National Library of Energy BETA

Sample records for interview verification purposes

  1. INTERVIEWER:

    U.S. Energy Information Administration (EIA) Indexed Site

    authorized under Section 52 of the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. The purpose of this survey is to collect information about vehicles...

  2. Environmental assessment of general-purpose heat source safety verification testing

    SciTech Connect (OSTI)

    1995-02-01

    This Environmental Assessment (EA) was prepared to identify and evaluate potential environmental, safety, and health impacts associated with the Proposed Action to test General-Purpose Heat Source (GPHS) Radioisotope Thermoelectric Generator (RTG) assemblies at the Sandia National Laboratories (SNL) 10,000-Foot Sled Track Facility, Albuquerque, New Mexico. RTGs are used to provide a reliable source of electrical power on board some spacecraft when solar power is inadequate during long duration space missions. These units are designed to convert heat from the natural decay of radioisotope fuel into electrical power. Impact test data are required to support DOE`s mission to provide radioisotope power systems to NASA and other user agencies. The proposed tests will expand the available safety database regarding RTG performance under postulated accident conditions. Direct observations and measurements of GPHS/RTG performance upon impact with hard, unyielding surfaces are required to verify model predictions and to ensure the continual evolution of the RTG designs that perform safely under varied accident environments. The Proposed Action is to conduct impact testing of RTG sections containing GPHS modules with simulated fuel. End-On and Side-On impact test series are planned.

  3. Purpose

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purpose Determine which objects are attracted to a magnet. Performing the experiment 1. Touch the magnet to each object. Which objects or which portions of objects are attracted to the magnet? 2. See if you can attract the paper clip to one end of the magnet and then pick up another paper clip, or nail with the paper clip. 3. Rub the paper clip slowly over the magnet in its long direction about fifty times. Now try to pick up a second paper clip with the first paper clip, but without the

  4. Interview Travel

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interview Travel Interview Travel Travel preapproval and reimbursement process information for invited Laboratory job interviewees. Contact Travel Reservations (505) 667-1692 Email Student Travel (505) 667-5859 Interview travel process Interview travel will be reimbursed only when a Laboratory organization has invited a candidate to come to the Laboratory to interview for a specific job and the following process is used. Eligible expenses are paid post-interview only. Before beginning, review

  5. Carbon Storage Monitoring, Verification and Accounting Research |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Monitoring, Verification and Accounting Research Carbon Storage Monitoring, Verification and Accounting Research Reliable and cost-effective monitoring, verification and accounting (MVA) techniques are an important part of making geologic sequestration a safe, effective, and acceptable method for greenhouse gas control. MVA of geologic storage sites is expected to serve several purposes, including addressing safety and environmental concerns; inventory verification;

  6. An evaluation of the management system verification pilot at Hanford

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    1998-11-12

    The Chemical Management System (CMS), currently under development at Hanford, was used as the ''test program'' for pilot testing the value added aspects of the Chemical Manufacturers Association's (CMA) Management Systems Verification (MSV) process. The MSV process, which was developed by CMA's member chemical companies specifically as a tool to assist in the continuous improvement of environment, safety and health (ESH) performance, represents a commercial sector ''best practice'' for evaluating ESH management systems. The primary purpose of Hanford's MSV Pilot was to evaluate the applicability and utility of the MSV process in the Department of Energy (DOE) environment. However, because the Integrated Safety Management System (ISMS) is the framework for ESH management at Hanford and at all DOE sites, the pilot specifically considered the MSV process in the context of a possible future adjunct to Integrated Safety Management System Verification (ISMSV) efforts at Hanford and elsewhere within the DOE complex. The pilot involved the conduct of two-hour interviews with four separate panels of individuals with functional responsibilities related to the CMS including the Department of Energy Richland Operations (DOE-RL), Fluor Daniel Hanford (FDH) and FDH's major subcontractors (MSCS). A semi-structured interview process was employed by the team of three ''verifiers'' who directed open-ended questions to the panels regarding the development, integration and effectiveness of management systems necessary to ensure the sustainability of the CMS effort. An ''MSV Pilot Effectiveness Survey'' also was completed by each panel participant immediately following the interview.

  7. ORISE: Independent verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Independent verification ORISE techinician performs environmental scanning The Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessments and verification to determine the effectiveness of radiological cleanup at decontamination and decommissioning (D&D) projects across the United States. Since 1980, ORISE has performed independent verification at more than 500 sites in 42 states and the District of Columbia. As the primary independent verification

  8. Verification of Adaptive Systems

    SciTech Connect (OSTI)

    Pullum, Laura L; Cui, Xiaohui; Vassev, Emil; Hinchey, Mike; Rouff, Christopher; Buskens, Richard

    2012-01-01

    Adaptive systems are critical for future space and other unmanned and intelligent systems. Verification of these systems is also critical for their use in systems with potential harm to human life or with large financial investments. Due to their nondeterministic nature and extremely large state space, current methods for verification of software systems are not adequate to provide a high level of assurance for them. The combination of stabilization science, high performance computing simulations, compositional verification and traditional verification techniques, plus operational monitors, provides a complete approach to verification and deployment of adaptive systems that has not been used before. This paper gives an overview of this approach.

  9. Nuclear Data Verification and Standardization

    SciTech Connect (OSTI)

    Karam, Lisa R.; Arif, Muhammad; Thompson, Alan K.

    2011-10-01

    The objective of this interagency program is to provide accurate neutron interaction verification and standardization data for the U.S. Department of Energy Division of Nuclear Physics programs which include astrophysics, radioactive beam studies, and heavy-ion reactions. The measurements made in this program are also useful to other programs that indirectly use the unique properties of the neutron for diagnostic and analytical purposes. These include homeland security, personnel health and safety, nuclear waste disposal, treaty verification, national defense, and nuclear based energy production. The work includes the verification of reference standard cross sections and related neutron data employing the unique facilities and capabilities at NIST and other laboratories as required; leadership and participation in international intercomparisons and collaborations; and the preservation of standard reference deposits. An essential element of the program is critical evaluation of neutron interaction data standards including international coordinations. Data testing of critical data for important applications is included. The program is jointly supported by the Department of Energy and the National Institute of Standards and Technology.

  10. Voltage verification unit

    DOE Patents [OSTI]

    Martin, Edward J.

    2008-01-15

    A voltage verification unit and method for determining the absence of potentially dangerous potentials within a power supply enclosure without Mode 2 work is disclosed. With this device and method, a qualified worker, following a relatively simple protocol that involves a function test (hot, cold, hot) of the voltage verification unit before Lock Out/Tag Out and, and once the Lock Out/Tag Out is completed, testing or "trying" by simply reading a display on the voltage verification unit can be accomplished without exposure of the operator to the interior of the voltage supply enclosure. According to a preferred embodiment, the voltage verification unit includes test leads to allow diagnostics with other meters, without the necessity of accessing potentially dangerous bus bars or the like.

  11. Verification Monitoring Report

    Office of Legacy Management (LM)

    and Analytical Update for the Durango, Colorado, Processing Site August 2014 LMS/DUP/S11345 This page intentionally left blank LMS/DUP/S11345 Verification Monitoring Report and Analytical Update for the Durango, Colorado, Processing Site August 2014 This page intentionally left blank U.S. Department of Energy Verification Monitoring Report and Analytical Update-Durango, Colorado, Processing Site August 2014 Doc. No. S11345 Page i Contents Abbreviations

  12. Employment Eligibility Verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructions for Employment Eligibility Verification Department of Homeland Security U.S. Citizenship and Immigration Services USCIS Form I-9 OMB No. 1615-0047 Expires 03/31/2016 Read all instructions carefully before completing this form. Anti-Discrimination Notice. It is illegal to discriminate against any work-authorized individual in hiring, discharge, recruitment or referral for a fee, or in the employment eligibility verification (Form I-9 and E-Verify) process based on that individual's

  13. Measurement & Verification with Green Button Data | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurement & Verification with Green Button Data Measurement & Verification with Green ... Measurement and verification (M&V) focuses on ensuring that the savings from energy ...

  14. I. Purpose

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for EPAct 2005 Section 242 Program I. Purpose In the Energy Policy Act of 2005 (EPAct 2005; Public Law 109-58) Congress established a new program to support the expansion of hydropower energy development at existing dams and impoundments through an incentive payment procedure. Under section 242 of EPAct 2005, the Secretary of Energy is directed to provide incentive payments to the owner or operator of qualified hydroelectric facilities for electric energy generated and sold from a

  15. Verification and validation benchmarks.

    SciTech Connect (OSTI)

    Oberkampf, William Louis; Trucano, Timothy Guy

    2007-02-01

    Verification and validation (V&V) are the primary means to assess the accuracy and reliability of computational simulations. V&V methods and procedures have fundamentally improved the credibility of simulations in several high-consequence fields, such as nuclear reactor safety, underground nuclear waste storage, and nuclear weapon safety. Although the terminology is not uniform across engineering disciplines, code verification deals with assessing the reliability of the software coding, and solution verification deals with assessing the numerical accuracy of the solution to a computational model. Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and validation benchmarks have been constructed for a number of years in every field of computational simulation. However, no comprehensive guidelines have been proposed for the construction and use of V&V benchmarks. For example, the field of nuclear reactor safety has not focused on code verification benchmarks, but it has placed great emphasis on developing validation benchmarks. Many of these validation benchmarks are closely related to the operations of actual reactors at near-safety-critical conditions, as opposed to being more fundamental-physics benchmarks. This paper presents recommendations for the effective design and use of code verification benchmarks based on manufactured solutions, classical analytical solutions, and highly accurate numerical solutions. In addition, this paper presents recommendations for the design and use of validation benchmarks, highlighting the careful design of building-block experiments, the estimation of experimental measurement uncertainty for both inputs and outputs to the code, validation metrics, and the role of model calibration in validation. It is argued that the understanding of predictive capability of a computational model is built on the level of

  16. Environmental Technology Verification of Mobile Sources Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Technology Verification of Mobile Sources Control Technologies Environmental Technology Verification of Mobile Sources Control Technologies 2005 Diesel Engine...

  17. DOE Challenge Home Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home Verification Projected Rating: Based on Plans - Field Confirmation Required. Energy Performance House Ty pe DOE Challenge Home Builder Partner ID# Single-family det ac hed 12345 Y ear built Square footage of Conditioned Space including Basement 2013 3968.0 Numbe r of Bedrooms Square footage of Conditioned Space without Basement 4 2368.0 Site addre ss (if no t available , list the site Lo t #) Registered Builder 555 Main St r eet Cold City Certified Rater MN, 20853 HERS Index

  18. verification | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    verification Nuclear Verification Challenge: Maintain the U.S. ability to monitor and verify nuclear reduction agreements and detect violations of treaties and other nuclear nonproliferation commitments. Solution: Develop and deploy measures to ensure verifiable compliance with treaties and other international agreements,... International Nuclear Safeguards Challenge: Detect/deter undeclared nuclear materials and activities. Solution: Build capacity of the International Atomic Energy Agency and

  19. Software Verification and Validation Procedure

    SciTech Connect (OSTI)

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  20. Benefits of Evaluation, Measurement, and Verification | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Benefits of Evaluation, Measurement, and Verification Benefits of Evaluation, Measurement, and Verification This document provides information about the benefits of performing ...

  1. International comparison of product certification and verification methods for appliances

    SciTech Connect (OSTI)

    Zhou, Nan; Romankiewicz, John; Fridley, David; Zheng, Nina

    2012-06-01

    Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

  2. International Comparison of Product Certification and Verification Methods for Appliances

    SciTech Connect (OSTI)

    Zhou, Nan; Romankiewicz, John; Fridley, David; Zheng, Nina

    2012-06-01

    Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

  3. Become an SEP Verification Body

    Broader source: Energy.gov [DOE]

    Superior Energy Performance® (SEP™) establishes a high standard in energy management and performance, and SEP certification validates your commitment to energy efficiency by verifying your achieved energy performance improvement using an ANSI-ANAB Accredited Verification body. This third-party verification provides independent confirmation of energy performance achievements and commitment to managing energy use. Currently, SEP is the only national certification program offering this level of rigor and credibility to industrial facilities through accredited third-party verification of sustained energy performance improvements.

  4. Recommendation 207: Automate the Stewardship Verification Process

    Broader source: Energy.gov [DOE]

    ORSSAB recommends DOE automate the Stewardship Verification Process for the Remediation Effectiveness Report.

  5. ESPC ENABLE Measurement and Verification Plan Template

    Broader source: Energy.gov [DOE]

    Document contains a comprehensive measurement and verification plan template for a proposed ESPC ENABLE project.

  6. Enhanced Verification Test Suite for Physics Simulation Codes

    SciTech Connect (OSTI)

    Kamm, J R; Brock, J S; Brandon, S T; Cotrell, D L; Johnson, B; Knupp, P; Rider, W; Trucano, T; Weirs, V G

    2008-10-10

    This document discusses problems with which to augment, in quantity and in quality, the existing tri-laboratory suite of verification problems used by Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), and Sandia National Laboratories (SNL). The purpose of verification analysis is demonstrate whether the numerical results of the discretization algorithms in physics and engineering simulation codes provide correct solutions of the corresponding continuum equations. The key points of this document are: (1) Verification deals with mathematical correctness of the numerical algorithms in a code, while validation deals with physical correctness of a simulation in a regime of interest. This document is about verification. (2) The current seven-problem Tri-Laboratory Verification Test Suite, which has been used for approximately five years at the DOE WP laboratories, is limited. (3) Both the methodology for and technology used in verification analysis have evolved and been improved since the original test suite was proposed. (4) The proposed test problems are in three basic areas: (a) Hydrodynamics; (b) Transport processes; and (c) Dynamic strength-of-materials. (5) For several of the proposed problems we provide a 'strong sense verification benchmark', consisting of (i) a clear mathematical statement of the problem with sufficient information to run a computer simulation, (ii) an explanation of how the code result and benchmark solution are to be evaluated, and (iii) a description of the acceptance criterion for simulation code results. (6) It is proposed that the set of verification test problems with which any particular code be evaluated include some of the problems described in this document. Analysis of the proposed verification test problems constitutes part of a necessary--but not sufficient--step that builds confidence in physics and engineering simulation codes. More complicated test cases, including physics models of greater

  7. The Integrated Safety Management System Verification Enhancement Review of the Plutonium Finishing Plant (PFP)

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    2000-02-09

    The primary purpose of the verification enhancement review was for the DOE Richland Operations Office (RL) to verify contractor readiness for the independent DOE Integrated Safety Management System Verification (ISMSV) on the Plutonium Finishing Plant (PFP). Secondary objectives included: (1) to reinforce the engagement of management and to gauge management commitment and accountability; (2) to evaluate the ''value added'' benefit of direct public involvement; (3) to evaluate the ''value added'' benefit of direct worker involvement; (4) to evaluate the ''value added'' benefit of the panel-to-panel review approach; and, (5) to evaluate the utility of the review's methodology/adaptability to periodic assessments of ISM status. The review was conducted on December 6-8, 1999, and involved the conduct of two-hour interviews with five separate panels of individuals with various management and operations responsibilities related to PFP. A semi-structured interview process was employed by a team of five ''reviewers'' who directed open-ended questions to the panels which focused on: (1) evidence of management commitment, accountability, and involvement; and, (2) consideration and demonstration of stakeholder (including worker) information and involvement opportunities. The purpose of a panel-to-panel dialogue approach was to better spotlight: (1) areas of mutual reinforcement and alignment that could serve as good examples of the management commitment and accountability aspects of ISMS implementation, and, (2) areas of potential discrepancy that could provide opportunities for improvement. In summary, the Review Team found major strengths to include: (1) the use of multi-disciplinary project work teams to plan and do work; (2) the availability and broad usage of multiple tools to help with planning and integrating work; (3) senior management presence and accessibility; (4) the institutionalization of worker involvement; (5) encouragement of self-reporting and self

  8. Guidelines for the verification and validation of expert system software and conventional software: Survey and documentation of expert system verification and validation methodologies. Volume 3

    SciTech Connect (OSTI)

    Groundwater, E.H.; Miller, L.A.; Mirsky, S.M.

    1995-03-01

    This report is the third volume in the final report for the Expert System Verification and Validation (V&V) project which was jointly sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute. The ultimate objective is the formulation of guidelines for the V&V of expert systems for use in nuclear power applications. The purpose of this activity was to survey and document techniques presently in use for expert system V&V. The survey effort included an extensive telephone interviewing program, site visits, and a thorough bibliographic search and compilation. The major finding was that V&V of expert systems is not nearly as established or prevalent as V&V of conventional software systems. When V&V was used for expert systems, it was almost always at the system validation stage after full implementation and integration usually employing the non-systematic dynamic method of {open_quotes}ad hoc testing.{close_quotes} There were few examples of employing V&V in the early phases of development and only weak sporadic mention of the possibilities in the literature. There is, however, a very active research area concerning the development of methods and tools to detect problems with, particularly, rule-based expert systems. Four such static-testing methods were identified which were not discovered in a comprehensive review of conventional V&V methods in an earlier task.

  9. AHAM DOE Verification Test Agreement | Department of Energy

    Energy Savers [EERE]

    DOE Verification Test Agreement AHAM DOE Verification Test Agreement This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing ...

  10. Summary of FY13 Industry Interviews

    SciTech Connect (OSTI)

    Hund, Gretchen; Kurzrok, Andrew J.; Seward, Amy M.; Wyse, Evan T.; Gunawardena, Navindra H.

    2013-09-01

    This white paper discusses the industry self-regulation project’s outreach interview activities for FY13 and summarizes conclusions.

  11. ARM - Carlos Sousa Interview (English Version)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DeployementCarlos Sousa Interview (English Version) Azores Deployment AMF Home Graciosa Island Home Data Plots and Baseline Instruments Satellite Retrievals Experiment Planning...

  12. Uncertainty in verification and validation: recent perspective...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 99 GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; VALIDATION; VERIFICATION; COMPUTER ...

  13. Verification of RESRAD-build computer code, version 3.1.

    SciTech Connect (OSTI)

    2003-06-02

    RESRAD-BUILD is a computer model for analyzing the radiological doses resulting from the remediation and occupancy of buildings contaminated with radioactive material. It is part of a family of codes that includes RESRAD, RESRAD-CHEM, RESRAD-RECYCLE, RESRAD-BASELINE, and RESRAD-ECORISK. The RESRAD-BUILD models were developed and codified by Argonne National Laboratory (ANL); version 1.5 of the code and the user's manual were publicly released in 1994. The original version of the code was written for the Microsoft DOS operating system. However, subsequent versions of the code were written for the Microsoft Windows operating system. The purpose of the present verification task (which includes validation as defined in the standard) is to provide an independent review of the latest version of RESRAD-BUILD under the guidance provided by ANSI/ANS-10.4 for verification and validation of existing computer programs. This approach consists of a posteriori V&V review which takes advantage of available program development products as well as user experience. The purpose, as specified in ANSI/ANS-10.4, is to determine whether the program produces valid responses when used to analyze problems within a specific domain of applications, and to document the level of verification. The culmination of these efforts is the production of this formal Verification Report. The first step in performing the verification of an existing program was the preparation of a Verification Review Plan. The review plan consisted of identifying: Reason(s) why a posteriori verification is to be performed; Scope and objectives for the level of verification selected; Development products to be used for the review; Availability and use of user experience; and Actions to be taken to supplement missing or unavailable development products. The purpose, scope and objectives for the level of verification selected are described in this section of the Verification Report. The development products that were used for

  14. Verification Challenges at Low Numbers

    SciTech Connect (OSTI)

    Benz, Jacob M.; Booker, Paul M.; McDonald, Benjamin S.

    2013-06-01

    Many papers have dealt with the political difficulties and ramifications of deep nuclear arms reductions, and the issues of “Going to Zero”. Political issues include extended deterrence, conventional weapons, ballistic missile defense, and regional and geo-political security issues. At each step on the road to low numbers, the verification required to ensure compliance of all parties will increase significantly. Looking post New START, the next step will likely include warhead limits in the neighborhood of 1000 . Further reductions will include stepping stones at1000 warheads, 100’s of warheads, and then 10’s of warheads before final elimination could be considered of the last few remaining warheads and weapons. This paper will focus on these three threshold reduction levels, 1000, 100’s, 10’s. For each, the issues and challenges will be discussed, potential solutions will be identified, and the verification technologies and chain of custody measures that address these solutions will be surveyed. It is important to note that many of the issues that need to be addressed have no current solution. In these cases, the paper will explore new or novel technologies that could be applied. These technologies will draw from the research and development that is ongoing throughout the national laboratory complex, and will look at technologies utilized in other areas of industry for their application to arms control verification.

  15. Mobile Pit verification system design based on passive special nuclear material verification in weapons storage facilities

    SciTech Connect (OSTI)

    Paul, J. N.; Chin, M. R.; Sjoden, G. E.

    2013-07-01

    A mobile 'drive by' passive radiation detection system to be applied in special nuclear materials (SNM) storage facilities for validation and compliance purposes has been designed through the use of computational modeling and new radiation detection methods. This project was the result of work over a 1 year period to create optimal design specifications to include creation of 3D models using both Monte Carlo and deterministic codes to characterize the gamma and neutron leakage out each surface of SNM-bearing canisters. Results were compared and agreement was demonstrated between both models. Container leakages were then used to determine the expected reaction rates using transport theory in the detectors when placed at varying distances from the can. A 'typical' background signature was incorporated to determine the minimum signatures versus the probability of detection to evaluate moving source protocols with collimation. This established the criteria for verification of source presence and time gating at a given vehicle speed. New methods for the passive detection of SNM were employed and shown to give reliable identification of age and material for highly enriched uranium (HEU) and weapons grade plutonium (WGPu). The finalized 'Mobile Pit Verification System' (MPVS) design demonstrated that a 'drive-by' detection system, collimated and operating at nominally 2 mph, is capable of rapidly verifying each and every weapon pit stored in regularly spaced, shelved storage containers, using completely passive gamma and neutron signatures for HEU and WGPu. This system is ready for real evaluation to demonstrate passive total material accountability in storage facilities. (authors)

  16. Automated radiotherapy treatment plan integrity verification

    SciTech Connect (OSTI)

    Yang Deshan; Moore, Kevin L.

    2012-03-15

    Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

  17. Fit for Purpose Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that needs to be addressed by current and future Fit-for-Purpose projects includes: Reservoir pressure management - In deep saline formations, pressure increases due to...

  18. ESPC ENABLE Measurement and Verification Protocol

    Broader source: Energy.gov [DOE]

    Document provides an overview of the Measurement and Verification (M&V) Protocol utilized within ENABLE energy savings performance contract projects.

  19. Headquarters Employment Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employment Verification Headquarters Employment Verification M&P Employees should contact Marilyn Samuels at 202-586-8571 for basic employment verification. S&E Employees should contact the Benefits Branch for basic employment verification. Requests should be faxed to 865-576-5050. If a fax is not available, please email requests to SESSCBenefits@hc.doe.gov This is for "is this person employed here?", or "how long has this person been employed?". There will be no

  20. Verification and validation benchmarks. (Technical Report) |...

    Office of Scientific and Technical Information (OSTI)

    Validation addresses the physics modeling accuracy of a computational simulation by comparing the computational results with experimental data. Code verification benchmarks and ...

  1. Lessons Learned from Independent Verification Activities

    Office of Environmental Management (EM)

    Demonstration Oak Ridge Institute for Science and Education - Independent Verification Lessons Learned IV - performed at nine DOE sites from 2004 to 2008 Page 1 of 2 Oak Ridge ...

  2. Superior Energy Performance Measurement and Verification Protocol...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Superior Energy Performance logo This Measurement and Verification Protocol for Industry defines the procedures that will be used to confirm conformance with the energy performance ...

  3. Verification and validation benchmarks. (Technical Report) |...

    Office of Scientific and Technical Information (OSTI)

    high-consequence fields, such as nuclear reactor safety, underground nuclear waste ... For example, the field of nuclear reactor safety has not focused on code verification ...

  4. Input apparatus for dynamic signature verification systems

    DOE Patents [OSTI]

    EerNisse, Errol P.; Land, Cecil E.; Snelling, Jay B.

    1978-01-01

    The disclosure relates to signature verification input apparatus comprising a writing instrument and platen containing piezoelectric transducers which generate signals in response to writing pressures.

  5. DOE Zero Energy Ready Home Verification...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Home Verification Summary DRAFT REMRate - Residential Energy Analysis and Rating Software ... Followed the DOE Zero Energy Ready Home Quality Management Guidelines X The buyer of this ...

  6. Why do verification and validation?

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hu, Kenneth T.; Paez, Thomas L.

    2016-02-19

    In this discussion paper, we explore different ways to assess the value of verification and validation (V&V) of engineering models. We first present a literature review on the value of V&V and then use value chains and decision trees to show how value can be assessed from a decision maker's perspective. In this context, the value is what the decision maker is willing to pay for V&V analysis with the understanding that the V&V results are uncertain. As a result, the 2014 Sandia V&V Challenge Workshop is used to illustrate these ideas.

  7. A video interview with Fred Dylla, AIP CEO (SPIE Newsroom) |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsarticlesvideo-interview-fred-dylla-aip-ceo-spie-newsroom A video interview with Fred Dylla, AIP CEO Dylla was interviewed at Photonics West 2008 by Rich...

  8. Systems Analysis Workshop Purpose

    Broader source: Energy.gov [DOE]

    Presentation on SAW purpose to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004 to discuss and define role of systems analysis in DOE Hydrogen Program.

  9. verification

    National Nuclear Security Administration (NNSA)

    %2A en NGSI Safeguards by Design http:nnsa.energy.govaboutusourprogramsdnnnissafeguardssbd

  10. verification

    National Nuclear Security Administration (NNSA)

    information with the need to obtain enough data to inform the process.

    Michele Smith, Deputy Director for the Warhead Dismantlement Transparency Program within NNSA's...

  11. Poster Presentation Purpose

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Presentation Purpose The primary purpose of the poster presentation is to provide an opportunity to communicate the results of research and to initiate discussion among science colleagues. Because poster presentations are usually done in groups, with observers milling around a large room of posters, the presentations are relaxed and more conducive to the exchange of ideas and techniques between presenters and observers. The Poster A good poster is uncluttered and clear in design. It has legible

  12. The monitoring and verification of nuclear weapons

    SciTech Connect (OSTI)

    Garwin, Richard L.

    2014-05-09

    This paper partially reviews and updates the potential for monitoring and verification of nuclear weapons, including verification of their destruction. Cooperative monitoring with templates of the gamma-ray spectrum are an important tool, dependent on the use of information barriers.

  13. Declaration of Construction Completion and Verification of Readiness...

    Energy Savers [EERE]

    Declaration of Construction Completion and Verification of Readiness to Test Declaration of Construction Completion and Verification of Readiness to Test Salt Waste Processing ...

  14. Numerical Verification of Bounce Harmonic Resonances in Neoclassical

    Office of Scientific and Technical Information (OSTI)

    for Tokamaks Kimin Kim, Jong-Kyu Park and Allen H. Boozer 70 PLASMA PHYSICS AND FUSION TECHNOLOGY Tokamaks, Numerical Verification Tokamaks, Numerical Verification This...

  15. Verification of J-integral capability in Sierra Mechanics. (Technical...

    Office of Scientific and Technical Information (OSTI)

    Verification of J-integral capability in Sierra Mechanics. Citation Details In-Document Search Title: Verification of J-integral capability in Sierra Mechanics. You are...

  16. California ARB Verification Testing of the CBSTM Soot Filter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California ARB Verification Testing of the CBSTM Soot Filter for Stationary Diesel Applications California ARB Verification Testing of the CBSTM Soot Filter for Stationary Diesel ...

  17. CARB Verification of Catalyzed Diesel Particulate Filters for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets 2005 ...

  18. ENERGY STAR Appliance Verification Testing - Pilot Program Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated ...

  19. FAQ's for: ENERGY STAR Verification Testing Pilot Program dated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010 This document is the ...

  20. Code Verification of the HIGRAD Computational Fluid Dynamics Solver

    SciTech Connect (OSTI)

    Van Buren, Kendra L.; Canfield, Jesse M.; Hemez, Francois M.; Sauer, Jeremy A.

    2012-05-04

    The purpose of this report is to outline code and solution verification activities applied to HIGRAD, a Computational Fluid Dynamics (CFD) solver of the compressible Navier-Stokes equations developed at the Los Alamos National Laboratory, and used to simulate various phenomena such as the propagation of wildfires and atmospheric hydrodynamics. Code verification efforts, as described in this report, are an important first step to establish the credibility of numerical simulations. They provide evidence that the mathematical formulation is properly implemented without significant mistakes that would adversely impact the application of interest. Highly accurate analytical solutions are derived for four code verification test problems that exercise different aspects of the code. These test problems are referred to as: (i) the quiet start, (ii) the passive advection, (iii) the passive diffusion, and (iv) the piston-like problem. These problems are simulated using HIGRAD with different levels of mesh discretization and the numerical solutions are compared to their analytical counterparts. In addition, the rates of convergence are estimated to verify the numerical performance of the solver. The first three test problems produce numerical approximations as expected. The fourth test problem (piston-like) indicates the extent to which the code is able to simulate a 'mild' discontinuity, which is a condition that would typically be better handled by a Lagrangian formulation. The current investigation concludes that the numerical implementation of the solver performs as expected. The quality of solutions is sufficient to provide credible simulations of fluid flows around wind turbines. The main caveat associated to these findings is the low coverage provided by these four problems, and somewhat limited verification activities. A more comprehensive evaluation of HIGRAD may be beneficial for future studies.

  1. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They ...

  2. ICDF Complex Waste Profile and Verification Sample Guidance

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-10-01

    This guidance document will assist waste generators who characterize waste streams destined for disposal at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) Complex. The purpose of this document is to develop a conservative but appropriate way to (1) characterize waste for entry into the ICDF; (2) ensure compliance with the waste acceptance criteria; and (3) facilitate disposal at the ICDF landfill or evaporation pond. In addition, this document will establish the waste verification process used by ICDF personnel to ensure that untreated waste meets applicable ICDF acceptance limits

  3. Verification/acceptance test report for the Acromag Calibration System for TMACS

    SciTech Connect (OSTI)

    Fordham, C.R.

    1995-04-25

    This document provides the Verification/Acceptance Test Report for the Acromag Calibration System (ACS) for the Tank Monitor and Control System. ACS will be implemented to check the calibration of the thermocouple input modules. Purpose of this document is to show that the ACS satisfies the system requirements in WHC-SD-WM-CSRS-009 (WHC 1993b).

  4. Integrated safety management system verification: Volume 1

    SciTech Connect (OSTI)

    Christensen, R.F.

    1998-08-12

    Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System. The Manager, Richland Operations Office (RL), initiated a combined Phase 1 and Phase 2 Integrated Safety Management Verification review to confirm that PNNL had successfully submitted a description of their ISMS and had implemented ISMS within the laboratory facilities and processes. A combined review was directed by the Manager, RL, based upon the progress PNNL had made in the implementation of ISM. This report documents the results of the review conducted to verify: (1) that the PNNL integrated safety management system description and enabling documents and processes conform to the guidance provided by the Manager, RL; (2) that corporate policy is implemented by line managers; (3) that PNNL has provided tailored direction to the facility management; and (4) the Manager, RL, has documented processes that integrate their safety activities and oversight with those of PNNL. The general conduct of the review was consistent with the direction provided by the Under Secretary`s Draft Safety Management System Review and Approval Protocol. The purpose of this review was to provide the Manager, RL, with a recommendation to the adequacy of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and, to provide an evaluation of the extent and maturity of ISMS implementation within the Laboratory. Further, this review was intended to provide a model for other DOE Laboratories. In an effort to reduce the time and travel costs associated with ISM verification the team agreed to conduct preliminary training and orientation electronically and by phone. These

  5. Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RESTART NUCLEAR FACILITIES | Department of Energy 5.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness review (RR), 2) determining the startup authorization authority (SAA), and

  6. DOE Zero Energy Ready Home Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Verification DOE Zero Energy Ready Home Verification DOE Zero Energy Ready Homes Verification, a publication of the U.S. Department of Energy Zero Energy Ready Homes program. DOE Zero Energy Ready Home - Verification Report.pdf (47.44 KB) More Documents & Publications The Appraisal Process: Be Your Own Advocate Prescriptive Path compliance form ZERO ENERGY READY HOME UPDATE NEWSLETTER AUGUST 2014

  7. MENTORING PROGRAM Purpose

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Last Revised: February 5, 2013 MENTORING PROGRAM Purpose To provide a formal structure to develop employees through mentoring with other professionals at the Ames Laboratory. The mentoring program includes a focus on critical positions that have no succession planning in place. Objectives * To promote individual development through the transfer of skills, expert knowledge and insight. * To provide an additional resource for feedback and guidance. * To develop an internal pipeline for succession

  8. Evaluation, Measurement, and Verification Overview | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document provides an overview and definition of EM&V. PDF icon What is EMV? More ... and Verification Plan for Your Energy Efficiency ProjectProgram Developing an ...

  9. Assessment of Advanced Measurement and Verification Methods ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (M&V 2.0) Assessment of Advanced Measurement and Verification Methods (M&V 2.0) Automated M&V from Noesis Automated M&V from Noesis Lead Performer: Lawrence Berkeley ...

  10. Verification & Validation | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Verification & Validation Verification and Validation (V&V) provides assurance that the models in the codes produce mathematically correct answers and that the answers reflect physical reality. The V&V subprogram funds the critical skills needed to apply systematic measurement, documentation, and demonstration of the ability of the models and codes to predict physical behavior. The V&V subprogram is developing and implementing Uncertainty Quantification (UQ)

  11. Oak Ridge Associated VERIFICATION Universities OF OF

    Office of Legacy Management (LM)

    y /I/ i Prepared by Oak Ridge Associated VERIFICATION Universities OF OF - Prepared for the Decontamination and 1985 AND 1986 REMEDIAL ACTIONS Decommissioning Division NIAGARA FALLS STORAGE SITE U.S. Department VICINITY PROPERTIES of Energy of Energy LEWISTON, NEW YORK 3I~~~~ ~~~J. D. BERGER l I I I I I Environmental Survey and Site Assessment Program Energy/Environment Systems Division FINAL REPORT JULY 1990 VERIFICATION OF 1985 AND 1986 REMEDIAL ACTIONS NIAGARA FALLS STORAGE SITE VICINITY

  12. Environmental Technology Verification of Mobile Sources Control

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies | Department of Energy Environmental Technology Verification of Mobile Sources Control Technologies Environmental Technology Verification of Mobile Sources Control Technologies 2005 Diesel Engine Emissions Reduction (DEER) Conference Presentations and Posters 2005_deer_elion.pdf (158.94 KB) More Documents & Publications EPA Mobile Source Rule Update Efficient Use of Natural Gas Based Fuels in Heavy-Duty Engines The California Demonstration Program for Control of PM from

  13. Monitoring and verification R&D

    SciTech Connect (OSTI)

    Pilat, Joseph F; Budlong - Sylvester, Kory W; Fearey, Bryan L

    2011-01-01

    The 2010 Nuclear Posture Review (NPR) report outlined the Administration's approach to promoting the agenda put forward by President Obama in Prague on April 5, 2009. The NPR calls for a national monitoring and verification R&D program to meet future challenges arising from the Administration's nonproliferation, arms control and disarmament agenda. Verification of a follow-on to New START could have to address warheads and possibly components along with delivery capabilities. Deeper cuts and disarmament would need to address all of these elements along with nuclear weapon testing, nuclear material and weapon production facilities, virtual capabilities from old weapon and existing energy programs and undeclared capabilities. We only know how to address some elements of these challenges today, and the requirements may be more rigorous in the context of deeper cuts as well as disarmament. Moreover, there is a critical need for multiple options to sensitive problems and to address other challenges. There will be other verification challenges in a world of deeper cuts and disarmament, some of which we are already facing. At some point, if the reductions process is progressing, uncertainties about past nuclear materials and weapons production will have to be addressed. IAEA safeguards will need to continue to evolve to meet current and future challenges, and to take advantage of new technologies and approaches. Transparency/verification of nuclear and dual-use exports will also have to be addressed, and there will be a need to make nonproliferation measures more watertight and transparent. In this context, and recognizing we will face all of these challenges even if disarmament is not achieved, this paper will explore possible agreements and arrangements; verification challenges; gaps in monitoring and verification technologies and approaches; and the R&D required to address these gaps and other monitoring and verification challenges.

  14. DOE handbook: Integrated safety management systems (ISMS) verification team leader`s handbook

    SciTech Connect (OSTI)

    1999-06-01

    The primary purpose of this handbook is to provide guidance to the ISMS verification Team Leader and the verification team in conducting ISMS verifications. The handbook describes methods and approaches for the review of the ISMS documentation (Phase I) and ISMS implementation (Phase II) and provides information useful to the Team Leader in preparing the review plan, selecting and training the team, coordinating the conduct of the verification, and documenting the results. The process and techniques described are based on the results of several pilot ISMS verifications that have been conducted across the DOE complex. A secondary purpose of this handbook is to provide information useful in developing DOE personnel to conduct these reviews. Specifically, this handbook describes methods and approaches to: (1) Develop the scope of the Phase 1 and Phase 2 review processes to be consistent with the history, hazards, and complexity of the site, facility, or activity; (2) Develop procedures for the conduct of the Phase 1 review, validating that the ISMS documentation satisfies the DEAR clause as amplified in DOE Policies 450.4, 450.5, 450.6 and associated guidance and that DOE can effectively execute responsibilities as described in the Functions, Responsibilities, and Authorities Manual (FRAM); (3) Develop procedures for the conduct of the Phase 2 review, validating that the description approved by the Approval Authority, following or concurrent with the Phase 1 review, has been implemented; and (4) Describe a methodology by which the DOE ISMS verification teams will be advised, trained, and/or mentored to conduct subsequent ISMS verifications. The handbook provides proven methods and approaches for verifying that commitments related to the DEAR, the FRAM, and associated amplifying guidance are in place and implemented in nuclear and high risk facilities. This handbook also contains useful guidance to line managers when preparing for a review of ISMS for radiological

  15. Requirements Based Surveillance and Maintenance Review Process Interview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form | Department of Energy Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form (313.11 KB) More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Guidance to Completing the Self-Directed RBSM Interview Form CX-000473: Categorical Exclusion

  16. Verification of operating software for cooperative monitoring applications

    SciTech Connect (OSTI)

    Tolk, K.M.; Rembold, R.K.

    1997-08-01

    Monitoring agencies often use computer based equipment to control instruments and to collect data at sites that are being monitored under international safeguards or other cooperative monitoring agreements. In order for this data to be used as an independent verification of data supplied by the host at the facility, the software used must be trusted by the monitoring agency. The monitoring party must be sure that the software has not be altered to give results that could lead to erroneous conclusions about nuclear materials inventories or other operating conditions at the site. The host might also want to verify that the software being used is the software that has been previously inspected in order to be assured that only data that is allowed under the agreement is being collected. A description of a method to provide this verification using keyed has functions and how the proposed method overcomes possible vulnerabilities in methods currently in use such as loading the software from trusted disks is presented. The use of public key data authentication for this purpose is also discussed.

  17. Fuel Retrieval System (FRS) Design Verification

    SciTech Connect (OSTI)

    YANOCHKO, R.M.

    2000-01-27

    This document was prepared as part of an independent review to explain design verification activities already completed, and to define the remaining design verification actions for the Fuel Retrieval System. The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR).

  18. Land Ice Verification and Validation Kit

    Energy Science and Technology Software Center (OSTI)

    2015-07-15

    To address a pressing need to better understand the behavior and complex interaction of ice sheets within the global Earth system, significant development of continental-scale, dynamical ice-sheet models is underway. The associated verification and validation process of these models is being coordinated through a new, robust, python-based extensible software package, the Land Ice Verification and Validation toolkit (LIVV). This release provides robust and automated verification and a performance evaluation on LCF platforms. The performance V&Vmore » involves a comprehensive comparison of model performance relative to expected behavior on a given computing platform. LIVV operates on a set of benchmark and test data, and provides comparisons for a suite of community prioritized tests, including configuration and parameter variations, bit-4-bit evaluation, and plots of tests where differences occur.« less

  19. Land Ice Verification and Validation Kit

    SciTech Connect (OSTI)

    2015-07-15

    To address a pressing need to better understand the behavior and complex interaction of ice sheets within the global Earth system, significant development of continental-scale, dynamical ice-sheet models is underway. The associated verification and validation process of these models is being coordinated through a new, robust, python-based extensible software package, the Land Ice Verification and Validation toolkit (LIVV). This release provides robust and automated verification and a performance evaluation on LCF platforms. The performance V&V involves a comprehensive comparison of model performance relative to expected behavior on a given computing platform. LIVV operates on a set of benchmark and test data, and provides comparisons for a suite of community prioritized tests, including configuration and parameter variations, bit-4-bit evaluation, and plots of tests where differences occur.

  20. Active alignment/contact verification system

    DOE Patents [OSTI]

    Greenbaum, William M.

    2000-01-01

    A system involving an active (i.e. electrical) technique for the verification of: 1) close tolerance mechanical alignment between two component, and 2) electrical contact between mating through an elastomeric interface. For example, the two components may be an alumina carrier and a printed circuit board, two mating parts that are extremely small, high density parts and require alignment within a fraction of a mil, as well as a specified interface point of engagement between the parts. The system comprises pairs of conductive structures defined in the surfaces layers of the alumina carrier and the printed circuit board, for example. The first pair of conductive structures relate to item (1) above and permit alignment verification between mating parts. The second pair of conductive structures relate to item (2) above and permit verification of electrical contact between mating parts.

  1. Fuel Retrieval System Design Verification Report

    SciTech Connect (OSTI)

    GROTH, B.D.

    2000-04-11

    The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway. Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR). A Design Verification Status Questionnaire, Table 1, is included which addresses Corrective Action SNF-EG-MA-EG-20000060, Item No.9 (Miller 2000).

  2. M&V Guidelines: Measurement and Verification for Federal Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0) M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0) ...

  3. A golden anniversary for space-based treaty verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A golden anniversary for space-based treaty verification Fifty years ago this month, LANL ... Los Alamos is commemorating 50 years of space-based arms treaty verification efforts this ...

  4. M&V Guidelines: Measurement and Verification for Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    You are here Home M&V Guidelines: Measurement and Verification for Performance-Based Contracts (Version 4.0) M&V Guidelines: Measurement and Verification for Performance-Based ...

  5. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2

    SciTech Connect (OSTI)

    PARSONS, J.E.

    2000-07-15

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  6. MACCS2 development and verification efforts

    SciTech Connect (OSTI)

    Young, M.; Chanin, D.

    1997-03-01

    MACCS2 represents a major enhancement of the capabilities of its predecessor MACCS, the MELCOR Accident Consequence Code System. MACCS, released in 1987, was developed to estimate the potential impacts to the surrounding public of severe accidents at nuclear power plants. The principal phenomena considered in MACCS/MACCS2 are atmospheric transport and deposition under time-variant meteorology, short-term and long-term mitigative actions and exposure pathways, deterministic and stochastic health effects, and economic costs. MACCS2 was developed as a general-purpose analytical tool applicable to diverse reactor and nonreactor facilities. The MACCS2 package includes three primary enhancements: (1) a more flexible emergency response model, (2) an expanded library of radionuclides, and (3) a semidynamic food-chain model. In addition, errors that had been identified in MACCS version1.5.11.1 were corrected, including an error that prevented the code from providing intermediate-phase results. MACCS2 version 1.10 beta test was released to the beta-test group in May, 1995. In addition, the University of New Mexico (UNM) has completed an independent verification study of the code package. Since the beta-test release of MACCS2 version 1.10, a number of minor errors have been identified and corrected, and a number of enhancements have been added to the code package. The code enhancements added since the beta-test release of version 1.10 include: (1) an option to allow the user to input the {sigma}{sub y} and {sigma}{sub z} plume expansion parameters in a table-lookup form for incremental downwind distances, (2) an option to define different initial dimensions for up to four segments of a release, (3) an enhancement to the COMIDA2 food-chain model preprocessor to allow the user to supply externally calculated tables of tritium food-chain dose per unit deposition on farmland to support analyses of tritium releases, and (4) the capability to calculate direction-dependent doses.

  7. AHAM Letter Acknowledging DOE Letter on Verification Program | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Letter Acknowledging DOE Letter on Verification Program AHAM Letter Acknowledging DOE Letter on Verification Program This document is a response to the letter dated April 26, 2013, in which DOE adopted a new policy regarding DOE ENERGY STAR verification testing of models that are part of the AHAM verification program for clothes washers, dishwashers, and residential refrigerator/freezers. aham_response_doe_letter.pdf (80.05 KB) More Documents & Publications This letter is to

  8. Additional Verification Bodies Now Available for SEP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Verification Bodies Now Available for SEP Additional Verification Bodies Now Available for SEP May 14, 2014 - 11:40am Addthis Superior Energy Performance (SEP) recognizes industrial facilities that demonstrate energy management excellence and sustained energy savings. Third-party verification using an ANSI-ANAB Accredited Verification Body offers robust, independent confirmation of a facility's conformance to ISO 50001 and improved energy performance-providing accurate energy numbers

  9. Example Measurement and Verification Plan for an ESPC Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report features a comprehensive measurement and verification (M&V) plan for a fictitious energy savings performance contract (ESPC) project.

  10. Supplement No. 2 to the FUSRAP Summary Protocol - Verification and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certification Protocol | Department of Energy 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol (November 1985, Rev. 1) Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol (November 1985, Rev. 1) (1.14 MB) More Documents & Publications Supplement

  11. Invited book review for AIAA Journal of verification of computer...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 99 GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; COMPUTER CODES; VERIFICATION; SANDIA ...

