Powered by Deep Web Technologies
Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Advanced Interconnect Development  

SciTech Connect (OSTI)

The objectives of this project are to develop cost-effective, optimized materials for intermediate temperature SOFC interconnect and interconnect/electrode interface applications and identify and understand degradation processes in interconnects and at their interfaces with electrodes.

Yang, Z.G.; Maupin, G.; Simner, S.; Singh, P.; Stevenson, J.; Xia, G.

2005-01-27T23:59:59.000Z

2

Costs of Oil Dependence: A 2000 Update  

SciTech Connect (OSTI)

Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

Greene, D.L.

2000-05-17T23:59:59.000Z

3

Cost of Oil Dependence: A 2000 Update  

SciTech Connect (OSTI)

Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

Greene, D.L.; Tishchishyna, N.I.

2000-05-01T23:59:59.000Z

4

Process based cost modeling of emerging optoelectronic interconnects : implications for material platform choice  

E-Print Network [OSTI]

Continuously increasing demand for processing power, storage capacity, and I/O capacity in personal computing, data network, and display interface suggests that optical interconnects may soon supplant copper not only for ...

Liu, Shan, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

5

Cost-Effective Side-Coupling Polymer Fiber Optics for Optical Interconnections  

Science Journals Connector (OSTI)

Potentially low-cost optical side-couplers embedded along a polymer optical fiber are demonstrated using etched micromirrors. Both serial and parallel mirror fabrication possibilities...

Li, Yao; Wang, Ting; Fasanella, Kenneth

1998-01-01T23:59:59.000Z

6

Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)  

SciTech Connect (OSTI)

To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

Not Available

2014-04-01T23:59:59.000Z

7

Interconnection Panel  

Broader source: Energy.gov [DOE]

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the interconnection panel, including an overview of the generation interconnection process (GIP), and interconnection agreements and their terms.

8

Costs of Oil Dependence: A 2000 Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RNL RNL / TM -2000/ 152 Cos t s of O il D e pe nde nce : A 2000 Updat e David L. Greene Oak Ridge National Laboratory Nataliya I. Tishchishyna University of Tennessee May 2000 Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831 managed by UT-BATTELLE, LLC for the U. S. DEPARTMENT OF ENERGY under contract DE-AC05-00OR22725 iii TA BL E O F CO NTENTS LIST OF FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACKNOWLEDGMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii ABSTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. COST COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9

Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Panel Dan Tunnicliff, P.E. Manager, Government Segment, Southern California Edison Southern California Edison Application Processing Technical Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Overview of Generation Interconnection Process (GIP) * Transmission Level Interconnections - Governed by CAISO Tariff. * Generally for 220 kV and higher. * All applications must be submitted to the CAISO. * CAISO administers its tariff, which is approved by FERC. * Distribution Level Interconnections - Governed by SCE's WDAT. * Generally below 220 kV. * All applications must be submitted to SCE. * SCE administers its tariff, which is approved by FERC. 2 Southern California Edison Interconnection agreements are critically

10

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area of An InterconnectedSystem  

E-Print Network [OSTI]

stations and then deliver that energy through the interconnected transmission and distribution systems are important factors for electricity enterprises to consider in their planning activities. One new important Abstract: Electric power systems of today are experiencing a difficulty of constrained transmission lines

Gross, George

11

Sustainable systems for the storage and conversion of energy are dependent on interconnected  

E-Print Network [OSTI]

SEMTE abstract Sustainable systems for the storage and conversion of energy are dependent performance buildings, renewable energy conversion, and energy storage can be streamlined by identifying energy systems for harvesting low availability thermal energy and for providing integrated power, cooling

Reisslein, Martin

12

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Interconnect Issues in NE Serge Khalife, 15 th April 2010 Agenda  About National Grid and Service territories  Scope and definitions  Interconnection Process Overview  Time Frames and Fees  Governmental Entity Exceptions  Net Metering Limit  Technical Issues  Observations and recommendations  Questions and Answers Service Territories Map Scope and definitions  The Distributed Generation Group at National Grid process interconnection applications on the distribution system typically 10 MW and under with a few exceptions.  ISO-NE process larger interconnection applications on the transmission system. Their timelines and procedures vary from National Grid's Distributed Generation process.  Governmental Entity : The Commonwealth of Massachusetts, or any

13

Interconnection Resources  

Broader source: Energy.gov [DOE]

Interconnection is the technical procedures and legal requirements surrounding energy customers' ability to connect their small-scale renewable energy projects with the electricity grid. The...

14

Interconnection Standards  

Broader source: Energy.gov [DOE]

In July 2010, the Montana Public Service Commission (PSC) adopted interconnection rules, effective August 13, 2010. These rules apply to all electric utilities under the PSC's jurisdiction,...

15

Modeling Stakeholder/Value Dependency through Mean Failure Cost  

SciTech Connect (OSTI)

In an earlier series of works, Boehm et al. discuss the nature of information system dependability and highlight the variability of system dependability according to stakeholders. In a recent paper, the dependency patterns of this model are analyzed. In our recent works, we presented a stakeholder dependent quantitative security model, where we quantify security for a given stakeholder by the mean of the loss incurred by the stakeholder as a result of security threats. We show how this mean can be derived from the security threat configuration (represented as a vector of probabilities that reflect the likelihood of occurrence of the various security threats). We refer to our security metric as MFC, for Mean Failure Cost. In this paper, we analyze Boehm's model from the standpoint of the proposed metric, and show whether, to what extent, and how our metric addresses the issues raised by Boehm's Stakeholder/Value definition of system dependability.

Aissa, Anis Ben [University of Tunis, Belvedere, Tunisia] [University of Tunis, Belvedere, Tunisia; Abercrombie, Robert K [ORNL] [ORNL; Sheldon, Frederick T [ORNL] [ORNL; Mili, Ali [New Jersey Insitute of Technology] [New Jersey Insitute of Technology

2010-01-01T23:59:59.000Z

16

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Solar Wind Program Info State Iowa Program Type Interconnection Provider Iowa Utilities Board Different rules govern the interconnection of distributed generation facilities in Iowa, depending on whether or not the interconnection is with a utility whose rates are regulated by the Iowa Utilities Board (IUB). Rate regulated utilities include only the state's two investor-owned utilities -- MidAmerican Energy and Interstate Power and Light (IPL) -- and Linn

17

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decisions lay foundation for exception for utility contracts * Narrow exception GSA - Utility Interconnection Agreements * Application to Interconnection Agreements * Keys: Requirement for service Tariff or PSC action on contract

18

Hopper Interconnect  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interconnect Interconnect Interconnect jaguar xt4 Hopper's "Gemini" network is connected in a 3D torus. Description Hopper's compute nodes are connected via a custom high-bandwidth, low-latency network provided by Cray. The connectivity is in the form of a "mesh" in which each node is connected to other nearby nodes like strands in a fishing net, except that the mesh extends in three dimensions. Each network node handles not only data destined for itself, but also data to be relayed to other nodes. Nodes at the "edges" of the mesh network are connected to nodes at the other edge to form a 3-D torus. The custom chips that route communication over the network are known as "Gemini" and the entire network is often referred to as the "Cray Gemini

19

Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency  

Science Journals Connector (OSTI)

In many industrialized countries, manufacturing industries pay stratified electricity charges depending on the time of day ... may demand that industries pay real-time hourly electricity costs so as to use energy...

Joon-Yung Moon; Kitae Shin; Jinwoo Park

2013-09-01T23:59:59.000Z

20

Learn More About Interconnections  

Broader source: Energy.gov [DOE]

North America is comprised of two major and three minor alternating current (AC) power grids or interconnections. The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic...

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-01-01T23:59:59.000Z

22

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-10-01T23:59:59.000Z

23

Interconnection | Open Energy Information  

Open Energy Info (EERE)

Interconnection Interconnection Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some state’ standards apply only to investor-owned utilities, – not to municipal utilities and electric cooperatives. [1]

24

Measuring the Costs of U.S. Oil Dependence and the Benefits of...  

Office of Environmental Management (EM)

the Costs of U.S. Oil Dependence and the Benefits of Reducing It 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

25

Updating Technical Screens for PV Interconnection: Preprint  

SciTech Connect (OSTI)

Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlined as possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG. However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnection process. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

Coddington, M.; Ellis, A.; Lynn, K.; Razon, A.; Key, T.; Kroposki, B.; Mather, B.; Hill, R.; Nicole, K.; Smith, J.

2012-08-01T23:59:59.000Z

26

Western Interconnection Synchrophasor Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Synchrophasor measurements are a type of...

27

Interconnect Issues in NE  

Broader source: Energy.gov [DOE]

Presentation covers interconnect issues in the Northeast and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

28

Perforation patterned electrical interconnects  

DOE Patents [OSTI]

This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

Frey, Jonathan

2014-01-28T23:59:59.000Z

29

North American Electric Reliability Corporation Interconnections...  

Broader source: Energy.gov (indexed) [DOE]

Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern,...

30

Solar cell array interconnects  

DOE Patents [OSTI]

Electrical interconnects are disclosed for solar cells or other electronic components using a silver-silicone paste or a lead-tin (Pb-Sn) no-clean fluxless solder cream, whereby the high breakage of thin (<6 mil thick) solar cells using conventional solder interconnect is eliminated. The interconnects of this invention employs copper strips which are secured to the solar cells by a silver-silicone conductive paste which can be used at room temperature, or by a Pb-Sn solder cream which eliminates undesired residue on the active surfaces of the solar cells. Electrical testing using the interconnects of this invention has shown that no degradation of the interconnects developed under high current testing, while providing a very low contact resistance value. 4 figs.

Carey, P.G.; Thompson, J.B.; Colella, N.J.; Williams, K.A.

1995-11-14T23:59:59.000Z

31

H C26 Performance Analysis of Optica1 Interconnection Systems Inch-ing  

E-Print Network [OSTI]

Analysis of Optica1 Interconnection Systems Inch- ing T ransmitter T emperature Dependence .è ¯ ? , ? ? ì

Choi, Woo-Young

32

Viscosity Solutions of Systems of PDEs with Interconnected Obstacles and Switching Problem  

SciTech Connect (OSTI)

This paper deals with existence and uniqueness of a solution in viscosity sense, for a system of m variational partial differential inequalities with inter-connected obstacles. A particular case is the Hamilton-Jacobi-Bellmann system of the Markovian stochastic optimal m-states switching problem. The switching cost functions depend on (t,x). The main tool is the notion of systems of reflected backward stochastic differential equations with oblique reflection.

Hamadene, S., E-mail: hamadene@univ-lemans.fr; Morlais, M. A., E-mail: Marie_Amelie.Morlais@univ-lemans.fr [Universite du Maine, LMM (France)

2013-04-15T23:59:59.000Z

33

RidgenoseSolarInterconnectionProject  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cliffrose Solar Energy Interconnection Project DOEEA-1989 Western Area Power Administration (Western) is responding to a request from Longview Solar, LLC, to interconnect their...

34

Micro-fluidic interconnect  

SciTech Connect (OSTI)

An apparatus for simultaneously aligning and interconnecting microfluidic ports is presented. Such interconnections are required to utilize microfluidic devices fabricated in Micro-Electromechanical-Systems (MEMS) technologies, that have multiple fluidic access ports (e.g. 100 micron diameter) within a small footprint, (e.g. 3 mm.times.6 mm). Fanout of the small ports of a microfluidic device to a larger diameter (e.g. 500 microns) facilitates packaging and interconnection of the microfluidic device to printed wiring boards, electronics packages, fluidic manifolds etc.

Okandan, Murat (Albuquerque, NM); Galambos, Paul C. (Albuquerque, NM); Benavides, Gilbert L. (Los Ranchos, NM); Hetherington, Dale L. (Albuquerque, NM)

2006-02-28T23:59:59.000Z

35

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

36

Accelerating Communication in On-Chip Interconnection Networks  

E-Print Network [OSTI]

. In this dissertation, several schemes are proposed to accelerate communication in on-chip interconnection networks within area and cost budgets to overcome the problems. First, an early transition scheme for fully adaptive routing algorithms is proposed to improve...

Ahn, Minseon

2012-07-16T23:59:59.000Z

37

Interconnection Standards | Open Energy Information  

Open Energy Info (EERE)

Interconnection Standards Interconnection Standards Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some states’ standards apply only to investor-owned utilities – not to municipal utilities and electric cooperatives. [1]

38

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Solar Wind Program Info State Nevada Program Type Interconnection Provider Public Utilities Commission of Nevada In December 2003, the Nevada Public Utilities Commission (PUC) adopted interconnection standards for customers of NV Energy (formerly Nevada Power and Sierra Pacific Power) with on-site generation up to 20 megawatts (MW) in capacity. These standards are largely consistent with IEEE 1547 standards, California's interconnection rule (California Rule 21) and the model interconnection agreement developed by the National Association of

39

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Energy Sources Solar Wind Program Info State Maine Program Type Interconnection Provider Maine Public Utilities Commission The Maine Public Utility Commission (PUC) adopted interconnection procedures in January 2010. These rules apply to all transmission and distribution utilities operating in the state and apply to all distribution generation (not just renewables). Maine's interconnection procedures, based in part on the Interstate Renewable Energy Council Inc. 2006 Model Interconnection Procedures,* identify four different tiers with

40

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Indiana Program Type Interconnection Provider Indiana Utility Regulatory Commission In November 2005, the Indiana Utility Regulatory Commission (IURC) approved rules governing the interconnection of distributed generation (DG). Indiana's interconnection rules require the state's investor-owned utilities to provide three levels of interconnection to customer-generators.

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Phase 1 - Evaluation of a Functional Interconnect System for Solid Oxide Fuel Cells  

SciTech Connect (OSTI)

This project is focused on evaluating the suitability of materials and complex multi-materials systems for use as solid oxide fuel cell interconnects. ATI Allegheny Ludlum has generated promising results for interconnect materials which incorporate modified surfaces. Methods for producing these surfaces include cladding, which permits the use of novel materials, and modifications via unique thermomechanical processing, which allows for the modification of materials chemistry. The University of Pittsburgh is assisting in this effort by providing use of their in-place facilities for dual atmosphere testing and ASR measurements, along with substantial work to characterize post-exposure specimens. Carnegie Mellon is testing interconnects for chromia scale spallation resistance using macro-scale and nano-scale indentation tests. Chromia spallation can increase electrical resistance to unacceptable levels and interconnect systems must be developed that will not experience spallation within 40,000 hours at operating temperatures. Spallation is one of three interconnect failure mechanisms, the others being excessive growth of the chromia scale (increasing electrical resistance) and scale evaporation (which can poison the cathode). The goal of indentation fracture testing at Carnegie Mellon is to accelerate the evaluation of new interconnect systems (by inducing spalls at after short exposure times) and to use fracture mechanics to understand mechanisms leading to premature interconnect failure by spallation. Tests include bare alloys from ATI and coated systems from DOE Laboratories and industrial partners, using ATI alloy substrates. West Virginia University is working towards developing a cost-effective material for use as a contact material in the cathode chamber of the SOFC. Currently materials such as platinum are well suited for this purpose, but are cost-prohibitive. For the solid-oxide fuel cell to become a commercial reality it is imperative that lower cost components be developed. Based on the results obtained to date, it appears that sterling silver could be an inexpensive, dependable candidate for use as a contacting material in the cathode chamber of the solid-oxide fuel cell. Although data regarding pure silver samples show a lower rate of thickness reduction, the much lower cost of sterling silver makes it an attractive alternative for use in SOFC operation.

James M. Rakowski

2006-09-30T23:59:59.000Z

42

interconnect | OpenEI  

Open Energy Info (EERE)

interconnect interconnect Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago) Keywords buildings carbon dioxide emissions carbon footprinting CO2 commercial buildings electricity emission factors ERCOT hourly emission factors interconnect nitrogen oxides NOx

43

Central American electrical interconnection  

SciTech Connect (OSTI)

A technical cooperation grant of $2.25 million, designed to strengthen the capacity of Central American countries to operate their regional interconnected electrical system, was announced by the Inter-American Development Bank (IDB). The grant, extended from the banks Fund for Special Operations, will help improve the capacity of the regions electric power companies to achieve economical, safe operation of the interconnected electric power systems. The funds will also be used to finance regional studies of the accords, procedures, regulations, and supervisory mechanisms for the system, as well as program development and data bases.

Not Available

1988-12-01T23:59:59.000Z

44

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Michigan Program Type Interconnection Provider Michigan Public Service Commission The Michigan Public Service Commission (PSC) first adopted interconnection standards for distributed generation (DG) in September 2003. The original standards provided for 5 levels of interconnection with cutoffs at 30 kilowatts (kW), 150 kW, 750 kW, and 2 megawatts (MW), but left many details

45

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Oregon Program Type Interconnection Provider Oregon Public Utility Commission Oregon has three separate interconnection standards: one for net-metered systems, one for small generator facilities (non-net metered systems) and one for large generator facilities (non-net metered systems). Oregon has also established separate net metering requirements and interconnection standards for the state's primary investor-owned utilities (PGE and

46

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State District of Columbia Program Type Interconnection Provider Washington Utilities and Transportation Commission In September 2007, the Washington Utilities and Transportation Commission (UTC) adopted interconnection standards for distributed generation (DG) systems up to 20 megawatts (MW) in capacity. The revised standards provide for two separate levels of interconnection based on system capacity. The

47

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Kentucky Program Type Interconnection Provider Kentucky Public Service Commission In April 2008, Kentucky enacted legislation which required the Kentucky Public Service Commission (PSC) to develop interconnection and net metering guidelines for all retail electric suppliers operating in Kentucky (excluding TVA utilities). The Kentucky PSC adopted those guidelines on January 8, 2009 (Order 2008-00169). The PSC's rules set forth a two-tiered approach to simplify the interconnection process:

48

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Wind Program Info State Maryland Program Type Interconnection Provider Maryland Public Service Commission In April 2007, Maryland enacted legislation ([http://mgaleg.maryland.gov/2007RS/chapters_noln/Ch_119_sb0595E.pdf S.B. 595]) requiring the Maryland Public Service Commission (PSC) to form a small generator interconnection working group to develop interconnection standards and procedures that are "consistent with nationally adopted

49

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New York Program Type Interconnection Provider New York State Department of Public Service New York first adopted uniform interconnection standards in 1999 (see history below). The Standard Interconnection Requirements (SIR) have subsequently been amended several times since, most recently with the adoption of far reaching revisions in February 2009. Several more minor

50

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Connecticut Program Type Interconnection Provider Public Utilities Regulatory Authority In December 2007, the Connecticut Department of Public Utility Control (DPUC) now called the Public Utilities Regulatory Authority (PURA) approved new interconnection guidelines for distributed energy systems up to 20 megawatts (MW) in capacity. Connecticut's interconnection guidelines apply to the state's two investor-owned utilities -- Connecticut Light and Power

51

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Energy Sources Solar Wind Program Info State Delaware Program Type Interconnection Provider Delaware Public Service Commission '''''Note: Delaware law ([http://delcode.delaware.gov/title26/c010/index.shtml#1014 26 Del. C. § 1014]) requires the Delaware Public Service Commission (PSC), Delaware Electric Cooperative (DEC), and municipal utilities to develop interconnection rules using as a guide the Interstate Renewable Energy Council's (IREC) model interconnection rules and the U.S. Department of

52

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Arizona Program Type Interconnection Provider Arizona Corporation Commission '''''Note: In June 2007, the Arizona Corporation Commission (ACC) initiated a rulemaking process to establish statewide interconnection standards for distributed generation (DG). This proceeding is still in progress. Until the new official rules go into effect, the commission has recommended that the utilities use the [http://images.edocket.azcc.gov/docketpdf/0000074361.pdf Interconnection

53

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Hawaii Program Type Interconnection Provider Hawaii Public Utilities Commission Hawaii has established simplified interconnection rules for small renewables and separate rules for all other distributed generation (DG). For inverter-based systems up to 10 kilowatts (kW) in capacity (and inverter-based DG under 250 kW on islands other than Kauai), there is a simple application process for interconnection. Systems must use inverters

54

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Pennsylvania Program Type Interconnection Provider Pennsylvania Public Utility Commission The Pennsylvania Public Utilities Commission was required to adopt interconnection standards and net-metering rules by the Alternative Energy Portfolio Standards Act of 2004.The PUC subsequently adopted interconnection standards for net-metered distributed generation (DG)

55

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State South Dakota Program Type Interconnection Provider S.D. Public Utilities Commission South Dakota's interconnection standards for distributed generation, adopted by the state Public Utilities Commission (PUC) in May 2009, apply to customers of investor-owned utilities.* The rules provide for four levels of interconnection for systems up to 10 megawatts (MW) in capacity:

56

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State North Carolina Program Type Interconnection Provider North Carolina Utilities Commission The North Carolina Utilities Commission (NCUC) adopted comprehensive interconnection standards for distributed generation in June 2008. The NCUC standards, which are similar to the Federal Energy Regulatory Commission's (FERC) interconnection standards for small generators,

57

VLSI interconnect Avinoam Kolodny  

E-Print Network [OSTI]

1000 10000 100000 Length [um] Power Local total Global total TOTAL globallocal Power Distribution by Wirelength · Total Dynamic Power · Global clock ­ not included · Local signals nets = 66% · Global signals global signals Total dynamic power (Gate, Diffusion and Interconnect) local clock global signals global

Kolodny, Avinoam

58

Reversible concentric ring microfluidic interconnects  

E-Print Network [OSTI]

A reversible, Chip-to-Chip microfluidic interconnect was designed for use in high temperature, high pressure applications such as chemical microreactor systems. The interconnect uses two sets of concentric, interlocking ...

Thompson, Mary Kathryn, 1980-

2004-01-01T23:59:59.000Z

59

North American Electric Reliability Corporation Interconnections...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

60

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State New Jersey Program Type Interconnection Provider New Jersey Board of Public Utilities New Jersey's interconnection standards apply statewide to all electric distribution utilities, but not to the small number of municipal utilities and electric cooperatives in the state. The rules, first adopted in 2001, have been revised several times since their inception, most recently in May 2012. The current standards include the following basic provisions:

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Nonprofit Residential Schools Utility Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Colorado Program Type Interconnection Provider Colorado Public Utilities Commission In December 2005, the Colorado Public Utilities Commission (PUC) adopted standards for net metering and interconnection, as required by Amendment 37, a renewable-energy ballot initiative approved by Colorado voters in November 2004. The PUC standards generally apply to utilities with 40,000 or more customers and all cooperative utilities.*

62

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Home Weatherization Wind Program Info State Florida Program Type Interconnection Provider Florida Public Service Commission In March 2008, the Florida Public Service Commission (PSC) adopted interconnection rules for renewable-energy systems up to two megawatts (MW) in capacity. The PSC rules apply only to the state's investor-owned utilities; the rules do not apply to electric cooperatives or municipal

63

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Program Info State Vermont Program Type Interconnection Provider Vermont Public Service Board Vermont has adopted separate interconnection standards for net-metered energy systems that are 150 kW or less, and for all other distributed-generation (DG) systems. '''Interconnection Standards for Net-Metered Systems 150 kW or less''' Vermont requires electric utilities to offer net metering to all customers with photovoltaic (PV) systems, wind-energy systems, fuel cells or

64

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Wisconsin Program Type Interconnection Provider Public Service Commission of Wisconsin In February 2004, the Wisconsin Public Service Commission adopted interconnection standards for distributed generation (DG) systems up to 15 megawatts (MW) in capacity. All investor-owned utilities (IOUs) and municipal utilities are required to abide by the standard provisions.

65

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State South Carolina Program Type Interconnection Provider Public Service Commission of South Carolina The South Carolina Public Service Commission (PSC) adopted simplified interconnection guidelines for small distributed generation (DG) in December 2006. These guidelines address renewable-energy systems and other forms of DG up to 20 kilowatts (kW) in capacity for residential systems,

66

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Texas Program Type Interconnection Provider Public Utility Commission of Texas The Texas Public Utility Regulatory Act (PURA) of 1999 included a provision that "a customer is entitled to have access to on-site distributed generation". As a result, the Public Utility Commission of Texas (PUCT) adopted interconnection standards in 1999. The rules apply to electrical generating facilities (consisting of one or more on-site distributed-generation units) located at a customer's point of delivery,

67

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Minnesota Program Type Interconnection Provider Minnesota Public Utilities Commission Minnesota's net-metering law, enacted in 1983, applies to all investor-owned utilities, municipal utilities and rural electric cooperatives. Qualifying facilities of less than 1,000 kilowatts (kW) are eligible for net metering. However, uniform interconnection regulations were not implemented when net metering was established.

68

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Industrial Residential Savings Category Bioenergy Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State Nebraska Program Type Interconnection Provider Nebraska Energy Office Nebraska enacted legislation in May 2009 [http://nebraskalegislature.gov/FloorDocs/101/PDF/Final/LB436.pdf (LB 436)], establishing general rules for interconnecting and net metering systems that generate electricity. Nebraska's policy applies to systems that use solar, wind, methane, biomass, hydropower or geothermal resources to produce electricity and have a rated capacity of 25 kilowatts (kW) or less. To be eligible, a facility must meet all applicable safety, performance,

69

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Solar Wind Program Info State Virginia Program Type Interconnection Provider Virginia State Corporation Commission Virginia has two interconnection standards: one for net-metered systems and one for systems that are not net-metered. '''Interconnection for Net-Metered Systems''' Customer-generators that net meter must comply with the interconnection rules within the regulations governing net metering (20 VAC 5-315-40). These rules apply to residential customers generating up to 10 kW* and commercial systems of up to 500 kW (or greater if the utility's net

70

Fact #632: July 19, 2010 The Costs of Oil Dependence | Department...  

Energy Savers [EERE]

the problem of oil dependence and the economic problems that arise from it. According to Oak Ridge National Laboratory (ORNL) researchers Greene and Hopson, oil dependence is a...

71

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State New Hampshire Program Type Interconnection Provider New Hampshire Public Utilities Commission New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity using solar, wind, geothermal, hydro, tidal, wave, biomass, landfill gas, bio-oil or

72

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State Missouri Program Type Interconnection Provider Missouri Department of Natural Resources Missouri enacted legislation (S.B. 54) in June 2007 requiring all of the state's electric utilities -- including municipal utilities and electric cooperatives -- to offer net metering to customers with systems up to 100 kilowatts (kW) in capacity that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells

73

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New Mexico Program Type Interconnection Provider New Mexico Public Regulation Commission Interconnection in New Mexico is governed by New Mexico Public Regulation Commission (PRC) Rule 568 and Rule 569. These rules, adopted in July 2008, revised and clarified the state's existing rules. Rule 569 applies to all qualifying facilities (QFs) under PURPA, which generally includes all renewable-energy systems and combined-heat-and-power (CHP) systems up to 80

74

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Ohio Program Type Interconnection Provider Ohio Public Utilities Commission '''''Note: In July 2012, the Public Utilities Commission of Ohio (PUCO) opened a docket ([http://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=12-2051&x=0&y=0 Case 12-0251-EL-ORD]) to review the net metering and interconnection rules for investor-owned utilities. Details will be posted as more information is available.'''''

75

interconnect region | OpenEI  

Open Energy Info (EERE)

interconnect region interconnect region Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

76

Repairable chip bonding/interconnect process  

DOE Patents [OSTI]

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

1997-01-01T23:59:59.000Z

77

ORNL/TM-2005/45 COSTS OF U.S. OIL DEPENDENCE: 2005 UPDATE  

E-Print Network [OSTI]

..........................................................................................29 5.2 CASE 1A: OIL PRICE ELASTICITY OF GDP VARIES WITH OIL COST SHARE .......................................................................................................36 5.3 CASE 1B: OIL PRICE ELASTICITY OF GDP CONSTANT OVER TIME ......37 5.4 CASE 2: STOCHASTIC ....................................................................................40 5.6 THE IMPACT OF CONTINUED HIGH OIL PRICES IN 2005..........................42 6. CONCLUSIONS

78

PowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks  

E-Print Network [OSTI]

. Cooling costs can be pro- hibitive (consider the high power budgets of industry-standard six- foot serverPowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks Li Shang Li,peh,jha}@ee.princeton.edu Niraj K. Jha ABSTRACT Power consumption is a critical issue in interconnection network design, driven

Shang, Li

79

Low-power approaches for parallel, free-space photonic interconnects  

SciTech Connect (OSTI)

Future advances in the application of photonic interconnects will involve the insertion of parallel-channel links into Multi-Chip Modules (MCMS) and board-level parallel connections. Such applications will drive photonic link components into more compact forms that consume far less power than traditional telecommunication data links. These will make use of new device-level technologies such as vertical cavity surface-emitting lasers and special low-power parallel photoreceiver circuits. Depending on the application, these device technologies will often be monolithically integrated to reduce the amount of board or module real estate required by the photonics. Highly parallel MCM and board-level applications will also require simplified drive circuitry, lower cost, and higher reliability than has been demonstrated in photonic and optoelectronic technologies. An example is found in two-dimensional point-to-point array interconnects for MCM stacking. These interconnects are based on high-efficiency Vertical Cavity Surface Emitting Lasers (VCSELs), Heterojunction Bipolar Transistor (HBT) photoreceivers, integrated micro-optics, and MCM-compatible packaging techniques. Individual channels have been demonstrated at 100 Mb/s, operating with a direct 3.3V CMOS electronic interface while using 45 mW of electrical power. These results demonstrate how optoelectronic device technologies can be optimized for low-power parallel link applications.

Carson, R.F.; Lovejoy, M.L.; Lear, K.L.; WSarren, M.E.; Seigal, P.K.; Craft, D.C.; Kilcoyne, S.P.; Patrizi, G.A.; Blum, O.

1995-12-31T23:59:59.000Z

80

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alternative Fuel Vehicles Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Utah Program Type Interconnection Provider Utah Public Service Commission Utah requires the state's only investor-owned utility, Rocky Mountain Power (RMP), and most electric cooperatives* to offer net metering to customers who generate electricity using solar energy, wind energy, hydropower, hydrogen, biomass, landfill gas, geothermal energy, waste gas or waste heat capture and recovery. The bill that established net metering also established some basic rules for interconnection. In April 2010, the Utah Public Service Commission (PSC) adopted final rules for interconnection. The rules described below took effect April 30, 2010.

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Interconnection Agreements for Onsite Generation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Agreements Interconnection Agreements for Onsite Generation Office of Real Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception

82

Optically Interconnected MulticomputersUsing  

E-Print Network [OSTI]

Optically Interconnected MulticomputersUsing Inverted-GraphTopologies Tosuccessfullyexploitthebenefitsofopticaltechnologyinatightlycoupledmulticomputer, the architecturaldesignmust reflectboth the advantages and limitationsof optics. This article systems. Although optics have con- tributed dramatically to long-distance communi- cation and more

Krchnavek, Robert R.

83

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State California Program Type Interconnection Provider California Public Utilities Commission '''''Note: The California Public Utilities Commission (CPUC) approved a [http://docs.cpuc.ca.gov/EFILE/MOTION/162852.PDF proposed settlement] in September 2012, enacting the first fundamental redesign of Rule 21 since 2000. The complete revised Rule 21 Tariff, as described at a high level below, can be found beginning on page 136 of CPUC Decision 12-09-018. The individual tariffs adopted by the utilities can be found on the CPUC web

84

CAD implications of new interconnect technologies  

Science Journals Connector (OSTI)

This paper looks at the CAD implications of possible new interconnect technologies. We consider three technologies in particular: three dimensional ICs, carbon nanotubes as a replacement for metal interconnects, and optical interconnections for longer ... Keywords: 3D interconnect, On-chip optical, nanotubes

Louis K. Scheffer

2007-06-01T23:59:59.000Z

85

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

86

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Broader source: Energy.gov (indexed) [DOE]

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

87

Manufacturing Analysis of SOFC Interconnect Coating Processes - NexTech Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manufacturing Analysis of SOFC Manufacturing Analysis of SOFC Interconnect Coating Processes- NexTech Materials Background The adoption of high-temperature metal alloys as alternatives to traditional ceramic interconnect materials provides a cost effective path for the production of solid oxide fuel cells (SOFCs). Low-cost and effective protective coatings must be developed for the metallic system and stack components for SOFCs to be economical. Since current

88

Learn More About Interconnections | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Learn More About Learn More About Interconnections Learn More About Interconnections Learn More About Interconnections EASTERN INTERCONNECTION North America is comprised of two major and three minor alternating current (AC) power grids or "interconnections." The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic coast (excluding Québec), South to Florida and West to the foot of the Rockies (excluding most of Texas). All of the electric utilities in the Eastern Interconnection are electrically tied together during normal system conditions and operate at a synchronized frequency operating at an average of 60Hz. Click here for more information. DOE is in the process of issuing awards to two entities in the Eastern Interconnection: one to the Eastern Interconnection Planning

89

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State West Virginia Program Type Interconnection Provider West Virginia Public Service Commission In 2006, West Virginia stakeholders came together to consider net metering, interconnection as required by the Federal Energy Policy Act (2005) and agreed upon a "Statement of Consensus Among Parties," which was presented to and accepted by the West Virginia Public Service Commission (PSC) in December 2006. The consensus agreement did include interconnection guidelines for the state, however, the PSC did not initiate a formal rule-making or incorporate the guidelines into agency rules. Rather, the

90

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

General Public/Consumer General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Arkansas Program Type Interconnection Provider Arkansas Public Service Commission In April 2001, Arkansas enacted legislation directing the Arkansas Public Service Commission (PSC) to establish net-metering rules for certain renewable-energy systems. The Arkansas Public Service Commission (PSC) adopted net-metering rules in July 2002 (Order No. 02-046-R). Section 3 applies to the interconnection of net-metered facilities to existing electric power systems.* Systems that generate electricity using solar, wind, hydro, geothermal and biomass resources are eligible to interconnect

91

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bioenergy Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Kansas Program Type Interconnection Provider Kansas Corporation Commission Kansas adopted the Net Metering and Easy Connection Act in May 2009 (see K.S.A. 66-1263 through 66-1271), establishing interconnection guidelines and net metering for customer-owned generators. Net metering and the accompanying interconnection guidelines apply to systems that generate electricity using solar, wind, methane, biomass or hydro resources, and to fuel cells using hydrogen produced by an eligible renewable technology, with a rated capacity of 25 kilowatts (kW) or less for residential customers, 200 kW or less for non-residential customers and 1.5 megawatts

92

GSA-Utility Interconnection Agreements  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception - B-197583, January 19, 1981 GSA - Utility Interconnection Agreements

93

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Louisiana Program Type Interconnection Provider Louisiana Public Service Commission '''''Note: Ongoing proceedings related to net metering can be found in [http://lpscstar.louisiana.gov/star/portal/lpsc/page/Dockets/portal.aspx Docket R-31417.]''''' The Louisiana Public Service Commission (PSC) adopted rules for net metering and interconnection in November 2005. Louisiana's rules, based on those in place in Arkansas, require publicly-owned utilities and rural electric cooperatives to offer net metering to customers with systems that generate electricity using solar, wind, hydropower, geothermal or biomass

94

Interconnection Guidelines (Rhode Island) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Rhode Island Program Type Interconnection Provider Rhode Island Public Utilities Commission Rhode Island enacted legislation (HB 6222) in June 2011 to standardize the application process for the interconnection of customer-sited renewable-energy systems to the state's distribution grid. Rhode Island's interconnection policy is not nearly as comprehensive as

95

National Offshore Wind Energy Grid Interconnection Study  

SciTech Connect (OSTI)

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States. A total of 54GW of offshore wind was assumed to be the target for the analyses conducted. A variety of issues are considered including: the anticipated staging of offshore wind; the offshore wind resource availability; offshore wind energy power production profiles; offshore wind variability; present and potential technologies for collection and delivery of offshore wind energy to the onshore grid; potential impacts to existing utility systems most likely to receive large amounts of offshore wind; and regulatory influences on offshore wind development. The technologies considered the reliability of various high-voltage ac (HVAC) and high-voltage dc (HVDC) technology options and configurations. The utility system impacts of GW-scale integration of offshore wind are considered from an operational steady-state perspective and from a regional and national production cost perspective.

Daniel, John P. [ABB Inc; Liu, Shu [ABB Inc; Ibanez, Eduardo [National Renewable Energy Laboratory; Pennock, Ken [AWS Truepower; Reed, Greg [University of Pittsburgh; Hanes, Spencer [Duke Energy

2014-07-30T23:59:59.000Z

96

High-temperature quenching of electrical resistance in graphene interconnects  

E-Print Network [OSTI]

into the chip interconnect design the materials with low electrical resistance and high thermal con- ductivity dependence of the resistance were explained by the thermal generation of the electron-hole pairs and carrier, increased total thermal boundary resistance of the chip layers, incorporation of the alternative dielectric

97

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

98

New Report Characterizes Existing Offshore Wind Grid Interconnection...  

Office of Environmental Management (EM)

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities September 3,...

99

PJM Interconnection (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Interconnection PJM (originally Pennsylvania, Jersey, Maryland) Interconnection is a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. The PJM region has an area of 214,000 square miles, a population of about 60 million and a peak demand of 163,848 megawatts

100

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Wind Program Info State Georgia Program Type Interconnection Provider Georgia Public Service Commission The Georgia Cogeneration and Distributed Generation Act of 2001 allows residential electricity customers with photovoltaic (PV) systems, wind-energy systems or fuel cells up to 10 kilowatts (kW) in capacity, and commercial facilities up to 100 kW, to connect to the grid. The aggregate capacity of distributed generation systems is limited to 0.2% of a utility's system peak demand from the previous year. Interconnected customers must comply with all relevant national standards,

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Monolithically interconnected GaAs solar cells: A new interconnection technology for high voltage solar cell output  

SciTech Connect (OSTI)

Photovoltaic linear concentrator arrays can benefit from high performance solar cell technologies being developed at AstroPower. Specifically, these are the integration of thin GaAs solar cell and epitaxial lateral overgrowth technologies with the application of monolithically interconnected solar cell (MISC) techniques. This MISC array has several advantages which make it ideal for space concentrator systems. These are high system voltage, reliable low cost monolithically formed interconnections, design flexibility, costs that are independent of array voltage, and low power loss from shorts, opens, and impact damage. This concentrator solar cell will incorporate the benefits of light trapping by growing the device active layers over a low-cost, simple, PECVD deposited silicon/silicon dioxide Bragg reflector. The high voltage-low current output results in minimal 12R losses while properly designing the device allows for minimal shading and resistance losses. It is possible to obtain open circuit voltages as high as 67 volts/cm of solar cell length with existing technology. The projected power density for the high performance device is 5 kW/m for an AMO efficiency of 26% at 1 5X. Concentrator solar cell arrays are necessary to meet the power requirements of specific mission platforms and can supply high voltage power for electric propulsion systems. It is anticipated that the high efficiency, GaAs monolithically interconnected linear concentrator solar cell array will enjoy widespread application for space based solar power needs. Additional applications include remote man-portable or ultra-light unmanned air vehicle (UAV) power supplies where high power per area, high radiation hardness and a high bus voltage or low bus current are important. The monolithic approach has a number of inherent advantages, including reduced cost per interconnect and increased reliability of array connections. There is also a high potential for a large number of consumer products.

Dinetta, L.C.; Hannon, M.H.

1995-10-01T23:59:59.000Z

102

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

System C. Dyadic Green's Functions 1. TM and TE Decomposition 2. Transmission-Line Green's Functions . NUiVIERICAL PROCEDURES . A. Basis functions and testing procedure . 1. Interconnect of Microstrip Lines 2. Slot-Coupled Microstrip Dipole . 3... data of return loss on the 20 GHz slot-coupled rect- angular patch antenna. . FIG URE Pa. ge 28 Typical transmission line section containing a 1A current source. . . 68 CHAPTER I INTRODUCTION Many studies on slot-coupled microstrip antennas have...

Luong, Giam-Minh

2012-06-07T23:59:59.000Z

103

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

104

Metallic Interconnects for Solid Oxide Fuel Cell: Performance of Reactive Element Oxide Coating During 10, 20 and 30Months Exposure  

Science Journals Connector (OSTI)

One of challenges in improving the performance and cost-effectiveness of SOFCs (Solid Oxide Fuel Cells) is the development of suitable interconnect materials. Chromia-forming alloys and especially ferritic sta...

S. Fontana; S. Chevalier; G. Caboche

2012-12-01T23:59:59.000Z

105

Puerto Rico - Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Autoridad de Energía Electrica de Puerto Rico In 2007, the Autoridad de Energía Electrica de Puerto Rico (PREPA*) adopted interconnection standards based on the standard contained in the federal Energy Policy Act of 2005. PREPA promulgated interconnection rules in August 2008 that apply to all distributed generation (DG) projects that

106

Distributed PV Interconnection Screening Procedures and Online...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools" 30 mins. Q&Adiscussion Upcoming Meeting: September 24, 2014 Highlights of SunShot Projects: Interconnection as Part of a Strategic Resource Planning Process Alison...

107

Recent Development of SOFC Metallic Interconnect  

SciTech Connect (OSTI)

Interest in solid oxide fuel cells (SOFC) stems from their higher eciencies and lower levels of emitted pollu- tants, compared to traditional power production methods. Interconnects are a critical part in SOFC stacks, which connect cells in series electrically, and also separate air or oxygen at the cathode side from fuel at the anode side. Therefore, the requirements of interconnects are the most demanding, i:e:, to maintain high elec- trical conductivity, good stability in both reducing and oxidizing atmospheres, and close coecient of thermal expansion (CTE) match and good compatibility with other SOFC ceramic components. The paper reviewed the interconnect materials, and coatings for metallic interconnect materials.

Wu JW, Liu XB

2010-04-01T23:59:59.000Z

108

Updating Interconnection Screens for PV System Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Abraham Ellis, Roger Hill Sandia National Laboratories Tom Key, Kristen Nicole, Jeff Smith Electric Power Research Institute Updating Interconnection Screens for PV System...

109

Generation Interconnection and Deliverability Allocation Procedures...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Generation Interconnection and Deliverability Allocation ProceduresLegal Abstract Generation...

110

Interconnection of on-site photovoltaic generation to the electric utility. [Conference paper  

SciTech Connect (OSTI)

Electrical interconnection with the local electric utility of small, privately owned, on-site photovoltaic generating systems will be necessary. Legal guidelines exist through PURPA, administered by FERC, to establish interconnection, but economic viability will be the deciding factor in constructing photovoltaic generating systems. Although nationally recognized technical standards do not yet exist for interconnecting photovoltaic generation with an electric utility, most utilities have considered the need for developing cogeneration standards, and a few have developed such standards independently. Additional costs incurred by utilities in providing service interconnections to customers with cogeneration will be passed along to those customers, either as a direct assessment or as part of the applicable rate schedule. An economic-analysis methodology has been developed to allow comparing various possible photovoltaic-generating-system configurations under different utility rate structures and varying economic climates on a consistent basis.

Eichler, C.H.; Kilar, L.A.; Stiller, P.H.

1980-01-01T23:59:59.000Z

111

Durability of Metallic Interconnects and Protective Coatings  

SciTech Connect (OSTI)

To build up a useful voltage, a number of solid oxide fuel cells (SOFCs) are electrically connected into series in a stack via interconnects, which are placed between adjacent cells. In addition to functioning as a bi-polar electrical connector, the interconnect also acts as a separator plate that separates the fuel at the anode side of one cell from the air at the cathode side on an adjacent cell. During SOFC operation at the high temperatures, the interconnects are thus simultaneously exposed to the oxidizing air at one side and a reducing fuel that can be either hydrogen or hydrocarbon at the other. Besides, they are in contact with adjacent components, such as electrodes or electrical contacts, seals, etc. With steady reduction in SOFC operating temperatures into the low or intermediate range 600-850oC, oxidation resistant alloys are often used to construct interconnects. However, the metallic interconnects may degrade via interactions at their interfaces with surrounding environments or adjacent components, potentially affecting the stability and performance of interconnects and the SOFC stacks. Thus protection layers are applied to metallic interconnects that also intend to mitigate or prevent chromium migration into cells and the cell poisoning. This chapter provides a comprehensive review of materials for metallic interconnects, their degradation and coating protection.

Yang, Zhenguo; Stevenson, Jeffry W.

2009-12-15T23:59:59.000Z

112

FPGA Interconnect Delay Fault Testing Erik Chmelar  

E-Print Network [OSTI]

A satisfactory FPGA testing method meets several crite- ria. First, the routing resources must be explicitlyFPGA Interconnect Delay Fault Testing Erik Chmelar Center for Reliable Computing Stanford is a scalable manufactur- ing test method for all SRAM-based FPGAs, able to detect multiple interconnect delay

Stanford University

113

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

114

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

115

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave...  

Broader source: Energy.gov (indexed) [DOE]

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona SUMMARY DOE's...

116

Renewable Generation and Interconnection to the Electrical Grid...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Renewable Generation and Interconnection to the Electrical Grid in Southern California Renewable Generation and Interconnection to the Electrical Grid in Southern California...

117

Power Consumption and Scalability of Optically Switched Interconnects  

Science Journals Connector (OSTI)

We analyzed three realizations of optically switched interconnects regarding power consumption and scalability. The optically switched interconnects provide higher power efficiency...

Fehratovic, Naida; Aleksic, Slavisa

118

New_Contractor_Information_for_Interconnection_Security_Agreement...  

Broader source: Energy.gov (indexed) [DOE]

NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforIntercon...

119

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt...  

Energy Savers [EERE]

Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska SUMMARY DOE's Western Area...

120

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona SUMMARY DOE's...

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Fault (In)Dependent Cost Estimates and Conflict-Directed Backtracking to Guide Sequential Circuit Test Generation  

Science Journals Connector (OSTI)

The search for tests for sequential circuits (STPG) by deterministic test pattern generation is a process of alternately performing mandatory assignments and heuristic decisions on signal lines. We have observed problems in the decision-making process ... Keywords: ATPG, sequential circuit TPG, cost estimates, back-jumping, conflict-directed backtrack, three-state (tri-state) circuit TPG

Mario Konijnenburg; Hans Van der Linden; Ad van de Goor

1999-11-01T23:59:59.000Z

122

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

A, A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

123

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or  

E-Print Network [OSTI]

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or system Electricity and Gas: A system used to distribute electricity and gas around the world/certain area, by compromising to minimise costs and generate the most electricity and gas as possible, which maximises profits

Wright, Francis

124

Optically Interconnected Data Center Architecture for Bandwidth Intensive Energy Efficient Networking  

E-Print Network [OSTI]

Optically Interconnected Data Center Architecture for Bandwidth Intensive Energy Efficient) 854 2900, e-mail: howard@ee.columbia.edu ABSTRACT The relentless rise of data-intensive cloud will either be prohibitively costly, overly complex, or result in unsustainable energy requirements. Network

Bergman, Keren

125

PJM Interconnection, LLC | Open Energy Information  

Open Energy Info (EERE)

PA References: SGIC1 This article is a stub. You can help OpenEI by expanding it. PJM Interconnection, LLC Smart Grid Project was awarded 13,698,091 Recovery Act Funding...

126

Carbon nanotube synthesis for integrated circuit interconnects  

E-Print Network [OSTI]

Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

Nessim, Gilbert Daniel

2009-01-01T23:59:59.000Z

127

Interconnecting PV on New York City's Secondary Network Distribution System  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to ???¢????????networks???¢??????? in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1???¢????????PV Deployment Analysis for New York City???¢????????we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2???¢????????A Briefing for Policy Makers on Connecting PV to a Network Grid???¢????????presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3???¢????????Technical Review of Concerns and Solutions to PV Interconnection in New Y

K. Anderson; M. Coddington; K. Burman; S. Hayter; B. Kroposki; and A. Watson

2009-11-30T23:59:59.000Z

128

NREL Variability Analysis for the Western Interconnect (Presentation)  

SciTech Connect (OSTI)

This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

129

Accelerating Fatigue Testing for Cu Ribbon Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation describes fatigue experiments and discusses dynamic mechanical loading for Cu ribbon interconnects.

Bosco, N.; Silverman, T.; Wohlgemuth , J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shioda, T.; Zenkoh, H.; Miyashita, M.; Tadanori, T.; Suzuki, S.

2013-05-01T23:59:59.000Z

130

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

131

Committed regional electrical interconnection projects in the Middle East  

SciTech Connect (OSTI)

Due to the well-known advantages of electrical interconnections and their consequent benefits, Jordan considers the interconnection of its electrical network with the neighboring electrical networks as one of its main corporate strategies. At present the electrical interconnection project of the networks of Egypt, Iraq, Jordan, Syria, and Turkey is progressing. To achieve this interconnection project, two feasibility studies were conducted: interconnection of the Egyptian and Jordanian electrical power systems; interconnection of the electrical networks of Egypt, Iraq, Jordan, Syria, and Turkey (EIJST interconnection). This presentation reviews these studies and their results.

Azzam, M.; Al-Said, A.

1994-12-01T23:59:59.000Z

132

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

133

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Cooperation Among States in the Western Interconnection on Electric Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

134

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

135

The Development of Interconnection Standards in Six States In 2007-2008  

SciTech Connect (OSTI)

This paper discusses the process of developing standards for the interconnection of photovoltaic systems and other generators under ten megawatts to the electric grid. State utility commission rulemakings in 2007-2008 in Florida, New Mexico, North Carolina, Maryland, Illinois and Utah provide the basis for analysis of what is and should be considered in the development of standards, and how the process can be improved. State interconnection standards vary substantially, and many utilities have discretion to establish additional or different requirements, creating literally hundreds of sets of rules. This lack of uniformity imposes a significant cost on project developers and installers to track and comply with applicable rules. As well, burdensome provisions and uncertain costs and timelines present formidable barriers to entry, which advocates have limited resources to challenge. For a better process, the author proposes: establishing federal standards as a baseline, involving solar advocates, and developing a utility cost-recovery mechanism.

Keyes, Jason B.

2008-04-01T23:59:59.000Z

136

Regulation and investment under uncertainty: An application to power grid interconnection  

E-Print Network [OSTI]

An Application to Power Grid Interconnection. Jean-Danielto the Ontario power grid. This interconnection will allowfor our application to a power grid interconnection. Second,

Saphores, Jean-Daniel M; Gravel, E; Bernard, J T

2004-01-01T23:59:59.000Z

137

Novel Composite Materials for SOFC Cathode-Interconnect Contact  

SciTech Connect (OSTI)

This report summarized the research efforts and major conclusions of our University Coal Research Project, which focused on developing a new class of electrically-conductive, Cr-blocking, damage-tolerant Ag-perovksite composite materials for the cathode-interconnect contact of intermediate-temperature solid oxide fuel cell (SOFC) stacks. The Ag evaporation rate increased linearly with air flow rate initially and became constant for the air flow rate {ge} {approx} 1.0 cm {center_dot} s{sup -1}. An activation energy of 280 KJ.mol{sup -1} was obtained for Ag evaporation in both air and Ar+5%H{sub 2}+3%H{sub 2}O. The exposure environment had no measurable influence on the Ag evaporation rate as well as its dependence on the gas flow rate, while different surface morphological features were developed after thermal exposure in the oxidizing and reducing environments. Pure Ag is too volatile at the SOFC operating temperature and its evaporation rate needs to be reduced to facilitate its application as the cathode-interconnect contact. Based on extensive evaporation testing, it was found that none of the alloying additions reduced the evaporation rate of Ag over the long-term exposure, except the noble metals Au, Pt, and Pd; however, these noble elements are too expensive to justify their practical use in contact materials. Furthermore, the addition of La{sub 0.8}Sr{sub 0.2}MnO{sub 3} (LSM) into Ag to form a composite material also did not significantly modify the Ag evaporation rate. The Ag-perovskite composites with the perovskite being either (La{sub 0.6}Sr{sub 0.4})(Co{sub 0.8}Fe{sub 0.2})O{sub 3} (LSCF) or LSM were systematically evaluated as the contact material between the ferritic interconnect alloy Crofer 22 APU and the LSM cathode. The area specific resistances (ASRs) of the test specimens were shown to be highly dependent on the volume percentage and the type of the perovskite present in the composite contact material as well as the amount of thermal cycling that the specimens were subjected to during testing. The Ag-LSCF composite contact materials proved more effective in trapping Cr within the contact material and preventing Cr migration into the cathode than the Ag-LSM composites. Ag-perovskite composite contact materials are promising candidates for use in intermediate-temperature SOFC stacks with ferritic stainless steel interconnects due to their ability to maintain acceptably low ASRs while reducing Cr migration into the cathode material.

J. H. Zhu

2009-07-31T23:59:59.000Z

138

Effect of Via Separationand Low-k Dielectric Materials on the Thermal Characteristics of Cu Interconnects  

E-Print Network [OSTI]

Effect of Via Separationand Low-k Dielectric Materials on the Thermal Characteristics of Cu in low-k based interconnect structures by providing lower thermal resistance paths. In this paper that the temperature is highly dependent on the via separation. A 3-D electro-thermal simulation methodology using

139

Original Paper Fully interconnected, linear control  

E-Print Network [OSTI]

Original Paper Fully interconnected, linear control for limit cycle walking Joseph H Solomon1 and simple control methodologies for these models (Collins & Ruina, 2005; Hobbelen & Wisse, 2008a, 2008b. Corresponding author: Joseph H. Solomon, Northwestern University, Department of Mechanical Engineering, 2145

Hartmann, Mitra J. Z.

140

Electric network interconnection of Mashreq Arab Countries  

SciTech Connect (OSTI)

Power system interconnection is a well established practice for a variety of technical and economical reasons. Several interconnected networks exist worldwide for a number of factors. Some of these networks cross international boundaries. This presentation discusses the future developments of the power systems of Mashreq Arab Countries (MAC). MAC consists of Bahrain, Egypt, Iraq, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, United Arab Emirates (UAE), and Yemen. Mac power systems are operated by government or semigovernment bodies. Many of these countries have national or regional electric grids but are generally isolated from each other. With the exception of Saudi Arabia power systems, which employ 60 Hz, all other MAC utilities use 50 Hz frequency. Each country is served by one utility, except Saudi Arabia, which is served by four major utilities and some smaller utilities serving remote towns and small load centers. The major utilities are the Saudi Consolidated electric Company in the Eastern Province (SCECO East), SCECO Center, SCECO West, and SCECO South. These are the ones considered in this study. The energy resources in MAC are varied. Countries such as Egypt, Iraq, and Syria have significant hydro resources.The gulf countries and Iraq have abundant fossil fuel, The variation in energy resources as well as the characteristics of the electric load make it essential to look into interconnections beyond the national boundaries. Most of the existing or planned interconnections involve few power systems. A study involving 12 countries and over 20 utilities with different characteristics represents a very large scale undertaking.

El-Amin, I.M.; Al-Shehri, A.M.; Opoku, G.; Al-Baiyat, S.A.; Zedan, F.M.

1994-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Broader source: Energy.gov (indexed) [DOE]

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

142

seca-core-tech-sofc-interconnect | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Developmental SOFC Interconnect Alloys PDF-1.2MB - M.P. Brady, B.A. Pint, T.R. Armstrong Products Bulk Alloy Breakout Team PDF-92KB Interconnect-Electrode Interface...

143

Fast high-order variation-aware IC interconnect analysis  

E-Print Network [OSTI]

Interconnects constitute a dominant source of circuit delay for modern chip designs. The variations of critical dimensions in modern VLSI technologies lead to variability in interconnect performance that must be fully accounted for in timing...

Ye, Xiaoji

2009-05-15T23:59:59.000Z

144

National Offshore Wind Energy Grid Interconnection Study (NOWEGIS)  

Broader source: Energy.gov [DOE]

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States.

145

High temperature solid electrolyte fuel cell configurations and interconnections  

DOE Patents [OSTI]

High temperature fuel cell configurations and interconnections are made including annular cells having a solid electrolyte sandwiched between thin film electrodes. The cells are electrically interconnected along an elongated axial outer surface.

Isenberg, Arnold O. (Forest Hills, PA)

1984-01-01T23:59:59.000Z

146

Solar Energy to Benefit from New FERC Interconnection Procedures...  

Energy Savers [EERE]

Solar Energy to Benefit from New FERC Interconnection Procedures Solar Energy to Benefit from New FERC Interconnection Procedures October 30, 2014 - 5:15pm Addthis As a major win...

147

Voltage Collapse SimulationVoltage Collapse Simulation (Eastern Interconnection(Eastern Interconnection  

E-Print Network [OSTI]

of 2003 that is available on the PSERC web site, http://pserc.org. 2 #12;Symbols in the Simulation Window · Buses: heavy dark lines where the generators, loads and transmission lines interconnect · Transmission

148

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Aggregator Programs. Demand Response Measurement andIncorporating Demand Response into Western Interconnection13 Demand Response Dispatch

Satchwell, Andrew

2014-01-01T23:59:59.000Z

149

Electrically long vertical interconnects for microwave circuits and antennas  

E-Print Network [OSTI]

. . . . . 2 . . . . 3 . . . . 4 . 4 . 4 . 5 . . . . 5 . . . . 6 . . . . 7 A. Transmission Line Interconnects. . B. Electromagnetically Coupled lnterconnects . . . . . C. Conclusions . . . . . . 8 . . . 10 III FIDELITY SIMULATION 12 A. B. C. D... interconnects satisfying specifications set by Raytheon Systems Co. This research was sponsored by Raytheon Systems Co. RF/Microwave Division. A vertical interconnect couples transmission lines, antennas, and components between vertically spaced layers...

Coutant, Matthew Richard

2012-06-07T23:59:59.000Z

150

Highly Insulating Windows - Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost Cost The following is an estimate of the cost effective incremental cost of highly-insulating windows (U-factor=0.20 Btu/hr-ft2-F) compared to regular ENERGY STAR windows (U-factor 0.35 Btu/hr-ft2-F). Energy savings from lower U-factors were simulated with RESFEN over an assumed useful window life of 25 years. To determine the maximum incremental cost at which highly-insulating windows would still be cost-effective, we used a formula used by many utility companies to calculate the cost of saved energy from energy efficiency programs, based on the programs' cost and savings. We turned this formula around so that the cost of saved energy equals the present energy prices in the studied locations, whereas the program cost (the incremental cost of the windows) is the dependent variable. By entering 5%

151

Interconnection Standards for Small Generators | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards for Small Generators Interconnection Standards for Small Generators Interconnection Standards for Small Generators < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) adopted "small generator" interconnection standards for distributed energy resources up to 20 megawatts (MW) in capacity in May 2005.* The FERC's standards apply only to facilities subject to the jurisdiction of the commission; these facilities

152

Eastern Interconnection Planning Collaborative News Release  

Broader source: Energy.gov (indexed) [DOE]

1 1 NEWS RELEASE FOR IMMEDIATE RELEASE May 23, 2011 Contact: David Whiteley d.a.whiteley@att.net 314-753-6200 Eastern Interconnection Grid Planning Authorities to Study Set of Stakeholder-Identified Electric System Futures The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a major step forward with the stakeholder-defined specifications for the resource futures to be considered in the macroeconomic analysis in Phase I of the Project. The stakeholders are to be congratulated for their hard work in achieving a

153

Frequency Instability Problems in North American Interconnections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Frequency Instability Problems in Frequency Instability Problems in North American Interconnections May 1, 2011 DOE/NETL-2011/1473 Frequency Instability Problems in North American Interconnections Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

154

Interconnection of bundled solid oxide fuel cells  

DOE Patents [OSTI]

A system and method for electrically interconnecting a plurality of fuel cells to provide dense packing of the fuel cells. Each one of the plurality of fuel cells has a plurality of discrete electrical connection points along an outer surface. Electrical connections are made directly between the discrete electrical connection points of adjacent fuel cells so that the fuel cells can be packed more densely. Fuel cells have at least one outer electrode and at least one discrete interconnection to an inner electrode, wherein the outer electrode is one of a cathode and and anode and wherein the inner electrode is the other of the cathode and the anode. In tubular solid oxide fuel cells the discrete electrical connection points are spaced along the length of the fuel cell.

Brown, Michael; Bessette, II, Norman F; Litka, Anthony F; Schmidt, Douglas S

2014-01-14T23:59:59.000Z

155

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

156

Definition: Interconnection Reliability Operating Limit Tv | Open Energy  

Open Energy Info (EERE)

Limit Tv Limit Tv Jump to: navigation, search Dictionary.png Interconnection Reliability Operating Limit Tv The maximum time that an Interconnection Reliability Operating Limit can be violated before the risk to the interconnection or other Reliability Coordinator Area(s) becomes greater than acceptable. Each Interconnection Reliability Operating Limit's Tv shall be less than or equal to 30 minutes.[1] Related Terms Interconnection Reliability Operating Limitinterconnection, interconnection References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interconnection_Reliability_Operating_Limit_Tv&oldid=493031

157

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie

158

Performance testing of small interconnected wind systems  

SciTech Connect (OSTI)

There is a need for performance information on small windmills intended for interconnected operation with utility distribution service. The owner or prospective buyer needs the data to estimate economic viability and service reliability, while the utility needs it to determine interconnection arrangements, maintain quality of power delivered by its line, and to answer customer inquiries. No existing testing program provides all the information needed, although the Rocky Flats test site comes close. To fill this need for Michigan, Consumers Power Company and the Michigan Electric Cooperative Association helped support a two-year program at Michigan State University involving extensive performance testing of an Enertech 1500 and a 4-kW Dakota with a Gemini inverter. The performance study suggested measurements necessary to characterize SWECS for interconnected operation. They include SWECS energy output to a-c line, miles of wind passing the rotor, var-hour metering for average var consumption, and recording watt, current, and voltmeters to assess SWECS output variability. Added instruments for waveform measurement (to assess power quality) are also needed. Typical data taken at the MSU test site are used to illustrate the techniques and preliminary data from a current project is given. Finally, conclusions about SWECS performance are listed.

Park, G.L.; Krauss, O.; Miller, J.

1984-05-01T23:59:59.000Z

159

Selection and Evaluation of Heat-Resistant Alloys for Planar SOFC Interconnect Applications  

SciTech Connect (OSTI)

Over the past several years, the steady reduction in SOFC operating temperatures to the intermediate range of 700~850oC [1] has made it feasible for lanthanum chromite to be supplanted by metals or alloys as the interconnect materials. Compared to doped lanthanum chromite, metals or alloys offer significantly lower raw material and fabrication costs. However, to be a durable and reliable, a metal or alloy has to satisfy several functional requirements specific to the interconnect under SOFC operating conditions. Specifically, the interconnect metal or alloy should possess the following properties: (i) Good surface stability (resistance to oxidation, hot corrosion, and carburization) in both cathodic (air) and anodic (fuel) atmospheres; (ii) Thermal expansion matching to the ceramic PEN (positive cathode-electrolyte-negative anode) and seal materials (as least for a rigid seal design); (iii) High electrical conductivity through both the bulk material and in-situ formed oxide scales; (iv) Bulk and interfacial thermal mechanical reliability and durability at the operating temperature; (v) Compatibility with other materials in contact with interconnects such as seals and electrical contact materials.

Yang, Z Gary; Weil, K. Scott; Paxton, Dean M.; Stevenson, Jeffry W.

2002-11-21T23:59:59.000Z

160

Updating Interconnection Screens for PV System Integration  

SciTech Connect (OSTI)

This white paper evaluates the origins and usefulness of the capacity penetration screen, offer short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen. Short-term and longer-term alternatives approaches are offered as examples; however, specific modifications to screening procedures should be discussed with stakeholders and must ultimately be adopted by state and federal regulatory bodies.

Coddington, M.; Mather, B.; Kroposki, B.; Lynn, K.; Razon, A.; Ellis, A.; Hill, R.; Key, T.; Nicole, K.; Smith, J.

2012-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Dissecting the Cost of the Smart Grid | Open Energy Information  

Open Energy Info (EERE)

Dissecting the Cost of the Smart Grid Dissecting the Cost of the Smart Grid Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Dissecting the Cost of the Smart Grid Focus Area: Crosscutting Topics: System & Application Design Website: www.greentechmedia.com/articles/read/dissecting-the-cost-of-the-smart- Equivalent URI: cleanenergysolutions.org/content/dissecting-cost-smart-grid Language: English Policies: Regulations Regulations: "Resource Integration Planning,Cost Recovery/Allocation,Net Metering & Interconnection" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

162

Topic B Awardee: Eastern Interconnection States' Planning Council |  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection States' Eastern Interconnection States' Planning Council Topic B Awardee: Eastern Interconnection States' Planning Council The Eastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the American Recovery and Reinvestment Act (ARRA). The goal is to create an unprecedented collaborative among the states in the Eastern Interconnection. Comprised of public utility commissions, Governors' offices, energy offices, and other key government representatives, this collaboration will foster and produce consistent and coordinated direction to the regional and interconnection-level analyses and planning. Significant state input and direction increases the probability that the outputs will be useful to the

163

Recovery Act Interconnection Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

164

Flip chip electrical interconnection by selective electroplating and bonding  

E-Print Network [OSTI]

on a glass substrate made of 500/2000 A° of Cr/Au with 3150 lm in length and 10 lm in width. Two silicon. The interconnection chip has 102 Cr/Au interconnection lines with 3150 lm in length and 10 lm in width. The bonding pads on the ends of the interconnection lines are 40 lm by 40 lm. A 0.8 lm thick layer of aluminum

Lin, Liwei

165

Application Of Ti-Based Self-Formation Barrier Layers To Cu Dual-Damascene Interconnects  

SciTech Connect (OSTI)

Cu interconnects have been used extensively in ULSI devices. However, large resistance-capacitance delay and poor device reliability have been critical issues as the device feature size has reduced to nanometer scale. In order to achieve low resistance and high reliability of Cu interconnects, we have applied a thin Ti-based self-formed barrier (SFB) using Cu(Ti) alloy seed to 45nm-node dual damascene interconnects and evaluated its performance. The line resistance and via resistance decreased significantly, compared with those of conventional Ta/TaN barriers. The stress migration performance was also drastically improved using the SFB process. A performance of time dependent dielectric breakdown revealed superior endurance. These results suggest that the Ti-based SFB process is one of the most promising candidates for advanced Cu interconnects. TEM and X-ray photoelectron spectroscopy observations for characterization of the Ti-based SFB structure were also performed. The Ti-based SFB consisted of mainly amorphous Ti oxides. Amorphous or crystalline Ti compounds such as TiC, TiN, and TiSi formed beneath Cu alloy films, and the formation varied with dielectric.

Ito, Kazuhiro; Kohama, Kazuyuki [Department of Materials Science and Engineering, Kyoto University, Kyoto 606-8501 (Japan); Ohmori, Kazuyuki; Mori, Kenichi; Maekawa, Kazuyoshi; Asai, Koyu [Process Technology Div., Renesas Electronics Corporation, Hitachinaka, Ibaraki 312-8504 (Japan); Murakami, Masanori [The Ritsumeikan Trust, Nakagyo-ku, Kyoto 604-8520 (Japan)

2010-11-24T23:59:59.000Z

166

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

167

Community Wind Handbook/Research Interconnecting behind Your...  

Open Energy Info (EERE)

your local utility. Most utilities and other electricity providers require you to enter into a formal agreement with them before you are allowed to interconnect your wind...

168

Response from PJM Interconnection LLC and Pepco to Department...  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM...

169

Pepco and PJM Interconnection Comments on District of Columbia...  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM...

170

CHP: Connecting the Gap between Markets and Utility Interconnection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Markets and Utility Interconnection and Tariff Practices, 2006 The adoption of combined heat and power (CHP) systems by American industries has made substantial strides in the...

171

Physics of Failure of Electrical Interconnects | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies Program Annual Merit Review and Peer Evaluation ape036devoto2011p.pdf More Documents & Publications Physics of Failure of Electrical Interconnects Reliability...

172

Proposed rule for Interconnection for Wind Energy and Other Alternativ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REGULATORY COMMISSION 18 CFR Part 35 (Docket No. RM05-4-000) Interconnection for Wind Energy and Other Alternative Technologies (January 24, 2005) AGENCY: Federal Energy...

173

RAPID/Geothermal/Transmission Siting & Interconnection/Montana...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionMontana) Jump to: navigation, search RAPID Regulatory and Permitting...

174

RAPID/Geothermal/Transmission Siting & Interconnection/Hawaii...  

Open Energy Info (EERE)

Utilities Commission to interconnect a proposed renewable energy project to the existing grid. Transmission Siting Threshold: No threshold provided Public Utility Definition for...

175

RAPID/Geothermal/Transmission Siting & Interconnection/Utah ...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionUtah) Jump to: navigation, search RAPID Regulatory and Permitting...

176

RAPID/Geothermal/Transmission Siting & Interconnection/Oregon...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionOregon) Jump to: navigation, search RAPID Regulatory and Permitting...

177

U.S. Army Fort Carson Interconnection Agreement  

Broader source: Energy.gov [DOE]

Document describes a sample interconnection agreement for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA).

178

Modelling of interconnects including coaxial cables and multiconductor lines.  

E-Print Network [OSTI]

??In recent years, electromagnetic compatibility (EMC) problems associated with high frequency and high speed interconnects are becoming of increasing concern. Coaxial cables are a popular (more)

Teo, Yu Xian

2013-01-01T23:59:59.000Z

179

The Design and Tests in a Three Interconnected Fluidized Bed  

Science Journals Connector (OSTI)

Hydrogen production based on chemical looping combustion can obtain clean hydrogen with near zero emission of carbon dioxide. This technique can be auto-thermal, making it very promising for hydrogen production. In this paper, the interconnected fluidized ... Keywords: chemical looping combustion, hydrogen production Interconnected fluidized beds

Junjiao Zhang; Jingzhou Jiang; Qiang Lu; Changqing Dong; Teng Zhang; Xinglei Liu; Zhiyong Liang; Yongping Yang

2010-12-01T23:59:59.000Z

180

A Scalable Interconnection Network Architecture for Petaflops Computing  

Science Journals Connector (OSTI)

Extrapolating technology advances in the near future, a computer architecture capable of petaflops performance will likely be based on a collection of processing nodes interconnected by a high-performance network. One possible organization would consist ... Keywords: computer architecture, interconnection networks, performance analysis, petaflops computing

Constantine Katsinis; Bahram Nabet

2004-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Trinity Public Utilities District Direct Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

LEAD FEDERAL AGENCY: U.S. Department of Energy LEAD FEDERAL AGENCY: U.S. Department of Energy COOPERATING AGENCIES: U.S. Forest Service, U.S. Bureau of Land Management, U.S. Bureau of Reclamation TITLE: Final Environmental Impact Statement for the Trinity Public Utilities District Direct Interconnection Project, DOE/EIS-0389 LOCATION: Trinity County, California CONTACT: For additional information on this For general information on the final environmental impact U.S. Department of Energy National statement, contact: Environmental Policy Act process, write or call: Mr. Mark J. Wieringa Ms. Carol M. Borgstrom, Director Western Area Power Administration Office of NEPA Policy and Compliance P.O. Box 281213 Health, Safety and Security (GC-20) Lakewood, CO 80228 U.S. Department of Energy

182

10 Year Transmission Plan for the Western Electricity Interconnection  

Broader source: Energy.gov (indexed) [DOE]

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

183

Pepco and PJM Interconnection Comments on District of Columbia Public  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the Department of Energy on February 17, 2006. Potomac Electric Power Company and PJM Interconnection, L.L.C. jointly submit these comments and answer to the requests for rehearing submitted by the City of Alexandria, Virginia and the Director of the Virginia Department of Environmental Quality in the captioned proceeding . Pepco and PJM Interconnection Comments on District of Columbia Public

184

Low Carbon Jobs in an Interconnected World | Open Energy Information  

Open Energy Info (EERE)

Jobs in an Interconnected World Jobs in an Interconnected World Jump to: navigation, search Name Low Carbon Jobs in an Interconnected World Agency/Company /Organization Global Climate Network Partner Institute for Public Policy Research Sector Energy Focus Area Energy Efficiency, Renewable Energy Topics Co-benefits assessment, Background analysis Website http://www.ippr.org.uk/publica Country Australia, Brazil, China, Germany, India, Nigeria, South Africa, United Kingdom, United States Australia and New Zealand, South America, Eastern Asia, Western Europe, Southern Asia, Western Africa, Southern Africa, Northern Europe, Northern America References Low Carbon Jobs in an Interconnected World[1] Low Carbon Jobs in an Interconnected World Author: Global Climate Network Price: Free Publication Date: 30 March 2010

185

A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth to Enable Latency Reduction  

E-Print Network [OSTI]

D R A FT 1 A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth optoelectronic interconnection network router capable of supplying and efficiently utilizing higher bandwidth routing, interconnection network, latency hiding/reduction techniques, optoelectronic router. 1

Pinkston, Timothy M.

186

Cost Containment  

Science Journals Connector (OSTI)

Cost containment in health care involves awide ... , the growth rate of expenditure or certain costs of health care services. These measures include ... patient education, etc. The reasons for increased cost ...

2008-01-01T23:59:59.000Z

187

Oxidation Resistant, Cr Retaining, Electrically Conductive Coatings on Metallic Alloys for SOFC Interconnects  

SciTech Connect (OSTI)

This report describes significant results from an on-going, collaborative effort to enable the use of inexpensive metallic alloys as interconnects in planar solid oxide fuel cells (SOFCs) through the use of advanced coating technologies. Arcomac Surface Engineering, LLC, under the leadership of Dr. Vladimir Gorokhovsky, is investigating filtered-arc and filtered-arc plasma-assisted hybrid coating deposition technologies to promote oxidation resistance, eliminate Cr volatility, and stabilize the electrical conductivity of both standard and specialty steel alloys of interest for SOFC metallic interconnect (IC) applications. Arcomac has successfully developed technologies and processes to deposit coatings with excellent adhesion, which have demonstrated a substantial increase in high temperature oxidation resistance, stabilization of low Area Specific Resistance values and significantly decrease Cr volatility. An extensive matrix of deposition processes, coating compositions and architectures was evaluated. Technical performance of coated and uncoated sample coupons during exposures to SOFC interconnect-relevant conditions is discussed, and promising future directions are considered. Cost analyses have been prepared based on assessment of plasma processing parameters, which demonstrate the feasibility of the proposed surface engineering process for SOFC metallic IC applications.

Vladimir Gorokhovsky

2008-03-31T23:59:59.000Z

188

Effect of interconnect creep on long-term performance of SOFC of one cell stacks  

SciTech Connect (OSTI)

Creep deformation becomes relevant for a material when the operating temperature is near or exceeds half of its melting temperature (in degrees of Kelvin). The operating temperatures for most of the solid oxide fuel cells (SOFC) under development in the SECA program are around 1073oK. High temperature ferritic alloys are potential candidates as interconnect (IC) materials and spacers due to their low cost and CTE compatibility with other SOFC components. Since the melting temperature of most stainless steel is around 1800oK, possible creep deformation of IC under the typical cell operating temperature should not be neglected. In this paper, the effects of interconnect creep behavior on stack geometry change and stress redistribution of different cell components are predicted and summarized. The goal of the study is to investigate the performance of the fuel cell stack by obtaining the fuel and air channel geometry changes due to creep of the ferritic stainless steel interconnect, therefore indicating possible SOFC performance change under long term operations. IC creep models were incorporated into SOFC-MP and Mentat FC, and finite element analyses were performed to quantify the deformed configuration of the SOFC stack under the long term steady state operating temperature. It is found that creep behavior of the ferritic stainless steel IC contributes to narrowing of both the fuel and the air flow channels. In addition, stress re-distribution of the cell components suggests the need for a compliant sealing material that also relaxes at operating temperature.

Liu, Wenning N.; Sun, Xin; Khaleel, Mohammad A.

2008-02-01T23:59:59.000Z

189

Viscosity solutions of systems of PDEs with interconnected obstacles and Multi modes switching problems  

E-Print Network [OSTI]

This paper deals with existence and uniqueness, in viscosity sense, of a solution for a system of m variational partial differential inequalities with inter-connected obstacles. A particular case of this system is the deterministic version of the Verification Theorem of the Markovian optimal m-states switching problem. The switching cost functions are arbitrary. This problem is connected with the valuation of a power plant in the energy market. The main tool is the notion of systems of reflected BSDEs with oblique reflection.

Hamadne, Said

2011-01-01T23:59:59.000Z

190

E-Print Network 3.0 - attach interconnection technology Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Barbara; NONE Collection: Biology and Medicine ; Engineering 7 Call for Papers Optoelectronic Interconnects XII (OE113) Summary: interconnect technologies ultra-short reach...

191

Corrosion and Protection of Metallic Interconnects in Solid Oxide Fuel Cells  

SciTech Connect (OSTI)

Energy security and increased concern over environmental protection have spurred a dramatic world-wide growth in research and development of fuel cells, which electrochemically convert incoming fuel into electricity with no or low pollution. Fuel cell technology has become increasingly attractive to a number of sectors, including utility, automotive, and defense industries. Among the various types of fuel cells, solid oxide fuel cells (SOFCs) operate at high temperature (typically 650-1,000 C) and have advantages in terms of high conversion efficiency and the flexibility of using hydrocarbon fuels, in addition to hydrogen. The high temperature operation, however, can lead to increased mass transport and interactions between the surrounding environment and components that are required to be stable during a lifetime of thousands of hours and up to hundreds of thermal cycles. For stacks with relatively low operating temperatures (<800 C), the interconnects that are used to electrically connect a number of cells in series are typically made from cost-effective metals or alloys. The metallic interconnects must demonstrate excellent stability in a very challenging environment during SOFC operation, as they are simultaneously exposed to both an oxidizing (air) environment on the cathode side and a reducing environment (hydrogen or a reformed hydrocarbon fuel) on the anode side. Other challenges include the fact that water vapor is likely to be present in both of these environments, and the fuel is likely to contain impurities, such as sulfides. Since the fuel is usually a reformed hydrocarbon fuel, such as natural gas, coal gas, biogas, gasoline, etc., the interconnect is exposed to a wet carbonaceous environment at the anode side. Finally, the interconnect must be stable towards any adjacent components, such as electrodes, seals and electrical contact materials, with which it is in physical contact.

Yang, Z Gary; Stevenson, Jeffry W.; Singh, Prabhakar

2007-12-09T23:59:59.000Z

192

Webinar: Understanding the Interconnection and Transmission Service Queues  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Understanding the Interconnection and Transmission Service Webinar: Understanding the Interconnection and Transmission Service Queues Webinar: Understanding the Interconnection and Transmission Service Queues March 5, 2012 - 6:10pm Addthis This webinar will take place March 28, 2012, from 11 a.m.-12:30 p.m. MDT. Hosted by the U.S. Department of Energy's (DOE's) Office of Indian Energy Policy and Programs, DOE's Tribal Energy Program, the Environmental Protection Agency (EPA), and the Western Area Power Administration, this Web seminar will answer the following questions: What is the large generator interconnection procedure? How is transmission service requested? What does this mean for Tribes interested in gaining access to the transmission system? This is the fifth in a series of webinars that will run through September 2012.

193

Utility Wind Integration Group Distributed Wind/Solar Interconnection  

Broader source: Energy.gov (indexed) [DOE]

Utility Wind Integration Group Distributed Wind/Solar Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop May 21, 2013 8:00AM MDT to May 22, 2013 5:00PM MDT Golden, Colorado This two-day workshop will answer your questions about interconnecting wind and solar plants and other distributed generation applications to electric distribution systems while providing insight on integrating large-scale renewable generation into the transmission system. Held at the National Renewable Energy Laboratory's (NREL) state-of-the-art Energy Systems Integration Facility (ESIF) on the first day and at the Western Area Power Administration's Electric Power Training Center (EPTC) on the second day, the workshop will provide an overview of wind and solar interconnection

194

USLCI Interconnect Region Electricity datasets, 2008 | OpenEI  

Open Energy Info (EERE)

76 76 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278976 Varnish cache server USLCI Interconnect Region Electricity datasets, 2008 Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included.Datasets include generation and transmission of electricity for each of the interconnect regions. It is representative of the year 2008 mix of fuels used for utility generations for each of the interconnect regions and is based on the EIA electricity reports for all power plants in the US. Detailed information on the methodology is included in the module report and detailed spreadsheet.

195

PARS II New Contractor Information for Interconnection Security Agreement  

Broader source: Energy.gov (indexed) [DOE]

New Contractor Information for Interconnection Security Agreement New Contractor Information for Interconnection Security Agreement V1.0 (November 18, 2010) The Department of Energy (DOE) Headquarters Program Cyber Security Plan (PCSP), dated February 2008, requires the Project Assessment and Reporting System (PARS) II System Owner and the contractor sign an Interconnection Security Agreement (ISA). The requirement for an Interconnection Security Agreement can be found on page 182 of the PCSP. The ISA template is available for review on the PARS II portal (http://management.energy.gov/online_resources/pars2.htm) under Contractor Documents. Before the contractor begins sending data to PARS II, DOE will send the ISA to the contractor for review and signature. In order to prepare the ISA for review and signature, the PARS II Support Team needs

196

Interconnecting PV on NYC's Secondary Network Distribution System  

Broader source: Energy.gov [DOE]

To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report.

197

Photovoltaic Systems Interconnected onto Secondary Network Distribution Systems Success Stories  

Broader source: Energy.gov [DOE]

This report examines six case studies of photovoltaic (PV) systems integrated into secondary network systems. The six PV systems were chosen for evaluation because they are interconnected to secondary network systems located in four major Solar America Cities.

198

An optical data receiver for integrated photonic interconnects  

E-Print Network [OSTI]

The throughput bounds of traditional interconnect networks in microprocessors are being pushed to their limits. In past single-core processors, the number of long global wires constituted only a small fraction of the total. ...

Georgas, Michael S. (Michael Stephen)

2009-01-01T23:59:59.000Z

199

Evaluation of phase change materials for reconfigurable interconnects  

E-Print Network [OSTI]

The possible use of programmable integrated circuit interconnect vias using an indirectly heated phase change material is evaluated. Process development and materials investigations are examined. Devices capable of multiple ...

Khoo, Chee Ying

2010-01-01T23:59:59.000Z

200

Microsoft Word - CX-Hardeson_Interconnection_23Sept2013.doc  

Broader source: Energy.gov (indexed) [DOE]

request. The proposed point of interconnection is at SnoPUD's existing Hardeson Substation. In order to integrate the proposed generation, BPA and SnoPUD would enter into...

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Chemical looping combustion of coal in interconnected fluidized beds  

Science Journals Connector (OSTI)

Chemical looping combustion is the indirect combustion by use of oxygen carrier. It can...2...capture in power generating processes. In this paper, chemical looping combustion of coal in interconnected fluidized ...

LaiHong Shen; Min Zheng; Jun Xiao; Hui Zhang

2007-04-01T23:59:59.000Z

202

Perspectives on the metallic interconnects for solid oxide fuel cells  

Science Journals Connector (OSTI)

The various stages and progress in the development of interconnect materials for solid oxide fuel cells (SOFCs) over the last two decades are reviewed. The criteria for the application of materials as intercon...

Wei-zhong Zhu; Mi Yan

2004-12-01T23:59:59.000Z

203

5 F 13 Optica1 Interconnection T ransmitter Power BER  

E-Print Network [OSTI]

¼ 5¸ ¤ ü ? ø Ð Ð ú ¸ ? í ® F? 13 Optica1 Interconnection? T ransmitter Power Í BER? ? û - ¡ ü ?

Choi, Woo-Young

204

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities  

Broader source: Energy.gov [DOE]

The Energy Department today released the first National Offshore Wind Energy Grid Interconnection Study that investigated the key economic and technological factors that will influence the integration of offshore wind energy onto the national grid.

205

Interconnect modeling and optimization in deep sub-micron technologies  

E-Print Network [OSTI]

Interconnect will be a major bottleneck for deep sub-micron technologies in the years to come. This dissertation addresses the communication aspect from a power consumption and transmission speed perspective. A model for ...

Sotiriadis, Paul Peter P. (Paul Peter Peter-Paul), 1973-

2002-01-01T23:59:59.000Z

206

Design and analysis of high performance multistage interconnection networks  

E-Print Network [OSTI]

an analytical model to compare its performance with the existing designs reported in the literature. We validate on model with extensive simulation studies. Index Terms - Multistage interconnection networks, packet switching, static buffer allocation, dynamic...

Bhogavilli, Suresh K

2012-06-07T23:59:59.000Z

207

Topic B Awardee: Eastern Interconnection States' Planning Council  

Broader source: Energy.gov [DOE]

TheEastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the...

208

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration (Desert Southwest Region) is preparing an EA that will assess the potential environmental impacts of a proposal to interconnect the planned Ridgenose Solar Energy Project to Westerns transmission system. Westerns actions could include constructing less than a mile of new transmission line from the solar facility to an existing substation, constructing an interconnection substation, and adding, moving, or modifying structures.

209

Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid  

SciTech Connect (OSTI)

The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.

Kou, Gefei [ORNL; Hadley, Stanton W [ORNL; Markham, Penn N [ORNL; Liu, Yilu [ORNL

2013-12-01T23:59:59.000Z

210

Integrated Energy-Water Planning in the Western and Texas Interconnections  

SciTech Connect (OSTI)

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

Vincent Tidwell; John Gasper; Robert Goldstein; Jordan Macknick; Gerald Sehlke; Michael Webber; Mark Wigmosta

2013-07-01T23:59:59.000Z

211

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

212

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

213

Cost Shifting  

Science Journals Connector (OSTI)

Abstract Cost shifting exists when a provider raises prices for one set of buyers because it has lowered prices for some other buyer. In theory, cost shifting can take place only if providers have unexploited market power. The empirical evidence on the extent of cost shifting is mixed. Taken as a whole, the evidence does not support the claims that cost shifting is a large and pervasive feature of the US health-care markets. At most, one can argue that perhaps one-fifth of Medicare payment reductions have been passed on to private payers. The majority of the rigorous studies, however, have found no evidence of cost shifting.

M.A. Morrisey

2014-01-01T23:59:59.000Z

214

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

215

cost savings  

National Nuclear Security Administration (NNSA)

reduced the amount of time involved in the annual chemical inventory for a cost savings of 18,282. Other presentations covered SRNS' award-winning employee suggestion...

216

BPA's Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPAsCosts Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance & Rates...

217

Mixed-mode singularity and temperature effects on dislocation nucleation in strained interconnects  

SciTech Connect (OSTI)

Dislocations can be nucleated from sharp geometric features in strained interconnects due to thermal expansion coefficient mismatch, lattice mismatch, or stresses that arise during material processing. The asymptotic stress fields near the edge root can be described by mixed-mode singularities, which depend on the dihedral angle and material properties, and a transverse T-stress, which depends on how residual stress is realized in the interconnects. The critical condition for stress nucleation can be determined when an appropriate measure of the stress intensity factors (SIFs) reaches a critical value. Such a method, however, does not offer an explicit picture of the dislocation nucleation process so that it has difficulties in studying complicated structures, mode mixity effects, and more importantly the temperature effects. Based on the Peierls concept, a dislocation can be described by a continuous slip field, and the dislocation nucleation condition corresponds when the total potential energy reaches a stationary state. Through implementing this ad hoc interface model into a finite element framework, it is found that dislocation nucleation becomes more difficult with the increase of mode mixity and T-stress, or the decrease of the width-to-height ratio of the surface pad, while the shape of the surface pad, being a square or a long line, plays a less important role. The Peierls dislocation model also allows us to determine the activation energy, which is the energy needed for the thermal activation of a dislocation when the applied load is lower than the athermal critical value. The calculated saddle point configuration compares favorably the molecular simulations in literature. Suggestions on making immortal strained interconnects are provided.

Lee, Jinhaeng [University of Tennessee, Knoxville (UTK); Gao, Yanfei [ORNL

2011-01-01T23:59:59.000Z

218

National Electric Transmission Study 2006 Western Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Western Interconnection Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006 2 Western Interconnection 2006 Congestion Study - DOE Task 3 - 1. 2008 Modeling Study 2. 2015 Modeling Study - 2015 Planned Resource Development (IRPs and RPS) 3. W.I. Historical Path Usage Studies - 1999 thru 2005 - Physical congestion - Commercial congestion 3 WCATF Modeling Studies ABB Gridview Model * Model uses WECC 2005 L&R load forecast, modified with NPCC data for the NW, RMATS load forecasts for the Rocky Mtn area and the latest CEC load forecast for California * Hourly load shapes were developed using FERC 714 * Incremental transmission was added to a WECC 2008 case to represent 2015 network topology * WECC path ratings were used, modified as necessary to more closely

219

EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

34: Hualapai Valley Solar Interconnection Project, Arizona 34: Hualapai Valley Solar Interconnection Project, Arizona EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona Overview Hualapai Valley Solar, LLC, proposes to construct, operate and maintain a 340-megawatt, solar-powered generating facility in Mohave County, near Kingman, Ariz. The proposed project would use concentrating solar-power-trough technology to capture the sun's heat to make steam, which would power a traditional steam turbine generator. Proposed infrastructure would consist of a solar field, power block, thermal energy storage system, substation site, transmission line, temporary laydown areas and other ancillary facilities. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

220

Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrodeposited Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects H. McCrabb * , T. Hall * , J. Wu # , H. Zhang # , X. Liu # , E.J. Taylor * * Faraday Technology Inc., 315 Huls Dr., Clayton, OH 45315, USA # West Virginia University, Dept. of Mechanical and Aerospace Eng.ESB, Morgantown, WV, 26506, USA Overall Objective Overall Objective Principal Investigator: Heather McCrabb, Company Name: Faraday Technology, Inc., Address: 315 Huls Drive, Clayton, OH 45315, Phone: 937-836-7749, E-mail: heathermccrabb@faradaytechnology.com, Company website: faradaytechnology.com Previous Work at WVU Results Develop an inexpensive manufacturing process for depositing (Mn,Co) 3 O 4 spinel coatings onto SOFC interconnects. Introduction The decrease in the SOFC operating temperatures from 1000°C to between 650 and 850°C has enabled the use of chromia-forming ferritic stainless steels as interconnects

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Renewable Energy Interconnection and Storage - Technical Aspects | Open  

Open Energy Info (EERE)

Renewable Energy Interconnection and Storage - Technical Aspects Renewable Energy Interconnection and Storage - Technical Aspects Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Renewable_Energy_Interconnection_and_Storage_-_Technical_Aspects&oldid=514543"

222

Graphene interconnects fully encapsulated in layered insulator hexagonal boron nitride  

Science Journals Connector (OSTI)

We demonstrate improvements in the electrical performance of graphene interconnects with full encapsulation by lattice-matching layered insulator, hexagonal boron nitride (h-BN). A novel layer-based transfer method is developed to assemble the top passivating layer of h-BN on the graphene surface to construct the h-BN/graphene/h-BN heterostructures. The encapsulated graphene interconnects (EGIs) are characterized and compared with graphene interconnects on either SiO2 or h-BN substrates with no top passivating h-BN layer. We observe significant improvements in both the maximum current density and breakdown voltage in EGIs. Compared with the uncovered structures, EGIs also show an appreciable increase (~67%) in power density at breakdown. These improvements are achieved without degrading the carrier transport characteristics in graphene wires. In addition, EGIs exhibit a minimal environment impact, showing electrical behavior insensitive to ambient conditions.

Nikhil Jain; Chris A Durcan; Robin Jacobs-Gedrim; Yang Xu; Bin Yu

2013-01-01T23:59:59.000Z

223

National Electric Transmission Congestion Study 2006 Eastern Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Memorandum To: Poonum Agrawal, David Meyer, U.S. Department of Energy CRA No. D08554-00 From: Prashant Murti, Alex Rudkevich, CRA International Date: Finalized March 13, 2006 Subject: GE MAPS INPUT ASSUMPTIONS: EASTERN INTERCONNECT This memorandum summarizes salient inputs to the CRA locational price forecasting model (GE MAPS). The model geographic footprint encompasses the US portion of the Eastern Interconnect and the Canadian province of Ontario. The analyses simulate the years 2008 and 2011. Primary data sources for the CRA GE MAPS model include the NERC MMWG, the General Electric generation and transmission databases for the Eastern Interconnect, various publications by NERC regions and Independent System Operators, FERC submissions by generation and transmission owners,

224

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

225

STABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS  

E-Print Network [OSTI]

, with energy imbalance in the physical system, with or without network congestion, driving the market responseSTABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS F.L. Alvarado1 J University of Paraiba, Brazil Abstract: The use of market mechanisms to determine gen- eration dispatch

226

Energy and Reliability in Future NOC Interconnected CMPS  

E-Print Network [OSTI]

In this dissertation, I explore energy and reliability in future NoC (Network-on-Chip) interconnected CMPs (chip multiprocessors) as they have become a first-order constraint in future CMP design. In the first part, we target the root cause...

Kim, Hyungjun

2013-08-01T23:59:59.000Z

227

Solar Energy to Benefit from New FERC Interconnection Procedures  

Office of Energy Efficiency and Renewable Energy (EERE)

As a major win for solar and testament to the impact of Department of Energys SunShot Initiative funded research at the national labs, this past month Federal Energy Regulatory Commission announced the adoption of new fast track rules to make the interconnection process dramatically cheaper and faster for small wholesale energy projects, representing a major improvement with nationwide impacts.

228

Hermetic aluminum radio frequency interconnection and method for making  

DOE Patents [OSTI]

The present invention provides a light-weight, hermetic coaxial radio-frequency (RF) interconnection having an electrically conductive outer housing made of aluminum or an aluminum alloy, a central electrical conductor made of ferrous or non-ferrous material, and a cylinder of dielectric material comprising a low-melting-temperature, high-thermal-expansion aluminophosphate glass composition for hermetically sealing between the aluminum-alloy outer housing and the ferrous or non-ferrous center conductor. The entire RF interconnection assembly is made permanently hermetic by thermally fusing the center conductor, glass, and housing concurrently by bringing the glass to the melt point by way of exposure to an atmospheric temperature sufficient to melt the glass, less than 540.degree. C., but that does not melt the center conductor or the outer aluminum or aluminum alloy housing. The composition of the glass used is controlled to provide a suitable low dielectric constant so that an appropriate electrical characteristic impedance, for example 50 ohms, can be achieved for an electrical interconnection that performs well at high radio frequencies and also provides an interconnection maintaining a relatively small physical size.

Kilgo, Riley D. (Albuquerque, NM); Kovacic, Larry (Albuquerque, NM); Brow, Richard K. (Rolla, MO)

2000-01-01T23:59:59.000Z

229

Optimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects  

E-Print Network [OSTI]

tapering is shown to reduce the (a CMOS inverter) with the driver (a CMOS inverter). The power dissipatedOptimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects Magdy A. El-Moursy and Eby G. Friedman Department of Electrical and Computer Engineering University of Rochester Rochester, New

Friedman, Eby G.

230

Lumped Electro-Thermal Model of On-chip Interconnects  

E-Print Network [OSTI]

, among other effects, an increase of electrical resistivity of metal inter- connect and thus of operating frequency has dramatically magnified the electrical power density leading to a signifi- cant tools in fact model interconnections by discretizing them in a set of elementary subsections and thus

Paris-Sud XI, Université de

231

Preliminary Response of PJM Interconnection, L.L.C. to the Operating...  

Broader source: Energy.gov (indexed) [DOE]

Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant...

232

A new cost model for performance comparison of interconnection networks using adaptive wormhole routing  

E-Print Network [OSTI]

Sarbazi-Azad,H. Ould-Khaoua,M. Mackenzie,L.M. Proc. IASTED Int'l Symposium on Parallel and Distributed Computing and Networks (PDCN'2002), Innsbruck, Austria, 18-21 Feb., 2000. pp 314-319 ACTA Press

Sarbazi-Azad, H.

233

Production Cost Modeling of Cogenerators in an Interconnected Electric Supply System  

E-Print Network [OSTI]

The Optimal State Electricity Supply System in Texas (OSEST) research project is part of the continuing Public Utility Commission of Texas (PUCT) effort to identify possible improvements in the production, transmission, and use of electricity...

Ragsdale, K.

234

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning- June 6, 2013  

Broader source: Energy.gov [DOE]

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

235

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked processor  

E-Print Network [OSTI]

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked of free-space optical interconnect for the three-dimensional optoelectronic stacked processor (3DOESP) has VLSI; Optoelectronics; VCSELs 1. Introduction Current electronic interconnection technology cannot keep

Esener, Sadik C.

236

A novel framework for exploring 3-D FPGAs with heterogeneous interconnect fabric  

Science Journals Connector (OSTI)

A heterogeneous interconnect architecture can be a useful approach for the design of 3-D FPGAs. A methodology to investigate heterogeneous interconnection schemes for 3-D FPGAs under different 3-D fabrication technologies is proposed. Application of ... Keywords: 3-D integration, 3-D reconfigurable architectures, FPGAs, design framework, interconnection fabric

Kostas Siozios; Vasilis F. Pavlidis; Dimitrios Soudris

2012-03-01T23:59:59.000Z

237

Integration of a waveguide self-electrooptic effect device and a vertically coupled interconnect waveguide  

DOE Patents [OSTI]

A self-electrooptic effect device ("SEED") is integrated with waveguide interconnects through the use of vertical directional couplers. Light initially propagating in the interconnect waveguide is vertically coupled to the active waveguide layer of the SEED and, if the SEED is in the transparent state, the light is coupled back to the interconnect waveguide.

Vawter, G. Allen (Corrales, NM)

2008-02-26T23:59:59.000Z

238

Electricity costs  

Science Journals Connector (OSTI)

... index is used to correct for inflation. The short answer is given by the Central Electricity Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The ... Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The cost per kWh of fuel. . . rose by 18.6 per cent (between 1979 ...

J.W. JEFFERY

1982-03-18T23:59:59.000Z

239

PJM Interconnection, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

LLC Smart Grid Project LLC Smart Grid Project Jump to: navigation, search Project Lead PJM Interconnection, LLC Country United States Headquarters Location Norristown, Pennsylvania Additional Benefit Places Illinois, Indiana, Kentucky, Maryland, Michigan, North Carolina, New Jersey, Ohio, Pennsylvania, Virgin Islands, West Virginia Recovery Act Funding $13,698,091.00 Total Project Value $228203511 Coverage Area Coverage Map: PJM Interconnection, LLC Smart Grid Project Coordinates 40.121497°, -75.3399048° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

240

Geothermal Power and Interconnection: The Economics of Getting to Market  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power and Power and Interconnection: The Economics of Getting to Market David Hurlbut Technical Report NREL/TP-6A20-54192 April 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut Prepared under Task No. WE11.0815 Technical Report NREL/TP-6A20-54192 April 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Impact of High Solar Penetration in the Western Interconnection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of High Solar Penetration Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Technical Report NREL/TP-5500-49667 December 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Prepared under Task No. SM101610

242

EIS-0435: Modification of the Groton Generation Station Interconnection  

Broader source: Energy.gov (indexed) [DOE]

5: Modification of the Groton Generation Station 5: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota EIS-0435: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Summary This EIS evaluates the environmental impacts of a proposal for DOE's Western Area Power Administration to modify its Large Generator Connection Agreement for the Groton Generation Station in Brown County, South Dakota. The modification would allow Basin Electric Power Cooperative, which operates the generation station, to produce power above the current operating limit of 50 average megawatts. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download June 3, 2011 EIS-0435: Final Environmental Impact Statement

243

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

244

Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. |  

Broader source: Energy.gov (indexed) [DOE]

and Initial Comments of PJM Interconnection, and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. On January 5, 2009, ITC Transmission filed with the Department of Energy a request to amend Presidential Permit PP-230-3, which authorizes ITC to own and operate specified electric transmission facilities at the Bunce Creek station that interconnect ITC with Hydro One Networks Inc electric transmission facilities at the Michigan-Ontario border. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of

245

GRR/Section 8-TX-b - ERCOT Interconnection | Open Energy Information  

Open Energy Info (EERE)

8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection Process.pdf Click to View Fullscreen Regulations & Policies PUCT Substantive Rule 25.198 Triggers None specified Click "Edit With Form" above to add content 8-TX-b - ERCOT Interconnection Process.pdf 8-TX-b - ERCOT Interconnection Process.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedures for interconnection with Electricity Reliability Council of Texas (ERCOT) in Texas. According to PUCT Substantive Rule 25.198, the responsibility for

246

Power System Study for Renewable Energy Interconnection in Malaysia  

Science Journals Connector (OSTI)

The renewable energy (RE) sector has grown exponentially in Malaysia with the introduction of the Feed-In-Tariff (FIT) by the Ministry of Energy, Green Technology and Water. Photovoltaic, biogas, biomass and mini hydro are among the renewable energy sources which offer a lucrative tariff to incite developers in taking the green technology route. In order to receive the FIT, a developer is required by the utility company to perform a power system analysis which will determine the technical feasibility of an RE interconnection to the utility company's existing grid system. There are a number of aspects which the analysis looks at, the most important being the load flow and fault levels in the network after the introduction of an RE source. The analysis is done by modelling the utility company's existing network and simulating the network with the interconnection of an RE source. The results are then compared to the values before an interconnection is made as well as ensuring the voltage rise or the increase in fault levels do not violate any pre-existing regulations set by the utility company. This paper will delve into the mechanics of performing a load flow analysis and examining the results obtained.

O F Askar; V K Ramachandaramurthy

2013-01-01T23:59:59.000Z

247

Corrosion of Metallic SOFC Interconnects in Coal Syngas  

SciTech Connect (OSTI)

With recent reductions in the operating temperature of Solid Oxide Fuel Cells (SOFC), the potential of using metallic interconnect has gone up. There is also an interest in using Coal syngas as the fuel gas and thus there is a need to analyze the behavior and performance of metallic interconnects when exposed to Coal syngas. Three high temperature material alloys, Crofer 22 APU, Ebrite and Haynes 230, having the potential to be used as SOFC interconnects were studied in simulated wet coal syngas. These alloys were exposed to syngas at 800 degrees C and for 100 hours. The exposure to coal syngas led to the formation of oxides and spinels, which evidently led to an increase in electrical resistance. Oxidation in a reducing and carburizing environment leads to unique phase and morphology formations. A comparative analysis was carried out for all the three alloys, wherein the samples were characterized by using SEM, EDS, Raman and X-Ray diffraction to obtain the morphology, thickness, composition and crystal structure of the oxides and spinels

Dastane, R.R. (University of West Virginia); Liu, X. (University of West Virginia); Johnson, C., Mao, Scott (University of Pittsburgh)

2007-09-01T23:59:59.000Z

248

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable) costs apply

Boisvert, Jeff

249

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408 ­ off-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable

Boisvert, Jeff

250

BI-LAYER p-n JUNCTION INTERCONNECTIONS FOR COAL BASED SOLID OXIDE FUEL CELLS  

SciTech Connect (OSTI)

In this report, a new approach for lower operating temperature solid oxide fuel cells (SOFCs) interconnections (IC) consisting of a bi-layer structure is proposed and analyzed. The bi-layer structure consists of a p-type layer exposed to cathodic gas (air/oxygen) and an n-type layer exposed to anodic gas (fuel). It is theoretically shown that the interfacial oxygen partial pressure which is an important design variable, is dependent primarily on the oxygen partial pressure gradient across the IC, the low level oxygen conductivities of the two layers and is largely independent of their electronic conductivities and the total current density through the IC material. Experimental difficulties in fabricating bi-layer structures are presently being addressed.

Srikanth Gopalan

2005-01-29T23:59:59.000Z

251

DC electrodeposition of MnCo alloys on stainless steels for SOFC interconnect application  

SciTech Connect (OSTI)

High conductivity coatings that resist oxide scale growth and reduce chromium evaporation are needed to make stainless steel interconnect materials viable for long-term stable operation of solid oxide fuel cells (SOFC). Mn1.5Co1.5O4 spinel is one of the most promising coatings for interconnect application because of its high conductivity, good chromium retention capability, as well as good CTE match to ferritic stainless steels. MnCo electrodeposition followed by oxidization is potentially a low cost method for fabrication of (Mn,Co)3O4 spinel coatings. This work looks at the co-deposition of MnCo alloys for this application. As a guide to optimize the deposition process, characterizations of the cathodic reactions and reaction potentials are done using polarization curves. It was found that as cobalt concentration was varied that the alloy composition became richer in cobalt, indicating that the deposition is regular co-deposition process. It was also found that at 0.05M Co concentration in excess gluconate the MnCo alloys composition could be tuned by varying the current density. Coatings with MnCo around 1:1 could be obtained at a current density of 250 mA/cm2. However, the higher potential increased hydrogen production making the films more porous. Oxidation of the alloy coatings showed that much of the porosities could be eliminated during oxidation. It was found in a number of samples that fully dense coatings where obtained. The composition of the oxidized coating was found to become enriched in Mn, possibly due to the Mn fast diffusion from the substrate.

Wu, Junwei; Jiang, Yinglu; Johnson, Christopher; Liu, Xingbo

2008-03-01T23:59:59.000Z

252

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

253

Direct costing  

E-Print Network [OSTI]

oau 5e reduced. Under the same oonOitions, even ~Me on a bread scale entails not mere1y the conduct of the direct oyeraticns cf yrccessing the materials into finished products, but also the performance of auxiliary functions. these may 'ba power y... purposes have been advanced as folkway le Most of a o03RyaxO' 8 products Grc usual13r sold at prices which oovex' full product costs y plus 861ling a%el administrative expenses, plus normal profit. The inventoi~ valuate. on should be consistent...

Browning, Donald Bullock

2012-06-07T23:59:59.000Z

254

Cost Analysis Rate Settin  

E-Print Network [OSTI]

Cost Analysis and Rate Settin for Animal Research Facilities #12;#12;Cost Analysis and Rate ... .. . ...................... . . . ................................. . .... 7 Chapter 2 Preparation for Cost Analysis ......................................................... 9 Chapter 3 Assignment of Costs to Animal Research Facility Cost Centers

Baker, Chris I.

255

Production process for advanced space satellite system cables/interconnects.  

SciTech Connect (OSTI)

This production process was generated for the satellite system program cables/interconnects group, which in essences had no well defined production process. The driver for the development of a formalized process was based on the set backs, problem areas, challenges, and need improvements faced from within the program at Sandia National Laboratories. In addition, the formal production process was developed from the Master's program of Engineering Management for New Mexico Institute of Mining and Technology in Socorro New Mexico and submitted as a thesis to meet the institute's graduating requirements.

Mendoza, Luis A.

2007-12-01T23:59:59.000Z

256

Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)  

SciTech Connect (OSTI)

This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-10-01T23:59:59.000Z

257

EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town  

Broader source: Energy.gov (indexed) [DOE]

84: Invenergy Interconnection for the Wray Wind Energy 84: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO Summary DOE's Western Area Power Administration prepared this EA to evaluate the environmental impacts of interconnecting the proposed Wray Wind Energy Project, for approximately 90 megawatts of wind generation, to Western's existing Wray Substation in Yuma County, Colorado. Public Comment Opportunities None available at this time. Documents Available for Download December 27, 2012 EA-1884: Finding of No Significant Impact Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO December 27, 2012 EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray,

258

GRR/Section 8-TX-c - Distributed Generation Interconnection | Open Energy  

Open Energy Info (EERE)

GRR/Section 8-TX-c - Distributed Generation Interconnection GRR/Section 8-TX-c - Distributed Generation Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-c - Distributed Generation Interconnection 8-TX-c - Distributed Generation Interconnection.pdf Click to View Fullscreen Contact Agencies Public Utility Commission of Texas Regulations & Policies PUCT Substantive Rule 25.211 PUCT Substantive Rule 25.212 Triggers None specified Click "Edit With Form" above to add content 8-TX-c - Distributed Generation Interconnection.pdf 8-TX-c - Distributed Generation Interconnection.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the process for distributed generation (DG)

259

Cost Sharing What is Cost Sharing?  

E-Print Network [OSTI]

1 Cost Sharing What is Cost Sharing? x Cost sharing is a commitment to use university resources and Expenses o Equipment x Committing to cost share is highly discouraged unless required by the sponsoring agency x Tracking of committed cost share is required to meet federal regulations (OMB A-110) x UCSD has

Tsien, Roger Y.

260

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network [OSTI]

energy costs, CO 2 emissions, or multiple objectives of providing services to a building microgrid produces technology neutral

Stadler, Michael

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Generation Interconnection Policies and Wind Power: A Discussion of Issues, Problems, and Potential Solutions  

SciTech Connect (OSTI)

This report describes the adoption and implementation of FERC Order 2003 and the reasons for the sharp rise in generation interconnection filings in recent years.

Porter, K.; Fink, S.; Mudd, C.; DeCesaro, J.

2009-01-01T23:59:59.000Z

262

Comparing Germany's and California's Interconnection Processes for PV Systems (White Paper)  

SciTech Connect (OSTI)

Establishing interconnection to the grid is a recognized barrier to the deployment of distributed energy generation. This report compares interconnection processes for photovoltaic projects in California and Germany. This report summarizes the steps of the interconnection process for developers and utilities, the average length of time utilities take to process applications, and paperwork required of project developers. Based on a review of the available literature, this report finds that while the interconnection procedures and timelines are similar in California and Germany, differences in the legal and regulatory frameworks are substantial.

Tweedie, A.; Doris, E.

2011-07-01T23:59:59.000Z

263

Energy Requirement and Speed Analysis of Electrical and Free-Space Optical Digital Interconnections  

Science Journals Connector (OSTI)

Scaling of VLSI technology has been dramatically increasing microelectronic device densities and speeds. However, the interconnection technology between devices does not advance proportionally. Limited available ...

Gke I. Yayla; Philippe J. Marchand

1998-01-01T23:59:59.000Z

264

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2010-01-01T23:59:59.000Z

265

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2009-01-01T23:59:59.000Z

266

Optical Digital Audio Interconnect Based on Organic Light Emitting Diodes and Organic Photodiodes  

Science Journals Connector (OSTI)

An optical interconnect using solely organic optoelectronic components is presented. Careful optimization of the organic light emitting diodes and photodiodes allows us to successfully...

Valouch, Sebastian; Punke, Martin; Kettlitz, Siegfried W; Lemmer, Uli; Gerken, Martina

267

Electrical isolation of component cells in monolithically interconnected modules  

DOE Patents [OSTI]

A monolithically interconnected photovoltaic module having cells which are electrically connected which comprises a substrate, a plurality of cells formed over the substrate, each cell including a primary absorber layer having a light receiving surface and a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, and a cell isolation diode layer having a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, the diode layer intervening the substrate and the absorber layer wherein the absorber and diode interfacial regions of a same conductivity type orientation, the diode layer having a reverse-breakdown voltage sufficient to prevent inter-cell shunting, and each cell electrically isolated from adjacent cells with a vertical trench trough the pn-junction of the diode layer, interconnects disposed in the trenches contacting the absorber regions of adjacent cells which are doped an opposite conductivity type, and electrical contacts.

Wanlass, Mark W. (Golden, CO)

2001-01-01T23:59:59.000Z

268

Cost Sharing Basics Definitions  

E-Print Network [OSTI]

Cost Sharing Basics Definitions Some funding agencies require the grantee institution the project costs. Cost sharing is defined as project costs not borne by the sponsor. Cost sharing funds may resources or facilities. If the award is federal, only acceptable non-federal costs qualify as cost sharing

Finley Jr., Russell L.

269

FULL-COST ACCOUNTING  

Science Journals Connector (OSTI)

FULL-COST ACCOUNTING ... Environmental costs would be built into a product's cost, and consumers would be able to make informed purchases. ...

1993-01-11T23:59:59.000Z

270

An empirical study of the economies of scale in AC transmission line construction costs  

E-Print Network [OSTI]

1 An empirical study of the economies of scale in AC transmission line construction costs Krishnan the interconnection (Western, ERCOT, Eastern) in which the transmission was built, and · the capacity of the line. We the change in "Available Transmission Capability" (ATC) [4] between the cases of having the line in and out

Baldick, Ross

271

Cost-Effectiveness Ratio  

Science Journals Connector (OSTI)

The cost?effectiveness ratio (CER) is acalculation that summarizes the intervention's net cost and effectiveness. The three types of CER are: the average cost?effectiveness ratio (ACER), the marginal cost?...

2008-01-01T23:59:59.000Z

272

Cost Share-Cost Reimbursement Invoice Format Example | The Ames...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Share-Cost Reimbursement Invoice Format Example Effective Date: 102014 File (public): Cost Share-Cost...

273

Free-Space optical interconnects for cable-less readout in particle physics detectors  

SciTech Connect (OSTI)

Particle physics detectors utilize readout data links requiring a complicated network of copper wires or optical fibers. These links are both massive and costly. Upgrades to such detectors may require additional bandwidth to be provisioned with limited space available to route new cables or fibers. In contrast, free-space optical interconnects will offer cable-less readout, thereby resulting in significant reductions of material and labor. A collaborative effort between Fermilab and Vega Wave Systems is pursuing the development of a unique free-space optical link design that utilizes the transparency of silicon at wavelengths including 1310 nm and multiple wavelengths used in standard telecommunications applications such as coarse wavelength division multiplexing (CWDM). The first step in the pursuit of that design is a proof that the concept may be viable. To that end, experiments have been performed to characterize the bit error rate performance of a prototype link over a free-space optical path and through doped silicon at multi-gigabit rates. These experiments have demonstrated that operation within acceptable bit error rates is possible using single and multiple wavelength transmission arrangements.

Chramowicz, John; Kwan, Simon; /Fermilab; Moretti, Tony; Sugg, Alan; Prosser, Alan; /Fermilab

2010-10-01T23:59:59.000Z

274

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line- based communication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Wu, Hui

275

Predictions, Challenges, and Opportunities in CMOS Compatible On-Chip Optical Interconnect  

E-Print Network [OSTI]

to a few picoseconds. IV. ELECTRICAL VS. OPTICAL INTERCONNECTS Different criteria used in the design of the . Friedman Department of Electrical and Computer Engineering University of Rochester, Rochester, New York for electrical interconnect. Predictions of the performance of CMOS compatible optical devices are made based

Friedman, Eby G.

276

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores  

E-Print Network [OSTI]

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores Li Chen on long interconnects and must be addressed during manufacturing testing. External testing for crosstalk is expensive due to the need for high-speed testers. Built-in self-test, while eliminating the need for a high

California at San Diego, University of

277

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link  

E-Print Network [OSTI]

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link a technique that enables the extraction and modeling of some of the channel's optoelectronic characteristics and optoelectronic com- ponents utilized in the link. 1. Introduction In the last decade optical interconnects have

Esener, Sadik C.

278

The Impact of Dynamic Directories on Multicore Interconnects MATT SCHUCHHARDT, Northwestern University  

E-Print Network [OSTI]

consumption by up to 37.3% (22.9% on average for scientific workloads, and 8.0% for Map-Reduce). 1 Directories on the performance, power, and energy consumption of a multicore processor. We show its. This eliminates a large fraction of on-chip interconnect traversals, thus reducing interconnect power and energy

Kuzmanovic, Aleksandar

279

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line-based commu- nication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Huang, Michael C.

280

Federal Utility Partnership Working Group - Utility Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

WORKING GROUP - Utility Interconnection Panel M. Renee Jewell, Program/Energy Manager, & Contracting Officer, Forest Service (reneejewell@fs.fed.us) SCENARIO: Fed Agencies had Solar PV Projects To Connect with Utility in California * United States (US) Forest Service (FS) - 1 small Solar Photovoltaic (PV) project; and - 1 small Renewable project (Solar PV) exporting energy to grid. * U.S. National Park Service (NPS) - 24 Small Solar Photovoltaic projects. * U.S. Dept. of Veterans Affairs (VA) - 6 Renewable generation projects of different sizes. FS Region 5 (California) - Solar Photovoltaic Installations Solar PV Project @ Mono Lake Visitor Center (Inyo NF) Solar PV Project (net exporter) @ San Dimas Technology and Development Center SITUATION - Utility Wanted Feds to Sign Its

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Geothermal Power and Interconnection: The Economics of Getting to Market  

SciTech Connect (OSTI)

This report provides a baseline description of the transmission issues affecting geothermal technologies. The report begins with a comprehensive overview of the grid, how it is planned, how it is used, and how it is paid for. The report then overlays onto this 'big picture' three types of geothermal technologies: conventional hydrothermal systems; emerging technologies such as enhanced engineered geothermal systems (EGS) and geopressured geothermal; and geothermal co-production with existing oil and gas wells. Each category of geothermal technology has its own set of interconnection issues, and these are examined separately for each. The report draws conclusions about each technology's market affinities as defined by factors related to transmission and distribution infrastructure. It finishes with an assessment of selected markets with known geothermal potential, identifying those that offer the best prospects for near-term commercial development and for demonstration projects.

Hurlbut, D.

2012-04-01T23:59:59.000Z

282

Catalytic bipolar interconnection plate for use in a fuel cell  

DOE Patents [OSTI]

A bipolar interconnection plate for use between adjacent fuel cell units in a stacked fuel cell assembly. Each plate is manufactured from an intermetallic composition, examples of which include NiAl or Ni.sub.3 Al which can catalyze steam reforming of hydrocarbons. Distributed within the intermetallic structure of the plate is a ceramic filler composition. The plate includes a first side with gas flow channels therein and a second side with fuel flow channels therein. A protective coating is applied to the first side, with exemplary coatings including strontium-doped or calcium-doped lanthanum chromite. To produce the plate, Ni and Al powders are combined with the filler composition, compressed at a pressure of about 10,000-30,000 psi, and heated to about 600.degree.-1000.degree. C. The coating is then applied to the first side of the completed plate using liquid injection plasma deposition or other deposition techniques.

Lessing, Paul A. (Idaho Falls, ID)

1996-01-01T23:59:59.000Z

283

Gold-based electrical interconnections for microelectronic devices  

DOE Patents [OSTI]

A method of making an electrical interconnection from a microelectronic device to a package, comprising ball or wedge compression bonding a gold-based conductor directly to a silicon surface, such as a polysilicon bonding pad in a MEMS or IMEMS device, without using layers of aluminum or titanium disposed in-between the conductor and the silicon surface. After compression bonding, optional heating of the bond above 363 C. allows formation of a liquid gold-silicon eutectic phase containing approximately 3% (by weight) silicon, which significantly improves the bond strength by reforming and enhancing the initial compression bond. The same process can be used for improving the bond strength of Au--Ge bonds by forming a liquid Au-12Ge eutectic phase.

Peterson, Kenneth A. (Albuquerque, NM); Garrett, Stephen E. (Albuquerque, NM); Reber, Cathleen A. (Corrales, NM); Watson, Robert D. (Tijeras, NM)

2002-01-01T23:59:59.000Z

284

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings  

Broader source: Energy.gov (indexed) [DOE]

37: Interconnection of the Buffalo Ridge III Wind Project, 37: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota Summary This EIS evaluates the environmental impacts of a proposal to interconnect the Heartland Wind, LLC, proposed Buffalo Ridge III Wind Project in Brookings and Deuel Counties, South Dakota, to DOE's Western Area Power Administration transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 29, 2012 EIS-0437: Notice of Cancellation of an Environmental Impact Statement Proposed Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD

285

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project,  

Broader source: Energy.gov (indexed) [DOE]

8: Interconnection of the Proposed Hermosa West Wind Farm 8: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY SUMMARY This EIS will evaluate the environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, with DOE's Western Area Power Administration's existing Craig-Ault 345-kilovolt transmission line. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 5, 2012 EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY January 14, 2010 EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings

286

SunShot Initiative: Reducing Non-Hardware Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reducing Non-Hardware Costs Reducing Non-Hardware Costs DOE supports efforts to dramatically reduce the non-hardware, balance of systems costs associated with solar energy systems. Representing as much as 64% of the total installed system price, these "soft costs" include: Customer Acquisition Financing and Contracting Permitting, Interconnection, and Inspection Installation and Performance Operations and Maintenance. To meet SunShot goals, the industry must innovate new ways to automate and speed processes that make it easier for consumers, businesses, utilities, solar companies, and others to install solar projects. For example, novel software solutions now allow solar companies to design systems and provide accurate quotes using satellite images rather than conducting full site visits.

287

p r o g r e s s r e p o r t s Interconnect: A Fundamental Constraint  

E-Print Network [OSTI]

the greatest amounts of area, delay, and energy. With interconnection require- ments scaling faster than. Since typical, logical communication structures have interconnection demands that are greater than two-dimensional VLSI substrates naturally sup- port, interconnection requirements grow faster than logic and become

Haile, Sossina M.

288

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

289

Non-Hardware ("Soft") Cost-Reduction Roadmap for Residential and Small Commercial Solar Photovoltaics, 2013-2020  

SciTech Connect (OSTI)

The objective of this analysis is to roadmap the cost reductions and innovations necessary to achieve the U.S. Department of Energy (DOE) SunShot Initiative's total soft-cost targets by 2020. The roadmap focuses on advances in four soft-cost areas: (1) customer acquisition; (2) permitting, inspection, and interconnection (PII); (3) installation labor; and (4) financing. Financing cost reductions are in terms of the weighted average cost of capital (WACC) for financing PV system installations, with real-percent targets of 3.0% (residential) and 3.4% (commercial).

Ardani, K.; Seif, D.; Margolis, R.; Morris, J.; Davidson, C.; Truitt, S.; Torbert, R.

2013-08-01T23:59:59.000Z

290

Study of metallic materials for solid oxide fuel cell interconnect applications.  

SciTech Connect (OSTI)

Metallic interconnect acts as a gas separator and a gas distributor and therefore, it needs to function adequately in two widely different environments. The interconnect material will be exposed to air on one side and natural gas or coal-derived synthesis gas on the other side. The viable material for the interconnect application must be resistant not only to oxidation but also carburization in hydrocarbon containing low-oxygen environments. In addition, the scales that develop on the exposed surfaces must possess adequate electrical conductivity for them to function as current leads over long service life of the fuel cell. This report addresses five topics of interest for the development of metallic interconnects with adequate performance in fuel cells for long service life. The research conducted over the years and the conclusions reached were used to identify additional areas of research on materials for improved performance of components, especially metallic interconnects, in the complex fuel cell environments. This report details research conducted in the following areas: measurement of area specific electrical resistivity, corrosion performance in dual gas environments by experiments using alloy 446, long term corrosion performance of ferritic and austenitic alloys in hydrogen and methane-reformed synthesis fuel-gas environments, approaches to reduce the area resistance of metallic interconnect, and reduction of electrical resistivity of alumina scales on metallic interconnect. Based on the key requirements for metallic interconnects and the data developed on the corrosion behavior of candidate materials in meeting those requirements, several areas are recommended for further research to develop metallic interconnects with acceptable and reliable long-term performance in solid oxide fuel cells.

Natesan, K.; Zeng, Z.; Nuclear Engineering Division

2009-04-24T23:59:59.000Z

291

Monte Carlo analysis of a monolithic interconnected module with a back surface reflector  

SciTech Connect (OSTI)

Recently, the photon Monte Carlo code, RACER-X, was modified to include wave-length dependent absorption coefficients and indices of refraction. This work was done in an effort to increase the code`s capabilities to be more applicable to a wider range of problems. These new features make RACER-X useful for analyzing devices like monolithic interconnected modules (MIMs) which have etched surface features and incorporates a back surface reflector (BSR) for spectral control. A series of calculations were performed on various MIM structures to determine the impact that surface features and component reflectivities have on spectral utilization. The traditional concern of cavity photonics is replaced with intra-cell photonics in the MIM design. Like the cavity photonic problems previously discussed, small changes in optical properties and/or geometry can lead to large changes in spectral utilization. The calculations show that seemingly innocuous surface features (e.g., trenches and grid lines) can significantly reduce the spectral utilization due to the non-normal incident photon flux. Photons that enter the device through a trench edge are refracted onto a trajectory where they will not escape. This leads to a reduction in the number of reflected below bandgap photons that return to the radiator and reduce the spectral utilization. In addition, trenches expose a lateral conduction layer in this particular series of calculations which increase the absorption of above bandgap photons in inactive material.

Ballinger, C.T.; Charache, G.W. [Lockheed Martin Corp., Schenectady, NY (United States); Murray, C.S. [Bettis Atomic Power Lab., West Mifflin, PA (United States)

1998-10-01T23:59:59.000Z

292

Nuclear-renewable hybrid energy systems: Opportunities, interconnections, and needs  

SciTech Connect (OSTI)

As the U.S. energy system evolves, the amount of electricity from variable-generation sources is likely to increase, which could result in additional times when electricity demand is lower than available production. Thus, purveyors of technologies that traditionally have provided base-load electricitysuch as nuclear power plantscan explore new operating procedures to deal with the associated market signals. Concurrently, innovations in nuclear reactor design coupled with sophisticated control systems now allow for more complex apportionment of heat within an integrated system such as one linked to energy-intensive chemical processes. This paper explores one opportunity nuclear-renewable hybrid energy systems. These are defined as integrated facilities comprised of nuclear reactors, renewable energy generation, and industrial processes that can simultaneously address the need for grid flexibility, greenhouse gas emission reductions, and optimal use of investment capital. Six aspects of interaction (interconnections) between elements of nuclear-renewable hybrid energy systems are identified: Thermal, electrical, chemical, hydrogen, mechanical, and information. Additionally, system-level aspects affect selection, design, and operation of this hybrid system type. Throughout the paper, gaps and research needs are identified to promote further exploration of the topic.

Mark F. Ruth; Owen R. Zinaman; Mark Antkowiak; Richard D. Boardman; Robert S. Cherry; Morgan D. Bazilian

2014-02-01T23:59:59.000Z

293

Pulsed laser planarization of metal films for multilevel interconnects  

SciTech Connect (OSTI)

Multilevel interconnect schemes for integrated circuits generally require one or more planarization steps, in order to maintain an acceptably flat topography for lithography and thin-film step coverage on the higher levels. Traditional approaches have involved planarization of the interlevel insulation (dielectric) layers, either by spin-on application (e.g., polyimide), or by reflow (e.g., phosphosilicate glass). We have pursued an alternative approach, in which each metal level is melted (hence planarized) using a pulsed laser prior to patterning. Short (approx.1 ..mu..s) pulses are used to preclude undesirable metallurgical reactions between the film, adhesion or barrier layer, and dielectric layer. Laser planarization of metals is particularly well suited to multilevel systems which include ground or power planes. Results are presented for planarization of gold films on SiO/sub 2/ dielectric layers using a flashlamp-pumped dye laser. The pulse duration is approx.1 ..mu..s, which allows the heat pulse to uniformly penetrate the gold while not penetrating substantially through the underlying SiO/sub 2/ (hence not perturbing the lower levels of metal). Excellent planarization of the gold films is achieved (less than 0.1 ..mu..m surface roughness, even starting with extreme topographic variations), as well as improved conductivity. To demonstrate the process, numerous planarized two-layer structures (transmission lines under a ground plane) were fabricated and characterized. 9 refs., 2 figs.

Tuckerman, D.B.; Schmitt, R.L.

1985-05-01T23:59:59.000Z

294

Cost Study Manual  

Broader source: Energy.gov (indexed) [DOE]

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

295

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

296

Levelized Electricity Costs  

Science Journals Connector (OSTI)

The concept of levelized energy costs responds to the necessity of disclosing the ... in order to recover the total life cycle cost of energy production. This chapter charts the effectiveness of levelized cost fo...

Nuno Luis Madureira

2014-01-01T23:59:59.000Z

297

Methods | Transparent Cost Database  

Open Energy Info (EERE)

information NREL has developed the following cost of energy tools: System Advisor Model (SAM): https:sam.nrel.gov SAM makes performance predictions and cost of...

298

Response from PJM Interconnection LLC and Pepco to Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Docket No. EO-05-01: This letter will respond to your request for information concerning the potential need for Potomac River Station generation under the three reliability "scenarios" outlined by PJM and PEPCO. Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation More Documents & Publications Information Concerning Reliability Impacts under Various System

299

Reliable low latency I/O in torus-based interconnection networks  

E-Print Network [OSTI]

In today's high performance computing environment I/O remains the main bottleneck in achieving the optimal performance expected of the ever improving processor and memory technologies. Interconnection networks therefore combines processing units...

Azeez, Babatunde

2007-04-25T23:59:59.000Z

300

An energy vision: the transformation towards sustainability --interconnected challenges and solutions  

E-Print Network [OSTI]

consumption levels, lack of energy access, environmental concerns like climate change and air pollution (RCPs) [2 ], the International Energy Agency's World Energy Outlook [3,4 ], and several modeAn energy vision: the transformation towards sustainability -- interconnected challenges

Silver, Whendee

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Design of Computer Generated Binary Holograms for Free Space Optical Interconnections  

Science Journals Connector (OSTI)

The purpose of this Chapter is to give an introduction to the use of computer generated holograms (CGHs) as free space optical interconnection elements. We will focus mainly on the techniques for designing bin...

I. Montrosset; D. Cojoc; F. Sartori

1997-01-01T23:59:59.000Z

302

A polarizer chip based on CMOS Cu-interconnect for optical telecommunications  

Science Journals Connector (OSTI)

The construction by CMOS Cu-interconnect fabrication technology of an optical chip that performs the function of linear polarization is described. The chip consists of three rows of...

Ko, Cheng-Hao; Lee, Kuei-Jen

2006-01-01T23:59:59.000Z

303

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, Wyoming  

Broader source: Energy.gov [DOE]

After the applicant withdrew its request to interconnect the proposed Hermosa West Wind Farm Project with Western Area Power Administrations transmission system, Western cancelled preparation of an EIS to evaluate the potential environmental impacts of the proposal.

304

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

305

Fast Algorithms for High Frequency Interconnect Modeling in VLSI Circuits and Packages  

E-Print Network [OSTI]

used in MEMS, RFID and MRAM. We present the first BEM algorithm to extract interconnect inductance with magnetic materials. The algorithm models magnetic characteristics by the Landau Lifshitz Gilbert equation and fictitious magnetic charges...

Yi, Yang

2011-02-22T23:59:59.000Z

306

Modeling and Analysis of Large-Scale On-Chip Interconnects  

E-Print Network [OSTI]

in computer aided design areas. This dissertation presents new methodologies for addressing the above two important challenging issues for large scale on-chip interconnect modeling and analysis: In the past, the standard statistical circuit modeling techniques...

Feng, Zhuo

2010-07-14T23:59:59.000Z

307

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov [DOE]

Presentation covers the topic of "Renewable Generation and Interconnection to the Electrical Grid in Southern California," given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

308

Determination of Interfacial Adhesion Strength between Oxide Scale and Substrate for Metallic SOFC Interconnects  

SciTech Connect (OSTI)

The interfacial adhesion strength between the oxide scale and the substrate is crucial to the reliability and durability of metallic interconnects in SOFC operating environments. It is necessary, therefore, to establish a methodology to quantify the interfacial adhesion strength between the oxide scale and the metallic interconnect substrate, and furthermore to design and optimize the interconnect material as well as the coating materials to meet the design life of an SOFC system. In this paper, we present an integrated experimental/analytical methodology for quantifying the interfacial adhesion strength between oxide scale and a ferritic stainless steel interconnect. Stair-stepping indentation tests are used in conjunction with subsequent finite element analyses to predict the interfacial strength between the oxide scale and Crofer 22 APU substrate.

Sun, Xin; Liu, Wenning N.; Stephens, Elizabeth V.; Khaleel, Mohammad A.

2008-01-21T23:59:59.000Z

309

Solid oxide fuel cell with single material for electrodes and interconnect  

DOE Patents [OSTI]

A solid oxide fuel cell having a plurality of individual cells. A solid oxide fuel cell has an anode and a cathode with electrolyte disposed therebetween, and the anode, cathode and interconnect elements are comprised of substantially one material.

McPheeters, Charles C. (Naperville, IL); Nelson, Paul A. (Wheaton, IL); Dees, Dennis W. (Downers Grove, IL)

1994-01-01T23:59:59.000Z

310

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos  

E-Print Network [OSTI]

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos Semiconductor ABSTRACT We present the design of an intelligent optoelectronic chip carrier (IOCC the sapphire. The result is an optoelectronic package that supports full CMOS performance, is mechanically

Bakos, Jason D.

311

High-performance parallel processors based on star-coupled wavelength division multiplexing optical interconnects  

DOE Patents [OSTI]

As the performance of individual elements within parallel processing systems increases, increased communication capability between distributed processor and memory elements is required. There is great interest in using fiber optics to improve interconnect communication beyond that attainable using electronic technology. Several groups have considered WDM, star-coupled optical interconnects. The invention uses a fiber optic transceiver to provide low latency, high bandwidth channels for such interconnects using a robust multimode fiber technology. Instruction-level simulation is used to quantify the bandwidth, latency, and concurrency required for such interconnects to scale to 256 nodes, each operating at 1 GFLOPS performance. Performance scales have been shown to .apprxeq.100 GFLOPS for scientific application kernels using a small number of wavelengths (8 to 32), only one wavelength received per node, and achievable optoelectronic bandwidth and latency.

Deri, Robert J. (Pleasanton, CA); DeGroot, Anthony J. (Castro Valley, CA); Haigh, Ronald E. (Arvada, CO)

2002-01-01T23:59:59.000Z

312

File:08-CA-b - CAISO Interconnection Request Process.pdf | Open...  

Open Energy Info (EERE)

Process.pdf Jump to: navigation, search File File history File usage Metadata File:08-CA-b - CAISO Interconnection Request Process.pdf Size of this preview: 463 599 pixels....

313

Design of a decentralized detection filter for a class of interconnected LTI systems  

E-Print Network [OSTI]

In this thesis, we consider the problem of designing a decentralized detection filter for a class of homogeneous interconnected systems. In this class of systems, all subsystems have an identical structure. A fault in a subsystem propagates via...

Shankar, Shamanth

2001-01-01T23:59:59.000Z

314

Simulation of Bio-syngas Production from Biomass Gasification via Pressurized Interconnected Fluidized Beds  

Science Journals Connector (OSTI)

Bio-syngas production from biomass gasification via pressurized interconnected fluidized...T g), gasification pressure (p g) and steam to biomass ratio (S/B) on bio-syngas production

Fei Feng; Guohui Song; Laihong Shen

2014-01-01T23:59:59.000Z

315

OE Releases "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012"  

Broader source: Energy.gov [DOE]

The "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012" document, which is now available for downloading, is a compilation of publicly-available data on transmission constraints and congestion for the period 2009 through 2012.

316

E-Print Network 3.0 - at-speed interconnect bist Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Explorit Topic List Advanced Search Sample search results for: at-speed interconnect bist Page: << < 1 2 3 4 5 > >> 1 JOURNAL OF ELECTRONIC TESTING: Theory and Applications 19,...

317

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: Energy.gov (indexed) [DOE]

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

318

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

319

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

320

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A chronicle of costs  

SciTech Connect (OSTI)

This report contains the history of all estimated costs associated with the superconducting super collider.

Elioff, T.

1994-04-01T23:59:59.000Z

322

Early Station Costs Questionnaire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

323

A Holistic Approach to Designing Energy-Efficient Cluster Interconnects  

E-Print Network [OSTI]

and switch buffers consume the major portion of the power budget. Hence, we focus on energy optimization performance-energy behavior (up to 40 percent energy savings with less than 5 percent performance degradation as a major concern since server power usage is becoming a significant fraction of the total ownership cost [1

Kim, Eun Jung "EJ"

324

Low Cost, Durable Seal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost, Durable Seal Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability Transportation: 5,000 hr Stationary: 40,000 hr Durability Improve mechanical and chemical stability to achieve 40,000 hr of useful operating life. Low Cost Low Cost A material cost equivalent to or less than the cost of silicones in common use. 3 LOW COST, DURABLE SEAL

325

Estimation and Analysis of Life Cycle Costs of Baseline Enhanced...  

Open Energy Info (EERE)

this project will facilitate the following: - A clear understanding of the current cost structure - Its dependence on markets - The benefits of innovation - The impact of...

326

Energy Department Announces $7 Million to Reduce Non-Hardware Costs of  

Broader source: Energy.gov (indexed) [DOE]

7 Million to Reduce Non-Hardware Costs 7 Million to Reduce Non-Hardware Costs of Solar Energy Systems Energy Department Announces $7 Million to Reduce Non-Hardware Costs of Solar Energy Systems November 15, 2011 - 4:52pm Addthis Washington, D.C. - As part of the U.S. Department of Energy's SunShot Initiative, Energy Secretary Steven Chu today announced up to $7 million to reduce the non-hardware costs of residential and commercial solar energy installations. Made available through the SunShot Incubator Program, this funding will support the development of tools and approaches that reduce non-hardware, or "soft" costs, such as installation, permitting, interconnection, and inspection. These expenses can amount to up to half of the cost of residential systems. The Incubator will make the process of

327

Cost Minimization in an Energy-Intensive Plant Using Mathematical Programming Approaches  

Science Journals Connector (OSTI)

Cost Minimization in an Energy-Intensive Plant Using Mathematical Programming Approaches ... This creates a potential opportunity to reduce average operating costs by changing the operating mode and production rates depending on the power costs. ...

M. G. Ierapetritou; D. Wu; J. Vin; P. Sweeney; M. Chigirinskiy

2002-09-24T23:59:59.000Z

328

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

N /A

2004-10-21T23:59:59.000Z

329

Operations Cost Allocation Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

330

Characterizing opportunities for short reach optical interconnect adoption : a market survey and total cost of ownership model approach  

E-Print Network [OSTI]

Over the past decade, the demand for digital information has increased dramatically with the rising use of the Internet and various types of multimedia data - text, audio, graphics, video, and voice. As a consequence, the ...

Lindsey, Johnathan Jake, III

2010-01-01T23:59:59.000Z

331

Hydrogen Threshold Cost Calculation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Record (Offices of Fuel Cell Technologies) Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing vehicles [gasoline in hybrid-electric vehicles (HEVs)] in 2020. This record documents the methodology and assumptions used to calculate that threshold cost. Principles: The cost threshold analysis is a "top-down" analysis of the cost at which hydrogen would be

332

Hydrogen Pathway Cost Distributions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pathway Cost Distributions Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric hybrids are benchmarks * R&D guidance provided in two forms * Evolved gasoline ICE defines a threshold hydrogen cost used to screen or eliminate options which can't show ability to meet target * Gasoline-electric hybrid defines a lower hydrogen cost used to prioritize projects for resource allocation

333

Cost-Benefit Analysis  

Science Journals Connector (OSTI)

Acost-benefit analysis is an analytical procedure for determining the economic efficiency of intervention, expressed as the relationship between costs and outcomes, usually measured in monetary terms. In othe...

2008-01-01T23:59:59.000Z

334

Cost-Efficiency  

Science Journals Connector (OSTI)

Cost?efficiency is agoal that has been integrated by policy makers into all modern health care systems to control the expansion of costs over time. It relates to maximizing the quality of acomparable unit ...

2008-01-01T23:59:59.000Z

335

About Cost Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from the university, fee-for-service contracts, as well as establishing CAMD as a cost center. We know that our users are reluctant to see CAMD become a cost center, however...

336

Costs of Electricity  

Science Journals Connector (OSTI)

A major reason for the decreased interest in the building of new nuclear power plants in recent years has been the relatively high cost of nuclear power. In this section, we will consider the role of costs in electricity

2005-01-01T23:59:59.000Z

337

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

338

Cost Optimal Energy Performance  

Science Journals Connector (OSTI)

EPBD recast requires Member States (MS) to ensure that minimum energy performance requirements of buildings are set with a view to achieving cost optimal levels using a comparative methodology framework...1]. Cost

Jarek Kurnitski

2013-01-01T23:59:59.000Z

339

Plastic deformation in Al (Cu) interconnects stressed by electromigration and studied by synchrotron polychromatic X-ray microdiffraction  

E-Print Network [OSTI]

Plastic deformation in Al (Cu) interconnects stressed bygrain orientation [7], study plastic deformation [12-15] andThis aspect of EM-induced plastic deformation in grains

Chen, Kai; Advanced Light Source; UCLA

2008-01-01T23:59:59.000Z

340

Cost Containment and Productivity  

E-Print Network [OSTI]

Cost Containment and Productivity Faculty Assembly Presentation January 22, 2013 Arthur G. Ramicone, CFO David N. DeJong, Vice Provost, Academic Planning and Resources Management #12;Cost Containment Resources to Enhance the Student Experience · Reduce the Cost and Complexity of Administrative Operations

Jiang, Huiqiang

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

342

Lunch & Learn Cost Sharing  

E-Print Network [OSTI]

Lunch & Learn Cost Sharing #12;Today's Agenda Policy Procedures OMNI Child Budget Setup Transactions in OMNI FACET Common Issues #12;Cost Sharing Policy http://www.research.fsu.edu/contractsgra nts ­ Not quantified ­ Do not have to account for and report #12;Cost Sharing Procedures http

McQuade, D. Tyler

343

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network [OSTI]

index (1,2, 24) fixed electricity costs, $ macrogrid CO 2the commercial building, $ electricity costs, $ distributedcosts, $ variable electricity costs (energy and demand

Stadler, Michael

2012-01-01T23:59:59.000Z

344

Power System Generation and Inter-Connection Planning Model (SUPER) | Open  

Open Energy Info (EERE)

Power System Generation and Inter-Connection Planning Model (SUPER) Power System Generation and Inter-Connection Planning Model (SUPER) Jump to: navigation, search Tool Summary Name: Power System Generation and Inter-Connection Planning Model (SUPER) Agency/Company /Organization: Latin American Energy Organization Sector: Energy Focus Area: Renewable Energy, Hydro Topics: Resource assessment Resource Type: Software/modeling tools Website: www.olade.org/superEn.html References: SUPER website [1] "This model is useful for multi-year electricity system planning studies, making it possible to analyze, optimize, simulate and develop hydrothermal power system expansion plans." References ↑ "SUPER website" Retrieved from "http://en.openei.org/w/index.php?title=Power_System_Generation_and_Inter-Connection_Planning_Model_(SUPER)&oldid=329

345

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

SciTech Connect (OSTI)

The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

2012-03-26T23:59:59.000Z

346

Cost Function Estimates  

Science Journals Connector (OSTI)

Abstract The cost function describes the cost-minimizing combinations of inputs required for production of different levels of output. Empirical cost function studies take both short-run and long-run approaches and can be structurally consistent with microeconomic theory versus more behavioral or real-world data oriented. Studies of health care providers face numerous challenges including the multiproduct nature of the firm, difficulty in controlling for quality of service, and frequent failure of the profit-maximization assumption. Cost function applications in health care are numerous and include such topics as optimal firm size, performance inefficiency measures, and comparisons of production costs with third-party payments.

K. Carey

2014-01-01T23:59:59.000Z

347

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

348

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

349

Method of bonding an interconnection layer on an electrode of an electrochemical cell  

DOE Patents [OSTI]

An electrochemical cell containing an air electrode, contacting electrolyte and electronically conductive interconnection layer, and a fuel electrode, has the interconnection layer attached by: (A) applying a thin, closely packed, discrete layer of LaCrO[sub 3] particles, doped with an element selected from the group consisting of Ca, Sr, Co, Ba, Mg and their mixtures on a portion of the air electrode, and then (B) electrochemical vapor depositing a dense skeletal structure between and around the doped LaCrO[sub 3] particles. 2 figs.

Pal, U.B.; Isenberg, A.O.; Folser, G.R.

1992-01-14T23:59:59.000Z

350

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov (indexed) [DOE]

SOUTHERN CALIFORNIA EDISON® SOUTHERN CALIFORNIA EDISON® SM 1 Federal Utility Partnership Working Group Providence, Rhode Island April 15, 2010 Renewable Generation and Interconnection to the Electrical Grid in Southern California Daniel Tunnicliff, P.E. Manager, Government & Institutions SOUTHERN CALIFORNIA EDISON® SM 2 Overview * SCE Overview * SCE Procurement Objectives * Renewable Procurement * Challenges to Meeting Renewable Goals in California * Interconnection Processes * Lessons Learned SOUTHERN CALIFORNIA EDISON® SM 3 SCE Overview * Large system  13 million residents  4.8 million customer accounts  50,000-square-mile service area * Nation's leader in environmental solutions  Energy efficiency  Renewable energy procurement  Electric transportation  Advanced meters  Smart grid

351

Cost Model for Digital Curation: Cost of Digital Migration  

E-Print Network [OSTI]

Steece, B. 2000. Software cost estimation with COCOMO II.Developing a Framework of Cost Elements for PreservingAshley, K. 1999. Digital archive costs: Facts and fallacies.

Kejser, Ulla Bgvad; Nielsen, Anders Bo; Thirifays, Alex

2009-01-01T23:59:59.000Z

352

Beyond Silicon: Cutting the Costs of Solar Power | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beyond Silicon: Cutting the Costs of Solar Power Beyond Silicon: Cutting the Costs of Solar Power Stories of Discovery & Innovation Beyond Silicon: Cutting the Costs of Solar Power Enlarge Photo Courtesy of University of Illinois Mechanically flexible, high efficiency solar module that uses an interconnected array of microscale GaAs photovoltaic cells, grown in a multilayer stack on a wafer and then printed onto a sheet of plastic. Enlarge Photo 04.15.11 Beyond Silicon: Cutting the Costs of Solar Power New method of fabricating semiconductors from gallium arsenide promises more affordable solar power, improved semiconductor devices. The biggest single barrier to widespread adoption of solar power continues to be the cost of solar cells. University of Illinois materials scientists supported by the DOE Office of Science have scored a

353

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network [OSTI]

costs, EV battery degradation costs, and sales. min C ?????electricity sales, $ Electricity exchange with EVs D EV m,h

Stadler, Michael

2012-01-01T23:59:59.000Z

354

Commercial equipment cost database  

SciTech Connect (OSTI)

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

355

Long-Distance Interconnection as Solar Resource Intermittency Solution: Optimizing the Use of Energy Storage and the Geographic  

E-Print Network [OSTI]

of Energy Storage and the Geographic Dispersion + Interconnection of Solar Generating Facilities. Marc J. R energy targets. Variability of the solar resource occurs across many different temporal scales: from energy storage and Long-distance interconnection coupled with geographic dispersion of solar generating

356

Three-Dimensional Analysis of Solid Oxide Fuel Cell Ni-YSZ Anode Interconnectivity James R. Wilson,a  

E-Print Network [OSTI]

1 Three-Dimensional Analysis of Solid Oxide Fuel Cell Ni-YSZ Anode Interconnectivity James R of interconnectivity of solid-oxide fuel cell (SOFC) electrode phases. The method was applied to the three, and hence was not electrochemically active. #12;2 1. Introduction Attempts to understand solid oxide fuel

Kalies, William D.

357

A Guidebook on Grid Interconnection and Islanded Operation of Mini-Grid Power Systems Up to 200 kW  

E-Print Network [OSTI]

Nehru National Solar Mission: Phase II Policy Document. Solar Friendly Communities Permitting, Interconnection, and Net Metering: An Overview of Model Standards and PolicySolar ABCs) funded by the USA Department of Energy, pushes for reform and national standardization on interconnection policy.

Greacen, Chris

2014-01-01T23:59:59.000Z

358

OIL: a nano-photonics optical interconnect library for a new photonic networks-on-chip architecture  

Science Journals Connector (OSTI)

In this paper, we present OIL, a parameterized Optical Interconnect Library of silicon nano-photonic devices for system level interconnect planning/analysis and low power high performance design exploration under a new holistic photonic Networks-on-Chip ... Keywords: computer aided design, high performance, low power, photonic networks-on-chip

Duo Ding; David Z. Pan

2009-07-01T23:59:59.000Z

359

Methods | Transparent Cost Database  

Open Energy Info (EERE)

Methods Methods Disclaimer The data gathered here are for informational purposes only. Inclusion of a report in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a single discount rate in order to compare technology costs only. About the Cost Database For emerging energy technologies, a variety of cost and performance numbers are cited in presentations and reports for present-day characteristics and potential improvements. Amid a variety of sources and methods for these data, the Office of Energy Efficiency and Renewable Energy's technology development programs determine estimates for use in program planning. The Transparent Cost Database collects program cost and performance

360

LMFBR fuel component costs  

SciTech Connect (OSTI)

A significant portion of the cost of fabricating LMFBR fuels is in the non-fuel components such as fuel pin cladding, fuel assembly ducts and end fittings. The contribution of these to fuel fabrication costs, based on FFTF experience and extrapolated to large LMFBR fuel loadings, is discussed. The extrapolation considers the expected effects of LMFBR development programs in progress on non-fuel component costs.

Epperson, E.M.; Borisch, R.R.; Rice, L.H.

1981-10-29T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

362

Petroleum well costs.  

E-Print Network [OSTI]

??This is the first academic study of well costs and drilling times for Australia??s petroleum producing basins, both onshore and offshore. I analyse a substantial (more)

Leamon, Gregory Robert

2006-01-01T23:59:59.000Z

363

Early Station Costs Questionnaire  

Broader source: Energy.gov (indexed) [DOE]

of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the...

364

''When Cost Measures Contradict''  

SciTech Connect (OSTI)

When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P. M.

2003-05-09T23:59:59.000Z

365

Low Cost, Durable Seal  

Broader source: Energy.gov [DOE]

This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects.

366

Compact quasi-analytic equations for estimating the temperature distribution of ULSI interconnections  

Science Journals Connector (OSTI)

With the wide application of low dielectric constant materials in ULSI circuits, the problem of heat dissipation becomes more critical due to the small thermal conductivity of such materials. Compact quasi-analytic equations for estimating the temperature ... Keywords: ULSI circuits, interconnection, thermal behavior simulation

X. Xiao; X. You; G. Ruan

2002-04-01T23:59:59.000Z

367

Modeling and Simulation Environment for Photonic Interconnection Networks in High Performance Computing  

E-Print Network [OSTI]

at the scale of high performance computer clusters and warehouse scale data centers, system level simulations and results for rack scale photonic interconnection networks for high performance computing. Keywords: optical to the newsworthy power consumption [3], latency [4] and bandwidth challenges [5] of high performance computing (HPC

Bergman, Keren

368

THE ANALYSYS OF INFORMATION IMPACTS IN COORDINATING DEFENCE AGAINST MALICIOUS ATTACKS FOR INTERCONNECTED  

E-Print Network [OSTI]

and the physical behaviors of power systems. Secondly, system operators are assumed able to perform certain-ordination of Transmission of Electricity) operation handbook [6]. Meanwhile, multi-agent systems (MAS) have been widely FOR INTERCONNECTED POWER SYSTEMS Ettore Bompard George Gross Roberto Napoli Fei Xue Politecnico di Torino University

Gross, George

369

Optimization of Interconnects Between Accelerators and Shared Memories in Dark Silicon Jason Cong and Bingjun Xiao  

E-Print Network [OSTI]

Optimization of Interconnects Between Accelerators and Shared Memories in Dark Silicon Jason Cong, 90095 {cong, xiao}@cs.ucla.edu Abstract--Application-specific accelerators provide orders-of- magnitude improvement in energy-efficiency over CPUs, and accelerator-rich computing platforms are showing promise

Cong, Jason "Jingsheng"

370

Optimization and Visualization of the North American Eastern Interconnect Power Market  

E-Print Network [OSTI]

. Hale DHALE@eia.doe.gov U.S. Energy Information Agency Washington, DC 20585 USA Thomas J. OverbyeOptimization and Visualization of the North American Eastern Interconnect Power Market Douglas R Overbye@ece.uiuc.edu University of Illinois at Urbana-Champaign Urbana, IL 61801 USA Abstract This paper

371

Graphene based nanomaterials for VLSI interconnect and energy-storage applications  

Science Journals Connector (OSTI)

As IC feature sizes continue to be scaled below 45 nanometer, copper wires exhibit significant "size effects" resulting in a sharp rise in their resistivity, which, in turn, has adverse impact both on their performance as well as reliability--in the ... Keywords: carbon nanomaterials, carbon nanotubes, graphene nano-ribbons, interconnects, passives.

Kaustav Banerjee

2009-07-01T23:59:59.000Z

372

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration is preparing an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near ONeill, Nebraska, to Westerns power transmission system. The project website is http://www.wapa.gov/ugp/Environment/GrandePrairie.htm.

373

Ionized physical vapor deposition of integrated circuit interconnects* J. Hopwood,a)  

E-Print Network [OSTI]

alloy silicide gate level and several metal-SiO2 interlayer dielectric ILD levels joined together metal layers. By the year 2007 it is predicted that logic circuits will use 6 to 7 interconnected metal physical vapor deposition I-PVD . The technique economically creates a unidirectional flux of metal which

374

Synthesis of electrical networks interconnecting PZT actuators to damp mechanical vibrations  

E-Print Network [OSTI]

This paper proves that it is possible to damp mechanical vibrations of some beam frames by means of piezoelectric actuators interconnected via passive networks. We create a kind of electromechanical wave guide where the electrical velocity group equals the mechanical one thus enabling an electromechanical energy transfer. Numerical simulations are presented which prove the technical feasibility of proposed device

F. dell'Isola; E. G. Henneke; M. Porfiri

2010-08-30T23:59:59.000Z

375

ELECTRIFICATION OF ISOLATED AREAS BY INTERCONNECTING DIFFERENT RENEWABLE SOURCES OF ENERGY: A SUSTANAIBLE APPROACH  

E-Print Network [OSTI]

of a methodology for rural electrification by micro-grids based upon different renewable resources. > ApplicationELECTRIFICATION OF ISOLATED AREAS BY INTERCONNECTING DIFFERENT RENEWABLE SOURCES OF ENERGY to absorb innovations such as rural electrification by isolated micro grid Sustainable approach The success

376

Transient Analysis of a CMOS Inverter Driving Resistive Interconnect Kevin T. Tang and Eby G. Friedman  

E-Print Network [OSTI]

are characterized by the th power law model. In order to emphasize the nonlinear behavior of a CMOS inverterTransient Analysis of a CMOS Inverter Driving Resistive Interconnect Kevin T. Tang and Eby G. Friedman Department of Electrical and Computer Engineering University of Rochester Rochester, New York

Friedman, Eby G.

377

A Self-Reconfigurable Lightweight Interconnect for Scalable Processor Fabrics Heiner Giefers and Marco Platzner  

E-Print Network [OSTI]

, energy, and execution time. Therefore it is of high interest to also study alternative interconnects compile-time informa- tion and reconfigures the global network due to program demands. We consider data of the switch's ports. Communication within a sub-bus is established by broadcasting to the bus segment

Hellebrand, Sybille

378

HVDC Control Strategies to Improve Transient Stability in Interconnected Power Systems  

E-Print Network [OSTI]

HVDC Control Strategies to Improve Transient Stability in Interconnected Power Systems J. Hazra Dpt of Li`ege, Belgium, dernst@ulg.ac.be Abstract--This paper presents three HVDC modulation strate- gies flow settings through the HVDC-links. The proposed techniques are tested on the IEEE 24-Bus reliability

Boyer, Edmond

379

Aquifer thermal energy storage costs with a seasonal heat source.  

SciTech Connect (OSTI)

The cost of energy supplied by an aquifer thermal energy storage (ATES) system from a seasonal heat source was investigated. This investigation considers only the storage of energy from a seasonal heat source. Cost estimates are based upon the assumption that all of the energy is stored in the aquifer before delivery to the end user. Costs were estimated for point demand, residential development, and multidistrict city ATES systems using the computer code AQUASTOR which was developed specifically for the economic analysis of ATES systems. In this analysis the cost effect of varying a wide range of technical and economic parameters was examined. Those parameters exhibiting a substantial influence on ATES costs were: cost of purchased thermal energy; cost of capital; source temperature; system size; transmission distance; and aquifer efficiency. ATES-delivered energy costs are compared with the costs of hot water heated by using electric power or fuel-oils. ATES costs are shown as a function of purchased thermal energy. Both the potentially low delivered energy costs available from an ATES system and its strong cost dependence on the cost of purchased thermal energy are shown. Cost components for point demand and multi-district city ATES systems are shown. Capital and thermal energy costs dominate. Capital costs, as a percentage of total costs, increase for the multi-district city due to the addition of a large distribution system. The proportion of total cost attributable to thermal energy would change dramatically if the cost of purchased thermal energy were varied. It is concluded that ATES-delivered energy can be cost competitive with conventional energy sources under a number of economic and technical conditions. This investigation reports the cost of ATES under a wide range of assumptions concerning parameters important to ATES economics. (LCL)

Reilly, R.W.; Brown, D.R.; Huber, H.D.

1981-12-01T23:59:59.000Z

380

Cost Estimating and Cost Management Capacity Building Workshop  

E-Print Network [OSTI]

Cost Estimating and Cost Management Capacity Building Workshop August 11-13, 2010 Coffman Memorial 574 guidebook on cost estimating and cost management · To learn how states are moving forward with the implementation of the guidebook or other initiatives related to cost estimating and cost management · To share

Minnesota, University of

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Simple Modular LED Cost Model  

Broader source: Energy.gov [DOE]

The LED Cost Model, developed by the DOE Cost Modeling Working Group, provides a simplified method for analyzing the manufacturing costs of an LED package. The model focuses on the major cost...

382

COST AND PRICE ANALYSIS--AN EXPLANATION Some form of price or cost analysis should be performed in connection with every procurement action,  

E-Print Network [OSTI]

06/06 COST AND PRICE ANALYSIS--AN EXPLANATION Some form of price or cost analysis should, and the pricing situation. Determination of price reasonableness through price or cost analysis is required even the conclusions arrived at through cost analysis. The form and degree of analysis are dependent on facts

Weston, Ken

383

Costing climate change  

Science Journals Connector (OSTI)

...Costenergy analyses of such schemes...and tidal power at costs...consider in economic analyses of GHG abatement...pertaining to wind power in Denmark...In a cost analysis of implementing...Cutting coal combustion...large an economic burden...

2002-01-01T23:59:59.000Z

385

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

existing avoided cost methodology and established thefor certain avoided cost methodologies or avoided cost inpu

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

386

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

387

Lookin g for data personnel costs, indirect costs, equipment costs  

Broader source: Energy.gov (indexed) [DOE]

Negotiating Group Question/Answer Sessions November 19, 2009 Q: What happens now? A: The negotiation process starts tomorrow [November 20, 2009], when DOE will be sending the Awardees an e-mail with information about which website to go to for clarification and direction, information from the Office of Civil Rights, and answers to some of the questions that came up in the meeting. DOE will be gathering information about the questions concerning cyber requirements, metrics, and reporting requirements and will be getting back to the awardees about those issues the week after Thanksgiving. We have done a review of the budgets, and emails will be sent giving opportunities to address any issues. We will also re-review technical and cost proposals.

388

Study of Possible Applications of Currently Available Building Information Modeling Tools for the Analysis of Initial Costs and Energy Costs for Performing Life Cycle Cost Analysis  

E-Print Network [OSTI]

power to the manufacturing industry. The need to satisfy the environmental sustainability requirements, improve operational effectiveness of buildings and apply value engineering principles has increased the dependency on life cycle costing analysis...

Mukherji, Payal Tapandev

2011-02-22T23:59:59.000Z

389

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Broader source: Energy.gov (indexed) [DOE]

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

390

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

391

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

392

Cost Effective Sustainable Housing.  

E-Print Network [OSTI]

??Cost Effective Sustainable Housing The topic of research which was discussed throughout this study was an analysis of sustainable development between single-family and multi-family structures. (more)

Morton, Joshua

2009-01-01T23:59:59.000Z

393

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

394

Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and Renewable Energy Get Widget Code...

395

Costing climate change  

Science Journals Connector (OSTI)

...even whether man-made greenhouse-gas emissions should...and monetary savings from lighting policy calculated using `Work Energy Smart Lighting Calculator', assuming...reducing energy costs and greenhouse gases. Australian Greenhouse...

2002-01-01T23:59:59.000Z

396

Estimating environmental costs  

Science Journals Connector (OSTI)

Added demands on natural resources and proposed environmental regulations could potentially have a significant impact on the production and operational costs of information technology (IT). In this paper, we utilize an Economic Input-Output Life-Cycle ...

Kiara Corrigan; Amip Shah; Chandrakant Patel

2010-02-01T23:59:59.000Z

397

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... Administration and the government of East Pakistan. CONTENTS Chapter Page I. Introduction and Prelisd. nary Discussion II. Installation and Accounting Aspects of Standard Costs for Labor III, Recording~ Analysing and Reporting of Labor Vaxlances . 45 IV...

Khan, Mohammed Nurul Absar

2012-06-07T23:59:59.000Z

398

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

399

The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Relevance of Generation The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland Subcontract Report NREL/SR-6A20-48987 October 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland

400

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Making Connections: Case Studies of Interconnection Barriers and their Impact on Distributed Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Interconnection of Interconnection Barriers and their Impact on Distributed Power Projects M a k i n g M a k i n g Connections Connections NREL/SR-200-28053 Revised July 2000 United States Department Of Energy Distributed Power Program Office of Energy Efficiency and Renewable Energy, Office of Power Technologies Joseph Galdo DOE Distributed Power Program Manager Office of Power Technologies, EE-15 U.S. Department of Energy Forrestal Building, 5H-021 1000 Independence Avenue SW Washington, DC 20585 Phone: (202) 586-0518 Fax: (202) 586-1640 Richard DeBlasio NREL Distributed Power Program Manager National Renewable Energy Laboratory 1617 Cole Blvd. (MS 3214) Golden, CO 80601 Phone: (303) 384-6452 Fax: (303) 384-6490 Gary Nakarado* National Renewable Energy Laboratory NREL Distributed Power Program Technical Monitor

402

A novel design for monolithic interconnected modules (MIMs) for thermophotovoltaic (TPV) power conversion  

SciTech Connect (OSTI)

The design for the fabrication of Monolithic Interconnected Modules (MIMs) for thermophotovoltaic (TPV) power conversion described in this paper utilizes a novel, interdigitated contacting scheme that increases the flexibility in the size of the component cells and hence the output current and voltage of the module. This flexibility is gained at the expense of only minimally increased grid obscuration. Because the design uses the grid fingers of the component cells as the interconnect structure, the area of the device used for this purpose becomes negligible. In this paper the authors report on the specifics of the design as well as issues related to the fabrication of the modules. Preliminary performance data for representative modules also are offered.

Ward, J.S.; Duda, A.; Wanlass, M.W. [National Renewable Energy Lab., Golden, CO (United States)] [and others

1997-06-01T23:59:59.000Z

403

Bipolar plating of metal contacts onto oxide interconnection for solid oxide electrochemical cell  

DOE Patents [OSTI]

Disclosed is a method of forming an adherent metal deposit on a conducting layer of a tube sealed at one end. The tube is immersed with the sealed end down into an aqueous solution containing ions of the metal to be deposited. An ionically conducting aqueous fluid is placed inside the tube and a direct current is passed from a cathode inside the tube to an anode outside the tube. Also disclosed is a multi-layered solid oxide fuel cell tube which consists of an inner porous ceramic support tube, a porous air electrode covering the support tube, a non-porous electrolyte covering a portion of the air electrode, a non-porous conducting interconnection covering the remaining portion of the electrode, and a metal deposit on the interconnection.

Isenberg, Arnold O. (Forest Hills Boro, PA)

1987-01-01T23:59:59.000Z

404

Tokamak reactor cost model based on STARFIRE/WILDCAT costing  

SciTech Connect (OSTI)

A cost model is presented which is useful for survey and comparative studies of tokamak reactors. The model is heavily based on STARFIRE and WILDCAT costing guidelines, philosophies, and procedures and reproduces the costing for these devices quite accurately.

Evans, K. Jr.

1983-03-01T23:59:59.000Z

405

Optimal control locations for a class of large interconnected dynamic systems  

E-Print Network [OSTI]

system, a stability crisis usually arises when a fault occurs at one or more major transmission lines. After such a fault, the system suddenly possesses an excess of unevenly distributed kinetic energy. If no action is taken, this energy excess could... cause the phase angles of the generators to swing wildly and thus overload and eventually trip breakers on some interconnecting transmission lines. An open breaker essentially deletes a line from the system, which in turn triggers the possible...

Antonio, John Kirby

2012-06-07T23:59:59.000Z

406

Performance optimization of interconnections for ultra-high-speed digital circuits  

E-Print Network [OSTI]

as distributed transmission line systems. Criteria for the design are outlined and studied. The findings of these studies are then applied to requirements for optimal design of interconnection schemes at various levels of high-speed digital system packaging... . V 40 A. Conductor Bends . . . . . . . . . . . . . . . . 42 B. Impedance Step/Mismatched Transmission Line Element 46 C. Fan-out/Fan-in Signal Distribution Networks D. Conclusions for Discontinuity Behaviors 55 71 V COUPLED LINE BEHAVIORS...

Carey, David Harrison

2012-06-07T23:59:59.000Z

407

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection  

SciTech Connect (OSTI)

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

2013-03-01T23:59:59.000Z

408

Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.  

SciTech Connect (OSTI)

Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

2012-02-01T23:59:59.000Z

409

Life Prediction of Coated and Uncoated Metallic Interconnect for Solid Oxide Fuel Cell Applications  

SciTech Connect (OSTI)

Oxidation reaction of the ferritic stainless interconnects in a typical SOFC working environment is unavoidable and the thickness of the oxide scale will continue to grow with operating time, even with protective coatings. The interfacial strength of the various interfaces for the uncoated and coated ferritic interconnects is crucial to long term performance of SOFCs. In this paper, we employ an integrated experimental/modeling approach to quantify the interfacial strength and to further predict the life of Crofer 22 APU as SOFC interconnect under isothermal cooling condition. The life of Crofer 22 APU was predicted by comparing the predicted interfacial strength, interfacial stresses induced by the cooling process from the operating temperature to room temperature, together with the growth kinetics of oxide scale with and without spinel coating. It was found that the interfacial strength between the oxide scale and Crofer 22 APU substrate decreases with the growth of the oxide scale. The interfacial strength of the oxide scale and spinel coating is much higher than that of the oxide scale and Crofer 22 APU substrate. With the spinel coating, the predicted life of the Crofer 22 APU is significantly longer than that of the uncoated Crofer 22 APU.

Liu, Wenning N.; Sun, Xin; Stephens, Elizabeth V.; Khaleel, Mohammad A.

2009-04-15T23:59:59.000Z

410

Evaluation of a Surface Treatment on the Performance of Stainless Steels for SOFC Interconnect Applications  

SciTech Connect (OSTI)

Pack cementation-like Cerium based surface treatments have been found to be effective in enhancing the oxidation resistance of ferritic steels (Crofer 22APU) for solid oxide fuel cell (SOFC) applications. The application of either a CeN- or CeO2 based surface treatment results in a decrease in weight gain by a factor of three after 4000 hours exposure to air+3%H2O at 800oC. Similar oxide scales formed on treated and untreated surfaces, with a continuous Cr-Mn outer oxide layer and a continuous inner Cr2O3 layer formed on the surface. However, the thickness of the scales, and the amount of internal oxidation were significantly reduced with the treatment, leading to the decrease in oxidation rate. This presentation will detail the influence of the treatment on the electrical properties of the interconnect. Half-cell experiments (LSM cathode sandwiched between two steel interconnects) and full SOFC button cell experiments were run with treated and untreated interconnects. Preliminary results indicate the Ce treatment can improve SOFC performance.

Alman, D.E.; Holcomb, Adler, T.A.; G.R.; Wilson, R.D.; Jablonski, P.D.

2007-04-01T23:59:59.000Z

411

Feasibility studies of a power interconnection system for Central American countries: SIEPAC project  

SciTech Connect (OSTI)

The electrical systems of the Central American countries are linked by 230 kV ac weak border interconnections forming two separated subsystems. The first one includes Guatemala and El Salvador, and the other one comprises the systems of Honduras, Nicaragua, Costa Rica, and Panama. As a consequence, unrestricted energy exchanges among all countries are not possible. This article describes the SIEPAC project which consists of a 1,678 km long 500 kV ac power transmission line that would link the six electrical systems of the region through seven power substations (one for each country and two in Panama), installed close to the highest demand national centers and six control centers of energy (one for each country) to allow coordinated operation of the interconnection.This project also considers a set of complementary assets (230 ac power transmission lines into some countries and the border transmission line between El Salvador and Honduras, and various other equipment). The power transmission line will greatly reinforce the actual border interconnections, which have a reduced capacity of exchange and technical problems associated with the stability of a weak longitudinal system. On the other hand, economic savings for the region would be achieved, coming from a higher coordination level in the operation and planning of their systems.

Gomez, T.; Enamorado, J.C. (Univ. Pontificia Comillas, Madrid (Spain). Inst. de Investigacion Tecnologica); Vela, A. (Empresa Nacional de Electricidad, Madrid (Spain))

1994-06-01T23:59:59.000Z

412

File:PUCT DG Interconnection Manual.pdf | Open Energy Information  

Open Energy Info (EERE)

PUCT DG Interconnection Manual.pdf PUCT DG Interconnection Manual.pdf Jump to: navigation, search File File history File usage Metadata File:PUCT DG Interconnection Manual.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 2.02 MB, MIME type: application/pdf, 114 pages) File history Click on a date/time to view the file as it appeared at that time.

413

High-speed graphene interconnects monolithically integrated with CMOS ring oscillators operating at 1.3GHz  

E-Print Network [OSTI]

We have successfully experimentally integrated graphene interconnects with commercial 0.25 ¿m technology CMOS ring oscillator circuit using conventional fabrication techniques, and demonstrated high speed on-chip graphene ...

Chen, Xiangyu

414

Low-Cost "Vacuum Desiccator"  

Science Journals Connector (OSTI)

Low-Cost "Vacuum Desiccator" ... Described are individualized, low-cost, and safe desiccators that can be efficiently and rapidly made with an inexpensive kitchen aid sold for shrink-wrapping food. ... Cost-Effective Teacher ...

Frederick Sweet

2004-10-01T23:59:59.000Z

415

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

416

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

417

Sunk Costs and Competitive Bidding  

E-Print Network [OSTI]

SUNK COSTS AND COMPETITIVE BIDDING Kenneth R. FrenchRevised: November 1982 SUNK COSTS AND COMPETITIVE BIDDINGl the winning bid be? I f sunk costs do not matter, I f the

French, Kenneth R.; McCormick, Robert E.

1982-01-01T23:59:59.000Z

418

Assigning research and development costs  

E-Print Network [OSTI]

and Development Cost Components RESEARCH AND DEVELOPMENT COSTS IN FINANCIAL STATEMENTS . 10 Capitalization Basis for Reporting Research and Development Costs Revenue Basis for Reporting Research and Development Costs Reasons Why Most Companies Expense... PRACTICE WITH ACCOUNTING THEORY Unknown Results at the End of an Accounting Period Uncertain Useful Life of Results. . . . . . . . . . . . . Recurrence of Annual Costs Permissive Feature of the Internal Revenue Code Uniform Amounts of Annual Costs...

Edwards, Wendell Edward

2012-06-07T23:59:59.000Z

419

Development of Ni1-xCoxO as the cathode/interconnect contact for solid oxide fuel cells  

SciTech Connect (OSTI)

A new type of material, Ni1-xCoxO, was developed for solid oxide fuel cell (SOFC) cathode/interconnect contact applications. The phase structure, coefficient of thermal expansion, sintering behavior, electrical property, and mechanical bonding strength of these materials were evaluated against the requirements of the SOFC cathode/interconnect contact. A dense cathode/interconnect contact layer was developed through reaction sintering from Ni and Co metal powders. An area specific resistance (ASR) as low as 5.5 mohm.cm2 was observed after 1000 h exposure in air at 800 C for the LSM/Ni0.33Co0.67O/AISI441 assembly. Average mechanical strengths of 6.8 and 5.0 MPa were obtained for the cathode/contact/cathode and interconnect/contact/interconnect structures, respectively. The significantly low ASR was probably due to the dense structure and therefore improved electrical conductivity of the Ni0.33Co0.67O contact and the good bonding of the interfaces between the contact and the cathode, and between the contact and the interconnect.

Lu, Zigui; Xia, Guanguang; Templeton, Joshua D.; Li, Xiaohong S.; Nie, Zimin; Yang, Zhenguo; Stevenson, Jeffry W.

2011-06-01T23:59:59.000Z

420

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

422

Power Plant Cycling Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Plant Cycling Costs Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Prepared under Subcontract No. NFT-1-11325-01

423

Cost Controls Pay Off Big  

Science Journals Connector (OSTI)

Cost Controls Pay Off Big ... Biggest plus was the general improvement in the economy; but to this must be added successful efforts by industry to control costs. ...

1959-02-16T23:59:59.000Z

424

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

425

Investing (in) equity : how can urban development internalize social cost?  

E-Print Network [OSTI]

This thesis recognizes the social costs created by privately driven urban development while also acknowledging cities' fiscal dependence on local property taxes. This study is based on the premise that equitable spatial ...

Xypolia, Aspasia, 1976-

2011-01-01T23:59:59.000Z

426

Low Cost, Durable Seal  

SciTech Connect (OSTI)

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

427

Renewable Energy Technology Costs and Drivers | Open Energy Information  

Open Energy Info (EERE)

Renewable Energy Technology Costs and Drivers Renewable Energy Technology Costs and Drivers Jump to: navigation, search Tool Summary Name: Renewable Energy Technology Costs and Drivers Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Renewable Energy Topics: Finance, Market analysis, Technology characterizations Resource Type: Publications Website: prod-http-80-800498448.us-east-1.elb.amazonaws.com//w/images/6/63/RE_C Renewable Energy Technology Costs and Drivers Screenshot References: Renewable Energy Technology Costs and Drivers[1] Summary "Provided herein is a preliminary, high-level summary of future and projected cost estimates for 1) Biofuels, 2) Solar (PV & CSP), and 3) Vehicle Batteries. Cost estimates are dependent on various assumptions and

428

Cost Type Examples Salary costs for staff working  

E-Print Network [OSTI]

Cost Type Examples Salary costs for staff working on the grant Fellows, research assistants by the technician can be supported by a verifiable audit trail. Specialist consultancy fees Recruitment costs Staff recruitment and advertising costs, including interviewee travel. Materials & consumables Laboratory chemicals

Rambaut, Andrew

429

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network [OSTI]

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling Oak Ridge National fiber reinforced composites have enjoyed limited acceptance in the automotive industry due to high costs to bond with composite matrix material. It is important that a carbon fiber manufacturing cost model

430

Architecture-Dependent Execution Time of Shor's Algorithm  

E-Print Network [OSTI]

We show how the execution time of algorithms on quantum computers depends on the architecture of the quantum computer, the choice of algorithms (including subroutines such as arithmetic), and the ``clock speed'' of the quantum computer. The primary architectural features of interest are the ability to execute multiple gates concurrently, the number of application-level qubits available, and the interconnection network of qubits. We analyze Shor's algorithm for factoring large numbers in this context. Our results show that, if arbitrary interconnection of qubits is possible, a machine with an application-level clock speed of as low as one-third of a (possibly encoded) gate per second could factor a 576-bit number in under one month, potentially outperforming a large network of classical computers. For nearest-neighbor-only architectures, a clock speed of around twenty-seven gates per second is required.

Rodney Van Meter; Kohei M. Itoh; Thaddeus D. Ladd

2006-05-25T23:59:59.000Z

431

Emission control cost-effectiveness of alternative-fuel vehicles  

SciTech Connect (OSTI)

Although various legislation and regulations have been adopted to promote the use of alternative-fuel vehicles for curbing urban air pollution problems, there is a lack of systematic comparisons of emission control cost-effectiveness among various alternative-fuel vehicle types. In this paper, life-cycle emission reductions and life-cycle costs were estimated for passenger cars fueled with methanol, ethanol, liquefied petroleum gas, compressed natural gas, and electricity. Vehicle emission estimates included both exhaust and evaporative emissions for air pollutants of hydrocarbon, carbon monoxide, nitrogen oxides, and air-toxic pollutants of benzene, formaldehyde, 1,3-butadiene, and acetaldehyde. Vehicle life-cycle cost estimates accounted for vehicle purchase prices, vehicle life, fuel costs, and vehicle maintenance costs. Emission control cost-effectiveness presented in dollars per ton of emission reduction was calculated for each alternative-fuel vehicle types from the estimated vehicle life-cycle emission reductions and costs. Among various alternative-fuel vehicle types, compressed natural gas vehicles are the most cost-effective vehicle type in controlling vehicle emissions. Dedicated methanol vehicles are the next most cost-effective vehicle type. The cost-effectiveness of electric vehicles depends on improvements in electric vehicle battery technology. With low-cost, high-performance batteries, electric vehicles are more cost-effective than methanol, ethanol, and liquified petroleum gas vehicles.

Wang, Q. [Argonne National Lab., IL (United States); Sperling, D.; Olmstead, J. [California Univ., Davis, CA (United States). Inst. of Transportation Studies

1993-06-14T23:59:59.000Z

432

Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley  

E-Print Network [OSTI]

). The request by USBR for a follow-up analysis and a brief report on revised ?final? key results, using the actual construction expense, was the impetus to this special report. page 2 of 12 Component #1: Interconnect between Canals 39 and 13-A1 Review of Project.../were based on reduced Rio Grande diversions and reduced relifting for this project component. Updated (Abridged) Results: Cost-of-Saving-Water and Three Legislative Values As depicted in Table 2, the revised comprehensive cost of saving water ($/ac...

Sturdivant, A. W.; Rister, M.; Lacewell, R. D.; Rogers, C. S.

433

Estimating SCR installation costs  

SciTech Connect (OSTI)

The EUCG surveyed 72 separate US installations of selective catalytic reduction (SCR) systems at coal-fired units totalling 41 GW of capacity to identify the systems' major cost drivers. The results, summarized in this article, provide excellent first-order estimates and guidance for utilities considering installing the downstream emissions-control technology. 4 figs., 1 tab.

Marano, M.; Sharp, G. [American Electric Power (United States)

2006-01-15T23:59:59.000Z

434

Invoice Statement of Cost Cost Type/Cost Share UT-B Contracts Div Page 1 of 1  

E-Print Network [OSTI]

Invoice Statement of Cost ­ Cost Type/Cost Share UT-B Contracts Div Aug 2009 Page 1 of 1 invoice-state-cost-ext-venx-aug09 Company Name: Statement of Amounts Claimed Invoice Number: Statement of Cost ­ Cost Type/Cost Cost Subcontractor Cost Job Title Name Current Hours Rate Current Amount Cumulative Hours Cumulative

Pennycook, Steve

435

Robust Cost Colorings Takuro Fukunaga  

E-Print Network [OSTI]

Robust Cost Colorings Takuro Fukunaga Magn´us M. Halld´orsson Hiroshi Nagamochi Abstract We consider graph coloring problems where the cost of a coloring is the sum of the costs of the colors, and the cost of a color is a monotone concave function of the total weight of the class. This models resource

Halldórsson, Magnús M.

436

Cost Estimates for New Molecules  

Science Journals Connector (OSTI)

Cost Estimates for New Molecules ... Once this has been carried out, the projected cost/kilogram for the new drug substance (if only raw material costs and no manufacturing/overhead/labour costs are considered) may well come down by a factor of 10 or even 100, and this is often more acceptable to management trying to make strategic decisions about potential profitability. ...

Trevor Laird

2005-02-22T23:59:59.000Z

437

Cost Sharing Why and How  

E-Print Network [OSTI]

Cost Sharing Why and How Trudy M. Riley Assistant Provost, Research Administration Susan M. Tkachick Sponsored Research Accountant $ Research Office #12;Research Office AGENDA What is Cost Sharing Why Cost Share What is Allowable Managing Cost Sharing during the life of the project What happens

Firestone, Jeremy

438

7 - Cost-Efficiency Evaluation  

Science Journals Connector (OSTI)

The purpose of cost-efficiency evaluations is to make the connection between cost and outcomes. Using methods like cost-benefit analysis and cost-effective analysis, this allows evaluators to provide the most complete information. The information may be used to make better decisions about implementation or continuing a program.

Gennaro F. Vito; George E. Higgins

2015-01-01T23:59:59.000Z

439

Temperature dependence of the gaps of high-temperature superconductors in the Fermi-arc region  

Science Journals Connector (OSTI)

It is shown how in a high-temperature superconductor, the length of the Fermi arc can be obtained from the doping dependence of the pseudogap and the superconducting gap. In the momentum region spanned by the Fermi arc, the pseudogap temperature dependence follows that of the superconducting gap. The close interconnection of the two gaps suggests that they are both an essential part of the high-temperature superconductivity.

S. Hfner and F. Mller

2008-07-23T23:59:59.000Z

440

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Cost Study Manual | Department of Energy  

Energy Savers [EERE]

Cost Study Manual Cost Study Manual Update 62912. Memo regarding Cost Study Manual Cost Study Manual More Documents & Publications Policy Flash 2013-62 Acquisition Letter 09 -...

442

Microsoft Word - Load Availability Profiles and Constraints for the Western Interconnect_102513_clean.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7E 7E Grid Integration of Aggregated Demand Response, Part I: Load Availability Profiles and Constraints for the Western Interconnection Daniel J. Olsen, Nance Matson, Michael D. Sohn, Cody Rose, Junqiao Dudley, Sasank Goli, and Sila Kiliccote Lawrence Berkeley National Laboratory Marissa Hummon, David Palchak, Paul Denholm, and Jennie Jorgenson National Renewable Energy Laboratory Ookie Ma U.S. Department of Energy September 2013 Disclaimer Acknowledgements Abstract Foreword Table of Contents List of Figures List of Tables Executive Summary Introduction ≤ ≤ ≤

443

Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Workshop December 8, 2011 Hilton St. Louis Airport, 10330 Natural Bridge Road, St. Louis, Missouri 63134 Presented by: Jerry Lein Public Utility Analyst North Dakota Public Service Commission Phone: 701 328-1035 Fax: 701 328-2410 jlein@nd.gov Overview * ND Electric Energy Resources * Need for New Transmission - Interconnection Difficulties - Transmission Constraints * Regional Transmission Projects Update * Capacity Deliverability between RTOs ND Electric Energy Resources * ND Ranked #1 in U.S. for Wind Energy Potential - 1991 Pacific Northwest Labs study found ND Wind could potentially supply 36% of U.S. electric energy consumption. -

444

A new relay for interconnected distribution in the UK -- Design and field experience  

SciTech Connect (OSTI)

The design of a new microprocessor based multifunctional relay for use on interconnected 33 kV circuits is described. The relay uses sequence component principles and rented low grade VF communication. It was needed urgently because rented metallic communication circuits, which are in widespread use, are being withdrawn in the UK. The relay development is unusual because of its measurement methods and because it can derive polarizing voltage from existing 11 kV VTs. The time scales required were such that development, field trials and installation phases overlapped. The field experience is described.

Sanderson, J.V.H.; Kyriakides, M.K. (Power Engineering Consultants Ltd., Cheshire (United Kingdom)); An, W. (UMIST, Manchester (United Kingdom)); Mackrell, A.J.; Postlethwaite, H.R.; Rogers, W.J.S.; Swinnerton, B.W. (Manweb plc, Chester (United Kingdom))

1994-01-01T23:59:59.000Z

445

Laser-welded Interconnection of Screen-printed Si Solar Cells  

Science Journals Connector (OSTI)

Abstract We demonstrate the laser welding of Al interconnects to the BSF rear-side of screen-printed two-side-contacted solar cells. The Al paste on the rear side of solar cell is laser-welded to an Al foil. This reduces the silver consumption of the solar cells by making silver pads on the rear side obsolete. Our proof-of-concept modules are free of laser damage. A 3-cell-module from 6 solar cells shows no change in fill factor within the statistical measurement uncertainty after artificial aging in 500 humidity-freeze cycles.

Henning Schulte-Huxel; Susanne Blankemeyer; Verena Steckenreiter; Sarah Kajari-Schroeder; Rolf Brendel

2014-01-01T23:59:59.000Z

446

Performance-aware Energy Saving Mechanism in Interconnection Networks for Parallel Systems  

Science Journals Connector (OSTI)

Abstract The growing processing power of parallel computing systems require interconnection networks a higher level of complexity and higher performance, thus consuming more energy. Link components contributes a substantial proportion of the total energy consumption of the networks. Many researchers have proposed approaches to judiciously change the link speed as a function of traffic to save energy when the traffic is light. However, the link speed reduction incurs an increase in average packet latency, thus degrades network performance. This paper addresses that issue with a performance-aware energy saving mechanism. The simulation results show that the proposed mechanism outperforms the energy saving mechanisms in literature.

Hai Nguyen; Daniel Franco; Emilio Luque

2014-01-01T23:59:59.000Z

447

Value of Improved Wind Power Forecasting in the Western Interconnection (Poster)  

SciTech Connect (OSTI)

Wind power forecasting is a necessary and important technology for incorporating wind power into the unit commitment and dispatch process. It is expected to become increasingly important with higher renewable energy penetration rates and progress toward the smart grid. There is consensus that wind power forecasting can help utility operations with increasing wind power penetration; however, there is far from a consensus about the economic value of improved forecasts. This work explores the value of improved wind power forecasting in the Western Interconnection of the United States.

Hodge, B.

2013-12-01T23:59:59.000Z

448

Monolithic interconnected module with a tunnel junction for enhanced electrical and optical performance  

DOE Patents [OSTI]

An improved thermophotovoltaic (TPV) n/p/n device is provided. Monolithic Interconnected Modules (MIMS), semiconductor devices converting infrared radiation to electricity, have been developed with improved electrical and optical performance. The structure is an n-type emitter on a p-type base with an n-type lateral conduction layer. The incorporation of a tunnel junction and the reduction in the amount of p-type material used results in negligible parasitic absorption, decreased series resistance, increased voltage and increased active area. The novel use of a tunnel junction results in the potential for a TPV device with efficiency greater than 24%.

Murray, Christopher S. (Bethel Park, PA); Wilt, David M. (Bay Village, OH)

2000-01-01T23:59:59.000Z

449

costs | OpenEI  

Open Energy Info (EERE)

7 7 Varnish cache server costs Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (11 months ago) Date Updated March 04th, 2013 (11 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

450

Residential photovoltaic systems costs  

SciTech Connect (OSTI)

A study of costs associated with the installation and operation of a residential photovoltaic system has been conducted to determine present and projected (1986) status. As a basis for the study, a residential photovoltaic system design projected for 1986 was assumed, consisting of two principal components: a roof-mounted array and a utility-interactive inverter. The scope of the study encompassed both silicon and cadmium sulfide photovoltaic modules. Cost estimates were obtained by a survey and study of reports generated by companies and agencies presently active in each of the subsystem area. Where necessary, supplemental estimates were established as part of this study. The range of estimates for silicon-based systems strongly suggest that such systems will be competitive for new installations and reasonably competitive for retrofit applications. The cadmium-sulfide-based system cost estimates, which are less certain than those for silicon, indicate that these systems will be marginally competitive with silicon-based systems for new construction, but not competitive for retrofit applications. Significant variations from the DOE system price sub-goals were found, however, particularly in the areas of array mounting, wiring and cleaning. Additional development work appears needed in these areas.

Cox, C.H. III

1980-01-01T23:59:59.000Z

451

Property:Cost(per day) | Open Energy Information  

Open Energy Info (EERE)

Cost(per day) Cost(per day) Jump to: navigation, search Property Name Cost(per day) Property Type String Pages using the property "Cost(per day)" Showing 25 pages using this property. (previous 25) (next 25) 1 1.5-ft Wave Flume Facility + Contact POC + 10-ft Wave Flume Facility + Contact POC + 11-ft Wave Flume Facility + Contact POC + 2 2-ft Flume Facility + Contact POC + 3 3-ft Wave Flume Facility + Contact POC + 5 5-ft Wave Flume Facility + Contact POC + 6 6-ft Wave Flume Facility + Contact POC + A Alden Large Flume + $5000/week + Alden Small Flume + $2500/week + Alden Tow Tank + Depends on study + Alden Wave Basin + Depends on study + B Breakwater Research Facility + Contact POC + Bucknell Hydraulic Flume + Depends on personnel requirements + C Carderock 2-ft Variable Pressure Cavitation Water Tunnel + Contact POC +

452

Three-dimensional CFD simulation of hydrodynamics in an interconnected fluidized bed for chemical looping combustion  

Science Journals Connector (OSTI)

Abstract A hydrodynamic model of an interconnected fluidized bed for chemical looping combustion was established based on the EulerianEulerian two-fluid model with the kinetic theory of granular flow. The effect of the drag model on the computational results was investigated and detailed hydrodynamics were predicted in the three-dimensional circulating fluidized bed (composed of a riser, bubbling bed, pot-seal and cyclone). Both qualitative and quantitative results indicated that the drag model had a significant effect on the flow behavior. The Gidaspow and the Syamlal & O'Brien drag models both produced accurate predictions in this study. The pressure balance of an interconnected fluidized bed revealed that the pressure in the bubbling bed was lower than that in the pot-seal and the riser, whilst still being higher than the pressure in the cyclone. The riser and bubbling bed were individually operated in fast and bubbling fluidization regions. The three distinct regions identified from the bottom to the top of the riser were: entrance region, bulk region and exit region. The solids volume fraction was higher in the near-wall region but lower in the center region for both the riser and bubbling bed. The coupled characteristics of the fluidized bed were predominantly identified by the strong effect of operational gas velocity in the riser on the hydrodynamics in the bubbling bed.

Yanjun Guan; Jian Chang; Kai Zhang; Baodong Wang; Qi Sun

2014-01-01T23:59:59.000Z

453

Developing TiAIN Coatings for Intermediate Temperature-Solid Oxide Fuel Cell Interconnect Applications  

SciTech Connect (OSTI)

TiN-type coatings have potential to be used as SOFC interconnect coatings SOFC because of their low resistance and high temperature stability. In this research, various (Ti,Al)N coatings were deposited on stainless steels by filtered-arc method. ASR and XRD tests were conducted on these coatings, and SEM/EDAX analysis were conducted after ASR and XRD tests. SEM/EDAX analyses show that (Ti,Al)N remains stable at temperature up to 700C. It is also indicated that Al has beneficial effect on the stability of TiN type coatings. At 900C, (Ti-30Al)N is fully oxidized and some of (Ti-50Al)N coating still remains as nitride. The analyses on cross-sectional samples show that these coatings are effective barrier to the Cr migration. In summary, (Ti.Al)N coatings are good candidates for the SOFC interconnect applications at 700C. The future directions of this research are to improve the stability of these coatings by alloy-doping and to develop multi-layer coatings.

Liu, X. (West Virginia University); Johnson, C.D.; Li, C. (West Virginia University); Xu, J. (West Virginia University); Cross, C.

2007-02-01T23:59:59.000Z

454

Electrodeposition of Mn-Co Alloys on Stainless Steels for SOFC Interconnect Application  

SciTech Connect (OSTI)

Chromium-containing ferritic stainless steels are the most popular materials for solid oxide fuel cell (SOFC) interconnect applications because of its oxidation resistance and easy fabrication process. However, excessive scale growth and chromium evaporation will degrade the cell performance. Highly conductive coatings that resist oxide scale growth and chromium evaporation may prevent both of these problems. Mn1.5Co1.5O4 spinel is one of the most promising coatings for interconnect application because of its high conducitivy, good chromium retention capability, as well as good CTE match. Electroplating of alloys or thin film multilayers followed by controlled oxidation to the desired spinel phase offers an additional deposition option. In the present study binary Mn/Co alloys was fabricated by electrodeposition, and polarization curves were used to characterize the cathodic reactions on substrate surface. By controlling the current density precisely, coatings with Mn/Co around 1:1 has been successfully deposited in Mn/Co =10 solutions, SEM and EDX was used to characterize the surface morphology and composition.

Wu, J. (West Virginia University); Jiang, Y. (West Virginia University); Johnson, C.; Gong, M. (West Virginia University); Liu, X. (West Virginia University)

2007-09-01T23:59:59.000Z

455

Fostering interconnectivity dimension of low-carbon cities: The triple bottom line re-interpretation  

Science Journals Connector (OSTI)

In facilitating the progress towards low-carbon cities, there is no lack of available green technologies, planning techniques, economic tools, social development strategies, etc. These technologies, strategies and techniques have, in fact, long been deployed in many cities and communities around the world. However, the outcomes have been somewhat slow and less than expected. This is also manifested in the lower-than-expectation outcomes of the formation of a meaningful global climate change treaty so far. The barriers have clearly been unveiled as disconnection among the triple bottom lines (TBL) in the approach. By linking the concept of low-carbon cities to sustainable development (informed by the TBL), the paper highlights the implication of misinterpretation of a popular TBL diagram, leading to fragmented, compromised approach to LCC. Cases in point are isolating and excluding social and economic activities that are not environmental friendly, and trading-off environmentally-friendly activities that are notprofitable in economic sense. Re-interpretation the popular TBL diagram literally from a three-dimensional lens offers an alternative approach, presented in an integrated framework towards low-carbon cities. The vital factors in the framework are safeguarding the positive dynamic interconnectivities of the three bottom lines, aligning their core values (in contrast to the isolating and excluding exercise), amplifying their common interest (instead of trading-off activities), and deploying strategies from planning, renewable technologies, education and policy making to address multiple and interconnected issues reciprocally.

Wynn Chi Nguyen Cam

2013-01-01T23:59:59.000Z

456

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343) (08/20/04)  

Broader source: Energy.gov (indexed) [DOE]

COB Energy Facility COB Energy Facility DECISION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the COB Energy Facility with the Federal Columbia River Transmission System (FCRTS), as proposed in the COB Energy Facility Final Environmental Impact Statement (FEIS) (DOE/EIS-0343, June 2004). Proposed by Peoples Energy Resources Company (PERC), the COB Energy Facility involves constructing and operating a new 1,160- megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 50.6-acre site near Bonanza in Klamath County, Oregon, and a 7.2-mile-long 500-kilovolt (kV) transmission line south to BPA's Captain Jack Substation. A Generation Interconnection Agreement with PERC would provide for interconnection of the COB Energy Facility with the FCRTS and

457

Low Cost Radio Telescope  

Science Journals Connector (OSTI)

A radio interferometer has been constructed at Haverford College as an aid to learning the fundamentals of radio astronomy. Its cost both in cash outlay and in construction time make it a feasible year-long project for an undergraduate. Its simplicity does not prevent it from being a useful instrument for instruction at the college or high-school level; among its capabilities are the measurement of the positions of at least four of the strongest discrete cosmic-noisesources and the diameter of the radio sun.

Joseph H. Taylor Jr.

1964-01-01T23:59:59.000Z

458

Wind Integration Cost and Cost-Causation: Preprint  

SciTech Connect (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

459

Reducing LED Costs Through Innovation  

Broader source: Energy.gov [DOE]

A Wisconsin-based company is developing an innovative way to reduce manufacturing costs of light-emitting diodes (LEDs).

460

Audit Report - Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009 OAS-RA-13-26 June 2013 Department of Energy Washington, DC 20585 June 19, 2013 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY FROM: Rickey R. Hass Deputy Inspector General for Audit and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009" BACKGROUND Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Cost Effectiveness NW Energy Coalition  

E-Print Network [OSTI]

1 Action 8 Cost Effectiveness Manual Kim Drury NW Energy Coalition Context · Inconsistent understanding of cost effectiveness contributed to under performing conservation E.g: individual measures vs at end of 2009 #12;2 The thinking was . . . That a Cost Effectiveness Guide could: · Increase regionally

462

The cost of a bodyguard  

Science Journals Connector (OSTI)

...research-article Animal behaviour 1001 60 70 14 The cost of a bodyguard Fanny Maure 1 2 * Jacques...benefits of host manipulation and their costs to fitness-related traits, such as longevity...study provides the first evidence of a cost required for manipulating host behaviour...

2011-01-01T23:59:59.000Z

463

Check Estimates and Independent Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

1997-03-28T23:59:59.000Z

464

ROC curves in cost space  

Science Journals Connector (OSTI)

ROC curves and cost curves are two popular ways of visualising classifier performance, finding appropriate thresholds according to the operating condition, and deriving useful aggregated measures such as the area under the ROC curve (AUC) or ... Keywords: Area Under the ROC Curve (AUC), Cost curves, Cost-sensitive evaluation, Kendall tau distance, Operating condition, ROC curves, Ranking performance

Jos Hernndez-Orallo; Peter Flach; Csar Ferri

2013-10-01T23:59:59.000Z

465

Historical pipeline construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for the pipeline construction cost, by analysing individual pipeline cost components with historical pipeline cost data. Cost data of 412 pipelines recorded between 1992 and 2008 in the Oil and Gas Journal are collected and adjusted to 2008 dollars with the chemical engineering plant cost index (CEPCI). The distribution and share of these 412 pipeline cost components are assessed based on pipeline diameter, pipeline length, pipeline capacity, the year of completion, locations of pipelines. The share of material and labour cost dominates the pipeline construction cost, which is about 71% of the total cost. In addition, the learning curve analysis is conducted to attain learning rate with respect to pipeline material and labour costs for different groups. Results show that learning rate and construction cost are varied by pipeline diameters, pipeline lengths, locations of pipelines and other factors. This study also investigates the causes of pipeline construction cost differences among different groups. [Received: October 13, 2010; Accepted: December 20, 2010

Zhenhua Rui; Paul A. Metz; Doug B. Reynolds; Gang Chen; Xiyu Zhou

2011-01-01T23:59:59.000Z

466

COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement that is not bourn by  

E-Print Network [OSTI]

1 COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement. There are primarily three types of cost sharing that may occur on sponsored projects: Mandatory cost sharing. For example, the National Science Foundation requires mandatory cost sharing for some of its projects. COST

Cui, Yan

467

Interaction between (La, Sr)MnO3 cathode and NiMoCr metallic interconnect with suppressed chromium vaporization for solid oxide fuel cells  

Science Journals Connector (OSTI)

Interaction between (La0.8Sr0.2)0.90MnO3 (LSM) cathode and newly developed NiMoCr metallic interconnect is investigated at 900C under operation conditions of solid oxide fuel cells (SOFCs). The results show that chromium deposition on the LSM cathodes in the presence of NiMoCr interconnect is remarkably reduced as compared to that in the presence of a conventional FeCr metallic interconnect (RA446). In contact with the NiMo-Cr interconnect the overpotential, ?, for the O2 reduction reaction on LSM cathode decreased from 529 to 111mV during the 1200min current passage at 200mA/cm2. In contrast, ? increased from 464 to 561mV for the reaction in the presence of a RA446 interconnect. The decrease in ? clearly indicates that chromium poisoning effect of the NiMoCr interconnect is also significantly suppressed as compared to that with conventional FeCr interconnect materials. The suppressed Cr deposition and poisoning effects observed on the LSM cathodes demonstrate promising potential of the NiMoCr alloy as new interconnect materials with significant suppressed chromium vaporization and deposition for SOFCs.

Xinbing Chen; Bin Hua; Jian Pu; Jian Li; Lan Zhang; San Ping Jiang

2009-01-01T23:59:59.000Z

468

A G LO BA L P OW E R TECHNOLO GIES CO M PA N Y SolarTieTM Grid Interconnection Solution  

E-Print Network [OSTI]

G f· Shipments to date sufficient to power 10 GW of wind power SWind Plant Interconnection Solutions's Wind-Generated Electricity "Powered by AMSC®" Wind Turbine Designs, Controls & Converters · Relied upon utilized at more than 70 wind plants worldwide · Shipments to date sufficient to allow interconnection 4 p

Homes, Christopher C.

469

Electrical and Optical On-Chip Interconnects in Scaled Microprocessors Guoqing Chen, Hui Chen, Mikhail Haurylau, Nicholas Nelson, David Albonesi, Philippe M. Fauchet, and Eby G. Friedman  

E-Print Network [OSTI]

Electrical and Optical On-Chip Interconnects in Scaled Microprocessors Guoqing Chen, Hui Chen of Electrical and Computer Engineering University of Rochester, Rochester, New York, 14627 Department of Electrical and Computer Engineering Cornell University, Ithaca, New York, 14853 Abstract-- Interconnect has

Albonesi, David H.

470

1068 IEEE TRANSACTIONS ON VERY LARGE SCALE INTEGRATION (VLSI) SYSTEMS, VOL. 11, NO. 6, DECEMBER 2003 Equivalent-Circuit Interconnect Modeling Based on  

E-Print Network [OSTI]

-chip long interconnects that are represented as distributed RLC transmission lines. The proposed delay model transmission line model, equivalent circuit, interconnect modeling, passivity, transient simulation. I as distributed RLC transmission lines. Manuscript received December 3, 2002. This work was supported in part

Mazumder, Pinaki

471

17.2 - Cost Participation  

Broader source: Energy.gov (indexed) [DOE]

17.2 (June 2004) 17.2 (June 2004) 1 Cost Participation [Reference: FAR 35.003(b), DEAR 917.70] Overview This section discusses DOE treatment of cost participation by organizations performing research, development, and demonstration projects under DOE prime contracts. This section does not cover efforts and projects performed for DOE by other Federal agencies. Background Cost participation is a generic term denoting any situation where the Government does not fully reimburse the contractor for all allowable costs necessary to accomplish the project or effort under the contract. The term includes, but is not limited to: * Cost Sharing * Cost Matching * Cost Limitation, which may be direct or indirect * Participation in-kind

472

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

473

Heliostat cost-analysis tool  

SciTech Connect (OSTI)

Estimated production costs of solar energy systems serve as guides for future component development and as measures of the potential economic viability of the technologies. The analysis of heliostat costs is particularly important since the heliostat field is the largest cost component of a solar central receiver plant. A heliostat cost analysis tool (HELCAT) that processes manufacturing, transportation, and installation cost data has been developed to provide a consistent structure for cost analyses. HELCAT calculates a representative product price based on direct input data (e.g. direct materials, direct labor, capital requirements) and various economic, financial, and accounting assumptions. The characteristics of this tool and its initial application in the evaluation of second generation heliostat cost estimates are discussed. A set of nominal economic and financial parameters is also suggested.

Brandt, L.D.; Chang, R.E.

1981-10-01T23:59:59.000Z

474

Review of Back Contact Silicon Solar Cells for Low-Cost Application  

SciTech Connect (OSTI)

Back contact solar cells hold significant promise for increased performance in photovoltaics for the near future. Two major advantages which these cells possess are a lack of grid shading loss and coplanar interconnection. Front contacted cells can have up to 10% shading loss when using screen printed metal grids. A front contact cell must also use solder connections which run from the front of one cell to the back of the next for series interconnection. This procedure is more difficult to automate than the case of co-planar contacts. The back contact cell design is not a recent concept. The earliest silicon solar cell developed by Bell Labs was a back contact device. There have been many design modifications to the basic concept over the years. To name a few, there is the Interdigitated Back Contact (IBC) cell, the Stanford Point contact solar cell, the Emitter Wrap Through (EWT), and its many variations. A number of these design concepts have demonstrated high efficiency. The SunPower back contact solar cell holds the efficiency record for silicon concentrator cells. The challenge is to produce a high efficiency cell at low cost using high throughput techniques. This has yet to be achieved with a back contact cell design. The focus of this paper will be to review the relevant features of back contact cells and progress made toward the goal of a low cost version of this device.

Smith, David D.

1999-08-04T23:59:59.000Z

475

Electrode and method of interconnection sintering on an electrode of an electrochemical cell  

DOE Patents [OSTI]

An electrode structure is made by applying a base layer of doped LaCrO[sub 3] particles on a portion of an electrode and then coating the particles with a top layer composition such as CaO+Al[sub 2]O[sub 3], SrO+Al[sub 2]O[sub 3], or BaO+Al[sub 2]O[sub 3], and then heating the composition for a time effective to melt the composition and allow it to fill any open porosity in the base layer of doped LaCrO[sub 3] to form an interconnection, after which solid oxide electrolyte can be applied to the remaining portion of the electrode and the electrolyte can be covered with a cermet exterior electrode. 2 figures.

Ruka, R.J.; Kuo, L.J.H.

1994-01-11T23:59:59.000Z

476

Vibration control in plates by uniformly distributed PZT actuators interconnected via electric networks  

E-Print Network [OSTI]

In this paper a novel device aimed at controlling the mechanical vibrations of plates by means of a set of electrically-interconnected piezoelectric actuators is described. The actuators are embedded uniformly in the plate wherein they connect every node of an electric network to ground, thus playing the two-fold role of capacitive element in the electric network and of couple suppliers. A mathematical model is introduced to describe the propagation of electro-mechanical waves in the device; its validity is restricted to the case of wave-forms with wave-length greater than the dimension of the piezoelectric actuators used. A self-resonance criterion is established which assures the possibility of electro-mechanical energy exchange. Finally the problem of vibration control in simply supported and clamped plates is addressed; the optimal net-impedance is determined. The results indicate that the proposed device can improve the performances of piezoelectric actuation

Stefano Vidoli; Francesco dell'Isola

2010-07-09T23:59:59.000Z

477

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A. Ege Engin and Madhavan Swaminathan  

E-Print Network [OSTI]

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A occurs at discontinuities of the transmission line, wherever there is an interruption of the current that is connected to a transmission line. To reduce this discontinuity, current designs try to maintain a low

Swaminathan, Madhavan

478

Discrete Event Simulation of QoS of a SCADA System Interconnecting a Power Grid and a Telco Network  

E-Print Network [OSTI]

Discrete Event Simulation of QoS of a SCADA System Interconnecting a Power Grid and a Telco Network, Telco network and Power grid act as a whole heterogeneous network. While SCADA system and Telco network can be well represented by means of discrete event simulators. To represent a Power grid a continuous

Paris-Sud XI, Université de

479

On-Chip Copper-Based vs. Optical Interconnects: Delay Uncertainty, Latency, Power, and Bandwidth Density Comparative Predictions  

E-Print Network [OSTI]

On-Chip Copper-Based vs. Optical Interconnects: Delay Uncertainty, Latency, Power, and Bandwidth. Albonesi, Philippe M. Fauchet, and Eby G. Friedman Department of Electrical and Computer Engineering of Rochester, Rochester, New York, 14627 Department of Electrical and Computer Engineering,Cornell University

Friedman, Eby G.

480

Hierarchical interconnections in the nano-composite material Bone: Fibrillar Cross-Links resist fracture on several length scales  

E-Print Network [OSTI]

Hierarchical interconnections in the nano-composite material Bone: Fibrillar Cross-Links resist bone samples, possibly resisting the propagation of these cracks. Bone is one of the most important collagen and hydroxyapatite. Such materials are based on the crystal-polymer interactions on the molecular

Fygenson, Deborah Kuchnir

Note: This page contains sample records for the topic "interconnection costs depending" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

624 IEEE JOURNAL ON SELECTED TOPICS IN QUANTUM ELECTRONICS, VOL. 9, NO. 2, MARCH/APRIL 2003 Optoelectronic Interconnection Technology  

E-Print Network [OSTI]

Optoelectronic Interconnection Technology in the HOLMS System Paul Lukowicz, Member, IEEE, Jürgen Jahns, Member. Süllau, J. F. Snowdon, M. Wirz, and G. Tröster Invited Paper Abstract--The High-Speed Optoelectronic and economical by developing optoelectronic packaging tech- nology compatible with standard electronic assembly

Jahns, Jürgen

482

Optoelectronic Interconnects XIII (OE112) Conference Chairs: Alexei L. Glebov, OptiGrate Corp. (USA); Ray T. Chen, The Univ.  

E-Print Network [OSTI]

Optoelectronic Interconnects XIII (OE112) Conference Chairs: Alexei L. Glebov, OptiGrate Corp. (USA); Ray T. Chen, The Univ. of Texas at Austin (USA) Program Committee: Bill Blubaugh, US Conec Ltd. (USA); Swapnajit Chakravarty, Omega Optics, Inc. (USA); John E. Cunningham, Oracle (USA); Allen M. Earman, Intersil

Jahns, Jürgen

483

Levelised cost of electricity for organic photovoltaics  

Science Journals Connector (OSTI)

Abstract The success of organic photovoltaics (OPVs) as a future energy source is entirely dependent on the cost of the electricity produced by the modules. This study provides the first commercial scale levelised cost of electricity (LCOE) estimates for \\{OPVs\\} by integrating OPV-specific measured and calculated data into the estimates. The impacts of physical and financial variables are also investigated. The study shows that \\{OPVs\\} will become equivalently priced with current conventional solar technologies when efficiencies of 2% and lifetimes of three years are achieved. At efficiencies of 5% and lifetimes of 35 years the LCOE for \\{OPVs\\} will be competitive with that of current coal-based electricity generation.

Cara J. Mulligan; Chhinder Bilen; Xiaojing Zhou; Warwick J. Belcher; Paul C. Dastoor

2015-01-01T23:59:59.000Z

484

LIFE CYCLE COST HANDBOOK Guidance for Life Cycle Cost Estimation...  

Office of Environmental Management (EM)

of the parts of a cost estimate (those elements not truly independent of each other in terms of their accuracy and expected values), consider evaluating certain elements as...

485

Energy Tips: Benchmark the Fuel Cost of Steam Generation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Type (sales unit) Type (sales unit) Energy Content Combustion (Btu/sales unit) Efficiency (%) Natural Gas (therm) 100,000 81.7 Natural Gas (cubic foot) 1,030 81.7 Distillate/No. 2 Oil (gallon) 138,700 84.6 Residual/No. 6 Oil (gallon) 149,700 86.1 Coal (ton) 27,000,000 87.6 Benchmark the Fuel Cost of Steam Generation Benchmarking the fuel cost of steam generation ($/1000 lbs of steam) is an effective way to assess the efficiency of your steam system. This cost is dependent upon fuel type, unit fuel cost, boiler efficiency, feedwater temperature, and steam pressure. This calculation provides a good first approximation for the cost of generating steam and serves as a tracking device to allow for boiler performance monitoring. Table 1 shows the heat input required to produce one pound of saturated

486

Year Average Transportation Cost of Coal  

Gasoline and Diesel Fuel Update (EIA)

delivered costs of coal, by year and primary transport mode Year Average Transportation Cost of Coal (Dollars per Ton) Average Delivered Cost of Coal (Dollars per Ton)...

487

Project Cost Profile Spreadsheet | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet.xlsx More Documents & Publications Statement of Work (SOW) Template (Combined...

488

EGov PMA Scorecard Cost, Schedule & Performance Standard...  

Energy Savers [EERE]

EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule &...

489

Hydrogen Threshold Cost Calculation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Threshold Cost Calculation Hydrogen Threshold Cost Calculation DOE Hydrogen Program Record number11007, Hydrogen Threshold Cost Calculation, documents the methodology and...

490

High Energy Cost Grants | Department of Energy  

Energy Savers [EERE]

High Energy Cost Grants High Energy Cost Grants The High Energy Cost Grant Program provides financial assistance for the improvement of energy generation, transmission, and...

491

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

Subject An Examination of Avoided Costs in Utah Date Januarystate by seeking changes to the avoided cost tariff paid tomethod of calculating avoided costs that has been officially

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

492

Production and cost analysis of the Bitterroot Miniyarder in Appalachia  

SciTech Connect (OSTI)

Silvicultural prescription (clearcut or partial cut) and av. price weight removed most significantly affected yarding cost for the yarder operating in clearcuts and partial cuts with a 4-man crew. Yarding cost estimates ranged from US$8-25/ton, depending on silviculture prescription, tons removed per acre, and unit shape where the av. piece removed weighed >200lb. With pieces weighing <200lb, yarding cost estimates increased rapidly, approaching $40/ton when the av. piece removed weighed 100lb. Estimates for complex harvest units could be prepared by treating them as composites of fan, parallel, and reverse fan unit.

Peter, P.A.; Baumgras, J.E.

1984-01-01T23:59:59.000Z

493

Download Data | Transparent Cost Database  

Open Energy Info (EERE)

in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a...

494

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost... LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

495

Reviewing electricity generation cost assessments.  

E-Print Network [OSTI]

?? Studies assessing the electricity generation cost of various power generating technologies are becoming increasingly common and references to such studies can often be heard (more)

Larsson, Simon

2012-01-01T23:59:59.000Z

496

Building Life Cycle Cost Programs  

Broader source: Energy.gov [DOE]

The National Institute of Standards and Technology (NIST) developed the Building Life Cycle Cost (BLCC) Program to provide computational support for the analysis of capital investments in buildings.

497

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

performing fiber. (600-750 KSI) Barriers: Addresses the need for higher performance low cost fiber for hydrogen storage tanks and energy management structures of automobiles....

498

Audit Costs for the 1986 Texas Energy Cost Containment Program  

E-Print Network [OSTI]

Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities...

Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

1987-01-01T23:59:59.000Z

499

Costs of Storing and Transporting Hydrogen  

Broader source: Energy.gov [DOE]

An analysis was performed to estimate the costs associated with storing and transporting hydrogen. These costs can be added to a hydrogen production cost to determine the total delivered cost of hydrogen.

500

Use of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

1997-03-28T23:59:59.000Z