National Library of Energy BETA

Sample records for integrated baseline review

  1. Module 7 - Integrated Baseline Review and Change Control | Department of

    Office of Environmental Management (EM)

    Energy 7 - Integrated Baseline Review and Change Control Module 7 - Integrated Baseline Review and Change Control This module focuses on integrated baseline reviews (IBR) and change control. This module outlines the objective and responsibility of an integrated baseline review. Additionally, this module will discuss the change control process required for implementing earned value. Begin Module >> (418.59

  2. EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process...

    Energy Savers [EERE]

    2 Integrated Baseline Review (IBR) Process EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process This EVMS Training Snippet sponsored by the Office of Project ...

  3. EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet sponsored by the Office of Project Management (PM) covers the Integrated Baseline Review (IBR) process. 

  4. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) covers how to review an Integrated Master Schedule (IMS) and highlights common areas of non-compliance with ANSI/EIA...

  5. Gated integrator with signal baseline subtraction

    DOE Patents [OSTI]

    Wang, X.

    1996-12-17

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window. 5 figs.

  6. Gated integrator with signal baseline subtraction

    DOE Patents [OSTI]

    Wang, Xucheng

    1996-01-01

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window.

  7. Integrated Baseline System (IBS) Version 2.0: Models guide

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Models Guide summarizes the IBS use of several computer models for predicting the results of emergency situations. These include models for predicting dispersion/doses of airborne contaminants, traffic evacuation, explosion effects, heat radiation from a fire, and siren sound transmission. The guide references additional technical documentation on the models when such documentation is available from other sources. The audience for this manual is chiefly emergency management planners and analysts, but also data managers and system managers.

  8. Integrated Baseline System (IBS) Version 1.03: Utilities guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Pottier, M.C.; Schrank, E.E.; Williams, J.R.

    1993-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This Utilities Guide explains how to operate utility programs that are supplied as a part of the IBS. These utility programs are chiefly for managing and manipulating various kinds of IBS data and system administration files. Many of the utilities are for creating, editing, converting, or displaying map data and other data that are related to geographic location.

  9. Integrated Baseline System (IBS) Version 2.0: Utilities Guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Williams, J.R.; Bower, J.C.

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Utilities Guide explains how you can use the IBS utility programs to manage and manipulate various kinds of IBS data. These programs include utilities for creating, editing, and displaying maps and other data that are referenced to geographic location. The intended audience for this document are chiefly data managers but also system managers and some emergency management planners and analysts.

  10. Integrated Baseline Bystem (IBS) Version 1.03: Models guide

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Integrated Baseline System)(IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planning and analysis. This document is the models guide for the IBS and explains how to use the emergency related computer models. This document provides information for the experienced system user, and is the primary reference for the computer modeling software supplied with the system. It is designed for emergency managers and planners, and others familiar with the concepts of computer modeling. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other IBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary.

  11. Baseline review of the U.S. LHC Accelerator project

    SciTech Connect (OSTI)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O`Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  12. Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

    1994-01-01

    This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

  13. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  14. Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  15. Report of the DOE Review Committee on the baseline validation of the Superconducting Super Collider

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The Secretary of Energy directed that an independent review of the current cost and schedule baseline for the SSC be conducted. The purpose of this independent review was to validate the current cost and schedule baseline and to ensure that the project status is accurate as currently reported. Through May 1993, approximately $1.5 billion of the baseline cost of $8.249 billion had been expended, with project completion forecasted on the baseline schedule as of September 1999. This report documents the findings of the SSC Baseline Validation Review Committee (the Committee). The report is organized into five parts. The first section is the Executive Summary. This introduction is followed by a discussion of the project progress/status as determined by the Committee. The next section describes the Committee`s estimate of the cost at completion for the SSC project, followed by an assessment of the adequacy of the business management systems currently being used to manage the project. The final section presents the Committee`s conclusions and recommendations. The main body of the report is followed by the subcommittee reports and appendices.

  16. Mixed waste focus area integrated technical baseline report. Phase I, Volume 2: Revision 0

    SciTech Connect (OSTI)

    1996-01-16

    This document (Volume 2) contains the Appendices A through J for the Mixed Waste Focus Area Integrated Technical Baseline Report Phase I for the Idaho National Engineering Laboratory. Included are: Waste Type Managers` Resumes, detailed information on wastewater, combustible organics, debris, unique waste, and inorganic homogeneous solids and soils, and waste data information. A detailed list of technology deficiencies and site needs identification is also provided.

  17. Data Management Guide: Integrated Baseline System (IBS). Version 2.1

    SciTech Connect (OSTI)

    Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)] Bower Software Services, Kennewick, Washington (United States); Burford, M.J.; Downing, T.R.; Moise, M.C.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States)] Pacific Northwest Lab., Richland, WA (United States)

    1995-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using the site map database.

  18. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  19. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS)...

    Energy Savers [EERE]

    A Integrated Master Schedule (IMS) Initial Baseline Review EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review This EVMS Training Snippet, ...

  20. Integrated Baseline System (IBS). Version 1.03, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R.; Bailey, S.; Bower, J.C.

    1993-01-01

    This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide also includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.

  1. Baseline information development for energy smart schools -- applied research, field testing and technology integration

    SciTech Connect (OSTI)

    Xu, Tengfang; Piette, Mary Ann

    2004-08-05

    The original scope of work was to obtain and analyze existing and emerging data in four states: California, Florida, New York, and Wisconsin. The goal of this data collection was to deliver a baseline database or recommendations for such a database that could possibly contain window and daylighting features and energy performance characteristics of Kindergarten through 12th grade (K-12) school buildings (or those of classrooms when available). In particular, data analyses were performed based upon the California Commercial End-Use Survey (CEUS) databases to understand school energy use, features of window glazing, and availability of daylighting in California K-12 schools. The outcomes from this baseline task can be used to assist in establishing a database of school energy performance, assessing applications of existing technologies relevant to window and daylighting design, and identifying future R&D needs. These are in line with the overall project goals as outlined in the proposal. Through the review and analysis of this data, it is clear that there are many compounding factors impacting energy use in K-12 school buildings in the U.S., and that there are various challenges in understanding the impact of K-12 classroom energy use associated with design features of window glazing and skylight. First, the energy data in the existing CEUS databases has, at most, provided the aggregated electricity and/or gas usages for the building establishments that include other school facilities on top of the classroom spaces. Although the percentage of classroom floor area in schools is often available from the databases, there is no additional information that can be used to quantitatively segregate the EUI for classroom spaces. In order to quantify the EUI for classrooms, sub-metering of energy usage by classrooms must be obtained. Second, magnitudes of energy use for electricity lighting are not attainable from the existing databases, nor are the lighting levels contributed

  2. 2014 Annual Merit review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    review Results Report - Technology Integration 2014 Annual Merit review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities ...

  3. Microsoft PowerPoint - Snippet 3.1A IMS Initial Baseline Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and risk. This snippet is recommended whenever a schedule baseline is created or revised. 1 The Contract is the prevailing document regarding what Earned Value Management ...

  4. 2012 Annual Merit Review Results Report - Technology Integration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Technology Integration 2012 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities 2012_amr_08.pdf (5.98 MB) More Documents & Publications 2013 Annual Merit Review Results Report - Technology Integration 2014 Annual Merit review Results Report - Technology Integration 2011 Annual Merit Review Results Report - Technology Integration

  5. Renewable Diesel from Algal Lipids: An Integrated Baseline for Cost, Emissions, and Resource Potential from a Harmonized Model

    SciTech Connect (OSTI)

    Davis, R.; Fishman, D.; Frank, E. D.; Wigmosta, M. S.; Aden, A.; Coleman, A. M.; Pienkos, P. T.; Skaggs, R. J.; Venteris, E. R.; Wang, M. Q.

    2012-06-01

    The U.S. Department of Energy's Biomass Program has begun an initiative to obtain consistent quantitative metrics for algal biofuel production to establish an 'integrated baseline' by harmonizing and combining the Program's national resource assessment (RA), techno-economic analysis (TEA), and life-cycle analysis (LCA) models. The baseline attempts to represent a plausible near-term production scenario with freshwater microalgae growth, extraction of lipids, and conversion via hydroprocessing to produce a renewable diesel (RD) blendstock. Differences in the prior TEA and LCA models were reconciled (harmonized) and the RA model was used to prioritize and select the most favorable consortium of sites that supports production of 5 billion gallons per year of RD. Aligning the TEA and LCA models produced slightly higher costs and emissions compared to the pre-harmonized results. However, after then applying the productivities predicted by the RA model (13 g/m2/d on annual average vs. 25 g/m2/d in the original models), the integrated baseline resulted in markedly higher costs and emissions. The relationship between performance (cost and emissions) and either productivity or lipid fraction was found to be non-linear, and important implications on the TEA and LCA results were observed after introducing seasonal variability from the RA model. Increasing productivity and lipid fraction alone was insufficient to achieve cost and emission targets; however, combined with lower energy, less expensive alternative technology scenarios, emissions and costs were substantially reduced.

  6. 2013 Peer Review Presentations—Integrated Biorefineries

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Bioenergy Technologies Office hosted its 2013 Project Peer Review on May 20–24, 2015, at the Hilton Mark Center in Alexandria, Virginia. The presentations from integrated biorefineries session are available to view and download below. For detailed session descriptions and presentation titles, view the 2013 Project Peer Review Program Booklet.

  7. NEPA and CEQA: Integrating State and Federal Environmental Reviews...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft) The Council on ... & Publications NEPA and CEQA: Integrating State and Federal Environmental Reviews (Final

  8. 2011 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration 2011 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities 2011amr08.pdf (2.31 MB) More ...

  9. 2008 Annual Merit Review Results Summary - 16. Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6. Technology Integration and Education 2008 Annual Merit Review Results Summary - 16. Technology Integration and Education DOE Vehicle Technologies Annual Merit Review ...

  10. 2013 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration 2013 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities 2013amr08.pdf (3.15 MB) More ...

  11. 2012 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration 2012 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities 2012amr08.pdf (5.98 MB) More ...

  12. Review of Variable Generation Integration Charges

    SciTech Connect (OSTI)

    Porter, K.; Fink, S.; Buckley, M.; Rogers, J.; Hodge, B. M.

    2013-03-01

    The growth of wind and solar generation in the United States, and the expectation of continued growth of these technologies, dictates that the future power system will be operated in a somewhat different manner because of increased variability and uncertainty. A small number of balancing authorities have attempted to determine an 'integration cost' to account for these changes to their current operating practices. Some balancing authorities directly charge wind and solar generators for integration charges, whereas others add integration charges to projected costs of wind and solar in integrated resource plans or in competitive solicitations for generation. This report reviews the balancing authorities that have calculated variable generation integration charges and broadly compares and contrasts the methodologies they used to determine their specific integration charges. The report also profiles each balancing authority and how they derived wind and solar integration charges.

  13. 2011 Biomass Program Platform Peer Review: Integrated Biorefineries...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Biorefineries 2011 Biomass Program Platform Peer Review: Integrated ... experts at the U.S. Department of Energy Biomass Programs Integrated Biorefinery ...

  14. Vandenberg Air Force Base integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Halverson, M.A.; Richman, E.E.; Dagle, J.E.; Hickman, B.J.; Daellenbach, K.K.; Sullivan, G.P.

    1993-06-01

    The US Air Force Space Command has tasked the Pacific Northwest Laboratory, as the lead laboratory supporting the US Department of Energy Federal Energy Management Program, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is a model program PNL is designing for federal customers served by the Pacific Gas and Electric Company (PG and E). The primary goal of the VAFB project is to identify all electric energy efficiency opportunities, and to negotiate with PG and E to acquire those resources through a customized demand-side management program for its federal clients. That customized program should have three major characteristics: (1) 100% up-front financing; (2) substantial utility cost-sharing; and (3) utility implementation through energy service companies under contract to the utility. A similar arrangement will be pursued with Southern California Gas for non-electric resource opportunities if that is deemed desirable by the site and if the gas utility seems open to such an approach. This report documents the assessment of baseline energy use at VAFB located near Lompoc, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Resource Assessment. This analysis examines the characteristics of electric, natural gas, fuel oil, and propane use for fiscal year 1991. It records energy-use intensities for the facilities at VAFB by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A more complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, and applicable losses.

  15. EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review EVMS Training Snippet: 4.6 Baseline Control Methods EVMS Training Snippet: 4.9 High-level EVM...

  16. Commercial Buildings Integration Program Overview- 2013 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Program Presentation for the 2013 Building Technologies Office's Program Peer Review

  17. Integrated Dry NO sub x /SO sub 2 Emissions Control System baseline test report, November 11--December 15, 1991

    SciTech Connect (OSTI)

    Shiomoto, G.H.; Smith, R.A.

    1992-03-01

    The DOE sponsored Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System program, which is a Clean Coal Technology Ill demonstration, is being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, which is a 100 MWe, down-fired utility boiler burning a low sulfur western coal. The project goal is to demonstrate 70 percent reductions in NO{sub x} and S0{sub 2} emissions through the integration of: (1) down-fired low-NO{sub x} burners with overfire air; (2) urea injection for additional NO{sub x} removal; and (3) dry sorbent injection and duct humidification for SO{sub 2} removal. The effectiveness of the integrated system on a high sulfur coal will also be tested. This report documents the first baseline test results conducted during the program. The baseline tests were conducted with the original burners and auxiliary equipment and represent the unmodified boiler emissions. The burner design of Arapahoe Unit 4 results in relatively high NO{sub x} levels ranging from 740 to 850 ppM (corrected to 3% O{sub 2}, dry) over the load range. Excess air level was the primary factor influencing NO{sub x} emissions. During normal boiler operations, there was a wide range in NO{sub x} emissions, due to the variations of excess air, boiler load and other, secondary parameters. SO{sub 2} emissions ranged from 350 to 600 ppM (corrected to 3% O{sub 2}, dry) and reflected variations in the coal sulfur content.

  18. 2009 Integrated Biorefinery Platform Review Report

    SciTech Connect (OSTI)

    Ferrell, John

    2009-12-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy Biomass Program‘s Integrated Biorefinery (IBR) platform review meeting, held on February 18–19, 2009, at the Westin National Harbor, National Harbor, Maryland.

  19. Vehicle Technologies Office Merit Review 2014: Impact Analysis: VTO Baseline and Scenario (BaSce) Activities

    Broader source: Energy.gov [DOE]

    Presentation given by Argonne National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about impact analysis...

  20. Integrated review software advances at Los Alamos

    SciTech Connect (OSTI)

    Klosterbuer, S. F.; Michel, K. D.; Betts, S. E.; Determan, J. C.; Longo, J. F.; Parker, R. F.; Pelowitz, D. G.; Rothrock, R. B.; Schneider, C. M.; Nordquist, H. M.

    2004-01-01

    Since 1988, Los Alamos National Laboratory (LANL) has been developing software for unattended monitoring systems. These systems are composed of three categories of software: acquisition, collection and review. The data acquisition software is contained in modular instrumentation distributed throughout facilities to continuously acquire data from devices ranging from radiation detectors to cameras to binary switches. The data collection software runs on computers connected to the instruments and offloads and stores the acquired data. The review software enables the end user to quickly and easily examine the data collected from these different systems and compare the results to declared operator activities. This paper addresses the review software. The original standalone review software processed only radiation data. This software was expanded to include new programs (tools) to display and correlate video and operator declarations and added an interface to the standard neutron coincidence counter analysis program. This expanded review software containing multiple review tools is referred to collectively as the Integrated Review Software (IRS). The IRS continues to expand and evolve. Two primary IRS developments will be described in this paper. First, the IRS was expanded to include review tools to display and analyze new data types. Position Review was developed to display Global Positioning System (GPS) location data to aid in tracking radiation movements. Isotopic Review is being developed to provide a link to the standard gamma isotopic analysis software. In addition significant enhancements are being added to the existing review tools such as Operator Review, Radiation Review and Digital Video Review. A second IRS development is to produce standardized components with published interfaces enabling other parties to produce custom components that plug into review software. It is anticipated that there will be four primary types of components that could be

  1. Modular integrated video system (MIVS) review station

    SciTech Connect (OSTI)

    Garcia, M.L.

    1988-01-01

    An unattended video surveillance unit, the Modular Integrated Video System (MIVS), has been developed by Sandia National Laboratories for International Safeguards use. An important support element of this system is a semi-automatic Review Station. Four component modules, including an 8 mm video tape recorder, a 4-inch video monitor, a power supply and control electronics utilizing a liquid crystal display (LCD) are mounted in a suitcase for probability. The unit communicates through the interactive, menu-driven LCD and may be operated on facility power through the world. During surveillance, the MIVS records video information at specified time intervals, while also inserting consecutive scene numbers and tamper event information. Using either of two available modes of operation, the Review Station reads the inserted information and counts the number of missed scenes and/or tamper events encountered on the tapes, and reports this to the user on the LCD. At the end of a review session, the system will summarize the results of the review, stop the recorder, and advise the user of the completion of the review. In addition, the Review Station will check for any video loss on the tape.

  2. National integrated mitigation planning in agriculture: A review...

    Open Energy Info (EERE)

    National integrated mitigation planning in agriculture: A review paper This review of national greenhouse gas (GHG) mitigation planning in the agriculture sector has two...

  3. CRAD, Integrated Safety Basis and Engineering Design Review ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Basis and Engineering Design Review - August 20, 2014 (EA CRAD 31-4, Rev. 0) CRAD, Integrated Safety Basis and Engineering Design Review - August 20, 2014 (EA...

  4. Vehicle Technologies Office Merit Review 2015: Integrated Computationa...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineering Approach to Development of Lightweight 3GAHSS Vehicle Assembly Vehicle Technologies Office Merit Review 2015: Integrated Computational Materials Engineering ...

  5. Commercial Buildings Integration Program Overview- 2015 BTO Peer Review

    Broader source: Energy.gov [DOE]

    This presentation at the 2015 Peer Review provided an overview of the Building Technologies Office's Commercial Buildings Integration Program.

  6. Residential Buildings Integration Program Overview - 2016 BTO Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Residential Buildings Integration Program Overview - 2016 BTO Peer Review Residential Buildings Integration Program Overview - 2016 BTO Peer Review Presenter: David Lee, U.S. Department of Energy This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. 2016 BTO Peer Review

  7. MHD Technology Transfer, Integration and Review Committee

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    As part of the MHD Integrated Topping Cycle (ITC) project, TRW was given the responsibility to organize, charter and co-chair, with the Department of Energy (DOE), an MHD Technology Transfer, Integration and Review Committee (TTIRC). The Charter of the TTIRC, which was approved by the DOE in June 1988 and distributed to the committee members, is included as part of this Summary. As stated in the Charter, the purpose of this committee is to: (1) review all Proof-of-Concept (POC) projects and schedules in the national MHD program; to assess their compatibility with each other and the first commercial MHD retrofit plant; (2) establish and implement technology transfer formats for users of this technology; (3) identify interfaces, issues, and funding structures directly impacting the success of the commercial retrofit; (4) investigate and identify the manner in which, and by whom, the above should be resolved; and (5) investigate and assess other participation (foreign and domestic) in the US MHD Program. The DOE fiscal year 1989 MHD Program Plan Schedule is included at the end of this Summary. The MHD Technology Transfer, Integration and Review Committee's activities to date have focused primarily on the technology transfer'' aspects of its charter. It has provided a forum for the dissemination of technical and programmatic information among workers in the field of MHD and to the potential end users, the utilities, by holding semi-annual meetings. The committee publishes this semi-annual report, which presents in Sections 2 through 11 capsule summaries of technical progress for all DOE Proof-of-Concept MHD contracts and major test facilities.

  8. 2008 Annual Merit Review Results Summary - 16. Technology Integration and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Education | Department of Energy 6. Technology Integration and Education 2008 Annual Merit Review Results Summary - 16. Technology Integration and Education DOE Vehicle Technologies Annual Merit Review 2008_merit_review_16.pdf (938.26 KB) More Documents & Publications 2008 Annual Merit Review Results Summary - 5. Advanced Power Electronics 2008 Annual Merit Review Results Summary - 14. Vehicle Systems and Simulation 2008 Annual Merit Review Results Summary - 10. Fuels Technologies

  9. Hazard baseline documentation

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This DOE limited technical standard establishes uniform Office of Environmental Management (EM) guidance on hazards baseline documents that identify and control radiological and nonradiological hazards for all EM facilities. It provides a road map to the safety and health hazard identification and control requirements contained in the Department`s orders and provides EM guidance on the applicability and integration of these requirements. This includes a definition of four classes of facilities (nuclear, non-nuclear, radiological, and other industrial); the thresholds for facility hazard classification; and applicable safety and health hazard identification, controls, and documentation. The standard applies to the classification, development, review, and approval of hazard identification and control documentation for EM facilities.

  10. Residential Buildings Integration Program Overview - 2014 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4 BTO Peer Review Residential Buildings Integration Program Overview - 2014 BTO Peer Review Presenter: David Lee, U.S. Department of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. View the presentation Residential Buildings Integration Program Overview - 2014 BTO

  11. Residential Buildings Integration Program Overview - 2015 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 BTO Peer Review Residential Buildings Integration Program Overview - 2015 BTO Peer Review Presenter: David Lee, U.S. Department of Energy This presentation at the 2015 Peer Review provided an overview of the Building Technologies Office's Residential Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. VIEW THE PRESENTATION Residential Buildings Integration Program Overview - 2015 BTO

  12. 2014 Annual Merit review Results Report - Technology Integration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy review Results Report - Technology Integration 2014 Annual Merit review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities 2014_amr_08.pdf (3.56 MB) More Documents & Publications Vehicle Technologies Office Merit Review 2014: Advancing Alternative Fuel Markets in Florida Vehicle Technologies Office Merit Review 2014: Removing Barriers, Implementing Policies and Advancing Alternative Fuels Markets in New England

  13. Microsoft PowerPoint - Snippet 4.2 Integrated Baseline Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its relationship to the underlying Earned Value Management (EVM) systems and processes ... process risk areas, as well as develop confidence in the project's operating plans. ...

  14. Commercial Buildings Integration Program Overview — 2016 BTO Peer Review

    Broader source: Energy.gov [DOE]

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office’s Commercial Buildings Integration Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  15. Vehicle Technologies Office Merit Review 2015: Integrated Network...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Integrated Network Testbed for Energy Grid Research and...

  16. 2013 Annual Merit Review Results Report - Technology Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review Results Report - Technology Integration EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT,...

  17. Review of the Sodium Bearing Waste Treatment Project - Integrated...

    Office of Environmental Management (EM)

    Verification Review IWTU Integrated Waste Treatment Unit LCO Limiting Condition for ... Analysis Report SBWTP Sodium Bearing Waste Treatment Project SMP Safety Management ...

  18. Independent Oversight Review of Integrated Safety Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on LSO's most recent assessment of LLNL's contractor ... and the request for peer reviews and independent HSS reviews, show that LSO is a learning organization and that ...

  19. 2011 Biomass Program Platform Peer Review: Integrated Biorefineries

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INTEGRATED BIOREFINERIES 2011 Platform Review Report An Independent Evaluation of Platform Activities for FY 2010 and FY 2011 Review Date February 1-3, 2011 February 2012 Department of Energy Washington, D.C. 20585 Dear Colleague: This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy Biomass Program's Integrated Biorefnery Platform Review meeting, held on February 1-3, 2011, at the U.S. Department of

  20. 2013 Annual Merit Review Results Report - Technology Integration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Technology Integration 2013 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities 2013_amr_08.pdf (3.15 MB) More Documents & Publications EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT, MA, RI, CT, NY, NJ, PA, DE, MD, DC) Vehicle Technologies Office Merit Review 2014: Penn State DOE Graduate GATE Program for In-Vehicle,

  1. Biomass Program 2007 Peer Review - Integrated Biorefinery Platform Summary

    SciTech Connect (OSTI)

    none,

    2009-10-27

    This document discloses the comments provided by a review panel at the U.S. Department of Energy Office of the Biomass Program Peer Review held on November 15-16, 2007 in Baltimore, MD and the Integrated Biorefinery Platform Review held on August 13-15, 2007 in Golden, Colorado.

  2. NREL: Transmission Grid Integration - Technical Review Committee...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), the Utility Wind ... for Integration Studies Glossary News Did you find what you needed? ...

  3. 2011 Biomass Program Platform Peer Review: Integrated Biorefineries |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Integrated Biorefineries 2011 Biomass Program Platform Peer Review: Integrated Biorefineries "This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy Biomass Programs Integrated Biorefinery Platform Review meeting, held on February 1...3, 2011, at the U.S. Department of Energy, Washington, D.C." 2011_ibr_review.pdf (2.52 MB) More Documents & Publications 2011

  4. 2011 Annual Merit Review Results Report - Technology Integration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Technology Integration 2011 Annual Merit Review Results Report - Technology Integration Merit review of DOE Vehicle Technologies research activities 2011_amr_08.pdf (2.31 MB) More Documents & Publications Penn State DOE Graduate Automotive Technology Education (Gate) Program for In-Vehicle, High-Power Energy Storage Systems PENN STATE DOE GRADUATE AUTOMOTIVE TECHNOLOGY EDUCATION (GATE) PROGRAM FOR EcoCAR the Next Generation

  5. Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System baseline test report, November 11--December 15, 1991

    SciTech Connect (OSTI)

    Shiomoto, G.H.; Smith, R.A.

    1992-03-01

    The DOE sponsored Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System program, which is a Clean Coal Technology Ill demonstration, is being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, which is a 100 MWe, down-fired utility boiler burning a low sulfur western coal. The project goal is to demonstrate 70 percent reductions in NO{sub x} and S0{sub 2} emissions through the integration of: (1) down-fired low-NO{sub x} burners with overfire air; (2) urea injection for additional NO{sub x} removal; and (3) dry sorbent injection and duct humidification for SO{sub 2} removal. The effectiveness of the integrated system on a high sulfur coal will also be tested. This report documents the first baseline test results conducted during the program. The baseline tests were conducted with the original burners and auxiliary equipment and represent the unmodified boiler emissions. The burner design of Arapahoe Unit 4 results in relatively high NO{sub x} levels ranging from 740 to 850 ppM (corrected to 3% O{sub 2}, dry) over the load range. Excess air level was the primary factor influencing NO{sub x} emissions. During normal boiler operations, there was a wide range in NO{sub x} emissions, due to the variations of excess air, boiler load and other, secondary parameters. SO{sub 2} emissions ranged from 350 to 600 ppM (corrected to 3% O{sub 2}, dry) and reflected variations in the coal sulfur content.

  6. Joint Integration Office Independent Review Committee annual report, 1985

    SciTech Connect (OSTI)

    Not Available

    1986-08-01

    Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular research and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting group, under an independent charter providing objective review of program activities. This report summarizes the 12 major topics reviewed by the committee during 1985.

  7. NEPA and CEQA: Integrating State and Federal Environmental Reviews (Final)

    Office of Energy Efficiency and Renewable Energy (EERE)

    CEQ and the California Governor’s Office of Planning and Research (OPR) have jointly prepared the handbook “NEPA and CEQA: Integrating Federal and State Environmental Reviews.” The handbook provides practitioners with an overview of NEPA and CEQA as well as suggestions for developing a single environmental review process that can meet the requirements of both statutes. The handbook also provides a framework for a Memorandum of Understanding (MOU) between two or more agencies entering into a joint NEPA/ CEQA review process, and addresses the California Energy Commission licensing process, which takes the place of the CEQA process for certain power plants

  8. CD-2, Approve Performance Baseline | Department of Energy

    Office of Environmental Management (EM)

    ... External Independent Review (EIR), Independent Project Review (IPR), Independent Cost Estimate (ICE) Perform a Performance Baseline External Independent Review (EIR) or an ...

  9. Advanced Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review Advanced Variable Speed Air-Source Integrated Heat Pump 2013 Peer Review Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review Advanced Variable Speed Integrated Heat Pump - 2013 Peer Review Presentation (698.52 KB) More Documents & Publications Advanced variable-speed Air Source Integrated Heat Pump prototype system and field test site near Knoxville, TN Credit:

  10. Review of consolidated Edison`s integrated resource bidding program

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Baldick, R.; Milne, A.

    1993-07-01

    Competitive bidding has emerged as the dominant method for procuring new resources by US utilities. In New York, the Public Service Commission (NYPSC) ordered the state`s seven investor-owned utilities to develop bidding programs to acquire supply and DSM resource options. Utilities were allowed significant discretion in program design in order to encourage experimentation. Competitive bidding programs pose formidable policy, design, and management challenges for utilities and their regulators. Yet, there have been few detailed case studies of bidding programs, particularly of those utilities that take on the additional challenge of having supply and DSM resources compete head-to-head for a designated block of capacity. To address that need, the New York State Energy Research and Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the bidding programs of two utilities that tested the integrated ``all-sources`` approach. This study focuses primarily on Consolidated Edison Company of New York`s (Con Edison) bidding program; an earlier report discusses our review of Niagara Mohawk`s program (Goldman et al 1992). We reviewed relevant Commission decisions, utility filings and signed contracts, interviewed utility and regulatory staff, surveyed DSM bidders and a selected sample of DSM non-bidders, and analyzed the bid evaluation system used in ranking bids based on detailed scoring information on individual bids provided by Con Edison.

  11. Long-Baseline Neutrino Experiment (LBNE)Water Cherenkov Detector Basis of Estimate Forms and Backup Documentation LBNE Far Site Internal Review (December 6-9, 2011)

    SciTech Connect (OSTI)

    Stewart J.; Diwan, M.; Dolph, J.; Novakova, P.; Sharma, R.; Stewart, J.; Viren, B.; Russo, T.; Kaducak, M.; Mantsch, P.; Paulos, B.; Feyzi, F.; Sullivan, G.; Bionta, R.; Fowler, J.; Warner, D.; Bahowick, S.; Van Berg, R.; Kearns, E.; Hazen, E.; Sinnis, G.; Sanchez, M.

    2011-12-09

    Basis of Estimate (BOE) forms and backup documentation developed for the Water Cherenkov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  12. Long-Baseline Neutrino Experiment (LBNE) Water Cherenkov Detector Schedule and Cost Books LBNE Far Site Internal Review(December 6-9,2011)

    SciTech Connect (OSTI)

    Stewart J.; Diwan, M.; Dolph, J.; Novakova, P.; Sharma, R.; Stewart, J.; Viren, B.; Russo, T.; Kaducak, M.; Mantsch, P.; Paulos, B.; Feyzi, F.; Sullivan, G.; Bionta, R.; Fowler, J.; Warner, D.; Bahowick, S.; Van Berg, R.; Kearns, E.; Hazen, E.; Sinnis, G.; Sanchez, M.

    2011-12-09

    Schedule and Cost Books developed for the Water Cherenkov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  13. CyberGIS software: a synthetic review and integration roadmap

    SciTech Connect (OSTI)

    Wang, Shaowen; Anselin, Luc; Bhaduri, Budhendra L; Cosby, Christopher; Goodchild, Michael; Liu, Yan; Nygers, Timothy L.

    2013-01-01

    CyberGIS defined as cyberinfrastructure-based geographic information systems (GIS) has emerged as a new generation of GIS representing an important research direction for both cyberinfrastructure and geographic information science. This study introduces a 5-year effort funded by the US National Science Foundation to advance the science and applications of CyberGIS, particularly for enabling the analysis of big spatial data, computationally intensive spatial analysis and modeling (SAM), and collaborative geospatial problem-solving and decision-making, simultaneously conducted by a large number of users. Several fundamental research questions are raised and addressed while a set of CyberGIS challenges and opportunities are identified from scientific perspectives. The study reviews several key CyberGIS software tools that are used to elucidate a vision and roadmap for CyberGIS software research. The roadmap focuses on software integration and synthesis of cyberinfrastructure, GIS, and SAM by defining several key integration dimensions and strategies. CyberGIS, based on this holistic integration roadmap, exhibits the following key characteristics: high-performance and scalable, open and distributed, collaborative, service-oriented, user-centric, and community-driven. As a major result of the roadmap, two key CyberGIS modalities gateway and toolkit combined with a community-driven and participatory approach have laid a solid foundation to achieve scientific breakthroughs across many geospatial communities that would be otherwise impossible.

  14. Review of integrated resource bidding at Niagara Mohawk

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Stoft, S.S.; Cohen, S.

    1992-05-01

    In June 1988, the New York Public Service Commission (PSC) ordered the state's investor-owned utilities to develop competitive bidding programs that included both supply and demandside resource options. The New York State Energy Research Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy's Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the integrated bidding processes of two New York utilities, Niagara Mohawk and Consolidated Edison. This interim report focuses on Niagara Mohawk (NMPC). In terms of overall approach, our analysis is intended as a critical review of a large-scale experiment in competitive resource acquisition implemented by New York utilities at the direction of their state regulators. The study is not a formal impact or process evaluation. Based on priorities established jointly with project sponsors, the report focuses on selected topics: analysis of the two-stage scoring system used by NMPC, ways that the scoring system can be improved, an in-depth review of the DSM bidding component of the solicitation including surveys of DSM bidders, relationship between DSM bidding and other utility-sponsored DSM programs, and major policy issues that arise in the design and implementation of competitive resource procurements. The major findings of this report are: NMPC's solicitation elicited an impressive response from private power developers and energy service companies. In the initial ranking of bids, DSM projects were awarded significantly more points on price and environmental factors compared to supply-side bids. NMPC's scoring system gave approximately twice as much weight nominally to price as to non-price factors (850 vs. 460 points).

  15. Review of integrated resource bidding at Niagara Mohawk

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Stoft, S.S.; Cohen, S.

    1992-05-01

    In June 1988, the New York Public Service Commission (PSC) ordered the state`s investor-owned utilities to develop competitive bidding programs that included both supply and demandside resource options. The New York State Energy Research & Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the integrated bidding processes of two New York utilities, Niagara Mohawk and Consolidated Edison. This interim report focuses on Niagara Mohawk (NMPC). In terms of overall approach, our analysis is intended as a critical review of a large-scale experiment in competitive resource acquisition implemented by New York utilities at the direction of their state regulators. The study is not a formal impact or process evaluation. Based on priorities established jointly with project sponsors, the report focuses on selected topics: analysis of the two-stage scoring system used by NMPC, ways that the scoring system can be improved, an in-depth review of the DSM bidding component of the solicitation including surveys of DSM bidders, relationship between DSM bidding and other utility-sponsored DSM programs, and major policy issues that arise in the design and implementation of competitive resource procurements. The major findings of this report are: NMPC`s solicitation elicited an impressive response from private power developers and energy service companies. In the initial ranking of bids, DSM projects were awarded significantly more points on price and environmental factors compared to supply-side bids. NMPC`s scoring system gave approximately twice as much weight nominally to price as to non-price factors (850 vs. 460 points).

  16. NASA technical baseline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Twitter Google + Vimeo GovDelivery SlideShare SunShot Grand Challenge: Regional Test Centers NASA technical baseline HomeTag:NASA technical baseline Curiosity's multi-mission ...

  17. Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review Develop Standard Method of Test for Integrated Heat Pump - 2013 Peer Review Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review emrgtech06_reedy_040213.pdf (403.24 KB) More Documents & Publications Working Fluids Low Global Warming Potential Refrigerants - 2013 Peer Review Multi-Function Fuel-Fired Heat Pump - 2013 Peer Review Buildings Performance

  18. Vehicle Technologies Office Merit Review 2015: Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

    Broader source: Energy.gov [DOE]

    Presentation given by Eaton at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about integrated boosting and hybridization...

  19. Hazard Baseline Documentation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-12-04

    This standard establishes uniform Office of Environmental Management (EM) guidance on hazard baseline documents that identify and control radiological and non-radiological hazards for all EM facilities.

  20. NEPA and CEQA: Integrating State and Federal Environmental Reviews...

    Office of Environmental Management (EM)

    Reviews (Final) CEQ and the California Governor's Office of Planning and ... CEQA review process, and addresses the California Energy Commission licensing process, ...

  1. 2014 WIND POWER PROGRAM PEER REVIEW-ADVANCED GRID INTEGRATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Grid Integration March 24-27, 2014 Wind Energy Technologies PR-5000-62152 2 Contents Advanced Grid Integration Eastern Renewable Generation Integration Study (ERGIS)-Barbara O'Neill, National Renewable Energy Laboratory Western Wind and Solar Integration Study - Phase 2 and Phase 3-Kara Clark, National Renewable Energy Laboratory Integration Support/UVIG-Michael Milligan, National Renewable Energy Laboratory Mid-Atlantic Offshore Wind Interconnection and Transmission-Willett Kempton,

  2. Physical Infrastructure Integration for Trinity, ASC L2 Milestone Review

    SciTech Connect (OSTI)

    Sena, Phillip A.

    2015-09-11

    Design, build, and integrate under-floor electrical and water-cooling distribution system for Trinity/ATS-1 platform.

  3. NREL: Technology Transfer - NREL and Partners Review Integration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integration Studies, Show Wind and Solar Can Support Proposed EPA Goal of 30% Carbon Dioxide Emissions Reduction June 15, 2015 The proposed Environmental Protection Agency (EPA)...

  4. Review and Status of Wind Integration and Transmission in the...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Smith Utility Variable Generation Integration Group Beth ... cost from the National Renewable Energy Laboratory (NREL) at ... could be built to a site prior to that site being ...

  5. Vehicle Technologies Office Merit Review 2014: PEV Integration with Renewables

    Broader source: Energy.gov [DOE]

    Presentation given by National Renewable Energy Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about PEV...

  6. Vehicle Technologies Office Merit Review 2015: PEV / Grid Integration Study

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by Pacific Northwest National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about PEV /...

  7. Vehicle Technologies Office Merit Review 2015: Electric Vehicle Grid Integration

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by National Renewable Energy Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about electric...

  8. Vehicle Technologies Office Merit Review 2015: Enabling High-Energy/Voltage Lithium-Ion Cells for Transportation Applications: Part 1 Baseline Protocols and Analysis

    Broader source: Energy.gov [DOE]

    Presentation given by Argonne National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about enabling high...

  9. Commercial Building Integration Program Overview- 2014 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Presenter: Arah Schuur, U.S. Department of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Appliance and Equipment Standards Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  10. Idaho National Laboratory Integrated Safety Management System 2010 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Thomas J. Haney

    2010-12-01

    Idaho National Laboratory completes an annual Integrated Safety Management System effectiveness review per 48 CFR 970.5223-1 “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assesses ISMS effectiveness, provides feedback to maintain system integrity, and helps identify target areas for focused improvements and assessments for the following year. Using one of the three Department of Energy (DOE) descriptors in DOE M 450.4-1 regarding the state of ISMS effectiveness during Fiscal Year (FY) 2010, the information presented in this review shows that INL achieved “Effective Performance.”

  11. Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System baseline SNCR test report, February 4--March 6, 1992

    SciTech Connect (OSTI)

    Smith, R.A.; Shiomoto, G.H.; Muzio, L.J.; Hunt, T.

    1993-09-01

    The DOE sponsored Integrated Dry NO{sub x}SO{sub 2} Emissions Control System program, which is a Clean Coal Technology III demonstration, is being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, which is a 100 MWe, down-fired utility boiler burning a low sulfur western coal. The project goal is to demonstrate 70 percent reductions in NO{sub x} and SO{sub 2} emissions through the integration of: (1) down-fired low-NO{sub x} burners with overfire air; (2) selective Non-Catalytic Reduction (SNCR) for additional NO{sub x} removal; and (3) dry sorbent injection and duct humidification for SO{sub 2} removal. The effectiveness of the integrated system on a high-sulfur coal will also be tested. This report documents the second test phase of the program. This second test phase was comprised of the start up of the SNCR system followed by a brief parametric test series. Time constraints due to the retrofit schedule precluded optimizing the SNCR system. Testing investigated both urea and aqueous ammonia as SNCR chemicals. Other parameters investigated included boiler load, the amount of chemical injected, as well as injection parameters (injection location, amount of mixing air, dilution water flow, and injector orifice sizes). NO{sub x} removals of nominally 35 percent could be obtained with both chemicals while maintaining ammonia slip levels less than 10 ppM at full load. At higher chemical injection rates (nominal N/NO molar ratios of 1.5 to 2.0), NO{sub x} reductions in the range of 60 to 70 percent were achieved, but with unacceptable levels of NH{sub 3} slip. For a given level of NO{sub x} reduction, ammonia slip was lower with aqueous ammonia injection than with urea. The test program also confirmed prior observations that (1) the optimum temperature for NO{sub x} reduction with ammonia is lower than with urea, and (2) N{sub 2}O emissions as a by-product of the SNCR process are lower for ammonia compared to urea.

  12. NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)

    Broader source: Energy.gov [DOE]

    The Council on Environmental Quality (CEQ), in collaboration with the California Governor’s Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and...

  13. 2011 Biomass Program Platform Peer Review. Integrated Biorefineries

    SciTech Connect (OSTI)

    Rossmeissl, Neil

    2012-02-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2011 U.S. Department of Energy Biomass Program’s IBR Platform Review meeting.

  14. Vehicle Technologies Office Merit Review 2014: Technology Integration Overview

    Broader source: Energy.gov [DOE]

    Presentation given by U.S. Department of Energy at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting providing an overview of...

  15. Vehicle Technologies Office Merit Review 2016: Technology Integration Overview

    Broader source: Energy.gov [DOE]

    Presentation given by Department of Energy (DOE) at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Technology...

  16. Integrated nonlinear photonics: Emerging applications and ongoing challenges - A mini review

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hendrickson, Scott M.; Foster, Amy C.; Camacho, Ryan M.; Clader, B. David

    2014-11-26

    In this paper, we provide a review of recent progress in integrated nonlinear photonics with a focus on emerging applications in all-optical signal processing, ultra-low-power all-optical switching, and quantum information processing.

  17. Integrated nonlinear photonics. Emerging applications and ongoing challenges - A mini review

    SciTech Connect (OSTI)

    Hendrickson, Scott M.; Foster, Amy C.; Camacho, Ryan M.; Clader, B. David

    2014-11-26

    In this paper, we provide a review of recent progress in integrated nonlinear photonics with a focus on emerging applications in all-optical signal processing, ultra-low-power all-optical switching, and quantum information processing.

  18. Integration & Scale-Up Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    oil Technology Area Review Esther Wilcox March 23 rd , 2015 2015 DOE Bioenergy Technologies Office (BETO) Project Peer Review This presentation does not contain any proprietary, confidential, or otherwise restricted information Integration & Scale-Up WBS 2.4.1.301 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. 2 Goal Statement Integrate and scale-up pyrolysis technologies

  19. Transportation Baseline Report

    SciTech Connect (OSTI)

    Fawcett, Ricky Lee; Kramer, George Leroy Jr.

    1999-12-01

    The National Transportation Program 1999 Transportation Baseline Report presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste and materials transportation. In addition, this Report provides a summary overview of DOEs projected quantities of waste and materials for transportation. Data presented in this report were gathered as a part of the IPABS Spring 1999 update of the EM Corporate Database and are current as of July 30, 1999. These data were input and compiled using the Analysis and Visualization System (AVS) which is used to update all stream-level components of the EM Corporate Database, as well as TSD System and programmatic risk (disposition barrier) information. Project (PBS) and site-level IPABS data are being collected through the Interim Data Management System (IDMS). The data are presented in appendices to this report.

  20. Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2011-12-01

    Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

  1. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

  2. Annual Technology Baseline

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis. This primary product of the Annual Technology Baseline (ATB) project component includes detailed cost and performance data (both current and projected) for both renewable and conventional technologies. This data is presented in MS Excel.

  3. Pinellas Plant Environmental Baseline Report

    SciTech Connect (OSTI)

    Not Available

    1997-06-01

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  4. TWRS baseline system description

    SciTech Connect (OSTI)

    Lee, A.K.

    1995-03-28

    This document provides a description of the baseline system conceptualized for remediating the tank waste stored within the Hanford Site. Remediation of the tank waste will be performed by the Tank Waste Remediation System (TWRS). This baseline system description (BSD) document has been prepared to describe the current planning basis for the TWRS for accomplishing the tank waste remediation functions. The BSD document is not intended to prescribe firm program management strategies for implementing the TWRS. The scope of the TWRS Program includes managing existing facilities, developing technology for new systems; building, testing and operating new facilities; and maintaining the system. The TWRS Program will manage the system used for receiving, safely storing, maintaining, treating, and disposing onsite, or packaging for offsite disposal, all tank waste. The scope of the TWRS Program encompasses existing facilities such as waste storage tanks, evaporators, pipelines, and low-level radioactive waste treatment and disposal facilities. It includes support facilities that comprise the total TWRS infrastructure, including upgrades to existing facilities or equipment and the addition of new facilities.

  5. 241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Gunter, Jason R.

    2013-08-26

    This report provides the results of an extent of condition construction history review for tank 241-AY-101. The construction history of tank 241-AY-101 has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In tank 241-AY-101, the second double-shell tank constructed, similar issues as those with tank 241-AY-102 construction reoccurred. The overall extent of similary and affect on tank 241-AY-101 integrity is described herein.

  6. 241-AW Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Gunter, Jason R.; Reeploeg, Gretchen E.

    2013-11-19

    This report provides the results of an extent of condition construction history review for the 241-AW tank farm. The construction history of the 241-AW tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AW tank farm, the fourth double-shell tank farm constructed, similar issues as those with tank 241-AY-102 construction occured. The overall extent of similary and affect on 241-AW tank farm integrity is described herein.

  7. Vehicle Technologies Office Merit Review 2014: Integrated Computational Materials Engineering Approach to Development of Lightweight 3GAHSS Vehicle Assembly

    Broader source: Energy.gov [DOE]

    Presentation given by USAMP at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about integrated computational materials...

  8. Vehicle Technologies Office Merit Review 2015: Integrated Computational Materials Engineering Approach to Development of Lightweight 3GAHSS Vehicle Assembly

    Broader source: Energy.gov [DOE]

    Presentation given by USAMP at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about integrated computational materials...

  9. Baseline Test Specimen Machining Report

    SciTech Connect (OSTI)

    mark Carroll

    2009-08-01

    The Next Generation Nuclear Plant (NGNP) Project is tasked with selecting a high temperature gas reactor technology that will be capable of generating electricity and supplying large amounts of process heat. The NGNP is presently being designed as a helium-cooled high temperature gas reactor (HTGR) with a large graphite core. The graphite baseline characterization project is conducting the research and development (R&D) activities deemed necessary to fully qualify nuclear-grade graphite for use in the NGNP reactor. Establishing nonirradiated thermomechanical and thermophysical properties by characterizing lot-to-lot and billet-to-billet variations (for probabilistic baseline data needs) through extensive data collection and statistical analysis is one of the major fundamental objectives of the project. The reactor core will be made up of stacks of graphite moderator blocks. In order to gain a more comprehensive understanding of the varying characteristics in a wide range of suitable graphites, any of which can be classified as nuclear grade, an experimental program has been initiated to develop an extensive database of the baseline characteristics of numerous candidate graphites. Various factors known to affect the properties of graphite will be investigated, including specimen size, spatial location within a graphite billet, specimen orientation within a billet (either parallel to [P] or transverse to [T] the long axis of the as-produced billet), and billet-to-billet variations within a lot or across different production lots. Because each data point is based on a certain position within a given billet of graphite, particular attention must be paid to the traceability of each specimen and its spatial location and orientation within each billet. The evaluation of these properties is discussed in the Graphite Technology Development Plan (Windes et. al, 2007). One of the key components in the evaluation of these graphite types will be mechanical testing on

  10. Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

    Office of Environmental Management (EM)

    Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background

  11. 2016 Annual Technology Baseline (ATB) (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Conference: 2016 Annual Technology Baseline (ATB) Citation Details In-Document Search Title: 2016 Annual Technology Baseline (ATB) Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), National Renewable Energy Laboratory provides an organized and centralized dataset that was reviewed by internal and external experts. It uses the best information

  12. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    SciTech Connect (OSTI)

    Farren Hunt

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  13. Baseline Control Measures.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J....

  14. 241-AP Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Gunter, Jason R.; Reeploeg, Gretchen E.

    2014-04-04

    This report provides the results of an extent of condition construction history review for the 241-AP tank farm. The construction history of the 241-AP tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AP tank farm, the sixth double-shell tank farm constructed, tank bottom flatness, refractory material quality, post-weld stress relieving, and primary tank bottom weld rejection were improved.

  15. 241-AZ Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Boomer, Kayle D.; Gunter, Jason R.; Venetz, Theodore J.

    2013-07-30

    This report provides the results of an extent of condition construction history review for tanks 241-AZ-101 and 241-AZ-102. The construction history of the 241-AZ tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AZ tank farm, the second DST farm constructed, both refractory quality and tank and liner fabrication were improved.

  16. 241-SY Tank Farm Construction Extent of Condition Review for Tank Integrity

    SciTech Connect (OSTI)

    Barnes, Travis J.; Boomer, Kayle D.; Gunter, Jason R.; Venetz, Theodore J.

    2013-07-25

    This report provides the results of an extent of condition construction history review for tanks 241-SY-101, 241-SY-102, and 241-SY-103. The construction history of the 241-SY tank farm has been reviewed to identify issues similar to those experienced during tank 241-AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank 241-AY-102 as the comparison benchmark. In the 241-SY tank farm, the third DST farm constructed, refractory quality and stress relief were improved, while similar tank and liner fabrication issues remained.

  17. HEV America Baseline Test Sequence

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BASELINE TEST SEQUENCE Revision 1 September 1, 2006 Prepared by Electric Transportation Applications Prepared by: _______________________________ Date: __________ Roberta Brayer Approved by: _________ _________________________________ Date: _______________ _____ Donald B. Karner ©2005 Electric Transportation Applications All Rights Reserved HEV America Baseline Test Sequence Page 1 HEV PERFORMANCE TEST PROCEDURE SEQUENCE The following test sequence shall be used for conduct of HEV America

  18. Hanford Site technical baseline database

    SciTech Connect (OSTI)

    Porter, P.E., Westinghouse Hanford

    1996-05-10

    This document includes a cassette tape that contains the Hanford specific files that make up the Hanford Site Technical Baseline Database as of May 10, 1996. The cassette tape also includes the delta files that delineate the differences between this revision and revision 3 (April 10, 1996) of the Hanford Site Technical Baseline Database.

  19. Engineering task plan TWRS technical baseline completion

    SciTech Connect (OSTI)

    Moore, T.L

    1996-03-08

    The Tank Waste Remediation System (TWRS) includes many activities required to remediate the radioactive waste stored in underground waste storage tanks. These activities include routine monitoring of the waste, facilities maintenance, upgrades to existing equipment, and installation of new equipment necessary to manage, retrieve, process, and dispose of the waste. In order to ensure that these multiple activities are integrated, cost effective, and necessary, a sound technical baseline is required from which all activities can be traced and measured. The process by which this technical baseline is developed will consist of the identification of functions, requirements, architecture, and test (FRAT) methodology. This process must be completed for TWRS to a level that provides the technical basis for all facility/system/component maintenance, upgrades, or new equipment installation.

  20. A proposed outline and review schedule for an integrated FS-EIS

    SciTech Connect (OSTI)

    Ambrose, R.; Cunningham, M.; Hanrahan, T. )

    1993-01-01

    Both CERCLA and NEPA have specific requirements for the information content, format, and review schedule of their respective Feasibility Study (FS) and Environmental Impact Statement (EIS) documents. The FS serves as the mechanism for the development, screening, and detailed evaluation of alternative remedial actions, while the EIS provides a discussion of significant environmental impacts and presents alternatives which would avoid or minimize adverse impacts or enhance the quality of the human environment. In some cases, the CERCLA and NEPA processes have been expressed as functionally equivalent'', and the need for NEPA questioned in instances where CERCLA compliance is required. This argument has been presented on the grounds that the CERCLA process addresses the information content needs of NEPA. However, in cases where EIS documents are required, specific information needs that are called for under NEPA are not typically addressed or readily fitted into the FS format (e.g. socioeconomic impacts). In addition, review schedules for an FS and an EIS differ; public comment opportunities and length of comment period differ. Where certain Federal agencies require that CERCLA and NEPA be integrated, there is often the guidance that NEPA be fitted into the CERCLA process. Using this guidance, an outline has been developed which integrates the information content needs of an FS and EIS, while maintaining, as closely as possible, the integrity of the FS format.

  1. 324 Building Baseline Radiological Characterization

    SciTech Connect (OSTI)

    R.J. Reeder, J.C. Cooper

    2010-06-24

    This report documents the analysis of radiological data collected as part of the characterization study performed in 1998. The study was performed to create a baseline of the radiological conditions in the 324 Building.

  2. MHD Technology Transfer, Integration and Review Committee. Second semiannual status report, July 1988--March 1989

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    As part of the MHD Integrated Topping Cycle (ITC) project, TRW was given the responsibility to organize, charter and co-chair, with the Department of Energy (DOE), an MHD Technology Transfer, Integration and Review Committee (TTIRC). The Charter of the TTIRC, which was approved by the DOE in June 1988 and distributed to the committee members, is included as part of this Summary. As stated in the Charter, the purpose of this committee is to: (1) review all Proof-of-Concept (POC) projects and schedules in the national MHD program; to assess their compatibility with each other and the first commercial MHD retrofit plant; (2) establish and implement technology transfer formats for users of this technology; (3) identify interfaces, issues, and funding structures directly impacting the success of the commercial retrofit; (4) investigate and identify the manner in which, and by whom, the above should be resolved; and (5) investigate and assess other participation (foreign and domestic) in the US MHD Program. The DOE fiscal year 1989 MHD Program Plan Schedule is included at the end of this Summary. The MHD Technology Transfer, Integration and Review Committee`s activities to date have focused primarily on the ``technology transfer`` aspects of its charter. It has provided a forum for the dissemination of technical and programmatic information among workers in the field of MHD and to the potential end users, the utilities, by holding semi-annual meetings. The committee publishes this semi-annual report, which presents in Sections 2 through 11 capsule summaries of technical progress for all DOE Proof-of-Concept MHD contracts and major test facilities.

  3. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

  4. Development and Testing of an Integrated Sandia Cooler Thermoelectric Device (SCTD).

    SciTech Connect (OSTI)

    Johnson, Terry A.; Staats, Wayne Lawrence,; Leick, Michael Thomas; Zimmerman, Mark D.; Radermacher, Reinhard; Martin, Cara; Nasuta, Dennis; Kalinowski, Paul; Hoffman, William

    2014-12-01

    This report describes a FY14 effort to develop an integrated Sandia Cooler T hermoelectric D evice (SCTD) . The project included a review of feasible thermoelectric (TE) cooling applications, baseline performance testing of an existing TE device, analysis and design development of an integrated SCTD assembly, and performance measurement and validation of the integrated SCTD prototype.

  5. The Integrated Safety Management System Verification Enhancement Review of the Plutonium Finishing Plant (PFP)

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    2000-02-09

    The primary purpose of the verification enhancement review was for the DOE Richland Operations Office (RL) to verify contractor readiness for the independent DOE Integrated Safety Management System Verification (ISMSV) on the Plutonium Finishing Plant (PFP). Secondary objectives included: (1) to reinforce the engagement of management and to gauge management commitment and accountability; (2) to evaluate the ''value added'' benefit of direct public involvement; (3) to evaluate the ''value added'' benefit of direct worker involvement; (4) to evaluate the ''value added'' benefit of the panel-to-panel review approach; and, (5) to evaluate the utility of the review's methodology/adaptability to periodic assessments of ISM status. The review was conducted on December 6-8, 1999, and involved the conduct of two-hour interviews with five separate panels of individuals with various management and operations responsibilities related to PFP. A semi-structured interview process was employed by a team of five ''reviewers'' who directed open-ended questions to the panels which focused on: (1) evidence of management commitment, accountability, and involvement; and, (2) consideration and demonstration of stakeholder (including worker) information and involvement opportunities. The purpose of a panel-to-panel dialogue approach was to better spotlight: (1) areas of mutual reinforcement and alignment that could serve as good examples of the management commitment and accountability aspects of ISMS implementation, and, (2) areas of potential discrepancy that could provide opportunities for improvement. In summary, the Review Team found major strengths to include: (1) the use of multi-disciplinary project work teams to plan and do work; (2) the availability and broad usage of multiple tools to help with planning and integrating work; (3) senior management presence and accessibility; (4) the institutionalization of worker involvement; (5) encouragement of self-reporting and self

  6. Baseline Wind Energy Facility | Open Energy Information

    Open Energy Info (EERE)

    Wind Energy Facility Jump to: navigation, search Name Baseline Wind Energy Facility Facility Baseline Wind Energy Facility Sector Wind energy Facility Type Commercial Scale Wind...

  7. Review: Role of chemistry, mechanics, and transport on well integrity in CO2 storage environments

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Carroll, Susan; Carey, J. William; Dzombak, David; Huerta, Nicholas J.; Li, Li; Richard, Tom; Um, Wooyong; Walsh, Stuart D. C.; Zhang, Liwei

    2016-03-22

    Among the various risks associated with CO2 storage in deep geologic formations, wells are important potential pathways for fluid leaks and groundwater contamination. Injection of CO2 will perturb the storage reservoir and any wells that penetrate the CO2 or pressure footprints are potential pathways for leakage of CO2 and/or reservoir brine. Well leakage is of particular concern for regions with a long history of oil and gas exploration because they are top candidates for geologic CO2 storage sites. This review explores in detail the ability of wells to retain their integrity against leakage with careful examination of the coupled physicalmore » and chemical processes involved. Furthermore, understanding time-dependent leakage is complicated by the changes in fluid flow, solute transport, chemical reactions, and mechanical stresses over decade or longer time frames for site operations and monitoring.« less

  8. Vehicle Technologies Office Merit Review 2015: Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by National Renewable Energy Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

  9. Proceedings of the 24th Seismic Research Review: Nuclear Explosion Monitoring: Innovation and Integration

    SciTech Connect (OSTI)

    Warren, N. Jill

    2002-09-17

    These proceedings contain papers prepared for the 24th Seismic Research Review: Nuclear Explosion Monitoring: Innovation and Integration, held 17-19 September, 2002 in Ponte Vedra Beach, Florida. These papers represent the combined research related to ground-based nuclear explosion monitoring funded by the National Nuclear Security Administration (NNSA), Defense Threat Reduction Agency (DTRA), and other invited sponsors. The scientific objectives of the research are to improve the United States capability to detect, locate, and identify nuclear explosions. The purpose of the meeting is to provide the sponsoring agencies, as well as potential users, an opportunity to review research accomplished during the preceding year and to discuss areas of investigation for the coming year. For the researchers, it provides a forum for the exchange of scientific information toward achieving program goals, and an opportunity to discuss results and future plans. Paper topics include: seismic regionalization and calibration; detection and location of sources; wave propagation from source to receiver; the nature of seismic sources, including mining practices; hydroacoustic, infrasound, and radionuclide methods; on-site inspection; and data processing.

  10. Baseline Control Measures.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J. Intended for: Public Purpose: This poster was prepared for the June 2013 Individual Permit for Storm Water (IP) public meeting. The purpose of the meeting was to update the public on implementation of the permit as required under Part 1.I (7) of the IP (National Pollutant Discharge Elimination System Permit No.

  11. A Review of Barriers to and Opportunities for the Integration of Renewable Energy in the Southeast

    SciTech Connect (OSTI)

    McConnell, Ben W; Hadley, Stanton W; Xu, Yan

    2011-08-01

    The objectives of this study were to prepare a summary report that examines the opportunities for and obstacles to the integration of renewable energy resources in the Southeast between now and the year 2030. The report, which is based on a review of existing literature regarding renewable resources in the Southeast, includes the following renewable energy resources: wind, solar, hydro, geothermal, biomass, and tidal. The evaluation was conducted by the Oak Ridge National Laboratory for the Energy Foundation and is a subjective review with limited detailed analysis. However, the report offers a best estimate of the magnitude, time frame, and cost of deployment of renewable resources in the Southeast based upon the literature reviewed and reasonable engineering and economic estimates. For the purposes of this report, the Southeast is defined as the states of Alabama, Arkansas, Florida, Georgia, Kentucky, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, Virginia, and West Virginia. In addition, some aspects of the report (wind and geothermal) also consider the extended Southeast, which includes Maryland, Missouri, Oklahoma, and Texas. A description of the existing base of renewable electricity installations in the region is given for each technology considered. Where available, the possible barriers and other considerations regarding renewable energy resources are listed in terms of availability, investment and maintenance costs, reliability, installation requirements, policies, and energy market. As stated above, the report is a comprehensive review of renewable energy resources in the southeastern region of United States based on a literature study that included information obtained from the Southern Bio-Power wiki, sources from the Energy Foundation, sources available to ORNL, and sources found during the review. The report consists of an executive summary, this introductory chapter describing report objectives, a chapter on analysis methods and

  12. Baseline tests for arc melter vitrification of INEL buried wastes. Volume 1: Facility description and summary data report

    SciTech Connect (OSTI)

    Oden, L.L.; O`Connor, W.K.; Turner, P.C.; Soelberg, N.R.; Anderson, G.L.

    1993-11-19

    This report presents field results and raw data from the Buried Waste Integrated Demonstration (BWID) Arc Melter Vitrification Project Phase 1 baseline test series conducted by the Idaho National Engineering Laboratory (INEL) in cooperation with the U.S. Bureau of Mines (USBM). The baseline test series was conducted using the electric arc melter facility at the USBM Albany Research Center in Albany, Oregon. Five different surrogate waste feed mixtures were tested that simulated thermally-oxidized, buried, TRU-contaminated, mixed wastes and soils present at the INEL. The USBM Arc Furnace Integrated Waste Processing Test Facility includes a continuous feed system, the arc melting furnace, an offgas control system, and utilities. The melter is a sealed, 3-phase alternating current (ac) furnace approximately 2 m high and 1.3 m wide. The furnace has a capacity of 1 metric ton of steel and can process as much as 1,500 lb/h of soil-type waste materials. The surrogate feed materials included five mixtures designed to simulate incinerated TRU-contaminated buried waste materials mixed with INEL soil. Process samples, melter system operations data and offgas composition data were obtained during the baseline tests to evaluate the melter performance and meet test objectives. Samples and data gathered during this program included (a) automatically and manually logged melter systems operations data, (b) process samples of slag, metal and fume solids, and (c) offgas composition, temperature, velocity, flowrate, moisture content, particulate loading and metals content. This report consists of 2 volumes: Volume I summarizes the baseline test operations. It includes an executive summary, system and facility description, review of the surrogate waste mixtures, and a description of the baseline test activities, measurements, and sample collection. Volume II contains the raw test data and sample analyses from samples collected during the baseline tests.

  13. MHD Technology Transfer, Integration and Review Committee. Seventh semi-annual status report, April 1991--September 1991

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This seventh semi-annual status report of the MHD Technology Transfer, Integration and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1991 through September 1991. It includes a summary and minutes of the General Committee meeting, progress summaries of ongoing POC contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months. The meeting included test plan with Western coal, seed regeneration economics, power management for the integrated topping cycle and status of the Clean Coal Technology Proposal activities. Appendices cover CDIF operations HRSR development, CFFF operations etc.

  14. Baseline LAW Glass Formulation Testing

    SciTech Connect (OSTI)

    Kruger, Albert A.; Mooers, Cavin; Bazemore, Gina; Pegg, Ian L.; Hight, Kenneth; Lai, Shan Tao; Buechele, Andrew; Rielley, Elizabeth; Gan, Hao; Muller, Isabelle S.; Cecil, Richard

    2013-06-13

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  15. Global Nuclear Energy Partnership Waste Treatment Baseline

    SciTech Connect (OSTI)

    Dirk Gombert; William Ebert; James Marra; Robert Jubin; John Vienna

    2008-05-01

    The Global Nuclear Energy Partnership program (GNEP) is designed to demonstrate a proliferation-resistant and sustainable integrated nuclear fuel cycle that can be commercialized and used internationally. Alternative stabilization concepts for byproducts and waste streams generated by fuel recycling processes were evaluated and a baseline of waste forms was recommended for the safe disposition of waste streams. Waste forms are recommended based on the demonstrated or expected commercial practicability and technical maturity of the processes needed to make the waste forms, and performance of the waste form materials when disposed. Significant issues remain in developing technologies to process some of the wastes into the recommended waste forms, and a detailed analysis of technology readiness and availability may lead to the choice of a different waste form than what is recommended herein. Evolving regulations could also affect the selection of waste forms.

  16. Advanced Supervisory Control and Data Acquisition (SCADA) for Biochemical Process Integration Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supervisory Control and Data Acquisition (SCADA) for Biochemical Process Integration 2/26/2015 Biochemical Platform Review Jim Collett Pacific Northwest National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * The Challenge: Hydrocarbon biofuel production will require advanced supervisory control and data acquisition (SCADA) systems for bioconversion of highly variable biomass feedstocks with high levels of

  17. FED baseline engineering studies report

    SciTech Connect (OSTI)

    Sager, P.H.

    1983-04-01

    Studies were carried out on the FED Baseline to improve design definition, establish feasibility, and reduce cost. Emphasis was placed on cost reduction, but significant feasibility concerns existed in several areas, and better design definition was required to establish feasibility and provide a better basis for cost estimates. Design definition and feasibility studies included the development of a labyrinth shield ring concept to prevent radiation streaming between the torus spool and the TF coil cryostat. The labyrinth shield concept which was developed reduced radiation streaming sufficiently to permit contact maintenance of the inboard EF coils. Various concepts of preventing arcing between adjacent shield sectors were also explored. It was concluded that installation of copper straps with molybdenum thermal radiation shields would provide the most reliable means of preventing arcing. Other design studies included torus spool electrical/structural concepts, test module shielding, torus seismic response, poloidal conditions in the magnets, disruption characteristics, and eddy current effects. These additional studies had no significant impact on cost but did confirm the feasibility of the basic FED Baseline concept.

  18. TWRS privatization process technical baseline

    SciTech Connect (OSTI)

    Orme, R.M.

    1996-09-13

    The U.S. Department of Energy (DOE) is planning a two-phased program for the remediation of Hanford tank waste. Phase 1 is a pilot program to demonstrate the procurement of treatment services. The volume of waste treated during the Phase 1 is a small percentage of the tank waste. During Phase 2, DOE intends to procure treatment services for the balance of the waste. The TWRS Privatization Process Technical Baseline (PPTB) provides a summary level flowsheet/mass balance of tank waste treatment operations which is consistent with the tank inventory information, waste feed staging studies, and privatization guidelines currently available. The PPTB will be revised periodically as privatized processing concepts are crystallized.

  19. Baseline Graphite Characterization: First Billet

    SciTech Connect (OSTI)

    Mark C. Carroll; Joe Lords; David Rohrbaugh

    2010-09-01

    The Next Generation Nuclear Plant Project Graphite Research and Development program is currently establishing the safe operating envelope of graphite core components for a very high temperature reactor design. To meet this goal, the program is generating the extensive amount of quantitative data necessary for predicting the behavior and operating performance of the available nuclear graphite grades. In order determine the in-service behavior of the graphite for the latest proposed designs, two main programs are underway. The first, the Advanced Graphite Creep (AGC) program, is a set of experiments that are designed to evaluate the irradiated properties and behavior of nuclear grade graphite over a large spectrum of temperatures, neutron fluences, and compressive loads. Despite the aggressive experimental matrix that comprises the set of AGC test runs, a limited amount of data can be generated based upon the availability of space within the Advanced Test Reactor and the geometric constraints placed on the AGC specimens that will be inserted. In order to supplement the AGC data set, the Baseline Graphite Characterization program will endeavor to provide supplemental data that will characterize the inherent property variability in nuclear-grade graphite without the testing constraints of the AGC program. This variability in properties is a natural artifact of graphite due to the geologic raw materials that are utilized in its production. This variability will be quantified not only within a single billet of as-produced graphite, but also from billets within a single lot, billets from different lots of the same grade, and across different billets of the numerous grades of nuclear graphite that are presently available. The thorough understanding of this variability will provide added detail to the irradiated property data, and provide a more thorough understanding of the behavior of graphite that will be used in reactor design and licensing. This report covers the

  20. Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012

    Office of Environmental Management (EM)

    Contractor Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background

  1. Emergency Response Capability Baseline Needs Assessment Compliance Assessment

    SciTech Connect (OSTI)

    Sharry, John A.

    2013-09-16

    This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2013 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2009 BNA, the 2012 BNA document, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures.

  2. Multiproject baselines for evaluation of electric power projects

    SciTech Connect (OSTI)

    Sathaye, Jayant; Murtishaw, Scott; Price, Lynn; Lefranc, Maurice; Roy, Joyashree; Winkler, Harald; Spalding-Fecher, Randall

    2003-03-12

    Calculating greenhouse gas emissions reductions from climate change mitigation projects requires construction of a baseline that sets emissions levels that would have occurred without the project. This paper describes a standardized multiproject methodology for setting baselines, represented by the emissions rate (kg C/kWh), for electric power projects. A standardized methodology would reduce the transaction costs of projects. The most challenging aspect of setting multiproject emissions rates is determining the vintage and types of plants to include in the baseline and the stringency of the emissions rates to be considered, in order to balance the desire to encourage no- or low-carbon projects while maintaining environmental integrity. The criteria for selecting power plants to include in the baseline depend on characteristics of both the project and the electricity grid it serves. Two case studies illustrate the application of these concepts to the electric power grids in eastern India and South Africa. We use hypothetical, but realistic, climate change projects in each country to illustrate the use of the multiproject methodology, and note the further research required to fully understand the implications of the various choices in constructing and using these baselines.

  3. The mixed waste management facility. Project baseline revision 1.2

    SciTech Connect (OSTI)

    Streit, R.D.; Throop, A.L.

    1995-04-01

    Revision 1.2 to the Project Baseline (PB) for the Mixed Waste Management Facility (MWMF) is in response to DOE directives and verbal guidance to (1) Collocate the Decontamination and Waste Treatment Facility (DWTF) and MWMF into a single complex, integrate certain and overlapping functions as a cost-saving measure; (2) Meet certain fiscal year (FY) new-BA funding objectives ($15.3M in FY95) with lower and roughly balanced funding for out years; (3) Reduce Total Project Cost (TPC) for the MWMF Project; (4) Include costs for all appropriate permitting activities in the project TPC. This baseline revision also incorporates revisions in the technical baseline design for Molten Salt Oxidation (MSO) and Mediated Electrochemical Oxidation (MEO). Changes in the WBS dictionary that are necessary as a result of this rebaseline, as well as minor title changes, at WBS Level 3 or above (DOE control level) are approved as a separate document. For completeness, the WBS dictionary that reflects these changes is contained in Appendix B. The PB, with revisions as described in this document, were also the basis for the FY97 Validation Process, presented to DOE and their reviewers on March 21-22, 1995. Appendix C lists information related to prior revisions to the PB. Several key changes relate to the integration of functions and sharing of facilities between the portion of the DWTF that will house the MWMF and those portions that are used by the Hazardous Waste Management (HWM) Division at LLNL. This collocation has been directed by DOE as a cost-saving measure and has been implemented in a manner that maintains separate operational elements from a safety and permitting viewpoint. Appendix D provides background information on the decision and implications of collocating the two facilities.

  4. Review: Role of chemistry, mechanics, and transport on well integrity in CO2 storage environments

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Carroll, Susan A.; Carey, William J.; Dzombak, David; Huerta, Nicolas J.; Li, Li; Richard, Tom; Um, Wooyong; Walsh, Stuart D. C.; Zhang, Liwei

    2016-03-22

    Among the various risks associated with CO2 storage in deep geologic formations, wells are important potential pathways for fluid leaks and groundwater contamination. Injection of CO2 will perturb the storage reservoir and any wells that penetrate the CO2 or pressure footprints are potential pathways for leakage of CO2 and/or reservoir brine. Well leakage is of particular concern for regions with a long history of oil and gas exploration because they are top candidates for geologic CO2storage sites. This review explores in detail the ability of wells to retain their integrity against leakage with careful examination of the coupled physical andmore » chemical processes involved. Understanding time-dependent leakage is complicated by the changes in fluid flow, solute transport, chemical reactions, and mechanical stresses over decade or longer time frames for site operations and monitoring. Almost all studies of the potential for well leakage have been laboratory based, as there are limited data on field-scale leakage. When leakage occurs by diffusion only, laboratory experiments show that while CO2 and CO2-saturated brine react with cement and casing, the rate of degradation is transport-limited and alteration of cement and casing properties is low. When a leakage path is already present due to cement shrinkage or fracturing, gaps along interfaces (e.g. casing/cement or cement/rock), or casing failures, chemical and mechanical alteration have the potential to decrease or increase leakage risks. Laboratory experiments and numerical simulations have shown that mineral precipitation or closure of strain-induced fractures can seal a leak pathway over time or conversely open pathways depending on flow-rate, chemistry, and the stress state. Experiments with steel/cement and cement/rock interfaces have indicated that protective mechanisms such as metal passivation, chemical alteration, mechanical deformation, and pore clogging can also help mitigate leakage. The specific

  5. Vehicle Technologies Office Merit Review 2016: Modeling & Controls Software Tools to Support V2G Integration

    Broader source: Energy.gov [DOE]

    Presentation given by Lawrence Berkeley National Laboratory (LBNL) at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting...

  6. Vehicle Technologies Office Merit Review 2015: Applied Integrated Computational Materials Engineering (ICME) for New Propulsion Materials

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Applied...

  7. Vehicle Technologies Office Merit Review 2016: Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

    Broader source: Energy.gov [DOE]

    Presentation given by Eaton at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Vehicle Systems

  8. Vehicle Technologies Office Merit Review 2016: VTO Vehicle to Building Integration Pathway

    Broader source: Energy.gov [DOE]

    Presentation given by Pacific Northwest National Laboratory (PNNL) at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting...

  9. Arc melter demonstration baseline test results

    SciTech Connect (OSTI)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; Oden, L.L.; O`Connor, W.K.; Turner, P.C.

    1994-07-01

    This report describes the test results and evaluation for the Phase 1 (baseline) arc melter vitrification test series conducted for the Buried Waste Integrated Demonstration program (BWID). Phase 1 tests were conducted on surrogate mixtures of as-incinerated wastes and soil. Some buried wastes, soils, and stored wastes at the INEL and other DOE sites, are contaminated with transuranic (TRU) radionuclides and hazardous organics and metals. The high temperature environment in an electric arc furnace may be used to process these wastes to produce materials suitable for final disposal. An electric arc furnace system can treat heterogeneous wastes and contaminated soils by (a) dissolving and retaining TRU elements and selected toxic metals as oxides in the slag phase, (b) destroying organic materials by dissociation, pyrolyzation, and combustion, and (c) capturing separated volatilized metals in the offgas system for further treatment. Structural metals in the waste may be melted and tapped separately for recycle or disposal, or these metals may be oxidized and dissolved into the slag. The molten slag, after cooling, will provide a glass/ceramic final waste form that is homogeneous, highly nonleachable, and extremely durable. These features make this waste form suitable for immobilization of TRU radionuclides and toxic metals for geologic timeframes. Further, the volume of contaminated wastes and soils will be substantially reduced in the process.

  10. Tank waste remediation systems technical baseline database

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-16

    This document includes a cassette tape that contains Hanford generated data for the Tank Waste Remediation Systems Technical Baseline Database as of October 09, 1996.

  11. Baselines for Greenhouse Gas Reductions: Problems, Precedents...

    Open Energy Info (EERE)

    Baseline projection, GHG inventory, Pathways analysis Resource Type: Publications, Lessons learnedbest practices Website: www.p2pays.orgref2221739.pdf References:...

  12. A review of OSHA PSM citations relating to mechanical integrity of process piping

    SciTech Connect (OSTI)

    Casada, M.L.; Remson, A.C.; Yerger, C.M. [JBF Associates, Inc., Knoxville, TN (United States)

    1996-07-01

    OSHA`s process safety management (PSM) regulation has been in effect for more than three years. The regulation poses challenges for facilities in documenting the integrity of process piping systems. This paper summarizes the results of a project sponsored by the Materials Technology Institute (MTI) to compile PSM enforcement information relating to mechanical integrity W and process safety information (PSI) relating to equipment. This paper provides an analysis of how OSHA is citing violations of the PSM regulation as it relates to process piping. This information should be helpful to engineers and maintenance personnel who need guidance on how to ``OSHA-proof`` their mechanical integrity compliance for process piping systems.

  13. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    SciTech Connect (OSTI)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  14. Spent nuclear fuel technical baseline description, Fiscal Year 1996: Volume II, supporting data

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-11-01

    The Technical Baseline Description documents the Project-Level functions and requirements, along with associated enabling assumptions, issues, trade studies, interfaces, and products. It is a snapshot in time of the baseline at the beginning of September 1995. It supports the individual subprojects in the development of lower-tier functions, requirements, and specifications in FY 1996. It also supports the need for Hanford site planning to be based on an integrated Hanford site systems engineering technical baseline; and is traceable to that baseline. This document replaces and supercedes WHC-SD-SNF-SD-003.

  15. Handbook Issued on NEPA and CEQA: Integrating Federal and State Environmental Reviews

    Broader source: Energy.gov [DOE]

    The Council on Environmental Quality (CEQ) and the California Governor's Office of Planning and Research (OPR) jointly issued a new handbook, NEPA and CEQA: Integrating Federal and State...

  16. Pilot Scale Integration Project Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Scale Integration Project March 25, 2015 Biochemical Conversion Area Daniel Schell NREL This presentation does not contain any proprietary, confidential or otherwise restricted information 2 High-Level Project Goal Support BETO's and the Biochemical Conversion Technology Area's mission to deploy cost-effective biofuels production technology. * Maintains pilot scale facility that is available for BETO and industry use * Generates process-relevant integrated performance data * Facilitates

  17. ARM: Baseline Solar Radiation Network (BSRN): solar irradiances...

    Office of Scientific and Technical Information (OSTI)

    Baseline Solar Radiation Network (BSRN): solar irradiances Title: ARM: Baseline Solar Radiation Network (BSRN): solar irradiances Baseline Solar Radiation Network (BSRN): solar ...

  18. Long-Baseline Neutrino Facility / Deep Underground Neutrino Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Baseline Neutrino Facility Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline Neutrino Facility Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline ...

  19. Vehicle Technologies Office Merit Review 2015: Overview of VTO Technology Integration Activities

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by U.S. Department of Energy at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about overview of VTO...

  20. Vehicle Technologies Office Merit Review 2015: Traction Drive Systems with Integrated Wireless Charging

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by Oak Ridge National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about traction drive...

  1. Vehicle Technologies Office Merit Review 2016: VTO Diagnostic Security Modules for Electric Vehicle to Building Integration

    Broader source: Energy.gov [DOE]

    Presentation given by Idaho National Laboratory (INL) at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Vehicle...

  2. Renewable Diesel from Algal Lipis: An Integrated Baseline for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    commercial product, process, or ... with model-based quantitative metrics for cost, scale-up potential, and sustainability. ... on regulatory policy restrictions, the ...

  3. Wind energy and power system operations: a review of wind integration studies to date

    SciTech Connect (OSTI)

    Cesaro, Jennifer de; Porter, Kevin; Milligan, Michael

    2009-12-15

    Wind integration will not be accomplished successfully by doing ''more of the same.'' It will require significant changes in grid planning and operations, continued technical evolution in the design and operation of wind turbines, further adoption and implementation of wind forecasting in the control room, and incorporation of market and policy initiatives to encourage more flexible generation. (author)

  4. TWRS technical baseline database manager definition document

    SciTech Connect (OSTI)

    Acree, C.D.

    1997-08-13

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.

  5. Revised SRC-I project baseline. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    International Coal Refining Company (ICRC), in cooperation with the Commonwealth of Kentucky has contracted with the United States Department of Energy (DOE) to design, build and operate a first-of-its-kind plant demonstrating the economic, environmental, socioeconomic and technical feasibility of the direct coal liquefaction process known as SRC-I. ICRC has made a massive commitment of time and expertise to design processes, plan and formulate policy, schedules, costs and technical drawings for all plant systems. These fully integrated plans comprise the Project Baseline and are the basis for all future detailed engineering, plant construction, operation, and other work set forth in the contract between ICRC and the DOE. Volumes I and II of the accompanying documents constitute the updated Project Baseline for the SRC-I two-stage liquefaction plant. International Coal Refining Company believes this versatile plant design incorporates the most advanced coal liquefaction system available in the synthetic fuels field. SRC-I two-stage liquefaction, as developed by ICRC, is the way of the future in coal liquefaction because of its product slate flexibility, high process thermal efficiency, and low consumption of hydrogen. The SRC-I Project Baseline design also has made important state-of-the-art advances in areas such as environmental control systems. Because of a lack of funding, the DOE has curtailed the total project effort without specifying a definite renewal date. This precludes the development of revised accurate and meaningful schedules and, hence, escalated project costs. ICRC has revised and updated the original Design Baseline to include in the technical documentation all of the approved but previously non-incorporated Category B and C and new Post-Baseline Engineering Change Proposals.

  6. Hanford Site technical baseline database. Revision 1

    SciTech Connect (OSTI)

    Porter, P.E.

    1995-01-27

    This report lists the Hanford specific files (Table 1) that make up the Hanford Site Technical Baseline Database. Table 2 includes the delta files that delineate the differences between this revision and revision 0 of the Hanford Site Technical Baseline Database. This information is being managed and maintained on the Hanford RDD-100 System, which uses the capabilities of RDD-100, a systems engineering software system of Ascent Logic Corporation (ALC). This revision of the Hanford Site Technical Baseline Database uses RDD-100 version 3.0.2.2 (see Table 3). Directories reflect those controlled by the Hanford RDD-100 System Administrator. Table 4 provides information regarding the platform. A cassette tape containing the Hanford Site Technical Baseline Database is available.

  7. Verification of warhead dismantelment and the importance of baseline validation

    SciTech Connect (OSTI)

    Buonpane, L.M.; Strait, R.S. )

    1991-01-01

    This paper presents an approach for evaluating verification regimes for nuclear warhead dismantlement. The approach is an adaptation of the traditional nuclear materials management model. As such the approach integrates the difficulties of verifying both stockpile estimates and numbers of warheads dismantled. Both random uncertainties and systematic uncertainties are considered in this approach. By making some basic assumptions about the relative uncertainties surrounding the stockpile estimates and the numbers of warheads dismantled, the authors illustrate their relative impacts on overall verification ability. The results highlight the need for increased attention on the problem of validating baseline declarations of stockpile size.

  8. Summative Mass Closure: Laboratory Analytical Procedure (LAP) Review and Integration: Feedstocks; Issue Date: April 2010; Revision Date: July 2011 (Version 07-08-2011)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summative Mass Closure Laboratory Analytical Procedure (LAP) Review and Integration Issue Date: April 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A. Sluiter Technical Report NREL/TP-510-48087 Revised July 2011 Technical Report Summative Mass Closure NREL/TP-510-48087 Revised July 2011 Laboratory Analytical Procedure (LAP) Review and Integration Issue Date: April 2010 Revision Date: July 2011 (Version 07-08-2011) J. Sluiter and A. Sluiter Prepared under Task No. BB072230

  9. Solid Waste Program technical baseline description

    SciTech Connect (OSTI)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  10. Waste management project technical baseline description

    SciTech Connect (OSTI)

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  11. Indonesia-Danish Government Baseline Workstream | Open Energy...

    Open Energy Info (EERE)

    Indonesia-Danish Government Baseline Workstream Jump to: navigation, search Name Indonesia-Danish Government Baseline Workstream AgencyCompany Organization Danish Government...

  12. China-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name China-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  13. UNFCCC-Consolidated baseline and monitoring methodology for landfill...

    Open Energy Info (EERE)

    Consolidated baseline and monitoring methodology for landfill gas project activities Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNFCCC-Consolidated baseline and...

  14. India-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name India-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  15. Baseline and Target Values for PV Forecasts: Toward Improved...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting ... Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting Jie ...

  16. EA-1943: Construction and Operation of the Long Baseline Neutrino...

    Energy Savers [EERE]

    43: Construction and Operation of the Long Baseline Neutrino Facility and Deep Underground ... EA-1943: Construction and Operation of the Long Baseline Neutrino Facility and Deep ...

  17. South Africa-Danish Government Baseline Workstream | Open Energy...

    Open Energy Info (EERE)

    Baseline Workstream Jump to: navigation, search Name South Africa-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish Ministry for...

  18. NREL: Energy Analysis - Annual Technology Baseline and Standard...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Technology Baseline and Standard Scenarios - Legacy Versions This section contains earlier versions of NREL's Annual Technology Baseline and Standard Scenarios products. ...

  19. Brazil-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name Brazil-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  20. Mexico-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Danish Government Baseline Workstream Jump to: navigation, search Name Mexico-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  1. Baseline Microstructural Characterization of Outer 3013 Containers

    SciTech Connect (OSTI)

    Zapp, Phillip E.; Dunn, Kerry A

    2005-07-31

    Three DOE Standard 3013 outer storage containers were examined to characterize the microstructure of the type 316L stainless steel material of construction. Two of the containers were closure-welded yielding production-quality outer 3013 containers; the third examined container was not closed. Optical metallography and Knoop microhardness measurements were performed to establish a baseline characterization that will support future destructive examinations of 3013 outer containers in the storage inventory. Metallography revealed the microstructural features typical of this austenitic stainless steel as it is formed and welded. The grains were equiaxed with evident annealing twins. Flow lines were prominent in the forming directions of the cylindrical body and flat lids and bottom caps. No adverse indications were seen. Microhardness values, although widely varying, were consistent with annealed austenitic stainless steel. The data gathered as part of this characterization will be used as a baseline for the destructive examination of 3013 containers removed from the storage inventory.

  2. The Fermilab long-baseline neutrino program

    SciTech Connect (OSTI)

    Goodman, M.; MINOS Collaboration

    1997-10-01

    Fermilab is embarking upon a neutrino oscillation program which includes a long-baseline neutrino experiment MINOS. MINOS will be a 10 kiloton detector located 730 km Northwest of Fermilab in the Soudan underground laboratory. It will be sensitive to neutrino oscillations with parameters above {Delta}m{sup 2} {approximately} 3 {times} 10{sup {minus}3} eV{sup 2} and sin{sup 2}(2{theta}) {approximately} 0.02.

  3. Systematic errors in long baseline oscillation experiments

    SciTech Connect (OSTI)

    Harris, Deborah A.; /Fermilab

    2006-02-01

    This article gives a brief overview of long baseline neutrino experiments and their goals, and then describes the different kinds of systematic errors that are encountered in these experiments. Particular attention is paid to the uncertainties that come about because of imperfect knowledge of neutrino cross sections and more generally how neutrinos interact in nuclei. Near detectors are planned for most of these experiments, and the extent to which certain uncertainties can be reduced by the presence of near detectors is also discussed.

  4. Electrochemistry Diagnostics of Baseline and New Materials

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  5. Electrochemistry Diagnostics of Baseline and New Materials

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  6. Electrochemistry Diagnostics of Baseline and New Materials

    Broader source: Energy.gov [DOE]

    2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

  7. National Nuclear Security Administration Service Center Environmental Programs Long-Term Environmental Stewardship Baseline Handbook

    SciTech Connect (OSTI)

    Griswold, D. D.; Rohde, K.

    2003-02-26

    As environmental restoration (ER) projects move toward completion, the planning, integration, and documentation of long-term environmental stewardship (LTES) activities is increasingly important for ensuring smooth transition to LTES. The Long-Term Environmental Stewardship Baseline Handbook (Handbook) prepared by the National Nuclear Security Administration (NNSA) Service Center Environmental Programs Department (EPD) outlines approaches for integrating site-specific LTES planning and implementation into site ER baseline documentation. Since LTES will vary greatly from site to site, the Handbook also provides for flexibility in addressing LTES in ER Project life-cycle baselines, while clearly identifying Environmental Management (EM) requirements. It provides suggestions for enacting LTES principles and objectives through operational activities described in site-specific LTES plans and life cycle ER Project baseline scope, cost, and schedule documentation and tools for more thorough planning, better quantification, broader understanding of risk and risk management factors, and more comprehensive documentation. LTES planning applied to baselines in a phased approach will facilitate seamlessly integrating LTES into site operational activities, thereby minimizing the use of resources.

  8. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, July--September 1993

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model. During the period of this report, a Topical Report summarizing the Baseline Case design was drafted and issued to DOE/PETC for review and release approval. Major effort was spent on the Alternate Upgrading and Refining Case. Its design specifications were finalized, and material and utility balances completed. Initial capital cost estimates were developed. A Topical Report, summarizing the Alternative (ZSM-5) Upgrading and Refining Case design, is being drafted. Under Task 4, some of the individual plant models were expanded and enhanced. An overall ASPEN/SP process simulation model was developed for the Baseline Design Case by combining the individual models of Areas 100, 200 and 300. In addition, a separate model for the simplified product refining area, Area 300, of the Alternate Upgrading and Refining case was developed. Under Task 7, cost and schedule control was the primary activity. A technical paper entitled ``Baseline Design/Economics for Advanced Fischer-Tropsch Technology`` was presented in the DOE/PETC`s Annual Contractors Review Conference, held at Pittsburgh, Pennsylvania, on September 27-29, 1993. A contract amendment was submitted to include the Kerr McGee ROSE unit in the Baseline design case and to convert the PFS models from the ASPEN/SP to ASPEN/Plus software code.

  9. Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Blair, Nate; Cory, Karlynn; Hand, Maureen; Parkhill, Linda; Speer, Bethany; Stehly, Tyler; Feldman, David; Lantz, Eric; Augusting, Chad; Turchi, Craig; O'Connor, Patrick

    2015-07-08

    Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), National Renewable Energy Laboratory provides an organized and centralized dataset that was reviewed by internal and external experts. It uses the best information from the Department of Energy laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values using best available information. The ATB includes both a presentation with notes (PDF) and an associated Excel Workbook. The ATB includes the following electricity generation technologies: land-based wind; offshore wind; utility-scale solar PV; concentrating solar power; geothermal power; hydropower plants (upgrades to existing facilities, powering non-powered dams, and new stream-reach development); conventional coal; coal with carbon capture and sequestration; integrated gasification combined cycle coal; natural gas combustion turbines; natural gas combined cycle; conventional biopower. Nuclear laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values using best available information.

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Title: Algae Resource Assessment May 20, 2013 Technology Area Review: Analysis & Sustainability Principal Investigator: Mark Wigmosta Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement BETO launched an initiative to obtain consistent quantitative metrics for algal biofuel production in order to establish an "integrated baseline" production scenario

  11. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    SciTech Connect (OSTI)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-02-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

  12. Grocery 2009 TSD Miami Baseline | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Model Name Grocery 2009 TSD Miami Baseline Building Type Food Sales Model Type Baseline Model Target Type ASHRAE 90.1 2004 Model Year 2009 IDF file...

  13. Grocery 2009 TSD Chicago Baseline | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Model Name Grocery 2009 TSD Chicago Baseline Building Type Food Sales Model Type Baseline Model Target Type ASHRAE 90.1 2004 Model Year 2009 IDF file...

  14. Proposed Methodology for LEED Baseline Refrigeration Modeling (Presentation)

    SciTech Connect (OSTI)

    Deru, M.

    2011-02-01

    This PowerPoint presentation summarizes a proposed methodology for LEED baseline refrigeration modeling. The presentation discusses why refrigeration modeling is important, the inputs of energy models, resources, reference building model cases, baseline model highlights, example savings calculations and results.

  15. Energy Intensity Baselining and Tracking Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » Better Plants » Energy Intensity Baselining and Tracking Guidance Energy Intensity Baselining and Tracking Guidance The Energy Intensity Baselining and Tracking Guidance for the Better Buildings, Better Plants Program helps companies meet the program's reporting requirements by describing the steps necessary to develop an energy consumption and energy intensity baseline and calculating consumption and intensity changes over time. Most of the calculation steps described

  16. Vehicle Technologies Office Merit Review 2014: Integrated Vehicle Thermal Management – Combining Fluid Loops in Electric Drive Vehicles

    Broader source: Energy.gov [DOE]

    Presentation given by National Renewable Energy Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

  17. Vehicle Technologies Office Merit Review 2016: Integrated Computational Materials Engineering (ICME) Development of Carbon Fiber Composites for Lightweight Vehicles

    Broader source: Energy.gov [DOE]

    Presentation given by Ford at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Lightweighting

  18. Vehicle Technologies Office Merit Review 2016: An Integrated Flame Spray Process for Low Cost Production of Battery Materials

    Broader source: Energy.gov [DOE]

    Presentation given by University of Missouri at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Batteries

  19. Vehicle Technologies Office Merit Review 2016: Integrated Computational Materials Engineering Approach to Development of Lightweight 3GAHSS Vehicle Assembly

    Broader source: Energy.gov [DOE]

    Presentation given by USAMP at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Lightweighting

  20. Vehicle Technologies Office Merit Review 2016: Integrated Friction Reduction Technology to Improve Fuel Economy without Sacrificing Durability

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by George Washington University at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Fuel &...

  1. A SURVEY OF ASTRONOMICAL RESEARCH: A BASELINE FOR ASTRONOMICAL DEVELOPMENT

    SciTech Connect (OSTI)

    Ribeiro, V. A. R. M.; Russo, P.; Crdenas-Avendao, A. E-mail: russo@strw.leidenuniv.nl

    2013-12-01

    Measuring scientific development is a difficult task. Different metrics have been put forward to evaluate scientific development; in this paper we explore a metric that uses the number of peer-reviewed, and when available non-peer-reviewed, research articles as an indicator of development in the field of astronomy. We analyzed the available publication record, using the Smithsonian Astrophysical Observatory/NASA Astrophysics Database System, by country affiliation in the time span between 1950 and 2011 for countries with a gross national income of less than 14,365 USD in 2010. This represents 149 countries. We propose that this metric identifies countries in ''astronomical development'' with a culture of research publishing. We also propose that for a country to develop in astronomy, it should invest in outside expert visits, send its staff abroad to study, and establish a culture of scientific publishing. Furthermore, we propose that this paper may be used as a baseline to measure the success of major international projects, such as the International Year of Astronomy 2009.

  2. LTC vacuum blasting machine (concrete): Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The LTC shot blast technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC 1073 Vacuum Blasting Machine uses a high-capacity, direct-pressure blasting system which incorporates a continuous feed for the blast media. The blast media cleans the surface within the contained brush area of the blast. It incorporates a vacuum system which removes dust and debris from the surface as it is blasted. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure during maintenance activities was minimal, but due to mechanical difficulties dust monitoring could not be conducted during operation. Noise exposure was significant. Further testing for each of these exposures is recommended because of the outdoor environment where the testing demonstration took place. This may cause the results to be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed environment. In addition, other safety and health issues found were ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, and arm-hand vibration.

  3. LTC vacuum blasting machine (metal): Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  4. Pentek metal coating removal system: Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  5. Baseline air quality study at Fermilab

    SciTech Connect (OSTI)

    Dave, M.J.; Charboneau, R.

    1980-10-01

    Air quality and meteorological data collected at Fermi National Accelerator Laboratory are presented. The data represent baseline values for the pre-construction phase of a proposed coal-gasification test facility. Air quality data were characterized through continuous monitoring of gaseous pollutants, collection of meteorological data, data acquisition and reduction, and collection and analysis of discrete atmospheric samples. Seven air quality parameters were monitored and recorded on a continuous real-time basis: sulfur dioxide, ozone, total hydrocarbons, nonreactive hydrocarbons, nitric oxide, nitrogen oxides, and carbon monoxide. A 20.9-m tower was erected near Argonne's mobile air monitoring laboratory, which was located immediately downwind of the proposed facility. The tower was instrumented at three levels to collect continuous meteorological data. Wind speed was monitored at three levels; wind direction, horizontal and vertical, at the top level; ambient temperature at the top level; and differential temperature between all three levels. All continuously-monitored parameters were digitized and recorded on magnetic tape. Appropriate software was prepared to reduce the data. Statistical summaries, grphical displays, and correlation studies also are presented.

  6. Land Use Baseline Report Savannah River Site

    SciTech Connect (OSTI)

    Noah, J.C.

    1995-06-29

    This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

  7. Residential Buildings Integration Program Overview - 2015 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integration Program Overview - 2014 BTO Peer Review Residential Buildings Integration Program Overview - 2016 BTO Peer Review NREL: Building America Total Quality Management - 2015

  8. Commercial Buildings Integration Program Overview - 2013 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 BTO Peer Review Commercial Buildings Integration Program Overview - 2013 BTO Peer Review Commercial Buildings Integration Program Presentation for the 2013 Building Technologies ...

  9. CBEI: Collaborative Approaches for Integrated Energy Retrofits...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer Review CBEI: Collaborative Approaches for Integrated Energy Retrofits - 2015 Peer Review Presenter: John ...

  10. Commercial Buildings Integration Program Overview - 2016 BTO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Integration Program Overview - 2016 BTO Peer Review Commercial Buildings Integration Program Overview - 2016 BTO Peer Review Presenter: Jason Hartke, U.S. Department of ...

  11. NREL: Climate Neutral Research Campuses - Determine Baseline Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Consumption Determine Baseline Energy Consumption To create a climate action plan for your research campus, begin by determining current energy consumption and the resulting greenhouse gas emissions. You can then break down emissions by sector. It important to understand the following at the beginning: The Importance of a Baseline "The baseline inventory also provides a common data set for establishing benchmarks and priorities during the strategic planning stage and a means for

  12. Mid-Atlantic Baseline Studies Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mid-Atlantic Baseline Studies Project Mid-Atlantic Baseline Studies Project Funded by the Department of Energy, along with a number of partners, the collaborative Mid-Atlantic Baseline Studies Project, led by the Biodiversity Research Institute (BRI), helps improve understanding of species composition and use of the Mid-Atlantic marine environment in order to promote more sustainable offshore wind development. This first-of-its-kind study along the Eastern Seaboard of the United States delivers

  13. Long-Baseline Neutrino Facility / Deep Underground Neutrino Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (LBNF-DUNE) | Department of Energy Long-Baseline Neutrino Facility / Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline Neutrino Facility / Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline Neutrino Facility / Deep Underground Neutrino Project (LBNF-DUNE) Chris Mossey, Deputy Lab Director (Fermi) and Project Director for LBNF-DUNE March 23, 2016 Presentation (5.94 MB) Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents

  14. ATIC as a testbed for the ACCESS baseline calorimeter

    SciTech Connect (OSTI)

    Isbert, J.; Authement, J.; Coleman, J.; Guzik, T. G.; Granger, D.; Lockwood, R.; McMorris, A.; Mock, L.; Oubre, C.; Panasyuk, M.; Peck, J.; Wefel, J. P.; Adams, J. H. Jr.; Boberg, P. R.; Dion-Schwarz, C.; Kroeger, R.; Bashindzhagyan, G. B.; Khein, L.; Samsonov, G. A.; Zatsepin, V. I.

    1999-01-22

    The Advanced Thin Ionization Calorimeter (ATIC) balloon experiment is designed to measure the spectrum of individual elements from H through Fe up to a total energy >10{sup 14} eV. To accomplish this goal, ATIC incorporates a Silicon matrix detector composed of more than 4,000 pixels to measure the incident particle charge in the presence of backscatter background, three plastic scintillator hodoscopes to provide an event trigger as well as a backup measurement of the particle charge and trajectory, a 3/4 interaction length carbon target and a fully active ionization calorimeter composed of 22 radiation lengths of Bismuth Germanate (BGO) crystals. This detector complement is very similar to the baseline calorimeter for the Advanced Cosmic Ray Composition Experiment for the Space Station, ACCESS. The ATIC flights can be used to evaluate such a calorimeter in the cosmic ray 'beam.' ATIC integration is currently underway with a first flight expected during 1999. This talk will discuss ATIC as it applies to ACCESS.

  15. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    SciTech Connect (OSTI)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-03-13

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also.

  16. Cost and Performance Comparison Baseline for Fossil Energy Power...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    blocks together into a new, revolutionary concept for future coal-based power and energy production. Objective To establish baseline performance and cost estimates for today's...

  17. Updates to the International Linear Collider Damping Rings Baseline...

    Office of Scientific and Technical Information (OSTI)

    Updates to the International Linear Collider Damping Rings Baseline Design Citation Details In-Document Search Title: Updates to the International Linear Collider Damping Rings...

  18. Sandia Energy - Scaled Wind Farm Technology Facility Baselining...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accelerates Work Home Renewable Energy Energy SWIFT Facilities Partnership News Wind Energy News & Events Systems Analysis Scaled Wind Farm Technology Facility Baselining...

  19. South Africa - Greenhouse Gas Emission Baselines and Reduction...

    Open Energy Info (EERE)

    from Buildings AgencyCompany Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis,...

  20. Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials...

    Open Energy Info (EERE)

    from Buildings AgencyCompany Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis,...

  1. U.S. Department of Energy Performance Baseline Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    The guide supports DOE O 413.3A and identifies key performance baseline development processes and practices. Does not cancel other directives.

  2. ENERGY STAR PortfolioManager Baseline Year Instructions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Baseline Year" Time frame Select "Multiple Properties" Using filters, choose properties to include in report Check box to Select all filtered properties Select these reporting ...

  3. EA-1943: Long Baseline Neutrino Facility/Deep Underground Neutrino...

    Broader source: Energy.gov (indexed) [DOE]

    May 27, 2015 EA-1943: Draft Environmental Assessment Long Baseline Neutrino FacilityDeep Underground Neutrino Experiment (LBNFDUNE) at Fermilab, Batavia, Illinois and the...

  4. NETL - Bituminous Baseline Performance and Cost Interactive Tool...

    Open Energy Info (EERE)

    from the Cost and Performance Baseline for Fossil Energy Plants - Bituminous Coal and Natural Gas to Electricity report. The tool provides an interactive summary of the full...

  5. Chile-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Info (EERE)

    Kenya, Mexico, South Africa, Thailand and Vietnam), to share practices on setting national greenhouse gas emissions baseline scenarios. The aim of the workstream is to...

  6. Ethiopia-National Greenhouse Gas Emissions Baseline Scenarios...

    Open Energy Info (EERE)

    National Greenhouse Gas Emissions Baseline Scenarios: Learning from Experiences in Developing Countries Jump to: navigation, search Name Ethiopia-National Greenhouse Gas Emissions...

  7. NREL: Energy Analysis - Annual Technology Baseline and Standard...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Technology Baseline and Standard Scenarios Discussion Draft of NREL 2016 Annual ... and a diverse set of potential futures (standard scenarios) to inform electric sector ...

  8. River Corridor Baseline Risk Assessment (RCBRA) Human Health...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB ...

  9. Refinery Integration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mary Biddy Sue Jones NREL PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review Refinery Integration 4.1.1.31 NREL 4.1.1.51 PNNL Goal Statement GOALS: Model bio-intermediates insertion points to better define costs & ID opportunities, technical risks, information gaps, research needs Publish results Review with stakeholders 2 Leveraging existing refining infrastructure

  10. 2012 CERTS LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Extension of Direct Load Management of Smart Loads Anna Scaglione, UC Davis GRA: Mahnoosh Alizadeh Project objective  Invent methods to "store" load demand for * Real-time "generation following" * Integration of load reserves as dispatchable assets in the Energy Market  Architecture for virtual "reserves" (queues) of electrical load demand * Watts to Job mapping (analysis)  Captures digitally the service requirements - Equal service type = Equal queue *

  11. Tank Waste Remediation System (TWRS) Technical Baseline Summary Description

    SciTech Connect (OSTI)

    TEDESCHI, A.R.

    2000-04-21

    This revision notes the supersedure of the subject document by concurrent issuance of HNF-1901 ''Technical Baseline Summary Description for the Tank Farm Contractor'', Revision 2. Safe storage mission technical baseline information was absorbed by the new revision of HNF-1901.

  12. Tank waste remediation system technical baseline summary description

    SciTech Connect (OSTI)

    Raymond, R.E.

    1998-01-08

    This document is one of the tools used to develop and control the mission work as depicted in the included figure. This Technical Baseline Summary Description document is the top-level tool for management of the Technical Baseline for waste storage operations.

  13. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  14. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    SciTech Connect (OSTI)

    Iovenitti, Joe

    2013-05-15

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  15. Integrated Project Team RM

    Office of Environmental Management (EM)

    ... conducts interviews, document reviews, walk downs, and observations as necessary. ... 2003 * Letter April 18, 2007, Dae Chung to Jim Rispoli, Integrated Project Team Capability ...

  16. Application of non-radiometric methods to the determination of plutonium. Literature review conducted for the Buried Waste Integrated Program

    SciTech Connect (OSTI)

    Edelson, M.C.

    1992-03-05

    This literature review was motivated by discussions that took place during a review of contamination control technologies proposed for INEL (buried waste). It should be a useful tool in identifying non-radiation measurement techniques for Pu and Am such as ICP-MS, which should fulfill the following criteria: apparatus must be field deployable; up to 100 samples per day; and lower levels of detection and required time must be listed. The sensitivity of ICP and RIMS is compared against that needed for contamination monitoring at INEL. Only Pu-241, with a required detection limit of 400 ppt, would challenge the sensitivity of ICP-MS; Pu-238 would be easily determined. The need to determine Pu-238 and Am-241 in the presence of U-238 and Pu-241 seems to preclude the possibility of using laser ablation ICP-MS for Pu monitoring. ICP-AES and -LEAFS methods may not have enough sensitivity to determine Pu-238 at 2 ppb level with confidence, but RIMS (resonance ionization mass spectroscopy) should be adequate. 47 refs, figs.

  17. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flow sheet simulation (PFS) model. This report summarizes the activities completed during the period December 23, 1992 through March 15, 1992. In Task 1, Baseline Design and Alternates, the following activities related to the tradeoff studies were completed: approach and basis; oxygen purity; F-T reactor pressure; wax yield; autothermal reformer; hydrocarbons (C{sub 3}/C{sub 4}s) recovery; and hydrogenrecovery. In Task 3, Engineering Design Criteria, activities were initiated to support the process tradeoff studies in Task I and to develop the environmental strategy for the Illinois site. The work completed to date consists of the development of the F-T reactor yield correlation from the Mobil dam and a brief review of the environmental strategy prepared for the same site in the direct liquefaction baseline study.Some work has also been done in establishing site-related criteria, in establishing the maximum vessel diameter for train sizing and in coping with the low H{sub 2}/CO ratio from the Shell gasifier. In Task 7, Project Management and Administration, the following activities were completed: the subcontract agreement between Amoco and Bechtel was negotiated; a first technical progress meeting was held at the Bechtel office in February; and the final Project Management Plan was approved by PETC and issued in March 1992.

  18. Review and Status of Wind Integration and Transmission in the United States. Key Issues and Lessons Learned

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Acker, T.; Ahlstrom, M.; Frew, B.; Goggin, M.; Lasher, W.; Marquis, M.; Osborn, D.

    2015-03-01

    The objective in electric power system operation is to use generation and transmission resources within organizational constraints and operational rules and regulations to reliably and costeffectively balance load and generation. To meet this objective, system operational practices have been created to accommodate the innate variability and uncertainty that comes from a variety of sources, such as uncertainty of demand forecasts, whether a specific generating unit will be available when called upon, the variability of demand from many different types of customers, and others. As more wind power is connected to the power system, operating experiences acquired during the past several years have generally confirmed the findings of wind integration studies: wind energy increases the level of variability and uncertainty that a system operator must manage.

  19. 2010 DOE EERE Vehicle Technologies Program Merit Review … Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration 2010 DOE EERE Vehicle Technologies Program Merit Review Technology Integration Technology integration merit review results PDF icon 2010amr08.pdf ...

  20. Baseline design/economics for advanced Fischer-Tropsch technology

    SciTech Connect (OSTI)

    Not Available

    1992-04-27

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis, and the computer model will be the major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide, and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal.

  1. Mechanical integrity implementation and related process safety management elements

    SciTech Connect (OSTI)

    Hudson, K.M. [General Physics Corp., San Diego, CA (United States)

    1995-12-31

    The OSHA Process Safety Management (PSM) rule requires covered facilities to establish a mechanical integrity (MI) program. The MI program must address an ongoing effort to maintain the integrity of process equipment and safety systems by providing written procedures, training, inspection and testing, and quality assurance. Development of an MI program requires information from other PSM elements such as equipment process safety information and employee participation as building blocks for the program. Information obtained from other elements of PSM can be used as the basis for inspection and testing, frequency of testing, written maintenance procedures, training of maintenance personnel, and quality assurance of spare parts and newly installed equipment. This paper presents highlights in the implementation of a mechanical integrity program. A description of the use of process safety information and baseline inspections is detailed with appropriate examples. The MI program stems from an initial documentation review, and culminates in a completely functional MI program in compliance with the regulation.

  2. Hanford Site baseline risk assessment methodology. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site.

  3. Draft of M2 Report on Integration of the Hybrid Hydride Model into INL's MBM Framework for Review

    SciTech Connect (OSTI)

    Tikare, Veena; Weck, Philippe F.; Schultz, Peter A.; Clark, Blythe; Glazoff, Michael; Homer, Eric

    2014-07-01

    This report documents the development, demonstration and validation of a mesoscale, microstructural evolution model for simulation of zirconium hydride {delta}-ZrH{sub 1.5} precipitation in the cladding of used nuclear fuels that may occur during long-term dry storage. While the Zr-based claddings are manufactured free of any hydrogen, they absorb hydrogen during service, in the reactor by a process commonly termed ‘hydrogen pick-up’. The precipitation and growth of zirconium hydrides during dry storage is one of the most likely fuel rod integrity failure mechanisms either by embrittlement or delayed hydride cracking of the cladding. While the phenomenon is well documented and identified as a potential key failure mechanism during long-term dry storage (NUREG/CR-7116), the ability to actually predict the formation of hydrides is poor. The model being documented in this work is a computational capability for the prediction of hydride formation in different claddings of used nuclear fuels. This work supports the Used Fuel Disposition Research and Development Campaign in assessing the structural engineering performance of the cladding during and after long-term dry storage. This document demonstrates a basic hydride precipitation model that is built on a recently developed hybrid Potts-phase field model that combines elements of Potts-Monte Carlo and the phase-field models. The model capabilities are demonstrated along with the incorporation of the starting microstructure, thermodynamics of the Zr-H system and the hydride formation mechanism.

  4. Vehicle Technologies Office Merit Review 2015: Impact Analysis: VTO

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Baseline and Scenario (BaSce) Activities | Department of Energy Impact Analysis: VTO Baseline and Scenario (BaSce) Activities Vehicle Technologies Office Merit Review 2015: Impact Analysis: VTO Baseline and Scenario (BaSce) Activities Presentation given by Argonne National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about impact analysis: VTO baseline and scenario (BaSce) activities.

  5. OSTIblog Articles in the Long Baseline Neutrino Experiment Topic...

    Office of Scientific and Technical Information (OSTI)

    Long Baseline Neutrino Experiment Topic Mining for Gold, Neutrinos and the Neutrinoless ... The site of the former Homestake Mine was once one of the largest and deepest gold mines ...

  6. U.S Department of Energy Performance Baseline Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-23

    This guide identifies key Performance Baseline (PB) elements, development processes, and practices; describes the context in which DOE PB development occurs; and suggests ways of addressing the critical elements in PB development.

  7. Biodiversity Research Institute Mid-Atlantic Baseline Study Webinar

    Broader source: Energy.gov [DOE]

    Carried out by the Biodiversity Research Institute (BRI) and funded by the U.S. Department of Energy Wind and Water Power Technology Office and other partners, the goal of the Mid-Atlantic Baseline...

  8. Cost and Performance Baseline for Fossil Energy Plants Volume...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    www.netl.doe.gov This page intentionally left blank Cost and Performance Baseline for Coal-to-SNG and Ammonia (Volume 2) i Table of Contents LIST OF EXHIBITS......

  9. Baselines For Land-Use Change In The Tropics: Application ToAvoided Deforestation Projects

    SciTech Connect (OSTI)

    Brown, Sandra; Hall, Myrna; Andrasko, Ken; Ruiz, Fernando; Marzoli, Walter; Guerrero, Gabriela; Masera, Omar; Dushku, Aaron; Dejong,Ben; Cornell, Joseph

    2007-06-01

    /infrastructure factors(less observable) in explaining empirical land-use patterns. We proposefrom the lessons learned, a methodology comprised of three main steps andsix tasks can be used to begin developing credible baselines. We alsopropose that the baselines be projected over a 10-year period because,although projections beyond 10 years are feasible, they are likely to beunrealistic for policy purposes. In the first step, an historic land-usechange and deforestation estimate is made by determining the analyticdomain (size of the region relative to the size of proposed project),obtaining historic data, analyzing candidate historic baseline drivers,and identifying three to four major drivers. In the second step, abaseline of where deforestation is likely to occur --a potential land-usechange (PLUC) map is produced using a spatial model such as GEOMOD thatuses the key drivers from step one. Then rates of deforestation areprojected over a 10-year baseline period using any of the three models.Using the PLUC maps, projected rates of deforestation, and carbon stockestimates, baselineprojections are developed that can be used for projectGHG accounting and crediting purposes: The final step proposes that, atagreed interval (eg, +10 years), the baseline assumptions about baselinedrivers be re-assessed. This step reviews the viability of the 10-yearbaseline in light of changes in one or more key baseline drivers (e.g.,new roads, new communities, new protected area, etc.). The potentialland-use change map and estimates of rates of deforestation could beredone at the agreed interval, allowing the rates and changes in spatialdrivers to be incorporated into a defense of the existing baseline, orderivation of a new baseline projection.

  10. Hanford Site waste treatment/storage/disposal integration

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    1999-02-24

    In 1998 Waste Management Federal Services of Hanford, Inc. began the integration of all low-level waste, mixed waste, and TRU waste-generating activities across the Hanford site. With seven contractors, dozens of generating units, and hundreds of waste streams, integration was necessary to provide acute waste forecasting and planning for future treatment activities. This integration effort provides disposition maps that account for waste from generation, through processing, treatment and final waste disposal. The integration effort covers generating facilities from the present through the life-cycle, including transition and deactivation. The effort is patterned after the very successful DOE Complex EM Integration effort. Although still in the preliminary stages, the comprehensive onsite integration effort has already reaped benefits. These include identifying significant waste streams that had not been forecast, identifying opportunities for consolidating activities and services to accelerate schedule or save money; and identifying waste streams which currently have no path forward in the planning baseline. Consolidation/integration of planned activities may also provide opportunities for pollution prevention and/or avoidance of secondary waste generation. A workshop was held to review the waste disposition maps, and to identify opportunities with potential cost or schedule savings. Another workshop may be held to follow up on some of the long-term integration opportunities. A change to the Hanford waste forecast data call would help to align the Solid Waste Forecast with the new disposition maps.