GRR/Section 8-TX-b - ERCOT Interconnection | Open Energy Information  

Open Energy Info (EERE)

8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection Process.pdf Click to View Fullscreen Regulations & Policies PUCT Substantive Rule 25.198 Triggers None specified Click "Edit With Form" above to add content 8-TX-b - ERCOT Interconnection Process.pdf 8-TX-b - ERCOT Interconnection Process.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedures for interconnection with Electricity Reliability Council of Texas (ERCOT) in Texas. According to PUCT Substantive Rule 25.198, the responsibility for

2

Western Interconnection Synchrophasor Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Synchrophasor measurements are a type of...

3

ERCOT | OpenEI  

Open Energy Info (EERE)

ERCOT ERCOT Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago) Keywords buildings carbon dioxide emissions carbon footprinting CO2 commercial buildings electricity emission factors ERCOT hourly emission factors interconnect nitrogen oxides NOx SO2 sulfur dioxide emissions

4

NREL Variability Analysis for the Western Interconnect (Presentation)  

SciTech Connect (OSTI)

This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

5

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Aggregator Programs. Demand Response Measurement andIncorporating Demand Response into Western Interconnection13 Demand Response Dispatch

Satchwell, Andrew

2014-01-01T23:59:59.000Z

6

10 Year Transmission Plan for the Western Electricity Interconnection  

Broader source: Energy.gov (indexed) [DOE]

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

7

National Electric Transmission Study 2006 Western Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Western Interconnection Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006 2 Western Interconnection 2006 Congestion Study - DOE Task 3 - 1. 2008 Modeling Study 2. 2015 Modeling Study - 2015 Planned Resource Development (IRPs and RPS) 3. W.I. Historical Path Usage Studies - 1999 thru 2005 - Physical congestion - Commercial congestion 3 WCATF Modeling Studies ABB Gridview Model * Model uses WECC 2005 L&R load forecast, modified with NPCC data for the NW, RMATS load forecasts for the Rocky Mtn area and the latest CEC load forecast for California * Hourly load shapes were developed using FERC 714 * Incremental transmission was added to a WECC 2008 case to represent 2015 network topology * WECC path ratings were used, modified as necessary to more closely

8

ERCOT Demand Response Paul Wattles  

E-Print Network [OSTI]

ERCOT Demand Response Paul Wattles Senior Analyst, Market Design & Development, ERCOT Whitacre;Definitions of Demand Response · `The short-term adjustment of energy use by consumers in response to price to market or reliability conditions.' (NAESB) #12;Definitions of Demand Response · The common threads

Mohsenian-Rad, Hamed

9

Impact of High Solar Penetration in the Western Interconnection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of High Solar Penetration Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Technical Report NREL/TP-5500-49667 December 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Prepared under Task No. SM101610

10

Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)  

SciTech Connect (OSTI)

This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-10-01T23:59:59.000Z

11

ERCOT Wind Scraper | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » ERCOT Wind Scraper Jump to: navigation, search Tool Summary Name: ERCOT Wind Scraper Agency/Company /Organization: Prof. Mack Grady, Baylor University Sector: Energy Focus Area: Wind Resource Type: Software/modeling tools User Interface: Desktop Application Website: web.ecs.baylor.edu/faculty/grady/ OpenEI Keyword(s): Community Generated ERCOT Wind Scraper Screenshot References: W. Mack Grady[1] ERCOT Wind Scraper retrieves, displays, and logs minute-by-minute system generation, load, and wind generation from ERCOT's public web site. ERCOT Wind Scraper retrieves, displays, and logs minute-by-minute system generation, load, and wind generation from ERCOT's public web site. Instructions are included in a zipped file along with the program.

12

OE Releases "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012"  

Broader source: Energy.gov [DOE]

The "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012" document, which is now available for downloading, is a compilation of publicly-available data on transmission constraints and congestion for the period 2009 through 2012.

13

ERCOT's Weather Sensitive Demand Response Pilot  

E-Print Network [OSTI]

ERCOTs Weather Sensitive Demand Response Pilot CATEE 12-17-13 ESL-KT-13-12-21 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Disclaimer The information contained in this report has been obtained from... Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Weather Sensitive Loads Pilot CATEE 121313 - Tim Carter 713-646-5476 tim.carter@constellation.com4 Constellation's Integrated Power Products 2013. Constellation Energy Resources, LLC...

Carter, T.

2013-01-01T23:59:59.000Z

14

Impact of High Solar Penetration in the Western Interconnection  

SciTech Connect (OSTI)

This paper presents an overview of the variable characteristics of solar power, as well as the accompanying grid dynamic performance and operational economics for a system with significant solar generation. The paper will show results of economic operational simulations of a very high solar generation future for the western half of the United States.

Lew, D.; Miller, N.; Clark, K.; Jordan, G.; Gao, Z.

2010-12-01T23:59:59.000Z

15

Integrated Energy-Water Planning in the Western and Texas Interconnections  

SciTech Connect (OSTI)

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

Vincent Tidwell; John Gasper; Robert Goldstein; Jordan Macknick; Gerald Sehlke; Michael Webber; Mark Wigmosta

2013-07-01T23:59:59.000Z

16

Shift factors in ERCOT congestion pricing  

E-Print Network [OSTI]

and engineering aspects of its implementation. I investigate the economic inefficiencies that are due, I discuss the ERCOT zonal and local congestion management scheme and analyze various economic of scarce transmission resources, 2. provision of economic signals for dispatch, 3. provision of economic

Baldick, Ross

17

Topic A" Awardee: Western Electricity Coordinating Council | Department of  

Broader source: Energy.gov (indexed) [DOE]

A" Awardee: Western Electricity Coordinating A" Awardee: Western Electricity Coordinating Council Topic A" Awardee: Western Electricity Coordinating Council Regional Transmission Expansion Planning (RTEP) The America Recovery and Reinvestment Act (ARRA) directs the Department of Energy (DOE) to provide assistance for the development of interconnection-based transmission plans for the Eastern and Western Interconnections, and for ERCOT. WECC received notification from the U.S. Department of Energy (DOE) on December 18, 2009 that it has been awarded $14.5 million in funding from the ARRA to conduct interconnection-wide electric transmission planning studies in the Western Interconnection. The funding allows WECC to significantly expand existing regional transmission planning activities and broaden stakeholder involvement in

18

Electricity Reliability Council of Texas (ERCOT) | Open Energy Information  

Open Energy Info (EERE)

Electricity Reliability Council of Texas (ERCOT) Electricity Reliability Council of Texas (ERCOT) Jump to: navigation, search The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers - representing 85 percent of the state's electric load and 75 percent of the Texas land area. As the independent system operator for the region, ERCOT schedules power on an electric grid that connects 40,000 miles of transmission lines and more than 550 generation units. ERCOT also manages financial settlement for the competitive wholesale bulk-power market and administers customer switching for 6.5 million Texans in competitive choice areas. News ERCOT gathers wind data from cellphone towers References ERCOT This article incorporates public domain material from the document:

19

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection  

SciTech Connect (OSTI)

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

2013-03-01T23:59:59.000Z

20

Microsoft Word - Load Availability Profiles and Constraints for the Western Interconnect_102513_clean.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7E 7E Grid Integration of Aggregated Demand Response, Part I: Load Availability Profiles and Constraints for the Western Interconnection Daniel J. Olsen, Nance Matson, Michael D. Sohn, Cody Rose, Junqiao Dudley, Sasank Goli, and Sila Kiliccote Lawrence Berkeley National Laboratory Marissa Hummon, David Palchak, Paul Denholm, and Jennie Jorgenson National Renewable Energy Laboratory Ookie Ma U.S. Department of Energy September 2013 Disclaimer Acknowledgements Abstract Foreword Table of Contents List of Figures List of Tables Executive Summary Introduction ≤ ≤ ≤

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Value of Improved Wind Power Forecasting in the Western Interconnection (Poster)  

SciTech Connect (OSTI)

Wind power forecasting is a necessary and important technology for incorporating wind power into the unit commitment and dispatch process. It is expected to become increasingly important with higher renewable energy penetration rates and progress toward the smart grid. There is consensus that wind power forecasting can help utility operations with increasing wind power penetration; however, there is far from a consensus about the economic value of improved forecasts. This work explores the value of improved wind power forecasting in the Western Interconnection of the United States.

Hodge, B.

2013-12-01T23:59:59.000Z

22

Property:EIA/861/IsoErcot | Open Energy Information  

Open Energy Info (EERE)

IsoErcot IsoErcot Jump to: navigation, search Property Name ISO_ERCOT Property Type Boolean Description Indicates that the organization conducts operations in the ERCOT ISO region [1] References ↑ "EIA Form EIA-861 Final Data File for 2010 - 861 Webfile Layout for 2010.doc" Pages using the property "EIA/861/IsoErcot" Showing 25 pages using this property. (previous 25) (next 25) A AEP Texas Central Company + true + AEP Texas North Company + true + AP Holdings LLC + true + APNA Energy + true + Alliance Power Co LLC + true + AmeriPower LLC + true + B Bandera Electric Coop, Inc + true + Bluebonnet Electric Coop, Inc + true + Bounce Energy, Inc. + true + Brazos Electric Power Coop Inc + true + Brazos River Authority + true + Brownsville Public Utilities Board + true +

23

Property:EIA/861/NercErcot | Open Energy Information  

Open Energy Info (EERE)

NercErcot NercErcot Jump to: navigation, search This is a property of type Boolean. Description: Nerc Ercot Entity conducts business operations within the TRE region (TRE=Texas Regional Entity (formerly ERCOT) (Y or N) [1] References ↑ EIA Form EIA-861 Final Data File for 2008 - F861 File Layout-2008.doc Pages using the property "EIA/861/NercErcot" Showing 25 pages using this property. (previous 25) (next 25) A AEP Texas Central Company + true + AEP Texas North Company + true + Alliance Power Co LLC + true + Ambit Energy, L.P. + true + AmeriPower LLC + true + Amigo Energy + true + Austin Energy + true + B BP Energy Company + true + Bandera Electric Coop, Inc + true + Bartlett Electric Coop, Inc + true + Big Country Electric Coop, Inc + true + Bluebonnet Electric Coop, Inc + true +

24

RidgenoseSolarInterconnectionProject  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cliffrose Solar Energy Interconnection Project DOEEA-1989 Western Area Power Administration (Western) is responding to a request from Longview Solar, LLC, to interconnect their...

25

Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint  

SciTech Connect (OSTI)

During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the Western Interconnection there are many balancing areas, which will result in challenges if there is significant wind and solar energy development in the region. A recent proposal to the Western Electricity Coordinating Council suggests a regional energy imbalance service (EIS). To evaluate this EIS, a number of analyses are in process or are planned. This paper describes one part of an analysis of the EIS's implication on operating reserves under several alternative scenarios of the market footprint and participation. We improve on the operating reserves method utilized in the Eastern Wind Integration and Transmission Study and apply this modified approach to data from the Western Wind and Solar Integration Study.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-07-01T23:59:59.000Z

26

Analysis of the Impact of Balancing Area Cooperation on the Operation of the Western Interconnection with Wind and Solar Generation (Presentation)  

SciTech Connect (OSTI)

This presentation describes the analysis of the impact of balancing area cooperation on the operation of the Western Interconnection with wind and solar generation, including a discussion of operating reserves, ramping, production simulation, and conclusions.

Milligan, M.; Lew, D.; Jordan, G.; Piwko, R.; Kirby, B.; King, J.; Beuning, S.

2011-05-01T23:59:59.000Z

27

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Broader source: Energy.gov (indexed) [DOE]

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

28

ERCOT's Dynamic Model of Wind Turbine Generators: Preprint  

SciTech Connect (OSTI)

By the end of 2003, the total installed wind farm capacity in the Electric Reliability Council of Texas (ERCOT) system was approximately 1 gigawatt (GW) and the total in the United States was about 5 GW. As the number of wind turbines installed throughout the United States increases, there is a greater need for dynamic wind turbine generator models that can properly model entire power systems for different types of analysis. This paper describes the ERCOT dynamic models and simulations of a simple network with different types of wind turbine models currently available.

Muljadi, E.; Butterfield, C. P.; Conto, J.; Donoho, K.

2005-08-01T23:59:59.000Z

29

Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection  

SciTech Connect (OSTI)

This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

King, J.; Kirby, B.; Milligan, M.; Beuning, S.

2012-05-01T23:59:59.000Z

30

interconnect | OpenEI  

Open Energy Info (EERE)

interconnect interconnect Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago) Keywords buildings carbon dioxide emissions carbon footprinting CO2 commercial buildings electricity emission factors ERCOT hourly emission factors interconnect nitrogen oxides NOx

31

Relationship Between Wind Generation and Balancing Energy Market Prices in ERCOT: 2007-2009  

SciTech Connect (OSTI)

This paper attempts to measure the average marginal effects of wind generation on the balancing-energy market price in ERCOT with the help of econometric analysis.

Nicholson, E.; Rogers, J.; Porter, K.

2010-11-01T23:59:59.000Z

32

Flexibility Reserve Reductions from an Energy Imbalance Market with High Levels of Wind Energy in the Western Interconnection  

SciTech Connect (OSTI)

The anticipated increase in variable generation in the Western Interconnection (WI) over the next several years has raised concerns about how to maintain system balance, especially in smaller Balancing Areas (BAs). Given renewable portfolio standards in the West, it is possible that more than 50 gigawatts (GW) of wind capacity will be installed by 2020. Significant quantities of solar generation are likely to be added as well. The consequent increase in variability and uncertainty that must be managed by the conventional generation fleet and responsive load make it attractive to consider ways in which Balancing Area Authorities (BAAs) can pool their variability and response resources, thus taking advantage of geographic and temporal diversity to increase overall operational efficiency. Our analysis considers several alternative forms of an Energy Imbalance Market (EIM) that have been proposed in the non-market areas of the WI. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: BAA cooperation and sub-hourly dispatch. As proposed, the EIM does not consider any form of coordinated unit commitment; however, over time it is possible that BAAs would develop formal or informal coordination plans. This report examines the benefits of several possible EIM implementations, both separately and in concert.

King, J.; Kirby, B.; Milligan, M.; S. Beuning

2011-10-01T23:59:59.000Z

33

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt...  

Energy Savers [EERE]

Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska SUMMARY DOE's Western Area...

34

Application to Export Electric Energy OE Docket No. EA-403 Frontera Marketing, LLC- Motion to Intervene of Electric Reliability Council of Texas, Inc (ERCOT)  

Broader source: Energy.gov [DOE]

ERCOT submits this motion to intervene in the referenced proceeding of Frontera Marketing application to export electric energy to Mexico.

35

Interconnection Panel  

Broader source: Energy.gov [DOE]

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the interconnection panel, including an overview of the generation interconnection process (GIP), and interconnection agreements and their terms.

36

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

37

Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Panel Dan Tunnicliff, P.E. Manager, Government Segment, Southern California Edison Southern California Edison Application Processing Technical Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Overview of Generation Interconnection Process (GIP) * Transmission Level Interconnections - Governed by CAISO Tariff. * Generally for 220 kV and higher. * All applications must be submitted to the CAISO. * CAISO administers its tariff, which is approved by FERC. * Distribution Level Interconnections - Governed by SCE's WDAT. * Generally below 220 kV. * All applications must be submitted to SCE. * SCE administers its tariff, which is approved by FERC. 2 Southern California Edison Interconnection agreements are critically

38

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Cooperation Among States in the Western Interconnection on Electric Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

39

Sandia National Laboratories: Energy and Water in the Western...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ProgramEnergy and Water in the Western and Texas Interconnects Energy and Water in the Western and Texas Interconnects Background Objectives Tasks Benefits Outcomes Collaborators...

40

CALCULATING EMISSIONS REDUCTIONS FROM RENEWABLE ENERGY PROGRAMS AND ITS APPLICATION TO THE WIND FARMS IN THE TEXAS ERCOT REGION  

E-Print Network [OSTI]

farm. Details are presented for the wind farm Sweetwater I (Abilene) as well as results from the application of this procedure to all the wind energy providers in the Texas ERCOT region in 2006....

Liu, Z.; Haberl, J.; Baltazar, J. C.; Culp, C.; Yazdani, B.; Chandrasekaran, V.

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41
42

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Interconnect Issues in NE Serge Khalife, 15 th April 2010 Agenda  About National Grid and Service territories  Scope and definitions  Interconnection Process Overview  Time Frames and Fees  Governmental Entity Exceptions  Net Metering Limit  Technical Issues  Observations and recommendations  Questions and Answers Service Territories Map Scope and definitions  The Distributed Generation Group at National Grid process interconnection applications on the distribution system typically 10 MW and under with a few exceptions.  ISO-NE process larger interconnection applications on the transmission system. Their timelines and procedures vary from National Grid's Distributed Generation process.  Governmental Entity : The Commonwealth of Massachusetts, or any

43

Interconnection Resources  

Broader source: Energy.gov [DOE]

Interconnection is the technical procedures and legal requirements surrounding energy customers' ability to connect their small-scale renewable energy projects with the electricity grid. The...

44

Interconnection Standards  

Broader source: Energy.gov [DOE]

In July 2010, the Montana Public Service Commission (PSC) adopted interconnection rules, effective August 13, 2010. These rules apply to all electric utilities under the PSC's jurisdiction,...

45

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decisions lay foundation for exception for utility contracts * Narrow exception GSA - Utility Interconnection Agreements * Application to Interconnection Agreements * Keys: Requirement for service Tariff or PSC action on contract

46

ROD for the Interconnection of the Griffith Power Plant With the Western Area Power Administration's Parker-Davis and Pacific Northwest-Pacific Southwest Intertie Transmission Systems (5/28/99)  

Broader source: Energy.gov (indexed) [DOE]

23 23 Federal Register / Vol. 64, No. 103 / Friday, May 28, 1999 / Notices 129, Main Street, Madison, ME 04950, (207) 696-1225. l. FERC contact: Nan Allen, nan.allen@ferc.fed.us, (202) 219-2948. m. Pursuant to 18 CFR 16.9(b)(1) each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by May 1, 2002. David P. Boergers, Secretary. [FR Doc. 99-13617 Filed 5-27-99; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration [DOE/EIS-0297] Record of Decision for the Interconnection of the Griffith Power Plant With the Western Area Power Administration's Parker-Davis and Pacific Northwest-Pacific Southwest

47

Hopper Interconnect  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interconnect Interconnect Interconnect jaguar xt4 Hopper's "Gemini" network is connected in a 3D torus. Description Hopper's compute nodes are connected via a custom high-bandwidth, low-latency network provided by Cray. The connectivity is in the form of a "mesh" in which each node is connected to other nearby nodes like strands in a fishing net, except that the mesh extends in three dimensions. Each network node handles not only data destined for itself, but also data to be relayed to other nodes. Nodes at the "edges" of the mesh network are connected to nodes at the other edge to form a 3-D torus. The custom chips that route communication over the network are known as "Gemini" and the entire network is often referred to as the "Cray Gemini

48

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration (Desert Southwest Region) is preparing an EA that will assess the potential environmental impacts of a proposal to interconnect the planned Ridgenose Solar Energy Project to Westerns transmission system. Westerns actions could include constructing less than a mile of new transmission line from the solar facility to an existing substation, constructing an interconnection substation, and adding, moving, or modifying structures.

49

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

A, A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

50

Advanced Interconnect Development  

SciTech Connect (OSTI)

The objectives of this project are to develop cost-effective, optimized materials for intermediate temperature SOFC interconnect and interconnect/electrode interface applications and identify and understand degradation processes in interconnects and at their interfaces with electrodes.

Yang, Z.G.; Maupin, G.; Simner, S.; Singh, P.; Stevenson, J.; Xia, G.

2005-01-27T23:59:59.000Z

51

Learn More About Interconnections  

Broader source: Energy.gov [DOE]

North America is comprised of two major and three minor alternating current (AC) power grids or interconnections. The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic...

52

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-01-01T23:59:59.000Z

53

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-10-01T23:59:59.000Z

54

Interconnection | Open Energy Information  

Open Energy Info (EERE)

Interconnection Interconnection Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some state’ standards apply only to investor-owned utilities, – not to municipal utilities and electric cooperatives. [1]

55

Costs for Integrating Wind into the Future ERCOT System with Related Costs for Savings in CO2 Emissions  

Science Journals Connector (OSTI)

The supply from wind increased by more than 200% between 2006 and 2009 (Texas now has the largest installed capacity for wind of all of the states in the U.S., reflecting in large measure the incentives introduced by the PUC in 2005 to fund connections of new systems in CREZ to the existing grid). ... The contribution from wind is particularly important in winter when demand is at a seasonal minimum (impacting thus differentially the shape of the residual coal-gas curve to the right of the demand curve in Figure 2b). ... Banunarayanan, V.; Miller, N.; Chahal, A.; Zandt, D. V.; Freeman, L.; Walling, M.; Martinez, J.; Walling, R. A.Analysis of Wind Generation Impact on ERCOT Ancillary Services Requirements; GE Energy: Fairfield, Connecticut, March 28, 2008, 2008; p 254. ...

Xi Lu; Michael B. McElroy; Nora A. Sluzas

2011-03-04T23:59:59.000Z

56

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, Wyoming  

Broader source: Energy.gov [DOE]

After the applicant withdrew its request to interconnect the proposed Hermosa West Wind Farm Project with Western Area Power Administrations transmission system, Western cancelled preparation of an EIS to evaluate the potential environmental impacts of the proposal.

57

Western Baldwin County, AL Grid Interconnection Project  

SciTech Connect (OSTI)

The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

Thomas DeBell

2011-09-30T23:59:59.000Z

58

Low Carbon Jobs in an Interconnected World | Open Energy Information  

Open Energy Info (EERE)

Jobs in an Interconnected World Jobs in an Interconnected World Jump to: navigation, search Name Low Carbon Jobs in an Interconnected World Agency/Company /Organization Global Climate Network Partner Institute for Public Policy Research Sector Energy Focus Area Energy Efficiency, Renewable Energy Topics Co-benefits assessment, Background analysis Website http://www.ippr.org.uk/publica Country Australia, Brazil, China, Germany, India, Nigeria, South Africa, United Kingdom, United States Australia and New Zealand, South America, Eastern Asia, Western Europe, Southern Asia, Western Africa, Southern Africa, Northern Europe, Northern America References Low Carbon Jobs in an Interconnected World[1] Low Carbon Jobs in an Interconnected World Author: Global Climate Network Price: Free Publication Date: 30 March 2010

59

Interconnect Issues in NE  

Broader source: Energy.gov [DOE]

Presentation covers interconnect issues in the Northeast and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

60

Perforation patterned electrical interconnects  

DOE Patents [OSTI]

This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

Frey, Jonathan

2014-01-28T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

A Methodology for Calculating Emissions Reductions from Renewable Energy Programs and its Application to the Wind Farms in the Texas ERCOT Region  

E-Print Network [OSTI]

1 Energy Systems Laboratory 1 A METHODOLOGY FOR CALCULATING EMISSIONS REDUCTIONS FROM RENEWABLE ENERGY PROGRAMS AND ITS APPLICATION TO THE WIND FARMS IN THE TEXAS ERCOT REGION Zi Liu, Jeff Haberl, Juan-Carlos Baltazar, Kris Subbarao, Charles... on Sweetwater I Wind Farm Capacity Factor Analysis Application to All Wind Farms Uncertainty Analysis Emissions Reduction Summary Energy Systems Laboratory 3 SUMMARYEMISSIONS REDUCTION UNCERTAINTY ANALYSIS APPLICATIONMETHODOLOGYINTRODUCTION Background...

Liu, Z.; Haberl, J.; Baltazar, J. C.; Subbarao, K.; Culp, C.; Yazdani, B.

62

North American Electric Reliability Corporation Interconnections...  

Broader source: Energy.gov (indexed) [DOE]

Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern,...

63

Case Study - Western Electricity Coordinating Council  

Broader source: Energy.gov (indexed) [DOE]

A Smart Grid Strategy for Assuring Reliability of the Western Grid A Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection. WECC and its members manage the operation and planning of the vast interconnected transmission system connecting generators and loads across almost 1.8 million square miles of territory. The Western Interconnection Synchrophasor Program (WISP), led by WECC and involving 18 partners, is an initiative to modernize operation of the transmission system in the Western Interconnection, increasing reliability and system performance, and enabling greater use of renewable resources such as solar, hydro, and wind.

64

Solar cell array interconnects  

DOE Patents [OSTI]

Electrical interconnects are disclosed for solar cells or other electronic components using a silver-silicone paste or a lead-tin (Pb-Sn) no-clean fluxless solder cream, whereby the high breakage of thin (<6 mil thick) solar cells using conventional solder interconnect is eliminated. The interconnects of this invention employs copper strips which are secured to the solar cells by a silver-silicone conductive paste which can be used at room temperature, or by a Pb-Sn solder cream which eliminates undesired residue on the active surfaces of the solar cells. Electrical testing using the interconnects of this invention has shown that no degradation of the interconnects developed under high current testing, while providing a very low contact resistance value. 4 figs.

Carey, P.G.; Thompson, J.B.; Colella, N.J.; Williams, K.A.

1995-11-14T23:59:59.000Z

65

Micro-fluidic interconnect  

SciTech Connect (OSTI)

An apparatus for simultaneously aligning and interconnecting microfluidic ports is presented. Such interconnections are required to utilize microfluidic devices fabricated in Micro-Electromechanical-Systems (MEMS) technologies, that have multiple fluidic access ports (e.g. 100 micron diameter) within a small footprint, (e.g. 3 mm.times.6 mm). Fanout of the small ports of a microfluidic device to a larger diameter (e.g. 500 microns) facilitates packaging and interconnection of the microfluidic device to printed wiring boards, electronics packages, fluidic manifolds etc.

Okandan, Murat (Albuquerque, NM); Galambos, Paul C. (Albuquerque, NM); Benavides, Gilbert L. (Los Ranchos, NM); Hetherington, Dale L. (Albuquerque, NM)

2006-02-28T23:59:59.000Z

66

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

67

Interconnection Standards | Open Energy Information  

Open Energy Info (EERE)

Interconnection Standards Interconnection Standards Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some states’ standards apply only to investor-owned utilities – not to municipal utilities and electric cooperatives. [1]

68

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Solar Wind Program Info State Nevada Program Type Interconnection Provider Public Utilities Commission of Nevada In December 2003, the Nevada Public Utilities Commission (PUC) adopted interconnection standards for customers of NV Energy (formerly Nevada Power and Sierra Pacific Power) with on-site generation up to 20 megawatts (MW) in capacity. These standards are largely consistent with IEEE 1547 standards, California's interconnection rule (California Rule 21) and the model interconnection agreement developed by the National Association of

69

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Energy Sources Solar Wind Program Info State Maine Program Type Interconnection Provider Maine Public Utilities Commission The Maine Public Utility Commission (PUC) adopted interconnection procedures in January 2010. These rules apply to all transmission and distribution utilities operating in the state and apply to all distribution generation (not just renewables). Maine's interconnection procedures, based in part on the Interstate Renewable Energy Council Inc. 2006 Model Interconnection Procedures,* identify four different tiers with

70

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Indiana Program Type Interconnection Provider Indiana Utility Regulatory Commission In November 2005, the Indiana Utility Regulatory Commission (IURC) approved rules governing the interconnection of distributed generation (DG). Indiana's interconnection rules require the state's investor-owned utilities to provide three levels of interconnection to customer-generators.

71

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration is preparing an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near ONeill, Nebraska, to Westerns power transmission system. The project website is http://www.wapa.gov/ugp/Environment/GrandePrairie.htm.

72

EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town  

Broader source: Energy.gov (indexed) [DOE]

84: Invenergy Interconnection for the Wray Wind Energy 84: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO Summary DOE's Western Area Power Administration prepared this EA to evaluate the environmental impacts of interconnecting the proposed Wray Wind Energy Project, for approximately 90 megawatts of wind generation, to Western's existing Wray Substation in Yuma County, Colorado. Public Comment Opportunities None available at this time. Documents Available for Download December 27, 2012 EA-1884: Finding of No Significant Impact Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO December 27, 2012 EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray,

73

Central American electrical interconnection  

SciTech Connect (OSTI)

A technical cooperation grant of $2.25 million, designed to strengthen the capacity of Central American countries to operate their regional interconnected electrical system, was announced by the Inter-American Development Bank (IDB). The grant, extended from the banks Fund for Special Operations, will help improve the capacity of the regions electric power companies to achieve economical, safe operation of the interconnected electric power systems. The funds will also be used to finance regional studies of the accords, procedures, regulations, and supervisory mechanisms for the system, as well as program development and data bases.

Not Available

1988-12-01T23:59:59.000Z

74

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Michigan Program Type Interconnection Provider Michigan Public Service Commission The Michigan Public Service Commission (PSC) first adopted interconnection standards for distributed generation (DG) in September 2003. The original standards provided for 5 levels of interconnection with cutoffs at 30 kilowatts (kW), 150 kW, 750 kW, and 2 megawatts (MW), but left many details

75

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Oregon Program Type Interconnection Provider Oregon Public Utility Commission Oregon has three separate interconnection standards: one for net-metered systems, one for small generator facilities (non-net metered systems) and one for large generator facilities (non-net metered systems). Oregon has also established separate net metering requirements and interconnection standards for the state's primary investor-owned utilities (PGE and

76

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State District of Columbia Program Type Interconnection Provider Washington Utilities and Transportation Commission In September 2007, the Washington Utilities and Transportation Commission (UTC) adopted interconnection standards for distributed generation (DG) systems up to 20 megawatts (MW) in capacity. The revised standards provide for two separate levels of interconnection based on system capacity. The

77

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Kentucky Program Type Interconnection Provider Kentucky Public Service Commission In April 2008, Kentucky enacted legislation which required the Kentucky Public Service Commission (PSC) to develop interconnection and net metering guidelines for all retail electric suppliers operating in Kentucky (excluding TVA utilities). The Kentucky PSC adopted those guidelines on January 8, 2009 (Order 2008-00169). The PSC's rules set forth a two-tiered approach to simplify the interconnection process:

78

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Wind Program Info State Maryland Program Type Interconnection Provider Maryland Public Service Commission In April 2007, Maryland enacted legislation ([http://mgaleg.maryland.gov/2007RS/chapters_noln/Ch_119_sb0595E.pdf S.B. 595]) requiring the Maryland Public Service Commission (PSC) to form a small generator interconnection working group to develop interconnection standards and procedures that are "consistent with nationally adopted

79

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New York Program Type Interconnection Provider New York State Department of Public Service New York first adopted uniform interconnection standards in 1999 (see history below). The Standard Interconnection Requirements (SIR) have subsequently been amended several times since, most recently with the adoption of far reaching revisions in February 2009. Several more minor

80

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Connecticut Program Type Interconnection Provider Public Utilities Regulatory Authority In December 2007, the Connecticut Department of Public Utility Control (DPUC) now called the Public Utilities Regulatory Authority (PURA) approved new interconnection guidelines for distributed energy systems up to 20 megawatts (MW) in capacity. Connecticut's interconnection guidelines apply to the state's two investor-owned utilities -- Connecticut Light and Power

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Energy Sources Solar Wind Program Info State Delaware Program Type Interconnection Provider Delaware Public Service Commission '''''Note: Delaware law ([http://delcode.delaware.gov/title26/c010/index.shtml#1014 26 Del. C. § 1014]) requires the Delaware Public Service Commission (PSC), Delaware Electric Cooperative (DEC), and municipal utilities to develop interconnection rules using as a guide the Interstate Renewable Energy Council's (IREC) model interconnection rules and the U.S. Department of

82

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Arizona Program Type Interconnection Provider Arizona Corporation Commission '''''Note: In June 2007, the Arizona Corporation Commission (ACC) initiated a rulemaking process to establish statewide interconnection standards for distributed generation (DG). This proceeding is still in progress. Until the new official rules go into effect, the commission has recommended that the utilities use the [http://images.edocket.azcc.gov/docketpdf/0000074361.pdf Interconnection

83

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Hawaii Program Type Interconnection Provider Hawaii Public Utilities Commission Hawaii has established simplified interconnection rules for small renewables and separate rules for all other distributed generation (DG). For inverter-based systems up to 10 kilowatts (kW) in capacity (and inverter-based DG under 250 kW on islands other than Kauai), there is a simple application process for interconnection. Systems must use inverters

84

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Pennsylvania Program Type Interconnection Provider Pennsylvania Public Utility Commission The Pennsylvania Public Utilities Commission was required to adopt interconnection standards and net-metering rules by the Alternative Energy Portfolio Standards Act of 2004.The PUC subsequently adopted interconnection standards for net-metered distributed generation (DG)

85

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State South Dakota Program Type Interconnection Provider S.D. Public Utilities Commission South Dakota's interconnection standards for distributed generation, adopted by the state Public Utilities Commission (PUC) in May 2009, apply to customers of investor-owned utilities.* The rules provide for four levels of interconnection for systems up to 10 megawatts (MW) in capacity:

86

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State North Carolina Program Type Interconnection Provider North Carolina Utilities Commission The North Carolina Utilities Commission (NCUC) adopted comprehensive interconnection standards for distributed generation in June 2008. The NCUC standards, which are similar to the Federal Energy Regulatory Commission's (FERC) interconnection standards for small generators,

87

VLSI interconnect Avinoam Kolodny  

E-Print Network [OSTI]

1000 10000 100000 Length [um] Power Local total Global total TOTAL globallocal Power Distribution by Wirelength · Total Dynamic Power · Global clock ­ not included · Local signals nets = 66% · Global signals global signals Total dynamic power (Gate, Diffusion and Interconnect) local clock global signals global

Kolodny, Avinoam

88

Reversible concentric ring microfluidic interconnects  

E-Print Network [OSTI]

A reversible, Chip-to-Chip microfluidic interconnect was designed for use in high temperature, high pressure applications such as chemical microreactor systems. The interconnect uses two sets of concentric, interlocking ...

Thompson, Mary Kathryn, 1980-

2004-01-01T23:59:59.000Z

89

Webinar: Understanding the Interconnection and Transmission Service Queues  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Understanding the Interconnection and Transmission Service Webinar: Understanding the Interconnection and Transmission Service Queues Webinar: Understanding the Interconnection and Transmission Service Queues March 5, 2012 - 6:10pm Addthis This webinar will take place March 28, 2012, from 11 a.m.-12:30 p.m. MDT. Hosted by the U.S. Department of Energy's (DOE's) Office of Indian Energy Policy and Programs, DOE's Tribal Energy Program, the Environmental Protection Agency (EPA), and the Western Area Power Administration, this Web seminar will answer the following questions: What is the large generator interconnection procedure? How is transmission service requested? What does this mean for Tribes interested in gaining access to the transmission system? This is the fifth in a series of webinars that will run through September 2012.

90

Utility Wind Integration Group Distributed Wind/Solar Interconnection  

Broader source: Energy.gov (indexed) [DOE]

Utility Wind Integration Group Distributed Wind/Solar Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop May 21, 2013 8:00AM MDT to May 22, 2013 5:00PM MDT Golden, Colorado This two-day workshop will answer your questions about interconnecting wind and solar plants and other distributed generation applications to electric distribution systems while providing insight on integrating large-scale renewable generation into the transmission system. Held at the National Renewable Energy Laboratory's (NREL) state-of-the-art Energy Systems Integration Facility (ESIF) on the first day and at the Western Area Power Administration's Electric Power Training Center (EPTC) on the second day, the workshop will provide an overview of wind and solar interconnection

91

Electricity Advisory Committee Meeting Presentations October 2011 -  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Processes Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes Panel Discussion on Interconnection-Wide Transmission Planning Processes Interconnection-Wide Planning in the Eastern Interconnection - David Whiteley, Eastern Interconnection Planning Collaborative WECC Regional Transmission Expansion Planning (RTEP)10 year plan - Brad Nickell, Western Electricity Coordinating Council Transmission Planning in the ERCOT Interconnection 2011 - Warren Lasher, Electric Reliability Council of Texas EAC Presentation - Interconnection-Wide Planning in the Eastern Interconnection 2011 - Whiteley.pdf EAC Presentation - WECC Regional Transmission Expansion Planning (RTEP)10

92

North American Electric Reliability Corporation Interconnections...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

93

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Solar Wind Program Info State Iowa Program Type Interconnection Provider Iowa Utilities Board Different rules govern the interconnection of distributed generation facilities in Iowa, depending on whether or not the interconnection is with a utility whose rates are regulated by the Iowa Utilities Board (IUB). Rate regulated utilities include only the state's two investor-owned utilities -- MidAmerican Energy and Interstate Power and Light (IPL) -- and Linn

94

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State New Jersey Program Type Interconnection Provider New Jersey Board of Public Utilities New Jersey's interconnection standards apply statewide to all electric distribution utilities, but not to the small number of municipal utilities and electric cooperatives in the state. The rules, first adopted in 2001, have been revised several times since their inception, most recently in May 2012. The current standards include the following basic provisions:

95

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Nonprofit Residential Schools Utility Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Colorado Program Type Interconnection Provider Colorado Public Utilities Commission In December 2005, the Colorado Public Utilities Commission (PUC) adopted standards for net metering and interconnection, as required by Amendment 37, a renewable-energy ballot initiative approved by Colorado voters in November 2004. The PUC standards generally apply to utilities with 40,000 or more customers and all cooperative utilities.*

96

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Home Weatherization Wind Program Info State Florida Program Type Interconnection Provider Florida Public Service Commission In March 2008, the Florida Public Service Commission (PSC) adopted interconnection rules for renewable-energy systems up to two megawatts (MW) in capacity. The PSC rules apply only to the state's investor-owned utilities; the rules do not apply to electric cooperatives or municipal

97

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Program Info State Vermont Program Type Interconnection Provider Vermont Public Service Board Vermont has adopted separate interconnection standards for net-metered energy systems that are 150 kW or less, and for all other distributed-generation (DG) systems. '''Interconnection Standards for Net-Metered Systems 150 kW or less''' Vermont requires electric utilities to offer net metering to all customers with photovoltaic (PV) systems, wind-energy systems, fuel cells or

98

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Wisconsin Program Type Interconnection Provider Public Service Commission of Wisconsin In February 2004, the Wisconsin Public Service Commission adopted interconnection standards for distributed generation (DG) systems up to 15 megawatts (MW) in capacity. All investor-owned utilities (IOUs) and municipal utilities are required to abide by the standard provisions.

99

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State South Carolina Program Type Interconnection Provider Public Service Commission of South Carolina The South Carolina Public Service Commission (PSC) adopted simplified interconnection guidelines for small distributed generation (DG) in December 2006. These guidelines address renewable-energy systems and other forms of DG up to 20 kilowatts (kW) in capacity for residential systems,

100

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Texas Program Type Interconnection Provider Public Utility Commission of Texas The Texas Public Utility Regulatory Act (PURA) of 1999 included a provision that "a customer is entitled to have access to on-site distributed generation". As a result, the Public Utility Commission of Texas (PUCT) adopted interconnection standards in 1999. The rules apply to electrical generating facilities (consisting of one or more on-site distributed-generation units) located at a customer's point of delivery,

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Minnesota Program Type Interconnection Provider Minnesota Public Utilities Commission Minnesota's net-metering law, enacted in 1983, applies to all investor-owned utilities, municipal utilities and rural electric cooperatives. Qualifying facilities of less than 1,000 kilowatts (kW) are eligible for net metering. However, uniform interconnection regulations were not implemented when net metering was established.

102

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Industrial Residential Savings Category Bioenergy Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State Nebraska Program Type Interconnection Provider Nebraska Energy Office Nebraska enacted legislation in May 2009 [http://nebraskalegislature.gov/FloorDocs/101/PDF/Final/LB436.pdf (LB 436)], establishing general rules for interconnecting and net metering systems that generate electricity. Nebraska's policy applies to systems that use solar, wind, methane, biomass, hydropower or geothermal resources to produce electricity and have a rated capacity of 25 kilowatts (kW) or less. To be eligible, a facility must meet all applicable safety, performance,

103

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Solar Wind Program Info State Virginia Program Type Interconnection Provider Virginia State Corporation Commission Virginia has two interconnection standards: one for net-metered systems and one for systems that are not net-metered. '''Interconnection for Net-Metered Systems''' Customer-generators that net meter must comply with the interconnection rules within the regulations governing net metering (20 VAC 5-315-40). These rules apply to residential customers generating up to 10 kW* and commercial systems of up to 500 kW (or greater if the utility's net

104

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State New Hampshire Program Type Interconnection Provider New Hampshire Public Utilities Commission New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity using solar, wind, geothermal, hydro, tidal, wave, biomass, landfill gas, bio-oil or

105

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State Missouri Program Type Interconnection Provider Missouri Department of Natural Resources Missouri enacted legislation (S.B. 54) in June 2007 requiring all of the state's electric utilities -- including municipal utilities and electric cooperatives -- to offer net metering to customers with systems up to 100 kilowatts (kW) in capacity that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells

106

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New Mexico Program Type Interconnection Provider New Mexico Public Regulation Commission Interconnection in New Mexico is governed by New Mexico Public Regulation Commission (PRC) Rule 568 and Rule 569. These rules, adopted in July 2008, revised and clarified the state's existing rules. Rule 569 applies to all qualifying facilities (QFs) under PURPA, which generally includes all renewable-energy systems and combined-heat-and-power (CHP) systems up to 80

107

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Ohio Program Type Interconnection Provider Ohio Public Utilities Commission '''''Note: In July 2012, the Public Utilities Commission of Ohio (PUCO) opened a docket ([http://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=12-2051&x=0&y=0 Case 12-0251-EL-ORD]) to review the net metering and interconnection rules for investor-owned utilities. Details will be posted as more information is available.'''''

108

interconnect region | OpenEI  

Open Energy Info (EERE)

interconnect region interconnect region Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

109

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alternative Fuel Vehicles Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Utah Program Type Interconnection Provider Utah Public Service Commission Utah requires the state's only investor-owned utility, Rocky Mountain Power (RMP), and most electric cooperatives* to offer net metering to customers who generate electricity using solar energy, wind energy, hydropower, hydrogen, biomass, landfill gas, geothermal energy, waste gas or waste heat capture and recovery. The bill that established net metering also established some basic rules for interconnection. In April 2010, the Utah Public Service Commission (PSC) adopted final rules for interconnection. The rules described below took effect April 30, 2010.

110

Trinity Public Utilities District Direct Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

LEAD FEDERAL AGENCY: U.S. Department of Energy LEAD FEDERAL AGENCY: U.S. Department of Energy COOPERATING AGENCIES: U.S. Forest Service, U.S. Bureau of Land Management, U.S. Bureau of Reclamation TITLE: Final Environmental Impact Statement for the Trinity Public Utilities District Direct Interconnection Project, DOE/EIS-0389 LOCATION: Trinity County, California CONTACT: For additional information on this For general information on the final environmental impact U.S. Department of Energy National statement, contact: Environmental Policy Act process, write or call: Mr. Mark J. Wieringa Ms. Carol M. Borgstrom, Director Western Area Power Administration Office of NEPA Policy and Compliance P.O. Box 281213 Health, Safety and Security (GC-20) Lakewood, CO 80228 U.S. Department of Energy

111

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings  

Broader source: Energy.gov (indexed) [DOE]

37: Interconnection of the Buffalo Ridge III Wind Project, 37: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota Summary This EIS evaluates the environmental impacts of a proposal to interconnect the Heartland Wind, LLC, proposed Buffalo Ridge III Wind Project in Brookings and Deuel Counties, South Dakota, to DOE's Western Area Power Administration transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 29, 2012 EIS-0437: Notice of Cancellation of an Environmental Impact Statement Proposed Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD

112

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project,  

Broader source: Energy.gov (indexed) [DOE]

8: Interconnection of the Proposed Hermosa West Wind Farm 8: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY SUMMARY This EIS will evaluate the environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, with DOE's Western Area Power Administration's existing Craig-Ault 345-kilovolt transmission line. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 5, 2012 EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY January 14, 2010 EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings

113

Interconnection Agreements for Onsite Generation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Agreements Interconnection Agreements for Onsite Generation Office of Real Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception

114

Optically Interconnected MulticomputersUsing  

E-Print Network [OSTI]

Optically Interconnected MulticomputersUsing Inverted-GraphTopologies Tosuccessfullyexploitthebenefitsofopticaltechnologyinatightlycoupledmulticomputer, the architecturaldesignmust reflectboth the advantages and limitationsof optics. This article systems. Although optics have con- tributed dramatically to long-distance communi- cation and more

Krchnavek, Robert R.

115

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State California Program Type Interconnection Provider California Public Utilities Commission '''''Note: The California Public Utilities Commission (CPUC) approved a [http://docs.cpuc.ca.gov/EFILE/MOTION/162852.PDF proposed settlement] in September 2012, enacting the first fundamental redesign of Rule 21 since 2000. The complete revised Rule 21 Tariff, as described at a high level below, can be found beginning on page 136 of CPUC Decision 12-09-018. The individual tariffs adopted by the utilities can be found on the CPUC web

116

CAD implications of new interconnect technologies  

Science Journals Connector (OSTI)

This paper looks at the CAD implications of possible new interconnect technologies. We consider three technologies in particular: three dimensional ICs, carbon nanotubes as a replacement for metal interconnects, and optical interconnections for longer ... Keywords: 3D interconnect, On-chip optical, nanotubes

Louis K. Scheffer

2007-06-01T23:59:59.000Z

117

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Broader source: Energy.gov (indexed) [DOE]

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

118

Topic B Awardee: Western Governors' Association | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Western Governors' Association Western Governors' Association Topic B Awardee: Western Governors' Association For the Topic A input requirements of the award, the states and provinces in the Western Interconnection have formed a new committee -- the State and Provincial Steering Committee -- to provide input in regional transmission planning and analysis in the interconnection. The Committee will consist of representatives from each state and province in the Western Interconnection. Pending formal announcement, the Committee is preparing to carry out the Topic A input tasks as outlined in Topic B of the U.S. Department of Energy transmission funding opportunity announcement issued in June 2009. A preliminary meeting of the Steering Committee was held in Tempe, AZ on November 6, 2009.

119

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Environmental Energy Technologies Division July 2013 Theprograms types: pricing with enabling technology, pricingwithout enabling technology, direct load control,

Satchwell, Andrew

2014-01-01T23:59:59.000Z

120

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Final Report. Prepared for Xcel Energy. Nexant. 2010. Systemin Section 2.2. PSCO Customer-Funded EE Programs (Xcel):Xcel staff indicated that the load forecast provided to WECC

Barbose, Galen

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

WALC WAUW WECC Total SPSC High DSM Case Non- Coincident PeakCAGRs (2010-2032) WECC Reference Case SPSC High DSM CaseQuan, 2010, Incorporating DSM into the Load Forecast.

Barbose, Galen

2014-01-01T23:59:59.000Z

122

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Springs Utilities Demand-Side Management Potential Study and2009. Idaho Power Demand Side Management Potential Study.2012 Long-Term Demand Side Management Plan. Pending further

Barbose, Galen

2014-01-01T23:59:59.000Z

123

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

response DSM Demand Side Management EE energy efficiencywith the development of demand-side management (DSM)-related

Satchwell, Andrew

2014-01-01T23:59:59.000Z

124

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Columbia Transmission Corporation BPA Bonneville Powerthis treatment vary. For BPA and most of the northwesternPACW broader adjustment BPA, CHPD, DOPD, GCPD, TPWR: Impact

Barbose, Galen

2014-01-01T23:59:59.000Z

125

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Interruptible Program BPA Bonneville Power AdministrationIID LADWP SMUD TID AESO BCTC AVA BPA CHPD DOPD GCPD IPC NWMTIID LADWP SMUD TID AESO BCTC AVA BPA CHPD DOPD GCPD IPC NWMT

Satchwell, Andrew

2014-01-01T23:59:59.000Z

126

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Power Administration CFE Comision Federal de Electricidadnon-U.S. BAs (AESO, BCTC, and CFE), no adjustment was madeNo adjustment AESO, BCTC, CFE: U.S. federal standards not

Barbose, Galen

2014-01-01T23:59:59.000Z

127

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

CBP Capacity Bidding Program CFE Comision Federal dePGN PSE SCL TPWR WAUW APS CFE EPE NEVP PACE PNM PSCO SPP SRPPGN PSE SCL TPWR WAUW APS CFE EPE NEVP PACE PNM PSCO SPP SRP

Satchwell, Andrew

2014-01-01T23:59:59.000Z

128

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

2010. Improving Energy Efficiency for Albertas IndustrialEnergy Assessment of Energy Efficiency Potentials (2010-2010. Improving Energy Efficiency for Albertas Industrial

Barbose, Galen

2014-01-01T23:59:59.000Z

129

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

s December 2009, California Energy Demand 2010-2020 Adoptedsavings from both energy efficiency and demand response. Weto the annual energy and peak demand in 2021. See Appendix A

Barbose, Galen

2014-01-01T23:59:59.000Z

130

Learn More About Interconnections | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Learn More About Learn More About Interconnections Learn More About Interconnections Learn More About Interconnections EASTERN INTERCONNECTION North America is comprised of two major and three minor alternating current (AC) power grids or "interconnections." The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic coast (excluding Québec), South to Florida and West to the foot of the Rockies (excluding most of Texas). All of the electric utilities in the Eastern Interconnection are electrically tied together during normal system conditions and operate at a synchronized frequency operating at an average of 60Hz. Click here for more information. DOE is in the process of issuing awards to two entities in the Eastern Interconnection: one to the Eastern Interconnection Planning

131

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State West Virginia Program Type Interconnection Provider West Virginia Public Service Commission In 2006, West Virginia stakeholders came together to consider net metering, interconnection as required by the Federal Energy Policy Act (2005) and agreed upon a "Statement of Consensus Among Parties," which was presented to and accepted by the West Virginia Public Service Commission (PSC) in December 2006. The consensus agreement did include interconnection guidelines for the state, however, the PSC did not initiate a formal rule-making or incorporate the guidelines into agency rules. Rather, the

132

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

General Public/Consumer General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Arkansas Program Type Interconnection Provider Arkansas Public Service Commission In April 2001, Arkansas enacted legislation directing the Arkansas Public Service Commission (PSC) to establish net-metering rules for certain renewable-energy systems. The Arkansas Public Service Commission (PSC) adopted net-metering rules in July 2002 (Order No. 02-046-R). Section 3 applies to the interconnection of net-metered facilities to existing electric power systems.* Systems that generate electricity using solar, wind, hydro, geothermal and biomass resources are eligible to interconnect

133

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bioenergy Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Kansas Program Type Interconnection Provider Kansas Corporation Commission Kansas adopted the Net Metering and Easy Connection Act in May 2009 (see K.S.A. 66-1263 through 66-1271), establishing interconnection guidelines and net metering for customer-owned generators. Net metering and the accompanying interconnection guidelines apply to systems that generate electricity using solar, wind, methane, biomass or hydro resources, and to fuel cells using hydrogen produced by an eligible renewable technology, with a rated capacity of 25 kilowatts (kW) or less for residential customers, 200 kW or less for non-residential customers and 1.5 megawatts

134

GSA-Utility Interconnection Agreements  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception - B-197583, January 19, 1981 GSA - Utility Interconnection Agreements

135

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Louisiana Program Type Interconnection Provider Louisiana Public Service Commission '''''Note: Ongoing proceedings related to net metering can be found in [http://lpscstar.louisiana.gov/star/portal/lpsc/page/Dockets/portal.aspx Docket R-31417.]''''' The Louisiana Public Service Commission (PSC) adopted rules for net metering and interconnection in November 2005. Louisiana's rules, based on those in place in Arkansas, require publicly-owned utilities and rural electric cooperatives to offer net metering to customers with systems that generate electricity using solar, wind, hydropower, geothermal or biomass

136

Interconnection Guidelines (Rhode Island) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Rhode Island Program Type Interconnection Provider Rhode Island Public Utilities Commission Rhode Island enacted legislation (HB 6222) in June 2011 to standardize the application process for the interconnection of customer-sited renewable-energy systems to the state's distribution grid. Rhode Island's interconnection policy is not nearly as comprehensive as

137

EIS-0435: Modification of the Groton Generation Station Interconnection  

Broader source: Energy.gov (indexed) [DOE]

5: Modification of the Groton Generation Station 5: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota EIS-0435: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Summary This EIS evaluates the environmental impacts of a proposal for DOE's Western Area Power Administration to modify its Large Generator Connection Agreement for the Groton Generation Station in Brown County, South Dakota. The modification would allow Basin Electric Power Cooperative, which operates the generation station, to produce power above the current operating limit of 50 average megawatts. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download June 3, 2011 EIS-0435: Final Environmental Impact Statement

138

New Report Characterizes Existing Offshore Wind Grid Interconnection...  

Office of Environmental Management (EM)

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities September 3,...

139

PJM Interconnection (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Interconnection PJM (originally Pennsylvania, Jersey, Maryland) Interconnection is a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. The PJM region has an area of 214,000 square miles, a population of about 60 million and a peak demand of 163,848 megawatts

140

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Wind Program Info State Georgia Program Type Interconnection Provider Georgia Public Service Commission The Georgia Cogeneration and Distributed Generation Act of 2001 allows residential electricity customers with photovoltaic (PV) systems, wind-energy systems or fuel cells up to 10 kilowatts (kW) in capacity, and commercial facilities up to 100 kW, to connect to the grid. The aggregate capacity of distributed generation systems is limited to 0.2% of a utility's system peak demand from the previous year. Interconnected customers must comply with all relevant national standards,

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

System C. Dyadic Green's Functions 1. TM and TE Decomposition 2. Transmission-Line Green's Functions . NUiVIERICAL PROCEDURES . A. Basis functions and testing procedure . 1. Interconnect of Microstrip Lines 2. Slot-Coupled Microstrip Dipole . 3... data of return loss on the 20 GHz slot-coupled rect- angular patch antenna. . FIG URE Pa. ge 28 Typical transmission line section containing a 1A current source. . . 68 CHAPTER I INTRODUCTION Many studies on slot-coupled microstrip antennas have...

Luong, Giam-Minh

2012-06-07T23:59:59.000Z

142

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

143

Transmission Design at the National Level: Benefits, Risks and Possible Paths Forward  

E-Print Network [OSTI]

Electric Energy System #12;Transmission Design at the National Level: Benefits, Risks and Possible Paths of Transmission and Distribution, Southern Company Brad Nickell, Director of Transmission Planning, Western interconnection consisting of one (in the case of ERCOT) or more regions. The ability to move electric energy

144

An empirical study of the economies of scale in AC transmission line construction costs  

E-Print Network [OSTI]

1 An empirical study of the economies of scale in AC transmission line construction costs Krishnan the interconnection (Western, ERCOT, Eastern) in which the transmission was built, and · the capacity of the line. We the change in "Available Transmission Capability" (ATC) [4] between the cases of having the line in and out

Baldick, Ross

145

Puerto Rico - Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Autoridad de Energía Electrica de Puerto Rico In 2007, the Autoridad de Energía Electrica de Puerto Rico (PREPA*) adopted interconnection standards based on the standard contained in the federal Energy Policy Act of 2005. PREPA promulgated interconnection rules in August 2008 that apply to all distributed generation (DG) projects that

146

Distributed PV Interconnection Screening Procedures and Online...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools" 30 mins. Q&Adiscussion Upcoming Meeting: September 24, 2014 Highlights of SunShot Projects: Interconnection as Part of a Strategic Resource Planning Process Alison...

147

Recent Development of SOFC Metallic Interconnect  

SciTech Connect (OSTI)

Interest in solid oxide fuel cells (SOFC) stems from their higher eciencies and lower levels of emitted pollu- tants, compared to traditional power production methods. Interconnects are a critical part in SOFC stacks, which connect cells in series electrically, and also separate air or oxygen at the cathode side from fuel at the anode side. Therefore, the requirements of interconnects are the most demanding, i:e:, to maintain high elec- trical conductivity, good stability in both reducing and oxidizing atmospheres, and close coecient of thermal expansion (CTE) match and good compatibility with other SOFC ceramic components. The paper reviewed the interconnect materials, and coatings for metallic interconnect materials.

Wu JW, Liu XB

2010-04-01T23:59:59.000Z

148

Updating Interconnection Screens for PV System Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Abraham Ellis, Roger Hill Sandia National Laboratories Tom Key, Kristen Nicole, Jeff Smith Electric Power Research Institute Updating Interconnection Screens for PV System...

149

Generation Interconnection and Deliverability Allocation Procedures...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Generation Interconnection and Deliverability Allocation ProceduresLegal Abstract Generation...

150

Durability of Metallic Interconnects and Protective Coatings  

SciTech Connect (OSTI)

To build up a useful voltage, a number of solid oxide fuel cells (SOFCs) are electrically connected into series in a stack via interconnects, which are placed between adjacent cells. In addition to functioning as a bi-polar electrical connector, the interconnect also acts as a separator plate that separates the fuel at the anode side of one cell from the air at the cathode side on an adjacent cell. During SOFC operation at the high temperatures, the interconnects are thus simultaneously exposed to the oxidizing air at one side and a reducing fuel that can be either hydrogen or hydrocarbon at the other. Besides, they are in contact with adjacent components, such as electrodes or electrical contacts, seals, etc. With steady reduction in SOFC operating temperatures into the low or intermediate range 600-850oC, oxidation resistant alloys are often used to construct interconnects. However, the metallic interconnects may degrade via interactions at their interfaces with surrounding environments or adjacent components, potentially affecting the stability and performance of interconnects and the SOFC stacks. Thus protection layers are applied to metallic interconnects that also intend to mitigate or prevent chromium migration into cells and the cell poisoning. This chapter provides a comprehensive review of materials for metallic interconnects, their degradation and coating protection.

Yang, Zhenguo; Stevenson, Jeffry W.

2009-12-15T23:59:59.000Z

151

Updating Technical Screens for PV Interconnection: Preprint  

SciTech Connect (OSTI)

Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlined as possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG. However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnection process. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

Coddington, M.; Ellis, A.; Lynn, K.; Razon, A.; Key, T.; Kroposki, B.; Mather, B.; Hill, R.; Nicole, K.; Smith, J.

2012-08-01T23:59:59.000Z

152

FPGA Interconnect Delay Fault Testing Erik Chmelar  

E-Print Network [OSTI]

A satisfactory FPGA testing method meets several crite- ria. First, the routing resources must be explicitlyFPGA Interconnect Delay Fault Testing Erik Chmelar Center for Reliable Computing Stanford is a scalable manufactur- ing test method for all SRAM-based FPGAs, able to detect multiple interconnect delay

Stanford University

153

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

154

Notices DEPARTMENT OF ENERGY Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

64 Federal Register 64 Federal Register / Vol. 78, No. 224 / Wednesday, November 20, 2013 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement-Interconnection of the Proposed Wilton IV Wind Energy Center Project, North Dakota (DOE/ EIS-0469) AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement and to Conduct a Scoping Meeting; Notice of Floodplain and Wetlands Involvement. SUMMARY: Western Area Power Administration (Western), an agency of the U.S. Department of Energy (DOE), intends to prepare a Supplemental Draft Environmental Impact Statement (SDEIS) for the interconnection of NextEra Energy Resources' proposed

155

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave...  

Broader source: Energy.gov (indexed) [DOE]

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona SUMMARY DOE's...

156

Renewable Generation and Interconnection to the Electrical Grid...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Renewable Generation and Interconnection to the Electrical Grid in Southern California Renewable Generation and Interconnection to the Electrical Grid in Southern California...

157

Power Consumption and Scalability of Optically Switched Interconnects  

Science Journals Connector (OSTI)

We analyzed three realizations of optically switched interconnects regarding power consumption and scalability. The optically switched interconnects provide higher power efficiency...

Fehratovic, Naida; Aleksic, Slavisa

158

New_Contractor_Information_for_Interconnection_Security_Agreement...  

Broader source: Energy.gov (indexed) [DOE]

NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforIntercon...

159

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona SUMMARY DOE's...

160

PJM Interconnection, LLC | Open Energy Information  

Open Energy Info (EERE)

PA References: SGIC1 This article is a stub. You can help OpenEI by expanding it. PJM Interconnection, LLC Smart Grid Project was awarded 13,698,091 Recovery Act Funding...

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Carbon nanotube synthesis for integrated circuit interconnects  

E-Print Network [OSTI]

Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

Nessim, Gilbert Daniel

2009-01-01T23:59:59.000Z

162

Accelerating Fatigue Testing for Cu Ribbon Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation describes fatigue experiments and discusses dynamic mechanical loading for Cu ribbon interconnects.

Bosco, N.; Silverman, T.; Wohlgemuth , J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shioda, T.; Zenkoh, H.; Miyashita, M.; Tadanori, T.; Suzuki, S.

2013-05-01T23:59:59.000Z

163

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

164

Committed regional electrical interconnection projects in the Middle East  

SciTech Connect (OSTI)

Due to the well-known advantages of electrical interconnections and their consequent benefits, Jordan considers the interconnection of its electrical network with the neighboring electrical networks as one of its main corporate strategies. At present the electrical interconnection project of the networks of Egypt, Iraq, Jordan, Syria, and Turkey is progressing. To achieve this interconnection project, two feasibility studies were conducted: interconnection of the Egyptian and Jordanian electrical power systems; interconnection of the electrical networks of Egypt, Iraq, Jordan, Syria, and Turkey (EIJST interconnection). This presentation reviews these studies and their results.

Azzam, M.; Al-Said, A.

1994-12-01T23:59:59.000Z

165

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

166

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

167

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

April 1, 2013 April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region January 23, 2013 CX-009804: Categorical Exclusion Determination Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01/23/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

168

Regulation and investment under uncertainty: An application to power grid interconnection  

E-Print Network [OSTI]

An Application to Power Grid Interconnection. Jean-Danielto the Ontario power grid. This interconnection will allowfor our application to a power grid interconnection. Second,

Saphores, Jean-Daniel M; Gravel, E; Bernard, J T

2004-01-01T23:59:59.000Z

169

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

170

Original Paper Fully interconnected, linear control  

E-Print Network [OSTI]

Original Paper Fully interconnected, linear control for limit cycle walking Joseph H Solomon1 and simple control methodologies for these models (Collins & Ruina, 2005; Hobbelen & Wisse, 2008a, 2008b. Corresponding author: Joseph H. Solomon, Northwestern University, Department of Mechanical Engineering, 2145

Hartmann, Mitra J. Z.

171

Electric network interconnection of Mashreq Arab Countries  

SciTech Connect (OSTI)

Power system interconnection is a well established practice for a variety of technical and economical reasons. Several interconnected networks exist worldwide for a number of factors. Some of these networks cross international boundaries. This presentation discusses the future developments of the power systems of Mashreq Arab Countries (MAC). MAC consists of Bahrain, Egypt, Iraq, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, United Arab Emirates (UAE), and Yemen. Mac power systems are operated by government or semigovernment bodies. Many of these countries have national or regional electric grids but are generally isolated from each other. With the exception of Saudi Arabia power systems, which employ 60 Hz, all other MAC utilities use 50 Hz frequency. Each country is served by one utility, except Saudi Arabia, which is served by four major utilities and some smaller utilities serving remote towns and small load centers. The major utilities are the Saudi Consolidated electric Company in the Eastern Province (SCECO East), SCECO Center, SCECO West, and SCECO South. These are the ones considered in this study. The energy resources in MAC are varied. Countries such as Egypt, Iraq, and Syria have significant hydro resources.The gulf countries and Iraq have abundant fossil fuel, The variation in energy resources as well as the characteristics of the electric load make it essential to look into interconnections beyond the national boundaries. Most of the existing or planned interconnections involve few power systems. A study involving 12 countries and over 20 utilities with different characteristics represents a very large scale undertaking.

El-Amin, I.M.; Al-Shehri, A.M.; Opoku, G.; Al-Baiyat, S.A.; Zedan, F.M.

1994-12-01T23:59:59.000Z

172

Secretary Moniz to Discuss Western Energy Landscape at Western...  

Energy Savers [EERE]

Discuss Western Energy Landscape at Western Governors' Association Annual Meeting Secretary Moniz to Discuss Western Energy Landscape at Western Governors' Association Annual...

173

Western Wind and Solar Integration Study Phase 3 -- Frequency Response and Transient Stability (Report and Executive Summary)  

SciTech Connect (OSTI)

The primary objectives of Phase 3 of the Western Wind and Solar Integration Study (WWSIS-3) were to examine the large-scale transient stability and frequency response of the Western Interconnection with high wind and solar penetration, and to identify means to mitigate any adverse performance impacts via transmission reinforcements, storage, advanced control capabilities, or other alternatives.

Miller, N. W.; Shao, M.; Pajic, S.; D'Aquila, R.

2014-12-01T23:59:59.000Z

174

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Broader source: Energy.gov (indexed) [DOE]

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

175

seca-core-tech-sofc-interconnect | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Developmental SOFC Interconnect Alloys PDF-1.2MB - M.P. Brady, B.A. Pint, T.R. Armstrong Products Bulk Alloy Breakout Team PDF-92KB Interconnect-Electrode Interface...

176

Fast high-order variation-aware IC interconnect analysis  

E-Print Network [OSTI]

Interconnects constitute a dominant source of circuit delay for modern chip designs. The variations of critical dimensions in modern VLSI technologies lead to variability in interconnect performance that must be fully accounted for in timing...

Ye, Xiaoji

2009-05-15T23:59:59.000Z

177

National Offshore Wind Energy Grid Interconnection Study (NOWEGIS)  

Broader source: Energy.gov [DOE]

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States.

178

High temperature solid electrolyte fuel cell configurations and interconnections  

DOE Patents [OSTI]

High temperature fuel cell configurations and interconnections are made including annular cells having a solid electrolyte sandwiched between thin film electrodes. The cells are electrically interconnected along an elongated axial outer surface.

Isenberg, Arnold O. (Forest Hills, PA)

1984-01-01T23:59:59.000Z

179

Solar Energy to Benefit from New FERC Interconnection Procedures...  

Energy Savers [EERE]

Solar Energy to Benefit from New FERC Interconnection Procedures Solar Energy to Benefit from New FERC Interconnection Procedures October 30, 2014 - 5:15pm Addthis As a major win...

180

Voltage Collapse SimulationVoltage Collapse Simulation (Eastern Interconnection(Eastern Interconnection  

E-Print Network [OSTI]

of 2003 that is available on the PSERC web site, http://pserc.org. 2 #12;Symbols in the Simulation Window · Buses: heavy dark lines where the generators, loads and transmission lines interconnect · Transmission

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Instructions  

Broader source: Energy.gov (indexed) [DOE]

11 11 Transmission Planning in the ERCOT Interconnection Warren Lasher Manager, Long-Term Planning and Policy Department of Energy Electricity Advisory Committee 2 October 20, 2011 The ERCOT Region is one of 3 NERC grid interconnections. The ERCOT grid has: * 75% of Texas land * 85% of Texas load * 40,500 miles of transmission lines * 550+ generation units * 68,294 MW peak demand (set 8/3/2011) 1,106 MW of Asynchronous Tie Capacity (820 MW with Eastern Interconnection) 2,877 MW of generation can switch between ERCOT and the Eastern interconnection The ERCOT Interconnection 3 October 20, 2011 The ERCOT wholesale generation market is an "energy-only" market ERCOT administers day-ahead and real- time markets for energy and ancillary services

182

Electrically long vertical interconnects for microwave circuits and antennas  

E-Print Network [OSTI]

. . . . . 2 . . . . 3 . . . . 4 . 4 . 4 . 5 . . . . 5 . . . . 6 . . . . 7 A. Transmission Line Interconnects. . B. Electromagnetically Coupled lnterconnects . . . . . C. Conclusions . . . . . . 8 . . . 10 III FIDELITY SIMULATION 12 A. B. C. D... interconnects satisfying specifications set by Raytheon Systems Co. This research was sponsored by Raytheon Systems Co. RF/Microwave Division. A vertical interconnect couples transmission lines, antennas, and components between vertically spaced layers...

Coutant, Matthew Richard

2012-06-07T23:59:59.000Z

183

Western Meter Policy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WESTERN AREA POWER ADMINISTRATION Meter Policy November 22, 2013 Western Area Power Administration Meter Policy Version: Final 11222013 2 | P a g e Table of Contents 1. Purpose...

184

Interconnection Standards for Small Generators | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards for Small Generators Interconnection Standards for Small Generators Interconnection Standards for Small Generators < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) adopted "small generator" interconnection standards for distributed energy resources up to 20 megawatts (MW) in capacity in May 2005.* The FERC's standards apply only to facilities subject to the jurisdiction of the commission; these facilities

185

Eastern Interconnection Planning Collaborative News Release  

Broader source: Energy.gov (indexed) [DOE]

1 1 NEWS RELEASE FOR IMMEDIATE RELEASE May 23, 2011 Contact: David Whiteley d.a.whiteley@att.net 314-753-6200 Eastern Interconnection Grid Planning Authorities to Study Set of Stakeholder-Identified Electric System Futures The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a major step forward with the stakeholder-defined specifications for the resource futures to be considered in the macroeconomic analysis in Phase I of the Project. The stakeholders are to be congratulated for their hard work in achieving a

186

Frequency Instability Problems in North American Interconnections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Frequency Instability Problems in Frequency Instability Problems in North American Interconnections May 1, 2011 DOE/NETL-2011/1473 Frequency Instability Problems in North American Interconnections Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

187

Interconnection of bundled solid oxide fuel cells  

DOE Patents [OSTI]

A system and method for electrically interconnecting a plurality of fuel cells to provide dense packing of the fuel cells. Each one of the plurality of fuel cells has a plurality of discrete electrical connection points along an outer surface. Electrical connections are made directly between the discrete electrical connection points of adjacent fuel cells so that the fuel cells can be packed more densely. Fuel cells have at least one outer electrode and at least one discrete interconnection to an inner electrode, wherein the outer electrode is one of a cathode and and anode and wherein the inner electrode is the other of the cathode and the anode. In tubular solid oxide fuel cells the discrete electrical connection points are spaced along the length of the fuel cell.

Brown, Michael; Bessette, II, Norman F; Litka, Anthony F; Schmidt, Douglas S

2014-01-14T23:59:59.000Z

188

Definition: Interconnection Reliability Operating Limit Tv | Open Energy  

Open Energy Info (EERE)

Limit Tv Limit Tv Jump to: navigation, search Dictionary.png Interconnection Reliability Operating Limit Tv The maximum time that an Interconnection Reliability Operating Limit can be violated before the risk to the interconnection or other Reliability Coordinator Area(s) becomes greater than acceptable. Each Interconnection Reliability Operating Limit's Tv shall be less than or equal to 30 minutes.[1] Related Terms Interconnection Reliability Operating Limitinterconnection, interconnection References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interconnection_Reliability_Operating_Limit_Tv&oldid=493031

189

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie

190

Performance testing of small interconnected wind systems  

SciTech Connect (OSTI)

There is a need for performance information on small windmills intended for interconnected operation with utility distribution service. The owner or prospective buyer needs the data to estimate economic viability and service reliability, while the utility needs it to determine interconnection arrangements, maintain quality of power delivered by its line, and to answer customer inquiries. No existing testing program provides all the information needed, although the Rocky Flats test site comes close. To fill this need for Michigan, Consumers Power Company and the Michigan Electric Cooperative Association helped support a two-year program at Michigan State University involving extensive performance testing of an Enertech 1500 and a 4-kW Dakota with a Gemini inverter. The performance study suggested measurements necessary to characterize SWECS for interconnected operation. They include SWECS energy output to a-c line, miles of wind passing the rotor, var-hour metering for average var consumption, and recording watt, current, and voltmeters to assess SWECS output variability. Added instruments for waveform measurement (to assess power quality) are also needed. Typical data taken at the MSU test site are used to illustrate the techniques and preliminary data from a current project is given. Finally, conclusions about SWECS performance are listed.

Park, G.L.; Krauss, O.; Miller, J.

1984-05-01T23:59:59.000Z

191

Updating Interconnection Screens for PV System Integration  

SciTech Connect (OSTI)

This white paper evaluates the origins and usefulness of the capacity penetration screen, offer short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen. Short-term and longer-term alternatives approaches are offered as examples; however, specific modifications to screening procedures should be discussed with stakeholders and must ultimately be adopted by state and federal regulatory bodies.

Coddington, M.; Mather, B.; Kroposki, B.; Lynn, K.; Razon, A.; Ellis, A.; Hill, R.; Key, T.; Nicole, K.; Smith, J.

2012-02-01T23:59:59.000Z

192

Repairable chip bonding/interconnect process  

DOE Patents [OSTI]

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

1997-01-01T23:59:59.000Z

193

Topic B Awardee: Eastern Interconnection States' Planning Council |  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection States' Eastern Interconnection States' Planning Council Topic B Awardee: Eastern Interconnection States' Planning Council The Eastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the American Recovery and Reinvestment Act (ARRA). The goal is to create an unprecedented collaborative among the states in the Eastern Interconnection. Comprised of public utility commissions, Governors' offices, energy offices, and other key government representatives, this collaboration will foster and produce consistent and coordinated direction to the regional and interconnection-level analyses and planning. Significant state input and direction increases the probability that the outputs will be useful to the

194

Recovery Act Interconnection Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

195

Flip chip electrical interconnection by selective electroplating and bonding  

E-Print Network [OSTI]

on a glass substrate made of 500/2000 A° of Cr/Au with 3150 lm in length and 10 lm in width. Two silicon. The interconnection chip has 102 Cr/Au interconnection lines with 3150 lm in length and 10 lm in width. The bonding pads on the ends of the interconnection lines are 40 lm by 40 lm. A 0.8 lm thick layer of aluminum

Lin, Liwei

196

Western Area Power Administration Draft Finding of No Significant Impact East Altamont Energy Center, Alameda County, California  

Broader source: Energy.gov (indexed) [DOE]

DOE/EA-1411 DEPARTMENT OF ENERGY Western Area Power Administration Draft Finding of No Significant Impact East Altamont Energy Center, Alameda County, California Summary: East Altamont Energy Center, LLC (EAEC LLC), a wholly owned subsidiary of Calpine Corporation applied to the Department of Energy (DOE), Western Area Power Administration (Western) to interconnect the East Altamont Energy Center (EAEC), a 1100-megawatt (MW) natural gas-fired power plant, to Western's Tracy Substation. EAEC LLC intends to serve competitive regional markets in California with power from the EAEC. Western proposes to make modifications at its Tracy Substation to accommodate the interconnection. The EAEC is a merchant plant which means that it would be independent of other generators and that the power generated would serve

197

WINDERMERE RD WesternRoadWesternRoad  

E-Print Network [OSTI]

WINDERMERE RD N 2 210 Kilometres 186 189 194 WesternRoadWesternRoad Oxford Street Oxford Street 2 2 Street (9 kms) · Turn left (west) onto Oxford Street and follow to Wharncliffe Road (4 kms) · Turn right (north) onto Wharncliffe Road and follow to the fifth set of traffic lights · Turn left (west

Sinnamon, Gordon J.

198

Western Pacific Regional Summary Western Pacific  

E-Print Network [OSTI]

) of the Pacific-wide (western-central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported Fisheries Commission (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview

199

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

200

Community Wind Handbook/Research Interconnecting behind Your...  

Open Energy Info (EERE)

your local utility. Most utilities and other electricity providers require you to enter into a formal agreement with them before you are allowed to interconnect your wind...

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Response from PJM Interconnection LLC and Pepco to Department...  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM...

202

Pepco and PJM Interconnection Comments on District of Columbia...  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM...

203

CHP: Connecting the Gap between Markets and Utility Interconnection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Markets and Utility Interconnection and Tariff Practices, 2006 The adoption of combined heat and power (CHP) systems by American industries has made substantial strides in the...

204

Physics of Failure of Electrical Interconnects | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies Program Annual Merit Review and Peer Evaluation ape036devoto2011p.pdf More Documents & Publications Physics of Failure of Electrical Interconnects Reliability...

205

Proposed rule for Interconnection for Wind Energy and Other Alternativ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REGULATORY COMMISSION 18 CFR Part 35 (Docket No. RM05-4-000) Interconnection for Wind Energy and Other Alternative Technologies (January 24, 2005) AGENCY: Federal Energy...

206

RAPID/Geothermal/Transmission Siting & Interconnection/Montana...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionMontana) Jump to: navigation, search RAPID Regulatory and Permitting...

207

RAPID/Geothermal/Transmission Siting & Interconnection/Hawaii...  

Open Energy Info (EERE)

Utilities Commission to interconnect a proposed renewable energy project to the existing grid. Transmission Siting Threshold: No threshold provided Public Utility Definition for...

208

RAPID/Geothermal/Transmission Siting & Interconnection/Utah ...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionUtah) Jump to: navigation, search RAPID Regulatory and Permitting...

209

RAPID/Geothermal/Transmission Siting & Interconnection/Oregon...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionOregon) Jump to: navigation, search RAPID Regulatory and Permitting...

210

U.S. Army Fort Carson Interconnection Agreement  

Broader source: Energy.gov [DOE]

Document describes a sample interconnection agreement for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA).

211

Modelling of interconnects including coaxial cables and multiconductor lines.  

E-Print Network [OSTI]

??In recent years, electromagnetic compatibility (EMC) problems associated with high frequency and high speed interconnects are becoming of increasing concern. Coaxial cables are a popular (more)

Teo, Yu Xian

2013-01-01T23:59:59.000Z

212

National Offshore Wind Energy Grid Interconnection Study  

SciTech Connect (OSTI)

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States. A total of 54GW of offshore wind was assumed to be the target for the analyses conducted. A variety of issues are considered including: the anticipated staging of offshore wind; the offshore wind resource availability; offshore wind energy power production profiles; offshore wind variability; present and potential technologies for collection and delivery of offshore wind energy to the onshore grid; potential impacts to existing utility systems most likely to receive large amounts of offshore wind; and regulatory influences on offshore wind development. The technologies considered the reliability of various high-voltage ac (HVAC) and high-voltage dc (HVDC) technology options and configurations. The utility system impacts of GW-scale integration of offshore wind are considered from an operational steady-state perspective and from a regional and national production cost perspective.

Daniel, John P. [ABB Inc; Liu, Shu [ABB Inc; Ibanez, Eduardo [National Renewable Energy Laboratory; Pennock, Ken [AWS Truepower; Reed, Greg [University of Pittsburgh; Hanes, Spencer [Duke Energy

2014-07-30T23:59:59.000Z

213

The Design and Tests in a Three Interconnected Fluidized Bed  

Science Journals Connector (OSTI)

Hydrogen production based on chemical looping combustion can obtain clean hydrogen with near zero emission of carbon dioxide. This technique can be auto-thermal, making it very promising for hydrogen production. In this paper, the interconnected fluidized ... Keywords: chemical looping combustion, hydrogen production Interconnected fluidized beds

Junjiao Zhang; Jingzhou Jiang; Qiang Lu; Changqing Dong; Teng Zhang; Xinglei Liu; Zhiyong Liang; Yongping Yang

2010-12-01T23:59:59.000Z

214

A Scalable Interconnection Network Architecture for Petaflops Computing  

Science Journals Connector (OSTI)

Extrapolating technology advances in the near future, a computer architecture capable of petaflops performance will likely be based on a collection of processing nodes interconnected by a high-performance network. One possible organization would consist ... Keywords: computer architecture, interconnection networks, performance analysis, petaflops computing

Constantine Katsinis; Bahram Nabet

2004-02-01T23:59:59.000Z

215

Mathematical models of interconnections between composition and properties of oils in the Apsheron oil-and gas-bearing region of Azerbaijan  

SciTech Connect (OSTI)

This paper reports on the example of oils in the Apsheron oil- and gas-bearing region and Apsheron archipelago located in the western part of the Southern Caspian depression, of which the authors have developed mathematical models of a group hydrocarbon composition; interconnection between oil density and content of asphalt-resin materials, benzine, and ligroin; interconnections between oil density and viscosity and temperature; and interconnections between content of asphalt-resin properties and low-temperature fractions. The models obtained enable us to extrapolate factual data on composition and properties of oils beyond the limits of fixed depths of burial of oil-saturated reservoirs both to a zone of great depths and increased temperatures where hydrocarbons were in a gaseous or oil and gaseous state, and to a zone of near-surface conditions where oils acquire the consistency of asphalts.

Buryakovsky, L.A.; Dzhevanshir, R.D. (Inst. of Deep Oil and Gas Deposits, Azerbaijan Academy of Sciences, 33 Narimanov Prospect, Baku 370143, Azerbaijan (SU))

1992-01-01T23:59:59.000Z

216

Pepco and PJM Interconnection Comments on District of Columbia Public  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the Department of Energy on February 17, 2006. Potomac Electric Power Company and PJM Interconnection, L.L.C. jointly submit these comments and answer to the requests for rehearing submitted by the City of Alexandria, Virginia and the Director of the Virginia Department of Environmental Quality in the captioned proceeding . Pepco and PJM Interconnection Comments on District of Columbia Public

217

A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth to Enable Latency Reduction  

E-Print Network [OSTI]

D R A FT 1 A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth optoelectronic interconnection network router capable of supplying and efficiently utilizing higher bandwidth routing, interconnection network, latency hiding/reduction techniques, optoelectronic router. 1

Pinkston, Timothy M.

218

Trinity Public Utilities District Direct Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement DOE/EIS-0395 JULY 2007 COVER SHEET LEAD FEDERAL AGENCIES: U.S. Department of Energy (DOE), Western Area Power Administration (Western), and Office of Electricity Delivery and Energy Reliability (OE) COOPERATING AGENCIES: U.S. Department of the Navy (Navy), U.S. Bureau of Reclamation (Reclamation), U.S. Bureau of Land Management (BLM), City of Yuma TITLE: San Luis Rio Colorado Project Final Environmental Impact Statement, DOE/EIS-0395 LOCATION: Yuma County, Arizona CONTACT: For additional information on DOE National Environmental Policy Act (NEPA) activities, please contact Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance, GC-20, U.S. Department of Energy, 1000 Independence Avenue S.W., Washington D.C. 20585, phone: 1-800-472-2756 or visit the

219

Perspectives on Real-Time Grid Operating Technologies to Manage Reliability in the Western Interconnection  

E-Print Network [OSTI]

Real-Time Grid Operating Technologies to Manage ReliabilityEto Environmental Energy Technologies Division October 2013Real-Time Grid Operating Technologies to Manage Reliability

Whitley, Eric

2014-01-01T23:59:59.000Z

220

Market Characteristics for Efficient Integration of Variable Generation in the Western Interconnection  

SciTech Connect (OSTI)

The overriding purpose of this report is to establish the physical requirements of a power system that can accommodate high levels of variable generation.

Milligan, M.; Kirby, B.

2010-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Investigating the Correlation Between Wind and Solar Power Forecast Errors in the Western Interconnection: Preprint  

SciTech Connect (OSTI)

Wind and solar power generations differ from conventional energy generation because of the variable and uncertain nature of their power output. This variability and uncertainty can have significant impacts on grid operations. Thus, short-term forecasting of wind and solar generation is uniquely helpful for power system operations to balance supply and demand in an electricity system. This paper investigates the correlation between wind and solar power forecasting errors.

Zhang, J.; Hodge, B. M.; Florita, A.

2013-05-01T23:59:59.000Z

222

E-Print Network 3.0 - attach interconnection technology Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Barbara; NONE Collection: Biology and Medicine ; Engineering 7 Call for Papers Optoelectronic Interconnects XII (OE113) Summary: interconnect technologies ultra-short reach...

223

Western Renewable Energy Zones-Phase 1 Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Western Renewable Energy Zones-Phase 1 Report Western Renewable Energy Zones-Phase 1 Report Western Renewable Energy Zones-Phase 1 Report In June 2006, the Western Governors'Association published "Clean Energy, a Strong Economy and a Healthy Environment,"a report from the Clean and Diversified Energy Advisory Committee.3 This report explained that while vast renewable resources exist throughout the West,many reside in remote areas without ready or cost effective access to transmission. Lack of cost effective transmission access was, and remains, the greatest impediment to the rapid development of utility-scale, renewable-rich resource areas. Western Renewable Energy Zones-Phase 1 Report More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

224

USLCI Interconnect Region Electricity datasets, 2008 | OpenEI  

Open Energy Info (EERE)

76 76 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278976 Varnish cache server USLCI Interconnect Region Electricity datasets, 2008 Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included.Datasets include generation and transmission of electricity for each of the interconnect regions. It is representative of the year 2008 mix of fuels used for utility generations for each of the interconnect regions and is based on the EIA electricity reports for all power plants in the US. Detailed information on the methodology is included in the module report and detailed spreadsheet.

225

PARS II New Contractor Information for Interconnection Security Agreement  

Broader source: Energy.gov (indexed) [DOE]

New Contractor Information for Interconnection Security Agreement New Contractor Information for Interconnection Security Agreement V1.0 (November 18, 2010) The Department of Energy (DOE) Headquarters Program Cyber Security Plan (PCSP), dated February 2008, requires the Project Assessment and Reporting System (PARS) II System Owner and the contractor sign an Interconnection Security Agreement (ISA). The requirement for an Interconnection Security Agreement can be found on page 182 of the PCSP. The ISA template is available for review on the PARS II portal (http://management.energy.gov/online_resources/pars2.htm) under Contractor Documents. Before the contractor begins sending data to PARS II, DOE will send the ISA to the contractor for review and signature. In order to prepare the ISA for review and signature, the PARS II Support Team needs

226

Interconnecting PV on NYC's Secondary Network Distribution System  

Broader source: Energy.gov [DOE]

To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report.

227

Photovoltaic Systems Interconnected onto Secondary Network Distribution Systems Success Stories  

Broader source: Energy.gov [DOE]

This report examines six case studies of photovoltaic (PV) systems integrated into secondary network systems. The six PV systems were chosen for evaluation because they are interconnected to secondary network systems located in four major Solar America Cities.

228

An optical data receiver for integrated photonic interconnects  

E-Print Network [OSTI]

The throughput bounds of traditional interconnect networks in microprocessors are being pushed to their limits. In past single-core processors, the number of long global wires constituted only a small fraction of the total. ...

Georgas, Michael S. (Michael Stephen)

2009-01-01T23:59:59.000Z

229

Evaluation of phase change materials for reconfigurable interconnects  

E-Print Network [OSTI]

The possible use of programmable integrated circuit interconnect vias using an indirectly heated phase change material is evaluated. Process development and materials investigations are examined. Devices capable of multiple ...

Khoo, Chee Ying

2010-01-01T23:59:59.000Z

230

Microsoft Word - CX-Hardeson_Interconnection_23Sept2013.doc  

Broader source: Energy.gov (indexed) [DOE]

request. The proposed point of interconnection is at SnoPUD's existing Hardeson Substation. In order to integrate the proposed generation, BPA and SnoPUD would enter into...

231

Chemical looping combustion of coal in interconnected fluidized beds  

Science Journals Connector (OSTI)

Chemical looping combustion is the indirect combustion by use of oxygen carrier. It can...2...capture in power generating processes. In this paper, chemical looping combustion of coal in interconnected fluidized ...

LaiHong Shen; Min Zheng; Jun Xiao; Hui Zhang

2007-04-01T23:59:59.000Z

232

Perspectives on the metallic interconnects for solid oxide fuel cells  

Science Journals Connector (OSTI)

The various stages and progress in the development of interconnect materials for solid oxide fuel cells (SOFCs) over the last two decades are reviewed. The criteria for the application of materials as intercon...

Wei-zhong Zhu; Mi Yan

2004-12-01T23:59:59.000Z

233

5 F 13 Optica1 Interconnection T ransmitter Power BER  

E-Print Network [OSTI]

¼ 5¸ ¤ ü ? ø Ð Ð ú ¸ ? í ® F? 13 Optica1 Interconnection? T ransmitter Power Í BER? ? û - ¡ ü ?

Choi, Woo-Young

234

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities  

Broader source: Energy.gov [DOE]

The Energy Department today released the first National Offshore Wind Energy Grid Interconnection Study that investigated the key economic and technological factors that will influence the integration of offshore wind energy onto the national grid.

235

Interconnect modeling and optimization in deep sub-micron technologies  

E-Print Network [OSTI]

Interconnect will be a major bottleneck for deep sub-micron technologies in the years to come. This dissertation addresses the communication aspect from a power consumption and transmission speed perspective. A model for ...

Sotiriadis, Paul Peter P. (Paul Peter Peter-Paul), 1973-

2002-01-01T23:59:59.000Z

236

Accelerating Communication in On-Chip Interconnection Networks  

E-Print Network [OSTI]

. In this dissertation, several schemes are proposed to accelerate communication in on-chip interconnection networks within area and cost budgets to overcome the problems. First, an early transition scheme for fully adaptive routing algorithms is proposed to improve...

Ahn, Minseon

2012-07-16T23:59:59.000Z

237

Design and analysis of high performance multistage interconnection networks  

E-Print Network [OSTI]

an analytical model to compare its performance with the existing designs reported in the literature. We validate on model with extensive simulation studies. Index Terms - Multistage interconnection networks, packet switching, static buffer allocation, dynamic...

Bhogavilli, Suresh K

2012-06-07T23:59:59.000Z

238

Topic B Awardee: Eastern Interconnection States' Planning Council  

Broader source: Energy.gov [DOE]

TheEastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the...

239

Western Pacific Regional Summary Western Pacific  

E-Print Network [OSTI]

-central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported in 2007. Currently (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC

240

Western Pacific Regional Summary Western Pacific  

E-Print Network [OSTI]

Pacific Ocean) total of Pacific bigeye tuna landings reported in 2007. Currently, there are no catch share in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC migrate across international

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid  

SciTech Connect (OSTI)

The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.

Kou, Gefei [ORNL; Hadley, Stanton W [ORNL; Markham, Penn N [ORNL; Liu, Yilu [ORNL

2013-12-01T23:59:59.000Z

242

Western Renewable Energy Zones, Phase 1: QRA Identification Technical Report  

SciTech Connect (OSTI)

This report describes the Western Renewable Energy Zones (WREZ) Initiative Phase 1 Qualified Resource Area identification process, including the identification and economic analysis of Qualified Resource Areas (QRAs) and 'non-REZ' resources. These data and analyses will assist the Western US in its renewable energy transmission planning goals. The economic analysis in this report produced the input data for the WREZ Generation and Transmission model, which is a screening-level model to determine the optimal routing for and cost of delivering renewable energy from QRAs to load centers throughout the Western Interconnection. In June 2009, the Western Governors' Association accepted the Western Governors' Association WREZ Phase 1 Report in which the QRAs were mapped and the entire WREZ Phase 1 process was explained in general. That same month the Lawrence Berkeley National Laboratory released the WREZ Generation and Transmission Model (GTM), which was also developed by Black & Veatch. This report details the assumptions and methodologies that were used to produce the maps and resource analyses in the WGA report as well as the economic data used by the WREZ GTM. This report also provides the results of the non-REZ resource analysis for the first time in the WREZ initiative.

Pletka, R.; Finn, J.

2009-10-01T23:59:59.000Z

243

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Loveland Area Projects November 29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development of the 2025 PMI Proposal * 2025 PMI Proposal * 2025 PMI Comment Period & Proposal Information * Questions 3 Overview of Western Area Power Administration (Western) * One of four power marketing administrations within the Department of Energy * Mission: Market and deliver reliable, renewable, cost-based Federal hydroelectric power and related services within a 15-state region of the central and western U.S. * Vision: Provide premier power marketing and transmission services Rocky Mountain Region (RMR) is one of five regional offices 4 Rocky Mountain Region

244

Western Chemical Information  

Science Journals Connector (OSTI)

Western Chemical Information ... For the most part, the units are small because production is geared to the needs of the 11 states, Washington, Oregon, California, Idaho, Nevada, Montana, Wyoming, Colorado, Utah, New Mexico, and Arizona, not to the entire country. ...

FREDERICK G. SAWYER

1949-10-17T23:59:59.000Z

245

Western Renewable Energy Generation Information System | Open Energy  

Open Energy Info (EERE)

Information System Information System Jump to: navigation, search Name Western Renewable Energy Generation Information System Place Sacramento, California Zip 95814-5504 Sector Renewable Energy Product WREGIS tracks renewable energy certificates throughout the Western Interconnection. Coordinates 38.579065°, -121.491014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.579065,"lon":-121.491014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

246

Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Western Area Power Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

247

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

2 Key Calendar Dates in Colorado's Compact Apportionments 5 #12;1 Western Water AssessmentWESTERN WATER ASSESSMENT WHITE PAPER The Effect of Changing Hydrographs on Compact Apportionments in the Western United States: A Preliminary Analysis of Potential Trouble-Spots Western Water Assessment Working

Neff, Jason

248

Western Regional Partnership Overview  

Broader source: Energy.gov (indexed) [DOE]

Regional Partnership Overview Regional Partnership Overview June 2013 Briefing Overview  WRP Background  Importance of Region  WRP Tribal Relations Committee  WRP Energy Committee WRP Region's Uniqueness  5 states stretching from the Great Plains to the Pacific Ocean  Diverse terrain ranging from desert valleys to forested mountains  Significant State Trust Landholdings  Approximately 188 Federally recognized Tribes  Significant amounts of Federally managed land  According to GSA 2004 study, WRP states range from 41.8% - 84.5% of total state land WRP Region's Importance to DoD  Extensive Training Ranges  Interconnected ground/air ranges provide unmatched warfighter training opportunities

249

EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

34: Hualapai Valley Solar Interconnection Project, Arizona 34: Hualapai Valley Solar Interconnection Project, Arizona EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona Overview Hualapai Valley Solar, LLC, proposes to construct, operate and maintain a 340-megawatt, solar-powered generating facility in Mohave County, near Kingman, Ariz. The proposed project would use concentrating solar-power-trough technology to capture the sun's heat to make steam, which would power a traditional steam turbine generator. Proposed infrastructure would consist of a solar field, power block, thermal energy storage system, substation site, transmission line, temporary laydown areas and other ancillary facilities. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

250

Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrodeposited Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects H. McCrabb * , T. Hall * , J. Wu # , H. Zhang # , X. Liu # , E.J. Taylor * * Faraday Technology Inc., 315 Huls Dr., Clayton, OH 45315, USA # West Virginia University, Dept. of Mechanical and Aerospace Eng.ESB, Morgantown, WV, 26506, USA Overall Objective Overall Objective Principal Investigator: Heather McCrabb, Company Name: Faraday Technology, Inc., Address: 315 Huls Drive, Clayton, OH 45315, Phone: 937-836-7749, E-mail: heathermccrabb@faradaytechnology.com, Company website: faradaytechnology.com Previous Work at WVU Results Develop an inexpensive manufacturing process for depositing (Mn,Co) 3 O 4 spinel coatings onto SOFC interconnects. Introduction The decrease in the SOFC operating temperatures from 1000°C to between 650 and 850°C has enabled the use of chromia-forming ferritic stainless steels as interconnects

251

Renewable Energy Interconnection and Storage - Technical Aspects | Open  

Open Energy Info (EERE)

Renewable Energy Interconnection and Storage - Technical Aspects Renewable Energy Interconnection and Storage - Technical Aspects Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Renewable_Energy_Interconnection_and_Storage_-_Technical_Aspects&oldid=514543"

252

Graphene interconnects fully encapsulated in layered insulator hexagonal boron nitride  

Science Journals Connector (OSTI)

We demonstrate improvements in the electrical performance of graphene interconnects with full encapsulation by lattice-matching layered insulator, hexagonal boron nitride (h-BN). A novel layer-based transfer method is developed to assemble the top passivating layer of h-BN on the graphene surface to construct the h-BN/graphene/h-BN heterostructures. The encapsulated graphene interconnects (EGIs) are characterized and compared with graphene interconnects on either SiO2 or h-BN substrates with no top passivating h-BN layer. We observe significant improvements in both the maximum current density and breakdown voltage in EGIs. Compared with the uncovered structures, EGIs also show an appreciable increase (~67%) in power density at breakdown. These improvements are achieved without degrading the carrier transport characteristics in graphene wires. In addition, EGIs exhibit a minimal environment impact, showing electrical behavior insensitive to ambient conditions.

Nikhil Jain; Chris A Durcan; Robin Jacobs-Gedrim; Yang Xu; Bin Yu

2013-01-01T23:59:59.000Z

253

National Electric Transmission Congestion Study 2006 Eastern Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Memorandum To: Poonum Agrawal, David Meyer, U.S. Department of Energy CRA No. D08554-00 From: Prashant Murti, Alex Rudkevich, CRA International Date: Finalized March 13, 2006 Subject: GE MAPS INPUT ASSUMPTIONS: EASTERN INTERCONNECT This memorandum summarizes salient inputs to the CRA locational price forecasting model (GE MAPS). The model geographic footprint encompasses the US portion of the Eastern Interconnect and the Canadian province of Ontario. The analyses simulate the years 2008 and 2011. Primary data sources for the CRA GE MAPS model include the NERC MMWG, the General Electric generation and transmission databases for the Eastern Interconnect, various publications by NERC regions and Independent System Operators, FERC submissions by generation and transmission owners,

254

High-temperature quenching of electrical resistance in graphene interconnects  

E-Print Network [OSTI]

into the chip interconnect design the materials with low electrical resistance and high thermal con- ductivity dependence of the resistance were explained by the thermal generation of the electron-hole pairs and carrier, increased total thermal boundary resistance of the chip layers, incorporation of the alternative dielectric

255

STABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS  

E-Print Network [OSTI]

, with energy imbalance in the physical system, with or without network congestion, driving the market responseSTABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS F.L. Alvarado1 J University of Paraiba, Brazil Abstract: The use of market mechanisms to determine gen- eration dispatch

256

Energy and Reliability in Future NOC Interconnected CMPS  

E-Print Network [OSTI]

In this dissertation, I explore energy and reliability in future NoC (Network-on-Chip) interconnected CMPs (chip multiprocessors) as they have become a first-order constraint in future CMP design. In the first part, we target the root cause...

Kim, Hyungjun

2013-08-01T23:59:59.000Z

257

Solar Energy to Benefit from New FERC Interconnection Procedures  

Office of Energy Efficiency and Renewable Energy (EERE)

As a major win for solar and testament to the impact of Department of Energys SunShot Initiative funded research at the national labs, this past month Federal Energy Regulatory Commission announced the adoption of new fast track rules to make the interconnection process dramatically cheaper and faster for small wholesale energy projects, representing a major improvement with nationwide impacts.

258

Hermetic aluminum radio frequency interconnection and method for making  

DOE Patents [OSTI]

The present invention provides a light-weight, hermetic coaxial radio-frequency (RF) interconnection having an electrically conductive outer housing made of aluminum or an aluminum alloy, a central electrical conductor made of ferrous or non-ferrous material, and a cylinder of dielectric material comprising a low-melting-temperature, high-thermal-expansion aluminophosphate glass composition for hermetically sealing between the aluminum-alloy outer housing and the ferrous or non-ferrous center conductor. The entire RF interconnection assembly is made permanently hermetic by thermally fusing the center conductor, glass, and housing concurrently by bringing the glass to the melt point by way of exposure to an atmospheric temperature sufficient to melt the glass, less than 540.degree. C., but that does not melt the center conductor or the outer aluminum or aluminum alloy housing. The composition of the glass used is controlled to provide a suitable low dielectric constant so that an appropriate electrical characteristic impedance, for example 50 ohms, can be achieved for an electrical interconnection that performs well at high radio frequencies and also provides an interconnection maintaining a relatively small physical size.

Kilgo, Riley D. (Albuquerque, NM); Kovacic, Larry (Albuquerque, NM); Brow, Richard K. (Rolla, MO)

2000-01-01T23:59:59.000Z

259

Optimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects  

E-Print Network [OSTI]

tapering is shown to reduce the (a CMOS inverter) with the driver (a CMOS inverter). The power dissipatedOptimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects Magdy A. El-Moursy and Eby G. Friedman Department of Electrical and Computer Engineering University of Rochester Rochester, New

Friedman, Eby G.

260

Lumped Electro-Thermal Model of On-chip Interconnects  

E-Print Network [OSTI]

, among other effects, an increase of electrical resistivity of metal inter- connect and thus of operating frequency has dramatically magnified the electrical power density leading to a signifi- cant tools in fact model interconnections by discretizing them in a set of elementary subsections and thus

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Western Wind and Solar Integration Study  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. It was initiated in 2007 to examine the operational impact of up to 35% energy penetration of wind, photovoltaics (PV), and concentrating solar power (CSP) on the power system operated by the WestConnect group of utilities in Arizona, Colorado, Nevada, New Mexico, and Wyoming (see study area map). WestConnect also includes utilities in California, but these were not included because California had already completed a renewable energy integration study for the state. This study was set up to answer questions that utilities, public utilities commissions, developers, and regional planning organizations had about renewable energy use in the west: (1) Does geographic diversity of renewable energy resource help mitigate variability; (2) How do local resources compare to out-of-state resources; (3) Can balancing area cooperation help mitigate variability; (4) What is the role and value of energy storage; (5) Should reserve requirements be modified; (6) What is the benefit of forecasting; and (7) How can hydropower help with integration of renewables? The Western Wind and Solar Integration Study is sponsored by the U.S. Department of Energy (DOE) and run by NREL with WestConnect as a partner organization. The study follows DOE's 20% Wind Energy by 2030 report, which did not find any technical barriers to reaching 20% wind energy in the continental United States by 2030. This study and its partner study, the Eastern Wind Integration and Transmission Study, performed a more in-depth operating impact analysis to see if 20% wind energy was feasible from an operational level. In DOE/NREL's analysis, the 20% wind energy target required 25% wind energy in the western interconnection; therefore, this study considered 20% and 30% wind energy to bracket the DOE analysis. Additionally, since solar is rapidly growing in the west, 5% solar was also considered in this study. The goal of the Western Wind and Solar Integration Study is to understand the costs and operating impacts due to the variability and uncertainty of wind, PV, and CSP on the grid. This is mainly an operations study, (rather than a transmission study), although different scenarios model different transmission build-outs to deliver power. Using a detailed power system production simulation model, the study identifies operational impacts and challenges of wind energy penetration up to 30% of annual electricity consumption.

Lew, D.; Piwko, R.; Jordan, G.; Miller, N.; Clark, K.; Freeman, L.; Milligan, M.

2011-01-01T23:59:59.000Z

262

Preliminary Response of PJM Interconnection, L.L.C. to the Operating...  

Broader source: Energy.gov (indexed) [DOE]

Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant...

263

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning- June 6, 2013  

Broader source: Energy.gov [DOE]

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

264

H C26 Performance Analysis of Optica1 Interconnection Systems Inch-ing  

E-Print Network [OSTI]

Analysis of Optica1 Interconnection Systems Inch- ing T ransmitter T emperature Dependence .è ¯ ? , ? ? ì

Choi, Woo-Young

265

The Western Water Institutional Solutions-Western Water  

E-Print Network [OSTI]

in Conflict and Cooperation in the Bureau of Reclamation's Upper Colorado Region 1970-2005 Western WaterThe Western Water Institutional Solutions-Western Water Information Network Collaboration Institutional Solutions Project Upper Colorado Region Nathan Eidem Dept. of Geosciences Oregon State University

Wolf, Aaron

266

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked processor  

E-Print Network [OSTI]

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked of free-space optical interconnect for the three-dimensional optoelectronic stacked processor (3DOESP) has VLSI; Optoelectronics; VCSELs 1. Introduction Current electronic interconnection technology cannot keep

Esener, Sadik C.

267

A novel framework for exploring 3-D FPGAs with heterogeneous interconnect fabric  

Science Journals Connector (OSTI)

A heterogeneous interconnect architecture can be a useful approach for the design of 3-D FPGAs. A methodology to investigate heterogeneous interconnection schemes for 3-D FPGAs under different 3-D fabrication technologies is proposed. Application of ... Keywords: 3-D integration, 3-D reconfigurable architectures, FPGAs, design framework, interconnection fabric

Kostas Siozios; Vasilis F. Pavlidis; Dimitrios Soudris

2012-03-01T23:59:59.000Z

268

Integration of a waveguide self-electrooptic effect device and a vertically coupled interconnect waveguide  

DOE Patents [OSTI]

A self-electrooptic effect device ("SEED") is integrated with waveguide interconnects through the use of vertical directional couplers. Light initially propagating in the interconnect waveguide is vertically coupled to the active waveguide layer of the SEED and, if the SEED is in the transparent state, the light is coupled back to the interconnect waveguide.

Vawter, G. Allen (Corrales, NM)

2008-02-26T23:59:59.000Z

269

Tropical Western Pacific CART Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

climate: the Tropical Western Pacific (TWP) CART site, along the equator in the western Pacific Ocean. The TWP locale lies between 10 degrees North latitude and 10 degrees South...

270

Western Solargenics | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Name Western Solargenics Place Coquitlam, British Columbia, Canada Zip V3J 2L7 Sector Solar, Wind energy Product Subsidiary firm of Western Wind, to...

271

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

Science University of Colorado Boulder, Colo. 2013 Research supported by the Western Water Assessment #12 groups like the Western Governors' Association (WGA, 2011) and the State of Colorado (Klein et al., 2011WESTERN WATER ASSESSMENT WHITE PAPER Tracking Socioeconomic Impacts of Drought with Rapid Analytics

Neff, Jason

272

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

WESTERN WATER ASSESSMENT WHITE PAPER Assessing Measures of Drought Impact and Vulnerability in the Intermountain West by William R. Travis, Kristin Gangwer, and Roberta Klein July 2011 #12;Western Water. Travis Kristin Gangwer Roberta Klein Western Water Assessment and Center for Science and technology

Neff, Jason

273

Tropical Western Pacific  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ARM-00-005 ARM-00-005 RPT(TWP)-010.006 LA-UR-004434 Tropical Western Pacific Site Science Mission Plan July - December 2000 Prepared for the U.S. Department of Energy under Contract W-7405-ENG-36 Tropical Western Pacific Project Office Atmospheric and Climate Sciences Group (EES-8) Earth and Environmental Sciences Division Los Alamos National Laboratory Los Alamos, NM 87545 This report and previous versions are available electronically at the following web sites: http://www.arm.gov/docs/sites/twp/science_plan/archive.html http://www.twppo.lanl.gov/docs/office.html 2 DISCLAIMER This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor an agency thereof, nor any of their employees, makes any warranty, expresses or

274

Western Veg Management EA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the the Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest DOE/EA-1863 July 2012 Lead Agency: United States Department of Energy, Western Area Power Administration Cooperating Agency: United States Forest Service Coconino National Forest FINAL ENVIRONMENTAL ASSESSMENT DOE/EA-1863 Glen Canyon - Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project Coconino and Yavapai Counties, Arizona U.S. Department of Energy Western Area Power Administration Desert Southwest Customer Service Region 615 South 43rd Avenue Phoenix, Arizona 85009 U.S. Department of Agriculture US Forest Service Coconino National Forest 1824 S. Thompson St. Flagstaff, AZ 86001 July 2012

275

The Western Water Assessment Annual RISA Report  

E-Print Network [OSTI]

The Western Water Assessment Annual RISA Report Reporting Period: January-December 2006 #12;Western................................................20 #12;Western Water Assessment 2006 Annual Report 3 _____________________________________________________ WWA Mission: The mission of the Western Water Assessment is to identify and characterize regional

Neff, Jason

276

PJM Interconnection, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

LLC Smart Grid Project LLC Smart Grid Project Jump to: navigation, search Project Lead PJM Interconnection, LLC Country United States Headquarters Location Norristown, Pennsylvania Additional Benefit Places Illinois, Indiana, Kentucky, Maryland, Michigan, North Carolina, New Jersey, Ohio, Pennsylvania, Virgin Islands, West Virginia Recovery Act Funding $13,698,091.00 Total Project Value $228203511 Coverage Area Coverage Map: PJM Interconnection, LLC Smart Grid Project Coordinates 40.121497°, -75.3399048° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

277

Geothermal Power and Interconnection: The Economics of Getting to Market  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power and Power and Interconnection: The Economics of Getting to Market David Hurlbut Technical Report NREL/TP-6A20-54192 April 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut Prepared under Task No. WE11.0815 Technical Report NREL/TP-6A20-54192 April 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

278

Interconnecting PV on New York City's Secondary Network Distribution System  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to ???¢????????networks???¢??????? in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1???¢????????PV Deployment Analysis for New York City???¢????????we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2???¢????????A Briefing for Policy Makers on Connecting PV to a Network Grid???¢????????presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3???¢????????Technical Review of Concerns and Solutions to PV Interconnection in New Y

K. Anderson; M. Coddington; K. Burman; S. Hayter; B. Kroposki; and A. Watson

2009-11-30T23:59:59.000Z

279

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

280

Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. |  

Broader source: Energy.gov (indexed) [DOE]

and Initial Comments of PJM Interconnection, and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. On January 5, 2009, ITC Transmission filed with the Department of Energy a request to amend Presidential Permit PP-230-3, which authorizes ITC to own and operate specified electric transmission facilities at the Bunce Creek station that interconnect ITC with Hydro One Networks Inc electric transmission facilities at the Michigan-Ontario border. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Power System Study for Renewable Energy Interconnection in Malaysia  

Science Journals Connector (OSTI)

The renewable energy (RE) sector has grown exponentially in Malaysia with the introduction of the Feed-In-Tariff (FIT) by the Ministry of Energy, Green Technology and Water. Photovoltaic, biogas, biomass and mini hydro are among the renewable energy sources which offer a lucrative tariff to incite developers in taking the green technology route. In order to receive the FIT, a developer is required by the utility company to perform a power system analysis which will determine the technical feasibility of an RE interconnection to the utility company's existing grid system. There are a number of aspects which the analysis looks at, the most important being the load flow and fault levels in the network after the introduction of an RE source. The analysis is done by modelling the utility company's existing network and simulating the network with the interconnection of an RE source. The results are then compared to the values before an interconnection is made as well as ensuring the voltage rise or the increase in fault levels do not violate any pre-existing regulations set by the utility company. This paper will delve into the mechanics of performing a load flow analysis and examining the results obtained.

O F Askar; V K Ramachandaramurthy

2013-01-01T23:59:59.000Z

282

Corrosion of Metallic SOFC Interconnects in Coal Syngas  

SciTech Connect (OSTI)

With recent reductions in the operating temperature of Solid Oxide Fuel Cells (SOFC), the potential of using metallic interconnect has gone up. There is also an interest in using Coal syngas as the fuel gas and thus there is a need to analyze the behavior and performance of metallic interconnects when exposed to Coal syngas. Three high temperature material alloys, Crofer 22 APU, Ebrite and Haynes 230, having the potential to be used as SOFC interconnects were studied in simulated wet coal syngas. These alloys were exposed to syngas at 800 degrees C and for 100 hours. The exposure to coal syngas led to the formation of oxides and spinels, which evidently led to an increase in electrical resistance. Oxidation in a reducing and carburizing environment leads to unique phase and morphology formations. A comparative analysis was carried out for all the three alloys, wherein the samples were characterized by using SEM, EDS, Raman and X-Ray diffraction to obtain the morphology, thickness, composition and crystal structure of the oxides and spinels

Dastane, R.R. (University of West Virginia); Liu, X. (University of West Virginia); Johnson, C., Mao, Scott (University of Pittsburgh)

2007-09-01T23:59:59.000Z

283

Western Renewable Energy Zones-Phase 1 Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Zones-Phase 1 Report Renewable Energy Zones-Phase 1 Report Western Renewable Energy Zones-Phase 1 Report In June 2006, the Western Governors'Association published "Clean Energy, a Strong Economy and a Healthy Environment,"a report from the Clean and Diversified Energy Advisory Committee.3 This report explained that while vast renewable resources exist throughout the West,many reside in remote areas without ready or cost effective access to transmission. Lack of cost effective transmission access was, and remains, the greatest impediment to the rapid development of utility-scale, renewable-rich resource areas. Western Renewable Energy Zones-Phase 1 Report More Documents & Publications EIS-0413: Final Environmental Impact Statement Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

284

The Western Wind and Solar Integration Study (Fact Sheet), NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wear-and-Tear Costs and Emissions Wear-and-Tear Costs and Emissions Impacts of Cycling and Ramping Are Relatively Small The Western Wind and Solar Integration Study (WWSIS) is one of the largest regional wind and solar integration studies to date. It examines the operational impact of up to 35% penetration of wind, photovoltaic (PV), and concentrating solar power (CSP) energy on the electric power system. The goal is to understand the effects of and investigate mitigation options for the variability and uncertainty of wind and solar. Phase 1 Research Phase 1 of the Western Wind and Solar Integration Study (WWSIS1) found no technical barriers to the integration of high penetrations of wind and solar power in the Western Interconnection power system if certain changes to opera- tional practices are made. The two most important changes

285

Monolithically interconnected GaAs solar cells: A new interconnection technology for high voltage solar cell output  

SciTech Connect (OSTI)

Photovoltaic linear concentrator arrays can benefit from high performance solar cell technologies being developed at AstroPower. Specifically, these are the integration of thin GaAs solar cell and epitaxial lateral overgrowth technologies with the application of monolithically interconnected solar cell (MISC) techniques. This MISC array has several advantages which make it ideal for space concentrator systems. These are high system voltage, reliable low cost monolithically formed interconnections, design flexibility, costs that are independent of array voltage, and low power loss from shorts, opens, and impact damage. This concentrator solar cell will incorporate the benefits of light trapping by growing the device active layers over a low-cost, simple, PECVD deposited silicon/silicon dioxide Bragg reflector. The high voltage-low current output results in minimal 12R losses while properly designing the device allows for minimal shading and resistance losses. It is possible to obtain open circuit voltages as high as 67 volts/cm of solar cell length with existing technology. The projected power density for the high performance device is 5 kW/m for an AMO efficiency of 26% at 1 5X. Concentrator solar cell arrays are necessary to meet the power requirements of specific mission platforms and can supply high voltage power for electric propulsion systems. It is anticipated that the high efficiency, GaAs monolithically interconnected linear concentrator solar cell array will enjoy widespread application for space based solar power needs. Additional applications include remote man-portable or ultra-light unmanned air vehicle (UAV) power supplies where high power per area, high radiation hardness and a high bus voltage or low bus current are important. The monolithic approach has a number of inherent advantages, including reduced cost per interconnect and increased reliability of array connections. There is also a high potential for a large number of consumer products.

Dinetta, L.C.; Hannon, M.H.

1995-10-01T23:59:59.000Z

286

The Western Wind and Solar Integration Study Phase 2  

SciTech Connect (OSTI)

The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West.

Lew, D.; Brinkman, G.; Ibanez, E.; Hodge, B. M.; Hummon, M.; Florita, A.; Heaney, M.

2013-09-01T23:59:59.000Z

287

Production process for advanced space satellite system cables/interconnects.  

SciTech Connect (OSTI)

This production process was generated for the satellite system program cables/interconnects group, which in essences had no well defined production process. The driver for the development of a formalized process was based on the set backs, problem areas, challenges, and need improvements faced from within the program at Sandia National Laboratories. In addition, the formal production process was developed from the Master's program of Engineering Management for New Mexico Institute of Mining and Technology in Socorro New Mexico and submitted as a thesis to meet the institute's graduating requirements.

Mendoza, Luis A.

2007-12-01T23:59:59.000Z

288

Novel Composite Materials for SOFC Cathode-Interconnect Contact  

SciTech Connect (OSTI)

This report summarized the research efforts and major conclusions of our University Coal Research Project, which focused on developing a new class of electrically-conductive, Cr-blocking, damage-tolerant Ag-perovksite composite materials for the cathode-interconnect contact of intermediate-temperature solid oxide fuel cell (SOFC) stacks. The Ag evaporation rate increased linearly with air flow rate initially and became constant for the air flow rate {ge} {approx} 1.0 cm {center_dot} s{sup -1}. An activation energy of 280 KJ.mol{sup -1} was obtained for Ag evaporation in both air and Ar+5%H{sub 2}+3%H{sub 2}O. The exposure environment had no measurable influence on the Ag evaporation rate as well as its dependence on the gas flow rate, while different surface morphological features were developed after thermal exposure in the oxidizing and reducing environments. Pure Ag is too volatile at the SOFC operating temperature and its evaporation rate needs to be reduced to facilitate its application as the cathode-interconnect contact. Based on extensive evaporation testing, it was found that none of the alloying additions reduced the evaporation rate of Ag over the long-term exposure, except the noble metals Au, Pt, and Pd; however, these noble elements are too expensive to justify their practical use in contact materials. Furthermore, the addition of La{sub 0.8}Sr{sub 0.2}MnO{sub 3} (LSM) into Ag to form a composite material also did not significantly modify the Ag evaporation rate. The Ag-perovskite composites with the perovskite being either (La{sub 0.6}Sr{sub 0.4})(Co{sub 0.8}Fe{sub 0.2})O{sub 3} (LSCF) or LSM were systematically evaluated as the contact material between the ferritic interconnect alloy Crofer 22 APU and the LSM cathode. The area specific resistances (ASRs) of the test specimens were shown to be highly dependent on the volume percentage and the type of the perovskite present in the composite contact material as well as the amount of thermal cycling that the specimens were subjected to during testing. The Ag-LSCF composite contact materials proved more effective in trapping Cr within the contact material and preventing Cr migration into the cathode than the Ag-LSM composites. Ag-perovskite composite contact materials are promising candidates for use in intermediate-temperature SOFC stacks with ferritic stainless steel interconnects due to their ability to maintain acceptably low ASRs while reducing Cr migration into the cathode material.

J. H. Zhu

2009-07-31T23:59:59.000Z

289

GRR/Section 8-TX-c - Distributed Generation Interconnection | Open Energy  

Open Energy Info (EERE)

GRR/Section 8-TX-c - Distributed Generation Interconnection GRR/Section 8-TX-c - Distributed Generation Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-c - Distributed Generation Interconnection 8-TX-c - Distributed Generation Interconnection.pdf Click to View Fullscreen Contact Agencies Public Utility Commission of Texas Regulations & Policies PUCT Substantive Rule 25.211 PUCT Substantive Rule 25.212 Triggers None specified Click "Edit With Form" above to add content 8-TX-c - Distributed Generation Interconnection.pdf 8-TX-c - Distributed Generation Interconnection.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the process for distributed generation (DG)

290

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Western Area Power Administration Customer Meeting The meeting will begin at 12:30 pm MST We have logged on early for connectivity purposes Please stand-by until the meeting begins Please be sure to call into the conference bridge at: 888-989-6414 Conf. Code 60223 If you have connectivity issues, please contact: 866-900-1011 1 Introduction  Welcome  Introductions  Purpose of Meeting ◦ Status of the SLCA/IP Rate ◦ SLCA/IP Marketing Plan ◦ Credit Worthiness Policy ◦ LTEMP EIS update ◦ Access to Capital  Handout Materials http://www.wapa.gov/crsp/ratescrsp/default.htm 2 SLCA/IP Rate 3 1. Status of Repayment 2. Current SLCA/IP Firm Power Rate (SLIP-F9) 3. Revenue Requirements Comparison Table 4.SLCA/IP Rate 5. Next Steps

291

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

2010-06-10T23:59:59.000Z

292

Exploration of resource and transmission expansion decisions in the Western Renewable Energy Zone initiative  

Science Journals Connector (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (3865%). Solar energy is almost always the second largest source (1441%). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $1734 billion these costs still represent just 1019% of the total delivered cost of renewable energy.

Andrew Mills; Amol Phadke; Ryan Wiser

2011-01-01T23:59:59.000Z

293

2014 State of Western's Assets  

SciTech Connect (OSTI)

In this report we document the State of Westerns Assets in terms of physical equipment, financial resources, strategic direction, and human capital, both at the organizational and regional levels. We identify the condition of our assets today and share what work we will be doing in these areas in the coming years.

none,

2014-01-01T23:59:59.000Z

294

Generation Interconnection Policies and Wind Power: A Discussion of Issues, Problems, and Potential Solutions  

SciTech Connect (OSTI)

This report describes the adoption and implementation of FERC Order 2003 and the reasons for the sharp rise in generation interconnection filings in recent years.

Porter, K.; Fink, S.; Mudd, C.; DeCesaro, J.

2009-01-01T23:59:59.000Z

295

Comparing Germany's and California's Interconnection Processes for PV Systems (White Paper)  

SciTech Connect (OSTI)

Establishing interconnection to the grid is a recognized barrier to the deployment of distributed energy generation. This report compares interconnection processes for photovoltaic projects in California and Germany. This report summarizes the steps of the interconnection process for developers and utilities, the average length of time utilities take to process applications, and paperwork required of project developers. Based on a review of the available literature, this report finds that while the interconnection procedures and timelines are similar in California and Germany, differences in the legal and regulatory frameworks are substantial.

Tweedie, A.; Doris, E.

2011-07-01T23:59:59.000Z

296

Energy Requirement and Speed Analysis of Electrical and Free-Space Optical Digital Interconnections  

Science Journals Connector (OSTI)

Scaling of VLSI technology has been dramatically increasing microelectronic device densities and speeds. However, the interconnection technology between devices does not advance proportionally. Limited available ...

Gke I. Yayla; Philippe J. Marchand

1998-01-01T23:59:59.000Z

297

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2010-01-01T23:59:59.000Z

298

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2009-01-01T23:59:59.000Z

299

Optical Digital Audio Interconnect Based on Organic Light Emitting Diodes and Organic Photodiodes  

Science Journals Connector (OSTI)

An optical interconnect using solely organic optoelectronic components is presented. Careful optimization of the organic light emitting diodes and photodiodes allows us to successfully...

Valouch, Sebastian; Punke, Martin; Kettlitz, Siegfried W; Lemmer, Uli; Gerken, Martina

300

Electrical isolation of component cells in monolithically interconnected modules  

DOE Patents [OSTI]

A monolithically interconnected photovoltaic module having cells which are electrically connected which comprises a substrate, a plurality of cells formed over the substrate, each cell including a primary absorber layer having a light receiving surface and a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, and a cell isolation diode layer having a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, the diode layer intervening the substrate and the absorber layer wherein the absorber and diode interfacial regions of a same conductivity type orientation, the diode layer having a reverse-breakdown voltage sufficient to prevent inter-cell shunting, and each cell electrically isolated from adjacent cells with a vertical trench trough the pn-junction of the diode layer, interconnects disposed in the trenches contacting the absorber regions of adjacent cells which are doped an opposite conductivity type, and electrical contacts.

Wanlass, Mark W. (Golden, CO)

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Grid Integration of Aggregated Demand Response, Part 1: Load Availability Profiles and Constraints for the Western Interconnection  

E-Print Network [OSTI]

demand response participation, including customer fatigue (reduced willingness to respond to events in quick succession to previous events) and price elasticity (demand response participation, including customer fatigue (reduced willingness to respond to events in close proximity to previous events) and price elasticity (

Olsen, Daniel J.

2014-01-01T23:59:59.000Z

302

Grid Integration of Aggregated Demand Response, Part 1: Load Availability Profiles and Constraints for the Western Interconnection  

E-Print Network [OSTI]

is estimated. Keywords: Demand response, ancillary services,of Aggregated Demand Response, Part 1: Load Availabilityof Energy (DOE) Demand Response and Energy Storage

Olsen, Daniel J.

2014-01-01T23:59:59.000Z

303

Benefit of Regional Energy Balancing Service on Wind Integration in the Western Interconnection of the United States: Preprint  

SciTech Connect (OSTI)

This analysis indicates the extent to which pooled regional dispatch for matching generation to load mitigates the costs and improves associated reliability, particularly in scenarios with high penetration of variable output resources, such as wind

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2010-10-01T23:59:59.000Z

304

Grid Integration of Aggregated Demand Response, Part 1: Load Availability Profiles and Constraints for the Western Interconnection  

E-Print Network [OSTI]

0.12-2.47 (0.72) 0.37-3.96 (1.81) SRP 0.14-2.72 (0.72) 0.19-294 MWh 102 MWh 3,323 MWh SRP 196 MW 2,183 MW 58 MWh 1,357SPP Sierra Pacific Power Company SRP Salt River Project TEP

Olsen, Daniel J.

2014-01-01T23:59:59.000Z

305

Grid Integration of Aggregated Demand Response, Part 1: Load Availability Profiles and Constraints for the Western Interconnection  

E-Print Network [OSTI]

0.20-2.33 (0.80) 0.35-4.09 (1.78) BPA 0.10-0.85 (0.35) 0.14-of Load M [ PSE i _ SCL 339%! BpA 032? a 042? } TPWR; 285 MWh 275 MWh 3,200 MWh BPA 68 MW 788 MW 97 MWh 478 MWh

Olsen, Daniel J.

2014-01-01T23:59:59.000Z

306

Grid Integration of Aggregated Demand Response, Part 1: Load Availability Profiles and Constraints for the Western Interconnection  

E-Print Network [OSTI]

energy usage data from CEUS, the Northwest Power and Conservation Council, and the Commercial Building

Olsen, Daniel J.

2014-01-01T23:59:59.000Z

307

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

308

The Western Water Assessment Annual RISA Report  

E-Print Network [OSTI]

The Western Water Assessment Annual RISA Report Reporting Period: January 2007-December 2007 #12;Western Water Assessment 2007 Annual Report 2 Table of Contents I. Areas of Focus-30 #12;Western Water Assessment 2007 Annual Report 3

Neff, Jason

309

Western Wind and Solar Integration Study Phase 2: Preprint  

SciTech Connect (OSTI)

The Western Wind and Solar Integration Study (WWSIS) investigates the impacts of high penetrations of wind and solar power into the Western Interconnection of the United States. WWSIS2 builds on the Phase 1 study but with far greater refinement in the level of data inputs and production simulation. It considers the differences between wind and solar power on systems operations. It considers mitigation options to accommodate wind and solar when full costs of wear-and-tear and full impacts of emissions rates are taken into account. It determines wear-and-tear costs and emissions impacts. New data sets were created for WWSIS2, and WWSIS1 data sets were refined to improve realism of plant output and forecasts. Four scenarios were defined for WWSIS2 that examine the differences between wind and solar and penetration level. Transmission was built out to bring resources to load. Statistical analysis was conducted to investigate wind and solar impacts at timescales ranging from seasonal down to 5 minutes.

Lew, D.; Brinkman, G.; Ibanez, E.; Hodge, B.-M.; King, J.

2012-09-01T23:59:59.000Z

310

The Economic Impact of Wind Power on Ercot Regulation Market.  

E-Print Network [OSTI]

??U.S. wind power generation has grown rapidly in the last decade due to government policies designed to reduce pollution. Although wind power does not contribute (more)

Zheng, Bin

2013-01-01T23:59:59.000Z

311

ERCOT Nodal Protocols Section 2: Definitions and Acronyms  

E-Print Network [OSTI]

Metered Load (AML) Retail Load usage data that has been adjusted for Unaccounted for Energy (UFE on static historical Load data, and adjusted for conditions of the day (e.g., weather, Season, etc devices, that collects time- differentiated energy usage, and that is deployed pursuant to P.U.C. SUBST. R

Tesfatsion, Leigh

312

Western Plains Energy LLC | Open Energy Information  

Open Energy Info (EERE)

Western Plains Energy LLC Jump to: navigation, search Name: Western Plains Energy LLC Place: Oakley, Kansas Zip: 67748 Product: Bioethanol producer using corn as feedstock...

313

Western Area Power Administration Borrowing Authority, Recovery...  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act Microsoft Word - PSRP May 15 2009 WAPA...

314

Case Study - Western Electricity Coordinating Council  

Broader source: Energy.gov (indexed) [DOE]

A Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and...

315

PowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks  

E-Print Network [OSTI]

. Cooling costs can be pro- hibitive (consider the high power budgets of industry-standard six- foot serverPowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks Li Shang Li,peh,jha}@ee.princeton.edu Niraj K. Jha ABSTRACT Power consumption is a critical issue in interconnection network design, driven

Shang, Li

316

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line- based communication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Wu, Hui

317

Predictions, Challenges, and Opportunities in CMOS Compatible On-Chip Optical Interconnect  

E-Print Network [OSTI]

to a few picoseconds. IV. ELECTRICAL VS. OPTICAL INTERCONNECTS Different criteria used in the design of the . Friedman Department of Electrical and Computer Engineering University of Rochester, Rochester, New York for electrical interconnect. Predictions of the performance of CMOS compatible optical devices are made based

Friedman, Eby G.

318

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores  

E-Print Network [OSTI]

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores Li Chen on long interconnects and must be addressed during manufacturing testing. External testing for crosstalk is expensive due to the need for high-speed testers. Built-in self-test, while eliminating the need for a high

California at San Diego, University of

319

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link  

E-Print Network [OSTI]

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link a technique that enables the extraction and modeling of some of the channel's optoelectronic characteristics and optoelectronic com- ponents utilized in the link. 1. Introduction In the last decade optical interconnects have

Esener, Sadik C.

320

The Impact of Dynamic Directories on Multicore Interconnects MATT SCHUCHHARDT, Northwestern University  

E-Print Network [OSTI]

consumption by up to 37.3% (22.9% on average for scientific workloads, and 8.0% for Map-Reduce). 1 Directories on the performance, power, and energy consumption of a multicore processor. We show its. This eliminates a large fraction of on-chip interconnect traversals, thus reducing interconnect power and energy

Kuzmanovic, Aleksandar

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line-based commu- nication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Huang, Michael C.

322

Federal Utility Partnership Working Group - Utility Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

WORKING GROUP - Utility Interconnection Panel M. Renee Jewell, Program/Energy Manager, & Contracting Officer, Forest Service (reneejewell@fs.fed.us) SCENARIO: Fed Agencies had Solar PV Projects To Connect with Utility in California * United States (US) Forest Service (FS) - 1 small Solar Photovoltaic (PV) project; and - 1 small Renewable project (Solar PV) exporting energy to grid. * U.S. National Park Service (NPS) - 24 Small Solar Photovoltaic projects. * U.S. Dept. of Veterans Affairs (VA) - 6 Renewable generation projects of different sizes. FS Region 5 (California) - Solar Photovoltaic Installations Solar PV Project @ Mono Lake Visitor Center (Inyo NF) Solar PV Project (net exporter) @ San Dimas Technology and Development Center SITUATION - Utility Wanted Feds to Sign Its

323

Geothermal Power and Interconnection: The Economics of Getting to Market  

SciTech Connect (OSTI)

This report provides a baseline description of the transmission issues affecting geothermal technologies. The report begins with a comprehensive overview of the grid, how it is planned, how it is used, and how it is paid for. The report then overlays onto this 'big picture' three types of geothermal technologies: conventional hydrothermal systems; emerging technologies such as enhanced engineered geothermal systems (EGS) and geopressured geothermal; and geothermal co-production with existing oil and gas wells. Each category of geothermal technology has its own set of interconnection issues, and these are examined separately for each. The report draws conclusions about each technology's market affinities as defined by factors related to transmission and distribution infrastructure. It finishes with an assessment of selected markets with known geothermal potential, identifying those that offer the best prospects for near-term commercial development and for demonstration projects.

Hurlbut, D.

2012-04-01T23:59:59.000Z

324

Catalytic bipolar interconnection plate for use in a fuel cell  

DOE Patents [OSTI]

A bipolar interconnection plate for use between adjacent fuel cell units in a stacked fuel cell assembly. Each plate is manufactured from an intermetallic composition, examples of which include NiAl or Ni.sub.3 Al which can catalyze steam reforming of hydrocarbons. Distributed within the intermetallic structure of the plate is a ceramic filler composition. The plate includes a first side with gas flow channels therein and a second side with fuel flow channels therein. A protective coating is applied to the first side, with exemplary coatings including strontium-doped or calcium-doped lanthanum chromite. To produce the plate, Ni and Al powders are combined with the filler composition, compressed at a pressure of about 10,000-30,000 psi, and heated to about 600.degree.-1000.degree. C. The coating is then applied to the first side of the completed plate using liquid injection plasma deposition or other deposition techniques.

Lessing, Paul A. (Idaho Falls, ID)

1996-01-01T23:59:59.000Z

325

Gold-based electrical interconnections for microelectronic devices  

DOE Patents [OSTI]

A method of making an electrical interconnection from a microelectronic device to a package, comprising ball or wedge compression bonding a gold-based conductor directly to a silicon surface, such as a polysilicon bonding pad in a MEMS or IMEMS device, without using layers of aluminum or titanium disposed in-between the conductor and the silicon surface. After compression bonding, optional heating of the bond above 363 C. allows formation of a liquid gold-silicon eutectic phase containing approximately 3% (by weight) silicon, which significantly improves the bond strength by reforming and enhancing the initial compression bond. The same process can be used for improving the bond strength of Au--Ge bonds by forming a liquid Au-12Ge eutectic phase.

Peterson, Kenneth A. (Albuquerque, NM); Garrett, Stephen E. (Albuquerque, NM); Reber, Cathleen A. (Corrales, NM); Watson, Robert D. (Tijeras, NM)

2002-01-01T23:59:59.000Z

326

Western Hemisphere Oil Products Balance  

Gasoline and Diesel Fuel Update (EIA)

Western Hemisphere Oil Products Balance Ramn Espinasa, Ph.D. Lead Specialist July 2014 The Energy Innovation Center Energy Division 3 The views expressed by the author do not...

327

p r o g r e s s r e p o r t s Interconnect: A Fundamental Constraint  

E-Print Network [OSTI]

the greatest amounts of area, delay, and energy. With interconnection require- ments scaling faster than. Since typical, logical communication structures have interconnection demands that are greater than two-dimensional VLSI substrates naturally sup- port, interconnection requirements grow faster than logic and become

Haile, Sossina M.

328

Study of metallic materials for solid oxide fuel cell interconnect applications.  

SciTech Connect (OSTI)

Metallic interconnect acts as a gas separator and a gas distributor and therefore, it needs to function adequately in two widely different environments. The interconnect material will be exposed to air on one side and natural gas or coal-derived synthesis gas on the other side. The viable material for the interconnect application must be resistant not only to oxidation but also carburization in hydrocarbon containing low-oxygen environments. In addition, the scales that develop on the exposed surfaces must possess adequate electrical conductivity for them to function as current leads over long service life of the fuel cell. This report addresses five topics of interest for the development of metallic interconnects with adequate performance in fuel cells for long service life. The research conducted over the years and the conclusions reached were used to identify additional areas of research on materials for improved performance of components, especially metallic interconnects, in the complex fuel cell environments. This report details research conducted in the following areas: measurement of area specific electrical resistivity, corrosion performance in dual gas environments by experiments using alloy 446, long term corrosion performance of ferritic and austenitic alloys in hydrogen and methane-reformed synthesis fuel-gas environments, approaches to reduce the area resistance of metallic interconnect, and reduction of electrical resistivity of alumina scales on metallic interconnect. Based on the key requirements for metallic interconnects and the data developed on the corrosion behavior of candidate materials in meeting those requirements, several areas are recommended for further research to develop metallic interconnects with acceptable and reliable long-term performance in solid oxide fuel cells.

Natesan, K.; Zeng, Z.; Nuclear Engineering Division

2009-04-24T23:59:59.000Z

329

Nuclear-renewable hybrid energy systems: Opportunities, interconnections, and needs  

SciTech Connect (OSTI)

As the U.S. energy system evolves, the amount of electricity from variable-generation sources is likely to increase, which could result in additional times when electricity demand is lower than available production. Thus, purveyors of technologies that traditionally have provided base-load electricitysuch as nuclear power plantscan explore new operating procedures to deal with the associated market signals. Concurrently, innovations in nuclear reactor design coupled with sophisticated control systems now allow for more complex apportionment of heat within an integrated system such as one linked to energy-intensive chemical processes. This paper explores one opportunity nuclear-renewable hybrid energy systems. These are defined as integrated facilities comprised of nuclear reactors, renewable energy generation, and industrial processes that can simultaneously address the need for grid flexibility, greenhouse gas emission reductions, and optimal use of investment capital. Six aspects of interaction (interconnections) between elements of nuclear-renewable hybrid energy systems are identified: Thermal, electrical, chemical, hydrogen, mechanical, and information. Additionally, system-level aspects affect selection, design, and operation of this hybrid system type. Throughout the paper, gaps and research needs are identified to promote further exploration of the topic.

Mark F. Ruth; Owen R. Zinaman; Mark Antkowiak; Richard D. Boardman; Robert S. Cherry; Morgan D. Bazilian

2014-02-01T23:59:59.000Z

330

Pulsed laser planarization of metal films for multilevel interconnects  

SciTech Connect (OSTI)

Multilevel interconnect schemes for integrated circuits generally require one or more planarization steps, in order to maintain an acceptably flat topography for lithography and thin-film step coverage on the higher levels. Traditional approaches have involved planarization of the interlevel insulation (dielectric) layers, either by spin-on application (e.g., polyimide), or by reflow (e.g., phosphosilicate glass). We have pursued an alternative approach, in which each metal level is melted (hence planarized) using a pulsed laser prior to patterning. Short (approx.1 ..mu..s) pulses are used to preclude undesirable metallurgical reactions between the film, adhesion or barrier layer, and dielectric layer. Laser planarization of metals is particularly well suited to multilevel systems which include ground or power planes. Results are presented for planarization of gold films on SiO/sub 2/ dielectric layers using a flashlamp-pumped dye laser. The pulse duration is approx.1 ..mu..s, which allows the heat pulse to uniformly penetrate the gold while not penetrating substantially through the underlying SiO/sub 2/ (hence not perturbing the lower levels of metal). Excellent planarization of the gold films is achieved (less than 0.1 ..mu..m surface roughness, even starting with extreme topographic variations), as well as improved conductivity. To demonstrate the process, numerous planarized two-layer structures (transmission lines under a ground plane) were fabricated and characterized. 9 refs., 2 figs.

Tuckerman, D.B.; Schmitt, R.L.

1985-05-01T23:59:59.000Z

331

Response from PJM Interconnection LLC and Pepco to Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Docket No. EO-05-01: This letter will respond to your request for information concerning the potential need for Potomac River Station generation under the three reliability "scenarios" outlined by PJM and PEPCO. Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation More Documents & Publications Information Concerning Reliability Impacts under Various System

332

Reliable low latency I/O in torus-based interconnection networks  

E-Print Network [OSTI]

In today's high performance computing environment I/O remains the main bottleneck in achieving the optimal performance expected of the ever improving processor and memory technologies. Interconnection networks therefore combines processing units...

Azeez, Babatunde

2007-04-25T23:59:59.000Z

333

An energy vision: the transformation towards sustainability --interconnected challenges and solutions  

E-Print Network [OSTI]

consumption levels, lack of energy access, environmental concerns like climate change and air pollution (RCPs) [2 ], the International Energy Agency's World Energy Outlook [3,4 ], and several modeAn energy vision: the transformation towards sustainability -- interconnected challenges

Silver, Whendee

334

Design of Computer Generated Binary Holograms for Free Space Optical Interconnections  

Science Journals Connector (OSTI)

The purpose of this Chapter is to give an introduction to the use of computer generated holograms (CGHs) as free space optical interconnection elements. We will focus mainly on the techniques for designing bin...

I. Montrosset; D. Cojoc; F. Sartori

1997-01-01T23:59:59.000Z

335

A polarizer chip based on CMOS Cu-interconnect for optical telecommunications  

Science Journals Connector (OSTI)

The construction by CMOS Cu-interconnect fabrication technology of an optical chip that performs the function of linear polarization is described. The chip consists of three rows of...

Ko, Cheng-Hao; Lee, Kuei-Jen

2006-01-01T23:59:59.000Z

336

Interconnection of on-site photovoltaic generation to the electric utility. [Conference paper  

SciTech Connect (OSTI)

Electrical interconnection with the local electric utility of small, privately owned, on-site photovoltaic generating systems will be necessary. Legal guidelines exist through PURPA, administered by FERC, to establish interconnection, but economic viability will be the deciding factor in constructing photovoltaic generating systems. Although nationally recognized technical standards do not yet exist for interconnecting photovoltaic generation with an electric utility, most utilities have considered the need for developing cogeneration standards, and a few have developed such standards independently. Additional costs incurred by utilities in providing service interconnections to customers with cogeneration will be passed along to those customers, either as a direct assessment or as part of the applicable rate schedule. An economic-analysis methodology has been developed to allow comparing various possible photovoltaic-generating-system configurations under different utility rate structures and varying economic climates on a consistent basis.

Eichler, C.H.; Kilar, L.A.; Stiller, P.H.

1980-01-01T23:59:59.000Z

337

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

338

Fast Algorithms for High Frequency Interconnect Modeling in VLSI Circuits and Packages  

E-Print Network [OSTI]

used in MEMS, RFID and MRAM. We present the first BEM algorithm to extract interconnect inductance with magnetic materials. The algorithm models magnetic characteristics by the Landau Lifshitz Gilbert equation and fictitious magnetic charges...

Yi, Yang

2011-02-22T23:59:59.000Z

339

Modeling and Analysis of Large-Scale On-Chip Interconnects  

E-Print Network [OSTI]

in computer aided design areas. This dissertation presents new methodologies for addressing the above two important challenging issues for large scale on-chip interconnect modeling and analysis: In the past, the standard statistical circuit modeling techniques...

Feng, Zhuo

2010-07-14T23:59:59.000Z

340

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov [DOE]

Presentation covers the topic of "Renewable Generation and Interconnection to the Electrical Grid in Southern California," given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Determination of Interfacial Adhesion Strength between Oxide Scale and Substrate for Metallic SOFC Interconnects  

SciTech Connect (OSTI)

The interfacial adhesion strength between the oxide scale and the substrate is crucial to the reliability and durability of metallic interconnects in SOFC operating environments. It is necessary, therefore, to establish a methodology to quantify the interfacial adhesion strength between the oxide scale and the metallic interconnect substrate, and furthermore to design and optimize the interconnect material as well as the coating materials to meet the design life of an SOFC system. In this paper, we present an integrated experimental/analytical methodology for quantifying the interfacial adhesion strength between oxide scale and a ferritic stainless steel interconnect. Stair-stepping indentation tests are used in conjunction with subsequent finite element analyses to predict the interfacial strength between the oxide scale and Crofer 22 APU substrate.

Sun, Xin; Liu, Wenning N.; Stephens, Elizabeth V.; Khaleel, Mohammad A.

2008-01-21T23:59:59.000Z

342

Solid oxide fuel cell with single material for electrodes and interconnect  

DOE Patents [OSTI]

A solid oxide fuel cell having a plurality of individual cells. A solid oxide fuel cell has an anode and a cathode with electrolyte disposed therebetween, and the anode, cathode and interconnect elements are comprised of substantially one material.

McPheeters, Charles C. (Naperville, IL); Nelson, Paul A. (Wheaton, IL); Dees, Dennis W. (Downers Grove, IL)

1994-01-01T23:59:59.000Z

343

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

344

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos  

E-Print Network [OSTI]

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos Semiconductor ABSTRACT We present the design of an intelligent optoelectronic chip carrier (IOCC the sapphire. The result is an optoelectronic package that supports full CMOS performance, is mechanically

Bakos, Jason D.

345

Process based cost modeling of emerging optoelectronic interconnects : implications for material platform choice  

E-Print Network [OSTI]

Continuously increasing demand for processing power, storage capacity, and I/O capacity in personal computing, data network, and display interface suggests that optical interconnects may soon supplant copper not only for ...

Liu, Shan, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

346

High-performance parallel processors based on star-coupled wavelength division multiplexing optical interconnects  

DOE Patents [OSTI]

As the performance of individual elements within parallel processing systems increases, increased communication capability between distributed processor and memory elements is required. There is great interest in using fiber optics to improve interconnect communication beyond that attainable using electronic technology. Several groups have considered WDM, star-coupled optical interconnects. The invention uses a fiber optic transceiver to provide low latency, high bandwidth channels for such interconnects using a robust multimode fiber technology. Instruction-level simulation is used to quantify the bandwidth, latency, and concurrency required for such interconnects to scale to 256 nodes, each operating at 1 GFLOPS performance. Performance scales have been shown to .apprxeq.100 GFLOPS for scientific application kernels using a small number of wavelengths (8 to 32), only one wavelength received per node, and achievable optoelectronic bandwidth and latency.

Deri, Robert J. (Pleasanton, CA); DeGroot, Anthony J. (Castro Valley, CA); Haigh, Ronald E. (Arvada, CO)

2002-01-01T23:59:59.000Z

347

File:08-CA-b - CAISO Interconnection Request Process.pdf | Open...  

Open Energy Info (EERE)

Process.pdf Jump to: navigation, search File File history File usage Metadata File:08-CA-b - CAISO Interconnection Request Process.pdf Size of this preview: 463 599 pixels....

348

Design of a decentralized detection filter for a class of interconnected LTI systems  

E-Print Network [OSTI]

In this thesis, we consider the problem of designing a decentralized detection filter for a class of homogeneous interconnected systems. In this class of systems, all subsystems have an identical structure. A fault in a subsystem propagates via...

Shankar, Shamanth

2001-01-01T23:59:59.000Z

349

Simulation of Bio-syngas Production from Biomass Gasification via Pressurized Interconnected Fluidized Beds  

Science Journals Connector (OSTI)

Bio-syngas production from biomass gasification via pressurized interconnected fluidized...T g), gasification pressure (p g) and steam to biomass ratio (S/B) on bio-syngas production

Fei Feng; Guohui Song; Laihong Shen

2014-01-01T23:59:59.000Z

350

E-Print Network 3.0 - at-speed interconnect bist Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Explorit Topic List Advanced Search Sample search results for: at-speed interconnect bist Page: << < 1 2 3 4 5 > >> 1 JOURNAL OF ELECTRONIC TESTING: Theory and Applications 19,...

351

Manufacturing Analysis of SOFC Interconnect Coating Processes - NexTech Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manufacturing Analysis of SOFC Manufacturing Analysis of SOFC Interconnect Coating Processes- NexTech Materials Background The adoption of high-temperature metal alloys as alternatives to traditional ceramic interconnect materials provides a cost effective path for the production of solid oxide fuel cells (SOFCs). Low-cost and effective protective coatings must be developed for the metallic system and stack components for SOFCs to be economical. Since current

352

WESTERN UNIVERSITY DEPARTMENT OF CHEMISTRY  

E-Print Network [OSTI]

WESTERN UNIVERSITY DEPARTMENT OF CHEMISTRY The Department of Chemistry invites applications for a probationary (tenure-track) faculty position at the rank of Assistant Professor in Inorganic Chemistry, externally funded research program, and to develop and teach innovative courses in chemistry

Sinnamon, Gordon J.

353

Western Michigan University, Kalamazoo, USA  

E-Print Network [OSTI]

Western Michigan University, Kalamazoo, USA Michael Backer Auslandssemester USA:WMU, Fall 20101 #12, Unterkunft Auslandssemester USA:WMU, Fall 20102 #12;Bewerbung Schriftliche Bewerbung Notenspiegel in beiden Sprachen Auslandssemester USA:WMU, Fall 20103 #12;Bewerbung Auswahlgespräch mit Domik und Blömer

Hellebrand, Sybille

354

NREL: Transmission Grid Integration - Western Wind Dataset  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Western Wind Dataset Western Wind Dataset Here you will find information about the Western Wind Dataset, including the methodology used to develop the dataset, the accuracy of the data, site selection, and power output. Alert! Important Note Obtain the Western Wind Dataset This dataset was originally created for the Western Wind and Solar Integration Study. These data are modeled data and not actual measured data. Learn more about the datasets including the similarities and differences between the Eastern and Western datasets and the differences from the NREL state wind maps. Methodology 3TIER created the Western Dataset with oversight and assistance from NREL. Numerical Weather Prediction (NWP) models were used to essentially recreate the historical weather for the western U.S. for 2004, 2005, and 2006. The

355

Western Wind and Solar Integration Study  

SciTech Connect (OSTI)

This report provides a full description of the Western Wind and Solar Integration Study (WWSIS) and its findings.

GE Energy

2010-05-01T23:59:59.000Z

356

Our Tradition of Giving Western Bank  

E-Print Network [OSTI]

and friends. This key public space in the Grade II* listed Western Bank Library enables items fromOur Tradition of Giving Western Bank Library Exhibition Gallery The refurbishment of the Exhibition Bank Library 12 May 1959 The restoration and refurbishment of the Western Bank Library Exhibition

Greenlees, John

357

Western Water Assessment White Paper No. 9  

E-Print Network [OSTI]

University of Colorado Boulder, Colo. July 2011 Research supported by the Western Water Assessment #12;LISTWestern Water Assessment Western Water Assessment White Paper No. 9 ASSESSING MEASURES OF DROUGHT;Western Water Assessment White Paper No. 9 ASSESSING MEASURES OF DROUGHT IMPACT AND VULNERABILITY

Neff, Jason

358

Western Pond Turtle Recovery Columbia Gorge  

E-Print Network [OSTI]

Western Pond Turtle Recovery in the Columbia Gorge Project ID 200102700 Submitted by: 4 March 2009 species of concern Western Pond Turtle Washington Status #12;Columbia Mainstem Goals · Maintain;Western Pond Turtle Recovery Current Efforts · Head Start · Population Reintroduction · Predator Control

359

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

N /A

2004-10-21T23:59:59.000Z

360

Western Cooling Efficiency Center | Open Energy Information  

Open Energy Info (EERE)

Efficiency Center Efficiency Center Jump to: navigation, search Name Western Cooling Efficiency Center Place Davis, CA Website http://http://wcec.ucdavis.edu References Western Cooling Efficiency Center [1] Information About Partnership with NREL Partnership with NREL Yes Partnership Type Test & Evaluation Partner Partnering Center within NREL Electricity Resources & Building Systems Integration LinkedIn Connections Western Cooling Efficiency Center is a research institution located in Davis, CA, at the University of California at Davis (UC Davis). References ↑ "Western Cooling Efficiency Center" Retrieved from "http://en.openei.org/w/index.php?title=Western_Cooling_Efficiency_Center&oldid=382319" Categories: Clean Energy Organizations

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Plastic deformation in Al (Cu) interconnects stressed by electromigration and studied by synchrotron polychromatic X-ray microdiffraction  

E-Print Network [OSTI]

Plastic deformation in Al (Cu) interconnects stressed bygrain orientation [7], study plastic deformation [12-15] andThis aspect of EM-induced plastic deformation in grains

Chen, Kai; Advanced Light Source; UCLA

2008-01-01T23:59:59.000Z

362

Power System Generation and Inter-Connection Planning Model (SUPER) | Open  

Open Energy Info (EERE)

Power System Generation and Inter-Connection Planning Model (SUPER) Power System Generation and Inter-Connection Planning Model (SUPER) Jump to: navigation, search Tool Summary Name: Power System Generation and Inter-Connection Planning Model (SUPER) Agency/Company /Organization: Latin American Energy Organization Sector: Energy Focus Area: Renewable Energy, Hydro Topics: Resource assessment Resource Type: Software/modeling tools Website: www.olade.org/superEn.html References: SUPER website [1] "This model is useful for multi-year electricity system planning studies, making it possible to analyze, optimize, simulate and develop hydrothermal power system expansion plans." References ↑ "SUPER website" Retrieved from "http://en.openei.org/w/index.php?title=Power_System_Generation_and_Inter-Connection_Planning_Model_(SUPER)&oldid=329

363

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

364

Method of bonding an interconnection layer on an electrode of an electrochemical cell  

DOE Patents [OSTI]

An electrochemical cell containing an air electrode, contacting electrolyte and electronically conductive interconnection layer, and a fuel electrode, has the interconnection layer attached by: (A) applying a thin, closely packed, discrete layer of LaCrO[sub 3] particles, doped with an element selected from the group consisting of Ca, Sr, Co, Ba, Mg and their mixtures on a portion of the air electrode, and then (B) electrochemical vapor depositing a dense skeletal structure between and around the doped LaCrO[sub 3] particles. 2 figs.

Pal, U.B.; Isenberg, A.O.; Folser, G.R.

1992-01-14T23:59:59.000Z

365

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov (indexed) [DOE]

SOUTHERN CALIFORNIA EDISON® SOUTHERN CALIFORNIA EDISON® SM 1 Federal Utility Partnership Working Group Providence, Rhode Island April 15, 2010 Renewable Generation and Interconnection to the Electrical Grid in Southern California Daniel Tunnicliff, P.E. Manager, Government & Institutions SOUTHERN CALIFORNIA EDISON® SM 2 Overview * SCE Overview * SCE Procurement Objectives * Renewable Procurement * Challenges to Meeting Renewable Goals in California * Interconnection Processes * Lessons Learned SOUTHERN CALIFORNIA EDISON® SM 3 SCE Overview * Large system  13 million residents  4.8 million customer accounts  50,000-square-mile service area * Nation's leader in environmental solutions  Energy efficiency  Renewable energy procurement  Electric transportation  Advanced meters  Smart grid

366

The Western Wind and Solar Integration Study Phase 2 (Fact Sheet), NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Energy Efficiency of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. The Western Wind and Solar Integration Study Phase 2 An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators The electric grid is a highly complex, interconnected machine. Changing one part of the grid can have consequences elsewhere. Adding variable renewable generation such as wind and solar power affects the operation of the other types of power plants, and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions, but do those increases in costs and emissions from cycling negate the overall benefits of integrating renewables?

367

Western Water Markets: Effectiveness and Efficiency  

Science Journals Connector (OSTI)

Most rivers throughout the western U.S. are fully appropriated. New ... by a detailed look at transactions in the Colorado River Basin.

Christopher Goemans; James Pritchett

2014-01-01T23:59:59.000Z

368

Problems of intraplate extensional tectonics, Western United...  

Open Energy Info (EERE)

on the Great Basin Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Problems of intraplate extensional tectonics, Western United...

369

Long-Distance Interconnection as Solar Resource Intermittency Solution: Optimizing the Use of Energy Storage and the Geographic  

E-Print Network [OSTI]

of Energy Storage and the Geographic Dispersion + Interconnection of Solar Generating Facilities. Marc J. R energy targets. Variability of the solar resource occurs across many different temporal scales: from energy storage and Long-distance interconnection coupled with geographic dispersion of solar generating

370

Three-Dimensional Analysis of Solid Oxide Fuel Cell Ni-YSZ Anode Interconnectivity James R. Wilson,a  

E-Print Network [OSTI]

1 Three-Dimensional Analysis of Solid Oxide Fuel Cell Ni-YSZ Anode Interconnectivity James R of interconnectivity of solid-oxide fuel cell (SOFC) electrode phases. The method was applied to the three, and hence was not electrochemically active. #12;2 1. Introduction Attempts to understand solid oxide fuel

Kalies, William D.

371

A Guidebook on Grid Interconnection and Islanded Operation of Mini-Grid Power Systems Up to 200 kW  

E-Print Network [OSTI]

Nehru National Solar Mission: Phase II Policy Document. Solar Friendly Communities Permitting, Interconnection, and Net Metering: An Overview of Model Standards and PolicySolar ABCs) funded by the USA Department of Energy, pushes for reform and national standardization on interconnection policy.

Greacen, Chris

2014-01-01T23:59:59.000Z

372

OIL: a nano-photonics optical interconnect library for a new photonic networks-on-chip architecture  

Science Journals Connector (OSTI)

In this paper, we present OIL, a parameterized Optical Interconnect Library of silicon nano-photonic devices for system level interconnect planning/analysis and low power high performance design exploration under a new holistic photonic Networks-on-Chip ... Keywords: computer aided design, high performance, low power, photonic networks-on-chip

Duo Ding; David Z. Pan

2009-07-01T23:59:59.000Z

373

at Western University Located in London, Ontario, Western University is situated directly in the  

E-Print Network [OSTI]

ProjectCentre@Western: joint venture between Western and the Fraunhofer Institute of Chemical Technology in Germany · As Canada, construction, clean technologies, IT and energy storage Wind Engineering · Boundary

Denham, Graham

374

How Western Does Business: An Explanation of Western's Products and Services  

SciTech Connect (OSTI)

The mission of the Western Area Power Administration is to market and deliver reliable, renewable, cost-based hydroelectric power and related services. This guide provides an overview of Westerns history and how Western carries out that mission and provides electrical, transmission and ancillary services. It also discusses how we develop plans for marketing our most valuable resourceslong-term firm capacity and energy.

none,

2012-10-01T23:59:59.000Z

375

Effect of Via Separationand Low-k Dielectric Materials on the Thermal Characteristics of Cu Interconnects  

E-Print Network [OSTI]

Effect of Via Separationand Low-k Dielectric Materials on the Thermal Characteristics of Cu in low-k based interconnect structures by providing lower thermal resistance paths. In this paper that the temperature is highly dependent on the via separation. A 3-D electro-thermal simulation methodology using

376

Compact quasi-analytic equations for estimating the temperature distribution of ULSI interconnections  

Science Journals Connector (OSTI)

With the wide application of low dielectric constant materials in ULSI circuits, the problem of heat dissipation becomes more critical due to the small thermal conductivity of such materials. Compact quasi-analytic equations for estimating the temperature ... Keywords: ULSI circuits, interconnection, thermal behavior simulation

X. Xiao; X. You; G. Ruan

2002-04-01T23:59:59.000Z

377

Modeling and Simulation Environment for Photonic Interconnection Networks in High Performance Computing  

E-Print Network [OSTI]

at the scale of high performance computer clusters and warehouse scale data centers, system level simulations and results for rack scale photonic interconnection networks for high performance computing. Keywords: optical to the newsworthy power consumption [3], latency [4] and bandwidth challenges [5] of high performance computing (HPC

Bergman, Keren

378

THE ANALYSYS OF INFORMATION IMPACTS IN COORDINATING DEFENCE AGAINST MALICIOUS ATTACKS FOR INTERCONNECTED  

E-Print Network [OSTI]

and the physical behaviors of power systems. Secondly, system operators are assumed able to perform certain-ordination of Transmission of Electricity) operation handbook [6]. Meanwhile, multi-agent systems (MAS) have been widely FOR INTERCONNECTED POWER SYSTEMS Ettore Bompard George Gross Roberto Napoli Fei Xue Politecnico di Torino University

Gross, George

379

Optimization of Interconnects Between Accelerators and Shared Memories in Dark Silicon Jason Cong and Bingjun Xiao  

E-Print Network [OSTI]

Optimization of Interconnects Between Accelerators and Shared Memories in Dark Silicon Jason Cong, 90095 {cong, xiao}@cs.ucla.edu Abstract--Application-specific accelerators provide orders-of- magnitude improvement in energy-efficiency over CPUs, and accelerator-rich computing platforms are showing promise

Cong, Jason "Jingsheng"

380

Optimization and Visualization of the North American Eastern Interconnect Power Market  

E-Print Network [OSTI]

. Hale DHALE@eia.doe.gov U.S. Energy Information Agency Washington, DC 20585 USA Thomas J. OverbyeOptimization and Visualization of the North American Eastern Interconnect Power Market Douglas R Overbye@ece.uiuc.edu University of Illinois at Urbana-Champaign Urbana, IL 61801 USA Abstract This paper

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or  

E-Print Network [OSTI]

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or system Electricity and Gas: A system used to distribute electricity and gas around the world/certain area, by compromising to minimise costs and generate the most electricity and gas as possible, which maximises profits

Wright, Francis

382

Graphene based nanomaterials for VLSI interconnect and energy-storage applications  

Science Journals Connector (OSTI)

As IC feature sizes continue to be scaled below 45 nanometer, copper wires exhibit significant "size effects" resulting in a sharp rise in their resistivity, which, in turn, has adverse impact both on their performance as well as reliability--in the ... Keywords: carbon nanomaterials, carbon nanotubes, graphene nano-ribbons, interconnects, passives.

Kaustav Banerjee

2009-07-01T23:59:59.000Z

383

Selection and Evaluation of Heat-Resistant Alloys for Planar SOFC Interconnect Applications  

SciTech Connect (OSTI)

Over the past several years, the steady reduction in SOFC operating temperatures to the intermediate range of 700~850oC [1] has made it feasible for lanthanum chromite to be supplanted by metals or alloys as the interconnect materials. Compared to doped lanthanum chromite, metals or alloys offer significantly lower raw material and fabrication costs. However, to be a durable and reliable, a metal or alloy has to satisfy several functional requirements specific to the interconnect under SOFC operating conditions. Specifically, the interconnect metal or alloy should possess the following properties: (i) Good surface stability (resistance to oxidation, hot corrosion, and carburization) in both cathodic (air) and anodic (fuel) atmospheres; (ii) Thermal expansion matching to the ceramic PEN (positive cathode-electrolyte-negative anode) and seal materials (as least for a rigid seal design); (iii) High electrical conductivity through both the bulk material and in-situ formed oxide scales; (iv) Bulk and interfacial thermal mechanical reliability and durability at the operating temperature; (v) Compatibility with other materials in contact with interconnects such as seals and electrical contact materials.

Yang, Z Gary; Weil, K. Scott; Paxton, Dean M.; Stevenson, Jeffry W.

2002-11-21T23:59:59.000Z

384

Ionized physical vapor deposition of integrated circuit interconnects* J. Hopwood,a)  

E-Print Network [OSTI]

alloy silicide gate level and several metal-SiO2 interlayer dielectric ILD levels joined together metal layers. By the year 2007 it is predicted that logic circuits will use 6 to 7 interconnected metal physical vapor deposition I-PVD . The technique economically creates a unidirectional flux of metal which

385

Synthesis of electrical networks interconnecting PZT actuators to damp mechanical vibrations  

E-Print Network [OSTI]

This paper proves that it is possible to damp mechanical vibrations of some beam frames by means of piezoelectric actuators interconnected via passive networks. We create a kind of electromechanical wave guide where the electrical velocity group equals the mechanical one thus enabling an electromechanical energy transfer. Numerical simulations are presented which prove the technical feasibility of proposed device

F. dell'Isola; E. G. Henneke; M. Porfiri

2010-08-30T23:59:59.000Z

386

Optically Interconnected Data Center Architecture for Bandwidth Intensive Energy Efficient Networking  

E-Print Network [OSTI]

Optically Interconnected Data Center Architecture for Bandwidth Intensive Energy Efficient) 854 2900, e-mail: howard@ee.columbia.edu ABSTRACT The relentless rise of data-intensive cloud will either be prohibitively costly, overly complex, or result in unsustainable energy requirements. Network

Bergman, Keren

387

ELECTRIFICATION OF ISOLATED AREAS BY INTERCONNECTING DIFFERENT RENEWABLE SOURCES OF ENERGY: A SUSTANAIBLE APPROACH  

E-Print Network [OSTI]

of a methodology for rural electrification by micro-grids based upon different renewable resources. > ApplicationELECTRIFICATION OF ISOLATED AREAS BY INTERCONNECTING DIFFERENT RENEWABLE SOURCES OF ENERGY to absorb innovations such as rural electrification by isolated micro grid Sustainable approach The success

388

Transient Analysis of a CMOS Inverter Driving Resistive Interconnect Kevin T. Tang and Eby G. Friedman  

E-Print Network [OSTI]

are characterized by the th power law model. In order to emphasize the nonlinear behavior of a CMOS inverterTransient Analysis of a CMOS Inverter Driving Resistive Interconnect Kevin T. Tang and Eby G. Friedman Department of Electrical and Computer Engineering University of Rochester Rochester, New York

Friedman, Eby G.

389

A Self-Reconfigurable Lightweight Interconnect for Scalable Processor Fabrics Heiner Giefers and Marco Platzner  

E-Print Network [OSTI]

, energy, and execution time. Therefore it is of high interest to also study alternative interconnects compile-time informa- tion and reconfigures the global network due to program demands. We consider data of the switch's ports. Communication within a sub-bus is established by broadcasting to the bus segment

Hellebrand, Sybille

390

Application Of Ti-Based Self-Formation Barrier Layers To Cu Dual-Damascene Interconnects  

SciTech Connect (OSTI)

Cu interconnects have been used extensively in ULSI devices. However, large resistance-capacitance delay and poor device reliability have been critical issues as the device feature size has reduced to nanometer scale. In order to achieve low resistance and high reliability of Cu interconnects, we have applied a thin Ti-based self-formed barrier (SFB) using Cu(Ti) alloy seed to 45nm-node dual damascene interconnects and evaluated its performance. The line resistance and via resistance decreased significantly, compared with those of conventional Ta/TaN barriers. The stress migration performance was also drastically improved using the SFB process. A performance of time dependent dielectric breakdown revealed superior endurance. These results suggest that the Ti-based SFB process is one of the most promising candidates for advanced Cu interconnects. TEM and X-ray photoelectron spectroscopy observations for characterization of the Ti-based SFB structure were also performed. The Ti-based SFB consisted of mainly amorphous Ti oxides. Amorphous or crystalline Ti compounds such as TiC, TiN, and TiSi formed beneath Cu alloy films, and the formation varied with dielectric.

Ito, Kazuhiro; Kohama, Kazuyuki [Department of Materials Science and Engineering, Kyoto University, Kyoto 606-8501 (Japan); Ohmori, Kazuyuki; Mori, Kenichi; Maekawa, Kazuyoshi; Asai, Koyu [Process Technology Div., Renesas Electronics Corporation, Hitachinaka, Ibaraki 312-8504 (Japan); Murakami, Masanori [The Ritsumeikan Trust, Nakagyo-ku, Kyoto 604-8520 (Japan)

2010-11-24T23:59:59.000Z

391

HVDC Control Strategies to Improve Transient Stability in Interconnected Power Systems  

E-Print Network [OSTI]

HVDC Control Strategies to Improve Transient Stability in Interconnected Power Systems J. Hazra Dpt of Li`ege, Belgium, dernst@ulg.ac.be Abstract--This paper presents three HVDC modulation strate- gies flow settings through the HVDC-links. The proposed techniques are tested on the IEEE 24-Bus reliability

Boyer, Edmond

392

Western Turbine | Open Energy Information  

Open Energy Info (EERE)

Turbine Turbine Jump to: navigation, search Name Western Turbine Place Aurora, Colorado Zip 80011 Sector Wind energy Product Wind Turbine Installation and Maintainance. Coordinates 39.325162°, -79.54975° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.325162,"lon":-79.54975,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

393

Phase 1 - Evaluation of a Functional Interconnect System for Solid Oxide Fuel Cells  

SciTech Connect (OSTI)

This project is focused on evaluating the suitability of materials and complex multi-materials systems for use as solid oxide fuel cell interconnects. ATI Allegheny Ludlum has generated promising results for interconnect materials which incorporate modified surfaces. Methods for producing these surfaces include cladding, which permits the use of novel materials, and modifications via unique thermomechanical processing, which allows for the modification of materials chemistry. The University of Pittsburgh is assisting in this effort by providing use of their in-place facilities for dual atmosphere testing and ASR measurements, along with substantial work to characterize post-exposure specimens. Carnegie Mellon is testing interconnects for chromia scale spallation resistance using macro-scale and nano-scale indentation tests. Chromia spallation can increase electrical resistance to unacceptable levels and interconnect systems must be developed that will not experience spallation within 40,000 hours at operating temperatures. Spallation is one of three interconnect failure mechanisms, the others being excessive growth of the chromia scale (increasing electrical resistance) and scale evaporation (which can poison the cathode). The goal of indentation fracture testing at Carnegie Mellon is to accelerate the evaluation of new interconnect systems (by inducing spalls at after short exposure times) and to use fracture mechanics to understand mechanisms leading to premature interconnect failure by spallation. Tests include bare alloys from ATI and coated systems from DOE Laboratories and industrial partners, using ATI alloy substrates. West Virginia University is working towards developing a cost-effective material for use as a contact material in the cathode chamber of the SOFC. Currently materials such as platinum are well suited for this purpose, but are cost-prohibitive. For the solid-oxide fuel cell to become a commercial reality it is imperative that lower cost components be developed. Based on the results obtained to date, it appears that sterling silver could be an inexpensive, dependable candidate for use as a contacting material in the cathode chamber of the solid-oxide fuel cell. Although data regarding pure silver samples show a lower rate of thickness reduction, the much lower cost of sterling silver makes it an attractive alternative for use in SOFC operation.

James M. Rakowski

2006-09-30T23:59:59.000Z

394

Stochastic modeling western paintings for effective classification  

Science Journals Connector (OSTI)

As one of the most important cultural heritages, classical western paintings have always played a special role in human live and been applied for many different purposes. While image classification is the subject of a plethora of related publications, ... Keywords: Classic western paintings, Cultural heritage, Identification, Image retrieval

Jialie Shen

2009-02-01T23:59:59.000Z

395

Western Human Resources Occupational Health and Safety  

E-Print Network [OSTI]

Wavelength (nm) Power/Energy Open Enclosed Embedded Note: For each laser/laser system, a Laser Beam. Training/Experience Regarding Lasers/Laser Systems and Western Laser Safety Training Date of the Applicant or Contact Person before operating lasers/laser systems. 3 Western Laser workers who will use an open laser

Sinnamon, Gordon J.

396

Notice of Violation, Western Allied Mechanical, Inc. - WEA-2009...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Notice of Violation, Western Allied Mechanical, Inc. - WEA-2009-03 Notice of Violation, Western Allied Mechanical, Inc. - WEA-2009-03 September 9, 2009 Issued to Western Allied...

397

Preliminary Notice of Violation,Western Allied Mechanical, Inc...  

Broader source: Energy.gov (indexed) [DOE]

Western Allied Mechanical, Inc. - WEA-2009-03 Preliminary Notice of Violation,Western Allied Mechanical, Inc. - WEA-2009-03 April 7, 2009 Issued to Western Allied Mechanical, Inc....

398

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Broader source: Energy.gov (indexed) [DOE]

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

399

The economics of carbon sequestration in western Oregon forests.  

E-Print Network [OSTI]

??This study considered regional forest policies for sequestering carbon in existing forests in western Oregon. A model of log markets in western Oregon was employed (more)

Im, Eun Ho

2007-01-01T23:59:59.000Z

400

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Relevance of Generation The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland Subcontract Report NREL/SR-6A20-48987 October 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland

402

Making Connections: Case Studies of Interconnection Barriers and their Impact on Distributed Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Interconnection of Interconnection Barriers and their Impact on Distributed Power Projects M a k i n g M a k i n g Connections Connections NREL/SR-200-28053 Revised July 2000 United States Department Of Energy Distributed Power Program Office of Energy Efficiency and Renewable Energy, Office of Power Technologies Joseph Galdo DOE Distributed Power Program Manager Office of Power Technologies, EE-15 U.S. Department of Energy Forrestal Building, 5H-021 1000 Independence Avenue SW Washington, DC 20585 Phone: (202) 586-0518 Fax: (202) 586-1640 Richard DeBlasio NREL Distributed Power Program Manager National Renewable Energy Laboratory 1617 Cole Blvd. (MS 3214) Golden, CO 80601 Phone: (303) 384-6452 Fax: (303) 384-6490 Gary Nakarado* National Renewable Energy Laboratory NREL Distributed Power Program Technical Monitor

403

The Development of Interconnection Standards in Six States In 2007-2008  

SciTech Connect (OSTI)

This paper discusses the process of developing standards for the interconnection of photovoltaic systems and other generators under ten megawatts to the electric grid. State utility commission rulemakings in 2007-2008 in Florida, New Mexico, North Carolina, Maryland, Illinois and Utah provide the basis for analysis of what is and should be considered in the development of standards, and how the process can be improved. State interconnection standards vary substantially, and many utilities have discretion to establish additional or different requirements, creating literally hundreds of sets of rules. This lack of uniformity imposes a significant cost on project developers and installers to track and comply with applicable rules. As well, burdensome provisions and uncertain costs and timelines present formidable barriers to entry, which advocates have limited resources to challenge. For a better process, the author proposes: establishing federal standards as a baseline, involving solar advocates, and developing a utility cost-recovery mechanism.

Keyes, Jason B.

2008-04-01T23:59:59.000Z

404

A novel design for monolithic interconnected modules (MIMs) for thermophotovoltaic (TPV) power conversion  

SciTech Connect (OSTI)

The design for the fabrication of Monolithic Interconnected Modules (MIMs) for thermophotovoltaic (TPV) power conversion described in this paper utilizes a novel, interdigitated contacting scheme that increases the flexibility in the size of the component cells and hence the output current and voltage of the module. This flexibility is gained at the expense of only minimally increased grid obscuration. Because the design uses the grid fingers of the component cells as the interconnect structure, the area of the device used for this purpose becomes negligible. In this paper the authors report on the specifics of the design as well as issues related to the fabrication of the modules. Preliminary performance data for representative modules also are offered.

Ward, J.S.; Duda, A.; Wanlass, M.W. [National Renewable Energy Lab., Golden, CO (United States)] [and others

1997-06-01T23:59:59.000Z

405

Bipolar plating of metal contacts onto oxide interconnection for solid oxide electrochemical cell  

DOE Patents [OSTI]

Disclosed is a method of forming an adherent metal deposit on a conducting layer of a tube sealed at one end. The tube is immersed with the sealed end down into an aqueous solution containing ions of the metal to be deposited. An ionically conducting aqueous fluid is placed inside the tube and a direct current is passed from a cathode inside the tube to an anode outside the tube. Also disclosed is a multi-layered solid oxide fuel cell tube which consists of an inner porous ceramic support tube, a porous air electrode covering the support tube, a non-porous electrolyte covering a portion of the air electrode, a non-porous conducting interconnection covering the remaining portion of the electrode, and a metal deposit on the interconnection.

Isenberg, Arnold O. (Forest Hills Boro, PA)

1987-01-01T23:59:59.000Z

406

Viscosity Solutions of Systems of PDEs with Interconnected Obstacles and Switching Problem  

SciTech Connect (OSTI)

This paper deals with existence and uniqueness of a solution in viscosity sense, for a system of m variational partial differential inequalities with inter-connected obstacles. A particular case is the Hamilton-Jacobi-Bellmann system of the Markovian stochastic optimal m-states switching problem. The switching cost functions depend on (t,x). The main tool is the notion of systems of reflected backward stochastic differential equations with oblique reflection.

Hamadene, S., E-mail: hamadene@univ-lemans.fr; Morlais, M. A., E-mail: Marie_Amelie.Morlais@univ-lemans.fr [Universite du Maine, LMM (France)

2013-04-15T23:59:59.000Z

407

Optimal control locations for a class of large interconnected dynamic systems  

E-Print Network [OSTI]

system, a stability crisis usually arises when a fault occurs at one or more major transmission lines. After such a fault, the system suddenly possesses an excess of unevenly distributed kinetic energy. If no action is taken, this energy excess could... cause the phase angles of the generators to swing wildly and thus overload and eventually trip breakers on some interconnecting transmission lines. An open breaker essentially deletes a line from the system, which in turn triggers the possible...

Antonio, John Kirby

2012-06-07T23:59:59.000Z

408

Performance optimization of interconnections for ultra-high-speed digital circuits  

E-Print Network [OSTI]

as distributed transmission line systems. Criteria for the design are outlined and studied. The findings of these studies are then applied to requirements for optimal design of interconnection schemes at various levels of high-speed digital system packaging... . V 40 A. Conductor Bends . . . . . . . . . . . . . . . . 42 B. Impedance Step/Mismatched Transmission Line Element 46 C. Fan-out/Fan-in Signal Distribution Networks D. Conclusions for Discontinuity Behaviors 55 71 V COUPLED LINE BEHAVIORS...

Carey, David Harrison

2012-06-07T23:59:59.000Z

409

Corrosion and Protection of Metallic Interconnects in Solid Oxide Fuel Cells  

SciTech Connect (OSTI)

Energy security and increased concern over environmental protection have spurred a dramatic world-wide growth in research and development of fuel cells, which electrochemically convert incoming fuel into electricity with no or low pollution. Fuel cell technology has become increasingly attractive to a number of sectors, including utility, automotive, and defense industries. Among the various types of fuel cells, solid oxide fuel cells (SOFCs) operate at high temperature (typically 650-1,000 C) and have advantages in terms of high conversion efficiency and the flexibility of using hydrocarbon fuels, in addition to hydrogen. The high temperature operation, however, can lead to increased mass transport and interactions between the surrounding environment and components that are required to be stable during a lifetime of thousands of hours and up to hundreds of thermal cycles. For stacks with relatively low operating temperatures (<800 C), the interconnects that are used to electrically connect a number of cells in series are typically made from cost-effective metals or alloys. The metallic interconnects must demonstrate excellent stability in a very challenging environment during SOFC operation, as they are simultaneously exposed to both an oxidizing (air) environment on the cathode side and a reducing environment (hydrogen or a reformed hydrocarbon fuel) on the anode side. Other challenges include the fact that water vapor is likely to be present in both of these environments, and the fuel is likely to contain impurities, such as sulfides. Since the fuel is usually a reformed hydrocarbon fuel, such as natural gas, coal gas, biogas, gasoline, etc., the interconnect is exposed to a wet carbonaceous environment at the anode side. Finally, the interconnect must be stable towards any adjacent components, such as electrodes, seals and electrical contact materials, with which it is in physical contact.

Yang, Z Gary; Stevenson, Jeffry W.; Singh, Prabhakar

2007-12-09T23:59:59.000Z

410

Oxidation Resistant, Cr Retaining, Electrically Conductive Coatings on Metallic Alloys for SOFC Interconnects  

SciTech Connect (OSTI)

This report describes significant results from an on-going, collaborative effort to enable the use of inexpensive metallic alloys as interconnects in planar solid oxide fuel cells (SOFCs) through the use of advanced coating technologies. Arcomac Surface Engineering, LLC, under the leadership of Dr. Vladimir Gorokhovsky, is investigating filtered-arc and filtered-arc plasma-assisted hybrid coating deposition technologies to promote oxidation resistance, eliminate Cr volatility, and stabilize the electrical conductivity of both standard and specialty steel alloys of interest for SOFC metallic interconnect (IC) applications. Arcomac has successfully developed technologies and processes to deposit coatings with excellent adhesion, which have demonstrated a substantial increase in high temperature oxidation resistance, stabilization of low Area Specific Resistance values and significantly decrease Cr volatility. An extensive matrix of deposition processes, coating compositions and architectures was evaluated. Technical performance of coated and uncoated sample coupons during exposures to SOFC interconnect-relevant conditions is discussed, and promising future directions are considered. Cost analyses have been prepared based on assessment of plasma processing parameters, which demonstrate the feasibility of the proposed surface engineering process for SOFC metallic IC applications.

Vladimir Gorokhovsky

2008-03-31T23:59:59.000Z

411

Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.  

SciTech Connect (OSTI)

Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

2012-02-01T23:59:59.000Z

412

Effect of interconnect creep on long-term performance of SOFC of one cell stacks  

SciTech Connect (OSTI)

Creep deformation becomes relevant for a material when the operating temperature is near or exceeds half of its melting temperature (in degrees of Kelvin). The operating temperatures for most of the solid oxide fuel cells (SOFC) under development in the SECA program are around 1073oK. High temperature ferritic alloys are potential candidates as interconnect (IC) materials and spacers due to their low cost and CTE compatibility with other SOFC components. Since the melting temperature of most stainless steel is around 1800oK, possible creep deformation of IC under the typical cell operating temperature should not be neglected. In this paper, the effects of interconnect creep behavior on stack geometry change and stress redistribution of different cell components are predicted and summarized. The goal of the study is to investigate the performance of the fuel cell stack by obtaining the fuel and air channel geometry changes due to creep of the ferritic stainless steel interconnect, therefore indicating possible SOFC performance change under long term operations. IC creep models were incorporated into SOFC-MP and Mentat FC, and finite element analyses were performed to quantify the deformed configuration of the SOFC stack under the long term steady state operating temperature. It is found that creep behavior of the ferritic stainless steel IC contributes to narrowing of both the fuel and the air flow channels. In addition, stress re-distribution of the cell components suggests the need for a compliant sealing material that also relaxes at operating temperature.

Liu, Wenning N.; Sun, Xin; Khaleel, Mohammad A.

2008-02-01T23:59:59.000Z

413

Life Prediction of Coated and Uncoated Metallic Interconnect for Solid Oxide Fuel Cell Applications  

SciTech Connect (OSTI)

Oxidation reaction of the ferritic stainless interconnects in a typical SOFC working environment is unavoidable and the thickness of the oxide scale will continue to grow with operating time, even with protective coatings. The interfacial strength of the various interfaces for the uncoated and coated ferritic interconnects is crucial to long term performance of SOFCs. In this paper, we employ an integrated experimental/modeling approach to quantify the interfacial strength and to further predict the life of Crofer 22 APU as SOFC interconnect under isothermal cooling condition. The life of Crofer 22 APU was predicted by comparing the predicted interfacial strength, interfacial stresses induced by the cooling process from the operating temperature to room temperature, together with the growth kinetics of oxide scale with and without spinel coating. It was found that the interfacial strength between the oxide scale and Crofer 22 APU substrate decreases with the growth of the oxide scale. The interfacial strength of the oxide scale and spinel coating is much higher than that of the oxide scale and Crofer 22 APU substrate. With the spinel coating, the predicted life of the Crofer 22 APU is significantly longer than that of the uncoated Crofer 22 APU.

Liu, Wenning N.; Sun, Xin; Stephens, Elizabeth V.; Khaleel, Mohammad A.

2009-04-15T23:59:59.000Z

414

Evaluation of a Surface Treatment on the Performance of Stainless Steels for SOFC Interconnect Applications  

SciTech Connect (OSTI)

Pack cementation-like Cerium based surface treatments have been found to be effective in enhancing the oxidation resistance of ferritic steels (Crofer 22APU) for solid oxide fuel cell (SOFC) applications. The application of either a CeN- or CeO2 based surface treatment results in a decrease in weight gain by a factor of three after 4000 hours exposure to air+3%H2O at 800oC. Similar oxide scales formed on treated and untreated surfaces, with a continuous Cr-Mn outer oxide layer and a continuous inner Cr2O3 layer formed on the surface. However, the thickness of the scales, and the amount of internal oxidation were significantly reduced with the treatment, leading to the decrease in oxidation rate. This presentation will detail the influence of the treatment on the electrical properties of the interconnect. Half-cell experiments (LSM cathode sandwiched between two steel interconnects) and full SOFC button cell experiments were run with treated and untreated interconnects. Preliminary results indicate the Ce treatment can improve SOFC performance.

Alman, D.E.; Holcomb, Adler, T.A.; G.R.; Wilson, R.D.; Jablonski, P.D.

2007-04-01T23:59:59.000Z

415

Feasibility studies of a power interconnection system for Central American countries: SIEPAC project  

SciTech Connect (OSTI)

The electrical systems of the Central American countries are linked by 230 kV ac weak border interconnections forming two separated subsystems. The first one includes Guatemala and El Salvador, and the other one comprises the systems of Honduras, Nicaragua, Costa Rica, and Panama. As a consequence, unrestricted energy exchanges among all countries are not possible. This article describes the SIEPAC project which consists of a 1,678 km long 500 kV ac power transmission line that would link the six electrical systems of the region through seven power substations (one for each country and two in Panama), installed close to the highest demand national centers and six control centers of energy (one for each country) to allow coordinated operation of the interconnection.This project also considers a set of complementary assets (230 ac power transmission lines into some countries and the border transmission line between El Salvador and Honduras, and various other equipment). The power transmission line will greatly reinforce the actual border interconnections, which have a reduced capacity of exchange and technical problems associated with the stability of a weak longitudinal system. On the other hand, economic savings for the region would be achieved, coming from a higher coordination level in the operation and planning of their systems.

Gomez, T.; Enamorado, J.C. (Univ. Pontificia Comillas, Madrid (Spain). Inst. de Investigacion Tecnologica); Vela, A. (Empresa Nacional de Electricidad, Madrid (Spain))

1994-06-01T23:59:59.000Z

416

Low-power approaches for parallel, free-space photonic interconnects  

SciTech Connect (OSTI)

Future advances in the application of photonic interconnects will involve the insertion of parallel-channel links into Multi-Chip Modules (MCMS) and board-level parallel connections. Such applications will drive photonic link components into more compact forms that consume far less power than traditional telecommunication data links. These will make use of new device-level technologies such as vertical cavity surface-emitting lasers and special low-power parallel photoreceiver circuits. Depending on the application, these device technologies will often be monolithically integrated to reduce the amount of board or module real estate required by the photonics. Highly parallel MCM and board-level applications will also require simplified drive circuitry, lower cost, and higher reliability than has been demonstrated in photonic and optoelectronic technologies. An example is found in two-dimensional point-to-point array interconnects for MCM stacking. These interconnects are based on high-efficiency Vertical Cavity Surface Emitting Lasers (VCSELs), Heterojunction Bipolar Transistor (HBT) photoreceivers, integrated micro-optics, and MCM-compatible packaging techniques. Individual channels have been demonstrated at 100 Mb/s, operating with a direct 3.3V CMOS electronic interface while using 45 mW of electrical power. These results demonstrate how optoelectronic device technologies can be optimized for low-power parallel link applications.

Carson, R.F.; Lovejoy, M.L.; Lear, K.L.; WSarren, M.E.; Seigal, P.K.; Craft, D.C.; Kilcoyne, S.P.; Patrizi, G.A.; Blum, O.

1995-12-31T23:59:59.000Z

417

File:PUCT DG Interconnection Manual.pdf | Open Energy Information  

Open Energy Info (EERE)

PUCT DG Interconnection Manual.pdf PUCT DG Interconnection Manual.pdf Jump to: navigation, search File File history File usage Metadata File:PUCT DG Interconnection Manual.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 2.02 MB, MIME type: application/pdf, 114 pages) File history Click on a date/time to view the file as it appeared at that time.

418

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

Sierra Nevada Region Sierra Nevada Region Categorical Exclusion Determinations: Western Area Power Administration-Sierra Nevada Region Categorical Exclusion Determinations issued by Western Area Power Administration-Sierra Nevada Region. DOCUMENTS AVAILABLE FOR DOWNLOAD July 3, 2013 CX-010684: Categorical Exclusion Determination Cottonwood-Roseville Optical Groundwire Project CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region September 15, 2011 CX-006896: Categorical Exclusion Determination Maxwell - O'Banion Optical Ground Wire CX(s) Applied: B1.7, B4.6, B4.7, B4.11 Date: 09/15/2011 Location(s): Sutter County, California Office(s): Western Area Power Administration-Sierra Nevada Region, National

419

EIA - Natural Gas Pipeline System - Western Region  

U.S. Energy Information Administration (EIA) Indexed Site

Western Region Western Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipelines in the Western Region Overview | Transportation South | Transportation North | Regional Pipeline Companies & Links Overview Ten interstate and nine intrastate natural gas pipeline companies provide transportation services to and within the Western Region (Arizona, California, Idaho, Nevada, Oregon, and Washington), the fewest number serving any region (see Table below). Slightly more than half the capacity entering the region is on natural gas pipeline systems that carry natural gas from the Rocky Mountain area and the Permian and San Juan basins. These latter systems enter the region at the New Mexico-Arizona and Nevada-Utah State lines. The rest of the capacity arrives on natural gas pipelines that access Canadian natural gas at the Idaho and Washington State border crossings with British Columbia, Canada.

420

Case Western University (Vestas) | Open Energy Information  

Open Energy Info (EERE)

University (Vestas) University (Vestas) Jump to: navigation, search Name Case Western University (Vestas) Facility Case Western University (Vestas) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Case Western University Developer Case Western University Energy Purchaser Sopko & Sons - excess to First Energy Location Euclid OH Coordinates 41.60216607°, -81.49763346° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.60216607,"lon":-81.49763346,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Case Western University (Nordex) | Open Energy Information  

Open Energy Info (EERE)

University (Nordex) University (Nordex) Jump to: navigation, search Name Case Western University (Nordex) Facility Case Western University (Nordex) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Case Western University Developer Case Western University Energy Purchaser Stamco Inc - excess to First Energy Location Euclid OH Coordinates 41.60213398°, -81.49688244° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.60213398,"lon":-81.49688244,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

422

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

Colorado River Storage Project Management Center Colorado River Storage Project Management Center Categorical Exclusion Determinations: Western Area Power Administration-Colorado River Storage Project Management Center Categorical Exclusion Determinations issued by Western Area Power Administration-Colorado River Storage Project Management Center. DOCUMENTS AVAILABLE FOR DOWNLOAD January 25, 2011 CX-005545: Categorical Exclusion Determination Installation of Metering and Circuit Breaker at Powell 69-Kilovolt Substation CX(s) Applied: B4.11 Date: 01/25/2011 Location(s): Page, Arizona Office(s): Western Area Power Administration-Colorado River Storage Project Management Center October 26, 2009 CX-005544: Categorical Exclusion Determination Power Rate Formula for the Provo River Project of the Western Area Power

423

Western Electricity Coordinating | OpenEI  

Open Energy Info (EERE)

Western Electricity Coordinating Western Electricity Coordinating Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 117, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords AEO California EIA Renewable Energy Generation Western Electricity Coordinating Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - Western Electricity Coordinating Council / California (xls, 119.2 KiB) Quality Metrics Level of Review Peer Reviewed

424

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

Upper Great Plains Region Upper Great Plains Region Categorical Exclusion Determinations: Western Area Power Administration-Upper Great Plains Region Categorical Exclusion Determinations issued by Western Area Power Administration-Upper Great Plains Region. DOCUMENTS AVAILABLE FOR DOWNLOAD March 22, 2013 CX-010553: Categorical Exclusion Determination Appledorn Substation Construction CX(s) Applied: B4.11 Date: 03/22/2010 Location(s): Minnesota Offices(s): Western Area Power Administration-Upper Great Plains Region December 3, 2012 CX-009534: Categorical Exclusion Determination Construct New Transmission Line and Footings, Garrison Switchyard CX(s) Applied: B4.13 Date: 12/03/2012 Location(s): North Dakota Offices(s): Western Area Power Administration-Upper Great Plains Region October 11, 2011

425

Competitive interstate taxation of western coal  

SciTech Connect (OSTI)

This paper analyzes the potential market power of western states in setting coal severance taxes. An attempt to determine the emphasis placed by the western states on the development of their coal resources is also made. Three market structures are analyzed. One involves a western regional cartel, setting taxes collectively. The other cases are noncooperative tax equilibria with Montana and Wyoming competing against each other. We study the effects on these equilibria of changes in each region's relative emphasis on development of coal resources vs tax revenue. The welfare impacts of these tax setting policies are also addressed. The analysis is based on an activity analysis of US coal markets. The results show that the taxes associated with the noncooperative competitive tax equilibria are close to present tax levels. Additionally, we conclude that western states currently are quite efficient extractors of economic rent from coal produced within their boundaries, in terms of welfare loss per dollar of tax revenue collected. 2 figures.

Kolstad, C.D.; Wolak, F.A. Jr.

1983-01-01T23:59:59.000Z

426

Western Electricity Coordinating Council | Open Energy Information  

Open Energy Info (EERE)

Electricity Coordinating Council Place: Salt Lake City, UT References: SGIC1 This article is a stub. You can help OpenEI by expanding it. Western Electricity Coordinating Council...

427

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

Desert Southwest Region Desert Southwest Region Categorical Exclusion Determinations: Western Area Power Administration-Desert Southwest Region Categorical Exclusion Determinations issued by Western Area Power Administration-Desert Southwest Region. DOCUMENTS AVAILABLE FOR DOWNLOAD August 22, 2013 CX-010882: Categorical Exclusion Determination Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region August 12, 2013 CX-010883: Categorical Exclusion Determination PHX-LOB and LIB-LOB 230-Kilovolt Double-Circuit- Replace Insulators at Structure No. 28-2 With NCI Type Polymers CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

428

High-speed graphene interconnects monolithically integrated with CMOS ring oscillators operating at 1.3GHz  

E-Print Network [OSTI]

We have successfully experimentally integrated graphene interconnects with commercial 0.25 ¿m technology CMOS ring oscillator circuit using conventional fabrication techniques, and demonstrated high speed on-chip graphene ...

Chen, Xiangyu

429

Metallic Interconnects for Solid Oxide Fuel Cell: Performance of Reactive Element Oxide Coating During 10, 20 and 30Months Exposure  

Science Journals Connector (OSTI)

One of challenges in improving the performance and cost-effectiveness of SOFCs (Solid Oxide Fuel Cells) is the development of suitable interconnect materials. Chromia-forming alloys and especially ferritic sta...

S. Fontana; S. Chevalier; G. Caboche

2012-12-01T23:59:59.000Z

430

Development of Ni1-xCoxO as the cathode/interconnect contact for solid oxide fuel cells  

SciTech Connect (OSTI)

A new type of material, Ni1-xCoxO, was developed for solid oxide fuel cell (SOFC) cathode/interconnect contact applications. The phase structure, coefficient of thermal expansion, sintering behavior, electrical property, and mechanical bonding strength of these materials were evaluated against the requirements of the SOFC cathode/interconnect contact. A dense cathode/interconnect contact layer was developed through reaction sintering from Ni and Co metal powders. An area specific resistance (ASR) as low as 5.5 mohm.cm2 was observed after 1000 h exposure in air at 800 C for the LSM/Ni0.33Co0.67O/AISI441 assembly. Average mechanical strengths of 6.8 and 5.0 MPa were obtained for the cathode/contact/cathode and interconnect/contact/interconnect structures, respectively. The significantly low ASR was probably due to the dense structure and therefore improved electrical conductivity of the Ni0.33Co0.67O contact and the good bonding of the interfaces between the contact and the cathode, and between the contact and the interconnect.

Lu, Zigui; Xia, Guanguang; Templeton, Joshua D.; Li, Xiaohong S.; Nie, Zimin; Yang, Zhenguo; Stevenson, Jeffry W.

2011-06-01T23:59:59.000Z

431

The Siwaliks of western Nepal I. Geometry and kinematics  

E-Print Network [OSTI]

The Siwaliks of western Nepal I. Geometry and kinematics J.L. Mugniera, *, P. Leturmya , G. Masclea-western Nepal, and beneath 14.6 Ma sediments in mid-western Nepal, i.e., above the base of the Siwalik Group. Unconformities have been observed in the upper Siwalik member of western Nepal both on satellite images

Husson, Laurent

432

Mixed-mode singularity and temperature effects on dislocation nucleation in strained interconnects  

SciTech Connect (OSTI)

Dislocations can be nucleated from sharp geometric features in strained interconnects due to thermal expansion coefficient mismatch, lattice mismatch, or stresses that arise during material processing. The asymptotic stress fields near the edge root can be described by mixed-mode singularities, which depend on the dihedral angle and material properties, and a transverse T-stress, which depends on how residual stress is realized in the interconnects. The critical condition for stress nucleation can be determined when an appropriate measure of the stress intensity factors (SIFs) reaches a critical value. Such a method, however, does not offer an explicit picture of the dislocation nucleation process so that it has difficulties in studying complicated structures, mode mixity effects, and more importantly the temperature effects. Based on the Peierls concept, a dislocation can be described by a continuous slip field, and the dislocation nucleation condition corresponds when the total potential energy reaches a stationary state. Through implementing this ad hoc interface model into a finite element framework, it is found that dislocation nucleation becomes more difficult with the increase of mode mixity and T-stress, or the decrease of the width-to-height ratio of the surface pad, while the shape of the surface pad, being a square or a long line, plays a less important role. The Peierls dislocation model also allows us to determine the activation energy, which is the energy needed for the thermal activation of a dislocation when the applied load is lower than the athermal critical value. The calculated saddle point configuration compares favorably the molecular simulations in literature. Suggestions on making immortal strained interconnects are provided.

Lee, Jinhaeng [University of Tennessee, Knoxville (UTK); Gao, Yanfei [ORNL

2011-01-01T23:59:59.000Z

433

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

March 29, 2012 March 29, 2012 CX-008407: Categorical Exclusion Determination Terry Ranch Road Substation CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008403: Categorical Exclusion Determination Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008399: Categorical Exclusion Determination Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

434

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

November 23, 2010 November 23, 2010 CX-004887: Categorical Exclusion Determination Cable and Conduit Addition Within the Fenced Area of the Buck Boulevard Substation CX(s) Applied: B4.6 Date: 11/23/2010 Location(s): Riverside County, California Office(s): Western Area Power Administration-Desert Southwest Region November 23, 2010 CX-007129: Categorical Exclusion Determination Buck Boulevard Substation CX(s) Applied: B4.6 Date: 11/23/2010 Location(s): Ripley, California Office(s): Western Area Power Administration-Desert Southwest Region November 5, 2010 CX-004898: Categorical Exclusion Determination Gila-Wellton-Mohawk (Structure Maintenance) CX(s) Applied: B1.3 Date: 11/05/2010 Location(s): Yuma County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

435

Case Western University | Open Energy Information  

Open Energy Info (EERE)

University University Facility Case Western University Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Case Western University Energy Purchaser Case Western University Location Cleveland OH Coordinates 41.50239055°, -81.60550386° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.50239055,"lon":-81.60550386,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

436

Western Massachusetts Electric - Commercial Energy Efficiency Rebates |  

Broader source: Energy.gov (indexed) [DOE]

Western Massachusetts Electric - Commercial Energy Efficiency Western Massachusetts Electric - Commercial Energy Efficiency Rebates Western Massachusetts Electric - Commercial Energy Efficiency Rebates < Back Eligibility Commercial Industrial Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Heating Heat Pumps Appliances & Electronics Commercial Lighting Lighting Maximum Rebate Pre-approval required for rebates greater than $5,000 Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Small Business Program: up to 70% of cost, zero percent financing on remainder Custom: based on energy savings Retrofit Pay-for-Performance Incentive: $0.75/kWh or therm saved Lighting: Varies, see program web site Vending Machine Controls: $45 - $115 Variable Speed Drive (Retrofit): $2,550 - $10,500

437

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

December 16, 2009 December 16, 2009 CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region December 2, 2009 CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region November 16, 2009 CX-000554: Categorical Exclusion Determination Ogallala Substation KY1A Transformer Replacement CX(s) Applied: B4.6 Date: 11/16/2009 Location(s): Ogallala, Nebraska Office(s): Western Area Power Administration-Rocky Mountain Region

438

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

May 2, 2011 May 2, 2011 CX-007145: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade Amendment CX(s) Applied: B1.3 Date: 05/02/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region April 28, 2011 CX-007144: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade Amendment CX(s) Applied: B1.3 Date: 04/28/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region April 28, 2011 CX-007132: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade Amendment CX(s) Applied: B4.13 Date: 04/28/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

439

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

March 11, 2010 March 11, 2010 CX-007156: Categorical Exclusion Determination New Waddell-Raceway-Westwing Structure Replacement CX(s) Applied: B4.6, B4.13 Date: 03/11/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region February 18, 2010 CX-007167: Categorical Exclusion Determination Rogers-Coolidge Danger Tree Removal CX(s) Applied: B1.3 Date: 02/18/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region December 31, 2009 CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

440

Western Greenbrier Co-Production Demonstration Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

contacts contacts Brad tomer Director Office of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov nelson Rekos Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4066 nelson.rekos@netl.doe.gov PaRtIcIPant Western Greenbrier Co-Generation, LLC Lewisburg, WV Western Greenbrier Co-ProduCtion demonstration ProjeCt (disContinued) Project Description The Western Greenbrier Co-Production (WGC) project will generate about 100 megawatts of electricity and commercial quantities of salable ash by-products by burning waste coal presently contained in numerous coal refuse dumps in the vicinity of the plant. These refuse dumps, created by coal cleaning operations over

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

2012 Annual Report [WESTERN AREA POWER ADMINISTRATION  

SciTech Connect (OSTI)

Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chus memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIPs flagship projectthe Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

none,

2012-01-01T23:59:59.000Z

442

Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Workshop December 8, 2011 Hilton St. Louis Airport, 10330 Natural Bridge Road, St. Louis, Missouri 63134 Presented by: Jerry Lein Public Utility Analyst North Dakota Public Service Commission Phone: 701 328-1035 Fax: 701 328-2410 jlein@nd.gov Overview * ND Electric Energy Resources * Need for New Transmission - Interconnection Difficulties - Transmission Constraints * Regional Transmission Projects Update * Capacity Deliverability between RTOs ND Electric Energy Resources * ND Ranked #1 in U.S. for Wind Energy Potential - 1991 Pacific Northwest Labs study found ND Wind could potentially supply 36% of U.S. electric energy consumption. -

443

A new relay for interconnected distribution in the UK -- Design and field experience  

SciTech Connect (OSTI)

The design of a new microprocessor based multifunctional relay for use on interconnected 33 kV circuits is described. The relay uses sequence component principles and rented low grade VF communication. It was needed urgently because rented metallic communication circuits, which are in widespread use, are being withdrawn in the UK. The relay development is unusual because of its measurement methods and because it can derive polarizing voltage from existing 11 kV VTs. The time scales required were such that development, field trials and installation phases overlapped. The field experience is described.

Sanderson, J.V.H.; Kyriakides, M.K. (Power Engineering Consultants Ltd., Cheshire (United Kingdom)); An, W. (UMIST, Manchester (United Kingdom)); Mackrell, A.J.; Postlethwaite, H.R.; Rogers, W.J.S.; Swinnerton, B.W. (Manweb plc, Chester (United Kingdom))

1994-01-01T23:59:59.000Z

444

Laser-welded Interconnection of Screen-printed Si Solar Cells  

Science Journals Connector (OSTI)

Abstract We demonstrate the laser welding of Al interconnects to the BSF rear-side of screen-printed two-side-contacted solar cells. The Al paste on the rear side of solar cell is laser-welded to an Al foil. This reduces the silver consumption of the solar cells by making silver pads on the rear side obsolete. Our proof-of-concept modules are free of laser damage. A 3-cell-module from 6 solar cells shows no change in fill factor within the statistical measurement uncertainty after artificial aging in 500 humidity-freeze cycles.

Henning Schulte-Huxel; Susanne Blankemeyer; Verena Steckenreiter; Sarah Kajari-Schroeder; Rolf Brendel

2014-01-01T23:59:59.000Z

445

Performance-aware Energy Saving Mechanism in Interconnection Networks for Parallel Systems  

Science Journals Connector (OSTI)

Abstract The growing processing power of parallel computing systems require interconnection networks a higher level of complexity and higher performance, thus consuming more energy. Link components contributes a substantial proportion of the total energy consumption of the networks. Many researchers have proposed approaches to judiciously change the link speed as a function of traffic to save energy when the traffic is light. However, the link speed reduction incurs an increase in average packet latency, thus degrades network performance. This paper addresses that issue with a performance-aware energy saving mechanism. The simulation results show that the proposed mechanism outperforms the energy saving mechanisms in literature.

Hai Nguyen; Daniel Franco; Emilio Luque

2014-01-01T23:59:59.000Z

446

Viscosity solutions of systems of PDEs with interconnected obstacles and Multi modes switching problems  

E-Print Network [OSTI]

This paper deals with existence and uniqueness, in viscosity sense, of a solution for a system of m variational partial differential inequalities with inter-connected obstacles. A particular case of this system is the deterministic version of the Verification Theorem of the Markovian optimal m-states switching problem. The switching cost functions are arbitrary. This problem is connected with the valuation of a power plant in the energy market. The main tool is the notion of systems of reflected BSDEs with oblique reflection.

Hamadne, Said

2011-01-01T23:59:59.000Z

447

Monolithic interconnected module with a tunnel junction for enhanced electrical and optical performance  

DOE Patents [OSTI]

An improved thermophotovoltaic (TPV) n/p/n device is provided. Monolithic Interconnected Modules (MIMS), semiconductor devices converting infrared radiation to electricity, have been developed with improved electrical and optical performance. The structure is an n-type emitter on a p-type base with an n-type lateral conduction layer. The incorporation of a tunnel junction and the reduction in the amount of p-type material used results in negligible parasitic absorption, decreased series resistance, increased voltage and increased active area. The novel use of a tunnel junction results in the potential for a TPV device with efficiency greater than 24%.

Murray, Christopher S. (Bethel Park, PA); Wilt, David M. (Bay Village, OH)

2000-01-01T23:59:59.000Z

448

of Western Area Power Administration's Cyber Security Program  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Western Area Power Administration's Cyber Security Program DOE/IG-0873 October 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 October 22, 2012 MEMORANDUM FOR THE UNDER SECRETARY OF ENERGY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Western Area Power Administration's Cyber Security Program" INTRODUCTION AND OBJECTIVE The Department of Energy's Western Area Power Administration (Western) markets and delivers hydroelectric power and related services to 15 states within the central and western United States. As the largest U.S. Power Marketing Administration, millions of households and

449

Three-dimensional CFD simulation of hydrodynamics in an interconnected fluidized bed for chemical looping combustion  

Science Journals Connector (OSTI)

Abstract A hydrodynamic model of an interconnected fluidized bed for chemical looping combustion was established based on the EulerianEulerian two-fluid model with the kinetic theory of granular flow. The effect of the drag model on the computational results was investigated and detailed hydrodynamics were predicted in the three-dimensional circulating fluidized bed (composed of a riser, bubbling bed, pot-seal and cyclone). Both qualitative and quantitative results indicated that the drag model had a significant effect on the flow behavior. The Gidaspow and the Syamlal & O'Brien drag models both produced accurate predictions in this study. The pressure balance of an interconnected fluidized bed revealed that the pressure in the bubbling bed was lower than that in the pot-seal and the riser, whilst still being higher than the pressure in the cyclone. The riser and bubbling bed were individually operated in fast and bubbling fluidization regions. The three distinct regions identified from the bottom to the top of the riser were: entrance region, bulk region and exit region. The solids volume fraction was higher in the near-wall region but lower in the center region for both the riser and bubbling bed. The coupled characteristics of the fluidized bed were predominantly identified by the strong effect of operational gas velocity in the riser on the hydrodynamics in the bubbling bed.

Yanjun Guan; Jian Chang; Kai Zhang; Baodong Wang; Qi Sun

2014-01-01T23:59:59.000Z

450

Developing TiAIN Coatings for Intermediate Temperature-Solid Oxide Fuel Cell Interconnect Applications  

SciTech Connect (OSTI)

TiN-type coatings have potential to be used as SOFC interconnect coatings SOFC because of their low resistance and high temperature stability. In this research, various (Ti,Al)N coatings were deposited on stainless steels by filtered-arc method. ASR and XRD tests were conducted on these coatings, and SEM/EDAX analysis were conducted after ASR and XRD tests. SEM/EDAX analyses show that (Ti,Al)N remains stable at temperature up to 700C. It is also indicated that Al has beneficial effect on the stability of TiN type coatings. At 900C, (Ti-30Al)N is fully oxidized and some of (Ti-50Al)N coating still remains as nitride. The analyses on cross-sectional samples show that these coatings are effective barrier to the Cr migration. In summary, (Ti.Al)N coatings are good candidates for the SOFC interconnect applications at 700C. The future directions of this research are to improve the stability of these coatings by alloy-doping and to develop multi-layer coatings.

Liu, X. (West Virginia University); Johnson, C.D.; Li, C. (West Virginia University); Xu, J. (West Virginia University); Cross, C.

2007-02-01T23:59:59.000Z

451

Electrodeposition of Mn-Co Alloys on Stainless Steels for SOFC Interconnect Application  

SciTech Connect (OSTI)

Chromium-containing ferritic stainless steels are the most popular materials for solid oxide fuel cell (SOFC) interconnect applications because of its oxidation resistance and easy fabrication process. However, excessive scale growth and chromium evaporation will degrade the cell performance. Highly conductive coatings that resist oxide scale growth and chromium evaporation may prevent both of these problems. Mn1.5Co1.5O4 spinel is one of the most promising coatings for interconnect application because of its high conducitivy, good chromium retention capability, as well as good CTE match. Electroplating of alloys or thin film multilayers followed by controlled oxidation to the desired spinel phase offers an additional deposition option. In the present study binary Mn/Co alloys was fabricated by electrodeposition, and polarization curves were used to characterize the cathodic reactions on substrate surface. By controlling the current density precisely, coatings with Mn/Co around 1:1 has been successfully deposited in Mn/Co =10 solutions, SEM and EDX was used to characterize the surface morphology and composition.

Wu, J. (West Virginia University); Jiang, Y. (West Virginia University); Johnson, C.; Gong, M. (West Virginia University); Liu, X. (West Virginia University)

2007-09-01T23:59:59.000Z

452

Fostering interconnectivity dimension of low-carbon cities: The triple bottom line re-interpretation  

Science Journals Connector (OSTI)

In facilitating the progress towards low-carbon cities, there is no lack of available green technologies, planning techniques, economic tools, social development strategies, etc. These technologies, strategies and techniques have, in fact, long been deployed in many cities and communities around the world. However, the outcomes have been somewhat slow and less than expected. This is also manifested in the lower-than-expectation outcomes of the formation of a meaningful global climate change treaty so far. The barriers have clearly been unveiled as disconnection among the triple bottom lines (TBL) in the approach. By linking the concept of low-carbon cities to sustainable development (informed by the TBL), the paper highlights the implication of misinterpretation of a popular TBL diagram, leading to fragmented, compromised approach to LCC. Cases in point are isolating and excluding social and economic activities that are not environmental friendly, and trading-off environmentally-friendly activities that are notprofitable in economic sense. Re-interpretation the popular TBL diagram literally from a three-dimensional lens offers an alternative approach, presented in an integrated framework towards low-carbon cities. The vital factors in the framework are safeguarding the positive dynamic interconnectivities of the three bottom lines, aligning their core values (in contrast to the isolating and excluding exercise), amplifying their common interest (instead of trading-off activities), and deploying strategies from planning, renewable technologies, education and policy making to address multiple and interconnected issues reciprocally.

Wynn Chi Nguyen Cam

2013-01-01T23:59:59.000Z

453

Mass Wasting in the Western Galapagos Islands  

E-Print Network [OSTI]

. RESULTS .............................................................................................................. 12 3.1 Cerro Azul Region ........................................................................................ 20 3.2 Le Cumbre... of the western Galapagos Islands ......................................................................... 7 3 Map of the Galapagos Islands with locations of Figures 4-33 ................... 11 4 Cerro Azul sidescan sonar data interpreted...

Hall, Hillary

2012-10-19T23:59:59.000Z

454

Case Western Reserve University Chart of Accounts  

E-Print Network [OSTI]

of the following: ANN LON CIP OPR CSR OSA END PLT FHB RES INC SPC INS TRN All other SpeedTypes will populate 102330 Non-Govt Construction 102340 Non-Govt CIP Movable Equipment 102350 Govt Construction 102360 Govt CIP Movable Equip 102370 CIP - Site Preparation 102371 CIP Surveying #12;Case Western Reserve

Rollins, Andrew M.

455

PENSION INVESTMENT CHANGE FORM Western University  

E-Print Network [OSTI]

PENSION INVESTMENT CHANGE FORM Western University PLEASE COMPLETE ALL SECTIONS OF THIS FORM This form is used to make all investment changes, except to reallocate holdings from the Liquidating Trust Fund. If you wish to make an investment change to reallocate your Liquidating Trust Fund holdings

Sinnamon, Gordon J.

456

Regional Summary Western Pacific Management Context  

E-Print Network [OSTI]

-central and eastern Pacific Ocean) total of Pacific bigeye tuna landings reported in 2009. Currently (WCPFC) is active in the western and central Pacific Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean. Species under the purview of the WCPFC and IATTC

457

Regional Summary Western Pacific Management Context  

E-Print Network [OSTI]

.5 million pounds) of the Pacific-wide (western-central and eastern Pacific Ocean) total of Pacific bigeye Ocean and the Inter-American Tropical Tuna Commission (IATTC) is active in the eastern Pacific Ocean coordinated management between countries with fishing interests in the Pacific Ocean. The annual bigeye tuna

458

PROJECT REPORT WESTERN COOLING CHALLENGE LABORATORY  

E-Print Network [OSTI]

that reduce energy, water consumption and peak electricity demand associated with cooling in the Western-cool- er to reduce the refrigerant condensing temperature of a vapor compression system, then cycles Davis Energy Efficiency Center in 2007 through a grant from the California Clean Energy Fund

California at Davis, University of

459

WWU Sustainability Academy Western Washington University  

E-Print Network [OSTI]

WWU Sustainability Academy Western Washington University Dear colleagues, We cordially extend to you this invitation to join the WWU Sustainability Academy! Following several years of discussion, a group of faculty has started the (tentatively named) "WWU Sustainability Academy." Our goal is to build

Zaferatos, Nicholas C.

460

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343) (08/20/04)  

Broader source: Energy.gov (indexed) [DOE]

COB Energy Facility COB Energy Facility DECISION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the COB Energy Facility with the Federal Columbia River Transmission System (FCRTS), as proposed in the COB Energy Facility Final Environmental Impact Statement (FEIS) (DOE/EIS-0343, June 2004). Proposed by Peoples Energy Resources Company (PERC), the COB Energy Facility involves constructing and operating a new 1,160- megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 50.6-acre site near Bonanza in Klamath County, Oregon, and a 7.2-mile-long 500-kilovolt (kV) transmission line south to BPA's Captain Jack Substation. A Generation Interconnection Agreement with PERC would provide for interconnection of the COB Energy Facility with the FCRTS and

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Audit Report - Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009 OAS-RA-13-26 June 2013 Department of Energy Washington, DC 20585 June 19, 2013 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY FROM: Rickey R. Hass Deputy Inspector General for Audit and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009" BACKGROUND Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of

462

Coolerado 5 Ton RTU Performance: Western Cooling Challenge Results (Revised)  

SciTech Connect (OSTI)

The Western Cooling Efficiency Center (WCEC) developed a set of criteria for test conditions, minimum energy, and water use performance for prototype cooling equipment and identified these conditions as indicative of western state climates.

Kozubal, E.; Slayzak, S.

2010-11-01T23:59:59.000Z

463

Western New York Nuclear Service Center: History | Department...  

Office of Environmental Management (EM)

History Western New York Nuclear Service Center: History Presentation made by Paul J. Bembia for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY Western New York...

464

VEE-0040- In the Matter of Western Star Propane, Inc.  

Broader source: Energy.gov [DOE]

On February 18, 1997, Western Star Propane, Inc. (Western) filed an Application for Exception with the Office of Hearings and Appeals (OHA) of the Department of Energy (DOE). In its application,...

465

Western States Coalbed Methane Production (Billion Cubic Feet...  

Gasoline and Diesel Fuel Update (EIA)

Western States Coalbed Methane Production (Billion Cubic Feet) Western States Coalbed Methane Production (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5...

466

WESTERN GREAT PLAINS SHORTGRASS PRAIRIE extent exaggerated for display  

E-Print Network [OSTI]

of the Western Great Plains, east of the Rocky Mountains and ranges from the Nebraska Panhandle south into Texas primarily on flat to rolling uplands with loamy, ustic soils ranging from sandy to clayey. WESTERN GREAT

467

2012 Annual Planning Summary for Western Area Power Administration  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Western Area Power Administration.

468

2014 Annual Planning Summary for the Western Area Power Administration  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Western Area Power Administration.

469

A Conservation Blueprint for Neotropical Migratory Birds in Western Colorado  

E-Print Network [OSTI]

A Conservation Blueprint for Neotropical Migratory Birds in Western Colorado Michelle Fink, David and conifer forests in western Colorado. Twenty-two forest-based bird species were used as conservation opportunities for conservation of Neotropical migratory birds in coniferous and aspen forest habitats in Western

470

NorthWestern Energy Community Works Scholarship for Electrical Engineering  

E-Print Network [OSTI]

20121204 NorthWestern Energy Community Works Scholarship for Electrical Engineering A special new Electrical Engineering, NorthWestern Energy has established a scholarship program administered by the Montana. NorthWestern Energy is an investor-owned utility and one of the largest providers of electricity

Lawrence, Rick L.

471

NorthWestern Energy Community Works Scholarship for Electrical Engineering  

E-Print Network [OSTI]

20131030 NorthWestern Energy Community Works Scholarship for Electrical Engineering A special Electrical Engineering, NorthWestern Energy has established a scholarship program administered by the Montana. NorthWestern Energy is an investor-owned utility and one of the largest providers of electricity

Dyer, Bill

472

Post-Emergence Behavior of Hatchling Western Pond Turtles  

E-Print Network [OSTI]

Post-Emergence Behavior of Hatchling Western Pond Turtles www.oregonwildlife.org #12;2 Post-Emergence Behavior of Hatchling Western Pond Turtles Final Report August 2010 Daniel K. Rosenberg Oregon Wildlife: Rosenberg, D. K. and R. Swift. 2010. Post-emergence behavior of hatchling western pond turtles. Oregon

Rosenberg, Daniel K.

473

Interaction between (La, Sr)MnO3 cathode and NiMoCr metallic interconnect with suppressed chromium vaporization for solid oxide fuel cells  

Science Journals Connector (OSTI)

Interaction between (La0.8Sr0.2)0.90MnO3 (LSM) cathode and newly developed NiMoCr metallic interconnect is investigated at 900C under operation conditions of solid oxide fuel cells (SOFCs). The results show that chromium deposition on the LSM cathodes in the presence of NiMoCr interconnect is remarkably reduced as compared to that in the presence of a conventional FeCr metallic interconnect (RA446). In contact with the NiMo-Cr interconnect the overpotential, ?, for the O2 reduction reaction on LSM cathode decreased from 529 to 111mV during the 1200min current passage at 200mA/cm2. In contrast, ? increased from 464 to 561mV for the reaction in the presence of a RA446 interconnect. The decrease in ? clearly indicates that chromium poisoning effect of the NiMoCr interconnect is also significantly suppressed as compared to that with conventional FeCr interconnect materials. The suppressed Cr deposition and poisoning effects observed on the LSM cathodes demonstrate promising potential of the NiMoCr alloy as new interconnect materials with significant suppressed chromium vaporization and deposition for SOFCs.

Xinbing Chen; Bin Hua; Jian Pu; Jian Li; Lan Zhang; San Ping Jiang

2009-01-01T23:59:59.000Z

474

A G LO BA L P OW E R TECHNOLO GIES CO M PA N Y SolarTieTM Grid Interconnection Solution  

E-Print Network [OSTI]

G f· Shipments to date sufficient to power 10 GW of wind power SWind Plant Interconnection Solutions's Wind-Generated Electricity "Powered by AMSC®" Wind Turbine Designs, Controls & Converters · Relied upon utilized at more than 70 wind plants worldwide · Shipments to date sufficient to allow interconnection 4 p

Homes, Christopher C.

475

Electrical and Optical On-Chip Interconnects in Scaled Microprocessors Guoqing Chen, Hui Chen, Mikhail Haurylau, Nicholas Nelson, David Albonesi, Philippe M. Fauchet, and Eby G. Friedman  

E-Print Network [OSTI]

Electrical and Optical On-Chip Interconnects in Scaled Microprocessors Guoqing Chen, Hui Chen of Electrical and Computer Engineering University of Rochester, Rochester, New York, 14627 Department of Electrical and Computer Engineering Cornell University, Ithaca, New York, 14853 Abstract-- Interconnect has

Albonesi, David H.

476

1068 IEEE TRANSACTIONS ON VERY LARGE SCALE INTEGRATION (VLSI) SYSTEMS, VOL. 11, NO. 6, DECEMBER 2003 Equivalent-Circuit Interconnect Modeling Based on  

E-Print Network [OSTI]

-chip long interconnects that are represented as distributed RLC transmission lines. The proposed delay model transmission line model, equivalent circuit, interconnect modeling, passivity, transient simulation. I as distributed RLC transmission lines. Manuscript received December 3, 2002. This work was supported in part

Mazumder, Pinaki

477

Western Resource Advocates | Open Energy Information  

Open Energy Info (EERE)

Advocates Advocates Jump to: navigation, search Logo: Western Resource Advocates Name Western Resource Advocates Address 2260 Baseline Road Place Boulder, Colorado Zip 80302 Region Rockies Area Website http://www.westernresourceadvo Notes Non-profit environmental law and policy organization developing strategic programs in three areas: Water, Energy and Lands Coordinates 39.9998°, -105.264094° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.9998,"lon":-105.264094,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

478

Western Geothermal Partners | Open Energy Information  

Open Energy Info (EERE)

Western Geothermal Partners Western Geothermal Partners Place Reno, Nevada Zip 89509 Sector Geothermal energy Product A Reno-based geothermal development company Coordinates 32.944065°, -97.578279° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.944065,"lon":-97.578279,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

479

NorthWestern Energy | Open Energy Information  

Open Energy Info (EERE)

NorthWestern Energy NorthWestern Energy Place South Dakota Utility Id 13809 Utility Location Yes Ownership I NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COPS-70 (Controlled Off Peak Service) Commercial LGS-34 Commercial RS-10 Residential Rate 25 All-Inclusive Commercial Service Commercial Average Rates

480

Western Governors' Association | Open Energy Information  

Open Energy Info (EERE)

Governors' Association Governors' Association Jump to: navigation, search Logo: Western Governors' Association Name Western Governors' Association Address 1600 Broadway, Suite 1700 Place Denver, CO Zip 80202 Year founded 1984 Phone number (303) 623-9378 Website http://www.westgov.org/ Coordinates 39.7420789°, -104.987377° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7420789,"lon":-104.987377,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "interconnection ercot western" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

July 25, 2012 July 25, 2012 CX-008787: Categorical Exclusion Determination Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 23, 2012 CX-008784: Categorical Exclusion Determination License Outgrant to Owl Creek Water District Town of Thermopolis, Hot Springs County, Wyoming CX(s) Applied: B4.9 Date: 07/23/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region July 3, 2012 CX-008779: Categorical Exclusion Determination Curecanti-Poncha-Canon City West-Midway 230-Kilovolt Transmission Line Road Maintenance Gunnison, Chaffee, Fremont, Pueblo, and El Paso Counties, Colorado CX(s) Applied: B1.3

482

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

May 19, 2011 May 19, 2011 CX-005981: Categorical Exclusion Determination Curecanti Substation Containment Wall, Montrose County, Colorado CX(s) Applied: B1.6 Date: 05/19/2011 Location(s): Montrose County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 18, 2011 CX-005937: Categorical Exclusion Determination Boyd-Valley Transmission Line Optical Ground Wire Fiber Optic Installation, Larimer County, Colorado CX(s) Applied: B4.7 Date: 05/18/2011 Location(s): Larimer County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region May 17, 2011 CX-006244: Categorical Exclusion Determination Craig-Bears Ears-Hayden Substations Fiber Optic and Pole Installation, Moffat and Routt Counties, Colorado CX(s) Applied: B4.6, B4.7 Date: 05/17/2011

483

Western economies and the Gulf war  

SciTech Connect (OSTI)

A prolonged Iran/Iraq war could mean economic and even political-military disaster for western countries dependent on Persian Gulf oil. The percentage of gross national product loss that the US, western Europe, and Japan would suffer is estimated for three levels of interruption and illustrates how global effects can be felt even when direct imports are not involved. Although the US has few options for projecting power into the Gulf region, a long-run expansion of military capability is essential. The economic damage of continued disruptions can be eased by using more coal, nuclear power, and natural gas even if it means removing some environmental and economic barriers. A combination of financial incentives and additions to the strategic oil and gas storage would help, but important change will come from a reappraisal of our military position. (DCK)

Rowen, H.S.

1980-12-01T23:59:59.000Z

484

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

April 24, 2013 April 24, 2013 CX-010097: Categorical Exclusion Determination Herbicide Application at Lone Butte Substation During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/24/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 19, 2013 CX-010096: Categorical Exclusion Determination Herbicide Application at 36 Substations Located in Arizona and California During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/19/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 8, 2013 CX-010098: Categorical Exclusion Determination Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none

485

Electrode and method of interconnection sintering on an electrode of an electrochemical cell  

DOE Patents [OSTI]

An electrode structure is made by applying a base layer of doped LaCrO[sub 3] particles on a portion of an electrode and then coating the particles with a top layer composition such as CaO+Al[sub 2]O[sub 3], SrO+Al[sub 2]O[sub 3], or BaO+Al[sub 2]O[sub 3], and then heating the composition for a time effective to melt the composition and allow it to fill any open porosity in the base layer of doped LaCrO[sub 3] to form an interconnection, after which solid oxide electrolyte can be applied to the remaining portion of the electrode and the electrolyte can be covered with a cermet exterior electrode. 2 figures.

Ruka, R.J.; Kuo, L.J.H.

1994-01-11T23:59:59.000Z

486

BI-LAYER p-n JUNCTION INTERCONNECTIONS FOR COAL BASED SOLID OXIDE FUEL CELLS  

SciTech Connect (OSTI)

In this report, a new approach for lower operating temperature solid oxide fuel cells (SOFCs) interconnections (IC) consisting of a bi-layer structure is proposed and analyzed. The bi-layer structure consists of a p-type layer exposed to cathodic gas (air/oxygen) and an n-type layer exposed to anodic gas (fuel). It is theoretically shown that the interfacial oxygen partial pressure which is an important design variable, is dependent primarily on the oxygen partial pressure gradient across the IC, the low level oxygen conductivities of the two layers and is largely independent of their electronic conductivities and the total current density through the IC material. Experimental difficulties in fabricating bi-layer structures are presently being addressed.

Srikanth Gopalan

2005-01-29T23:59:59.000Z

487

Vibration control in plates by uniformly distributed PZT actuators interconnected via electric networks  

E-Print Network [OSTI]

In this paper a novel device aimed at controlling the mechanical vibrations of plates by means of a set of electrically-interconnected piezoelectric actuators is described. The actuators are embedded uniformly in the plate wherein they connect every node of an electric network to ground, thus playing the two-fold role of capacitive element in the electric network and of couple suppliers. A mathematical model is introduced to describe the propagation of electro-mechanical waves in the device; its validity is restricted to the case of wave-forms with wave-length greater than the dimension of the piezoelectric actuators used. A self-resonance criterion is established which assures the possibility of electro-mechanical energy exchange. Finally the problem of vibration control in simply supported and clamped plates is addressed; the optimal net-impedance is determined. The results indicate that the proposed device can improve the performances of piezoelectric actuation

Stefano Vidoli; Francesco dell'Isola

2010-07-09T23:59:59.000Z

488

DC electrodeposition of MnCo alloys on stainless steels for SOFC interconnect application  

SciTech Connect (OSTI)

High conductivity coatings that resist oxide scale growth and reduce chromium evaporation are needed to make stainless steel interconnect materials viable for long-term stable operation of solid oxide fuel cells (SOFC). Mn1.5Co1.5O4 spinel is one of the most promising coatings for interconnect application because of its high conductivity, good chromium retention capability, as well as good CTE match to ferritic stainless steels. MnCo electrodeposition followed by oxidization is potentially a low cost method for fabrication of (Mn,Co)3O4 spinel coatings. This work looks at the co-deposition of MnCo alloys for this application. As a guide to optimize the deposition process, characterizations of the cathodic reactions and reaction potentials are done using polarization curves. It was found that as cobalt concentration was varied that the alloy composition became richer in cobalt, indicating that the deposition is regular co-deposition process. It was also found that at 0.05M Co concentration in excess gluconate the MnCo alloys composition could be tuned by varying the current density. Coatings with MnCo around 1:1 could be obtained at a current density of 250 mA/cm2. However, the higher potential increased hydrogen production making the films more porous. Oxidation of the alloy coatings showed that much of the porosities could be eliminated during oxidation. It was found in a number of samples that fully dense coatings where obtained. The composition of the oxidized coating was found to become enriched in Mn, possibly due to the Mn fast diffusion from the substrate.

Wu, Junwei; Jiang, Yinglu; Johnson, Christopher; Liu, Xingbo

2008-03-01T23:59:59.000Z

489

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A. Ege Engin and Madhavan Swaminathan  

E-Print Network [OSTI]

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A occurs at discontinuities of the transmission line, wherever there is an interruption of the current that is connected to a transmission line. To reduce this discontinuity, current designs try to maintain a low

Swaminathan, Madhavan

490

Discrete Event Simulation of QoS of a SCADA System Interconnecting a Power Grid and a Telco Network  

E-Print Network [OSTI]

Discrete Event Simulation of QoS of a SCADA System Interconnecting a Power Grid and a Telco Network, Telco network and Power grid act as a whole heterogeneous network. While SCADA system and Telco network can be well represented by means of discrete event simulators. To represent a Power grid a continuous

Paris-Sud XI, Université de

491

On-Chip Copper-Based vs. Optical Interconnects: Delay Uncertainty, Latency, Power, and Bandwidth Density Comparative Predictions  

E-Print Network [OSTI]

On-Chip Copper-Based vs. Optical Interconnects: Delay Uncertainty, Latency, Power, and Bandwidth. Albonesi, Philippe M. Fauchet, and Eby G. Friedman Department of Electrical and Computer Engineering of Rochester, Rochester, New York, 14627 Department of Electrical and Computer Engineering,Cornell University

Friedman, Eby G.

492

Hierarchical interconnections in the nano-composite material Bone: Fibrillar Cross-Links resist fracture on several length scales  

E-Print Network [OSTI]

Hierarchical interconnections in the nano-composite material Bone: Fibrillar Cross-Links resist bone samples, possibly resisting the propagation of these cracks. Bone is one of the most important collagen and hydroxyapatite. Such materials are based on the crystal-polymer interactions on the molecular

Fygenson, Deborah Kuchnir

493

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area of An InterconnectedSystem  

E-Print Network [OSTI]

stations and then deliver that energy through the interconnected transmission and distribution systems are important factors for electricity enterprises to consider in their planning activities. One new important Abstract: Electric power systems of today are experiencing a difficulty of constrained transmission lines

Gross, George

494

624 IEEE JOURNAL ON SELECTED TOPICS IN QUANTUM ELECTRONICS, VOL. 9, NO. 2, MARCH/APRIL 2003 Optoelectronic Interconnection Technology  

E-Print Network [OSTI]

Optoelectronic Interconnection Technology in the HOLMS System Paul Lukowicz, Member, IEEE, Jürgen Jahns, Member. Süllau, J. F. Snowdon, M. Wirz, and G. Tröster Invited Paper Abstract--The High-Speed Optoelectronic and economical by developing optoelectronic packaging tech- nology compatible with standard electronic assembly

Jahns, Jürgen

495

Optoelectronic Interconnects XIII (OE112) Conference Chairs: Alexei L. Glebov, OptiGrate Corp. (USA); Ray T. Chen, The Univ.  

E-Print Network [OSTI]

Optoelectronic Interconnects XIII (OE112) Conference Chairs: Alexei L. Glebov, OptiGrate Corp. (USA); Ray T. Chen, The Univ. of Texas at Austin (USA) Program Committee: Bill Blubaugh, US Conec Ltd. (USA); Swapnajit Chakravarty, Omega Optics, Inc. (USA); John E. Cunningham, Oracle (USA); Allen M. Earman, Intersil

Jahns, Jürgen

496

Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) |  

Broader source: Energy.gov (indexed) [DOE]

Western Interstate Nuclear Compact State Nuclear Policy (Multiple Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Arizona Program Type Siting and Permitting Provider Western Interstate Energy Board Legislation authorizes states' entrance into the Western Interstate Nuclear Compact, which aims to undertake the cooperation of participating states in

497

Western Business Rountable: Coordination of Federal Authorizations for  

Broader source: Energy.gov (indexed) [DOE]

Western Business Rountable: Coordination of Federal Authorizations Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities The Western Business Roundtable ("Roundtable") respectfully submits the following comments relating to the U.S. Department of Energy's (DOE) request for public comments regarding implementation of its transmission siting obligations under Section 216(h) of the Federal Power Act. Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities More Documents & Publications Comments Received on Proposed Rulemaking for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal

498

Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2: November 5, 2: November 5, 2012 Western Europe Plug-in Car Sales, 2012 to someone by E-mail Share Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Facebook Tweet about Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Twitter Bookmark Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Google Bookmark Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Delicious Rank Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on Digg Find More places to share Vehicle Technologies Office: Fact #752: November 5, 2012 Western Europe Plug-in Car Sales, 2012 on AddThis.com...

499

Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Propane Vehicle Propane Vehicle Rebates - Western Propane Gas Association (WPGA) to someone by E-mail Share Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Facebook Tweet about Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Twitter Bookmark Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Google Bookmark Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Delicious Rank Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on Digg Find More places to share Alternative Fuels Data Center: Propane Vehicle Rebates - Western Propane Gas Association (WPGA) on AddThis.com...

500

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

B. Winter Net Internal Demand, Capacity Resources, and Capacity Margins B. Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Corporation Assessment Area, 2012 Actual, 2013-2017 Projected Net Internal Demand (Megawatts) -- Winter Eastern Interconnection ERCOT Western Interconnection All Interconnections Period FRCC NPCC Balance of Eastern Region MAPP MISO PJM SERC SPP TRE WECC Contiguous U.S. Actual 2012 / 2013 36,409 45,545 386,359 4,925 74,430 122,566 149,359 35,079 46,909 101,706 616,927 Projected 2013 / 2014 43,384 46,008 399,149 5,385 75,320 132,229 145,657 40,558 51,435 107,341 647,317 Projected 2014 / 2015 44,060 46,090 403,883 5,500 76,252 134,742 146,130 41,259 53,742 109,418 657,192 Projected 2015 / 2016 44,596 46,184 408,927 5,563 77,058 137,338 147,201 41,767 55,346 110,814 665,866