  1. Module 7 - Integrated Baseline Review and Change Control | Department of

    Energy Savers [EERE]

    Energy 7 - Integrated Baseline Review and Change Control Module 7 - Integrated Baseline Review and Change Control This module focuses on integrated baseline reviews (IBR) and change control. This module outlines the objective and responsibility of an integrated baseline review. Additionally, this module will discuss the change control process required for implementing earned value

  2. EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process...

    Energy Savers [EERE]

    2 Integrated Baseline Review (IBR) Process EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process This EVMS Training Snippet sponsored by the Office of Project...

  3. EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet sponsored by the Office of Project Management (PM) covers the Integrated Baseline Review (IBR) process. 

  4. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) covers how to review an Integrated Master Schedule (IMS) and highlights common areas of non-compliance with ANSI/EIA...

  5. Gated integrator with signal baseline subtraction

    DOE Patents [OSTI]

    Wang, Xucheng

    1996-01-01

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window.

  6. Gated integrator with signal baseline subtraction

    DOE Patents [OSTI]

    Wang, X.

    1996-12-17

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window. 5 figs.

  7. Integrated Baseline System (IBS) Version 2.0: Models guide

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Models Guide summarizes the IBS use of several computer models for predicting the results of emergency situations. These include models for predicting dispersion/doses of airborne contaminants, traffic evacuation, explosion effects, heat radiation from a fire, and siren sound transmission. The guide references additional technical documentation on the models when such documentation is available from other sources. The audience for this manual is chiefly emergency management planners and analysts, but also data managers and system managers.

  8. Integrated Baseline System (IBS) Version 1.03: Utilities guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Pottier, M.C.; Schrank, E.E.; Williams, J.R.

    1993-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This Utilities Guide explains how to operate utility programs that are supplied as a part of the IBS. These utility programs are chiefly for managing and manipulating various kinds of IBS data and system administration files. Many of the utilities are for creating, editing, converting, or displaying map data and other data that are related to geographic location.

  9. Integrated Baseline System (IBS) Version 2.0: Utilities Guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Williams, J.R.; Bower, J.C.

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Utilities Guide explains how you can use the IBS utility programs to manage and manipulate various kinds of IBS data. These programs include utilities for creating, editing, and displaying maps and other data that are referenced to geographic location. The intended audience for this document are chiefly data managers but also system managers and some emergency management planners and analysts.

  10. Integrated Baseline Bystem (IBS) Version 1.03: Models guide

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Integrated Baseline System)(IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planning and analysis. This document is the models guide for the IBS and explains how to use the emergency related computer models. This document provides information for the experienced system user, and is the primary reference for the computer modeling software supplied with the system. It is designed for emergency managers and planners, and others familiar with the concepts of computer modeling. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other IBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary.

  11. Baseline review of the U.S. LHC Accelerator project

    SciTech Connect (OSTI)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O`Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as the baseline scope with the firm expectation that additional scope will be restored to the baseline as the project moves forward. The Committee supports the FY 1998 work plan and scope of deliverables but strongly recommends the reevaluation of costs and schedules with the goal of producing a plan for restoring the US deliverables to CERN. This plan should provide precise dates when scope decisions must be made.

  12. Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

    1994-01-01

    This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

  13. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  14. Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  15. Mixed waste focus area integrated technical baseline report. Phase I, Volume 2: Revision 0

    SciTech Connect (OSTI)

    1996-01-16

    This document (Volume 2) contains the Appendices A through J for the Mixed Waste Focus Area Integrated Technical Baseline Report Phase I for the Idaho National Engineering Laboratory. Included are: Waste Type Managers` Resumes, detailed information on wastewater, combustible organics, debris, unique waste, and inorganic homogeneous solids and soils, and waste data information. A detailed list of technology deficiencies and site needs identification is also provided.

  16. Data Management Guide: Integrated Baseline System (IBS). Version 2.1

    SciTech Connect (OSTI)

    Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)] Bower Software Services, Kennewick, Washington (United States); Burford, M.J.; Downing, T.R.; Moise, M.C.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States)] Pacific Northwest Lab., Richland, WA (United States)

    1995-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using the site map database.

  17. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  18. Integrated Baseline System (IBS). Version 1.03, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R.; Bailey, S.; Bower, J.C.

    1993-01-01

    This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide also includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.

  19. 2014 Annual Merit review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    review Results Report - Technology Integration 2014 Annual Merit review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities PDF ...

  20. Microsoft PowerPoint - Snippet 3.1A IMS Initial Baseline Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and risk. This snippet is recommended whenever a schedule baseline is created or revised. 1 The Contract is the prevailing document regarding what Earned Value Management ...

  1. Renewable Diesel from Algal Lipids: An Integrated Baseline for Cost, Emissions, and Resource Potential from a Harmonized Model

    SciTech Connect (OSTI)

    Davis, R.; Fishman, D.; Frank, E. D.; Wigmosta, M. S.; Aden, A.; Coleman, A. M.; Pienkos, P. T.; Skaggs, R. J.; Venteris, E. R.; Wang, M. Q.

    2012-06-01

    The U.S. Department of Energy's Biomass Program has begun an initiative to obtain consistent quantitative metrics for algal biofuel production to establish an 'integrated baseline' by harmonizing and combining the Program's national resource assessment (RA), techno-economic analysis (TEA), and life-cycle analysis (LCA) models. The baseline attempts to represent a plausible near-term production scenario with freshwater microalgae growth, extraction of lipids, and conversion via hydroprocessing to produce a renewable diesel (RD) blendstock. Differences in the prior TEA and LCA models were reconciled (harmonized) and the RA model was used to prioritize and select the most favorable consortium of sites that supports production of 5 billion gallons per year of RD. Aligning the TEA and LCA models produced slightly higher costs and emissions compared to the pre-harmonized results. However, after then applying the productivities predicted by the RA model (13 g/m2/d on annual average vs. 25 g/m2/d in the original models), the integrated baseline resulted in markedly higher costs and emissions. The relationship between performance (cost and emissions) and either productivity or lipid fraction was found to be non-linear, and important implications on the TEA and LCA results were observed after introducing seasonal variability from the RA model. Increasing productivity and lipid fraction alone was insufficient to achieve cost and emission targets; however, combined with lower energy, less expensive alternative technology scenarios, emissions and costs were substantially reduced.

  2. 2008 Annual Merit Review Results Summary - 16. Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6. Technology Integration and Education 2008 Annual Merit Review Results Summary - 16. Technology Integration and Education DOE Vehicle Technologies Annual Merit Review PDF icon ...

  3. 2012 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration 2012 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities PDF icon 2012amr08.pdf More ...

  4. 2013 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration 2013 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities PDF icon 2013amr08.pdf More ...

  5. NEPA and CEQA: Integrating State and Federal Environmental Reviews...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft) The Council on ... & Publications NEPA and CEQA: Integrating State and Federal Environmental Reviews (Final

  6. Review of Variable Generation Integration Charges

    SciTech Connect (OSTI)

    Porter, K.; Fink, S.; Buckley, M.; Rogers, J.; Hodge, B. M.

    2013-03-01

    The growth of wind and solar generation in the United States, and the expectation of continued growth of these technologies, dictates that the future power system will be operated in a somewhat different manner because of increased variability and uncertainty. A small number of balancing authorities have attempted to determine an 'integration cost' to account for these changes to their current operating practices. Some balancing authorities directly charge wind and solar generators for integration charges, whereas others add integration charges to projected costs of wind and solar in integrated resource plans or in competitive solicitations for generation. This report reviews the balancing authorities that have calculated variable generation integration charges and broadly compares and contrasts the methodologies they used to determine their specific integration charges. The report also profiles each balancing authority and how they derived wind and solar integration charges.

  7. EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review EVMS Training Snippet: 4.6 Baseline Control Methods EVMS Training Snippet: 4.9 High-level EVM...

  8. Vandenberg Air Force Base integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Halverson, M.A.; Richman, E.E.; Dagle, J.E.; Hickman, B.J.; Daellenbach, K.K.; Sullivan, G.P.

    1993-06-01

    The US Air Force Space Command has tasked the Pacific Northwest Laboratory, as the lead laboratory supporting the US Department of Energy Federal Energy Management Program, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is a model program PNL is designing for federal customers served by the Pacific Gas and Electric Company (PG and E). The primary goal of the VAFB project is to identify all electric energy efficiency opportunities, and to negotiate with PG and E to acquire those resources through a customized demand-side management program for its federal clients. That customized program should have three major characteristics: (1) 100% up-front financing; (2) substantial utility cost-sharing; and (3) utility implementation through energy service companies under contract to the utility. A similar arrangement will be pursued with Southern California Gas for non-electric resource opportunities if that is deemed desirable by the site and if the gas utility seems open to such an approach. This report documents the assessment of baseline energy use at VAFB located near Lompoc, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Resource Assessment. This analysis examines the characteristics of electric, natural gas, fuel oil, and propane use for fiscal year 1991. It records energy-use intensities for the facilities at VAFB by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A more complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, and applicable losses.

  9. 2009 Integrated Biorefinery Platform Review Report

    SciTech Connect (OSTI)

    Ferrell, John

    2009-12-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy Biomass Program‘s Integrated Biorefinery (IBR) platform review meeting, held on February 18–19, 2009, at the Westin National Harbor, National Harbor, Maryland.

  10. Integrated Dry NO sub x /SO sub 2 Emissions Control System baseline test report, November 11--December 15, 1991

    SciTech Connect (OSTI)

    Shiomoto, G.H.; Smith, R.A.

    1992-03-01

    The DOE sponsored Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System program, which is a Clean Coal Technology Ill demonstration, is being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, which is a 100 MWe, down-fired utility boiler burning a low sulfur western coal. The project goal is to demonstrate 70 percent reductions in NO{sub x} and S0{sub 2} emissions through the integration of: (1) down-fired low-NO{sub x} burners with overfire air; (2) urea injection for additional NO{sub x} removal; and (3) dry sorbent injection and duct humidification for SO{sub 2} removal. The effectiveness of the integrated system on a high sulfur coal will also be tested. This report documents the first baseline test results conducted during the program. The baseline tests were conducted with the original burners and auxiliary equipment and represent the unmodified boiler emissions. The burner design of Arapahoe Unit 4 results in relatively high NO{sub x} levels ranging from 740 to 850 ppM (corrected to 3% O{sub 2}, dry) over the load range. Excess air level was the primary factor influencing NO{sub x} emissions. During normal boiler operations, there was a wide range in NO{sub x} emissions, due to the variations of excess air, boiler load and other, secondary parameters. SO{sub 2} emissions ranged from 350 to 600 ppM (corrected to 3% O{sub 2}, dry) and reflected variations in the coal sulfur content.

  11. Vehicle Technologies Office Merit Review 2015: Impact Analysis: VTO Baseline and Scenario (BaSce) Activities

    Broader source: Energy.gov [DOE]

    Presentation given by Argonne National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about impact analysis:...

  12. Vehicle Technologies Office Merit Review 2014: Impact Analysis: VTO Baseline and Scenario (BaSce) Activities

    Broader source: Energy.gov [DOE]

    Presentation given by Argonne National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about impact analysis...

  13. NREL: Transmission Grid Integration - Technical Review Committee Principles

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Integration Studies Technical Review Committee Principles for Integration Studies Working with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), the Utility Wind Integration Group has issued a set of principles for Technical Review Committee participation in wind integration studies. Coming from years of Utility Wind Integration Group and NREL Technical Review Committee involvement in a number of wind integration studies, this document provides guidance for

  14. Commercial Buildings Integration Program Overview - 2013 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3 BTO Peer Review Commercial Buildings Integration Program Overview - 2013 BTO Peer Review Commercial Buildings Integration Program Presentation for the 2013 Building Technologies Office's Program Peer Review PDF icon cbi_overview_schuur_040213.pdf More Documents & Publications Commercial Building Integration Program Overview - 2014 BTO Peer Review Better Buildings Alliance - 2013 BTO Peer Review Technology Performance Exchange - 2013 BTO Peer Review

  15. National integrated mitigation planning in agriculture: A review...

    Open Energy Info (EERE)

    National integrated mitigation planning in agriculture: A review paper This review of national greenhouse gas (GHG) mitigation planning in the agriculture sector has two...

  16. CRAD, Integrated Safety Basis and Engineering Design Review ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Basis and Engineering Design Review - August 20, 2014 (EA CRAD 31-4, Rev. 0) CRAD, Integrated Safety Basis and Engineering Design Review - August 20, 2014 (EA...

  17. Vehicle Technologies Office Merit Review 2015: Integrated Computationa...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineering Approach to Development of Lightweight 3GAHSS Vehicle Assembly Vehicle Technologies Office Merit Review 2015: Integrated Computational Materials Engineering ...

  18. Residential Buildings Integration Program Overview - 2016 BTO Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 6 BTO Peer Review Residential Buildings Integration Program Overview - 2016 BTO Peer Review Presenter: David Lee, U.S. Department of Energy This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. PDF icon 2016 BTO Peer Review Presentation-Residential Buildings Integration

  19. MHD Technology Transfer, Integration and Review Committee

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    As part of the MHD Integrated Topping Cycle (ITC) project, TRW was given the responsibility to organize, charter and co-chair, with the Department of Energy (DOE), an MHD Technology Transfer, Integration and Review Committee (TTIRC). The Charter of the TTIRC, which was approved by the DOE in June 1988 and distributed to the committee members, is included as part of this Summary. As stated in the Charter, the purpose of this committee is to: (1) review all Proof-of-Concept (POC) projects and schedules in the national MHD program; to assess their compatibility with each other and the first commercial MHD retrofit plant; (2) establish and implement technology transfer formats for users of this technology; (3) identify interfaces, issues, and funding structures directly impacting the success of the commercial retrofit; (4) investigate and identify the manner in which, and by whom, the above should be resolved; and (5) investigate and assess other participation (foreign and domestic) in the US MHD Program. The DOE fiscal year 1989 MHD Program Plan Schedule is included at the end of this Summary. The MHD Technology Transfer, Integration and Review Committee's activities to date have focused primarily on the technology transfer'' aspects of its charter. It has provided a forum for the dissemination of technical and programmatic information among workers in the field of MHD and to the potential end users, the utilities, by holding semi-annual meetings. The committee publishes this semi-annual report, which presents in Sections 2 through 11 capsule summaries of technical progress for all DOE Proof-of-Concept MHD contracts and major test facilities.

  20. Commercial Buildings Integration Program Overview - 2015 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 BTO Peer Review Commercial Buildings Integration Program Overview - 2015 BTO Peer Review Presenter: Kristen Taddonio, U.S. Department of Energy This presentation at the 2015 Peer Review provided an overview of the Building Technologies Office's Commercial Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and future designs. VIEW THE PRESENTATION PDF icon Commercial Building Integration Program Overview - 2015

  1. Residential Buildings Integration Program Overview - 2014 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4 BTO Peer Review Residential Buildings Integration Program Overview - 2014 BTO Peer Review Presenter: David Lee, U.S. Department of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. View the presentation PDF icon Residential Buildings Integration Program Overview -

  2. Residential Buildings Integration Program Overview - 2015 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 BTO Peer Review Residential Buildings Integration Program Overview - 2015 BTO Peer Review Presenter: David Lee, U.S. Department of Energy This presentation at the 2015 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. VIEW THE PRESENTATION PDF icon Residential Buildings Integration Program Overview -

  3. Hazard baseline documentation

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This DOE limited technical standard establishes uniform Office of Environmental Management (EM) guidance on hazards baseline documents that identify and control radiological and nonradiological hazards for all EM facilities. It provides a road map to the safety and health hazard identification and control requirements contained in the Department`s orders and provides EM guidance on the applicability and integration of these requirements. This includes a definition of four classes of facilities (nuclear, non-nuclear, radiological, and other industrial); the thresholds for facility hazard classification; and applicable safety and health hazard identification, controls, and documentation. The standard applies to the classification, development, review, and approval of hazard identification and control documentation for EM facilities.

  4. 2011 Biomass Program Platform Peer Review: Integrated Biorefineries |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Integrated Biorefineries 2011 Biomass Program Platform Peer Review: Integrated Biorefineries "This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy Biomass Programs Integrated Biorefinery Platform Review meeting, held on February 1...3, 2011, at the U.S. Department of Energy, Washington, D.C." PDF icon 2011_ibr_review.pdf More Documents & Publications 2011 Biomass

  5. 2013 Peer Review Presentations-Integrated Biorefineries | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Integrated Biorefineries 2013 Peer Review Presentations-Integrated Biorefineries The Bioenergy Technologies Office hosted its 2013 Project Peer Review on May 20-24, 2015, at the Hilton Mark Center in Alexandria, Virginia. The presentations from integrated biorefineries session are available to view and download below. For detailed session descriptions and presentation titles, view the 2013 Project Peer Review Program Booklet. PDF icon ibr_cesaek_55101.pdf PDF icon ibr_cherry_5141.pdf

  6. Commercial Buildings Integration Program Overview — 2016 BTO Peer Review

    Broader source: Energy.gov [DOE]

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office’s Commercial Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  7. 2013 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review Results Report - Technology Integration EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT,...

  8. Vehicle Technologies Office Merit Review 2015: Integrated Network...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Integrated Network Testbed for Energy Grid Research and...

  9. Microsoft PowerPoint - Snippet 4.2 Integrated Baseline Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its relationship to the underlying Earned Value Management (EVM) systems and processes ... process risk areas, as well as develop confidence in the project's operating plans. ...

  10. Commercial Building Integration Program Overview - 2014 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Integration Program Overview - 2014 BTO Peer Review Commercial Building Integration Program Overview - 2014 BTO Peer Review Presenter: Arah Schuur, U.S. Department of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Appliance and Equipment Standards Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and future designs. View the presentation PDF icon

  11. Independent Oversight Review of Integrated Safety Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on LSO's most recent assessment of LLNL's contractor ... and the request for peer reviews and independent HSS reviews, show that LSO is a learning organization and that ...

  12. Biomass Program 2007 Peer Review - Integrated Biorefinery Platform Summary

    SciTech Connect (OSTI)

    none,

    2009-10-27

    This document discloses the comments provided by a review panel at the U.S. Department of Energy Office of the Biomass Program Peer Review held on November 15-16, 2007 in Baltimore, MD and the Integrated Biorefinery Platform Review held on August 13-15, 2007 in Golden, Colorado.

  13. Experts Review Tank Integrity Program at Hanford

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – An expert panel met this month to discuss the integrity of double-shell tank AY-102 on behalf of EM’s Office of River Protection (ORP).

  14. NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)

    Energy Savers [EERE]

    | Department of Energy Draft) NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft) The Council on Environmental Quality (CEQ), in collaboration with the California Governor's Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and California Environmental Quality Act (CEQA) review processes. The guide provides practitioners with an overview of NEPA and CEQA as well as valuable suggestions for developing a single environmental

  15. Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System baseline test report, November 11--December 15, 1991

    SciTech Connect (OSTI)

    Shiomoto, G.H.; Smith, R.A.

    1992-03-01

    The DOE sponsored Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System program, which is a Clean Coal Technology Ill demonstration, is being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, which is a 100 MWe, down-fired utility boiler burning a low sulfur western coal. The project goal is to demonstrate 70 percent reductions in NO{sub x} and S0{sub 2} emissions through the integration of: (1) down-fired low-NO{sub x} burners with overfire air; (2) urea injection for additional NO{sub x} removal; and (3) dry sorbent injection and duct humidification for SO{sub 2} removal. The effectiveness of the integrated system on a high sulfur coal will also be tested. This report documents the first baseline test results conducted during the program. The baseline tests were conducted with the original burners and auxiliary equipment and represent the unmodified boiler emissions. The burner design of Arapahoe Unit 4 results in relatively high NO{sub x} levels ranging from 740 to 850 ppM (corrected to 3% O{sub 2}, dry) over the load range. Excess air level was the primary factor influencing NO{sub x} emissions. During normal boiler operations, there was a wide range in NO{sub x} emissions, due to the variations of excess air, boiler load and other, secondary parameters. SO{sub 2} emissions ranged from 350 to 600 ppM (corrected to 3% O{sub 2}, dry) and reflected variations in the coal sulfur content.

  16. NEPA and CEQA: Integrating State and Federal Environmental Reviews (Final)

    Broader source: Energy.gov [DOE]

    CEQ and the California Governor’s Office of Planning and Research (OPR) have jointly prepared the handbook “NEPA and CEQA: Integrating Federal and State Environmental Reviews.” The handbook provides practitioners with an overview of NEPA and CEQA as well as suggestions for developing a single environmental review process that can meet the requirements of both statutes. The handbook also provides a framework for a Memorandum of Understanding (MOU) between two or more agencies entering into a joint NEPA/ CEQA review process, and addresses the California Energy Commission licensing process, which takes the place of the CEQA process for certain power plants

  17. Review of consolidated Edison`s integrated resource bidding program

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Baldick, R.; Milne, A.

    1993-07-01

    Competitive bidding has emerged as the dominant method for procuring new resources by US utilities. In New York, the Public Service Commission (NYPSC) ordered the state`s seven investor-owned utilities to develop bidding programs to acquire supply and DSM resource options. Utilities were allowed significant discretion in program design in order to encourage experimentation. Competitive bidding programs pose formidable policy, design, and management challenges for utilities and their regulators. Yet, there have been few detailed case studies of bidding programs, particularly of those utilities that take on the additional challenge of having supply and DSM resources compete head-to-head for a designated block of capacity. To address that need, the New York State Energy Research and Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the bidding programs of two utilities that tested the integrated ``all-sources`` approach. This study focuses primarily on Consolidated Edison Company of New York`s (Con Edison) bidding program; an earlier report discusses our review of Niagara Mohawk`s program (Goldman et al 1992). We reviewed relevant Commission decisions, utility filings and signed contracts, interviewed utility and regulatory staff, surveyed DSM bidders and a selected sample of DSM non-bidders, and analyzed the bid evaluation system used in ranking bids based on detailed scoring information on individual bids provided by Con Edison.

  18. Long-Baseline Neutrino Experiment (LBNE)Water Cherenkov Detector Basis of Estimate Forms and Backup Documentation LBNE Far Site Internal Review (December 6-9, 2011)

    SciTech Connect (OSTI)

    Stewart J.; Diwan, M.; Dolph, J.; Novakova, P.; Sharma, R.; Stewart, J.; Viren, B.; Russo, T.; Kaducak, M.; Mantsch, P.; Paulos, B.; Feyzi, F.; Sullivan, G.; Bionta, R.; Fowler, J.; Warner, D.; Bahowick, S.; Van Berg, R.; Kearns, E.; Hazen, E.; Sinnis, G.; Sanchez, M.

    2011-12-09

    Basis of Estimate (BOE) forms and backup documentation developed for the Water Cherenkov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  19. Long-Baseline Neutrino Experiment (LBNE) Water Cherenkov Detector Schedule and Cost Books LBNE Far Site Internal Review(December 6-9,2011)

    SciTech Connect (OSTI)

    Stewart J.; Diwan, M.; Dolph, J.; Novakova, P.; Sharma, R.; Stewart, J.; Viren, B.; Russo, T.; Kaducak, M.; Mantsch, P.; Paulos, B.; Feyzi, F.; Sullivan, G.; Bionta, R.; Fowler, J.; Warner, D.; Bahowick, S.; Van Berg, R.; Kearns, E.; Hazen, E.; Sinnis, G.; Sanchez, M.

    2011-12-09

    Schedule and Cost Books developed for the Water Cherenkov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  20. CyberGIS software: a synthetic review and integration roadmap

    SciTech Connect (OSTI)

    Wang, Shaowen; Anselin, Luc; Bhaduri, Budhendra L; Cosby, Christopher; Goodchild, Michael; Liu, Yan; Nygers, Timothy L.

    2013-01-01

    CyberGIS defined as cyberinfrastructure-based geographic information systems (GIS) has emerged as a new generation of GIS representing an important research direction for both cyberinfrastructure and geographic information science. This study introduces a 5-year effort funded by the US National Science Foundation to advance the science and applications of CyberGIS, particularly for enabling the analysis of big spatial data, computationally intensive spatial analysis and modeling (SAM), and collaborative geospatial problem-solving and decision-making, simultaneously conducted by a large number of users. Several fundamental research questions are raised and addressed while a set of CyberGIS challenges and opportunities are identified from scientific perspectives. The study reviews several key CyberGIS software tools that are used to elucidate a vision and roadmap for CyberGIS software research. The roadmap focuses on software integration and synthesis of cyberinfrastructure, GIS, and SAM by defining several key integration dimensions and strategies. CyberGIS, based on this holistic integration roadmap, exhibits the following key characteristics: high-performance and scalable, open and distributed, collaborative, service-oriented, user-centric, and community-driven. As a major result of the roadmap, two key CyberGIS modalities gateway and toolkit combined with a community-driven and participatory approach have laid a solid foundation to achieve scientific breakthroughs across many geospatial communities that would be otherwise impossible.

  1. Review of integrated resource bidding at Niagara Mohawk

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Stoft, S.S.; Cohen, S.

    1992-05-01

    In June 1988, the New York Public Service Commission (PSC) ordered the state's investor-owned utilities to develop competitive bidding programs that included both supply and demandside resource options. The New York State Energy Research Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy's Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the integrated bidding processes of two New York utilities, Niagara Mohawk and Consolidated Edison. This interim report focuses on Niagara Mohawk (NMPC). In terms of overall approach, our analysis is intended as a critical review of a large-scale experiment in competitive resource acquisition implemented by New York utilities at the direction of their state regulators. The study is not a formal impact or process evaluation. Based on priorities established jointly with project sponsors, the report focuses on selected topics: analysis of the two-stage scoring system used by NMPC, ways that the scoring system can be improved, an in-depth review of the DSM bidding component of the solicitation including surveys of DSM bidders, relationship between DSM bidding and other utility-sponsored DSM programs, and major policy issues that arise in the design and implementation of competitive resource procurements. The major findings of this report are: NMPC's solicitation elicited an impressive response from private power developers and energy service companies. In the initial ranking of bids, DSM projects were awarded significantly more points on price and environmental factors compared to supply-side bids. NMPC's scoring system gave approximately twice as much weight nominally to price as to non-price factors (850 vs. 460 points).

  2. Review of integrated resource bidding at Niagara Mohawk

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Stoft, S.S.; Cohen, S.

    1992-05-01

    In June 1988, the New York Public Service Commission (PSC) ordered the state`s investor-owned utilities to develop competitive bidding programs that included both supply and demandside resource options. The New York State Energy Research & Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the integrated bidding processes of two New York utilities, Niagara Mohawk and Consolidated Edison. This interim report focuses on Niagara Mohawk (NMPC). In terms of overall approach, our analysis is intended as a critical review of a large-scale experiment in competitive resource acquisition implemented by New York utilities at the direction of their state regulators. The study is not a formal impact or process evaluation. Based on priorities established jointly with project sponsors, the report focuses on selected topics: analysis of the two-stage scoring system used by NMPC, ways that the scoring system can be improved, an in-depth review of the DSM bidding component of the solicitation including surveys of DSM bidders, relationship between DSM bidding and other utility-sponsored DSM programs, and major policy issues that arise in the design and implementation of competitive resource procurements. The major findings of this report are: NMPC`s solicitation elicited an impressive response from private power developers and energy service companies. In the initial ranking of bids, DSM projects were awarded significantly more points on price and environmental factors compared to supply-side bids. NMPC`s scoring system gave approximately twice as much weight nominally to price as to non-price factors (850 vs. 460 points).

  3. Advanced Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Pump 2013 Peer Review Advanced Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review PDF icon Advanced Variable Speed Integrated Heat Pump - 2013 Peer Review Presentation More Documents & Publications Advanced variable-speed Air Source Integrated Heat Pump prototype system and field test site near Knoxville, TN Credit: Oak Ridge National Lab Advanced Variable Speed

  4. NASA technical baseline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Twitter Google + Vimeo GovDelivery SlideShare SunShot Grand Challenge: Regional Test Centers NASA technical baseline HomeTag:NASA technical baseline Curiosity's multi-mission ...

  5. Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review PDF icon emrgtech06_reedy_040213.pdf More Documents & Publications Working Fluids Low Global Warming Potential Refrigerants - 2013 Peer Review Multi-Function Fuel-Fired Heat Pump - 2013 Peer Review Buildings Performance

  6. Vehicle Technologies Office Merit Review 2015: Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

    Broader source: Energy.gov [DOE]

    Presentation given by Eaton at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about integrated boosting and hybridization...

  7. NEPA and CEQA: Integrating State and Federal Environmental Reviews...

    Office of Environmental Management (EM)

    Reviews (Final) CEQ and the California Governor's Office of Planning and ... CEQA review process, and addresses the California Energy Commission licensing process, ...

  8. Hazard Baseline Documentation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-12-04

    This standard establishes uniform Office of Environmental Management (EM) guidance on hazard baseline documents that identify and control radiological and non-radiological hazards for all EM facilities.

  9. Physical Infrastructure Integration for Trinity, ASC L2 Milestone Review

    SciTech Connect (OSTI)

    Sena, Phillip A.

    2015-09-11

    Design, build, and integrate under-floor electrical and water-cooling distribution system for Trinity/ATS-1 platform.

  10. 2011 Biomass Program Platform Peer Review: Integrated Biorefineries

    Energy Savers [EERE]

    Plaform Peer Review: Analysis 2011 Biomass Program Plaform Peer Review: Analysis This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Biomass Program's Analysis Platform Review meeting, held on April 4, 2011, at the Doubletree Hotel in Annapolis, Maryland. PDF icon 2011_analysis_review.pdf More Documents & Publications 2011 Biomass Program Platform

  11. NREL: Technology Transfer - NREL and Partners Review Integration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integration Studies, Show Wind and Solar Can Support Proposed EPA Goal of 30% Carbon Dioxide Emissions Reduction June 15, 2015 The proposed Environmental Protection Agency (EPA)...

  12. 2011 Biomass Program Platform Peer Review: Integrated Biorefineries...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy Biomass Programs Integrated ...

  13. Vehicle Technologies Office Merit Review 2015: PEV / Grid Integration Study

    Broader source: Energy.gov [DOE]

    Presentation given by Pacific Northwest National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about PEV /...

  14. 2011 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Merit review of DOE Vehicle Technologies research activities PDF icon 2011amr08.pdf More Documents & Publications Penn State DOE Graduate Automotive Technology Education (Gate) ...

  15. Vehicle Technologies Office Merit Review 2015: Electric Vehicle Grid Integration

    Broader source: Energy.gov [DOE]

    Presentation given by National Renewable Energy Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about electric...

  16. 2014 WIND POWER PROGRAM PEER REVIEW-ADVANCED GRID INTEGRATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... o 8,000 generation units - Conduct statistical analyses to characterize the ... Technical Review Committee - Wind Statistical Analysis Wind data fix - Database ...

  17. Vehicle Technologies Office Merit Review 2014: PEV Integration with Renewables

    Broader source: Energy.gov [DOE]

    Presentation given by National Renewable Energy Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about PEV...

  18. Vehicle Technologies Office Merit Review 2015: Enabling High-Energy/Voltage Lithium-Ion Cells for Transportation Applications: Part 1 Baseline Protocols and Analysis

    Broader source: Energy.gov [DOE]

    Presentation given by Argonne National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about enabling high...

  19. Idaho National Laboratory Integrated Safety Management System 2010 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Thomas J. Haney

    2010-12-01

    Idaho National Laboratory completes an annual Integrated Safety Management System effectiveness review per 48 CFR 970.5223-1 “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assesses ISMS effectiveness, provides feedback to maintain system integrity, and helps identify target areas for focused improvements and assessments for the following year. Using one of the three Department of Energy (DOE) descriptors in DOE M 450.4-1 regarding the state of ISMS effectiveness during Fiscal Year (FY) 2010, the information presented in this review shows that INL achieved “Effective Performance.”

  20. Vehicle Technologies Office Merit Review 2014: Technology Integration Overview

    Broader source: Energy.gov [DOE]

    Presentation given by U.S. Department of Energy at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting providing an overview of...

  1. 2011 Biomass Program Platform Peer Review. Integrated Biorefineries

    SciTech Connect (OSTI)

    Rossmeissl, Neil

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Program’s IBR Platform Review meeting.

  2. Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System baseline SNCR test report, February 4--March 6, 1992

    SciTech Connect (OSTI)

    Smith, R.A.; Shiomoto, G.H.; Muzio, L.J.; Hunt, T.