  12. Battery Technology Life Verification Test Manual Revision 1

    SciTech Connect (OSTI)

    Jon P. Christophersen

    2012-12-01

    The purpose of this Technology Life Verification Test (TLVT) Manual is to help guide developers in their effort to successfully commercialize advanced energy storage devices such as battery and ultracapacitor technologies. The experimental design and data analysis discussed herein are focused on automotive applications based on the United States Advanced Battery Consortium (USABC) electric vehicle, hybrid electric vehicle, and plug-in hybrid electric vehicle (EV, HEV, and PHEV, respectively) performance targets. However, the methodology can be equally applied to other applications as well. This manual supersedes the February 2005 version of the TLVT Manual (Reference 1). It includes criteria for statistically-based life test matrix designs as well as requirements for test data analysis and reporting. Calendar life modeling and estimation techniques, including a user’s guide to the corresponding software tool is now provided in the Battery Life Estimator (BLE) Manual (Reference 2).

  13. Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  14. Nuclear Verification | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Control Nuclear Verification Challenge: Maintain the U.S. ability to monitor and verify nuclear reduction agreements and detect violations of treaties and other nuclear nonproliferation commitments. Solution: Develop and deploy measures to ensure verifiable compliance with treaties and other international agreements, implement regimes to reduce nuclear weapons, and detect and dismantle undeclared nuclear programs. Specific subprogram activities include: Implementing current and developing future

  15. treaty verification | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    treaty verification Global Material Security The mission of the Office of Global Material Security (GMS) is to help partner countries secure and account for nuclear weapons, weapons-useable nuclear and radiological materials, as well as to build capacity to deter, detect and interdict the illicit trafficking of such materials. GMS achieves

  16. RELAP-7 SOFTWARE VERIFICATION AND VALIDATION PLAN

    SciTech Connect (OSTI)

    Smith, Curtis L; Choi, Yong-Joon; Zou, Ling

    2014-09-01

    This INL plan comprehensively describes the software for RELAP-7 and documents the software, interface, and software design requirements for the application. The plan also describes the testing-based software verification and validation (SV&V) process—a set of specially designed software models used to test RELAP-7.

  17. The AdaptiV Approach to Verification of Adaptive Systems

    SciTech Connect (OSTI)

    Rouff, Christopher; Buskens, Richard; Pullum, Laura L; Cui, Xiaohui; Hinchey, Mike

    2012-01-01

    Adaptive systems are critical for future space and other unmanned and intelligent systems. Verification of these systems is also critical for their use in systems with potential harm to human life or with large financial investments. Due to their nondeterministic nature and extremely large state space, current methods for verification of software systems are not adequate to provide a high level of assurance. The combination of stabilization science, high performance computing simulations, compositional verification and traditional verification techniques, plus operational monitors, provides a complete approach to verification and deployment of adaptive systems that has not been used before. This paper gives an overview of this approach.

  18. CRO candidates announced, interviews underway | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CRO candidates announced, interviews underway The search for the next Ames Laboratory Chief Research Officer is heading into the final stretch. The search committee has reviewed 36 applications, conducted phone interviews with eight, and narrowed the applicant list to five candidates, who are interviewing on site over the next few weeks. The five candidates are: Olle Heinonen, Argonne National Laboratory - Aug. 25 Dimitri Argyriou, European Spallation Source - Aug. 29 Eric Schwegler, Lawrence

  19. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

  20. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-09-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

  1. Microsoft Word - Advanced Solution Verification of CFD Solutions for LES of GTRF_Rider_August23.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    VUQ.VVDA.P4.03 Jim Stewart SNL Completed: 8/31/2012 CASL-U-2012-0132-000 Advanced Solution Verification of CFD Solutions for LES o f R elevance t o GTRF Estimates. William J. Rider and James R. Kamm Sandia N ational L aboratories Albuquerque, NM 87185 August 31, 2012 SAND 2 012---7199P Summary The purpose of this work is to d emonstrate advanced solution verification (i.e., numerical error estimation) techniques on computational fluid dynamics simulations of interest to CASL. The specific case

  2. News Media invited to interview JLab summer, science enrichment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JLab summer, science enrichment program participants; cover closing Poster Session 2003 ... News Media invited to interview JLab summer, science enrichment program participants; ...

  3. News Media invited to interview Jefferson Lab summer science...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Media invited to interview Jefferson Lab summer science enrichment program ... of Jefferson Lab's summer, science enrichment programs as they share their summer ...

  4. News Media invited to interview Jefferson Lab summer science...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Media invited to interview Jefferson Lab summer science enrichment program ... of Jefferson Lab's summer science enrichment programs as they share their summer ...

  5. Purpose

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to achieve the Laboratory mission and strategic objectives. OHAP Outcomes As part of the Strategic Planning and Goal Setting process, laboratory management annually reviews...

  6. Purpose

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Magic Arcs - The bottom arc always looks bigger than the top one, yet they are actually the same size. You just can't trust your senses. The secret is that the longer edge of the ...

  7. Systems Approach to Arms Control Verification

    SciTech Connect (OSTI)

    Allen, K; Neimeyer, I; Listner, C; Stein, G; Chen, C; Dreicer, M

    2015-05-15

    Using the decades of experience of developing concepts and technologies for verifying bilateral and multilateral arms control agreements, a broad conceptual systems approach is being developed that takes into account varying levels of information and risk. The IAEA has already demonstrated the applicability of a systems approach by implementing safeguards at the State level, with acquisition path analysis as the key element. In order to test whether such an approach could also be implemented for arms control verification, an exercise was conducted in November 2014 at the JRC ITU Ispra. Based on the scenario of a hypothetical treaty between two model nuclear weapons states aimed at capping their nuclear arsenals at existing levels, the goal of this exercise was to explore how to use acquisition path analysis in an arms control context. Our contribution will present the scenario, objectives and results of this exercise, and attempt to define future workshops aimed at further developing verification measures that will deter or detect treaty violations.

  8. NGSI: IAEA Verification of UF6 Cylinders

    SciTech Connect (OSTI)

    Curtis, Michael M.

    2012-06-05

    The International Atomic Energy Agency (IAEA) is often ignorant of the location of declared, uranium hexafluoride (UF6) cylinders following verification, because cylinders are not typically tracked onsite or off. This paper will assess various methods the IAEA uses to verify cylinder gross defects, and how the task could be ameliorated through the use of improved identification and monitoring. The assessment will be restricted to current verification methods together with one that has been applied on a trial basis—short-notice random inspections coupled with mailbox declarations. This paper is part of the NNSA Office of Nonproliferation and International Security’s Next Generation Safeguards Initiative (NGSI) program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF6 cylinders.

  9. Mapping {sup 15}O Production Rate for Proton Therapy Verification

    SciTech Connect (OSTI)

    Grogg, Kira; Alpert, Nathaniel M.; Zhu, Xuping; Min, Chul Hee; Testa, Mauro; Winey, Brian; Normandin, Marc D.; Shih, Helen A.; Paganetti, Harald; Bortfeld, Thomas; El Fakhri, Georges

    2015-06-01

    Purpose: This work was a proof-of-principle study for the evaluation of oxygen-15 ({sup 15}O) production as an imaging target through the use of positron emission tomography (PET), to improve verification of proton treatment plans and to study the effects of perfusion. Methods and Materials: Dynamic PET measurements of irradiation-produced isotopes were made for a phantom and rabbit thigh muscles. The rabbit muscle was irradiated and imaged under both live and dead conditions. A differential equation was fitted to phantom and in vivo data, yielding estimates of {sup 15}O production and clearance rates, which were compared to live versus dead rates for the rabbit and to Monte Carlo predictions. Results: PET clearance rates agreed with decay constants of the dominant radionuclide species in 3 different phantom materials. In 2 oxygen-rich materials, the ratio of {sup 15}O production rates agreed with the expected ratio. In the dead rabbit thighs, the dynamic PET concentration histories were accurately described using {sup 15}O decay constant, whereas the live thigh activity decayed faster. Most importantly, the {sup 15}O production rates agreed within 2% (P>.5) between conditions. Conclusions: We developed a new method for quantitative measurement of {sup 15}O production and clearance rates in the period immediately following proton therapy. Measurements in the phantom and rabbits were well described in terms of {sup 15}O production and clearance rates, plus a correction for other isotopes. These proof-of-principle results support the feasibility of detailed verification of proton therapy treatment delivery. In addition, {sup 15}O clearance rates may be useful in monitoring permeability changes due to therapy.

  10. DOE Zero Energy Ready Home Verification Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Zero Energy Ready Home Verification Summary DRAFT REM/Rate - Residential Energy Analysis and Rating Software v14.5.1 This information does not constitute any warranty of energy cost or savings. © 1985-2014 Architectural Energy Corporation, Boulder, Colorado. Projected Rating: Based on Plans - Field Confirmation Required. Energy Performance House Type DOE Zero Energy Ready Home Builder Partner ID# Single-family detached 12345 Year built Square footage of Conditioned Space including Basement 2013

  11. TWRS system drawings and field verification

    SciTech Connect (OSTI)

    Shepard, D.G.

    1995-04-11

    The Configuration Management Program combines the TWRS Labeling and O and M drawing and drawing verification programs. The combined program will produce system drawings for systems that are normally operated or have maintenance performed on the system, label individual pieces of equipment for proper identification, even if system drawings are not warranted, and perform verification of drawings that are identified as essential in Tank Farm Essential Drawing Plans. During fiscal year 1994, work was begun to label Tank Farm components and provide user friendly system based drawings for Tank Waste Remediation System (TWRS) operations and maintenance. During the first half of fiscal 1995, the field verification program continued to convert TWRS drawings into CAD format and verify the accuracy based on visual inspections. During the remainder of fiscal year 1995 these efforts will be combined into a single program providing system based drawings and field verification of TWRS equipment and facilities. This combined program for TWRS will include all active systems for tank farms. Operations will determine the extent of drawing and labeling requirements for single shell tanks, i.e. the electrical distribution, HVAC, leak detection, and the radiation monitoring system. The tasks required to meet these objectives, include the following: identify system boundaries or scope for drawing being verified; label equipment/components in the process systems with a unique Equipment Identification Number (EIN) per the TWRS Data Standard; develop system drawings that are coordinated by ``smart`` drawing numbers and/or drawing references as identified on H-14-020000; develop a Master Equipment List (MEL) multi-user data base application which will contain key information about equipment identified in the field; and field verify and release TWRS Operation and Maintenance (O and M) drawings.

  12. Survey of Existing Tools for Formal Verification.

    SciTech Connect (OSTI)

    Punnoose, Ratish J.; Armstrong, Robert C.; Wong, Matthew H.; Jackson, Mayo

    2014-12-01

    Formal methods have come into wide use because of their effectiveness in verifying %22safety and security%22 requirements of digital systems; a set of requirements for which testing is mostly ineffective. Formal methods are routinely used in the design and verification of high-consequence digital systems in industry. This report outlines our work in assessing the capabilities of commercial and open source formal tools and the ways in which they can be leveraged in digital design workflows.

  13. River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.

  14. Verification of EPA's ''Preliminary Remediation Goals for radionuclides'' (PRG) electronic calculator

    SciTech Connect (OSTI)

    Jannik, Tim; Stagich, Brooke

    2015-08-28

    The U.S. Environmental Protection Agency (EPA) requested an external, independent verification study of their updated “Preliminary Remediation Goals for Radionuclides” (PRG) electronic calculator. The calculator provides PRGs for radionuclides that are used as a screening tool at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. These risk-based PRGs establish concentration limits under specific exposure scenarios. The purpose of this verification study is to determine that the calculator has no inherit numerical problems with obtaining solutions as well as to ensure that the equations are programmed correctly. There are 167 equations used in the calculator. To verify the calculator, all equations for each of seven receptor types (resident, construction worker, outdoor and indoor worker, recreator, farmer, and composite worker) were hand calculated using the default parameters. The same four radionuclides (Am-241, Co-60, H-3, and Pu-238) were used for each calculation for consistency throughout.

  15. Technical safety requirements control level verification

    SciTech Connect (OSTI)

    STEWART, J.L.

    1999-05-21

    A Technical Safety Requirement (TSR) control level verification process was developed for the Tank Waste Remediation System (TWRS) TSRs at the Hanford Site in Richland, WA, at the direction of the US. Department of Energy, Richland Operations Office (RL). The objective of the effort was to develop a process to ensure that the TWRS TSR controls are designated and managed at the appropriate levels as Safety Limits (SLs), Limiting Control Settings (LCSs), Limiting Conditions for Operation (LCOs), Administrative Controls (ACs), or Design Features. The TSR control level verification process was developed and implemented by a team of contractor personnel with the participation of Fluor Daniel Hanford, Inc. (FDH), the Project Hanford Management Contract (PHMC) integrating contractor, and RL representatives. The team was composed of individuals with the following experience base: nuclear safety analysis; licensing; nuclear industry and DOE-complex TSR preparation/review experience; tank farm operations; FDH policy and compliance; and RL-TWRS oversight. Each TSR control level designation was completed utilizing TSR control logic diagrams and TSR criteria checklists based on DOE Orders, Standards, Contractor TSR policy, and other guidance. The control logic diagrams and criteria checklists were reviewed and modified by team members during team meetings. The TSR control level verification process was used to systematically evaluate 12 LCOs, 22 AC programs, and approximately 100 program key elements identified in the TWRS TSR document. The verification of each TSR control required a team consensus. Based on the results of the process, refinements were identified and the TWRS TSRs were modified as appropriate. A final report documenting key assumptions and the control level designation for each TSR control was prepared and is maintained on file for future reference. The results of the process were used as a reference in the RL review of the final TWRS TSRs and control suite. RL

  16. SHINE Vacuum Pump Test Verification

    SciTech Connect (OSTI)

    Morgan, Gregg A; Peters, Brent

    2013-09-30

    Normetex pumps used world-wide for tritium service are no longer available. DOE and other researchers worldwide have spent significant funds characterizing this pump. Identification of alternate pumps is required for performance and compatibility with tritium gas. Many of the pumps that could be used to meet the functional performance requirements (e.g. pressure and flow conditions) of the Normetex pump have features that include the use of polymers or oils and greases that are not directly compatible with tritium service. This study assembles a test system to determine the flow characteristics for candidate alternate pumps. These tests are critical to the movement of tritium through the SHINE Tritium Purification System (TPS). The purpose of the pump testing is two-fold: (1) obtain baseline vacuum pump characteristics for an alternate (i.e. ''Normetex replacement'') pump intended for use in tritium service; and (2) verify that low pressure hydrogen gas can be transported over distances up to 300 feet by the candidate pumps. Flow rates and nominal system pressures have been identified for the SHINE Mo-99 production process Tritium Purification System (TPS). To minimize the line sizes for the transfer of low pressure tritium from the Neutron Driver Accelerator System (NDAS) to the primary processing systems in the TPS, a ''booster'' pump has been located near the accelerator in the design. A series of pump tests were performed at various configurations using hydrogen gas (no tritium) to ensure that this concept is practical and maintains adequate flow rates and required pressures. This report summarizes the results of the tests that have been performed using various pump configurations. The current design of the Tritium Purification System requires the ''booster'' pump to discharge to or to be backed by another vacuum pump. Since Normetex pumps are no longer manufactured, a commercially available Edwards scroll pump will be used to back the booster pump. In this

  17. Thoughts on Verification of Nuclear Disarmament

    SciTech Connect (OSTI)

    Dunlop, W H

    2007-09-26

    It is my pleasure to be here to day to participate in this Conference. My thanks to the organizers for preparing such an interesting agenda on a very difficult topic. My effort in preparing my presentation was performed under the auspices of the U.S. Department of Energy by University of California, Lawrence Livermore National Laboratory under Contract W-7405-Eng-48. And as many of you know Lawrence Livermore National Laboratory is now, as of Oct 1st, under contract to the Lawrence Livermore National Security LLC. There has been a long history of how to view verification of arms control agreements. The basis for verification during the days of SALT was that verification would be based on each country's national technical means. For treaties dealing with strategic missiles this worked well as the individual items subject to verification were of such a size that they were visible by the National Technical Means available at the time. And it was felt that the counting of missiles and launchers could be verified by our National Technical Means. For nuclear testing treaties the use of seismic measurements developed into a capability that was reasonably robust for all but the smallest of nuclear tests. However, once we had the Threshold Test Ban Treaty, there was a significant problem in that the fidelity of the measurements were not sufficient to determine if a test was slightly above the 150 kt limit or slightly below the 150 kt limit. This led some in the US to believe that the Soviet Union was not living up to the TTBT agreement. An on-site verification protocol was negotiated in 1988 and 1989 that allowed the US to make hydrodynamic yield measurements on Soviet tests above 50 kt yield and regional seismic measurements on all tests above 35 kt of yield; and the Soviets to make the same type of measurements on US tests to ensure that they were not over 150 kt. These on-site measurements were considered reasonably intrusive. Again the measurement capability was not

  18. Recommendation 165: Recommendation on Conducting Future Verifications of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup | Department of Energy 165: Recommendation on Conducting Future Verifications of Cleanup Recommendation 165: Recommendation on Conducting Future Verifications of Cleanup The ORSSAB commends the DOE policy of obtaining independent verification of DOE Environmental Management-related activities. Recommendation 165 (96.84 KB) DOE response to recommendation 165 (1.39 MB) More Documents & Publications OREM Accomplishments Timeline ORSSAB Meeting - April 2013 Recommendation 170:

  19. Reviewing Measurement and Verification Plans for Federal ESPC Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reviewing Measurement and Verification Plans for Federal ESPC Projects Reviewing Measurement and Verification Plans for Federal ESPC Projects Document provides a framework for implementing uniform and consistent reviews of measurement and verification plans for federal energy savings performance contract (ESPC) projects. Download the review framework. (184.56 KB) More Documents & Publications Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

  20. Evaluation, Measurement, and Verification of Energy Data | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Evaluation, Measurement, and Verification of Energy Data Evaluation, Measurement, and Verification of Energy Data Evaluation, measurement, and verification (EM&V) is the collection of methods and processes used to assess the performance of energy efficiency activities so planned results can be achieved with greater certainty and future activities can be more effective. The main objectives of an EM&V process are to assess the performance of an energy efficiency program or

  1. CARB Verification of Catalyzed Diesel Particulate Filters for Emergency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generator Sets | Department of Energy CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets CARB Verification of Catalyzed Diesel Particulate Filters for Emergency Generator Sets 2005 Diesel Engine Emissions Reduction (DEER) Conference Presentations and Posters 2005_deer_huang.pdf (272.67 KB) More Documents & Publications Development and Applications of Catalyzed Diesel Particulate Filter California ARB Verification Testing of the CBSTM Soot Filter for

  2. Measurement and Verification of Low Income Energy Efficiency...

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentmeasurement-and-verification-low-inco Language: English Policies: "Regulations,Financial Incentives" is not in the list of possible...

  3. ON THE EXPERIMENTAL VERIFICATION AND DETERMINATION OF PARAMETERS...

    Office of Scientific and Technical Information (OSTI)

    Title: ON THE EXPERIMENTAL VERIFICATION AND DETERMINATION OF PARAMETERS OF STOPPING-POWER THEORY Authors: Turner, J. E. Publication Date: 1964-01-01 OSTI Identifier: 4887408 Report ...

  4. NEMVP: North American energy measurement and verification protocol

    SciTech Connect (OSTI)

    1996-03-01

    This measurement and verification protocol discusses procedures that,when implemented, allow buyers, sellers, and financiers of energy projects to quantify energy conservation measure performance and savings.

  5. Verification of the Time Evolution of Cosmological Simulations...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Verification of the Time Evolution of Cosmological Simulations via Hypothesis-Driven Comparative and Quantitative Visualization Citation Details In-Document Search...

  6. Design, Installation, and Field Verification of Integrated Active...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cogeneration Package, 2008 Design, Installation, and Field Verification of Integrated Active Desiccant Hybrid Rooftop Systems Combined with a Natural Gas Driven Cogeneration ...

  7. DOE Verification Testing in Support of ENERGY STAR, April 22...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program Comment submitted by the North American Association of Food Equipment ...

  8. CHARPY IMPACT TEST RESULTS ON FIVE MAERIALS AND NIST VERIFICATION...

    Office of Scientific and Technical Information (OSTI)

    CHARPY IMPACT TEST RESULTS ON FIVE MAERIALS AND NIST VERIFICATION SPECIMENS USING ... Randy K, Nanstad' and Mikbail A. Sokolov' cHARPY IMPACT' TEST RESULTS ON FIVE MATERIALS ...

  9. Measurement and Verification for Federal Energy Savings Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Measurement and verification (M&V) activities help agencies confirm that legally and ... When done correctly, M&V: Appropriately allocates risks Reduces uncertainty of savings ...

  10. Measurement and Verification of Energy Savings and Performance...

    Office of Environmental Management (EM)

    Savings and Performance from Advanced Lighting Controls Measurement and Verification of Energy Savings and Performance from Advanced Lighting Controls This document provides a ...

  11. Verification of the Time Evolution of Cosmological Simulations...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSICS; ACCURACY; ALGORITHMS; COSMOLOGY; SIMULATION; VERIFICATION Word ...

  12. NNSA Begins New Campaign of Verification Experiments at Nevada...

    National Nuclear Security Administration (NNSA)

    NNSA Begins New Campaign of Verification Experiments at Nevada National Security Site May ... are being conducted at NNSA's Nevada National Security Site (NNSS) and will ...

  13. Energy Star Lighting Verification Program (Program for the Evaluation...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Energy Star Lighting Verification Program (Program for the Evaluation and Analysis of Residential Lighting) Citation Details In-Document Search Title: Energy Star ...

  14. Advanced Waste Management Now Available as Accredited SEP Verification...

    Office of Environmental Management (EM)

    Technical Assistance Superior Energy Performance Advanced Waste Management Now Available as Accredited SEP Verification Body Advanced Waste Management Now Available as ...

  15. Measurement and Verification for Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Measurement and verification (M&V) activities help agencies confirm that legally and contractually required savings guarantees are met in federal energy savings performance contracts (ESPCs).

  16. Measurement and Verification Plan and Savings Calculations Methods...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Methods Outline (IDIQ Attachment J-8) Measurement and Verification Plan and Savings Calculations Methods Outline (IDIQ Attachment J-8) Document outlines measurement and ...

  17. Solar Industry At Work: Video Interview with Alta Devices' Laila...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos June 6, 2012 - 12:07pm Addthis Laila Mattos talks about her work life at Alta Devices -- a solar company ...

  18. Guidance to Completing the Self-Directed RBSM Interview Form

    Broader source: Energy.gov [DOE]

    This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review...

  19. Segment of Smithsonian Video history interview - December 1987

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The interviewees were George M. Banic, Jr., John M. Googin, Chris P. Keim, Clarence Larson and Robert S. Livingston. Before looking at the specific interviews let's learn a bit...

  20. News Media invited to interview JLab summer, science enrichment program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    participants; cover closing Poster Session | Jefferson Lab JLab summer, science enrichment program participants; cover closing Poster Session 2003 Education Poster Session 2003 Education Poster Session News Media invited to interview JLab summer, science enrichment program participants; cover closing Poster Session July 28, 2004 Newport News, VA. - News Media representatives are invited to interview, photograph or film participants of Jefferson Lab's summer, science enrichment programs as

  1. News Media invited to interview Jefferson Lab summer science enrichment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    program participants; cover closing Poster Session | Jefferson Lab SULI 2004 participant Rachel Black, SULI 2004 participant, talks to Alan Gavalya (far left), Physics Division, and Jim Clark, Accelerator Division, about her work with JLab's Detector Group. Photo: Greg Adams, JLab Media Advisory: News Media invited to interview Jefferson Lab summer science enrichment program participants; cover closing Poster Session July 29, 2005 News Media representatives are invited to interview,

  2. News Media invited to interview Jefferson Lab summer science enrichment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    program participants; cover closing Poster Session | Jefferson Lab News Media invited to interview Jefferson Lab summer science enrichment program participants; cover closing Poster Session August 1, 2007 News Media representatives are invited to interview, photograph and/or film participants of Jefferson Lab's summer science enrichment programs as they share their summer experiences and projects with JLab staff during a Poster Session scheduled for Friday, Aug. 3, from 11:30 a.m.-1:30 p.m.

  3. Accelerating functional verification of an integrated circuit

    SciTech Connect (OSTI)

    Deindl, Michael; Ruedinger, Jeffrey Joseph; Zoellin, Christian G.

    2015-10-27

    Illustrative embodiments include a method, system, and computer program product for accelerating functional verification in simulation testing of an integrated circuit (IC). Using a processor and a memory, a serial operation is replaced with a direct register access operation, wherein the serial operation is configured to perform bit shifting operation using a register in a simulation of the IC. The serial operation is blocked from manipulating the register in the simulation of the IC. Using the register in the simulation of the IC, the direct register access operation is performed in place of the serial operation.

  4. Accelerating functional verification of an integrated circuit

    DOE Patents [OSTI]

    Deindl, Michael; Ruedinger, Jeffrey Joseph; Zoellin, Christian G

    2015-11-05

    Illustrative embodiments include a method, system, and computer program product for accelerating functional verification in simulation testing of an integrated circuit (IC). Using a processor and a memory, a serial operation is replaced with a direct register access operation, wherein the serial operation is configured to perform bit shifting operation using a register in a simulation of the IC. The serial operation is blocked from manipulating the register in the simulation of the IC. Using the register in the simulation of the IC, the direct register access operation is performed in place of the serial operation.

  5. SQA_CodeVerification_Survey_FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Survey o f S oftware Q uality Assurance a nd Code Verification Practices i n CASL Michael P ernice Idaho N ational L aboratory Matt S ieger Oak R idge N ational Laboratory March 26, 2 013 INL/EXT-13-28675 CASL-U-2013-0079-000 CASL-U-2013-0079-000 DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal

  6. A method for online verification of adapted fields using an independent dose monitor

    SciTech Connect (OSTI)

    Chang Jina; Norrlinger, Bernhard D.; Heaton, Robert K.; Jaffray, David A.; Cho, Young-Bin; Islam, Mohammad K.; Mahon, Robert

    2013-07-15

    Purpose: Clinical implementation of online adaptive radiotherapy requires generation of modified fields and a method of dosimetric verification in a short time. We present a method of treatment field modification to account for patient setup error, and an online method of verification using an independent monitoring system.Methods: The fields are modified by translating each multileaf collimator (MLC) defined aperture in the direction of the patient setup error, and magnifying to account for distance variation to the marked isocentre. A modified version of a previously reported online beam monitoring system, the integral quality monitoring (IQM) system, was investigated for validation of adapted fields. The system consists of a large area ion-chamber with a spatial gradient in electrode separation to provide a spatially sensitive signal for each beam segment, mounted below the MLC, and a calculation algorithm to predict the signal. IMRT plans of ten prostate patients have been modified in response to six randomly chosen setup errors in three orthogonal directions.Results: A total of approximately 49 beams for the modified fields were verified by the IQM system, of which 97% of measured IQM signal agree with the predicted value to within 2%.Conclusions: The modified IQM system was found to be suitable for online verification of adapted treatment fields.

  7. SPR Hydrostatic Column Model Verification and Validation.

    SciTech Connect (OSTI)

    Bettin, Giorgia; Lord, David; Rudeen, David Keith

    2015-10-01

    A Hydrostatic Column Model (HCM) was developed to help differentiate between normal "tight" well behavior and small-leak behavior under nitrogen for testing the pressure integrity of crude oil storage wells at the U.S. Strategic Petroleum Reserve. This effort was motivated by steady, yet distinct, pressure behavior of a series of Big Hill caverns that have been placed under nitrogen for extended period of time. This report describes the HCM model, its functional requirements, the model structure and the verification and validation process. Different modes of operation are also described, which illustrate how the software can be used to model extended nitrogen monitoring and Mechanical Integrity Tests by predicting wellhead pressures along with nitrogen interface movements. Model verification has shown that the program runs correctly and it is implemented as intended. The cavern BH101 long term nitrogen test was used to validate the model which showed very good agreement with measured data. This supports the claim that the model is, in fact, capturing the relevant physical phenomena and can be used to make accurate predictions of both wellhead pressure and interface movements.

  8. Verification and validation for induction heating

    SciTech Connect (OSTI)

    Lam, Kin [Los Alamos National Laboratory; Tippetts, Trevor B [Los Alamos National Laboratory; Allen, David W [NON LANL

    2008-01-01

    Truchas is a software package being developed at LANL within the Telluride project for predicting the complex physical processes in metal alloy casting. The software was designed to be massively parallel, multi-material, multi-physics, and to run on 3D, fully unstructured meshes. This work describes a Verification and Validation assessment of Truchas for simulating the induction heating phase of a casting process. We used existing data from a simple experiment involving the induction heating of a graphite cylinder, as graphite is a common material used for mold assemblies. Because we do not have complete knowledge of all the conditions and properties in this experiment (as is the case in many other experiments), we performed a parameter sensitivity study, modeled the uncertainties of the most sensitive parameters, and quantified how these uncertainties propagate to the Truchas output response. A verification analysis produced estimates of the numerical error of the Truchas solution to our computational model. The outputs from Truchas runs with randomly sampled parameter values were used for the validation study.

  9. DESIGN INFORMATION VERIFICATION FOR NUCLEAR SAFEGUARDS

    SciTech Connect (OSTI)

    Robert S. Bean; Richard R. M. Metcalf; Phillip C. Durst

    2009-07-01

    A critical aspect of international safeguards activities performed by the International Atomic Energy Agency (IAEA) is the verification that facility design and construction (including upgrades and modifications) do not create opportunities for nuclear proliferation. These Design Information Verification activities require that IAEA inspectors compare current and past information about the facility to verify the operator’s declaration of proper use. The actual practice of DIV presents challenges to the inspectors due to the large amount of data generated, concerns about sensitive or proprietary data, the overall complexity of the facility, and the effort required to extract just the safeguards relevant information. Planned and anticipated facilities will (especially in the case of reprocessing plants) be ever larger and increasingly complex, thus exacerbating the challenges. This paper reports the results of a workshop held at the Idaho National Laboratory in March 2009, which considered technologies and methods to address these challenges. The use of 3D Laser Range Finding, Outdoor Visualization System, Gamma-LIDAR, and virtual facility modeling, as well as methods to handle the facility data issues (quantity, sensitivity, and accessibility and portability for the inspector) were presented. The workshop attendees drew conclusions about the use of these techniques with respect to successfully employing them in an operating environment, using a Fuel Conditioning Facility walk-through as a baseline for discussion.

  10. Nonintrusive verification attributes for excess fissile materials

    SciTech Connect (OSTI)

    Nicholas, N.J.; Eccleston, G.W.; Fearey, B.L.

    1997-10-01

    Under US initiatives, over two hundred metric tons of fissile materials have been declared to be excess to national defense needs. These excess materials are in both classified and unclassified forms. The US has expressed the intent to place these materials under international inspections as soon as practicable. To support these commitments, members of the US technical community are examining a variety of nonintrusive approaches (i.e., those that would not reveal classified or sensitive information) for verification of a range of potential declarations for these classified and unclassified materials. The most troublesome and potentially difficult issues involve approaches for international inspection of classified materials. The primary focus of the work to date has been on the measurement of signatures of relevant materials attributes (e.g., element, identification number, isotopic ratios, etc.), especially those related to classified materials and items. The authors are examining potential attributes and related measurement technologies in the context of possible verification approaches. The paper will discuss the current status of these activities, including their development, assessment, and benchmarking status.

  11. Advanced Waste Management Now Available as Accredited SEP Verification Body

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is pleased to announce that Advanced Waste Management Systems Inc. (AWM) is now a fully accredited Verification Body for Superior Energy Performance™ (SEP). This ANSI-ANAB accreditation enables AWM to provide third-party verification for industrial facilities that wish to demonstrate energy management excellence and sustained energy savings to earn SEP certification.

  12. Spent Nuclear Fuel (SNF) Multi Canister Overpack (MCO) Design Verification Summary

    SciTech Connect (OSTI)

    GOLDMANN, L.H.

    1999-11-30

    This document summarizes the design verification activities performed on the Multi-canister Overpack design and documents verification plans for design changes during fabrication.

  13. Approaches to verification of two-dimensional water quality models

    SciTech Connect (OSTI)

    Butkus, S.R. . Water Quality Dept.)

    1990-11-01

    The verification of a water quality model is the one procedure most needed by decision making evaluating a model predictions, but is often not adequate or done at all. The results of a properly conducted verification provide the decision makers with an estimate of the uncertainty associated with model predictions. Several statistical tests are available for quantifying of the performance of a model. Six methods of verification were evaluated using an application of the BETTER two-dimensional water quality model for Chickamauga reservoir. Model predictions for ten state variables were compared to observed conditions from 1989. Spatial distributions of the verification measures showed the model predictions were generally adequate, except at a few specific locations in the reservoir. The most useful statistics were the mean standard error of the residuals. Quantifiable measures of model performance should be calculated during calibration and verification of future applications of the BETTER model. 25 refs., 5 figs., 7 tabs.

  14. Technology verification phase. Dynamic isotope power system. Final report

    SciTech Connect (OSTI)

    Halsey, D.G.

    1982-03-10

    The Phase I requirements of the Kilowatt Isotope Power System (KIPS) program were to make a detailed Flight System Conceptual Design (FSCD) for an isotope fueled organic Rankine cycle power system and to build and test a Ground Demonstration System (GDS) which simulated as closely as possible the operational characteristics of the FSCD. The activities and results of Phase II, the Technology Verification Phase, of the program are reported. The objectives of this phase were to increase system efficiency to 18.1% by component development, to demonstrate system reliability by a 5000 h endurance test and to update the flight system design. During Phase II, system performance was improved from 15.1% to 16.6%, an endurance test of 2000 h was performed while the flight design analysis was limited to a study of the General Purpose Heat Source, a study of the regenerator manufacturing technique and analysis of the hardness of the system to a laser threat. It was concluded from these tests that the GDS is basically prototypic of a flight design; all components necessary for satisfactory operation were demonstrated successfully at the system level; over 11,000 total h of operation without any component failure attested to the inherent reliability of this type of system; and some further development is required, specifically in the area of performance. (LCL)

  15. General purpose programmable accelerator board

    DOE Patents [OSTI]

    Robertson, Perry J.; Witzke, Edward L.

    2001-01-01

    A general purpose accelerator board and acceleration method comprising use of: one or more programmable logic devices; a plurality of memory blocks; bus interface for communicating data between the memory blocks and devices external to the board; and dynamic programming capabilities for providing logic to the programmable logic device to be executed on data in the memory blocks.

  16. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

  17. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

  18. Interview DG Prof.B.Gregory by E.Schaerlig

    ScienceCinema (OSTI)

    None

    2011-04-25

    L'interview en français de 21 min. donné en février concerne le démarrage du "SuperCern" et est accompagné par moments de musique- 3 min. de pause, ensuite autre exposé (debut manque) en anglais parlant du CDC programming system avec questions

  19. Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

    Broader source: Energy.gov [DOE]

    Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

  20. Comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program

  1. Energy Savings Performance Contracting-Savings Measurement and Verification Transcript 2-24-2011.doc

    Broader source: Energy.gov [DOE]

    Energy Savings Performance Contracting-Savings Measurement and Verification Transcript 2-24-2011.doc

  2. Comment submitted by Consumers Union regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Consumers Union regarding the Energy Star Verification Testing Program

  3. ENERGY STAR Appliance Verification Testing- Pilot Program Summary Report dated February 3, 2012

    Broader source: Energy.gov [DOE]

    This document is ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012

  4. FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is the FAQ's for the ENERGY STAR Verification Testing Pilot Program dated December 2010

  5. Comment submitted by Traulsen regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Traulsen regarding the Energy Star Verification Testing Program

  6. Comment submitted by Earthjustice regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Earthjustice regarding the Energy Star Verification Testing Program

  7. State and Local Energy Savings Performance Contracting: Savings Measurement and Verification (M&V)

    Office of Energy Efficiency and Renewable Energy (EERE)

    State and Local Energy Savings Performance Contracting: Savings Measurement and Verification (M&V) Webinar.

  8. DOE Workshop Overview and Purpose

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4/13/2016 eere.energy.gov DOE Workshop Overview and Purpose Workshop on Gas Clean-Up for Fuel Cell Applications 3/6/2014, Argonne National Laboratory Dr. Dimitrios Papageorgopoulos Fuel Cells Program Manager Fuel Cell Technologies Office U.S. Department of Energy 2 | Fuel Cell Technologies Office eere.energy.gov Fuel Cells Overview and Benefits The Role of Fuel Cells Key Benefits Very High Efficiency Reduced CO 2 Emissions * 35-50%+ reductions for CHP systems (>80% with biogas) * 55-90%

  9. Charpy impact test results on five materials and NIST verification...

    Office of Scientific and Technical Information (OSTI)

    test results on five materials and NIST verification specimens using instrumented 2-mm and 8-mm strikers Citation Details In-Document Search Title: Charpy impact test results on ...

  10. M&V Guidelines: Measurement and Verification for Federal Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 ... Management Program November 2015 FEMP M&V Guidelines 4.0 i ACKNOWLEDGMENTS ...

  11. System for Analysis of Soil-Structure Interaction (SASSI) Verification...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System for Analysis of Soil-Structure Interaction (SASSI) Verification & Validation (V&V) Problem Set SASSI is the System for Analysis of Soil-Structure Interaction, a computer ...

  12. M&V Guidelines: Measurement and Verification for Federal Energy...

    Energy Savers [EERE]

    and Verification Protocol (IPMVP) Concepts and Options for Determining Energy and Water Savings Volume 1, April 2007. M&V Guidelines 3.0 FEMP ii Contents Section Page Section...

  13. Assessment of Automated Measurement and Verification (M&V) Methods

    SciTech Connect (OSTI)

    Granderson, Jessica; Touzani, Samir; Custodio, Claudine; Sohn, Michael; Fernandes, Samuel; Jump, David

    2015-07-01

    This report documents the application of a general statistical methodology to assess the accuracy of baseline energy models, focusing on its application to Measurement and Verification (M&V) of whole-building energy savings.

  14. SU-E-T-435: Development and Commissioning of a Complete System for In-Vivo Dosimetry and Range Verification in Proton Therapy

    SciTech Connect (OSTI)

    Samuel, D; Testa, M; Park, Y; Schneider, R; Moteabbed, M; Janssens, G; Prieels, D; Orban de Xivry, J; Lu, H; Bentefour, E

    2014-06-01

    Purpose: In-vivo dose and beam range verification in proton therapy could play significant roles in proton treatment validation and improvements. Invivo beam range verification, in particular, could enable new treatment techniques one of which, for example, could be the use of anterior fields for prostate treatment instead of opposed lateral fields as in current practice. We have developed and commissioned an integrated system with hardware, software and workflow protocols, to provide a complete solution, simultaneously for both in-vivo dosimetry and range verification for proton therapy. Methods: The system uses a matrix of diodes, up to 12 in total, but separable into three groups for flexibility in application. A special amplifier was developed to capture extremely small signals from very low proton beam current. The software was developed within iMagX, a general platform for image processing in radiation therapy applications. The range determination exploits the inherent relationship between the internal range modulation clock of the proton therapy system and the radiological depth at the point of measurement. The commissioning of the system, for in-vivo dosimetry and for range verification was separately conducted using anthropomorphic phantom. EBT films and TLDs were used for dose comparisons and range scan of the beam distal fall-off was used as ground truth for range verification. Results: For in-vivo dose measurement, the results were in agreement with TLD and EBT films and were within 3% from treatment planning calculations. For range verification, a precision of 0.5mm is achieved in homogeneous phantoms, and a precision of 2mm for anthropomorphic pelvic phantom, except at points with significant range mixing. Conclusion: We completed the commissioning of our system for in-vivo dosimetry and range verification in proton therapy. The results suggest that the system is ready for clinical trials on patient.

  15. Verification and large deformation analysis using the reproducing kernel particle method

    SciTech Connect (OSTI)

    Beckwith, Frank

    2015-09-01

    The reproducing kernel particle method (RKPM) is a meshless method used to solve general boundary value problems using the principle of virtual work. RKPM corrects the kernel approximation by introducing reproducing conditions which force the method to be complete to arbritrary order polynomials selected by the user. Effort in recent years has led to the implementation of RKPM within the Sierra/SM physics software framework. The purpose of this report is to investigate convergence of RKPM for verification and validation purposes as well as to demonstrate the large deformation capability of RKPM in problems where the finite element method is known to experience difficulty. Results from analyses using RKPM are compared against finite element analysis. A host of issues associated with RKPM are identified and a number of potential improvements are discussed for future work.

  16. Sandia National Laboratories: Advanced Simulation Computing: Verification &

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Validation Verification & Validation high-fidelity simulations The Verification and Validation (V&V) program conducts two major activities at Sandia. The first is to perform assessments and studies that quantify confidence in Advanced Simulation and Computing (ASC) calculation results. The second activity develops and improves V&V and uncertainty quantification methods, metrics, and standards. Assessments This project area conducts studies and assessments for Sandia's engineering

  17. Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sampling | Department of Energy Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation

  18. ENERGY STAR Test Procedures and Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » ENERGY STAR » ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the lead agency in the development and revision of all test procedures for products in the ENERGY STAR® program, including those products that are also subject to DOE's Energy Conservation Standards program. As specifications are updated and new products or metrics are added to the ENERGY STAR program, DOE is

  19. Hanford Site Assessment & Characterization/Verification of Buildings Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Revision 2 Hanford Site Assessment & Characterization/Verification of Buildings Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0342-002, Rev. 2 Hanford Site Wide Assessment and Characterization/Verification of Buildings Procedure Published Date: 09/08/15 Effective Date: 09/25/15 ii CHANGE SUMMARY Rev # Date-Section Changed Change Details 2 10/06/14 - 1.0 Add statement

  20. Automated Testing Instrument for Verification of Complex Computational

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Systems | Princeton Plasma Physics Lab Automated Testing Instrument for Verification of Complex Computational Systems Verifying the functionality and proper operation of both hardware and software of complex, low, medium and high speed, Real-Time Instrumentation, Acquisition, Control and Protection systems is typically time consuming and costly. When these systems are expanded, modified, enhanced with new features or software 'bugs' corrected, re-verification of correct operation must be

  1. Numerical Verification of Bounce Harmonic Resonances in Neoclassical

    Office of Scientific and Technical Information (OSTI)

    Toroidal Viscosity for Tokamaks (Technical Report) | SciTech Connect Numerical Verification of Bounce Harmonic Resonances in Neoclassical Toroidal Viscosity for Tokamaks Citation Details In-Document Search Title: Numerical Verification of Bounce Harmonic Resonances in Neoclassical Toroidal Viscosity for Tokamaks This Letter presents the rst numerical veri cation for the bounce-harmonic (BH) resonance phenomena of the neoclassical transport in a tokamak perturbed by non-axisymmetric magnetic

  2. Verification and Validation of RADTRAN 5.5.

    SciTech Connect (OSTI)

    Osborn, Douglas.; Weiner, Ruth F.; Mills, George Scott; Hamp, Steve C.

    2005-02-01

    This document contains a description of the verification and validation process used for the RADTRAN 5.5 code. The verification and validation process ensured the proper calculational models and mathematical and numerical methods were used in the RADTRAN 5.5 code for the determination of risk and consequence assessments. The differences between RADTRAN 5 and RADTRAN 5.5 are the addition of tables, an expanded isotope library, and the additional User-Defined meteorological option for accident dispersion. 3

  3. Battery Technology Life Verification Testing and Analysis

    SciTech Connect (OSTI)

    Jon P. Christophersen; Gary L. Hunt; Ira Bloom; Ed Thomas; Vince Battaglia

    2007-12-01

    A critical component to the successful commercialization of batteries for automotive applications is accurate life prediction. The Technology Life Verification Test (TLVT) Manual was developed to project battery life with a high level of statistical confidence within only one or two years of accelerated aging. The validation effort that is presently underway has led to several improvements to the original methodology. For example, a newly developed reference performance test revealed a voltage path dependence effect on resistance for lithium-ion cells. The resistance growth seems to depend on how a target condition is reached (i.e., by a charge or a discharge). Second, the methodology for assessing the level of measurement uncertainty was improved using a propagation of errors in the fundamental measurements to the derived response (e.g., resistance). This new approach provides a more realistic assessment of measurement uncertainty. Third, the methodology for allocating batteries to the test matrix has been improved. The new methodology was developed to assign batteries to the matrix such that the average of each test group would be representative of the overall population. These changes to the TLVT methodology will help to more accurately predict a battery technology’s life capability with a high degree of confidence.

  4. Risk-based technical specifications program: Site interview results

    SciTech Connect (OSTI)

    Andre, G.R.; Baker, A.J. ); Johnson, R.L. )

    1991-08-01

    The Electric Power Research Institute and Pacific Gas and Electric Company are sponsoring a program directed at improving Technical Specifications using risk-based methods. The major objectives of the program are to develop risk-based approaches to improve Technical Specifications and to develop an Interactive Risk Advisor (IRA) prototype. The IRA is envisioned as an interactive system that is available to plant personnel to assist in controlling plant operation. Use of an IRA is viewed as a method to improve plant availability while maintaining or improving plant safety. In support of the program, interviews were conducted at several PWR and BWR plant sites, to elicit opinions and information concerning risk-based approaches to Technical Specifications and IRA requirements. This report presents the results of these interviews, including the functional requirements of an IRA. 2 refs., 6 figs., 2 tabs.

  5. Under the OWASS Spotlight: Interview with Paul Azunre | MIT-Harvard Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Excitonics Under the OWASS Spotlight: Interview with Paul Azunre 9.4.2012

  6. Federal Utility Partnership Working Group Purpose, Policies,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Purpose, Policies, and Operations Draft document (last updated in 2010) discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group. ...

