Estimating SCR installation costs  

SciTech Connect (OSTI)

The EUCG surveyed 72 separate US installations of selective catalytic reduction (SCR) systems at coal-fired units totalling 41 GW of capacity to identify the systems' major cost drivers. The results, summarized in this article, provide excellent first-order estimates and guidance for utilities considering installing the downstream emissions-control technology. 4 figs., 1 tab.

Marano, M.; Sharp, G. [American Electric Power (United States)

2006-01-15T23:59:59.000Z

2

Factors Affecting PMU Installation Costs (October 2014)  

Broader source: Energy.gov [DOE]

The Department of Energy investigated the major cost factors that affected PMU installation costs for the synchrophasor projects funded through the Recovery Act Smart Grid Programs. The data was compiled through interviews with the nine projects that deployed production grade synchrophasor systems.

3

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

Barbose, Galen

2011-01-01T23:59:59.000Z

4

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Wiser, Ryan

2009-01-01T23:59:59.000Z

5

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Barbose, Galen

2011-01-01T23:59:59.000Z

6

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Barbose, Galen L

2010-01-01T23:59:59.000Z

7

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

Investigation of Photovoltaic Cost Trends in California.photovoltaic (PV) systems has increased, so too has the desire to track the installed costPhotovoltaic Power Systems. Figure 13. Comparison of Average Installed Costs (

Barbose, Galen

2011-01-01T23:59:59.000Z

8

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Title Tracking the Sun III The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Barbose, Galen L., Naïm Darghouth, and Ryan H. Wiser Pagination 54 Date Published 12/2010 Publisher LBNL City Berkeley Keywords distributed energy resources (der), electricity markets and policy group, energy analysis and environmental impacts department, energy markets, photovoltaics Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost1 of grid-connected PV systems in the United States from 1998 through 2009 (updating two previous reports with data through 2007 and 2008, respectively), and providing preliminary cost trends for systems installed in 2010. The analysis is based on installed cost data for approximately 78,000 residential and non-residential PV systems, totaling 874 megawatts (MW) and representing 70% of all grid-connected PV capacity installed in the United States through 2009.

9

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sun: The Installed Cost of Photovoltaics in the U.S. from Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Title Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, and Carla Peterman Pagination 42 Date Published 02/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As installations of grid-connected solar photovoltaic (PV) systems have grown, so too has the desire to track the installed cost of these systems over time, by system characteristics, by system location, and by component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2007. The report is based on an analysis of installed cost data from nearly 37,000 residential and non-residential PV systems, totaling 363 MW of capacity, and representing 76% of all grid-connected PV capacity installed in the U.S. through 2007.

10

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Title Tracking the Sun II The Installed Cost of Photovoltaics in the U.S. from 1998-2008 Publication Type Report Refereed Designation Unknown Year of Publication 2009 Authors Wiser, Ryan H., Galen L. Barbose, Carla Peterman, and Naïm Darghouth Pagination 150 Date Published 10/2009 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, photovoltaics, power system economics, renewable energy Abstract As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the installed cost of these systems over time and by location, customer type, system characteristics, and component. This report helps to fill this need by summarizing trends in the installed cost of grid-connected PV systems in the United States from 1998 through 2008 (updating a previous report with data through 2007). The analysis is based on installed cost data from more than 52,000 residential and non-residential PV systems, totaling 566 MW and representing 71% of all grid-connected PV capacity installed in the U.S. through 2008.

11

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

Annual Report on U.S. Wind Power Installation, Cost, and3 U.S. Wind Power Capacity Increased by 27% inAre Significant. . . . . . . 9 Wind Power Prices Are Up in

2008-01-01T23:59:59.000Z

12

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

10-100 kW >100 kW Tracking the Sun: The Installed Cost ofout over five years. Tracking the Sun: The Installed Cost ofU.S. from 1998-2007 Tracking the Sun: The Installed Cost of

Wiser, Ryan

2009-01-01T23:59:59.000Z

13

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

2008 BACK PAGE Tracking the Sun II: The Installed Cost of10-100 kW >100 kW Tracking the Sun II: The Installed Cost ofSystems MW Total Tracking the Sun II: The Installed Cost of

Barbose, Galen L

2010-01-01T23:59:59.000Z

14

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

E-Print Network [OSTI]

The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

Darghouth, Naim

2012-01-01T23:59:59.000Z

15

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

Investigation of Photovoltaic Cost Trends in California,Investigation of Photovoltaic Cost Trends in California.photovoltaic (PV) systems have grown in number, so too has the desire to track the installed cost

Barbose, Galen L

2010-01-01T23:59:59.000Z

16

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

Wind Powering America (EERE)

  Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 006 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Increased by 7% in 006 . . . . . . . . . . . . . . . .4 The United States Leads the World in Annual Capacity Growth . . . . . . . .4 Texas, Washington, and California Lead the U.S. in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with Siemens Gaining Market Share . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Average Turbine Size Continues to Increase . . . . . . . . . . . . . . . . . . . . . . .7 Developer Consolidation Accelerates . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Innovation and Competition in Non-Utility Wind Financing Persists . . . .9

17

Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in Integrated Gasification Combined Cycle Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Feasibility Studies to Improve Plant Feasibility Studies to Improve Plant Availability and Reduce Total Installed Cost in Integrated Gasification Combined Cycle Plants Background Gasification provides the means to turn coal and other carbonaceous solid, liquid and gaseous feedstocks as diverse as refinery residues, biomass, and black liquor into synthesis gas and valuable byproducts that can be used to produce low-emissions power, clean-burning fuels and a wide range of commercial products to support

18

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

Cost ($/MWh) Regulation Load Following Unit Commitment Gas31 Regulation and load-following impacts are generally found

2008-01-01T23:59:59.000Z

19

Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361  

SciTech Connect (OSTI)

The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike [Candesco - A Division of Kinectrics Inc, 26 Wellington E 3rd floor, Toronto, Ontario, M5E 1S2 (Canada)] [Candesco - A Division of Kinectrics Inc, 26 Wellington E 3rd floor, Toronto, Ontario, M5E 1S2 (Canada); Daniska, Vladimir [DECOM a.s., Sibirska 1, 917 01 Trnava (Slovakia)] [DECOM a.s., Sibirska 1, 917 01 Trnava (Slovakia)

2013-07-01T23:59:59.000Z

20

Minimization of Transportation, Installation and Maintenance Operations Costs for Offshore Wind Turbines.  

E-Print Network [OSTI]

??Although it is a sustainable source and there is abundant potential for energy, cost of energy generated from offshore wind is still high compared to (more)

Faiz, Tasnim Ibn

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

Results from Major Wind Integration Studies Completed 2003-a mini- mum) show that wind integration costs are generallyA number of additional wind integration analyses are planned

2008-01-01T23:59:59.000Z

22

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracking Tracking the Sun IV Tracking the Sun IV An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Photovoltaics in the United States from 1998 to 2010 Galen Barbose, Naïm Darghouth, Ryan Wiser, and Joachim Seel g y Lawrence Berkeley National Laboratory - Report Summary - p y September 2011 Environmental Energy Technologies Division * Energy Analysis Department Thanks to the U.S. DOE's Solar Energy Technologies Program and the Clean Energy States Alliance for supporting this work Project Overview Objective: Using project-level data, evaluate trends in the installed cost of grid-connected PV systems throughout the United States: g y g * Changes in total system installed cost and component-level costs over time * Variation in total installed cost by system size

23

Life cycle cost analysis of three renewed street lighting installations in Finland  

Science Journals Connector (OSTI)

The goal of the LCC study is to compare the costs occurring during ... to proof whether it is economic to update streetlights from HPM lamps and to assess the effect of LED technology development on LCCs in diffe...

Leena Thkm; Anne Ylinen

2012-02-01T23:59:59.000Z

24

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IV IV An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Galen Barbose Naïm Darghouth Ryan Wiser Joachim Seel September 2011 Tracking the Sun IV Contents An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010 Environmental Energy Technologies Division, Lawrence Berkeley National Laboratory Primary Authors: Galen Barbose, Naïm Darghouth, Ryan Wiser, and Joachim Seel Executive Summary ...................................................................................................... 1 1. Introduction .............................................................................................................. 5 2. Data Summary .......................................................................................................... 8

25

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

Investigation of Photovoltaic Cost Trends in California.Investigation of Photovoltaic Cost Trends in California,Investigation of Photovoltaic Cost Trends in California.

Wiser, Ryan

2009-01-01T23:59:59.000Z

26

Programming and Application of a Mobile Data Capture, Monitoring and Verification Instrument for Solar Thermal Installations in Southern Africa  

Science Journals Connector (OSTI)

Abstract South Africa was challenged to monitor dispersed \\{SWHs\\} installed by various independent players. GIZ South Africa cooperates with the Department of Energy and the South African Energy Development Institute in implementing a Geographic Information System. This was used jointly with SOLTRAIN to establish the Gauteng Solar Thermal Technology Flagship District.

Dieter Holm; Ulrich Averesch; Resmun Moonsamy

2014-01-01T23:59:59.000Z

27

Telecommunications Frontier Client Installation  

E-Print Network [OSTI]

Telecommunications Frontier Client Installation 1. Fax the completed form to 979.847.1111. 2 Signature Date Telecommunications Office Use Only Service Due Date: Installation Cost: Billed To: Print Form

28

Benchmarking Non-Hardware Balance of System (Soft) Costs for U.S. Photovoltaic Systems Using a Data-Driven Analysis from PV Installer Survey Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Non-Hardware Non-Hardware Balance of System (Soft) Costs for U.S. Photovoltaic Systems Using a Data-Driven Analysis from PV Installer Survey Results November 2012 Benchmarking Non-Hardware Balance of System (Soft) Costs for U.S. Photovoltaic Systems Using a Data-Driven Analysis from PV Installer Survey Results NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 LBNL's work was supported by the U.S. Department of Energy SunShot program under Contract No. DE-AC02-05CH11231 Technical Report DOE/GO-10212-3834 * November 2012 National Renewable Energy Laboratory 15013 Denver West Parkway

29

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

within the sample (e.g. , rack-mounted, building-integrated,building-integrated vs. rack-mounted, crystalline siliconClosed the Cost Gap with Rack-Mounted PV in New Construction

Barbose, Galen

2011-01-01T23:59:59.000Z

30

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

Incentive Programs (AEP, Entergy, Oncor, SWEPCO, TNMP) RERCIncentive TX Programs (AEP, Entergy, 10-100 kW Avg. CostIncentive Programs (AEP, Entergy, Oncor, SWEPCO, TNMP) VT

Barbose, Galen

2011-01-01T23:59:59.000Z

31

Advertising Installation Rates (rates include printing costs) Ads can be purchased at two-week or monthly intervals. Clients can request to have ads removed before the end of the scheduled display dates; however, clients  

E-Print Network [OSTI]

Advertising Installation Rates (rates include printing costs) Ads can be purchased at two are responsible for designing all advertisements. Approved ads must be 11 inches high and 17 inches wide. Allow Services will print, install and remove all ads. Submission Complete an advertising request form

Bennett, Gisele

32

Telecommunications Keyless Entry Hardware Install  

E-Print Network [OSTI]

Telecommunications Keyless Entry Hardware Install 1. Fax completed form to 979.847.1111. 2. If you Telecommunications Office Use Only Service Due Date: Installation Cost: Billed To: Print Form #12;

33

Factors Affecting PMU Installation Costs  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of conditions throughout the grid in real time. 1 These parameters represent the "heart-beat" and health of the power system. Voltage and current are parameters...

34

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems Using a Bottom-Up Approach and Installer Survey  

E-Print Network [OSTI]

Photovoltaic System Prices in the United States: Current Drivers and Costsoft costs for residential and commercial photovoltaic (of-System (Soft) Costs for U.S. Photovoltaic Systems Using a

Ardani, Kristen

2014-01-01T23:59:59.000Z

35

Optimization and life-cycle cost of health clinic PV system for a rural area in southern Iraq using HOMER software  

SciTech Connect (OSTI)

This paper addresses the need for electricity of rural areas in southern Iraq and proposes a photovoltaic (PV) solar system to power a health clinic in that region. The total daily health clinic load is 31.6 kW h and detailed loads are listed. The National Renewable Energy Laboratory (NREL) optimization computer model for distributed power, ''HOMER,'' is used to estimate the system size and its life-cycle cost. The analysis shows that the optimal system's initial cost, net present cost, and electricity cost is US$ 50,700, US$ 60,375, and US$ 0.238/kW h, respectively. These values for the PV system are compared with those of a generator alone used to supply the load. We found that the initial cost, net present cost of the generator system, and electricity cost are US$ 4500, US$ 352,303, and US$ 1.332/kW h, respectively. We conclude that using the PV system is justified on humanitarian, technical, and economic grounds. (author)

Al-Karaghouli, Ali; Kazmerski, L.L. [National Renewable Energy Laboratory, 1617 Cole Blvd., Golden, CO 80401 (United States)

2010-04-15T23:59:59.000Z

36

SunShot Prize: America's Most Affordable Rooftop Solar: A Competition To Spur Low-Cost Rooftop Solar Installations Across The Nation (Fact Sheet)  

SciTech Connect (OSTI)

The SunShot Prize encourages novel public-private partnerships, original business models, and innovative approaches to installing clean, renewable solar energy. The sustainable business strategies developed by participants will provide transferable lessons that can be applied nationwide to hasten America's transition to affordable clean energy in a post-subsidy market.

Not Available

2012-06-01T23:59:59.000Z

37

Install Removable Insulation on Valves and Fittings  

Broader source: Energy.gov [DOE]

This tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving steam systems using low-cost, proven practices and technologies.

38

Installation and Performance | Department of Energy  

Energy Savers [EERE]

Installation and Performance Photo of a group of men moving a rectangular solar panel. DOE partners with the solar industry to help reduce labor costs and maximize system...

39

Install an Automatic Blowdown-Control System  

Broader source: Energy.gov [DOE]

This steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

40

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems Using a Bottom-Up Approach and Installer Survey  

E-Print Network [OSTI]

Department of Energy). (2012). SunShot Vision Study. DOE/GO-prices and stimulating SunShot-level PV deployment in thetoward achieving the DOE SunShot Initiatives soft-cost-

Ardani, Kristen

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

SunShot Initiative: Installation and Performance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Installation and Performance to Installation and Performance to someone by E-mail Share SunShot Initiative: Installation and Performance on Facebook Tweet about SunShot Initiative: Installation and Performance on Twitter Bookmark SunShot Initiative: Installation and Performance on Google Bookmark SunShot Initiative: Installation and Performance on Delicious Rank SunShot Initiative: Installation and Performance on Digg Find More places to share SunShot Initiative: Installation and Performance on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Installation and Performance Photo of a group of men moving a rectangular solar panel. Energy Secretary Steven Chu watches members of the Solar Instructor

42

Cost and Pecuniary Economies in Cotton Production and Marketing: A Study of Texas Southern High Plains Cotton Producers.  

E-Print Network [OSTI]

or propane used do not necessarily increase for larger farms. The average price paid for gasoline was fairly constant across all farm sizes, as was propane, with the exception of the 1,601-2,560 acre farms. The higher 55-cent-per-gallon propane price.... AVERAGE ANNUAL VOLUME AND PRICE PAID FOR DIESEL, GASOLINE AND PROPANE BY FARM SIZE FOR COTTON FARMS OF THE TEXAS SOUTHERN HIGH PLAINS Diesel Gasoline Propane Average Farm Size Farm Size Volume Price Volume Pri ce Volume Price (acres) (acres) (1...

Smith, E.G.; Richardson, J.W.; Knutson, R.D.

1984-01-01T23:59:59.000Z

43

Developer Installed Treatment Plants  

E-Print Network [OSTI]

-installed treatment plants. These treatment plants are more commonly known as package wastewater treatment plants. 1

unknown authors

2008-01-01T23:59:59.000Z

44

Energy Conservation Installation Credit | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Conservation Installation Credit Energy Conservation Installation Credit Energy Conservation Installation Credit < Back Eligibility Multi-Family Residential Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate 500 per individual; up to 1,000 for a married couple filing jointly Program Info State Montana Program Type Personal Tax Credit Rebate Amount 25% of cost of capital investment Provider Montana Department of Revenue Individual taxpayers may claim a credit against their tax liability for up to 25% of the costs of investment for energy conservation purposes in a

45

Installation and Acceptance Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

1997-05-21T23:59:59.000Z

46

Solar installer's training program  

SciTech Connect (OSTI)

Instructions are given for the installation of solar domestic water heating systems, space heating systems, and pool heating systems. The basic procedures for installing any solar heating system are presented with reference to solar domestic hot water systems, and the space and pool systems are taught on that basis. (LEW)

Schmidt, W.J.; Philbin, J.

1981-01-01T23:59:59.000Z

47

Southern Solar Ltd | Open Energy Information  

Open Energy Info (EERE)

Ltd Place: Offham, East Sussex, United Kingdom Sector: Solar Product: Installer of PV and solar passive hot water systems in the UK. References: Southern Solar Ltd1 This article...

48

HVAC Installed Performance  

Broader source: Energy.gov (indexed) [DOE]

HVAC Installed Performance HVAC Installed Performance ESI, Tim Hanes Context * The building envelope has historically been the focus in residential homes. * The largest consumer of energy in residential homes is typically the HVAC system. * Testing the performance of the HVAC system has not been pursued to its full potential. Technical Approach * Currently very little performance testing is being done to the HVAC system. * The only way to know if a HVAC system is operating correctly is to measure the Btu/h. * This should be done at the equipment and at the the system. Recommended Guidance * Training of HVAC technicians, installers, and salespeople is a must. * If only the technician is trained than implementing the change will not happen. * Public awareness of proper installation and its

49

HVAC Installed Performance  

Broader source: Energy.gov [DOE]

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question HVAC proper installation energy savings: over-promising or under-delivering?"

50

Structural Code Considerations for Solar Rooftop Installations.  

SciTech Connect (OSTI)

Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

2014-12-01T23:59:59.000Z

51

STATEMENT OF CONSIDERATIONS REQUEST BY SOUTHERN COMPANY SERVICES, INC. FOR AN ADVANCE WAIVER  

Broader source: Energy.gov (indexed) [DOE]

SOUTHERN COMPANY SERVICES, INC. FOR AN ADVANCE WAIVER SOUTHERN COMPANY SERVICES, INC. FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN INVENTION RIGHTS UNDER DOE COOPERATIVE AGREEMENT NO. DE-NT000749, W(A)-09-024; CH-1489 The Petitioner, Southern Company Services (SCS) was awarded a cooperative agreement from the Department of Energy for the performance of work entitled, "Carbon Research Center at Power System Development Facility (PSDF)". The purpose of the cooperative agreement is to create and advance technologies under industrial conditions that will reduce the cost of advance coal-fueled power plants with CO 2 capture. The technology development will include the design, engineering, procurement, construction, installation, and operation of a flexible facility for the testing of processes for pre-combustion C02 capture, post-combustion C02 capture and oxy-

52

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

to hydrogen storage vessels and compressors. Feedstock CostHydrogen Production Equipment Purifier Storage System Compressor Dispenser Additional Equipment Installation Costshydrogen equipment costs. Meyers [2] provides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2006-01-01T23:59:59.000Z

53

Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide  

Broader source: Energy.gov (indexed) [DOE]

Two Million Smart Grid Meters Installed Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid technology is speeding the modernization of the nation's electrical grid, helping to reduce the amount of time needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As a result of an unprecedented investment from the Recovery Act, smart

54

Energy Department Completes Cool Roof Installation on DC Headquarters  

Broader source: Energy.gov (indexed) [DOE]

Completes Cool Roof Installation on DC Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding the cool roof as part of the roof replacement project and it will save taxpayers $2,000 every year in building energy costs. Cool roofs use lighter-colored roofing surfaces or special coatings to reflect more of the sun's heat, helping improve building efficiency, reduce cooling costs and offset carbon emissions. The cool roof and increased insulation at the facility were

55

Installation Guide 1. PREFACE .................................................................................................................................................... 3  

E-Print Network [OSTI]

AoC Installation Guide #12;Contents 1. PREFACE....................................................................................................................................................... 4 3.2 AOC............................................................................................................................................................. 4 3.3 AOC ADMIN

Natvig, Lasse

56

NV Energy (Southern Nevada)- Solar Hot Water Incentive Program  

Broader source: Energy.gov [DOE]

NV Energy is providing an incentive for its residential customers to install solar water heaters on their homes. As of July 26, 2013, NV Energy electric customers in Southern Nevada who own their...

57

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

58

Hawaii Marine Base Installs Solar Roofs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Marine Base Installs Solar Roofs Marine Base Installs Solar Roofs Hawaii Marine Base Installs Solar Roofs April 2, 2010 - 2:42pm Addthis Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar panels. The new roofs saves $20,000 a year in energy costs. Built on the end of the Mokapu Peninsula on Oahu's northeast coast, the Marine Corps Base Hawaii (MCBH) at Kaneohe Bay gets plenty of sunlight. But harnessing that sunlight to create renewable electricity was considered too expensive to be practical - until 2008. That's when MCBH took advantage of planned maintenance funding to help offset the high cost of installing photovoltaic panels on the base. As a military entity, MCBH can't directly take advantage of federal or state

59

HTAR Client Configuration and Installation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Configuration and Installation Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a machine which has more than one network interface, you may want to change some of these default settings. To help with this, an interactive Configure script is provided. To use it do $ ./Configure prior to installing. Configure will provide a description of the options

60

Would You Consider Installing a Cool Roof? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? Would You Consider Installing a Cool Roof? August 12, 2010 - 7:30am Addthis On Monday, Erin discussed cool roof technologies and how they can improve the comfort of buildings while reducing energy costs. Would you consider installing a cool roof? Why or why not? Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. Please comment with your answers, and also feel free to respond to other comments. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles Would You Consider Driving a Vehicle that Can Run on Biodiesel? Would You Consider Installing a Cool Roof? Tips: Energy-Efficient Roofs How Do You Save Water When Caring for Your Lawn?

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Assessing the costs of solar power plants for the Island of Roatn .  

E-Print Network [OSTI]

??This is an analysis assessing the installation costs of different solar power plant technologies and the current commercial availability for installation on the Island or (more)

Huwe, Ethan (Ethan L.)

2011-01-01T23:59:59.000Z

62

Low-Cost, Lightweight Solar Concentrator  

Broader source: Energy.gov (indexed) [DOE]

sunshot DOEGO-102012-3663 * September 2012 MOTIVATION Solar concentrators currently cost 150-250m 2 , which represents as much as half of the total installed cost for a...

63

Systems study of drilling for installation of geothermal heat pumps  

SciTech Connect (OSTI)

Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

1997-09-01T23:59:59.000Z

64

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... Administration and the government of East Pakistan. CONTENTS Chapter Page I. Introduction and Prelisd. nary Discussion II. Installation and Accounting Aspects of Standard Costs for Labor III, Recording~ Analysing and Reporting of Labor Vaxlances . 45 IV...

Khan, Mohammed Nurul Absar

2012-06-07T23:59:59.000Z

65

Magnet Girder Assembly and Installation  

ScienceCinema (OSTI)

It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

None

2013-07-17T23:59:59.000Z

66

Solar Installation Labor Market Analysis  

SciTech Connect (OSTI)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.; Jordan, P.; Carrese, J.

2011-12-01T23:59:59.000Z

67

Foldtrack Installation in C-110  

Broader source: Energy.gov [DOE]

Crews successfully installed a new and improved version of the Foldtrack into tank C-110, a single-shell tank with about 17,200 gallons of waste remaining.

68

High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance  

SciTech Connect (OSTI)

This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly total than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.

Wilson, L.E.; McGuire, D.R.

1984-05-01T23:59:59.000Z

69

Characterization of the Installed Costs of Prime Movers Using...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications CHP and Bioenergy Systems for Landfills and Wastewater Treatment Plants CHP and Bioenergy for Landfills and Wastewater Treatment Plants:...

70

The Southern California Conversion Technology Demonstration Project | Open  

Open Energy Info (EERE)

The Southern California Conversion Technology Demonstration Project The Southern California Conversion Technology Demonstration Project Jump to: navigation, search Tool Summary Name: The Southern California Conversion Technology Demonstration Project Agency/Company /Organization: The Southern California Conversion Technology Demonstration Project Sector: Energy, Land Focus Area: - Waste to Energy Phase: Create a Vision Resource Type: Publications User Interface: Website Website: www.socalconversion.org/resources.html Cost: Free The Southern California Conversion Technology Demonstration Project website is focused on a specific conversion technology demonstration project in L. A. County. Overview The Southern California Conversion Technology Demonstration Project website is focused on a specific conversion technology demonstration project in L.

71

Photovoltaics Design and Installation Manual | Open Energy Information  

Open Energy Info (EERE)

Photovoltaics Design and Installation Manual Photovoltaics Design and Installation Manual Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Photovoltaics Design and Installation Manual Agency/Company /Organization: Solar Energy International Sector: Energy Focus Area: Renewable Energy, Solar, - Solar PV Resource Type: Training materials User Interface: Other Website: www.solarenergy.org/bookstore/photovoltaics-design-installation-manual Cost: Paid Language: "English, Spanish; Castilian" is not in the list of possible values (Abkhazian, Achinese, Acoli, Adangme, Adyghe; Adygei, Afar, Afrihili, Afrikaans, Afro-Asiatic languages, Ainu, Akan, Akkadian, Albanian, Aleut, Algonquian languages, Altaic languages, Amharic, Angika, Apache languages, Arabic, Aragonese, Arapaho, Arawak, Armenian, Aromanian; Arumanian; Macedo-Romanian, Artificial languages, Assamese, Asturian; Bable; Leonese; Asturleonese, Athapascan languages, Australian languages, Austronesian languages, Avaric, Avestan, Awadhi, Aymara, Azerbaijani, Balinese, Baltic languages, Baluchi, Bambara, Bamileke languages, Banda languages, Bantu (Other), Basa, Bashkir, Basque, Batak languages, Beja; Bedawiyet, Belarusian, Bemba, Bengali, Berber languages, Bhojpuri, Bihari languages, Bikol, Bini; Edo, Bislama, Blin; Bilin, Blissymbols; Blissymbolics; Bliss, Bosnian, Braj, Breton, Buginese, Bulgarian, Buriat, Burmese, Caddo, Catalan; Valencian, Caucasian languages, Cebuano, Celtic languages, Central American Indian languages, Central Khmer, Chagatai, Chamic languages, Chamorro, Chechen, Cherokee, Cheyenne, Chibcha, Chichewa; Chewa; Nyanja, Chinese, Chinook jargon, Chipewyan; Dene Suline, Choctaw, Chuukese, Chuvash, Classical Newari; Old Newari; Classical Nepal Bhasa, Classical Syriac, Coptic, Cornish, Corsican, Cree, Creek, Creoles and pidgins , Crimean Tatar; Crimean Turkish, Croatian, Cushitic languages, Czech, Dakota, Danish, Dargwa, Delaware, Dinka, Divehi; Dhivehi; Maldivian, Dogri, Dogrib, Dravidian languages, Duala, Dutch; Flemish, Dyula, Dzongkha, Eastern Frisian, Efik, Egyptian (Ancient), Ekajuk, Elamite, English, Erzya, Esperanto, Estonian, Ewe, Ewondo, Fang, Fanti, Faroese, Fijian, Filipino; Pilipino, Finnish, Finno-Ugrian languages, Fon, French, Friulian, Fulah, Ga, Gaelic; Scottish Gaelic, Galibi Carib, Galician, Ganda, Gayo, Gbaya, Geez, Georgian, German, Germanic languages, Gilbertese, Gondi, Gorontalo, Gothic, Grebo, Greek, Modern, Guarani, Gujarati, Gwich'in, Haida, Haitian; Haitian Creole, Hausa, Hawaiian, Hebrew, Herero, Hiligaynon, Himachali languages; Western Pahari languages, Hindi, Hiri Motu, Hittite, Hmong; Mong, Hungarian, Hupa, Iban, Icelandic, Ido, Igbo, Ijo languages, Iloko, Inari Sami, Indic languages, Indo-European languages, Indonesian, Ingush, Interlingue; Occidental, Inuktitut, Inupiaq, Iranian languages, Irish, Iroquoian languages, Italian, Japanese, Javanese, Judeo-Arabic, Judeo-Persian, Kabardian, Kabyle, Kachin; Jingpho, Kalaallisut; Greenlandic, Kalmyk; Oirat, Kamba, Kannada, Kanuri, Kara-Kalpak, Karachay-Balkar, Karelian, Karen languages, Kashmiri, Kashubian, Kawi, Kazakh, Khasi, Khoisan languages, Khotanese; Sakan, Kikuyu; Gikuyu, Kimbundu, Kinyarwanda, Kirghiz; Kyrgyz, Klingon; tlhIngan-Hol, Komi, Kongo, Konkani, Korean, Kosraean, Kpelle, Kru languages, Kuanyama; Kwanyama, Kumyk, Kurdish, Kurukh, Kutenai, Ladino, Lahnda, Lamba, Land Dayak languages, Lao, Latin, Latvian, Lezghian, Limburgan; Limburger; Limburgish, Lingala, Lithuanian, Lojban, Lower Sorbian, Lozi, Luba-Katanga, Luba-Lulua, Luiseno, Lule Sami, Lunda, Luo (Kenya and Tanzania), Lushai, Luxembourgish; Letzeburgesch, Macedonian, Madurese, Magahi, Maithili, Makasar, Malagasy, Malay, Malayalam, Maltese, Manchu, Mandar, Mandingo, Manipuri, Manobo languages, Manx, Maori, Mapudungun; Mapuche, Marathi, Mari, Marshallese, Marwari, Masai, Mayan languages, Mende, Mi'kmaq; Micmac, Minangkabau, Mirandese, Mohawk, Moksha, Mon-Khmer languages, Mongo, Mongolian, Mossi, Multiple languages, Munda languages, N'Ko, Nahuatl languages, Nauru, Navajo; Navaho, Ndebele, North; North Ndebele, Ndebele, South; South Ndebele, Ndonga, Neapolitan, Nepal Bhasa; Newari, Nepali, Nias, Niger-Kordofanian languages, Nilo-Saharan languages, Niuean, North American Indian languages, Northern Frisian, Northern Sami, Norwegian, Nubian languages, Nyamwezi, Nyankole, Nyoro, Nzima, Occitan (post 1500); Provençal, Ojibwa, Oriya, Oromo, Osage, Ossetian; Ossetic, Otomian languages, Pahlavi, Palauan, Pali, Pampanga; Kapampangan, Pangasinan, Panjabi; Punjabi, Papiamento, Papuan languages, Pedi; Sepedi; Northern Sotho, Persian, Philippine languages, Phoenician, Pohnpeian, Polish, Portuguese, Prakrit languages, Pushto; Pashto, Quechua, Rajasthani, Rapanui, Rarotongan; Cook Islands Maori, Romance languages, Romanian; Moldavian; Moldovan, Romansh, Romany, Rundi, Russian, Salishan languages, Samaritan Aramaic, Sami languages, Samoan, Sandawe, Sango, Sanskrit, Santali, Sardinian, Sasak, Scots, Selkup, Semitic languages, Serbian, Serer, Shan, Shona, Sichuan Yi; Nuosu, Sicilian, Sidamo, Sign Languages, Siksika, Sindhi, Sinhala; Sinhalese, Sino-Tibetan languages, Siouan languages, Skolt Sami, Slave (Athapascan), Slavic languages, Slovak, Slovenian, Sogdian, Somali, Songhai languages, Soninke, Sorbian languages, Sotho, Southern, South American Indian (Other), Southern Altai, Southern Sami, Spanish; Castilian, Sranan Tongo, Sukuma, Sumerian, Sundanese, Susu, Swahili, Swati, Swedish, Swiss German; Alemannic; Alsatian, Syriac, Tagalog, Tahitian, Tai languages, Tajik, Tamashek, Tamil, Tatar, Telugu, Tereno, Tetum, Thai, Tibetan, Tigre, Tigrinya, Timne, Tiv, Tlingit, Tok Pisin, Tokelau, Tonga (Nyasa), Tonga (Tonga Islands), Tsimshian, Tsonga, Tswana, Tumbuka, Tupi languages, Turkish, Turkmen, Tuvalu, Tuvinian, Twi, Udmurt, Ugaritic, Uighur; Uyghur, Ukrainian, Umbundu, Uncoded languages, Undetermined, Upper Sorbian, Urdu, Uzbek, Vai, Venda, Vietnamese, Volapük, Votic, Wakashan languages, Walamo, Walloon, Waray, Washo, Welsh, Western Frisian, Wolof, Xhosa, Yakut, Yao, Yapese, Yiddish, Yoruba, Yupik languages, Zande languages, Zapotec, Zaza; Dimili; Dimli; Kirdki; Kirmanjki; Zazaki, Zenaga, Zhuang; Chuang, Zulu, Zuni) for this property.

72

Portland Advancing Green Image With Solar Installs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

73

Portland Advancing Green Image With Solar Installs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs Portland Advancing Green Image With Solar Installs February 22, 2010 - 12:10pm Addthis Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Laura Smoyer checks the net-metering device in her home, which now uses the sun for about 38 percent of its total energy use. | Department of Energy Photo | Joshua DeLung A quick Web search reveals that many sources consider Portland, Ore., to be one of the most green-minded cities in the United States. But large upfront costs have been a barrier for citizens looking to install solar power systems in the past. Now, a neighborhood solar initiative is helping communities organize to get solar discounts, meaning the city could become

74

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

75

Southern Power District - Residential Energy Efficiency Rebate Programs |  

Broader source: Energy.gov (indexed) [DOE]

Southern Power District - Residential Energy Efficiency Rebate Southern Power District - Residential Energy Efficiency Rebate Programs Southern Power District - Residential Energy Efficiency Rebate Programs < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Program Info State Nebraska Program Type Utility Rebate Program Rebate Amount Air Source Heat Pump: $100- $300 Geothermal Heat Pump: $400 Heat Pump (14 Seer minimum): $50 contractor rebate Attic Insulation: $0.15/sq. ft. HVAC Tune-Up: $30 Provider Southern Power District Southern Power District (SPD) offers rebates for the purchase and installation of efficient air source heat pumps, geothermal heat pumps, attic insulation, and HVAC tune-ups. Contractors who install 14 Seer or

76

installed capacity | OpenEI  

Open Energy Info (EERE)

installed capacity installed capacity Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments

77

Solar Installation Labor Market Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Installation Labor Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence Technical Report NREL/TP-6A20-49339 December 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence

78

Southern States Energy Compact (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Southern States Energy Compact (Multiple States) Southern States Energy Compact (Multiple States) Southern States Energy Compact (Multiple States) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Alabama Program Type Environmental Regulations Industry Recruitment/Support Provider Southern States Energy Board

79

NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov (indexed) [DOE]

NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate Program NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Appliances & Electronics Program Info State Nevada Program Type Utility Rebate Program Rebate Amount Refrigerator/freezer Recycling: $50 Air Conditioners: Up to $1000 Variable Speed Pool Pump: $200 '''Pool Pump and duct system rebates are temporarily suspended. Contact NV Energy for additional information on funding and program availability.''' NV Energy offers rebates for the installation of high efficiency A/C units, air source heat pumps, and pool pumps for residential customers in southern

80

Process Improvement at Army Installations  

E-Print Network [OSTI]

and pressed, and the cans are then placed on a conveyor belt. On this conveyor belt, which constitutes one of the production bottlenecks, a plastic cap and starter cap is installed in each can. The final steps for each can include installing the lid... each fuse. Load and Packout When the cans arrive at the Load and Packout building, they are manually removed and loaded on to both sides of a conveyor belt. The conveyor transports the cans to the tape and stencil machine where they are hand...

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Announces 27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces 27 Million to Reduce Costs of Solar Energy Projects,...

82

This Flash transmits the second installment under this project. Additional insta  

Broader source: Energy.gov (indexed) [DOE]

This Flash transmits the second installment under this project. Additional installments This Flash transmits the second installment under this project. Additional installments will follow as they are completed. There are two significant chapter revisions in this installment: 6.1, Competition; and 35.1, Scientific and Technical Information. There are also five primarily editorial chapter revisions in this installment, though the revisions include some updated materials as well: 17.2, Cost Participation; 17.4 Program Opportunity Notices; 17.5 Program Research and Development Notices; 22.1, Labor Standards for Construction; and 47.1, Transportation - Air Charter. Finally, three chapters have been removed. Chapter 45, Government Property, was removed because the coverage was obsolete. Chapter 70.1, Cost Participation, was removed because it was duplicative of 17.2 and inappropriate in

83

Commercial equipment cost database  

SciTech Connect (OSTI)

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

84

Sleeve installations speed pipeline defect repair  

SciTech Connect (OSTI)

Repairing defects in pipelines can be a major challenge for pipeline companies or contractors. To reduce cost and eliminate unscheduled shut downs, pipeline operating companies have adopted ``in-service`` repair methods to restore overall integrity of the pipeline without taking it out of service. Interprovincial Pipe Line Co. has undertaken an aggressive approach to this ``in-service`` repair method by using a developed sleeving system for repairing leaking and non-leaking defects. A structural reinforcement sleeve consists of two non-fillet welded collars (one on each side of the defect) and a full encirclement sleeve welded on top of these collars. The annular space between the pipe and sleeve is filled with a hardenable, non-shrinking epoxy. Three different pressure vessel sleeves can be used for repairing certain defects. They can be used in combination with the pre-stressed sleeve or for independent repairs. This paper reviews the performance and installation of these sleeves.

Friedrich, J.; Smith, J.

1995-12-01T23:59:59.000Z

85

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network [OSTI]

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS Refrigerant Charge Verification ­ Standard to refrigerant charge verification for compliance, a MECH-24 Certificate (instead of this MECH-25 Certificate) should be used to demonstrate compliance with the refrigerant charge verification requirement. TMAH

86

STATE OF CALIFORNIA INSTALLATION CERTIFICATE  

E-Print Network [OSTI]

ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-26-HERS Refrigerant Charge Verification ­ Alternate are specified in Reference Residential Appendix RA3.2. If refrigerant charge verification is requiredR-MECH-26-HERS Refrigerant Charge Verification ­ Alternate Measurement Procedure (Page 2 of 3) Site

87

Analysis of Energy, Environmental and Life Cycle Cost Reduction Potential  

Open Energy Info (EERE)

Environmental and Life Cycle Cost Reduction Potential Environmental and Life Cycle Cost Reduction Potential of Ground Source Heat Pump (GSHP) in Hot and Humid Climate Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Analysis of Energy, Environmental and Life Cycle Cost Reduction Potential of Ground Source Heat Pump (GSHP) in Hot and Humid Climate Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 2: Data Gathering and Analysis Project Description It has been widely recognized that the energy saving benefits of GSHP systems are best realized in the northern and central regions where heating needs are dominant or both heating and cooling loads are comparable. For hot and humid climate such as in the states of FL, LA, TX, southern AL, MS, GA, NC and SC, buildings have much larger cooling needs than heating needs. The Hybrid GSHP (HGSHP) systems therefore have been developed and installed in some locations of those states, which use additional heat sinks (such as cooling tower, domestic water heating systems) to reject excess heat. Despite the development of HGSHP the comprehensive analysis of their benefits and barriers for wide application has been limited and often yields non-conclusive results. In general, GSHP/HGSHP systems often have higher first costs than conventional systems making short-term economics unattractive. Addressing these technical and financial barriers call for additional evaluation of innovative utility programs, incentives and delivery approaches.

88

ADA Requirements for Workplace Charging Installation  

Broader source: Energy.gov [DOE]

Best Practices for installing PEV charging stations in compliance with the Americans with Disabilities Act.

89

ARM Southern Great Plains  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of clouds and aerosols, as well as their interactions, in climate and earth system models. More Information Southern Great Plains Site SGP Fact Sheet Visit the Southern...

90

Southern Research Institute Visit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

initiates collaboration between Southern Research Institute(SRI) and LSU CAMD hosted visitors from the Southern Research Institute in Birmingham, Alabama, and researchers from LSU...

91

Bad bag detection systems installed on the COHPAC (Compact Hybrid Particulate Collector) at Alabama Power, E.C. Gaston Unit No.3  

SciTech Connect (OSTI)

In December of 1996, Alabama Power Company, a subsidiary of the Southern Company, began operating a baghouse in conjunction with an existing hot-side precipitator on the cold side of the air heaters. The concept combining an electrostatic precipitator and a baghouse is termed a COHPAC (Compact Hybrid Particulate Collector), an EPRI technology. The baghouse is installed on Unit No.3 which is a 280 Mwe pulverized coal fired unit. Unit No.3 shares a common stack with Unit No.4, so the baghouse treats 50% of the total stack flow. The installation has resulted in the ability of both boilers to operate without costly boiler load reductions, which were quite common prior to the installation of the COHPAC system because of stack capacity. To date, after nearly three years of operation the COHPAC system has meet and exceeded all performance expectations. The installation has consistently provided low outlet emissions (<0.01 lb/Mbtu) and low opacity levels. To date, there have not been any known bag failures and maintenance has been minimal. Testing has shown bag life to be finite but no data has been compiled on this type system showing the operating window that would ensure optimal performance. Mullen Burst tests have shown degradation in bag strength, which indicates that this degradation at some point could result in premature failure of the bags. The COHPAC system installed at E.G., Gaston includes over 2,000 bags corresponding to roughly 57,500 ft{sup 2} of collecting surface area. Current methods of finding damaged bags are quite laborious and time intensive. A system to monitor performance and locating damaged bags will be presented. Associated performance and overall historical operating data on Unit No.3 will also be presented.

Berry, M.S.; Harrison, W.; Corina, B.; Wilson, R.; Harrington, J.

1999-07-01T23:59:59.000Z

92

Materials that Improve the Cost-Effectiveness of Air Barrier...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

tapes, while having a similar installed cost. Image: Dow Chemical Lead Performer: Oak Ridge National Laboratory - Oak Ridge, TN Partners: -- Dow Chemical - Midland, MI --...

93

Project Profile: High-Concentration, Low-Cost Parabolic Trough...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

aperture, while incorporating additional advancements that substantially lower installed solar field costs. For example, the reflective film surfaces are being upgraded to improve...

94

Extreme Balance of System Hardware Cost Reduction | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Research Corporation: Solar, Install, Mount, Production, Labor, Equipment (SIMPLE BOS) Solexel and Owens Corning: Development and Productization of High-Efficiency, Low-Cost...

95

DOE Solar Decathlon: University of Southern California  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southern California Southern California fluxHome solardecathlon.usc.edu For the U.S. Department of Energy Solar Decathlon 2013, the University of Southern California created fluxHome to celebrate the cultural and technological changes of the 21st century. The house combines a transformable envelope system with customizable components and smart-home technology to allow it to be configured in a multitude of lifestyle scenarios. By re-imagining the suburban tract home as a dynamic spatial environment, the house reflects the diverse lifestyles and ecologies known to Southern California. Design Philosophy In designing fluxHome, the University of Southern California team focused on developing a truly accessible model for energy-independent, low-cost housing that reflects the best qualities of indoor-outdoor living in

96

Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations  

SciTech Connect (OSTI)

This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

2010-03-09T23:59:59.000Z

97

NSTAR (Electric) - Small Business Direct Install Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program < Back Eligibility Commercial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Up to 70% of the total project cost Provider NSTAR The NSTAR Small Business Solutions Program offers incentives for business customers whose average monthly demand is 300 kW or less. The first step of the program is a free energy audit to identify potential energy saving

98

NREL: Technology Transfer - White Earth Nation Installs Turbines: A Wind  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

White Earth Nation Installs Turbines: A Wind Powering America Success Story White Earth Nation Installs Turbines: A Wind Powering America Success Story February 11, 2013 Almost 8 years after taking the initial steps to harness the wind, the White Earth Nation recently completed the installation of two small wind turbines that will help offset energy costs for Minnesota's largest and most populous Native American reservation. Mike Triplett, economic development planner with the White Earth Development Office, believes that the project represents a unique opportunity for tribal entities in the United States. He noted that tribes don't qualify for tax-based incentives. "And as for working with investors, we never found that to be a viable option," Triplett said. "So we've relied heavily on grants." Funded through nearly $1.8 million in congressional appropriations along

99

Install renewable energy systems | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Install renewable energy systems Install renewable energy systems Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach Install renewable energy systems

100

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

2009-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Evaporative Roof Cooling- A Simple Solution to Cut Cooling Costs  

E-Print Network [OSTI]

Since the Energy Crisis Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retro-fit installations show direct energy savings...

Abernethy, D.

102

Automated solar collector installation design  

DOE Patents [OSTI]

Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

2014-08-26T23:59:59.000Z

103

Cost Containment  

Science Journals Connector (OSTI)

Cost containment in health care involves awide ... , the growth rate of expenditure or certain costs of health care services. These measures include ... patient education, etc. The reasons for increased cost ...

2008-01-01T23:59:59.000Z

104

Heliostat cost-analysis tool  

SciTech Connect (OSTI)

Estimated production costs of solar energy systems serve as guides for future component development and as measures of the potential economic viability of the technologies. The analysis of heliostat costs is particularly important since the heliostat field is the largest cost component of a solar central receiver plant. A heliostat cost analysis tool (HELCAT) that processes manufacturing, transportation, and installation cost data has been developed to provide a consistent structure for cost analyses. HELCAT calculates a representative product price based on direct input data (e.g. direct materials, direct labor, capital requirements) and various economic, financial, and accounting assumptions. The characteristics of this tool and its initial application in the evaluation of second generation heliostat cost estimates are discussed. A set of nominal economic and financial parameters is also suggested.

Brandt, L.D.; Chang, R.E.

1981-10-01T23:59:59.000Z

105

ACS Installation During SM3B Introduction  

E-Print Network [OSTI]

ACS Installation During SM3B Introduction: · Installed during SM3B in March 2002 · Powerful 3rd · Over-voltage Protection kit installed · Optical Control Electronics connected · New Outer Blanket Layer, and coronagraph ­ Solar Blind Channel (SBC) : HST's most sensitive ultraviolet photon-counting detector 115-180 nm

Sirianni, Marco

106

ATLAS Installation Guide R. Clint Whaley  

E-Print Network [OSTI]

ATLAS Installation Guide R. Clint Whaley November 2, 2007 Abstract This note provides a brief overview of ATLAS, and describes how to install it. It includes extensive discussion of common configure to configure and build the ATLAS package, this note also describes how an installer can confirm

Whaley, R. Clint

107

Loess Hills and Southern Iowa Development and Conservation (Iowa) |  

Broader source: Energy.gov (indexed) [DOE]

Loess Hills and Southern Iowa Development and Conservation (Iowa) Loess Hills and Southern Iowa Development and Conservation (Iowa) Loess Hills and Southern Iowa Development and Conservation (Iowa) < Back Eligibility Agricultural Commercial Construction Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Iowa Program Type Environmental Regulations Provider Loess Hills Alliance The Loess Hills Development and Conservation Authority, the Loess Hills

108

FORSCOM installation characterization and ranking for water efficiency improvement  

SciTech Connect (OSTI)

On March 11, 1994, President Clinton signed Executive Order 12902-Energy Efficiency and Water Conservation at Federal Facilities. Section 302 of the Executive Order calls for energy and water prioritization surveys of federal facilities to be conducted. The surveys will be used to establish priorities for conducting comprehensive facility audits. In response to the requirements of the Executive Order, the U.S. Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) to initiate a broad study of the water savings potential at each of its major installations. This report provides an assessment of the water, sewer, energy (for hot water production and pumping), and associated cost savings potential at ten of the major FORSCOM installations. This assessment is meant to be a {open_quotes}first pass{close_quotes} estimate of the water savings potential, to assist FORSCOM in prioritizing installations for detailed water audits and potential water efficient retrofits. In addition, the end uses (toilets, sinks, showerheads, irrigation, etc.) with the greatest water savings potential are identified at each installation. This report is organized in the following manner. Following this Introduction, Section 2 provides important background information pertaining to the water analysis. Section 3 describes the methodology employed in the analysis, and Section 4 summarizes the study results. Section 5 prioritizes the installations based on both water/sewer savings and cost associated with water, sewer, and energy savings. Section 6 provides recommendations on where to start detailed water audits, as well as other recommendations. References are listed in Section 7. The appendices provide specific information on the analysis results and methodology, along with a discussion of special issues.

Fitzpatrick, Q.K.; McMordie, K.L.; Di Massa, F.V. [and others

1995-05-01T23:59:59.000Z

109

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

110

Environmental Assessment Kotzebue Wind Installation Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND INSTALLATION PROJECT KOTZEBUE, ALASKA AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The DOE is proposing to provide financial .assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska.

111

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

3-7: Booster Compressor Costs 3.5 Hydrogen PurificationkWh/kg includes compressor) Capital Costs Hydrogen EquipmentHydrogen Equipment Purifier Storage System Compressor Dispenser Additional Equipment Installation Costs

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

112

Evidence of Southern Health  

E-Print Network [OSTI]

POS Evidence of Coverage Southern Health Services, Inc. SH.POS.11-09 #12;Table of Contents SH................................................................................................10 Facts about Southern Health .....................................................................12 Members' Responsibilities to Know How and When to Seek Care ............................13 Section

Acton, Scott

113

Kim, Page 1 University of Southern California  

E-Print Network [OSTI]

. EDUCATION Ph.D. Computer Science, University of Southern California, CA. Thesis: Bounding the Cost Interfaces Conference, 2013 Poster Co-Chair AI in Education, 2013 Phone: (310) 448-8769 Fax : (310) 823, Research and Evaluation on Education in Science and Engineering (REESE), 2012 NSF Panel, Information

Kim, Jihie

114

Design and installation manual for thermal energy storage  

SciTech Connect (OSTI)

The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

1980-01-01T23:59:59.000Z

115

Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska  

SciTech Connect (OSTI)

The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

NONE

1998-05-01T23:59:59.000Z

116

Residential photovoltaic systems costs  

SciTech Connect (OSTI)

A study of costs associated with the installation and operation of a residential photovoltaic system has been conducted to determine present and projected (1986) status. As a basis for the study, a residential photovoltaic system design projected for 1986 was assumed, consisting of two principal components: a roof-mounted array and a utility-interactive inverter. The scope of the study encompassed both silicon and cadmium sulfide photovoltaic modules. Cost estimates were obtained by a survey and study of reports generated by companies and agencies presently active in each of the subsystem area. Where necessary, supplemental estimates were established as part of this study. The range of estimates for silicon-based systems strongly suggest that such systems will be competitive for new installations and reasonably competitive for retrofit applications. The cadmium-sulfide-based system cost estimates, which are less certain than those for silicon, indicate that these systems will be marginally competitive with silicon-based systems for new construction, but not competitive for retrofit applications. Significant variations from the DOE system price sub-goals were found, however, particularly in the areas of array mounting, wiring and cleaning. Additional development work appears needed in these areas.

Cox, C.H. III

1980-01-01T23:59:59.000Z

117

Help Your Employer Install Electric Vehicle Charging | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Help Your Employer Install Electric Vehicle Charging Help Your Employer Install Electric Vehicle Charging Help Your Employer Install Electric Vehicle Charging Educate your employer...

118

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Hydrogen production equipment Puri?er Storage system Compressor Dispenser Additional equipment Installation costshydrogen storage vessels and compressors. 2.4.4. Feedstock costhydrogen equipment costs. Meyers [2] pro- vides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

119

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

120

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Install Electric Vehicle Charging at Work  

Broader source: Energy.gov [DOE]

Employers who install workplace charging for plug-in electric vehicles (PEVs) demonstrate leadership, show a willingness to adopt advanced technology, and increase consumer exposure and access to...

122

Dynamically installed anchors for floating offshore structures.  

E-Print Network [OSTI]

??The gradual depletion of shallow water hydrocarbon deposits has forced the offshore oil and gas industry to develop reserves in deeper waters. Dynamically installed anchors (more)

Richardson, Mark Damian

2008-01-01T23:59:59.000Z

123

EM, County Install Sewer Line for Development  

Broader source: Energy.gov [DOE]

Crews are installing a sewer line in the Portsmouth site to connect EMs sewer treatment facility to the Pike County Manufacturing Center, which is being developed.

124

Hawaii Well Construction & Pump Installation Standards | Open...  

Open Energy Info (EERE)

and pump installation standards in Hawaii. Author State of Hawaii Commission on Water Resource Management Published State of Hawaii, 22004 DOI Not Provided Check for DOI...

125

Hawaii Well Construction & Pump Installation Standards Webpage...  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage provides...

126

WINDExchange: U.S. Installed Wind Capacity  

Wind Powering America (EERE)

The animation shows the progress of installed wind capacity between 1999 and 2013. The Energy Department's annual Wind Technologies Market Report provides information about wind...

127

Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical  

Broader source: Energy.gov (indexed) [DOE]

Southern Company: DOE Smart Grid RFI Addressing Policy and Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges. Southern recognizes that many policy and logistical concerns must be addressed for the promises of smart grid technologies and applications to be fully realized in ways that are beneficial, secure, and cost-effective lor utility customers. Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy

128

Low Cost Solar Water Heating R&D  

Broader source: Energy.gov (indexed) [DOE]

Template Template Low Cost Solar Water Heating R&D Kate Hudon National Renewable Energy Laboratory Kate.hudon@nrel.gov 303-275-3190 April 3, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: The major market barrier for solar water heaters (SWHs) is installed cost. This project addresses this barrier by working with an industry research partner to evaluate innovative solutions that reduce the installed cost of a SWH by

129

Cost Shifting  

Science Journals Connector (OSTI)

Abstract Cost shifting exists when a provider raises prices for one set of buyers because it has lowered prices for some other buyer. In theory, cost shifting can take place only if providers have unexploited market power. The empirical evidence on the extent of cost shifting is mixed. Taken as a whole, the evidence does not support the claims that cost shifting is a large and pervasive feature of the US health-care markets. At most, one can argue that perhaps one-fifth of Medicare payment reductions have been passed on to private payers. The majority of the rigorous studies, however, have found no evidence of cost shifting.

M.A. Morrisey

2014-01-01T23:59:59.000Z

130

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS  

E-Print Network [OSTI]

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS V.R. Kozak Budker Institute There was designed a set of devices for automation systems of physical installations. On this basis approach. KEY WORDS Automation, systems, applications, CANBUS, embedded, controller. 1. Introduction Budker

Kozak, Victor R.

131

Photovoltaic Installations at Williams College Ruth Aronoff  

E-Print Network [OSTI]

generation using solar power. Photovoltaic (PV) panel installations are a simple way for the College facilities, it is now evaluating in detail the environmental impact of these actions. In addition to making1 Photovoltaic Installations at Williams College Ruth Aronoff Williams Luce Project SUMMARY

Aalberts, Daniel P.

132

Arduino Tool: For Interactive Artwork Installations  

E-Print Network [OSTI]

The emergence of the digital media and computational tools has widened the doors for creativity. The cutting edge in the digital arts and role of new technologies can be explored for the possible creativity. This gives an opportunity to involve arts with technologies to make creative works. The interactive artworks are often installed in the places where multiple people can interact with the installation, which allows the art to achieve its purpose by allowing the people to observe and involve with the installation. The level of engagement of the audience depends on the various factors such as aesthetic satisfaction, how the audience constructs meaning, pleasure and enjoyment. The method to evaluate these experiences is challenging as it depends on integration between the artificial life and real life by means of human computer interaction. This research investigates "How Adriano fits for creative and interactive artwork installations?" using an artwork installation in the campus of NTNU (Norwegian University...

Shaikh, Murtaza Hussain

2012-01-01T23:59:59.000Z

133

Maximizing the Value of Photovoltaic Installations on Schools in California: Choosing the Best Electricity Rates  

SciTech Connect (OSTI)

Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.

Ong, S.; Denholm, P.

2011-07-01T23:59:59.000Z

134

cost savings  

National Nuclear Security Administration (NNSA)

reduced the amount of time involved in the annual chemical inventory for a cost savings of 18,282. Other presentations covered SRNS' award-winning employee suggestion...

135

BPA's Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPAsCosts Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance & Rates...

136

Finding Solutions to Solar's Soft Cost Dilemma | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding Solutions to Solar's Soft Cost Dilemma Finding Solutions to Solar's Soft Cost Dilemma Finding Solutions to Solar's Soft Cost Dilemma January 8, 2013 - 1:22pm Addthis Brian Webster installs rooftop solar panels on a home in Englewood, Colorado. The Energy Department is working to streamline rooftop solar installations so that its faster, easier and cheaper for Americans to go solar. | Photo courtesy of Dennis Schroeder, NREL. Brian Webster installs rooftop solar panels on a home in Englewood, Colorado. The Energy Department is working to streamline rooftop solar installations so that its faster, easier and cheaper for Americans to go solar. | Photo courtesy of Dennis Schroeder, NREL. Minh Le Minh Le Program Manager, Solar Program Learn More about Solar's Soft Costs Check out Clean Power Finance's study on solar's soft costs here.

137

Low-Cost Ventilation in Production Housing- Building America Top Innovation  

Broader source: Energy.gov [DOE]

This Building America Innovations profile describes Building America research on simple whole-house ventilation systems that cost less than $350 to install and meet code requirements.

138

Assessing the Environmental Costs and Benefits of Households Electricity Consumption Management.  

E-Print Network [OSTI]

?? In this study the environmental costs and benefits of smart metering technology systems installed in households in Norway have been assessed. Smart metering technology (more)

Segtnan, Ida Lund

2011-01-01T23:59:59.000Z

139

Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.  

SciTech Connect (OSTI)

Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

2011-12-01T23:59:59.000Z

140

Installed Geothermal Capacity | Open Energy Information  

Open Energy Info (EERE)

Geothermal Capacity Geothermal Capacity Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Installed Geothermal Capacity International Market Map of U.S. Geothermal Power Plants List of U.S. Geothermal Power Plants Throughout the world geothermal energy is looked at as a potential source of renewable base-load power. As of 2005 there was 8,933 MW of installed power capacity within 24 countries. The International Geothermal Association (IGA) reported 55,709 GWh per year of geothermal electricity. The generation from 2005 to 2010 increased to 67,246 GWh, representing a 20% increase in the 5 year period. The IGA has projected that by 2015 the new installed capacity will reach 18,500 MW, nearly 10,000 MW greater than 2005. [1] Countries with the greatest increase in installed capacity (MW) between

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

File:Install.pdf | Open Energy Information  

Open Energy Info (EERE)

Install.pdf Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 86 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:48, 1 November 2012 Thumbnail for version as of 13:48, 1 November 2012 1,275 × 1,650 (86 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Install.pdf&oldid=53281

142

Property:InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name InstalledCapacity Property Type Quantity Description Installed Capacity (MW) or also known as Total Generator Nameplate Capacity (Rated Power) Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

143

Performance of Installed Cooking Exhaust Devices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Brett C. Singer, William W. Delp, Michael G. Apte, Philip N. Price Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Berkeley, California, 94720 November 2011 Direct funding for this research was provided by the California Energy Commission through Contracts 500-05-026 and 500-08-061. Institutional support is provided to LBNL by the U.S. Department of Energy, Office of Science under Contract DE-AC02-05CH11231. LBNL-5265E-r1(3) Singer et al., Performance of Installed Cooking Exhaust Devices LBNL-5265E-r1(3) Performance of Installed Cooking Exhaust Devices Brett C. Singer 1

144

Cryogenic UHV installation for scanning tunneling microscopy  

Science Journals Connector (OSTI)

In this work we describe a helium cryostat with an ultrahigh vacuum chamber for placing the STM [H. By means of this installation it is possible to perform sample treatmentin situ (breaking, annealing, ion etchin...

V. S. Edelman; I. N. Khlyustikov

1996-01-01T23:59:59.000Z

145

Peoples Gas Single Family Direct Install (Illinois)  

Broader source: Energy.gov [DOE]

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

146

CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC  

Broader source: Energy.gov (indexed) [DOE]

-PNSO-0657 -PNSO-0657 CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC POWER GENERATION ARRAY AND ELECTRIC CAR CHARGING STATIONS, ENVIRONMENTAL MOLECULAR SCIENCES LABORATORY, PACIFIC NORTHWEST SITE OFFICE, RICHLAND, WASHINGTON Proposed Action The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to install a photovoltaic power generation array and electric car charging stations. Location of Action The proposed action would occur in a landscaped infiltration swale located immediately

147

New Jersey SmartStart Buildings - Direct Install Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program New Jersey SmartStart Buildings - Direct Install Program < Back Eligibility Commercial Industrial Local Government Nonprofit Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Construction Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Lesser of 70% of project costs or $75,000 per project; annual entity cap of $250,000 Program Info Funding Source New Jersey Societal Benefits Charge (public benefits fund); ARRA State New Jersey Program Type State Rebate Program Rebate Amount Varies Provider c/o TRC Energy Services The Direct Install program offers turn-key energy efficiency solutions to qualified industrial and commercial customers that, with some exceptions,

148

Energy Department Launches SunShot Prize Competition to Install Solar  

Broader source: Energy.gov (indexed) [DOE]

SunShot Prize Competition to Install SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price September 12, 2012 - 2:27pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Energy Department's SunShot Initiative, which is working to make solar energy competitive with other forms of energy without subsidy by the end of the decade, the Energy Department today announced the start of a new competition to make it faster, easier, and cheaper to install rooftop solar energy systems. The SunShot Prize makes a total of $10 million in cash awards available to the first three teams that repeatedly demonstrate the non-hardware costs, or price to plug

149

ConEd (Gas and Electric) - Small Business Direct Install Program (New York)  

Broader source: Energy.gov (indexed) [DOE]

ConEd (Gas and Electric) - Small Business Direct Install Program ConEd (Gas and Electric) - Small Business Direct Install Program (New York) ConEd (Gas and Electric) - Small Business Direct Install Program (New York) < Back Eligibility Commercial Savings Category Other Appliances & Electronics Commercial Lighting Lighting Heating & Cooling Commercial Heating & Cooling Program Info State New York Program Type Utility Rebate Program Rebate Amount Energy Survey: Free Programmable Thermostat: Free Equipment Upgrades Identified in Energy Survey: Con Edison will pay up to 70% of the remaining cost directly to the contractor ConEd is providing free energy surveys to its small business customers. The survey will take 30 to 90 minutes and efficiency opportunities and associated costs will be presented on the spot. If the customer agrees to

150

Electric power substation capital costs  

SciTech Connect (OSTI)

The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

Dagle, J.E.; Brown, D.R.

1997-12-01T23:59:59.000Z

151

SunShot Initiative Installs Solar Energy System | Department...  

Office of Environmental Management (EM)

SunShot Initiative Installs Solar Energy System SunShot Initiative Installs Solar Energy System Addthis 1 of 10 SunShot Initiative team members install a solar energy system on a...

152

Experimental Evaluation of Installed Cooking Exhaust Fan Performance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Experimental Evaluation of Installed Cooking Exhaust Fan Performance Experimental Evaluation of Installed Cooking Exhaust Fan Performance Title Experimental Evaluation of Installed Cooking Exhaust Fan Performance Publication Type Report LBNL Report Number LBNL-4183E Year of Publication 2010 Authors Singer, Brett C., William W. Delp, and Michael G. Apte Publisher Lawrence Berkeley National Laboratory City Berkeley Keywords airflow & pollutant transport group, cooktop, energy analysis and environmental impacts department, gas burners, indoor air quality, indoor environment department, kitchen, nitrogen dioxide, oven, pollutant emissions, range hood, residential, source control, task ventilation, technology, sustainability and impact assessment group Abstract The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners. Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g. single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from <5% to roughly 100%) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range systems that do not cover the front burners.

153

Southern Great Plains  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govSitesSouthern Great Plains govSitesSouthern Great Plains SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts Southern Great Plains SGP Central Facility, Lamont, OK 36° 36' 18.0" N, 97° 29' 6.0" W Altitude: 320 meters The Southern Great Plains (SGP) site was the first field measurement site established by DOE's Atmospheric Radiation Measurement (ARM) Program. Scientists are using the information obtained from the SGP to improve cloud and radiative models and parameterizations and, thereby, the performance of atmospheric general circulation models used for climate research.

154

Alternative Fuels Data Center: Installation of Alternative Fuel Components  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Installation of Installation of Alternative Fuel Components in Vehicles to someone by E-mail Share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Facebook Tweet about Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Twitter Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Google Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Delicious Rank Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Digg Find More places to share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on AddThis.com... More in this section... Federal

155

Utah Underground Storage Tank Installation Permit | Open Energy...  

Open Energy Info (EERE)

Underground Storage Tank Installation Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Utah Underground Storage Tank Installation Permit Form Type...

156

High-performance computer system installed at Los Alamos National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High-performance computer system installed at Lab High-performance computer system installed at Los Alamos National Laboratory New high-performance computer system, called Wolf,...

157

Utility Scale Renewable Energy Development Near DOD Installations...  

Broader source: Energy.gov (indexed) [DOE]

Utility Scale Renewable Energy Development Near DOD Installations: Making the Case for Land Use Compatitbility Utility Scale Renewable Energy Development Near DOD Installations:...

158

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations H2-Assisted NOx Traps: Test Cell Results Vehicle Installations 2003 DEER Conference Presentation: ArvinMeritor...

159

Obama Administration Announces Plans to Install New Solar Panels...  

Broader source: Energy.gov (indexed) [DOE]

Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 -...

160

Reduce generating costs and eliminate brownouts  

SciTech Connect (OSTI)

Improving the manoeuverability of a coal-fired plant to allow it to participate in primary frequency support will reduce generation cost and minimize brownouts. The challenge is to do so without compromising efficiency or emissions. This article describes an approach - activation of stored energy - that is cost-effective and applicable to both greenfield and brownfield installations. It requires a new control philosophy, plus the correct application of new level and flow measurement 'best practices'. 4 refs., 1 tab.

Nogaja, R.; Menezes, M. [Emerson Process Management (United States)

2007-06-15T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Electricity costs  

Science Journals Connector (OSTI)

... index is used to correct for inflation. The short answer is given by the Central Electricity Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The ... Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The cost per kWh of fuel. . . rose by 18.6 per cent (between 1979 ...

J.W. JEFFERY

1982-03-18T23:59:59.000Z

162

HOCL Installation Guide Chen WANG, Thierry PRIOL  

E-Print Network [OSTI]

Chemical Language) is a chemical programming language. Compu- tations can be seen as chemical reactions which are controlled by a set of chemical rules. We have an HOCL compiler developed in JAVA. This manual shows you how to install Java SDK in your machine. HOCL compiler is developed under Java platform, so

Boyer, Edmond

163

Installing Small Wind Turbines Seminar and Workshop  

E-Print Network [OSTI]

Seminar and Workshop Installing Small Wind Turbines Seminar and Workshop Location: Murdoch January 2011 Details for Registration and Payment: Mr Daniel Jones, National Small Wind Turbine Test: The National Small Wind Turbine Centre at Murdoch University is holding a Small Wind Turbine short training

164

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect (OSTI)

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

165

IEA HPP Annex 36 Installation/Quality  

E-Print Network [OSTI]

compiled and reviewed last week during meeting at EdF 10-11 October 2013 Submit final report to IEA HPP Ex#12;IEA HPP Annex 36 ­ Quality Installation/Quality Maintenance Van D. Baxter Oak Ridge National), USA 3 10-11 October 2013 EdF, France 4 12 May 2014 Workshop at IEA Heat Pump conference, Montreal

Oak Ridge National Laboratory

166

Offshore Wind Turbines and Their Installation  

Science Journals Connector (OSTI)

Offshore winds tend to be higher, more constant and not disturbed by rough terrain, so there is a large potential for utilizing wind energy near to the sea. Compared with the wind energy converters onland, wind turbine components offshore will subject ... Keywords: renewable energy, wind power generation, offshore wind turbines, offshore installation

Liwei Li; Jianxing Ren

2010-01-01T23:59:59.000Z

167

Performance of Installed Cooking Exhaust Devices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Title Performance of Installed Cooking Exhaust Devices Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5265E Year of Publication 2012 Authors Singer, Brett C., William W. Delp, Michael G. Apte, and Phillip N. Price Journal Indoor Air Volume 22 Issue 3 Pagination 224-234 Date Published 06/2012 Keywords carbon monoxide, natural gas burners, nitrogen dioxide, range hood, task ventilation, unvented combustion, indoor environment group, Range Hood Test Facility Abstract The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) - including exhaust fan/microwave combination appliances - were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

168

Cost of Adding E85 Fueling Capability to Existing Gasoline Stations: NREL Survey and Literature Search (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet provides framework for gas station owners to access what a reasonable cost would be to install E85 infrastructure.

Not Available

2008-03-01T23:59:59.000Z

169

Estimated Cost Description Determination Date:  

Broader source: Energy.gov (indexed) [DOE]

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

170

High Performance Home Cost Performance Trade-Offs: Production Builders- Building America Top Innovation  

Broader source: Energy.gov [DOE]

This Building America Innovations profile describes Building America research showing how some energy-efficiency measure cost increases can balance again measures that reduce up-front costs: Advanced framing cuts lumber costs, right sizing can mean downsizing the HVAC, moving HVAC into conditioned space cuts installation costs, designing on a 2-foot grid reduces materials waste, etc.

171

NV Energy (Southern Nevada) - SureBet Business Energy Efficiency Rebate  

Broader source: Energy.gov (indexed) [DOE]

Southern Nevada) - SureBet Business Energy Efficiency Southern Nevada) - SureBet Business Energy Efficiency Rebate Program NV Energy (Southern Nevada) - SureBet Business Energy Efficiency Rebate Program < Back Eligibility Agricultural Commercial Construction Fed. Government Industrial Installer/Contractor Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heating Appliances & Electronics Commercial Lighting Lighting Manufacturing Windows, Doors, & Skylights Program Info State Nevada Program Type Utility Rebate Program Rebate Amount '''Existing Facilities''' T-8 Lamps: $2 - $7/lamp T-8/T-5 High Bay Replacement for HID: $0.30/watt reduced Delamping of T-12: $4 - $9

172

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable) costs apply

Boisvert, Jeff

173

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408 ­ off-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable

Boisvert, Jeff

174

Energy Technology Cost and Performance Data | OpenEI  

Open Energy Info (EERE)

Technology Cost and Performance Data Technology Cost and Performance Data Dataset Summary Description This data indicates the range of recent cost estimates for renewable energy and other technologies. The estimates are shown in dollars per installed kilowatts of generating capacity. This data provides a compilation of available national-level cost data from a variety of sources. Costs in your specific location will vary. All costs are in 2006 dollars per installed kilowatts in the United States. Source NREL Date Released August 06th, 2009 (5 years ago) Date Updated August 06th, 2009 (5 years ago) Keywords analysis Department of Energy DOE National Renewable Energy Laboratory Data application/vnd.ms-excel icon Energy Technology Cost and Performance Data (xls, 107.5 KiB) text/csv icon Capacity Factor (csv, 1.8 KiB)

175

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility  

SciTech Connect (OSTI)

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

Jack Q. Richardson

2012-06-28T23:59:59.000Z

176

Small Wind Guidebook/Where Can I Find Installation and Maintenance Support  

Open Energy Info (EERE)

Where Can I Find Installation and Maintenance Support Where Can I Find Installation and Maintenance Support < Small Wind Guidebook Jump to: navigation, search Print PDF WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook Home WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical for Me? * What Size Wind Turbine Do I Need? * What Are the Basic Parts of a Small Wind Electric System? * What Do Wind Systems Cost? * Where Can I Find Installation and Maintenance Support? * How Much Energy Will My System Generate? * Is There Enough Wind on My Site? * How Do I Choose the Best Site for My Wind Turbine? * Can I Connect My System to the Utility Grid? * Can I Go Off-Grid? * State Information Portal * Glossary of Terms * For More Information

177

Encirclement sleeves reduce pipeline repair costs  

SciTech Connect (OSTI)

Welded sleeve, or replacement of line repair methods have been used successfully for many years in the pipeline industry but can lead to other difficulties for a pipeline operator. Clock Spring`s composite sleeves have been used in over ten thousand pipeline repairs with pipe sizes ranging from 6- to 56-inches in diameter, all without costly shutdown, welding or purging. Repairs can be completed while the pipeline is fully operational and require only six inches of clearance under the pipe for wrapping the eight thicknesses of the coil. This minimizes costly digging and backfilling over long runs of pipe and necessary shoring for personnel safety. Also it provides a more cost-effective alterative to conventional pipeline repair since special handling, lifting, or installation equipment is not needed. This paper reviews the installation and performance of these sleeves.

NONE

1996-01-01T23:59:59.000Z

178

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

179

Direct costing  

E-Print Network [OSTI]

oau 5e reduced. Under the same oonOitions, even ~Me on a bread scale entails not mere1y the conduct of the direct oyeraticns cf yrccessing the materials into finished products, but also the performance of auxiliary functions. these may 'ba power y... purposes have been advanced as folkway le Most of a o03RyaxO' 8 products Grc usual13r sold at prices which oovex' full product costs y plus 861ling a%el administrative expenses, plus normal profit. The inventoi~ valuate. on should be consistent...

Browning, Donald Bullock

2012-06-07T23:59:59.000Z

180

The Least-cost Hydrogen for Southern California Zhenhong Lin*  

E-Print Network [OSTI]

and maintenance SMR = steam methane reforming tonC = one ton of carbon VMT = vehicle miles traveled 1

Fan, Yueyue

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Cost Analysis Rate Settin  

E-Print Network [OSTI]

Cost Analysis and Rate Settin for Animal Research Facilities #12;#12;Cost Analysis and Rate ... .. . ...................... . . . ................................. . .... 7 Chapter 2 Preparation for Cost Analysis ......................................................... 9 Chapter 3 Assignment of Costs to Animal Research Facility Cost Centers

Baker, Chris I.

182

Southern Enclave Issue 20  

E-Print Network [OSTI]

): WOOKIEE COMMODE #4, edited by Mary Urhausen and Samia Martz "Sword of Sorrow/Sword of Hope" by Patricia D'Orazio SHADOWS (ABODE OF STRIFE #6), edited by Bill Hupe "The Daystrom Project" by Rick Endres Gayle Feyrer SOUTHERN SEVEN #2, edited by Ann...

1988-01-01T23:59:59.000Z

183

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

SciTech Connect (OSTI)

The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

2012-03-26T23:59:59.000Z

184

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

185

SunShot Initiative: Reducing Non-Hardware Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reducing Non-Hardware Costs Reducing Non-Hardware Costs DOE supports efforts to dramatically reduce the non-hardware, balance of systems costs associated with solar energy systems. Representing as much as 64% of the total installed system price, these "soft costs" include: Customer Acquisition Financing and Contracting Permitting, Interconnection, and Inspection Installation and Performance Operations and Maintenance. To meet SunShot goals, the industry must innovate new ways to automate and speed processes that make it easier for consumers, businesses, utilities, solar companies, and others to install solar projects. For example, novel software solutions now allow solar companies to design systems and provide accurate quotes using satellite images rather than conducting full site visits.

186

NREL: News - NREL Reports Soft Costs Now Largest Piece of Solar  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News Release NR-6313 News Release NR-6313 NREL Reports Soft Costs Now Largest Piece of Solar Installation Total Cost December 2, 2013 Two detailed reports from the Energy Department's National Renewable Energy Laboratory (NREL) find that solar financing and other non-hardware costs - often referred to as "soft costs" - now comprise up to 64% of the total price of residential solar energy systems, reflecting how soft costs are becoming an increasingly larger fraction of the cost of installing solar. "The two new reports, along with previous reports, provide a comprehensive look at the full cost of installing solar, while delineating and quantifying the various contributors to that final cost," NREL analyst Barry Friedman said. The first new report, "Benchmarking Non-Hardware Balance-of-System (Soft)

187

Solar Schools Assessment and Implementation Project: Financing Options for Solar Installations on K-12 Schools  

SciTech Connect (OSTI)

This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV) systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.

Coughlin, J.; Kandt, A.

2011-10-01T23:59:59.000Z

188

Energy Saving 'Cool Roofs' Installed at Y-12 | Y-12 National Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Saving 'Cool ... Saving 'Cool ... Energy Saving 'Cool Roofs' Installed at Y-12 Posted: October 17, 2012 - 4:08pm The Y-12 National Security Complex has taken additional steps to reduce its energy costs by installing almost 100,000 square feet of new heat reflective "cool" roofs at the Oak Ridge, Tennessee facility. The latest Y-12 cool roofs were added to Buildings 9204-2E and 9103. Fifteen percent of roofs at Y-12 are currently equipped with cool roof technology. This technology is expected to be applied to the majority of the roofs at Y-12. "Replacing older, heat-absorbing roofs with the heat-reflective cool roofs is part of NNSA's strategy to achieve energy and cost efficiencies," said Robert "Dino" Herrera, Facilities and Infrastructure Recapitalization Program Manager. "We strive to lead the

189

Cost Sharing What is Cost Sharing?  

E-Print Network [OSTI]

1 Cost Sharing What is Cost Sharing? x Cost sharing is a commitment to use university resources and Expenses o Equipment x Committing to cost share is highly discouraged unless required by the sponsoring agency x Tracking of committed cost share is required to meet federal regulations (OMB A-110) x UCSD has

Tsien, Roger Y.

190

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

191

Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States  

Broader source: Energy.gov [DOE]

For the United States to ensure that the substantial rollout of offshore wind energy projects envisioned by the DOE is carried out in an efficient and cost-effective manner, it is important to observe the current and emerging practices in the international offshore wind energy industry. In this manner, the United States can draw from the experience already gained around the world, combined with experience from the sizeable U.S. land-based wind industry, to develop a strong offshore wind sector. The work detailed in this report will support that learning curve by enabling optimization of the cost-effectiveness of installation, operation, and maintenance activities for offshore wind farms.

192

Cost Sharing Basics Definitions  

E-Print Network [OSTI]

Cost Sharing Basics Definitions Some funding agencies require the grantee institution the project costs. Cost sharing is defined as project costs not borne by the sponsor. Cost sharing funds may resources or facilities. If the award is federal, only acceptable non-federal costs qualify as cost sharing

Finley Jr., Russell L.

193

Costs Associated With Compressed Natural Gas Vehicle Fueling Infrastructure  

SciTech Connect (OSTI)

This document is designed to help fleets understand the cost factors associated with fueling infrastructure for compressed natural gas (CNG) vehicles. It provides estimated cost ranges for various sizes and types of CNG fueling stations and an overview of factors that contribute to the total cost of an installed station. The information presented is based on input from professionals in the natural gas industry who design, sell equipment for, and/or own and operate CNG stations.

Smith, M.; Gonzales, J.

2014-09-01T23:59:59.000Z

194

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

195

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

196

Energy Department Launches SunShot Prize Competition to Install...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

197

Helping Ensure High-Quality Installation of Solar Power Technologies...  

Energy Savers [EERE]

Ensure High-Quality Installation of Solar Power Technologies Helping Ensure High-Quality Installation of Solar Power Technologies April 15, 2013 - 12:00am Addthis The Midwest...

198

Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Home Field Offices Welcome to the NNSA Production Office NPO News Releases Energy Saving "Cool Roofs" Installed at Y-12 Energy Saving "Cool Roofs" Installed at Y-12 The...

199

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

200

FULL-COST ACCOUNTING  

Science Journals Connector (OSTI)

FULL-COST ACCOUNTING ... Environmental costs would be built into a product's cost, and consumers would be able to make informed purchases. ...

1993-01-11T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Performance of Installed Cooking Exhaust Devices  

SciTech Connect (OSTI)

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) including exhaust fan/microwave combination appliances were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

202

Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)  

SciTech Connect (OSTI)

This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a countrys safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.

Trond Bjornard; Philip C. Durst

2012-05-01T23:59:59.000Z

203

RMP Standard PreInstalled Software Page 1 of 2  

E-Print Network [OSTI]

RMP Standard PreInstalled Software Page 1 of 2 Standard Software PreInstalled with RMP Windows@lmu.edu or 310-338-7777 RMP Standard PreInstalled Software Page 2 of 2 · Photo Booth EndNote Apple DVD Player

Dahlquist, Kam D.

204

Cost-Effectiveness Ratio  

Science Journals Connector (OSTI)

The cost?effectiveness ratio (CER) is acalculation that summarizes the intervention's net cost and effectiveness. The three types of CER are: the average cost?effectiveness ratio (ACER), the marginal cost?...

2008-01-01T23:59:59.000Z

205

Cost Share-Cost Reimbursement Invoice Format Example | The Ames...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Share-Cost Reimbursement Invoice Format Example Effective Date: 102014 File (public): Cost Share-Cost...

206

Page 1 of 5 Installation Name ____________________________________________________________  

E-Print Network [OSTI]

these costs. 3) References U. S. Army Corps of Engineers Solids Handling Checklist #12;06/07/99 Page 2 of 5. ______________________________________________________________________________ ______________________________________________________________________________ b) Sketch the process flow diagram (PFD), including valves and instrument locations, on the back) Operating Pressure: 100 psi. 225 psi. Other Feed pH: Feed Temperature: Materials of construction: Plates

US Army Corps of Engineers

207

CNTA_Well_Installation_Report.book  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nuclear Security Administration Nuclear Security Administration Nevada Site Office Environmental Restoration Division Nevada Environmental Restoration Project Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye County, Nevada Revision No.: 0 January 2006 Approved for public release; further dissemination unlimited. DOE/NV--1102 Uncontrolled When Printed Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from:

208

Neutron scattering instrumentation at reactor based installations  

Science Journals Connector (OSTI)

During the past decade neutron scattering techniques have been applied to an increasingly wide range of scientific problems. Concurrently a number of substantial improvements of neutron scattering instrumentation have occurred to stimulate this trend. In this article several such developments which have occurred at reactor?based installations are described. Individual spectrometer components which are discussed in some detail include: neutron?optical devices such as guide tubes supermirrors and multilayer systems; neutronmonochromators with optimum reflectivity mosaic and focusing characteristics; position?sensitive detectors of several types; and equipment required for neutronpolarizationanalysis. Several novel spectrometers which have enhanced the role of neutron scattering during the past ten years are also described. These include spectrometers for small?angle scattering backscattering and neutron spin echo. An extensive bibliography is included which covers both early and more recent developments.

Roger Pynn

1984-01-01T23:59:59.000Z

209

Modular Integrated Monitoring System (MIMS) field test installations  

SciTech Connect (OSTI)

The MIMS program is funded by the Department of Energy under the Office of Nonproliferation and National Security. The program objective is to develop cost effective, modular, multi-sensor monitoring systems. Both in-plant and ground based sensors are envisioned. It is also desirable to develop sensors/systems that can be fielded/deployed in a rapid fashion. A MIMS architecture was selected to allow modular integration of sensors and systems and is based on LonWorks technology, commercially developed by Echelon Corporation. The first MIMS fieldable hardware was demonstrated at Lawrence Livermore National Laboratory. The field test, known within the DOE as the Item Tracking and Transparency (IT&I) demonstration, involved the collaboration and cooperation of five DOE laboratories (Sandia (SNL), Lawrence Livermore (LLNL), Pacific Northwest (PNL), Los Alamos (LANL), and Oak Ridge (ORNL)). The IT&T demonstration involved the monitoring of special nuclear material as it was transported around the facility utilizing sensors from the participating labs. The scenario was programmed to ignore normal activity in the facility until entry into the room where the material was stored. A second demonstration, which involved three separate scenarios, was conducted at Idaho National Engineering Laboratory (INEL). The participants included representatives from SNL, LLNL, PNL, and INEL. DOE has selected INEL as the long term testbed for MIMS developed sensors, systems, and scenarios. This paper will describe the installation, intended purpose, and results of the field demonstrations at LLNL and INEL under the MIMS program.

Martinez, R.L.; Waymire, D.R. [Sandia National Labs., Albuquerque, NM (United States); Fuess, D.A. [Lawrence Livermore National Lab., CA (United States)] [and others

1995-07-01T23:59:59.000Z

210

Using Challenge Cost-Share Partnerships to Communicate with Ethnically Diverse Recreation Users in  

E-Print Network [OSTI]

Using Challenge Cost-Share Partnerships to Communicate with Ethnically Diverse Recreation Users in Southern California1 Thomas W. Spencer Robert E. Pfister2 Abstract: Recreation managers have established more effective communication with dispersed recreation users of the Angeles National Forest in southern

Standiford, Richard B.

211

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Surged by 46% in 2007, with 5,329 MW Added and $9 Billion Invested . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 Wind Power Contributed 35% of All New U.S. Electric Generating Capacity in 2007 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 The United States Continued to Lead the World in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 Texas Easily Exceeded Other States in Annual Capacity Growth . . . . . . .6 Data from Interconnection Queues Demonstrate that an Enormous Amount of Wind Capacity Is Under Development . . . . . . . . . .9 GE Wind Remained the Dominant Turbine Manufacturer, but a Growing Number of Other Manufacturers Are Capturing Market Share .

212

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 U.S. Wind Power Capacity Increased by 27% in 2006 . . . . . . . . . . . . . . . .4 The United States Leads the World in Annual Capacity Growth . . . . . . . .4 Texas, Washington, and California Lead the U.S. in Annual Capacity Growth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with Siemens Gaining Market Share . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Average Turbine Size Continues to Increase . . . . . . . . . . . . . . . . . . . . . . .7 Developer Consolidation Accelerates . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Innovation and Competition in Non-Utility Wind Financing Persists . . . .9 Utility Interest in Wind Asset Ownership Strengthens; Community Wind Grows Modestly . . . . . . . . . . . .

213

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

sources and others, e.g. , Windpower Monthly and the Globalmanufacturer Clipper Windpower is in the process ofutilities commissions, Windpower Monthly magazine, AWEAs

2008-01-01T23:59:59.000Z

214

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

For more information contact: EERE Information Center1-877-EERE-Inf (1-877-337-3463) www.eere.energy.gov Mark

2008-01-01T23:59:59.000Z

215

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

2003-2006 Date Study Xcel-UWIG We Energies Wind Capacitybeen a considerable 2004 Xcel-MNDOC na na amount of analysisconcerns about whether the 2006 Xcel-PSCo na electrical grid

2008-01-01T23:59:59.000Z

216

Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.  

SciTech Connect (OSTI)

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.

2013-05-01T23:59:59.000Z

217

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

of the U.S. DOEs Wind & Hydropower Technologies Program. Weand Renewable Energy (Wind & Hydropower Technologies ProgramManager Office of Wind and Hydropower Technologies Energy

2008-01-01T23:59:59.000Z

218

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network [OSTI]

power to others, sometimes taking some merchant risk 10 in the windwind power, with 47% of new 2006 capacity and 58% of cumulative capacity selling power to

2008-01-01T23:59:59.000Z

219

Cost of heliostats in low volume production  

SciTech Connect (OSTI)

This study indicates that in small volumes, heliostats can be produced at an installed cost of approximately 200 $/M/sup 2/ for a 49.053 m/sup 2/ heliostat. Initial one-time costs of $10 to $15 million would be required, although part of the one-time costs are recoverable. This study provides estimated costs of heliostats that are produced in a plant operating on a continuous basis for a period of four years at a production rate of 2,500 heliostats per year. This scenario was selected somewhat arbitrarily as a scenario that could lead to heliostat market of 5,000 to 10,000 units per year.

Drumheller, K.; Williams, T. A.; Dilbeck, R. A.; Allison, G. S.

1980-01-01T23:59:59.000Z

220

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Research and Development of a Low Cost Solar Collector  

SciTech Connect (OSTI)

This is a Final Technical Report on the Research and Development completed towards the development of a Low Cost Solar Collector conducted under the DOE cost-sharing award EE-0003591. The objective of this project was to develop a new class of solar concentrators with geometries and manufacturability that could significantly reduce the fully installed cost of the solar collector field for concentrated solar thermal power plants. The goal of the project was to achieve an aggressive cost target of $170/m2, a reduction of up to 50% in the total installed cost of a solar collector field as measured against the current industry benchmark of a conventional parabolic trough. The project plan, and the detailed activities conducted under the scope of the DOE Award project addressed all major drivers that affect solar collector costs. In addition to costs, the study also focused on evaluating technical performance of new collector architectures and compared them to the performance of the industry benchmark parabolic trough. The most notable accomplishment of this DOE award was the delivery of a full-scale integrated design, manufacturing and field installation solution for a new class of solar collector architecture which has been classified as the Bi-Planar Fresnel Collector (BPFC) and may be considered as a viable alternative to the conventional parabolic trough, as well as the conventional Fresnel collectors. This was in part accomplished through the design and development, all the way through fabrication and test validation of a new class of Linear Planar Fresnel Collector architecture. This architecture offers a number of key differentiating features which include a planar light-weight frame geometry with small mass-manufacturable elements utilizing flat mirror sections. The designs shows significant promise in reducing the material costs, fabrication costs, shipping costs, and on-site field installation costs compared to the benchmark parabolic trough, as well as the conventional Fresnel collector. The noteworthy design features of the BPFC architecture include the use of relatively cheaper flat mirrors and a design which allows the mirror support beam sections to act as load-bearing structural elements resulting in more than a 36% reduction in the overall structural weight compared to an optimized parabolic trough. Also, it was shown that the utilization of small mass-produced elements significantly lowers mass-production and logistics costs that can more quickly deliver economies of scale, even for smaller installations while also reducing shipping and installation costs. Moreover, unlike the traditional Fresnel trough the BPFC architecture does not require complex articulating drive mechanisms but instead utilizes a standard parabolic trough hydraulic drive mechanism. In addition to the development of the Bi-Planar Fresnel Collector, an optimized conventional space-frame type parabolic trough was also designed, built, analyzed and field-tested during the first phase of this award. The design of the conventional space-frame parabolic collector was refined with extensive FEA and CFD analysis to reduce material costs and re-designed for simpler fabrication and more accurate lower-cost field assembly. This optimized parabolic trough represented an improvement over the state-of-the art of the traditional parabolic trough architecture and also served as a more rigorous and less subjective benchmark that was used for comparison of new candidate design architectures. The results of the expanded 1st phase of the DOE award project showed that both the Optimized Parabolic Trough and the new Bi-Planar Fresnel Collector design concepts failed to meet the primary objectives for the project of achieving a 50% cost reduction from the industry reference total installed cost of $350/m2. Results showed that the BPFC came in at projected total installed cost of $237/m2 representing a 32% savings compared to the industry benchmark conventional parabolic trough. And the cost reduction obtained by the Optimized Parabolic Trough compared to the

Ansari, Asif; Philip, Lee; Thouppuarachchi, Chirath

2012-08-01T23:59:59.000Z

222

Microsoft Word - SouthernOhioAward20030717.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 Energy Department Awards $300,000 Grant to the Southern Ohio Diversification Initiative WASHINGTON, DC - The Department of Energy (DOE) today announced that it will award $300,000 to the Southern Ohio Diversification Initiative (SODI), the community reuse organization (CRO) for the department's Portsmouth Gaseous Diffusion Plant. This grant will be used to help fund SODI's general administrative costs which will enable the CRO to manage ongoing community transition projects. "The Energy Department is a good neighbor to the communities surrounding our sites," Secretary of Energy Spencer Abraham said. "We will continue to work with the Southern Ohio Diversification Initiative and congressional leaders, like Rob Portman, to retain, expand or

223

Investigating the option of installing small scale \\{PVs\\} on facility rooftops in a green supply chain  

Science Journals Connector (OSTI)

Abstract Industry practitioners and policy makers are under increasing pressure to promote green supply chains through the integration of renewable energy sources. Changing facilities from net energy users to net energy producers is a major concern for supply chain managers who are interested in greening their business. Building integrated photovoltaics (BIPV) is an innovative design idea to achieve energy positive buildings. In a BIPV building, photovoltaic (PV) arrays are integrated into the structure of the building in order to transform the incident solar radiation to clean energy that can be used in facility operations. This option is dependent on the economic attractiveness of the solar PVs, which, in return, depends on the policies (incentives, subsidies, feed-in tariff) in effect at the facility location, the efficiency of the \\{PVs\\} installed, and the amount of incident solar radiation at the facility location. We present an economic model that calculates the cost per kWh capacity of solar \\{PVs\\} installed and then integrate the decision of installing \\{PVs\\} of different sizes on the facility rooftops of a supply chain subject to the different environmental policies available. We study the implications of our model based on a sensitivity analysis for different carbon credit prices, PV generation costs, and feed-in tariff prices.

Tarek Abdallah; Ali Diabat; Jasper Rigter

2013-01-01T23:59:59.000Z

224

Southern California Channel Islands Bibliography, through 1992  

E-Print Network [OSTI]

Southern California Bight/San Pedro Basin/San Nicolas Basin/the Southern California Bight: California Basin Study: DOE (from Tanner Basin, Southern California Bight. Annu. Rep. to

Channel Islands National Marine Sanctuary

1992-01-01T23:59:59.000Z

225

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects,  

Broader source: Energy.gov (indexed) [DOE]

27 Million to Reduce Costs of Solar Energy Projects, 27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations June 1, 2011 - 12:00am Addthis WASHINGTON, DC - As part of the Obama Administration's SunShot Initiative to make solar energy cost-competitive with fossil fuels within the decade, U.S. Department of Energy Secretary Steven Chu today announced the availability of more than $27 million in new funding that will reduce the non-hardware costs of solar energy projects, a critical element in bringing down the overall costs of installed solar energy systems. The funding will support a $12.5 million challenge to encourage cities and counties to compete to streamline and digitize permitting processes, as

226

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects,  

Broader source: Energy.gov (indexed) [DOE]

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations June 1, 2011 - 12:00am Addthis WASHINGTON, DC - As part of the Obama Administration's SunShot Initiative to make solar energy cost-competitive with fossil fuels within the decade, U.S. Department of Energy Secretary Steven Chu today announced the availability of more than $27 million in new funding that will reduce the non-hardware costs of solar energy projects, a critical element in bringing down the overall costs of installed solar energy systems. The funding will support a $12.5 million challenge to encourage cities and counties to compete to streamline and digitize permitting processes, as

227

Installation considerations for IGBT AC drives  

SciTech Connect (OSTI)

In the last four years, Adjustable Speed ac Drive (ASD) manufacturers have migrated from Bipolar Junction Transistor (BJT) semiconductors to Insulated Gate Bipolar Transistors (IGBTs) as the preferred Output switching device. The advantage of IGBTs over BJTs is that device rise and fall time switching capability is 5 - 10 times faster, resulting in lower device switching loss and a more efficient drive. However, for a similar motor cable length as the BJT drive, the faster output voltage risetime of the IGBT drive may increase the dielectric voltage stress on the motor and cable due to a phenomenon called reflected wave. Faster output dv/dt transitions of IGBT drives also increase the possibility for phenomenon such as increased Common Mode (CM) electrical noise, Electromagnetic Interference (EMI) problems and increased capacitive cable charging current problems. Also, recent experience suggests any Pulse Width Modulated (PWM) drive with a steep fronted output voltage wave form may increase motor shaft voltage and lead to a bearing current phenomenon known as fluting. This paper provides a basic understanding of these issues, as well as solutions, to insure a successful drive system installation.

Skibinski, G.L.

1997-06-01T23:59:59.000Z

228

Gasket and snap ring installation tool  

DOE Patents [OSTI]

A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

Southerland, Jr., James M. (Aiken, SC); Barringer, Jr., Curtis N. (Orangeburg, SC)

1994-01-01T23:59:59.000Z

229

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

230

Southern African Data Sets Available  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

thirteen new Southern African data thirteen new Southern African data sets. Originally offered on the second CD-ROM volume prepared for the Southern African Regional Science Initiative (SAFARI 2000) by the Goddard Space Flight Center, these data sets contain meteorological, aerosol, atmospheric chemistry, and precipitation data. In addition, this data release includes a new data set that compares Advanced Spaceborne Thermal Emission and Reflection (ASTER) and Resolution Imaging Spectroradiometer (MODIS) fire data from the dry season 2001. The SAFARI 2000 project was conducted during 1999-2001 to develop a better understanding of the earth-atmosphere-human system in southern Africa. These data sets focus primarily on the 2000 dry season— and September— the southern African region, defined as latitude 5° N to 35° S and

231

Have a great idea about how to cut the cost of solar panel installatio...  

Open Energy Info (EERE)

Have a great idea about how to cut the cost of solar panel installation? Home > Groups > Buildings Dc's picture Submitted by Dc(107) Contributor 7 November, 2014 - 12:13 As prices...

232

Installing and Maintaining a Home Solar Electric System | Department of  

Broader source: Energy.gov (indexed) [DOE]

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

233

Installing and Maintaining a Small Wind Electric System | Department of  

Broader source: Energy.gov (indexed) [DOE]

Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System July 2, 2012 - 8:22pm Addthis Installing and Maintaining a Small Wind Electric System What does this mean for me? When installing a wind system, the location of the system, the energy budget for the site, the size of the system, and the height of the tower are important elements to consider. Deciding whether to connect the system to the electric grid or not is also an important decision. If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system

234

Solar Industry At Work: Streamlining Home Solar Installation | Department  

Broader source: Energy.gov (indexed) [DOE]

Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation Solar Industry At Work: Streamlining Home Solar Installation June 12, 2012 - 11:59am Addthis Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Sunrun is a home solar installation company based in San Francisco. | Photo by Francis Fine Art Photography. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Tillie Peterson works at Sunrun a home solar installation company based in San Francisco. As Director of Operations, Tillie works to get solar panels up and running for homeowners as simply and quickly as possible. Our Solar Industry At Work Series shares the personal success of

235

Installing and Maintaining a Home Solar Electric System | Department of  

Broader source: Energy.gov (indexed) [DOE]

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

236

Spain Installed Wind Capacity Website | Open Energy Information  

Open Energy Info (EERE)

Spain Installed Wind Capacity Website Spain Installed Wind Capacity Website Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Spain_Installed_Wind_Capacity_Website&oldid=514562"

237

Property:Incentive/InstallReqs | Open Energy Information  

Open Energy Info (EERE)

InstallReqs InstallReqs Jump to: navigation, search Property Name Incentive/InstallReqs Property Type Text Description Installation Requirements. Pages using the property "Incentive/InstallReqs" Showing 25 pages using this property. (previous 25) (next 25) A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + Self-installed measures with a rebate level greater than $1,000 and all applications over $20,000, and 5% of remaining applicants will be inspected. Funds can be reserved for a period of 180 days as long as the application includes an expected date of project completion. Customer must have an active account in WV with either Wheeling Power Company, American Electric Power or Appalachian Power Company.

238

Rhode Island Stormwater Design and Installation Standards Manual (Rhode  

Broader source: Energy.gov (indexed) [DOE]

Rhode Island Stormwater Design and Installation Standards Manual Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) Rhode Island Stormwater Design and Installation Standards Manual (Rhode Island) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Rhode Island Program Type Environmental Regulations

239

DoD Energy Innovation on Military Installations  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

LPG Other Test Bed Focus 4 Smart Secure Installation Energy Management * Microgrids * Energy Storage * Ancillary Service Markets Efficient Integrated Buildings * Design,...

240

PNNL Reports Distributed Wind Installations Down, Exports Up...  

Energy Savers [EERE]

soon to be published by DOE's Pacific Northwest National Laboratory, U.S. wind turbines in distributed applications reached a cumulative installed capacity of 842 MW at...

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

High-performance computer system installed at Los Alamos National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High-performance computer system installed at Los Alamos National Laboratory Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:January 2015 All...

242

Focus Series: MaineResidential Direct Install Program  

Broader source: Energy.gov [DOE]

Better Buildings Neighborhood Program Focus Series: MaineResidential Direct Install Program: Residential Air Sealing Program Drives Maine Home Energy Savings Through the Roof.

243

Install Waste Heat Recovery Systems for Fuel-Fired Furnaces  

Broader source: Energy.gov [DOE]

This tip sheet recommends installing waste heat recovery systems for fuel-fired furnaces to increase the energy efficiency of process heating systems.

244

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations  

Broader source: Energy.gov (indexed) [DOE]

Sam Crane August 28, 2003 H 2 -Assisted NOx Traps: Test Cell Results Vehicle Installations 2 Project Objectives * Determine Advantages of H 2 Assisted NO x Trap Regeneration *...

245

Installer Issues: Integrating Distributed Wind into Local Communities (Presentation)  

SciTech Connect (OSTI)

A presentation for the WindPower 2006 Conference in Pittsburgh, PA, regarding the issues facing installer of small wind electric systems.

Green, J.

2006-06-01T23:59:59.000Z

246

Reviewing Post-Installation and Annual Reports for Federal ESPC...  

Broader source: Energy.gov (indexed) [DOE]

Post-Installation and Annual Reports for Federal ESPC Projects The purpose of this document is to provide a framework for implementing uniform and consistent reviews of...

247

Project examples Install new HVAC, electrical, fire protection,  

E-Print Network [OSTI]

Project examples Install new HVAC, electrical, fire protection, and plumbing systems in Mechanical. · Totransformthisspaceandincreaseaccessibility, anelevatorisrequired.Currently,Blakelydoesnot haveone. Replace HVAC and electrical system

Blanchette, Robert A.

248

INSTALLATION, COMMISSIONING AND TROUBLE SHOOTING OF VARIABLE FREQUENCY DRIVE.  

E-Print Network [OSTI]

??In this thesis, the installation of variable frequency drive on board a ship is introduced briefly. In this particular study the variable frequency drive was (more)

Kuituniemi, Santtu

2013-01-01T23:59:59.000Z

249

DOE-DOD Emergency Backup Power Fuel Cell Installations  

Fuel Cell Technologies Publication and Product Library (EERE)

Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

250

NREL Job Task Analysis: Retrofit Installer Technician | Department...  

Broader source: Energy.gov (indexed) [DOE]

51671.pdf More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician (Revised) NREL Job Task Analysis: Energy Auditor trainingselfassessment.xlsx...

251

NREL Job Task Analysis: Retrofit Installer Technician (Revised...  

Broader source: Energy.gov (indexed) [DOE]

installerjta04112012.pdf More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Energy Auditor trainingselfassessment.xlsx...

252

Cost Study Manual  

Broader source: Energy.gov (indexed) [DOE]

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

253

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

254

Levelized Electricity Costs  

Science Journals Connector (OSTI)

The concept of levelized energy costs responds to the necessity of disclosing the ... in order to recover the total life cycle cost of energy production. This chapter charts the effectiveness of levelized cost fo...

Nuno Luis Madureira

2014-01-01T23:59:59.000Z

255

SunShot Initiative: Low-Cost, Lightweight Solar Concentrators  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost, Lightweight Solar Concentrators Cost, Lightweight Solar Concentrators JPL logo Graphic of two dishes, mounted to the ground, that are side-by-side. This graphic shows the JPL/L'Garde lightweight concentrator facets, which are deployed for different configurations. The Jet Propulsion Laboratory (JPL), with funding from the 2012 SunShot Concentrating Solar Power (CSP) R&D FOA, is designing an optimized solar thermal collector structure using a lightweight collector structure capable of lowering structural costs, simplifying installation, and leading to mass-manufacturability. Approach The JPL project seeks to achieve the SunShot Initiative installed cost target of $75/m2 for a solar thermal collector system, as well as SunShot performance targets for optical errors, operations during windy conditions, and lifetime.

256

Maryland Small Business Helping Lower Solar Costs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maryland Small Business Helping Lower Solar Costs Maryland Small Business Helping Lower Solar Costs Maryland Small Business Helping Lower Solar Costs January 12, 2010 - 9:14am Addthis Joshua DeLung One potential problem with going solar across America is that the up-front costs of installing solar panels are often too high for the average consumer. Though panels can produce mounds of energy savings over a long period of time, the expense of installation is still too high for many. However, stimulus funding awarded to a small, Maryland-based business with six employees - AccuStrata Inc. - by the U.S. Department of Energy under the Recovery Act is helping the company develop technology to eliminate such barriers. AccuStrata was awarded its third Small Business Innovation Research grant of $150,000 in December. These grants will help the company increase the

257

Maryland Small Business Helping Lower Solar Costs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Small Business Helping Lower Solar Costs Small Business Helping Lower Solar Costs Maryland Small Business Helping Lower Solar Costs January 12, 2010 - 9:14am Addthis Joshua DeLung One potential problem with going solar across America is that the up-front costs of installing solar panels are often too high for the average consumer. Though panels can produce mounds of energy savings over a long period of time, the expense of installation is still too high for many. However, stimulus funding awarded to a small, Maryland-based business with six employees - AccuStrata Inc. - by the U.S. Department of Energy under the Recovery Act is helping the company develop technology to eliminate such barriers. AccuStrata was awarded its third Small Business Innovation Research grant of $150,000 in December. These grants will help the company increase the

258

Methods | Transparent Cost Database  

Open Energy Info (EERE)

information NREL has developed the following cost of energy tools: System Advisor Model (SAM): https:sam.nrel.gov SAM makes performance predictions and cost of...

259

Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering?  

Office of Energy Efficiency and Renewable Energy (EERE)

What energy savings are realistically achievable by following quality installation standards for installation, operation, and maintenance of residential HVAC?

260

Highly Insulating Windows - Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost Cost The following is an estimate of the cost effective incremental cost of highly-insulating windows (U-factor=0.20 Btu/hr-ft2-F) compared to regular ENERGY STAR windows (U-factor 0.35 Btu/hr-ft2-F). Energy savings from lower U-factors were simulated with RESFEN over an assumed useful window life of 25 years. To determine the maximum incremental cost at which highly-insulating windows would still be cost-effective, we used a formula used by many utility companies to calculate the cost of saved energy from energy efficiency programs, based on the programs' cost and savings. We turned this formula around so that the cost of saved energy equals the present energy prices in the studied locations, whereas the program cost (the incremental cost of the windows) is the dependent variable. By entering 5%

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Wall Sculpture by Ellsworth Kelly Installed on Dartmouth Campus  

E-Print Network [OSTI]

Wall Sculpture by Ellsworth Kelly Installed on Dartmouth Campus Dartmouth Panels will be dedicated District, a wall sculpture by renowned abstract artist Ellsworth Kelly has been installed on the eastern façade of the Hopkins Center for the Arts, facing the Visual Arts Center. Kelly was in attendance

Shepherd, Simon

262

Net Zero Energy Military Installations: A Guide to  

E-Print Network [OSTI]

Net Zero Energy Military Installations: A Guide to Assessment and Planning Samuel Booth, John;Technical Report Net Zero Energy Military NREL/TP-7A2-48876 Installations: A Guide to August 2010 Assessment .......................................................................................................................................1 1 Introduction: Net Zero Energy In DoD Context

263

Study Guide for Photovoltaic System Installers and Sample Examination Questions  

Broader source: Energy.gov [DOE]

This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help better prepare for the NABCEP PV installer examination but does not provide all of the information needed for completing the certification examination.

264

SynFlo: an interactive installation introducing synthetic biology concepts  

Science Journals Connector (OSTI)

SynFlo is an interactive installation that utilizes tangible interaction to help illustrate core concepts of synthetic biology through outreach programs. This playful installation allows users to create useful virtual life forms from standardized genetic ... Keywords: E. chromi, microsoft surface, sifteo cubes, synthetic biology, tangible user interfaces

Kimberly Chang; Wendy Xu; Nicole Francisco; Consuelo Valdes; Robert Kincaid; Orit Shaer

2012-11-01T23:59:59.000Z

265

Targeting Net Zero Energy for Military Installations (Presentation)  

SciTech Connect (OSTI)

Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Burman, K.

2012-05-01T23:59:59.000Z

266

Lessons Learned During HVAC Installation Dept. of Computer Science  

E-Print Network [OSTI]

Lessons Learned During HVAC Installation Ian Watson AI-CBR Dept. of Computer Science University of HVAC equipment. It has been developed as an adjunct to an existing system that uses case-based reasoning to reuse previous HVAC installation specifications and designs. The system described lets

Watson, Ian

267

Low-Cost, Lightweight Solar Concentrators  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Concentrators Concentrators California Institute of Technology/Jet Propulsion Laboratory Award Number:0595-1612 | January 15, 2013 | Ganapathi Thin Film mirror is ~40-50% cheaper and 60% lighter than SOA * Project leverages extensive space experience by JPL and L'Garde to develop a low-cost parabolic dish capable of providing 4 kW thermal. Key features: * Metallized reflective thin film material with high reflectivity (>93%) with polyurethane foam backing * Single mold polyurethane backing fabrication enables low cost high production manufacturing * Ease of panel installation and removal enables repairs and results in a low total life cycle cost * Deployment of multiple dishes enhances system level optimizations by simulating larger fields which addresses issues like shared resources

268

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: Energy.gov (indexed) [DOE]

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

269

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations |  

Broader source: Energy.gov (indexed) [DOE]

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations April 17, 2012 - 3:09pm Addthis On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters. For the event, Congresswoman Doris Matsui (D-Sacramento) visited SMUD's customer service center and praised the program for implementing a system "that will be more efficient, more reliable, and better for consumers." SMUD's meter installations are nearly complete, with only a few thousand remaining. In addition to smart meters, SMUD's grid modernization efforts will include automated distribution systems, a

270

Solar, Wind, Hydropower: Home Renewable Energy Installations | Department  

Broader source: Energy.gov (indexed) [DOE]

Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. Homeowner Andrea Mitchel, with installer Joe Guasti, proudly shows off small wind turbine installed in Oak Hills, CA. | Photo by Karin Sinclair, National Renewable Energy Laboratory.

271

V-053: Adobe Shockwave player installs Xtras without prompting | Department  

Broader source: Energy.gov (indexed) [DOE]

3: Adobe Shockwave player installs Xtras without prompting 3: Adobe Shockwave player installs Xtras without prompting V-053: Adobe Shockwave player installs Xtras without prompting December 24, 2012 - 12:15am Addthis PROBLEM: Adobe Shockwave player installs Xtras without prompting PLATFORM: Adobe Shockwave Player ABSTRACT: A vulnerability was reported in Adobe Shockwave. REFERENCE LINKS: Vulnerability Note VU#519137 SecurityTracker Alert ID: 1027903 Bugtraq ID: 56972 CVE-2012-6271 IMPACT ASSESSMENT: Medium DISCUSSION: Adobe Shockwave Player through 11.6.8.638 allows remote attackers to trigger installation of arbitrary signed Xtras via a Shockwave movie that contains an Xtra URL, as demonstrated by a URL for an outdated Xtra. IMPACT: By convincing a user to view a specially crafted Shockwave content, an attacker may be able to execute arbitrary code with the privileges of the

272

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be

273

Tracking the Sun VII: An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2013  

SciTech Connect (OSTI)

As the deployment of grid-connected solar photovoltaic (PV) systems has increased, so too has the desire to track the cost and price of these systems. This report helps to fill this need by summarizing trends in the installed price of grid-connected PV systems in the United States from 1998 through 2013, with partial data for the first half of 2014. The analysis is based on project-level data for more than 300,000 individual residential, commercial, and utility-scale PV systems installed across 33 states and representing 80% of all grid-connected PV capacity installed in the United States through 2013. It is essential to note at the outset what the data presented within this report represent. First, the data consist of prices paid to project developers or installers (prior to receipt of any incentives), and for a variety of reasons, those prices may differ from the underlying costs borne by project developers/installers. Second, the data are historical, focusing primarily on projects installed through the end of 2013, and therefore do not reflect the price of projects installed more recently (with the exception of the limited set of results presented for systems installed in the first half of 2014); nor are the data indicative of prices currently being quoted for prospective projects to be installed at a later date. For these reasons and others, the results presented in this report may differ from current PV price or cost benchmarks. Third, by focusing on the up-front price paid by the PV system owner prior, the report does not capture trends associated with PV performance or other factors that impact the levelized cost of electricity for PV. Finally, the underlying data collected for this report include third party owned (TPO) projects where either the system is leased to the site-host or the generation output is sold to the site-host under a power purchase agreement. For a subset of TPO systems, the installed price data represent appraised values rather than transaction prices, and those projects were removed from the data sample in order to eliminate any associated bias. The report presents one set of installed price trends for residential and commercial PV systems, and another set for utility-scale PV. In all cases, installed prices are identified in terms of real 2013 dollars per installed watt (DC-STC), prior to receipt of any direct financial incentives or tax credits. This report separately summarizes installed price data for utility-scale PV projects, drawing upon data also presented in LBNLs companion report, Utility Scale Solar 2013: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States. For our purposes, utility-scale PV is defined to consist of ground-mounted projects larger than 5 MW. The sample of installed price data includes 97 projects with commercial operation dates spanning the period 2007- 2013. Several important features of the utility-scale data are worth noting, in addition to those noted earlier for the dataset as a whole. First, the sample includes only fully operational projects for which all individual phases are in operation and treats all phases as a single project with a commercial operation date based on the final phase. Second, installed prices reported for utility-scale projects often reflect transactions that occurred several years before project completion; the prices reported for some of these projects may not fully capture recent reductions in module costs or other changes in market conditions, and thus may exhibit a relatively large temporal lag.

Barbose, Galen; Weaver, Samantha; Darghouth, Naim

2014-08-26T23:59:59.000Z

274

Effects of installing economizers in boilers used in space heating applications  

SciTech Connect (OSTI)

This paper discusses how the performance of a boiler can be improved by adding an economizer to preheat the boiler's feedwater. An energy analysis was applied to a boiler and then to both a boiler and an economizer (water pre-heater) to evaluate the benefits of heat recovery. Exergy rates calculated for both the boiler and the economizer determined that the temperature of the stack gases had primary effects on the performance of a boiler. The results from this study showed that 57% of the heat rejected at the boiler's stack could be recovered by installing an economizer to preheat the feedwater. As a result, the average cost savings that would be realized for a 36,400 kg/h (80,000 lbm/h) boiler averages US$8 per hour. The cost savings to steam production averaged US$0.20 per 455 kg (1,000 lbm) of steam and the ration between the cost savings to stack temperature averaged $0.02 per C (1.8 F). For this case, the fuel and the cost savings realized from using an economizer were averaged at 3.8% and 3.7%, respectively. These results translated to total cost savings, for an eight-day period considered, of US$940.

Gonzalez, M.A.; Medina, M.A.; Schruben, D.L.

1999-07-01T23:59:59.000Z

275

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

276

Solar panels are cost intensive, have limitations with respect to  

E-Print Network [OSTI]

advantage of being able to convert sunlight into clean energy. After the glass is coated, we install clean electricity. Advantages · Building-integratable. · Contributes to EU targets towards energySolar panels are cost intensive, have limitations with respect to where they can be integrated

Langendoen, Koen

277

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

278

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

279

A chronicle of costs  

SciTech Connect (OSTI)

This report contains the history of all estimated costs associated with the superconducting super collider.

Elioff, T.

1994-04-01T23:59:59.000Z

280

Southern CA Area | Open Energy Information  

Open Energy Info (EERE)

Southern CA Area Southern CA Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Southern CA Area 1.1 Products and Services in the Southern CA Area 1.2 Research and Development Institutions in the Southern CA Area 1.3 Networking Organizations in the Southern CA Area 1.4 Investors and Financial Organizations in the Southern CA Area 1.5 Policy Organizations in the Southern CA Area Clean Energy Clusters in the Southern CA Area Products and Services in the Southern CA Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Non-Hardware ("Soft") Cost-Reduction Roadmap for Residential and Small Commercial Solar Photovoltaics, 2013-2020  

SciTech Connect (OSTI)

The objective of this analysis is to roadmap the cost reductions and innovations necessary to achieve the U.S. Department of Energy (DOE) SunShot Initiative's total soft-cost targets by 2020. The roadmap focuses on advances in four soft-cost areas: (1) customer acquisition; (2) permitting, inspection, and interconnection (PII); (3) installation labor; and (4) financing. Financing cost reductions are in terms of the weighted average cost of capital (WACC) for financing PV system installations, with real-percent targets of 3.0% (residential) and 3.4% (commercial).

Ardani, K.; Seif, D.; Margolis, R.; Morris, J.; Davidson, C.; Truitt, S.; Torbert, R.

2013-08-01T23:59:59.000Z

282

Early Station Costs Questionnaire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

283

Low Cost, Durable Seal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost, Durable Seal Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability Transportation: 5,000 hr Stationary: 40,000 hr Durability Improve mechanical and chemical stability to achieve 40,000 hr of useful operating life. Low Cost Low Cost A material cost equivalent to or less than the cost of silicones in common use. 3 LOW COST, DURABLE SEAL

284

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up AmaSeis  

E-Print Network [OSTI]

Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up Ama the Arduino drivers. Take note of the assigned com port number, and set up AmaSeis to that number. 3. Some computers will require the following. Keep in mind, Arduino, does not need to run or be involved. You just

Barrash, Warren

285

Permitting Best Practices Make Installing Solar Easier: Technical Assistance (Fact Sheet), NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NREL staff NREL staff can help states and local jurisdictions assess permitting processes, standardization approaches across a region, and permit fee options. t e c h n i c a l a s s i s ta n c e Permitting Best Practices Make Installing Solar Easier Common-Sense Improvements Address Top-Three Permitting Issues The U.S. solar industry has reached a turning point. While photovoltaic (PV) hardware costs exhibit rapid decline, non-hardware balance of system (BOS) costs such as permitting and inspection have remained relatively constant. The United States comprises more than 18,000 local jurisdictions whose permitting requirements and fees vary widely. The lack of permitting standardization across jurisdictions and inefficient permitting processes create challenges

286

Solar hot water system installed at Mobile, Alabama. Final report  

SciTech Connect (OSTI)

This final report describes the solar energy hot water system installed at LaQuinta Motor Inn Inc., at Mobile, Alabama. The building is a 122 unit motel. The system consists of six rows of ten collectors and three rows of eleven collectors (1990 square feet) mounted on the roof. Griswald flow control valves were installed to regulate the flow to each row. Two Heliotrope electronic thermometers with a combined capability of measuring the temperatures of 22 different locations were installed for monitoring purposes. Engineering drawings, component specifications, and operator instructions are included.

None

1980-10-01T23:59:59.000Z

287

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Wiser, Ryan

2014-01-01T23:59:59.000Z

288

Operations Cost Allocation Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

289

Legislative Findings: Least-Cost Energy Sources (Nebraska) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Legislative Findings: Least-Cost Energy Sources (Nebraska) Legislative Findings: Least-Cost Energy Sources (Nebraska) Legislative Findings: Least-Cost Energy Sources (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Nebraska Public Power District

290

Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical...  

Broader source: Energy.gov (indexed) [DOE]

Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company:...

291

Wind Forecast Improvement Project Southern Study Area Final Report...  

Office of Environmental Management (EM)

Wind Forecast Improvement Project Southern Study Area Final Report Wind Forecast Improvement Project Southern Study Area Final Report Wind Forecast Improvement Project Southern...

292

Bibliography and Literature Database, Ecology of the Southern California Bight  

E-Print Network [OSTI]

from Tanner Basin, Southern California Bight / Simoneit-and basin macrofaunal communities of the Southern California Bight.two basins in the Southern California Bight / Venkatesan,

Allen, L

1989-01-01T23:59:59.000Z

293

Energy Secretary Chu Announces Five Million Smart Meters Installed  

Broader source: Energy.gov (indexed) [DOE]

Announces Five Million Smart Meters Installed Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort June 13, 2011 - 12:00am Addthis Washington, DC - At a White House Grid Modernization event today, U.S. Department of Energy Secretary Steven Chu announced that more than five million smart meters have been installed nationwide as part of Recovery Act-funded efforts to accelerate modernization of the Nation's electric grid. Smart meters will provide utility companies with greater information about how much electricity is being used throughout their service areas. They will also give consumers access to real-time information about their energy consumption, allowing them to make well-informed decisions about how

294

Newly Installed Alaska North Slope Well Will Test Innovative Hydrate  

Broader source: Energy.gov (indexed) [DOE]

Newly Installed Alaska North Slope Well Will Test Innovative Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies Newly Installed Alaska North Slope Well Will Test Innovative Hydrate Production Technologies May 17, 2011 - 1:00pm Addthis Washington, DC - A fully instrumented well that will test innovative technologies for producing methane gas from hydrate deposits has been safely installed on the North Slope of Alaska. As a result, the "Iġnik Sikumi" (Iñupiaq for "fire in the ice") gas hydrate field trial well will be available for field experiments as early as winter 2011-12. The well, the result of a partnership between ConocoPhillips and the Office of Fossil Energy's (FE) National Energy Technology Laboratory, will test a technology that involves injecting carbon dioxide (CO2) into sandstone

295

Property:Project Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Installed Capacity (MW) Installed Capacity (MW) Jump to: navigation, search Property Name Project Installed Capacity (MW) Property Type String Pages using the property "Project Installed Capacity (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 0 + MHK Projects/ADM 5 + 1 + MHK Projects/AWS II + 1 + MHK Projects/Admirality Inlet Tidal Energy Project + 22 + MHK Projects/Agucadoura + 2 + MHK Projects/Alaska 18 + 10 + MHK Projects/Alaska 36 + 10 + MHK Projects/Algiers Cutoff Project + 16 + MHK Projects/Algiers Light Project + 0 + MHK Projects/Anconia Point Project + 0 + MHK Projects/Ashley Point Project + 0 + MHK Projects/Astoria Tidal Energy + 300 + MHK Projects/Avondale Bend Project + 0 + MHK Projects/Bar Field Bend + 0 +

296

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

297

Home Solar Installations: Things to Consider | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

298

Property:EZFeed/InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name EZFeed/InstalledCapacity Property Type String Description EZFeed Installed Capacity property Subproperties This property has the following 6079 subproperties: 2 2003 Climate Change Fuel Cell Buy-Down Program (Federal) 3 30% Business Tax Credit for Solar (Vermont) 4 401 Certification (Vermont) A AEP (Central and North) - CitySmart Program (Texas) AEP (Central and North) - Residential Energy Efficiency Programs (Texas) AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) AEP Appalachian Power - Residential Home Retrofit Program (West Virginia)

299

Oklahoma Tribe to Install Solar Roof | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof Oklahoma Tribe to Install Solar Roof March 22, 2010 - 6:10pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this project do? The new fully functioning roof and solar energy production plant will save the tribe about $20,000 a year. The Delaware Nation, a federally-recognized tribe of about 1,400 people in Anadarko, Okla., will install solar panel roofs on two tribal government buildings as part of a larger effort to become more sustainable and bring new jobs to an area struggling with high unemployment. "It's the start of a green initiative," says Theda McPheron-Keel, president of Wind Hollow Foundation, a nonprofit organization aimed at helping American Indians improve their lives. "It provides economic

300

Carpe Diem: Install Insulated Roman Shades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades Carpe Diem: Install Insulated Roman Shades March 16, 2010 - 11:44am Addthis John Lippert As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows. I should have bought window quilts for all of our windows, but I refrained from doing so on two downstairs windows to save money (which, in the long run, I didn't). There were window shades already there; they didn't do much from a thermal perspective, but they did provide privacy and room darkening. Well, they need to be replaced now, and I'm looking again at high efficiency thermal window shades. This time I'm considering thermal Roman shades. About a dozen years ago my wife and I went on the Tour of Solar Homes, the local component of the annual National Solar Tour sponsored by the American

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Home Solar Installations: Things to Consider | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider Home Solar Installations: Things to Consider May 29, 2013 - 3:18pm Addthis Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Home solar systems can save you energy and money. | Photo courtesy of Dennis Schroeder, NREL 22168. Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Read these considerations for installing a home solar electric system to evaluate whether it is a good choice for your home. Well, it's that time of year! Days are getting longer and the weather is getting warmer. How can you take advantage of longer sunlight hours? Dinner on your porch might be one good solution, but an even better one might be

302

Defense Energy Support Center: Installation Energy Commodity Business Unit  

Broader source: Energy.gov [DOE]

Presentationgiven at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the Defense Energy Support Center's (DESC's) Installation Energy Commodity Business Unit (CBU) including its intent, commitment, pilot project, lessons learned, and impending barriers.

303

Microsoft Word - LSN_FiberInstall_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

- TEP-TPP-4 Proposed Action: Lightspeed Network's Fiber Installation near Pilot Butte Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber...

304

Installing a Subsurface Drip Irrigation System for Row Crops  

E-Print Network [OSTI]

This publication describes the components of a subsurface drip irrigation system and the procedure for installing such a system. Each step is outlined and illustrated. Steps include tape injection, trenching, connecting drip lines, back-filling...

Enciso, Juan

2004-09-07T23:59:59.000Z

305

Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry  

E-Print Network [OSTI]

This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex...

Weaver, Timothy A.

2010-07-14T23:59:59.000Z

306

North Shore Gas Single Family Direct Install (Illinois)  

Broader source: Energy.gov [DOE]

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

307

Construction and installation of public comfort art : "Art as sanctuary"  

E-Print Network [OSTI]

This paper illustrates the construction and installation of a public piece of art, hidden within which is an enclosed and private meditation space. In making the piece, the artist was influenced by the works of others as ...

Longo, Sheila A. (Sheila Ann)

2005-01-01T23:59:59.000Z

308

Gamesa Installs 2-MW Wind Turbine at NWTC  

Broader source: Energy.gov [DOE]

In October, the Department of Energy (DOE) National Renewable Laboratory (NREL) worked with Gamesa Wind US to complete the installation of Gamesa's G97-2 MW Class IIIA turbine at NREL's National Wind Technology Center.

309

Capturing and Applying Lessons Learned During Engineering Equipment Installation  

Science Journals Connector (OSTI)

This paper describes the implementation of a knowledge management tool to capture and reuse the lessons learned from the installation of engineering equipment. It has been developed as an adjunct to an existin...

Ian Watson

2004-01-01T23:59:59.000Z

310

Capturing and Applying Lessons Learned During Engineering Equipment Installation  

Science Journals Connector (OSTI)

This paper describes the implementation of a knowledge management tool to capture and reuse the lessons learned from the installation of engineering equipment. It has been developed as an adjunct to an exist-i...

Ian Watson

2004-01-01T23:59:59.000Z

311

Consider Installing a Condensing Economizer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

a Condensing Economizer Consider Installing a Condensing Economizer This tip sheet summarizes the benefits of condensing economizers and is part of a series of tip sheets on how to...

312

Design and Installation of a Disposal Cell Cover Field Test ...  

Broader source: Energy.gov (indexed) [DOE]

through March 3, 2011, Phoenix, Arizona. C.H. Benson, W.J. Waugh, W.H. Albright, G.M. Smith, R.P. Bush Design and Installation of a Disposal Cell Cover Field Test More Documents...

313

Vet's company installing solar across Massachusetts | Department of  

Broader source: Energy.gov (indexed) [DOE]

Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts Vet's company installing solar across Massachusetts February 25, 2010 - 4:09pm Addthis Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010. The small company recently reached a significant milestone - it was awarded one of the largest solar contracts in Massachusetts. Dan served in the military for seven years, reaching the rank of captain in the Army. He says his idea for a clean energy company came in 2005 when he was pursuing his M.B.A while serving in Kuwait. "For my final project, I wrote a business plan for a clean energy

314

Net Zero Energy Military Installations: A Guide to Assessment...  

Broader source: Energy.gov (indexed) [DOE]

joint initiative to address military energy use by identifying specific actions to reduce energy demand and increase use of renewable energy on DoD installations. 48876.pdf More...

315

Predicting the energy use and operation cost of HVAC air filters  

Science Journals Connector (OSTI)

A model has been developed to predict the energy efficiency and annual operation cost for filters installed in an HVAC air handling system using filter data from standard ASHRAE 52.2-2007 filter tests. Thirty filters from six manufacturers were investigated to determine the most energy efficient and cost effective filtration solutions for an airport installation in Vancouver, Canada. A comparison of the output of the proposed model with the kep and Wattage methods was performed to highlight the possible differences in filter choice that would be made using alternative approaches. The outcomes have been shown to differ due to data not incorporated in the older models such as filtration efficiency and particulate concentration. The sensitivity of filter cost to model parameters was also studied. It was found that the concentration of particles in the air stream and the cost of electricity had the largest effect on annual cost of operation. Increasing the concentration of particles in the air stream increases the cost of operating the filter and causes the installation of a prefilter upstream of the primary filter to be more economically attractive. Increasing electricity cost also increases the operation cost but has the reverse effect on attractiveness of prefilter installations.

James F. Montgomery; Sheldon I. Green; Steven N. Rogak; Karen Bartlett

2012-01-01T23:59:59.000Z

316

Do feed-in tariffs drive PV cost or viceversa?  

Science Journals Connector (OSTI)

Abstract A survey of the PV market in Italy was done studying a number of installations of different sizes whose economic data were known and assessed. The Italian market has experienced a boom in the PV market after the first mechanism of feed-in tariffs was promoted in 2005. The variations of the tariff structure in the following years have caused significant changes in the market structure in terms of average size and technical characteristics of installed plants. However, an Italian PV industry was not stimulated by the incentives and only companies involved in installation and maintenance were created. At the same time, the cost of the PV plants components, design and commissioning have followed quite a particular trend, which is more determined by the tariffs than by the market development and structure. It is quite clear that the costs of PV plants component are not driven by the amount of installations but by the tariffs, with a trend that follows the decreases in the incentives and not the global installed power. It is therefore very important to study the right tariff mechanisms and benefits to avoid financial disturbances on the market and to promote a real competitive market instead of a simple financial operation under a fake faade of green economy.

Marco Antonelli; Umberto Desideri

2014-01-01T23:59:59.000Z

317

Installation of a high-precision Kirsten Hacker  

E-Print Network [OSTI]

Installation of a high-precision BPM in BC3 Kirsten Hacker 20-03-07 #12;BPM installed in BC2=T3*c dE/E=D/R16 EBPM T1 T2 T3 ~300mm 3um position resolution -> 1e-5 Energy resoution!!! BPM BPM #12;BPM for the Bunch Compressors beam stripline vacuumstripline vacuumStripline Vacuum Beam beam tapering

318

Hydrogen Threshold Cost Calculation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Record (Offices of Fuel Cell Technologies) Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing vehicles [gasoline in hybrid-electric vehicles (HEVs)] in 2020. This record documents the methodology and assumptions used to calculate that threshold cost. Principles: The cost threshold analysis is a "top-down" analysis of the cost at which hydrogen would be

319

Hydrogen Pathway Cost Distributions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pathway Cost Distributions Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric hybrids are benchmarks * R&D guidance provided in two forms * Evolved gasoline ICE defines a threshold hydrogen cost used to screen or eliminate options which can't show ability to meet target * Gasoline-electric hybrid defines a lower hydrogen cost used to prioritize projects for resource allocation

320

Cost-Benefit Analysis  

Science Journals Connector (OSTI)

Acost-benefit analysis is an analytical procedure for determining the economic efficiency of intervention, expressed as the relationship between costs and outcomes, usually measured in monetary terms. In othe...

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Cost-Efficiency  

Science Journals Connector (OSTI)

Cost?efficiency is agoal that has been integrated by policy makers into all modern health care systems to control the expansion of costs over time. It relates to maximizing the quality of acomparable unit ...

2008-01-01T23:59:59.000Z

322

About Cost Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from the university, fee-for-service contracts, as well as establishing CAMD as a cost center. We know that our users are reluctant to see CAMD become a cost center, however...

323

Costs of Electricity  

Science Journals Connector (OSTI)

A major reason for the decreased interest in the building of new nuclear power plants in recent years has been the relatively high cost of nuclear power. In this section, we will consider the role of costs in electricity

2005-01-01T23:59:59.000Z

324

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

325

Cost Optimal Energy Performance  

Science Journals Connector (OSTI)

EPBD recast requires Member States (MS) to ensure that minimum energy performance requirements of buildings are set with a view to achieving cost optimal levels using a comparative methodology framework...1]. Cost

Jarek Kurnitski

2013-01-01T23:59:59.000Z

326

Cost Containment and Productivity  

E-Print Network [OSTI]

Cost Containment and Productivity Faculty Assembly Presentation January 22, 2013 Arthur G. Ramicone, CFO David N. DeJong, Vice Provost, Academic Planning and Resources Management #12;Cost Containment Resources to Enhance the Student Experience · Reduce the Cost and Complexity of Administrative Operations

Jiang, Huiqiang

327

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

328

Lunch & Learn Cost Sharing  

E-Print Network [OSTI]

Lunch & Learn Cost Sharing #12;Today's Agenda Policy Procedures OMNI Child Budget Setup Transactions in OMNI FACET Common Issues #12;Cost Sharing Policy http://www.research.fsu.edu/contractsgra nts ­ Not quantified ­ Do not have to account for and report #12;Cost Sharing Procedures http

McQuade, D. Tyler

329

Low-Cost Spectral Sensor Development Description.  

SciTech Connect (OSTI)

Solar spectral data for all parts of the US is limited due in part to the high cost of commercial spectrometers. Solar spectral information is necessary for accurate photovoltaic (PV) performance forecasting, especially for large utility-scale PV installations. A low-cost solar spectral sensor would address the obstacles and needs. In this report, a novel low-cost, discrete- band sensor device, comprised of five narrow-band sensors, is described. The hardware is comprised of commercial-off-the-shelf components to keep the cost low. Data processing algorithms were developed and are being refined for robustness. PV module short-circuit current ( I sc ) prediction methods were developed based on interaction-terms regression methodology and spectrum reconstruction methodology for computing I sc . The results suggest the computed spectrum using the reconstruction method agreed well with the measured spectrum from the wide-band spectrometer (RMS error of 38.2 W/m 2 -nm). Further analysis of computed I sc found a close correspondence of 0.05 A RMS error. The goal is for ubiquitous adoption of the low-cost spectral sensor in solar PV and other applications such as weather forecasting.

Armijo, Kenneth Miguel; Yellowhair, Julius

2014-11-01T23:59:59.000Z

330

Implementation of the Southern Company clean air compliance strategy  

SciTech Connect (OSTI)

The Clean Air Act with the 1990 Amendments is one of the most complex environmental laws to be enacted by Congress. It mandates a vast array of changes that have significantly increased the magnitude and complexity of clean air compliance for sources of air emissions, including coal-fired electric utilities across the US. The Southern Company was involved in the development of the amendments and recognized the necessity, even prior to the November 15, 1990, enactment, for an integrated clean air compliance strategy in order to be able to successfully implement the strategy within a relatively tight compliance timetable. The principle requirements of the amendments that currently affect coal-fired generating plants, and the primary focus of the strategy development and implementation process for The Southern Company, are found in Title IV--Acid Deposition Control. While Title IV contains elements of the traditional command and control approach to regulating nitrogen oxides (NO{sub x}) emissions and emissions monitoring, this title introduces an innovative market-based allowance system approach to regulating sulfur dioxide (SO{sub 2}) emissions. The development of the strategy and its implementation considered other final requirements of the 1990 Amendments, to the extent possible, as well as potential future environmental requirements. The weighing of the various compliance alternatives to develop a cost-effective strategy became and continues to be a major challenge for The Southern Company and other electric utilities. Within The Southern Company, a multidisciplined project team and numerous task forces have continued to review the strategy and its implementation against changes in a number of key drivers including fuel prices, technology costs, expected allowance values, and regulatory developments. This approach provides the flexibility to match a dynamic environment with the appropriate compliance alternatives.

Boyd, K.; Herrin, W.D. [Southern Company Services, Birmingham, AL (United States)

1995-12-31T23:59:59.000Z

331

Cost Function Estimates  

Science Journals Connector (OSTI)

Abstract The cost function describes the cost-minimizing combinations of inputs required for production of different levels of output. Empirical cost function studies take both short-run and long-run approaches and can be structurally consistent with microeconomic theory versus more behavioral or real-world data oriented. Studies of health care providers face numerous challenges including the multiproduct nature of the firm, difficulty in controlling for quality of service, and frequent failure of the profit-maximization assumption. Cost function applications in health care are numerous and include such topics as optimal firm size, performance inefficiency measures, and comparisons of production costs with third-party payments.

K. Carey

2014-01-01T23:59:59.000Z

332

Estimating the Cost and Energy Efficiency of a Solar Water Heater |  

Broader source: Energy.gov (indexed) [DOE]

Estimating the Cost and Energy Efficiency of a Solar Water Heater Estimating the Cost and Energy Efficiency of a Solar Water Heater Estimating the Cost and Energy Efficiency of a Solar Water Heater May 30, 2012 - 3:09pm Addthis Solar water heaters are more efficient the gas or electric heaters. | Chart credit ENERGY STAR Solar water heaters are more efficient the gas or electric heaters. | Chart credit ENERGY STAR What does this mean for me? Solar water heaters cost more to purchase and install but may save you money in the long run. Estimate the annual operating costs and compare several solar water heaters to determine whether it is worth investing in a more efficient system. Solar water heating systems usually cost more to purchase and install than conventional water heating systems. However, a solar water heater can

333

Energy Department Announces $7 Million to Reduce Non-Hardware Costs of  

Broader source: Energy.gov (indexed) [DOE]

7 Million to Reduce Non-Hardware Costs 7 Million to Reduce Non-Hardware Costs of Solar Energy Systems Energy Department Announces $7 Million to Reduce Non-Hardware Costs of Solar Energy Systems November 15, 2011 - 4:52pm Addthis Washington, D.C. - As part of the U.S. Department of Energy's SunShot Initiative, Energy Secretary Steven Chu today announced up to $7 million to reduce the non-hardware costs of residential and commercial solar energy installations. Made available through the SunShot Incubator Program, this funding will support the development of tools and approaches that reduce non-hardware, or "soft" costs, such as installation, permitting, interconnection, and inspection. These expenses can amount to up to half of the cost of residential systems. The Incubator will make the process of

334

Estimating the Cost and Energy Efficiency of a Solar Water Heater |  

Broader source: Energy.gov (indexed) [DOE]

Estimating the Cost and Energy Efficiency of a Solar Water Heater Estimating the Cost and Energy Efficiency of a Solar Water Heater Estimating the Cost and Energy Efficiency of a Solar Water Heater May 30, 2012 - 3:09pm Addthis Solar water heaters are more efficient the gas or electric heaters. | Chart credit ENERGY STAR Solar water heaters are more efficient the gas or electric heaters. | Chart credit ENERGY STAR What does this mean for me? Solar water heaters cost more to purchase and install but may save you money in the long run. Estimate the annual operating costs and compare several solar water heaters to determine whether it is worth investing in a more efficient system. Solar water heating systems usually cost more to purchase and install than conventional water heating systems. However, a solar water heater can

335

MARKETING GRADUATE ASSISTANT Georgia Southern University  

E-Print Network [OSTI]

MARKETING GRADUATE ASSISTANT Georgia Southern University Department of University Housing Job Analysis General Description: The Marketing Graduate Assistant is a University Housing staff member who is enrolled in a Georgia Southern University graduate program. The Marketing Graduate Assistant provides vital

Hutcheon, James M.

336

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

337

Cost Model for Digital Curation: Cost of Digital Migration  

E-Print Network [OSTI]

Steece, B. 2000. Software cost estimation with COCOMO II.Developing a Framework of Cost Elements for PreservingAshley, K. 1999. Digital archive costs: Facts and fallacies.

Kejser, Ulla Bgvad; Nielsen, Anders Bo; Thirifays, Alex

2009-01-01T23:59:59.000Z

338

DOE Solar Decathlon: 2009 Solar Decathlon House Construction Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

safety gear on the roof of a house. Above him is a large photovoltaic panel. safety gear on the roof of a house. Above him is a large photovoltaic panel. A member of Team Spain installs a portion of his house's roof during Solar Decathlon 2009. Solar Decathlon 2009 Solar Decathlon House Construction Costs The construction costs of the U.S. Department of Energy Solar Decathlon 2009 team houses varied widely based on the technologies employed and the target market for which they were designed. In general, however, construction costs ranged from about $200,000 to more than $800,000. But it is important to remember that these houses were one-of-a-kind designs that incorporated bleeding-edge technologies. If they were to be mass-produced, as most residential homes are, their overall costs would likely decrease significantly. Specific construction cost ranges for each house as well as information

339

Low Cost Heliostat Development Phase II Final Report  

SciTech Connect (OSTI)

The heliostat field in a central receiver plant makes up roughly one half of the total plant cost. As such, cost reductions for the installed heliostat price greatly impact the overall plant cost and hence the plants Levelized Cost of Energy. The general trend in heliostat size over the past decades has been to make them larger. One part of our thesis has been that larger and larger heliostats may drive the LCOE up instead of down due to the very nature of the precise aiming and wind-load requirements for typical heliostats. In other words, it requires more and more structure to precisely aim the sunlight at the receiver as one increases heliostat mirror area and that it becomes counter-productive, cost-wise, at some point.

Kusek, Stephen M.

2014-04-21T23:59:59.000Z

340

Annual variation in primary moult parameters in Cape Weavers, Southern Masked Weavers and Southern Red  

E-Print Network [OSTI]

and Southern Red Bishops in the Western Cape, South Africa #12;160 #12;161 Annual variation in primary moult parameters in Cape Weavers, Southern Masked Weavers and Southern Red Bishops in the Western Cape, South Africa Abstract Duration of primary moult was similar in Cape Weavers and Southern Red Bishops (96 days

de Villiers, Marienne

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Crustal Spreading in Southern California  

Science Journals Connector (OSTI)

...Thermal effects in the Buttes geothermal area at the southern end of...convection, a range of linear geothermal gradients is shown, for different...have propagated north A A' HEATING RISING GEOTHERMS 3 BASALT...Im-perial fault at the Brawley geothermal anomaly and at the Buttes...

Wilfred A. Elders; Robert W. Rex; Paul T. Robinson; Shawn Biehler; Tsvi Meidav

1972-10-06T23:59:59.000Z

342

Simulation of Recent Southern Hemisphere Climate Change  

E-Print Network [OSTI]

Simulation of Recent Southern Hemisphere Climate Change Nathan P. Gillett1 * and David W. J. Thompson2 Recent observations indicate that climate change over the high latitudes of the Southern's surface as well. Recent climate change in the Southern Hemi- sphere (SH) is marked by a strengthening

343

New England Breeze Solar and Wind Installers | Open Energy Information  

Open Energy Info (EERE)

Breeze Solar and Wind Installers Breeze Solar and Wind Installers Jump to: navigation, search Logo: New England Breeze Solar and Wind Installers Name New England Breeze Solar and Wind Installers Place Hudson, Massachusetts Zip 01749 Sector Renewable energy, Services, Solar, Wind energy Product Solar Panel and Wind Turbine Installation Year founded 2006 Number of employees 1-10 Phone number 978-567-9463 Website http://www.NewEnglandBreeze.co Coordinates 42.3917598°, -71.5661769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.3917598,"lon":-71.5661769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

344

Stakeholder Engagement and Outreach: U.S. Installed Wind Capacity  

Wind Powering America (EERE)

Education Education Printable Version Bookmark and Share Learn About Wind About Wind Power Locating Wind Power Getting Wind Power Installed Wind Capacity Wind for Schools Project Collegiate Wind Competition School Project Locations Education & Training Programs Curricula & Teaching Materials Resources Installed Wind Capacity This page has maps of the United States that show installed wind capacity by state and its progression. This map shows the installed wind capacity in megawatts. As of September 30, 2012, 51,630 MW have been installed. Alaska, 16 MW; Hawaii, 112 MW; Washington, 2,699 MW; Oregon, 3,153 MW; California, 4,570 MW; Nevada, 152; Idaho, 675 MW; Utah, 325 MW; Arizona, 238 MW; Montana, 395 MW; Wyoming, 1,410 MW; Colorado, 1,805 MW; New Mexico, 778 MW; North Dakota, 1,469 MW; South Dakota, 784 MW; Nebraska, 337 MW; Kansas, 1,877 MW; Oklahoma, 2,400 MW; Texas, 10,929 MW; Minnesota, 2,717 MW; Iowa, 4,536 MW; Missouri, 459 MW; Wisconsin, 636 MW; Illinois, 3,055 MW; Tennessee, 29 MW; Michigan, 515 MW; Indiana, 1,343 MW; Ohio, 420 MW; West Virginia, 583 MW; Pennsylvania, 1,029 MW; Maryland, 120 MW; Delaware, 2 MW; New Jersey, 9 MW; New York, 1,418 MW; Vermont, 46 MW; New Hampshire, 125 MW; Massachusetts, 64 MW; Rhode Island, 3 MW; Maine, 397 MW.

345

Southern California Edison High Penetration Photovoltaic Project - Year 1  

SciTech Connect (OSTI)

This report discusses research efforts from the first year of a project analyzing the impacts of high penetration levels of photovoltaic (PV) resources interconnected onto Southern California Edison's (SCE's) distribution system. SCE will be interconnecting a total of 500 MW of commercial scale PV within their service territory by 2015. This Year 1 report describes the need for investigating high-penetration PV scenarios on the SCE distribution system; discusses the necessary PV system modeling and distribution system simulation advances; describes the available distribution circuit data for the two distribution circuits identified in the study; and discusses the additional inverter functionality that could be implemented in order to specifically mitigate some of the undesirable distribution system impacts caused by high-penetration PV installations.

Mather, B.; Kroposki, B.; Neal, R.; Katiraei, F.; Yazdani, A.; Aguero, J. R.; Hoff, T. E.; Norris, B. L.; Parkins, A.; Seguin, R.; Schauder, C.

2011-06-01T23:59:59.000Z

346

Installing and Operating an Efficient Swimming Pool Pump | Department of  

Broader source: Energy.gov (indexed) [DOE]

Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump May 29, 2012 - 7:54pm Addthis Photo courtesy iStockphoto.com Photo courtesy iStockphoto.com What does this mean for me? Use the smallest size pump possible for your swimming pool. Reduce the time your pool pump operates to save money while still keeping your pool clean. You can save energy and maintain a comfortable swimming pool temperature by using a smaller, higher efficiency pump and by operating it less. In a study of 120 pools by the Center for Energy Conservation at Florida Atlantic University, some pool owners saved as much as 75% of their original pumping bill when they used these energy conservation measures (see table below). Table 1. Savings from Pump Conservation Measures

347

Installing a Light Source 'Racetrack' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

348

Nevada manufacturer installing geothermal power plant | Department of  

Broader source: Energy.gov (indexed) [DOE]

Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant Nevada manufacturer installing geothermal power plant August 26, 2010 - 4:45pm Addthis Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Chemetall extracts lithium carbonate, a powder, from brine, a salty solution from within the earth. | Photo courtesy Chemetall Joshua DeLung Chemetall supplies materials for lithium-ion batteries for electric vehicles $28.4 million in Recovery Act funding going toward geothermal plant Plant expected to produce 4 MW of electrical power, employ 25 full-time workers Chemetall produces lithium carbonate to customers in a wide range of industries, including for batteries used in electric vehicles, and now the

349

Ohio Town Installing 'Green' Traffic Signals | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals Ohio Town Installing 'Green' Traffic Signals January 20, 2010 - 3:57pm Addthis Elyria, Ohio, is getting a little greener. Mayor William M. Grace recently confirmed that staff will replace traditional traffic lights with 288 energy-efficient LEDs (light-emitting diodes), saving the town energy and money. "We are definitely doing this, we are going to switch out all the traffic lights in town," Elyria's mayor says. Replacing light bulbs with LEDs will mean substantial savings. That's because these small, solid bulbs can last up to 10 times longer than traditional lights and require considerably less energy. "This gives us the opportunity to change, we expect to realize considerable savings," the mayor says.

350

Installing a Light Source 'Racetrack' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' Installing a Light Source 'Racetrack' March 22, 2011 - 10:42am Addthis Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Brookhaven National Lab's NSLS II Construction Site | Photo Courtesy of Brookhaven National Lab Kendra Snyder This month, workers at Brookhaven National Laboratory's National Synchrotron Light Source II (NSLS-II), the half-mile electron racetrack for one of the world's most advanced light sources, will begin filling the facility's steel and concrete shell. In 2015, NSLS-II will open its doors - and its ultra-bright beams of x-ray, infrared and ultraviolet light - to thousands of researchers around the world, enabling the detailed exploration of everything from

351

Light weight underground pipe or cable installing device  

SciTech Connect (OSTI)

This invention pertains to a light weight underground pipe or cable installing device adapted for use in a narrow and deep operating trench. More particularly this underground pipe installing device employs a pair of laterally movable gates positioned adjacent the bottom of the operating trench where the earth is more solid to securely clamp the device in the operating trench to enable it to withstand the forces exerted as the actuating rod is forced through the earth from the so-called operating trench to the target trench. To accommodate the laterally movable gates positioned adjacent the bottom of the narrow pipe installing device, a pair of top operated double-acting rod clamping jaws, operated by a hydraulic cylinder positioned above the actuating rod are employed.

Schosek, W. O.

1985-01-08T23:59:59.000Z

352

Pasadena Water and Power - Solar Power Installation Rebate | Department of  

Broader source: Energy.gov (indexed) [DOE]

Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate Pasadena Water and Power - Solar Power Installation Rebate < Back Eligibility Commercial Institutional Local Government Nonprofit Residential State Government Savings Category Solar Buying & Making Electricity Program Info State California Program Type Utility Rebate Program Rebate Amount Systems up to 30 kW have the option of receiving an expected performance based buydown (EPBB) or a performance based incentive (PBI). Systems larger than 30 kW are only eligible for the PBI. EPBB (effective 6/1/12): Residential: $1.40/watt AC Commercial and all PPAs: $0.85/watt AC Non-profits and Government: $1.60/watt AC Income-qualified residential: $4.00/watt PBI (effective 6/1/12): Residential: $0.212/kWh Commercial and all PPAs: $0.129/kWh

353

Methods | Transparent Cost Database  

Open Energy Info (EERE)

Methods Methods Disclaimer The data gathered here are for informational purposes only. Inclusion of a report in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a single discount rate in order to compare technology costs only. About the Cost Database For emerging energy technologies, a variety of cost and performance numbers are cited in presentations and reports for present-day characteristics and potential improvements. Amid a variety of sources and methods for these data, the Office of Energy Efficiency and Renewable Energy's technology development programs determine estimates for use in program planning. The Transparent Cost Database collects program cost and performance

354

Economic analysis of a supercritical coal-fired CHP plant integrated with an absorption carbon capture installation  

Science Journals Connector (OSTI)

Abstract Energy investments in Poland are currently focused on supercritical coal-fired unit technology. It is likely, that in the future, these units are to be integrated with carbon capture and storage (CCS) installations, which enable a significant reduction of greenhouse gas emissions into the atmosphere. A significant share of the energy market in Poland is constituted by coal-fired combined heat and power (CHP) plants. The integration of these units with CCS installation can be economically inefficient. However, the lack of such integration enhances the investment risk due to the possibility of appearing on the market in the near future high prices of emission allowances. The aforementioned factors and additional favorable conditions for the development of cogeneration can cause one to consider investing in large supercritical CHP plants. This paper presents the results of an economic analysis aimed at comparing three cases of CHP plants, one without an integrated CCS installation and two with such installations. The same steam cycle structure for all variants was adopted. The cases of integrated CHP plants differ from each other in the manner in which they recover heat. For the evaluation of the respective solutions, the break-even price of electricity and avoided emission cost were used.

?ukasz Bartela; Anna Skorek-Osikowska; Janusz Kotowicz

2014-01-01T23:59:59.000Z

355

Asia Least-Cost Greenhouse Gas Abatement Study | Open Energy Information  

Open Energy Info (EERE)

Least-Cost Greenhouse Gas Abatement Study Least-Cost Greenhouse Gas Abatement Study Jump to: navigation, search Name Asia Least-Cost Greenhouse Gas Abatement Study (ALGAS) Agency/Company /Organization Global Environment Facility, United Nations Development Programme, Asian Development Bank Partner Lawrence Berkeley National Laboratory Sector Energy Topics GHG inventory, Resource assessment, Pathways analysis, Background analysis Resource Type Dataset Website http://ies.lbl.gov/?q=taxonomy UN Region Central Asia, "East Asia" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property., "SE Asia" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

356

LMFBR fuel component costs  

SciTech Connect (OSTI)

A significant portion of the cost of fabricating LMFBR fuels is in the non-fuel components such as fuel pin cladding, fuel assembly ducts and end fittings. The contribution of these to fuel fabrication costs, based on FFTF experience and extrapolated to large LMFBR fuel loadings, is discussed. The extrapolation considers the expected effects of LMFBR development programs in progress on non-fuel component costs.

Epperson, E.M.; Borisch, R.R.; Rice, L.H.

1981-10-29T23:59:59.000Z

357

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

358

U.S. Balance-of-Station Cost Drivers and Sensitivities (Presentation)  

SciTech Connect (OSTI)

With balance-of-system (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non?turbine costs has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from U.S. offshore wind plants.

Maples, B.

2012-10-01T23:59:59.000Z

359

New Resin Improves Efficiency, Reduces Costs in Hanford Site Groundwater  

Broader source: Energy.gov (indexed) [DOE]

The new resin was installed at the 100-DX Groundwater Treatment Facility, where it operated over one year without a single resin change. The new resin was installed at the 100-DX Groundwater Treatment Facility, where it operated over one year without a single resin change. The new resin was installed at the 100-DX Groundwater Treatment Facility, where it operated over one year without a single resin change. An operator tests the resin at a 100K Area pump-andtreat system to determine how much hexavelent chromium contamination it has gathered from the groundwater. An operator tests the resin at a 100K Area pump-andtreat system to determine how much hexavelent chromium contamination it has gathered from the groundwater. ResinTech SIR-700 is being implemented at groundwater treatment systems along the Columbia River to increase efficiency and reduce costs. ResinTech SIR-700 is being implemented at groundwater treatment systems

360

Petroleum well costs.  

E-Print Network [OSTI]

??This is the first academic study of well costs and drilling times for Australia??s petroleum producing basins, both onshore and offshore. I analyse a substantial (more)

Leamon, Gregory Robert

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Early Station Costs Questionnaire  

Broader source: Energy.gov (indexed) [DOE]

of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the...

362

''When Cost Measures Contradict''  

SciTech Connect (OSTI)

When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P. M.

2003-05-09T23:59:59.000Z

363

Low Cost, Durable Seal  

Broader source: Energy.gov [DOE]

This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects.

364

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

365

OSIRIS-Country-by-Country Opportunity Cost Curves | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » OSIRIS-Country-by-Country Opportunity Cost Curves Jump to: navigation, search Tool Summary Name: OSIRIS-Country-by-Country Opportunity Cost Curves Agency/Company /Organization: Conservation International Sector: Climate, Land Focus Area: Agriculture, Forestry Topics: Market analysis Resource Type: Dataset, Software/modeling tools User Interface: Spreadsheet Website: www.conservation.org/osiris/Pages/overview.aspx Cost: Free UN Region: Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia

366

Cost Estimating and Cost Management Capacity Building Workshop  

E-Print Network [OSTI]

Cost Estimating and Cost Management Capacity Building Workshop August 11-13, 2010 Coffman Memorial 574 guidebook on cost estimating and cost management · To learn how states are moving forward with the implementation of the guidebook or other initiatives related to cost estimating and cost management · To share

Minnesota, University of

367

Low Cost Hydrogen Production Platform  

SciTech Connect (OSTI)

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost mo

Timothy M. Aaron, Jerome T. Jankowiak

2009-10-16T23:59:59.000Z

368

Simple Modular LED Cost Model  

Broader source: Energy.gov [DOE]

The LED Cost Model, developed by the DOE Cost Modeling Working Group, provides a simplified method for analyzing the manufacturing costs of an LED package. The model focuses on the major cost...

369

Life-cycle cost analysis of floating offshore wind farms  

Science Journals Connector (OSTI)

Abstract The purpose of this article is to put forward a methodology in order to evaluate the Cost Breakdown Structure (CBS) of a Floating Offshore Wind Farm (FOWF). In this paper CBS is evaluated linked to Life-Cycle Cost System (LCS) and taking into account each of the phases of the FOWF life cycle. In this sense, six phases will be defined: definition, design, manufacturing, installation, exploitation and dismantling. Each and every one of these costs can be subdivided into different sub-costs in order to obtain the key variables that run the life-cycle cost. In addition, three different floating platforms will be considered: semisubmersible, Tensioned Leg Platform (TLP) and spar. Several types of results will be analysed according to each type of floating platform considered: the percentage of the costs, the value of the cost of each phase of the life-cycle and the value of the total cost in each point of the coast. The results obtained allow us to become conscious of what the most important costs are and minimize them, which is one of the most important contributions nowadays. It will be useful to improve the competitiveness of floating wind farms in the future.

Castro-Santos Laura; Diaz-Casas Vicente

2014-01-01T23:59:59.000Z

370

Costing climate change  

Science Journals Connector (OSTI)

...Costenergy analyses of such schemes...and tidal power at costs...consider in economic analyses of GHG abatement...pertaining to wind power in Denmark...In a cost analysis of implementing...Cutting coal combustion...large an economic burden...

2002-01-01T23:59:59.000Z

371

RFAR installation for Buildings 703, 712, 747, 748 and 1163  

SciTech Connect (OSTI)

This document is to certify the installation and testing of the Radio Fire Alarm Reporting box (RFAR). The Hanford Fire Dept. will be notified of troubles via RFAR. The document outlines prerequisites, necessary equipment, and the fire alarm system test to insure the system is operating correctly.

Ferry, M.

1995-12-31T23:59:59.000Z

372

Sun N1 Grid Engine 6.1 Installation Guide  

E-Print Network [OSTI]

Sun N1 Grid Engine 6.1 Installation Guide Sun Microsystems, Inc. 4150 Network Circle Santa Clara, CA 95054 U.S.A. Part No: 820­0697 May 2007 #12;Copyright 2007 Sun Microsystems, Inc. 4150 Network Circle, Santa Clara, CA 95054 U.S.A. All rights reserved. Sun Microsystems, Inc. has intellectual

373

Decidability Results for Dynamic Installation of Compensation Handlers  

E-Print Network [OSTI]

that in a simple -like calculus with static compen- sations the termination of a process is decidable Zavattaro Focus Team, University of Bologna & INRIA, Italy Abstract. Dynamic compensation installation compensations, showing that process termination is decidable for parallel and replacing compensations while

Paris-Sud XI, Université de

375

Geothermal resources of southern Idaho  

SciTech Connect (OSTI)

The geothermal resource of southern Idaho as assessed by the U.S. Geological Survey in 1978 is large. Most of the known hydrothermal systems in southern Idaho have calculated reservoir temperatures of less than 150 C. Water from many of these systems is valuable for direct heat applications. A majority of the known and inferred geothermal resources of southern Idaho underlie the Snake River Plain. However, major uncertainties exist concerning the geology and temperatures beneath the plain. The largest hydrothermal system in Idaho is in the Bruneau-Grang View area of the western Snake River Plain with a calculated reservoir temperature of 107 C and an energy of 4.5 x 10 to the 20th power joules. No evidence of higher temperature water associated with this system was found. Although the geology of the eastern Snake River Plain suggests that a large thermal anomaly may underlie this area of the plain, direct evidence of high temperatures was not found. Large volumes of water at temperatures between 90 and 150 C probably exist along the margins of the Snake River Plain and in local areas north and south of the plain.

Mabey, D.R.

1983-01-01T23:59:59.000Z

376

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

existing avoided cost methodology and established thefor certain avoided cost methodologies or avoided cost inpu

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

377

Cost-Benefit Analysis of Smart Grid Technologies Through System Simulations  

Open Energy Info (EERE)

Cost-Benefit Analysis of Smart Grid Technologies Through System Simulations Cost-Benefit Analysis of Smart Grid Technologies Through System Simulations Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Cost-Benefit_Analysis_of_Smart_Grid_Technologies_Through_System_Simulations&oldid=514355"

378

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

379

Electricity production and cooling energy savings from installation of a  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

production and cooling energy savings from installation of a production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Title Electricity production and cooling energy savings from installation of a building-integrated photovoltaic roof on an office building Publication Type Journal Article Year of Publication 2013 Authors Ban-Weiss, George, Craig P. Wray, William W. Delp, Peter Ly, Hashem Akbari, and Ronnen M. Levinson Journal Energy and Buildings Volume 56 Pagination 210 - 220 ISSN 0378-7788 Keywords Advanced Technology Demonstration, building design, Building heat transfer, cool roof, energy efficiency, Energy Performance of Buildings, energy savings, Energy Usage, energy use, Heat Island Abstract Reflective roofs can reduce demand for air conditioning and warming of the atmosphere. Roofs can also host photovoltaic (PV) modules that convert sunlight to electricity. In this study we assess the effects of installing a building integrated photovoltaic (BIPV) roof on an office building in Yuma, AZ. The system consists of thin film PV laminated to a white membrane, which lies above a layer of insulation. The solar absorptance of the roof decreased to 0.38 from 0.75 after installation of the BIPV, lowering summertime daily mean roof upper surface temperatures by about 5 °C. Summertime daily heat influx through the roof deck fell to ±0.1 kWh/m2from 0.3-1.0 kWh/m2. However, summertime daily heat flux from the ventilated attic into the conditioned space was minimally affected by the BIPV, suggesting that the roof was decoupled from the conditioned space. Daily PV energy production was about 25% of building electrical energy use in the summer. For this building the primary benefit of the BIPV appeared to be its capacity to generate electricity and not its ability to reduce heat flows into the building. Building energy simulations were used to estimate the cooling energy savings and heating energy penalties for more typical buildings.

380

EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development  

Broader source: Energy.gov [DOE]

Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

INFOGRAPHIC: Let's Get to Work on Solar Soft Costs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

INFOGRAPHIC: Let's Get to Work on Solar Soft Costs INFOGRAPHIC: Let's Get to Work on Solar Soft Costs INFOGRAPHIC: Let's Get to Work on Solar Soft Costs December 2, 2013 - 1:00pm Addthis Learn how soft costs are contributing to the price of solar energy systems in the United States. Learn more about what the Energy Department is doing to lower soft costs and increase deployment of solar energy systems. | Infographic by SunShot Learn how soft costs are contributing to the price of solar energy systems in the United States. Learn more about what the Energy Department is doing to lower soft costs and increase deployment of solar energy systems. | Infographic by SunShot Addthis Related Articles Soft costs now account for more than 60% of the total price of installing residential solar energy systems. View the full infographic to learn more.

382

INFOGRAPHIC: Let's Get to Work on Solar Soft Costs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

INFOGRAPHIC: Let's Get to Work on Solar Soft Costs INFOGRAPHIC: Let's Get to Work on Solar Soft Costs INFOGRAPHIC: Let's Get to Work on Solar Soft Costs December 2, 2013 - 1:00pm Addthis Learn how soft costs are contributing to the price of solar energy systems in the United States. Learn more about what the Energy Department is doing to lower soft costs and increase deployment of solar energy systems. | Infographic by SunShot Learn how soft costs are contributing to the price of solar energy systems in the United States. Learn more about what the Energy Department is doing to lower soft costs and increase deployment of solar energy systems. | Infographic by SunShot Addthis Related Articles Soft costs now account for more than 60% of the total price of installing residential solar energy systems. View the full infographic to learn more.

383

Lookin g for data personnel costs, indirect costs, equipment costs  

Broader source: Energy.gov (indexed) [DOE]

Negotiating Group Question/Answer Sessions November 19, 2009 Q: What happens now? A: The negotiation process starts tomorrow [November 20, 2009], when DOE will be sending the Awardees an e-mail with information about which website to go to for clarification and direction, information from the Office of Civil Rights, and answers to some of the questions that came up in the meeting. DOE will be gathering information about the questions concerning cyber requirements, metrics, and reporting requirements and will be getting back to the awardees about those issues the week after Thanksgiving. We have done a review of the budgets, and emails will be sent giving opportunities to address any issues. We will also re-review technical and cost proposals.

384

Designing, selecting and installing a residential ground-source heat pump system  

SciTech Connect (OSTI)

It's a compelling proposition: Use the near-constant-temperature heat underground to heat and cool your home and heat domestic water, slashing your energy bills. Yet despite studies demonstrating significant energy savings from ground-source heat pump (GSHP) systems, their adoption has been hindered by high upfront costs. Fewer than 1% of US homes use a GSHP system. However, compared to a minimum-code-compliant conventional space-conditioning system, when properly designed and installed, a GSHP retrofit at current market prices offers simple payback of 4.3 years on national average, considering existing federal tax credits. Most people understand how air-source heat pumps work: they move heat from indoor air to outdoor air when cooling and from outdoor air to indoor air when heating. The ground-source heat pump operates on the same principle, except that it moves heat to or from the ground source instead of outdoor air. The ground source is usually a vertical or horiontal ground heat exchanger. Because the ground usually has a more favorable temperature than ambient air for the heating and cooling operation of the vapor-compression refrigeration cycle, GSHP sysems can operate with much higher energy efficiencies than air-source heat pump systems when properly designed and installed. A GSHP system used in a residual building typically provides space conditioning and hot water and comprises three major components: a water-source heat pump unit designed to operate at a wider range of entering fluid temperatures (typically from 30 F to 110 F, or 1 C to 43 C) than a conventional water-source heat pump unit; a ground heat exchanger (GHX); and distribution systems to deliver hot water to the storage tank and heating or cooling to the conditioned rooms. In most residual GSHP systems, the circulation pumps and associated valves are integrated with the heat pump to circulate the heat-carrier fluid (water or aqueous antifreeze solution) through the heat pump and the GHX. A recent assessment indicates that if 20% of US homes replaced their existing space-conditioning and water-heating systems with properly designed, installed and operated state-of-the-art GSHP systems, it would yield significant benefits each year. These include 0.8 quad British thermal units (Btu) of primary energy savings, 54.3 million metric tons of CO{sub 2} emission reductions, $10.4 billion in energy cost savings and 43.2 gigawatts of reduction in summer peak electrical demand.

Hughes, Patrick [ORNL; Liu, Xiaobing [ORNL; Munk, Jeffrey D [ORNL

2010-01-01T23:59:59.000Z

385

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

386

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

387

Cost Effective Sustainable Housing.  

E-Print Network [OSTI]

??Cost Effective Sustainable Housing The topic of research which was discussed throughout this study was an analysis of sustainable development between single-family and multi-family structures. (more)

Morton, Joshua

2009-01-01T23:59:59.000Z

388

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

389

Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and Renewable Energy Get Widget Code...

390

Costing climate change  

Science Journals Connector (OSTI)

...even whether man-made greenhouse-gas emissions should...and monetary savings from lighting policy calculated using `Work Energy Smart Lighting Calculator', assuming...reducing energy costs and greenhouse gases. Australian Greenhouse...

2002-01-01T23:59:59.000Z

391

Estimating environmental costs  

Science Journals Connector (OSTI)

Added demands on natural resources and proposed environmental regulations could potentially have a significant impact on the production and operational costs of information technology (IT). In this paper, we utilize an Economic Input-Output Life-Cycle ...

Kiara Corrigan; Amip Shah; Chandrakant Patel

2010-02-01T23:59:59.000Z

392

Monitored performance of residential geothermal heat pumps in central Texas and Southern Michigan  

SciTech Connect (OSTI)

This report summarizes measured performance of residential geothermal heat pumps (GHP`s) that were installed in family housing units at Ft. Hood, Texas and at Selfridge Air National Guard base in Michigan. These units were built as part of a joint Department of Defense/Department of Energy program to evaluate the energy savings potential of GHP`s installed at military facilities. At the Ft. Hood site, the GHP performance was compared to conventional forced air electric air conditioning and natural gas heating. At Selfridge, the homes under test were originally equipped with electric baseboard heat and no air conditioning. Installation of the GHP systems at both sites was straightforward but more problems and costs were incurred at Selfridge because of the need to install ductwork in the homes. The GHP`s at both sites produced impressive energy savings. These savings approached 40% for most of the homes tested. The low cost of energy on these bases relative to the incremental cost of the GHP conversions precludes rapid payback of the GHP`s from energy savings alone. Estimates based on simple payback (no inflation and no interest on capital) indicated payback times from 15 to 20 years at both sites. These payback times may be reduced by considering the additional savings possible due to reduced maintenance costs. Results are summarized in terms of 15 minute, hourly, monthly, and annual performance parameters. The results indicate that all the systems were working properly but several design shortcomings were identified. Recommendations are made for improvements in future installations at both sites.

Sullivan, W.N.

1997-11-01T23:59:59.000Z

393

Pantex installs new high explosives equipment | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

394

Microsoft Word - Final_NineCanyon_CommunicationTowerInstall_CX  

Broader source: Energy.gov (indexed) [DOE]

1, 2013 1, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kelly Gardner, PMP Project Manager, TEP-TPP-1 Proposed Action: Nine Canyon Substation Communication Tower Addition: 331800 McNary Sub Bus Tie Relay Replacements and 310427 McNary-Badger Canyon Transfer Trip Install Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and modifications to transmission facilities Location: Kennewick, Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a 60-foot communications tower and associated communication equipment at the Benton County Public Utility District's Nine Canyon Substation in Benton County, Washington. The upgrade would involve replacing the

395

Pantex installs new high explosives equipment | National Nuclear Security  

National Nuclear Security Administration (NNSA)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

396

Idaho National Engineering Laboratory installation roadmap document. Revision 1  

SciTech Connect (OSTI)

The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

Not Available

1993-05-30T23:59:59.000Z

397

Safety assessment of discharge chute isolation barrier preparation and installation  

SciTech Connect (OSTI)

This analysis examines activities associated with the installation of isolation barriers in the K Basins at the Hanford Reservation. This revision adds evaluation of barrier drops on stored fuel and basin floor, identifies fuel which will be moved and addresses criticality issues with sludge. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

Meichle, R.H.

1994-10-21T23:59:59.000Z

398

Site selection for the installation of autonomous desalination systems (ADS)  

Science Journals Connector (OSTI)

The geographic location of a final site where an ADS unit can be installed has a strong influence on the success of that project. If the desalination unit is not located in the most favorable position, the competitive advantages of the process can be wiped out. Considerable care must be exercised in selecting the unit site, and many different factors must be considered. The aim of this work is to present amethodology to identify and select themost favorable sites to install ADS units. Collection of the basic data and evaluation are the essential steps for the identification of sites. The favorable sites can be screened based on the criteria developed in this work for the purpose of selecting the best apparent site. Scoring of the various criteria, when combined with the weighting system, establishes an overall ranked score for each site. A detailed description of the selection methodology will be presented.

F. Banat; V. Subiela; H. Qiblawey

2007-01-01T23:59:59.000Z

399

Interface and installation guide: SAFT-UT utilities  

SciTech Connect (OSTI)

This document is one in a set of three reference documents pertaining to the SAFT-UT Utilities. The GUIDE TO SAFT-UT PRINCIPLES AND CONVENTIONS provides the user with an overall background for practical implementation of SAFT-UT and the associated software utilities. The REFERENCE MANUAL describes in detail each utility available to the user. This document, the INTERFACE AND INSTALLATION GUIDE, describes the steps necessary to install the SAFT utilities and Real-Time Processor on a VAX class computer running the VMS operating system. It also describes in detail the method for adaptation of user data files and the user's data collection system to the SAFT-UT Utility set.

Hall, T.E.

1987-10-01T23:59:59.000Z

400

Waveform Relocated Earthquake Catalog for Southern California...  

Open Energy Info (EERE)

in the southern California crust. Hypocenters in the new relocated catalogexhibit tighter spatial clustering of seismicity than does the routinely generated catalog,and the depth...

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Iron Availability in the Southern Ocean  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Southern Ocean, circling the Earth between Antarctica and the southernmost regions of Africa, South America, and Australia, is notorious for its high-nutrient, low-chlorophyll...

402

New BPM installed in BC2 Jan Hauschildt  

E-Print Network [OSTI]

New BPM installed in BC2 Compact! Thanks to: Jan Hauschildt Dirk Noelle Silke Vilcins Holger 30 40 time (ns) Volts chicane BPM scope traces for 12-16 MV/m gradient Scope in tunnel ~ 150 um resolution => 5*10-4 resolution #12;-20 -15 -10 -5 0 0.9 1 1.1 1.2 1.3 1.4 1.5 BPM slope phase (deg

403

Open PV Project: Unlocking PV Installation Data (Brochure)  

SciTech Connect (OSTI)

This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

Not Available

2012-04-01T23:59:59.000Z

404

CSP'960H/CSP-960S Installation Guide  

E-Print Network [OSTI]

CSP'960H/CSP-960S Installation Guide 4-634-979-01 TM Read First! 1^00 - 3lG - 755; #12;CSP-960H/CSP CSP-960H only) J Sony CDU926S CD-R Drive Unit User's Guide Use this manual as a guide to help you. If all the items are not found, please contact your Sony dealer before proceeding. G CSP-960H/960S CD

Kleinfeld, David

405

Solar heating system installed at Jackson, Tennessee. Final report  

SciTech Connect (OSTI)

The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

None

1980-10-01T23:59:59.000Z

406

Rural migration in southern Nevada  

SciTech Connect (OSTI)

This study reviews the history of migration in two rural counties in Southern Nevada. It is part of a larger study about the impact of a proposed high-level nuclear waste repository on in- and out-migration patterns in the state. The historical record suggests a boom and bust economic cycle has predominated in the region for the past century creating conditions that should be taken into account by decision makers when ascertaining the long-term impacts of the proposed repository.

Mosser, D.; Soden, D.L.

1993-08-01T23:59:59.000Z

407

Installed Geothermal Capacity/Data | Open Energy Information  

Open Energy Info (EERE)

Installed Geothermal Capacity/Data Installed Geothermal Capacity/Data < Installed Geothermal Capacity Jump to: navigation, search Download a CSV file of the table below: CSV FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate HeatRate WindTurbineManufacturer FacilityStatus Aidlin Geothermal Facility Geothermal Steam Power Plant Calpine Geysers Geothermal Area 20 MW20,000 kW 20,000,000 W 20,000,000,000 mW 0.02 GW 2.0e-5 TW 2 1989 Amedee Geothermal Facility Binary Cycle Power Plant Amedee Geothermal Venture Honey Lake, California 1.6 MW1,600 kW 1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW 2 1988 BLM Geothermal Facility Double Flash Coso Operating Co. Coso Junction, California, 90 MW90,000 kW 90,000,000 W

408

Empirically Derived Strength of Residential Roof Structures for Solar Installations.  

SciTech Connect (OSTI)

Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

Dwyer, Stephen F.; Sanchez, Alfred; Campos, Ivan A.; Gerstle, Walter H.

2014-12-01T23:59:59.000Z

409

Tokamak reactor cost model based on STARFIRE/WILDCAT costing  

SciTech Connect (OSTI)

A cost model is presented which is useful for survey and comparative studies of tokamak reactors. The model is heavily based on STARFIRE and WILDCAT costing guidelines, philosophies, and procedures and reproduces the costing for these devices quite accurately.

Evans, K. Jr.

1983-03-01T23:59:59.000Z

410

Install the E-print Network toolbar -- Energy, science, and technology for  

Office of Scientific and Technical Information (OSTI)

Browser Toolbar The E-print Network offers a browser toolbar for easy access to e-print searches and discipline pages. EPN browser toolbar Two installation options are available for the EPN browser toolbar: Internet Explorer - Download and install the toolbar using the Softomate ActiveX Web installer Please select "Install ActiveX Control" when prompted by your browser. Install toolbar for Internet Explorer Can't see the toolbar after installing? Note: Browser security settings at some organizations may prevent installation or use of the toolbar in Internet Explorer. Try installing the toolbar in the FireFox browser, using the button below. Minimum System Requirements: Windows XP/Vista Internet Explorer 6 or Firefox 2 FireFox - Install toolbar for FireFox

411

Low-Cost "Vacuum Desiccator"  

Science Journals Connector (OSTI)

Low-Cost "Vacuum Desiccator" ... Described are individualized, low-cost, and safe desiccators that can be efficiently and rapidly made with an inexpensive kitchen aid sold for shrink-wrapping food. ... Cost-Effective Teacher ...

Frederick Sweet

2004-10-01T23:59:59.000Z

412

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

413

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

414

Sunk Costs and Competitive Bidding  

E-Print Network [OSTI]

SUNK COSTS AND COMPETITIVE BIDDING Kenneth R. FrenchRevised: November 1982 SUNK COSTS AND COMPETITIVE BIDDINGl the winning bid be? I f sunk costs do not matter, I f the

French, Kenneth R.; McCormick, Robert E.

1982-01-01T23:59:59.000Z

415

Renewable build-up pathways for the US: Generation costs are not system costs  

E-Print Network [OSTI]

The transition to a future electricity system based primarily on wind and solar PV is examined for all regions in the contiguous US. We present optimized pathways for the build-up of wind and solar power for least backup energy needs as well as for least cost obtained with a simplified, lightweight model based on long-term high resolution weather-determined generation data. In the absence of storage, the pathway which achieves the best match of generation and load, thus resulting in the least backup energy requirements, generally favors a combination of both technologies, with a wind/solar PV energy mix of about 80/20 in a fully renewable scenario. The least cost development is seen to start with 100% of the technology with the lowest average generation costs first, but with increasing renewable installations, economically unfavorable excess generation pushes it toward the minimal backup pathway. Surplus generation and the entailed costs can be reduced significantly by combining wind and solar power, and/or a...

Becker, Sarah; Andresen, Gorm B; Jacobson, Mark Z; Schramm, Stefan; Greiner, Martin

2014-01-01T23:59:59.000Z

416

Assigning research and development costs  

E-Print Network [OSTI]

and Development Cost Components RESEARCH AND DEVELOPMENT COSTS IN FINANCIAL STATEMENTS . 10 Capitalization Basis for Reporting Research and Development Costs Revenue Basis for Reporting Research and Development Costs Reasons Why Most Companies Expense... PRACTICE WITH ACCOUNTING THEORY Unknown Results at the End of an Accounting Period Uncertain Useful Life of Results. . . . . . . . . . . . . Recurrence of Annual Costs Permissive Feature of the Internal Revenue Code Uniform Amounts of Annual Costs...

Edwards, Wendell Edward

2012-06-07T23:59:59.000Z

417

Post?installation activities in the Comprehensive Nuclear Test Ban Treaty (CTBT) International Monitoring System (IMS) infrasound network  

Science Journals Connector (OSTI)

The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear?Test?Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network to repair faulty equipment and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently 11 of the 60 IMS infrasound stations are transmitting data in the post?installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post?certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post?installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost?efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations as well as Configuration Management and Network Sustainment.

2002-01-01T23:59:59.000Z

418

Validation of a black-box heat pump simulation model by means of field test results from five installations  

Science Journals Connector (OSTI)

Abstract In the residential sector, heat pumps are applied for domestic hot water and space heating. Simulations are widely used for general research in the field of heat pumps and to some extend to plan such installations. The advantages are low expenditure of time and costs compared to laboratory or field tests. Validation of simulation models is mandatory to guarantee a sufficient quality. In the presented paper, the field monitoring results of five ground-source installations are utilised for the validation of a black-box heat pump model. The model is similar to TRNSYS Type 201, but implemented in IDA ICE and then modified to handle the difficulties caused by non-standard mass flow and rampant polynomials. As overall result, deviations between 1% and 32% regarding modelled and measured efficiency are seen on monthly basis. The overall result appears as convincing, taking into account typical inaccuracies of laboratory and field tests as well as tolerances during heat pump production. As a side effect, the influence of standby consumption was quantified. For the five presented installations, standby amounts to fractions between 2 and 5% of the annual electricity consumption of the heat pump units.

Jrn Ruschenburg; Tomislav ?uti?; Sebastian Herkel

2014-01-01T23:59:59.000Z

419

Departments of Energy, Defense Partner to Install Fuel Cell Backup...  

Energy Savers [EERE]

such as catalysts and membranes at several companies including 3M, Dupont, Gore, Johnson Matthey, and BASF. This research has helped reduce the costs of fuel cells by up to...

420

Upcoming Funding Opportunity for Tower Manufacturing and Installation  

Broader source: Energy.gov [DOE]

The DOE Wind Program has issued a Notice of Intent for a funding opportunity, tentatively titled U.S. Wind Manufacturing: Taller Hub Heights to Access Higher Wind Resources, and Lower Cost of Energy.

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

ASSOCIATE DEAN Southern Saskatchewan Campus and  

E-Print Network [OSTI]

1 ASSOCIATE DEAN Southern Saskatchewan Campus and Advancement of Global Health Strategies POSITION of Nursing, the Associate Dean Southern Saskatchewan Campus and Advancement of Global Health Strategies geographical region of Saskatchewan, the Associate Dean will act as the Dean's designate in operational

Saskatchewan, University of

422

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

423

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

424

Power Plant Cycling Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Plant Cycling Costs Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Prepared under Subcontract No. NFT-1-11325-01

425

Cost Controls Pay Off Big  

Science Journals Connector (OSTI)

Cost Controls Pay Off Big ... Biggest plus was the general improvement in the economy; but to this must be added successful efforts by industry to control costs. ...

1959-02-16T23:59:59.000Z

426

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

427

Low Cost, Durable Seal  

SciTech Connect (OSTI)

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

428

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

all system types (e.g. , rack-mounted, building-integrated,if focused exclusively on rack- mounted systems). Somewhatbuilding-integrated vs. rack-mounted and crystalline silicon

Wiser, Ryan

2009-01-01T23:59:59.000Z

429

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

within the sample (e.g. , rack-mounted, building-integrated,if focused exclusively on rack- mounted systems). Among PV$0.9/W more, on average, than rack-mounted systems ($8.3/W

Barbose, Galen L

2010-01-01T23:59:59.000Z

430

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

Incentive Program Lompoc PV Rebate Program SMUD ResidentialCO Governor's Energy Office Solar Rebate Program CCEF OnsiteProgram MSEO Solar Electric Rebate Program NJCEP Customer

Barbose, Galen L

2010-01-01T23:59:59.000Z

431

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

Renewable Energy Resources Rebate Program 10-100 kW >100 kWRenewable Energy Resources Rebate Program MW No. Systems MAEnergy Office: Solar Electric Rebate Program MW No. Systems

Wiser, Ryan

2009-01-01T23:59:59.000Z

432

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

RenewableGenerations Rebate Program NYSERDA PV IncentiveMinnesotas Solar Electric Rebate Program, and the Wisconsinhave offered various grant and rebate programs for renewable

Barbose, Galen

2011-01-01T23:59:59.000Z

433

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

Rebate Program NJ Clean Energy Program: Customer Onsite Renewable Energy (CORE) Program NYRebate Program MW No. Systems NJ Clean Energy Program: Customer Onsite Renewable Energy Program MW NY

Wiser, Ryan

2009-01-01T23:59:59.000Z

434

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

RenewableGenerations Rebate Program NY NYSERDA PV IncentiveNY OR Program Administrator(s) and Program Name NPC/SPPC RenewableGenerations RebateRebate Program NV 10-100 kW >100 kW ?10 kW NYSERDA PV Incentive Program NY

Barbose, Galen

2011-01-01T23:59:59.000Z

435

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

RenewableGenerations Rebate Program NY NYSERDA PV IncentiveRebate Program NV 10-100 kW >100 kW ?10 kW NY NYSERDA PV

Barbose, Galen L

2010-01-01T23:59:59.000Z

436

The Costs, Air Quality, and Human Health Effects of Meeting Peak Electricity Demand with Installed Backup Generators  

Science Journals Connector (OSTI)

E.G. thanks John Dawson, Rob Pinder, and Pavan Racherla for assistance with the PMCAMx model, and Janet Joseph, Peter Savio, and Gunnar Walmet from NYSERDA for useful information about backup generators and emergency demand response programs in New York City. ...

Elisabeth A. Gilmore; Lester B. Lave; Peter J. Adams

2006-10-21T23:59:59.000Z

437

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

Californias Emerging Renewables Program, Self-Generation Incentive Program, and Anaheim Solar Advantage Program) provided capacity

Barbose, Galen L

2010-01-01T23:59:59.000Z

438

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

2008. Solar Annual 2008: Four Peaks. Boston, Massachusetts.solar set-aside in 2007, the highest average REC prices (based on trading through Evolution Markets) occurred in Massachusetts,

Wiser, Ryan

2009-01-01T23:59:59.000Z

439

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

Solar Partnership CPUC California Solar Initiative CA CPUC>100 kW ?10 kW CA CPUC California Solar Initiative 10-100 kWinstalled through the California Solar Initiative program

Barbose, Galen L

2010-01-01T23:59:59.000Z

440

Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007  

E-Print Network [OSTI]

for Sustainable Energy: California Solar Initiative MW No.Sustainable Energy: California Solar Initiative 10-100 kW >Sustainable Energy: California Solar Initiative (CSI) Los

Wiser, Ryan

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

data provided by the California Solar Initiative, MinnesotaIncentive ?10 kW CPUC California Solar Initiative (CSI) CAinstalled through the California Solar Initiative (CSI)

Barbose, Galen

2011-01-01T23:59:59.000Z

442

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

1308 5.4 MW n=2489 15 MW n=3526 34 MW n=5527 44 MW n=5193 57=180 n=217 n=1308 n=2489 n=3526 n=5527 n=5193 n=8677 n=12103

Barbose, Galen L

2010-01-01T23:59:59.000Z

443

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008  

E-Print Network [OSTI]

based on solar energy production. Tracking the Sun II: Thea projection of annual energy production. Several programs,based on actual energy production, as either a supplement or

Barbose, Galen L

2010-01-01T23:59:59.000Z

444

A new species of Thelypteris (Thelypteridaceae) from southern Bahia, Brazil  

E-Print Network [OSTI]

Forests of Northeastern Brazil. Memoirs of the New Yorkin southern Bahia, Brazil. Biodiversity and Conservation 7:Atlantic Coastal Forest of southern Bahia, Brazil. In: W. W.

Matos, Fernando B.; Smith, Alan R.; Labiak, Paulo H.

2010-01-01T23:59:59.000Z

445

DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville...  

Energy Savers [EERE]

Southern Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville, AL Case study of the first manufactured home built to the DOE Zero Energy...

446

DOE's Studies of Weekday/Weekend Ozone Pollution in Southern...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Studies of WeekdayWeekend Ozone Pollution in Southern California DOE's Studies of WeekdayWeekend Ozone Pollution in Southern California 2002 DEER Conference Presentation:...

447

High Tonnage Forest Biomass Production Systems from Southern...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

High Tonnage Forest Biomass Production Systems from Southern Pine Energy Plantations High Tonnage Forest Biomass Production Systems from Southern Pine Energy Plantations This...

448

DOE Pens New Agreement with Southern Company to Test Advanced...  

Energy Savers [EERE]

Pens New Agreement with Southern Company to Test Advanced Carbon-Capture & Gasification Technologies DOE Pens New Agreement with Southern Company to Test Advanced Carbon-Capture &...

449

DOE Zero Energy Ready Home Case Study: Southern Energy Homes...  

Office of Environmental Management (EM)

Southern Energy Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Energy Homes, Russellville, AL Case study of the first manufactured home built to the DOE...

450

Alternate Fuel Cell Membranes at the University of Southern Mississipp...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Alternate Fuel Cell Membranes at the University of Southern Mississippi Alternate Fuel Cell Membranes at the University of Southern Mississippi April 16, 2013 - 12:00am Addthis...

451

Cost Type Examples Salary costs for staff working  

E-Print Network [OSTI]

Cost Type Examples Salary costs for staff working on the grant Fellows, research assistants by the technician can be supported by a verifiable audit trail. Specialist consultancy fees Recruitment costs Staff recruitment and advertising costs, including interviewee travel. Materials & consumables Laboratory chemicals

Rambaut, Andrew

452

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network [OSTI]

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling Oak Ridge National fiber reinforced composites have enjoyed limited acceptance in the automotive industry due to high costs to bond with composite matrix material. It is important that a carbon fiber manufacturing cost model

453

Oil/gas separator for installation at burning wells  

DOE Patents [OSTI]

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

1993-03-09T23:59:59.000Z

454

Oil/gas separator for installation at burning wells  

SciTech Connect (OSTI)

An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait`s oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

Alonso, C.T.; Bender, D.A.; Bowman, B.R. [and others

1991-12-31T23:59:59.000Z

455

Land-Based Wind Plant Balance-of-System Cost Drivers and Sensitivities (Poster)  

SciTech Connect (OSTI)

With Balance of System (BOS) costs contributing up to 30% of the installed capital cost, it is fundamental to understand the BOS costs for wind projects as well as potential cost trends for larger turbines. NREL developed a BOS model using project cost estimates developed by industry partners. Aspects of BOS covered include engineering and permitting, foundations for various wind turbines, transportation, civil work, and electrical arrays. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and geographic characteristics. Based on the new BOS model, an analysis to understand the non?turbine wind plant costs associated with turbine sizes ranging from 1-6 MW and wind plant sizes ranging from 100-1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of wind project BOS, and explores the sensitivity of the capital investment cost and the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrate the potential impact of turbine size and project size on the cost of energy from US wind plants.

Mone, C.; Maples, B.; Hand, M.

2014-04-01T23:59:59.000Z

456

Southern Energy Efficiency Center (SEEC)  

SciTech Connect (OSTI)

The Southern Energy Efficiency Center (SEEC) builds collaborative partnerships with: state and local governments and their program support offices, the building delivery industry (designers, contractors, realtors and commissioning agents), product manufacturers and their supply chains, utilities and their program implementers, consumers and other stakeholders in order to forge a strong regional network of building energy efficiency allies. Through a project Steering Committee composed of the state energy offices and building industry stakeholders, the SEEC works to establish consensus-based goals, priorities and strategies at the regional, state and local levels that will materially advance the deployment of high-performance beyond code buildings. In its first Phase, SEEC will provide limited technical and policy support assistance, training, certification and education to a wide spectrum of the building construction, codes and standards, and the consumer marketplace.

Vieira, Robin; Sonne, Jeffrey; Withers, Charles; Cummings, James; Verdict, Malcolm; Roberts, Sydney

2009-09-30T23:59:59.000Z

457

Southern hemisphere tropospheric aerosol microphysics  

SciTech Connect (OSTI)

Aerosol particle size distribution data have been obtained in the southern hemisphere from approximately 4{degree}S to 44{degree}S and between ground level and 6 km, in the vicinity of eastern Australia. The relative shape of the free-tropospheric size distribution for particles with radii larger than approximately 0.04 {mu}m was found to be remarkably stable with time, altitude, and location for the autumn-winter periods considered. This was despite some large concentration changes which were found to be typical of the southeastern Australian coastal region. The majority of free-troposphere large particles were found to have sulfuric acid or lightly ammoniated sulfate morphology. Large particles in the boundary layer almost exclusively had a sea-salt morphology.

Gras, J.L. (Commonwealth Scientific and Industrial Research Organization, Aspendale (Australia))

1991-03-20T23:59:59.000Z

458

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for  

Broader source: Energy.gov (indexed) [DOE]

Business Travel Business Travel Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for Business Travel October 7, 2013 - 1:37pm Addthis YOU ARE HERE Step 4 Once business travel reduction strategies have been identified, a Federal agency may evaluate the cost of implementing those measures and any potential savings from avoided travel. The annual costs associated with reducing business travel may vary greatly by agency, program, and site depending on the current level of video conferencing and desktop collaboration solutions that are available between the organization's major travel destinations. This will be largely driven by whether the agency has to install or upgrade equipment or just make them more accessible and familiar to users. Strategies focused on policy and

459

The California Solar Initiative: Cost Trends in Customer-Sited PV  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The California Solar Initiative: Cost Trends in Customer-Sited PV The California Solar Initiative: Cost Trends in Customer-Sited PV Installations and the Impact of Retail Rate Design on the Economics of PV Systems Speaker(s): Ryan Wiser Date: January 9, 2007 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Anita Estner California's new solar initiative will dedicate over $3 billion of public funds to support the installation of customer-sited solar installations in the state over the next 10 years, principally in the form of residential and commercial photovoltaic (PV) systems. These efforts build from historical programs that have made California the third largest PV market in the world, behind Germany and Japan. This talk will summarize recent efforts at Berkeley Lab to advise the state's energy agencies in the design

460

Invoice Statement of Cost Cost Type/Cost Share UT-B Contracts Div Page 1 of 1  

E-Print Network [OSTI]

Invoice Statement of Cost ­ Cost Type/Cost Share UT-B Contracts Div Aug 2009 Page 1 of 1 invoice-state-cost-ext-venx-aug09 Company Name: Statement of Amounts Claimed Invoice Number: Statement of Cost ­ Cost Type/Cost Cost Subcontractor Cost Job Title Name Current Hours Rate Current Amount Cumulative Hours Cumulative

Pennycook, Steve

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Fact #643: October 4, 2010 Four Cylinder Engine Installations Continue to Rise  

Broader source: Energy.gov [DOE]

The share of 4 cylinder engines installed in light vehicles has been increasing since 2004. Beginning in 2006, cars have shown an increase in 4 cylinder engine installations while 8 cylinder engine...

462

Robust Cost Colorings Takuro Fukunaga  

E-Print Network [OSTI]

Robust Cost Colorings Takuro Fukunaga Magn´us M. Halld´orsson Hiroshi Nagamochi Abstract We consider graph coloring problems where the cost of a coloring is the sum of the costs of the colors, and the cost of a color is a monotone concave function of the total weight of the class. This models resource

Halldórsson, Magnús M.

463

Cost Estimates for New Molecules  

Science Journals Connector (OSTI)

Cost Estimates for New Molecules ... Once this has been carried out, the projected cost/kilogram for the new drug substance (if only raw material costs and no manufacturing/overhead/labour costs are considered) may well come down by a factor of 10 or even 100, and this is often more acceptable to management trying to make strategic decisions about potential profitability. ...

Trevor Laird

2005-02-22T23:59:59.000Z

464

Cost Sharing Why and How  

E-Print Network [OSTI]

Cost Sharing Why and How Trudy M. Riley Assistant Provost, Research Administration Susan M. Tkachick Sponsored Research Accountant $ Research Office #12;Research Office AGENDA What is Cost Sharing Why Cost Share What is Allowable Managing Cost Sharing during the life of the project What happens

Firestone, Jeremy

465

7 - Cost-Efficiency Evaluation  

Science Journals Connector (OSTI)

The purpose of cost-efficiency evaluations is to make the connection between cost and outcomes. Using methods like cost-benefit analysis and cost-effective analysis, this allows evaluators to provide the most complete information. The information may be used to make better decisions about implementation or continuing a program.

Gennaro F. Vito; George E. Higgins

2015-01-01T23:59:59.000Z

466

Simulating environmental changes due to marine hydrokinetic energy installations.  

SciTech Connect (OSTI)

Marine hydrokinetic (MHK) projects will extract energy from ocean currents and tides, thereby altering water velocities and currents in the site's waterway. These hydrodynamics changes can potentially affect the ecosystem, both near the MHK installation and in surrounding (i.e., far field) regions. In both marine and freshwater environments, devices will remove energy (momentum) from the system, potentially altering water quality and sediment dynamics. In estuaries, tidal ranges and residence times could change (either increasing or decreasing depending on system flow properties and where the effects are being measured). Effects will be proportional to the number and size of structures installed, with large MHK projects having the greatest potential effects and requiring the most in-depth analyses. This work implements modification to an existing flow, sediment dynamics, and water-quality code (SNL-EFDC) to qualify, quantify, and visualize the influence of MHK-device momentum/energy extraction at a representative site. New algorithms simulate changes to system fluid dynamics due to removal of momentum and reflect commensurate changes in turbulent kinetic energy and its dissipation rate. A generic model is developed to demonstrate corresponding changes to erosion, sediment dynamics, and water quality. Also, bed-slope effects on sediment erosion and bedload velocity are incorporated to better understand scour potential.

Jones, Craig A. (Sea Engineering Inc., Santa Cruz, CA); James, Scott Carlton; Roberts, Jesse Daniel (Sandia National Laboratories, Albuquerque, NM); Seetho, Eddy

2010-08-01T23:59:59.000Z

467

Troll Phase 1, installation of large spools before pipelay  

SciTech Connect (OSTI)

Development of the Troll Phase 1 project required landfall--towards a gas conditioning plant on the Norwegian west coast--of both 36-in. wet gas fed (or import) pipelines and 40-inch dry gas export pipelines. The very uneven seabed necessitated both the driving of a 3.5 km long subsea tunnel system and extensive route preparations. The lateral separation of 142 to 163 m between subsea tunnel pipeline risers and offshore pipeline laydown was bridged by fabricating four large--147 to 186 tons--spools. These spools were installed gas-filled in unique single lifts using special sea fastening and guidance systems. The odd-shaped 3-D spool configurations were fabricated to match an extensively prepared seabed. The spools were installed after tunnel pipeline riser completion but before pipeline laydown to minimize the duration of underwater activities late in the season. Special support structures were fabricated to support hyperbaric welding and pipeline laydown operations. Accurate pipeline laydown facilitated simple and quick lift, shift and alignment operations, and all (seven) automated hyperbaric welds with the Pipeline Repair Systems (PRS) were completed on schedule without the use of pup-pieces. Diver support during these activities constituted a significant operation in itself.

Buchan, S. [Rockwater AS, Stavanger (Norway); Kuhlmann, J.H. [A/S Norske Shell, Bergen (Norway)

1996-12-01T23:59:59.000Z

468

Analysis of a Cluster Strategy for Near Term Hydrogen Infrastructure Rollout in Southern California  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a Cluster Strategy for a Cluster Strategy for Near term Hydrogen Infrastructure Rollout in Southern California Michael Nicholas, Joan Ogden Institute of Transportation Studies University of California, Davis November 16, 2009 Scope of study * Analyze "cluster" strategy for introducing H2 vehicles and refueling infrastructure in So. California over the next decade, to satisfy ZEV regulation. * Analyze: Station placement within the Los Angeles Basin Convenience of the refueling network (travel time to stations) Economics - capital and operating costs of stations; cost of H2 station build-out for different rollout scenarios. Transition costs for H2 to reach cost competitiveness with gasoline on cents/mile basis Options for meeting 33% renewable H2 requirement

469

Residential Windows and Window Coverings: A Detailed View of the Installed Base and User Behavior  

Broader source: Energy.gov [DOE]

Includes information about the installed base of residential windows and window coverings, and the operation of window coverings by households.

470

U.S. Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000  

Broader source: Energy.gov [DOE]

Report detailing the various codes and standards that are applicable for the installation, operation, and performance of microturbines.

471

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

472

Cost Study Manual | Department of Energy  

Energy Savers [EERE]

Cost Study Manual Cost Study Manual Update 62912. Memo regarding Cost Study Manual Cost Study Manual More Documents & Publications Policy Flash 2013-62 Acquisition Letter 09 -...

473

THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION  

E-Print Network [OSTI]

THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION JACK E. BAILEY' AND DALE R. EVANS' ABSTRACT A proposed hydroelectric installation in southeastern hydroelectric installation could result in temperatures as low as 4.5 0 C during spawning and initial incubation

474

Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1  

E-Print Network [OSTI]

Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1 Rob Gross 2 trenching operations for pipeline installation. Although mechanical soil excavation using heavy equipment are routinely installed, repaired, and replaced underground. During soil excavation, tree and other plant roots

Standiford, Richard B.

475

PIBASE.ligands installation guide. ver 200905 Fred P. Davis, HHMI-JFRC  

E-Print Network [OSTI]

SQL interface, a software package is also available that enables a web interface to the database. The database Web interface To install the web interface to the PIBASE.ligands database, you must first have a working PIBASE web server installed. Once you have the PIBASE web interface installed, download the PIBASE

Eddy, Sean

476

AN EXAMINATION OF BICYCLE COUNTS AND SPEEDS ASSOCIATED WITH THE INSTALLATION OF BIKE LANES  

E-Print Network [OSTI]

AN EXAMINATION OF BICYCLE COUNTS AND SPEEDS ASSOCIATED WITH THE INSTALLATION OF BIKE LANES IN ST An Examination of Bicycle Counts and Speeds Associated with the Installation of Bike Lanes in St. Petersburg It is assumed that installation of bicycle facilities will result in an increase in the number of bicyclists

North Carolina at Chapel Hill, University of

477

costs | OpenEI  

Open Energy Info (EERE)

7 7 Varnish cache server costs Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (11 months ago) Date Updated March 04th, 2013 (11 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

478

Retail Infrastructure Costs Comparison for Hydrogen and Electricity for Light-Duty Vehicles: Preprint  

SciTech Connect (OSTI)

Both hydrogen and plug-in electric vehicles offer significant social benefits to enhance energy security and reduce criteria and greenhouse gas emissions from the transportation sector. However, the rollout of electric vehicle supply equipment (EVSE) and hydrogen retail stations (HRS) requires substantial investments with high risks due to many uncertainties. We compare retail infrastructure costs on a common basis - cost per mile, assuming fueling service to 10% of all light-duty vehicles in a typical 1.5 million person city in 2025. Our analysis considers three HRS sizes, four distinct types of EVSE and two distinct EVSE scenarios. EVSE station costs, including equipment and installation, are assumed to be 15% less than today's costs. We find that levelized retail capital costs per mile are essentially indistinguishable given the uncertainty and variability around input assumptions. Total fuel costs per mile for battery electric vehicle (BEV) and plug-in hybrid vehicle (PHEV) are, respectively, 21% lower and 13% lower than that for hydrogen fuel cell electric vehicle (FCEV) under the home-dominant scenario. Including fuel economies and vehicle costs makes FCEVs and BEVs comparable in terms of costs per mile, and PHEVs are about 10% less than FCEVs and BEVs. To account for geographic variability in energy prices and hydrogen delivery costs, we use the Scenario Evaluation, Regionalization and Analysis (SERA) model and confirm the aforementioned estimate of cost per mile, nationally averaged, but see a 15% variability in regional costs of FCEVs and a 5% variability in regional costs for BEVs.

Melaina, M.; Sun, Y.; Bush, B.

2014-08-01T23:59:59.000Z

479

Advanced, Low-Cost Solar Water Heating Research Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

Advanced, Low-Cost Solar Water Heating Advanced, Low-Cost Solar Water Heating Research Project Advanced, Low-Cost Solar Water Heating Research Project The U.S. Department of Energy is currently conducting research into advanced low-cost solar water heating. This project will employ innovative techniques to adapt water heating technology to meet U.S. market requirements, including specifications, cost, and performance targets. Project Description This project seeks to identify and resolve technical, performance, and cost barriers to the development of easy-to-install and reliable solar water heating systems for all major U.S. climate regions. The project will also evaluate opportunities for breakthrough system innovations and innovations in advanced system performance ratings. Project Partners

480

DOE Pursues SunShot Initiative to Achieve Cost Competitive Solar Energy by  

Broader source: Energy.gov (indexed) [DOE]

Pursues SunShot Initiative to Achieve Cost Competitive Solar Pursues SunShot Initiative to Achieve Cost Competitive Solar Energy by 2020 DOE Pursues SunShot Initiative to Achieve Cost Competitive Solar Energy by 2020 February 4, 2011 - 12:00am Addthis Washington, D.C. - U.S. Energy Secretary Steven Chu today announced additional details of the Department of Energy's "SunShot" initiative to reduce the total costs of photovoltaic solar energy systems by about 75 percent so that they are cost competitive at large scale with other forms of energy without subsidies before the end of the decade. By reducing the cost for utility scale installations by about 75 percent to roughly $1 a watt - which would correspond to roughly 6 cents per kilowatt-hour - solar energy systems could be broadly deployed across the country.

Note: This page contains sample records for the topic "installed cost southern" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Optimal Location of Railroad Wayside Defect Detection Installations  

E-Print Network [OSTI]

Background, motivation and objective #12;5 5 Background New wayside detector technologies are used to monitor-gauge sensors on rails in reverse curves · Increase safety, reduce fuel costs, reduce damage to track Components Acoustic (e.g. TADSTM) Acoustic Bearing Detection Leaking Air Sensors Ultrasonic Cracked Wheel

Barkan, Christopher P.L.

482

Solar space heating installed at Kansas City, Kansas. Final report  

SciTech Connect (OSTI)

The solar energy system was constructed with the new 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while the auxiliary energy system heats the office area of about 9800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors, manufactured by Solaron Corporation, are double glazed flat plate collectors with a gross area of 7800 ft/sup 2/. Air is heated either through the collectors or by the electric resistance duct coils. No freeze protection or storage is required for this system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

Not Available

1981-05-01T23:59:59.000Z

483

Installation for a nuclear power station with staggered swimming pools  

SciTech Connect (OSTI)

In an installation for a nuclear power station comprising a ''reactor building'' with a first swimming pool for handling of fuel units and a fuel building with a second swimming pool for the transfer, storage and deactivation of the units, the second swimming pool is located at a lower level than that of the first and is connected to the first by an intermediate auxiliary chamber filled with water and located under the first swimming pool. The auxiliary chamber is connected by a vertical pipeline to the first swimming pool and by a horizontal connecting pipeline to the second swimming pool. Each of the pipelines is provided with a shut-off valve, with interlocking means which prevents the simultaneous opening of the two valves. There is negligible dead space around a conveyor basket for fuel units when it is in the vertical or horizontal pipelines.

Gigou, R.

1982-12-28T23:59:59.000Z

484

Retrofit SCADA installation combines SCADA and process control functions  

SciTech Connect (OSTI)

When Gulf States Utilities Company`s (now part of Entergy Operations, Inc.) River Bend Nuclear Plant, decided to add a closed cooling water system for the plant service water, a new SCADA system was required. Previously the normal service water system shared common cooling towers and flume with the plant`s circulating water system. Closing the system required a new cooling tower with pumps and heat exchangers to be constructed in a remote location. Existing equipment in the area was controlled via a multichannel tone SCADA system that did not have sufficient spare capacity for control of the new components. This paper will discuss how a new SCADA system was designed and installed, that also included process control. It will also address the operational experience to date.

Moffitt, T.O. [Entergy Operations, Inc., St. Francisville, LA (United States)

1995-09-01T23:59:59.000Z

485

Information handbook on independent spent fuel storage installations  

SciTech Connect (OSTI)

In this information handbook, the staff of the U.S. Nuclear Regulatory Commission describes (1) background information regarding the licensing and history of independent spent fuel storage installations (ISFSIs), (2) a discussion of the licensing process, (3) a description of all currently approved or certified models of dry cask storage systems (DCSSs), and (4) a description of sites currently storing spent fuel in an ISFSI. Storage of spent fuel at ISFSIs must be in accordance with the provisions of 10 CFR Part 72. The staff has provided this handbook for information purposes only. The accuracy of any information herein is not guaranteed. For verification or for more details, the reader should refer to the respective docket files for each DCSS and ISFSI site. The information in this handbook is current as of September 1, 1996.

Raddatz, M.G.; Waters, M.D.

1996-12-01T23:59:59.000Z

486

Microsoft Word - CX-Ashe-CGSFiberInstallation_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 5, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Debbie Ruckwardt Electrical Engineer - TEP-CSB-1 Proposed Action: Installing fiber optic cables between Bonneville Power Administration's (BPA) Ashe Substation and Energy Northwest's Columbia Generating Station (CGS). Budget Information: Work Order # 00261540 PP&A Project No.: PP&A 1864 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project takes place between BPA's Ashe Substation and Energy Northwest's

487

Fall 2012 FUPWG Meeting Welcome: Southern Company  

Broader source: Energy.gov [DOE]

Presentationgiven at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingcovers the Southern Company's retail service territory, financials, customers and sales, power generation, U.S. military projects, and more.

488

Configuration of a Southern Ocean Storm Track  

Science Journals Connector (OSTI)

Diagnostics of ocean variability that reflect and influence local transport properties of heat and chemical species vary by an order of magnitude along the Southern Oceans Antarctic Circumpolar Current (ACC). Topographic hotspots are important ...

Tobias Bischoff; Andrew F. Thompson

2014-12-01T23:59:59.000Z

489

California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors  

E-Print Network [OSTI]

1 California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors in the CSI-Thermal to the mixing valve. Place the hot sensor on the pipe between the solar tank and the backup water heater. #12

490

Can Solar PV Rebates Be Funded with Utility Cost Savings?  

Broader source: Energy.gov (indexed) [DOE]

Jan Aceti Jan Aceti Concord Light February 19, 2013 Concord Municipal Light Plant Photo Credit: K.M. Peterson  7,600 Customers ◦ 6,000 Residential ◦ 1,600 Commercial/Institutional/Governmental  Retail Sales: 180,000,000 kWh per Year  Peak Electrical Demand: 40 MW  Power Purchased from Facilities in Northeast Year # of Installations kW DC kW AC 1999 1 5 5 2008 3 4.2 4.0 2009 5 75.0 74.6 2010 3 158 151 2011 7 36 35 2012 19 143 137 2013 2 8.2 7.7 Total 40 429 414 Residential 35 178 170  $1,000 per kW AC, up to $5,000  Retail Net Metering  Replaced Retail Net Metering with Wholesale Net Metering ◦ Credit at Avg. Monthly Spot Market Energy Price  Rebate: 10 Years Worth of Estimated Cost Savings, Up to 5 kW AC of Installed Capacity  Transmission Cost Savings  Forward Capacity Market Cost Savings

491

Safety of Hydrogen Systems Installed in Outdoor Enclosures  

SciTech Connect (OSTI)

The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energys (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panels initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panels recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panels work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called cabinets, but for simplicity, they are all referred to as enclosures in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical basis be developed to enable code bodies to write requirements for the range of enclosures from the smallest to the largest.

Barilo, Nick F.

2013-11-06T23:59:59.000Z

492

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Broader source: Energy.gov (indexed) [DOE]

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

493

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Broader source: Energy.gov (indexed) [DOE]

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance

494

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Broader source: Energy.gov (indexed) [DOE]

Energy, Defense Partner to Install Fuel Cell Backup Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 11:46am Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

495

Departments of Energy, Defense Partner to Install Fuel Cell Backup Power  

Broader source: Energy.gov (indexed) [DOE]

Departments of Energy, Defense Partner to Install Fuel Cell Backup Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations July 19, 2011 - 4:56pm Addthis The U.S. Department of Energy (DOE) today announced that as part of an interagency partnership with the U.S. Department of Defense (DOD) to strengthen American energy security and develop new clean energy technologies, DOD will be installing and operating 18 fuel cell backup power systems at eight military installations across the country. The Departments will test how the fuel cells perform in real world operations, identify any technical improvements manufacturers could make to enhance performance, and highlight the benefits of fuel cells for emergency backup

496

Energy Cost Calculator for Commercial Heat Pumps (5.4 >=< 20 Tons) |  

Broader source: Energy.gov (indexed) [DOE]

Heat Pumps (5.4 >=< 20 Tons) Heat Pumps (5.4 >=< 20 Tons) Energy Cost Calculator for Commercial Heat Pumps (5.4 >=< 20 Tons) October 8, 2013 - 2:22pm Addthis Vary equipment size, energy cost, hours of operation, and /or efficiency level. INPUT SECTION Input the following data (if any parameter is missing, calculator will set to default value). Defaults Project Type New Installation Replacement New Installation Condenser Type Air Source Water Source Air Source Existing Capacity * ton - Existing Cooling Efficiency * EER - Existing Heating Efficiency * COP - Existing IPLV Efficiency * IPLV - New Capacity ton 10 tons New Cooling Efficiency EER 10.1 EER New Heating Efficiency COP 3.2 COP New IPLV Efficiency IPLV 10.4 IPLV Energy Cost $ per kWh $0.06 per kWh

497

The impact of electric vehicles on the Southern California Edison System. Final report  

SciTech Connect (OSTI)

This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the ``Air Quality Impacts of Energy Efficiency`` Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers` view has been studied with special emphasis on the role of marketable permit systems. The utilities` view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility`s average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

Ford, A.

1992-07-01T23:59:59.000Z

498

The impact of electric vehicles on the Southern California Edison System  

SciTech Connect (OSTI)

This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the Air Quality Impacts of Energy Efficiency'' Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers' view has been studied with special emphasis on the role of marketable permit systems. The utilities' view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility's average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

Ford, A.

1992-07-01T23:59:59.000Z

499

Abstract--Layout of the conductor material in the dc bus of a photovoltaic (PV) array to lower first cost and ohmic losses is  

E-Print Network [OSTI]

its operating economy by reducing installed cost and ohmic losses. Index Terms--Photovoltaic systemsAbstract--Layout of the conductor material in the dc bus of a photovoltaic (PV) array to lower first cost and ohmic losses is reviewed. Six PV materials are characterized for their voltage swings

King, Roger

500

One-Axis Trackers -- Improved Reliability, Durability, Performance, and Cost Reduction; Final Subcontract Technical Status Report, 2 May 2006 - 31 August 2007  

SciTech Connect (OSTI)

The overall objective of this subcontract is to reduce the total cost of electricity generated by single-axis tracking solar energy systems for utility and other large-scale commercial applications by improving performance and reliability and by reducing installation time, cost, and environmental impact.

Shingleton, J.

2008-02-01T23:59:59.000Z