Powered by Deep Web Technologies
Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - EIA-914 Instructions_Expiration Date 09202012.doc  

U.S. Energy Information Administration (EIA) Indexed Site

205 205 Washington, DC 20585 Expiration Date: 09/20/2012 INSTRUCTIONS for FORM EIA-914 MONTHLY NATURAL GAS PRODUCTION REPORT PURPOSE The Energy Information Administration's (EIA) Form EIA-914 Monthly Natural Gas Production Report collects information on natural gas production by operators in the United States. Data are collected pursuant to the Federal Energy Administration (FEA) Act of 1974, Public Law 93-275. This report is mandatory under the FEA Act. The aggregated data will appear in EIA publications Natural Gas Annual, Monthly Energy Review, and Natural Gas Monthly, and on EIA's website http://www.eia.gov. REPORTING REQUIREMENTS Report must be completed by selected operators of oil and gas wells in the United States that produce natural

2

Due date assignment using ADRES and simulated annealing  

Science Journals Connector (OSTI)

In this paper, flowtime estimation and/or Due Date Assignment (DDA) is studied by making use of a statistical technique, namely Adaptive Response Rate Exponential Smoothing (ADRES) and Simulated Annealing (SA). Primary objective of this study is to compare accuracies of the Due Date Assignment Models (DDAMs). In order to achieve this objective, simulation models are constructed representing different shop load level and using different despatching rules. Case by case findings are summarised in this paper.

Adil Baykasoglu; Mustafa Gocken; Zeynep D. Unutmaz

2008-01-01T23:59:59.000Z

3

Online Pipeline Transportation of Petroleum Products with no Due Dates 1  

E-Print Network (OSTI)

On­line Pipeline Transportation of Petroleum Products with no Due Dates 1 Ruy Luiz Milidi'u milidiu, 2001 Abstract: In this paper, we introduce a new model for pipeline transportation of petroleum products without due dates. We use a directed multigraph G where arcs represent pipes and nodes represent

Endler, Markus

4

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

5

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

6

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

7

Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

neutrino oscillation fits MiniBooNE Collaboration (Dated: May 2009) The May 2009 dataset reflects the different fit method involved in the up- dated analysis, which simultaneously...

8

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

9

INSTRUCTIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INSTRUCTIONS" INSTRUCTIONS" "* Spreadsheet is protected without a password. To unprotect, go to ." "* Project characteristic factors are listed at the end of this spreadsheet, and its values can be modified. If modified, please document accordingly." "* Spreadsheet is protected for entry only in the yellow highlighted cells allowing for up to 10 projects and/or a project with 10 FY spend profiles." "* For project characteristics except PV and PF, please select from the cell's pull down list." "* The general outputs are in the gray highlighted cells." "INPUT (instructions - enter data only in yellow highlighted cells)" "general information",,,,"project characteristics",,,,,,,,,,"comments"

10

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

11

Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

antineutrino oscillation fits MiniBooNE Collaboration (Dated: May 2009) The May 2009 dataset reflects the different fit method involved in the an- tineutrino analysis, which...

12

Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

April 2007 MiniBooNE public data for muon-to-electron neutrino oscillation fits MiniBooNE collaboration (Dated: April 2007) I. MINIBOONE PUBLIC DATA, AND NOTATION The following...

13

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

14

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

15

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

16

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

17

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

18

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

19

Cluster Report or Survey Description Date due to IEA Responsible person(s) Comments Summer Activity Report  

E-Print Network (OSTI)

Cluster Report or Survey Description Date due to IEA Responsible person(s) Comments Summer Activity Report Activity reports for Summer, 2013 January 31, 2014 Academic Department Heads By December 13, 2013, data is provided by IEA for report completion. Fall Activity Report Activity reports for Fall, 2013

Fernandez, Eduardo

20

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

22

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

23

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

24

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

25

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

26

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

27

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

28

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

29

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

30

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

31

Microsoft Word - Lab call doc TEMPLATE ver 11.3 _may 3rd due date_.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

RESEARCH CALL TO DOE/FEDERAL LABORATORIES RESEARCH CALL TO DOE/FEDERAL LABORATORIES Technical Support for Interconnection-Level Electric Infrastructure Planning RC-BM-2010 CONTACT: Brian Mollohan, Project Manager TELEPHONE NUMBER: (304) 285-1367 FAX NUMBER: (304) 285-4403 E-MAIL: brian.mollohan@netl.doe.gov ISSUING OFFICE: U.S. DEPARTMENT OF ENERGY National Energy Technology Laboratory 3610 Collins Ferry Road, P. O. Box 880 Morgantown, WV 26507-0880 ISSUE DATE: April 1, 2010 DUE DATE: May 3, 2010 This Research Call uses funding from "The American Recovery and Reinvestment Act of 2009" and will be subject to special reporting requirements. The reporting requirements and other details will be provided later. 2 TABLE OF CONTENTS SECTION I - GENERAL INFORMATION

32

Microsoft Word - Lab call doc TEMPLATE ver 11.3 _may 3rd due date_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESEARCH CALL TO DOE/FEDERAL LABORATORIES RESEARCH CALL TO DOE/FEDERAL LABORATORIES Technical Support for Interconnection-Level Electric Infrastructure Planning RC-BM-2010 CONTACT: Brian Mollohan, Project Manager TELEPHONE NUMBER: (304) 285-1367 FAX NUMBER: (304) 285-4403 E-MAIL: brian.mollohan@netl.doe.gov ISSUING OFFICE: U.S. DEPARTMENT OF ENERGY National Energy Technology Laboratory 3610 Collins Ferry Road, P. O. Box 880 Morgantown, WV 26507-0880 ISSUE DATE: April 1, 2010 DUE DATE: May 3, 2010 This Research Call uses funding from "The American Recovery and Reinvestment Act of 2009" and will be subject to special reporting requirements. The reporting requirements and other details will be provided later. 2 TABLE OF CONTENTS SECTION I - GENERAL INFORMATION

33

OGC Mini-Grant Application 2011 Instructions  

E-Print Network (OSTI)

OGC Mini-Grant Application 2011 Instructions Due: To the awesome Vice Treasurer by due date sent- grant committee will consider the quality of the written essays when ranking the applications the mini-grant committee will consider when ranking applications. Remember, these are guidelines ONLY

34

EIA-912 Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

OMB No. 1905-0175 Expiration Date: 12312017 EIA-912 WEEKLY UNDERGROUND NATURAL GAS STORAGE REPORT INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form...

35

GRADUATE STUDENT HANDBOOK TEMPLATE Effective Date of Handbook: Fall of each academic year A hard copy is due in  

E-Print Network (OSTI)

Department Graduate Handbook does not deviate from established Graduate School Policies httpGRADUATE STUDENT HANDBOOK TEMPLATE NOTE: Effective Date of Handbook: Fall of each academic year is to be provided with a hard copy of each department's Graduate Student Handbook by the first day of classes each

Tennessee, University of

36

cial Mathematics Instruction Special Mathematics Instruction Special Mathematics Instruction S hematics Instruction Special Mathematics Instruction Special Mathematics Instruction Special M  

E-Print Network (OSTI)

SMI cial Mathematics Instruction Special Mathematics Instruction Special Mathematics Instruction S hematics Instruction Special Mathematics Instruction Special Mathematics Instruction Special M ruction Special Mathematics Instruction Special Mathematics Instruction Special Mathematics In cial Mathematics

Vaswani, Namrata

37

InstructIons  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

InstructIons InstructIons for AccessIng fedconnect PostIngs The registration process requires multiple steps prior to submission, so please plan in advance as late applications will not be accepted. Note that for some applications, a Letter of Intent must be filed prior to the final deadline. To access the complete postings, follow the below steps: 1. Go to https://www.FedConnect.net/ 2. Click on "Search Public Opportunities" 3. Select "Reference Number" in the Search Criteria drop down box and then enter the Reference Number of the funding opportunity you are interested in (DE-FOA-XXXXXXX), followed by clicking the "Search" button 4. Click on the appropriate link after search results are displayed

38

RFP Instructions to Offerors  

NLE Websites -- All DOE Office Websites (Extended Search)

ITO (Rev. 10.1, 2/27/13) Instructions to Offerors ITO (Rev. 10.1, 2/27/13) Instructions to Offerors Dated 5-24-13 RFP No. 241314 Page 1 of 17 Los Alamos National Security, LLC (LANS) Los Alamos National Laboratory (LANL) REQUEST FOR PROPOSAL INSTRUCTIONS TO OFFERORS TABLE OF CONTENTS No. Title Page 1. GENERAL (Mar 2012)...................................................................................................................... 2 2. AMENDMENT OF SOLICITATION (Mar 2012) ............................................................................... 2 3. PREPARATION AND SUBMISSION OF PROPOSALS (Feb 2013 - Deviation) ............................. 2 4. BASIS OF AWARD - BEST VALUE (Mar 2012) ............................................................................. 7 5. OTHER AWARD CONSIDERATIONS (Mar 2012) ........................................................................ 10

39

Information and Instructions for Your Office Hours  

E-Print Network (OSTI)

Aug 7, 2014 ... INFORMATION on OFFICE HOURS and INSTRUCTIONS for TAOH. Please view rather than print this information. Current dates can be found ...

Dominic Naughton

2014-08-07T23:59:59.000Z

40

KMD Search Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

KMD Search Instructions KMD Search Instructions KMD Search Instructions Using the Document Database KMD Logo In this search form you can search the title and abstract of documents that have been stored in an SQL database. The more key words that are entered by the user will allow a more focused search (e.g. Appalachian Basin Shale Gas drilling) and return the most relevant results with the most recent date. This database includes oil and gas documents from the CD/DVD library, the NETL Internet site, the NETL Project Management Information System (ProMIS), the Tulsa Project Office, and links to hardcopy documents currently available from the NETL library. Links to relevant offsite documents from the Office of Science and Technical Information (OSTI) are also included. Restricted Characters in searches

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Physics 227 Winter, 1998 Problem Set 4 Due date: Monday, February 2 4.1 Energy current and the Poynting vector This problem is intended to integrate things you covered last  

E-Print Network (OSTI)

Physics 227 Winter, 1998 Problem Set 4 Due date: Monday, February 2 4.1 Energy current) Relate this flux to the rate of energy dissipation in the resistor. 4.2 transformation of velocity piece of material that gives an electrical signal when a cosmic ray passes through it. Two

Witten, Thomas A.

42

Internal Patent Instructions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Internal Patent Instructions Internal Patent Instructions Internal Patent Instructions The internal patent instructions (IPIs) were originally established as a means for providing a common reference source to all patent counsel offices on centralized instructions, as stated in the memorandum, Establishment of ERDA Internal Patent Instructions (IPI), dated, July 29, 1977. The IPIs will now be made available through this URL site and will be reviewed annually during the month of June. The field offices are encouraged to submit comments or suggestions for improving or updating the IPIs for the listed categories or for proposing draft IPIs that may prove beneficial. Claims and Litigation No documents available. Contracts and Contract Administration Electronic Lab Notebooks (2/14/03) Background Rights in Patents and Inventions (9/18/04)

43

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

44

Reviewer Instructions:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reviewer Instructions: Reviewer Instructions: 1. All review comments to be provided electronically using this review form. 2. Focus the review on substantive issues within your disciplinary, regulatory, or policy area. 3. Look only at the portions relevant to your agency and the land under your management. The individual land management agencies will be amending land use plans or issuing a Record of Decision, so please don't alter the other agencies' roles and responsibilities. 4. Target the review on the adequacy and reasonableness of text and analyses within your disciplinary, regulatory, or policy area. Please be aware that this is a programmatic EIS. 5. All comments should be as specific as possible. Comments such as "text unclear" or "expand" do not provide sufficient

45

Dynamic Instruction Fusion  

E-Print Network (OSTI)

SANTA CRUZ DYNAMIC INSTRUCTION FUSION A thesis submitted in4 2.2 Instruction Fusion & Complex10 3.1 Fusion Selection

Lee, Ian

2012-01-01T23:59:59.000Z

46

NETL: Energy Analysis - Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Analysis Instructions Using the Database In this search form you can search using the following tools: Title and Synopsis/Keywords Author Program/Technology Publication Type Publication Date Title and Synopsis/Keywords Enter as many keywords as needed but remember that all keywords would have to be included within the Title/Synopsis to receive a return. Select the KEYWORD SEARCH checkbox if you want it to return on any word. For greater returns, limit the amount of keywords entered per search. Use the plus sign (+) to search for a multi-word phrase. For example, to find the phrase "2010 Coal Database", enter "2010+Coal+Database". This will return results that contain matches on this three word phrase. Author It is best to search on an author's last name since first name might be stored as initials or an abbreviation such as Tom or Thomas.

47

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

48

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

49

Instructions and Materials  

Energy.gov (U.S. Department of Energy (DOE))

The following are 2012 Program Peer Review Meeting instructions, materials and resource links for presenters and reviewers.

50

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, , ' > POLICY FLASH 2010-47 May 6,2010 Procurement Directors FROM: Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter/ Financial Assistance Letter (AL/FAL 2010-05) - Contract Periods of Performance Exceeding 5 Years SUMMARY: AL/FAL 2010-05 provides guidance and instructions with respect to the Department of Energy's processes and procedures for approving contract periods of performance in excess of five years under the requirements of Federal Acquisition Regulation (FAR) 17.204(e). This FAR permissive authority is intended to allow agencies the flexibility, consistent with fiscal law, labor law, and other restrictions, to address the requirements of an instant acquisition and seek approval to extend the contract period of performance beyond 5 years as

51

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

52

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

53

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

54

FedConnect Instructions  

Energy.gov (U.S. Department of Energy (DOE))

Here are instructions to make it easier to locate Funding Opportunity Announcements (FOAs) for the Geothermal Technologies Office at the FedConnect Web site.

55

ERIP application instructions  

SciTech Connect

This report provides background information and instructions to assist applicants in writing Energy-Related Inventions Program (ERIP) applications. Initial feedback fro usage for the new instructions shows that the best instructions would not be read and followed by all applicants. Applications from more than thirty applicants who have received the new instructions indicated that few had read the instructions. Based on this feedback, the instructions have been further revised to include a title page and table of contents. A warning was also added to advise applicants of the potential penalty of delayed review if these instructions are not followed. This revision was intended to address the possibility that some applicants did not see or bother to follow the instructions which followed the background information about ERIP. Included are two examples of ERIP applications which have been prepared for handout at workshops or mailing to applicants. Writing of example applications was time consuming and more difficult than expected for several reasons: (1) Full disclosures can be lengthy, very detailed, and technical. This contrasts with the desire to prepare examples which are comparatively short and easy for the non-technical person to read. (2) Disclosures contain confidential information which should not be published. (3) It is difficult to imagine that applicants will study examples when they do not bother to read the basic instructions.

Watt, D.M.

1992-01-02T23:59:59.000Z

56

File:AlaskaTitleVApplicationSubmittalInstructions.pdf | Open Energy  

Open Energy Info (EERE)

AlaskaTitleVApplicationSubmittalInstructions.pdf AlaskaTitleVApplicationSubmittalInstructions.pdf Jump to: navigation, search File File history File usage File:AlaskaTitleVApplicationSubmittalInstructions.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 20 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:34, 1 November 2012 Thumbnail for version as of 11:34, 1 November 2012 1,275 × 1,650 (20 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from

57

Microsoft Word - Final Instructions_20110425.docx  

U.S. Energy Information Administration (EIA) Indexed Site

1905-0194 1905-0194 Expiration Date: 10/31/2013 20110425 Instructions for Form EIA-1605 Voluntary Reporting of Greenhouse Gases Revised Pursuant to 10 CFR Part 300 Guidelines for Voluntary Greenhouse Gas Reporting U.S. Energy Information Administration U.S. Department of Energy November 18, 2010 U.S. Department of Energy U.S. Energy Information Administration Form EIA-1605 Voluntary Reporting of Greenhouse Gases Form Approved OMB No. 1905-0194 Expiration Date: 10/31/2013 November 18, 2010 Voluntary Reporting of Greenhouse Gases Table of Contents Introduction ................................................................................................................................1 What Is the Purpose of Form EIA-1605? .............................................................................1

58

Department of Defense INSTRUCTION  

E-Print Network (OSTI)

Transfers of Technology, Articles, and Services References: See Enclosure 1 1. PURPOSE. This Instruction: a. Establishes policy, assigns responsibility, and provides instructions for the international transfer of dual. Applies to all means of technology transfer and shall be implemented through such processes as dual

59

I INSTRUCTIONS: FROM: Accountability Station Energy Library, AD-622.1/GTN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I INSTRUCTIONS: FROM: Accountability Station Energy Library, AD-622.1/GTN U.S. Department of Energy P.O. Box A Germantown, MD 20874 Document Number Copy Series Classi- fication Date Due TO: I have personally received the material identified above and assume full responsibility for its safe handling in accordance with existing regulations. Date Signature Postal Registry No. AD F 1430.1 (11-92) U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. ENERGY LIBRARY CLASSIFIED RECEIPT NO. T 1. Original of this receipt to be signed personally by recipient and returned to 2. See other side. (OVER) TRIPLICATE DUPLICATE ORIGINAL TRIPLICATE DUPLICATE ORIGINAL U.S. DEPARTMENT OF ENERGY

60

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 29, 2007 INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" i Contents I. Introduction ......................................................................................................................1 A. Purpose..................................................................................................................1 B. Authority ...............................................................................................................1 C. Organization and Oversight ..................................................................................1 D. Overarching Policy and Directives .......................................................................4

62

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM024-04  

E-Print Network (OSTI)

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM024-04 TITLE REPLACES PAGE Exonuclease and SAP cleanup of samples for sequencing LM024-03 1(2) LM007 ISSUED BY SIGNATURE DATE EFFECTIVE INSTRUCTION LM024-04 TITLE REPLACES PAGE Exonuclease and SAP cleanup of samples for sequencing LM024-03 2

Uppsala Universitet

63

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM028-03  

E-Print Network (OSTI)

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM028-03 TITLE REPLACES PAGE Cleaning sequencing reactions with BigDye® XTerminatorTM Purification Kit LM028-02 1(3) ISSUED BY SIGNATURE DATE tips. #12;DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM028-03 TITLE REPLACES PAGE

Uppsala Universitet

64

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM027-04  

E-Print Network (OSTI)

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM027-04 TITLE REPLACES PAGE Sequence reaction BigDye 3.1 LM027-03 1(3) ISSUED BY SIGNATURE DATE EFFECTIVE NAME Gunilla Kärf 2013-02-19 1 GENERAL more DNA: #12;DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM027-04 TITLE REPLACES PAGE

Uppsala Universitet

65

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM029-06  

E-Print Network (OSTI)

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM029-06 TITLE REPLACES PAGE Preparing genotyping samples for ABI3730xl LM029-05 1(4) ISSUED BY SIGNATURE DATE EFFECTIVE NAME Malin Johansson 2012, UPPSALA UNIVERSITY INSTRUCTION LM029-06 TITLE REPLACES PAGE Preparing genotyping samples for ABI3730xl LM

Uppsala Universitet

66

Finance Department Accounts Payable PCRF June 2013 Instructions  

E-Print Network (OSTI)

Finance Use Only Subtotal For detailed instructions on the HST/GST rebate, see calculator at http://www.yorku.ca/finance/documents/rebate_calc.xls 001623 200 233009 GST rebatable expenses $ x 0.0258 Checked by Date 001680 200 233009 HST rebatable

67

lead-isotope dating  

Science Journals Connector (OSTI)

lead-isotope dating, lead-lead dating, lead-isotope age measurement, lead-lead age measurement ? Blei-Isotopen(-Alters)bestimmung, f, Blei-Isotopen-Datierung

2014-08-01T23:59:59.000Z

68

Procedures and Instructions | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Records Management Procedures and Instructions Procedures and Instructions Records Management Processes Procedure for Conducting a Records Inventory (PDF) Procedure for...

69

INSTRUCTIONS FOR SUBMITTING NUCLEAR  

E-Print Network (OSTI)

waste management proceedings. Keywords Nuclear, nuclear power plant, spent fuel, nuclear waste, dataCALIFORNIA ENERGY COMMISSION INSTRUCTIONS FOR SUBMITTING NUCLEAR POWER PLANT-RELATED DATA of Submitted Data 3 NUCLEAR POWER PLANT DATA REQUESTS 6 A. Environmental Impacts 6 B. Spent Fuel Generation 8 C

70

EIA-191 Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

1 U.S. DEPARTMENT OF ENERGY Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 12312017 MONTHLY UNDERGROUND GAS STORAGE...