  7. Organics Verification Study for Sinclair and Dyes Inlets, Washington

    SciTech Connect (OSTI)

    Kohn, Nancy P.; Brandenberger, Jill M.; Niewolny, Laurie A.; Johnston, Robert K.

    2006-09-28

    Sinclair and Dyes Inlets near Bremerton, Washington, are on the State of Washington 1998 303(d) list of impaired waters because of fecal coliform contamination in marine water, metals in sediment and fish tissue, and organics in sediment and fish tissue. Because significant cleanup and source control activities have been conducted in the inlets since the data supporting the 1998 303(d) listings were collected, two verification studies were performed to address the 303(d) segments that were listed for metal and organic contaminants in marine sediment. The Metals Verification Study (MVS) was conducted in 2003; the final report, Metals Verification Study for Sinclair and Dyes Inlets, Washington, was published in March 2004 (Kohn et al. 2004). This report describes the Organics Verification Study that was conducted in 2005. The study approach was similar to the MVS in that many surface sediment samples were screened for the major classes of organic contaminants, and then the screening results and other available data were used to select a subset of samples for quantitative chemical analysis. Because the MVS was designed to obtain representative data on concentrations of contaminants in surface sediment throughout Sinclair Inlet, Dyes Inlet, Port Orchard Passage, and Rich Passage, aliquots of the 160 MVS sediment samples were used in the analysis for the Organics Verification Study. However, unlike metals screening methods, organics screening methods are not specific to individual organic compounds, and are not available for some target organics. Therefore, only the quantitative analytical results were used in the organics verification evaluation. The results of the Organics Verification Study showed that sediment quality outside of Sinclair Inlet is unlikely to be impaired because of organic contaminants. Similar to the results for metals, in Sinclair Inlet, the distribution of residual organic contaminants is generally limited to nearshore areas already within the

  8. Compliance and Verification of Standards and Labeling Programs in China: Lessons Learned

    SciTech Connect (OSTI)

    Saheb, Yamina; Zhou, Nan; Fridley, David; Pierrot, Andre

    2010-08-01

    After implementing several energy efficiency standards and labels (30 products covered by MEPS, 50 products covered by voluntary labels and 19 products by mandatory labels), the China National Institute of Standardization (CNIS) is now implementing verification and compliance mechanism to ensure that the energy information of labeled products comply with the requirements of their labels. CNIS is doing so by organizing check testing on a random basis for room air-conditioners, refrigerators, motors, heaters, computer displays, ovens, and self -ballasted lamps. The purpose of the check testing is to understand the implementation of the Chinese labeling scheme and help local authorities establishing effective compliance mechanisms. In addition, to ensure robustness and consistency of testing results, CNIS has coordinated a round robin testing for room air conditioners. Eight laboratories (Chinese (6), Australian (1) and Japanese (1)) have been involved in the round robin testing and tests were performed on four sets of samples selected from manufacturer's production line. This paper describes the methodology used in undertaking both check and round robin testing, provides analysis of testing results and reports on the findings. The analysis of both check and round robin testing demonstrated the benefits of a regularized verification and monitoring system for both laboratories and products such as (i) identifying the possible deviations between laboratories to correct them, (ii) improving the quality of testing facilities, (iii) ensuring the accuracy and reliability of energy label information in order to strength the social credibility of the labeling program and the enforcement mechanism in place.

  9. Compliance and Verification of Standards and Labelling Programs in China: Lessons Learned

    SciTech Connect (OSTI)

    Saheb, Yamina; Zhou, Nan; Fridley, David; Pierrot, Andr

    2010-06-11

    After implementing several energy efficiency standards and labels (30 products covered by MEPS, 50 products covered by voluntary labels and 19 products by mandatory labels), the China National Institute of Standardization (CNIS) is now implementing verification and compliance mechanism to ensure that the energy information of labeled products comply with the requirements of their labels. CNIS is doing so by organizing check testing on a random basis for room air-conditioners, refrigerators, motors, heaters, computer displays, ovens, and self -ballasted lamps. The purpose of the check testing is to understand the implementation of the Chinese labeling scheme and help local authorities establishing effective compliance mechanisms. In addition, to ensure robustness and consistency of testing results, CNIS has coordinated a round robin testing for room air conditioners. Eight laboratories (Chinese (6), Australian (1) and Japanese (1)) have been involved in the round robin testing and tests were performed on four sets of samples selected from manufacturer?s production line. This paper describes the methodology used in undertaking both check and round robin testing, provides analysis of testing results and reports on the findings. The analysis of both check and round robin testing demonstrated the benefits of a regularized verification and monitoring system for both laboratories and products such as (i) identifying the possible deviations between laboratories to correct them, (ii) improving the quality of testing facilities, (iii) ensuring the accuracy and reliability of energy label information in order to strength the social credibility of the labeling program and the enforcement mechanism in place.

  10. Interim Letter Report - Verification Survey of Partial Grid E9, David Witherspoon, Inc. 1630 Site Knoxville, Tennessee

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-06-12

    Conduct verification surveys of available grids at the DWI 1630 in Knoxville, Tennessee. A representative with the Independent Environmental Assessment and Verification (IEAV) team from ORISE conducted a verification survey of a partial area within Grid E9.

  11. Source position verification and dosimetry in HDR brachytherapy using an EPID

    SciTech Connect (OSTI)

    Smith, R. L.; Taylor, M. L.; School of Applied Sciences and Health Innovations Research Institute, RMIT University, Melbourne 3001; Physical Sciences, Peter MacCallum Cancer Centre, East Melbourne 3002 ; McDermott, L. N.; Franich, R. D.; Haworth, A.; Millar, J. L.

    2013-11-15

    Purpose: Accurate treatment delivery in high dose rate (HDR) brachytherapy requires correct source dwell positions and dwell times to be administered relative to each other and to the surrounding anatomy. Treatment delivery inaccuracies predominantly occur for two reasons: (i) anatomical movement or (ii) as a result of human errors that are usually related to incorrect implementation of the planned treatment. Electronic portal imaging devices (EPIDs) were originally developed for patient position verification in external beam radiotherapy and their application has been extended to provide dosimetric information. The authors have characterized the response of an EPID for use with an {sup 192}Ir brachytherapy source to demonstrate its use as a verification device, providing both source position and dosimetric information.Methods: Characterization of the EPID response using an {sup 192}Ir brachytherapy source included investigations of reproducibility, linearity with dose rate, photon energy dependence, and charge build-up effects associated with exposure time and image acquisition time. Source position resolution in three dimensions was determined. To illustrate treatment verification, a simple treatment plan was delivered to a phantom and the measured EPID dose distribution compared with the planned dose.Results: The mean absolute source position error in the plane parallel to the EPID, for dwells measured at 50, 100, and 150 mm source to detector distances (SDD), was determined to be 0.26 mm. The resolution of the z coordinate (perpendicular distance from detector plane) is SDD dependent with 95% confidence intervals of 0.1, 0.5, and 2.0 mm at SDDs of 50, 100, and 150 mm, respectively. The response of the EPID is highly linear to dose rate. The EPID exhibits an over-response to low energy incident photons and this nonlinearity is incorporated into the dose calibration procedure. A distance (spectral) dependent dose rate calibration procedure has been developed

  12. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    BAZINET, G.D.

    2000-11-03

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted

  13. Dosimetric characterization and output verification for conical brachytherapy surface applicators. Part I. Electronic brachytherapy source

    SciTech Connect (OSTI)

    Fulkerson, Regina K. Micka, John A.; DeWerd, Larry A.

    2014-02-15

    Purpose: Historically, treatment of malignant surface lesions has been achieved with linear accelerator based electron beams or superficial x-ray beams. Recent developments in the field of brachytherapy now allow for the treatment of surface lesions with specialized conical applicators placed directly on the lesion. Applicators are available for use with high dose rate (HDR){sup 192}Ir sources, as well as electronic brachytherapy sources. Part I of this paper will discuss the applicators used with electronic brachytherapy sources; Part II will discuss those used with HDR {sup 192}Ir sources. Although the use of these applicators has gained in popularity, the dosimetric characteristics including depth dose and surface dose distributions have not been independently verified. Additionally, there is no recognized method of output verification for quality assurance procedures with applicators like these. Existing dosimetry protocols available from the AAPM bookend the cross-over characteristics of a traditional brachytherapy source (as described by Task Group 43) being implemented as a low-energy superficial x-ray beam (as described by Task Group 61) as observed with the surface applicators of interest. Methods: This work aims to create a cohesive method of output verification that can be used to determine the dose at the treatment surface as part of a quality assurance/commissioning process for surface applicators used with HDR electronic brachytherapy sources (Part I) and{sup 192}Ir sources (Part II). Air-kerma rate measurements for the electronic brachytherapy sources were completed with an Attix Free-Air Chamber, as well as several models of small-volume ionization chambers to obtain an air-kerma rate at the treatment surface for each applicator. Correction factors were calculated using MCNP5 and EGSnrc Monte Carlo codes in order to determine an applicator-specific absorbed dose to water at the treatment surface from the measured air-kerma rate. Additionally

  14. Verification, validation, and predictive capability in computational engineering and physics.

    SciTech Connect (OSTI)

    Oberkampf, William Louis; Hirsch, Charles; Trucano, Timothy Guy

    2003-02-01

    Developers of computer codes, analysts who use the codes, and decision makers who rely on the results of the analyses face a critical question: How should confidence in modeling and simulation be critically assessed? Verification and validation (V&V) of computational simulations are the primary methods for building and quantifying this confidence. Briefly, verification is the assessment of the accuracy of the solution to a computational model. Validation is the assessment of the accuracy of a computational simulation by comparison with experimental data. In verification, the relationship of the simulation to the real world is not an issue. In validation, the relationship between computation and the real world, i.e., experimental data, is the issue.

  15. Bibliography for Verification and Validation in Computational Simulations

    SciTech Connect (OSTI)

    Oberkampf, W.L.

    1998-10-01

    A bibliography has been compiled dealing with the verification and validation of computational simulations. The references listed in this bibliography are concentrated in the field of computational fluid dynamics (CFD). However, references from the following fields are also included: operations research, heat transfer, solid dynamics, software quality assurance, software accreditation, military systems, and nuclear reactor safety. This bibliography, containing 221 references, is not meant to be comprehensive. It was compiled during the last ten years in response to the author's interest and research in the methodology for verification and validation. The emphasis in the bibliography is in the following areas: philosophy of science underpinnings, development of terminology and methodology, high accuracy solutions for CFD verification, experimental datasets for CFD validation, and the statistical quantification of model validation. This bibliography should provide a starting point for individual researchers in many fields of computational simulation in science and engineering.

  16. Verification and validation of RADMODL Version 1.0

    SciTech Connect (OSTI)

    Kimball, K.D.

    1993-03-01

    RADMODL is a system of linked computer codes designed to calculate the radiation environment following an accident in which nuclear materials are released. The RADMODL code and the corresponding Verification and Validation (V&V) calculations (Appendix A), were developed for Westinghouse Savannah River Company (WSRC) by EGS Corporation (EGS). Each module of RADMODL is an independent code and was verified separately. The full system was validated by comparing the output of the various modules with the corresponding output of a previously verified version of the modules. The results of the verification and validation tests show that RADMODL correctly calculates the transport of radionuclides and radiation doses. As a result of this verification and validation effort, RADMODL Version 1.0 is certified for use in calculating the radiation environment following an accident.

  17. A Zero Knowledge Protocol For Nuclear Warhead Verification

    SciTech Connect (OSTI)

    Glaser, Alexander; Goldston, Robert J.

    2014-03-14

    The verification of nuclear warheads for arms control faces a paradox: International inspectors must gain high confidence in the authenticity of submitted items while learning nothing about them. Conventional inspection systems featuring ''information barriers'', designed to hide measurments stored in electronic systems, are at risk of tampering and snooping. Here we show the viability of fundamentally new approach to nuclear warhead verification that incorporates a zero-knowledge protocol, designed such that sensitive information is never measured so does not need to be hidden. We interrogate submitted items with energetic neutrons, making in effect, differential measurements of neutron transmission and emission. Calculations of diversion scenarios show that a high degree of discrimination can be achieved while revealing zero information. Timely demonstration of the viability of such an approach could be critical for the nexxt round of arms-control negotiations, which will likely require verification of individual warheads, rather than whole delivery systems.

  18. Results of the independent radiological verification survey at the former Bridgeport Brass Company Facility, Seymour, Connecticut (SSC001)

    SciTech Connect (OSTI)

    Foley, R.D.; Rice, D.E.; Allred, J.F.; Brown, K.S.

    1995-03-01

    At the request of the USDOE, a team from ORNL conducted an independent radiological verification survey at the former Bridgeport Brass Company Facility, Seymour, Connecticut, from September 1992 to March 1993. Purpose of the survey was to determine whether residual levels of radioactivity inside the Ruffert Building and selected adjacent areas were rmediated to levels below DOE guidelines for FUSRAP sites. The property was contaminated with radioactive residues of {sup 238}U from uranium processing experiments conducted by Reactive Metals, Inc., from 1962 to 1964 for the Atomic Energy Commission. A previous radiological survey did not characterize the entire floor space because equipment which could not be moved at the time made it inaccessible for radiological surveys. During the remediation process, additional areas of elevated radioactivity were discovered under stationary equipment, which required additional remediation and further verification. Results of the independent radiological verification survey confirm that, with the exception of the drain system inside the building, residual uranium contamination has been remediated to levels below DOE guidelines for unrestricted release of property at FUSRAP sites inside and outside the Ruffert Building. However, certain sections of the drain system retain uranium contamination above DOE surface guideline levels. These sections of pipe are addressed in separate, referenced documentation.

  19. A golden anniversary for space-based treaty verification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A golden anniversary for space-based treaty verification A golden anniversary for space-based treaty verification Fifty years ago this month, LANL sensor technology lifted off into space to help verify that world Superpowers were abiding by the newly signed Limited Test Ban Treaty. October 22, 2013 Los Alamos National Laboratory researcher Richard Belian performs a final check of the Vela V-B satellite prior to its launch in April 1970. Vela V-B was the last of the Vela twin satellites launched

  20. Verification of warhead dismantelment and the importance of baseline validation

    SciTech Connect (OSTI)

    Buonpane, L.M.; Strait, R.S. )

    1991-01-01

    This paper presents an approach for evaluating verification regimes for nuclear warhead dismantlement. The approach is an adaptation of the traditional nuclear materials management model. As such the approach integrates the difficulties of verifying both stockpile estimates and numbers of warheads dismantled. Both random uncertainties and systematic uncertainties are considered in this approach. By making some basic assumptions about the relative uncertainties surrounding the stockpile estimates and the numbers of warheads dismantled, the authors illustrate their relative impacts on overall verification ability. The results highlight the need for increased attention on the problem of validating baseline declarations of stockpile size.

  1. Field Scale Test and Verification of CHP System at the Ritz Carlton...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Field Scale Test and Verification of CHP System at the Ritz Carlton, San Francisco, August 2007 Field Scale Test and Verification of CHP System at the Ritz Carlton, San Francisco, ...

  2. Comment submitted by InterMetro Industries Corp. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by InterMetro Industries Corp. regarding the Energy Star Verification Testing Program

  3. Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program

  4. Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program

  5. Comment submitted by Ingersoll Rand Residential Solutions regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Ingersoll Rand Residential Solutions regarding the Energy Star Verification Testing Program

  6. Comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program

  7. EECLP Webinar #2: Quality Assurance and Evaluation Monitoring Verification-- Text Version

    Broader source: Energy.gov [DOE]

    Below is the text version of the EECLP Webinar 2: Quality Assurance and Evaluation Monitoring Verification, presented in December 2014.

  8. Comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program

  9. Measurement and Verification Plan and Savings Calculations Methods Outline (IDIQ Attachment J-8)

    Broader source: Energy.gov [DOE]

    Document outlines measurement and verification (M&V) planning and savings calculation methods for an energy savings performance contract (ESPC).

  10. Comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program

  11. DOE Verification Testing in Support of ENERGY STAR, April 22, 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Verification Testing in Support of ENERGY STAR, April 22, 2011 DOE Verification Testing in Support of ENERGY STAR, April 22, 2011 This document describes ENERGY STAR verificaion testing process, dated April 22, 2011 estar_verification_process.pdf (368.74 KB) More Documents & Publications Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program Comment submitted by the North American Association of Food Equipment

  12. Comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program

  13. Measurement and Verification Activities Required in the Energy Savings Performance Contract Process

    Broader source: Energy.gov [DOE]

    There are four major measurement and verification (M&V) activities in the energy savings performance contract (ESPC) procurement process.

  14. Comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program

  15. Comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program

  16. ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office | Department of Energy Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office (72.39 KB) More Documents & Publications ORO Office Safeguards and Security Clearance Tracking System and

  17. Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program

  18. Comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program

  19. Tank waste remediation system FSAR hazard identification/facility configuration verification report

    SciTech Connect (OSTI)

    Mendoza, D.P., Westinghouse Hanford

    1996-05-01

    This document provides the results of the Tank Waste Remediation System Final Safety Analysis Report (TWRS FSAR) hazards identification/facility configuration activities undertaken from the period of March 7, 1996 to May 31, 1996. The purpose of this activity was to provide an independent overview of the TWRS facility specific hazards and configurations that were used in support of the TWRS FSAR hazards and accident analysis development. It was based on a review of existing published documentation and field inspections. The objective of the verification effort was to provide a `snap shot` in time of the existing TWRS facility hazards and configurations and will be used to support hazards and accident analysis activities.

  20. WE-F-16A-06: Using 3D Printers to Create Complex Phantoms for Dose Verification, Quality Assurance, and Treatment Planning System Commissioning in Radiotherapy

    SciTech Connect (OSTI)

    Kassaee, A; Ding, X; McDonough, J; Reiche, M; Witztum, A; Teo, B

    2014-06-15

    Purpose: To use 3D printers to design and construct complex geometrical phantoms for commissioning treatment planning systems, dose calculation algorithms, quality assurance (QA), dose delivery, and patient dose verifications. Methods: In radiotherapy, complex geometrical phantoms are often required for dose verification, dose delivery and calculation algorithm validation. Presently, fabrication of customized phantoms is limited due to time, expense and challenges in machining of complex shapes. In this work, we designed and utilized 3D printers to fabricate two phantoms for QA purposes. One phantom includes hills and valleys (HV) for verification of intensity modulated radiotherapy for photons, and protons (IMRT and IMPT). The other phantom includes cylindrical cavities (CC) of various sizes for dose verification of inhomogeneities. We evaluated the HV phantoms for an IMPT beam, and the CC phantom to study various inhomogeneity configurations using photon, electron, and proton beams. Gafcromic films were used to quantify the dose distributions delivered to the phantoms. Results: The HV phantom has dimensions of 12 cm 12 cm and consists of one row and one column of five peaks with heights ranging from 2 to 5 cm. The CC phantom has a size 10 cm 14 cm and includes 6 cylindrical cavities with length of 7.2 cm and diameters ranging from 0.6 to 1.2 cm. The IMPT evaluation using the HV phantom shows good agreement as compared to the dose distribution calculated with treatment planning system. The CC phantom also shows reasonable agreements for using different algorithms for each beam modalities. Conclusion: 3D printers with submillimiter resolutions are capable of printing complex phantoms for dose verification and QA in radiotherapy. As printing costs decrease and the technology becomes widely available, phantom design and construction will be readily available to any clinic for testing geometries that were not previously feasible.

  1. Independent Verification and Validation Of SAPHIRE 8 Volume 3 Users' Guide Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Volume 3 Users’ Guide is to assess the user documentation for its completeness, correctness, and consistency with respect to requirements for user interface and for any functionality that can be invoked by the user. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  2. Microsoft Word - DRAFT CRB Interview Guidance.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT CRB Interview Guidance.doc Microsoft Word - DRAFT CRB Interview Guidance.doc More Documents & Publications Microsoft Word - ARRAAttachment12v1.doc Microsoft Word - ARRAGuideAttachment10v1.doc Microsoft Word - Document2

  3. Interviews in Washington, DC for Albert Einstein Fellowship Semi-Finalists

    Broader source: Energy.gov [DOE]

    Selected semi-finalists in the Albert Einstein Distinguished Educator Fellowship are invited to DC for interviews.

  4. NMSSUP Phase 2 Transition/Readiness Verification Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Material Safeguards and Security Upgrade Project (NMSSUP) Phase II Transition/Readiness Verification Workshop Tuesday, April 30, 2013 Hilton Santa Fe Buffalo Thunder, Santa Fe, New Mexico Room reservation info Tewa Bay Meeting Room 1 Hosted by Los Alamos National Laboratory and NA-00-LA Field Office nmssup aerial Los Alamos National Laboratory, Technical Area 55

  5. Project W-030 flammable gas verification monitoring test

    SciTech Connect (OSTI)

    BARKER, S.A.

    1999-02-24

    This document describes the verification monitoring campaign used to document the ability of the new ventilation system to mitigate flammable gas accumulation under steady state tank conditions. This document reports the results of the monitoring campaign. The ventilation system configuration, process data, and data analysis are presented.

  6. Extremely accurate sequential verification of RELAP5-3D

    SciTech Connect (OSTI)

    Mesina, George L.; Aumiller, David L.; Buschman, Francis X.

    2015-11-19

    Large computer programs like RELAP5-3D solve complex systems of governing, closure and special process equations to model the underlying physics of nuclear power plants. Further, these programs incorporate many other features for physics, input, output, data management, user-interaction, and post-processing. For software quality assurance, the code must be verified and validated before being released to users. For RELAP5-3D, verification and validation are restricted to nuclear power plant applications. Verification means ensuring that the program is built right by checking that it meets its design specifications, comparing coding to algorithms and equations and comparing calculations against analytical solutions and method of manufactured solutions. Sequential verification performs these comparisons initially, but thereafter only compares code calculations between consecutive code versions to demonstrate that no unintended changes have been introduced. Recently, an automated, highly accurate sequential verification method has been developed for RELAP5-3D. The method also provides to test that no unintended consequences result from code development in the following code capabilities: repeating a timestep advancement, continuing a run from a restart file, multiple cases in a single code execution, and modes of coupled/uncoupled operation. In conclusion, mathematical analyses of the adequacy of the checks used in the comparisons are provided.

  7. SRS Software Verification Pre Operational and Startup Test

    SciTech Connect (OSTI)

    HILL, L.F.

    2000-10-18

    This document defines testing for the software used to control the Sodium Removal System (SRS). The testing is conducted off-line from the. physical plant by using a simulator built-in to the software. This provides verification of proper software operation prior to performing the operational acceptance tests with the actual plant hardware.

  8. Extremely accurate sequential verification of RELAP5-3D

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mesina, George L.; Aumiller, David L.; Buschman, Francis X.

    2015-11-19

    Large computer programs like RELAP5-3D solve complex systems of governing, closure and special process equations to model the underlying physics of nuclear power plants. Further, these programs incorporate many other features for physics, input, output, data management, user-interaction, and post-processing. For software quality assurance, the code must be verified and validated before being released to users. For RELAP5-3D, verification and validation are restricted to nuclear power plant applications. Verification means ensuring that the program is built right by checking that it meets its design specifications, comparing coding to algorithms and equations and comparing calculations against analytical solutions and method ofmore » manufactured solutions. Sequential verification performs these comparisons initially, but thereafter only compares code calculations between consecutive code versions to demonstrate that no unintended changes have been introduced. Recently, an automated, highly accurate sequential verification method has been developed for RELAP5-3D. The method also provides to test that no unintended consequences result from code development in the following code capabilities: repeating a timestep advancement, continuing a run from a restart file, multiple cases in a single code execution, and modes of coupled/uncoupled operation. In conclusion, mathematical analyses of the adequacy of the checks used in the comparisons are provided.« less

  9. Cleanup Verification Package for the 118-F-6 Burial Ground

    SciTech Connect (OSTI)

    H. M. Sulloway

    2008-10-02

    This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car.

  10. Superior Energy Performance Measurement and Verification Protocol for Industry

    Broader source: Energy.gov [DOE]

    This Measurement and Verification Protocol for Industry defines the procedures that will be used to confirm conformance with the energy performance level requirements of the Superior Energy Performance® (SEP™) Program. The Program has two paths. This document is structured to reflect those different paths.

  11. Multi-canister overpack project -- verification and validation, MCNP 4A

    SciTech Connect (OSTI)

    Goldmann, L.H.

    1997-11-10

    This supporting document contains the software verification and validation (V and V) package used for Phase 2 design of the Spent Nuclear Fuel Multi-Canister Overpack. V and V packages for both ANSYS and MCNP are included. Description of Verification Run(s): This software requires that it be compiled specifically for the machine it is to be used on. Therefore to facilitate ease in the verification process the software automatically runs 25 sample problems to ensure proper installation and compilation. Once the runs are completed the software checks for verification by performing a file comparison on the new output file and the old output file. Any differences between any of the files will cause a verification error. Due to the manner in which the verification is completed a verification error does not necessarily indicate a problem. This indicates that a closer look at the output files is needed to determine the cause of the error.

  12. Retrospective analysis of 2D patient-specific IMRT verifications

    SciTech Connect (OSTI)

    Childress, Nathan L.; White, R. Allen; Bloch, Charles; Salehpour, Mohammad; Dong, Lei; Rosen, Isaac I.

    2005-04-01

    We performed 858 two-dimensional (2D) patient-specific intensity modulated radiotherapy verifications over a period of 18 months. Multifield, composite treatment plans were measured in phantom using calibrated Kodak EDR2 film and compared with the calculated dose extracted from two treatment planning systems. This research summarizes our findings using the normalized agreement test (NAT) index and the percent of pixels failing the gamma index as metrics to represent the agreement between measured and computed dose distributions. An in-house dose comparison software package was used to register and compare all verifications. We found it was important to use an automatic positioning algorithm to achieve maximum registration accuracy, and that our automatic algorithm agreed well with anticipated results from known phantom geometries. We also measured absolute dose for each case using an ion chamber. Because the computed distributions agreed with ion chamber measurements better than the EDR2 film doses, we normalized EDR2 data to the computed distributions. The distributions of both the NAT indices and the percentage of pixels failing the gamma index were found to be exponential distributions. We continue to use both the NAT index and percent of pixels failing gamma with 5%/3 mm criteria to evaluate future verifications, as these two metrics were found to be complementary. Our data showed that using 2%/2 mm or 3%/3 mm criteria produces results similar to those using 5%/3 mm criteria. Normalized comparisons that have a NAT index greater than 45 and/or more than 20% of the pixels failing gamma for 5%/3 mm criteria represent outliers from our clinical data set and require further analysis. Because our QA verification results were exponentially distributed, rather than a tight grouping of similar results, we continue to perform patient-specific QA in order to identify and correct outliers in our verifications. The data from this work could be useful as a reference for

  13. Online adaptation and verification of VMAT

    SciTech Connect (OSTI)

    Crijns, Wouter; Defraene, Gilles; Depuydt, Tom; Haustermans, Karin; Van Herck, Hans; Maes, Frederik; Van den Heuvel, Frank

    2015-07-15

    Purpose: This work presents a method for fast volumetric modulated arc therapy (VMAT) adaptation in response to interfraction anatomical variations. Additionally, plan parameters extracted from the adapted plans are used to verify the quality of these plans. The methods were tested as a prostate class solution and compared to replanning and to their current clinical practice. Methods: The proposed VMAT adaptation is an extension of their previous intensity modulated radiotherapy (IMRT) adaptation. It follows a direct (forward) planning approach: the multileaf collimator (MLC) apertures are corrected in the beam’s eye view (BEV) and the monitor units (MUs) are corrected using point dose calculations. All MLC and MU corrections are driven by the positions of four fiducial points only, without need for a full contour set. Quality assurance (QA) of the adapted plans is performed using plan parameters that can be calculated online and that have a relation to the delivered dose or the plan quality. Five potential parameters are studied for this purpose: the number of MU, the equivalent field size (EqFS), the modulation complexity score (MCS), and the components of the MCS: the aperture area variability (AAV) and the leaf sequence variability (LSV). The full adaptation and its separate steps were evaluated in simulation experiments involving a prostate phantom subjected to various interfraction transformations. The efficacy of the current VMAT adaptation was scored by target mean dose (CTV{sub mean}), conformity (CI{sub 95%}), tumor control probability (TCP), and normal tissue complication probability (NTCP). The impact of the adaptation on the plan parameters (QA) was assessed by comparison with prediction intervals (PI) derived from a statistical model of the typical variation of these parameters in a population of VMAT prostate plans (n = 63). These prediction intervals are the adaptation equivalent of the tolerance tables for couch shifts in the current clinical

  14. Renewable Energy and the International Performance Measurement and Verification Protocol

    SciTech Connect (OSTI)

    Walker, A.; Thompson, A.; Mills, D.; Kats, G. H.

    1999-04-14

    The Renewables Subcommittee for the International Performance Measurement and Verification Protocol (IPMVP) is developing a section of the IPMVP treating the special issues related to performance measurement of renewable energy systems. An industry consensus framework for measuring project benefits is important in realizing the promise of renewable energy. This work represents a voluntary, consensus-building process among sponsoring organizations from 21 countries and several disciplines. Measurement and Verification (M&V) can provide a common tool for standardization to support performance-based contracting, financing, and emissions trading. M&V can ensure that savings and generation requirements in energy projects will be achieved accurately and objectively. The protocol defines procedures that are consistently applicable to similar projects, internationally accepted, and reliable. Actual M&V project results can demonstrate success and provide developers, investors, lenders, and customers with more confidence in the value of future projects.

  15. Renewable energy and the International Performance Measurement and Verification Protocol

    SciTech Connect (OSTI)

    Walker, A.; Thompson, A.; Mills, D.; Kats, G.H.

    1999-07-01

    The Renewables Subcommittee for the International Performance Measurement and Verification Protocol (IPMVP) is developing a section of the IPMVP treating the special issues related to performance measurement of renewable energy systems. An industry consensus framework for measuring project benefits is important in realizing the promise of renewable energy. This work represents a voluntary, consensus-building process among sponsoring organizations from 21 countries and several disciplines. Measurement and Verification (M and V) can provide a common tool for standardization to support performance-based contracting, financing, and emissions trading. M and V can ensure that savings and generation requirements in energy projects will be achieved accurately and objectively. The protocol defines procedures that are consistently applicable to similar projects, internationally accepted, and reliable. Actual M and V project results can demonstrate success and provide developers, investors, lenders, and customers with more confidence in the value of future projects.

  16. The 2014 Sandia Verification and Validation Challenge: Problem statement

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hu, Kenneth; Orient, George

    2016-01-18

    This paper presents a case study in utilizing information from experiments, models, and verification and validation (V&V) to support a decision. It consists of a simple system with data and models provided, plus a safety requirement to assess. The goal is to pose a problem that is flexible enough to allow challengers to demonstrate a variety of approaches, but constrained enough to focus attention on a theme. This was accomplished by providing a good deal of background information in addition to the data, models, and code, but directing the participants' activities with specific deliverables. In this challenge, the theme ismore » how to gather and present evidence about the quality of model predictions, in order to support a decision. This case study formed the basis of the 2014 Sandia V&V Challenge Workshop and this resulting special edition of the ASME Journal of Verification, Validation, and Uncertainty Quantification.« less

  17. Lifecycle Verification of Tank Liner Polymers

    SciTech Connect (OSTI)

    Anovitz, Lawrence {Larry} M; Smith, Barton

    2014-03-01

    This report describes a method that was developed for the purpose of assessing the durability of thermoplastic liners used in a Type IV hydrogen storage tank during the tank s expected service life. In the method, a thermoplastic liner specimen is cycled between the maximum and minimum expected working temperatures while it is differentially pressurized with high-pressure hydrogen gas. The number of thermal cycling intervals corresponds to those expected within the tank s design lifetime. At prescribed intervals, hydrogen permeation measurements are done in situ to assess the ability of the liner specimen to maintain its hydrogen barrier properties and to model its permeability over the tank lifetime. Finally, the model is used to assess whether the steady-state leakage rate in the tank could potentially exceed the leakage specification for hydrogen fuel cell passenger vehicles. A durability assessment was performed on a specimen of high-density polyethylene (HDPE) that is in current use as a tank liner. Hydrogen permeation measurements were performed on several additional tank liner polymers as well as novel polymers proposed for use as storage tank liners and hydrogen barrier materials. The following technical barriers from the Fuel Cell Technologies Program MYRDD were addressed by the project: D. Durability of on-board storage systems lifetime of at least 1500 cycles G. Materials of construction vessel containment that is resistant to hydrogen permeation M. Lack of Tank Performance Data and Understanding of Failure Mechanisms And the following technical targets1 for on-board hydrogen storage systems R&D were likewise addressed: Operational cycle life (1/4 tank to full) FY 2017: 1500 cycles; Ultimate: 1500 cycles Environmental health & safety Permeation and leakage: Meets or exceeds applicable standards Loss of useable H2: FY 2017: 0.05 g/h/kg H2; Ultimate: 0.05 g/h/kg H2

  18. SU-E-T-578: MCEBRT, A Monte Carlo Code for External Beam Treatment Plan Verifications

    SciTech Connect (OSTI)

    Chibani, O; Ma, C; Eldib, A

    2014-06-01

    Purpose: Present a new Monte Carlo code (MCEBRT) for patient-specific dose calculations in external beam radiotherapy. The code MLC model is benchmarked and real patient plans are re-calculated using MCEBRT and compared with commercial TPS. Methods: MCEBRT is based on the GEPTS system (Med. Phys. 29 (2002) 835846). Phase space data generated for Varian linac photon beams (6 15 MV) are used as source term. MCEBRT uses a realistic MLC model (tongue and groove, rounded ends). Patient CT and DICOM RT files are used to generate a 3D patient phantom and simulate the treatment configuration (gantry, collimator and couch angles; jaw positions; MLC sequences; MUs). MCEBRT dose distributions and DVHs are compared with those from TPS in absolute way (Gy). Results: Calculations based on the developed MLC model closely matches transmission measurements (pin-point ionization chamber at selected positions and film for lateral dose profile). See Fig.1. Dose calculations for two clinical cases (whole brain irradiation with opposed beams and lung case with eight fields) are carried out and outcomes are compared with the Eclipse AAA algorithm. Good agreement is observed for the brain case (Figs 2-3) except at the surface where MCEBRT dose can be higher by 20%. This is due to better modeling of electron contamination by MCEBRT. For the lung case an overall good agreement (91% gamma index passing rate with 3%/3mm DTA criterion) is observed (Fig.4) but dose in lung can be over-estimated by up to 10% by AAA (Fig.5). CTV and PTV DVHs from TPS and MCEBRT are nevertheless close (Fig.6). Conclusion: A new Monte Carlo code is developed for plan verification. Contrary to phantombased QA measurements, MCEBRT simulate the exact patient geometry and tissue composition. MCEBRT can be used as extra verification layer for plans where surface dose and tissue heterogeneity are an issue.

  19. Setup verification and in vivo dosimetry during intraoperative radiation therapy (IORT) for prostate cancer

    SciTech Connect (OSTI)

    Soriani, Antonella; Landoni, Valeria; Marzi, Simona; Iaccarino, Giuseppe; Saracino, Biancamaria; Arcangeli, Giorgio; Benassi, Marcello

    2007-08-15

    The purpose of this study was to check the setup and dose delivered to the patients during intraoperative electron beam radiation therapy (IORT) for prostate cancer. Twenty eight patients underwent IORT after radical prostatectomy for prostate cancer by means of a dedicated mobile accelerator, Novac7 (by Hitesys, SpA, Italy). A 9 MeV electron beam at high dose per pulse was used. Eighteen patients received IORT at escalating doses of 16, 18, and 20 Gy at 85% isodose, six patients for each dose level. Further, ten patients received 20 Gy at 85% isodose. The electron applicator position was checked in all cases by means of two orthogonal images obtained with brilliance intensifier. Target and organ at risk doses were measured in vivo by a MOSFETs dosimetry system. MOSFETs and microMOSFET dosimeters were inserted into sterile catheters and directly positioned into the rectal lumen, for ten patients, and into the bladder to urethra anastomosis, in the last 14 cases. Verification at 0 deg. led to very few adjustments of setup while verifications at 90 deg. often suggested to bring the applicator closer to the target. In vivo dosimetry showed an absorbed dose into the rectum wall {<=}1% of the total dose. The average dose value inside the anastomosis, for the 12 patients analyzed, was 23.7 Gy with a standard deviation of {+-}7.6%, when the prescription was 20 Gy at 85% isodose. Using a C-arm mobile image intensifier, it is possible to assess if the positioning is correct and safe. Radio-opaque clips and liquid were necessary to obtain good visible images. In vivo MOSFETs dosimetry is feasible and reliable. A satisfactory agreement between measured and expected doses was found.

  20. SU-E-I-24: Method for CT Automatic Exposure Control Verification

    SciTech Connect (OSTI)

    Gracia, M; Olasolo, J; Martin, M; Bragado, L; Gallardo, N; Miquelez, S; Maneru, F; Lozares, S; Pellejero, S; Rubio, A

    2015-06-15

    Purpose: Design of a phantom and a simple method for the automatic exposure control (AEC) verification in CT. This verification is included in the computed tomography (CT) Spanish Quality Assurance Protocol. Methods: The phantom design is made from the head and the body phantom used for the CTDI measurement and PMMA plates (35×35 cm2) of 10 cm thickness. Thereby, three different thicknesses along the longitudinal axis are obtained which permit to evaluate the longitudinal AEC performance. Otherwise, the existent asymmetry in the PMMA layers helps to assess angular and 3D AEC operation.Recent acquisition in our hospital (August 2014) of Nomex electrometer (PTW), together with the 10 cm pencil ionization chamber, led to register dose rate as a function of time. Measurements with this chamber fixed at 0° and 90° on the gantry where made on five multidetector-CTs from principal manufacturers. Results: Individual analysis of measurements shows dose rate variation as a function of phantom thickness. The comparative analysis shows that dose rate is kept constant in the head and neck phantom while the PMMA phantom exhibits an abrupt variation between both results, being greater results at 90° as the thickness of the phantom is 3.5 times larger than in the perpendicular direction. Conclusion: Proposed method is simple, quick and reproducible. Results obtained let a qualitative evaluation of the AEC and they are consistent with the expected behavior. A line of future development is to quantitatively study the intensity modulation and parameters of image quality, and a possible comparative study between different manufacturers.

  1. Dosimetric verification of stereotactic radiosurgery/stereotactic radiotherapy dose distributions using Gafchromic EBT3

    SciTech Connect (OSTI)

    Cusumano, Davide; Fumagalli, Maria L.; Marchetti, Marcello; Fariselli, Laura; De Martin, Elena

    2015-10-01

    Aim of this study is to examine the feasibility of using the new Gafchromic EBT3 film in a high-dose stereotactic radiosurgery and radiotherapy quality assurance procedure. Owing to the reduced dimensions of the involved lesions, the feasibility of scanning plan verification films on the scanner plate area with the best uniformity rather than using a correction mask was evaluated. For this purpose, signal values dispersion and reproducibility of film scans were investigated. Uniformity was then quantified in the selected area and was found to be within 1.5% for doses up to 8 Gy. A high-dose threshold level for analyses using this procedure was established evaluating the sensitivity of the irradiated films. Sensitivity was found to be of the order of centiGray for doses up to 6.2 Gy and decreasing for higher doses. The obtained results were used to implement a procedure comparing dose distributions delivered with a CyberKnife system to planned ones. The procedure was validated through single beam irradiation on a Gafchromic film. The agreement between dose distributions was then evaluated for 13 patients (brain lesions, 5 Gy/die prescription isodose ~80%) using gamma analysis. Results obtained using Gamma test criteria of 5%/1 mm show a pass rate of 94.3%. Gamma frequency parameters calculation for EBT3 films showed to strongly depend on subtraction of unexposed film pixel values from irradiated ones. In the framework of the described dosimetric procedure, EBT3 films proved to be effective in the verification of high doses delivered to lesions with complex shapes and adjacent to organs at risk.

  2. A comparison of adjoint and data-centric verification techniques.

    SciTech Connect (OSTI)

    Wildey, Timothy Michael; Cyr, Eric Christopher; Shadid, John Nicolas; Pawlowski, Roger Patrick; Smith, Thomas Michael

    2013-03-01

    This document summarizes the results from a level 3 milestone study within the CASL VUQ effort. We compare the adjoint-based a posteriori error estimation approach with a recent variant of a data-centric verification technique. We provide a brief overview of each technique and then we discuss their relative advantages and disadvantages. We use Drekar::CFD to produce numerical results for steady-state Navier Stokes and SARANS approximations. 3

  3. Cleanup Verification Package for the 618-3 Burial Ground

    SciTech Connect (OSTI)

    M. J. Appel

    2006-09-12

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings.

  4. Enrichment Assay Methods Development for the Integrated Cylinder Verification System

    SciTech Connect (OSTI)

    Smith, Leon E.; Misner, Alex C.; Hatchell, Brian K.; Curtis, Michael M.

    2009-10-22

    International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are typically performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility's entire product-cylinder inventory. Pacific Northwest National Laboratory (PNNL) is developing a concept to automate the verification of enrichment plant cylinders to enable 100 percent product-cylinder verification and potentially, mass-balance calculations on the facility as a whole (by also measuring feed and tails cylinders). The Integrated Cylinder Verification System (ICVS) could be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. The three main objectives of this FY09 project are summarized here and described in more detail in the report: (1) Develop a preliminary design for a prototype NDA system, (2) Refine PNNL's MCNP models of the NDA system, and (3) Procure and test key pulse-processing components. Progress against these tasks to date, and next steps, are discussed.

  5. Monitoring and Commissioning Verification Algorithms for CHP Systems

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas; Jiang, Wei

    2008-03-31

    This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

  6. AUTOMATED, HIGHLY ACCURATE VERIFICATION OF RELAP5-3D

    SciTech Connect (OSTI)

    George L Mesina; David Aumiller; Francis Buschman

    2014-07-01

    Computer programs that analyze light water reactor safety solve complex systems of governing, closure and special process equations to model the underlying physics. In addition, these programs incorporate many other features and are quite large. RELAP5-3D[1] has over 300,000 lines of coding for physics, input, output, data management, user-interaction, and post-processing. For software quality assurance, the code must be verified and validated before being released to users. Verification ensures that a program is built right by checking that it meets its design specifications. Recently, there has been an increased importance on the development of automated verification processes that compare coding against its documented algorithms and equations and compares its calculations against analytical solutions and the method of manufactured solutions[2]. For the first time, the ability exists to ensure that the data transfer operations associated with timestep advancement/repeating and writing/reading a solution to a file have no unintended consequences. To ensure that the code performs as intended over its extensive list of applications, an automated and highly accurate verification method has been modified and applied to RELAP5-3D. Furthermore, mathematical analysis of the adequacy of the checks used in the comparisons is provided.

  7. IAEA verification experiment at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Subudhi, M.; Calvert, O.L.; Bonner, T.N.; Adams, J.G.; Cherry, R.C.; Whiting, N.E.

    1998-08-01

    In April 1996, the United States (US) added the Portsmouth Gaseous Diffusion Plant to the list of facilities eligible for the application of International Atomic Energy Agency (IAEA) safeguards. At that time, the US proposed that the IAEA carry out a Verification Experiment at the plant with respect to the downblending of about 13 metric tons of highly enriched uranium (HEU) in the form of UF{sub 6}. This material is part of the 226 metric tons of fissile material that President Clinton has declared to be excess to US national-security needs and which will be permanently withdrawn from the US nuclear stockpile. In September 1997, the IAEA agreed to carry out this experiment, and during the first three weeks of December 1997, the IAEA verified the design information concerning the downblending process. The plant has been subject to short-notice random inspections since December 17, 1997. This paper provides an overview of the Verification Experiment, the monitoring technologies used in the verification approach, and some of the experience gained to date.

  8. JPEG-2000 Part 10 Verification Model

    Energy Science and Technology Software Center (OSTI)

    2003-03-04

    published extensions to the baseline (Part 2, ISO 15444-2). As such, VM10 is an implementation of published international standards for digital image coding systems. The purpose of VM10 is to serve as a software platform for developing further extensions of the JPEG-2000 standard that will contribute to JPEG-2000 Part 10, "Extensions for Three-Dimensional Data and Floating Point Data" (currently under development). It will be used to test the performance and compati bility of poposed Part 10 algorithms. The authors of VM10 are active participants in the iSO standardization effort that is producing JPEG-2000 Part 10. The VM10 software will be distributed to other membes of the ISO still image coding standards committee (ISO/IEC JTC1/SC29/WG1). VM10 is only intended for the use of ISO/IEC JTC1/SC29/WG1, however, and will not be distributed to the general public. In particular, it is not being placed in the public domain (or "open-sourced"). The University of California/LANL will retain copyright on all LANL source code contained in the VM10 distribution. This does not preclude rights to this software retainied by the US government in accordance with its contract with the University of California.« less

  9. SU-E-J-145: Validation of An Analytical Model for in Vivo Range Verification Using GATE Monte Carlo Simulation in Proton Therapy

    SciTech Connect (OSTI)

    Lee, C; Lin, H; Chao, T; Hsiao, I; Chuang, K

    2015-06-15

    Purpose: Predicted PET images on the basis of analytical filtering approach for proton range verification has been successful developed and validated using FLUKA Monte Carlo (MC) codes and phantom measurements. The purpose of the study is to validate the effectiveness of analytical filtering model for proton range verification on GATE/GEANT4 Monte Carlo simulation codes. Methods: In this study, we performed two experiments for validation of predicted β+-isotope by the analytical model with GATE/GEANT4 simulations. The first experiments to evaluate the accuracy of predicting β+-yields as a function of irradiated proton energies. In second experiment, we simulate homogeneous phantoms of different materials irradiated by a mono-energetic pencil-like proton beam. The results of filtered β+-yields distributions by the analytical model is compared with those of MC simulated β+-yields in proximal and distal fall-off ranges. Results: The results investigate the distribution between filtered β+-yields and MC simulated β+-yields distribution in different conditions. First, we found that the analytical filtering can be applied over the whole range of the therapeutic energies. Second, the range difference between filtered β+-yields and MC simulated β+-yields at the distal fall-off region are within 1.5mm for all materials used. The findings validated the usefulness of analytical filtering model on range verification of proton therapy on GATE Monte Carlo simulations. In addition, there is a larger discrepancy between filtered prediction and MC simulated β+-yields using GATE code, especially in proximal region. This discrepancy might Result from the absence of wellestablished theoretical models for predicting the nuclear interactions. Conclusion: Despite the fact that large discrepancies of the distributions between MC-simulated and predicted β+-yields were observed, the study prove the effectiveness of analytical filtering model for proton range verification using

  10. General purpose steam table library : CASL L3:THM.CFD.P7.04 milestone report.

    SciTech Connect (OSTI)

    Carpenter, John H.; Belcourt, Noel; Nourgaliev, Robert

    2013-08-01

    Completion of the CASL L3 milestone THM.CFD.P7.04 provides a general purpose tabular interpolation library for material properties to support, in particular, standardized models for steam properties. The software consists of three parts, implementations of analytic steam models, a code to generate tables from those models, and an interpolation package to interface the tables to CFD codes such as Hydra-TH. Verification of the standard model is maintained through the entire train of routines. The performance of interpolation package exceeds that of freely available analytic implementation of the steam properties by over an order of magnitude.

  11. Measurement and Verification Options for Federal Energy- and Water-Saving

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects | Department of Energy Options for Federal Energy- and Water-Saving Projects Measurement and Verification Options for Federal Energy- and Water-Saving Projects Federal Energy Management Program measurement and verification (M&V) guidelines and International Performance Measurement and Verification Protocol M&V methodologies are broken into four options. These options offer generic M&V approaches for energy- and water-saving projects. Option A: Retrofit Isolation

  12. Indoor airPLUS Version 1 (Rev. 01) Verification Checklist | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Version 1 (Rev. 01) Verification Checklist Indoor airPLUS Version 1 (Rev. 01) Verification Checklist The Rev. 01 checklist has been modified to reflect only the additional Indoor airPLUS requirements and their corresponding section numbers that must be met after completing the ENERGY STAR checklists. iap_verification_checklist_rev_1.pdf (261.75 KB) More Documents & Publications Indoor airPLUS Construction Specifications Indoor airPLUS Construction Specifications Version 1 (Rev.

  13. WE-D-BRF-02: Acoustic Signal From the Bragg Peak for Range Verification in Proton Therapy

    SciTech Connect (OSTI)

    Reinhardt, S; Assmann, W; Fink, A; Thirolf, P; Parodi, K; Kellnberger, S; Omar, M; Ntziachristos, V; Gaebisch, C; Moser, M; Dollinger, G; Sergiadis, G

    2014-06-15

    Purpose: Range verification in ion beam therapy relies to date on nuclear imaging techniques which require complex and costly detector systems. A different approach is the detection of thermoacoustic signals that are generated due to localized energy loss of ion beams. Aim of this work is to study the feasibility of determining the ion range with sub-mm accuracy by use of high frequency ultrasonic (US) transducers and to image the Bragg peak by tomography. Methods: A water phantom was irradiated by a pulsed 20 MeV proton beam with varying pulse intensity, length and repetition rate. The acoustic signal of single proton pulses was measured by different PZT-based US detectors (3.5 MHz and 10 MHz central frequencies). For tomography a 64 channel US detector array was used and moved along the ion track by a remotely controlled motor stage. Results: A clear signal of the Bragg peak was visible for an energy deposition as low as 10{sup 12} eV. The signal amplitude showed a linear increase with particle number per pulse and thus, dose. Range measurements were reproducible within +/? 20 micrometer and agreed well with Geant4 simulations. The tomographic reconstruction does not only allow to measure the ion range but also the beam spot size at the Bragg peak position. Conclusion: Range verification by acoustic means is a promising new technique for treatment modalities where the tumor can be localized by US imaging. Further improvement of sensitivity is required to account for higher attenuation of the US signal in tissue, as well as lower energy density in the Bragg peak in realistic treatment cases due to higher particle energy and larger spot sizes. Nevertheless, the acoustic range verification approach could offer the possibility of combining anatomical US imaging with Bragg Peak imaging in the near future. The work was funded by the DFG cluster of excellence Munich Centre for Advanced Photonics (MAP)

  14. SU-E-T-65: Characterization of a 2D Array for QA and Pretreatment Plan Verification

    SciTech Connect (OSTI)

    Anvari, A; Aghamiri, S; Mahdavi, S; Alaei, P

    2014-06-01

    Purpose: The OCTAVIUS detector729 is a 2D array of 729 air vented cubic plane parallel ion chambers used for pretreatment verification and QA. In this study we investigated dosimetric characteristics of this system for clinical photon beam dosimetry. Methods: Detector performance evaluation included determination of the location of the effective point of measurement (EPM), sensitivity, linearity, and reproducibility of detector response, as well as output factor, dose rate, and source to surface distance (SSD) dependence. Finally, assessment of wedge modulated fields was carried out. All the evaluations were performed five times for low and high photon energies. For reference measurements, a 0.6 cc ionization chamber was used. Data analysis and comparison of the OCTAVIUS detector with reference ion chamber data was performed using the VeriSoft patient plan verification software. Results: The reproducibility and stability of the measurements are excellent, the detector showed same signal with a maximum deviation of less than 0.5% in short and long term. Results of sensitivity test showed same signal with a maximum deviation of approximately 0.1%. As the detector 729 response is linear with dose and dose rate, it can be used for the measurement at regions of high dose gradient effectively. The detector agrees with the ionization chamber measurement to within 1% for SSD range of 75 to 125 cm. Also, its measured wedge modulated profiles matched very well with ion chamber dose profiles acquired in a water tank. Conclusions: As the response of the detector 729 is linear with dose and dose rate, it can be used for the measurements in the areas of dose gradients effectively. Based on the measurements and comparisons performed, this system is a reliable and accurate dosimeter for QA and pretreatment plan verification in radiotherapy.

  15. State and Local Energy Savings Performance Contracting: Savings Measurement and Verification

    Broader source: Energy.gov [DOE]

    This webinar, held on Feb. 24, 2011, covers background and benefits of measurement and verification and highlights activities for state and local energy savings performance contracting.

  16. PDET-A New Tool for Partial Defect Verification of Pressurized...

    Office of Scientific and Technical Information (OSTI)

    PDET-A New Tool for Partial Defect Verification of Pressurized Water Reactor Spent Fuel ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  17. INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-05-24

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0

  18. 2003 Idaho National Engineering and Environmental Laboratory Shallow Injection Well Verification and Status Report

    SciTech Connect (OSTI)

    Lewis, M.G.

    2003-08-21

    A detailed verification of the shallow injection well inventory for Bechtel BWXT Idaho, LLC and Argonne National Laboratory-West-operated facilities was performed in 2003. Fourteen wells, or 20%, were randomly selected for the verification. This report provides updated information on the 14 shallow injection wells that were randomly selected for the 2003 verification. Where applicable, additional information is provided for shallow injection wells that were not selected for the 2003 verification. This updated information was incorporated into the 2003 Shallow Injection Wells Inventory, Sixty-eight wells were removed from the 2003 Shallow Injection Well Inventory.

  19. 2003 Idaho National Engineering and Environmental Laboratory Shallow Injection Well Verification and Status Report

    SciTech Connect (OSTI)

    Mike Lewis

    2003-08-01

    A detailed verification of the shallow injection well inventory for Bechtel BWXT Idaho, LLC and Argonne National Laboratory-West-operated facilities was performed in 2003. Fourteen wells, or 20%, were randomly selected for the verification. This report provides updated information on the 14 shallow injection wells that were randomly selected for the 2003 verification. Where applicable, additional information is provided for shallow injection wells that were not selected for the 2003 verification. This updated information was incorporated into the 2003 Shallow Injection Wells Inventory. Sixty-eight wells were removed from the 2003 Shallow Injection Well Inventory.

  20. High Impact Technology Hub- Resources for Evaluators- General Measurement and Verification Plans

    Broader source: Energy.gov [DOE]

    The HIT Catalyst conducts technology demonstrations in three main phases govern demonstrations: Site Evaluation, Selection and Project Kick-Off, Measurement and Verification Scoping and Plan...

  1. PDET-A New Tool for Partial Defect Verification of Pressurized...

    Office of Scientific and Technical Information (OSTI)

    of Pressurized Water Reactor Spent Fuel Assemblies Citation Details In-Document Search Title: PDET-A New Tool for Partial Defect Verification of Pressurized Water Reactor Spent ...

  2. OPS 9.10 Independent Verification 8/24/98 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Independent Verification 8/24/98 OPS 9.10 Independent Verification 8/24/98 The objective of this surveillance is to evaluate the conduct of selected independent verification activities. This surveillance provides a basis for evaluating the effectiveness of the contractor's independent verifications programs and for establishing compliance with DOE requirements. OPS9-10.doc (35.5 KB) More Documents & Publications OPS 9.2 Shift Routines and Operating Practices 8/24/98 OPS 9.12 Operations

  3. M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0)

    Broader source: Energy.gov [DOE]

    Document outlines the Federal Energy Management Program's standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers.

  4. Code verification for the eXtended Finite Element Method (XFEM...

    Office of Scientific and Technical Information (OSTI)

    Title: Code verification for the eXtended Finite Element Method (XFEM): the compound cohesionless impact problem. Abstract not provided. Authors: Niederhaus, John Henry ; Voth, ...

  5. INDEPENDENT VERIFICATION SURVEY REPORT OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect (OSTI)

    W.C. Adams

    2010-07-21

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-03-0

  6. M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

    SciTech Connect (OSTI)

    2015-11-02

    Document outlines the Federal Energy Management Program's standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers.

  7. Round-Robin Verification and Final Development of the IEC 62788...

    Office of Scientific and Technical Information (OSTI)

    Verification and Final Development of the IEC 62788-1-5 Encapsulation Size Change Test; NREL (National Renewable Energy Laboratory) Citation Details In-Document Search Title:...

  8. Safeguards Verification Measurements using Laser Ablation, Absorbance Ratio Spectrometry in Gaseous Centrifuge Enrichment Plants

    SciTech Connect (OSTI)

    Anheier, Norman C.; Cannon, Bret D.; Qiao, Hong; Phillips, Jon R.

    2012-07-01

    Laser Ablation Absorbance Ratio Spectrometry (LAARS) is a new verification measurement technology under development at the US Department of Energy’s (DOE) Pacific Northwest National Laboratory (PNNL). LAARS uses three lasers to ablate and then measure the relative isotopic abundance of uranium compounds. An ablation laser is tightly focused on uranium-bearing solids producing a small plume containing uranium atoms. Two collinear wavelength-tuned spectrometry lasers transit through the plume and the absorbance of U-235 and U-238 isotopes are measured to determine U-235 enrichment. The measurement has high relative precision and detection limits approaching the femtogram range for uranium. It is independent of chemical form and degree of dilution with nuisance dust and other materials. High speed sample scanning and pinpoint characterization allow measurements on millions of particles/hour to detect and analyze the enrichment of trace uranium in samples. The spectrometer is assembled using commercially available components at comparatively low cost, and features a compact and low power design. Future designs can be engineered for reliable, autonomous deployment within an industrial plant environment. Two specific applications of the spectrometer are under development: 1) automated unattended aerosol sampling and analysis and 2) on-site small sample destructive assay measurement. The two applications propose game-changing technological advances in gaseous centrifuge enrichment plant (GCEP) safeguards verification. The aerosol measurement instrument, LAARS-environmental sampling (ES), collects aerosol particles from the plant environment in a purpose-built rotating drum impactor and then uses LAARS-ES to quickly scan the surface of the impactor to measure the enrichments of the captured particles. The current approach to plant misuse detection involves swipe sampling and offsite analysis. Though this approach is very robust it generally requires several months to

  9. Development of a portal monitor for UF6 cylinder verification

    SciTech Connect (OSTI)

    Smith, Leon E.; Curtis, Michael M.; Shaver, Mark W.; Benz, Jacob M.; Misner, Alex C.; Mace, Emily K.; Jordan, David V.; Noss, Daniel; Ford, Herbert

    2009-10-06

    International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility’s operations. As additional enrichment plans come online to support the expansion of nuclear power, reducing person-days of inspection will take on greater importance. Pacific Northwest National Laboratory (PNNL) is developing a concept to automate the verification of enrichment plant cylinders to enable 100% product-cylinder verification and potentially, mass-balance calculations on the facility as a whole (by also measuring feed and tails cylinders). The Automated Cylinder Enrichment Verification System (ACEVS) would be located at key measurement points and will positively identify each cylinder, measure its mass and enrichment, store the data along with operator inputs in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. Given the potential for reduced inspector presence, the operational and manpower-reduction benefits of the portal concept are clear. However, it is necessary to assess whether the cylinder portal concept can meet, or potentially improve upon, today’s U-235 enrichment assay performance. PNNL’s ACEVS concept utilizes sensors that could be operated in an unattended mode: moderated He-3 neutron detectors and large NaI(Tl) scintillators for gamma-ray spectroscopy. The medium-resolution NaI(Tl) scintillators are a sacrifice in energy resolution but do provide high collection efficiency for signatures above 1 MeV. The He-3/NaI sensor combination allows the exploitation of additional, more-penetrating signatures than those currently utilized: Neutrons produced from F-19(μ,n) reactions (spawned primarily from U-234 alpha emission) and high-energy gamma rays (extending up to 10 MeV) induced by

  10. A Runtime Verification Framework for Control System Simulation

    SciTech Connect (OSTI)

    Ciraci, Selim; Fuller, Jason C.; Daily, Jeffrey A.; Makhmalbaf, Atefe; Callahan, Charles D.

    2014-08-02

    n a standard workflow for the validation of a control system, the control system is implemented as an extension to a simulator. Such simulators are complex software systems, and engineers may unknowingly violate constraints a simulator places on extensions. As such, errors may be introduced in the implementation of either the control system or the simulator leading to invalid simulation results. This paper presents a novel runtime verification approach for verifying control system implementations within simulators. The major contribution of the approach is the two-tier specification process. In the first tier, engineers model constraints using a domain-specific language tailored to modeling a controllers response to changes in its input. The language is high-level and effectively hides the implementation details of the simulator, allowing engineers to specify design-level constraints independent of low-level simulator interfaces. In the second tier, simulator developers provide mapping rules for mapping design-level constraints to the implementation of the simulator. Using the rules, an automated tool transforms the design-level specifications into simulator-specific runtime verification specifications and generates monitoring code which is injected into the implementation of the simulator. During simulation, these monitors observe the input and output variables of the control system and report changes to the verifier. The verifier checks whether these changes follow the constraints of the control system. We describe application of this approach to the verification of the constraints of an HVAC control system implemented with the power grid simulator GridLAB-D.

  11. VERIFICATION SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES

    Office of Legacy Management (LM)

    ~ *-,-' .r_~, VERIFICATION SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES BUILDING 513-519 NEW YORK, NEW YORK Prepared by W. C. Adams Environmental Survey and Site Assessment Program Energy/Environment Systems Division Oak Ridge Institute for Science and Education Oak Ridge, Tennessee 37831-0117 Prepared for the Office of Environmental Restoration U.S. Department of Energy FINAL REPORT JUNE 1994 This report is based on work performed under contract number DE-AC05-760R00033 with the U.S. Department

  12. Microsoft Word - S0191800 - Gunnison Verification Monitoring Report 0906.doc

    Office of Legacy Management (LM)

    6 Office of Legacy Management DOE M/1305-2006 -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy S0191800 DOE-LM/1305-2006 Office of Legacy Management Verification Monitoring Report for the Gunnison, Colorado, Processing Site September 2006 Work Performed by S.M.

  13. Microsoft Word - beam characterization and verification.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Characterization and Verification Detector Components and Arrangement The beam uniformity and flux are determined using an array of five particle detectors. Each detector consists of Bicron BC-400 scintillator, a Bicron BC-634A optical coupling pad, a Hamamatsu R1635 photomultiplier tube, and a Hamamatsu E1761-04 tube base. Four of the detectors are fixed in position as show in Figure 1 and set up to measure beam particle counting rates continuously at four characteristic points, each 1.64

  14. Superior Energy Performance Measurement and Verification Protocol for Industry

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Superior Energy Performance Measurement and Verification Protocol for Industry November 19, 2012 Table of Contents ©2012, The Regents of the University of California Notice: this manuscript has been authored by employees of the Regents of the University of California, and others, under Contract No DE-AC02-05CH11231 with the U.S. Department of Energy, for the management and operation of the Lawrence Berkeley National Laboratory. The United State Government retains a non-exclusive, paid-up,

  15. Cleanup Verification Package for the 116-K-2 Effluent Trench

    SciTech Connect (OSTI)

    J. M. Capron

    2006-04-04

    This cleanup verification package documents completion of remedial action for the 116-K-2 effluent trench, also referred to as the 116-K-2 mile-long trench and the 116-K-2 site. During its period of operation, the 116-K-2 site was used to dispose of cooling water effluent from the 105-KE and 105-KW Reactors by percolation into the soil. This site also received mixed liquid wastes from the 105-KW and 105-KE fuel storage basins, reactor floor drains, and miscellaneous decontamination activities.

  16. Verification of RESRAD-RDD. (Version 2.01)

    SciTech Connect (OSTI)

    Cheng, Jing-Jy; Flood, Paul E.; LePoire, David; Kamboj, Sunita; Yu, Charley

    2015-09-01

    In this report, the results generated by RESRAD-RDD version 2.01 are compared with those produced by RESRAD-RDD version 1.7 for different scenarios with different sets of input parameters. RESRAD-RDD version 1.7 is spreadsheet-driven, performing calculations with Microsoft Excel spreadsheets. RESRAD-RDD version 2.01 revamped version 1.7 by using command-driven programs designed with Visual Basic.NET to direct calculations with data saved in Microsoft Access database, and re-facing the graphical user interface (GUI) to provide more flexibility and choices in guideline derivation. Because version 1.7 and version 2.01 perform the same calculations, the comparison of their results serves as verification of both versions. The verification covered calculation results for 11 radionuclides included in both versions: Am-241, Cf-252, Cm-244, Co-60, Cs-137, Ir-192, Po-210, Pu-238, Pu-239, Ra-226, and Sr-90. At first, all nuclidespecific data used in both versions were compared to ensure that they are identical. Then generic operational guidelines and measurement-based radiation doses or stay times associated with a specific operational guideline group were calculated with both versions using different sets of input parameters, and the results obtained with the same set of input parameters were compared. A total of 12 sets of input parameters were used for the verification, and the comparison was performed for each operational guideline group, from A to G, sequentially. The verification shows that RESRAD-RDD version 1.7 and RESRAD-RDD version 2.01 generate almost identical results; the slight differences could be attributed to differences in numerical precision with Microsoft Excel and Visual Basic.NET. RESRAD-RDD version 2.01 allows the selection of different units for use in reporting calculation results. The results of SI units were obtained and compared with the base results (in traditional units) used for comparison with version 1.7. The comparison shows that RESRAD

  17. Digital data storage systems, computers, and data verification methods

    DOE Patents [OSTI]

    Groeneveld, Bennett J.; Austad, Wayne E.; Walsh, Stuart C.; Herring, Catherine A.

    2005-12-27

    Digital data storage systems, computers, and data verification methods are provided. According to a first aspect of the invention, a computer includes an interface adapted to couple with a dynamic database; and processing circuitry configured to provide a first hash from digital data stored within a portion of the dynamic database at an initial moment in time, to provide a second hash from digital data stored within the portion of the dynamic database at a subsequent moment in time, and to compare the first hash and the second hash.

  18. This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing of models that are part of the AHAM verification program.

    Broader source: Energy.gov [DOE]

    This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing of models that are part of the AHAM verification program.

  19. Neutron spectrometry for UF6 enrichment verification in storage cylinders

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mengesha, Wondwosen; Kiff, Scott D.

    2015-01-29

    Verification of declared UF6 enrichment and mass in storage cylinders is of great interest in nuclear material nonproliferation. Nondestructive assay (NDA) techniques are commonly used for safeguards inspections to ensure accountancy of declared nuclear materials. Common NDA techniques used include gamma-ray spectrometry and both passive and active neutron measurements. In the present study, neutron spectrometry was investigated for verification of UF6 enrichment in 30B storage cylinders based on an unattended and passive measurement approach. MCNP5 and Geant4 simulated neutron spectra, for selected UF6 enrichments and filling profiles, were used in the investigation. The simulated neutron spectra were analyzed using principalmore » component analysis (PCA). The PCA technique is a well-established technique and has a wide area of application including feature analysis, outlier detection, and gamma-ray spectral analysis. Results obtained demonstrate that neutron spectrometry supported by spectral feature analysis has potential for assaying UF6 enrichment in storage cylinders. The results from the present study also showed that difficulties associated with the UF6 filling profile and observed in other unattended passive neutron measurements can possibly be overcome using the approach presented.« less

  20. TRU waste certification and TRUPACT-2 payload verification

    SciTech Connect (OSTI)

    Hunter, E.K. . Waste Isolation Pilot Plant Project Office); Johnson, J.E. . Waste Isolation Div.)

    1990-01-01

    The Waste Isolation Pilot Plant (WIPP) established a policy that requires each waste shipper to verify that all waste shipments meet the requirements of the Waste Acceptance Criteria (WAC) prior to being shipped. This verification provides assurance that transuranic (TRU) wastes meet the criteria while still retained in a facility where discrepancies can be immediately corrected. Each Department of Energy (DOE) TRU waste facility planning to ship waste to the Waste Isolation Pilot Plant (WIPP) is required to develop and implement a specific program including Quality Assurance (QA) provisions to verify that waste is in full compliance with WIPP's WAC. This program is audited by a composite DOE and contractor audit team prior to granting the facility permission to certify waste. During interaction with the Nuclear Regulatory Commission (NRC) on payload verification for shipping in TRUPACT-II, a similar system was established by DOE. The TRUPACT-II Safety Analysis Report (SAR) contains the technical requirements and physical and chemical limits that payloads must meet (like the WAC). All shippers must plan and implement a payload control program including independent QA provisions. A similar composite audit team will conduct preshipment audits, frequent subsequent audits, and operations inspections to verify that all TRU waste shipments in TRUPACT-II meet the requirements of the Certificate of Compliance issued by the NRC which invokes the SAR requirements. 1 fig.

  1. Comments for A Conference on Verification in the 21st Century

    SciTech Connect (OSTI)

    Doyle, James E.

    2012-06-12

    The author offers 5 points for the discussion of Verification and Technology: (1) Experience with the implementation of arms limitation and arms reduction agreements confirms that technology alone has never been relied upon to provide effective verification. (2) The historical practice of verification of arms control treaties between Cold War rivals may constrain the cooperative and innovative use of technology for transparency, veification and confidence building in the future. (3) An area that has been identified by many, including the US State Department and NNSA as being rich for exploration for potential uses of technology for transparency and verification is information and communications technology (ICT). This includes social media, crowd-sourcing, the internet of things, and the concept of societal verification, but there are issues. (4) On the issue of the extent to which verification technologies are keeping pace with the demands of future protocols and agrements I think the more direct question is ''are they effective in supporting the objectives of the treaty or agreement?'' In this regard it is important to acknowledge that there is a verification grand challenge at our doorstep. That is ''how does one verify limitations on nuclear warheads in national stockpiles?'' (5) Finally, while recognizing the daunting political and security challenges of such an approach, multilateral engagement and cooperation at the conceptual and technical levels provides benefits for addressing future verification challenges.

  2. Validation and verification plan for safety and PRA codes. Revision 1

    SciTech Connect (OSTI)

    Ades, M.J.; Crowe, R.D.; Toffer, H.

    1991-04-01

    This report discusses a verification and validation (V&V) plan for computer codes used for safety analysis and probabilistic risk assessment calculations. The present plan fulfills the commitments by Westinghouse Savannah River Company (WSRC) to the Department of Energy Savannah River Office (DOE-SRO) to bring the essential safety analysis and probabilistic risk assessment codes in compliance with verification and validation requirements.

  3. Microsoft Word - S05773_2009 VerifMonRpt.doc

    Office of Legacy Management (LM)

    September 2009 LMS/DUP/S05773 This page intentionally left blank LMS/DUP/S05773 Office of Legacy Management Verification Monitoring Report for the Durango, Colorado, Processing Site September 2009 This page intentionally left blank U.S. Department of Energy Verification Monitoring Report-Durango, Colorado, Processing Site September 2009 Doc. No. S05773 Page i Contents

  4. Lloyd's Register Quality Assurance, Inc. Now Available as Accredited SEP Verification Body

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is pleased to announce that Lloyd's Register Quality Assurance, Inc. (LRQA) is now a fully accredited Verification Body for Superior Energy Performance® (SEP™). This ANSI-ANAB accreditation enables LRQA to provide third-party verification for industrial facilities that wish to demonstrate energy management excellence and sustained energy savings to earn SEP certification.

  5. Initial Clinical Experience Performing Patient Treatment Verification With an Electronic Portal Imaging Device Transit Dosimeter

    SciTech Connect (OSTI)

    Berry, Sean L.; Polvorosa, Cynthia; Cheng, Simon; Deutsch, Israel; Chao, K. S. Clifford; Wuu, Cheng-Shie

    2014-01-01

    Purpose: To prospectively evaluate a 2-dimensional transit dosimetry algorithm's performance on a patient population and to analyze the issues that would arise in a widespread clinical adoption of transit electronic portal imaging device (EPID) dosimetry. Methods and Materials: Eleven patients were enrolled on the protocol; 9 completed and were analyzed. Pretreatment intensity modulated radiation therapy (IMRT) patient-specific quality assurance was performed using a stringent local 3%, 3-mm ? criterion to verify that the planned fluence had been appropriately transferred to and delivered by the linear accelerator. Transit dosimetric EPID images were then acquired during treatment and compared offline with predicted transit images using a global 5%, 3-mm ? criterion. Results: There were 288 transit images analyzed. The overall ? pass rate was 89.1% 9.8% (average 1 SD). For the subset of images for which the linear accelerator couch did not interfere with the measurement, the ? pass rate was 95.7% 2.4%. A case study is presented in which the transit dosimetry algorithm was able to identify that a lung patient's bilateral pleural effusion had resolved in the time between the planning CT scan and the treatment. Conclusions: The EPID transit dosimetry algorithm under consideration, previously described and verified in a phantom study, is feasible for use in treatment delivery verification for real patients. Two-dimensional EPID transit dosimetry can play an important role in indicating when a treatment delivery is inconsistent with the original plan.

  6. Development of Monitoring & Verification Technology (MVT) for Carbon Sequestration in Terrestrial Ecosystems: Instrumentation and Protocols

    SciTech Connect (OSTI)

    Wielopolski, Lucian

    2008-09-29

    The objective of this CRADA is to further develop the Multiple Elemental Soil Analysis (MESA) system, based on inelastic neutron scattering technology that was originally developed by Dr. Lucian Wielopolski at BNL. The scope of this CRADA will center on the quantification and monitoring of non-destructive in situ carbon loading in soils to evaluate land application emission reduction activities. To accomplish this objective, the CRADA will center on three main joint activities as described below: A. To further develop and characterize a prototype, field deployable MESA system for static and scanning purposes. B. To develop applicable protocols for agricultural land applications; system validation and field sampling schemes. C. To implement field experiments for independent systems validation, verification, and acceptance by third parties for use in the market segment and commercialization. The technical approach involves a system for monitoring characteristic gamma rays emitted from carbon nuclei stimulated by inelastic neutron scattering from a carbon nucleus. The system consists of a neutron generator emitting fast, 14 MeV, neutrons, shielding materials, and a detection system with nuclear electronics for data acquisition. Following standard system calibration, the results are produced immediately at the end of the counting period.

  7. CaveMan Enterprise version 1.0 Software Validation and Verification.

    SciTech Connect (OSTI)

    Hart, David

    2014-10-01

    The U.S. Department of Energy Strategic Petroleum Reserve stores crude oil in caverns solution-mined in salt domes along the Gulf Coast of Louisiana and Texas. The CaveMan software program has been used since the late 1990s as one tool to analyze pressure mea- surements monitored at each cavern. The purpose of this monitoring is to catch potential cavern integrity issues as soon as possible. The CaveMan software was written in Microsoft Visual Basic, and embedded in a Microsoft Excel workbook; this method of running the CaveMan software is no longer sustainable. As such, a new version called CaveMan Enter- prise has been developed. CaveMan Enterprise version 1.0 does not have any changes to the CaveMan numerical models. CaveMan Enterprise represents, instead, a change from desktop-managed work- books to an enterprise framework, moving data management into coordinated databases and porting the numerical modeling codes into the Python programming language. This document provides a report of the code validation and verification testing.

  8. IAEA Verification Experiment at the Portsmouth Gaseous Diffusion Plant: Report on the Cascade Header Enrichment Monitor

    SciTech Connect (OSTI)

    P. L. Kerr; D. A. Close; W. S. Johnson; R. M. Kandarian; C. E. Moss; C. D. Romero

    1999-03-01

    The authors describe the Cascade Header Enrichment Monitor (CHEM) for the Portsmouth Gaseous Diffusion Plant at Piketon, Ohio, and present the calibration and measurement results. The US government has offered excess fissile material that is no longer needed for defense purposes for International Atomic Energy Agency (IAEA) inspection. Measurement results provided by the CHEM were used by the IAEA in a verification experiment to provide confidence that the US successfully blended excess highly enriched uranium (HEU) down to low enriched uranium (LEU). The CHEM measured the uranium enrichment in two cascade header pipes, a 20.32-cm HEU pipe and a 7.62-cm product LEU pipe. The CHEM determines the amount of {sup 235}U from the 185.7-keV gamma-ray photopeak and the amount of total uranium by x-ray fluorescence (XRF) of the 98.4-keV x-ray from uranium with a {sup 57}Co XRF source. The ratio yields the enrichment. The CHEM consists of a collimator assembly, an electromechanically cooled germanium detector, and a rack-mounted personal computer running commercial and custom software. The CHEM was installed in December 1997 and was used by the IAEA inspectors for announced and unannounced inspections on the HEU and LEU header pipes through October 1998. The equipment was sealed with tamper-indicating enclosures when the inspectors were not present.

  9. Use of Social Media to Target Information-Driven Arms Control and Nonproliferation Verification

    SciTech Connect (OSTI)

    Kreyling, Sean J.; Williams, Laura S.; Gastelum, Zoe N.; Whattam, Kevin M.; Corley, Courtney D.; Cramer, Nicholas O.; Rose, Stuart J.; Bell, Eric B.; Gregory, Michelle L.

    2012-07-19

    There has been considerable discussion within the national security community, including a recent workshop sponsored by the U.S. State Department, about the use of social media for extracting patterns of collective behavior and influencing public perception in areas relevant to arms control and nonproliferation. This paper seeks to explore if, and how, social media can be used to supplement nonproliferation and arms control inspection and monitoring activities on states and sites of greatest proliferation relevance. In this paper, we set the stage for how social media can be applied in this problem space and describe some of the foreseen challenges, including data validation, sources and attributes, verification, and security. Using information analytics and data visualization capabilities available at Pacific Northwest National Laboratory (PNNL), we provide graphical examples of some social media "signatures" of potential relevance for nonproliferation and arms control purposes. We conclude by describing a proposed case study and offering recommendations both for further research and next steps by the policy community.

  10. Review of Evaluation, Measurement and Verification Approaches Used to Estimate the Load Impacts and Effectiveness of Energy Efficiency Programs

    SciTech Connect (OSTI)

    Messenger, Mike; Bharvirkar, Ranjit; Golemboski, Bill; Goldman, Charles A.; Schiller, Steven R.

    2010-04-14

    Efficiency (2007) presented commonly used definitions for EM&V in the context of energy efficiency programs: (1) Evaluation (E) - The performance of studies and activities aimed at determining the effects and effectiveness of EE programs; (2) Measurement and Verification (M&V) - Data collection, monitoring, and analysis associated with the calculation of gross energy and demand savings from individual measures, sites or projects. M&V can be a subset of program evaluation; and (3) Evaluation, Measurement, and Verification (EM&V) - This term is frequently seen in evaluation literature. EM&V is a catchall acronym for determining both the effectiveness of program designs and estimates of load impacts at the portfolio, program and project level. This report is a scoping study that assesses current practices and methods in the evaluation, measurement and verification (EM&V) of ratepayer-funded energy efficiency programs, with a focus on methods and practices currently used for determining whether projected (ex-ante) energy and demand savings have been achieved (ex-post). M&V practices for privately-funded energy efficiency projects (e.g., ESCO projects) or programs where the primary focus is greenhouse gas reductions were not part of the scope of this study. We identify and discuss key purposes and uses of current evaluations of end-use energy efficiency programs, methods used to evaluate these programs, processes used to determine those methods; and key issues that need to be addressed now and in the future, based on discussions with regulatory agencies, policymakers, program administrators, and evaluation practitioners in 14 states and national experts in the evaluation field. We also explore how EM&V may evolve in a future in which efficiency funding increases significantly, innovative mechanisms for rewarding program performance are adopted, the role of efficiency in greenhouse gas mitigation is more closely linked, and programs are increasingly funded from multiple sources

  11. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    SciTech Connect (OSTI)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  12. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    When They Need It | Department of Energy Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It LaborWorks@NeighborWorks is a nonprofit temporary labor pool formed to assist professional contractors involved with the HEAT Squad during busy periods when they couldn't keep up with demand or hire full-time help. This interview provides background information about

  13. MO-G-BRE-04: Automatic Verification of Daily Treatment Deliveries and Generation of Daily Treatment Reports for a MR Image-Guided Treatment Machine

    SciTech Connect (OSTI)

    Yang, D; Li, X; Li, H; Wooten, H; Green, O; Rodriguez, V; Mutic, S

    2014-06-15

    Purpose: Two aims of this work were to develop a method to automatically verify treatment delivery accuracy immediately after patient treatment and to develop a comprehensive daily treatment report to provide all required information for daily MR-IGRT review. Methods: After systematically analyzing the requirements for treatment delivery verification and understanding the available information from a novel MR-IGRT treatment machine, we designed a method to use 1) treatment plan files, 2) delivery log files, and 3) dosimetric calibration information to verify the accuracy and completeness of daily treatment deliveries. The method verifies the correctness of delivered treatment plans and beams, beam segments, and for each segment, the beam-on time and MLC leaf positions. Composite primary fluence maps are calculated from the MLC leaf positions and the beam-on time. Error statistics are calculated on the fluence difference maps between the plan and the delivery. We also designed the daily treatment delivery report by including all required information for MR-IGRT and physics weekly review - the plan and treatment fraction information, dose verification information, daily patient setup screen captures, and the treatment delivery verification results. Results: The parameters in the log files (e.g. MLC positions) were independently verified and deemed accurate and trustable. A computer program was developed to implement the automatic delivery verification and daily report generation. The program was tested and clinically commissioned with sufficient IMRT and 3D treatment delivery data. The final version has been integrated into a commercial MR-IGRT treatment delivery system. Conclusion: A method was developed to automatically verify MR-IGRT treatment deliveries and generate daily treatment reports. Already in clinical use since December 2013, the system is able to facilitate delivery error detection, and expedite physician daily IGRT review and physicist weekly chart

  14. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  15. Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  16. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  17. FINAL REPORT INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS

    SciTech Connect (OSTI)

    ERIKA N. BAILEY

    2012-02-29

    ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

  18. REPORT OF THE WORKSHOP ON NUCLEAR FACILITY DESIGN INFORMATION EXAMINATION AND VERIFICATION FOR SAFEGUARDS

    SciTech Connect (OSTI)

    Richard Metcalf; Robert Bean

    2009-10-01

    Executive Summary The International Atomic Energy Agency (IAEA) implements nuclear safeguards and verifies countries are compliant with their international nuclear safeguards agreements. One of the key provisions in the safeguards agreement is the requirement that the country provide nuclear facility design and operating information to the IAEA relevant to safeguarding the facility, and at a very early stage. , This provides the opportunity for the IAEA to verify the safeguards-relevant features of the facility and to periodically ensure that those features have not changed. The national authorities (State System of Accounting for and Control of Nuclear Material - SSAC) provide the design information for all facilities within a country to the IAEA. The design information is conveyed using the IAEAs Design Information Questionnaire (DIQ) and specifies: (1) Identification of the facilitys general character, purpose, capacity, and location; (2) Description of the facilitys layout and nuclear material form, location, and flow; (3) Description of the features relating to nuclear material accounting, containment, and surveillance; and (4) Description of existing and proposed procedures for nuclear material accounting and control, with identification of nuclear material balance areas. The DIQ is updated as required by written addendum. IAEA safeguards inspectors examine and verify this information in design information examination (DIE) and design information verification (DIV) activities to confirm that the facility has been constructed or is being operated as declared by the facility operator and national authorities, and to develop a suitable safeguards approach. Under the Next Generation Safeguards Initiative (NGSI), the National Nuclear Security Administrations (NNSA) Office of Non-Proliferation and International Security identified the need for more effective and efficient verification of design information by the IAEA for improving international safeguards in

  19. Development and Verification of Tritium Analyses Code for a Very High Temperature Reactor

    SciTech Connect (OSTI)

    Chang H. Oh; Eung S. Kim

    2009-09-01

    A tritium permeation analyses code (TPAC) has been developed by Idaho National Laboratory for the purpose of analyzing tritium distributions in the VHTR systems including integrated hydrogen production systems. A MATLAB SIMULINK software package was used for development of the code. The TPAC is based on the mass balance equations of tritium-containing species and a various form of hydrogen (i.e., HT, H2, HTO, HTSO4, and TI) coupled with a variety of tritium source, sink, and permeation models. In the TPAC, ternary fission and neutron reactions with 6Li, 7Li 10B, 3He were taken into considerations as tritium sources. Purification and leakage models were implemented as main tritium sinks. Permeation of HT and H2 through pipes, vessels, and heat exchangers were importantly considered as main tritium transport paths. In addition, electroyzer and isotope exchange models were developed for analyzing hydrogen production systems including both high-temperature electrolysis and sulfur-iodine process. The TPAC has unlimited flexibility for the system configurations, and provides easy drag-and-drops for making models by adopting a graphical user interface. Verification of the code has been performed by comparisons with the analytical solutions and the experimental data based on the Peach Bottom reactor design. The preliminary results calculated with a former tritium analyses code, THYTAN which was developed in Japan and adopted by Japan Atomic Energy Agency were also compared with the TPAC solutions. This report contains descriptions of the basic tritium pathways, theory, simple user guide, verifications, sensitivity studies, sample cases, and code tutorials. Tritium behaviors in a very high temperature reactor/high temperature steam electrolysis system have been analyzed by the TPAC based on the reference indirect parallel configuration proposed by Oh et al. (2007). This analysis showed that only 0.4% of tritium released from the core is transferred to the product hydrogen

  20. Development of a Consensus Standard for Verification and Validation of Nuclear System Thermal-Fluids Software

    SciTech Connect (OSTI)

    Edwin A. Harvego; Richard R. Schultz; Ryan L. Crane

    2011-12-01

    With the resurgence of nuclear power and increased interest in advanced nuclear reactors as an option to supply abundant energy without the associated greenhouse gas emissions of the more conventional fossil fuel energy sources, there is a need to establish internationally recognized standards for the verification and validation (V&V) of software used to calculate the thermal-hydraulic behavior of advanced reactor designs for both normal operation and hypothetical accident conditions. To address this need, ASME (American Society of Mechanical Engineers) Standards and Certification has established the V&V 30 Committee, under the jurisdiction of the V&V Standards Committee, to develop a consensus standard for verification and validation of software used for design and analysis of advanced reactor systems. The initial focus of this committee will be on the V&V of system analysis and computational fluid dynamics (CFD) software for nuclear applications. To limit the scope of the effort, the committee will further limit its focus to software to be used in the licensing of High-Temperature Gas-Cooled Reactors. In this framework, the Standard should conform to Nuclear Regulatory Commission (NRC) and other regulatory practices, procedures and methods for licensing of nuclear power plants as embodied in the United States (U.S.) Code of Federal Regulations and other pertinent documents such as Regulatory Guide 1.203, 'Transient and Accident Analysis Methods' and NUREG-0800, 'NRC Standard Review Plan'. In addition, the Standard should be consistent with applicable sections of ASME NQA-1-2008 'Quality Assurance Requirements for Nuclear Facility Applications (QA)'. This paper describes the general requirements for the proposed V&V 30 Standard, which includes; (a) applicable NRC and other regulatory requirements for defining the operational and accident domain of a nuclear system that must be considered if the system is to be licensed, (b) the corresponding calculation domain of

  1. Theoretical detection threshold of the proton-acoustic range verification technique

    SciTech Connect (OSTI)

    Ahmad, Moiz; Yousefi, Siavash; Xing, Lei; Xiang, Liangzhong

    2015-10-15

    Purpose: Range verification in proton therapy using the proton-acoustic signal induced in the Bragg peak was investigated for typical clinical scenarios. The signal generation and detection processes were simulated in order to determine the signal-to-noise limits. Methods: An analytical model was used to calculate the dose distribution and local pressure rise (per proton) for beams of different energy (100 and 160 MeV) and spot widths (1, 5, and 10 mm) in a water phantom. In this method, the acoustic waves propagating from the Bragg peak were generated by the general 3D pressure wave equation implemented using a finite element method. Various beam pulse widths (0.1–10 μs) were simulated by convolving the acoustic waves with Gaussian kernels. A realistic PZT ultrasound transducer (5 cm diameter) was simulated with a Butterworth bandpass filter with consideration of random noise based on a model of thermal noise in the transducer. The signal-to-noise ratio on a per-proton basis was calculated, determining the minimum number of protons required to generate a detectable pulse. The maximum spatial resolution of the proton-acoustic imaging modality was also estimated from the signal spectrum. Results: The calculated noise in the transducer was 12–28 mPa, depending on the transducer central frequency (70–380 kHz). The minimum number of protons detectable by the technique was on the order of 3–30 × 10{sup 6} per pulse, with 30–800 mGy dose per pulse at the Bragg peak. Wider pulses produced signal with lower acoustic frequencies, with 10 μs pulses producing signals with frequency less than 100 kHz. Conclusions: The proton-acoustic process was simulated using a realistic model and the minimal detection limit was established for proton-acoustic range validation. These limits correspond to a best case scenario with a single large detector with no losses and detector thermal noise as the sensitivity limiting factor. Our study indicated practical proton

  2. Nuclear Proliferation Using Laser Isotope Separation -- Verification Options

    SciTech Connect (OSTI)

    Erickson, S A

    2001-10-15

    Two levels of nonproliferation verification exist. Signatories of the basic agreements under the Nuclear Non-proliferation Treaty (NPT) agree to open their nuclear sites to inspection by the IAEA. A more detailed and intrusive level was developed following the determination that Iraq had begun a nuclear weapons development program that was not detected by the original level of verification methods. This level, referred to as 93+2 and detailed in model protocol INFCIRC/540, allows the IAEA to do environmental monitoring of non-declared facilities that are suspected of containing proliferation activity, and possibly further inspections, as well as allowing more detailed inspections of declared sites. 56 countries have signed a Strengthened Safeguards Systems Additional Protocol as of 16 July 2001. These additional inspections can be done on the instigation of the IAEA itself, or after requests by other parties to the NPT, based on information that they have collected. Since information able to cause suspicion of proliferation could arrive at any country, it is important that countries have procedures in place that will assist them in making decisions related to these inspections. Furthermore, IAEA inspection resources are limited, and therefore care needs to be taken to make best use of these resources. Most of the nonproliferation verification inspections may be concentrated on establishing that diversion of nuclear materials is not occurring, but some fraction will be related to determining if undeclared sites have nuclear materials production taking place within them. Of these, most suspicions will likely be related to the major existing technologies for uranium enrichment and reprocessing for plutonium extraction, as it would seem most likely that nations attempting proliferation would use tested means of producing nuclear materials. However, as technology continues to advance and new methods of enrichment and reprocessing are developed, inspection

  3. Interview with ARPA-E Acting Director Dr. Cheryl Martin on Platts Energy Week

    SciTech Connect (OSTI)

    Martin, Cheryl; Loveless, Bill

    2014-03-18

    Bill Loveless from Platts Energy Week interviews ARPA-E Acting Director, Dr. Cheryl Martin, about the many transformational energy technologies on display at ARPA-E's 5th annual Energy Innovation Summit.

  4. Interview with ARPA-E Acting Director Dr. Cheryl Martin on Platts Energy Week

    ScienceCinema (OSTI)

    Martin, Cheryl; Loveless, Bill

    2014-04-11

    Bill Loveless from Platts Energy Week interviews ARPA-E Acting Director, Dr. Cheryl Martin, about the many transformational energy technologies on display at ARPA-E's 5th annual Energy Innovation Summit.

  5. Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell

    Broader source: Energy.gov [DOE]

    As part of the blog series celebrating Clean Cities' 20th anniversary, we interviewed Clean Cities Coordinator Melissa Howell to learn how she is helping transition Kentucky off oil.

