Powered by Deep Web Technologies
Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Site: Contract Name: Contractor: Contract Number: Contract Type...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Name: Contractor: Contract Number: Contract Type: Total Estimated Contract Cost: Contract Period: Minimum Fee Maximum Fee Performance Period Fee Available Total Fee Paid...

2

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number: Contract Type: Total Estimated Contract Cost: Performance Period Total Fee Earned FY2008 2,550,203 FY2009 39,646,446 FY2010 64,874,187 FY2011 66,253,207 FY2012...

3

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number: Number: Contract Type: Total Estimated Contract Cost: Performance Period Total Fee Earned FY2008 $2,550,203 FY2009 $39,646,446 FY2010 $64,874,187 FY2011 $66,253,207 FY2012 $41,492,503 FY2013 $0 FY2014 FY2015 FY2016 FY2017 FY2018 Cumulative Fee Earned $214,816,546 Fee Available $2,550,203 Minimum Fee $77,931,569 $69,660,249 Savannah River Nuclear Solutions LLC $458,687,779 $0 Maximum Fee Fee Information $88,851,963 EM Contractor Fee Site: Savannah River Site Office, Aiken, SC Contract Name: Management & Operating Contract September 2013 DE-AC09-08SR22470

4

Company/Product Description Contract Number Contract Holders  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company/Product Company/Product Description Contract Number Contract Holders (contact directly) Small Business Product POCs DOE POC Adobe Adobe's Government Cumulative Licenses Program (CLP) and Enterprise Agreement (EA2) Program. Most Adobe desktop products and services DE-IM0000595 Emergent, LLC: Tenley White ph: 571-419-6430 twhite@emergent360.com Matthew Frazee ph: 571-419-6419 MFrazee@emergent360.com YES Adobe: Tiffany Person ph: 847-224-2746 tiperson@adobe.com Alan Andon Alan.Andon@hq.doe.gov 301-903-9722 AT&T email Cybersecurity Services (DEX) DE-IM0000695 AT&T: Linda D. Blanchard ph: 443-896-5291 lb4826@att.com NO AT&T PM: Linda D. Blanchard ph: 443-896-5291 lb4826@att.com DOE PM: Brian Varine ph: : 202-586-8139 Brian.varine@hq.doe.gov Core Security

5

INTERVIEWER:  

U.S. Energy Information Administration (EIA) Indexed Site

INTERVIEWER: INTERVIEWER: 1990 PLEASE CALL DIRECTORY ASSISTANCE TO GET THE TELEPHONE NUMBER FOR THE HOUSEHOLD LISTED ON THE ADDRESS LABEL R90E-06 120790 a Telephone f ) - D Telephone number is UNLISTED a NO telephone NUMBER listed for this name at this address D OTHER: Please describe result below: 1991 RTECS Operations Manual/Appendix A-1 Department of Energy Washington, DC 20585 January 1991 Dear Resident: The U.S. Department of Energy (DOE) Is committed to developing a comprehensive National Energy Strategy. One of the ways DOE is attempting to do this is by learning about your vehicles' energy use. But, your help is needed. An interviewer will telephone you shortly to ask questions about your motor vehicles. The interviewer is employed by the Response Analysis Corporation of Princeton, New Jersey, who is under

6

STATE OF UTAH CONTRACT NUMBER: AR2051 13 pages Contract last updated on 1/3/2013  

E-Print Network (OSTI)

/31/2014. PLEASE NOTE UPDATED PRICE SHEETS. STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED NUMBER: AR2051 13 pages Contract last updated on 1/3/2013 STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED. 1. All State Agencies are required to compare a minimum of three digital copier

Capecchi, Mario R.

7

STATE OF UTAH CONTRACT NUMBER: AR2059 10 PAGES Contract last updated on 1/18/2011  

E-Print Network (OSTI)

: PLEASE NOTE NEW CONTACT PERSON. STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED NUMBER: AR2059 10 PAGES Contract last updated on 1/18/2011 STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED. 1. All State Agencies are required to compare a minimum of three

Capecchi, Mario R.

8

STATE OF UTAH CONTRACT NUMBER: AR2058 15 PAGES Contract last updated on 11/30/2010  

E-Print Network (OSTI)

and eStudio 237 have been replaced by the eStudio 182 and eStudio 242. STATE AGENCIES TO USE NUMBER: AR2058 15 PAGES Contract last updated on 11/30/2010 STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED. 1. All State Agencies are required to compare

Capecchi, Mario R.

9

Quarterly Management Report WBS Element Project Title Contract Number  

E-Print Network (OSTI)

Since the last report, cast alloys based on weld overlay compositions were selected for long-term are in wt%) will be isothermally tested at 500C for exposures up to 2000 hours. Several long-term corrosion Contract End Performer Name and Address Principal Investigator(s) BUDGET AND COST REPORT Prior Year Funds

10

Name of Contractor: ActioNet, Inc. Contract Number: DE-DT0003143  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal and Eligible Contractor Use (Contractors must obtain written Federal and Eligible Contractor Use (Contractors must obtain written approval from the DOE Contracting Officer) Name of Contractor: ActioNet, Inc. Contract Number: DE-DT0003143 Expiration Date: 04/12/2014 Brief description of the products or services available: Information Technology Support Services Type of Business: Small Business Extent of Competition: Competed within Alliant Small Business GWAC Contract Specialist: Arness Harris Telephone Number: (202) 287-1601 E-Mail Address: arness.harris@hg.doe.gov For ordering information contact: OCIO COR: Tim Beckham COR Telephone Number: (301) 903-3187 Name of Contractor: DLT Solutions, Inc. Contract Number: DE-AB01-071M00180 Expiration Date: 03/20/2013 Brief description of the products or services available: Red Hat Proprietary Computer Software

11

STATE OF UTAH CONTRACT NUMBER: AR2055 16 PAGES Contract last updated on 1/3/2013  

E-Print Network (OSTI)

/31/2014. STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED. POLITICAL SUBDIVISIONS, HIGHER ED Contract last updated on 1/3/2013 STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED. 1. All State Agencies are required to compare a minimum of three digital copier contracts

Capecchi, Mario R.

12

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87  

SciTech Connect

Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

NONE

1997-10-01T23:59:59.000Z

13

STATE OF UTAH CONTRACT NUMBER: AR2053 15 pages Contract last updated on 7/1/2010  

E-Print Network (OSTI)

. STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED. POLITICAL SUBDIVISIONS, HIGHER ED last updated on 7/1/2010 STATE AGENCIES TO USE THIS CONTRACT PREAUTHORIZATION IS REQUIRED. 1. All State Agencies are required to compare a minimum of three digital copier contracts and then make

Capecchi, Mario R.

14

DOE Contract Number DE-AC05-060R231  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE DOE Contract Number DE-AC05-060R231 00 Modification M045 Oak Ridge Associated Universities Page 2 of2 14. Description of AmendmenVModification: The purpose of this modification is to accomplish the following: 1) Advise you of changes in 10 CFR 707 which is invoked by DEAR 970.5223-4: 1) the definition of Testing Designated Positions (TOPs) now includes all contractor personnel with security clearances; 2) the percent of personnel to be randomly tested on an annual basis has been decreased from 50% to 30%, and 3) a Workplace Substance Abuse Program plan or revision should be submitted within 30 days from receipt of this notice. See DEAR 970.5223-4 Workplace Substance Abuse Programs at DOE Sites clause and FAR 52.243-2 Changes clause of this contract. Applicants for TOPs are also subject to drug testing. 2) Add the following clause to Section H of the contract: H.38 CLARIFICATION FOR

15

Options in the Eleventh Year for Interim Standard Offer Number Four Contracts  

SciTech Connect

The Interim Standard Offer Number Four Contracts (ISM), under which most of the geothermal industry is selling power (outside of The Geysers), has an initial ten year period of known fixed energy payments. In the eleventh year, the price goes to the Avoided Cost of the buying utility. The specific contract language is ''Seller will be paid at a rate equal to the utilities' published avoided cost of energy as updated and authorized by the Commission (CPUC)''. The first geothermal contract will reach the end of the initial 10 year period in early 1994, a few will end in 1995 and 1996, and the majority will end in the 1997-2000 period. This is beginning to be focused upon by the utilities, lenders and, of course, the operators themselves. The prime reason for focusing on the issue is that avoided costs of the utilities directly track the delivered cost of the natural gas, and most forecasts are showing that the price of gas in the eleventh year of the contracts will be significantly lower than the last year of the fixed period of energy payments. There are many forums in which the predication of natural gas prices are discussed. In the State of California, the agency responsible for the official forecast is the California Energy Commission. Every two years, the CEC holds hearings for input into its biennial Fuels Report (FR) which establishes the forecast of natural gas prices in addition to other parameters which are used in the planning process. The attached Exhibit I is an excerpt out of the 1991 Fuels Report (FR91). Figure 1 compares the forecast of FR89 and FR91 for the Utility Electric Generation (UEG) in PG&E's service area, and Figure 2, the forecast in the SOCAL service area. The FR91 SOCAL service area forecast indicates a bottoming of the gas price in 1994 at $2.50/mmbtu. Recent prices in 1992 are already at these levels. Converting this to an avoided energy cost brings about a price of 2 to 2-1/2 Cents/kWh. The 1992 energy price in the IS04 contract is 9.3 Cents/kWh.

Hinrichs, Thomas C.

1992-03-24T23:59:59.000Z

16

Options in the Eleventh Year for Interim Standard Offer Number Four Contracts  

DOE Green Energy (OSTI)

The Interim Standard Offer Number Four Contracts (ISM), under which most of the geothermal industry is selling power (outside of The Geysers), has an initial ten year period of known fixed energy payments. In the eleventh year, the price goes to the Avoided Cost of the buying utility. The specific contract language is ''Seller will be paid at a rate equal to the utilities' published avoided cost of energy as updated and authorized by the Commission (CPUC)''. The first geothermal contract will reach the end of the initial 10 year period in early 1994, a few will end in 1995 and 1996, and the majority will end in the 1997-2000 period. This is beginning to be focused upon by the utilities, lenders and, of course, the operators themselves. The prime reason for focusing on the issue is that avoided costs of the utilities directly track the delivered cost of the natural gas, and most forecasts are showing that the price of gas in the eleventh year of the contracts will be significantly lower than the last year of the fixed period of energy payments. There are many forums in which the predication of natural gas prices are discussed. In the State of California, the agency responsible for the official forecast is the California Energy Commission. Every two years, the CEC holds hearings for input into its biennial Fuels Report (FR) which establishes the forecast of natural gas prices in addition to other parameters which are used in the planning process. The attached Exhibit I is an excerpt out of the 1991 Fuels Report (FR91). Figure 1 compares the forecast of FR89 and FR91 for the Utility Electric Generation (UEG) in PG&E's service area, and Figure 2, the forecast in the SOCAL service area. The FR91 SOCAL service area forecast indicates a bottoming of the gas price in 1994 at $2.50/mmbtu. Recent prices in 1992 are already at these levels. Converting this to an avoided energy cost brings about a price of 2 to 2-1/2 Cents/kWh. The 1992 energy price in the IS04 contract is 9.3 Cents/kWh.

Hinrichs, Thomas C.

1992-03-24T23:59:59.000Z

17

Contract Number: DE-AC05-76RL01830 Modification M881  

E-Print Network (OSTI)

that in consideration of the extension of Contract No. DE- AC05-76RL01830 (hereinafter referred to as "the PNNL Prime, Appendix H of the PNNL Prime Contract (hereinafter referred to as "the Facilities") and the right of the Facilities shall include any use authorized under the PNNL Prime Contract, or as otherwise agreed

18

Contract Number: DE-AC05-76RL01830 Modification M881  

E-Print Network (OSTI)

, if not otherwise unallowable under any other term of the Contract, so long as: a. The property remains functional Prime Contract, if not otherwise unallowable under any other term of the Contract, so long as: a and Other Attachments Section J Appendix K Advance Agreement on Costs and Disposition of Battelle Owned

19

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995  

Science Conference Proceedings (OSTI)

Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

NONE

1996-08-01T23:59:59.000Z

20

MLM-462 Contract Number AT-33-l-GtiN-53 MOUND LABORATCRY Operatsd By  

Office of Legacy Management (LM)

This Doeumr;t Consists of 116 ?zges This Doeumr;t Consists of 116 ?zges This is COPY of i.3 k MLM-462 Contract Number AT-33-l-GtiN-53 MOUND LABORATCRY Operatsd By MONSAmOC~ALGoMPANY MIAMISBURG, OHIO REPORT NO. 3 OF STIEUING CaW'M'B FOR DISPUSAL CF UNITS 111 AND IV (Completion Report for Disposal of UrLt IV, Runnymeade Road sr,d Dixon live. Dayton, Ohlo) . Date: April 17, 1950 Prepared By: -36L254- F. L. Halbach Chairnan., St33ricg Gcicmittes 1ssue.d: DISTRIHJTION copy 1. - Dr. Carroll A. Hochwalt copy 2. - Dr. M. M. Haring copy 3. - Dr. J. J. Ehmbage COPY 4. - Mr. F. L. Halbach . - Copy 5. - 5 '3 . . ., I Copy 6. - Area Ahmger COPY 7. - Area Y@mger CWY 8. - Area Qinagsr copy 9. - Area Ydager CT -Files&?& d3i' V.-u c 4. copy 11. - Central Files i copy 12. - Central Files

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Prime Contract Number DE-AC36-98GO10337 Section I Part 2  

NLE Websites -- All DOE Office Websites (Extended Search)

970.5204-31 INSURANCE--LITIGATION AND CLAIMS (JUN 1997) (a) The Contractor may, with the prior written authorization of the contracting officer, and shall, upon the request of the...

22

Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996  

SciTech Connect

Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

NONE

1997-05-01T23:59:59.000Z

23

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04 294,316 FY2005 820,074 FY2006 799,449 FY2007 877,898 FY2008 866,608 FY2009 886,404 FY2010 800,314 FY2011 871,280 FY2012 824,517 FY2013 Cumulative Fee Paid 7,040,860...

24

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16,237,181 FY2010 6,222,832 FY2011 59,831,257 FY2012 0 FY2013 0 FY2014 FY2015 FY2016 FY2017 FY2018 Cumulative Fee Paid 82,291,270 CH2MHill Plateau Remediation Company...

25

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 19,332,431 FY2011 23,956,349 FY2012 19,099,251 FY2013 0 FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 Cumulative Fee Paid 62,388,031 209,254,793 21,226,918 21,030,647 Fee...

26

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 0 FY2014 0 FY2015 0 FY2016 0 FY2017 0 FY2018 0 Cumulative Fee Paid 0 310,000 320,000 330,000 340,000 HPM Corporation DE-EM0002043 350,000 Firm Fixed Price Plus Award...

27

Contracts Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Support Commercial Support Science & Technologies Support ITER Contracts SNS Contracts Acquisition Compliance Small Business Programs Office Property Management...

28

Number  

Office of Legacy Management (LM)

' ' , /v-i 2 -i 3 -A, This dow'at consists ~f--~-_,_~~~p.~,::, Number -------of.-&--copies, 1 Series.,-a-,-. ! 1 THE UNIVERSITY OF ROCHESTER 1; r-.' L INTRAMURALCORRESPONDENCE i"ks' 3 2.. September 25, 1947 Memo.tor Dr. A. H, Dovdy . From: Dr. H. E, Stokinger Be: Trip Report - Mayvood Chemical Works A trip vas made Nednesday, August 24th vith Messrs. Robert W ilson and George Sprague to the Mayvood Chemical F!orks, Mayvood, New Jersey one of 2 plants in the U.S.A. engaged in the production of thorium compounds. The purpose of the trip vas to: l 1. Learn the type of chemical processes employed in the thorium industry (thorium nitrate). 2. Survey conditions of eeosure of personnel associated vith these chemical processes. 3. Obtain samples of atmospheric contaminants in the plant, as

29

Mastering the Interview Resources General Interview Skills  

E-Print Network (OSTI)

/article.aspx Case Interviews http://www.bcg.com/join_bcg/interview_prep/process/default.aspx http://www.mckinsey.com

30

Performance-based Contracting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance-based Contracting Performance-based Contracting [Reference: FAR 37.6; DEAR 970.1001] Overview This section provides guidance and instruction for the development and administration of Performance-Based Contracting concepts for the Department's management and operating contracts, and other major operating contracts, as appropriate. Background In 1997, the Department published a final rule (62 FR 34842) which implemented a number of recommendations principally in areas relating to the acquisition processes of its management and operating contracts. One of these recommendations involved the adoption of performance-based contracting concepts. Since the beginning of its contract reform initiatives, the Department has tested a number of approaches to conform its use of fee to such concepts. A core consideration in the application of

31

Option contracts  

Science Conference Proceedings (OSTI)

Many languages support behavioral software contracts so that programmers can describe a component's obligations and promises via logical assertions in its interface. The contract system monitors program execution, checks whether the assertions hold, ... Keywords: behavioral software contracts, programming language design, propabilistic spot checking, random testing

Christos Dimoulas, Robert Bruce Findler, Matthias Felleisen

2013-10-01T23:59:59.000Z

32

Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities: Cooperative Research and Development Final Report, CRADA Number CRD-08-309  

DOE Green Energy (OSTI)

This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement and verification processes; risk and responsibility allocation; and financial viability of projects.

Anderson, K.

2012-04-01T23:59:59.000Z

33

Service Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

actual installation of major plant equipment such as a centrifugal chillers, boilers, and large air compressors is typically excluded from the contract. Risk and warranty...

34

INL Contract Modifications  

NLE Websites -- All DOE Office Websites (Extended Search)

Modifications to Contract No. DE-AC07-05ID14517 Modifications to Contract No. DE-AC07-05ID14517 You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations > INL Contract > INL Basic Modifications Blue Line Free Acrobat Reader Link The documents listed below represent an electronic copy of modifications to the contract for the Management and Operation of the INL awarded to Battelle Energy Alliance, LLC. These documents are in PDF format. The Adobe Reader is required to access them. If you do not currently have the Acrobat Reader, you may download the Reader FREE by clicking on the icon at left. Blue Line Pending NUMBER DATE SIGNED DESCRIPTION File Size (in KB) 283 September 30, 2013 Funding 105 282 September 30, 2013 Funding 104 281 September 27, 2013 Funding 104

35

ORISE: Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

ORAU Contract with the U.S. Department of Energy ORAU Contract with the U.S. Department of Energy The documents listed below are in PDF format. You will need the Adobe Reader, which can be downloaded free from the Adobe Web site. Important Note: If you intend to print either the entire Oak Ridge Institute for Science and Education (ORISE) contract or any of the individual sections, you will need to make sure that you have enabled the document's notes to print. To do this from any of the PDFs below, go to the File menu and select Print. In the dialog box that opens, you will see a dropdown box labeled "Comments and Forms." From that dropdown menu, please select "Document and Markups." Then click the "OK" button to print. ORISE Contract (2.2 MB) - Entire contract Table of Contents

36

Contract No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract No. Contract No. ------------------ Contract jor Disposal ojSpent Nuclear Fuel and/or High-level Radioactive Waste THIS CONTRACT, entered into this ____ day of 20 ___ , by and between the UNITED STATES OF AMERICA (hereinafter referred to as the "Government"), represented by the UNITED STATES DEPARTMENT OF ENERGY (hereafter referred to as "DOE") and - - - - - - - - c - - - c - - - - - c - - - - - - - - - c - , (hereinafter referred to as the "Purchaser"), a corporation organized and existing under the laws of the State of _ _ _ _ _ _ _ _ _ _ __ (add as applicable: "acting on behalf of itself and - - - . "). Witnesseth that: Whereas, the DOE has the responsibility for the disposal of spent nuclear fuel and high-level radioactive waste of domestic origin from civilian nuclear power reactors in order to protect

37

SALES CONTRACT  

Office of Legacy Management (LM)

SALES CONTRACT SALES CONTRACT by and between the UNITED STATES DEPARTMENT OF ENERGY and the MIAMISBURG MOUND COMMUNITY IMPROVEMENT CORPORATION August 28,2008 TI-IIS SATRS CONTRACT made, entered into, and effective the 28th day of August 2008, between the MIAMISBURG MOUND COMMUNI'I'Y IMPROVEMENT CORPORATION (MMCIC), ail Ohio Corporation, located at 1 ' . 0. Box 232, Miamisburg, 01-1 45343-0232, hereinafter referred to as "Buyer," and the UNITED STATES OF AMERICA, acting by and Il~~ough the DEPARTMENT OF ENERGY, hereinafter referred to as "Seller." Buyer and Seller are hereinafter jointly referred to as "the Parties." WITNESSETH: WEIEREAS, Seller llas o w ~ ~ e d and maintained a facility at 1 Mound Road, City of Miamisburg, Montgomery County, Ohio, since late 1946 ("Mound Facility"); and

38

TRW CONTRACT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J-I- 1 SECTION J APPENDIX I REPORTS & PLANS REQUIREMENTS LIST Contract No.: DE-RW0000005 QA:QA J-I- 2 PART III -LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX I - REPORTS & PLANS REQUIREMENTS LIST Reporting Requirement Freq. Distribution Date Due 1. Annual Work Plans Y OPM&P, OGS As Directed 2. S/C small/disadvantaged contract Report (FM294/5) S CO April 25 and October 25 3. Cyber Security Program A OGS As Required, every 2 yrs

39

Service Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidelines for Obtaining Guidelines for Obtaining Best-Practice Contracts for Commercial Buildings Operation and Maintenance Service Contracts Prepared with funding from the U.S. EPA December 1997 PECI Acknowledgements Special thanks to the following people for their ongoing contributions and careful review of the document: Byron Courts, Director of Engineering Services, and Dave Rabon, Chief Engineer, Melvin Mark Pete Degan, Director of Customer Marketing, Landis/Staefa David Fanning, HVAC Coordinator, EXPRESS Bil Pletz, Facility Manager, Intel Mike Sanislow, Service Channel Development Leader, Honeywell Home and Building Karl Stum, Director of Technical Services, PECI Tom Walton, President, United Service Alliance For additional copies of this guidebook, contact: Portland Energy Conservation Inc. (PECI)

40

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fee September, 2013 Site: Portsmouth Paducah Project Office Contract Name: Operation of DUF6 Contractor: Babcock & Wilcox Conversion Services, LLC Contract Number:...

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Motivational Interviewing Treatment Integrity  

E-Print Network (OSTI)

Motivational interviewing is a client-centered, goaloriented approach to counseling, with the objective to increase a persons intrinsic motivation for behavior change through the exploration and resolution of ambivalence (Miller & Rollnick, 2002). The aims of motivational interviewing are to increase a persons motivation for behavior change and to strengthen that commitment to change. The spirit of this approach emphasizes collaboration over confrontation, evocation over education, and autonomy over authority (Miller & Rollnick, 2002). The technique has four guiding principles (Miller,

unknown authors

2011-01-01T23:59:59.000Z

42

Using Structured Interviewing Techniques  

E-Print Network (OSTI)

GAO assists congressional decisionmakers in their deliberative process by furnishing analytical information on issues and options under consideration. Many diverse methodologies are needed to develop sound and timely answers to the questions that are posed by the Congress. To provide GAO evaluators with basic information about the more commonly used methodologies, GAOs policy guidance includes documents such as methodology transfer papers and technical guidelines, This methodology transfer paper on using structured interviewing techniques discusses how GAO evaluators should incorporate structured interview techniques when appropriate to performing our work. It explains when these techniques should be

Gao/pemd-. Preface; Werner Grosshans

1991-01-01T23:59:59.000Z

43

Energy Savings Performance Contracts Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENERGY SAVINGS PERFORMANCE CONTRACTS SUMMARY ENERGY SAVINGS PERFORMANCE CONTRACTS SUMMARY Site Contract Number Delivery or Task Order # Contractor Performance Period Contract Value Contract Description Richland DE-AC06-97RL13184 N/A Johnson Controls, Inc. 11/15/1996- 11/14/2021 $160.7M Conversion from central coal-fired steam plant to decentralized diesel boilers for Hanford Areas 200 & 300 (Site specific, standalone contract) DE-AM36-97EE73568 DE-AT06-09RL14923 Johnson Controls, Inc. 10/10/2008- 3/31/2033 $19.9M HVAC, Automation, Boiler Improvements Savannah River DE-AM36-02-NT41457 DE-AT09-09SR22572 Ameresco Federal Solutions 5/15/2009- 4/15/2031 $795M Biomass Cogeneration Facility and K and L Area Heating Plants

44

Interview of Les Hiatt  

E-Print Network (OSTI)

Interview of Les Hiatt by Alan Macfarlane on 14th July 2005 0:05:07 Introduction; born 1931 in Gilgandra, New South Wales; father son of English migrants; his father became a miller; father became a book-keeper and later manager of flour mill...

Hiatt, Les

2005-08-24T23:59:59.000Z

45

Interview with Philip Gulliver  

E-Print Network (OSTI)

. for a flour mill and similar for a tannery; both now closed by a new factories and a confectioner whose records have also been examined; also checked migration of workers; interviewed people and done participant observation 0:28:15 Participant...

Gulliver, Philip

2004-06-29T23:59:59.000Z

46

Contract No  

NLE Websites -- All DOE Office Websites (Extended Search)

J J J-J-1 ATTACHM ENT J.10 APPENDIX J TREATIES AND INTERNATIONAL AGREEM ENTS/WAIVED INVENTIONS Applicable to the Operation of PPPL Contract No. DE-AC02-09CH11466 United States Department of Energy Agreement Listing J-J-2 Expiration Date DOE Office Title 1-6-97; exec 1-6-92 PO Agreement relating to scientific and technical cooperation between the Government of the United States of America and the Government of the Republic of Korea. 7-6-99; exec 7-6-94 IA and Department of State Agreement between the Government of the United States of America and the Government of Estonia on science and technology cooperation. 7-6-99; exec 7-6-94 IA and Department of State Agreement between the Government of the United States of America and the Government

47

Interview with Owen Lattimore  

E-Print Network (OSTI)

coming in from Mongolia, Xinjiang (Chinese Turkistan), and Tibet; fascinating to see camels coming into the rail freight-yards delivering goods; problem of how to get the wool we had contracted for through lines to Tianjin so it could be shipped... on terrain, what are the problems of herding and keeping animals in good condition; now writing for Scientific American a paper on long-haul caravans 0:10:18 In 1920s not only bringing down wool but vast quantities of sheeps intestines to be sold...

Lattimore, Owen

2004-12-10T23:59:59.000Z

48

SYMMETRY Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

SYMMETRY SYMMETRY Contract - - L E G A L N O T I C E The Enrico Fermi I n s t i t u t e f o r Nuclear S t u d i e s and Department o f Physics, t h e U n i v e r s i t y of Chicago, Chicago, I l l i n o i s Outline of Talks Delivered a t t h e I n t e r n a t i o n a l Conference on Elementary P a r t i c l e s and a t t h e Symposium on Elementary P a r t i c l e s Kyoto, September 1965 Revised January 1 9 6 6 FELLEASED @R ANNOUNCEMENT N J C U SCIENCE ABSTRACTS No. AT ( 11-1) -264 EFINS 06-19 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

49

Contracts for dispatchable power  

Science Conference Proceedings (OSTI)

Competitive bidding for electric power is maturing. Increasing numbers of utilities are soliciting proposals from private suppliers. The amount of capacity being sought is increasing, and potential suppliers appear to be abundant. Analysis of these developments still remains limited. Evidence on the behavior of this market is scarce and sketchy. The underlying economic principles that are shaping the market have not clearly been articulated. In this report we examine the economics of competitive bidding both empirically and analytically. Previous study of this market has focused on the evaluation criteria specified in Requests for Proposals (RFPs), and highly aggregated summary statistics on participation and results. We continue the examination of RFPs, but also survey the details of long term contracts that have emerged from competitive bidding. Contracts provide a new level of specific detail that has not been previously available. 68 refs., 13 figs., 25 tabs.

Kahn, E.P.; Stoft, S.; Marnay, C.; Berman, D.

1990-10-01T23:59:59.000Z

50

An Interview with Danilo Dolci  

E-Print Network (OSTI)

nuvole ed immaginano la bomba atomica. Queste cose devonoHiroshima fosse esplosa una bomba atomica. AN INTERVIEW WITH

Lazazzera, Teresa

1981-01-01T23:59:59.000Z

51

Performance Contracting and Energy Efficiency in the State Government Market  

E-Print Network (OSTI)

Resources to Assist State Agencies in ESPC24 4.1.3 Contract26 4.2.3 State Agencies approach to Budgetconducted interviews of state agency staff responsible for

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

52

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011...

53

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

54

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

55

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

56

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual...

57

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY...

58

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

59

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

60

AMWTP Contract Modifications  

NLE Websites -- All DOE Office Websites (Extended Search)

ADVANCED MIXED WASTE TREATMENT PROJECT (AMWTP) Idaho Treatment Group, LLC (ITG) Modifications to Contract No. DE-EM0001467 You are here: DOE-ID Home > Contracts, Financial...

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Contract Management Plan Outline  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TABLE OF CONTENTS TABLE OF CONTENTS 1.0 Introduction/Overview ..................................................................................................... 1 2.0 Purpose/Applicability/Updates and Distribution........................................................... 1 3.0 Contract Summary ........................................................................................................... 3 4.0 Organizational Roles and Contract Oversight Responsibilities ................................... 6 5.0 Contract Authorities, Delegations and Limitations....................................................... 8 6.0 Contract Administration and Oversight....................................................................... 12 7.0 Communication Protocols ..............................................................................................

62

Contract | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne's Prime Contract is the contract between the U.S. Department of Argonne's Prime Contract is the contract between the U.S. Department of Energy and UChicago Argonne, LLC that sets out the terms and conditions for the operation of Argonne National Laboratory. Please direct general comments and questions about the Argonne Prime Contract to William Luck. Navigation Tips Listed below are tips on navigating through the Argonne Prime Contract. The navigation menu contains the currently available options. Select the main Argonne Prime Contract at any time to return to the main menu. When searching the text of the Argonne Prime Contract, the previous/next hit buttons will take you to the previous/next occurrence of your search term(s) in the current section. Search Table of Contents Advanced Search List of Modifications List of Appendices

63

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fee 0 May 2011 - September 2015 June 2013 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 419,202,975...

64

Contracting for Collaborative Services  

Science Conference Proceedings (OSTI)

In this paper, we analyze the contracting issues that arise in collaborative services, such as consulting, financial planning, and information technology outsourcing. In particular, we investigate how the choice of contract type---among fixed-fee, time-and-materials, ... Keywords: consulting, contracting, joint production, principal/agent models, services

Guillaume Roels; Uday S. Karmarkar; Scott Carr

2010-05-01T23:59:59.000Z

65

Interview  

E-Print Network (OSTI)

every two years; the three major ideas were Thatcherism, the decline of the Left, and new times post-Fordism; I am very proud of what we achieved in that period, and it was for me one of the two most stimulating things I have ever done in my life... by limping on into oblivion, so I did so 12:04:19 I also co-started Demos, but I am not as proud of that as Marxism Today; we had thought we should try and set up a new magazine and also a think-tank because what Marxism Today was not good...