    1993-09-01

    The DOE sponsored Integrated Dry NO{sub x}SO{sub 2} Emissions Control System program, which is a Clean Coal Technology III demonstration, is being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, which is a 100 MWe, down-fired utility boiler burning a low sulfur western coal. The project goal is to demonstrate 70 percent reductions in NO{sub x} and SO{sub 2} emissions through the integration of: (1) down-fired low-NO{sub x} burners with overfire air; (2) selective Non-Catalytic Reduction (SNCR) for additional NO{sub x} removal; and (3) dry sorbent injection and duct humidification for SO{sub 2} removal. The effectiveness of the integrated system on a high-sulfur coal will also be tested. This report documents the second test phase of the program. This second test phase was comprised of the start up of the SNCR system followed by a brief parametric test series. Time constraints due to the retrofit schedule precluded optimizing the SNCR system. Testing investigated both urea and aqueous ammonia as SNCR chemicals. Other parameters investigated included boiler load, the amount of chemical injected, as well as injection parameters (injection location, amount of mixing air, dilution water flow, and injector orifice sizes). NO{sub x} removals of nominally 35 percent could be obtained with both chemicals while maintaining ammonia slip levels less than 10 ppM at full load. At higher chemical injection rates (nominal N/NO molar ratios of 1.5 to 2.0), NO{sub x} reductions in the range of 60 to 70 percent were achieved, but with unacceptable levels of NH{sub 3} slip. For a given level of NO{sub x} reduction, ammonia slip was lower with aqueous ammonia injection than with urea. The test program also confirmed prior observations that (1) the optimum temperature for NO{sub x} reduction with ammonia is lower than with urea, and (2) N{sub 2}O emissions as a by-product of the SNCR process are lower for ammonia compared to urea.

  3. Integrated nonlinear photonics. Emerging applications and ongoing challenges - A mini review

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hendrickson, Scott M.; Foster, Amy C.; Camacho, Ryan M.; Clader, B. David

    2014-11-26

    In this paper, we provide a review of recent progress in integrated nonlinear photonics with a focus on emerging applications in all-optical signal processing, ultra-low-power all-optical switching, and quantum information processing.

  4. HEV America Baseline Test Sequence

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BASELINE TEST SEQUENCE Revision 1 September 1, 2006 Prepared by Electric Transportation ... All Rights Reserved HEV America Baseline Test Sequence Page 1 HEV PERFORMANCE TEST ...

  5. Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2011-12-01

    Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

  6. Transportation Baseline Report

    SciTech Connect (OSTI)

    Fawcett, Ricky Lee; Kramer, George Leroy Jr.

    1999-12-01

    The National Transportation Program 1999 Transportation Baseline Report presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste and materials transportation. In addition, this Report provides a summary overview of DOEs projected quantities of waste and materials for transportation. Data presented in this report were gathered as a part of the IPABS Spring 1999 update of the EM Corporate Database and are current as of July 30, 1999. These data were input and compiled using the Analysis and Visualization System (AVS) which is used to update all stream-level components of the EM Corporate Database, as well as TSD System and programmatic risk (disposition barrier) information. Project (PBS) and site-level IPABS data are being collected through the Interim Data Management System (IDMS). The data are presented in appendices to this report.

  7. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, Integration of Environment, Safety and Health into Work Planning and Execution. The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INLs ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is Effective.

  8. Annual Technology Baseline

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis. This primary product of the Annual Technology Baseline (ATB) project component includes detailed cost and performance data (both current and projected) for both renewable and conventional technologies. This data is presented in MS Excel.

  9. Pinellas Plant Environmental Baseline Report

    SciTech Connect (OSTI)

    Not Available

    1997-06-01

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  10. TWRS baseline system description

    SciTech Connect (OSTI)

    Lee, A.K.

    1995-03-28

    This document provides a description of the baseline system conceptualized for remediating the tank waste stored within the Hanford Site. Remediation of the tank waste will be performed by the Tank Waste Remediation System (TWRS). This baseline system description (BSD) document has been prepared to describe the current planning basis for the TWRS for accomplishing the tank waste remediation functions. The BSD document is not intended to prescribe firm program management strategies for implementing the TWRS. The scope of the TWRS Program includes managing existing facilities, developing technology for new systems; building, testing and operating new facilities; and maintaining the system. The TWRS Program will manage the system used for receiving, safely storing, maintaining, treating, and disposing onsite, or packaging for offsite disposal, all tank waste. The scope of the TWRS Program encompasses existing facilities such as waste storage tanks, evaporators, pipelines, and low-level radioactive waste treatment and disposal facilities. It includes support facilities that comprise the total TWRS infrastructure, including upgrades to existing facilities or equipment and the addition of new facilities.

  11. 241-AW Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Gunter, Jason R.; Reeploeg, Gretchen E.

    2013-11-19

    This report provides the results of an extent of condition construction history review for the 241-AW tank farm. The construction history of the 241-AW tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AW tank farm, the fourth double-shell tank farm constructed, similar issues as those with tank 241-AY-102 construction occured. The overall extent of similary and affect on 241-AW tank farm integrity is described herein.

  12. 241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Gunter, Jason R.

    2013-08-26

    This report provides the results of an extent of condition construction history review for tank 241-AY-101. The construction history of tank 241-AY-101 has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In tank 241-AY-101, the second double-shell tank constructed, similar issues as those with tank 241-AY-102 construction reoccurred. The overall extent of similary and affect on tank 241-AY-101 integrity is described herein.

  13. Vehicle Technologies Office Merit Review 2014: Integrated Computational Materials Engineering Approach to Development of Lightweight 3GAHSS Vehicle Assembly

    Broader source: Energy.gov [DOE]

    Presentation given by USAMP at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about integrated computational materials...

  14. Vehicle Technologies Office Merit Review 2015: Integrated Computational Materials Engineering Approach to Development of Lightweight 3GAHSS Vehicle Assembly

    Broader source: Energy.gov [DOE]

    Presentation given by USAMP at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about integrated computational materials...

  15. Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

    Office of Environmental Management (EM)

    Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background

  16. Baseline Test Specimen Machining Report

    SciTech Connect (OSTI)

    mark Carroll

    2009-08-01

    The Next Generation Nuclear Plant (NGNP) Project is tasked with selecting a high temperature gas reactor technology that will be capable of generating electricity and supplying large amounts of process heat. The NGNP is presently being designed as a helium-cooled high temperature gas reactor (HTGR) with a large graphite core. The graphite baseline characterization project is conducting the research and development (R&D) activities deemed necessary to fully qualify nuclear-grade graphite for use in the NGNP reactor. Establishing nonirradiated thermomechanical and thermophysical properties by characterizing lot-to-lot and billet-to-billet variations (for probabilistic baseline data needs) through extensive data collection and statistical analysis is one of the major fundamental objectives of the project. The reactor core will be made up of stacks of graphite moderator blocks. In order to gain a more comprehensive understanding of the varying characteristics in a wide range of suitable graphites, any of which can be classified as nuclear grade, an experimental program has been initiated to develop an extensive database of the baseline characteristics of numerous candidate graphites. Various factors known to affect the properties of graphite will be investigated, including specimen size, spatial location within a graphite billet, specimen orientation within a billet (either parallel to [P] or transverse to [T] the long axis of the as-produced billet), and billet-to-billet variations within a lot or across different production lots. Because each data point is based on a certain position within a given billet of graphite, particular attention must be paid to the traceability of each specimen and its spatial location and orientation within each billet. The evaluation of these properties is discussed in the Graphite Technology Development Plan (Windes et. al, 2007). One of the key components in the evaluation of these graphite types will be mechanical testing on specimens drawn from carefully controlled sections of each billet. To this end, this report will discuss the machining of the first set of test specimens that will be evaluated in this program through tensile, compressive, and flexural testing. Validation that the test specimens have been produced to the tolerances required by the applicable ASTM standards, and to the quality control levels required by this program, will demonstrate the viability of sending graphite to selected suppliers that will provide valuable and certifiable data to future data sets that are integral to the NGNP program and beyond.

  17. NREL: Energy Analysis - Annual Technology Baseline and Standard Scenarios

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Technology Baseline and Standard Scenarios Discussion Draft of NREL 2016 Annual Technology Baseline Now Available for Review NREL has posted a discussion draft of its 2016 Annual Technology Baseline (ATB) for public comment through April 15, 2016. ATB Spreadsheet ATB Presentation-an appendix summarizes significant changes from the 2015 ATB. Written public comments are welcome and must adhere to these criteria to be considered: Comments must be submitted in writing to

  18. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  19. 241-AZ Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Boomer, Kayle D.; Gunter, Jason R.; Venetz, Theodore J.

    2013-07-30

    This report provides the results of an extent of condition construction history review for tanks 241-AZ-101 and 241-AZ-102. The construction history of the 241-AZ tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AZ tank farm, the second DST farm constructed, both refractory quality and tank and liner fabrication were improved.

  20. 241-SY Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Boomer, Kayle D.; Gunter, Jason R.; Venetz, Theodore J.

    2013-07-25

    This report provides the results of an extent of condition construction history review for tanks 241-SY-101, 241-SY-102, and 241-SY-103. The construction history of the 241-SY tank farm has been reviewed to identify issues similar to those experienced during tank 241-AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank 241-AY-102 as the comparison benchmark. In the 241-SY tank farm, the third DST farm constructed, refractory quality and stress relief were improved, while similar tank and liner fabrication issues remained.

  1. 241-AP Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Gunter, Jason R.; Reeploeg, Gretchen E.

    2014-04-04

    This report provides the results of an extent of condition construction history review for the 241-AP tank farm. The construction history of the 241-AP tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AP tank farm, the sixth double-shell tank farm constructed, tank bottom flatness, refractory material quality, post-weld stress relieving, and primary tank bottom weld rejection were improved.

  2. Baseline Control Measures.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J....

  3. Energy Intensity Baselining and Tracking Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance Better Plants Energy Intensity Baselining and Tracking Guidance Energy Intensity Baselining and Tracking Guidance The Energy Intensity Baselining and ...

  4. Hanford Site technical baseline database

    SciTech Connect (OSTI)

    Porter, P.E., Westinghouse Hanford

    1996-05-10

    This document includes a cassette tape that contains the Hanford specific files that make up the Hanford Site Technical Baseline Database as of May 10, 1996. The cassette tape also includes the delta files that delineate the differences between this revision and revision 3 (April 10, 1996) of the Hanford Site Technical Baseline Database.

  5. Standard Review Plan Overview

    Office of Environmental Management (EM)

    ... on Alternative Approval on Performance Baseline Approval on Start of Construction ... Data Sheet, etc Perform a Performance Baseline Validation External Independent Review ...

  6. A proposed outline and review schedule for an integrated FS-EIS

    SciTech Connect (OSTI)

    Ambrose, R.; Cunningham, M.; Hanrahan, T. )

    1993-01-01

    Both CERCLA and NEPA have specific requirements for the information content, format, and review schedule of their respective Feasibility Study (FS) and Environmental Impact Statement (EIS) documents. The FS serves as the mechanism for the development, screening, and detailed evaluation of alternative remedial actions, while the EIS provides a discussion of significant environmental impacts and presents alternatives which would avoid or minimize adverse impacts or enhance the quality of the human environment. In some cases, the CERCLA and NEPA processes have been expressed as functionally equivalent'', and the need for NEPA questioned in instances where CERCLA compliance is required. This argument has been presented on the grounds that the CERCLA process addresses the information content needs of NEPA. However, in cases where EIS documents are required, specific information needs that are called for under NEPA are not typically addressed or readily fitted into the FS format (e.g. socioeconomic impacts). In addition, review schedules for an FS and an EIS differ; public comment opportunities and length of comment period differ. Where certain Federal agencies require that CERCLA and NEPA be integrated, there is often the guidance that NEPA be fitted into the CERCLA process. Using this guidance, an outline has been developed which integrates the information content needs of an FS and EIS, while maintaining, as closely as possible, the integrity of the FS format.

  7. Engineering task plan TWRS technical baseline completion

    SciTech Connect (OSTI)

    Moore, T.L

    1996-03-08

    The Tank Waste Remediation System (TWRS) includes many activities required to remediate the radioactive waste stored in underground waste storage tanks. These activities include routine monitoring of the waste, facilities maintenance, upgrades to existing equipment, and installation of new equipment necessary to manage, retrieve, process, and dispose of the waste. In order to ensure that these multiple activities are integrated, cost effective, and necessary, a sound technical baseline is required from which all activities can be traced and measured. The process by which this technical baseline is developed will consist of the identification of functions, requirements, architecture, and test (FRAT) methodology. This process must be completed for TWRS to a level that provides the technical basis for all facility/system/component maintenance, upgrades, or new equipment installation.

  8. 324 Building Baseline Radiological Characterization

    SciTech Connect (OSTI)

    R.J. Reeder, J.C. Cooper

    2010-06-24

    This report documents the analysis of radiological data collected as part of the characterization study performed in 1998. The study was performed to create a baseline of the radiological conditions in the 324 Building.

  9. MHD Technology Transfer, Integration and Review Committee. Second semiannual status report, July 1988--March 1989

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    As part of the MHD Integrated Topping Cycle (ITC) project, TRW was given the responsibility to organize, charter and co-chair, with the Department of Energy (DOE), an MHD Technology Transfer, Integration and Review Committee (TTIRC). The Charter of the TTIRC, which was approved by the DOE in June 1988 and distributed to the committee members, is included as part of this Summary. As stated in the Charter, the purpose of this committee is to: (1) review all Proof-of-Concept (POC) projects and schedules in the national MHD program; to assess their compatibility with each other and the first commercial MHD retrofit plant; (2) establish and implement technology transfer formats for users of this technology; (3) identify interfaces, issues, and funding structures directly impacting the success of the commercial retrofit; (4) investigate and identify the manner in which, and by whom, the above should be resolved; and (5) investigate and assess other participation (foreign and domestic) in the US MHD Program. The DOE fiscal year 1989 MHD Program Plan Schedule is included at the end of this Summary. The MHD Technology Transfer, Integration and Review Committee`s activities to date have focused primarily on the ``technology transfer`` aspects of its charter. It has provided a forum for the dissemination of technical and programmatic information among workers in the field of MHD and to the potential end users, the utilities, by holding semi-annual meetings. The committee publishes this semi-annual report, which presents in Sections 2 through 11 capsule summaries of technical progress for all DOE Proof-of-Concept MHD contracts and major test facilities.

  10. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

  11. Development and Testing of an Integrated Sandia Cooler Thermoelectric Device (SCTD).

    SciTech Connect (OSTI)

    Johnson, Terry A.; Staats, Wayne Lawrence,; Leick, Michael Thomas; Zimmerman, Mark D.; Radermacher, Reinhard; Martin, Cara; Nasuta, Dennis; Kalinowski, Paul; Hoffman, William

    2014-12-01

    This report describes a FY14 effort to develop an integrated Sandia Cooler T hermoelectric D evice (SCTD) . The project included a review of feasible thermoelectric (TE) cooling applications, baseline performance testing of an existing TE device, analysis and design development of an integrated SCTD assembly, and performance measurement and validation of the integrated SCTD prototype.

  12. The Integrated Safety Management System Verification Enhancement Review of the Plutonium Finishing Plant (PFP)

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    2000-02-09

    The primary purpose of the verification enhancement review was for the DOE Richland Operations Office (RL) to verify contractor readiness for the independent DOE Integrated Safety Management System Verification (ISMSV) on the Plutonium Finishing Plant (PFP). Secondary objectives included: (1) to reinforce the engagement of management and to gauge management commitment and accountability; (2) to evaluate the ''value added'' benefit of direct public involvement; (3) to evaluate the ''value added'' benefit of direct worker involvement; (4) to evaluate the ''value added'' benefit of the panel-to-panel review approach; and, (5) to evaluate the utility of the review's methodology/adaptability to periodic assessments of ISM status. The review was conducted on December 6-8, 1999, and involved the conduct of two-hour interviews with five separate panels of individuals with various management and operations responsibilities related to PFP. A semi-structured interview process was employed by a team of five ''reviewers'' who directed open-ended questions to the panels which focused on: (1) evidence of management commitment, accountability, and involvement; and, (2) consideration and demonstration of stakeholder (including worker) information and involvement opportunities. The purpose of a panel-to-panel dialogue approach was to better spotlight: (1) areas of mutual reinforcement and alignment that could serve as good examples of the management commitment and accountability aspects of ISMS implementation, and, (2) areas of potential discrepancy that could provide opportunities for improvement. In summary, the Review Team found major strengths to include: (1) the use of multi-disciplinary project work teams to plan and do work; (2) the availability and broad usage of multiple tools to help with planning and integrating work; (3) senior management presence and accessibility; (4) the institutionalization of worker involvement; (5) encouragement of self-reporting and self-assessment by management; (6) the availability of multiple internal communication mechanisms; and, (7) the existence of overall facility-wide safety management goals as well as individualized project work team goals. Major opportunities for improvement identified include: (1) the enhancement of external communications relative to ISM; (2) the institutionalization of ISM-related performance agreements/incentives; (3) the strengthening of feedback loops; (4) fine-tuning the use of tools; and, (5) the formalization of good practices.

  13. Quality Assurance for Critical Decision Reviews RM

    Office of Environmental Management (EM)

    ... Approval of Performance Baseline The review area focuses on the QA adequacy of the project documents and activities needed for CD-2 approval of Performance Baseline. The review ...

  14. Annual Technology Baseline (Including Supporting Data); NREL...

    Office of Scientific and Technical Information (OSTI)

    Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory) Citation Details In-Document Search Title: Annual Technology Baseline ...

  15. Baseline Wind Energy Facility | Open Energy Information

    Open Energy Info (EERE)

    Wind Energy Facility Jump to: navigation, search Name Baseline Wind Energy Facility Facility Baseline Wind Energy Facility Sector Wind energy Facility Type Commercial Scale Wind...

  16. Vehicle Technologies Office Merit Review 2015: Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE)

    Broader source: Energy.gov [DOE]

    Presentation given by National Renewable Energy Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

  17. Proceedings of the 24th Seismic Research Review: Nuclear Explosion Monitoring: Innovation and Integration

    SciTech Connect (OSTI)

    Warren, N. Jill

    2002-09-17

    These proceedings contain papers prepared for the 24th Seismic Research Review: Nuclear Explosion Monitoring: Innovation and Integration, held 17-19 September, 2002 in Ponte Vedra Beach, Florida. These papers represent the combined research related to ground-based nuclear explosion monitoring funded by the National Nuclear Security Administration (NNSA), Defense Threat Reduction Agency (DTRA), and other invited sponsors. The scientific objectives of the research are to improve the United States capability to detect, locate, and identify nuclear explosions. The purpose of the meeting is to provide the sponsoring agencies, as well as potential users, an opportunity to review research accomplished during the preceding year and to discuss areas of investigation for the coming year. For the researchers, it provides a forum for the exchange of scientific information toward achieving program goals, and an opportunity to discuss results and future plans. Paper topics include: seismic regionalization and calibration; detection and location of sources; wave propagation from source to receiver; the nature of seismic sources, including mining practices; hydroacoustic, infrasound, and radionuclide methods; on-site inspection; and data processing.

  18. Baseline Control Measures.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J. Intended for: Public Purpose: This poster was prepared for the June 2013 Individual Permit for Storm Water (IP) public meeting. The purpose of the meeting was to update the public on implementation of the permit as required under Part 1.I (7) of the IP (National Pollutant Discharge Elimination System Permit No.

  19. A Review of Barriers to and Opportunities for the Integration of Renewable Energy in the Southeast

    SciTech Connect (OSTI)

    McConnell, Ben W; Hadley, Stanton W; Xu, Yan

    2011-08-01

    The objectives of this study were to prepare a summary report that examines the opportunities for and obstacles to the integration of renewable energy resources in the Southeast between now and the year 2030. The report, which is based on a review of existing literature regarding renewable resources in the Southeast, includes the following renewable energy resources: wind, solar, hydro, geothermal, biomass, and tidal. The evaluation was conducted by the Oak Ridge National Laboratory for the Energy Foundation and is a subjective review with limited detailed analysis. However, the report offers a best estimate of the magnitude, time frame, and cost of deployment of renewable resources in the Southeast based upon the literature reviewed and reasonable engineering and economic estimates. For the purposes of this report, the Southeast is defined as the states of Alabama, Arkansas, Florida, Georgia, Kentucky, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, Virginia, and West Virginia. In addition, some aspects of the report (wind and geothermal) also consider the extended Southeast, which includes Maryland, Missouri, Oklahoma, and Texas. A description of the existing base of renewable electricity installations in the region is given for each technology considered. Where available, the possible barriers and other considerations regarding renewable energy resources are listed in terms of availability, investment and maintenance costs, reliability, installation requirements, policies, and energy market. As stated above, the report is a comprehensive review of renewable energy resources in the southeastern region of United States based on a literature study that included information obtained from the Southern Bio-Power wiki, sources from the Energy Foundation, sources available to ORNL, and sources found during the review. The report consists of an executive summary, this introductory chapter describing report objectives, a chapter on analysis methods and the status of renewable resources, chapters devoted to each identified renewable resource, and a brief summary chapter. Chapter 2 on analysis methods and status summarizes the benefits of integrating renewable energy resources in the Southeast. The utilization of the existing fuels, both the fossil fuels and the renewable energy resources, is evaluated. The financial rewards of renewable resources are listed, which includes the amount of fuel imported from outside the Southeast to find the net benefit of local renewable generation, and both the typical and new green job opportunities that arise from renewable generation in the Southeast. With the load growth in the Southeast, the growth of transmission and fossil fuel generation may not meet the growing demands for energy. The load growth is estimated, and the benefits of renewable resources for solving local growing energy demands are evaluated. Chapters 3-7 discuss the key renewable energy resources in the Southeast. Six resources available in this region that are discussed are (1) wind, including both onshore and offshore; (2) solar, including passive, photovoltaic, and concentrating; (3) biomass energy, including switchgrass, biomass co-firing, wood, woody biomass, wood industry by-products (harvesting residues, mill waste, etc.), agricultural byproducts, landfill gas to energy and anaerobic digester gas; (4) hydro; and (5) geothermal. Because of limited development, ocean wave and tidal were not considered to be available in significant quantity before 2030 and are not presented in the final analysis. Estimates on the location of potential megawatt generation from these renewable resources in the Southeast are made. Each chapter will describe the existing base of the renewable electricity installations in the region now and, when available, the base of the existing manufacturing capacity in the region for renewable energy resources hardware and software. The possible barriers and considerations for renewable energy resources are presented.

  20. Baseline tests for arc melter vitrification of INEL buried wastes. Volume 1: Facility description and summary data report

    SciTech Connect (OSTI)

    Oden, L.L.; O`Connor, W.K.; Turner, P.C.; Soelberg, N.R.; Anderson, G.L.

    1993-11-19

    This report presents field results and raw data from the Buried Waste Integrated Demonstration (BWID) Arc Melter Vitrification Project Phase 1 baseline test series conducted by the Idaho National Engineering Laboratory (INEL) in cooperation with the U.S. Bureau of Mines (USBM). The baseline test series was conducted using the electric arc melter facility at the USBM Albany Research Center in Albany, Oregon. Five different surrogate waste feed mixtures were tested that simulated thermally-oxidized, buried, TRU-contaminated, mixed wastes and soils present at the INEL. The USBM Arc Furnace Integrated Waste Processing Test Facility includes a continuous feed system, the arc melting furnace, an offgas control system, and utilities. The melter is a sealed, 3-phase alternating current (ac) furnace approximately 2 m high and 1.3 m wide. The furnace has a capacity of 1 metric ton of steel and can process as much as 1,500 lb/h of soil-type waste materials. The surrogate feed materials included five mixtures designed to simulate incinerated TRU-contaminated buried waste materials mixed with INEL soil. Process samples, melter system operations data and offgas composition data were obtained during the baseline tests to evaluate the melter performance and meet test objectives. Samples and data gathered during this program included (a) automatically and manually logged melter systems operations data, (b) process samples of slag, metal and fume solids, and (c) offgas composition, temperature, velocity, flowrate, moisture content, particulate loading and metals content. This report consists of 2 volumes: Volume I summarizes the baseline test operations. It includes an executive summary, system and facility description, review of the surrogate waste mixtures, and a description of the baseline test activities, measurements, and sample collection. Volume II contains the raw test data and sample analyses from samples collected during the baseline tests.

  1. MHD Technology Transfer, Integration and Review Committee. Seventh semi-annual status report, April 1991--September 1991

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This seventh semi-annual status report of the MHD Technology Transfer, Integration and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1991 through September 1991. It includes a summary and minutes of the General Committee meeting, progress summaries of ongoing POC contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months. The meeting included test plan with Western coal, seed regeneration economics, power management for the integrated topping cycle and status of the Clean Coal Technology Proposal activities. Appendices cover CDIF operations HRSR development, CFFF operations etc.

  2. Baseline LAW Glass Formulation Testing

    SciTech Connect (OSTI)

    Kruger, Albert A.; Mooers, Cavin; Bazemore, Gina; Pegg, Ian L.; Hight, Kenneth; Lai, Shan Tao; Buechele, Andrew; Rielley, Elizabeth; Gan, Hao; Muller, Isabelle S.; Cecil, Richard

    2013-06-13

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  3. Global Nuclear Energy Partnership Waste Treatment Baseline

    SciTech Connect (OSTI)

    Dirk Gombert; William Ebert; James Marra; Robert Jubin; John Vienna

    2008-05-01

    The Global Nuclear Energy Partnership program (GNEP) is designed to demonstrate a proliferation-resistant and sustainable integrated nuclear fuel cycle that can be commercialized and used internationally. Alternative stabilization concepts for byproducts and waste streams generated by fuel recycling processes were evaluated and a baseline of waste forms was recommended for the safe disposition of waste streams. Waste forms are recommended based on the demonstrated or expected commercial practicability and technical maturity of the processes needed to make the waste forms, and performance of the waste form materials when disposed. Significant issues remain in developing technologies to process some of the wastes into the recommended waste forms, and a detailed analysis of technology readiness and availability may lead to the choice of a different waste form than what is recommended herein. Evolving regulations could also affect the selection of waste forms.

  4. FED baseline engineering studies report

    SciTech Connect (OSTI)

    Sager, P.H.

    1983-04-01

    Studies were carried out on the FED Baseline to improve design definition, establish feasibility, and reduce cost. Emphasis was placed on cost reduction, but significant feasibility concerns existed in several areas, and better design definition was required to establish feasibility and provide a better basis for cost estimates. Design definition and feasibility studies included the development of a labyrinth shield ring concept to prevent radiation streaming between the torus spool and the TF coil cryostat. The labyrinth shield concept which was developed reduced radiation streaming sufficiently to permit contact maintenance of the inboard EF coils. Various concepts of preventing arcing between adjacent shield sectors were also explored. It was concluded that installation of copper straps with molybdenum thermal radiation shields would provide the most reliable means of preventing arcing. Other design studies included torus spool electrical/structural concepts, test module shielding, torus seismic response, poloidal conditions in the magnets, disruption characteristics, and eddy current effects. These additional studies had no significant impact on cost but did confirm the feasibility of the basic FED Baseline concept.

  5. Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012

    Office of Environmental Management (EM)

    Contractor Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background

  6. Baseline Graphite Characterization: First Billet

    SciTech Connect (OSTI)

    Mark C. Carroll; Joe Lords; David Rohrbaugh

    2010-09-01

    The Next Generation Nuclear Plant Project Graphite Research and Development program is currently establishing the safe operating envelope of graphite core components for a very high temperature reactor design. To meet this goal, the program is generating the extensive amount of quantitative data necessary for predicting the behavior and operating performance of the available nuclear graphite grades. In order determine the in-service behavior of the graphite for the latest proposed designs, two main programs are underway. The first, the Advanced Graphite Creep (AGC) program, is a set of experiments that are designed to evaluate the irradiated properties and behavior of nuclear grade graphite over a large spectrum of temperatures, neutron fluences, and compressive loads. Despite the aggressive experimental matrix that comprises the set of AGC test runs, a limited amount of data can be generated based upon the availability of space within the Advanced Test Reactor and the geometric constraints placed on the AGC specimens that will be inserted. In order to supplement the AGC data set, the Baseline Graphite Characterization program will endeavor to provide supplemental data that will characterize the inherent property variability in nuclear-grade graphite without the testing constraints of the AGC program. This variability in properties is a natural artifact of graphite due to the geologic raw materials that are utilized in its production. This variability will be quantified not only within a single billet of as-produced graphite, but also from billets within a single lot, billets from different lots of the same grade, and across different billets of the numerous grades of nuclear graphite that are presently available. The thorough understanding of this variability will provide added detail to the irradiated property data, and provide a more thorough understanding of the behavior of graphite that will be used in reactor design and licensing. This report covers the development of the Baseline Graphite Characterization program from a testing and data collection standpoint through the completion of characterization on the first billet of nuclear-grade graphite. This data set is the starting point for all future evaluations and comparisons of material properties.

  7. Review and Status of Wind Integration and Transmission in the United States: Key Issues and Lessons Learned

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Review and Status of Wind Integration and Transmission in the United States: Key Issues and Lessons Learned M. Milligan, 1 B. Kirby, 2 T. Acker, 3 M. Ahlstrom, 4 B. Frew, 1 M. Goggin, 5 W. Lasher, 6 M. Marquis, 7 and D. Osborn 8 1 National Renewable Energy Laboratory 2 Consult Kirby 3 Northern Arizona University 4 WindLogics 5 American Wind Energy Association 6 Electric Reliability Council of Texas 7 National Oceanic and Atmospheric Administration 8 Midcontinent Independent System Operator

  8. Multiproject baselines for evaluation of electric power projects

    SciTech Connect (OSTI)

    Sathaye, Jayant; Murtishaw, Scott; Price, Lynn; Lefranc, Maurice; Roy, Joyashree; Winkler, Harald; Spalding-Fecher, Randall

    2003-03-12

    Calculating greenhouse gas emissions reductions from climate change mitigation projects requires construction of a baseline that sets emissions levels that would have occurred without the project. This paper describes a standardized multiproject methodology for setting baselines, represented by the emissions rate (kg C/kWh), for electric power projects. A standardized methodology would reduce the transaction costs of projects. The most challenging aspect of setting multiproject emissions rates is determining the vintage and types of plants to include in the baseline and the stringency of the emissions rates to be considered, in order to balance the desire to encourage no- or low-carbon projects while maintaining environmental integrity. The criteria for selecting power plants to include in the baseline depend on characteristics of both the project and the electricity grid it serves. Two case studies illustrate the application of these concepts to the electric power grids in eastern India and South Africa. We use hypothetical, but realistic, climate change projects in each country to illustrate the use of the multiproject methodology, and note the further research required to fully understand the implications of the various choices in constructing and using these baselines.

  9. Vehicle Technologies Office Merit Review 2015: Applied Integrated Computational Materials Engineering (ICME) for New Propulsion Materials

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Applied...

  10. The mixed waste management facility. Project baseline revision 1.2

    SciTech Connect (OSTI)

    Streit, R.D.; Throop, A.L.

    1995-04-01

    Revision 1.2 to the Project Baseline (PB) for the Mixed Waste Management Facility (MWMF) is in response to DOE directives and verbal guidance to (1) Collocate the Decontamination and Waste Treatment Facility (DWTF) and MWMF into a single complex, integrate certain and overlapping functions as a cost-saving measure; (2) Meet certain fiscal year (FY) new-BA funding objectives ($15.3M in FY95) with lower and roughly balanced funding for out years; (3) Reduce Total Project Cost (TPC) for the MWMF Project; (4) Include costs for all appropriate permitting activities in the project TPC. This baseline revision also incorporates revisions in the technical baseline design for Molten Salt Oxidation (MSO) and Mediated Electrochemical Oxidation (MEO). Changes in the WBS dictionary that are necessary as a result of this rebaseline, as well as minor title changes, at WBS Level 3 or above (DOE control level) are approved as a separate document. For completeness, the WBS dictionary that reflects these changes is contained in Appendix B. The PB, with revisions as described in this document, were also the basis for the FY97 Validation Process, presented to DOE and their reviewers on March 21-22, 1995. Appendix C lists information related to prior revisions to the PB. Several key changes relate to the integration of functions and sharing of facilities between the portion of the DWTF that will house the MWMF and those portions that are used by the Hazardous Waste Management (HWM) Division at LLNL. This collocation has been directed by DOE as a cost-saving measure and has been implemented in a manner that maintains separate operational elements from a safety and permitting viewpoint. Appendix D provides background information on the decision and implications of collocating the two facilities.

  11. A review of OSHA PSM citations relating to mechanical integrity of process piping

    SciTech Connect (OSTI)

    Casada, M.L.; Remson, A.C.; Yerger, C.M. [JBF Associates, Inc., Knoxville, TN (United States)

    1996-07-01

    OSHA`s process safety management (PSM) regulation has been in effect for more than three years. The regulation poses challenges for facilities in documenting the integrity of process piping systems. This paper summarizes the results of a project sponsored by the Materials Technology Institute (MTI) to compile PSM enforcement information relating to mechanical integrity W and process safety information (PSI) relating to equipment. This paper provides an analysis of how OSHA is citing violations of the PSM regulation as it relates to process piping. This information should be helpful to engineers and maintenance personnel who need guidance on how to ``OSHA-proof`` their mechanical integrity compliance for process piping systems.

  12. NREL: Climate Neutral Research Campuses - Determine Baseline...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Determine Baseline Energy Consumption To create a climate action plan for your research campus, begin by determining current energy consumption and the resulting greenhouse gas ...

  13. Tank waste remediation systems technical baseline database

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-16

    This document includes a cassette tape that contains Hanford generated data for the Tank Waste Remediation Systems Technical Baseline Database as of October 09, 1996.

  14. Baselines for Greenhouse Gas Reductions: Problems, Precedents...

    Open Energy Info (EERE)

    Baseline projection, GHG inventory, Pathways analysis Resource Type: Publications, Lessons learnedbest practices Website: www.p2pays.orgref2221739.pdf References:...