  6. Exploring the Possible Use of Information Barriers for future Biological Weapons Verification Regimes

    SciTech Connect (OSTI)

    Luke, S J

    2011-12-20

    This report describes a path forward for implementing information barriers in a future generic biological arms-control verification regime. Information barriers have become a staple of discussion in the area of arms control verification approaches for nuclear weapons and components. Information barriers when used with a measurement system allow for the determination that an item has sensitive characteristics without releasing any of the sensitive information. Over the last 15 years the United States (with the Russian Federation) has led on the development of information barriers in the area of the verification of nuclear weapons and nuclear components. The work of the US and the Russian Federation has prompted other states (e.g., UK and Norway) to consider the merits of information barriers for possible verification regimes. In the context of a biological weapons control verification regime, the dual-use nature of the biotechnology will require protection of sensitive information while allowing for the verification of treaty commitments. A major question that has arisen is whether - in a biological weapons verification regime - the presence or absence of a weapon pathogen can be determined without revealing any information about possible sensitive or proprietary information contained in the genetic materials being declared under a verification regime. This study indicates that a verification regime could be constructed using a small number of pathogens that spans the range of known biological weapons agents. Since the number of possible pathogens is small it is possible and prudent to treat these pathogens as analogies to attributes in a nuclear verification regime. This study has determined that there may be some information that needs to be protected in a biological weapons control verification regime. To protect this information, the study concludes that the Lawrence Livermore Microbial Detection Array may be a suitable technology for the detection of the

  7. Interview with ARPA-E: The Future of Semiconductors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interview with ARPA-E: The Future of Semiconductors Interview with ARPA-E: The Future of Semiconductors February 4, 2014 - 10:56am Addthis Learn how wide bandgap semiconductors could impact clean energy technology and our daily lives. | Video by Sarah Gerrity and Matty Greene, Energy Department. Mark D. Mitchell Communications Support Contractor to ARPA-E What are the key facts? ARPA-E's SWITCHES program is focused on making the transmission of electricity more efficient by exploring wide

  8. Test results of NREL 10M, special-purpose family of thin airfoils

    SciTech Connect (OSTI)

    Starcher, K.L.; Nelson, V.C.; Wei, Jun

    1996-12-31

    Two 25 kW Carter Wind Systems were tested to determine performance differences between production blades and rotors with NREL Special Purpose Thin Airfoils. Blade design, mold preparation, blade production, and testing were conducted. Design tools were created for computer modeling of the blade. The blades had the same twist, taper, and length as production blades. Flap natural frequency was adjusted to be as similar as possible between rotors, as was blade mass, blade center of gravity and rotor moment of inertia. Data collected were; wind speed at hub height, blade root flap & edgewise loads, main shaft torque, azimuth position, teeter angle, yaw angle and electrical power. These data were collected at 128 Hertz for data sets of eight seconds. This data set was then written to hard disk and the cycle repeated resulting in a file containing five and one half minutes of data. A data run consisted of; preflight checkout/warm-up of equipment, preflight calibration/verification of all sensors on both turbines, collection of five files of data (about thirty minutes of data), post flight calibration/verification of sensors. During this high speed data collection period there were a total of twenty-four data runs collected. Data were collected for wind speeds in the range about 7, 10 and 13 m/s. A data matrix was filled for clean, medium and heavy surface roughness. Baseline power curves, parametric pitch variation runs to establish testing pitch settings, high speed data collection runs with and without applied surface roughness were completed and analyzed. Data were compared using simple arithmetic mean, Fast Fourier Transform (FFT) analysis, rainflow counting algorithms and wavelet analysis. The NREL airfoils showed much less sensitivity to surface roughness. There were minimal root bending load differences. Annual energy production during long term operation is being determined. 9 refs., 7 figs.

  9. ON THE VERIFICATION AND VALIDATION OF GEOSPATIAL IMAGE ANALYSIS ALGORITHMS

    SciTech Connect (OSTI)

    Roberts, Randy S.; Trucano, Timothy G.; Pope, Paul A.; Aragon, Cecilia R.; Jiang , Ming; Wei, Thomas; Chilton, Lawrence; Bakel, A. J.

    2010-07-25

    Verification and validation (V&V) of geospatial image analysis algorithms is a difficult task and is becoming increasingly important. While there are many types of image analysis algorithms, we focus on developing V&V methodologies for algorithms designed to provide textual descriptions of geospatial imagery. In this paper, we present a novel methodological basis for V&V that employs a domain-specific ontology, which provides a naming convention for a domain-bounded set of objects and a set of named relationship between these objects. We describe a validation process that proceeds through objectively comparing benchmark imagery, produced using the ontology, with algorithm results. As an example, we describe how the proposed V&V methodology would be applied to algorithms designed to provide textual descriptions of facilities

  10. Scope and verification of a Fissile Material (Cutoff) Treaty

    SciTech Connect (OSTI)

    Hippel, Frank N. von

    2014-05-09

    A Fissile Material Cutoff Treaty (FMCT) would ban the production of fissile material - in practice highly-enriched uranium and separated plutonium - for weapons. It has been supported by strong majorities in the United Nations. After it comes into force, newly produced fissile materials could only be produced under international - most likely International Atomic Energy Agency - monitoring. Many non-weapon states argue that the treaty should also place under safeguards pre-existing stocks of fissile material in civilian use or declared excess for weapons so as to make nuclear-weapons reductions irreversible. This paper discusses the scope of the FMCT, the ability to detect clandestine production and verification challenges in the nuclear-weapons states.

  11. The DES Science Verification Weak Lensing Shear Catalogs

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Jarvis, M.

    2016-05-01

    We present weak lensing shear catalogs for 139 square degrees of data taken during the Science Verification (SV) time for the new Dark Energy Camera (DECam) being used for the Dark Energy Survey (DES). We describe our object selection, point spread function estimation and shear measurement procedures using two independent shear pipelines, IM3SHAPE and NGMIX, which produce catalogs of 2.12 million and 3.44 million galaxies respectively. We also detail a set of null tests for the shear measurements and find that they pass the requirements for systematic errors at the level necessary for weak lensing science applications using the SVmore » data. Furthermore, we discuss some of the planned algorithmic improvements that will be necessary to produce sufficiently accurate shear catalogs for the full 5-year DES, which is expected to cover 5000 square degrees.« less

  12. Shell Element Verification & Regression Problems for DYNA3D

    SciTech Connect (OSTI)

    Zywicz, E

    2008-02-01

    A series of quasi-static regression/verification problems were developed for the triangular and quadrilateral shell element formulations contained in Lawrence Livermore National Laboratory's explicit finite element program DYNA3D. Each regression problem imposes both displacement- and force-type boundary conditions to probe the five independent nodal degrees of freedom employed in the targeted formulation. When applicable, the finite element results are compared with small-strain linear-elastic closed-form reference solutions to verify select aspects of the formulations implementation. Although all problems in the suite depict the same geometry, material behavior, and loading conditions, each problem represents a unique combination of shell formulation, stabilization method, and integration rule. Collectively, the thirty-six new regression problems in the test suite cover nine different shell formulations, three hourglass stabilization methods, and three families of through-thickness integration rules.

  13. The DES Science Verification Weak Lensing Shear Catalogs

    SciTech Connect (OSTI)

    Jarvis, M.

    2015-07-20

    We present weak lensing shear catalogs for 139 square degrees of data taken during the Science Verification (SV) time for the new Dark Energy Camera (DECam) being used for the Dark Energy Survey (DES). We describe our object selection, point spread function estimation and shear measurement procedures using two independent shear pipelines, IM3SHAPE and NGMIX, which produce catalogs of 2.12 million and 3.44 million galaxies respectively. We also detail a set of null tests for the shear measurements and find that they pass the requirements for systematic errors at the level necessary for weak lensing science applications using the SV data. Furthermore, we discuss some of the planned algorithmic improvements that will be necessary to produce sufficiently accurate shear catalogs for the full 5-year DES, which is expected to cover 5000 square degrees.

  14. Verification study of an emerging fire suppression system

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Cournoyer, Michael E.; Waked, R. Ryan; Granzow, Howard N.; Gubernatis, David C.

    2016-01-01

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Moreover, plutonium gloveboxes present harsh environmental conditions for polymer materials; these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. Several studies have been conducted to determine the robustness of selfcontained fire extinguishers in plutonium gloveboxes in a nuclear facility, verification tests must be performed. These tests include activation and mass loss calorimeter tests. In addition, compatibility issues with chemical components of the self-contained fire extinguishers need to be addressed. Our study presents activation andmore » mass loss calorimeter test results. After extensive studies, no critical areas of concern have been identified for the plutonium glovebox application of Fire Foe™, except for glovebox operations that use large quantities of bulk plutonium or uranium metal such as metal casting and pyro-chemistry operations.« less

  15. Verification study of an emerging fire suppression system

    SciTech Connect (OSTI)

    Cournoyer, Michael E.; Waked, R. Ryan; Granzow, Howard N.; Gubernatis, David C.

    2016-01-01

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Moreover, plutonium gloveboxes present harsh environmental conditions for polymer materials; these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. Several studies have been conducted to determine the robustness of selfcontained fire extinguishers in plutonium gloveboxes in a nuclear facility, verification tests must be performed. These tests include activation and mass loss calorimeter tests. In addition, compatibility issues with chemical components of the self-contained fire extinguishers need to be addressed. Our study presents activation and mass loss calorimeter test results. After extensive studies, no critical areas of concern have been identified for the plutonium glovebox application of Fire Foe™, except for glovebox operations that use large quantities of bulk plutonium or uranium metal such as metal casting and pyro-chemistry operations.

  16. Public-key data authentication for treaty verification

    SciTech Connect (OSTI)

    Draelos, T.J.; Goldsmith, S.Y.

    1992-08-01

    A public-key Treaty Data Authentication Module (TDAM) based on the National Institute of Standards and Technology (NIST) Digital Signature Standard (DSS) has been developed to support treaty verification systems. The TDAM utilizes the Motorola DSP56001 Digital Signal Processor as a coprocessor and supports both the STD Bus and PC-AT Bus platforms. The TDAM is embedded within an Authenticated Data Communication Subsystem (ADCS) which provides transparent data authentication and communications, thereby concealing the details of securely authenticating and communicating compliance data and commands. The TDAM has been designed according to the NIST security guidelines for cryptographic modules. Public-key data authentication is important for support of both bilateral and multi-lateral treaties. 8 refs.

  17. Public-key data authentication for treaty verification

    SciTech Connect (OSTI)

    Draelos, T.J.; Goldsmith, S.Y.

    1992-01-01

    A public-key Treaty Data Authentication Module (TDAM) based on the National Institute of Standards and Technology (NIST) Digital Signature Standard (DSS) has been developed to support treaty verification systems. The TDAM utilizes the Motorola DSP56001 Digital Signal Processor as a coprocessor and supports both the STD Bus and PC-AT Bus platforms. The TDAM is embedded within an Authenticated Data Communication Subsystem (ADCS) which provides transparent data authentication and communications, thereby concealing the details of securely authenticating and communicating compliance data and commands. The TDAM has been designed according to the NIST security guidelines for cryptographic modules. Public-key data authentication is important for support of both bilateral and multi-lateral treaties. 8 refs.

  18. The new geospatial tools: global transparency enhancing safeguards verification

    SciTech Connect (OSTI)

    Pabian, Frank Vincent

    2010-09-16

    This paper focuses on the importance and potential role of the new, freely available, geospatial tools for enhancing IAEA safeguards and how, together with commercial satellite imagery, they can be used to promote 'all-source synergy'. As additional 'open sources', these new geospatial tools have heralded a new era of 'global transparency' and they can be used to substantially augment existing information-driven safeguards gathering techniques, procedures, and analyses in the remote detection of undeclared facilities, as well as support ongoing monitoring and verification of various treaty (e.g., NPT, FMCT) relevant activities and programs. As an illustration of how these new geospatial tools may be applied, an original exemplar case study provides how it is possible to derive value-added follow-up information on some recent public media reporting of a former clandestine underground plutonium production complex (now being converted to a 'Tourist Attraction' given the site's abandonment by China in the early 1980s). That open source media reporting, when combined with subsequent commentary found in various Internet-based Blogs and Wikis, led to independent verification of the reporting with additional ground truth via 'crowdsourcing' (tourist photos as found on 'social networking' venues like Google Earth's Panoramio layer and Twitter). Confirmation of the precise geospatial location of the site (along with a more complete facility characterization incorporating 3-D Modeling and visualization) was only made possible following the acquisition of higher resolution commercial satellite imagery that could be correlated with the reporting, ground photos, and an interior diagram, through original imagery analysis of the overhead imagery.

  19. Metals Verification Study for Sinclair and Dyes Inlets,Washington

    SciTech Connect (OSTI)

    Kohn, Nancy P.; Miller, Martin C.; Brandenberger, Jill M.; Johnston, Robert K.

    2004-09-29

    Sinclair and Dyes Inlets near Bremerton, Washington, are on the State of Washington's 1998 303(d) list of impaired waters because of fecal coliform contamination in marine water, metals in sediment and fish tissue, and organics in sediment and fish tissue. This Metals Verification Study was conducted to address the 303(d) segments that are listed for metal contaminants in marine sediment, because significant cleanup and source control activities have been conducted in the Inlets since the data supporting the 1998 303(d) listings were collected. The study was designed to obtain present-day sediment metals concentrations throughout Sinclair Inlet, Dyes Inlet, Port Orchard Passage, and Rich Passage, with stations spatially distributed to support 303(d) listing updates and also watershed-level water quality and contaminant transport modeling efforts. A total of 160 surface sediment samples from Sinclair Inlet, Dyes Inlet, Port Orchard Passage, and Rich Passage were screened for copper, lead, and zinc using X-Ray Fluorescence (XRF). 40 samples (25%) were selected for confirmatory metals analysis by ICP-MS for cadmium, silver, and arsenic in addition to copper, lead, and zinc. Regression relationships between the ICP-MS and XRF datasets were developed to estimate copper, lead, and zinc concentrations in all samples. The XRF results for copper, lead, and zinc correlated well with ICP-MS results, and predicted concentrations were calculated for all samples. The results of the Metals Verification Study show that sediment quality in Sinclair Inlet has improved markedly since implementation of cleanup and source control actions, and that the distribution of residual contaminants is limited to nearshore areas already within the actively managed Puget Sound Naval Shipyard Superfund Site where further source control actions and monitoring are under way. Outside of Sinclair Inlet, the target metals met state sediment quality standards.

  20. Coupled reactive mass transport and fluid flow: Issues in model verification

    SciTech Connect (OSTI)

    Freedman, Vicky L.; Ibaraki, Motomu

    2003-01-03

    Model verification and validation are both important steps in the development of reactive transport models. In this paper, a distinction is made between verification and validation, and the focus is on codifying the issues of verification for a numerical, reactive transport flow model. First, the conceptual basis of model verification is reviewed, which shows that verification should be understood as a first step in model development, and be followed by a protocol that assures that the model accurately represents system behavior. Second, commonly used procedures and methods of model verification are presented. In the third part of this paper, an intercomparison of models is used to demonstrate that model verification can be performed despite differences in hydrogeochemical transport code formulations. Results of an example simulation of transport are presented in which the numerical model is tested against other hydrogeochemical codes. Different kinetic formulations between solid and aqueous phases used among numerical models complicates model verification. This test problem involves uranium transport under conditions of varying pH and oxidation potential, with reversible precipitation of calcium uranate and coffinite. Results between the different hydrogeochemical transport codes show differences in oxidation potentials, but similarities in mineral assemblages and aqueous transport patterns. Because model verification can be further complicated by differences in the approach for solving redox problems, a comparison of a fugacity approach to both the external approach (based on hypothetical electron activity) and effective internal approach (based on conservation of electrons) is performed. The comparison demonstrates that the oxygen fugacity approach produces different redox potentials and mineral assemblages than both the effective internal and external approaches.

  1. ARM - Field Campaign - Verification of the Origins of Rotation in Tornadoes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment (VORTEX) govCampaignsVerification of the Origins of Rotation in Tornadoes Experiment (VORTEX) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Verification of the Origins of Rotation in Tornadoes Experiment (VORTEX) 1995.04.01 - 1995.05.31 Lead Scientist : Ed Westwater For data sets, see below. Abstract Joint Verification of the Origins of Rotation in Tornadoes Experiment (VORTEX) -ARM

  2. INDEPENDENT VERIFICATION OF THE BUILDING 3550 SLAB AT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-05-08

    The Oak Ridge Institute for Science and Education (ORISE) has completed the independent verification survey of the Building 3550 Slab. The results of this effort are provided. The objective of this verification survey is to provide independent review and field assessment of remediation actions conducted by Safety and Ecology Corporation (SEC) to document that the final radiological condition of the slab meets the release guidelines. Verification survey activities on the Building 3550 Slab that included scans, measurements, and the collection of smears. Scans for alpha, alpha plus beta, and gamma activity identified several areas that were investigated.

  3. System for Analysis of Soil-Structure Interaction (SASSI) Verification &

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validation (V&V) Problem Set | Department of Energy System for Analysis of Soil-Structure Interaction (SASSI) Verification & Validation (V&V) Problem Set System for Analysis of Soil-Structure Interaction (SASSI) Verification & Validation (V&V) Problem Set System for Analysis of Soil-Structure Interaction (SASSI) Verification & Validation (V&V) Problem Set SASSI is the System for Analysis of Soil-Structure Interaction, a computer code for performing finite element

  4. M&V Guidelines: Measurement and Verification for Performance-Based

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contracts (Version 4.0) | Department of Energy You are here Home » M&V Guidelines: Measurement and Verification for Performance-Based Contracts (Version 4.0) M&V Guidelines: Measurement and Verification for Performance-Based Contracts (Version 4.0) Document outlines the Federal Energy Management Program's standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers. Download the M&V

  5. Electronic multi-purpose material level sensor

    DOE Patents [OSTI]

    McEwan, T.E.

    1997-03-11

    The present electronic multi-purpose material level sensor is based on time domain reflectometry (TDR) of very short electrical pulses. Pulses are propagated along a transmission line that is partially immersed in a liquid, powder, or other substance such as grain in a silo. The time difference of the reflections at the start of the transmission line and the air/liquid interface are used to determine levels to better than 0.01 inch. The sensor is essentially independent of circuit element and temperature variations, and can be mass produced at an extremely low price. The transmission line may be a Goubau line, microstrip, coaxial cable, twin lead, CPS or CPW, and may typically be a strip placed along the inside wall of a tank. The reflected pulses also contain information about strata within the liquid such as sludge-build-up at the bottom of an oil tank. 9 figs.

  6. Electronic multi-purpose material level sensor

    DOE Patents [OSTI]

    McEwan, Thomas E.

    1997-01-01

    The present electronic multi-purpose material level sensor is based on time domain reflectometry (TDR) of very short electrical pulses. Pulses are propagated along a transmission line that is partially immersed in a liquid, powder, or other substance such as grain in a silo. The time difference of the reflections at the start of the transmission line and the air/liquid interface are used to determine levels to better than 0.01 inch. The sensor is essentially independent of circuit element and temperature variations, and can be mass produced at an extremely low price. The transmission line may be a Goubau line, microstrip, coaxial cable, twin lead, CPS or CPW, and may typically be a strip placed along the inside wall of a tank. The reflected pulses also contain information about strata within the liquid such as sludge-build-up at the bottom of an oil tank.

  7. SU-C-16A-01: In Vivo Source Position Verification in High Dose Rate (HDR) Prostate Brachytherapy Using a Flat Panel Imager: Initial Clinical Experience

    SciTech Connect (OSTI)

    Franich, R; Smith, R; Millar, J; Haworth, A; Taylor, M; McDermott, L

    2014-06-15

    Purpose: We report our initial clinical experience with a novel position-sensitive source-tracking system based on a flat panel imager. The system has been trialled with 4 prostate HDR brachytherapy patients (8 treatment fractions) in this initial study. Methods: The flat panel imaging system was mounted under a customised carbon fibre couch top assembly (Figure 1). Three gold fiducial markers were implanted into the prostate of each patient at the time of catheter placement. X-ray dwell position markers were inserted into three catheters and a radiograph acquired to locate the implant relative to the imaging device. During treatment, as the HDR source dwells were delivered, images were acquired and processed to determine the position of the source in the patient. Source positions measured by the imaging device were compared to the treatment plan for verification of treatment delivery. Results: Measured dwell positions provided verification of relative dwell spacing within and between catheters, in the coronal plane. Measurements were typically within 2.0mm (0.2mm – 3.3mm, s.d. 0.8mm) of the planned positions over 60 dwells (Figure 2). Discrimination between larger dwell intervals and catheter differentiation were clear. This confirms important delivery attributes such as correct transfer tube connection, source step size, relative catheter positions and therefore overall correct plan selection and delivery. The fiducial markers, visible on the radiograph, provided verification of treatment delivery to the correct anatomical location. The absolute position of the dwells was determined by comparing the measured dwell positions with the x-ray markers from the radiograph, validating the programmed treatment indexer length. The total impact on procedure time was less than 5 minutes. Conclusion: The novel, noninvasive HDR brachytherapy treatment verification system was used clinically with minor impact on workflow. The system allows verification of correct treatment

  8. Field Scale Test and Verification of CHP System at the Ritz Carlton, San Francisco, August 2007

    Broader source: Energy.gov [DOE]

    ITP Industrial Distributed Energy: National Account Energy Alliance Final Report for the Field Scale Test and Verification of a PureComfort® 240M Combined Heat and Power System at the Ritz Carlton, San Francisco

  9. Better Buildings Alliance, Advanced Rooftop Unit Campaign: Rooftop Unit Measurement and Verification (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    This document provides facility managers and building owners an introduction to measurement and verification (M&V) methods to estimate energy and cost savings of rooftop units replacement or retrofit projects to estimate paybacks or to justify future projects.

  10. Draft M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0)

    Broader source: Energy.gov [DOE]

    Document describes the Federal Energy Management Program's (FEMP) standard procedures and guidelines for measurement and verification (M&V) for federal, state, and local government energy managers and procurement officials and utility and energy service providers.

  11. M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 3.0)

    Broader source: Energy.gov [DOE]

    Document describes the Federal Energy Management Program's (FEMP) standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers.

  12. Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft Process Document

    Broader source: Energy.gov [DOE]

    On April 22, 2011, The U.S. Department of Energy (DOE) released a draft of DOE's Verification Testing in Support of ENERGY STAR Process Plan for 2011. DOE accepted comments through May 9, 2011 and...

  13. Independent Verification Survey Report for the Operable Unit-1 Miamisburg Closure Project, Miamisburg, OH

    SciTech Connect (OSTI)

    Weaver, P.

    2008-03-17

    The objectives of the independent verification survey were to confirm that remedial actions have been effective in meeting established release criteria and that documentation accurately and adequately describes the current radiological and chemical conditions of the MCP site.

  14. 2013 MCNP6 Verification Study for the MCNPX_65 and MCNPX_EXTENDED...

    Office of Scientific and Technical Information (OSTI)

    the MCNPX65 and MCNPXEXTENDED Test Sets. March 14, 2013 Citation Details In-Document Search Title: 2013 MCNP6 Verification Study for the MCNPX65 and MCNPXEXTENDED Test Sets. ...

  15. System maintenance verification and validation plan for the TWRS controlled baseline database system

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    TWRS Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the verification and validation approach for system documentation changes within the database system.

  16. Method and computer product to increase accuracy of time-based software verification for sensor networks

    DOE Patents [OSTI]

    Foo Kune, Denis; Mahadevan, Karthikeyan

    2011-01-25

    A recursive verification protocol to reduce the time variance due to delays in the network by putting the subject node at most one hop from the verifier node provides for an efficient manner to test wireless sensor nodes. Since the software signatures are time based, recursive testing will give a much cleaner signal for positive verification of the software running on any one node in the sensor network. In this protocol, the main verifier checks its neighbor, who in turn checks its neighbor, and continuing this process until all nodes have been verified. This ensures minimum time delays for the software verification. Should a node fail the test, the software verification downstream is halted until an alternative path (one not including the failed node) is found. Utilizing techniques well known in the art, having a node tested twice, or not at all, can be avoided.

  17. General Purpose Energy Storage (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    General Purpose Energy Storage Citation Details In-Document Search Title: General Purpose Energy Storage You are accessing a document from the Department of Energy's (DOE) ...

  18. Verification and Validation of Digitally Upgraded Control Rooms

    SciTech Connect (OSTI)

    Boring, Ronald; Lau, Nathan

    2015-09-01

    As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cycles of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation—which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design—early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current practice

  19. Measurement and Verification of Energy Savings and Performance from Advanced Lighting Controls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SA-25222 Measurement and Verification of Energy Savings and Performance from Advanced Lighting Controls February 2016 EE Richman PNNL-SA-25222 Measurement and Verification of Energy Savings and Performance from Advanced Lighting Controls EE Richman February 2016 Prepared for the U.S. Department of Energy Federal Energy Management Program under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 iii Contacts Project Manager Linda Sandahl Pacific Northwest

  20. Guide to Government Witnessing and Review of Measurement and Verification Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government Witnessing r. 3/28/2014 1 Guide to Government Witnessing and Review of Measurement and Verification Activities Rev. 3/28/2014 1. Introduction This document provides guidance pertaining to government witnessing of measurement and verification (M&V) activities in federal energy savings performance contract (ESPC) projects. The U.S. Department of Energy's Federal Energy Management Program (FEMP) recommends that government staff witness the M&V activities that are carried out by

  1. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Measurement and Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1. MEASUREMENT & VERIFICATION 11.1 Agencies should designate a primary contact who is responsible for (1) maintaining contact with FEMP through the Life of Contract program, and (2) maintaining continuity of documentation and awareness of the ESPC throughout the performance period. 11.2 Agencies should designate a government witness to accompany the ESCO during annual measurement and verification activities. Ensure that the government witness has reviewed current FEMP guidance on M&V

  2. Hanford Site Assessment & Characterization/Verification of Structures & Conex Boxes Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Revision 1 Hanford Site Assessment & Characterization/Verification of Structures & Conex Boxes Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0342-004, Rev. 1 Hanford Site Wide Assessment & Characterization/Verification of Structures & Conex Boxes Procedure Published Date: 09/08/15 Effective Date: 09/25/15 ii CHANGE SUMMARY Rev # Date - Section Changed Change

  3. "What's New with Independent Verification at Department of Energy Sites" |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy "What's New with Independent Verification at Department of Energy Sites" "What's New with Independent Verification at Department of Energy Sites" Sarah Roberts*, Oak Ridge Associated Universities ; Edward Regnier, U.S. Department of Energy; Tim Vitkus, Oak Ridge Associated Universities; Alexander Williams, U.S. Department of Energy Abstract: Recent rulemaking by the U.S. Department of Energy (DOE) has formalized the requirements for independent

  4. Assessment of Advanced Measurement and Verification Methods (M&V 2.0) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Assessment of Advanced Measurement and Verification Methods (M&V 2.0) Assessment of Advanced Measurement and Verification Methods (M&V 2.0) Automated M&V from Noesis Automated M&V from Noesis Lead Performer: Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Project Partners: -- Quantum Energy Services & Technology -- Pacific Gas & Electric -- Consortium for Energy Efficiency FY16 DOE Funding: $410,000 Project Term: November 1, 2013 -

  5. Verification of Shell GTL Fuel as CARB Alternative Diesel | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Verification of Shell GTL Fuel as CARB Alternative Diesel Verification of Shell GTL Fuel as CARB Alternative Diesel Presentation given at the 2007 Diesel Engine-Efficiency & Emissions Research Conference (DEER 2007). 13-16 August, 2007, Detroit, Michigan. Sponsored by the U.S. Department of Energy's (DOE) Office of FreedomCAR and Vehicle Technologies (OFCVT). deer07_dahlstrom.pdf (684.84 KB) More Documents & Publications Rigorous HDD Emissions Capabilities of Shell GTL Fuel

  6. California ARB Verification Testing of the CBSTM Soot Filter for Stationary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diesel Applications | Department of Energy California ARB Verification Testing of the CBSTM Soot Filter for Stationary Diesel Applications California ARB Verification Testing of the CBSTM Soot Filter for Stationary Diesel Applications 2005 Diesel Engine Emissions Reduction (DEER) Conference Presentations and Posters 2005_deer_newburry1.pdf (655.07 KB) More Documents & Publications MobiCleanTM Soot Filter for Diesel Locomotiive Applications Retrofit and Testing of a Pre-Turbo, Diesel

  7. US and UK discuss efforts to improve technical verification of nuclear

    National Nuclear Security Administration (NNSA)

    disarmament | National Nuclear Security Administration | (NNSA) US and UK discuss efforts to improve technical verification of nuclear disarmament Tuesday, May 6, 2014 - 5:06pm Reaching President Obama's goal of a world without nuclear weapons requires overcoming technical challenges in verifying disarmament. For more than a decade, the U.S. and U.K. have worked together to improve technical verification-an endeavor that balances the need to protect classified and sensitive information with

  8. SU-E-J-138: On the Ion Beam Range and Dose Verification in Hadron Therapy Using Sound Waves

    SciTech Connect (OSTI)

    Fourkal, E; Veltchev, I; Gayou, O; Nahirnyak, V

    2015-06-15

    Purpose: Accurate range verification is of great importance to fully exploit the potential benefits of ion beam therapies. Current research efforts on this topic include the use of PET imaging of induced activity, detection of emerging prompt gamma rays or secondary particles. It has also been suggested recently to detect the ultrasound waves emitted through the ion energy absorption process. The energy absorbed in a medium is dissipated as heat, followed by thermal expansion that leads to generation of acoustic waves. By using an array of ultrasound transducers the precise spatial location of the Bragg peak can be obtained. The shape and intensity of the emitted ultrasound pulse depend on several variables including the absorbed energy and the pulse length. The main objective of this work is to understand how the ultrasound wave amplitude and shape depend on the initial ion energy and intensity. This would help guide future experiments in ionoacoustic imaging. Methods: The absorbed energy density for protons and carbon ions of different energy and field sizes were obtained using Fluka Monte Carlo code. Subsequently, the system of coupled equations for temperature and pressure is solved for different ion pulse intensities and lengths to obtain the pressure wave shape, amplitude and spectral distribution. Results: The proposed calculations show that the excited pressure wave amplitude is proportional to the absorbed energy density and for longer ion pulses inversely proportional to the ion pulse duration. It is also shown that the resulting ionoacoustic pressure distribution depends on both ion pulse duration and time between the pulses. Conclusion: The Bragg peak localization using ionoacoustic signal may eventually lead to the development of an alternative imaging method with sub-millimeter resolution. It may also open a way for in-vivo dose verification from the measured acoustic signal.

  9. Simulated Verification of Fuel Element Inventory in a Small Reactor Core Using the Nuclear Materials Identification System (NMIS)

    SciTech Connect (OSTI)

    Grogan, Brandon R; Mihalczo, John T

    2009-01-01

    The International Panel on Climate Change projects that by 2050 the world energy demand may double. Although the primary focus for new nuclear power plants in industrialized nations is on large plants in the 1000-1600 MWe range, there is an increasing demand for small and medium reactors (SMRs). About half of the innovative SMR concepts are for small (<300 MWe) reactors with a 5-30 year life without on-site refueling. This type of reactor is also known as a battery-type reactor. These reactors are particularly attractive to countries with small power grids and for non-electrical purposes such as heating, hydrogen production, and seawater desalination. Traditionally, this type of reactor has been used in a nautical propulsion role. This type of reactor is designed as a permanently sealed unit to prevent the diversion of the uranium in the core by the user. However, after initial fabrication it will be necessary to verify that the newly fabricated reactor core contains the quantity of uranium that initially entered the fuel fabrication plant. In most instances, traditional inspection techniques can be used to perform this verification, but in certain situations the core design will be considered sensitive. Non-intrusive verification techniques must be utilized in these situations. The Nuclear Materials Identification System (NMIS) with imaging uses active interrogation and a fast time correlation processor to characterize fissile material. The MCNP-PoliMi computer code was used to simulate NMIS measurements of a small, sealed reactor core. Because most battery-type reactor designs are still in the early design phase, a more traditional design based on a Russian icebreaker core was used in the simulations. These simulations show how the radiography capabilities of the NMIS could be used to detect the diversion of fissile material by detecting void areas in the assembled core where fuel elements have been removed.

  10. MO-F-16A-01: Implementation of MPPG TPS Verification Tests On Various Accelerators

    SciTech Connect (OSTI)

    Smilowitz, J; Bredfeldt, J; Geurts, M; Miller, J

    2014-06-15

    Purpose: To demonstrate the implementation of the Medical Physics Practice Guideline (MPPG) for dose calculation and beam parameters verification of treatment planning systems (TPS). Methods: We implemented the draft TPS MPPG for three linacs: Varian Trilogy, TomoHDA and Elekta Infinity. Static and modulated test plans were created. The static fields are different than used in commissioning. Data was collected using ion chambers and diodes in a scanning water tank, Delta4 phantom and a custom phantom. MatLab and Microsoft Excel were used to create analysis tools to compare reference DICOM dose with scan data. This custom code allowed for the interpolation, registration and gamma analysis of arbitrary dose profiles. It will be provided as open source code. IMRT fields were validated with Delta4 registration and comparison tools. The time for each task was recorded. Results: The tests confirmed the strengths, and revealed some limitations, of our TPS. The agreement between calculated and measured dose was reported for all beams. For static fields, percent depth dose and profiles were analyzed with criteria in the draft MPPG. The results reveal areas of slight mismatch with the model (MLC leaf penumbra, buildup region.) For TomoTherapy, the IMRT plan 2%/2 mm gamma analysis revealed poorest agreement in the low dose regions. For one static test plan for all 10MV Trilogy photon beams, the plan generation, scan queue creation, data collection, data analysis and report took 2 hours, excluding tank setup. Conclusions: We have demonstrated the implementation feasibility of the TPS MPPG. This exercise generated an open source tool for dose comparisons between scan data and DICOM dose data. An easily reproducible and efficient infrastructure with streamlined data collection was created for repeatable robust testing of the TPS. The tests revealed minor discrepancies in our models and areas for improvement that are being investigated.

  11. SU-GG-T-49: Real Time Dose Verification for Novel Shielded Balloon Brachytherapy

    SciTech Connect (OSTI)

    Govindarajan, Nandakarthik; Nazaryan, Vahagn; Gueye, Paul; Keppel, Cynthia

    2010-06-01

    Purpose: The validation of a novel approach for reducing skindoses to an acceptable level during Accelerated Partial Breast Irradiation (APBI) when the balloon-to-skin distance is inadequate (less than 7 mm) is reported. The study uses a real time dose verification method for a metallic shielded balloon applicator using scintillation fiber technology. Method and Materials: Partial shielding of the radiationdose to the skin using iron or other ferrous powder could enable the extension of APBI to some patients. With small external and pre-determined magnetic fields (

  12. In vivo real-time dosimetric verification in high dose rate prostate brachytherapy

    SciTech Connect (OSTI)

    Seymour, Erin L.; Downes, Simon J.; Fogarty, Gerald B.; Izard, Michael A.; Metcalfe, Peter

    2011-08-15

    Purpose: To evaluate the performance of a diode array in the routine verification of planned dose to points inside the rectum from prostate high dose rate (HDR) brachytherapy using a real-time planning system. Methods: A dosimetric study involving 28 patients was undertaken where measured doses received during treatment were compared to those calculated by the treatment planning system (TPS). After the ultrasound imaging required for treatment planning had been recorded, the ultrasound probe was replaced with a geometric replica that contained an 8 mm diameter cylindrical cavity in which a PTW diode array type 9112 was placed. The replica probe was then positioned inside the rectum with the individual diode positions determined using fluoroscopy. Dose was then recorded during the patients' treatment and compared to associated coordinates in the planning system. Results: Factors influencing diode response and experimental uncertainty were initially investigated to estimate the overall uncertainty involved in dose measurements, which was determined to be {+-}10%. Data was acquired for 28 patients' first fractions, 11 patients' second fractions, and 13 patients' third fractions with collection dependent upon circumstances. Deviations between the diode measurements and predicted values ranged from -42% to +35% with 71% of measurements experiencing less than a 10% deviation from the predicted values. If the {+-}10% measurement uncertainty was combined with a tolerated dose discrepancy of {+-}10% then over 95% of the diode results exhibited agreement with the calculated data to within {+-}20%. It must also be noted that when large dose discrepancies were apparent they did not necessarily occur for all five diodes in the one measurement. Conclusions: This technique provided a method that could be utilized to detect gross errors in dose delivery of a real-time prostate HDR plan. Limitations in the detection system used must be well understood if meaningful results are to

  13. The independent verification process in decommissioning, decontamination, and reutilization activities - description, benefits, and lessons learned

    SciTech Connect (OSTI)

    Egidi, P.V.

    1997-06-01

    Oak Ridge National Laboratory Environmental Technology Section has been performing Independent Verification (IV) activities for U.S. DOE sites since 1986. DOE has successfully used IV in the Uranium Mill Tailings Remedial Action Program, Decontamination and Decommissioning projects, and Formerly Utilized Sites Remedial Action Projects/Surplus Facilities Management Program. Projects that have undergone IV range from small residential properties to large, industrial sites. The IV process provides a third-party review conducted by an independent organization. The purpose is to verify accuracy and completeness of contractor field measurements and final documentation, evaluate the credibility of procedures, and independently assess post-cleanup conditions versus decommissioning project plans and release criteria. Document reviews of plans, dose models, procedures, and reports are some IV activities undertaken. Independent measurements are also collected during field visits to confirm the contractor`s findings. Corrective actions for discrepancies are suggested if necessary. Finally, archival and reporting of the final site environmental conditions for project closeout and certification are completed. The IV contractor reports to DOE headquarters and acts as a quality assurance feedback mechanism. An IV also provides additional assurance that projects are planned, carried out, and documented properly. Decommissioning projects benefit from the IV process by: (1) cost and time savings from early identification of potential problems, (2) assurance that cleanup meets regulatory guidelines, and (3) technical reviews and consultation with experts in field instrumentation, sampling strategy, etc. Some lessons learned from the IV process include avoiding: (1) improper survey techniques, (2) reporting data in units not comparable with guideline values, (3) premature release of surfaces, (4) poor decommissioning project planning, (5) misapplication of release guidelines. 20 refs.

  14. SU-D-18A-02: Towards Real-Time On-Board Volumetric Image Reconstruction for Intrafraction Target Verification in Radiation Therapy

    SciTech Connect (OSTI)

    Xu, X; Iliopoulos, A; Zhang, Y; Pitsianis, N; Sun, X; Yin, F; Ren, L

    2014-06-01

    Purpose: To expedite on-board volumetric image reconstruction from limited-angle kVMV projections for intrafraction verification. Methods: A limited-angle intrafraction verification (LIVE) system has recently been developed for real-time volumetric verification of moving targets, using limited-angle kVMV projections. Currently, it is challenged by the intensive computational load of the prior-knowledge-based reconstruction method. To accelerate LIVE, we restructure the software pipeline to make it adaptable to model and algorithm parameter changes, while enabling efficient utilization of rapidly advancing, modern computer architectures. In particular, an innovative two-level parallelization scheme has been designed: At the macroscopic level, data and operations are adaptively partitioned, taking into account algorithmic parameters and the processing capacity or constraints of underlying hardware. The control and data flows of the pipeline are scheduled in such a way as to maximize operation concurrency and minimize total processing time. At the microscopic level, the partitioned functions act as independent modules, operating on data partitions in parallel. Each module is pre-parallelized and optimized for multi-core processors (CPUs) and graphics processing units (GPUs). Results: We present results from a parallel prototype, where most of the controls and module parallelization are carried out via Matlab and its Parallel Computing Toolbox. The reconstruction is 5 times faster on a data-set of twice the size, compared to recently reported results, without compromising on algorithmic optimization control. Conclusion: The prototype implementation and its results have served to assess the efficacy of our system concept. While a production implementation will yield much higher processing rates by approaching full-capacity utilization of CPUs and GPUs, some mutual constraints between algorithmic flow and architecture specifics remain. Based on a careful analysis of

  15. Weak lensing by galaxy troughs in DES Science Verification data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Gruen, D.; Friedrich, O.; Amara, A.; Bacon, D.; Bonnett, C.; Hartley, W.; Jain, B.; M. Jarvis; Kavprzak, T.; Krause, E.; et al

    2015-11-29

    In this study, we measure the weak lensing shear around galaxy troughs, i.e. the radial alignment of background galaxies relative to underdensities in projections of the foreground galaxy field over a wide range of redshift in Science Verification data from the Dark Energy Survey. Our detection of the shear signal is highly significant (10σ–15σ for the smallest angular scales) for troughs with the redshift range z ϵ [0.2, 0.5] of the projected galaxy field and angular diameters of 10 arcmin…1°. These measurements probe the connection between the galaxy, matter density, and convergence fields. By assuming galaxies are biased tracers ofmore » the matter density with Poissonian noise, we find agreement of our measurements with predictions in a fiducial Λ cold dark matter model. The prediction for the lensing signal on large trough scales is virtually independent of the details of the underlying model for the connection of galaxies and matter. Our comparison of the shear around troughs with that around cylinders with large galaxy counts is consistent with a symmetry between galaxy and matter over- and underdensities. In addition, we measure the two-point angular correlation of troughs with galaxies which, in contrast to the lensing signal, is sensitive to galaxy bias on all scales. The lensing signal of troughs and their clustering with galaxies is therefore a promising probe of the statistical properties of matter underdensities and their connection to the galaxy field.« less

  16. CMB lensing tomography with the DES Science Verification galaxies

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Giannantonio, T.

    2016-01-07

    We measure the cross-correlation between the galaxy density in the Dark Energy Survey (DES) Science Verification data and the lensing of the cosmic microwave background (CMB) as reconstructed with the Planck satellite and the South Pole Telescope (SPT). When using the DES main galaxy sample over the full redshift range 0.2 < zphot < 1.2, a cross-correlation signal is detected at 6σ and 4σ with SPT and Planck respectively. We then divide the DES galaxies into five photometric redshift bins, finding significant (>2σ) detections in all bins. Comparing to the fiducial Planck cosmology, we find the redshift evolution of themore » signal matches expectations, although the amplitude is consistently lower than predicted across redshift bins. We test for possible systematics that could affect our result and find no evidence for significant contamination. Finally, we demonstrate how these measurements can be used to constrain the growth of structure across cosmic time. We find the data are fit by a model in which the amplitude of structure in the z < 1.2 universe is 0.73 ± 0.16 times as large as predicted in the LCDM Planck cosmology, a 1.7σ deviation.« less

  17. Beam and Truss Finite Element Verification for DYNA3D

    SciTech Connect (OSTI)

    Rathbun, H J

    2007-07-16

    The explicit finite element (FE) software program DYNA3D has been developed at Lawrence Livermore National Laboratory (LLNL) to simulate the dynamic behavior of structures, systems, and components. This report focuses on verification of beam and truss element formulations in DYNA3D. An efficient protocol has been developed to verify the accuracy of these structural elements by generating a set of representative problems for which closed-form quasi-static steady-state analytical reference solutions exist. To provide as complete coverage as practically achievable, problem sets are developed for each beam and truss element formulation (and their variants) in all modes of loading and physical orientation. Analyses with loading in the elastic and elastic-plastic regimes are performed. For elastic loading, the FE results are within 1% of the reference solutions for all cases. For beam element bending and torsion loading in the plastic regime, the response is heavily dependent on the numerical integration rule chosen, with higher refinement yielding greater accuracy (agreement to within 1%). Axial loading in the plastic regime produces accurate results (agreement to within 0.01%) for all integration rules and element formulations. Truss elements are also verified to provide accurate results (within 0.01%) for elastic and elastic-plastic loading. A sample problem to verify beam element response in ParaDyn, the parallel version DYNA3D, is also presented.

  18. Weak lensing by galaxy troughs in DES Science Verification data

    SciTech Connect (OSTI)

    Gruen, D.; Friedrich, O.; Amara, A.; Bacon, D.; Bonnett, C.; Hartley, W.; Jain, B.; M. Jarvis; Kavprzak, T.; Krause, E.; Mana, A.; Rozo, E.; Rykoff, E. S.; Seitz, S.; Sheldon, E.; Troxel, M. A.; Vikram, V.; Abbott, T. M. C.; Abdalla, F. B.; Allam, S.; Armstrong, R.; Banerji, M.; Bauer, A. H.; Becker, M. R.; Benoit-Levy, A.; Bernstein, G. M.; Bernstein, R. A.; Bertin, E.; Bridle, S. L.; Brooks, D.; Buckley-Geer, E.; Burke, D. L.; Capozzi, D.; Rosell, A. Carnero; Carretero, J.; Crocce, M.; Cunha, C. E.; D'Andrea, C. B.; da Costa, L. N.; DePoy, D. L.; Desai, S.; Diehl, H. T.; Dietrich, J. P.; Doel, P.; Eifler, T. F.; Neto, A. Fausti; Fernandez, E.; Flaugher, B.; Fosalba, P.; Frieman, J.; Gerdes, D. W.; Gruendl, R. A.; Gutierrez, G.; Honscheid, K.; James, D. J.; Kuehn, K.; Kuropatkin, N.; Lahav, O.; Li, T. S.; Lima, M.; Maia, M. A. G.; March, M.; Martini, P.; Melchior, P.; Miller, C. J.; Miguel, R.; Mohr, J. J.; Nord, B.; Orgando, R.; Plazas, A. A.; Reil, K.; Romer, A. K.; Roodman, A.; Sako, M.; Sanchez, E.; Scarpine, V.; Schubnell, M.; Sevilla-Noarbe, I.; Smith, R. C.; Soares-Santos, M.; Sobreira, F.; Suchyta, E.; Swanson, M. E. C.; Tarle, G.; Thaler, J.; Thomas, D.; Walker, A. R.; Wechsler, R. H.; Weller, J.; Zhang, Y.; Zuntz, J.