Jacques, Martin; Macfarlane, Alan

66

Interview  

Science Conference Proceedings (OSTI)

Jan 31, 2011 ... Engineering continues to grow ever more rich and diverse, and ... This is healthy, but this diversity makes it challenging to keep a focus on the...

67

INTERVIEW OF PROFESSOR DAVID LEVINSON OUTLINE OF INTERVIEW QUESTIONS  

E-Print Network (OSTI)

that the story of transportation policy can tell us what transportation, is, does, and might do in the future on transportation field in the U.S., today we'd like to interview you on a few topics on transportation in the West and professional background? Especially how did you get into the transportation field? I have long been interested

Levinson, David M.

68

EM Utility Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 EM UTILITY CONTRACT Site State Supplier Executed Contract Type DOE Contract # East Tennessee Technology Park TN Tennessee Valley Authority 4/27/2007 Energy supply contract (retail) DE-AC05-07OR23242 Hanford WA Bonneville Power Administration 10/1/2001 Transmission Service Agreement Hanford WA Bonneville Power Administration 10/1/2011 Power Sales Agreement (retail) Moab UT Paducah KY Electric Energy, Inc. (EEI as agent for DOE) Original Power Contract Portsmouth OH Pike Natural Gas 2/28/2007 Negotiated contract Portsmouth OH Ohio Valley Electric Corporation (OVEC) 9/10/2008 Letter Agreement DE-AC05-03OR22988 Savannah River Site SC South Carolina Electric & Gas

69

UESC Contracting Officer Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAY 23, 2013 MAY 23, 2013 Presented by: Alice Oberhausen Former DoD Contracting Officer UESC PROCESSES - CONTRACTING OFFICER LINGERING QUESTIONS * With so much legislation surrounding the requirement for the reduction of energy in Federal facilities, and the authorization for entering into contracts with servicing Utility companies, why is there still confusion about the details in the acquisition processes? A Sampling of Questions THE FOLLOWING SLIDES ILLUSTRATE SOME OF THE QUESTIONS THAT CONTINUE TO ARISE FROM THE ACQUISITION COMMUNITY AS NEWCOMERS EXPLORE MEETING ENERGY GOALS THROUGH UESC METHODS * Should the Service Contract Act apply to the post-award requirement to provide Performance Assurance analysis and reports?

70

NEPA Contracting Reform Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by * maximizing competition and use of incentives * using past performance information in awarding work * managing the NEPA process as a project This guidance provides: < model statements of work < information on contract types and incentives < direction on effective NEPA contract management by the NEPA Document Manager < a system for measuring NEPA process costs < NEPA contractor evaluation procedures < details on the DOE NEPA Web site U.S. Department of Energy, Office of NEPA Policy and Assistance, December 1996 NEPA CONTRACTING REFORM GUIDANCE Table of Contents 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

71

Contract Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Contract Management Berkeley Site Office (BSO) BSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: bsowebinfo@bso.science.doe.gov Contract Management Print Text Size: A A A RSS Feeds FeedbackShare Page Contract Summary LBNL is managed and operated by the Regents of the University of California under prime contract number DE-AC02-05CH11231. This is a cost-reimbursement M&O performance-based contract with special performance fee and award term provisions. As of 2012, the Contractor has earned a total of 5 years towards the possible additional 15 years of the current contract term. The contract period of performance is April 19, 2005 - May 31, 2015, for each

72

Interview with Andrew C. Kadak  

Science Conference Proceedings (OSTI)

This article is an interview with the president and Chief Executive Officer of the Yankee Atomic Electric Company about a wide variety of aspects of the decommissioning of the Yankee Nuclear Power plant. Included are discussions of political aspects, decommissioning schedules, local impacts, technical issues of decommissioning, personnel management during decommissioning, etc.

Schabes, D. [ed.

1996-01-01T23:59:59.000Z

73

Labor Standards Interview Form | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards Interview Form Labor Standards Interview Form SF 1445.pdf More Documents & Publications Labor Standards for Construction Chapter 22 - Labor Standards for Construction CRB...

74

CRB Interview Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process CRB Interview Process 6CRBinterviewprocess.pdf More Documents & Publications CRB Interview Guidance Microsoft Word - Policy Flash 2008-13.doc Microsoft Word - DRAFT CRB...

75

FY 2012 Service Contract Inventory Analysis Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Service Contract Inventory Service Contract Inventory Analysis Plan Department of Energy Office of Acquisition and Project Management Strategic Programs Division (MA-622) December 2012 Department of Energy FY 2012 Service Contract Inventory Plan for Analysis The Department of Energy (DOE) approach will be performed in accordance with the criteria set out in Consolidated Appropriations Act, 2010, (Pub. L. No. 111-117, § 743 (2009)) and Appendix D of the November 5, 2010 OMB Memorandum on Service Contract Inventories, and will ultimately identify contracts for a more in-depth review. DOE will develop the basic inventory in accordance with OMB guidance using FPDS-NG data to address a number of the inventory requirements consistent with the Consolidated Appropriations Act. APM will

76

FY 2011 Service Contract Inventory Analysis Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Service Contract Inventory Analysis 1 Service Contract Inventory Analysis Plan Department of Energy Office of Procurement & Assistance Management Strategic Programs Division (MA-622) December 2011 Department of Energy FY 2011 Service Contract Inventory Plan for Analysis The Department of Energy (DOE) approach will be performed in accordance with the criteria set out in Consolidated Appropriations Act, 2010, (Pub. L. No. 111-117, § 743 (2009)) and Appendix D of the November 5, 2010 OMB Memorandum on Service Contract Inventories, and will ultimately identify contracts for a more in-depth review. DOE will develop the basic inventory in accordance with OMB guidance using FPDS-NG data to address a number of the inventory requirements consistent with the Consolidated Appropriations Act and collect

77

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 1. REQUISITION NUMBER SP0600-06-0525 PAGE 1 OF 19 2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER SP0600-06-Q-0408 6. SOLICITATION ISSUE DATE March 8, 2006 7. FOR SOLICITATION INFORMATION CALL: a.NAME Leslie Simpson (703) 767-8536 b. TELEPHONE NUMBER (no collect calls) Phone: See Block 7A Fax: (703) 767-8757 8. OFFER DUE DATE/LOCAL TIME March 15, 2006, 12:00 Noon, Local Time, Fort Belvoir, Virginia 9. ISSUED BY CODE SP0600 10. THIS ACQUISITION IS UNRESTRICTED ⌧ SET ASIDE 100 % FOR

78

Contracting Polymer with Current  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracting Polymer with Current Contracting Polymer with Current Name: Ian Status: student Grade: 9-12 Location: PA Country: USA Date: Summer 2011 Question: Hello and thank you in advance. I have previously read of a material ( a kind of "rubber") that contracts when an electric current is applied. My question is what is this material, how does it work/what is it made of? Thank you very much. Replies: Hi Ian, I believe the material you are referring to is a kind of piezoelectric rubber. Piezoelectric materials (usually they are special types of ceramics or crystals) produce an electrical voltage when compressed of otherwise subjected to stress. They also do the opposite... they slightly expand or contract when a voltage is applied. But the amount they expand or contract is very small indeed. For example, one square meter of the recently discovered piezoelectric rubber materials typically contracts a mere 100 picometers for ever applied volt. Translated into everyday measurements, this means that if you apply a voltage of 1 Volt to a one foot long piece of this rubber, it will only contract less than half a billionth of an inch! Applying 100 volts will cause it to contract just under 50 billionths of an inch!

79

Pace of Heart Contractions  

NLE Websites -- All DOE Office Websites (Extended Search)

Pace of Heart Contractions Pace of Heart Contractions Name: Charlotte Location: N/A Country: N/A Date: N/A Question: why is there a slight delay in the passage of electrical activity at the atrioventricular node? Replies: This is to allow sufficient time for the atria to finish contraction and for blood to flow from the atria into the ventricles. From the SA node (the pacemaker) the impulse spreads over the atria and causes them to contract. From the SA the impulse goes to the AV node. Here the fibers narrow, similar to traffic trying to squeeze from four lanes down to two, and this causes the impulse to slow down. Once the impulse has made it through to the bundle of His, the conduction is rapid once again and the entire ventricular myocardium undergoes depolarization and contracts simulataneously.

80

UESC Contracting Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracting Guide Contracting Guide Karen Thomas National Renewable Energy Laboratory Purpose of the UESC Guide * The UESC Contracting Guide will include: - Information, sample documents, and templates needed to implement a task order under the GSA Areawide * FEMP is developing this initial guide for DOE sites * Subsequent books will be developed for other agencies as requested Objectives * Define UESC * Provide the steps involved in developing a UESC * Provide objectives, strategies, samples, and templates * Provide best practices and lessons learned Frequently Asked Questions * What is a UESC? * Is it legal? * What is the maximum allowable contract term? * Can renewables be included in a UESC? * Can rebates be accepted and used in the project? * What is a utility?

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Industrial Energy Procurement Contracts  

E-Print Network (OSTI)

Rates are going down and services are improving! Or are they? As opportunities to directly contract for energy expand from the larger industrials to include mid-market companies, existing energy supply and service contracts will be renegotiated and new ones developed. Many of these mid-level industrial customers typically lack in-house expertise on energy procurement, yet their operations use significant amounts of energy. This paper looks at some of the issues involved in the main terms of a procurement contract, as well as issues in contract formation and termination. Finally the paper reviews some of the recent energy aggregation and outsourcing deals to highlight some that worked and some that didn't.

Thompson, P.; Cooney, K.

2000-04-01T23:59:59.000Z

82

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects:...

83

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

84

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP)...

85

DOE Facility Management Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracts DOE Facility Management Contracts DOE site facility mgt contracts Internet Posting 10-11-11.pdf More Documents & Publications DOEMajorSiteFacilityContracts2-201...

86

CRB Interview Guidance | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

More Documents & Publications CRB Interview Process Microsoft Word - DRAFT CRB Interview Guidance.doc Audit of Department of Energy's Contractor Salary Increase Funds, CR-B-97-02...

87

Interview with Dieter Richter | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

discusses "common thread" linking unconventional superconducting materials Dec. 2011, Interview by Deborah Counce Douglas Scalapino Professor Emeritus Douglas Scalapino....

88

Access to recorded interviews: A research agenda  

Science Conference Proceedings (OSTI)

Recorded interviews form a rich basis for scholarly inquiry. Examples include oral histories, community memory projects, and interviews conducted for broadcast media. Emerging technologies offer the potential to radically transform the way in which recorded ... Keywords: Interviews, access technology, oral history, speech indexing, spoken word archives

Franciska De Jong; Douglas W. Oard; Willemijn Heeren; Roeland Ordelman

2008-06-01T23:59:59.000Z

89

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 4th Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 100% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

90

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 1st Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 94% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

91

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 2nd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 96% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

92

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 3rd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 98% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

93

Geothermal sales contracts  

Science Conference Proceedings (OSTI)

This paper discusses fundamental concepts to be considered in negotiating contracts for the sale and purchase of high temperature geothermal steam utilized for the generation of electric power. Although similar in some respects to natural gas sales contracts, contracts for the sale of geothermal energy are unique in many ways. In particular, the staged development of distinct power-generating units near supplying wells requires contractual mechanisms to permit buyer and seller to determine collectively how and when field expansion should occur. The possibility of premature reservoir depletion and technological difficulties necessitates carefully drawn escape provisions. Responsibility for high-cost gathering systems and reinjection facilities must be determined. Complex pricing formulas may reflect distributions of risks between buyer and seller. In the face of such difficult drafting problems, little precedent is available to assist the negotiator or the draftsman.

Humphrey, R.L. (Union Oil Co., Los Angeles, CA); Parr, C.J.

1982-01-01T23:59:59.000Z

94

Green Initiatives and Contracting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GSA Is Now Training Contracting GSA Is Now Training Contracting Officers In Green Purchasing Green Purchasing for the Federal Acquisition Work Force * introduction to the federal green purchasing program * assists learners with identifying green products * discusses factors that shape federal green purchasing initiatives https://cae.gsa.gov 2 "There's some challenges here" "Environmental Aisle" in the GSA Advantage electronic-purchasing website for federal buyers to find green products Environmental Protection Agency provides regular updates on EPA- approved "environmentally preferable" products. 3 GSA Designations for Green Products * Building Construction * Traffic Control * Landscaping * Roadway Construction * Building Interior *

95

_Part II - Contract Clauses  

National Nuclear Security Administration (NNSA)

M515 dated 9/9/13 M515 dated 9/9/13 Contract DE-AC04-94AL85000 Modification No. M202 Part II - Contract Clauses Section I TABLE OF CONTENTS 1. FAR 52.202-1 DEFINITIONS (JAN 2012) (REPLACED M473) ............................................................... 8 2. FAR 52.203-3 GRATUITIES (APR 1984)..................................................................................................... 8 3. FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984) ............................................. 9 4. FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006) (REPLACED M264) ............................................................................................................................ 10 5. FAR 52.203-7 ANTI-KICKBACK PROCEDURES (OCT 2010) (REPLACED M443) ......................... 10

96

Software change contracts  

Science Conference Proceedings (OSTI)

Incorrect program changes including regression bugs, incorrect bug-fixes, incorrect feature updates are pervasive in software. These incorrect program changes affect software quality and are difficult to detect/correct. In this paper, we propose the ... Keywords: JML, change contract, regression testing, software evolution

Dawei Qi; Jooyong Yi; Abhik Roychoudhury

2012-11-01T23:59:59.000Z

97

Idaho Cleanup Project Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

and Infrastructure 28 KB C.8-11 RH-TRU Waste 114 KB C.8-12 LLWMLLW 87 KB C.8-13 RH TRU Hot Cell Equipment Upgrades 33 KB The following Section C Exhibits apply to the contract...

98

The Minimum Price Contract  

E-Print Network (OSTI)

A minimum price contract is one of many tools a marketer may use to better manage price and production risk while trying to achieve financial goals and objectives. This publication discusses the advantages and disadvantages involved in this marketing program and the situations when it can be used.

Waller, Mark L.; Amosson, Stephen H.; Welch, Mark; Dhuyvetter, Kevin C.

2008-10-17T23:59:59.000Z

99

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I~' CONTRACT  

National Nuclear Security Administration (NNSA)

I~' I~' CONTRACT ID CODE IPAGE OF PAGES DE-NR0000031 . 1 I 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. I 5. PROJECT NO. (If applicable) 003 Same as Block 16G . N~ 6. ISSUED BV CODE 7. ADMINISTERED BV (If other than Item 6) Code I U.S. Department of Energy Pittsburgh Naval Reactors Office P.O. Box 109 West Mifflin, PA 15122-0109 8. NAME AND ADDRESS OF CONTRACTOR (No. street, county, State and ZIP Code) (*...) 9.A. AMENDMENT OF SOLICITATION NO. Bechtel Marine Propulsion Corporation 9.6. DATED (SEE ITEM 11) 50 Beale Street San Francisco, CA 94105-1895 lOA MODIFICATION OF Contract/Order NO. *... DE-NROOOOO31 10.B. DATED (SEE ITEM 13) CODE N/A I FACILlTV CODE N/A Seotember 18, 2008 11. THIS ITEM ONLV APPLIES TO AMENDMENTS OF SOLICITATIONS D The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Dis

100

Contracting with California State Agencies - New Model Contract...  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracting with California State Agencies - New Model Contract Language for DOE Laboratories Speaker(s): Jeff Weiner Date: March 5, 2009 - 12:00pm Location: 90-3122...

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

102

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

103

11. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 PAGE 1 OF2 AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGES 2. AMENDMENT/MODIFICATION NO. I 3. EFFECTIVE DATE M191 See Block 16C 4. REQUISITION/PURCHASE I 5. PROJECT NO. (If applicable) REQ. NO. 6.ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 87185-5400 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Pantex Site Office P.O. Box 30030 Amarillo, TX 79120 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 CODE I FACILITY CODE SA. AMENDMENT OF SOLICITATION NO.

104

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

105

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

106

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

107

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

108

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

109

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

110

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

111

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

112

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

113

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

114

NREL: Director's Page - Interviews and Articles  

NLE Websites -- All DOE Office Websites (Extended Search)

of Let's Talk interviews NREL Director Dr. Dan Arvizu about NREL's role in American energy policy and the challenges facing renewable energy development. Dr. Arvizu also...

115

Section Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. List A Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations, unless relief has been granted in writing by the appropriate regulatory agency. Omission of any applicable law or regulation from this list does not affect the obligation of the contractor to comply with such law or regulation. Laws & Regulations Title 10 CFR Part 2 Rules of Practice for Domestic Licensing Proceedings and Issuance of Orders

116

Chapter 16- Types of Contracts  

Energy.gov (U.S. Department of Energy (DOE))

16.2 - Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts

117

Chapter 37 - Service Contracting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 - Service Contracting Chapter 37 - Service Contracting 37.1SupportServiceContracting0.pdf 37.114FederalContractorEmployeeRolesintheFederalWorkplace0.pdf...

118

Major Conformed Contract Links | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Links More Documents & Publications DOE Facility Management Contracts DOEsitefacilitymgtcontractsInternetPosting3-21-11.pdf DOEMajorSiteFacilityContracts2-2011.pdf...

119

WHAT'S NEW FOR CONTRACTING OFFICERS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GUIDE ___________________________________________________________CHAPTER 42.101 GUIDE ___________________________________________________________CHAPTER 42.101 WHAT'S NEW FOR CONTRACTING OFFICERS The Contracting Officer must obtain a waiver from the Procurement Director before electing to forgo obtaining any audit services for each proposal considered for award in a competition for a cost-reimbursement contract expected to exceed $1,000,000. The waiver request must document explicitly how the Contracting Officer plans to perform cost realism analysis without audit support. A waiver from the Procurement Director is not required for a competition for a cost-reimbursement contract not expected to exceed $1,000,000, but the Contracting Officer must document the contract file to explain explicitly how he or she plans to perform cost

120

Prime Contract Number DE-AC36-98GO10337 Section I Contract Clauses...  

NLE Websites -- All DOE Office Websites (Extended Search)

6. 952.227-13 PATENT RIGHTS-ACQUISITION BY THE GOVERNMENT. (SEP 1997) AND 970.5204-72 PATENT RIGHTS-PROFIT MAKING MANAGEMENT AND OPERATING CONTRACTORS (FEB 1995) (a) Definitions....

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REQUIREMENTS BASED SURVEILLANCE AND REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM General Information: A. Evaluator:_______________________ Organization:___________________ Ph:_________________ B. Interviewee:_____________________ Organization:____________________ Ph:_________________ C. Activity Name :_____________________________________________________ General/Administrative Support Mission/Facility Support (Circle One) D. Safety Related: _____Yes _____No E. Procedure #: _______________________________________________________ F. Charge Number: _____________________________________________________ G. Frequency for Conducting the Activity: (Circle One) Hourly Shiftly Daily Weekly Bi-weekly Monthly Quarterly Semi-Annually Annually

122

Service Contract Inventory | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Service Contract Inventory Service Contract Inventory DOE 2012 Service Contract Inventory 122712.xlsx DOE FY12 Analysis Plan MAX 122712.pdf DOEFY11ServiceContractInventory0.xl...

123

Site Acquisition Description/ Category Contracting Office Solicitation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Description Category Contracting Office Solicitation Method Contract Type Estimated Dollar Range Pre-Solicitation Conference Industry Meetings Draft- Solicitation Synopsis...

124

Contract Disputes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conflict Prevention and Resolution » Contract Disputes Conflict Prevention and Resolution » Contract Disputes Contract Disputes The Director, Office of Conflict Prevention and Resolution, is available to discuss inclusion of ADR provisions in contracts, to assist in determining whether ADR is appropriate, and to find neutrals for specific disputes. See: Civilian Board of Contract Appeals DOE Procurement Acquisition Letter on using ADR for disputes under the CDA (PDF); ADR Provisions in Federal Acquisition Regulation (FAR); and ADR Provisions in 48 CFR - CHAPTER 1 - PART 33 (Protests, Disputes and Appeals), 33.214 Alternative Dispute Resolution (ADR). Applications for Exceptions Conflict Prevention and Resolution Contract Disputes Environmental Conflict Resolution Field Office Programs HQ Mediation Program Ombuds Program

125

An Interview with Vaughan Merlyn on Management  

Science Conference Proceedings (OSTI)

Vaughan Merlyn, who is a management consultant, researcher, and author, has had as his primary focus for more than three decades now has been the use of information and information technology for business value creation. He was interviewed about software ...

Ubiquity staff

2008-04-01T23:59:59.000Z

126

PNNL: Doing Business - Contracting Mechanisms  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracting Mechanisms for Work with PNNL Does your small business need expert advice on a technical problem? Does your university research project require state-of-the-art...

127

QA Standard Contract Language Deliverable  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA Contract Language Department of Energy Washington, DC 20585 AUG 2 1 2009 MEMORANDUM FOR DISTRIBUTION THROUGH: FROM: JAMES M. OWENDOFF CHIEF OPERATIONS OFF1 ENVIRONMENTAL...

128

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I '. I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

129

DOE Contracting Officers and Contract Specialists | Scientific and  

Office of Scientific and Technical Information (OSTI)

DOE DOE DOE Contracting Officers and Contract Specialists Print page Print page Email page Email page A Contracting Officer is the DOE official authorized to execute awards on behalf of DOE and is responsible for the business management and non-program aspects of the financial assistance process. They are responsible for ensuring that the receipt of required interim and final scientific/technical reporting deliverables as identified on DOE F 4600.2, Federal Assistance Reporting Checklist, and in the contract are monitored and provided to DOE/OSTI. Identification of Required DOE Deliverables The Departmental requirement for scientific/technical reporting for this type of award or contract is stated in DOE O 241.1B, 10 CFR 600, and 48 CFR 935.010. The initiator of the procurement request, usually the sponsoring program

130

Synthesis of Innovative Contracting Strategies Used for Routine and  

E-Print Network (OSTI)

Management Contracts, Asset Maintenance Contracts, Performance Specified Maintenance Contracts (PSMC), Managing Agent Contracts, Performance-Based Contracts, Total Maintenance Contracting, and other contract acceptable. Because TxDOT had not previously measured maintenance conditions, a system had to be developed

Texas at Austin, University of

131

Federal Energy Management Program: Utility Contract Competition  

NLE Websites -- All DOE Office Websites (Extended Search)

Competition to someone by E-mail Competition to someone by E-mail Share Federal Energy Management Program: Utility Contract Competition on Facebook Tweet about Federal Energy Management Program: Utility Contract Competition on Twitter Bookmark Federal Energy Management Program: Utility Contract Competition on Google Bookmark Federal Energy Management Program: Utility Contract Competition on Delicious Rank Federal Energy Management Program: Utility Contract Competition on Digg Find More places to share Federal Energy Management Program: Utility Contract Competition on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts Types of Contracts Laws & Regulations Best Practices Financing Decrease Interest Buydown & Buyout Approaches Contract Competition Diversify Project Portfolios

132

Contract RBAC in cloud computing  

Science Conference Proceedings (OSTI)

Cloud computing is a fast growing field, which is arguably a new computing paradigm. In cloud computing, computing resources are provided as services over the Internet and users can access resources based on their payments. The issue of access control ... Keywords: Cloud computing, Contract, Contract RBAC, Datacenter, RBAC

Hsing-Chung (Jack) Chen, Marsha Anjanette Violetta, Cheng-Ying Yang

2013-11-01T23:59:59.000Z

133

Volume 2 Appendices: Sample Solicitation and Contracting Document  

Science Conference Proceedings (OSTI)

Appendices for the report A Guide to Performance Contracting with ESCOs. The appendices include a sample solicitation and contracting document. These templates were adapted from State of Idaho Division of Public Works materials. They do not attempt to identify or address all circumstances or conditions you may encounter or desire. Adapt them to meet your needs. Appendix A contains sample forms related to a Request for Qualifications (RFQ). Sample documents include an RFQ announcement, an RFQ cover letter, a site visit registration form, and an interview announcement. Appendix A also contains examples outlining contract terms, project schedules, evaluation criteria, an Energy Service Company (ESCO) response, and a Technical Facility profile. Appendix B outlines the Commissioning team roles and responsibilities. This agreement covers the Technical Energy Audit and Project Development Agreement, including details of the project, including scope of work and termination terms. Appendix C offers an example of an Energy Performance Contract. The contract outlines the Energy Management Plan agreed upon by the ESCO, including project responsibilities, energy savings measurement and calculation methods, and projected financial performance.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

134

ORISE Contract, PART I - SCHEDULE, Section G Contract Administration Data  

NLE Websites -- All DOE Office Websites (Extended Search)

G G CONTRACT ADMINISTRATION DATA G.1 CORRESPONDENCE PROCEDURES (OCT 2004) ................................................... 3 G.2 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (MAY 1997) ............... 3 G.3 CONTRACT ADMINISTRATION (MAY 1997).......................................................... 4 G.4 PAYMENT OF BASE FEE AND AWARD FEE (NOV 2004)..................................... 4 Section G - Page 1 of 4 G.5 COST REPORTING REQUIREMENTS INVOLVING RECOVERY ACT ....... 4 PROJECT WORK (APR 2009) G.6 INDIRECT CHARGES INVOLVING RECOVERY ACT PROJECT .................4 WORK (APR 2009) G.7 PAYMENT OF FIXED FEE ..................................................................................4 DE-AC05-06OR23100

135

ARM - Carlos Sousa Interview (English Version)  

NLE Websites -- All DOE Office Websites (Extended Search)

DeployementCarlos Sousa Interview (English Version) DeployementCarlos Sousa Interview (English Version) Azores Deployment AMF Home Graciosa Island Home Data Plots and Baseline Instruments Satellite Retrievals Experiment Planning CAP-MBL Proposal Abstract and Related Campaigns Science Questions Science Plan (PDF, 4.4M) Rob Wood Website Outreach Backgrounders English Version (PDF, 363K) Portuguese Version (PDF, 327K) AMF Posters, 2009 English Version Portuguese Version Education Flyers English Version Portuguese Version News Campaign Images Carlos Sousa Interview (English Version) From Graciosa to India. Thanks to the Atmospheric Station. (From Aςoriano Oriental, March 5, 2012) Carlos Sousa works on an instrument at the ARM India site. Carlos Sousa works on an instrument at the ARM India site. To be at the right place at the right time, can change a person's life.

136

Utility Energy Service Contracts - Lessons Learned  

NLE Websites -- All DOE Office Websites (Extended Search)

Service Contracts-Lessons Learned Service Contracts-Lessons Learned Utility Energy Services Contracts Lessons Learned Water Conservation Negotiating Financing Lowering Finance Rates Utility Energy Service Contracts-Lessons Learned 2 -- FEDERAL ENERGY MANAGEMENT PROGRAM Contents Introduction .............................................................................................................................................................................3 Financing Utility Energy Services Contracts ..........................................................................................................................3 Understanding Financing Factors ...........................................................................................................................................3

137

Utility Energy Service Contracts - Lessons Learned  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Service Contracts-Lessons Learned Service Contracts-Lessons Learned Utility Energy Services Contracts Lessons Learned Water Conservation Negotiating Financing Lowering Finance Rates Utility Energy Service Contracts-Lessons Learned 2 -- FEDERAL ENERGY MANAGEMENT PROGRAM Contents Introduction .............................................................................................................................................................................3 Financing Utility Energy Services Contracts ..........................................................................................................................3 Understanding Financing Factors ...........................................................................................................................................3

138

FINAL CONTRACT WITH OWNER 1 TOWN OF BABYLON  

E-Print Network (OSTI)

of the number and gender in which used, shall be deemed to include any other number and any other gender,330.00 DEDUCTIONS: LESS: Applied Energy Audit Expense $250.00 LESS: LIPA Rebate (@10% of qualified costs) TBD1 TOTAL DEDUCTIONS from CONTRACT AMOUNT $250.00 NET AMOUNT of BENEFIT ASSESSMENT $11,080.00 ESTIMATED ANNUAL ENERGY

Kammen, Daniel M.

139

Interview of Dan McKenzie  

E-Print Network (OSTI)

school in Kensington; mother's background was completely different; she was brought up in Leeds and father was a labourer; she got a State Scholarship and applied to come to Newnham to read English; at her interview made her read aloud which emphasized...

McKenzie, Dan

2007-05-18T23:59:59.000Z

140

Transitioning Kentucky Off Oil: An Interview with Clean Cities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell...

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Term Contract Listing TC Number Commodity/Service TC Number Commodity/Service  

E-Print Network (OSTI)

/Microwave Replacement Units 889 Air Charter for Football 867 Moving Services, Household/Commercial 890 Air Charter) 420 Animals, Laboratory 415 Pall Corporation Proprietary Products 820 Asbestos Abatement (Hazardous) Consulting 525 Paper, Fine, Duplicating, Print 815 Asbestos and Lead Abatement, Full Service 515 Parking

Papautsky, Ian

142

DOE Awards Support Service Contract  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati - The U.S. Department of Energy (DOE) today announced the award of an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract to TerranearPMC, LLC, of Exton, Pennsylvania.

143

Environmental waste disposal contracts awarded  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental contracts awarded locally Environmental contracts awarded locally Environmental waste disposal contracts awarded locally Three small businesses with offices in Northern New Mexico awarded nuclear waste clean-up contracts. April 3, 2012 Worker moves drums of transuranic (TRU) waste at a staging area A worker stages drums of transuranic waste at Los Alamos National Laboratory's Technical Area 54. the Lap ships such drums to the U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) in Southern New Mexico. The Lab annually averages about 120 shipments of TRU waste to WIPP. Contact Small Business Office (505) 667-4419 Email "They will be valuable partners in the Lab's ability to dispose of the waste safely and efficiently." Small businesses selected for environmental work at LANL

144

WHAT'S NEW FOR CONTRACTING OFFICERS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

any audit services for each proposal considered for award in a competition for a cost-reimbursement contract expected to exceed 1,000,000. The waiver request must document...

145

Contracts as a Risk Management Tool  

E-Print Network (OSTI)

About one-third of the total value of U.S. agricultural production is produced under contract arrangements. This publication explains marketing and production contracts, and gives specific detail about contracts in swine production and in the broiler industry.

Hall, Charles R.; Langemeier, Larry N.

1999-04-15T23:59:59.000Z

146

Chapter 43 - Contract Modifications | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 43 - Contract Modifications 43.1 Contract Modification.pdf AcqGuide43.2 1 August 2013CLEAN.pdf 43.3Maintaining Alignment of Project Mgmt with Contract Mgmt.pdf...

147

WIC Contract Spillover Effects Jeffrey M. Perloff**  

E-Print Network (OSTI)

the contract changed. #12;24 Table 2. Multinomial Logit for States with a Contract Change Linear Time Trend Log Brand Market Share Logit for All States Linear Time Trend Log-Linear Time Trend Time Dummies Contract

Perloff, Jeffrey M.

148

DOE O 541.1B, Appointment of Contracting Officers and Contracting Officer Representatives  

Directives, Delegations, and Requirements

The Order established procedures governing the selection, appointment and termination of Department of Energy contracting officers and contracting officer ...

2004-04-21T23:59:59.000Z

149

Exploring Ways to Standardize Federal Energy Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exploring Ways to Standardize Exploring Ways to Standardize Federal Energy Contracts May 23, 2013 Chandra Shah for Tracy J. Logan Program Analyst Federal Energy Management Program Office of Energy Efficiency and Renewable Energy U.S. Department of Energy Energy Lawyers and Contracting Officers Working Group 2 Vision Evolution toward standardization of cross-sector and cross-project terms, conditions, reporting methodologies, financial calculations and contract structure to improve transparency and replicability of performance contracts. * Adoption of the Federal Uniform Performance Contract increases transparency and reduces transaction costs. * Technical and financial data and specifications are presented in a clear, predictable manner from contract to contract. * Federal Contracting Officers

150

NEPA Contracting Reform Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracting Reform Guidance Contracting Reform Guidance NEPA Contracting Reform Guidance This documents provides guidance on NEPA contracting strategy, including: defining the work of the contractor; establishing contracts ahead of time; minimizing cost while maintaining quality. Guidance also provides: model statements of work, direction on NEPA contract management by NEPA Document Manager; a system for measuring NEPA costs and for evaluating contractor procedures; details on the DOE NEPA website. NEPA Contracting Reform Guidance More Documents & Publications NEPA Contracting Reform Guidance (December 1996) Statement of Work-National Environmental Policy Act (NEPA) Support Services Acquisition: Preparation and Review of Environmental Impact Statements, Environmental Assessments, Environmental Reports, and other Environmental

151

UESC Contracting Officer Issues Round-Up  

Energy.gov (U.S. Department of Energy (DOE))

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses issues contracting officers often face with utility energy service contracts (UESCs).

152

NEPA Contracting Reform Guidance (December 1996) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1996) This guidance provides: model statements of work, information on contract types and incentives, direction on effective NEPA contract management by the NEPA Document...

153

QA Standard Contract Language | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standard Contract Language QA Standard Contract Language The success of the Office of Environmental Management (EM) depends upon the extent of its products and services to satisfy...

154

Energy Savings Performance Contracts Summary | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home Energy Savings Performance Contracts Summary Energy Savings Performance Contracts Summary...

155

Financing for Utility Energy Service Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Financing for Utility Energy Service Contracts Financing for Utility Energy Service Contracts Financing for Utility Energy Service Contracts October 7, 2013 - 2:21pm Addthis Financing is a significant portion of utility energy service contract (UESC) costs. Experience shows several things the Federal Government can do to get the best value by reducing UESC financial transaction costs and interest. Interest Rates Interest rates are based on the sum of an index rate on the date the transaction is signed and a "premium" or "adders" usually measured in basis points where 100 basis points is equal to 1%. The premium reflects the costs of obtaining the financing under prevailing market conditions, financial risk, transaction costs, and profit for the finance company. The cost of financing varies depending upon a number of factors. Optimizing

156

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$ 3,422,994.00 $ 3,422,994.00 FY2011 4,445,142.00 $ FY2012 $ 5,021,951.68 FY2013 $ 3,501,670.00 FY2014 $0 FY2015 $0 FY2016 $0 FY2017 $0 FY2018 $0 FY2019 $0 Cumulative Fee Paid $16,391,758 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee $989,000,000 Contract Period: Contract Type: January 2010 - December 2019 Contract Number: EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name: Comprehensive Security Services September 2013 Fee Information Maximum Fee $55,541,496 $5,204,095 $3,667,493 $5,041,415 Minimum Fee 0 Fee Available $5,428,947 $6,326,114

157

Using Other Agencies' Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Using Other Agencies' Contracts Using Other Agencies' Contracts Using Other Agencies' Contracts The Department of Energy's (DOE) use of other agencies contracts has increased in recent years. Other agency contracts include Economy Act interagency agreements, Franchise Fund Organizations, Federal Supply Schedule (FSS) and Government-Wide Acquisition Contracts (GWAC). These contracts, where used appropriately, provide DOE with effective vehicles to meet its contract requirements. To take full advantage of benefits that these contracts offer, DOE contracting professionals must ensure that the use of these contracts are in DOE's best interests, meet DOE's delivery, quality and cost requirements, and comply with applicable laws, regulations, and policies. GSA's "Get It Right" campaign has raised the visibility and interest in the

158

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

SOLICITATIONIMODIFICATION OF CONTRACT I '. SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

159

EOTA Support Services Contract Acquisition  

NLE Websites -- All DOE Office Websites (Extended Search)

Emergency Operations Training Academy (EOTA) Support Services Contract Emergency Operations Training Academy (EOTA) Support Services Contract Acquisition Welcome to the EOTA Support Services Contract Acquisition page. The U.S. Department of Energy National Nuclear Security Administration, EOTA requires support services to implement a comprehensive professional training development program to NNSA HQs and site office personnel. EOTA's training center located in Albuquerque, NM develop, coordinates, delivers, and certifies related emergency operations/management training at other NNSA site Offices located through out the country. EOTA ensures the effective and efficient training of emergency operations personnel throughout the DOE who are or may become involved in the planning, preparedness, and response of vital national resources. The EOTA provides

160

Program Management for Contracting Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Government Contracting - Government Contracting - A Project Manager's Perspective ???!!! Presented by John Baniszewski, Deputy Project Manager and Former Procurement Manager, NASA Goddard Space Flight Center 2 Project Managers and Contracting Officers: The Need to Understand Each Other * "I can't understand it. I can't even understand the people who can understand it" - Queen Juliana of the Netherlands * "Seek first to understand, and then to be understood" - Stephen Covey * "If one does not understand a person, one tends to regard him as a fool" - Carl Jung * "Before you contradict an old man, my fair friend, you should endeavor to understand him" - George Santayana 3 Project Managers and Procurement * "A Guide to the Project Management Body of

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

II.CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

1 1 II.CONTRACT ID CODE ~AGE 1 of AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT PAGES AC 5. PROJECT NO. (If applicable) 3. EFFECTNE DATE 2. AMENDMENTfMODIFICA TION NO. 4. REQUISITIONIPURCHASE REQ. NO. See Block 16c. NOPR 7. ADMINISTERED BY (If other than Item 6) CODE 05008 6. ISSUED BY CODE 05008 U.S. Department of Energy National Nuclear Security Administration U.S. Department of Energy National Nuclear Security Administration P.O. Box 2050 Oak Ridge, TN 37831 P.O. Box 2050 Oak Ridge, TN 37831 9A. AMENDMENT OF SOLICITATION NO. 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Y-12, LLC P.O. Box 2009 MS 8014 9B. DATED (SEE ITEM 11) Oak Ridge, TN 37831-8014 lOA. MODIFICATION OF CONTRACT/ORDER NO.

162

Stakeholder Engagement and Outreach: Perspectives: Personal Interviews With  

Wind Powering America (EERE)

Perspectives: Perspectives: Personal Interviews With Wind Industry Stakeholders, Pioneers, Advocates, and Electric Cooperatives Wind Powering America interviewed various industry stakeholders to show different perspectives of wind energy's value. Wind Powering America also interviewed wind pioneers to examine how they have laid the groundwork for today's U.S. wind energy market. These interviews are one of a kind and provide an insider view of how the wind industry has evolved and is influenced today. Wind Powering America is also interviewing Native Americans to examine their experiences and future plans. Finally, included, are wind power advocate interviews, electric cooperative interviews, and public power pioneer interviews. Public Power Wind Pioneer Interviews Photo of Patricia Bigner and Phil Dougherty

163

Microsoft Word - DRAFT CRB Interview Guidance.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certification Review Board Interview Guidance Certification Review Board Interview Guidance 1 Background and Scope: The Certification Review Board (CRB) conducts interviews for Level 3 and 4 certification candidates, unless otherwise waived by the CRB (see Appendix C of the March, 2009 PMCDP Certification and Equivalency Guidelines ). These interviews allow aspiring Level 3 and 4 federal project directors to demonstrate verbally their mastery of the requisite leadership expertise, to include the expert management of project resources and accountability for project successes and failures, needed to manage high-dollar, mission-critical DOE projects effectively. Interview Structure and Process: Candidate interviews are conducted after the certification candidate's profile has been provisionally

164

Financing Solar Energy Systems with Energy Savings Performance Contracts in the Federal Sector: Results of a Survey on Barriers  

DOE Green Energy (OSTI)

This report summarizes the findings of an investigation into financing solar energy systems for the Federal sector. The objectives of the investigation were (1) to identify the barriers that impede companies from using Energy Savings Performance Contracts (ESPCs) to develop solar energy projects for Federal facilities, and (2) to clarify the impacts of Federal contracting requirements on energy service companies' use of ESPCs. Twenty-four representatives of energy service companies agreed to be interviewed. Their responses indicate that these are the primary barriers to greater use of ESPCs: the relatively long payback periods for investments in solar technologies; the length of the ESPC process; the cost of certain contractual requirements regarding wages and financing; and a lack of knowledge about the actual cost and reliability of solar systems. The report proposes a number of actions the government could take to remove these barriers, including (1) streamlining and shortening the ESPC process and (2) doing more to inform both government agencies and energy service companies about the costs and benefits of solar systems.

Gee, R. C.; LaPorta, C.

1999-08-17T23:59:59.000Z

165

An Interview with Chris Gunderson: Are Militaries Lagging Their Non-State Enemies in Use of Internet?  

Science Conference Proceedings (OSTI)

The increasing number of cyber attacks on military networks and servers has raised the question of what the global defense community is doing to safeguard military systems and protect the larger global Internet. Ubiquity's editor interviewed Chris Gunderson, ...

Peter Denning

2009-10-01T23:59:59.000Z

166

SunShot Initiative: Financing and Contracting  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing and Contracting to Financing and Contracting to someone by E-mail Share SunShot Initiative: Financing and Contracting on Facebook Tweet about SunShot Initiative: Financing and Contracting on Twitter Bookmark SunShot Initiative: Financing and Contracting on Google Bookmark SunShot Initiative: Financing and Contracting on Delicious Rank SunShot Initiative: Financing and Contracting on Digg Find More places to share SunShot Initiative: Financing and Contracting on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Financing and Contracting Photo of two males with safety gear mounting a rectagular-shaped solar panel on a roof. Requiring only a fraction of the initial investment associated with

167

Chapter 52.1, Local Contract Clauses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2.1, Local Contract Clauses 2.1, Local Contract Clauses [Reference: FAR 52, DEAR 952] Overview This section addresses the use of local clauses in DOE solicitations and contracts, and provides model local clauses that Contracting Officers may use when drafting their contracts. Background A local clause is a solicitation provision or contract clause that is not prescribed by either the FAR or the DEAR and is developed by a local DOE office for use in solicitations issued and contracts awarded by that office. Local clauses can be used for the following kinds of subject matter: Administrative contract issues. Local DOE site practices and procedures that affect the contract. Local DOE office solicitation procedures. Practices and procedures that implement FAR and DEAR policies.

168

JOB NUMBER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . . . . . . . . .: LEAVE BLANK (NARA use only) JOB NUMBER N/-&*W- 9d - 3 DATE RECEIVED " -1s - 9 J - NOTIFICATION TOAGENCY , In accordance with the provisions of 44 U.S.C. 3303a the disposition request. including amendments, is ap roved except , . l for items that may be marke,, ,"dis osition not approved" or "withdrawn in c o i m n 10. 4. NAME OF PERSON WITH WHOM TO CONFER 5 TELEPHONE Jannie Kindred (202) 5&-333 5 - 2 -96 6 AGENCYCERTIFICATION -. ~ - I hereby certify that I am authorized to act for this agency in matters pertaining to the disposition of its records and that the records roposed for disposal are not now needed for the business of this agency or wiRnot be needed after t G t r & s s d ; and that written concurrence from

169

Case Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Name of Petitioner: Name of Petitioner: Date of Filing: Case Number: Department of Energy Washington, DC 20585 JUL 2 2 2009 DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Appeal Dean P. Dennis March 2, 2009 TBA-0072 Dean D. Dennis filed a complaint of retaliation under the Department of Energy (DOE) Contractor Employee Protection Program, 10 C.F.R. Part 708. Mr. Dennis alleged that he engaged in protected activity and that his employer, National Security Technologies, LLC (NSTec ), subsequently terminated him. An Office of Hearings and Appeals (OHA) Hearing Officer denied relief in Dean P. Dennis, Case No. TBH-0072, 1 and Mr. Dennis filed the instant appeal. As discussed below, the appeal is denied. I. Background The DOE established its Contractor Employee Protection Program to "safeguard public

170

KPA Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supports CMM-SW Level 3 Supports CMM-SW Level 3 Mapping of the DOE Information Systems Engineering Methodology to the Software Engineering Institute (SEI) Software Capability Maturity Model (CMM-SW) level 3. Date: September 2002 Page 1 KPA Number KPA Activity SEM Section SEM Work Product SQSE Web site http://cio.doe.gov/sqse ORGANIZATION PROCESS FOCUS OPF-1 The software process is assessed periodically, and action plans are developed to address the assessment findings. Chapter 1 * Organizational Process Management * Process Improvement Action Plan * Methodologies ! DOE Methodologies ! SEM OPF-2 The organization develops and maintains a plan for its software process development and improvement activities. Chapter 1 * Organizational Process Management * Process Improvement

171

Solar Industry At Work: Video Interview with Alta Devices' Laila...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos Solar Industry At Work: Video Interview with Alta Devices' Laila Mattos June 6, 2012 - 12:07pm Addthis Laila...

172

Contracting for Support Services | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance Guidance » Contracting for Support Services Contracting for Support Services What you need to know as a Federal Employee The Department of Energy, like most Federal agencies, spends a significant amount of its contracting budget on support services. While these contracts fulfill continuing and essential needs of the Department, this type of contracting arrangement can present unique situations that require special diligence on the part of Federal employees to ensure that applicable statutes, regulations, and management practices are followed. Contracts for support services cover a wide range of areas and may include: - Maintenance, overhaul, repair and servicing of equipment. - Housekeeping services. - Advisory and assistance services. - Transportation services.

173

FY 2010 Service Contract Inventory Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Service Contract Inventory Analysis 0 Service Contract Inventory Analysis Department of Energy Office of Procurement & Assistance Management Strategic Programs Division (MA-622) January 2012 (REVISED) FY2010 Service Contract Inventory Analysis Department of Energy Contents Page Section 1: Background 1 Section 2: Analysis and Findings 3 Section 3: Next Steps 5 FY2010 Service Contract Inventory Analysis Department of Energy 1 Section 1: Background Section 743 of Division C of the FY 2010 Consolidated Appropriations Act, P.L. 111-117, requires civilian agencies to prepare an annual inventory of their service contracts. The Office of Management and Budget's (OMB) November 5, 2010 and December 19, 2012 Memorandums entitled, "Service Contract

174

Standard Contracts Team | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Standard Contracts Team Standard Contracts Team Standard Contracts Team The Standard Contracts Team has responsibility to: Act as Federal contracting officer for contracts with the nuclear power utilities; Evaluate materials related to the on-going Applications for Allowable and Reasonable Costs (claims) pursuant to settlement agreements; Support proposed settlement discussions and litigation preparation and court proceedings for the Deputy General Counsel for Environment and Nuclear Programs and Department of Justice; Prepare responses to correspondence regarding Nuclear Waste Policy Act issues raised by congressional, Inspector General, Government Accountability Office and Freedom of Information Act enquiries; and Collect, verify, track and assess the annual fees paid by nuclear

175

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

1. 1. CONTRACT 10 CODE PAGE 1 OF 2 PAGES 2. AMENDMENT/MODIFICATION NO. 13. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If applicable) M058 See Block 16 C 6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Los Alamos Site Office 3747 West Jemez Road, Building 1410, TA-3 Los Alamos, NM 87544 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 9A. AMENDMENT OF SOLICITATION NO. Los Alamos National Security, LLC 4200 West Jemez Road 9B. DATED (SEE ITEM 11) Suite 400 Los Alamos, NM 87544 10A. MODIFICATION OF CONTRACT/ORDER NO. DE-AC52-06NA25396 CODE FACILITY CODE 10B. DATED (SEE ITEM 13) December 21, 2005 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS o The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt

176

Utility Energy Savings Contract Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Energy Savings Utility Energy Savings Contract Project Redstone Arsenal, Alabama Presented by Doug Dixon, Pacific Northwest National Laboratory For Mark D. Smith, PE, CEM, CEA Energy Manager, Redstone Arsenal Federal Utility Partnership Working Group - Fall 2010 UNCLASSIFIED UNCLASSIFIED 0 50 100 150 200 250 Klbs FY09 Total Hourly Steam FY09 Total Threshold $22.76 / MMBTU (Minimum take-or-pay base rate) (Consumer Price Index) Average FY09 Natural Gas Price $5.52 / MMBTU $16.91 / MMBTU (High capacity rate) (Petroleum Price Index) Hours UNCLASSIFIED Resolution * Manage the steam load to the minimum take-or- pay thresholds under the existing contract.  Prune the distribution system by eliminating long runs with low density and high thermal losses.  Ensure summer steam loads are utilized.

177

Audit of Department of Energy Support Service Contracting, CR-B-95-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL AUDIT OF DEPARTMENT OF ENERGY SUPPORT SERVICE CONTRACTING Report Number: Capital Regional Audit Office Date of Issue: Germantown, MD 20874 REPORT NO. U.S. DEPARTMENT OF ENERGY RELEASE DATE OFFICE OF INSPECTOR GENERAL CR-B-95-06 JUNE 30, 1995 _________________________________________________________________ _______________________ AUDIT OF DEPARTMENT OF ENERGY SUPPORT SERVICE CONTRACTING

178

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89  

SciTech Connect

Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

NONE

1998-04-01T23:59:59.000Z

179

Optimal Sequencing of Individually Rational Contracts  

E-Print Network (OSTI)

Multiagent researchers have worked on the problem of determining optimal contracts between self-interested agents. In particular, Sandholm et al. [1, 8] have both theoretically and experimentally studied the necessity and usefulness of di#erent contract types under the assumption of individually myopically rational contracting. We study a variant of sequential contracting where the goal is to maximize social welfare through a fixed-length sequence of individually rational contracts. The space of possible contract sequences is exponential. We compare a greedy deterministic heuristic with a stochastic genetic algorithm based approach for this optimal sequential contract selection problem. We focus on sub-additive domains where individually rational contracts are feasible with side payments. We show that the GAbased approach consistently outperforms the deterministic heuristic by generating larger social welfare.

Partha Sarathi Dutta; Sandip Sen

2002-01-01T23:59:59.000Z

180

MEMORANDUM TO HEADS O F CONTRACTING ACTIVITIES AND PROCUREMENT DIRECTORS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 2010 MEMORANDUM TO HEADS O F CONTRACTING ACTIVITIES AND PROCUREMENT DIRECTORS FROM: DIRECTOR OFFICE OF CONTRACT MANAGEMENT SUBJECT: Establishment of Requirement for Monthly Status Reporting on Source Evaluation Boards (SEBs) Valued in Excess of $25 Million As everyone is aware, DOE accomplishes the majority of its work through its various contracts. In recent years, the Department has drawn increased scrutiny from a number of different sources. As a result, the procurement process receives a tremendous amount of visibility among senior DOE management, particularly our largest and most critical procurements which are conducted by SEBs. This highlights the critical need for SEB reporting and tracking. At the Procurement Directors meeting held in December 2009, it was mentioned during

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Natural gas contracts in an emerging competitive market  

SciTech Connect

Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

Sutherland, R.J.

1992-11-01T23:59:59.000Z

182

Natural gas contracts in an emerging competitive market  

SciTech Connect

Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

Sutherland, R.J.

1992-01-01T23:59:59.000Z

183

Before the House Small Business Subcommittee on Contracting and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subcommittee on Contracting and Technology Before the House Small Business Subcommittee on Contracting and Technology Before the House Small Business Subcommittee on Contracting...

184

Renewable Energy RFPs: Solicitation Response and Wind Contract Prices  

E-Print Network (OSTI)

Power Contract Costs Renewable energy contract costs are notfor recent renewable energy contracts costs in markets withrenewable energy solicitations; and 2. Wind power purchase costs

Wiser, Ryan; Bolinger, Mark

2005-01-01T23:59:59.000Z

185

DOE Site Facility Management Contracts Internet Posting | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting DOE-NNSA Site Facility Mgmt Contracts AUG 2013.pdf More Documents &...

186

Federal Energy Management Program: Utility Contract Buydown and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Approaches on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts Types of Contracts Laws & Regulations Getting the Best Value...

187

Chapter 16 - Types of Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 - Types of Contracts Chapter 16 - Types of Contracts 16.2 - Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts...

188

Federal Energy Management Program: Utility Energy Service Contract...  

NLE Websites -- All DOE Office Websites (Extended Search)

Meetings on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts Types of Contracts Laws & Regulations Getting the Best Value...

189

Contacts for the Office of Standard Contract Management | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Standard Contract Management Contacts for the Office of Standard Contract Management Leadership Contact Us David K. Zabransky, Director, Office of Standard Contract Management...

190

Standard Contract Amendment for New Reactors | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amendment for New Reactors Standard Contract Amendment for New Reactors The following document is a contract amendment to a standard contract between the United States of America,...

191

Contracting for Support Services | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracting for Support Services Contracting for Support Services Contracting for Support Services What you need to know as a Federal Employee The Department of Energy, like most Federal agencies, spends a significant amount of its contracting budget on support services. While these contracts fulfill continuing and essential needs of the Department, this type of contracting arrangement can present unique situations that require special diligence on the part of Federal employees to ensure that applicable statutes, regulations, and management practices are followed. Contracts for support services cover a wide range of areas and may include: Maintenance, overhaul, repair and servicing of equipment. Housekeeping services. Advisory and assistance services. Transportation services. Recurring maintenance of real property.

192

National Contract Management Association's 2013 World Congress |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Contract Management Association's 2013 World Congress National Contract Management Association's 2013 World Congress National Contract Management Association's 2013 World Congress July 21, 2013 9:15AM EDT to July 24, 2013 5:15PM EDT Nashville, TN The National Contract Management Association (NCMA) will hold its 2013 World Congress from July 21 to July 24, 2013, in Nashville, TN. The theme for this conference is "Collaborative Contract Management Training: Embracing Change in a Dynamic Environment," and the agenda supports the development and ability of contract management professionals to make sound business decisions. NCMA's 2013 World Congress qualifies as training in compliance with 5 U.S.C. Chapter 41. The training is open to all Federal employees and will feature training and workshops in areas such as Contract Negotiations,

193

Green Purchasing under DOE Architect Engineer Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Purchasing under DOE Architect Engineer Contracts Purchasing under DOE Architect Engineer Contracts Prescription for Use: This clause should be used in any architect-engineer type contract unless Leadership in Energy and Environmental Design (LEED) Green Building Certification is being pursued. In case of LEED Certification, a detailed series of energy and environmental standards would take the place of this clause. Section I of the contract should also contain the clauses at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy Consuming Products, and 52.223-17 Affirmative Procurement of EPA- Designated Items in Service and Construction Contracts. H-xx. Green Purchasing under DOE Architect Engineer Contracts

194

NREL: Wind Research - New England Interview: Stephan Wollenburg...  

NLE Websites -- All DOE Office Websites (Extended Search)

Interview: Stephan Wollenburg, Green Energy Program Director of Energy Consumers Alliance of New England January 14, 2013 The Energy Consumers Alliance of New England (ECANE)...

195

Segment of Smithsonian Video history interview - December 1987  

NLE Websites -- All DOE Office Websites (Extended Search)

1 In 1987, Stanley Goldberg, consulting historian for the Smithsonian's National Museum of American History conducted interviews in the Kennedy Maxwell Productions Studio located...

196

Employee Exit Interviews--An Important But Frequently Overlooked ...  

Science Conference Proceedings (OSTI)

... and efficiently administered exit interview program can go a long way toward ... If the employer has agreed to waive its rights in any invention and no prior...

197

Federal Energy Management Program: Utility Energy Service Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracts to someone by E-mail Contracts to someone by E-mail Share Federal Energy Management Program: Utility Energy Service Contracts on Facebook Tweet about Federal Energy Management Program: Utility Energy Service Contracts on Twitter Bookmark Federal Energy Management Program: Utility Energy Service Contracts on Google Bookmark Federal Energy Management Program: Utility Energy Service Contracts on Delicious Rank Federal Energy Management Program: Utility Energy Service Contracts on Digg Find More places to share Federal Energy Management Program: Utility Energy Service Contracts on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts Types of Contracts Laws & Regulations Best Practices Federal Utility Partnership Working Group Partnership Meetings

198

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

PAGE OF PAGES PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT 1 I 2 2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4 . REOUISITIONIPURCHASE REO NO . 5 PROJECT NO. (II applicable) 213 6. ISSUED BY CODE 07/ 01 / 2010 05008 7. ADMINISTERED BY (llolherlhan lIem 6) 1 CODE 105008 NNSA/ Oakridge Site Office U.S. Department of Energy NNSA / Y-12 Site Office P.O . Box 2050 Building 9704-2 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No .* streel. counly. Slale and ZIP Code) NNSA/Oakridge Site Office U.S. Department of Energy NNSA/Y-12 Site Office P .O . Box 2050 Building 9704-2 Oak Ridge TN 37831 (X) SA. AMENDMENT OF SOLICITATION NO. -- ABC OCK & WILCOX TECHNI CAL ttn: WILLIE J. WILS ON o BOX 2 009 B A P SERVICES Y-12, LLC SB . DATED (SEE/TEM 11)

199

STATE OF UTAH CONTRACT NUMBER: AR2056 16 PAGES Contract last updated on 2/1/2011  

E-Print Network (OSTI)

not include staples or paper supplies) Cost Per Copy (No monthly minimum) Value Added Maintenance Service staple or paper supplies) 45 day warranty with toner #12;State Of Utah Digital Black & White Copier labor, parts & toner does not include staple or paper supplies) 45 day warranty with toner BLACK & WHITE

Capecchi, Mario R.

200

Glossary Term - Atomic Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Particle Previous Term (Alpha Particle) Glossary Main Index Next Term (Avogadro's Number) Avogadro's Number Atomic Number Silver's atomic number is 47 The atomic number is equal to...

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

JGI - CSP Review Process & Contract Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Process and Contract Documents CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Review Process Full proposals will go...

202

NEPA Contracting Reform Guidance (December 1996)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

defining early what contractors should accomplish defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by * maximizing competition and use of incentives * using past performance information in awarding work * managing the NEPA process as a project This guidance provides: < model statements of work < information on contract types and incentives < direction on effective NEPA contract management by the NEPA Document Manager < a system for measuring NEPA process costs < NEPA contractor evaluation procedures < details on the DOE NEPA Web site U.S. Department of Energy, Office of NEPA Policy and Assistance, December 1996 NEPA CONTRACTING REFORM GUIDANCE Table of Contents 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . .

203

Emerging Technologies for Energy Savings Performance Contracting...  

NLE Websites -- All DOE Office Websites (Extended Search)

Emerging Technologies for Energy Savings Performance Contracting in the Federal Sector A report by the Alliance to Save Energy to the US DOE Federal Energy Management Program...

204

MODELING OF FORWARD CONTRACTS IN ELECTRICITY MARKETS.  

E-Print Network (OSTI)

??Since the deregulation of electricity, new models were needed to quantify the price of contracts with speci ed delivery period of electricity. In this thesis (more)

Fjeldskr, Hanne

2009-01-01T23:59:59.000Z

205

Power Marketing and Contracts in RM  

NLE Websites -- All DOE Office Websites (Extended Search)

a variety of services for its customers and the utility industry, including long term power purchases, transmission contracts, facility arrangements and maintenance services....

206

Energy Savings Performance Contracts (ESPCs) (Fact Sheet)  

Science Conference Proceedings (OSTI)

Overview of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) energy savings performance contract (ESPC) program.

Not Available

2012-09-01T23:59:59.000Z

207

Energy Savings Performance Contracts (ESPCs) (Fact Sheet)  

SciTech Connect

Overview of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) energy savings performance contract (ESPC) program.

Not Available

2011-07-01T23:59:59.000Z

208

ENERGY STAR Performance Contracting Best Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracting Best Practices Prepared for: U.S. Environmental Protection Agency ENERGY STAR Buildings Prepared by: ICF International National Association of Energy Services...

209

Transit and Contracts: What's Best for Drivers?  

E-Print Network (OSTI)

been provided by private companies. During the second halfare provided by private companies working under contract tointernational private companies. All private operations in

Kim, Songju; Wachs, Martin

2006-01-01T23:59:59.000Z

210

Contracts For Services (Tennessee) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracts For Services (Tennessee) Contracts For Services (Tennessee) Contracts For Services (Tennessee) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Tennessee Program Type Industry Recruitment/Support Provider Tennessee Regulatory Authority A corporation may contract with cities, towns, and villages, and with

211

INSPECTION OF ALLEGEDIMPROPRIETIES REGARDINGISSUANCE OF A CONTRACT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that the Department of Energy (DOE) improperly awarded a noncompetitive, multimillion-dollar contract to General Atomics through another contractor, AlliedSignal. The Office of...

212

USA RS Basic Contract - Contract No.: DE-RW0000005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USA RS Basic Contract - Contract No.: DE-RW0000005 USA RS Basic Contract - Contract No.: DE-RW0000005 USA RS Basic Contract - Contract No.: DE-RW0000005 This document describes the Statement of Work (SOW) of the Management and Operating Contractor (M&O) Contract for the U.S. Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) Program's Yucca Mountain Project (YMP). An M&O contract is defined at Federal Acquisition Regulation (FAR) 17.6 and Department of Energy Acquisition Regulation (DEAR) 970. Inasmuch as the assigned mission of OCRWM YMP is dynamic, this SOW is not intended to be exclusive or restrictive, but is intended to provide a broad framework and general scope of work to be performed by the M&O. This SOW does not represent a commitment to, or imply funding for, specific projects

213

Federal Energy Management Program: Utility Energy Service Contract Case  

NLE Websites -- All DOE Office Websites (Extended Search)

Utility Energy Utility Energy Service Contract Case Studies to someone by E-mail Share Federal Energy Management Program: Utility Energy Service Contract Case Studies on Facebook Tweet about Federal Energy Management Program: Utility Energy Service Contract Case Studies on Twitter Bookmark Federal Energy Management Program: Utility Energy Service Contract Case Studies on Google Bookmark Federal Energy Management Program: Utility Energy Service Contract Case Studies on Delicious Rank Federal Energy Management Program: Utility Energy Service Contract Case Studies on Digg Find More places to share Federal Energy Management Program: Utility Energy Service Contract Case Studies on AddThis.com... Energy Savings Performance Contracts ENABLE Utility Energy Service Contracts Types of Contracts

214

Microsoft Word - ContractManagementPlanningDRIVERS.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drivers for Ineffective and Effective Drivers for Ineffective and Effective Contract Management and Planning Ineffective Contract Management and Planning Effective Contract Management and Planning 1. Top management does not demonstrate a commitment to contract management planning. 2. Contract team members not clear on contract requirements. 3. Contract team members left out of planning process. 4. Lack of coordination and communication amongst the team members. 5. Contract team members not sure of roles, responsibilities, and limitations. 6. Contract team members not clear on how their responsibilities relate, or interact with, other team members. 1. Top management actively demonstrates a commitment to the contract management planning process. 2. Top management mandates training for the

215

Contracts for field projects and supporting research on enhanced oil recovery. Quarterly progress review No. 85, October 1, 1995--December 31, 1995  

SciTech Connect

This documents presents progress on enhanced oil recovery programs and reservoir characterization programs. Information is presented on contract numbers, awards, investigators, and project managers.

Godley, P.; Waisley, S.

1996-12-01T23:59:59.000Z

216

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994  

SciTech Connect

This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

NONE

1995-11-01T23:59:59.000Z

217

Exercising flexible load contracts: Two simple strategies  

Science Conference Proceedings (OSTI)

A flexible load contract is a type of swing option where the holder has the right to receive a given quantity of electricity within a specified period, at a fixed maximum effect (delivery rate). The contract is flexible, in the sense that delivery (the ... Keywords: energy, exercise strategy, flexibility, swing option, uncertainty

Petter Bjerksund; Bjarte Myksvoll; Gunnar Stensland

2008-03-01T23:59:59.000Z

218

Higher-order symbolic execution via contracts  

Science Conference Proceedings (OSTI)

We present a new approach to automated reasoning about higher-order programs by extending symbolic execution to use behavioral contracts as symbolic values, thus enabling symbolic approximation of higher-order behavior. Our approach is based on the idea ... Keywords: higher-order contracts, reduction semantics, symbolic execution

Sam Tobin-Hochstadt; David Van Horn

2012-11-01T23:59:59.000Z

219

DOE-BATTELLE PRIME CONTRACT MANAGEMENT & OPERATIONS  

E-Print Network (OSTI)

.2.1 Science Mission Role C ­ 4.2.2 National Security Mission Role C ­ 4.2.3 Energy Resources Mission Role C (HCA), Contracting Officer (CO), and Contracting Officer's Representative (COR) G ­ 2 952 Nuclear Materials H ­ 5 Workers' Compensation H ­ 6 Unemployment Compensation H ­ 7 Contractor Acceptance

220

Optimal sequencing of individually rational contracts  

Science Conference Proceedings (OSTI)

Multiagent researchers have worked on the problem of determining optimal contracts between self-interested agents. In particular, Sandholm et al. [1,8] have both theoretically and experimentally studied the necessity and usefulness of different ... Keywords: genetic algorithms, rational contracts

Partha Sarathi Dutta; Sandip Sen

2002-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

NLE Websites -- All DOE Office Websites (Extended Search)

1 of2 1 of2 AC PAGES 2. AMENDMENT/MODIFICATION NO. 13. EFFECTIVE DATE 4. REQUISITION/PURCHASE , 5. PROJECT NO (If applicab/e) A193 See Block 16C REQ. NO. NOPR 6. ISSUED BY CODE 7. ADMINISTERED BY (If other than /tern 6) CODE U.S. Department of Energy National Nuclear Security Administration P.O. Box 2050 Oak Ridge, TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Y-12, LLC P.O. Box 2009 MS 8014 Oak Ridge, TN 37831-8014 CODE FACILITY CODE 9A. AMENDMENT OF SOLICITATION NO. 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACT/ORDER NO. DE-AC05-000R22800 10B. DATED (SEE ITEM 13) August 31,2000 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS .. o The above numbered solicitation IS amended as set forth In Item 14. The hour and date specified for receipt of Offers 0

222

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

NLE Websites -- All DOE Office Websites (Extended Search)

15. PROJECT NO. (If applicable) 15. PROJECT NO. (If applicable) 213 See B':'ock 16C 10SC008480 6. ISSUED BY CODE 00518 7. ADMINISTERED BY (If other than lIem 6) CODE 100518 Oak Ridge Oak Ridge U.S. Department of Energy U.S. Department of Energy P.O. Box 2001 p.e. Box 2001 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No .. street. county. State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO. r-- o AK RIDGE ASSOCIATED UNIVERSITIES, INC. P.O. BOX 117 99. DATED (SEE ITEM 11) o AK RIDGE TN 37830-6218 X 10A. MODIFICATION OF CONTRACT/ORDER NO. DE-AC05-060R23100 10B. DATED (SEE ITEM 13) CODE 041152224 FACILITY CODE 12/21/2005 11. THIS ITEM ONLY APPLIES TO ' ... OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

223

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

NLE Websites -- All DOE Office Websites (Extended Search)

AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If app/icable) 331 See Block 16C 6. ISSUED BY CODE 00518 7. ADMINISTERED BY (If other than Item 6) CODE 100518 Oak Ridge Oak Ridge U.S. Department of Energy U.S. Department of Energy P.O. Box 2001 P.O. Box 2001 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No .. slreet, county, State and ZIP Code) (x) 9A. AMENDMENT OF SOLICITATION NO. - OAK RIDGE ASSOCIATED UNIVERSITIES, INC. P.O. BOX 117 9B. DATED (SEE ITEM 11) o AK RIDGE TN 37830-6218 x 10A. MODIFICATION OF CONTRACT/ORDER NO. DE-AC05-060R23100 108. DATED (SEE ITEM 13) CODE 041152224 FACILITY CODE 12/21/2005 11. THIS ITEM ONLY APPLIES TO OF IIU .... O:' The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers -

224

Grants & Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grants & Contracts Grants & Contracts Grants & Contracts Much of the work of the Department of Energy's Office of Science (SC) is supported through grants and contractual vehicles. This work is processed through the Office of Science Grants and Contracts Division (GCD) which serves as the principal acquisition, financial assistance (grants and cooperative agreements) and contract/grant management advisor to the Director of Science. The GCD provides independent analyses, advice and recommendations on procurement and assistance actions initiated by SC; identifies problem areas, opportunities and management issues and makes recommendations; serves as SC focal point in developing positions and responses to proposed Federal and DOE procurement and assistance regulations and business management policies and procedures; provides

225

Energy Savings Performance Contract Federal Financing Specialists |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Savings Performance Contract Federal Financing Specialists Energy Savings Performance Contract Federal Financing Specialists Energy Savings Performance Contract Federal Financing Specialists October 7, 2013 - 1:38pm Addthis The Federal Energy Management Program's Federal financing specialists (FFSs) help agencies launch energy savings performance contract (ESPC) projects. These specialists assist agencies by: Explaining performance contracting to site staff and management Determining whether a ESPC project is feasible Forming an agency acquisition team Determining agency project decision makers Partnering with energy service companies. Contact a FEMP FFS below to get started with an ESPC project. Contacts Name States Served Scott Wolf 360-866-9163 Serving: Montana, Wyoming, Utah, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Minnesota, New Mexico, Alaska, Washington, Oregon, Idaho, California, Nevada, Arizona, Hawaii, North Marianas, Palau, Guam, American Samoa Regions

226

Engineering, Procurement, and Construction Contracts and Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Engineering, Procurement, and Construction Contracts and Engineering, Procurement, and Construction Contracts and Performance Guarantees Engineering, Procurement, and Construction Contracts and Performance Guarantees October 16, 2013 - 5:03pm Addthis Engineering, procurement, and construction (EPC) contracts with long-term performance guarantees are becoming increasingly popular for some renewable energy technologies, such as commercial-scale photovoltaics systems. EPC contracts give the owner unprecedented assurance that the system will provide the long-term energy benefits advertised without wasting time and money with the architectural and engineering (A&E) firm or expensive change orders. These performance guarantees cover the entire installation and go way beyond manufacturer warranties that only cover specific parts and not

227

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.  

DOE Green Energy (OSTI)

This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

228

Microsoft Word - Contract Administration Long Testimony _FINAL_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement of Gregory H. Friedman Statement of Gregory H. Friedman Inspector General Department of Energy Before the Subcommittee on Government Management, Organization and Procurement of the Committee on Oversight and Government Reform U.S. House of Representatives FOR RELEASE ON DELIVERY 2:00 PM July 18, 2007 1 Mr. Chairman and members of the Subcommittee, I am pleased to be here today at your request to testify on issues pertaining to contract management at the Department of Energy. More than any other civilian agency in the Federal government, the Department of Energy places significant reliance on contractors. There are about 15,000 Federal employees at the Department. In contrast, there are approximately 100,000 contract employees plus a significant number of subcontract employees, who operate the

229

Tracking Santa: An Interview with the Head Researcher | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tracking Santa: An Interview with the Head Researcher Tracking Santa: An Interview with the Head Researcher Tracking Santa: An Interview with the Head Researcher December 23, 2010 - 11:12am Addthis Tracking Santa: An Interview with the Head Researcher Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs What does this mean for me? You'll be able to start monitoring St. Nick's journey starting at 6 AM ET on Christmas Eve. Every year since 1998, the Department of Energy's Los Alamos lab has been using state of the art technology to track Santa Claus as he circles the globe the night before Christmas. You'll be able to start monitoring St. Nick's journey here starting at 6 AM ET on Christmas Eve. This week, I got a chance to talk to Santa Tracker Head Researcher (and Cibola Flight Experiment Project Leader) Diane Roussel-Dupre to get a

230

Nuclear Engineering Division: interviews on Situation at Japan's nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

Interviews on Situation at Japan's Interviews on Situation at Japan's nuclear reactors Welcome Organization Visit Argonne Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Celebrating the 70th Anniversary of Chicago Pile 1 (CP-1) Argonne OutLoud on Nuclear Energy Argonne Energy Showcase 2012 Nuclear Engineering Division: interviews on Situation at Japan's nuclear reactors Bookmark and Share Fukushima Update "Fukushima and Chernobyl: Myth versus Reality" Fukushima and Chernobyl: Myth versus Reality Want to bypass the popular press myths and gain a true understanding of the radiation releases at Fukushima? Watch this video » Several experts from the Nuclear Engineering Division at Argonne National Laboratory have been interviewed on the situation at Japan's nuclear

231

Third Interview with Professor Peter Stein - 23 November 2007  

E-Print Network (OSTI)

Conversations with Professor Peter Gonville Stein Third Interview: Published Scholarly Works Date: 23 November 2007 Between July and November 2007 Professor Stein was interviewed three times at the Squire Law Library in the Faculty of Law... have been a competent politician There is still a lot of mystery about Vacarius#2;. I put forward the theory in this book that he gave lectures in Lincoln because Lincoln was quite near where he was a priest in charge at Southwell in Nottinghamshire#2...

Dingle, Lesley; Bates, Daniel

2008-05-14T23:59:59.000Z

232

PORTLAND STATE UNIVERSITY HOUSING 2010-2011 CONTRACT TERMS & CONDITIONS  

E-Print Network (OSTI)

PORTLAND STATE UNIVERSITY HOUSING 2010-2011 CONTRACT TERMS & CONDITIONS PAGE 1 OF 5 University TERMS & CONDITIONS 1) Term of Contract: This Contract is binding upon signature. All academic year not release Resident from the financial obligations of this Contract. ii) See Summer Contract for Summer term

Bertini, Robert L.

233

Techniques for Reducing High Risk Contracting Approaches  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reducing High Reducing High Risk Contracting Approaches Topics for Discussion Presidential Direction March 4, 2009 * Focus on transparency * Increase competition - It is the policy of the Federal Government that executive agencies shall not engage in noncompetitive contracts except in those circumstances where their use can be fully justified and where appropriate safeguards have been put in place to protect the taxpayer. * Improve competitive environment for the life of multiple award contracts * Reduce risk of cost growth/overcharging * Office of Management and Budget (OMB) Guidance to improve Government Acquisition , 29 July 2009 (implements President's direction) Why the Emphasis? * Reports by agency Inspectors General, the

234

Major Contract Solicitation | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Solicitation | National Nuclear Security Administration Solicitation | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Major Contract Solicitation Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitation Major Contract Solicitation Pantex Plant Wind Farm Acquisition Y-12 National Security Complex, Pantex Plant, with Option for

235

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTRACT ID CODE CONTRACT ID CODE Babcock & Wilcox Technical Services Pantex, LLC 9B. DATED (SEE ITEM 11) PO Box 30020 Amarillo, T X 79120 PAGE 1 OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I I DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 2. AMENDMENTIMODIFICATION NO. MI74 9A. AMENDMENT OF SOLICITATION NO. extended. CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

236

Glossary Term - Avogadro's Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Atomic Number Previous Term (Atomic Number) Glossary Main Index Next Term (Beta Decay) Beta Decay Avogadro's Number Avogadro's number is the number of particles in one mole of a...

237

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

No. DE-AC04-94AL85000 No. DE-AC04-94AL85000 Modification No. M344 Page 2 of 19 1. Section B, Clause B-2, Contract Type and Value is amended as follows: a. Paragraph (b) is revised as follows to set forth the Estimated Cost for FY 2010 and to reflect the Total Estimated Cost, exclusive of Contractor's Fees: Contract Period Estimated Cost October 1, 2009 through September 30, 2010 $ 2,549,525,767 October 1, 2010 through $ To be negotiated annually September 30, 2012 TOTAL through FY10 $31,589,840,857 b. Paragraph (c) is revised as follows to set the Fixed Fee for FY 2010 and to reflect the total Fixed Fee under the contract: Contract Period Fixed Fee October 1, 2009 through September 30, 2010 $ 18,040,617 October 1, 2010 through $ To be negotiated annually

238

GAO Protest to AMWTP Contract Withdrawn  

NLE Websites -- All DOE Office Websites (Extended Search)

EM News Flash Header GAO Protest to AMWTP Contract Withdrawn WASHINGTON, D.C. On July 29, 2011, CH2M Hill Newport News Nuclear, LLC, withdrew its protest of the award of the...

239

Chapter 32 - Contract Financing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 32 - Contract Financing 32.1ReviewingandApprovingInvoices2.pdf More Documents & Publications Policy Flash 2012-2 OPAM Policy Acquisition Guides Policy Flash 2012-14...

240

Essays on contract theory and behavioral economics  

E-Print Network (OSTI)

This thesis is a collection of essays on contract theory and behavioral economics. Chapter 1 proposes a model of choice under risk based on imperfect memory and self-deception. The model assumes that people have preferences ...

Gottlieb, Daniel, Ph. D. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Does Format of Pricing Contract Matter?  

E-Print Network (OSTI)

Working Paper No. XL05-002 Does Format of Pricing Contractquantity discount contract does not include a fixed fee andtariff. Also, division equivalence does not hold because the

Ho, Teck H; Zhang, Juanjuan

2004-01-01T23:59:59.000Z

242

Energy Savings Performance Contract Success Stories  

NLE Websites -- All DOE Office Websites (Extended Search)

transport the water 7 miles from the city to the base. Dyess also entered into an energy savings performance contract to add two 11-million-gallon holding reservoirs, two...

243

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15,763,807 Contractor: 93,591,118 Fee Available Contract Period: Contract Type: URSCH2M Oak Ridge, LLC (UCOR) DE-SC-0004645 April 29, 2011 - July 13, 2016 Contract...

244

Generalized Banach contraction in probabilistic metric/normed spaces  

E-Print Network (OSTI)

In this paper, we present the generalization of B-contraction and C-contraction due to Sehgal and Hicks respectively. We also study some properties of C-contraction in probabilistic metric space.

Lafuerza-Guillen, Bernardo

2007-01-01T23:59:59.000Z

245

Audit of Department of Energy Support Service Contracting, CR...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Support Service Contracting, CR-B-95-06 Audit of Department of Energy Support Service Contracting, CR-B-95-06 Audit of Department of Energy Support Service Contracting, CR-B-95-06...

246

DLA Energy: Your Supplemental Energy Contracting Venue  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP DEFENSE LOGISTICS AGENCY AMERICA'S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT DLA Energy Your Supplemental Energy Contracting Avenue Cynthia Obermeyer Contracting Officer DLA Energy April 2012 2 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

247

Help with gas contracts offered in manual  

Science Conference Proceedings (OSTI)

A loose-leaf manual published by the Federal Programs Advisory Service, provides information on natural gas contracts. The manual consists of four chapters which treat four basic types of gas contracts: sales for resale, direct sales, transportation agreements, and brokerage/reseller agreements. Each chapter includes sample clauses, analyses of selected issues (such as price, quantity, quality, and delivery conditions) and references to court and agency divisions.

John, D.; Hengerer, E. (eds.)

1984-01-01T23:59:59.000Z

248

GAO-05-274 Contract Management: Opportunities to Improve Surveillance on Department of Defense Service Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary of Defense Secretary of Defense March 2005 CONTRACT MANAGEMENT Opportunities to Improve Surveillance on Department of Defense Service Contracts GAO-05-274 What GAO Found United States Government Accountability Office Why GAO Did This Study Highlights Accountability Integrity Reliability www.gao.gov/cgi-bin/getrpt?GAO-05-274. To view the full product, including the scope and methodology, click on the link above. For more information, contact David E. Cooper at (617) 788-0555 or cooperd@gao.gov. Highlights of GAO-05-274, a report to the Secretary of Defense March 2005 CONTRACT MANAGEMENT Opportunities to Improve Surveillance on Department of Defense Service Contracts Surveillance varied on the 90 contracts we reviewed. Surveillance was insufficient on 26 of the contracts we reviewed but was sufficient on

249

Making contracting work better and cost less: Report of the Contract Reform Team  

Science Conference Proceedings (OSTI)

In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

Not Available

1994-02-01T23:59:59.000Z

250

Better Buildings Neighborhood Program: "Focus Series" Interviews  

NLE Websites -- All DOE Office Websites (Extended Search)

"Focus Series" "Focus Series" Interviews to someone by E-mail Share Better Buildings Neighborhood Program: "Focus Series" Interviews on Facebook Tweet about Better Buildings Neighborhood Program: "Focus Series" Interviews on Twitter Bookmark Better Buildings Neighborhood Program: "Focus Series" Interviews on Google Bookmark Better Buildings Neighborhood Program: "Focus Series" Interviews on Delicious Rank Better Buildings Neighborhood Program: "Focus Series" Interviews on Digg Find More places to share Better Buildings Neighborhood Program: "Focus Series" Interviews on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events "Focus Series" Interviews In December 2012, the Better Buildings Neighborhood Program launched the

251

Federal Energy Management Program: Energy Savings Performance Contract Case  

NLE Websites -- All DOE Office Websites (Extended Search)

Savings Savings Performance Contract Case Studies to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Facebook Tweet about Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Twitter Bookmark Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Google Bookmark Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Delicious Rank Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Digg Find More places to share Federal Energy Management Program: Energy Savings Performance Contract Case Studies on AddThis.com... Energy Savings Performance Contracts Assistance & Contacts

252

DOE Exercises 5 Year Option on Washington TRU Solutions Contract...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 -...

253

APDS licensee wins contract for nationwide biosensor network  

APDS licensee wins contract for nationwide biosensor network The DHS has awarded a contract to Northrop Grumman to begin phase 1 testing of the next

254

DOE Awards Small Business Contract for Technical Support to the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract for Technical Support to the Office of Environmental Management DOE Awards Small Business Contract for Technical Support to the Office of Environmental Management March...

255

DOE Awards Small Business Contract for Site Characterization...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Small Business Contract for Site Characterization and Erosion Control Work in Los Alamos, New Mexico DOE Awards Small Business Contract for Site Characterization and...

256

Statement by Secretary Bodman Regarding Alaskan Natural Gas Contract...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement by Secretary Bodman Regarding Alaskan Natural Gas Contract Statement by Secretary Bodman Regarding Alaskan Natural Gas Contract February 22, 2006 - 12:08pm Addthis...

257

EM, Industry Partner to Lay Out Opportunities to Improve Contract...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM, Industry Partner to Lay Out Opportunities to Improve Contract Performance Following Workshop EM, Industry Partner to Lay Out Opportunities to Improve Contract Performance...

258

Office of Standard Contract Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Contract Management manages the Standard Contracts for Disposal of Spent Nuclear Fuel andor High- Level Radioactive Waste between the Department and the nuclear industry...

259

Contract Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Management Argonne Site Office (ASO) ASO Home About ASO Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Argonne...

260

Department of Energy to Compete Management & Operating Contract...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Operating Contract for its National Renewable Energy Laboratory Department of Energy to Compete Management & Operating Contract for its National Renewable Energy...

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Contract Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Management Brookhaven Site Office (BHSO) BHSO Home About BHSO Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information...

262

Department of Energy to Compete Management and Operating Contracts...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management and Operating Contracts for Three Office of Science Laboratories Department of Energy to Compete Management and Operating Contracts for Three Office of Science...

263

DOE Awards Management and Operating Contract for DOE's Strategic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18, 2013...

264

Energy Department Awards Small Business Contract for Legacy Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Small Business Contract for Legacy Management Work to S.M. Stoller Corporation Energy Department Awards Small Business Contract for Legacy Management Work to S.M. Stoller...

265

Protective Force Contracts at the Oak Ridge Reservation, IG-0719...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Protective Force Contracts at the Oak Ridge Reservation, IG-0719 Protective Force Contracts at the Oak Ridge Reservation,...

266

BECHTEL JACOBS COMPANY LLC'S MANAGEMENT AND INTEGRATION CONTRACT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home BECHTEL JACOBS COMPANY LLC'S MANAGEMENT AND INTEGRATION CONTRACT AT OAK RIDGE, IG-0498 BECHTEL JACOBS COMPANY LLC'S MANAGEMENT AND INTEGRATION CONTRACT AT OAK...

267

Technical Services Contract Awarded for West Valley Demonstration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Services Contract Awarded for West Valley Demonstration Project Support Services Technical Services Contract Awarded for West Valley Demonstration Project Support...

268

Department of Energy (DOE) Energy Savings Performance Contract...  

NLE Websites -- All DOE Office Websites (Extended Search)

1.2 IDIQ FAQs ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) FREQUENTLY ASKED QUESTIONS (FAQs) 1. DOE's New IDIQ Contract Why did the...

269

New Online Marketplace for Small Business Contracting Launched...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

contracting process, making it simpler for small businesses to find and bid on low-dollar contracts from federal agencies. The new program allows the government to source...

270

Appendix A, Sample Register REGISTER XY CONTRACTING OFFICE Initiation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A, Sample Register A, Sample Register REGISTER XY CONTRACTING OFFICE Initiation Date Program Office Requisition Number Solicitation Number Business Instrument Number 08/30/2011 XX REQ- 11XX12345 DE-SOL- XX12345 DE- XY12345 Amendment/Modification REQ- 11XX12345.000 Modification 001 Amendment/Modification Amendment/Modification 11/30/2011 XX REQ- 12XX12346 DE-SOL- XX12346 DE- XY12346 Amendment/Modification REQ- 12XX12346.000 Modification 001 Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification Amendment/Modification

271

Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994  

Science Conference Proceedings (OSTI)

This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

NONE

1995-05-01T23:59:59.000Z

272

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE  

E-Print Network (OSTI)

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT Contract Number: #500 GAS PIPELINE ASSESSMENT #50010050 Legal Notice This information was prepared by Gas Technology;CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT #50010050 Task 3Summary Report AssessmentofCurrentlyAvailablePipeline

273

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE  

E-Print Network (OSTI)

GTI PROJECT NUMBER 21222 CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT Contract Number: #500 GAS PIPELINE ASSESSMENT #500-10-050 Legal Notice This information was prepared by Gas Technology;CALIFORNIA NATURAL GAS PIPELINE ASSESSMENT #500-10-050 Baseline Technology Assessment for Pipeline Integrity

274

Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transitioning Kentucky Off Oil: An Interview with Clean Cities Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell Transitioning Kentucky Off Oil: An Interview with Clean Cities Coordinator Melissa Howell June 18, 2013 - 4:12pm Addthis With the help of Kentucky Clean Fuels Coalition, Mammoth Cave National Park was the first National Park fleet to use 100 percent alternative fuel. The Global Electric Motorcar (pictured above) is used by park rangers who need to travel between the Mammoth Cave Campground and the Visitor Center area. | Photo courtesy of Victor Peek Photography. With the help of Kentucky Clean Fuels Coalition, Mammoth Cave National Park was the first National Park fleet to use 100 percent alternative fuel. The Global Electric Motorcar (pictured above) is used by park rangers who need

275

GUIDANCE TO COMPLETING THE SELF-DIRECTED RBSM INTERVIEW FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO COMPLETING THE SELF-DIRECTED RBSM TO COMPLETING THE SELF-DIRECTED RBSM INTERVIEW FORM The RBSM Process This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review process and provide the reviewer with some of the rationale behind the questions that are asked. This companion piece does not emulate the exact order of the review process interview form but rather, attempts to address the major pathways that may be followed along the way to selecting a given disposition category. The RBSM review process is outlined in a detailed flow chart which is subdivided into various sections. The first section of the flow chart initially identifies the activity to be evaluated. The remaining sections include a

276

Natural gas contracts in efficient portfolios  

Science Conference Proceedings (OSTI)

This report addresses the {open_quotes}contracts portfolio{close_quotes} issue of natural gas contracts in support of the Domestic Natural Gas and Oil Initiative (DGOI) published by the U.S. Department of Energy in 1994. The analysis is a result of a collaborative effort with the Public Service Commission of the State of Maryland to consider {open_quotes}reforms that enhance the industry`s competitiveness{close_quotes}. The initial focus of our collaborative effort was on gas purchasing and contract portfolios; however, it became apparent that efficient contracting to purchase and use gas requires a broader consideration of regulatory reform. Efficient portfolios are obtained when the holder of the portfolio is affected by and is responsible for the performance of the portfolio. Natural gas distribution companies may prefer a diversity of contracts, but the efficient use of gas requires that the local distribution company be held accountable for its own purchases. Ultimate customers are affected by their own portfolios, which they manage efficiently by making their own choices. The objectives of the DGOI, particularly the efficient use of gas, can be achieved when customers have access to suppliers of gas and energy services under an improved regulatory framework. The evolution of the natural gas market during the last 15 years is described to account for the changing preferences toward gas contracts. Long-term contracts for natural gas were prevalent before the early 1980s, primarily because gas producers had few options other than to sell to a single pipeline company, and this pipeline company, in turn, was the only seller to a gas distribution company.

Sutherland, R.J.

1994-12-01T23:59:59.000Z

277

42pt5ContractManagementPlanning.pdf | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ContractManagementPlanning.pdf More Documents & Publications Contract Management Plan Outline Chapter 16 - Types of Contracts Microsoft Word - ContractManagementPlanningDRIVERS.doc...

278

Contract Farming, Smallholders and Commercialization of Agriculture in Uganda: The Case of Sorghum, Sunflower, and Rice Contract Farming Schemes.  

E-Print Network (OSTI)

Rate of Adoption of Improved Sorghum Varieties in Easternand non contracted farmers Sorghum NCFs Total (n = 116) (n =in Uganda: The Case of Sorghum, Sunflower, and Rice Contract

Elepu, Gabriel; Nalukenge, Imelda

2009-01-01T23:59:59.000Z

279

Types of Utility Energy Service Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Types of Types of Utility Energy Service Contracts Types of Utility Energy Service Contracts October 7, 2013 - 2:17pm Addthis Several types of contracts are used as utility energy service contracts (UESCs). Many agency sites procure electricity services under a contract with the local utility, and most of these contracts have provisions that can also cover energy efficiency projects. Agencies not covered by such agreements may enter contracts with the utility for the sole purpose of implementing energy projects. Agency staff will want to first find out whether their facility is already covered under a UESC. Using an existing contract that is familiar to the agency and the utility is typically the most expeditious means of getting projects done. Areawide Contracts Areawide contracts (AWCs) are blanket contracts, which are essentially

280

Fourth Interview with Sir Eli Lauterpacht - 20 March 2008  

E-Print Network (OSTI)

://www.mefacts.com/cached.asp?x_id=11028 #2; See item 29, interview 2. #2; See item 29, interview 2. #2; 1915-2002. Born Aubrey Solomon Meir, Cape Town. Israeli diplomat and politician. Queens College Cambridge. #2; b. 1937, Leeds. UN Assistant Secretary General for Legal Affairs... , Leeds. UN Assistant Secretary General for Legal Affairs 1998-2005 See: http://www.lcil.cam.ac.uk/lectures/2007-08_ralph_zacklin.php 13 See: http://www.20essexst.com/bar/%20j_wood_m/wood_m.htm 14 Taba Tribunal (Egypt/Israel, 1986-1989): G...

Dingle, Lesley; Bates, Daniel

2008-06-19T23:59:59.000Z

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Utility Energy Services Contracts: Enabling Documents DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Energy Services Contracts: Enabling Documents 2008 Interim Update: Final Draft Prepared for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Federal Energy Management Program November 2008 DOE/GO-102008-2588 www.eere.energy.gov/femp Department of Energy Washington, D.C. Dear Colleagues, The U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) is pleased to present this third edition of Utility Energy Services Contracts: Enabling Documents. These documents provide a selected set of background information materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs). Since the first edition, UESCs have been used successfully to implement nearly $2 billion in

282

Site Acquisition Description/ Category Contracting Office Solicitation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acquisition Acquisition Description/ Category Contracting Office Solicitation Method Contract Type Estimated Dollar Range Pre-Solicitation Conference/ Industry Meetings Draft- Solicitation Synopsis Solicitation Receipt of Proposal Anticipated Evaluations Complete/Award Paducah GDP http://www.emcbc.doe.g ov/pgdp%20deactivatio n/ EMCBC Multiple award IDIQ contract holders Cost Plus Award Fee with Fixed Price clins $600M- $680M 5/1/2013 5/29/2013 N/A 8/9/2013 Jul-Sep 2013 Oct-Dec 2014 ETEC EMCBC Small Business Firm-Fixed Price & Fixed Unit Rate Price CLINS $25M-$40M 9/19/2013 Jul-Sep 2013 Oct-Dec 2013 Oct-Dec 2013 Jan-Mar 2014 Jul-Sep 2014 Lab Services EMCBC Small Business Fixed Price $40M-$60M Jan-Mar 2014 Jan-Mar 2014 Jan-Mar 2014 Apr-Jun 2014 Apr-Jun 2014 Jan-Mar 2015

283

DOE Awards WIPP Independent Oversight Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

Anne Wickham Anne Wickham (513) 246-0463) Dennis Hurtt (505) 234-7327 http://www.wipp.ws U.S. Department of Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 DOENews For Immediate Release DOE Awards WIPP Independent Oversight Contract Cincinnati, Ohio, October 7, 2005 - Today the U.S. Department of Energy (DOE) announced the award of the Waste Isolation Pilot Plant (WIPP) Independent Oversight contract to Pecos Management Services, Incorporated (Pecos) of Albuquerque, N.M. The contract is effective October 7, 2005, and contains a one year base with four one-year options. It is valued at approximately $4.5 million over the five-year period. Pecos has teamed with the Institute for Regulatory Science of Columbia, Md., to form the

284

Livermore Contract Announcement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Livermore Contract Announcement Livermore Contract Announcement Livermore Contract Announcement May 8, 2007 - 12:45pm Addthis Remarks as Prepared for Energy Secretary Samuel Bodman Good afternoon. Thank you all for coming and welcome to the Lawrence Livermore National Laboratory employees who are watching this on our Webcast. I know my remarks are of special importance to you. The Lawrence Livermore National Laboratory opened in 1952 using the "team science" approach pioneered by Ernest O. Lawrence. Livermore was - and is - a place where "new ideas" are dominant. Few would have predicted back then how deeply the work conducted at Lawrence Livermore would influence the course of history. And yet it has. Today is the 123rd anniversary of President Harry S Truman's birth. The first Cold War president, Truman's decisive

285

Laboratory awards final Recovery Act demolition contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act demolition contracts Recovery Act demolition contracts Laboratory awards final Recovery Act demolition contracts The two winning bidders will each demolish a portion of the remaining unused buildings at the Lab's historic Technical Area 21. April 20, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

286

GAO-06-838R Contract Management: DOD Vulnerabilities to Contracting Fraud, Waste, and Abuse  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accountability Office Accountability Office ington, DC 20548 Wash July 7, 2006 The Honorable John Warner Chairman The Honorable Carl Levin Ranking Member Committee on Armed Services United States Senate The Honorable Duncan Hunter Chairman The Honorable Ike Skelton Ranking Member Committee on Armed Services House of Representatives Subject: Contract Management: DOD Vulnerabilities to Contracting Fraud, Waste, and Abuse In recent years, the Department of Defense (DOD) has increasingly relied on goods and services provided by the private sector under contract. Since fiscal year 2000, DOD's contracting for goods and services has nearly doubled, and this trend is expected to continue. In fiscal year 2005 alone, DOD obligated nearly $270 billion on contracts for goods and services. Given the

287

LIVERMORE SITE OFFICE CONTRACT MANAGEMENT PLAN For LAWRENCE LIVERMORE NATIONAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LIVERMORE SITE OFFICE CONTRACT MANAGEMENT PLAN For LAWRENCE LIVERMORE NATIONAL LABORATORY CONTRACT NO. DE-AC52-07NA27344 LSO_CMP_6-10-088 i CONTENTS Contents 1. INTRODUCTION.............................................................................................................. 3 2. PURPOSE .......................................................................................................................... 3 2.2 Maintenance and Distribution ......................................................................................... 4 3. CONTRACT SUMMARY AND PRINCIPAL FEATURES............................................. 4 3.1 Contract Summary ...........................................................................................................

288

PORTLAND STATE UNIVERSITY HOUSING SUMMER 2011 CONTRACT TERMS & CONDITIONS  

E-Print Network (OSTI)

PORTLAND STATE UNIVERSITY HOUSING SUMMER 2011 CONTRACT TERMS & CONDITIONS PAGE 1 OF 5 University TERMS & CONDITIONS 1) Term of Contract: This Contract is binding upon signature. Failure to officially Session 2: July 16 ­ August 12, 2011 2) Definitions: For purposes of this Contract, the terms below have

Bertini, Robert L.

289

Quick Guide: Utility Energy Services Contracting (Fact Sheet)  

SciTech Connect

Summarized guide to conducting Federal energy management projects through utility energy services contracts.

Not Available

2009-07-01T23:59:59.000Z

290

Major Contract Solicitations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major Major Contract Solicitations Major Contract Solicitations Welcome to the DOE Headquarters major solicitation page. The following is a listing of major active solicitations. Contained within each solicitation link can be found draft and final solicitations, questions and answers, attachments and all other associated documentation necessary for potential offerors to participate along with contact information. Issuance of Special Notice - Operations and Maintenance Support Services for the iManage Program Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real Estate Approvals Documents and Publications Facilities and Infrastructure Federal Advisory Committee Management Freedom of Information Act Financial Assistance Information Systems

291

A Business Case for Home Performance Contracting  

Science Conference Proceedings (OSTI)

This report was prepared by PNNL for the DOE Building America program. The report provides information for businesses considering entering the home performance contracting industry. Metrics discussed include industry trends and drivers, specific points of entry, business models, startup costs, and marketing strategies. The report includes detailed analysis of eight businesses around the country that have successfully entered the home performance contracting industry. Data is provided on their financial structures, program participation, marketing efforts, and staff training. This report will be distributed via the DOE Building America website, www.buildingamerica.gov. Individual case studies will also be cleared separately.

Baechler, Michael C.; Antonopoulos, Chrissi A.; Sevigny, Maureen; Gilbride, Theresa L.; Hefty, Marye G.

2012-10-01T23:59:59.000Z

292

Federal Energy Management Program: Energy Savings Performance Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Savings Energy Savings Performance Contract Project Facilitators to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Facebook Tweet about Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Twitter Bookmark Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Google Bookmark Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Delicious Rank Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Digg Find More places to share Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on AddThis.com...

293

Federal Energy Management Program: Decreasing Utility Contract Interest  

NLE Websites -- All DOE Office Websites (Extended Search)

Decreasing Utility Decreasing Utility Contract Interest through Annual Payments to someone by E-mail Share Federal Energy Management Program: Decreasing Utility Contract Interest through Annual Payments on Facebook Tweet about Federal Energy Management Program: Decreasing Utility Contract Interest through Annual Payments on Twitter Bookmark Federal Energy Management Program: Decreasing Utility Contract Interest through Annual Payments on Google Bookmark Federal Energy Management Program: Decreasing Utility Contract Interest through Annual Payments on Delicious Rank Federal Energy Management Program: Decreasing Utility Contract Interest through Annual Payments on Digg Find More places to share Federal Energy Management Program: Decreasing Utility Contract Interest through Annual Payments on

294

MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,2008 ,2008 MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Contract Change Order Administration of Department of Energy Prime Contracts The purpose of this memorandum is to highlight the need for good contract administration of Department of Energy (DOE) contracts (non management and operating contracts) including those covered by DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. One of the focus areas of the DOE's efforts to improve contract and project management is the recopition that effectrve contract change order administration is critical to ensuring that contract and project requirements are met. Fundamentally, the award of an appropriate contract type that best

295

Contract Number: DE-AC05-76RL01830 Modification M412  

E-Print Network (OSTI)

: 143 kBtu/ft2 ) · At least 7.5% of electricity use from renewable sources by 2013 and thereafter · Reduce petroleum-based fuel use in fleet vehicles 20% from 2005-2015 (Target: 31,060 GGE) · Reduce GHG ENVIRONmENTal flEET VEHIclES Petroleum-based fuel use down 19% Alternative fuel use is up 10%bUSINESS TRa

296

Contract Number: DE-AC05-76RL01830 Modification M412  

E-Print Network (OSTI)

Commission (now FERC) to estimate the costs for feasibility studies to promote flood control, navigation

297

Contract Number: DE-AC05-76RL01830 Modification M433  

E-Print Network (OSTI)

) (9%) · Office of Energy Efficiency and Renewable Energy (EERE) (7%) · Office of Fossil Energy (FE) (4 Office of Energy Efficiency and Renewable Energy (EERE) 1.1 Impact 30% 1.2 Leadership 30% 1.3 Output 20 of Environmental Management 9% Office of Energy Efficiency and Renewable Energy 7% Office of Fossil Energy 4

298

Contract Number: DE-AC05-76RL01830 Modification M840  

E-Print Network (OSTI)

.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM CRD O 200.1A INFORMATION TECHNOLOGY MANAGEMENT CRD M 200 NO. DIRECTIVE TITLE CRD O 430.1B, Chg 1 REAL PROPERTY AND ASSET MANAGEMENT CRD O 433.1B MAINTENANCE.1-1 CHAPTER 9 PUBLIC KEY CRYPTOGRAPHY AND KEY MANAGEMENT CRD O 205.1B DEPARTMENT OF ENERGY CYBER SECURITY

299

Contract Number: DE-AC05-76RL01830 Modification M873  

E-Print Network (OSTI)

for the acquisition of the High Performance Computing System-4 (HSPC-4), which will be procured and placed

300

Contract Number: DE-AC05-76RL01830 Modification M920  

E-Print Network (OSTI)

, Environmental Protection Agency EPA, Environmental Protection Agency 37,136 9/30/2013 63496 55898 - Shell Oil Co. Shell Oil Company Shell Oil Company 360,000 12/31/2014 63453 Carbon Sequestration Field Pilot Study - National Cancer Institute 600,000 6/30/2013 63500 Exceptional, Unconventional Research Enabling Knowledge

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Contract Number: DE-AC05-76RL01830 Modification M688  

E-Print Network (OSTI)

CONFERENCE MANAGEMENT CRD O 130.1 BUDGET FORMULATION CRD M 140.1-1B INTERFACE WITH THE DEFENSE NUCLEAR CRYPTOGRAPHY AND KEY MANAGEMENT CRD O 205.1A DEPARTMENT OF ENERGY CYBER SECURITY MANAGEMENT PROGRAM CRD M 205.1-3 TELECOMMUNICATIONS SECURITY MANUAL CRD M 205.1-4 NATIONAL SECURITY MANUAL CRD M 205.1-5 CYBER SECURITY PROCESS

302

Table of Contents for Prime Contract Number DE-AC36-98GO10337  

NLE Websites -- All DOE Office Websites (Extended Search)

. . . . . . . . . . . . . 45 H-15 LOBBYING RESTRICTION (ENERGY & WATER DEVELOPMENT APPROPRIATIONS ACT, 1998) (AL 97-10) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

303

Contract Number: DE-AC05-76RL01830 Modification M920  

E-Print Network (OSTI)

for DOE's Energy Efficiency and Renewable Energy (EERE) Office, visitedArgonne on March 21 to learn more about research, development, and deployment activities taking place at Argonne in support of key EERE and Renewable Energy (EERE) Office, visited Argonne on March 21 to learn more about research, development

304

Contract Number: DE-AC05-76RL01830 Modification M842  

E-Print Network (OSTI)

at real-world speeds and loads by engineers at Argonne. DOE EERE Assistant Secretary Andy Karsner with Steve Chuslo, also from EERE, tour Argonne's energy efficiency labs and facilities. Page 3 Market,contact StevenCiatti phone:630/252-5635 email:SCiatti@anl.gov Top: DOE EERE Assistant Secretary Andy Karsner

305

A Guide to Performance Contracting with ESCOs  

SciTech Connect

An energy services company (ESCO) can identify energy improvements, provide the capital required and installs improvements, offers turn-key installation services, and guarantees energy savings. Companies pay the ESCO back over a period of years from the energy cost savings generated from the project. Hiring an ESCO is a proven strategy for identifying and implementing energy saving capital improvements, while managing risks inherent in such projects. ESCOs can provide a range of services, from an energy audit to a third-party financed turn-key project with a comprehensive set of measures and guaranteed energy savings. Their specialty is the performance contract that shifts some of the project's performance risk to the ESCO in exchange for allowing the ESCO to capture a share of the savings. Key benefits to working with ESCOs include improved building performance, options for project financing and risk management, and access to expertise, new equipment and training with little to no upfront cost. Performance contracts can apply to an individual building, campuses, or whole portfolios. This guide describes the benefits offered by ESCOs and the things to consider when selecting and contracting with your provider. ESCOs have long served government markets. Performance contracting can be an effective investment approach for the private sector as well.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

306

Economic efficiency, IRPs and long term contracts  

SciTech Connect

There is no market failure that warrants utility regulation of the construction of new generating plants, the supply of energy efficiency or the purchase of fuel under contract. The natural monopoly problem applies to the distribution of electricity and gas, not to generation, energy conservation, or gas purchases. Utility regulation magnifies a market failure, which is the principal agent problem. Regulatory allowance of utilities signing long term fixed price contracts and undertaking conservation measures result in costs and risks being shifted to ratepayers that would not occur under competitive market conditions. Economic efficiency would be enhanced if cost of service regulation of electric and gas utilities were replaced by a competitive market process for the construction of new power plants, utility conservation programs and contracts to purchase fuel. Conservation measures could be supplied by energy service companies. Gas merchants could provide gas and energy conservation directly to ultimate customers, if they had access to LDC pipelines. With a competitive market established to sell gas and energy services, contracts and conservation measures would not require cost-of- service regulation.

Sutherland, R.J.

1993-04-30T23:59:59.000Z

307

Geothermal Energy Contract List: Fiscal Year 1990  

DOE Green Energy (OSTI)

The Geothermal Division of the US Department of Energy (DOE) is charged with the lead federal role in the research and development (R D) of technologies that will assist industry in economically exploiting the nation's vast geothermal resources. The Geothermal Energy R D Program represents a comprehensive, balanced approach to establishing all forms of geothermal energy as significant contributors to the nation's energy supply. The program is structured both to maintain momentum in the growth of the existing hydrothermal industry and to develop long-term options offering the greatest promise for practical applications. The Geothermal Energy Contract List, Fiscal Year 1990 is a tabulation of geothermal R D contracts that were begun, ongoing, or completed during FY 1990 (October 1, 1989 through September 30, 1990). The R D activities are performed by national laboratories or industrial, academic, and nonprofit research institutions. The contract list is organized in accordance with the Geothermal Division R D work breakdown structure. The structure hierarchy consists of Resource Category (hydrothermal, geopressured-geothermal, hot dry rock, and magma energy), Project (hard rock penetration, reservoir technology, etc.), and Task (lost circulation control, rock penetration mechanics, etc.). For each contract, the contractor, the FY 1990 funding, and a brief description of the milestones planned for FY 1991 are provided.

Not Available

1991-10-01T23:59:59.000Z

308

Solar and Allison receive ATS contracts  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) has awarded contracts to Solar Turbines Incorporated and Allison Engine Company, for development of advanced power generation engines in the under-20-MW category, as part of Phase III of the Advanced Turbine Systems (ATS) program. The contracts are for construction of complete prototype engines. Solar`s contract, announced on September 15, is for development of 5- and 15-MW engines. Allison`s contract, announced October 17, is for a family of engines in the 4.5- to 11-MW range. Solar`s 5- and 15-MW engines will be variations on the same design, with the smaller engine being the focus of engineering work, and the larger one scale up from it. The Solar ATS engine will be a two-shaft, simple-cycle engine. Efficiency targets are 42% for the 5-MW engine and 43% for the 15-MW model. The NOx target is `single digits.` The Allison ATS engine family will cover the power range from 4.5-11MW. The engines will be two-shaft, simple-cycle units. The DOE target for (LHV) simple cycle efficiency is 15% over the best current technology, which would mean something close to 40%. Allison`s target for NOx is a ppm figure in the single digits. 1 fig.

NONE

1995-11-01T23:59:59.000Z

309

Future Contracts and Options Commodity markets  

E-Print Network (OSTI)

the concurrent use of both cash and futures markets · Consider the case of a flour mill which has made heavy forward sales of flour, that requires more uncommitted wheat that the mill owns. ­ to hedge these flour sales, the mill needs to secure more wheat contracts in future when there is enough resources from

Boisvert, Jeff

310

A Guide to Performance Contracting with ESCOs  

SciTech Connect

An energy services company (ESCO) can identify energy improvements, provide the capital required and installs improvements, offers turn-key installation services, and guarantees energy savings. Companies pay the ESCO back over a period of years from the energy cost savings generated from the project. Hiring an ESCO is a proven strategy for identifying and implementing energy saving capital improvements, while managing risks inherent in such projects. ESCOs can provide a range of services, from an energy audit to a third-party financed turn-key project with a comprehensive set of measures and guaranteed energy savings. Their specialty is the performance contract that shifts some of the project's performance risk to the ESCO in exchange for allowing the ESCO to capture a share of the savings. Key benefits to working with ESCOs include improved building performance, options for project financing and risk management, and access to expertise, new equipment and training with little to no upfront cost. Performance contracts can apply to an individual building, campuses, or whole portfolios. This guide describes the benefits offered by ESCOs and the things to consider when selecting and contracting with your provider. ESCOs have long served government markets. Performance contracting can be an effective investment approach for the private sector as well.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

311

Vertical Contracts and Mandatory Universal Distribution  

E-Print Network (OSTI)

Vertical Contracts and Mandatory Universal Distribution Larry S. Karp Jeffrey M. Perloff July 2012 vendor. If a monopoly uses a single vendor, the government may impose a mandatory universal distribution consumer welfare. Keywords: vertical restrictions, mandatory universal distribution, new product oligopoly

Kammen, Daniel M.

312

Gaussian random number generators  

Science Conference Proceedings (OSTI)

Rapid generation of high quality Gaussian random numbers is a key capability for simulations across a wide range of disciplines. Advances in computing have brought the power to conduct simulations with very large numbers of random numbers and with it, ... Keywords: Gaussian, Random numbers, normal, simulation

David B. Thomas; Wayne Luk; Philip H.W. Leong; John D. Villasenor

2007-11-01T23:59:59.000Z

313

New England Wind Forum: Interviews with Wind Industry Stakeholders and  

Wind Powering America (EERE)

Small Wind Small Wind Large Wind Newsletter Perspectives Events Quick Links to States CT MA ME NH RI VT Bookmark and Share Interviews With Wind Industry Stakeholders and Pioneers in New England The New England Wind Forum will interview different stakeholders actively shaping the wind power landscape in New England and wind pioneers to examine how they have laid the groundwork for today's New England wind energy market. Stephan Wollenburg, Green Energy Program Director of Energy Consumers Alliance of New England January 2013 A Panel of Seven Offer Insight into the Evolving Drivers and Challenges Facing Wind Development in New England June 2011 John Norden, Manager of Renewable Resource Integration, Independent System Operator-New England September 2010 Angus King, Former Governor of Maine and Co-Founder of Independence Wind

314

An Interview with LANL's International, Space, and Response (ISR) New  

NLE Websites -- All DOE Office Websites (Extended Search)

An Interview with LANL's International, Space, and Response (ISR) New An Interview with LANL's International, Space, and Response (ISR) New Division Leader Kevin Saeger was appointed Los Alamos National Laboratory International, Space, and Response Division Leader in 2010. Formerly a Decision Applications Division group leader, Saeger has worked at the Laboratory for ten years. Saeger has a bachelor's degree in aerospace engineering, and master's and doctoral degrees in aeronautics and astronautics from the Massachusetts Institute of Technology. NSS: Your experience has been diverse-aerospace engineering, software design, working at the Pentagon, and leading a LANL risk analysis group to halt terrorism. What attracted you to ISR? ISR is unparalleled in its ability to successfully integrate science, engineering, and technology to deliver custom sensors to the field. ISR has

315

Sixth Interview with Sir Eli Lauterpacht - 2 April 2008  

E-Print Network (OSTI)

. It no longer has the allure that it had in those days. Today, international lawyers are much more concerned with, let us say, the environment and climate change and so on. 164. Well now, passing on from the continental international lawyers whom I recall, I... character, namely, Clive Parry20. 14 He was Senior Military War Crimes Prosecutor in the British Occupied Zone of Germany, 1947-49. In 1945 he interviewed Rudolf Hoess, Commandant of Auschwitz. 15 See...

Dingle, Lesley; Bates, Daniel

2008-06-19T23:59:59.000Z

316

Alternative Fuels Data Center: Biofuel Blending Contract Regulation  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuel Blending Biofuel Blending Contract Regulation to someone by E-mail Share Alternative Fuels Data Center: Biofuel Blending Contract Regulation on Facebook Tweet about Alternative Fuels Data Center: Biofuel Blending Contract Regulation on Twitter Bookmark Alternative Fuels Data Center: Biofuel Blending Contract Regulation on Google Bookmark Alternative Fuels Data Center: Biofuel Blending Contract Regulation on Delicious Rank Alternative Fuels Data Center: Biofuel Blending Contract Regulation on Digg Find More places to share Alternative Fuels Data Center: Biofuel Blending Contract Regulation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Blending Contract Regulation Any provision in a contract between a fuel wholesaler and a refiner or

317

Resources on Implementing Energy Savings Performance Contracts | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Funding » Energy Savings Performance Contracts » Project Funding » Energy Savings Performance Contracts » Resources on Implementing Energy Savings Performance Contracts Resources on Implementing Energy Savings Performance Contracts October 7, 2013 - 1:41pm Addthis Many resources are available to help Federal agencies implement energy savings performance contracts (ESPCs). Indefinite Delivery, Indefinite Quantity Energy Savings Performance Contracts Provides an introduction to Indefinite Delivery, Indefinite Quantity (IDIQ) ESPCs. ESPC IDIQ Contract (Modified January 2013) ESPC IDIQ Contract Modifications (Modifications below are those under the current ESPC IDIQ contract that are applicable to all energy service companies (ESCOs): ESCO specific modifications are not included below. Note that effective dates of modifications may vary slightly.)

318

Contract Modification Awarded for Legal Support | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Modification Awarded for Legal Support Contract Modification Awarded for Legal Support Contract Modification Awarded for Legal Support September 30, 2013 - 12:00pm Addthis Media Contact Lynette Chafin 513-246-0461 lynette.chafin@emcbc.doe.gov Cincinnati - The Department of Energy today awarded a contract modification to A R Biddle & Associates, Inc. of Peachtree City, GA to add scope for the contractor to analyze contract claims that are appealed to the Civilian Board of Contract Appeals (CBCA). The contract was awarded on February 15, 2013 for expert assistance in evaluating contract claims up to and including participation in alternative dispute resolution (ADR) proceedings. The modification will also increase the not-to-exceed value of the contract from $563,744.00 to approximately $1.2 million and will extend

319

Federal Energy Management Program: Utility Energy Service Contracts Laws  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracts Laws and Regulations to someone by E-mail Contracts Laws and Regulations to someone by E-mail Share Federal Energy Management Program: Utility Energy Service Contracts Laws and Regulations on Facebook Tweet about Federal Energy Management Program: Utility Energy Service Contracts Laws and Regulations on Twitter Bookmark Federal Energy Management Program: Utility Energy Service Contracts Laws and Regulations on Google Bookmark Federal Energy Management Program: Utility Energy Service Contracts Laws and Regulations on Delicious Rank Federal Energy Management Program: Utility Energy Service Contracts Laws and Regulations on Digg Find More places to share Federal Energy Management Program: Utility Energy Service Contracts Laws and Regulations on AddThis.com... Energy Savings Performance Contracts ENABLE

320

Federal Energy Management Program: Energy Savings Performance Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracts Laws and Regulations to someone by E-mail Contracts Laws and Regulations to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Facebook Tweet about Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Twitter Bookmark Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Google Bookmark Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Delicious Rank Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Digg Find More places to share Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on AddThis.com... Energy Savings Performance Contracts

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Poneman Joins EM Contract and Project Management Workshop | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop June 7, 2013 - 12:00pm Addthis Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance. Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance.

322

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research, Development, Research, Development, and Demonstration Roadmap for Deep Borehole Disposal Prepared for U.S. Department of Energy Used Fuel Disposition Campaign Bill W. Arnold, Palmer Vaughn, Robert MacKinnon, Jack Tillman, Dennis Nielson, Patrick Brady, William Halsey, and Susan Altman Sandia National Laboratories August 31, 2012 FCRD-USED-2012-000269 SAND2012-8527P Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy"s National Nuclear Security Administration under contract DE-AC04-94AL85000. DISCLAIMER

323

Energy Savings Performance Contract (ESPC) ENABLE Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance Contract (ESPC) ENABLE Program The Energy Savings Performance Contract (ESPC) ENABLE program, a new project funding approach, allows small Federal facilities to realize energy and water savings in six months or less. ESPC ENABLE provides a standardized and stream- lined process to install targeted energy conservation measures (ECMs) such as lighting, water, and controls with measurement and verification (M&V) appropriate for the size and scope of the project. This allows Federal facilities smaller than 200,000 square feet to make progress towards important energy efficiency and water conservation requirements. ESPC ENABLE Benefits ESPC ENABLE builds off the success of the U.S. Department of Energy Federal Energy Management Program's (FEMP)

324

DOE Facility Management Contracts Facility Owner Contractor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Univ. Of Chicago Argonne Univ. Of Chicago Argonne LLC 7/31/2006 9/30/2011 4 yrs Award Term Earned/additional 11 yrs Award Term Available 9/30/2026 M&O 2006 http://www.anl.gov/contract/ Patricia Schuneman 630-252-2956 Sergio Martinez 630-252-2075 Kristin Palmer 630-252-2127 Oak Ridge Environmental Management EM Bechtel Jacobs Co LLC 12/18/1997 12/31/2011 12/31/2011 Environmental Mgmt 1998 http://www.oakridge.doe.gov/external/Home/Procurement/RecentAwards/tabid/101/De fault.aspx Barbara Jackson 865-576-0976 Karen Shears 865-241-6411 Ames National Laboratory SC Iowa State University 12/4/2006 12/31/2011 4yrs Award Term Earned/additional 11yrs Award Term Available 12/31/2026 M&O 2007 http://www.ameslab.gov/operations/resources/contract Patricia Schuneman

325

41 CFR Public Contracts and Property Management  

NLE Websites -- All DOE Office Websites (Extended Search)

CFR Public Contracts and Property Management CFR Public Contracts and Property Management http://www.41cfr.info/[8/19/2011 3:01:42 PM] CFR TITLES Go to a CFR Title: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 9 | 10 | 11 | 12 | 13 | 14 15 | 16 | 17 | 18 | 19 | 20 21 | 22 | 23 | 24 | 25 | 26 27 | 28 | 29 | 30 | 31 | 32 33 | 34 | 35 | 36 | 37 | 38 39 | 40 | 41 | 42 | 43 | 44 45 | 46 | 47 | 48 | 49 | 50 PRINT EDITIONS The Code of Federal Regulations 1 CFR General Provisions 2 CFR Grants and Agreements 3 CFR The President 4 CFR Accounts 5 CFR Administrative Personnel 6 CFR Domestic Security 7 CFR Agriculture 8 CFR Aliens and Nationality 9 CFR Animal and Products 10 CFR Energy 11 CFR Federal Elections 12 CFR Banks and Banking 13 CFR Business and Credit Assistance 14 CFR Aeronautics and Space 15 CFR Commerce and Foreign T 16 CFR Commercial Practices

326

Recommendation for Appointment Electronic Commerce Contracting Officer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendation for Appointment Recommendation for Appointment Electronic Commerce Contracting Officer The following findings and determinations are made pursuant to applicable laws and regulations. There is a clear and convincing need to delegate electronic commerce contracting authority [attach a Statement of Need]. 2. ___________________________________ [insert nominee name], the nominee, is an employee of, or is detailed to the U.S. Department of Energy, or is an employee of a DOE Management and Operating Contractor _____________________________________________________________________. [insert DOE Office or M&O contractor name]. 3. The requested single purchase limit for the nominee is $25,000.00. |* Requests must be supported by a justification which, at a minimum, must address: (a) a description of the types of items the nominee will purchase;

327

Energy Savings Performance Contract (ESPC) ENABLE Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Contract (ESPC) ENABLE Program The Energy Savings Performance Contract (ESPC) ENABLE program, a new project funding approach, allows small Federal facilities to realize energy and water savings in six months or less. ESPC ENABLE provides a standardized and stream- lined process to install targeted energy conservation measures (ECMs) such as lighting, water, and controls with measurement and verification (M&V) appropriate for the size and scope of the project. This allows Federal facilities smaller than 200,000 square feet to make progress towards important energy efficiency and water conservation requirements. ESPC ENABLE Benefits ESPC ENABLE builds off the success of the U.S. Department of Energy Federal Energy Management Program's (FEMP)

328

DOE Facility Management Contracts Facility Owner Contractor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

transition) transition) 6/15/1999 6/30/2011 2 three month option periods 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 Bill Creech 859-219-4044 Argonne National Laboratory SC UChicago Argonne, LLC 7/31/2006 9/30/2015 4 yrs Award Term Earned/additional 11 yrs Award Term Available 9/30/2026 M&O 2006 http://www.anl.gov/contract/ Patricia Schuneman 630-252-2956 Sergio Martinez 630-252-2075 Kristin Palmer 630-252-2127 Oak Ridge Environmental Management

329

Utility Contract Competition | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competition Competition Utility Contract Competition October 7, 2013 - 2:26pm Addthis Opening utility energy service contracts to competing franchised utility companies ensures Federal agencies get the best value for their projects. Federal agencies are not legally required to compete for utility incentive services provided by the "established source" utility in the utility's franchised service territory. If services are available, the Energy Policy Act of 1992 states that there should be no restriction on Federal facilities directly benefiting from the services the same as any other customer. The exception is if there is more than one serving utility offering utility energy services (e.g., a gas company and an electric company). In this case, the Federal Acquisition Regulations and good fiscal management

330

DOE Awards Contract for Management of WIPP  

NLE Websites -- All DOE Office Websites (Extended Search)

NEWS NEWS MEDIA CONTACTS: FOR IMMEDIATE RELEASE Tom Welch, 202/586-4316 October 12, 2000 Greg Sahd (Carlsbad), 505/234-7532 Department of Energy Competitively Awards Contract for the Management of Waste Isolation Pilot Plant Secretary of Energy Bill Richardson today announced that the Energy Department will award a $500 million, five-year contract for the management and operation of the department's Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico, to Westinghouse TRU Solutions LLC. Westinghouse TRU Solutions LLC, based in Carlsbad, is a joint venture between Westinghouse Government Environmental Services Company LLC and Roy F. Weston, Inc. "By holding an open competition, the department was able to challenge industry to bring their best ideas forward on actions needed to maintain and improve WIPP's safety and operational

331

DOE Facility Management Contracts Facility Owner Contractor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UChicago Argonne, LLC UChicago Argonne, LLC 7/31/2006 9/30/2011 4 yrs Award Term Earned/additional 11 yrs Award Term Available 9/30/2026 M&O 2006 http://www.anl.gov/contract/ Patricia Schuneman 630-252-2956 Sergio Martinez 630-252-2075 Kristin Palmer 630-252-2127 Oak Ridge Environmental Management EM Bechtel Jacobs Co LLC 12/18/1997 12/31/2011 12/31/2011 Environmental Mgmt 1998 http://www.oakridge.doe.gov/external/Home/Procurement/RecentAwards/tabid/101/De fault.aspx Barbara Jackson 865-576-0976 Karen Shears 865-241-6411 Ames National Laboratory SC Iowa State University 12/4/2006 12/31/2011 4yrs Award Term Earned/additional 11 yrs Award Term Available 12/31/2026 M&O 2007 http://www.ameslab.gov/operations/resources/contract Patricia Schuneman

332

Utility Energy Services Contracts: Enabling Documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTRACTS: ENABLING DOCUMENTS Karen Thomas National Renewable Energy Laboratory Overview * The Enabling Documents for Utility Energy Services Contracts (UESCs) - provide a selected set of background information that clarify the authority for Federal agencies to enter into UESCs. - and, is designed to assist Federal agency acquisition teams who are interested in implementing energy service projects. The Federal agencies' partners have benefited from the Enabling Documents as well. * Energy Policy Act of 2005 * 42 U.S.C. § 8256, Energy Policy Act of 1992 * 10 U.S.C. § 2865, Energy Savings at Military Installations * 10 U.S.C. § 2866, Water Conservation at Military Installations Legislative & Executive Actions * Federal Acquisition Regulations, Part 41 - - Authorizes GSA to prescribe policy and methods for the

333

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

CONTRACT ID CODE j PAGE OF PAGES 1 I 2 2 AMENDMENT/MODIFICATION NO 3. EFFECTIVE DATE 4 REQUISITION/PURCHASE REO NO. 15. PROJECT NO. (II applicable) 220 See Block 16C 6 ISSUED BY CODE 05003 7 ADMINISTERED BY (lfolherthan Item 6) CODE 105003 NNSA/Los Alamos Sile Office NNSA/Los Alamos Site Office u.s. Department of Energy u.s. Department of Energy Los Alamos Site Office Los Alamos Site Office 3747 West Jemez Road 3747 West Jemez Road Los Alamos Los Alamos NM 87544 NM 87544 8. NAME AND ADDRESS OF CONTRACTOR (No .. street. county State and ZIP Code) ~ 9A. AMENDMENT OF SOLICITATION NO. LOS ALAMOS NATIONAL SECURITY, LLC A ttn: STEVE K. SHOOK 98 DATED (SEE ITEM 11) P.O. BOX 1663' MS P222 L OS ALAMOS Nt1 875450001 10A. MODIFICATION OF CONTRACT/ORDER NO

334

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

9 9 11. CONTRACT 10 CODE 1PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 25 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ . NO . 5 PROJECT NO. (If applicab/e) See Bl ock 1 6C 1 6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE 105007 NNSA / Pantex Site Office 05007 NNSA/Pantex Site Office U.S. Department of Energy U.S. Department of Energy Nt SA/ Pantex S it e Offi ce NNSA/Pantex Site Office P.O. Box 30030 P . O . Box 30030 Amarillo TX 79 1 20-0030 Amarillo TX 79 1 20 - 0030 8 NAME AND ADDRESS OF CONTRACTOR (No., streel, county, Siele end ZIP Code) 9A AMENDMENT OF SOLICITATION NO. (xl - BABCOCK & WILCOX TECHNICAL SERVICES PANTEX, L L C Attn : GARY ALLEN 9B . DATED (SEE /TEM 11) P,0 . BOX 30020

335

Photovoltaic energy: Contract list, fiscal year 1990  

DOE Green Energy (OSTI)

The federal government has conducted the National Photovoltaics Program since 1975. Its purpose is to provide focus, direction, and funding for the development of terrestrial photovoltaic technology as an energy option for the United States. In the past, a summary was prepared each year to provide an overview of the government-funded activities within the National Photovoltaics Program. Tasks conducted in-house by participating national laboratories or under contract by industrial, academic, and other research institutes were highlighted. This year's document is more concise than the summaries of previous years. The FY 1990 contract overview comprises a list of all subcontracts begun, ongoing, or completed by Sandia National Laboratory or the Solar Energy Research Institute during FY 1990 (October 1, 1989, through September 30, 1990). Under each managing laboratory, projects are listed alphabetically by project area and then by subcontractor name.

Not Available

1991-07-01T23:59:59.000Z

336

Utility Infrastructure Improvements Using GSA Areawide Contract  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - May 22-23 3 - May 22-23 San Francisco, CA Linda L. Collins, Contracting Officer, GSA Richard Butterworth, General Counsel, GSA  Federal Property Administrative Services Act of 1949, as amended - 40 U.S.C. 501  10 year authority for contracting  Prescribes policies and methods  Bundled utility service  Transportation/transmission services  Connections  Line Extensions  Transformers  Meters  Substations  Ancillary services for the provision of utility services  Agreements approved by Utility Commission   Term length same as other services  Government takes utility service in accordance with State Law  Green Button is an industry-led effort  Easy Access to usage data  Data provided as text file 

337

Quantum Random Number Generator  

Science Conference Proceedings (OSTI)

... trusted beacon of random numbers. You could conduct secure auctions, or certify randomized audits of data. One of the most ...

2013-08-30T23:59:59.000Z

338

EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract July 12, 2012 - 12:00pm Addthis DOE and UCOR employees held an event today celebrating the recent contract reconciliation. DOE and UCOR employees held an event today celebrating the recent contract reconciliation. OAK RIDGE, Tenn. - At a ceremony today, Oak Ridge's Environmental Management (EM) program and its prime contractor, URS | CH2M Oak Ridge, LLC (UCOR) celebrated the completion of the site's reconciled cleanup contract. The newly aligned contract accurately specifies the projects and activities that the site's cleanup contractor will perform. "The speedy completion of this process is a testament to DOE and UCOR contract teams and managers," said Sue Cange, acting manager of the Oak

339

Contract Information | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Information Contract Information Grants & Contracts Support Grants & Contracts Support Home About Funding Opportunity Announcements (FOAs) DOE National Laboratory Announcements Grants Process Grants Policy and Guidance FAQs Resources Contract Information Contact Information Grants & Contracts Support U.S. Department of Energy SC-43/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: 301-903-2859 E: sc.grantsandcontracts@science.doe.gov Contract Information Print Text Size: A A A RSS Feeds FeedbackShare Page A contract is "a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as

340

Contract Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Contract Management SLAC Site Office (SSO) SSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information SLAC Site Office U.S. Department of Energy Bldg 41, M/S 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 Contract Management Print Text Size: A A A RSS Feeds FeedbackShare Page SLAC Site Office (SSO) communicates and enforces contract requirements; reviews and approves contract performance and deliverables, and provides Contracting Officer direction and guidance to the SLAC National Accelerator Center (SLAC). SSO provides support for all contract, business operations and administrative matters. SSO reviews, approves and oversees business operations and administrative systems such as budget; financial management;

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Alternative Fuels Data Center: Biofuel Franchising Contract Regulations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuel Franchising Biofuel Franchising Contract Regulations to someone by E-mail Share Alternative Fuels Data Center: Biofuel Franchising Contract Regulations on Facebook Tweet about Alternative Fuels Data Center: Biofuel Franchising Contract Regulations on Twitter Bookmark Alternative Fuels Data Center: Biofuel Franchising Contract Regulations on Google Bookmark Alternative Fuels Data Center: Biofuel Franchising Contract Regulations on Delicious Rank Alternative Fuels Data Center: Biofuel Franchising Contract Regulations on Digg Find More places to share Alternative Fuels Data Center: Biofuel Franchising Contract Regulations on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Franchising Contract Regulations Franchise documents may not restrict a franchisee from participating in any

342

Contract Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Contract Management Ames Site Office (AMSO) AMSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-6167 F: (630) 252-2855 Contract Management Print Text Size: A A A RSS Feeds FeedbackShare Page The Ames Site Office's Contract Management provides leadership and maximizes the effective working relationship between Department of Energy (DOE) and the contractor; manages and administers the contract by setting and communicating expectations, integrating DOE requirements, authorizing work, and providing timely feedback to the contractor. Contract Summary and Background The Ames Laboratory contract is a cost-plus award-fee, performance-based

343

GAO Protest to AMWTP Contract Withdrawn | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protest to AMWTP Contract Withdrawn Protest to AMWTP Contract Withdrawn GAO Protest to AMWTP Contract Withdrawn July 29, 2011 - 12:00pm Addthis WASHINGTON, D.C. - On July 29, 2011, CH2M Hill Newport News Nuclear, LLC, withdrew its protest of the award of the waste processing contract at Idaho's Advanced Mixed Waste Treatment Plant (AMWTP). "We are pleased to be transitioning the AMWTP contract to Idaho Treatment Group (ITG), LLC today. While this contract award has had its challenges, we are pleased to be moving forward with the new contractor so that we can stay on schedule to meet our compliance milestone," said Office of Environmental Management Deputy Assistant Secretary Jack Surash, who oversees acquisition and contract management. The contract was awarded to ITG on May 27, 2011, and is estimated to be

344

Energy Department Awards Small Business Contract for Legacy Management Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Small Business Contract for Legacy Small Business Contract for Legacy Management Work to S.M. Stoller Corporation Energy Department Awards Small Business Contract for Legacy Management Work to S.M. Stoller Corporation July 2, 2007 - 2:54pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the award of a prime contract for the Department's Office of Legacy Management (LM) Support Services work to S.M. Stoller Corporation for surveillance and maintenance and technical support at more than 100 of DOE's legacy sites. The three-year contract, with one two-year extension option for a total of five years, is valued at approximately $170 million over the life of the contract and is one of the largest 100% small business contracts within DOE. The contract includes responsibility for legacy sites that have been

345

AMENDMENT OF SOLICITATION/MODIFICA TlON OF CONTRACT  

NLE Websites -- All DOE Office Websites (Extended Search)

MODIFICA TlON OF CONTRACT 11. CONTRACT 10 CODE I PAGE OF PAGES 1 I 1 2 AMENDMENTIMODIFICATION NO 3 EFFECTIVE DATE 4 REOUISITIONPURCHASE REO NO 15 PROJECT NO (If applicable) 174...

346

Chapter 31 - Contract Cost Principles and Procedures | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 - Contract Cost Principles and Procedures Chapter 31 - Contract Cost Principles and Procedures 31.1CostReasonableness0.pdf 31.2AllowableFoodandBeverageCostsatDOEandCo...

347

FIXED-PRICE CONTRACTING FOR DEPARTMENT OF ENERGY CLEANUP ACTIVITIES...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FIXED-PRICE CONTRACTING FOR DEPARTMENT OF ENERGY CLEANUP ACTIVITIES, CR-B-02-01 FIXED-PRICE CONTRACTING FOR DEPARTMENT OF ENERGY CLEANUP ACTIVITIES, CR-B-02-01 As part of its...

348

When governments break contracts : foreign firms in emerging economies  

E-Print Network (OSTI)

Emerging economy governments commit to protect the property rights of foreign firms through a variety of contracts, from treaties to direct agreements. In an era of liberalized capital flows, these contracts are thought ...

Wellhausen, Rachel L. (Rachel Louise)

2012-01-01T23:59:59.000Z

349

Performance Contracting and Energy Efficiency in the State Government Market  

E-Print Network (OSTI)

incentives, technical xiv Performance Contracting and Energy Efficiency in the Stateincentives, technical assistance, and Performance Contracting and Energy Efficiency in the Stateincentives provided through utility ratepayer-funded energy efficiency programs to state

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

350

Alternative Fuels Data Center: Fuel Exclusivity Contract Regulation  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Exclusivity Fuel Exclusivity Contract Regulation to someone by E-mail Share Alternative Fuels Data Center: Fuel Exclusivity Contract Regulation on Facebook Tweet about Alternative Fuels Data Center: Fuel Exclusivity Contract Regulation on Twitter Bookmark Alternative Fuels Data Center: Fuel Exclusivity Contract Regulation on Google Bookmark Alternative Fuels Data Center: Fuel Exclusivity Contract Regulation on Delicious Rank Alternative Fuels Data Center: Fuel Exclusivity Contract Regulation on Digg Find More places to share Alternative Fuels Data Center: Fuel Exclusivity Contract Regulation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fuel Exclusivity Contract Regulation Motor fuel franchise dealers may obtain alternative fuels from a supplier

351

Alternative Fuels Data Center: E85 Fuel Exclusivity Contract Regulations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

E85 Fuel Exclusivity E85 Fuel Exclusivity Contract Regulations to someone by E-mail Share Alternative Fuels Data Center: E85 Fuel Exclusivity Contract Regulations on Facebook Tweet about Alternative Fuels Data Center: E85 Fuel Exclusivity Contract Regulations on Twitter Bookmark Alternative Fuels Data Center: E85 Fuel Exclusivity Contract Regulations on Google Bookmark Alternative Fuels Data Center: E85 Fuel Exclusivity Contract Regulations on Delicious Rank Alternative Fuels Data Center: E85 Fuel Exclusivity Contract Regulations on Digg Find More places to share Alternative Fuels Data Center: E85 Fuel Exclusivity Contract Regulations on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type E85 Fuel Exclusivity Contract Regulations

352

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I, CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I, CONTRACT ID CODE I, CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM I I ) 8. NAME AND ADDRESS OF CONTRACTOR (No.. street, county, state, ZIP Code) I ( DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. M I 3 8 9A. AMENDMENT OF SOLICITATION NO. extended. 3. EFFECTIVE DATE See Block 16C CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

353

Solving Truckload Procurement Auctions Over an Exponential Number of Bundles  

Science Conference Proceedings (OSTI)

Truckload carriers provide hundreds of billions of dollars worth of services to shippers in the United States alone each year. Internet auctions provide these shippers with a fast and easy way to negotiate potential contracts with a large number of carriers. ... Keywords: combinatorial auctions, implicit bidding approach, network flows, truckload procurement

Richard Li-Yang Chen; Shervin AhmadBeygi; Amy Cohn; Damian R. Beil; Amitabh Sinha

2009-11-01T23:59:59.000Z

354

Renewable Energy RFPs: Solicitation Response and Wind Contract Prices  

E-Print Network (OSTI)

Energy RFPs: Solicitation Response and Wind Contract Pricesenergy capacity (especially wind). Though detailed information on bid prices

Wiser, Ryan; Bolinger, Mark

2005-01-01T23:59:59.000Z

355

Two-phase flow characteristics across sudden contraction in small rectangular channels  

SciTech Connect

This study examines the two-phase flow pattern change and pressure drop at the sudden contraction from small rectangular channels (3 x 9 mm and 3 x 6 mm) into a 3 mm diameter tube. A unique deflection of contraction pressure drop vs. vapor quality is observed at a very low quality regime with an unusual ''liquid like vena contracta''. The measured pressure drops are compared with existing correlations/models, but none of them can accurately predict the available database. By proposing a correction factor accounting for the influence of surface tension (Bond number and contraction ratio) to the original homogeneous model, considerable improvement of the predictive ability of homogeneous model is arrived. The mean deviation of this correlation is 26.18% applicable to the present data (80 points) and available literatures (357 points). (author)

Chen, Ing Youn; Chu, Mon-Chern [Mechanical Engineering Department, National Yunlin University of Science and Technology, Yunlin 640 (China); Liaw, Jane-Sunn; Wang, Chi-Chuan [Energy and Environment Research Laboratories, Industrial Technology Research Institute, Hsinchu 310 (China)

2008-09-15T23:59:59.000Z

356

Long-Term Contracts Under the Threat of Supplier Default  

Science Conference Proceedings (OSTI)

Contracting with suppliers prone to default is an increasingly common problem in some industries, particularly automotive manufacturing. We model this phenomenon as a two-period contracting game with two identical suppliers, a single buyer, deterministic ... Keywords: contracting, financial default, game theory, supply chain management

Robert Swinney; Serguei Netessine

2009-01-01T23:59:59.000Z

357

Cost estimation and analysis for government contract pricing in china  

Science Conference Proceedings (OSTI)

Software cost estimation methods and their applications in government contract pricing have been developed and practiced for years. However, in China, the government contract process has been questioned in some aspects. It is largely based on analogy ... Keywords: cost analysis., cost estimation, government contract pricing

Mei He; Ye Yang; Qing Wang; Mingshu Li

2007-05-01T23:59:59.000Z

358

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Report on Data Report on Corrosion Testing of Stainless Steel SNF Storage Canisters Prepared for U.S. Department of Energy Used Fuel Disposition Campaign D.G. Enos, C.R. Bryan, and K. M. Norman Sandia National Laboratories September 30, 2013 FCRD-UFD-2013-000324 SAND2013-8314P Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04- 94AL85000. DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty,

359

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RD&D Study Plan for RD&D Study Plan for Advancement of Science and Engineering Supporting Geologic Disposal in Bedded Salt- March 2013 Workshop Outcomes Prepared for U.S. Department of Energy Used Nuclear Fuel S. David Sevougian, SNL Robert J. MacKinnon, SNL Bruce A. Robinson, LANL Christi D. Leigh, SNL Douglas J. Weaver, LANL May 31, 2013 FCRD-UFD-2013-000161, Rev. 0 SAND2013-4386P Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Los Alamos National Laboratory is an equal opportunity employer operated by

360

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generic Deep Geologic Generic Deep Geologic Disposal Safety Case Prepared for U.S. Department of Energy Used Fuel Disposition Campaign G. Freeze, M. Voegele, P. Vaughn, J. Prouty, W.M. Nutt, E. Hardin, S.D. Sevougian Sandia National Laboratories Argonne National Laboratory August 2013 Revision 1 FCRD-UFD-2012-000146 SAND2013-0974P Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty,

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 Summary Report: 13 Summary Report: Post-Irradiation Examination of Zircaloy-4 Samples in Target Capsules and Initiation of Bending Fatigue Testing for Used Nuclear Fuel Vibration Integrity Investigations Prepared for U.S. Department of Energy Used Fuel Disposition Campaign R. H. Howard, Y. Yan, J. Wang, L. J. Ott, R. L. Howard Oak Ridge National Laboratory September 30, 2013 FCRD-UFD-2013-000369 Oak Ridge National Laboratory is a multi-program laboratory managed and operated by UT-Battelle, LLC for the U.S. Department of Energy under contract DE-AC05-00OR22725. DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty,

362

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INL/EXT-08-13979 INL/EXT-08-13979 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB National SCADA Test Bed Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 November 2008 INL/EXT-08-13979 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 Idaho National Laboratory Idaho Falls, Idaho 83415 http://www.inl.gov Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under DOE Idaho Operations Office Contract DE-AC07-05ID14517 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB

363

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deep Borehole Disposal Deep Borehole Disposal Research: Demonstration Site Selection Guidelines, Borehole Seals Design, and RD&D Needs Prepared for U.S. Department of Energy Used Fuel Disposition Campaign Bill W. Arnold, Patrick Brady, Susan Altman, Palmer Vaughn, Dennis Nielson, Joon Lee, Fergus Gibb, Paul Mariner, Karl Travis, William Halsey, John Beswick, and Jack Tillman Sandia National Laboratories October 25, 2013 FCRD-USED-2013-000409 SAND2013-9490P Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

364

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Degradation: Degradation: Experimental and Modeling Report (FCRD-UFD-2013-000404) Prepared for U.S. Department of Energy Used Fuel Disposition Campaign David C. Sassani, Carlos F. Jové Colón, Philippe Weck (Sandia National Laboratories) James L. Jerden Jr., Kurt E. Frey, Terry Cruse, William L. Ebert (Argonne National Laboratory) Edgar C. Buck, Richard S. Wittman (Pacific Northwest National Laboratory) October 17, 2013 SAND2013- 9077P Prepared by: Sandia National Laboratories Albuquerque, New Mexico 87185 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

365

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coupled Thermal-Hydrological-Mechanical Processes in Salt Coupled Thermal-Hydrological-Mechanical Processes in Salt ii November 15, 2012 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness, of any information, apparatus, product, or process disclosed, or represents that its use would not infringe

366

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INEEL/EXT-04-02423 INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Prepared by: Idaho National Engineering and Environmental Laboratory INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Idaho National Engineering and Environmental Laboratory INEEL National Security Division Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Office of Energy Assurance Under DOE Idaho Operations Office Contract DE-AC07-99ID13727 ABB SCADA/EMS System INEEL Baseline Summary Test Report INEEL/EXT-04-02423 November 2004 ABSTRACT The Idaho National Engineering and Environmental Laboratory

367

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TSPA Model Development TSPA Model Development and Sensitivity Analysis of Processes Affecting Performance of a Salt Repository for Disposal of Heat-Generating Nuclear Waste Prepared for U.S. Department of Energy Used Nuclear Fuel S. David Sevougian, SNL Geoff A. Freeze, SNL Michael B. Gross, SNL Joon Lee, SNL Christi D. Leigh, SNL Paul Mariner, SNL Robert J. MacKinnon, SNL Palmer Vaughn, SNL September 28, 2012 FCRD-UFD-2012-000320, Rev. 0 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

368

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommended Practices Guide For Securing Recommended Practices Guide For Securing ZigBee Wireless Networks in Process Control System Environments Draft April 2007 Author Ken Masica Lawrence Livermore National Laboratory Ken Masica page 1 LLNL Recommended Practices Guide Securing ZigBee Wireless Networks in Process Control System Environments ( D R A F T ) Ken Masica Vulnerability & Risk Assessment Program (VRAP) Lawrence Livermore National Laboratory (LLNL) for DHS US CERT Control Systems Security Program (CSSP) April 2007 This work was performed under the auspices of the U.S. Department of Energy by University of California, Lawrence Livermore National Laboratory under Contract W- 7405-Eng-48. This document was prepared as an account of work sponsored by an agency of the

369

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

I CONTRACT ID CODE Babcock & Wilcox Technical Services Pantex, LLC 9B. DATED (SEE ITEM 11) PO Box 30020 Amarillo, T X 79120 PAGE 1 OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I I DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 2. AMENDMENTIMODIFICATION NO. MI74 9A. AMENDMENT OF SOLICITATION NO. extended. CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

370

11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

11. CONTRACT ID CODE 11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 2. AMENDMENTIMODIFICATION NO. 258 6. ISSUED BY CODE 3. EFFECTIVE DATE See Block 16C 05008 4. REQUISITION/PURCHASE REQ. NO. 7. ADMINISTERED BY (If other than Item 6) 15. PROJECT NO. (If applicable) CODE 1 0 5 0 0 8 NNSA/Oakridge Site Office NNSA/Oakridge Site Office U.S. Department of Energy U. S. Department of Energy NNSA/Y-12 Site Office NNSA/Y-12 Site Office P.O. Box 2050 P.O. Box 2050 Building 9704-2 Building 9704-2 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No., str**t, county, SIal. and ZIP Code) ABCOCK & WILCOX TECHNICAL SERVICES Y-12, ttn: WILLIE J. WILSON o BOX 2009 02 SCARBORO RD. , Nl.149/MS 8004 AK RIDGE TN 378318004

371

Revised Acquisition Guide Chapter 42.5, Contract Management Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-24 2-24 Date: February 21, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Revised Acquisition Guide Chapter 42.5, Contract Management Planning Summary: The Department of Energy (DOE) has been on GAO's High Risk List for the past several years as a result of inadequate contract and project management. Accordingly, the improvement of contract administration is a critical issue for DOE. The Acquisition Guide chapter on Contract Management Planning has been completely revised to address this matter.

372

Energy Savings Performance Contract Project Facilitators | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Savings Performance Contract Project Facilitators Energy Savings Performance Contract Project Facilitators Energy Savings Performance Contract Project Facilitators October 7, 2013 - 1:39pm Addthis Project facilitators help Federal agencies avoid obstacles and expedite projects, guiding the acquisition team through the process of developing, awarding, and verifying savings from energy savings performance contract (ESPC) projects. Project facilitators are experienced, unbiased advisors who: Provide consultation about contract and funding issues, technology and engineering considerations, and measurement and verification processes Review cost and technical proposals Draft the agency's task order request for proposal Provide other services as requested. Federal agencies developing U.S. Department of Energy (DOE) ESPC projects

373

Comparing the Risk Profiles of Renewable and Natural Gas Electricity Contracts  

E-Print Network (OSTI)

Comparing the Risk Profiles of Renewable and Natural Gas Electricity Contracts: A Summary.............................................................................20 B. Natural Gas Tolling Contracts.............................................................................24 B. Natural Gas Tolling Contracts

Kammen, Daniel M.

374

Utility Energy Services Contracts: Enabling Documents Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents Documents Update San Diego, CA November 28, 2007 Deb Beattie & Karen Thomas Overview  Legislative & Executive Actions  Legal Opinions  Agency Guidance  Contracts  Sample Documents  Resources www.eere.energy.gov/femp/pdfs/28792.pdf Enabling Legislation for Utility Programs Energy Policy Act of 1992 Section 152(f) - Utility Incentive Programs Section 152(f) - Utility Incentive Programs Agencies:  Are authorized and encouraged to participate in utility programs generally available to customers  May accept utility financial incentives, goods, and services generally available to customers  Are encouraged to enter into negotiations with utilities to design cost effective programs to address unique needs of facilities used by agency

375

DOE-Wide NEPA Contracting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Wide NEPA Contracting DOE-Wide NEPA Contracting DOE-Wide NEPA Contracting DOE has seven indefinite delivery/indefinite quantity (task order) contracts for use by DOE Program and Field Offices nationwide, including the National Nuclear Security Agency (NNSA) and the Federal Energy Regulatory Commission.These contracts are for NEPA support services in preparing EISs and EAs, environmental reports and other documentation required by the Nuclear Regulatory Commission in its review of license applications, and other related environmental documents, such as floodplain and wetland assessments. The links above provide useful information to potential users of the DOE-wide NEPA contracts primarily DOE NEPA Compliance Officers, NEPA Document Managers, and Contracting Officers. The documents are public

376

Utility Energy Service Contracts Laws and Regulations | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracts Laws and Regulations Contracts Laws and Regulations Utility Energy Service Contracts Laws and Regulations October 7, 2013 - 2:19pm Addthis The Energy Policy Act (EPAct) of 1992 authorizes and encourages Federal agencies to participate in utility energy efficiency programs. Legislation authorizing utility energy service contracts (UESCs) is outlined below, along with legal opinions outlining the use of UESCs by Federal agencies. Laws and Regulations 42 USC Section 8256 (Energy Policy Act of 1992): Incentives for Federal agencies, legislation addressing contracts, the Federal Energy Efficiency Fund, utility incentive programs, and the Financial Incentive Program for Facility Energy Managers. 10 USC Section 2913: Outlines energy savings contracts and related activities, shared energy savings contracts, participation in gas or

377

DOE Awards New York Decommissioning Services Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New York Decommissioning Services Contract New York Decommissioning Services Contract DOE Awards New York Decommissioning Services Contract June 29, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 William.taylor@emcbc.doe.gov West Valley, NY -- The Department of Energy (DOE) today awarded a contract to CH2M Hill-B&W West Valley of Englewood, Colorado, for the Phase I Decommissioning and Facility Disposition activities at the West Valley Demonstration Project (WVDP). The contract is a performance-based, cost-plus-award-fee, completion type contract with cost and schedule incentives. The total contract value is $333.4 million. DOE has selected a phased approach for decommissioning activities at the WVDP. Phase I is the first of a two-phase process for the final decommissioning of the western New York site in accordance with the West

378

WIPP Mobile Loading Unit Contract - 8-27-12  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Awards Contract for WIPP Mobile Loading Unit Services DOE Awards Contract for WIPP Mobile Loading Unit Services Cincinnati, Ohio, August 27, 2012 - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The contract has a value of up to $17.8 million, with a three-year performance period and two- one year extension options. This contract was limited to Small Businesses. The Mobile Loading Unit contractor will load Contact Handled (CH) and Remote Handled (RH)

379

DOE Awards Small Business Contract for Site Characterization and Erosion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Small Business Contract for Site Characterization and DOE Awards Small Business Contract for Site Characterization and Erosion Control Work in Los Alamos, New Mexico DOE Awards Small Business Contract for Site Characterization and Erosion Control Work in Los Alamos, New Mexico September 30, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a new contract to CTI & Associates, of Wixom, MI. CTI is a small business. The Department will issue a time and material type contract with a three year period of performance and a not-to-exceed value of $2,249,264. Work performed under this contract will be performed at the contractor's facilities and at the Los Alamos National Lab in Los Alamos, NM. The work performed under this contract includes site characterization and

380

Contract Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Contract Management Fermi Site Office (FSO) FSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Fermi Site Office U.S. Department of Energy MS 118 P.O. Box 2000 Kirk Road and Pine Street Batavia, IL 60510 P: (630) 840-3281 F: (630) 840-3285 Contract Management Print Text Size: A A A RSS Feeds FeedbackShare Page The FSO Business and Contract Support Team implements the timely execution of all Fermi Research Alliance management and operating contract modifications and oversees initiatives for effective administration of Laboratory procurement, property, human resources, budget, accounting and financial management, internal audit, industrial relations, and Contractor performance requirements under the contract. The Team interacts regularly

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Review of the Department of Energy's Contract with AHTNA Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Department of Energy's Contract with AHTNA Government the Department of Energy's Contract with AHTNA Government Services Corporation Contract No: DE-AC52-04NA25282, OAS-L-09-01 Review of the Department of Energy's Contract with AHTNA Government Services Corporation Contract No: DE-AC52-04NA25282, OAS-L-09-01 The National Nuclear Security Administration (NNSA) awarded a general construction contract to AHTNA Government Services Corporation (AHTNA), an Alaskan Native Corporation (ANC), in September 2004. The contract was awarded under the Small Business Administration (SBA) Section 8(a) small disadvantaged business program to provide design, construction, and engineering services for radiation sensors and communication equipment in support of the Department of Energy's (Department) Second Line of Defense program.

382

Contract Awarded for Environmental Technical Services | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Awarded for Environmental Technical Services Contract Awarded for Environmental Technical Services Contract Awarded for Environmental Technical Services July 12, 2013 - 5:30pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) awarded a contract for Environmental Technical Services to Restoration Services Inc. of Oak Ridge, Tennessee, for support services at the Portsmouth Gaseous Diffusion Plant located near Piketon, OH. The contract was a competitive small business set-aside for a cost-plus-award-fee contract with an approximate value of $43 million, with a three-year base performance period plus one two-year option period. Services to be performed under the contract include: Program Management Planning and Integration Environmental Safety and Health (ES&H) and Quality Assurance (QA)

383

DOE Awards Contracts to Seven Small Businesses | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracts to Seven Small Businesses Contracts to Seven Small Businesses DOE Awards Contracts to Seven Small Businesses June 19, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati-The U.S. Department of Energy (DOE) today announced contract awards to seven small-disadvantaged businesses. Each contract will have a maximum value of approximately $4 million. The contracts will have terms of a one-year base period, with three one-year option periods. The small-businesses receiving the contracts are: Trinity Engineering Associates; Cincinnati, Ohio Terranear PMC; Irving, Texas Aspen Resources Limited; Boulder, Colorado DLE Technical Services; Palm City, Florida Boston Government Services; Lenoir City, Tennessee JG Management Systems; Grand Junction, Colorado

384

DOE Awards New York Decommissioning Services Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New York Decommissioning Services Contract New York Decommissioning Services Contract DOE Awards New York Decommissioning Services Contract June 29, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 William.taylor@emcbc.doe.gov West Valley, NY -- The Department of Energy (DOE) today awarded a contract to CH2M Hill-B&W West Valley of Englewood, Colorado, for the Phase I Decommissioning and Facility Disposition activities at the West Valley Demonstration Project (WVDP). The contract is a performance-based, cost-plus-award-fee, completion type contract with cost and schedule incentives. The total contract value is $333.4 million. DOE has selected a phased approach for decommissioning activities at the WVDP. Phase I is the first of a two-phase process for the final decommissioning of the western New York site in accordance with the West

385

DOE Discussion on Small Business Contract Barriers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Discussion on Small Business Contract Barriers Discussion on Small Business Contract Barriers DOE Discussion on Small Business Contract Barriers March 5, 2013 - 12:00pm Addthis EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash speaks during the session on barriers small businesses face competing for prime contracts. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash speaks during the session on barriers small businesses face competing for prime contracts. Pictured at the session on barriers in small business contracting, left to right, are Jim Fiore of Fiore Consulting; John Coffman of DeNuke Contracting Services, Inc.; John Hale III of the DOE Office of Small and Disadvantaged Business Utilization; Jack Surash of EM; and Matt Moeller of Dade Moeller.

386

EM Hosts Second Contract Performance and Management Workshop in 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Contract Performance and Management Workshop in Second Contract Performance and Management Workshop in 2012 EM Hosts Second Contract Performance and Management Workshop in 2012 August 29, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today. The goal of the workshop was to identify opportunities related to EM's goal to improve project, budget and contract management with the objective of delivering results on time, within cost and with world-class technical competencies. Participants in the workshop laid out steps to successfully implement opportunities identified to improve contract management at the first EM contract performance and management workshop held in February. In addition to DOE senior leadership, participants included corporate

387

EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts The Office of Environmental Management (EM) has 23 Indefinite Delivery/Indefinite Quantity (IDIQ) contracts to provide cleanup services at EM sites across the United States. The scope of work of the IDIQ contracts includes: environmental remediation deactivation, decommissioning, demolition and removal of contaminated facilities waste management regulatory compliance These nationwide, multiple-award IDIQ contracts allow EM sites to place timely, competitive and cost-effective task orders for environmental services with either large or small businesses, as determined by the complexity of the requirements. Twelve of the IDIQ contracts were awarded

388

EM Hosts Second Contract Performance and Management Workshop in 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Hosts Second Contract Performance and Management Workshop in EM Hosts Second Contract Performance and Management Workshop in 2012 EM Hosts Second Contract Performance and Management Workshop in 2012 August 29, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today. The goal of the workshop was to identify opportunities related to EM's goal to improve project, budget and contract management with the objective of delivering results on time, within cost and with world-class technical competencies. Participants in the workshop laid out steps to successfully implement opportunities identified to improve contract management at the first EM contract performance and management workshop held in February. In addition to DOE senior leadership, participants included corporate

389

Mode of interview and reporting of sensitive issues: Design and implementation of audio computer-assisted self-interviewing. NIDA Research Monograph 167:36682  

E-Print Network (OSTI)

Substantial underreporting is typical in interviewing respondents on their drug use and other sensitive behaviors. This chapter reviews established strategies, self-administered questionnaires and indirect questioning techniques, for increasing the willingness of respondents to report stigmatizing behaviors. While these methods improve reporting, each has shortcomings and burdens which limit their effectiveness. A new computer-based self-interviewing approach which incorporates recorded audio playback of questions offers improved self-administered interviewing. The chapter discusses this technology, audio computer-assisted self-interviewing (audio-CASI), describing its features and positive results from the early research tests of the method.

Judith T. Lessler; James M. Oreilly

1997-01-01T23:59:59.000Z

390

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

NLE Websites -- All DOE Office Websites (Extended Search)

3. EFFECTIVE DATE 3. EFFECTIVE DATE 225 See Block 16C 6. ISSUED BY CODE 00518 Oak Ridge U.S. Department of Energy P.O. Box 2001 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No .* street. county. State and ZIP Code) OAK RIDGE ASSOCIATED UNIVERSITIES, INC. P.O. BOX 117 OAK RIDGE TN 37830-6218 11. CONTRACT 10 CODE 4. REOUISITIONJPURCHASE REO. NO. 10SC009292 Item 07 7. ADMINISTERED BY (If other than Item 6) Oak Ridge U.S. Department of Energy P.O. Box 2001 Oak Ridge TN 37831 (x) 9A. AMENDMENT OF SOLICITATION NO. r- 98. DATED (SEE ITEM 11) I PAGE OF PAGES 1 I 1 15. PROJECT NO. (If applicable) CODE 100518 X 10A. MODIFICATION OF CONTRACT/ORDER NO. DE-AC05-060R23100 CODE 041152224 FACILITY CODE 108. DATED (SEE ITEM 13) 12/21/2005 11. THIS ITEM ONLY APPLIES TO AMEI DMENTS OF SOLICITATIONS

391

Texas Natural Gas Number of Industrial Consumers (Number of Elements...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) Texas Natural Gas Number of Industrial Consumers (Number of Elements) Texas Natural Gas Number of Industrial Consumers (Number of...

392

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 DATE: April 24, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 4.6 - Assigning Identifying Numbers Outside of the Strategic Integrated Procurement Enterprise System (STRIPES) SUMMARY: The subject guide chapter provides guidance on the DOE's procedures for assigning identifying numbers to all new requisitions, solicitations and business instruments processed outside of STRIPES. This Guide Chapter does not apply to instrument numbers issued and business instruments awarded prior to the deployment of STRIPES at the DOE. The guidance in this Flash will be available online at the following website:

393

11. CONTRACT ID CODE IPAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

,000 to the contract for an Office of Energy Efficiency and Renewable Energy (EERE) project entitled "EERE Recovery Act ofthe Work Authorization) EERE Recovery Act Bridge Program Direction (Management and Oversight) D ~idge NationaILaboratory(ORNL) .. . . In accordance with the approved EERE EE Bridge Recovery Program

394

Number | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number More Documents & Publications Analysis of Open Office of Inspector General Recommendations, OAS-L-08-07 Policy and International Affairs (WFP) Open Government Plan 2.0...

395

Expected Frobenius numbers  

E-Print Network (OSTI)

We show that for large instances the order of magnitude of the expected Frobenius number is (up to a constant depending only on the dimension) given by its lower bound.

Aliev, Iskander; Hinrichs, Aicke

2009-01-01T23:59:59.000Z

396

DOE Facility Management Contracts Facility Owner Contractor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ultimate Potential Ultimate Potential Expiration Date Contract FY Competed Parent Companies INEEL (AMWTP Ops) EM Bechtel BWXT Idaho LLC (Under Protest) 6/15/1999 3/31/2011 2 three month option periods until protest resolved 9/30/2011 M&O 1999 Bechtel National, Inc. (67%) and Babcock and Wilcox Company (33%) Portsmouth Remediation EM LATA/Parallax 1/10/2005 6/30/2010 2/28/2011 Site Clean up 2005 Los Alamos Technical Associates (LATA) 51%; Parallax (name changed to ES Performance Plus) 49% Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009 Los Alamos Technical Associates, Inc. 100% West Valley Demonstration Project EM West Valley Environmental Svcs 6/29/2007 6/30/2011 6/30/2011 Site Clean up 2007 URS -60% Jacobs - 20% ECC - 10% Paralax - 10%

397

Energy Savings Performance Contract Success Stories  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FDA WHITE OAK CAMPUS FDA WHITE OAK CAMPUS SILVER SPRING, MARYLAND Environmental Stewardship and Cost Savings ESPC SUCCESS STORY For construction of the FDA Campus in White Oak, MD, the General Services Administration (GSA) teamed up with Honeywell to construct a combined heat and power plant using Super Energy Savings Performance Contracts (ESPCs). The plant buildout is staged to match the multi-year campus development. The project is currently expanding to almost 20 MW of cogeneration, including a 5.6 MW dual fuel engine and three 4.5 MW natural gas combustion turbines. Other project features include two 1130-ton absorp- tion chillers, two 1130-ton and three 1980-ton electric chillers and three 10 MMBtu/hr hot water boilers. The ESPCs also include integrated plant controls,

398

CRSP Power Marketing and Contracts default  

NLE Websites -- All DOE Office Websites (Extended Search)

Financial Data Environmental Review-NEPA Operations Planning & Projects Power Marketing Rates Financial Data Environmental Review-NEPA Operations Planning & Projects Power Marketing Rates CRSP's Marketing Service Area Power Marketing As a marketer of Federal power, Colorado River Storage Project Management Center's Power Marketing staff provides a variety of services for customers and the utility industry, including long term power purchases and transmission contracts. Energy Services Power Allocations FY2009 & After Current Customer Seasonal Summary (pdf) FY2009 & After New Customer Seasonal Summary (pdf) Post 2004 SHP Energy Determination Documents and Meeting Handouts Customer Meetings & Rate Adjustment Schedule For Long-Term Solution (pdf) GC Lake Elevations Graph - 8/2003 Hydrology Study (pdf) Generation Forecast Graph - 8/2003 Hydrology Study(pdf)

399

Report number codes  

SciTech Connect

This publication lists all report number codes processed by the Office of Scientific and Technical Information. The report codes are substantially based on the American National Standards Institute, Standard Technical Report Number (STRN)-Format and Creation Z39.23-1983. The Standard Technical Report Number (STRN) provides one of the primary methods of identifying a specific technical report. The STRN consists of two parts: The report code and the sequential number. The report code identifies the issuing organization, a specific program, or a type of document. The sequential number, which is assigned in sequence by each report issuing entity, is not included in this publication. Part I of this compilation is alphabetized by report codes followed by issuing installations. Part II lists the issuing organization followed by the assigned report code(s). In both Parts I and II, the names of issuing organizations appear for the most part in the form used at the time the reports were issued. However, for some of the more prolific installations which have had name changes, all entries have been merged under the current name.

Nelson, R.N. (ed.)

1985-05-01T23:59:59.000Z

400

Additional Storage Contracts Awarded for Northeast Home Heating Oil Reserve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Additional Storage Contracts Awarded for Northeast Home Heating Oil Additional Storage Contracts Awarded for Northeast Home Heating Oil Reserve Additional Storage Contracts Awarded for Northeast Home Heating Oil Reserve September 30, 2011 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has completed the acquisition of commercial storage services for the one million barrel Northeast Home Heating Oil Reserve (NEHHOR). Two awards totaling 350,000 barrels have been made to companies that had earlier received storage contracts totaling 650,000 barrels. Hess Corporation in Groton, CT has been awarded a second contract for 100,000 barrels, increasing its storage obligation to 500,000 barrels. Global Companies LLC in Revere, MA was awarded a second contract for 250,000 barrels, increasing its obligation to 500,000 barrels.

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

New Contracts Awarded for Continued Fill of Strategic Petroleum Reserve |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracts Awarded for Continued Fill of Strategic Petroleum Contracts Awarded for Continued Fill of Strategic Petroleum Reserve New Contracts Awarded for Continued Fill of Strategic Petroleum Reserve February 15, 2005 - 10:12am Addthis WASHINGTON, DC -- The U.S. Department of Energy has awarded two new contracts to deliver crude oil to the Strategic Petroleum Reserve (SPR) this spring under the Royalty-In-Kind (RIK) exchange program. Shell Trading (US) Company and Vitol SA Inc. submitted the best offers and were awarded four-month contracts to deliver 78,000 barrels per day to the SPR, beginning in April. As with all recent oil delivery contracts to the SPR, the crude oil will come from exchange arrangements the companies make for RIK crude produced from federal offshore leases in the Gulf of Mexico and owed to the U.S.

402

DOE Exercises Option for Mission Support Contract | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exercises Option for Mission Support Contract Exercises Option for Mission Support Contract DOE Exercises Option for Mission Support Contract December 16, 2013 - 12:00pm Addthis Media Contact Cameron Salony, DOE 509-376-0402, Cameron.Salony@rl.doe.gov Mission Support Alliance to Provide Site Services at Hanford through May 2017 WASHINGTON, DC - The Department of Energy (DOE) is extending Mission Support Alliance's (MSA) contract for infrastructure and site services at the Hanford Site in southeastern Washington state by three years. In 2009, following a competitive bid, DOE awarded MSA a cost-plus-award-fee contract valued at approximately $3 billion for up to 10 years, with a five-year base period. The department is exercising the first of two options for extension. The contract has been extended through May 2017 for

403

Department of Energy Announces Intent to Extend Hanford Site Contract |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Announces Intent to Extend Hanford Site Department of Energy Announces Intent to Extend Hanford Site Contract Department of Energy Announces Intent to Extend Hanford Site Contract April 25, 2012 - 12:00pm Addthis Media Contact Cameron Hardy, DOE (509) 376-5365, Cameron.Hardy@rl.doe.gov RICHLAND, Wash. - The Department of Energy (DOE) plans to extend CH2M HILL Plateau Remediation Company's contract for environmental cleanup at the Hanford Site by another five years. In 2008, following a competitive bid, DOE awarded CH2M HILL a cost-plus, award-fee contract valued at approximately $4.5 billion over ten years, including a five-year base period with the option to extend the contract for another five years. DOE evaluated whether or not extending the contract was in the best interest of the government.

404

Getting the Best Value with Utility Energy Service Contracts | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Funding » Utility Energy Service Contracts » Getting the Project Funding » Utility Energy Service Contracts » Getting the Best Value with Utility Energy Service Contracts Getting the Best Value with Utility Energy Service Contracts October 7, 2013 - 2:20pm Addthis Federal agencies benefit from lessons learned during utility energy service contracts (UESCs). Over the years, best practices to get the best value from UESCs have been identified from successful UESC projects. While each Federal facility and its relationship with serving utilities is unique, considering lessons learned across these topics can make UESCs more successful and easier to implement: Financing Decreasing Interest Buydown and Buyout Approaches Contract Competition Diversifying Project Portfolios. Read about 10 ways to lower perceived risks to ensure UESC success.

405

Oversight of Performance-based Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oversight of Performance-based Contracts Oversight of Performance-based Contracts Oversight of Performance-based Contracts DOE's use of performance-based approaches in acquiring everything from routine services to construction of complex research facilities to environmental clean-up has yielded impressive dividends through higher quality performance and improved cost control by the contractor. The use of performance-based approaches drives fundamental changes in traditional contract administration techniques, as well as the need for more effective contract administration tools. This training session provides an overview of the latest techniques available to administer performance-based contracts, including the use of Earned Value Management (EVM) techniques, a project management tool that can be used to more

406

Additional Storage Contracts Awarded for Northeast Home Heating Oil Reserve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Additional Storage Contracts Awarded for Northeast Home Heating Oil Additional Storage Contracts Awarded for Northeast Home Heating Oil Reserve Additional Storage Contracts Awarded for Northeast Home Heating Oil Reserve September 30, 2011 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has completed the acquisition of commercial storage services for the one million barrel Northeast Home Heating Oil Reserve (NEHHOR). Two awards totaling 350,000 barrels have been made to companies that had earlier received storage contracts totaling 650,000 barrels. Hess Corporation in Groton, CT has been awarded a second contract for 100,000 barrels, increasing its storage obligation to 500,000 barrels. Global Companies LLC in Revere, MA was awarded a second contract for 250,000 barrels, increasing its obligation to 500,000 barrels.

407

DOE Awards Contract for Decontamination & Decommissioning Project for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Contract for Decontamination & Decommissioning Project DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park April 29, 2011 - 12:00pm Addthis Media Contact Mike Koentop (865) 576-0885 www.oakridge.doe.gov Oak Ridge, Tenn. - As part of its ongoing commitment to cleaning up the legacy of the Cold War at sites across the weapons complex, the U.S. Department of Energy has awarded a contract for the remaining environmental cleanup at the East Tennessee Technology Park (ETTP) to URS | CH2M Oak Ridge, LLC. The $2.2 billion contract will complete cleanup and provide support functions at ETTP, while supporting local jobs and area small businesses. "Today's contract announcement means that we can continue to meet our

408

EM, Industry Partner to Lay Out Opportunities to Improve Contract  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM, Industry Partner to Lay Out Opportunities to Improve Contract EM, Industry Partner to Lay Out Opportunities to Improve Contract Performance Following Workshop EM, Industry Partner to Lay Out Opportunities to Improve Contract Performance Following Workshop March 14, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM and its large and small business partners will implement several recommendations that emerged from a workshop held earlier this year to improve contract performance with the objective of delivering results on time and within cost. Participants in the Environmental Management Contract Performance and Management Workshop held in February proposed several opportunities to address more effective and efficient contract performance and management. Many of these opportunities are the next phase of implementation of recommendations from a similar EM-hosted workshop in 2010.

409

Number | Open Energy Information  

Open Energy Info (EERE)

Number Number Jump to: navigation, search Properties of type "Number" Showing 200 properties using this type. (previous 200) (next 200) A Property:AvgAnnlGrossOpCpcty Property:AvgTempGeoFluidIntoPlant Property:AvgWellDepth B Property:Building/FloorAreaChurchesChapels Property:Building/FloorAreaGroceryShops Property:Building/FloorAreaHealthServices24hr Property:Building/FloorAreaHealthServicesDaytime Property:Building/FloorAreaHeatedGarages Property:Building/FloorAreaHotels Property:Building/FloorAreaMiscellaneous Property:Building/FloorAreaOffices Property:Building/FloorAreaOtherRetail Property:Building/FloorAreaResidential Property:Building/FloorAreaRestaurants Property:Building/FloorAreaSchoolsChildDayCare Property:Building/FloorAreaShops Property:Building/FloorAreaSportCenters

410

PORTLAND STATE UNIVERSITY HOUSING 2013-2014 PROPOSED CONTRACT TERMS & CONDITIONS  

E-Print Network (OSTI)

PORTLAND STATE UNIVERSITY HOUSING 2013-2014 PROPOSED CONTRACT TERMS & CONDITIONS PAGE 1 OF 6 HOUSING CONTRACT TERMS & CONDITIONS 1) Term of Contract: This Contract is binding upon signature (for not release Resident from the financial obligations of this Contract. ii. See Summer Contract for Summer term

Bertini, Robert L.

411

Using Fractional Numbers of . . .  

E-Print Network (OSTI)

One of the design parameters in closed queueing networks is Np, the number of customers of class p. It has been assumed that Np must be an integer. However, integer choices will usually not achieve the target throughput for each class simultaneously. We use Mean Value Analysis with the Schweitzer-Bard approximation and nonlinear programming to determine the value of Np needed to achieve the production targets exactly, although the values of Np may be fractional. We interpret these values to represent the average number of customers of each class in the network. We implement a control rule to achieve these averages and verify our approach through simulation.

Rajan Suri; Rahul Shinde; Mary Vernon

2005-01-01T23:59:59.000Z

412

REQUESTS FOR PAYMENTS UNDER FIRM-FIXED PRICE CONSTRUCTION CONTRACTS  

REQUESTS FOR PAYMENTS UNDER FIRM-FIXED PRICE CONSTRUCTION CONTRACTS Author: wshelto Last modified by: wshelto Created Date: 2/28/2008 3:26:00 PM Company:

413

Federal Energy Management Program: Utility Energy Service Contract...  

NLE Websites -- All DOE Office Websites (Extended Search)

and their partnering utilities can request on-site FEMP partnership meetings and utility energy service contract (UESC) training. FEMP experts will train partnership meeting...

414

Federal Energy Management Program: Utility Energy Service Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

(OMB) guidance on reporting to the Federal Energy Management Program and OMB. Utility energy service contracts (UESCs) offer Federal agencies an effective means to implement...

415

Federal Energy Management Program: Utility Energy Service Contract...  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts For more information about utility energy service contracts, contact: David McAndrew Federal Energy Management Program 202-586-7722 Karen Thomas National Renewable Energy...

416

Guidance on New Construction under an Energy Savings Performance Contract  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

417

" Federal Utility Energy Service Contracts"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Utility Energy Service Contracts" Federal Utility Energy Service Contracts" "*KEY ON SHEET 2*" "Agency","Facility","Utility","Contract Type","Contract Term","Task Order/Delivery Order","Award Date","Completion Date","Energy Conservation Measures Implemented In Project (Enter as many as applicable - See Key)","Project's Capital Cost ($)","Percent of Total Cost 3rd Party Financed","Rebate Amount ($)","Estimated Annual Cost Savings ($)","Estimated Annual kWh Saved","Estimated Annual KW Saved","Estimated Annual Natural Gas savings (please specify cubic feet, therms or MMBtu)","Estimated Annual Oil savings (gallons)","Estimated Annual water savings (gallons)"

418

Guidance on New Construction under an Energy Savings Performance Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

419

TO: Procurement Directors FROM: Director, Contracts and Financial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors FROM: Director, Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: DOE O 580.1A...

420

Analysis of Firm Transportation Contracts: Results and Methodology  

U.S. Energy Information Administration (EIA)

The pipeline companies must provide firm transportation ... 1996, no rollover amount, and a contract length of 1 year or more. Energy Information ...

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DOE Awards Small Business Contract to Support Cleanup of New...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Support Cleanup of New York West Valley Demonstration Project DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration Project March 1, 2013 -...

422

DOE Awards Native American, Tribally-Owned Small Business Contract...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awards Native American, Tribally-Owned Small Business Contract for Support Services to Savannah River Operations Office DOE Awards Native American, Tribally-Owned Small Business...

423

DOE Awards Small Business Contract for Support, Planning Services...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Support, Planning Services to Office of Environmental Management DOE Awards Small Business Contract for Support, Planning Services to Office of Environmental Management February 1,...

424

DOE Awards Small Business Contract for Administrative Support...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Support to the Office of Environmental Management DOE Awards Small Business Contract for Administrative Support to the Office of Environmental Management September...

425

Department of Energy to Compete Management and Operating Contracts...  

Office of Science (SC) Website

national laboratories over the next 18 months. These competitions are part of DOE's policy to compete M&O contracts for DOE National Laboratories to ensure the greatest...

426

NNSA Awards Contract for Largest Federal Wind Farm to Siemens...  

National Nuclear Security Administration (NNSA)

Awards Contract for Largest Federal Wind Farm to Siemens Government Technologies, Inc. | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing...

427

Swinerton Renewable Energy Awarded Contract to Construct and...  

Open Energy Info (EERE)

Energy Awarded Contract to Construct and Operate 250 MWac K Road Moapa Solar Plant Home > Groups > OpenEI Community Central Graham7781's picture Submitted by...

428

Department of Energy Awards Hanford River Corridor Contract To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington...

429

Jefferson Lab Contract to be Awarded to Jefferson Science Associates...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awarded to Jefferson Science Associates, LLC for Management and Operation of World-Class Office of Science Laboratory Jefferson Lab Contract to be Awarded to Jefferson Science...

430

Department of Energy Awards Contract for Management and Operation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Argonne National Laboratory to the University of Chicago Argonne, LLC Department of Energy Awards Contract for Management and Operation of Argonne National Laboratory to the...

431

AWARDICONTRACT 1. THIS CONTRACT IS A RATED ORDER -.JRATING PAGE  

NLE Websites -- All DOE Office Websites (Extended Search)

contract, DOE shall inform the Contractor in writing regarding any limitations on amonts available for operating and plant arid capital equipment expenditures under this...

432

L AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

of performance includes: Transition Term - the effective date of the Contract which was August 31, 2000, through September 30, 2000: Term - October 1, 2000 through September 30,...

433

Capacity Building for Energy Performance Contracting in European Union.  

E-Print Network (OSTI)

?? Energy Performance Contracting (EPC) is an important tool to disseminate energy efficiency measures. This study focuses on the main barriers and success factors for (more)

Basar, Ezgi

2013-01-01T23:59:59.000Z

434

Government data for federal contracts | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

2009, 2008, 2007, 2006 and 2007; GSA elibrary Schedule and Contracts; Schedule Sales Query Report Generation System, Schedule Sales Query Raw Data; North American Industry...

435

NYMEX Central Appalachian coal futures near-month contract final...  

Annual Energy Outlook 2012 (EIA)

Release Date: January 7, 2013 Next Release Date: January 2014 NYMEX Central Appalachian coal futures near-month contract final settlement price history Data as of 12312012....

436

IMCA-CAT Management Contract to Be Re-Competed  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Division XSD Groups Industry Argonne Home Advanced Photon Source IMCA-CAT Management Contract to Be Re-Competed Partnerships for IMCA Abbott Laboratories...

437

Lawrence Livermore increases contracts awarded to small businesses...  

NLE Websites -- All DOE Office Websites (Extended Search)

standing in front of the NIF diagnostics that she works on. Photos by Julie KorhummelLLNL Lawrence Livermore increases contracts awarded to small businesses for third straight...

438

Contract Administration & Business Management | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Contract Administration & Business Management | National Nuclear Security Contract Administration & Business Management | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Contract Administration & Business Management Home > Field Offices > Welcome to the Sandia Field Office > Contract Administration & Business Management

439

Incorporating Non-energy Benefits into Energy Savings Performance Contracts  

E-Print Network (OSTI)

energy conservation measures State Virginia (2001) New Mexico (types of non-energy benefits. New Mexico (2011) has specificenergy savings contracts by governmental entities, June. New Mexico.

Larsen, Peter

2013-01-01T23:59:59.000Z

440

A number of organizations,  

E-Print Network (OSTI)

buying power to purchase green power. The city of Chicago has formed an alliance with 47 other local installed solar electric systems on a number of the city's buildings, including the Chicago Center for Green to competition, the city of Chicago and 47 other local government agencies formed the Local Government Power

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CHEMICAL SAFETY Emergency Numbers  

E-Print Network (OSTI)

- 1 - CHEMICAL SAFETY MANUAL 2010 #12;- 2 - Emergency Numbers UNBC Prince George Campus Security Prince George Campus Chemstores 6472 Chemical Safety 6472 Radiation Safety 5530 Biological Safety 5530 use, storage, handling, waste and emergency management of chemicals on the University of Northern

Bolch, Tobias

442

Disjunctive Rado numbers  

Science Conference Proceedings (OSTI)

If L1 and L2 are linear equations, then the disjunctive Rado number of the set {L1, L2} is the least integer n, provided that it exists, such that for every 2-coloring of ... Keywords: Rado, Ramsey, Schur, disjunctive

Brenda Johnson; Daniel Schaal

2005-11-01T23:59:59.000Z

443

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

National Nuclear Security Administration (NNSA)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

444

I l1. CONTRACT 10 CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

I I l1. CONTRACT 10 CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT 1 I 2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. IS. PROJECT NO. (If applicable) 218 See Block 16C 6 . ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) 05008 CODE 105008 NNSA/Oakridge Site Office NNSA/Oakridge Site Office U.S . Department of Energy U.S. Department of Energy NNSA/Y-12 Site Office NNSA/Y-12 Site Office P.O. Box 2050 P.O. Box 2050 301 Bear Creek Road 301 Bear Creek Road Building Building Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No., MI'H/. county. Stole /JIId ZIP Codo) 9A. AMENDMENT OF SOLICITATION NO. {xl f-- BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC Attn: WILLIE J. WILSON

445

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

446

CONTRACT NO. AT( 30-l)-541 ATOIKtC ENERGY CONMISSION CONTRACT  

Office of Legacy Management (LM)

^_ ^_ * ' . ;.j i: ' .3- $3 / . . This document consists of pages- No. of copies, Series CONTRACT NO. AT( 30-l)-541 ATOIKtC ENERGY CONMISSION CONTRACT CONTRACTOR A ADDRESS: COlJTRACT FOR: LOCATIONr AIR)~ OF INITIAL COMMISSION OBLIGATIONt ?AYMENT TO l3E VADE BYt BRIJSH BERYLLI?M COMPANY 4301 Perkins Avenue Cleveland 3, Ohio DESIGN, CONSTRUCTION AND OPmTION OF A YEW-LLIUMP~NT AND OTHER ACTIVITIES At or near Luckey, Ohio $900,000.00 Division of Disbursement, U. S. Treasury Department, New York, N. Y. (Submit invoices to: U. S. 9tamic Rnergy Commission, P, 0. Box 30, Ansonia Station, New York 23, New York.) i i . . . __- ._ ,. -. -.._... .-.-- m.4 _ . -.-I__ -... - --- - effective STAT'% OF 3ERYLLDJM THIS COmRACT, entered into the day as of the 1st day of February, 1949, by

447

From design through operations-Results from new construction performance contract and beyond  

SciTech Connect

As part of the High Performance Commercial Building Systems program, LBNL has been working with the City of Oakland to understand the ongoing performance of the Oakland Administration Buildings. The primary objective of this research is to understand the performance targets and ongoing performance of two buildings that were the subject of a new construction performance contract. Secondary objectives include examining the building performance information systems developed as part of the new construction performance contract and evaluating the role of the energy management and control system (EMCS) as a data acquisition tool to provide recommendations for future new construction projects. We examine the results of the performance contract in detail, and provide additional performance metrics that go beyond what was required in the performance contract. We found that the energy cost intensities (ECI) linked to the project ranged from $1.08/ft{sup 2} to $1.44/ft{sup 2}. Changes in floor area, energy costs, rate schedules, and energy use complicate the evaluation of the performance because of the lack of tracking of underlying data and assumptions. Overall, Oakland has two large office buildings with relatively low-energy use (50 kBtu/ft{sup 2}-yr site electricity and gas use). We compare this energy-use intensity with a number of related benchmarks. Additional end-use, HVAC performance, and diagnostics data are discussed.

Motegi, Naoya; Piette, Mary Ann; Wentworth, Scott

2002-05-17T23:59:59.000Z

448

South Dakota Natural Gas Number of Commercial Consumers (Number...  

Gasoline and Diesel Fuel Update (EIA)

View History: Annual Download Data (XLS File) South Dakota Natural Gas Number of Commercial Consumers (Number of Elements) South Dakota Natural Gas Number of Commercial Consumers...

449

South Dakota Natural Gas Number of Residential Consumers (Number...  

Annual Energy Outlook 2012 (EIA)

View History: Annual Download Data (XLS File) South Dakota Natural Gas Number of Residential Consumers (Number of Elements) South Dakota Natural Gas Number of Residential...

450

South Dakota Natural Gas Number of Industrial Consumers (Number...  

U.S. Energy Information Administration (EIA) Indexed Site

View History: Annual Download Data (XLS File) South Dakota Natural Gas Number of Industrial Consumers (Number of Elements) South Dakota Natural Gas Number of Industrial Consumers...

451

CONTRACTING AND ERUPTING COMPONENTS OF SIGMOIDAL ACTIVE REGIONS  

SciTech Connect

It has recently been noted that solar eruptions can be associated with the contraction of coronal loops that are not involved in magnetic reconnection processes. In this paper, we investigate five coronal eruptions originating from four sigmoidal active regions, using high-cadence, high-resolution narrowband EUV images obtained by the Solar Dynamic Observatory (SDO). The magnitudes of the flares associated with the eruptions range from GOES class B to class X. Owing to the high-sensitivity and broad temperature coverage of the Atmospheric Imaging Assembly (AIA) on board SDO, we are able to identify both the contracting and erupting components of the eruptions: the former is observed in cold AIA channels as the contracting coronal loops overlying the elbows of the sigmoid, and the latter is preferentially observed in warm/hot AIA channels as an expanding bubble originating from the center of the sigmoid. The initiation of eruption always precedes the contraction, and in the energetically mild events (B- and C-flares), it also precedes the increase in GOES soft X-ray fluxes. In the more energetic events, the eruption is simultaneous with the impulsive phase of the nonthermal hard X-ray emission. These observations confirm that loop contraction is an integrated process in eruptions with partially opened arcades. The consequence of contraction is a new equilibrium with reduced magnetic energy, as the contracting loops never regain their original positions. The contracting process is a direct consequence of flare energy release, as evidenced by the strong correlation of the maximal contracting speed, and strong anti-correlation of the time delay of contraction relative to expansion, with the peak soft X-ray flux. This is also implied by the relationship between contraction and expansion, i.e., their timing and speed.

Liu Rui; Wang Yuming [CAS Key Lab of Geospace Environment, Department of Geophysics and Planetary Sciences, University of Science and Technology of China, Hefei 230026 (China); Liu Chang; Wang Haimin [Space Weather Research Laboratory, Center for Solar-Terrestrial Research, NJIT, Newark, NJ 07102 (United States); Toeroek, Tibor, E-mail: rliu@ustc.edu.cn [Predictive Science Inc., 9990 Mesa Rim Road, Suite 170, San Diego, CA 92121 (United States)

2012-10-01T23:59:59.000Z

452

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

453

ELECTRICAL DISTRICT NUMBER EIGHT  

NLE Websites -- All DOE Office Websites (Extended Search)

ELECTRICAL DISTRICT NUMBER EIGHT ELECTRICAL DISTRICT NUMBER EIGHT Board of Directors Reply to: Ronald Rayner C. W. Adams James D. Downing, P.E. Chairman Billy Hickman 66768 Hwy 60 Brian Turner Marvin John P.O. Box 99 Vice-Chairman Jason Pierce Salome, AZ 85348 Denton Ross Jerry Rovey Secretary James N. Warkomski ED8@HARCUVARCO.COM John Utz Gary Wood PHONE:(928) 859-3647 Treasurer FAX: (928) 859-3145 Sent via e-mail Mr. Darrick Moe, Regional Manager Western Area Power Administration Desert Southwest Region P. O. Box 6457 Phoenix, AZ 85005-6457 moe@wapa.gov; dswpwrmrk@wapa.gov Re: ED5-Palo Verde Hub Project Dear Mr. Moe, In response to the request for comments issued at the October 6 Parker-Davis Project customer th meeting, and in conjunction with comments previously submitted by the Southwest Public Power

454

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

455

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

AMENDMENT/MODIFICATION NO AMENDMENT/MODIFICATION NO . 3. EFFECTIVE DATE 0232 See Block 16C 6. ISSUED BY CODE 05003 NNSA/Los Al amos Si t e Office U. S . Dep a rtme nt of Ene r gy Los Alamo s Sit e Off i ce 3747 We st Jemez Road Los Al a mos NM 87544 8. NAME AND ADDRESS OF CONTRACTOR (No. , street, county, State and ZIP Code) L A OS ALAMOS NAT I ONAL SECURI TY, ttn : STEVE K. SHOOK P.O . BOX 1663 , M S P222 L OS ALAMOS NM 875450001 CODE 175252894 LLC FACILITY CODE 11 . CONTRACT ID CODE I PAGE OF PAGES 1 I 2 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (ff applicable) 7. ADMINISTERED BY (ff other than Item 6) CODE 1 05003 NNSA/ Los Alamos S i te Office U. S . Departme n t of Energy Los Alamos Site Off ice 3747 W est J e me z Ro a d Los Alamos NM 875 4 4 (x) 9A. AMENDMENT OF SOLICITATION NO. - 9B. DATED (SEE ITEM 11)

456

Ocean energy contract list, fiscal year 1990  

DOE Green Energy (OSTI)

The purpose of the federal Ocean Energy Technology (OET) Program is to develop techniques that harness ocean energy (waves, currents, and thermal and salinity gradients) in a cost-effective and environmentally acceptable manner. The OET Program seeks to develop ocean energy technology to a point at which the commercial sector can assess whether applications of the technology are viable energy conversion alternatives or supplements to systems. The federal OET Program is conducted by DOE and is assigned to the Assistant Secretary for Conservation and Renewable Energy. Past studies conducted by the US Department of Energy (DOE) have identified ocean thermal energy conversion (OTEC) as the largest potential contributor to US energy supplies from the ocean resource. As a result, of the OET Program concentrates on research to advance OTEC technology. The FY 1990 contract overview comprises a list of all subcontracts begun, ongoing, or completed during FY 1990 (October 1, 1989, through September 30, 1990). Under each managing laboratory, projects are listed alphabetically by project area and then by subcontractor name.

Not Available

1991-08-01T23:59:59.000Z

457

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

NLE Websites -- All DOE Office Websites (Extended Search)

DATED (SEE ITEM 13) CODE 041152224 FACILITY CODE 12212005 11. THIS ITEM ONLY APPUES TO AMI:NDMENTS Of 50uCITATlON5 o The above numbered solicitation is amended as set forth in...

458

Sourcing Flexibility, Spot Trading, and Procurement Contract Structure  

Science Conference Proceedings (OSTI)

We analyze the structure and pricing of option contracts for an industrial good in the presence of spot trading. We combine the analysis of spot trading and buyers' disparate private valuations for different suppliers' products, and we jointly endogenize ... Keywords: contract pricing, procurement, supply chain management

Pamela Pen-Erh Pei; David Simchi-Levi; Tunay I. Tunca

2011-05-01T23:59:59.000Z

459

Identification of optimal contraction sequences for tensor networks  

E-Print Network (OSTI)

Tensor network Ansatze provide powerful tools for the study of quantum many-body systems on a lattice in the low-energy regime, representing the state of a system as an efficiently-contractible network of multi-index tensors optimised numerically by means of a variational algorithm. The efficient contraction of tensor networks is vital to both the development and the implementation of tensor network algorithms, but determination of optimal contraction sequences is presently performed by human operators in a process which is both tedious and prone to error. This paper presents an algorithm for exhaustively searching the space of contraction sequences on a practical timescale, automating the determination of both the optimal contraction sequence and the cost function associated with the contraction of a given tensor network. By removing the burden of computing these contraction sequences from the researcher, this tool both facilitates the development of novel efficiently-contractible tensor network Ansatze and assists in the optimal implementation of existing tensor network algorithms.

Robert N. C. Pfeifer

2013-04-22T23:59:59.000Z

460

Modeling strategic forward contracting in transmission constrained power markets  

Science Conference Proceedings (OSTI)

Taking the effects of transmission network into account, strategic forward contracting induced by the interaction of generation firms' strategies in the spot and forward markets is investigated. A two-stage game model is proposed to describe generation ... Keywords: equilibrium problem with equilibrium constraints (EPEC), nonlinear complementarity method, power market, strategic forward contracting

Wang Xian; Zhang Shaohua

2009-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Onsite Wastewater Treatment Systems: Homeowner's Guide to Evaluating Service Contracts  

E-Print Network (OSTI)

This guide helps homeowners who are seeking maintenance services for their onsite wastewater treatment systems (such as septic systems). Included are definitions of common terms used in service contracts, types of service contracts available, and factors to consider when choosing a service provider.

Lesikar, Bruce J.; O'Neill, Courtney; Deal, Nancy; Loomis, George; Gustafson, David; Lindbo, David

2008-10-23T23:59:59.000Z

462

Negotiating a Favorable Cogeneration Contract with your Utility Company  

E-Print Network (OSTI)

A relatively small cogenerator may find it difficult to negotiate a favorable cogeneration contract with a relatively large utility. This paper will tell prospective cogenerators some things they can do to make sure the contract they negotiate meets their energy needs while achieving their financial objectives.

Lark, D. H.; Flynn, J.

1985-05-01T23:59:59.000Z

463

Performance-Based Contracts for Outpatient Medical Services  

Science Conference Proceedings (OSTI)

In recent years, the performance-based approach to contracting for medical services has been gaining popularity across different healthcare delivery systems, both in the United States (under the name of pay for performance) and abroad (payment ... Keywords: healthcare, performance-based contracting, principal--agent theory, queueing theory

Houyuan Jiang; Zhan Pang; Sergei Savin

2012-10-01T23:59:59.000Z

464

Guidance to Completing the Self-Directed RBSM Interview Form | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review process and provide the reviewer with some of the rationale behind the questions that are asked. This companion piece does not emulate the exact order of the review process interview form but rather, attempts to address the major pathways that may be followed along the way to selecting a given disposition category. Guidance to Completing the Self-Directed RBSM Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and

465

Guidance to Completing the Self-Directed RBSM Interview Form | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form Guidance to Completing the Self-Directed RBSM Interview Form This guidance package is meant to be a companion piece for the self-directed RBSM Interview Form and describes the basic mechanics of the RBSM process. Examples are provided to clarify the review process and provide the reviewer with some of the rationale behind the questions that are asked. This companion piece does not emulate the exact order of the review process interview form but rather, attempts to address the major pathways that may be followed along the way to selecting a given disposition category. Guidance to Completing the Self-Directed RBSM Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and

466

Newport News Shipbuilding Company Interview re Ship Design Process  

E-Print Network (OSTI)

is not physical arrangement or its visualization, but the CFD analyses of hull/powerplant combinations (10 minutes vessels for foreign sale Landing craft Repair work Complex nuclear overhauls 4. Overview of the Ship Design Process 4.1. Coordinate system: Distance from bow or stern, measured in frame number, and distance

North Carolina at Chapel Hill, University of

467

DOE Announces Contracts to Achieve $140 Million in Energy Efficiency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracts to Achieve $140 Million in Energy Contracts to Achieve $140 Million in Energy Efficiency Improvements to DOE Facilities DOE Announces Contracts to Achieve $140 Million in Energy Efficiency Improvements to DOE Facilities August 4, 2008 - 2:40pm Addthis TEAM Energy-Savings Projects to Have Energy Improvements Pay for Themselves PHOENIX, Ariz. - U.S. Department of Energy (DOE) Deputy Assistant Secretary for Energy Efficiency David Rodgers today announced the first four Energy Savings Performance Contracts (ESPCs) to help the federal government save approximately $13 million on energy and energy-related costs per year. The contracts will also enable $140 million in energy efficiency improvements to DOE facilities, as part of the Department's Transformational Energy Action Management (TEAM) initiative. As part of the Bush Administration's

468

DOE Awards Hanford Site Law Enforcement Contract to Benton County |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awards Hanford Site Law Enforcement Contract to Benton County Awards Hanford Site Law Enforcement Contract to Benton County DOE Awards Hanford Site Law Enforcement Contract to Benton County December 20, 2012 - 12:00pm Addthis Media Contact Cameron Salony, DOE 509-376-0402, Cameron.Salony@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) today awarded a contract to the Benton County Sheriff's Office in Kennewick, Wash., to provide law enforcement services at the DOE Hanford Site. The contract has a five-year period of performance, consisting of a one-year base period, with four one-year option periods and an approximate total value of $5 million. As the law enforcement contractor, the sheriff's office will: Ensure site employees obey traffic laws Investigate suspected or reported violations of law Apprehend and arrest those suspected of committing violations of law

469

Diversifying Project Portfolios for Utility Energy Service Contracts |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Diversifying Project Portfolios for Utility Energy Service Diversifying Project Portfolios for Utility Energy Service Contracts Diversifying Project Portfolios for Utility Energy Service Contracts October 7, 2013 - 2:28pm Addthis Building a diversified project portfolio enhances utility energy service contracts (UESCs) to ensure Federal agencies get the best value possible. Energy efficiency measures are inherent in UESC projects. However, do not overlook the possibility for renewable energy and water efficiency and other conservation measures. Building a portfolio of energy service projects lowers overall contracting costs while increasing energy cost savings. This portfolio approach offers additional benefits by reducing contract and administrative burdens and optimizing energy savings. Renewable Energy Multiple laws and regulations require agencies to implement and use

470

DOE Seeks Small Businesses for Waste Tracking Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeks Small Businesses for Waste Tracking Contract Seeks Small Businesses for Waste Tracking Contract DOE Seeks Small Businesses for Waste Tracking Contract July 25, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Proposal (RFP) seeking Small Business Administration certified (8(a)) small business firms to provide DOE Transportation Tracking and Communications (TRANSCOM) Technical Support Services. A Requirements Contract will be awarded as a result of this RFP. The contract period of performance will be one year with four one-year option periods. The DOE TRANSCOM system continuously monitors and tracks active shipments of defense related spent nuclear fuel, radioactive/non-radioactive, hazardous, and transuranic (TRU) waste to and from DOE facilities. The

471

DOE Awards Small Business Contract for Site Characterization and Erosion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Characterization and Site Characterization and Erosion Control Work in Los Alamos, New Mexico DOE Awards Small Business Contract for Site Characterization and Erosion Control Work in Los Alamos, New Mexico September 30, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a new contract to CTI & Associates, of Wixom, MI. CTI is a small business. The Department will issue a time and material type contract with a three year period of performance and a not-to-exceed value of $2,249,264. Work performed under this contract will be performed at the contractor's facilities and at the Los Alamos National Lab in Los Alamos, NM. The work performed under this contract includes site characterization and

472

Department of Energy Awards Hanford River Corridor Contract To Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Awards Hanford River Corridor Contract To Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

473

DOE Awards Small Business Transportation Emergency Training Contract |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transportation Emergency Training Transportation Emergency Training Contract DOE Awards Small Business Transportation Emergency Training Contract March 1, 2011 - 12:00pm Addthis Media Contact Bill Taylor, 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati -- The Department of Energy (DOE) announced today a contract award to Technical Resources Group, Inc. (TRG), of Idaho Falls, Idaho. TRG, a small business that is also the incumbent contractor, will continue performing environmental consulting and training services for the Office of Environmental Management's (EM) Transportation Emergency Preparedness Program (TEPP). The new contract value is $4,034,666, with a six-month base period and options for up to five years, the renewed contract will begin April 1, 2011. Managed by the EM Office of Packaging and Transportation, TRG provides

474

New Online Marketplace for Small Business Contracting Launched by  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Online Marketplace for Small Business Contracting Launched by New Online Marketplace for Small Business Contracting Launched by Presidential Fellows New Online Marketplace for Small Business Contracting Launched by Presidential Fellows January 17, 2013 - 2:54pm Addthis John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization Editor's Note: This article was originally posted on the Small Business Administration's website. The U.S. Small Business Administration, in conjunction with the White House's Presidential Innovation Fellows, today launched a "beta" (pilot) version of RFP-EZ, a new online marketplace that streamlines the government contracting process, making it simpler for small businesses to find and bid on low-dollar contracts from federal agencies. The new program allows the government to source low-cost, high-impact

475

Federal Energy Management Program: Energy Savings Performance Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracts Contracts Getting Started Federal agencies new to the ESPC process should review the ESPC Overview, the FEMP Assistance Guide, and the FAQs. Case studies are also available. When you are ready to get started, contact a FEMP financing specialist. Energy savings performance contracts (ESPCs) allow Federal agencies to complete energy-savings projects without up-front capital costs and special Congressional appropriations. An ESPC is a partnership between a Federal agency and an energy service company (ESCO). The ESCO conducts a comprehensive energy audit of Federal facilities and identifies improvements to save energy. In consultation with the Federal agency, the ESCO designs and constructs a project that meets the agency's needs and arranges the necessary funding. The ESCO guarantees that the improvements will generate energy cost savings to pay for the project over the term of the contract (up to 25 years). After the contract ends, all additional cost savings accrue to the agency.

476

Energy Savings Performance Contract Case Studies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Funding » Energy Savings Performance Contracts » Energy Project Funding » Energy Savings Performance Contracts » Energy Savings Performance Contract Case Studies Energy Savings Performance Contract Case Studies October 7, 2013 - 1:53pm Addthis These case studies feature examples of projects made possible by the use of energy savings performance contracts (ESPCs). Bureau of Land Management (BLM) ESPC across Six States: BLM initiated lighting, HVAC, and other upgrades at remote facilities across six states as part of this successful ESPC. Dyess Air Force Base Water Conservation and Green Energy: Dyess Air Force Base leveraged an ESPC to implement water conservation and wind energy projects. Food and Drug Administration (FDA) White Oak Campus Environmental Stewardship and Cost Savings: The FDA White Oak Campus in Silver Spring,

477

Contracting Issues with Renewable Electricity | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracting Issues with Renewable Electricity Contracting Issues with Renewable Electricity Contracting Issues with Renewable Electricity October 16, 2013 - 5:08pm Addthis For many Federal agencies integrating renewable energy into a construction project, the technical and contracting issues associated with generating power at the facility are new. This page summarizes the various contracting issues that result from having on-site power generation that is actively interconnected with the power grid instead of using only a back-up generator. Many of these agreements depend on the ownership structure of the renewable energy system. Common agreements associated with a renewable electricity-generation facility include: An interconnection agreement covers the safe connection of the system to the power grid, including provisions for safe design, connection,

478

Department of Energy to Compete Management and Operating Contracts for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy to Compete Management and Operating Contracts Department of Energy to Compete Management and Operating Contracts for Three Office of Science Laboratories Department of Energy to Compete Management and Operating Contracts for Three Office of Science Laboratories November 17, 2006 - 9:25am Addthis WASHINGTON, DC -- The U.S. Department of Energy (DOE) announced today that it plans to begin competing the management and operating (M&O) contracts for three of its Office of Science national laboratories over the next 18 months. These competitions are part of DOE's policy to compete M&O contracts for DOE National Laboratories to ensure the greatest possible benefit to the Department of Energy and the American taxpayers. The laboratories to be competed and their current M&O contractors are Brookhaven National Laboratory (BNL) operated by Brookhaven Science

479

SPR Awards Exchange Contract to Shell Trading | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awards Exchange Contract to Shell Trading Awards Exchange Contract to Shell Trading SPR Awards Exchange Contract to Shell Trading May 10, 2007 - 12:55pm Addthis Deliveries to Begin in August WASHINGTON, DC - The U.S. Department of Energy (DOE) today awarded a contract to Shell Trading for exchange of 8.7 million barrels of royalty oil produced from the Gulf Coast for crude oil meeting the quality specifications of the Strategic Petroleum Reserve (SPR). The exchange oil will be delivered to two SPR sites, West Hackberry, Louisiana and Bryan Mound, Texas. The offer submitted by Shell Trading represented the highest value of specification-grade oil for the Reserve. Deliveries are expected to begin in August 2007 at a modest rate of approximately 50,000 barrels per day for a period of six months. The contract terms apply royalty-in-kind exchange provisions that require

480

DOE Awards Hanford Site Law Enforcement Contract to Benton County |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Law Enforcement Contract to Benton County Law Enforcement Contract to Benton County DOE Awards Hanford Site Law Enforcement Contract to Benton County December 20, 2012 - 12:00pm Addthis Media Contact Cameron Salony, DOE 509-376-0402, Cameron.Salony@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) today awarded a contract to the Benton County Sheriff's Office in Kennewick, Wash., to provide law enforcement services at the DOE Hanford Site. The contract has a five-year period of performance, consisting of a one-year base period, with four one-year option periods and an approximate total value of $5 million. As the law enforcement contractor, the sheriff's office will: Ensure site employees obey traffic laws Investigate suspected or reported violations of law Apprehend and arrest those suspected of committing violations of law

Note: This page contains sample records for the topic "interview contract number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Microsoft Word - ContractCoverPage 061108.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

MANAGEMENT MANAGEMENT AND OPERATING CONTRACT FOR THE LOS ALAMOS NATIONAL LABORATORY NATIONAL NUCLEAR SECURITY ADMINISTRATION CONTRACT NO. DE-AC52-06NA25396 DECEMBER 21, 2005 1943 Today Unofficial Conformed Copy as of 11/25/13 through Mod No. 248 U.S. DEPARTMENT OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION NNSA SERVICE CENTER- ALBUQUERQUE M&O CONTRACT SUPPORT DEPARTMENT PO BOX 5400, ALBUQUERQUE, NM 87185-5400 MICHAB: G. LOERA CONTRACTING OfFIC'Jf! PREVIOUS EDIT.ION IS UNUSABLE See Clause B-2 U.S. DEPARTMENT OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION NNSA SERVICE CENTER- ALBUQUERQUE ATIN: MICHAEL G. LOERA CONTRACTING OFFICER MAIL STOP: MOSD PO BOX 5400, ALBUQUERQUE, NM 87185-5400 DEC 2 1 2005 Prescribed by GSA FAR (48 CFR) 53.214(c)

482

Department of Energy Awards Hanford River Corridor Contract To Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford River Corridor Contract To Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

483

DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Assistance Contract for Moab Mill Tailings Technical Assistance Contract for Moab Mill Tailings Cleanup DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup May 31, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati-The U.S. Department of Energy (DOE) today announced the award of an $18 million small disadvantaged business contract with S&K Aerospace, LLC, of St. Ignatius, Montana to continue to provide technical assistance services for the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project in Moab, Utah. The basic contract is for three years with two one-year options to extend, for a total of up to five years. S&K Aerospace, LLC, a tribal organization 8(a) small business, will assist in the Department's removal of uranium tailings at the former Atlas

484

DOE Announces Contracts to Achieve $140 Million in Energy Efficiency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracts to Achieve $140 Million in Energy Contracts to Achieve $140 Million in Energy Efficiency Improvements to DOE Facilities DOE Announces Contracts to Achieve $140 Million in Energy Efficiency Improvements to DOE Facilities August 4, 2008 - 2:40pm Addthis TEAM Energy-Savings Projects to Have Energy Improvements Pay for Themselves PHOENIX, Ariz. - U.S. Department of Energy (DOE) Deputy Assistant Secretary for Energy Efficiency David Rodgers today announced the first four Energy Savings Performance Contracts (ESPCs) to help the federal government save approximately $13 million on energy and energy-related costs per year. The contracts will also enable $140 million in energy efficiency improvements to DOE facilities, as part of the Department's Transformational Energy Action Management (TEAM) initiative. As part of the Bush Administration's

485

EM Hosts Contract Performance and Management Workshop | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Performance and Management Workshop Contract Performance and Management Workshop EM Hosts Contract Performance and Management Workshop February 15, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday. The goal of the workshop was to identify opportunities to improve contract and project management with the objective of delivering results on time and within cost. In addition to DOE senior leadership, participants included corporate representatives from all EM large- and small-business prime cleanup and construction contractors. Deputy Secretary Daniel Poneman delivered the keynote address in a video message. Under Secretary for Nuclear Security Thomas D'Agostino attended the event. "Today's workshop with the corporate representatives provided an excellent

486

Energy Savings Performance Contracts Laws and Regulations | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savings Performance Contracts Laws and Regulations Savings Performance Contracts Laws and Regulations Energy Savings Performance Contracts Laws and Regulations October 7, 2013 - 1:42pm Addthis Legislation authorizing energy savings performance contracts (ESPCs) was enacted in 1992, and the U.S. Department of Energy (DOE) promulgated regulations for their use in 1995. ESPC authority was made permanent in 2007. National Energy Conservation Policy Act (NECPA) The National Energy Conservation Policy Act (NECPA) first gave Federal agencies the authority to enter into shared-energy savings contracts with private-sector energy service companies (ESCOs). It was superceded by the Energy Policy Act of 1992. Energy Policy Act of 1992 EPAct 1992 included the following provisions for ESPCs: Authorized Federal agencies to execute guaranteed-savings ESPCs

487

EM Hosts Contract Performance and Management Workshop | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hosts Contract Performance and Management Workshop Hosts Contract Performance and Management Workshop EM Hosts Contract Performance and Management Workshop February 15, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday. The goal of the workshop was to identify opportunities to improve contract and project management with the objective of delivering results on time and within cost. In addition to DOE senior leadership, participants included corporate representatives from all EM large- and small-business prime cleanup and construction contractors. Deputy Secretary Daniel Poneman delivered the keynote address in a video message. Under Secretary for Nuclear Security Thomas D'Agostino attended the event. "Today's workshop with the corporate representatives provided an excellent

488

LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting  

E-Print Network (OSTI)

The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

Skelton, K

2000-01-01T23:59:59.000Z

489

Department of Energy to Compete Management and Operating Contracts for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Operating Contracts and Operating Contracts for Three Office of Science Laboratories Department of Energy to Compete Management and Operating Contracts for Three Office of Science Laboratories November 17, 2006 - 9:25am Addthis WASHINGTON, DC -- The U.S. Department of Energy (DOE) announced today that it plans to begin competing the management and operating (M&O) contracts for three of its Office of Science national laboratories over the next 18 months. These competitions are part of DOE's policy to compete M&O contracts for DOE National Laboratories to ensure the greatest possible benefit to the Department of Energy and the American taxpayers. The laboratories to be competed and their current M&O contractors are Brookhaven National Laboratory (BNL) operated by Brookhaven Science

490

DOE Awards Hanford Site Occupational Medical Services Contract | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Occupational Medical Services Contract Occupational Medical Services Contract DOE Awards Hanford Site Occupational Medical Services Contract June 8, 2012 - 12:00pm Addthis Media Contact Cameron Hardy 509-308-4947 Cameron.hardy@rl.gov Cincinnati - The U.S. Department of Energy (DOE) announced today that HPM Corporation, of Kennewick, Washington has been awarded an estimated $99 million contract to provide Occupational Medical Services at the DOE Hanford Site. HPM is a certified minority-owned, women-owned small business. This is a two-year hybrid contract with four-one-year option periods that includes firm-fixed price with award fee, cost reimbursement, and Indefinite Delivery Indefinite Quantity (IDIQ) components. As the Occupational Medical Services Contractor, HPM Corporation will: Provide occupational medical services to approximately 8,000

491

Finite Neutrosophic Complex Numbers  

E-Print Network (OSTI)

In this book for the first time the authors introduce the notion of real neutrosophic complex numbers. Further the new notion of finite complex modulo integers is defined. For every $C(Z_n)$ the complex modulo integer $i_F$ is such that $2F_i = n - 1$. Several algebraic structures on $C(Z_n)$ are introduced and studied. Further the notion of complex neutrosophic modulo integers is introduced. Vector spaces and linear algebras are constructed using these neutrosophic complex modulo integers.

W. B. Vasantha Kandasamy; Florentin Smarandache

2011-11-01T23:59:59.000Z

492

"JUST THE MATHS" UNIT NUMBER  

E-Print Network (OSTI)

inequalities x 0, y 0, 3x + 2y 6 and x + y 4. 4. A mine manager has contracts to supply, weekly, 100 tons of grade 1 coal, 700 tons of grade 2 coal, 2000 tons of grade 3 coal, 4500 tons of grade 4 coal. Two seams

Davies, Christopher

493

Health Profile of California's Adolescents: Findings from the 2001 California Health Interview Survey  

E-Print Network (OSTI)

HEALTH PROFILE OF CALIFORNIAS ADOLESCENTS: FINDINGSFROM THE 2001 CALIFORNIA HEALTH INTERVIEW SURVEY UCLA CenterPopulation: U.S. and California, 2000 Exhibit 2. Adolescent

2005-01-01T23:59:59.000Z

494

The State of Health Insurance in California: Findings from the 2003 California Health Interview Survey  

E-Print Network (OSTI)

SUITE 300 LOS ANGELES, CALIFORNIA 90024 PHONE: (310) 794-Health Insurance California in Findingsfrom the 2003 California Health Interview Survey The State

Brown, E. Richard; Lavarreda, Shana Alex; Rice, Thomas; Kincheloe, Jennifer R.; al., et

2005-01-01T23:59:59.000Z

495

Diabetes in California: Findings from the 2001 California Health Interview Study  

E-Print Network (OSTI)

HEALTH POLICY RESEARCH DIABETES IN CALIFORNIA: FINDINGS FROMTHE 2001 CALIFORNIA HEALTH INTERVIEW SURVEY UCLA CENTER FORSUITE 300 LOS ANGELES, CALIFORNIA 90024 PHONE: (310) 794-

Diamant, Allison L.; Babey, Susan H.; Brown, E. Richard R; Chawla, Neetu

2003-01-01T23:59:59.000Z

496

The State of Health Insurance in California: Findings from the 2007 California Health Interview Survey  

E-Print Network (OSTI)

Suite 1550 Los Angeles, California 90024 Phone: 310.794.0909State of Health Insurance in California August 2009 Findingsfrom the 2007 California Health Interview Survey E. Richard

Brown, Richard E.; Kronick, Richard; Kincheloe, Jennifer R.; Lavarreda, Shana Alex; Peckham, Erin

2009-01-01T23:59:59.000Z

497

The State of Health Insurance in California: Findings from the 2005 California Health Interview Study  

E-Print Network (OSTI)

THE STATE OF HEALTH INSURANCE IN CALIFORNIA FINDINGS FROMTHE 2005 CALIFORNIA HEALTH INTERVIEW SURVEY JULY 2007 E.by grants from The California Endowment and The California

Brown, E. Richard; Lavarreda, Shana Alex; Ponce, Ninez; Yoon, Jean; al., et

2007-01-01T23:59:59.000Z

498

Curvature of the Lanthanide Contraction: An Explanation  

DOE Green Energy (OSTI)

A number of studies have shown that for isostructural series of the lanthanides (elements La through Lu), a plot of equivalent metal-ligand bond lengths versus atomic number differs significantly from linearity and can be better fit as a quadratic equation. However, for hydrogen type wave functions, it is the inverse of the average distance of the electron from the nucleus (an estimate of size) that varies linearly with effective nuclear charge. This generates an apparent quadratic dependence of radius with atomic number. Plotting the inverse of lanthanide ion radii (the observed distance minus the ligand size) as a function of effective nuclear charge gives very good linear fits for a variety of lanthanide complexes and materials. Parameters obtained from this fit are in excellent agreement with the calculated Slater shielding constant, k.

Raymond, Kenneth; Wellman, Daniel; Sgarlata, Carmelo; Hill, Aru

2009-12-21T23:59:59.000Z

499

Construction Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

North Execution - (2009 - 2011) North Execution - (2009 - 2011) Construction Project Number 2009 2010 2011 Project Description ANMLPL 0001C 76,675.32 - - Animas-Laplata circuit breaker and power rights CRGRFL 0001C - - 7,177.09 Craig Rifle Bay and transfer bay upgrade to 2000 amps; / Convert CRG RFL to 345 kV out of Bears Ear Sub FGE 0019C - - 39,207.86 Replace 69/25kV transformer KX2A at Flaming Gorge FGE 0020C - - 52,097.12 Flaming Gorge: Replace failed KW2A transformer HDN 0069C 16,638.52 208,893.46 3,704,578.33 Replace failed transformer with KZ1A 250 MVA 230/138kv

500

KPA Activity Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

supports CMM-SW Level 2 supports CMM-SW Level 2 Mapping of the DOE Systems Engineering Methodology to the Software Engineering Institute (SEI) Software Capability Maturity Model (CMM- SW) level 2. Date: September 2002 Page 1 KPA Activity Number KPA Activity SEM Section SME Work Product SQSE Web Site http://cio.doe.gov/sqse REQUIREMENTS MANAGEMENT RM-1 The software engineering group reviews the allocated requirements before they are incorporated in the software project. Chapter 3.0 * Develop High-Level Project Requirements Chapter 4.0 * Establish Functional Baseline * Project Plan * Requirements Specification Document * Requirements Management awareness * Defining Project Requirements RM-2 The software engineering group uses the allocated requirements as the basis for