Powered by Deep Web Technologies
Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

A Generic Forecast Verification Framework for Administrative Purposes  

Science Conference Proceedings (OSTI)

There are numerous reasons for calculating forecast verification scores, and considerable attention has been given to designing and analyzing the properties of scores that can be used for scientific purposes. Much less attention has been given to ...

Simon J. Mason; Andreas P. Weigel

2009-01-01T23:59:59.000Z

2

INTERVIEWER:  

U.S. Energy Information Administration (EIA) Indexed Site

INTERVIEWER: INTERVIEWER: 1990 PLEASE CALL DIRECTORY ASSISTANCE TO GET THE TELEPHONE NUMBER FOR THE HOUSEHOLD LISTED ON THE ADDRESS LABEL R90E-06 120790 a Telephone f ) - D Telephone number is UNLISTED a NO telephone NUMBER listed for this name at this address D OTHER: Please describe result below: 1991 RTECS Operations Manual/Appendix A-1 Department of Energy Washington, DC 20585 January 1991 Dear Resident: The U.S. Department of Energy (DOE) Is committed to developing a comprehensive National Energy Strategy. One of the ways DOE is attempting to do this is by learning about your vehicles' energy use. But, your help is needed. An interviewer will telephone you shortly to ask questions about your motor vehicles. The interviewer is employed by the Response Analysis Corporation of Princeton, New Jersey, who is under

3

General-Purpose Heat Source Safety Verification Test series: SVT-7 through SVT-10  

SciTech Connect

The General-Purpose Heat Source (GPHS) is a modular component of the radioisotope thermoelectric generator that will supply power for the Galileo and Ulysses (formerly ISPM) space missions. The GPHS provides power by transmitting the heat of /sup 238/PuO/sub 2/ ..cap alpha..-decay to an array of thermoelectric elements. Because the possibility of an orbital abort always exists, the heat source was designed and constructed to minimize plutonia release in any accident environment. The Safety Verification Test (SVT) series was formulated to evaluate the effectiveness of GPHS plutonia containment after atmospheric reentry and Earth impact. The first report (covering SVT-1 through SVT-6) described the results of flat and side-on module impacts. This report describes module impacts at angles of 15/sup 0/ and 30/sup 0/.

George, T.G.; Pavone, D.

1985-09-01T23:59:59.000Z

4

General-Purpose Heat Source Safety Verification Test program: Edge-on flyer plate tests  

DOE Green Energy (OSTI)

The radioisotope thermoelectric generator (RTG) that will supply power for the Galileo and Ulysses space missions contains 18 General-Purpose Heat Source (GPHS) modules. The GPHS modules provide power by transmitting the heat of STYPu -decay to an array of thermoelectric elements. Each module contains four STYPuO2-fueled clads and generates 250 W(t). Because the possibility of a launch vehicle explosion always exists, and because such an explosion could generate a field of high-energy fragments, the fueled clads within each GPHS module must survive fragment impact. The edge-on flyer plate tests were included in the Safety Verification Test series to provide information on the module/clad response to the impact of high-energy plate fragments. The test results indicate that the edge-on impact of a 3.2-mm-thick, aluminum-alloy (2219-T87) plate traveling at 915 m/s causes the complete release of fuel from capsules contained within a bare GPHS module, and that the threshold velocity sufficient to cause the breach of a bare, simulant-fueled clad impacted by a 3.5-mm-thick, aluminum-alloy (5052-T0) plate is approximately 140 m/s.

George, T.G.

1987-03-01T23:59:59.000Z

5

General-Purpose Heat Source: Research and development program: Cold-Process Verification Test Series  

SciTech Connect

The General-Purpose Heat Source (GPHS) provides power for space missions by transmitting the heat of {sup 238}Pu decay to an array of thermoelectric elements. Because any space mission could experience a launch abort or return from orbit, the heat source must be designed and constructed to survive credible accident environments. Previous testing conducted in support of the Galileo and Ulysses missions documented the response of GPHSs and individual GPHS capsules fueled with {sup 238}UO{sub 2} ({sup 235}U-depleted) to a variety of explosive overpressure and impact events. In the early 1990s, Los Alamos National Laboratory (LANL) resumed fabrication of {sup 238}UO{sub 2} GPHS pellets. The Cold-Process Verification (CPV) Test Series was designed to compare the response of GPHS heat sources loaded with recently fabricated hot- and cold-pressed {sup 238}UO{sub 2} pellets to the response of urania pellets used in the Galileo and Ulysses performance tests. This report documents eleven bare-capsule impacts and one impact of a fully loaded GPHS module. All of the failures observed in the bare-clad impact tests were similar to failures observed in previous safety tests. No failures occurred in the module impact test.

Reimus, M.A.H.; George, T.G.

1996-06-01T23:59:59.000Z

6

Explosion overpressure test series: General-Purpose Heat Source development: Safety Verification Test program  

SciTech Connect

The General-Purpose Heat Source (GPHS) is a modular, radioisotope heat source that will be used in radioisotope thermoelectric generators (RTGs) to supply electric power for space missions. The first two uses will be the NASA Galileo and the ESA Ulysses missions. The RTG for these missions will contain 18 GPHS modules, each of which contains four /sup 238/PuO/sub 2/-fueled clads and generates 250 W/sub (t)/. A series of Safety Verification Tests (SVTs) was conducted to assess the ability of the GPHS modules to contain the plutonia in accident environments. Because a launch pad or postlaunch explosion of the Space Transportation System vehicle (space shuttle) is a conceivable accident, the SVT plan included a series of tests that simulated the overpressure exposure the RTG and GPHS modules could experience in such an event. Results of these tests, in which we used depleted UO/sub 2/ as a fuel simulant, suggest that exposure to overpressures as high as 15.2 MPa (2200 psi), without subsequent impact, does not result in a release of fuel.

Cull, T.A.; George, T.G.; Pavone, D.

1986-09-01T23:59:59.000Z

7

General-Purpose Heat Source Development: Safety Verification Test Program. Flyer plate test series  

SciTech Connect

The General-Purpose Heat Source (GPHS) is a modular component of a radioisotope thermoelectric generator (RTG) that will provide electric power for space missions. The initial RTG applications will be for the NASA Galileo and the ESA Ulysses missions. Each of the 18 GPHS modules in an RTG contains four /sup 238/PuO/sub 2/-fueled clads and generates 250 W/sub (t)/. A series of Safety Verification Tests (SVTs) has been conducted to assess the ability of the GPHS fueled clads to contain the plutonia in accident environments. Because a launch pad or postlaunch explosion of the Space Transportation System Vehicle (space shuttle) is one conceivable accident, the SVT plan included a series of tests to simulate the fragment environment that the RTG and GPHS modules would experience in such an event. These tests deal specifically with the flat-on collision of flyer-plate-type fragments with bare, simulant-fueled (depleted UO/sub 2/) clads. Results of these tests suggest that the fueled clad is only minimally breached by collision with 3.53-mm-thick flyer-plate-type fragments of space shuttle alloy at velocities up to 1170 m/s. However, collision of a 38.1-mm-thick plate with a bare GPHS clad, at a velocity of 270 m/s, results in a total release of fuel.

Cull, T.A.; Pavone, D.

1986-09-01T23:59:59.000Z

8

Purpose  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose Purpose Determine which objects are attracted to a magnet. Performing the experiment 1. Touch the magnet to each object. Which objects or which portions of objects are attracted to the magnet? 2. See if you can attract the paper clip to one end of the magnet and then pick up another paper clip, or nail with the paper clip. 3. Rub the paper clip slowly over the magnet in its long direction about fifty times. Now try to pick up a second paper clip with the first paper clip, but without the magnet. What do you observe? 4. Try the maze - place a paper clip on top of the paper. Place a magnet on the underside of the paper. Can you guide the paper clip through the maze? 5. Try to make your donut magnets look like these. Questions to think about

9

Purpose:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Structured Walkthrough (SWT) Structured Walkthrough (SWT) Process Guide Version 3 September 2002 U.S. Department of Energy Office of the Chief Information Officer Purpose: This process guide describes the method for conducting a structured walkthrough during the lifecycle stages of systems engineering projects, regardless of hardware platform. Organization: This process guide consists of the following sections: $ Overview $ Responsibilities Before the Walkthrough $ Responsibilities During the Walkthrough $ Responsibilities After the Walkthrough $ Additional Activities After the Walkthrough $ Follow-up Activities $ Structured Walkthroughs for Lifecycle Stages $ Structured Walkthroughs for Other Documents $ Structured Walkthrough Meeting Record (sample) $ Structured Walkthrough Management Summary Report (sample)

10

Purpose  

NLE Websites -- All DOE Office Websites (Extended Search)

2/3/2012 2/3/2012 Organization and Human Asset Plan (OHAP) Purpose The Fermilab OHAP is a principal output of the key support process for Strategic Planning and Goals Development within the FRA Contractor Assurance Performance Planning System (M3.) The OHAP development process considers annual forecasts of potentially significant changes to FRA/FNAL mission and scientific program plans and develops strategies and approaches to ensure an adequately trained and skilled future total workforce is available to achieve the Laboratory mission and strategic objectives. OHAP Outcomes As part of the Strategic Planning and Goal Setting process, laboratory management annually reviews potentially significant changes to missions, programs, and initiatives with respect to the FRA/FNAL Strategic and DOE Annual Lab Plans and

11

PURPOSE  

U.S. Energy Information Administration (EIA) Indexed Site

OPERATIONS OPERATIONS REPORT INSTRUCTIONS OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden: 2.7 Hours 1 PURPOSE Form EIA-923 collects information from electric power plants and combined heat and power (CHP) plants in the United States (see Required Respondents immediately below). Data collected on this form include electric power generation, fuel consumption, fossil fuel stocks, delivered fossil fuel cost, combustion byproducts, operational cooling water data, and operational data for NO x , SO 2 , and particulate matter control equipment. These data are used to monitor the status and trends of the electric power industry and appear in many U.S. Energy Information Administration (EIA) publications including: Electric Power Monthly, Electric Power Annual, Monthly Energy Review, Annual Energy Review, Natural Gas Monthly,

12

PURPOSE  

U.S. Energy Information Administration (EIA) Indexed Site

923 923 POWER PLANT OPERATIONS REPORT INSTRUCTIONS OMB No. 1905-0129 Approval Expires: 12/31/2016 Burden: 2.3 Hours 1 PURPOSE Form EIA-923 collects information on the operation of electric power plants and combined heat and power (CHP) plants in the United States (see Required Respondents immediately below). Data collected on this form include electric power generation, fuel consumption, fossil fuel stocks, delivered fossil fuel cost, combustion byproducts, operational cooling water data, and operational data for NO x , SO 2 , particulate matter mercury and acid gas control equipment. These data are used to monitor the status and trends of the electric power industry and appear in many U.S. Energy Information Administration (EIA) publications

13

Environmental assessment of general-purpose heat source safety verification testing  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) was prepared to identify and evaluate potential environmental, safety, and health impacts associated with the Proposed Action to test General-Purpose Heat Source (GPHS) Radioisotope Thermoelectric Generator (RTG) assemblies at the Sandia National Laboratories (SNL) 10,000-Foot Sled Track Facility, Albuquerque, New Mexico. RTGs are used to provide a reliable source of electrical power on board some spacecraft when solar power is inadequate during long duration space missions. These units are designed to convert heat from the natural decay of radioisotope fuel into electrical power. Impact test data are required to support DOE`s mission to provide radioisotope power systems to NASA and other user agencies. The proposed tests will expand the available safety database regarding RTG performance under postulated accident conditions. Direct observations and measurements of GPHS/RTG performance upon impact with hard, unyielding surfaces are required to verify model predictions and to ensure the continual evolution of the RTG designs that perform safely under varied accident environments. The Proposed Action is to conduct impact testing of RTG sections containing GPHS modules with simulated fuel. End-On and Side-On impact test series are planned.

NONE

1995-02-01T23:59:59.000Z

14

Webinar - Software Verification & Validation? - 2012-08-04  

Science Conference Proceedings (OSTI)

Webinar - Software Verification & Validation [1200]. Purpose: Webinar - Software Verification & Validation [1200]. At the ...

2013-06-03T23:59:59.000Z

15

Mastering the Interview Resources General Interview Skills  

E-Print Network (OSTI)

/article.aspx Case Interviews http://www.bcg.com/join_bcg/interview_prep/process/default.aspx http://www.mckinsey.com

16

2013-09-18: Handbook 130 -- Price Verification  

Science Conference Proceedings (OSTI)

Handbook 130 - Price Verification. Purpose: This 2-day seminar is designed so that participants will be able to understand ...

2013-10-23T23:59:59.000Z

17

2013-08-27: Handbook 130 -- Price Verification  

Science Conference Proceedings (OSTI)

Handbook 130 - Price Verification. Purpose: This 2-day seminar is designed so that participants will be able to understand ...

2013-08-26T23:59:59.000Z

18

Carbon Storage Monitoring, Verification and Accounting Research |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Monitoring, Verification and Accounting Research Monitoring, Verification and Accounting Research Carbon Storage Monitoring, Verification and Accounting Research Reliable and cost-effective monitoring, verification and accounting (MVA) techniques are an important part of making geologic sequestration a safe, effective, and acceptable method for greenhouse gas control. MVA of geologic storage sites is expected to serve several purposes, including addressing safety and environmental concerns; inventory verification; project and national accounting of greenhouse gas emissions reductions at geologic storage sites; and evaluating potential regional, national, and international greenhouse gas reduction goals. The goal of our program area is to develop and demonstrate a broad portfolio of technologies, applications, and accounting requirements that

19

Acceptance sampling methods for sample results verification  

SciTech Connect

This report proposes a statistical sampling method for use during the sample results verification portion of the validation of data packages. In particular, this method was derived specifically for the validation of data packages for metals target analyte analysis performed under United States Environmental Protection Agency Contract Laboratory Program protocols, where sample results verification can be quite time consuming. The purpose of such a statistical method is to provide options in addition to the ``all or nothing`` options that currently exist for sample results verification. The proposed method allows the amount of data validated during the sample results verification process to be based on a balance between risks and the cost of inspection.

Jesse, C.A.

1993-06-01T23:59:59.000Z

20

Motivational Interviewing Treatment Integrity  

E-Print Network (OSTI)

Motivational interviewing is a client-centered, goaloriented approach to counseling, with the objective to increase a person’s intrinsic motivation for behavior change through the exploration and resolution of ambivalence (Miller & Rollnick, 2002). The aims of motivational interviewing are to increase a person’s motivation for behavior change and to strengthen that commitment to change. The spirit of this approach emphasizes collaboration over confrontation, evocation over education, and autonomy over authority (Miller & Rollnick, 2002). The technique has four guiding principles (Miller,

unknown authors

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Using Structured Interviewing Techniques  

E-Print Network (OSTI)

GAO assists congressional decisionmakers in their deliberative process by furnishing analytical information on issues and options under consideration. Many diverse methodologies are needed to develop sound and timely answers to the questions that are posed by the Congress. To provide GAO evaluators with basic information about the more commonly used methodologies, GAO’s policy guidance includes documents such as methodology transfer papers and technical guidelines, This methodology transfer paper on using structured interviewing techniques discusses how GAO evaluators should incorporate structured interview techniques when appropriate to performing our work. It explains when these techniques should be

Gao/pemd-. Preface; Werner Grosshans

1991-01-01T23:59:59.000Z

22

Interview of Les Hiatt  

E-Print Network (OSTI)

Interview of Les Hiatt by Alan Macfarlane on 14th July 2005 0:05:07 Introduction; born 1931 in Gilgandra, New South Wales; father son of English migrants; his father became a miller; father became a book-keeper and later manager of flour mill...

Hiatt, Les

2005-08-24T23:59:59.000Z

23

Interview with Philip Gulliver  

E-Print Network (OSTI)

. for a flour mill and similar for a tannery; both now closed by a new factories and a confectioner whose records have also been examined; also checked migration of workers; interviewed people and done participant observation 0:28:15 Participant...

Gulliver, Philip

2004-06-29T23:59:59.000Z

24

Model Verification  

Science Conference Proceedings (OSTI)

...programming languages (such as Python, C++, and Java), often using special-purpose application programming interfaces (APIs) such as the NAG or IMSL numerical libraries. (Commercially available NAG and IMSL libraries contain large collections of well-tested numerical algorithms in several different...

25

Linguistic profiling of texts for the purpose of language verification  

Science Conference Proceedings (OSTI)

In order to control the quality of internet-based language corpora, we developed a method to verify automatically that texts are of (near-) native quality. For the LOCNESS and ICLE corpora, the method is rather successful in separating native and non-native ...

Hans Van Halteren; Nelleke Oostdijk

2004-08-01T23:59:59.000Z

26

Verification of Adaptive Systems  

SciTech Connect

Adaptive systems are critical for future space and other unmanned and intelligent systems. Verification of these systems is also critical for their use in systems with potential harm to human life or with large financial investments. Due to their nondeterministic nature and extremely large state space, current methods for verification of software systems are not adequate to provide a high level of assurance for them. The combination of stabilization science, high performance computing simulations, compositional verification and traditional verification techniques, plus operational monitors, provides a complete approach to verification and deployment of adaptive systems that has not been used before. This paper gives an overview of this approach.

Pullum, Laura L [ORNL; Cui, Xiaohui [New York Institute of Technology (NYIT); Vassev, Emil [Lero – The Irish Software Engineering Research Centre; Hinchey, Mike [Lero – The Irish Software Engineering Research Centre; Rouff, Christopher [Lockheed Martin Corporation; Buskens, Richard [Lockheed Martin Corporation

2012-01-01T23:59:59.000Z

27

An Interview with Danilo Dolci  

E-Print Network (OSTI)

nuvole ed immaginano la bomba atomica. Queste cose devonoHiroshima fosse esplosa una bomba atomica. AN INTERVIEW WITH

Lazazzera, Teresa

1981-01-01T23:59:59.000Z

28

ORISE: Independent verification  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent verification Independent verification ORISE techinician performs environmental scanning The Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessments and verification to determine the effectiveness of radiological cleanup at decontamination and decommissioning (D&D) projects across the United States. Since 1980, ORISE has performed independent verification at more than 500 sites in 42 states and the District of Columbia. As the primary independent verification contractor for all U.S. Department of Energy (DOE) cleanup projects and the only verification contractor for the U.S. Nuclear Regulatory Commission (NRC), we validate that soil, water and structures are within established state and federal release criteria, and can be safely designated for public use.

29

Treaty Verification | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification SHARE Treaty Verification ORNL is a strong contributor to future nonproliferation and arms control initiatives through research and development of radiation...

30

Thermal Monitoring Approaches for Energy Savings Verification  

E-Print Network (OSTI)

This paper reviews and summarizes techniques for monitoring thermal energy flows for the purpose of verifying energy savings in industrial and large institutional energy conservation projects. Approaches for monitoring hot and chilled water, steam, steam condensate and boiler feedwater in large facilities are described. Insights gained and lessons learned through the actual in-field installation of thermal monitoring equipment for energy savings verification purposes at over 100 sites at various locations throughout the United States are presented.

McBride, J. R.; Bohmer, C. J.; Lippman, R. H.; Zern, M. J.

1996-04-01T23:59:59.000Z

31

Theorem Proving: Not an Esoteric Diversion, but the Unifying Framework for Industrial Verification  

E-Print Network (OSTI)

The effectiveness of hardware verification techniques has increased markedly in the past decade. As hardware verification techniques become increasingly powerful the idea of transitioning verification technology to industry can be taken seriously. Nevertheless, powerful decision procedures that can completely automate the verification of certain types of hardware, whether they are BDD based model-checkers [10] or automatic microprocessor verification tools [4], cannot be adequate on their own for industrial hardware verification. However, a high-level, general-purpose theorem prover with specific capabilities can provide an overall framework in which these tools can be embedded and in which they can then be effectively used for industrial hardware verification. 1 Introduction The effectiveness of hardware verification techniques has increased markedly in the past decade. These techniques span a spectrum from automatic techniques to interactive theorem proving techniques. At one end o...

D. A. Cyrluk; M. K. Srivas

1995-01-01T23:59:59.000Z

32

Modular data structure verification  

E-Print Network (OSTI)

This dissertation describes an approach for automatically verifying data structures, focusing on techniques for automatically proving formulas that arise in such verification. I have implemented this approach with my ...

Kuncak, Viktor (Viktor Jaroslav), 1977-

2007-01-01T23:59:59.000Z

33

Automated deduction for verification  

Science Conference Proceedings (OSTI)

Automated deduction uses computation to perform symbolic logical reasoning. It has been a core technology for program verification from the very beginning. Satisfiability solvers for propositional and first-order logic significantly automate the task ...

Natarajan Shankar

2009-10-01T23:59:59.000Z

34

Monitoring, verification, and accounting  

NLE Websites -- All DOE Office Websites (Extended Search)

verification, and accounting (MVA) activities are underway verification, and accounting (MVA) activities are underway to ensure the injected CO 2 remains in the geologic formation. The first plant has been capturing CO 2 since December 2012, while the second plant completed construction in February and began carbon capture operations in March. Both units are now operating at full capacity. More than 222,000 tons of CO 2 have been captured and provided for storage

35

Interview  

E-Print Network (OSTI)

every two years; the three major ideas were Thatcherism, the decline of the Left, and new times post-Fordism; I am very proud of what we achieved in that period, and it was for me one of the two most stimulating things I have ever done in my life... by limping on into oblivion, so I did so 12:04:19 I also co-started Demos, but I am not as proud of that as Marxism Today; we had thought we should try and set up a new magazine and also a think-tank because what Marxism Today was not good...

Jacques, Martin; Macfarlane, Alan

36

Interview  

Science Conference Proceedings (OSTI)

Jan 31, 2011 ... Engineering continues to grow ever more rich and diverse, and ... This is healthy, but this diversity makes it challenging to keep a focus on the ...

37

INTERVIEW OF PROFESSOR DAVID LEVINSON OUTLINE OF INTERVIEW QUESTIONS  

E-Print Network (OSTI)

that the story of transportation policy can tell us what transportation, is, does, and might do in the future on transportation field in the U.S., today we'd like to interview you on a few topics on transportation in the West and professional background? Especially how did you get into the transportation field? I have long been interested

Levinson, David M.

38

International Comparison of Product Certification and Verification...  

NLE Websites -- All DOE Office Websites (Extended Search)

International Comparison of Product Certification and Verification Methods for Appliances Title International Comparison of Product Certification and Verification Methods for...

39

Quantum Money with Classical Verification  

E-Print Network (OSTI)

We construct a quantum money scheme that allows verification through classical communication with bank. This is the first demonstration that a secure quantum money scheme exists that does not require quantum communication for coin verification.

Gavinsky, Dmitry

2011-01-01T23:59:59.000Z

40

Interview with Andrew C. Kadak  

Science Conference Proceedings (OSTI)

This article is an interview with the president and Chief Executive Officer of the Yankee Atomic Electric Company about a wide variety of aspects of the decommissioning of the Yankee Nuclear Power plant. Included are discussions of political aspects, decommissioning schedules, local impacts, technical issues of decommissioning, personnel management during decommissioning, etc.

Schabes, D. [ed.

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Verification and validation benchmarks.  

SciTech Connect

Verification and validation (V&V) are the primary means to assess the accuracy and reliability of computational simulations. V&V methods and procedures have fundamentally improved the credibility of simulations in several high-consequence fields, such as nuclear reactor safety, underground nuclear waste storage, and nuclear weapon safety. Although the terminology is not uniform across engineering disciplines, code verification deals with assessing the reliability of the software coding, and solution verification deals with assessing the numerical accuracy of the solution to a computational model. Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and validation benchmarks have been constructed for a number of years in every field of computational simulation. However, no comprehensive guidelines have been proposed for the construction and use of V&V benchmarks. For example, the field of nuclear reactor safety has not focused on code verification benchmarks, but it has placed great emphasis on developing validation benchmarks. Many of these validation benchmarks are closely related to the operations of actual reactors at near-safety-critical conditions, as opposed to being more fundamental-physics benchmarks. This paper presents recommendations for the effective design and use of code verification benchmarks based on manufactured solutions, classical analytical solutions, and highly accurate numerical solutions. In addition, this paper presents recommendations for the design and use of validation benchmarks, highlighting the careful design of building-block experiments, the estimation of experimental measurement uncertainty for both inputs and outputs to the code, validation metrics, and the role of model calibration in validation. It is argued that the understanding of predictive capability of a computational model is built on the level of achievement in V&V activities, how closely related the V&V benchmarks are to the actual application of interest, and the quantification of uncertainties related to the application of interest.

Oberkampf, William Louis; Trucano, Timothy Guy

2007-02-01T23:59:59.000Z

42

Labor Standards Interview Form | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards Interview Form Labor Standards Interview Form SF 1445.pdf More Documents & Publications Labor Standards for Construction Chapter 22 - Labor Standards for Construction CRB...

43

CRB Interview Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process CRB Interview Process 6CRBinterviewprocess.pdf More Documents & Publications CRB Interview Guidance Microsoft Word - Policy Flash 2008-13.doc Microsoft Word - DRAFT CRB...

44

NUMERICAL VERIFICATION OF EQUILIBRIUM CHEMISTRY  

SciTech Connect

A numerical tool is in an advanced state of development to compute the equilibrium compositions of phases and their proportions in multi-component systems of importance to the nuclear industry. The resulting software is being conceived for direct integration into large multi-physics fuel performance codes, particularly for providing boundary conditions in heat and mass transport modules. However, any numerical errors produced in equilibrium chemistry computations will be propagated in subsequent heat and mass transport calculations, thus falsely predicting nuclear fuel behaviour. The necessity for a reliable method to numerically verify chemical equilibrium computations is emphasized by the requirement to handle the very large number of elements necessary to capture the entire fission product inventory. A simple, reliable and comprehensive numerical verification method is presented which can be invoked by any equilibrium chemistry solver for quality assurance purposes.

Piro, Markus [Royal Military College of Canada; Lewis, Brent [Royal Military College of Canada; Thompson, Dr. William T. [Royal Military College of Canada; Simunovic, Srdjan [ORNL; Besmann, Theodore M [ORNL

2010-01-01T23:59:59.000Z

45

Review of the Y-1-12 Implementation Verification Review Processes, June 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 Implementation Verification Review Y-12 Implementation Verification Review Processes May 2011 June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1

46

Review of the Y-1-12 Implementation Verification Review Processes, June 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Y-12 Implementation Verification Review Y-12 Implementation Verification Review Processes May 2011 June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1

47

TFE Verification Program  

DOE Green Energy (OSTI)

The objective of the semiannual progress report is to summarize the technical results obtained during the latest reporting period. The information presented herein will include evaluated test data, design evaluations, the results of analyses and the significance of results. The program objective is to demonstrate the technology readiness of a TFE suitable for use as the basic element in a thermionic reactor with electric power output in the 0.5 to 5.0 MW(e) range, and a full-power life of 7 years. The TF Verification Program builds directly on the technology and data base developed in the 1960s and 1970s in an AEC/NASA program, and in the SP-100 program conducted in 1983, 1984 and 1985. In the SP-100 program, the attractive but concern was expressed over the lack of fast reactor irradiation data. The TFE Verification Program addresses this concern. The general logic and strategy of the program to achieve its objectives is shown on Fig. 1-1. Five prior programs form the basis for the TFE Verification Program: (1) AEC/NASA program of the 1960s and early 1970; (2) SP-100 concept development program;(3) SP-100 thermionic technology program; (4) Thermionic irradiations program in TRIGA in FY-86; (5) and Thermionic Technology Program in 1986 and 1987. 18 refs., 64 figs., 43 tabs.

Not Available

1990-03-01T23:59:59.000Z

48

Quantum Money with Classical Verification  

E-Print Network (OSTI)

We propose and construct a quantum money scheme that allows verification through classical communication with a bank. This is the first demonstration that a secure quantum money scheme exists that does not require quantum communication for coin verification. Our scheme is secure against adaptive adversaries - this property is not directly related to the possibility of classical verification, nevertheless none of the earlier quantum money constructions is known to possess it.

Dmitry Gavinsky

2011-09-02T23:59:59.000Z

49

CRB Interview Guidance | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

More Documents & Publications CRB Interview Process Microsoft Word - DRAFT CRB Interview Guidance.doc Audit of Department of Energy's Contractor Salary Increase Funds, CR-B-97-02...

50

Interview with Dieter Richter | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

discusses "common thread" linking unconventional superconducting materials Dec. 2011, Interview by Deborah Counce Douglas Scalapino Professor Emeritus Douglas Scalapino....

51

Access to recorded interviews: A research agenda  

Science Conference Proceedings (OSTI)

Recorded interviews form a rich basis for scholarly inquiry. Examples include oral histories, community memory projects, and interviews conducted for broadcast media. Emerging technologies offer the potential to radically transform the way in which recorded ... Keywords: Interviews, access technology, oral history, speech indexing, spoken word archives

Franciska De Jong; Douglas W. Oard; Willemijn Heeren; Roeland Ordelman

2008-06-01T23:59:59.000Z

52

Automatic Verification of String Manipulating ProgramsOverview Outline Overview Symbolic String Verification Composite Verification References  

E-Print Network (OSTI)

Is it Vulnerable? We investigate string verification problem and present an automata-based approach for automatic verification of string manipulating programs based on symbolic string analysis. String analysis plays an important role in the security area. For instance, one can detect various web vulnerabilities like SQL Command Injection and Cross Site Scripting (XSS) attacks. Fang Yu, UCSB Automatic Verification of String Manipulating ProgramsOutline

Fang Yu; Cs Guest Leture

2009-01-01T23:59:59.000Z

53

Biometric verification/identification based on hands natural layout  

Science Conference Proceedings (OSTI)

In this paper, a hand biometric system for verification and recognition purposes is presented. The method is based on three keys. Firstly, the system is based on using a Natural Reference System (NRS) defined on the hand's natural layout. Consequently, ... Keywords: Biometric systems, Hand geometry, Invariant features, Security, Similarity

Miguel Adán; Antonio Adán; Andrés S. Vázquez; Roberto Torres

2008-04-01T23:59:59.000Z

54

Security and Verification Provable cryptography  

E-Print Network (OSTI)

Security and Verification Provable cryptography Benjamin Grégoire1 Tamara Rezk1 1INRIA Sophia Antipolis - Méditerranée, France Cours de Master 2 Univerisité de Nice Sophia-Antipolis Security and Verification 1/ 33 #12;Cryptanalysis-driven Security Propose a cryptographic scheme Wait for someone to come

Gregoire, Benjamin - Institut National de Recherche en Informatique et en Automatique, Centre de recherche Sophia Antipolis

55

ETV Joint Verification Statement  

E-Print Network (OSTI)

Verification Program (ETV) to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. The goal of the ETV Program is to further environmental protection by substantially accelerating the acceptance and use of improved and cost-effective technologies. ETV seeks to achieve this goal by providing high-quality, peer-reviewed data on technology performance to those involved in the design, distribution, financing, permitting, purchase, and use of environmental technologies. ETV works in partnership with recognized standards and testing organizations and stakeholder groups consisting of regulators, buyers, and vendor organizations, with the full participation of individual technology developers. The program evaluates the performance of innovative technologies by developing test plans that are responsive to the needs of stakeholders, conducting field or laboratory tests (as appropriate), collecting and analyzing data, and preparing peer-reviewed reports. All evaluations are conducted in accordance with rigorous quality assurance protocols to ensure that data of known and adequate quality are generated and that the results are defensible.

unknown authors

1999-01-01T23:59:59.000Z

56

The Integrated Safety Management System Verification Enhancement Review of the Plutonium Finishing Plant (PFP)  

SciTech Connect

The primary purpose of the verification enhancement review was for the DOE Richland Operations Office (RL) to verify contractor readiness for the independent DOE Integrated Safety Management System Verification (ISMSV) on the Plutonium Finishing Plant (PFP). Secondary objectives included: (1) to reinforce the engagement of management and to gauge management commitment and accountability; (2) to evaluate the ''value added'' benefit of direct public involvement; (3) to evaluate the ''value added'' benefit of direct worker involvement; (4) to evaluate the ''value added'' benefit of the panel-to-panel review approach; and, (5) to evaluate the utility of the review's methodology/adaptability to periodic assessments of ISM status. The review was conducted on December 6-8, 1999, and involved the conduct of two-hour interviews with five separate panels of individuals with various management and operations responsibilities related to PFP. A semi-structured interview process was employed by a team of five ''reviewers'' who directed open-ended questions to the panels which focused on: (1) evidence of management commitment, accountability, and involvement; and, (2) consideration and demonstration of stakeholder (including worker) information and involvement opportunities. The purpose of a panel-to-panel dialogue approach was to better spotlight: (1) areas of mutual reinforcement and alignment that could serve as good examples of the management commitment and accountability aspects of ISMS implementation, and, (2) areas of potential discrepancy that could provide opportunities for improvement. In summary, the Review Team found major strengths to include: (1) the use of multi-disciplinary project work teams to plan and do work; (2) the availability and broad usage of multiple tools to help with planning and integrating work; (3) senior management presence and accessibility; (4) the institutionalization of worker involvement; (5) encouragement of self-reporting and self-assessment by management; (6) the availability of multiple internal communication mechanisms; and, (7) the existence of overall facility-wide safety management goals as well as individualized project work team goals. Major opportunities for improvement identified include: (1) the enhancement of external communications relative to ISM; (2) the institutionalization of ISM-related performance agreements/incentives; (3) the strengthening of feedback loops; (4) fine-tuning the use of tools; and, (5) the formalization of good practices.

BRIGGS, C.R.

2000-02-09T23:59:59.000Z

57

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

58

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

59

PURPOSE  

U.S. Energy Information Administration (EIA) Indexed Site

OPERATIONS REPORT OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden: 2.7 Hours NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1. IDENTIFICATION Survey Contact

60

Purpose  

NLE Websites -- All DOE Office Websites (Extended Search)

Student Name Fill out the chart below. Coca- Cola (red) Diet Coke (silver) Caffeine- free Coke (gold) Caffeine- free Diet Coke (gold)...

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

PURPOSE  

Science Conference Proceedings (OSTI)

... DRI® Associate Business Continuity Professional (ABCP) DRI® Certified Functional Continuity Professional (CFCP). DRI ...

2010-10-22T23:59:59.000Z

62

Purpose  

Science Conference Proceedings (OSTI)

... when its light beam is interrupted by a flag on the ... were installed in 1994 and the Mo tube in 2008. d Two x-ray tubes are used in the mammography ...

2010-07-21T23:59:59.000Z

63

PURPOSE  

U.S. Energy Information Administration (EIA) Indexed Site

1. COST AND QUALITY OF FUEL PURCHASES - PLANT LEVEL CONTRACT INFORMATION, RECEIPTS, AND COSTS For coal-fueled plants 50megawatts and above; and for plants fueled by natural gas,...

64

PURPOSE  

Science Conference Proceedings (OSTI)

... LIGHTWEIGHT AGGREGATE (Expanded Shale - Northeast Solite). Aggregate Size Distributions. ... Lightweight Sand [Expanded Shale]. ...

2005-07-16T23:59:59.000Z

65

Purpose  

Science Conference Proceedings (OSTI)

... vials are cleaned by immersing in ethanol with agitation ... is at the discretion of the calibration staff. ... facility of the National Physical Laboratory of the ...

2010-07-21T23:59:59.000Z

66

Purpose  

Science Conference Proceedings (OSTI)

... Active cooling with the turbojet air chiller is available for the GC232 and GC207 to maintain sample temperatures down to -77 o C. To operate the ...

2010-07-21T23:59:59.000Z

67

Guidelines for the verification and validation of expert system software and conventional software: Survey and documentation of expert system verification and validation methodologies. Volume 3  

SciTech Connect

This report is the third volume in the final report for the Expert System Verification and Validation (V&V) project which was jointly sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute. The ultimate objective is the formulation of guidelines for the V&V of expert systems for use in nuclear power applications. The purpose of this activity was to survey and document techniques presently in use for expert system V&V. The survey effort included an extensive telephone interviewing program, site visits, and a thorough bibliographic search and compilation. The major finding was that V&V of expert systems is not nearly as established or prevalent as V&V of conventional software systems. When V&V was used for expert systems, it was almost always at the system validation stage after full implementation and integration usually employing the non-systematic dynamic method of {open_quotes}ad hoc testing.{close_quotes} There were few examples of employing V&V in the early phases of development and only weak sporadic mention of the possibilities in the literature. There is, however, a very active research area concerning the development of methods and tools to detect problems with, particularly, rule-based expert systems. Four such static-testing methods were identified which were not discovered in a comprehensive review of conventional V&V methods in an earlier task.

Groundwater, E.H.; Miller, L.A.; Mirsky, S.M. [Science Applications International Corp., McLean, VA (United States)

1995-03-01T23:59:59.000Z

68

Our purpose and direction Our purpose and direction  

E-Print Network (OSTI)

1 Our purpose and direction #12;Our purpose and direction Contents MINISTERS' FOREWORD 3 organisation 8 Our People 8 Our finances 8 Business sustainability ­ `Greenerways' 9 OUR DIRECTION 10 Our: Financial resources 56 2 #12;Our purpose and direction Ministers' Foreword I am very pleased to be providing

69

Our purpose and direction Our purpose and direction  

E-Print Network (OSTI)

1 Our purpose and direction #12;Our purpose and direction Contents MINISTERS' FOREWORD 3 8 Our People 8 Our finances 8 Business sustainability ­ `Greenerways' 9 OUR DIRECTION 10 Our Appendix 2: Business measures 55 Appendix 3: Financial resources 56 2 #12;3 Our purpose and direction

70

NREL: Director's Page - Interviews and Articles  

NLE Websites -- All DOE Office Websites (Extended Search)

of Let's Talk interviews NREL Director Dr. Dan Arvizu about NREL's role in American energy policy and the challenges facing renewable energy development. Dr. Arvizu also...

71

CRAD, Verification and Validation of Facilities Procedures Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Verification and Validation of Facilities Procedures Verification and Validation of Facilities Procedures Assessment Plan CRAD, Verification and Validation of Facilities Procedures Assessment Plan Performance Objective: The purpose of this assessment is verify and validate the process for the development of operations procedures and that procedures are in place which provide direction to personnel to ensure that the facility is operated within its design bases. Criteria: Operations procedures should be written to provide specific direction for operating systems and equipment during normal and postulated abnormal and emergency conditions. (DOE O 5480.19 A) Operations procedures should provide appropriate direction to ensure that the facility is operated within its design bases and should be effectively used to support safe operations of the facility. (DOE O

72

Scoring Rules for Forecast Verification  

Science Conference Proceedings (OSTI)

The problem of probabilistic forecast verification is approached from a theoretical point of view starting from three basic desiderata: additivity, exclusive dependence on physical observations (“locality”), and strictly proper behavior. By ...

Riccardo Benedetti

2010-01-01T23:59:59.000Z

73

Wavelets and Field Forecast Verification  

Science Conference Proceedings (OSTI)

Current field forecast verification measures are inadequate, primarily because they compress the comparison between two complex spatial field processes into one number. Discrete wavelet transforms (DWTs) applied to analysis and contemporaneous ...

William M. Briggs; Richard A. Levine

1997-06-01T23:59:59.000Z

74

Runtime verification: the application perspective  

Science Conference Proceedings (OSTI)

In the past decade, Runtime Verification (RV) has gained much focus, from both the research community and practitioners. Roughly speaking, RV combines a set of theories, techniques and tools aiming towards efficient analysis of systems' executions and ...

Yliès Falcone; Lenore D. Zuck

2012-10-01T23:59:59.000Z

75

AHAM DOE Verification Test Agreement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Verification Test Agreement AHAM DOE Verification Test Agreement This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing...

76

Code verification by static analysis: a mathematical programming ...  

E-Print Network (OSTI)

Code verification by static analysis: a mathematical ... One of the most important verification techniques is static code analysis by abstract ...... verif-instances.zip.

77

Everywhere and Nowhere: Focus Groups as All-Purpose Devices  

E-Print Network (OSTI)

The focused-interview technique of “graphic reinstatement”Interviews: Comparing Consumers’ Attitudes Across Qualitative Techniques,”

Lemov, Rebecca

2012-01-01T23:59:59.000Z

78

An Interview with Vaughan Merlyn on Management  

Science Conference Proceedings (OSTI)

Vaughan Merlyn, who is a management consultant, researcher, and author, has had as his primary focus for more than three decades now has been the use of information and information technology for business value creation. He was interviewed about software ...

Ubiquity staff

2008-04-01T23:59:59.000Z

79

A New Verification Score for Public Forecasts  

Science Conference Proceedings (OSTI)

CREF, a new verification score for public forecasts, is introduced. This verification score rewards a forecaster who forecasts a rare event accurately. CREF was used to verify local forecasts at the Weather Service Forecast Office (WSFO) in ...

Dean P. Gulezian

1981-02-01T23:59:59.000Z

80

Scientific Verification of Deterministic River Stage Forecasts  

Science Conference Proceedings (OSTI)

One element of a complete verification system is the ability to determine why forecasts behave as they do. This paper describes and demonstrates an operationally feasible method for conducting this type of diagnostic verification analysis. ...

Edwin Welles; Soroosh Sorooshian

2009-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Forecast verification: Its Complexity and Dimensionality  

Science Conference Proceedings (OSTI)

Two fundamental characteristics of forecast verification problems—complexity and dimensionality—are described. To develop quantitative definitions of these characteristics, a general framework for the problem of absolute verification (AV) is ...

Allan H. Murphy

1991-07-01T23:59:59.000Z

82

RENEWABLES PORTFOLIO STANDARD 2006 PROCUREMENT VERIFICATION  

E-Print Network (OSTI)

California Energy Commission DRAFT STAFF REPORT RENEWABLES PORTFOLIO STANDARD 2007 PROCUREMENT VERIFICATION RPS 2007 Verification Report APRIL 2011 CEC3002011002SD #12;CALIFORNIA ENERGY COMMISSION Gina Executive Director DISCLAIMER Staff members of the California Energy Commission prepared this report

83

Verification and validation of simulation models  

Science Conference Proceedings (OSTI)

In this paper we discuss verification and validation of simulation models. Four different approaches to deciding model validity are described; two different paradigms that relate verification and validation to the model development process are presented; ...

Robert G. Sargent

2009-12-01T23:59:59.000Z

84

Combining CSP and B for Specification and Property Verification  

E-Print Network (OSTI)

Abstract. ProB is a model checking tool for the B Method. In this paper we present an extension of ProB that supports checking of specifications written in a combination of CSP and B. We explain how the notations are combined semantically and give an overview of the implementation of the combination. We illustrate the benefit that appropriate use of CSP, in conjunction with our tool, gives to B developments both for specification and for verification purposes.

Michael Butler; Michael Leuschel

2005-01-01T23:59:59.000Z

85

Guidelines for the Monitoring, Evaluation, Reporting, Verification...  

NLE Websites -- All DOE Office Websites (Extended Search)

Evaluation, Reporting, Verification, and Certification of Forestry Projects for Climate Change Mitigation Title Guidelines for the Monitoring, Evaluation, Reporting,...

86

Lessons Learned from Independent Verification Activities | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

control after the property has been demonstrated to meet the Department's stringent radiation protection requirements. Lessons Learned from Independent Verification...

87

Nuclear Verification | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Verification | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

88

K Basins Field Verification Program  

SciTech Connect

The Field Verification Program establishes a uniform and systematic process to ensure that technical information depicted on selected engineering drawings accurately reflects the actual existing physical configuration. This document defines the Field Verification Program necessary to perform the field walkdown and inspection process that identifies the physical configuration of the systems required to support the mission objectives of K Basins. This program is intended to provide an accurate accounting of the actual field configuration by documenting the as-found information on a controlled drawing.

Booth, H.W.

1994-12-02T23:59:59.000Z

89

Fingerprint verification using statistical descriptors  

Science Conference Proceedings (OSTI)

The importance of high precision matching in fingerprint cannot be over-emphasized. This paper presents a novel fingerprint verification algorithm which improves matching accuracy by overcoming the shortcomings of poor image quality. The proposed method ... Keywords: Biometrics, Fingerprint, Reliability, Singular point, Statistical analysis

Mohammed S. Khalil; Dzulkifli Mohamad; Muhammad Khurram Khan; Qais Al-Nuzaili

2010-07-01T23:59:59.000Z

90

Focus Groups and Interviews VERSION 2: Final  

E-Print Network (OSTI)

are not used for military purposes, and facilitate effective waste management. In contrast to Chernobyl

91

ARM - Carlos Sousa Interview (English Version)  

NLE Websites -- All DOE Office Websites (Extended Search)

DeployementCarlos Sousa Interview (English Version) DeployementCarlos Sousa Interview (English Version) Azores Deployment AMF Home Graciosa Island Home Data Plots and Baseline Instruments Satellite Retrievals Experiment Planning CAP-MBL Proposal Abstract and Related Campaigns Science Questions Science Plan (PDF, 4.4M) Rob Wood Website Outreach Backgrounders English Version (PDF, 363K) Portuguese Version (PDF, 327K) AMF Posters, 2009 English Version Portuguese Version Education Flyers English Version Portuguese Version News Campaign Images Carlos Sousa Interview (English Version) From Graciosa to India. Thanks to the Atmospheric Station. (From Aςoriano Oriental, March 5, 2012) Carlos Sousa works on an instrument at the ARM India site. Carlos Sousa works on an instrument at the ARM India site. To be at the right place at the right time, can change a person's life.

92

Atomic Energy for Military Purposes  

E-Print Network (OSTI)

Atomic Energy for Military Purposes: The Official Report on the Development of the Atomic Bomb member of the project, to draft a report about its activities. Smyth completed the report in the summer, in a censored version. On August 11, 1945, five days after the Allies dropped the first nuclear bomb on Japan

Landweber, Laura

93

Interview of Dan McKenzie  

E-Print Network (OSTI)

school in Kensington; mother's background was completely different; she was brought up in Leeds and father was a labourer; she got a State Scholarship and applied to come to Newnham to read English; at her interview made her read aloud which emphasized...

McKenzie, Dan

2007-05-18T23:59:59.000Z

94

Transitioning Kentucky Off Oil: An Interview with Clean Cities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell...

95

Analytical Benchmark Test Set for Criticality Code Verification  

Science Conference Proceedings (OSTI)

A number of published numerical solutions to analytic eigenvalue (k{sub eff}) and eigenfunction equations are summarized for the purpose of creating a criticality verification benchmark test set. The 75-problem test set allows the user to verify the correctness of a criticality code for infinite medium and simple geometries in one- and two-energy groups, one- and two-media, and both isotropic and anisotropic neutron scattering. The problem specifications will produce both k{sub eff} = 1 and the quoted k{sub {infinity}} to at least five decimal places. Additional uses of the test set for code verification are also discussed. A list of 45 references and an appendix with k{sub {infinity}} derivations is also included.

Avneet Sood; D. K. Parsons; R. A. Forster

1999-07-01T23:59:59.000Z

96

Directed Search for the Verification of Communication Protocols  

E-Print Network (OSTI)

There is a need for formal methods to verify correctness of software and hardware systems. Automated verification techniques basically explore the state space of a system in order to establish whether or not it behaves correctly. The main drawback of such methods is the state explosion problem. The size of the state space can grow exponentially in the number of components of the system, especially in asynchronous concurrent systems. In early stages of system development, errors are likely to appear. As a matter of fact, in practice, automated verification has been shown to be more successful in finding errors in systems than in proving correctness. Usually, one applies reachability algorithms like depth-first, and breadth-first search for this purpose. Breadth-first search is, in general, not memory-efficient, but offers shortest counterexamples. On the other hand, depth-first search is more memory-efficient, but delivers suboptimal counterexamples. We propose and analyze the use of...

Alberto Lluch Lafuente; Dekan Prof; Erstgutachter Prof; Dr. Thomas Ottmann; Dr. Thomas Ottmann; Zweitgutachter Prof; Dr. Stefan Leue

2003-01-01T23:59:59.000Z

97

Verification and transparency in future arms control  

Science Conference Proceedings (OSTI)

Verification`s importance has changed dramatically over time, although it always has been in the forefront of arms control. The goals and measures of verification and the criteria for success have changed with the times as well, reflecting such factors as the centrality of the prospective agreement to East-West relations during the Cold War, the state of relations between the United States and the Soviet Union, and the technologies available for monitoring. Verification`s role may be declining in the post-Cold War period. The prospects for such a development will depend, first and foremost, on the high costs of traditional arms control, especially those associated with requirements for verification. Moreover, the growing interest in informal, or non-negotiated arms control does not allow for verification provisions by the very nature of these arrangements. Multilateral agreements are also becoming more prominent and argue against highly effective verification measures, in part because of fears of promoting proliferation by opening sensitive facilities to inspectors from potential proliferant states. As a result, it is likely that transparency and confidence-building measures will achieve greater prominence, both as supplements to and substitutes for traditional verification. Such measures are not panaceas and do not offer all that we came to expect from verification during the Cold war. But they may be the best possible means to deal with current problems of arms reductions and restraints at acceptable levels of expenditure.

Pilat, J.F.

1996-09-01T23:59:59.000Z

98

Some thoughts on model verification  

DOE Green Energy (OSTI)

The most powerful attribute of numerical models for simulating fluid flow in partially saturated fractured media is that they can handle arbitrarily complex problems in terms of geometry, heterogeneity and forcing functions. In contrast, analytical solutions can be only obtained for relatively simple problems. Therefore, the very power of the numerical models that is to be exploited is unnecessarily abridged if the numerical method is viewed merely as a tool for approximately solving the partial differential equation. A broader definition of verification is needed in order to exploit the power and generality of numerical models. In the ultimate, verification should be dictated by axiomatic testability. The development of self-verifying numerical models is a challenge that deserves pursuit.

Narasimhan, T.N.

1987-02-01T23:59:59.000Z

99

Electric Utility Measurement & Verification Program  

E-Print Network (OSTI)

BC Hydro is an electric utility with a service area covering over 95% of the province of British Columbia in Canada. Power Smart is BC Hydro’s demand-side-management (DSM) division. Power Smart develops, operates and manages various DSM programs for residential, commercial and industrial customers. The Measurement and Verification (M&V) of applicable Power Smart Industrial projects is the process of verifying the results of the implementation of energy conservation measures (ECMs) at industrial customer facilities. Power Smart M&V activities are based on the International Performance Measurement & Verification Protocol (IPMVP); a consensus document produced with the international support of industry and government. This paper discusses BC Hydro’s M&V program and the M&V results from industrial projects. Several case history studies will also be reviewed. The case studies reviewed involve aeration motor speed controls upgrade, steam turbine controls upgrade and natural gas liquid pump speed controls upgrade.

Lau, K.; Henderson, G.; Hebert, D.

2007-05-01T23:59:59.000Z

100

Experimental verification of quantum computations  

E-Print Network (OSTI)

Quantum computers are expected to offer substantial speedups over their classical counterparts and to solve problems that are intractable for classical computers. Beyond such practical significance, the concept of quantum computation opens up new fundamental questions, among them the issue whether or not quantum computations can be certified by entities that are inherently unable to compute the results themselves. Here we present the first experimental verification of quantum computations. We show, in theory and in experiment, how a verifier with minimal quantum resources can test a significantly more powerful quantum computer. The new verification protocol introduced in this work utilizes the framework of blind quantum computing and is independent of the experimental quantum-computation platform used. In our scheme, the verifier is only required to generate single qubits and transmit them to the quantum computer. We experimentally demonstrate this protocol using four photonic qubits and show how the verifier can test the computer's ability to perform measurement-based quantum computations.

Stefanie Barz; Joseph F. Fitzsimons; Elham Kashefi; Philip Walther

2013-08-30T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

FUPWG Purpose, Policies, and Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

102

FUPWG Purpose, Policies, and Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL UTILITY PARTNERSHIP WORKING GROUP FEDERAL UTILITY PARTNERSHIP WORKING GROUP Purpose, Policies and Operations Draft - For Review and Comment Only Table of Contents: I. Introduction II. Membership III. Steering Committee Membership and Responsibilities IV. Meetings V. Meeting Content VI. Future Direction Appendices: 1) Vision Statement 2) Edison Electric Institute (EEI) Commitment Statement 3) FUPWG Members 4) List of Steering Committee Members 5) List of Previous and planned Future Meetings 6) List of Topics Addressed By FUPWG 7) Speaker Guidelines 8) Host Responsibilities 1 Last Updated 7/22/2010 I. Introduction The Federal Utility Partnership Working Group (FUPWG or Working Group) was initiated by

103

Input apparatus for dynamic signature verification systems  

DOE Patents (OSTI)

The disclosure relates to signature verification input apparatus comprising a writing instrument and platen containing piezoelectric transducers which generate signals in response to writing pressures.

EerNisse, Errol P. (Albuquerque, NM); Land, Cecil E. (Albuquerque, NM); Snelling, Jay B. (Albuquerque, NM)

1978-01-01T23:59:59.000Z

104

NETL: Carbon Storage - Monitoring, Verification, and Accounting...  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Carbon Storage Monitoring, Verification, and Accounting (MVA) Focus Area An MVA program is designed to confirm permanent storage of carbon dioxide (CO2) in geologic formations...

105

National Energy Efficiency Evaluation, Measurement and Verification...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements Title National Energy Efficiency...

106

Compliance Verification Paths for Residential and Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification Paths for Residential and Commercial Energy Codes Conformity assessment is a term used to describe the processes followed to demonstrate that a product, service,...

107

National Energy Efficiency Evaluation, Measurement and Verification...  

NLE Websites -- All DOE Office Websites (Extended Search)

65E ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and...

108

Energy Efficiency Measurement & Verification in South Africa  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts Media Contacts Energy Efficiency Measurement & Verification in South Africa Speaker(s): Xiaohua Xia Date: December 17, 2012 - 12:00pm Location: 90-3122 Seminar...

109

Formal verification in a commercial setting  

Science Conference Proceedings (OSTI)

This tutorial addresses the following questions:¿ why do formal verification?¿ who is doing it today?¿ what are they doing?¿ how are they doing it?¿ what about the future?

R. P. Kurshan

1997-06-01T23:59:59.000Z

110

Efficient formal verification of bounds of linear programs  

Science Conference Proceedings (OSTI)

One of the challenging problems in the formalization of mathematics is a formal verification of numerical computations. Many theorems rely on numerical results, the verification of which is necessary for producing complete formal proofs. The formal verification ...

Alexey Solovyev; Thomas C. Hales

2011-07-01T23:59:59.000Z

111

Hydrologic Verification: A Call for Action and Collaboration  

Science Conference Proceedings (OSTI)

Traditionally, little attention has been focused on the systematic verification of operational hydrologic forecasts. This paper summarizes the results of forecast verification from 15 river basins in the United States. The verification scores for ...

Edwin Welles; Soroosh Sorooshian; Gary Carter; Billy Olsen

2007-04-01T23:59:59.000Z

112

SU?E?J?152: Fluoroscopic Treatment Verification for Gated Stereotactic Body Radiation Therapy of a Tumor Located Near the Dome of the Liver: A  

Science Conference Proceedings (OSTI)

Purpose: To describe a method using pretreatment and intrafraction fluoroscopic verification of the gated treatment of a liver lesion located near the diaphragm. Methods: A 74?year?old female patient

2013-01-01T23:59:59.000Z

113

ORO Verification of Employment Tracking System(VETS) PIA, Oak...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO...

114

The Office of Nuclear Verification | National Nuclear Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

at NNSA Blog The Office of Nuclear Verification Home > About Us > Our Programs > Nonproliferation > Nonproliferation & International Security > The Office of Nuclear Verification...

115

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

116

Review of the Los Alamos National Laboratory Implementation Verification Review at Technical Area-55  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos National Laboratory Implementation Verification Review at Technical Area-55 May 2011 July 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Introduction ............................................................................................................................................ 1

117

Review of the Pantex Plant Implementation Verification Review Processes, February 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Pantex Plant Implementation Verification Review Processes February 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1

118

Review of Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2, November 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2 May 2011 November 2011 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope..................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 2

119

Software Verification and Validation Test Report for the HEPA filter Differential Pressure Fan Interlock System  

Science Conference Proceedings (OSTI)

The HEPA Filter Differential Pressure Fan Interlock System PLC ladder logic software was tested using a Software Verification and Validation (V&V) Test Plan as required by the ''Computer Software Quality Assurance Requirements''. The purpose of his document is to report on the results of the software qualification.

ERMI, A.M.

2000-09-05T23:59:59.000Z

120

Review of the Pantex Plant Implementation Verification Review Processes, February 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Pantex Plant Implementation Verification Review Processes February 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Review of the Los Alamos National Laboratory Implementation Verification Review at Technical Area-55  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory Implementation Verification Review at Technical Area-55 May 2011 July 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Introduction ............................................................................................................................................ 1

122

Review of the Nevada National Security Site Implementation Verification Review Processes, March 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Nevada National Security Site the Nevada National Security Site Implementation Verification Review Processes March 2012 Office of Safety and Emergency Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................. 1 3.0 Scope ....................................................................................................................................................... 1

123

Review of Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2, November 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Verification Review Processes at the Idaho Site - Phase 1 of 2 May 2011 November 2011 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope..................................................................................................................................................... 1 3.0 Background ........................................................................................................................................... 2

124

Review of the Richland Operations Office Oversight of Implementation Verification Review Processes, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight Review Oversight Review of the Richland Operations Office Oversight of Implementation Verification Review Processes November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope....................................................................................................................................................... 2

125

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

126

Stakeholder Engagement and Outreach: Perspectives: Personal Interviews With  

Wind Powering America (EERE)

Perspectives: Perspectives: Personal Interviews With Wind Industry Stakeholders, Pioneers, Advocates, and Electric Cooperatives Wind Powering America interviewed various industry stakeholders to show different perspectives of wind energy's value. Wind Powering America also interviewed wind pioneers to examine how they have laid the groundwork for today's U.S. wind energy market. These interviews are one of a kind and provide an insider view of how the wind industry has evolved and is influenced today. Wind Powering America is also interviewing Native Americans to examine their experiences and future plans. Finally, included, are wind power advocate interviews, electric cooperative interviews, and public power pioneer interviews. Public Power Wind Pioneer Interviews Photo of Patricia Bigner and Phil Dougherty

127

ICDF Complex Waste Profile and Verification Sample Guidance  

Science Conference Proceedings (OSTI)

This guidance document will assist waste generators who characterize waste streams destined for disposal at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) Complex. The purpose of this document is to develop a conservative but appropriate way to (1) characterize waste for entry into the ICDF; (2) ensure compliance with the waste acceptance criteria; and (3) facilitate disposal at the ICDF landfill or evaporation pond. In addition, this document will establish the waste verification process used by ICDF personnel to ensure that untreated waste meets applicable ICDF acceptance limits

W. M. Heileson

2006-10-01T23:59:59.000Z

128

Code Verification of the HIGRAD Computational Fluid Dynamics Solver  

DOE Green Energy (OSTI)

The purpose of this report is to outline code and solution verification activities applied to HIGRAD, a Computational Fluid Dynamics (CFD) solver of the compressible Navier-Stokes equations developed at the Los Alamos National Laboratory, and used to simulate various phenomena such as the propagation of wildfires and atmospheric hydrodynamics. Code verification efforts, as described in this report, are an important first step to establish the credibility of numerical simulations. They provide evidence that the mathematical formulation is properly implemented without significant mistakes that would adversely impact the application of interest. Highly accurate analytical solutions are derived for four code verification test problems that exercise different aspects of the code. These test problems are referred to as: (i) the quiet start, (ii) the passive advection, (iii) the passive diffusion, and (iv) the piston-like problem. These problems are simulated using HIGRAD with different levels of mesh discretization and the numerical solutions are compared to their analytical counterparts. In addition, the rates of convergence are estimated to verify the numerical performance of the solver. The first three test problems produce numerical approximations as expected. The fourth test problem (piston-like) indicates the extent to which the code is able to simulate a 'mild' discontinuity, which is a condition that would typically be better handled by a Lagrangian formulation. The current investigation concludes that the numerical implementation of the solver performs as expected. The quality of solutions is sufficient to provide credible simulations of fluid flows around wind turbines. The main caveat associated to these findings is the low coverage provided by these four problems, and somewhat limited verification activities. A more comprehensive evaluation of HIGRAD may be beneficial for future studies.

Van Buren, Kendra L. [Los Alamos National Laboratory; Canfield, Jesse M. [Los Alamos National Laboratory; Hemez, Francois M. [Los Alamos National Laboratory; Sauer, Jeremy A. [Los Alamos National Laboratory

2012-05-04T23:59:59.000Z

129

Formal verification of practical MPI programs  

Science Conference Proceedings (OSTI)

This paper considers the problem of formal verification of MPI programs operating under a fixed test harness for safety properties without building verification models. In our approach, we directly model-check the MPI/C source code, executing its interleavings ... Keywords: distributed programming, dynamic partial order reduction, message passing interface, model checking, mpi

Anh Vo; Sarvani Vakkalanka; Michael DeLisi; Ganesh Gopalakrishnan; Robert M. Kirby; Rajeev Thakur

2009-02-01T23:59:59.000Z

130

Integrated safety management system verification: Volume 2  

Science Conference Proceedings (OSTI)

Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalization of an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR, 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System (ISMS). Guidance and expectations have been provided to PNNL by incorporation into the operating contract (Contract DE-ACM-76FL0 1830) and by letter. The contract requires that the contractor submit a description of their ISMS for approval by DOE. PNNL submitted their proposed Safety Management System Description for approval on November 25,1997. RL tentatively approved acceptance of the description pursuant to a favorable recommendation from this review. The Integrated Safety Management System Verification is a review of the adequacy of the ISMS description in fulfilling the requirements of the DEAR and the DOE Policy. The purpose of this review is to provide the Richland Operations Office Manager with a recommendation for approval of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and to verify the extent and maturity of ISMS implementation within the Laboratory. Further the review will provide a model for other DOE laboratories managed by the Office of Assistant Secretary for Energy Research.

Christensen, R.F.

1998-08-10T23:59:59.000Z

131

Microsoft Word - DRAFT CRB Interview Guidance.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certification Review Board Interview Guidance Certification Review Board Interview Guidance 1 Background and Scope: The Certification Review Board (CRB) conducts interviews for Level 3 and 4 certification candidates, unless otherwise waived by the CRB (see Appendix C of the March, 2009 PMCDP Certification and Equivalency Guidelines ). These interviews allow aspiring Level 3 and 4 federal project directors to demonstrate verbally their mastery of the requisite leadership expertise, to include the expert management of project resources and accountability for project successes and failures, needed to manage high-dollar, mission-critical DOE projects effectively. Interview Structure and Process: Candidate interviews are conducted after the certification candidate's profile has been provisionally

132

Integrated safety management system verification: Volume 1  

SciTech Connect

Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These activities are normally conducted during a pre-visit trip to the site. The Team recommends approval of the Integrated Safety Management System Description subject to the resolution of the Areas of Concerns noted here.

Christensen, R.F.

1998-08-12T23:59:59.000Z

133

Solar Industry At Work: Video Interview with Alta Devices' Laila...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos June 6, 2012 - 12:07pm Addthis Laila...

134

Hierarchical Verification for Increasing Performance in Reliable Processors  

Science Conference Proceedings (OSTI)

Dynamic verification using the checker processor introduces severe degradation in performance unless the checker is as fast as the main processor core. Without widening the checker's bandwidth, we propose an active verification management (AVM) approach ... Keywords: Active verification management, Correctness non-critically, Fault tolerance, Filter checker, Hierarchical verification, Performance

Joonhyuk Yoo; Manoj Franklin

2008-06-01T23:59:59.000Z

135

Secure position verification for wireless sensor networks in noisy channels  

Science Conference Proceedings (OSTI)

Position verification in wireless sensor networks (WSNs) is quite tricky in presence of attackers (malicious sensor nodes), who try to break the verification protocol by reporting their incorrect positions (locations) during the verification stage. In ... Keywords: 3? limit, distance estimation, distributed protocol, location verification, quantiles, wireless networks

Partha Sarathi Mandal; Anil K. Ghosh

2011-07-01T23:59:59.000Z

136

Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE O 425.1D, VERIFICATION OF READINESS TO START UP DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness review (RR), 2) determining the startup authorization authority (SAA), and 3) the startup notification report. In the second section we will discuss 1) the requirements applicable to DOE ORRs and DOE RAs, and 2) the core requirements. In the third section we will discuss the 1) requirements for DOE field element and headquarters line management oversight of the startup or restart process, 2) requirements for the records management program, and

137

NREL: Wind Research - Field Verification Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Verification Project Field Verification Project The mission of the Field Verification Project (FVP) was to enable U.S. industry to complete the research, testing, and field verification needed to fully develop advanced wind energy technologies that lead the world in cost-effectiveness and reliability. The project, completed in 2003, included cost-shared research with industry partners to lead to the development of advanced technology wind turbines and support for projects that verify performance of wind turbine technologies in actual operational applications. FVP provided small wind turbine (<=100 kW) manufacturers with opportunities to operate and monitor their turbines under a range of distributed power applications and environments throughout the United States. This experience helped U.S. companies validate and improve the

138

Measurement and Verification for Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measurement and Verification for Measurement and Verification for Demand Response Prepared for the National Forum on the National Action Plan on Demand Response: Measurement and Verification Working Group AUTHORS: Miriam L. Goldberg & G. Kennedy Agnew-DNV KEMA Energy and Sustainability National Forum of the National Action Plan on Demand Response Measurement and Verification for Demand Response was developed to fulfill part of the Implementation Proposal for The National Action Plan on Demand Response, a report to Congress jointly issued by the U.S. Department of Energy (DOE) and the Federal Energy Regulatory Commission (FERC) in June 2011. Part of that implementation proposal called for a "National Forum" on demand response to be conducted by DOE and FERC. Given that demand response has matured, DOE and FERC decided that a "virtual" project

139

Measurement and Verification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measurement and Verification Measurement and Verification Measurement and Verification October 16, 2013 - 4:43pm Addthis Photo of a man with a clipboard and measuring tools standing in front of an open energy panel box. A National Park Service energy manager checks an energy management system at the Zion National Park Visitor Center. Measurement and verification (M&V) play a vital role in renewable energy projects. M&V verifies verify that renewable energy technologies successfully meet the energy generation or savings requirements as specified by the agency and the system design. Federal sustainable building guidelines require M&V systems for sustainable building projects and the use of M&V data for benchmarking systems. However, these systems deliver value well beyond regulatory compliance.

140

Lessons Learned from Independent Verification Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demonstration Demonstration Oak Ridge Institute for Science and Education - Independent Verification Lessons Learned IV - performed at nine DOE sites from 2004 to 2008 Page 1 of 2 Oak Ridge Institute for Science and Education Multiple Sites Lessons Learned from Independent Verification Activities Challenge The Department of Energy clears property from radiological control after the property has been demonstrated to meet the Department's stringent radiation protection requirements. Radiological surveys are used to demonstrate compliance with the requirements. Independent verification (IV) activities are conducted by an independent third party as a quality check on radiological surveys procedures and practices. The Oak Ridge Institute for Science and Education (ORISE) performs independent verification for the Department. In this lessons learned report, ORISE summarizes their

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Runtime verification of object lifetime specifications  

E-Print Network (OSTI)

This thesis reports on the implementation of a runtime verification system for object lifetime specifications. This system is used to explore and evaluate the expressiveness object lifetime specifications. Object lifetime ...

Benjamin, Zev (Zev A.)

2009-01-01T23:59:59.000Z

142

Seismic design verification of LMFBR structures  

SciTech Connect

The report provides an assessment of the seismic design verification procedures currently used for nuclear power plant structures, a comparison of dynamic test methods available, and conclusions and recommendations for future LMFB structures.

1977-07-01T23:59:59.000Z

143

Automatic verification of competitive stochastic systems  

Science Conference Proceedings (OSTI)

We present automatic verification techniques for the modelling and analysis of probabilistic systems that incorporate competitive behaviour. These systems are modelled as turn-based stochastic multi-player games, in which the players can either collaborate ...

Taolue Chen; Vojt?ch Forejt; Marta Kwiatkowska; David Parker; Aistis Simaitis

2012-03-01T23:59:59.000Z

144

Hierarchical layout verification for submicron designs  

Science Conference Proceedings (OSTI)

In this paper we present the program HEXDRC for hierarchical circuit extraction and design rule check. The main problem for hierarchical layout verification is to handle interactions between different cells effectively. The kind of interactions however ...

W. Meier

1990-03-01T23:59:59.000Z

145

Intercomparison of Spatial Forecast Verification Methods  

Science Conference Proceedings (OSTI)

Advancements in weather forecast models and their enhanced resolution have led to substantially improved and more realistic-appearing forecasts for some variables. However, traditional verification scores often indicate poor performance because ...

Eric Gilleland; David Ahijevych; Barbara G. Brown; Barbara Casati; Elizabeth E. Ebert

2009-10-01T23:59:59.000Z

146

The Severe Hazards Analysis and Verification Experiment  

Science Conference Proceedings (OSTI)

During the springs and summers of 2006 through 2008, scientists from the National Severe Storms Laboratory and students from the University of Oklahoma have conducted an enhanced severe-storm verification effort. The primary goal for the Severe ...

Kiel L. Ortega; Travis M. Smith; Kevin L. Manross; Angelyn G. Kolodziej; Kevin A. Scharfenberg; Arthur Witt; Jonathan J. Gourley

2009-10-01T23:59:59.000Z

147

A relational framework for bounded program verification  

E-Print Network (OSTI)

All software verification techniques, from theorem proving to testing, share the common goal of establishing a program's correctness with both (1) a high degree of confidence and (2) a low cost to the user, two criteria ...

Dennis, Gregory D. (Gregory David), 1980-

2009-01-01T23:59:59.000Z

148

A General Framework for Forecast Verification  

Science Conference Proceedings (OSTI)

A general framework for forecast verification based on the joint distribution of forecasts and observations is described. For further elaboration of the framework, two factorizations of the joint distribution are investigated: 1) the calibration-...

Allan H. Murphy; Robert L. Winkler

1987-07-01T23:59:59.000Z

149

Formal Verification of Safety Automation Logic Designs  

E-Print Network (OSTI)

In safety critical processes, especially in nuclear power plants, the new digitalized automation (I&C) systems have brought out new needs for safety evaluation. The programmable digital logic controllers can perform complicated control tasks and, thus, their comprehensive verification against safety requirements is a difficult task. Model checking is a promising approach that enables complete verification of a logic design when a finite state machine model of the control logic is available. The paper describes the use of model checking for the verification of an arc protection system and summarizes experiences of utilizing model checking in automation design and verification. For the verification of the arc protection system, it was necessary to model the overall design of the system and its operation environment. The environment model could be kept relatively simple while covering the essential behaviour of the environment. The results show that it is possible to reliably verify the presence of a desired or the absence of an undesired behaviour of the system. The possibility of complete verification makes model checking different from simulation based testing where only selected schemes can be simulated and one can never be sure that all the possible sequences are examined.

Janne Valkonen; Matti Koskimies; Kim Björkman; Keijo Heljanko; Ilkka Niemelä; Jari J. Hämäläinen

2009-01-01T23:59:59.000Z

150

Completing the automated verification of a small hypervisor - assembler code verification  

Science Conference Proceedings (OSTI)

In [1] the almost complete formal verification of a small hypervisor with the automated C code verifier VCC [2] was reported: the correctness of the C portions of the hypervisor and of the guest simulation was established; the verification of the assembler ...

Wolfgang Paul; Sabine Schmaltz; Andrey Shadrin

2012-10-01T23:59:59.000Z

151

DOE handbook: Integrated safety management systems (ISMS) verification team leader`s handbook  

SciTech Connect

The primary purpose of this handbook is to provide guidance to the ISMS verification Team Leader and the verification team in conducting ISMS verifications. The handbook describes methods and approaches for the review of the ISMS documentation (Phase I) and ISMS implementation (Phase II) and provides information useful to the Team Leader in preparing the review plan, selecting and training the team, coordinating the conduct of the verification, and documenting the results. The process and techniques described are based on the results of several pilot ISMS verifications that have been conducted across the DOE complex. A secondary purpose of this handbook is to provide information useful in developing DOE personnel to conduct these reviews. Specifically, this handbook describes methods and approaches to: (1) Develop the scope of the Phase 1 and Phase 2 review processes to be consistent with the history, hazards, and complexity of the site, facility, or activity; (2) Develop procedures for the conduct of the Phase 1 review, validating that the ISMS documentation satisfies the DEAR clause as amplified in DOE Policies 450.4, 450.5, 450.6 and associated guidance and that DOE can effectively execute responsibilities as described in the Functions, Responsibilities, and Authorities Manual (FRAM); (3) Develop procedures for the conduct of the Phase 2 review, validating that the description approved by the Approval Authority, following or concurrent with the Phase 1 review, has been implemented; and (4) Describe a methodology by which the DOE ISMS verification teams will be advised, trained, and/or mentored to conduct subsequent ISMS verifications. The handbook provides proven methods and approaches for verifying that commitments related to the DEAR, the FRAM, and associated amplifying guidance are in place and implemented in nuclear and high risk facilities. This handbook also contains useful guidance to line managers when preparing for a review of ISMS for radiological facilities, non-nuclear, or non-Defense Programs facilities. DOE line managers are encouraged to tailor the procedures described in this handbook for ISMS verifications for low risk facilities.

NONE

1999-06-01T23:59:59.000Z

152

Our Purpose and Direction Forestry Commission Wales  

E-Print Network (OSTI)

Corporate Our Purpose and Direction Forestry Commission Wales: Corporate Plan 2012 to 2015 #12;Ministers Foreword I am very pleased to be providing the foreword for `Our purpose and direction beyond the 50-year lifespan of Woodlands for Wales. Our Purpose and Direction John Griffiths AM Minister

153

Monitoring and verification R&D  

SciTech Connect

The 2010 Nuclear Posture Review (NPR) report outlined the Administration's approach to promoting the agenda put forward by President Obama in Prague on April 5, 2009. The NPR calls for a national monitoring and verification R&D program to meet future challenges arising from the Administration's nonproliferation, arms control and disarmament agenda. Verification of a follow-on to New START could have to address warheads and possibly components along with delivery capabilities. Deeper cuts and disarmament would need to address all of these elements along with nuclear weapon testing, nuclear material and weapon production facilities, virtual capabilities from old weapon and existing energy programs and undeclared capabilities. We only know how to address some elements of these challenges today, and the requirements may be more rigorous in the context of deeper cuts as well as disarmament. Moreover, there is a critical need for multiple options to sensitive problems and to address other challenges. There will be other verification challenges in a world of deeper cuts and disarmament, some of which we are already facing. At some point, if the reductions process is progressing, uncertainties about past nuclear materials and weapons production will have to be addressed. IAEA safeguards will need to continue to evolve to meet current and future challenges, and to take advantage of new technologies and approaches. Transparency/verification of nuclear and dual-use exports will also have to be addressed, and there will be a need to make nonproliferation measures more watertight and transparent. In this context, and recognizing we will face all of these challenges even if disarmament is not achieved, this paper will explore possible agreements and arrangements; verification challenges; gaps in monitoring and verification technologies and approaches; and the R&D required to address these gaps and other monitoring and verification challenges.

Pilat, Joseph F [Los Alamos National Laboratory; Budlong - Sylvester, Kory W [Los Alamos National Laboratory; Fearey, Bryan L [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

154

NREL: Wind Research - New England Interview: Stephan Wollenburg...  

NLE Websites -- All DOE Office Websites (Extended Search)

Interview: Stephan Wollenburg, Green Energy Program Director of Energy Consumers Alliance of New England January 14, 2013 The Energy Consumers Alliance of New England (ECANE)...

155

Segment of Smithsonian Video history interview - December 1987  

NLE Websites -- All DOE Office Websites (Extended Search)

1 In 1987, Stanley Goldberg, consulting historian for the Smithsonian's National Museum of American History conducted interviews in the Kennedy Maxwell Productions Studio located...

156

Employee Exit Interviews--An Important But Frequently Overlooked ...  

Science Conference Proceedings (OSTI)

... and efficiently administered exit interview program can go a long way toward ... If the employer has agreed to waive its rights in any invention and no prior ...

157

Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2  

E-Print Network (OSTI)

The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

Parsons, J E

2000-01-01T23:59:59.000Z

158

Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2  

SciTech Connect

The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

PARSONS, J.E.

2000-07-15T23:59:59.000Z

159

Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site, January 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site May 2011 January 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

160

Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

Science Conference Proceedings (OSTI)

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

Kent Norris

2010-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

NREL: Wind Research - Regional Field Verification  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Verification Field Verification The Regional Field Verification (RFV) project, completed in 2007, focused on regional issues and opportunities and tested turbines to gain operational knowledge that could be applied nationwide. The RFV objectives were to: Support industry needs for gaining initial field operation experience with small wind turbines, and verify the performance, reliability, maintainability, and cost of small wind turbines in diverse applications. Expand opportunities for wind energy in new regions of the United States by tailoring projects to meet unique regional requirements, and document and communicate the experience from these projects for the benefit of others in the wind power development community and rural utilities. Through a competitive solicitation in 2001-2002, NREL selected one

162

Electric Power Research Institute Utility Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report provides an overview of the DOE EPRI Wind Turbine Verification Program (TVP) and the Turbine Verification and Technology Transfer Projects funded by the program between 1994 and 2004.

2008-12-22T23:59:59.000Z

163

Vehicle Modeling and Verification of CNG-Powered Transit Buses  

E-Print Network (OSTI)

Modeling and Verification of CNG-Powered Transit BusesModeling and Verification of CNG-Powered Transit Buses.Modeling and Veri?cation of CNG-Powered Transit Buses J.K.

Hedrick, J. K.; Ni, A.

2004-01-01T23:59:59.000Z

164

Generalized Exponential Markov and Model Output Statistics: A Comparative Verification  

Science Conference Proceedings (OSTI)

We performed a comparative verification of Model Output Statistics (MOS) against Generalized Exponential Markov (GEM), a single station forecasting technique which uses only the surface observation and climatology as input. The verification was ...

Thomas J. Perrone; Robert G. Miller

1985-09-01T23:59:59.000Z

165

Exploration of small enrollment speaker verification on handheld devices  

E-Print Network (OSTI)

This thesis explores the problem of robust speaker verification for handheld devices under the context of extremely limited training data. Although speaker verification technology is an area of great promise for security ...

Woo, Ram H. (Ram Han)

2005-01-01T23:59:59.000Z

166

A Tutorial on Text-Independent Speaker Verification  

E-Print Network (OSTI)

This paper presents an overview of a state-of-the-art text-independent speaker verification system. First, an introduction proposes a modular scheme of the training and test phases of a speaker verification system. Then, ...

Bimbot, Frederic

167

Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent Oversight Review of the Independent Oversight Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes May 2011 January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 2

168

Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review of the Independent Oversight Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes May 2011 January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 2

169

Battery Technology Life Verification Test Manual Revision 1  

SciTech Connect

The purpose of this Technology Life Verification Test (TLVT) Manual is to help guide developers in their effort to successfully commercialize advanced energy storage devices such as battery and ultracapacitor technologies. The experimental design and data analysis discussed herein are focused on automotive applications based on the United States Advanced Battery Consortium (USABC) electric vehicle, hybrid electric vehicle, and plug-in hybrid electric vehicle (EV, HEV, and PHEV, respectively) performance targets. However, the methodology can be equally applied to other applications as well. This manual supersedes the February 2005 version of the TLVT Manual (Reference 1). It includes criteria for statistically-based life test matrix designs as well as requirements for test data analysis and reporting. Calendar life modeling and estimation techniques, including a user’s guide to the corresponding software tool is now provided in the Battery Life Estimator (BLE) Manual (Reference 2).

Jon P. Christophersen

2012-12-01T23:59:59.000Z

170

MACCS2 development and verification efforts  

SciTech Connect

MACCS2 represents a major enhancement of the capabilities of its predecessor MACCS, the MELCOR Accident Consequence Code System. MACCS, released in 1987, was developed to estimate the potential impacts to the surrounding public of severe accidents at nuclear power plants. The principal phenomena considered in MACCS/MACCS2 are atmospheric transport and deposition under time-variant meteorology, short-term and long-term mitigative actions and exposure pathways, deterministic and stochastic health effects, and economic costs. MACCS2 was developed as a general-purpose analytical tool applicable to diverse reactor and nonreactor facilities. The MACCS2 package includes three primary enhancements: (1) a more flexible emergency response model, (2) an expanded library of radionuclides, and (3) a semidynamic food-chain model. In addition, errors that had been identified in MACCS version1.5.11.1 were corrected, including an error that prevented the code from providing intermediate-phase results. MACCS2 version 1.10 beta test was released to the beta-test group in May, 1995. In addition, the University of New Mexico (UNM) has completed an independent verification study of the code package. Since the beta-test release of MACCS2 version 1.10, a number of minor errors have been identified and corrected, and a number of enhancements have been added to the code package. The code enhancements added since the beta-test release of version 1.10 include: (1) an option to allow the user to input the {sigma}{sub y} and {sigma}{sub z} plume expansion parameters in a table-lookup form for incremental downwind distances, (2) an option to define different initial dimensions for up to four segments of a release, (3) an enhancement to the COMIDA2 food-chain model preprocessor to allow the user to supply externally calculated tables of tritium food-chain dose per unit deposition on farmland to support analyses of tritium releases, and (4) the capability to calculate direction-dependent doses.

Young, M.; Chanin, D.

1997-03-01T23:59:59.000Z

171

Speaker verification under degraded condition: a perceptual study  

Science Conference Proceedings (OSTI)

This study analyzes the effect of degradation on human and automatic speaker verification (SV) tasks. The perceptual test is conducted by the subjects having knowledge about speaker verification. An automatic SV system is developed using the Mel-frequency ... Keywords: Degraded condition, Human vs automatic, Speaker information, Speaker verification

Gayadhar Pradhan; S. R. Prasanna

2011-12-01T23:59:59.000Z

172

A tutorial on text-independent speaker verification  

Science Conference Proceedings (OSTI)

This paper presents an overview of a state-of-the-art text-independent speaker verification system. First, an introduction proposes a modular scheme of the training and test phases of a speaker verification system. Then, the most commonly speech parameterization ... Keywords: Gaussian mixture modeling, cepstral analysis, speaker verification, text-independent

Frédéric Bimbot; Jean-François Bonastre; Corinne Fredouille; Guillaume Gravier; Ivan Magrin-Chagnolleau; Sylvain Meignier; Teva Merlin; Javier Ortega-García; Dijana Petrovska-Delacrétaz; Douglas A. Reynolds

2004-01-01T23:59:59.000Z

173

Test Purpose Generation for Timed Protocol Testing  

Science Conference Proceedings (OSTI)

Test purposes are requirements, usually constructed by hand, which aim at testing critical properties on implementations. These ones are then used by testing methods to generate test cases. Writing them manually is a heavy task, this is why we propose ... Keywords: Timed protocols, conformance testing, test purpose, testability

Sébastien Salva; Antoine Rollet

2009-07-01T23:59:59.000Z

174

Our purpose and direction 2011 to 2014  

E-Print Network (OSTI)

Corporate Our purpose and direction summary 2011 to 2014 #12;Forestry Commission Wales 3 Our direction Our work is guided by Woodlands for Wales, WAG's 50 year strategy for woodlands and trees, which and environmental public benefits. 2 Forestry Commission Wales Welcome to the summary of Our Purpose and Direction

175

Server Security Policy 1.0 Purpose  

E-Print Network (OSTI)

Server Security Policy COE­SSP­01 1.0 Purpose The purpose of this policy is to establish standards configurations must be in accordance with approved College guidelines to ensure a significant level of security Wrappers or other security mechanisms. · The most recent security patches must be installed on the system

Demirel, Melik C.

176

Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan  

SciTech Connect

The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000.

CLARK, D.L.

1999-08-09T23:59:59.000Z

177

Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

Kent Norris

2010-03-01T23:59:59.000Z

178

Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

Kent Norris

2009-09-01T23:59:59.000Z

179

Gait verification using knee acceleration signals  

Science Conference Proceedings (OSTI)

A novel gait recognition method for biometric applications is proposed. The approach has the following distinct features. First, gait patterns are determined via knee acceleration signals, circumventing difficulties associated with conventional vision-based ... Keywords: Biometrics, Gait analysis, Identity verification, Physiological signal processing

L. W. Hang; C. Y. Hong; C. W. Yen; D. J. Chang; M. L. Nagurka

2011-11-01T23:59:59.000Z

180

Taximeter verification using imprecise data from GPS  

Science Conference Proceedings (OSTI)

Until recently, local governments in Spain were using machines with rolling cylinders for testing and verification of taximeters. However, the tyres condition can lead to errors in the process and the mechanical construction of the test equipment is ... Keywords: Fuzzy fitness function, GPS, Genetic fuzzy systems, Metrology, Vague data

José Villar; Adolfo Otero; José Otero; Luciano Sánchez

2009-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Verification Techniques for System-Level Design  

Science Conference Proceedings (OSTI)

This book will explain how to verify SoC logic designs using "formal" and "semi-formal" verification techniques. The critical issue to be addressed is whether the functionality of the design is the one that the designers intended. Simulation has been ... Keywords: Circuits, Electricity, Microelectronics

Masahiro Fujita; Indradeep Ghosh; Mukul Prasad

2007-10-01T23:59:59.000Z

182

Pattern Language Verification in Model Driven Design  

Science Conference Proceedings (OSTI)

This paper addresses the problem of verifying the application of a Pattern Language in a design that is built based upon the patterns of the language in a model-driven approach. We propose a process named Pattern Language Verifier (PLV) which consists ... Keywords: Model Driven Engineering, Pattern Language Verification

Bahman Zamani, Greg Butler

2013-07-01T23:59:59.000Z

183

Towards Integrated Verification of Timed Transition Models  

Science Conference Proceedings (OSTI)

This paper describes an attempt to combine theorem proving and model-checking to formally verify real-time systems in a discrete time setting. The Timed Automata Modeling Environment (TAME) has been modified to provide a formal model for Time Transition ... Keywords: PVS, Real-time, SAL, equivalence verification, model reduction, model-checking, theorem proving

Mark Lawford; Vera Pantelic; Hong Zhang

2006-04-01T23:59:59.000Z

184

Automatic verification for interactive graphical programs  

Science Conference Proceedings (OSTI)

Modern software applications come with interactive graphical displays. In the past, verification efforts for such programs have usually ignored the I/O aspects of programs and focused instead on their core functionality. This approach leaves open the ... Keywords: ACL2, Dracula, interactive graphical programs

Carl Eastlund; Matthias Felleisen

2009-05-01T23:59:59.000Z

185

Handling Global Conditions in Parameterized System Verification  

Science Conference Proceedings (OSTI)

We consider symbolic verification for a class of parameterized systems, where a system consists of a linear array of processes, and where an action of a process may in general be guarded by both local conditions restricting the state of the process about ...

Parosh Aziz Abdulla; Ahmed Bouajjani; Bengt Jonsson; Marcus Nilsson

1999-07-01T23:59:59.000Z

186

Uncertainty and Inference for Verification Measures  

Science Conference Proceedings (OSTI)

When a forecast is assessed, a single value for a verification measure is often quoted. This is of limited use, as it needs to be complemented by some idea of the uncertainty associated with the value. If this uncertainty can be quantified, it is ...

Ian T. Jolliffe

2007-06-01T23:59:59.000Z

187

UN-REDD Workshop: Monitoring, Assessment and Verification | Open Energy  

Open Energy Info (EERE)

UN-REDD Workshop: Monitoring, Assessment and Verification UN-REDD Workshop: Monitoring, Assessment and Verification Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UN-REDD Workshop: Monitoring, Assessment and Verification Agency/Company /Organization: United Nations Environment Programme, Food and Agriculture Organization of the United Nations, United Nations Development Programme Sector: Land Focus Area: Forestry Topics: GHG inventory, Policies/deployment programs, Resource assessment Resource Type: Workshop Website: www.un-redd.org/UNREDDProgramme/InternationalSupport/MeasurementReport UN-REDD Workshop: Monitoring, Assessment and Verification Screenshot References: UN-REDD Workshop: Monitoring, Assessment and Verification[1] Background "The specific objectives of the workshop were to develop a roadmap with

188

Monitoring, Verification and Reporting: Improving Compliance Within Energy  

Open Energy Info (EERE)

Monitoring, Verification and Reporting: Improving Compliance Within Energy Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Jump to: navigation, search Tool Summary Name: Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Agency/Company /Organization: International Energy Agency Sector: Energy Focus Area: Energy Efficiency Topics: GHG inventory, Policies/deployment programs Resource Type: Guide/manual Website: www.iea.org/papers/pathways/monitoring.pdf Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Screenshot References: Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs[1] This document includes: A brief overview of MVE in the context of S&L programmes.

189

The Office of Nuclear Verification | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Nuclear Verification | National Nuclear Security Nuclear Verification | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The Office of Nuclear Verification Home > About Us > Our Programs > Nonproliferation > Nonproliferation & International Security > The Office of Nuclear Verification The Office of Nuclear Verification

190

The AdaptiV Approach to Verification of Adaptive Systems  

SciTech Connect

Adaptive systems are critical for future space and other unmanned and intelligent systems. Verification of these systems is also critical for their use in systems with potential harm to human life or with large financial investments. Due to their nondeterministic nature and extremely large state space, current methods for verification of software systems are not adequate to provide a high level of assurance. The combination of stabilization science, high performance computing simulations, compositional verification and traditional verification techniques, plus operational monitors, provides a complete approach to verification and deployment of adaptive systems that has not been used before. This paper gives an overview of this approach.

Rouff, Christopher [Lockheed Martin Corporation; Buskens, Richard [Lockheed Martin Corporation; Pullum, Laura L [ORNL; Cui, Xiaohui [ORNL; Hinchey, Mike [Lero – The Irish Software Engineering Research Centre

2012-01-01T23:59:59.000Z

191

A multi-purpose language processing laboratory  

Science Conference Proceedings (OSTI)

This paper describes the design and implementation of a tool for creating language processors, in particular, translator generators. The purpose of this tool is to allow the fast implementation of (non-production quality) translators for any language, ...

Karen A. Lemone

1987-02-01T23:59:59.000Z

192

Tracking Santa: An Interview with the Head Researcher | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tracking Santa: An Interview with the Head Researcher Tracking Santa: An Interview with the Head Researcher Tracking Santa: An Interview with the Head Researcher December 23, 2010 - 11:12am Addthis Tracking Santa: An Interview with the Head Researcher Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs What does this mean for me? You'll be able to start monitoring St. Nick's journey starting at 6 AM ET on Christmas Eve. Every year since 1998, the Department of Energy's Los Alamos lab has been using state of the art technology to track Santa Claus as he circles the globe the night before Christmas. You'll be able to start monitoring St. Nick's journey here starting at 6 AM ET on Christmas Eve. This week, I got a chance to talk to Santa Tracker Head Researcher (and Cibola Flight Experiment Project Leader) Diane Roussel-Dupre to get a

193

Nuclear Engineering Division: interviews on Situation at Japan's nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

Interviews on Situation at Japan's Interviews on Situation at Japan's nuclear reactors Welcome Organization Visit Argonne Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Celebrating the 70th Anniversary of Chicago Pile 1 (CP-1) Argonne OutLoud on Nuclear Energy Argonne Energy Showcase 2012 Nuclear Engineering Division: interviews on Situation at Japan's nuclear reactors Bookmark and Share Fukushima Update "Fukushima and Chernobyl: Myth versus Reality" Fukushima and Chernobyl: Myth versus Reality Want to bypass the popular press myths and gain a true understanding of the radiation releases at Fukushima? Watch this video » Several experts from the Nuclear Engineering Division at Argonne National Laboratory have been interviewed on the situation at Japan's nuclear

194

Third Interview with Professor Peter Stein - 23 November 2007  

E-Print Network (OSTI)

Conversations with Professor Peter Gonville Stein Third Interview: Published Scholarly Works Date: 23 November 2007 Between July and November 2007 Professor Stein was interviewed three times at the Squire Law Library in the Faculty of Law... have been a competent politician There is still a lot of mystery about Vacarius#2;. I put forward the theory in this book that he gave lectures in Lincoln because Lincoln was quite near where he was a priest in charge at Southwell in Nottinghamshire#2...

Dingle, Lesley; Bates, Daniel

2008-05-14T23:59:59.000Z

195

DOE Order Self Study Modules - DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5.1D 5.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES DOE O 425.1D Familiar Level June 2011 1 DOE O 425.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1. What is the purpose of DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities? 2. What are the requirements for determining the level of readiness review [operational readiness reviews (ORRs) and readiness assessments (RAs)]? 3. What are the requirements for determining the startup authorization authority? 4. What are the requirements for startup notification reports?

196

River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99  

Science Conference Proceedings (OSTI)

The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.

SHOOP, D.S.

1999-09-10T23:59:59.000Z

197

GRIMHX verification and validation action matrix summary  

Science Conference Proceedings (OSTI)

WSRC-RP-90-026, Certification Plan for Reactor Analysis Computer Codes, describes a series of action items to be completed for certification of reactor analysis computer codes used in Technical Specifications development and for other safety and production support calculations. Validation and verification of the code is an integral part of this process. This document identifies the work performed and documentation generated to satisfy these action items for the Reactor Physics computer code GRIMHX. Each action item is discussed with the justification for its completion. Specific details of the work performed are not included in this document but are found in the references. The publication of this document signals the validation and verification effort for the GRIMHX code is completed.

Trumble, E.F.

1991-12-01T23:59:59.000Z

198

NGSI: IAEA Verification of UF6 Cylinders  

Science Conference Proceedings (OSTI)

The International Atomic Energy Agency (IAEA) is often ignorant of the location of declared, uranium hexafluoride (UF6) cylinders following verification, because cylinders are not typically tracked onsite or off. This paper will assess various methods the IAEA uses to verify cylinder gross defects, and how the task could be ameliorated through the use of improved identification and monitoring. The assessment will be restricted to current verification methods together with one that has been applied on a trial basis—short-notice random inspections coupled with mailbox declarations. This paper is part of the NNSA Office of Nonproliferation and International Security’s Next Generation Safeguards Initiative (NGSI) program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF6 cylinders.

Curtis, Michael M.

2012-06-05T23:59:59.000Z

199

Conceptual design. Final report: TFE Verification Program  

DOE Green Energy (OSTI)

This report documents the TFE Conceptual Design, which provided the design guidance for the TFE Verification program. The primary goals of this design effort were: (1) establish the conceptual design of an in-core thermionic reactor for a 2 Mw(e) space nuclear power system with a 7-year operating lifetime; (2) demonstrate scalability of the above concept over the output power range of 500 kW(e) to 5 MW(e); and (3) define the TFE which is the basis for the 2 MW (e) reactor design. This TFE specification provided the basis for the test program. These primary goals were achieved. The technical approach taking in the conceptual design effort is discussed in Section 2, and the results are discussed in Section 3. The remainder of this introduction draws a perspective on the role that this conceptual design task played in the TFE Verification Program.

Not Available

1994-03-01T23:59:59.000Z

200

Our purpose and direction 2012 to 2015  

E-Print Network (OSTI)

Corporate Our purpose and direction summary 2012 to 2015 #12;Forestry Commission Wales 3 Our direction Our work is guided by Woodlands for Wales, the WG's 50-year strategy for woodlands and trees. We trees and woodlands now and in the future. We work both directly on the WGWE and with other woodland

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data Policy 1 Purpose and Readership  

E-Print Network (OSTI)

Data Policy CONTENTS 1 Purpose and Readership 2 Terms and Definitions 3 Background 4 General Issues Relating to Data 4.1 The Nature of the Data Resource 4.2 Ownership and Custody of Data 4.3 Obligations of Those Holding Data 4.4 Obligations of LOCAR towards Scientists Collecting Data 4.5 Other Legal

Brierley, Andrew

202

PURPOSE STATEMENT UNIVERSITY OF CALIFORNIA PRESIDENT'S COUNCIL  

E-Print Network (OSTI)

and disclose your PHI for medical research purposes. National Security, Intelligence Activities, and Protective Services. The plans may release your PHI to authorized federal officials: 1) for intelligence, counterintelligence, and other national security activities authorized by law and 2) to enable them to provide

Young, A. Peter

203

Better Buildings Neighborhood Program: "Focus Series" Interviews  

NLE Websites -- All DOE Office Websites (Extended Search)

"Focus Series" "Focus Series" Interviews to someone by E-mail Share Better Buildings Neighborhood Program: "Focus Series" Interviews on Facebook Tweet about Better Buildings Neighborhood Program: "Focus Series" Interviews on Twitter Bookmark Better Buildings Neighborhood Program: "Focus Series" Interviews on Google Bookmark Better Buildings Neighborhood Program: "Focus Series" Interviews on Delicious Rank Better Buildings Neighborhood Program: "Focus Series" Interviews on Digg Find More places to share Better Buildings Neighborhood Program: "Focus Series" Interviews on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events "Focus Series" Interviews In December 2012, the Better Buildings Neighborhood Program launched the

204

Secure Position Verification for Wireless Sensor Networks in Noisy Channels  

E-Print Network (OSTI)

Position verification in wireless sensor networks (WSNs) is quite tricky in presence of attackers (malicious sensor nodes), who try to break the verification protocol by reporting their incorrect positions (locations) during the verification stage. In the literature of WSNs, most of the existing methods of position verification have used trusted verifiers, which are in fact vulnerable to attacks by malicious nodes. They also depend on some distance estimation techniques, which are not accurate in noisy channels (mediums). In this article, we propose a secure position verification scheme for WSNs in noisy channels without relying on any trusted entities. Our verification scheme detects and filters out all malicious nodes from the network with very high probability.

Mandal, Partha Sarathi

2011-01-01T23:59:59.000Z

205

Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transitioning Kentucky Off Oil: An Interview with Clean Cities Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell June 18, 2013 - 4:12pm Addthis With the help of Kentucky Clean Fuels Coalition, Mammoth Cave National Park was the first National Park fleet to use 100 percent alternative fuel. The Global Electric Motorcar (pictured above) is used by park rangers who need to travel between the Mammoth Cave Campground and the Visitor Center area. | Photo courtesy of Victor Peek Photography. With the help of Kentucky Clean Fuels Coalition, Mammoth Cave National Park was the first National Park fleet to use 100 percent alternative fuel. The Global Electric Motorcar (pictured above) is used by park rangers who need

206

GUIDANCE TO COMPLETING THE SELF-DIRECTED RBSM INTERVIEW FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO COMPLETING THE SELF-DIRECTED RBSM TO COMPLETING THE SELF-DIRECTED RBSM INTERVIEW FORM The RBSM Process This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review process and provide the reviewer with some of the rationale behind the questions that are asked. This companion piece does not emulate the exact order of the review process interview form but rather, attempts to address the major pathways that may be followed along the way to selecting a given disposition category. The RBSM review process is outlined in a detailed flow chart which is subdivided into various sections. The first section of the flow chart initially identifies the activity to be evaluated. The remaining sections include a

207

1.0 Purpose and Need  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Purpose and Need 0 Purpose and Need The Western Area Power Administration (Western), created in 1977 under the Department of Energy (DOE) Organization Act (Public Law 95-91), markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of power from the Central Valley Project (CVP) and other sources and markets nonfirm energy from the Washoe Project. The Sierra Nevada Region's marketing area is shown in Figure 1.1. Western's mission is to market and transmit electricity that is in excess of CVP Project Use (power required for project operations), which for the Sierra Nevada Region is generated from CVP and Washoe Project powerplants. Western's power marketing

208

Fourth Interview with Sir Eli Lauterpacht - 20 March 2008  

E-Print Network (OSTI)

://www.mefacts.com/cached.asp?x_id=11028 #2; See item 29, interview 2. #2; See item 29, interview 2. #2; 1915-2002. Born Aubrey Solomon Meir, Cape Town. Israeli diplomat and politician. Queens’ College Cambridge. #2; b. 1937, Leeds. UN Assistant Secretary General for Legal Affairs... , Leeds. UN Assistant Secretary General for Legal Affairs 1998-2005 See: http://www.lcil.cam.ac.uk/lectures/2007-08_ralph_zacklin.php 13 See: http://www.20essexst.com/bar/%20j_wood_m/wood_m.htm 14 Taba Tribunal (Egypt/Israel, 1986-1989): G...

Dingle, Lesley; Bates, Daniel

2008-06-19T23:59:59.000Z

209

A golden anniversary for space-based treaty verification  

NLE Websites -- All DOE Office Websites (Extended Search)

enabled serendipitous discoveries of remarkable natural phenomena such as cosmic gamma-ray bursts, X-ray novae and solar wind composition. Modern space-based verification systems...

210

Evaluation, Measurement, and Verification (EM&V) of Residential...  

NLE Websites -- All DOE Office Websites (Extended Search)

Evaluation, Measurement, and Verification (EM&V) of Residential Behavior-Based Energy Efficiency Programs: Issues and Recommendations Title Evaluation, Measurement, and...

211

Review of the Pantex Plant Implementation Verification Review...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Pantex Plant Implementation Verification Review Processes February 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of...

212

Review of the Implementation Verification Rev iew Processes at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management...

213

Example Measurement & Verification Plan for a Super ESPC Project  

Energy.gov (U.S. Department of Energy (DOE))

Report features a comprehensive measurement and verification (M&V) plan for a fictitious super energy savings performance contract (ESPC) project.

214

Measurement and Verification of Low Income Energy Efficiency...  

Open Energy Info (EERE)

and Verification of Low Income Energy Efficiency Programs in Brazil: Methodological Challenges Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Measurement and...

215

Volunteer to conduct free verifications for K-12 schools and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Volunteer to conduct free verifications for K-12 schools and worship facilities Secondary menu join us About us Press room Contact Us Portfolio Manager Login Facility owners and...

216

Event:Technical Workshop: Measurement, Reporting and Verification...  

Open Energy Info (EERE)

Technical Workshop: Measurement, Reporting and Verification (MRV): Experiences from and for implementation Jump to: navigation, search Calendar.png Technical Workshop: Measurement,...

217

Measurement and Verification of Low Income Energy Efficiency Programs in  

Open Energy Info (EERE)

Measurement and Verification of Low Income Energy Efficiency Programs in Measurement and Verification of Low Income Energy Efficiency Programs in Brazil: Methodological Challenges Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Measurement and Verification of Low Income Energy Efficiency Programs in Brazil: Methodological Challenges Focus Area: Energy Efficiency Topics: Socio-Economic Website: www.eceee.org/conference_proceedings/eceee/2009/Panel_3/3.049/ Equivalent URI: cleanenergysolutions.org/content/measurement-and-verification-low-inco Language: English Policies: "Regulations,Financial Incentives" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. Regulations: Feebates This report presents results from Brazilian electric utilities evaluation

218

SHINE VACUUM PUMP TEST VERIFICATION  

Science Conference Proceedings (OSTI)

Normetex pumps used world-wide for tritium service are no longer available. DOE and other researchers worldwide have spent significant funds characterizing this pump. Identification of alternate pumps is required for performance and compatibility with tritium gas. Many of the pumps that could be used to meet the functional performance requirements (e.g. pressure and flow conditions) of the Normetex pump have features that include the use of polymers or oils and greases that are not directly compatible with tritium service. This study assembles a test system to determine the flow characteristics for candidate alternate pumps. These tests are critical to the movement of tritium through the SHINE Tritium Purification System (TPS). The purpose of the pump testing is two-fold: (1) obtain baseline vacuum pump characteristics for an alternate (i.e. ?Normetex replacement?) pump intended for use in tritium service; and (2) verify that low pressure hydrogen gas can be transported over distances up to 300 feet by the candidate pumps. Flow rates and nominal system pressures have been identified for the SHINE Mo-99 production process Tritium Purification System (TPS). To minimize the line sizes for the transfer of low pressure tritium from the Neutron Driver Accelerator System (NDAS) to the primary processing systems in the TPS, a ?booster? pump has been located near the accelerator in the design. A series of pump tests were performed at various configurations using hydrogen gas (no tritium) to ensure that this concept is practical and maintains adequate flow rates and required pressures. This report summarizes the results of the tests that have been performed using various pump configurations. The current design of the Tritium Purification System requires the ?booster? pump to discharge to or to be backed by another vacuum pump. Since Normetex pumps are no longer manufactured, a commercially available Edwards scroll pump will be used to back the booster pump. In this case the ?booster pump? is an Adixen Molecular Drag Pump (MDP 5011) and the backing pump is an Edwards (nXDS15iC) scroll pump. Various configurations of the two pumps and associated lengths of ? inch tubing (0 feet to 300 feet) were used in combination with hydrogen and nitrogen flow rates ranging from 25-400 standard cubic centimeters per minute (sccm) to determine whether the proposed pump configuration meets the design criteria for SHINE. The results of this study indicate that even under the most severe conditions (300 feet of tubing and 400 sccm flow rate) the Adixen 5011 MDP can serve as a booster pump to transport gases from the accelerator (NDAS) to the TPS. The Target Gas Receiving System pump (Edwards nXDS15iC) located approximately 300 feet from the accelerator can effectively back the Adixen MDP. The molecular drag pump was able to maintain its full rotational speed even when the flow rate was 400 sccm hydrogen or nitrogen and 300 feet of tubing was installed between the drag pump and the Edwards scroll pump. In addition to maintaining adequate rotation, the pressure in the system was maintained below the target pressure of 30 torr for all flow rates, lengths of tubing, and process gases. This configuration is therefore adequate to meet the SHINE design requirements in terms of flow and pressure.

Morgan, G.; Peters, B.

2013-09-30T23:59:59.000Z

219

CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-23 Verification of High EER Equipment (Page 1 of 1)  

E-Print Network (OSTI)

CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-23 Verification of High EER 2009 Verification of High EER Equipment Procedures for verification of High EER Equipment are described. 1 System Name or Identification/Tag 2 System Location or Area Served 3 Certified EER Rating

220

Radiological verification survey results at the Pompton Plains Railroad Spur, Pequannock, New Jersey (PJ008V)  

SciTech Connect

The US Department of Energy (DOE) conducted remedial action during 1993 at the Pompton Plains railroad spur and eight vicinity properties in the Wayne and Pequannock Townships in New Jersey as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are in the vicinity of the DOE-owned Wayne Interim Storage Site (WISS), formerly the W.R. Grace facility. The property at the Pompton Plains Railroad Spur, Pequannock, New Jersey is one of these vicinity properties. At the request of DOE, a team from Oak Ridge National Laboratory conducted an independent radiological verification survey at this property. The purpose of the survey, conducted between September and December 1993, was to confirm the success of the remedial actions performed to remove any radioactive materials in excess of the identified guidelines. The verification survey included surface gamma scans and gamma readings at 1 meter, beta-gamma scans, and the collection of soil and debris samples for radionuclide analysis. Results of the survey demonstrated that all radiological measurements on the property at the Pompton Plains railroad spur were within applicable DOE guidelines. Based on the results of the remedial action data and confirmed by the verification survey data, the portions of the site that had been remediated during this action successfully meet the DOE remedial action objectives.

Rodriguez, R.E.; Johnson, C.A.

1995-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Investigating Correlated Neutrons from Pulsed Photonuclear Interrogation for Treaty Verification Applications  

E-Print Network (OSTI)

The treaty verification field is of renewed importance as continued nuclear weapons disarmament is prioritized nationally in partnership with other nuclear weapons states. This interest has led to research and development on technologies that could support future U.S. verification missions. A technology employing pulses of high-energy photons from an electron linear accelerator is one technique under consideration. High-energy photons are advantageous as an interrogation source because they penetrate thick shielding and can generate neutrons inside a measurement object. The neutrons would then multiply when presented with an object containing fissile material and allow for detection in a time domain immediately after the pulse. The purpose of this work was to develop an understanding of neutron behavior following a high-energy photon pulse and then develop a tool set to analyze data from this region to determine if a measurement object contains multiplying material, the mass of that material if present, and the moderation in the measurement object. Results indicate the tool sets developed were able to determine multiplication was present accurately in 3 out of 4 realistic verification objects. Additionally the state of the moderation in each object was able to be determined, and the mass could potentially be determined by calibrating to representative samples.

Stewart, Scott

2013-08-01T23:59:59.000Z

222

An independent verification and validation of the Future Theater Level Model conceptual model  

Science Conference Proceedings (OSTI)

This report describes the methodology and results of independent verification and validation performed on a combat model in its design stage. The combat model is the Future Theater Level Model (FTLM), under development by The Joint Staff/J-8. J-8 has undertaken its development to provide an analysis tool that addresses the uncertainties of combat more directly than previous models and yields more rapid study results. The methodology adopted for this verification and validation consisted of document analyses. Included were detailed examination of the FTLM design documents (at all stages of development), the FTLM Mission Needs Statement, and selected documentation for other theater level combat models. These documents were compared to assess the FTLM as to its design stage, its purpose as an analytical combat model, and its capabilities as specified in the Mission Needs Statement. The conceptual design passed those tests. The recommendations included specific modifications as well as a recommendation for continued development. The methodology is significant because independent verification and validation have not been previously reported as being performed on a combat model in its design stage. The results are significant because The Joint Staff/J-8 will be using the recommendations from this study in determining whether to proceed with develop of the model.

Hartley, D.S. III; Kruse, K.L.; Martellaro, A.J.; Packard, S.L.; Thomas, B. Jr.; Turley, V.K.

1994-08-01T23:59:59.000Z

223

Appendix: Conjectures concerning proof, design, and verification.  

SciTech Connect

This article focuses on an esoteric but practical use of automated reasoning that may indeed be new to many, especially those concerned primarily with verification of both hardware and software. Specifically, featured are a discussion and some methodology for taking an existing design -- of a circuit, a chip, a program, or the like--and refining and improving it in various ways. Although the methodology is general and does not require the use of a specific program, McCune's program OTTER does offer what is needed. OTTER has played and continues to play the key role in my research, and an interested person can gain access to this program in various ways, not the least of which is through the included CD-ROM in [3]. When success occurs, the result is a new design that may require fewer components, avoid the use of certain costly components, offer more reliability and ease of verification, and, perhaps most important, be more efficient in the contexts of speed and heat generation. Although the author has minimal experience in circuit design, circuit validation, program synthesis, program verification, and similar concerns, (at the encouragement of colleagues based on successes to be cited) he presents materials that might indeed be of substantial interest to manufacturers and programmers. He writes this article in part prompted by the recent activities of chip designers that include Intel and AMD, activities heavily emphasizing the proving of theorems. As for his research that appears to the author to be relevant, he has made an intense and most profitable study of finding proofs that are shorter [2,3], some that avoid the use of various types of term, some that are far less complex than previously known, and the like. Those results suggest to me a strong possible connection between more appealing proofs (in mathematics and in logic) and enhanced and improved design of both hardware and software. Here the author explores diverse conjectures that elucidate some of the possibly fruitful connections.

Wos, L.

2000-05-31T23:59:59.000Z

224

Review of the Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 1

225

Review of the Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review, April 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 1

226

Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review Independent Oversight Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope...................................................................................................................................................... 2

227

Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes, November 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent Oversight Review Independent Oversight Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope...................................................................................................................................................... 2

228

Review of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections), Novvember 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections) May 2011 November 2011 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Scope ...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 1

229

Characteristic formulae for the verification of imperative programs  

Science Conference Proceedings (OSTI)

In previous work, we introduced an approach to program verification based on characteristic formulae. The approach consists of generating a higher-order logic formula from the source code of a program. This characteristic formula is constructed in such ... Keywords: characteristic formula, interactive verification, total correctness

Arthur Charguéraud

2011-09-01T23:59:59.000Z

230

Probabilistic Fusion of Sorted Score Sequences for Robust Speaker Verification  

E-Print Network (OSTI)

Probabilistic Fusion of Sorted Score Sequences for Robust Speaker Verification Ming-Cheung Cheung1 Engineering, Princeton University, USA Abstract. Fusion techniques have been widely used in multi-dependent fusion al- gorithm for speaker verification. The algorithm is data-dependent in that the fusion weights

Mak, Man-Wai

231

Towards the compositional verification of real-time UML designs  

Science Conference Proceedings (OSTI)

Current techniques for the verification of software as e.g. model checking are limited when it comes to the verification of complex distributed embedded real-time systems. Our approach addresses this problem and in particular the state explosion problem ... Keywords: embedded systems, object constraint language (OCL), pattern, real-time, unified modelling language (UML)

Holger Giese; Matthias Tichy; Sven Burmester; Wilhelm Schäfer; Stephan Flake

2003-09-01T23:59:59.000Z

232

Formal verification of compiler transformations on polychronous equations  

Science Conference Proceedings (OSTI)

In this paper, adopting the translation validation approach, we present a formal verification process to prove the correctness of compiler transformations on systems of polychronous equations. We encode the source programs and the transformations with ... Keywords: formal verification, multi-clocked synchronous programs, polychronous model, translation validation, validated compiler

Van Chan Ngo; Jean-Pierre Talpin; Thierry Gautier; Paul Le Guernic; Loïc Besnard

2012-06-01T23:59:59.000Z

233

Certification and verification for calmac flat plate solar collector  

DOE Green Energy (OSTI)

This document contains information used in the certification and verification of the Calmac Flat Plate Collector. Contained are such items as test procedures and results, information on materials used, Installation, Operation, and Maintenance Manuals, and other information pertaining to the verification and certification.

Not Available

1978-01-27T23:59:59.000Z

234

Modeling and Verification of Reactive Systems using Rebeca  

Science Conference Proceedings (OSTI)

Actor-based modeling has been successfully applied to the representation of concurrent and distributed systems. Besides having an appropriate and efficient way for modeling these systems, one needs a formal verification approach for ensuring their correctness. ... Keywords: actor model, compositional verification, model checking, property preserving abstraction, reactive systems

Marjan Sirjani; Ali Movaghar; Amin Shali; Frank S. de Boer

2004-12-01T23:59:59.000Z

235

Integrity verification of cloud-hosted data analytics computations  

Science Conference Proceedings (OSTI)

In this position paper, we present efficient and practical integrity verification techniques that check whether the untrusted cloud has returned correct result of outsourced data analytics computations. We consider the computation of summation form that ... Keywords: cloud analytics as a service, cloud computing, integrity verification, machine learning

Hui (Wendy) Wang

2012-08-01T23:59:59.000Z

236

Challenge benchmarks for verification of real-time programs  

Science Conference Proceedings (OSTI)

Real-time systems, and in particular safety-critical systems, are a rich source of challenges for the program verification community as software errors can have catastrophic consequences. Unfortunately, it is nearly impossible to find representative ... Keywords: java, real-time, verification

Tomas Kalibera; Pavel Parizek; Ghaith Haddad; Gary T. Leavens; Jan Vitek

2010-01-01T23:59:59.000Z

237

High-performance verification of large concurrent systems  

E-Print Network (OSTI)

High-performance verification of large concurrent systems Elbie taKrpska Ph.D. Thesis VU University Systems Ph.D. Thesis Elzbieta Krepska VU University Amsterdam, 2012 #12;This research was funded by the VU. #12;VRIJE UNIVERSITEIT TOWARDS BIG BIOLOGY: HIGH-PERFORMANCE VERIFICATION OF LARGE CONCURRENT SYSTEMS

Bal, Henri E.

238

Mismatch modeling and compensation for robust speaker verification  

Science Conference Proceedings (OSTI)

In this study, primary channel mismatch scenario between enrollment and test conditions in a speaker verification task are analyzed and modeled. A novel Gaussian mixture modeling with a universal background model (GMM-UBM) frame based compensation model ... Keywords: Eigenchannel, Factor analysis, Mismatch compensation, Speaker verification

Yun Lei; John H. L. Hansen

2011-02-01T23:59:59.000Z

239

U. S. Government purposes. LS-253  

NLE Websites -- All DOE Office Websites (Extended Search)

W·31·10!rENG·38. W·31·10!rENG·38. Accordingly. the U. S. Government retains a nonexclusive, royalty-free license to publish Or reproduce the published form of this contribution, or allow others to do so, for U. S. Government purposes. LS-253 A Shimming Technique for Improvement of the Spectral Performance of APS Undulator A I. Vasserman Experimental Facilities Division, APS January 9, 1996 Advanced Photon Source Argonne National Laboratory A shimming technique for improvement of the spectral performance of APS Undulator A 1. Vasserman Advanced Photon Source, Argonne National Laboratory, Argonne, IL 60439 TABLE OF CONTENTS 1. Introduction 2. The shimming technique: calculations and experimental results 3. Conclusion 4 Acknowledgments 5 References 1. Introduction

240

Electronic multi-purpose material level sensor  

DOE Patents (OSTI)

The present electronic multi-purpose material level sensor is based on time domain reflectometry (TDR) of very short electrical pulses. Pulses are propagated along a transmission line that is partially immersed in a liquid, powder, or other substance such as grain in a silo. The time difference of the reflections at the start of the transmission line and the air/liquid interface are used to determine levels to better than 0.01 inch. The sensor is essentially independent of circuit element and temperature variations, and can be mass produced at an extremely low price. The transmission line may be a Goubau line, microstrip, coaxial cable, twin lead, CPS or CPW, and may typically be a strip placed along the inside wall of a tank. The reflected pulses also contain information about strata within the liquid such as sludge-build-up at the bottom of an oil tank.

McEwan, Thomas E. (Livermore, CA)

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Electronic multi-purpose material level sensor  

DOE Patents (OSTI)

The present electronic multi-purpose material level sensor is based on time domain reflectometry (TDR) of very short electrical pulses. Pulses are propagated along a transmission line that is partially immersed in a liquid, powder, or other substance such as grain in a silo. The time difference of the reflections at the start of the transmission line and the air/liquid interface are used to determine levels to better than 0.01 inch. The sensor is essentially independent of circuit element and temperature variations, and can be mass produced at an extremely low price. The transmission line may be a Goubau line, microstrip, coaxial cable, twin lead, CPS or CPW, and may typically be a strip placed along the inside wall of a tank. The reflected pulses also contain information about strata within the liquid such as sludge-build-up at the bottom of an oil tank. 9 figs.

McEwan, T.E.

1997-03-11T23:59:59.000Z

242

Approaches to verification of two-dimensional water quality models  

DOE Green Energy (OSTI)

The verification of a water quality model is the one procedure most needed by decision making evaluating a model predictions, but is often not adequate or done at all. The results of a properly conducted verification provide the decision makers with an estimate of the uncertainty associated with model predictions. Several statistical tests are available for quantifying of the performance of a model. Six methods of verification were evaluated using an application of the BETTER two-dimensional water quality model for Chickamauga reservoir. Model predictions for ten state variables were compared to observed conditions from 1989. Spatial distributions of the verification measures showed the model predictions were generally adequate, except at a few specific locations in the reservoir. The most useful statistics were the mean standard error of the residuals. Quantifiable measures of model performance should be calculated during calibration and verification of future applications of the BETTER model. 25 refs., 5 figs., 7 tabs.

Butkus, S.R. (Tennessee Valley Authority, Chattanooga, TN (USA). Water Quality Dept.)

1990-11-01T23:59:59.000Z

243

Surveillance Guide - OPS 9.10 Independent Verification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INDEPENDENT VERIFICATION INDEPENDENT VERIFICATION 1.0 Objective The objective of this surveillance is to evaluate the conduct of selected independent verification activities. This surveillance provides a basis for evaluating the effectiveness of the contractor's independent verifications programs and for establishing compliance with DOE requirements. 2.0 References 2.1 DOE 5480.19, Conduct of Operations Requirements for DOE Facilities 2.2 DOE-STD-1036-93, Guide to Good Practices for Independent Verification 3.0 Requirements Implemented This surveillance is conducted to implement requirements of the Functions, Responsibilities and Authorities Manual, Section 20, Operations, FRAM #s 4253, 4258, and 4261. These requirements are drawn from DOE 5480.19.

244

CRAD, Implementation Verification Review - July 20, 2011 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Verification Review - July 20, 2011 Implementation Verification Review - July 20, 2011 CRAD, Implementation Verification Review - July 20, 2011 July 20, 2011 Implementation Verification Review of Safety Basis Hazard Controls (HSS CRAD 45-39, Rev. 1) The Implementation Verification Review (IVR) inspection will evaluate the effectiveness of processes for independently verifying and re-verifying implementation of the safety basis hazard controls at the site's nuclear facilities and associated site office oversight methodology. The inspection will consist of an evaluation of the procedures and processes that establish the IVR or similar process, as well as an evaluation of IVR or similar processes implementation and oversight. Review of implementation at a site may include any or all of the following activities:

245

Verification and validation for induction heating  

SciTech Connect

Truchas is a software package being developed at LANL within the Telluride project for predicting the complex physical processes in metal alloy casting. The software was designed to be massively parallel, multi-material, multi-physics, and to run on 3D, fully unstructured meshes. This work describes a Verification and Validation assessment of Truchas for simulating the induction heating phase of a casting process. We used existing data from a simple experiment involving the induction heating of a graphite cylinder, as graphite is a common material used for mold assemblies. Because we do not have complete knowledge of all the conditions and properties in this experiment (as is the case in many other experiments), we performed a parameter sensitivity study, modeled the uncertainties of the most sensitive parameters, and quantified how these uncertainties propagate to the Truchas output response. A verification analysis produced estimates of the numerical error of the Truchas solution to our computational model. The outputs from Truchas runs with randomly sampled parameter values were used for the validation study.

Lam, Kin [Los Alamos National Laboratory; Tippetts, Trevor B [Los Alamos National Laboratory; Allen, David W [NON LANL

2008-01-01T23:59:59.000Z

246

Monitoring/Verification using DMS: TATP Example  

Science Conference Proceedings (OSTI)

Field-rugged and field-programmable differential mobility spectrometry (DMS) networks provide highly selective, universal monitoring of vapors and aerosols at detectable levels from persons or areas involved with illicit chemical/biological/explosives (CBE) production. CBE sensor motes used in conjunction with automated fast gas chromatography with DMS detection (GC/DMS) verification instrumentation integrated into situational operations-management systems can be readily deployed and optimized for changing application scenarios. The feasibility of developing selective DMS motes for a “smart dust” sampling approach with guided, highly selective, fast GC/DMS verification analysis is a compelling approach to minimize or prevent the illegal use of explosives or chemical and biological materials. DMS is currently one of the foremost emerging technologies for field separation and detection of gas-phase chemical species. This is due to trace-level detection limits, high selectivity, and small size. Fast GC is the leading field analytical method for gas phase separation of chemical species in complex mixtures. Low-thermal-mass GC columns have led to compact, low-power field systems capable of complete analyses in 15–300 seconds. A collaborative effort optimized a handheld, fast GC/DMS, equipped with a non-rad ionization source, for peroxide-based explosive measurements.

Stephan Weeks, Kevin Kyle, Manuel Manard

2008-05-30T23:59:59.000Z

247

DESIGN INFORMATION VERIFICATION FOR NUCLEAR SAFEGUARDS  

Science Conference Proceedings (OSTI)

A critical aspect of international safeguards activities performed by the International Atomic Energy Agency (IAEA) is the verification that facility design and construction (including upgrades and modifications) do not create opportunities for nuclear proliferation. These Design Information Verification activities require that IAEA inspectors compare current and past information about the facility to verify the operator’s declaration of proper use. The actual practice of DIV presents challenges to the inspectors due to the large amount of data generated, concerns about sensitive or proprietary data, the overall complexity of the facility, and the effort required to extract just the safeguards relevant information. Planned and anticipated facilities will (especially in the case of reprocessing plants) be ever larger and increasingly complex, thus exacerbating the challenges. This paper reports the results of a workshop held at the Idaho National Laboratory in March 2009, which considered technologies and methods to address these challenges. The use of 3D Laser Range Finding, Outdoor Visualization System, Gamma-LIDAR, and virtual facility modeling, as well as methods to handle the facility data issues (quantity, sensitivity, and accessibility and portability for the inspector) were presented. The workshop attendees drew conclusions about the use of these techniques with respect to successfully employing them in an operating environment, using a Fuel Conditioning Facility walk-through as a baseline for discussion.

Robert S. Bean; Richard R. M. Metcalf; Phillip C. Durst

2009-07-01T23:59:59.000Z

248

New England Wind Forum: Interviews with Wind Industry Stakeholders and  

Wind Powering America (EERE)

Small Wind Small Wind Large Wind Newsletter Perspectives Events Quick Links to States CT MA ME NH RI VT Bookmark and Share Interviews With Wind Industry Stakeholders and Pioneers in New England The New England Wind Forum will interview different stakeholders actively shaping the wind power landscape in New England and wind pioneers to examine how they have laid the groundwork for today's New England wind energy market. Stephan Wollenburg, Green Energy Program Director of Energy Consumers Alliance of New England January 2013 A Panel of Seven Offer Insight into the Evolving Drivers and Challenges Facing Wind Development in New England June 2011 John Norden, Manager of Renewable Resource Integration, Independent System Operator-New England September 2010 Angus King, Former Governor of Maine and Co-Founder of Independence Wind

249

An Interview with LANL's International, Space, and Response (ISR) New  

NLE Websites -- All DOE Office Websites (Extended Search)

An Interview with LANL's International, Space, and Response (ISR) New An Interview with LANL's International, Space, and Response (ISR) New Division Leader Kevin Saeger was appointed Los Alamos National Laboratory International, Space, and Response Division Leader in 2010. Formerly a Decision Applications Division group leader, Saeger has worked at the Laboratory for ten years. Saeger has a bachelor's degree in aerospace engineering, and master's and doctoral degrees in aeronautics and astronautics from the Massachusetts Institute of Technology. NSS: Your experience has been diverse-aerospace engineering, software design, working at the Pentagon, and leading a LANL risk analysis group to halt terrorism. What attracted you to ISR? ISR is unparalleled in its ability to successfully integrate science, engineering, and technology to deliver custom sensors to the field. ISR has

250

REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REQUIREMENTS BASED SURVEILLANCE AND REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM General Information: A. Evaluator:_______________________ Organization:___________________ Ph:_________________ B. Interviewee:_____________________ Organization:____________________ Ph:_________________ C. Activity Name :_____________________________________________________ General/Administrative Support Mission/Facility Support (Circle One) D. Safety Related: _____Yes _____No E. Procedure #: _______________________________________________________ F. Charge Number: _____________________________________________________ G. Frequency for Conducting the Activity: (Circle One) Hourly Shiftly Daily Weekly Bi-weekly Monthly Quarterly Semi-Annually Annually

251

Sixth Interview with Sir Eli Lauterpacht - 2 April 2008  

E-Print Network (OSTI)

. It no longer has the allure that it had in those days. Today, international lawyers are much more concerned with, let us say, the environment and climate change and so on. 164. Well now, passing on from the continental international lawyers whom I recall, I... character, namely, Clive Parry20. 14 He was Senior Military War Crimes Prosecutor in the British Occupied Zone of Germany, 1947-49. In 1945 he interviewed Rudolf Hoess, Commandant of Auschwitz. 15 See...

Dingle, Lesley; Bates, Daniel

2008-06-19T23:59:59.000Z

252

A Cosmic Ray Telescope For Educational Purposes  

SciTech Connect

Cosmic ray detectors are widely used, for educational purposes, in order to motivate students to the physics of elementary particles and astrophysics. Using a 'telescope' of scintillation counters, the directional characteristics, diurnal variation, correlation with solar activity, can be determined, and conclusions about the composition, origin and interaction of elementary particles with the magnetic field of earth can be inferred. A telescope was built from two rectangular scintillator panels with dimensions: 91.6x1.9x3.7 cm{sup 3}. The scintillators are placed on top of each other, separated by a fixed distance of 34.6 cm. They are supported by a wooden frame which can be rotated around a horizontal axis. Direction is determined by the coincidence of the signals of the two PMTs. Standard NIM modules are used for readout. This device is to be used in the undergraduate nuclear and particle physics laboratory. The design and construction of the telescope as well as some preliminary results are presented.

Voulgaris, G.; Kazanas, S.; Chamilothoris, I. [Department of Physics, National and Kapodistrian University of Athens (Greece)

2010-01-21T23:59:59.000Z

253

Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

Kent Norris

2010-03-01T23:59:59.000Z

254

Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

Kent Norris

2009-10-01T23:59:59.000Z

255

Supplement No. 2 to the FUSRAP Summary Protocol – Verification and Certification Protocol  

Energy.gov (U.S. Department of Energy (DOE))

Supplement No. 2 to the FUSRAP Summary Protocol – Verification and Certification Protocol (November 1985, Rev. 1)

256

BUSpec: A framework for generation of verification aids for standard bus protocol specifications  

Science Conference Proceedings (OSTI)

A typical verification intellectual property (VIP) of a bus protocol such as ARM advanced micro-controller bus architecture (AMBA) or PCI consists of a set of assertions and associated verification aids such as test-benches, design-ware models and coverage ... Keywords: Assertion-based verification, Bus functional models, Protocol validation, Verification intellectual property

Bhaskar Pal; Ansuman Banerjee; Pallab Dasgupta; P. P. Chakrabarti

2007-04-01T23:59:59.000Z

257

A dynamic assertion-based verification platform for validation of UML designs  

Science Conference Proceedings (OSTI)

Capacity limitations continue to impede widespread adoption of formal property verification in the design validation ow of software and hardware systems. The more popular choice (at least in the hardware domain) has been dynamic property verification ... Keywords: UML, assertion checking, dynamic property verification, software verification

A. Banerjee; S. Ray; P. Dasgupta; P. P. Chakrabarti; S. Ramesh; P. Vignesh; V. Ganesan

2012-01-01T23:59:59.000Z

258

The Role of science in treaty verification  

SciTech Connect

Technologically advanced nations are currently applying more science to treaty verification than ever before. Satellites gather a multitude of information relating to proliferation concerns using thermal imaging analysis, nuclear radiation measurements, and optical and radio frequency signals detection. Ground stations gather complementary signals such as seismic events and radioactive emissions. Export controls in many countries attempt to intercept materials and technical means that could be used for nuclear proliferation. Never the less, we have witnessed a plethora of nuclear proliferation episodes, that were undetected (or were belatedly detected) by these technologies - the Indian nuclear tests in 1998, the Libyan nuclear buildup, the Iranian enrichment program and the North Korea nuclear weapons program are some prime examples. In this talk we will discuss some of the technologies used for proliferation detection. In particular, we will note some of the issues relating to nuclear materials control agreements that epitomize political difficulties as they impact the implementation of science and technology.

Gavron, A. I. (Avigdor I.)

2004-01-01T23:59:59.000Z

259

Verification Checklist Home Address: City: State: Zip:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Indoor airPLUS Version 1 (Rev. 01) Verification Checklist Home Address: City: State: Zip: Section Requirements (Refer to full Indoor airPLUS Construction Specifications for details) Must Correct Builder Verified Rater Verified N/A Note: The Rev. 01 checklist has been modified to reflect only the additional Indoor airPLUS requirements and their corresponding section numbers that must be met after completing the ENERGY STAR checklists. ENERGY STAR remains a prerequisite for Indoor airPLUS certification. ENERGY STAR V3 Checklists Thermal Enclosure System Rater Checklist completed. o o Water Management System Builder Checklist completed. o o HVAC System Quality Installation Contractor Checklist completed. o o HVAC System Quality Installation Rater Checklist completed. o o

260

Status Report on REC Verification, Tracking and Associated Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

REC REC Verification, Tracking Systems and Associated Issues DOE Workshop on REC Markets and Challenges September 11, 2007 Meredith Wingate Director of Clean Energy Policy Design and Implementation Center for Resource Solutions Main Points * Think National - Verification issues are getting more complicated with the intersection of RECs and emissions markets - Market needs more rigorous verification * More coordination is needed Role of Tracking Systems * Primary tool for implementing state RPS programs * Produce data for environmental disclosure programs * Facilitate REC transactions Certificate-based Tracking Programs * ERCOT RECs Program (2001) * NEPOOL GIS (2002) * WI RRC Program (2003-2007) * PJM GATS (2005) * NJ SRECS (2005) * WREGIS (2007) * M-RETS (2007) * New York State (2008?)

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Reviewing Measurement and Verification Plans for Federal ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reviewing Measurement & Verification Plans Reviewing Measurement & Verification Plans for Federal ESPC Projects February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's web site at www.eere.energy.gov/femp/financing/ . [Headers and footers only revised 12/08] Reviewing M&V Plans Contents REVIEWING MEASUREMENT AND VERIFICATION PLANS FOR FEDERAL ESPC PROJECTS ............................................................................................................ 1 STEP 1 - PREPARE CUSTOM REPORT AND CHECKLIST FROM TEMPLATE .......................... 1

262

Measurement & Verification with Green Button Data | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measurement & Verification with Green Button Data Measurement & Verification with Green Button Data Measurement & Verification with Green Button Data April 13, 2012 - 4:15pm Addthis Shankar Earni Program Manager at Lawrence Berkeley National Laboratory Measurement and verification (M&V) focuses on ensuring that the savings from energy efficiency projects are being realized with a certain degree of confidence. M&V involves understanding how energy savings arebeing realized from a project; designing a cost-effective assessment strategy that addresses how to ensure the savings can be measured; and implementing the designed strategy by gathering the key data followed by analysis and reporting of the actual savings. In some cases, data from the Green Button program can be used to assess the energy savings from new efficiency

263

Skill Scores and Correlation Coefficients in Model Verification  

Science Conference Proceedings (OSTI)

Attributes of the anomaly correlation coefficient, as a model verification measure, are investigated by exploiting a recently developed method of decomposing skill scores into other measures of performance. A mean square error skill score based ...

Allan H. Murphy; Edward S. Epstein

1989-03-01T23:59:59.000Z

264

V-073: IBM Tivoli Federated Identity Manager Signature Verification Flaw  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: IBM Tivoli Federated Identity Manager Signature Verification 3: IBM Tivoli Federated Identity Manager Signature Verification Flaw Lets Remote Users Modify Attributes V-073: IBM Tivoli Federated Identity Manager Signature Verification Flaw Lets Remote Users Modify Attributes January 21, 2013 - 12:15am Addthis PROBLEM: IBM Tivoli Federated Identity Manager Signature Verification Flaw Lets Remote Users Modify Attributes PLATFORM: Tivoli Federated Identity Manager versions 6.2.0, 6.2.1, 6.2.2 ABSTRACT: A vulnerability was reported in IBM Tivoli Federated Identity Manager. REFERENCE LINKS: IBM Security Bulletin: 1615744 SecurityTracker Alert ID: 1028011 CVE-2012-6359 IMPACT ASSESSMENT: Medium DISCUSSION: The system does not check that all attributes have been signed. A remote user with the ability to conduct a man-in-the-middle attack can modify

265

Summary Verification Measures and Their Interpretation for Ensemble Forecasts  

Science Conference Proceedings (OSTI)

Ensemble prediction systems produce forecasts that represent the probability distribution of a continuous forecast variable. Most often, the verification problem is simplified by transforming the ensemble forecast into probability forecasts for ...

A. Allen Bradley; Stuart S. Schwartz

2011-09-01T23:59:59.000Z

266

Neighborhood Verification: A Strategy for Rewarding Close Forecasts  

Science Conference Proceedings (OSTI)

High-resolution forecasts may be quite useful even when they do not match the observations exactly. Neighborhood verification is a strategy for evaluating the “closeness” of the forecast to the observations within space–time neighborhoods rather ...

Elizabeth E. Ebert

2009-12-01T23:59:59.000Z

267

Scenario based performance optimisation in face verification using smart cards  

Science Conference Proceedings (OSTI)

We discuss the effect of an optimisation strategy to be applied to image data in a smart card based face verification system. Accordingly, we propose a system architecture considering the trade-off between performance versus the improvement of memory ...

Thirimachos Bourlai; Kieron Messer; Josef Kittler

2005-07-01T23:59:59.000Z

268

Clock independent timing verification of level-sensitive latches  

Science Conference Proceedings (OSTI)

This paper presents a method to automatically handle level-sensitive latches in timing analysis/verification. Timing specifications, including delays and timing constraints, are automatically generated for the cells in the design. The generated timing ...

Robert Tjärnström

1991-02-01T23:59:59.000Z

269

A Simplification of a Real-Time Verification Problem  

E-Print Network (OSTI)

We revisit the problem of real-time verification with dense dynamics using timeout and calendar based models and simplify this to a finite state verification problem. To overcome the complexity of verification of real-time systems with dense dynamics, Dutertre and Sorea, proposed timeout and calender based transition systems to model the behavior of real-time systems and verified safety properties using k-induction in association with bounded model checking. In this work, we introduce a specification formalism for these models in terms of Timeout Transition Diagrams and capture their behavior in terms of semantics of Timed Transition Systems. Further, we discuss a technique, which reduces the problem of verification of qualitative temporal properties on infinite state space of (a large fragment of) these timeout and calender based transition systems into that on clockless finite state models through a two-step process comprising of digitization and canonical finitary reduction. This technique enables us to ve...

Saha, Indranil; Roy, Suman; 10.1007/978-3-540-75596-8_21

2010-01-01T23:59:59.000Z

270

A lightweight specification language for bounded program verification  

E-Print Network (OSTI)

This thesis presents a new light-weight specification language called JForge Specification Language (JFSL) for object-oriented languages such as Java. The language is amenable to bounded verification analysis by a tool ...

Yessenov, Kuat T

2009-01-01T23:59:59.000Z

271

Distributions-Oriented Verification of Ensemble Streamflow Predictions  

Science Conference Proceedings (OSTI)

Ensemble streamflow prediction systems produce forecasts in the form of a conditional probability distribution for a continuous forecast variable. A distributions-oriented approach is presented for verification of these probability distribution ...

A. Allen Bradley; Stuart S. Schwartz; Tempei Hashino

2004-06-01T23:59:59.000Z

272

Verification of the Origins of Rotation in Tornadoes Experiment: VORTEX  

Science Conference Proceedings (OSTI)

This paper describes the Verification of the Origins of Rotation in Tornadoes Experiment planned for 1994 and 1995 to evaluate a set of hypotheses pertaining to tornadogenesis and tornado dynamics. Observations of state variables will be obtained ...

Erik N. Rasmussen; Jerry M. Straka; Robert Davies-Jones; Charles A. Doswell III; Frederick H. Carr; Michael D. Eilts; Donald R. MacGorman

1994-06-01T23:59:59.000Z

273

Explicitly Accounting for Observation Error in Categorical Verification of Forecasts  

Science Conference Proceedings (OSTI)

Given an accurate representation of errors in observations it is possible to remove the effect of those errors from categorical verification scores. The errors in the observations are treated as additive white noise that is statistically ...

Neill E. Bowler

2006-06-01T23:59:59.000Z

274

Event Order Abstraction for Parametric Real-Time System Verification  

E-Print Network (OSTI)

We present a new abstraction technique, event order abstraction (EOA), for parametric safety verification of real-time systems in which ``correct orderings of events'' needed for system correctness are maintained by timing ...

Umeno, Shinya

2008-07-28T23:59:59.000Z

275

Induction-based gate-level verification of multipliers  

Science Conference Proceedings (OSTI)

We propose a method based on unrolling the inductive definition of binary number multiplication to verify gate-level implementations of multipliers. The induction steps successively reduce the size of the multiplier under verification. Through induction, ...

Ying Tsai Chang; Kwang Ting Tim Cheng

2001-11-01T23:59:59.000Z

276

Speaker verification in noisy environment using missing feature approach  

Science Conference Proceedings (OSTI)

In order to handle speech signals corrupted by noise in speaker verification and provide robustness to systems, this paper evaluates the use of missing feature (MF) approach with a novel combination of techniques. A mask estimation based on spectral ...

Dayana Ribas; Jesús A. Villalba; Eduardo Lleida; José R. Calvo

2010-11-01T23:59:59.000Z

277

GPSI: General-Purpose Science Gateway Infrastructure | Argonne...  

NLE Websites -- All DOE Office Websites (Extended Search)

GPSI: General-Purpose Science Gateway Infrastructure GPSI: General-Purpose Science Gateway Infrastructure GPSI is a generic portal infrastructure for building a wide range of...

278

Verification and Validation of Facilities Procedures Assessment Plan - Developed By NNSA/Nevada Site Office Independent Oversight Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Verification and Validation of Facilities Procedures Verification and Validation of Facilities Procedures Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is verify and validate the process for the development of operations procedures and that procedures are in place which provide direction to personnel to ensure that the facility is operated within its design bases. Criteria: Operations procedures should be written to provide specific direction for operating systems and equipment during normal and postulated abnormal and emergency conditions. (DOE O 5480.19 A) Operations procedures should provide appropriate direction to ensure that the facility is operated within its design bases and should be effectively used to support safe operations of the facility. (DOE O 5480.19 A)

279

Field verification of CO{sub 2} Foam. Final report  

Science Conference Proceedings (OSTI)

The East Vacuum Grayburg/San Andres Unit (EVGSAU), operated by Phillips Petroleum Company, was the site selected for a comprehensive evaluation of the use of foam for improving the effectiveness of a CO{sub 2} flood. This project, entitled {open_quotes}Field Verification of CO{sub 2-}Foam,{close_quotes} was jointly funded by the EVGSAU working interest owners, the U.S. Department of Energy (DOE), and the State of New Mexico. The DOE provided $2 million or approximately 34% of the total project costs, the EVGSAU provided $2.46 million, the State of New Mexico contributed approximately $1.2 million, and about $103,000 of other industrial funds were used. The Petroleum Recovery Research Center (PRRC), a division of the New Mexico Institute of Mining and Technology, provided laboratory and research support for the project. A joint project advisory team composed of technical representatives from several major oil companies provided input, review, and guidance for the project. The project, which began in 1989, had a scheduled duration of four years, but the DOE granted a no-cost extension to the end of March 1995 for the purpose of continued project evaluation. A field test of the CO{sub 2}-foam has been successfully conducted, and preliminary results are promising. Response in the foam injection well has been as anticipated, and an offset producing well experienced a positive oil response as a result of the foam test. Based on the favorable results observed in the foam injection test, a second foam test was conducted. The monitoring program included analysis of injectivity data, pressure falloff tests, observation well logs, interwell tracer response, production logs, history of production rates, and changes in gas-oil ratio. This report presents an overview of the project and provides results of the laboratory work, simulation studies, and field tests.

Martin, F.D.; Heller, J.P.; Weiss, W.W. [and others

1996-02-01T23:59:59.000Z

280

Field verification of CO{sub 2} foam. Final report  

Science Conference Proceedings (OSTI)

The East Vacuum Grayburg/San Andres Unit (EVGSAU), operated by Phillips Petroleum Company, was the site selected for a comprehensive evaluation of the use of foam for improving the effectiveness of a CO{sub 2} flood. This project, entitled ``Field Verification of CO{sub 2}-Foam,`` was jointly funded by the EVGSAU working interest owners, the US Department of Energy (DOE), and the State of New Mexico. The DOE provided $2 million or approximately 34% of the total project costs, the EVGSAU provided $2.46 million, the State of New Mexico contributed approximately $1.2 million, and about $103,000 of other industrial funds were used. The Petroleum Recovery Research Center (PRRC), a division of the New Mexico Institute of Mining and Technology, provided laboratory and research support for the project. A joint project advisory team composed of technical representatives from several major oil companies provided input, review, and guidance for the project. The project, which began in 1989, had a scheduled duration of four years, but the DOE granted a no-cost extension to the end of March 1995 for the purpose of continued project evaluation. A field test of the CO{sub 2}-foam has been successfully conducted, and preliminary results are promising. Response in the foam injection well has been as anticipated, and an offset producing well experienced a positive oil response as a result of the foam test. Based on the favorable results observed in the foam injection test, a second foam test was conducted. The monitoring program included analysis of injectivity data, pressure falloff tests, observation well logs, interwell tracer response, production logs, history of production rates, and changes in gas-oil ratio. This report presents an overview of the project and provides results of the laboratory work, simulation studies, and field tests.

Martin, F.D.; Heller, J.P.; Weiss, W.W. [and others

1995-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

The EPRI/DOE Utility Wind Turbine Performance Verification Program  

DOE Green Energy (OSTI)

In 1992, the Electric Power Research Institute (EPRI) and the US Department of Energy (DOE) initiated the Utility Wind Turbine Performance Verification Program (TVP). This paper provides an overview of the TVP, its purpose and goals, and the participating utility projects. Improved technology has significantly reduced the cost of energy from wind turbines since the early 1980s. In 1992, turbines were producing electricity for about $0.07--$0.09/kilowatt-hour (kWh) (at 7 m/s [16 mph sites]), compared with more than $0.30/kWh in 1980. Further technology improvements were expected to lower the cost of energy from wind turbines to $0.05/kWh. More than 17,000 wind turbines, totaling more than 1,500 MW capacity, were installed in the US, primarily in California and Hawaii. The better wind plants had availabilities above 95%, capacity factors exceeding 30%, and operation and maintenance costs of $0.01/kWh. However, despite improving technology, EPRI and DOE recognized that utility use of wind turbines was still largely limited to turbines installed in California and Hawaii during the 1980s. Wind resource assessments showed that other regions of the US, particularly the Midwest, had abundant wind resources. EPRI and DOE sought to provide a bridge from utility-grade turbine development programs under way to commercial purchases of the wind turbines. The TVP was developed to allow utilities to build and operate enough candidate turbines to gain statistically significant operating and maintenance data.

Calvert, S.; Goldman, P. [Department of Energy, Washington, DC (United States); DeMeo, E.; McGowin, C. [Electric Power Research Inst., Palo Alto, CA (United States); Smith, B.; Tromly, K. [National Renewable Energy Lab., Golden, CO (United States)

1997-01-01T23:59:59.000Z

282

Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process  

SciTech Connect

This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work.

OLGUIN, L.J.

2000-09-25T23:59:59.000Z

283

Mode of interview and reporting of sensitive issues: Design and implementation of audio computer-assisted self-interviewing. NIDA Research Monograph 167:366–82  

E-Print Network (OSTI)

Substantial underreporting is typical in interviewing respondents on their drug use and other sensitive behaviors. This chapter reviews established strategies, self-administered questionnaires and indirect questioning techniques, for increasing the willingness of respondents to report stigmatizing behaviors. While these methods improve reporting, each has shortcomings and burdens which limit their effectiveness. A new computer-based self-interviewing approach which incorporates recorded audio playback of questions offers improved self-administered interviewing. The chapter discusses this technology, audio computer-assisted self-interviewing (audio-CASI), describing its features and positive results from the early research tests of the method.

Judith T. Lessler; James M. O’reilly

1997-01-01T23:59:59.000Z

284

PV1 model verification and validation  

E-Print Network (OSTI)

The purpose of this document is 1) to describe, in detail, the theoretic foundation on which PV1 is based, 2) indicate the manner in which its theoretical foundation has been translated into a practical, useful tool for ...

Fuller, Frank H.

1981-01-01T23:59:59.000Z

285

Battery Technology Life Verification Testing and Analysis  

DOE Green Energy (OSTI)

A critical component to the successful commercialization of batteries for automotive applications is accurate life prediction. The Technology Life Verification Test (TLVT) Manual was developed to project battery life with a high level of statistical confidence within only one or two years of accelerated aging. The validation effort that is presently underway has led to several improvements to the original methodology. For example, a newly developed reference performance test revealed a voltage path dependence effect on resistance for lithium-ion cells. The resistance growth seems to depend on how a target condition is reached (i.e., by a charge or a discharge). Second, the methodology for assessing the level of measurement uncertainty was improved using a propagation of errors in the fundamental measurements to the derived response (e.g., resistance). This new approach provides a more realistic assessment of measurement uncertainty. Third, the methodology for allocating batteries to the test matrix has been improved. The new methodology was developed to assign batteries to the matrix such that the average of each test group would be representative of the overall population. These changes to the TLVT methodology will help to more accurately predict a battery technology’s life capability with a high degree of confidence.

Jon P. Christophersen; Gary L. Hunt; Ira Bloom; Ed Thomas; Vince Battaglia

2007-12-01T23:59:59.000Z

286

Interim Letter Report - Verification Survey of Partial Grid E9, David Witherspoon, Inc. 1630 Site Knoxville, Tennessee  

SciTech Connect

Conduct verification surveys of available grids at the DWI 1630 in Knoxville, Tennessee. A representative with the Independent Environmental Assessment and Verification (IEAV) team from ORISE conducted a verification survey of a partial area within Grid E9.

P.C. Weaver

2008-06-12T23:59:59.000Z

287

Compliance and Verification of Standards and Labeling Programs in China: Lessons Learned  

SciTech Connect

After implementing several energy efficiency standards and labels (30 products covered by MEPS, 50 products covered by voluntary labels and 19 products by mandatory labels), the China National Institute of Standardization (CNIS) is now implementing verification and compliance mechanism to ensure that the energy information of labeled products comply with the requirements of their labels. CNIS is doing so by organizing check testing on a random basis for room air-conditioners, refrigerators, motors, heaters, computer displays, ovens, and self -ballasted lamps. The purpose of the check testing is to understand the implementation of the Chinese labeling scheme and help local authorities establishing effective compliance mechanisms. In addition, to ensure robustness and consistency of testing results, CNIS has coordinated a round robin testing for room air conditioners. Eight laboratories (Chinese (6), Australian (1) and Japanese (1)) have been involved in the round robin testing and tests were performed on four sets of samples selected from manufacturer's production line. This paper describes the methodology used in undertaking both check and round robin testing, provides analysis of testing results and reports on the findings. The analysis of both check and round robin testing demonstrated the benefits of a regularized verification and monitoring system for both laboratories and products such as (i) identifying the possible deviations between laboratories to correct them, (ii) improving the quality of testing facilities, (iii) ensuring the accuracy and reliability of energy label information in order to strength the social credibility of the labeling program and the enforcement mechanism in place.

Saheb, Yamina; Zhou, Nan; Fridley, David; Pierrot, Andre

2010-08-01T23:59:59.000Z

288

Compliance and Verification of Standards and Labelling Programs in China: Lessons Learned  

SciTech Connect

After implementing several energy efficiency standards and labels (30 products covered by MEPS, 50 products covered by voluntary labels and 19 products by mandatory labels), the China National Institute of Standardization (CNIS) is now implementing verification and compliance mechanism to ensure that the energy information of labeled products comply with the requirements of their labels. CNIS is doing so by organizing check testing on a random basis for room air-conditioners, refrigerators, motors, heaters, computer displays, ovens, and self -ballasted lamps. The purpose of the check testing is to understand the implementation of the Chinese labeling scheme and help local authorities establishing effective compliance mechanisms. In addition, to ensure robustness and consistency of testing results, CNIS has coordinated a round robin testing for room air conditioners. Eight laboratories (Chinese (6), Australian (1) and Japanese (1)) have been involved in the round robin testing and tests were performed on four sets of samples selected from manufacturer?s production line. This paper describes the methodology used in undertaking both check and round robin testing, provides analysis of testing results and reports on the findings. The analysis of both check and round robin testing demonstrated the benefits of a regularized verification and monitoring system for both laboratories and products such as (i) identifying the possible deviations between laboratories to correct them, (ii) improving the quality of testing facilities, (iii) ensuring the accuracy and reliability of energy label information in order to strength the social credibility of the labeling program and the enforcement mechanism in place.

Saheb, Yamina; Zhou, Nan; Fridley, David; Pierrot, Andr& #233

2010-06-11T23:59:59.000Z

289

Field verification program for small wind turbines  

DOE Green Energy (OSTI)

In 1999 Windward Engineering (Windward) was awarded a Cooperative Agreement under the Field Verification Program with the Department of Energy (DOE) to install two Whisper H40 wind turbines, one at the NREL National Wind Technology Center (NWTC) and one at a test site near Spanish Fork, Utah. After installation, the turbine at the NWTC was to be operated, maintained, and monitored by NREL while the turbine in Spanish Fork was to be administered by Windward. Under this award DOE and Windward defined the primary objectives of the project as follows: (1) Determine and demonstrate the reliability and energy production of a furling wind turbine at a site where furling will be a very frequent event and extreme gusts can be expected during the duration of the tests. (2) Make engineering measurements and conduct limited computer modeling of the furling behavior to improve the industry understanding of the mechanics and nature of furling. We believe the project has achieved these objectives. The turbine has operated for approximately three and a half years. We have collected detailed engineering data approximately 75 percent of that time. Some of these data were used in an ADAMS model validation that highlighted the accuracies and inaccuracies of the computer modeling for a passively furling wind turbine. We also presented three papers at the American Wind Energy Association (AWEA) Windpower conferences in 2001, 2002, and 2003. These papers addressed the following three topics: (a) general overview of the project [1], (b) furling operation during extreme wind events [2], and (c) extrapolation of extreme (design) loads [3]. We believe these papers have given new insight into the mechanics and nature of furling and have set the stage for future research. In this final report we will highlight some of the more interesting aspects of the project as well as summarize the data for the entire project. We will also present information on the installation of the turbines as well as the findings from the post-test inspection of the turbine.

Windward Engineering, LLC

2003-11-30T23:59:59.000Z

290

Commissioning/ verification : Daylighting The New York Times Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning/ verification Commissioning/ verification Overview The architectural approach The owner's approach Daylighting field study Daylighting control systems Automated roller shades Procurement specifications Shades and Shade Controls Lighting Controls Visualizing daylight Commissioning/ verification Demand response Mainstream solutions Post-occupancy evaluation Publications Sponsors Project team Commissioning/ verification The construction cycle of the building life cycle is the time when the design intent is translated into a physical reality. Given novel integrated systems with which contractors (vendors, installers, commissioning (Cx) agents, etc.) do not have much experience, there is a risk that carefully laid plans will go amiss. To insure that the automated shading and daylighting control systems were installed and operating as intended, the manufacturers, LBNL, and the Times Company developed procedures to commission and verify system performance. With verification data resulting from these procedures, the Times Company possessed the unique capability to measure and compare performance to design intent then discuss and tune system performance with the manufacturer prior to closure of the work scope and occupancy of the building.

291

Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)  

Science Conference Proceedings (OSTI)

The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3.1.5 and will be tracked as part of the CSB Facility action tracking system.

BAZINET, G.D.

2000-11-03T23:59:59.000Z

292

Sample M&V Plan from the Texas Workshop: Preparing and Evaluating Measurement and Verification Plans for Energy Performance Contracts in Texas  

E-Print Network (OSTI)

This document contains a sample M&V plan that has been prepared in accordance with the Texas Guidelines for Measurement and Verification for Energy Performance Contracts. This sample M&V plan was extracted from the March 1999 workshop, entitled: "Preparing and Evaluating Measurement and Verification Plans for Energy Performance Contracts in Texas", Sponsored by the Texas was developed by the Texas State Energy Coordinating Council, and the General Services Commission, State Energy Conservation Office. The M&V plan represents an actual Performance Contract that was approved by the TECC/SECO. This document is a public domain document that is intended to serve as an example document of an M&V plan. Certain manufacturer's trade names are mentioned in this document for the purpose of describing the types of equipment used to measure energy use. Such reference does not constitute an endorsement or recommendation of such equipment, and is provided for informational purposes only.

Haberl, J. S.

1999-01-01T23:59:59.000Z

293

Special purpose modes in photonic band gap fibers - Energy ...  

Solar Thermal; Startup ... Partners (27) Visual Patent Search; Success Stories; News; Events; Special purpose modes in ... Issued: April 2, 2013: ...

294

RENEWABLES PORTFOLIO STANDARD 2005 PROCUREMENT VERIFICATION  

E-Print Network (OSTI)

.44 If biogas is generated in Sacramento and used in LA, is this a viable pathway to meet biogas may be transported to a hydrogen production facility for the purposes of this solicitation the top where "renewable electricity" and "biogas/renewable feedstock" are required in the application

295

Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonaqueous-Phase Liquid Characterization and Post-Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling More Documents & Publications Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center

296

Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonaqueous-Phase Liquid Characterization and Post-Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling More Documents & Publications Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center

297

Energy Efficiency Measurement & Verification in South Africa  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Efficiency Measurement & Verification in South Africa Energy Efficiency Measurement & Verification in South Africa Speaker(s): Xiaohua Xia Date: December 17, 2012 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Stephane de la Rue du Can Measurement and verification (M&V) is the process of using measurements to reliably determine actual saving created within an individual facility by an energy management program. This talk will describe the basics of M&V, and introduce how M&V is conducted in the Republic of South Africa. Topics covered include the history of M&V in South Africa, the business structure, and the Eskom-led M&V protocols and guidelines of M&V. The talk will also present how the M&V profession is governed and regulated by the national professional body, the national standard (the first in the world), and a

298

Sandia National Laboratories: Advanced Simulation Computing: Verification &  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification & Validation Verification & Validation high-fidelity simulations The Verification and Validation (V&V) program conducts two major activities at Sandia. The first is to perform assessments and studies that quantify confidence in Advanced Simulation and Computing (ASC) calculation results. The second activity develops and improves V&V and uncertainty quantification methods, metrics, and standards. Assessments This project area conducts studies and assessments for Sandia's engineering simulation focus areas (outlined below). These assessments quantify the prediction uncertainty of the engineering codes as they apply to applications in the four focus areas. Safety and Security This area focuses on engineering codes as they apply to nuclear weapon. External load prediction capability includes mechanical (impact, pressure,)

299

Verification and validation of RADMODL Version 1.0  

Science Conference Proceedings (OSTI)

RADMODL is a system of linked computer codes designed to calculate the radiation environment following an accident in which nuclear materials are released. The RADMODL code and the corresponding Verification and Validation (V&V) calculations (Appendix A), were developed for Westinghouse Savannah River Company (WSRC) by EGS Corporation (EGS). Each module of RADMODL is an independent code and was verified separately. The full system was validated by comparing the output of the various modules with the corresponding output of a previously verified version of the modules. The results of the verification and validation tests show that RADMODL correctly calculates the transport of radionuclides and radiation doses. As a result of this verification and validation effort, RADMODL Version 1.0 is certified for use in calculating the radiation environment following an accident.

Kimball, K.D.

1993-03-01T23:59:59.000Z

300

Bibliography for Verification and Validation in Computational Simulations  

Science Conference Proceedings (OSTI)

A bibliography has been compiled dealing with the verification and validation of computational simulations. The references listed in this bibliography are concentrated in the field of computational fluid dynamics (CFD). However, references from the following fields are also included: operations research, heat transfer, solid dynamics, software quality assurance, software accreditation, military systems, and nuclear reactor safety. This bibliography, containing 221 references, is not meant to be comprehensive. It was compiled during the last ten years in response to the author's interest and research in the methodology for verification and validation. The emphasis in the bibliography is in the following areas: philosophy of science underpinnings, development of terminology and methodology, high accuracy solutions for CFD verification, experimental datasets for CFD validation, and the statistical quantification of model validation. This bibliography should provide a starting point for individual researchers in many fields of computational simulation in science and engineering.

Oberkampf, W.L.

1998-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Converter performance TFE Verification Program. Final test report  

DOE Green Energy (OSTI)

This report details TFE Verification Program, the objective, of which is to demonstrate the technology readiness of a TFE suitable for use as the basic element in a thermionic reactor with electric power output in the 0.5 to 5.0 MW(e) range, and a full-power life of 7 years. The TFE Verification Program built directly on the technology and data base developed in the 1960s and early 1970s in an AEC/NASA program, and in the SP-100 program conducted in 1983, 1984 and 1985. In the SP-100 program, the attractive features of thermionic power conversion technology were recognized but concern was expressed over the lack of fast reactor irradiation data. The TFE Verification Program addressed that concern.

Not Available

1994-03-01T23:59:59.000Z

302

Event:Technical Workshop: Measurement, Reporting and Verification (MRV):  

Open Energy Info (EERE)

Workshop: Measurement, Reporting and Verification (MRV): Workshop: Measurement, Reporting and Verification (MRV): Experiences from and for implementation Jump to: navigation, search Calendar.png Technical Workshop: Measurement, Reporting and Verification (MRV): Experiences from and for implementation: on 2012/06/26 "The workshop will deal with MRV issues relevant to negotiators and practitioners from Partnership member countries and aims at contributing to an in-depth understanding of key aspects critical to the implementation of MRV-systems in developing countries. The workshop will focus on the "how" of implementing MRV-systems in a pragmatic, sustainable and cost-efficient way while taking advantage of existing structures and experiences. Thus the event wants to move beyond the political discussions

303

A C-based RTL design verification methodology for complex microprocessor  

Science Conference Proceedings (OSTI)

As the complexity of high-performance microprocessor increases,functional verification becomes more and more difficultand RTL simulation emerges as the bottleneck of thedesign cycle.In this paper, we suggest C language-based designand verification methodology ...

Joon-Seo Yim; Yoon-Ho Hwang; Chang-Jae Park; Hoon Choi; Woo-Seung Yang; Hun-Seung Oh; In-Cheol Park; Chong-Min Kyung

1997-06-01T23:59:59.000Z

304

Hi-Lite: the convergence of compiler technology and program verification  

Science Conference Proceedings (OSTI)

Formal program verification tools check that a program correctly implements its specification. Existing specification languages for well-known programming languages (Ada, C, Java, C#) have been developed independently from the programming language to ... Keywords: compiler technology, formal verification, testing

Johannes Kanig; Edmond Schonberg; Claire Dross

2012-12-01T23:59:59.000Z

305

Comparison between CPBPV, ESC/Java, CBMC, Blast, EUREKA and Why for Bounded Program Verification  

E-Print Network (OSTI)

This report describes experimental results for a set of benchmarks on program verification. It compares the capabilities of CPBVP "Constraint Programming framework for Bounded Program Verification" [4] with the following frameworks: ESC/Java, CBMC, Blast, EUREKA and Why.

Collavizza, Hélène; Van Hentenryck, Pascal

2008-01-01T23:59:59.000Z

306

Subjective Verification of Numerical Models as a Component of a Broader Interaction between Research and Operations  

Science Conference Proceedings (OSTI)

Systematic subjective verification of precipitation forecasts from two numerical models is presented and discussed. The subjective verification effort was carried out as part of the 2001 Spring Program, a seven-week collaborative experiment ...

John S. Kain; Michael E. Baldwin; Paul R. Janish; Steven J. Weiss; Michael P. Kay; Gregory W. Carbin

2003-10-01T23:59:59.000Z

307

A Comparison of Measures-Oriented and Distributions-Oriented Approaches to Forecast Verification  

Science Conference Proceedings (OSTI)

The authors have carried out verification of 590 12–24-h high-temperature forecasts from numerical guidance products and human forecasters for Oklahoma City, Oklahoma, using both a measures-oriented verification scheme and a distributions-...

Harold E. Brooks; Charles A. Doswell III

1996-09-01T23:59:59.000Z

308

Runtime verification of service-oriented systems: a well-rounded survey  

Science Conference Proceedings (OSTI)

Dynamic nature of Service-Oriented Systems SOSs has made conventional verification techniques such as testing, model checking and theorem proving ineffective. As a result, many studies have been dedicated to verification of SOS. In this survey, we first ...

Reza Babaee; Seyed Morteza Babamir

2013-08-01T23:59:59.000Z

309

Using purposeful perturbations as a strategy for school reform : a design experiment at an alternative high school with low-performing students  

E-Print Network (OSTI)

interviews 47 Artifact  Elicited  Response  Technique .interviews. The technique, as used during interviews, was tointerviews. The technique, as used during interviews, was to

White, David G.

2011-01-01T23:59:59.000Z

310

Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, June 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Site Office's Compliance with Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1 1.0 Purpose .................................................................................................................................................. 1 2.0 Introduction ........................................................................................................................................... 1 3.0 Assessment Methodologies and Approach ........................................................................................... 1

311

Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, June 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantex Site Office's Compliance with Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1 1.0 Purpose .................................................................................................................................................. 1 2.0 Introduction ........................................................................................................................................... 1 3.0 Assessment Methodologies and Approach ........................................................................................... 1

312

Independent Verification and Validation Of SAPHIRE 8 Volume 3 Users' Guide Project Number: N6423 U.S. Nuclear Regulatory Commission  

Science Conference Proceedings (OSTI)

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Volume 3 Users’ Guide is to assess the user documentation for its completeness, correctness, and consistency with respect to requirements for user interface and for any functionality that can be invoked by the user. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

Kent Norris

2010-03-01T23:59:59.000Z

313

Independent Verification Survey Report for the Long Island Solar Farm, Brookhaven National Laboratory, Upton, New York  

DOE Green Energy (OSTI)

5119-SR-01-0 INDEPENDENT VERIFICATION SURVEY REPORT FOR THE LONG ISLAND SOLAR FARM, BROOKHAVEN NATIONAL LABORATORY

E.M. Harpenau

2010-11-15T23:59:59.000Z

314

INDEPENDENT VERIFICATION REVIEW AND SURVEY of the Argonne National Laboratory Building 301 Footprint  

SciTech Connect

INDEPENDENT VERIFICATION REVIEW AND SURVEY of the Argonne National Laboratory Building 301 Footprint, Argonne Illinois 5061-SR-01-0

E.N. Bailey

2010-05-26T23:59:59.000Z

315

Field Verification of Distributed Renewable Generation, Volume 1: Renewable Energy Field Test Concepts  

Science Conference Proceedings (OSTI)

This report describes field verification of distributed renewable generation and focuses on renewable energy field test concepts.

2003-03-25T23:59:59.000Z

316

Formal hardware specification languages for protocol compliance verification  

Science Conference Proceedings (OSTI)

The advent of the system-on-chip and intellectual property hardware design paradigms makes protocol compliance verification increasingly important to the success of a project. One of the central tools in any verification project is the modeling language, ... Keywords: Esterel, Heterogeneous Hardware Logic, Hierarchical Annotated Action Diagrams, Java, Lava, Live Sequence Charts, Message Sequence Charts, Objective VHDL, OpenVera, Property Specification Language, SpecC, Specification and Description Language, Statecharts, SystemC, SystemVerilog, The Unified Modeling Language, e, hardware monitors, timing diagrams

Annette Bunker; Ganesh Gopalakrishnan; Sally A. Mckee

2004-01-01T23:59:59.000Z

317

Certification and verification for Northrup Model NSC-01-0732 Fresnel lens concentrating solar collector  

DOE Green Energy (OSTI)

The certification and verification of the Northrup Model NSC-01-0732 Fresnel lens tracking solar collector are presented. A certification statement is included with signatures and a separate report on the structural analysis of the collector system. System verification against the Interim Performance Criteria are indicated by matrices with verification discussion, analysis, and enclosed test results.

Not Available

1979-03-01T23:59:59.000Z

318

9:00 Opening and Welcome (Exactum Building Auditorium) Session 1: User-oriented Verification  

E-Print Network (OSTI)

of user-orientation in verification 9:50 1.2 Clive Wilson: Do key performance targets work? 10:10 1.3 Tressa Fowler: Wind forecast verification 10:30 1.4 Robert Maisha: UM model and Kalman Filter forecast verification at SAWS

Chair Pertti Nurmi

2009-01-01T23:59:59.000Z

319

Reusing a JML Specification Dedicated to Verification for Testing, and Vice-Versa: Case Studies  

Science Conference Proceedings (OSTI)

Testing and verification are two activities which have the same objective: to ensure software dependability. In the Java context, the Java Modelling Language (JML) has been proposed as specification language. It can be used both for verification and ... Keywords: JML, Java, Software dependability, Testing, Verification

Lydie Du Bousquet; Yves Ledru; Olivier Maury; Catherine Oriat; Jean-Louis Lanet

2010-12-01T23:59:59.000Z

320

Evaluation, Measurement, and Verification (EM&V) of Residential Behavior-Based  

E-Print Network (OSTI)

Evaluation, Measurement, and Verification (EM&V) of Residential Behavior-Based Energy Efficiency Evaluation, Measurement, and Verification (EM&V) of Residential Behavior-Based Energy Efficiency Programs Efficiency Action Network. 2012. Evaluation, Measurement, and Verification (EM&V) of Residential Behavior

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Verification of Scientific Simulations via Hypothesis-Driven Comparative and Quantitative Visualization  

Science Conference Proceedings (OSTI)

This article presents a visualization-assisted process that verifies scientific-simulation codes. Code verification is necessary because scientists require accurate predictions to interpret data confidently. This verification process integrates iterative hypothesis verification with comparative, feature, and quantitative visualization. Following this process can help identify differences in cosmological and oceanographic simulations.

Ahrens, James P [ORNL; Heitmann, Katrin [ORNL; Petersen, Mark R [ORNL; Woodring, Jonathan [Los Alamos National Laboratory (LANL); Williams, Sean [Los Alamos National Laboratory (LANL); Fasel, Patricia [Los Alamos National Laboratory (LANL); Ahrens, Christine [Los Alamos National Laboratory (LANL); Hsu, Chung-Hsing [ORNL; Geveci, Berk [ORNL

2010-11-01T23:59:59.000Z

322

Review: Formal verification of analog and mixed signal designs: A survey  

Science Conference Proceedings (OSTI)

Analog and mixed signal (AMS) designs are an important part of embedded systems that link digital designs to the analog world. Due to challenges associated with its verification process, AMS designs require a considerable portion of the total design ... Keywords: Analog and mixed signal design verification, Formal verification, Survey

Mohamed H. Zaki; Sofiène Tahar; Guy Bois

2008-12-01T23:59:59.000Z

323

Guidance to Completing the Self-Directed RBSM Interview Form | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review process and provide the reviewer with some of the rationale behind the questions that are asked. This companion piece does not emulate the exact order of the review process interview form but rather, attempts to address the major pathways that may be followed along the way to selecting a given disposition category. Guidance to Completing the Self-Directed RBSM Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and

324

Guidance to Completing the Self-Directed RBSM Interview Form | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review process and provide the reviewer with some of the rationale behind the questions that are asked. This companion piece does not emulate the exact order of the review process interview form but rather, attempts to address the major pathways that may be followed along the way to selecting a given disposition category. Guidance to Completing the Self-Directed RBSM Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and

325

Health Profile of California's Adolescents: Findings from the 2001 California Health Interview Survey  

E-Print Network (OSTI)

HEALTH PROFILE OF CALIFORNIA’S ADOLESCENTS: FINDINGSFROM THE 2001 CALIFORNIA HEALTH INTERVIEW SURVEY UCLA CenterPopulation: U.S. and California, 2000 Exhibit 2. Adolescent

2005-01-01T23:59:59.000Z

326

The State of Health Insurance in California: Findings from the 2003 California Health Interview Survey  

E-Print Network (OSTI)

SUITE 300 LOS ANGELES, CALIFORNIA 90024 PHONE: (310) 794-Health Insurance California in Findingsfrom the 2003 California Health Interview Survey The State

Brown, E. Richard; Lavarreda, Shana Alex; Rice, Thomas; Kincheloe, Jennifer R.; al., et

2005-01-01T23:59:59.000Z

327

Diabetes in California: Findings from the 2001 California Health Interview Study  

E-Print Network (OSTI)

HEALTH POLICY RESEARCH DIABETES IN CALIFORNIA: FINDINGS FROMTHE 2001 CALIFORNIA HEALTH INTERVIEW SURVEY UCLA CENTER FORSUITE 300 LOS ANGELES, CALIFORNIA 90024 PHONE: (310) 794-

Diamant, Allison L.; Babey, Susan H.; Brown, E. Richard R; Chawla, Neetu

2003-01-01T23:59:59.000Z

328

The State of Health Insurance in California: Findings from the 2007 California Health Interview Survey  

E-Print Network (OSTI)

Suite 1550 Los Angeles, California 90024 Phone: 310.794.0909State of Health Insurance in California August 2009 Findingsfrom the 2007 California Health Interview Survey E. Richard

Brown, Richard E.; Kronick, Richard; Kincheloe, Jennifer R.; Lavarreda, Shana Alex; Peckham, Erin

2009-01-01T23:59:59.000Z

329

The State of Health Insurance in California: Findings from the 2005 California Health Interview Study  

E-Print Network (OSTI)

THE STATE OF HEALTH INSURANCE IN CALIFORNIA FINDINGS FROMTHE 2005 CALIFORNIA HEALTH INTERVIEW SURVEY JULY 2007 E.by grants from The California Endowment and The California

Brown, E. Richard; Lavarreda, Shana Alex; Ponce, Ninez; Yoon, Jean; al., et

2007-01-01T23:59:59.000Z

330

Integrated Framework toward a Closed Loop Measurement and Verification  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Framework toward a Closed Loop Measurement and Verification Integrated Framework toward a Closed Loop Measurement and Verification Approach Title Integrated Framework toward a Closed Loop Measurement and Verification Approach Publication Type Conference Proceedings Year of Publication 2011 Authors Earni, Shankar, Philip Coleman, and Mark D. Sanders Conference Name ACEEE Summer Study on Energy Efficiency in Industry Volume 1 Pagination 68-79 Date Published 1/2011 Abstract This study reviews a sample set of measurement and verification (M&V) plans from federal ESPC projects to understand and assess the overall status of M&V practices. The review identifies some of the key issues that need to be addressed to improve the rigor and transparency of M&V practices. To mitigate some of the identified M&V issues, this work also reviews existing M&V protocols, guidelines and other pertinent literature to identify strategies that can augment traditional M&V approaches. The authors provide a framework to identify ways to integrate M&V and commissioning activities into the ESPC process, combining M&V activities and advanced meter data into a monitoring-based commissioning approach that reduces the uncertainty of savings while ensuring their persistence.

331

Department of Computing CSP||B modelling for railway verification  

E-Print Network (OSTI)

University of Surrey Department of Computing Computing Sciences Report CS-12-03 CSP||B modelling Schneider Helen Treharne March 30th 2012 #12;CSP||B modelling for railway verification: the double junction work in verifying railway systems through CSP k B modelling and analysis. In particular we consider

Doran, Simon J.

332

Verification of temporal scheduling constraints in clinical practice guidelines  

Science Conference Proceedings (OSTI)

The computerization of clinical practice guidelines is a significant scientific challenge for the medical informatics community. One frequently reported factor hindering this objective is the existence of deficiencies within guideline knowledge. In this ... Keywords: Clinical practice guidelines, Medical plan management, Temporal constraint satisfaction, Verification

Georg Duftschmid; Silvia Miksch; Walter Gall

2002-06-01T23:59:59.000Z

333

Verification of clear-air turbulence forecasts June 2002, KNMI  

E-Print Network (OSTI)

to increase potential energy. Under these conditions turbulence will increase in intensity until different weather conditions. It often occurs in relatively clear skies and is then referred to as clear-airVerification of clear-air turbulence forecasts A. Overeem June 2002, KNMI Technisch rapport #12

Stoffelen, Ad

334

Fast Verification of Wind Turbine Power Summary of Project Results  

E-Print Network (OSTI)

a wind turbine's design phase, the power curve can be predicted using analytical techniques such as Blade using a single cup anemometer at the wind turbine's hub height and it is assumed that this measurementFast Verification of Wind Turbine Power Curves: Summary of Project Results by: Cameron Brown ­ s

335

An integrated verification environment for JML: architecture and early results  

Science Conference Proceedings (OSTI)

Tool support for the Java Modeling Language (JML) is a very pressing problem. A main issue with current tools is their architecture: the cost of keeping up with the evolution of Java is prohibitively high: e.g., almost three years following its release, ... Keywords: Eclipse, JML4, integrated verification environment, java modeling language

Patrice Chalin; Perry R. James; George Karabotsos

2007-09-01T23:59:59.000Z

336

Modified Segmental Histogram Equalization for robust speaker verification  

Science Conference Proceedings (OSTI)

It is well known that when there is an acoustic mismatch between the speech obtained during training and testing the accuracy of speaker recognition systems drastically deteriorates. In this paper we propose Modified Segmental Histogram Equalization ... Keywords: Histogram Equalization, Mismatched conditions, NIST 2000, Speaker verification

Marshalleno Skosan; Daniel Mashao

2006-04-01T23:59:59.000Z

337

Project W-320, WRSS PCP: Procedure implementation verification  

SciTech Connect

This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List.

Bailey, J.W.

1998-07-25T23:59:59.000Z

338

On Automatic Authenticity Verification of Printed Security Documents  

Science Conference Proceedings (OSTI)

This paper presents a pioneering effort to involve machine in checking document authenticity. A particular class of security documents has been considered for the present experiment. Bank cheques, several kinds of tickets like lottery tickets, air tickets, ... Keywords: authenticity verification, security document, forensic document examination, bank cheques

Utpal Garain; Biswajit Halder

2008-12-01T23:59:59.000Z

339

Object Oriented Verification Kernels for Secure Java Applications  

Science Conference Proceedings (OSTI)

This paper presents an approach to the verification of large Java programs. The focus lies on programs that implement a distributed communicating system e.g. in a Mor E-Commerce scenario. When trying to verify such programs, thousands of Java classes ...

Holger Grandy; Kurt Stenzel; Wolfgang Reif

2005-09-01T23:59:59.000Z

340

ProMoVer: modular verification of temporal safety properties  

Science Conference Proceedings (OSTI)

This paper describes ProMoVer, a tool for fully automated procedure-modular verification of Java programs equipped with method-local and global assertions that specify safety properties of sequences of method invocations. Modularity at the procedure-level ...

Siavash Soleimanifard; Dilian Gurov; Marieke Huisman

2011-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Specification and Runtime Verification of Java Card Programs  

Science Conference Proceedings (OSTI)

Java Card is a version of Java developed to run on devices with severe storage and processing restrictions. The applets that run on these devices are frequently intended for use in critical, highly distributed, mobile conditions. They are required to ... Keywords: Compiler, JCML, JML, Java Card, Runtime Verification

Umberto Souza da Costa; Anamaria Martins Moreira; Martin A. Musicante; Plácido A. Souza Neto

2009-07-01T23:59:59.000Z

342

Markov and fuzzy models for written language verification  

Science Conference Proceedings (OSTI)

This paper presents a computational algorithm for machine classification of written languages using the Markov chain-based method for building language models and the fuzzy set theory-based normalization method to verify language. For a language document, ... Keywords: Markov chain, fuzzy normalization method, written language verification

Dat T. Tran; Tuan D. Pham

2005-06-01T23:59:59.000Z

343

Roadmap for enhanced languages and methods to aid verification  

Science Conference Proceedings (OSTI)

This roadmap describes ways that researchers in four areas---specification languages, program generation, correctness by construction, and programming languages---might help further the goal of verified software. It also describes what advances the "verified ... Keywords: annotations, correctness by construction, program generation, programming languages, specification languages, tools, verification, verified software grand challenge

Gary T. Leavens; Jean-Raymond Abrial; Don Batory; Michael Butler; Alessandro Coglio; Kathi Fisler; Eric Hehner; Cliff Jones; Dale Miller; Simon Peyton-Jones; Murali Sitaraman; Douglas R. Smith; Aaron Stump

2006-10-01T23:59:59.000Z

344

Hybrid systems modeling and verification with DEVS (WIP)  

Science Conference Proceedings (OSTI)

Hybrid systems (where continuous and discrete phenomena interact) are found in many natural and artificial systems. An important example, real-time embedded systems usually include discrete-event controllers interacting with a continuous plant. Verifying ... Keywords: DEVS, hybrid systems verification, quantized state systems QSS, timed automata

Hesham Saadawi, Gabriel Wainer

2013-04-01T23:59:59.000Z

345

A special-purpose language for picture-drawing  

Science Conference Proceedings (OSTI)

Special purpose languages are typically characterized by a type of primitive data and domain-specific operations on this data. One approach to special purpose language design is to embed the data and operations of the language within an existing functional ...

Samuel N. Kamin; David Hyatt

1997-10-01T23:59:59.000Z

346

For discussion purposes only Biofuel and Poverty Nexus  

E-Print Network (OSTI)

For discussion purposes only Biofuel and Poverty Nexus in Asia 13th Poverty and Environment Partnership Meeting Myo Thant Manila, 11 June 2008 #12;For discussion purposes only Interest in Biofuels has and policies · Number of countries · Different biofuel feedstock · Research on second generation technology #12

347

GXQ program verification and validation. Revision 1  

Science Conference Proceedings (OSTI)

This report documents the program user`s guide of a general purpose atmospheric dispersion code named GXQ. GXQ is an IBM Compatible microcomputer based program for calculating atmospheric dispersion coefficients using Hanford site specific joint frequency data. It uses the Gaussian straight line model to calculate either an atmospheric dispersion coefficient (X/Q{prime}) or a maximum normalized air concentration (X/Q). Several options are available to the user which alter the standard Gaussian model to allow for plume depletion, building wake, plume meander, sector averaging, gravitational settling and plume rise. Additional options control handling of the joint frequency data and output. Combinations of the above allow calculation of X/Q{prime} in accordance with Nuclear Regulatory Commission Regulatory Guide 1.145. The GXQ source code listing is provided in an appendix.

Hey, B.E.

1995-05-10T23:59:59.000Z

348

U. S. Government purposes. Introduction Design of Kicker Magnet...  

NLE Websites -- All DOE Office Websites (Extended Search)

The purpose of adding resistors to the capacitors is to minimize the reflection when the voltage and current waveforms travel from the PFN to the magnet. 2. Pulse Forming Network...

349

Construction noise prediction and barrier optimization using special purpose simulation  

Science Conference Proceedings (OSTI)

Construction projects produce serious environmental pollution and great annoyance to the neighbouring community due to construction noise. This paper presents an application of the special purpose simulation (SPS) language using Simphony software to ...

Anupama Gannoruwa; Janaka Y. Ruwanpura

2007-12-01T23:59:59.000Z

350

ENERGY STAR Test Procedures and Verification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENERGY STAR » ENERGY STAR Test ENERGY STAR » ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the lead agency in the development and revision of all test procedures for products in the ENERGY STAR® program, including those products that are also subject to DOE's Energy Conservation Standards program. As specifications are updated and new products or metrics are added to the ENERGY STAR program, DOE is responsible for developing and revising methods, responding to stakeholder comments, and answering any testing-related questions that arise as a result of the procedures being utilized. To simplify the process for interested parties, more information on the test procedure development for ENERGY STAR products can be found on each of

351

VERIFICATION SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES  

Office of Legacy Management (LM)

~ *-,-' .r_~, ~ *-,-' .r_~, VERIFICATION SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES BUILDING 513-519 NEW YORK, NEW YORK Prepared by W. C. Adams Environmental Survey and Site Assessment Program Energy/Environment Systems Division Oak Ridge Institute for Science and Education Oak Ridge, Tennessee 37831-0117 Prepared for the Office of Environmental Restoration U.S. Department of Energy FINAL REPORT JUNE 1994 This report is based on work performed under contract number DE-AC05-760R00033 with the U.S. Department of Energy. Baker arId Wi,,iMI Wsrchouwl-Vcrification June 28, ,994 - ,I I_ ..I .- VERIFICATION SURVEY OF THE BAKER AND W ILLIAMS WAREHOUSES BUILDING 513-519 NEW YORK, NEW YORK Prepared by: ' J .,,,~ ' . W . C. Adams, Project Leader Date: Environmental Survey and Site Assessment Program

352

NETL: Methane Hydrates - DOE/NETL Projects - Verification Of Capillary  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification Of Capillary Pressure Functions And Relative Permeability Equations For Modeling Gas Production From Gas Hydrates Last Reviewed 12/12/2013 Verification Of Capillary Pressure Functions And Relative Permeability Equations For Modeling Gas Production From Gas Hydrates Last Reviewed 12/12/2013 DE-FE0009927 Goal The goal of this project is to verify and validate the capillary pressure functions and relative permeability equations that are frequently used in hydrate numerical simulators. In order to achieve this goal, numerical simulation using a network model will be used to suggest fitting parameters, modify existing equations or, if necessary, develop new equations for better simulation results. Performers Wayne State University, Detroit, MI 48202-3622 Background Numerical simulation is used to estimate and predict long-term behavior of hydrate-bearing sediments during gas production [Kurihara et al., 2008;

353

Oak Ridge Associated VERIFICATION SURVEY Universities OF THE  

Office of Legacy Management (LM)

ORAU 89/K-79 ORAU 89/K-79 Prepared by ERIFICATION Oak Ridge Associated VERIFICATION SURVEY Universities OF THE Drepared of SHIPPINGPORT ATOMIC POWER STATION Facility and Site Decommissioning SHIPPINGPORT, PENNSYLVANIA I Projects U.S. Department R LANDIS ot Energy M. R. LANDIS ot Energy Environmental Survey and Site Assessment Program Energy/Environment Systems Division FINAL REPORT .i~ ~~ . ~NOVEMBER 1989 .Ii_- ORAU 89/K-79 VERIFICATION SURVEY OF THE SHIPPINGPORT ATOMIC POWER STATION SHIPPINGPORT, PENNSYLVANIA Prepared by M. R. Landis Environmental Survey and Site Assessment Program Energy/Environment Systems Division Oak Ridge Associated Universities 3*P~~~ ~~Oak Ridge, Tennessee 37831-0117 U~~~~~~~~1 ~Project Staff S. F. Barnett F. A. Payne J. D. Berger J. L. Payne G. R. Foltz E. A. Powell

354

Microsoft Word - S0191800 - Gunnison Verification Monitoring Report 0906.doc  

Office of Legacy Management (LM)

6 6 Office of Legacy Management DOE M/1305-2006 -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy S0191800 DOE-LM/1305-2006 Office of Legacy Management Verification Monitoring Report for the Gunnison, Colorado, Processing Site September 2006 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy 2006 Verification Monitoring Report-Gunnison, Colorado, Processing Site September 2006 Doc. No. S0191800

355

Fueled emitter final test report TFE Verification Program  

DOE Green Energy (OSTI)

The program objective is to demonstrate the technology readiness of a TFE suitable for use as the basic element in a thermionic reactor with electric power output in the 0.5 to 5.0 MW(e) range, and a full-power life of 7 years. The TFE Verification Program built directly on the technology and data base developed in the 1960s and early 1970s in an AEC/NASA program, and in the SP-100 program conducted in 1983, 1984 and 1985. In the SP-100 program, the attractive features of thermionic power conversion technology were recognized but concern was expressed over the lack of fast reactor irradiation data. The TFE Verification Program addressed that concern.

Not Available

1994-07-01T23:59:59.000Z

356

Parameterized Verification of Safety Properties in Ad Hoc Network Protocols  

E-Print Network (OSTI)

We summarize the main results proved in recent work on the parameterized verification of safety properties for ad hoc network protocols. We consider a model in which the communication topology of a network is represented as a graph. Nodes represent states of individual processes. Adjacent nodes represent single-hop neighbors. Processes are finite state automata that communicate via selective broadcast messages. Reception of a broadcast is restricted to single-hop neighbors. For this model we consider a decision problem that can be expressed as the verification of the existence of an initial topology in which the execution of the protocol can lead to a configuration with at least one node in a certain state. The decision problem is parametric both on the size and on the form of the communication topology of the initial configurations. We draw a complete picture of the decidability and complexity boundaries of this problem according to various assumptions on the possible topologies.

Delzanno, Giorgio; Zavattaro, Gianluigi; 10.4204/EPTCS.60.4

2011-01-01T23:59:59.000Z

357

SEEC- Regional Energy Baselines and Measurement and Verification Protocols  

E-Print Network (OSTI)

The Southern Energy Efficiency Center (SEEC) was established to substantially increase the deployment of high-performance “beyond-code” buildings across the southern region of the U.S, funded by the U.S. Department of Energy (DOE) Building Technologies Program and is administered by the National Energy Technology Laboratory. During its first 18-month phase, to address efficiency goals of states, utilities, and various energy-efficiency programs; project efforts include defining the baseline energy patterns within the project region and the measurement and verification (M&V) protocols for use in determining the efficiency improvements SEEC, state and USDOE efforts with respect to that baseline. This work is defined under the SEEC Subtask 3.1 Define Regional Baselines and Measurement & Verification Protocols. This report presents preliminary deliverables of this subtask developed and documented by the Energy Systems Laboratory (ESL) for use by the SEEC member state region.

Kim, H.; Haberl, J. S.; Verdict, M.

2009-03-01T23:59:59.000Z

358

Slicing Concurrent Real-Time System Specifications for Verification  

E-Print Network (OSTI)

The high-level specification language CSP-OZ-DC has been shown to be well-suited for modelling and analysing industrially relevant concurrent real-time systems. It allows us to model each of the most important functional aspects such as control flow, data, and real-time requirements in adequate notations, maintaining a common semantic foundation for subsequent verification. Slicing on the other hand has become an established technique to complement the fight against state space explosion during verification which inherently accompanies increasing system complexity. In this paper, we exploit the special structure of CSP-OZ-DC specifications by extending the dependence graph—which usually serves as a basis for slicing—with several new types of dependencies, including timing dependencies derived from the specification’s DC part. Based on this we show how to compute a specification slice and prove correctness of our approach.

Ingo Brückner

2007-01-01T23:59:59.000Z

359

Probabilistic Forecasts of (Severe) Thunderstorms for the Purpose of Issuing a Weather Alarm in the Netherlands  

Science Conference Proceedings (OSTI)

The development and verification of a new model output statistics (MOS) system is described; this system is intended to help forecasters decide whether a weather alarm for severe thunderstorms, based on high total lightning intensity, should be ...

Maurice J. Schmeits; Kees J. Kok; Daan H. P. Vogelezang; Rudolf M. van Westrhenen

2008-12-01T23:59:59.000Z

360

Handbook for Verification and Validation of Digital Systems  

Science Conference Proceedings (OSTI)

With the increasing use of digital instrumentation and control systems in power plants, utilities must determine the dependability and predictability of such systems and their software. This updated handbook provides a comprehensive guide to help utilities understand the verification and validation (V&V) process. The handbook presents a graded approach to select convenient V&V methods, develop a V&V plan, generate necessary documentation, and conduct appropriate V&V activities.

1998-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

AHAM Letter Acknowledging DOE Letter on Verification Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2013 26, 2013 By E-Mail Ms. Kathleen B. Hogan Deputy Assistant Secretary for Energy Efficiency Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0121 Dear Ms. Hogan: I am writing regarding your letter dated April 26, 2013, in which the U.S. Department of Energy (DOE or the Department) adopted a new policy regarding DOE ENERGY STAR verification

362

Verification and validation guidelines for high integrity systems. Volume 1  

SciTech Connect

High integrity systems include all protective (safety and mitigation) systems for nuclear power plants, and also systems for which comparable reliability requirements exist in other fields, such as in the process industries, in air traffic control, and in patient monitoring and other medical systems. Verification aims at determining that each stage in the software development completely and correctly implements requirements that were established in a preceding phase, while validation determines that the overall performance of a computer system completely and correctly meets system requirements. Volume I of the report reviews existing classifications for high integrity systems and for the types of errors that may be encountered, and makes recommendations for verification and validation procedures, based on assumptions about the environment in which these procedures will be conducted. The final chapter of Volume I deals with a framework for standards in this field. Volume II contains appendices dealing with specific methodologies for system classification, for dependability evaluation, and for two software tools that can automate otherwise very labor intensive verification and validation activities.

Hecht, H.; Hecht, M.; Dinsmore, G.; Hecht, S.; Tang, D. [SoHaR, Inc., Beverly Hills, CA (United States)

1995-03-01T23:59:59.000Z

363

Monitoring and Commissioning Verification Algorithms for CHP Systems  

Science Conference Proceedings (OSTI)

This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

Brambley, Michael R.; Katipamula, Srinivas; Jiang, Wei

2008-03-31T23:59:59.000Z

364

General-Purpose Heat Source development: Extended series test program large fragment tests  

SciTech Connect

General-Purpose Heat Source radioisotope thermoelectric generators (GPHS-RTGs) will provide electric power for the NASA Galileo and European Space Agency Ulysses missions. Each GPHS-RTG comprises two major components: GPHS modules, which provide thermal energy, and a thermoelectric converter, which converts the thermal energy into electric power. Each of the 18 GPHS modules in a GPHS-RTG contains four /sup 238/PuO/sub 2/-fueled capsules. LANL conducted a series of safety verification tests on the GPHS-RTG before the scheduled May 1986 launch of the Galileo spacecraft to assess the ability of the GPHS modules to contain the plutonia in potential accident environments. As a result of the Challenger 51-L accident in January 1986, NASA postponed the launch of Galileo; the launch vehicle was reconfigured and the spacecraft trajectory was modified. These actions prompted NASA to reevaluate potential mission accidents, and an extended series safety test program was initiated. The program included a series of large fragment tests that simulated the collision of solid rocket booster (SRB) fragments, generated in an SRB motor case rupture or resulting from a range safety officer SRB destruct action, with the GPHS-RTG. The tests indicated that fueled clads, inside a converter, will not breach or release fuel after a square (142 cm on a side) SRB fragment impacts flat-on at velocities up to 212 m/s, and that only the leading fueled capsules breach and release fuel after the square SRB fragment impacts the modules, inside the converter, edge-on at 95 m/s. 8 refs., 32 figs., 7 tabs.

Cull, T.A.

1989-08-01T23:59:59.000Z

365

Practical aspects of dynamic verification of extensometers; Part 1 -- The concepts  

SciTech Connect

Material property studies frequently require the measurement of load and strain. Accurate measurement of both parameters is essential. Methods for accurate static calibration and verification of load transducers and extensometers are well established. More recently, standard practices have been developed for the dynamic calibration of load transducers. Still in its infancy is a standard method for dynamic verification of extensometers. Dynamic verification introduces a wide range of new issues. These encompass not only the transducer but also the conditioning electronics and actual test machine. Static calibration permits the elimination of nearly all dynamics, whereas dynamic verification must be done in the presence of these dynamic effects. This paper outlines the various concepts that need to be understood when performing the dynamic verification of an extensometer. Problems related to computer aided verification are emphasized, issues of aliasing and resolution in particular.

Albright, F.J.; Annala, J. (MTS Systems Corp., Eden Prairie, MN (United States))

1994-01-01T23:59:59.000Z

366

Wind Turbine Verification Project Experience: 1999: U.S. Department of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

EPRI and the U.S. Department of Energy (DOE) initiated the Turbine Verification Program (TVP) in 1992 to evaluate prototype advanced wind turbines and to provide a bridge from development programs to commercial purchases. This report provides an overview and comparisons of site and operating experiences at the seven TVP projects in Ft. Davis, Texas; Searsburg, Vermont; Kotzebue, Alaska; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; and Big Spring, Texas. The lessons learned throughout the prog...

2000-12-12T23:59:59.000Z

367

Video Rental Store: An Interview with Suzanne Carte-Blanchenot and Su-Ying Lee  

E-Print Network (OSTI)

Video Rental Store An Interview with Suzanne Carte-of Under New Management’s Video Rental Store in Toronto,by the project’s name, Video Rental Store takes on the video

Hogan, Mél

2010-01-01T23:59:59.000Z

368

INDEPENDENT VERIFICATION SURVEY REPORT OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT  

Science Conference Proceedings (OSTI)

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-03-0

W.C. Adams

2010-07-21T23:59:59.000Z

369

REVISED INDEPENDENT VERIFICATION SURVEY OF A AND B RADIOACTIVE WASTE TRANSFER LINES TRENCH BROOKHAVEN NATIONAL LABORATORY  

SciTech Connect

REVISED INDEPENDENT VERIFICATION SURVEY OF THE A AND B RADIOACTIVE WASTE TRANSFER LINES TRENCH, BROOKHAVEN NATIONAL LABORATORY 5062-SR-01-1

P.C. Weaver

2010-02-10T23:59:59.000Z

370

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT  

SciTech Connect

INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0

W.C. Adams

2010-05-24T23:59:59.000Z

371

Safeguards Verification Measurements using Laser Ablation, Absorbance Ratio Spectrometry in Gaseous Centrifuge Enrichment Plants  

Science Conference Proceedings (OSTI)

Laser Ablation Absorbance Ratio Spectrometry (LAARS) is a new verification measurement technology under development at the US Department of Energy’s (DOE) Pacific Northwest National Laboratory (PNNL). LAARS uses three lasers to ablate and then measure the relative isotopic abundance of uranium compounds. An ablation laser is tightly focused on uranium-bearing solids producing a small plume containing uranium atoms. Two collinear wavelength-tuned spectrometry lasers transit through the plume and the absorbance of U-235 and U-238 isotopes are measured to determine U-235 enrichment. The measurement has high relative precision and detection limits approaching the femtogram range for uranium. It is independent of chemical form and degree of dilution with nuisance dust and other materials. High speed sample scanning and pinpoint characterization allow measurements on millions of particles/hour to detect and analyze the enrichment of trace uranium in samples. The spectrometer is assembled using commercially available components at comparatively low cost, and features a compact and low power design. Future designs can be engineered for reliable, autonomous deployment within an industrial plant environment. Two specific applications of the spectrometer are under development: 1) automated unattended aerosol sampling and analysis and 2) on-site small sample destructive assay measurement. The two applications propose game-changing technological advances in gaseous centrifuge enrichment plant (GCEP) safeguards verification. The aerosol measurement instrument, LAARS-environmental sampling (ES), collects aerosol particles from the plant environment in a purpose-built rotating drum impactor and then uses LAARS-ES to quickly scan the surface of the impactor to measure the enrichments of the captured particles. The current approach to plant misuse detection involves swipe sampling and offsite analysis. Though this approach is very robust it generally requires several months to obtain results from a given sample collection. The destructive assay instrument, LAARS-destructive assay (DA), uses a simple purpose-built fixture with a sampling planchet to collect adsorbed UF6 gas from a cylinder valve or from a process line tap or pigtail. A portable LAARS-DA instrument scans the microgram quantity of uranium collected on the planchet and the assay of the uranium is measured to ~0.15% relative precision. Currently, destructive assay samples for bias defect measurements are collected in small sample cylinders for offsite mass spectrometry measurement.

Anheier, Norman C.; Cannon, Bret D.; Qiao, Hong (Amy); Phillips, Jon R.

2012-07-01T23:59:59.000Z

372

Potential of Malaysian activated carbon in dual purpose adsorption system  

Science Conference Proceedings (OSTI)

The adsorption capability of some locally produced activated charcoal (coconut shell) samples with methanol were taken under laboratory conditions. An experimental test rig was set up; data obtained from the experiments were fitted to Dubinin-Radushkevitch ... Keywords: Malaysian activated carbon, adsorption properties, coefficient of performance (COP), dual purpose system

M. A. Alghoul; M. Y. Sulaiman; K. Sopian; M. Yahya; Azami Zaharim

2008-11-01T23:59:59.000Z

373

Purpose-designed Crop Plants for Biofuels BIOENERGY PROGRAM  

E-Print Network (OSTI)

Purpose-designed Crop Plants for Biofuels BIOENERGY PROGRAM The Texas AgriLife Research Center for the biofuels industry. This program recognizes that the ideal combination of traits required for an economically and energetically sustainable biofuels industry does not yet exist in a single plant spe- cies

374

Validation of music metadata via game with a purpose  

Science Conference Proceedings (OSTI)

Quantity of music metadata on the Web is sufficient, music recommendation and online repository systems are proof of it. However, it became a real challenge to keep quality of these metadata at reasonable level as the cost of manual validation is too ... Keywords: game with a purpose, human computing, metadata validation, multimedia, music information retrieval

Peter Dula?ka; Jakub šimko; Mária Bieliková

2012-09-01T23:59:59.000Z

375

Anton, a special-purpose machine for molecular dynamics simulation  

Science Conference Proceedings (OSTI)

The ability to perform long, accurate molecular dynamics (MD) simulations involving proteins and other biological macro-molecules could in principle provide answers to some of the most important currently outstanding questions in the fields of biology, ... Keywords: bioinformatics, biomolecular system simulation, computational biology, computational drug design, molecular dynamics, protein folding, protein structure, special-purpose machine

David E. Shaw; Martin M. Deneroff; Ron O. Dror; Jeffrey S. Kuskin; Richard H. Larson; John K. Salmon; Cliff Young; Brannon Batson; Kevin J. Bowers; Jack C. Chao; Michael P. Eastwood; Joseph Gagliardo; J. P. Grossman; C. Richard Ho; Douglas J. Ierardi; István Kolossváry; John L. Klepeis; Timothy Layman; Christine McLeavey; Mark A. Moraes; Rolf Mueller; Edward C. Priest; Yibing Shan; Jochen Spengler; Michael Theobald; Brian Towles; Stanley C. Wang

2007-06-01T23:59:59.000Z

376

Active coordination of thermal household appliances for load management purposes  

E-Print Network (OSTI)

Copyright notice: ©2009 IFAC. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works

Stephan Koch; Marek Zima; Göran Andersson

2009-01-01T23:59:59.000Z

377

OCRWM Bulletin: Westinghouse begins designing multi-purpose canister  

SciTech Connect

This publication consists of two parts: OCRWM (Office of Civilian Radioactive Waste Management) Bulletin; and Of Mountains & Science which has articles on the Yucca Mountain project. The OCRWM provides information about OCRWM activities and in this issue has articles on multi-purpose canister design, and transportation cask trailer.

1995-09-01T23:59:59.000Z

378

Results of the radiological and beryllium verification survey at the Peek Street Site, Schenectady, New York (SY001V)  

Science Conference Proceedings (OSTI)

At the request of the U.S. Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted an independent verification radiological and non-radioactive beryllium survey at the Peek Street site, located at 425 Peek Street, Schenectady, New York. The purpose of the survey, conducted during 1993 and continuing through January 1994, was to confirm the success of the remedial actions performed to remove any beryllium concentrations or radioactive materials in excess of the identified guidelines. The verification survey included surface gamma scans and gamma readings at one meter indoors and outdoors, alpha and beta scans inside the structure, and the collection of soil, dust and debris samples and smears for radionuclide and beryllium analyses. Results of the survey demonstrated that all radiological and beryllium measurements on the property were within applicable DOE guidelines. Based on all data collected, the industrial property at 425 Peek Street and the adjacent state-owned bike path in Schenectady, New York, conforms to all applicable radiological and non-radioactive beryllium guidelines established for this site by DOE and approved by the State of New York.

Foley, R.D.; Johnson, C.A.; Carrier, R.F.; Allred, J.F.

1994-10-01T23:59:59.000Z

379

Question-unanswered: Research and Development of InterVIU System to Support Chat-based Interviews  

Science Conference Proceedings (OSTI)

In the research presented in this paper, the use of computational systems for the interviews is investigated. Exploratory Case Studies had been carried through to identify the problems that occur when the technique interview is carried through by chat. ... Keywords: interview systems, InterVIU system, Chat based systems, CSCW

Ricardo Rodrigues Nunes; Mariano Pimentel

2010-10-01T23:59:59.000Z

380

Culture and international usability testing: The effects of culture in structured interviews  

E-Print Network (OSTI)

Designing global interfaces for users has always been a challenge. This challenge is even greater today with the current trend of globalization, which leads to highly diverse users of the same product. The global audiences for the software and information technology products belong to different countries, different religions, speak different languages, have different life styles, belong to different cultures and have different perceptions and expectations of the same product. A truly global product must inherently accommodate this diversity in order to be effective and successful. A major impediment is that there is very inadequate understanding of the role of culture in user interfaces and how they are built. This lack of understanding is further compounded by the fact that very little empirical work exists regarding the role of culture in usability testing. The objectives of this research are to study and empirically establish the effects of culture on the usability assessment technique of structured interviews. A study was conducted to determine the effects of culture on Indian participants when structured interviews are used in usability testing. The experiment consisted of usability testing of two independent groups of Indian participants by two interviewers; one belonging to the Indian culture and the other to the Anglo-American culture. The findings from the study clearly demonstrate the effects of culture on structured interviews during international user testing. Participants found more usability problems and made more suggestions to the interviewer from their own culture than to the interviewer from a foreign culture. The results of the study prove that culture affects the efficacy of structured interviews during international user testing.

Ravikiran Vatrapu; Ravikiran Vatrapu

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

CRUSH TESTING OF 9977 GENERAL PURPOSE FISSILE PACKAGINGS  

SciTech Connect

The 9977 General Purpose Fissile Package (GPFP) was designed in response to the adoption of the crush test requirement in the US regulations for packages for radioactive materials (10 CFR 71). This presentation on crush testing of the 9977 GPFP Reviews origins of Crush Test Requirements and implementation of crush test requirements in 10 CFR 71. SANDIA testing performed to support the rule making is reviewed. The differences in practice, on the part of the US Department of Energy from those required by the NRC for commercial purposes, are explained. The design features incorporated into the 9977 GPFP to enable it to withstand the crush test and the crush tests performed on the 9977 are described. Lessons learned from crush testing of GPFP packagings are given.

Smith, A.

2010-07-28T23:59:59.000Z

382

Differing forms, differing purposes: A typology of health impact assessment  

Science Conference Proceedings (OSTI)

There is currently considerable diversity in health impact assessment (HIA) practice internationally. Historically this diversity has been described as simple dichotomies, for example the differences between HIAs of projects and policies. However these distinctions have failed to adequately describe the differences that can be observed between different forms of HIAs. This paper describes the three historical and disciplinary fields from which HIA has emerged - environmental health, a social view of health, and health equity. It also puts forward a typology of four different forms of HIA that can be observed in current HIA practice: mandated, decision-support, advocacy, and community-led HIAs. This paper argues that these different forms of HIA serve different purposes and are not necessarily in competition; rather they allow HIA to be responsive to a range of population health concerns and purposes.

Harris-Roxas, Ben, E-mail: b.harris-roxas@unsw.edu.au; Harris, Elizabeth, E-mail: e.harris@unsw.edu.a

2011-07-15T23:59:59.000Z

383

Introduction to Measurement & Verification for DOE Super ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Introduction to M&V Introduction to M&V Introduction to Measurement & Verification for DOE Super ESPC Projects June 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's web site at http://www1.eere.energy.gov/femp/financing/superespcs_mvresources.html. Introduction to M&V Contents WHY MEASURE AND VERIFY? .................................................................................... 1 OVERVIEW OF M&V ...................................................................................................... 1

384

Application of Forecast Verification Science to Operational River Forecasting in the U.S. National Weather Service  

Science Conference Proceedings (OSTI)

Forecast verification in operational hydrology has been very limited to date, mainly due to the complexity of verifying both forcing input forecasts and hydrologic forecasts on multiple space–time scales. However, forecast verification needs to ...

Julie Demargne; Mary Mullusky; Kevin Werner; Thomas Adams; Scott Lindsey; Noreen Schwein; William Marosi; Edwin Welles

2009-06-01T23:59:59.000Z

385

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

Science Conference Proceedings (OSTI)

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

Kent Norris

2009-10-01T23:59:59.000Z

386

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

Kent Norris

2010-02-01T23:59:59.000Z

387

Observation strategies for event detection with incidence on runtime verification: theory, algorithms, experimentation  

Science Conference Proceedings (OSTI)

Many applications (such as system and user monitoring, runtime verification, diagnosis, observation-based decision making, intention recognition) all require to detect the occurrence of an event in a system, which entails the ability to observe the system. ... Keywords: 68Q17, 68U99, 68W25, Complexity, Event detection, Logic programming, Runtime verification, Temporal logic

Marco Alberti; Pierangelo Dell'Acqua; Luís Moniz Pereira

2011-07-01T23:59:59.000Z

388

Using position extrema points to capture shape in on-line handwritten signature verification  

Science Conference Proceedings (OSTI)

There is considerable interest in authentication based on handwritten signature verification (HSV) because of the long-standing tradition of its use in many common authentication tasks. HSV may be considered superior to many other biometric authentication ... Keywords: Authentication, Biometrics, Handwritten signature verification

G. K. Gupta; R. C. Joyce

2007-10-01T23:59:59.000Z

389

Java+ITP: A Verification Tool Based on Hoare Logic and Algebraic Semantics  

Science Conference Proceedings (OSTI)

Java+ITP is an experimental tool for the verification of properties of a sequential imperative subset of the Java language. It is based on an algebraic continuation passing style (CPS) semantics of this fragment as an equational theory in Maude. It supports ... Keywords: Hoare logic, Java, algebraic semantics, program verification

Ralf Sasse; José Meseguer

2007-07-01T23:59:59.000Z

390

Comments for A Conference on Verification in the 21st Century  

SciTech Connect

The author offers 5 points for the discussion of Verification and Technology: (1) Experience with the implementation of arms limitation and arms reduction agreements confirms that technology alone has never been relied upon to provide effective verification. (2) The historical practice of verification of arms control treaties between Cold War rivals may constrain the cooperative and innovative use of technology for transparency, veification and confidence building in the future. (3) An area that has been identified by many, including the US State Department and NNSA as being rich for exploration for potential uses of technology for transparency and verification is information and communications technology (ICT). This includes social media, crowd-sourcing, the internet of things, and the concept of societal verification, but there are issues. (4) On the issue of the extent to which verification technologies are keeping pace with the demands of future protocols and agrements I think the more direct question is ''are they effective in supporting the objectives of the treaty or agreement?'' In this regard it is important to acknowledge that there is a verification grand challenge at our doorstep. That is ''how does one verify limitations on nuclear warheads in national stockpiles?'' (5) Finally, while recognizing the daunting political and security challenges of such an approach, multilateral engagement and cooperation at the conceptual and technical levels provides benefits for addressing future verification challenges.

Doyle, James E. [Los Alamos National Laboratory

2012-06-12T23:59:59.000Z

391

Dosimetric Verification of IMRT Treatment Plans Using an Electronic Portal Imaging Device  

Science Conference Proceedings (OSTI)

This paper presents the procedures and results of dosimetric verification using an Electronic Portal Imaging Device as a tool for pre-treatment dosimetry in IMRT technique at the Greater Poland Cancer Centre in Poznan, Poland. The evaluation of dosimetric verification for various organ, during a 2 year period is given.

Kruszyna, Marta [Department of Physics, Adam Mickiewicz University in Poznan, Umultowska 85 St., 61-614 Poznan and Department of Medical Physics, Grater Poland Cancer Centre in Poznan, Garbary 15 St, 61-866 Poznan (Poland)

2010-01-05T23:59:59.000Z

392

Spatial clearance verification using 3D laser range scanner and augmented reality  

Science Conference Proceedings (OSTI)

A spatial clearance verification system for supporting nuclear power plant dismantling work was developed and evaluated by a subjective evaluation. The system employs a three-dimensional laser range scanner to obtain threedimensional surface models of ... Keywords: augmented reality, decommissioning, laser range scanner, nuclear power plants, spatial clearance verification

Hirotake Ishii; Shuhei Aoyama; Yoshihito Ono; Weida Yan; Hiroshi Shimoda; Masanori Izumi

2011-07-01T23:59:59.000Z

393

Verification & validation by docking: a case study of agent-based models of Anopheles gambiae  

Science Conference Proceedings (OSTI)

In this paper, using the technique of docking, we perform verification & validation (V&V) of agent-based simulation models that simulate the life cycle of Anopheles gambiae, the primary vector for malaria transmission. Working with one ... Keywords: Anopheles gambiae, docking, malaria epidemiology, verification & validation

S. M. Niaz Arifin; Gregory J. Davis; Ying Zhou

2010-07-01T23:59:59.000Z

394

An invariant-based approach to the verification of asynchronous parameterized networks  

Science Conference Proceedings (OSTI)

A uniform verification problem for parameterized systems is to determine whether a temporal property is satisfied for every instance of the system which is composed of an arbitrary number of homogeneous processes. To cope with this problem we combine ... Keywords: Asynchronous networks, Induction, Invariant generation, Model checking, Program verification, Simulation

Igor V. Konnov; Vladimir A. Zakharov

2010-11-01T23:59:59.000Z

395

Writer-independent off-line signature verification using surroundedness feature  

Science Conference Proceedings (OSTI)

The paper presents a novel set of features based on surroundedness property of a signature (image in binary form) for off-line signature verification. The proposed feature set describes the shape of a signature in terms of spatial distribution of black ... Keywords: Feature selection, Shape, Signature verification, Surroundedness, Texture

Rajesh Kumar; J. D. Sharma; Bhabatosh Chanda

2012-02-01T23:59:59.000Z

396

A CSP-based framework for the specification, verification, and implementation of adaptive systems  

Science Conference Proceedings (OSTI)

The process algebra CSP is tailored for the specification and verification of reactive systems. Such systems react upon external stimuli by adjusting their internal behavior, e.g., to recover from errors. Adaptive systems can be regarded as a subclass ... Keywords: adaptive systems, csp, modeling, verification

Björn Bartels; Moritz Kleine

2011-05-01T23:59:59.000Z

397

A novel verification technique to uncover out-of-order DUV behaviors  

Science Conference Proceedings (OSTI)

Post-partitioning verification has to deal with abstract data, implementation artifacts, and the order of events may not be preserved in the DUV due to the concurrency treatment in the golden model. Existing techniques are limited either by the use of ... Keywords: bipartite graphs, white-box verification

Gabriel Marcilio; Luiz C. V. Santos; Bruno Albertini; Sandro Rigo

2009-07-01T23:59:59.000Z

398

Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2  

SciTech Connect

DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

CARTER, R.P.

2000-04-04T23:59:59.000Z

399

Use of Social Media to Target Information-Driven Arms Control and Nonproliferation Verification  

Science Conference Proceedings (OSTI)

There has been considerable discussion within the national security community, including a recent workshop sponsored by the U.S. State Department, about the use of social media for extracting patterns of collective behavior and influencing public perception in areas relevant to arms control and nonproliferation. This paper seeks to explore if, and how, social media can be used to supplement nonproliferation and arms control inspection and monitoring activities on states and sites of greatest proliferation relevance. In this paper, we set the stage for how social media can be applied in this problem space and describe some of the foreseen challenges, including data validation, sources and attributes, verification, and security. Using information analytics and data visualization capabilities available at Pacific Northwest National Laboratory (PNNL), we provide graphical examples of some social media "signatures" of potential relevance for nonproliferation and arms control purposes. We conclude by describing a proposed case study and offering recommendations both for further research and next steps by the policy community.

Kreyling, Sean J.; Williams, Laura S.; Gastelum, Zoe N.; Whattam, Kevin M.; Corley, Courtney D.; Cramer, Nicholas O.; Rose, Stuart J.; Bell, Eric B.; Gregory, Michelle L.

2012-07-19T23:59:59.000Z

400

IAEA Verification Experiment at the Portsmouth Gaseous Diffusion Plant: Report on the Cascade Header Enrichment Monitor  

SciTech Connect

The authors describe the Cascade Header Enrichment Monitor (CHEM) for the Portsmouth Gaseous Diffusion Plant at Piketon, Ohio, and present the calibration and measurement results. The US government has offered excess fissile material that is no longer needed for defense purposes for International Atomic Energy Agency (IAEA) inspection. Measurement results provided by the CHEM were used by the IAEA in a verification experiment to provide confidence that the US successfully blended excess highly enriched uranium (HEU) down to low enriched uranium (LEU). The CHEM measured the uranium enrichment in two cascade header pipes, a 20.32-cm HEU pipe and a 7.62-cm product LEU pipe. The CHEM determines the amount of {sup 235}U from the 185.7-keV gamma-ray photopeak and the amount of total uranium by x-ray fluorescence (XRF) of the 98.4-keV x-ray from uranium with a {sup 57}Co XRF source. The ratio yields the enrichment. The CHEM consists of a collimator assembly, an electromechanically cooled germanium detector, and a rack-mounted personal computer running commercial and custom software. The CHEM was installed in December 1997 and was used by the IAEA inspectors for announced and unannounced inspections on the HEU and LEU header pipes through October 1998. The equipment was sealed with tamper-indicating enclosures when the inspectors were not present.

P. L. Kerr; D. A. Close; W. S. Johnson; R. M. Kandarian; C. E. Moss; C. D. Romero

1999-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Radiochromic film based transit dosimetry for verification of dose delivery with intensity modulated radiotherapy  

Science Conference Proceedings (OSTI)

Purpose: To evaluate the transit dose based patient specific quality assurance (QA) of intensity modulated radiation therapy (IMRT) for verification of the accuracy of dose delivered to the patient. Methods: Five IMRT plans were selected and utilized to irradiate a homogeneous plastic water phantom and an inhomogeneous anthropomorphic phantom. The transit dose distribution was measured with radiochromic film and was compared with the computed dose map on the same plane using a gamma index with a 3% dose and a 3 mm distance-to-dose agreement tolerance limit. Results: While the average gamma index for comparisons of dose distributions was less than one for 98.9% of all pixels from the transit dose with the homogeneous phantom, the passing rate was reduced to 95.0% for the transit dose with the inhomogeneous phantom. Transit doses due to a 5 mm setup error may cause up to a 50% failure rate of the gamma index. Conclusions: Transit dose based IMRT QA may be superior to the traditional QA method since the former can show whether the inhomogeneity correction algorithm from TPS is accurate. In addition, transit dose based IMRT QA can be used to verify the accuracy of the dose delivered to the patient during treatment by revealing significant increases in the failure rate of the gamma index resulting from errors in patient positioning during treatment.

Chung, Kwangzoo; Lee, Kiho; Shin, Dongho; Kyung Lim, Young; Byeong Lee, Se [Proton Therapy Center, National Cancer Center, Goyang 410-769 (Korea, Republic of); Yoon, Myonggeun; Son, Jaeman [Department of Radiological Science, College of Health Science, Korea University, Seoul 136-703 (Korea, Republic of); Yong Park, Sung [Proton Therapy Center, McLaren Cancer Institute, Flint, Michigan 48532 (United States)

2013-02-15T23:59:59.000Z

402

Regional Field Verification - Operational Results from Four Small Wind Turbines in the Pacific Northwest  

SciTech Connect

The purpose of the Department of Energy/National Renewable Energy Laboratory's (DOE/NREL) Regional Field Verification (RFV) project is to support industry needs for gaining initial field operation experience with small wind turbines and to verify the performance, reliability, maintainability, and cost of small wind turbines in diverse applications. In addition, RFV aims to help expand opportunities for wind energy in new regions of the United States by tailoring projects to meet unique regional requirements, and document and communicate the experience from these projects for the benefit of others in the wind power development community and rural utilities. Under RFV, Bergey Excel S (10kW) wind turbines were installed at sites in the Pacific Northwest as part of Northwest Sustainable Energy for Economic Development's (NWSEED) Our Wind Cooperative. Each installation was instrumented with data acquisition systems to collect a minimum of two years of operating data. The four turbines highlighted in this paper were installed between 2003 and 2004. At least two years of operational data have been collected from each of these sites by Northwest SEED. This paper describes DOE/NREL's RFV project and summarizes operational data from these sites.

Sinclair, K.; Raker, J.

2006-01-01T23:59:59.000Z

403

Nuclear Resonance Fluorescence for Material Verification in Dismantlement  

Science Conference Proceedings (OSTI)

Nuclear resonance fluorescence (NRF) is a well-established physical process that provides an isotope-specific signature that can be exploited for isotopic detection and characterization of samples. Pacific Northwest National Laboratory has been investigating possible applications of NRF for national security. Of the investigated applications, the verification of material in the dismantlement process is the most promising. Through a combination of benchmarking measurements and radiation transport modeling, we have shown that NRF techniques with existing bremsstrahlung photon sources and a modest detection system can be used to detect highly enriched uranium in the quantities and time limits relevant to the dismantlement process. Issues such as orientation, placement and material geometry do not significantly impact the sensitivity of the technique. We have also investigated how shielding of the uranium would be observed through non-NRF processes to enable the accurate assay of the material. This paper will discuss our findings on how NRF and photon-interrogation techniques may be applied to the material verification in the dismantlement process.

Warren, Glen A.; Detwiler, Rebecca S.

2011-10-01T23:59:59.000Z

404

FINAL REPORT –INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS  

Science Conference Proceedings (OSTI)

ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

ERIKA N. BAILEY

2012-02-29T23:59:59.000Z

405

INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1)  

E-Print Network (OSTI)

INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1) Site Verification of High EER Equipment Procedures for verification of High EER Equipment are described in Reference or Identification/Tag 2 System Location or Area Served 3 Certified EER Rating of the installed equipment (Btu

406

Optimum Reservoir Operation for Flood Control and Conservation Purposes  

E-Print Network (OSTI)

Rapid population and economic growth in Texas is accompanied by increased needs for water supply and flood control. Depleting groundwater reserves are resulting in an increased reliance on surface water. The rising cost of fossil fuel during the 1970's has focused attention on increasing hydroelectric power generation. Instream flow needs for fish and wildlife habitat and maintenance of fresh water inflows to bays and estuaries have received increased attention in recent years. The climate of the state is characterized by extremes of floods and droughts. Reservoirs are necessary to control and utilize the highly variable streamflow. Due to a number of economic, environmental, institutional, and political factors, construction of additional new reservoir projects is much more difficult now than in the past. Consequently, optimizing the beneficial use of existing reservoirs is becoming increasingly more important. In addition to ever increasing water related needs, other factors affecting reservoir operation change over time as well. Watershed and flood plain conditions are dynamic. Construction of numerous small flood retarding dams by the Soil Conservation Service and other entities in the watersheds of major reservoirs have reduced flood inflows to the reservoirs. Construction of numerous small ponds for recreation or watering livestock have also decreased reservoir inflows and yields. Increased runoff caused by watershed urbanization is significantly contributing to flooding problems in certain locations. The existing flood control reservoirs were planned and designed based on the expectation of ever increasing intensification of flood plain land use. However, the National Flood Insurance Program has resulted in zoning and regulation of 100-year flood plains. With stringent flood plain management, susceptibility to flooding could actually decrease over time as existing activities choose to leave the flood plain and regulation prevents other activities from moving into the flood plain. Reservoir sedimentation reduces available storage capacity. Construction of additional reservoirs, as well as other related types of projects such as conveyance facilities, flood control levees and channel improvements, and electric power plants, affect the operation of existing reservoirs. Technological advancements in hydrologic data collection, streamflow forecasting, system modeling and analysis, and computer technology provide opportunities for refining operating policies. Reservoir storage capacities and operating policies are generally established prior to construction and tend to remain constant thereafter. However, public needs and objectives and numerous factors affecting reservoir effectiveness significantly change over time. The increasing necessity to use limited storage capacity as effectively as possible warrants periodic reevaluations of operating policies. Operating procedures should be responsive to changing needs and conditions. Reallocation of storage capacity between flood control and conservation purposes represents one general strategy for modifying operating policies in response to changing needs and conditions. Reservoir operation is based upon the conflicting objectives of maximizing the amount of water available for conservation purposes and maximizing the amount of empty space available for storing flood waters. Conservation purposes include municipal, industrial, and agricultural water supply, hydroelectric power, recreation, and instream flow maintenance. Common practice is to operate a reservoir only for conservation purposes or only for flood control or to designate a certain reservoir volume, or pool, for conservation purposes and a separate pool for flood control. The conservation and flood control pools in a multiple purpose reservoir are fixed by a designated top of conservation (bottom of flood control) pool elevation. Planning, design, and operating problems associated with flood control are handled separately from those associated with conservation. Institutional arra

Wurbs, Ralph A.; Cabezas, L. Morris; Tibbets, Michael N.

1985-11-01T23:59:59.000Z

407

The Facts On Electric Vehicles: Interview with Pat Davis | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Facts On Electric Vehicles: Interview with Pat Davis The Facts On Electric Vehicles: Interview with Pat Davis The Facts On Electric Vehicles: Interview with Pat Davis December 22, 2010 - 2:25pm Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Electric vehicles have been an extremely hot topic lately and no stranger to the Energy Blog. When the first public curbside electric vehicle charging station rolled out in Washington DC, we covered it. And when Secretary Chu got a first-hand look at the Nissan Leaf during a recent visit to Japan, he covered it here on the Energy Blog. We're not the only ones talking about Electric Vehicles. From awards, to reviews, to high praise, and tough criticism - it seems everyone has an opinion. That's why we decided to sit down with our resident expert Pat

408

The Facts On Electric Vehicles: Interview with Pat Davis | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Facts On Electric Vehicles: Interview with Pat Davis The Facts On Electric Vehicles: Interview with Pat Davis The Facts On Electric Vehicles: Interview with Pat Davis December 22, 2010 - 2:25pm Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Electric vehicles have been an extremely hot topic lately and no stranger to the Energy Blog. When the first public curbside electric vehicle charging station rolled out in Washington DC, we covered it. And when Secretary Chu got a first-hand look at the Nissan Leaf during a recent visit to Japan, he covered it here on the Energy Blog. We're not the only ones talking about Electric Vehicles. From awards, to reviews, to high praise, and tough criticism - it seems everyone has an opinion. That's why we decided to sit down with our resident expert Pat

409

Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Industry At Work: Video Interview with Alta Devices' Laila Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos June 6, 2012 - 12:07pm Addthis Laila Mattos talks about her work life at Alta Devices -- a solar company based in Silicon Valley. | Video by Hantz Leger. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What is this video about? Laila Mattos, a technology manager at Alta Devices, talks about her experiences working at a "disruptive" solar company. Our Solar Industry At Work Series shares the personal success of America's solar workforce - from finance experts, to scientists, to engineers. You can learn more about the series here. "Great solar won't go anywhere unless its low cost."

410

Manufacturing in Milwaukee: An Interview with the CEO of Helios Solar Works  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manufacturing in Milwaukee: An Interview with the CEO of Helios Manufacturing in Milwaukee: An Interview with the CEO of Helios Solar Works Manufacturing in Milwaukee: An Interview with the CEO of Helios Solar Works February 8, 2013 - 12:02pm Addthis Inside the Helios Solar Works manufacturing facility. | Photo courtesy of Helios Solar Works. Inside the Helios Solar Works manufacturing facility. | Photo courtesy of Helios Solar Works. Inside the Helios Solar Works manufacturing facility. | Photo courtesy of Helios Solar Works. Inside the Helios Solar Works manufacturing facility. | Photo courtesy of Helios Solar Works. Inside the Helios Solar Works manufacturing facility. | Photo courtesy of Helios Solar Works. Inside the Helios Solar Works manufacturing facility. | Photo courtesy of Helios Solar Works. Inside the Helios Solar Works manufacturing facility. | Photo courtesy of Helios Solar Works.

411

Draft Proposal for PDG Identifiers Purpose and Use Cases  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal for PDG Identifiers Proposal for PDG Identifiers Purpose and Use Cases PDG Identif iers are strings that can be used to ref erence items in PDG such as rev iew articles, particles, datablocks or decay modes. Currently env isaged use cases include: External ref erences to items in the PDG database. For example, giv en a PDG Identif ier one can directly go to a specif ic page in pdgLiv e. Tags that can be included into the meta data of publication databases (in particular INSPIRE).

412

Development of a Consensus Standard for Verification and Validation of Nuclear System Thermal-Fluids Software  

SciTech Connect

With the resurgence of nuclear power and increased interest in advanced nuclear reactors as an option to supply abundant energy without the associated greenhouse gas emissions of the more conventional fossil fuel energy sources, there is a need to establish internationally recognized standards for the verification and validation (V&V) of software used to calculate the thermal-hydraulic behavior of advanced reactor designs for both normal operation and hypothetical accident conditions. To address this need, ASME (American Society of Mechanical Engineers) Standards and Certification has established the V&V 30 Committee, under the jurisdiction of the V&V Standards Committee, to develop a consensus standard for verification and validation of software used for design and analysis of advanced reactor systems. The initial focus of this committee will be on the V&V of system analysis and computational fluid dynamics (CFD) software for nuclear applications. To limit the scope of the effort, the committee will further limit its focus to software to be used in the licensing of High-Temperature Gas-Cooled Reactors. In this framework, the Standard should conform to Nuclear Regulatory Commission (NRC) and other regulatory practices, procedures and methods for licensing of nuclear power plants as embodied in the United States (U.S.) Code of Federal Regulations and other pertinent documents such as Regulatory Guide 1.203, 'Transient and Accident Analysis Methods' and NUREG-0800, 'NRC Standard Review Plan'. In addition, the Standard should be consistent with applicable sections of ASME NQA-1-2008 'Quality Assurance Requirements for Nuclear Facility Applications (QA)'. This paper describes the general requirements for the proposed V&V 30 Standard, which includes; (a) applicable NRC and other regulatory requirements for defining the operational and accident domain of a nuclear system that must be considered if the system is to be licensed, (b) the corresponding calculation domain of the software that should encompass the nuclear operational and accident domain to be used to study the system behavior for licensing purposes, (c) the definition of the scaled experimental data set required to provide the basis for validating the software, (d) the ensemble of experimental data sets required to populate the validation matrix for the software in question, and (e) the practices and procedures to be used when applying a validation standard. Although this initial effort will focus on software for licensing of High-Temperature Gas-Cooled Reactors, it is anticipated that the practices and procedures developed for this Standard can eventually be extended to other nuclear and non-nuclear applications.

Edwin A. Harvego; Richard R. Schultz; Ryan L. Crane

2011-12-01T23:59:59.000Z

413

REPORT OF THE WORKSHOP ON NUCLEAR FACILITY DESIGN INFORMATION EXAMINATION AND VERIFICATION FOR SAFEGUARDS  

Science Conference Proceedings (OSTI)

Executive Summary The International Atomic Energy Agency (IAEA) implements nuclear safeguards and verifies countries are compliant with their international nuclear safeguards agreements. One of the key provisions in the safeguards agreement is the requirement that the country provide nuclear facility design and operating information to the IAEA relevant to safeguarding the facility, and at a very early stage. , This provides the opportunity for the IAEA to verify the safeguards-relevant features of the facility and to periodically ensure that those features have not changed. The national authorities (State System of Accounting for and Control of Nuclear Material - SSAC) provide the design information for all facilities within a country to the IAEA. The design information is conveyed using the IAEA’s Design Information Questionnaire (DIQ) and specifies: (1) Identification of the facility’s general character, purpose, capacity, and location; (2) Description of the facility’s layout and nuclear material form, location, and flow; (3) Description of the features relating to nuclear material accounting, containment, and surveillance; and (4) Description of existing and proposed procedures for nuclear material accounting and control, with identification of nuclear material balance areas. The DIQ is updated as required by written addendum. IAEA safeguards inspectors examine and verify this information in design information examination (DIE) and design information verification (DIV) activities to confirm that the facility has been constructed or is being operated as declared by the facility operator and national authorities, and to develop a suitable safeguards approach. Under the Next Generation Safeguards Initiative (NGSI), the National Nuclear Security Administrations (NNSA) Office of Non-Proliferation and International Security identified the need for more effective and efficient verification of design information by the IAEA for improving international safeguards in the future. Consequently, the NNSA Office of International Regimes and Agreements (NA-243) sponsored a team of U.S. Department of Energy National Laboratory nuclear safeguards experts and technologists to conduct a workshop on methods and technologies for improving this activity, under the ASA-100 Advanced Safeguards Approaches Project. The workshop focused on reviewing and discussing the fundamental safeguards needs, and presented technology and/or methods that could potentially address those needs more effectively and efficiently. Conclusions and Recommendations for technology to enhance the performance of DIV inspections are presented by the workshop team.

Richard Metcalf; Robert Bean

2009-10-01T23:59:59.000Z

414

Development and Verification of Tritium Analyses Code for a Very High Temperature Reactor  

DOE Green Energy (OSTI)

A tritium permeation analyses code (TPAC) has been developed by Idaho National Laboratory for the purpose of analyzing tritium distributions in the VHTR systems including integrated hydrogen production systems. A MATLAB SIMULINK software package was used for development of the code. The TPAC is based on the mass balance equations of tritium-containing species and a various form of hydrogen (i.e., HT, H2, HTO, HTSO4, and TI) coupled with a variety of tritium source, sink, and permeation models. In the TPAC, ternary fission and neutron reactions with 6Li, 7Li 10B, 3He were taken into considerations as tritium sources. Purification and leakage models were implemented as main tritium sinks. Permeation of HT and H2 through pipes, vessels, and heat exchangers were importantly considered as main tritium transport paths. In addition, electroyzer and isotope exchange models were developed for analyzing hydrogen production systems including both high-temperature electrolysis and sulfur-iodine process. The TPAC has unlimited flexibility for the system configurations, and provides easy drag-and-drops for making models by adopting a graphical user interface. Verification of the code has been performed by comparisons with the analytical solutions and the experimental data based on the Peach Bottom reactor design. The preliminary results calculated with a former tritium analyses code, THYTAN which was developed in Japan and adopted by Japan Atomic Energy Agency were also compared with the TPAC solutions. This report contains descriptions of the basic tritium pathways, theory, simple user guide, verifications, sensitivity studies, sample cases, and code tutorials. Tritium behaviors in a very high temperature reactor/high temperature steam electrolysis system have been analyzed by the TPAC based on the reference indirect parallel configuration proposed by Oh et al. (2007). This analysis showed that only 0.4% of tritium released from the core is transferred to the product hydrogen. The amount of tritium in the product hydrogen was estimated to be approximately an order less than the gaseous effluent limit for tritium.

Chang H. Oh; Eung S. Kim

2009-09-01T23:59:59.000Z

415

Exploring the Possible Use of Information Barriers for future Biological Weapons Verification Regimes  

SciTech Connect

This report describes a path forward for implementing information barriers in a future generic biological arms-control verification regime. Information barriers have become a staple of discussion in the area of arms control verification approaches for nuclear weapons and components. Information barriers when used with a measurement system allow for the determination that an item has sensitive characteristics without releasing any of the sensitive information. Over the last 15 years the United States (with the Russian Federation) has led on the development of information barriers in the area of the verification of nuclear weapons and nuclear components. The work of the US and the Russian Federation has prompted other states (e.g., UK and Norway) to consider the merits of information barriers for possible verification regimes. In the context of a biological weapons control verification regime, the dual-use nature of the biotechnology will require protection of sensitive information while allowing for the verification of treaty commitments. A major question that has arisen is whether - in a biological weapons verification regime - the presence or absence of a weapon pathogen can be determined without revealing any information about possible sensitive or proprietary information contained in the genetic materials being declared under a verification regime. This study indicates that a verification regime could be constructed using a small number of pathogens that spans the range of known biological weapons agents. Since the number of possible pathogens is small it is possible and prudent to treat these pathogens as analogies to attributes in a nuclear verification regime. This study has determined that there may be some information that needs to be protected in a biological weapons control verification regime. To protect this information, the study concludes that the Lawrence Livermore Microbial Detection Array may be a suitable technology for the detection of the genetic information associated with the various pathogens. In addition, it has been determined that a suitable information barrier could be applied to this technology when the verification regime has been defined. Finally, the report posits a path forward for additional development of information barriers in a biological weapons verification regime. This path forward has shown that a new analysis approach coined as Information Loss Analysis might need to be pursued so that a numerical understanding of how information can be lost in specific measurement systems can be achieved.

Luke, S J

2011-12-20T23:59:59.000Z

416

Chapter 1 - Introduction and Statement of Purpose and Need  

NLE Websites -- All DOE Office Websites (Extended Search)

1-1 1-1 CHAPTER 1 INTRODUCTION AND STATEMENT OF PURPOSE AND NEED The U.S. Department of Energy (DOE) is proposing to construct and operate an Actinide Chemistry and Repository Science Laboratory (ACRSL) to support chemical research activities related to the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. The laboratory would be located on New Mexico State University property adjacent to the existing Carlsbad Environmental Monitoring and Research Center (CEMRC) in Carlsbad, New Mexico. Figure 1-1 shows the locations of the CEMRC and WIPP sites and the community of Los Alamos within the state of New Mexico. DOE has prepared this environmental assessment (EA) to assess the potential environmental impacts associated with the proposed laboratory and reasonable alternatives. The EA was prepared pursuant to the National

417

U. S, Sovernment purposes. Introduction Quadrupole Magnet Measurements  

NLE Websites -- All DOE Office Websites (Extended Search)

he submitted manuscript has been authored he submitted manuscript has been authored by a contractor of the U. S. Government under· :;ontrae! No. W-31-109-ENG-38. Accordingly, the U. S. Government retains a nonexclusive, royalty·free license to publish or reproduce the published form of this c0ntribution, or allow others to do so, for U. S, Sovernment purposes. Introduction Quadrupole Magnet Measurements S.H.Kim lS- 166 This note describes a rotating coil probe of "radial-winding geometry· for the measurements of the magnetic center, quadrupole fields and multipole coefficients of quadrupole magnets. The active length of the coil is longer than the magnet length, so that all the measurements will be integrated values along the longitudinal direction of the magnets. Errors of the

418

Guidance on purpose and need; letters between CEQ and DOT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SECRETARY OF TRANSPORTATION SECRETARY OF TRANSPORTATION WASHINGTON, D.C. 20590 May 6, 2003 The Honorable James Connaughton Chairman, Council on Environmental Quality 722 Jackson Place, NW Washington, D.C. 20503 Dear Mr. Connaughton: As Chairman of the Interagency Transportation Infrastructure Streamlining Task Force established by Executive Order 13274, I am seeking your guidance on an important issue that has significant implications for our ability to carry out the President's mandate to promote environmental stewardship and streamline environmental reviews on the Nation's transportation infrastructure projects. As you are aware, under the National Environmental Policy Act of 1969 (NEPA), the "purpose and need" for a project is a critical element in the environmental review process. It explains the

419

The White House Office of Media Affairs For Planning Purposes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Media Affairs For Planning Purposes December 14, 2010 Environmental Leaders, Cabinet Secretaries to Participate in First White House Environmental Justice Forum WASHINGTON, D.C. - On December 15, Obama Administration officials will convene the first-ever White House Forum on Environmental Justice. Environmental leaders from across the country will attend the day-long forum featuring White House Council on Environmental Quality Chair Nancy Sutley, EPA Administrator Lisa P. Jackson, Attorney General Eric Holder, Secretary of the Interior Ken Salazar, Secretary of Labor Hilda Solis, Secretary of Health and Human Services Kathleen Sebelius, Secretary of Energy Steven Chu, and Secretary of Homeland Security Janet Napolitano. This Forum will focus on the Obama Administration's commitment to ensuring that

420

Nuclear dual-purpose plants for industrial energy  

SciTech Connect

One of the major obstacles to extensive application of nuclear power to industrial heat is the difference between the relatively small energy requirements of individual industrial plants and the large thermal capacity of current power reactors. A practical way of overcoming this obstacle would be to operate a centrally located dual-purpose power plant that would furnish process steam to a cluster of industrial plants, in addition to generating electrical power. The present study indicates that even relatively remote industrial plants could be served by the power plant, since it might be possible to convey steam economically as much as ten miles or more. A survey of five major industries indicates a major potential market for industrial steam from large nuclear power stations.

Klepper, O.H.

1976-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Multi-purpose canister system evaluation: A systems engineering approach  

SciTech Connect

This report summarizes Department of Energy (DOE) efforts to investigate various container systems for handling, transporting, storing, and disposing of spent nuclear fuel (SNF) assemblies in the Civilian Radioactive Waste Management System (CRWMS). The primary goal of DOE`s investigations was to select a container technology that could handle the vast majority of commercial SNF at a reasonable cost, while ensuring the safety of the public and protecting the environment. Several alternative cask and canister concepts were evaluated for SNF assembly packaging to determine the most suitable concept. Of these alternatives, the multi-purpose canister (MPC) system was determined to be the most suitable. Based on the results of these evaluations, the decision was made to proceed with design and certification of the MPC system. A decision to fabricate and deploy MPCs will be made after further studies and preparation of an environmental impact statement.

1994-09-01T23:59:59.000Z

422

Codes and Standards Tech Team (CSTT) Purpose & Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

FreedomCAR and Fuel Partnership FreedomCAR and Fuel Partnership Codes and Standards Tech Team (CSTT) Overview & Introduction CSTT Purpose & Operation C&S Roadmap & Fuel Purity Brad Smith, Shell Hydrogen - CSTT co-lead April 26, 2004 Members FreedomCAR and Fuel Partnership ChevronTexaco EXONMobil ConocoPhillips w/ National Labs Organization Executive Steering Group OEM & Energy R&D VPs DOE-EE Asst Sec Fuel Cell & Vehicle Tech Teams OEM Tech Experts DOE Tech Experts Fuel Operations Group Energy Directors DOE Program Managers Fuel Tech Teams Energy Tech Experts DOE Tech Experts FreedomCAR Operations Group OEM Directors DOE Program Managers Hydrogen Storage Tech Team OEM & Energy & DOE Tech Experts Codes & Standards Tech Team OEM & Energy & DOE

423

More than suggestion: The effect of interviewing techniques from the McMartin Preschool case  

E-Print Network (OSTI)

Child interviewing techniques derived from transcripts of the McMartin Preschool case were found to be substantially more effective than simple suggestive questions at inducing preschool children to make false allegations against a classroom visitor. Thirty-six children interviewed with McMartin techniques made 58 % accusations, compared with 17% for 30 children interviewed with suggestive questions. Social influence and reinforcement appeared to be more powerful determinants of children's answers than simple suggestive questions. The SIRR model is proposed to explain how false statements may be elicited from children or adults. Categories identified in the SIRR model are suggestive questions, social influence, reinforcement, and removal from direct experience. During the 1980s a series of highly publicized "daycare ritual abuse cases " erupted in communities across the United States and Europe (Kelley, 1996; Nathan & Snedeker, 1995). The cases typically involved allegations by preschool children that they had been terrorized and sexually abused by day-care workers in bizarre scenarios with Satanic or ritualistic overtones. Some scholars continue to take the view that these cases were genuine and involved actual ritual abuse (Faller, 1996; Summit, 1994). However, skepticism has become widespread among research psychologists (Bottoms & Davis, 1997; Bottoms, Shaver, & Goodman, 1996; Ceci & Bruck, 1995). An extensive body of research, arising in the wake of the day-care cases of the 1980s, has identified a variety of interviewing techniques that can induce children to make

Sena Garven; James M. Wood; Roy S. Malpass; John S. Shaw

1998-01-01T23:59:59.000Z

424

Chapter 5 Lord Howe Island interview results 5.1 Introduction  

E-Print Network (OSTI)

established and alternative energy options. I present their views on the system of diesel fired electricity production, solar hot water systems, gas and vehicle usage. I then present their views on alternative energy, nuclear energy, improving energy efficiency and electric vehicles. During interviews, I questioned

425

Measurement and Verification (M&V) Planning Tool  

NLE Websites -- All DOE Office Websites (Extended Search)

2.7a 2.7a M&V Planning Tool Instructions M&V Planning Tool June 17, 2003 Members of the M&V Planning Working Group 1. Satish Kumar, Lawrence Berkeley National Laboratory 2. Venkat Kumar, Johnson Controls 3. Terry Sharp, Oak Ridge National Laboratory 4. Gopal Shiddapur, NORESCO (Formerly with Duke Energy Solutions) 5. Mark Stetz, Nexant, Inc. 6. Lia Webster, Nexant, Inc. Goals 1. To provide a framework that would help in the development of the measurement & verification (M&V) plans by introducing M&V specific issues at an early project development stage. 2. Keep the framework as simple as possible to increase its usability. 3. Provide users of the FEMP M&V Guidelines, version 2.2, a simple, flexible, and customizable

426

Guidelines on Airflow and Refrigerant Charge Verification and Diagnostics  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GUIDELINES ON AIRFLOW AND GUIDELINES ON AIRFLOW AND REFRIGERANT CHARGE VERIFICATION AND DIAGNOSTICS Alliance for Residential Building Innovation David Springer, Davis Energy Group Context  Airflow and refrigerant charge defects in existing air conditioning systems are well documented  Failure to address these problems represents a missed opportunity for home performance contractors  To ensure cost-effective solutions, a systematic approach is needed to quickly and accurately diagnose and resolve problems  Target:  Home performance contractors  HVAC contractors & technicians The Impact of Defects Non-TXV TXV 15% duct leakage 1 -18.10% 23% low airflow -4.70% 50% condenser coil blockage -5.80% 50% evaporator coil blockage 2 -4.60% -4.20% 20% overcharge -3.50% -7.90%

427

Example Measurement & Verification Plan for a Super ESPC Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6.1 6.1 Example M&V Plan Example Measurement & Verification Plan for a Super ESPC Project February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's web site at www.eere.energy.gov/femp/financing/superespcs_mvresources.cfm. Comments should be sent to lwebster@nexant.com. 6.1 Example M&V Plan Contents 1. EXECUTIVE SUMMARY / M&V OVERVIEW AND PROPOSED SAVINGS CALCULATIONS ................................................................................................... 2 1.1

428

Measurement and Verification (M&V) Planning Tool  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2.7a 2.7a M&V Planning Tool Instructions M&V Planning Tool June 17, 2003 Members of the M&V Planning Working Group 1. Satish Kumar, Lawrence Berkeley National Laboratory 2. Venkat Kumar, Johnson Controls 3. Terry Sharp, Oak Ridge National Laboratory 4. Gopal Shiddapur, NORESCO (Formerly with Duke Energy Solutions) 5. Mark Stetz, Nexant, Inc. 6. Lia Webster, Nexant, Inc. Goals 1. To provide a framework that would help in the development of the measurement & verification (M&V) plans by introducing M&V specific issues at an early project development stage. 2. Keep the framework as simple as possible to increase its usability. 3. Provide users of the FEMP M&V Guidelines, version 2.2, a simple, flexible, and customizable

429

Specification and Verification of Dynamics in Cognitive Agent Models  

E-Print Network (OSTI)

Within many domains, among which biological and cognitive areas, multiple interacting processes occur among agents with dynamics that are hard to handle. Current approaches to analyse the dynamics of such processes, often based on differential equations, are not always successful. As an alternative to differential equations, this paper presents the predicate logical Temporal Trace Language (TTL) for the formal specification and analysis of dynamic properties. This language supports the specification of both qualitative and quantitative aspects, and therefore subsumes specification languages based on differential equations. A software environment has been developed for TTL, that supports editing TTL properties and enables the formal verification of properties against a set of traces. The TTL environment proved its value in a number of projects within different domains. 1.

Tibor Bosse; Catholijn M. Jonker; Lourens Van Der Meij; Alexei Sharpanskykh; Jan Treur

2006-01-01T23:59:59.000Z

430

2005 JASON Summer Study Verification and Validation Charge Program Summary  

National Nuclear Security Administration (NNSA)

05 JASON Summer Study 05 JASON Summer Study Verification and Validation Charge Program Summary The Advanced Simulation and Computing (ASC) Program has been driven since its inception by the need to ensure the safety, reliability and performance of the nuclear weapons stockpile without nuclear testing through the development of simulation and modeling capability and the deployment of that capability on state-of-the-art high performance computing platforms. As the devices in the stockpile age and as necessary changes are made with technologies or materials that are new to the stockpile, simulation can give laboratory experts, policy makers and DoD customers increased confidence that the nuclear weapons in the stockpile will perform as expected. The stockpile stewardship program's increasing

431

The new geospatial tools: global transparency enhancing safeguards verification  

Science Conference Proceedings (OSTI)

This paper focuses on the importance and potential role of the new, freely available, geospatial tools for enhancing IAEA safeguards and how, together with commercial satellite imagery, they can be used to promote 'all-source synergy'. As additional 'open sources', these new geospatial tools have heralded a new era of 'global transparency' and they can be used to substantially augment existing information-driven safeguards gathering techniques, procedures, and analyses in the remote detection of undeclared facilities, as well as support ongoing monitoring and verification of various treaty (e.g., NPT, FMCT) relevant activities and programs. As an illustration of how these new geospatial tools may be applied, an original exemplar case study provides how it is possible to derive value-added follow-up information on some recent public media reporting of a former clandestine underground plutonium production complex (now being converted to a 'Tourist Attraction' given the site's abandonment by China in the early 1980s). That open source media reporting, when combined with subsequent commentary found in various Internet-based Blogs and Wikis, led to independent verification of the reporting with additional ground truth via 'crowdsourcing' (tourist photos as found on 'social networking' venues like Google Earth's Panoramio layer and Twitter). Confirmation of the precise geospatial location of the site (along with a more complete facility characterization incorporating 3-D Modeling and visualization) was only made possible following the acquisition of higher resolution commercial satellite imagery that could be correlated with the reporting, ground photos, and an interior diagram, through original imagery analysis of the overhead imagery.

Pabian, Frank Vincent [Los Alamos National Laboratory

2010-09-16T23:59:59.000Z

432

Independent Verification Final Summary Report for the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee  

SciTech Connect

The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified “hot spot” cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: 1) performing radiological walkover surveys, and 2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site was removed in its entirety.

P.C. Weaver

2009-04-29T23:59:59.000Z

433

Verification methodology for the DOE-1 building energy analysis computer program  

SciTech Connect

The ''verification'' for the real-system simulations of DOE-1 (formerly Cal-ERDA) will center on the task of determining the range of applicability (limitations) of the model and the desired accuracy within this range. Phase I is primarily an analytical verification test that includes a series of tests and crosschecks for exercising the DOE-1 program as a computational unit rather than as separate algorithms. Phase II is a field verification test designed to examine the DOE-1 program on an individual algorithm basis. Tasks in the project are listed. (MHR)

Diamond, S.C.; Hunn, B.D.; McDonald, T.E.

1978-01-01T23:59:59.000Z

434

INDEPENDENT VERIFICATION OF THE BUILDING 3550 SLAB AT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE  

Science Conference Proceedings (OSTI)

The Oak Ridge Institute for Science and Education (ORISE) has completed the independent verification survey of the Building 3550 Slab. The results of this effort are provided. The objective of this verification survey is to provide independent review and field assessment of remediation actions conducted by Safety and Ecology Corporation (SEC) to document that the final radiological condition of the slab meets the release guidelines. Verification survey activities on the Building 3550 Slab that included scans, measurements, and the collection of smears. Scans for alpha, alpha plus beta, and gamma activity identified several areas that were investigated.

Weaver, Phyllis C.

2012-05-08T23:59:59.000Z

435

Letter Report - Verification Survey of Final Grids at the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee  

Science Conference Proceedings (OSTI)

Conduct verification surveys of grids at the DWI 1630 Site in Knoxville, Tennessee. The independent verification team (IVT) from ORISE, conducted verification activities in whole and partial grids, as completed by BJC. ORISE site activities included gamma surface scans and soil sampling within 33 grids; G11 through G14; H11 through H15; X14, X15, X19, and X21; J13 through J15 and J17 through J21; K7 through K9 and K13 through K15; L13 through L15; and M14 through M16

P.C. Weaver

2009-02-17T23:59:59.000Z

436

Visualization of Instrumental Verification Information Details (VIVID) : code development, description, and usage.  

SciTech Connect

The formulation, implementation and usage of a numerical solution verification code is described. This code uses the Richardson extrapolation procedure to estimate the order of accuracy and error of a computational program solution. It evaluates multiple solutions performed in numerical grid convergence studies to verify a numerical algorithm implementation. Analyses are performed on both structured and unstructured grid codes. Finite volume and finite element discretization programs are examined. Two and three-dimensional solutions are evaluated. Steady state and transient solution analysis capabilities are present in the verification code. Multiple input data bases are accepted. Benchmark options are included to allow for minimal solution validation capability as well as verification.

Roy, Christopher John; Bainbridge, Bruce L.; Potter, Donald L.; Blottner, Frederick G.; Black, Amalia Rebecca

2005-03-01T23:59:59.000Z

437

General-purpose event generators for LHC physics  

SciTech Connect

We review the physics basis, main features and use of general-purpose Monte Carlo event generators for the simulation of proton-proton collisions at the Large Hadron Collider. Topics included are: the generation of hard-scattering matrix elements for processes of interest, at both leading and next-to-leading QCD perturbative order; their matching to approximate treatments of higher orders based on the showering approximation; the parton and dipole shower formulations; parton distribution functions for event generators; non-perturbative aspects such as soft QCD collisions, the underlying event and diffractive processes; the string and cluster models for hadron formation; the treatment of hadron and tau decays; the inclusion of QED radiation and beyond-Standard-Model processes. We describe the principal features of the Ariadne, Herwig++, Pythia 8 and Sherpa generators, together with the Rivet and Professor validation and tuning tools, and discuss the physics philosophy behind the proper use of these generators and tools. This review is aimed at phenomenologists wishing to understand better how parton-level predictions are translated into hadron-level events as well as experimentalists wanting a deeper insight into the tools available for signal and background simulation at the LHC.

Buckley, Andy; /Edinburgh U.; Butterworth, Jonathan; /University Coll. London; Gieseke, Stefan; /Karlsruhe U., ITP; Grellscheid, David; /Durham U., IPPP; Hoche, Stefan; /SLAC; Hoeth, Hendrik; Krauss, Frank; /Durham U., IPPP; Lonnblad, Leif; /Lund U., Dept. Theor. Phys. /CERN; Nurse, Emily; /University Coll. London; Richardson, Peter; /Durham U., IPPP; Schumann, Steffen; /Heidelberg U.; Seymour, Michael H.; /Manchester U.; Sjostrand, Torbjorn; /Lund U., Dept. Theor. Phys.; Skands, Peter; /CERN; Webber, Bryan; /Cambridge U.

2011-03-03T23:59:59.000Z

438

Nondestructive inspection of General Purpose Heat Source (GPHS) girth welds  

SciTech Connect

The General-Purpose Heat Source (GPHS) provides power for space missions by transmitting the heat of {sup 238}Pu decay to an array of thermoelectric elements. The GPHS is fabricated using iridium capsules, TIG welded, to contain the {sup 238}PuO{sub 2} fuel pellet. GPHS capsules will be utilized in the upcoming Cassini mission to explore Saturn and its moons. The physical integrity of the girth weld is important to mission safety and performance. Since experience in the past had revealed a potential for initiation of small cracks in the girth weld overlap zone, a nondestructive inspection of the capsule weld is required. A ultrasonic method was used to inspect the welds of capsules fabricated for the Galileo mission. The instrument, transducer, and method used were state of the art at the time (early 1980s). The ultrasonic instrumentation and methods used to inspect the Cassini GPHSs was significantly upgraded from those used for the Galileo mission. GPHSs that had ultrasonic reflectors that exceeded the reject specification level were subsequently inspected with radiography to provide additional engineering data used to accept/reject the heat source. This paper describes the Galileo-era ultrasonic instrumentation and methods and the subsequent upgrades made to support testing of Cassini GPHSs. Also discussed is the data obtained from radiographic examination and correlation to ultrasonic examination results.

Reimus, M.A.H.; George, T.G.; Lynch, C. [and others

1998-12-31T23:59:59.000Z

439

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FAQ for: ENERGY STAR Verification Testing Pilot Program December 2010 Table of Contents Introduction............................................................................................................................... 1 What product types will be tested? ................................................................................................. 1 Will testing continue after the State Energy Efficient Appliance Rebate Program (SEEARP) ends? .................................................................................................................................................... 1 For Consumers .......................................................................................................................... 1

440

vlogsl: a strategy language for simulation-based verification of hardware  

Science Conference Proceedings (OSTI)

Languages such as SystemVerilog and e play an important role in contemporary hardware verification methodology. Through direct, language-level support for notions like constrained randoms, functional coverage, assertions, and so forth, they help ...

Michael Katelman; José Meseguer

2010-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Tutorial T4B: Formal Assertion-Based Verification in Industrial Setting  

Science Conference Proceedings (OSTI)

Increased complexities of hardware designs have made exhaustive simulation of designs near impossible - thereby creating a need for some complementary verification technique. This has generated a renewed interest in use of Formal Analysis on industrial ...

Praveen Tiwari; Raj Mitra; Manu Chopra; Alok Jain

2007-01-01T23:59:59.000Z

442

New Developments of the Intensity-Scale Technique within the Spatial Verification Methods Intercomparison Project  

Science Conference Proceedings (OSTI)

The intensity-scale verification technique introduced in 2004 by Casati, Ross, and Stephenson is revisited and improved. Recalibration is no longer performed, and the intensity-scale skill score for biased forecasts is evaluated. Energy and its ...

B. Casati

2010-02-01T23:59:59.000Z

443

V-098: Linux Kernel Extended Verification Module Bug Lets Local Users Deny  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Linux Kernel Extended Verification Module Bug Lets Local 8: Linux Kernel Extended Verification Module Bug Lets Local Users Deny Service V-098: Linux Kernel Extended Verification Module Bug Lets Local Users Deny Service February 25, 2013 - 12:12am Addthis PROBLEM: Linux Kernel Extended Verification Module Bug Lets Local Users Deny Service PLATFORM: The Linux Kernel prior to 3.7.5 ABSTRACT: A vulnerability was reported in the Linux Kernel. REFERENCE LINKS: The Linux Kernel Archives Linux Kernel Red Hat Bugzilla - Bug 913266 SecurityTracker Alert ID: 1028196 CVE-2013-0313 IMPACT ASSESSMENT: Medium DISCUSSION: A local user can exploit a null pointer dereference in the evm_update_evmxattr() function in 'security/integrity/evm/evm_crypto.c' to cause the target system to crash. IMPACT: A local user can cause denial of service conditions.

444

Comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

⋅ WASHINGTON, DC ⋅ LOS ANGELES ⋅ BEIJING ⋅ CHICAGO ⋅ WASHINGTON, DC ⋅ LOS ANGELES ⋅ BEIJING ⋅ CHICAGO San Francisco, CA 94104 TEL 415 875-6100 FAX 415 875-6161 www.nrdc.org NRDC Comments on DOE's April 22, 2011 Verification Testing in Support of Energy Star Proposal Submitted by: Noah Horowitz Senior Scientist Natural Resources Defense Council (NRDC) May 9, 2011 On behalf of the Natural Resources Defense Council (NRDC) and it's more than 1.3 million members and e-activists, we respectfully submit comments on DOE's Verification Testing in Support of ENERGY STAR proposal. Verification testing programs are critical to ensure that products are performing as promised and consumers are receiving the energy and utility savings claimed by the manufacturer. With one exception, NRDC strongly supports DOE's proposal for conducting verification

445

Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on DOE's Verification Testing in Support of ENERGY STAR® Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft Process Document Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft Process Document On April 22, 2011, The U.S. Department of Energy (DOE) released a draft of DOE's Verification Testing in Support of ENERGY STAR Process Plan for 2011. DOE accepted comments through May 9, 2011 and they are displayed below. Company/Organization Consumers Union Association of Home Appliance Manufacturers (AHAM) Air Conditioning, Heating and Refrigeration Institute (AHRI) A. O. Smith Corporation Alliance for Water Efficiency (AWE) Bradford White Corporation (BWC) BSH Home Appliances Corporation CertainTeed Corporation Traulsen InterMetro Industries Corp. Hoshizaki America, Inc. Earthjustice

446

Toward improved tropical cyclone intensity forecasts : probabilistic prediction, predictability, and the role of verification  

E-Print Network (OSTI)

Over the past two decades, deterministic predictions of tropical cyclone (TC) intensity consistently scored poorly in mean absolute error (MAE) verification, despite the concurrent advancement of TC modeling and observing ...

Moskaitis, Jonathan Robert

2009-01-01T23:59:59.000Z

447

Application of Object-Based Verification Techniques to Ensemble Precipitation Forecasts  

Science Conference Proceedings (OSTI)

Both the Method for Object-based Diagnostic Evaluation (MODE) and contiguous rain area (CRA) object-based verification techniques have been used to analyze precipitation forecasts from two sets of ensembles to determine if spread-skill behavior ...

William A. Gallus Jr.

2010-02-01T23:59:59.000Z

448

A Coherent Method of Stratification within a General Framework for Forecast Verification  

Science Conference Proceedings (OSTI)

The general framework for forecast verification described by Murphy and Winkler embodies a statistical approach to the problem of assessing the quality of forecasts. This framework is based on the joint distribution of forecasts and observations, ...

Allan H. Murphy

1995-05-01T23:59:59.000Z

449

Regional Field Verification -- Operational Results from Four Small Wind Turbines in the Pacific Northwest: Preprint  

SciTech Connect

This paper describes four small wind turbines installed in the Pacific Northwest under DOE/NREL's Regional Field Verification Program between 2003 and 2004 and summarizes operational data from each site.

Sinclair, K.; Raker, J.

2006-08-01T23:59:59.000Z

450

Controllable needle-free injection : development and verification of a novel device  

E-Print Network (OSTI)

Current needle-free injection technology is based on actuation via compressed springs or gas. These devices are not easy to modify for different depths of injections. This thesis describes the design and verification of a ...

Wendell, Dawn M. (Dawn Marie), 1983-

2006-01-01T23:59:59.000Z

451

Robust audio-visual person verification using Web-camera video  

E-Print Network (OSTI)

This thesis examines the challenge of robust audio-visual person verification using data recorded in multiple environments with various lighting conditions, irregular visual backgrounds, and diverse background noise. ...

Schultz, Daniel (Daniel T.)

2006-01-01T23:59:59.000Z

452

Verification of Nowcasts from the WWRP Sydney 2000 Forecast Demonstration Project  

Science Conference Proceedings (OSTI)

The verification phase of the World Weather Research Programme (WWRP) Sydney 2000 Forecast Demonstration Project (FDP) was intended to measure the skill of the participating nowcast algorithms in predicting the location of convection, rainfall ...

Elizabeth E. Ebert; Laurence J. Wilson; Barbara G. Brown; Pertti Nurmi; Harold E. Brooks; John Bally; Matthias Jaeneke

2004-02-01T23:59:59.000Z

453

The Finley Affair: A Signal Event in the History of Forecast Verification  

Science Conference Proceedings (OSTI)

In 1884 a paper by J.P. Finley appeared in the American Meteorological Journal describing the results of an experimental tornado forecasting program in the central and eastern United States. Finley's paper reported “percentages of verifications” ...

Allan H. Murphy

1996-03-01T23:59:59.000Z

454

On Using First-Order Theorem Provers in the Jahob Data Structure Verification System  

E-Print Network (OSTI)

This paper presents our integration of efficient resolution-based theorem provers into the Jahob data structure verification system. Our experimental results show that this approach enables Jahob to automatically ...

Bouillaguet, Charles

2006-11-09T23:59:59.000Z

455

Class 1E software verification and validation: Past, present, and future  

Science Conference Proceedings (OSTI)

This paper discusses work in progress that addresses software verification and validation (V&V) as it takes place during the full software life cycle of safety-critical software. The paper begins with a brief overview of the task description and discussion of the historical evolution of software V&V. A new perspective is presented which shows the entire verification and validation process from the viewpoints of a software developer, product assurance engineer, independent V&V auditor, and government regulator. An account of the experience of the field test of the Verification Audit Plan and Report generated from the V&V Guidelines is presented along with sample checklists and lessons learned from the verification audit experience. Then, an approach to automating the V&V Guidelines is introduced. The paper concludes with a glossary and bibliography.

Persons, W.L.; Lawrence, J.D.

1993-10-01T23:59:59.000Z

456

Diagnostic Verification of the Climate Prediction Center Long-Lead Outlooks, 1995–98  

Science Conference Proceedings (OSTI)

The performance of the Climate Prediction Center’s long-lead forecasts for the period 1995–98 is assessed through a diagnostic verification, which involves examination of the full joint frequency distributions of the forecasts and the ...

D. S. Wilks

2000-07-01T23:59:59.000Z

457

Trends in Severe Local Storm Watch Verification at the National Severe Storms Forecast Center  

Science Conference Proceedings (OSTI)

Trends of tornado and severe thunderstorm watch verification for the period 1967–1990 are presented. Over the past 10 years the annual number of reported severe thunderstorm events has increased substantially. In comparison, the number of tornado ...

Richard W. Anthony; Preston W. Leftwich Jr.

1992-12-01T23:59:59.000Z

458

Application of the Composite Method to the Spatial Forecast Verification Methods Intercomparison Dataset  

Science Conference Proceedings (OSTI)

The composite method is applied to verify a series of idealized and real precipitation forecasts as part of the Spatial Forecast Verification Methods Intercomparison Project. The test cases range from simple geometric shapes to high-resolution (...

Jason E. Nachamkin

2009-10-01T23:59:59.000Z

459

Ergodic HMM-UBM system for on-line signature verification  

Science Conference Proceedings (OSTI)

We propose a novel approach for on-line signature verification based on building HMM user models by adapting an ergodic Universal Background Model (UBM). State initialization of this UBM is driven by a dynamic signature feature. This approach inherits ...

Enrique Argones Rúa; David Pérez-Piñar López; José Luis Alba Castro

2009-09-01T23:59:59.000Z

460

Verification of RUC 0–1-h Forecasts and SPC Mesoscale Analyses Using VORTEX2 Soundings  

Science Conference Proceedings (OSTI)

This study uses radiosonde observations obtained during the second phase of the Verification of the Origins of Rotation in Tornadoes Experiment (VORTEX2) to verify base-state variables and severe-weather-related parameters calculated from Rapid ...

Michael C. Coniglio

2012-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The Benefits and Challenges of Predictive Interval Forecasts and Verification Graphics for End Users  

Science Conference Proceedings (OSTI)

Two behavioral experiments tested the use of predictive interval forecasts and verification graphics by nonexpert end users. Most participants were able to use a simple key to understand a predictive interval graphic, showing a bracket to indicate ...

Susan Joslyn; Lou Nemec; Sonia Savelli

2013-04-01T23:59:59.000Z

462

Intercomparison of Spatial Forecast Verification Methods: Identifying Skillful Spatial Scales Using the Fractions Skill Score  

Science Conference Proceedings (OSTI)

The fractions skill score (FSS) was one of the measures that formed part of the Intercomparison of Spatial Forecast Verification Methods project. The FSS was used to assess a common dataset that consisted of real and perturbed Weather Research ...

Marion Mittermaier; Nigel Roberts

2010-02-01T23:59:59.000Z

463

Spatial Forecast Verification: Baddeley’s Delta Metric Applied to the ICP Test Cases  

Science Conference Proceedings (OSTI)

A mathematical displacement metric, Baddeley’s ?, is examined for verifying gridded forecasts against gridded observations using the Spatial Forecast Verification Methods Intercomparison Project test cases. Results are compared with several other ...

Eric Gilleland

2011-06-01T23:59:59.000Z

464

Imagery Randomized Block Analysis (IRBA) Applied to the Verification of Cloud Edge Detectors  

Science Conference Proceedings (OSTI)

A recently developed statistical method is described for evaluating the effectiveness of numerical models. This method is applied to the verification of the effectiveness of satellite imagery cloud edge detectors. Digital satellite data are ...

Frank P. Kelly; Thomas H. Vonder Haar; Paul W. Mielke Jr.

1989-08-01T23:59:59.000Z

465

Errors for Space-Based Doppler Lidar Wind Measurements: Definition, Performance, and Verification  

Science Conference Proceedings (OSTI)

Verification of space-based wind measurements will be difficult because of the random variations of the atmospheric velocity field over the measurement volume. The definition of accuracy requires a definition of “truth.” For this work, truth is ...

Rod Frehlich

2001-11-01T23:59:59.000Z

466

Automated Formal Verification of the DHCP Failover Protocol Using Timeout Order Abstraction  

E-Print Network (OSTI)

In this paper, we present automated formal verification of the DHCP Failover protocol. We conduct bounded model-checking for the protocol using Timeout Order Abstraction (TO-Abstraction), a technique to abstract a given ...

Umeno, Shinya

467

Comparative Verification of Guidance and Local Quantitative Precipitation Forecasts: Calibration Analyses  

Science Conference Proceedings (OSTI)

A comparative verification is reported of 2631 matched pairs of quantitative precipitation forecasts (QPFs) prepared daily from 1 October 1992 to 31 October 1996 by the Hydrometeorological Prediction Center (HPC) and the Weather Service Forecast ...

Roman Krzysztofowicz; Ashley A. Sigrest

1999-06-01T23:59:59.000Z

468

Independent Verification Survey Report for the Operable Unit-1 Miamisburg Closure Project, Miamisburg, OH  

SciTech Connect

The objectives of the independent verification survey were to confirm that remedial actions have been effective in meeting established release criteria and that documentation accurately and adequately describes the current radiological and chemical conditions of the MCP site.

Weaver, P.

2008-03-17T23:59:59.000Z

469

A unified processor model for compiler verification and simulation using ASM  

Science Conference Proceedings (OSTI)

For safety critical embedded systems the correctness of the processor, toolchain and compiler is an important issue. Translation validation is one approach for compiler verification. A common semantic framework to represent source and target language ...

Roland Lezuo; Andreas Krall

2012-06-01T23:59:59.000Z

470

Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications  

Science Conference Proceedings (OSTI)

This report documents the verification and validation (VV) of five selected fire models commonly used in support of risk-informed and performance-based (RI/PB) fire protection at nuclear power plants (NPPs).

2007-05-30T23:59:59.000Z

471

Simulated Verification of Fuel Element Inventory in a Small Reactor Core Using the Nuclear Materials Identification System (NMIS)  

SciTech Connect

The International Panel on Climate Change projects that by 2050 the world energy demand may double. Although the primary focus for new nuclear power plants in industrialized nations is on large plants in the 1000-1600 MWe range, there is an increasing demand for small and medium reactors (SMRs). About half of the innovative SMR concepts are for small (<300 MWe) reactors with a 5-30 year life without on-site refueling. This type of reactor is also known as a battery-type reactor. These reactors are particularly attractive to countries with small power grids and for non-electrical purposes such as heating, hydrogen production, and seawater desalination. Traditionally, this type of reactor has been used in a nautical propulsion role. This type of reactor is designed as a permanently sealed unit to prevent the diversion of the uranium in the core by the user. However, after initial fabrication it will be necessary to verify that the newly fabricated reactor core contains the quantity of uranium that initially entered the fuel fabrication plant. In most instances, traditional inspection techniques can be used to perform this verification, but in certain situations the core design will be considered sensitive. Non-intrusive verification techniques must be utilized in these situations. The Nuclear Materials Identification System (NMIS) with imaging uses active interrogation and a fast time correlation processor to characterize fissile material. The MCNP-PoliMi computer code was used to simulate NMIS measurements of a small, sealed reactor core. Because most battery-type reactor designs are still in the early design phase, a more traditional design based on a Russian icebreaker core was used in the simulations. These simulations show how the radiography capabilities of the NMIS could be used to detect the diversion of fissile material by detecting void areas in the assembled core where fuel elements have been removed.

Grogan, Brandon R [ORNL; Mihalczo, John T [ORNL

2009-01-01T23:59:59.000Z

472

Microsoft Word - S05773_2009 VerifMonRpt.doc  

Office of Legacy Management (LM)

September 2009 September 2009 LMS/DUP/S05773 This page intentionally left blank LMS/DUP/S05773 Office of Legacy Management Verification Monitoring Report for the Durango, Colorado, Processing Site September 2009 This page intentionally left blank U.S. Department of Energy Verification Monitoring Report-Durango, Colorado, Processing Site September 2009 Doc. No. S05773 Page i Contents Abbreviations................................................................................................................................. iii 1.0 Introduction............................................................................................................................ 1 2.0 Site Conditions.......................................................................................................................

473

Use of MCC-Based Motor Torque Measurements for Periodic Verification of Motor-Operated Valves  

Science Conference Proceedings (OSTI)

This report develops, justifies, and validates a motor control center- (MCC-) based motor torque periodic verification (MTPV) method for torque-switch-controlled closing strokes of rising stem motor-operated valves (MOVs) with ac motors. The report details the evaluation of motor torque data obtained from electrical measurements at the MCC and covers the use of these (and other) measurements in MOV periodic verification (PV) testing.

2006-03-30T23:59:59.000Z

474

Proceedings: Demand Response Evaluation, Measurement, and Verification Workshop Highlights and Presentations  

Science Conference Proceedings (OSTI)

This Tech Update provides highlights and presentations from the EPRI Demand Response Evaluation, Measurement and Verification (DR EM&V) Workshop, held November 13 14, 2008, in Dallas, Texas. Attended by 30 participants representing utilities, independent system operators, EPRI, and a curtailment service provider, the day-and-a-half meeting provided a forum for review of DR measurement and verification (M&V) standards development, business practices, and lessons learned.

2008-12-22T23:59:59.000Z

475

T.: Web application development and quality - observations from interviews with companies in norway  

E-Print Network (OSTI)

Web Application Development, software quality, development practises, trade-off. In this paper we present our findings from a series of interviews with companies developing web applications, investigating how quality issues are managed when developing web applications in a rush-to-market and competitive environment. Our findings suggest that requirement practises are communication intensive, that companies perceive quality attributes related to a good user experience important, and that companies don’t have a clear trade-off situation. 1

Sven Ziemer

2006-01-01T23:59:59.000Z

476

Enrichment Assay Methods for a UF6 Cylinder Verification Station  

Science Conference Proceedings (OSTI)

International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are typically performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility’s entire cylinder inventory. These enrichment assay methods interrogate only a small fraction of the total cylinder volume, and are time-consuming and expensive to execute for inspectors. Pacific Northwest National Laboratory (PNNL) is developing an unattended measurement system capable of automated enrichment measurements over the full volume of Type 30B and Type 48 cylinders. This Integrated Cylinder Verification System (ICVS) could be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. The focus of this paper is the development of nondestructive assay (NDA) methods that combine “traditional” enrichment signatures (e.g. 185-keV emission from U-235) and more-penetrating “non-traditional” signatures (e.g. high-energy neutron-induced gamma rays spawned primarily from U-234 alpha emission) collected by medium-resolution gamma-ray spectrometers (i.e. sodium iodide or lanthanum bromide). The potential of these NDA methods for the automated assay of feed, tail and product cylinders is explored through MCNP modeling and with field measurements on a cylinder population ranging from 0.2% to 5% in U-235 enrichment.

Smith, Leon E.; Jordan, David V.; Misner, Alex C.; Mace, Emily K.; Orton, Christopher R.

2010-11-30T23:59:59.000Z

477

Analog Video Authentication and Seal Verification Equipment Development  

SciTech Connect

Under contract to the US Department of Energy in support of arms control treaty verification activities, the Savannah River National Laboratory in conjunction with the Pacific Northwest National Laboratory, the Idaho National Laboratory and Milagro Consulting, LLC developed equipment for use within a chain of custody regime. This paper discussed two specific devices, the Authentication Through the Lens (ATL) analog video authentication system and a photographic multi-seal reader. Both of these devices have been demonstrated in a field trial, and the experience gained throughout will also be discussed. Typically, cryptographic methods are used to prove the authenticity of digital images and video used in arms control chain of custody applications. However, in some applications analog cameras are used. Since cryptographic authentication methods will not work on analog video streams, a simple method of authenticating analog video was developed and tested. A photographic multi-seal reader was developed to image different types of visual unique identifiers for use in chain of custody and authentication activities. This seal reader is unique in its ability to image various types of seals including the Cobra Seal, Reflective Particle Tags, and adhesive seals. Flicker comparison is used to compare before and after images collected with the seal reader in order to detect tampering and verify the integrity of the seal.

Gregory Lancaster

2012-09-01T23:59:59.000Z

478

Tags and seals to strengthen arms control verification  

SciTech Connect

Tags and seals have long been recognized as important tools in arms control. The trend in control of armaments is to limit militarily significant equipment that is capable of being verified through direct and cooperative means, chiefly on-site inspection or monitoring. Although this paper will focus on the CFE treaty, the role of tags and seals for other treaties will also be addressed. Published technology and concepts will be reviewed, based on open sources. Arms control verification tags are defined as unique identifiers designed to be tamper-revealing; in that respect, seals are similar, being used as indicators of unauthorized access. Tamper-revealing tags are intended as single-point markers, seals for two-point couplings, and nets for volume containment. Seals usually bind two separate components, such as a hatch or flange that provides access to a secure compartment or a valve that controls fluid flow. A tamper-revealing net might be comprised of a coupled fiberoptic bundle wrapped around an object. Sometimes the term ``seal`` is used to denote the tamper-revealing feature of a tag that is attached to a surface, but in this paper the tamper-indicating connection is considered to be part of the tag concept itself.

DeVolpi, A.

1990-10-03T23:59:59.000Z

479

Development, Verification, and Validation of Multiphase Models for Polydisperse Flows  

Science Conference Proceedings (OSTI)

This report describes in detail the technical findings of the DOE Award entitled 'Development, Verification, and Validation of Multiphase Models for Polydisperse Flows.' The focus was on high-velocity, gas-solid flows with a range of particle sizes. A complete mathematical model was developed based on first principles and incorporated into MFIX. The solid-phase description took two forms: the Kinetic Theory of Granular Flows (KTGF) and Discrete Quadrature Method of Moments (DQMOM). The gas-solid drag law for polydisperse flows was developed over a range of flow conditions using Discrete Numerical Simulations (DNS). These models were verified via examination of a range of limiting cases and comparison with Discrete Element Method (DEM) data. Validation took the form of comparison with both DEM and experimental data. Experiments were conducted in three separate circulating fluidized beds (CFB's), with emphasis on the riser section. Measurements included bulk quantities like pressure drop and elutriation, as well as axial and radial measurements of bubble characteristics, cluster characteristics, solids flux, and differential pressure drops (axial only). Monodisperse systems were compared to their binary and continuous particle size distribution (PSD) counterparts. The continuous distributions examined included Gaussian, lognormal, and NETL-provided data for a coal gasifier.

Christine Hrenya; Ray Cocco; Rodney Fox; Shankar Subramaniam; Sankaran Sundaresan

2011-12-31T23:59:59.000Z

480

Qualitative constraint calculi: Heterogeneous verification of composition tables  

E-Print Network (OSTI)

In the domain of qualitative constraint reasoning, a subfield of AI which has evolved in the past 25 years, a large number of calculi for efficient reasoning about spatial and temporal entities has been developed. Reasoning techniques developed for these constraint calculi typically rely on so-called composition tables of the calculus at hand, which allow for replacing semantic reasoning by symbolic operations. Often these composition tables are developed in a quite informal, pictorial manner and hence composition tables are prone to errors. In view of possible safety critical applications of qualitative calculi, however, it is desirable to formally verify these composition tables. In general, the verification of composition tables is a tedious task, in particular in cases where the semantics of the calculus depends on higher-order constructs such as sets. In this paper we address this problem by presenting a heterogeneous proof method that allows for combining a higherorder proof assistance system (such as Isabelle) with an automatic (first order) reasoner (such as SPASS or VAMPIRE). The benefit of this method is that the number of proof obligations that is to be proven interactively with a semi-automatic reasoner can be minimized to an acceptable level.

Stefan Wölfl

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview verification purposes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Lightning Activities in the DOE-EPRI Turbine Verification Program  

DOE Green Energy (OSTI)

The US Department of Energy (DOE)-Electric Power Research Institute (EPRI) Turbine Verification Program (TVP) has played a vital role in improving the understanding of lightning protection for wind turbines. In response to concerns from host utilities, the TVP began a lightning protection project to study the impact of lightning activity at the 6.0-megawatt (MW) wind power facility in Ft. Davis, Texas. McNiff Light Industry (MLI) and Global Energy Concepts (GEC) established a broad observation and documentation effort to survey the lightning protection methodologies used and to evaluate the damage resulting from lightning activity at the turbines. The 6.05-MW wind power plant in Searsburg, Vermont, was inspected after a severe lightning storm caused damage to several turbines there. Zond, McNiff, and consultants from Lightning Technologies, Inc. conducted post-damage inspections at both sites to develop recommendations for improving lightning protection. Site operators implemented the recommended mitigation strategies, and the turbines were monitored to determine if the protection measures improved project operations. This paper summarizes the experience gained through TVP's lightning-related research, and provides a set of guidelines for wind turbine manufacturers, owners, and operators.

McCoy, T.; Rhoads, H.; Lisman, T. (Global Energy Concepts, LLC); McNiff, B. (McNiff Light Industry); Smith, B. (National Renewable Energy Laboratory)

2000-09-11T23:59:59.000Z

482

EPID-based verification of the MLC performance for dynamic IMRT and VMAT  

Science Conference Proceedings (OSTI)

Purpose: In advanced radiotherapy treatments such as intensity modulated radiation therapy (IMRT) and volumetric modulated arc therapy (VMAT), verification of the performance of the multileaf collimator (MLC) is an essential part of the linac QA program. The purpose of this study is to use the existing measurement methods for geometric QA of the MLCs and extend them to more comprehensive evaluation techniques, and to develop dedicated robust algorithms to quantitatively investigate the MLC performance in a fast, accurate, and efficient manner. Methods: The behavior of leaves was investigated in the step-and-shoot mode by the analysis of integrated electronic portal imaging device (EPID) images acquired during picket fence tests at fixed gantry angles and arc delivery. The MLC was also studied in dynamic mode by the analysis of cine EPID images of a sliding gap pattern delivered in a variety of conditions including different leaf speeds, deliveries at fixed gantry angles or in arc mode, and changing the direction of leaf motion. The accuracy of the method was tested by detection of the intentionally inserted errors in the delivery patterns. Results: The algorithm developed for the picket fence analysis was able to find each individual leaf position, gap width, and leaf bank skewness in addition to the deviations from expected leaf positions with respect to the beam central axis with sub-pixel accuracy. For the three tested linacs over a period of 5 months, the maximum change in the gap width was 0.5 mm, the maximum deviation from the expected leaf positions was 0.1 mm and the MLC skewness was up to 0.2 Degree-Sign . The algorithm developed for the sliding gap analysis could determine the velocity and acceleration/deceleration of each individual leaf as well as the gap width. There was a slight decrease in the accuracy of leaf performance with increasing leaf speeds. The analysis results were presented through several graphs. The accuracy of the method was assessed as 0.01 mm for both the gap size and peak position determination. Conclusions: This study provides fast, easy, and accurate test methods for routine QA of the MLC performance and helps in faster troubleshooting of MLC problems in both IMRT and VMAT treatments.

Rowshanfarzad, Pejman; Sabet, Mahsheed; Barnes, Michael P.; O'Connor, Daryl J.; Greer, Peter B. [School of Mathematical and Physical Sciences, University of Newcastle, Newcastle, NSW 2308 (Australia); Department of Radiation Oncology, Calvary Mater Newcastle Hospital, Newcastle, NSW 2310 (Australia); School of Mathematical and Physical Sciences, University of Newcastle, Newcastle, NSW 2308 (Australia); Department of Radiation Oncology, Calvary Mater Newcastle Hospital, Newcastle, NSW 2310, Australia and School of Mathematical and Physical Sciences, University of Newcastle, Newcastle, NSW 2308 (Australia)

2012-10-15T23:59:59.000Z

483

INDEPENDENT VERIFICATION SURVEY REPORT FOR ZONE 1 OF THE EAST TENNESSEE TECHNOLOGY PARK IN OAK RIDGE, TENNESSEE  

Science Conference Proceedings (OSTI)

Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs).

King, David A.

2012-08-16T23:59:59.000Z

484

INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK  

SciTech Connect

5098-SR-03-0 FINAL REPORT- INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS, BROOKHAVEN NATIONAL LABORATORY

P.C. Weaver

2010-12-15T23:59:59.000Z

485

HIERARCHICAL HYBRID-MODEL BASED DESIGN, VERIFICATION, SIMULATION, AND SYNTHESIS OF MISSION CONTROL FOR AUTONOMOUS UNDERWATER VEHICLES.  

E-Print Network (OSTI)

??The objective of modeling, verification, and synthesis of hierarchical hybrid mission control for underwater vehicle is to (i) propose a hierarchical architecture for mission control… (more)

Bhattacharyya, Siddhartha

2005-01-01T23:59:59.000Z

486

LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL  

Science Conference Proceedings (OSTI)

5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

P.C. Weaver

2010-10-22T23:59:59.000Z

487

Modeling and Verification of Distributed Generation and Voltage Regulation Equipment for Unbalanced Distribution Power Systems; Annual Subcontract Report, June 2007  

Science Conference Proceedings (OSTI)

This report summarizes the development of models for distributed generation and distribution circuit voltage regulation equipment for unbalanced power systems and their verification through actual field measurements.

Davis, M. W.; Broadwater, R.; Hambrick, J.

2007-07-01T23:59:59.000Z

488

Radiation risk and nuclear medicine: An interview with a Nobel Prize winner  

Science Conference Proceedings (OSTI)

In a speech given years ago at the Veterans Administration Medical Center, Bronx, NY, Rosalyn S. Yalow, 1977 Nobel Prize recipient for her invention of radioimmunoassay, made several salient points on the perception of fear or hazards from exposure to low-level radiation and low-level radioactive wastes. For the past three years, Yalow has been concerned with the general fear of radiation. In this interview, Newsline solicited Yalow`s views on public perceptions on radiation risk and what the nuclear medicine community can do to emphasize the fact that, if properly managed, the use of isotopes in medicine and other cases is not dangerous.

Yalow, R.S.

1995-12-01T23:59:59.000Z

489

General purpose rigid coaxial transmission lines and their associated flange connectors - Part 2 Detail specifications  

E-Print Network (OSTI)

Describes detail specifications for general purpose rigid coaxial transmission lines and their associated flange connectors.

International Electrotechnical Commission. Geneva

1996-01-01T23:59:59.000Z

490

Standard Practice for Electromagnetic (Eddy-Current) Examination of Copper Redraw Rod for Electrical Purposes  

E-Print Network (OSTI)

Standard Practice for Electromagnetic (Eddy-Current) Examination of Copper Redraw Rod for Electrical Purposes

American Society for Testing and Materials. Philadelphia

2009-01-01T23:59:59.000Z

491

An Interview with Chris Gunderson: Are Militaries Lagging Their Non-State Enemies in Use of Internet?  

Science Conference Proceedings (OSTI)

The increasing number of cyber attacks on military networks and servers has raised the question of what the global defense community is doing to safeguard military systems and protect the larger global Internet. Ubiquity's editor interviewed Chris Gunderson, ...

Peter Denning

2009-10-01T23:59:59.000Z

492

Comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From: Snyder, Richard A. (Roofing) [mailto:Richard.A.Snyder@saint-gobain.com] From: Snyder, Richard A. (Roofing) [mailto:Richard.A.Snyder@saint-gobain.com] Sent: Monday, May 09, 2011 1:02 PM To: ESTAR_Verification_Testing Cc: Chad.Fisher@us.ul.com; Matt.Overbee@ulenvironment.com; Brandt, Jim C. Subject: Verification Testing Concerns - Asphalt Roofing Products Importance: High Kathleen, I have many concerns and questions about Energy Star Verification program as it relates to Asphalt Roofing Shingles. I am VERY concerned because the attachment seems to imply that a decision on this matter could be made TODAY!!! Is that a possibility? I am not aware of much discussion going on, but if there is please make it public and let me know where to view it. 1) My first question is...is the attached document meant to cover asphalt roofing shingles? Many

493

NSS 18.3 Verification of Authorization Basis Documentation 12/8/03 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSS 18.3 Verification of Authorization Basis Documentation 12/8/03 NSS 18.3 Verification of Authorization Basis Documentation 12/8/03 NSS 18.3 Verification of Authorization Basis Documentation 12/8/03 The objective of this surveillance is for the Facility Representative to verify that the facility's configuration and operations remain consistent with the authorization basis. As defined in DOE Notice 411.1-1B, the authorization basis consists of those aspects of the facility design basis and operational requirements relied upon by DOE to authorize operation. These aspects are considered to be important to the safety of the facility operations. The authorization basis is described in documents such as the facility safety analysis report and other documented safety analyses; hazard classification documents, and the Technical Safety Requirements,

494

Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 9, 2011 May 9, 2011 DOE Verification Program May 9, 2011 Ashley Armstrong US Department of Energy Reference: DOE Verification Testing in Support of ENERGY STAR Subject: Comments from Hobart, Div. ITW Food Equipment Group Dear Ms. Armstrong, Hobart/ITW Food Equipment Group has been working diligently with the US EPA through NAFEM to ensure that the ENERGY STAR enhancements are fair to Food Service Equipment manufacturers. One of the mainstays has always been that Commercial Food Service equipment should not be required to be verification tested by a third party laboratory. We firmly believe that the proven method of periodic inspections by third-party certification bodies is more than adequate for verifying compliance with energy consumption standards. To that end, we

495

Comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energizer Battery Manufacturing, Inc 25225 Detroit Rd. Westlake, OH 44145 Energizer Comments On DOE Verification Testing in Support of ENERGY STAR 1. In the "Conditions and Criteria for Recognition of Certification Bodies for the ENERGY STAR® Program" document on page 3 it states in 3.a.i.2.a that "Annually test at least 10% of all ENERGY STAR qualified models the CB has certified or for which it has received qualified product data". Does the 10% of qualified models pertain to all products the lab has certified or is it 10% of each companies product? This is unclear, please add sufficient detail. 2. On page 7 under program funding, it states "For products tested by DOE under the ENERGY STAR verification program, DOE pays all costs for obtaining and testing products. Verification programs administered by CBs are

496

DOE/EA-1837:Final Environmental Assessment for the Performance Verification Laboratory (January 2011)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment for the Performance Verification Laboratory January 2011 DOE/EA-1837 This page left intentionally blank. Performance Verification Laboratory DOE/EA-1837 U.S. Department of Energy Final Environmental Assessment National Energy Technology Laboratory January 2011 i National Environmental Policy Act (NEPA) Compliance Cover Sheet Proposed Action: U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) is proposing to construct and operate a Performance Verification Laboratory (PVL) facility to be located on the Morgantown NETL site in West Virginia. NETL would design, construct, and make operational a DOE PVL facility for verifying the energy performance of selected appliances and equipment to facilitate improved enforcement of DOE energy conservation

497

On the Relation between Biometric Quality and User-Dependent Score Distributions in Fingerprint Verification  

E-Print Network (OSTI)

The lack of robustness against image quality degradation is a open issue in fingerprint verification. It has been found in previous studies that the behavior of a fingerprint verification system may vary depending on the quality of the fingerprints. In this paper, we study the performance for individual users under varying image conditions using a multisensor database acquired with three different fingerprint sensors. We propose a user-dependent score normalization scheme that exploits quality information, reaching an EER improvement of # 15% in one particular sensor. We have also included the proposed score normalization scheme in a multisensor fingerprint verification system that combines the three sensors, obtaining an EER improvement of # 13% in the best case .

Fernando Alonso-Fernandez; Raymond N. J. Veldhuis; Asker M. Bazen; Julian Fierrez-Aguilar; Javier Ortega-Garcia

2006-01-01T23:59:59.000Z

498

Workshop Purpose  

NLE Websites -- All DOE Office Websites (Extended Search)

7454 7454 Science Challenges and Design Concepts for the Next-Generation High-Performance FT-ICR Mass Spectrometer Summary of a workshop held January 16-17, 2008 at the National High Magnetic Field Laboratory, Tallahassee, Florida Jean H. Futrell Alan G. Marshall David W. Koppenaal Ljiljana Paša-Tolić Julie G. Wiley Organized by the National High Magnetic Field Laboratory and Environmental Molecular Sciences Laboratory Sponsored by the National Science Foundation and the U.S. Department of Energy 1 Introduction Mass spectrometry (MS) is among the most sensitive, molecule-specific, and generally applicable analytical techniques currently available. Although there are many important performance metrics, the mass resolving power of an analytical mass spectrometer is the ultimate

499

SERVICES Purpose  

E-Print Network (OSTI)

This Management Memo calls on all state agencies operating state motor vehicles to make every effort to “Flex Your Power at the Pump, ” and lower fuel costs for the State of California through vigorous compliance with the preventative maintenance standards identified in this management memo and in the Automobile Record, Standard (STD.) 271. Background Public Resources Code 25722 mandates the state reduce petroleum consumption of its vehicle fleet to the maximum extent practicable including improved preventative maintenance. State Administrative Manual Section (SAM) 4101 establishes the need to comply with minimum preventative maintenance standards listed in the Automobile Maintenance Record, STD. 271. This includes prescribed services and mechanical inspections that promote state vehicle efficiency and achieve optimum fuel mileage. SAM Section 3687.1 prohibits the purchase of premium grade gasoline for state vehicles. And, directs state drivers to make fuel purchases at lower priced self-service pumps whenever possible.

Manual Sections

2005-01-01T23:59:59.000Z

500

Interim Letter Report - Verification Survey of Partial Grids H19, J21, J22, X20, and X21 at the David Witherspoon, Inc. 1630 Site, Knoxville Tennessee  

SciTech Connect

Conduct verification surveys of available grids at the David Witherspoon Incorporated 1630 Site (DWI 1630) in Knoxville, Tennessee. The IVT conducted verification activities of partial grids H19, J21, J22, X20, and X21.

P.C. Weaver

2008-03-19T23:59:59.000Z