  15. Handbook Issued on NEPA and CEQA: Integrating Federal and State Environmental Reviews

    Broader source: Energy.gov [DOE]

    The Council on Environmental Quality (CEQ) and the California Governor's Office of Planning and Research (OPR) jointly issued a new handbook, NEPA and CEQA: Integrating Federal and State...

  16. Vehicle Technologies Office Merit Review 2015: Overview of VTO Technology Integration Activities

    Broader source: Energy.gov [DOE]

    Presentation given by U.S. Department of Energy at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about overview of VTO...

  17. Vehicle Technologies Office Merit Review 2015: Traction Drive Systems with Integrated Wireless Charging

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about traction drive...

  18. Long-Baseline Neutrino Facility / Deep Underground Neutrino Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Baseline Neutrino Facility Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline Neutrino Facility Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline ...

  19. Renewable Diesel from Algal Lipis: An Integrated Baseline for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    commercial product, process, or ... with model-based quantitative metrics for cost, scale-up potential, and sustainability. ... on regulatory policy restrictions, the ...

  20. Wind energy and power system operations: a review of wind integration studies to date

    SciTech Connect (OSTI)

    Cesaro, Jennifer de; Porter, Kevin; Milligan, Michael

    2009-12-15

    Wind integration will not be accomplished successfully by doing ''more of the same.'' It will require significant changes in grid planning and operations, continued technical evolution in the design and operation of wind turbines, further adoption and implementation of wind forecasting in the control room, and incorporation of market and policy initiatives to encourage more flexible generation. (author)

  1. TWRS technical baseline database manager definition document

    SciTech Connect (OSTI)

    Acree, C.D.

    1997-08-13

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.

  2. Revised SRC-I project baseline. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    International Coal Refining Company (ICRC), in cooperation with the Commonwealth of Kentucky has contracted with the United States Department of Energy (DOE) to design, build and operate a first-of-its-kind plant demonstrating the economic, environmental, socioeconomic and technical feasibility of the direct coal liquefaction process known as SRC-I. ICRC has made a massive commitment of time and expertise to design processes, plan and formulate policy, schedules, costs and technical drawings for all plant systems. These fully integrated plans comprise the Project Baseline and are the basis for all future detailed engineering, plant construction, operation, and other work set forth in the contract between ICRC and the DOE. Volumes I and II of the accompanying documents constitute the updated Project Baseline for the SRC-I two-stage liquefaction plant. International Coal Refining Company believes this versatile plant design incorporates the most advanced coal liquefaction system available in the synthetic fuels field. SRC-I two-stage liquefaction, as developed by ICRC, is the way of the future in coal liquefaction because of its product slate flexibility, high process thermal efficiency, and low consumption of hydrogen. The SRC-I Project Baseline design also has made important state-of-the-art advances in areas such as environmental control systems. Because of a lack of funding, the DOE has curtailed the total project effort without specifying a definite renewal date. This precludes the development of revised accurate and meaningful schedules and, hence, escalated project costs. ICRC has revised and updated the original Design Baseline to include in the technical documentation all of the approved but previously non-incorporated Category B and C and new Post-Baseline Engineering Change Proposals.

  3. Hanford Site technical baseline database. Revision 1

    SciTech Connect (OSTI)

    Porter, P.E.

    1995-01-27

    This report lists the Hanford specific files (Table 1) that make up the Hanford Site Technical Baseline Database. Table 2 includes the delta files that delineate the differences between this revision and revision 0 of the Hanford Site Technical Baseline Database. This information is being managed and maintained on the Hanford RDD-100 System, which uses the capabilities of RDD-100, a systems engineering software system of Ascent Logic Corporation (ALC). This revision of the Hanford Site Technical Baseline Database uses RDD-100 version 3.0.2.2 (see Table 3). Directories reflect those controlled by the Hanford RDD-100 System Administrator. Table 4 provides information regarding the platform. A cassette tape containing the Hanford Site Technical Baseline Database is available.

  4. Residential Buildings Integration Program

    Broader source: Energy.gov [DOE]

    Residential Buildings Integration Program Presentation for the 2013 Building Technologies Office's Program Peer Review

  5. Summative Mass Closure: Laboratory Analytical Procedure (LAP) Review and Integration: Feedstocks; Issue Date: April 2010; Revision Date: July 2011 (Version 07-08-2011)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summative Mass Closure Laboratory Analytical Procedure (LAP) Review and Integration Issue Date: April 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A. Sluiter Technical Report NREL/TP-510-48087 Revised July 2011 Technical Report Summative Mass Closure NREL/TP-510-48087 Revised July 2011 Laboratory Analytical Procedure (LAP) Review and Integration Issue Date: April 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A. Sluiter Prepared under Task No. BB072230

  6. Waste management project technical baseline description

    SciTech Connect (OSTI)

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  7. Solid Waste Program technical baseline description

    SciTech Connect (OSTI)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  8. Mexico-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name Mexico-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  9. Indonesia-Danish Government Baseline Workstream | Open Energy...

    Open Energy Info (EERE)

    Indonesia-Danish Government Baseline Workstream Jump to: navigation, search Name Indonesia-Danish Government Baseline Workstream AgencyCompany Organization Danish Government...

  10. India-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name India-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  11. UNFCCC-Consolidated baseline and monitoring methodology for landfill...

    Open Energy Info (EERE)

    Consolidated baseline and monitoring methodology for landfill gas project activities Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNFCCC-Consolidated baseline and...

  12. China-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name China-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  13. EVMS Training Snippet: 4.6 Baseline Control Methods

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) discusses baseline revisions and the different baseline control vehicles used in DOE.

  14. South Africa-Danish Government Baseline Workstream | Open Energy...

    Open Energy Info (EERE)

    Baseline Workstream Jump to: navigation, search Name South Africa-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish Ministry for...

  15. EA-1943: Construction and Operation of the Long Baseline Neutrino...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    43: Construction and Operation of the Long Baseline Neutrino Facility and Deep Underground ... EA-1943: Construction and Operation of the Long Baseline Neutrino Facility and Deep ...

  16. Brazil-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name Brazil-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  17. Baseline Microstructural Characterization of Outer 3013 Containers

    SciTech Connect (OSTI)

    Zapp, Phillip E.; Dunn, Kerry A

    2005-07-31

    Three DOE Standard 3013 outer storage containers were examined to characterize the microstructure of the type 316L stainless steel material of construction. Two of the containers were closure-welded yielding production-quality outer 3013 containers; the third examined container was not closed. Optical metallography and Knoop microhardness measurements were performed to establish a baseline characterization that will support future destructive examinations of 3013 outer containers in the storage inventory. Metallography revealed the microstructural features typical of this austenitic stainless steel as it is formed and welded. The grains were equiaxed with evident annealing twins. Flow lines were prominent in the forming directions of the cylindrical body and flat lids and bottom caps. No adverse indications were seen. Microhardness values, although widely varying, were consistent with annealed austenitic stainless steel. The data gathered as part of this characterization will be used as a baseline for the destructive examination of 3013 containers removed from the storage inventory.

  18. Electrochemistry Diagnostics of Baseline and New Materials

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  19. Electrochemistry Diagnostics of Baseline and New Materials

    Broader source: Energy.gov [DOE]

    2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

  20. Electrochemistry Diagnostics of Baseline and New Materials

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  1. Document Number Q0029500 Baseline Risk Assessment Update 4.0 Baseline Risk Assessment Update

    Office of Legacy Management (LM)

    Baseline Risk Assessment Update 4.0 Baseline Risk Assessment Update This section updates the human health and the ecological risk assessments that were originally presented in the 1998 RI (DOE 1998a). The impacts on the 1998 risk assessments are summarized in Section 2.9. 4.1 Human Health Risk Assessment Several activities completed since 1998 have contributed to changes in surface water and ground water concentrations. Activities that have impacted, or likely impacted surface water and ground

  2. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, July--September 1993

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model. During the period of this report, a Topical Report summarizing the Baseline Case design was drafted and issued to DOE/PETC for review and release approval. Major effort was spent on the Alternate Upgrading and Refining Case. Its design specifications were finalized, and material and utility balances completed. Initial capital cost estimates were developed. A Topical Report, summarizing the Alternative (ZSM-5) Upgrading and Refining Case design, is being drafted. Under Task 4, some of the individual plant models were expanded and enhanced. An overall ASPEN/SP process simulation model was developed for the Baseline Design Case by combining the individual models of Areas 100, 200 and 300. In addition, a separate model for the simplified product refining area, Area 300, of the Alternate Upgrading and Refining case was developed. Under Task 7, cost and schedule control was the primary activity. A technical paper entitled ``Baseline Design/Economics for Advanced Fischer-Tropsch Technology`` was presented in the DOE/PETC`s Annual Contractors Review Conference, held at Pittsburgh, Pennsylvania, on September 27-29, 1993. A contract amendment was submitted to include the Kerr McGee ROSE unit in the Baseline design case and to convert the PFS models from the ASPEN/SP to ASPEN/Plus software code.

  3. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    SciTech Connect (OSTI)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-02-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

  4. Vehicle Technologies Office Merit Review 2014: Integrated Vehicle Thermal Management – Combining Fluid Loops in Electric Drive Vehicles

    Broader source: Energy.gov [DOE]

    Presentation given by National Renewable Energy Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

  5. Grocery 2009 TSD Miami Baseline | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Model Name Grocery 2009 TSD Miami Baseline Building Type Food Sales Model Type Baseline Model Target Type ASHRAE 90.1 2004 Model Year 2009 IDF file...

  6. Grocery 2009 TSD Chicago Baseline | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Model Name Grocery 2009 TSD Chicago Baseline Building Type Food Sales Model Type Baseline Model Target Type ASHRAE 90.1 2004 Model Year 2009 IDF file...

  7. Proposed Methodology for LEED Baseline Refrigeration Modeling (Presentation)

    SciTech Connect (OSTI)

    Deru, M.

    2011-02-01

    This PowerPoint presentation summarizes a proposed methodology for LEED baseline refrigeration modeling. The presentation discusses why refrigeration modeling is important, the inputs of energy models, resources, reference building model cases, baseline model highlights, example savings calculations and results.

  8. NREL: Energy Analysis - Annual Technology Baseline and Standard Scenarios

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legacy Versions Annual Technology Baseline and Standard Scenarios - Legacy Versions This section contains earlier versions of NREL's Annual Technology Baseline and Standard Scenarios products. Looking for the latest versions of the ATB? Spring 2015 Draft Versions Annual Technology Baseline (ATB) Spreadsheet ATB Summary Presentation Standard Scenarios Annual Report

  9. A SURVEY OF ASTRONOMICAL RESEARCH: A BASELINE FOR ASTRONOMICAL DEVELOPMENT

    SciTech Connect (OSTI)

    Ribeiro, V. A. R. M.; Russo, P.; Crdenas-Avendao, A. E-mail: russo@strw.leidenuniv.nl

    2013-12-01

    Measuring scientific development is a difficult task. Different metrics have been put forward to evaluate scientific development; in this paper we explore a metric that uses the number of peer-reviewed, and when available non-peer-reviewed, research articles as an indicator of development in the field of astronomy. We analyzed the available publication record, using the Smithsonian Astrophysical Observatory/NASA Astrophysics Database System, by country affiliation in the time span between 1950 and 2011 for countries with a gross national income of less than 14,365 USD in 2010. This represents 149 countries. We propose that this metric identifies countries in ''astronomical development'' with a culture of research publishing. We also propose that for a country to develop in astronomy, it should invest in outside expert visits, send its staff abroad to study, and establish a culture of scientific publishing. Furthermore, we propose that this paper may be used as a baseline to measure the success of major international projects, such as the International Year of Astronomy 2009.

  10. 2012 CERTS LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis

    Energy Savers [EERE]

    Integration and Extension of Direct Load Management of Smart Loads Anna Scaglione, UC Davis GRA: Mahnoosh Alizadeh Project objective  Invent methods to "store" load demand for * Real-time "generation following" * Integration of load reserves as dispatchable assets in the Energy Market  Architecture for virtual "reserves" (queues) of electrical load demand * Watts to Job mapping (analysis)  Captures digitally the service requirements - Equal service type =

  11. LTC vacuum blasting machine (concrete): Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The LTC shot blast technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC 1073 Vacuum Blasting Machine uses a high-capacity, direct-pressure blasting system which incorporates a continuous feed for the blast media. The blast media cleans the surface within the contained brush area of the blast. It incorporates a vacuum system which removes dust and debris from the surface as it is blasted. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure during maintenance activities was minimal, but due to mechanical difficulties dust monitoring could not be conducted during operation. Noise exposure was significant. Further testing for each of these exposures is recommended because of the outdoor environment where the testing demonstration took place. This may cause the results to be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed environment. In addition, other safety and health issues found were ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, and arm-hand vibration.

  12. LTC vacuum blasting machine (metal): Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  13. Pentek metal coating removal system: Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  14. Baseline air quality study at Fermilab

    SciTech Connect (OSTI)

    Dave, M.J.; Charboneau, R.

    1980-10-01

    Air quality and meteorological data collected at Fermi National Accelerator Laboratory are presented. The data represent baseline values for the pre-construction phase of a proposed coal-gasification test facility. Air quality data were characterized through continuous monitoring of gaseous pollutants, collection of meteorological data, data acquisition and reduction, and collection and analysis of discrete atmospheric samples. Seven air quality parameters were monitored and recorded on a continuous real-time basis: sulfur dioxide, ozone, total hydrocarbons, nonreactive hydrocarbons, nitric oxide, nitrogen oxides, and carbon monoxide. A 20.9-m tower was erected near Argonne's mobile air monitoring laboratory, which was located immediately downwind of the proposed facility. The tower was instrumented at three levels to collect continuous meteorological data. Wind speed was monitored at three levels; wind direction, horizontal and vertical, at the top level; ambient temperature at the top level; and differential temperature between all three levels. All continuously-monitored parameters were digitized and recorded on magnetic tape. Appropriate software was prepared to reduce the data. Statistical summaries, grphical displays, and correlation studies also are presented.

  15. Land Use Baseline Report Savannah River Site

    SciTech Connect (OSTI)

    Noah, J.C.

    1995-06-29

    This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

  16. CBEI: Collaborative Approaches for Integrated Energy Retrofits...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer Review CBEI: Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer Review Presenter: John ...

  17. Commercial Buildings Integration Program Overview - 2013 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 BTO Peer Review Commercial Buildings Integration Program Overview - 2013 BTO Peer Review Commercial Buildings Integration Program Presentation for the 2013 Building Technologies ...

  18. Long-Baseline Neutrino Facility / Deep Underground Neutrino Project

    Energy Savers [EERE]

    (LBNF-DUNE) | Department of Energy Long-Baseline Neutrino Facility / Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline Neutrino Facility / Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline Neutrino Facility / Deep Underground Neutrino Project (LBNF-DUNE) Chris Mossey, Deputy Lab Director (Fermi) and Project Director for LBNF-DUNE March 23, 2016 PDF icon Presentation More Documents & Publications EA-1943: Final Environmental Assessment EA-1943: Draft Environmental

  19. Mid-Atlantic Baseline Studies Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mid-Atlantic Baseline Studies Project Mid-Atlantic Baseline Studies Project Funded by the Department of Energy, along with a number of partners, the collaborative Mid-Atlantic Baseline Studies Project, led by the Biodiversity Research Institute (BRI), helps improve understanding of species composition and use of the Mid-Atlantic marine environment in order to promote more sustainable offshore wind development. This first-of-its-kind study along the Eastern Seaboard of the United States delivers

  20. Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template Template for briefing Baseline Change Proposals to the ESAAB and/or PMRC July 2015 Office presentation icon Template Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications DOE Project Management Risk Committee (PMRC) SOP Critical Decision 2 (CD-2) ESAAB and PMRC Brief Template External

  1. ATIC as a testbed for the ACCESS baseline calorimeter

    SciTech Connect (OSTI)

    Isbert, J.; Authement, J.; Coleman, J.; Guzik, T. G.; Granger, D.; Lockwood, R.; McMorris, A.; Mock, L.; Oubre, C.; Panasyuk, M.; Peck, J.; Wefel, J. P.; Adams, J. H. Jr.; Boberg, P. R.; Dion-Schwarz, C.; Kroeger, R.; Bashindzhagyan, G. B.; Khein, L.; Samsonov, G. A.; Zatsepin, V. I.

    1999-01-22

    The Advanced Thin Ionization Calorimeter (ATIC) balloon experiment is designed to measure the spectrum of individual elements from H through Fe up to a total energy >10{sup 14} eV. To accomplish this goal, ATIC incorporates a Silicon matrix detector composed of more than 4,000 pixels to measure the incident particle charge in the presence of backscatter background, three plastic scintillator hodoscopes to provide an event trigger as well as a backup measurement of the particle charge and trajectory, a 3/4 interaction length carbon target and a fully active ionization calorimeter composed of 22 radiation lengths of Bismuth Germanate (BGO) crystals. This detector complement is very similar to the baseline calorimeter for the Advanced Cosmic Ray Composition Experiment for the Space Station, ACCESS. The ATIC flights can be used to evaluate such a calorimeter in the cosmic ray 'beam.' ATIC integration is currently underway with a first flight expected during 1999. This talk will discuss ATIC as it applies to ACCESS.

  2. Chile-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Kenya, Mexico, South Africa, Thailand and Vietnam), to share practices on setting national greenhouse gas emissions baseline scenarios. The aim of the workstream is to...

  3. Ethiopia-National Greenhouse Gas Emissions Baseline Scenarios...

    Open Energy Info (EERE)

    National Greenhouse Gas Emissions Baseline Scenarios: Learning from Experiences in Developing Countries Jump to: navigation, search Name Ethiopia-National Greenhouse Gas Emissions...

  4. EA-1943: Long Baseline Neutrino Facility/Deep Underground Neutrino...

    Broader source: Energy.gov (indexed) [DOE]

    May 27, 2015 EA-1943: Draft Environmental Assessment Long Baseline Neutrino FacilityDeep Underground Neutrino Experiment (LBNFDUNE) at Fermilab, Batavia, Illinois and the...

  5. NETL - Bituminous Baseline Performance and Cost Interactive Tool...

    Open Energy Info (EERE)

    from the Cost and Performance Baseline for Fossil Energy Plants - Bituminous Coal and Natural Gas to Electricity report. The tool provides an interactive summary of the full...

  6. Cost and Performance Comparison Baseline for Fossil Energy Power...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    blocks together into a new, revolutionary concept for future coal-based power and energy production. Objective To establish baseline performance and cost estimates for today's...

  7. Updates to the International Linear Collider Damping Rings Baseline...

    Office of Scientific and Technical Information (OSTI)

    Updates to the International Linear Collider Damping Rings Baseline Design Citation Details In-Document Search Title: Updates to the International Linear Collider Damping Rings...

  8. South Africa - Greenhouse Gas Emission Baselines and Reduction...

    Open Energy Info (EERE)

    from Buildings AgencyCompany Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis,...

  9. Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials...

    Open Energy Info (EERE)

    from Buildings AgencyCompany Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis,...

  10. U.S. Department of Energy Performance Baseline Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    The guide supports DOE O 413.3A and identifies key performance baseline development processes and practices. Does not cancel other directives.

  11. Sandia Energy - Scaled Wind Farm Technology Facility Baselining...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accelerates Work Home Renewable Energy Energy SWIFT Facilities Partnership News Wind Energy News & Events Systems Analysis Scaled Wind Farm Technology Facility Baselining...

  12. River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sands Jim Hansen U.S. Department of Energy - Richland Operations Office October 12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB advice #246 * RCBRA Ecological Risk Assessment (Draft C) was transmitted to regulators September 27 * Columbia River Component - Draft Ecological Screening Level Risk Assessment ready for regulator review - Draft Human health risk assessment will be

  13. Tank Waste Remediation System (TWRS) Technical Baseline Summary Description

    SciTech Connect (OSTI)

    TEDESCHI, A.R.

    2000-04-21

    This revision notes the supersedure of the subject document by concurrent issuance of HNF-1901 ''Technical Baseline Summary Description for the Tank Farm Contractor'', Revision 2. Safe storage mission technical baseline information was absorbed by the new revision of HNF-1901.

  14. Tank waste remediation system technical baseline summary description

    SciTech Connect (OSTI)

    Raymond, R.E.

    1998-01-08

    This document is one of the tools used to develop and control the mission work as depicted in the included figure. This Technical Baseline Summary Description document is the top-level tool for management of the Technical Baseline for waste storage operations.

  15. Application of non-radiometric methods to the determination of plutonium. Literature review conducted for the Buried Waste Integrated Program

    SciTech Connect (OSTI)

    Edelson, M.C.

    1992-03-05

    This literature review was motivated by discussions that took place during a review of contamination control technologies proposed for INEL (buried waste). It should be a useful tool in identifying non-radiation measurement techniques for Pu and Am such as ICP-MS, which should fulfill the following criteria: apparatus must be field deployable; up to 100 samples per day; and lower levels of detection and required time must be listed. The sensitivity of ICP and RIMS is compared against that needed for contamination monitoring at INEL. Only Pu-241, with a required detection limit of 400 ppt, would challenge the sensitivity of ICP-MS; Pu-238 would be easily determined. The need to determine Pu-238 and Am-241 in the presence of U-238 and Pu-241 seems to preclude the possibility of using laser ablation ICP-MS for Pu monitoring. ICP-AES and -LEAFS methods may not have enough sensitivity to determine Pu-238 at 2 ppb level with confidence, but RIMS (resonance ionization mass spectroscopy) should be adequate. 47 refs, figs.

  16. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    2013-05-15

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  17. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  18. Review and Status of Wind Integration and Transmission in the United States. Key Issues and Lessons Learned

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Acker, T.; Ahlstrom, M.; Frew, B.; Goggin, M.; Lasher, W.; Marquis, M.; Osborn, D.

    2015-03-01

    The objective in electric power system operation is to use generation and transmission resources within organizational constraints and operational rules and regulations to reliably and costeffectively balance load and generation. To meet this objective, system operational practices have been created to accommodate the innate variability and uncertainty that comes from a variety of sources, such as uncertainty of demand forecasts, whether a specific generating unit will be available when called upon, the variability of demand from many different types of customers, and others. As more wind power is connected to the power system, operating experiences acquired during the past several years have generally confirmed the findings of wind integration studies: wind energy increases the level of variability and uncertainty that a system operator must manage.

  19. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flow sheet simulation (PFS) model. This report summarizes the activities completed during the period December 23, 1992 through March 15, 1992. In Task 1, Baseline Design and Alternates, the following activities related to the tradeoff studies were completed: approach and basis; oxygen purity; F-T reactor pressure; wax yield; autothermal reformer; hydrocarbons (C{sub 3}/C{sub 4}s) recovery; and hydrogenrecovery. In Task 3, Engineering Design Criteria, activities were initiated to support the process tradeoff studies in Task I and to develop the environmental strategy for the Illinois site. The work completed to date consists of the development of the F-T reactor yield correlation from the Mobil dam and a brief review of the environmental strategy prepared for the same site in the direct liquefaction baseline study.Some work has also been done in establishing site-related criteria, in establishing the maximum vessel diameter for train sizing and in coping with the low H{sub 2}/CO ratio from the Shell gasifier. In Task 7, Project Management and Administration, the following activities were completed: the subcontract agreement between Amoco and Bechtel was negotiated; a first technical progress meeting was held at the Bechtel office in February; and the final Project Management Plan was approved by PETC and issued in March 1992.

  20. 2010 DOE EERE Vehicle Technologies Program Merit Review … Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration 2010 DOE EERE Vehicle Technologies Program Merit Review Technology Integration Technology integration merit review results PDF icon 2010amr08.pdf ...

  1. CD-2, Approve Performance Baseline | Department of Energy

    Office of Environmental Management (EM)

    2, Approve Performance Baseline CD-2, Approve Performance Baseline CD-2, Approve Performance Baseline << Resource Center | CD-3 >> Description Completion of preliminary design is the first major milestone in the project Execution Phase. The design must be sufficiently mature (refer to DOE O 413.3B, Appendix C, Paragraph 4) at the time of CD-2 approval to provide reasonable assurance that the design will be implementable within the approved PB. The document signed by the CE or PME

  2. Baseline design/economics for advanced Fischer-Tropsch technology

    SciTech Connect (OSTI)

    Not Available

    1992-04-27

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis, and the computer model will be the major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide, and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal.

  3. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    1 Independent Oversight Review, Los Alamos National Laboratory - December 2011 December 2011 Review of the Independent Integrated Safety ManagementIntegrated Work Management...

  4. Draft of M2 Report on Integration of the Hybrid Hydride Model into INL's MBM Framework for Review

    SciTech Connect (OSTI)

    Tikare, Veena; Weck, Philippe F.; Schultz, Peter A.; Clark, Blythe; Glazoff, Michael; Homer, Eric

    2014-07-01

    This report documents the development, demonstration and validation of a mesoscale, microstructural evolution model for simulation of zirconium hydride {delta}-ZrH{sub 1.5} precipitation in the cladding of used nuclear fuels that may occur during long-term dry storage. While the Zr-based claddings are manufactured free of any hydrogen, they absorb hydrogen during service, in the reactor by a process commonly termed ‘hydrogen pick-up’. The precipitation and growth of zirconium hydrides during dry storage is one of the most likely fuel rod integrity failure mechanisms either by embrittlement or delayed hydride cracking of the cladding. While the phenomenon is well documented and identified as a potential key failure mechanism during long-term dry storage (NUREG/CR-7116), the ability to actually predict the formation of hydrides is poor. The model being documented in this work is a computational capability for the prediction of hydride formation in different claddings of used nuclear fuels. This work supports the Used Fuel Disposition Research and Development Campaign in assessing the structural engineering performance of the cladding during and after long-term dry storage. This document demonstrates a basic hydride precipitation model that is built on a recently developed hybrid Potts-phase field model that combines elements of Potts-Monte Carlo and the phase-field models. The model capabilities are demonstrated along with the incorporation of the starting microstructure, thermodynamics of the Zr-H system and the hydride formation mechanism.

  5. Mechanical integrity implementation and related process safety management elements

    SciTech Connect (OSTI)

    Hudson, K.M. [General Physics Corp., San Diego, CA (United States)

    1995-12-31

    The OSHA Process Safety Management (PSM) rule requires covered facilities to establish a mechanical integrity (MI) program. The MI program must address an ongoing effort to maintain the integrity of process equipment and safety systems by providing written procedures, training, inspection and testing, and quality assurance. Development of an MI program requires information from other PSM elements such as equipment process safety information and employee participation as building blocks for the program. Information obtained from other elements of PSM can be used as the basis for inspection and testing, frequency of testing, written maintenance procedures, training of maintenance personnel, and quality assurance of spare parts and newly installed equipment. This paper presents highlights in the implementation of a mechanical integrity program. A description of the use of process safety information and baseline inspections is detailed with appropriate examples. The MI program stems from an initial documentation review, and culminates in a completely functional MI program in compliance with the regulation.

  6. U.S Department of Energy Performance Baseline Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-23

    This guide identifies key Performance Baseline (PB) elements, development processes, and practices; describes the context in which DOE PB development occurs; and suggests ways of addressing the critical elements in PB development.

  7. Cost and Performance Baseline for Fossil Energy Plants Volume...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    www.netl.doe.gov This page intentionally left blank Cost and Performance Baseline for Coal-to-SNG and Ammonia (Volume 2) i Table of Contents LIST OF EXHIBITS......

  8. Biodiversity Research Institute Mid-Atlantic Baseline Study Webinar

    Broader source: Energy.gov [DOE]

    Carried out by the Biodiversity Research Institute (BRI) and funded by the U.S. Department of Energy Wind and Water Power Technology Office and other partners, the goal of the Mid-Atlantic Baseline...

  9. ENERGY STAR PortfolioManager Baseline Year Instructions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    using the template you created Once the report has been generated, download it as an Excel file Open downloaded "Baseline Year" report, select all and copy In report spreadsheet, ...

  10. Baselines For Land-Use Change In The Tropics: Application ToAvoided Deforestation Projects

    SciTech Connect (OSTI)

    Brown, Sandra; Hall, Myrna; Andrasko, Ken; Ruiz, Fernando; Marzoli, Walter; Guerrero, Gabriela; Masera, Omar; Dushku, Aaron; Dejong,Ben; Cornell, Joseph

    2007-06-01

    Although forest conservation activities particularly in thetropics offer significant potential for mitigating carbon emissions,these types of activities have faced obstacles in the policy arena causedby the difficulty in determining key elements of the project cycle,particularly the baseline. A baseline for forest conservation has twomain components: the projected land-use change and the correspondingcarbon stocks in the applicable pools such as vegetation, detritus,products and soil, with land-use change being the most difficult toaddress analytically. In this paper we focus on developing and comparingthree models, ranging from relatively simple extrapolations of pasttrends in land use based on simple drivers such as population growth tomore complex extrapolations of past trends using spatially explicitmodels of land-use change driven by biophysical and socioeconomicfactors. The three models of the latter category used in the analysis atregional scale are The Forest Area Change (FAC) model, the Land Use andCarbon Sequestration (LUCS) model, and the Geographical Modeling (GEOMOD)model. The models were used to project deforestation in six tropicalregions that featured different ecological and socioeconomic conditions,population dynamics, and uses of the land: (1) northern Belize; (2) SantaCruz State, Bolivia; (3) Parana State in Brazil; (4) Campeche, Mexico;(5) Chiapas, Mexico; and (6) Michoacan, Mexico. A comparison of all modeloutputs across all six regions shows that each model produced quitedifferent deforestation baseline. In general, the simplest FAC model,applied at the national administrative-unit scale, projected the highestamount of forest loss (four out of six) and the LUCS model the leastamount of loss (four out of five). Based on simulations of GEOMOD, wefound that readily observable physical and biological factors as well asdistance to areas of past disturbance were each about twice as importantas either sociological/demographic or economic/infrastructure factors(less observable) in explaining empirical land-use patterns. We proposefrom the lessons learned, a methodology comprised of three main steps andsix tasks can be used to begin developing credible baselines. We alsopropose that the baselines be projected over a 10-year period because,although projections beyond 10 years are feasible, they are likely to beunrealistic for policy purposes. In the first step, an historic land-usechange and deforestation estimate is made by determining the analyticdomain (size of the region relative to the size of proposed project),obtaining historic data, analyzing candidate historic baseline drivers,and identifying three to four major drivers. In the second step, abaseline of where deforestation is likely to occur --a potential land-usechange (PLUC) map is produced using a spatial model such as GEOMOD thatuses the key drivers from step one. Then rates of deforestation areprojected over a 10-year baseline period using any of the three models.Using the PLUC maps, projected rates of deforestation, and carbon stockestimates, baselineprojections are developed that can be used for projectGHG accounting and crediting purposes: The final step proposes that, atagreed interval (eg, +10 years), the baseline assumptions about baselinedrivers be re-assessed. This step reviews the viability of the 10-yearbaseline in light of changes in one or more key baseline drivers (e.g.,new roads, new communities, new protected area, etc.). The potentialland-use change map and estimates of rates of deforestation could beredone at the agreed interval, allowing the rates and changes in spatialdrivers to be incorporated into a defense of the existing baseline, orderivation of a new baseline projection.

  11. Annual Technology Baseline (Including Supporting Data); NREL (National

    Office of Scientific and Technical Information (OSTI)

    Renewable Energy Laboratory) (Conference) | SciTech Connect SciTech Connect Search Results Conference: Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory) Citation Details In-Document Search Title: Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory) Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain

  12. Hanford Site waste treatment/storage/disposal integration

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    1999-02-24

    In 1998 Waste Management Federal Services of Hanford, Inc. began the integration of all low-level waste, mixed waste, and TRU waste-generating activities across the Hanford site. With seven contractors, dozens of generating units, and hundreds of waste streams, integration was necessary to provide acute waste forecasting and planning for future treatment activities. This integration effort provides disposition maps that account for waste from generation, through processing, treatment and final waste disposal. The integration effort covers generating facilities from the present through the life-cycle, including transition and deactivation. The effort is patterned after the very successful DOE Complex EM Integration effort. Although still in the preliminary stages, the comprehensive onsite integration effort has already reaped benefits. These include identifying significant waste streams that had not been forecast, identifying opportunities for consolidating activities and services to accelerate schedule or save money; and identifying waste streams which currently have no path forward in the planning baseline. Consolidation/integration of planned activities may also provide opportunities for pollution prevention and/or avoidance of secondary waste generation. A workshop was held to review the waste disposition maps, and to identify opportunities with potential cost or schedule savings. Another workshop may be held to follow up on some of the long-term integration opportunities. A change to the Hanford waste forecast data call would help to align the Solid Waste Forecast with the new disposition maps.

  13. Functional Testing Protocols for Commercial Building Efficiency Baseline Modeling Software

    SciTech Connect (OSTI)

    Jump, David; Price, Phillip N.; Granderson, Jessica; Sohn, Michael

    2013-09-06

    This document describes procedures for testing and validating proprietary baseline energy modeling software accuracy in predicting energy use over the period of interest, such as a month or a year. The procedures are designed according to the methodology used for public domain baselining software in another LBNL report that was (like the present report) prepared for Pacific Gas and Electric Company: ?Commercial Building Energy Baseline Modeling Software: Performance Metrics and Method Testing with Open Source Models and Implications for Proprietary Software Testing Protocols? (referred to here as the ?Model Analysis Report?). The test procedure focuses on the quality of the software?s predictions rather than on the specific algorithms used to predict energy use. In this way the software vendor is not required to divulge or share proprietary information about how their software works, while enabling stakeholders to assess its performance.

  14. Handbook Issued on NEPA and CEQA: Integrating Federal and State...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Handbook Issued on NEPA and CEQA: Integrating Federal and State Environmental Reviews Handbook Issued on NEPA and CEQA: Integrating Federal and State Environmental Reviews March 7, ...

  15. Develop Standard Method of Test for Integrated Heat Pump - 2013...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review Emerging Technologies ...

  16. Precision Measurements of Long-Baseline Neutrino Oscillation at LBNF

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Worcester, Elizabeth

    2015-08-06

    In a long-baseline neutrino oscillation experiment, the primary physics objectives are to determine the neutrino mass hierarchy, to determine the octant of the neutrino mixing angle θ23, to search for CP violation in neutrino oscillation, and to precisely measure the size of any CP-violating effect that is discovered. This presentation provides a brief introduction to these measurements and reports on efforts to optimize the design of a long-baseline neutrino oscillation experiment, the status of LBNE, and the transition to an international collaboration at LBNF.

  17. Precision Measurements of Long-Baseline Neutrino Oscillation at LBNF

    SciTech Connect (OSTI)

    Worcester, Elizabeth

    2015-08-06

    In a long-baseline neutrino oscillation experiment, the primary physics objectives are to determine the neutrino mass hierarchy, to determine the octant of the neutrino mixing angle θ23, to search for CP violation in neutrino oscillation, and to precisely measure the size of any CP-violating effect that is discovered. This presentation provides a brief introduction to these measurements and reports on efforts to optimize the design of a long-baseline neutrino oscillation experiment, the status of LBNE, and the transition to an international collaboration at LBNF.

  18. Buildings Performance Database- 2013 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  19. Microsoft PowerPoint - FinalModule7.ppt

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Integrated Baseline Review and Change Control Prepared by: Module 7 - Integrated Baseline Review and Change Control 1 Prepared by: Booz Allen Hamilton Module 7: Integrated ...

  20. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    SciTech Connect (OSTI)

    Renfro, G.G.

    1994-12-20

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices.

  1. BASELINE DESIGN/ECONOMICS FOR ADVANCED FISCHER-TROPSCH TECHNOLOGY

    SciTech Connect (OSTI)

    1998-04-01

    Bechtel, along with Amoco as the main subcontractor, developed a Baseline design, two alternative designs, and computer process simulation models for indirect coal liquefaction based on advanced Fischer-Tropsch (F-T) technology for the U. S. Department of Energy's (DOE's) Federal Energy Technology Center (FETC).

  2. THE FIRST VERY LONG BASELINE INTERFEROMETRIC SETI EXPERIMENT

    SciTech Connect (OSTI)

    Rampadarath, H.; Morgan, J. S.; Tingay, S. J.; Trott, C. M.

    2012-08-15

    The first Search for Extra-Terrestrial Intelligence (SETI) conducted with very long baseline interferometry (VLBI) is presented. By consideration of the basic principles of interferometry, we show that VLBI is efficient at discriminating between SETI signals and human generated radio frequency interference (RFI). The target for this study was the star Gliese 581, thought to have two planets within its habitable zone. On 2007 June 19, Gliese 581 was observed for 8 hr at 1230-1544 MHz with the Australian Long Baseline Array. The data set was searched for signals appearing on all interferometer baselines above five times the noise limit. A total of 222 potential SETI signals were detected and by using automated data analysis techniques were ruled out as originating from the Gliese 581 system. From our results we place an upper limit of 7 MW Hz{sup -1} on the power output of any isotropic emitter located in the Gliese 581 system within this frequency range. This study shows that VLBI is ideal for targeted SETI including follow-up observations. The techniques presented are equally applicable to next-generation interferometers, such as the long baselines of the Square Kilometre Array.

  3. Technical Baseline Summary Description for the Tank Farm Contractor

    SciTech Connect (OSTI)

    TEDESCHI, A.R.

    2000-04-21

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford.

  4. 241-AZ Farm Annulus Extent of Condition Baseline Inspection

    SciTech Connect (OSTI)

    Engeman, Jason K.; Girardot, Crystal L.; Vazquez, Brandon J.

    2013-05-15

    This report provides the results of the comprehensive annulus visual inspection for tanks 241- AZ-101 and 241-AZ-102 performed in fiscal year 2013. The inspection established a baseline covering about 95 percent of the annulus floor for comparison with future inspections. Any changes in the condition are also included in this document.

  5. Microsoft PowerPoint - Snippet 4.6 Baseline Control Methods 20140723...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to an approved performance baseline, including impacts on the project scope, schedule, design, methods, and cost baselines. The BCP represents a change to one or more of the...

  6. Demonstrating and Deploying Integrated Retrofit Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstrating and Deploying Integrated Retrofit Technologies and Solutions - 2014 BTO Peer Review Demonstrating and Deploying Integrated Retrofit Technologies and Solutions - 2014 ...

  7. Building-Integrated Heat & Moisture Exchange

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building-Integrated Heat & Moisture Exchange 2014 Building Technologies Office Peer Review ... scales the energy benefits of large-scale, wall- integrated heat & moisture exchangers. ...

  8. Independent Peer Reviews

    SciTech Connect (OSTI)

    2012-03-16

    Independent Assessments: DOE's Systems Integrator convenes independent technical reviews to gauge progress toward meeting specific technical targets and to provide technical information necessary for key decisions.

  9. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Contractor- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Contractor Operational Readiness Review

  10. Baseline ecological risk assessment Salmon Site, Lamar County, Mississippi

    SciTech Connect (OSTI)

    1995-04-01

    The Salmon Site (SS), formerly the Tatum Dome Test Site, located in Mississippi was the site of two nuclear and two gas explosion tests conducted between 1964 and 1970. A consequence of these testing activities is that radionuclides were released into the salt dome, where they are presently contained. During reentry drilling and other site activities, incidental liquid and solid wastes that contained radioactivity were generated, resulting in some soil, ground water and equipment contamination. As part of the remedial investigation effort, a Baseline Ecological Risk Assessment was conducted at the SS. The purpose is to gauge ecological and other environmental impacts attributable to past activities at the former test facility. The results of this facility-specific baseline risk assessment are presented in this document.

  11. Baseline measurements of terrestrial gamma radioactivity at the CEBAF site

    SciTech Connect (OSTI)

    Wollenberg, H.A.; Smith, A.R.

    1991-10-01

    A survey of the gamma radiation background from terrestrial sources was conducted at the CEBAF site, Newport News, Virginia, on November 12--16, 1990, to provide a gamma radiation baseline for the site prior to the startup of the accelerator. The concentrations and distributions of the natural radioelements in exposed soil were measured, and the results of the measurements were converted into gamma-ray exposure rates. Concurrently, samples were collected for laboratory gamma spectral analyses.

  12. Hybrid Electric Vehicle Fleet and Baseline Performance Testing

    SciTech Connect (OSTI)

    J. Francfort; D. Karner

    2006-04-01

    The U.S. Department of Energys Advanced Vehicle Testing Activity (AVTA) conducts baseline performance and fleet testing of hybrid electric vehicles (HEV). To date, the AVTA has completed baseline performance testing on seven HEV models and accumulated 1.4 million fleet testing miles on 26 HEVs. The HEV models tested or in testing include: Toyota Gen I and Gen II Prius, and Highlander; Honda Insight, Civic and Accord; Chevrolet Silverado; Ford Escape; and Lexus RX 400h. The baseline performance testing includes dynamometer and closed track testing to document the HEVs fuel economy (SAE J1634) and performance in a controlled environment. During fleet testing, two of each HEV model are driven to 160,000 miles per vehicle within 36 months, during which maintenance and repair events, and fuel use is recorded and used to compile life-cycle costs. At the conclusion of the 160,000 miles of fleet testing, the SAE J1634 tests are rerun and each HEV battery pack is tested. These AVTA testing activities are conducted by the Idaho National Laboratory, Electric Transportation Applications, and Exponent Failure Analysis Associates. This paper discusses the testing methods and results.

  13. Lawrence Livermore National Laboratory Emergency Response Capability 2009 Baseline Needs Assessment Performance Assessment

    SciTech Connect (OSTI)

    Sharry, J A

    2009-12-30

    This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by Sandia/CA Fire Marshal, Martin Gresho. This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2009 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2004 BNA, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures. On October 1, 2007, LLNL contracted with the Alameda County Fire Department to provide emergency response services. The level of service called for in that contract is the same level of service as was provided by the LLNL Fire Department prior to that date. This Compliance Assessment will evaluate fire department services beginning October 1, 2008 as provided by the Alameda County Fire Department.

  14. Emerging Technologies Program Overview - 2013 BTO Peer Review...

    Broader source: Energy.gov (indexed) [DOE]

    Prioritization Tool - 2013 BTO Peer Review Advanced Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review Develop Standard Method of Test for Integrated Heat Pump - 2013

  15. DOE Vehicle Technologies Program 2009 Merit Review Report - Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration and Education DOE Vehicle Technologies Program 2009 Merit Review Report - Technology Integration and Education Merit review of DOE Vehicle Technologies ...

  16. Integrated Security System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    control systems architecture PDF icon Integrated Security System More Documents & Publications Cybersecurity for Energy Delivery Systems 2010 Peer Review Presentations - ...

  17. Vehicle Technologies Office Merit Review 2014: Development of 3rd Generation Advanced High Strength Steels (AHSS) with an Integrated Experimental and Simulation Approach

    Broader source: Energy.gov [DOE]

    Presentation given by Pacific Northwest National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

  18. Comparison between the Strength Levels of Baseline Nuclear-Grade Graphite and Graphite Irradiated in AGC-2

    SciTech Connect (OSTI)

    Carroll, Mark Christopher

    2015-07-01

    This report details the initial comparison of mechanical strength properties between the cylindrical nuclear-grade graphite specimens irradiated in the second Advanced Graphite Creep (AGC-2) experiment with the established baseline, or unirradiated, mechanical properties compiled in the Baseline Graphite Characterization program. The overall comparative analysis will describe the development of an appropriate test protocol for irradiated specimens, the execution of the mechanical tests on the AGC-2 sample population, and will further discuss the data in terms of developing an accurate irradiated property distribution in the limited amount of irradiated data by leveraging the considerably larger property datasets being captured in the Baseline Graphite Characterization program. Integrating information on the inherent variability in nuclear-grade graphite with more complete datasets is one of the goals of the VHTR Graphite Materials program. Between “sister” specimens, or specimens with the same geometry machined from the same sub-block of graphite from which the irradiated AGC specimens were extracted, and the Baseline datasets, a comprehensive body of data will exist that can provide both a direct and indirect indication of the full irradiated property distributions that can be expected of irradiated nuclear-grade graphite while in service in a VHTR system. While the most critical data will remain the actual irradiated property measurements, expansion of this data into accurate distributions based on the inherent variability in graphite properties will be a crucial step in qualifying graphite for nuclear use as a structural material in a VHTR environment.

  19. NREL: MIDC/SRRL Baseline Measurement System (39.74 N, 105.18 W, 1829 m,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GMT-7) Solar Radiation Research Laboratory Baseline Measurement System

  20. TWRS phase I privatization site environmental baseline and characterization plan

    SciTech Connect (OSTI)

    Shade, J.W.

    1997-09-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan.

  1. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    2014-01-02

    FSR Part I presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region. FSR Part II presents (1) 278 new gravity stations; (2) enhanced gravity-magnetic modeling; (3) 42 new ambient seismic noise survey stations; (4) an integration of the new seismic noise data with a regional seismic network; (5) a new methodology and approach to interpret this data; (5) a novel method to predict rock type and temperature based on the newly interpreted data; (6) 70 new magnetotelluric (MT) stations; (7) an integrated interpretation of the enhanced MT data set; (8) the results of a 308 station soil CO2 gas survey; (9) new conductive thermal modeling in the project area; (10) new convective modeling in the Calibration Area; (11) pseudo-convective modeling in the Calibration Area; (12) enhanced data implications and qualitative geoscience correlations at three scales (a) Regional, (b) Project, and (c) Calibration Area; (13) quantitative geostatistical exploratory data analysis; and (14) responses to nine questions posed in the proposal for this investigation. Enhanced favorability/trust maps were not generated because there was not a sufficient amount of new, fully-vetted (see below) rock type, temperature, and stress data. The enhanced seismic data did generate a new method to infer rock type and temperature. However, in the opinion of the Principal Investigator for this project, this new methodology needs to be tested and evaluated at other sites in the Basin and Range before it is used to generate the referenced maps. As in the baseline conceptual model, the enhanced findings can be applied to both the hydrothermal system and EGS in the Dixie Valley region.

  2. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    FSR Part I presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region. FSR Part II presents (1) 278 new gravity stations; (2) enhanced gravity-magnetic modeling; (3) 42 new ambient seismic noise survey stations; (4) an integration of the new seismic noise data with a regional seismic network; (5) a new methodology and approach to interpret this data; (5) a novel method to predict rock type and temperature based on the newly interpreted data; (6) 70 new magnetotelluric (MT) stations; (7) an integrated interpretation of the enhanced MT data set; (8) the results of a 308 station soil CO2 gas survey; (9) new conductive thermal modeling in the project area; (10) new convective modeling in the Calibration Area; (11) pseudo-convective modeling in the Calibration Area; (12) enhanced data implications and qualitative geoscience correlations at three scales (a) Regional, (b) Project, and (c) Calibration Area; (13) quantitative geostatistical exploratory data analysis; and (14) responses to nine questions posed in the proposal for this investigation. Enhanced favorability/trust maps were not generated because there was not a sufficient amount of new, fully-vetted (see below) rock type, temperature, and stress data. The enhanced seismic data did generate a new method to infer rock type and temperature. However, in the opinion of the Principal Investigator for this project, this new methodology needs to be tested and evaluated at other sites in the Basin and Range before it is used to generate the referenced maps. As in the baseline conceptual model, the enhanced findings can be applied to both the hydrothermal system and EGS in the Dixie Valley region.

  3. Quality Assurance Baseline Assessment Report to Los Alamos National Laboratory Analytical Chemistry Operations

    SciTech Connect (OSTI)

    Jordan, R. A.

    1998-09-01

    This report summarizes observations that were made during a Quality Assurance (QA) Baseline Assessment of the Nuclear Materials Technology Analytical Chemistry Group (NMT-1). The Quality and Planning personnel, for NMT-1, are spending a significant amount of time transitioning out of their roles of environmental oversight into production oversight. A team from the Idaho National Engineering and Environmental Laboratory Defense Program Environmental Surety Program performed an assessment of the current status of the QA Program. Several Los Alamos National Laboratory Analytical Chemistry procedures were reviewed, as well as Transuranic Waste Characterization Program (TWCP) QA documents. Checklists were developed and the assessment was performed according to an Implementation Work Plan, INEEL/EXT-98-00740.

  4. COMPARISON OF THREE METHODS TO PROJECT FUTURE BASELINE CARBON EMISSIONS IN TEMPERATE RAINFOREST, CURINANCO, CHILE

    SciTech Connect (OSTI)

    Patrick Gonzalez; Antonio Lara; Jorge Gayoso; Eduardo Neira; Patricio Romero; Leonardo Sotomayor

    2005-07-14

    Deforestation of temperate rainforests in Chile has decreased the provision of ecosystem services, including watershed protection, biodiversity conservation, and carbon sequestration. Forest conservation can restore those ecosystem services. Greenhouse gas policies that offer financing for the carbon emissions avoided by preventing deforestation require a projection of future baseline carbon emissions for an area if no forest conservation occurs. For a proposed 570 km{sup 2} conservation area in temperate rainforest around the rural community of Curinanco, Chile, we compared three methods to project future baseline carbon emissions: extrapolation from Landsat observations, Geomod, and Forest Restoration Carbon Analysis (FRCA). Analyses of forest inventory and Landsat remote sensing data show 1986-1999 net deforestation of 1900 ha in the analysis area, proceeding at a rate of 0.0003 y{sup -1}. The gross rate of loss of closed natural forest was 0.042 y{sup -1}. In the period 1986-1999, closed natural forest decreased from 20,000 ha to 11,000 ha, with timber companies clearing natural forest to establish plantations of non-native species. Analyses of previous field measurements of species-specific forest biomass, tree allometry, and the carbon content of vegetation show that the dominant native forest type, broadleaf evergreen (bosque siempreverde), contains 370 {+-} 170 t ha{sup -1} carbon, compared to the carbon density of non-native Pinus radiata plantations of 240 {+-} 60 t ha{sup -1}. The 1986-1999 conversion of closed broadleaf evergreen forest to open broadleaf evergreen forest, Pinus radiata plantations, shrublands, grasslands, urban areas, and bare ground decreased the carbon density from 370 {+-} 170 t ha{sup -1} carbon to an average of 100 t ha{sup -1} (maximum 160 t ha{sup -1}, minimum 50 t ha{sup -1}). Consequently, the conversion released 1.1 million t carbon. These analyses of forest inventory and Landsat remote sensing data provided the data to evaluate the three methods to project future baseline carbon emissions. Extrapolation from Landsat change detection uses the observed rate of change to estimate change in the near future. Geomod is a software program that models the geographic distribution of change using a defined rate of change. FRCA is an integrated spatial analysis of forest inventory, biodiversity, and remote sensing that produces estimates of forest biodiversity and forest carbon density, spatial data layers of future probabilities of reforestation and deforestation, and a projection of future baseline forest carbon sequestration and emissions for an ecologically-defined area of analysis. For the period 1999-2012, extrapolation from Landsat change detection estimated a loss of 5000 ha and 520,000 t carbon from closed natural forest; Geomod modeled a loss of 2500 ha and 250 000 t; FRCA projected a loss of 4700 {+-} 100 ha and 480,000 t (maximum 760,000 t, minimum 220,000 t). Concerning labor time, extrapolation for Landsat required 90 actual days or 120 days normalized to Bachelor degree level wages; Geomod required 240 actual days or 310 normalized days; FRCA required 110 actual days or 170 normalized days. Users experienced difficulties with an MS-DOS version of Geomod before turning to the Idrisi version. For organizations with limited time and financing, extrapolation from Landsat change provides a cost-effective method. Organizations with more time and financing could use FRCA, the only method where that calculates the deforestation rate as a dependent variable rather than assuming a deforestation rate as an independent variable. This research indicates that best practices for the projection of baseline carbon emissions include integration of forest inventory and remote sensing tasks from the beginning of the analysis, definition of an analysis area using ecological characteristics, use of standard and widely used geographic information systems (GIS) software applications, and the use of species-specific allometric equations and wood densities developed for local species.

  5. Baseline Glass Development for Combined Fission Products Waste Streams

    SciTech Connect (OSTI)

    Crum, Jarrod V.; Billings, Amanda Y.; Lang, Jesse B.; Marra, James C.; Rodriguez, Carmen P.; Ryan, Joseph V.; Vienna, John D.

    2009-06-29

    Borosilicate glass was selected as the baseline technology for immobilization of the Cs/Sr/Ba/Rb (Cs), lanthanide (Ln) and transition metal fission product (TM) waste steams as part of a cost benefit analysis study.[1] Vitrification of the combined waste streams have several advantages, minimization of the number of waste forms, a proven technology, and similarity to waste forms currently accepted for repository disposal. A joint study was undertaken by Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) to develop acceptable glasses for the combined Cs + Ln + TM waste streams (Option 1) and Cs + Ln combined waste streams (Option 2) generated by the AFCI UREX+ set of processes. This study is aimed to develop baseline glasses for both combined waste stream options and identify key waste components and their impact on waste loading. The elemental compositions of the four-corners study were used along with the available separations data to determine the effect of burnup, decay, and separations variability on estimated waste stream compositions.[2-5] Two different components/scenarios were identified that could limit waste loading of the combined Cs + LN + TM waste streams, where as the combined Cs + LN waste stream has no single component that is perceived to limit waste loading. Combined Cs + LN waste stream in a glass waste form will most likely be limited by heat due to the high activity of Cs and Sr isotopes.

  6. Moving baseline for evaluation of advanced coal-extraction systems

    SciTech Connect (OSTI)

    Bickerton, C.R.; Westerfield, M.D.

    1981-04-15

    This document reports results from the initial effort to establish baseline economic performance comparators for a program whose intent is to define, develop, and demonstrate advanced systems suitable for coal resource extraction beyond the year 2000. Systems used in this study were selected from contemporary coal mining technology and from conservative conjectures of year 2000 technology. The analysis was also based on a seam thickness of 6 ft. Therefore, the results are specific to the study systems and the selected seam thickness. To be more beneficial to the program, the effort should be extended to other seam thicknesses. This document is one of a series which describe systems level requirements for advanced underground coal mining equipment. Five areas of performance are discussed: production cost, miner safety, miner health, environmental impact, and recovery efficiency. The projections for cost and production capability comprise a so-called moving baseline which will be used to assess compliance with the systems requirement for production cost. Separate projections were prepared for room and pillar, longwall, and shortwall technology all operating under comparable sets of mining conditions. This work is part of an effort to define and develop innovative coal extraction systems suitable for the significant resources remaining in the year 2000.

  7. SCFA lead lab technical assistance at Lawrence Berkeley National Laboratory: Baseline review of three groundwater plumes

    SciTech Connect (OSTI)

    Hazen, Terry; et al.

    2002-09-26

    During the closeout session, members of the technical assistance team conveyed to the site how impressed they were at the thoroughness of the site's investigation and attempts at remediation. Team members were uniformly pleased at the skilled detection work to identify sources, make quick remediation decisions, and change course when a strategy did not work well. The technical assistance team also noted that, to their knowledge, this is the only DOE site at which a world-class scientist has had primary responsibility for the environmental restoration activities. This has undoubtedly contributed to the successes observed and DOE should take careful note. The following overall recommendations were agreed upon: (1) The site has done a phenomenal job of characterization and identifying and removing source terms. (2) Technologies selected to date are appropriate and high impact, e.g. collection trenches are an effective remedial strategy for this complicated geology. The site should continue using technology that is adapted to the site's unique geology, such as the collection trenches. (3) The site should develop a better way to determine the basis of cleanup for all sites. (4) The sentinel well system should be evaluated and modified, if needed, to assure that the sentinel wells provide coverage to the current site boundary. Potential modifications could include installation, abandonment or relocation of wells based on the large amount of data collected since the original sentinel well system was designed. (5) Modeling to assist in remedial design and communication should continue. (6) The site should develop a plan to ensure institutional memory. (7) The most likely possibility for improving closure to 2006 is by removing the residual source of the Old Town plume and establishing the efficacy of remediation for the 51/64 plume.

  8. System maintenance verification and validation plan for the TWRS controlled baseline database system

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    TWRS Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the verification and validation approach for system documentation changes within the database system.

  9. Waste Assessment Baseline for the IPOC Second Floor, West Wing

    SciTech Connect (OSTI)

    McCord, Samuel A

    2015-04-01

    Following a building-wide waste assessment in September, 2014, and subsequent presentation to Sandia leadership regarding the goal of Zero Waste by 2025, the occupants of the IPOC Second Floor, West Wing contacted the Materials Sustainability and Pollution Prevention (MSP2) team to guide them to Zero Waste in advance of the rest of the site. The occupants are from Center 3600, Public Relations and Communications , and Center 800, Independent Audit, Ethics and Business Conduct . To accomplish this, MSP2 conducted a new limited waste assessment from March 2-6, 2015 to compare the second floor, west wing to the building as a whole. The assessment also serves as a baseline with which to mark improvements in diversion in approximately 6 months.

  10. Direct coal liquefaction baseline design and system analysis

    SciTech Connect (OSTI)

    Not Available

    1991-04-01

    The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based on two stage direct coupled catalytic reactors. This primary objective is to be accomplished by completing the following: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a cost estimate and economic analysis; a computer model incorporating the above two steps over a wide range of capacities and selected process alternatives; a comprehensive training program for DOE/PETC Staff to understand and use the computer model; a thorough documentation of all underlying assumptions for baseline economics; and a user manual and training material which will facilitate updating of the model in the future.

  11. Direct coal liquefaction baseline design and system analysis

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based on two stage direct coupled catalytic reactors. This primary objective is to be accomplished by completing the following: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a cost estimate and economic analysis; a computer model incorporating the above two steps over a wide range of capacities and selected process alternatives; a comprehensive training program for DOE/PETC Staff to understand and use the computer model; a thorough documentation of all underlying assumptions for baseline economics; and a user manual and training material which will facilitate updating of the model in the future.

  12. Sandia National Laboratories, California proposed CREATE facility environmental baseline survey.

    SciTech Connect (OSTI)

    Catechis, Christopher Spyros

    2013-10-01

    Sandia National Laboratories, Environmental Programs completed an environmental baseline survey (EBS) of 12.6 acres located at Sandia National Laboratories/California (SNL/CA) in support of the proposed Collaboration in Research and Engineering for Advanced Technology and Education (CREATE) Facility. The survey area is comprised of several parcels of land within SNL/CA, County of Alameda, California. The survey area is located within T 3S, R 2E, Section 13. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contamination liabilities associated with the property; develop sufficient information to assess the health and safety risks; and ensure adequate protection for human health and the environment related to a specific property.

  13. Better Buildings Alliance Equipment Performance Specifications- 2013 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  14. Independent Oversight Review, Lawrence Livermore National Laboratory- September 2011

    Broader source: Energy.gov [DOE]

    Review of Integrated Safety Management System Effectiveness at Lawrence Livermore National Laboratory

  15. Standard Energy Efficiency Database Platform- 2013 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  16. Technology Integration | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Vehicle Technologies Plenary PDF icon vtpn02_smith_ti_2011_o.pdf More Documents & Publications Technology Integration Overview Technology Integration Overview Technology Integration Overview

  17. 2013 Transmission Reliability Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Reliability Program Peer Review 2013 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations are available through the individual session links. The agenda and introduction by Joe Eto, LBNL, are available below. Day 1: June 27 Session I Baselining Studies and Analysis, Bharat Bhargava, EPG Baselining Studies and Analysis, Brett Amidan, PNNL Synchrophasor Standards Support and

  18. Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment

    SciTech Connect (OSTI)

    1995-03-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing the extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.

  19. GTA (ground test accelerator) Phase 1: Baseline design report

    SciTech Connect (OSTI)

    Not Available

    1986-08-01

    The national Neutral Particle Beam (NPB) program has two objectives: to provide the necessary basis for a discriminator/weapon decision by 1992, and to develop the technology in stages that lead ultimately to a neutral particle beam weapon. The ground test accelerator (GTA) is the test bed that permits the advancement of the state-of-the-art under experimental conditions in an integrated automated system mode. An intermediate goal of the GTA program is to support the Integrated Space Experiments, while the ultimate goal is to support the 1992 decision. The GTA system and each of its major subsystems are described, and project schedules and resource requirements are provided. (LEW)

  20. Idaho National Laboratorys Greenhouse Gas FY08 Baseline

    SciTech Connect (OSTI)

    Jennifer D. Morton

    2011-06-01

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13514 requires that federal agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL's FY08 GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL's organizational boundaries but are a consequence of INL's activities). This inventory found that INL generated a total of 113,049 MT of CO2-equivalent emissions during FY08. The following conclusions were made from looking at the results of the individual contributors to INL's baseline GHG inventory: (1) Electricity (including the associated transmission and distribution losses) is the largest contributor to INL's GHG inventory, with over 50% of the CO2e emissions; (2) Other sources with high emissions were stationary combustion (facility fuels), waste disposal (including fugitive emissions from the onsite landfill and contracted disposal), mobile combustion (fleet fuels), employee commuting, and business air travel; and (3) Sources with low emissions were wastewater treatment (onsite and contracted), fugitive emissions from refrigerants, and business ground travel (in personal and rental vehicles). This report details the methods behind quantifying INL's GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by the Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only that large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

  1. Idaho National Laboratorys Greenhouse Gas FY08 Baseline

    SciTech Connect (OSTI)

    Jennifer D. Morton

    2010-09-01

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at the INL. Additionally, the INL has a desire to see how its emissions compare with similar institutions, including other DOE-sponsored national laboratories. Executive Order 13514 requires that federally-sponsored agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INLs FY08 GHG inventory was calculated according to methodologies identified in Federal recommendations and an as-yet-unpublished Technical and Support Document (TSD) using operational control boundary. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INLs organizational boundaries but are a consequence of INLs activities). This inventory found that INL generated a total of 114,256 MT of CO2-equivalent emissions during fiscal year 2008 (FY08). The following conclusions were made from looking at the results of the individual contributors to INLs baseline GHG inventory: Electricity is the largest contributor to INLs GHG inventory, with over 50% of the net anthropogenic CO2e emissions Other sources with high emissions were stationary combustion, fugitive emissions from the onsite landfill, mobile combustion (fleet fuels) and the employee commute Sources with low emissions were contracted waste disposal, wastewater treatment (onsite and contracted) and fugitive emissions from refrigerants. This report details the methods behind quantifying INLs GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to stress that the methodology behind this inventory followed guidelines that have not yet been formally adopted. Thus, some modification of the conclusions may be necessary as additional guidance is received. Further, because this report differentiates between those portions of the INL that are managed and operated by the Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only that large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

  2. CBEI: Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review | Department of Energy Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer Review CBEI: Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer Review Presenter: John Messner, PSU View the Presentation PDF icon CBEI: Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer Review More Documents & Publications CBEI: Enhancing OpenStudio for Airflow and Daylight Modeling - 2015 Peer Review CBEI: Lessons Learned from Integrated Retrofits in

  3. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    SciTech Connect (OSTI)

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

  4. Development Of Regional Climate Mitigation Baseline For A DominantAgro-Ecological Zone Of Karnataka, India

    SciTech Connect (OSTI)

    Sudha, P.; Shubhashree, D.; Khan, H.; Hedge, G.T.; Murthy, I.K.; Shreedhara, V.; Ravindranath, N.H.

    2007-06-01

    Setting a baseline for carbon stock changes in forest andland use sector mitigation projects is an essential step for assessingadditionality of the project. There are two approaches for settingbaselines namely, project-specific and regional baseline. This paperpresents the methodology adopted for estimating the land available formitigation, for developing a regional baseline, transaction cost involvedand a comparison of project-specific and regional baseline. The studyshowed that it is possible to estimate the potential land and itssuitability for afforestation and reforestation mitigation projects,using existing maps and data, in the dry zone of Karnataka, southernIndia. The study adopted a three-step approach for developing a regionalbaseline, namely: i) identification of likely baseline options for landuse, ii) estimation of baseline rates of land-use change, and iii)quantification of baseline carbon profile over time. The analysis showedthat carbon stock estimates made for wastelands and fallow lands forproject-specific as well as the regional baseline are comparable. Theratio of wasteland Carbon stocks of a project to regional baseline is1.02, and that of fallow lands in the project to regional baseline is0.97. The cost of conducting field studies for determination of regionalbaseline is about a quarter of the cost of developing a project-specificbaseline on a per hectare basis. The study has shown the reliability,feasibility and cost-effectiveness of adopting regional baseline forforestry sectormitigation projects.

  5. Scientific Opportunities with the Long-Baseline Neutrino Experiment

    SciTech Connect (OSTI)

    Adams, C.; et al.,

    2013-07-28

    In this document, we describe the wealth of science opportunities and capabilities of LBNE, the Long-Baseline Neutrino Experiment. LBNE has been developed to provide a unique and compelling program for the exploration of key questions at the forefront of particle physics. Chief among the discovery opportunities are observation of CP symmetry violation in neutrino mixing, resolution of the neutrino mass hierarchy, determination of maximal or near-maximal mixing in neutrinos, searches for nucleon decay signatures, and detailed studies of neutrino bursts from galactic supernovae. To fulfill these and other goals as a world-class facility, LBNE is conceived around four central components: (1) a new, intense wide-band neutrino source at Fermilab, (2) a fine-grained `near' neutrino detector just downstream of the source, (3) the Sanford Underground Research Facility (SURF) in Lead, South Dakota at an optimal distance (~1300 km) from the neutrino source, and (4) a massive liquid argon time-projection chamber (LArTPC) deployed there as a 'far' detector. The facilities envisioned are expected to enable many other science opportunities due to the high event rates and excellent detector resolution from beam neutrinos in the near detector and atmospheric neutrinos in the far detector. This is a mature, well developed, world class experiment whose relevance, importance, and probability of unearthing critical and exciting physics has increased with time.

  6. Pentek metal coating removal system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  7. Ultra-high pressure water jet: Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The ultra-high pressure waterjet technology was being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The ultra-high pressure waterjet technology acts as a cutting tool for the removal of surface substrates. The Husky{trademark} pump feeds water to a lance that directs the high pressure water at the surface to be removed. The safety and health evaluation during the testing demonstration focused on two main areas of exposure. These were dust and noise. The dust exposure was found to be minimal, which would be expected due to the wet environment inherent in the technology, but noise exposure was at a significant level. Further testing for noise is recommended because of the outdoor environment where the testing demonstration took place. In addition, other areas of concern found were arm-hand vibration, ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, fall hazards, slipping hazards, hazards associated with the high pressure water, and hazards associated with air pressure systems.