    2015-11-29

    In this study, we measure the weak lensing shear around galaxy troughs, i.e. the radial alignment of background galaxies relative to underdensities in projections of the foreground galaxy field over a wide range of redshift in Science Verification data from the Dark Energy Survey. Our detection of the shear signal is highly significant (10σ–15σ for the smallest angular scales) for troughs with the redshift range z ϵ [0.2, 0.5] of the projected galaxy field and angular diameters of 10 arcmin…1°. These measurements probe the connection between the galaxy, matter density, and convergence fields. By assuming galaxies are biased tracers of the matter density with Poissonian noise, we find agreement of our measurements with predictions in a fiducial Λ cold dark matter model. The prediction for the lensing signal on large trough scales is virtually independent of the details of the underlying model for the connection of galaxies and matter. Our comparison of the shear around troughs with that around cylinders with large galaxy counts is consistent with a symmetry between galaxy and matter over- and underdensities. In addition, we measure the two-point angular correlation of troughs with galaxies which, in contrast to the lensing signal, is sensitive to galaxy bias on all scales. The lensing signal of troughs and their clustering with galaxies is therefore a promising probe of the statistical properties of matter underdensities and their connection to the galaxy field.

  19. Verification of gyrokinetic microstability codes ?with an LHD configuration

    SciTech Connect (OSTI)

    Mikkelsen, D. R.; Nunami, M.; Watanabe, T. -H.; Sugama, H.; Tanaka, K.

    2014-11-01

    We extend previous benchmarks of the GS2 and GKV-X codes to verify their algorithms for solving the gyrokinetic Vlasov-Poisson equations for plasma microturbulence. Code benchmarks are the most complete way of verifying the correctness of implementations for the solution of mathematical models for complex physical processes such as those studied here. The linear stability calculations reported here are based on the plasma conditions of an ion-ITB plasma in the LHD configuration. The plasma parameters and the magnetic geometry differ from previous benchmarks involving these codes. We find excellent agreement between the independently written pre-processors that calculate the geometrical coefficients used in the gyrokinetic equations. Grid convergence tests are used to establish the resolution and domain size needed to obtain converged linear stability results. The agreement of the frequencies, growth rates and eigenfunctions in the benchmarks reported here provides additional verification that the algorithms used by the GS2 and GKV-X codes are correctly finding the linear eigenvalues and eigenfunctions of the gyrokinetic Vlasov-Poisson equations.

  20. Weak Lensing by Galaxy Troughs in DES Science Verification Data

    SciTech Connect (OSTI)

    Gruen, D.

    2015-09-29

    We measure the weak lensing shear around galaxy troughs, i.e. the radial alignment of background galaxies relative to underdensities in projections of the foreground galaxy field over a wide range of redshift in Science Verification data from the Dark Energy Survey. Our detection of the shear signal is highly significant (10σ–15σ for the smallest angular scales) for troughs with the redshift range z ϵ [0.2, 0.5] of the projected galaxy field and angular diameters of 10 arcmin…1°. These measurements probe the connection between the galaxy, matter density, and convergence fields. By assuming galaxies are biased tracers of the matter density with Poissonian noise, we find agreement of our measurements with predictions in a fiducial Λ cold dark matter model. Furthermore, the prediction for the lensing signal on large trough scales is virtually independent of the details of the underlying model for the connection of galaxies and matter. Our comparison of the shear around troughs with that around cylinders with large galaxy counts is consistent with a symmetry between galaxy and matter over- and underdensities. In addition, we measure the two-point angular correlation of troughs with galaxies which, in contrast to the lensing signal, is sensitive to galaxy bias on all scales. Finally, the lensing signal of troughs and their clustering with galaxies is therefore a promising probe of the statistical properties of matter underdensities and their connection to the galaxy field.

  1. Cosmic shear measurements with Dark Energy Survey Science Verification data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Becker, M. R.

    2016-07-06

    Here, we present measurements of weak gravitational lensing cosmic shear two-point statistics using Dark Energy Survey Science Verification data. We demonstrate that our results are robust to the choice of shear measurement pipeline, either ngmix or im3shape, and robust to the choice of two-point statistic, including both real and Fourier-space statistics. Our results pass a suite of null tests including tests for B-mode contamination and direct tests for any dependence of the two-point functions on a set of 16 observing conditions and galaxy properties, such as seeing, airmass, galaxy color, galaxy magnitude, etc. We use a large suite of simulationsmore » to compute the covariance matrix of the cosmic shear measurements and assign statistical significance to our null tests. We find that our covariance matrix is consistent with the halo model prediction, indicating that it has the appropriate level of halo sample variance. We also compare the same jackknife procedure applied to the data and the simulations in order to search for additional sources of noise not captured by the simulations. We find no statistically significant extra sources of noise in the data. The overall detection significance with tomography for our highest source density catalog is 9.7σ. Cosmological constraints from the measurements in this work are presented in a companion paper (DES et al. 2015).« less

  2. Cosmology from Cosmic Shear with DES Science Verification Data

    SciTech Connect (OSTI)

    Abbott, T.

    2015-07-20

    We present the first constraints on cosmology from the Dark Energy Survey (DES), using weak lensing measurements from the preliminary Science Verification (SV) data. We use 139 square degrees of SV data, which is less than 3% of the full DES survey area. Using cosmic shear 2-point measurements over three redshift bins we find ?8(m=0.3)0.5 = 0:81 0:06 (68% confidence), after marginalising over 7 systematics parameters and 3 other cosmological parameters. Furthermore, we examine the robustness of our results to the choice of data vector and systematics assumed, and find them to be stable. About 20% of our error bar comes from marginalising over shear and photometric redshift calibration uncertainties. The current state-of-the-art cosmic shear measurements from CFHTLenS are mildly discrepant with the cosmological constraints from Planck CMB data. Our results are consistent with both datasets. Our uncertainties are ~30% larger than those from CFHTLenS when we carry out a comparable analysis of the two datasets, which we attribute largely to the lower number density of our shear catalogue. We investigate constraints on dark energy and find that, with this small fraction of the full survey, the DES SV constraints make negligible impact on the Planck constraints. The moderate disagreement between the CFHTLenS and Planck values of ?8(?m=0.3)0.5 is present regardless of the value of w.

  3. Cosmic Shear Measurements with DES Science Verification Data

    SciTech Connect (OSTI)

    Becker, M. R.

    2015-07-20

    We present measurements of weak gravitational lensing cosmic shear two-point statistics using Dark Energy Survey Science Verification data. We demonstrate that our results are robust to the choice of shear measurement pipeline, either ngmix or im3shape, and robust to the choice of two-point statistic, including both real and Fourier-space statistics. Our results pass a suite of null tests including tests for B-mode contamination and direct tests for any dependence of the two-point functions on a set of 16 observing conditions and galaxy properties, such as seeing, airmass, galaxy color, galaxy magnitude, etc. We use a large suite of simulations to compute the covariance matrix of the cosmic shear measurements and assign statistical significance to our null tests. We find that our covariance matrix is consistent with the halo model prediction, indicating that it has the appropriate level of halo sample variance. We also compare the same jackknife procedure applied to the data and the simulations in order to search for additional sources of noise not captured by the simulations. We find no statistically significant extra sources of noise in the data. The overall detection significance with tomography for our highest source density catalog is 9.7σ. Cosmological constraints from the measurements in this work are presented in a companion paper (DES et al. 2015).

  4. Uncertainty Estimation Improves Energy Measurement and Verification Procedures

    SciTech Connect (OSTI)

    Walter, Travis; Price, Phillip N.; Sohn, Michael D.

    2014-05-14

    Implementing energy conservation measures in buildings can reduce energy costs and environmental impacts, but such measures cost money to implement so intelligent investment strategies require the ability to quantify the energy savings by comparing actual energy used to how much energy would have been used in absence of the conservation measures (known as the baseline energy use). Methods exist for predicting baseline energy use, but a limitation of most statistical methods reported in the literature is inadequate quantification of the uncertainty in baseline energy use predictions. However, estimation of uncertainty is essential for weighing the risks of investing in retrofits. Most commercial buildings have, or soon will have, electricity meters capable of providing data at short time intervals. These data provide new opportunities to quantify uncertainty in baseline predictions, and to do so after shorter measurement durations than are traditionally used. In this paper, we show that uncertainty estimation provides greater measurement and verification (M&V) information and helps to overcome some of the difficulties with deciding how much data is needed to develop baseline models and to confirm energy savings. We also show that cross-validation is an effective method for computing uncertainty. In so doing, we extend a simple regression-based method of predicting energy use using short-interval meter data. We demonstrate the methods by predicting energy use in 17 real commercial buildings. We discuss the benefits of uncertainty estimates which can provide actionable decision making information for investing in energy conservation measures.

  5. CRAD, Verification and Validation of Facilities Procedures Assessment Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this assessment is verify and validate the process for the development of operations procedures and that procedures are in place which provide direction to personnel to ensure that the facility is operated within its design bases.

  6. INDEPENDENT VERIFICATION SURVEY REPORT FOR ZONE 1 OF THE EAST TENNESSEE TECHNOLOGY PARK IN OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    King, David A.

    2012-08-16

    Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs).

  7. Enrichment Assay Methods for a UF6 Cylinder Verification Station

    SciTech Connect (OSTI)

    Smith, Leon E.; Jordan, David V.; Misner, Alex C.; Mace, Emily K.; Orton, Christopher R.

    2010-11-30

    International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are typically performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility’s entire cylinder inventory. These enrichment assay methods interrogate only a small fraction of the total cylinder volume, and are time-consuming and expensive to execute for inspectors. Pacific Northwest National Laboratory (PNNL) is developing an unattended measurement system capable of automated enrichment measurements over the full volume of Type 30B and Type 48 cylinders. This Integrated Cylinder Verification System (ICVS) could be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. The focus of this paper is the development of nondestructive assay (NDA) methods that combine “traditional” enrichment signatures (e.g. 185-keV emission from U-235) and more-penetrating “non-traditional” signatures (e.g. high-energy neutron-induced gamma rays spawned primarily from U-234 alpha emission) collected by medium-resolution gamma-ray spectrometers (i.e. sodium iodide or lanthanum bromide). The potential of these NDA methods for the automated assay of feed, tail and product cylinders is explored through MCNP modeling and with field measurements on a cylinder population ranging from 0.2% to 5% in U-235 enrichment.

  8. Field verification of CO{sub 2}-foam. Annual report

    SciTech Connect (OSTI)

    Martin, F.D.; Heller, J.P.; Weiss, W.W.

    1992-11-01

    The East Vacuum Grayburg/San Andres Unit (EVGSAU), operated by Phillips Petroleum Company, is the site selected for a comprehensive evaluation of the use of foam for improving the effectiveness of a CO{sub 2} flood. The four-year project, jointly funded by the EVGSAU Working Interest Owners (WIO), the US Department of Energy (DOE), and the State of New Mexico, began in late 1989. The Petroleum Recovery Research Center (PRCC), a division of the New Mexico Institute of Mining and Technology (NMIMT), is providing laboratory and research support for the project. A Joint Project Advisory Team (JPAT) composed of technical representatives from several major oil companies provides input, review, and guidance for the project. This third annual report details various aspects of the CO{sub 2}-Foam Field Verification Pilot test at EVGSAU. The report presents: (1) an overview of the operating plan for the project, (2) details of the foam injection schedule and design criteria, (3) a discussion of the data collection program and performance criteria to be used in evaluating successful application of foam for mobility control in the EVGSAU CO{sub 2} project, and (4) preliminary results from the field injection test. Specific items discussed in the foam injection design include the determination of surfactant volume and concentration, selection of the surfactant-alternating-gas (SAG) injection sequence for foam generation, field facilities, operations during foam injection, and contingency plans. An extensive data collection program for the project is discussed including production testing, injection well pressure and rate monitoring, injection profiles, production well logging, observation well logging program, and both gas and water phase tracer programs.

  9. Comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program

  10. LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-10-22

    5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

  11. Review of Evaluation, Measurement and Verification Approaches Used to Estimate the Load Impacts and Effectiveness of Energy Efficiency Programs

    SciTech Connect (OSTI)

    none,

    2012-04-01

    Provides an overview of evaluation, measurement, and verification approaches used to estimate the load impacts and effectiveness of energy efficiency programs.

  12. Comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program

  13. Comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program

  14. INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-12-15

    5098-SR-03-0 FINAL REPORT- INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS, BROOKHAVEN NATIONAL LABORATORY

  15. Hazardous Materials Verification and Limited Characterization Report on Sodium and Caustic Residuals in Materials and Fuel Complex Facilities MFC-799/799A

    SciTech Connect (OSTI)

    Gary Mecham

    2010-08-01

    This report is a companion to the Facilities Condition and Hazard Assessment for Materials and Fuel Complex Sodium Processing Facilities MFC-799/799A and Nuclear Calibration Laboratory MFC-770C (referred to as the Facilities Condition and Hazards Assessment). This report specifically responds to the requirement of Section 9.2, Item 6, of the Facilities Condition and Hazards Assessment to provide an updated assessment and verification of the residual hazardous materials remaining in the Sodium Processing Facilities processing system. The hazardous materials of concern are sodium and sodium hydroxide (caustic). The information supplied in this report supports the end-point objectives identified in the Transition Plan for Multiple Facilities at the Materials and Fuels Complex, Advanced Test Reactor, Central Facilities Area, and Power Burst Facility, as well as the deactivation and decommissioning critical decision milestone 1, as specified in U.S. Department of Energy Guide 413.3-8, “Environmental Management Cleanup Projects.” Using a tailored approach and based on information obtained through a combination of process knowledge, emergency management hazardous assessment documentation, and visual inspection, this report provides sufficient detail regarding the quantity of hazardous materials for the purposes of facility transfer; it also provides that further characterization/verification of these materials is unnecessary.

  16. Program Evaluation: Purpose and Principles of Peer Reviews |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Peer reviews have a clear purpose and core principles. Purpose Peer review is essential to ... Core Principles for EERE In-Progress Peer Review Managers and staff in EERE will provide ...

  17. Title 40 CFR 1500 Purpose, Policy, and Mandate | Open Energy...

    Open Energy Info (EERE)

    Purpose, Policy, and Mandate Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 1500 Purpose,...

  18. Federal Utility Partnership Working Group Purpose, Policies, and Operations

    Broader source: Energy.gov [DOE]

    Draft document (last updated in 2010) discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group.

  19. Radionuclide Inventory Distribution Project Data Evaluation and Verification White Paper

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-05-17

    Testing of nuclear explosives caused widespread contamination of surface soils on the Nevada Test Site (NTS). Atmospheric tests produced the majority of this contamination. The Radionuclide Inventory and Distribution Program (RIDP) was developed to determine distribution and total inventory of radionuclides in surface soils at the NTS to evaluate areas that may present long-term health hazards. The RIDP achieved this objective with aerial radiological surveys, soil sample results, and in situ gamma spectroscopy. This white paper presents the justification to support the use of RIDP data as a guide for future evaluation and to support closure of Soils Sub-Project sites under the purview of the Federal Facility Agreement and Consent Order. Use of the RIDP data as part of the Data Quality Objective process is expected to provide considerable cost savings and accelerate site closures. The following steps were completed: - Summarize the RIDP data set and evaluate the quality of the data. - Determine the current uses of the RIDP data and cautions associated with its use. - Provide recommendations for enhancing data use through field verification or other methods. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final end states, and planning remedial actions. In addition, RIDP data may be used to identify specific radionuclide distributions, and augment other non-radionuclide dose rate data. Finally, the RIDP data can be used to estimate internal and external dose rates. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final

  20. Systematic approach to verification and validation: High explosive burn models

    SciTech Connect (OSTI)

    Menikoff, Ralph; Scovel, Christina A.

    2012-04-16

    Most material models used in numerical simulations are based on heuristics and empirically calibrated to experimental data. For a specific model, key questions are determining its domain of applicability and assessing its relative merits compared to other models. Answering these questions should be a part of model verification and validation (V and V). Here, we focus on V and V of high explosive models. Typically, model developers implemented their model in their own hydro code and use different sets of experiments to calibrate model parameters. Rarely can one find in the literature simulation results for different models of the same experiment. Consequently, it is difficult to assess objectively the relative merits of different models. This situation results in part from the fact that experimental data is scattered through the literature (articles in journals and conference proceedings) and that the printed literature does not allow the reader to obtain data from a figure in electronic form needed to make detailed comparisons among experiments and simulations. In addition, it is very time consuming to set up and run simulations to compare different models over sufficiently many experiments to cover the range of phenomena of interest. The first difficulty could be overcome if the research community were to support an online web based database. The second difficulty can be greatly reduced by automating procedures to set up and run simulations of similar types of experiments. Moreover, automated testing would be greatly facilitated if the data files obtained from a database were in a standard format that contained key experimental parameters as meta-data in a header to the data file. To illustrate our approach to V and V, we have developed a high explosive database (HED) at LANL. It now contains a large number of shock initiation experiments. Utilizing the header information in a data file from HED, we have written scripts to generate an input file for a hydro code

  1. Approach to IAEA material-balance verification at the Portsmouth Gas Centrifuge Enrichment Plant

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.; Younkin, J.M.; DeVito, V.J.

    1983-01-01

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP). The strategy makes use of the attributes and variables measurement verification approach, whereby the IAEA would perform independent measurements on a randomly selected subset of the items comprising the U-235 flows and inventories at the plant. In addition, the MUF-D statistic is used as the test statistic for the detection of diversion. The paper includes descriptions of the potential verification activities, as well as calculations of: (1) attributes and variables sample sizes for the various strata, (2) standard deviations of the relevant test statistics, and (3) the detection sensitivity which the IAEA might achieve by this verification strategy at GCEP.

  2. Guidelines for Sandia ASCI Verification and Validation Plans - Content and Format: Version 1.0

    SciTech Connect (OSTI)

    TRUCANO,TIMOTHY G.; MOYA,JAIME L.

    1999-12-01

    This report summarizes general guidelines for the development of Verification and Validation (V and V) plans for ASCI code projects at Sandia National Laboratories. The main content categories recommended by these guidelines for explicit treatment in Sandia V and V plans are (1) stockpile drivers influencing the code development project (2) the key phenomena to be modeled by the individual code; (3) software verification strategy and test plan; and (4) code validation strategy and test plans. The authors of this document anticipate that the needed content of the V and V plans for the Sandia ASCI codes will evolve as time passes. These needs will be reflected by future versions of this document.

  3. Investigation of the spatial resolution of an online dose verification device

    SciTech Connect (OSTI)

    Asuni, G.; Rickey, D. W.; McCurdy, B. M. C.

    2012-02-15

    Purpose: The aim of this work is to characterize a new online dose verification device, COMPASS transmission detector array (IBA Dosimetry, Schwarzenbruck, Germany). The array is composed of 1600 cylindrical ionization chambers of 3.8 mm diameter, separated by 6.5 mm center-to-center spacing, in a 40 x 40 arrangement. Methods: The line spread function (LSF) of a single ion chamber in the detector was measured with a narrow slit collimator for a 6 MV photon beam. The 0.25 x 10 mm{sup 2} slit was formed by two machined lead blocks. The LSF was obtained by laterally translating the detector in 0.25 mm steps underneath the slit over a range of 24 mm and taking a measurement at each step. This measurement was validated with Monte Carlo simulation using BEAMnrc and DOSXYZnrc. The presampling modulation transfer function (MTF), the Fourier transform of the line spread function, was determined and compared to calculated (Monte Carlo and analytical) MTFs. Two head-and-neck intensity modulated radiation therapy (IMRT) fields were measured using the device and were used to validate the LSF measurement. These fields were simulated with the BEAMnrc Monte Carlo model, and the Monte Carlo generated incident fluence was convolved with the 2D detector response function (derived from the measured LSF) to obtain calculated dose. The measured and calculated dose distributions were then quantitatively compared using {chi}-comparison criteria of 3% dose difference and 3 mm distance-to-agreement for in-field points (defined as those above the 10% maximum dose threshold). Results: The full width at half-maximum (FWHM) of the measured detector response for a single chamber is 4.3 mm, which is comparable to the chamber diameter of 3.8 mm. The pre-sampling MTF was calculated, and the resolution of one chamber was estimated as 0.25 lp/mm from the first zero crossing. For both examined IMRT fields, the {chi}-comparison between measured and calculated data show good agreement with 95.1% and 96

  4. Feasibility of RACT for 3D dose measurement and range verification in a water phantom

    SciTech Connect (OSTI)

    Alsanea, Fahed; Moskvin, Vadim; Stantz, Keith M.

    2015-02-15

    Purpose: The objective of this study is to establish the feasibility of using radiation-induced acoustics to measure the range and Bragg peak dose from a pulsed proton beam. Simulation studies implementing a prototype scanner design based on computed tomographic methods were performed to investigate the sensitivity to proton range and integral dose. Methods: Derived from thermodynamic wave equation, the pressure signals generated from the dose deposited from a pulsed proton beam with a 1 cm lateral beam width and a range of 16, 20, and 27 cm in water using Monte Carlo methods were simulated. The resulting dosimetric images were reconstructed implementing a 3D filtered backprojection algorithm and the pressure signals acquired from a 71-transducer array with a cylindrical geometry (30 40 cm) rotated over 2? about its central axis. Dependencies on the detector bandwidth and proton beam pulse width were performed, after which, different noise levels were added to the detector signals (using 1 ?s pulse width and a 0.5 MHz cutoff frequency/hydrophone) to investigate the statistical and systematic errors in the proton range (at 20 cm) and Bragg peak dose (of 1 cGy). Results: The reconstructed radioacoustic computed tomographic image intensity was shown to be linearly correlated to the dose within the Bragg peak. And, based on noise dependent studies, a detector sensitivity of 38 mPa was necessary to determine the proton range to within 1.0 mm (full-width at half-maximum) (systematic error < 150 ?m) for a 1 cGy Bragg peak dose, where the integral dose within the Bragg peak was measured to within 2%. For existing hydrophone detector sensitivities, a Bragg peak dose of 1.6 cGy is possible. Conclusions: This study demonstrates that computed tomographic scanner based on ionizing radiation-induced acoustics can be used to verify dose distribution and proton range with centi-Gray sensitivity. Realizing this technology into the clinic has the potential to significantly impact

  5. Camera selection for real-time in vivo radiation treatment verification systems using Cherenkov imaging

    SciTech Connect (OSTI)

    Andreozzi, Jacqueline M. Glaser, Adam K.; Zhang, Rongxiao; Jarvis, Lesley A.; Gladstone, David J.; Pogue, Brian W.

    2015-02-15

    Purpose: To identify achievable camera performance and hardware needs in a clinical Cherenkov imaging system for real-time, in vivo monitoring of the surface beam profile on patients, as novel visual information, documentation, and possible treatment verification for clinicians. Methods: Complementary metal-oxide-semiconductor (CMOS), charge-coupled device (CCD), intensified charge-coupled device (ICCD), and electron multiplying-intensified charge coupled device (EM-ICCD) cameras were investigated to determine Cherenkov imaging performance in a clinical radiotherapy setting, with one emphasis on the maximum supportable frame rate. Where possible, the image intensifier was synchronized using a pulse signal from the Linac in order to image with room lighting conditions comparable to patient treatment scenarios. A solid water phantom irradiated with a 6 MV photon beam was imaged by the cameras to evaluate the maximum frame rate for adequate Cherenkov detection. Adequate detection was defined as an average electron count in the background-subtracted Cherenkov image region of interest in excess of 0.5% (327 counts) of the 16-bit maximum electron count value. Additionally, an ICCD and an EM-ICCD were each used clinically to image two patients undergoing whole-breast radiotherapy to compare clinical advantages and limitations of each system. Results: Intensifier-coupled cameras were required for imaging Cherenkov emission on the phantom surface with ambient room lighting; standalone CMOS and CCD cameras were not viable. The EM-ICCD was able to collect images from a single Linac pulse delivering less than 0.05 cGy of dose at 30 frames/s (fps) and pixel resolution of 512 × 512, compared to an ICCD which was limited to 4.7 fps at 1024 × 1024 resolution. An intensifier with higher quantum efficiency at the entrance photocathode in the red wavelengths [30% quantum efficiency (QE) vs previous 19%] promises at least 8.6 fps at a resolution of 1024 × 1024 and lower monetary

  6. Verification of the CENTRM Module for Adaptation of the SCALE Code to NGNP Prismatic and PBR Core Designs

    SciTech Connect (OSTI)

    Ganapol, Barry; Maldonado, Ivan

    2014-01-23

    The generation of multigroup cross sections lies at the heart of the very high temperature reactor (VHTR) core design, whether the prismatic (block) or pebble-bed type. The design process, generally performed in three steps, is quite involved and its execution is crucial to proper reactor physics analyses. The primary purpose of this project is to develop the CENTRM cross-section processing module of the SCALE code package for application to prismatic or pebble-bed core designs. The team will include a detailed outline of the entire processing procedure for application of CENTRM in a final report complete with demonstration. In addition, they will conduct a thorough verification of the CENTRM code, which has yet to be performed. The tasks for this project are to: Thoroughly test the panel algorithm for neutron slowing down; Develop the panel algorithm for multi-materials; Establish a multigroup convergence 1D transport acceleration algorithm in the panel formalism; Verify CENTRM in 1D plane geometry; Create and test the corresponding transport/panel algorithm in spherical and cylindrical geometries; and, Apply the verified CENTRM code to current VHTR core design configurations for an infinite lattice, including assessing effectiveness of Dancoff corrections to simulate TRISO particle heterogeneity.

  7. Program Evaluation: Purpose and Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purpose and Costs Program Evaluation: Purpose and Costs Steps one through three will help you establish the purpose of and determine which resources are available for your evaluation (learn more about the other steps in general program evaluations): Step 1: Decide the Evaluation Objectives Step 2: Determine Resources Available Step 3: Determine the Timeline for Completing the Evaluation Step 1: Decide the Evaluation Objectives Evaluation objectives are determined by careful consideration of the

  8. Program Evaluation: Define Review Purpose and Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Define Review Purpose and Scope Program Evaluation: Define Review Purpose and Scope The first step in preparation for a particular peer review is to determine the specific purpose and scope of the review within the context of other review and management activities. Improving program management and demonstrating public accountability, providing an honest independent technical review of the projects and program, and communicating the value of the programs to the larger public are all potentially

  9. Verification of a VRF Heat Pump Computer Model in EnergyPlus

    SciTech Connect (OSTI)

    Nigusse, Bereket; Raustad, Richard

    2013-06-01

    This paper provides verification results of the EnergyPlus variable refrigerant flow (VRF) heat pump computer model using manufacturer's performance data. The paper provides an overview of the VRF model, presents the verification methodology, and discusses the results. The verification provides quantitative comparison of full and part-load performance to manufacturer's data in cooling-only and heating-only modes of operation. The VRF heat pump computer model uses dual range bi-quadratic performance curves to represent capacity and Energy Input Ratio (EIR) as a function of indoor and outdoor air temperatures, and dual range quadratic performance curves as a function of part-load-ratio for modeling part-load performance. These performance curves are generated directly from manufacturer's published performance data. The verification compared the simulation output directly to manufacturer's performance data, and found that the dual range equation fit VRF heat pump computer model predicts the manufacturer's performance data very well over a wide range of indoor and outdoor temperatures and part-load conditions. The predicted capacity and electric power deviations are comparbale to equation-fit HVAC computer models commonly used for packaged and split unitary HVAC equipment.

  10. North Korea's nuclear weapons program:verification priorities and new challenges.

    SciTech Connect (OSTI)

    Moon, Duk-ho

    2003-12-01

    A comprehensive settlement of the North Korean nuclear issue may involve military, economic, political, and diplomatic components, many of which will require verification to ensure reciprocal implementation. This paper sets out potential verification methodologies that might address a wide range of objectives. The inspection requirements set by the International Atomic Energy Agency form the foundation, first as defined at the time of the Agreed Framework in 1994, and now as modified by the events since revelation of the North Korean uranium enrichment program in October 2002. In addition, refreezing the reprocessing facility and 5 MWe reactor, taking possession of possible weapons components and destroying weaponization capabilities add many new verification tasks. The paper also considers several measures for the short-term freezing of the North's nuclear weapon program during the process of negotiations, should that process be protracted. New inspection technologies and monitoring tools are applicable to North Korean facilities and may offer improved approaches over those envisioned just a few years ago. These are noted, and potential bilateral and regional verification regimes are examined.

  11. Verification of Advective Bar Elements Implemented in the Aria Thermal Response Code.

    SciTech Connect (OSTI)

    Mills, Brantley

    2016-01-01

    A verification effort was undertaken to evaluate the implementation of the new advective bar capability in the Aria thermal response code. Several approaches to the verification process were taken : a mesh refinement study to demonstrate solution convergence in the fluid and the solid, visually examining the mapping of the advective bar element nodes to the surrounding surfaces, and a comparison of solutions produced using the advective bars for simple geometries with solutions from commercial CFD software . The mesh refinement study has shown solution convergence for simple pipe flow in both temperature and velocity . Guidelines were provided to achieve appropriate meshes between the advective bar elements and the surrounding volume. Simulations of pipe flow using advective bars elements in Aria have been compared to simulations using the commercial CFD software ANSYS Fluent (r) and provided comparable solutions in temperature and velocity supporting proper implementation of the new capability. Verification of Advective Bar Elements iv Acknowledgements A special thanks goes to Dean Dobranich for his guidance and expertise through all stages of this effort . His advice and feedback was instrumental to its completion. Thanks also goes to Sam Subia and Tolu Okusanya for helping to plan many of the verification activities performed in this document. Thank you to Sam, Justin Lamb and Victor Brunini for their assistance in resolving issues encountered with running the advective bar element model. Finally, thanks goes to Dean, Sam, and Adam Hetzler for reviewing the document and providing very valuable comments.

  12. Guidelines for the verification and validation of expert system software and conventional software: Bibliography. Volume 8

    SciTech Connect (OSTI)

    Miller, L.A.; Hayes, J.E.; Mirsky, S.M.

    1995-03-01

    This volume contains all of the technical references found in Volumes 1-7 concerning the development of guidelines for the verification and validation of expert systems, knowledge-based systems, other AI systems, object-oriented systems, and conventional systems.

  13. Using Measurement and Verification to Manage Risk in Federal Energy- and Water-Saving Projects

    Broader source: Energy.gov [DOE]

    "Risk," in the context of measurement and verification (M&V), refers to the uncertainty that expected savings will be realized. Assumption of risk implies acceptance of the potential monetary consequences. Energy service companies (ESCOs) and agencies are each reluctant to assume responsibility for factors they cannot control, and holding certain parameters fixed in the M&V plan can match up responsibilities.

  14. Regulation Identifier Number Title/Subject/Purpose Rule Type

    Broader source: Energy.gov (indexed) [DOE]

    Regulation Identifier Number TitleSubjectPurpose Rule Type Status 1990-AA40 ... Amend DOE's statutory prescribed regulation, which set forth the procedural rules ...

  15. The Purpose and Value of Successful Technology Demonstrations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purpose and Value of Successful Technology Demonstrations - The Energy Independence and Security Act of 2007 Demonstrations by Steve Bossart, NETL Senior Management and Technical...

  16. Remote Control of Laboratory Equipment for Educational Purposes...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remote Control of Laboratory Equipment for Educational Purposes This invention consists of a method to remote control many types of laboratory equipment that is typically found in ...

  17. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  18. Passive Tomography for Spent Fuel Verification: Analysis Framework and Instrument Design Study

    SciTech Connect (OSTI)

    White, Timothy A.; Svard, Staffan J.; Smith, Leon E.; Mozin, Vladimir V.; Jansson, Peter; Davour, Anna; Grape, Sophie; Trellue, H.; Deshmukh, Nikhil S.; Wittman, Richard S.; Honkamaa, Tapani; Vaccaro, Stefano; Ely, James

    2015-05-18

    The potential for gamma emission tomography (GET) to detect partial defects within a spent nuclear fuel assembly is being assessed through a collaboration of Support Programs to the International Atomic Energy Agency (IAEA). In the first phase of this study, two safeguards verification objectives have been identified. The first is the independent determination of the number of active pins that are present in the assembly, in the absence of a priori information. The second objective is to provide quantitative measures of pin-by-pin properties, e.g. activity of key isotopes or pin attributes such as cooling time and relative burnup, for the detection of anomalies and/or verification of operator-declared data. The efficacy of GET to meet these two verification objectives will be evaluated across a range of fuel types, burnups, and cooling times, and with a target interrogation time of less than 60 minutes. The evaluation of GET viability for safeguards applications is founded on a modelling and analysis framework applied to existing and emerging GET instrument designs. Monte Carlo models of different fuel types are used to produce simulated tomographer responses to large populations of “virtual” fuel assemblies. Instrument response data are processed by a variety of tomographic-reconstruction and image-processing methods, and scoring metrics specific to each of the verification objectives are defined and used to evaluate the performance of the methods. This paper will provide a description of the analysis framework and evaluation metrics, example performance-prediction results, and describe the design of a “universal” GET instrument intended to support the full range of verification scenarios envisioned by the IAEA.

  19. General-Purpose Heat Source development: Extended series test program large fragment tests

    SciTech Connect (OSTI)

    Cull, T.A.

    1989-08-01

    General-Purpose Heat Source radioisotope thermoelectric generators (GPHS-RTGs) will provide electric power for the NASA Galileo and European Space Agency Ulysses missions. Each GPHS-RTG comprises two major components: GPHS modules, which provide thermal energy, and a thermoelectric converter, which converts the thermal energy into electric power. Each of the 18 GPHS modules in a GPHS-RTG contains four /sup 238/PuO/sub 2/-fueled capsules. LANL conducted a series of safety verification tests on the GPHS-RTG before the scheduled May 1986 launch of the Galileo spacecraft to assess the ability of the GPHS modules to contain the plutonia in potential accident environments. As a result of the Challenger 51-L accident in January 1986, NASA postponed the launch of Galileo; the launch vehicle was reconfigured and the spacecraft trajectory was modified. These actions prompted NASA to reevaluate potential mission accidents, and an extended series safety test program was initiated. The program included a series of large fragment tests that simulated the collision of solid rocket booster (SRB) fragments, generated in an SRB motor case rupture or resulting from a range safety officer SRB destruct action, with the GPHS-RTG. The tests indicated that fueled clads, inside a converter, will not breach or release fuel after a square (142 cm on a side) SRB fragment impacts flat-on at velocities up to 212 m/s, and that only the leading fueled capsules breach and release fuel after the square SRB fragment impacts the modules, inside the converter, edge-on at 95 m/s. 8 refs., 32 figs., 7 tabs.

  20. Montana Tribes Realize Long-Held Vision of Acquiring Kerr Dam: Interview with Energy Keepers Inc. CEO Brian Lipscomb

    Office of Energy Efficiency and Renewable Energy (EERE)

    A short interview with Brian Lipscomb, president and CEO of Energy Keepers, Inc., a tribal corporation established in the fall of 2012 to manage the Confederated Salish and Kootenai Tribes’ (CSKT’s) planned acquisition of Kerr Dam.

  1. Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois

    SciTech Connect (OSTI)

    W. C. Adams

    2007-05-25

    Oak Ridge Institute for Science and Education (ORISE) conducted independent verification radiological survey activities at Argonne National Laboratory’s Building 315, Zero Power Reactor-6 facility in Argonne, Illinois. Independent verification survey activities included document and data reviews, alpha plus beta and gamma surface scans, alpha and beta surface activity measurements, and instrumentation comparisons. An interim letter report and a draft report, documenting the verification survey findings, were submitted to the DOE on November 8, 2006 and February 22, 2007, respectively (ORISE 2006b and 2007).

  2. The Challenge for Arms Control Verification in the Post-New START World

    SciTech Connect (OSTI)

    Wuest, C R

    2012-05-24

    Nuclear weapon arms control treaty verification is a key aspect of any agreement between signatories to establish that the terms and conditions spelled out in the treaty are being met. Historically, arms control negotiations have focused more on the rules and protocols for reducing the numbers of warheads and delivery systems - sometimes resorting to complex and arcane procedures for counting forces - in an attempt to address perceived or real imbalances in a nation's strategic posture that could lead to instability. Verification procedures are generally defined in arms control treaties and supporting documents and tend to focus on technical means and measures designed to ensure that a country is following the terms of the treaty and that it is not liable to engage in deception or outright cheating in an attempt to circumvent the spirit and the letter of the agreement. As the Obama Administration implements the articles, terms, and conditions of the recently ratified and entered-into-force New START treaty, there are already efforts within and outside of government to move well below the specified New START levels of 1550 warheads, 700 deployed strategic delivery vehicles, and 800 deployed and nondeployed strategic launchers (Inter-Continental Ballistic Missile (ICBM) silos, Submarine-Launched Ballistic Missile (SLBM) tubes on submarines, and bombers). A number of articles and opinion pieces have appeared that advocate for significantly deeper cuts in the U.S. nuclear stockpile, with some suggesting that unilateral reductions on the part of the U.S. would help coax Russia and others to follow our lead. Papers and studies prepared for the U.S. Department of Defense and at the U.S. Air War College have also been published, suggesting that nuclear forces totaling no more than about 300 warheads would be sufficient to meet U.S. national security and deterrence needs. (Davis 2011, Schaub and Forsyth 2010) Recent articles by James M. Acton and others suggest that the

  3. Self-Direction of Public Purpose Charges (LECPPP)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Oregon's 1999 electric-utility restructuring legislation (SB 1149) required Pacific Power and Portland General Electric (PGE) to collect a 3% public-purpose charge from their customers to support...

  4. Verification and validation of the decision analysis model for assessment of tank waste remediation system waste treatment strategies

    SciTech Connect (OSTI)

    Awadalla, N.G.; Eaton, S.C.F.

    1996-09-04

    This document is the verification and validation final report for the Decision Analysis Model for Assessment of Tank Waste Remediation System Waste Treatment Strategies. This model is also known as the INSIGHT Model.

  5. Identifying, Visualizing, and Fusing Social Media Data to Support Nonproliferation and Arms Control Treaty Verification: Preliminary Results

    SciTech Connect (OSTI)

    Gastelum, Zoe N.; Cramer, Nicholas O.; Benz, Jacob M.; Kreyling, Sean J.; Henry, Michael J.; Corley, Courtney D.; Whattam, Kevin M.

    2013-07-11

    While international nonproliferation and arms control verification capabilities have their foundations in physical and chemical sensors, state declarations, and on-site inspections, verification experts are beginning to consider the importance of open source data to complement and support traditional means of verification. One of those new, and increasingly expanding, sources of open source information is social media, which can be ingested and understood through social media analytics (SMA). Pacific Northwest National Laboratory (PNNL) is conducting research to further our ability to identify, visualize, and fuse social media data to support nonproliferation and arms control treaty verification efforts. This paper will describe our preliminary research to examine social media signatures of nonproliferation or arms control proxy events. We will describe the development of our preliminary nonproliferation and arms control proxy events, outline our initial findings, and propose ideas for future work.

  6. TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 2 DF WASTE LINE REMOVAL, BNL

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-07-09

    5098-SR-02-0 PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 2 DF WASTE LINE REMOVAL, BROOKHAVEN NATIONAL LABORATORY

  7. Attachment 1: DOE Phased Retirement Implementation Plan Purpose:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: DOE Phased Retirement Implementation Plan Purpose: Phased retirement is designed to assist agencies with knowledge management and continuity of operations in the short term. Although the main purpose is to enhance the mentoring and training of the employees who will be filling the positions or taking on duties of more experienced retiring employees, phased retirement may also be used to provide employees with the opportunity to share experiences across Departmental elements. Phased retirement

  8. Results of the Independent Radiological Verification Survey of Remediation at Building 31, Former Linde Uranium Refinery, Tonawanda, New York (LI001V)

    SciTech Connect (OSTI)

    McKenzie, S.P.; Uziel, M.S.

    1998-11-01

    As part of the Formerly Utilized Sites Remedial Action Progmq a team from Oak Ridge National Laboratory (ORNL) conducted a radiological veriihtion survey of Building 31 at the former Linde Uranium Refinery, Tonawau& New York. The purpose of the survey was to ver@ that remedial action completed by the project management contractor had reduced contamination levels to within authorized limits. Prior to remediatioq tied radioactive material was prevalent throughout the building and in some of the ductwork Decontaminadon consisted of removing surfhce contamination from floors, baseboards, and overhead areas; removing some air ducts; and vacuuming dust. Building 31 at the former Linde site in TonawandA New Yorlq was thoroughly investigated inside and outside for radionuclide residues. The verification team discovered previously undetected contaminadon beneath the concrete pad on the first floor and underneath floor tiles on the second floor. All suspect floor tiles were removed and any contamination beneath them cleaned to below guideline levels. The verification team also discovered elevated radiation levels associated with overhead air lines that led to the eventual removal of the entire air lige and a complete investigation of the history of all process piping in the building. Final verification surveys showed that residual surface beta-gamma activity levels were slightly elevated in some places but below U.S. Department of Energy applicable guidelines for protection against radiation (Table 1). Similarly, removable radioactive contamination was also below applicable guidelines. Exposure rates within the building were at typical background levels, and no consistently elevated indoor radon concentrations were measured. However, radionuclide analysis of subsurface soil from beneath the concrete floor on the ground level showed concentrations of `*U and'% that exceeded applicable guidelines. At the time of this survey, there was no measured exposure pathway for this

  9. SU-E-T-364: 6X FFF and 10X FFF Portal Dosimetry Output Factor Verification: Application for SRS/SBRT

    SciTech Connect (OSTI)

    Gulam, M; Bellon, M; Gopal, A; Wen, N; Chetty, I; Gordon, J; Hames, S; Schmidt, M

    2014-06-01

    Purpose: To enhance portal dosimetry of high dose rate SRS/SBRT plan verifications with extensive imager measurement of output factors (OF). Methods: Electronic portal image dosimetry (EPID), implemented on the Varian Edge allows for acquisition of its two energies: 6X FFF and 10 FFF (1400 and 2400 MU/min, respectively) at source to imager distance (SID) =100cm without imager saturation. Square and rectangular aSi OF following EPID calibration were obtained. Data taken was similar to that obtained during beam commissioning (of almost all field sizes from 11 to 1515 and 2020 cm{sup 2}, [Trilogy] and [Edge], respectively) to construct a table using the OF tool for use in the Portal Dosimetry Prediction Algorithm (PDIP v11). The Trilogy 6x SRS 1000 MU/min EPID data were taken at 140 SID. The large number of OF were obtained for comparison to that obtained with diode detectors and ion chambers (cc13 for >33 field size). As Edge PDIP verification is currently ongoing, EPID measurements of three SRS/SBRT plans for the Trilogy were taken and compared to results obtained prior to these measurements. Results: The relative difference output factors of field sizes 22 and higher compared to commissioning data were (mean+/-SD, [range]): Edge 6X (?1.9+/?2.9%, [?5.9%,3.1%]), Edge 10X (?0.7+/?1.2%, [? 3.3%,0.8%] and Trilogy (0.03+/?0.5%, [?1.4%,1.1%]) with EPID over predicting. The results for the 140 SID showed excellent agreement throughout except at the 11 to 115 and 151 field sizes where differences were: ?10.6%, ?6.0% and ?5.8%. The differences were also most pronounced for the 11 at 100 SID. They were ?7.4% and ?11.5% for 6X and 10X, respectively. The Gamma (3%, 1mm) for three clinical plans improved by 8.7+/?1.8%. Conclusion: Results indicate that imager output factor measurements at any SID of high dose rate SRS/SBRT are quite reliable for portal dosimetry plan verification except for the smallest fields. This work was not funded by Varian Oncology Systems. Some

  10. INDEPENDENT VERIFICATION OF THE CENTRAL CAMPUS AND SOUTHEAST LABORATORY COMPLEX BUILDING SLABS AT OAK RIDGE NATIONAL LABORATORY, OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-07-24

    Oak Ridge Associated Universities/Oak Ridge Institute for Science and Education (ORAU/ORISE) has completed the independent verification survey of the Central Campus and Southeast Lab Complex Building Slabs. The results of this effort are provided. The objective of this verification survey was to provide independent review and field assessment of remediation actions conducted by SEC, and to independently assess whether the final radiological condition of the slabs met the release guidelines.

  11. Measurement and Verification of Energy Savings and Performance from Advanced Lighting Controls

    Broader source: Energy.gov [DOE]

    This document provides a framework for measurement and verification (M&V) of energy savings, performance, and user satisfaction from lighting retrofit projects involving occupancy-sensor-based, daylighting, and/or other types of automatic lighting. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for retrofit projects and to assist in developing specific project M&V plans.

  12. Certainty in Stockpile Computing: Recommending a Verification and Validation Program for Scientific Software

    SciTech Connect (OSTI)

    Lee, J.R.

    1998-11-01

    As computing assumes a more central role in managing the nuclear stockpile, the consequences of an erroneous computer simulation could be severe. Computational failures are common in other endeavors and have caused project failures, significant economic loss, and loss of life. This report examines the causes of software failure and proposes steps to mitigate them. A formal verification and validation program for scientific software is recommended and described.

  13. Energy Department Requests Information on Biofuels & Bioproducts Process Pilot Verification Capabilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy is seeking input from industry, academia, national laboratories, and other biofuels and bioproducts stakeholders to identify existing pilot- or process development-scale facilities with the capability to perform process verifications for biomass conversion pathways to biofuels, bioproducts, or intermediates that integrate multiple unit operations on a scale of approximately 0.5 or greater tons of dry biomass input per day.

  14. Verification of Sulfate Attack Penetration Rates for Saltstone Disposal Unit Modeling

    SciTech Connect (OSTI)

    Flach, G. P.

    2015-05-12

    Recent Special Analysis modeling of Saltstone Disposal Units consider sulfate attack on concrete and utilize degradation rates estimated from Cementitious Barriers Partnership software simulations. This study provides an independent verification of those simulation results using an alternative analysis method and an independent characterization data source. The sulfate penetration depths estimated herein are similar to the best-estimate values in SRNL-STI-2013-00118 Rev. 2 and well below the nominal values subsequently used to define Saltstone Special Analysis base cases.

