Business Administration (SBA) issued the attached final rule revising the regulations governing the 8(a) Business Development program, small business size regulations, and Small Disadvantaged Business (SDB) status determinations. The rule incorporates technical changes and substantive changes that mirror existing or new legislation enacted since the last revision in 1998. Some of the substantive changes are as follows:

  10. Final Technical Report

    SciTech Connect (OSTI)

    Marc Snir

    2009-06-22

    The work under this grant consisted of encouraging community activities for the development of parallel programming patterns. This work was in conjunction with the research performed under the Pmodels award - where research was pursued on the development for new parallel programming models. Work on programming patterns does not have, as a goal, the invention of new technology. Rather, it is about codifying existing practice, so as to provide practitioners with a common language. This facilitates education and communication between practitioners. In addition, it helps in the design of new parallel frameworks and languages. One major issue in their design is expressiveness: To what extent does the language or framework facilitates the expression of common programming patterns. In order to assess expressiveness in any useful way, it is necessary to identify those common patterns.

  11. Petroleum 1996 - issues and trends

    SciTech Connect (OSTI)

    1997-09-01

    Increasingly, users of the Energy Information Administration`s petroleum data and analytical reports have expressed an interest in a recurring report that takes a broad view of the petroleum sector. What is sought is some perspective on the complex interrelationships that comprise an industry and markets accounting for 40 percent of the energy consumed in the United States and ranging from the drilling rig in the oil field to the pump at the local gasoline station. This report comprehensively examines historical trends, and selectively focuses on major issues and the events they represent. It analyzes different dimensions of the industry and related markets in terms of how they relate to a common theme, in this case, the volatility in petroleum markets.

  12. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  13. Final Rulemaking, 10 CFR Part 1021, with Amendments Shown In Tracked Changes

    Broader source: Energy.gov [DOE]

    This document presents the final rule as issued September 27, 2011, amendments shown with changes tracked (additions in blue, deletions in red). Categorical exclusions are listed in Appendices A...

  14. 2014-02-03 Issuance: Energy Conservation Standards for External Power Supplies; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule prescribing new energy conservation standards for external power supplies, as issued by the Assistant Secretary on February 3, 2014.

  15. 60-Day waste compatibility safety issues and final results for AY-102 grab samples

    SciTech Connect (OSTI)

    Nuzum, J.L.

    1997-01-31

    Four grab samples (2AY-96-15, 2AY-96-16, 2AY-96-17, and 2AY-96-18) were taken from Riser 15D of Tank 241-AY-102 on October 8, 1996, and received by 222-S Laboratory on October 8, 1996. These samples were analyzed in accordance with Compatibility Grab Sampling and Analysis Plan (TSAP) and Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO) in support of the Waste Compatibility Program. No notifications were required based on sample results.

  16. Microsoft Word - CHAPTER 11 FINAL ISSUE 3-06-07--revised 03 18...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... funds over a specified time period and rate of interest. ... Tort claims are claims against the United States for injury to or loss of property or personal injury or death ...

  17. The National Ignition Facility (NIF) and the issue of nonproliferation. Final study

    SciTech Connect (OSTI)

    1995-12-19

    NIF, the next step proposed by DOE in a progression of Inertial Confinement Fusion (ICF) facilities, is expected to reach the goal of ICF capsule ignition in the laboratory. This report is in response to a request of a Congressman that DOE resolve the question of whether NIF will aid or hinder U.S. nonproliferation efforts. Both technical and policy aspects are addressed, and public participation was part of the decision process. Since the technical proliferation concerns at NIF are manageable and can be made acceptable, and NIF can contribute positively to U.S. arms control and nonproliferation policy goals, it is concluded that NIF supports the nuclear nonproliferation objectives of the United States.

  18. Final Notice of Violation issued to Los Alamos National Security, LLC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 28, 2015 VIA OVERNIGHT CARRIER Dr. Charles F. McMillan, President Los Alamos National Security, LLC Los Alamos National Laboratory Mailstop A 100, Drop Point 31 S Bikini Atoll Road, TA-3 Los Alamos, New Mexico 87545-1663 SEA-2015-02 (FNOV) Dear Dr. McMillan: Pursuant to section 234B of the Atomic Energy Act of 1954, as amended (the Act), 42 U.S.C. § 2282b, and the Department of Energy (DOE) regulations at //IA. **~~If~ llV~~~*41\ National Nuclear Security Administration 10 C.F.R. Part 824,

  19. DOE Issues Final Request for Proposal for the Operation of Depleted...

    Broader source: Energy.gov (indexed) [DOE]

    Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities at Paducah, Kentucky and Portsmouth, Ohio. A cost-plus award fee and firm-fixed-price contract line item ...

  20. Microsoft Word - EM ARRA Newsletter Issue4 July 2009_FINAL.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U U U . . . S S S . . . D D D e e e p p p a a a r r r t t t m m m e e e n n n t t t o o o f f f E E E n n n e e e r r r g g g y y y ● ● ● O O O f f f f f f i i i c c c e e e o o o f f f E E E n n n v v v i i i r r r o o o n n n m m m e e e n n n t t t a a a l l l M M M a a a n n n a a a g g g e e e m m m e e e n n n t t t A A A M M M E E E R R R I I I C C C A A A N N N R R R E E E C C C O O O V V V E E E R R R Y Y Y & & & R R R E E E I I I N N N V V V E E E S S S T T T M M M E

  1. DOE Issues Final Environmental Impact Statement for the FutureGen...

    Energy Savers [EERE]

    2.0 Project, including the direct and indirect environmental impacts from construction ... The funding would be used for project design and development, procurement of capital ...

  2. Department of Energy Issues Final $12.5 Billion Advanced Nuclear...

    Energy Savers [EERE]

    ... power plant to begin construction in the U.S. in the last three decades, one of the world's largest wind farms, several of the world's largest solar generation and thermal ...

  3. NTSF Spring 2010 Final Agenda

    Broader source: Energy.gov [DOE]

    Final Agenda for the U.S. Department of Energy's National Transportation Stakeholder Forum taking place in Chicago, Illinois.

  4. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

  5. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilitiesInternational Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden)Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis VlachoudisWorkshop Assistant: Graldine Jean

  6. Final Progress Report

    SciTech Connect (OSTI)

    Josef Michl

    2011-10-31

    In this project we have established guidelines for the design on organic chromophores suitable for producing high triplet yields via singlet fission. We have proven their utility by identifying a chromophore of a structural class that had never been examined for singlet fission before, 1,3-diphenylisobenzofuran, and demonstrating in two independent ways that a thin layer of this material produces a triplet yield of 200% within experimental error. We have also designed a second chromophore of a very different type, again of a structural class that had not been examined for singlet fission before, and found that in a thin layer it produces a 70% triplet yield. Finally, we have enhanced the theoretical understanding of the quantum mechanical nature of the singlet fission process.

  7. FINAL/ SCIENTIFIC TECHNICAL REPORT

    SciTech Connect (OSTI)

    McDonald, Henry; Singh, Suminderpal

    2006-08-28

    The overall objective of the Chattanooga fuel cell demonstrations project was to develop and demonstrate a prototype 5-kW grid-parallel, solid oxide fuel cell (SOFC) system that co-produces hydrogen, based on Ion Americas technology. The commercial viability of the 5kW SOFC system was tested by transporting, installing and commissioning the SOFC system at the Alternative Energy Laboratory at the University of Tennessee Chattanooga. The system also demonstrated the efficiency and the reliability of the system running on natural gas. This project successfully contributed to the achievement of DOE technology validation milestones from the Technology Validation section of the Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan. Results of the project can be found in the final technical report.

  8. ESPC ENABLE Final Proposal Requirements

    Broader source: Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  9. FEMP Federal Fleet Files - May 2009 Issue

    SciTech Connect (OSTI)

    2009-06-04

    May 2009 issue of the monthly FEMP newsletter highlighting the latest news and developments impacting Federal fleets.

  10. Technical issues in licensing low-level radioactive waste facilities

    SciTech Connect (OSTI)

    Junkert, R.

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  11. Title XVII Final Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Rule Title XVII Final Rule Title XVII Final Rule (107.56 KB) More Documents & Publications Final Rule (December 4, 2009) Notice of Proposed Rulemaking (August 6, 2009) Final Rule (October 23, 2007)

  12. Final Technical Report

    SciTech Connect (OSTI)

    Aristos Aristidou Natureworks); Robert Kean; Tom Schechinger; Stuart Birrell; Jill Euken

    2007-10-01

    The two main objectives of this project were: 1) to develop and test technologies to harvest, transport, store, and separate corn stover to supply a clean raw material to the bioproducts industry, and 2) engineer fermentation systems to meet performance targets for lactic acid and ethanol manufacturers. Significant progress was made in testing methods to harvest corn stover in a “single pass” harvest mode (collect corn grain and stover at the same time). This is technically feasible on small scale, but additional equipment refinements will be needed to facilitate cost effective harvest on a larger scale. Transportation models were developed, which indicate that at a corn stover yield of 2.8 tons/acre and purchase price of $35/ton stover, it would be unprofitable to transport stover more than about 25 miles; thus suggesting the development of many regional collection centers. Therefore, collection centers should be located within about 30 miles of the farm, to keep transportation costs to an acceptable level. These collection centers could then potentially do some preprocessing (to fractionate or increase bulk density) and/or ship the biomass by rail or barge to the final customers. Wet storage of stover via ensilage was tested, but no clear economic advantages were evident. Wet storage eliminates fire risk, but increases the complexity of component separation and may result in a small loss of carbohydrate content (fermentation potential). A study of possible supplier-producer relationships, concluded that a “quasi-vertical” integration model would be best suited for new bioproducts industries based on stover. In this model, the relationship would involve a multiyear supply contract (processor with purchase guarantees, producer group with supply guarantees). Price will likely be fixed or calculated based on some formula (possibly a cost plus). Initial quality requirements will be specified (but subject to refinement).Producers would invest in harvest

  13. Final Technical Report

    SciTech Connect (OSTI)

    Bohdan W. Oppenheim

    2007-02-27

    In the fiscal years 2003 through 2006, the LMU-IAC conducted 76 industrial assessments with 595 assessment recommendations, with 382 recommendations implemented, with practically all plant types and sizes, extending in geographical location from about 250 miles north of LMU-IAC to 50 miles south and 90 miles east. Plant sizes varied from one building of 30,000 sq ft to 17 buildings of 1.5 million sq ft. The amount of energy savings identified was worth about $34,303,699. Because of the national level Lean Productivity programs at the university, LMU-IAC is unique in its expertise of the impact of Lean productivity on energy savings, which is huge, far exceeding the energy savings from the equipment improvements. Besides energy savings, LMU-IAC promoted the good name of the program and DOE in the local industry, utilities, trade organizations, the vast aerospace industry, educational institutions, and the public. The IAC work resulted in numerous public lectures, a chapter in the Encyclopedia of Industrial Energy, and several journal articles. 37 students, including 8 graduate students have been trained and issued DOE IAC Certificates. Several of them found work as energy experts.

  14. Hot Leg Piping Materials Issues

    SciTech Connect (OSTI)

    V. Munne

    2006-07-19

    With Naval Reactors (NR) approval of the Naval Reactors Prime Contractor Team (NRPCT) recommendation to develop a gas cooled reactor directly coupled to a Brayton power conversion system as the space nuclear power plant (SNPP) for Project Prometheus (References a and b) the reactor outlet piping was recognized to require a design that utilizes internal insulation (Reference c). The initial pipe design suggested ceramic fiber blanket as the insulation material based on requirements associated with service temperature capability within the expected range, very low thermal conductivity, and low density. Nevertheless, it was not considered to be well suited for internal insulation use because its very high surface area and proclivity for holding adsorbed gases, especially water, would make outgassing a source of contaminant gases in the He-Xe working fluid. Additionally, ceramic fiber blanket insulating materials become very friable after relatively short service periods at working temperatures and small pieces of fiber could be dislodged and contaminate the system. Consequently, alternative insulation materials were sought that would have comparable thermal properties and density but superior structural integrity and greatly reduced outgassing. This letter provides technical information regarding insulation and materials issues for the Hot Leg Piping preconceptual design developed for the Project Prometheus space nuclear power plant (SNPP).

  15. TRIBAL ISSUES TOPIC GROUP MEETING SUMMARY JULY 13, 1999 Crowne

    Office of Environmental Management (EM)

    JULY 13, 1999 Crowne Plaza Center City Hotel, Philadelphia, PA Kevin Blackwell (U.S. Department of Transportation/Federal Rail Administration) (DOT/FRA) presented an overview of the topic group's discussion. The status of the DOT/FRA's response to DOE's inquiry about the tribal right to inspect rail shipments is still an open issue. At the time of the July meeting, the response was in the final stages of review in the Secretary of Transportation's Legal Division. The response will be forwarded

  16. INJECTION CARBON STRIPPING FOIL ISSUES IN THE SNS ACCUMULATOR RING.

    SciTech Connect (OSTI)

    BEEBE-WANG,J.; LEE,Y.Y.; RAPARIA,D.; WEI,J.

    2001-06-18

    We are reporting the results of studies on issues related to the injection stripping foil in the Spallation Neutron Source (SNS) accumulator ring. The problems related to foil heating and foil lifetime, such as current density distribution and temperature distribution in the foil, are investigated. The impact of injection errors on the beam losses at the foil is studied. The particle traversal rate and the beam losses due to scattering in the foil are summarized. Finally, SNS end-to-end simulation results of the foil-missing rate, the foil-hitting rate and the maximum foil temperature are presented.

  17. DOE Issues Guidance for "Other Transactions" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for "Other Transactions" DOE Issues Guidance for "Other Transactions" November 15, 2005 - 12:42pm Addthis Provides Opportunity for Increased Industry Research Partnerships WASHINGTON, DC - On November 7, 2005, the Department of Energy (DOE) issued an interim final rule for the establishment of policies and procedures for a new "other transaction" authority. This authority allows DOE to remove barriers to commercial firms' participation in some of DOE's

  18. DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Landmark Rule for Risk Insurance for Advanced Nuclear Facilities DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities May 8, 2006 - 10:36am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) issued on Saturday, the interim final rule required by the Energy Policy Act of 2005 (EPACT) for risk insurance to facilitate construction of new advanced nuclear power facilities. The rule establishes the requirements for risk insurance to cover

  19. Tiger LDRD final report

    SciTech Connect (OSTI)

    Steich, D J; Brugger, S T; Kallman, J S; White, D A

    2000-02-01

    This final report describes our efforts on the Three-Dimensional Massively Parallel CEM Technologies LDRD project (97-ERD-009). Significant need exists for more advanced time domain computational electromagnetics modeling. Bookkeeping details and modifying inflexible software constitute a vast majority of the effort required to address such needs. The required effort escalates rapidly as problem complexity increases. For example, hybrid meshes requiring hybrid numerics on massively parallel platforms (MPPs). This project attempts to alleviate the above limitations by investigating flexible abstractions for these numerical algorithms on MPPs using object-oriented methods, providing a programming environment insulating physics from bookkeeping. The three major design iterations during the project, known as TIGER-I to TIGER-III, are discussed. Each version of TIGER is briefly discussed along with lessons learned during the development and implementation. An Application Programming Interface (API) of the object-oriented interface for Tiger-III is included in three appendices. The three appendices contain the Utilities, Entity-Attribute, and Mesh libraries developed during the project. The API libraries represent a snapshot of our latest attempt at insulated the physics from the bookkeeping.

  20. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Fridman

    2005-06-01

    This DOE project DE-FC36-04GO14052 ''Plasma Pilot Plant Test for Treating VOC Emissions from Wood Products Plants'' was conducted by Drexel University in cooperation with Georgia-Pacific (G-P) and Kurchatov Institute (KI). The objective of this project was to test the Plasma Pilot Plant capabilities in wood industry. The final goal of the project was to replace the current state-of-the-art, regenerative thermal oxidation (RTO) technology by Low-Temperature Plasma Technology (LTPT) in paper and wood industry for Volatile Organic Components (VOC) destruction in High Volume Low Concentration (HVLC) vent emissions. MetPro Corporation joined the team as an industrial partner from the environmental control business and a potential leader for commercialization. Concurrent Technology Corporation (CTC) has a separate contract with DOE for this technology evaluation. They prepared questionnaires for comparison of this technology and RTO, and made this comparison. These data are presented in this report along with the description of the technology itself. Experiments with the pilot plant were performed with average plasma power up to 3.6 kW. Different design of the laboratory and pilot plant pulsed coronas, as well as different analytical methods revealed many new peculiarities of the VOC abatement process. The work reported herein describes the experimental results for the VOCs removal efficiency with respect to energy consumption, residence time, water effect and initial concentration.

