Powered by Deep Web Technologies
Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION  

SciTech Connect

SECTION 01000桽UMMARY OF WORK PART 1桮ENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor抯 responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to fuel systems. 4. Install power to new dampers/louvers from panel and breakers as shown on drawings. Wiring shall be similar to installation to existing dampers/louvers. Utilize existing conduits already routed to louver areas to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to new dampers/louvers. 5. Install power to jacket water heaters for new generators 3 and 4 from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 6. Install new neutral grounding resistor and associated parts and wiring for new generators 3 and 4 to match existing installation for generators 1 and 2. Grounding resistors will be Government Furnished Equipment (GFE). 7. Install two new switchgear sections, one for generator #3 and one for generator #4, to match existing generator #1 cubicle design and installation and in accordance with drawings and existing parts lists. This switchgear will be provided as GFE. 8. Ground all new switchgear, generators 3 and 4, and any other new equipment to match existing grounding connections for generators 1 and 2, switchgear and other equipment. See drawings for additional details. Grounding grid is already existing. Ensure that all grounding meets National Electrical Code requirements. 9. Cummins DMC control for the generator and switchgear syste

Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

2006-07-01T23:59:59.000Z

2

Microsoft Word - NO-MM-827 New Orleans Emergency Generator Installation (900 building).docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MM-827 MM-827 Title: New Orleans Emergency Generator Installation (900 Building) Description: Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to relocate the New Orleans emergency generator at the 900 building, to install a new Automatic Transfer Switch, and to provide generator status alarms. Tasks includes construction of a new concrete slab foundation, relocation of the existing portable generator from the trailer to the foundation, electrical installation of the generator, installation of fencing around the generator, and miscellaneous architectural work. Some of the existing equipment and components being dismantled, removed or demolished have been designated for government salvage. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021)

3

U.S. Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000  

Energy.gov (U.S. Department of Energy (DOE))

Report detailing the various codes and standards that are applicable for the installation, operation, and performance of microturbines.

4

Environmental Assessment for the Installation and Operation of Combustion Turbine Generators at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOElEA- 430 DOElEA- 430 LA-UR-02-6482 Nationat Nudea- Security Administration Environmental Assessment for the Installation and Operation of Combustion Turbine Generators at Los Alamos National Laboratory, Los Alamos, New Mexico December II,2002 Department of Energy National Nuclear Security Administration Los Alamos Site Office Environmental Assessment for the Installation and Operation of Combustion Turbine Generators at LANL DOE LASO December 11, 2002 iii Contents ACRONYMS AND TERMS.......................................................................................................V EXECUTIVE SUMMARY ....................................................................................................... IX 1.0 PURPOSE AND NEED ........................................................................................................1

5

Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators  

Energy.gov (U.S. Department of Energy (DOE))

This tip sheet outlines the benefits of high-pressure boilers with backpressure turbine-generators as part of optimized steam systems.

6

Table 11.6 Installed Nameplate Capacity of Fossil-Fuel Steam-Electric Generators With Environmental Equipment, 1985-2010 (Megawatts)  

U.S. Energy Information Administration (EIA) Indexed Site

Installed Nameplate Capacity of Fossil-Fuel Steam-Electric Generators With Environmental Equipment," Installed Nameplate Capacity of Fossil-Fuel Steam-Electric Generators With Environmental Equipment," " 1985-2010 (Megawatts)" "Year","Coal",,,,"Petroleum and Natural Gas",,,,"Total 1" ,,,"Flue Gas","Total 2",,,"Flue Gas","Total 2",,,"Flue Gas","Total 2" ,"Particulate","Cooling","Desulfurization",,"Particulate","Cooling","Desulfurization",,"Particulate","Cooling","Desulfurization" ,"Collectors","Towers","(Scrubbers)",,"Collectors","Towers","(Scrubbers)",,"Collectors","Towers","(Scrubbers)"

7

A new experimental technique for investigation of plasma generated with plasmotrons in electrophysical installations  

E-Print Network (OSTI)

discharges and electric arc generators of low temperature plasma 颅 plasmotrons [8, 9]. Plasmotron allows of megawatt. In palsmotron internal energy of electric arc transforms in internal energy of gas surrounding, increasing destruction speed, reducing consumption of electric power and consumable chemicals, and a whole

Boyer, Edmond

8

Proposal for the Award of a Contract for the Supply and Installation of a gas Turbine for Combined Generation of Electricity and Heat in the Heating Plant on the Meyrin Site  

E-Print Network (OSTI)

Proposal for the Award of a Contract for the Supply and Installation of a gas Turbine for Combined Generation of Electricity and Heat in the Heating Plant on the Meyrin Site

1994-01-01T23:59:59.000Z

9

Measurement of the underwater noise levels generated from marine piling associated with the installation of offshore wind turbines.  

Science Journals Connector (OSTI)

Marine piling is the most commonly used method for the installation of offshore wind turbines in the shallow coastal waters in the UK and consists of steel mono?piles being driven into the seabed using powerful hydraulic hammers. This is a source of impulsive sound of potentially high level that can travel a considerable distance in the water column and has the potential for impact on marine life. This presentation describes methodologies developed for measurement of marine piling and for the estimation of the energy source level. Measurements are presented for piles of typically 5 m in diameter driven by hammers with typical strike energies of 1000 kJ. Data were recorded as a function of range from the source using vessel?deployed hydrophones and using fixed acoustic buoys that recorded the entire piling sequence including soft start. The methodology of measurement is described along with the method of estimation of the energy source level. Limitations and knowledge gaps are discussed.

Pete D. Theobald; Stephen P. Robinson; Michael A. Ainslie; Christ A. F. de Jong; Paul A. Lepper

2011-01-01T23:59:59.000Z

10

The Costs, Air Quality, and Human Health Effects of Meeting Peak Electricity Demand with Installed Backup Generators  

Science Journals Connector (OSTI)

E.G. thanks John Dawson, Rob Pinder, and Pavan Racherla for assistance with the PMCAMx model, and Janet Joseph, Peter Savio, and Gunnar Walmet from NYSERDA for useful information about backup generators and emergency demand response programs in New York City. ...

Elisabeth A. Gilmore; Lester B. Lave; Peter J. Adams

2006-10-21T23:59:59.000Z

11

Developer Installed Treatment Plants  

E-Print Network (OSTI)

-installed treatment plants. These treatment plants are more commonly known as package wastewater treatment plants. 1

unknown authors

2008-01-01T23:59:59.000Z

12

Telecommunications Frontier Client Installation  

E-Print Network (OSTI)

Telecommunications Frontier Client Installation 1. Fax the completed form to 979.847.1111. 2 Signature Date Telecommunications Office Use Only Service Due Date: Installation Cost: Billed To: Print Form

13

installed capacity | OpenEI  

Open Energy Info (EERE)

installed capacity installed capacity Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments

14

Photovoltaic Installations at Williams College Ruth Aronoff  

E-Print Network (OSTI)

generation using solar power. Photovoltaic (PV) panel installations are a simple way for the College facilities, it is now evaluating in detail the environmental impact of these actions. In addition to making1 Photovoltaic Installations at Williams College Ruth Aronoff Williams Luce Project SUMMARY

Aalberts, Daniel P.

15

CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-PNSO-0657 -PNSO-0657 CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC POWER GENERATION ARRAY AND ELECTRIC CAR CHARGING STATIONS, ENVIRONMENTAL MOLECULAR SCIENCES LABORATORY, PACIFIC NORTHWEST SITE OFFICE, RICHLAND, WASHINGTON Proposed Action The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to install a photovoltaic power generation array and electric car charging stations. Location of Action The proposed action would occur in a landscaped infiltration swale located immediately

16

Installation and Acceptance Stage  

Directives, Delegations, and Requirements

This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

1997-05-21T23:59:59.000Z

17

Automated solar collector installation design  

DOE Patents (OSTI)

Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

2014-08-26T23:59:59.000Z

18

Estimating SCR installation costs  

SciTech Connect

The EUCG surveyed 72 separate US installations of selective catalytic reduction (SCR) systems at coal-fired units totalling 41 GW of capacity to identify the systems' major cost drivers. The results, summarized in this article, provide excellent first-order estimates and guidance for utilities considering installing the downstream emissions-control technology. 4 figs., 1 tab.

Marano, M.; Sharp, G. [American Electric Power (United States)

2006-01-15T23:59:59.000Z

19

Solar installer's training program  

SciTech Connect

Instructions are given for the installation of solar domestic water heating systems, space heating systems, and pool heating systems. The basic procedures for installing any solar heating system are presented with reference to solar domestic hot water systems, and the space and pool systems are taught on that basis. (LEW)

Schmidt, W.J.; Philbin, J.

1981-01-01T23:59:59.000Z

20

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Installed Performance HVAC Installed Performance ESI, Tim Hanes Context * The building envelope has historically been the focus in residential homes. * The largest consumer of energy in residential homes is typically the HVAC system. * Testing the performance of the HVAC system has not been pursued to its full potential. Technical Approach * Currently very little performance testing is being done to the HVAC system. * The only way to know if a HVAC system is operating correctly is to measure the Btu/h. * This should be done at the equipment and at the the system. Recommended Guidance * Training of HVAC technicians, installers, and salespeople is a must. * If only the technician is trained than implementing the change will not happen. * Public awareness of proper installation and its

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question 岺VAC proper installation energy savings: over-promising or under-delivering?"

22

Property:InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name InstalledCapacity Property Type Quantity Description Installed Capacity (MW) or also known as Total Generator Nameplate Capacity (Rated Power) Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

23

Installed Geothermal Capacity | Open Energy Information  

Open Energy Info (EERE)

Geothermal Capacity Geothermal Capacity Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Installed Geothermal Capacity International Market Map of U.S. Geothermal Power Plants List of U.S. Geothermal Power Plants Throughout the world geothermal energy is looked at as a potential source of renewable base-load power. As of 2005 there was 8,933 MW of installed power capacity within 24 countries. The International Geothermal Association (IGA) reported 55,709 GWh per year of geothermal electricity. The generation from 2005 to 2010 increased to 67,246 GWh, representing a 20% increase in the 5 year period. The IGA has projected that by 2015 the new installed capacity will reach 18,500 MW, nearly 10,000 MW greater than 2005. [1] Countries with the greatest increase in installed capacity (MW) between

24

Offshore Wind Turbines and Their Installation  

Science Journals Connector (OSTI)

Offshore winds tend to be higher, more constant and not disturbed by rough terrain, so there is a large potential for utilizing wind energy near to the sea. Compared with the wind energy converters onland, wind turbine components offshore will subject ... Keywords: renewable energy, wind power generation, offshore wind turbines, offshore installation

Liwei Li; Jianxing Ren

2010-01-01T23:59:59.000Z

25

Telecommunications Keyless Entry Hardware Install  

E-Print Network (OSTI)

Telecommunications Keyless Entry Hardware Install 1. Fax completed form to 979.847.1111. 2. If you Telecommunications Office Use Only Service Due Date: Installation Cost: Billed To: Print Form #12;

26

Installation Guide 1. PREFACE .................................................................................................................................................... 3  

E-Print Network (OSTI)

AoC Installation Guide #12;Contents 1. PREFACE....................................................................................................................................................... 4 3.2 AOC............................................................................................................................................................. 4 3.3 AOC ADMIN

Natvig, Lasse

27

HTAR Client Configuration and Installation  

NLE Websites -- All DOE Office Websites (Extended Search)

Configuration and Installation Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a machine which has more than one network interface, you may want to change some of these default settings. To help with this, an interactive Configure script is provided. To use it do $ ./Configure prior to installing. Configure will provide a description of the options

28

Magnet Girder Assembly and Installation  

ScienceCinema (OSTI)

It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

None

2013-07-17T23:59:59.000Z

29

Solar Installation Labor Market Analysis  

SciTech Connect

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.; Jordan, P.; Carrese, J.

2011-12-01T23:59:59.000Z

30

Foldtrack Installation in C-110  

Energy.gov (U.S. Department of Energy (DOE))

Crews successfully installed a new and improved version of the Foldtrack into tank C-110, a single-shell tank with about 17,200 gallons of waste remaining.

31

E-Print Network 3.0 - air conditioning installations Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Las Vegas, Nevada, to develop, design, procure, install, and operate an on-site hydrogen generation Source: DOE Office of Energy Efficiency and Renewable Energy, Hydrogen, Fuel...

32

Solar Installation Labor Market Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation Labor Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence Technical Report NREL/TP-6A20-49339 December 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence

33

Process Improvement at Army Installations  

E-Print Network (OSTI)

and pressed, and the cans are then placed on a conveyor belt. On this conveyor belt, which constitutes one of the production bottlenecks, a plastic cap and starter cap is installed in each can. The final steps for each can include installing the lid... each fuse. Load and Packout When the cans arrive at the Load and Packout building, they are manually removed and loaded on to both sides of a conveyor belt. The conveyor transports the cans to the tape and stencil machine where they are hand...

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

34

Using Backup Generators  

Energy.gov (U.S. Department of Energy (DOE))

Power outages are commonplace during disasters, and they may last for several days. You can reduce losses and speed the recovery process by installing an emergency generator. Portable generators...

35

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network (OSTI)

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS Refrigerant Charge Verification 颅 Standard to refrigerant charge verification for compliance, a MECH-24 Certificate (instead of this MECH-25 Certificate) should be used to demonstrate compliance with the refrigerant charge verification requirement. TMAH

36

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network (OSTI)

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-26-HERS Refrigerant Charge Verification 颅 Alternate are specified in Reference Residential Appendix RA3.2. If refrigerant charge verification is requiredR-MECH-26-HERS Refrigerant Charge Verification 颅 Alternate Measurement Procedure (Page 2 of 3) Site

37

ADA Requirements for Workplace Charging Installation  

Energy.gov (U.S. Department of Energy (DOE))

Best Practices for installing PEV charging stations in compliance with the Americans with Disabilities Act.

38

SunShot Initiative: Installation and Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation and Performance to Installation and Performance to someone by E-mail Share SunShot Initiative: Installation and Performance on Facebook Tweet about SunShot Initiative: Installation and Performance on Twitter Bookmark SunShot Initiative: Installation and Performance on Google Bookmark SunShot Initiative: Installation and Performance on Delicious Rank SunShot Initiative: Installation and Performance on Digg Find More places to share SunShot Initiative: Installation and Performance on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Installation and Performance Photo of a group of men moving a rectangular solar panel. Energy Secretary Steven Chu watches members of the Solar Instructor

39

ACS Installation During SM3B Introduction  

E-Print Network (OSTI)

ACS Installation During SM3B Introduction: 路 Installed during SM3B in March 2002 路 Powerful 3rd 路 Over-voltage Protection kit installed 路 Optical Control Electronics connected 路 New Outer Blanket Layer, and coronagraph 颅 Solar Blind Channel (SBC) : HST's most sensitive ultraviolet photon-counting detector 115-180 nm

Sirianni, Marco

40

ATLAS Installation Guide R. Clint Whaley  

E-Print Network (OSTI)

ATLAS Installation Guide R. Clint Whaley November 2, 2007 Abstract This note provides a brief overview of ATLAS, and describes how to install it. It includes extensive discussion of common configure to configure and build the ATLAS package, this note also describes how an installer can confirm

Whaley, R. Clint

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Environmental Assessment Kotzebue Wind Installation Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND INSTALLATION PROJECT KOTZEBUE, ALASKA AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The DOE is proposing to provide financial .assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska.

42

Harmonic filters influences regarding the power quality on high frequency electrothermal installation with electromagnetic induction  

Science Journals Connector (OSTI)

This paper presents a study regarding the functioning of a melting/hardening electrothermal installation with electromagnetic induction from the point of view of generated harmonics in the power distribution. The authors made simulations in scope of ... Keywords: electrothermal installation, harmonic, passive filters, static converter

Raluca Rob; Ioan Sora; Caius Panoiu; Manuela Panoiu

2010-01-01T23:59:59.000Z

43

Researches regarding the electric energy quality on high requency electrothermal installation with electromagnetic induction  

Science Journals Connector (OSTI)

This paper presents a study regarding the functioning of a melting/hardening electrothermal installation with electromagnetic induction from the point of view of generated harmonics in the power distribution. The authors made simulations in scope of ... Keywords: electrothermal installation, harmonic, passive filters, static converter

Raluca Rob; Ioan Sora; Caius Panoiu; Manuela Panoiu

2009-10-01T23:59:59.000Z

44

Purchase and Installation of a Geothermal Power Plant to Generate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

feasibility of the use of an existing low-temperature geothermal resource for combined heat and power; and Maintain and enhance existing geothermal district heating operation....

45

Help Your Employer Install Electric Vehicle Charging | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Help Your Employer Install Electric Vehicle Charging Help Your Employer Install Electric Vehicle Charging Help Your Employer Install Electric Vehicle Charging Educate your employer...

46

Sundance, Skiing and Solar: Park City to Install New PV System | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sundance, Skiing and Solar: Park City to Install New PV System Sundance, Skiing and Solar: Park City to Install New PV System Sundance, Skiing and Solar: Park City to Install New PV System October 25, 2010 - 10:49am Addthis Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac Building at the end of the month. | Photo courtesy of Park City | Park City, UT has completed several green projects recently. The town is installing a solar energy system on top of the Marsac Building at the end of the month. | Photo courtesy of Park City | Paul Lester Communications Specialist for the Office of Energy Efficiency and Renewable Energy What does this project do? 80-panel solar energy system to be installed at Park City's Marsac Building. Recovery Act-funded system to generate up to 15% of the building's

47

Install Removable Insulation on Valves and Fittings  

Energy.gov (U.S. Department of Energy (DOE))

This tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving steam systems using low-cost, proven practices and technologies.

48

Install Electric Vehicle Charging at Work  

Energy.gov (U.S. Department of Energy (DOE))

Employers who install workplace charging for plug-in electric vehicles (PEVs) demonstrate leadership, show a willingness to adopt advanced technology, and increase consumer exposure and access to...

49

Installation and Performance | Department of Energy  

Energy Savers (EERE)

Installation and Performance Photo of a group of men moving a rectangular solar panel. DOE partners with the solar industry to help reduce labor costs and maximize system...

50

Dynamically installed anchors for floating offshore structures.  

E-Print Network (OSTI)

??The gradual depletion of shallow water hydrocarbon deposits has forced the offshore oil and gas industry to develop reserves in deeper waters. Dynamically installed anchors (more)

Richardson, Mark Damian

2008-01-01T23:59:59.000Z

51

Install an Automatic Blowdown-Control System  

Energy.gov (U.S. Department of Energy (DOE))

This steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

52

EM, County Install Sewer Line for Development  

Energy.gov (U.S. Department of Energy (DOE))

Crews are installing a sewer line in the Portsmouth site to connect EM抯 sewer treatment facility to the Pike County Manufacturing Center, which is being developed.

53

Hawaii Well Construction & Pump Installation Standards | Open...  

Open Energy Info (EERE)

and pump installation standards in Hawaii. Author State of Hawaii Commission on Water Resource Management Published State of Hawaii, 22004 DOI Not Provided Check for DOI...

54

Hawaii Well Construction & Pump Installation Standards Webpage...  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage provides...

55

WINDExchange: U.S. Installed Wind Capacity  

Wind Powering America (EERE)

The animation shows the progress of installed wind capacity between 1999 and 2013. The Energy Department's annual Wind Technologies Market Report provides information about wind...

56

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS  

E-Print Network (OSTI)

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS V.R. Kozak Budker Institute There was designed a set of devices for automation systems of physical installations. On this basis approach. KEY WORDS Automation, systems, applications, CANBUS, embedded, controller. 1. Introduction Budker

Kozak, Victor R.

57

Arduino Tool: For Interactive Artwork Installations  

E-Print Network (OSTI)

The emergence of the digital media and computational tools has widened the doors for creativity. The cutting edge in the digital arts and role of new technologies can be explored for the possible creativity. This gives an opportunity to involve arts with technologies to make creative works. The interactive artworks are often installed in the places where multiple people can interact with the installation, which allows the art to achieve its purpose by allowing the people to observe and involve with the installation. The level of engagement of the audience depends on the various factors such as aesthetic satisfaction, how the audience constructs meaning, pleasure and enjoyment. The method to evaluate these experiences is challenging as it depends on integration between the artificial life and real life by means of human computer interaction. This research investigates "How Adriano fits for creative and interactive artwork installations?" using an artwork installation in the campus of NTNU (Norwegian University...

Shaikh, Murtaza Hussain

2012-01-01T23:59:59.000Z

58

Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska  

SciTech Connect

The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

NONE

1998-05-01T23:59:59.000Z

59

Electricity production and cooling energy savings from installation of a  

NLE Websites -- All DOE Office Websites (Extended Search)

production and cooling energy savings from installation of a production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Title Electricity production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Publication Type Journal Article Year of Publication 2013 Authors Ban-Weiss, George, Craig P. Wray, William W. Delp, Peter Ly, Hashem Akbari, and Ronnen M. Levinson Journal Energy and Buildings Volume 56 Pagination 210 - 220 ISSN 0378-7788 Keywords Advanced Technology Demonstration, building design, Building heat transfer, cool roof, energy efficiency, Energy Performance of Buildings, energy savings, Energy Usage, energy use, Heat Island Abstract Reflective roofs can reduce demand for air conditioning and warming of the atmosphere. Roofs can also host photovoltaic (PV) modules that convert sunlight to electricity. In this study we assess the effects of installing a building integrated photovoltaic (BIPV) roof on an office building in Yuma, AZ. The system consists of thin film PV laminated to a white membrane, which lies above a layer of insulation. The solar absorptance of the roof decreased to 0.38 from 0.75 after installation of the BIPV, lowering summertime daily mean roof upper surface temperatures by about 5 掳C. Summertime daily heat influx through the roof deck fell to 卤0.1 kWh/m2from 0.3-1.0 kWh/m2. However, summertime daily heat flux from the ventilated attic into the conditioned space was minimally affected by the BIPV, suggesting that the roof was decoupled from the conditioned space. Daily PV energy production was about 25% of building electrical energy use in the summer. For this building the primary benefit of the BIPV appeared to be its capacity to generate electricity and not its ability to reduce heat flows into the building. Building energy simulations were used to estimate the cooling energy savings and heating energy penalties for more typical buildings.

60

Energy Conservation Installation Credit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Conservation Installation Credit Energy Conservation Installation Credit Energy Conservation Installation Credit < Back Eligibility Multi-Family Residential Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate 500 per individual; up to 1,000 for a married couple filing jointly Program Info State Montana Program Type Personal Tax Credit Rebate Amount 25% of cost of capital investment Provider Montana Department of Revenue Individual taxpayers may claim a credit against their tax liability for up to 25% of the costs of investment for energy conservation purposes in a

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.  

SciTech Connect

Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

2011-12-01T23:59:59.000Z

62

File:Install.pdf | Open Energy Information  

Open Energy Info (EERE)

Install.pdf Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 脳 599 pixels. Other resolution: 464 脳 600 pixels. Full resolution 鈥(1,275 脳 1,650 pixels, file size: 86 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:48, 1 November 2012 Thumbnail for version as of 13:48, 1 November 2012 1,275 脳 1,650 (86 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Install.pdf&oldid=53281

63

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Brett C. Singer, William W. Delp, Michael G. Apte, Philip N. Price Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Berkeley, California, 94720 November 2011 Direct funding for this research was provided by the California Energy Commission through Contracts 500-05-026 and 500-08-061. Institutional support is provided to LBNL by the U.S. Department of Energy, Office of Science under Contract DE-AC02-05CH11231. LBNL-5265E-r1(3) Singer et al., Performance of Installed Cooking Exhaust Devices LBNL-5265E-r1(3) Performance of Installed Cooking Exhaust Devices Brett C. Singer 1

64

Structural Code Considerations for Solar Rooftop Installations.  

SciTech Connect

Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

2014-12-01T23:59:59.000Z

65

Cryogenic UHV installation for scanning tunneling microscopy  

Science Journals Connector (OSTI)

In this work we describe a helium cryostat with an ultrahigh vacuum chamber for placing the STM [H. By means of this installation it is possible to perform sample treatmentin situ (breaking, annealing, ion etchin...

V. S. Edelman; I. N. Khlyustikov

1996-01-01T23:59:59.000Z

66

Peoples Gas Single Family Direct Install (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

67

Kivalina wind generator  

SciTech Connect

The project reported was to construct a system to harness the winds of an Arctic site to generate electricity that would power a greenhouse where fruit and vegetables could be raised for local consumption. The installation of the tower and an Enertech 4K wind generator are described. (LEW)

Aldrich, D.

1984-02-18T23:59:59.000Z

68

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility  

SciTech Connect

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

Jack Q. Richardson

2012-06-28T23:59:59.000Z

69

Installed Geothermal Capacity/Data | Open Energy Information  

Open Energy Info (EERE)

Installed Geothermal Capacity/Data Installed Geothermal Capacity/Data < Installed Geothermal Capacity Jump to: navigation, search Download a CSV file of the table below: CSV FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate HeatRate WindTurbineManufacturer FacilityStatus Aidlin Geothermal Facility Geothermal Steam Power Plant Calpine Geysers Geothermal Area 20 MW20,000 kW 20,000,000 W 20,000,000,000 mW 0.02 GW 2.0e-5 TW 2 1989 Amedee Geothermal Facility Binary Cycle Power Plant Amedee Geothermal Venture Honey Lake, California 1.6 MW1,600 kW 1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW 2 1988 BLM Geothermal Facility Double Flash Coso Operating Co. Coso Junction, California, 90 MW90,000 kW 90,000,000 W

70

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Experimental Evaluation of Installed Cooking Exhaust Fan Performance Experimental Evaluation of Installed Cooking Exhaust Fan Performance Title Experimental Evaluation of Installed Cooking Exhaust Fan Performance Publication Type Report LBNL Report Number LBNL-4183E Year of Publication 2010 Authors Singer, Brett C., William W. Delp, and Michael G. Apte Publisher Lawrence Berkeley National Laboratory City Berkeley Keywords airflow & pollutant transport group, cooktop, energy analysis and environmental impacts department, gas burners, indoor air quality, indoor environment department, kitchen, nitrogen dioxide, oven, pollutant emissions, range hood, residential, source control, task ventilation, technology, sustainability and impact assessment group Abstract The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners. Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g. single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from <5% to roughly 100%) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

71

SunShot Initiative Installs Solar Energy System | Department...  

Office of Environmental Management (EM)

SunShot Initiative Installs Solar Energy System SunShot Initiative Installs Solar Energy System Addthis 1 of 10 SunShot Initiative team members install a solar energy system on a...

72

Alternative Fuels Data Center: Installation of Alternative Fuel Components  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installation of Installation of Alternative Fuel Components in Vehicles to someone by E-mail Share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Facebook Tweet about Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Twitter Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Google Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Delicious Rank Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Digg Find More places to share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on AddThis.com... More in this section... Federal

73

Utah Underground Storage Tank Installation Permit | Open Energy...  

Open Energy Info (EERE)

Underground Storage Tank Installation Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Utah Underground Storage Tank Installation Permit Form Type...

74

High-performance computer system installed at Los Alamos National...  

NLE Websites -- All DOE Office Websites (Extended Search)

High-performance computer system installed at Lab High-performance computer system installed at Los Alamos National Laboratory New high-performance computer system, called Wolf,...

75

Utility Scale Renewable Energy Development Near DOD Installations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility Utility Scale Renewable Energy Development Near DOD Installations:...

76

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations H2-Assisted NOx Traps: Test Cell Results Vehicle Installations 2003 DEER Conference Presentation: ArvinMeritor...

77

Obama Administration Announces Plans to Install New Solar Panels...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 -...

78

Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system  

SciTech Connect

This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage.

BOGER, R.M.

1999-05-12T23:59:59.000Z

79

HOCL Installation Guide Chen WANG, Thierry PRIOL  

E-Print Network (OSTI)

Chemical Language) is a chemical programming language. Compu- tations can be seen as chemical reactions which are controlled by a set of chemical rules. We have an HOCL compiler developed in JAVA. This manual shows you how to install Java SDK in your machine. HOCL compiler is developed under Java platform, so

Boyer, Edmond

80

Installing Small Wind Turbines Seminar and Workshop  

E-Print Network (OSTI)

Seminar and Workshop Installing Small Wind Turbines Seminar and Workshop Location: Murdoch January 2011 Details for Registration and Payment: Mr Daniel Jones, National Small Wind Turbine Test: The National Small Wind Turbine Centre at Murdoch University is holding a Small Wind Turbine short training

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Factors Affecting PMU Installation Costs (October 2014)  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy investigated the major cost factors that affected PMU installation costs for the synchrophasor projects funded through the Recovery Act Smart Grid Programs. The data was compiled through interviews with the nine projects that deployed production grade synchrophasor systems.

82

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

83

IEA HPP Annex 36 Installation/Quality  

E-Print Network (OSTI)

compiled and reviewed last week during meeting at EdF 10-11 October 2013 Submit final report to IEA HPP Ex#12;IEA HPP Annex 36 颅 Quality Installation/Quality Maintenance Van D. Baxter Oak Ridge National), USA 3 10-11 October 2013 EdF, France 4 12 May 2014 Workshop at IEA Heat Pump conference, Montreal

Oak Ridge National Laboratory

84

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Title Performance of Installed Cooking Exhaust Devices Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5265E Year of Publication 2012 Authors Singer, Brett C., William W. Delp, Michael G. Apte, and Phillip N. Price Journal Indoor Air Volume 22 Issue 3 Pagination 224-234 Date Published 06/2012 Keywords carbon monoxide, natural gas burners, nitrogen dioxide, range hood, task ventilation, unvented combustion, indoor environment group, Range Hood Test Facility Abstract The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) - including exhaust fan/microwave combination appliances - were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

85

Five Million Smart Meters Installed Nationwide is Just the Beginning of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Million Smart Meters Installed Nationwide is Just the Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress June 13, 2011 - 1:55pm Addthis A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We must have an efficient electricity infrastructure to compete in the global economy.

86

Five Million Smart Meters Installed Nationwide is Just the Beginning of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Million Smart Meters Installed Nationwide is Just the Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress June 13, 2011 - 1:55pm Addthis A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We must have an efficient electricity infrastructure to compete in the global economy.

87

Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates  

SciTech Connect

Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.

Ong, S.; Denholm, P.

2011-07-01T23:59:59.000Z

88

Shaft generator transmissions  

SciTech Connect

Economical on-board power can be generated from two-stroke, low-speed engines by installing a multistage hollow-shaft gearbox on the propeller intermediate shaft to drive the generator. Gearbox manufacturer Asug, based in Dessau, Germany, has designed units specifically for this purpose. The Asug shaft generator drive concept for generator drives at the front end of the engine is designed to reduce installation costs and uses an integrated engine-gearbox foundation. The complete propulsion system, consisting of the diesel engine, gear with coupling and generator, can be completely or partially preassembled outside the ship`s engine room to reduce onboard assembly time. A separate foundation for this arrangement is not necessary. The company offers a full range of gearboxes to generate power from 500 kW up to 5000 kW. Gearboxes driven from the forward engine end often incorporate an additional gear stage to gain energy from an exhaust turbine. This arrangement feeds part of the exhaust energy back into the system to increase efficiency. Latest installations of Asug shaft generator gears are in container ships and cargo/container ships built in Turkey and China.

NONE

1995-11-01T23:59:59.000Z

89

Hawaii Natural Energy Institute installs PV systems at public schools Pacific Business News  

E-Print Network (OSTI)

of the inverters, which convert direct current or DC power generated by the PV panels into alternating current in Ewa Beach and at Kawaikini New Century Public Charter School in Lihue on Kauai. "These installations the performance of traditional and emerging PV materials and inverter technologies," Institute Director Richard

90

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

91

Microsoft Word - CX-Ashe-CGSFiberInstallation_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Debbie Ruckwardt Electrical Engineer - TEP-CSB-1 Proposed Action: Installing fiber optic cables between Bonneville Power Administration's (BPA) Ashe Substation and Energy Northwest's Columbia Generating Station (CGS). Budget Information: Work Order # 00261540 PP&A Project No.: PP&A 1864 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project takes place between BPA's Ashe Substation and Energy Northwest's

92

Skutterudite Thermoelectric Generator For Automotive Waste Heat Recovery  

Energy.gov (U.S. Department of Energy (DOE))

Skutterudite TE modules were fabricated and assembled into prototype thermoelectric generators (TEGs), then installed on a standard GM production vehicle and tested for performance

93

Analysis of solar power generation on California turkey ranches.  

E-Print Network (OSTI)

??The objective of this thesis is to conduct a net present value analysis of installing a solar power generation system on company owned turkey grow (more)

Palermo, Rick

2009-01-01T23:59:59.000Z

94

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of 脗漏iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of 漏iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

95

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of 脗漏iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of 漏iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

96

Energy Department Launches SunShot Prize Competition to Install...  

NLE Websites -- All DOE Office Websites (Extended Search)

SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

97

Helping Ensure High-Quality Installation of Solar Power Technologies...  

Energy Savers (EERE)

Ensure High-Quality Installation of Solar Power Technologies Helping Ensure High-Quality Installation of Solar Power Technologies April 15, 2013 - 12:00am Addthis The Midwest...

98

Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Home Field Offices Welcome to the NNSA Production Office NPO News Releases Energy Saving "Cool Roofs" Installed at Y-12 Energy Saving "Cool Roofs" Installed at Y-12 The...

99

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

100

Performance of Installed Cooking Exhaust Devices  

SciTech Connect

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) including exhaust fan/microwave combination appliances were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Second generation heliostat. Final report  

SciTech Connect

The heliostat subsystem design is described. The test program is summarized, including component testing, subsystem operation at MDAC-Huntington Beach, and the shipment and installation at the Central Receiver Test Facility. The production heliostat description, the manufacturing process definitions, and the manufacturing facility definition are summarized. The installation, operations, and maintenance requirements for the 50 MWe field are summarized. Results are given of the cost analysis of the MDAC Second Generation Heliostat when produced at an annual rate of 50,000 units per year and installed and operated in a field of 5412 heliostats. Possible future development activities aimed at further cost reduction are discussed. (LEW)

Steinmeyer, D.A.

1981-04-01T23:59:59.000Z

102

RMP Standard PreInstalled Software Page 1 of 2  

E-Print Network (OSTI)

RMP Standard PreInstalled Software Page 1 of 2 Standard Software PreInstalled with RMP Windows@lmu.edu or 310-338-7777 RMP Standard PreInstalled Software Page 2 of 2 路 Photo Booth EndNote Apple DVD Player

Dahlquist, Kam D.

103

Small Wind Guidebook/Where Can I Find Installation and Maintenance Support  

Open Energy Info (EERE)

Where Can I Find Installation and Maintenance Support Where Can I Find Installation and Maintenance Support < Small Wind Guidebook Jump to: navigation, search Print PDF WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook Home WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical for Me? * What Size Wind Turbine Do I Need? * What Are the Basic Parts of a Small Wind Electric System? * What Do Wind Systems Cost? * Where Can I Find Installation and Maintenance Support? * How Much Energy Will My System Generate? * Is There Enough Wind on My Site? * How Do I Choose the Best Site for My Wind Turbine? * Can I Connect My System to the Utility Grid? * Can I Go Off-Grid? * State Information Portal * Glossary of Terms * For More Information

104

To Generate, or Not to Generate? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

To Generate, or Not to Generate? To Generate, or Not to Generate? To Generate, or Not to Generate? April 9, 2012 - 6:06pm Addthis Amanda McAlpin What could be more liberating than providing your own electricity, and not getting a bill each month? With a small renewable energy system, you can use alternative sources to create energy-maybe even enough to power your entire home. There are several options to choose from when considering a renewable energy system, such as solar electric systems, which can gather sun even from scattered areas. Solar electric systems can also be used as outdoor lighting. If this perks your interest, read considerations for installing a small solar electric system for a helpful list of questions to ask when selecting a qualified contractor to install one in your home.

105

To Generate, or Not to Generate? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

To Generate, or Not to Generate? To Generate, or Not to Generate? To Generate, or Not to Generate? April 9, 2012 - 6:06pm Addthis Amanda McAlpin What could be more liberating than providing your own electricity, and not getting a bill each month? With a small renewable energy system, you can use alternative sources to create energy-maybe even enough to power your entire home. There are several options to choose from when considering a renewable energy system, such as solar electric systems, which can gather sun even from scattered areas. Solar electric systems can also be used as outdoor lighting. If this perks your interest, read considerations for installing a small solar electric system for a helpful list of questions to ask when selecting a qualified contractor to install one in your home.

106

CNTA_Well_Installation_Report.book  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Security Administration Nuclear Security Administration Nevada Site Office Environmental Restoration Division Nevada Environmental Restoration Project Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye County, Nevada Revision No.: 0 January 2006 Approved for public release; further dissemination unlimited. DOE/NV--1102 Uncontrolled When Printed Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from:

107

Neutron scattering instrumentation at reactor based installations  

Science Journals Connector (OSTI)

During the past decade neutron scattering techniques have been applied to an increasingly wide range of scientific problems. Concurrently a number of substantial improvements of neutron scattering instrumentation have occurred to stimulate this trend. In this article several such developments which have occurred at reactor?based installations are described. Individual spectrometer components which are discussed in some detail include: neutron?optical devices such as guide tubes supermirrors and multilayer systems; neutronmonochromators with optimum reflectivity mosaic and focusing characteristics; position?sensitive detectors of several types; and equipment required for neutronpolarizationanalysis. Several novel spectrometers which have enhanced the role of neutron scattering during the past ten years are also described. These include spectrometers for small?angle scattering backscattering and neutron spin echo. An extensive bibliography is included which covers both early and more recent developments.

Roger Pynn

1984-01-01T23:59:59.000Z

108

Sleeve installations speed pipeline defect repair  

SciTech Connect

Repairing defects in pipelines can be a major challenge for pipeline companies or contractors. To reduce cost and eliminate unscheduled shut downs, pipeline operating companies have adopted ``in-service`` repair methods to restore overall integrity of the pipeline without taking it out of service. Interprovincial Pipe Line Co. has undertaken an aggressive approach to this ``in-service`` repair method by using a developed sleeving system for repairing leaking and non-leaking defects. A structural reinforcement sleeve consists of two non-fillet welded collars (one on each side of the defect) and a full encirclement sleeve welded on top of these collars. The annular space between the pipe and sleeve is filled with a hardenable, non-shrinking epoxy. Three different pressure vessel sleeves can be used for repairing certain defects. They can be used in combination with the pre-stressed sleeve or for independent repairs. This paper reviews the performance and installation of these sleeves.

Friedrich, J.; Smith, J.

1995-12-01T23:59:59.000Z

109

MagLab - Electrostatic Generator Tutorial  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrostatic Generator This is a Java tutorial, which requires that you have Java, a free software, installed on your computer. It works best if you have the latest version of...

110

Installation considerations for IGBT AC drives  

SciTech Connect

In the last four years, Adjustable Speed ac Drive (ASD) manufacturers have migrated from Bipolar Junction Transistor (BJT) semiconductors to Insulated Gate Bipolar Transistors (IGBTs) as the preferred Output switching device. The advantage of IGBTs over BJTs is that device rise and fall time switching capability is 5 - 10 times faster, resulting in lower device switching loss and a more efficient drive. However, for a similar motor cable length as the BJT drive, the faster output voltage risetime of the IGBT drive may increase the dielectric voltage stress on the motor and cable due to a phenomenon called reflected wave. Faster output dv/dt transitions of IGBT drives also increase the possibility for phenomenon such as increased Common Mode (CM) electrical noise, Electromagnetic Interference (EMI) problems and increased capacitive cable charging current problems. Also, recent experience suggests any Pulse Width Modulated (PWM) drive with a steep fronted output voltage wave form may increase motor shaft voltage and lead to a bearing current phenomenon known as fluting. This paper provides a basic understanding of these issues, as well as solutions, to insure a successful drive system installation.

Skibinski, G.L.

1997-06-01T23:59:59.000Z

111

Gasket and snap ring installation tool  

DOE Patents (OSTI)

A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

Southerland, Jr., James M. (Aiken, SC); Barringer, Jr., Curtis N. (Orangeburg, SC)

1994-01-01T23:59:59.000Z

112

The Economics of Steam Electric Generation  

E-Print Network (OSTI)

by manufacturers, data available from past installations and recent installations. 7) Labor costs were based on labor rates in ~he Lansing, Michigan area. 8) Power plant labor and supervision costs were based on manning data supplied by the Board of Water...-service. No other figures, including labor, fuel cost, outside services and other costs have been escalated. 12) Operating costs were established, based on steam generation. Credit has been allotted to any program for the electric power generated during...

Ophaug, R. A.; Birget, C. D.

1980-01-01T23:59:59.000Z

113

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

114

Installing and Maintaining a Small Wind Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System July 2, 2012 - 8:22pm Addthis Installing and Maintaining a Small Wind Electric System What does this mean for me? When installing a wind system, the location of the system, the energy budget for the site, the size of the system, and the height of the tower are important elements to consider. Deciding whether to connect the system to the electric grid or not is also an important decision. If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system

115

Solar Industry At Work: Streamlining Home Solar Installation | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Tillie Peterson works at Sunrun a home solar installation company based in San Francisco. As Director of Operations, Tillie works to get solar panels up and running for homeowners as simply and quickly as possible. Our Solar Industry At Work Series shares the personal success of

116

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

117

Spain Installed Wind Capacity Website | Open Energy Information  

Open Energy Info (EERE)

Spain Installed Wind Capacity Website Spain Installed Wind Capacity Website Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Spain_Installed_Wind_Capacity_Website&oldid=514562"

118

Property:Incentive/InstallReqs | Open Energy Information  

Open Energy Info (EERE)

InstallReqs InstallReqs Jump to: navigation, search Property Name Incentive/InstallReqs Property Type Text Description Installation Requirements. Pages using the property "Incentive/InstallReqs" Showing 25 pages using this property. (previous 25) (next 25) A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + Self-installed measures with a rebate level greater than $1,000 and all applications over $20,000, and 5% of remaining applicants will be inspected. Funds can be reserved for a period of 180 days as long as the application includes an expected date of project completion. Customer must have an active account in WV with either Wheeling Power Company, American Electric Power or Appalachian Power Company.

119

Rhode Island Stormwater Design and Installation Standards Manual (Rhode  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rhode Island Stormwater Design and Installation Standards Manual Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Rhode Island Program Type Environmental Regulations

120

DoD Energy Innovation on Military Installations  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

LPG Other Test Bed Focus 4 Smart Secure Installation Energy Management * Microgrids * Energy Storage * Ancillary Service Markets Efficient Integrated Buildings * Design,...

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

PNNL Reports Distributed Wind Installations Down, Exports Up...  

Energy Savers (EERE)

soon to be published by DOE's Pacific Northwest National Laboratory, U.S. wind turbines in distributed applications reached a cumulative installed capacity of 842 MW at...

122

High-performance computer system installed at Los Alamos National...  

NLE Websites -- All DOE Office Websites (Extended Search)

High-performance computer system installed at Los Alamos National Laboratory Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:January 2015 All...

123

Focus Series: Maine桼esidential Direct Install Program  

Energy.gov (U.S. Department of Energy (DOE))

Better Buildings Neighborhood Program Focus Series: Maine桼esidential Direct Install Program: Residential Air Sealing Program Drives Maine Home Energy Savings Through the Roof.

124

Install Waste Heat Recovery Systems for Fuel-Fired Furnaces  

Energy.gov (U.S. Department of Energy (DOE))

This tip sheet recommends installing waste heat recovery systems for fuel-fired furnaces to increase the energy efficiency of process heating systems.

125

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sam Crane August 28, 2003 H 2 -Assisted NOx Traps: Test Cell Results Vehicle Installations 2 Project Objectives * Determine Advantages of H 2 Assisted NO x Trap Regeneration *...

126

Installer Issues: Integrating Distributed Wind into Local Communities (Presentation)  

SciTech Connect

A presentation for the WindPower 2006 Conference in Pittsburgh, PA, regarding the issues facing installer of small wind electric systems.

Green, J.

2006-06-01T23:59:59.000Z

127

Reviewing Post-Installation and Annual Reports for Federal ESPC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Post-Installation and Annual Reports for Federal ESPC Projects The purpose of this document is to provide a framework for implementing uniform and consistent reviews of...

128

Project examples Install new HVAC, electrical, fire protection,  

E-Print Network (OSTI)

Project examples Install new HVAC, electrical, fire protection, and plumbing systems in Mechanical. 路 Totransformthisspaceandincreaseaccessibility, anelevatorisrequired.Currently,Blakelydoesnot haveone. Replace HVAC and electrical system

Blanchette, Robert A.

129

INSTALLATION, COMMISSIONING AND TROUBLE SHOOTING OF VARIABLE FREQUENCY DRIVE.  

E-Print Network (OSTI)

??In this thesis, the installation of variable frequency drive on board a ship is introduced briefly. In this particular study the variable frequency drive was (more)

Kuituniemi, Santtu

2013-01-01T23:59:59.000Z

130

DOE-DOD Emergency Backup Power Fuel Cell Installations  

Fuel Cell Technologies Publication and Product Library (EERE)

Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

131

NREL Job Task Analysis: Retrofit Installer Technician | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51671.pdf More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician (Revised) NREL Job Task Analysis: Energy Auditor trainingselfassessment.xlsx...

132

NREL Job Task Analysis: Retrofit Installer Technician (Revised...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

installerjta04112012.pdf More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Energy Auditor trainingselfassessment.xlsx...

133

Electrification of offshore petroleum installations with offshore wind integration  

Science Journals Connector (OSTI)

Electric power supply to oil and gas platforms is conventionally provided by gas turbines located on the platforms. As these gas turbines emit considerable amounts of CO2 and NOx, it is desirable to find alternative solutions. One alternative is to feed the platforms from the onshore power system via subsea power cables, which already have been implemented on some platforms in the Norwegian part of the North Sea. The paper studies a cluster of petroleum installations in this geographic area, connected to the Norwegian onshore power system through an HVDC voltage link. In the study, an offshore wind farm is also connected to the offshore AC power system. The main focus is investigation of transient stability in the offshore power system, and several fault cases have been studied for different levels of wind power generation. Simulations show that faults on the offshore converter platform can be critical due to the dependency of the reactive power delivered by the HVDC link to the offshore AC system. However, it is shown that local wind power production matching the offshore power demand will improve both voltage- and frequency-stability. Further on, it is indicated that offshore reactive power injections or alternative wind farm control topologies could improve voltage stability offshore.

Jorun I. Marvik; Eirik V. 貀sleb; Magnus Korp錽

2013-01-01T23:59:59.000Z

134

Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering?  

Office of Energy Efficiency and Renewable Energy (EERE)

What energy savings are realistically achievable by following quality installation standards for installation, operation, and maintenance of residential HVAC?

135

Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools  

SciTech Connect

This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

Coughlin, J.; Kandt, A.

2011-10-01T23:59:59.000Z

136

Wall Sculpture by Ellsworth Kelly Installed on Dartmouth Campus  

E-Print Network (OSTI)

Wall Sculpture by Ellsworth Kelly Installed on Dartmouth Campus Dartmouth Panels will be dedicated District, a wall sculpture by renowned abstract artist Ellsworth Kelly has been installed on the eastern fa莽ade of the Hopkins Center for the Arts, facing the Visual Arts Center. Kelly was in attendance

Shepherd, Simon

137

Net Zero Energy Military Installations: A Guide to  

E-Print Network (OSTI)

Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John;Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment .......................................................................................................................................1 1 Introduction: Net Zero Energy In DoD Context

138

Study Guide for Photovoltaic System Installers and Sample Examination Questions  

Energy.gov (U.S. Department of Energy (DOE))

This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help better prepare for the NABCEP PV installer examination but does not provide all of the information needed for completing the certification examination.

139

SynFlo: an interactive installation introducing synthetic biology concepts  

Science Journals Connector (OSTI)

SynFlo is an interactive installation that utilizes tangible interaction to help illustrate core concepts of synthetic biology through outreach programs. This playful installation allows users to create useful virtual life forms from standardized genetic ... Keywords: E. chromi, microsoft surface, sifteo cubes, synthetic biology, tangible user interfaces

Kimberly Chang; Wendy Xu; Nicole Francisco; Consuelo Valdes; Robert Kincaid; Orit Shaer

2012-11-01T23:59:59.000Z

140

Targeting Net Zero Energy for Military Installations (Presentation)  

SciTech Connect

Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Burman, K.

2012-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Lessons Learned During HVAC Installation Dept. of Computer Science  

E-Print Network (OSTI)

Lessons Learned During HVAC Installation Ian Watson AI-CBR Dept. of Computer Science University of HVAC equipment. It has been developed as an adjunct to an existing system that uses case-based reasoning to reuse previous HVAC installation specifications and designs. The system described lets

Watson, Ian

142

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations April 17, 2012 - 3:09pm Addthis On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters. For the event, Congresswoman Doris Matsui (D-Sacramento) visited SMUD's customer service center and praised the program for implementing a system "that will be more efficient, more reliable, and better for consumers." SMUD's meter installations are nearly complete, with only a few thousand remaining. In addition to smart meters, SMUD's grid modernization efforts will include automated distribution systems, a

143

Solar, Wind, Hydropower: Home Renewable Energy Installations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. Homeowner Andrea Mitchel, with installer Joe Guasti, proudly shows off small wind turbine installed in Oak Hills, CA. | Photo by Karin Sinclair, National Renewable Energy Laboratory.

144

V-053: Adobe Shockwave player installs Xtras without prompting | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Adobe Shockwave player installs Xtras without prompting 3: Adobe Shockwave player installs Xtras without prompting V-053: Adobe Shockwave player installs Xtras without prompting December 24, 2012 - 12:15am Addthis PROBLEM: Adobe Shockwave player installs Xtras without prompting PLATFORM: Adobe Shockwave Player ABSTRACT: A vulnerability was reported in Adobe Shockwave. REFERENCE LINKS: Vulnerability Note VU#519137 SecurityTracker Alert ID: 1027903 Bugtraq ID: 56972 CVE-2012-6271 IMPACT ASSESSMENT: Medium DISCUSSION: Adobe Shockwave Player through 11.6.8.638 allows remote attackers to trigger installation of arbitrary signed Xtras via a Shockwave movie that contains an Xtra URL, as demonstrated by a URL for an outdated Xtra. IMPACT: By convincing a user to view a specially crafted Shockwave content, an attacker may be able to execute arbitrary code with the privileges of the

145

Would You Consider Installing a Cool Roof? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? August 12, 2010 - 7:30am Addthis On Monday, Erin discussed cool roof technologies and how they can improve the comfort of buildings while reducing energy costs. Would you consider installing a cool roof? Why or why not? Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. Please comment with your answers, and also feel free to respond to other comments. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Would You Consider Driving a Vehicle that Can Run on Biodiesel? Would You Consider Installing a Cool Roof? Tips: Energy-Efficient Roofs How Do You Save Water When Caring for Your Lawn?

146

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be

147

Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Million Smart Grid Meters Installed Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid technology is speeding the modernization of the nation's electrical grid, helping to reduce the amount of time needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As a result of an unprecedented investment from the Recovery Act, smart

148

Scram signal generator  

DOE Patents (OSTI)

A scram signal generating circuit for nuclear reactor installations monitors a flow signal representing the flow rate of the liquid sodium coolant which is circulated through the reactor, and initiates reactor shutdown for a rapid variation in the flow signal, indicative of fuel motion. The scram signal generating circuit includes a long-term drift compensation circuit which processes the flow signal and generates an output signal representing the flow rate of the coolant. The output signal remains substantially unchanged for small variations in the flow signal, attributable to long term drift in the flow rate, but a rapid change in the flow signal, indicative of a fast flow variation, causes a corresponding change in the output signal. A comparator circuit compares the output signal with a reference signal, representing a given percentage of the steady state flow rate of the coolant, and generates a scram signal to initiate reactor shutdown when the output signal equals the reference signal.

Johanson, Edward W. (New Lenox, IL); Simms, Richard (Westmont, IL)

1981-01-01T23:59:59.000Z

149

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up AmaSeis  

E-Print Network (OSTI)

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up Ama the Arduino drivers. Take note of the assigned com port number, and set up AmaSeis to that number. 3. Some computers will require the following. Keep in mind, Arduino, does not need to run or be involved. You just

Barrash, Warren

150

Solar hot water system installed at Mobile, Alabama. Final report  

SciTech Connect

This final report describes the solar energy hot water system installed at LaQuinta Motor Inn Inc., at Mobile, Alabama. The building is a 122 unit motel. The system consists of six rows of ten collectors and three rows of eleven collectors (1990 square feet) mounted on the roof. Griswald flow control valves were installed to regulate the flow to each row. Two Heliotrope electronic thermometers with a combined capability of measuring the temperatures of 22 different locations were installed for monitoring purposes. Engineering drawings, component specifications, and operator instructions are included.

None

1980-10-01T23:59:59.000Z

151

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

152

Energy Department Completes Cool Roof Installation on DC Headquarters  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Cool Roof Installation on DC Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding the cool roof as part of the roof replacement project and it will save taxpayers $2,000 every year in building energy costs. Cool roofs use lighter-colored roofing surfaces or special coatings to reflect more of the sun's heat, helping improve building efficiency, reduce cooling costs and offset carbon emissions. The cool roof and increased insulation at the facility were

153

Energy Secretary Chu Announces Five Million Smart Meters Installed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Five Million Smart Meters Installed Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort June 13, 2011 - 12:00am Addthis Washington, DC - At a White House Grid Modernization event today, U.S. Department of Energy Secretary Steven Chu announced that more than five million smart meters have been installed nationwide as part of Recovery Act-funded efforts to accelerate modernization of the Nation's electric grid. Smart meters will provide utility companies with greater information about how much electricity is being used throughout their service areas. They will also give consumers access to real-time information about their energy consumption, allowing them to make well-informed decisions about how

154

Newly Installed Alaska North Slope Well Will Test Innovative Hydrate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newly Installed Alaska North Slope Well Will Test Innovative Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies May 17, 2011 - 1:00pm Addthis Washington, DC - A fully instrumented well that will test innovative technologies for producing methane gas from hydrate deposits has been safely installed on the North Slope of Alaska. As a result, the "I摹nik Sikumi" (I帽upiaq for "fire in the ice") gas hydrate field trial well will be available for field experiments as early as winter 2011-12. The well, the result of a partnership between ConocoPhillips and the Office of Fossil Energy's (FE) National Energy Technology Laboratory, will test a technology that involves injecting carbon dioxide (CO2) into sandstone

155

Property:Project Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Installed Capacity (MW) Installed Capacity (MW) Jump to: navigation, search Property Name Project Installed Capacity (MW) Property Type String Pages using the property "Project Installed Capacity (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 0 + MHK Projects/ADM 5 + 1 + MHK Projects/AWS II + 1 + MHK Projects/Admirality Inlet Tidal Energy Project + 22 + MHK Projects/Agucadoura + 2 + MHK Projects/Alaska 18 + 10 + MHK Projects/Alaska 36 + 10 + MHK Projects/Algiers Cutoff Project + 16 + MHK Projects/Algiers Light Project + 0 + MHK Projects/Anconia Point Project + 0 + MHK Projects/Ashley Point Project + 0 + MHK Projects/Astoria Tidal Energy + 300 + MHK Projects/Avondale Bend Project + 0 + MHK Projects/Bar Field Bend + 0 +

156

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

157

Portland Advancing Green Image With Solar Installs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

158

Home Solar Installations: Things to Consider | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

159

Property:EZFeed/InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name EZFeed/InstalledCapacity Property Type String Description EZFeed Installed Capacity property Subproperties This property has the following 6079 subproperties: 2 2003 Climate Change Fuel Cell Buy-Down Program (Federal) 3 30% Business Tax Credit for Solar (Vermont) 4 401 Certification (Vermont) A AEP (Central and North) - CitySmart Program (Texas) AEP (Central and North) - Residential Energy Efficiency Programs (Texas) AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) AEP Appalachian Power - Residential Home Retrofit Program (West Virginia)

160

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Carpe Diem: Install Insulated Roman Shades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades March 16, 2010 - 11:44am Addthis John Lippert As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows. I should have bought window quilts for all of our windows, but I refrained from doing so on two downstairs windows to save money (which, in the long run, I didn't). There were window shades already there; they didn't do much from a thermal perspective, but they did provide privacy and room darkening. Well, they need to be replaced now, and I'm looking again at high efficiency thermal window shades. This time I'm considering thermal Roman shades. About a dozen years ago my wife and I went on the Tour of Solar Homes, the local component of the annual National Solar Tour sponsored by the American

162

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marine Base Installs Solar Roofs Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

163

Home Solar Installations: Things to Consider | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

164

Defense Energy Support Center: Installation Energy Commodity Business Unit  

Energy.gov (U.S. Department of Energy (DOE))

Presentation梘iven at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting梔iscusses the Defense Energy Support Center's (DESC's) Installation Energy Commodity Business Unit (CBU) including its intent, commitment, pilot project, lessons learned, and impending barriers.

165

Microsoft Word - LSN_FiberInstall_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- TEP-TPP-4 Proposed Action: Lightspeed Network's Fiber Installation near Pilot Butte Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber...

166

Installing a Subsurface Drip Irrigation System for Row Crops  

E-Print Network (OSTI)

This publication describes the components of a subsurface drip irrigation system and the procedure for installing such a system. Each step is outlined and illustrated. Steps include tape injection, trenching, connecting drip lines, back-filling...

Enciso, Juan

2004-09-07T23:59:59.000Z

167

Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry  

E-Print Network (OSTI)

This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex...

Weaver, Timothy A.

2010-07-14T23:59:59.000Z

168

North Shore Gas Single Family Direct Install (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

169

Construction and installation of public comfort art : "Art as sanctuary"  

E-Print Network (OSTI)

This paper illustrates the construction and installation of a public piece of art, hidden within which is an enclosed and private meditation space. In making the piece, the artist was influenced by the works of others as ...

Longo, Sheila A. (Sheila Ann)

2005-01-01T23:59:59.000Z

170

Gamesa Installs 2-MW Wind Turbine at NWTC  

Energy.gov (U.S. Department of Energy (DOE))

In October, the Department of Energy (DOE) National Renewable Laboratory (NREL) worked with Gamesa Wind US to complete the installation of Gamesa's G97-2 MW Class IIIA turbine at NREL's National Wind Technology Center.

171

Capturing and Applying Lessons Learned During Engineering Equipment Installation  

Science Journals Connector (OSTI)

This paper describes the implementation of a knowledge management tool to capture and reuse the lessons learned from the installation of engineering equipment. It has been developed as an adjunct to an existin...

Ian Watson

2004-01-01T23:59:59.000Z

172

Capturing and Applying Lessons Learned During Engineering Equipment Installation  

Science Journals Connector (OSTI)

This paper describes the implementation of a knowledge management tool to capture and reuse the lessons learned from the installation of engineering equipment. It has been developed as an adjunct to an exist-i...

Ian Watson

2004-01-01T23:59:59.000Z

173

Consider Installing a Condensing Economizer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a Condensing Economizer Consider Installing a Condensing Economizer This tip sheet summarizes the benefits of condensing economizers and is part of a series of tip sheets on how to...

174

Design and Installation of a Disposal Cell Cover Field Test ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

through March 3, 2011, Phoenix, Arizona. C.H. Benson, W.J. Waugh, W.H. Albright, G.M. Smith, R.P. Bush Design and Installation of a Disposal Cell Cover Field Test More Documents...

175

Vet's company installing solar across Massachusetts | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts February 25, 2010 - 4:09pm Addthis Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010. The small company recently reached a significant milestone - it was awarded one of the largest solar contracts in Massachusetts. Dan served in the military for seven years, reaching the rank of captain in the Army. He says his idea for a clean energy company came in 2005 when he was pursuing his M.B.A while serving in Kuwait. "For my final project, I wrote a business plan for a clean energy

176

Portland Advancing Green Image With Solar Installs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

177

Net Zero Energy Military Installations: A Guide to Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations. 48876.pdf More...

178

Installation of a high-precision Kirsten Hacker  

E-Print Network (OSTI)

Installation of a high-precision BPM in BC3 Kirsten Hacker 20-03-07 #12;BPM installed in BC2=T3*c dE/E=D/R16 EBPM T1 T2 T3 ~300mm 3um position resolution -> 1e-5 Energy resoution!!! BPM BPM #12;BPM for the Bunch Compressors beam stripline vacuumstripline vacuumStripline Vacuum Beam beam tapering

179

Diophantine Generation,  

E-Print Network (OSTI)

Diophantine Generation, Horizontal and Vertical Problems, and the Weak Vertical Method Alexandra Shlapentokh Diophantine Sets, Definitions and Generation Diophantine Sets Diophantine Generation Properties of Diophantine Generation Diophantine Family of Z Diophantine Family of a Polynomial Ring Going Down Horizontal

Shlapentokh, Alexandra

180

Investigating the option of installing small scale \\{PVs\\} on facility rooftops in a green supply chain  

Science Journals Connector (OSTI)

Abstract Industry practitioners and policy makers are under increasing pressure to promote green supply chains through the integration of renewable energy sources. Changing facilities from net energy users to net energy producers is a major concern for supply chain managers who are interested in greening their business. Building integrated photovoltaics (BIPV) is an innovative design idea to achieve energy positive buildings. In a BIPV building, photovoltaic (PV) arrays are integrated into the structure of the building in order to transform the incident solar radiation to clean energy that can be used in facility operations. This option is dependent on the economic attractiveness of the solar PVs, which, in return, depends on the policies (incentives, subsidies, feed-in tariff) in effect at the facility location, the efficiency of the \\{PVs\\} installed, and the amount of incident solar radiation at the facility location. We present an economic model that calculates the cost per kWh capacity of solar \\{PVs\\} installed and then integrate the decision of installing \\{PVs\\} of different sizes on the facility rooftops of a supply chain subject to the different environmental policies available. We study the implications of our model based on a sensitivity analysis for different carbon credit prices, PV generation costs, and feed-in tariff prices.

Tarek Abdallah; Ali Diabat; Jasper Rigter

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

New England Breeze Solar and Wind Installers | Open Energy Information  

Open Energy Info (EERE)

Breeze Solar and Wind Installers Breeze Solar and Wind Installers Jump to: navigation, search Logo: New England Breeze Solar and Wind Installers Name New England Breeze Solar and Wind Installers Place Hudson, Massachusetts Zip 01749 Sector Renewable energy, Services, Solar, Wind energy Product Solar Panel and Wind Turbine Installation Year founded 2006 Number of employees 1-10 Phone number 978-567-9463 Website http://www.NewEnglandBreeze.co Coordinates 42.3917598掳, -71.5661769掳 Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.3917598,"lon":-71.5661769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

182

Stakeholder Engagement and Outreach: U.S. Installed Wind Capacity  

Wind Powering America (EERE)

Education Education Printable Version Bookmark and Share Learn About Wind About Wind Power Locating Wind Power Getting Wind Power Installed Wind Capacity Wind for Schools Project Collegiate Wind Competition School Project Locations Education & Training Programs Curricula & Teaching Materials Resources Installed Wind Capacity This page has maps of the United States that show installed wind capacity by state and its progression. This map shows the installed wind capacity in megawatts. As of September 30, 2012, 51,630 MW have been installed. Alaska, 16 MW; Hawaii, 112 MW; Washington, 2,699 MW; Oregon, 3,153 MW; California, 4,570 MW; Nevada, 152; Idaho, 675 MW; Utah, 325 MW; Arizona, 238 MW; Montana, 395 MW; Wyoming, 1,410 MW; Colorado, 1,805 MW; New Mexico, 778 MW; North Dakota, 1,469 MW; South Dakota, 784 MW; Nebraska, 337 MW; Kansas, 1,877 MW; Oklahoma, 2,400 MW; Texas, 10,929 MW; Minnesota, 2,717 MW; Iowa, 4,536 MW; Missouri, 459 MW; Wisconsin, 636 MW; Illinois, 3,055 MW; Tennessee, 29 MW; Michigan, 515 MW; Indiana, 1,343 MW; Ohio, 420 MW; West Virginia, 583 MW; Pennsylvania, 1,029 MW; Maryland, 120 MW; Delaware, 2 MW; New Jersey, 9 MW; New York, 1,418 MW; Vermont, 46 MW; New Hampshire, 125 MW; Massachusetts, 64 MW; Rhode Island, 3 MW; Maine, 397 MW.

183

Installing and Operating an Efficient Swimming Pool Pump | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump May 29, 2012 - 7:54pm Addthis Photo courtesy iStockphoto.com Photo courtesy iStockphoto.com What does this mean for me? Use the smallest size pump possible for your swimming pool. Reduce the time your pool pump operates to save money while still keeping your pool clean. You can save energy and maintain a comfortable swimming pool temperature by using a smaller, higher efficiency pump and by operating it less. In a study of 120 pools by the Center for Energy Conservation at Florida Atlantic University, some pool owners saved as much as 75% of their original pumping bill when they used these energy conservation measures (see table below). Table 1. Savings from Pump Conservation Measures

184

Installing a Light Source 'Racetrack' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

185

Nevada manufacturer installing geothermal power plant | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant August 26, 2010 - 4:45pm Addthis Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Joshua DeLung Chemetall supplies materials for lithium-ion batteries for electric vehicles $28.4 million in Recovery Act funding going toward geothermal plant Plant expected to produce 4 MW of electrical power, employ 25 full-time workers Chemetall produces lithium carbonate to customers in a wide range of industries, including for batteries used in electric vehicles, and now the

186

NSTAR (Electric) - Small Business Direct Install Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program < Back Eligibility Commercial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Up to 70% of the total project cost Provider NSTAR The NSTAR Small Business Solutions Program offers incentives for business customers whose average monthly demand is 300 kW or less. The first step of the program is a free energy audit to identify potential energy saving

187

Ohio Town Installing 'Green' Traffic Signals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals January 20, 2010 - 3:57pm Addthis Elyria, Ohio, is getting a little greener. Mayor William M. Grace recently confirmed that staff will replace traditional traffic lights with 288 energy-efficient LEDs (light-emitting diodes), saving the town energy and money. "We are definitely doing this, we are going to switch out all the traffic lights in town," Elyria's mayor says. Replacing light bulbs with LEDs will mean substantial savings. That's because these small, solid bulbs can last up to 10 times longer than traditional lights and require considerably less energy. "This gives us the opportunity to change, we expect to realize considerable savings," the mayor says.

188

Installing a Light Source 'Racetrack' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

189

NREL: Technology Transfer - White Earth Nation Installs Turbines: A Wind  

NLE Websites -- All DOE Office Websites (Extended Search)

White Earth Nation Installs Turbines: A Wind Powering America Success Story White Earth Nation Installs Turbines: A Wind Powering America Success Story February 11, 2013 Almost 8 years after taking the initial steps to harness the wind, the White Earth Nation recently completed the installation of two small wind turbines that will help offset energy costs for Minnesota's largest and most populous Native American reservation. Mike Triplett, economic development planner with the White Earth Development Office, believes that the project represents a unique opportunity for tribal entities in the United States. He noted that tribes don't qualify for tax-based incentives. "And as for working with investors, we never found that to be a viable option," Triplett said. "So we've relied heavily on grants." Funded through nearly $1.8 million in congressional appropriations along

190

Install renewable energy systems | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Install renewable energy systems Install renewable energy systems Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach Install renewable energy systems

191

Light weight underground pipe or cable installing device  

SciTech Connect

This invention pertains to a light weight underground pipe or cable installing device adapted for use in a narrow and deep operating trench. More particularly this underground pipe installing device employs a pair of laterally movable gates positioned adjacent the bottom of the operating trench where the earth is more solid to securely clamp the device in the operating trench to enable it to withstand the forces exerted as the actuating rod is forced through the earth from the so-called operating trench to the target trench. To accommodate the laterally movable gates positioned adjacent the bottom of the narrow pipe installing device, a pair of top operated double-acting rod clamping jaws, operated by a hydraulic cylinder positioned above the actuating rod are employed.

Schosek, W. O.

1985-01-08T23:59:59.000Z

192

Pasadena Water and Power - Solar Power Installation Rebate | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate < Back Eligibility Commercial Institutional Local Government Nonprofit Residential State Government Savings Category Solar Buying & Making Electricity Program Info State California Program Type Utility Rebate Program Rebate Amount Systems up to 30 kW have the option of receiving an expected performance based buydown (EPBB) or a performance based incentive (PBI). Systems larger than 30 kW are only eligible for the PBI. EPBB (effective 6/1/12): Residential: $1.40/watt AC Commercial and all PPAs: $0.85/watt AC Non-profits and Government: $1.60/watt AC Income-qualified residential: $4.00/watt PBI (effective 6/1/12): Residential: $0.212/kWh Commercial and all PPAs: $0.129/kWh

193

Purchase and Installation of a Geothermal Power Plant to Generate Electricity Using Geothermal Water Resources  

Energy.gov (U.S. Department of Energy (DOE))

Project objectives: Demonstrate technical and financial feasibility of the use of an existing low-temperature geothermal resource for combined heat and power; and Maintain and enhance existing geothermal district heating operation.

194

Cold Vacuum Drying (CVD) Facility Diesel Generator Fire Protection  

SciTech Connect

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Fire Protection and Detection System installed by Project W-441 (Cold Vacuum Drying Facility and Diesel Generator Building) functions as required by project specifications.

SINGH, G.

2000-04-25T23:59:59.000Z

195

Gasifier-based power generation: Technology and economics  

Science Journals Connector (OSTI)

The paper describes a 100 kW power generation system installed at Port Blair, Andaman and Nicobar Islands, under a project sponsored by the Department of Non-Conventional Energy Sources, Government of India. The ...

B N Baliga; S Dasappa; U Shrinivasa; H S Mukunda

1993-03-01T23:59:59.000Z

196

Maine: Energy Efficiency Program Helps Generate Town's Electricity  

Office of Energy Efficiency and Renewable Energy (EERE)

Energy Efficiency program helps municipalities with their energy bills. Thomaston, Maine, was able to install solar panels to generate 13% of the electricity used by the wastewater treatment facility.

197

Use of third-generation biofuels in self-contained power generation systems based on contemporary steam piston engines  

Science Journals Connector (OSTI)

An alternative concept is studied for third-generation biofuel production and use in low capacity self-contained cogeneration installations, making it possible to optimize the whole production cycle for conver...

V. G. Sister; E. M. Ivannikova; A. I. Yamchuk

2013-07-01T23:59:59.000Z

198

Weight and power optimization of steam bottoming cycle for offshore oil and gas installations  

Science Journals Connector (OSTI)

Abstract Offshore oil and gas installations are mostly powered by simple cycle gas turbines. To increase the efficiency, a steam bottoming cycle could be added to the gas turbine. One of the keys to the implementation of combined cycles on offshore oil and gas installations is for the steam cycle to have a low weight-to-power ratio. In this work, a detailed combined cycle model and numerical optimization tools were used to develop designs with minimum weight-to-power ratio. Within the work, single-objective optimization was first used to determine the solution with minimum weight-to-power ratio, then multi-objective optimization was applied to identify the Pareto frontier of solutions with maximum power and minimum weight. The optimized solution had process variables leading to a lower weight of the heat recovery steam generator while allowing for a larger steam turbine and condenser to achieve a higher steam cycle power output than the reference cycle. For the multi-objective optimization, the designs on the Pareto front with a weight-to-power ratio lower than in the reference cycle showed a high heat recovery steam generator gas-side pressure drop and a low condenser pressure.

Lars O. Nord; Emanuele Martelli; Olav Bolland

2014-01-01T23:59:59.000Z

199

Automated solar collector installation design including ability to define heterogeneous design preferences  

DOE Patents (OSTI)

Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre -defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

2014-04-29T23:59:59.000Z

200

Automated solar collector installation design including ability to define heterogeneous design preferences  

DOE Patents (OSTI)

Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Embodiments may also include definition of one or more design apertures, each of which may correspond to boundaries in which solar collector layouts should comply with distinct sets of user-defined design preferences. Distinct apertures may provide heterogeneous regions of collector layout according to the user-defined design preferences.

Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

2013-01-08T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Systems study of drilling for installation of geothermal heat pumps  

SciTech Connect

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

1997-09-01T23:59:59.000Z

202

RFAR installation for Buildings 703, 712, 747, 748 and 1163  

SciTech Connect

This document is to certify the installation and testing of the Radio Fire Alarm Reporting box (RFAR). The Hanford Fire Dept. will be notified of troubles via RFAR. The document outlines prerequisites, necessary equipment, and the fire alarm system test to insure the system is operating correctly.

Ferry, M.

1995-12-31T23:59:59.000Z

203

Sun N1 Grid Engine 6.1 Installation Guide  

E-Print Network (OSTI)

Sun N1 Grid Engine 6.1 Installation Guide Sun Microsystems, Inc. 4150 Network Circle Santa Clara, CA 95054 U.S.A. Part No: 820颅0697 May 2007 #12;Copyright 2007 Sun Microsystems, Inc. 4150 Network Circle, Santa Clara, CA 95054 U.S.A. All rights reserved. Sun Microsystems, Inc. has intellectual

204

Decidability Results for Dynamic Installation of Compensation Handlers  

E-Print Network (OSTI)

that in a simple -like calculus with static compen- sations the termination of a process is decidable Zavattaro Focus Team, University of Bologna & INRIA, Italy Abstract. Dynamic compensation installation compensations, showing that process termination is decidable for parallel and replacing compensations while

Paris-Sud XI, Universit茅 de

205

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications  

SciTech Connect

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

2009-09-01T23:59:59.000Z

206

1. Generation 1 1. Generation  

E-Print Network (OSTI)

1. Generation 1 _________________________________________________________________________ 1. Generation Sound and vibrations or, in more general terms, oscillations of matter (solids or fluids) are generated in many different dynamic processes. The basic mechanisms which underlie these oscillations

Berlin,Technische Universit盲t

207

FORSCOM installation characterization and ranking for water efficiency improvement  

SciTech Connect

On March 11, 1994, President Clinton signed Executive Order 12902-Energy Efficiency and Water Conservation at Federal Facilities. Section 302 of the Executive Order calls for energy and water prioritization surveys of federal facilities to be conducted. The surveys will be used to establish priorities for conducting comprehensive facility audits. In response to the requirements of the Executive Order, the U.S. Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) to initiate a broad study of the water savings potential at each of its major installations. This report provides an assessment of the water, sewer, energy (for hot water production and pumping), and associated cost savings potential at ten of the major FORSCOM installations. This assessment is meant to be a {open_quotes}first pass{close_quotes} estimate of the water savings potential, to assist FORSCOM in prioritizing installations for detailed water audits and potential water efficient retrofits. In addition, the end uses (toilets, sinks, showerheads, irrigation, etc.) with the greatest water savings potential are identified at each installation. This report is organized in the following manner. Following this Introduction, Section 2 provides important background information pertaining to the water analysis. Section 3 describes the methodology employed in the analysis, and Section 4 summarizes the study results. Section 5 prioritizes the installations based on both water/sewer savings and cost associated with water, sewer, and energy savings. Section 6 provides recommendations on where to start detailed water audits, as well as other recommendations. References are listed in Section 7. The appendices provide specific information on the analysis results and methodology, along with a discussion of special issues.

Fitzpatrick, Q.K.; McMordie, K.L.; Di Massa, F.V. [and others

1995-05-01T23:59:59.000Z

208

EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development  

Energy.gov (U.S. Department of Energy (DOE))

Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

209

Pantex installs new high explosives equipment | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

210

Microsoft Word - Final_NineCanyon_CommunicationTowerInstall_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kelly Gardner, PMP Project Manager, TEP-TPP-1 Proposed Action: Nine Canyon Substation Communication Tower Addition: 331800 McNary Sub Bus Tie Relay Replacements and 310427 McNary-Badger Canyon Transfer Trip Install Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and modifications to transmission facilities Location: Kennewick, Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a 60-foot communications tower and associated communication equipment at the Benton County Public Utility District's Nine Canyon Substation in Benton County, Washington. The upgrade would involve replacing the

211

Pantex installs new high explosives equipment | National Nuclear Security  

National Nuclear Security Administration (NNSA)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

212

Idaho National Engineering Laboratory installation roadmap document. Revision 1  

SciTech Connect

The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

Not Available

1993-05-30T23:59:59.000Z

213

Safety assessment of discharge chute isolation barrier preparation and installation  

SciTech Connect

This analysis examines activities associated with the installation of isolation barriers in the K Basins at the Hanford Reservation. This revision adds evaluation of barrier drops on stored fuel and basin floor, identifies fuel which will be moved and addresses criticality issues with sludge. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

Meichle, R.H.

1994-10-21T23:59:59.000Z

214

Site selection for the installation of autonomous desalination systems (ADS)  

Science Journals Connector (OSTI)

The geographic location of a final site where an ADS unit can be installed has a strong influence on the success of that project. If the desalination unit is not located in the most favorable position, the competitive advantages of the process can be wiped out. Considerable care must be exercised in selecting the unit site, and many different factors must be considered. The aim of this work is to present amethodology to identify and select themost favorable sites to install ADS units. Collection of the basic data and evaluation are the essential steps for the identification of sites. The favorable sites can be screened based on the criteria developed in this work for the purpose of selecting the best apparent site. Scoring of the various criteria, when combined with the weighting system, establishes an overall ranked score for each site. A detailed description of the selection methodology will be presented.

F. Banat; V. Subiela; H. Qiblawey

2007-01-01T23:59:59.000Z

215

Interface and installation guide: SAFT-UT utilities  

SciTech Connect

This document is one in a set of three reference documents pertaining to the SAFT-UT Utilities. The GUIDE TO SAFT-UT PRINCIPLES AND CONVENTIONS provides the user with an overall background for practical implementation of SAFT-UT and the associated software utilities. The REFERENCE MANUAL describes in detail each utility available to the user. This document, the INTERFACE AND INSTALLATION GUIDE, describes the steps necessary to install the SAFT utilities and Real-Time Processor on a VAX class computer running the VMS operating system. It also describes in detail the method for adaptation of user data files and the user's data collection system to the SAFT-UT Utility set.

Hall, T.E.

1987-10-01T23:59:59.000Z

216

Distributed Generation  

NLE Websites -- All DOE Office Websites (Extended Search)

Untapped Value of Backup Generation Untapped Value of Backup Generation While new guidelines and regulations such as IEEE (Institute of Electrical and Electronics Engineers) 1547 have come a long way in addressing interconnection standards for distributed generation, utilities have largely overlooked the untapped potential of these resources. Under certain conditions, these units (primarily backup generators) represent a significant source of power that can deliver utility services at lower costs than traditional centralized solutions. These backup generators exist today in large numbers and provide utilities with another option to reduce peak load, relieve transmission congestion, and improve power reliability. Backup generation is widely deployed across the United States. Carnegie Mellon's Electricity

217

New BPM installed in BC2 Jan Hauschildt  

E-Print Network (OSTI)

New BPM installed in BC2 Compact! Thanks to: Jan Hauschildt Dirk Noelle Silke Vilcins Holger 30 40 time (ns) Volts chicane BPM scope traces for 12-16 MV/m gradient Scope in tunnel ~ 150 um resolution => 5*10-4 resolution #12;-20 -15 -10 -5 0 0.9 1 1.1 1.2 1.3 1.4 1.5 BPM slope phase (deg

218

Open PV Project: Unlocking PV Installation Data (Brochure)  

SciTech Connect

This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

Not Available

2012-04-01T23:59:59.000Z

219

CSP'960H/CSP-960S Installation Guide  

E-Print Network (OSTI)

CSP'960H/CSP-960S Installation Guide 4-634-979-01 TM Read First! 1^00 - 3lG - 755; #12;CSP-960H/CSP CSP-960H only) J Sony CDU926S CD-R Drive Unit User's Guide Use this manual as a guide to help you. If all the items are not found, please contact your Sony dealer before proceeding. G CSP-960H/960S CD

Kleinfeld, David

220

Solar heating system installed at Jackson, Tennessee. Final report  

SciTech Connect

The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

None

1980-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Design and installation manual for thermal energy storage  

SciTech Connect

The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

1980-01-01T23:59:59.000Z

222

Empirically Derived Strength of Residential Roof Structures for Solar Installations.  

SciTech Connect

Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

Dwyer, Stephen F.; Sanchez, Alfred; Campos, Ivan A.; Gerstle, Walter H.

2014-12-01T23:59:59.000Z

223

Install the E-print Network toolbar -- Energy, science, and technology for  

Office of Scientific and Technical Information (OSTI)

Browser Toolbar The E-print Network offers a browser toolbar for easy access to e-print searches and discipline pages. EPN browser toolbar Two installation options are available for the EPN browser toolbar: Internet Explorer - Download and install the toolbar using the Softomate ActiveX Web installer Please select "Install ActiveX Control" when prompted by your browser. Install toolbar for Internet Explorer Can't see the toolbar after installing? Note: Browser security settings at some organizations may prevent installation or use of the toolbar in Internet Explorer. Try installing the toolbar in the FireFox browser, using the button below. Minimum System Requirements: Windows XP/Vista Internet Explorer 6 or Firefox 2 FireFox - Install toolbar for FireFox

224

Next-Generation Solar Collectors for CSP  

Energy.gov (U.S. Department of Energy (DOE))

This fact sheet on Next-Generation Collectors for CSP highlights a solar energy program awarded through the 2012 SunShot Concentrating Solar Power R&D awards. The team is developing new solar collector base technologies for next-generation heliostats used in power tower systems. If successful, this project will result in a 50% reduction in solar field equipment cost and a 30% reduction in field installation cost compared to existing heliostat designs.

225

Generation Planning (pbl/generation)  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Generation Planning Thumbnail image of BPA White Book BPA White Book (1998 - 2011) Draft Dry...

226

Oil/gas separator for installation at burning wells  

DOE Patents (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

1993-03-09T23:59:59.000Z

227

Oil/gas separator for installation at burning wells  

SciTech Connect

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait`s oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R. [and others

1991-12-31T23:59:59.000Z

228

Fact #643: October 4, 2010 Four Cylinder Engine Installations Continue to Rise  

Energy.gov (U.S. Department of Energy (DOE))

The share of 4 cylinder engines installed in light vehicles has been increasing since 2004. Beginning in 2006, cars have shown an increase in 4 cylinder engine installations while 8 cylinder engine...

229

Simulating environmental changes due to marine hydrokinetic energy installations.  

SciTech Connect

Marine hydrokinetic (MHK) projects will extract energy from ocean currents and tides, thereby altering water velocities and currents in the site's waterway. These hydrodynamics changes can potentially affect the ecosystem, both near the MHK installation and in surrounding (i.e., far field) regions. In both marine and freshwater environments, devices will remove energy (momentum) from the system, potentially altering water quality and sediment dynamics. In estuaries, tidal ranges and residence times could change (either increasing or decreasing depending on system flow properties and where the effects are being measured). Effects will be proportional to the number and size of structures installed, with large MHK projects having the greatest potential effects and requiring the most in-depth analyses. This work implements modification to an existing flow, sediment dynamics, and water-quality code (SNL-EFDC) to qualify, quantify, and visualize the influence of MHK-device momentum/energy extraction at a representative site. New algorithms simulate changes to system fluid dynamics due to removal of momentum and reflect commensurate changes in turbulent kinetic energy and its dissipation rate. A generic model is developed to demonstrate corresponding changes to erosion, sediment dynamics, and water quality. Also, bed-slope effects on sediment erosion and bedload velocity are incorporated to better understand scour potential.

Jones, Craig A. (Sea Engineering Inc., Santa Cruz, CA); James, Scott Carlton; Roberts, Jesse Daniel (Sandia National Laboratories, Albuquerque, NM); Seetho, Eddy

2010-08-01T23:59:59.000Z

230

Troll Phase 1, installation of large spools before pipelay  

SciTech Connect

Development of the Troll Phase 1 project required landfall--towards a gas conditioning plant on the Norwegian west coast--of both 36-in. wet gas fed (or import) pipelines and 40-inch dry gas export pipelines. The very uneven seabed necessitated both the driving of a 3.5 km long subsea tunnel system and extensive route preparations. The lateral separation of 142 to 163 m between subsea tunnel pipeline risers and offshore pipeline laydown was bridged by fabricating four large--147 to 186 tons--spools. These spools were installed gas-filled in unique single lifts using special sea fastening and guidance systems. The odd-shaped 3-D spool configurations were fabricated to match an extensively prepared seabed. The spools were installed after tunnel pipeline riser completion but before pipeline laydown to minimize the duration of underwater activities late in the season. Special support structures were fabricated to support hyperbaric welding and pipeline laydown operations. Accurate pipeline laydown facilitated simple and quick lift, shift and alignment operations, and all (seven) automated hyperbaric welds with the Pipeline Repair Systems (PRS) were completed on schedule without the use of pup-pieces. Diver support during these activities constituted a significant operation in itself.

Buchan, S. [Rockwater AS, Stavanger (Norway); Kuhlmann, J.H. [A/S Norske Shell, Bergen (Norway)

1996-12-01T23:59:59.000Z

231

Residential Windows and Window Coverings: A Detailed View of the Installed Base and User Behavior  

Energy.gov (U.S. Department of Energy (DOE))

Includes information about the installed base of residential windows and window coverings, and the operation of window coverings by households.

232

annual generation | OpenEI  

Open Energy Info (EERE)

generation generation Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments Login or register to post comments

233

Installation and Instrumentation of a Micro-CHP Demonstration Facility.  

E-Print Network (OSTI)

??Micro-Cooling, Heating and Power (CHP) is the decentralized generation of electricity in which normally wasted heat is recovered for use in heating and cooling of (more)

Stone, Nicholas Alexander

2006-01-01T23:59:59.000Z

234

Measuring the Impact of Tidal Power Installations on Endangered...  

Office of Environmental Management (EM)

innovative technologies for clean, domestic power generation from resources such as hydropower, waves, and tides. Addthis Related Articles Portland Company to Receive 1.3 Million...

235

Tracking the Sun VII: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2013  

SciTech Connect

As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the cost and price of these systems. This report helps to fill this need by summarizing trends in the installed price of grid-connected PV systems in the United States from 1998 through 2013, with partial data for the first half of 2014. The analysis is based on project-level data for more than 300,000 individual residential, commercial, and utility-scale PV systems installed across 33 states and representing 80% of all grid-connected PV capacity installed in the United States through 2013. It is essential to note at the outset what the data presented within this report represent. First, the data consist of prices paid to project developers or installers (prior to receipt of any incentives), and for a variety of reasons, those prices may differ from the underlying costs borne by project developers/installers. Second, the data are historical, focusing primarily on projects installed through the end of 2013, and therefore do not reflect the price of projects installed more recently (with the exception of the limited set of results presented for systems installed in the first half of 2014); nor are the data indicative of prices currently being quoted for prospective projects to be installed at a later date. For these reasons and others, the results presented in this report may differ from current PV price or cost benchmarks. Third, by focusing on the up-front price paid by the PV system owner prior, the report does not capture trends associated with PV performance or other factors that impact the levelized cost of electricity for PV. Finally, the underlying data collected for this report include third party owned (TPO) projects where either the system is leased to the site-host or the generation output is sold to the site-host under a power purchase agreement. For a subset of TPO systems, the installed price data represent appraised values rather than transaction prices, and those projects were removed from the data sample in order to eliminate any associated bias. The report presents one set of installed price trends for residential and commercial PV systems, and another set for utility-scale PV. In all cases, installed prices are identified in terms of real 2013 dollars per installed watt (DC-STC), prior to receipt of any direct financial incentives or tax credits. This report separately summarizes installed price data for utility-scale PV projects, drawing upon data also presented in LBNL抯 companion report, Utility Scale Solar 2013: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States. For our purposes, utility-scale PV is defined to consist of ground-mounted projects larger than 5 MW. The sample of installed price data includes 97 projects with commercial operation dates spanning the period 2007- 2013. Several important features of the utility-scale data are worth noting, in addition to those noted earlier for the dataset as a whole. First, the sample includes only fully operational projects for which all individual phases are in operation and treats all phases as a single project with a commercial operation date based on the final phase. Second, installed prices reported for utility-scale projects often reflect transactions that occurred several years before project completion; the prices reported for some of these projects may not fully capture recent reductions in module costs or other changes in market conditions, and thus may exhibit a relatively large 搕emporal lag.

Barbose, Galen; Weaver, Samantha; Darghouth, Naim

2014-08-26T23:59:59.000Z

236

THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION  

E-Print Network (OSTI)

THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION JACK E. BAILEY' AND DALE R. EVANS' ABSTRACT A proposed hydroelectric installation in southeastern hydroelectric installation could result in temperatures as low as 4.5 0 C during spawning and initial incubation

237

Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1  

E-Print Network (OSTI)

Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1 Rob Gross 2 trenching operations for pipeline installation. Although mechanical soil excavation using heavy equipment are routinely installed, repaired, and replaced underground. During soil excavation, tree and other plant roots

Standiford, Richard B.

238

PIBASE.ligands installation guide. ver 200905 Fred P. Davis, HHMI-JFRC  

E-Print Network (OSTI)

SQL interface, a software package is also available that enables a web interface to the database. The database Web interface To install the web interface to the PIBASE.ligands database, you must first have a working PIBASE web server installed. Once you have the PIBASE web interface installed, download the PIBASE

Eddy, Sean

239

AN EXAMINATION OF BICYCLE COUNTS AND SPEEDS ASSOCIATED WITH THE INSTALLATION OF BIKE LANES  

E-Print Network (OSTI)

AN EXAMINATION OF BICYCLE COUNTS AND SPEEDS ASSOCIATED WITH THE INSTALLATION OF BIKE LANES IN ST An Examination of Bicycle Counts and Speeds Associated with the Installation of Bike Lanes in St. Petersburg It is assumed that installation of bicycle facilities will result in an increase in the number of bicyclists

North Carolina at Chapel Hill, University of

240

4 ESS switch electromagnetic pulse assessment. Volume 1. Test-bed design installation, and baselining. Final report  

SciTech Connect

The content of this report is defined by paragraph 3/1 of the Statement of Work for contract DCA100-88-C-0027. This report documents Task 1 and 2, Test-Bed Design, Installation, and Baselining of the 4 ESS Switch Electromagnetic Pulse (EMP) Assessment Program. ATT has engineered an operational digital 4 ESS switch for the purpose of testing the susceptibility of 4 ESS switch systems to high-altitude EMP. The switch is installed in two specially designed trailers that are transparent to electro-magnetic radiation and is located in Colorado Springs, Colorado, where current-injection testing and further performance baselining is presently underway. Batteries, air conditioning, and spare parts are housed in two additional trailers. ATT Bell Laboratories has developed and implemented a test system for generating current pulses, monitoring the pulses, generating calls, and measuring switch performance. Digital traffic has been successfully generated and switched for three signaling systems: Multifrequency (MF); Common Channel Signaling System 7 (CCS7); and Q.931 (used on direct Integrated Services Digital Network connections). Due to problems in acquiring properly engineered signaling-translation software, however, the CCS7 and Q.931 signaling systems have not yet been implemented with a full complement of trunk assignments. Subsequent tasks will entail further baselining, provisioning of backup methods for the operating software, and current-injection testing of the switch.

Not Available

1989-06-19T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Thermoelectric Generators 1. Thermoelectric generator  

E-Print Network (OSTI)

. Cold Hot I - -- - - - - -- Figure 1 Electron concentration in a thermoelectric material. #12;2 A large1 Thermoelectric Generators HoSung Lee 1. Thermoelectric generator 1.1 Basic Equations In 1821 on the direction of current and material [3]. This is called the Thomson effect (or Thomson heat). These three

Lee, Ho Sung

242

Small Generator Aggregation (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generator Aggregation (Maine) Generator Aggregation (Maine) Small Generator Aggregation (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maine Program Type Green Power Purchasing Provider Public Utilities Commission This section establishes requirements for electricity providers to purchase

243

Abatement of Air Pollution: Distributed Generators (Connecticut) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Distributed Generators (Connecticut) Distributed Generators (Connecticut) Abatement of Air Pollution: Distributed Generators (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Connecticut Program Type Environmental Regulations Provider Department of Energy and Environmental Protection

244

Solar space heating installed at Kansas City, Kansas. Final report  

SciTech Connect

The solar energy system was constructed with the new 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while the auxiliary energy system heats the office area of about 9800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors, manufactured by Solaron Corporation, are double glazed flat plate collectors with a gross area of 7800 ft/sup 2/. Air is heated either through the collectors or by the electric resistance duct coils. No freeze protection or storage is required for this system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

Not Available

1981-05-01T23:59:59.000Z

245

Installation for a nuclear power station with staggered swimming pools  

SciTech Connect

In an installation for a nuclear power station comprising a ''reactor building'' with a first swimming pool for handling of fuel units and a fuel building with a second swimming pool for the transfer, storage and deactivation of the units, the second swimming pool is located at a lower level than that of the first and is connected to the first by an intermediate auxiliary chamber filled with water and located under the first swimming pool. The auxiliary chamber is connected by a vertical pipeline to the first swimming pool and by a horizontal connecting pipeline to the second swimming pool. Each of the pipelines is provided with a shut-off valve, with interlocking means which prevents the simultaneous opening of the two valves. There is negligible dead space around a conveyor basket for fuel units when it is in the vertical or horizontal pipelines.

Gigou, R.

1982-12-28T23:59:59.000Z

246

Retrofit SCADA installation combines SCADA and process control functions  

SciTech Connect

When Gulf States Utilities Company`s (now part of Entergy Operations, Inc.) River Bend Nuclear Plant, decided to add a closed cooling water system for the plant service water, a new SCADA system was required. Previously the normal service water system shared common cooling towers and flume with the plant`s circulating water system. Closing the system required a new cooling tower with pumps and heat exchangers to be constructed in a remote location. Existing equipment in the area was controlled via a multichannel tone SCADA system that did not have sufficient spare capacity for control of the new components. This paper will discuss how a new SCADA system was designed and installed, that also included process control. It will also address the operational experience to date.

Moffitt, T.O. [Entergy Operations, Inc., St. Francisville, LA (United States)

1995-09-01T23:59:59.000Z

247

Information handbook on independent spent fuel storage installations  

SciTech Connect

In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

Raddatz, M.G.; Waters, M.D.

1996-12-01T23:59:59.000Z

248

California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors  

E-Print Network (OSTI)

1 California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors in the CSI-Thermal to the mixing valve. Place the hot sensor on the pipe between the solar tank and the backup water heater. #12

249

Safety of Hydrogen Systems Installed in Outdoor Enclosures  

SciTech Connect

The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energy抯 (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panel抯 initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panel抯 recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panel抯 work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called 揷abinets, but for simplicity, they are all referred to as 揺nclosures in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical basis be developed to enable code bodies to write requirements for the range of enclosures from the smallest to the largest.

Barilo, Nick F.

2013-11-06T23:59:59.000Z

250

Installation of PV systems in Greece桼eliability improvement in the transmission and distribution system  

Science Journals Connector (OSTI)

Photovoltaic (PV) power systems are becoming one of the most developing investment areas in the field of Renewable Energy Sources (RES). A statement of the status quo of PV power systems in Greece, and their contribution towards the improvement of power system reliability, is the scope of the present paper. Siting and installation of PV power systems is performed according to a recent Greek law, along with environmental and geographical constraints. Meteorological data are computed, formulated and imported to appropriate software in order to simulate the PV units and generate their power output. Data for unserved loads, resulting from load shedding during peak hours, are compared to the above estimated power production. Assuming that a proportion of the eventually unsupplied power could be provided by the accessed power generation of the PV units, the reliability of both transmission and distribution system is improved. The impact on the transmission system is shown by an improvement of LOLP and LOEP indices, whereas peak shaving for the Interconnected Greek Transmission System (IGTS) is also illustrated. For the distribution system the impact is quantified using the distribution system reliability indices SAIDI, SAIFI, and CAIDI. Finally, the resulting improvement is also expressed in financial terms.

Aggelos S. Bouhouras; Antonios G. Marinopoulos; Dimitris P. Labridis; Petros S. Dokopoulos

2010-01-01T23:59:59.000Z

251

Quasiseparable Generators  

Science Journals Connector (OSTI)

It is clear from the preceding chapter that any matrix has quasiseparable representations. By padding given quasiseparable generators with zero matrices of large sizes one ... large orders. However, one is lookin...

Yuli Eidelman; Israel Gohberg

2014-01-01T23:59:59.000Z

252

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

253

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance

254

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Defense Partner to Install Fuel Cell Backup Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

255

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

256

New Generation Cooperative Incentive Tax Credit Program (Missouri) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Generation Cooperative Incentive Tax Credit Program (Missouri) New Generation Cooperative Incentive Tax Credit Program (Missouri) New Generation Cooperative Incentive Tax Credit Program (Missouri) < Back Eligibility Agricultural Commercial Construction Developer Industrial Installer/Contractor Multi-Family Residential Transportation Utility Program Info State Missouri Program Type Personal Tax Incentives Provider Missouri Department of Agriculture The Missouri Agricultural and Small Business Development Authority provides New Generation Cooperative Incentive Tax Credits to induce producer member investment into new generation processing entities that will process Missouri agricultural commodities and agricultural products into value-added goods, provide substantial benefits to Missouri's agricultural producers, and create jobs for Missourians. New generation

257

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

Barbose, Galen

2011-01-01T23:59:59.000Z

258

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network (OSTI)

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Wiser, Ryan

2009-01-01T23:59:59.000Z

259

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Barbose, Galen

2011-01-01T23:59:59.000Z

260

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network (OSTI)

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Barbose, Galen L

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Holy Cross Energy - WE CARE Renewable Energy Generation Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Holy Cross Energy - WE CARE Renewable Energy Generation Rebate Holy Cross Energy - WE CARE Renewable Energy Generation Rebate Program Holy Cross Energy - WE CARE Renewable Energy Generation Rebate Program < Back Eligibility Commercial Institutional Residential Savings Category Bioenergy Buying & Making Electricity Water Solar Heating & Cooling Water Heating Wind Maximum Rebate $9,000/installation, up to 50% of installed cost. Systems larger than 6 kW may receive a higher rebate. Solar Water Heating: $6,000, up to 50% of installed cost. Program Info State Colorado Program Type Utility Rebate Program Rebate Amount $1.50/watt DC ($1.00/W "hardware incentive", and $0.50/W "REC incentive") Systems larger than 6 kW may receive a different rebate amount. Solar Water Heating: $1,500 per panel Provider Holy Cross Energy

262

Rocky Flats CAAS System Recalibrated, Retested, and Analyzed to Install in the Criticality Experiments Facility at the Nevada Test Site  

E-Print Network (OSTI)

transferred from LLNL to NSTec for installation at the CEFSecurity Technologies (NSTec) is a great example of thetransferred from LLNL to NSTec for installation at the CEF

2009-01-01T23:59:59.000Z

263

Environmental Impacts From the Installation and Operation of Large-scale Solar Power Plants  

SciTech Connect

Large-scale solar power plants are being developed at a rapid rate, and are setting up to use thousands or millions of acres of land globally. The environmental issues related to the installation and operation phases of such facilities have not, so far, been addressed comprehensively in the literature. Here we identify and appraise 32 impacts from these phases, under the themes of land use intensity, human health and well-being, plant and animal life, geohydrological resources, and climate change. Our appraisals assume that electricity generated by new solar power facilities will displace electricity from traditional U.S. generation technologies. Altogether we find 22 of the considered 32 impacts to be beneficial. Of the remaining 10 impacts, 4 are neutral, and 6 require further research before they can be appraised. None of the impacts are negative relative to traditional power generation. We rank the impacts in terms of priority, and find all the high-priority impacts to be beneficial. In quantitative terms, large-scale solar power plants occupy the same or less land per kW h than coal power plant life cycles. Removal of forests to make space for solar power causes CO{sub 2} emissions as high as 36 g CO{sub 2} kW h{sup -1}, which is a significant contribution to the life cycle CO{sub 2} emissions of solar power, but is still low compared to CO{sub 2} emissions from coal-based electricity that are about 1100 g CO{sub 2} kW h{sup -1}.

Fthenakis, V.; Turney, Damon

2011-04-23T23:59:59.000Z

264

Microwave generator  

DOE Patents (OSTI)

A microwave generator is provided for generating microwaves substantially from virtual cathode oscillation. Electrons are emitted from a cathode and accelerated to an anode which is spaced apart from the cathode. The anode has an annular slit there through effective to form the virtual cathode. The anode is at least one range thickness relative to electrons reflecting from the virtual cathode. A magnet is provided to produce an optimum magnetic field having the field strength effective to form an annular beam from the emitted electrons in substantial alignment with the annular anode slit. The magnetic field, however, does permit the reflected electrons to axially diverge from the annular beam. The reflected electrons are absorbed by the anode in returning to the real cathode, such that substantially no reflexing electrons occur. The resulting microwaves are produced with a single dominant mode and are substantially monochromatic relative to conventional virtual cathode microwave generators. 6 figs.

Kwan, T.J.T.; Snell, C.M.

1987-03-31T23:59:59.000Z

265

Solar Energy Generation in Three Dimensions  

E-Print Network (OSTI)

Optimizing the conversion of solar energy to electricity is central to the World's future energy economy. Flat photovoltaic panels are commonly deployed in residential and commercial rooftop installations without sun tracking systems and using simple installation guidelines to optimize solar energy collection. Large-scale solar energy generation plants use bulky and expensive sun trackers to avoid cosine losses from photovoltaic panels or to concentrate sunlight with mirrors onto heating fluids.[1,2] However, none of these systems take advantage of the three-dimensional nature of our biosphere, so that solar energy collection largely occurs on flat structures in contrast with what is commonly observed in Nature.[3,4] Here we formulate, solve computationally and study experimentally the problem of collecting solar energy in three-dimensions.[5] We demonstrate that absorbers and reflectors can be combined in the absence of sun tracking to build three-dimensional photovoltaic (3DPV) structures that can generate ...

Bernardi, Marco; Wan, Jin H; Villalon, Rachelle; Grossman, Jeffrey C

2011-01-01T23:59:59.000Z

266

Photovoltaics Design and Installation Manual | Open Energy Information  

Open Energy Info (EERE)

Photovoltaics Design and Installation Manual Photovoltaics Design and Installation Manual Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Photovoltaics Design and Installation Manual Agency/Company /Organization: Solar Energy International Sector: Energy Focus Area: Renewable Energy, Solar, - Solar PV Resource Type: Training materials User Interface: Other Website: www.solarenergy.org/bookstore/photovoltaics-design-installation-manual Cost: Paid Language: "English, Spanish; Castilian" is not in the list of possible values (Abkhazian, Achinese, Acoli, Adangme, Adyghe; Adygei, Afar, Afrihili, Afrikaans, Afro-Asiatic languages, Ainu, Akan, Akkadian, Albanian, Aleut, Algonquian languages, Altaic languages, Amharic, Angika, Apache languages, Arabic, Aragonese, Arapaho, Arawak, Armenian, Aromanian; Arumanian; Macedo-Romanian, Artificial languages, Assamese, Asturian; Bable; Leonese; Asturleonese, Athapascan languages, Australian languages, Austronesian languages, Avaric, Avestan, Awadhi, Aymara, Azerbaijani, Balinese, Baltic languages, Baluchi, Bambara, Bamileke languages, Banda languages, Bantu (Other), Basa, Bashkir, Basque, Batak languages, Beja; Bedawiyet, Belarusian, Bemba, Bengali, Berber languages, Bhojpuri, Bihari languages, Bikol, Bini; Edo, Bislama, Blin; Bilin, Blissymbols; Blissymbolics; Bliss, Bosnian, Braj, Breton, Buginese, Bulgarian, Buriat, Burmese, Caddo, Catalan; Valencian, Caucasian languages, Cebuano, Celtic languages, Central American Indian languages, Central Khmer, Chagatai, Chamic languages, Chamorro, Chechen, Cherokee, Cheyenne, Chibcha, Chichewa; Chewa; Nyanja, Chinese, Chinook jargon, Chipewyan; Dene Suline, Choctaw, Chuukese, Chuvash, Classical Newari; Old Newari; Classical Nepal Bhasa, Classical Syriac, Coptic, Cornish, Corsican, Cree, Creek, Creoles and pidgins , Crimean Tatar; Crimean Turkish, Croatian, Cushitic languages, Czech, Dakota, Danish, Dargwa, Delaware, Dinka, Divehi; Dhivehi; Maldivian, Dogri, Dogrib, Dravidian languages, Duala, Dutch; Flemish, Dyula, Dzongkha, Eastern Frisian, Efik, Egyptian (Ancient), Ekajuk, Elamite, English, Erzya, Esperanto, Estonian, Ewe, Ewondo, Fang, Fanti, Faroese, Fijian, Filipino; Pilipino, Finnish, Finno-Ugrian languages, Fon, French, Friulian, Fulah, Ga, Gaelic; Scottish Gaelic, Galibi Carib, Galician, Ganda, Gayo, Gbaya, Geez, Georgian, German, Germanic languages, Gilbertese, Gondi, Gorontalo, Gothic, Grebo, Greek, Modern, Guarani, Gujarati, Gwich'in, Haida, Haitian; Haitian Creole, Hausa, Hawaiian, Hebrew, Herero, Hiligaynon, Himachali languages; Western Pahari languages, Hindi, Hiri Motu, Hittite, Hmong; Mong, Hungarian, Hupa, Iban, Icelandic, Ido, Igbo, Ijo languages, Iloko, Inari Sami, Indic languages, Indo-European languages, Indonesian, Ingush, Interlingue; Occidental, Inuktitut, Inupiaq, Iranian languages, Irish, Iroquoian languages, Italian, Japanese, Javanese, Judeo-Arabic, Judeo-Persian, Kabardian, Kabyle, Kachin; Jingpho, Kalaallisut; Greenlandic, Kalmyk; Oirat, Kamba, Kannada, Kanuri, Kara-Kalpak, Karachay-Balkar, Karelian, Karen languages, Kashmiri, Kashubian, Kawi, Kazakh, Khasi, Khoisan languages, Khotanese; Sakan, Kikuyu; Gikuyu, Kimbundu, Kinyarwanda, Kirghiz; Kyrgyz, Klingon; tlhIngan-Hol, Komi, Kongo, Konkani, Korean, Kosraean, Kpelle, Kru languages, Kuanyama; Kwanyama, Kumyk, Kurdish, Kurukh, Kutenai, Ladino, Lahnda, Lamba, Land Dayak languages, Lao, Latin, Latvian, Lezghian, Limburgan; Limburger; Limburgish, Lingala, Lithuanian, Lojban, Lower Sorbian, Lozi, Luba-Katanga, Luba-Lulua, Luiseno, Lule Sami, Lunda, Luo (Kenya and Tanzania), Lushai, Luxembourgish; Letzeburgesch, Macedonian, Madurese, Magahi, Maithili, Makasar, Malagasy, Malay, Malayalam, Maltese, Manchu, Mandar, Mandingo, Manipuri, Manobo languages, Manx, Maori, Mapudungun; Mapuche, Marathi, Mari, Marshallese, Marwari, Masai, Mayan languages, Mende, Mi'kmaq; Micmac, Minangkabau, Mirandese, Mohawk, Moksha, Mon-Khmer languages, Mongo, Mongolian, Mossi, Multiple languages, Munda languages, N'Ko, Nahuatl languages, Nauru, Navajo; Navaho, Ndebele, North; North Ndebele, Ndebele, South; South Ndebele, Ndonga, Neapolitan, Nepal Bhasa; Newari, Nepali, Nias, Niger-Kordofanian languages, Nilo-Saharan languages, Niuean, North American Indian languages, Northern Frisian, Northern Sami, Norwegian, Nubian languages, Nyamwezi, Nyankole, Nyoro, Nzima, Occitan (post 1500); Proven鈭毭焌l, Ojibwa, Oriya, Oromo, Osage, Ossetian; Ossetic, Otomian languages, Pahlavi, Palauan, Pali, Pampanga; Kapampangan, Pangasinan, Panjabi; Punjabi, Papiamento, Papuan languages, Pedi; Sepedi; Northern Sotho, Persian, Philippine languages, Phoenician, Pohnpeian, Polish, Portuguese, Prakrit languages, Pushto; Pashto, Quechua, Rajasthani, Rapanui, Rarotongan; Cook Islands Maori, Romance languages, Romanian; Moldavian; Moldovan, Romansh, Romany, Rundi, Russian, Salishan languages, Samaritan Aramaic, Sami languages, Samoan, Sandawe, Sango, Sanskrit, Santali, Sardinian, Sasak, Scots, Selkup, Semitic languages, Serbian, Serer, Shan, Shona, Sichuan Yi; Nuosu, Sicilian, Sidamo, Sign Languages, Siksika, Sindhi, Sinhala; Sinhalese, Sino-Tibetan languages, Siouan languages, Skolt Sami, Slave (Athapascan), Slavic languages, Slovak, Slovenian, Sogdian, Somali, Songhai languages, Soninke, Sorbian languages, Sotho, Southern, South American Indian (Other), Southern Altai, Southern Sami, Spanish; Castilian, Sranan Tongo, Sukuma, Sumerian, Sundanese, Susu, Swahili, Swati, Swedish, Swiss German; Alemannic; Alsatian, Syriac, Tagalog, Tahitian, Tai languages, Tajik, Tamashek, Tamil, Tatar, Telugu, Tereno, Tetum, Thai, Tibetan, Tigre, Tigrinya, Timne, Tiv, Tlingit, Tok Pisin, Tokelau, Tonga (Nyasa), Tonga (Tonga Islands), Tsimshian, Tsonga, Tswana, Tumbuka, Tupi languages, Turkish, Turkmen, Tuvalu, Tuvinian, Twi, Udmurt, Ugaritic, Uighur; Uyghur, Ukrainian, Umbundu, Uncoded languages, Undetermined, Upper Sorbian, Urdu, Uzbek, Vai, Venda, Vietnamese, Volap鈭毬簁, Votic, Wakashan languages, Walamo, Walloon, Waray, Washo, Welsh, Western Frisian, Wolof, Xhosa, Yakut, Yao, Yapese, Yiddish, Yoruba, Yupik languages, Zande languages, Zapotec, Zaza; Dimili; Dimli; Kirdki; Kirmanjki; Zazaki, Zenaga, Zhuang; Chuang, Zulu, Zuni) for this property.

267

Tracking benefits for solar collectors installed in Bangalore  

Science Journals Connector (OSTI)

The amount of energy that can be extracted from the solar radiation by solar collectors or photovoltaic systems depends mainly on the installation angle of the collector (tilt angle) and the tracking method used to follow the Sun. In this paper the optimum tilt angle for Bangalore ( 12 5 8 ? ) has been calculated under various tracking conditions. For a fixed tilt angle collector facing south the optimum tilt angle is estimated to be between 15 and 17 and is not very sensitive to radiation data type. Fixed tilt angle collectors and collectors tilted on a monthly basis produced only marginal benefit ( horizontal orientation. However for continuously tracked systems benefits are as high as 35%. At least three sets of solar radiation data are available for Bangalore from different sources. It has been shown that they have considerable differences in their direct and diffuse content. All these data have been used to quantify tracking benefits to understand their sensitivity. Limited amount of available in-house data indicates higher diffuse fraction in solar radiation than predicted by historic data and satellite models. Hence the benefits due to tilting are reduced.

Pascal Fahl; Ganapathisubbu S

2011-01-01T23:59:59.000Z

268

Modular Integrated Monitoring System (MIMS) field test installations  

SciTech Connect

The MIMS program is funded by the Department of Energy under the Office of Nonproliferation and National Security. The program objective is to develop cost effective, modular, multi-sensor monitoring systems. Both in-plant and ground based sensors are envisioned. It is also desirable to develop sensors/systems that can be fielded/deployed in a rapid fashion. A MIMS architecture was selected to allow modular integration of sensors and systems and is based on LonWorks technology, commercially developed by Echelon Corporation. The first MIMS fieldable hardware was demonstrated at Lawrence Livermore National Laboratory. The field test, known within the DOE as the Item Tracking and Transparency (IT&I) demonstration, involved the collaboration and cooperation of five DOE laboratories (Sandia (SNL), Lawrence Livermore (LLNL), Pacific Northwest (PNL), Los Alamos (LANL), and Oak Ridge (ORNL)). The IT&T demonstration involved the monitoring of special nuclear material as it was transported around the facility utilizing sensors from the participating labs. The scenario was programmed to ignore normal activity in the facility until entry into the room where the material was stored. A second demonstration, which involved three separate scenarios, was conducted at Idaho National Engineering Laboratory (INEL). The participants included representatives from SNL, LLNL, PNL, and INEL. DOE has selected INEL as the long term testbed for MIMS developed sensors, systems, and scenarios. This paper will describe the installation, intended purpose, and results of the field demonstrations at LLNL and INEL under the MIMS program.

Martinez, R.L.; Waymire, D.R. [Sandia National Labs., Albuquerque, NM (United States); Fuess, D.A. [Lawrence Livermore National Lab., CA (United States)] [and others

1995-07-01T23:59:59.000Z

269

Installation of the MAXIMUM microscope at the ALS  

SciTech Connect

The MAXIMUM scanning x-ray microscope, developed at the Synchrotron Radiation Center (SRC) at the University of Wisconsin, Madison was implemented on the Advanced Light Source in August of 1995. The microscope`s initial operation at SRC successfully demonstrated the use of multilayer coated Schwarzschild objective for focusing 130 eV x-rays to a spot size of better than 0.1 micron with an electron energy resolution of 250meV. The performance of the microscope was severely limited, because of the relatively low brightness of SRC, which limits the available flux at the focus of the microscope. The high brightness of the ALS is expected to increase the usable flux at the sample by a factor of 1,000. The authors will report on the installation of the microscope on bending magnet beamline 6.3.2 at the ALS and the initial measurement of optical performance on the new source, and preliminary experiments with surface chemistry of HF etched Si will be described.

Ng, W.; Perera, R.C.C.; Underwood, J.H. [Lawrence Berkeley Lab., CA (United States); Singh, S.; Solak, H.; Cerrina, F. [Univ. of Wisconsin, Stoughton, WI (United States). Center for X-ray Lithography

1995-10-01T23:59:59.000Z

270

Solar installer training: Home Builders Institute Job Corps  

SciTech Connect

The instructors describe the solar installation training program operated since 1979 by the Home Builders Institute, the Educational Arm of the National Association of Home Builders for the US Department of Labor, Job Corps in San Diego, CA. The authors are the original instructors and have developed the program since its inception by a co-operative effort between the Solar Energy Industries Association, NAHB and US DOL. Case studies of a few of the 605 students who have gone to work over the years after the training are included. It is one of the most successful programs under the elaborate Student Performance Monitoring Information System used by all Job Corps programs. Job Corps is a federally funded residential job training program for low income persons 16--24 years of age. Discussion details the curriculum and methods used in the program including classroom, shop and community service projects. Solar technologies including all types of hot water heating, swimming pool and spa as well as photovoltaics are included.

Hansen, K.; Mann, R. [San Diego Job Corps Center, Imperial Beach, CA (United States). Home Builders Inst.

1996-10-01T23:59:59.000Z

271

Status and plans for Linac4 installation and commissioning  

E-Print Network (OSTI)

Linac4 is a normal conducting 160 MeV H? linear accelerator presently being installed and progressively commissioned at CERN. It will replace the ageing 50 MeV Linac2 as injector of the PS Booster (PSB), increasing at the same time its brightness by a factor of two thanks to the higher injection energy. This will be the first step of a program to increase the beam brightness in the LHC injectors for the needs of the High-Luminosity LHC project. After a series of beam measurements on a dedicated test stand the 3 MeV Linac4 front-end, including ion source, RFQ and a beam chopping line, has been recommissioned at its final position in the Linac4 tunnel. Commissioning of the following section, the Drift Tube Linac, is starting. Beam commissioning will take place in steps of increasing energy, to reach the final 160 MeV in 2015. An extended beam measurement phase including testing of stripping equipment for the PSB and a year-long test run to assess and improve Linac4 reliability will take place in 2016, prior to...

Vretenar, M; Arnaudon, L; Baudrenghien, P; Bellodi, G; Broere, J; Brunner, O; Comblin, J F; Coupard, J; Dimov, V A; Fuchs, J F; Funken, A; Gerigk, F; Granemann Souza, E; Hanke, K; Hansen, J; Yarmohammadi Satri, M; Kozsar, I; Lallement, J B; Lenardon, F; Lettry, J; Lombardi, A M; Maglioni, C; Midtun, O; Mikulec, B; Nisbet, D; Paoluzzi, M; Raich, U; Ramberger, S; Roncarolo, F; Rossi, C; Sanchez Alvarez, J L; Scrivens, R; Tan, J; Valerio-Lizarraga, C A; Vollaire, J; Wegner, R; Weisz, S; Zocca, F

2014-01-01T23:59:59.000Z

272

Coal-fired diesel generator  

SciTech Connect

The objective of the proposed project is to test the technical, environmental, and economic viability of a coal-fired diesel generator for producing electric power in small power generating markets. Coal for the diesel generator would be provided from existing supplies transported for use in the University`s power plant. A cleanup system would be installed for limiting gaseous and particulate emissions. Electricity and steam produced by the diesel generator would be used to supply the needs of the University. The proposed diesel generator and supporting facilities would occupy approximately 2 acres of land adjacent to existing coal- and oil-fired power plant and research laboratory buildings at the University of Alaska, Fairbanks. The environmental analysis identified that the most notable changes to result from the proposed project would occur in the following areas: power plant configuration at the University of Alaska, Fairbanks; air emissions, water use and discharge, and the quantity of solid waste for disposal; noise levels at the power plant site; and transportation of coal to the power plant. No substantive adverse impacts or environmental concerns were identified in analyzing the effects of these changes.

NONE

1997-05-01T23:59:59.000Z

273

Obama Administration Announces Plans to Install New Solar Panels on the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Plans to Install New Solar Panels on Announces Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 - 12:00am Addthis WASHINGTON - U.S. Energy Secretary Steven Chu and Council of Environmental Quality (CEQ) Chair Nancy Sutley today announced plans to install solar panels and a solar hot water heater on the roof of the White House Residence. These two solar installations will be part of a Department of Energy demonstration project showing that American solar technologies are available, reliable, and ready for installation in homes throughout the country. Secretary Chu and Chair Sutley made the announcement during CEQ's 2010 GreenGov Symposium, which is bringing together leaders from Federal,

274

This Flash transmits the second installment under this project. Additional insta  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This Flash transmits the second installment under this project. Additional installments This Flash transmits the second installment under this project. Additional installments will follow as they are completed. There are two significant chapter revisions in this installment: 6.1, Competition; and 35.1, Scientific and Technical Information. There are also five primarily editorial chapter revisions in this installment, though the revisions include some updated materials as well: 17.2, Cost Participation; 17.4 Program Opportunity Notices; 17.5 Program Research and Development Notices; 22.1, Labor Standards for Construction; and 47.1, Transportation - Air Charter. Finally, three chapters have been removed. Chapter 45, Government Property, was removed because the coverage was obsolete. Chapter 70.1, Cost Participation, was removed because it was duplicative of 17.2 and inappropriate in

275

Reduce generating costs and eliminate brownouts  

SciTech Connect

Improving the manoeuverability of a coal-fired plant to allow it to participate in primary frequency support will reduce generation cost and minimize brownouts. The challenge is to do so without compromising efficiency or emissions. This article describes an approach - activation of stored energy - that is cost-effective and applicable to both greenfield and brownfield installations. It requires a new control philosophy, plus the correct application of new level and flow measurement 'best practices'. 4 refs., 1 tab.

Nogaja, R.; Menezes, M. [Emerson Process Management (United States)

2007-06-15T23:59:59.000Z

276

Application of novel adaptive control of STATCOM in wind power generation  

Science Journals Connector (OSTI)

During the last years the amount of installed wind power has continued increased. The impact of wind generation on the electrical system should be assessed to figure out potential hazards to system operation and decreasing of quality, stability and reliability ... Keywords: FACT device, STATCOM, SVC, adaptive control, induction generator, wind generation

Nikolay Djagarov; Zhivko Grozdev; Milen Bonev; Stefan Filchev

2010-07-01T23:59:59.000Z

277

EEMD-based wind turbine bearing failure detection using the generator stator current homopolar component  

E-Print Network (OSTI)

EEMD-based wind turbine bearing failure detection using the generator stator current homopolar turbine generators for stationary and non stationary cases. Keyword: Wind turbine, induction generator on the installed equipment because they are hardly accessible or even inaccessible [1]. 1.1. Wind turbine failure

Boyer, Edmond

278

Uncertainty Analysis of the Adequacy Assessment Model of a Distributed Generation System  

E-Print Network (OSTI)

of evidence theory, the hybrid propagation approach is introduced. A demonstration is given on a DG system enables end-users to install renewable generators (e.g. solar generators and wind turbines) on1 Uncertainty Analysis of the Adequacy Assessment Model of a Distributed Generation System Yanfu Li

Paris-Sud XI, Universit茅 de

279

Building America Expert Meeting: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces  

Energy.gov (U.S. Department of Energy (DOE))

This report describes a Building America expert meeting hosted on July 28, 2011, by the Partnership for Advanced Residential Retrofit team. The purpose of this meeting was to identify installation practices that provide the best installed efficiency for residential gas furnaces, explain how AFUE and field efficiency can differ, and investigate the impact of installation practices on the efficiency and long-term durability of the furnace.

280

Determining the return of energy efficiency investments in domestic and deployed military installations .  

E-Print Network (OSTI)

??The purpose of this research is to determine the return on energy efficiency investments in domestic installations and military forward operating bases. This research considers (more)

Gammache, Nathan J.

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

E-Print Network 3.0 - alcohol tank installed Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

AND ENVIRONMENTAL SCIENCES Summary: inspection. Risers should be installed on all new tanks and can even be retrofitted for existing tanks. All... that the septic tank needs...

282

Toroid field coil shear key installation study, DOE task No. 22  

SciTech Connect

Concepts for fitting and installation of the scissor keys, triangular keys, and truss keys in the ITER Toroidal Field (TF) Coil Assembly were developed and evaluated. In addition, the process of remote removal and replacement of a failed TF coil was considered. Two concepts were addressed: central solenoid installed last (Naka Option 1) and central solenoid installed first (Naka Option 2). In addition, a third concept was developed which utilized the favorable features of both concepts. A time line for installation was estimated for the Naka Option 1 concept.

Jones, C.E.; Meier, R.W.; Yuen, J.L.

1995-01-09T23:59:59.000Z

283

E-Print Network 3.0 - avoid radar installations Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

to 9o differences in flow directions. 1. INTRODUCTION We installed the first HF radar at Coal Oil... Evaluating radial component current measurements from CODAR high frequency...

284

Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation  

Science Journals Connector (OSTI)

The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices...

K. B. Gusakovskii; E. Yu. Zmaznov; S. V. Katantsev

2006-01-01T23:59:59.000Z

285

H.A.R. 19-105 - Accommodation and Installation of Utilities on...  

Open Energy Info (EERE)

Accommodation and Installation of Utilities on State Highways and Federal Aid County Highways Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

286

Registration of Electric Generators (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Registration of Electric Generators (Connecticut) Registration of Electric Generators (Connecticut) Registration of Electric Generators (Connecticut) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State Connecticut Program Type Generation Disclosure Provider Department of Energy and Environmental Protection All electric generating facilities operating in the state, with the

287

Nuclear Power Generating Facilities (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power Generating Facilities (Maine) Nuclear Power Generating Facilities (Maine) Nuclear Power Generating Facilities (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Radiation Control Program The first subchapter of the statute concerning Nuclear Power Generating Facilities provides for direct citizen participation in the decision to construct any nuclear power generating facility in Maine. The Legislature

288

Design and Installation of a Disposal Cell Cover Field Test  

SciTech Connect

The U.S. Department of Energy抯 Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

Benson, C.H. [University of Wisconsin朚adison, Madison, Wisconsin; Waugh, W.J. [S.M. Stoller Corporation, Grand Junction, Colorado; Albright, W.H. [Desert Research Institute, Reno, Nevada; Smith, G.M. [Geo-Smith Engineering, Grand Junction, Colorado; Bush, R.P. [U.S. Department of Energy, Grand Junction, Colorado

2011-02-27T23:59:59.000Z

289

Magnetocumulative generator  

DOE Patents (OSTI)

An improved magnetocumulative generator is described that is useful for producing magnetic fields of very high energy content over large spatial volumes. The polar directed pleated magnetocumulative generator has a housing providing a housing chamber with an electrically conducting surface. The chamber forms a coaxial system having a small radius portion and a large radius portion. When a magnetic field is injected into the chamber, from an external source, most of the magnetic flux associated therewith positions itself in the small radius portion. The propagation of an explosive detonation through high-explosive layers disposed adjacent to the housing causes a phased closure of the chamber which sweeps most of the magnetic flux into the large radius portion of the coaxial system. The energy content of the magnetic field is greatly increased by flux stretching as well as by flux compression. The energy enhanced magnetic field is utilized within the housing chamber itself.

Pettibone, J.S.; Wheeler, P.C.

1981-06-08T23:59:59.000Z

290

Monthly Generation System Peak (pbl/generation)  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation > Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Monthly Generation System Peak (GSP) This site is no longer maintained. Page last...

291

Photon generator  

DOE Patents (OSTI)

A photon generator includes an electron gun for emitting an electron beam, a laser for emitting a laser beam, and an interaction ring wherein the laser beam repetitively collides with the electron beam for emitting a high energy photon beam therefrom in the exemplary form of x-rays. The interaction ring is a closed loop, sized and configured for circulating the electron beam with a period substantially equal to the period of the laser beam pulses for effecting repetitive collisions.

Srinivasan-Rao, Triveni (Shoreham, NY)

2002-01-01T23:59:59.000Z

292

Install Waste Heat Recovery Systems for Fuel-Fired Furnaces (English/Chinese) (Fact Sheet)  

SciTech Connect

Chinese translation of ITP fact sheet about installing Waste Heat Recovery Systems for Fuel-Fired Furnaces. For most fuel-fired heating equipment, a large amount of the heat supplied is wasted as exhaust or flue gases. In furnaces, air and fuel are mixed and burned to generate heat, some of which is transferred to the heating device and its load. When the heat transfer reaches its practical limit, the spent combustion gases are removed from the furnace via a flue or stack. At this point, these gases still hold considerable thermal energy. In many systems, this is the greatest single heat loss. The energy efficiency can often be increased by using waste heat gas recovery systems to capture and use some of the energy in the flue gas. For natural gas-based systems, the amount of heat contained in the flue gases as a percentage of the heat input in a heating system can be estimated by using Figure 1. Exhaust gas loss or waste heat depends on flue gas temperature and its mass flow, or in practical terms, excess air resulting from combustion air supply and air leakage into the furnace. The excess air can be estimated by measuring oxygen percentage in the flue gases.

Not Available

2011-10-01T23:59:59.000Z

293

Design, Installation and Performance of the New insulator for NSTX CHI Experiments  

SciTech Connect

Coaxial Helicity Injection (CHI), a non-inductive method to initiate plasma and generate toroidal plasma current, is being investigated in the National Spherical Torus Experiment (NSTX). The center stack and outer vacuum vessel are separated by insulating gaps at the top and bottom of the slim central column so that a high voltage (up to 2 kV) can be applied between them from a pulsed power supply or a capacitor bank to initiate an arc discharge. In the presence of a suitable poloidal magnetic field, the discharge is initiated at the lower gap (the injector gap) and because of the strong toroidal field develops a helical structure resulting in substantial toroidal plasma current being driven. In NSTX, up to 390 kA of toroidal current has been generated for an injected current of 25 kA. The early investigations of CHI however frequently developed arcs across the insulator at the top of the machine (the absorber gap), which terminated the desired discharge. This arcing greatly restricted the operational space available for CHI studies. During 2002, the absorber region was modified to suppress these arcs. The new design includes a new ceramic insulator on the high field side of the absorber region with a much longer tracking distance between conducting elements at the different potentials. Furthermore, two new coils were installed near the absorber to provide the ability to minimize the poloidal field connecting the center stack and outer vacuum vessel. During the subsequent experimental campaign, CHI operation was less prone to arcing in the absorber and those arcs that did occur did not terminate the main discharge.)

Mueller, D; Chrzanowski, J; Gates, D; Menard, J; Raman, R; Jarboe, T R; Nelson, B A; Maqueda, R J

2008-03-05T23:59:59.000Z

294

Generation Technologies  

E-Print Network (OSTI)

Many local governments are using green power in their facilities and providing assistance to local businesses and residents to do the same. Green power is a subset of renewable energy that is produced with no GHG emissions, typically from solar, wind, geothermal, biogas, biomass, or low-impact small hydroelectric sources, includes three types of products: utility products (i.e., green power purchased from the utility through the electricity grid), renewable energy certificates (RECs), and on-site generation. Opportunities to purchase these products are increasing significantly, with annual green power market growth rates

Green Power

2005-01-01T23:59:59.000Z

295

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Sun: The Installed Cost of Photovoltaics in the U.S. from Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Title Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, and Carla Peterman Pagination 42 Date Published 02/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76% of all grid-connected PV capacity installed in the U.S. through 2007.

296

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Title Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Barbose, Galen L., Na茂m Darghouth, and Ryan H. Wiser Pagination 54 Date Published 12/2010 Publisher LBNL City Berkeley Keywords distributed energy resources (der), electricity markets and policy group, energy analysis and environmental impacts department, energy markets, photovoltaics Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost1 of grid-connected PV systems in the United States from 1998 through 2009 (updating two previous reports with data through 2007 and 2008, respectively), and providing preliminary cost trends for systems installed in 2010. The analysis is based on installed cost data for approximately 78,000 residential and non-residential PV systems, totaling 874 megawatts (MW) and representing 70% of all grid-connected PV capacity installed in the United States through 2009.

297

Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations  

Energy.gov (U.S. Department of Energy (DOE))

Report highlights the increase in resources, project speed, and scale required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals. It also summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

298

Planning and Installation Guide: North Carolina Compressed Natural Gas Fueling Stations  

E-Print Network (OSTI)

1 Planning and Installation Guide: North Carolina Compressed Natural Gas Fueling Stations Introduction Are you considering installing a compressed natural gas (CNG) fueling station for your fleet of important items to consider when planning for a CNG station. Natural gas infrastructure, which is commonly

299

Magnetocumulative generator  

DOE Patents (OSTI)

An improved magnetocumulative generator is described that is useful for producing magnetic fields of very high energy content over large spatial volumes. The polar directed pleated magnetocumulative generator has a housing (100, 101, 102, 103, 104, 105) providing a housing chamber (106) with an electrically conducting surface. The chamber (106) forms a coaxial system having a small radius portion and a large radius portion. When a magnetic field is injected into the chamber (106), from an external source, most of the magnetic flux associated therewith positions itself in the small radius portion. The propagation of an explosive detonation through high-explosive layers (107, 108) disposed adjacent to the housing causes a phased closure of the chamber (106) which sweeps most of the magnetic flux into the large radius portion of the coaxial system. The energy content of the magnetic field is greatly increased by flux stretching as well as by flux compression. The energy enhanced magnetic field is utilized within the housing chamber itself.

Pettibone, Joseph S. (Livermore, CA); Wheeler, Paul C. (Livermore, CA)

1983-01-01T23:59:59.000Z

300

T-729: Mozilla Code Installation Through Holding Down Enter | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Mozilla Code Installation Through Holding Down Enter 9: Mozilla Code Installation Through Holding Down Enter T-729: Mozilla Code Installation Through Holding Down Enter September 29, 2011 - 8:30am Addthis PROBLEM: Mozilla Code Installation Through Holding Down Enter. PLATFORM: Versions prior to the following are vulnerable: Firefox 7.0 Firefox 3.6.23 Thunderbird 7.0 SeaMonkey 2.4 ABSTRACT: Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks. reference LINKS: Mozilla Foundation Security Advisory 2011-40 Firefox Security Advisories CVE-2011-2372 CVE-2011-3001 IMPACT ASSESSMENT: High Discussion: If a user holds down the Enter key--as part of a game or test, perhaps--a

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Renewable Electricity Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Electricity Generation Renewable Electricity Generation Renewable Electricity Generation Geothermal Read more Solar Read more Water Read more Wind Read more Our nation has abundant solar, water, wind, and geothermal energy resources, and many U.S. companies are developing, manufacturing, and installing cutting-edge, high-tech renewable energy systems. The Office of Energy Efficiency and Renewable Energy (EERE) leads a large network of researchers and other partners to deliver innovative technologies that will make renewable electricity generation cost competitive with traditional sources of energy. Working with our national laboratories and through these partnerships, we are catalyzing the transformation of the nation's energy system and building on a tradition of U.S. leadership in science and

302

Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System  

SciTech Connect

Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered 搈icro-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric efficiency, average net heat recovery efficiency, and overall net efficiency of the system increased respectively from 33% to 36%, from 38% to 41%, and from 71% to 76%. The temperature of water sent to sit however reduced by about 16% from 51?C to 43 ?C. This was a control strategy and the temperature can be controlled depending on building heat demands. More importantly, the number of shutdowns and maintenance events required to keep the systems running at the manufacturer抯 rated performance specifications were substantially reduced by about 76% (for 8 to 10 units running over a one-year period). From July 2012 to June 2013, there were eight CE5 units in operation and a total of 134 scheduled and unscheduled shutdowns took place. From July 2013 to June 2014, between two to ten units were in operation and only 32 shutdowns were reported (all unscheduled). In summary, the number of shutdowns reduced from 10 shutdowns per month on average for eight CE5units to an average of 2.7 shutdowns per month for M5 units (between two to ten units).

Brooks, Kriston P.; Makhmalbaf, Atefe

2014-10-31T23:59:59.000Z

303

Biogass Generator  

NLE Websites -- All DOE Office Websites (Extended Search)

Another internet tool by: Another internet tool by: Build Your Own Page 1 of 5 Teach...build...learn...renewable energy! Biogas Generator A Renewable Energy Project Kit The Pembina Institute What Is Biogas? Biogas is actually a mixture of gases, usually carbon dioxide and methane. It is produced by a few kinds of microorganisms, usually when air or oxygen is absent. (The absence of oxygen is called "anaerobic conditions.") Animals that eat a lot of plant material, particularly grazing animals such as cattle, produce large amounts of biogas. The biogas is produced not by the cow or elephant, but by billions of microor- ganisms living in its digestive system. Biogas also develops in bogs and at the bottom of lakes, where decaying organic matter builds up under wet and

304

Chapter 32 Standards Applicable to Generators of Hazardous Waste (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Standards Applicable to Generators of Hazardous Waste 2 Standards Applicable to Generators of Hazardous Waste (Kentucky) Chapter 32 Standards Applicable to Generators of Hazardous Waste (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Kentucky Program Type Environmental Regulations Provider Department for Environmental Protection This administrative regulation establishes procedures to establish the applicable general provisions for generators of hazardous waste. It also

305

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Title Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, Carla Peterman, and Na茂m Darghouth Pagination 150 Date Published 10/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2008 (updating a previous report with data through 2007). The analysis is based on installed cost data from more than 52,000 residential and non-residential PV systems, totaling 566 MW and representing 71% of all grid-connected PV capacity installed in the U.S. through 2008.

306

UTILIZATION OF SPENT RADIOISOTOPE THERMOELECTRIC GENERATORS AND INSTALLATION OF SOLAR CELL TECHNOLOGY AS POWER SOURCE FOR RUSSIAN LIGHTHOUSES - FINAL REPORT  

Science Journals Connector (OSTI)

The Northern Fleets hydrographical department has with support from Norway worked on the utilization of spent strontium-containing RTGs used as power sources at lighthouses situated at the Kola Peninsula.

PER-EINAR FISKEBECK

2006-01-01T23:59:59.000Z

307

Hybrid Solid Oxide Fuel Cell and Thermoelectric Generator for Maximum Power Output in Micro-CHP Systems  

Science Journals Connector (OSTI)

One of the most obvious early market applications for thermoelectric generators (TEG) is decentralized micro combined heat and power (CHP) installations of 0.5爇We to 5 ... possible to increase the electricity pr...

L. A. Rosendahl; Paw V. Mortensen; Ali A. Enkeshafi

2011-05-01T23:59:59.000Z

308

Thermoelectric generator  

SciTech Connect

A thermoelectric generator unit is described comprising: a hot side heat exchanger including a plate having extruded retention posts projecting from one surface of the plate, and fins adapted for contact with a heating source. The fins are positioned between two of the retention posts. Retention rods are inserted between the retention posts and the base of the fins to retain the fin in thermal contact with the plate surface upon insertion of the retention rod between the engaging surface of the post and the corresponding fin. Thermoelectric semi-conductor modules are in thermal contact with the opposite side of the hot side heat exchanger plate from the contact with the fins. The modules are arranged in a grid pattern so that heat flow is directed into each of the modules from the hot side heat exchanger. The modules are connected electrically so as to combine their electrical output; and a cold side heat exchanger is in thermal contact with the modules acting as a heat sink on the opposite side of the module from the hot side heat exchanger plate so as to produce a thermal gradient across the modules.

Shakun, W.; Bearden, J.H.; Henderson, D.R.

1988-03-29T23:59:59.000Z

309

Solar heating and cooling system installed at Columbus, Ohio. Final report  

SciTech Connect

The Solar Energy System installed at Columbus Technical Institute, Columbus, Ohio was installed as a part of a new construction of a college building. The building will house classrooms and laboratories, administrative offices and three lecture halls. The Solar Energy System consists of 4096 square feet (128 panels) Owens/Illinois Evacuated Glass Tube Collector Subsystem, and a 5000 gallon steel tank below ground storage system, hot water is circulated between the collectors and storage tank, passing through a water/lithium bromide absorption chiller to cool the building. Extracts from the site files specification references, drawings, installation, operation and maintenance instructions are included.

Coy, R. G.; Braden, R. P.

1980-09-01T23:59:59.000Z

310

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

311

Efficiently generate steam from cogeneration plants  

SciTech Connect

As cogeneration gets more popular, some plants have two choices of equipment for generating steam. Plant engineers need to have a decision chart to split the duty efficiently between (oil-fired or gas-fired) steam generators (SGs) and heat recovery steam generators (HRSGs) using the exhaust from gas turbines. Underlying the dilemma is that the load-versus-efficiency characteristics of both types of equipment are different. When the limitations of each type of equipment and its capability are considered, analysis can come up with several selection possibilities. It is almost always more efficient to generate steam in an HRSG (designed for firing) as compared with conventional steam generators. However, other aspects, such as maintenance, availability of personnel, equipment limitations and operating costs, should also be considered before making a final decision. Loading each type of equipment differently also affects the overall efficiency or the fuel consumption. This article describes the performance aspects of representative steam generators and gas turbine HRSGs and suggests how plant engineers can generate steam efficiently. It also illustrates how to construct a decision chart for a typical installation. The equipment was picked arbitrarily to show the method. The natural gas fired steam generator has a maximum capacity of 100,000 lb/h, 400-psig saturated steam, and the gas-turbine-exhaust HRSG has the same capacity. It is designed for supplementary firing with natural gas.

Ganapathy, V. [ABCO Industries, Abilene, TX (United States)

1997-05-01T23:59:59.000Z

312

Solar pumping installation for pumping liquid and solar collector construction  

SciTech Connect

A solar pumping system, comprises, a pumping housing which defines a pump chamber therein which is adapted to be positioned in the ground below ground water level. Displacer means in the form of, for example, a bladder, arranged within the pump chamber, is capable of displacing liquid out of the pump chamber in response to a pressurized medium acting thereon to expel the water out of the chamber and up to a level above the ground for use. A suction valve connected into the chamber permits the ground water to flow into the chamber and a discharge valve connected out of the chamber permits the outflow of the ground water during the action of the displacer means. The construction includes a solar collector having at least one hydride conduit which is adapted to be exposed to the sun for solar heating to act on the hydride to cause hydrogen to be formed, the pressure of which acts against the displacer means to displace the ground liquid out of the pump chamber. When the solar collector is shielded and the hydride is permitted to cool or is cooled rapidly by the circulation of water thereover, the pressure of the generated hydrogen decreases, permitting ground water to enter into the pumping chamber once again through the suction valves.

Seidel, A.; Wolf, D.

1984-03-27T23:59:59.000Z

313

ERCOT's Dynamic Model of Wind Turbine Generators: Preprint  

SciTech Connect

By the end of 2003, the total installed wind farm capacity in the Electric Reliability Council of Texas (ERCOT) system was approximately 1 gigawatt (GW) and the total in the United States was about 5 GW. As the number of wind turbines installed throughout the United States increases, there is a greater need for dynamic wind turbine generator models that can properly model entire power systems for different types of analysis. This paper describes the ERCOT dynamic models and simulations of a simple network with different types of wind turbine models currently available.

Muljadi, E.; Butterfield, C. P.; Conto, J.; Donoho, K.

2005-08-01T23:59:59.000Z

314

NREL: Technology Deployment - NREL Helps U.S. Virgin Islands Install Wind  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Helps U.S. Virgin Islands Install Wind Testing Equipment NREL Helps U.S. Virgin Islands Install Wind Testing Equipment Photo of wind turbines being erected. NREL's analysis and technical expertise is helping the U.S. Virgin Islands find ways to reduce fossil fuel use by 60% through the development of utility-scale wind opportunities. January 10, 2013 With the help of NREL, the U.S. Virgin Islands (USVI) recently marked a major milestone on the way toward its goal of a 60% reduction in fossil fuel use by 2025. In December, NREL experts assisted with the installation of wind anemometer towers and sonic detection and ranging (SODAR) equipment on the islands of St. Thomas and St. Croix to collect data that will be used for the development of a utility-scale wind project in the territory. The installation represents how the USVI is moving forward with NREL's

315

Data Safer than Ever with FM-200 Installation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation October 22, 2013 - 6:04pm Addthis What does this project do? Goal 2. Preserve, protect, and share records and information The consolidated data center at the Legacy Management Business Center (LMBC) in Morgantown, West Virginia, is now guarded by a state-of-the-art FM-200庐 Fire Suppression System. Installation of the new system began on June 11, 2013, and the system became operational on July 18. FM-200庐 Fire Suppression System The "Clean Agent" system offers several advantages over traditional fire suppression. FM-200 is a clean, colorless, and environmentally friendly fire suppressant that is electronically non-conductive and safe for humans. The fire suppression system extinguishes flames primarily

316

New Jersey SmartStart Buildings - Direct Install Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program < Back Eligibility Commercial Industrial Local Government Nonprofit Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Construction Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Lesser of 70% of project costs or $75,000 per project; annual entity cap of $250,000 Program Info Funding Source New Jersey Societal Benefits Charge (public benefits fund); ARRA State New Jersey Program Type State Rebate Program Rebate Amount Varies Provider c/o TRC Energy Services The Direct Install program offers turn-key energy efficiency solutions to qualified industrial and commercial customers that, with some exceptions,

317

Energy Department Launches SunShot Prize Competition to Install Solar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Prize Competition to Install SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price September 12, 2012 - 2:27pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Energy Department's SunShot Initiative, which is working to make solar energy competitive with other forms of energy without subsidy by the end of the decade, the Energy Department today announced the start of a new competition to make it faster, easier, and cheaper to install rooftop solar energy systems. The SunShot Prize makes a total of $10 million in cash awards available to the first three teams that repeatedly demonstrate the non-hardware costs, or price to plug

318

Y-12 to Install New Fence to Reduce Trespassing | National Nuclear Security  

National Nuclear Security Administration (NNSA)

to Install New Fence to Reduce Trespassing | National Nuclear Security to Install New Fence to Reduce Trespassing | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Field Offices > Welcome to the NNSA Production Office > NPO Press Releases > Y-12 to Install New Fence to Reduce Trespassing Y-12 to Install New Fence to Reduce Trespassing March 28, 2013

319

Largest Solar Panel Installation at a U.S. University Goes Live |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Largest Solar Panel Installation at a U.S. University Goes Live Largest Solar Panel Installation at a U.S. University Goes Live Largest Solar Panel Installation at a U.S. University Goes Live November 4, 2010 - 6:10pm Addthis Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. Sen. Menendez, Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. John Lushetsky A couple of weeks ago, I had the opportunity to participate in a ribbon cutting event for the largest solar installation on a United States university campus. It was an honor to stand with Senator Robert Menendez, Representative Bill Pascrell, university administrators, faculty and students to celebrate William Paterson University's new solar panels. This project will have the capacity to produce 3.5 megawatts of clean

320

Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers Utility Scale Renewable Energy Development Near DOD Installations and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes  

E-Print Network (OSTI)

factors in single-family homes in the U.S." Building andbenefits from filtration in homes and commercial buildings (are being installed in U.S. homes. However, particle removal

Chan, Wanyu Rengie

2014-01-01T23:59:59.000Z

322

Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies  

Energy.gov (U.S. Department of Energy (DOE))

Presentation梘iven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting梒overs a RAND study to develop recommendations for improving Army installation collaboration with utilities to reduce traditional energy usage.

323

Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility  

Office of Energy Efficiency and Renewable Energy (EERE)

Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility at the University of California, Davis in Yolo County, California, as posted on the U.S. Department of Energy website.

324

Behavior of 10 full-scale ground anchors installed in stiff clay  

E-Print Network (OSTI)

Results from load tests conducted on ten, full-scale instrumented ground anchors installed in stiff clay, illustrated that anchor performance is load-history dependent. Anchors having shorter bonded lengths performed significantly better than...

Powers, William Francis

1993-01-01T23:59:59.000Z

325

Net Zero Energy Military Installations: A Guide to Assessment and Planning  

Office of Energy Efficiency and Renewable Energy (EERE)

In 2008, DoD and DOE defined a joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations.

326

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Annual Report on U.S. Wind Power Installation, Cost, and3 U.S. Wind Power Capacity Increased by 27% inAre Significant. . . . . . . 9 Wind Power Prices Are Up in

2008-01-01T23:59:59.000Z

327

Art installation of conic sea and peculiar angels and its affordances  

E-Print Network (OSTI)

Installations attempt to expose everyday space by depicting an environment that appears normal yet has been altered in perceptibly unexpected ways. Such environments are typically designed to re-orient participants, giving them the feeling...

Cooper, Trina Erica

2009-05-15T23:59:59.000Z

328

The LPMS-V installation and operational experience at Arkansas nuclear one  

SciTech Connect

This paper describes a new replacement system for the existing vibrations and loose parts monitoring system for the Arkansas Nuclear One (ANO) units 1 and 2, in Russellville, Arkansas. The installation and operational history are also discussed.

Lexa, A.F. [Babcock and Wilcox Company, Lynchburg, VA (United States)]: Hudson, E. [Entergy Operations, Inc., Russelville, AR (United States)

1995-12-31T23:59:59.000Z

329

Atomic Energy and Radioactive Substances: Licensing and Regulation of Sites: The Nuclear Installations Regulations, 1962  

E-Print Network (OSTI)

These regulations, made by the Minister of Power and the Secretary of State for Scotland acting jointly, prescribe for the purpose of subsection (1)(b) of section one of the Nuclear Installations (Licensing and Insurance) Act, 1959, certain classes...

Wood, Richard; Maclay, John. S.

1962-01-01T23:59:59.000Z

330

Generic TriBITS PRoject, Build, Test, and Install Quick Reference...  

NLE Websites -- All DOE Office Websites (Extended Search)

Generic TriBITS PRoject, Build, Test, and Install Quick Reference Guide Ross Bartlett Oak Ridge National Laboratory CASL-U-2014-0075-000-a CASL-U-2014-0075-000-a Generic TriBITS...

331

Wildlife Photography for Fun and Profit: Constructing and Installing Wildlife Photography Blinds  

E-Print Network (OSTI)

. *Extension Ecotourism Program Specialist, The Texas A&M University System WILDLIFE Photography Miles Phillips* for Fun and Profit: Constructing and Installing Wildlife Photography Blinds B-6187 3/06 Types of Blinds Surface blinds Most photographers...

Phillips, Miles

2006-04-17T23:59:59.000Z

332

Largest On-Campus Solar Facility Being Installed at William Paterson...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

a 1.2 million Recovery Act grant, deploying a new fleet of electric cars, and installing light sensors in buildings. Stephen says the energy savings achieved through the solar...

333

DOE Publishes 20K Hour Testing Results for 2008 GATEWAY Bridge Installation  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy has released a report on the longer-term performance of an LED lighting system that was installed on the I-35W Bridge in Minneapolis in September 2008 and represents...

334

Method for Estimating Loss over Wide Wavelength Region of Fiber Cables Installed in Access Networks  

Science Journals Connector (OSTI)

We propose a simple method for estimating the loss of installed cables to expand WDM access networks. Loss at arbitrary wavelengths can be very accurately predicted from the measured...

Tsujikawa, Kyozo; Takaya, Masaaki; Tomita, Shigeru

335

Data Safer than Ever with FM-200 Installation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation Data Safer than Ever with FM-200 Installation October 22, 2013 - 6:04pm Addthis What does this project do? Goal 2. Preserve, protect, and share records and information The consolidated data center at the Legacy Management Business Center (LMBC) in Morgantown, West Virginia, is now guarded by a state-of-the-art FM-200庐 Fire Suppression System. Installation of the new system began on June 11, 2013, and the system became operational on July 18. FM-200庐 Fire Suppression System The "Clean Agent" system offers several advantages over traditional fire suppression. FM-200 is a clean, colorless, and environmentally friendly fire suppressant that is electronically non-conductive and safe for humans. The fire suppression system extinguishes flames primarily

336

Tracking the Sun V An Historical Summary of the Installed Price  

E-Print Network (OSTI)

Tracking the Sun V An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011 Galen Barbose Na茂m Darghouth Ryan Wiser November 2012 #12;Tracking the Sun V

337

Introduction Minimal generation  

E-Print Network (OSTI)

Introduction Minimal generation Random generation Minimal and probabilistic generation of finite generation of finite groups #12;Introduction Minimal generation Random generation Some motivation Let x1 random elements of G = x1, . . . , xk . (G is the group generated by x1, . . . , xk : all possible

St Andrews, University of

338

Integrated, Automated Distributed Generation Technologies Demonstration  

SciTech Connect

The purpose of the NETL Project was to develop a diverse combination of distributed renewable generation technologies and controls and demonstrate how the renewable generation could help manage substation peak demand at the ATK Promontory plant site. The Promontory plant site is located in the northwestern Utah desert approximately 25 miles west of Brigham City, Utah. The plant encompasses 20,000 acres and has over 500 buildings. The ATK Promontory plant primarily manufactures solid propellant rocket motors for both commercial and government launch systems. The original project objectives focused on distributed generation; a 100 kW (kilowatt) wind turbine, a 100 kW new technology waste heat generation unit, a 500 kW energy storage system, and an intelligent system-wide automation system to monitor and control the renewable energy devices then release the stored energy during the peak demand time. The original goal was to reduce peak demand from the electrical utility company, Rocky Mountain Power (RMP), by 3.4%. For a period of time we also sought to integrate our energy storage requirements with a flywheel storage system (500 kW) proposed for the Promontory/RMP Substation. Ultimately the flywheel storage system could not meet our project timetable, so the storage requirement was switched to a battery storage system (300 kW.) A secondary objective was to design/install a bi-directional customer/utility gateway application for real-time visibility and communications between RMP, and ATK. This objective was not achieved because of technical issues with RMP, ATK Information Technology Department抯 stringent requirements based on being a rocket motor manufacturing facility, and budget constraints. Of the original objectives, the following were achieved: Installation of a 100 kW wind turbine. Installation of a 300 kW battery storage system. Integrated control system installed to offset electrical demand by releasing stored energy from renewable sources during peak hours of the day. Control system also monitors the wind turbine and battery storage system health, power output, and issues critical alarms. Of the original objectives, the following were not achieved: 100 kW new technology waste heat generation unit. Bi-directional customer/utility gateway for real time visibility and communications between RMP and ATK. 3.4% reduction in peak demand. 1.7% reduction in peak demand was realized instead.

Jensen, Kevin

2014-09-30T23:59:59.000Z

339

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network (OSTI)

Investigation of Photovoltaic Cost Trends in California.photovoltaic (PV) systems has increased, so too has the desire to track the installed costPhotovoltaic Power Systems. Figure 13. Comparison of Average Installed Costs (

Barbose, Galen

2011-01-01T23:59:59.000Z

340

Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations  

SciTech Connect

This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

2010-03-09T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Solar hot water system installed at Las Vegas, Nevada. Final report  

SciTech Connect

The solar hot water system installed at LaQuinta Motor Inn Inc., at Las Vegas, Nevada is described. The Inn is a three-story building with a flat roof for installation of the solar panels. The system consists of 1200 square feet of liquid flat plate collectors, a 2500 gallon insulated vertical steel storage tank, two heat exchangers and pumps and controls. The system was designed to supply approximately 74 percent of the total hot water load.

None

1981-01-01T23:59:59.000Z

342

SunShot Installs Solar Energy System on Local Habitat for Humanity Home  

Office of Energy Efficiency and Renewable Energy (EERE)

Working with GRID Alternatives, the nation's largest solar non-profit, DOE's SunShot Initiative team enjoyed a day in the sun on a rooftop in Washington, D.C., where we volunteered to install a solar energy system on a Habitat for Humanity home. GRID installed solar electric systems on 10 affordable homes developed by Habitat for Humanity in the Ivy City neighborhood in Northeast D.C.

343

PART 1 OF TUTORIAL ON EXTREMES TOOLKIT (1) Installation of R software  

E-Print Network (OSTI)

PART 1 OF TUTORIAL ON EXTREMES TOOLKIT (1) Installation of R software R-2.9.2-win32.exe Use default options (2) Installation of Extremes Toolkit extRemes (R package for extreme value analysis): extRemes_1.60.zip ismev (R package used by extRemes): ismev_1.34.zip Lmoments (R package used by extRemes): Lmoments

Katz, Richard

344

Adjudication Concerning the Supply and Installation of an Additional Computer Configuration for the Control System of the CERN Proton Synchroton  

E-Print Network (OSTI)

Adjudication Concerning the Supply and Installation of an Additional Computer Configuration for the Control System of the CERN Proton Synchroton

1973-01-01T23:59:59.000Z

345

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems  

E-Print Network (OSTI)

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

1996-01-01T23:59:59.000Z

346

Creation of equipment for combined-cycle installations桹ne of the priority problems facing power-machinery builders  

Science Journals Connector (OSTI)

Offers of OAO Silovye Mashiny for delivery of equipment for combined-cycle installations (CCIs) of reconstructed and newly...

A. S. Lebedev; G. L. Butalov

2007-04-01T23:59:59.000Z

347

Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint  

SciTech Connect

Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

Oteri, F.; Sinclair, K.

2012-03-01T23:59:59.000Z

348

Microsoft Word - Prosser_generator_cx.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Patricia Smith Project Manager - KEWU-4 Proposed Action: Prosser Hatchery Backup Generator Replacement Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.31 Installation or relocation of machinery and equipment. Location: Prosser, Benton County, WA Proposed by: Bonneville Power Administration (BPA Description of the Proposed Action: BPA proposes to fund the replacement of a backup generator that would supply electricity, when necessary, for operations at Prosser Hatchery. The replacement would involve the removal of the existing generator and demolition of its existing concrete platform (8' x 15'). Demolition would be done by jackhammer, and the concrete

349

Siemens Power Generation | Open Energy Information  

Open Energy Info (EERE)

Generation Generation Jump to: navigation, search Name Siemens Power Generation Place Erlangen, Bavaria, Germany Zip 91058 Product Erlangen-based subsidiary of Siemens AG that develops, manufactures, and installs power plants and related equipment such as turbines. Its fuel cell subsidiary is Siemens Westinghouse. Coordinates 49.59795掳, 11.00258掳 Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":49.59795,"lon":11.00258,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

350

Generation PV Inc | Open Energy Information  

Open Energy Info (EERE)

Generation PV Inc. Generation PV Inc. Place Markham, Ontario, Canada Zip L6E 1A9 Sector Wind energy Product Ontario-based Generation PV distributes and installs PV modules and wind turbines made by outside equipment makers, for industrial, residental and wholesale customers. Coordinates 38.9028掳, -78.001804掳 Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.9028,"lon":-78.001804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

First Wartsila 200 diesel generator set shipped  

SciTech Connect

In early June, Wartsila SACM Diesel shipped its first Wartsila 200 diesel generator set from Mulhouse, France. This 12-cylinder generator set, rated 1870 kW at 1500 r/min, is being installed in India for base-load power generation service on a floating crane. The Cummins Wartsila Engine Company will have the responsibility to continue the development and production of the 200 series engine and a new 170 mm bore series that will be launched in 1996. Marine applications include diesel-electric propulsion, because of high specific output, relatively low cost and compact size of the gen-sets. Other applications include main propulsion for fishing boats, fast ferries and various coastal and inland waterways commercial vessels such as tugs and push boats. 2 figs.

Wadman, B.

1995-09-01T23:59:59.000Z

352

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network (OSTI)

10-100 kW >100 kW Tracking the Sun: The Installed Cost ofout over five years. Tracking the Sun: The Installed Cost ofU.S. from 1998-2007 Tracking the Sun: The Installed Cost of

Wiser, Ryan

2009-01-01T23:59:59.000Z

353

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network (OSTI)

2008 BACK PAGE Tracking the Sun II: The Installed Cost of10-100 kW >100 kW Tracking the Sun II: The Installed Cost ofSystems MW Total Tracking the Sun II: The Installed Cost of

Barbose, Galen L

2010-01-01T23:59:59.000Z

354

Final Technical Report: Development of Post?Installation Monitoring Capabilities  

SciTech Connect

The development of approaches to harness marine and hydrokinetic energy at large?scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under?developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6?meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington. The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger?scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe?illuminated stereooptical camera system suitable for studying near?turbine interactions with marine animals. The camera system underwent short?term field testing at the proposed turbine deployment site and a multi?month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near?turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet?mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.

Polagye, Brian [University of Washington] [University of Washington

2014-03-31T23:59:59.000Z

355

Design of Hanford Site 4th Generation Multi Function Corrosion Monitoring System  

SciTech Connect

This document describes the design of the fourth-generation corrosion monitoring system scheduled to be installed in DST 241-AN-104 early in fiscal year 2001. A fourth-generation multi-function corrosion monitoring system has been designed for installation into a DST in the 241-AN farm at the Hanford Site in FY 2001. Improvements and upgrades from the third-generation system (installed in 241-AN-105) that have been incorporated into the fourth-generation system include: Addition of a built-in water lance to assist installation of probe into tanks with a hard crust layer at the surface of the waste; and Improvement of the electrode mounting apparatus used to attach the corrosion monitoring electrodes to the stainless steel probe body (new design simplifies probe assembly/wiring). These new features improve on the third-generation design and yield a system that is easier to fabricate and install, provides for a better understanding of the relationship between corrosion and other tank operating parameters, and optimizes the use of the riser that houses the probe in the tank.

NORMAN, E.C.

2000-08-30T23:59:59.000Z

356

Utility Solar Generation Valuation Methods  

SciTech Connect

Tucson Electric Power (TEP) developed, tested and verified the results of a new and appropriate method for accurately evaluating the capacity credit of time variant solar generating sources and reviewed new methods to appropriately and fairly evaluate the value of solar generation to electric utilities. The project also reviewed general integrated approaches for adequately compensating owners of solar generation for their benefits to utilities. However, given the limited funding support and time duration of this project combined with the significant differences between utilities regarding rate structures, solar resource availability and coincidence of solar generation with peak load periods, it is well beyond the scope of this project to develop specific rate, rebate, and interconnection approaches to capture utility benefits for all possible utilities. The project developed computer software based evaluation method models to compare solar generation production data measured in very short term time increments called Sample Intervals over a typical utility Dispatch Cycle during an Evaluation Period against utility system load data. Ten second resolution generation production data from the SGSSS and actual one minute resolution TEP system load data for 2006 and 2007, along with data from the Pennington Street Garage 60 kW DC capacity solar unit installed in downtown Tucson will be applied to the model for testing and verification of the evaluation method. Data was provided by other utilities, but critical time periods of data were missing making results derived from that data inaccurate. The algorithms are based on previous analysis and review of specific 2005 and 2006 SGSSS production data. The model was built, tested and verified by in house TEP personnel. For this phase of the project, TEP communicated with, shared solar production data with and collaborated on the development of solar generation valuation tools with other utilities, including Arizona Public Service, Salt River Project, Xcel and Nevada Power Company as well as the Arizona electric cooperatives. In the second phase of the project, three years of 10 second power output data of the SGSSS was used to evaluate the effectiveness of frequency domain analysis, normal statistical distribution analysis and finally maximum/minimum differential output analysis to test the applicability of these mathematic methods in accurately modeling the output variations produced by clouds passing over the SGSSS array.

Hansen, Thomas N.; Dion, Phillip J.

2009-06-30T23:59:59.000Z

357

Second-generation heliostat detail design report  

SciTech Connect

An overview of the Second Generation heliostat design is provided, including a summary of the compliance of the design to the key heliostat requirements. The heliostat hardware is described. The requirements, the hardware and software design used to fulfill these requirements and the analysis and test used to evaluate related performance are presented. The technical feasibility and potential cost savings of a variety of automated mirror inspection techniques are assessed. The installation process design, applicable to both the test units and production, is described. The current maintenance process design is described for the production program. (LEW)

Knowles, R.K.

1980-08-01T23:59:59.000Z

358

Installation Restoration Program. Preliminary assessment/site inspection of the 220th Engineering Installation Squadron, Zanesville Air National Guard Station, Ohio Air National Guard Zanesville, Ohio. Final report  

SciTech Connect

A Preliminary Assessment/Site Inspection was conducted at the 220th Engineering Installation Squadron, Zanesville, Air National Guard Station, Zanesville, Ohio. The Air National Guard Readiness Center/Installation Restoration Program Branch authorized Operational Technologies Corporation to prepare a PA/SI Work Plan and conduct the SI at the Zanesville, ANGS. A PA of the 220th EIS, Zanesville, ANGS, was initiated by ANGRC and Op Tech personnel in November 1993. Information obtained through interviews, review of station records, and field obervations resulted in the identification of two potentially contaminated disposal and/or spill areas. These areas are designated as the Motor Pool Washdown Area of Concern, and the Battery Neutralization AOC. The SI was conducted as outlined in the PA/SI Work Plan submitted in January 1994 and approved in April 1994. The field work commenced at the 220th EIS on 1 June 1994 and was completed on 3 June 1994.

NONE

1995-03-01T23:59:59.000Z

359

Understanding and Managing Generation Y  

E-Print Network (OSTI)

There are four generations in the workplace today; they consist of the Silent Generation, Baby Boom Generation, Generation X, and Generation Y. Generation Y, being the newest generation, is the least understood generation although marketers...

Wallace, Kevin

2007-12-14T23:59:59.000Z

360

Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance.

NONE

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network (OSTI)

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Darghouth, Naim

2012-01-01T23:59:59.000Z

362

NETL: News Release - 99.99% Clean...DOE Signs Agreement to Install Advanced  

NLE Websites -- All DOE Office Websites (Extended Search)

99.99% Clean...DOE Signs Agreement to Install Advanced Pollution Control Device on S. Dakota Power Plant 99.99% Clean...DOE Signs Agreement to Install Advanced Pollution Control Device on S. Dakota Power Plant Leading-Edge System Virtually Eliminates Emissions of Microscopic Ash Particles - Otter Tail's Big Stone Power Plant - South Dakota's Big Stone Plant will soon get an environmental upgrade that will virtually eliminate particulate emissions. Photo: Otter Tail Power Co. MILBANK, SD - By this fall South Dakota will likely host one of the world's cleanest coal plants in terms of the tiny specks of fly ash emitted from its smokestack. A cooperative agreement signed between the U.S. Department of Energy and the Otter Tail Power Company paves the way for installation of a new type of pollution control device on the 450-megawatt Big Stone Power Plant in Milbank, South Dakota.

363

SITEWIDE CATEGORICAL EXCLUSION FOR SAFETY AND SECURITY COMPONENT INSTALLATION AND ALTERATION, PACIFIC NORTHWEST  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SITEWIDE CATEGORICAL EXCLUSION FOR SAFETY AND SECURITY COMPONENT INSTALLATION AND ALTERATION, PACIFIC NORTHWEST NATIONAL LABORATORY, RICHLAND, WASHINGTON Proposed Action: The u.s. Department ofBnergy (DOE) Pacific Northwest Site Office (PNSO) proposes to install. alter, and/or maintain safety and security components to maintain an adequate protective planning stance. Loeation of Action: The proposed action would occur on the Pacific Northwest National Laboratory (PNNL) Site and in the vicinity ofPNNL facilities in the State of Washington. DacriptioD of the Proposed Action: DOE proposes to install, alter, and/or maintain safety and security systems to continue to provide appropriate levels of protection against unauthorized access, theft, diversion, loss

364

CATEGORICAL EXCLUSION TO INSTALL EMSL SUPER-COMPUTER POWER INFRASTRUCTURE, PACIFIC NORTHWEST NATIONAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO INSTALL EMSL SUPER-COMPUTER TO INSTALL EMSL SUPER-COMPUTER POWER INFRASTRUCTURE, PACIFIC NORTHWEST NATIONAL LABORATORY, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to provide enhanced electrical service to the Environmental Molecular Sciences Laboratory (EMSL) to provide an increased power capacity for future facility computational developments. Location of Action: The electrical service would be installed underground via excavation in the lawn and gravel area between EMSL, room 1145, west toward the northeast comer of the Biological Sciences Facility (BSF), in Richland, Washington. The excavation would also extend north-south for about 450 feet along the property line between EMSL and BSF. Please refer to Figure 1.

365

SC: Install units produced by the high performance RTU challenge | The  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Solutions Teams 禄 Space Conditioning 禄 Install units Technology Solutions Teams 禄 Space Conditioning 禄 Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification Activities Technology Solutions Teams Lighting & Electrical Space Conditioning Plug & Process Loads Food Service Refrigeration Laboratories Energy Management & Information Systems Public Sector Teams Market Solutions Teams Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification In January 2011, the U.S. Department of Energy (DOE) joined industry partners in the Better Buildings Alliance to release a design specification for 10-ton capacity commercial air conditioners, also known as rooftop units (RTUs).

366

Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Making the Connection: "Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies" Beth Lachman RAND Corporation Federal Utility Partnership Working Group (FUPWG) Fall 2011, Philadelphia, PA October 26, 2011 Contact Information: Beth Lachman, Phone: 703-413-1100, ext. 5279, E-mail: BETHL@RAND.ORG Motivation for RAND Study * Energy Independence and Security Act of 2007, Energy Policy Act of 2005, and Executive Order 13423 require military installations to - Reduce energy use 30% by 2015 - Increase renewable energy use 7.5% or more by 2013 * Army installations spend significant amounts on energy utilities - Over $1.2 billion spent in 2010 - Energy prices are rising * Collaboration with utility companies, such as with Utility Energy Service Contracts (UESCs), offers

367

ConEd (Gas and Electric) - Small Business Direct Install Program (New York)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ConEd (Gas and Electric) - Small Business Direct Install Program ConEd (Gas and Electric) - Small Business Direct Install Program (New York) ConEd (Gas and Electric) - Small Business Direct Install Program (New York) < Back Eligibility Commercial Savings Category Other Appliances & Electronics Commercial Lighting Lighting Heating & Cooling Commercial Heating & Cooling Program Info State New York Program Type Utility Rebate Program Rebate Amount Energy Survey: Free Programmable Thermostat: Free Equipment Upgrades Identified in Energy Survey: Con Edison will pay up to 70% of the remaining cost directly to the contractor ConEd is providing free energy surveys to its small business customers. The survey will take 30 to 90 minutes and efficiency opportunities and associated costs will be presented on the spot. If the customer agrees to

368

Reviewing Post-Installation and Annual Reports for Federal ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reviewing Post-Installation and Annual Reports Reviewing Post-Installation and Annual Reports For Federal ESPC Projects February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's Web site at www.eere.energy.gov/femp/financing/superespcs_mvresources.html. Contents Reviewing Post-Installation and Annual Reports for Federal ESPC Projects 1 Step 1 - Prepare Custom Report and Checklists from Template 1 Step 2 - Review Project Documentation 2 Step 3 - Complete Checklists 2 Step 4 - Finalize Report 3 Step 5 - Provide Written Review to Agency and DOE 3

369

Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

NONE

1997-09-01T23:59:59.000Z

370

Tracking the Sun VI: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2012  

E-Print Network (OSTI)

Substantially Higher Installed Prices than Rack-Mountedthe median installed price of rack-mounted systems in newsignificantly higher prices than rack-mounted systems, with

Barbose, Galen

2014-01-01T23:59:59.000Z

371

Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mike Aimone, P.E. Mike Aimone, P.E. National Security Global Business Battelle Memorial Institute Utility Scale Renewable Energy Development near DOD Installations Making the Case for Land Use Compatibility Comments expressed are strictly those of the Briefer, and not necessarily the views or positions of the Battelle Memorial Institute or the Department of Defense 2 Sizing the Issue * Utility scale renewable energy development near DOD installations, ranges and Military Operational Areas/Special Use Airspace can affect mission operations and readiness * In the US, Land Use Planning is a "states-right" issue - tied to "Police Powers" - Goal: Acceptable zoning rules and consistent zoning

372

Electrical installations in oil shale mines. Open file report 21 Sep 81-13 Aug 83  

SciTech Connect

This report presents recommended guidelines and regulatory changes applicable to electrical installations in underground oil shale mines. These recommendations are based on information gathered from oil shale operators, government agencies, and other knowledgeable sources familiar with existing plans for mining systems and electrical installations, and on present understanding of the problems and hazards associated with oil shale mining. Additional discussions of specific electrical problems related to oil shale mining include ground fault current levels, permissible electric wheel motors, permissible batteries and electric starting systems, intrinsically safe instrumentation, and applicability of existing test standards.

Gillenwater, B.B.; Kline, R.J.; Paas, N.

1983-08-01T23:59:59.000Z

373

Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)  

SciTech Connect

This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a country抯 safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.

Trond Bjornard; Philip C. Durst

2012-05-01T23:59:59.000Z

374

Operation of a third generation wind turbine  

SciTech Connect

A modern wind turbine was installed on May 26, 1982, at the USDA Conservation and Production Research Laboratory, Bushland, Texas. This wind machine was used to provide electrical energy for irrigation pumping and other agricultural loads. The wind turbine purchased for this research is an Enertech Model 44, manufactured by Enertech Corporation, Norwich, Vermont. The horizontal-axis wind turbine has a 13.4 m diameter, three-bladed, fixed-pitch rotor on a 24.4-m tower. The blades are laminated epoxy-wood, and are attached to a steel hub. A 25-kW induction generator provides 240 V, 60 Hz, single-phase electrical power. The wind turbine operated 64 percent of the time, while being available to operate over 94 percent of the time. The unit had a net energy production of over 80,000 kWh in an average windspeed of 5.9 m/s at a height of 10 m in a 16-month period. The blade pitch was originally offset two degrees from design to maintain power production within the limitations of the gearbox, generator, and brakes. A maximum output of 23.2 kW averaged over a 15-second period indicated that with a new brake, the system was capable of handling more power. After a new brake was installed, the blade pitch was changed to one degree from design. The maximum power output measured after the pitch change was 29.3 kW. Modified blade tip brakes were installed on the wind turbine on July 7, 1983. These tip brakes increased power production at lower windspeeds while reducing power at higher windspeeds.

Vosper, F.C.; Clark, R.N.

1983-12-01T23:59:59.000Z

375

Next Generation Radioisotope Generators | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

禄 Next Generation Radioisotope Generators 禄 Next Generation Radioisotope Generators Next Generation Radioisotope Generators Advanced Stirling Radioisotope Generator (ASRG) - The ASRG is currently being developed as a high-efficiency RPS technology to support future space missions on the Martian surface or in the vacuum of space. This system uses Stirling convertors, which have moving parts to mechanically convert heat to electricity. This power conversion system, if successfully deployed, will reduce the weight of each RPS and the amount of Pu-238 needed per mission. A HISTORY OF MISSION SUCCESSES For over fifty years, the Department of Energy has enabled space exploration on 27 missions by providing safe reliable radioistope power systems and radioisotope heater units for NASA, Navy and Air Force.

376

Xcel Energy Wind and Biomass Generation Mandate | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home 禄 Xcel Energy Wind and Biomass Generation Mandate Xcel Energy Wind and Biomass Generation Mandate < Back Eligibility Investor-Owned Utility Savings Category Bioenergy Wind Buying & Making Electricity Program Info State Minnesota Program Type Renewables Portfolio Standard Provider Minnesota Department of Commerce Minnesota law (Minn. Stat. 搂 216B.2423) requires Xcel Energy to build or contract for 225 megawatts (MW) of installed wind-energy capacity in the state by December 31, 1998, and to build or contract for an additional 200 MW of installed capacity by December 31, 2002. The same statute also directed the Minnesota Public Utilities Commission (PUC) to require Xcel Energy to construct and operate, purchase or contract to purchase an

377

Generation gaps in engineering?  

E-Print Network (OSTI)

There is much enthusiastic debate on the topic of generation gaps in the workplace today; what the generational differences are, how to address the apparent challenges, and if the generations themselves are even real. ...

Kim, David J. (David Jinwoo)

2008-01-01T23:59:59.000Z

378

Modelling and simulation of CO2 (carbon dioxide) bottoming cycles for offshore oil and gas installations at design and off-design conditions  

Science Journals Connector (OSTI)

Abstract Improved energy efficiency is an issue of increasing importance in offshore oil and gas installations. The power on offshore installations is generated by gas turbines operating in a simple cycle. There is an obvious possibility for heat recovery for further power generation from the exhaust heat. However, the limited space and weight available makes the inclusion of bottoming cycles challenging. Due to its high working pressure and thereby compact components CO2 (carbon dioxide) could be a viable solution, combining compactness and efficiency. An in-house simulation tool is used to evaluate the performance of CO2 bottoming cycles at design and off-design conditions. Both a simple recuperated single stage cycle and a more advanced dual stage system are modelled. Results from simulations show a potential for 1011%-points increase in net plant efficiency at 100% gas turbine load. Also off-design simulations taking the variation in heat exchanger performance into account are performed showing that the bottoming cycle improves the off-design performance compared to the standard gas turbine solution. Even at 60% GT (gas turbine) load, the combined cycle with CO2 bottoming cycle can achieve up to 45% net plant efficiency, compared to 31% for only the gas turbine.

Harald Taxt Walnum; Petter Neks; Lars O. Nord; Trond Andresen

2013-01-01T23:59:59.000Z

379

Hydrogen Generation by Electrolysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Better Engineered Solutions. Better Engineered Solutions. What Listening Generates. Better Engineered Solutions. What Listening Generates. Hydrogen Generation by Electrolysis September 2004 Steve Cohen Hydrogen Generation by Electrolysis September 2004 Steve Cohen NREL H 2 Electrolysis - Utility Integration Workshop NREL H 2 Electrolysis - Utility Integration Workshop 2 Hydrogen Generation by Electrolysis Hydrogen Generation by Electrolysis 飦 Intro to Teledyne Energy Systems 飦 H 2 Generator Basics & Major Subsystems 飦 H 2 Generating & Storage System Overview 飦 Electrolysis System Efficiency & Economics 飦 Focus for Attaining DOE H 2 Production Cost Goals 3 Teledyne Energy Systems Locations - ISO 9001 Teledyne Energy Systems Locations - ISO 9001 Hunt Valley, Maryland 飦 State-of-the-art thermoelectric,

380

Installation GuideBola www.landscapeforms.com Ph: 800.521.2546Bike Rack  

E-Print Network (OSTI)

Installation GuideBola庐 www.landscapeforms.com Ph: 800.521.2546Bike Rack HANDLE WITH CARE! Bola for blowing out dust, filling with water, scrubbing, and removing excess water. 3 Place the bike rack back Professionals (APBP) Date: April 2010 Page 1 of 1 3. Place the bike rack back into position and fill the holes

Duchowski, Andrew T.

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Assessing biodiversity conservation conflict on military installations Grace D. Lee Jenni a,  

E-Print Network (OSTI)

Assessing biodiversity conservation conflict on military installations Grace D. Lee Jenni a, , M for biodiversity conservation given the US mili- tary alone manages over 12 million ha of land providing habitat can be addressed by both acknowledging biodiversity conservation conflict exists and allowing dissent

Peterson, M. Nils

382

Reviewing Post-Installation and Annual Reports for Federal ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this document is to provide a framework for implementing uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance reports, produce standardized reviews, and enable centralized tracking of ongoing project performance.

383

Lyman Maynard Stowe Library 1 of 5 PDA Troubleshooting Shots 2006 Install (Windows Mobile 5)  

E-Print Network (OSTI)

Lyman Maynard Stowe Library 1 of 5 PDA Troubleshooting Shots 2006 Install (Windows Mobile 5) Step 1: StrongARM Processor for Pocket PC 2003 and later o Under Pocket PC Mobile 5.0 Shots 2006 CAB File 颅 locate and download (save) the file: Shots 2006 Mobile 5.0 CAB Need Help? CEC 679-8870 #12;Lyman Maynard

Kim, Duck O.

384

Vanadium redox-flow batteries Installation at Ris for characterisation measurements  

E-Print Network (OSTI)

in August 2007. Power systems with high penetration of Wind energy/Renewable energy Renewable energy technologies are being installed at an increasing rate in many countries and regions in order to increase the sustainability of the electricity supply. In some power systems is the level of penetration so high

385

揥hat Efficiency Projects are Being Installed in the Pulp and Paper Industry  

E-Print Network (OSTI)

The Wisconsin Focus on Energy program has seven years of experience on the actual projects that are being installed in the Pulp and Paper industry. The program has a broad perspective on the types and trends of investments in energy efficiency...

Nicol, J.

2008-01-01T23:59:59.000Z

386

Volume XVIII, No. 4 A publication of the U.S. Army Installation Management Agency  

E-Print Network (OSTI)

......................................................................................................... 4-5 Fort Bragg calls on Huntsville Center to fix faulty HVAC systems by Debra Valine 5 Plans Army standards approved for ORTC, AFH by John A. Scharl 11 Army Facility Standardization Program update principles, Installation Design Guides, standards lead the way by Jerry Zekert 17 Army adopts LEED rating

US Army Corps of Engineers

387

Computer Lab Software Installation Policy for the Metropolitan Instructional Support Laboratory  

E-Print Network (OSTI)

Computer Lab Software Installation Policy for the Metropolitan Instructional Support Laboratory Laboratory (MISL) provides computer lab space for faculty, staff and student use as individuals or in classes on lab computers. This policy applies to both stationary and portable lab computers. Policy: Scenario 1

388

Fort Future: Virtual Installation supports rapidly changing needs of armed forces in the field  

E-Print Network (OSTI)

and electric utility modeling and planning tools for the Virtual Instal- lation. For water utilities, Argonne uses the Environmental Protection Agency's EPANet software; for the electrical distribution network-252-6727 psydelko@anl.gov National Security Argonne National Laboratory is a U.S. Department of Energy laboratory

Kemner, Ken

389

Benefits of Stochastic Scheduling for Power Systems with Significant Installed Wind Power  

E-Print Network (OSTI)

Benefits of Stochastic Scheduling for Power Systems with Significant Installed Wind Power Aidan a stochastic element due to the uncertainty of wind power forecasts. By explicitly taking into account the stochastic nature of wind power, it is expected that better schedules should be produced, thereby reducing

390

Transportation Services Fueling Operation Transportation Services has installed a software system that will facilitate fueling of  

E-Print Network (OSTI)

Transportation Services Fueling Operation Transportation Services has installed a software system into this system. All University vehicles that wish to fuel at UH M noa Transportation Services will be required the application below and submit your application to Transportation Services before attempting to fuel your

391

Acoustic Performance of an Installed Real-Time Three-Dimensional Audio System  

Science Journals Connector (OSTI)

The Exterior Effects Room (EER) located at the NASA Langley Research Center is a facility built for psychoacoustic studies of aircraft community noise. Recently the EER was significantly upgraded to allow for simulation of aircraft flyovers in a three-dimensional audio and visual environment. The upgrade included installation of 27 satellite and 4 subwoofer loudspeakers that are driven by a real-time audio server. The audio server employs an implementation of the Vector Base Amplitude Panning (VBAP) method to position virtual sources at arbitrary azimuth and elevation angles in the EER. Real-time application of filters time delays and gains are required to compensate for installation effects including those associated with the irregular room geometry colorization due to varying loudspeaker installations and crossover filtering. The authors previously showed [J. Acoust. Soc. Am. 127 1969 (2010)] that color compensation and crossover filtering could be achieved for satellite and subwoofer loudspeakers. However the resulting FIR filters were too long (32 768 taps) to implement in real-time. The focus of this work is on development of reduced-length surrogate IIR filters and on measurement of the acoustic performance of the installed real-time system.

Kenneth Faller II; Stephen A. Rizzi; Noah Schiller; Randolph Cabell; Jacob Klos; William L. Chapin; Aric R. Aumann

2012-01-01T23:59:59.000Z

392

Acoustic performance of an installed real?time three?dimensional audio system.  

Science Journals Connector (OSTI)

The Exterior Effects Room (EER) located at the NASA Langley Research Center is a facility built for psychoacoustic studies of aircraft community noise. Recently the EER was significantly upgraded to allow for simulation of aircraft flyovers in a 3?D audio and visual environment. The upgrade included installation of 27 satellite and 4 subwooferloudspeakers that are driven by a real?time audio server. The audio server employs an implementation of the vector base amplitude panning method to position virtual sources at arbitrary azimuth and elevation angles in the EER. Real?time application of filters time delays and gains are required to compensate for installation effects including those associated with the irregular room geometry colorization due to varying loudspeaker installations and crossover filtering. The authors previously showed [J. Acoust. Soc. Am. 127 1969 (2010)] that color compensation and crossover filtering could be achieved for satellite and subwooferloudspeakers. However the resulting FIR filters were too long (32?768 taps) to implement in real?time. The focus of this work is on the development of reduced?length surrogate IIR filters and on the measurement of the acoustic performance of the installed real?time system.?

Kenneth J. Faller II; Stephen A. Rizzi; Noah Schiller; Randolph H. Cabell; Jacob Klos; William L. Chapin; Fahri Surucu

2010-01-01T23:59:59.000Z

393

Secure Safety: Secure Remote Access to Critical Safety Systems in Offshore Installations  

Science Journals Connector (OSTI)

Safety Instrumented Systems (SIS) as defined in IEC 61508 and IEC 61511 are very important for the safety of offshore oil & natural gas installations. SIS typically include the Emergency Shutdown System (ESD) that ensures that process systems return ... Keywords: Offshore, Process Control, Safety Instrumented Systems, Secure remote access

Martin Gilje Jaatun; Tor Olav Gr鴗an; Maria B. Line

2008-06-01T23:59:59.000Z

394

Active solar-energy-system design, installation, and maintenance manual. Final report, April 1984-March 1986  

SciTech Connect

This manual provides project managers, engineers, and operations and maintenance personnel with information on designing, installing, and maintaining active solar energy systems for a variety of applications at Air Force facilities. These systems include domestic hot water, industrial process heat, space heating, space cooling, and swimming-pool heating systems.

Diamond, S.C.; Avery, J.G.; Wood, C.

1986-04-01T23:59:59.000Z

395

ANACAP-U software configuration and installation verification on the SECC  

SciTech Connect

ANACAP-U is a preprocessor, postprocessor, and concrete material subroutine used for the analysis of concrete structures. ANACAP-U functions in concert with the ABAQUS general purpose finite-element code. This document describes the Quality Assurance process for ANACAP-U version 9-2.2.7 as installed on the SECC.

Marlow, R.S.

1994-09-27T23:59:59.000Z

396

UCI Replay Install on Your Computer Go to http://replay.uci.edu/download.php  

E-Print Network (OSTI)

UCI Replay Install on Your Computer Go to http://replay.uci.edu/download.php A service Relay program to begin 5 For help recording see the "Using the Recorder" guide at http://replay.uci.edu/getstarted.php://replay.uci.edu/pdfs/EEEPodcasts.pdf Guides 颅 http://replay.uci.edu/getstarted.php Troubleshooting 颅 http://replay.uci.edu/troubleshooting.php

Brody, James P.

397

UCI Replay Install on Your USB Drive Go to http://replay.uci.edu/download.php  

E-Print Network (OSTI)

UCI Replay Install on Your USB Drive Go to http://replay.uci.edu/download.php A service For help recording see the "Portable Recorder" guide at http://replay.uci.edu/getstarted.php Follow your) 颅 http://replay.uci.edu/pdfs/EEEPodcasts.pdf Guides 颅 http://replay.uci.edu/getstarted.php

Brody, James P.

398

Measure Guideline: Installing Rigid Foam Insulation on the Interior of Existing Brick Walls  

SciTech Connect

This measure guideline provides information on an effective method to insulate the interior of existing brick masonry walls with extruded polystyrene (XPS) insulation board. The guide outlines step-by-step design and installation procedures while explaining the benefits and tradeoffs where applicable. The authors intend that this document be useful to a varied audience that includes builders, remodelers, contractors and homeowners.

Natarajan, H.; Klocke, S.; Puttagunta, S.

2012-06-01T23:59:59.000Z

399

FIS Technical Services Page 1 5/23/2006 RPM Installation  

E-Print Network (OSTI)

FIS Technical Services Page 1 5/23/2006 RPM Installation Version 4.5.1.11 Revised: April 2005 clicking on an empty space on your desktop and choosing "new" and then "folder"). 2. Visit http://www.fis Desktop using the drop down menu next to the Save in text box as in the image below. #12;FIS Technical

Sibille, Etienne

400

Optimisation de pilotage d'installation rsidentielle de chauffage par micro-cognration  

E-Print Network (OSTI)

and Power (mCHP), Energy management, Optimization. 1. INTRODUCTION La production locale d'茅lectricit茅 chez tarifaires dans le temps pour optimiser sa production et sa consommation propres. 2. MICRO-COGENERATION POUROptimisation de pilotage d'installation r茅sidentielle de chauffage par micro- cog茅n茅ration

Paris-Sud XI, Universit茅 de

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Opportunities for improving regulations governing the seismic safety of large nuclear installations  

Energy.gov (U.S. Department of Energy (DOE))

Opportunities for Improving Regulations Governing the Seismic Safety of Large Nuclear Installations Robert J. Budnitz, Ph.D. LBNL University of California, Berkeley, CA 94720 Andrew S. Whittaker, Ph.D., S.E. MCEER University at Buffalo, Buffalo, NY 14260

402

EVALUATION OF A PROTOTYPE SOLAR AWNING A prototype solar awning has been designed and installed on  

E-Print Network (OSTI)

and installed on a University of Oregon campus building. The solar awning is composed of a light shelfEVALUATION OF A PROTOTYPE SOLAR AWNING ABSTRACT A prototype solar awning has been designed with photovoltaic modules at- tached tilted 20掳 to the south. An interior light shelf and LED lights have been

Oregon, University of

403

Second generation heliostat development for solar central receiver systems detailed design report. Volume II. Appendices  

SciTech Connect

Presented are the design of the second generation heliostat, the development of the manufacturing plan, the method of transporting the heliostats from the factory to the installation site, heliostat installation procedures, and the maintenance routines. These plans are then cost estimated to provide inputs required to develop the installed cost of the heliostat and further, the cost of owning, operating and maintaining a collector field. This volume contains the following appendices: (1) bill of materials; (2) part drawings (subassemblies); (3) assembly drawings, heliostat; (4) trade studies; (5) system studies; (6) control software; (7) test results; (8) specification S-102: surface preparation, application, and inspection of protective coatings for carbon steel heliostat piles; and (9) specification S-101: installation of open end pipe piles. (WHK)

Not Available

1980-05-01T23:59:59.000Z

404

Energy Generation Project Permitting (Vermont) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Project Permitting (Vermont) Generation Project Permitting (Vermont) Energy Generation Project Permitting (Vermont) < Back Eligibility Construction Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Environmental Regulations Provider Agency of Natural Resources The Vermont Energy Generation Siting Policy Commission is mandated to survey best practices for siting approval of electric generation projects (all facilities except for net- and group-net-metered facilities) and for public participation and representation in the siting process, and to report to the Governor and to the Vermont Legislature on their findings by

405

U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), September 2003  

Energy.gov (U.S. Department of Energy (DOE))

Chart of Database of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC)

406

Predicting underwater radiated noise levels due to the first offshore wind turbine installation in the United States  

Science Journals Connector (OSTI)

Noise generated by offshore impact pile driving radiates into the air water and sediment. Predicting noise levels around the support structures at sea is required to estimate the effects of the noise on marine life. Based on high demands developing renewable energy source the United States will begin the first pile driving within one to two years. It is necessary to investigate acoustic impact using our previously verified coupled Finite Element (Commercial FE code Abaqus) and Monterey Miami Parabolic Equation (2D MMPE) models [J. Acoust. Soc. Am. 131(4) 3392 (2012)]. In the present study we developed a new coupled FE-MMPE model for the identification of zone of injury due to offshore impact pile driving. FE analysis produced acoustic pressure outputs on the surface of the pile which are used as a starting field for a long range 2D MMPE propagation model. It calculates transmission loss for N different azimuthal directions as function of distance from the location of piling with the inputs of corresponding bathymetry and sediment properties. We will present predicted zone of injury by connecting N different distances of equivalent level fishes may get permanent injury due to the first offshore wind farm installation in the United States.

James H. Miller

2013-01-01T23:59:59.000Z

407

Predicting underwater radiated noise levels due to the first offshore wind turbine installation in the U.S.  

Science Journals Connector (OSTI)

Noise generated by offshore impact pile driving radiates into the air water and sediment. Predicting noise levels around the support structures at sea is required to estimate the effects of the noise on marine life. Based on high demands developing renewable energy source the United States will begin the first pile driving within one to two years. It is necessary to investigate acoustic impact using our previously verified coupled Finite Element (Commercial FE code Abaqus) and Monterey Miami Parabolic Equation (2D MMPE) models (J. Acoust. Soc. Am. 131(4) p. 3392 2012). In the present study we developed a new coupled FE-MMPE model for the identification of zone of injury due to offshore impact pile driving. FE analysis produced acoustic pressure outputs on the surface of the pile which are used as a starting field for a long range 2D MMPE propagation model. It calculates transmission loss for N different azimuthal directions as function of distance from the location of piling with the inputs of corresponding bathymetry and sediment properties. We will present predicted zone of injury by connecting N different distances of equivalent level fishes may get permanent injury due to the first offshore wind farm installation in the U.S..

Huikwan Kim; James H. Miller; Gopu R. Potty

2013-01-01T23:59:59.000Z

408

ENERGY GENERATION RESEARCH PIER Energy Generation Research  

E-Print Network (OSTI)

ENERGY GENERATION RESEARCH PIER Energy Generation Research www.energy.ca.gov/research/ renewable/ November 2010 Sonoma County RESCO A Local Level Approach to Renewable Energy Portfolios. The Issue To address energy usage that contributes to climate change, California has enacted legislation to guide

409

Gamma ray generator  

DOE Patents (OSTI)

An embodiment of a gamma ray generator includes a neutron generator and a moderator. The moderator is coupled to the neutron generator. The moderator includes a neutron capture material. In operation, the neutron generator produces neutrons and the neutron capture material captures at least some of the neutrons to produces gamma rays. An application of the gamma ray generator is as a source of gamma rays for calibration of gamma ray detectors.

Firestone, Richard B; Reijonen, Jani

2014-05-27T23:59:59.000Z

410

Elimination of Competition and Duplication of Electricity Generation and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elimination of Competition and Duplication of Electricity Elimination of Competition and Duplication of Electricity Generation and Transmission Facilities (Nebraska) Elimination of Competition and Duplication of Electricity Generation and Transmission Facilities (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info

411

Generation to Generation: The Heart of Family Medicine  

E-Print Network (OSTI)

Ageism in the Workplace. Generations Spring, 5. Westman,of caring for multiple generations simultaneously. StronglyGeneration to Generation: The Heart of Family Medicine

Winter, Robin O

2012-01-01T23:59:59.000Z

412

INSTALLATION CERTIFICATE CF-6R-MECH-08 Ice Storage Air Conditioning (ISAC) Units (Page 1 of 2)  

E-Print Network (OSTI)

cooling with the compressor). Yes No #12;INSTALLATION CERTIFICATE CF-6R-MECH-08 Ice Storage AirINSTALLATION CERTIFICATE CF-6R-MECH-08 Ice Storage Air Conditioning (ISAC) Units (Page 1 of 2) Site Address: Enforcement Agency: Permit Number: 2008 Residential Compliance Forms August 2009 Ice Storage Air

413

GHPGHPGHPGHPGHPsPayforThemselvessPayforThemselvessPayforThemselvessPayforThemselvessPayforThemselves The world's largest installation of geothermal heat  

E-Print Network (OSTI)

ThemselvessPayforThemselvessPayforThemselvessPayforThemselvessPayforThemselves The world's largest installation of geothermal heat pumps has proven that this technology can deliver big savings resulting from the retrofit. Geothermal heat pumps (GHPs) were installed in a comprehensive energy their qualifications to build and finance successful GHP-centered projects. (Geothermal heat pumps are also known

Oak Ridge National Laboratory

414

INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1)  

E-Print Network (OSTI)

INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment (Page 1 of 1) Site Verification of High EER Equipment Procedures for verification of High EER Equipment are described in Reference or Identification/Tag 2 System Location or Area Served 3 Certified EER Rating of the installed equipment (Btu

415

Pantex installs new meters to help to reduce energy consumption | National  

NLE Websites -- All DOE Office Websites (Extended Search)

meters to help to reduce energy consumption | National meters to help to reduce energy consumption | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new meters to help to ... Pantex installs new meters to help to reduce energy consumption Posted By Office of Public Affairs Project Manager Janice Clark gives a safety briefing.

416

Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Schools Assessment and Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools J. Coughlin and A. Kandt National Renewable Energy Laboratory Technical Report NREL/TP-7A40-51815 October 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools J. Coughlin and A. Kandt National Renewable Energy Laboratory Prepared under Task No. SM10.18J1

417

PV Installation Labor Market Analysis and PV JEDI Tool Developments (Presentation), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

PV Installation Labor Market Analysis PV Installation Labor Market Analysis and PV JEDI Tool Developments Barry Friedman NREL Strategic Energy Analysis Center May 16, 2012 World Renewable Energy Forum Denver, Colorado NREL/PR-6A20-55130 NATIONAL RENEWABLE ENERGY LABORATORY Disclaimer 2 DISCLAIMER AGREEMENT These information ("Data") are provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy LLC ("Alliance") for the U.S. Department of Energy (the "DOE"). It is recognized that disclosure of these Data is provided under the following conditions and warnings: (1) these Data have been prepared for reference purposes only; (2) these Data consist of forecasts, estimates or assumptions made on a best-

418

Net Zero Energy Military Installations: A Guide to Assessment and Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Zero Energy Military Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Technical Report NREL/TP-7A2-48876 August 2010 Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment and Planning Samuel Booth, John Barnett, Kari Burman, Josh Hambrick and Robert Westby Prepared under Task No. IDOD.1010 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

419

Electric Vehicle Grid Integration for Sustainable Military Installations (Presentation), National Renewable Energy Laboratory (NREL)  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Vehicle Grid Integration for Electric Vehicle Grid Integration for Sustainable Military Installations NDIA Joint Service Power Expo Mike Simpson Mike.Simpson@NREL.gov 5 May 2011 NREL/PR-5400-51519 NATIONAL RENEWABLE ENERGY LABORATORY Agenda 2 1. NREL Transportation Research 2. Net Zero Energy Installations (NZEI) 3. Fort Carson as a Case Study - Vehicles On-Site - Utility Operations - Vehicle Charge Management 4. Full Fleet Simulation 5. Continuing Work NATIONAL RENEWABLE ENERGY LABORATORY NREL is the only national laboratory solely dedicated to advancing renewable energy and energy efficiency. Our employees are committed to building a cleaner, sustainable world. Photo Credits: NREL 3 NATIONAL RENEWABLE ENERGY LABORATORY What is Electric Vehicle Grid Integration (EVGI)? 4 Cross Cutting Enablers Grid / Renewables

420

Pantex installs new meters to help to reduce energy consumption | National  

National Nuclear Security Administration (NNSA)

meters to help to reduce energy consumption | National meters to help to reduce energy consumption | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new meters to help to ... Pantex installs new meters to help to reduce energy consumption Posted By Office of Public Affairs Project Manager Janice Clark gives a safety briefing.

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

INSTALLATION MAG~NiX.ILRI DIVI8ION, CAN.fAN,CONN.  

Office of Legacy Management (LM)

INSTALLATION INSTALLATION MAG~NiX.ILRI DIVI8ION, CAN.fAN,CONN. .PERI,jD Aiq~+ 1, i950 TO: August 31, 195 .:\,.:. ,,., WORK SHEET FOR: I b WSIGNOR I. v DowChemical Go. Velasco, Texas ., Azlterprise Meetala cc Brooklyn, New York Meili $Worthin&m Hatboro, ?'a. LOT NO. '... I [ATERIAL SYnB,fJL KEASURED' NET WT. 100,007~ ( 4;020 I ! 19 ~, ANALYBIS % METAL/100 r, Noi. 23) METAL CONTENT INSTRUCTIONS: This sheet% will be Used.ln.preDarlng Haterlal Balance. 'The totals from the various ltams listed above ~111 be Inserted on the Material Balance Summary Sheet. Shipments ~111 he llated on this Work'Sheet separately With the-ConsIgnor and Consignee of each Shipment noted; Copies Of thls sheet ~111 accompany the naterlal Balance Summary Sheet at the end of the'month.

422

Energy Saving 'Cool Roofs' Installed at Y-12 | Y-12 National Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Saving 'Cool ... Saving 'Cool ... Energy Saving 'Cool Roofs' Installed at Y-12 Posted: October 17, 2012 - 4:08pm The Y-12 National Security Complex has taken additional steps to reduce its energy costs by installing almost 100,000 square feet of new heat reflective "cool" roofs at the Oak Ridge, Tennessee facility. The latest Y-12 cool roofs were added to Buildings 9204-2E and 9103. Fifteen percent of roofs at Y-12 are currently equipped with cool roof technology. This technology is expected to be applied to the majority of the roofs at Y-12. "Replacing older, heat-absorbing roofs with the heat-reflective cool roofs is part of NNSA's strategy to achieve energy and cost efficiencies," said Robert "Dino" Herrera, Facilities and Infrastructure Recapitalization Program Manager. "We strive to lead the

423

Apparatus for installing condition-sensing means in subterranean earth formations  

DOE Patents (OSTI)

The present invention is directed to an apparatus for installing strain gages or other sensors-transducers in wellbores penetrating subterranean earth formations. The subject apparatus comprises an assembly which is lowered into the wellbore, secured in place, and then actuated to sequentially clean the wellbore or casing surface at a selected location with suitable solvents, etchants and neutralizers, grind the surface to a relatively smooth finish, apply an adhesive to the surface, and attach the strain gages or the like to the adhesive-bearing surface. After installing the condition-sensing gages to the casing or earth formation the assembly is withdrawn from the wellbore leaving the sensing gages securely attached to the casing or the subterranean earth formation.

Shuck, Lowell Z. (Morgantown, WV)

1981-01-01T23:59:59.000Z

424

The design, installation, and performance of a berm-supported exploration structure in the Beaufort Sea  

SciTech Connect

The design, installation, and performance of a berm-supported exploration structure in a dynamic ice environment is presented. Details are provided on design considerations which include horizontal ice loads, wave loads, seismic considerations, foundation characteristics and extreme temperatures. The development of specifications and installation techniques to account for these design concerns is presented. A case history is presented which includes a discussion of on-site modifications to the idealized placement technique, which were necessitated by extreme ice conditions. The success of this modified placement technique is confirmed through a review of the unit performance during the drilling season, and the response of the structure to dynamic ice and drilling-related activity is examined.

Hewitt, K.J.; Berzing, W.E.; Fitzpatrick, J.P.; Hogeboom, H.G.

1985-06-01T23:59:59.000Z

425

Microsoft Word - CX-RossComplexComcastFiberInstall_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2011 30, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Realty Specialist - TERR-LMT Proposed Action: Allow installation of new fiber optic cable PP&A Project No.: 1866 Budget Information: Work Order # 00184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. Location: Ross Complex, Vancouver, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow Comcast Cable Communications, Inc. (Comcast) to install fiber optic cable to the existing T-Mobile cellular facility located at the

426

Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned from Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations Michael Callahan, Kate Anderson, Sam Booth, Jessica Katz, and Tim Tetreault Technical Report NREL/TP-7A40-51598 Revised September 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations Michael Callahan, Kate Anderson, Sam Booth, Jessica Katz, and Tim Tetreault

427

DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY  

Office of Legacy Management (LM)

DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY Prepared for the U.S. Department of Energy by Westinghouse Electric Corporation West Mifflin, Pennsylvania 15122-0079 i' Vendor Contract Number: DE-ACll-76PN00014 : IAELE OF CONTENTS I. Executive Summary ............................................. 2. Introduction .................................................. a. Background......;.........................................i b. Authority .......................................................... : ; c. Purpose I ........................................................ 3 d Scope..................................................~..! e: Methodology...............................................! ........

428

Thermal Performance Impacts of Center-of-Glass Deflections in Installed  

NLE Websites -- All DOE Office Websites (Extended Search)

Thermal Performance Impacts of Center-of-Glass Deflections in Installed Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating Glazing Units Title Thermal Performance Impacts of Center-of-Glass Deflections in Installed Insulating Glazing Units Publication Type Journal Article LBNL Report Number LBNL-5800E Year of Publication 2012 Authors Hart, Robert, Howdy Goudey, Dariush K. Arasteh, and Dragan C. Curcija Journal Energy and Buildings Volume 54 Issue November 2012 Pagination 453-460 Date Published 11/2012 Keywords concave, convex, deflection, field test, gap, insulating glass unit, thermal performance, thermal transmittance, u-factor Abstract This study examines the thermal performance impact of center-of-glass (COG) deflections in double- and triple-pane insulating glass units (IGUs) installed at several locations throughout the US. Deflection was measured during summer and winter temperatures; the results show that outdoor temperature variations can be represented a linear change in COG gap width in double- and triple-pane IGUs within the temperature ranges measured. However, the summer-winter temperature-induced deflection is similar in magnitude to the observed spread in COG deflection of similar units at the same temperature, which suggests that factors other than temperature are of equal importance in determining the in-situ deflection of windows. The effect of deflection on thermal performance depends on the IGU's designed gap. Units constructed with smaller-than-optimal gaps often exhibit significant U-factor change due to temperature-induced reduction in gap width. This effect is particularly problematic in high-performance triple glazing where small gap dimension changes can have a large impact on performance.

429

Initial weights and dimensions of corrosion coupons installed in IDMS in August 1993  

SciTech Connect

New corrosion coupons were installed in the Feed Preparation System and the Melter/Off-Gas System of Integrated DWPF Melter System (IDMS) in August 1993. The new coupons are replacements for similar coupons which were in the IDMS since 1989 but were removed for metallurgical evaluation in April 1993. original coupons still remain on the corrosion racks in the Melter and the Off-Gas Stack. Baseline data for the replacement coupons are described in this report.

Imrick, K.

1993-10-04T23:59:59.000Z

430

Development of a Web-based Emissions Reduction Calculator for Solar Thermal and Solar Photovoltaic Installations  

E-Print Network (OSTI)

DEVELOPMENT OF A WEB-BASED EMISSIONS REDUCTION CALCULATOR FOR SOLAR THERMAL AND SOLAR PHOTOVOLTAIC INSTALLATIONS Juan-Carlos Baltazar Research Associate Jeff S. Haberl, Ph.D., P.E. Professor/Associate Director Don R. Gilman, P.E. Senior... the potential emission reductions due to the electricity savings from the application of some of the most common solar thermal and solar photovoltaic systems. The methodology to estimate the potential NOx emission reduction integrates legacy analysis tools...

Baltazar-Cervantes, J. C.; Gilman, D.; Haberl, J. S.; Culp, C.

2005-01-01T23:59:59.000Z

431

Annual Radiological Environmental Monitoring Program Report for the Fort St. Vrain Independent Spent Fuel Storage Installation  

SciTech Connect

This report presents the results of the 2001 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Fort St. Vrain Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the predominant radiation exposure pathway, direct and scattered radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.

Hall, Gregory Graham; Newkirk, Jay Ronald; Borst, Frederick Jon

2002-02-01T23:59:59.000Z

432

Annual Radiological Environmental Monitoring Program Report for the Fort St. Vrain Independent Spent Fuel Storage Installation  

SciTech Connect

This report presents the results of the 2002 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Fort St. Vrain Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the predominant radiation exposure pathway, direct and scattered radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.

Jay R. Newkirk; Frederick J. Borst; Gregory G. Hall

2003-02-01T23:59:59.000Z

433

Projektarbeit Basisjahr 2010 12. Mrz 2010 Installation von Bluetooth-Dongle und Serial-Port  

E-Print Network (OSTI)

Projektarbeit Basisjahr 2010 12. M盲rz 2010 Installation von Bluetooth-Dongle und 颅Serial-Port Mini CD 路 Dongle anbringen Im Ger盲te Manager 眉berpr眉fen 路 BlueSoleil starten Serial Port 路 Ger盲t Parani. Benutzt dazu eine B眉roklammer und dr眉ckt einige Zeit auf auf dem Bluetooth COM- Port. 路 Merkt

434

Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation  

SciTech Connect

The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, and Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.

Zaltash, Abdolreza [ORNL

2007-09-01T23:59:59.000Z

435

INFO-F-309 Administration des Systmes TP1: Installation de Linux et gestion des packages  

E-Print Network (OSTI)

virtuelle avant de la lancer pour mon- ter l'image .iso disponible dans le r茅pertoire /serveur/logicielles/tpINFO-F-309 颅 Administration des Syst猫mes TP1: Installation de Linux et gestion des packages trouverez l(es) image(s) du TP dans le r茅pertoire : /serveur/logicielles/tp-adminsys/partie1 Ce r茅pertoire

Collette. S茅bastien

436

Observations on A Technology Roadmap for Generation IV Nuclear Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Observations on A Technology Roadmap for Generation IV Nuclear Observations on A Technology Roadmap for Generation IV Nuclear Energy Systems: Technical Roadmap Report Observations on A Technology Roadmap for Generation IV Nuclear Energy Systems: Technical Roadmap Report The development of advanced nuclear energy systems in the U.S. will depend greatly on the continued success of currently operating light water nuclear power plants and the ordering of new installations in the short term. DOE needs to give those immediate objectives the highest priority and any additional support they require to assure their success. DOE is pursuing two initiatives to encourage a greater use of nuclear energy systems. The initiatives have been reviewed by NERAC Subcommittee on Generation IV Technology Planning (GRNS) and they are: * A Near Term Development (NTD) Roadmap which is in the process of being

437

Investment and Upgrade in Distributed Generation under Uncertainty  

NLE Websites -- All DOE Office Websites (Extended Search)

Investment and Upgrade in Distributed Generation under Uncertainty Investment and Upgrade in Distributed Generation under Uncertainty Speaker(s): Afzal Siddiqui Karl Maribu Date: September 4, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose The ongoing deregulation of electricity industries worldwide is providing incentives for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via heat exchangers (HXs) to meet local energy loads. Although the electric-only effciency of DG is lower than that of central-station production, relatively high tariff rates and the potential for CHP applications increase the attractiveness of on-site generation. Nevertheless, a microgrid contemplating the installation of gas-fired DG has to be aware of the uncertainty in the

438

Electrical Generation Tax Reform Act (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Tax Reform Act (Montana) Generation Tax Reform Act (Montana) Electrical Generation Tax Reform Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Institutional Multi-Family Residential Systems Integrator Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Fees Provider Montana Department of Revenue This Act reforms taxes paid by electricity generators to reduce tax rates and imposes replacement taxes in response to the 1997 restructuring of the

439

Regional variations in the health, environmental, and climate benefits of wind and solar generation  

Science Journals Connector (OSTI)

...a 1-MW wind turbine will offset more...than a 1-MW solar installation...demand is high and gas is more often...resource, a wind turbine on the plains...emissions than a turbine in West Virginia...benefits when wind or solar displace coal...rather than gas-fired, generators...

Kyle Siler-Evans; In阺 Lima Azevedo; M. Granger Morgan; Jay Apt

2013-01-01T23:59:59.000Z

440

Contaminant-Generation Mechanisms  

Science Journals Connector (OSTI)

In the last chapter, the areas where contaminants are generated were discussed. Knowing the location of contaminant generation is helpful in controlling that contamination, but understanding the mechanisms is ...

Alvin Lieberman

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

X-Ray Generators  

Science Journals Connector (OSTI)

There are many types of X-ray generators sold commercially. The following are some of ... that should be considered when selecting a particular generator for a particular purpose. All the companies listed below s...

Reuben Rudman

1972-01-01T23:59:59.000Z

442

Geothermal Power Generation  

SciTech Connect

The report provides an overview of the renewed market interest in using geothermal for power generation including a concise look at what's driving interest in geothermal power generation, the current status of geothermal power generation, and plans for the future. Topics covered in the report include: an overview of geothermal power generation including its history, the current market environment, and its future prospects; an analysis of the key business factors that are driving renewed interest in geothermal power generation; an analysis of the challenges that are hindering the implementation of geothermal power generation projects; a description of geothermal power generation technologies; a review of the economic drivers of geothermal power generation project success; profiles of the major geothermal power producing countries; and, profiles of the major geothermal power project developers.

NONE

2007-11-15T23:59:59.000Z

443

FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN STATE UNIVERSITY  

SciTech Connect

The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) is performing a feasibility analysis on installing a state-of-the-art circulating fluidized bed (CFB) boiler and ceramic filter emission control device at Penn State's University Park campus for cofiring multiple biofuels and other wastes with coal, and developing a test program to evaluate cofiring multiple biofuels and coal-based feedstocks. Penn State currently operates an aging stoker-fired steam plant at its University Park campus and has spent considerable resources over the last ten to fifteen years investigating boiler replacements and performing life extension studies. This effort, in combination with a variety of agricultural and other wastes generated at the agricultural-based university and the surrounding rural community, has led Penn State to assemble a team of fluidized bed and cofiring experts to assess the feasibility of installing a CFB boiler for cofiring biomass and other wastes along with coal-based fuels. The objective of the project is being accomplished using a team that includes personnel from Penn State's Energy Institute and the Office of Physical Plant, Foster Wheeler Energy Services, Inc., and Cofiring Alternatives.

Bruce G. Miller; Sharon Falcone Miller; Robert Cooper; Douglas Donovan; John Gaudlip; Matthew Lapinsky; William Serencsits; Neil Raskin; Dale Lamke; Joseph J. Battista

2001-03-31T23:59:59.000Z

444

FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN STATE UNIVERSITY  

SciTech Connect

The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) is performing a feasibility analysis on installing a state-of-the-art circulating fluidized bed (CFB) boiler and ceramic filter emission control device at Penn State's University Park campus for cofiring multiple biofuels and other wastes with coal, and developing a test program to evaluate cofiring multiple biofuels and coal-based feedstocks. Penn State currently operates an aging stoker-fired steam plant at its University Park campus and has spent considerable resources over the last ten to fifteen years investigating boiler replacements and performing life extension studies. This effort, in combination with a variety of agricultural and other wastes generated at the agricultural-based university and the surrounding rural community, has led Penn State to assemble a team of fluidized bed and cofiring experts to assess the feasibility of installing a CFB boiler for cofiring biomass and other wastes along with coal-based fuels. The objective of the project is being accomplished using a team that includes personnel from Penn State's Energy Institute, Office of Physical Plant, and College of Agricultural Sciences; Foster Wheeler Energy Services, Inc.; Parsons Energy and Chemicals Group, Inc.; and Cofiring Alternatives.

Bruce G. Miller; Sharon Falcone Miller; Robert Cooper; Douglas Donovan; John Gaudlip; Matthew Lapinsky; William Serencsits; Neil Raskin; Tom Steitz

2002-07-12T23:59:59.000Z

445

FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN STATE UNIVERSITY  

SciTech Connect

The Pennsylvania State University, under contract to the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) is performing a feasibility analysis on installing a state-of-the-art circulating fluidized bed (CFB) boiler and ceramic filter emission control device at Penn State's University Park campus for cofiring multiple biofuels and other wastes with coal, and developing a test program to evaluate cofiring multiple biofuels and coal-based feedstocks. Penn State currently operates an aging stoker-fired steam plant at its University Park campus and has spent considerable resources over the last ten to fifteen years investigating boiler replacements and performing life extension studies. This effort, in combination with a variety of agricultural and other wastes generated at the agricultural-based university and the surrounding rural community, has led Penn State to assemble a team of fluidized bed and cofiring experts to assess the feasibility of installing a CFB boiler for cofiring biomass and other wastes along with coal-based fuels.

Bruce G. Miller; Sharon Falcone Miller; Robert Cooper; Douglas Donovan; John Gaudlip; Matthew Lapinsky; William Serencsits; Neil Raskin; Dale Lamke

2001-10-12T23:59:59.000Z

446

A Generative Dependency Grammar  

Science Journals Connector (OSTI)

We propose a new kind of grammar: the Generative Dependency Grammar (GDG) based on dependency trees (DT) and a generative process. By generating a surface text using these GDG, the DT of the text is obtained too. GDG formalism is starting to be used ...

Stefan Diaconescu

2002-08-01T23:59:59.000Z

447

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

SciTech Connect

During the period July 1, 2001--September 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) continued construction of the Willow Island cofiring project, completed the installation of the fuel storage facility, the fuel receiving facility, and the processing building. All mechanical equipment has been installed and electrical construction has proceeded. During this time period significant short term testing of the Albright Generating Station cofiring facility was completed, and the 100-hour test was planned for early October. The testing demonstrated that cofiring at the Albright Generating Station could contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gas emissions. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.

K. Payette; D. Tillman

2001-10-01T23:59:59.000Z

448

Groundwater quality monitoring well installation for Waste Area Grouping at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

This report documents the drilling and installation of 18 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 11. WAG 11 (White Wing Scrap Yard) is located on the west end of East Fork Ridge between White Wing Road and the Oak Ridge Turnpike. The scrap yard is approximately 25 acres in size. The wells at WAG 11 were drilled and developed between January 1990 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 11 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 11. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents.

Mortimore, J.A.; Lee, T.A.

1994-09-01T23:59:59.000Z

449

Advanced Distributed Generation LLC | Open Energy Information  

Open Energy Info (EERE)

LLC LLC Jump to: navigation, search Name Advanced Distributed Generation LLC Address 200 West Scott Park Drive, MS # 410 Place Toledo, Ohio Zip 43607 Sector Solar Product Agriculture; Consulting; Installation; Maintenance and repair; Retail product sales and distribution Phone number 419-725-3401 Website http://www.advanced-dg.com Coordinates 41.6472294掳, -83.5975882掳 Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.6472294,"lon":-83.5975882,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

450

Wind turbine generator interaction with conventional diesel generators on Block Island, Rhode Island. Volume 1. Executive summary  

SciTech Connect

This report summarizes the primary results of a three-part study involving the effects of connecting a MOD-OA wind turbine generator to an isolated diesel power system. The subject utility is that owned and operated by the Block Island Power Company (BIPCO). The MOD-OA installation here was the third of four experimental nominal 200 kW wind turbines connected to various utilities under the Federal Wind Energy Program. The BIPCO installation was characterized by the highest wind energy penetration levels of four sites and, as such, was adjudged the best candidate for conducting the data acquisition and analysis effort that is the subject of this study. The three-phases of the study analysis address: (1) fuel displacement, (2) dynamic interaction, and (3) three modes of reactive power control. These analyses all have as their basis the results of the data acquisition program conducted during 1982 from February into April on Block Island, Rhode Island.

Wilreker, V.F.; Stiller, P.H.; Scott, G.W.; Kruse, V.J.; Smith, R.F.

1984-02-01T23:59:59.000Z

451

Effect of gaps on the performance of the vertically installed wet thermal insulator  

SciTech Connect

In SMART, the main flow path of the reactor coolant and the pressurizer partially share common walls in the reactor coolant system. To reduce this heat transfer, the wet thermal insulator (WTI) is installed on the inner wall of the pressurizer. The WTI is constituted of stacked thin stainless steel plates. The water layer width between the plates is chosen to suppress natural convection in each layer. The plates of the WTI require clearance for thermal expansion. When the WTI is installed on a vertical wall, this clearance might cause gaps at the top and bottom at the operating condition. In this study, we focused on the effect of gaps at the both ends on the WTI performance. A numerical simulation was conducted for an 8-layer WTI with gaps at the both ends. To compare with this, a simulation of a WTI without a gap, which is an ideal case, was also conducted. The simulation was conducted in a 2-dimensional manner by a commercial computational fluid dynamics code, FLUENT. The simulations showed that the WTI thermal performance was substantially decreased by a flow that circulated through the top and bottom gaps and water layers at the sides of the WTI. This circulation caused a high temperature difference between the wall and the circulating flow. To find a way to prevent this performance deterioration of the WTI we simulated several cases with the smaller gap heights. However, the flow circulation and the higher heat transfer rate were still observed even at a case with the smallest gap, which seems to be hardly achievable in a real installation. Another way of reducing the flow circulation was suggested and also simulated in this study. (authors)

Kim, S. H.; Kim, Y. I.; Park, C. T.; Choi, S.; Yoon, J. [Korea Atomic Energy Research Inst., Daeduk-daero 989-111, Yuseong-Gu, Daejeon, 305-353 (Korea, Republic of)

2012-07-01T23:59:59.000Z

452

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

Wind Powering America (EERE)

  Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 006 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Increased by 7% in 006 . . . . . . . . . . . . . . . .4 The United States Leads the World in Annual Capacity Growth . . . . . . . .4 Texas, Washington, and California Lead the U.S. in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with Siemens Gaining Market Share . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Average Turbine Size Continues to Increase . . . . . . . . . . . . . . . . . . . . . . .7 Developer Consolidation Accelerates . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Innovation and Competition in Non-Utility Wind Financing Persists . . . .9

453

Expert Meeting Report: Achieving the Best Installed Performance from High-Efficiency Residential Gas Furnaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieving the Best Installed Performance from High- Efficiency Residential Gas Furnaces Larry Brand Partnership for Advanced Residential Retrofit (PARR) March 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade

454

Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern  

E-Print Network (OSTI)

After having served for the surface tests of the Compact Muon Solenoid (CMS) magnet, the cold box and ancillaries of the CMS helium refrigerator have been dismantled, moved and re-installed in the USC55 cavern in 2007. The full re-commissioning in the cavern has been followed by several tests of the refrigerator to confirm its nominal performance before it was used for the magnet and detector tests in 2008. During these tests the safety modes of the refrigeration system have been tested and improved. After a nine-year project both, the magnet and the refrigeration system are now ready for the CMS operation.

Dupont, T; Perinic, G; 10.1063/1.3422381

2010-01-01T23:59:59.000Z

455

Hospital remedies architect's lighting overdesign for $22k: installs current limiters  

SciTech Connect

St. Luke's Hospital in Racine, Wisconsin is spending $22,000 to install current limiters in the fluorescent lamps of a new wing after finding that the architectural firm overdesigned the lighting fixtures so much that the hospital's lighting expenses were 50% higher than necessary. The hospital expects an 8-month payback on the current limiters. The hospital's corridor lighting reached 45-55 footcandles (fc), when only three fc are required for emergency lighting and 15 for corridor lighting. Representatives of the architectural firm argued that the design did not exceed state wattage requirements.

Ponczak, G.

1984-10-29T23:59:59.000Z

456

Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes  

SciTech Connect

This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

Chan, Wanyu Rengie; Singer, Brett C.

2014-04-03T23:59:59.000Z

457

Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States  

Energy.gov (U.S. Department of Energy (DOE))

For the United States to ensure that the substantial rollout of offshore wind energy projects envisioned by the DOE is carried out in an efficient and cost-effective manner, it is important to observe the current and emerging practices in the international offshore wind energy industry. In this manner, the United States can draw from the experience already gained around the world, combined with experience from the sizeable U.S. land-based wind industry, to develop a strong offshore wind sector. The work detailed in this report will support that learning curve by enabling optimization of the cost-effectiveness of installation, operation, and maintenance activities for offshore wind farms.

458

Handbook of experiences in the design and installation of solar heating and cooling systems  

SciTech Connect

A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

Ward, D.S.; Oberoi, H.S.

1980-07-01T23:59:59.000Z

459

Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3  

SciTech Connect

This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

Meichle, R.H.

1994-11-08T23:59:59.000Z

460

Installation restoration program. Phase 1. Records search, Ellsworth AFB, South Dakota. Final report  

SciTech Connect

This report identified and evaluated several potentially hazardous waste-disposal sites at Ellsworth AFB. Records of past waste handling and disposal practices were reviewed. Interviews with past and present installation employees were conducted to develop a history of waste disposal practices. The environmental setting was evaluated including soils, geology, past ground water and surface water. A fire protection training area, six landfills, an underground tank leak (Auto Hobby Shop). Three past coolant spills, an EOD Pramitol spill, three fuel leaks/spills and a low-level radioactive burial site were found to have sufficient potential to create environmental contamination and follow-on investigations (Phase II) were recommended and outlined.

Schroeder, E.J.; Menard, J.G.; Absalon, J.R.; McAuliffe, J.P.

1985-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Steam generator support system  

DOE Patents (OSTI)

A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances.

Moldenhauer, James E. (Simi Valley, CA)

1987-01-01T23:59:59.000Z

462

Steam generator support system  

DOE Patents (OSTI)

A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source is disclosed. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances. 4 figs.

Moldenhauer, J.E.

1987-08-25T23:59:59.000Z

463

generation | OpenEI  

Open Energy Info (EERE)

generation generation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 16, and contains only the reference case. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords AEO generation renewable energy renewable energy generating capacity Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generating Capacity and Generation- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed Comment Temporal and Spatial Coverage Frequency Annually Time Period 2008-2035 License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata

464

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network (OSTI)

Investigation of Photovoltaic Cost Trends in California,Investigation of Photovoltaic Cost Trends in California.photovoltaic (PV) systems have grown in number, so too has the desire to track the installed cost

Barbose, Galen L

2010-01-01T23:59:59.000Z

465

Songs in the language of information : using personal computers to create sounds and graphics for a large scale installation  

E-Print Network (OSTI)

Personal computers are easy to program, inexpensive and portable. With two Commodore 64 computers, I created an artistic installation entitled "Songs in the Language of Information". It was composed of elements reflecting ...

Geitz, Sarah

1985-01-01T23:59:59.000Z

466

Trust, privacy, and legal protection in the use of software with surreptitiously installed operations: An empirical evaluation  

Science Journals Connector (OSTI)

The class of software which is 搒urreptitiously installed on a user抯 computer and monitors a user抯 activity and reports back to a third party on that behavior is referred to as spyware (Stafford and Urbaczews...

Janice C. Sipior; Burke T. Ward

2008-03-01T23:59:59.000Z

467

NLO Partonic Event Generators  

E-Print Network (OSTI)

Merging the benefits of an NLO calculation with event generators is a topic of current interest. Among other things, it is advantageous to be able to generate unweighted events according to NLO matrix elements. I report on an algorithm which generates a sequence of unweighted momentum configurations, each configuration containing either n or n+1 four-vectors, such that for any infrared safe observable the average over these configurations coincides with the NLO calculation up to errors of a resolution variable.

Stefan Weinzierl

2002-05-10T23:59:59.000Z

468

Generation adequacy: Who decides?  

SciTech Connect

As part of a project for the Edison Electric Institute, the authors examined the commercial and reliability aspects of investments in new generation. This article reviews historical data and projections on new generating capacity, discusses the pros and cons of alternative ways to maintain adequacy, and quantifies the effects of mandating minimum planning-reserve margins versus reliance on market prices to stimulate investments in new generation.

Hirst, E.; Hadley, S.

1999-10-01T23:59:59.000Z

469

Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio (Presentation)  

SciTech Connect

This presentation provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

Sinclair, K.; Oteri, F.

2011-05-01T23:59:59.000Z

470

Byers Auto Group: A Case Study Into The Economics, Zoning, and Overall Process of Installing Small Wind Turbines at Two Automotive Dealerships in Ohio  

SciTech Connect

This paper provides the talking points about a case study on the installation of a $600,000 small wind project, the installation process, estimated annual energy production and percentage of energy needs met by the turbines.

Oteri, F.; Sinclair, K.

2011-11-01T23:59:59.000Z

471

Tracking the Sun V: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011  

E-Print Network (OSTI)

Building-Integrated Photovoltaics (BIPV) in the ResidentialV: The Installed Price of Photovoltaics in the United StatesV: The Installed Price of Photovoltaics in the United States

Barbose, Galen

2014-01-01T23:59:59.000Z

472

Annual Report Generator.  

E-Print Network (OSTI)

?? This report analyzes the needs to build an annual report generator which has the properties of Modularity, Simplicity in use and Maintainability based on (more)

Lin, Yingwei

2006-01-01T23:59:59.000Z

473

Hydrogen Generator Appliance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

lAbOrAtOry NG Workshop summary report - appeNDIX J slide presentation: hydrogen Generator appliance Gus Block, Nuvera Fuel Cells...

474

Biomass: Biogas Generator  

NLE Websites -- All DOE Office Websites (Extended Search)

BIOGAS GENERATOR Curriculum: Biomass Power (organic chemistry, chemicalcarbon cycles, plants, energy resourcestransformations) Grade Level: Middle School (6-8) Small groups (3 to...

475

Isolated trigger pulse generator  

DOE Patents (OSTI)

A trigger pulse generation system capable of delivering a multiplicity of isolated 100 kV trigger pulses with picosecond simultaneity. 2 figs.

Aaland, K.

1980-02-19T23:59:59.000Z

476

Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

scheduling, dispatching, and accounting for capacity and energy generated at the 22 hydroelectric projects in the agencys 11-state marketing area. Southeastern has Certified...

477

EIA - Electricity Generating Capacity  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Generating Capacity Release Date: January 3, 2013 | Next Release: August 2013 Year Existing Units by Energy Source Unit Additions Unit Retirements 2011 XLS XLS XLS 2010...

478

SNE TRAFIC GENERATOR  

Energy Science and Technology Software Center (OSTI)

003027MLTPL00 Network Traffic Generator for Low-rate Small Network Equipment Software http://eln.lbl.gov/sne_traffic_gen.html

479

NETL: News Release - Newly Installed Alaska North Slope Well Will Test  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2011 18, 2011 Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies Project Goals Include Injecting and Storing CO2 While Producing Methane Gas from Hydrate Washington, D.C. - A fully instrumented well that will test innovative technologies for producing methane gas from hydrate deposits has been safely installed on the North Slope of Alaska. As a result, the "I摹nik Sikumi" (I帽upiaq for "fire in the ice") gas hydrate field trial well will be available for field experiments as early as winter 2011-12. The well, the result of a partnership between ConocoPhillips and the Office of Fossil Energy's (FE) National Energy Technology Laboratory, will test a technology that involves injecting carbon dioxide (CO2) into sandstone reservoirs containing methane hydrate. Laboratory studies indicate that the CO2 molecules will replace the methane molecules within the solid hydrate lattice, resulting in the simultaneous sequestration of CO2 in a solid hydrate structure and production of methane gas.

480

INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER  

SciTech Connect

Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.

Smith, M.; Iverson, D.

2010-12-08T23:59:59.000Z

Note: This page contains sample records for the topic "installed liquids-fired generating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Global search tool for the Advanced Photon Source Integrated Relational Model of Installed Systems (IRMIS) database.  

SciTech Connect

The Integrated Relational Model of Installed Systems (IRMIS) is a relational database tool that has been implemented at the Advanced Photon Source to maintain an updated account of approximately 600 control system software applications, 400,000 process variables, and 30,000 control system hardware components. To effectively display this large amount of control system information to operators and engineers, IRMIS was initially built with nine Web-based viewers: Applications Organizing Index, IOC, PLC, Component Type, Installed Components, Network, Controls Spares, Process Variables, and Cables. However, since each viewer is designed to provide details from only one major category of the control system, the necessity for a one-stop global search tool for the entire database became apparent. The user requirements for extremely fast database search time and ease of navigation through search results led to the choice of Asynchronous JavaScript and XML (AJAX) technology in the implementation of the IRMIS global search tool. Unique features of the global search tool include a two-tier level of displayed search results, and a database data integrity validation and reporting mechanism.

Quock, D. E. R.; Cianciarulo, M. B.; APS Engineering Support Division; Purdue Univ.

2007-01-01T23:59:59.000Z

482

Estimates of energy consumption by building type and end use at U.S. Army installations  

SciTech Connect

This report discusses the use of LBNL`s End-use Disaggregation Alogrithm (EDA) to 12 US Army installations nationwide in order to obtain annual estimates of electricity use for all major building types and end uses. The building types include barrack, dining hall, gymnasium, administration, vehicle maintenance, hospital, residential, warehouse, and misc. Up to 8 electric end uses for each type were considered: space cooling, ventilation (air handling units, fans, chilled and hot water pumps), cooking, misc./plugs, refrigeration, exterior and interior lighting, and process loads. Through building simulations, we also obtained estimates of natural gas space heating energy use. Average electricity use for these 12 installations and Fort Hood are: HVAC, misc., and indoor lighting end uses consumed the most electricity (28, 27, and 26% of total[3.8, 3.5, and 3.3 kWh/ft{sup 2}]). Refrigeration, street lighting, exterior lighting, and cooking consumed 7, 7, 3, and 2% of total (0.9, 0.9, 0.4, and 0.3 kWh/ft{sup 2})

Konopacki, S.J.; Akbari, H.

1996-08-01T23:59:59.000Z

483

Well completion report on installation of horizontal wells for in-situ remediation tests  

SciTech Connect

A project to drill and install two horizontal vapor extraction/air-injection wells at the Savannah River Site (SRS), Aiken, South Carolina, was performed in September and October of 1988. This study was performed to test the feasibility of horizontal drilling technologies in unconsolidated sediments and to evaluate the effectiveness of in-situ air stripping of volatile organics from the ground water and unsaturated soils. A tremendous amount of knowledge was obtained during the drilling and installation of the two test wells. Factors of importance to be considered during design of another horizontal well drilling program follow. (1) Trips in and out of the borehole should be minimized to maintain hole stability. No reaming to enlarge the hole should be attempted. (2) Drilling fluid performance should be maximized by utilizing a low solids, low weight, moderate viscosity, high lubricity fluid. Interruption of drilling fluid circulation should be minimized. (3) Well materials should possess adequate flexibility to negotiate the curve. A flexible guide should be attached to the front of the well screen to guide the screen downhole. (4) Sands containing a minor amount of clay are recommended for completion targets, as better drilling control in the laterals was obtained in these sections.

Kaback, D.S.; Looney, B.B.; Corey, J.C.; Wright, L.M.

1989-08-01T23:59:59.000Z

484

Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), 2004  

Energy.gov (U.S. Department of Energy (DOE))

Development of a database, in Excel format, listing CHP installations incorporating thermal energy storage or turbine inlet cooling.

485

FISCAL YEAR 1997 WELL INSTALLATION, PLUGGING AND ABANDONMENT, AND REDEVELOPMENT SUMMARY REPORT Y-12 PLANT, OAK RIDGE, TENNESSEE  

SciTech Connect

This report summarizes the well installation, plugging and abandonment and redevelopment activities conducted during the federal fiscal year (FY) 1997 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. No new groundwater monitoring wells were installed during FY 1997. However, 13 temporary piezometers were installed around the Upper East Fork Poplar Creek (UEFPC) in the Y-12 Plant. An additional 36 temporary piezometers, also reported in this document, were installed in FY 1996 and, subsequently, assigned GW-series identification. A total of 21 monitoring wells at the Y-12 Plant were decommissioned in FY 1997. Three existing monitoring wells underwent redevelopment during FY 1997. All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures in the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988), the {ital Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document} (EPA 19?6), and {ital Guidelines for Installation of Monitoring Wells at the Y-12 Plant} (Geraghty & Miller 1985). All wells were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the U.S. Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991). Health and safety monitoring and field screening of drilling returns and development waters were conducted in accordance with approved Lockheed Martin Energy Systems, Inc. (Energy Systems) guidelines.

SCIENCE APPLICATIONS INTERNATIONAL CORPORATION

1997-09-01T23:59:59.000Z

486

Electricity Generation | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Electricity Generation Electricity Generation Photo of geothermal power plant. A geothermal resource requires fluid, heat and permeability in order to generate electricity:...

487

Next-generation transcriptome assembly  

E-Print Network (OSTI)

technologies - the next generation. Nat Rev Genet 11, 31-algorithms for next-generation sequencing data. Genomicsassembly from next- generation sequencing data. Genome Res

Martin, Jeffrey A.

2012-01-01T23:59:59.000Z

488

Installation of the Monitoring Site at the Los Alamos Canyon Low-Head Weir  

SciTech Connect

The Cerro Grande fire of 2000 had an enormously adverse impact on and around Los Alamos National Laboratory (LANL). Immediately there were concerns about the potential for enhanced runoff/offsite transport of contaminant-laden sediments because of watershed damage. In response to this concern, the U.S. Army Corps of Engineers installed a low-head weir in Los Alamos Canyon near the White Rock ''Y.'' However, the occurrence of fractured basalt at the surface and ponding of runoff behind the weir enhance the possibility of downward migration of contaminants. Therefore, three boreholes were drilled on the south bank of the channel by LANL to provide a means of monitoring the impact of the Cerro Grande fire and of the weir on water quality beneath the canyon. The boreholes and associated instrumentation are referred to as the Los Alamos Weir Site (LAWS). The three boreholes include a vertical hole and two angled holes (one at approximately 45{sup o} and one at approximately 30{sup o}). Since the basalt is highly fractured, the holes would not stay open. Plans called for inserting flexible liners into all holes. However, using liners in such unstable ground was problematic and, in the angled holes, required deployment through scalloped or perforated polyvinyl chloride (PVC) shield. The vertical hole (LAWS-01), drilled to a total depth of 281.5 ft below ground surface (bgs), was completed as a 278-ft deep monitoring well with four screens: one targeting shallow perched water encountered at 80 ft, two in what may correspond to the upper perched zone at regional groundwater characterization well R-9i (1/4 mi. to the west), and one in what may correspond to the lower perched zone at R-9i. A Water FLUTe{trademark} system deployed in the well isolates the screened intervals; associated transducers and sampling ports permit monitoring head and water quality in the screened intervals. The second hole (LAWS-02), drilled at an angle of 43{sup o} from horizontal, is 156 ft long and bottoms at a depth of 106 ft bgs. The shallow perched water seen at LAWS-01 (at 80 ft) was not encountered. A scalloped PVC shield was installed to keep the hole open while permitting flexible liners to contact the borehole wall. It was initially instrumented with a color-reactive liner to locate water-producing fractures. That was later replaced by an absorbent liner to collect water from the vadose zone. The third hole (LAWS-03), drilled at an angle of 34{sup o} from horizontal, initially had a length of 136 ft and bottomed at a depth of 76 ft bgs. However, the PVC shield rotated during installation such that scallops were at the top and rock debris repeatedly fell in, preventing liner insertion. While pulling the scalloped PVC to replace it with a perforated PVC shield that did not require orientation, the scalloped PVC broke and only 85 ft was recovered. The hole was blocked at that position and could not be drilled out with the equipment available. Thus, LAWS-03 was completed at a length of 85 ft and a depth of 40 ft bgs. An absorbent liner was installed at the outset in preparation for the 2002 summer monsoon season. The entire monitoring site is enclosed inside a locked, 8-ft-high chainlink fence for security. The liners used in the angled boreholes carry electrical wire pairs to detect soil-moisture changes. Surface-water data are provided by stream gages above and below the weir site. Depth of ponding behind the weir is provided by a gage installed just behind the structure.

W.J.Stone; D.L.Newell

2002-08-01T23:59:59.000Z

489

Fostering a New Generation of Geothermal Workers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fostering a New Generation of Geothermal Workers Fostering a New Generation of Geothermal Workers Fostering a New Generation of Geothermal Workers October 5, 2010 - 4:31pm Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Editor's Note: The Registration Deadline has been extended to November 12th. If there's one thing that absolutely must be in place to build a robust clean energy economy, it's a robust and well-trained clean energy workforce. Think about it - we're doing something here that we've never really done before, at least not to this scale. It's one thing to install solar panels on top of large building complexes and in huge fields - but how about every home in America? And if we're really going to use electric vehicles to the scale that David Sandalow talked about yesterday,

490

NREL: Energy Analysis - Distributed Generation Energy Technology Capital  

NLE Websites -- All DOE Office Websites (Extended Search)

Capital Costs Capital Costs Transparent Cost Database Button The following charts indicate recent capital cost estimates for distributed generation (DG) renewable energy technologies. The estimates are shown in dollars per installed kilowatt of generating capacity or thermal energy capacity for thermal technologies. The charts provide a compilation of available national-level cost data from a variety of sources. Costs in your specific location will vary. The red horizontal lines represent the first standard deviation of the mean. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) sponsored the distributed generation data used within these charts. If you are seeking utility-scale technology capital cost estimates, please visit the Transparent Cost Database website for NREL's information

491

Distributed Generation Study/SUNY Buffalo | Open Energy Information  

Open Energy Info (EERE)

Distributed Generation Study/SUNY Buffalo Distributed Generation Study/SUNY Buffalo < Distributed Generation Study Jump to: navigation, search Study Location Buffalo, New York Site Description Institutional-School/University Study Type Long-term Monitoring Technology Microturbine Prime Mover Capstone C60 Heat Recovery Systems Built-in Fuel Natural Gas System Installer Gerster Trane System Enclosure Outdoor System Application Combined Heat and Power Number of Prime Movers 2 Stand-alone Capability None Power Rating 120 kW0.12 MW 120,000 W 120,000,000 mW 1.2e-4 GW 1.2e-7 TW Nominal Voltage (V) 480 Heat Recovery Rating (BTU/hr) 600000 Cooling Capacity (Refrig/Tons) Origin of Controller Manufacturer-Integrated Component Integration Factory Integrated Start Date 2002/12/11 Monitoring Termination Date 2004/08/11

492

La Plata Electric Association - Renewable Generation Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

La Plata Electric Association - Renewable Generation Rebate Program La Plata Electric Association - Renewable Generation Rebate Program La Plata Electric Association - Renewable Generation Rebate Program < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Home Weatherization Water Wind Maximum Rebate PV 10 kW or smaller: $4,000 Program Info State Colorado Program Type Utility Rebate Program Rebate Amount PV 10 kW-DC or smaller: Upfront incentive of $0.40 per watt DC PV greater than 10 kW-DC: Performance-based incentive of $44.91/MWh ($0.04491/kWh) paid every 6 months for 10 years Provider La Plata Electric Association La Plata Electric Association (LPEA) offers a one-time rebate, not to exceed the cost of the system, to residential and small commercial customers who install a photovoltaic (PV), wind or hydropower facility. To

493

Spectrally tailored supercontinuum generation from single-mode-fiber amplifiers  

SciTech Connect

Spectral filtering of an all-normal-dispersion Yb-doped fiber laser was demonstrated effective for broadband supercontinuum generation in the picosecond time region. The picosecond pump pulses were tailored in spectrum with 1 nm band-pass filter installed between two single-mode fiber amplifiers. By tuning the spectral filter around 1028?nm, four-wave mixing was initiated in a photonic crystal fiber spliced with single-mode fiber, as manifested by the simultaneous generation of Stokes wave at 1076?nm and anti-Stokes wave at 984?nm. Four-wave mixing took place in cascade with the influence of stimulated Raman scattering and eventually extended the output spectrum more than 900?nm of 10?dB bandwidth. This technique allows smooth octave supercontinuum generation by using simple single-mode fiber amplifiers rather than complicated multistage large-mode-area fiber amplifiers.

Hao, Qiang; Guo, Zhengru; Zhang, Qingshan [Shanghai Key Laboratory of Modern Optical System, Engineering Research Center of Optical Instrument and System (Ministry of Education), School of Optical-Electrical and Computer Engineering, University of Shanghai for Science and Technology, 516 Jungong Road, Shanghai 200093 (China); Liu, Yang; Li, Wenxue [State Key Laboratory of Precision Spectroscopy, East China Normal University, 3663 Zhongshan North Road, Shanghai 200062 (China); Zeng, Heping, E-mail: hpzeng@phy.ecnu.edu.cn [Shanghai Key Laboratory of Modern Optical System, Engineering Research Center of Optical Instrument and System (Ministry of Education), School of Optical-Electrical and Computer Engineering, University of Shanghai for Science and Technology, 516 Jungong Road, Shanghai 200093 (China); State Key Laboratory of Precision Spectroscopy, East China Normal University, 3663 Zhongshan North Road, Shanghai 200062 (China)

2014-05-19T23:59:59.000Z

494

Minimization of Transportation, Installation and Maintenance Operations Costs for Offshore Wind Turbines.  

E-Print Network (OSTI)

??Although it is a sustainable source and there is abundant potential for energy, cost of energy generated from offshore wind is still high compared to (more)

Faiz, Tasnim Ibn

2014-01-01T23:59:59.000Z

495

Nanowires for energy generation  

Science Journals Connector (OSTI)

As a result of their morphology, nanowires bring new properties and the promise of performance for a range of electronic devices. This review looks into the properties of nanowires and the multiple ways in which they have been exploited for energy generation, from photovoltaics to piezoelectric generators.

Pritesh Hiralal; Husnu Emrah Unalan; Gehan A

2012-01-01T23:59:59.000Z

496

features Utility Generator  

E-Print Network (OSTI)

#12;#12;#12;#12;features function utility Training Pool Utility Generator Per-frame function content utility classes utility classes utility Tree Decision Generator Module Utility Clustering Adaptive Content Classification Loop features content VO selection & Utility Selector content features Real

Chang, Shih-Fu

497

Event generator overview  

SciTech Connect

Due to their ability to provide detailed and quantitative predictions, the event generators have become an important part of studying relativistic heavy ion physics and of designing future experiments. In this talk, the author will briefly summarize recent progress in developing event generators for the relativistic heavy ion collisions.

Pang, Y.

1997-12-01T23:59:59.000Z

498

Improved solid aerosol generator  

DOE Patents (OSTI)

An improved solid aerosol generator used to produce a gas borne stream of dry, solid particles of predetermined size and concentration. The improved solid aerosol generator nebulizes a feed solution of known concentration with a flow of preheated gas and dries the resultant wet heated aerosol in a grounded, conical heating chamber, achieving high recovery and flow rates. 2 figs.

Prescott, D.S.; Schober, R.K.; Beller, J.

1988-07-19T23:59:59.000Z

499

Reactivity of Acid Generators  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactivity of Acid Generators for Chemically Amplified Resists with Reactivity of Acid Generators for Chemically Amplified Resists with Low-Energy Electrons Atsuro Nakano, Takahiro Kozawa, Seiichi Tagawa, Tomasz Szreder, James F. Wishart, Toshiyuki Kai and Tsutomu Shimokawa Jpn. J. Appl. Phys., 45, L197-L200 (2006). [Find paper at the Japanese Journal of Applied Physics] Abstract: In chemically amplified resists for ionizing radiations such as electron beams and extreme ultraviolet (EUV), low-energy electrons play an important role in the pattern formation processes. The reactivity of acid generators with low-energy electrons was evaluated using solvated electrons in tetrahydrofuran, which were generated by a pulsed electron beam. The rate constants of acid generators with the solvated electrons ranged from 0.6 to 1.9 x 1011 M-1s-1

500

A First-Generation Prototype Dynamic Residential Window  

NLE Websites -- All DOE Office Websites (Extended Search)

A First-Generation Prototype Dynamic Residential Window A First-Generation Prototype Dynamic Residential Window Title A First-Generation Prototype Dynamic Residential Window Publication Type Report LBNL Report Number LBNL-56075 Year of Publication 2004 Authors Kohler, Christian, Howdy Goudey, and Dariush K. Arasteh Call Number LBNL-56075 Abstract We present the concept for a smart highly efficient dynamic window that maximizes solar heat gain during the heating season and minimizes solar heat gain during the cooling season in residential buildings. We describe a prototype dynamic window that relies on an internal shade, which deploys automatically in response to solar radiation and temperature. This prototype was built at Lawrence Berkeley National Laboratory from commercially available off-the-shelf components. It is a stand-alone, standard-size product, so it can be easily installed in place of standard window products. Our design shows promise for near-term commercialization. Improving thermal performance of this prototype by incorporating commercially available highly efficient glazing technologies could result in the first window that could be suitable for use in zero-energy homes. The units predictable deployment of shading could help capture energy savings that are not possible with manual shading. Installation of dynamically shaded windows in the field will allow researchers to better quantify the energy effects of shades, which could lead to increased efficiency in the sizing of heating, ventilation, and air conditioning equipment for residences.