  15. Cleanup Verification Package for the 118-F-3, Minor Construction Burial Ground

    SciTech Connect (OSTI)

    M. J. Appel

    2007-01-04

    This cleanup verification package documents completion of remedial action for the 118-F-3, Minor Construction Burial Ground waste site. This site was an open field covered with cobbles, with no vegetation growing on the surface. The site received irradiated reactor parts that were removed during conversion of the 105-F Reactor from the Liquid 3X to the Ball 3X Project safety systems and received mostly vertical safety rod thimbles and step plugs.

  16. Guide to Government Witnessing and Review of Measurement and Verification Activities

    Broader source: Energy.gov [DOE]

    Document provides guidance pertaining to government witnessing of measurement and verification (M&V) activities in Federal energy savings performance contract (ESPC) projects. Witnessing of M&V activities is a part of the process of reviewing and approving M&V deliverables and the on-site inspections, spot measurements, short-term monitoring, and performance tests described in the M&V plan.

  17. Final Report for "Verification and Validation of Radiation Hydrodynamics for Astrophysical Applications"

    SciTech Connect (OSTI)

    Zingale, M; Howell, L H

    2010-03-17

    The motivation for this work is to gain experience in the methodology of verification and validation (V&V) of astrophysical radiation hydrodynamics codes. In the first period of this work, we focused on building the infrastructure to test a single astrophysical application code, Castro, developed in collaboration between Lawrence Livermore National Laboratory (LLNL) and Lawrence Berkeley Laboratory (LBL). We delivered several hydrodynamic test problems, in the form of coded initial conditions and documentation for verification, routines to perform data analysis, and a generalized regression test suite to allow for continued automated testing. Astrophysical simulation codes aim to model phenomena that elude direct experimentation. Our only direct information about these systems comes from what we observe, and may be transient. Simulation can help further our understanding by allowing virtual experimentation of these systems. However, to have confidence in our simulations requires us to have confidence in the tools we use. Verification and Validation is a process by which we work to build confidence that a simulation code is accurately representing reality. V&V is a multistep process, and is never really complete. Once a single test problem is working as desired (i.e. that problem is verified), one wants to ensure that subsequent code changes do not break that test. At the same time, one must also search for new verification problems that test the code in a new way. It can be rather tedious to manually retest each of the problems, so before going too far with V&V, it is desirable to have an automated test suite. Our project aims to provide these basic tools for astrophysical radiation hydrodynamics codes.

  18. Thermal Hydraulic Modeling: Cross-Verification, Validation and Co-design |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne Leadership Computing Facility computed on Intrepid with Nek5000 Velocity magnitude distribution in a flow through the 25-pin swirl-vane spacer grid of Matis benchmark. Computed on Intrepid with Nek5000 and visualized on Eureka with VisIt at the ALCF. Aleks Obabko, Paul Fischer, and Tim Tautges, Argonne National Laboratory Thermal Hydraulic Modeling: Cross-Verification, Validation and Co-design PI Name: Paul F. Fischer PI Email: fischer@mcs.anl.gov Institution: Argonne National

  19. H–J–B Equations of Optimal Consumption-Investment and Verification Theorems

    SciTech Connect (OSTI)

    Nagai, Hideo

    2015-04-15

    We consider a consumption-investment problem on infinite time horizon maximizing discounted expected HARA utility for a general incomplete market model. Based on dynamic programming approach we derive the relevant H–J–B equation and study the existence and uniqueness of the solution to the nonlinear partial differential equation. By using the smooth solution we construct the optimal consumption rate and portfolio strategy and then prove the verification theorems under certain general settings.

  20. SU-E-T-350: Verification of Gating Performance of a New Elekta Gating Solution: Response Kit and Catalyst System

    SciTech Connect (OSTI)

    Xie, X; Cao, D; Housley, D; Mehta, V; Shepard, D

    2014-06-01

    Purpose: In this work, we have tested the performance of new respiratory gating solutions for Elekta linacs. These solutions include the Response gating and the C-RAD Catalyst surface mapping system.Verification measurements have been performed for a series of clinical cases. We also examined the beam on latency of the system and its impact on delivery efficiency. Methods: To verify the benefits of tighter gating windows, a Quasar Respiratory Motion Platform was used. Its vertical-motion plate acted as a respiration surrogate and was tracked by the Catalyst system to generate gating signals. A MatriXX ion-chamber array was mounted on its longitudinal-moving platform. Clinical plans are delivered to a stationary and moving Matrix array at 100%, 50% and 30% gating windows and gamma scores were calculated comparing moving delivery results to the stationary result. It is important to note that as one moves to tighter gating windows, the delivery efficiency will be impacted by the linac's beam-on latency. Using a specialized software package, we generated beam-on signals of lengths of 1000ms, 600ms, 450ms, 400ms, 350ms and 300ms. As the gating windows get tighter, one can expect to reach a point where the dose rate will fall to nearly zero, indicating that the gating window is close to beam-on latency. A clinically useful gating window needs to be significantly longer than the latency for the linac. Results: As expected, the use of tighter gating windows improved delivery accuracy. However, a lower limit of the gating window, largely defined by linac beam-on latency, exists at around 300ms. Conclusion: The Response gating kit, combined with the C-RAD Catalyst, provides an effective solution for respiratorygated treatment delivery. Careful patient selection, gating window design, even visual/audio coaching may be necessary to ensure both delivery quality and efficiency. This research project is funded by Elekta.

  1. Steps towards verification and validation of the Fetch code for Level 2 analysis, design, and optimization of aqueous homogeneous reactors

    SciTech Connect (OSTI)

    Nygaard, E. T.; Pain, C. C.; Eaton, M. D.; Gomes, J. L. M. A.; Goddard, A. J. H.; Gorman, G.; Tollit, B.; Buchan, A. G.; Cooling, C. M.; Angelo, P. L.

    2012-07-01

    Babcock and Wilcox Technical Services Group (B and W) has identified aqueous homogeneous reactors (AHRs) as a technology well suited to produce the medical isotope molybdenum 99 (Mo-99). AHRs have never been specifically designed or built for this specialized purpose. However, AHRs have a proven history of being safe research reactors. In fact, in 1958, AHRs had 'a longer history of operation than any other type of research reactor using enriched fuel' and had 'experimentally demonstrated to be among the safest of all various type of research reactor now in use [1].' While AHRs have been modeled effectively using simplified 'Level 1' tools, the complex interactions between fluids, neutronics, and solid structures are important (but not necessarily safety significant). These interactions require a 'Level 2' modeling tool. Imperial College London (ICL) has developed such a tool: Finite Element Transient Criticality (FETCH). FETCH couples the radiation transport code EVENT with the computational fluid dynamics code (Fluidity), the result is a code capable of modeling sub-critical, critical, and super-critical solutions in both two-and three-dimensions. Using FETCH, ICL researchers and B and W engineers have studied many fissioning solution systems include the Tokaimura criticality accident, the Y12 accident, SILENE, TRACY, and SUPO. These modeling efforts will ultimately be incorporated into FETCH'S extensive automated verification and validation (V and V) test suite expanding FETCH'S area of applicability to include all relevant physics associated with AHRs. These efforts parallel B and W's engineering effort to design and optimize an AHR to produce Mo99. (authors)

  2. SU-E-J-201: Position Verification in Breast Cancer Radiotherapy Using Tantalum Clips in the Lumpectomy Cavity

    SciTech Connect (OSTI)

    Santvoort, J van; Van der Drift, M; Kuipers, J; Mast, M; Van Egmond, J; Struikmans, H

    2014-06-01

    Purpose: To find out whether tantalum surgical clips can be used for online position verification in treatment of the lumpectomy cavity (LC) in breast cancer patients. Tantalum is a high density metal that could be visible on Electronic Portal Images (EPIs) and be an affordable alternative to gold markers. Clips are considered more representative for the LC position than nearby bony structures. Methods: In twelve patients the surgeon had placed 2 to 5 tantalum clips in the LC. The AP and lateral fields used for portal imaging, were adapted. In doing so, both bony structures and tantalum clips were visible on EPIs. The following analyses were performed:1. Image degradation, with respect to delineating the CTV, of the axial CT slices by artefacts because of the tantalum clips was evaluated by a radiation oncologist;2. The visibility of the tantalum clips on the EPIs was evaluated by four radiation therapists (RTTs);3. Bony anatomy and tantalum clip matches were performed on the same images independently by two observers. Results: 1. Delineation of the CTV by the radiation oncologist was not hampered by CT image artefacts because of the clips.2. The mean score for visibility of the clips on the EPIs, analysed by the four RTTs, was 5.6 on a scale of 10 (range 3.9 8.0).3. In total 12 patients with 16 fractions each were analysed. The differences between clip match and bone match are significant with a mean vector length of 5.2 mm (SD 1.9 mm) for the difference. Conclusion: Results of matches on tantalum clips as compared to matches on bony structures differ substantially. Therefore clip matches can result in smaller CTV to PTV margins than bone matches. Visibility of the clips on EPIs is sufficient, so they can be an alternative to gold markers.

  3. SU-E-T-506: Dosimetric Verification of Photon MLC Delivered Electron Fields for Implementing MERT On An Artiste Linac

    SciTech Connect (OSTI)

    Jin, L; Eldib, A; Li, J; Wang, L; Ma, C; Fan, J

    2014-06-01

    Purpose: To verify the dose accuracy of photon MLC delivered electron fields for implementing energy-intensity modulated electron radiotherapy (MERT) on an Artiste linac. Methods: It was proposed to deliver MERT on an Artiste linac at a short SSD (60 cm) to reduce beam penumbra caused by electron scatters. An in-house developed Monte Carlo (MC)-based dose calculation/optimization planning code was used for treatment planning. Our previous study showed that the measured dose distribution of a breast plan showed good agreement with the calculations in low-medium dose regions while the differences in high dose regions were outstanding. A continuous work found that the discrepancy is mainly caused by improper modeling in MC for the single focused MLC in the Artiste which was simplified as double focused in the previous MC simulations. With this remodeled MLC in the calculations, an energy-intensity modulated electron plan using 6, 9, 12 and 15 MeV was generated for a breast treatment on a breast phantom at a 60 cm SSD and recalculated regarding a solid water phantom. For a test study, four of MLC segments (each with a different energy) generated in the plan were delivered to the phantom and a film measurement was performed at the depth of 2 cm. The measured 2D dose distribution was then compared with calculations. Results: For composite doses of the four segments, measured 2D dose distributions overall agree well with the calculations (3mm/3%) in most area. The separate measurement for a single MLC segment for each of energies also showed the consistence with the calculations. Conclusion: After remodeling MLC in the MC calculations, the measured dose distribution for a subset of MLC segments from a MERT plan showed good agreement. Further detailed verification for the full plan will be the work in the next step.

  4. SU-F-BRE-04: Construction of 3D Printed Patient Specific Phantoms for Dosimetric Verification Measurements

    SciTech Connect (OSTI)

    Ehler, E; Higgins, P; Dusenbery, K

    2014-06-15

    Purpose: To validate a method to create per patient phantoms for dosimetric verification measurements. Methods: Using a RANDO phantom as a substitute for an actual patient, a model of the external features of the head and neck region of the phantom was created. A phantom was used instead of a human for two reasons: to allow for dosimetric measurements that would not be possible in-vivo and to avoid patient privacy issues. Using acrylonitrile butadiene styrene thermoplastic as the building material, a hollow replica was created using the 3D printer filled with a custom tissue equivalent mixture of paraffin wax, magnesium oxide, and calcium carbonate. A traditional parallel-opposed head and neck plan was constructed. Measurements were performed with thermoluminescent dosimeters in both the RANDO phantom and in the 3D printed phantom. Calculated and measured dose was compared at 17 points phantoms including regions in high and low dose regions and at the field edges. On-board cone beam CT was used to localize both phantoms within 1mm and 1 prior to radiation. Results: The maximum difference in calculated dose between phantoms was 1.8% of the planned dose (180 cGy). The mean difference between calculated and measured dose in the anthropomorphic phantom and the 3D printed phantom was 1.9% 2.8% and ?0.1% 4.9%, respectively. The difference between measured and calculated dose was determined in the RANDO and 3D printed phantoms. The differences between measured and calculated dose in each respective phantom was within 2% for 12 of 17 points. The overlap of the RANDO and 3D printed phantom was 0.956 (Jaccard Index). Conclusion: A custom phantom was created using a 3D printer. Dosimetric calculations and measurements showed good agreement between the dose in the RANDO phantom (patient substitute) and the 3D printed phantom.

  5. SU-E-T-138: Dosimetric Verification For Volumetric Modulated Arc Therapy Cranio-Spinal Irradiation Technique

    SciTech Connect (OSTI)

    Goksel, E; Bilge, H; Yildiz, Yarar

    2014-06-01

    Purpose: Dosimetric feasibility of cranio-spinal irradiation with volumetric modulated arc therapy (VMAT-CSI) technique in terms of dose distribution accuracy was investigated using a humanlike phantom. Methods: The OARs and PTV volumes for the Rando phantom were generated on supine CT images. Eclipse (version 8.6) TPS with AAA algorithm was used to create the treatment plan with VMAT-CSI technique. RapidArc plan consisted of cranial, upper spinal (US) and lower spinal (LS) regions that were optimized in the same plan. US field was overlapped by 3cm with cranial and LS fields. Three partial arcs for cranium and 1 full arc for each US and LS region were used. The VMAT-CSI dose distribution inside the Rando phantom was measured with thermoluminescent detectors (TLD) and film dosimetry, and was compared to the calculated doses of field junctions, target and OARs. TLDs were placed at 24 positions throughout the phantom. The measured TLD doses were compared to the calculated point doses. Planar doses for field junctions were verified with Gafchromic films. Films were analyzed in PTW Verisoft application software using gamma analysis method with the 4 mm distance to agreement (DTA) and 4% dose agreement criteria. Results: TLD readings demonstrated accurate dose delivery, with a median dose difference of -0.3% (range: -8% and 12%) when compared with calculated doses for the areas inside the treatment portal. The maximum dose difference was 12% higher in testicals that are outside the treatment region and 8% lower in lungs where the heterogeinity was higher. All planar dose verifications for field junctions passed the gamma analysis and measured planar dose distributions demonstrated average 97% agreement with calculated doses. Conclusion: The dosimetric data verified with TLD and film dosimetry shows that VMAT-CSI technique provides accurate dose distribution and can be delivered safely.

  6. NUMERICAL VERIFICATION OF THE RELAP-7 CORE CHANNEL SINGLE-PHASE MODEL

    SciTech Connect (OSTI)

    Haihua Zhao; Ling Zou; Hongbin Zhang; Richard Martineau

    2014-06-01

    The RELAP-7 code is the next generation of nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). All the physics in RELAP-7 are fully coupled and the errors resulted from the traditional operator-splitting approach are eliminated. By using 2nd order methods in both time and space and eliminating operator-splitting errors, the numerical error of RELAP-7 can be minimized. Numerical verification is the process to verify the orders of numerical methods. It is an important part of modern verification and validation process. The core channel component in RELAP-7 is designed to simulate coolant flow as well as the conjugated heat transfer between coolant flow and the fuel rod. A special treatment at fuel centerline to avoid numerical singularity for the cylindrical heat conduction in the continuous finite element mesh is discussed. One steady state test case and one fast power up transient test case are utilized for the verification of the core channel model with single-phase flow. Analytical solution for the fuel pin temperature and figures of merit such as peak clad temperature and peak fuel temperature are used to define numerical errors. These cases prove that the mass and energy are well conserved and 2nd order convergence rates for both time and space are achieved in the core channel model.

  7. Evaluation of GafChromic EBT prototype B for external beam dose verification

    SciTech Connect (OSTI)

    Todorovic, M.; Fischer, M.; Cremers, F.; Thom, E.; Schmidt, R.

    2006-05-15

    The capability of the new GafChromic EBT prototype B for external beam dose verification is investigated in this paper. First the general characteristics of this film (dose response, postirradiation coloration, influence of calibration field size) were derived using a flat-bed scanner. In the dose range from 0.1 to 8 Gy, the sensitivity of the EBT prototype B film is ten times higher than the response of the GafChromic HS, which so far was the GafChromic film with the highest sensitivity. Compared with the Kodak EDR2 film, the response of the EBT is higher by a factor of 3 in the dose range from 0.1 to 8 Gy. The GafChromic EBT almost does not show a temporal growth of the optical density and there is no influence of the chosen calibration field size on the dose response curve obtained from this data. A MatLab program was written to evaluate the two-dimensional dose distributions from treatment planning systems and GafChromic EBT film measurements. Verification of external beam therapy (SRT, IMRT) using the above-mentioned approach resulted in very small differences between the planned and the applied dose. The GafChromic EBT prototype B together with the flat-bed scanner and MatLab is a successful approach for making the advantages of the GafChromic films applicable for verification of external beam therapy.

  8. Measurement and verification protocols -- Facts and fiction, news from the field

    SciTech Connect (OSTI)

    Schiller, S.R.; Kromer, J.S.

    1998-07-01

    This paper provides descriptions of the 1997 International Performance Measurement and Verification Protocol (IPMVP), the 1996 Federal Energy Management Program's (FEMP) Measurement Verification Guidelines, and the draft ASHRAE 13-P Measurement of Energy and Demand Savings Guideline. These protocols and guidelines are establishing a framework for measurement and verification (M and V) activities throughout the world. The M and V protocols are also being used by the energy performance contracting industry as an educational tool and as the starting point for program specific M and V guidelines. Beyond descriptions of the documents the paper covers how the documents are being sued and the perspective of various user groups--such as government entities, utilities, private companies, and energy services companies. The protocols were designed around four main M and V options to allow flexibility in their application to different types of projects. However, this intentional flexibility has caused confusion among some users who are now required to select the appropriate option, method, level or rigor, and accuracy for their projects. Eventually though, as the protocols are more widely used and more documentation is available on M and V costs and accuracy the industry will become more comfortable selecting the best option and applying the M and V protocols in a more consistent manner for different types of projects and programs.

  9. LLNL`s partnership with selected US mines, for CTBT verification: A pictorial and some reflections

    SciTech Connect (OSTI)

    Heuze, F.E.

    1996-01-01

    The verification of an upcoming Comprehensive Test Ban Treaty (CTBT) will involve seismic monitoring and will provide for on-site inspections which may include drilling. Because of the fact that mining operations can send out strong seismic signals, many mining districts in the US and abroad may come under special scrutiny. The seismic signals can be generated by the use of large quantities of conventional explosives, by the collapse of underground workings, or by sudden energy release in the ground such as in rock bursts and coal bumps. These mining activities may be the cause of false alarms, but may also offer opportunities for evasive nuclear testing. So in preparing for future verification of a CTBT it becomes important to address the mining-related questions. For the United States, these are questions to be answered with respect to foreign mines. But there is a good amount of commonality in mining methods worldwide. Studies conducted at US mine sites can provide good analogs of activities that may be carried out for overseas CTBT verification, save for the expected logistical impediments.

  10. Weldability of general purpose heat source new-process iridium

    SciTech Connect (OSTI)

    Kanne, W.R.

    1987-01-01

    Weldability tests on General Purpose Heat Source (GPHS) iridium capsules showed that a new iridium fabrication process reduced susceptibility to underbead cracking. Seventeen capsules were welded (a total of 255 welds) in four categories and the number of cracks in each weld was measured.

  11. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 1, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    SciTech Connect (OSTI)

    E.M. Harpenau

    2010-12-15

    5098-SR-05-0 PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 1 BROOKHAVEN NATIONAL LABORATORY

  12. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 5, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-11-03

    5098-SR-04-0 PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 5, BROOKHAVEN NATIONAL LABORATORY

  13. Feasibility study of a dual detector configuration concept for simultaneous megavoltage imaging and dose verification in radiotherapy

    SciTech Connect (OSTI)

    Deshpande, Shrikant; McNamara, Aimee L.; Holloway, Lois; Metcalfe, Peter; Vial, Philip

    2015-04-15

    Purpose: To test the feasibility of a dual detector concept for comprehensive verification of external beam radiotherapy. Specifically, the authors test the hypothesis that a portal imaging device coupled to a 2D dosimeter provides a system capable of simultaneous imaging and dose verification, and that the presence of each device does not significantly detract from the performance of the other. Methods: The dual detector configuration comprised of a standard radiotherapy electronic portal imaging device (EPID) positioned directly on top of an ionization-chamber array (ICA) with 2 cm solid water buildup material (between EPID and ICA) and 5 cm solid backscatter material. The dose response characteristics of the ICA and the imaging performance of the EPID in the dual detector configuration were compared to the performance in their respective reference clinical configurations. The reference clinical configurations were 6 cm solid water buildup material, an ICA, and 5 cm solid water backscatter material as the reference dosimetry configuration, and an EPID with no additional buildup or solid backscatter material as the reference imaging configuration. The dose response of the ICA was evaluated by measuring the detectors response with respect to off-axis position, field size, and transit object thickness. Clinical dosimetry performance was evaluated by measuring a range of clinical intensity-modulated radiation therapy (IMRT) beams in transit and nontransit geometries. The imaging performance of the EPID was evaluated quantitatively by measuring the contrast-to-noise ratio (CNR) and spatial resolution. Images of an anthropomorphic phantom were also used for qualitative assessment. Results: The measured off-axis and field size response with the ICA in both transit and nontransit geometries for both dual detector configuration and reference dosimetry configuration agreed to within 1%. Transit dose response as a function of object thickness agreed to within 0.5%. All

  14. Hybrid Enrichment Assay Methods for a UF6 Cylinder Verification Station: FY10 Progress Report

    SciTech Connect (OSTI)

    Smith, Leon E.; Jordan, David V.; Orton, Christopher R.; Misner, Alex C.; Mace, Emily K.

    2010-08-01

    Pacific Northwest National Laboratory (PNNL) is developing the concept of an automated UF6 cylinder verification station that would be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until the arrival of International Atomic Energy Agency (IAEA) inspectors. At the center of this unattended system is a hybrid enrichment assay technique that combines the traditional enrichment-meter method (based on the 186 keV peak from 235U) with non-traditional neutron-induced high-energy gamma-ray signatures (spawned primarily by 234U alpha emissions and 19F(alpha, neutron) reactions). Previous work by PNNL provided proof-of-principle for the non-traditional signatures to support accurate, full-volume interrogation of the cylinder enrichment, thereby reducing the systematic uncertainties in enrichment assay due to UF6 heterogeneity and providing greater sensitivity to material substitution scenarios. The work described here builds on that preliminary evaluation of the non-traditional signatures, but focuses on a prototype field system utilizing NaI(Tl) and LaBr3(Ce) spectrometers, and enrichment analysis algorithms that integrate the traditional and non-traditional signatures. Results for the assay of Type-30B cylinders ranging from 0.2 to 4.95 wt% 235U, at an AREVA fuel fabrication plant in Richland, WA, are described for the following enrichment analysis methods: 1) traditional enrichment meter signature (186 keV peak) as calculated using a square-wave convolute (SWC) algorithm; 2) non-traditional high-energy gamma-ray signature that provides neutron detection without neutron detectors and 3) hybrid algorithm that merges the traditional and non-traditional signatures. Uncertainties for each method, relative to the declared enrichment for each cylinder, are calculated and compared to the uncertainties from an attended

  15. SPSP Phase III Recruiting, Selecting, and Developing Secure Power Systems Professionals: Behavioral Interview Guidelines by Job Roles

    SciTech Connect (OSTI)

    O'Neil, Lori Ross; Conway, T. J.; Tobey, D. H.; Greitzer, Frank L.; Dalton, Angela C.; Pusey, Portia K.

    2015-03-01

    The Secure Power Systems Professional Phase III final report was released last year which an appendix of Behavioral Interview Guidelines by Job Roles. This new report is that appendix broken out as a standalone document to assist utilities in recruiting and developing Secure Power Systems Professionals at their site.

  16. CRUSH TESTING OF 9977 GENERAL PURPOSE FISSILE PACKAGINGS

    SciTech Connect (OSTI)

    Smith, A.

    2010-07-28

    The 9977 General Purpose Fissile Package (GPFP) was designed in response to the adoption of the crush test requirement in the US regulations for packages for radioactive materials (10 CFR 71). This presentation on crush testing of the 9977 GPFP Reviews origins of Crush Test Requirements and implementation of crush test requirements in 10 CFR 71. SANDIA testing performed to support the rule making is reviewed. The differences in practice, on the part of the US Department of Energy from those required by the NRC for commercial purposes, are explained. The design features incorporated into the 9977 GPFP to enable it to withstand the crush test and the crush tests performed on the 9977 are described. Lessons learned from crush testing of GPFP packagings are given.

  17. Demand-side management program evaluation and the EPA Conservation Verification Protocols. Final report

    SciTech Connect (OSTI)

    Willems, P.; Ciraulo, J.; Smith, B.

    1993-11-01

    The US Environmental Protection Agency (EPA) Conservation Verification Protocols (CVPs) are a set of step-by-step procedures for impact monitoring and evaluation of electric utility demand-side management (DSM) programs. The EPA developed these protocols as part of its mission to implement the Acid Rain Program authorized by Title IV of the Clean Air Amendments of 1990. This report provides an overview of the CVPs and how they can be used by electric utilities in DSM program monitoring and evaluation. Both the CVPs Monitoring Path and Stipulated Path procedures are summarized and reviewed. Several examples are provided to illustrate how to calculate DSM program energy savings using the CVPSs.

  18. Verification of Multiphysics software: Space and time convergence studies for nonlinearly coupled applications

    SciTech Connect (OSTI)

    Jean C. Ragusa; Vijay Mahadevan; Vincent A. Mousseau

    2009-05-01

    High-fidelity modeling of nuclear reactors requires the solution of a nonlinear coupled multi-physics stiff problem with widely varying time and length scales that need to be resolved correctly. A numerical method that converges the implicit nonlinear terms to a small tolerance is often referred to as nonlinearly consistent (or tightly coupled). This nonlinear consistency is still lacking in the vast majority of coupling techniques today. We present a tightly coupled multiphysics framework that tackles this issue and present code-verification and convergence analyses in space and time for several models of nonlinear coupled physics.

  19. Results of Remediation and Verification Sampling for the 600-270 Horseshoe Landfill

    SciTech Connect (OSTI)

    W. S. Thompson

    2005-12-14

    This report presents the results of the 2005 remedial action and verification soil sampling conducted at the 600-270 waste site after removal of soil containing residual concentrations of dichlorodiphenyl trichloroethane and its breakdown products dichlorodiphenyl dichloroethylene and dichlorodiphenyl dichloroethane. The remediation was performed in response to post-closure surface soil sampling performed between 1998 and 2003 that indicated the presence of residual DDT contamination exceeding the Record of Decision for the 1100 Area National Priorities List site cleanup criteria of 1 mg/kg that was established for the original 1994 cleanup activities.

  20. Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

    SciTech Connect (OSTI)

    Richman, Eric E.

    2012-10-31

    This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

  1. Surface harmonics method equations for solving the time-dependent neutron transport problems and their verification

    SciTech Connect (OSTI)

    Boyarinov, V. F.; Kondrushin, A. E.; Fomichenko, P. A.

    2012-07-01

    Finite-difference time-dependent equations of Surface Harmonics method have been obtained for plane geometry. Verification of these equations has been carried out by calculations of tasks from 'Benchmark Problem Book ANL-7416'. The capacity and efficiency of the Surface Harmonics method have been demonstrated by solution of the time-dependent neutron transport equation in diffusion approximation. The results of studies showed that implementation of Surface Harmonics method for full-scale calculations will lead to a significant progress in the efficient solution of the time-dependent neutron transport problems in nuclear reactors. (authors)

  2. Specification of Selected Performance Monitoring and Commissioning Verification Algorithms for CHP Systems

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2006-10-06

    Pacific Northwest National Laboratory (PNNL) is assisting the U.S. Department of Energy (DOE) Distributed Energy (DE) Program by developing advanced control algorithms that would lead to development of tools to enhance performance and reliability, and reduce emissions of distributed energy technologies, including combined heat and power technologies. This report documents phase 2 of the program, providing a detailed functional specification for algorithms for performance monitoring and commissioning verification, scheduled for development in FY 2006. The report identifies the systems for which algorithms will be developed, the specific functions of each algorithm, metrics which the algorithms will output, and inputs required by each algorithm.

  3. Thermal Hydraulic Modeling: Cross-Verification, Validation, and Co-Design |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne Leadership Computing Facility Velocity magnitude distribution in a flow through the 25-pin swirl-vane spacer grid of Matis benchmark Velocity magnitude distribution in a flow through the 25-pin swirl-vane spacer grid of Matis benchmark. Computed on Intrepid with Nek5000 and visualized on Eureka with VisIt at the ALCF. Aleks Obabko, Paul Fischer, and Tim Tautges, Argonne National Laboratory Thermal Hydraulic Modeling: Cross-Verification, Validation, and Co-Design PI Name: Paul Fischer

  4. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    SciTech Connect (OSTI)

    Jackson, K.; Al-Ayat, R.; Walter, W. R.

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  5. Regulation Identifier Number Title/Subject/Purpose Rule Type

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7/21/2016. Highlighted areas denote changes from the last update. Regulation Identifier Number Title/Subject/Purpose Rule Type Status 1990-AA40 Adminstrative Requirements for Other Transactions: revise requirements for technology investment agreements to broaden to support all types of other transactions. NOPR Drafting Notice of Proposed Rule-making for Federal Register 1901-AB37 Enforcement of Classified Information Security Requirements: Amend DOE's statutory prescribed regulation, which set

  6. Chapter 1 - Introduction and Statement of Purpose and Need

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1-1 CHAPTER 1 INTRODUCTION AND STATEMENT OF PURPOSE AND NEED The U.S. Department of Energy (DOE) is proposing to construct and operate an Actinide Chemistry and Repository Science Laboratory (ACRSL) to support chemical research activities related to the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. The laboratory would be located on New Mexico State University property adjacent to the existing Carlsbad Environmental Monitoring and Research Center (CEMRC) in Carlsbad, New Mexico.

  7. Verification and Validation of the PLTEMP/ANL Code for Thermal-Hydraulic Analysis of Experimental and Test Reactors

    SciTech Connect (OSTI)

    Kalimullah, M.; Olson, Arne P.; Feldman, E. E.; Hanan, N.; Dionne, B.

    2015-04-07

    The document compiles in a single volume several verification and validation works done for the PLTEMP/ANL code during the years of its development and improvement. Some works that are available in the open literature are simply referenced at the outset, and are not included in the document. PLTEMP has been used in conversion safety analysis reports of several US and foreign research reactors that have been licensed and converted. A list of such reactors is given. Each chapter of the document deals with the verification or validation of a specific model. The model verification is usually done by comparing the code with hand calculation, Microsoft spreadsheet calculation, or Mathematica calculation. The model validation is done by comparing the code with experimental data or a more validated code like the RELAP5 code.

  8. Approach to IAEA verification of the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP)

    SciTech Connect (OSTI)

    Gordon, D.M.; Sanborn, J.B.; Younkin, J.M.; DeVito, V.J.

    1982-01-01

    This paper describes a potential approach by which the International Atomic Energy Agency (IAEA) might verify the nuclear-material balance at the Portsmouth Gas Centrifuge Enrichment Plant (GCEP), should that plant be placed under IAEA safeguards. The strategy makes use of the attributes and variables measurement verification approach, whereby the IAEA would perform independent measurements on a randomly selected subset of the items comprising the U-235 flows and inventories at the plant. In addition, the MUF-D statistic is used as the test statistics for the detection of diversion. The paper includes descriptions of the potential verification activities, as well as calculations of (a) attributes and variables sample sizes for the various strata, (b) standard deviations of the relevant test statistics, and (c) the sensitivity for detection of diversion which the IAEA might achieve by this verification strategy at GCEP.

  9. The Mailbox Computer System for the IAEA verification experiment on HEU downlending at the Portsmouth Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Aronson, A.L.; Gordon, D.M.

    2000-07-31

    IN APRIL 1996, THE UNITED STATES (US) ADDED THE PORTSMOUTH GASEOUS DIFFUSION PLANT TO THE LIST OF FACILITIES ELIGIBLE FOR THE APPLICATION OF INTERNATIONAL ATOMIC ENERGY AGENCY (IAEA) SAFEGUARDS. AT THAT TIME, THE US PROPOSED THAT THE IAEA CARRY OUT A ''VERIFICATION EXPERIMENT'' AT THE PLANT WITH RESPECT TO DOOWNBLENDING OF ABOUT 13 METRIC TONS OF HIGHLY ENRICHED URANIUM (HEU) IN THE FORM OF URANIUM HEXAFLUROIDE (UF6). DURING THE PERIOD DECEMBER 1997 THROUGH JULY 1998, THE IAEA CARRIED OUT THE REQUESTED VERIFICATION EXPERIMENT. THE VERIFICATION APPROACH USED FOR THIS EXPERIMENT INCLUDED, AMONG OTHER MEASURES, THE ENTRY OF PROCESS-OPERATIONAL DATA BY THE FACILITY OPERATOR ON A NEAR-REAL-TIME BASIS INTO A ''MAILBOX'' COMPUTER LOCATED WITHIN A TAMPER-INDICATING ENCLOSURE SEALED BY THE IAEA.

  10. treaty verification

    National Nuclear Security Administration (NNSA)

    eld-field-page-name">

    Page Name:
    gms

  11. Ion mobility spectrometer, spectrometer analyte detection and identification verification system, and method

    DOE Patents [OSTI]

    Atkinson, David A.

    2002-01-01

    Methods and apparatus for ion mobility spectrometry and analyte detection and identification verification system are disclosed. The apparatus is configured to be used in an ion mobility spectrometer and includes a plurality of reactant reservoirs configured to contain a plurality of reactants which can be reacted with the sample to form adducts having varying ion mobilities. A carrier fluid, such as air or nitrogen, is used to carry the sample into the spectrometer. The plurality of reactants are configured to be selectively added to the carrier stream by use inlet and outlet manifolds in communication with the reagent reservoirs, the reservoirs being selectively isolatable by valves. The invention further includes a spectrometer having the reagent system described. In the method, a first reactant is used with the sample. Following a positive result, a second reactant is used to determine whether a predicted response occurs. The occurrence of the second predicted response tends to verify the existence of a component of interest within the sample. A third reactant can also be used to provide further verification of the existence of a component of interest. A library can be established of known responses of compounds of interest with various reactants and the results of a specific multi-reactant survey of a sample can be compared against the library to determine whether a component detected in the sample is likely to be a specific component of interest.

  12. Double-Difference Tomography for Sequestration MVA [monitoring, verification, and accounting

    SciTech Connect (OSTI)

    Westman, Erik

    2012-12-31

    Analysis of synthetic data was performed to determine the most cost-effective tomographic monitoring system for a geologic carbon sequestration injection site. Double-difference tomographic inversion was performed on 125 synthetic data sets: five stages of CO2 plume growth, five seismic event regions, and five geophone arrays. Each resulting velocity model was compared quantitatively to its respective synthetic velocity model to determine an accuracy value. The results were examined to determine a relationship between cost and accuracy in monitoring, verification, and accounting applications using double-difference tomography. The geophone arrays with widely-varying geophone locations, both laterally and vertically, performed best. Additionally, double difference seismic tomography was performed using travel time data from a carbon sequestration site at the Aneth oil field in southeast Utah as part of a Department of Energy initiative on monitoring, verification, and accounting (MVA) of sequestered CO2. A total of 1,211 seismic events were recorded from a borehole array consisting of 22 geophones. Artificial velocity models were created to determine the ease with which different CO2 plume locations and sizes can be detected. Most likely because of the poor geophone arrangement, a low velocity zone in the Desert Creek reservoir can only be detected when regions of test site containing the highest ray path coverage are considered. MVA accuracy and precision may be improved through the use of a receiver array that provides more comprehensive ray path coverage.

  13. Sealing of process valves for the HEU downblending verification experiment at Portsmouth

    SciTech Connect (OSTI)

    Baldwin, G.T.; Bartberger, J.C.; Jenkins, C.D.; Perlinski, A.W.; Schoeneman, J.L.; Gordon, D.M.; Whiting, N.E.; Bonner, T.N.; Castle, J.M.

    1998-07-01

    At the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio, USA, excess inventory of highly-enriched uranium (HEU) from US defense programs is being diluted to low-enriched uranium (LEU) for commercial use. The conversion is subject to a Verification Experiment overseen by the International Atomic Energy Agency (IAEA). The Verification Experiment is making use of monitoring technologies developed and installed by several DOE laboratories. One of the measures is a system for sealing valves in the process piping, which secures the path followed by uranium hexafluoride gas (UF{sub 6}) from cylinders at the feed stations to the blend point, where the HEU is diluted with LEU. The Authenticated Item Monitoring System (AIMS) was the alternative proposed by Sandia National Laboratories that was selected by the IAEA. Approximately 30 valves were sealed by the IAEA using AIMS fiber-optic seals (AFOS). The seals employ single-core plastic fiber rated to 125 C to withstand the high-temperature conditions of the heated piping enclosures at Portsmouth. Each AFOS broadcasts authenticated seal status and state-of-health messages via a tamper-protected radio-frequency transmitter mounted outside of the heated enclosure. The messages are received by two collection stations, operated redundantly.

  14. Safeguards Verification Measurements using Laser Ablation, Absorbance Ratio Spectrometry in Gaseous Centrifuge Enrichment Plants

    SciTech Connect (OSTI)

    Anheier, Norman C.; Cannon, Bret D.; Kulkarni, Gourihar R.; Munley, John T.; Nelson, Danny A.; Qiao, Hong; Phillips, Jon R.

    2012-07-17

    Laser Ablation Absorbance Ratio Spectrometry (LAARS) is a new verification measurement technology under development at the US Department of Energy (DOE) Pacific Northwest National Laboratory (PNNL). LAARS uses three lasers to ablate and then measure the relative isotopic abundance of uranium compounds. An ablation laser is tightly focused on uranium-bearing solids, producing a small atomic uranium vapor plume. Two collinear wavelength-tuned spectrometry lasers transit through the plume and the absorbance of U-235 and U-238 isotopes are measured to determine U-235 enrichment. The measurement is independent of chemical form and degree of dilution with nuisance dust and other materials. LAARS has high relative precision and detection limits approaching the femtogram range for U-235. The sample is scanned and assayed point-by-point at rates reaching 1 million measurements/hour, enabling LAARS to detect and analyze uranium in trace samples. The spectrometer is assembled using primarily commercially available components and features a compact design and automated analysis.Two specific gaseous centrifuge enrichment plant (GCEP) applications of the spectrometer are currently under development: 1) LAARS-Environmental Sampling (ES), which collects and analyzes aerosol particles for GCEP misuse detection and 2) LAARS-Destructive Assay (DA), which enables onsite enrichment DA sample collection and analysis for protracted diversion detection. The two applications propose game-changing technological advances in GCEP safeguards verification.

  15. Neutron spectrometry for UF6 enrichment verification in storage cylinders

    SciTech Connect (OSTI)

    Mengesha, Wondwosen; Kiff, Scott D.

    2015-01-29

    Verification of declared UF6 enrichment and mass in storage cylinders is of great interest in nuclear material nonproliferation. Nondestructive assay (NDA) techniques are commonly used for safeguards inspections to ensure accountancy of declared nuclear materials. Common NDA techniques used include gamma-ray spectrometry and both passive and active neutron measurements. In the present study, neutron spectrometry was investigated for verification of UF6 enrichment in 30B storage cylinders based on an unattended and passive measurement approach. MCNP5 and Geant4 simulated neutron spectra, for selected UF6 enrichments and filling profiles, were used in the investigation. The simulated neutron spectra were analyzed using principal component analysis (PCA). The PCA technique is a well-established technique and has a wide area of application including feature analysis, outlier detection, and gamma-ray spectral analysis. Results obtained demonstrate that neutron spectrometry supported by spectral feature analysis has potential for assaying UF6 enrichment in storage cylinders. The results from the present study also showed that difficulties associated with the UF6 filling profile and observed in other unattended passive neutron measurements can possibly be overcome using the approach presented.

  16. Neutron spectrometry for ${\\rm UF}_6$ enrichment verification in storage cylinders

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mengesha, Wondwosen; Kiff, Scott D.

    2015-01-29

    Verification of declared UF6 enrichment and mass in storage cylinders is of great interest in nuclear material nonproliferation. Nondestructive assay (NDA) techniques are commonly used for safeguards inspections to ensure accountancy of declared nuclear materials. Common NDA techniques used include gamma-ray spectrometry and both passive and active neutron measurements. In the present study, neutron spectrometry was investigated for verification of UF6 enrichment in 30B storage cylinders based on an unattended and passive measurement approach. MCNP5 and Geant4 simulated neutron spectra, for selected UF6 enrichments and filling profiles, were used in the investigation. The simulated neutron spectra were analyzed using principalmorecomponent analysis (PCA). The PCA technique is a well-established technique and has a wide area of application including feature analysis, outlier detection, and gamma-ray spectral analysis. Results obtained demonstrate that neutron spectrometry supported by spectral feature analysis has potential for assaying UF6 enrichment in storage cylinders. The results from the present study also showed that difficulties associated with the UF6 filling profile and observed in other unattended passive neutron measurements can possibly be overcome using the approach presented.less

  17. LABORATORY DEMONSTRATION OF A MULTISENSOR UNATTENDED CYLINDER VERIFICATION STATION FOR URANIUM ENRICHMENT PLANT SAFEGUARDS

    SciTech Connect (OSTI)

    Goodman, David I; Rowland, Kelly L; Smith, Sheriden; Miller, Karen A.; Flynn, Eric B.

    2014-01-10

    The objective of safeguards is the timely detection of the diversion of a significant quantity of nuclear materials, and safeguarding uranium enrichment plants is especially important in preventing the spread of nuclear weapons. The IAEA’s proposed Unattended Cylinder Verification Station (UCVS) for UF6 cylinder verification would combine the operator’s accountancy scale with a nondestructive assay system such as the Passive Neutron Enrichment Meter (PNEM) and cylinder identification and surveillance systems. In this project, we built a laboratory-scale UCVS and demonstrated its capabilities using mock UF6 cylinders. We developed a signal processing algorithm to automate the data collection and processing from four continuous, unattended sensors. The laboratory demonstration of the system showed that the software could successfully identify cylinders, snip sensor data at the appropriate points in time, determine the relevant characteristics of the cylinder contents, check for consistency among sensors, and output the cylinder data to a file. This paper describes the equipment, algorithm and software development, laboratory demonstration, and recommendations for a full-scale UCVS.

  18. Disarmament and disclosure: How arms control verification can proceed without threatening confidential business information

    SciTech Connect (OSTI)

    Kellman, B.; Gualtieri, D.S.; Tanzman, E.A.

    1995-12-31

    International security requires reductions in the quantity and availability of catastrophic weaponry. Arms control negotiators are responding to this challenge by finalizing pivotal new initiatives. This progress should, however, be met with more than mere applause--the implications of arms control must be understood, potential problems must be identified, and solutions must be proposed. In this Article, the authors examine an issue raised by the strategic Arms Reduction Treaty (START) and the Chemical Weapons Convention (CWC): how to verify compliance while protecting confidential business information (CBI). The concern is that the verification of arms control treaties requires the ability to investigate private industrial activities, and that this requirement risks revelation of valuable information in an uncertain legal environment. Since cooperation from the private sector is essential to the implementation of these treaties, methods must be devised to assure industries of the sanctity of their commercial information. The Article consists of three additional parts. Part 2 describes in detail the modalities of arms control verification, focusing on two recently signed agreements: the Strategic Arms Reduction Treaty and the Chemical Weapons Convention. Parts 3 and 4 address the threat that verifying these treaties poses to the confidentiality of valuable information. Part 3 considers problems of CBI loss due to the activities of inspectors and officials gaining access to private information. Part 4 considers the possibility that CBI will be lost due to the operation of US law. Each part suggests strategies to protect CBI and provides examples of relevant federal legislation.

  19. Verification and Validation of Carbon-Fiber Laminate Low Velocity Impact Simulations.

    SciTech Connect (OSTI)

    English, Shawn Allen; Nelson, Stacy Michelle; Briggs, Timothy; Brown, Arthur

    2014-10-01

    Presented is a model verification and validation effort using low - velocity impact (LVI) of carbon fiber reinforced polymer laminate experiments. A flat cylindrical indenter impacts the laminate with enough energy to produce delamination, matrix cracks and fiber breaks. Included in the experimental efforts are ultrasonic scans of the damage for qualitative validation of the models. However, the primary quantitative metrics of validation are the force time history measured through the instrumented indenter and initial and final velocities. The simulations, whi ch are run on Sandia's Sierra finite element codes , consist of all physics and material parameters of importance as determined by a sensitivity analysis conducted on the LVI simulation. A novel orthotropic damage and failure constitutive model that is cap able of predicting progressive composite damage and failure is described in detail and material properties are measured, estimated from micromechanics or optimized through calibration. A thorough verification and calibration to the accompanying experiment s are presented. Specia l emphasis is given to the four - point bend experiment. For all simulations of interest, the mesh and material behavior is verified through extensive convergence studies. An ensemble of simulations incorporating model parameter unc ertainties is used to predict a response distribution which is then compared to experimental output. The result is a quantifiable confidence in material characterization and model physics when simulating this phenomenon in structures of interest.

  20. EXAMINING THE ROLE AND RESEARCH CHALLENGES OF SOCIAL MEDIA AS A TOOL FOR NONPROLIFERATION AND ARMS CONTROL TREATY VERIFICATION

    SciTech Connect (OSTI)

    Henry, Michael J.; Cramer, Nicholas O.; Benz, Jacob M.; Gastelum, Zoe N.; Kreyling, Sean J.; West, Curtis L.