71

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

72

ORISE: Instructional Design and Development  

NLE Websites -- All DOE Office Websites (Extended Search)

Instructional Design and Development Instructional Design and Development The Oak Ridge Institute for Science and Education (ORISE) works with government agencies and organizations to create customized training and instructional design programs, from traditional classroom teaching to online education. ORISE uses a multi-step process to define the instructional design and development needs. Our process includes: Defining the target audience and objectives Designing and developing the program and materials Piloting, delivering and managing the training Evaluating the final product Whether a small- or large-scale effort, ORISE helps determine the most effective approach based on needs and resources, which may include: Collaborative experiences Interactive simulations Self-paced tutorials Guided instructions

73

Date created: Date amended: February 2009  

E-Print Network (OSTI)

or on any relevant individual issue � Determining what types of risk are acceptable and which appetite is usually defined as "the amount of risk that an organisation is prepared to accept, tolerateDate created: Date amended: February 2009 - 1 � Risk Management Policy.doc RISK MANAGEMENT POLICY 1

Subramanian, Sriram

74

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network (OSTI)

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST PROCEDURE SELECTION LIST ­ HEALTHCARE IT TESTING NVLAP HEALTHCARE IT TESTING APPLICATION (2013-01-02) PAGE 1 OF 3 Instructions: Please check the method for which you are requesting accreditation. NVLAP Code Test Procedure Description 2011

75

Math 310 Homework Assignment 6 due date: Oct. 25, 2013  

E-Print Network (OSTI)

G be the element g = p 0 0 1 . 1 #12;(a) Show that gHg-1 H, but gHg-1 = H. The fact you proved in (a) is not a contradiction of the argument in class that the property (3) gHg-1 H for all g G is equivalent to the property (2) gHg-1 = H for all g G. (b) Why isn't this a contradiction? That is, what step

Roth, Mike

76

Math 110 Homework Assignment 9 due date: Nov. 12, 2012  

E-Print Network (OSTI)

question, and that's becuase it's a very good question. It's also a challenging question: it shouldn with a problem of this kind: Something new that you haven't seen before, but something within your powers'd like to know what the values of bn are for n = 2012, 2013, 2014, 2015, 2016, and 2017. So that's your

Roth, Mike

77

COMP 335 Programming Languages Fall 2011 Due Date: October 4  

E-Print Network (OSTI)

program file names should end with .c. · All of your programs should be written in ANSI C. You can use any is as follows: gcc -ansi Ccw.c -o Ccw where ­ gcc = gnu c compiler ­ -ansi = ANSI flag which denotes standard C

Gousie, Michael B.

78

Step by Step Instructions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Step by Step Instructions Step by Step Instructions For Completing An Information Collection Request 1. A determination must be made if a Federal entity has an Information Collection Request (ICR). To assist in making that determination, the Paperwork Reduction Act (PRA)states the following: The PRA requires each Federal agency to seek and obtain Office of Management and Budget (OMB) approval before undertaking a collection of information directed to ten or more people of the general public, including federal contractors, or continuing a collection for which the OMB approval and validity of the OMB control number are about to expire. 2. Once it's been determined that a program has an ICR, the program works with their Headquarters Point of Contact (POC) and prepare a 60-day Federal

79

Station Instruction Cooperative  

E-Print Network (OSTI)

$0 INSTITUTE OF MUSEUM/LIBRARY SV $0 $0 $0 $135,575 $0 $135,575 NATIONAL AERO & SPACE ADMIN $971General Research Experiment Station Instruction Public Service Cooperative Extension Total $96,610,455 23,968,233 14,198,142 ARRA 6,188,801 Public Service (PS) 33,400,117 45,534,482 34,497,464 39

Arnold, Jonathan

80

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Saskatchewan Instructional Development and Research Unit (SIDRU)  

E-Print Network (OSTI)

Saskatchewan Instructional Development and Research Unit (SIDRU) 25th ANNUAL REPORT 2009 2010 Saskatchewan Instructional Development & Research Unit Faculty of Education: SIDRU@uregina.ca #12; CONTENTS SASKATCHEWAN INSTRUCTIONAL DEVELOPMENT & RESEARCH UNIT

Argerami, Martin

82

Instructional Materials | Photosynthetic Antenna Research Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Instructional Materials Instructional Materials Solar Energy Learn about the quality of electromagnetic radiation produced by the sun and investigate on how this energy is captured...

83

Pitch for Solar Instructions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pitch for Solar Instructions Pitch for Solar Instructions SunShot invites visionaries, entrepreneurs, and innovators to share their big ideas to propose solutions that will enable...

84

Instructions for EM Corporate Performance Metrics | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for EM Corporate Performance Metrics Instructions for EM Corporate Performance Metrics Quality Program Criteria Instructions for EM Corporate Performance Metrics More Documents &...

85

Safety System Oversight Staffing Analysis (Instructions, Blank...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety System Oversight Staffing Analysis (Instructions, Blank Sheet and Example Sheet) Safety System Oversight Staffing Analysis (Instructions, Blank Sheet and Example Sheet) This...

86

Microsoft Word - Draft EIA-111 Instructions for 2015 Clearance...  

Gasoline and Diesel Fuel Update (EIA)

these instructions EIA-111 QUARTERLY ELECTRICITY IMPORTS AND EXPORTS REPORT DATA XCHANGE WEB AND XML INSTRUCTIONS ......

87

Form EIA-861 Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

ANNUAL ELECTRIC POWER ANNUAL ELECTRIC POWER INDUSTRY REPORT Form EIA-861 OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden: 9 Hours NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provisions on sanctions and the provisions concerning the confidentiality of information in the instructions. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.

88

Form EIA-861 Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

ANNUAL ELECTRIC POWER ANNUAL ELECTRIC POWER INDUSTRY REPORT INSTRUCTIONS FORM EIA-861 OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden: 9.0 hrs PURPOSE Form EIA-861 collects information on the status of electric power industry participants involved in the generation, transmission, and distribution of electric energy in the United States, its territories, and Puerto Rico. The data from this form are used to accurately maintain the EIA list of electric utilities, to draw samples for other electric power surveys, and to provide input for the following EIA reports: Electric Power Monthly, Monthly Energy Review, Electric Power Annual, Annual Energy Outlook, and Annual Energy Review. The data collected on this form are used to monitor the current status and trends of the electric power industry and to evaluate the future

89

Microsoft Word - EIA-910 Instructions.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Page 1 Page 1 U.S. DEPARTMENT OF ENERGY Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 02/28/2015 MONTHLY NATURAL GAS MARKETER SURVEY FORM EIA-910 INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-910, "Monthly Natural Gas Marketer Survey," is used to collect information on natural gas sales from marketers in selected States that have active customer choice programs. The EIA is requesting information on the volume and revenue for natural gas commodity sales, and any receipts for distribution charges and taxes associated with the sale of natural gas. REPORTING REQUIREMENTS Form EIA-910 must be completed by all natural gas marketers with residential and/or commercial customers in the States of Georgia,

90

Microsoft Word - EIA-912 Instructions.doc  

U.S. Energy Information Administration (EIA) Indexed Site

ENERGY INFORMATION ADMINISTRATION Washington, DC 20585 Form Approved OMB No. 1905-0175 Expiration Date: 02/28/2015 EIA-912 WEEKLY UNDERGROUND NATURAL GAS STORAGE REPORT INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-912, "Weekly Underground Natural Gas Storage Report," is used to collect information on weekly inventories of natural gas in underground storage facilities. Data are collected pursuant to the Federal Energy Administration (FEA) Act of 1974, Public Law 93- 275. This report is mandatory under the FEA Act. REPORTING REQUIREMENTS The EIA-912 must be completed by recipients of the Form EIA- 912. Companies receiving notification were statistically selected by the EIA from a listing of all underground natural gas storage

91

Microsoft Word - EIA-191 Instructions.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Form Approved Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 02/28/2015 MONTHLY UNDERGROUND GAS STORAGE REPORT FORM EIA-191 INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-191, "Monthly Underground Gas Storage Report," provides data on the operations of all active underground storage facilities. Data are collected pursuant to the Federal Energy Administration (FEA) Act of 1974, Public Law 93-275. This report is mandatory under the FEA Act. The data appear in the EIA publications Monthly Energy Review, Natural Gas Annual, and Natural Gas Monthly. REPORTING REQUIREMENTS All companies that operate underground natural gas storage fields in the United States must provide the information requested.

92

Microsoft Word - EIA-857 Instructions.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Page 1 U.S. DEPARTMENT OF ENERGY Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 02/28/2015 MONTHLY REPORT OF NATURAL GAS PURCHASES AND DELIVERIES TO CONSUMERS FORM EIA-857 INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers," is designed to collect data on the quantity and cost of natural gas delivered to distribution systems and the quantity and revenue of natural gas delivered to end-use consumers by market sector, on a monthly basis by State. The data appear in the EIA publications, Monthly Energy Review, Natural Gas Annual, and Natural Gas Monthly. REPORTING REQUIREMENTS

93

COUNTRY INSTITUTION SIGNING DATE  

E-Print Network (OSTI)

COUNTRY INSTITUTION SIGNING DATE /RENEWAL WEB SITE ALBANIA University of Tirana 11.12.2001 www /RENEWAL WEB SITE FINLAND JAMK University of Applied Sciences 29.10.2009 www.jamk.fi/ FRANCE Ã?cole INSTITUTION SIGNING DATE /RENEWAL WEB SITE MACEDONIA St. Cyril and Methodius" University of Skopje 11

Di Pillo, Gianni

94

Iraq Produces Date Sugar  

Science Journals Connector (OSTI)

Iraq will soon begin manufacture of sugar from dates as a result of experiments carried out under a UNESCO program by a Swiss scientist. Development of this industry will save the country some $16 million annually formerly spent for imported sugar.Dates ...

1955-04-18T23:59:59.000Z

95

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, , POLICY FLASH 2010-14 .- November 25,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Implementation of the Energy and Water Development and Related Agencies Appropriations Act, 201 0. SUMMARY: Acquisition Letter 20 1 0-0 1 provides implementing instruction and guidance relating to the following General Provisions of the Energy and Water Development and Related Agencies Appropriations Act, 20 10 Implementing instruction and guidance pertaining to Section 3 1 1, which requires advance notification to Congress for certain acquisitions and financial assistance actions, will be provided in a separate AL/FAL. It should be noted that the provision that has historically been included in prior fiscal year

96

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2009-25 POLICY FLASH 2009-25 February 12,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management Federal Assistance Reporting Checklist and Instructions SUMMARY: This Flash forwards a revised Federal Assistance Reporting Checklist and Instructions (Checklist). The two significant revisions to the Checklist are: (1) updating the web links, and (2) replacing financial reporting forms, SF-269, Financial Status Report, SF-269A, Financial Status Report (Short Form), and SF-272, Federal Cash Transactions Report, with one standard government-wide form, SF-425, Federal Financial Report. Contracting Officers are responsible for incorporating this Checklist in all new awards. Furthermore, existing awards must be modified no later than September

97

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

98

Instructions for the Supporting Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

C:\Documents and Settings\loganla\Local Settings\Temporary Internet Files\Content.Outlook\UZP4FQGA\Instructions for the Supporting C:\Documents and Settings\loganla\Local Settings\Temporary Internet Files\Content.Outlook\UZP4FQGA\Instructions for the Supporting Statementrev-includes BH table.doc General Instructions A Supporting Statement must accompany each request for approval of a collection of information. The Supporting Statement must be prepared in the format described below. If an item is not applicable, provide a brief explanation. When Item 17 of the OMB 83-I is checked "YES", Section B of the Supporting Statement must be completed. OMB reserves the right to require the submission of additional information with respect to any request for approval. Instructions for the Supporting Statement Each request for OMB approval of an information collection must include a Supporting

99

Dating the Vinland Map  

ScienceCinema (OSTI)

Scientists from Brookhaven National Laboratory, the University of Arizona, and the Smithsonian Institution used carbon-dating technology to determine the age of a controversial parchment that might be the first-ever map of North America.

None

2013-07-17T23:59:59.000Z

100

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL...  

NLE Websites -- All DOE Office Websites (Extended Search)

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL YEAR BREAKDOWN OF FUNDS ELEMENTS FY FY FY FY FY TOTAL Direct Labor Overhead Materials Supplies Travel Other Direct...

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

SunShot Poster Review Instructions and Information | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Instructions and Information SunShot Poster Review Instructions and Information SunShot Poster Review Instructions and Information, posted for the SunShot Grand Challenge...

102

Instructions for using HSPD-12 Authenticated Outlook Web Access...  

Energy Savers (EERE)

Instructions for using HSPD-12 Authenticated Outlook Web Access (OWA) Instructions for using HSPD-12 Authenticated Outlook Web Access (OWA) Provides instructions for remote Outlook...

103

Finance Department Accounts Payable PERSS June 2013 Instructions: If completing by hand, please print.  

E-Print Network (OSTI)

and Rebate Calculator tool. Explanation Automobile Expenditures Date Description # of KM's Amount @ 45¢ Air Activity Time Location Checked by For detailed instructions on the HST/GST rebate, see calculator at http://www.yorku.ca/finance/documents/rebate_calc.xls 001623 200 233009 GST rebatable expenses $ x 0.0258 001680 200 233009 HST rebatable expenses $ x 0

104

Instructions for Facility Inspection Report 1. Complete Facility Inspection Report for each inspection;  

E-Print Network (OSTI)

on the site diagram) Date of Inspection/ Inspected By Spill Response Kit Materials in Adequate Supply, drum storage areas, fueling areas, and other locations where oil is handled/loaded/unloaded. These are shown on the site diagrams in Appendix A. #12;MONTHLY TANK INSPECTION REPORT Instructions: 1. Complete

105

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

106

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

107

2011 TRAINING DATES January 10-12  

E-Print Network (OSTI)

2011 TRAINING DATES January 10-12 March 1-3 April 11-13 June 7-9 July 26-28 September 6-8 November: Tools and Functionality Professional Development Training Course OVERVIEW ArcGIS Desktop II: Tools come- first serve basis. · The workshop registration cost is $650. Payment is due prior to the training

108

Create Date: Create Time  

E-Print Network (OSTI)

provisions. AB 0074 Ch. 666 Assembly Member Ma Public event action plans and cooperative agreements. AB 0080 Ch. 138 Assembly Member Fong Presidential primary: election date. AB 0082 Ch. 92 * Assembly Assembly Member Fong Elections: new citizens. AB 0089 Ch. 390 * Assembly Member Hill County employees

109

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

110

Using video-oriented instructions to speed up sequence comparison  

Science Journals Connector (OSTI)

......research-article ORIGINAL PAPERS Using video-oriented instructions to speed up sequence...and nucleic sequences, using specialized video instructions. These instructions, SIMD-like...Andrzej.Wozniak@inria.fr Using video-oriented instructions to speed up sequence......

A. Wozniak

1997-04-01T23:59:59.000Z

111

Color theory too: an instructional aid  

E-Print Network (OSTI)

This thesis primarily deals with the conceptualization, design and evaluation of an instructional learning tool. The focus of the instructional aid is to bring an understanding of the theory of color to students in art, architecture...

Thiagarajan, Archana

2012-06-07T23:59:59.000Z

112

PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL ...  

E-Print Network (OSTI)

Apr 16, 2010 ... PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL GRADES. Please view rather than print this information. A version without ...

saerens

2010-04-16T23:59:59.000Z

113

Physics 105 Handbook of Instructions  

E-Print Network (OSTI)

1 Physics 105 Handbook of Instructions Spring 2010 M.J. Madsen Wabash College, Crawfordsville the physical world and can be summa- rized by the following steps: 1. You will be presented a variety of "myths" or stories about some physical situation. 2. You will do background research into the physics models

Madsen, Martin John

114

STATE OF CALIFORNIA WPRS INSTRUCTIONS  

E-Print Network (OSTI)

STATE OF CALIFORNIA WPRS INSTRUCTIONS ued 12/13) CALIFORNIA ENERGY COMMISSION(Iss Wind Performance performance information and wind power purchasing information provided to the Energy Commission has been: Name of Wind Project Operator / Wind Power Purchaser, Address (PO Box and/or Street Address), City

115

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

116

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

117

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

118

Form Date 09.01.2013 Incentive Program for Researchers (IPR)  

E-Print Network (OSTI)

Form Date 09.01.2013 Incentive Program for Researchers (IPR) Intent to Participate Form Instructions The MSU Incentive Program for Researchers (IPR) has been developed to enhance sponsored research program projects so they can participate in IPR. All tenured and tenure-track faculty members, except

Maxwell, Bruce D.

119

OFFICE USE ONLY: Date Entered: App Rating: Complete Incomplete Documents Included  

E-Print Network (OSTI)

OFFICE USE ONLY: Date Entered: App Rating: Complete Incomplete Documents Included: Declaration/ Assessment APPLICATION INSTRUCTIONS: 1. All supporting documentation must be included with the application printed from BearTracks 2. Have you signed the Declaration and Consent form on the last page

MacMillan, Andrew

120

Document Control Template-Instruction_Screen Shot  

NLE Websites -- All DOE Office Websites (Extended Search)

3_ADocument Control Template - Instruction_Screen Shot.doc_Screen ShotPage 1 of 6 3_ADocument Control Template - Instruction_Screen Shot.doc_Screen ShotPage 1 of 6 EOTA - Business Instruction Document Title: Document Control Template - Instruction-Screen Shot Document Number: F-003 Rev. A Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-001, Document Control Process Notify of Changes: EOTA Employees Referenced Document(s): N/A F-003_ADocument Control Template - Instruction_Screen Shot.doc_Screen ShotPage 2 of 6 Revision History: Rev. Description of Change A Initial Release B C D E F-003_ADocument Control Template - Instruction_Screen Shot.doc_Screen ShotPage 3 of 6 EOTA - Business Instruction Document Title: DocTitle Document Number:

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Paleomagnetic Secular Variation (PSV), 137Cs, and Hg dating techniques  

E-Print Network (OSTI)

Portland State University Department of Geology #12;Hg-Mercury contamination dating http fission of Uranium-235 · Due to nuclear weapons testing · Highly water soluble (spreads quickly) · Half

Fountain, Andrew G.

122

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

123

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

124

2014 ALCC Proposals Due  

NLE Websites -- All DOE Office Websites (Extended Search)

ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier (0 Comments) DOE's 2014 call for its ASCR Leadership Computing...

125

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

126

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

127

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

128

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

129

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

130

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

131

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

132

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

133

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

134

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

135

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

136

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

137

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

138

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

139

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

140

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

142

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

143

EIA-782B EXCLUSIONARY LIST INSTRUCTIONS  

U.S. Energy Information Administration (EIA) Indexed Site

782B EXCLUSIONARY LIST INSTRUCTIONS 782B EXCLUSIONARY LIST INSTRUCTIONS The 2011 Exclusionary List has been updated for your use in preparing Form EIA-782B, "Resellers'/Retailers'Monthly Petroleum Product Sales Report." As required under the "General Instructions" for this form, respondents are to exclude all sales to refiners and gas plant operators represented on the list. When using this list, please note the

144

INSTRUCTIONS for COMPLETING SCHEDULE CARD WEB FORMS  

E-Print Network (OSTI)

Mar 22, 2012 ... Instructions for completing schedule card web forms. The following students are required to complete schedule card web forms. • all returning ...

Kelly Beranger

2012-03-22T23:59:59.000Z

145

International Student -Educational Background Instructions: Applicants must complete columns A through I to be considered for admission.  

E-Print Network (OSTI)

: ____________________________________________________________________ Birth Date: Month __________ Day _________ Year ________ A B C D E F G H I Year in School Your Age (City and Country) Language of Instruction Certificates, Diploma and/or Degrees 1 2 3 4 5 6 7 8 9 10 11 of any examination(s) you passed or certificate(s) you received at the end of the school year

Hardy, Christopher R.