  1. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Pigarov

    2012-06-05

    This is the final report for the Research Grant DE-FG02-08ER54989 'Edge Plasma Simulations in NSTX and CTF: Synergy of Lithium Coating, Non-Diffusive Anomalous Transport and Drifts'. The UCSD group including: A.Yu. Pigarov (PI), S.I. Krasheninnikov and R.D. Smirnov, was working on modeling of the impact of lithium coatings on edge plasma parameters in NSTX with the multi-species multi-fluid code UEDGE. The work was conducted in the following main areas: (i) improvements of UEDGE model for plasma-lithium interactions, (ii) understanding the physics of low-recycling divertor regime in NSTX caused by lithium pumping, (iii) study of synergistic effects with lithium coatings and non-diffusive ballooning-like cross-field transport, (iv) simulation of experimental multi-diagnostic data on edge plasma with lithium pumping in NSTX via self-consistent modeling of D-Li-C plasma with UEDGE, and (v) working-gas balance analysis. The accomplishments in these areas are given in the corresponding subsections in Section 2. Publications and presentations made under the Grant are listed in Section 3.

  2. Final Technical Report

    SciTech Connect (OSTI)

    Velasco, Mayda

    2013-11-01

    This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.

  3. Issues evaluation process at Rocky Flats Plant

    SciTech Connect (OSTI)

    Smith, L.C.

    1992-04-16

    This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

  4. A special issue on the RCPs

    SciTech Connect (OSTI)

    Van Vuuren, Detlef; Edmonds, James A.; Kainuma, M.; Riahi, Keywan; Weyant, John

    2011-11-01

    important reference point for new research within the integrated assessment modeling (IAM) community by standardizing on a common set of year-2100 conditions, and exploring alternative pathways and policies that could produce these outcomes. By design, the RCPs, as a set, cover the range of radiative forcing levels examined in the open literature and contain relevant information for climate model runs. This Special Issue documents the main assumptions and characteristics of the RCPs, and, in particular, the various steps that were involved in their development. A number of collaborative activities were initiated and finalized during the last 2-3 years to develop the RCPs. This required the cooperation of researchers from various disciplines involved in climate research, including emission experts, climate modelers, atmospheric chemistry modelers, land use modelers and experts involved in integrated assessment. The four RCPs together reflect the range of year-2100 radiative forcing values found in the literature, i.e. from 2.6 to 8.5 W/m{sup 2}. The papers in this Special Issue describe the individual RCPs, but also the various integrative steps that were necessary within the RCP development process to provide a harmonized set of pathways, that show a smooth transition from the past and extend far into the future for very long-term experiments. Important outcomes of this process included, for instance, the development of new emission inventories, new methods for the harmonization of spatial land use patterns, as well as extensions of the RCP trends beyond 2100. They briefly discuss the content of the individual papers.

  5. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 2 DOE-RL Maintenance Policy ......DOE-RL Maintenance Policy * Issue Manager introduction Keith Smith, IM for the DOE-RL ...

  6. strategy20080521 FINAL.cdr

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... It emphasizes community participation, stakeholder involvement, and community empowerment. It refocuses research to reflect the recognition of various health issues in minority, ...

  7. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    treatment, and closure The committee agreed that they would clarify the January meeting agenda, further discuss committee business, and continue issue manager discussions during...

  8. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    appropriate timeframes for when to discuss topics. The committee will update their Fiscal Year 2012 Issues Table (Attachment 4) through email. The HAB Values White Paper...

  9. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Committee Business (Part One) HAB Values White Paper Hillary Johnson, EnviroIssues, ... Hillary will incorporate the committee's edits. The Board Values White Paper will be ...

  10. EDITORIAL HPJ SPECIAL ISSUE INTRODUCTION

    SciTech Connect (OSTI)

    Farfan, E.

    2011-10-01

    international scientific community to support ICC and join its activities (Chernobyl Center 2006). In December 1995, a memorandum of understanding (MOU) on the ChNPP closure was signed by the government of Ukraine, all of the G7 governments, and the European Commission. The ICC foundation was considered critical to ensure the safe decommissioning of the ChNPP reactor units and improvement of the safety of the Chernobyl Containment Shelter. On the 10th anniversary of the Chernobyl accident (26 April 1996), Mr. Viktor Yushchenko, the President of Ukraine, issued a decree to establish the Chernobyl Center for Nuclear Safety, Radioactive Waste and Radioecology (Chernobyl Center). On the same day, a MOU involving the US participation in Chernobyl Center activities was signed by the US and Ukraine (Chernobyl Center 2006). In July 1998, the US and Ukraine signed an agreement to establish the International Radioecology Laboratory (IRL) as part of the Chernobyl Center. The creation of IRL was a logical continuation of previous programs to conduct scientific research in radioecology and provide Ukraine and the rest of the world with the necessary infrastructure and scientific basis to conduct research in radioecology, radiobiology, dosimetry, and environmental protection in the ChEZ (Chernobyl Center 2006). A recent collaborative effort with IRL has been implemented through a project titled 'Long-term impacts from radiation/contamination within the Chernobyl Exclusion Zone' (Farfan et al. 2008; Gerdes et al. 2009; Marra et al. 2010). This collaboration had the following objectives: (1) Assess the long-term impacts to the environment from radiation exposure within the ChEZ; (2) Provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories based on the results of long-term field monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination; and (3) Recommend the development and

  11. Final technical report

    SciTech Connect (OSTI)

    Johnson, C.; Long, S.; Li, Binsheng; Lamke, A.J.

    1994-07-01

    The overall goal of the contract is to provide general support and advice to the DOE, Office of Fossil Energy (DOE/EF) on the opportunities for coal and Clean Coal Technology trade in the Asia-Pacific region. The report which follows is divided into six subsections, each pertaining to separate subtasks the U.S. Department of Energy requested. Subtask A includes two reports, one which outlines important coal and clean coal technology news events which occurred during the second half of 1993, and another which outlines the potential for Clean Coal Technology in the Asia-Pacific Region. Subtask B and the first paper in Subtask C contain advisories and briefing papers that present and explain the coal, electricity and Clean Coal Technology situation in China. The second paper in Subtask C is an overview of the coal supply, demand and trade situation in the Asian region with coal projections to the year 2010. Subtask D is an overview of meetings with Asian energy and policy representatives which were carried out to (1) gather key information relevant to this contract, and (2) examine areas for closer cooperation on important coal/CCT-related energy issues. The tasks listed in the contract proposal as Subtasks E and F are summarized in respective sections of this report. Subtask E specifies the activities carried out under the APEC Experts` Group on Clean Coal Technologies, and Subtask F explains the work done by the Coal Project in building contacts and working relationships with key energy and technology planners in China (including The State Science and Technology Commission, the Ministry of Electric Power and Tsinghua University, and the State Planning Commission). The Subtask E section also includes activities to develop and strengthen the role of the APEC Experts Group on Clean Coal Activities.

  12. Northwest Ohio Final Report

    SciTech Connect (OSTI)

    Moyer, Kevin

    2015-03-04

    and quickly to building owners when they are prepared to commit to the project as well as act as a trusted facilitator and advisor to both building owners and other stakeholders. Taking a flexible and pragmatic approach to project evaluation and implementation that matches time and expense to the complexity of the project has been another key learning. To date the program has closed 3 energy bond issues through the TLCPA sponsored and managed NW Ohio Bond Fund totaling $16.54 million (of which $3.34 million were QECB qualified). The program has turned over its $3.0 million revolving loan fund twice as construction financing in advance of bond issuance and currently has issued $1.25 million in revolving term loans. The program has $1.66 million of remaining capacity for QECB qualified bonds. The program can issue an additional $13.46 million in energy bonds continuing to utilize its DOE EECBG loan loss reserves. In addition, the program has available $3.6 million of loan loss reserves from the State of Ohio, as an eligible Port Authority, that can back the issuance of an additional $7.2 to $14.4 million of energy bonds. This does not include additional bond capacity is available from the NW Ohio Bond Fund. The program is the master escrow agent for $18 million of loan loss reserves from the State of Ohio for eligible Port Authorities that can be utilized to assist the formation of energy districts and financing programs in major metropolitan areas and regions around the State of Ohio. Other leveraged funds now total $10 million; placing the total project value completed and financed at over $30 million. In addition that program has generated an active pipeline of projects in various stages that total $25 – $30 million.

  13. MTX final report

    SciTech Connect (OSTI)

    Hooper, E.B.; Allen, S.L.; Brown, M.D.; Byers, J.A.; Casper, T.A.; Cohen, B.I.; Cohen, R.H.; Fenstermacher, M.E.; Foote, J.H.; Hoshino, K.

    1994-01-01

    The MTX experiment was proposed in 1986 to apply high frequency microwaves generated by a free-electron laser (FEL) to electron cyclotron resonance heating (ECRH) in a high field, high density tokamak. As the absorption of microwaves at the electron cyclotron resonance requires high frequencies, the opportunity of applying a free-electron laser has appeal as the device is not limited to frequencies in the microwave or long millimeter wavelength regions, in contrast to many other sources. In addition, the FEL is inherently a high power source of microwaves, which would permit single units of 10 MW or more, optimum for reactors. Finally, it was recognized early in the study of the application of the FEL based on the induction linear accelerator, that the nonlinear effects associated with the intense pulses of microwaves naturally generated would offer several unique opportunities to apply ECRH to current drive, MHD control, and other plasma effects. It was consequently decided to adapt the induction accelerator based FEL to heating and controlling the tokamak, and to conduct experiments on the associated physics. To this end, the Alcator C tokamak was moved from the Massachusetts Institute of Technology (MIT) to the Lawrence Livermore National Laboratory where it was installed in Building 431 and operated from March, 1989, until the conclusion of the experiment in October, 1992. The FEL, based on the ETA-11 accelerator and IMP wiggler was brought into operation by the LLNL Electron Beam Group and power injected into the tokamak during an experimental run in the Fall, 1989. Following an upgrade by the MTX group, a second experimental run was made lasting from the Winter, 1992 through the end of the experiment. Significant contributions to the ECRH experiments were made by the Japan Atomic Energy Research Institute (JAERI).

  14. PARC Periodical | Vol. 6, Issue 2 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vol. 6, Issue 2 December 1, 2014 PARC Periodical | Vol. 6, Issue 2 View Periodical Here

  15. PARC Periodical | Vol. 6, Issue 3 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vol. 6, Issue 3 February 9, 2015 PARC Periodical | Vol. 6, Issue 3 View Periodical Here

  16. PARC Periodical | Volume 6, Issue 6 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 6, Issue 6 August 20, 2015 PARC Periodical | Volume 6, Issue 6

  17. PARC Periodical | Volume 7, Issue 1 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 7, Issue 1 October 12, 2015 PARC Periodical | Volume 7, Issue 1

  18. Final Report Package_Winnebago

    SciTech Connect (OSTI)

    Carolyn Stewart, Director, Red Mountain Energy Partners

    2006-10-31

    The Winnebago Tribe of Nebraska energy options study results will be used to advance the Tribes near term energy management objectives. The array of energy options identified allows the Tribe to select those activities that best fit its energy strategies, goals and objectives. During the course of the study, Red Mountain analyzed both energy options and energy organizational alternatives suitable for the Tribe, presented findings to the Tribal Council, and made recommendations regarding each. Work products delivered to the Tribe, and provided in the Final Report included: A matrix of energy management options applicable to the Tribe, which provided descriptions of particular conservation, efficiency, weatherization, and demand management alternatives. The matrix also provided insight about relative costs of the alternatives, cost/benefit efficacy, ease of implementation, resources for implementing, and observations about each. A matrix of utility service options applicable to the Tribe, describing each of the four alternatives described above. The matrix also provided insight about key benefits of each option, required resources, costs and timeframe for implementation, funding sources and analysis, and key issues for consideration. Discussion guides prepared for each meeting between the Energy Committee and Council, and the Tribes contractor, Red Mountain Energy Partners, which included preliminary analysis and findings. A Position Description for the Energy Manager position, which was reviewed by the Tribal HR Department, and used by the Tribe to develop a position posting. A Utility Code designed for Winnebago to use in establishing its Utility Board, and, ultimately, to provide guidance for the Boards further development. A project summary book developed to include all key information, deliverables and utility provider data for the project. Winnebagos growth trends and expansion plans require the Tribe to play a more active role in assuring that

  19. U.S. Department of Energy Issues Rules for Auto Loan Program | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Issues Rules for Auto Loan Program U.S. Department of Energy Issues Rules for Auto Loan Program November 5, 2008 - 4:47pm Addthis WASHINGTON, DC - Today the U.S. Department of Energy issued an Interim Final Rule that implements the Advanced Technology Vehicles Manufacturing Incentive Program authorized by section 136 of the Energy Independence and Security Act of 2007 (EISA). The FY09 Continuing Resolution provided DOE with funding to make up to $25 billion in direct loans to

  20. Final Scientific Report

    SciTech Connect (OSTI)

    Suzanne Lutwick; Helen Cunning

    2011-05-25

    Hackensack University Medical Center's major initiative to create a cleaner healthier and safer environment for patients, employees and the community served by the medical center is built on its commitment to protect the environment and conserve precious energy resources. Since 2004 the Medical Center launched a long term campaign to temper the negative environmental impact of proposed and existing new construction at the medical center and to improve campus wide overall energy efficiency. The plan was to begin by implementing a number of innovative and eco-friendly enhancements to the Gabrellian Women's and Children's Pavilion, in construction at the time, which would lead to Certification by the US Green Building Councils Leadership & Environmental Design (LEED) program. In addition the medical center would evaluate the feasibility of implementing a photovoltaic system in the new construction (in development and planned) to provide clean pollution free electricity. The steps taken to achieve this included conducting a feasibility study complete with architectural and engineering assessments to determine the potential for implementation of a photovoltaic system on the campus and also to conduct an energy survey that would focus on determining specific opportunities and upgrades that would lead to a healthier energy efficient interior environment at the medical center. The studies conducted by the medical center to determine the viability of installing a photovoltaic system identified two key issues that factored into leaderships decision not to implement the solar powered system. These factors were related to the advanced phase of construction of the women's and children's pavilion and the financial considerations to redesign and implement in the ambulatory cancer center. The medical center, in spite of their inability to proceed with the solar aspect of the project upheld their commitment to create a healthier environment for the patients and the community. To

  1. Final Technical Report

    SciTech Connect (OSTI)

    Helen Cunning

    2012-05-08

    Hackensack University Medical Center's major initiative to create a cleaner healthier and safer environment for patients, employees and the community served by the medical center is built on its commitment to protect the environment and conserve precious energy resources. Since 2004 the Medical Center launched a long term campaign to temper the negative environmental impact of proposed and existing new construction at the medical center and to improve campus wide overall energy efficiency. The plan was to begin by implementing a number of innovative and eco-friendly enhancements to the Gabrellian Women's and Children's Pavilion, in construction at the time, which would lead to Certification by the US Green Building Councils Leadership & Environmental Design (LEED) program. In addition the medical center would evaluate the feasibility of implementing a photovoltaic system in the new construction (in development and planned) to provide clean pollution free electricity. The steps taken to achieve this included conducting a feasibility study complete with architectural and engineering assessments to determine the potential for implementation of a photovoltaic system on the campus and also to conduct an energy survey that would focus on determining specific opportunities and upgrades that would lead to a healthier energy efficient interior environment at the medical center. The studies conducted by the medical center to determine the viability of installing a photovoltaic system identified two key issues that factored into leaderships decision not to implement the solar powered system. These factors were related to the advanced phase of construction of the women's and children's pavilion and the financial considerations to redesign and implement in the ambulatory cancer center. The medical center, in spite of their inability to proceed with the solar aspect of the project upheld their commitment to create a healthier environment for the patients and the community. To

  2. DOE Announces Final Rule for Loan Guarantee Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Rule for Loan Guarantee Program DOE Announces Final Rule for Loan Guarantee Program October 4, 2007 - 3:14pm Addthis Invites 16 Pre-Applicants to Submit Applications for Federal Support of Innovative Clean Energy Projects WASHINGTON, DC - Secretary of Energy Samuel W. Bodman today announced that the Department of Energy (DOE) has issued the final regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (EPAct). DOE's action today will pave the

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... administrative controls, worker training, industrial hygiene procedures, occupational medicine programs and oversight 2009-present" Final Meeting Summary Page 4 Health, Safety ...

  4. LIVE_NSB_final.wmv

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  5. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    upcoming action and follow-up items. * Attachment 5: Tri-Party Agreement Agency Fiscal Year 2015 Work Plan- RAP-focused Topics1: Transcribed flipcharts Final Meeting...

  6. EA-1637: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    10 CFR 431 Energy Conservation Program for Commerical and Industrial Equipment: Packaged Terminal Air Conditioner and Packaged Terminal Heat Pump Energy Conservation Standards; Final Rule

  7. Final Land Configuration for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B.; Davis, R. W.

    2006-07-01

    Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

  8. EA-1726: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1726: Final Environmental Assessment Loan Guarantee to Kahuku Wind Power, LLC for Construction of the Kahuku Wind Power Facility in Kahuku, O'ahu, Hawai'i DOE's proposed action is to issue a $117 million loan guarantee to Kahuku Wind Power LLC to support construction of the Kahuku Wind Power facility. The proposed facility would consist of 12 Clipper LibertyTM 2.5-MW WTGs, an operations and maintenance (O&M) building, one permanent unguyed meteorological

  9. Inquiry 2012, Issue 1 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Issue 1 Image Welcome to Inquiry 2012, Issue 1 Materials and Manufacturing This issue of Inquiry focuses on the vital link between materials and manufacturing. The Ames Laboratory is among the research centers that are the most consistently successful in the world at bringing advanced basic science together with manufacturing applications in the realm of materials. This kind of success in technology transfer requires many skills and capabilities, but the first of these is world-leading

  10. Inquiry 2014, Issue 1 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, Issue 1 Welcome to Inquiry 2014, Issue 1 Behind the Science at The Ames Laboratory Image For every discovery, big or small, there are countless hours spent in the lab developing experiments, analyzing data and then trying to replicate the results. It takes experimentalists, characterization experts, and theorists all working together. Research at the Ames Laboratory exemplifies just this type of teamwork, as you'll see in the stories presented in this issue. While projects must have

  11. Key Issues in Tribal Energy Development

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Key Issues in Tribal Energy Development Common Issues, Causes and Solutions Douglas C. MacCourt, Ater Wynne LLP Chair Chair, Executive Committee Indian Law Practice Group Indian Law Section Ater Wynne LLP Oregon State Bar Association dcm@aterwynne.com www.aterwynne.com US DOE Tribal Energy Program/NREL Denver, Colorado October 25-28, 2010 Overview of Presentation * Overview of Handbook * A note on Alaska * Common development issues and solutions 1. Finding Early Stage Risk Capital * Necessary

  12. Relicensing and Environmental Issues Affecting Hydropower

    Reports and Publications (EIA)

    1998-01-01

    This article presents an overview of the hydropower industry and summarizes two recent events that have greatly influenced relicensing and environmental issues.

  13. Department of Energy Issues Funding Opportunity Announcements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    website. Media contact(s): (202) 586-4940 Addthis Related Articles Department of Energy Issues Funding Opportunity Announcements to Enhance Nuclear Energy Education Department ...

  14. UESC Contracting Officer Issues Round-Up

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses issues contracting officers often face with utility energy service contracts (UESCs).

  15. Inquiry 2010, Issue 2 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, Issue 2 Welcome to Inquiry 2010, Issue 2 "The Rare Earth Issue" This issue of Inquiry highlights rare-earth elements which play a vital role in just about every new technology from consumer electronics and cell phones to hybrid car batteries and generator motors in wind turbines. We discuss the Ames Laboratory's role as an international leader in rare-earth research and look at the current crisis caused by China's monopoly as the source of rare-earth oxides, on-going research

  16. Inquiry 2012, Issue 2 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Issue 2 Welcome to Inquiry 2012, Issue 2 Faces of the Ames Laboratory Image This issue of Inquiry focuses on some of the many faces that make up the Ames Laboratory. In fact, it is the people -- the researchers, support staff and students -- who make the Laboratory what it is. In this issue, we introduce nine of our researchers. You get to learn about their research but also find out a little about them personally. What motivates them, how they view their work and the Ames Laboratory. We also

  17. Reactor Materials Newsletter, Issue 2, May 2016

    Broader source: Energy.gov [DOE]

    Reactor Materials Newsletter - Issue 2 The Reactor Materials (RM) newsletter includes information about key nuclear materials programs and results from ongoing projects across the Office of Nuclear Energy.

  18. Emerging critical issues and technology needs

    SciTech Connect (OSTI)

    Arvizu, D.E.; Baker, A.B.

    1997-08-01

    In April 1997, a panel of experts representing private sector electricity companies met to identify emerging critical issues in the electricity sector and to ascertain how technology can help with these issues. Sandia National laboratories sponsored and conducted the meeting. The panel determined the top eight issues that will be critically important over the next five to ten years, when the electricity sector is expected to undergo a major transition in its market and the regulations that govern it. This report presents a discussion of the selection and ranking of critical issues identified by the panel and the research priorities that were identified.

  19. Department of Energy Issues Funding Opportunity Announcement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Science and Engineering Fellowships and Scholarships Department of Energy Issues Funding Opportunity Announcement to U.S. Universities for Nuclear Science and Engineering ...

  20. Failure analysis issues in microelectromechanical systems (MEMS...

    Office of Scientific and Technical Information (OSTI)

    Title: Failure analysis issues in microelectromechanical systems (MEMS). Failure analysis and device characterization of MEMS components are critical steps in understanding the ...

  1. Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a final Request for Proposal (RFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations.

  2. Assistance to States on Policies Related to Wind Energy Issues

    SciTech Connect (OSTI)

    Brown, Matthew, H; Decesaro, Jennifer; DOE Project Officer - Keith Bennett

    2005-07-15

    This final report summarizes work carried out under agreement with the US Department of Energy, related to wind energy policy issues. This project has involved a combination of outreach and publications on wind energy, with a specific focus on educating state-level policymakers. Education of state policymakers is vitally important because state policy (in the form of incentives or regulation) is a crucial part of the success of wind energy. State policymakers wield a significant influence over all of these policies. They are also in need of high quality, non-biased educational resources which this project provided. This project provided outreach to legislatures, in the form of meetings designed specifically for state legislators and legislative staff, responses to information requests on wind energy, and publications. The publications addressed: renewable energy portfolio standards, wind energy transmission, wind energy siting, case studies of wind energy policy, avian issues, economic development, and other related issues. These publications were distributed to legislative energy committee members, and chairs, legislative staff, legislative libraries, and other related state officials. The effect of this effort has been to provide an extensive resource of information about wind information for state policymakers in a form that is useful to them. This non-partisan information has been used as state policymakers attempt to develop their own policy proposals related to wind energy in the states.

  3. Final Technical Report

    SciTech Connect (OSTI)

    Peter McIntyre

    2006-08-16

    This document presents an annual report on our long-term R&D grant for development of new technology for future colliders. The organizing theme of our development is to develop a compact high-field collider dipole, utilizing wind-and-react Nb3Sn coil fabrication, stress man-agement, conductor optimization, bladder preload, and flux plate suppression of magnetization multipoles . The development trail for this new technology began over four years ago with the successful testing of TAMU12, a NbTi model in which we put to a first test many of the construction details of the high-field design. We have built TAMU2, a mirror-geometry dipole containing a single coil module of the 3-module set required for the 14 Tesla design. This first Nb3Sn model was built using ITER conductor which carries much less current than high-performance conductor but enables us to prove in practice our reaction bake and impregnation strategies with ‘free’ su-perconductor. TAMU2 has been shipped to LBNL for testing. Work is beginning on the con-struction of TAMU3, which will contain two coil modules of the 14 Tesla design. TAMU3 has a design field of 13.5 Tesla, and will enable us to fully evaluate the issues of stress management that will be important to the full design. With the completion of TAMU2 and the construction of TAMU3 the Texas A&M group ‘comes of age’ in the family of superconducting magnet R&D laboratories. We have completed the phase of developing core technologies and fixtures and entered the phase of building and testing a succession of TAMU3 model dipoles that each build incrementally upon a proven core design. TAMU3 provides a testbed in which we can build a succession of model dipoles in which each new model uses one new winding module coupled with one module from the previ-ous model, and uses all of the same structural elements in successive models. This incremental development should enable us to keep to a minimum the time between the completion and test-ing of

  4. Final Technical Report

    SciTech Connect (OSTI)

    Dr. Asok K. Ray

    2012-05-22

    During the past decades, considerable theoretical efforts have been devoted to studying the electronic and geometric structures and related properties of surfaces. Such efforts are particularly important for systems like the actinides for which experimental work is relatively difficult to perform due to material problems and toxicity. The actinides are characterized by a gradual filling of the 5f-electron shell with the degree of localization increasing with the atomic number Z along the last series of the periodic table. The open shell of the 5f electrons determines the atomic, molecular, and solid state properties of the actinide elements and their compounds and understanding the quantum mechanics of the 5f electrons is the defining issue in the chemistry and physics of actinide elements. These elements are also characterized by the increasing prominence of relativistic effects and their studies can, in fact, help us understand the role of relativity throughout the periodic table. However, the electronic and geometric structures of the actinides, specifically the trans-uranium actinides and the roles of the 5f electrons in chemical bonding are still not well understood. This is crucial not only for our understanding of the actinides but also for the fact that the actinides constitute 'the missing link' between the d transition elements and the lanthanides. The 5f orbitals have properties intermediate between those of localized 4f and delocalized 3d orbitals. Thus, a proper understanding of the actinides will help us understand the behavior of the lanthanides and transition metals as well. In fact, there is an urgent need for continued extensive and detailed theoretical research in this area to provide significant and deep understandings of the electronic and geometric structures of the actinides. In this work, we have performed electronic structure studies for plutonium (Pu), americium (Am), and curium (Cm) surfaces, and molecular adsorptions on Pu and Am

  5. Final ECR 2008 Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final ECR 2008 Report Final ECR 2008 Report Final ECR 2008 Report Environmental Conflict Resolution Third Annual Report January 2009 (224.55 KB) More Documents & Publications Environmental Conflict Resolution 2009 ECR FINAL REPORT 2010 test

  6. Final Technical Report

    SciTech Connect (OSTI)

    Stenzel, Reiner; Urrutia, J. Manuel

    2009-09-08

    emissions are only observed in whistler spheromaks and FRCs but not in mirrors or asymmetric configurations lacking magnetic null lines. The collisionless electron energization in a toroidal null line usually produces non-Maxwellian distributions. Off the null axis electrons gain more perpendicular than parallel energy. Distributions with T{sub {perpendicular}} > T{sub {parallel}} lead to whistler instabilities which have been observed. A whistler spheromak is a source of high-frequency whistler emissions. These are usually small amplitude whistlers propagating in a complicated background magnetic field. The waves are emitted from a moving source. High frequency whistlers propagate faster than the spheromak, thus partly move ahead of it and partly in the reverse direction. In test wave experiments wave growth opposite to the direction of the hot electron flow has been observed, confirming that Doppler-shifted cyclotron resonance instabilities account for the emission process. Propagating whistler mirrors produce no significant instabilities except when they interact with other fields which exhibit null lines. For example, a whistler mirror has been launched against a stationary FRC, resulting in strong FRC heating and whistler instabilities. In the whistler mirror configuration the antenna near-zone field produces a toroidal null line outside the coil which can also become a source for whistler emissions. Finally, nonlinear EMHD research has been extended to initially unmagnetized plasmas where a new nonlinear skin depth has been discovered. When a small-amplitude oscillating magnetic field is applied to a plasma the field penetration is governed by the skin depth, collisional or collisionless depending on frequency, collision frequency and plasma frequency. However, when the magnetic field increases the electrons become magnetized and the field penetration occurs in the whistler mode if the cyclotron frequency exceeds the oscillating frequency. This phenomenon has been

  7. Multiloop integral system test (MIST): Final report

    SciTech Connect (OSTI)

    Gloudemans, J.R. . Nuclear Power Div.)

    1991-04-01

    The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST program is reported in 11 volumes. Volumes 2 through 8 pertain to groups of Phase 3 tests by type; Volume 9 presents inter-group comparisons; Volume 10 provides comparisons between the RELAP5/MOD2 calculations and MIST observations, and Volume 11 (with addendum) presents the later Phase 4 tests. This is Volume 1 of the MIST final report, a summary of the entire MIST program. Major topics include, Test Advisory Group (TAG) issues, facility scaling and design, test matrix, observations, comparison of RELAP5 calculations to MIST observations, and MIST versus the TAG issues. MIST generated consistent integral-system data covering a wide range of transient interactions. MIST provided insight into integral system behavior and assisted the code effort. The MIST observations addressed each of the TAG issues. 11 refs., 29 figs., 9 tabs.

  8. EIS-0481: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental ...

  9. Energy Impact Illinois - Final Technical Report

    SciTech Connect (OSTI)

    Olson, Daniel; Plagman, Emily; Silberhorn, Joey-Lin

    2014-02-18

    Energy Impact Illinois (EI2) is an alliance of government organizations, nonprofits, and regional utility companies led by the Chicago Metropolitan Agency for Planning (CMAP) that is dedicated to helping communities in the Chicago metropolitan area become more energy efficient. Originally organized as the Chicago Region Retrofit Ramp-Up (CR3), EI2 became part of the nationwide Better Buildings Neighborhood Program (BBNP) in May 2010 after receiving a $25 million award from the U.S. Department of Energy (DOE) authorized through the American Recovery and Reinvestment Act of 2009 (ARRA). The program’s primary goal was to fund initiatives that mitigate barriers to energy efficiency retrofitting activities across residential, multifamily, and commercial building sectors in the seven-county CMAP region and to help to build a sustainable energy efficiency marketplace. The EI2 Final Technical Report provides a detailed review of the strategies, implementation methods, challenges, lessons learned, and final results of the EI2 program during the initial grant period from 2010-2013. During the program period, EI2 successfully increased direct retrofit activity in the region and was able to make a broader impact on the energy efficiency market in the Chicago region. As the period of performance for the initial grant comes to an end, EI2’s legacy raises the bar for the region in terms of helping homeowners and building owners to take action on the continually complex issue of energy efficiency.

  10. Energy Department Issues New Appliance Efficiency Standards ...

    Office of Environmental Management (EM)

    WASHINGTON, DC -- U.S. Secretary of Energy Samuel W. Bodman announced that a final rule to codify fifteen energy efficiency standards for residential appliances and commercial ...

  11. Product and Service Directory 2004 Issue

    SciTech Connect (OSTI)

    Agnihotri, N.K.

    2003-12-01

    This annual November-December issue of the Nuclear Plant Journal serves as directory of information resources on products and services related to the nuclear power industry. The directory consists of over 3,000 products and services submitted by over 300 suppliers worldwide during October and November 2003. The issue is divided into 4 main areas: Products and Services, Corporate Capabilities, and Suppliers.

  12. OHA 2010 ANNUAL REPORT FINAL

    Broader source: Energy.gov (indexed) [DOE]

    ... (FNOV) issued to PUC on September 3, 2009, by the DOE Office of Health, Safety and Security (HSS) under the provisions of 10 CFR Part 851 (Worker Safety and Health Program). ...

  13. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Neath, DOE-RL Nina Menard, Ecology Brett Watson, EnviroIssues Kris Skopeck, DOE-RL Tom Rodgers, WDOH Jen Copeland, MSA Mike Truex, PNNL Kelsey Bondelid, SN3 Annette Cary, Tri-City...

  14. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Q. Does DOE bring any equipment out for the walk downs in order to detect radiation or ... Ecology Hillary Johnson, EnviroIssues Jim Hanson, DOE-RL Arthur Kapell, Ecology Barb ...

  15. Hawaii Clean Energy Final PEIS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A 1 2 Public Notices 3 Notices about the Draft Programmatic EIS Appendix A Hawai i Clean Energy Final PEIS A-1 September 2015 DOE/EIS-0459 The following Notice of Availability appeared in the Federal Register on April 18, 2014. Appendix A Hawai i Clean Energy Final PEIS A-2 September 2015 DOE/EIS-0459 Appendix A Hawai i Clean Energy Final PEIS A-3 September 2015 DOE/EIS-0459 DOE-Hawaii placed the following advertisement in The Garden Island on May 5 and 9, 2014. Appendix A Hawai i Clean Energy

  16. Improving the safety of LWR power plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    This report documents the results of the Study to identify current, potential research issues and efforts for improving the safety of Light Water Reactor (LWR) power plants. This final report describes the work accomplished, the results obtained, the problem areas, and the recommended solutions. Specifically, for each of the issues identified in this report for improving the safety of LWR power plants, a description is provided in detail of the safety significance, the current status (including information sources, status of technical knowledge, problem solution and current activities), and the suggestions for further research and development. Further, the issues are ranked for action into high, medium, and low priority with respect to primarily (a) improved safety (e.g. potential reduction in public risk and occupational exposure), and secondly (b) reduction in safety-related costs (improving or maintaining level of safety with simpler systems or in a more cost-effective manner).

  17. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 18, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION COMMITTEE June 18, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tank Farm Vapors Advice Response ............................................................................................................ 1 Effectiveness of

  18. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 15, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 15, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Environmental Restoration and Disposal Facility Vertical Expansion ......................................................... 2 Committee Business

  19. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE April 12, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Public Involvement ..................................................................................................... 2 Waste Treatment and

  20. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 26, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE April 26, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on Plutonium Finishing Plant ........................................................................................................... 1 Leadership Workshop Preparation, FY 2017

  1. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 14, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE June 14, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Hanford Site Tour ......................................................................................................................................... 2 Status of SWOC/Rev. 9 and 8C.

  2. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 3, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE November 3, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Agency Public Involvement ....................................................................................... 2 Waste Treatment Plant

  3. Final Report: Axion "Roadmap" Workshop

    SciTech Connect (OSTI)

    Rosenberg, Leslie J

    2013-03-19

    Final report for "Vistas in Axion Physics: A Roadmap for Theoretical and Experimental Axion Physics through 2025", which was held at the University of Washington, INT, from April 23 - 26, 2012.

  4. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues. Supplement 3

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ``A Prioritization of Generic Safety Issues,`` which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees.

  5. FTCP Issue Papers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issue Papers FTCP Issue Papers Document Number Subject Disposition FTCP-12-003 Supplemental Competencies Approved by FTCP Chair, December 19, 2012 FTCP-12-001 Use of "Expert Level" in Qualification Path Forward Approved by vote at May 15, 2012 meeting; to delete all reference to expert-level knowledge requirements in FAQS FTCP-10-003 Expert Competencies Pertaining to DOE Orders & Technical Standards Issue transitioned to FY 2011 FTCP Operational Plan Goal #2 FTCP-10-002

  6. Natural gas 1998: Issues and trends

    SciTech Connect (OSTI)

    1999-06-01

    Natural Gas 1998: Issues and Trends provides a summary of the latest data and information relating to the US natural gas industry, including prices, production, transmission, consumption, and the financial and environmental aspects of the industry. The report consists of seven chapters and five appendices. Chapter 1 presents a summary of various data trends and key issues in today`s natural gas industry and examines some of the emerging trends. Chapters 2 through 7 focus on specific areas or segments of the industry, highlighting some of the issues associated with the impact of natural gas operations on the environment. 57 figs., 18 tabs.

  7. PARC Periodical | Vol. 6, Issue 4 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PARC Periodical | Vol. 6, Issue 4 April 6, 2015 PARC Periodical | Vol. 6, Issue 4 VIEW PERIODICAL HERE

  8. PARC Periodical | Volume 6, Issue 5 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Volume 6, Issue 5 June 3, 2015 PARC Periodical | Volume 6, Issue 5 VIEW ARTICLE HERE

  9. California Water Rights Issues | Open Energy Information

    Open Energy Info (EERE)

    Water Rights IssuesLegal Published NA Year Signed or Took Effect 2104 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  10. UESC Contracting Officer Issues Round-Up

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—covers issues and questions contracting officers may have about utility energy service contracts (UESCs).

  11. Energy Department Issues Tribal Energy System Vulnerabilities...

    Broader source: Energy.gov (indexed) [DOE]

    202-586-4940 DOENews@hq.doe.gov The U.S. Department of Energy issued a report today showing that threats to tribal energy infrastructure are expected to increase as climate change ...

  12. Research News January 2015, Issue 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiments and Models Help Predict CO2 Solubility in Brines page 2 the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY From NETL's Office of Research & Development Researchnews June 2015, Issue 9 2 Contents June 2015, Issue 9 2 Feature Story: Experiments and Models Help Predict CO2 Solubility in Brines 4 Novel Techniques for Field Measurement of CO2 in Groundwater 5 New Tool Predicts Behavior of Materials Used in CO2 Capture Processes 6 New Capability Takes Sensor Fabrication to a New

  13. Research News July 2015, Issue 10

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Centrifugal Force Improves Chemical Looping Reactor Performance page 2 the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY From NETL's Office of Research & Development Researchnews October 2015, Issue 13 Contents October 2015, Issue 13 2 Feature Story: Centrifugal Force Improves Chemical Looping Reactor Performance 4 Medical Alloy Nets Another National Award 5 Tapping the Earth's Heat- Regional Workshop Explores Geothermal Possibilities 6 Imagination and Persistence: Words to Live by and

  14. Research News July 2015, Issue 10

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Equation Bolsters Modeling Code page 5 the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY From NETL's Office of Research & Development Researchnews September 2015, Issue 12 Contents September 2015, Issue 12 2 Focus Story: Multiphase Flow Science Solves a Nuclear Site Cleanup Challenge 4 Going Airborne to Find Old Well Sites and Detect Greenhouse Gas Leaks 5 New Equation Bolsters Modeling Code 6 Research Sheds Light on Sensor Material Behavior in Harsh Environments 7 West Virginia

  15. Permeation, Diffusion, Solubility Measurements: Results and Issues |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Permeation, Diffusion, Solubility Measurements: Results and Issues Permeation, Diffusion, Solubility Measurements: Results and Issues Research Objectives: To understand the hydrogen transport behavior Under conditions relevant to hydrogen delivery infrastructure pipeline_group_feng_ms.pdf (1.93 MB) More Documents & Publications Hydrogen Embrittlement Fundamentals, Modeling, and Experiment From Cleanup to Stewardship Results...National Institute of Standards and

  16. Open Discussion of Freeze Related Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Operations at Sub- Freezing Temperatures Open Discussion of Freeze Related Issues Moderator, Doug Wheeler 1. "Using Computational Fluid Dynamics to Understand Freezing in PEMFCs", John Van Zee, University of South Carolina 2. "Freeze Issues & Landscape of Fuel Cell Freeze Patents", Ahmad Pesaran, National Renewable Energy Laboratory 3. "A Study on Performance Degradation of PEMFC by Water Freezing", EunAe Cho, Fuel Cell Research Center, Korea Institute

  17. Los Alamos identifies internal material control issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal material control issue Los Alamos identifies internal material control issue The error relates to internal inventory and accounting that documents movement of sensitive materials within a small portion of Technical Area 55. February 26, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and

  18. Inquiry 2011, Issue 1 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Welcome to Inquiry 2011, Issue 1 "Materials Discovery, Design and Synthesis" This issue of Inquiry highlights the process of systematically developing new materials. The process involves theoretical modeling, informed experimentation and precise characterization to predict what properties a material will have, actually create the material and then measure the properties to determine the success of the synthesis. This new approach to materials development relies on close integration

  19. Inquiry 2011, Issue 2 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Welcome to Inquiry 2011, Issue 2 Materials Characterization This issue of Inquiry focuses on materials characterization, the vast array of techniques that Ames Laboratory scientists use to identify the various characteristics of materials that in turn give those materials specific properties. As you can see by the cover, we are celebrating Ames Laboratory researcher Dan Shechtman's selection as the winner of the 2011 Nobel Prize in Chemistry for the discovery of quasicrystals. But it was while

  20. Inquiry 2013, Issue 2 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, Issue 2 Welcome to Inquiry 2013, Issue 2 The Cutting-Edge Technology at The Ames Laboratory Image Materials characterization has always been a hallmark of the Ames Laboratory. Determining a material's specific properties - its crystal structure, electrical and magnetic properties, how it moves through various phases - gives scientists a better understanding of why it performs or behaves in a certain way and allows them to predict how other materials may behave in similar or different manners.

  1. DOE Issues Energy Sector Cyber Organization NOI

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues National Energy Sector Cyber Organization Notice of Intent February 11, 2010 The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) announced on Jan. 7 that it intends to issue a Funding Opportunity Announcement (FOA) for a National Energy Sector Cyber Organization, envisioned as a partnership between the federal government and energy sector stakeholders to protect the bulk power electric grid and aid the integration of smart grid technology to enhance the security

  2. Call issued for Proton Radiography Facility proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call issued for Proton Radiography Facility proposals Call issued for Proton Radiography Facility proposals The proposal deadline is Feb. 6 for experiments to be carried out during Fiscal Year 2016 (Oct. 1, 2015 to Sept. 30, 2016), with consideration for extensions into FY17. January 5, 2015 Amy Clarke and Seth Imhoff of Materials Technology-Metallurgy (MST-6) align a copper density calibration object for a proton radiography experiment. Amy Clarke and Seth Imhoff of Materials

  3. FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Systems » FIMS Data Validation FIMS Data Validation FIMS Data Validation The Facility Information Management System (FIMS) is the Department's official repository of real property data. The Department relies on the FIMS data for real property decision-making and accounting of its $86B in assets. Maintaining accurate and credible data in FIMS is critical to efficient operations and resource planning. Department of Energy Order 430.1B Real Property Asset Management requires FIMS data

  4. Final 2011 Supplement Analysis of the 2005 Final SWEIS | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Final 2011 Supplement Analysis of the 2005 Final SWEIS Final 2011 Supplement Analysis of the 2005 Final Site-wide Environmental Impact Statement for Continued Operation of LLNL The below final SUPPLEMENT ANALYSIS is available for public viewing. Final 2011 SUPPLEMENT ANALYSIS of the 2005 Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory Below are links to the final comments response and final

  5. Final Design RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Design RM Final Design RM The Final Design (FD) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the technical ...

  6. Issues in midterm analysis and forecasting 1998

    SciTech Connect (OSTI)

    1998-07-01

    Issues in Midterm Analysis and Forecasting 1998 (Issues) presents a series of nine papers covering topics in analysis and modeling that underlie the Annual Energy Outlook 1998 (AEO98), as well as other significant issues in midterm energy markets. AEO98, DOE/EIA-0383(98), published in December 1997, presents national forecasts of energy production, demand, imports, and prices through the year 2020 for five cases -- a reference case and four additional cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. The forecasts were prepared by the Energy Information Administration (EIA), using EIA`s National Energy Modeling System (NEMS). The papers included in Issues describe underlying analyses for the projections in AEO98 and the forthcoming Annual Energy Outlook 1999 and for other products of EIA`s Office of Integrated Analysis and Forecasting. Their purpose is to provide public access to analytical work done in preparation for the midterm projections and other unpublished analyses. Specific topics were chosen for their relevance to current energy issues or to highlight modeling activities in NEMS. 59 figs., 44 tabs.

  7. Final report of the Committee on Interagency Radiation Research and Policy Coordination, 1984-1995

    SciTech Connect (OSTI)

    1995-09-01

    This document is the final report of the Committee on Interagency Radiation Research and Policy Coordination (CIRRPC). The committee was established to address national and international issues involving ionizing and nonionizing radiation. Three sections are included in the report: a summary of CIRRPC`s history structure, and operations; CIRRPC`s most significant activities, findings and recommendations on national radiation issues of sufficient importance and scope to require interagency attention; topics for future consideration by Federal agencies.

  8. MINIMARS conceptual design: Final report

    SciTech Connect (OSTI)

    Lee, J.D.

    1986-09-01

    This volume contains the following sections: (1) fueling systems; (2) blanket; (3) alternative blanket concepts; (4) halo scraper/direct converter system study and final conceptual design; (5) heat-transport and power-conversion systems; (6) tritium systems; (7) minimars air detritiation system; (8) appropriate radiological safety design criteria; and (9) cost estimate. (MOW)

  9. BP-12 Final Models Datasets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MB, XLS) Tier 2 Module of RAM RAM Tier 2 Pricing Module (4.8 MB, XLS) Tool Kit Files (TPP) ToolKit v4.8.1 BP-12 Final Studies Release 4-Aug-11 (12.5 MB, XLS) Risk Mod Output...

  10. Microsoft Word - Abengoa Final EA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    683 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO ABENGOA SOLAR INC. FOR THE SOLANA THERMAL ELECTRIC POWER PROJECT NEAR GILA BEND, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 May 2010 DOE/EA-1683 i CONTENTS Acronynms and Abbreviations ................................................................................................. viii SUMMARY

  11. Final Rule (October 23, 2007)

    Broader source: Energy.gov [DOE]

    Loan Guarantees for Projects That Employ Innovative Technologies; Final Rule: On May 16, 2007, the Department of Energy (DOE or the Department) published a Notice of Proposed Rulemaking and opportunity for comment (NOPR) to establish regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (Title XVII or the Act).

  12. Convective Radio Occultations Final Campaign Summary (Technical...

    Office of Scientific and Technical Information (OSTI)

    Convective Radio Occultations Final Campaign Summary Citation Details In-Document Search Title: Convective Radio Occultations Final Campaign Summary Deep convective systems are ...

  13. Biofuels Report Final | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biofuels Report Final Biofuels Report Final Liquid biofuels produced from lignocellulosic biomass can significantly reduce our dependence on foreign oil, create new jobs, improve ...

  14. EIS-0161: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  15. EIS-0229: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  16. ERDA-1537: Final Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  17. EIS-0269: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  18. Ocean Thermal Extractable Energy Visualization: Final Technical...

    Office of Environmental Management (EM)

    Ocean Thermal Extractable Energy Visualization: Final Technical Report Ocean Thermal Extractable Energy Visualization: Final Technical Report Report about the Ocean Thermal ...

  19. Study of a final focus system for high intensity beams

    SciTech Connect (OSTI)

    Henestroza, Enrique; Eylon, Shmuel; Roy, Prabir K.; Yu, Simon S.; Bieniosek, Frank M.; Shuman, Derek B.; Waldron, William L.

    2004-06-01

    The NTX experiment at the Heavy Ion Fusion Virtual National Laboratory is exploring the performance of neutralized final focus systems for high perveance heavy ion beams. The final focus scenario in an HIF driver consists of several large aperture quadrupole magnets followed by a drift section in which the beam space charge is neutralized by a plasma. This beam is required to hit a millimeter-sized target spot at the end of the drift section. The objective of the NTX experiments and associated theory and simulations is to study the various physical mechanisms that determine the final spot size (radius r{sub s}) at a given distance (f) from the end of the last quadrupole. In a fusion driver, f is the standoff distance required to keep the chamber wall and superconducting magnets properly protected. The NTX final quadrupole focusing system produces a converging beam at the entrance to the neutralized drift section where it focuses to a small spot. The final spot is determined by the conditions of the beam entering the quadrupole section, the beam dynamics in the magnetic lattice, and the plasma neutralization dynamics in the drift section. The main issues are the control of emittance growth due to high order fields from magnetic multipoles and image fields. In this paper, we will describe the theoretical and experimental aspects of the beam dynamics in the quadrupole lattice, and how these physical effects influence the final beam size. In particular, we present theoretical and experimental results on the dependence of final spot size on geometric aberrations and perveance.

  20. EFRT M-12 Issue Resolution: Solids Washing

    SciTech Connect (OSTI)

    Baldwin, David L.; Schonewill, Philip P.; Toth, James J.; Huckaby, James L.; Eslinger, Paul W.; Hanson, Brady D.; Kurath, Dean E.; Minette, Michael J.

    2010-01-01

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, Undemonstrated Leaching Processes of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

  1. Outage management and health physics issue, 2007

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2007-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: India: a potential commercial opportunity, a U.S. Department of Commerce Report, by Joe Neuhoff and Justin Rathke; The changing climate for nuclear energy, by Skip Bowman, Nuclear Energy Insitute; Selecting protective clothing, by J. Mark Price, Southern California Edison; and Succssful refurbishment outage, by Sudesh K. Gambhir, Omaha Public Power District. Industry innovation articles in this issue are: Containment radiation monitoring spiking, by Michael W. Lantz and Robert Routolo, Arizona Public Service Company; Improved outage performance, by Michael Powell and Troy Wilfong, Arizona Public Service Company, Palo Verde Nuclear Generating Station; Stop repacking valves and achieve leak-free performance, by Kenneth Hart, PPL Susquehanna LLC; and Head assembly upgrade package, by Timothy Petit, Dominion Nuclear.

  2. Weapons dismantlement issues in independent Ukraine

    SciTech Connect (OSTI)

    Zack, N.R. . Safeguards Systems Group); Kirk, E.J. )

    1995-02-01

    The American Association for the Advancement of Science sponsored a seminar during September 1993 in Kiev, Ukraine, titled, Toward a Nuclear-Free Future--Barriers and Problems.'' It brought together Ukrainians, Belarusians and Americans to discuss the legal, political, economic, technical, and safeguards and security dimensions of nuclear weapons dismantlement and destruction. US representatives initiated discussions on legal and treaty requirements and constraints, safeguards and security issues surrounding dismantlement, storage and disposition of nuclear materials, warhead transportation, and economic considerations. Ukrainians gave presentations on arguments for and against the Ukraine keeping nuclear weapons, the Ukrainian Parliament's nonapproval of START 1, alternative strategies for dismantling silos and launchers, and economic and security implications of nuclear weapons removal from the Ukraine. Participants from Belarus discussed proliferation and control regime issues. This paper will highlight and detail the issues, concerns and possible impacts of the Ukraine's dismantlement of its nuclear weapons.

  3. Congressional Final House Final Senate Current Request Mark

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 FY 2010 FY 2010 FY 2010 ($ in thousands) Congressional Final House Final Senate Current Request Mark Mark Appropriation FOSSIL ENERGY R&D Coal 368,865 394,315 428,200 393,485 Natural Gas Technologies 25,000 25,000 25,000 17,364 Unconventional Fossil Energy Technologies 0 0 25,000 19,474 Program Direction 158,000 158,000 158,000 158,000 Plant & Capital Equipment 20,000 20,000 20,000 20,000 Environmental Restoration 10,000 10,000 10,000 10,000 Cooperative Res. & Development 0 0 5,000

  4. Expedited technology demonstration project final report: final forms

    SciTech Connect (OSTI)

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  5. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  6. Decontamination, decommissioning, and vendor advertorial issue, 2006

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2006-07-15

    The focus of the July-August issue is on Decontamination, decommissioning, and vendor advertorials. Major articles/reports in this issue include: NPP Krsko revised decommissioning program, by Vladimir Lokner and Ivica Levanat, APO d.o.o., Croatia, and Nadja Zeleznik and Irena Mele, ARAO, Slovenia; Supporting the renaissance, by Marilyn C. Kray, Exelon Nuclear; Outage world an engineer's delight, by Tom Chrisopher, Areva, NP Inc.; Optimizing refueling outages with R and D, by Ross Marcoot, GE Energy; and, A successful project, by Jim Lash, FirstEnergy.

  7. DOE Releases Final Request for Proposal for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deactivation and Remediation Services | Department of Energy Releases Final Request for Proposal for Paducah Gaseous Diffusion Plant Deactivation and Remediation Services DOE Releases Final Request for Proposal for Paducah Gaseous Diffusion Plant Deactivation and Remediation Services July 21, 2016 - 2:00pm Addthis Media Contact: Lynette Chafin, 513-246-0461 Cincinnati -- The U.S. Department of Energy (DOE) today issued a Request for Proposals (RFP) for deactivation and remediation services

  8. DOE Releases Final Request for Proposal for Waste Isolation Pilot Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (WIPP) Transportation Services Procurement | Department of Energy Waste Isolation Pilot Plant (WIPP) Transportation Services Procurement DOE Releases Final Request for Proposal for Waste Isolation Pilot Plant (WIPP) Transportation Services Procurement July 14, 2016 - 1:00pm Addthis Media Contact: Bill Taylor, 575-234-7591 Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Final Request for Proposal (RFP) for Waste

  9. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  10. University Prosperity Game. Final report

    SciTech Connect (OSTI)

    Boyack, K.W.; Berman, M.

    1996-03-01

    Prosperity Games are an outgrowth and adaptation of move/countermove and seminar War Games. Prosperity Games are simulations that explore complex issues in a variety of areas including economics, politics, sociology, environment, education and research. These issues can be examined from a variety of perspectives ranging from a global, macroeconomic and geopolitical viewpoint down to the details of customer/supplier/market interactions in specific industries. All Prosperity Games are unique in that both the game format and the player contributions vary from game to game. This report documents the University Prosperity Game conducted under the sponsorship of the Anderson Schools of Management at the University of New Mexico. This Prosperity Game was initially designed for the roadmap making effort of the National Electronics Manufacturing Initiative (NEMI) of the Electronics Subcommittee of the Civilian Industrial Technology Committee under the aegis of the National Science and Technology Council. The game was modified to support course material in MGT 508, Ethical, Political, and Social Environment of Business. Thirty-five students participated as role players. In this educational context the game`s main objectives were to: (1) introduce and teach global competitiveness and business cultures in an experiential classroom setting; (2) explore ethical, political, and social issues and address them in the context of global markets and competition; and (3) obtain non-government views regarding the technical and non-technical (i.e., policy) issues developed in the NEMI roadmap-making endeavor. The negotiations and agreements made during the game, along with the student journals detailing the players feelings and reactions to the gaming experience, provide valuable insight into the benefits of simulation as an advanced learning tool in higher education.

  11. Environmental Prosperity Game. Final report

    SciTech Connect (OSTI)

    Berman, M.; Boyack, K.; VanDevender, J.P.

    1995-12-01

    Prosperity Games are an outgrowth and adaptation of move/countermove and seminar War Games. Prosperity Games are simulations that explore complex issues in a variety of areas including economics, politics, sociology, environment, education and research. These issues can be examined from a variety of perspectives ranging from a global, macroeconomic and geopolitical viewpoint down to the details of customer/supplier/market interactions in specific industries. All Prosperity Games are unique in that both the game format and the player contributions vary from game to game. This report documents the Environmental Prosperity Game conducted under the sponsorship of the Silicon Valley Environmental Partnership. Players were drawn from all stakeholders involved in environmental technologies including small and large companies, government, national laboratories, universities, environmentalists, the legal profession, finance, and the media. The primary objectives of this game were to: investigate strategies for developing a multi-agency (national/state/regional), one-step regulatory approval process for certifying and implementing environmental technologies and evaluating the simulated results; identify the regulatory hurdles and requirements, and the best approaches for surmounting them; identify technical problems and potential resources (environmental consultants, labs, universities) for solving them. The deliberations and recommendations of these players provided valuable insights as to the views of this diverse group of decision makers concerning environmental issues, including the development, licensing, and commercialization of new technologies.

  12. Renewable energy 1998: Issues and trends

    SciTech Connect (OSTI)

    1999-03-01

    This report presents the following five papers: Renewable electricity purchases: History and recent developments; Transmission pricing issues for electricity generation from renewable resources; Analysis of geothermal heat pump manufacturers survey data; A view of the forest products industry from a wood energy perspective; and Wind energy developments: Incentives in selected countries. A glossary is included. 19 figs., 27 tabs.

  13. PETC Review, Issue 5, Spring 1992

    SciTech Connect (OSTI)

    Blaustein, B D; Reiss, J; Tarquinio, M A; Brown, J; Evans, E

    1992-04-01

    This issue of PETC Review contains short discussion on the following topics: advanced coal preparation processes, new scrubbers for flue gas desulfurization, PETC's Coal Preparation Process Research Facility, and PETC's Science Outreach Program. Supplemental sections on publications, highlights, calendars, etc. are also included. (VC)

  14. PETC Review, Issue 5, Spring 1992

    SciTech Connect (OSTI)

    Blaustein, B.D.; Reiss, J.; Tarquinio, M.A.; Brown, J.; Evans, E.

    1992-07-01

    This issue of PETC Review contains short discussion on the following topics: advanced coal preparation processes, new scrubbers for flue gas desulfurization, PETC`s Coal Preparation Process Research Facility, and PETC`s Science Outreach Program. Supplemental sections on publications, highlights, calendars, etc. are also included. (VC)

  15. Environmental issues affecting clean coal technology deployment

    SciTech Connect (OSTI)

    Miller, M.J.

    1997-12-31

    The author outlines what he considers to be the key environmental issues affecting Clean Coal Technology (CCT) deployment both in the US and internationally. Since the international issues are difficult to characterize given different environmental drivers in various countries and regions, the primary focus of his remarks is on US deployment. However, he makes some general remarks, particularly regarding the environmental issues in developing vs. developed countries and how these issues may affect CCT deployment. Further, how environment affects deployment depends on which particular type of clean coal technology one is addressing. It is not the author`s intention to mention many specific technologies other than to use them for the purposes of example. He generally categorizes CCTs into four groups since environment is likely to affect deployment for each category somewhat differently. These four categories are: Precombustion technologies such as coal cleaning; Combustion technologies such as low NOx burners; Postcombustion technologies such as FGD systems and postcombustion NOx control; and New generation technologies such as gasification and fluidized bed combustion.

  16. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Argonne National Laboratory | Department of Energy Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office

  17. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fermi National Accelerator Laboratory | Department of Energy Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National

  18. DOE Issues RFP for West Valley Demonstration Project Probabilistic Performance Assessment

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP) for the West Valley Demonstration Project Probabilistic Performance Assessment (WVDP-PPA) procurement that will provide support to the DOE, West Valley Demonstration Project, and the New York State Energy Research and Development Authority in performing a probabilistic analysis to support the Phase 2 Decision making Alternative for the West Valley Demonstration Project and Western New York Nuclear Service Center.

  19. DOE Issues a Notice of Proposed Rulemaking and Announcement of Public

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Pertaining to Test Procedure for Walk-in Coolers and Walk-in Freezers | Department of Energy NOPR_Public Meeting_Notice (663.4 KB) More Documents & Publications CX-008013: Categorical Exclusion Determination DOE Issues a Notice of Proposed Rulemaking and Announcement of Public Meeting Pertaining to Test Procedure for Walk-in Coolers and Walk-in Freezers 2014-05-08 Issuance: Energy Conservation Standards for Walk-in Coolers and Freezers; Final Rule

  20. Final DOE Areas Feasibility Study

    Office of Legacy Management (LM)

    Management, Washington, DC Weiss Associates Environmental Science, Engineering and Management FINAL DOE AREAS FEASIBILITY STUDY for the: LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH UNIVERSITY OF CALIFORNIA, DAVIS Prepared for: SM Stoller Corporation 2597 B ¾ Road Grand Junction, Colorado 81503 Prepared by: Weiss Associates 5801 Christie Avenue, Suite 600 Emeryville, California 94608-1827 March 07, 2008 Rev. 0 J:\DOE_STOLLER\4110\143\FEASIBILITY_STUDY\20080307_FS_TEXT_REV0.DOC WEISS ASSOCIATES

  1. Air cleaning issues with contaminated sites

    SciTech Connect (OSTI)

    Bellamy, R.R.

    1997-08-01

    The US Nuclear Regulatory Commission has developed a list of contaminated sites that warrant special USNRC attention because they pose unique or complex decommissioning issues. This list of radiologically contaminated sites is termed the Site Decommissioning Management Plan (SDMP), and was first issued in 1990. A site is placed on the SDMP list if it has; (1) Problems with the viability of the responsible organization (e.g., the licensee for the site is unable or unwilling to pay for the decommissioning); (2) Large amounts of soil contamination or unused settling ponds or burial grounds that may make the waste difficult to dispose of; (3) The long-term presence of contaminated, unused buildings; (4) A previously terminated license; or (5) Contaminated or potential contamination of the ground water from on-site wastes. In deciding whether to add a site to the SDMP list, the NRC also considers the projected length of time for decommissioning and the willingness of the responsible organization to complete the decommissioning in a timely manner. Since the list was established, 9 sites have been removed from the list, and the current SDMP list contains 47 sites in 11 states. The USNRC annually publishes NUREG-1444, {open_quotes}Site Decommissioning Management Plan{close_quotes}, which updates the status of each site. This paper will discuss the philosophical goals of the SDMP, then will concentrate on the regulatory requirements associated with air cleaning issues at the SDMP sites during characterization and remediation. Both effluent and worker protection issues will be discussed. For effluents, the source terms at sites will be characterized, and measurement techniques will be presented. Off-site dose impacts will be included. For worker protection issues, air sampling analyses will be presented in order to show how the workers are adequately protected and their doses measured to satisfy regulatory criteria during decontamination operations. 1 tab.

  2. Across the Pond Newsletter Issue 7 | Department of Energy

    Energy Savers [EERE]

    Across the Pond Newsletter Issue 7 A Quarterly Update on Joint UK NDAUS DOE Activities and Initiatives Issue 7: Spring 2012. In this issue: DOE and UK NDA Renew Information ...

  3. Simulated coal gas MCFC power plant system verification. Final report

    SciTech Connect (OSTI)

    1998-07-30

    The objective of the main project is to identify the current developmental status of MCFC systems and address those technical issues that need to be resolved to move the technology from its current status to the demonstration stage in the shortest possible time. The specific objectives are separated into five major tasks as follows: Stack research; Power plant development; Test facilities development; Manufacturing facilities development; and Commercialization. This Final Report discusses the M-C power Corporation effort which is part of a general program for the development of commercial MCFC systems. This final report covers the entire subject of the Unocal 250-cell stack. Certain project activities have been funded by organizations other than DOE and are included in this report to provide a comprehensive overview of the work accomplished.

  4. Interaction Region Issues at the NLC

    SciTech Connect (OSTI)

    Markiewicz, Thomas W.; Maruyama, T.; /SLAC

    2007-09-26

    Two detector concepts are being investigated for the Next Linear Collider. This paper discusses the current design of the interaction region for one of them, based on a 6 Tesla solenoid and silicon based tracking. Topics include masking layout, backgrounds and the suppression of final quadrupole jitter. All calculations are based on the 1 TeV design parameters.

  5. DOE Releases Final Request for Proposal for Savannah River Site Liquid

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Services | Department of Energy Savannah River Site Liquid Waste Services DOE Releases Final Request for Proposal for Savannah River Site Liquid Waste Services June 30, 2016 - 3:00pm Addthis Media Contact: Media Contact: Jim Giusti, 803-952-7684 Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP) for liquid waste services at the Savannah River Site (SRS). The Final RFP primarily includes cost-plus-award-fee contract line items for the

  6. Bibliography of Literature for Avian Issues in Solar and Wind...

    Office of Scientific and Technical Information (OSTI)

    Bibliography of Literature for Avian Issues in Solar and Wind Energy and Other Activities Citation Details In-Document Search Title: Bibliography of Literature for Avian Issues in ...

  7. Future Fuels: Issues and Opportunities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuels: Issues and Opportunities Future Fuels: Issues and Opportunities 2005 Diesel Engine Emissions Reduction (DEER) Conference Presentations and Posters PDF icon...

  8. Vehicle Technologies Office Issues Notice of Intent for Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addthis Related Articles Vehicle Technologies Office Issues Notice of Intent for SuperTruck II Funding Opportunity Announcement Vehicle Technologies Office Issues Notice of Intent ...

  9. AMO Issues Request for Information on Clean Energy Manufacturing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AMO Issues Request for Information on Clean Energy Manufacturing Topics, Including Fuel Cell and Hydrogen Applications AMO Issues Request for Information on Clean Energy ...

  10. Energy Department Issues Tribal Renewable Energy Purchase Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project...

  11. Orders Granting Natural Gas, LNG & CNG Authorizations Issued...

    Office of Environmental Management (EM)

    Orders Granting Natural Gas, LNG & CNG Authorizations Issued in 2014 Orders Granting Natural Gas, LNG & CNG Authorizations Issued in 2014 Order 3378 - Encana Natural Gas Inc. Order...

  12. Across the Pond Newsletter Issue 1 | Department of Energy

    Office of Environmental Management (EM)

    on Joint UK NDAUS DOE Activities and Initiatives Issue 1: Summer 2009. In this issue: The US Department of Energy (DOE) UK Nuclear Decommissioning Authority (NDA) Bilateral ...

  13. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Energy Savers [EERE]

    ... Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and ...

  14. Update on Tribal Issues - Mapping Tool, Policy Statement, and...

    Office of Environmental Management (EM)

    Issues - Mapping Tool, Policy Statement, and Protocol Manual Update on Tribal Issues - Mapping Tool, Policy Statement, and Protocol Manual Presentation made by Stuart Easson for...

  15. Department of Energy Issues Loan Guarantee Supported by Recovery...

    Energy Savers [EERE]

    Issues Loan Guarantee Supported by Recovery Act for Nevada Geothermal Project Department of Energy Issues Loan Guarantee Supported by Recovery Act for Nevada Geothermal Project ...

  16. Nuclear Procurement Issues Committee NUPIC | Open Energy Information

    Open Energy Info (EERE)

    Procurement Issues Committee NUPIC Jump to: navigation, search Name: Nuclear Procurement Issues Committee (NUPIC) Place: Brownville, Tennessee Zip: 68321 Sector: Services Product:...

  17. Safeguards Issues at Nuclear Reactors and Enrichment Plants ...

    Office of Scientific and Technical Information (OSTI)

    Safeguards Issues at Nuclear Reactors and Enrichment Plants Citation Details In-Document Search Title: Safeguards Issues at Nuclear Reactors and Enrichment Plants Authors: Boyer, ...

  18. Department of Energy Issues Draft Renewable Energy and Efficient...

    Energy Savers [EERE]

    Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy ...

  19. Notice of Intent to Issue Funding for Clean Energy Manufacturing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Issue Funding for Clean Energy Manufacturing Innovation Institute Notice of Intent to Issue Funding for Clean Energy Manufacturing Innovation Institute May 13, ...

  20. Forest Carbon and Biomass Energy - LCA Issues and Challenges...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forest Carbon and Biomass Energy - LCA Issues and Challenges Forest Carbon and Biomass Energy - LCA Issues and Challenges Breakout Session 2D-Building Market Confidence and ...

  1. DOE issues Finding of No Significant Impact for the Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory DOE issues ...

  2. Safeguards Issues at Nuclear Reactors and Enrichment Plants ...

    Office of Scientific and Technical Information (OSTI)

    Safeguards Issues at Nuclear Reactors and Enrichment Plants Citation Details In-Document Search Title: Safeguards Issues at Nuclear Reactors and Enrichment Plants You are ...

  3. Open Issues in the Development of Safety Standards for Compressed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues in the Development of Safety Standards for Compressed Hydrogen Storage at SAE-International Open Issues in the Development of Safety Standards for Compressed Hydrogen...

  4. DOE Issues 85th Lessons Learned Quarterly Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CORRECTED: DOE Issues 85th Lessons Learned Quarterly Report DOE Issues 82nd Lessons Learned Quarterly Report DOE Announces Webinars on Geography of Alternative Fuels, Wind Siting ...

  5. General Counsel's Office Issues Guidance on Inherently Governmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    General Counsel's Office Issues Guidance on Inherently Governmental Functions General Counsel's Office Issues Guidance on Inherently Governmental Functions February 4, 2011 -...

  6. DOE Issues Request for Information on a Hydrogen Technology Showcase...

    Energy Savers [EERE]

    Issues Request for Information on a Hydrogen Technology Showcase and Training (HyTeST) Station DOE Issues Request for Information on a Hydrogen Technology Showcase and Training ...

  7. Department of Energy Data Access and Privacy Issues Related To...

    Office of Environmental Management (EM)

    Data Access and Privacy Issues Related To Smart Grid Technologies Department of Energy Data Access and Privacy Issues Related To Smart Grid Technologies This report by the ...

  8. Public Roundtable- Data Access and Privacy Issues Related to...

    Energy Savers [EERE]

    Roundtable- Data Access and Privacy Issues Related to Smart Grid Technologies Public Roundtable- Data Access and Privacy Issues Related to Smart Grid Technologies Transcript of ...

  9. Critical Issues in NPH Categorization and Limit State Selection...

    Office of Environmental Management (EM)

    Critical Issues in NPH Categorization and Limit State Selection of Structures, Systems, and Components Quazi Hossain Lawrence Livermore National Laboratory Critical Issues in NPH ...

  10. Burst of Energy. Final report

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    The Discovery Center of Idaho (DCI) was the recipient of a grant from US DOE`s Museum Science Education Program to build six permanent energy related exhibits to provide the public with hands-on experience with energy issues. Because of its volunteer support system, DC was able to build eleven exhibits. These exhibits are described and photographs are included. The signs used for the exhibits are reproduced as well as the materials used to advertise them to the public. Examples of DCI`s newsletter are included that mention the new exhibits.

  11. Microsoft Word - Interpretive Guidance FINAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 2, 2011 INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 This guidance is intended to clarify the Department of Energy (DOE)'s interpretation of 10 C.F.R. § 205.322, which sets forth the contents of an application for a Presidential permit issued by DOE under Executive Order (E.O.) 10485, as amended by E.O. 12038. Anyone seeking to construct, operate, maintain, or connect an electric transmission facility crossing the borders of the United States must first obtain a

  12. Microsoft Word - Mod 207 - Final

    National Nuclear Security Administration (NNSA)

    1 71 2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REOUISITIONIPURCHASE REO NO. 15. PROJECT NO. (If applicable) 207 09116/2010 6. ISSUED BY CODE 05007 7. ADMINISTERED BY (If other than Item 6) CODe 105007 Nl\SA/Pantex Site Office NNSA/Pantex Site Office u.S. Department of Energy U.S. Department of Energy N)JS."./Pantex Site Office NNSA/Pantex Site Office P.O. Box 30030 P.O. Box 30030 Amarillo TX 79120-0030 Amarillo TX 79120-0030 8. NAME AND ADDRESS OF CONTRACTOR (No., _ I , county,

  13. Resolution of thermal-hydraulic safety and licensing issues for the system 80+{sup {trademark}} design

    SciTech Connect (OSTI)

    Carpentino, S.E.; Ritterbusch, S.E.; Schneider, R.E.

    1995-09-01

    The System 80+{sup {trademark}} Standard Design is an evolutionary Advanced Light Water Reactor (ALWR) with a generating capacity of 3931 MWt (1350 MWe). The Final Design Approval (FDA) for this design was issued by the Nuclear Regulatory Commission (NRC) in July 1994. The design certification by the NRC is anticipated by the end of 1995 or early 1996. NRC review of the System 80+ design has involved several new safety issues never before addressed in a regulatory atmosphere. In addition, conformance with the Electric Power Research Institute (EPRI) ALWR Utility Requirements Document (URD) required that the System 80+ plant address nuclear industry concerns with regard to design, construction, operation and maintenance of nuclear power plants. A large number of these issues/concerns deals with previously unresolved generic thermal-hydraulic safety issues and severe accident prevention and mitigation. This paper discusses the thermal-hydraulic analyses and evaluations performed for the System 80+ design to resolve safety and licensing issues relevant to both the Nuclear Stream Supply System (NSSS) and containment designs. For the NSSS design, the Safety Depressurization System mitigation capability and resolution of the boron dilution concern are described. Examples of containment design issues dealing with containment shell strength, robustness of the reactor cavity walls and hydrogen mixing under severe accident conditions are also provided. Finally, the overall approach used in the application of NRC`s new (NUREG-1465) radiological source term for System 80+ evaluation is described. The robustness of the System 80+ containment design to withstand severe accident consequences was demonstrated through detailed thermal-hydraulic analyses and evaluations. This advanced design to shown to meet NRC severe accident policy goals and ALWR URD requirements without any special design features and unnecessary costs.

  14. Research News January 2015, Issue 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cathode Infiltration Improves Fuel Cell Performance page 3 the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY From NETL's Office of Research & Development Researchnews April 2015, Issue 7 2 FE AT U RE ST O RY : C a th o d e In fi lt ra ti o n Im p ro v e F u e l C e ll P e rf o F ro m N E T L' s O ff ic e o f R e s e a rc h & D e v e lo p m e n t R e s e a r c h n e w s Ap ril 20 15 , Is su e 7 Contents April 2015, Issue 7 2 Editorial: NETL's In-House Research Competencies 3 Feature

  15. Research News January 2015, Issue 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Flowing Free: Promoting Chemical Looping Combustion page 3 the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY From NETL's Office of Research & Development Researchnews January 2015, Issue 4 2 FE AT U RE ST O RY : F lo w in g F re e : P ro m o ti n g C h e m ic a l L o o p in g C o m b u s ti o n pa ge 3 F ro m N E T L' s O ff ic e o f R e s e a rc h & D e v e lo p m e n t R e s e a r c h n e w s Ja nu ar y 20 15 , Is su e 4 Contents January 2015, Issue 4 2 Editorial: Integrating Safety

  16. Research News January 2015, Issue 4

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Going to New Extremes- Application of Advanced Sensors for Subsurface Monitoring page 4 the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY From NETL's Office of Research & Development Researchnews May 2015, Issue 8 2 FO C U S ST O RY : G o in g to N e w E x tr e m e s - A p p li c a ti o n o f F ro m N E T L' s O ff ic e o f R e s e a rc h & D e v e lo p m e n t R e s e a r c h n e w s M ay 20 15 , Is su e 8 Contents May 2015, Issue 8 2 Feature Story: Clearing the Hurdles: NETL's

  17. Research News July 2015, Issue 10

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alloy Raises the Bar for High-Temperature Performance page 3 the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY From NETL's Office of Research & Development Researchnews July 2015, Issue 10 FE AT U RE ST O RY : A ll o y R a is e s th e B a r fo r H ig h -T e m p e ra F ro m N E T L' s O ff ic e o f R e s e a rc h & D e v e lo p m e n t R e s e a r c h n e w s Ju ly 20 15 , Is su e 10 Contents July 2015, Issue 10 2 Editorial: NETL's Educational Programs 3 Feature Story: Alloy Raises the

  18. Outage management and health physics issue, 2006

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2006-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: A design with experience for the U.S., by Michael J. Wallace, Constellation Generation Group; Hope to be among the first, by Randy Hutchinson, Entergy Nuclear; Plans to file COLs in 2008, by Garry Miller, Progress Energy; Evolution of ICRP's recommendations, by Lars-Erik Holm, ICRP; European network on education and training in radiological protection, by Michele Coeck, SCK-CEN, Belgium; Outage managment: an important tool for improving nuclear power plant performance, by Thomas Mazour and Jiri Mandula, IAEA, Austria; and Plant profile: Exploring new paths to excellence, by Anne Thomas, Exelon Nuclear.

  19. Harmonics and Resonance Issues with Wind Plants

    SciTech Connect (OSTI)

    Bradt, M.; Badrzadeh, Babak; Camm, E H; Castillo, Nestor; Mueller, David; Siebert, T.; Schoene, Jens; Smith, Travis M; Starke, Michael R; Walling, R.

    2011-01-01

    Wind plants are susceptible to lightly-damped resonances which can attract and amplify ambient grid harmonic distortion and magnify wind turbine harmonic generation. Long-accepted harmonic modeling assumptions and practices are not appropriate for wind plants. VSCs are not ideal current sources and grid impedance is important. Attention to modeling detail and thorough evaluation over range of conditions is critical to meaningful analysis. In general, wind turbines are very slight sources of harmonics. Most harmonic issues are a result of resonance, caused by capacitor banks (for reactive power compensation) or from the extensive underground cabling in a collector system. Converter controls instability can be exacerbated by power system resonances. In some cases this has caused severe voltage distorDon and other problems. The IEEE 519 recommended guidelines are very restrictive. I recommend that they are used to resolve serious harmonic issues, and not to create petty problems.

  20. Natural gas 1995: Issues and trends

    SciTech Connect (OSTI)

    1995-11-01

    Natural Gas 1995: Issues and Trends addresses current issues affecting the natural gas industry and markets. Highlights of recent trends include: Natural gas wellhead prices generally declined throughout 1994 and for 1995 averages 22% below the year-earlier level; Seasonal patterns of natural gas production and wellhead prices have been significantly reduced during the past three year; Natural gas production rose 15% from 1985 through 1994, reaching 18.8 trillion cubic feet; Increasing amounts of natural gas have been imported; Since 1985, lower costs of producing and transporting natural gas have benefitted consumers; Consumers may see additional benefits as States examine regulatory changes aimed at increasing efficiency; and, The electric industry is being restructured in a fashion similar to the recent restructuring of the natural gas industry.

  1. BARRIER ISSUES TO THE UTILIZATION OF BIOMASS

    SciTech Connect (OSTI)

    Greg F. Weber; Christopher J. Zygarlicke

    2001-05-01

    In summary, stoker-fired boilers that cofire or switch to biomass fuel may potentially have to deal with ash behavior issues such as production of different concentrations and quantities of fine particulate or aerosols and ash-fouling deposition. Stoker boiler operators that are considering switching to biomass and adding potential infrastructure to accommodate the switch may also at the same time be looking into upgrades that will allow for generating additional power for sale on the grid. This is the case for the feasibility study being done currently for a small (<1-MW) stoker facility at the North Dakota State Penitentiary, which is considering not only the incorporation of a lower-cost biomass fuel but also a refurbishing of the stoker boiler to burn slightly hotter with the ability to generate more power and sell excess energy on the grid. These types of fuel and boiler changes can greatly affect ash behavior issues.

  2. MEMS Packaging - Current Issues and Approaches

    SciTech Connect (OSTI)

    DRESSENDORFER,PAUL V.; PETERSON,DAVID W.; REBER,CATHLEEN ANN

    2000-01-19

    The assembly and packaging of MEMS (Microelectromechanical Systems) devices raise a number of issues over and above those normally associated with the assembly of standard microelectronic circuits. MEMS components include a variety of sensors, microengines, optical components, and other devices. They often have exposed mechanical structures which during assembly require particulate control, space in the package, non-contact handling procedures, low-stress die attach, precision die placement, unique process schedules, hermetic sealing in controlled environments (including vacuum), and other special constraints. These constraints force changes in the techniques used to separate die on a wafer, in the types of packages which can be used in the assembly processes and materials, and in the sealing environment and process. This paper discusses a number of these issues and provides information on approaches being taken or proposed to address them.

  3. Failure analysis issues in microelectromechanical systems (MEMS).

    SciTech Connect (OSTI)

    Walraven, Jeremy Allen

    2005-07-01

    Failure analysis and device characterization of MEMS components are critical steps in understanding the root causes of failure and improving device performance. At the wafer and die level these tasks can be performed with little or no sample preparation. Larger challenges occur after fabrication when the device is packaged, capped, sealed, or otherwise obstructed from view. The challenges and issues of MEMS failure analysis lie in identifying the root cause of failure for these packaged, capped, and sealed devices without perturbing the device or its immediate environment. Novel methods of gaining access to the device or preparing the device for analysis are crucial to accurately determining the root cause of failure. This paper will discuss issues identified in performing root cause failure analysis of packaged MEMS devices, as well as the methods employed to analyze them.

  4. PETC Review, Issue 2, September 1990

    SciTech Connect (OSTI)

    Blaustein, B.; Reiss, J.; Riehle, B.; Brown, J.; Hammer, D.

    1990-09-01

    This issue of PETC Review provides short discussion on research programs in (1) combustion technology, (2) flue gas cleanup technology, (3) coal science and chemistry. An overview of the PETC New Fuels Evaluation Facility is given, the US Clean Coal Technology Program`s activities in Poland are discussed, and the NOXSO flue gas cleanup process is outlined. Supplemental sections on events, special focuses, publication listings, etc. are also included.

  5. PETC Review, Issue 2, September 1990

    SciTech Connect (OSTI)

    Blaustein, B.; Reiss, J.; Riehle, B.; Brown, J.; Hammer, D.

    1990-09-01

    This issue of PETC Review provides short discussion on research programs in (1) combustion technology, (2) flue gas cleanup technology, (3) coal science and chemistry. An overview of the PETC New Fuels Evaluation Facility is given, the US Clean Coal Technology Program's activities in Poland are discussed, and the NOXSO flue gas cleanup process is outlined. Supplemental sections on events, special focuses, publication listings, etc. are also included.

  6. Sandia National Laboratories: LabNews Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LabNews Issues 2016 $_SerializerTool.serialize($alt) September 01, 2016 Blowing bubbles to catch CO2; X-ray vision; When hurricanes take aim; Sen. Heinrich hosts 2016 Energy Summit; Encouraging STEM success for women of color; Clean leap; Trailblazer; Summer institute introduces Sandia interns to NW work; Friction, Fatigue, and Failure; Let it rain-Sandia's clean water stewards; Remember the TITANS Download (PDF) $_SerializerTool.serialize($alt) August 18, 2016 Beating bitcoin bad guys; Strong

  7. PETC Review, Issue 3, March 1991

    SciTech Connect (OSTI)

    Blaustein, B.; Reiss, J.; Robotti, S.; Brown, J.; Carter, C.; Evans, E.; Hammer, D.

    1991-03-01

    This issue of PETC Review presents brief discussion of the status of two DOE research program: (1)Coal Liquefaction and (2)Low-Cost Retrofit Technologies for Reducing SO{sub 2}, NO{sub x}, and Particulates as part of the Clean Coal Technology Program. Air Toxics and the 1990 Clean Air Act are also discussed with respect to Environmental Protection Agency regulations. Supplemental sections on events, special focuses, publication listing, etc. are also included.

  8. Regulatory issues for deep borehole plutonium disposition

    SciTech Connect (OSTI)

    Halsey, W.G.

    1995-03-01

    As a result of recent changes throughout the world, a substantial inventory of excess separated plutonium is expected to result from dismantlement of US nuclear weapons. The safe and secure management and eventual disposition of this plutonium, and of a similar inventory in Russia, is a high priority. A variety of options (both interim and permanent) are under consideration to manage this material. The permanent solutions can be categorized into two broad groups: direct disposal and utilization. The deep borehole disposition concept involves placing excess plutonium deep into old stable rock formations with little free water present. Issues of concern include the regulatory, statutory and policy status of such a facility, the availability of sites with desirable characteristics and the technologies required for drilling deep holes, characterizing them, emplacing excess plutonium and sealing the holes. This white paper discusses the regulatory issues. Regulatory issues concerning construction, operation and decommissioning of the surface facility do not appear to be controversial, with existing regulations providing adequate coverage. It is in the areas of siting, licensing and long term environmental protection that current regulations may be inappropriate. This is because many current regulations are by intent or by default specific to waste forms, facilities or missions significantly different from deep borehole disposition of excess weapons usable fissile material. It is expected that custom regulations can be evolved in the context of this mission.

  9. Final Information Quality Bulletin for Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review PDF icon Final Information ...

  10. SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED

    Office of Legacy Management (LM)

    SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED , ?4~0180N SctuAnr P. 0. 00x *a STATION F New YORK, N. Y. IN RLPLY RCFSRTO EID?f A- 43 MS ~-7405 eng-8 ". Subject: Contract No.H-7405 eng-8 with Metal Hydrides Incorporated. MEMORAhDUM to the Files. 1. Reference is made to basi.c communication dated 27 September 1945, Symbol No. EIDM 1%-30-b, requesting certain information with respect to the subject contract. 2. Reference pars,?-raph a. The Government committed to restore Contractor's plant

  11. Hanford_FinalReport_20140130

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Hanford workers begin cleaning out historic McCluskey Room Hanford workers begin cleaning out historic McCluskey Room Addthis Description Workers have entered one of the most hazardous rooms at the Hanford Site in Washington state to begin final cleanup of a room that became known to workers over the years by the name of a worker injured there in a Cold War-era accident. The first reentry on Monday, September 8, 2014, consisted mostly surveying the room. More information:

  12. Field practice internship final report

    SciTech Connect (OSTI)

    Foster, T.

    1994-05-01

    This field practice internship final report gives an overview of the field practice, which was completed at the Oak Ridge Y-12 Plant, Martin Marietta Energy Systems, Inc., Environmental Management Department, Oak Ridge, Tennessee. The field practice focused on the completion of the Superfund Amendments and Reauthorization Act (SARA) Title III, Emergency Planning and Community Right-to-Know Act Section 312, Tier II Report. The field practice internship was conducted on a full-time basis between December 13, 1993 through February 18, 1994. Sheila Poligone, Emergency Planning and Community Right-to-Know Act (EPCRA) Coordinator served as the field practice preceptor.

  13. Hydroprocessing SRC. Final technical report

    SciTech Connect (OSTI)

    Bronfenbrenner, J.C.; Garg, D.; Harris, C.F.; Znaimer, S.

    1983-09-01

    Catalyst activity and aging rate were studied in ICRC's process development unit (PDU) and at the Wilsonville Advanced Coal Liquefaction Facility under SRC-I Demonstration Plant hydroprocessing conditions. Similar studies using both high- and low-conversion modes were conducted by The Lummus Company. The studies determined variations in SRC conversion, hydrocarbon gas production, hydrogen consumption, and heteroatom removal. Samples of spent catalyst were analyzed to ascertain the reasons for catalyst deactivation. Finally, the ICRC PDU hydroprocessing results were compared with those generated at Lummus and Wilsonville pilot plants.

  14. Microsoft Word - REPORT.13.final

    Office of Scientific and Technical Information (OSTI)

    Grantee The George Washington University Department of Chemistry 725 21 st St., NW Corcoran Hall Washington, DC 20052 Grant Number DE-FG02-02ER15366 Project Title Interface Induced Carbonate Mineralization: A Fundamental Geochemical Process Relevant to Carbon Sequestration P/I Dr. H. Henry Teng 202-994-0112 hteng@gwu.edu Co-PI Dr. Huifang Xu Dept. Geoscience University of Wisconsin-Madison 1215 W Dayton St Madison, WI 53706 FINAL REPORT Background Vast majority of literature work concludes that

  15. Virtualized Network Control. Final Report

    SciTech Connect (OSTI)

    Ghani, Nasir

    2013-02-01

    This document is the final report for the Virtualized Network Control (VNC) project, which was funded by the United States Department of Energy (DOE) Office of Science. This project was also informally referred to as Advanced Resource Computation for Hybrid Service and TOpology NEtworks (ARCHSTONE). This report provides a summary of the project's activities, tasks, deliverable, and accomplishments. It also provides a summary of the documents, software, and presentations generated as part of this projects activities. Namely, the Appendix contains an archive of the deliverables, documents, and presentations generated a part of this project.

  16. [Experimental nuclear physics]. Final report

    SciTech Connect (OSTI)

    1991-04-01

    This is the final report of the Nuclear Physics Laboratory of the University of Washington on work supported in part by US Department of Energy contract DE-AC06-81ER40048. It contains chapters on giant dipole resonances in excited nuclei, nucleus-nucleus reactions, astrophysics, polarization in nuclear reactions, fundamental symmetries and interactions, accelerator mass spectrometry (AMS), ultra-relativistic heavy ions, medium energy reactions, work by external users, instrumentation, accelerators and ion sources, and computer systems. An appendix lists Laboratory personnel, a Ph. D. degree granted in the 1990-1991 academic year, and publications. Refs., 41 figs., 7 tabs.

  17. Report of the final configuration of the Johnson Noise Thermometry System

    SciTech Connect (OSTI)

    Britton, Jr., Charles L.; Ezell, N. Dianne Bull; Roberts, Michael

    2014-02-01

    This document is a report on the final box and software configuration of the Johnson Noise Thermometry System being developed at ORNL. Much of this has been reported previously so that this report will be a systems-level summary of those reports, In addition we will describe some of the issues encountered during development.

  18. Final EIS for Champlain Hudson Power Express Transmission Project Now Available

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has prepared a Final Environmental Impact Statement (EIS) to evaluate the potential environmental impacts in the United States of the proposed action to issue a Presidential permit to the Applicant, Champlain Hudson Power Express, Inc. (CHPEI), and the range of reasonable alternatives.

  19. High energy physics research. Final report, October 1, 1969--December 31, 1990

    SciTech Connect (OSTI)

    1995-05-01

    The goal of this research was to understand the fundamental constituents of matter and their interactions. First, a brief history of the high energy research at Princeton University is presented. Next, the extensive research covered in this 21 year period is summarized. Finally, a list of all publications issued during this period is presented.

  20. FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2011 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING December 7, 2011 Richland, WA Topics in this Meeting Summary Welcome and Introductions ......................................................................................................................... 1 Issue Manager Table Update ........................................................................................................................ 2 PW-1, 3, 6 and CW-5 ROD (Joint with PIC)

  1. Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM celebrated a milestone recently when DOE issued the long-awaited Final Environmental Impact Statement (EIS) for the Disposal of Greater-Than-Class-C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste.

  2. 2014-04-07 Issuance: Energy Conservation Standards for Certain Consumer Products; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding the definitions for "through-the-wall central air conditioner" and "through-the-wall central air conditioning heat pump" that were established in section 5 of the American Energy Manufacturing Technical Corrections Act, as issued by the Assistant Secretary on April 7, 2014.

  3. Across the Pond Newsletter Issue 1

    Office of Environmental Management (EM)

    Templates Acquisition Templates On September 28, 2010, four draft acquisition templates (Competitive Range Exclusion Letter, Competitive Range Inclusion Letter - Written Discussions, Competitive Range Inclusion Letter - Written and Oral Discussions, and Proposal Receipt Checklist) were distributed for Procurement Director (PD) and Head of Contracting Activity (HCA) review and comment. All comments received were considered and changes were made as appropriate. The final versions of the four

  4. Final report for NIF chamber dynamics studies, final rept (May 1997), Subcontract No. B291847

    SciTech Connect (OSTI)

    Peterson, P.F.; Jin, H.; Scott, J.M.

    1997-07-01

    The National Ignition Facility (NIF), a 1.8 MJ, 192 laser beam facility, will have anticipated fusion yields of up to 20 MJ from D-T pellets encased in a gold hohlraum target. The energy emitted from the target in the form of x rays, neutrons, target debris kinetic energy, and target shrapnel will be contained in a 5 m. radius spherical target chamber. Various diagnostics will be stationed around the target at varying distances from the target. During each shot, the target will emit x rays that will vaporize nearby target facing surfaces including those of the diagnostics, the target positioner, and other chamber structures. This ablated vapor will be transported throughout the chamber, and will eventually condense and deposit on surfaces in the chamber, including the final optics debris shields. The research at the University of California at Berkeley relates primarily to the NIF chamber dynamics. The key design issues are the ablation of the chamber structures, transport of the vapor through the chamber and the condensation or deposition processes of those vaporized materials. An understanding of these processes is essential in developing a concept for protecting the final optics debris shields from an excessive coating (> 10 {Angstrom}) of target debris and ablated material, thereby prolonging their lifetime between change- outs. At Berkeley, we have studied the physical issues of the ablation process and the effects of varying materials, the condensation process of the vaporized material, and design schemes that can lower the threat posed to the debris shields by these processes. In addition to the work described briefly above, we performed extensive analysis of the target-chamber thermal response to in- chamber CO{sub 2} Cleaning and of work performed to model the behavior of silica vapor. The work completed this year has been published in several papers and a dissertation [1-6]. This report provides a summary of the work completed this year, as well as copies

  5. PARC Periodical | Volume 7, Issue 2 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 2 December 7, 2015 PARC Periodical | Volume 7, Issue 2 VIEW ARTICLE HERE

  6. PARC Periodical | Volume 7, Issue 3 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 3 February 16, 2016 PARC Periodical | Volume 7, Issue 3 VIEW ARTICLE HERE

  7. Ethanol Production, Distribution, and Use: Discussions on Key Issues (Presentation)

    SciTech Connect (OSTI)

    Harrow, G.

    2008-05-14

    From production to the environment, presentation discusses issues surrounding ethanol as a transportation fuel.

  8. Innovative approaches to inertial confinement fusion reactors: Final report

    SciTech Connect (OSTI)

    Bourque, R.F.; Schultz, K.R.

    1986-11-01

    Three areas of innovative approaches to inertial confinement fusion (ICF) reactor design are given. First, issues pertaining to the Cascade reactor concept are discussed. Then, several innovative concepts are presented which attempt to directly recover the blast energy from a fusion target. Finally, the Turbostar concept for direct recovery of that energy is evaluated. The Cascade issues discussed are combustion of the carbon granules in the event of air ingress, the use of alternate granule materials, and the effect of changes in carbon flow on details of the heat exchanger. Carbon combustion turns out to be a minor problem. Four ICF innovative concepts were considered: a turbine with ablating surfaces, a liquid piston system, a wave generator, and a resonating pump. In the final analysis, none show any real promise. The Turbostar concept of direct recovery is a very interesting idea and appeared technically viable. However, it shows no efficiency gain or any decrease in capital cost compared to reactors with conventional thermal conversion systems. Attempts to improve it by placing a close-in lithium sphere around the target to increase gas generation increased efficiency only slightly. It is concluded that these direct conversion techniques require thermalization of the x-ray and debris energy, and are Carnot limited. They therefore offer no advantage over existing and proposed methods of thermal energy conversion or direct electrical conversion.

  9. Proliferation resistance: issues, initiatives and evaluation

    SciTech Connect (OSTI)

    Pilat, Joseph F

    2009-01-01

    The vision of a nuclear renaissance has highlighted the issue of proliferation resistance. The prospects for a dramatic growth in nuclear power may depend on the effectiveness of, and the resources devoted to, plans to develop and implement technologies and approaches that strengthen proliferation resistance. The GenIV International Forum (GIF) and others have devoted attention and resources to proliferation resistance. However, the hope of finding a way to make the peaceful uses of nuclear energy resistant to proliferation has reappeared again and again in the history of nuclear power with little practical consequence. The concept of proliferation resistance has usually focused on intrinsic (technological) as opposed to extrinsic (institutional) factors. However, if there are benefits that may yet be realized from reactors and other facilities designed to minimize proliferation risks, it is their coupling with effective safeguards and other nonproliferation measures that likely will be critical. Proliferation resistance has also traditionally been applied only to state threats. Although there are no technologies that can wholly eliminate the risk of proliferation by a determined state, technology can play a limited role in reducing state threats and perhaps in eliminating many non-state threats. These and other issues are not academic. They affect efforts to evaluate proliferation resistance, including the methodology developed by GIF's Proliferation Resistance and Physical Protection (PR&PP) Working Group as well as the proliferation resistance initiatives that are being pursued or may be developed in the future. This paper will offer a new framework for thinking about proliferation resistance issues, including the ways the output of the methodology could be developed to inform the decisions that states, the International Atomic Energy (IAEA) and others will have to make in order to fully realize the promise of a nuclear renaissance.

  10. Outage managment and health physics issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2008-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles include: Outage optimization initiatives, by George B. Beam, AREVA NP, Inc.; New plant based on excellent track records, by Jim Scarola, Progress Energy; Meeting customer needs and providing environmental benefits, by Peter S. Hastings, Duke Energy; Plants with 3-D design, by Jack A. Bailey, Tennessee Valley Authority; and Highest quality with exceptional planning, by Jason A. Walls, Duke Energy. Industry innovation articles include: Integrated exposure reduction plan, by Ed Wolfe, Exelon; Performance-based radiation worker training, by Joe Giuffre and Timothy Vriezerma, American Electric Power.

  11. ELECTROMIGRATION ISSUES IN HIGH CURRENT HORN.

    SciTech Connect (OSTI)

    ZHANG, S.Y.; BELLAVIA, S.; SANDBERG, J.; ET AL.

    2005-05-16

    The secondary particle focusing horn for the AGS neutrino experiment proposal is a high current and high current density device. The peak current of horn is 300 kA. At the smallest area of horn, the current density is near 8 kA/mm{sup 2}. At very high current density, a few kA/mm{sup 2}, the electromigration phenomena will occur. Momentum transfer between electrons and metal atoms at high current density causes electromigration. The reliability and lifetime of focusing horn can be severely reduced by electromigration. In this paper, we discuss issues such as device reliability model, incubation time of electromigration, and lifetime of horn.

  12. CHAPS: status of issues and action items

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2007 CHAPS: status of issues and action items. Items to watch are shown in bold. 1. Our most recent 'off-line' conference call was on March 30, with Yin-Nan, Liz, John J. Betsy, and John H. Details of AMS plumbing were discussed. 2. Status of CVI: a. It has been installed and test flown, 3/14 & 3/16. b. We are working on an instability in one of the flow meters (feedback with the zero-air regulator?) c. Will be flown again with nephs and psaps, and again with AMS d. See full status of

  13. PETC Review, Issue 4, Fall 1991

    SciTech Connect (OSTI)

    Blaustein, B.D.; Reiss, J.; Tarquinio, M.A.; Brown, J.; Evans, E.

    1991-12-31

    In this issue of PETC Review, short discussion is given on the following topics: (1) ``Combustion 2000``--a low-emission boiler system coupled to a high-performance power system; (2) ``Liquid Transportation Fuels from Coal, Part 2: Indirect Liquefaction``--outline research program; (3) ``A Computer Expert System to Reduce Power Plant Emissions``--a system being developed to predict the economic, operational, and environmental benefits of using commercially achievable cleaned coals; (4) ``PETC`s Flow Analysis Laboratory Assists Artificial Heart Research``--PETC equipment used to study the flow of blood in artificial hearts. Supplemental sections on events, special focuses, calendars, publication lists, etc. are also included.

  14. Natural gas 1994: Issues and trends

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This report provides an overview of the natural gas industry in 1993 and early 1994 (Chapter 1), focusing on the overall ability to deliver gas under the new regulatory mandates of Order 636. In addition, the report highlights a range of issues affecting the industry, including: restructuring under Order 636 (Chapter 2); adjustments in natural gas contracting (Chapter 3); increased use of underground storage (Chapter 4); effects of the new market on the financial performance of the industry (Chapter 5); continued impacts of major regulatory and legislative changes on the natural gas market (Appendix A).

  15. PETC Review, Issue 4, Fall 1991

    SciTech Connect (OSTI)

    Blaustein, B D; Reiss, J; Tarquinio, M A; Brown, J; Evans, E

    1991-10-01

    In this issue of PETC Review, short discussion is given on the following topics: (1) Combustion 2000''--a low-emission boiler system coupled to a high-performance power system; (2) Liquid Transportation Fuels from Coal, Part 2: Indirect Liquefaction''--outline research program; (3) A Computer Expert System to Reduce Power Plant Emissions''--a system being developed to predict the economic, operational, and environmental benefits of using commercially achievable cleaned coals; (4) PETC's Flow Analysis Laboratory Assists Artificial Heart Research''--PETC equipment used to study the flow of blood in artificial hearts. Supplemental sections on events, special focuses, calendars, publication lists, etc. are also included.

  16. Welcome to the First Issue of AlumniLink

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Welcome to the Cultural Resources Newsletter Welcome to the Cultural Resources Newsletter Welcome to the Cultural Resources Newsletter (446.29 KB) More Documents & Publications Secretary Directs FPO to Prepare Strategic Plan Strategic Plan Submitted to the Secretary Microsoft Word - August06.doc

    Welcome to the First Issue of AlumniLink Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:September 2015 all issues All Issues » submit Welcome to the First Issue

  17. GDB - Human Genome Database final report

    SciTech Connect (OSTI)

    Talbot, C. Conover, Jr.

    2002-01-08

    This is the DOE final report for the GDB, Human Genome Database, project at the Johns Hopkins University.

  18. Microsoft Word - FINAL_TECHNICAL_REPORT.doc

    Office of Scientific and Technical Information (OSTI)

    ......... 27 Figure 16 Comparison between simulation and experimental results: (a) Top view of final simulated inclusion locations. ...

  19. Final Uranium Leasing Program Programmatic Environmental Impact...

    Energy Savers [EERE]

    Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Uranium Leasing ...

  20. Fort Polk EEAP. Final report

    SciTech Connect (OSTI)

    Busch, R.D.; Scheuch, K.E.; Shishman, T.T.

    1986-07-17

    This Final Presentation provides a summary of the work done under Increments A, B, E, and G of the Energy Engineering Analysis Program (EEAP) for Fort Polk Louisiana. The work was accomplished under Contract DACA63-80-C-0166 plus modifications with the Fort Worth District, Corps of Engineers. The vast majority of consumed energy at Fort Polk consists of electricity and natural gas. In FY75, Fort Polk used 48,399,000 kWh of electricity at a cost of $600,000. During that same period, 782,637 MCF of natural gas was purchased for $484,000. The total FY75 energy use was 1,368,327 MBtu.

  1. Strategic Asia 2002 Final Report

    SciTech Connect (OSTI)

    Richard Ellings; Aaron Friedberg; Michael Wills

    2002-09-01

    The Strategic Asia Program made considerable progress over the course of 2002--the program's first year with support from the Department of Energy--and completed all its tasks on schedule and within budget. Following a planning meeting in Washington in February 2002, a team of leading specialists wrote a series of original assessments regarding the impact of September 11 on the strategic environment in Asia, examining how perceptions and strategies of countries in the region changed following the terrorist attacks. The final products, Strategic Asia 2002-03: Asian Aftershocks and its accompanying executive summary, were published in September 2002. The program's research findings (some of which are summarized) were presented to policymakers in Washington and elsewhere throughout the year, and almost 2,000 copies of the book had been distributed by mid-2003.

  2. HTS thin films: Passive microwave components and systems integration issues

    SciTech Connect (OSTI)

    Miranda, F.A.; Chorey, C.M.; Bhasin, K.B.

    1994-12-31

    The excellent microwave properties of the High-Temperature-Superconductors (HTS) have been amply demonstrated in the laboratory by techniques such as resonant cavity, power transmission and microstrip resonator measurements. The low loss and high Q passive structures made possible with HTS, present attractive options for applications in commercial, military and space-based systems. However, to readily insert HTS into these systems improvement is needed in such areas as repeatability in the deposition and processing of the HTS films, metal-contact formation, wire bonding, and overall film endurance to fabrication and assembly procedures. In this paper we present data compiled in our lab which illustrate many of the problems associated with these issues. Much of this data were obtained in the production of a space qualified hybrid receiver-downconverter module for the Naval Research Laboratory`s High Temperature Superconductivity Space Experiment II (HTSSE-II). Examples of variations observed in starting films and finished circuits will be presented. It is shown that under identical processing the properties of the HTS films can degrade to varying extents. Finally, we present data on ohmic contacts and factors affecting their adhesion to HTS films, strength of wire bonds made to such contacts, and aging effects.

  3. Cutting-edge issues of core-collapse supernova theory

    SciTech Connect (OSTI)

    Kotake, Kei; Nakamura, Ko; Kuroda, Takami; Takiwaki, Tomoya

    2014-05-02

    Based on multi-dimensional neutrino-radiation hydrodynamic simulations, we report several cutting-edge issues about the long-veiled explosion mechanism of core-collapse supernovae (CCSNe). In this contribution, we pay particular attention to whether three-dimensional (3D) hydrodynamics and/or general relativity (GR) would or would not help the onset of explosions. By performing 3D simulations with spectral neutrino transport, we show that it is more difficult to obtain an explosion in 3D than in 2D. In addition, our results from the first generation of full general relativistic 3D simulations including approximate neutrino transport indicate that GR can foster the onset of neutrino-driven explosions. Based on our recent parametric studies using a light-bulb scheme, we discuss impacts of nuclear energy deposition behind the supernova shock and stellar rotation on the neutrino-driven mechanism, both of which have yet to be included in the self-consistent 3D supernova models. Finally we give an outlook with a summary of the most urgent tasks to extract the information about the explosion mechanisms from multi-messenger CCSN observables.

  4. CCSTF - Final Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CCSTF - Final Report CCSTF - Final Report Carbon Capture and Storage Task Force - Final Report (2.08 MB) More Documents & Publications Before the Subcommittee on Energy -- House Science, Space, and Technology Committee Before the House Energy and Commerce Subcommittee on Oversight and Investigations CCS Task Force - Executive Summary

  5. GaN: Defect and Device Issues

    SciTech Connect (OSTI)

    Pearton, S.J.; Ren, F.; Shul, R.J.; Zolper, J.C.

    1998-11-09

    The role of extended and point defects, and key impurities such as C, O and H, on the electrical and optical properties of GaN is reviewed. Recent progress in the development of high reliability contacts, thermal processing, dry and wet etching techniques, implantation doping and isolation and gate insulator technology is detailed. Finally, the performance of GaN-based electronic and photonic devices such as field effect transistors, UV detectors, laser diodes and light-emitting diodes is covered, along with the influence of process-induced or grown-in defects and impurities on the device physics.

  6. Dust Combustion Safety Issues for Fusion Applications

    SciTech Connect (OSTI)

    L. C. Cadwallader

    2003-05-01

    This report summarizes the results of a safety research task to identify the safety issues and phenomenology of metallic dust fires and explosions that are postulated for fusion experiments. There are a variety of metal dusts that are created by plasma erosion and disruptions within the plasma chamber, as well as normal industrial dusts generated in the more conventional equipment in the balance of plant. For fusion, in-vessel dusts are generally mixtures of several elements; that is, the constituent elements in alloys and the variety of elements used for in-vessel materials. For example, in-vessel dust could be composed of beryllium from a first wall coating, tungsten from a divertor plate, copper from a plasma heating antenna or diagnostic, and perhaps some iron and chromium from the steel vessel wall or titanium and vanadium from the vessel wall. Each of these elements has its own unique combustion characteristics, and mixtures of elements must be evaluated for the mixtures combustion properties. Issues of particle size, dust temperature, and presence of other combustible materials (i.e., deuterium and tritium) also affect combustion in air. Combustion in other gases has also been investigated to determine if there are safety concerns with inert atmospheres, such as nitrogen. Several coolants have also been reviewed to determine if coolant breach into the plasma chamber would enhance the combustion threat; for example, in-vessel steam from a water coolant breach will react with metal dust. The results of this review are presented here.

  7. Plant maintenance and advanced reactors issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

  8. Environmental issues related to biomass: An overview

    SciTech Connect (OSTI)

    Hughes, M.; Ranney, J.W.

    1993-12-31

    Now that public attention has grown increasingly focused on environmentalism and climate change, the commercial use of biomass could greatly accelerate. Renewable feedstocks like biomass can provide better environmentally balanced sources of energy and other nonfood products than fossil fuels. The future of biomass is uncertain, however, because public attention focuses on both its potential and its challenges. This paper is divided into five sections. Section 2 briefly addresses economic environmental issues. The extent to which externalities are accounted for in the market price of fuels plays a significant role in determining both the ultimate size of biofuel markets and the extent of the environmental benefits of feedstock cultivation and conversion processes. Sections 3 and 4 catalog the main hazards and benefits that are likely to arise in the large-scale commercialization of biomass fuel and note where the major uncertainties lay. Environmental issues arise with the cultivation of each feedstock and with each step in the process of its conversion to fuel. Feedstocks are discussed in Section 3 in terms of three main groups: wastes, energy crops, and traditional agricultural crops. In Section 4, conversion processes are also divided into three groups, on the basis of the end energy carrier: gas, liquid, and solid and electricity. Section 5 provides a conclusion and summary.

  9. Final Report for the ZERT Project: Basic Science of Retention Issues, Risk Assessment & Measurement, Monitoring and Verification for Geologic Sequestration

    SciTech Connect (OSTI)

    Spangler, Lee; Cunningham, Alfred; Lageson, David; Melick, Jesse; Gardner, Mike; Dobeck, Laura; Repasky, Kevin; Shaw, Joseph; Bajura, Richard; McGrail, B Peter; Oldenburg, Curtis M; Wagoner, Jeff; Pawar, Rajesh

    2011-03-31

    ZERT has made major contributions to five main areas of sequestration science: improvement of computational tools; measurement and monitoring techniques to verify storage and track migration of CO{sub 2}; development of a comprehensive performance and risk assessment framework; fundamental geophysical, geochemical and hydrological investigations of CO{sub 2} storage; and investigate innovative, bio-based mitigation strategies.

  10. Energy Department Issues Green Building Certification System Final Rule to Support Increased Energy Measurement and Efficient Building Design

    Broader source: Energy.gov [DOE]

    Supporting the Obama Administration’s goal to reduce carbon emissions and protect the environment, the Energy Department is pursuing a suite of initiatives to strengthen federal energy management through increased focus on measurement of energy use in federal buildings and energy efficient building design.

  11. Personnel supply and demand issues in the nuclear power industry. Final report of the Nuclear Manpower Study Committee

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The anticipated personnel needs of the nuclear power industry have varied widely in recent years, in response to both increasing regulatory requirements and declining orders for new plants. Recent employment patterns in the nuclear energy field, with their fluctuations, resemble those of defense industries more than those traditionally associated with electric utilities. Reactions to the accident at Three Mile Island Unit 2 by industry and regulators have increased the demand for trained and experienced personnel, causing salaries to rise. Industry, for example, has established several advisory organizations like the Institute for Nuclear Power Operations (INPO). At the same time, the US Nuclear Regulatory Commission (NRC) has imposed many new construction and operating requirements in an effort to take advantage of lessons learned from the Three Mile Island incident and to respond to the perceived public interest in better regulation of nuclear power. Thus, at present, utilities, architect-engineer firms, reactor vendors, and organizations in the nuclear development community have heavy workloads.

  12. 2009 ECR FINAL REPORT 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 PDF icon 2009 ECR Report More Documents & Publications test Final ECR...

  13. IRIS Final Technical Progress Report

    SciTech Connect (OSTI)

    M. D. Carelli

    2003-11-03

    OAK-B135 This NERI project, originally started as the Secure Transportable Autonomous Light Water Reactor (STAR-LW) and currently known as the International Reactor Innovative and Secure (IRIS) project, had the objective of investigating a novel type of water-cooled reactor to satisfy the Generation IV goals: fuel cycle sustainability, enhanced reliability and safety, and improved economics. The research objectives over the three-year (1999-2002) program were as follows: First year: Assess various design alternatives and establish main characteristics of a point design; Second year: Perform feasibility and engineering assessment of the selected design solutions; Third year: Complete reactor design and performance evaluation, including cost assessment These objectives were fully attained and actually they served to launch IRIS as a full fledged project for eventual commercial deployment. The program did not terminate in 2002 at the end of the NERI program, and has just entered in its fifth year. This has been made possible by the IRIS project participants which have grown from the original four member, two-countries team to the current twenty members, nine countries consortium. All the consortium members work under their own funding and it is estimated that the value of their in-kind contributions over the life of the project has been of the order of $30M. Currently, approximately 100 people worldwide are involved in the project. A very important constituency of the IRIS project is the academia: 7 universities from four countries are members of the consortium and five more US universities are associated via parallel NERI programs. To date, 97 students have worked or are working on IRIS; 59 IRIS-related graduate theses have been prepared or are in preparation, and 41 of these students have already graduated with M.S. (33) or Ph.D. (8) degrees. This ''final'' report (final only as far as the NERI program is concerned) summarizes the work performed in the first four

  14. Tritium Issues in Next Step Devices

    SciTech Connect (OSTI)

    C.H. Skinner; G. Federici

    2001-09-05

    Tritium issues will play a central role in the performance and operation of next-step deuterium-tritium (DT) burning plasma tokamaks and the safety aspects associated with tritium will attract intense public scrutiny. The orders-of-magnitude increase in duty cycle and stored energy will be a much larger change than the increase in plasma performance necessary to achieve high fusion gain and ignition. Erosion of plasma-facing components will scale up with the pulse length from being barely measurable on existing machines to centimeter scale. Magnetic Fusion Energy (MFE) devices with carbon plasma-facing components will accumulate tritium by co-deposition with the eroded carbon and this will strongly constrain plasma operations. We report on a novel laser-based method to remove co-deposited tritium from carbon plasma-facing components in tokamaks. A major fraction of the tritium trapped in a co-deposited layer during the deuterium-tritium (DT) campaign on the Tokamak Fusion Test Reactor (TFTR) was released by heating with a scanning laser beam. This technique offers the potential for tritium removal in a next-step DT device without the use of oxidation and the associated deconditioning of the plasma-facing surfaces and expense of processing large quantities of tritium oxide. The operational lifetime of alternative materials such as tungsten has significant uncertainties due to melt layer loss during disruptions. Production of dust and flakes will need careful monitoring and minimization, and control and accountancy of the tritium inventory will be critical issues. Many of the tritium issues in Inertial Fusion Energy (IFE) are similar to MFE, but some, for example those associated with the target factory, are unique to IFE. The plasma-edge region in a tokamak has greater complexity than the core due to lack of poloidal symmetry and nonlinear feedback between the plasma and wall. Sparse diagnostic coverage and low dedicated experimental run time has hampered the

  15. Estimating Fuel Cycle Externalities: Analytical Methods and Issues, Report 2

    SciTech Connect (OSTI)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1994-07-01

    The activities that produce electric power typically range from extracting and transporting a fuel, to its conversion into electric power, and finally to the disposition of residual by-products. This chain of activities is called a fuel cycle. A fuel cycle has emissions and other effects that result in unintended consequences. When these consequences affect third parties (i.e., those other than the producers and consumers of the fuel-cycle activity) in a way that is not reflected in the price of electricity, they are termed ''hidden'' social costs or externalities. They are the economic value of environmental, health and any other impacts, that the price of electricity does not reflect. How do you estimate the externalities of fuel cycles? Our previous report describes a methodological framework for doing so--called the damage function approach. This approach consists of five steps: (1) characterize the most important fuel cycle activities and their discharges, where importance is based on the expected magnitude of their externalities, (2) estimate the changes in pollutant concentrations or other effects of those activities, by modeling the dispersion and transformation of each pollutant, (3) calculate the impacts on ecosystems, human health, and any other resources of value (such as man-made structures), (4) translate the estimates of impacts into economic terms to estimate damages and benefits, and (5) assess the extent to which these damages and benefits are externalities, not reflected in the price of electricity. Each step requires a different set of equations, models and analysis. Analysts generally believe this to be the best approach for estimating externalities, but it has hardly been used! The reason is that it requires considerable analysis and calculation, and to this point in time, the necessary equations and models have not been assembled. Equally important, the process of identifying and estimating externalities leads to a number of complex issues

  16. Outage management and health physics issue, 2009

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles include the following: Planning and scheduling to minimize refueling outage, by Pat McKenna, AmerenUE; Prioritizing safety, quality and schedule, by Tom Sharkey, Dominion; Benchmarking to high standards, by Margie Jepson, Energy Nuclear; Benchmarking against U.S. standards, by Magnox North, United Kingdom; Enabling suppliers for new build activity, by Marcus Harrington, GE Hitachi Nuclear Energy; Identifying, cultivating and qualifying suppliers, by Thomas E. Silva, AREVA NP; Creating new U.S. jobs, by Francois Martineau, Areva NP. Industry innovation articles include: MSL Acoustic source load reduction, by Amir Shahkarami, Exelon Nuclear; Dual Methodology NDE of CRDM nozzles, by Michael Stark, Dominion Nuclear; and Electronic circuit board testing, by James Amundsen, FirstEnergy Nuclear Operating Company. The plant profile article is titled The future is now, by Julia Milstead, Progress Energy Service Company, LLC.

  17. Issues and opportunities in exotic hadrons

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Briceno, Raul A.; Cohen, Thomas D.; Coito, S.; Dudek, Jozef J.; Eichten, E.; Fischer, C. S.; Fritsch, M.; Gradl, W.; Jackura, A.; Kornicer, M.; et al

    2016-04-01

    The last few years have been witness to a proliferation of new results concerning heavy exotic hadrons. Experimentally, many new signals have been discovered that could be pointing towards the existence of tetraquarks, pentaquarks, and other exotic configurations of quarks and gluons. Theoretically, advances in lattice field theory techniques place us at the cusp of understanding complex coupled-channel phenomena, modelling grows more sophisticated, and effective field theories are being applied to an ever greater range of situations. Consequently, it is thus an opportune time to evaluate the status of the field. In the following, a series of high priority experimentalmore » and theoretical issues concerning heavy exotic hadrons is presented.« less

  18. Product and Service directory - 2007 issue

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2006-11-15

    The focus of the November-December issue each year is to provide an up to date product and services directory. The Directory is a source of informaiton on resources for over 3,000 products and services related to the nuclear power industry. The information included was submitted by approximately 300 suppliers worldwide during October-November 2006. The section includes listings of available current products and services with the names of the related supliers. Items listed in the Directory are related to the nuclear power industry only. Therefore the words 'nuclear' or 'nuclear power' have been dropped from the indexing terms that aid in organizing the information presented. Each suppliers listing in the suppliers section includes complete contact information. The Corporate Capabiliites section lists products and services of organizations in one central location.

  19. Product and Service directory - 2005 issue

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2004-11-15

    The focus of the November-December issue each year is to provide an up to date product and services directory. The Directory is a source of informaiton on resources for over 3,000 products and services related to the nuclear power industry. The information included was submitted by approximately 300 suppliers worldwide during October-November 2004. The section includes listings of available current products and services with the names of the related supliers. Items listed in the Directory are related to the nuclear power industry only. Therefore the words 'nuclear' or 'nuclear power' have been dropped from the indexing terms that aid in organizing the information presented. Each suppliers listing in the suppliers section includes complete contact information. The Corporate Capabiliites section lists products and services of organizations in one central location.

  20. Product and Service directory - 2008 issue

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2007-11-15

    The focus of the November-December issue each year is to provide an up to date product and services directory. The Directory is a source of informaiton on resources for over 3,000 products and services related to the nuclear power industry. The information included was submitted by approximately 300 suppliers worldwide during October-November 2007. The section includes listings of available current products and services with the names of the related supliers. Items listed in the Directory are related to the nuclear power industry only. Therefore the words 'nuclear' or 'nuclear power' have been dropped from the indexing terms that aid in organizing the information presented. Each suppliers listing in the suppliers section includes complete contact information. The Corporate Capabiliites section lists products and services of organizations in one central location.