    2014-05-13

    Traditional arms control treaty verification activities typically involve a combination of technical measurements via physical and chemical sensors, state declarations, political agreements, and on-site inspections involving international subject matter experts. However, the ubiquity of the internet, and the electronic sharing of data that it enables, has made available a wealth of open source information with the potential to benefit verification efforts. Open source information is already being used by organizations such as the International Atomic Energy Agency to support the verification of state-declared information, prepare inspectors for in-field activities, and to maintain situational awareness . The recent explosion in social media use has opened new doors to exploring the attitudes, moods, and activities around a given topic. Social media platforms, such as Twitter, Facebook, and YouTube, offer an opportunity for individuals, as well as institutions, to participate in a global conversation at minimal cost. Social media data can also provide a more data-rich environment, with text data being augmented with images, videos, and location data. The research described in this paper investigates the utility of applying social media signatures as potential arms control and nonproliferation treaty verification tools and technologies, as determined through a series of case studies. The treaty relevant events that these case studies touch upon include detection of undeclared facilities or activities, determination of unknown events recorded by the International Monitoring System (IMS), and the global media response to the occurrence of an Indian missile launch. The case studies examine how social media can be used to fill an information gap and provide additional confidence to a verification activity. The case studies represent, either directly or through a proxy, instances where social media information may be available that could potentially augment the evaluation

  1. L3:THM.CFD.P9.05 Milestone Report Single/Multiphase CFD Assessment, Verification,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Milestone Report Single/Multiphase CFD Assessment, Verification, and Validation Yidong Xia and Hong Luo North Carolina State University September 30, 2014 CASL-8-2014-0210-000 CASL-U-2014-0210-000 L3:THM.CFD.P9.05 Single/Multiphase CFD assessment, verification, and validation L3:THM.CFD.P9.05 milestone report Yidong Xia and Hong Luo Department of Mechanical and Aerospace Engineering North Carolina State University, Raleigh, NC, 27695, USA CASL-U-2014-0210-000 L3:THM.CFD.P9.05 On the performance

  2. Remaining Sites Verification Package for the 1607-F3 Sanitary Sewer System, Waste Site Reclassification Form 2006-047

    SciTech Connect (OSTI)

    L. M. Dittmer

    2007-04-26

    The 1607-F3 waste site is the former location of the sanitary sewer system that supported the 182-F Pump Station, the 183-F Water Treatment Plant, and the 151-F Substation. The sanitary sewer system included a septic tank, drain field, and associated pipeline, all in use between 1944 and 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  3. Final Report - Independent Verification Survey Report for the Waste Loading Area, Former Hazardous Waste Management Facility, Brookhaven National Laboratory, Upton, New York

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-08-19

    The objective of the verification survey was to obtain evidence by means of measurements and sampling to confirm that the final radiological conditions were less than the established release criteria. This objective was achieved via multiple verification components including document reviews to determine the accuracy and adequacy of FSS documentation.

  4. Recover Act. Verification of Geothermal Tracer Methods in Highly Constrained Field Experiments

    SciTech Connect (OSTI)

    Becker, Matthew W.

    2014-05-16

    The prediction of the geothermal system efficiency is strong linked to the character of the flow system that connects injector and producer wells. If water flow develops channels or “short circuiting” between injection and extraction wells thermal sweep is poor and much of the reservoir is left untapped. The purpose of this project was to understand how channelized flow develops in fracture geothermal reservoirs and how it can be measured in the field. We explored two methods of assessing channelization: hydraulic connectivity tests and tracer tests. These methods were tested at a field site using two verification methods: ground penetrating radar (GPR) images of saline tracer and heat transfer measurements using distributed temperature sensing (DTS). The field site for these studies was the Altona Flat Fractured Rock Research Site located in northeastern New York State. Altona Flat Rock is an experimental site considered a geologic analog for some geothermal reservoirs given its low matrix porosity. Because soil overburden is thin, it provided unique access to saturated bedrock fractures and the ability image using GPR which does not effectively penetrate most soils. Five boreholes were drilled in a “five spot” pattern covering 100 m2 and hydraulically isolated in a single bedding plane fracture. This simple system allowed a complete characterization of the fracture. Nine small diameter boreholes were drilled from the surface to just above the fracture to allow the measurement of heat transfer between the fracture and the rock matrix. The focus of the hydraulic investigation was periodic hydraulic testing. In such tests, rather than pumping or injection in a well at a constant rate, flow is varied to produce an oscillating pressure signal. This pressure signal is sensed in other wells and the attenuation and phase lag between the source and receptor is an indication of hydraulic connection. We found that these tests were much more effective than constant

  5. Special purpose modes in photonic band gap fibers

    DOE Patents [OSTI]

    Spencer, James; Noble, Robert; Campbell, Sara

    2013-04-02

    Photonic band gap fibers are described having one or more defects suitable for the acceleration of electrons or other charged particles. Methods and devices are described for exciting special purpose modes in the defects including laser coupling schemes as well as various fiber designs and components for facilitating excitation of desired modes. Results are also presented showing effects on modes due to modes in other defects within the fiber and due to the proximity of defects to the fiber edge. Techniques and devices are described for controlling electrons within the defect(s). Various applications for electrons or other energetic charged particles produced by such photonic band gap fibers are also described.

  6. RADIOLOGICAL DATA FOR ALARA PLANNING PURPOSES Rev. 1 Contact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RADIOLOGICAL DATA FOR ALARA PLANNING PURPOSES Rev. 1 Contact 1 ft 3 ft 10 ft 25 ft 50 ft 125 ft 100 mR/hr line 5 mR/hr line (R/hr) (R/hr) (R/hr) (R/hr) (R/hr) (R/hr) (R/hr) (feet) (feet) Outside of Cask (max) *Unshielded Liner (max) Top of *Unshielded Liner after the cask lid is removed *Unshielded Liner Inside of Cask/Lid Outside of Cask Lifting rig or any other support equipment Does the cask have fixed contamination that may "leach out" during transport (Yes/No)? If yes, please list

  7. Development of a General Purpose Power System Control Board

    SciTech Connect (OSTI)

    Nam, S.H.; Jeong, S.H.; Kim, S.H.; Kim, S.C.; Park, S.S.; Suh, J.H.; Bellomo, P.; Cassel, R.; Larsen, R.; Nguyen, M.N.; /SLAC

    2007-07-23

    In an effort to control modern solid state power modules, a general purpose, multi function power system control board (PSCB) has been under development as a collaboration project between Pohang Accelerator Laboratory (PAL), Korea, and Stanford Linear Accelerator Center (SLAC), USA. The PSCB is an embedded, interlock supervisory, diagnostic, timing, and set-point control board. It is designed to use in various power systems such as sequenced kicker pulsers, solid state RF modulators, simple DC magnet power supplies, etc. The PSCB has the Ethernet communication with the TCP/IP Modbus protocol.

  8. SU-E-P-35: Real-Time Patient Transit Dose Verification of Volumetric Modulated Arc Radiotherapy by a 2D Ionization Chamber Array

    SciTech Connect (OSTI)

    Liu, X

    2015-06-15

    Purpose: To explore the real-time dose verification method in volumetric modulated arc radiotherapy (VMAT) with a 2D array ion chamber array. Methods: The 2D ion chamber array was fixed on the panel of electronic portal imaging device (EPID). Source-detector distance (SDD)was 140cm. 8mm RW3 solid water was added to the detector panel to achieve maximum readings.The patient plans for esophageal, prostate and liver cancers were selected to deliver on the cylindrical Cheese phantom 5 times in order to validate the reproducibility of doses. Real-time patient transit dose measurements were performed at each fraction. Dose distributions wereevaluated using gamma index criteria of 3mm DTA and 3% dose difference referred to the firsttime Result. Results: The gamma index pass rate in the Cheese phantom were about 98%; The gamma index pass rate for esophageal, liver and prostate cancer patient were about 92%,94%, and 92%, respectively; Gamma pass rate for all single fraction were more than 90%. Conclusion: The 2D array is capable of monitoring the real time transit doses during VMAT delivery. It is helpful to improve the treatment accuracy.

  9. Proceedings of the 22nd Annual DoD/DOE Seismic Research Symposium: Planning for Verification of and Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT)

    SciTech Connect (OSTI)

    Nichols, James W., LTC

    2000-09-15

    These proceedings contain papers prepared for the 22nd Annual DoD/DOE Seismic Research Symposium: Planning for Verification of and Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT), held 13-15 September 2000 in New Orleans, Louisiana. These papers represent the combined research related to ground-based nuclear explosion monitoring funded by the National Nuclear Security Administration (NNSA), Defense Threat Reduction Agency (DTRA), Air Force Technical Applications Center (AFTAC), Department of Defense (DoD), US Army Space and Missile Defense Command, Defense Special Weapons Agency (DSWA), and other invited sponsors. The scientific objectives of the research are to improve the United States capability to detect, locate, and identify nuclear explosions. The purpose of the meeting is to provide the sponsoring agencies, as well as potential users, an opportunity to review research accomplished during the preceding year and to discuss areas of investigation for the coming year. For the researchers, it provides a forum for the exchange of scientific information toward achieving program goals, and an opportunity to discuss results and future plans. Paper topics include: seismic regionalization and calibration; detection and location of sources; wave propagation from source to receiver; the nature of seismic sources, including mining practices; hydroacoustic, infrasound, and radionuclide methods; on-site inspection; and data processing.

  10. Dual-purpose desalting, RO versus MSF an economic comparison

    SciTech Connect (OSTI)

    Brandt, D.C.; Battey, R.F.

    1983-01-01

    Capital and annual operating costs are estimated for producing water using three combinations of seawater reverse osmosis and gas turbines. The costs and operating parameters were developed for Middle East conditions assuming a Red Sea water source. The plants were designed to produce 37,850 m/sup 3//d (10 mgd) of potable water and to export 50,000 kW of power. The reverse osmosis plant utilizes energy recovery and was designed with full pretreatment for a surface water supply. Electricity is provided by either gas turbines, steam turbines, or combined cycle plants. Power and water costs developed for these systems were compared to costs for conventional, dual-purpose MSF/steam turbine plants for the same water and power production. These evaluations considered two levels of fuel costs. The results of this study show the significant effect of fuel costs on process selection and on water and power costs. Capital and operating costs were 20 to 28 percent less and 23 to 33 percent less, respectively, for the RO/gas turbine and RO/combined cycle plants as compared to conventional, dual-purpose MSF steam turbine plants. In addition to economics, the merits of the systems are discussed relative to delivery, ease and flexibility of operation, turndown capability, and so forth.

  11. SU-E-J-58: Dosimetric Verification of Metal Artifact Effects: Comparison of Dose Distributions Affected by Patient Teeth and Implants

    SciTech Connect (OSTI)

    Lee, M; Kang, S; Lee, S; Suh, T; Lee, J; Park, J; Park, H; Lee, B

    2014-06-01

    Purpose: Implant-supported dentures seem particularly appropriate for the predicament of becoming edentulous and cancer patients are no exceptions. As the number of people having dental implants increased in different ages, critical dosimetric verification of metal artifact effects are required for the more accurate head and neck radiation therapy. The purpose of this study is to verify the theoretical analysis of the metal(streak and dark) artifact, and to evaluate dosimetric effect which cause by dental implants in CT images of patients with the patient teeth and implants inserted humanoid phantom. Methods: The phantom comprises cylinder which is shaped to simulate the anatomical structures of a human head and neck. Through applying various clinical cases, made phantom which is closely allied to human. Developed phantom can verify two classes: (i)closed mouth (ii)opened mouth. RapidArc plans of 4 cases were created in the Eclipse planning system. Total dose of 2000 cGy in 10 fractions is prescribed to the whole planning target volume (PTV) using 6MV photon beams. Acuros XB (AXB) advanced dose calculation algorithm, Analytical Anisotropic Algorithm (AAA) and progressive resolution optimizer were used in dose optimization and calculation. Results: In closed and opened mouth phantom, because dark artifacts formed extensively around the metal implants, dose variation was relatively higher than that of streak artifacts. As the PTV was delineated on the dark regions or large streak artifact regions, maximum 7.8% dose error and average 3.2% difference was observed. The averaged minimum dose to the PTV predicted by AAA was about 5.6% higher and OARs doses are also 5.2% higher compared to AXB. Conclusion: The results of this study showed that AXB dose calculation involving high-density materials is more accurate than AAA calculation, and AXB was superior to AAA in dose predictions beyond dark artifact/air cavity portion when compared against the measurements.

  12. SU-E-T-213: Initial Experience with VMAT Plan and Delivery Verification Using a DICOM-RT Framework and Linac Delivery Log Files

    SciTech Connect (OSTI)

    Reynolds, R; Pompos, A; Gu, X; Jiang, S; Stojadinovic, S

    2014-06-01

    Purpose: Mobius3D/MobiusFX (M3D/MFX), a commercial DICOM-RT based plan and delivery verification system, was used to compare calculated and delivered volumetric modulated arc therapy (VMAT) dose distributions using TrueBeam delivery log files (TrajectoryLogs). Methods: M3D/MFX utilizes measured linac commissioning data to generate institution specific beam models for evaluating planned and delivered dose distributions. 30 RapidArc prostate plans and 30 head and neck SmartArc plans were used in this study. For every plan, CT images, contoured structure sets, RT-plan, and RT-dose files were exported to M3D, which recalculated the patients’ planning CT dose distributions using a collapsed-cone-convolutionsuperposition algorithm. MFX utilized the acquired TrajectoryLogs to compute patients’ delivered dose distributions based on actual treatment delivery parameters. The agreement between computed and delivered dose distributions was evaluated utilizing a (3%, 3mm) global 3D-gamma analysis and dose-volume histogram changes for targets and organs at risk. Results: Excellent 3D-gamma agreements were observed for all VMAT plans. On average, for computed and delivered RapidArc and SmartArc plans the gamma passing rates were (99.0%±1.4%) and (96.8%±1.8%), respectively. The average difference for primary target prescription dose percent-coverage between calculated and delivered plans was (− 0.09%±2.52%) for RapidArc and (−2.71%±4.62%) for SmartArc cases. Similarly, the planning target mean dose differences were (1.38%±0.96%) for RapidArc and (1.17%±0.72%) for SmartArc plans. For the prostate plans, the calculated and delivered variations of the maximum dose for a 2cc volume for bladder and rectum were (1.32%±1.26%) and (0.65%±1.44%), respectively. The spinal-cord 2cc maximum dose differences of (3.26%±1.68%) were observed for the SmartArc plans. Conclusions: Clinical quality assurance practice based on linac treatment log files for verification of delivered 3D

  13. SU-E-T-105: Development of 3D Dose Verification System for Volumetric Modulated Arc Therapy Using Improved Polyacrylamide-Based Gel Dosimeter

    SciTech Connect (OSTI)

    Ono, K; Fujimoto, S; Akagi, Y; Hirokawa, Y; Hayashi, S; Miyazawa, M

    2014-06-01

    Purpose: The aim of this dosimetric study was to develop 3D dose verification system for volumetric modulated arc therapy (VMAT) using polyacrylamide-based gel (PAGAT) dosimeter improved the sensitivity by magnesium chloride (MgCl{sub 2}). Methods: PAGAT gel containing MgCl{sub 2} as a sensitizer was prepared in this study. Methacrylic-acid-based gel (MAGAT) was also prepared to compare the dosimetric characteristics with PAGAT gel. The cylindrical glass vials (4 cm diameter, 12 cm length) filled with each polymer gel were irradiated with 6 MV photon beam using Novalis Tx linear accelerator (Varian/BrainLAB). The irradiated polymer gel dosimeters were scanned with Signa 1.5 T MRI system (GE), and dose calibration curves were obtained using T{sub 2} relaxation rate (R{sub 2} = 1/T{sub 2}). Dose rate (100-600 MU min{sup ?1}) and fractionation (1-8 fractions) were varied. In addition, a cubic acrylic phantom (10 10 10 cm{sup 3}) filled with improved PAGAT gel inserted into the IMRT phantom (IBA) was irradiated with VMAT (RapidArc). C-shape structure was used for the VMAT planning by the Varian Eclipse treatment planning system (TPS). The dose comparison of TPS and measurements with the polymer gel dosimeter was accomplished by the gamma index analysis, overlaying the dose profiles for a set of data on selected planes using in-house developed software. Results: Dose rate and fractionation dependence of improved PAGAT gel were smaller than MAGAT gel. A high similarity was found by overlaying the dose profiles measured with improved PAGAT gel dosimeter and the TPS dose, and the mean pass rate of the gamma index analysis using 3%/3 mm criteria was achieved 90% on orthogonal planes for VMAT using improved PAGAT gel dosimeter. Conclusion: In-house developed 3D dose verification system using improved polyacrylamide-based gel dosimeter had a potential as an effective tool for VMAT QA.

  14. SU-E-J-146: A Research of PET-CT SUV Range for the Online Dose Verification in Carbon Ion Radiation Therapy

    SciTech Connect (OSTI)

    Sun, L; Hu, W; Moyers, M; Zhao, J; Hsi, W

    2015-06-15

    Purpose: Positron-emitting isotope distributions can be used for the image fusion of the carbon ion planning CT and online target verification PETCT, after radiation in the same decay period,the relationship between the same target volume and the SUV value of different every single fraction dose can be found,then the range of SUV for the radiation target could be decided.So this online range also can provide reference for the correlation and consistency in planning target dose verification and evaluation for the clinical trial. Methods: The Rando head phantom can be used as real body,the 10cc cube volume target contouring is done,beam ISO Center depth is 7.6cm and the 90 degree fixed carbon ion beams should be delivered in single fraction effective dose of 2.5GyE,5GyE and 8GyE.After irradiation,390 seconds later the 30 minutes PET-CT scanning is performed,parameters are set to 50Kg virtual weight,0.05mCi activity.MIM Maestro is used for the image processing and fusion,five 16mm diameter SUV spheres have been chosen in the different direction in the target.The average SUV in target for different fraction dose can be found by software. Results: For 10cc volume target,390 seconds decay period,the Single fraction effective dose equal to 2.5Gy,Ethe SUV mean value is 3.42,the relative range is 1.72 to 6.83;Equal to 5GyE,SUV mean value is 9.946,the relative range is 7.016 to 12.54;Equal or above to 8GyE,SUV mean value is 20.496,the relative range is 11.16 to 34.73. Conclusion: Making an evaluation for accuracy of the dose distribution using the SUV range which is from the planning CT with after treatment online PET-CT fusion for the normal single fraction carbon ion treatment is available.Even to the plan which single fraction dose is above 2GyE,in the condition of other parameters all the same,the SUV range is linearly dependent with single fraction dose,so this method also can be used in the hyper-fraction treatment plan.

  15. A Visual Analytics Approach to Structured Data Analysis to Enhance Nonproliferation and Arms Control Verification Activities

    SciTech Connect (OSTI)

    Gillen, David S.

    2014-08-07

    Analysis activities for Nonproliferation and Arms Control verification require the use of many types of data. Tabular structured data, such as Excel spreadsheets and relational databases, have traditionally been used for data mining activities, where specific queries are issued against data to look for matching results. The application of visual analytics tools to structured data enables further exploration of datasets to promote discovery of previously unknown results. This paper discusses the application of a specific visual analytics tool to datasets related to the field of Arms Control and Nonproliferation to promote the use of visual analytics more broadly in this domain. Visual analytics focuses on analytical reasoning facilitated by interactive visual interfaces (Wong and Thomas 2004). It promotes exploratory analysis of data, and complements data mining technologies where known patterns can be mined for. Also with a human in the loop, they can bring in domain knowledge and subject matter expertise. Visual analytics has not widely been applied to this domain. In this paper, we will focus on one type of data: structured data, and show the results of applying a specific visual analytics tool to answer questions in the Arms Control and Nonproliferation domain. We chose to use the T.Rex tool, a visual analytics tool developed at PNNL, which uses a variety of visual exploration patterns to discover relationships in structured datasets, including a facet view, graph view, matrix view, and timeline view. The facet view enables discovery of relationships between categorical information, such as countries and locations. The graph tool visualizes node-link relationship patterns, such as the flow of materials being shipped between parties. The matrix visualization shows highly correlated categories of information. The timeline view shows temporal patterns in data. In this paper, we will use T.Rex with two different datasets to demonstrate how interactive exploration of

  16. International training course on nuclear materials accountability for safeguards purposes

    SciTech Connect (OSTI)

    Not Available

    1980-12-01

    The two volumes of this report incorporate all lectures and presentations at the International Training Course on Nuclear Materials Accountability and Control for Safeguards Purposes, held May 27-June 6, 1980, at the Bishop's Lodge near Santa Fe, New Mexico. The course, authorized by the US Nuclear Non-Proliferation Act and sponsored by the US Department of Energy in cooperation with the International Atomic Energy Agency, was developed to provide practical training in the design, implementation, and operation of a National system of nuclear materials accountability and control that satisfies both National and IAEA International safeguards objectives. Volume I, covering the first week of the course, presents the background, requirements, and general features of material accounting and control in modern safeguard systems. Volume II, covering the second week of the course, provides more detailed information on measurement methods and instruments, practical experience at power reactor and research reactor facilities, and examples of operating state systems of accountability and control.

  17. Multi-purpose canister system evaluation: A systems engineering approach

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This report summarizes Department of Energy (DOE) efforts to investigate various container systems for handling, transporting, storing, and disposing of spent nuclear fuel (SNF) assemblies in the Civilian Radioactive Waste Management System (CRWMS). The primary goal of DOE`s investigations was to select a container technology that could handle the vast majority of commercial SNF at a reasonable cost, while ensuring the safety of the public and protecting the environment. Several alternative cask and canister concepts were evaluated for SNF assembly packaging to determine the most suitable concept. Of these alternatives, the multi-purpose canister (MPC) system was determined to be the most suitable. Based on the results of these evaluations, the decision was made to proceed with design and certification of the MPC system. A decision to fabricate and deploy MPCs will be made after further studies and preparation of an environmental impact statement.

  18. RELAP-7 Software Verification and Validation Plan: Requirements Traceability Matrix (RTM) Part 1 – Physics and numerical methods

    SciTech Connect (OSTI)

    Choi, Yong Joon; Yoo, Jun Soo; Smith, Curtis Lee

    2015-09-01

    This INL plan comprehensively describes the Requirements Traceability Matrix (RTM) on main physics and numerical method of the RELAP-7. The plan also describes the testing-based software verification and validation (SV&V) process—a set of specially designed software models used to test RELAP-7.

  19. Interim Letter Report - Verification Survey of 19 Grids in the Lester Flat Area, David Witherspoon Inc. 1630 Site Knoxville, Tennessee

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-10-17

    Perform verification surveys of 19 available grids located in the Lester Flat Area at the Davod Witherspoon Site. The survey grids included E11, E12, E13, F11, F12, F13, F14, F15, G15, G16, G17, H16, H17, H18, X16, X17, X18, K16, and J16.

  20. Verification and implications of the multiple pin treatment in the SASSYS-1 LMR systems analysis code

    SciTech Connect (OSTI)

    Dunn, F.E.

    1994-03-01

    As part of a program to obtain realistic, as opposed to excessively conservative, analysis of reactor transients, a multiple pin treatment for the analysis of intra-subassembly thermal hydraulics has been included in the SASSYS-1 liquid metal reactor systems analysis code. This new treatment has made possible a whole new level of verification for the code. The code can now predict the steady-state and transient responses of individual thermocouples within instrumented subassemlies in a reactor, rather than just predicting average temperatures for a subassembly. Very good agreement has been achieved between code predictions and the experimental measurements of steady-state and transient temperatures and flow rates in the Shutdown Heat Removal Tests in the EBR-II Reactor. Detailed multiple pin calculations for blanket subassemblies in the EBR-II reactor demonstrate that the actual steady-state and transient peak temperatures in these subassemblies are significantly lower than those that would be calculated by simpler models.

  1. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect (OSTI)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  2. Vibratory response modeling and verification of a high precision optical positioning system.

    SciTech Connect (OSTI)

    Barraza, J.; Kuzay, T.; Royston, T. J.; Shu, D.

    1999-06-18

    A generic vibratory-response modeling program has been developed as a tool for designing high-precision optical positioning systems. Based on multibody dynamics theory, the system is modeled as rigid-body structures connected by linear elastic elements, such as complex actuators and bearings. The full dynamic properties of each element are determined experimentally or theoretically, then integrated into the program as inertial and stiffness matrices. Utilizing this program, the theoretical and experimental verification of the vibratory behavior of a double-multilayer monochromator support and positioning system is presented. Results of parametric design studies that investigate the influence of support floor dynamics and highlight important design issues are also presented. Overall, good matches between theory and experiment demonstrate the effectiveness of the program as a dynamic modeling tool.

  3. Initial verification and validation of RAZORBACK - A research reactor transient analysis code

    SciTech Connect (OSTI)

    Talley, Darren G.

    2015-09-01

    This report describes the work and results of the initial verification and validation (V&V) of the beta release of the Razorback code. Razorback is a computer code designed to simulate the operation of a research reactor (such as the Annular Core Research Reactor (ACRR)) by a coupled numerical solution of the point reactor kinetics equations, the energy conservation equation for fuel element heat transfer, and the mass, momentum, and energy conservation equations for the water cooling of the fuel elements. This initial V&V effort was intended to confirm that the code work to-date shows good agreement between simulation and actual ACRR operations, indicating that the subsequent V&V effort for the official release of the code will be successful.

  4. Environmental technology verification report: Soil sampler. Clements Associates, Inc. JMC environmentalist`s subsoil probe

    SciTech Connect (OSTI)

    1998-08-01

    The EPA`s National Exposure Research Laboratory, which demonstrates field characterization and monitoring technologies, selected Tetra Tech EM Inc. as the verification organization to assist in field testing. This document summarizes the results of a demonstration of the ESP{reg_sign}. In 1997 EPA conducted a field test of the ESP{reg_sign} sampler. The performance of this system was compared to a reference subsurface soil sampling method (hollow-stem auger drilling and split-spoon sampling) in terms of the following parameters: sample recovery, VOC concentrations in recovered samples, sample integrity, reliability and throughput, and cost. Data quality indicators for precision, accuracy, representativeness, completeness and comparability were also assessed against project-specific QA objectives to ensure usefulness of the data. A complete description of the demonstration, including a data summary and discussion of results is available in this report.

  5. Wide-Field Lensing Mass Maps from DES Science Verification Data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Chang, C.; Vikram, V.; Jain, B.

    2015-07-29

    We present a mass map reconstructed from weak gravitational lensing shear measurements over 139 deg2 from the Dark Energy Survey (DES) Science Verification data. The mass map probes both luminous and dark matter, thus providing a tool for studying cosmology. We find good agreement between the mass map and the distribution of massive galaxy clusters identified using a red-sequence cluster finder. Potential candidates for super-clusters and voids are identified using these maps. We measure the cross-correlation between the mass map and a magnitude-limited foreground galaxy sample and find a detection at the 6.8? level with 20 arcminute smoothing. These measurementsmoreare consistent with simulated galaxy catalogs based on ?CDM Nbody simulations, suggesting low systematics uncertainties in the map. We summarize our key findings in this letter; the detailed methodology and tests for systematics are presented in a companion paper.less

  6. Speaker verification system using acoustic data and non-acoustic data

    DOE Patents [OSTI]

    Gable, Todd J.; Ng, Lawrence C.; Holzrichter, John F.; Burnett, Greg C.

    2006-03-21

    A method and system for speech characterization. One embodiment includes a method for speaker verification which includes collecting data from a speaker, wherein the data comprises acoustic data and non-acoustic data. The data is used to generate a template that includes a first set of "template" parameters. The method further includes receiving a real-time identity claim from a claimant, and using acoustic data and non-acoustic data from the identity claim to generate a second set of parameters. The method further includes comparing the first set of parameters to the set of parameters to determine whether the claimant is the speaker. The first set of parameters and the second set of parameters include at least one purely non-acoustic parameter, including a non-acoustic glottal shape parameter derived from averaging multiple glottal cycle waveforms.

  7. Guide to verification and validation of the SCALE-4 criticality safety software

    SciTech Connect (OSTI)

    Emmett, M.B.; Jordan, W.C.

    1996-12-01

    Whenever a decision is made to newly install the SCALE nuclear criticality safety software on a computer system, the user should run a set of verification and validation (V&V) test cases to demonstrate that the software is properly installed and functioning correctly. This report is intended to serve as a guide for this V&V in that it specifies test cases to run and gives expected results. The report describes the V&V that has been performed for the nuclear criticality safety software in a version of SCALE-4. The verification problems specified by the code developers have been run, and the results compare favorably with those in the SCALE 4.2 baseline. The results reported in this document are from the SCALE 4.2P version which was run on an IBM RS/6000 workstation. These results verify that the SCALE-4 nuclear criticality safety software has been correctly installed and is functioning properly. A validation has been performed for KENO V.a utilizing the CSAS25 criticality sequence and the SCALE 27-group cross-section library for {sup 233}U, {sup 235}U, and {sup 239}Pu fissile, systems in a broad range of geometries and fissile fuel forms. The experimental models used for the validation were taken from three previous validations of KENO V.a. A statistical analysis of the calculated results was used to determine the average calculational bias and a subcritical k{sub eff} criteria for each class of systems validated. Included the statistical analysis is a means of estimating the margin of subcriticality in k{sub eff}. This validation demonstrates that KENO V.a and the 27-group library may be used for nuclear criticality safety computations provided the system being analyzed falls within the range of the experiments used in the validation.

  8. Mass and galaxy distributions of four massive galaxy clusters from Dark Energy Survey Science Verification data

    SciTech Connect (OSTI)

    Melchior, P.; et al.

    2015-05-21

    We measure the weak-lensing masses and galaxy distributions of four massive galaxy clusters observed during the Science Verification phase of the Dark Energy Survey. This pathfinder study is meant to 1) validate the DECam imager for the task of measuring weak-lensing shapes, and 2) utilize DECam's large field of view to map out the clusters and their environments over 90 arcmin. We conduct a series of rigorous tests on astrometry, photometry, image quality, PSF modeling, and shear measurement accuracy to single out flaws in the data and also to identify the optimal data processing steps and parameters. We find Science Verification data from DECam to be suitable for the lensing analysis described in this paper. The PSF is generally well-behaved, but the modeling is rendered difficult by a flux-dependent PSF width and ellipticity. We employ photometric redshifts to distinguish between foreground and background galaxies, and a red-sequence cluster finder to provide cluster richness estimates and cluster-galaxy distributions. By fitting NFW profiles to the clusters in this study, we determine weak-lensing masses that are in agreement with previous work. For Abell 3261, we provide the first estimates of redshift, weak-lensing mass, and richness. In addition, the cluster-galaxy distributions indicate the presence of filamentary structures attached to 1E 0657-56 and RXC J2248.7-4431, stretching out as far as 1 degree (approximately 20 Mpc), showcasing the potential of DECam and DES for detailed studies of degree-scale features on the sky.

  9. Fast radiographic film calibration procedure for helical tomotherapy intensity modulated radiation therapy dose verification

    SciTech Connect (OSTI)

    Yan Yulong; Papanikolaou, Nikos; Weng Xuejun; Penagaricano, Jose; Ratanatharathorn, Vaneerat

    2005-06-15

    Film dosimetry offers an advantageous in-phantom planar dose verification tool in terms of spatial resolution and ease of handling for quality assurance (QA) of intensity modulated radiation therapy (IMRT) plans. A critical step in the success of such a technique is that the film calibration be appropriately conducted. This paper presents a fast and efficient film calibration method for a helical tomotherapy unit using a single sheet of film. Considering the unique un-flattened cone shaped profile from a helical tomotherapy beam, a custom leaf control file (sinogram) was created, to produce a valley shaped intensity pattern. There are eleven intensity steps in the valley pattern, representing varying dose values from 38 to 265 cGy. This dose range covers the most commonly prescribed doses in fractionated IMRT treatments. An ion chamber in a solid water phantom was used to measure the dose in each of the eleven steps. For daily film calibration the whole procedure, including film exposure, processing, digitization and analysis, can be completed within 15 min, making it practical to use this technique routinely. This method is applicable to film calibration on a helical tomotherapy unit and is particularly useful in IMRT planar dose verification due to its efficiency and reproducibility. In this work, we characterized the dose response of the KODAK EDR2 ready-pack film which was used to develop the step valley dose maps and the IMRT QA planar doses. A comparison between the step valley technique and multifilm based calibration showed that both calibration methods agreed with less than 0.4% deviation in the clinically useful dose ranges.

  10. Mass and galaxy distributions of four massive galaxy clusters from Dark Energy Survey Science Verification data

    SciTech Connect (OSTI)

    Melchior, P.; Suchyta, E.; Huff, E.; Hirsch, M.; Kacprzak, T.; Rykoff, E.; Gruen, D.; Armstrong, R.; Bacon, D.; Bechtol, K.; Bernstein, G. M.; Bridle, S.; Clampitt, J.; Honscheid, K.; Jain, B.; Jouvel, S.; Krause, E.; Lin, H.; MacCrann, N.; Patton, K.; Plazas, A.; Rowe, B.; Vikram, V.; Wilcox, H.; Young, J.; Zuntz, J.; Abbott, T.; Abdalla, F. B.; Allam, S. S.; Banerji, M.; Bernstein, J. P.; Bernstein, R. A.; Bertin, E.; Buckley-Geer, E.; Burke, D. L.; Castander, F. J.; da Costa, L. N.; Cunha, C. E.; Depoy, D. L.; Desai, S.; Diehl, H. T.; Doel, P.; Estrada, J.; Evrard, A. E.; Neto, A. F.; Fernandez, E.; Finley, D. A.; Flaugher, B.; Frieman, J. A.; Gaztanaga, E.; Gerdes, D.; Gruendl, R. A.; Gutierrez, G. R.; Jarvis, M.; Karliner, I.; Kent, S.; Kuehn, K.; Kuropatkin, N.; Lahav, O.; Maia, M. A. G.; Makler, M.; Marriner, J.; Marshall, J. L.; Merritt, K. W.; Miller, C. J.; Miquel, R.; Mohr, J.; Neilsen, E.; Nichol, R. C.; Nord, B. D.; Reil, K.; Roe, N. A.; Roodman, A.; Sako, M.; Sanchez, E.; Santiago, B. X.; Schindler, R.; Schubnell, M.; Sevilla-Noarbe, I.; Sheldon, E.; Smith, C.; Soares-Santos, M.; Swanson, M. E. C.; Sypniewski, A. J.; Tarle, G.; Thaler, J.; Thomas, D.; Tucker, D. L.; Walker, A.; Wechsler, R.; Weller, J.; Wester, W.

    2015-03-31

    We measure the weak-lensing masses and galaxy distributions of four massive galaxy clusters observed during the Science Verification phase of the Dark Energy Survey. This pathfinder study is meant to 1) validate the DECam imager for the task of measuring weak-lensing shapes, and 2) utilize DECam's large field of view to map out the clusters and their environments over 90 arcmin. We conduct a series of rigorous tests on astrometry, photometry, image quality, PSF modelling, and shear measurement accuracy to single out flaws in the data and also to identify the optimal data processing steps and parameters. We find Science Verification data from DECam to be suitable for the lensing analysis described in this paper. The PSF is generally well-behaved, but the modelling is rendered difficult by a flux-dependent PSF width and ellipticity. We employ photometric redshifts to distinguish between foreground and background galaxies, and a red-sequence cluster finder to provide cluster richness estimates and cluster-galaxy distributions. By fitting NFW profiles to the clusters in this study, we determine weak-lensing masses that are in agreement with previous work. For Abell 3261, we provide the first estimates of redshift, weak-lensing mass, and richness. Additionally, the cluster-galaxy distributions indicate the presence of filamentary structures attached to 1E 0657-56 and RXC J2248.7-4431, stretching out as far as 1degree (approximately 20 Mpc), showcasing the potential of DECam and DES for detailed studies of degree-scale features on the sky.

  11. Mass and galaxy distributions of four massive galaxy clusters from Dark Energy Survey Science Verification data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Melchior, P.; Suchyta, E.; Huff, E.; Hirsch, M.; Kacprzak, T.; Rykoff, E.; Gruen, D.; Armstrong, R.; Bacon, D.; Bechtol, K.; et al

    2015-03-31

    We measure the weak-lensing masses and galaxy distributions of four massive galaxy clusters observed during the Science Verification phase of the Dark Energy Survey. This pathfinder study is meant to 1) validate the DECam imager for the task of measuring weak-lensing shapes, and 2) utilize DECam's large field of view to map out the clusters and their environments over 90 arcmin. We conduct a series of rigorous tests on astrometry, photometry, image quality, PSF modelling, and shear measurement accuracy to single out flaws in the data and also to identify the optimal data processing steps and parameters. We find Sciencemore » Verification data from DECam to be suitable for the lensing analysis described in this paper. The PSF is generally well-behaved, but the modelling is rendered difficult by a flux-dependent PSF width and ellipticity. We employ photometric redshifts to distinguish between foreground and background galaxies, and a red-sequence cluster finder to provide cluster richness estimates and cluster-galaxy distributions. By fitting NFW profiles to the clusters in this study, we determine weak-lensing masses that are in agreement with previous work. For Abell 3261, we provide the first estimates of redshift, weak-lensing mass, and richness. Additionally, the cluster-galaxy distributions indicate the presence of filamentary structures attached to 1E 0657-56 and RXC J2248.7-4431, stretching out as far as 1degree (approximately 20 Mpc), showcasing the potential of DECam and DES for detailed studies of degree-scale features on the sky.« less

  12. In-Field Performance Testing of the Fork Detector for Quantitative Spent Fuel Verification

    SciTech Connect (OSTI)

    Gauld, Ian C.; Hu, Jianwei; De Baere, P.; Vaccaro, S.; Schwalbach, P.; Liljenfeldt, Henrik; Tobin, Stephen

    2015-01-01

    Expanding spent fuel dry storage activities worldwide are increasing demands on safeguards authorities that perform inspections. The European Atomic Energy Community (EURATOM) and the International Atomic Energy Agency (IAEA) require measurements to verify declarations when spent fuel is transferred to difficult-to-access locations, such as dry storage casks and the repositories planned in Finland and Sweden. EURATOM makes routine use of the Fork detector to obtain gross gamma and total neutron measurements during spent fuel inspections. Data analysis is performed by modules in the integrated Review and Analysis Program (iRAP) software, developed jointly by EURATOM and the IAEA. Under the framework of the US Department of Energy–EURATOM cooperation agreement, a module for automated Fork detector data analysis has been developed by Oak Ridge National Laboratory (ORNL) using the ORIGEN code from the SCALE code system and implemented in iRAP. EURATOM and ORNL recently performed measurements on 30 spent fuel assemblies at the Swedish Central Interim Storage Facility for Spent Nuclear Fuel (Clab), operated by the Swedish Nuclear Fuel and Waste Management Company (SKB). The measured assemblies represent a broad range of fuel characteristics. Neutron count rates for 15 measured pressurized water reactor assemblies are predicted with an average relative standard deviation of 4.6%, and gamma signals are predicted on average within 2.6% of the measurement. The 15 measured boiling water reactor assemblies exhibit slightly larger deviations of 5.2% for the gamma signals and 5.7% for the neutron count rates, compared to measurements. These findings suggest that with improved analysis of the measurement data, existing instruments can provide increased verification of operator declarations of the spent fuel and thereby also provide greater ability to confirm integrity of an assembly. These results support the application of the Fork detector as a fully quantitative spent fuel

  13. verification & Validation of High-Order Short-Characteristics-Based Deterministic Transport Methodology on Unstructured Grids

    SciTech Connect (OSTI)

    Azmy, Yousry; Wang, Yaqi

    2013-12-20

    The research team has developed a practical, high-order, discrete-ordinates, short characteristics neutron transport code for three-dimensional configurations represented on unstructured tetrahedral grids that can be used for realistic reactor physics applications at both the assembly and core levels. This project will perform a comprehensive verification and validation of this new computational tool against both a continuous-energy Monte Carlo simulation (e.g. MCNP) and experimentally measured data, an essential prerequisite for its deployment in reactor core modeling. Verification is divided into three phases. The team will first conduct spatial mesh and expansion order refinement studies to monitor convergence of the numerical solution to reference solutions. This is quantified by convergence rates that are based on integral error norms computed from the cell-by-cell difference between the codes numerical solution and its reference counterpart. The latter is either analytic or very fine- mesh numerical solutions from independent computational tools. For the second phase, the team will create a suite of code-independent benchmark configurations to enable testing the theoretical order of accuracy of any particular discretization of the discrete ordinates approximation of the transport equation. For each tested case (i.e. mesh and spatial approximation order), researchers will execute the code and compare the resulting numerical solution to the exact solution on a per cell basis to determine the distribution of the numerical error. The final activity comprises a comparison to continuous-energy Monte Carlo solutions for zero-power critical configuration measurements at Idaho National Laboratorys Advanced Test Reactor (ATR). Results of this comparison will allow the investigators to distinguish between modeling errors and the above- listed discretization errors introduced by the deterministic method, and to separate the sources of uncertainty.

  14. General-purpose event generators for LHC physics

    SciTech Connect (OSTI)

    Buckley, Andy; Butterworth, Jonathan; Gieseke, Stefan; Grellscheid, David; Hoche, Stefan; Hoeth, Hendrik; Krauss, Frank; Lonnblad, Leif; Nurse, Emily; Richardson, Peter; Schumann, Steffen; Seymour, Michael H.; Sjostrand, Torbjorn; Skands, Peter; Webber, Bryan; /Cambridge U.

    2011-03-03

    We review the physics basis, main features and use of general-purpose Monte Carlo event generators for the simulation of proton-proton collisions at the Large Hadron Collider. Topics included are: the generation of hard-scattering matrix elements for processes of interest, at both leading and next-to-leading QCD perturbative order; their matching to approximate treatments of higher orders based on the showering approximation; the parton and dipole shower formulations; parton distribution functions for event generators; non-perturbative aspects such as soft QCD collisions, the underlying event and diffractive processes; the string and cluster models for hadron formation; the treatment of hadron and tau decays; the inclusion of QED radiation and beyond-Standard-Model processes. We describe the principal features of the Ariadne, Herwig++, Pythia 8 and Sherpa generators, together with the Rivet and Professor validation and tuning tools, and discuss the physics philosophy behind the proper use of these generators and tools. This review is aimed at phenomenologists wishing to understand better how parton-level predictions are translated into hadron-level events as well as experimentalists wanting a deeper insight into the tools available for signal and background simulation at the LHC.

  15. Multi-purpose hydrogen isotopes separation plant design

    SciTech Connect (OSTI)

    Boniface, H.A.; Gnanapragasam, N.V.; Ryland, D.K.; Suppiah, S.; Castillo, I.

    2015-03-15

    There is a potential interest at AECL's Chalk River Laboratories to remove tritium from moderately tritiated light water and to reclaim tritiated, downgraded heavy water. With only a few limitations, a single CECE (Combined Electrolysis and Catalytic Exchange) process configuration can be designed to remove tritium from heavy water or light water and upgrade heavy water. Such a design would have some restrictions on the nature of the feed-stock and tritium product, but could produce essentially tritium-free light or heavy water that is chemically pure. The extracted tritium is produced as a small quantity of tritiated heavy water. The overall plant capacity is fixed by the total amount of electrolysis and volume of catalyst. In this proposal, with 60 kA of electrolysis a throughput of 15 kg*h{sup -1} light water for detritiation, about 4 kg*h{sup -1} of heavy water for detritiation and about 27 kg*h{sup -1} of 98% heavy water for upgrading can be processed. Such a plant requires about 1,000 liters of AECL isotope exchange catalyst. The general design features and details of this multi-purpose CECE process are described in this paper, based on some practical choices of design criteria. In addition, we outline the small differences that must be accommodated and some compromises that must be made to make the plant capable of such flexible operation. (authors)

  16. RAPID/Best Practices/Purpose and Need | Open Energy Information

    Open Energy Info (EERE)

    and will represent the project. For the NEPA lead agency, the purpose may be different. Agency's Purpose and Need Statement Federal agencies conducting environmental...

  17. Purpose and Need: CEQ Exchange of Letters with Secretary of Transporta...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purpose and Need: CEQ Exchange of Letters with Secretary of Transportation Purpose and Need: CEQ Exchange of Letters with Secretary of Transportation A discussion between the ...

  18. Verification survey report of the south waste tank farm training/test tower and hazardous waste storage lockers at the West Valley demonstration project, West Valley, New York

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-08-29

    A team from ORAU's Independent Environmental Assessment and Verification Program performed verification survey activities on the South Test Tower and four Hazardous Waste Storage Lockers. Scan data collected by ORAU determined that both the alpha and alpha-plus-beta activity was representative of radiological background conditions. The count rate distribution showed no outliers that would be indicative of alpha or alpha-plus-beta count rates in excess of background. It is the opinion of ORAU that independent verification data collected support the site?s conclusions that the South Tower and Lockers sufficiently meet the site criteria for release to recycle and reuse.

  19. Letter Report - Verification Results for the Non-Real Property Radiological Release Program at the West Valley Demonstration Project, Ashford, New York

    SciTech Connect (OSTI)

    M.A. Buchholz

    2009-04-29

    The objective of the verification activities is to provide an independent review of the design, implementation, and performance of the radiological unrestricted release program for personal property, materials, and equipment (non-real property).

  20. TYPE A VERIFICATION REPORT FOR THE HIGH FLUX BEAM REACTOR STACK AND GROUNDS, BROOKHAVEN NATIONAL LABORATORY, UPTON, NEW YORK DCN 5098-SR-08-0

    SciTech Connect (OSTI)

    Evan Harpenau

    2011-11-30

    The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA).