Powered by Deep Web Technologies
Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

File:08-CA-b - CAISO Interconnection Request Process.pdf | Open...  

Open Energy Info (EERE)

Process.pdf Jump to: navigation, search File File history File usage Metadata File:08-CA-b - CAISO Interconnection Request Process.pdf Size of this preview: 463 599 pixels....

2

RidgenoseSolarInterconnectionProject  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cliffrose Solar Energy Interconnection Project DOEEA-1989 Western Area Power Administration (Western) is responding to a request from Longview Solar, LLC, to interconnect their...

3

Interconnection Panel  

Broader source: Energy.gov [DOE]

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the interconnection panel, including an overview of the generation interconnection process (GIP), and interconnection agreements and their terms.

4

Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Panel Dan Tunnicliff, P.E. Manager, Government Segment, Southern California Edison Southern California Edison Application Processing Technical Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Overview of Generation Interconnection Process (GIP) * Transmission Level Interconnections - Governed by CAISO Tariff. * Generally for 220 kV and higher. * All applications must be submitted to the CAISO. * CAISO administers its tariff, which is approved by FERC. * Distribution Level Interconnections - Governed by SCE's WDAT. * Generally below 220 kV. * All applications must be submitted to SCE. * SCE administers its tariff, which is approved by FERC. 2 Southern California Edison Interconnection agreements are critically

5

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Interconnect Issues in NE Serge Khalife, 15 th April 2010 Agenda  About National Grid and Service territories  Scope and definitions  Interconnection Process Overview  Time Frames and Fees  Governmental Entity Exceptions  Net Metering Limit  Technical Issues  Observations and recommendations  Questions and Answers Service Territories Map Scope and definitions  The Distributed Generation Group at National Grid process interconnection applications on the distribution system typically 10 MW and under with a few exceptions.  ISO-NE process larger interconnection applications on the transmission system. Their timelines and procedures vary from National Grid's Distributed Generation process.  Governmental Entity : The Commonwealth of Massachusetts, or any

6

Interconnection Resources  

Broader source: Energy.gov [DOE]

Interconnection is the technical procedures and legal requirements surrounding energy customers' ability to connect their small-scale renewable energy projects with the electricity grid. The...

7

Interconnection Standards  

Broader source: Energy.gov [DOE]

In July 2010, the Montana Public Service Commission (PSC) adopted interconnection rules, effective August 13, 2010. These rules apply to all electric utilities under the PSC's jurisdiction,...

8

Response from PJM Interconnection LLC and Pepco to Department...  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM...

9

Pepco and PJM Interconnection Comments on District of Columbia...  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM...

10

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decisions lay foundation for exception for utility contracts * Narrow exception GSA - Utility Interconnection Agreements * Application to Interconnection Agreements * Keys: Requirement for service Tariff or PSC action on contract

11

Hopper Interconnect  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interconnect Interconnect Interconnect jaguar xt4 Hopper's "Gemini" network is connected in a 3D torus. Description Hopper's compute nodes are connected via a custom high-bandwidth, low-latency network provided by Cray. The connectivity is in the form of a "mesh" in which each node is connected to other nearby nodes like strands in a fishing net, except that the mesh extends in three dimensions. Each network node handles not only data destined for itself, but also data to be relayed to other nodes. Nodes at the "edges" of the mesh network are connected to nodes at the other edge to form a 3-D torus. The custom chips that route communication over the network are known as "Gemini" and the entire network is often referred to as the "Cray Gemini

12

BPA?2012?00477?FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the proposed substation at Troutdale including the interconnection between the existing BPA substation to accommodate the proposed I-5 line Date range for this request from...

13

Advanced Interconnect Development  

SciTech Connect (OSTI)

The objectives of this project are to develop cost-effective, optimized materials for intermediate temperature SOFC interconnect and interconnect/electrode interface applications and identify and understand degradation processes in interconnects and at their interfaces with electrodes.

Yang, Z.G.; Maupin, G.; Simner, S.; Singh, P.; Stevenson, J.; Xia, G.

2005-01-27T23:59:59.000Z

14

Pepco and PJM Interconnection Comments on District of Columbia Public  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the Department of Energy on February 17, 2006. Potomac Electric Power Company and PJM Interconnection, L.L.C. jointly submit these comments and answer to the requests for rehearing submitted by the City of Alexandria, Virginia and the Director of the Virginia Department of Environmental Quality in the captioned proceeding . Pepco and PJM Interconnection Comments on District of Columbia Public

15

Learn More About Interconnections  

Broader source: Energy.gov [DOE]

North America is comprised of two major and three minor alternating current (AC) power grids or interconnections. The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic...

16

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-01-01T23:59:59.000Z

17

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-10-01T23:59:59.000Z

18

Microsoft Word - CX-Hardeson_Interconnection_23Sept2013.doc  

Broader source: Energy.gov (indexed) [DOE]

request. The proposed point of interconnection is at SnoPUD's existing Hardeson Substation. In order to integrate the proposed generation, BPA and SnoPUD would enter into...

19

Interconnection | Open Energy Information  

Open Energy Info (EERE)

Interconnection Interconnection Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some state’ standards apply only to investor-owned utilities, – not to municipal utilities and electric cooperatives. [1]

20

Western Interconnection Synchrophasor Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Synchrophasor measurements are a type of...

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Interconnect Issues in NE  

Broader source: Energy.gov [DOE]

Presentation covers interconnect issues in the Northeast and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

22

Perforation patterned electrical interconnects  

DOE Patents [OSTI]

This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

Frey, Jonathan

2014-01-28T23:59:59.000Z

23

North American Electric Reliability Corporation Interconnections...  

Broader source: Energy.gov (indexed) [DOE]

Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern,...

24

Solar cell array interconnects  

DOE Patents [OSTI]

Electrical interconnects are disclosed for solar cells or other electronic components using a silver-silicone paste or a lead-tin (Pb-Sn) no-clean fluxless solder cream, whereby the high breakage of thin (<6 mil thick) solar cells using conventional solder interconnect is eliminated. The interconnects of this invention employs copper strips which are secured to the solar cells by a silver-silicone conductive paste which can be used at room temperature, or by a Pb-Sn solder cream which eliminates undesired residue on the active surfaces of the solar cells. Electrical testing using the interconnects of this invention has shown that no degradation of the interconnects developed under high current testing, while providing a very low contact resistance value. 4 figs.

Carey, P.G.; Thompson, J.B.; Colella, N.J.; Williams, K.A.

1995-11-14T23:59:59.000Z

25

Response from PJM Interconnection LLC and Pepco to Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Docket No. EO-05-01: This letter will respond to your request for information concerning the potential need for Potomac River Station generation under the three reliability "scenarios" outlined by PJM and PEPCO. Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation More Documents & Publications Information Concerning Reliability Impacts under Various System

26

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, Wyoming  

Broader source: Energy.gov [DOE]

After the applicant withdrew its request to interconnect the proposed Hermosa West Wind Farm Project with Western Area Power Administrations transmission system, Western cancelled preparation of an EIS to evaluate the potential environmental impacts of the proposal.

27

Micro-fluidic interconnect  

SciTech Connect (OSTI)

An apparatus for simultaneously aligning and interconnecting microfluidic ports is presented. Such interconnections are required to utilize microfluidic devices fabricated in Micro-Electromechanical-Systems (MEMS) technologies, that have multiple fluidic access ports (e.g. 100 micron diameter) within a small footprint, (e.g. 3 mm.times.6 mm). Fanout of the small ports of a microfluidic device to a larger diameter (e.g. 500 microns) facilitates packaging and interconnection of the microfluidic device to printed wiring boards, electronics packages, fluidic manifolds etc.

Okandan, Murat (Albuquerque, NM); Galambos, Paul C. (Albuquerque, NM); Benavides, Gilbert L. (Los Ranchos, NM); Hetherington, Dale L. (Albuquerque, NM)

2006-02-28T23:59:59.000Z

28

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

29

Interconnection Standards | Open Energy Information  

Open Energy Info (EERE)

Interconnection Standards Interconnection Standards Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some states’ standards apply only to investor-owned utilities – not to municipal utilities and electric cooperatives. [1]

30

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Solar Wind Program Info State Nevada Program Type Interconnection Provider Public Utilities Commission of Nevada In December 2003, the Nevada Public Utilities Commission (PUC) adopted interconnection standards for customers of NV Energy (formerly Nevada Power and Sierra Pacific Power) with on-site generation up to 20 megawatts (MW) in capacity. These standards are largely consistent with IEEE 1547 standards, California's interconnection rule (California Rule 21) and the model interconnection agreement developed by the National Association of

31

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Energy Sources Solar Wind Program Info State Maine Program Type Interconnection Provider Maine Public Utilities Commission The Maine Public Utility Commission (PUC) adopted interconnection procedures in January 2010. These rules apply to all transmission and distribution utilities operating in the state and apply to all distribution generation (not just renewables). Maine's interconnection procedures, based in part on the Interstate Renewable Energy Council Inc. 2006 Model Interconnection Procedures,* identify four different tiers with

32

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Indiana Program Type Interconnection Provider Indiana Utility Regulatory Commission In November 2005, the Indiana Utility Regulatory Commission (IURC) approved rules governing the interconnection of distributed generation (DG). Indiana's interconnection rules require the state's investor-owned utilities to provide three levels of interconnection to customer-generators.

33

Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. |  

Broader source: Energy.gov (indexed) [DOE]

and Initial Comments of PJM Interconnection, and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. On January 5, 2009, ITC Transmission filed with the Department of Energy a request to amend Presidential Permit PP-230-3, which authorizes ITC to own and operate specified electric transmission facilities at the Bunce Creek station that interconnect ITC with Hydro One Networks Inc electric transmission facilities at the Michigan-Ontario border. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of

34

Webinar: Understanding the Interconnection and Transmission Service Queues  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Understanding the Interconnection and Transmission Service Webinar: Understanding the Interconnection and Transmission Service Queues Webinar: Understanding the Interconnection and Transmission Service Queues March 5, 2012 - 6:10pm Addthis This webinar will take place March 28, 2012, from 11 a.m.-12:30 p.m. MDT. Hosted by the U.S. Department of Energy's (DOE's) Office of Indian Energy Policy and Programs, DOE's Tribal Energy Program, the Environmental Protection Agency (EPA), and the Western Area Power Administration, this Web seminar will answer the following questions: What is the large generator interconnection procedure? How is transmission service requested? What does this mean for Tribes interested in gaining access to the transmission system? This is the fifth in a series of webinars that will run through September 2012.

35

interconnect | OpenEI  

Open Energy Info (EERE)

interconnect interconnect Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago) Keywords buildings carbon dioxide emissions carbon footprinting CO2 commercial buildings electricity emission factors ERCOT hourly emission factors interconnect nitrogen oxides NOx

36

Central American electrical interconnection  

SciTech Connect (OSTI)

A technical cooperation grant of $2.25 million, designed to strengthen the capacity of Central American countries to operate their regional interconnected electrical system, was announced by the Inter-American Development Bank (IDB). The grant, extended from the banks Fund for Special Operations, will help improve the capacity of the regions electric power companies to achieve economical, safe operation of the interconnected electric power systems. The funds will also be used to finance regional studies of the accords, procedures, regulations, and supervisory mechanisms for the system, as well as program development and data bases.

Not Available

1988-12-01T23:59:59.000Z

37

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Michigan Program Type Interconnection Provider Michigan Public Service Commission The Michigan Public Service Commission (PSC) first adopted interconnection standards for distributed generation (DG) in September 2003. The original standards provided for 5 levels of interconnection with cutoffs at 30 kilowatts (kW), 150 kW, 750 kW, and 2 megawatts (MW), but left many details

38

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Oregon Program Type Interconnection Provider Oregon Public Utility Commission Oregon has three separate interconnection standards: one for net-metered systems, one for small generator facilities (non-net metered systems) and one for large generator facilities (non-net metered systems). Oregon has also established separate net metering requirements and interconnection standards for the state's primary investor-owned utilities (PGE and

39

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State District of Columbia Program Type Interconnection Provider Washington Utilities and Transportation Commission In September 2007, the Washington Utilities and Transportation Commission (UTC) adopted interconnection standards for distributed generation (DG) systems up to 20 megawatts (MW) in capacity. The revised standards provide for two separate levels of interconnection based on system capacity. The

40

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Kentucky Program Type Interconnection Provider Kentucky Public Service Commission In April 2008, Kentucky enacted legislation which required the Kentucky Public Service Commission (PSC) to develop interconnection and net metering guidelines for all retail electric suppliers operating in Kentucky (excluding TVA utilities). The Kentucky PSC adopted those guidelines on January 8, 2009 (Order 2008-00169). The PSC's rules set forth a two-tiered approach to simplify the interconnection process:

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Wind Program Info State Maryland Program Type Interconnection Provider Maryland Public Service Commission In April 2007, Maryland enacted legislation ([http://mgaleg.maryland.gov/2007RS/chapters_noln/Ch_119_sb0595E.pdf S.B. 595]) requiring the Maryland Public Service Commission (PSC) to form a small generator interconnection working group to develop interconnection standards and procedures that are "consistent with nationally adopted

42

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New York Program Type Interconnection Provider New York State Department of Public Service New York first adopted uniform interconnection standards in 1999 (see history below). The Standard Interconnection Requirements (SIR) have subsequently been amended several times since, most recently with the adoption of far reaching revisions in February 2009. Several more minor

43

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Connecticut Program Type Interconnection Provider Public Utilities Regulatory Authority In December 2007, the Connecticut Department of Public Utility Control (DPUC) now called the Public Utilities Regulatory Authority (PURA) approved new interconnection guidelines for distributed energy systems up to 20 megawatts (MW) in capacity. Connecticut's interconnection guidelines apply to the state's two investor-owned utilities -- Connecticut Light and Power

44

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Energy Sources Solar Wind Program Info State Delaware Program Type Interconnection Provider Delaware Public Service Commission '''''Note: Delaware law ([http://delcode.delaware.gov/title26/c010/index.shtml#1014 26 Del. C. § 1014]) requires the Delaware Public Service Commission (PSC), Delaware Electric Cooperative (DEC), and municipal utilities to develop interconnection rules using as a guide the Interstate Renewable Energy Council's (IREC) model interconnection rules and the U.S. Department of

45

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Arizona Program Type Interconnection Provider Arizona Corporation Commission '''''Note: In June 2007, the Arizona Corporation Commission (ACC) initiated a rulemaking process to establish statewide interconnection standards for distributed generation (DG). This proceeding is still in progress. Until the new official rules go into effect, the commission has recommended that the utilities use the [http://images.edocket.azcc.gov/docketpdf/0000074361.pdf Interconnection

46

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Hawaii Program Type Interconnection Provider Hawaii Public Utilities Commission Hawaii has established simplified interconnection rules for small renewables and separate rules for all other distributed generation (DG). For inverter-based systems up to 10 kilowatts (kW) in capacity (and inverter-based DG under 250 kW on islands other than Kauai), there is a simple application process for interconnection. Systems must use inverters

47

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Pennsylvania Program Type Interconnection Provider Pennsylvania Public Utility Commission The Pennsylvania Public Utilities Commission was required to adopt interconnection standards and net-metering rules by the Alternative Energy Portfolio Standards Act of 2004.The PUC subsequently adopted interconnection standards for net-metered distributed generation (DG)

48

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State South Dakota Program Type Interconnection Provider S.D. Public Utilities Commission South Dakota's interconnection standards for distributed generation, adopted by the state Public Utilities Commission (PUC) in May 2009, apply to customers of investor-owned utilities.* The rules provide for four levels of interconnection for systems up to 10 megawatts (MW) in capacity:

49

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State North Carolina Program Type Interconnection Provider North Carolina Utilities Commission The North Carolina Utilities Commission (NCUC) adopted comprehensive interconnection standards for distributed generation in June 2008. The NCUC standards, which are similar to the Federal Energy Regulatory Commission's (FERC) interconnection standards for small generators,

50

VLSI interconnect Avinoam Kolodny  

E-Print Network [OSTI]

1000 10000 100000 Length [um] Power Local total Global total TOTAL globallocal Power Distribution by Wirelength · Total Dynamic Power · Global clock ­ not included · Local signals nets = 66% · Global signals global signals Total dynamic power (Gate, Diffusion and Interconnect) local clock global signals global

Kolodny, Avinoam

51

Reversible concentric ring microfluidic interconnects  

E-Print Network [OSTI]

A reversible, Chip-to-Chip microfluidic interconnect was designed for use in high temperature, high pressure applications such as chemical microreactor systems. The interconnect uses two sets of concentric, interlocking ...

Thompson, Mary Kathryn, 1980-

2004-01-01T23:59:59.000Z

52

North American Electric Reliability Corporation Interconnections...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

53

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Solar Wind Program Info State Iowa Program Type Interconnection Provider Iowa Utilities Board Different rules govern the interconnection of distributed generation facilities in Iowa, depending on whether or not the interconnection is with a utility whose rates are regulated by the Iowa Utilities Board (IUB). Rate regulated utilities include only the state's two investor-owned utilities -- MidAmerican Energy and Interstate Power and Light (IPL) -- and Linn

54

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State New Jersey Program Type Interconnection Provider New Jersey Board of Public Utilities New Jersey's interconnection standards apply statewide to all electric distribution utilities, but not to the small number of municipal utilities and electric cooperatives in the state. The rules, first adopted in 2001, have been revised several times since their inception, most recently in May 2012. The current standards include the following basic provisions:

55

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Nonprofit Residential Schools Utility Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Colorado Program Type Interconnection Provider Colorado Public Utilities Commission In December 2005, the Colorado Public Utilities Commission (PUC) adopted standards for net metering and interconnection, as required by Amendment 37, a renewable-energy ballot initiative approved by Colorado voters in November 2004. The PUC standards generally apply to utilities with 40,000 or more customers and all cooperative utilities.*

56

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Home Weatherization Wind Program Info State Florida Program Type Interconnection Provider Florida Public Service Commission In March 2008, the Florida Public Service Commission (PSC) adopted interconnection rules for renewable-energy systems up to two megawatts (MW) in capacity. The PSC rules apply only to the state's investor-owned utilities; the rules do not apply to electric cooperatives or municipal

57

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Program Info State Vermont Program Type Interconnection Provider Vermont Public Service Board Vermont has adopted separate interconnection standards for net-metered energy systems that are 150 kW or less, and for all other distributed-generation (DG) systems. '''Interconnection Standards for Net-Metered Systems 150 kW or less''' Vermont requires electric utilities to offer net metering to all customers with photovoltaic (PV) systems, wind-energy systems, fuel cells or

58

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Wisconsin Program Type Interconnection Provider Public Service Commission of Wisconsin In February 2004, the Wisconsin Public Service Commission adopted interconnection standards for distributed generation (DG) systems up to 15 megawatts (MW) in capacity. All investor-owned utilities (IOUs) and municipal utilities are required to abide by the standard provisions.

59

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State South Carolina Program Type Interconnection Provider Public Service Commission of South Carolina The South Carolina Public Service Commission (PSC) adopted simplified interconnection guidelines for small distributed generation (DG) in December 2006. These guidelines address renewable-energy systems and other forms of DG up to 20 kilowatts (kW) in capacity for residential systems,

60

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Texas Program Type Interconnection Provider Public Utility Commission of Texas The Texas Public Utility Regulatory Act (PURA) of 1999 included a provision that "a customer is entitled to have access to on-site distributed generation". As a result, the Public Utility Commission of Texas (PUCT) adopted interconnection standards in 1999. The rules apply to electrical generating facilities (consisting of one or more on-site distributed-generation units) located at a customer's point of delivery,

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Minnesota Program Type Interconnection Provider Minnesota Public Utilities Commission Minnesota's net-metering law, enacted in 1983, applies to all investor-owned utilities, municipal utilities and rural electric cooperatives. Qualifying facilities of less than 1,000 kilowatts (kW) are eligible for net metering. However, uniform interconnection regulations were not implemented when net metering was established.

62

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Industrial Residential Savings Category Bioenergy Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State Nebraska Program Type Interconnection Provider Nebraska Energy Office Nebraska enacted legislation in May 2009 [http://nebraskalegislature.gov/FloorDocs/101/PDF/Final/LB436.pdf (LB 436)], establishing general rules for interconnecting and net metering systems that generate electricity. Nebraska's policy applies to systems that use solar, wind, methane, biomass, hydropower or geothermal resources to produce electricity and have a rated capacity of 25 kilowatts (kW) or less. To be eligible, a facility must meet all applicable safety, performance,

63

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Solar Wind Program Info State Virginia Program Type Interconnection Provider Virginia State Corporation Commission Virginia has two interconnection standards: one for net-metered systems and one for systems that are not net-metered. '''Interconnection for Net-Metered Systems''' Customer-generators that net meter must comply with the interconnection rules within the regulations governing net metering (20 VAC 5-315-40). These rules apply to residential customers generating up to 10 kW* and commercial systems of up to 500 kW (or greater if the utility's net

64

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State New Hampshire Program Type Interconnection Provider New Hampshire Public Utilities Commission New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity using solar, wind, geothermal, hydro, tidal, wave, biomass, landfill gas, bio-oil or

65

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State Missouri Program Type Interconnection Provider Missouri Department of Natural Resources Missouri enacted legislation (S.B. 54) in June 2007 requiring all of the state's electric utilities -- including municipal utilities and electric cooperatives -- to offer net metering to customers with systems up to 100 kilowatts (kW) in capacity that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells

66

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New Mexico Program Type Interconnection Provider New Mexico Public Regulation Commission Interconnection in New Mexico is governed by New Mexico Public Regulation Commission (PRC) Rule 568 and Rule 569. These rules, adopted in July 2008, revised and clarified the state's existing rules. Rule 569 applies to all qualifying facilities (QFs) under PURPA, which generally includes all renewable-energy systems and combined-heat-and-power (CHP) systems up to 80

67

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Ohio Program Type Interconnection Provider Ohio Public Utilities Commission '''''Note: In July 2012, the Public Utilities Commission of Ohio (PUCO) opened a docket ([http://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=12-2051&x=0&y=0 Case 12-0251-EL-ORD]) to review the net metering and interconnection rules for investor-owned utilities. Details will be posted as more information is available.'''''

68

interconnect region | OpenEI  

Open Energy Info (EERE)

interconnect region interconnect region Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

69

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alternative Fuel Vehicles Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Utah Program Type Interconnection Provider Utah Public Service Commission Utah requires the state's only investor-owned utility, Rocky Mountain Power (RMP), and most electric cooperatives* to offer net metering to customers who generate electricity using solar energy, wind energy, hydropower, hydrogen, biomass, landfill gas, geothermal energy, waste gas or waste heat capture and recovery. The bill that established net metering also established some basic rules for interconnection. In April 2010, the Utah Public Service Commission (PSC) adopted final rules for interconnection. The rules described below took effect April 30, 2010.

70

Interconnection Agreements for Onsite Generation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Agreements Interconnection Agreements for Onsite Generation Office of Real Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception

71

Optically Interconnected MulticomputersUsing  

E-Print Network [OSTI]

Optically Interconnected MulticomputersUsing Inverted-GraphTopologies Tosuccessfullyexploitthebenefitsofopticaltechnologyinatightlycoupledmulticomputer, the architecturaldesignmust reflectboth the advantages and limitationsof optics. This article systems. Although optics have con- tributed dramatically to long-distance communi- cation and more

Krchnavek, Robert R.

72

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State California Program Type Interconnection Provider California Public Utilities Commission '''''Note: The California Public Utilities Commission (CPUC) approved a [http://docs.cpuc.ca.gov/EFILE/MOTION/162852.PDF proposed settlement] in September 2012, enacting the first fundamental redesign of Rule 21 since 2000. The complete revised Rule 21 Tariff, as described at a high level below, can be found beginning on page 136 of CPUC Decision 12-09-018. The individual tariffs adopted by the utilities can be found on the CPUC web

73

CAD implications of new interconnect technologies  

Science Journals Connector (OSTI)

This paper looks at the CAD implications of possible new interconnect technologies. We consider three technologies in particular: three dimensional ICs, carbon nanotubes as a replacement for metal interconnects, and optical interconnections for longer ... Keywords: 3D interconnect, On-chip optical, nanotubes

Louis K. Scheffer

2007-06-01T23:59:59.000Z

74

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Broader source: Energy.gov (indexed) [DOE]

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

75

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

76

Learn More About Interconnections | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Learn More About Learn More About Interconnections Learn More About Interconnections Learn More About Interconnections EASTERN INTERCONNECTION North America is comprised of two major and three minor alternating current (AC) power grids or "interconnections." The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic coast (excluding Québec), South to Florida and West to the foot of the Rockies (excluding most of Texas). All of the electric utilities in the Eastern Interconnection are electrically tied together during normal system conditions and operate at a synchronized frequency operating at an average of 60Hz. Click here for more information. DOE is in the process of issuing awards to two entities in the Eastern Interconnection: one to the Eastern Interconnection Planning

77

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State West Virginia Program Type Interconnection Provider West Virginia Public Service Commission In 2006, West Virginia stakeholders came together to consider net metering, interconnection as required by the Federal Energy Policy Act (2005) and agreed upon a "Statement of Consensus Among Parties," which was presented to and accepted by the West Virginia Public Service Commission (PSC) in December 2006. The consensus agreement did include interconnection guidelines for the state, however, the PSC did not initiate a formal rule-making or incorporate the guidelines into agency rules. Rather, the

78

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

General Public/Consumer General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Arkansas Program Type Interconnection Provider Arkansas Public Service Commission In April 2001, Arkansas enacted legislation directing the Arkansas Public Service Commission (PSC) to establish net-metering rules for certain renewable-energy systems. The Arkansas Public Service Commission (PSC) adopted net-metering rules in July 2002 (Order No. 02-046-R). Section 3 applies to the interconnection of net-metered facilities to existing electric power systems.* Systems that generate electricity using solar, wind, hydro, geothermal and biomass resources are eligible to interconnect

79

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bioenergy Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Kansas Program Type Interconnection Provider Kansas Corporation Commission Kansas adopted the Net Metering and Easy Connection Act in May 2009 (see K.S.A. 66-1263 through 66-1271), establishing interconnection guidelines and net metering for customer-owned generators. Net metering and the accompanying interconnection guidelines apply to systems that generate electricity using solar, wind, methane, biomass or hydro resources, and to fuel cells using hydrogen produced by an eligible renewable technology, with a rated capacity of 25 kilowatts (kW) or less for residential customers, 200 kW or less for non-residential customers and 1.5 megawatts

80

GSA-Utility Interconnection Agreements  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception - B-197583, January 19, 1981 GSA - Utility Interconnection Agreements

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Louisiana Program Type Interconnection Provider Louisiana Public Service Commission '''''Note: Ongoing proceedings related to net metering can be found in [http://lpscstar.louisiana.gov/star/portal/lpsc/page/Dockets/portal.aspx Docket R-31417.]''''' The Louisiana Public Service Commission (PSC) adopted rules for net metering and interconnection in November 2005. Louisiana's rules, based on those in place in Arkansas, require publicly-owned utilities and rural electric cooperatives to offer net metering to customers with systems that generate electricity using solar, wind, hydropower, geothermal or biomass

82

Interconnection Guidelines (Rhode Island) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Rhode Island Program Type Interconnection Provider Rhode Island Public Utilities Commission Rhode Island enacted legislation (HB 6222) in June 2011 to standardize the application process for the interconnection of customer-sited renewable-energy systems to the state's distribution grid. Rhode Island's interconnection policy is not nearly as comprehensive as

83

New Report Characterizes Existing Offshore Wind Grid Interconnection...  