146

Instructions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 11 Transmission Planning in the ERCOT Interconnection Warren Lasher Manager, Long-Term Planning and Policy Department of Energy Electricity Advisory Committee 2 October 20, 2011 The ERCOT Region is one of 3 NERC grid interconnections. The ERCOT grid has: * 75% of Texas land * 85% of Texas load * 40,500 miles of transmission lines * 550+ generation units * 68,294 MW peak demand (set 8/3/2011) 1,106 MW of Asynchronous Tie Capacity (820 MW with Eastern Interconnection) 2,877 MW of generation can switch between ERCOT and the Eastern interconnection The ERCOT Interconnection 3 October 20, 2011 The ERCOT wholesale generation market is an "energy-only" market ERCOT administers day-ahead and real- time markets for energy and ancillary services

147

Type Policy Title Here Effective Date: [Insert Date  

E-Print Network (OSTI)

Type Policy Title Here Effective Date: [Insert Date] Policy Statement [Type Statement Text Here] Reason(s) for the Policy [Type Reason Text Here] Primary Guidance to Which This Policy Responds [Type Primary Policy Here ­ If there is NOT a Primary Policy indicate that] Responsible University Office

Salzman, Daniel

148

Absolute Time Radiometric Dating: the source of the dates on  

E-Print Network (OSTI)

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale Radiometric.g. uranium to lead. · The parent element is radioactive, the daughter element is stable. · The decay rate nucleosynthesis. Common Radioactive Elements, Parents and Daughters · Carbon-14, C14 Nitrogen-14, N14 · Uranium

Kammer, Thomas

149

Environmental Health and Instructional Safety Employee Safety  

E-Print Network (OSTI)

Environmental Health and Instructional Safety #12;Employee Safety Page 1 To our University an environment for students, faculty, staff, and visitors that will not adversely affect their health and safety task that is unsafe or hazardous. Environmental Health and Instructional Safety can assist departments

de Lijser, Peter

150

Saskatchewan Instructional Development & Research Unit (SIDRU)  

E-Print Network (OSTI)

Saskatchewan Instructional Development & Research Unit (SIDRU) 26th ANNUAL REPORT 2010 - 2011 Saskatchewan Instructional Development & Research Unit Faculty of Education University of Regina Regina, SK S4S 0A2 Telephone: (306) 585-5142 Fax: (306) 337-8465 E-Mail: SIDRU@uregina.ca #12;CONTENTS SASKATCHEWAN

Argerami, Martin

151

Completion processing for data communications instructions  

DOE Patents (OSTI)

Completion processing of data communications instructions in a distributed computing environment with computers coupled for data communications through communications adapters and an active messaging interface (`AMI`), injecting for data communications instructions into slots in an injection FIFO buffer a transfer descriptor, at least some of the instructions specifying callback functions; injecting a completion descriptor for each instruction that specifies a callback function into an injection FIFO buffer slot having a corresponding slot in a pending callback list; listing in the pending callback list callback functions specified by data communications instructions; processing each descriptor in the injection FIFO buffer, setting a bit in a completion bit mask corresponding to the slot in the FIFO where the completion descriptor was injected; and calling by the AMI any callback functions in the pending callback list as indicated by set bits in the completion bit mask.

Blocksome, Michael A.; Kumar, Sameer; Parker, Jeffrey J.

2014-07-01T23:59:59.000Z

152

DOE Releases Filing Instructions for Federal Risk Insurance for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Filing Instructions for Federal Risk Insurance for New Nuclear Power Plants DOE Releases Filing Instructions for Federal Risk Insurance for New Nuclear Power Plants December 21,...

153

POLICY BULLETIN: POL-5- Declassification Instruction "25X1-human"  

Energy.gov (U.S. Department of Energy (DOE))

Provides instructions on the appropriate action to take when classification guide topics or source documents cite "25X1-human" declassification instructions.

154

Instructional video + video + GRR + presentations | OpenEI Community  

Open Energy Info (EERE)

Instructional video + video + GRR + presentations Home Kyoung's picture Submitted by Kyoung(155) Contributor 17 July, 2012 - 09:35 GRR Informational Presentations Instructional...

155

Instructions for Grant and Loan Recipients | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1512InstructionsGrantandLoan.pdf More Documents & Publications DOE Supplemental Instructions for OMB Section 1512 Reporting - For Grant and Loan Recipients Slide 1 Slide 1...

156

BLM - Instruction Memorandum No. 2009-167 | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: BLM - Instruction Memorandum No. 2009-167 Abstract This instruction memorandum emphasizes the...

157

Attachment 3: Instructions for Use of Green Lease Solicitation...  

NLE Websites -- All DOE Office Websites (Extended Search)

3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart Attachment 3: Instructions for Use of Green Lease Solicitation Paragraph Reference Chart...

158

Nevada Proof of Application of Water to Beneficial Use Instructions...  

Open Energy Info (EERE)

to Beneficial Use InstructionsPermittingRegulatory GuidanceInstructions Author State Engineer of the State of Nevada Published State of Nevada, 072013 DOI Not Provided Check for...

159

Conference dates 1620 April 2012  

E-Print Network (OSTI)

Conference dates 16­20 April 2012 Location The Square Conference Centre Brussels, Belgium www/nanotechnologies Mark your Calendar #12;Conference dates 16­20 April 2012 The Square Conference Centre Brussels, Belgium success, Photonics Europe 2012 will again feature choice conferences and plenary presentations

Jahns, Jürgen

160

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington. The requirements in the 2009 Washington. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Ferry Pend Oreille Okanogan Stevens

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

skylights that will meet the requirements of the 2009 IECC for residential buildings as it relates to Texas. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements.

162

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

New Jersey. The New Jersey. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Bergen Hunterdon Mercer Morris

163

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Oregon. The requirements in the 2009 Oregon. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Baker Lake Benton Lane Clackamas Lincoln

164

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Minnesota. The Minnesota. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 7 Aitkin Grant Mahnomen Roseau

165

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Colorado. The Colorado. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 7 Clear Creek Lake Routt Grand Mineral San Juan

166

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Vermont. The requirements in the 2009 Vermont. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Addison Bennington Caledonia

167

2011Form EIA-902 Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

FORM EIA-902 ANNUAL GEOTHERMAL HEAT PUMP SHIPMENTS REPORT GENERAL INFORMATION AND INSTRUCTIONS I. Purpose Form EIA-902 is designed to provide the data necessary for the U.S. Energy Information Administration (EIA), a part of the U.S. Department of Energy (DOE), to carry out its responsibilities tracking heat pump shipments in the geothermal heat pump industry and reporting information concerning the size and status of the industry. The data collected will be published in the Renewable Energy Annual and also be available through EIA's Internet site at http://www.eia.gov/fuelrenewable.html. II. Who Should Respond to This Survey This report is mandatory and required pursuant to the authority granted to the Department of Energy (DOE) by the Federal Energy Information Administration Act of 1974 (Public Law 93-

168

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Kentucky. The requirements in the 2009 Kentucky. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 4 Adair Edmonson Knox Nicholas Allen Elliott Larue Ohio

169

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Iowa. The requirements in the 2009 IECC Iowa. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Allamakee Clay Hancock Palo Alto Black Hawk Clayton Hardin Plymouth

170

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Pennsylvania. The requirements in the Pennsylvania. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Cameron Elk Potter Tioga Clearfield McKean Susquehanna Wayne

171

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Alabama. The Alabama. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 3 Autauga Dallas Marengo Barbour De Kalb Marion

172

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

meet meet the requirements of the 2009 IECC for residential buildings as it relates to Alaska. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements.

173

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Wisconsin. The Wisconsin. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 7 Ashland Forest Price Bayfield Iron Sawyer

174

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

IECC for residential buildings as it relates to Virginia. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 4

175

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Oklahoma. The Oklahoma. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 4 Beaver Cimarron Texas IECC CLIMATE ZONE 3

176

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Rhode Island. The Rhode Island. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Bristol Kent Newport Providence

177

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Utah. The requirements Utah. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Box Elder Morgan Cache Rich Carbon Summit

178

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas. The requirements in the 2009 Kansas. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Cheyenne Hamilton Osborne Sherman

179

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

California. The California. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Alpine Mono IECC CLIMATE ZONE 5

180

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Georgia. The Georgia. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 4 Banks Fannin Habersham Rabun White

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Arkansas. The Arkansas. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 4 Baxter Fulton Newton Benton Izard Searcy

182

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Louisiana. The Louisiana. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 3 Bienville Franklin Red River Bossier Grant Richland

183

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Indiana. The Indiana. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Adams Franklin Madison St. Joseph

184

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Illinois. The Illinois. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Adams Edgar Lake Piatt Boone Ford Lee Pike

185

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Florida. The Florida. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 2 Alachua Hardee Orange Baker Hendry Osceola

186

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

South Dakota. The requirements in the South Dakota. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Aurora Faulk McPherson Beadle Grant Meade

187

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Ohio. The requirements Ohio. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Allen Fayette Lorain Preble Ashland Franklin Lucas Putnam

188

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Tennessee. The requirements in the 2009 Tennessee. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 4 Anderson Franklin Loudon Scott

189

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Mississippi. The Mississippi. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 3 Adams Itawamba Pike Alcorn Jasper Pontotoc

190

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Maine. The requirements in the 2009 Maine. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 7 Aroostook IECC CLIMATE ZONE 6 Androscoggin

191

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

New Mexico. The New Mexico. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Catron San Juan Colfax San Miguel

192

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Delaware. The Delaware. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 4 Kent New Castle Sussex

193

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

West Virginia. The requirements in the West Virginia. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Barbour Lewis Raleigh Brooke Marion Randolph

194

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

North Carolina. The North Carolina. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 5 Alleghany Avery Watauga

195

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Michigan. The Michigan. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 7 Baraga Houghton Luce Schoolcraft

196

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

New York. The New York. The requirements in the 2009 IECC are the same for windows used in new buildings, remodeling & additions to existing buildings, and as replacements of existing windows. Step-by-Step Instructions 1. Using the climate zone map or table, match the jurisdiction to the appropriate IECC climate zone. Use the "IECC Prescriptive Window Energy Efficiency Requirements" (on the back of this sheet) to determine the window performance requirements associated with the climate zone. 2. Construct the home with windows that have area weighted average U-factor and SHGC values less than or equal to the values for the climate zone and meet the code maximum air leakage requirements. IECC CLIMATE ZONE 6 Allegany Franklin Montgomery Sullivan

197

ENSC 461 PROJECT: Next generation air conditioning systems for vehicles Assigned date: Feb. 21, 2011 Due date: April 11, 2011  

E-Print Network (OSTI)

to significant power consumption of vapour-compression systems, finding a new "green" refrigerant is another vehicles (HEVs), as it is the second most energy consuming system after the electric motor. Further, HVAC air conditioning systems used in the automotive industry are based on vapour-compression refrigeration

Bahrami, Majid

198

DATE : NVLAP LAB CODE: NVLAP EFFICIENCY OF ELECTRIC MOTORS APPLICATION (REV. 2013-06-11) PAGE 1 OF 1  

E-Print Network (OSTI)

DATE : NVLAP LAB CODE: NVLAP EFFICIENCY OF ELECTRIC MOTORS APPLICATION (REV. 2013-06-11) PAGE 1 OF 1 EFFICIENCY OF ELECTRIC MOTORS TEST METHOD SELECTION LIST Instructions: Check each test method, Method B, on electric motors rated: ________ to ________ horsepower. ____ 24/M02* IEEE 114 Test Procedure

199

Generating and executing programs for a floating point single instruction multiple data instruction set architecture  

DOE Patents (OSTI)

Mechanisms for generating and executing programs for a floating point (FP) only single instruction multiple data (SIMD) instruction set architecture (ISA) are provided. A computer program product comprising a computer recordable medium having a computer readable program recorded thereon is provided. The computer readable program, when executed on a computing device, causes the computing device to receive one or more instructions and execute the one or more instructions using logic in an execution unit of the computing device. The logic implements a floating point (FP) only single instruction multiple data (SIMD) instruction set architecture (ISA), based on data stored in a vector register file of the computing device. The vector register file is configured to store both scalar and floating point values as vectors having a plurality of vector elements.

Gschwind, Michael K

2013-04-16T23:59:59.000Z

200

Instructional Psychology and Technology Andrew S. Gibbons, Chair  

E-Print Network (OSTI)

Instructional Psychology and Technology Andrew S. Gibbons, Chair 150 MCKB, (801) 422-5097 David O Programs and Degrees MS Instructional Psychology and Technology PhD Instructional Psychology and Technology For more information see the BYU 2007­2008 Graduate Catalog. Instructional Psychology and Technology (IP

Hart, Gus

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

202

EIA-782C Exclusionary list instructions  

U.S. Energy Information Administration (EIA) Indexed Site

C Exclusionary list instructions 1 C Exclusionary list instructions 1 August 2013 EIA-782C Exclusionary List Instructions The 2013 Exclusionary List has been updated for your use in preparing Form EIA-782C, "Monthly Report of Prime Supplier Sales of Petroleum Products Sold for Local Consumption." As required under the "General Instructions" for this form, respondents are to exclude sales to all companies and their subsidiaries represented on this Exclusionary List. The purpose of the EIA-782C survey is to measure sales of selected petroleum products in the states where they are consumed; that is, the survey attempts to estimate demand at the state level. In order to avoid double-counting, the survey has been designed so that respondents, consisting of "prime suppliers," report only sales to local distributors,

203

EIA-782A Exclusionary List Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

A Exclusionary list instructions 1 A Exclusionary list instructions 1 August 2013 EIA-782A Exclusionary List Instructions The 2013 Exclusionary List has been updated for your use in preparing Form EIA- 782A, "Refiners'/Gas Plant Operators' Monthly Petroleum Product Sales Report." As required under the "General Instructions" for this form, respondents are to exclude all sales to refiners and gas plant operators represented on the list. When using this list, please note the following: * Exclude all sales made to companies and their subsidiaries represented on this Exclusionary List, starting with reference month August 2013. * If sales are made to a company with a name substantially similar to one on this list, it may be assumed that the companies are related and those sales

204

Compilation techniques for short-vector instructions  

E-Print Network (OSTI)

Multimedia extensions are nearly ubiquitous in today's general-purpose processors. These extensions consist primarily of a set of short-vector instructions that apply the same opcode to a vector of operands. This design ...

Larsen, Samuel (Samuel Barton), 1975-

2006-01-01T23:59:59.000Z

205

Muscle Cells Provide Instructions for Planarian Regeneration  

E-Print Network (OSTI)

Regeneration requires both potential and instructions for tissue replacement. In planarians, pluripotent stem cells have the potential to produce all new tissue. The identities of the cells that provide regeneration ...

Witchley, Jessica N.

206

Completion processing for data communications instructions  

DOE Patents (OSTI)

Completion processing of data communications instructions in a distributed computing environment, including receiving, in an active messaging interface (`AMI`) data communications instructions, at least one instruction specifying a callback function; injecting into an injection FIFO buffer of a data communication adapter, an injection descriptor, each slot in the injection FIFO buffer having a corresponding slot in a pending callback list; listing in the pending callback list any callback function specified by an instruction, incrementing a pending callback counter for each listed callback function; transferring payload data as per each injection descriptor, incrementing a transfer counter upon completion of each transfer; determining from counter values whether the pending callback list presently includes callback functions whose data transfers have been completed; calling by the AMI any such callback functions from the pending callback list, decrementing the pending callback counter for each callback function called.

Blocksome, Michael A; Kumar, Sameer; Parker, Jeffrey J

2014-05-20T23:59:59.000Z

207

WEBVIEWER INSTRUCTION PACKET Facilities Planning and Scheduling  

E-Print Network (OSTI)

-mail: scheduling@mail.wvu.edu Website: http://facilitiesscheduling.wvu.edu http://webviewer.wvu.edu #12;2 WebViewer: Detailed Instructions Table of Contents Purpose of WebViewer.................................................................................................................................3 Tour of Web

Mohaghegh, Shahab

208

Some Observations on Competency Based Instruction  

E-Print Network (OSTI)

Abstract: This article summarizes the authors' observations derived over the course of 3 years of research and experimentation with competency based instruction. While the intent of this project has been the development of ...

Altman, Reuben; Meyen, Edward L.

1974-01-01T23:59:59.000Z

209

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Science Undergraduate Laboratory Internships (SULI) SULI Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. SULI Internship Term: Spring 2014 Summer 2014* Fall 2013 On-line Application Opens August 6, 2013 October 18, 2013 May 1, 2013 Applications Due October, 1, 2013 5:00 PM ET January 10, 2014 5:00 PM ET June 12, 2013 5:00 PM ET Offer Notification Period Begins on or around October, 15, 2013 January 20, 2014 June 24, 2013

210

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. VFP Term: Summer 2014 On-line Application Opens October 18, 2013 Applications Due January 10, 2014 5:00 PM ET* Offer Notification Period Begins January 20, 2014 All DOE Offers and Notifications Complete April 1, 2014 *A research proposal co-developed with a DOE laboratory researcher must be electronically submitted by all faculty applicants as part of their

211

EMPA Instructions for Geological Samples Modified after Johnson Lab Thin Film Instructions  

E-Print Network (OSTI)

EMPA Instructions for Geological Samples Modified after Johnson Lab Thin Film Instructions Carbon CONTROL window click the "Vacuum" tab. 4. Click the "Sample Exchange" button and then click "Yes" to confirm sample exchange. 5. In the SX CONTROL window it will give you a series of directions to follow: a

212

Form Instructions, 2013 Instructions for WiscAMP Small Grant Forms  

E-Print Network (OSTI)

1 Form Instructions, 2013 Instructions for WiscAMP Small Grant Forms (last revised January 2013 Foundation (NSF). Small grant Principal Investigators are required to arrange for the completion the WiscAMP small grants ("level one" students) and the faculty and staff involved in the programming

Sheridan, Jennifer

213

E-Print Network 3.0 - automating instructional design Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Automated Generation of Assembly Instructions Summary: for the creation and automation of visual instructions. Designing effective instructions for everyday products... of...

214

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

215

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

216

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

217

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

218

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

219

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

220

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

222

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

223

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

224

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

225

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

226

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

227

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

228

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

229

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

230

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

231

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

232

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

233

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

234

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

235

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

236

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

237

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

238

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

239

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

240

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

242

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

243

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

244

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

245

Date:  

Office of Legacy Management (LM)

1.45 10.06 0.99 0.04786 2.85 0.13 1.30 Froude Number Flow Type Notes Messages 0.66 Subcritical 0.64 Subcritical 0.41 Subcritical 0.58 Subcritical 0.48 Subcritical 0.42...

246

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

understand what is required to be a nuclear supplier. 6. Gen IV Fabrication Centric Roadmap The objective of this program is to develop a succinct document that will allow...

247

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

that Sandia contracts are settled for a reasonable amount and that no instances of fraud related to these contracts is apparent. We will not report on the adequacy of your...

248

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

2 E-2 IWFDP Volume 1 (Process Strategy) provides the basis for how the double-shell tanks (DST) will be used to stage and deliver waste feed to the WTP. This volume provides an...

249

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

of approximately 55 Mgal 1 of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The Hanford Federal Facility...

250

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The...

251

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

operations (such as preparation of chemical standards and sample analysis); and small-scale pilot projects (generally less than 2 years) frequently conducted to verify a...

252

DATE:  

Office of Legacy Management (LM)

(w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following...

253

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and repairing wastewater systems lines and connections that could impact the discharge to wastewater systems. 8. Drinking Water Contamination - Performing maintenance activities on...

254

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

Release; Further Dissemination Unlimited By Janis D. Aardal at 1:25 pm, Jan 31, 2013 DOERL-2001-41 Revision 6 SITEWIDE INSTITUTIONAL CONTROLS PLAN FOR HANFORD CERCLA RESPONSE...

255

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

buildings"..., and Overarching EC INL-05-002 "Critical Infrastructure Protection (CIP) Program ... Justification: Removal of the interior walls and mezzanines will be a...

256

DATE:  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Corporations Section 743 Any Payment for the Election for a Federal Office or to a Political Committee Section 3003 Reporting on Conference Spending 2 The FAL addresses the...

257

DATE:  

Energy Savers (EERE)

Corporations * Section 735 Any Payment for the Election for a Federal Office or to a Political Committee * Section 742 Reporting on Conference Spending The FAL addresses the...

258

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

of Impact: Generating and Managing Waste - The proposed activity would generate scrap metal and industrial waste. Project personnel will contact Waste Generator Services (WGS) to...

259

DATE:  

Energy Savers (EERE)

Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement...

260

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will rest on a new concrete foundation and house the necessary heating, ventilation and air conditioning (HVAC), electrical, life safety and communications systems but will not...

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233Th-232 contaminated materials (minor...

262

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Appropriations Act, 2014, Pub. L. No. 113-76. SUMMARY: Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 provides implementing...