  8. Pentek concrete scabbling system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The Pentek scabbling technology was tested at Florida International University (FIU) and is being evaluated as a baseline technology. This report evaluates it for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek concrete scabbling system consisted of the MOOSE, SQUIRREL-I, and SQUIRREL-III scabblers. The scabblers are designed to scarify concrete floors and slabs using cross-section, tungsten carbide tipped bits. The bits are designed to remove concrete in 318 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation conducted during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure was minimal, but noise exposure was significant. Further testing for each of these exposures is recommended. Because of the outdoor environment where the testing demonstration took place, results may be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed operating environment. Other areas of concern were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  9. LTC vacuum blasting machine (metal) baseline report: Greenbook (chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  10. LTC vacuum blasting maching (concrete): Baseline report: Greenbook (Chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The LTC shot blast technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjuction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC 1073 Vacuum Blasting Machine uses a high-capacity, direct-pressure blasting system which incorporates a continuous feed for the blast media. The blast media cleans the surface within the contained brush area of the blast. It incorporates a vacuum system which removes dust and debris from the surface as it is blasted. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure during maintenance activities was minimal, but due to mechanical difficulties dust monitoring could not be conducted during operation. Noise exposure was significant. Further testing for each of these exposures is recommended because of the outdoor environment where the testing demonstration took place. This may cause the results to be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed environment. In addition, other safety and health issues found were ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, and arm-hand vibration.

  11. CBEI: Lessons Learned from Integrated Retrofits in Small and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings - 2015 Peer Review CBEI: Lessons Learned from Integrated Retrofits in Small and Medium ...

  12. Demonstrations of Integrated Advanced Rooftop Unit Controls and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstrations of Integrated Advanced Rooftop Unit Controls and Automated Fault Detection and Diagnostics - 2014 BTO Peer Review Demonstrations of Integrated Advanced Rooftop Unit...

  13. Eastern Wind Integration and Transmission Study -- Preliminary Findings: Preprint

    SciTech Connect (OSTI)

    Corbus, D.; Milligan, M.; Ela, E.; Schuerger, M.; Zavadil, B.

    2009-09-01

    This paper reviews the Eastern Wind Integration and Transmission Study, the development of wind datasets, the transmission analysis, and the results of wind integration analysis for four scenarios.

  14. Slide 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page 2 What Is the IBR? * Definition - An evaluation of the contractor's project baseline ... measurement baseline - Work scope definition Page 14 Integrated Baseline Review ...

  15. India's baseline plan for nuclear energy self-sufficiency.

    SciTech Connect (OSTI)

    Bucher, R .G.; Nuclear Engineering Division

    2009-01-01

    India's nuclear energy strategy has traditionally strived for energy self-sufficiency, driven largely by necessity following trade restrictions imposed by the Nuclear Suppliers Group (NSG) following India's 'peaceful nuclear explosion' of 1974. On September 6, 2008, the NSG agreed to create an exception opening nuclear trade with India, which may create opportunities for India to modify its baseline strategy. The purpose of this document is to describe India's 'baseline plan,' which was developed under constrained trade conditions, as a basis for understanding changes in India's path as a result of the opening of nuclear commerce. Note that this treatise is based upon publicly available information. No attempt is made to judge whether India can meet specified goals either in scope or schedule. In fact, the reader is warned a priori that India's delivery of stated goals has often fallen short or taken a significantly longer period to accomplish. It has been evident since the early days of nuclear power that India's natural resources would determine the direction of its civil nuclear power program. It's modest uranium but vast thorium reserves dictated that the country's primary objective would be thorium utilization. Estimates of India's natural deposits vary appreciably, but its uranium reserves are known to be extremely limited, totaling approximately 80,000 tons, on the order of 1% of the world's deposits; and nominally one-third of this ore is of very low uranium concentration. However, India's roughly 300,000 tons of thorium reserves account for approximately 30% of the world's total. Confronted with this reality, the future of India's nuclear power industry is strongly dependent on the development of a thorium-based nuclear fuel cycle as the only way to insure a stable, sustainable, and autonomous program. The path to India's nuclear energy self-sufficiency was first outlined in a seminal paper by Drs. H. J. Bhabha and N. B. Prasad presented at the Second United Nations Conference on the Peaceful Uses of Atomic Energy in 1958. The paper described a three stage plan for a sustainable nuclear energy program consistent with India's limited uranium but abundant thorium natural resources. In the first stage, natural uranium would be used to fuel graphite or heavy water moderated reactors. Plutonium extracted from the spent fuel of these thermal reactors would drive fast reactors in the second stage that would contain thorium blankets for breeding uranium-233 (U-233). In the final stage, this U-233 would fuel thorium burning reactors that would breed and fission U-233 in situ. This three stage blueprint still reigns as the core of India's civil nuclear power program. India's progress in the development of nuclear power, however, has been impacted by its isolation from the international nuclear community for its development of nuclear weapons and consequent refusal to sign the Nuclear Nonproliferation Treaty (NPT). Initially, India was engaged in numerous cooperative research programs with foreign countries; for example, under the 'Atoms for Peace' program, India acquired the Cirus reactor, a 40 MWt research reactor from Canada moderated with heavy water from the United States. India was also actively engaged in negotiations for the NPT. But, on May 18, 1974, India conducted a 'peaceful nuclear explosion' at Pokharan using plutonium produced by the Cirus reactor, abruptly ending the era of international collaboration. India then refused to sign the NPT, which it viewed as discriminatory since it would be required to join as a non-nuclear weapons state. As a result of India's actions, the Nuclear Suppliers Group (NSG) was created in 1975 to establish guidelines 'to apply to nuclear transfers for peaceful purposes to help ensure that such transfers would not be diverted to unsafeguarded nuclear fuel cycle or nuclear explosive activities. These nuclear export controls have forced India to be largely self-sufficient in all nuclear-related technologies.

  16. Long-Term Stewardship Baseline Report and Transition Guidance

    SciTech Connect (OSTI)

    Kristofferson, Keith

    2001-11-01

    Long-term stewardship consists of those actions necessary to maintain and demonstrate continued protection of human health and the environment after facility cleanup is complete. As the Department of Energys (DOE) lead laboratory for environmental management programs, the Idaho National Engineering and Environmental Laboratory (INEEL) administers DOEs long-term stewardship science and technology efforts. The INEEL provides DOE with technical, and scientific expertise needed to oversee its long-term environmental management obligations complexwide. Long-term stewardship is administered and overseen by the Environmental Management Office of Science and Technology. The INEEL Long-Term Stewardship Program is currently developing the management structures and plans to complete INEEL-specific, long-term stewardship obligations. This guidance document (1) assists in ensuring that the program leads transition planning for the INEEL with respect to facility and site areas and (2) describes the classes and types of criteria and data required to initiate transition for areas and sites where the facility mission has ended and cleanup is complete. Additionally, this document summarizes current information on INEEL facilities, structures, and release sites likely to enter long-term stewardship at the completion of DOEs cleanup mission. This document is not intended to function as a discrete checklist or local procedure to determine readiness to transition. It is an overarching document meant as guidance in implementing specific transition procedures. Several documents formed the foundation upon which this guidance was developed. Principal among these documents was the Long-Term Stewardship Draft Technical Baseline; A Report to Congress on Long-Term Stewardship, Volumes I and II; Infrastructure Long-Range Plan; Comprehensive Facility Land Use Plan; INEEL End-State Plan; and INEEL Institutional Plan.

  17. Lawrence Livermore National Laboratory Emergency Response Capability Baseline Needs Assessment Requirement Document

    SciTech Connect (OSTI)

    Sharry, J A

    2009-12-30

    This revision of the LLNL Fire Protection Baseline Needs Assessment (BNA) was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by Martin Gresho, Sandia/CA Fire Marshal. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only address emergency response. The original LLNL BNA was created on April 23, 1997 as a means of collecting all requirements concerning emergency response capabilities at LLNL (including response to emergencies at Sandia/CA) into one BNA document. The original BNA documented the basis for emergency response, emergency personnel staffing, and emergency response equipment over the years. The BNA has been updated and reissued five times since in 1998, 1999, 2000, 2002, and 2004. A significant format change was performed in the 2004 update of the BNA in that it was 'zero based.' Starting with the requirement documents, the 2004 BNA evaluated the requirements, and determined minimum needs without regard to previous evaluations. This 2010 update maintains the same basic format and requirements as the 2004 BNA. In this 2010 BNA, as in the previous BNA, the document has been intentionally divided into two separate documents - the needs assessment (1) and the compliance assessment (2). The needs assessment will be referred to as the BNA and the compliance assessment will be referred to as the BNA Compliance Assessment. The primary driver for separation is that the needs assessment identifies the detailed applicable regulations (primarily NFPA Standards) for emergency response capabilities based on the hazards present at LLNL and Sandia/CA and the geographical location of the facilities. The needs assessment also identifies areas where the modification of the requirements in the applicable NFPA standards is appropriate, due to the improved fire protection provided, the remote location and low population density of some the facilities. As such, the needs assessment contains equivalencies to the applicable requirements. The compliance assessment contains no such equivalencies and simply assesses the existing emergency response resources to the requirements of the BNA and can be updated as compliance changes independent of the BNA update schedule. There are numerous NFPA codes and standards and other requirements and guidance documents that address the subject of emergency response. These requirements documents are not always well coordinated and may contain duplicative or conflicting requirements or even coverage gaps. Left unaddressed, this regulatory situation results in frequent interpretation of requirements documents. Different interpretations can then lead to inconsistent implementation. This BNA addresses this situation by compiling applicable requirements from all identified sources (see Section 5) and analyzing them collectively to address conflict and overlap as applicable to the hazards presented by the LLNL and Sandia/CA sites (see Section 7). The BNA also generates requirements when needed to fill any identified gaps in regulatory coverage. Finally, the BNA produces a customized simple set of requirements, appropriate for the DOE protection goals, such as those defined in DOE O 420.1B, the hazard level, the population density, the topography, and the site layout at LLNL and Sandia/CA that will be used as the baseline requirements set - the 'baseline needs' - for emergency response at LLNL and Sandia/CA. A template approach is utilized to accomplish this evaluation for each of the nine topical areas that comprise the baseline needs for emergency response. The basis for conclusions reached in determining the baseline needs for each of the topical areas is presented in Sections 7.1 through 7.9. This BNA identifies only mandatory requirements and establishes the minimum performance criteria. The minimum performance criteria may not be the level of performance desired Lawrence Livermore National Laboratory or Sandia/CA. Performance at levels greater than those established by this document will provide a higher level of fire safety, fire protection, or loss control and is encouraged. In Section 7, Determination of Baseline Needs, a standard template was used to describe the process used that involves separating basic emergency response needs into nine separate services. Each service being evaluated contains a determination of minimum requirements, an analysis of the requirements, a statement of minimum performance, and finally a summary of the minimum performance. The requirement documents, listed in Section 5, are those laws, regulations, DOE Directives, contractual obligations, or LLNL policies that establish service levels. The determination of minimum requirements section explains the rationale or method used to determine the minimum requirements.

  18. Independent Oversight Review, West Valley Demonstration Project

    Office of Environmental Management (EM)

    Federal - June 2012 | Department of Energy Federal - June 2012 Independent Oversight Review, Sodium Bearing Waste Treatment Project - Federal - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. The review was performed March

  19. 2008 CHP Baseline Assessment and Action Plan for the California Market |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy California Market 2008 CHP Baseline Assessment and Action Plan for the California Market This 2008 report provides an updated baseline assessment and action plan for combined heat and power (CHP) in California and identifies hurdles that prevent the expanded use of CHP systems. This report was prepared by the Pacific Region CHP Application Center (RAC). PDF icon chp_california_2008.pdf More Documents & Publications 2008 CHP Baseline Assessment and Action Plan for the

  20. Aerial Measuring System (AMS) Baseline Surveys for Emergency Planning

    SciTech Connect (OSTI)

    Lyons, C

    2012-06-04

    Originally established in the 1960s to support the Nuclear Test Program, the AMS mission is to provide a rapid and comprehensive worldwide aerial measurement, analysis, and interpretation capability in response to a nuclear/radiological emergency. AMS provides a responsive team of individuals whose processes allow for a mission to be conducted and completed with results available within hours. This presentation slide-show reviews some of the history of the AMS, summarizes present capabilities and methods, and addresses the value of the surveys.

  1. LEDSGP/Transportation Toolkit/Key Actions/Create a Baseline ...

    Open Energy Info (EERE)

    a Baseline) Jump to: navigation, search LEDSGP Logo.png Transportation Toolkit Home Tools Training Request Assistance Key Actions for Low-Emission Development in Transportation...

  2. U.S. Department of Energy Performance Baseline Guide - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5A, U.S. Department of Energy Performance Baseline Guide by Brian Kong Functional areas: Program Management, Project Management, Work Processes This guide identifies key PB...

  3. Integrated Safety Management System Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-11-01

    This manual provides requirements and guidance for DOE and contractors to ensure development and implementation of an effective Integrated Safety Management system that is periodically reviewed and continuously improved. Canceled by DOE O 450.2.

  4. Integrated Chemical Geothermometry System for Geothermal Exploration

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Develop practical and reliable system to predict geothermal reservoir temperatures from integrated chemical analyses of spring and well fluids.

  5. Summary - Major Risk Factors Integrated Facility Disposition...

    Office of Environmental Management (EM)

    Office of Environmental Management (DOE-EM) External Technical Review of the Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN Why DOE-EM Did...

  6. Commercial Buildings Integration Program Overview - 2016 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office's Commercial Buildings Integration Program. Through robust feedback, the BTO ...

  7. Residential Buildings Integration Program Overview - 2016 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO ...

  8. Residential Buildings Integration Program Overview - 2015 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation at the 2015 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO ...

  9. Residential Buildings Integration Program Overview - 2014 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO ...

  10. Commercial Buildings Integration Program Overview - 2015 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation at the 2015 Peer Review provided an overview of the Building Technologies Office's Commercial Buildings Integration Program. Through robust feedback, the BTO ...

  11. Demonstration and Deployment Successes: Sapphire Integrated Algal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Sapphire Energy, Inc. Demonstration-Scale Project 2013 Peer Review Presentations-Integrated Biorefineries The Promise and Challenge of Algae as ...

  12. Integrated Computational Materials Engineering (ICME) for Mg...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon lm012li2011o.pdf More Documents & Publications Integrated Computational Materials Engineering ...

  13. System maintenance test plan for the TWRS controlled baseline database system

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented.

  14. Cost and performance baseline for fossil energy plants

    SciTech Connect (OSTI)

    2007-05-15

    The objective of this report is to present performance and cost data for fossil energy power systems, specifically integrated gasification combined cycle (IGCC), pulverized coal (PC), and natural gas combined cycle (NGCC) plants, in a consistent technical and economic manner that accurately reflects current market conditions for plants starting operation in 2010. This is Volume 2 of the three-volume report. Twelve different power plant design configurations were analyzed. These include six IGCC cases utilizing the General Electric Energy (GEE), ConocoPhillips (CoP), and Shell gasifiers each with and without CO{sub 2} capture, and six cases representing conventional technologies: PC-subcritical, PC-supercritical, and NGCC plants both with and without CO{sub 2} capture. Cases 7 and 8 were originally included in this study and involve production of synthetic natural gas (SNG) and the repowering of an existing NGCC facility using SNG. The two SNG cases were subsequently moved to Volume 2 of this report resulting in the discontinuity of case numbers (1-6 and 9-14). Chapter 2 provides the basis for technical, environmental and cost evaluations. Chapter 3 describes the IGCC technologies modeled and presents the results for the six IGCC cases. Chapter 4 describes the PC technologies modeled and presents the results for the four PC cases. Chapter 5 described the NGCC technologies modeled and presents the results for the two NGCC cases. Chapter 6 contains the reference list. 64 refs., 253 exhibits.

  15. Grid Integration

    SciTech Connect (OSTI)

    Not Available

    2008-09-01

    Summarizes the goals and activities of the DOE Solar Energy Technologies Program efforts within its grid integration subprogram.

  16. Wellbore Integrity Network

    SciTech Connect (OSTI)

    Carey, James W.; Bachu, Stefan

    2012-06-21

    In this presentation, we review the current state of knowledge on wellbore integrity as developed in the IEA Greenhouse Gas Programme's Wellbore Integrity Network. Wells are one of the primary risks to the successful implementation of CO{sub 2} storage programs. Experimental studies show that wellbore materials react with CO{sub 2} (carbonation of cement and corrosion of steel) but the impact on zonal isolation is unclear. Field studies of wells in CO{sub 2}-bearing fields show that CO{sub 2} does migrate external to casing. However, rates and amounts of CO{sub 2} have not been quantified. At the decade time scale, wellbore integrity is driven by construction quality and geomechanical processes. Over longer time-scales (> 100 years), chemical processes (cement degradation and corrosion) become more important, but competing geomechanical processes may preserve wellbore integrity.

  17. Independent Oversight Review, Los Alamos National Laboratory- December 2011

    Broader source: Energy.gov [DOE]

    Review of the Independent Integrated Safety Management/Integrated Work Management Assessment of Research and Development and Programmatic Work at the Los Alamos National Laboratory

  18. Integrated Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Review (IPR) Quarterly Business Review (QBR) Access to Capital Debt Management July 2013 Aug. 2013 Sept. 2013 Oct. 2013 Nov. 2013 Dec. 2013 Jan. 2014 Feb. 2014 March...

  19. DOE Vehicle Technologies Program 2009 Merit Review Report - Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Vehicle Technologies Program 2009 Merit Review Report - Technology Validation DOE Vehicle Technologies Program 2009 Merit Review Report - Technology Integration and Education ...

  20. Building Energy Modeling Library - 2013 BTO Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Energy Modeling Library - 2013 BTO Peer Review Building Energy Modeling Library - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building...

  1. Breckinridge Project, initial effort. Report VII, Volume II. Environmental baseline report

    SciTech Connect (OSTI)

    1982-01-01

    Ashland Synthetic Fuels, Inc. (ASFI) and Airco Energy Company, Inc. (AECI) have recently formed the Breckinridge Project and are currently conducting a process and economic feasibility study of a commercial scale facility to produce synthetic liquid fuels from coal. The coal conversion process to be used is the H-COAL process, which is in the pilot plant testing stage under the auspices of the US Department of Energy at the H-COAL Pilot Plant Project near Catlettsburg, Kentucky. The preliminary plans for the commercial plant are for a 18,140 metric ton/day (24,000 ton/day) nominal coal assumption capacity utilizing the abundant high sulfur Western Kentucky coals. The Western Kentucky area offers a source of the coal along with adequate water, power, labor, transportation and other factors critical to the successful siting of a plant. Various studies by federal and state governments, as well as private industry, have reached similar conclusions regarding the suitability of such plant sites in western Kentucky. Of the many individual sites evaluated, a site in Breckinridge County, Kentucky, approximately 4 kilometers (2.5 miles) west of the town of Stephensport, has been identified as the plant location. Actions have been taken to obtain options to insure that this site will be available when needed. This report contains an overview of the regional setting and results of the baseline environmental studies. These studies include collection of data on ambient air and water quality, sound, aquatic and terrestrial biology and geology. This report contains the following chapters; introduction, review of significant findings, ambient air quality monitoring, sound, aquatic ecology, vegetation, wildlife, geology, soils, surface water, and ground water.

  2. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, October--December 1991

    SciTech Connect (OSTI)

    Not Available

    1992-04-27

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis, and the computer model will be the major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide, and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal.

  3. Procurement Integrity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ------------------------------Chapter 3.1 (Dec 2015) 1 Procurement Integrity [Reference: 41 U.S.C. 423, FAR 3.104, DEAR 903.104] Overview This section discusses the requirements of the Procurement Integrity Act and its impact on Federal employees. Background The Department of Energy (DOE), like most federal agencies, purchases many products and services from the private sector. To preserve the integrity of the Federal procurement process and assure fair treatment of bidders, offerors and

  4. Procurement Integrity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    To preserve the integrity of the Federal procurement process and assure fair treatment of bidders, offerors and contractors, laws govern the procurement process and the manner in ...

  5. Insolation integrator

    DOE Patents [OSTI]

    Dougherty, John J.; Rudge, George T.

    1980-01-01

    An electric signal representative of the rate of insolation is integrated to determine if it is adequate for operation of a solar energy collection system.

  6. An evaluation of baseline conditions at lease tract C-a, Rio Blanco County, Colorado

    SciTech Connect (OSTI)

    Barteaux, W.L.; Biezugbe, G.

    1987-09-01

    An analysis was made of baseline groundwater quality data from oil shale lease tract C-a, managed by Rio Blanco Oil Shale Company. The data are limited in several respects. All conclusions drawn from the data must be qualified with these limitations. Baseline conditions were determined by analyzing data from wells in the upper bedrock and lower bedrock aquifers and from the alluvial wells. Baseline data were considered all data collected before mining operations began. The water quality was then evaluated using the 1987 Colorado State Basic Standards for Ground Water as a basis. The maximum baseline values for several parameters in each aquifer exceed the standard values. The quality of the upper lower bedrock aquifers varies from region to region within the site. Data on the lower bedrock aquifer are insufficient for speculation on the cause of the variations. Variations in the upper bedrock aquifer are possibly caused by leakage of the lower bedrock aquifer. 16 refs., 9 figs., 9 tabs.

  7. TWRS privatization phase I - site characterization and environmental baseline work plan

    SciTech Connect (OSTI)

    Reidel, S.P.; Hodges, F.N., Westinghouse Hanford

    1996-08-27

    This work plan defines the steps necessary to develop a Site Characterization Plan and Environmental Baseline for the TWRS Privatization Phase I area. The Data Quality Objectives Process will be the primary tool used to develop these plans.

  8. EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Slides Only PDF icon Slides with Notes Key Resources PMCDP EVMS PARS IIe FPD ... 4.6 Baseline Control Methods EVMS Training Snippet: 4.9 High-level EVM Expectations

  9. The Science and Strategy for Phasing of the Long-Baseline Neutrino Experiment

    SciTech Connect (OSTI)

    Diwan, Milind V.

    2012-05-22

    This note is about the principles behind a phased plan for realizing a Long-Baseline Neutrino Experiment(LBNE) in the U.S.. The most important issue that must be resolved is the direction of the first phase of the experiment. Based on both scientific and programmatic considerations, the U.S. should pursue the best option for accelerator neutrino physics, which is the longer baseline towards Homestake with an optimizedbroadband intense beam.

  10. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, April--June 1993

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of this study are to: (1) Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. (2) Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. (3) Develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that PETC will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks: Task 1: Establish the baseline design and alternatives. Task 2: Evaluate baseline and alternative economics. Task 3: Develop engineering design criteria. Task 4: Develop a process flowsheet simulation (PFS) model. Task 5: Perform sensitivity studies using the PFS model. Task 6: Document the PFS model and develop a DOE training session on its use. Task 7: Perform project management, technical coordination and other miscellaneous support functions. During the reporting period, work progressed on Tasks 1, 4 and 7. This report covers work done during the period and consists of four sections: Introduction and Summary. Task 1--Baseline Design and Alternatives. Task 4--Process Flowsheet Simulation (PFS) Model, and Project Management and Staffing Report.

  11. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1993

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM- 5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case, and develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks: Task 1, establish the baseline design and alternatives; Task 2, evaluate baseline and alternative economics; Task 3, develop engineering design criteria; Task 4, develop a process flowsheet simulation (PFS) model; Task 5, perform sensitivity studies using the PFS model; Task 6, document the PFS model and develop a DOE training session on its use; and Task 7, perform project management, technical coordination and other miscellaneous support functions. This report covers work done during the period and consists of four sections: Introduction and summary; Task 1, baseline design and alternatives; Task 4, process flowsheet simulation (PFS) model; and project management and staffing report.

  12. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, October--December 1994

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of the study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that PETC will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks. Task 1: Establish the baseline design and alternatives. Task 2: Evaluate baseline and alternative economics. Task 3: Develop engineering design criteria. Task 4: Develop a process flowsheet simulation model. Task 5: Perform sensitivity studies using the PFS model. Task 6: Document the PFS model and develop a DOE training session on its use, and Task 7: Perform project management, technical coordination and other miscellaneous support functions. During the reporting period, work progressed on Tasks 1, 4 and 7. This report covers work done during the period and consists of four sections: Introduction and Summary. Task 1--Baseline Design and Alternatives. Task 4--Process Flowsheet Simulation Model. Project Management and Staffing Report.

  13. 2008 CHP Baseline Assessment and Action Plan for the Hawaii Market |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hawaii Market 2008 CHP Baseline Assessment and Action Plan for the Hawaii Market The purpose of this 2008 report is to provide an updated baseline assessment and action plan for combined heat and power (CHP) in Hawaii and to identify the hurdles that prevent the expanded use of CHP systems. This report was prepared by the Pacific Region CHP Application Center (RAC). PDF icon chp_hawaii_2008.pdf More Documents & Publications Renewable Power Options for Electricity

  14. Independent Oversight Review, Idaho Cleanup Project- August 2014

    Broader source: Energy.gov [DOE]

    Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Contractor Readiness Assessment at the Idaho Site.

  15. ORNL: HVAC Lab Research - 2015 Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Integration Program Overview - 2015 BTO Peer Review Space Conditioning Standing Technical Committee Strategic Plan Building America Expert Meeting: Recommended...

  16. Enterprise Assessments Review, Idaho Cleanup Project- September 2014

    Broader source: Energy.gov [DOE]

    Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Federal Readiness Assessment at the Idaho Site

  17. 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Review | Department of Energy 4 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Plenary I: Progress in Advanced Biofuels 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Gerson Santos-Leon, Executive Vice President, Abengoa PDF icon santos-leon_biomass_2014.pdf More Documents & Publications Abengoa IBR Successes Applicant

  18. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, April--June 1994

    SciTech Connect (OSTI)

    1994-01-01

    The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor steam from the flurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case, develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis and computer model will be major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. During the reporting period, work progressed on Tasks 1, 4, 5, 6 and 7. This report covers work done during the period and consists of six sections: introduction and summary; Task 1, baseline design and alternatives; Task 4, process flowsheet simulation (PFS) model; Task 5, perform sensitivity studies using the PFS model; Task 6, document the PFS model and develop a DOE training session on its use, and project management and staffing report.

  19. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, October--December 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    Bechtel, with Amoco as the main subcontractor, initiated a study on September 26, 1991, for the US Department of Energy`s (DOE`s) Pittsburgh Energy Technology Center (PETC) to develop a computer model and baseline design for advanced Fischer-Tropsch (F-T) technology. This 24-month study, with an approved budget of $2.3 million, is being performed under DOE Contract Number AC22-91PC90027. (1) Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. (2) Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. (3) Develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis and computer model will be major research planning tools that PETC will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal.

  20. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1994

    SciTech Connect (OSTI)

    1994-12-31

    The objectives of the study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western, coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model. During the reporting period, work progressed on Tasks 1, 2, 4, 6 and 7. This report covers work done during the period and consists of four sections: Introduction and Summary. Task 1: Baseline Design and Alternatives. Task 2: Evaluate baseline and alternative economics. Task 4: Process Flowsheet Simulation (PFS) model. Task 6: Document the PFS model and develop a DOE training session on its use and Project Management and Staffing Report.

  1. Statistical Analysis of Baseline Load Models for Non-Residential Buildings

    SciTech Connect (OSTI)

    Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

    2008-11-10

    Policymakers are encouraging the development of standardized and consistent methods to quantify the electric load impacts of demand response programs. For load impacts, an essential part of the analysis is the estimation of the baseline load profile. In this paper, we present a statistical evaluation of the performance of several different models used to calculate baselines for commercial buildings participating in a demand response program in California. In our approach, we use the model to estimate baseline loads for a large set of proxy event days for which the actual load data are also available. Measures of the accuracy and bias of different models, the importance of weather effects, and the effect of applying morning adjustment factors (which use data from the day of the event to adjust the estimated baseline) are presented. Our results suggest that (1) the accuracy of baseline load models can be improved substantially by applying a morning adjustment, (2) the characterization of building loads by variability and weather sensitivity is a useful indicator of which types of baseline models will perform well, and (3) models that incorporate temperature either improve the accuracy of the model fit or do not change it.

  2. Wind Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Generation - ScheduledActual Balancing Reserves - Deployed Near Real-time Wind Animation Wind Projects under Review Growth Forecast Fact Sheets Working together to address...

  3. Abengoa Integrated Biorefineries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Biorefineries Abengoa Integrated Biorefineries Demonstration and Deployment Successes Gerson Santos, Executive Vice President, Abengoa PDF icon b13_santos_ap-2.pdf More Documents & Publications 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Biomass IBR Fact Sheet: Abengoa Bioenergy Abengoa IBR Successes

  4. Renewable and Distributed Systems Integration Peer Review

    Energy Savers [EERE]

    4 Denver Marriott West Golden, Colorado AGENDA Tuesday, November 2, 2010 8:00 am Registration and Continental Breakfast 9:00 am-9:10 am Welcome Dr. Robert Hawsey, Associate Laboratory Director for Renewable Electricity and End Use Systems, US DOE-National Renewable Energy Laboratory 9:10 am-9:25 am Overview of Smart Grid Program Eric Lightner, U.S. Department of Energy 9:25 am-9:40 am Overview of Smart Grid Research and Development Activities Dan Ton, U.S. Department of Energy Moderator -

  5. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  6. External Technical Review Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon External Technical Review Report More Documents & Publications Technology Readiness Assessment Report Compilation of ETR Summaries Major Risk Factors Integrated Facility ...

  7. Review of storage battery system cost estimates

    SciTech Connect (OSTI)

    Brown, D.R.; Russell, J.A.

    1986-04-01

    Cost analyses for zinc bromine, sodium sulfur, and lead acid batteries were reviewed. Zinc bromine and sodium sulfur batteries were selected because of their advanced design nature and the high level of interest in these two technologies. Lead acid batteries were included to establish a baseline representative of a more mature technology.

  8. Baseline Library

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links Marketing Resources Reports, Publications, and Research Agricultural Commercial Consumer Products Industrial Institutional Multi-Sector Residential...

  9. Integrated Waste Treatment Unit GFSI Risk Management Plan

    SciTech Connect (OSTI)

    W. A. Owca

    2007-06-21

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

  10. Procurement Integrity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---...Chapter 3.1 (Dec 2015) 1 Procurement Integrity Reference: 41 U.S.C. 423, FAR 3.104, DEAR 903.104 Overview This section discusses the requirements ...

  11. Baseline design/economics for advanced Fischer-Tropsch technology. Auarterly report, July--September 1992

    SciTech Connect (OSTI)

    1992-12-31

    The objectives of this study are to: Develop a baseline design for indirect liquefaction using advanced F-T technology; prepare the capital and operating costs for the baseline design; and develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide and evaluate its ongoing and future research and commercialisation programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks: Task 1, establish the baseline design and alternatives; Task 2, evaluate baseline economics; Task 3: Develop engineering design criteria; Task 4, develop a process flowsheet simulation (PFS) model; Task 5, perform sensitivity studies using the PFS model; Task 6, document the PFS model and develop a DOE training session on its use; Task 7, perform project management, technical coordination and other miscellaneous support functions. During the reporting period work progressed on Tasks 1, 4 and 7. This report covers work done during the period and consists of five sections: Introduction and summary; preliminary design for syngas production; Task 1, preliminary F-T reaction loop design; Task 1, development of a process simulation model; Task 4, key personnel staffing report, Task 7.

  12. Market Engagement Overview - 2015 BTO Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Market Engagement Overview - 2015 BTO Peer Review Market Engagement Overview - 2015 BTO Peer Review Presenter: Kristen Taddonio, U.S. Department of Energy View the Presentation PDF icon Market Engagement Overview - 2015 BTO Peer Review More Documents & Publications Commercial Buildings Integration Program Overview - 2015 BTO Peer Review CBEI: Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings - 2015 Peer Review CBEI: Using DOE Tools - 2015 Peer Review

  13. Borehole temperatures and a baseline for 20th-century global warming estimates

    SciTech Connect (OSTI)

    Harris, R.N.; Chapman, D.S.

    1997-03-14

    Lack of a 19th-century baseline temperature against which 20th-century warming can be referenced constitutes a deficiency in understanding recent climate change. Combination of borehole temperature profiles, which contain a memory of surface temperature changes in previous centuries, with the meteorologicl archive of surface air temperatures can provide a 19th-century baseline temperature tied to the current observational record. A test case in Utah, where boreholes are interspersed with meteorological stations belonging to the Historical Climatological network, Yields a noise reduction in estimates of 20th-century warming and a baseline temperature that is 0.6{degrees} {+-} 0.1{degrees}C below the 1951 to 1970 mean temperature for the region. 22 refs., 3 figs., 1 tab.

  14. Understanding the Effect of Baseline Modeling Implementation Choices on Analysis of Demand Response Performance

    SciTech Connect (OSTI)

    University of California, Berkeley; Addy, Nathan; Kiliccote, Sila; Mathieu, Johanna; Callaway, Duncan S.

    2012-06-13

    Accurate evaluation of the performance of buildings participating in Demand Response (DR) programs is critical to the adoption and improvement of these programs. Typically, we calculate load sheds during DR events by comparing observed electric demand against counterfactual predictions made using statistical baseline models. Many baseline models exist and these models can produce different shed calculations. Moreover, modelers implementing the same baseline model can make different modeling implementation choices, which may affect shed estimates. In this work, using real data, we analyze the effect of different modeling implementation choices on shed predictions. We focused on five issues: weather data source, resolution of data, methods for determining when buildings are occupied, methods for aligning building data with temperature data, and methods for power outage filtering. Results indicate sensitivity to the weather data source and data filtration methods as well as an immediate potential for automation of methods to choose building occupied modes.

  15. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, July--September 1994

    SciTech Connect (OSTI)

    1994-12-31

    This report is Bechtel`s twelfth quarterly technical progress report and covers the period of July through September, 1994. All major tasks associated with the contract study have essentially been completed. Effort is under way in preparing various topical reports for publication. The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases win be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model; establish the baseline design and alternatives; evaluate baseline and alternative economics; develop engineering design criteria; develop a process flowsheet simulation (PFS) model; perform sensitivity studies using the PFS model; document the PFS model and develop a DOE training session on its use; and perform project management, technical coordination and other miscellaneous support functions. Tasks 1, 2, 3 and 5 have essentially been completed. Effort is under way in preparing topical reports for publication. During the current reporting period, work progressed on Tasks 4, 6 and 7. This report covers work done during this period and consists of four sections: Introduction and Summary; Task 4 - Process Flowsheet Simulation (PFS) Model and Conversion to ASPEN PLUS; Task 6 - Document the PFS model and develop a DOE training session on its use; and Project Management and Staffing Report.

  16. 2010-06 "Budget Priorities for FY'12 and Baseline Change Proposal with

    Office of Environmental Management (EM)

    Future Budgets at LANL" | Department of Energy 6 "Budget Priorities for FY'12 and Baseline Change Proposal with Future Budgets at LANL" 2010-06 "Budget Priorities for FY'12 and Baseline Change Proposal with Future Budgets at LANL" The intent of this recommendation is to provide LASO with the priorities, which the NNMCAB believes are important to the citizens of Northern New Mexico in the large program to clean up the legacy waste at LANL. PDF icon Rec 2010-06

  17. DOE Announces Webinars on the Mid-Atlantic Baseline Study, EPA's Clean

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Plan and More | Department of Energy the Mid-Atlantic Baseline Study, EPA's Clean Power Plan and More DOE Announces Webinars on the Mid-Atlantic Baseline Study, EPA's Clean Power Plan and More November 13, 2015 - 8:30am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies, to training for the clean energy workforce. Webinars are free; however, advanced registration is typically required. You can

  18. 2008 CHP Baseline Assessment and Action Plan for the Nevada Market |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 08 CHP Baseline Assessment and Action Plan for the Nevada Market 2008 CHP Baseline Assessment and Action Plan for the Nevada Market The purpose of this report is to assess the current status of combined heat and power (CHP) in Nevada and to identify the hurdles that prevent the expanded use of CHP systems. The report summarizes the CHP "landscape" in Nevada, including the current installed base of CHP systems, the potential future CHP market, and the status of

  19. Rooftop Unit Suite: RTU Challenge, RTU Advanced Controls and RTU Smart Monitoring and Diagnostic System- 2013 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  20. HTGR-SC/C program baseline review meeting, Session IIC: circulators, C and I, and helium service

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    Information is presented concerning main and auxiliary circulators; reactor service equipment; and control and instrumentation systems.

  1. Readiness Review | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Readiness Assurance Readiness Assurance NNSA ensures that capabilities are in place to respond to any NNSA and Department of Energy facility emergency. It is also the nation's premier responder to any nuclear or radiological incident within the United States or abroad and provides operational planning and training to counter both

    Readiness Review The Ames Laboratory Readiness Review process provides strong support for Integrated Safety Management. Readiness Review is begun during initial

  2. Waste Isolation Pilot Plant Transuranic Waste Baseline inventory report. Volume 2. Revision 1

    SciTech Connect (OSTI)

    1995-02-01

    This document is the Baseline Inventory Report for the transuranic (alpha-bearing) wastes stored at the Waste Isolation Pilot Plant (WIPP) in New Mexico. Waste stream profiles including origin, applicable EPA codes, typical isotopic composition, typical waste densities, and typical rates of waste generation for each facility are presented for wastes stored at the WIPP.

  3. Notice of Intent to Revise DOE G 413.3-5A, Performance Baseline Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-02-03

    The proposed revision to this Department of Energy Guide focuses on updating the current guide with the latest terminology and references, regarding Performance Baseline Development process. This update also incorporates the latest Secretarial memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  4. Sandia National Laboratories/New Mexico Environmental Baseline update--Revision 1.0

    SciTech Connect (OSTI)

    1996-07-01

    This report provides a baseline update to provide the background information necessary for personnel to prepare clear and consise NEPA documentation. The environment of the Sandia National Laboratories is described in this document, including the ecology, meteorology, climatology, seismology, emissions, cultural resources and land use, visual resources, noise pollution, transportation, and socioeconomics.

  5. Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting: Preprint

    SciTech Connect (OSTI)

    Zhang, Jie; Hodge, Bri-Mathias; Lu, Siyuan; Hamann, Hendrik F.; Lehman, Brad; Simmons, Joseph; Campos, Edwin; Banunarayanan, Venkat

    2015-08-05

    Accurate solar power forecasting allows utilities to get the most out of the solar resources on their systems. To truly measure the improvements that any new solar forecasting methods can provide, it is important to first develop (or determine) baseline and target solar forecasting at different spatial and temporal scales. This paper aims to develop baseline and target values for solar forecasting metrics. These were informed by close collaboration with utility and independent system operator partners. The baseline values are established based on state-of-the-art numerical weather prediction models and persistence models. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of solar power output. forecasting metrics. These were informed by close collaboration with utility and independent system operator partners. The baseline values are established based on state-of-the-art numerical weather prediction models and persistence models. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of solar power output.

  6. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, April--June 1992

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    Effective September 26, 1991, Bechtel, with Amoco as the main subcontractor, initiated a study to develop a computer model and baseline design for advanced Fischer-Tropsch (F-T) technology for the US Department of Energy`s Pittsburgh Energy Technology Center (PETC). The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced F-T technology; prepare the capital and operating costs for the baseline design; and develop a process flow sheet simulation (PI-S) model. The baseline design, the economic analysis, and the computer model win be the major research planning tools that PETC will use to plan, guide, and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction. for the manufacture of synthetic liquid fuels from coal. This report is Bechtel`s third quarterly technical progress report covering the period from March 16, 1992 through June 21, 1992. This report consists of seven sections: Section 1 - introduction; Section 2 - summary; Section 3 - carbon dioxide removal tradeoff study; Section 4 - preliminary plant designs for coal preparation; Section 5 - preliminary design for syngas production; Section 6 - Task 3 - engineering design criteria; and Section 7 - project management.

  7. Baseline Risk Assessment for the F-Area Burning/Rubble Pits and Rubble Pit

    SciTech Connect (OSTI)

    Palmer, E.

    1996-03-01

    This document provides an overview of the Savannah River Site (SRS) and a description of the F-Area Burning/Rubble Pits (BRPs) and Rubble Pit (RP) unit. It also describes the objectives and scope of the baseline risk assessment (BRA).

  8. Role of Smarter Grids in Variable Renewable Resource Integration (Presentation)

    SciTech Connect (OSTI)

    Miller, M.

    2012-07-01

    This presentation discusses the role of smarter grids in variable renewable resource integration and references material from a forthcoming ISGAN issue paper: Smart Grid Contributions to Variable Renewable Resource Integration, co-written by the presenter and currently in review.

  9. Waste Treatment Plant External Independent Review, Office of River Protection, Richland

    Broader source: Energy.gov [DOE]

    External Independent Review (EIR).  On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will lead the site visit for the first phase of the WTP Baseline Change...

  10. Technology Integration Overview | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    ti_0_smith.pdf More Documents & Publications EPAct State and Alternative Fuel Provider Fleets Technology Integration Overview Vehicle Technologies Office Merit Review 2014: EPAct State and Alternative Fuel Transportation Program

  11. Secretarial Policy Statement on Scientific Integrity

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-06-02

    This Secretarial policy statement is intended to enhance our culture by establishing a unified framework for scientific integrity. This policy applies to all DOE Federal employees. This policy will be reviewed annually. Does not cancel/supersede other directives.

  12. Beyond Compliance: Integrating Nonproliferation into Corporate Sustainability

    SciTech Connect (OSTI)

    Hund, Gretchen; Kurzrok, Andrew J.

    2013-06-01

    This paper investigates nonproliferation as a potential corporate sustainability value. It reviews the history of corporate sustainability, builds the case for nonproliferation as a sustainability value, and develops recommendations for the integration of nonproliferation into the frameworks of sustainability.

  13. Pilot Integrated Cellulosic Biorefinery Operations to Fuel Ethanol

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office(BETO) IBR Project Peer Review * 2015 ICM, Inc. All Rights Reserved. *1 Recovery ... All Rights Reserved. Project Relevance and Outcomes Demonstrate Fully Integrated ...

  14. Stochastic Joint Inversion for Integrated Data Interpretation in Geothermal Exploration

    Broader source: Energy.gov [DOE]

    Stochastic Joint Inversion for Integrated Data Interpretation in Geothermal Exploration presentation at the April 2013 peer review meeting held in Denver, Colorado.

  15. Demonstrations of Integrated Advanced Rooftop Unit Controls and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Demonstrations of Integrated Advanced Rooftop Unit Controls and Automated Fault ... and RTU Smart Monitoring and Diagnostic System - 2013 BTO Peer Review Rooftop Unit ...

  16. Integration of Novel Flux Coupling Motor and Current Source Inverter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Current Source Inverters for HEVs and FCVs Vehicle Technologies Office Merit Review 2014: Wireless Charging Integration of Novel Flux Coupling Motor ...

  17. Development of High-Capacity Cathode Materials with Integrated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Development of High-Capacity Cathode Materials with Integrated Structures Vehicle Technologies Office Merit Review 2015: Design and Evaluation of High...

  18. External Independent Review (EIR) Standard Operating Procedure (SOP)

    Energy Savers [EERE]

    September 2010 | Department of Energy External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010 External Independent Reviews (EIRs) are conducted in order to validate the Performance Baseline of the project. The purpose is to provide the Acquisition Executive and senior leadership within the Department of Energy, as well as Congress confidence, with minimal bias, that the project can

  19. Building Energy Modeling Library - 2013 BTO Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Library - 2013 BTO Peer Review Building Energy Modeling Library - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review PDF icon commlbldgs03_franconi_040213.pdf More Documents & Publications Technology Performance Exchange - 2013 BTO Peer Review Whole Building Performance-Based Procurement Training Autotune - 2013 BTO Peer Review

  20. RADIATION INTEGRATOR

    DOE Patents [OSTI]

    Glass, F.M.; Wilson, H.N.

    1959-02-17

    Radiation detecting and measuring systems, particularly a compact, integrating, background monitor, are discussed. One of the principal features of the system is the use of an electrometer tube where the input of the tube is directly connected to an electrode of the radiation detector and a capacitor is coupled to the tube input. When a predetermined quantity of radiation has been integrated, a trigger signal is fed to a recorder and a charge is delivered to the capacitor to render the tube inoperative. The capacitor is then recharged for the next period of operation. With this arrangement there is a substantial reduction in lead lengths and the principal components may be enclosed and hermetically sealed to insure low leakage.

  1. RCRA Facility Investigation/Remedial Investigation Report with the Baseline Risk Assessment for the 716-A Motor Shops Seepage Basin

    SciTech Connect (OSTI)

    Palmer, E.

    1997-08-25

    This document describes the RCRA Facility Investigation/Remedial Investigation/Baseline Risk Assessment of the 716-A Motor Shops Seepage Basin.

  2. EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and The Over Target Schedule (OTS) Implementations

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) covers Over Target Baseline and Over Target Schedule implementations.

  3. Long-Baseline Neutrino Experiment (LBNE)Conceptual Design ReportThe LBNE Water Cherenkov DetectorApril 13 2012

    SciTech Connect (OSTI)

    Kettell S. H.; Bishai, M.; Brown, R.; Chen, H.; Diwan, M.; Dolph, J., Geronimo, G.; Gill, R.; Hackenburg, R.; Hahn, R.; Hans, S.; Isvan, Z.; Jaffe, D.; Junnarkar, S.; Kettell, S.H.; Lanni,F.; Li, Y.; Ling, J.; Littenberg, L.; Makowiecki, D.; Marciano, W.; Morse, W.; Parsa, Z.; Radeka, V.; Rescia, S.; Samios, N.; Sharma, R.; Simos, N.; Sondericker, J.; Stewart, J.; Tanaka, H.; Themann, H.; Thorn, C.; Viren, B., White, S.; Worcester, E.; Yeh, M.; Yu, B.; Zhang, C.

    2012-04-13

    Conceptual Design Report (CDR) developed for the Water Cherekov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  4. Emerging Technologies Program Overview - 2013 BTO Peer Review | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 3 BTO Peer Review Emerging Technologies Program Overview - 2013 BTO Peer Review An overview of BTO's Emerging Technologies program as presented at the 2013 Peer Review. PDF icon et_overview_phelan_040213.pdf More Documents & Publications Prioritization Tool - 2013 BTO Peer Review Advanced Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review Develop Standard Method of Test for Integrated Heat Pump - 2013

  5. Integration of High-Temperature Gas-Cooled Reactors into Industrial Process Applications

    SciTech Connect (OSTI)

    Lee Nelson

    2011-09-01

    This report is a summary of analyses performed by the NGNP project to determine whether it is technically and economically feasible to integrate high temperature gas cooled reactor (HTGR) technology into industrial processes. To avoid an overly optimistic environmental and economic baseline for comparing nuclear integrated and conventional processes, a conservative approach was used for the assumptions and calculations.

  6. Special Issue On Estimation Of Baselines And Leakage In CarbonMitigation Forestry Projects

    SciTech Connect (OSTI)

    Sathaye, Jayant A.; Andrasko, Kenneth

    2006-06-01

    There is a growing acceptance that the environmentalbenefits of forests extend beyond traditional ecological benefits andinclude the mitigation of climate change. Interest in forestry mitigationactivities has led to the inclusion of forestry practices at the projectlevel in international agreements. Climate change activities place newdemands on participating institutions to set baselines, establishadditionality, determine leakage, ensure permanence, and monitor andverify a project's greenhouse gas benefits. These issues are common toboth forestry and other types of mitigation projects. They demandempirical evidence to establish conditions under which such projects canprovide sustained long term global benefits. This Special Issue reportson papers that experiment with a range of approaches based on empiricalevidence for the setting of baselines and estimation of leakage inprojects in developing Asia and Latin America.

  7. Free-piston Stirling engine experimental program: Part 1. Baseline test summary

    SciTech Connect (OSTI)

    Berggren, R.; Moynihan, T.

    1983-06-01

    Free-Piston Stirling Engine experimental data are presented from a series of tests that establish the operating characteristics of the engine and determine performance repeatability. The operating envelope of the engine was to determine maximum parameter range and repeatability. Tests were then carried out in which individual operating parameters were varied while others were maintained constant. These data establish the baseline operation of the engine as a preliminary to a series of tests in which several suspected sources of energy loss are investigated by changing the engine geometry to isolate and magnify each suspected loss mechanism. Performance with the geometry change is compared against baseline operation to quantify the magnitude of the loss mechanism under investigation. The results of the loss mechanism investigation are presented in Part 2 of this report.

  8. High-Level software requirements specification for the TWRS controlled baseline database system

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    This Software Requirements Specification (SRS) is an as-built document that presents the Tank Waste Remediation System (TWRS) Controlled Baseline Database (TCBD) in its current state. It was originally known as the Performance Measurement Control System (PMCS). Conversion to the new system name has not occurred within the current production system. Therefore, for simplicity, all references to TCBD are equivalent to PMCS references. This SRS will reference the PMCS designator from this point forward to capture the as-built SRS. This SRS is written at a high-level and is intended to provide the design basis for the PMCS. The PMCS was first released as the electronic data repository for cost, schedule, and technical administrative baseline information for the TAAS Program. During its initial development, the PMCS was accepted by the customer, TARS Business Management, with no formal documentation to capture the initial requirements.

  9. Baseline point source load inventory, 1985. 1991 reevaluation report No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-02-04

    The report finalizes and documents the Chesapeake Bay Agreement states' 1985 point source nutrient load estimates initially presented in the Baywide Nutrient Reduction Strategy (BNRS). The Bay Agreement states include Maryland, Virginia, Pennsylvania, and the District of Columbia. Each of the states final, annual, discharged, 1985 point source total phosphorus and total nitrogen nutrient load estimates are presented. These estimates are to serve as the point source baseline for the year 2000 40% nutrient reduction goal. Facility by facility flows, nutrient concentrations and nutrient loads for 1985 from above the fall line (AFL) and from below the fall line (BFL) are presented. The report presents the percent change in the 1985 baseline loads for each of the Bay agreement states relative to 1991. Estimates of 1991 nutrient loads are not available for non-agreement states at this time.

  10. Level 3 Baseline Risk Assessment for Building 3515 at Oak Ridge National Lab., Oak Ridge, TN

    SciTech Connect (OSTI)

    Wollert, D.A.; Cretella, F.M.; Golden, K.M.

    1995-08-01

    The baseline risk assessment for the Fission Product Pilot Plant (Building 3515) at the Oak Ridge National laboratory (ORNL) provides the Decontamination and Decommissioning (D&D) Program at ORNL and Building 3515 project managers with information concerning the results of the Level 3 baseline risk assessment performed for this building. The document was prepared under Work Breakdown Structure 1.4.12.6.2.01 (Activity Data Sheet 3701, Facilities D&D) and includes information on the potential long-term impacts to human health and the environment if no action is taken to remediate Building 3515. Information provided in this document forms the basis for the development of remedial alternatives and the no-action risk portion of the Engineering Evaluation/Cost Analysis report.

  11. Multi-Function Fuel-Fired Heat Pump - 2013 Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review Working Fluids Low Global Warming Potential Refrigerants - 2013 Peer Review Buildings Performance ...

  12. Results from baseline tests of the SPRE I and comparison with code model predictions

    SciTech Connect (OSTI)

    Cairelli, J.E.; Geng, S.M.; Skupinski, R.C.

    1994-09-01

    The Space Power Research Engine (SPRE), a free-piston Stirling engine with linear alternator, is being tested at the NASA Lewis Research Center as part of the Civil Space Technology Initiative (CSTI) as a candidate for high capacity space power. This paper presents results of base-line engine tests at design and off-design operating conditions. The test results are compared with code model predictions.

  13. Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting: Preprint

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting Preprint Jie Zhang 1 , Bri-Mathias Hodge 1 , Siyuan Lu 2 , Hendrik F. Hamann 2 , Brad Lehman 3 , Joseph Simmons 4 , Edwin Campos 5 , and Venkat Banunarayanan 6 1 National Renewable Energy Laboratory 2 IBM TJ Watson Research Center 3 Northeastern University 4 University of Arizona 5 Argonne National Laboratory 6 U.S. Department of Energy Presented at the IEEE Power and Energy Society General Meeting Denver,

  14. Tank waste remediation system retrieval and disposal mission initial updated baseline summary

    SciTech Connect (OSTI)

    Swita, W.R.

    1998-01-09

    This document provides a summary of the Tank Waste Remediation System (TWRS) Retrieval and Disposal Mission Initial Updated Baseline (scope, schedule, and cost), developed to demonstrate Readiness-to-Proceed (RTP) in support of the TWRS Phase 1B mission. This Updated Baseline is the proposed TWRS plan to execute and measure the mission work scope. This document and other supporting data demonstrate that the TWRS Project Hanford Management Contract (PHMC) team is prepared to fully support Phase 1B by executing the following scope, schedule, and cost baseline activities: Deliver the specified initial low-activity waste (LAW) and high-level waste (HLW) feed batches in a consistent, safe, and reliable manner to support private contractors` operations starting in June 2002; Deliver specified subsequent LAW and HLW feed batches during Phase 1B in a consistent, safe, and reliable manner; Provide for the interim storage of immobilized HLW (IHLW) products and the disposal of immobilized LAW (ILAW) products generated by the private contractors; Provide for disposal of byproduct wastes generated by the private contractors; and Provide the infrastructure to support construction and operations of the private contractors` facilities.

  15. Some Beam Dynamics and Related Studies of Possible Changes to the ILC Baseline Design

    SciTech Connect (OSTI)

    Paterson, Ewan; /SLAC

    2012-04-03

    Since the completion of the ILC Reference Design Report (RDR) in 2007, global R and D has continued on all ILC systems in a coordinated program titled Technical Design Phase 1. This program, which is planned and coordinated by the Program Managers and the Technical Area Group Leaders, will transition to a Phase 2 in 2010 which has the goal of producing a more complete Technical Design Report in 2012. In this transition there will be a re-baseline process which will update and or modify the RDR baseline design taking into account progress with systems design and progress with various technologies coming from the continuing R and D programs. The RDR design was considered by some to be a conservative one and many of the topics being studied for inclusion in a new baseline are directed towards more optimum cost versus risk designs. Some of these are engineering systems design modifications, both technical and civil, while others are accelerator parameters, technical system designs and beam dynamics optimizations. A few of the latter are described here.

  16. The impact of sterile neutrinos on CP measurements at long baselines

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Gandhi, Raj; Kayser, Boris; Masud, Mehedi; Prakash, Suprabh

    2015-09-01

    With the Deep Underground Neutrino Experiment (DUNE) as an example, we show that the presence of even one sterile neutrino of mass ~1 eV can significantly impact the measurements of CP violation in long baseline experiments. Using a probability level analysis and neutrino-antineutrino asymmetry calculations, we discuss the large magnitude of these effects, and show how they translate into significant event rate deviations at DUNE. These results demonstrate that measurements which, when interpreted in the context of the standard three family paradigm, indicate CP conservation at long baselines, may, in fact hide large CP violation if there is a sterilemore » state. Similarly, any data indicating the violation of CP cannot be properly interpreted within the standard paradigm unless the presence of sterile states of mass O(1 eV) can be conclusively ruled out. Our work underscores the need for a parallel and linked short baseline oscillation program and a highly capable near detector for DUNE, but in order that its highly anticipated results on CP violation in the lepton sector may be correctly interpreted.« less

  17. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-06-20

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  18. Quadrennial Energy Review

    U.S. Energy Information Administration (EIA) Indexed Site

    QUADRENNIAL ENERGY REVIEW Melanie Kenderdine 2015 EIA Energy Conference Washington, DC June 16, 2015 ENERGY TRANSMISSION, STORAGE, AND DISTRIBUTION INFRASTRUCTURE INTEGRATED APPROACH An Unconventional Look at Energy Systems  The United States has one of the most advanced energy systems in the world  The energy transmission, storage, and distribution (TS&D) infrastructure is increasingly complex and interdependent  It must handle demanding system requirements (e.g., 24/365,

  19. ACCELERATION INTEGRATOR

    DOE Patents [OSTI]

    Pope, K.E.

    1958-01-01

    This patent relates to an improved acceleration integrator and more particularly to apparatus of this nature which is gyrostabilized. The device may be used to sense the attainment by an airborne vehicle of a predetermined velocitv or distance along a given vector path. In its broad aspects, the acceleration integrator utilizes a magnetized element rotatable driven by a synchronous motor and having a cylin drical flux gap and a restrained eddy- current drag cap deposed to move into the gap. The angular velocity imparted to the rotatable cap shaft is transmitted in a positive manner to the magnetized element through a servo feedback loop. The resultant angular velocity of tae cap is proportional to the acceleration of the housing in this manner and means may be used to measure the velocity and operate switches at a pre-set magnitude. To make the above-described dcvice sensitive to acceleration in only one direction the magnetized element forms the spinning inertia element of a free gyroscope, and the outer housing functions as a gimbal of a gyroscope.

  20. Synthesis and Comparison of Baseline Avian and Bat Use, Raptor Nesting and Mortality Information from Proposed and Existing Wind Developments: Final Report.

    SciTech Connect (OSTI)

    Erickson, Wallace P.

    2002-12-01

    Primarily due to concerns generated from observed raptor mortality at the Altamont Pass (CA) wind plant, one of the first commercial electricity generating wind plants in the U.S., new proposed wind projects both within and outside of California have received a great deal of scrutiny and environmental review. A large amount of baseline and operational monitoring data have been collected at proposed and existing U.S. wind plants. The primary use of the avian baseline data collected at wind developments has been to estimate the overall project impacts (e.g., very low, low, moderate, and high relative mortality) on birds, especially raptors and sensitive species (e.g., state and federally listed species). In a few cases, these data have also been used for guiding placement of turbines within a project boundary. This new information has strengthened our ability to accurately predict and mitigate impacts from new projects. This report should assist various stakeholders in the interpretation and use of this large information source in evaluating new projects. This report also suggests that the level of baseline data (e.g., avian use data) required to adequately assess expected impacts of some projects may be reduced. This report provides an evaluation of the ability to predict direct impacts on avian resources (primarily raptors and waterfowl/waterbirds) using less than an entire year of baseline avian use data (one season, two seasons, etc.). This evaluation is important because pre-construction wildlife surveys can be one of the most time-consuming aspects of permitting wind power projects. For baseline data, this study focuses primarily on standardized avian use data usually collected using point count survey methodology and raptor nest survey data. In addition to avian use and raptor nest survey data, other baseline data is usually collected at a proposed project to further quantify potential impacts. These surveys often include vegetation mapping and state or federal sensitive-status wildlife and plant surveys if there is a likelihood of these species occurring in the vicinity of the project area. This report does not address these types of surveys, however, it is assumed in this document that those surveys are conducted when appropriate to help further quantify potential impacts. The amount and extent of ecological baseline data to collect at a wind project should be determined on a case-by-case basis. The decision should use information gained from this report, recent information from new projects (e.g., Stateline OR/WA), existing project site data from agencies and other knowledgeable groups/individuals, public scoping, and results of vegetation and habitat mapping. Other factors that should also be considered include the likelihood of the presence of sensitive species at the site and expected impacts to those species, project size and project layout.

  1. NREL: Energy Systems Integration - Systems Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    High-level system integration New distribution scenarios such as household DC systems and residential-scale generation and storage integrated with home energy management systems. ...

  2. Commercial Buildings Integration (CBI)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Arah Schuur Program Manager Commercial Buildings Integration (CBI) April 22, 2014 Commercial Buildings Integration (CBI) 2 Commercial Buildings Integration (CBI) Mission...

  3. Independent technical review, handbook

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  4. Evaluation of metrics and baselines for tracking greenhouse gas emissions trends: Recommendations for the California climate action registry

    SciTech Connect (OSTI)

    Price, Lynn; Murtishaw, Scott; Worrell, Ernst

    2003-06-01

    Executive Summary: The California Climate Action Registry, which was initially established in 2000 and began operation in Fall 2002, is a voluntary registry for recording annual greenhouse gas (GHG) emissions. The purpose of the Registry is to assist California businesses and organizations in their efforts to inventory and document emissions in order to establish a baseline and to document early actions to increase energy efficiency and decrease GHG emissions. The State of California has committed to use its ''best efforts'' to ensure that entities that establish GHG emissions baselines and register their emissions will receive ''appropriate consideration under any future international, federal, or state regulatory scheme relating to greenhouse gas emissions.'' Reporting of GHG emissions involves documentation of both ''direct'' emissions from sources that are under the entity's control and indirect emissions controlled by others. Electricity generated by an off-site power source is consider ed to be an indirect GHG emission and is required to be included in the entity's report. Registry participants include businesses, non-profit organizations, municipalities, state agencies, and other entities. Participants are required to register the GHG emissions of all operations in California, and are encouraged to report nationwide. For the first three years of participation, the Registry only requires the reporting of carbon dioxide (CO2) emissions, although participants are encouraged to report the remaining five Kyoto Protocol GHGs (CH4, N2O, HFCs, PFCs, and SF6). After three years, reporting of all six Kyoto GHG emissions is required. The enabling legislation for the Registry (SB 527) requires total GHG emissions to be registered and requires reporting of ''industry-specific metrics'' once such metrics have been adopted by the Registry. The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) was asked to provide technical assistance to the California Energy Commission (Energy Commission) related to the Registry in three areas: (1) assessing the availability and usefulness of industry-specific metrics, (2) evaluating various methods for establishing baselines for calculating GHG emissions reductions related to specific actions taken by Registry participants, and (3) establishing methods for calculating electricity CO2 emission factors. The third area of research was completed in 2002 and is documented in Estimating Carbon Dioxide Emissions Factors for the California Electric Power Sector (Marnay et al., 2002). This report documents our findings related to the first areas of research. For the first area of research, the overall objective was to evaluate the metrics, such as emissions per economic unit or emissions per unit of production that can be used to report GHG emissions trends for potential Registry participants. This research began with an effort to identify methodologies, benchmarking programs, inventories, protocols, and registries that u se industry-specific metrics to track trends in energy use or GHG emissions in order to determine what types of metrics have already been developed. The next step in developing industry-specific metrics was to assess the availability of data needed to determine metric development priorities. Berkeley Lab also determined the relative importance of different potential Registry participant categories in order to asses s the availability of sectoral or industry-specific metrics and then identified industry-specific metrics in use around the world. While a plethora of metrics was identified, no one metric that adequately tracks trends in GHG emissions while maintaining confidentiality of data was identified. As a result of this review, Berkeley Lab recommends the development of a GHG intensity index as a new metric for reporting and tracking GHG emissions trends.Such an index could provide an industry-specific metric for reporting and tracking GHG emissions trends to accurately reflect year to year changes while protecting proprietary data. This GHG intensity index changes while protecting proprietary data. This GHG intensity index would provide Registry participants with a means for demonstrating improvements in their energy and GHG emissions per unit of production without divulging specific values. For the second research area, Berkeley Lab evaluated various methods used to calculate baselines for documentation of energy consumption or GHG emissions reductions, noting those that use industry-specific metrics. Accounting for actions to reduce GHGs can be done on a project-by-project basis or on an entity basis. Establishing project-related baselines for mitigation efforts has been widely discussed in the context of two of the so-called ''flexible mechanisms'' of the Kyoto Protocol to the United Nations Framework Convention on Climate Change (Kyoto Protocol) Joint Implementation (JI) and the Clean Development Mechanism (CDM).

  5. Agent review phase one report.

    SciTech Connect (OSTI)

    Zubelewicz, Alex Tadeusz; Davis, Christopher Edward; Bauer, Travis LaDell

    2009-12-01

    This report summarizes the findings for phase one of the agent review and discusses the review methods and results. The phase one review identified a short list of agent systems that would prove most useful in the service architecture of an information management, analysis, and retrieval system. Reviewers evaluated open-source and commercial multi-agent systems and scored them based upon viability, uniqueness, ease of development, ease of deployment, and ease of integration with other products. Based on these criteria, reviewers identified the ten most appropriate systems. The report also mentions several systems that reviewers deemed noteworthy for the ideas they implement, even if those systems are not the best choices for information management purposes.

  6. Appendix A - GPRA06 benefits estimates: MARKAL and NEMS model baseline cases

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    NEMS is an integrated energy model of the U.S. energy system developed by the Energy Information Administration (EIA) for forecasting and policy analysis purposes.

  7. Estimating baseline risks from biouptake and food ingestion at a contaminated site

    SciTech Connect (OSTI)

    MacDonell, M.; Woytowich, K.; Blunt, D.; Picel, M.

    1993-11-01

    Biouptake of contaminants and subsequent human exposure via food ingestion represents a public concern at many contaminated sites. Site-specific measurements from plant and animal studies are usually quite limited, so this exposure pathway is often modeled to assess the potential for adverse health effects. A modeling tool was applied to evaluate baseline risks at a contaminated site in Missouri, and the results were used to confirm that ingestion of fish and game animals from the site area do not pose a human health threat. Results were also used to support the development of cleanup criteria for site soil.

  8. A comparison of baseline aerodynamic performance of optimally-twisted versus non-twisted HAWT blades

    SciTech Connect (OSTI)

    Simms, D.A.; Robinson, M.C.; Hand, M.M.; Fingersh, L.J.

    1995-01-01

    NREL has completed the initial twisted blade field tests of the ``Unsteady Aerodynamics Experiment.`` This test series continues systematic measurements of unsteady aerodynamic phenomena prevalent in stall-controlled horizontal axis wind turbines (HAWTs). The blade twist distribution optimizes power production at a single angle of attack along the span. Abrupt transitions into and out of stall are created due to rapid changes in inflow. Data from earlier experiments have been analyzed extensively to characterize the steady and unsteady response of untwisted blades. In this report, a characterization and comparison of the baseline aerodynamic performance of the twisted versus non-twisted blade sets will be presented for steady flow conditions.

  9. Formation and Sustainment of ITPs in ITER with the Baseline Heating Mix

    SciTech Connect (OSTI)

    Francesca M. Poli and Charles Kessel

    2012-12-03

    Plasmas with internal transport barriers (ITBs) are a potential and attractive route to steady-state operation in ITER. These plasmas exhibit radially localized regions of improved con nement with steep pressure gradients in the plasma core, which drive large bootstrap current and generate hollow current pro les and negative shear. This work examines the formation and sustainment of ITBs in ITER with electron cyclotron heating and current drive. It is shown that, with a trade-o of the power delivered to the equatorial and to the upper launcher, the sustainment of steady-state ITBs can be demonstrated in ITER with the baseline heating con guration.

  10. Final Report. Baseline LAW Glass Formulation Testing, VSL-03R3460-1, Rev. 0

    SciTech Connect (OSTI)

    Muller, Isabelle S.; Pegg, Ian L.; Gan, Hao; Buechele, Andrew; Rielley, Elizabeth; Bazemore, Gina; Cecil, Richard; Hight, Kenneth; Mooers, Cavin; Lai, Shan-Tao T.; Kruger, Albert A.

    2015-06-18

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  11. Baseline Risk Assessment Supporting Closure at Waste Management Area C at the Hanford Site Washington

    SciTech Connect (OSTI)

    Singleton, Kristin M.

    2015-01-07

    The Office of River Protection under the U.S. Department of Energy is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C under the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO). A baseline risk assessment (BRA) of current conditions is based on available characterization data and information collected at WMA C. The baseline risk assessment is being developed as a part of a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Corrective Measures Study (CMS) at WMA C that is mandatory under Comprehensive Environmental Response, Compensation, and Liability Act and RCRA corrective action. The RFI/CMS is needed to identify and evaluate the hazardous chemical and radiological contamination in the vadose zone from past releases of waste from WMA C. WMA C will be under Federal ownership and control for the foreseeable future, and managed as an industrial area with restricted access and various institutional controls. The exposure scenarios evaluated under these conditions include Model Toxics Control Act (MTCA) Method C, industrial worker, maintenance and surveillance worker, construction worker, and trespasser scenarios. The BRA evaluates several unrestricted land use scenarios (residential all-pathway, MTCA Method B, and Tribal) to provide additional information for risk management. Analytical results from 13 shallow zone (0 to 15 ft. below ground surface) sampling locations were collected to evaluate human health impacts at WMA C. In addition, soil analytical data were screened against background concentrations and ecological soil screening levels to determine if soil concentrations have the potential to adversely affect ecological receptors. Analytical data from 12 groundwater monitoring wells were evaluated between 2004 and 2013. A screening of groundwater monitoring data against background concentrations and Federal maximum concentration levels was used to determine vadose zone contamination impacts on groundwater. Waste Management Area C is the first of the Hanford tank farms to begin the closure planning process. The current baseline risk assessment will provide valuable information for making corrective actions and closure decisions for WMA C, and will also support the planning for future tank farm soil investigation and baseline risk assessments.

  12. Energy baseline and energy efficiency resource opportunities for the Forest Products Laboratory, Madison, Wisconsin

    SciTech Connect (OSTI)

    Mazzucchi, R.P.; Richman, E.E.; Parker, G.B.

    1993-08-01

    This report provides recommendations to improve the energy use efficiency at the Forest Products Laboratory in Madison, Wisconsin. The assessment focuses upon the four largest buildings and central heating plant at the facility comprising a total of approximately 287,000 square feet. The analysis is comprehensive in nature, intended primarily to determine what if any energy efficiency improvements are warranted based upon the potential for cost-effective energy savings. Because of this breadth, not all opportunities are developed in detail; however, baseline energy consumption data and energy savings concepts are described to provide a foundation for detailed investigation and project design where warranted.

  13. Environmental Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental-Review Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

  14. Document Reviews

    Broader source: Energy.gov [DOE]

    The Office of Document Reviews, within the Office of Health, Safety and Security information and document declassification efforts promote the release of information needed by an informed citizenry...

  15. NREL: Process Development and Integration Laboratory - Integrated

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurements and Characterization Capabilities Integrated Measurements and Characterization Capabilities The Integrated Measurements and Characterization cluster tool in the Process Development and Integration Laboratory offers powerful capabilities with integrated tools for measuring and characterizing photovoltaic materials and devices. Contact Pete Sheldon for more details on these capabilities. Basic Cluster Tool Capabilities Sample Handling Ultra-high-vacuum robot Transport pod: allows

  16. Residential Buildings Integration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2, 2013 Residential Buildings Integration Program Building Technologies Office ... Overview of the Residential Integration Program Research Implementation tools ...

  17. Baseline Environmental Analysis Report for the K-1251 Barge Facility at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Van Winkle J.E.

    2007-08-24

    This report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-1251 Barge Facility, which is located at the East Tennessee Technology Park (ETTP). DOE is proposing to lease the facility to the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the use, by a potential lessee, of government-owned facilities at ETTP. This report is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The lease footprint is slightly over 1 acre. The majority of the lease footprint is defined by a perimeter fence that surrounds a gravel-covered area with a small concrete pad within it. Also included is a gravel drive with locked gates at each end that extends on the east side to South First Avenue, providing access to the facility. The facility is located along the Clinch River and an inlet of the river that forms its southern boundary. To the east, west, and north, the lease footprint is surrounded by DOE property. Preparation of this report included the review of government records, title documents, historic aerial photos, visual and physical inspections of the property and adjacent properties, and interviews with current and former employees involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products or their derivatives and acutely hazardous wastes were known to have been released or disposed. Radiological surveys were conducted and chemical samples were collected to assess the facility's condition.

  18. EVMS Training Snippet: 3.1B IMS Monthly Review

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet sponsored by the Office of Project Management (PM) explores how to review monthly submittals of the integrated master schedule.

  19. Vehicle Technologies Office Merit Review 2015: High-Throughput...

    Office of Environmental Management (EM)

    Vehicle Technologies Office Merit Review 2015: High-Throughp... 2015 DOE Hydrogen and Fuel Cells Program and Vehicle ... Development for Fuel Efficient Small Car Integrated ...

  20. Proceedings of the 24th Seismic Research Review: Nuclear Explosion...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Explosion Monitoring: Innovation and Integration Citation Details In-Document Search Title: Proceedings of the 24th Seismic Research Review: Nuclear Explosion ...

  1. Vehicle Technologies Office Merit Review 2014: Development of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (AHSS) with an Integrated Experimental and Simulation Approach Vehicle Technologies Office Merit Review 2014: Development of 3rd Generation Advanced High Strength Steels (AHSS) ...

  2. Vehicle Technologies Office Merit Review 2014: Friction Reduction...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Vehicle Technologies Office Merit Review 2014: Can hard coatings and lubricant anti-wear additives work together? An integrated surface technology for...

  3. CBEI: Lessons Learned from Integrated Retrofits in Small and Medium Sized

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Buildings - 2015 Peer Review | Department of Energy Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings - 2015 Peer Review CBEI: Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings - 2015 Peer Review Presenter: Mark Stutman, PSU View the Presentation PDF icon CBEI: Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings - 2015 Peer Review More Documents & Publications

  4. Combination and Integration of DPF-SCR Aftertreatment Technologies |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon ace025_rappe_2012_o.pdf More Documents & Publications Combination and Integration of DPF-SCR Aftertreatment Technologies Combination & Integration of DPF-SCR Aftertreatment Technologies Combination & Integration of DPF-SCR Aftertreatment

  5. Combination and Integration of DPF-SCR Aftertreatment Technologies |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon ace025_rappe_2011_o.pdf More Documents & Publications Combination and Integration of DPF-SCR Aftertreatment Technologies Combination and Integration of DPF-SCR Aftertreatment Technologies Combination & Integration of DPF-SCR Aftertreatment Technologies

  6. Demonstrating and Deploying Integrated Retrofit Technologies and Solutions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - 2014 BTO Peer Review | Department of Energy Demonstrating and Deploying Integrated Retrofit Technologies and Solutions - 2014 BTO Peer Review Demonstrating and Deploying Integrated Retrofit Technologies and Solutions - 2014 BTO Peer Review Presenter: Mark Stutman, Consortium for Building Energy Innovation The Penn State Consortium for Building Energy Innovation focuses on the development, demonstration, and deployment of energy-saving technologies and solutions that can achieve 50% energy

  7. Better Buildings Alliance - 2013 BTO Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - 2013 BTO Peer Review Better Buildings Alliance - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review PDF icon commlbldgs05_taddonio_040213.pdf More Documents & Publications Lighting Energy Efficiency in Parking Campaign Building America System Research Rooftop Unit Suite: RTU Challenge, RTU Advanced Controls and RTU Smart Monitoring and Diagnostic System - 2013 BTO Peer Review

  8. Dynamic gating window for compensation of baseline shift in respiratory-gated radiation therapy

    SciTech Connect (OSTI)

    Pepin, Eric W.; Wu Huanmei; Shirato, Hiroki

    2011-04-15

    Purpose: To analyze and evaluate the necessity and use of dynamic gating techniques for compensation of baseline shift during respiratory-gated radiation therapy of lung tumors. Methods: Motion tracking data from 30 lung tumors over 592 treatment fractions were analyzed for baseline shift. The finite state model (FSM) was used to identify the end-of-exhale (EOE) breathing phase throughout each treatment fraction. Using duty cycle as an evaluation metric, several methods of end-of-exhale dynamic gating were compared: An a posteriori ideal gating window, a predictive trend-line-based gating window, and a predictive weighted point-based gating window. These methods were evaluated for each of several gating window types: Superior/inferior (SI) gating, anterior/posterior beam, lateral beam, and 3D gating. Results: In the absence of dynamic gating techniques, SI gating gave a 39.6% duty cycle. The ideal SI gating window yielded a 41.5% duty cycle. The weight-based method of dynamic SI gating yielded a duty cycle of 36.2%. The trend-line-based method yielded a duty cycle of 34.0%. Conclusions: Dynamic gating was not broadly beneficial due to a breakdown of the FSM's ability to identify the EOE phase. When the EOE phase was well defined, dynamic gating showed an improvement over static-window gating.

  9. Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)

    SciTech Connect (OSTI)

    J. H. Jackson; S. P. Teysseyre

    2012-02-01

    The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

  10. Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)

    SciTech Connect (OSTI)

    J. H. Jackson; S. P. Teysseyre

    2012-10-01

    The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

  11. Independent Oversight Review, Livermore Site Office - October 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Livermore Site Office - October 2011 Independent Oversight Review, Livermore Site Office - October 2011 October 2011 Review of Integrated Safety Management System Effectiveness at the Livermore Site Office This report provides the results of an independent oversight review of the effectiveness of the integrated safety management system at the Department of Energy's (DOE) Livermore Site Office. The review was conducted July 11-21, 2011, by the Office of Safety and

  12. Independent Oversight Review, Sodium Bearing Waste Treatment Project -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal - June 2012 | Department of Energy Sodium Bearing Waste Treatment Project - Federal - June 2012 Independent Oversight Review, Sodium Bearing Waste Treatment Project - Federal - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness

  13. External Independent Review (EIR) Report Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report Template External Independent Review (EIR) Report Template Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. An EIR typically results in both a Draft and Final EIR Report. Where follow-up actions are

  14. External Independent Review (EIR) Scoping Meeting Agreement Form |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Scoping Meeting Agreement Form External Independent Review (EIR) Scoping Meeting Agreement Form Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures

  15. Quarterly Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2009 Federal Columbia River Power System (FCRPS) FY 2009 FIRST QUARTER REVIEW Projection for FY 2009 Net Revenues and Reserves A B C D FY 2008 Audited Actuals without FAS 133 &...

  16. Energy Review

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    M iggl-003504t11l)sar Energy Review 8 M. IM W I -W All* r ;ai*i el I gi In this issue: Energy-related housing characteristics Propane-provider fleet survey Ordering...

  17. Etalon-induced baseline drift and correction in atom flux sensors based on atomic absorption spectroscopy

    SciTech Connect (OSTI)

    Du, Yingge; Chambers, Scott A.

    2014-10-20

    Atom flux sensors based on atomic absorption (AA) spectroscopy are of significant interest in thin film growth as they can provide unobtrusive, element specific real-time flux sensing and control. The ultimate sensitivity and performance of these sensors are strongly affected by baseline drift. Here we demonstrate that an etalon effect resulting from temperature changes in optical viewport housings is a major source of signal instability, which has not been previously considered, and cannot be corrected using existing methods. We show that small temperature variations in the fused silica viewports can introduce intensity modulations of up to 1.5% which in turn significantly deteriorate AA sensor performance. This undesirable effect can be at least partially eliminated by reducing the size of the beam and tilting the incident light beam off the viewport normal.

  18. Etalon-induced Baseline Drift And Correction In Atom Flux Sensors Based On Atomic Absorption Spectroscopy

    SciTech Connect (OSTI)

    Du, Yingge; Chambers, Scott A.

    2014-10-20

    Atom flux sensors based on atomic absorption (AA) spectroscopy are of significant interest in thin film growth as they can provide unobtrusive, element specific, real-time flux sensing and control. The ultimate sensitivity and performance of the sensors are strongly affected by the long-term and short term baseline drift. Here we demonstrate that an etalon effect resulting from temperature changes in optical viewport housings is a major source of signal instability which has not been previously considered or corrected by existing methods. We show that small temperature variations in the fused silica viewports can introduce intensity modulations of up to 1.5%, which in turn significantly deteriorate AA sensor performance. This undesirable effect can be at least partially eliminated by reducing the size of the beam and tilting the incident light beam off the viewport normal.

  19. Dual baseline search for muon antineutrino disappearance at 0.1 eV²

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Cheng, G.; Huelsnitz, W.; Aguilar-Arevalo, A. A.; Alcaraz-Aunion, J. L.; Brice, S. J.; Brown, B. C.; Bugel, L.; Catala-Perez, J.; Church, E. D.; Conrad, J. M.; et al

    2012-09-25

    The MiniBooNE and SciBooNE collaborations report the results of a joint search for short baseline disappearance of ν¯μ at Fermilab’s Booster Neutrino Beamline. The MiniBooNE Cherenkov detector and the SciBooNE tracking detector observe antineutrinos from the same beam, therefore the combined analysis of their data sets serves to partially constrain some of the flux and cross section uncertainties. Uncertainties in the νμ background were constrained by neutrino flux and cross section measurements performed in both detectors. A likelihood ratio method was used to set a 90% confidence level upper limit on ν¯μ disappearance that dramatically improves upon prior limits inmore »the Δm²=0.1–100 eV² region.« less

  20. Baseline scheme for polarization preservation and control in the MEIC ion complex

    SciTech Connect (OSTI)

    Derbenev, Yaroslav S.; Lin, Fanglei; Morozov, Vasiliy; Zhang, Yuhong; Kondratenko, Anatoliy; Kondratenko, M A; Filatov, Yury

    2015-09-01

    The scheme for preservation and control of the ion polarization in the Medium-energy Electron-Ion Collider (MEIC) has been under active development in recent years. The figure-8 configuration of the ion rings provides a unique capability to control the polarization of any ion species including deuterons by means of "weak" solenoids rotating the particle spins by small angles. Insertion of "weak" solenoids into the magnetic lattices of the booster and collider rings solves the problem of polarization preservation during acceleration of the ion beam. Universal 3D spin rotators designed on the basis of "weak" solenoids allow one to obtain any polarization orientation at an interaction point of MEIC. This paper presents the baseline scheme for polarization preservation and control in the MEIC ion complex.

  1. Baseline data for the residential sector and development of a residential forecasting database

    SciTech Connect (OSTI)

    Hanford, J.W.; Koomey, J.G.; Stewart, L.E.; Lecar, M.E.; Brown, R.E.; Johnson, F.X.; Hwang, R.J.; Price, L.K.

    1994-05-01

    This report describes the Lawrence Berkeley Laboratory (LBL) residential forecasting database. It provides a description of the methodology used to develop the database and describes the data used for heating and cooling end-uses as well as for typical household appliances. This report provides information on end-use unit energy consumption (UEC) values of appliances and equipment historical and current appliance and equipment market shares, appliance and equipment efficiency and sales trends, cost vs efficiency data for appliances and equipment, product lifetime estimates, thermal shell characteristics of buildings, heating and cooling loads, shell measure cost data for new and retrofit buildings, baseline housing stocks, forecasts of housing starts, and forecasts of energy prices and other economic drivers. Model inputs and outputs, as well as all other information in the database, are fully documented with the source and an explanation of how they were derived.

  2. Baseline for Climate Change: Modeling Watershed Aquatic Biodiversity Relative to Environmental and Anthropogenic Factors

    SciTech Connect (OSTI)

    Maurakis, Eugene G

    2010-10-01

    Objectives of the two-year study were to (1) establish baselines for fish and macroinvertebrate community structures in two mid-Atlantic lower Piedmont watersheds (Quantico Creek, a pristine forest watershed; and Cameron Run, an urban watershed, Virginia) that can be used to monitor changes relative to the impacts related to climate change in the future; (2) create mathematical expressions to model fish species richness and diversity, and macroinvertebrate taxa and macroinvertebrate functional feeding group taxa richness and diversity that can serve as a baseline for future comparisons in these and other watersheds in the mid-Atlantic region; and (3) heighten peoples awareness, knowledge and understanding of climate change and impacts on watersheds in a laboratory experience and interactive exhibits, through internship opportunities for undergraduate and graduate students, a week-long teacher workshop, and a website about climate change and watersheds. Mathematical expressions modeled fish and macroinvertebrate richness and diversity accurately well during most of the six thermal seasons where sample sizes were robust. Additionally, hydrologic models provide the basis for estimating flows under varying meteorological conditions and landscape changes. Continuations of long-term studies are requisite for accurately teasing local human influences (e.g. urbanization and watershed alteration) from global anthropogenic impacts (e.g. climate change) on watersheds. Effective and skillful translations (e.g. annual potential exposure of 750,000 people to our inquiry-based laboratory activities and interactive exhibits in Virginia) of results of scientific investigations are valuable ways of communicating information to the general public to enhance their understanding of climate change and its effects in watersheds.

  3. NREL: Energy Systems Integration Facility - Systems Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Systems Integration Systems integration considers the relationships among electricity, thermal, and fuel systems and data and information networks to ensure optimal interoperability across the energy spectrum. The Energy Systems Integration Facility's suite of systems integration laboratories provides advanced capabilities for research, development, and demonstration of key components of future energy systems. Photo of a man and a power quality meter system in a laboratory. The Energy Systems

  4. DOE-EM-STD-5502-94; DOE Limited Standard Hazard Baseline Documentation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... This subject is covered in DOE 5480.31, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-93, Planning and Conduct of Operational Readiness Reviews. This standard also ...

  5. 2014 SunShot Initiative Systems Integration Subprogram Overview |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Systems Integration Subprogram Overview 2014 SunShot Initiative Systems Integration Subprogram Overview These slides correspond to a presentation given by SunShot Initiative Systems Integration Acting Program Manager Dr. Ranga Pitchumani at the 2014 SunShot Grand Challenge Summit and Peer Review in Anaheim, CA. This presentation is an overview of the SunShot Initiative's systems integration research portfolio. PDF icon

  6. CHP Integrated with Packaged Boilers - Presentation by CMCE, Inc., June

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 | Department of Energy Integrated with Packaged Boilers - Presentation by CMCE, Inc., June 2011 CHP Integrated with Packaged Boilers - Presentation by CMCE, Inc., June 2011 Presentation on CHP Integrated with Packaged Boilers, given by Carlo Castaldini of CMCE, Inc., at the U.S. DOE Industrial Distributed Energy Portfolio Review Meeting in Washington, D.C. on June 1-2, 2011. PDF icon packaged_boilers_castaldini.pdf More Documents & Publications CHP Integrated with Burners for

  7. Annual Energy Review 2010

    SciTech Connect (OSTI)

    2011-10-01

    This twenty-ninth edition of the Annual Energy Review (AER) presents the U.S. Energy Information Administration’s (EIA) most comprehensive look at integrated energy statistics. The summary statistics on the Nation’s energy production, consumption, trade, stocks, and prices cover all major energy commodities and all energy-consuming sectors of the U.S. economy from 1949 through 2010. The AER is EIA’s historical record of energy statistics and, because the coverage spans six decades, the statistics in this report are well-suited to long-term trend analysis.

  8. Chapter 10: Concepts in Integrated Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Concepts in Integrated Analysis September 2015 Quadrennial Technology Review 10 Concepts in Integrated Analysis Issues and RDD&D Opportunities The goal of energy technology development programs, whether in the private sector or in government institutions, is to maximize the positive impact of research, development, demonstration, and deployment (RDD&D) portfolio investments. To evaluate total impacts, research institutions must consider multiple impact metrics that address

  9. CONTAIN independent peer review

    SciTech Connect (OSTI)

    Boyack, B.E. [Los Alamos National Lab., NM (United States); Corradini, M.L. [Univ. of Wisconsin, Madison, WI (United States). Nuclear Engineering Dept.; Denning, R.S. [Battelle Memorial Inst., Columbus, OH (United States); Khatib-Rahbar, M. [Energy Research Inc., Rockville, MD (United States); Loyalka, S.K. [Univ. of Missouri, Columbia, MO (United States); Smith, P.N. [AEA Technology, Dorchester (United Kingdom). Winfrith Technology Center

    1995-01-01

    The CONTAIN code was developed by Sandia National Laboratories under the sponsorship of the US Nuclear Regulatory Commission (NRC) to provide integrated analyses of containment phenomena. It is used to predict nuclear reactor containment loads, radiological source terms, and associated physical phenomena for a range of accident conditions encompassing both design-basis and severe accidents. The code`s targeted applications include support for containment-related experimental programs, light water and advanced light water reactor plant analysis, and analytical support for resolution of specific technical issues such as direct containment heating. The NRC decided that a broad technical review of the code should be performed by technical experts to determine its overall technical adequacy. For this purpose, a six-member CONTAIN Peer Review Committee was organized and a peer review as conducted. While the review was in progress, the NRC issued a draft ``Revised Severe Accident Code Strategy`` that incorporated revised design objectives and targeted applications for the CONTAIN code. The committee continued its effort to develop findings relative to the original NRC statement of design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications were considered by the Committee in assigning priorities to the Committee`s recommendations. The Committee determined some improvements are warranted and provided recommendations in five code-related areas: (1) documentation, (2) user guidance, (3) modeling capability, (4) code assessment, and (5) technical assessment.

  10. Integrated Safety Management Policy

    Broader source: Energy.gov [DOE]

    This Integrated Safety Management (ISM) System Description (ISMSD) defines how the U.S. Department of Energy (DOE) Office of Environmental Management (EM) integrates environment, safety, and health...

  11. Thermal Control & System Integration

    Broader source: Energy.gov [DOE]

    The thermal control and system integration activity focuses on issues such as the integration of motor and power control technologies and the development of advanced thermal control technologies....

  12. Integrating Environmental Stewardship

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    stewardship Many Laboratory functions are integrated with environmental stewardship. This Strategy cannot be effective without systematic integration with other related Laboratory...

  13. Distribution Grid Integration

    Broader source: Energy.gov [DOE]

    The DOE Systems Integration team funds distribution grid integration research and development (R&D) activities to address the technical issues that surround distribution grid planning,...

  14. Residential Buildings Integration (RBI)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    David Lee Program Manager Residential Buildings Integration (RBI) April 22, 2014 Residential Buildings Integration (RBI) MissionVision The Residential Buildings ...

  15. Commercial Buildings Integration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Integration Program Arah Schuur Program Manager arah.schuur@ee.doe.gov April 2, ... Commercial Buildings Integration Program Mission Accelerate voluntary uptake of ...

  16. Energy Systems Integration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Integration Ben Kroposki, PhD, PE Director, Energy Systems Integration National Renewable Energy Laboratory 2 Reducing investment risk and optimizing systems in a rapidly ...

  17. Accelerator and electrodynamics capability review

    SciTech Connect (OSTI)

    Jones, Kevin W

    2010-01-01

    Los Alamos National Laboratory (LANL) uses capability reviews to assess the science, technology and engineering (STE) quality and institutional integration and to advise Laboratory Management on the current and future health of the STE. Capability reviews address the STE integration that LANL uses to meet mission requirements. The Capability Review Committees serve a dual role of providing assessment of the Laboratory's technical contributions and integration towards its missions and providing advice to Laboratory Management. The assessments and advice are documented in reports prepared by the Capability Review Committees that are delivered to the Director and to the Principal Associate Director for Science, Technology and Engineering (PADSTE). Laboratory Management will use this report for STE assessment and planning. LANL has defined fifteen STE capabilities. Electrodynamics and Accelerators is one of the seven STE capabilities that LANL Management (Director, PADSTE, technical Associate Directors) has identified for review in Fiscal Year (FY) 2010. Accelerators and electrodynamics at LANL comprise a blend of large-scale facilities and innovative small-scale research with a growing focus on national security applications. This review is organized into five topical areas: (1) Free Electron Lasers; (2) Linear Accelerator Science and Technology; (3) Advanced Electromagnetics; (4) Next Generation Accelerator Concepts; and (5) National Security Accelerator Applications. The focus is on innovative technology with an emphasis on applications relevant to Laboratory mission. The role of Laboratory Directed Research and Development (LDRD) in support of accelerators/electrodynamics will be discussed. The review provides an opportunity for interaction with early career staff. Program sponsors and customers will provide their input on the value of the accelerator and electrodynamics capability to the Laboratory mission.

  18. CBEI: Benchmarking Analytics Tools - 2015 Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Benchmarking Analytics Tools - 2015 Peer Review CBEI: Benchmarking Analytics Tools - 2015 Peer Review Presenter: Clinton Andrews, Rutgers University View the Presentation PDF icon CBEI: Benchmarking Analytics Tools - 2015 Peer Review More Documents & Publications CBEI: Broker Training - Placing Value on Energy Retrofits - 2015 Peer Review Market Engagement Overview - 2015 BTO Peer Review CBEI: Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings

  19. Quality Assurance for Critical Decision Reviews RM | Department of Energy

    Energy Savers [EERE]

    Assurance for Critical Decision Reviews RM Quality Assurance for Critical Decision Reviews RM The purpose of this Quality Assurance for Capital Project Critical Decision Review Module (QA RM) is to identify, integrate, and clarify the QA performance objectives, criteria, and guidance needed to review project documents and activities. PDF icon Quality Assurance for Critical Decision Reviews RM More Documents & Publications Line Management Understanding of QA and Oversight Facility Software

  20. ORISE: How to Work with Us - Scientific Peer Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    How to Work With Us ORISE contract provides scientific peer review services for federal agencies The Oak Ridge Institute for Science Education coordinates the peer review process from beginning to end-planning, structuring and fully executing multi-format reviews that involve hundreds of reviewers. Each objective review is completed on schedule, within the budget and with a high degree of process integrity. ORISE assesses the scientific and technical merit of research and development proposals,

  1. Prioritization Tool - 2013 BTO Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - 2013 BTO Peer Review Prioritization Tool - 2013 BTO Peer Review Building Technologies Office Prioritization Tool Presentation for the 2013 Building Technologies Office's Program Peer Review PDF icon ptool_overview_abramson_040213.pdf More Documents & Publications Research & Development Roadmap: Emerging Water Heating Technologies Advanced Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review Emerging Technologies Program Overview - 2013 BTO Peer Review

  2. 2011 Biomass Program Peer Review Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Peer Review Report 2011 Biomass Program Peer Review Report This document summarizes the recommendations and evaluations resulting from the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Biomass Program's Biennial Peer Review Meeting, held June 27-28, 2011, at the DoubleTree Hotel-Crystal City in Arlington, Virginia. PDF icon 2011_program_review.pdf More Documents & Publications 2011 Biomass Program Platform Peer Review: Integrated Biorefineries 2011 Biomass

  3. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Grid Integration Transmission Grid Integration Transmission Grid...

  4. Sandia Energy - Distribution Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Distribution Grid Integration Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Grid Integration Distribution Grid Integration Distribution Grid...

  5. The 1993 baseline biological studies and proposed monitoring plan for the Device Assembly Facility at the Nevada Test Site

    SciTech Connect (OSTI)

    Woodward, B.D.; Hunter, R.B.; Greger, P.D.; Saethre, M.B.

    1995-02-01

    This report contains baseline data and recommendations for future monitoring of plants and animals near the new Device Assembly Facility (DAF) on the Nevada Test Site (NTS). The facility is a large structure designed for safely assembling nuclear weapons. Baseline data was collected in 1993, prior to the scheduled beginning of DAF operations in early 1995. Studies were not performed prior to construction and part of the task of monitoring operational effects will be to distinguish those effects from the extensive disturbance effects resulting from construction. Baseline information on species abundances and distributions was collected on ephemeral and perennial plants, mammals, reptiles, and birds in the desert ecosystems within three kilometers (km) of the DAF. Particular attention was paid to effects of selected disturbances, such as the paved road, sewage pond, and the flood-control dike, associated with the facility. Radiological monitoring of areas surrounding the DAF is not included in this report.

  6. Analytical Review

    SciTech Connect (OSTI)

    Frank Stodolsky

    2000-04-11

    ANL Performs Independent Review for DOE on the following topics: (1) Systematic analysis--Depends on question asked; (2) Compare technologies and pathways--Examples: (a) fuels, power plant technologies, vehicle materials; (b) Total lifecycle analysis reveals national and global impacts; and (3) Direction of R&D to most fruitful areas.

  7. Tank Waste Remediation System retrieval and disposal mission technical baseline summary description

    SciTech Connect (OSTI)

    McLaughlin, T.J.

    1998-01-06

    This document is prepared in order to support the US Department of Energy`s evaluation of readiness-to-proceed for the Waste Retrieval and Disposal Mission at the Hanford Site. The Waste Retrieval and Disposal Mission is one of three primary missions under the Tank Waste Remediation System (TWRS) Project. The other two include programs to characterize tank waste and to provide for safe storage of the waste while it awaits treatment and disposal. The Waste Retrieval and Disposal Mission includes the programs necessary to support tank waste retrieval, wastefeed, delivery, storage and disposal of immobilized waste, and closure of tank farms. This mission will enable the tank farms to be closed and turned over for final remediation. The Technical Baseline is defined as the set of science and engineering, equipment, facilities, materials, qualified staff, and enabling documentation needed to start up and complete the mission objectives. The primary purposes of this document are (1) to identify the important technical information and factors that should be used by contributors to the mission and (2) to serve as a basis for configuration management of the technical information and factors.

  8. NREL Solar Radiation Research Laboratory (SRRL): Baseline Measurement System (BMS); Golden, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Stoffel, T.; Andreas, A.

    The SRRL was established at the Solar Energy Research Institute (now NREL) in 1981 to provide continuous measurements of the solar resources, outdoor calibrations of pyranometers and pyrheliometers, and to characterize commercially available instrumentation. The SRRL is an outdoor laboratory located on South Table Mountain, a mesa providing excellent solar access throughout the year, overlooking Denver. Beginning with the basic measurements of global horizontal irradiance, direct normal irradiance and diffuse horizontal irradiance at 5-minute intervals, the SRRL Baseline Measurement System now produces more than 130 data elements at 1-min intervals that are available from the Measurement & Instrumentation Data Center Web site. Data sources include global horizontal, direct normal, diffuse horizontal (from shadowband and tracking disk), global on tilted surfaces, reflected solar irradiance, ultraviolet, infrared (upwelling and downwelling), photometric and spectral radiometers, sky imagery, and surface meteorological conditions (temperature, relative humidity, barometric pressure, precipitation, snow cover, wind speed and direction at multiple levels). Data quality control and assessment include daily instrument maintenance (M-F) with automated data quality control based on real-time examinations of redundant instrumentation and internal consistency checks using NREL's SERI-QC methodology. Operators are notified of equipment problems by automatic e-mail messages generated by the data acquisition and processing system. Radiometers are recalibrated at least annually with reference instruments traceable to the World Radiometric Reference (WRR).

  9. LTC America`s, Inc. PTC-6 vacuum system (metal): Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  10. NREL Solar Radiation Research Laboratory (SRRL): Baseline Measurement System (BMS); Golden, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Stoffel, T.; Andreas, A.

    1981-07-15

    The SRRL was established at the Solar Energy Research Institute (now NREL) in 1981 to provide continuous measurements of the solar resources, outdoor calibrations of pyranometers and pyrheliometers, and to characterize commercially available instrumentation. The SRRL is an outdoor laboratory located on South Table Mountain, a mesa providing excellent solar access throughout the year, overlooking Denver. Beginning with the basic measurements of global horizontal irradiance, direct normal irradiance and diffuse horizontal irradiance at 5-minute intervals, the SRRL Baseline Measurement System now produces more than 130 data elements at 1-min intervals that are available from the Measurement & Instrumentation Data Center Web site. Data sources include global horizontal, direct normal, diffuse horizontal (from shadowband and tracking disk), global on tilted surfaces, reflected solar irradiance, ultraviolet, infrared (upwelling and downwelling), photometric and spectral radiometers, sky imagery, and surface meteorological conditions (temperature, relative humidity, barometric pressure, precipitation, snow cover, wind speed and direction at multiple levels). Data quality control and assessment include daily instrument maintenance (M-F) with automated data quality control based on real-time examinations of redundant instrumentation and internal consistency checks using NREL's SERI-QC methodology. Operators are notified of equipment problems by automatic e-mail messages generated by the data acquisition and processing system. Radiometers are recalibrated at least annually with reference instruments traceable to the World Radiometric Reference (WRR).

  11. Development of baseline water quality stormwater detention pond model for Chesapeake Bay catchments

    SciTech Connect (OSTI)

    Musico, W.J.; Yoon, J.