Office of Environmental Management (EM)

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities September 3,...

84

PJM Interconnection (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Interconnection PJM (originally Pennsylvania, Jersey, Maryland) Interconnection is a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. The PJM region has an area of 214,000 square miles, a population of about 60 million and a peak demand of 163,848 megawatts

85

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Wind Program Info State Georgia Program Type Interconnection Provider Georgia Public Service Commission The Georgia Cogeneration and Distributed Generation Act of 2001 allows residential electricity customers with photovoltaic (PV) systems, wind-energy systems or fuel cells up to 10 kilowatts (kW) in capacity, and commercial facilities up to 100 kW, to connect to the grid. The aggregate capacity of distributed generation systems is limited to 0.2% of a utility's system peak demand from the previous year. Interconnected customers must comply with all relevant national standards,

86

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

System C. Dyadic Green's Functions 1. TM and TE Decomposition 2. Transmission-Line Green's Functions . NUiVIERICAL PROCEDURES . A. Basis functions and testing procedure . 1. Interconnect of Microstrip Lines 2. Slot-Coupled Microstrip Dipole . 3... data of return loss on the 20 GHz slot-coupled rect- angular patch antenna. . FIG URE Pa. ge 28 Typical transmission line section containing a 1A current source. . . 68 CHAPTER I INTRODUCTION Many studies on slot-coupled microstrip antennas have...

Luong, Giam-Minh

2012-06-07T23:59:59.000Z

87

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

88

Funeral Leave Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FUNERAL LEAVE REQUEST (Supplement to Annual or Sick Leave Request) Employee's Name (Please Print) Date Request Submitted: Name of deceased family member: Relationship: Place of death:

89

Puerto Rico - Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Autoridad de Energía Electrica de Puerto Rico In 2007, the Autoridad de Energía Electrica de Puerto Rico (PREPA*) adopted interconnection standards based on the standard contained in the federal Energy Policy Act of 2005. PREPA promulgated interconnection rules in August 2008 that apply to all distributed generation (DG) projects that

90

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Broader source: Energy.gov (indexed) [DOE]

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

91

Information Request  

Broader source: Energy.gov (indexed) [DOE]

November 25, 2008 November 25, 2008 TO: Sue Tierney, Phil Niedzielski-Eichner, Skila Harris FROM: Chris Kouts SUBJECT: Information Request As requested, enclosed is the additional information you requested yesterday. 1. Testimony: * September 24, 2008 before the Senate Committee on Commerce, Science and Transportation, * July 15, 2008 before the House Committee on Energy and Commerce * October 4, 2007 before the House Committee on the Budget and Chairman Spratt 2. Proposed Legislation "Nuclear Fuel Management and Disposal Act" submitted to Congress March 6, 2007 3. State-by-State Maps that outline each state's electricity generation mix, commercial spent nuclear fuel inventories, and payments into the Nuclear Waste Fund The additional information on the history of the use of engineered barriers will be

92

Distributed PV Interconnection Screening Procedures and Online...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools" 30 mins. Q&Adiscussion Upcoming Meeting: September 24, 2014 Highlights of SunShot Projects: Interconnection as Part of a Strategic Resource Planning Process Alison...

93

Recent Development of SOFC Metallic Interconnect  

SciTech Connect (OSTI)

Interest in solid oxide fuel cells (SOFC) stems from their higher eciencies and lower levels of emitted pollu- tants, compared to traditional power production methods. Interconnects are a critical part in SOFC stacks, which connect cells in series electrically, and also separate air or oxygen at the cathode side from fuel at the anode side. Therefore, the requirements of interconnects are the most demanding, i:e:, to maintain high elec- trical conductivity, good stability in both reducing and oxidizing atmospheres, and close coecient of thermal expansion (CTE) match and good compatibility with other SOFC ceramic components. The paper reviewed the interconnect materials, and coatings for metallic interconnect materials.

Wu JW, Liu XB

2010-04-01T23:59:59.000Z

94

Updating Interconnection Screens for PV System Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Abraham Ellis, Roger Hill Sandia National Laboratories Tom Key, Kristen Nicole, Jeff Smith Electric Power Research Institute Updating Interconnection Screens for PV System...

95

Generation Interconnection and Deliverability Allocation Procedures...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Generation Interconnection and Deliverability Allocation ProceduresLegal Abstract Generation...

96

Durability of Metallic Interconnects and Protective Coatings  

SciTech Connect (OSTI)

To build up a useful voltage, a number of solid oxide fuel cells (SOFCs) are electrically connected into series in a stack via interconnects, which are placed between adjacent cells. In addition to functioning as a bi-polar electrical connector, the interconnect also acts as a separator plate that separates the fuel at the anode side of one cell from the air at the cathode side on an adjacent cell. During SOFC operation at the high temperatures, the interconnects are thus simultaneously exposed to the oxidizing air at one side and a reducing fuel that can be either hydrogen or hydrocarbon at the other. Besides, they are in contact with adjacent components, such as electrodes or electrical contacts, seals, etc. With steady reduction in SOFC operating temperatures into the low or intermediate range 600-850oC, oxidation resistant alloys are often used to construct interconnects. However, the metallic interconnects may degrade via interactions at their interfaces with surrounding environments or adjacent components, potentially affecting the stability and performance of interconnects and the SOFC stacks. Thus protection layers are applied to metallic interconnects that also intend to mitigate or prevent chromium migration into cells and the cell poisoning. This chapter provides a comprehensive review of materials for metallic interconnects, their degradation and coating protection.

Yang, Zhenguo; Stevenson, Jeffry W.

2009-12-15T23:59:59.000Z

97

Updating Technical Screens for PV Interconnection: Preprint  

SciTech Connect (OSTI)

Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlined as possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG. However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnection process. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

Coddington, M.; Ellis, A.; Lynn, K.; Razon, A.; Key, T.; Kroposki, B.; Mather, B.; Hill, R.; Nicole, K.; Smith, J.

2012-08-01T23:59:59.000Z

98

FPGA Interconnect Delay Fault Testing Erik Chmelar  

E-Print Network [OSTI]

A satisfactory FPGA testing method meets several crite- ria. First, the routing resources must be explicitlyFPGA Interconnect Delay Fault Testing Erik Chmelar Center for Reliable Computing Stanford is a scalable manufactur- ing test method for all SRAM-based FPGAs, able to detect multiple interconnect delay

Stanford University

99

Personal Information Request Request for Personal Information  

E-Print Network [OSTI]

Personal Information Request Request for Personal Information Request for Correction of Personal Information Personal information on this form is collected under Newfoundland and Labrador's Access to Information and Protection of Privacy (ATIPP) Act and will be used to respond to a request for, or correction

deYoung, Brad

100

Information Request | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Request Information Request Information Request, November 25, 2008, Testimony, RWAdditionalInformation.pdf Information Request More Documents & Publications The Report To The...

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

102

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

103

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave...  

Broader source: Energy.gov (indexed) [DOE]

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona SUMMARY DOE's...

104

Renewable Generation and Interconnection to the Electrical Grid...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Renewable Generation and Interconnection to the Electrical Grid in Southern California Renewable Generation and Interconnection to the Electrical Grid in Southern California...

105

Power Consumption and Scalability of Optically Switched Interconnects  

Science Journals Connector (OSTI)

We analyzed three realizations of optically switched interconnects regarding power consumption and scalability. The optically switched interconnects provide higher power efficiency...

Fehratovic, Naida; Aleksic, Slavisa

106

New_Contractor_Information_for_Interconnection_Security_Agreement...  

Broader source: Energy.gov (indexed) [DOE]

NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforIntercon...

107

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt...  

Energy Savers [EERE]

Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska SUMMARY DOE's Western Area...

108

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona SUMMARY DOE's...

109

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

A, A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

110

PJM Interconnection, LLC | Open Energy Information  

Open Energy Info (EERE)

PA References: SGIC1 This article is a stub. You can help OpenEI by expanding it. PJM Interconnection, LLC Smart Grid Project was awarded 13,698,091 Recovery Act Funding...

111

Carbon nanotube synthesis for integrated circuit interconnects  

E-Print Network [OSTI]

Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

Nessim, Gilbert Daniel

2009-01-01T23:59:59.000Z

112

NREL Variability Analysis for the Western Interconnect (Presentation)  

SciTech Connect (OSTI)

This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

113

Accelerating Fatigue Testing for Cu Ribbon Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation describes fatigue experiments and discusses dynamic mechanical loading for Cu ribbon interconnects.

Bosco, N.; Silverman, T.; Wohlgemuth , J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shioda, T.; Zenkoh, H.; Miyashita, M.; Tadanori, T.; Suzuki, S.

2013-05-01T23:59:59.000Z

114

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

115

Committed regional electrical interconnection projects in the Middle East  

SciTech Connect (OSTI)

Due to the well-known advantages of electrical interconnections and their consequent benefits, Jordan considers the interconnection of its electrical network with the neighboring electrical networks as one of its main corporate strategies. At present the electrical interconnection project of the networks of Egypt, Iraq, Jordan, Syria, and Turkey is progressing. To achieve this interconnection project, two feasibility studies were conducted: interconnection of the Egyptian and Jordanian electrical power systems; interconnection of the electrical networks of Egypt, Iraq, Jordan, Syria, and Turkey (EIJST interconnection). This presentation reviews these studies and their results.

Azzam, M.; Al-Said, A.

1994-12-01T23:59:59.000Z

116

ENERGY EXCEPTION REQUEST Energy Exception Request Questionnaire  

E-Print Network [OSTI]

ENERGY EXCEPTION REQUEST Energy Exception Request Questionnaire rev AA.01 2013/04/02 GUIDELINES which exceed the normal schedule by completing this Energy Exception Request and submitting it to the Office of Energy Management. Energy Management will prepare a cost analysis and return

Rock, Chris

117

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

118

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Cooperation Among States in the Western Interconnection on Electric Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

119

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

120

REQUESTS FOR RETIREMENT ESTIMATE  

Broader source: Energy.gov (indexed) [DOE]

REQUEST FOR RETIREMENT ANNUITY ESTIMATE REQUEST FOR RETIREMENT ANNUITY ESTIMATE Instructions: Please read and answer the following questions thoroughly to include checking all applicable boxes. Unanswered questions may delay processing. Print and Fax back your request form to 202.586.6395 or drop request to GM-169. The request will be assigned to your servicing retirement specialist. They will confirm receipt of your request. SECTION A Request Submitted _____________________ ______________________ ________________________ _____________________ Name (last, first, middle) Last four SSN Date of Birth ___________________________ _________________________ __________________________ Organization Office Telephone Number Fax Number

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE/EIS-0183: Record of Decision for the Electrical Interconnection of the Shepherds Flat Wind Energy Project (07/18/08)  

Broader source: Energy.gov (indexed) [DOE]

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project July 2008 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind

122

CX-010577: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration

123

Regulation and investment under uncertainty: An application to power grid interconnection  

E-Print Network [OSTI]

An Application to Power Grid Interconnection. Jean-Danielto the Ontario power grid. This interconnection will allowfor our application to a power grid interconnection. Second,

Saphores, Jean-Daniel M; Gravel, E; Bernard, J T

2004-01-01T23:59:59.000Z

124

Original Paper Fully interconnected, linear control  

E-Print Network [OSTI]

Original Paper Fully interconnected, linear control for limit cycle walking Joseph H Solomon1 and simple control methodologies for these models (Collins & Ruina, 2005; Hobbelen & Wisse, 2008a, 2008b. Corresponding author: Joseph H. Solomon, Northwestern University, Department of Mechanical Engineering, 2145

Hartmann, Mitra J. Z.

125

Electric network interconnection of Mashreq Arab Countries  

SciTech Connect (OSTI)

Power system interconnection is a well established practice for a variety of technical and economical reasons. Several interconnected networks exist worldwide for a number of factors. Some of these networks cross international boundaries. This presentation discusses the future developments of the power systems of Mashreq Arab Countries (MAC). MAC consists of Bahrain, Egypt, Iraq, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, United Arab Emirates (UAE), and Yemen. Mac power systems are operated by government or semigovernment bodies. Many of these countries have national or regional electric grids but are generally isolated from each other. With the exception of Saudi Arabia power systems, which employ 60 Hz, all other MAC utilities use 50 Hz frequency. Each country is served by one utility, except Saudi Arabia, which is served by four major utilities and some smaller utilities serving remote towns and small load centers. The major utilities are the Saudi Consolidated electric Company in the Eastern Province (SCECO East), SCECO Center, SCECO West, and SCECO South. These are the ones considered in this study. The energy resources in MAC are varied. Countries such as Egypt, Iraq, and Syria have significant hydro resources.The gulf countries and Iraq have abundant fossil fuel, The variation in energy resources as well as the characteristics of the electric load make it essential to look into interconnections beyond the national boundaries. Most of the existing or planned interconnections involve few power systems. A study involving 12 countries and over 20 utilities with different characteristics represents a very large scale undertaking.

El-Amin, I.M.; Al-Shehri, A.M.; Opoku, G.; Al-Baiyat, S.A.; Zedan, F.M.

1994-12-01T23:59:59.000Z

126

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Broader source: Energy.gov (indexed) [DOE]

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

127

seca-core-tech-sofc-interconnect | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Developmental SOFC Interconnect Alloys PDF-1.2MB - M.P. Brady, B.A. Pint, T.R. Armstrong Products Bulk Alloy Breakout Team PDF-92KB Interconnect-Electrode Interface...

128

Fast high-order variation-aware IC interconnect analysis  

E-Print Network [OSTI]

Interconnects constitute a dominant source of circuit delay for modern chip designs. The variations of critical dimensions in modern VLSI technologies lead to variability in interconnect performance that must be fully accounted for in timing...

Ye, Xiaoji

2009-05-15T23:59:59.000Z

129

National Offshore Wind Energy Grid Interconnection Study (NOWEGIS)  

Broader source: Energy.gov [DOE]

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States.

130

High temperature solid electrolyte fuel cell configurations and interconnections  

DOE Patents [OSTI]

High temperature fuel cell configurations and interconnections are made including annular cells having a solid electrolyte sandwiched between thin film electrodes. The cells are electrically interconnected along an elongated axial outer surface.

Isenberg, Arnold O. (Forest Hills, PA)

1984-01-01T23:59:59.000Z

131

Solar Energy to Benefit from New FERC Interconnection Procedures...  

Energy Savers [EERE]

Solar Energy to Benefit from New FERC Interconnection Procedures Solar Energy to Benefit from New FERC Interconnection Procedures October 30, 2014 - 5:15pm Addthis As a major win...

132

Voltage Collapse SimulationVoltage Collapse Simulation (Eastern Interconnection(Eastern Interconnection  

E-Print Network [OSTI]

of 2003 that is available on the PSERC web site, http://pserc.org. 2 #12;Symbols in the Simulation Window · Buses: heavy dark lines where the generators, loads and transmission lines interconnect · Transmission

133

FOIA Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

You are here: DOEID Home > FOIA > FOIA Request Form You are here: DOEID Home > FOIA > FOIA Request Form U.S. Department of Energy Idaho (DOE-ID) Operations Office Electronic FOIA Request Form* To make an Electronic FOIA (E-FOIA) request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. For individuals making a request for personal records under FOIA or the Privacy Act, please fill out the Privacy Act Request Form ( This link opens an 14 kb size Adobe Acrobat File 15 kb), print out the form and have your identity validated by having the form notarized and send the form to DOE-Idaho Privacy Officer, 1955 Freemont Avenue, Mail Stop 1203, Idaho Falls, ID 83405. * Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form.

134

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Aggregator Programs. Demand Response Measurement andIncorporating Demand Response into Western Interconnection13 Demand Response Dispatch

Satchwell, Andrew

2014-01-01T23:59:59.000Z

135

Electrically long vertical interconnects for microwave circuits and antennas  

E-Print Network [OSTI]

. . . . . 2 . . . . 3 . . . . 4 . 4 . 4 . 5 . . . . 5 . . . . 6 . . . . 7 A. Transmission Line Interconnects. . B. Electromagnetically Coupled lnterconnects . . . . . C. Conclusions . . . . . . 8 . . . 10 III FIDELITY SIMULATION 12 A. B. C. D... interconnects satisfying specifications set by Raytheon Systems Co. This research was sponsored by Raytheon Systems Co. RF/Microwave Division. A vertical interconnect couples transmission lines, antennas, and components between vertically spaced layers...

Coutant, Matthew Richard

2012-06-07T23:59:59.000Z

136

Interconnection Standards for Small Generators | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards for Small Generators Interconnection Standards for Small Generators Interconnection Standards for Small Generators < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) adopted "small generator" interconnection standards for distributed energy resources up to 20 megawatts (MW) in capacity in May 2005.* The FERC's standards apply only to facilities subject to the jurisdiction of the commission; these facilities

137

Request For Records Disposition | Department of Energy  

Office of Environmental Management (EM)

Request For Records Disposition Request For Records Disposition Southeastern Power Administration (SEPA) Request For Records Disposition More Documents & Publications Audit...

138

Eastern Interconnection Planning Collaborative News Release  

Broader source: Energy.gov (indexed) [DOE]

1 1 NEWS RELEASE FOR IMMEDIATE RELEASE May 23, 2011 Contact: David Whiteley d.a.whiteley@att.net 314-753-6200 Eastern Interconnection Grid Planning Authorities to Study Set of Stakeholder-Identified Electric System Futures The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a major step forward with the stakeholder-defined specifications for the resource futures to be considered in the macroeconomic analysis in Phase I of the Project. The stakeholders are to be congratulated for their hard work in achieving a

139

Frequency Instability Problems in North American Interconnections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Frequency Instability Problems in Frequency Instability Problems in North American Interconnections May 1, 2011 DOE/NETL-2011/1473 Frequency Instability Problems in North American Interconnections Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

140

Interconnection of bundled solid oxide fuel cells  

DOE Patents [OSTI]

A system and method for electrically interconnecting a plurality of fuel cells to provide dense packing of the fuel cells. Each one of the plurality of fuel cells has a plurality of discrete electrical connection points along an outer surface. Electrical connections are made directly between the discrete electrical connection points of adjacent fuel cells so that the fuel cells can be packed more densely. Fuel cells have at least one outer electrode and at least one discrete interconnection to an inner electrode, wherein the outer electrode is one of a cathode and and anode and wherein the inner electrode is the other of the cathode and the anode. In tubular solid oxide fuel cells the discrete electrical connection points are spaced along the length of the fuel cell.

Brown, Michael; Bessette, II, Norman F; Litka, Anthony F; Schmidt, Douglas S

2014-01-14T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Definition: Interconnection Reliability Operating Limit Tv | Open Energy  

Open Energy Info (EERE)

Limit Tv Limit Tv Jump to: navigation, search Dictionary.png Interconnection Reliability Operating Limit Tv The maximum time that an Interconnection Reliability Operating Limit can be violated before the risk to the interconnection or other Reliability Coordinator Area(s) becomes greater than acceptable. Each Interconnection Reliability Operating Limit's Tv shall be less than or equal to 30 minutes.[1] Related Terms Interconnection Reliability Operating Limitinterconnection, interconnection References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interconnection_Reliability_Operating_Limit_Tv&oldid=493031

142

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie

143

Performance testing of small interconnected wind systems  

SciTech Connect (OSTI)

There is a need for performance information on small windmills intended for interconnected operation with utility distribution service. The owner or prospective buyer needs the data to estimate economic viability and service reliability, while the utility needs it to determine interconnection arrangements, maintain quality of power delivered by its line, and to answer customer inquiries. No existing testing program provides all the information needed, although the Rocky Flats test site comes close. To fill this need for Michigan, Consumers Power Company and the Michigan Electric Cooperative Association helped support a two-year program at Michigan State University involving extensive performance testing of an Enertech 1500 and a 4-kW Dakota with a Gemini inverter. The performance study suggested measurements necessary to characterize SWECS for interconnected operation. They include SWECS energy output to a-c line, miles of wind passing the rotor, var-hour metering for average var consumption, and recording watt, current, and voltmeters to assess SWECS output variability. Added instruments for waveform measurement (to assess power quality) are also needed. Typical data taken at the MSU test site are used to illustrate the techniques and preliminary data from a current project is given. Finally, conclusions about SWECS performance are listed.

Park, G.L.; Krauss, O.; Miller, J.

1984-05-01T23:59:59.000Z

144

Visitor Hanford Computer Access Request - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Visitor Hanford Computer Access Request Visitor Hanford Computer Access Request Visitor Hanford Computer Access Request Visitor Hanford Computer Access Request Email Email Page |...

145

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Broader source: Energy.gov (indexed) [DOE]

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

146

WIPP - Frequently Requested Records  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FOIA Quick Links FOIA Home Page What is a FOIA? How to Submit A FOIA Request Cost of a FOIA Request Electronic FOIA Request Form FOIA Annual Reports FOIA Public Reading Facilities/Electronic Reading Facilities FOIA Requester Service Centers and FOIA Public Liaisons FOIA Reading Room FOIA Requests Received and Estimated Completion Dates FOIA Requests Received by the Carlsbad Field Office since 2009 5 U.S.C. § 552 10 CFR 1004 Fiscal Year FOIA Annual Reports for DOE Carlsbad Field Office FOIA 2009 Fiscal Year Annual Report FOIA 2008 Fiscal Year Annual Report FOIA 2007 Fiscal Year Annual Report FOIA 2006 Fiscal Year Annual Report FOIA 2005 Fiscal Year Annual Report FOIA 2004 Fiscal Year Annual Report FOIA 2003 Fiscal Year Annual Report FOIA 2002 Fiscal Year Annual Report

147

Retirement Plaque Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Retirement Plaque Request Form Retirement Plaque Request Form Fill out a separate form for each plaque requested. Allow two weeks for delivery. If you have any questions, please call Rudy Bartolo, Retirement Plaque Coordinator at ext. 5558. FORM MUST BE SUBMITTED (mailed or faxed) in order for work to commence. Return form to Retirement Plaque Coordinator, Mailstop 77R0125, or fax 4993. Please Print Clearly Requester's Name:_______________________________ Extension:_______________ Mail Stop: ________________ Today's date:__________________ With Frame _____ Without Frame_____ Date Needed: ________________________ Full name as it is to appear on plaque:_________________________________________ Number of years employed at Lab:______________ Beginning and ending dates of employment: ____________________________________

148

FY 2007 Congressional Request  

Office of Environmental Management (EM)

FY 2006 Appropriation FY 2007 Request Laboratory Table 70 Naval Petroleum and Oil Shale Reserves Naval Petroleum and Oil Shale Reserves Naval Petroleum and Oil Shale...

149

FY 2012 FOIA Requests  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Comments: Records sent. Ex 4. CLOSED FOIA Request BPA Letter BPA Documents 2012-00676 BPA Substation Design related to direct stroke lightning shieldking of substations...

150

FY 2011 FOIA Requests  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

11292010 Date Due: 12282010 Date Completed: 142011 FOIA Request BPA Letter BPA Documents 2011-00304 Bald Mountain substation, EFSEC Drach, Thomas Date Received: 11...

151

FY 2010 FOIA Requests  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-FOIA-Requests Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance &...

152

Updating Interconnection Screens for PV System Integration  

SciTech Connect (OSTI)

This white paper evaluates the origins and usefulness of the capacity penetration screen, offer short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen. Short-term and longer-term alternatives approaches are offered as examples; however, specific modifications to screening procedures should be discussed with stakeholders and must ultimately be adopted by state and federal regulatory bodies.

Coddington, M.; Mather, B.; Kroposki, B.; Lynn, K.; Razon, A.; Ellis, A.; Hill, R.; Key, T.; Nicole, K.; Smith, J.

2012-02-01T23:59:59.000Z

153

Repairable chip bonding/interconnect process  

DOE Patents [OSTI]

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

1997-01-01T23:59:59.000Z

154

Topic B Awardee: Eastern Interconnection States' Planning Council |  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection States' Eastern Interconnection States' Planning Council Topic B Awardee: Eastern Interconnection States' Planning Council The Eastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the American Recovery and Reinvestment Act (ARRA). The goal is to create an unprecedented collaborative among the states in the Eastern Interconnection. Comprised of public utility commissions, Governors' offices, energy offices, and other key government representatives, this collaboration will foster and produce consistent and coordinated direction to the regional and interconnection-level analyses and planning. Significant state input and direction increases the probability that the outputs will be useful to the

155

Recovery Act Interconnection Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

156

Flip chip electrical interconnection by selective electroplating and bonding  

E-Print Network [OSTI]

on a glass substrate made of 500/2000 A° of Cr/Au with 3150 lm in length and 10 lm in width. Two silicon. The interconnection chip has 102 Cr/Au interconnection lines with 3150 lm in length and 10 lm in width. The bonding pads on the ends of the interconnection lines are 40 lm by 40 lm. A 0.8 lm thick layer of aluminum

Lin, Liwei

157

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

158

Community Wind Handbook/Research Interconnecting behind Your...  

Open Energy Info (EERE)

your local utility. Most utilities and other electricity providers require you to enter into a formal agreement with them before you are allowed to interconnect your wind...

159

CHP: Connecting the Gap between Markets and Utility Interconnection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Markets and Utility Interconnection and Tariff Practices, 2006 The adoption of combined heat and power (CHP) systems by American industries has made substantial strides in the...

160

Physics of Failure of Electrical Interconnects | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies Program Annual Merit Review and Peer Evaluation ape036devoto2011p.pdf More Documents & Publications Physics of Failure of Electrical Interconnects Reliability...

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Proposed rule for Interconnection for Wind Energy and Other Alternativ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REGULATORY COMMISSION 18 CFR Part 35 (Docket No. RM05-4-000) Interconnection for Wind Energy and Other Alternative Technologies (January 24, 2005) AGENCY: Federal Energy...

162

RAPID/Geothermal/Transmission Siting & Interconnection/Montana...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionMontana) Jump to: navigation, search RAPID Regulatory and Permitting...

163

RAPID/Geothermal/Transmission Siting & Interconnection/Hawaii...  

Open Energy Info (EERE)

Utilities Commission to interconnect a proposed renewable energy project to the existing grid. Transmission Siting Threshold: No threshold provided Public Utility Definition for...

164

RAPID/Geothermal/Transmission Siting & Interconnection/Utah ...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionUtah) Jump to: navigation, search RAPID Regulatory and Permitting...

165

RAPID/Geothermal/Transmission Siting & Interconnection/Oregon...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionOregon) Jump to: navigation, search RAPID Regulatory and Permitting...

166

U.S. Army Fort Carson Interconnection Agreement  

Broader source: Energy.gov [DOE]

Document describes a sample interconnection agreement for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA).

167

Modelling of interconnects including coaxial cables and multiconductor lines.  

E-Print Network [OSTI]

??In recent years, electromagnetic compatibility (EMC) problems associated with high frequency and high speed interconnects are becoming of increasing concern. Coaxial cables are a popular (more)

Teo, Yu Xian

2013-01-01T23:59:59.000Z

168

National Offshore Wind Energy Grid Interconnection Study  

SciTech Connect (OSTI)

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States. A total of 54GW of offshore wind was assumed to be the target for the analyses conducted. A variety of issues are considered including: the anticipated staging of offshore wind; the offshore wind resource availability; offshore wind energy power production profiles; offshore wind variability; present and potential technologies for collection and delivery of offshore wind energy to the onshore grid; potential impacts to existing utility systems most likely to receive large amounts of offshore wind; and regulatory influences on offshore wind development. The technologies considered the reliability of various high-voltage ac (HVAC) and high-voltage dc (HVDC) technology options and configurations. The utility system impacts of GW-scale integration of offshore wind are considered from an operational steady-state perspective and from a regional and national production cost perspective.

Daniel, John P. [ABB Inc; Liu, Shu [ABB Inc; Ibanez, Eduardo [National Renewable Energy Laboratory; Pennock, Ken [AWS Truepower; Reed, Greg [University of Pittsburgh; Hanes, Spencer [Duke Energy

2014-07-30T23:59:59.000Z

169

Travel Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lodging Lodging Transportation SNAP COLLABORATION MEETING JUNE 1 - 3, 2006 TRAVEL FUNDING REQUEST FORM If you require Travel funding support from LBNL to attend the SNAP Collaboration Meeting, please fill out the travel request form below and click on the "SEND" button. As an alternative, you can simply email the requested information on the form to snap@lbl.gov Deadline: Please submit your request NLT Wednesday, May 10, 2006. Disclaimer: Please note that the submission of this request does not automatically constitute funding approval. 1. First Name Last Name 2. Has this travel funding support been pre-approved by the SNAP management? Yes No 3. If answer to #2 is "Yes": a) Approval by whom? b) What was the maximum reimbursement amount from SNAP?

170

Frequently Requested Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Frequently Requested Documents Frequently Requested Documents Frequently Requested Documents This is an index of frequently requested documents provided by the Department of Energy Idaho Operations Office. You must use the Adobe Acrobat file reader to read the files. If you do not have the reader you can download it free from http://get.adobe.com/reader/. FOIA Requests Received by DOE-ID in 2013 (pdf) April - ID-2013-00854 AMWTP - Charcoal filter breakdown in PAPRs - 600 KB Adobe Acrobat Icon Employee Concern - 135 KB Adobe Acrobat Icon All Hands Feedback - 63 KB Adobe Acrobat Icon AMWTP Employee Concern Ltr 1 - 70 KB Adobe Acrobat Icon RE: Please contact - ITG, about the EC interview (by B&W) - 43 KB Adobe Acrobat Icon RE: Please contact - ITG, about the EC interview (by B&W) - 69 KB Adobe Acrobat Icon

171

Disk Quota Increase Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disk Disk Quota Increase Disk Quota Increase Request NERSC will consider reasonable requests for changes in disk space and inode limits. Please submit a request through the "Request Forms" section at the NERSC help portal. If you select "Hopper scratch directory" from the "File System" menu below, the quota value requested applies to the combined contents of $SCRATCH and $SCRATCH2. Please ask for the least amount of resources you need, since the sum of disk space and inodes allocated to users already exceeds system capacity. In other words, system resources would be exhausted before all users could use their existing quotas. You can find out the current quotas and usage of disk space and inodes for your home and scratch file systems with the myquota command. You can find

172

DOE FOIA Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Administration FOIA Request Form Administration FOIA Request Form To make an Electronic FOIA (E-FOIA) request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. * Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form. Name: (Required) Organization: Address: (Required) Phone: FAX: Email: Reasonably Describe Records Describe the specific record (s) you seek with sufficient detail that a knowledgeable official of the activity may locate the record with a reasonable amount of effort. Such detail should include: dates, titles, file designations, and offices to be searched. Since most DOE records are not retained permanently, the more information that you provide, the better the opportunity there is to determine if the

173

The Design and Tests in a Three Interconnected Fluidized Bed  

Science Journals Connector (OSTI)

Hydrogen production based on chemical looping combustion can obtain clean hydrogen with near zero emission of carbon dioxide. This technique can be auto-thermal, making it very promising for hydrogen production. In this paper, the interconnected fluidized ... Keywords: chemical looping combustion, hydrogen production Interconnected fluidized beds

Junjiao Zhang; Jingzhou Jiang; Qiang Lu; Changqing Dong; Teng Zhang; Xinglei Liu; Zhiyong Liang; Yongping Yang

2010-12-01T23:59:59.000Z

174

A Scalable Interconnection Network Architecture for Petaflops Computing  

Science Journals Connector (OSTI)

Extrapolating technology advances in the near future, a computer architecture capable of petaflops performance will likely be based on a collection of processing nodes interconnected by a high-performance network. One possible organization would consist ... Keywords: computer architecture, interconnection networks, performance analysis, petaflops computing

Constantine Katsinis; Bahram Nabet

2004-02-01T23:59:59.000Z

175

Trinity Public Utilities District Direct Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

LEAD FEDERAL AGENCY: U.S. Department of Energy LEAD FEDERAL AGENCY: U.S. Department of Energy COOPERATING AGENCIES: U.S. Forest Service, U.S. Bureau of Land Management, U.S. Bureau of Reclamation TITLE: Final Environmental Impact Statement for the Trinity Public Utilities District Direct Interconnection Project, DOE/EIS-0389 LOCATION: Trinity County, California CONTACT: For additional information on this For general information on the final environmental impact U.S. Department of Energy National statement, contact: Environmental Policy Act process, write or call: Mr. Mark J. Wieringa Ms. Carol M. Borgstrom, Director Western Area Power Administration Office of NEPA Policy and Compliance P.O. Box 281213 Health, Safety and Security (GC-20) Lakewood, CO 80228 U.S. Department of Energy

176

10 Year Transmission Plan for the Western Electricity Interconnection  

Broader source: Energy.gov (indexed) [DOE]

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

177

Low Carbon Jobs in an Interconnected World | Open Energy Information  

Open Energy Info (EERE)

Jobs in an Interconnected World Jobs in an Interconnected World Jump to: navigation, search Name Low Carbon Jobs in an Interconnected World Agency/Company /Organization Global Climate Network Partner Institute for Public Policy Research Sector Energy Focus Area Energy Efficiency, Renewable Energy Topics Co-benefits assessment, Background analysis Website http://www.ippr.org.uk/publica Country Australia, Brazil, China, Germany, India, Nigeria, South Africa, United Kingdom, United States Australia and New Zealand, South America, Eastern Asia, Western Europe, Southern Asia, Western Africa, Southern Africa, Northern Europe, Northern America References Low Carbon Jobs in an Interconnected World[1] Low Carbon Jobs in an Interconnected World Author: Global Climate Network Price: Free Publication Date: 30 March 2010

178

Electricity Advisory Committee Potential Study Topics Requested by  

Broader source: Energy.gov (indexed) [DOE]

Potential Study Topics Requested by Potential Study Topics Requested by U.S. Department of Energy As of 2-10-11 Note: DOE invites the EAC to discuss, for each of the topics listed below, whether it should undertake a detailed analysis of the subject, or whether it should limit itself to providing recommendations to DOE about how the topic should be framed and analyzed by the national laboratories or other parties. 1. Long-Term Funding for Electric Infrastructure Analytic and Planning Capabilities. Using funds provided by the 2009 Recovery Act, the U.S. Department of Energy (DOE) has funded the establishment of interconnection-level capabilities to address long-term analytic and planning challenges. DOE also believes that given the likelihood of ongoing fundamental change in the electricity sector, the strategic

179

A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth to Enable Latency Reduction  

E-Print Network [OSTI]

D R A FT 1 A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth optoelectronic interconnection network router capable of supplying and efficiently utilizing higher bandwidth routing, interconnection network, latency hiding/reduction techniques, optoelectronic router. 1

Pinkston, Timothy M.

180

FOIA Request - June 2008  

Broader source: Energy.gov (indexed) [DOE]

02, 2008 2:33 PM 02, 2008 2:33 PM FOIA-Central DOE Headquarters FOIA Request Name:~el L. Krista~ Organization: Chaper 228, NTEU Address: NATIONAL TREASURY EMPLOYEES UNION Chapter 228 P.O. Box 2283 Germantown, MD 20874 Phone: 3019037143 FAX: 3019031758 Email: joel.kristal@em.doe.gov Record Description: RE: The~partmeiliof Energy's failure to comply with the Federal Code of Regulations 5 U.S.C. 7114(b) (4) The 7114 information request provides information relevant and necessary to rep ent Bargaining Unit Employees. This request is made under the Freedom of Information Act by Chapter 228 of the National Treasury Employees Union. We request the following information from January 1, 1998 to the June 1, 2008 for DOE Headquarters Union Chapters (i.e., Germantown and Forrestal) and every DOE site which has

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

FOIA Request - January 2008  

Broader source: Energy.gov (indexed) [DOE]

Tuesday, January 01, 2008 7:11 PM Tuesday, January 01, 2008 7:11 PM FOrA-Central DOE Headquarters FOIA Request Name: §~ Clements ] Organization: Friends of the Earth Address: 2736 Blossom Street Columbia, SC 29205 Phone: FAX: Email: 1 Record Description: January 1, 2008 Freedom of Information Officer U.S. Department of Energy Washington, DC 20585 RE: FOIA Request on DOE's Waste Solidification Building at SRS To Whom it May Concern - This is a request being made on behalf of the non-profit public-interest organization Friends of the Earth (FOE) under the Freedom of Information Act (FOIA), as amended. This request is being made under new revisions to the Freedom of.Information Act, recently passed by Congress and signed into law by President Bush in December 2007. If new regulations have not yet been finalized by the Department of Energy (DOE) to comply

182

E-Print Network 3.0 - attach interconnection technology Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Barbara; NONE Collection: Biology and Medicine ; Engineering 7 Call for Papers Optoelectronic Interconnects XII (OE113) Summary: interconnect technologies ultra-short reach...

183

Request For Records Disposition | Department of Energy  

Office of Environmental Management (EM)

Request For Records Disposition Request For Records Disposition Spent Nuclear Fuels Request For Records Disposition More Documents & Publications The Report To The President And...

184

Utility Wind Integration Group Distributed Wind/Solar Interconnection  

Broader source: Energy.gov (indexed) [DOE]

Utility Wind Integration Group Distributed Wind/Solar Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop May 21, 2013 8:00AM MDT to May 22, 2013 5:00PM MDT Golden, Colorado This two-day workshop will answer your questions about interconnecting wind and solar plants and other distributed generation applications to electric distribution systems while providing insight on integrating large-scale renewable generation into the transmission system. Held at the National Renewable Energy Laboratory's (NREL) state-of-the-art Energy Systems Integration Facility (ESIF) on the first day and at the Western Area Power Administration's Electric Power Training Center (EPTC) on the second day, the workshop will provide an overview of wind and solar interconnection

185

USLCI Interconnect Region Electricity datasets, 2008 | OpenEI  

Open Energy Info (EERE)

76 76 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278976 Varnish cache server USLCI Interconnect Region Electricity datasets, 2008 Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included.Datasets include generation and transmission of electricity for each of the interconnect regions. It is representative of the year 2008 mix of fuels used for utility generations for each of the interconnect regions and is based on the EIA electricity reports for all power plants in the US. Detailed information on the methodology is included in the module report and detailed spreadsheet.

186

PARS II New Contractor Information for Interconnection Security Agreement  

Broader source: Energy.gov (indexed) [DOE]

New Contractor Information for Interconnection Security Agreement New Contractor Information for Interconnection Security Agreement V1.0 (November 18, 2010) The Department of Energy (DOE) Headquarters Program Cyber Security Plan (PCSP), dated February 2008, requires the Project Assessment and Reporting System (PARS) II System Owner and the contractor sign an Interconnection Security Agreement (ISA). The requirement for an Interconnection Security Agreement can be found on page 182 of the PCSP. The ISA template is available for review on the PARS II portal (http://management.energy.gov/online_resources/pars2.htm) under Contractor Documents. Before the contractor begins sending data to PARS II, DOE will send the ISA to the contractor for review and signature. In order to prepare the ISA for review and signature, the PARS II Support Team needs

187

Interconnecting PV on NYC's Secondary Network Distribution System  

Broader source: Energy.gov [DOE]

To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report.

188

Photovoltaic Systems Interconnected onto Secondary Network Distribution Systems Success Stories  

Broader source: Energy.gov [DOE]

This report examines six case studies of photovoltaic (PV) systems integrated into secondary network systems. The six PV systems were chosen for evaluation because they are interconnected to secondary network systems located in four major Solar America Cities.

189

An optical data receiver for integrated photonic interconnects  

E-Print Network [OSTI]

The throughput bounds of traditional interconnect networks in microprocessors are being pushed to their limits. In past single-core processors, the number of long global wires constituted only a small fraction of the total. ...

Georgas, Michael S. (Michael Stephen)

2009-01-01T23:59:59.000Z

190

Evaluation of phase change materials for reconfigurable interconnects  

E-Print Network [OSTI]

The possible use of programmable integrated circuit interconnect vias using an indirectly heated phase change material is evaluated. Process development and materials investigations are examined. Devices capable of multiple ...

Khoo, Chee Ying

2010-01-01T23:59:59.000Z

191

Chemical looping combustion of coal in interconnected fluidized beds  

Science Journals Connector (OSTI)

Chemical looping combustion is the indirect combustion by use of oxygen carrier. It can...2...capture in power generating processes. In this paper, chemical looping combustion of coal in interconnected fluidized ...

LaiHong Shen; Min Zheng; Jun Xiao; Hui Zhang

2007-04-01T23:59:59.000Z

192

Perspectives on the metallic interconnects for solid oxide fuel cells  

Science Journals Connector (OSTI)

The various stages and progress in the development of interconnect materials for solid oxide fuel cells (SOFCs) over the last two decades are reviewed. The criteria for the application of materials as intercon...

Wei-zhong Zhu; Mi Yan

2004-12-01T23:59:59.000Z

193

5 F 13 Optica1 Interconnection T ransmitter Power BER  

E-Print Network [OSTI]

¼ 5¸ ¤ ü ? ø Ð Ð ú ¸ ? í ® F? 13 Optica1 Interconnection? T ransmitter Power Í BER? ? û - ¡ ü ?

Choi, Woo-Young

194

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities  

Broader source: Energy.gov [DOE]

The Energy Department today released the first National Offshore Wind Energy Grid Interconnection Study that investigated the key economic and technological factors that will influence the integration of offshore wind energy onto the national grid.

195

Interconnect modeling and optimization in deep sub-micron technologies  

E-Print Network [OSTI]

Interconnect will be a major bottleneck for deep sub-micron technologies in the years to come. This dissertation addresses the communication aspect from a power consumption and transmission speed perspective. A model for ...

Sotiriadis, Paul Peter P. (Paul Peter Peter-Paul), 1973-

2002-01-01T23:59:59.000Z

196

Accelerating Communication in On-Chip Interconnection Networks  

E-Print Network [OSTI]

. In this dissertation, several schemes are proposed to accelerate communication in on-chip interconnection networks within area and cost budgets to overcome the problems. First, an early transition scheme for fully adaptive routing algorithms is proposed to improve...

Ahn, Minseon

2012-07-16T23:59:59.000Z

197

Design and analysis of high performance multistage interconnection networks  

E-Print Network [OSTI]

an analytical model to compare its performance with the existing designs reported in the literature. We validate on model with extensive simulation studies. Index Terms - Multistage interconnection networks, packet switching, static buffer allocation, dynamic...

Bhogavilli, Suresh K

2012-06-07T23:59:59.000Z

198

Topic B Awardee: Eastern Interconnection States' Planning Council  

Broader source: Energy.gov [DOE]

TheEastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the...

199

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration (Desert Southwest Region) is preparing an EA that will assess the potential environmental impacts of a proposal to interconnect the planned Ridgenose Solar Energy Project to Westerns transmission system. Westerns actions could include constructing less than a mile of new transmission line from the solar facility to an existing substation, constructing an interconnection substation, and adding, moving, or modifying structures.

200

Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid  

SciTech Connect (OSTI)

The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.

Kou, Gefei [ORNL; Hadley, Stanton W [ORNL; Markham, Penn N [ORNL; Liu, Yilu [ORNL

2013-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

BPA-2012-00940-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- Phase 2 COntract 28333 Release 19 Bidding Document Source Document Requested: Contracting officers request for offer including Geotechnical Reportreference supplemental...

202

FOIA Request - August 2008  

Broader source: Energy.gov (indexed) [DOE]

Name:~semary L~ Name:~semary L~ Organization: Input Address: FOIA-Central@hq.doe.gov Tuesday, August 05,200810:18 AM FOIA-Central DOE Headquarters FOJA Request 11720 Plaza America 12th FL Reston, VA 20190 Phone: 703-707-3500 FAX: 703-707-6201 Email: rlaw@input.com Record Description: 11720 Plaza America Drive, 12th Floor Reston, VA 20190 Tel: (703) 707-3500 Fax: (703) 707-6201 www.input.com Freedom of Information Act (FOIA) ID# 9401 Dear FOIA Officer, AUG 0 5 2008 OZ- Under the Freedom of Information Act, 5 U.S.C. § 552, as amended, I am requesting clearly releasable portions of the documents regarding all contracts awarded under~tract # DEAC0494AL85001 the STRATEGICALLY HARDENED FACILITY DEFEAT (SHFD) requirement, awarded to Sandia Nationai Laboratory. Specifically, I am requesting copies of the following

203

Compute Reservation Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Queue Look Queue Wait Times Hopper Queues and Policies Edison Queues and Policies Carver Queues and Policies Dirac Queues and Policies Compute Reservation Request Form Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » Queues and Scheduling » Compute Reservation Request Form Compute Reservation Request Form

204

FOIA Request - September 2008  

Broader source: Energy.gov (indexed) [DOE]

September 01, 2008 9:29 PM September 01, 2008 9:29 PM FOIA-Central DOE Headquarters FOIA Request Name~illiam Trimbli) Organization: individual Address: Phone: FAX: Email : Record Description: S£ P0 2 20 0 86{ I request a copy of each of the/Contracts between uc~go Argonne, LLC and Pontarelli Group Charter, Inc., of Chicago,~L, that were signed or renewed in fiscal year 20~ Preferred Form or Format: Type of Requester (if provided) : An individual seeking information for personal use and not for commercial use. Fees and Fee Waivers: I agree to pay up to a specified amount for fees. Enter amount $ 75 Waiver or Reduction of Fees Factors (if provided): Expedited Processing: Specific Justification for Expedited Processing: 1 Morris. Alexander From: FOIA-Central@hq.doe.gov

205

FOIA Request - February 2008  

Broader source: Energy.gov (indexed) [DOE]

Morris. Alexander Morris. Alexander From: Sent: To: Subject: FOIA-Central@hq.doe.gov Friday, February 01, 2008 11 :50 AM FOIA-Central DOE Headquarters FOIA Request Name:lf~te Win~/senior Writer and Investigative Reporter Organization: Cybercast News Service Address: 325 S. Patrick Street Alexandria, VA 22314 Tel: 703-302-8352 E-Mail: pwinn@mediaresearch.org Phone: 7033028352 FAX: Email: pwinn@mediaresearch.org Record Description: RE: Freedom of Information Act Request Dear Sir or Madam I am a senior writer and investigative reporter for Cybercast News Service researching a news story for CNSNews.com. Pursuant to the Freedom of Information Act (5 U.S.C. Section 552), I request that the U.S. Department of Energy produce~ll correspondence, memoranda, documents, reports~ records,

206

EERE FY 2016 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE)

EERE FY 2016 Budget Request, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

207

DOE/EIS-0183 Record of Decision for the Electrical Interconnection of the Kittitas Valley Wind Project (09/04/09)  

Broader source: Energy.gov (indexed) [DOE]

Kittitas Valley Wind Project Kittitas Valley Wind Project September 2009 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 108 megawatts (MW) of power to be generated by the proposed Kittitas Valley Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Sagebrush Power Partners, LLC (Sagebrush) has received authorization from the Washington Energy Facility Site Evaluation Council (EFSEC) to construct and operate the proposed Wind Project in Kittitas County, Washington, and has requested interconnection to the FCRTS on BPA's Columbia-Covington 230-kV transmission line in the vicinity of Ellensburg, Washington. BPA will construct a new substation to accommodate this additional power into the

208

SWS Variance Request  

Broader source: Energy.gov [DOE]

As Grantees update and revise their field standards to align with the SWS, they may discover certain specifications that cannot be implemented precisely as described in the relevant SWS. In such cases, Grantees may request a variance from the relevant SWS.

209

User_ApproveTrainingRequest  

Broader source: Energy.gov (indexed) [DOE]

Approving User Training Requests Approving User Training Requests © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Approving User Training Requests Purpose The purpose of this job aid is to guide users through the step-by-step process of approving a user training request. Task A. Approve a User Training Request From the Home Page, click the You have pending approval requests link in the Alerts box. The Pending Reviews and Approvals page displays and defaults open to the pending approval. Click the expand icon ( ) next to the user's name and/or click the Title link for additional information on the request. Select the Enter Reasons for Approvals or Denials checkbox to allow for comments. Select the Approve radio

210

Freedom of Information Act (FOIA) and Privacy Act Requests |...  

Broader source: Energy.gov (indexed) [DOE]

Freedom of Information Act (FOIA) and Privacy Act Requests Freedom of Information Act (FOIA) and Privacy Act Requests FOIA and Privacy Act Requests FOIA Requests FOIA information...

211

NEUP Student Travel Request Form | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Student Travel Request Form NEUP Student Travel Request Form NEUP Fellowship Travel Request Form Student Travel Request Form.pdf More Documents & Publications Investing in the next...

212

REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Request for Records Disposition Authority REQUEST FOR RECORDS DISPOSITION AUTHORITY More Documents & Publications Request For Records Disposition Authority Request For Records...

213

National Electric Transmission Study 2006 Western Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Western Interconnection Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006 2 Western Interconnection 2006 Congestion Study - DOE Task 3 - 1. 2008 Modeling Study 2. 2015 Modeling Study - 2015 Planned Resource Development (IRPs and RPS) 3. W.I. Historical Path Usage Studies - 1999 thru 2005 - Physical congestion - Commercial congestion 3 WCATF Modeling Studies ABB Gridview Model * Model uses WECC 2005 L&R load forecast, modified with NPCC data for the NW, RMATS load forecasts for the Rocky Mtn area and the latest CEC load forecast for California * Hourly load shapes were developed using FERC 714 * Incremental transmission was added to a WECC 2008 case to represent 2015 network topology * WECC path ratings were used, modified as necessary to more closely

214

EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

34: Hualapai Valley Solar Interconnection Project, Arizona 34: Hualapai Valley Solar Interconnection Project, Arizona EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona Overview Hualapai Valley Solar, LLC, proposes to construct, operate and maintain a 340-megawatt, solar-powered generating facility in Mohave County, near Kingman, Ariz. The proposed project would use concentrating solar-power-trough technology to capture the sun's heat to make steam, which would power a traditional steam turbine generator. Proposed infrastructure would consist of a solar field, power block, thermal energy storage system, substation site, transmission line, temporary laydown areas and other ancillary facilities. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

215

Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrodeposited Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects H. McCrabb * , T. Hall * , J. Wu # , H. Zhang # , X. Liu # , E.J. Taylor * * Faraday Technology Inc., 315 Huls Dr., Clayton, OH 45315, USA # West Virginia University, Dept. of Mechanical and Aerospace Eng.ESB, Morgantown, WV, 26506, USA Overall Objective Overall Objective Principal Investigator: Heather McCrabb, Company Name: Faraday Technology, Inc., Address: 315 Huls Drive, Clayton, OH 45315, Phone: 937-836-7749, E-mail: heathermccrabb@faradaytechnology.com, Company website: faradaytechnology.com Previous Work at WVU Results Develop an inexpensive manufacturing process for depositing (Mn,Co) 3 O 4 spinel coatings onto SOFC interconnects. Introduction The decrease in the SOFC operating temperatures from 1000°C to between 650 and 850°C has enabled the use of chromia-forming ferritic stainless steels as interconnects

216

Renewable Energy Interconnection and Storage - Technical Aspects | Open  

Open Energy Info (EERE)

Renewable Energy Interconnection and Storage - Technical Aspects Renewable Energy Interconnection and Storage - Technical Aspects Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Renewable_Energy_Interconnection_and_Storage_-_Technical_Aspects&oldid=514543"

217

Graphene interconnects fully encapsulated in layered insulator hexagonal boron nitride  

Science Journals Connector (OSTI)

We demonstrate improvements in the electrical performance of graphene interconnects with full encapsulation by lattice-matching layered insulator, hexagonal boron nitride (h-BN). A novel layer-based transfer method is developed to assemble the top passivating layer of h-BN on the graphene surface to construct the h-BN/graphene/h-BN heterostructures. The encapsulated graphene interconnects (EGIs) are characterized and compared with graphene interconnects on either SiO2 or h-BN substrates with no top passivating h-BN layer. We observe significant improvements in both the maximum current density and breakdown voltage in EGIs. Compared with the uncovered structures, EGIs also show an appreciable increase (~67%) in power density at breakdown. These improvements are achieved without degrading the carrier transport characteristics in graphene wires. In addition, EGIs exhibit a minimal environment impact, showing electrical behavior insensitive to ambient conditions.

Nikhil Jain; Chris A Durcan; Robin Jacobs-Gedrim; Yang Xu; Bin Yu

2013-01-01T23:59:59.000Z

218

National Electric Transmission Congestion Study 2006 Eastern Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Memorandum To: Poonum Agrawal, David Meyer, U.S. Department of Energy CRA No. D08554-00 From: Prashant Murti, Alex Rudkevich, CRA International Date: Finalized March 13, 2006 Subject: GE MAPS INPUT ASSUMPTIONS: EASTERN INTERCONNECT This memorandum summarizes salient inputs to the CRA locational price forecasting model (GE MAPS). The model geographic footprint encompasses the US portion of the Eastern Interconnect and the Canadian province of Ontario. The analyses simulate the years 2008 and 2011. Primary data sources for the CRA GE MAPS model include the NERC MMWG, the General Electric generation and transmission databases for the Eastern Interconnect, various publications by NERC regions and Independent System Operators, FERC submissions by generation and transmission owners,

219

FOIA Request - May 2008  

Broader source: Energy.gov (indexed) [DOE]

Kate S. Keane Kate S. Keane PIICINB: (202) 434·1641 EMAIL: KSKcane@perkinscoic.com April 28, 2008 VIA U.S. MAIL Kevin Hagerty Director, FOINP A Division, ME-73 Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Re: Freedom of Information Act Request Dear Mr. Hagerty: perki~ Coie 607 Fourteenth Street N.W. Washington, D.C. 20005-2003 PHONE: 202.628.6600 FAX: 202.4341690 www.perkinscoie.com I am writing to request records, regardless of format, medium, or physical characteristics, and including electronic records and information, audiotapes, videotapes and photographs, pursuant to the Freedom ofInformation Act ("FOIA"), 5 U.S.C. §§ 552, et seg. Specifically, I am requestin~y record~(including correspondence)~lated to former Governor Mark

220

FOIA Request - November 2008  

Broader source: Energy.gov (indexed) [DOE]

FOIA-Central@hq.doe.gov FOIA-Central@hq.doe.gov Sent: To: Thursday, October 02,200810:40 AM FOIA-Central Subject: DOE Headquarters FOIA Request NameC:;ddie IVins~ Organization: AREVA NP Address: 3315 Old Forest Road, P.O. Box 10935 Lynchburg, VA 24506-0935 Phone: 434-832-3781 FAX: 434-382-3781 Email: eddie.ivins@areva.com Record Description: (Phase I of the applications for "Federal reference Number: DE-FOA-0000006.j Loan Guarantees for Nuclear Power Facitlies" Please provide the applications for NRG at the South Texas Project, Georgia Power for Vogtle and Dominion for North Anna. Preferred Form or Format: Electronic PDF Type of Requester (if provided): Affiliated with a private corporation and seeking information for the use in the company's business.

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FOIA Request - July 2008  

Broader source: Energy.gov (indexed) [DOE]

30, 2008 5:23 PM 30, 2008 5:23 PM FOIA-Central DOE Headquarters FOIA Request Name: MrS~ajitha uppal~ Organization: FedSources, Inc. Address: 8400 Westpark Dr, 4th floor, McLean, VA 22102 Phone: 703-610-8745 FAX: Email: uppallir@fedsources.com Record Description: - JUt 01 20080/ Please provide all clearly releasable copy of any~tract awarded from solicitation # DERPOI06EE110261including statement of work. This is related to TECHNICAL ENGINEERING ANALYTICAL AND~NAGEMENT SUPPORT SERVICES program. The CO Benjamin Lardizabal can be reached at (202) 287-1479 or benjamin.lardizabal@hq.doe.gov. Preferred Form or Format: Electronic Format Type of Requester (if provided): Affiliated with a private corporation and seeking information for the use in the company's

222

FOIA Request - April 2008  

Broader source: Energy.gov (indexed) [DOE]

NTEU NTEU The National Treasury Employees Union Abel Lopez FOIA Officer Department of the Energy 1000 Independence Avenue, SW Washington, DC 20585 RE: FOIA Request Dear· Sir or Madam:· March 21, 2008 Pursuant to the Freedom of Information Act, 5 U.S.C. §§ 552, et ~, the National Treasury Employees Union (NTEU) cf equests that the Department of the Energy provide it with a ist of all current positions (with series numbers) in the bargaining unit represented by NTEU whose position sensitivity is nonsensitive or low risk~ By this request, NTEU is seeking to identify all positions in the bargaining unit whose incumbents (or appointees or applicants for that position) have to complete the SF 85 as part of their background investigation. The list should simply

223

Response to Request  

Broader source: Energy.gov (indexed) [DOE]

Booz Allen Hamilton Response to Booz Allen Hamilton Response to Department of Energy Request for Information Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform the Federal Smart Grid Policy Department of Energy August 9, 2010 1 Booz Allen Hamilton Introduction Booz Allen Hamilton (Booz Allen) has had an enduring relationship with the Department of Energy (DOE) for more than two decades. We are pleased to be responding to the DOE's Request for Information (RFI), Implementing the National Broadband Plan by Studying the Communcations Requirements of Electric Utilities to Inform Federal Smart Grid Policy, with our perspectives on the use of broadband communications technology to meet emerging Smart Grid requirements. In its RFI,

224

FOIA Request - December 2008  

Broader source: Energy.gov (indexed) [DOE]

Saturday, November 29. 2008 1 :24 PM Saturday, November 29. 2008 1 :24 PM FOIA-Central DOE Headquarters FOIA Request Name~eila Thompso~ Organization: G4i Consulting, Inc. Address: 46169 Westlake Drive, Suite 120, Sterling, VA 20165 Phone; 703-433-5460 FAX: 877.286.9645 Email: sthompson@govg4i.com Record Description: DEC 01 2008 Nationwide Professional Skills Training Program ~esolicitation #DE-SOL-00001~Please accept this as a formal FOIA request for Informa~ on the prior incumbents' contracts/solicitation. Please send the incumbents' proposals and the government's Section B pricing table and tabulation across all bidders in the last procurement for these services. Thank you for your assistance. Nationwide Professional Skills Training Program -

225

Fire Protection Account Request Form  

Broader source: Energy.gov (indexed) [DOE]

Fire Protection System Account Request Form Fire Protection System Account Request Form To obtain a user id and password to access the Fire Protection system, please complete the form, save the file and email it to hssUserSupport@hq.doe.gov or print and fax it to 301-903-9823. We will provide a username and password to new account holders. Please allow several business days to process your account request. When your request is approved, you will be contacted with your

226

FY 2015 Budget Request Webinar  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

based on actual integrated biorefinery project plant performance data. eere.energy.gov 19 Bioenergy Technologies - FY 2015 Budget Request (Dollars in Thousands) FY 2013 Current FY...

227

The FY 2005 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE)

This presentation provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2005 budget request to Congress.

228

The FY 2006 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE)

This presentation provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2005 budget request to Congress.

229

High-temperature quenching of electrical resistance in graphene interconnects  

E-Print Network [OSTI]

into the chip interconnect design the materials with low electrical resistance and high thermal con- ductivity dependence of the resistance were explained by the thermal generation of the electron-hole pairs and carrier, increased total thermal boundary resistance of the chip layers, incorporation of the alternative dielectric

230

STABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS  

E-Print Network [OSTI]

, with energy imbalance in the physical system, with or without network congestion, driving the market responseSTABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS F.L. Alvarado1 J University of Paraiba, Brazil Abstract: The use of market mechanisms to determine gen- eration dispatch

231

Energy and Reliability in Future NOC Interconnected CMPS  

E-Print Network [OSTI]

In this dissertation, I explore energy and reliability in future NoC (Network-on-Chip) interconnected CMPs (chip multiprocessors) as they have become a first-order constraint in future CMP design. In the first part, we target the root cause...

Kim, Hyungjun

2013-08-01T23:59:59.000Z

232

Solar Energy to Benefit from New FERC Interconnection Procedures  

Office of Energy Efficiency and Renewable Energy (EERE)

As a major win for solar and testament to the impact of Department of Energys SunShot Initiative funded research at the national labs, this past month Federal Energy Regulatory Commission announced the adoption of new fast track rules to make the interconnection process dramatically cheaper and faster for small wholesale energy projects, representing a major improvement with nationwide impacts.

233

Hermetic aluminum radio frequency interconnection and method for making  

DOE Patents [OSTI]

The present invention provides a light-weight, hermetic coaxial radio-frequency (RF) interconnection having an electrically conductive outer housing made of aluminum or an aluminum alloy, a central electrical conductor made of ferrous or non-ferrous material, and a cylinder of dielectric material comprising a low-melting-temperature, high-thermal-expansion aluminophosphate glass composition for hermetically sealing between the aluminum-alloy outer housing and the ferrous or non-ferrous center conductor. The entire RF interconnection assembly is made permanently hermetic by thermally fusing the center conductor, glass, and housing concurrently by bringing the glass to the melt point by way of exposure to an atmospheric temperature sufficient to melt the glass, less than 540.degree. C., but that does not melt the center conductor or the outer aluminum or aluminum alloy housing. The composition of the glass used is controlled to provide a suitable low dielectric constant so that an appropriate electrical characteristic impedance, for example 50 ohms, can be achieved for an electrical interconnection that performs well at high radio frequencies and also provides an interconnection maintaining a relatively small physical size.

Kilgo, Riley D. (Albuquerque, NM); Kovacic, Larry (Albuquerque, NM); Brow, Richard K. (Rolla, MO)

2000-01-01T23:59:59.000Z

234

Optimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects  

E-Print Network [OSTI]

tapering is shown to reduce the (a CMOS inverter) with the driver (a CMOS inverter). The power dissipatedOptimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects Magdy A. El-Moursy and Eby G. Friedman Department of Electrical and Computer Engineering University of Rochester Rochester, New

Friedman, Eby G.

235

Lumped Electro-Thermal Model of On-chip Interconnects  

E-Print Network [OSTI]

, among other effects, an increase of electrical resistivity of metal inter- connect and thus of operating frequency has dramatically magnified the electrical power density leading to a signifi- cant tools in fact model interconnections by discretizing them in a set of elementary subsections and thus

Paris-Sud XI, Université de

236

BPA-2015-00018-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in the commercial interest of the requester." If my request for a waiver or reduction in fees is denied, I agree to pay up to (enter amount) to process my request....

237

Preliminary Response of PJM Interconnection, L.L.C. to the Operating...  

Broader source: Energy.gov (indexed) [DOE]

Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant...

238

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning- June 6, 2013  

Broader source: Energy.gov [DOE]

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

239

H C26 Performance Analysis of Optica1 Interconnection Systems Inch-ing  

E-Print Network [OSTI]

Analysis of Optica1 Interconnection Systems Inch- ing T ransmitter T emperature Dependence .è ¯ ? , ? ? ì

Choi, Woo-Young

240

2014 NERSC allocation requests due September 22  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC allocation requests due September 22 2014 NERSC allocation requests due September 22 August 13, 2013 by Francesca Verdier (0 Comments) NERSC's allocation submission system is...

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Hanford Speakers Bureau Request Form - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Hanford Speakers Bureau at 509.376.3419. REQUESTER CONTACT INFORMATION Contact Name * PhoneCell * Address * City * Zip Code * Email Address * SPEAKER REQUEST INFORMATION...

242

BPA-2012-00793-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at 12:43 pm on Tuesday February 21. My new request is for BPA's boilerplate hydroelectric power purchase agreement. Preferred format: PDF Type of Requester: Scholarly...

243

BPA-2013-00017-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

brian.morris@harris.com Sent: Monday, October 01, 2012 6:05 AM To: FOIA Subject: FOIA Request The following is a New FOIA request: *** Name: Brian...

244

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked processor  

E-Print Network [OSTI]

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked of free-space optical interconnect for the three-dimensional optoelectronic stacked processor (3DOESP) has VLSI; Optoelectronics; VCSELs 1. Introduction Current electronic interconnection technology cannot keep

Esener, Sadik C.

245

A novel framework for exploring 3-D FPGAs with heterogeneous interconnect fabric  

Science Journals Connector (OSTI)

A heterogeneous interconnect architecture can be a useful approach for the design of 3-D FPGAs. A methodology to investigate heterogeneous interconnection schemes for 3-D FPGAs under different 3-D fabrication technologies is proposed. Application of ... Keywords: 3-D integration, 3-D reconfigurable architectures, FPGAs, design framework, interconnection fabric

Kostas Siozios; Vasilis F. Pavlidis; Dimitrios Soudris

2012-03-01T23:59:59.000Z

246

Integration of a waveguide self-electrooptic effect device and a vertically coupled interconnect waveguide  

DOE Patents [OSTI]

A self-electrooptic effect device ("SEED") is integrated with waveguide interconnects through the use of vertical directional couplers. Light initially propagating in the interconnect waveguide is vertically coupled to the active waveguide layer of the SEED and, if the SEED is in the transparent state, the light is coupled back to the interconnect waveguide.

Vawter, G. Allen (Corrales, NM)

2008-02-26T23:59:59.000Z

247

The FY 2005 Budget Request  

Broader source: Energy.gov (indexed) [DOE]

5 Budget Request 5 Budget Request Building on a Record of Success February 2, 2004 David Garman Assistant Secretary Office of Energy Efficiency and Renewable Energy Building on a Record of Success Meeting Presidential Priorities Citizen Centered Affordable Energy Energy Security Climate Change Building on a Record of Success FY 2005 Budget Request * Supports Presidential commitment to strengthen energy security and enhance energy choices for all Americans while protecting the environment * Maintains FY 2004 request levels in budget constrained year * Builds upon and sustains a record of success * Research & Development (R&D) * Deployment * Management Building on a Record of Success Still EERE's Request Is ^ Priority Driven 1. Dramatically reduce or even end dependence on foreign oil

248

DOE Headquarters FOIA Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Oak Ridge Office FOIA Request Form Oak Ridge Office FOIA Request Form To make an Electronic FOIA (E-FOIA) request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. * Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form. Name: (Required) Organization: Address: (Required) Phone: FAX: Email: Reasonably Describe Records Describe the specific record (s) you seek with sufficient detail that a knowledgeable official of the activity may locate the record with a reasonable amount of effort. Such detail should include: dates, titles, file designations, and offices to be searched. Since most DOE records are not retained permanently, the more information that you provide, the better the opportunity there is to determine if the

249

The FY 2006 Budget Request  

Broader source: Energy.gov (indexed) [DOE]

6 Budget Request 6 Budget Request David Garman Assistant Secretary Office of Energy Efficiency and Renewable Energy February 7, 2005 FY 2006 Budget Request * Supports Presidential commitment to strengthen energy security and enhance energy choices for all Americans while protecting the environment * Builds upon and sustains a record of success ƒ Research & Development (R&D) ƒ Deployment ƒ Management * Continues trend of budget requests in the $1.2 billion range 2 Budget Request is Priority Driven 1. Dramatically reduce or even end dependence on foreign oil 2. Reduce the burden of energy prices on the disadvantaged 3. Increase the viability and deployment of renewable energy technologies 4. Increase the reliability and efficiency of electricity generation and use

250

ARM - Baseline Change Request Guidelines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DocumentsBaseline Change Request Guidelines DocumentsBaseline Change Request Guidelines Page Contents Introduction Submit a BCR BCR Process Flowchart Baseline Change Request Guidelines Introduction Baseline Change Requests (BCR) are used by the ARM Infrastructure as a process to provide configuration control and for formally requesting and documenting changes within the ARM Infrastructure. Configuration Control: BCRs are required for changes to instruments, data systems, data processes, datastreams, measurement methods, and facilities. They help ensure that all aspects of the ARM Infrastructure are consulted prior to implementing changes. Seemingly minor changes can have significant repercussions throughout the Facility and therefore, NO change to an operational instrument, computer, facility, or other system can or will be

251

PJM Interconnection, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

LLC Smart Grid Project LLC Smart Grid Project Jump to: navigation, search Project Lead PJM Interconnection, LLC Country United States Headquarters Location Norristown, Pennsylvania Additional Benefit Places Illinois, Indiana, Kentucky, Maryland, Michigan, North Carolina, New Jersey, Ohio, Pennsylvania, Virgin Islands, West Virginia Recovery Act Funding $13,698,091.00 Total Project Value $228203511 Coverage Area Coverage Map: PJM Interconnection, LLC Smart Grid Project Coordinates 40.121497°, -75.3399048° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

252

Geothermal Power and Interconnection: The Economics of Getting to Market  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power and Power and Interconnection: The Economics of Getting to Market David Hurlbut Technical Report NREL/TP-6A20-54192 April 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut Prepared under Task No. WE11.0815 Technical Report NREL/TP-6A20-54192 April 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

253

Impact of High Solar Penetration in the Western Interconnection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of High Solar Penetration Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Technical Report NREL/TP-5500-49667 December 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Prepared under Task No. SM101610

254

EIS-0435: Modification of the Groton Generation Station Interconnection  

Broader source: Energy.gov (indexed) [DOE]

5: Modification of the Groton Generation Station 5: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota EIS-0435: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Summary This EIS evaluates the environmental impacts of a proposal for DOE's Western Area Power Administration to modify its Large Generator Connection Agreement for the Groton Generation Station in Brown County, South Dakota. The modification would allow Basin Electric Power Cooperative, which operates the generation station, to produce power above the current operating limit of 50 average megawatts. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download June 3, 2011 EIS-0435: Final Environmental Impact Statement

255

Interconnecting PV on New York City's Secondary Network Distribution System  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to ???¢????????networks???¢??????? in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1???¢????????PV Deployment Analysis for New York City???¢????????we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2???¢????????A Briefing for Policy Makers on Connecting PV to a Network Grid???¢????????presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3???¢????????Technical Review of Concerns and Solutions to PV Interconnection in New Y

K. Anderson; M. Coddington; K. Burman; S. Hayter; B. Kroposki; and A. Watson

2009-11-30T23:59:59.000Z

256

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

257

GRR/Section 8-TX-b - ERCOT Interconnection | Open Energy Information  

Open Energy Info (EERE)

8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection Process.pdf Click to View Fullscreen Regulations & Policies PUCT Substantive Rule 25.198 Triggers None specified Click "Edit With Form" above to add content 8-TX-b - ERCOT Interconnection Process.pdf 8-TX-b - ERCOT Interconnection Process.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedures for interconnection with Electricity Reliability Council of Texas (ERCOT) in Texas. According to PUCT Substantive Rule 25.198, the responsibility for

258

Power System Study for Renewable Energy Interconnection in Malaysia  

Science Journals Connector (OSTI)

The renewable energy (RE) sector has grown exponentially in Malaysia with the introduction of the Feed-In-Tariff (FIT) by the Ministry of Energy, Green Technology and Water. Photovoltaic, biogas, biomass and mini hydro are among the renewable energy sources which offer a lucrative tariff to incite developers in taking the green technology route. In order to receive the FIT, a developer is required by the utility company to perform a power system analysis which will determine the technical feasibility of an RE interconnection to the utility company's existing grid system. There are a number of aspects which the analysis looks at, the most important being the load flow and fault levels in the network after the introduction of an RE source. The analysis is done by modelling the utility company's existing network and simulating the network with the interconnection of an RE source. The results are then compared to the values before an interconnection is made as well as ensuring the voltage rise or the increase in fault levels do not violate any pre-existing regulations set by the utility company. This paper will delve into the mechanics of performing a load flow analysis and examining the results obtained.

O F Askar; V K Ramachandaramurthy

2013-01-01T23:59:59.000Z

259

Corrosion of Metallic SOFC Interconnects in Coal Syngas  

SciTech Connect (OSTI)

With recent reductions in the operating temperature of Solid Oxide Fuel Cells (SOFC), the potential of using metallic interconnect has gone up. There is also an interest in using Coal syngas as the fuel gas and thus there is a need to analyze the behavior and performance of metallic interconnects when exposed to Coal syngas. Three high temperature material alloys, Crofer 22 APU, Ebrite and Haynes 230, having the potential to be used as SOFC interconnects were studied in simulated wet coal syngas. These alloys were exposed to syngas at 800 degrees C and for 100 hours. The exposure to coal syngas led to the formation of oxides and spinels, which evidently led to an increase in electrical resistance. Oxidation in a reducing and carburizing environment leads to unique phase and morphology formations. A comparative analysis was carried out for all the three alloys, wherein the samples were characterized by using SEM, EDS, Raman and X-Ray diffraction to obtain the morphology, thickness, composition and crystal structure of the oxides and spinels

Dastane, R.R. (University of West Virginia); Liu, X. (University of West Virginia); Johnson, C., Mao, Scott (University of Pittsburgh)

2007-09-01T23:59:59.000Z

260

Request Data.PDF  

Broader source: Energy.gov (indexed) [DOE]

Hudson-Reed Limited Hudson-Reed Limited ) ) ) ) ) Case Number: 2010-CW- 1403 REQUEST FOR DATA Date issued: March 2, 2010 On September 1, 2009, the Department of Energy (DOE or the Department) received a complaint regarding Hudson Reed "shower tower" model number AS333. The complaint alleges that testing of this model demonstrated that the showerhead exceeds the Federal maximum water flow rate requirement. DOE' s regulations for enforcement, contained in 10 CFR § 430.70, state that DOE may conduct enforcement testing of a covered product upon receiving information in writing that a particular covered product may not be in compliance with the applicable performance standard. The first step of this procedure is for the Department to examine the manufacturer's test data.

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Monolithically interconnected GaAs solar cells: A new interconnection technology for high voltage solar cell output  

SciTech Connect (OSTI)

Photovoltaic linear concentrator arrays can benefit from high performance solar cell technologies being developed at AstroPower. Specifically, these are the integration of thin GaAs solar cell and epitaxial lateral overgrowth technologies with the application of monolithically interconnected solar cell (MISC) techniques. This MISC array has several advantages which make it ideal for space concentrator systems. These are high system voltage, reliable low cost monolithically formed interconnections, design flexibility, costs that are independent of array voltage, and low power loss from shorts, opens, and impact damage. This concentrator solar cell will incorporate the benefits of light trapping by growing the device active layers over a low-cost, simple, PECVD deposited silicon/silicon dioxide Bragg reflector. The high voltage-low current output results in minimal 12R losses while properly designing the device allows for minimal shading and resistance losses. It is possible to obtain open circuit voltages as high as 67 volts/cm of solar cell length with existing technology. The projected power density for the high performance device is 5 kW/m for an AMO efficiency of 26% at 1 5X. Concentrator solar cell arrays are necessary to meet the power requirements of specific mission platforms and can supply high voltage power for electric propulsion systems. It is anticipated that the high efficiency, GaAs monolithically interconnected linear concentrator solar cell array will enjoy widespread application for space based solar power needs. Additional applications include remote man-portable or ultra-light unmanned air vehicle (UAV) power supplies where high power per area, high radiation hardness and a high bus voltage or low bus current are important. The monolithic approach has a number of inherent advantages, including reduced cost per interconnect and increased reliability of array connections. There is also a high potential for a large number of consumer products.

Dinetta, L.C.; Hannon, M.H.

1995-10-01T23:59:59.000Z

262

EERE FY 2015 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies eere.energy.gov 7 FY 2015 EERE Budget Request - 2.317B Vehicles, 359M Bioenergy, 253M Fuel Cells, 93M Advanced Manufacturing, 305M Buildings, 212M...

263

Response to several FOIA requests - Renewable Energy. | Department...  

Office of Environmental Management (EM)

Response to several FOIA requests - Renewable Energy. Response to several FOIA requests - Renewable Energy. Response to several FOIA requests - Renewable Energy....

264

REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

RS-Weapons X-Rays REQUEST FOR RECORDS DISPOSITION AUTHORITY More Documents & Publications REQUEST FOR RECORDS DISPOSITION AUTHORITY REQUEST FOR RECORDS DISPOSITION AUTHORITY...

265

Response to several FOIA requests - Renewable Energy. | Department...  

Broader source: Energy.gov (indexed) [DOE]

Response to several FOIA requests - Renewable Energy. Response to several FOIA requests - Renewable Energy, ENERGY RESOURCES and CONSERVATION Response to several FOIA requests -...

266

Response to several FOIA requests - Renewable Energy | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Response to several FOIA requests - Renewable Energy Response to several FOIA requests - Renewable Energy Response to several FOIA requests - Renewable Energy, nepdg20012250.pdf....

267

Request For Records Disposition Authority | Department of Energy  

Office of Environmental Management (EM)

Request For Records Disposition Authority Request For Records Disposition Authority National Archives Pacific Southwest Region Request For Records Disposition Authority More...

268

REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy  

Office of Environmental Management (EM)

Pacific Northwest Lab: Richland Operations Office REQUEST FOR RECORDS DISPOSITION AUTHORITY More Documents & Publications REQUEST FOR RECORDS DISPOSITION AUTHORITY Request For...

269

SSRL Computer & Networking Support Requests  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Help Request Help Request To use this form - Please enter your contact information below and select a category for your request. Also, provide a brief description of your request. When purchasing items, please include an account number. Priority*: Normal Urgent Requestor: (Name of person to contact for this request) Email: Phone: Support Required: I don't know Computer Support Network Support Printer Support Select Type of Request I don't know Details of your request: Property Control #: PC# Account number (as needed): * Normal priority requests will be attended to within the next two business days at the most. Urgent requests will receive attention as soon as possible. Submit Clear Fields SSRL Computing SSRL Home SLAC Home Stanford University Last Updated: 06 JUN 2007

270

Current Annualized Request  

Broader source: Energy.gov (indexed) [DOE]

Organization Organization FY 2012 FY 2013 FY 2014 Current Annualized Request CR $ % National Security Weapons Activities* 7,214,834 7,557,342 7,868,409 +311,067 +4.1% Defense Nuclear Nonproliferation 2,300,950 2,409,930 2,140,142 -160,808 -7.0% Naval Reactors 1,080,000 1,086,610 1,246,134 +166,134 +15.4% Office of the Administrator 410,000 412,509 397,784 -12,216 -3.0% Total, National Nuclear Security Administration 11,005,784 11,466,391 11,652,469 +304,177 +2.8% Energy and Environment Energy Efficiency and Renewable Energy 1,780,548 1,820,713 2,775,700 +995,152 +55.9% Electricity Delivery and Energy Reliability 136,178 139,954 169,015 +32,837 +24.1% Fossil Energy 554,806 714,033 637,975 +83,169 +15.0% Nuclear Energy 853,816 863,996 735,460 -118,356 -13.9% Race to the Top for Energy Efficiency and Grid Modernization

271

Production process for advanced space satellite system cables/interconnects.  

SciTech Connect (OSTI)

This production process was generated for the satellite system program cables/interconnects group, which in essences had no well defined production process. The driver for the development of a formalized process was based on the set backs, problem areas, challenges, and need improvements faced from within the program at Sandia National Laboratories. In addition, the formal production process was developed from the Master's program of Engineering Management for New Mexico Institute of Mining and Technology in Socorro New Mexico and submitted as a thesis to meet the institute's graduating requirements.

Mendoza, Luis A.

2007-12-01T23:59:59.000Z

272

Novel Composite Materials for SOFC Cathode-Interconnect Contact  

SciTech Connect (OSTI)

This report summarized the research efforts and major conclusions of our University Coal Research Project, which focused on developing a new class of electrically-conductive, Cr-blocking, damage-tolerant Ag-perovksite composite materials for the cathode-interconnect contact of intermediate-temperature solid oxide fuel cell (SOFC) stacks. The Ag evaporation rate increased linearly with air flow rate initially and became constant for the air flow rate {ge} {approx} 1.0 cm {center_dot} s{sup -1}. An activation energy of 280 KJ.mol{sup -1} was obtained for Ag evaporation in both air and Ar+5%H{sub 2}+3%H{sub 2}O. The exposure environment had no measurable influence on the Ag evaporation rate as well as its dependence on the gas flow rate, while different surface morphological features were developed after thermal exposure in the oxidizing and reducing environments. Pure Ag is too volatile at the SOFC operating temperature and its evaporation rate needs to be reduced to facilitate its application as the cathode-interconnect contact. Based on extensive evaporation testing, it was found that none of the alloying additions reduced the evaporation rate of Ag over the long-term exposure, except the noble metals Au, Pt, and Pd; however, these noble elements are too expensive to justify their practical use in contact materials. Furthermore, the addition of La{sub 0.8}Sr{sub 0.2}MnO{sub 3} (LSM) into Ag to form a composite material also did not significantly modify the Ag evaporation rate. The Ag-perovskite composites with the perovskite being either (La{sub 0.6}Sr{sub 0.4})(Co{sub 0.8}Fe{sub 0.2})O{sub 3} (LSCF) or LSM were systematically evaluated as the contact material between the ferritic interconnect alloy Crofer 22 APU and the LSM cathode. The area specific resistances (ASRs) of the test specimens were shown to be highly dependent on the volume percentage and the type of the perovskite present in the composite contact material as well as the amount of thermal cycling that the specimens were subjected to during testing. The Ag-LSCF composite contact materials proved more effective in trapping Cr within the contact material and preventing Cr migration into the cathode than the Ag-LSM composites. Ag-perovskite composite contact materials are promising candidates for use in intermediate-temperature SOFC stacks with ferritic stainless steel interconnects due to their ability to maintain acceptably low ASRs while reducing Cr migration into the cathode material.

J. H. Zhu

2009-07-31T23:59:59.000Z

273

Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)  

SciTech Connect (OSTI)

This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-10-01T23:59:59.000Z

274

EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town  

Broader source: Energy.gov (indexed) [DOE]

84: Invenergy Interconnection for the Wray Wind Energy 84: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO Summary DOE's Western Area Power Administration prepared this EA to evaluate the environmental impacts of interconnecting the proposed Wray Wind Energy Project, for approximately 90 megawatts of wind generation, to Western's existing Wray Substation in Yuma County, Colorado. Public Comment Opportunities None available at this time. Documents Available for Download December 27, 2012 EA-1884: Finding of No Significant Impact Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO December 27, 2012 EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray,

275

GRR/Section 8-TX-c - Distributed Generation Interconnection | Open Energy  

Open Energy Info (EERE)

GRR/Section 8-TX-c - Distributed Generation Interconnection GRR/Section 8-TX-c - Distributed Generation Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-c - Distributed Generation Interconnection 8-TX-c - Distributed Generation Interconnection.pdf Click to View Fullscreen Contact Agencies Public Utility Commission of Texas Regulations & Policies PUCT Substantive Rule 25.211 PUCT Substantive Rule 25.212 Triggers None specified Click "Edit With Form" above to add content 8-TX-c - Distributed Generation Interconnection.pdf 8-TX-c - Distributed Generation Interconnection.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the process for distributed generation (DG)

276

STUDENT RECREATION CENTER FACILITY REQUEST Group Name: ____________________________ Today's Date: __________  

E-Print Network [OSTI]

STUDENT RECREATION CENTER FACILITY REQUEST � Group Name: ____________________________ Today's Date:____________________ Time of Event: Start ______ Finish ______ � Facility Requested: o Lockridge Arena ____ Recreational Gym. _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ By requesting the Colorado School of Mines Student Recreation Center, I acknowledge that the requested activity

277

Generation Interconnection Policies and Wind Power: A Discussion of Issues, Problems, and Potential Solutions  

SciTech Connect (OSTI)

This report describes the adoption and implementation of FERC Order 2003 and the reasons for the sharp rise in generation interconnection filings in recent years.

Porter, K.; Fink, S.; Mudd, C.; DeCesaro, J.

2009-01-01T23:59:59.000Z

278

Comparing Germany's and California's Interconnection Processes for PV Systems (White Paper)  

SciTech Connect (OSTI)

Establishing interconnection to the grid is a recognized barrier to the deployment of distributed energy generation. This report compares interconnection processes for photovoltaic projects in California and Germany. This report summarizes the steps of the interconnection process for developers and utilities, the average length of time utilities take to process applications, and paperwork required of project developers. Based on a review of the available literature, this report finds that while the interconnection procedures and timelines are similar in California and Germany, differences in the legal and regulatory frameworks are substantial.

Tweedie, A.; Doris, E.

2011-07-01T23:59:59.000Z

279

Energy Requirement and Speed Analysis of Electrical and Free-Space Optical Digital Interconnections  

Science Journals Connector (OSTI)

Scaling of VLSI technology has been dramatically increasing microelectronic device densities and speeds. However, the interconnection technology between devices does not advance proportionally. Limited available ...

Gke I. Yayla; Philippe J. Marchand

1998-01-01T23:59:59.000Z

280

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2009-01-01T23:59:59.000Z

282

Optical Digital Audio Interconnect Based on Organic Light Emitting Diodes and Organic Photodiodes  

Science Journals Connector (OSTI)

An optical interconnect using solely organic optoelectronic components is presented. Careful optimization of the organic light emitting diodes and photodiodes allows us to successfully...

Valouch, Sebastian; Punke, Martin; Kettlitz, Siegfried W; Lemmer, Uli; Gerken, Martina

283

Request Log Closedl Date Yes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

284

Electrical isolation of component cells in monolithically interconnected modules  

DOE Patents [OSTI]

A monolithically interconnected photovoltaic module having cells which are electrically connected which comprises a substrate, a plurality of cells formed over the substrate, each cell including a primary absorber layer having a light receiving surface and a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, and a cell isolation diode layer having a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, the diode layer intervening the substrate and the absorber layer wherein the absorber and diode interfacial regions of a same conductivity type orientation, the diode layer having a reverse-breakdown voltage sufficient to prevent inter-cell shunting, and each cell electrically isolated from adjacent cells with a vertical trench trough the pn-junction of the diode layer, interconnects disposed in the trenches contacting the absorber regions of adjacent cells which are doped an opposite conductivity type, and electrical contacts.

Wanlass, Mark W. (Golden, CO)

2001-01-01T23:59:59.000Z

285

BPA?2012?00479?FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

December 28, 2011 4:26 PM To: FOIA Subject: FOIA Request The following is a New FOIA request: Name: Richard van Dijk Organization: Another Way BPA Address Phone: No FAX number...

286

FY 2016 Congressional Budget Request for OE  

Broader source: Energy.gov [DOE]

FY 2016 Budget in Brief and detailed Congressional Budget Request for OE. The FY 2016 request reflects the Administrations priority on modernizing the electric grid and boosting the resilience of infrastructure.

287

BPA-2011-00946-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration P. O. Box 3621-DK-7 Portland, OR 97208-3621 Re: FOIA Request - Contracting Officers Dear Ms. Brannon: This is a request under the Freedom of Information Act...

288

FY 2016 Budget Request Now Available  

Broader source: Energy.gov [DOE]

The Office of Electricity Delivery and Energy Reliabilitys FY 2016 Budget Request is now available. The FY 2016 request reflects the Administrations priority on modernizing the electric grid and boosting the resilience of infrastructure.

289

BPA-2012-00860-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

scottc.johnson@us.abb.com Sent: Tuesday, March 06, 2012 5:09 PM To: FOIA ;si & JVE) B Subject: FOIA Request OIA ()F1 ICE L'JiiS UVIE: The following is a New FOIA request: ** * **...

290

BPA-2012-00862-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

scott.c.johnson@us.abb.com Sent: Tuesday, March 06, 2012 4:54 PM To: FOIA Subject: FOIA Request The following is a New FOIA request: Name: Scott C. Johnson Organization: ABB Inc....

291

BPA-2012-00551-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sent: Tuesday, January 10, 2012 11:40 AM To: FOIA Subject: Re: BPA FOIA request Hello, I have not received this info requested and the time allowed has expired. Please...

292

BPA-2012-01631-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Request: 1) Source Code for Electromagnetic Transients Program (EMTP) 2) EMTP Rule Book Preferred format: CD-ROM Type of Requester: Business I Agree to pay all applicable fees 71...

293

BPA-2010-02000-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electric I am writing this to request photocopies of Chet's Electric certified payroll records pursuant to ORS 279.354 regarding BPA Aircraft Hanger in Redmond, OR. I am requesting...

294

BPA-2012-01716-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

aude@law.stanford.edu LOG 7J Description of Request: I hereby request copies of all records containing information about the amount of eminent domain or condemnation proceedings...

295

BPA-2012-01592-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Portland, OR 97208 04 Re: Freedom of Information Act Request- North Steens 230-kV Transmission Line Project Dear Ms. Munro: This is a request under the Freedom of Information Act...

296

SIO Request for Information Page 1 5/21/2013 Request for Information  

E-Print Network [OSTI]

SIO Request for Information Page 1 5/21/2013 Request for Information The mission of the UW to gather information from groups or individuals interested in using the services of the office. Requests for Information for use of the UW-Madison Shanghai Innovation Office SIO Request for Information Page 2 5

Wisconsin at Madison, University of

297

Information Request Yucca Mountain Site  

Broader source: Energy.gov (indexed) [DOE]

, 2008 , 2008 TO: Sue Tierney, Phil Niedzielski-Eichner, Skila Harris FROM: Chris Kouts SUBJECT: Information Request As requested, enclosed is the additional information you requested last week regarding use of engineered barriers. Please let me know if you need additional information or have any questions. A,4- -/0 7 The Suitability of the Yucca Mountain Site and the Issue of Natural Barriers as the Principal Barriers for Demonstrating Safety This paper addresses two issues that are frequently raised concerning the suitability of the Yucca Mountain site for development as a repository. The first issue is that the Yucca Mountain site is technically unsound and that an engineered barrier system is required because the site is not capable of protecting public health and safety. The second issue is

298

NNSA FY14 BUDGET REQUEST  

National Nuclear Security Administration (NNSA)

FY14 BUDGET REQUEST FY14 BUDGET REQUEST We're keeping the American people safe. President Obama has laid out the most ambitious view of nuclear security in decades. Our nonproliferation, counterterrorism, and modern-day nuclear deterrent programs keep the American people safe every day. The President remains committed to a safe, secure, and reliable nuclear deterrent, and his FY14 budget provides $7.9 billion for NNSA's weapons activities. o Our Life Extension Programs (LEPs) are moving forward to ensure the aging American nuclear weapons deterrent remains safe, secure, and effective. $1 billion is requested in FY14 to directly support these programs. The W76-1 LEP, now in Phase 6.6 full

299

FY2012 EERE Congressional Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE)

Fiscal Year 2012 budget request from the Department of Energys Office of Energy Efficiency and Renewable Energy

300

Request for donations 1. Donation project  

E-Print Network [OSTI]

Request for donations 1. Donation project Cheiron School 2013 2. Activity to be supported (1. Donation procedures See

Kazama, Hokto

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Delta Faucet: Data Request (2010-SW-1603)  

Broader source: Energy.gov [DOE]

DOE requested test data from Delta Faucet Corporation for Delta Faucet's showerhead model "In2ition 75582".

302

Record of Decision for the Electrical Interconnection of the BP Cherry Point Cogeneration Project (DOE/EIS-0349) (11/10/04)  

Broader source: Energy.gov (indexed) [DOE]

BP Cherry Poi BP Cherry Poi nt Cogeneration Project DECISION The Bonneville Power Administration (Bonneville) has decided to implement the proposed action identified in the BP Cherry Point Cogeneration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0349, August 2004). Under the proposed action, Bonneville will offer contract terms for interconnection of the BP Cherry Point Cogeneration Project (Project) with the Federal Columbia River Transmission System (FCRTS), as requested by BP West Coast Products, LLC (BP) and proposed in the FEIS. The proposed Project involves constructing and operating a new 720-megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 265-acre site adjacent to BP's existing Cherry Point Refinery between Ferndale and

303

PowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks  

E-Print Network [OSTI]

. Cooling costs can be pro- hibitive (consider the high power budgets of industry-standard six- foot serverPowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks Li Shang Li,peh,jha}@ee.princeton.edu Niraj K. Jha ABSTRACT Power consumption is a critical issue in interconnection network design, driven

Shang, Li

304

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line- based communication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Wu, Hui

305

Predictions, Challenges, and Opportunities in CMOS Compatible On-Chip Optical Interconnect  

E-Print Network [OSTI]

to a few picoseconds. IV. ELECTRICAL VS. OPTICAL INTERCONNECTS Different criteria used in the design of the . Friedman Department of Electrical and Computer Engineering University of Rochester, Rochester, New York for electrical interconnect. Predictions of the performance of CMOS compatible optical devices are made based

Friedman, Eby G.

306

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores  

E-Print Network [OSTI]

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores Li Chen on long interconnects and must be addressed during manufacturing testing. External testing for crosstalk is expensive due to the need for high-speed testers. Built-in self-test, while eliminating the need for a high

California at San Diego, University of

307

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link  

E-Print Network [OSTI]

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link a technique that enables the extraction and modeling of some of the channel's optoelectronic characteristics and optoelectronic com- ponents utilized in the link. 1. Introduction In the last decade optical interconnects have

Esener, Sadik C.

308

The Impact of Dynamic Directories on Multicore Interconnects MATT SCHUCHHARDT, Northwestern University  

E-Print Network [OSTI]

consumption by up to 37.3% (22.9% on average for scientific workloads, and 8.0% for Map-Reduce). 1 Directories on the performance, power, and energy consumption of a multicore processor. We show its. This eliminates a large fraction of on-chip interconnect traversals, thus reducing interconnect power and energy

Kuzmanovic, Aleksandar

309

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line-based commu- nication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Huang, Michael C.

310

Federal Utility Partnership Working Group - Utility Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

WORKING GROUP - Utility Interconnection Panel M. Renee Jewell, Program/Energy Manager, & Contracting Officer, Forest Service (reneejewell@fs.fed.us) SCENARIO: Fed Agencies had Solar PV Projects To Connect with Utility in California * United States (US) Forest Service (FS) - 1 small Solar Photovoltaic (PV) project; and - 1 small Renewable project (Solar PV) exporting energy to grid. * U.S. National Park Service (NPS) - 24 Small Solar Photovoltaic projects. * U.S. Dept. of Veterans Affairs (VA) - 6 Renewable generation projects of different sizes. FS Region 5 (California) - Solar Photovoltaic Installations Solar PV Project @ Mono Lake Visitor Center (Inyo NF) Solar PV Project (net exporter) @ San Dimas Technology and Development Center SITUATION - Utility Wanted Feds to Sign Its

311

Geothermal Power and Interconnection: The Economics of Getting to Market  

SciTech Connect (OSTI)

This report provides a baseline description of the transmission issues affecting geothermal technologies. The report begins with a comprehensive overview of the grid, how it is planned, how it is used, and how it is paid for. The report then overlays onto this 'big picture' three types of geothermal technologies: conventional hydrothermal systems; emerging technologies such as enhanced engineered geothermal systems (EGS) and geopressured geothermal; and geothermal co-production with existing oil and gas wells. Each category of geothermal technology has its own set of interconnection issues, and these are examined separately for each. The report draws conclusions about each technology's market affinities as defined by factors related to transmission and distribution infrastructure. It finishes with an assessment of selected markets with known geothermal potential, identifying those that offer the best prospects for near-term commercial development and for demonstration projects.

Hurlbut, D.

2012-04-01T23:59:59.000Z

312

Catalytic bipolar interconnection plate for use in a fuel cell  

DOE Patents [OSTI]

A bipolar interconnection plate for use between adjacent fuel cell units in a stacked fuel cell assembly. Each plate is manufactured from an intermetallic composition, examples of which include NiAl or Ni.sub.3 Al which can catalyze steam reforming of hydrocarbons. Distributed within the intermetallic structure of the plate is a ceramic filler composition. The plate includes a first side with gas flow channels therein and a second side with fuel flow channels therein. A protective coating is applied to the first side, with exemplary coatings including strontium-doped or calcium-doped lanthanum chromite. To produce the plate, Ni and Al powders are combined with the filler composition, compressed at a pressure of about 10,000-30,000 psi, and heated to about 600.degree.-1000.degree. C. The coating is then applied to the first side of the completed plate using liquid injection plasma deposition or other deposition techniques.

Lessing, Paul A. (Idaho Falls, ID)

1996-01-01T23:59:59.000Z

313

Gold-based electrical interconnections for microelectronic devices  

DOE Patents [OSTI]

A method of making an electrical interconnection from a microelectronic device to a package, comprising ball or wedge compression bonding a gold-based conductor directly to a silicon surface, such as a polysilicon bonding pad in a MEMS or IMEMS device, without using layers of aluminum or titanium disposed in-between the conductor and the silicon surface. After compression bonding, optional heating of the bond above 363 C. allows formation of a liquid gold-silicon eutectic phase containing approximately 3% (by weight) silicon, which significantly improves the bond strength by reforming and enhancing the initial compression bond. The same process can be used for improving the bond strength of Au--Ge bonds by forming a liquid Au-12Ge eutectic phase.

Peterson, Kenneth A. (Albuquerque, NM); Garrett, Stephen E. (Albuquerque, NM); Reber, Cathleen A. (Corrales, NM); Watson, Robert D. (Tijeras, NM)

2002-01-01T23:59:59.000Z

314

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings  

Broader source: Energy.gov (indexed) [DOE]

37: Interconnection of the Buffalo Ridge III Wind Project, 37: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota Summary This EIS evaluates the environmental impacts of a proposal to interconnect the Heartland Wind, LLC, proposed Buffalo Ridge III Wind Project in Brookings and Deuel Counties, South Dakota, to DOE's Western Area Power Administration transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 29, 2012 EIS-0437: Notice of Cancellation of an Environmental Impact Statement Proposed Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD

315

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project,  

Broader source: Energy.gov (indexed) [DOE]

8: Interconnection of the Proposed Hermosa West Wind Farm 8: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY SUMMARY This EIS will evaluate the environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, with DOE's Western Area Power Administration's existing Craig-Ault 345-kilovolt transmission line. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 5, 2012 EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY January 14, 2010 EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings

316

Change Request Forms | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Change Request Forms | National Nuclear Security Administration Change Request Forms | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Change Request Forms Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Change Request Forms Change Request Forms

317

DUF6 Final EIS Document Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EIS Request Form EIS Request Form Final EIS Document Request Form Use the form below to order copies of the DUF6 Conversion Facility Final EISs and Records of Decision. Step 3 Select the EIS that you want to receive. Select one of the three options below. My request applies to the Paducah Conversion Facility EIS My request applies to the Portsmouth Conversion Facility EIS My request applies to both the Paducah and the Portsmouth Conversion Facility EISs Step 1 Request EIS copies. Choose one or more of the following: Mail me a compact disc (CD-ROM) of the Final EIS and Record of Decision. Mail me a printed copy of the Final EIS and Record of Decision. Step 2 Enter your personal information. You must submit your full name and complete address including zip code to receive postal mail. You must provide an email address if you want to receive email notifications.

318

p r o g r e s s r e p o r t s Interconnect: A Fundamental Constraint  

E-Print Network [OSTI]

the greatest amounts of area, delay, and energy. With interconnection require- ments scaling faster than. Since typical, logical communication structures have interconnection demands that are greater than two-dimensional VLSI substrates naturally sup- port, interconnection requirements grow faster than logic and become

Haile, Sossina M.

319

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343)  

SciTech Connect (OSTI)

The COB Energy Facility would be constructed on a site near the rural community of Bonanza, in Klamath County, Oregon. Generating components of the project would be constructed in either one or two phases, including four air-cooled combustion turbine generators fueled with natural gas, four heat recovery steam generators, and two steam turbines. Additional facilities include a new 7.2-mile-long 500-kV transmission line, a new 4.1-mile-long natural gas pipeline, a 2.8-mile-long water pipeline, a 20-acre wastewater evaporation pond or a 3,770-foot-long irrigation pipeline to deliver wastewater to a 31-acre pasture, a 4.7-acre stormwater infiltration basin, a 1.5-acre stormwater retention pond, and various tanks, buildings, exhaust stacks, parking, and storage areas. Natural gas to fuel the combustion turbines would be supplied by way of a new 4.1-mile-long, 20-inch-diameter pipeline from a Gas Transmission Northwest's Bonanza Compressor Station. The new pipeline would be constructed within private easements adjacent to or near Klamath County road rights-of-way. Although COB Energy Facility generators would use air-cooled condensers, the project would use an average of 72 gallons per minute for steam production and station service, up to a maximum of 210 gallons per minute. The source of this water would be one existing and two new wells near the project site, drawing from a deep aquifer consistent with a State of Oregon water right permit expected to be incorporated into the State energy facility site certificate. Process wastewater would either be used to irrigate pasture or held in a lined pond to evaporate. Sanitary water would be routed to an onsite septic tank then discharged to a leach field. No wastewater would be discharged to surface waters. The COB Energy Facility would interconnect to the FCRTS at Captain Jack Substation, 7.2 miles south of the project site. PERC would construct a new 500-kV transmission line from the project site to Captain Jack Substation. Part of the transmission line would cross public land managed by the Bureau of Land Management. BPA would install additional electrical equipment at Captain Jack Substation. At this time, PERC has not requested specific points of delivery.

N /A

2004-08-20T23:59:59.000Z

320

Study of metallic materials for solid oxide fuel cell interconnect applications.  

SciTech Connect (OSTI)

Metallic interconnect acts as a gas separator and a gas distributor and therefore, it needs to function adequately in two widely different environments. The interconnect material will be exposed to air on one side and natural gas or coal-derived synthesis gas on the other side. The viable material for the interconnect application must be resistant not only to oxidation but also carburization in hydrocarbon containing low-oxygen environments. In addition, the scales that develop on the exposed surfaces must possess adequate electrical conductivity for them to function as current leads over long service life of the fuel cell. This report addresses five topics of interest for the development of metallic interconnects with adequate performance in fuel cells for long service life. The research conducted over the years and the conclusions reached were used to identify additional areas of research on materials for improved performance of components, especially metallic interconnects, in the complex fuel cell environments. This report details research conducted in the following areas: measurement of area specific electrical resistivity, corrosion performance in dual gas environments by experiments using alloy 446, long term corrosion performance of ferritic and austenitic alloys in hydrogen and methane-reformed synthesis fuel-gas environments, approaches to reduce the area resistance of metallic interconnect, and reduction of electrical resistivity of alumina scales on metallic interconnect. Based on the key requirements for metallic interconnects and the data developed on the corrosion behavior of candidate materials in meeting those requirements, several areas are recommended for further research to develop metallic interconnects with acceptable and reliable long-term performance in solid oxide fuel cells.

Natesan, K.; Zeng, Z.; Nuclear Engineering Division

2009-04-24T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

FY 2007 Congressional Budget Request  

Broader source: Energy.gov (indexed) [DOE]

state tables state tables preliminary Department of Energy FY 2007 Congressional Budget Request February 2006 Printed with soy ink on recycled paper Office of Chief Financial Officer state tables preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. State Index Page Number FY 2007 Congressional Budget 1/31/2006 Department Of Energy (Dollars In Thousands) 12:09:13PM Page 1 of 2 FY 2005 Appropriation FY 2006 Appropriation FY 2007 Request State Table 1 1 $32,439

322

Nuclear-renewable hybrid energy systems: Opportunities, interconnections, and needs  

SciTech Connect (OSTI)

As the U.S. energy system evolves, the amount of electricity from variable-generation sources is likely to increase, which could result in additional times when electricity demand is lower than available production. Thus, purveyors of technologies that traditionally have provided base-load electricitysuch as nuclear power plantscan explore new operating procedures to deal with the associated market signals. Concurrently, innovations in nuclear reactor design coupled with sophisticated control systems now allow for more complex apportionment of heat within an integrated system such as one linked to energy-intensive chemical processes. This paper explores one opportunity nuclear-renewable hybrid energy systems. These are defined as integrated facilities comprised of nuclear reactors, renewable energy generation, and industrial processes that can simultaneously address the need for grid flexibility, greenhouse gas emission reductions, and optimal use of investment capital. Six aspects of interaction (interconnections) between elements of nuclear-renewable hybrid energy systems are identified: Thermal, electrical, chemical, hydrogen, mechanical, and information. Additionally, system-level aspects affect selection, design, and operation of this hybrid system type. Throughout the paper, gaps and research needs are identified to promote further exploration of the topic.

Mark F. Ruth; Owen R. Zinaman; Mark Antkowiak; Richard D. Boardman; Robert S. Cherry; Morgan D. Bazilian

2014-02-01T23:59:59.000Z

323

Pulsed laser planarization of metal films for multilevel interconnects  

SciTech Connect (OSTI)

Multilevel interconnect schemes for integrated circuits generally require one or more planarization steps, in order to maintain an acceptably flat topography for lithography and thin-film step coverage on the higher levels. Traditional approaches have involved planarization of the interlevel insulation (dielectric) layers, either by spin-on application (e.g., polyimide), or by reflow (e.g., phosphosilicate glass). We have pursued an alternative approach, in which each metal level is melted (hence planarized) using a pulsed laser prior to patterning. Short (approx.1 ..mu..s) pulses are used to preclude undesirable metallurgical reactions between the film, adhesion or barrier layer, and dielectric layer. Laser planarization of metals is particularly well suited to multilevel systems which include ground or power planes. Results are presented for planarization of gold films on SiO/sub 2/ dielectric layers using a flashlamp-pumped dye laser. The pulse duration is approx.1 ..mu..s, which allows the heat pulse to uniformly penetrate the gold while not penetrating substantially through the underlying SiO/sub 2/ (hence not perturbing the lower levels of metal). Excellent planarization of the gold films is achieved (less than 0.1 ..mu..m surface roughness, even starting with extreme topographic variations), as well as improved conductivity. To demonstrate the process, numerous planarized two-layer structures (transmission lines under a ground plane) were fabricated and characterized. 9 refs., 2 figs.

Tuckerman, D.B.; Schmitt, R.L.

1985-05-01T23:59:59.000Z

324

University of Connecticut, Office of the Registrar, Transcript Request Form Transcript Request Form -University of Connecticut  

E-Print Network [OSTI]

University of Connecticut, Office of the Registrar, Transcript Request Form Transcript Request Form - University of Connecticut Office of the Registrar, Unit 4077T, Storrs, CT 06269-4077T Forms of Connecticut under other names, please indicate them here

Lozano-Robledo, Alvaro

325

WIPP - How to submit a FOIA request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to submit a Freedom of Information Act (FOIA) request FOIA requests to the U.S. Department of Energy Carlsbad Field Office (CBFO) may be submitted by request form, letter, fax, or e-mail. You may contact CBFO at the following address: George W. Hellstrom Freedom of Information Act/Privacy Act Public Liaison U.S. Department of Energy Carlsbad Field Office P.O. Box 3090 4021 National Parks Highway Carlsbad, New Mexico 88221-3090 foialiaison@ FOIA requests may be mailed or faxed to (505) 234-7025, e-mailed to the Freedom of Information Act /Privacy Act Public Liaison, or submitted electronically using the FOIA Request form. Clearly mark the envelope, fax, or e-mail "Freedom of Information Act request." Describe the records you are requesting as completely and accurately as possible, and provide your name, address, and telephone number. A telephone call between the requester and the FOIA contact person may be necessary to clarify a request and expedite processing time.

326

BPA-2011-01513-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

indicating any and all projects worked on by Scott Richard Rolf, Senior Policy Advisor. z- As used in this request, "projects" means any negotiations, contracts, or other...

327

PIA - Human Resources - Personal Information Change Request ...  

Office of Environmental Management (EM)

Request - Idaho National Engineering Laboratory More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM...

328

BPA-2012-00676-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University Professor Address: Phone: FAX: Email: Description of Request: Copy of BPA Substation Design Standards - specifically the chapter (or the part) related to...

329

Request for Information (RFI): Advanced Manufacturing Office...  

Broader source: Energy.gov (indexed) [DOE]

Advanced Manufacturing Office (AMO) Software Tools Request for Information (RFI): Advanced Manufacturing Office (AMO) Software Tools July 25, 2014 - 1:00pm Addthis Funding: This...

330

Request For Information Regarding Categorical Exclusions: Guidelines...  

Broader source: Energy.gov (indexed) [DOE]

Exclusions: Guidelines Request For Information Regarding Categorical Exclusions: Guidelines The U.S. Department of Energy (DOE) intends to update its National Environmental Policy...

331

BPA-2012-01173-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enterprise Program Director. OCB requests complete copies of the original ARAMARK food service contract including all exhibits and all renewals thereof connected to the...

332

BPA-2010-02087-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Description of Request: I would like to retrieve historical, hourly generation from hydroelectric facilities which operate in BPA's footprint. This data is made available on BPA's...

333

Energy Department Requests Proposals for Advanced Scientific...  

Energy Savers [EERE]

27, 2005 - 4:55pm Addthis WASHINGTON, DC - The Department of Energy's Office of Science and the National Nuclear Security Administration (NNSA) have issued a joint Request...

334

BPA-2012-00805-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3- 1 et seq ("FOIA"), I request electronic copies of Department of the LOG g Energy contracting documents. Specifically: i) 11 Justifications for Other Than Full and Open...

335

Request an Inspection of User Electrical Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Request for an Electrical Equipment Inspection All APS User electronic and electrical equipment must be inspected before use in an experiment. Please ask your beamline to make...

336

Fiscal Year 2013 Budget Request Briefing  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Courtesy of Enel Green Power - North America Fiscal Year 2013 Budget Request Briefing March 13, 2012 Change photo Glass Buttes, OR (DOE) Energy Efficiency & Renewable Energy...

337

BPA-2011-00698-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7202145856 FAX: 3039886409 Email: bmcbee@bentekenergy.com Description of Request: Hello, I am seeking data associated with hourly imports and exports of electricity to and...

338

NREL: Business Opportunities - Current Solicitations/Request...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The National Renewable Energy Laboratory (NREL), which is managed and operated by the Alliance for Sustainable Energy, LLC, frequently posts Requests for Proposals (RFP). Please...

339

BPA-2011-01724-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Bonneville's actions on species listed under the Endangered Species Act and wetlands. I request a waiver or reduction of fees because the discolsure is "likely to...

340

Reliable low latency I/O in torus-based interconnection networks  

E-Print Network [OSTI]

In today's high performance computing environment I/O remains the main bottleneck in achieving the optimal performance expected of the ever improving processor and memory technologies. Interconnection networks therefore combines processing units...

Azeez, Babatunde

2007-04-25T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

An energy vision: the transformation towards sustainability --interconnected challenges and solutions  

E-Print Network [OSTI]

consumption levels, lack of energy access, environmental concerns like climate change and air pollution (RCPs) [2 ], the International Energy Agency's World Energy Outlook [3,4 ], and several modeAn energy vision: the transformation towards sustainability -- interconnected challenges

Silver, Whendee

342

Design of Computer Generated Binary Holograms for Free Space Optical Interconnections  

Science Journals Connector (OSTI)

The purpose of this Chapter is to give an introduction to the use of computer generated holograms (CGHs) as free space optical interconnection elements. We will focus mainly on the techniques for designing bin...

I. Montrosset; D. Cojoc; F. Sartori

1997-01-01T23:59:59.000Z

343

A polarizer chip based on CMOS Cu-interconnect for optical telecommunications  

Science Journals Connector (OSTI)

The construction by CMOS Cu-interconnect fabrication technology of an optical chip that performs the function of linear polarization is described. The chip consists of three rows of...

Ko, Cheng-Hao; Lee, Kuei-Jen

2006-01-01T23:59:59.000Z

344

Interconnection of on-site photovoltaic generation to the electric utility. [Conference paper  

SciTech Connect (OSTI)

Electrical interconnection with the local electric utility of small, privately owned, on-site photovoltaic generating systems will be necessary. Legal guidelines exist through PURPA, administered by FERC, to establish interconnection, but economic viability will be the deciding factor in constructing photovoltaic generating systems. Although nationally recognized technical standards do not yet exist for interconnecting photovoltaic generation with an electric utility, most utilities have considered the need for developing cogeneration standards, and a few have developed such standards independently. Additional costs incurred by utilities in providing service interconnections to customers with cogeneration will be passed along to those customers, either as a direct assessment or as part of the applicable rate schedule. An economic-analysis methodology has been developed to allow comparing various possible photovoltaic-generating-system configurations under different utility rate structures and varying economic climates on a consistent basis.

Eichler, C.H.; Kilar, L.A.; Stiller, P.H.

1980-01-01T23:59:59.000Z

345

Fast Algorithms for High Frequency Interconnect Modeling in VLSI Circuits and Packages  

E-Print Network [OSTI]

used in MEMS, RFID and MRAM. We present the first BEM algorithm to extract interconnect inductance with magnetic materials. The algorithm models magnetic characteristics by the Landau Lifshitz Gilbert equation and fictitious magnetic charges...

Yi, Yang

2011-02-22T23:59:59.000Z

346

Modeling and Analysis of Large-Scale On-Chip Interconnects  

E-Print Network [OSTI]

in computer aided design areas. This dissertation presents new methodologies for addressing the above two important challenging issues for large scale on-chip interconnect modeling and analysis: In the past, the standard statistical circuit modeling techniques...

Feng, Zhuo

2010-07-14T23:59:59.000Z

347

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov [DOE]

Presentation covers the topic of "Renewable Generation and Interconnection to the Electrical Grid in Southern California," given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

348

Determination of Interfacial Adhesion Strength between Oxide Scale and Substrate for Metallic SOFC Interconnects  

SciTech Connect (OSTI)

The interfacial adhesion strength between the oxide scale and the substrate is crucial to the reliability and durability of metallic interconnects in SOFC operating environments. It is necessary, therefore, to establish a methodology to quantify the interfacial adhesion strength between the oxide scale and the metallic interconnect substrate, and furthermore to design and optimize the interconnect material as well as the coating materials to meet the design life of an SOFC system. In this paper, we present an integrated experimental/analytical methodology for quantifying the interfacial adhesion strength between oxide scale and a ferritic stainless steel interconnect. Stair-stepping indentation tests are used in conjunction with subsequent finite element analyses to predict the interfacial strength between the oxide scale and Crofer 22 APU substrate.

Sun, Xin; Liu, Wenning N.; Stephens, Elizabeth V.; Khaleel, Mohammad A.

2008-01-21T23:59:59.000Z

349

Solid oxide fuel cell with single material for electrodes and interconnect  

DOE Patents [OSTI]

A solid oxide fuel cell having a plurality of individual cells. A solid oxide fuel cell has an anode and a cathode with electrolyte disposed therebetween, and the anode, cathode and interconnect elements are comprised of substantially one material.

McPheeters, Charles C. (Naperville, IL); Nelson, Paul A. (Wheaton, IL); Dees, Dennis W. (Downers Grove, IL)

1994-01-01T23:59:59.000Z

350

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

351

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos  

E-Print Network [OSTI]

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos Semiconductor ABSTRACT We present the design of an intelligent optoelectronic chip carrier (IOCC the sapphire. The result is an optoelectronic package that supports full CMOS performance, is mechanically

Bakos, Jason D.

352

Process based cost modeling of emerging optoelectronic interconnects : implications for material platform choice  

E-Print Network [OSTI]

Continuously increasing demand for processing power, storage capacity, and I/O capacity in personal computing, data network, and display interface suggests that optical interconnects may soon supplant copper not only for ...

Liu, Shan, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

353

High-performance parallel processors based on star-coupled wavelength division multiplexing optical interconnects  

DOE Patents [OSTI]

As the performance of individual elements within parallel processing systems increases, increased communication capability between distributed processor and memory elements is required. There is great interest in using fiber optics to improve interconnect communication beyond that attainable using electronic technology. Several groups have considered WDM, star-coupled optical interconnects. The invention uses a fiber optic transceiver to provide low latency, high bandwidth channels for such interconnects using a robust multimode fiber technology. Instruction-level simulation is used to quantify the bandwidth, latency, and concurrency required for such interconnects to scale to 256 nodes, each operating at 1 GFLOPS performance. Performance scales have been shown to .apprxeq.100 GFLOPS for scientific application kernels using a small number of wavelengths (8 to 32), only one wavelength received per node, and achievable optoelectronic bandwidth and latency.

Deri, Robert J. (Pleasanton, CA); DeGroot, Anthony J. (Castro Valley, CA); Haigh, Ronald E. (Arvada, CO)

2002-01-01T23:59:59.000Z

354

Design of a decentralized detection filter for a class of interconnected LTI systems  

E-Print Network [OSTI]

In this thesis, we consider the problem of designing a decentralized detection filter for a class of homogeneous interconnected systems. In this class of systems, all subsystems have an identical structure. A fault in a subsystem propagates via...

Shankar, Shamanth

2001-01-01T23:59:59.000Z

355

Simulation of Bio-syngas Production from Biomass Gasification via Pressurized Interconnected Fluidized Beds  

Science Journals Connector (OSTI)

Bio-syngas production from biomass gasification via pressurized interconnected fluidized...T g), gasification pressure (p g) and steam to biomass ratio (S/B) on bio-syngas production

Fei Feng; Guohui Song; Laihong Shen

2014-01-01T23:59:59.000Z

356

OE Releases "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012"  

Broader source: Energy.gov [DOE]

The "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012" document, which is now available for downloading, is a compilation of publicly-available data on transmission constraints and congestion for the period 2009 through 2012.

357

E-Print Network 3.0 - at-speed interconnect bist Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Explorit Topic List Advanced Search Sample search results for: at-speed interconnect bist Page: << < 1 2 3 4 5 > >> 1 JOURNAL OF ELECTRONIC TESTING: Theory and Applications 19,...

358

STATEMENT OF CONSIDERATIONS REQUEST BY CRA Y INC (CRA Y) FOR AN ADVANCE WAIVER OF  

Broader source: Energy.gov (indexed) [DOE]

CRA Y INC (CRA Y) FOR AN ADVANCE WAIVER OF CRA Y INC (CRA Y) FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS TO INVENTIONS MADE UNDER SUBCONTRACT NO. B580786, DOE WAIVER NO. WeAl 2010-012. The Petitioner, Cray, has requested a waiver of all domestic and foreign patent rights to inventions that may be conceived or first actually reduced to practice in the course of Cray's work. under Subcontract No B580786 entitled "ACES - Cray Interconnection Network Project" with the U.S. Department of EnergylNational Nuclear Security Administration (DOElNNSA). This contract involves joint analysis of Network Interface chips, their features and how the features map to application performance. The joint analysis will be completed by Cray and ACES. The Alliance for Computing at Extreme Scale (ACES) is a formal

359

STATEMENT OF CONSIDERATIONS REQUEST BY DELPHI AUTOMOTIVE SYSTEMS FOR AN ADVANCE WAIVER OF  

Broader source: Energy.gov (indexed) [DOE]

1NT41022; W(A)-03-022; CH-1146 1NT41022; W(A)-03-022; CH-1146 As set out in the attached waiver petition and in subsequent discussions with DOE Patent Counsel, Delphi Automotive Systems, L.L.C (Delphi) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above subject cooperative agreement. The waiver will apply to inventions made by Delphi employees and its subcontractors' employees, regardless of tier, except inventions made by subcontractors eligible to retain title to inventions pursuant to P.L. 96-517, as amended, and National Laboratories. Referring to item 2 of Delphi's petition, the purpose of this agreement is the development of interconnects for solid oxide fuel cell systems. Delphi will investigate materials for the metal

360

STATEMENT OF CONSIDERATIONS REQUEST BY GENERAL ELECTRIC COMPANY FOR AN ADVANCE WAIVER  

Broader source: Energy.gov (indexed) [DOE]

DOMESTIC AND FOREIGN PATENT RIGHTS UNDER NREL DOMESTIC AND FOREIGN PATENT RIGHTS UNDER NREL SUBCONTRACT NO. NAD-1-30605-01 UNDER DOE CONTRACT NO. DE- AC36-98GO10337; W(A)-03-034; CH-1158 As set out in the attached waiver petition and in subsequent discussions with DOE Patent Counsel, General Electric Company (GE) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above-identified subcontract by its employees and its subcontractors' employees, regardless of tier, except inventions made by subcontractors eligible to retain title to inventions pursuant to P.L. 96-517, as amended, and National Laboratories. Referring to item 2 of GE's waiver petition, the purpose of this agreement encompasses the analysis, design, fabrication and testing of a universal interconnect system for interfacing

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Manufacturing Analysis of SOFC Interconnect Coating Processes - NexTech Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manufacturing Analysis of SOFC Manufacturing Analysis of SOFC Interconnect Coating Processes- NexTech Materials Background The adoption of high-temperature metal alloys as alternatives to traditional ceramic interconnect materials provides a cost effective path for the production of solid oxide fuel cells (SOFCs). Low-cost and effective protective coatings must be developed for the metallic system and stack components for SOFCs to be economical. Since current

362

Browning: Email in Response to Smart Grid Request for Information...  

Broader source: Energy.gov (indexed) [DOE]

Browning: Email in Response to Smart Grid Request for Information Browning: Email in Response to Smart Grid Request for Information Email from Stephen Browning explaing the two...

363

Response to several FOIA requests - Renewable Energy. | Department...  

Office of Environmental Management (EM)

Response to several FOIA requests - Renewable Energy. Response to several FOIA requests - Renewable Energy. SCHEDULE FOR CHIEF OF STAFF Wednesday, July 11, 2001...

364

Fuel Cell Technologies Program FY 2013 Budget Request Rollout...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

FY 2013 Budget Request Rollout Washington, DC FUEL CELL TECHNOLOGIES PROGRAM FY 2013 Budget Request Rollout to Stakeholders Sunita Satyapal U.S. Department of Energy Fuel Cell...

365

FY 2014 Environmental Management Budget Request to Congress ...  

Office of Environmental Management (EM)

4 Environmental Management Budget Request to Congress FY 2014 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2014...

366

FY 2014 Budget Request Summary Table | Department of Energy  

Office of Environmental Management (EM)

Summary Table FY 2014 Budget Request Summary Table Summary Table by Appropriations Summary Table by Organization More Documents & Publications FY 2014 Budget Request Statistical...

367

REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Power Plant Docket Records REQUEST FOR RECORDS DISPOSITION AUTHORITY More Documents & Publications PIA - Savannah River Remediation Accreditation Boundary (SRR AB) REQUEST...

368

Video Tutorial for Submitting a 2014 ERCAP Request available  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Video Tutorial for Submitting a 2014 ERCAP Request available Video Tutorial for Submitting a 2014 ERCAP Request available September 17, 2013 (0 Comments) Rushing to meet the...

369

Highlights of the FY 2015 Congressional Budget Request for OE...  

Broader source: Energy.gov (indexed) [DOE]

Budget Request for OE Highlights of the FY 2015 Congressional Budget Request for OE OE drives electric grid modernization and resiliency in the energy infrastructure through...

370

Request for Information: Federal Government Power Purchase Agreements...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information: Federal Government Power Purchase Agreements (PPA) Issues Request for Information: Federal Government Power Purchase Agreements (PPA) Issues Document...

371

Request for Information NBP RFI: Data Access | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information NBP RFI: Data Access Request for Information NBP RFI: Data Access Xcel Energy, a combination electricity and natural gas utility operating in eight...

372

Request for Information (RFI): Clean Energy Manufacturing Topics...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information (RFI): Clean Energy Manufacturing Topics Suitable for a Manufacturing Innovation Institute Request for Information (RFI): Clean Energy Manufacturing Topics...

373

DOE Request for Information - Implementing the National Broadband...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information - Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy DOE Request for Information...

374

Re: Request for Information on Regulatory Burden of DOE Regulations...  

Energy Savers [EERE]

Request for Information on Regulatory Burden of DOE Regulations Re: Request for Information on Regulatory Burden of DOE Regulations Comments from Edison Electric Institute on DOE's...

375

Response to several FOIA requests - Renewable Energy. Demand...  

Energy Savers [EERE]

Demand for Fossil Fuels Response to several FOIA requests - Renewable Energy. Demand for Fossil Fuels Response to several FOIA requests - Renewable Energy. nepdg251500.pdf....

376

Response to several FOIA requests - Renewable Energy. | Department...  

Office of Environmental Management (EM)

Energy. Response to several FOIA requests - Renewable Energy. Response to several FOIA requests - Renewable Energy. Excess Capacity from LADWP Control Area (LADWP, Glendale,...

377

Response to several FOIA requests - Renewable Energy | Department...  

Energy Savers [EERE]

Energy Response to several FOIA requests - Renewable Energy Response to several FOIA requests - Renewable Energy, World Oil Price, 1970-2020 (1999 dollars per barrel) Response to...

378

Response to several FOIA requests - Renewable Energy. | Department...  

Energy Savers [EERE]

Chapter 2 Energy Impacts, nepdg82518500.pdf Response to several FOIA requests - Renewable Energy. More Documents & Publications Response to several FOIA requests -...

379

Response to several FOIA requests - Renewable Energy. | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy. Response to several FOIA requests - Renewable Energy. Response to several FOIA requests - Renewable Energy. National Energy Policy, coal is an important energy resource,...

380

Department of Energy Issues Requests for Applications for Nuclear...  

Energy Savers [EERE]

Issues Requests for Applications for Nuclear-Related Science and Engineering Scholarships and Fellowships Department of Energy Issues Requests for Applications for Nuclear-Related...

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Golden Reading Room: FOIA Requester Service Centers and Public...  

Office of Environmental Management (EM)

FOIA Requester Service Centers and Public Liaisons Golden Reading Room: FOIA Requester Service Centers and Public Liaisons U.S. Department of Energy http:energy.govmanagement...

382

Highlights of the FY 2013 Congressional Budget Request for OE...  

Office of Environmental Management (EM)

for OE Highlights of the FY 2013 Congressional Budget Request for OE The Office of Electricity Delivery and Energy Reliability's FY 2013 budget request continues the commitment...

383

Hydrogen and Fuel Cell Technologies FY 2014 Budget Request Rollout...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen and Fuel Cell Technologies FY 2014 Budget Request Rollout to Stakeholders Hydrogen and Fuel Cell Technologies FY 2014 Budget Request Rollout to Stakeholders Presentation...

384

Office of Nuclear Energy Fiscal Year 2014 Budget Request | Department...  

Office of Environmental Management (EM)

Office of Nuclear Energy Fiscal Year 2014 Budget Request Office of Nuclear Energy Fiscal Year 2014 Budget Request The Office of Nuclear Energy (NE) supports the diverse civilian...

385

Request for Information on Permitting of Transmission Lines:...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

386

AMO Issues Request for Information on Clean Energy Manufacturing...  

Energy Savers [EERE]

Request for Information on Clean Energy Manufacturing Topics, Including Fuel Cell and Hydrogen Applications AMO Issues Request for Information on Clean Energy Manufacturing Topics,...

387

REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy  

Office of Environmental Management (EM)

DISPOSITION AUTHORITY More Documents & Publications REQUEST FOR RECORDS DISPOSITION AUTHORITY Request For Records Disposition Autnority Records Dispostion-Coal Distribution Data...

388

Request for Information: GSA Seeks Innovative Building Technologies...  

Office of Environmental Management (EM)

September 26, 2014 - 10:50am Addthis This request for information is closed. GSA's Green Proving Ground has opened its 2015 Request for Information (RFI) seeking information...

389

BETO Announces Request for Information on Landscape Design for...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

BETO Announces Request for Information on Landscape Design for Sustainable Bioenergy Systems BETO Announces Request for Information on Landscape Design for Sustainable Bioenergy...

390

REQUEST FOR SERVICES --- DOCUMENT RECEIPT No | Department of...  

Broader source: Energy.gov (indexed) [DOE]

FOR SERVICES --- DOCUMENT RECEIPT No Form is used by headquarters offices in the records transfer process to indicate receipt of requested records. REQUEST FOR SERVICES ---...

391

Request For Records Disposition Authority | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Fossil Energy Equity Re-determination Records Request For Records Disposition Authority More Documents & Publications REQUEST FOR RECORDS DISPOSITION AUTHORITY Inspection Report:...

392

Fuel Cell Technologies Program FY 2013 Budget Request Rollout...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Program FY 2013 Budget Request Rollout to Stakeholders Fuel Cell Technologies Program FY 2013 Budget Request Rollout to Stakeholders Presentation by Sunita Satyapal at the FY 2013...

393

Response to several FOIA requests - Renewable Energy. | Department...  

Energy Savers [EERE]

ABRAHAM Sunday, May 20, 2001. nepdg42514500.pdf Response to several FOIA requests - Renewable Energy. More Documents & Publications Response to several FOIA requests -...

394

SALARY STIPEND REQUEST FOR CSUEU EMPLOYEES  

E-Print Network [OSTI]

SALARY STIPEND REQUEST FOR CSUEU EMPLOYEES HUMAN RESOURCES Workforce Planning | One Washington Administrator--Submit completed request to Workforce Planning in Human Resources, 0046. Article 20 for Eligibility Sr. Workforce Planning Analyst Signature Phone: Date: HR: 07/01/08 #12;

Eirinaki, Magdalini

395

UW MEDICINE Referral Request UW Medicine  

E-Print Network [OSTI]

UW MEDICINE Referral Request PT.NO NAME DOB UW Medicine Harborview Medical Center ­ UW Medical MEDICINE REFERRAL REQUEST *U2394* *U2394* WHITE ­ MEDICAL RECORD UH2394 REV NOV 11 Thank you for referring. For information about making referrals and/or to complete this form online and print it out go to: http://uwmedicine.org/referrals

Borenstein, Elhanan

396

Poster Request Form Classroom Technology Services, ICIT  

E-Print Network [OSTI]

1 Poster Request Form Classroom Technology Services, ICIT Room Number: 333 Hunter North, Phone: 212-772-4943, Fax: 212-772-5626 Email: av_res@hunter.cuny.edu Poster requests must be submitted three (3) days: _________________________________________________ Phone Number: ________________________________________________ Number of Posters Needed

Qiu, Weigang

397

Information Governance Freedom of Information Request Form  

E-Print Network [OSTI]

Information Governance Freedom of Information Request Form foi@salford.ac.uk http://www.infogov.salford.ac.uk Details of the applicant Name: Address: Post code: Tel. No.: Email: Description of information requested Please provide a description of the information you would like to receive, please be as specific

Romano, Daniela

398

REQUEST FOR INFORMATION Student Information System  

E-Print Network [OSTI]

REQUEST FOR INFORMATION Student Information System This form is to be used by those requesting information from the Registrar's Office. Federal privacy regulations require strict monitoring of access to student information. PERSONS OR ORGANIZATIONS MUST DEMOSTRATE THAT THE INFORMATION IS NEEDED

Thaxton, Christopher S.

399

The NERSC Allocation Request Form (ERCAP)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NIM (NERSC Information Management portal) NIM (NERSC Information Management portal) Awarded projects Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 How to Submit a 2014 ERCAP Request Home » For Users » Accounts & Allocations » Allocations » Allocation Request Form (ERCAP) Show All | 1 2 3 4 5 ... 16 | Next » The NERSC Allocation Request Form (ERCAP) Requests to use NERSC resources are submitted annually via a web form known as the ERCAP (Energy Research Computing Allocations Process) Request Form.

400

Social media request | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

About Energy.gov » Web Policies » Social Media » Social media About Energy.gov » Web Policies » Social Media » Social media request Social media request Please fill out the information below in order to request access to a social media application or to have an existing account verified as an official Department of Energy presence. Please wait for a response from the Office of Digital Strategy before proceeding with establishing an account. Contact information First name * Last name * Title * Office * Email address * Phone number * Are you authorized to make this request or have you received the proper approvals to do so? * No, I'm not authorized Yes, I'm authorized Application Social media application(s) you want to utilize * Facebook LinkedIn Slideshare Socrata Twitter Instagram Storify Myspace SurveyMonkey Request a tool we don't currently offer

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Requesting a Revision to PUB-3000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Requesting a Change to the ES&H Manual Requesting a Change to the ES&H Manual The following procedure describes the process for making changes to Berkeley Lab's ES&H Manual (PUB-3000). It identifies Responsible Authors who participate in the revision process. A request to revise the ES&H Manual may be initiated by any Berkeley Lab employee; however, all requests must be sent to the Responsible Author and approved by the ES&H Manual Manager, Mike Wisherop. If you wish to request a change to a PUB-3000 chapter, follow these steps: Contact the Responsible Author for the chapter in need of revision. Submit PUB-3000 revisions to the Responsible Author and the ES&H Manual Manager. Direct all questions or comments concerning ES&H Manual content to the ES&H Manual Manager.

402

Requesting a Digital ID | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Requesting a Digital ID Requesting a Digital ID Requesting a Digital ID Step One - Registering with MIS To request a DOE Digital Identity you must first register in DOE's Management Information System (MIS) by going to https://mis.doe.gov, selecting "Requesting Access" and following the onscreen instructions. Note: DOE Federal employees are already registered and do not need to complete this step, they may skip to step 2. During the registration process you will be required to search for, and select, a DOE sponsor. Your DOE sponsor is the DOE federal employee that is certifying that you have a recognized relationship with the Department and have a valid need for a DOE Digital Identity. For contractors this person is often your Contract Task Manager, Contracting Officer's Representatives

403

Frequently Requested Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Freedom of Information Act » Documents Freedom of Information Act » Documents » Frequently Requested Documents Frequently Requested Documents This is an index of frequently requested documents provided by the Department of Energy Headquarters and Field Organizations. Headquarters (HQ) DOE Corporate Overview - 2012 FOIA Requests Received by DOE HQ in 2008 FOIA Requests Received by DOE HQ in 2009 FOIA Responses Processed by DOE HQ in 2009 DOE Transition Documents - 2008 Modifications 001 thru 085 to DOE Contract #DEAC13-02GJ79491 DOE Contract #DEAC13-02GJ79491 Freedom of Information & Privacy Act Group - Enron Documents Sylvania Corporation, Hicksville, NY and Bayside, NY - Additional Sylvania Corporation, Hicksville, NY and Bayside, NY documents Secretary of Energy's Recusal Memorandum for the Secretary on the Determination to Grant a Limited

404

REQUEST FOR RECORDS DISPOSITION AUTHORITY  

Broader source: Energy.gov (indexed) [DOE]

m m - REQUEST FOR RECORDS DISPOSITION AUTHORITY (See Instructions on reverse) GENERAL SERVICES ADMINISTRATION N A T I O N A L ARCHIVES AND RECORDS SERVICE, WASHINGTON, DC 20408 1. F R O M ( A g e n c y o r e s t a b l i s h m e n t ) jepartment of Energy 2. MAJOR S U B D I V I S I O N Oak Ridse Operations Office 3. M I N O R S U B D I V I S I O N 4 . N A M E O F PERSON W I T H W H O M T O C O N F E R ( 5 . T E L E P H O N E E X T . L E A V E B L A N K - JOB N O . d/-d33P PO- ZJ - - - - p p D A T E R E C E I V E D p - NOTIFICATION TO AGENCY In accordance with the provisions of 44 U.S.C. 3303a the disposal request, including amendments, is approved except for items that may be marked "disposition not approved" or "withdrawn" in column 10. If no records are proposed for disposal, the signature of the Archivist is not required. - DATE ARCHIVIST

405

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

N /A

2004-10-21T23:59:59.000Z

406

Microsoft Word - CR-AH Request Form.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cleanroom After-Hours Request Form Personal Contact Information Date Name Email Phone Project Number...

407

Loan Loss Reserve Request for ProposalsTemplate  

Broader source: Energy.gov [DOE]

Template to request for proposals for residential energy efficiency loan facilities. Author: Energy Finance Corp

408

Plastic deformation in Al (Cu) interconnects stressed by electromigration and studied by synchrotron polychromatic X-ray microdiffraction  

E-Print Network [OSTI]

Plastic deformation in Al (Cu) interconnects stressed bygrain orientation [7], study plastic deformation [12-15] andThis aspect of EM-induced plastic deformation in grains

Chen, Kai; Advanced Light Source; UCLA

2008-01-01T23:59:59.000Z

409

REQUEST FOR RECORDS DISPOSITION AUTHORITY  

Broader source: Energy.gov (indexed) [DOE]

LEAVE BLANK (NARA use only) LEAVE BLANK (NARA use only) JOB NUMBER To: NATIONAL ARCHIVES & RECORDS ADMINISTRATION 8601 ADELPHI ROAD, COLLEGE PARK, MD 20740-6001 Date Received 1. FROM (Agency or establishment) NOTIFICATION TO AGENCY In accordance with the provisions of 44 U.S.C 3303a, the disposition request, including amendments is approved except for items that may be marked "disposition not approved" or "withdrawn" in column 10. 2. MAJOR SUB DIVISION 3. MINOR SUBDIVISION 4. NAME OF PERSON WITH WHOM TO CONFER 5. TELEPHONE DATE ARCHIVIST OF THE UNITED STATES 6. AGENCY CERTIFICATION I hereby certify that I am authorized to act for this agency in matters pertaining to the disposition of its records and that the records proposed for disposal on the attached______page(s) are not needed now for the business of this agency or will not be

410

REQUEST FOR RECORDS DISPOSITION AUTHORITY  

Broader source: Energy.gov (indexed) [DOE]

instructions on reverse) instructions on reverse) L E A V E B L A N K JOB NO. #/-Y3Y-ff-L GENERAL SERVICES ADMINISTRATION NATIONAL ARCHIVES AND RECORDS SERVICE, WASHINGTON, DC 20408 1. f R O M (Agency orertabluhment) lepartment of Energy 2. M N O R SUBDIVISION 3. M I N O R SUBDIVISION - . ,#q/FEF 4. NAME OF P ~ R S O N WITH WHOM TO CONFER 15. TELEPHONE EXT. 1 hereby certify that I am authorized to act for this agency in matters pertaining to the disposal of the agency's records; that the records proposed for disposal in this Request of page(s) are not now needed for the business of this .agency or will not be needed after the retention periods specified; and that written concurrence from the General Accounting Office, if required under the prov~sions of Title 8 of the GAO Manual for Guidance of Federal Agenctes, is

411

Information requested in Protocol No  

Broader source: Energy.gov (indexed) [DOE]

1, 2010 1, 2010 Smart Grid RFI U.S. Department of Energy Office of Electricity Delivery and Energy Reliability 1000 Independence Avenue, SW Room 8H033 Washington, DC 20585 Re: Smart Grid RFI: Addressing Policy and Logistical Challenges In response to the Department of Energy's (DOE) Request for Information regarding smart grid implementation listed in the September 17, 2010 Federal Register, the New York Independent System Operator, Inc. (NYISO) offers the attached white paper entitled "Envisioning a Smarter Grid for New York Consumers." This white paper, issued by the NYISO in September 2010, was filed at the New York Public Service Commission (NYPSC) in response to a call for comments in its Smart Grid Proceeding. 1 The NYISO would also like to bring to the DOE's attention a white paper prepared

412

Request for Proposal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Request for Proposal | National Nuclear Security Administration Request for Proposal | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Request for Proposal Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract >

413

Request for Rehearing and Request for Interim Clarification by David K.  

Broader source: Energy.gov (indexed) [DOE]

Rehearing and Request for Interim Clarification by Rehearing and Request for Interim Clarification by David K. Paylor, Director of the Virginia Department of Environmental Quality Request for Rehearing and Request for Interim Clarification by David K. Paylor, Director of the Virginia Department of Environmental Quality Docket No. EO-05-01: Pursuant to Federal Power Act § 313, David K. Paylor, Director of the Virginia Department of Environmental Quality, through his counsel Robert F. McDonnell, the Attorney General of Virginia, requests rehearing of Order No. 202-05-3 entered by the Secretary of Energy on December 20, 2005. Specifically, Director Paylor requests rehearing based on the following assignments of error: 1. The Secretary erred by holding that the FPA preempts the Clean Air Act and related state laws;

414

Power System Generation and Inter-Connection Planning Model (SUPER) | Open  

Open Energy Info (EERE)

Power System Generation and Inter-Connection Planning Model (SUPER) Power System Generation and Inter-Connection Planning Model (SUPER) Jump to: navigation, search Tool Summary Name: Power System Generation and Inter-Connection Planning Model (SUPER) Agency/Company /Organization: Latin American Energy Organization Sector: Energy Focus Area: Renewable Energy, Hydro Topics: Resource assessment Resource Type: Software/modeling tools Website: www.olade.org/superEn.html References: SUPER website [1] "This model is useful for multi-year electricity system planning studies, making it possible to analyze, optimize, simulate and develop hydrothermal power system expansion plans." References ↑ "SUPER website" Retrieved from "http://en.openei.org/w/index.php?title=Power_System_Generation_and_Inter-Connection_Planning_Model_(SUPER)&oldid=329

415

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

416

Method of bonding an interconnection layer on an electrode of an electrochemical cell  

DOE Patents [OSTI]

An electrochemical cell containing an air electrode, contacting electrolyte and electronically conductive interconnection layer, and a fuel electrode, has the interconnection layer attached by: (A) applying a thin, closely packed, discrete layer of LaCrO[sub 3] particles, doped with an element selected from the group consisting of Ca, Sr, Co, Ba, Mg and their mixtures on a portion of the air electrode, and then (B) electrochemical vapor depositing a dense skeletal structure between and around the doped LaCrO[sub 3] particles. 2 figs.

Pal, U.B.; Isenberg, A.O.; Folser, G.R.

1992-01-14T23:59:59.000Z

417

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov (indexed) [DOE]

SOUTHERN CALIFORNIA EDISON® SOUTHERN CALIFORNIA EDISON® SM 1 Federal Utility Partnership Working Group Providence, Rhode Island April 15, 2010 Renewable Generation and Interconnection to the Electrical Grid in Southern California Daniel Tunnicliff, P.E. Manager, Government & Institutions SOUTHERN CALIFORNIA EDISON® SM 2 Overview * SCE Overview * SCE Procurement Objectives * Renewable Procurement * Challenges to Meeting Renewable Goals in California * Interconnection Processes * Lessons Learned SOUTHERN CALIFORNIA EDISON® SM 3 SCE Overview * Large system  13 million residents  4.8 million customer accounts  50,000-square-mile service area * Nation's leader in environmental solutions  Energy efficiency  Renewable energy procurement  Electric transportation  Advanced meters  Smart grid

418

NSLS User Access | Requesting Beam Time  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Requesting Beam Time Requesting Beam Time Use one of the following options depending on your research: General User Proposal General User proposals are peer reviewed for scientific merit by a Proposal Review Panel (PRP). General User proposals compete for beamtime with other General User Proposals based on scientific merit. Once the original proposal and beam time request is reviewed and rated in the PASS System, additional beam time requests can be submitted against the original proposal for its lifetime, a period of up to six cycles (two years). Data taken during experiments associated with a General User proposal is considered to be in the public domain. There is no charge for General User beamtime. Rapid Access Rapid Access proposals are a subset of General User proposals available for

419

Furman University Cell Phone Allowance Request Form  

E-Print Network [OSTI]

Furman University Cell Phone Allowance Request Form Date Payment: $___________ All cell phone allowance payments are departmental responsibility and considered other compensation charged to object code ________. The cell phone allowance will start at the next

420

EERE FY 2015 Budget Request Webinar-- Transportation  

Office of Energy Efficiency and Renewable Energy (EERE)

EERE FY 2015 Budget Request Webinar, featuring Reuben Sarkar, Deputy Assistant Secretary for Transportation, Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy, as presented on Thursday, April 3, 2014.

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

BPA-2012-01483-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Organization: TFOY --- RETIRED Address: Phone: No FAX number provided Email: CE1VED BY BPA FOLA OFFICE THIS DATE: DUE DATE: I 7 Description of Request: emails sent & recieved...

422

BPA-2011-00443-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Description of Request: in 2009 I went through the application process to become a substation operator. i was interviewed and subsequently not selected. i plan to re apply next...

423

Machining and Technical Services Service Request Form  

E-Print Network [OSTI]

Machining and Technical Services Service Request Form Clemson University - College of Engineering $35 $60 $55 $90 $52.50 $82.50 Total Labor EDM Hours Outside Hours Outside EDM Hours Priority -

Duchowski, Andrew T.

424

Machining and Technical Services Service Request Form  

E-Print Network [OSTI]

Machining and Technical Services Service Request Form 2010-2011 Clemson University - College: Hours Price per hour Amount $35 $60 $55 $90 $52.50 $82.50 Total Labor EDM Hours Outside Hours Outside EDM Hours Priority -

Duchowski, Andrew T.

425

BPA-2012-01700-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

P.O. Box 3621 Portland, Oregon 97208 SUBJECT: FOIA Request Dear Ms. Winn: RECEIVED BY BPA IOtA OFFICE TillS DATE: f, j DUE DATE: LOG Pursuant to the Freedom of Information...

426

BPA-2001-00401-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sent: Wednesday, December 22, 2010 1:47 PM To: Atterbury,Laura M - DK-7 Subject: Fwd: BPA FOIA request --- Forwarded message --- From: Date:...

427

BPA-2012-003364-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dec.2011 Memo To:W.C.Madsen,Wildlife Mgr.BPA Subject:Freedom of Information Act Request(FOIA) From:Rob Kavanaugh Lt42' Thanks for your response and letter dated Oct.31.2011 ref the...

428

BPA-2012-01311-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

writing on behalf of PTu to lodge a request with the Bonneville Power Administration (BPA), pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 552, and implementing...

429

BPA-2012-01784-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Zornes Organization: none Address: Phone: No FAX number provided Email: RECEIVED BY BPA FO A OFFICE TIM DATE: DUE DATE: V. LOGE Description of Request: I am making this...

430

BPA-2011-00300-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Atterbury,Laura M - DK-7 From: on behalf of FOIA Subject: FW: FOIA Request From: ben.johnson@btjd.com mailto:ben.johnson@btjd.com) Sent: Monday, November 22, 2010 1:20 PM To:...

431

BPA-2012-01869-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OFF WE THIS DATE: oj DUE DATE: Ib)q Ji;i LOG 2O- Di1P Description of Request: Hello, I would like to know how many GS9 or above archaeologists (0193) work for you agency....

432

BPA-2011-01515-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BP FOA OFF E TUS DATE: 'f o?S a7 DUE DA E LOG Description of Request: Any and all records related in any way to Mud Lake andor Circle C Rock Products located at NW 334th...

433

BPA-2012-01880-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

No FAX number provided Email: jshwartz@uoregon.edu Description of Request: I seek all records associated with "RTO West" and "Grid West." I am only interested in records from the...

434

BPA-2011-00930-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

No FAX number provided Email: I: Ot; S Description of Request: I live adjacent to a PBA transmission line right of way and you have an easement on my property. On 4-6, I beleive...

435

BPA-2011-00987-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Request: I would like the dates of all the times the Castle Rock - Lexington line have been cleared or trimmed by BPA brushtree trimming crews for the past 20 years....

436

BPA-2012-00507 FOIA request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in the process of updating its information related to the investment of the 500 kv transmission line systems in Montana. Pursuant to the Freedom of Information Act, we request the...

437

WA_00_025_PRAXAIR_INC_Waiver_Request.pdf | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

25PRAXAIRINCWaiverRequest.pdf WA00025PRAXAIRINCWaiverRequest.pdf WA00025PRAXAIRINCWaiverRequest.pdf More Documents & Publications WA00001PRAXAIRINCWaiverofDo...

438

Long-Distance Interconnection as Solar Resource Intermittency Solution: Optimizing the Use of Energy Storage and the Geographic  

E-Print Network [OSTI]

of Energy Storage and the Geographic Dispersion + Interconnection of Solar Generating Facilities. Marc J. R energy targets. Variability of the solar resource occurs across many different temporal scales: from energy storage and Long-distance interconnection coupled with geographic dispersion of solar generating

439

Three-Dimensional Analysis of Solid Oxide Fuel Cell Ni-YSZ Anode Interconnectivity James R. Wilson,a  

E-Print Network [OSTI]

1 Three-Dimensional Analysis of Solid Oxide Fuel Cell Ni-YSZ Anode Interconnectivity James R of interconnectivity of solid-oxide fuel cell (SOFC) electrode phases. The method was applied to the three, and hence was not electrochemically active. #12;2 1. Introduction Attempts to understand solid oxide fuel

Kalies, William D.

440

A Guidebook on Grid Interconnection and Islanded Operation of Mini-Grid Power Systems Up to 200 kW  

E-Print Network [OSTI]

Nehru National Solar Mission: Phase II Policy Document. Solar Friendly Communities Permitting, Interconnection, and Net Metering: An Overview of Model Standards and PolicySolar ABCs) funded by the USA Department of Energy, pushes for reform and national standardization on interconnection policy.

Greacen, Chris

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

OIL: a nano-photonics optical interconnect library for a new photonic networks-on-chip architecture  

Science Journals Connector (OSTI)

In this paper, we present OIL, a parameterized Optical Interconnect Library of silicon nano-photonic devices for system level interconnect planning/analysis and low power high performance design exploration under a new holistic photonic Networks-on-Chip ... Keywords: computer aided design, high performance, low power, photonic networks-on-chip

Duo Ding; David Z. Pan

2009-07-01T23:59:59.000Z

442

ARM - Engineering Change Request & Engineering Change Order Guidelines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Change Request & Change Request & Engineering Change Order Guidelines Page Contents: Guideline for Starting a Request for a New ARM Product, Capability, or Functionality Engineering Task Tracking Tool Tracking Capabilities Getting Closure, the Baseline Change Request Glossary Engineering Change Request & Engineering Change Order Guidelines Requesting Engineered Products and Services in ARM Guideline for Starting a Request for a New ARM Product, Capability, or Functionality The purpose of this guideline is to establish a method that members of the ARM Infrastructure team may use to submit requests for products and services from the ARM Engineering Group. The concept of "new product, capability, or functionality" refers to the idea that requests the ARM Infrastructure Team to make to the Engineering Group that will ultimately

443

REQUEST FOR RECORDS DISPOSITION AUTHORITY  

Broader source: Energy.gov (indexed) [DOE]

~nstructions on reverse) ~nstructions on reverse) G E N E R A L SERVICES A D M I N I S T R A T I O N N A T I O N A L ARCHIVES A N D RECORDS SERVICE, WASHINGTON, D C 20408 1. F R O M (Agency or ertablishment) L E A V E B L A N K JOB NO. di-%3%-fF / C D A T E R E C E I V E D flzg)~? NOTIFICATION TO AGENCY n t n f F n e r a v - Sari Francisco Operations Office . 3. M I N O R S U B D I V I S I O N b ~ s ~ ~ 5 ? % 5 2 5 Lawrence Berkel ey Laboratory 4. N A M E O F PERSON W I T H W H O M T O CONFER IS. TELEPHONE EXT. I hereby certify that I am authorized to act for this agency in matters pertaining to the disposal of the agency's records; that the records proposed for disposal in this Request of 1 page(s) are not now needed for the business of this agency or will not be needed after the retention periods specified; and that written concurrence from the General Accounting Office, if required under the provisions of Title 8 of the GAO Manual for Guidance of Federal Agencies, is

444

REQUEST FOR RECORDS DISPOSITION AUTHORITY  

Broader source: Energy.gov (indexed) [DOE]

Instructions on reverse) Instructions on reverse) LEAVE BLANK - GENERAL SERVICES ADMINISTRATION NATIONAL ARCHIVES AND RECORDS SERVICE, WASHINGTON, DC 20408 I . F R O M (Agency or ertabluhmentJ D A T E RECEIVED NOTIF~CATION TO AGENCY Department of Energy 2. MAJ0.R S U B D I V I S I O N I 4 . N A M E O F PERSON W I T H W H O M T O CONFER 15. TELEPHONE E X T . \OATS l A R C H l V l S T O F T H E U N I T E D STATES In accordance with the provisions of 44 U.S.C. 3303 the dispoal request. including amendmentr, is approved . 3. M I N O R S U B D I V I S I O N except for items that may be marked "disposition not approved" or "withdrawn" in column 10. If no records are proposed for disposal, the signature of the Archivist is not required. I hereby certify that I am authorized to act for this agency in matters pertaining to the disposal of the agency's records;

445

2013 Reinvention Fund Request for Proposals 1 2013 Reinvention Fund: Request for Proposals  

E-Print Network [OSTI]

2013 Reinvention Fund Request for Proposals 1 2013 Reinvention Fund: Request for Proposals Building a Living Laboratory for Sustainability at Penn State Reinvention Fund Projects Pre-Proposals Due: October 21, 2013 Full Proposals Due: December 20, 2013 Student Sustainability Innovation Projects Pre

Maranas, Costas

446

Effect of Via Separationand Low-k Dielectric Materials on the Thermal Characteristics of Cu Interconnects  

E-Print Network [OSTI]

Effect of Via Separationand Low-k Dielectric Materials on the Thermal Characteristics of Cu in low-k based interconnect structures by providing lower thermal resistance paths. In this paper that the temperature is highly dependent on the via separation. A 3-D electro-thermal simulation methodology using

447

Compact quasi-analytic equations for estimating the temperature distribution of ULSI interconnections  

Science Journals Connector (OSTI)

With the wide application of low dielectric constant materials in ULSI circuits, the problem of heat dissipation becomes more critical due to the small thermal conductivity of such materials. Compact quasi-analytic equations for estimating the temperature ... Keywords: ULSI circuits, interconnection, thermal behavior simulation

X. Xiao; X. You; G. Ruan

2002-04-01T23:59:59.000Z

448

Modeling and Simulation Environment for Photonic Interconnection Networks in High Performance Computing  

E-Print Network [OSTI]

at the scale of high performance computer clusters and warehouse scale data centers, system level simulations and results for rack scale photonic interconnection networks for high performance computing. Keywords: optical to the newsworthy power consumption [3], latency [4] and bandwidth challenges [5] of high performance computing (HPC

Bergman, Keren

449

THE ANALYSYS OF INFORMATION IMPACTS IN COORDINATING DEFENCE AGAINST MALICIOUS ATTACKS FOR INTERCONNECTED  

E-Print Network [OSTI]

and the physical behaviors of power systems. Secondly, system operators are assumed able to perform certain-ordination of Transmission of Electricity) operation handbook [6]. Meanwhile, multi-agent systems (MAS) have been widely FOR INTERCONNECTED POWER SYSTEMS Ettore Bompard George Gross Roberto Napoli Fei Xue Politecnico di Torino University

Gross, George

450

Optimization of Interconnects Between Accelerators and Shared Memories in Dark Silicon Jason Cong and Bingjun Xiao  

E-Print Network [OSTI]

Optimization of Interconnects Between Accelerators and Shared Memories in Dark Silicon Jason Cong, 90095 {cong, xiao}@cs.ucla.edu Abstract--Application-specific accelerators provide orders-of- magnitude improvement in energy-efficiency over CPUs, and accelerator-rich computing platforms are showing promise

Cong, Jason "Jingsheng"

451

Optimization and Visualization of the North American Eastern Interconnect Power Market  

E-Print Network [OSTI]

. Hale DHALE@eia.doe.gov U.S. Energy Information Agency Washington, DC 20585 USA Thomas J. OverbyeOptimization and Visualization of the North American Eastern Interconnect Power Market Douglas R Overbye@ece.uiuc.edu University of Illinois at Urbana-Champaign Urbana, IL 61801 USA Abstract This paper

452

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or  

E-Print Network [OSTI]

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or system Electricity and Gas: A system used to distribute electricity and gas around the world/certain area, by compromising to minimise costs and generate the most electricity and gas as possible, which maximises profits

Wright, Francis

453

Graphene based nanomaterials for VLSI interconnect and energy-storage applications  

Science Journals Connector (OSTI)

As IC feature sizes continue to be scaled below 45 nanometer, copper wires exhibit significant "size effects" resulting in a sharp rise in their resistivity, which, in turn, has adverse impact both on their performance as well as reliability--in the ... Keywords: carbon nanomaterials, carbon nanotubes, graphene nano-ribbons, interconnects, passives.

Kaustav Banerjee

2009-07-01T23:59:59.000Z

454

Selection and Evaluation of Heat-Resistant Alloys for Planar SOFC Interconnect Applications  

SciTech Connect (OSTI)

Over the past several years, the steady reduction in SOFC operating temperatures to the intermediate range of 700~850oC [1] has made it feasible for lanthanum chromite to be supplanted by metals or alloys as the interconnect materials. Compared to doped lanthanum chromite, metals or alloys offer significantly lower raw material and fabrication costs. However, to be a durable and reliable, a metal or alloy has to satisfy several functional requirements specific to the interconnect under SOFC operating conditions. Specifically, the interconnect metal or alloy should possess the following properties: (i) Good surface stability (resistance to oxidation, hot corrosion, and carburization) in both cathodic (air) and anodic (fuel) atmospheres; (ii) Thermal expansion matching to the ceramic PEN (positive cathode-electrolyte-negative anode) and seal materials (as least for a rigid seal design); (iii) High electrical conductivity through both the bulk material and in-situ formed oxide scales; (iv) Bulk and interfacial thermal mechanical reliability and durability at the operating temperature; (v) Compatibility with other materials in contact with interconnects such as seals and electrical contact materials.

Yang, Z Gary; Weil, K. Scott; Paxton, Dean M.; Stevenson, Jeffry W.

2002-11-21T23:59:59.000Z

455

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration is preparing an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near ONeill, Nebraska, to Westerns power transmission system. The project website is http://www.wapa.gov/ugp/Environment/GrandePrairie.htm.

456

Ionized physical vapor deposition of integrated circuit interconnects* J. Hopwood,a)  

E-Print Network [OSTI]

alloy silicide gate level and several metal-SiO2 interlayer dielectric ILD levels joined together metal layers. By the year 2007 it is predicted that logic circuits will use 6 to 7 interconnected metal physical vapor deposition I-PVD . The technique economically creates a unidirectional flux of metal which

457

Synthesis of electrical networks interconnecting PZT actuators to damp mechanical vibrations  

E-Print Network [OSTI]

This paper proves that it is possible to damp mechanical vibrations of some beam frames by means of piezoelectric actuators interconnected via passive networks. We create a kind of electromechanical wave guide where the electrical velocity group equals the mechanical one thus enabling an electromechanical energy transfer. Numerical simulations are presented which prove the technical feasibility of proposed device

F. dell'Isola; E. G. Henneke; M. Porfiri

2010-08-30T23:59:59.000Z

458

Optically Interconnected Data Center Architecture for Bandwidth Intensive Energy Efficient Networking  

E-Print Network [OSTI]

Optically Interconnected Data Center Architecture for Bandwidth Intensive Energy Efficient) 854 2900, e-mail: howard@ee.columbia.edu ABSTRACT The relentless rise of data-intensive cloud will either be prohibitively costly, overly complex, or result in unsustainable energy requirements. Network

Bergman, Keren

459

ELECTRIFICATION OF ISOLATED AREAS BY INTERCONNECTING DIFFERENT RENEWABLE SOURCES OF ENERGY: A SUSTANAIBLE APPROACH  

E-Print Network [OSTI]

of a methodology for rural electrification by micro-grids based upon different renewable resources. > ApplicationELECTRIFICATION OF ISOLATED AREAS BY INTERCONNECTING DIFFERENT RENEWABLE SOURCES OF ENERGY to absorb innovations such as rural electrification by isolated micro grid Sustainable approach The success

460

Transient Analysis of a CMOS Inverter Driving Resistive Interconnect Kevin T. Tang and Eby G. Friedman  

E-Print Network [OSTI]

are characterized by the th power law model. In order to emphasize the nonlinear behavior of a CMOS inverterTransient Analysis of a CMOS Inverter Driving Resistive Interconnect Kevin T. Tang and Eby G. Friedman Department of Electrical and Computer Engineering University of Rochester Rochester, New York

Friedman, Eby G.

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

A Self-Reconfigurable Lightweight Interconnect for Scalable Processor Fabrics Heiner Giefers and Marco Platzner  

E-Print Network [OSTI]

, energy, and execution time. Therefore it is of high interest to also study alternative interconnects compile-time informa- tion and reconfigures the global network due to program demands. We consider data of the switch's ports. Communication within a sub-bus is established by broadcasting to the bus segment

Hellebrand, Sybille

462

Application Of Ti-Based Self-Formation Barrier Layers To Cu Dual-Damascene Interconnects  

SciTech Connect (OSTI)

Cu interconnects have been used extensively in ULSI devices. However, large resistance-capacitance delay and poor device reliability have been critical issues as the device feature size has reduced to nanometer scale. In order to achieve low resistance and high reliability of Cu interconnects, we have applied a thin Ti-based self-formed barrier (SFB) using Cu(Ti) alloy seed to 45nm-node dual damascene interconnects and evaluated its performance. The line resistance and via resistance decreased significantly, compared with those of conventional Ta/TaN barriers. The stress migration performance was also drastically improved using the SFB process. A performance of time dependent dielectric breakdown revealed superior endurance. These results suggest that the Ti-based SFB process is one of the most promising candidates for advanced Cu interconnects. TEM and X-ray photoelectron spectroscopy observations for characterization of the Ti-based SFB structure were also performed. The Ti-based SFB consisted of mainly amorphous Ti oxides. Amorphous or crystalline Ti compounds such as TiC, TiN, and TiSi formed beneath Cu alloy films, and the formation varied with dielectric.

Ito, Kazuhiro; Kohama, Kazuyuki [Department of Materials Science and Engineering, Kyoto University, Kyoto 606-8501 (Japan); Ohmori, Kazuyuki; Mori, Kenichi; Maekawa, Kazuyoshi; Asai, Koyu [Process Technology Div., Renesas Electronics Corporation, Hitachinaka, Ibaraki 312-8504 (Japan); Murakami, Masanori [The Ritsumeikan Trust, Nakagyo-ku, Kyoto 604-8520 (Japan)

2010-11-24T23:59:59.000Z

463

HVDC Control Strategies to Improve Transient Stability in Interconnected Power Systems  

E-Print Network [OSTI]

HVDC Control Strategies to Improve Transient Stability in Interconnected Power Systems J. Hazra Dpt of Li`ege, Belgium, dernst@ulg.ac.be Abstract--This paper presents three HVDC modulation strate- gies flow settings through the HVDC-links. The proposed techniques are tested on the IEEE 24-Bus reliability

Boyer, Edmond

464

Phase 1 - Evaluation of a Functional Interconnect System for Solid Oxide Fuel Cells  

SciTech Connect (OSTI)

This project is focused on evaluating the suitability of materials and complex multi-materials systems for use as solid oxide fuel cell interconnects. ATI Allegheny Ludlum has generated promising results for interconnect materials which incorporate modified surfaces. Methods for producing these surfaces include cladding, which permits the use of novel materials, and modifications via unique thermomechanical processing, which allows for the modification of materials chemistry. The University of Pittsburgh is assisting in this effort by providing use of their in-place facilities for dual atmosphere testing and ASR measurements, along with substantial work to characterize post-exposure specimens. Carnegie Mellon is testing interconnects for chromia scale spallation resistance using macro-scale and nano-scale indentation tests. Chromia spallation can increase electrical resistance to unacceptable levels and interconnect systems must be developed that will not experience spallation within 40,000 hours at operating temperatures. Spallation is one of three interconnect failure mechanisms, the others being excessive growth of the chromia scale (increasing electrical resistance) and scale evaporation (which can poison the cathode). The goal of indentation fracture testing at Carnegie Mellon is to accelerate the evaluation of new interconnect systems (by inducing spalls at after short exposure times) and to use fracture mechanics to understand mechanisms leading to premature interconnect failure by spallation. Tests include bare alloys from ATI and coated systems from DOE Laboratories and industrial partners, using ATI alloy substrates. West Virginia University is working towards developing a cost-effective material for use as a contact material in the cathode chamber of the SOFC. Currently materials such as platinum are well suited for this purpose, but are cost-prohibitive. For the solid-oxide fuel cell to become a commercial reality it is imperative that lower cost components be developed. Based on the results obtained to date, it appears that sterling silver could be an inexpensive, dependable candidate for use as a contacting material in the cathode chamber of the solid-oxide fuel cell. Although data regarding pure silver samples show a lower rate of thickness reduction, the much lower cost of sterling silver makes it an attractive alternative for use in SOFC operation.

James M. Rakowski

2006-09-30T23:59:59.000Z

465

FY 2014 Budget Request Now Available | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FY 2014 Budget Request Now Available FY 2014 Budget Request Now Available FY 2014 Budget Request Now Available April 10, 2013 - 5:20pm Addthis The Office of Electricity Delivery and Energy Reliability's (OE) FY 2014 budget request represents an increased investment in the continued commitment to help keep America's energy flowing, promote economic prosperity, and move the nation closer to a cleaner and more secure energy future. Highlights of OE's FY2014 budget request, and Assistant Secretary Patricia Hoffman's presentation on the budget request are also available online. For more information, click here. The entire FY 2014 budget request for the Department of Energy is also available online. For highlights of the Department's FY 2014 budget request, read the press release. Addthis Related Articles

466

Request for Proposals in Organic & Sustainability Systems Research, Teaching & Outreach  

E-Print Network [OSTI]

Request for Proposals in Organic & Sustainability Systems Research, Teaching & Outreach Proposal at Cornell's College of Agriculture and Life Sciences (CALS) requests proposals for innovative research, teaching and extension/outreach projects involving organics and sustainability in farm and food systems

Pawlowski, Wojtek

467

Recommendation 178: FY 2011 DOE Oak Ridge EM Budget Request ...  

Office of Environmental Management (EM)

78: FY 2011 DOE Oak Ridge EM Budget Request Recommendation 178: FY 2011 DOE Oak Ridge EM Budget Request At our April 8, 2009, meeting, the Oak Ridge Site Specific Advisory Board...

468

Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request...  

Office of Environmental Management (EM)

9 : FY 2014 DOE Oak Ridge EM Budget Request Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request At the April 11, 2012, meeting, the Oak Ridge Site Specific Advisory Board...

469

Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request ...  

Office of Environmental Management (EM)

6: FY 2015 DOE Oak Ridge EM Budget Request Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request At the May 8, 2013, meeting, the Oak Ridge Site Specific Advisory Board...

470

Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request ...  

Office of Environmental Management (EM)

7: FY 2013 DOE Oak Ridge EM Budget Request Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request At the May 26, 2011, meeting, the Oak Ridge Site Specific Advisory Board...

471

REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy  

Office of Environmental Management (EM)

U. S. Atomic Energy Commision REQUEST FOR RECORDS DISPOSITION AUTHORITY More Documents & Publications REQUEST FOR RECORDS DISPOSITION AUTHORITY DOE-HDBK-1109-97 DOE-HDBK-1109-97...

472

Highlights of the FY 2011 Congressional Budget Request for OE...  

Office of Environmental Management (EM)

Highlights of the FY 2011 Congressional Budget Request for OE The FY 2011 Office of Electricity Delivery and Energy Reliability (OE) budget request is 185.9 million, 14.0...

473

Alternative Fuels Data Center: Request to Report Research on Second  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Request to Report Request to Report Research on Second Generation Biofuels to someone by E-mail Share Alternative Fuels Data Center: Request to Report Research on Second Generation Biofuels on Facebook Tweet about Alternative Fuels Data Center: Request to Report Research on Second Generation Biofuels on Twitter Bookmark Alternative Fuels Data Center: Request to Report Research on Second Generation Biofuels on Google Bookmark Alternative Fuels Data Center: Request to Report Research on Second Generation Biofuels on Delicious Rank Alternative Fuels Data Center: Request to Report Research on Second Generation Biofuels on Digg Find More places to share Alternative Fuels Data Center: Request to Report Research on Second Generation Biofuels on AddThis.com... More in this section...

474

POCs for Emergency Requests of Oil from the SPR | Department...  

Energy Savers [EERE]

POCs for Emergency Requests of Oil from the SPR POCs for Emergency Requests of Oil from the SPR SPR personnel are available to answer any questions you might have. Please contact...

475

Requesting A Token | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A Token A Token Requesting A Token Step One - Registering with MIS To request a DOE Two-Factor Authentication Token you must first register in DOE's Management Information System (MIS) by going to https://mis.doe.gov/, selecting "Requesting Access" and following the onscreen instructions. Note: DOE Federal employees are already registered and do not need to complete this step, they may skip to step 2 During the registration process you will be required to search for, and select, a DOE sponsor. Your DOE sponsor is the DOE federal employee that is certifying that you have a recognized relationship with the Department and have a valid need for a DOE Two-Factor Authentication Token. For contractors this person is often your Contract Task Manager, Contracting

476

I REQUEST FOR RECORDS DISPOSITION AUTHORITY  

Broader source: Energy.gov (indexed) [DOE]

REQUEST FOR RECORDS DISPOSITION AUTHORITY REQUEST FOR RECORDS DISPOSITION AUTHORITY LEAVE BL ...A (NARA use only1 JOB NUMBER TO: NATIONAL ARCHIVES & RECORDS ADMINISTRATION In accordance with the provisions of 44 U.S.C. 3303a, the Office of the Chief Information Officer disposition request, including amendments, is approved except for items that may be marked "disposition not approved" or "withdrawn" in column 10. Records Management Division N1-434-02-2 Date received 860 1 ADELPHI ROAD COLLEGE PARK, MD 20740-600 1 1. FROM (Agency or establishment) Department of Energy , ( / I 4 30 -A&&& NOTIFICATION TO AGENCY 6. AGENCY CERTIFICATION I hereby certify that I am authorized to act for this agency in matters pertaining to the disposition of its records and that the

477

SDSU RESEARCH FOUNDATION FELLOWSHIP/SCHOLARSHIP DISBURSEMENT REQUEST  

E-Print Network [OSTI]

AND RESIDENT ALIENS. DO NOT USE THIS FORM FOR PAYMENTS TO NONRESIDENT ALIENS. Date of Request: From: Period

Ponce, V. Miguel

478

BIA Request for Proposals for Climate Adaptation Grants for Tribes  

Broader source: Energy.gov [DOE]

Download the Bureau of Indian Affairs Request for Proposals for Climate Adaptation Grants for Tribes, due November 29.

479

FOIA Frequently Requested Documents: DE-EE0002884 Sapphire Energy  

Office of Energy Efficiency and Renewable Energy (EERE)

FOIA Frequently Requested Documents: DE-EE0002884 Sapphire Energy, GO-12-043 Redacted Sapphire FOIA.

480

Request for Information on Photovoltaic Module Recycling  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy SunShot Initiative requests feedback from industry, academia, research laboratories, government agencies, and other stakeholders on issues related to photovoltaic (PV) module recycling technology. SunShot intends to understand the current state of recycling technology and the areas of research that could lead to impactful recycling technologies to support the developing PV industry. The intent of this request for information is to generate discussion related to planning for the end of life of photovoltaic modules and to create a list of high impact research topics in photovoltaics recycling.

Note: This page contains sample records for the topic "interconnection request cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Broader source: Energy.gov (indexed) [DOE]

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

482

REQUEST FOR BRIDGE FUNDING Schools of the Health Sciences  

E-Print Network [OSTI]

1 REQUEST FOR BRIDGE FUNDING Schools of the Health Sciences (Revised, November 2013) In light Sciences and Dean, School of Medicine, will provide bridge funding as permitted by the merit of the request for such funds and funds available. A committee has been established to review the requests for bridge funding

Jiang, Huiqiang

483

REQUEST FOR BRIDGE FUNDING Schools of the Health Sciences  

E-Print Network [OSTI]

1 REQUEST FOR BRIDGE FUNDING Schools of the Health Sciences (Revised, August 2013*) In light Sciences and Dean, School of Medicine, will provide bridge funding as permitted by the merit of the request for such funds and funds available. A committee has been established to review the requests for bridge funding

Benos, Takis

484

College of Engineering Request for Institutional Waiver of Indirect Cost  

E-Print Network [OSTI]

PAF Number College of Engineering Request for Institutional Waiver of Indirect Cost Principal Investigator Sponsor Project Title Total Direct Costs Total Modified Direct Costs Full Indirect Costs Rate Full Indirect Costs Amount Total Project Costs (with Full IDC) Requested Indirect Costs Rate Requested Indirect

Kamat, Vineet R.

485

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

486

The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Relevance of Generation The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland Subcontract Report NREL/SR-6A20-48987 October 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland

487

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

488

Making Connections: Case Studies of Interconnection Barriers and their Impact on Distributed Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Interconnection of Interconnection Barriers and their Impact on Distributed Power Projects M a k i n g M a k i n g Connections Connections NREL/SR-200-28053 Revised July 2000 United States Department Of Energy Distributed Power Program Office of Energy Efficiency and Renewable Energy, Office of Power Technologies Joseph Galdo DOE Distributed Power Program Manager Office of Power Technologies, EE-15 U.S. Department of Energy Forrestal Building, 5H-021 1000 Independence Avenue SW Washington, DC 20585 Phone: (202) 586-0518 Fax: (202) 586-1640 Richard DeBlasio NREL Distributed Power Program Manager National Renewable Energy Laboratory 1617 Cole Blvd. (MS 3214) Golden, CO 80601 Phone: (303) 384-6452 Fax: (303) 384-6490 Gary Nakarado* National Renewable Energy Laboratory NREL Distributed Power Program Technical Monitor

489

The Development of Interconnection Standards in Six States In 2007-2008  

SciTech Connect (OSTI)

This paper discusses the process of developing standards for the interconnection of photovoltaic systems and other generators under ten megawatts to the electric grid. State utility commission rulemakings in 2007-2008 in Florida, New Mexico, North Carolina, Maryland, Illinois and Utah provide the basis for analysis of what is and should be considered in the development of standards, and how the process can be improved. State interconnection standards vary substantially, and many utilities have discretion to establish additional or different requirements, creating literally hundreds of sets of rules. This lack of uniformity imposes a significant cost on project developers and installers to track and comply with applicable rules. As well, burdensome provisions and uncertain costs and timelines present formidable barriers to entry, which advocates have limited resources to challenge. For a better process, the author proposes: establishing federal standards as a baseline, involving solar advocates, and developing a utility cost-recovery mechanism.

Keyes, Jason B.

2008-04-01T23:59:59.000Z

490

A novel design for monolithic interconnected modules (MIMs) for thermophotovoltaic (TPV) power conversion  

SciTech Connect (OSTI)

The design for the fabrication of Monolithic Interconnected Modules (MIMs) for thermophotovoltaic (TPV) power conversion described in this paper utilizes a novel, interdigitated contacting scheme that increases the flexibility in the size of the component cells and hence the output current and voltage of the module. This flexibility is gained at the expense of only minimally increased grid obscuration. Because the design uses the grid fingers of the component cells as the interconnect structure, the area of the device used for this purpose becomes negligible. In this paper the authors report on the specifics of the design as well as issues related to the fabrication of the modules. Preliminary performance data for representative modules also are offered.

Ward, J.S.; Duda, A.; Wanlass, M.W. [National Renewable Energy Lab., Golden, CO (United States)] [and others

1997-06-01T23:59:59.000Z

491

Bipolar plating of metal contacts onto oxide interconnection for solid oxide electrochemical cell  

DOE Patents [OSTI]

Disclosed is a method of forming an adherent metal deposit on a conducting layer of a tube sealed at one end. The tube is immersed with the sealed end down into an aqueous solution containing ions of the metal to be deposited. An ionically conducting aqueous fluid is placed inside the tube and a direct current is passed from a cathode inside the tube to an anode outside the tube. Also disclosed is a multi-layered solid oxide fuel cell tube which consists of an inner porous ceramic support tube, a porous air electrode covering the support tube, a non-porous electrolyte covering a portion of the air electrode, a non-porous conducting interconnection covering the remaining portion of the electrode, and a metal deposit on the interconnection.

Isenberg, Arnold O. (Forest Hills Boro, PA)

1987-01-01T23:59:59.000Z

492

Viscosity Solutions of Systems of PDEs with Interconnected Obstacles and Switching Problem  

SciTech Connect (OSTI)

This paper deals with existence and uniqueness of a solution in viscosity sense, for a system of m variational partial differential inequalities with inter-connected obstacles. A particular case is the Hamilton-Jacobi-Bellmann system of the Markovian stochastic optimal m-states switching problem. The switching cost functions depend on (t,x). The main tool is the notion of systems of reflected backward stochastic differential equations with oblique reflection.

Hamadene, S., E-mail: hamadene@univ-lemans.fr; Morlais, M. A., E-mail: Marie_Amelie.Morlais@univ-lemans.fr [Universite du Maine, LMM (France)

2013-04-15T23:59:59.000Z

493

Optimal control locations for a class of large interconnected dynamic systems  

E-Print Network [OSTI]

system, a stability crisis usually arises when a fault occurs at one or more major transmission lines. After such a fault, the system suddenly possesses an excess of unevenly distributed kinetic energy. If no action is taken, this energy excess could... cause the phase angles of the generators to swing wildly and thus overload and eventually trip breakers on some interconnecting transmission lines. An open breaker essentially deletes a line from the system, which in turn triggers the possible...

Antonio, John Kirby

2012-06-07T23:59:59.000Z

494

Performance optimization of interconnections for ultra-high-speed digital circuits  

E-Print Network [OSTI]

as distributed transmission line systems. Criteria for the design are outlined and studied. The findings of these studies are then applied to requirements for optimal design of interconnection schemes at various levels of high-speed digital system packaging... . V 40 A. Conductor Bends . . . . . . . . . . . . . . . . 42 B. Impedance Step/Mismatched Transmission Line Element 46 C. Fan-out/Fan-in Signal Distribution Networks D. Conclusions for Discontinuity Behaviors 55 71 V COUPLED LINE BEHAVIORS...

Carey, David Harrison

2012-06-07T23:59:59.000Z

495

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection  

SciTech Connect (OSTI)

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

2013-03-01T23:59:59.000Z

496

Corrosion and Protection of Metallic Interconnects in Solid Oxide Fuel Cells  

SciTech Connect (OSTI)

Energy security and increased concern over environmental protection have spurred a dramatic world-wide growth in research and development of fuel cells, which electrochemically convert incoming fuel into electricity with no or low pollution. Fuel cell technology has become increasingly attractive to a number of sectors, including utility, automotive, and defense industries. Among the various types of fuel cells, solid oxide fuel cells (SOFCs) operate at high temperature (typically 650-1,000 C) and have advantages in terms of high conversion efficiency and the flexibility of using hydrocarbon fuels, in addition to hydrogen. The high temperature operation, however, can lead to increased mass transport and interactions between the surrounding environment and components that are required to be stable during a lifetime of thousands of hours and up to hundreds of thermal cycles. For stacks with relatively low operating temperatures (<800 C), the interconnects that are used to electrically connect a number of cells in series are typically made from cost-effective metals or alloys. The metallic interconnects must demonstrate excellent stability in a very challenging environment during SOFC operation, as they are simultaneously exposed to both an oxidizing (air) environment on the cathode side and a reducing environment (hydrogen or a reformed hydrocarbon fuel) on the anode side. Other challenges include the fact that water vapor is likely to be present in both of these environments, and the fuel is likely to contain impurities, such as sulfides. Since the fuel is usually a reformed hydrocarbon fuel, such as natural gas, coal gas, biogas, gasoline, etc., the interconnect is exposed to a wet carbonaceous environment at the anode side. Finally, the interconnect must be stable towards any adjacent components, such as electrodes, seals and electrical contact materials, with which it is in physical contact.

Yang, Z Gary; Stevenson, Jeffry W.; Singh, Prabhakar

2007-12-09T23:59:59.000Z

497

Oxidation Resistant, Cr Retaining, Electrically Conductive Coatings on Metallic Alloys for SOFC Interconnects  

SciTech Connect (OSTI)

This report describes significant results from an on-going, collaborative effort to enable the use of inexpensive metallic alloys as interconnects in planar solid oxide fuel cells (SOFCs) through the use of advanced coating technologies. Arcomac Surface Engineering, LLC, under the leadership of Dr. Vladimir Gorokhovsky, is investigating filtered-arc and filtered-arc plasma-assisted hybrid coating deposition technologies to promote oxidation resistance, eliminate Cr volatility, and stabilize the electrical conductivity of both standard and specialty steel alloys of interest for SOFC metallic interconnect (IC) applications. Arcomac has successfully developed technologies and processes to deposit coatings with excellent adhesion, which have demonstrated a substantial increase in high temperature oxidation resistance, stabilization of low Area Specific Resistance values and significantly decrease Cr volatility. An extensive matrix of deposition processes, coating compositions and architectures was evaluated. Technical performance of coated and uncoated sample coupons during exposures to SOFC interconnect-relevant conditions is discussed, and promising future directions are considered. Cost analyses have been prepared based on assessment of plasma processing parameters, which demonstrate the feasibility of the proposed surface engineering process for SOFC metallic IC applications.

Vladimir Gorokhovsky

2008-03-31T23:59:59.000Z

498

Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.  

SciTech Connect (OSTI)

Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

2012-02-01T23:59:59.000Z

499

Effect of interconnect creep on long-term performance of SOFC of one cell stacks  

SciTech Connect (OSTI)

Creep deformation becomes relevant for a material when the operating temperature is near or exceeds half of its melting temperature (in degrees of Kelvin). The operating temperatures for most of the solid oxide fuel cells (SOFC) under development in the SECA program are around 1073oK. High temperature ferritic alloys are potential candidates as interconnect (IC) materials and spacers due to their low cost and CTE compatibility with other SOFC components. Since the melting temperature of most stainless steel is around 1800oK, possible creep deformation of IC under the typical cell operating temperature should not be neglected. In this paper, the effects of interconnect creep behavior on stack geometry change and stress redistribution of different cell components are predicted and summarized. The goal of the study is to investigate the performance of the fuel cell stack by obtaining the fuel and air channel geometry changes due to creep of the ferritic stainless steel interconnect, therefore indicating possible SOFC performance change under long term operations. IC creep models were incorporated into SOFC-MP and Mentat FC, and finite element analyses were performed to quantify the deformed configuration of the SOFC stack under the long term steady state operating temperature. It is found that creep behavior of the ferritic stainless steel IC contributes to narrowing of both the fuel and the air flow channels. In addition, stress re-distribution of the cell components suggests the need for a compliant sealing material that also relaxes at operating temperature.

Liu, Wenning N.; Sun, Xin; Khaleel, Mohammad A.

2008-02-01T23:59:59.000Z

500

Life Prediction of Coated and Uncoated Metallic Interconnect for Solid Oxide Fuel Cell Applications  

SciTech Connect (OSTI)

Oxidation reaction of the ferritic stainless interconnects in a typical SOFC working environment is unavoidable and the thickness of the oxide scale will continue to grow with operating time, even with protective coatings. The interfacial strength of the various interfaces for the uncoated and coated ferritic interconnects is crucial to long term performance of SOFCs. In this paper, we employ an integrated experimental/modeling approach to quantify the interfacial strength and to further predict the life of Crofer 22 APU as SOFC interconnect under isothermal cooling condition. The life of Crofer 22 APU was predicted by comparing the predicted interfacial strength, interfacial stresses induced by the cooling process from the operating temperature to room temperature, together with the growth kinetics of oxide scale with and without spinel coating. It was found that the interfacial strength between the oxide scale and Crofer 22 APU substrate decreases with the growth of the oxide scale. The interfacial strength of the oxide scale and spinel coating is much higher than that of the oxide scale and Crofer 22 APU substrate. With the spinel coating, the predicted life of the Crofer 22 APU is significantly longer than that of the uncoated Crofer 22 APU.

Liu, Wenning N.; Sun, Xin; Stephens, Elizabeth V.; Khaleel, Mohammad A.

2009-04-15T23:59:59.000Z