263

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Building The INL must operate and maintain infrastructure and facilities to support the nuclear energy research, development, demonstration, and commercial application programs,...

264

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

es...A-i Appendix B Estimation of Selected Single-Shell Tank Heat Generation Rates...B-i RPP-RPT-54981, Revision 0 ii List of...

265

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing...

266

DATE:  

Office of Environmental Management (EM)

has been revised. The subject form has been posted on the DOE Financial Assistance web page on the Recipients Page under the Financial Assistance Forms and Information for...

267

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

A. Project Title: Innovative Manufacturing Process for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing...

268

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

269

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

270

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

271

2014 Training Dates & Cities 9-Tampa/Seffner 14-Cocoa  

E-Print Network (OSTI)

2014 Training Dates & Cities July 9-Tampa/Seffner 14-Cocoa 15­ Kissimmee 23­ Panama City 24­ Live. Write check or money order to: University of Florida **Payment is due with registration. Sorry, fees, a "No Show" does not merit a refund

Florida, University of

272

MA 22400: Online Homework Instructions  

E-Print Network (OSTI)

Friday, January 20, and is due by 7:00 pm on Monday, January 23. .... (Sorry, there is currently no way to keep it off the screen.) ... in; my browser keeps locking up; the answer box does not appear, it says to enter an answer, but I already have ...

odavis

2012-01-16T23:59:59.000Z

273

Radiokrypton dating finally takes off  

Science Journals Connector (OSTI)

...dating, based on the well-known radioactive decay...essentially has a single, well-mixed, and steady source, the...fortunately it works well for noble gases...Isolation Pilot Plant, New Mexico . J Contam Hydrol 160...radionuclides in Yellowstone geothermal gas emissions: A reconnaissance...

Werner Aeschbach-Hertig

2014-01-01T23:59:59.000Z

274

Experience with pipelined multiple instruction streams  

SciTech Connect

The authors introduces the architecture and programming environment of the heterogeneous element processor (HEP) and surveys a range of scientific applications programs for which parallel versions have been produced, tested, and analyzed on this computer. In all cases, the ideal of one instruction completion every pipeline step time is closely approached. Speed limitations in the parallel programs are more often a result of the extra code necessary to ensure synchronization than of actual synchronization lockout at execution time. The pipelined multiple instruction stream architecture is shown to cover a wide range of applications with good utilization of the parallel hardware. 35 references.

Jordan, H.F.

1984-01-01T23:59:59.000Z

275

Handling debugger breakpoints in a shared instruction system  

DOE Patents (OSTI)

A debugger debugs processes that execute shared instructions so that a breakpoint set for one process will not cause a breakpoint to occur in the other processes. A breakpoint is set by recording the original instruction at the desired location and writing a trap instruction to the shared instructions at that location. When a process encounters the breakpoint, the process passes control to the debugger for breakpoint processing if the breakpoint was set at that location for that process. If the trap was not set at that location for that process, the cacheline containing the trap is copied to a small scratchpad memory, and the virtual memory mappings are changed to translate the virtual address of the cacheline to the scratchpad. The original instruction is then written to replace the trap instruction in the scratchpad, so that process can execute the instructions in the scatchpad thereby avoiding the trap instruction.

Gooding, Thomas Michael; Shok, Richard Michael

2014-01-21T23:59:59.000Z

276

FORMS AND INSTRUCTIONS FOR PUBLICLY-OWNED UTILITIES  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION FORMS AND INSTRUCTIONS FOR PUBLICLY-OWNED UTILITIES SUBMITTING RETAIL as a Commission Report, and selected publicly-owned electric utilities will be required to provide the specified for Publicly-Owned Utility Forms........................................................... 11 Instructions

277

EECE 577 Assignment 2 Due date: October 20, at the beginning of class.  

E-Print Network (OSTI)

investigated for use in low-cost, thin-film solar cells (see, for example, Nanosolar's web-site). CIGS can be p on the course web-site in the file Spectrum.txt. The wavelength is in column 1 and the irradiance is in column 3. Perform a calculation of the dark current for the cell, justifying the equations and para- meter values

Pulfrey, David L.

278

Playing chicken (Gallus gallus ): methodological inconsistencies of molecular divergence date estimates due to secondary calibration points  

E-Print Network (OSTI)

one molecular dataset on the basis of a primary external calibration point, and which are used again independently of the original external calibration point on a second dataset. Unless particular care times among phyla and kingdoms based on multiple nuclear protein-coding genes, and show that they fail

Graur, Dan

279

CS 226 Computability Theory { Coursework Assignment 1 Due date: 12 March 2002  

E-Print Network (OSTI)

: A ! B be a function. De#12;ne g : P(A) ! P(B) by g(X) := f [X] := ff(a) j a 2 Xg for every X #18; A. Prove that f is injective if and only if g is injective. [5 marks] Question 2. Prove that #6; i#20;n 1 + 4i = 2n 2 + 3n + 1 for all n 2 N. [4 marks] Question 3. Prove or disprove the following statements

Berger, Ulrich

280

RFQ NUMBER 377 December 3, 2010 Due date for submission of Quotation 31/12/2010.  

E-Print Network (OSTI)

the reactive sample purge gas as well materials evolved by the sample. * Temperature Accuracy : ± 1 º. 11.The Institute reserves the right to reject any or all of the tenders received without assigning any reason. It also reserves the right to accept an offer other than the lowest. 12.The final order

Udgaonkar, Jayant B.

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

RFQ NUMBER: 375 January 16, 2012 Due date for submission of Quotation: 24/01/2012.  

E-Print Network (OSTI)

CONTROLLED (RS232) SEPARATE POWER SUPPLY IDEAL FOR SYSTEM INTEGRATION WATER COOLING OPTION INTEGRATED LONG 110/MON, MONITOR UNIT - DCC 110 CURRENT CONTROL MODULE 100mA OR 500mA) - DTC 110 TEMPERATURE CONTROL Research Institute invites Sealed Tenders for supply of Diode Laser Systems and their accessories directly

Udgaonkar, Jayant B.

282

RFQ NUMBER: 476 March 28, 2012 Due date for submission of Quotation: 13/04/2012.  

E-Print Network (OSTI)

consumption Typ. control electronics comprising of: a) DCC 110 19" supply rack with monitor unit and LCD display b) DTC 110: Temperature control module c) DCC 110: Low noise current control Institute invites Sealed Tenders for supply of the following directly from manufacturers or their authorized

Udgaonkar, Jayant B.

283

RFQ NUMBER : 397 December 23, 2010 Due date for submission of Quotation 20/01/2011.  

E-Print Network (OSTI)

CELL AND POWER METER 10. TEMPERATURE CONTROL. #12;11. BANDPASS FILTER 400nm, 600nm, 800nm Research Institute invites Sealed Tenders for supply of CLASS AAA SOLAR SIMULATOR directly from. AIR MASS 1.5 GLOBAL, light output control, power read-out, auto timer and all other standard features

Udgaonkar, Jayant B.

284

RFQ NUMBER: 442 January 21, 2011 Due date for submission of Quotation: 21/02/2011.  

E-Print Network (OSTI)

(FESEM) with Cryo facility, Energy Dispersive X-Ray Spectrometer (EDS) and STEM attachments directly from Specifications for Field-Emission Scanning Electron Microscope (FESEM) with Cryo facility, Energy Dispersive X chamber with 8 accessory ports including EDS ports. 10. Chamber design should have easy sample positioning

Udgaonkar, Jayant B.

285

Microsoft Word - EIA-176 Instructions-Jan2013Update.docx  

U.S. Energy Information Administration (EIA) Indexed Site

U.S. DEPARTMENT OF ENERGY Form Approved ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0175 Washington, DC 20585 Expiration Date: 02/28/2015 ANNUAL REPORT OF NATURAL AND SUPPLEMENTAL GAS SUPPLY AND DISPOSITION FORM EIA-176 INSTRUCTIONS PURPOSE The Energy Information Administration (EIA) Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," is designed to collect data on natural, synthetic, and other supplemental gas supplies, disposition, and certain revenues by State. The data appear in the EIA publications, Monthly Energy Review, Natural Gas Annual, and Natural Gas Monthly. REPORTING REQUIREMENT Report must be completed by: (1) Interstate natural gas pipeline companies, (2) Intrastate natural gas pipeline companies,

286

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

287

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

288

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

289

Instructional Technology Services Jim Snell, D.V.M.  

E-Print Network (OSTI)

Instructional Technology Services Jim Snell, D.V.M. ­Director, Instructional Technology Services 2012 New Faculty Orientation #12;Instructional Technology Services #12;Empowering Innovative Education ­ customized · Professional Certification in Online Teaching · Teaching & Technology Newsletter · 8th Annual

Boas, Harold P.

290

COMPARING TRADITIONAL MATH INSTRUCTION TO ONLINE INSTRUCTION: PREPARING STUDENTS FOR THE KANSAS COLLEGE AND CAREER READY STANDARDS  

E-Print Network (OSTI)

assessments have not helped prepare students. Differentiated instruction may be necessary to help learners achieve greater gains in math. This study focused on two fifth grade classrooms. Students in the control class received traditional math instruction...

Argubright, Matthew Thomas

2014-05-31T23:59:59.000Z

291

Automated Fuel Dispensing System Form Instructions  

E-Print Network (OSTI)

Automated Fuel Dispensing System Form Instructions If additional forms are necessary to provide(s) are hired and will be obtaining fuel, an Add Driver Form MUST be submitted for entry into the web database and/or diesel fuel to operate. Note: When a new vehicle, golf cart (gasoline), etc., is placed

Fernandez, Eduardo

292

Instructions for the Money In Money Out  

E-Print Network (OSTI)

Instructions for the Money In Money Out Worksheet #12;Decisions, Decisions, Decisions We all make decisions about how we use our money #12;Money in, money out worksheet: A tool for managing your finances. #12;Decisions, Decisions, Decisions Money In Money Out Sheet ...... Track weekly income, expenses

New Hampshire, University of

293

Instructions for use JICA's Assistance in Health  

E-Print Network (OSTI)

and clinical care eg, strengthen health systems including the development of human resources, facilitiesInstructions for use #12;1 JICA's Assistance in Health Ryuji MATSUNAGA International Cooperation's Assistance in Health Example of JICA Programme/Projects 2 #12;An Overview of Japan's ODA 3 #12;Japan's ODA

Tsunogai, Urumu

294

JBuilder Startup Instructions Creating a Project  

E-Print Network (OSTI)

the Generate project notes file option box. Click Next to display Project Wizard Step 2 of 3. 3. Type cJBuilder Startup Instructions Creating a Project 1. Choose File, New Project to bring up will see the No Such Directory dialog box. Click Yes to return to Project Wizard - Step 2 of 3. 4. Click

Liang, Y. Daniel

295

APPLICATION INSTRUCTIONS FOR THE UNIVERSITY COLLEGE UTRECHT  

E-Print Network (OSTI)

APPLICATION INSTRUCTIONS FOR THE UNIVERSITY COLLEGE UTRECHT EXCHANGE PROGRAM 1. Review the General in to Binghamton's Office of International Programs. Do not send anything directly to University College Utrecht and there is time to make the arrangements at the University of Utrecht. There is a $25 late application fee. Once

Suzuki, Masatsugu

296

Microsoft Word - ShippingInstructionsRev3.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

7/8/2013 Rev3 7/8/2013 Rev3 BROOKHAVEN SCIENCE ASSOCIATES, LLC SHIPPING AND LABELING INSTRUCTIONS FOR ALL DELIVERIES TO BROOKHAVEN NATIONAL LABORATORY 1. Delivery Location Unless otherwise noted on the Purchase Order/Contract, all deliveries shall be addressed to 98 Rochester Street, Upton, New York 11973. 2. Delivery Hours All deliveries must arrive at Brookhaven National Laboratory (BNL)between the hours of 8:00 am and 11:30 am or from 12:30 pm to 4:00 pm EST, Monday through Friday. Exceptions must contact the Traffic Office (see contact information below). 3. Special Notification of Delivery Due to weight, size, and/or volume parameters of the end item(s) requiring special material handling/rigging by BSA personnel; advanced notice of delivery of 3 business days minimum

297

Request for Proposals for the Hulka Energy Research Fellowship Announcement Date: February 10, 2014  

E-Print Network (OSTI)

processes, · renewable wind energy, · ocean thermal or wave energy or geothermal energy conversionRequest for Proposals for the Hulka Energy Research Fellowship Announcement Date: February 10, 2014 Proposal Due Date: March 12, 2014 Since 2008, Ms. Barbara Hulka has the Hulka Energy Research Fellowship

Rubloff, Gary W.

298

The survey of social studies and geography instruction in Texas elementary schools  

E-Print Network (OSTI)

instruction. Two main research questions drive this study: 1. What is the amount of time devoted to teaching social studies and geography in Texas elementary schools? (for the purposes of this study, elementary is defined as Kindergarten through Fourth.... For example, informal reports from district surveys in California and Montana showed that 70 percent of kindergarten through Fourth Grade teachers were doing "little or nothing with social studies" due to the "back-to-basics" movement popular at that time...

Konvicka, Michael Ray

2001-01-01T23:59:59.000Z

299

Revised 01/13 Retirement Application Instructions  

E-Print Network (OSTI)

of the following documents: birth certificate, delayed birth certificate, baptismal certificate, passport members only need to complete page 1 of the application. Verification of Date of Birth Verification of the member's date of birth must accompany the retirement application. This verification may be a copy of one

New Mexico, University of

300

Instructions for WebVPN Connectivity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Instructions for WebVPN Connectivity Instructions for WebVPN Connectivity November 2013 Requirements * Web Browser (Internet Explorer, Firefox, Safari, Internet Explorer, etc.) * Internet Connection (Preferably Broadband) * RSA Token or HSPD12 Smart Card Background The clientless WebVPN connectivity option being offered by the OCIO significantly enhances the speed as well as the interoperability between different operating systems/Internet service providers (ISP) which results in an improved overall user experience when using VPN services to access corporate applications remotely. WebVPN allows a remote user to access Outlook Web Access, Citrix Workplace Environment (CWE), and other web-based applications from any computer with an Internet connection, with no requirement for additional software to be downloaded and installed to the remote machine.

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Laboratory Shuttle Bus Routes: Instructions for Bicyclists  

NLE Websites -- All DOE Office Websites (Extended Search)

Instructions for Bicyclists Instructions for Bicyclists Front bike rack image Rear bike rack image Front bike rack Rear bike rack Bicyclists are required to wear helmets while riding at the Berkeley Lab. LBNL buses are equipped with bicycle racks in the front and rear of the bus. Use bicycle rack at your own risk. Berkeley Lab does not assume liability for damage to your bicycle. If you experience difficulties, or notice the bicycle rack is not working properly, please notify the bus operator and/or contact the bus supervisor at 486-4165 or email busservices@lbl.gov and/or post your comments with specific information on the Operations Suggestion box. Loading a bicycle on the bus: Prepare your bicycle for loading by: removing water bottles, pumps and other loose items that could fall off while the bus is in motion.

302

Classified Reading Room Instructions/Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Classified Reading Room Instructions/Guidelines Classified Reading Room Instructions/Guidelines * Reading Room Points of Contact: Milesha Grier, (202) 586-8210, milesha.gier@nnsa.doe.gov Reading Room Location: DOE Forrestal Building, 1000 Independence Ave., Washington, D.C. Room 4A-045, 4 th Floor, "A" Corridor, Behind Glass Doors, dial 6-8210 Reading Room Availability: By Appointment - Reading Room will be available until RFP Closes except (12/5/11 thru 12/16/11, December 23, January 2, 2012 and January 16, 2012). Reading Room Hours: Morning, 9:00 a.m. - 11:30 a.m.; and Afternoon 1:00 p.m. - 3:30 p.m. Reading Room Will Accommodate: Up to 5-6 people * All personnel must: a. submit a formal Intent to Bid IAW Section L of the RFP, via email to: SEB1@doeal.gov

303

Laboratory Shuttle Bus Routes: Instructions for Riders  

NLE Websites -- All DOE Office Websites (Extended Search)

Instructions for Riders Instructions for Riders Shuttle stops are marked with this sign: Bus sign image Tips for riders: When you see a shuttle bus approaching WAVE AT THE DRIVER so the driver knows you want to board the bus For safety reasons, shuttle bus drivers can only pick-up and drop-off passengers at designated stops. Shuttle services are for Berkeley Lab employee and guest use only. All riders are required to show ID when boarding off-site buses. Acceptable ID's are: LBNL badge, UC Berkeley student and faculty ID badge, DOE badge, or UCOP badge. Guests are required to present a visitor bus pass, email, or permission from Lab host, written on official letterhead. See Site Access for more information. As you board, tell the driver the building number of your destination. The driver will be able to assist you with directions.

304

Experience with pipelined multiple instruction streams  

SciTech Connect

Pipelining has been used to implement efficient, high-speed vector computers. It is also an effective method for implementing multiprocessors. The Heterogeneous Element Processor (HEP) built by Denelcor Incorporated is the first commercially available computer system to use pipelining to implement multiple processes. This paper introduces the architecture and programming environment of the HEP and surveys a range of scientific applications programs for which parallel versions have been produced, tested, and analyzed on this computer. In all cases, the ideal of one instruction completion every pipeline step time is closely approached. Speed limitations in the parallel programs are more often a result of the extra code necessary to ensure synchronization than of actual synchronization lockout at execution time. The pipelined multiple instruction stream architecture is shown to cover a wide range of applications with good utilization of the parallel hardware.

Jordon, H.F.

1984-01-01T23:59:59.000Z

305

File:Ger geothermal form 1 instructions.pdf | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search File Edit History Facebook icon Twitter icon » File:Ger geothermal form 1 instructions.pdf Jump to: navigation, search File File history File usage Metadata File:Ger geothermal form 1 instructions.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 50 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:14, 31 October 2013 Thumbnail for version as of 10:14, 31 October 2013 1,275 × 1,650, 2 pages (50 KB) Abergfel (Talk | contribs)

306

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

307

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

308

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

2010 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 #N/A Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

309

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

#N/A #N/A 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

310

HIS: an instruction issue mechanism for hyperscalar processors  

E-Print Network (OSTI)

11 12 14 15 17 19 19 20 20 20 21 21 22 22 23 III DYNAMIC INSTRUCTION SCHEDULING MECHANISMS . 24 A B C D Static versus dynamic code scheduling Tomasulo's algorithm . The dispatch stack scheme . Comparison of the two approaches... VITA . 101 LIST OF TABLES TABLE Page I Performance Advantage of Major Hardware Features [16] 23 II Example Instruction Sequence . 30 HI Instruction Sequence in the Dispatch Stack IV The Updated Dispatch Stack V Functional Unit Latencies 33 61...

Kuttanna, Belliappa

1993-01-01T23:59:59.000Z

311

Instruction Guide Updated March 25, 2013 -Page 1  

E-Print Network (OSTI)

-Ups in Browser instruction guide. Navigating 1. Login to my.ufl.edu using your GatorLink ID and password. 2

Roy, Subrata

312

Federal Assistance Reporting Checklist and Instructions for Projects...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Projects Federal Assistance Reporting Checklist and Instructions for Projects DOE F 4600.2 FA RepReqChklst FINAL 10-2014.docx...

313

Federal Assistance Reporting Checklist and Instructions for RD...  

Office of Environmental Management (EM)

Federal Assistance Reporting Checklist and Instructions for RD&D Projects DOE F 4600.2, Financial Assistance Reporting Checklist for RD and D Attachment 1, Research...

314

DOE Supplemental Instructions for OMB Section 1512 Reporting...  

Energy Savers (EERE)

Section 1512 Reporting - For Grant and Loan Recipients More Documents & Publications DOE Supplemental Instructions for OMB Section 1512 Reporting - For Contractors Slide 1 Slide 1...

315

Montana - Instructions for Application for Utilities Across State...  

Open Energy Info (EERE)

Application for Utilities Across State Trust Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Instructions for Application for Utilities...

316

BeamLine Operations and Safety Awareness (BLOSA) Checklist Beamline X8A All users must be instructed in operating the beamline safely. Leave checkbox blank if not applicable. Training valid 2 years. Visitors use Visitor/Escort forms.  

E-Print Network (OSTI)

BeamLine Operations and Safety Awareness (BLOSA) Checklist Beamline X8A All users must procedure for removal of solder wasteSolder B CLOSE OUT Secure the beamline and disable shutter/beam before for this beamline:I understand the instructions given to me on beamline operations and safety awareness. Date UAdm

Ohta, Shigemi

317

2011 Form EIA-63B Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

U. S. DEPARTMENT OF ENERGY Form Approved U.S. ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0196 Washington, DC 20585 Expires: 12/31/2013 FORM EIA-63B ANNUAL PHOTOVOLTAIC CELL/MODULE SHIPMENTS REPORT GENERAL INFORMATION AND INSTRUCTIONS I. Purpose Form EIA-63B is designed to provide the data necessary for the U.S. Energy Information Administration (EIA), a part of the U.S. Department of Energy (DOE), to carry out its responsibilities tracking photovoltaic cell/module shipments in the photovoltaic industry and

318

Poster Instructions for Ag-ESD Symposium 2011 Poster Abstract  

E-Print Network (OSTI)

Poster Instructions for Ag-ESD Symposium 2011 Poster Abstract Please follow these instructions for preparation of a one page abstract of your poster presentation. 1. Language English Only 2. Abstract format. #12;Poster Format, Display and Example 1. Language English only 2. Size We recommend you prepare an A0

Tanaka, Jiro

319

Poster Instructions for Ag-ESD Symposium 2012 Poster Abstract  

E-Print Network (OSTI)

Poster Instructions for Ag-ESD Symposium 2012 Poster Abstract Please follow these instructions for preparation of a one page abstract of your poster presentation. 1. Language English Only 2. Abstract format send "Poster Abstract" in Word file format by E-mail to agesd@nourin.tsukuba.ac.jp (Do not send "pdf

Ejiri, Shinji

320

FORMS AND INSTRUCTIONS FOR PUBLICLY-OWNED UTILITIES  

E-Print Network (OSTI)

included in their natural gas fuel-price forecast and their use of rate stabilization funds. This report ELECTRICITY PRICE DATA In support of the 2007 Integrated Energy Policy Report COMMISSIONREPORT March 2007 CEC INSTRUCTIONS FOR RETAIL PRICE FORECASTING FORMS...... 8 INSTRUCTIONS FOR FORM 1.A (POU

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Patchable Instruction ROM Architecture Timothy Sherwood Brad Calder  

E-Print Network (OSTI)

Patchable Instruction ROM Architecture Timothy Sherwood Brad Calder Department of Computer Science times. The two current design options for instruction storage, ROM and Flash, are each highly optimized to one of these two goals but provide little com- promise between them. ROM is used for highly area opti

Sair, Suleyman

322

Absolute Time Radiometric Dating: the source  

E-Print Network (OSTI)

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale #12 as an element changes to another element, e.g. uranium to lead. · The parent element is radioactive · Carbon-14, C14 Nitrogen-14, N14 · Uranium-235, U235 Lead-207, Pb207 · Potassium-40, K40 Argon-40, Ar40

Kammer, Thomas

323

Vehicle arrived for disposal Date Disposal of Asset form approved (copy required) Date  

E-Print Network (OSTI)

Colour Engine (ltrs) Fuel (ulp/diesel) Transmission (auto/manual) Compliance date Kilometres Additions-BusinessSolutions@anu.edu.au Post auction report from Pickles received. Date (ie Sold at General Auction, passed-in etc) Cheque

Botea, Adi

324

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

325

INSTRUCTION CONCERNING PRENATAL RADIATION EXPOSURE A. INTRODUCTION  

E-Print Network (OSTI)

/fetus exposed to radiation, a dose limit for the embryo/fetus, and suggestions for reducing radiation exposure and the Radiation Control Officer in writing that she is pregnant and the estimated date of conception.311, FAC, places different radiation dose limits on declared pregnant workers than on adult workers

Slatton, Clint

326

Electronic Form W2 Instructions (rev 12/26/2011) Page 1 Electronic Form W-2 Instructions  

E-Print Network (OSTI)

Electronic Form W2 Instructions (rev 12/26/2011) Page 1 Electronic Form W-2 Instructions to receive all future Forms W-2 in electronic format only and forego the paper copy after you have reviewed on "Electronic W-2 Consent" 5. Read the notice at the top of the Consent page. 6. Check the box next to "Consent

Dyer, Bill

327

2011 Form EIA-63A Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

U. S. DEPARTMENT OF ENERGY U. S. DEPARTMENT OF ENERGY Form Approved U.S. ENERGY INFORMATION ADMINISTRATION OMB No. 1905-0196 Washington, DC 20585 Expires: 12/31/2013 FORM EIA-63A ANNUAL SOLAR THERMAL COLLECTOR/REFLECTOR SHIPMENTS REPORT GENERAL INFORMATION AND INSTRUCTIONS I. Purpose Form EIA-63A is designed to provide the data necessary for the U.S. Energy Information Administration (EIA), a part of the U.S. Department of Energy (DOE), to carry out its responsibilities tracking collector/reflector shipments in the solar thermal industry and reporting information concerning the size and status of the industry. The data collected will be published in the Renewable Energy Annual and also be available through EIA's Internet site at http://www.eia.gov/fuelrenewable.html.

328

Fermilab Leadership Institute Integrating Internet, Instruction and  

NLE Websites -- All DOE Office Websites (Extended Search)

Fermilab Leadership Institute Integrating Fermilab Leadership Institute Integrating Internet, Instruction and Curriculum Online Materials Projects ACT Program Information Example ACT Class Page Example LInC Class Page Please sign up here to be notified of future LInC program opportunities. Fermilab LInC Online is creating a cadre of educational leaders who effectively integrate technology in their classrooms to support engaged learning student investigations on real-world issues. Participants range from classroom teachers and technology coordinators through library media specialists, who create engaged learning projects that incorporate the best uses of technology. The new Fermilab LInC ACT course guides teachers through the process of evaluating, selecting and customizing an inquiry-based online project to

329

An Analysis of Department of Defense Instruction 8500.2 'Information Assurance (IA) Implementation.'  

SciTech Connect

The Department of Defense (DoD) provides its standard for information assurance in its Instruction 8500.2, dated February 6, 2003. This Instruction lists 157 'IA Controls' for nine 'baseline IA levels.' Aside from distinguishing IA Controls that call for elevated levels of 'robustness' and grouping the IA Controls into eight 'subject areas' 8500.2 does not examine the nature of this set of controls, determining, for example, which controls do not vary in robustness, how this set of controls compares with other such sets, or even which controls are required for all nine baseline IA levels. This report analyzes (1) the IA Controls, (2) the subject areas, and (3) the Baseline IA levels. For example, this report notes that there are only 109 core IA Controls (which this report refers to as 'ICGs'), that 43 of these core IA Controls apply without variation to all nine baseline IA levels and that an additional 31 apply with variations. This report maps the IA Controls of 8500.2 to the controls in NIST 800-53 and ITGI's CoBIT. The result of this analysis and mapping, as shown in this report, serves as a companion to 8500.2. (An electronic spreadsheet accompanies this report.)

Campbell, Philip LaRoche

2012-01-01T23:59:59.000Z

330

Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite)  

U.S. Energy Information Administration (EIA) Indexed Site

Report Period: Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite) Secure File Transfer option available at: (e.g., PO Box, RR) Electronic Transmission: The PC Electronic Data Reporting Option (PEDRO) is available. Zip Code: - If interested in software, call (202) 586-9659. Email form to: Fax form to: (202) 586-9772 - - Mail form to: Oil & Gas Survey - - U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 OOG.SURVEYS@eia.doe.gov Contact Name: Version No.: 2013.01 Date of this Report: Mo Day State: Year Phone No.: DOMESTIC CRUDE OIL FIRST PURCHASE REPORT Company Name: A completed form must be filed by the 30th calendar day following the end of the report

331

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

332

Winter Study Rebate Form 2012 Date______________________________ ID #________________________________  

E-Print Network (OSTI)

Winter Study Rebate Form 2012 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

333

Winter Study Rebate Form 2013 Date______________________________ ID #________________________________  

E-Print Network (OSTI)

Winter Study Rebate Form 2013 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

334

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

335

SAVE THE DATE!!! The Silicon Valley  

E-Print Network (OSTI)

SAVE THE DATE!!! The Silicon Valley 3rd Annual Social Innovation Leadership Forum 2014 (SILF 2014 towards a better tomorrow... Register for the event today! The Social Innovation Leadership Forum (SILF

Su, Xiao

336

Property:GEAReportDate | Open Energy Information  

Open Energy Info (EERE)

Pages using the property "GEAReportDate" Showing 1 page using this property. L Los Humeros III Geothermal Power Plant + 19 December 2013 + Retrieved from "http:en.openei.org...

337

Version Date: July 2012 COPYRIGHT & TRADEMARKS  

E-Print Network (OSTI)

WEB Clock Version Date: July 2012 #12;COPYRIGHT & TRADEMARKS Copyright © 1998, 2011, Oracle and Guide WEB Clock Page iii Table of Contents WEB Clock ........................................................................................................................ 1 WEB Clock Procedure

338

NO. REV. NO. Systems Division DATE  

E-Print Network (OSTI)

-~ NO. REV. NO. EATM-15 PAGE OF ~ Systems Division DATE EASEP /PSEP Solar Panel Development Design+"'--.:L'_;;;J....;::::::..··-=·~::!!:!!!e::...._ K. Hsi #12;NO. REV. NO. EATM-15 EASEP/PSEP Solar Panel Development ~ Systems Division Design of the EASE-PSEP Solar Panel Array~PA::G:,:E:..::=l=~o:F~=2=7= DATE 20 Nov. 1968 1. 0 SUMMARY Electrical power

Rathbun, Julie A.

339

Training Room Equipment Instructions Projector and TV Display  

E-Print Network (OSTI)

Training Room Equipment Instructions Projector and TV Display The control panel on the wall are connected to a training room computer and room is equipped with a keyboard, mouse and clicker. Connect USB

Crawford, T. Daniel

340

Form 1410 FR.14 Instructions Internal Service Providers: Rate Calculation  

E-Print Network (OSTI)

expenses, including expenditure types. Annualize the #12;Form 1410 FR.14 Instructions ISP Rate Calculation it exceeds 60 days of operating capital) or unplanned federal deficit into (B4). This amount will populate, by expenditure type, of t

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

SAFETY AND THE Office of Environmental Health and Instructional Safety  

E-Print Network (OSTI)

SAFETY AND THE SUPERVISOR Office of Environmental Health and Instructional Safety #12;Safety to University safety, health, and environmental compliance strategies. Every employee is entitled to a safe standard practices, and administering your overall safety, health, and environmental responsibilities

de Lijser, Peter

342

RCRA Hazardous Waste Part A Permit Application: Instructions...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit Application: Instructions and Form (EPA Form 8700-23) Abstract This...

343

Courseware and behavioral instruction: The design and dissemination of effective  

E-Print Network (OSTI)

Comments on P. R. Chase's (1985) suggestions in an earlier edition of the present journal with regard to the integration of behavioral instruction techniques with advanced authoring programs to design complex computerized ...

Ober, B. Robert; Trainor, Timothy N.; Semb, George B.

1985-01-01T23:59:59.000Z

344

Comparative Analysis of Second Language Instruction and Motivation  

E-Print Network (OSTI)

school second language instruction in Buenos Aires, Argentina and College Station, Texas. The purpose of this study is to explain theoretical and motivational pedagogical strategies, as well as to understand the differences in motivation and how...

Speights, Lara A.

2010-07-14T23:59:59.000Z

345

An instruction issue mechanism for superscalar processors supporting multiple threads  

E-Print Network (OSTI)

An instruction issue mechanism for superscalar processors supporting multiple threads is presented. This mechanism offers the advantages of two of the most popular dynamic scheduling mechanisms: Tomasulo's algorithm and the Dispatch Stack scheme...

Kumar, Salil

1994-01-01T23:59:59.000Z

346

Instructions for WebVPN Connectivity | Department of Energy  

Office of Environmental Management (EM)

Instructions for WebVPN Connectivity WebVPN allows a remote user to access Outlook Web Access, Citrix Workplace Environment (CWE), and other web-based applications from any...

347

Web Based Operation Instruction System Using Wearable Computer  

Science Journals Connector (OSTI)

In our research, the Web-based Instruction System using the wearable computer is developed. The system consists of a wearable computer, a wireless communication system and web-applications. Web-applications ar...

Yoshiro Fukuda; Takao Kurahashi…

2005-01-01T23:59:59.000Z

348

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

349

2014 NEJC Save the Date (Spanish) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 NEJC Save the Date (Spanish) 2014 NEJC Save the Date (Spanish) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

350

2014 NEJC Save the Date (English) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 NEJC Save the Date (English) 2014 NEJC Save the Date (English) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

351

Presentations by Date | Merit Review Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

352

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

353

COS NUV TA1 Mirror Specification Date: December 8, 1999  

E-Print Network (OSTI)

Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling:........................................................................................ 3 3.4.3 Solvents

Colorado at Boulder, University of

354

COS NUV Grating Substrate Specification Date: August 20, 2001  

E-Print Network (OSTI)

Experiment Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling: ............................................................................................3 3.4.3 Solvents.........................................................................................................

Colorado at Boulder, University of

355

COS Coating Reflectivity Specification Date: August 2, 1999  

E-Print Network (OSTI)

Project Scientist, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center .................................................................................. 4 4.1.1 Solvents

Colorado at Boulder, University of

356

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

357

Computational Age Dating of Special Nuclear Materials  

SciTech Connect

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

358

Queen's University Environmental Health & Safety Date Issued  

E-Print Network (OSTI)

Queen's University Environmental Health & Safety Date Issued: November 27, 2013 Page No.: 1: The Department of Environmental Health & Safety 1.0 Introduction Queen's University acknowledges that the use of the Aboriginal culture and heritage. This standard operating procedure outlines the University's guidelines

Graham, Nick

359

Proposed Start Date: Title of Project  

E-Print Network (OSTI)

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

360

CURRICULUM VITAE DATE PREPARED: September 5, 2007  

E-Print Network (OSTI)

CURRICULUM VITAE DATE PREPARED: September 5, 2007 PART I: General Information Education 2000- Organization for Human Brain Mapping (OHBM), Member HMS Curriculum Vitae Page 1 of 14 #12;2005- Society for Neuroscience (SFN), Member HMS Curriculum Vitae Page 2 of 14 #12;Part II: Research, Teaching

Boas, David

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Photo Contest Closing date 2013 9 19  

E-Print Network (OSTI)

2013 About Photo Contest Closing date 2013 9 19 Photo Contest Eligibility International) (8MB ) By E-Mail (Maximum size 8MB per photo, up to 2 photos) kisc-koryu@edu.kobe-u.ac.jp 2) CD-R () By Post or submit by hand to KISC Photos (up to 2 photos) burned on a CD-R. Note that your data

Banbara, Mutsunori

362

SAVE THE DATE! Saskatchewan Epidemiology Association  

E-Print Network (OSTI)

SAVE THE DATE! Saskatchewan Epidemiology Association Annual Fall Symposium & Workshop November 9 look forward to presentations by: Saskatchewan's Chief Medical Health Officer, Dr. Moira Mc of Regina ­ expert in climate change on the prairies Saskatchewan-based veterinarian ­ name to be announced

Saskatchewan, University of

363

Date ______________________ New York City Fire Department  

E-Print Network (OSTI)

familiar with the fire protection and fire suppression systems in the premises where heDate ______________________ New York City Fire Department Bureau of Fire Prevention 9 Metro received training in 3RCNY §10-01, Fire Code Sections 2701 - 2703 & 2706, the New C-14 study material

Jia, Songtao

364

Lorem & Ipsum [Insert Date \\ Issue] EQUINEBOOSTERSOFMSU  

E-Print Network (OSTI)

] Check out the MSU Colt Starting Class on Facebook! Keep up to date on the progress of our students the know-how and the connections with buyers across the United States. Headwaters Livestock, located in Three Forks, MT holds cattle sales every Monday and horse sales as announced. Special feeder, stock cow

Dyer, Bill

365

Microsoft Word - Final Instructions_20110124.doc  

U.S. Energy Information Administration (EIA) Indexed Site

1905-0194 1905-0194 Expiration Date: 10/31/2013 November 18, 2010 Voluntary Reporting of Greenhouse Gases 171 Appendix N. Emission Factors for Steam and Chilled/Hot Water Emission Factors for Steam and Chilled/Hot Water for Emissions Inventories Use the emission factors in the following table to calculate indirect emissions from the consumption of purchased steam and hot/chilled water for emissions inventories. Energy Product Carbon Dioxide Methane Nitrous Oxide Steam or Hot Water Units of Measure kg/MMBtu g/MMBtu g/MMBtu Value a 88.18 8.169 0.603 Chilled Water Units of Measure kg/ton-hours cooling g/ton-hours cooling g/ton-hours cooling Absorption Chiller Using Natural Gas b 0.884 0.083 0.002 Engine-Driven Chiller Using Natural Gas

366

Microsoft Word - VIPERS instructions.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/18/2010 3/18/2010 Entering Invoices Through the Vendor Inquiry Payment Electronic Reporting System (VIPERS) 1.0 Applicability The purpose of this document is to provide an overview of the process to submit invoices electronically to the ORFSC and interface them into STARS using the Vendor Inquiry Payment Electronic Reporting System (VIPERS). It is recommended that the plan outlined below be used by Department of Energy vendors to submit electronic invoices and to check status of outstanding invoice payments. 2.0 Roles and Responsibilities Staff Accountant is responsible for ensuring that procedures are up to date and that the system is reviewed and updated when new regulations or process changes occur. 3.0 Required Procedures Step 1 If you already have a VIPERS logon, go to the VIPERS website

367

2014 NERSC allocation requests due September 22  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC allocation requests due September 22 2014 NERSC allocation requests due September 22 August 13, 2013 by Francesca Verdier (0 Comments) NERSC's allocation submission system is...

368

Date of Birth Declaration Office of the Registrar  

E-Print Network (OSTI)

that shows your birth date. (Examples: Driver's License, Birth Certificate, Passport, court or other legalDate of Birth Declaration Office of the Registrar http://registrar.wisc.edu OFFICE USE ONLY Date Date of Birth Month: Day: Year: By my signature, I hereby claim that my correct day of birth

Yavuz, Deniz

369

DOE-L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND VOLUME I, OFFER AND OTHER DOCUMENTS (a) Instruction - Cover Letter. The cover letter shall include, but not be limited to, the following: (1) The solicitation number. (2) The name, address, telephone numbers, facsimile numbers, and electronic addresses of the Offeror. (3) A statement identifying any exceptions or deviations the Offeror is taking to the terms and conditions specified in the contract (Sections A through K of this solicitation, as amended). However, exceptions and/or deviations are not sought and the Government is under no obligation to enter into discussions. Exceptions or deviations may constitute a deficiency. (4) The names, titles, telephone numbers, facsimile numbers, and

370

Graduate Students Seminar Bloomfield 527 14:30 15:30 The Due-Date Assignment Problem in Scheduling  

E-Print Network (OSTI)

Scheduling is a crucial aspect of operations control, be it in manufacturing or in service. The need in Scheduling: A Robust Optimization Approach Chen Bukay Supervisors: Hussein Naseraldin, Liron Yedidsion service levels necessitate efficient scheduling. There are various types of scheduling problems

Levit, Anna

371

Property:StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate" StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 April 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 August 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 December 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 February 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 January 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 January 2009 +

372

Research Highlights Sorted by Submission Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Submission Date Submission Date January 2014 Forecast Calls for Better Models: Examining the Core Components of Arctic Clouds to Clear Their Influence on Climate ARM ASR Ovink, J. December 2013 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species ASR Van Weverberg, K. All Mixed Up-Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds ARM ASR Fang, M., Albrecht, B. A. Ground Stations Likely Get a Boost from Satellites to Estimate Carbon Dioxide Emissions ARM Roeder, L. R. November 2013 Spectro-microscopic Measurements of Carbonaceous Aerosol Aging in Central California ARM ASR Gilles, M., Moffet, R. Digging Into Climate Models' Needs with SPADE ARM ASR Gustafson, W. I. Nailing Down Ice in a Cloud Model ARM ASR

373

Property:EndDate | Open Energy Information  

Open Energy Info (EERE)

using the property "EndDate" using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 May 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 September 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 January 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 March 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 March 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 February 2009 +

374

Evaluation of the commercial FBR introduction date  

SciTech Connect

This report examines one criterion for introducing a commercial FBR: economic competitiveness with a Light Water Reactor (LWR). For this analysis, the commercial FBR is assumed to be the fifth-of-a kind replicate which represents an economically mature plant. This FBR is deemed economically competitive when its life-cycle energy cost is less than or equal to that of an LWR. Results of this analysis are used in a comparative analysis of alternative FBR development stategies. The strategies evaluated in these studies assume both 1000- and 1457-MWe FBRs. Since the capital costs per kilowatt, and therefore the energy costs, for these two FBR sizes are different, they will become economically competitive at different times. The probability density function for the 1457-MW(e) FBR has an expected value date or weighted average date of 2030, compared with 2033 for the probability density function for the 1000-MW(e) FBR.

White, M.K.; Merrill, E.T.

1981-09-01T23:59:59.000Z

375

FY 2013 FRPC DATA REPORTING INSTRUCTIONS I. Background  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY 2013 FRPC DATA REPORTING INSTRUCTIONS I. Background Executive Order 13327, "Federal Real Property Asset Management" was created to promote the efficient and economical use of the Federal Government's real property assets. The E.O. established the interagency Federal Real Property Council (FRPC), established the role of the Senior Real Property Officer, and mandated the creation of a centralized real property database. This document provides instructions for populating the required data in FIMS so that the Department can report in accordance with the FY 2013 FRPC reporting requirements.

376

ENERGY STAR Industrial Plant Certification: Instructions for applying |  

NLE Websites -- All DOE Office Websites (Extended Search)

Industrial Plant Certification: Instructions for Industrial Plant Certification: Instructions for applying Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources

377

Design and analysis of instruction issue logic for hyperscaler processors  

E-Print Network (OSTI)

- ANISMS 20 A. Static vs dynamic scheduling . B. Tomasulo's algorit, hm . . C. Dispatch stack scheme D. Register update unit(RUU) E. Da. ddis and Torng scheme F. Hyperscalar instruction issue mechanism 20 21 ') 9 IV HYPERSCALAR INSTRUCTION ISSUE... REFERENCES . 67 VITA 70 LIST OF TABLES TABLE Page I An entry m a reservation station. II An entry in a dispatch stack III An entry in a re-order buffer. IV An entry in a central window. V An entry in a load/store window. Vl Weights of the different...

Kalyanasundharam, Vydhyanathan

1995-01-01T23:59:59.000Z

378

Application of dating for searching geothermic sources  

Science Journals Connector (OSTI)

A Geothermical field is usually associated with a volcanic region and, therefore, with an abundance of volcanic glasses such as obsidians. The magmatic chambers constitute an excellent source of heat for a geothermical system. These chambers can be geologically identified from the surface by its recent volcanic products. Therefore, the geological age of the volcanic — units is of great interest for a location of a worthwile thermal energy field. This paper presents some preliminary results of the ages obtained by dating obsidians.

L. Gutiérrez-Negrin; A. López-Martínez; M. Balcázar-García

1984-01-01T23:59:59.000Z

379

Facilitating conceptual change through instructional strategies: an experimental study using the Karplus Learning Cycle  

E-Print Network (OSTI)

fulfillment of the requirements for the degree of MASTER OF SCIENCE August 1990 Major Subject: Curriculum and Instruction Facilitating Conceptual Change Through Instructional Strategies: An Experimental Study Using the Karplus Learning Cycle A Thesis...

Pollard, Rebecca Janet

1990-01-01T23:59:59.000Z

380

Instructional Improvement: Building Capacity for the Professional Development of Librarians as Teachers  

E-Print Network (OSTI)

The purpose of this article is to review the state of instructional improvement programs in libraries and to draw on the broader literature of instructional improvement in higher education to identify issues to which the ...

Walter, Scott

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Applicant Accepts Application Instructions Page 1 Sustainable Energy Revolving Loan Fund  

E-Print Network (OSTI)

_________________ Applicant Accepts Application Instructions Page 1 Sustainable Energy Revolving Loan Fund INFORMATION & INSTRUCTIONS FOR APPLICANTS Introduction The Sustainable Energy Revolving Loan sustainable energy projects at Oregon State University. Projects should provide student learning opportunities

Escher, Christine

382

E-Print Network 3.0 - adapting web-based instruction Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

web-based instruction Search Powered by Explorit Topic List Advanced Search Sample search results for: adapting web-based instruction Page: << < 1 2 3 4 5 > >> 1 ADAPTIVE WEB-BASED...

383

The Use of Thinking Errors Instruction in Texas DAEPs as a Means to Improve Student Behavior  

E-Print Network (OSTI)

(TEC Chap. 37) mandates that DAEPs provide instruction in “self-discipline,” but it does not specify how this instruction is to be delivered. In addition, it does not provide for oversight or evaluation, so these requirements may be inconsistently...

Turner, Karen T.

2010-10-12T23:59:59.000Z

384

Prep mode rack kits for Frac-950 Instructions  

E-Print Network (OSTI)

Prep mode rack kits for Frac-950 Instructions Edition AB 56-3153-30 Installing the rack Assembling the rack Make sure that the guide pin fits! Place the guide pin legs at the side with the bulge! 1 2 3

Pawlowski, Wojtek

385

Deutsche Sommerschule am Pazifik Application Instructions --5-week program  

E-Print Network (OSTI)

Deutsche Sommerschule am Pazifik Application Instructions -- 5-week program Enclosed is your application for the 5-week program of the Deutsche Sommerschule am Pazifik, including a scholarship that these applications are considered in order of receipt, so early application is strongly recommended. The Deutsche

386

INSTALLATIONAND OPERATING INSTRUCTIONS FOR AQ-1 POWER VENT KIT  

E-Print Network (OSTI)

) including 25 foot control cable with 1/4" quick connect ends and an HPN 6 foot power cord 2. Nylon ties 1INSTALLATIONAND OPERATING INSTRUCTIONS FOR AQ-1 POWER VENT KIT DESIGNED FOR BOSCH 425 HN WATER OF CONTENTS contents with anAQ-1 power vent p.1 mounting gas pressure switch p.2 mounting linear spillage

Kostic, Milivoje M.

387

Sartobind Protein A 75 Membrane Adsorbers Operating Instructions  

E-Print Network (OSTI)

Sartobind Protein A 75 Membrane Adsorbers Operating Instructions A Separation Technology Based on Microporous Membranes 85030-517-47 Storage conditions Sartobind Protein A 75 Membrane Adsorbers have. Introduction Sartobind Protein A adsorbers represent a new generation of anti- body purification devices based

Lebendiker, Mario

388

Cooperative Extension Instruction Public Service Research USDA -Hatch Total  

E-Print Network (OSTI)

Cooperative Extension Instruction Public Service Research USDA - Hatch Total Sponsor Type Sponsor,021,707 DEPARTMENT OF HOMELAND SECURITY 1 $5,041 2 $608,619 3 $613,660 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION,137,910 244 $50,856,728 278 $54,994,638 INSTITUTE OF MUSEUM AND LIBRARY SERVICES 1 $49,296 1 $49

Arnold, Jonathan

389

Using Bytecode Instruction Counting as Portable CPU Consumption Metric  

E-Print Network (OSTI)

Using Bytecode Instruction Counting as Portable CPU Consumption Metric Walter Binder and Jarle-1015 Lausanne, Switzerland firstname.lastname@epfl.ch Abstract Accounting for the CPU consumption consumption information in order to detect a resource overuse of client components (detection of denial

Binder, Walter

390

State Employees PERFORMANCE PLANNING AND REVIEW (PPR) Form INSTRUCTIONS SHEET  

E-Print Network (OSTI)

SF-15 Rev. 9/02 State Employees PERFORMANCE PLANNING AND REVIEW (PPR) Form INSTRUCTIONS SHEET the rest of the document after use. PLANNING SESSION: All classified employees (restricted, job appointment, provisional, probational, or permanent) MUST have a planning session annually. SUPERVISOR'S CHECKLIST

Kulp, Mark

391

AFFIDAVIT OF INDIVIDUAL SURETY (See instructions on reverse)  

E-Print Network (OSTI)

identifying description; the market value; attach supporting certified documents including recorded lien account, and attach certified evidence thereof). 8.IDENTIFY ALL MORTGAGES, LIENS, JUDGEMENTS, OR ANY OTHER to average 3 hours per response, including the time for reviewing instructions, searching existing data

392

Instructions on Wide Format Printing Document Setup for Designing Posters  

E-Print Network (OSTI)

Instructions on Wide Format Printing Document Setup for Designing Posters Microsoft Word: (The--give it the project or poster name 2. Open Word 3. On Main Menu, choose "Page Layout" tab 4. In the "Page Setup 10. Start designing your poster 11. When your poster is complete, "Save" it as a Word Document

Bogaerts, Steven

393

Poster Printing Instructions As specified on our website,  

E-Print Network (OSTI)

Poster Printing Instructions As specified on our website, http://www.niu.edu/engagedlearning/research/undergraduate_research_day.shtml under "poster guidelines", your poster should be no larger than 32" x 40". Before submitting your poster to Media Services, ensure your faculty mentor has approved your final poster, as it will only be printed

Karonis, Nicholas T.

394

Barriers to Instructional Change Action research and professional development in  

E-Print Network (OSTI)

. Tilghman and W. B. Wood, "Education: Scientific teaching," Science. 304 (5670), 521- 522 (2004). http perspective," (Poster presented at the Foundations and Frontiers in Physics Education Research Conference, Bar1 Barriers to Instructional Change Action research and professional development in math, science

Henderson, Charles

395

Formatting Instructions for NIPS*2002 David S. Hippocampus  

E-Print Network (OSTI)

must be prepared according to the instructions pre­ sented here. Papers may be only up to 8 pages long categories: Algorithms and Architectures Applications Brain Imaging Cognitive Science and Artificial New Roman is the preferred typeface throughout. Paragraphs are separated by 1/2 line space

Roweis, Sam

396

Formatting Instructions for NIPS*2003 David S. Hippocampus  

E-Print Network (OSTI)

to the instructions pre- sented here. Papers may be only up to 8 pages long, including figures and references be submitted to any of the following ten categories: Algorithms and Architectures Applications Brain Imaging type with a vertical spacing of 11 points. Times New Roman is the preferred typeface throughout

Roweis, Sam

397

Formatting Instructions for NIPS*2003 David S. Hippocampus  

E-Print Network (OSTI)

must be prepared according to the instructions pre­ sented here. Papers may be only up to 8 pages long categories: Algorithms and Architectures Applications Brain Imaging Cognitive Science and Artificial New Roman is the preferred typeface throughout. Paragraphs are separated by 1/2 line space

Roweis, Sam

398

INSTRUCTION MANUAL digital pH/mV meter  

E-Print Network (OSTI)

INSTRUCTION MANUAL model 701A digital pH/mV meter /r^ ORION RESEARCH #12;contents Introduction 1 701A digital pH/mV meter is the ideal meter for all research and precision measurements with pH and chemical sensing electrodes. In both the absolute and relative mV modes, the meter covers a range of ± 1999

Kleinfeld, David

399

Honors Contract Form Instructions Part A: Initiating a Contract  

E-Print Network (OSTI)

Honors Contract Form Instructions Part A: Initiating a Contract This entire section should students to spend some time thinking about why they are contracting the specific course and what they expect to get out of it the contract. Honors Contract Activities Section: There are four separate boxes

Huang, Haiying

400

An Energy Efficient Instruction Prefetching Scheme for Embedded Processors  

E-Print Network (OSTI)

applications. For applications with a small amount of loops, we enhance the design with the existing Next Line performance and low energy consumption are all demanded. In this paper, we reduce energy overhead in instruction prefetching by using a sim- ple prefetching hardware/software design and an efficient prefetching

New South Wales, University of

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Department of Environmental Health and Instructional Safety Respiratory Protection  

E-Print Network (OSTI)

. Seal Check. 5. Respiratory Fit Testing. 6. Inspection Procedures. 7. Cleaning and Storage Instructions. Introduction #12;Respiratory Protection Page 2 A respirator is used to remove specific air contaminants by passing ambient air through an air purifying element, filters, cartridges, or canisters. Training

de Lijser, Peter

402

Instruction Guide General Information Services, Inc. (GiS)  

E-Print Network (OSTI)

Instruction Guide General Information Services, Inc. (GiS) EQuest+ Ordering and Viewing Process with your organization. GiS will contact you directly if we are in need of a copy of the signed REPORT 1. Go to website address: https://apps.geninfo.com/Login.aspx?CompanyParm=GIS-US 2. At the EQUEST

Butler, Laurie J.

403

APPLICATION INSTRUCTIONS FOR THE UNIVERSITY UTRECHT (UU) EXCHANGE PROGRAM  

E-Print Network (OSTI)

APPLICATION INSTRUCTIONS FOR THE UNIVERSITY UTRECHT (UU) EXCHANGE PROGRAM 1. Complete pages 1 and 2 in to Binghamton's Office of International Programs. Do not send anything directly to University Utrecht. Note and there is time to make the arrangements with University Utrecht. There is a $25 late application fee. 9/14/12 #12

Suzuki, Masatsugu

404

APPLICATION INSTRUCTIONS FOR THE UTRECHT SCHOOL OF ECONOMICS (USE)  

E-Print Network (OSTI)

APPLICATION INSTRUCTIONS FOR THE UTRECHT SCHOOL OF ECONOMICS (USE) EXCHANGE PROGRAM 1. Complete of International Programs. Do not send anything directly to University College Utrecht. Note: Please observe: ___________________________________________________________________________________________________________________________________ University City Country Administering SUNY Campus Please list any other programs you are applying for

Suzuki, Masatsugu

405

Characterizing Embedded Applications for Instruction-Set Extensible Processors  

E-Print Network (OSTI)

in meeting the challenging demand on performance without in- curring high cost in terms of energy and area of input and output ports to the register file is proportional to the number of input and output operands required by an instruction. The cost and energy consumption of a processor increase significantly

Mitra, Tulika

406

SMART Camp 2013. Returning student application form Instructions  

E-Print Network (OSTI)

SMART Camp 2013. Returning student application form Instructions: Print out and complete clearly participated in since the previous SMaRT camp? What do you expect from spending another term in SMaRT camp students of your group master the material. You will need to prepare to this work in advance, recalling

Boas, Harold P.

407

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

408

PAPER PREPARATION GUIDE AND SUBMISSION INSTRUCTIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

SENSITIVITY STUDY OF BUILDING PERFORMANCE USING 30-YEAR SENSITIVITY STUDY OF BUILDING PERFORMANCE USING 30-YEAR ACTUAL WEATHER DATA Tianzhen Hong 1, *, Wen-Kuei Chang 2 , Hung-Wen Lin 2 1 Lawrence Berkeley National Laboratory, 1 Cyclotron Road, Berkeley, CA 94720, USA 2 Green Energy and Environment Laboratories, Industrial Technology Research Institute, Taiwan, R.O.C. ABSTRACT Traditional energy performance calculated using building simulation with the typical meteorological year (TMY) weather data represents the energy performance in a typical year but not necessarily the average or typical energy performance of a building in long term. Furthermore, the simulated results do not provide the range of variations due to the change of weather, which is important in building energy management and risk assessment of energy

409

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator  

E-Print Network (OSTI)

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator Amy Irish. This moderate to heavy crop will mature close predicted dates. Blocks with light croploads will mature 3 or 4

410

Property:Incentive/StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate StartDate Jump to: navigation, search Property Name Incentive/StartDate Property Type Date Description Start Date. In order to see all values for this property, Property:Incentive/StartDateString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 50 subproperties: A Alcohol Fuels Exemption (Hawaii) Alternative Energy Personal Property Tax Exemption (Michigan) Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits (Maryland) B Broward County - Energy Sense Appliance Rebate Program (Florida) C CCEF - Commercial, Industrial, Institutional PV Grant Program (Connecticut) California Solar Initiative - Solar Thermal Program (California)

411

AHAM- CCE Overview and Update, dated 06/07/2011  

Energy.gov (U.S. Department of Energy (DOE))

This document is U.S. Department of Energy's presentation titled "AHAM - CCE Overview and Update", dated June 7, 2011.

412

2012 -2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network (OSTI)

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2012 - 2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

413

2013 -2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network (OSTI)

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2013 - 2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

414

Student ID Number Date of birth Cell Phone  

E-Print Network (OSTI)

Name Student ID Number Date of birth Cell Phone New Housing Student Current Housing Student All's phone Crime 2 Information about charges or crime convicted of Date of conviction Court convicted in Sentence received Probation dates Probation officer's name Probation officer's phone Consent: I authorize

Pantaleone, Jim

415

Title/Loc/Date: Slide # 1 Jo EllisMonaghan  

E-Print Network (OSTI)

Title/Loc/Date: Slide # 1 Jo Ellis­Monaghan e­mail: joellis@emba.uvm.edu website: http://academics.smcvt.edu/jellis­monaghan #12; Title/Loc/Date: Slide # 2 29(59,(:# . First some problems (network reliability, scheduling; Title/Loc/Date: Slide # 3 6RPH#3UHOLPLQDULHV# # 'HOHWLRQ

Ellis-Monaghan, Joanna

416

United States Government Department of Energy DATE:  

Office of Legacy Management (LM)

kE FJ325.8 d& * 9 -1 kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt & Refining, Cleveland, Ohio l Sutton, Steele & Steele, Dallas, Texas --------+. Norfolk Naval Station, Virginia In each case, the potential for radiological contamination above applicable guidelines is small. In each case the amounts of radioactive materials handled was small. Based on these considerations, these sites

417

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the NSLS-II Project Management of the NSLS-II Project OAS-RA-L-10-01 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy Memorandum DATE: April 6, 2010 Audit Report Number: OAS-RA-L-10-01 REPLY TO ATTN TO: IG-32 (A10RA006) SUBJECT: Report on "The Department of Energy's Management of the NSLS-II Project" TO: Manager, Brookhaven Site Office, SC-BHSO INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing

418

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Infrastructure Department's Infrastructure Modernization Projects under the Recovery and Reinvestment Act of 2009 OAS-RA-L-11-04 March 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 2, 2011 Audit Report Number: OAS-RA-L-11-04 REPLY TO ATTN OF: IG-34 (A10RA032) SUBJECT: Report on "The Department's Infrastructure Modernization Projects under the American Recovery and Reinvestment Act of 2009" TO: Manager, Oak Ridge Office Manager, Berkeley Site Office INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009. The goals of the Recovery Act are to retain or create jobs, increase

419

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Audit Report Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act OAS-RA-L-10-04 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025) SUBJECT: Report on "Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act" TO: Deputy Assistant Secretary, Energy Efficiency and Renewable Energy INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted to

420

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup Project OAS-RA-L-10-03 April 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019) SUBJECT: Report on "Moab Mill Tailings Cleanup Project" TO: Deputy Assistant Secretary, Program and Site Support, EM-50 INTRODUCTION AND OBJECTIVE The Moab Uranium Mill Tailings Remedial Action Project (Moab Project) is located at a former uranium-ore processing facility near Moab, Utah on the west bank of the Colorado River. In 2005, the Department of Energy (Department) issued a Record of Decision to relocate, by rail, approximately 16 million tons of uranium mill tailings from

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science's Energy Frontier Office of Science's Energy Frontier Research Centers OAS-RA-L-10-09 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 27, 2010 Audit Report Number: OAS-RA-L-10-09 REPLY TO ATTN OF: IG-32 (A10RA003) SUBJECT: Audit Report on "Office of Science's Energy Frontier Research Centers" TO: Associate Director, Office of Basic Energy Sciences, SC-22 INTRODUCTION AND OBJECTIVE In 2008, the Department of Energy's (Department) Office of Science (Science) issued a Funding Opportunity Announcement seeking applications from the scientific community for the establishment of Energy Frontier Research Centers (EFRCs). The purpose of the EFRCs is to integrate the talent and expertise of leading scientists to accelerate the rate of

422

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the Tank Farm Management of the Tank Farm Recovery Act Infrastructure Upgrades Project OAS-RA-L-11-03 February 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: February 9, 2011 Audit Report Number: OAS-RA-L-11-03 REPLY TO ATTN OF: IG-34 (A10RA043) SUBJECT: Report on "Management of the Tank Farm Recovery Act Infrastructure Upgrades Project" TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act) the Department of Energy (Department) awarded Washington River Protection Solutions (WRPS) approximately $324 million to accelerate completion of infrastructure upgrades for the Hanford Site's tank farms during the Fiscal Year (FY) 2009-2011 timeframe. These funds

423

DOE-EA-1184 Date Prepared:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

184 184 Date Prepared: Prepared by: Environmental Assessment for the Trunsfer of the DPRodd T~uct to the County of Los AIumos Los Alamos, New Mexico Final Document January 23,1997 US Department of Energy Los Alamos Area Office DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac-

424

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Management of Cloud Department's Management of Cloud Computing Services OAS-RA-L-11-06 April 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 1, 2011 Audit Report Number: OAS-RA-L-11-06 REPLY TO ATTN OF: IG-34 (A11TG021) SUBJECT: Report on "Department's Management of Cloud Computing Services" TO: Administrator, National Nuclear Security Administration Acting Under Secretary of Energy Under Secretary for Science Chief Information Officer INTRODUCTION AND OBJECTIVE Cloud computing enables convenient, on-demand access to shared computing resources that can be rapidly provided to users. According to the National Institute of Standards and Technology (NIST) and industry experts, benefits of the cloud computing model include the

425

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Audit Report Summary of Audit Report National Nuclear Security Administration's Use of Innovative Technologies to Meet Security Requirements This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act OAS-L-09-02 October 2008 The following is a summary o f a Special Access Unclassified Controlled Nuclear Information Audit Report, OAS-L-09-02, dated October 31, 2008, entitled "National Nuclear Security Administration's Use o f Innovative Technologies to Meet Security Requirements. The com~lete report is not available for public disclosure. BACKGROUND The Department of Energy (Department) developed the Design Basis Threat policy (DBT), which identified the most credible threats posed by potential adversaries to Departmental assets and

426

Effectiveness of computer-based instruction: An updated analysis  

Science Journals Connector (OSTI)

A meta-analysis of findings from 254 controlled evaluation studies showed that computer-based instruction (CBI) usually produces positive effects on students. The studies covered learners of all age levels — from kindergarten pupils to adult students. CBI programs raised student examination scores by 0.30 standard deviations in the average study, a moderate but significant effect. Size of effect varied, however, as a function of study feature. Effects were larger in published rather than unpublished studies, in studies in which different teachers taught experimental and control classes, and in studies of short duration. CBI also produced small but positive changes in student attitudes toward teaching and computers, and it reduced substantially the amount of time needed for instruction.

Chen-Lin C. Kulik; James A. Kulik

1991-01-01T23:59:59.000Z

427

Property:File/CreationDate | Open Energy Information  

Open Energy Info (EERE)

CreationDate CreationDate Jump to: navigation, search Property Name File/CreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same as the date when the file was first uploaded to OpenEI. Pages using the property "File/CreationDate" Showing 25 pages using this property. (previous 25) (next 25) B BOEMRE OCS.oil.gas.2007-12.map.pdf + 12 September 2008 + BOEMRE atlantic.OCS.multiple.use.map.2003.pdf + October 2003 + BOEMRE lease.platforms.santa.barb.map.5.2010.pdf + 18 May 2010 + BOEMRE oil.gas.plant.platform.sta.brbra.map.4.2010.pdf + April 2010 + BOEMRE platforms.leases.longbeach.map.5.2010.pdf + May 2010 + Banglmetst 221.pdf + 29 December 2004 + Black.Warrior.Basin usgs.map.pdf + 2007 + BrazilTMYst 238.pdf + 1 February 2005 +

428

Property:Incentive/StartDateString | Open Energy Information  

Open Energy Info (EERE)

StartDateString StartDateString Jump to: navigation, search Property Name Incentive/StartDateString Property Type String Description Start Date string property. Use this property in queries until the Property:Incentive/StartDate property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/StartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) + 01/01/2009 + A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + 3/11/2011 + AEP Appalachian Power - Residential Home Retrofit Program (West Virginia) + 3/11/2011 + AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 1/1/2008 +

429

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

430

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

431

Commitcoin: Carbon dating commitments with bitcoin  

E-Print Network (OSTI)

Abstract. In the standard definition of a commitment scheme, the sender commits to a message and immediately sends the commitment to the recipient interested in it. However the sender may not always know at the time of commitment who will become interested in verifying it. Further, when the interested party does emerge, it could be critical to establish when the commitment was made. Employing a proof of work protocol at commitment time will later allow anyone to “carbon date ” when the commitment was made, approximately, without trusting any external parties. We present CommitCoin, an instantiation of this approach that harnesses the existing processing power of the Bitcoin peer-to-peer network; a network used to mint and trade digital cash. 1 Introductory Remarks Consider the scenario where Alice makes an important discovery. It is important to her that she receives recognition for her breakthrough, however she would also like to keep it a secret until she can establish a suitable infrastructure for monetizing it. By forgoing publication of her discovery, she risks Bob independently making the same discovery and publicizing it as his own. Folklore suggests that Alice might mail herself a copy of her discovery and leave the letter sealed, with the postal service’s timestamp intact, for a later resolution time. If Bob later claims the same discovery, the

Jeremy Clark; Er Essex

432

POLICY BULLETIN: POL-5 - Declassification Instruction "25X1-human" |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY BULLETIN: POL-5 - Declassification Instruction "25X1-human" POLICY BULLETIN: POL-5 - Declassification Instruction "25X1-human" POLICY BULLETIN: POL-5 - Declassification Instruction "25X1-human" Provides instructions on the appropriate action to take when classification guide topics or source documents cite "25X1-human" declassification instructions. Policy Bulletin 5, Declassification Instruction "25X1-human" More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2011, Volume 2 No. 2

433

Property:ExpActivityDate | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDate ExpActivityDate Jump to: navigation, search Property Name ExpActivityDate Property Type Date Description Exploration Activity Date started or year of activity. Pages using the property "ExpActivityDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe At Desert Peak Area (Sladek, Et Al., 2007) + 2007 + 2-M Probe Survey At Coso Geothermal Area (1977) + 1977 + 2-M Probe Survey At Coso Geothermal Area (1979) + 1979 + 2-M Probe Survey At Coso Geothermal Area (2007) + 2007 + 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Acoustic Logs At Coso Geothermal Area (1977) + 1977 + Acoustic Logs At Coso Geothermal Area (2005) + 2005 +

434

Property:ExpActivityDateEnd | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDateEnd ExpActivityDateEnd Jump to: navigation, search Property Name ExpActivityDateEnd Property Type Date Description Date or year exploration activity ended. Pages using the property "ExpActivityDateEnd" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2006 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Aerial Photography At Coso Geothermal Area (1968-1971) + 1971 + C Compound and Elemental Analysis At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + Compound and Elemental Analysis At Salt Wells Area (Shevenell & Garside, 2003) + 2002 + Conceptual Model At Coso Geothermal Area (2005-2007) + 2007 + Controlled Source Frequency-Domain Magnetics At Salt Wells Area (Montgomery, Et Al., 2005) + 2004 +

435

Property:OpenEI/CETSI/PublicationDate | Open Energy Information  

Open Energy Info (EERE)

OpenEI/CETSI/PublicationDate OpenEI/CETSI/PublicationDate Jump to: navigation, search Property Name OpenEI/CETSI/PublicationDate Property Type Date Description The date the resource was first published. Pages using the property "OpenEI/CETSI/PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) A A Guide to Community Solar: Utility, Private, and Non-profit Project Development + 1 November 2010 + An Overview of Existing Wind Energy Ordinances + 1 December 2008 + Animal Farm Powers Village + 18 April 2011 + Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States + 5 January 2008 + C City of Aspen Climate Action Plan + 1 May 2007 + Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment + 5 October 2010 +

436

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

437

Property:HPBD/DateOfOccupancy | Open Energy Information  

Open Energy Info (EERE)

DateOfOccupancy DateOfOccupancy Jump to: navigation, search This is a property of type Date. Subproperties This property has the following 10 subproperties: H High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database Pages using the property "HPBD/DateOfOccupancy" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + January 4 + High Performance Buildings Database + January 6 + High Performance Buildings Database + October 2 +

438

EV Project Overview Report - Project to Date through December...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

439

SAVE THE DATE - 2015 National Environmental Justice Conference...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents & Publications 2014 NEJC Save the Date (English) ITP Aluminum: Technical Working Group on Inert Anode Technologies Leadership Transition Program (LTP) Application Package...

440

PRINCIPAL INVESTIGATOR Last Name First Name Date Institution  

NLE Websites -- All DOE Office Websites (Extended Search)

Funding Source Research Proprietary Non-proprietary (publication in open source or peer review journal expected) Objectives: Abstract: SCHEDULING Expected start date for...

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Relationship between standardized test improvement instruction and Stanford Nine Achievement Test scores.  

E-Print Network (OSTI)

??This study examined the relationship between standardized test instruction programs and Stanford Achievement Test Edition Nine scores. To examine this relationship, total basic skills scores… (more)

Marsh, Teresa R.

2004-01-01T23:59:59.000Z

442

ERIP application instructions. Final report, September 12, 1990--December 31, 1991  

SciTech Connect

This report provides background information and instructions to assist applicants in writing Energy-Related Inventions Program (ERIP) applications. Initial feedback fro usage for the new instructions shows that the best instructions would not be read and followed by all applicants. Applications from more than thirty applicants who have received the new instructions indicated that few had read the instructions. Based on this feedback, the instructions have been further revised to include a title page and table of contents. A warning was also added to advise applicants of the potential penalty of delayed review if these instructions are not followed. This revision was intended to address the possibility that some applicants did not see or bother to follow the instructions which followed the background information about ERIP. Included are two examples of ERIP applications which have been prepared for handout at workshops or mailing to applicants. Writing of example applications was time consuming and more difficult than expected for several reasons: (1) Full disclosures can be lengthy, very detailed, and technical. This contrasts with the desire to prepare examples which are comparatively short and easy for the non-technical person to read. (2) Disclosures contain confidential information which should not be published. (3) It is difficult to imagine that applicants will study examples when they do not bother to read the basic instructions.

Watt, D.M.

1992-01-02T23:59:59.000Z

443

Lovato learning: a guide for interactive, differential instruction in a high school remedial math class.  

E-Print Network (OSTI)

??The implementation of different instructional strategies and their affects on student attitudes toward learning will be investigated in two Northern Humboldt High School remedial math… (more)

Lovato, Susan

2006-01-01T23:59:59.000Z

444

Floating point only SIMD instruction set architecture including compare, select, Boolean, and alignment operations  

DOE Patents (OSTI)

Mechanisms for implementing a floating point only single instruction multiple data instruction set architecture are provided. A processor is provided that comprises an issue unit, an execution unit coupled to the issue unit, and a vector register file coupled to the execution unit. The execution unit has logic that implements a floating point (FP) only single instruction multiple data (SIMD) instruction set architecture (ISA). The floating point vector registers of the vector register file store both scalar and floating point values as vectors having a plurality of vector elements. The processor may be part of a data processing system.

Gschwind, Michael K. (Chappaqua, NY)

2011-03-01T23:59:59.000Z

445

2014 California Alliance for Minority Participation (CAMP) SUMMER APPLICATION INSTRUCTIONS AND INFORMATION  

E-Print Network (OSTI)

2014 California Alliance for Minority Participation (CAMP) SUMMER APPLICATION INSTRUCTIONS fax your application to (951) 827-2238. #12;2014 California Alliance for Minority Participation (CAMP

Reed, Christopher A.

446

Violent Wave Motion due to Impact Violent Wave Motion due to Impact  

E-Print Network (OSTI)

Violent Wave Motion due to Impact Violent Wave Motion due to Impact Mark J. Cooker School of Mathematics, University of East Anglia, Norwich, England. m.cooker@uea.ac.uk Theory of Water Waves, Cambridge Motion due to Impact 2. Pressure-Impulse Theory 214 M.J. COOKER AND D.H. PEREGRINE Y; O: .-- I mpact zone

447

Microsoft Word - SSO-StaffingAnalysis_Instructions.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Safety System Oversight (SSO) Staffing Analysis Method Proposed Safety System Oversight (SSO) Staffing Analysis Method Instructions for completing SSO Staffing Analysis Worksheet This Staffing Analysis calculation is completed using an Excel worksheet. Information locations are identified by titles in column or row headings and worksheet locations based on the unmodified blank worksheet attached. Use caution when making worksheet modifications since changes to the worksheet format may inadvertently change included formula referenced cells. Column Headings (worksheet row 5) Identify the years the staffing analysis will evaluate. Calendar years or fiscal years can be identified depending on your end use. The FTCP Workforce Analysis requests calendar year data. Budgeting and staffing decisions are

448

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network (OSTI)

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification Archery

Williams, Gary A.

449

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network (OSTI)

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of 0 (no knowledge) to 3_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Grether, Gregory

450

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network (OSTI)

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Williams, Gary A.

451

Computer Engineering Graduate Handbook Dated: February 06, 2014  

E-Print Network (OSTI)

Computer Engineering Graduate Handbook Dated: February 06, 2014 MASTER OF SCIENCE IN COMPUTER ENGINEERING Computer Engineering Program College of Engineering & Computer Science California State University-278-5987 Fax: 657-278-5804 http://www.fullerton.edu/ecs/cpe #12;Computer Engineering Graduate Handbook Dated

de Lijser, Peter

452

Form Date 4/4/01 Refrigerant Service Order Form  

E-Print Network (OSTI)

Recovery Unit ID # : Added Lbs oz Lbs oz Lbs oz Startup Charge Net Refrigerant Added: Lbs oz Parts UsedForm Date 4/4/01 Refrigerant Service Order Form Service ID: Owner: Work Order #: Building: Date: Issued: Completed: Equipment ID: Technicians: Location: Model: Manufact: Serial #: Refrigerant Type

Russell, Lynn

453

Revision Date 01.11.13 PROCUREMENT SERVICES -LOGISTICS  

E-Print Network (OSTI)

Revision Date 01.11.13 PROCUREMENT SERVICES - LOGISTICS Reading and Reconciling an ePro and MMD with your FACSID. Prerequisites: None Find Help: Email logistics_team@unc.edu #12;Procurement Services - Logistics Reading and Reconciling an ePro and MMD Statement Revision Date 01.11.13 Page 2 of 6 Departmental

Crews, Stephen

454

LSPE SAFE/ ARM SLIDE DATE 28 March 197  

E-Print Network (OSTI)

: ..'; I ~ ··,~ ' . LSPE SAFE/ ARM SLIDE NO. ATM-1088 REV. NO. PAGE OF- DATE 28 March 197 FAILURE/ ARM SLIDE FAILURE EVALUATION REPORT TABLE OF CONTENTS PURPOSE BACKGROUND DESCRIPTION OF FAILURE with Slides Having PAGI i DATE 0, Page 1 1 3 3 3 12 15 16 Larger Fillet Radius 16 6. 2 Slide Tests With 10

Rathbun, Julie A.

455

Dating Pleistocene Archeological Sites by Protein Diagenesis in Ostrich Eggshell  

Science Journals Connector (OSTI)

...loss than bone but were still depleted by 60% when the epimerization...I ratios and radiocarbon or uranium-series dates from each site...and A. J. T. Tull; and uranium-series dates were provided...Institute, National Institutes of Health, Bethesda, MD 20892. H...

A. S. Brooks; P. E. Hare; J. E. Kokis; G. H. Miller; R. D. Ernst; F. Wendorf

1990-04-06T23:59:59.000Z

456

An early date for cattle from Namaqualand, South Africa  

E-Print Network (OSTI)

An early date for cattle from Namaqualand, South Africa: implications for the origins of herding did cattle come to South Africa? Radiocarbon dates on a newly found cow horn indicates a time, the authors favour immigrants moving along a western route through Namibia. Keywords: South Africa

457

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page Key Dates for the 2014-2015 Einstein Fellowship Application process. On-line Application Opens September 24, 2013 Application Deadline 5:00pm EST December 4, 2013 Application Review 7-8 weeks Notification to Semi-Finalists [Travel Arrangements made for Interviews in Washington, DC] Late January 2014 Interviews in Washington, DC February 23-25, 2014 Finalists Notifications March 2014 Congressional Fellows Placement Interviews June - July 2014 Fellows Arrive in Washington, DC August 2014 Orientation meeting for the 2014-2015 Einstein Fellows

458

Ultrastructural Nuclear Changes Due to Tannic Acid  

Science Journals Connector (OSTI)

...Variations in Ultrastructural Nuclear Changes in Hepatocarcinogenesis...Cytochemical Studies on Nuclear Fine Structure. Exptl...Papers, p. 103. Tokyo, Japan, 1966. 58. Widnell...27 Ultrastructural Nuclear Changes Due to Tannic...Six hours. A high power view of a hepatocyte...

Antonio Racela; Harold Grady; and Donald Svoboda

1967-09-01T23:59:59.000Z

459

Is Hubble's Expansion due to Dark Energy  

E-Print Network (OSTI)

{\\it The universe is expanding} is known (through Galaxy observations) since 1929 through Hubble's discovery ($V = H D$). Recently in 1999, it is found (through Supernovae observations) that the universe is not simply expanding but is accelerating too. We, however, hardly know only $4\\%$ of the universe. The Wilkinson Microwave Anisotropy Probe (WMAP) satellite observational data suggest $73\\%$ content of the universe in the form of dark-energy, $23\\%$ in the form of non-baryonic dark-matter and the rest $4\\%$ in the form of the usual baryonic matter. The acceleration of the universe is ascribed to this dark-energy with bizarre properties (repulsive-gravity). The question is that whether Hubble's expansion is just due to the shock of big-bang & inflation or it is due to the repulsive-gravity of dark-energy? Now, it is believed to be due to dark-energy, say, by re-introducing the once-discarded cosmological-constant $\\Lambda$. In the present paper, it is shown that `the formula for acceleration due to dark-energy' is (almost) exactly of same-form as `the acceleration formula from the Hubble's law'. Hence, it is concluded that: yes, `indeed it is the dark-energy responsible for the Hubble's expansion too, in-addition to the current on-going acceleration of the universe'.

R. C. Gupta; Anirudh Pradhan

2010-10-19T23:59:59.000Z

460

Rev. 2/15/13 Instructional Technology Services ITS Food and Drink Policy  

E-Print Network (OSTI)

Rev. 2/15/13­ Instructional Technology Services ITS Food and Drink Policy OIT Computer Classrooms, Library 1st floor Learning Ground, BHB 225/6 IDSC). ITS (Instructional Technology Services) facilitates not have the time or ability to clean food/drink spills in computer classrooms or labs while also

Daescu, Dacian N.

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM036-02  

E-Print Network (OSTI)

DEPT OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM036-02 TITLE REPLACES PAGE Performing Spectral Calibration for Sequencing and Fragment Analysis on the ABI3730xl LM036-01 1(3) ISSUED OF EVOLUTIONARY BIOLOGY, UPPSALA UNIVERSITY INSTRUCTION LM036-02 TITLE REPLACES PAGE Performing Spectral

Uppsala Universitet

462

c Copyright by Scott Alan Mahlke, 1996 EXPLOITING INSTRUCTION LEVEL PARALLELISM  

E-Print Network (OSTI)

c Copyright by Scott Alan Mahlke, 1996 #12;EXPLOITING INSTRUCTION LEVEL PARALLELISM IN THE PRESENCE OF CONDITIONAL BRANCHES BY SCOTT ALAN MAHLKE B.S., University of Illinois, 1988 M.S., University of Illinois, Illinois #12;EXPLOITING INSTRUCTION LEVEL PARALLELISM IN THE PRESENCE OF CONDITIONAL BRANCHES Scott Alan

Mahlke, Scott A.

463

Applying Knowledge in New Contexts: A Comparison of Pre-and Post-Instruction Students  

E-Print Network (OSTI)

Applying Knowledge in New Contexts: A Comparison of Pre- and Post-Instruction Students Dyan L. Mc course with those who had not and thus could only apply knowledge obtained in an informal way. We sought. The data showed that students with no formal instruction tended to rely on experiential knowledge as one

Zollman, Dean

464

Date | 1Refrigeration and Air Conditioning EMA Education and Training Date | 2Refrigeration and Air Conditioning EMA Education and Training  

E-Print Network (OSTI)

Date | 1Refrigeration and Air Conditioning EMA Education and Training #12;Date | 2Refrigeration operating pressure (MOP) 5. De-humidifying (Te control) 6. Defrost funtions 7. Loss of charge detection (LOC control) 6. Defrost funtions 7. Loss of charge detection (LOC) 8. Bleed function 9. Sensor placement tips

Oak Ridge National Laboratory

465

Re-envisioning instructional technology research in higher education environments: a content analysis of a grant program  

Science Journals Connector (OSTI)

Within the field of instructional technology, scholars have long worked to define the scope and purpose of research and its role in informing practice. Increasingly, researchers outside of the instructional te...

Trena M. Paulus; Gina Phipps; John Harrison…

2012-12-01T23:59:59.000Z

466

* These programs include opportunities for degree completion through online learning. Please see the RIT Graduate Bulletin for additional portfolio instructions.  

E-Print Network (OSTI)

@it.rit.edu Instructional Technology; MS; Miller Analogies Test; Dr. C. J. Wallington, 585-475-2893, CJWICI

Zanibbi, Richard

467

Instruction Guide Training and Organizational Development June 2014  

E-Print Network (OSTI)

: Search screen At the Find an Existing Value tab, search for eligible employees Enter Department ID will be governed by the terms of their respective contracts. Part-time faculty and faculty on leave of absence, Raise Type F14, and Effective Date Click Search

Block, Louis

468

Instruction Guide Training and Organizational Development June 2014  

E-Print Network (OSTI)

employees Enter Department ID, Raise Type S14, and Effective Date Click Search Figure 1 Enter Department members in a collective bargaining unit will be governed by the terms of their respective contracts. Part Information > UF Raise Review Figure 1: Search screen At the Find an Existing Value tab, search for eligible

Block, Louis

469

Instruction Guide Training and Organizational Development June 2014  

E-Print Network (OSTI)

Month ­ August 16, 2014 Click Search Figure 1 Enter Department ID. Enter Effective Date. 12-month: 07 are eligible. Employees in a collective bargaining unit will be governed by the terms of their respective Additional Pay Review Figure 1: Search screen At the Find an Existing Value tab, search for eligible

Block, Louis

470

N8BmkInstructAug6Final  

NLE Websites -- All DOE Office Websites (Extended Search)

TRINITY / NERSC-8 RFP BENCHMARK RUN RULES TRINITY / NERSC-8 RFP BENCHMARK RUN RULES Page 1 of 8 August 6, 2013 Trinity / NERSC-8 MiniApplication, Microbenchmark, and SSP Instructions Introduction MiniApplication benchmarks and microbenchmarks will play a critical role in evaluation of the offered system. The Trinity/NERSC-8 benchmarks serve three purposes: 1. The MiniApplication benchmarks have been carefully chosen to represent characteristics of the expected Trinity and NERSC-8 workloads, both of which consist of solving complex scientific problems using diverse computational techniques at high degrees of parallelism. 2. The benchmarks give the Offeror the opportunity to provide NERSC and ACES with concrete data associated with the performance and scalability of the proposed system on applications that NERSC and ACES consider

471

Release of DRAFT RFP Headquarters Reading Room Instructions/Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Release of DRAFT RFP Release of DRAFT RFP Headquarters Reading Room Instructions/Guidelines 1. Reading Room Points of Contact: 7/21 - 8/8, Mike Baehre, (202) 586-6575 8/9 - Close of Draft RFP, John Bernier, (202) 586-6416 Reading Room Availability: By Appointment - Reading Room will be available until DRAFT RFP Closes. Reading Room Hours: Morning, 9:00 a.m. - 11:30 a.m.; and Afternoon 1:00 p.m. - 3:30 p.m. Reading Room Will Accommodate: Up to 5-6 people 2. All personnel must: a. Sign-in b. Identify their Company or Firm they work for or are affiliated c. Indicate if they have a "Q" clearance 3. Personnel must stay in the Reading Room to view documents. The "A" corridor is inside a classified area and all visitors to the Reading Room must be escorted at all times.

472

Microsoft Word - formeia8a_instructions_final  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Stocks Report - Annual Page 1 Form Approved OMB No. 1905-0167 Expires: 06/30/2014 Burden: 1.0 Hours General Instructions: A. PURPOSE. This survey collects coal stocks data from U.S. coal brokers, coal traders and coal terminals. Information on coal stocks is collected to provide Congress with basic statistics concerning consumer use as required by the Federal Energy Administration Act of 1974 (FEAA) (P.L. 93-275), as amended. These data appear in the Annual Coal Report, the Quarterly Coal Report, and the Monthly Energy Review. In addition, the U.S. Energy Information Administration uses the data in short-term and long-term models such as the Short-Term Integrated Forecasting System (STIFS) and the National Energy Modeling System (NEMS) Coal Market Module. The forecast data also

473

INSTRUCTIONS FOR USING HSPD-12 AUTHENTICATED OUTLOOK WEB ACCESS (OWA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7/2013 Page 1 7/2013 Page 1 INSTRUCTIONS FOR USING HSPD-12 AUTHENTICATED OUTLOOK WEB ACCESS (OWA) Outlook Web Access provides access to unencrypted email only and is suitable for use from any computer. HSPD-12 OWA REQUIREMENTS: ï‚· An EITS provided Exchange email account ï‚· A DOE issued HSPD-12 badge ï‚· DOEnet or Internet access and a supported web browser ï‚· A smart card reader installed* on your computer (*Windows Vista, Windows XP, MAC OS X 10.7 & 10.8, will also require smart card software to be installed in order to read the HSPD-12 badge) HSPD-12 OWA LOGIN PROCEDURE: 1. Insert HSPD-12 badge into card reader

474

Microsoft Word - Form OE-781R Instructions.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE-781R (3/88) Form Approved OE-781R (3/88) Form Approved OMB Number: 1901-0296 Expires: 4/30/10 REPORT OF INTERNATIONAL ELECTRIC IMPORT/EXPORT DATA Use of the reporting format is desirable. However data requested must be submitted by Permit holder. DOE does not consider the data to be confidential and will not treat it as such. According to the Paperwork Reduction Act of 1995, no persons are required to respond to a collection of information unless it displays a valid OMB control number. The valid OMB control number of this information collection is 1901-0296. The time required to complete the requested data is estimated to average 5 hours per response, including the time required to review instructions, search existing data resources, gather the data needed, and complete and

475

Optimized scalar promotion with load and splat SIMD instructions  

DOE Patents (OSTI)

Mechanisms for optimizing scalar code executed on a single instruction multiple data (SIMD) engine are provided. Placement of vector operation-splat operations may be determined based on an identification of scalar and SIMD operations in an original code representation. The original code representation may be modified to insert the vector operation-splat operations based on the determined placement of vector operation-splat operations to generate a first modified code representation. Placement of separate splat operations may be determined based on identification of scalar and SIMD operations in the first modified code representation. The first modified code representation may be modified to insert or delete separate splat operations based on the determined placement of the separate splat operations to generate a second modified code representation. SIMD code may be output based on the second modified code representation for execution by the SIMD engine.

Eichenberger, Alexandre E. (Chappaqua, NY); Gschwind, Michael K. (Chappaqua, NY); Gunnels, John A. (Yorktown Heights, NY)

2012-08-28T23:59:59.000Z

476

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81: Categorical Exclusion Determination 81: Categorical Exclusion Determination Solar Instructor Training Network - Midwest Provider CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Wisconsin Offices(s): Golden Field Office January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 27, 2012 CX-007879: Categorical Exclusion Determination Wasatch SunShot Streamlining and Simplifying Solar CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Utah Offices(s): Golden Field Office January 27, 2012 CX-007878: Categorical Exclusion Determination Texas Solar Collaboration to Streamline and Enable An Increase in Photovoltaic Capacity CX(s) Applied: A9, A11 Date: 01/27/2012

477

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2013 3, 2013 CX-010294: Categorical Exclusion Determination Building For Re-Roofing Project CX(s) Applied: B1.23, B2.1, B2.5 Date: 05/03/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010292: Categorical Exclusion Determination Modification to the Petrography Laboratory CX(s) Applied: B2.3, B3.6 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010291: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010289: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas

478

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 CX-009047: Categorical Exclusion Determination New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009046: Categorical Exclusion Determination Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009007: Categorical Exclusion Determination Northeast Provider of Solar Photovoltaic Instructor Training CX(s) Applied: A9, A11, B5.16 Date: 08/08/2012 Location(s): New York Offices(s): Golden Field Office August 8, 2012 CX-009045: Categorical Exclusion Determination Machining and Fabrication in 723-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

479

Save Energy, Save Date Night | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Save Date Night Energy, Save Date Night Save Energy, Save Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy How can I participate? Follow these tips to save energy and money this Valentine's Day. Valentine's Day. For many couples, it means cards, flowers, and prix fixe candlelight dinners. It also means for many couples a hefty withdrawal at the ATM to express their love. Fortunately, there are ways to save money by saving energy - even during the date - so you can spend the money you save on the things that really matter to your sweetheart. Here are five easy tips for those couples out there who want to save energy, save

480

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-003179: Categorical Exclusion Determination Mentasta Traditional Council CX(s) Applied: A9, A11 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003178: Categorical Exclusion Determination Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003169: Categorical Exclusion Determination Mecklenburg County Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010 Location(s): Mecklenburg County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 22, 2010 CX-003167: Categorical Exclusion Determination South Boston Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010

Note: This page contains sample records for the topic "instructions due date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

STUDENT RECREATION CENTER FACILITY REQUEST Group Name: ____________________________ Today's Date: __________  

E-Print Network (OSTI)

STUDENT RECREATION CENTER FACILITY REQUEST � Group Name: ____________________________ Today's Date:____________________ Time of Event: Start ______ Finish ______ � Facility Requested: o Lockridge Arena ____ Recreational Gym. _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ By requesting the Colorado School of Mines Student Recreation Center, I acknowledge that the requested activity

482

Solar Activity Index: Validity Supported by Oxygen Isotope Dating  

Science Journals Connector (OSTI)

...CENTURIES OF CLIMATIC RECORD FROM CAMP CENTURY ON GREENLAND ICE SHEET, SCIENCE...sup> concentration in Greenland Camp Century ice core, correlation with solar...activity absolute age Arctic region Camp Century ice core dates general listing...

J. R. Bray

1970-05-01T23:59:59.000Z

483

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date  

E-Print Network (OSTI)

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date Progress during: Summary of Coursework Progress (The Advisor should complete this section) Student's progress in this area): #12;Summary of Research Progress (The Advisor should complete this section) Student's progress

Contractor, Anis

484

Home Energy Score: Analysis & Improvements to Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Date, a presentation from the U.S. Department of Energy, by Joan Glickman Senior AdvisorProgram Manager, Home Energy Score, July 24, 2012. pilotanalysiswebinar7-24-12.pdf...

485

FIXED PRICE RESIDUAL FUNDS POLICY Policy dated March 29, 1999  

E-Print Network (OSTI)

FIXED PRICE RESIDUAL FUNDS POLICY Policy dated March 29, 1999 After completion of all deliverables required under a fixed-price award, after costs in fulfilling the requirements of the award have been

Weston, Ken

486

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network (OSTI)

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST METHOD SELECTION LIST ­ CRYPTOGRAPHIC AND SECURITY TESTING NVLAP CRYPTOGRAPHIC AND SECURITY TESTING APPLICATION FORM (REV. 2013 and Security (BCS)" testing and is considered the foundation of all scopes of accreditation

487

Injuries Due to Firearms in Three Cities  

Science Journals Connector (OSTI)

...its size. Galveston, an island city on the coast of Texas, has a population that is approximately 48 percent non-Hispanic white, 29 percent black, 21 percent Hispanic, and 2 percent Asian. In 1990, 24 percent of Galveston's citizens lived below the federal poverty line. In 1993, Galveston's rate of homicide... Injuries due to firearms are a major health problem in the United States.1–4 Although several studies have documented the impact of firearm-related deaths,5–15 little is known about the epidemiologic characteristics of nonfatal gunshot wounds.16–18 ...

Kellermann A.L.; Rivara F.P.; Lee R.K.

1996-11-07T23:59:59.000Z

488

Date Created: 3/12/12 12:13:00 PM Page 1 Instructions to Sign On and Off of Self Service Applications  

E-Print Network (OSTI)

is locked; contact the Help Desk at: 1-800-303-3290 - 1-504-568-HELP (4357) or the helpdesk@lsuhsc.edu. Also, and History. Click Delete. Internet Explorer 7 From the Tools menu in the upper right, select Internet

489

Property:NEPA ScopingInitiatedDate | Open Energy Information  

Open Energy Info (EERE)

ScopingInitiatedDate ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA ScopingInitiatedDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 3 December 2006 + C CA-017-05-051 + 10 February 2005 + CA-170-02-15 + 6 December 2001 + CA-96062042 + 6 June 1996 + D DOE-EA-1621 + 4 June 2008 + DOE-EA-1676 + 8 June 2008 + DOE-EA-1733 + 11 December 2009 + DOE-EA-1759 + 19 February 2010 + DOE-EIS-0298 + 18 April 1997 + DOI-BLM-CA-C050-2009-0005-EA + 9 April 2009 + DOI-BLM-CA-ES-2013-002+1793-EIS + 16 November 2012 + DOI-BLM-ID-220-2009-EA-3709 + 26 June 2009 + DOI-BLM-NV-B010-2011-0015-EA + 6 August 2010 +

490

Property:NEPA ApplicationDate | Open Energy Information  

Open Energy Info (EERE)

ApplicationDate ApplicationDate Jump to: navigation, search Property Name NEPA ApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA ApplicationDate" Showing 25 pages using this property. (previous 25) (next 25) C CA-670-2010-107 + 17 December 2008 + D DOI-BLM-CA-ES-2013-002+1793-EIS + 17 February 2010 + DOI-BLM-ID-110-2009-3825-CE + 4 June 2009 + DOI-BLM-ID-220-2009-EA-3709 + 12 February 2009 + DOI-BLM-ID-I020-2012-0017-CX + 21 October 2011 + DOI-BLM-NM-L000-2012-0046-CX + 4 January 2012 + DOI-BLM-NV-B020-2008-0071-DNA + 21 February 2008 + DOI-BLM-NV-B020-2008-????-?? + 11 April 2008 + DOI-BLM-NV-B020-2008-????-CX + 29 September 2008 + DOI-BLM-NV-B020-2009-0030-CX + 11 December 2008 + DOI-BLM-NV-B020-2010-0106-CX + 15 December 2009 +

491

Property:NEPA DecisionDocumentDate | Open Energy Information  

Open Energy Info (EERE)

DecisionDocumentDate DecisionDocumentDate Jump to: navigation, search Property Name NEPA DecisionDocumentDate Property Type Date This is a property of type Date. Subproperties This property has the following 1 subproperty: D DOI-BLM-UT-W019-2011-0006-CX Pages using the property "NEPA DecisionDocumentDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 18 December 2007 + C CA-170-02-15 + 21 February 2002 + CA-650-2005-086 + 3 June 2006 + CA-670-2010-107 + 26 May 2010 + CA-670-2010-CX + 27 January 2010 + CA-96062042 + 31 May 2000 + D DOE-EA-1621 + 23 September 2008 + DOE-EA-1676 + 2 December 2009 + DOE-EA-1733 + 21 June 2010 + DOE-EA-1759 + 28 May 2010 + DOE-EA-1849 + 22 August 2011 + DOI-BLM-CA-C050-2009-0005-EA + 11 September 2009 +

492

Study on an automatic sorting system for Date fruits  

Science Journals Connector (OSTI)

Abstract In the present study, a machine vision based, online sorting system was developed, the aim being to sort Date fruits (Berhee CV.) based at different stages of maturity, namely Khalal, Rotab and Tamar to meet consumers’ demands. The system comprises a conveying unit, illumination and capturing unit, and sorting unit. Physical and mechanical features were extracted from the samples provided, and the detection algorithm was designed accordingly. An index based on color features was defined to detect Date samples. Date fruits were fed on a conveyor belt in a row. When they were at the center of the camera’s field of view, a snapshot was taken, the image was processed immediately and the maturity stage of the Date was determined. When the Date passed the sensor, positioned at the end of the conveyor belt, a signal was sent to the interface circuit and an appropriate actuator, driven by a step motor, was actuated, leading the Date toward an appropriate port. For validation of proposed system performance, entire samples were again sorted by experts visually. Detection rate of the system for Tamar and Khalal was satisfactory. Although the detection rate was insufficient for the Rotab stage, there was no a significant difference between system accuracy and that obtained by the experts. The speed of image processing system was 0.34 s. System capacity was 15.45 kg/h.

Razieh Pourdarbani; Hamid Reza Ghassemzadeh; Hadi Seyedarabi; Fariborz Zaare Nahandi; Mohammad Moghaddam Vahed

2013-01-01T23:59:59.000Z

493

Property:NEPA RevisedApplicationDate | Open Energy Information  

Open Energy Info (EERE)

RevisedApplicationDate RevisedApplicationDate Jump to: navigation, search Property Name NEPA RevisedApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA RevisedApplicationDate" Showing 19 pages using this property. D DOI-BLM-CA-ES-2013-002+1793-EIS + 5 June 2012 + DOI-BLM-NV-C010-2010-0006-EA + 16 November 2009 + DOI-BLM-NV-C010-2010-0010-EA + 15 October 2009 + DOI-BLM-NV-C010-2011-0016-EA + 15 March 2011 + DOI-BLM-NV-C010-2012-0050-EA + 14 February 2012 + DOI-BLM-NV-C010-2012-0051-EA + 1 December 2011 + DOI-BLM-NV-C010-2012-0069-CX + 9 August 2012 + DOI-BLM-NV-C010-2012-0070-CX + 27 July 2012 + DOI-BLM-NV-E030-2011-0017-CX + 2 March 2011 + DOI-BLM-NV-W010-2010-0004-EA + 23 November 2009 + DOI-BLM-NV-W010-2011-0001-EA + 4 June 2010 +

494

Extreme events due to localisation of energy  

E-Print Network (OSTI)

We study a one-dimensional chain of harmonically coupled units in an asymmetric anharmonic soft potential. Due to nonlinear localisation of energy, this system exhibits extreme events in the sense that individual elements of the chain show very large excitations. A detailed statistical analysis of extremes in this system reveals some unexpected properties, e.g., a pronounced pattern in the inter event interval statistics. We relate these statistical properties to underlying system dynamics, and notice that often when extreme events occur the system dynamics adopts (at least locally) an oscillatory behaviour, resulting in, for example, a quick succession of such events. The model therefore might serve as a paradigmatic model for the study of the interplay of nonlinearity, energy transport, and extreme events.

Colm Mulhern; Stephan Bialonski; Holger Kantz

2015-01-09T23:59:59.000Z

495

December 26, 2012 12:27 WSPC/INSTRUCTION FILE acs-revision-disagreementreviews-v2  

E-Print Network (OSTI)

December 26, 2012 12:27 WSPC/INSTRUCTION FILE acs-revision- disagreementreviews-v2 Advances and cultural structures that anticipate, in part or in whole, this kind of collabo- 1 #12;December 26, 2012 12

Grimaldo, Francisco

496

The Effects of a Standards-Based Curriculum on Science Teachers' Instructional Decisions  

E-Print Network (OSTI)

Teachers are an essential link between the curriculum and student achievement. Teachers make instructional decisions that (1) determine the success or failure of a curricular intervention and (2) can result in either alignment or disconnect between...

Metty, Jane Maureen

2011-10-21T23:59:59.000Z

497

INSTRUCTIONS FOR USING THE MONOTONEADP MATLAB CODE DANIEL R. JIANG AND WARREN B. POWELL  

E-Print Network (OSTI)

INSTRUCTIONS FOR USING THE MONOTONE�ADP MATLAB CODE DANIEL R. JIANG AND WARREN B. POWELL The provided MATLAB files implement the Monotone�ADP algorithm, adapted for the post�decision case. The two

Powell, Warren B.

498

Instructions for use Teacher Education in Finland: Knowledge Building in the Chemistry and Physics  

E-Print Network (OSTI)

Instructions for use #12;33 Teacher Education in Finland: Knowledge Building in the Chemistry of Teacher Education, University of Helsinki, Finland Abstract Teacher education in Finland is described

Tachizawa, Kazuya

499

Cognitive, demographic, and motivational factors as indicators of help-seeking in supplemental instruction  

E-Print Network (OSTI)

The purpose of this study was to determine how cognitive, demographic, and motivational factors can be used to understand help-seeking behavior in college students. Specifically, the study examined engagement in Supplemental Instruction (SI...

McGee, Joel Vick

2005-08-29T23:59:59.000Z

500

Instructions for connecting to the Sun Workstations Using the EOD Client.  

E-Print Network (OSTI)

Instructions for connecting to the Sun Workstations Using the EOD Client. 1. The Exceed on Demand (EOD) client (version 6) is currently installed on all work stations in the Old Union labs

Califf, Mary Elaine