    1999-07-01

    An environmental impact assessment is required for every proposed development in the Commonwealth of Virginia to help identify areas of potential concerns. The purpose of the Chesapeake Bay Local Assistance Department (CBLAD), Guidance Calculation Procedures is to ensure that development of previously constructed areas do not further exacerbate current problems of stormwater-induced eutrophication and downstream flooding. The methodology is based on the post development conditions that will not generate greater peak flows and will result in a 10% overall reduction of total phosphorus. Currently, several well-known models can develop hydrographs and pollutographs that accurately model the real response of a given watershed to any given rainfall event. However, conventional method of achieving the desired peak flow reduction and pollutant removal is not a deterministic procedure, and is inherently a trail and error process. A method of quickly and accurately determining the required size of stormwater easements was developed to evaluate the effectiveness of alternative stormwater collection and treatment systems. In this method, predevelopment conditions were modeled first to estimate the peak flows and subsequent pollutants generation that can be used as a baseline for post development plan. Resulting stormwater easement estimates facilitate decision-making processes during the planning and development phase of a project. The design can be optimized for the minimum cost or the smallest-possible pond size required for peak flow reduction and detention time given the most basic data such as: inflow hydrograph and maximum allowable pond depth.

  12. Procurement Integrity Brochure What is Procurement Integrity?

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement Integrity Brochure What is Procurement Integrity? The Department of Energy, like most federal agencies, purchases many products and services from the private sector. To preserve the integrity of the Federal procurement process and assure fair treatment of bidders, offerors, and contractors, laws govern the procurement process and the manner in which federal and contractor personnel conduct business with each other. One of these statutes is Section 27 of the Office of Federal

  13. Integration of Sustainability Metrics into Design Cases and State...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bioenergy Technologies Office (BETO) 2015 Project Peer Review Integration of Sustainability Metrics into Design Cases and State of Technology Assessments 2.1.0.1002.1.0.302 NREL ...

  14. Integration of Full Tensor Gravity and ZTEM Passive Low Frequency EM Instruments for Simultaneous Data Acquisition

    Broader source: Energy.gov [DOE]

    Integration of Full Tensor Gravity and ZTEM Passive Low Frequency EM Instruments for Simultaneous Data Acquisition presentation at the April 2013 peer review meeting held in Denver, Colorado.

  15. Integration of Noise and Coda Correlation Data into Kinematic and Waveform Inversions

    Broader source: Energy.gov [DOE]

    Integration of Noise and Coda Correlation Data into Kinematic and Waveform Inversions presentation at the April 2013 peer review meeting held in Denver, Colorado.

  16. FES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  17. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  18. Hanford and Savannah River Site Programmatic and Technical Integration

    SciTech Connect (OSTI)

    Ramsey, William Gene

    2013-08-15

    Abstract only. The Hanford Site and the Savannah River Site (SRS) were the primary plutonium production facilities within the U.S. nuclear weapons complex. Radioactive wastes were generated as part of these missions and are stored in similar fashion. The majority of radioactivity maintained by the two sites is located in underground carbon steel tanks in the physical form of supernatant, saltcake, or sludge. Disposition of SRS tank waste is ongoing by converting it into glass (pathway for sludge and radionuclides separated from supernatant or dissolved saltcake) or cement (pathway for the decontaminated supernatant and dissolved saltcake). Tank closure activity has also begun at SRS and will continue for the duration of mission. The Hanford tank waste inventory is roughly 2/3rds larger than SRS's by volume- but nominally half the radioactivity. The baseline disposition path includes high-level and low-activity waste vitrification with separate disposition of contact-handled transuranic tank waste. Retrieval of tank waste from aging single­ shell tanks (SSTs) into double-shell tanks (DSTs) is currently ongoing. As vitrification commences later this decade, Hanford will be in a similar operations mode as SRS. Site integration is increasing as the missions align. The ongoing integration is centered on key issues that impact both sites- regardless of mission timeframe. Three recent workshop exchanges have been held to improve communication with the primary intent of improving operations and technical work organization. The topics of these workshops are as follows: DST space utilization, optimization, and closure; Waste Feed Qualification; and, Cementitious Waste Forms. Key goals for these and future exchanges include aligning research and technology, preparing for joint initiatives (to maximize budgetary value for the customer), and reviewing lessons learned. Each site has played a leading role in the development of technology and operational practices that can be used to meet current challenges and to minimize the impact of future challenges. This paper provides an overview of the exchanges held, but predominately focuses on the team development and actions leading from the workshops.

  19. Transforming Commercial Building Operations - 2013 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Commercial Building Operations - 2013 BTO Peer Review Transforming Commercial Building Operations - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review PDF icon commlbldgs13_underhill_040413.pdf More Documents & Publications Transforming the Commercial Building Operations - 2014

  20. Integrated Computational Materials Engineering (ICME) for Mg: International

    Broader source: Energy.gov (indexed) [DOE]

    Pilot Project | Department of Energy 1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon lm012_li_2011_o.pdf More Documents & Publications Integrated Computational Materials Engineering (ICME) for Mg: International Pilot Project Integrated Computational Materials Engineering (ICME) for Mg: International Pilot Project (Part 1) Vehicle Technologies Office Merit Review 2015: Magnesium-Intensive Front End

  1. Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel

    Office of Environmental Management (EM)

    Management | Department of Energy Commission's Integrated Strategy for Spent Fuel Management Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management * 20+ years of preparation for the licensing review * DOE application received in June 2008 and accepted for review in September 2008 * President Obama pursues alternatives to Yucca Mountain * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future PDF icon Nuclear Regulatory Commission's

  2. Development of High-Capacity Cathode Materials with Integrated Structures |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon es019_thackeray_2012_o.pdf More Documents & Publications Development of High-Capacity Cathode Materials with Integrated Structures Vehicle Technologies Office Merit Review 2015: Design and Evaluation of High Capacity Cathodes Development of High-Capacity Cathode Materials with Integrated Structures

  3. Evaluation of final waste forms and recommendations for baseline alternatives to group and glass

    SciTech Connect (OSTI)

    Bleier, A.

    1997-09-01

    An assessment of final waste forms was made as part of the Federal Facilities Compliance Agreement/Development, Demonstration, Testing, and Evaluation (FFCA/DDT&E) Program because supplemental waste-form technologies are needed for the hazardous, radioactive, and mixed wastes of concern to the Department of Energy and the problematic wastes on the Oak Ridge Reservation. The principal objective was to identify a primary waste-form candidate as an alternative to grout (cement) and glass. The effort principally comprised a literature search, the goal of which was to establish a knowledge base regarding four areas: (1) the waste-form technologies based on grout and glass, (2) candidate alternatives, (3) the wastes that need to be immobilized, and (4) the technical and regulatory constraints on the waste-from technologies. This report serves, in part, to meet this goal. Six families of materials emerged as relevant; inorganic, organic, vitrified, devitrified, ceramic, and metallic matrices. Multiple members of each family were assessed, emphasizing the materials-oriented factors and accounting for the fact that the two most prevalent types of wastes for the FFCA/DDT&E Program are aqueous liquids and inorganic sludges and solids. Presently, no individual matrix is sufficiently developed to permit its immediate implementation as a baseline alternative. Three thermoplastic materials, sulfur-polymer cement (inorganic), bitumen (organic), and polyethylene (organic), are the most technologically developed candidates. Each warrants further study, emphasizing the engineering and economic factors, but each also has limitations that regulate it to a status of short-term alternative. The crystallinity and flexible processing of sulfur provide sulfur-polymer cement with the highest potential for short-term success via encapsulation. Long-term immobilization demands chemical stabilization, which the thermoplastic matrices do not offer. Among the properties of the remaining candidates, those of glass-ceramics (devitrified matrices) represent the best compromise for meeting the probable stricter disposal requirements in the future.

  4. Baseline biological risk assessment for aquatic populations occurring near Eielson Air Force Base, Alaska

    SciTech Connect (OSTI)

    Dauble, D.; Brandt, C.; Lewis, R.; Smith, R.

    1995-12-31

    Eielson Air Force Base (AFB), Alaska was listed as a Superfund site in November 1989 with 64 potential source areas of contamination. As part of a sitewide remedial investigation, baseline risk assessments were conducted in 1993 and 1994 to evaluate hazards posed to biological receptors and to human health. Fish tissue, aquatic invertebrates, aquatic vegetation, sediment, and surface water data were collected from several on-site and off-site surface water bodies. An initial screening risk assessment indicated that several surface water sites along two major tributary creeks flowing through the base had unacceptable risks to both aquatic receptors and to human health because of DDTs. Other contaminants of concern (i.e., PCBs and PAHs) were below screening risk levels for aquatic organisms, but contributed to an unacceptable risk to human health. Additional samples was taken in 1994 to characterize the site-wide distribution of PAHs, DDTs, and PCBs in aquatic biota and sediments. Concentrations of PAHs were invertebrates > aquatic vegetation > fish, but concentrations were sufficiently low that they posed no significant risk to biological receptors. Pesticides were detected in all fish tissue samples. Polychlorinated biphenyls (PCBs) were also detected in most fish from Garrison Slough. The pattern of PCB concentrations in Arctic grayling (Thymallus arcticus) was related to their proximity to a sediment source in lower Garrison Slough. Ingestion of PCB-contaminated fish is the primary human-health risk driver for surface water bodies on Eielson AFB, resulting in carcinogenic risks > 1 {times} 10{sup {minus}4} for future recreational land-use at some sites. Principal considerations affecting uncertainty in the risk assessment process included spatial and temporal variability in media contaminant concentrations and inconsistencies between modelled and measured body burdens.

  5. Baseline risk assessment for exposure to contaminants at the St. Louis Site, St. Louis, Missouri

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The St. Louis Site comprises three noncontiguous areas in and near St. Louis, Missouri: the St. Louis Downtown Site (SLDS), the St. Louis Airport Storage Site (SLAPS), and the Latty Avenue Properties. The main site of the Latty Avenue Properties includes the Hazelwood Interim Storage Site (HISS) and the Futura Coatings property, which are located at 9200 Latty Avenue. Contamination at the St. Louis Site is the result of uranium processing and disposal activities that took place from the 1940s through the 1970s. Uranium processing took place at the SLDS from 1942 through 1957. From the 1940s through the 1960s, SLAPS was used as a storage area for residues from the manufacturing operations at SLDS. The materials stored at SLAPS were bought by Continental Mining and Milling Company of Chicago, Illinois, in 1966, and moved to the HISS/Futura Coatings property at 9200 Latty Avenue. Vicinity properties became contaminated as a result of transport and movement of the contaminated material among SLDS, SLAPS, and the 9200 Latty Avenue property. This contamination led to the SLAPS, HISS, and Futura Coatings properties being placed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA). The US Department of Energy (DOE) is responsible for cleanup activities at the St. Louis Site under its Formerly Utilized Sites Remedial Action Program (FUSRAP). The primary goal of FUSRAP is the elimination of potential hazards to human health and the environment at former Manhattan Engineer District/Atomic Energy Commission (MED/AEC) sites so that, to the extent possible, these properties can be released for use without restrictions. To determine and establish cleanup goals for the St. Louis Site, DOE is currently preparing a remedial investigation/feasibility study-environmental impact statement (RI/FS-EIS). This baseline risk assessment (BRA) is a component of the process; it addresses potential risk to human health and the environment associated wi

  6. Statistical Comparison of the Baseline Mechanical Properties of NBG-18 and PCEA Graphite

    SciTech Connect (OSTI)

    Mark C. Carroll; David T. Rohrbaugh

    2013-08-01

    High-purity graphite is the core structural material of choice in the Very High Temperature Reactor (VHTR), a graphite-moderated, helium-cooled design that is capable of producing process heat for power generation and for industrial process that require temperatures higher than the outlet temperatures of present nuclear reactors. The Baseline Graphite Characterization Program is endeavoring to minimize the conservative estimates of as-manufactured mechanical and physical properties by providing comprehensive data that captures the level of variation in measured values. In addition to providing a comprehensive comparison between these values in different nuclear grades, the program is also carefully tracking individual specimen source, position, and orientation information in order to provide comparisons and variations between different lots, different billets, and different positions from within a single billet. This report is a preliminary comparison between the two grades of graphite that were initially favored in the two main VHTR designs. NBG-18, a medium-grain pitch coke graphite from SGL formed via vibration molding, was the favored structural material in the pebble-bed configuration, while PCEA, a smaller grain, petroleum coke, extruded graphite from GrafTech was favored for the prismatic configuration. An analysis of the comparison between these two grades will include not only the differences in fundamental and statistically-significant individual strength levels, but also the differences in variability in properties within each of the grades that will ultimately provide the basis for the prediction of in-service performance. The comparative performance of the different types of nuclear grade graphites will continue to evolve as thousands more specimens are fully characterized from the numerous grades of graphite being evaluated.

  7. M & V Shootout: Setting the Stage For Testing the Performance of New Energy Baseline

    SciTech Connect (OSTI)

    Touzani, Samir; Custodio, Claudine; Sohn, Michael; Fernandes, Samuel; Granderson, Jessica; Jump, David; Taylor, Cody

    2015-07-01

    Trustworthy savings calculations are critical to convincing investors in energy efficiency projects of the benefit and cost-effectiveness of such investments and their ability to replace or defer supply-side capital investments. However, today’s methods for measurement and verification (M&V) of energy savings constitute a significant portion of the total costs of efficiency projects. They also require time-consuming data acquisition and often do not deliver results until years after the program period has ended. A spectrum of savings calculation approaches are used, with some relying more heavily on measured data and others relying more heavily on estimated or modeled data, or stipulated information. The rising availability of “smart” meters, combined with new analytical approaches to quantifying savings, has opened the door to conducting M&V more quickly and at lower cost, with comparable or improved accuracy. Energy management and information systems (EMIS) technologies, not only enable significant site energy savings, but are also beginning to offer M&V capabilities. This paper expands recent analyses of public-domain, whole-building M&V methods, focusing on more novel baseline modeling approaches that leverage interval meter data. We detail a testing procedure and metrics to assess the performance of these new approaches using a large test dataset. We also provide conclusions regarding the accuracy, cost, and time trade-offs between more traditional M&V and these emerging streamlined methods. Finally, we discuss the potential evolution of M&V to better support the energy efficiency industry through low-cost approaches, and the long-term agenda for validation of building energy analytics.

  8. Baseline Utilization of Breast Radiotherapy Before Institution of the Medicare Practice Quality Reporting Initiative

    SciTech Connect (OSTI)

    Smith, Benjamin D. Smith, Grace L.; Roberts, Kenneth B.; Buchholz, Thomas A.

    2009-08-01

    Purpose: In 2007, Medicare implemented the Physician Quality Reporting Initiative (PQRI), which provides financial incentives to physicians who report their performance on certain quality measures. PQRI measure no. 74 recommends radiotherapy for patients treated with conservative surgery (CS) for invasive breast cancer. As a first step in evaluating the potential impact of this measure, we assessed baseline use of radiotherapy among women diagnosed with invasive breast cancer before implementation of PQRI. Methods and Materials: Using the SEER-Medicare data set, we identified women aged 66-70 diagnosed with invasive breast cancer and treated with CS between 2000 and 2002. Treatment with radiotherapy was determined using SEER and claims data. Multivariate logistic regression tested whether receipt of radiotherapy varied significantly across clinical, pathologic, and treatment covariates. Results: Of 3,674 patients, 94% (3,445) received radiotherapy. In adjusted analysis, the presence of comorbid illness (odds ratio [OR] 1.69; 95% confidence interval [CI], 1.19-2.42) and unmarried marital status were associated with omission of radiotherapy (OR 1.65; 95% CI, 1.22-2.20). In contrast, receipt of chemotherapy was protective against omission of radiotherapy (OR 0.25; 95% CI, 0.16-0.38). Race and geographic region did not correlate with radiotherapy utilization. Conclusions: Utilization of radiotherapy following CS was high for patients treated before institution of PQRI, suggesting that at most 6% of patients could benefit from measure no. 74. Further research is needed to determine whether institution of PQRI will affect radiotherapy utilization.

  9. Level III baseline risk evaluation for Building 3505 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Mostella, W.B. Jr.

    1994-12-01

    The Level III Baseline Risk Evaluation (BRE) for Building 3505, the ORNL Metal Recovery Facility, provides an analysis of the potential for adverse health effects, current or future, associated with the presence of hazardous substances in the building. The Metal Recovery Facility was used from 1952 through 1960 to process large quantities of radioactive material using the PUREX process for the recovery of uranium-238, plutonium-239, neptunium-237, and americium-241. The facility consists of seven process cells (A through G), a canal, a dissolver room, a dissolver pit, an office, locker room, storage area, control room, electrical gallery, shop, and makeup area. The cells were used to house the nuclear fuel reprocessing equipment, and the canal was constructed to be used as a water-shielded transfer canal. Currently, there are no known releases of radioactive contaminants from Building 3505. To perform the BRE, historical radiological survey data were used to estimate the concentration of alpha- and beta/gamma emitting radionuclides in the various cells, rooms, and other areas in Building 3505. Data from smear surveys were used to estimate the amount of transferable contamination (to which receptors can be exposed via inhalation and ingestion), and data from probe surveys were used to estimate the amount of both fixed and transferable contamination (from which receptors can receive external exposure). Two land use scenarios, current and future, and their subsequent exposure scenarios were explored in the BRE. Under the current land use scenario, two exposure scenarios were evaluated. The first was a worst-case industrial exposure scenario in which the receptor is a maintenance worker who works 8 hours/day, 350 days/year in the building for 25 years. In the second, more realistic exposure scenario, the receptor is a surveillance and maintenance (S&M) worker who spends two 8-hour days/year in the building for 25 years.

  10. EA-2020: Energy Efficiency Standards for New Federal Low-Rise Residential Buildings’ Baseline Standards Update (RIN 1904-AD56)

    Broader source: Energy.gov [DOE]

    This EA will evaluate the potential environmental impacts of implementing the provisions in the Energy Conservation and Production Act (ECPA) that require DOE to update the baseline Federal energy efficiency performance standards for the construction of new Federal buildings, including low-rise residential buildings.

  11. Integration of oxygen plants and gas turbines in IGCC facilities

    SciTech Connect (OSTI)

    Smith, A.R.; Sorensen, J.C.; Woodward, D.W.

    1996-10-01

    The commercialization of Integrated Gasification Combined-Cycle (IGCC) power has been aided by concepts involving the integration of a cryogenic air separation unit (ASU) with the gas turbine combined-cycle module. It is known and now widely accepted that an ASU designed for elevated pressure service and optimally integrated with the gas turbine can increase overall IGCC power output, increase overall efficiency, and decrease the net cost of power generation compared to non-integrated facilities employing low pressure ASU`s. Depending upon the specific gas turbine, gasification technology, NO{sub x} emission specification, and other site specific factors, various degrees of compressed air and nitrogen integration are optimal. Air Products has supplied ASU`s with no integration (Destec/Plaquemine IGCC), nitrogen-only integration (Tampa Electric/Polk County IGCC), and full air and nitrogen integration (Demkolec/Buggenum IGCC). Continuing advancements in both air separation and gas turbine technologies offer new integration opportunities to further improve performance and reduce costs. This paper reviews basic integration principles, highlights the integration scheme used at Polk County, and describes some advanced concepts based on emerging gas turbines. Operability issues associated with integration will be reviewed and control measures described for the safe, efficient, and reliable operation of these facilities.

  12. Microsoft Word - PeerReview_SAR.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Peer Review of a "Synthesis and Assessment Report on Scenarios of Greenhouse Gas Emissions and Atmospheric Concentrations and Review of Integrated Scenario Development and Application" Pursuant to Section V of the "Information Quality Bulletin for Peer Review" of the Office of Management and Budget (OMB), under the authority of the Information Quality Act of 2000 (P.L. 106-554), the U.S. Climate Change Science Program (CCSP) announces a plan for a peer review of its

  13. Sampling designs for geochemical baseline studies in the Colorado oil shale region: a manual for practical application

    SciTech Connect (OSTI)

    Klusman, R. W.; Ringrose, C. D.; Candito, R. J.; Zuccaro, B.; Rutherford, D. W.; Dean, W. E.

    1980-06-01

    This manual presents a rationale for sampling designs, and results of geochemical baseline studies in the Colorado portion of the oil-shale region. The program consists of a systematic trace element study of soils, stream sediments, and plants carried out in a way to be conservative of human and financial resources and yield maximum information. Extension of this approach to other parameters, other locations, and to environmental baseline studies in general is a primary objective. A baseline for any geochemical parameter can be defined as the concentration of that parameter in a given medium such as soil, the range of its concentration, and the geographic scale of variability. In air quality studies, and to a lesser extent for plants, the temporal scale of variability must also be considered. In studies of soil, the temporal variablility does not become a factor until such time that a study is deemed necessary to evaluate whether or not there have been changes in baseline levels as a result of development. The manual is divided into five major parts. The first is a suggested sampling protocol which is presented in an outline form for guiding baseline studies in this area. The second section is background information on the physical features of the area of study, trace elements of significance occurring in oil shale, and the sample media used in these studies. The third section is concerned primarily with sampling design and its application to the geochemical studies of the oil shale region. The last sections, in the form of appendices, provide actual data and illustrate in a systematic manner, the calculations performed to obtain the various summary data. The last segment of the appendices is a more academic discussion of the geochemistry of trace elements and the parameters of importance influencing their behavior in natural systems.

  14. Advanced Integrated Electric Traction System | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon ape014_smith_2011_o.pdf More Documents & Publications Advanced Integrated Electric Traction System Advanced Integrated Electric Traction System Vehicle Technologies Office: 2013 Advanced Power Electronics and Electric Motors R&D Annual Progress Report

  15. Advanced Integrated Electric Traction System | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    09 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon ape_09_smith.pdf More Documents & Publications Advanced Integrated Electric Traction System Advanced Integrated Electric Traction System Class 8 Truck Freight Efficiency Improvement Project

  16. Short-baseline electron neutrino disappearance, tritium beta decay, and neutrinoless double-beta decay

    SciTech Connect (OSTI)

    Giunti, Carlo; Laveder, Marco [INFN, Sezione di Torino, Via P. Giuria 1, I-10125 Torino (Italy); Dipartimento di Fisica G. Galilei, Universita di Padova, and INFN, Sezione di Padova, Via F. Marzolo 8, I-35131 Padova (Italy)

    2010-09-01

    We consider the interpretation of the MiniBooNE low-energy anomaly and the gallium radioactive source experiments anomaly in terms of short-baseline electron neutrino disappearance in the framework of 3+1 four-neutrino mixing schemes. The separate fits of MiniBooNE and gallium data are highly compatible, with close best-fit values of the effective oscillation parameters {Delta}m{sup 2} and sin{sup 2}2{theta}. The combined fit gives {Delta}m{sup 2}(greater-or-similar sign)0.1 eV{sup 2} and 0.11(less-or-similar sign)sin{sup 2}2{theta}(less-or-similar sign)0.48 at 2{sigma}. We consider also the data of the Bugey and Chooz reactor antineutrino oscillation experiments and the limits on the effective electron antineutrino mass in {beta} decay obtained in the Mainz and Troitsk tritium experiments. The fit of the data of these experiments limits the value of sin{sup 2}2{theta} below 0.10 at 2{sigma}. Considering the tension between the neutrino MiniBooNE and gallium data and the antineutrino reactor and tritium data as a statistical fluctuation, we perform a combined fit which gives {Delta}m{sup 2}{approx_equal}2 eV and 0.01(less-or-similar sign)sin{sup 2}2{theta}(less-or-similar sign)0.13 at 2{sigma}. Assuming a hierarchy of masses m{sub 1}, m{sub 2}, m{sub 3}<

  17. INITIAL COMPARISON OF BASELINE PHYSICAL AND MECHANICAL PROPERTIES FOR THE VHTR CANDIDATE GRAPHITE GRADES

    SciTech Connect (OSTI)

    Carroll, Mark C

    2014-09-01

    High-purity graphite is the core structural material of choice in the Very High Temperature Reactor (VHTR) design, a graphite-moderated, helium-cooled configuration that is capable of producing thermal energy for power generation as well as process heat for industrial applications that require temperatures higher than the outlet temperatures of present nuclear reactors. The Baseline Graphite Characterization Program is endeavoring to minimize the conservative estimates of as-manufactured mechanical and physical properties in nuclear-grade graphites by providing comprehensive data that captures the level of variation in measured values. In addition to providing a thorough comparison between these values in different graphite grades, the program is also carefully tracking individual specimen source, position, and orientation information in order to provide comparisons both in specific properties and in the associated variability between different lots, different billets, and different positions from within a single billet. This report is a preliminary comparison between each of the grades of graphite that are considered candidate grades from four major international graphite producers. These particular grades (NBG-18, NBG-17, PCEA, IG-110, and 2114) are the major focus of the evaluations presently underway on irradiated graphite properties through the series of Advanced Graphite Creep (AGC) experiments. NBG-18, a medium-grain pitch coke graphite from SGL from which billets are formed via vibration molding, was the favored structural material in the pebble-bed configuration. NBG-17 graphite from SGL is essentially NBG-18 with the grain size reduced by a factor of two. PCEA, petroleum coke graphite from GrafTech with a similar grain size to NBG-17, is formed via an extrusion process and was initially considered the favored grade for the prismatic layout. IG-110 and 2114, from Toyo Tanso and Mersen (formerly Carbone Lorraine), respectively, are fine-grain grades produced via an isomolding process. An analysis of the comparison between each of these grades will include not only the differences in fundamental and statistically-significant individual strength levels, but also the differences in variability in properties within each of the grades that will ultimately provide the basis for the prediction of in-service performance. The comparative performance of the different types of nuclear-grade graphites will continue to evolve as thousands more specimens are fully characterized from the numerous grades of graphite being evaluated.

  18. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 BER Attendees 2015 ASCR Requirements...

  19. Development of High-Capacity Cathode Materials with Integrated Structures |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon es019_kang_2011_p.pdf More Documents & Publications Development of High-Capacity Cathode Materials with Integrated Structures Development of High-Capacity Cathode Materials with Integrated Structures Development of high-capacity cathode materials with integrated structures

  20. Electric utility system planning studies for OTEC power integration. Final report

    SciTech Connect (OSTI)

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  1. NREL: Transmission Grid Integration - Wind Integration Datasets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Integration Datasets The datasets below provide energy professionals with a consistent set of wind profiles for the United States. Eastern and Western Wind Datasets The Eastern and Western Wind Datasets provide 10-minute time-series wind data for 2004, 2005, and 2006. These datasets were designed to help energy professionals perform wind integration studies and estimate power production from hypothetical wind plants. For the Eastern dataset, more than 1,326 simulated wind plant data points

  2. Reviews and Validations

    Broader source: Energy.gov [DOE]

    Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External...

  3. CBEI: Aligning Owners and Service Providers - 2015 Peer Review | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Aligning Owners and Service Providers - 2015 Peer Review CBEI: Aligning Owners and Service Providers - 2015 Peer Review Presenter: Leslie Billhymer, University of Pennsylvania View the Presentation PDF icon CBEI: Aligning Owners and Service Providers - 2015 Peer Review More Documents & Publications CBEI: Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings - 2015 Peer Review CBEI: HVAC Packages for Small and Medium Sized Commercial Buildings

  4. CBEI: Transitioning Technology to the Market - 2015 Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Transitioning Technology to the Market - 2015 Peer Review CBEI: Transitioning Technology to the Market - 2015 Peer Review Presenter: Tim Wagner, UTRC View the Presentation PDF icon CBEI: Transitioning Technology to the Market - 2015 Peer Review More Documents & Publications CBEI: Lessons Learned from Integrated Retrofits in Small and Medium Sized Commercial Buildings - 2015 Peer Review CBEI: HVAC Packages for Small and Medium Sized Commercial Buildings - 2015 Peer

  5. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 | Department of Energy April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO). The objective

  6. Technology Performance Exchange - 2013 BTO Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Performance Exchange - 2013 BTO Peer Review Technology Performance Exchange - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review PDF icon commlbldgs01_livingood_040213.pdf More Documents & Publications Building Energy Modeling Library - 2013 BTO Peer Review Whole Building Performance-Based Procurement Training Small- and Medium-Size Building Automation and Control System Needs: Scoping Study

  7. Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July

    Energy Savers [EERE]

    2013 | Department of Energy April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO). The objective

  8. Integrated Power Module Cooling

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  9. Integrated Module Heat Exchanger

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  10. Technology Integration Overview

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  11. System Integration and Validation

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  12. Smart Integrated Power Module

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  13. Integrated rural energy planning

    SciTech Connect (OSTI)

    El Mahgary, Y.; Biswas, A.K.

    1985-01-01

    This book presents papers on integrated community energy systems in developing countries. Topics considered include an integrated rural energy system in Sri Lanka, rural energy systems in Indonesia, integrated rural food-energy systems and technology diffusion in India, bringing energy to the rural sector in the Philippines, the development of a new energy village in China, the Niaga Wolof experimental rural energy center, designing a model rural energy system for Nigeria, the Basaisa village integrated field project, a rural energy project in Tanzania, rural energy development in Columbia, and guidelines for the planning, development and operation of integrated rural energy projects.

  14. System configuration management plan for the TWRS controlled baseline database system [TCBD

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    LHMC, TWRS Business Management Organization (BMO) is designated as system owner, operator, and maintenance authority. The TWAS BMO identified the need for the TCBD. The TWRS BMO users have established all requirements for the database and are responsible for maintaining database integrity and control (after the interface data has been received). Initial interface data control and integrity is maintained through functional and administrative processes and is the responsibility of the database owners who are providing the data. The specific groups within the TWRS BMO affected by this plan are the Financial Management and TWRS Management Support Project, Master Planning, and the Financial Control Integration and Reporting. The interfaces between these organizations are through normal line management chain of command. The Master Planning Group is assigned the responsibility to continue development and maintenance of the TCBD. This group maintains information that includes identification of requirements and changes to those requirements in a TCBD project file. They are responsible for the issuance, maintenance, and change authority of this SCW. LHMC, TWRS TCBD Users are designated as providing the project`s requirement changes for implementation and also testing of the TCBD during development. The Master Planning Group coordinates and monitors the user`s requests for system requirements (new/existing) as well as beta and acceptance testing. Users are those individuals and organizations needing data or information from the TCBD and having both a need-to-know and the proper training and authority to access the database. Each user or user organization is required to comply with the established requirements and procedures governing the TCBD. Lockheed Martin Services, Inc. (LMSI) is designated the TCBD developer, maintainer, and custodian until acceptance and process testing of the system has been completed via the TWRS BMO. Once this occurs, the TCBD will be completed and the software transferred to the system owner. The primary programming for the TCBD was developed by Selfware, Inc. The Automatic Data Processing (ADP) Acquisition Plan, Systems Development and Support Services for TWRS Performance Measurement and Control System, Acquisition Plan No. C94-705286 identifies work scope, deliverables, and cost.

  15. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect (OSTI)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  16. Baseline and optional bench-scale testing of a chemical candle filter safeguard device

    SciTech Connect (OSTI)

    Hurley, J.P.; Swanson, M.L.

    2000-11-01

    This project was undertaken by the Energy and Environmental Research Center (EERC) to design, construct, and test the feasibility of a hot-gas filter safeguard device (SGD) to prevent the release of dust in the event of candle filter failure under both pressurized fluidized-bed combustion (PFBC) (oxidizing) and integrated gasification combined cycle (IGCC) (reducing) operating conditions. The SGD must use existing filter system seals, gaskets, fixtures, and assemblies as much as possible. It must also activate quickly when a candle filter has failed, preferably preventing dust concentrations downstream of the SGD from exceeding 1 ppmw. In addition, the SGD must be able to operate in an inactive mode with minimal pressure drop, and its operation cannot be affected by repeated backpulse cleaning events of up to 3 psia and 1/2 second in duration.

  17. Fusion power production in International Thermonuclear Experimental Reactor baseline H-mode scenarios

    SciTech Connect (OSTI)

    Rafiq, T.; Kritz, A. H.; Kessel, C. E.; Pankin, A. Y.

    2015-04-15

    Self-consistent simulations of 15 MA ITER H-mode DT scenarios, from ramp-up through flat-top, are carried out. Electron and ion temperatures, toroidal angular frequency, and currents are evolved, in simulations carried out using the predictive TRANSPort and integrated modeling code starting with initial profiles and equilibria obtained from tokamak simulation code studies. Studies are carried out examining the dependence and sensitivity of fusion power production on electron density, argon impurity concentration, choice of radio frequency heating, pedestal temperature without and with E × B flow shear effects included, and the degree of plasma rotation. The goal of these whole-device ITER simulations is to identify dependencies that might impact ITER fusion performance.

  18. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Requirements Review 2015 ASCR Attendees 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » ASCR Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  19. 2008 annual merit review

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    The 2008 DOE Vehicle Technologies Program Annual Merit Review was held February 25-28, 2008 in Bethesda, Maryland. The review encompassed all of the work done by the Vehicle Technologies Program: a total of 280 individual activities were reviewed, by a total of just over 100 reviewers. A total of 1,908 individual review responses were received for the technical reviews, and an additional 29 individual review responses were received for the plenary session review.

  20. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Attendees 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » BER Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials